National Library of Energy BETA

Sample records for tory commission nrc

  1. From 1998 to 2000, through the Interagency Steering Committee on Radiation Standards (ISCORS), the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental

    E-Print Network [OSTI]

    Standards (ISCORS), the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental Protection

  2. NRC (Nuclear Regulatory Commission) staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    SciTech Connect (OSTI)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved.

  3. NRC Recommendations

    Broader source: Energy.gov [DOE]

    Presentation on NRC recommendations to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004 to discuss and define role of systems analysis in DOE Hydrogen Program.

  4. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1986-11-30

    Functional organization charts for the NRC Commission Offices, Divisions, and Branches are presented.

  5. NRC antitrust licensing actions, 1978--1996

    SciTech Connect (OSTI)

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

  6. TORIS Data Preparation Guidelines

    SciTech Connect (OSTI)

    Guinn, H.; Remson, D.

    1999-03-11

    The objective of this manual is to present guidelines and procedures for the preparation of new data for the Tertiary Oil Recovery Information System (TORIS) data base. TORIS is an analytical system currently maintained by the Department of Energy's (DOE) Bartlesville Project Office. It uses an extensive field- and reservoir-level data base to evaluate the technical and economic recovery potential of specific crude oil reservoirs.

  7. Nuclear Regulatory Commission Proceedings: A Guide for Intervenors

    E-Print Network [OSTI]

    Hansell, Dean

    1982-01-01

    Nuclear Regulatory Commission Proceedings: A Guide Forto both the Nuclear Regulatory Commission and the Atomicpower, Nuclear Regulatory Commission (NRC or Commission)

  8. Commission.

    National Nuclear Security Administration (NNSA)

    and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) Annual Users...

  9. AVAILABILITY OF REFERENCE MATERIALS NRC Reference Material

    E-Print Network [OSTI]

    Services Section U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: DISTRIBUTION, Division of Administrative Services, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001. ised; licensee event reports; and Commission papers and their attachments. NRC publications in the NUREG series

  10. Deformed Noncommutative Tori

    E-Print Network [OSTI]

    Joakim Arnlind; Harald Grosse

    2012-01-13

    We recall a construction of non-commutative algebras related to a one-parameter family of (deformed) spheres and tori, and show that in the case of tori, the *-algebras can be completed into C*-algebras isomorphic to the standard non-commutative torus. As the former was constructed in the context of matrix (or fuzzy) geometries, it provides an important link to the framework of non-commutative geometry, and opens up for a concrete way to study deformations of non-commutative tori. Furthermore, we show how the well-known fuzzy sphere and fuzzy torus can be obtained as formal scaling limits of finite-dimensional representations of the deformed algebras, and their projective modules are described together with connections of constant curvature.

  11. Operating Experience Level 3, NRC Notice: Antifreeze Agents in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (OE-3) document provides information about safety concerns identified by the Nuclear Regulatory Commission (NRC) that could potentially apply to work performed at Department of...

  12. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    Functional organization charts for the NRC Commission Offices, Divisions, Staffs and Branches are presented.

  13. Romero Tori Claudio Kirner

    E-Print Network [OSTI]

    Barbosa, Alberto

    #12;Romero Tori Claudio Kirner Robson Siscoutto Editores Fundamentos e Tecnologia de Realidade tecnologia de RV e RA e suas aplicações. Somos uma comunidade jovem, multidisciplinar, criativa, aberta oferecer um curso rápido e abrangente sobre os principais conceitos e tecnologias das áreas de RV e RA, de

  14. DOE Petitions for NRC Review in Yucca Mountain Proceeding

    Broader source: Energy.gov [DOE]

    The United States Department of Energy today filed with the Nuclear Regulatory Commission a petition requesting that the Commission review and reverse an order by the NRCs Atomic Safety and...

  15. NRC - regulator of nuclear safety

    SciTech Connect (OSTI)

    1997-05-01

    The U.S. Nuclear Regulatory Commission (NRC) was formed in 1975 to regulate the various commercial and institutional uses of nuclear energy, including nuclear power plants. The agency succeeded the Atomic Energy Commission, which previously had responsibility for both developing and regulating nuclear activities. Federal research and development work for all energy sources, as well as nuclear weapons production, is now conducted by the U.S. Department of Energy. Under its responsibility to protect public health and safety, the NRC has three principal regulatory functions: (1) establish standards and regulations, (2) issue licenses for nuclear facilities and users of nuclear materials, and (3) inspect facilities and users of nuclear materials to ensure compliance with the requirements. These regulatory functions relate to both nuclear power plants and to other uses of nuclear materials - like nuclear medicine programs at hospitals, academic activities at educational institutions, research work, and such industrial applications as gauges and testing equipment. The NRC places a high priority on keeping the public informed of its work. The agency recognizes the interest of citizens in what it does through such activities as maintaining public document rooms across the country and holding public hearings, public meetings in local areas, and discussions with individuals and organizations.

  16. 1996 NRC annual report. Volume 13

    SciTech Connect (OSTI)

    1997-10-01

    This 22nd annual report of the US Nuclear Regulatory Commission (NRC) describes accomplishments, activities, and plans made during Fiscal Year 1996 (FH 1996)--October 1, 1995, through September 30, 1996. Significant activities that occurred early in FY 1997 are also described, particularly changes in the Commission and organization of the NRC. The mission of the NRC is to ensure that civilian uses of nuclear materials in the US are carried out with adequate protection of public health and safety, the environment, and national security. These uses include the operation of nuclear power plants and fuel cycle plants and medical, industrial, and research applications. Additionally, the NRC contributes to combating the proliferation of nuclear weapons material worldwide. The NRC licenses and regulates commercial nuclear reactor operations and research reactors and other activities involving the possession and use of nuclear materials and wastes. It also protects nuclear materials used in operation and facilities from theft or sabotage. To accomplish its statutorily mandated regulatory mission, the NRC issues rules and standards, inspects facilities and operations, and issues any required enforcement actions.

  17. Turbulent AGN tori

    E-Print Network [OSTI]

    M. Schartmann; K. Meisenheimer; H. Klahr; M. Camenzind; S. Wolf; Th. Henning

    2008-08-05

    Recently, the MID-infrared Interferometric instrument (MIDI) at the VLTI has shown that dust tori in the two nearby Seyfert galaxies NGC 1068 and the Circinus galaxy are geometrically thick and can be well described by a thin, warm central disk, surrounded by a colder and fluffy torus component. By carrying out hydrodynamical simulations with the help of the TRAMP code (Klahr et al. 1999), we follow the evolution of a young nuclear star cluster in terms of discrete mass-loss and energy injection from stellar processes. This naturally leads to a filamentary large scale torus component, where cold gas is able to flow radially inwards. The filaments open out into a dense and very turbulent disk structure. In a post-processing step, we calculate observable quantities like spectral energy distributions or images with the help of the 3D radiative transfer code MC3D (Wolf 2003). Good agreement is found in comparisons with data due to the existence of almost dust-free lines of sight through the large scale component and the large column densities caused by the dense disk.

  18. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  19. Status of the NRC Decommissioning Program

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

  20. STATUS OF THE NRC'S DECOMMISSIONING PROGRAM

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L. W.; Buckley, J.

    2002-02-25

    On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

  1. NRC Regulatory Agenda quarterly report, July--September 1993. Volume 12, No. 3

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  2. Polygonal billiards and "optical tori"

    E-Print Network [OSTI]

    Eduardo Daz-Miguel

    2015-07-16

    We give an optical physicist view of the problem of the trajectories in a polygonal billiard using only basic facts of Optics and the theory of functions of a complex variable. This approach allow us to stablish a certain correspondence between n-gon billiards and one-holed 2n-punctured tori. Therefore the existence of periodic trajectories in a certain polygon becomes the problem of the existence of closed geodesics in its associated torus.

  3. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  4. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  5. Quasi-periodic oscillations of perturbed tori

    E-Print Network [OSTI]

    Parthasarathy, Varadarajan; Kluzniak, Wlodek

    2015-01-01

    We performed axisymmetric hydrodynamic simulations of perturbed tori orbiting a black hole. The tori in equilibrium were constructed with a constant distribution of angular momentum in a pseudo-Newtonian potential (Klu{\\'z}niak-Lee). Epicyclic motions were triggered by adding sub-sonic velocity fields: radial, vertical and diagonal to the tori in equilibrium. As the perturbed tori evolved in time, we measured $L_{2}$ norm of density and obtained the power spectrum of $L_{2}$ norm which manifested eigenfrequencies of tori modes. We observe a pair of modes which occur in an approximate 3:2 ratio. Results from our simulations are relevant in the context of high-frequency quasi-periodic oscillations (HF QPOs) observed in stellar-mass black hole binaries.

  6. General statement of policy and procedures for NRC enforcement actions: Enforcement policy. Revision 1

    SciTech Connect (OSTI)

    1998-05-01

    This document includes the US Nuclear Regulatory Commission`s (NRC`s or Commission`s) revised General Statement of Policy and Procedure for Enforcement Actions (Enforcement Policy) as it was published in the Federal Register on May 13, 1998 (63 ER 26630). The Enforcement Policy is a general statement of policy explaining the NRC`s policies and procedures in initiating enforcement actions, and of the presiding officers and the Commission in reviewing these actions. This policy statement is applicable to enforcement matters involving the radiological health and safety of the public, including employees` health and safety, the common defense and security, and the environment.

  7. Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

    SciTech Connect (OSTI)

    Walker, Stuart

    2008-01-15

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions that NRC should consider that address the site-specific matter that triggered consultation. Over the course of consultations on the eight sites, there have been some reoccurring themes to EPA's views. Primarily, these are EPA: 1. Recommending that NRC consider selecting institutional controls to ensure that NRC's assumptions about future human exposure at the site are not exceeded. 2. Recommending that NRC consider using more site-specific information when conducting dose assessment modeling. 3. Recommending that NRC consider a flexible approach to groundwater protection that still ensures the public is not exposed to contamination levels over drinking water limits. 4. Recommending that NRC consider an approach similar to how EPA implements supplemental standards under 40 CFR 192 as an ARAR when the UMTRCA soil standard of 5 pCi/g is not being met.

  8. BPS states on noncommutative tori and duality

    E-Print Network [OSTI]

    Anatoly Konechny; Albert Schwarz

    1998-12-10

    We study gauge theories on noncommutative tori. It was proved in [5] that Morita equivalence of noncommutative tori leads to a physical equivalence (SO(d,d| Z)-duality) of the corresponding gauge theories. We calculate the energy spectrum of maximally supersymmetric BPS states in these theories and show that this spectrum agrees with the SO(d,d| Z)-duality. The relation of our results with those of recent calculations is discussed.

  9. NRC Leadership Expectations and Practices for Sustaining a High...

    Broader source: Energy.gov (indexed) [DOE]

    NRC Mission Safety Culture NRC Oversight NRC Inspection Program Technical Qualification Continuous Learning NRC Leadership Expectations and Practices for Sustaining a High...

  10. Congress, NRC mull utility access to FBI criminal files

    SciTech Connect (OSTI)

    Ultroska, D.

    1984-08-01

    Experiences at Alabama Power Company and other nuclear utilities have promped a request for institutionalizing security checks of personnel in order to eliminated convicted criminals and drug users. The Nuclear Regulatory Commission (NRC), which could provide FBI criminal history information by submitting fingerprints, does not do so, and would require new legislation to take on that duty. Believing that current malevolent employees can be managed with existing procedures, NRC allows criminal background checks only on prospective employees in order to avoid a negative social impact on personnel. Legislation to transfer criminal histories to nuclear facilities is now pending, and NRC is leaning toward a request for full disclosure, partly because of terrorist threats and partly to save manpower time and costs in reviewing case histories.

  11. Theta-functions on noncommutative tori

    E-Print Network [OSTI]

    Albert Schwarz

    2001-07-25

    Ordinary theta-functions can be considered as holomorphic sections of line bundles over tori. We show that one can define generalized theta-functions as holomorphic elements of projective modules over noncommutative tori (theta-vectors). The theory of these new objects is not only more general, but also much simpler than the theory of ordinary theta-functions. It seems that the theory of theta-vectors should be closely related to Manin's theory of quantized theta-functions, but we don't analyze this relation.

  12. Enhancement of NRC station blackout requirements for nuclear power plants

    SciTech Connect (OSTI)

    McConnell, M. W.

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to enhance core and spent fuel pool cooling, reactor coolant system integrity, and containment integrity. (authors)

  13. NRC Construction Light Source Flicker: What We

    E-Print Network [OSTI]

    California at Davis, University of

    NRC Construction Light Source Flicker: What We Need to Know, and Why You Should Care NRC Construction Jennifer A. Veitch, Ph.D. (c) 2013, National Research Council Canada #12;NRC Construction Handbook: Reference & Application (9th Ed.), 2000, p. 3-20 #12;NRC Construction Flicker Effects 1

  14. NRC policy on future reactor designs

    SciTech Connect (OSTI)

    none,

    1985-07-01

    On April 13, 1983, the US Nuclear Regulatory Commission issued for public comment a ''Proposed Commission Policy Statement on Severe Accidents and Related Views on Nuclear Reactor Regulation'' (48 FR 16014). This report presents and discusses the Commission's final version of that policy statement now entitled, ''Policy Statement on Severe Reactor Accidents Regarding Future Designs and Existing Plants.'' It provides an overview of comments received from the public and the Advisory Committee on Reactor Safeguards and the staff response to these. In addition to the Policy Statement, the report discusses how the policies of this statement relate to other NRC programs including the Severe Accident Research Program; the implementation of safety measures resulting from lessons learned in the accident at Three Mile Island; safety goal development; the resolution of Unresolved Safety Issues and other Generic Safety Issues; and possible revisions of rules or regulatory requirements resulting from the Severe Accident Source Term Program. Also discussed are the main features of a generic decision strategy for resolving Regulatory Questions and Technical Issues relating to severe accidents; the development and regulatory use of new safety information; the treatment of uncertainty in severe accident decision making; and the development and implementation of a Systems Reliability Program for both existing and future plants to ensure that the realized level of safety is commensurate with the safety analyses used in regulatory decisions.

  15. UPDATING THE NRC GUIDANCE FOR HUMAN FACTORS ENGINEERING REVIEWS.

    SciTech Connect (OSTI)

    O HARA,J.M.; BROWN,W.S.; HIGGINS,J.C.; PERSENSKY,J.J.; LEWIS,P.M.; BONGARRA,J.

    2002-09-15

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) aspects of nuclear plants. NUREG-0800 (Standard Review Plan), Chapter 18, ''Human Factors Engineering,'' is the principal NRC staff guidance document. Two main documents provide the review criteria to support the evaluations. The HFE Program Review Model (NUREG-0711) addresses the design process from planning to verification and validation to design implementation. The Human-System Interface Design Review Guidelines (NUREG-0700) provides the guidelines for the review of the HFE aspects of human-system interface technology, such as alarms, information systems, controls, and control room design. Since these documents were published in 1994 and 1996 respectively, they have been used by NRC staff, contractors, nuclear industry organizations, as well as by numerous organizations outside the nuclear industry. Using feedback from users and NRC research conducted in recent years, both documents have been revised and updated. This was done to ensure that they remain state-of-the-art evaluation tools for changing nuclear industry issues and emerging technologies. This paper describes the methodology used to revise and update the documents and summarizes the changes made to each and their current contents. Index Terms for this report are: Control system human factors, Ergonomics, Human factors, Nuclear power generation safety.

  16. DOE Awards Contract for the Nuclear Regulatory Commission (NRC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center (INTEC) in Idaho; and management of the Idaho Spent Fuel Facility (ISFF) license. This is a hybrid type contract with Firm-Fixed-Price (FFP), Indefinite Delivery...

  17. DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electric vehicle10 DOE ASSESSMENTathasBestI) AprilSupport Services

  18. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect (OSTI)

    Olive, K [ed.] [ed.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  19. Recommendations for NEAMS Engagement with the NRC: Preliminary Report

    SciTech Connect (OSTI)

    Bernholdt, David E

    2012-06-01

    The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

  20. REVIEW OF NRC APPROVED DIGITAL CONTROL SYSTEMS ANALYSIS

    SciTech Connect (OSTI)

    D.W. Markman

    1999-09-17

    Preliminary design concepts for the proposed Subsurface Repository at Yucca Mountain indicate extensive reliance on modern, computer-based, digital control technologies. The purpose of this analysis is to investigate the degree to which the U. S. Nuclear Regulatory Commission (NRC) has accepted and approved the use of digital control technology for safety-related applications within the nuclear power industry. This analysis reviews cases of existing digitally-based control systems that have been approved by the NRC. These cases can serve as precedence for using similar types of digitally-based control technologies within the Subsurface Repository. While it is anticipated that the Yucca Mountain Project (YMP) will not contain control systems as complex as those required for a nuclear power plant, the review of these existing NRC approved applications will provide the YMP with valuable insight into the NRCs review process and design expectations for safety-related digital control systems. According to the YMP Compliance Program Guidance, portions of various NUREGS, Regulatory Guidelines, and nuclear IEEE standards the nuclear power plant safety related concept would be applied to some of the designs on a case-by-case basis. This analysis will consider key design methods, capabilities, successes, and important limitations or problems of selected control systems that have been approved for use in the Nuclear Power industry. An additional purpose of this analysis is to provide background information in support of further development of design criteria for the YMP. The scope and primary objectives of this analysis are to: (1) Identify and research the extent and precedence of digital control and remotely operated systems approved by the NRC for the nuclear power industry. Help provide a basis for using and relying on digital technologies for nuclear related safety critical applications. (2) Identify the basic control architecture and methods of key digital control systems approved for use in the nuclear power industry by the NRC. (3) Identify and discuss key design issues, features, benefits, and limitations of these NRC approved digital control systems that can be applied as design guidance and correlated to the Monitored Geologic Repository (MGR) design requirements. (4) Identify codes and standards used in the design of these NRC approved digital control systems and discuss their possible applicability to the design of a subsurface nuclear waste repository. (5) Evaluate the NRC approved digital control system's safety, reliability and maintainability features and issues. Apply these to MGR design methodologies and requirements. (6) Provide recommendations for use in developing design criteria in the System Description Documents for the digital control systems of the subsurface nuclear waste repository at Yucca Mountain. (7) Develop recommendations for applying NRC approval methods for digital control systems for the subsurface nuclear waste repository at Yucca Mountain. This analysis will focus on the development of the issues, criteria and methods used and required for identifying the appropriate requirements for digital based control systems. Attention will be placed on development of recommended design criteria for digital controls including interpretation of codes, standards and regulations. Attention will also focus on the use of digital controls and COTS (Commercial Off-the-shelf) technology and equipment in selected NRC approved digital control systems, and as referenced in applicable codes, standards and regulations. The analysis will address design issues related to COTS technology and how they were dealt with in previous NRC approved digital control systems.

  1. Jets and Tori in Proto-Planetary Nebulae

    E-Print Network [OSTI]

    P. J. Huggins

    2007-03-21

    We investigate the time sequence for the appearance of jets and molecular tori in the transition of stars from the Asymptotic Giant Branch to the planetary nebula phase. Jets and tori are prominent features of this evolution, but their origins are uncertain. Using optical and millimeter line kinematics, we determine the ejection history in a sample of well-observed cases. We find that jets and tori develop nearly simultaneously. We also find evidence that jets typically appear slightly later than tori, with a lag time of a few hundred years. These characteristics provide strong evidence that jets and tori are physically related, and they set new constraints on theories of jet formation. The ejection of a discrete torus followed by jets on a short time scale favors the class of models in which a companion interacts with the central star. Models with long time scales, or with jets followed by a torus, are ruled out.

  2. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    NONE

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  3. Government perspective. [FY 1994 budgets for DOE and NRC

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    During April, several Congressional committees held hearings on the FY 1994 budget submitted by the Department of Energy (DOE). DOE has requested a total nuclear energy budget of $165 million, reduced from $299.3 million in FY 1993. Energy Secretary Hazel O'Leary and acting Assistant Secretary for Nuclear Energy, Mr. E.C. Brolin, testified that DOE intends to continue to fund research for light water reactors (LWR) at a level of $57.8 million during FY 1994, a slight decline from the $58.7 million requested for FY 1993. The LWR program funding will allow work to continue on the standardization and design certification programs. However, DOE's proposed $45 million budget cut, to only $15 million, for funding of advanced nuclear research and development programs has been sharply criticized by nuclear industry supporters in Congress. The Nuclear Regulatory Commission's (NRC) Chairman, Ivan Selin, testified before the House Energy and Water Appropriations Subcommittee regarding NRC's budget request. NRC is requesting $547.7 million for FY 1994, an increase of 1.5 percent over the FY 1993 budget.

  4. Three-dimensional tori and Arnold tongues

    SciTech Connect (OSTI)

    Sekikawa, Munehisa, E-mail: sekikawa@cc.utsunomiya-u.ac.jp [Department of Mechanical and Intelligent Engineering, Utsunomiya University, Utsunomiya-shi 321-8585 (Japan)] [Department of Mechanical and Intelligent Engineering, Utsunomiya University, Utsunomiya-shi 321-8585 (Japan); Inaba, Naohiko [Organization for the Strategic Coordination of Research and Intellectual Property, Meiji University, Kawasaki-shi 214-8571 (Japan)] [Organization for the Strategic Coordination of Research and Intellectual Property, Meiji University, Kawasaki-shi 214-8571 (Japan); Kamiyama, Kyohei [Department of Electronics and Bioinformatics, Meiji University, Kawasaki-shi 214-8571 (Japan)] [Department of Electronics and Bioinformatics, Meiji University, Kawasaki-shi 214-8571 (Japan); Aihara, Kazuyuki [Institute of Industrial Science, the University of Tokyo, Meguro-ku 153-8505 (Japan)] [Institute of Industrial Science, the University of Tokyo, Meguro-ku 153-8505 (Japan)

    2014-03-15

    This study analyzes an Arnold resonance web, which includes complicated quasi-periodic bifurcations, by conducting a Lyapunov analysis for a coupled delayed logistic map. The map can exhibit a two-dimensional invariant torus (IT), which corresponds to a three-dimensional torus in vector fields. Numerous one-dimensional invariant closed curves (ICCs), which correspond to two-dimensional tori in vector fields, exist in a very complicated but reasonable manner inside an IT-generating region. Periodic solutions emerge at the intersections of two different thin ICC-generating regions, which we call ICC-Arnold tongues, because all three independent-frequency components of the IT become rational at the intersections. Additionally, we observe a significant bifurcation structure where conventional Arnold tongues transit to ICC-Arnold tongues through a Neimark-Sacker bifurcation in the neighborhood of a quasi-periodic Hopf bifurcation (or a quasi-periodic Neimark-Sacker bifurcation) boundary.

  5. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect (OSTI)

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  6. HFE Process Guidance and Standards for potential application to updating NRC guidance

    SciTech Connect (OSTI)

    Jacques Hugo; J. J. Persensky

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staffs HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

  7. New security measures are proposed for N-plants: Insider Rule package is issued by NRC

    SciTech Connect (OSTI)

    Not Available

    1984-09-01

    New rules proposed by the Nuclear Regulatory Commission (NRC) will require background investigations and psychological assessments of new job candidates and continual monitoring of the behavior of all power plant workers with access to sensitive areas. Licensees will have to submit an ''access authorization'' program for approval describing how they will conduct these security activities. The employee checks will go back five years to examine credit, educational, and criminal histories. Implementation of the rules could involve the Edison Electric Institute as an intermediary to funnel criminal checks from the Justice Department and FBI. The NRC is also considering a clarification of areas designated as ''vital'' because current designations may be too strict.

  8. NRC TLD direct radiation monitoring network: Progress report, July--September 1997. Volume 17, Number 3

    SciTech Connect (OSTI)

    Struckmeyer, R.

    1998-01-01

    The US Nuclear Regulatory Commission (NRC) Direct Radiation Monitoring Network is operated by the NRC in cooperation with participating states to provide continuous measurement of the ambient radiation levels around licensed NRC facilities, primarily power reactors. Ambient radiation levels result from naturally occurring radionuclides present in the soil, cosmic radiation constantly bombarding the earth from outer space, and the contribution, if any, from the monitored facilities and other man-made sources. The Network is intended to measure radiation levels during routine facility operations and to establish background radiation levels used to assess the radiological impact of an unusual condition, such as an accident. This report presents the radiation levels measured around all facilities in the Network for the third quarter of 1996. A complete listing of the site facilities monitored is included. In some instances, two power reactor facilities are monitored by the same set of dosimeters (e.g., Kewaunee and Point Beach).

  9. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  10. Commissioner George Apostolakis U.S. Nuclear Regulatory Commission

    E-Print Network [OSTI]

    Bernstein, Joseph B.

    Commissioner George Apostolakis U.S. Nuclear Regulatory Commission CmrApostolakis@nrc.gov 25th event occurs at a nuclear facility." [Commission's White Paper, February, 1999] Questions that defense associated with current regulatory requirements 8 #12;Risk-Informed Framework 9 Traditional "Deterministic

  11. Peer Review of NRC Standardized Plant Analysis Risk Models

    SciTech Connect (OSTI)

    Anthony Koonce; James Knudsen; Robert Buell

    2011-03-01

    The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

  12. Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402

    SciTech Connect (OSTI)

    Chakraborti, Sayan; Stone, Lynn; Hyatt, Jeannette

    2013-07-01

    Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the Environmental Report is being evaluated at the Savannah River Site as a case study for application across the DOE Complex. This paper will present areas of direct correlation as well as those where the need for site specific data for either DOE operations or NRC compliance warrant additional interaction between the agencies. Areas where further refinement of the SMR technologies may drive collaborative development of revised regulations through such means as industry consensus standards will also be highlighted. Both NRC and DOE have requirements that mandate public involvement in their processes. The importance and value of early engagement with the public as well as collaborating regulatory agencies is of critical importance when deploying new technologies. (authors)

  13. UPDATING THE NRC STANDARD REVIEW PLAN - CHAPTER 8 - ELECTRICAL SYSTEMS

    SciTech Connect (OSTI)

    SULLIVAN,K.

    2007-06-24

    The Standard Review Plan (SRP) (Reference 2), provides guidance to the regulatory staff of the Nuclear Regulatory Commission (NRC) on performing their safety reviews of applications to construct or operate nuclear power plants, and applications to approve standard designs and sites for nuclear power plants. Chapter 8 of the SRP provides guidance related to the review of station electrical distribution systems described by the applicant in its Design Control Document (DCD) or Safety Analysis Report (SAR). As part of the 2006-2007 SAR update, all sections in this Chapter (8.1, 8.2, 8.3.1, 8.3.2, Appendix 8A, and Appendix 8B) were revised to incorporate new analyses, design approaches, and the lessons learned from the review of the AP 1000 design certification and to assure consistency with the draft Regulatory Guide DG-1145, ''Combined License Applications for Nuclear Power Plants (LWR Edition)''.

  14. The impact of NRC guidance on concentration averaging on low level waste sealed source disposal - 11424

    SciTech Connect (OSTI)

    Whitworth, Julia [Los Alamos National Laboratory; Stewart, Bill [Los Alamos National Laboratory; Cuthbertson, Abigail [DOE

    2011-01-20

    As part of its ongoing efforts to revise the Nuclear Regulatory Commission's (NRC) current position on blending to be risk-informed and performance based and its current review of the low-level waste classification codified in 10 CFR 61.55, the Nuclear Regulatory Commission (NRC) has stated that it may review the 1995 'Branch Technical Position on Concentration Averaging and Encapsulation' (BTP), which is still commonly used today. Such a review will have timely advantages, given the lack of commercial disposal availability within the United States for radioactive sealed sources that are in wide beneficial use across the country. The current application of the BTP guidance has resulted in an effective cap on commercial disposal for sources larger than 1.1 TBq (30 Ci). This paper will analyze how the BTP has been implemented with respect to sealed sources, what the implications have been for commercial disposal availability, and whether alternative packaging configurations could be considered for disposal.

  15. Technical Basis for Physical Fidelity of NRC Control Room Training Simulators for Advanced Reactors

    SciTech Connect (OSTI)

    Minsk, Brian S.; Branch, Kristi M.; Bates, Edward K.; Mitchell, Mark R.; Gore, Bryan F.; Faris, Drury K.

    2009-10-09

    The objective of this study is to determine how simulator physical fidelity influences the effectiveness of training the regulatory personnel responsible for examination and oversight of operating personnel and inspection of technical systems at nuclear power reactors. It seeks to contribute to the U.S. Nuclear Regulatory Commissions (NRCs) understanding of the physical fidelity requirements of training simulators. The goal of the study is to provide an analytic framework, data, and analyses that inform NRC decisions about the physical fidelity requirements of the simulators it will need to train its staff for assignment at advanced reactors. These staff are expected to come from increasingly diverse educational and experiential backgrounds.

  16. Commissioning Process

    Broader source: Energy.gov [DOE]

    The commissioning process for Federal facilities generally follows a four-step process. This process holds true across all forms of commissioning and for both new and existing buildings.

  17. Quantum Chaos for point scatterers on flat tori

    E-Print Network [OSTI]

    Henrik Ueberschaer

    2013-04-23

    This survey article deals with a delta potential - also known as a point scatterer - on flat 2D and 3D tori. We introduce the main conjectures regarding the spectral and wave function statistics of this model in the so- called weak and strong coupling regimes. We report on recent progress as well as a number of open problems in this field.

  18. 1/4-BPS states on noncommutative tori

    E-Print Network [OSTI]

    A. Konechny; A. Schwarz

    1999-08-06

    We give an explicit expression for classical 1/4-BPS fields in supersymmetric Yang-Mills theory on noncommutative tori. We use it to study quantum 1/4-BPS states. In particular we calculate the degeneracy of 1/4-BPS energy levels.

  19. NRC comprehensive records disposition schedule. Revision 3

    SciTech Connect (OSTI)

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  20. Microsoft PowerPoint - 5_Pat Smith_NMMSS_2013_Presentation_NRC...

    National Nuclear Security Administration (NNSA)

    Reconciliation Pat Smith PSI NRC Lead NRC Reconciliation NRC Reconciliation requirements per NUREGBR-0007, Rev. 6 All RIS's must submit an MSR (Material Summary Report)...

  1. Nuclear safety information sharing agreement between NRC and...

    Office of Environmental Management (EM)

    for DOE and NRC to exchange information related to safety issues associated with non-reactor nuclear facilities. The NRC-DOE Inter-Agency nuclear safety information sharing...

  2. DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON,...

  3. NRC regulatory agenda: Semiannual report, January--June 1995. Volume 14, Number 1

    SciTech Connect (OSTI)

    1995-09-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition. The agenda consists of two sections that have been updated through June 30, 1995. Section 1, ``Rules,`` includes (A) rules on which final action has been taken since December 30, 1994, the closing date of the last NRC Regulatory Agenda; (B) rules published previously as proposed rules on which the Commission has not taken final action; (C) rules published as advance notices of proposed rulemaking for which neither a proposed nor final rule has been issued; and (D) unpublished rules on which the NRC expects to take action. Section 2, ``Petitions for Rulemaking,`` includes (A) petitions denied or incorporated into final rules since December 30, 1994; (B) petitions incorporated into proposed rules; (C) petitions pending staff review, and (D) petitions with deferred action.

  4. 4th Annual NRC Small Business Seminar and Matchmaking Event

    Broader source: Energy.gov [DOE]

    The U.S. NRC regulates commercial and institutional uses of nuclear energy to protect the public health and safety, promote the common defense and security, and protect the environment. Attendees will hear directly from NRC leadership on the vision and priorities of the NRC at its Headquarters in Rockville, Maryland, including current acquisition initiatives and how small businesses can support their mission.

  5. NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398

    SciTech Connect (OSTI)

    McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.; Mohseni, Aby

    2013-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities in the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely NRC's role will change from doing both consultation and monitoring to being focused on monitoring activities within NDAA. DOE has identified other activities at the Hanford Nuclear Reservation that would continue consultation activities but outside of the NDAA in the future. During the past seven years of consultations and monitoring a number of lessons learned about the process, communication issues, and technical guidance have been identified. With the change in focus from reviewing initial performance assessments and draft waste determinations to long-term monitoring (e.g., individual waste tank closure, at F Tank Farm or complete tank farm closure at INTEC expected in the near future), the NRC is going to revise and update its guidance over the next few years to reflect the lessons learned and the change in focus. In addition to the lessons learned, improvements in the guidance will have to account possible rule and guidance changes underway within Part 61. This paper will discuss the initial plans, approaches, and time lines to revise the guidance within NUREG-1854, including opportunities for public involvement. (authors)

  6. Perfect fluid tori orbiting Kehagias-Sfetsos naked singularities

    E-Print Network [OSTI]

    Stuchlk, Zden?k; Schee, Jan; Ku?kov, Hana

    2014-01-01

    We construct perfect fluid tori in the field of the Kehagias-Sfetsos (K-S) naked singularity representing spherically symmetric vacuum solution of the modified Ho\\v{r}ava quantum gravity that is characterized by a dimensionless parameter $\\omega M^2$, combining the gravitational mass parameter $M$ of the spacetime with the Ho\\v{r}ava parameter $\\omega$ reflecting the role of the quantum corrections. In dependence on the value of $\\omega M^2$, the K-S naked singularities demonstrate a variety of qualitatively different behavior of their circular geodesics that is fully reflected in the properties of the toroidal structures. In all of the K-S naked singularity spacetimes the tori are located above an "antigravity" sphere where matter can stay in stable equilibrium position, that is relevant for the stability of the orbiting fluid toroidal accretion structures.

  7. Jets and Tori in Proto-Planetary Nebulae: Observations vs. Theory

    E-Print Network [OSTI]

    P. J. Huggins

    2007-09-21

    We report on a study of the time sequence for the appearance of high-velocity jets and equatorial tori in the transition of stars from the asymptotic giant branch to the planetary nebulae phase. Jets and tori are prominent features of this evolution, but their origins are uncertain. Using the kinematics of molecular tori and molecular or optical jets, we determine the ejection histories for a sample of well-observed cases. We find that jets and tori develop nearly simultaneously. We also find evidence that jets appear slightly later than tori, with a typical jet-lag of a few hundred years. The reconstructed time-lines of this sequence provide good evidence that jets and tori are physically related, and they set new constraints on jet formation scenarios. Some scenarios are ruled out or rendered implausible, and others are challenged at a quantitative level.

  8. The NRC's SPAR Models: Current Status, Future Development, and Modeling Issues

    SciTech Connect (OSTI)

    Robert F. Buell

    2008-09-01

    Probabilistic risk assessments (PRAs) play an increasingly important role in the regulatory framework of the U.S. nuclear power industry. The Nuclear Regulatory Commission (NRC) relies on a set of plant-specific Standardized Plant Analysis Risk (SPAR) models to provide critical risk-based input to the regulatory process. The Significance Determination Process (SDP), Management Directive 8.3 - NRC Incident Investigation Program, Accident Sequence Precursor (ASP) and Mitigating Systems Performance Index (MSPI) programs are among the regulatory initiatives that receive significant input from the SPAR models. Other uses of the SPAR models include: Screening & Resolution of Generic Safety Issues, License Amendment reviews and Notice of Enforcement Discretion (NOEDs). This paper presents the current status of SPAR model development activities, future development objectives, and issues related to the development, verification and maintenance of the SPAR models.

  9. Microsoft PowerPoint - 9_NRC Roundtable Cover_Wensday_NMMSS_2014...

    National Nuclear Security Administration (NNSA)

    and Industry Roundtable Discussion Paul Adam, Wolf Creek Nuclear Operating Corp Suzanne Ani, NRC Brian Horn, NRC...

  10. UNITED STATES NUCLEAR REGUtiTORY COMMISSION REGION I C31 PARK AVENUE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a .

  11. NRC Solomons RFQ | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to: navigation, search Name: NPIProgram JumpNRC

  12. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    NONE

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  13. U.S. NUCLEAR REGULATORY COMMISSION GUIDEOFFICE OF NUCLEAR REGULATORY RESEARCH

    E-Print Network [OSTI]

    Johnson, Eric E.

    U.S. NUCLEAR REGULATORY COMMISSION REGULATORY Revision 3 June 1999 GUIDEOFFICE OF NUCLEAR protection problems present in the work place." The Nuclear Regulatory Commission's (NRC's) regulations REGULATORY RESEARCH REGULATORY GUIDE 8.13 (Draft was issued as DG-801 4) INSTRUCTION CONCERNING PRENATAL

  14. THE GEOMETRY OF EMBEDDED CONSTANT MEAN CURVATURE TORI IN THE 3-SPHERE VIA INTEGRABLE SYSTEMS

    E-Print Network [OSTI]

    Hauswirth, Laurent

    THE GEOMETRY OF EMBEDDED CONSTANT MEAN CURVATURE TORI IN THE 3-SPHERE VIA INTEGRABLE SYSTEMS L Alexandrov embedded cylinders is explicitly determined. We prove that all embedded cmc tori in the 3-sphere are surfaces of revolution using a combination of integrable systems methods and geometric analysis techniques

  15. A renormalization approach to lower-dimensional tori with Brjuno frequency vectors

    E-Print Network [OSTI]

    # 1 , . . . ,# D . The hyper-surface p = 0, # = # = 0, contained in the level set H 0 = 0, is a lower-dimensionalA renormalization approach to lower-dimensional tori with Brjuno frequency vectors Hans Koch ? R m , in order to construct lower-dimensional invariant tori with Brjuno frequency vectors for near

  16. FAST NUMERICAL ALGORITHMS FOR THE COMPUTATION OF INVARIANT TORI IN HAMILTONIAN SYSTEMS

    E-Print Network [OSTI]

    FAST NUMERICAL ALGORITHMS FOR THE COMPUTATION OF INVARIANT TORI IN HAMILTONIAN SYSTEMS GEMMA HUGUET manifolds of whiskered tori. Moreover, we present fast algorithms for the iteration of the quasi and fast. We postpone to a future paper optimized implementations and results on the breakdown of invariant

  17. Proceedings of the 21st DOE/NRC nuclear air cleaning conference; Volume 2, Sessions 9--16

    SciTech Connect (OSTI)

    First, M.W. [ed.] [Harvard Univ., Boston, MA (United States). Harvard Air Cleaning Lab.

    1991-02-01

    The 21st meeting of the Department of Energy/Nuclear Regulatory Commission (DOE/NRC) Nuclear Air Cleaning Conference was held in San Diego, CA on August 13--16, 1990. The proceedings have been published as a two volume set. Volume 2 contains sessions covering adsorbents, nuclear codes and standards, modelling, filters, safety, containment venting and a review of nuclear air cleaning programs around the world. Also included is the list of attendees and an index of authors and speakers. (MHB)

  18. Microsoft PowerPoint - NRC Nuclear Export Controls Implementing...

    National Nuclear Security Administration (NNSA)

    or prepared for" concept in the regulations 6 Appendix A to Part 110-Illustrative List of Nuclear Reactor Equipment Under NRC Export Licensing Authority Note: A nuclear reactor...

  19. Microsoft Word - SmartGrid - NRC Input to DOE Requestrvjcomments...

    Office of Environmental Management (EM)

    Notices) Smart Grid Implementation Input - NRC Contact: Kenn A. Miller, Office of Nuclear Reactor Regulation, 301-415-3152 Comments relevant to the following two sections...

  20. NRC Reviewer Aid for Evaluating the Human Factors Engineering Aspects of Small Modular Reactors

    SciTech Connect (OSTI)

    OHara J. M.; Higgins, J.C.

    2012-01-13

    Small modular reactors (SMRs) are a promising approach to meeting future energy needs. Although the electrical output of an individual SMR is relatively small compared to that of typical commercial nuclear plants, they can be grouped to produce as much energy as a utility demands. Furthermore, SMRs can be used for other purposes, such as producing hydrogen and generating process heat. The design characteristics of many SMRs differ from those of current conventional plants and may require a distinct concept of operations (ConOps). The U.S. Nuclear Regulatory Commission (NRC) conducted research to examine the human factors engineering (HFE) and the operational aspects of SMRs. The research identified thirty potential human-performance issues that should be considered in the NRC's reviews of SMR designs and in future research activities. The purpose of this report is to support NRC HFE reviewers of SMR applications by identifying some of the questions that can be asked of applicants whose designs have characteristics identified in the issues. The questions for each issue were identified and organized based on the review elements and guidance contained in Chapter 18 of the Standard Review Plan (NUREG-0800), and the Human Factors Engineering Program Review Model (NUREG-0711).

  1. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  2. Initial demonstration of the NRC`s capability to conduct a performance assessment for a High-Level Waste Repository

    SciTech Connect (OSTI)

    Codell, R.; Eisenberg, N.; Fehringer, D.; Ford, W.; Margulies, T.; McCartin, T.; Park, J.; Randall, J.

    1992-05-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. This report documents an initial demonstration of this capability. The demonstration made use of the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada. By expanding and developing the NRC staff capability to conduct such analyses, NRC would be better able to conduct an independent technical review of the US Department of Energy (DOE) licensing submittals for a high-level waste (HLW) repository. These activities were divided initially into Phase 1 and Phase 2 activities. Additional phases may follow as part of a program of iterative performance assessment at the NRC. The NRC staff conducted Phase 1 activities primarily in CY 1989 with minimal participation from NRC contractors. The Phase 2 activities were to involve NRC contractors actively and to provide for the transfer of technology. The Phase 2 activities are scheduled to start in CY 1990, to allow Sandia National Laboratories to complete development and transfer of computer codes and the Center for Nuclear Waste Regulatory Analyses (CNWRA) to be in a position to assist in the acquisition of the codes.

  3. Continuous Commissioning

    E-Print Network [OSTI]

    Culp, C.; Claridge, D. E.

    2011-01-01

    and Verification ? Keep Commissioning Continuous ? Involve On-site Staff Opportunity Assessor - OA Utility Bills Questionnaire Electricity (kWh) Gas (MMBtu) March 2010 160,350 418 April 2010 165,420 398 May 2010 171,353 391 1.Area = 172,000 ft2 2....Windows = 25% to 35% 3.OA %= 15 to 30% 4. Fan = VAV ..... Estimated % Energy Cost Savings Yes No Go to Next Building Good Opportunity? - Use WinAM to Determine Measures in Detailed Assessment Opportunity Assessor ? Determine building?s...

  4. Low-energy capture of asteroids onto KAM tori

    E-Print Network [OSTI]

    Patricia E. Verrier; Colin R. McInnes

    2015-01-13

    We present a new method for engineering the artificial capture of asteroids. Based on theories of the chaos-assisted capture of natural satellites of the giant planets, we show how an unbound asteroid that passes close to a regular region of phase space can be easily moved onto the nearby KAM tori and essentially permanently captured with the Earth's Hill sphere without closing the zero velocity curves. The method has the advantages of a relatively low delta-v requirement and no need for control strategies. An illustration of the method is given for an example asteroid trajectory, demonstrating that it is a viable strategy for the final capture stage of asteroids in the Earth's neighbourhood.

  5. Harmonic tori in symmetric spaces and commuting Hamiltonian systems on loop algebras

    E-Print Network [OSTI]

    Harmonic tori in symmetric spaces and commuting Hamiltonian Introduction Background The study of harmonic maps of compact Riemann surfaces into symmetric spaces ca surfaces are (conformal) harmonic maps while constant mean* * curvature surfaces, constant Gauss curvature

  6. Summary of Information Presented at an NRC-Sponsored Low-Power Shutdown Public Workshop, April 27, 1999, Rockville, Maryland

    SciTech Connect (OSTI)

    Wheeler, Timothy A.; Whitehead, Donnie W.; Lois, Erasmia

    1999-07-01

    This report summarizes a public workshop that was held on April 27, 1999, in Rockville, Maryland. The workshop was conducted as part of the US Nuclear Regulatory Commission's (NRC) efforts to further develop its understanding of the risks associated with low power and shutdown operations at US nuclear power plants. A sufficient understanding of such risks is required to support decision-making for risk-informed regulation, in particular Regulatory Guide 1.174, and the development of a consensus standard. During the workshop the NRC staff discussed and requested feedback from the public (including representatives of the nuclear industry, state governments, consultants, private industry, and the media) on the risk associated with low-power and shutdown operations.

  7. Accident Conditions versus Regulatory Test for NRC-Approved UF6 Packages

    SciTech Connect (OSTI)

    MILLS, G. SCOTT; AMMERMAN, DOUGLAS J.; LOPEZ, CARLOS

    2003-01-01

    The Nuclear Regulatory Commission (NRC) approves new package designs for shipping fissile quantities of UF{sub 6}. Currently there are three packages approved by the NRC for domestic shipments of fissile quantities of UF{sub 6}: NCI-21PF-1; UX-30; and ESP30X. For approval by the NRC, packages must be subjected to a sequence of physical tests to simulate transportation accident conditions as described in 10 CFR Part 71. The primary objective of this project was to relate the conditions experienced by these packages in the tests described in 10 CFR Part 71 to conditions potentially encountered in actual accidents and to estimate the probabilities of such accidents. Comparison of the effects of actual accident conditions to 10 CFR Part 71 tests was achieved by means of computer modeling of structural effects on the packages due to impacts with actual surfaces, and thermal effects resulting from test and other fire scenarios. In addition, the likelihood of encountering bodies of water or sufficient rainfall to cause complete or partial immersion during transport over representative truck routes was assessed. Modeled effects, and their associated probabilities, were combined with existing event-tree data, plus accident rates and other characteristics gathered from representative routes, to derive generalized probabilities of encountering accident conditions comparable to the 10 CFR Part 71 conditions. This analysis suggests that the regulatory conditions are unlikely to be exceeded in real accidents, i.e. the likelihood of UF{sub 6} being dispersed as a result of accident impact or fire is small. Moreover, given that an accident has occurred, exposure to water by fire-fighting, heavy rain or submersion in a body of water is even less probable by factors ranging from 0.5 to 8E-6.

  8. NRC Technical Research Program to Evaluate Extended Storage and Transportation of Spent Nuclear Fuel - 12547

    SciTech Connect (OSTI)

    Einziger, R.E.; Compton, K.; Gordon, M.; Ahn, T.; Gonzales, H.; Pan, Y.

    2012-07-01

    Any new direction proposed for the back-end of spent nuclear fuel (SNF) cycle will require storage of SNF beyond the current licensing periods. The Nuclear Regulatory Commission (NRC) has established a technical research program to determine if any changes in the 10 CFR part 71, and 72 requirements, and associated guidance might be necessary to regulate the safety of anticipated extended storage, and subsequent transport of SNF. This three part program of: 1) analysis of knowledge gaps in the potential degradation of materials, 2) short-term research and modeling, and 3) long-term demonstration of systems, will allow the NRC to make informed regulatory changes, and determine when and if additional monitoring and inspection of the systems is necessary. The NRC has started a research program to obtain data necessary to determine if the current regulatory guidance is sufficient if interim dry storage has to be extended beyond the currently approved licensing periods. The three-phased approach consists of: - the identification and prioritization of potential degradation of the components related to the safe operation of a dry cask storage system, - short-term research to determine if the initial analysis was correct, and - a long-term prototypic demonstration project to confirm the models and results obtained in the short-term research. The gap analysis has identified issues with the SCC of the stainless steel canisters, and SNF behavior. Issues impacting the SNF and canister internal performance such as high and low temperature distributions, and drying have also been identified. Research to evaluate these issues is underway. Evaluations have been conducted to determine the relative values that various types of long-term demonstration projects might provide. These projects or follow-on work is expected to continue over the next five years. (authors)

  9. EPRI/NRC-RES fire human reliability analysis guidelines.

    SciTech Connect (OSTI)

    Lewis, Stuart R.; Cooper, Susan E.; Najafi, Bijan; Collins, Erin; Hannaman, Bill; Kohlhepp, Kaydee; Grobbelaar, Jan; Hill, Kendra; Hendrickson, Stacey M. Langfitt; Forester, John Alan; Julius, Jeff

    2010-03-01

    During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support current requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting a fire HRA. This process includes identification and definition of post-fire human failure events, qualitative analysis, quantification, recovery, dependency, and uncertainty. This document provides three approaches to quantification: screening, scoping, and detailed HRA. Screening is based on the guidance in NUREG/CR-6850, with some additional guidance for scenarios with long time windows. Scoping is a new approach to quantification developed specifically to support the iterative nature of fire PRA quantification. Scoping is intended to provide less conservative HEPs than screening, but requires fewer resources than a detailed HRA analysis. For detailed HRA quantification, guidance has been developed on how to apply existing methods to assess post-fire fire HEPs.

  10. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    SciTech Connect (OSTI)

    Suber, Gregory [Nuclear Regulatory Commission (United States)

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed on tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)

  11. Types of Commissioning

    Broader source: Energy.gov [DOE]

    Several commissioning types exist to address the specific needs of equipment and systems across both new and existing buildings. The following commissioning types provide a good overview.

  12. River Basin Commissions (Indiana)

    Broader source: Energy.gov [DOE]

    This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

  13. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect (OSTI)

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  14. Hamilton--Jacobi's equation and Arnold's diffusion near invari ant tori in a priori unstable isochronous systems.

    E-Print Network [OSTI]

    Roma "La Sapienza", Università di

    Hamilton--Jacobi's equation and Arnold's diffusion near invari­ ant tori in a priori unstable. Keywords: Hamilton Jacobi, KAM, Arnold diffusion, invariant tori 1. Introduction. Here I expose ! jRe J 0 (x)j Ÿ jJ 0 (x)j ! 2g 0 for all jxj ! Ÿ. The Hamilton Jacobi's equation for the integration

  15. Introduction To GIS Course Syllabus Introduction to GIS NRC585

    E-Print Network [OSTI]

    Bradley, Bethany

    - 1 Introduction To GIS Course Syllabus Introduction to GIS NRC585 Lecture: Thurs. 1:00 - 2: by appointment Email: bbradley@eco.umass.edu Email: tcross@eco.umass.edu Website: http://people.umass.edu/bethanyb/gis.html Course Objective: To provide an understanding of the basic concepts and uses of GIS technology

  16. DOE Makes Filing with NRC in Support OF Authority to Withdraw Yucca Application

    Broader source: Energy.gov [DOE]

    DOE today urged the NRC to conclude that DOE has the legal authority to withdraw the pending Yucca Mountain license application. DOE argued that the NRC should review and reverse the contrary...

  17. Harmonic tori in spheres and complex projective spaces F. E. Burstall

    E-Print Network [OSTI]

    Burstall, Fran E.

    Harmonic tori in spheres and complex projective spaces F. E. Burstall Introduction A map : M N of Riemannian manifolds is harmonic if it extremises the energy functional: |d|2 dvol on every compact subdomain of M. Harmonic maps arise in many different contexts in Geometry and Physics (for an overview, see [16

  18. Harmonic tori in symmetric spaces and commuting Hamiltonian systems on loop algebras

    E-Print Network [OSTI]

    Harmonic tori in symmetric spaces and commuting Hamiltonian systems on loop algebras F. E. Burstall, D. Ferus, F. Pedit, and U. Pinkall Introduction Background The study of harmonic maps of compact and Physics: For example, minimal surfaces are (conformal) harmonic maps while constant mean curvature

  19. Harmonic tori in spheres and complex projective spaces F. E. Burstall

    E-Print Network [OSTI]

    Bath, University of

    Harmonic tori in spheres and complex projective spaces F. E. Burstall Introduction A map OE : M ! N of Riemannian manifolds is harmonic if it extremises the energy functional: Z jdOEj 2 dvol on every compact subdomain of M . Harmonic maps arise in many different contexts in Geometry and Physics (for an overview

  20. HARMONIC TORI IN DE SITTER SPACES S2n EMMA CARBERRY, KATHARINE TURNER

    E-Print Network [OSTI]

    Sydney, University of

    HARMONIC TORI IN DE SITTER SPACES S2n 1 EMMA CARBERRY, KATHARINE TURNER Abstract. We show that all superconformal harmonic immersions from genus one surfaces into de Sitter spaces S2n 1 with globally defined harmonic sequence are of finite-type and hence result merely from solving a pair of ordinary differential

  1. THE CLOSURE OF SPECTRAL DATA FOR CONSTANT MEAN CURVATURE TORI IN S3

    E-Print Network [OSTI]

    Sydney, University of

    , Jag94, Car07, CM04]. In each of these cases the existence of a family of dimension g corresponds in the study of CMC tori as by encoding geometric information in the algebraic data one obtains a new toolbox with which to prove theorems. For example, Hitchin expressed the energy of a harmonic map into S3 explicitly

  2. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This document provides functional organization charts for all NRC Offices and Regions, and their components.

  3. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Reliant and BP Energy at the Palo Verde trading hub in Arizona. BP Energy separately settled its endFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT Energy Regulatory Commission today approved a settlement between the Commission's enforcement staff

  4. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    outages during California's energy crisis in 2000 and 2001. Since then, OMOI has reviewed additional dataFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT SETTLEMENT BETWEEN DUKE AND COMMISSION STAFF The Federal Energy Regulatory Commission today accepted

  5. Going the Distance? NRC's Response to the National Academy of Science's Transportation Study

    SciTech Connect (OSTI)

    Easton, E.P.; Bajwa, C.S.

    2008-07-01

    In February 2006, the National Academy of Sciences (NAS) published the results of a 3 1/2-year study, titled Going the Distance, that examined the safety of transporting spent nuclear fuel (SNF) and high level waste (HLW) in the United States. NAS initiated this study to address what it perceived to be a national need for an independent, objective, and authoritative analysis of SNF and HLW transport in the United States. The study was co-sponsored by the U.S. Nuclear Regulatory Commission (NRC), the U.S. Department of Energy (DOE), the U.S. Department of Transportation (DOT), the Electric Power Research Institute and the National Cooperative Highway Research Program. This paper addresses some of the recommendations made in the NAS study related to the performance of SNF transportation casks in long duration fires, the use of full-scale package testing, and the need for an independent review of transportation security prior to the commencement of large scale shipping campaigns to an interim storage site or geologic repository. In conclusion: The NRC believes that the current regulations in 10 CFR Part 71 for the design of SNF and HLW transportation packages provide a very high level of protection to the public for very severe accidents and credible threat scenarios. As recommended by the NAS study, additional studies of accidents involving severe fires have been completed. These studies have confirmed that spent fuel casks would be expected to withstand very severe fires without the release of any fission products from the spent fuel. Additionally, changes in rail operating procedures such as the use of dedicated trains and prohibition on the co-location of SNF and flammable liquids in rail tunnels can further reduce the already low probability of severe rail accident fires involving SNF and HLW. (authors)

  6. 1995 revisions to the DOT/NRC transport regulations and their impact on nuclear power plants

    SciTech Connect (OSTI)

    Grella, A.W.

    1996-10-01

    On September 28, 1995, the U.S. Department of Transportation (DOT) and the U.S. Nuclear Regulatory Commission (NRC) published major amendments to the nuclear transportation regulations of the US. The amendments culminated an approximate 8-year effort of the two agencies to conform US regulations (to the extent practicable) to the international transport standards of the International Atomic Energy Agency (IAEA) Safety Series N. 6, {open_quotes}Regulations For The Safe Transport of Radioactive Material{close_quotes}, 1985 Edition (Revised 1990). This paper identifies the major revisions to the regulations which have taken place and discusses not only their probable future impacts but also identifies certain issues and early impacts which have been emerging since publication of the final rules late in 1995. The discussion is summarized with respect to these impacts and issues on transportation of radioactive material by the nuclear power industry. Many of the revisions which are more minor in nature are also identified. The generic effective date for mandatory compliance with the revised regulations was April 1, 1996, however two of the major revisions of interest to the utilities have later effective dates for mandatory compliance. The use of the so-called {open_quotes}NRC-Certified Type A LSA Packages{close_quotes} are authorized until April 1, 1999 and mandatory compliance with the new radiation protection program requirements of 49 CFR 172 Subpart I is not until October 1, 1997. This paper is based to a large extent on the EPRI report bearing the same title as this paper, which is currently in draft.

  7. Agenda Highlights: 2012 DOE-NRC NMMSS Annual User Training

    National Nuclear Security Administration (NNSA)

    Agreement AwardsRecognitions Update on Blue Ribbon Commission Report (Tentative) Cyber security Issues and Implications GAO report on Tracking Overseas Material Ownership...

  8. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    SciTech Connect (OSTI)

    NONE

    1994-12-31

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

  9. NAS/NRC Report:NAS/NRC Report: Health Risks from Dioxin and RelatedHealth Risks from Dioxin and Related

    E-Print Network [OSTI]

    Doty, Sharon Lafferty

    NAS/NRC Report:NAS/NRC Report: Health Risks from Dioxin and RelatedHealth Risks from Dioxin Provost for Research University of WashingtonUniversity of Washington #12;Dioxins, Dibenzofurans and PCBs Chlorinated Dioxins represent a class of compounds, of which 7 are included in EPA regulations (Contaminants

  10. Numerical Computation of the Stable and Unstable Manifolds of Invariant Tori

    E-Print Network [OSTI]

    Derin B. Wysham; James D. Meiss

    2005-04-26

    We develop an iterative technique for computing the unstable and stable eigenfunctions of the invariant tori of diffeomorphisms. Using the approach of Jorba, the linearized equations are rewritten as a generalized eigenvalue problem. Casting the system in this light allows us to take advantage of the speed of eigenvalue solvers and create an efficient method for finding the first order approximations to the invariant manifolds of the torus. We present a numerical scheme based on the power method that can be used to determine the behavior normal to such tori, and give some examples of the application of the method. We confirm the qualitative conclusions of the Melnikov calculations of Lomel\\'i and Meiss (2003) for a volume-preserving mapping.

  11. Power-Law Energy Splitting Generated By Tunneling Between Non-smooth Tori

    E-Print Network [OSTI]

    Z. Q. Bai

    2001-12-20

    We discuss the energy level splitting $\\Delta\\epsilon$ due to quantum tunneling between congruent tori in phase space. In analytic cases, it is well known that $\\Delta\\epsilon$ decays faster than power of $\\hbar$ in the semi-classical limit. This is not true in non-smooth cases, specifically, when the tori are connected by line on which the Hamiltonian is not smooth. Under the assumption that the non-smoothness depends only upon the x- or p-coordinate, the leading term in the semi-classical expansion of $\\Delta\\epsilon$ is derived, which shows that $\\Delta \\epsilon$ decays as $\\hbar^{k+1}$ when $\\hbar\\to 0$ with k being the order of non-smoothness.

  12. Supersymmetry algebra and BPS states of super Yang-Mills theories on noncommutative tori

    E-Print Network [OSTI]

    A. Konechny; A. Schwarz

    1999-01-18

    We consider 10-dimensional super Yang-Mills theory with topological terms compactified on a noncommutative torus. We calculate supersymmetry algebra and derive BPS energy spectra from it. The cases of d-dimensional tori with d=2,3,4 are considered in full detail. SO(d,d|Z)-invariance of the BPS spectrum and relation of new results to the previous work in this direction are discussed.

  13. Guidelines for residential commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to such houses.

  14. NRC Institute for Fuel Cell Innovation | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to: navigation, search Name: NPIProgram JumpNRC Institute

  15. ISDAC - NRC Convair-580 Flight Hours Date Flight

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (JournalvivoHighHussein KhalilResearch88 Sign In About | Workshop for- NRC

  16. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Enron's activities during the 2000-2001 Western energy crisis, and approved three other settlementsFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON,D.C.20426 NEWS RELEASE NEWS MEDIA CONTACT JURISDICTION UNDER SECTION 1290 OF EPACT The Federal Energy Regulatory Commission today approved a settlement

  17. Energy/Environment/Commissioning

    E-Print Network [OSTI]

    Nakahara, N.

    2006-01-01

    Nobuo NakaharaNobuo Nakahara ICEBO/APCBCAsia Pacific Conference on Building Commissioning 2006.11.7 Opening AddressOpening AddressEnergy/Environment/CommissioningEnergy/Environment/Commissioning Call for Call for partipationpartipation...%45%42%39%36%15%10%10%9%9%7%12%13%14%15%12%18%19%20%21%4%4%5%5%6%1%4%4%5%5%4%5%5%6%7% 02,0004,0006,0008,00010,00012,00014,00016,00018,00019712002201020202030 ?????????? 5,53610,34512,19414,40416,487OECD?????????????????????????????? ????IEA/World Energy Outlook 2004 Actual and Estimated Energy Demand in the World Africa Middle East...

  18. FORESTRY COMMISSION Mechanical Engineering Services

    E-Print Network [OSTI]

    1 FORESTRY COMMISSION Mechanical Engineering Services TENDER SALE of surplus Forestry Commission to be in Sterling. 3. Tenders will be subject to VAT @ 20% 4. The Forestry Commission reserves the right

  19. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  20. Commissioning for High Performance

    E-Print Network [OSTI]

    Meline, K.

    2013-01-01

    Councils ? BREEAM Estidama ? Pearl Rating System World Green Building Council ? No independent rating system ESL-KT-13-12-46 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 COMMISSIONING Commonality in All...

  1. Nuclear Regulatory Commission authorization for Fiscal Year 1981. Hearing before the Subcommittee on Energy and Power of the Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-Sixth Congress, Second Session. [Committee print

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The statements of eleven witnesses from the Nuclear Regulatory Commission (NRC) presented at a Congressional hearing on February 22, 1980 are reproduced along with additional material submitted for the record. At issue was the NRC's authorization request for fiscal year 1981. The testimony included a review of 1979 activities, including the Three Mile Island accident, and an agenda for future action. Budget justifications were made on the basis of these proposals. Committee members challenged NRC witnesses on their performance, state personnel recruitment and training, public safety, and other matters. (DCK)

  2. Switzerland Suisse Swiss Geodetic Commission Commission Godsique Suisse

    E-Print Network [OSTI]

    Giger, Christine

    Switzerland Suisse Swiss Geodetic Commission Commission Godsique Suisse Swiss National Report;#12;Switzerland Suisse Swiss Geodetic Commission Commission Godsique Suisse Swiss National Report Switzerland http://www.sgc.ethz.ch/publications Edited by: J. Mueller-Gantenbein, Secretary of the SGC A

  3. Moduli spaces of maximally supersymmetric solutions on noncommutative tori and noncommutative orbifolds

    E-Print Network [OSTI]

    A. Konechny; A. Schwarz

    2000-05-19

    A maximally supersymmetric configuration of super Yang-Mills living on a noncommutative torus corresponds to a constant curvature connection. On a noncommutative toroidal orbifold there is an additional constraint that the connection be equivariant. We study moduli spaces of (equivariant) constant curvature connections on noncommutative even-dimensional tori and on toroidal orbifolds. As an illustration we work out the cases of Z_{2} and Z_{4} orbifolds in detail. The results we obtain agree with a commutative picture describing systems of branes wrapped on cycles of the torus and branes stuck at exceptional orbifold points.

  4. Canister storage building compliance assessment SNF project NRC equivalency criteria - HNF-SD-SNF-DB-003

    SciTech Connect (OSTI)

    BLACK, D.M.

    1999-08-11

    This document presents the Project's position on compliance with the SNF Project NRC Equivalency Criteria--HNF-SD-SNF-DE-003, Spent Nuclear Fuel Project Path Forward Additional NRC Requirements. No non-compliances are shown The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion.

  5. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    SciTech Connect (OSTI)

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  6. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    that this might mitigate losses in Reliant's existing forward positions. The vice-president of power trading, who POWER EXCHANGE MARKET The Federal Energy Regulatory Commission today approved a staff settlement calling for Reliant Energy to pay $13.8 million for limiting the amount of power it offered to the California Power

  7. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    . AGREEMENT ACCEPTED BETWEEN ENRON AND NEVADA COMPANIES SETTLING MATTERS STEMMING FROM WESTERN ENERGY CRISIS the 2000-2001 Western energy crisis. "This is another in a long line of settlements the Commission has approved in the wake of the Western energy crisis. Further settlement of issues still outstanding from

  8. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    in bringing closure to the 2000-2001 energy crisis. Settlements are in the best interests of all parties and I the 2000-2001 energy crisis valued at more than $6.3 billion. Additional information on the Commission's comprehensive actions in response to the 2000-2001 Western energy crisis, along with a list of the related

  9. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    -2001 Western energy crisis, said Commission Chairman Joseph T. Kelliher. "The parties are to be congratulated remaining disputes stemming from the energy crisis five years ago. "While expediting our pending refund the investment in power plants and transmission needed to prevent another energy crisis in California," Chairman

  10. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    NONE

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  11. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  12. A RE-LOOK AT THE US NRC SAFETY GOALS

    SciTech Connect (OSTI)

    mubayi v.

    2013-09-22

    Since they were adopted in 1986, the US NRCs Safety Goals have played a valuable role as a de facto risk acceptance criterion against which the predicted performance of a commercial nuclear power reactor can be evaluated and assessed. The current safety goals are cast in terms of risk metrics called quantitative health objectives (QHOs), limiting numerical values of the risks of the early and latent health effects of accidental releases of radioactivity to the offsite population. However, while demonstrating compliance with current safety goals has been an important step in assessing the acceptance of the risk posed by LWRs, new or somewhat different goals may be needed that go beyond the current early fatality and latent cancer fatality QHOs in assessing reactor risk. Natural phenomena such as hurricanes seem to be suitable candidates for establishing a background rate to derive a risk goal as their order of magnitude cost of damages is similar to those estimated in severe accident Level 3 PRAs done for nuclear power plants. This paper obtains a risk goal that could have a wider applicability, compared to the current QHOs, as a technology-neutral goal applicable to future reactors and multi-unit sites.

  13. US NRC-Sponsored Research on Stress Corrosion Cracking Susceptibility of Dry Storage Canister Materials in Marine Environments - 13344

    SciTech Connect (OSTI)

    Oberson, Greg; Dunn, Darrell; Mintz, Todd; He, Xihua; Pabalan, Roberto; Miller, Larry

    2013-07-01

    At a number of locations in the U.S., spent nuclear fuel (SNF) is maintained at independent spent fuel storage installations (ISFSIs). These ISFSIs, which include operating and decommissioned reactor sites, Department of Energy facilities in Idaho, and others, are licensed by the U.S. Nuclear Regulatory Commission (NRC) under Title 10 of the Code of Federal Regulations, Part 72. The SNF is stored in dry cask storage systems, which most commonly consist of a welded austenitic stainless steel canister within a larger concrete vault or overpack vented to the external atmosphere to allow airflow for cooling. Some ISFSIs are located in marine environments where there may be high concentrations of airborne chloride salts. If salts were to deposit on the canisters via the external vents, a chloride-rich brine could form by deliquescence. Austenitic stainless steels are susceptible to chloride-induced stress corrosion cracking (SCC), particularly in the presence of residual tensile stresses from welding or other fabrication processes. SCC could allow helium to leak out of a canister if the wall is breached or otherwise compromise its structural integrity. There is currently limited understanding of the conditions that will affect the SCC susceptibility of austenitic stainless steel exposed to marine salts. NRC previously conducted a scoping study of this phenomenon, reported in NUREG/CR-7030 in 2010. Given apparent conservatisms and limitations in this study, NRC has sponsored a follow-on research program to more systematically investigate various factors that may affect SCC including temperature, humidity, salt concentration, and stress level. The activities within this research program include: (1) measurement of relative humidity (RH) for deliquescence of sea salt, (2) SCC testing within the range of natural absolute humidity, (3) SCC testing at elevated temperatures, (4) SCC testing at high humidity conditions, and (5) SCC testing with various applied stresses. Results to date indicate that the deliquescence RH for sea salt is close to that of MgCl{sub 2} pure salt. SCC is observed between 35 and 80 deg. C when the ambient (RH) is close to or higher than this level, even for a low surface salt concentration. (authors)

  14. Nuclear Crisis Communications: The Plan Worked. A Critique of NRC Communications in the Fukushima Daiichi Reactor Crisis - 12073

    SciTech Connect (OSTI)

    Brenner, Eliot; Harrington, Holly; Schmidt, Rebecca [U.S. Nuclear Regulatory Commission, Rockville, MD 20852 (United States)

    2012-07-01

    'Call the AV-Photo folks and get someone in here to shoot b-roll. We'll never be able to accommodate the network cameras and the only way I can get this to the media is to produce it ourselves'. Eliot Brenner, Director NRC Office of Public Affairs, March 12, 2011. For the past four years we have been speaking to audiences at Waste Management about communications issues. Last year, though we were kept from attending because of the federal budget crisis, our surrogates described to you the lessons the nuclear industry should draw from the BP Gulf oil spill crisis. Those remarks were delivered 11 days before the Fukushima Daiichi tragedy became the nuclear landmark of a generation - an industry changing event with worldwide ramifications, both in science and regulation and in communications. Eliot Brenner cut his teeth on crisis communication in the aviation industry where tragedy unfolds rapidly. He has been a speech-writer to three cabinet secretaries, spokesman for the Federal Aviation Administration and now spokesman for the Nuclear Regulatory Commission since 2004. Holly Harrington manages the NRC crisis response program and has 26 years federal public affairs experience, including eight years at the Federal Emergency Management Agency. Her crisis experience includes the 1989 Loma Prieta earthquake, numerous hurricanes and floods, Sept 11, and, now Fukushima Daiichi. Rebecca Schmidt is a veteran government relations professional whose decades in Washington include service with the House Armed Services Committee, the House Budget Committee and the Secretary of Defense. Collectively, the Offices of Public Affairs and Congressional Affairs conducted the largest outreach for the agency since Three Mile Island. We worked with the basic rule, described to Waste Management last year just 11 days before Fukushima - communicate early, often and clearly. The response - while not without its problems and lessons - went as smoothly as a chaotic event like Fukushima could go. That was due in large measure to the fact that the NRC has a well-tested system of responding to nuclear emergencies, and we followed our plan. (authors)

  15. Federal Communications Commission FCC 02-48 Federal Communications Commission

    E-Print Network [OSTI]

    Federal Communications Commission FCC 02-48 Before the Federal Communications Commission Washington-Wideband Transmission Systems ) ) ) ) ) ) ET Docket 98-153 FIRST REPORT AND ORDER Adopted: February 14, 2002 Released. Imaging Systems

  16. New Forestry Commission District Office The new Forestry Commission

    E-Print Network [OSTI]

    New Forestry Commission District Office The new Forestry Commission District office at Smithton in construction The Forestry Commission's District office at Smithton in Inverness, Scotland, covers the national fuel heating system has proved effective during the winter of 2009/10, one of the harshest in 40 years

  17. COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Sixth Edition Gonalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

  18. California Energy Commission CONSULTANT REPORT

    E-Print Network [OSTI]

    roofs and the energy requirement for renovated lighting systems to meet the new 2013 energyCalifornia Energy Commission CONSULTANT REPORT IMPACT ANALYSIS California's 2013 Building Energy Efficiency Standards JULY 2013 CEC4002013008 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr

  19. Can. J. Zool. 76: 10631079 (1998) 1998 NRC Canada The turning-and linear-maneuvering

    E-Print Network [OSTI]

    Warrick, Douglas R.

    1998-01-01

    Can. J. Zool. 76: 10631079 (1998) 1998 NRC Canada 1063 The turning- and linear; Norberg and Rayner 1987). But because most bird flight is flapping flight (thus violating the assumption

  20. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE...

    National Nuclear Security Administration (NNSA)

    Len Myers Special Requests (301) 903-2180 Len.Myers@nnsa.doe.gov Patricia Smith NRC Reconciliation (301) 903-6860 PatriciaR.Smith@nnsa.doe.gov Reasons to Call NMMSS -...

  1. A Guide to Building Commissioning

    SciTech Connect (OSTI)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  2. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear...

  3. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    SciTech Connect (OSTI)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  4. ATOMIC ENERGY COMMISSION C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation DataStreamsTotalproposals duenationalMeeting - JuneCOMMISSION C

  5. NRC Monitoring of Salt Waste Disposal at the Savannah River Site - 13147

    SciTech Connect (OSTI)

    Pinkston, Karen E.; Ridge, A. Christianne; Alexander, George W.; Barr, Cynthia S.; Devaser, Nishka J.; Felsher, Harry D.

    2013-07-01

    As part of monitoring required under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA), the NRC staff reviewed an updated DOE performance assessment (PA) for salt waste disposal at the Saltstone Disposal Facility (SDF). The NRC staff concluded that it has reasonable assurance that waste disposal at the SDF meets the 10 CFR 61 performance objectives for protection of individuals against intrusion (chap.61.42), protection of individuals during operations (chap.61.43), and site stability (chap.61.44). However, based on its evaluation of DOE's results and independent sensitivity analyses conducted with DOE's models, the NRC staff concluded that it did not have reasonable assurance that DOE's disposal activities at the SDF meet the performance objective for protection of the general population from releases of radioactivity (chap.61.41) evaluated at a dose limit of 0.25 mSv/yr (25 mrem/yr) total effective dose equivalent (TEDE). NRC staff also concluded that the potential dose to a member of the public is expected to be limited (i.e., is expected to be similar to or less than the public dose limit in chap.20.1301 of 1 mSv/yr [100 mrem/yr] TEDE) and is expected to occur many years after site closure. The NRC staff used risk insights gained from review of the SDF PA, its experience monitoring DOE disposal actions at the SDF over the last 5 years, as well as independent analysis and modeling to identify factors that are important to assessing whether DOE's disposal actions meet the performance objectives. Many of these factors are similar to factors identified in the NRC staff's 2005 review of salt waste disposal at the SDF. Key areas of interest continue to be waste form and disposal unit degradation, the effectiveness of infiltration and erosion controls, and estimation of the radiological inventory. Based on these factors, NRC is revising its plan for monitoring salt waste disposal at the SDF in coordination with South Carolina Department of Health and Environmental Control (SCDHEC). DOE has completed or begun additional work related to salt waste disposal to address these factors. NRC staff continues to evaluate information related to the performance of the SDF and has been working with DOE and SCDHEC to resolve NRC staff's technical concerns. (authors)

  6. Building Commissioning in the USA

    E-Print Network [OSTI]

    Castro, N.; Friedman, H.

    2006-01-01

    $50 billion/yr for energy? Cx energy savings range: 6% - 9% ? California Market Characterization Study (2000) ? RCx energy savings range: 7% - 30 % ? LBNL study: The Cost-Effectiveness of Commissioning New and Existing Commercial Buildings: Lessons... Commissioning in the USA Natascha Castro, Annex 47- US Team Leader National Institute of Standards and Technology Hannah Friedman, Cost-Benefit Subtask Leader Portland Energy Conservation, Inc. Asian Pacific Conference on Building Commissioning November 7, 2006...

  7. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    California Energy Commission STAFF REPORT FINAL EVALUATION REPORT 2008 Building Energy the evaporator coil by drilling of Temperature Measurement Access Holes for the placement of temperature sensors

  8. Rappahannock River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rappahannock River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the...

  9. Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the U.S. Code of Federal Regulations as codified on December 31, 1993; Revision 1

    SciTech Connect (OSTI)

    Collins, M.; Shelton, B.

    1994-07-01

    This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the code of Federal Regulations, Chapter 1, on December 31, 1993. It also includes, in a separate section, any of those requirements that were superseded or discontinued between January 1992 and December 1993. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation. The Office of Information Resources Management staff compiled this listing of reporting and recordkeeping requirements to briefly describe each in a single document primarily to help licensees readily identify the requirements. The compilation is not a substitute for the regulations, and is not intended to impose any new requirements or technical positions. It is part of NRC`s continuing efforts to comply with the Paperwork Reduction Act of 1980 and the Office of Management and Budget regulations that mandate effective and efficient Federal information resources management programs.

  10. California Energy Commission ADOPTED REGULATIONS

    E-Print Network [OSTI]

    and Energy Division 2. State Energy Resources Conservation and Development Commission Chapter 4. Energy Resources Code Section 25402.10, for disclosing energy use data and ENERGY STAR Energy Performance ScoresCalifornia Energy Commission ADOPTED REGULATIONS FEBRUARY 2013 CEC-400-2010-004-CMF

  11. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    Fuel and Vehicle Technology Program Under Solicitation PON-09-604 #12;CALIFORNIA ENERGY COMMISSION impacts report assesses and reports on the potential localized health impacts of this additional fuelCalifornia Energy Commission STAFF REPORT MAY 2011 CEC-600-2010-009-AD2 LOCALIZED HEALTH IMPACTS

  12. Superfund Policy Statements and Guidance Regarding Disposition of Radioactive Waste in Non-NRC Licensed Disposal Facilities - 13407

    SciTech Connect (OSTI)

    Walker, Stuart

    2013-07-01

    This talk will discuss EPA congressional testimony and follow-up letters, as well as letters to other stakeholders on EPA's perspectives on the disposition of radioactive waste outside of the NRC licensed disposal facility system. This will also look at Superfund's historical practices, and emerging trends in the NRC and agreement states on waste disposition. (author)

  13. NRC TLD Direct Radiation Monitoring Network progress report, October--December 1994. Volume 14, No. 4

    SciTech Connect (OSTI)

    Struckmeyer, R.

    1995-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1994. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

  14. NRC Earth Science Decadal Survey-Mission Concept Earth Sciences from the Astronomer's Perspective, a Deep

    E-Print Network [OSTI]

    Christian, Eric

    NRC Earth Science Decadal Survey-Mission Concept Earth Sciences from the Astronomer's Perspective Irina Melnikova #12;1 Earth Sciences from the Astronomer's Perspective 1.0 Mission Concept and Purpose Earth observations from satellites located in deep space offer the exciting opportunity to look

  15. Types of Cost in Inductive Concept Learning Peter Turney PETER.TURNEY@NRC.CA

    E-Print Network [OSTI]

    Weiss, Gary

    Types of Cost in Inductive Concept Learning Peter Turney PETER.TURNEY@NRC.CA Institute of classes. In real-world applications of concept learning, there are many different types of cost involved. The majority of the machine learning literature ignores all types of cost (unless accuracy is interpreted

  16. Commissioning and Retro Commissioning Programs for Energy Efficiency

    E-Print Network [OSTI]

    Kuklarni, A.

    2011-01-01

    to customer identifying inefficiencies and suggested improvements ? Vendor provided trends and savings analysis as per IPMVP protocols (Option B or Option C) www.powerofaction.com/efficiency 15 Monitoring Based Commissioning Approach Submit Pre...

  17. US Nuclear Regulatory Commission functional organization charts. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The report consists entirely of organizational charts of the US NRC, with functional notes for each office. (GHT)

  18. Web-Based Training on Reviewing Dose Modeling Aspects of NRC Decommissioning and License Termination Plans

    SciTech Connect (OSTI)

    LePoire, D.; Cheng, J.J.; Kamboj, S.; Arnish, J.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2008-01-15

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course was developed in 2006 and 2007 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The objective of this course is to train NRC headquarters and regional office staff on how to review sections of a licensee's DP or LTP that pertain to dose modeling. The DP generally refers to the decommissioning of non-reactor facilities, while the LTP refers specifically to the decommissioning of reactors. This review is part of the NRC's licensing process, in which the NRC determines if a licensee has provided a suitable technical basis to support derived concentration guideline levels (DCGLs)1 or dose modeling analyses performed to demonstrate compliance with dose-based license termination rule criteria. This type of training is one component of an organizational management system. These systems 'use a range of practices to identify, create, represent, and distribute knowledge for reuse, awareness and learning'. This is especially important in an organization undergoing rapid change or staff turnover to retain organizational information and processes. NRC is committed to maintaining a dynamic program of training, development, and knowledge transfer to ensure that the NRC acquires and maintains the competencies needed to accomplish its mission. This paper discusses one specific project related to training, developing, and transferring knowledge to NRC staff on how to review dose-modeling portions of licensee-submitted DPs and LTPs. This project identified specific cases and examples, created easily updateable educational modules, represented material in an engaging format through animations, video, and graphics, and distributed information on how to perform these reviews in an accessible, web-based format. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT will provide reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling will promote staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities. One of the key advantages of this type of web-based training is that it can be loaded on-demand and can be reused indefinitely. In addition to the benefits of on-demand training, the modules can also be used for reference. The presentations are hosted on a web server that can be accessed by registered users at any time. Staff can return to a particular module to review the material long after they have completed the course.

  19. COMMISSION REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    COMMISSION REPORT RENEWABLE ENERGY PROGRAM 2011 ANNUAL REPORT Authors Lorraine Gonzalez Madeleine Meade Project Manager Tony Gonalves Office Manager Renewable Energy Office Panama Bartholomy Deputy Director Energy Efficiency and Renewables Division Robert Oglesby

  20. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    California Energy Commission STAFF REPORT DRAFT EVALUATION REPORT Proposed Compliance Option of temperature sensors. Section RA3.2.2.2.2 of the reference appendices specifies the location and hole

  1. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    on the potential localized health impacts of this additional fuel production project recommendedCalifornia Energy Commission STAFF REPORT MARCH 2011 CEC-600-2010-004-AD Awarded Funding Through the Alternative and Renewable Fuel and Vehicle Technology

  2. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    on the potential localized health impacts of this additional fuel production project recommendedCalifornia Energy Commission STAFF REPORT MARCH 2011 CEC-600-2010-009-AD Projects Awarded Funding Through the Alternative and Renewable Fuel and Vehicle

  3. Orlando Utilities Commission- Solar Programs

    Broader source: Energy.gov [DOE]

    The Orlando Utilities Commission (OUC) also offers incentive for solar hot water heating systems.Commercial solar hot water heating systems receive a $0.03 per kWh equivalent. Residential...

  4. Rivanna River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

  5. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect (OSTI)

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  6. Delmarva- Commissioning and Operations Incentive Programs

    Broader source: Energy.gov [DOE]

    Delmarva's Enhanced Commissioning Program offers building design and commissioning incentives to commercial, industrial, governmental and institutional customers planning large new buildings....

  7. PEPCO- Commissioning and Operations Incentive Programs

    Broader source: Energy.gov [DOE]

    Pepco's Enhanced Commissioning Program offers building design and commissioning incentives to commercial, industrial, governmental and institutional customers planning large new buildings....

  8. Nuclear Regulatory Commission's Integrated Strategy for Spent...

    Office of Environmental Management (EM)

    Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future Nuclear Regulatory Commission's...

  9. Energy Department Highlights Commissioning of Innovative Fuel...

    Energy Savers [EERE]

    Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground Energy Department Highlights Commissioning of Innovative Fuel Cell System at U.S....

  10. Portland Community College Celebrates Commissioning of Combined...

    Energy Savers [EERE]

    Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel Cell System Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel...

  11. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  12. A Characteristics-Based Approach to Radioactive Waste Classification in Advanced Nuclear Fuel Cycles

    E-Print Network [OSTI]

    Djokic, Denia

    2013-01-01

    NRC 2008 Nuclear Regulatory Commission, Response neptunium Nuclear Regulatory Commission Neptunium (bodies, the Nuclear Regulatory Commission (NRC)

  13. National Commission for Further and

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    improvement in the management of the quality of higher education. To this end, QM carries out reviews of UK Where appropriate and possible, in operations relating to quality assurance of higher education within the Quality Assurance Agency for Higher Education, United Kingdom and the National Commission for Further

  14. Forestry Commission Sale of Timber

    E-Print Network [OSTI]

    .e. the trees to be left standing after harvesting operation. Purchasers will be deemed to have acquainted of the Harvesting Site Plan from relevant Forest District Managers for each standing sale. These plans detail with the provisions of the Forestry Commission's Forests and Water Guidelines publication and to ensure

  15. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    energy, gasoline, diesel, jet fuel, ethanol, E85, propane, biodiesel, transportation fuel demand, demandCalifornia Energy Commission STAFF REPORT TRANSPORTATION FUEL PRICE CASES AND DEMAND SCENARIOS methods and inputs to be used for preparing long-term transportation energy demand scenarios. Price

  16. INTERNATIONAL COMMISSION ON LARGE DAMS

    E-Print Network [OSTI]

    Bowles, David S.

    Q76-R INTERNATIONAL COMMISSION ON LARGE DAMS 20TH CONGRESS BEIJING, CHINA THE STATUS OF METHODS FOR ESTIMATION OF THE PROBABILITY OF FAILURE OF DAMS FOR USE IN QUANTITATIVE RISK ASSESSMENT (* ) Robin FELL. INTRODUCTION The use of Quantitative Risk Assessment (QRA) techniques to assist in dam safety management

  17. Commission.

    National Nuclear Security Administration (NNSA)

    in this invaluable learning opportunity. NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear...

  18. Commission.

    National Nuclear Security Administration (NNSA)

    Security Site (NNSS), formerly known as the Nevada Test Site (NTS). Below are some pictures of the tour groups at the Nevada National Security Site. Page 4 April 2014 November...

  19. Commission.

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReporteeo | National NuclearaCSGFNuclear SecurityCommanding

  20. Commission.

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia National 1 PAGE 1 OF2Guidance to the1 1Combined

  1. Commission.

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia National 1 PAGE 1 OF2Guidance to the1 1CombinedMarch

  2. Using Simulation Models for Building Commissioning

    E-Print Network [OSTI]

    Claridge, D. E.

    2004-01-01

    The International Energy Agency ECBCS Annex 40 Commissioning of Buildings and HVAC Systems for Improved Energy Performance task investigating Use of Whole Building Simulation in Commissioning has identified the following applications of whole...

  3. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  4. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  5. Flathead Basin Commission Act of 1983 (Montana)

    Broader source: Energy.gov [DOE]

    This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

  6. River Basins Advisory Commissions (South Carolina)

    Broader source: Energy.gov [DOE]

    The Catawba/Wateree and Yadkin/Pee Dee River Basins Advisory Commissions are permanent public bodies jointly established by North and South Carolina. The commissions are responsible for assessing...

  7. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  8. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  9. May 22, 2015 LAB COMMISSION MEETING MINUTES

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its ninth meeting at 9:00 AM on May 22, 2015. Commission Co-Chair Jared Cohon led the meeting. The meeting included discussion with lab directors; technology transfer coordinators; Bay area industrial partners; and site office management. The discussion was followed by an opportunity for public comment.

  10. Directory of certificiates of compliance for radioactive materials packages: Report of NRC approved packages. Revision 19, Volume 1

    SciTech Connect (OSTI)

    1996-10-01

    This directory provides information on packagings approved by the U.S. Nuclear Regulatory Commission.

  11. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-54 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct,...

  12. Review of nuclear power plant offsite power source reliability and related recommended changes to the NRC rules and regulations

    SciTech Connect (OSTI)

    Battle, R.E.; Clark, F.H.; Reddoch, T.W.

    1980-05-01

    The NRC has stated its concern about the reliability of the offsite power system as the preferred emergency source and about the possible damage to a pressurized water reactor (PWR) that could result from a rapid decay of power grid frequency. ORNL contracted with NRC to provide technical assistance to establish criteria that can be used to evaluate the offsite power system for the licensing of a nuclear power plant. The results of many of the studies for this contract are recommendations to assess and control the power grid during operation. This is because most of the NRC regulations pertaining to the offsite power system are related to the design of the power grid, and we believe that additional emphasis on monitoring the power grid operation will improve the reliability of the nuclear plant offsite power supply. 46 refs., 10 figs.

  13. Conservation of Information: Reverse engineering dark social systems

    E-Print Network [OSTI]

    2010-01-01

    NRC (Nuclear Regulatory Commission; at www.nrc.gov). SDT (gave the Nuclear Regulatory Commission the authority to

  14. Monitoring- Based Commissioning with Advanced EMIS Analysis

    E-Print Network [OSTI]

    Ratkovich, B.

    2013-01-01

    ?Based?Commissioning? with?Advanced?EMIS?Analysis Boban?Ratkovich,?MEng,?PEng,?CEM,?BESA,?LEED?AP President Presentation?Overview 1. Monitoring?Based?Commissioning?Objective? 2. Definition?of?Monitoring?Based?Commissioning?(MBCx) 3. MBCx ? Value?Added?Proposal? 4. MBCx...,?targeting?LEED?Gold ? High?performance?envelope ? BAS?integrated?lighting?with?occ? sensor?and?photocell?control ? VAV?Energy?Recovery?Ventilators? with?VFDs?and?occ?sensor?enabling ? Reversible?ASHPs?with?condensing? boiler...

  15. New Prague Utilities Commission - Commercial & Industrial Energy...

    Broader source: Energy.gov (indexed) [DOE]

    per year, per technology Program Info Sector Name Utility Administrator New Prague Utilities Commission Website http:www.SaveEnergyInNewPrague.com State Minnesota Program Type...

  16. Energy Project Development, Finance, and Commissioning Resources...

    Office of Environmental Management (EM)

    for which they were originally designed. These tests are performed during both the heating and cooling seasons. Retro-commissioning is performed on these same MEP systems in...

  17. Nuclear Regulatory Commission's Integrated Strategy for Spent...

    Office of Environmental Management (EM)

    * DOE motion to withdraw in March 2010 2 * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future 2 Growing Spent Fuel Inventory Cumulative...

  18. Demand Response Programs Oregon Public Utility Commission

    E-Print Network [OSTI]

    Demand Response Programs Oregon Public Utility Commission January 6, 2005 Mike Koszalka Director;Demand Response Results, 2004 Load Control Cool Keeper ID Irrigation Load Control Price Responsive

  19. A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19

    SciTech Connect (OSTI)

    NONE

    1998-04-01

    This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

  20. A commentary on the 1995 DOT/NRC amendments to the U.S. nuclear transportation regulations

    SciTech Connect (OSTI)

    Grella, A.

    1996-07-01

    This article discusses the major revisions (1995 DOT/NRC ammendments) to the US Nuclear Transportation regulations and their probable impacts on transportation. Areas covered include the following: the LSA and SCO definitions and packaging; radiation protection programs; mandatory use of SI units; changes an additions to the table of A1/A2 radionuclide values; and additional type B package hypothetical accident parameters.

  1. 14824 Federal Register / Vol. 74, No. 61 / Wednesday, April 1, 2009 / Notices accordance with the NRC E-filing rule,

    E-Print Network [OSTI]

    .S. Nuclear Regulatory Commission, Washington, DC 205550001. Paul B. Abramson, U.S. Nuclear Regulatory Commission, Washington, DC 205550001. Bruce R. Matthews, U.S. Nuclear Regulatory Commission, Washington, DC and Licensing Board Panel. [FR Doc. E97284 Filed 33109; 8:45 am] BILLING CODE 759001P NUCLEAR REGULATORY

  2. NRC review of Electric Power Research Institute`s advanced light water reactor utility requirements document. Passive plant designs, chapters 2-13, project number 669

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the {open_quotes}Advanced Light Water Reactor [ALWR] Utility Requirements Document{close_quotes}, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume I, {open_quotes}ALWR Policy and Summary of Top-Tier Requirements{close_quotes}, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, {open_quotes}NRC Review of Electric Power Research Institute`s Advanced Light Water Reactor Utility Requirements Document - Program Summary{close_quotes}, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff`s review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

  3. NRC review of Electric Power Research Institute`s advanced light water reactor utility requirements document. Passive plant designs, chapter 1, project number 669

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the {open_quotes}Advanced Light Water Reactor [ALWR] Utility Requirements Document{close_quotes}, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume 1, {open_quotes}ALWR Policy and Summary of Top-Tier Requirements{close_quotes}, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, {open_quotes}NRC Review of Electric Power Research Institute`s Advanced Light Water Reactor Utility Requirements Document - Program Summary{close_quotes}, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff`s review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

  4. California Energy Commission STAFF FINAL REPORT

    E-Print Network [OSTI]

    Solar Homes Partnership, Program Administration, and Program Benefits Assessment, with general comments in participating in funding opportunities provided by the EPIC program. The Energy Commission plans to begin offering opportunities for funding through EPIC after July 2013. The Energy Commission plans to utilize

  5. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    . Steven Mac and Irene Salazar provided the historic consumption data. Mark Ciminelli provided a newCalifornia Energy Commission DRAFT STAFF REPORT UPDATED CALIFORNIA ENERGY DEMAND FORECAST 20112022 MAY 2011 CEC2002011006SD #12;CALIFORNIA ENERGY COMMISSION Chris Kavalec Principal Author Chris

  6. Federal Energy Regulatory Commission January 8, 2008

    E-Print Network [OSTI]

    Laughlin, Robert B.

    energy market crisis of 2000-2001 today by approving the $18 million settlement agreement between EnronFederal Energy Regulatory Commission FACT SHEET January 8, 2008 Enron-Snohomish PUD No.1 Docket No.FERC.gov The Federal Energy Regulatory Commission took another step in resolving the issues surrounding the Western

  7. Harrods commissions new CHP station

    SciTech Connect (OSTI)

    Mullins, P.

    1994-04-01

    Three new combined heat and power (CHP) sets have recently been commissioned at Harrods, the world-famous department store in the heart of London's fashionable Knightsbridge district. The sets provide all the electricity needed by the store for lighting, heating and air-conditioning and are powered by Ruston 6RK270 turbocharged, charge-air-cooled diesel engines each producing 1392 kW at 750 r/min. These high power-to-weight ratio units were chosen in view of severe engine room space limitations. Low-grade waste heat is extracted from the engine jacket water to preheat water for three new boilers supplying some 1600 kg/h of steam for process heat to the store. The engines drive Brush BJS HW 10 100/8 alternators and are fully automatic in operation through a Regulateurs Europa control system. Some 600 sensors feed data into a Satchwell Building Management System (BMS). In the event of a breakdown, the engine control system can be switched to manual. 5 figs.

  8. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  9. LBB evaluation for a typical Japanese PWR primary loop by using the US NRC approved methods

    SciTech Connect (OSTI)

    Swamy, S.A.; Bhowmick, D.C.; Prager, D.E.

    1997-04-01

    The regulatory requirements for postulated pipe ruptures have changed significantly since the first nuclear plants were designed. The Leak-Before-Break (LBB) methodology is now accepted as a technically justifiable approach for eliminating postulation of double-ended guillotine breaks (DEGB) in high energy piping systems. The previous pipe rupture design requirements for nuclear power plant applications are responsible for all the numerous and massive pipe whip restraints and jet shields installed for each plant. This results in significant plant congestion, increased labor costs and radiation dosage for normal maintenance and inspection. Also the restraints increase the probability of interference between the piping and supporting structures during plant heatup, thereby potentially impacting overall plant reliability. The LBB approach to eliminate postulating ruptures in high energy piping systems is a significant improvement to former regulatory methodologies, and therefore, the LBB approach to design is gaining worldwide acceptance. However, the methods and criteria for LBB evaluation depend upon the policy of individual country and significant effort continues towards accomplishing uniformity on a global basis. In this paper the historical development of the U.S. LBB criteria will be traced and the results of an LBB evaluation for a typical Japanese PWR primary loop applying U.S. NRC approved methods will be presented. In addition, another approach using the Japanese LBB criteria will be shown and compared with the U.S. criteria. The comparison will be highlighted in this paper with detailed discussion.

  10. Instrumented home energy rating and commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  11. Transition from Consultation to Monitoring-NRC's Increasingly Focused Review of Factors Important to F-Area Tank Farm Facility Performance - 13153

    SciTech Connect (OSTI)

    Barr, Cynthia; Grossman, Christopher; Alexander, George; Parks, Leah; Fuhrmann, Mark; Shaffner, James; McKenney, Christepher [U.S. NRC, Rockville, MD (United States)] [U.S. NRC, Rockville, MD (United States); Pabalan, Roberto; Pickett, David [Center for Nuclear Waste Regulatory Analyses, Southwest Research Institute, San Antonio, TX (United States)] [Center for Nuclear Waste Regulatory Analyses, Southwest Research Institute, San Antonio, TX (United States); Dinwiddie, Cynthia [Southwest Research Institute, San Antonio, TX (United States)] [Southwest Research Institute, San Antonio, TX (United States)

    2013-07-01

    In consultation with the NRC, DOE issued a waste determination for the F-Area Tank Farm (FTF) facility in March 2012. The FTF consists of 22 underground tanks, each 2.8 to 4.9 million liters in capacity, used to store liquid high-level waste generated as a result of spent fuel reprocessing. The waste determination concluded stabilized waste residuals and associated tanks and auxiliary components at the time of closure are not high-level and can be disposed of as LLW. Prior to issuance of the final waste determination, during the consultation phase, NRC staff reviewed and provided comments on DOE's revision 0 and revision 1 FTF PAs that supported the waste determination and produced a technical evaluation report documenting the results of its multi-year review in October 2011. Following issuance of the waste determination, NRC began to monitor DOE disposal actions to assess compliance with the performance objectives in 10 CFR Part 61, Subpart C. To facilitate its monitoring responsibilities, NRC developed a plan to monitor DOE disposal actions. NRC staff was challenged in developing a focused monitoring plan to ensure limited resources are spent in the most cost-effective manner practical. To address this challenge, NRC prioritized monitoring areas and factors in terms of risk significance and timing. This prioritization was informed by NRC staff's review of DOE's PA documentation, independent probabilistic modeling conducted by NRC staff, and NRC-sponsored research conducted by the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX. (authors)

  12. Nuclear Regulatory Commission issuances, July 1996: Volume 44, No. 1

    SciTech Connect (OSTI)

    1996-07-01

    This report includes the issuances received during this period from NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking.

  13. Activities of Building Commissioning in Japan

    E-Print Network [OSTI]

    Yanagihara, R.

    2006-01-01

    and BackgroundIntroduction and Background #0;?#0;?#0;?#0;? Activities of Building CActivities of Building C??in Japanin Japan ?? IBEC Activity for IEA/Annex40,47IBEC Activity for IEA/Annex40,47 ?? SHASE Activity for Commissioning GuidelineSHASE Activity... ??TepcoTepcoTachikawaTachikawaBuildingBuilding ??Yamatake Research CenterYamatake Research Center ??Red Cross Medical Center Red Cross Medical Center Commissioning Map, Japan and WorldCommissioning Map, Japan and World SHASE BEMS Committee...

  14. Buildings, Commissioning, Efficiency, Comfort, and CO2

    E-Print Network [OSTI]

    Claridge, D. E.

    2006-01-01

    .6% of world CO2 emissions)? US commercial sector use ~50% of world commercial use? Asia today 10-20% of world commercial use 2055200514 7 Billion of Tons of Carbon Emitted per Year 1955 0 C Flat path Historicalemissions 1.9 ?? 2105 14 GtC/y7 GtC/y Seven..., Commissioning, Efficiency, Comfort, and CO2 Asian Pacific Building Commissioning Conference ICEBONovember 8, 2006Shenzhen, ChinaPresented ByDavid E. ClaridgeEnergy Systems LaboratoryTexas A&M University Commissioning New Buildings Beginnings Building Handover...

  15. Japanese Vision of Commissioning Process and Asian View

    E-Print Network [OSTI]

    Nakahara, N.

    2004-01-01

    Building Services Commissioning Association, BSCA, has been established in Japan as an NPO in order to propagate the building commissioning, especially HVAC commissioning, process among building and building services ...

  16. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    SciTech Connect (OSTI)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted [Nuclear Regulatory Commission (United States)

    2012-07-01

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

  17. Nuclear Regulatory Commission Sunshine Act regulations. Hearing before the Subcommittee on Energy Conservation and Power of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session, May 21, 1985

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Nuclear Regulatory Commissioners and staff and representatives of Resources for the Future, Center for the Study of Responsive Law, and the Union of Concerned Scientists testified at a hearing held in response to a changed Commission meeting format allowing secret gatherings that would not have a formal transcript or written record for later assessment. Critics of the NRC's new regulation were opposed to both the concept of secret meetings and the fact that the Commissioners approved the plan without public comment. NRC Chairman Palladino countered that the change conforms with congressional intent as interpreted by the Supreme Court in a 1984 decision involving the Sunshine Act. At issue was the intent of the commissioners and the importance of public participation in the decision making process. Additional material submitted for the record follows the testimony of 12 witnesses.

  18. Using Building Control System for Commissioning

    E-Print Network [OSTI]

    Vaezi-Nejad, H.; Salsbury, T.; Choiniere, D.

    2004-01-01

    This paper summarizes the different approaches developed during Annex 40 (research project of International Energy Agency - Energy Conservation in Buildings & Community Systems ) for carrying out commissioning activities using the control system...

  19. California Energy Commission Systems Assessment & Facilities Division

    E-Print Network [OSTI]

    North Atlantic Ocean South Atlantic Ocean North Pacific Ocean South Pacific Ocean Arctic Ocean North Pacific Ocean Indian Ocean NORTH AMERICA SOUTH AMERICA AFRICA EUROPE ASIA AUSTRAILA RUSSIA ANTARCTICA GREENLAND CENTRAL AMERICA MIDDLE EAST Southern Ocean California Energy Commission Systems

  20. California Energy Commission COMMITTEE DRAFT REPORT

    E-Print Network [OSTI]

    . Alternative and renewable transportation fuels include electricity, natural gas, biomethane, propane California Air Resources Board Tim Carmichael California Natural Gas Vehicle Coalition Brooke Coleman ENERGY COMMISSION TRANSPORTATION COMMITTEE James D. Boyd Vice-Chair Presiding Member Carla Peterman

  1. Utah Commission on Aging June 6, 2007

    E-Print Network [OSTI]

    Tipple, Brett

    Institutions Norma Matheson Chair Anne Peterson University of Utah Mayor JoAnn Seghini Midvale City Sara to the Commission for consideration. Aging SMART: Denise Brooks distributed Aging SMART Sourcebook. Website is up

  2. Control System Commissioning for Enhanced Building Operations

    E-Print Network [OSTI]

    Salsbury, T. I.; Singhal, A.

    2003-01-01

    This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems...

  3. Potential Benefits of Commissioning California Homes

    E-Print Network [OSTI]

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    California houses are improved energy utilization and reduced operating costs.Costs = Increased Funds for Other Purposes Improving the energy efficiency of Californiacosts, and environmental impacts. Energy Consumption Our evaluation of the benefits from commissioning California

  4. Delaware River Basin Commission (Multiple States)

    Broader source: Energy.gov [DOE]

    The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states...

  5. Vision of a Visualization Tool for Commissioning

    E-Print Network [OSTI]

    Isakson, P.; Eriksson, J.

    2004-01-01

    VISUALIZATION TOOL FOR COMMISSIONING Per Isakson*, Jrgen Eriksson** * Building Sciences KTH, Stockholm SWEDEN. per.isakson@byv.kth.se ** F-Installation, Gteborg, SWEDEN. jorgen.eriksson@af.se Summary. A prototype visualisation tool to display... commissioning and not the least proper operation and maintenance. Energy savings in the order of 5% to 15% may typically be realized by means of improved operation alone. This is already recognized by the industry, but several obstacles hamper a performance...

  6. Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...

    National Nuclear Security Administration (NNSA)

    Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline Atomic Energy Commission Explores Peaceful Uses of ... Atomic Energy Commission Explores Peaceful...

  7. Hawaii Department of Land and Natural Resources Commission on...

    Open Energy Info (EERE)

    Hawaii Department of Land and Natural Resources Commission on Water Resource Management Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Commission...

  8. Retro-Commissioning for State and Local Governments

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how state and local governments can lead by example by retro-commissioning their own buildings and adopting retro-commissioning policies for the private sector.

  9. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will...

  10. Department of Energy Commends the Nuclear Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit...

  11. Commission to Review the Effectiveness of the National Energy...

    Energy Savers [EERE]

    Commission to Review the Effectiveness of the National Energy Laboratories, March 24, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, March 24,...

  12. Ex Parte Meeting between DOE and California Energy Commission...

    Broader source: Energy.gov (indexed) [DOE]

    The California Energy Commission (Energy Commission) expressed concern about the differences in the stringency of California standards and the proposed DOE standards. The Energy...

  13. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the...

  14. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Office of Environmental Management (EM)

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart...

  15. Design and Commissioning of a Wind Tunnel for Integrated Physical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commissioning of a Wind Tunnel for Integrated Physical and Chemical Measurements of PM Dispersing Plume of Heavy Duty Diesel Truck Design and Commissioning of a Wind Tunnel for...

  16. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans

    SciTech Connect (OSTI)

    LePoire, D.; Arnish, J.; Cheng, J.J.; Kamboj, S.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2007-07-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include 1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and 2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting final status surveys are addressed in the WBT. Realistic case examples are presented and analyzed including the abstraction of a realistic site into a conceptual model and computer model. A case history is also used to demonstrate development of NRC review documents such as requests for additional information (RAIs). To enhance the web-based training experience, audio, animations, linked documents, quizzes, and scripts are being integrated with a commercial web-based training package that supports simple navigation. The course is also being integrated into both existing and state-of-the-art learning management systems. A testing group is being utilized to identify and help resolve training issues prior to deployment of the course. When completed, the course can be accessed for credited training with required modules dependent on the job category of the training participant. The modules will also be accessible to NRC staff for review or refresher following initial course completion. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT will provide reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling will promote staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities. (authors)

  17. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans.

    SciTech Connect (OSTI)

    LePoire, D.; Arnish, J.; Cheng, J. J.; Kamboj, S.; Richmond, P.; Chen, S. Y.; Barr, C.; McKenney, C.; Environmental Science Division; NRC

    2007-01-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include: (1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and (2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting final status surveys are addressed in the WBT. Realistic case examples are presented and analyzed including the abstraction of a realistic site into a conceptual model and computer model. A case history is also used to demonstrate development of NRC review documents such as requests for additional information (RAIs). To enhance the web-based training experience, audio, animations, linked documents, quizzes, and scripts are being integrated with a commercial web-based training package that supports simple navigation. The course is also being integrated into both existing and state-of-the-art learning management systems. A testing group is being utilized to identify and help resolve training issues prior to deployment of the course. When completed, the course can be accessed for credited training with required modules dependent on the job category of the training participant. The modules will also be accessible to NRC staff for review or refresher following initial course completion. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT provides reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling promotes staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities.

  18. U.S. NRC CONFIRMATORY LEVEL 1 PRA SUCCESS CRITERIA ACTIVITIES

    SciTech Connect (OSTI)

    Donald Helton; Hossein Esmaili; Robert Buell

    2011-03-01

    The U.S. Nuclear Regulatory Commissions standardized plant analysis risk (SPAR) models are used to support a number of risk-informed initiatives. The fidelity and realism of these models are ensured through a number of processes including cross-comparison with industry models, review and use by a wide range of technical experts, and confirmatory analysis. This paper will describe a key activity in the latter arena. Specifically, this paper will describe MELCOR analyses performed to augment the technical basis for confirming or modifying specific success criteria of interest. The analyses that will be summarized provide the basis for confirming or changing success criteria in a specific 3-loop pressurized-water reactor and a Mark-I boiling-water reactor. Initiators that have been analyzed include loss-of-coolant accidents, loss of main feedwater, spontaneous steam generator tube rupture, inadvertent opening of a relief valve at power, and station blackout. For each initiator, specific aspects of the accident evolution are investigated via a targeted set of calculations (3 to 22 distinct accident analyses per initiator). Further evaluation is ongoing to extend the analyses conclusions to similar plants (where appropriate), with consideration of design and modeling differences on a scenario-by-scenario basis. This paper will also describe future plans.

  19. T:\\P roj ects\\CEC \\NG_ Utility S ervice T erri tories\\ Web m aps\\NG S ervice Area_W eb _ A siz e.m xd 0 50 10025 Miles

    E-Print Network [OSTI]

    & Oil City of Vernon Southwest Gas Sacramento Tuscarora T:\\P roj ects\\CEC \\NG_ Utility S ervice T erri tories\\ Web m aps\\NG S ervice Area_W eb _ A siz e.m xd 0 50 10025 Miles O California Natural Gas Detailed

  20. Commissioning in a LEED & GOBAS Evaluated Green Building

    E-Print Network [OSTI]

    Zhang, Y.

    2006-01-01

    scheme ???????? ?????????????? ???????? Special interests Special interests ??energy audit and assessmentenergy audit and assessment Commissioning in an Evaluated Green BuildingCommissioning in an Evaluated Green Building 99 ???? Method....620.20.487.2811.5463.1 Commissioning in an Evaluated Green BuildingCommissioning in an Evaluated Green Building 1717 ?????????????????????? Enthalpy Wheel for Heat RecoveryEnthalpy Wheel for Heat Recovery ???????? ???????????????????? ???????? Well designed, imported from Sweden...

  1. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  2. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  3. Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission

    E-Print Network [OSTI]

    Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street MS-2000 Sacramento, CA 95814 Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section

  4. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission

    E-Print Network [OSTI]

    NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section

  5. The Public Lands Commission of 1879

    E-Print Network [OSTI]

    Odom, Danna Evelyn

    1971-01-01

    primary sources for a study of' the Public Lands Commission of i879 are the 2 1 ' rl ~Rt (46 Cong. , 2 . , Ron Rxee tt Document 06), and Thomas Donaldson's The Public Domain. Important background material for the formation of the commission... is provided. by A Letter from the ~Actin Presi- 6* t 8 th Nt' 1~Ad. f S ' ~7?'tt' sess. , House Miscellaneous Document 5), and by the ~Re ort on the Lands of the Arid ~Re ion of the United. States with a Kore Detailecl Account of the Lands of Utah, by John...

  6. Texas Facilities Commission's Facility Management Strategic Plan

    E-Print Network [OSTI]

    Ramirez, J. A.

    2009-01-01

    stream_source_info ESL-IC-09-11-12.pdf.txt stream_content_type text/plain stream_size 4735 Content-Encoding ISO-8859-1 stream_name ESL-IC-09-11-12.pdf.txt Content-Type text/plain; charset=ISO-8859-1 Texas Facilities... Commission?s Facility Management Strategic Plan Jorge A. Ramirez Deputy Executive Director Building Operations & Plant Management ESL-IC-09-11-12 Proceedings of the Ninth International Conference for Enhanced Building Operations, Austin, Texas, November 17...

  7. THE NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1 1; -.ll 1q 3 THE/NRC HAS

  8. Microsoft PowerPoint - 12_BRIAN_HORN_NRC and DOE recognition May 13 2014.ppt [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) AugustA. -71-3 Recognitions Brian Horn, NRC Pete

  9. The Decline and Death of Nuclear Power

    E-Print Network [OSTI]

    Melville, Jonathan

    2013-01-01

    United States Nuclear Regulatory Commission (2012). NRC:United States Nuclear Regulatory Commission (2013). NRC: Newreasons that the Nuclear Regulatory Commission was founded

  10. GUYANA FORESTRY COMMISSION NATIONAL WOOD TRACKING SYSTEM

    E-Print Network [OSTI]

    Timber Sales Agreement VPA Voluntary Partnership Agreement WCL Wood Cutting Lease WTS Wood Tracking chain is managed and controlled the Guyana Forestry Commission has developed a Wood Tracking System (WTS in the process as well as flow charts illustrating essential elements of the system. The WTS links closely

  11. The Research Agency of the Forestry Commission

    E-Print Network [OSTI]

    of the afforested peat resource in Wales, and the biodiversity, greenhouse gas flux and hydrological implications,038 ha of the afforested blanket bog and deep peat resource which are managed by Forestry Commission an improved distribution map of the upland blanket peat and deep peat soils resource at the highest resolution

  12. Potential Benefits of Commissioning California Homes

    E-Print Network [OSTI]

    This work was supported by the Assistant Secretary for Energy Efficiency and Renewable Energy, OfficeLBNL-48258 Potential Benefits of Commissioning California Homes Nance Matson, Craig Wray, Iain Walker, Max Sherman Environmental Energy Technologies Division Energy Performance of Buildings Group

  13. FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

    E-Print Network [OSTI]

    Bove Jr., V. Michael

    FCC 96207 Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of a mechanism for a bit stream layer transmission standard (into which, e.g., MPEG2 could fit) 3) The FCC: number of hours per day of digital television transmission, minimal Quality of Service specifications

  14. COMMISSION GUIDEBOOK NEW SOLAR HOMES PARTNERSHIP

    E-Print Network [OSTI]

    Partnership provides financial incentives for installing solar energy systems on new residential buildings for solar homes that incorporate high levels of energy efficiency and highperforming solar energy systems, Energy Commission, PV, solar energy system, energy efficiency, standards, Title 24 Part 6, tier

  15. FORESTRY COMMISSION NATIONAL OFFICE FOR SCOTLAND

    E-Print Network [OSTI]

    or even a change of ownership need not alter the course of management. Response to natural `events' can be accommodated, as can changes in resources available. What is a Management Plan? Essentially, a management planFORESTRY COMMISSION NATIONAL OFFICE FOR SCOTLAND GUIDANCE NOTE NO 12 MANAGEMENT PLANS FOR SEMI

  16. Instrumented Home Energy Rating and Commissioning

    E-Print Network [OSTI]

    Secretary for Energy Efficiency and Renewable Energy, Building Technologies Program, of the U.S. DepartmentLBNL-52216 Instrumented Home Energy Rating and Commissioning Craig Wray, Iain Walker, Max Sherman Environmental Energy Technologies Division Indoor Environment Department Lawrence Berkeley National Laboratory

  17. TRANSIT COMMISSION MINUTES February 6, 2013

    E-Print Network [OSTI]

    with the engineering student who is working on his research project today to work out how he is doing his research. Ridership There was discussion about the overall trend of ridership shifting between routes, and upgrading the dispatch software. Finally, Sweeten informed the commission that he is implementing a new

  18. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    i LBP-09-10 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING Nuclear Power Plant, Units 1 and 2) Docket No. 52-029-COL, 52-030-COL ASLBP No. 09-879-04-COL-BD01 July 8

  19. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    LBP-09-04 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of CALVERT CLIFFS 3 NUCLEAR PROJECT, LLC, and UNISTAR NUCLEAR OPERATING SERVICES, LLC (Combined This case arises from an application by UniStar Nuclear Operating Services, LLC and Calvert Cliffs 3 Nuclear

  20. Distributed Energy System Validation, Commissioning and

    E-Print Network [OSTI]

    Distributed Energy System Validation, Commissioning and Qualification Test Report Prepared Agreement No. DE-FC26-06NT42847 Hawai`i Distributed Energy Resource Technologies for Energy Security Subtask for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative

  1. Commissioning to Meet Space Qualification Criteria vs. Energy Consumption Optimization Focused Commissioning

    E-Print Network [OSTI]

    Sellers, D.; Irvine, L.

    2001-01-01

    In many cases, the commissioning process is driven by space quality criteria rather than by energy consumption and optimization criteria. This is especially true for the HVAC systems serving clean rooms in the semi-conductor and pharmaceuticals...

  2. METHODOLOGIES FOR REVIEW OF THE HEALTH AND SAFETY ASPECTS OF PROPOSED NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL SITES AND FACILITIES. VOLUME 9 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA

    E-Print Network [OSTI]

    Nero, A.V.

    2010-01-01

    No. 73-900, 1973. Nuclear Regulatory Commission, Regula toryJan. 1, 1977. Nuclear Regulatory Commission, Regulatorywith the Nuclear Regulatory Commission,will have a decided

  3. Commissioning, Operation, Real Time Monitoring and Evaluation of Pilot: Achieving Optimal Performance through Building Commissioning

    E-Print Network [OSTI]

    Pang,X.; Piette, M.A.; Hao,B.

    2014-01-01

    CONSORTIUM U.S. - CHINA CLEAN ENERGY RESEARCH CENTER (CERC-BEE) E3: Commissioning, Operation, Real Time Monitoring and Evaluation of Pilot Achieving Optimal Performance through Building Commissioning Xiufeng Pang, Mary Ann Piette, Bin Hao Interface... to demo projects to ensure that the CERC-BEE demonstrated technologies work properly and are integrated with the rest of the building systems Review the Cx plans for the two demo projects, the CABR building and the Xingye building. Develop optimal...

  4. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect (OSTI)

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJITs Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: Online classes are self-paced, and can be completed anywhere, any time Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual lessons, followed by a 24 hour hands-on lab. Total time required is between 50 and 70 hours, depending on the pace of the independent learner. Individual courses can be taken for continuing education credits. Assessments are included for each course, and a score of at least 80% is required for completion. Completion of Modules 1 through 3 is prerequisite for participating in the laboratory. More experienced participants have the option to test out of Modules 1 and 2 and complete Module 3 to progress to the laboratory.

  5. A History of the Atomic Energy Commission

    SciTech Connect (OSTI)

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  6. Ethylene plant commissioned at Corpus Christi

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    Ethylene Plant Commissioned at Corpus Christi. Corpus Christi Petrochemical Co. has commissioned its $600 million ethylene plant at Corpus Christi, Tex. Plant capacities include 1.2 billion lb/yr of ethylene, 560 million lb/yr of propylene, 400 million lb/yr of crude butadiene mixture, 60 million gal of benzene, 45 million gal of gasoline blending components, and 50 million gal of fuel oils. The ethylene and propylene will be transported by pipeline to Houston for further processing. At the Corpus Christi facilities, process pressures range from full vacuum to 1800 psig, and process temperatures range from -260/sup 0/ to +1600/sup 0/F. The plant uses gas oil and naphtha as feedstock, but also has some flexibility to use ethane or LPG as feedstock. Stone and Webster Engineering Corp. engineered and Brown and Root Inc. built the plant.

  7. The IEA/ECBCS/Annex 40 Glossary on Commissioning

    E-Print Network [OSTI]

    Akashi, Y.; Castro, N.; Novakovic, V.; Viaud, B.; Jandon, M.

    2004-01-01

    International Energy Agency's (IEA) Energy Conservation in Building and Community Systems' (ECBCS) Annex 40 has developed a glossary of commissioning terms as one of the first commissioning tools produced within the annex. The glossary consists...

  8. Ontology Development for Low-Energy Building Embedded Commissioning

    E-Print Network [OSTI]

    Lee, K. J.; Akin, O.; Akinci, B.; Garrett, J.; Bushby, S.

    2009-01-01

    building commissioning process models, we found that there is a need to categorize and classify information items, which are available in commissioning process descriptions. In addition, the relationship between these items should be clearly defined...

  9. Roanoke River Basin Bi-State Commission (Multiple States)

    Broader source: Energy.gov [DOE]

    The Roanoke River Basin Bi-State Commission was established as a bi-state commission composed of members from the Commonwealth of Virginia and the State of North Carolina.The purpose of the...

  10. COMMISSIONING OF THE RELATIVISTIC HEAVY ION COLLIDER.

    SciTech Connect (OSTI)

    TRBOJEVIC,D.; AHRENS,L.; BLASKIEWICZ,M.; BRENNAN,M.; BAI,M.; CAMERON,P.; CARDONA,J.; CONNOLLY,R.; ET AL; TSOUPAS,N.; VAN ZEIJTS,J.

    2001-06-18

    This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supplies connections by the beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results; like Schottky detector, beam profile monitor, beam position monitors, tune meter and others, are shown [1].

  11. CALIFORNIA ENERGY COMMISSION NEW CONSTRUCTION ENERGY AUDITS

    E-Print Network [OSTI]

    RENOVATION CALIFORNIA ENERGY COMMISSION NEW CONSTRUCTION ENERGY AUDITS F O R T E C H N I C A L A S S I S TA N C E ENERGY EFFICIENCY All public or non-profit K12 schools are eligible for assistance www.energy.ca.gov/efficiency/brightschools Call: (916) 654-4147 LOWER ENERGY COSTS AND IMPROVED LEARNING ENVIRONMENTS = Publication No. P400

  12. December 15, 2014 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its fifth meeting at 10:00 AM on December 15, 2014. Commission Co-Chair Jared Cohon led the meeting. The meeting included two panels: (1) authors of recent reports about the DOE National Labs and (2) a national lab contractor panel. The report authors summarized their respective reports, highlighting concerns related to the relationship between DOE and the labs, research funding and strategy stove-piping, weak links between the labs and market, an inconsistent economic development mission, the difficulty small firms have in accessing labs, the labs lack of regional engagement, and DOE and congressional micromanagement of the labs. The lab contractor representatives responded to questions posed by the commissioners related to lab management and the relationship with DOE. Additionally, Patricia Falcone spoke of the important role of the labs in the science and technology enterprise and Alan Leshner talked about the labs and their relationship with the scientific community. Christopher Paine presented his views on transforming the weapons complex. The next meeting will be held February 24 at the Hilton at Mark Center in VA.

  13. The Commission Forecast 1992 Report: Important Resource Planning Issues

    E-Print Network [OSTI]

    Adib, P.

    1992-01-01

    FORECAST 1992 REPORT: IMPORTANT RESOURCE PLANNING ISSUES PARVIZ ADIB MANAGER, ECONOMIC ANALYSIS SECTION ELECTRIC DIVISION PUBLIC UTILITY COMMISSION OF TEXAS ABSTRACT There is a general agreement among experts in the electric utility industry... there are many important issues in the preparation of a utility's electric resource plan, the Commission staff will address a few important ones in the next Commission Forecast Report (Forecast '92). In particular, the Commission staff will insure...

  14. Atomic Energy Commission : Atomic Power at Shippingport - 1958 Educational Film

    SciTech Connect (OSTI)

    2013-02-02

    The United States Atomic Energy Commission & Westinghouse Electric Company take us on a tour of an atomic power station.

  15. US Nuclear Regulatory Commission functional organization charts, January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  16. California Energy Commission Technical Assistance for the Alternative and

    E-Print Network [OSTI]

    California Energy Commission 1 Technical Assistance for the Alternative and Renewable Fuel and Vehicle Technology (ARFVT) Program California Energy Commission Request for Proposals RFP # 600-12-604 Pre-Bid Conference Date: January 23, 2013 #12;California Energy Commission AGENDA 10:00 Welcome and Introductions

  17. California Energy Commission Alternative and Renewable Fuel and Vehicle Technology

    E-Print Network [OSTI]

    California Energy Commission Alternative and Renewable Fuel and Vehicle Technology Program Advisory, Statutes of 2007) created the Alternative and Renewable Fuel and Vehicle Technology Program (hereinafter "Program") to be administered by the California Energy Commission (Energy Commission).1 AB 118 authorizes

  18. Page 1 of 3 South Carolina Commission on Higher Education

    E-Print Network [OSTI]

    Kunkle, Tom

    Page 1 of 3 South Carolina Commission on Higher Education Nonpublic Postsecondary Institution the South Carolina Commission on Higher Education. The school director will provide the students with the necessary form. #12;Page 3 of 3 South Carolina Commission on Higher Education Nonpublic Postsecondary

  19. Commissioner Catherine J.K. Sandoval California Public Utilities Commission

    E-Print Network [OSTI]

    Stoltz, Brian M.

    Commissioner Catherine J.K. Sandoval California Public Utilities Commission Caltech April 2, 2014 by Constitutional Amendment as the Railroad Commission. In 1912, the Legislature passed the Public Utilities Act Utilities Commission. CPUC regulates Investor-Owned Utilities that provide: Electricity Gas

  20. Practical Diagnostics for Evaluating Residential Commissioning Metrics

    SciTech Connect (OSTI)

    Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

    2002-06-11

    In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

  1. The Environmental Protection Agency's Safety Standards for Disposal of Spent Nuclear Fuel: Potential Path Forward in Response to the Report of the Blue Ribbon Commission on America's Nuclear Future - 13388

    SciTech Connect (OSTI)

    Forinash, Betsy; Schultheisz, Daniel; Peake, Tom

    2013-07-01

    Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generally applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)

  2. Hybrid Simulation of the Seismic Response of Squat Reinforced Concrete Shear Walls

    E-Print Network [OSTI]

    Whyte, Catherine Alexandra

    2012-01-01

    in 1980 when the Nuclear Regulatory Commissions Office ofthis site from the Nuclear Regulatory Commission (NRC). They

  3. Confortable Performance: Retro-Commissioning Building Operations

    E-Print Network [OSTI]

    Botan, L.

    2013-01-01

    Operations, Montreal, Quebec, October 8-11, 2013 Tools ? Actuator and system testing ? Sensor Calibration ? Use of Building Automation System trends ? Use of data-loggers 9 ESL-IC-13-10-07a Proceedings of the 13th International Conference for Enhanced... Performance Retro-Commissioning Building Operations Liviu Craiu-Botan, P.Eng. CB Consulting Toronto 1 ESL-IC-13-10-07a Proceedings of the 13th International Conference for Enhanced Building Operations, Montreal, Quebec, October 8-11, 2013 Building...

  4. School Energy Management Through Continuous Commissioning

    E-Print Network [OSTI]

    Watt, J.

    2012-01-01

    .00+ per square foot or more (depends on complexity, repair costs, etc.) ? Typical Cost savings when viable candidate is chosen: 15-25% of annual energy cost (more or less, depends on building type and usage) ? The above combination usually results... results in about 1-5% (2.5% on average) increase per year of the originally Cx?d building?s energy consumption? 5 Commissioning | NEW BUILDING ? EXISTING BUILDING That new-building smell is gone, replaced by? well you know. Assuming originally Cx...

  5. National Energy Commission (China) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to: navigation,Naples,Development and ReformCommission

  6. Texas Historical Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJ Automation JumpSetIdaho: Energy ResourcesTexasHistorical Commission

  7. Utah Labor Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJThin FilmUnited States:UserLabor Commission Jump to: navigation,

  8. Utah Public Service Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJThin FilmUnited States:UserLabor Commission Jump to:

  9. California Coastal Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County, California: Energy ResourcesCRED:Calendar Home2015EnergyCommission

  10. The Atomic Energy Commission By Alice Buck

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyThe U.S.Laclede GasEfficiency MaineAuto industry workers retrain(EAP) Commission By

  11. New Mexico Preservation Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII Jump to: navigation,NationalJersey/Incentives < New JerseyHydrogenCommission

  12. LINE Commission Visits Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource and JobLCLS Operating3ledp/ The4, LINE Commission

  13. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 18

    SciTech Connect (OSTI)

    NONE

    1995-07-23

    This document (NUREG-0325) is the current US NRC organization chart, listing all NRC offices and regions and their components down through the branch level as of July 23, 1995. Functional statements of each position are given, as is the name of the individual holding the position.

  14. MINER{nu}A Test Beam Commissioning

    SciTech Connect (OSTI)

    Higuera, A.; Castorena, J.; Urrutia, Z.; Felix, J.; Zavala, G.

    2009-12-17

    MINER{nu}A Main INjector ExpeRiment {nu}-A is a high-statistic neutrino scattering experiment that will ran in the NuMI Beam Hall at Fermilab. To calibrate the energy response of the MINER{nu}A detector, a beamline is being designed for the MINER{nu}A Test Beam Detector (TBD). The TBD is a replica of the full MINER{nu}A detector at small scale for calibration studies of the main detector. The beamline design consists of the following parts: a copper target, used to generate tertiaries from an incoming secondary beam; a steel collimator for tertiaries, which also serves as a dump for the incoming beam; a time of fight system (scintillator planes); four wire chambers, for angle measurements and tracking; and two dipole magnets, used as an spectrometer. During last October, the first commissioning run of the MINER{nu}A Test Beam took place in the Meson Test Beam Facility at Fermilab. We commissioned the target and collimator of the new tertiary beamline.

  15. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission

    E-Print Network [OSTI]

    NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section oilfield for use in enhanced oil recovery. Modification Description: Modify air quality conditions AQ-17

  16. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2010, Prepared for the Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, May 2012

    SciTech Connect (OSTI)

    D. E. Lewis D. A. Hagemeyer Y. U. McCormick

    2012-07-07

    This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commissions (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2010 annual reports submitted by five of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Because there are no geologic repositories for high-level waste currently licensed and no NRC-licensed low-level waste disposal facilities currently in operation, only five categories will be considered in this report. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Annual reports for 2010 were received from a total of 190 NRC licensees. The summation of reports submitted by the 190 licensees indicated that 192,424 individuals were monitored, 81,961 of whom received a measurable dose. When adjusted for transient workers who worked at more than one licensee during the year, there were actually 142,471 monitored individuals and 62,782 who received a measurable dose. The collective dose incurred by these individuals was 10,617 person-rem, which represents a 12% decrease from the 2009 value. This decrease was primarily due to the decrease in collective dose at commercial nuclear power reactors, as well as a decrease in the collective dose for most of the other categories of NRC licensees. The number of individuals receiving a measurable dose also decreased, resulting in an average measurable dose of 0.13 rem for 2010. The average measurable dose is defined as the total effective dose equivalent (TEDE) divided by the number of individuals receiving a measurable dose. In calendar year 2010, the average annual collective dose per reactor for light water reactor (LWR) licensees was 83 person-rem. This represents a 14% decrease from the value reported for 2009 (96 person-rem). The decrease in collective dose for commercial nuclear power reactors was due to an 11% decrease in total outage hours in 2010. During outages, activities involving increased radiation exposure such as refueling and maintenance are performed while the reactor is not in operation. The average annual collective dose per reactor for boiling water reactors (BWRs) was 137 personrem for 35 BWRs, and 55 person-rem for 69 pressurized water reactors (PWRs). Analyses of transient individual data indicate that 29,333 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient individuals by multiple licensees. The adjustment to account for transient individuals has been specifically noted in footnotes in the figures and tables for commercial nuclear power reactors. In 2010, the average measurable dose per individual for all licensees calculated from reported data was 0.13 rem. Although the average measurable dose per individual from data submitted by licensees was 0.13 rem, a corrected dose distribution resulted in an average measurable dose per individual of 0.17 rem.

  17. INITIAL COMMISSIONING OF NDCX-II

    SciTech Connect (OSTI)

    Lidia, S.; Arbelaez, D.; Greenway, W.; Jung, J. -Y.; Kwan, J.; Lipton, T.; Pekedis, A.; Roy, P.; Seidl, P.; Takakuwa, J.; Waldron, W.; Friedman, A.; Grote, D.; Sharp, W.; Gilson, E.

    2012-05-15

    The Neutralized Drift Compression Experiment-II (NDCX-II) will generate ion beam pulses for studies of Warm Dense Matter and heavy-ion-driven Inertial Fusion Energy. The machine will accelerate 20-50 nC of Li+ to 1.2-3 MeV energy, starting from a 10.9-cm alumino-silicate ion source. At the end of the accelerator the ions are focused to a sub-mm spot size onto a thin foil (planar) target. The pulse duration is compressed from ~;;500 ns at the source to sub-ns at the target following beam transport in a neutralizing plasma. We first describe the injector, accelerator, transport, final focus and diagnostic facilities. We then report on the results of early commissioning studies that characterize beam quality and beam transport, acceleration waveform shaping and beam current evolution. We present simulation results to benchmark against the experimental measurements.

  18. Richard Lazarus Named as Executive Director of National Commission...

    Energy Savers [EERE]

    Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Richard Lazarus Named as Executive Director of National...

  19. Sandia Energy - Sandia-AREVA Commission Solar Thermal/Molten...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia-AREVA Commission Solar ThermalMolten Salt Energy-Storage Demonstration Home Renewable Energy Energy Facilities Partnership Capabilities News SunShot News & Events...

  20. Memorandum on the Interim Report of the Commission to Review...

    Energy Savers [EERE]

    on the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories The SEAB Task Force on DOE National Laboratories was established by...

  1. Retro-Commissioning for Regulators of Ratepayer-Funded Programs

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how customer usage data can help promote the adoption of retro-commissioning polices for public and private commercial buildings.

  2. Idaho Public Utilities Commission Approves Neal Hot Springs Power...

    Open Energy Info (EERE)

    Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Idaho Public...

  3. Including Retro-Commissioning in Federal Energy Savings Performance...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Including Retro-Commissioning in Federal Energy Savings Performance Contracts Enabling Mass-Scale Financing for Federal Energy, Water, and...

  4. Results and commissioning issues from an automated demand response pilot

    E-Print Network [OSTI]

    Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

    2004-01-01

    of Fully Automated Demand Response in Large Facilities"Management and Demand Response in Commercial Buildings", L Band Commissioning Issues from an Automated Demand Response.

  5. Chapter 9 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    of the Wyoming Public Service Commission Regulations: General Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  6. Chapter 2 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    Chapter 2 of the Wyoming Public Service Commission Regulations: General Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  7. Guidelines and Checklist for Commissioning and Government Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Contract Clauses for Government Acceptance of ESPC Projects Commissioning Guidance for ESPCs Study Guide for Photovoltaic System Installers and Sample Examination Questions...

  8. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Blue Ribbon Commission Report and Transportation Program Corinne Macaluso National Transportation Stakeholders Forum Knoxville, Tennessee May 16, 2012 2 Formed at the direction...

  9. Automated Proactive Techniques for Commissioning Air-Handling Units

    SciTech Connect (OSTI)

    Katipamula, Srinivas ); Brambley, Michael R. ); Luskay, Larry

    2003-08-30

    Many buildings today use sophisticated building automation systems (BASs) to manage a wide and varied range of building systems. Although the capabilities of the BASs seem to have increased over time, many buildings still are not properly commissioned, operated or maintained. Lack of or improper commissioning, the inability of the building operators to grasp the complex controls, and lack of proper maintenance leads to inefficient operations and reduced lifetimes of the equipment. If regularly scheduled manual maintenance or re-commissioning practices are adopted, they can be expensive and time consuming. Automated proactive commissioning and diagnostic technologies address two of the main barriers to commissioning: cost and schedules. Automated proactive continuous commissioning tools can reduce both the cost and time associated with commissioning, as well as enhance the persistence of commissioning fixes. In the long run, automation even offers the potential for automatically correcting problems by reconfiguring controls or changing control algorithms dynamically. This paper will discuss procedures and processes that can be used to automate and continuously commission the economizer operation and outdoor-air ventilation systems of an air-handling unit.

  10. Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

    SciTech Connect (OSTI)

    Tom Elicson; Bentley Harwood; Richard Yorg; Heather Lucek; Jim Bouchard; Ray Jukkola; Duan Phan

    2011-03-01

    The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it would have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.

  11. Building geothermal research and development partnerships: The California Energy Commission`s geothermal program

    SciTech Connect (OSTI)

    Hare, R.; Tiangco, V.; Birkinshaw, K.; Johannis, M.

    1995-12-31

    The California Energy Commission`s Geothermal Program (Assembly Bill 1905, Bosco) has built cost-shared Research, Development and Demonstration (RD&D) partnerships with over 150 public and private entities. The Geothermal Program promotes the development of new geothermal resources and technologies for both direct-use and electricity generation while protecting the environment and promoting energy independence. This is accomplished by providing financial and technical assistance in the form of contingent awards which, depending on project success, can become either a loan or a grant. Some of the cost-shared RD&D accomplishments are presented. The process and requirements to obtain financial assistance through the Geothermal Program are summarized.

  12. Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  13. U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

    SciTech Connect (OSTI)

    Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

    2010-12-01

    For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

  14. Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

    SciTech Connect (OSTI)

    Devgun, Jas S. [Nuclear Power Technologies, Sargent and Lundy LLC1, Chicago, IL (United States)] [Nuclear Power Technologies, Sargent and Lundy LLC1, Chicago, IL (United States)

    2013-07-01

    Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

  15. Risd-M-1591 jo Danish Atomic Energy Commission

    E-Print Network [OSTI]

    March 1973 R-5-73 Available on raqvaat from: Library of the Danish Atomic Enorgy Commission (Aton on request from the Library of the Danish Atomic Energy Commission (Atomenergikommissionens Bibliotek), Ris Section I Situation Today Section II Important Trends and Developments 13 Section III Developments

  16. California Energy Commission Alternative and Renewable Fuel and Vehicle Technology

    E-Print Network [OSTI]

    California Energy Commission Alternative and Renewable Fuel and Vehicle Technology Program Advisory by the Energy Commission. Under the Program, the following shall be eligible for funding: 3 Alternative, Statutes of 2007) created the Alternative and Renewable Fuel and Vehicle Technology Program (hereinafter

  17. California Energy Commission www.energy.ca.gov

    E-Print Network [OSTI]

    California Energy Commission www.energy.ca.gov TECHNICAL ASSISTANCE TO PUBLIC AGENCIES Request Program o Energy Partnership Technical Assistance Program o Energy Conservation Assistance Act (ECAA) Loan Program RFQ Overview How to Respond to this RFQ Questions and Answers California Energy Commission

  18. U.S. NUCLEAR REGULATORY COMMISSION Revision 1 February 1996

    E-Print Network [OSTI]

    Johnson, Eric E.

    U.S. NUCLEAR REGULATORY COMMISSION Revision 1 February 1996 REGULATORY GUIDE OFFICE OF NUCLEAR, ADM, U.S. Nuclear Regulatory Commission, Washing- ton, DC 20555-0001. The guides ar REGULATORY RESEARCH REGULATORY GUIDE 8.29 (Draft was issued as DG-8012) INSTRUCTION CONCERNING RISKS FROM

  19. COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 28.6.2006

    E-Print Network [OSTI]

    programme of the European Atomic Energy Community (Euratom) for nuclear research and training activities Energy Community (Euratom) for nuclear research and training activities (2007 to 2011)1 . The CommissionEN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 28.6.2006 COM(2006) 364 final 2005/0043(COD

  20. Commission on the Future of the University Introduction

    E-Print Network [OSTI]

    Huang, Wei

    their individual school plans to integrate emerging strategies developed by the Commission. Final school plans. The Commission will produce a final report before the end of the 2007 fall semester for the President's review dean will produce a three-page executive summary that outlines two-, six-, and ten-year plans for her

  1. HYTEST Phase I Facility Commissioning and Modeling

    SciTech Connect (OSTI)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  2. AEgIS experiment commissioning at CERN

    SciTech Connect (OSTI)

    Krasnicky, D.; Aghion, S.; Amsler, C.; Ariga, A.; Ariga, T.; Ereditato, A.; Kawada, J.; Kimura, M.; Pistillo, C.; Scampoli, P.; Storey, J.; Belov, A. S.; Gninenko, S. N.; Bonomi, G.; Subieta Vasquez, M. A.; Braeunig, P.; Oberthaler, M. K.; Brusa, R. S.; Di Noto, L.; Mariazzi, S.; and others

    2013-03-19

    The AEgIS Experiment is an international collaboration based at CERN whose aim is to perform the first direct measurement of the gravitational acceleration g of antihydrogen in the gravitational field of the Earth. Cold antihydrogen will be produced with a pulsed charge exchange reaction in a cylindrical Penning trap where antiprotons will be cooled to 100mK. The cold antihydrogen will be produced in an excited Rydberg state and subsequently formed into a beam. The deflection of the antihydrogen beam will be measured by using Moire deflectometer gratings. After being approved in late 2008, AEgIS started taking data in a commissioning phase early 2012. This report presents an overview of the AEgIS experiment, describes its current status and shows the first measurements on antiproton catching and cooling in the 5 T Penning catching trap. We will also present details on the techniques needed for the 100mK antihydrogen production, such as pulsed positronium production and its excitation with lasers.

  3. DESIGN-PHASE COMMISSIONING This procedure defines the process for performing design-phase commissioning (Cx) on new

    E-Print Network [OSTI]

    Kamat, Vineet R.

    -phase commissioning (Cx) on new building, building addition and building renovation projects. When performed-phase Cx is a process by which a building Commissioning Authority (CxA) assists the U-M Design Manager Manager, but the CxA shall provide the Design Manager with recommendations on the MEP design to assure

  4. Directory of Certificates of Compliance for radioactive materials packages: Report of NRC approved packages. Volume 1, Revision 18

    SciTech Connect (OSTI)

    1995-10-01

    The purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volumes 1 and 2. An alphabetical listing by user name is included in the back of Volume 3 of approved QA programs. The reports include a listing of all users of each package design and approved QA programs prior to the publication date.

  5. NRC Form 741

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) AugustA.MOXAdministrationOfficialsA 1 1 1 1

  6. Commissioning of Building HVAC Systems for Improved Energy Performance: A Summary of Annex 40 Results

    E-Print Network [OSTI]

    Visier, J. C.

    2004-01-01

    main achievements. These achievements can be split in 4 categories: 1) tools to manage the commissioning process, 2) manual commissioning tools, 3) approaches to use building energy management system to assist in building commissioning, 4) approaches...

  7. Status of the Commissioning of SOLEIL

    SciTech Connect (OSTI)

    Filhol, J. M.; Couprie, M. E.; Level, M. P.; Besson, J. C.; Brunelle, P.; Denard, J. C.; Godefroy, J. M.; Herbeaux, C.; Lebasque, P.; Le Roux, V.; Lestrade, A.; Loulergue, A.; Marchand, P.; Nadji, A.; Nadolski, L.; Nagaoka, R.; Pottin, B.; Tordeux, M. A.

    2007-01-19

    SOLEIL is a third generation Synchrotron radiation Source, under construction in France at St Aubin, near Paris. The Storage Ring consists in a 357 m circumference ring, with 16 cells and 24 straight sections (4x12m, 12x7m, 8x3.6m), out of which up to 21 will house insertion devices. The optics, with distributed dispersion, features a low 3.7 nm.rad emittance at the 2.75 GeV operating energy, so as to provide high brilliance, from the VUV up to the hard X ray domain. In order to provide a long lifetime, and beam position stabilities in the micron range, significant attention was paid at each design stage (optics, magnets, beam position monitors, vacuum and RF systems,..), including the design of the building and infrastructure, the construction of which is now complete. This resulted in some unprecedented approaches such as the intensive use of NEG coating Aluminium vessels, or the development of a dedicated superconducting RF cavity and of 190 kW solid state RF amplifiers. The construction, started in 2002, is now completed. The injector system (100 MeV Linac) and the 3 Hz full energy Booster synchrotron have reached nominal operating conditions by fall 2005. The installation of the Storage Ring was just completed and its commissioning started in May 2006. First 9 turns in the ring were achieved on May the 14th, and visible synchrotron radiation was also observed on a CCD camera. Innovative insertion devices were designed and built so as to provide the best possible performances in an energy range as large as 5 eV to 20 keV. These are helical electromagnetic devices with 640 mm and 256 mm periods, APPLE II type undulators with 80 mm period, and in-vacuum hybrid undulators with 20 mm period. Two infra-red beamlines providing both edge and constant dipole field emission are also under construction and a superconducting wiggler is currently being designed in order to provide high flux in the 10 to 50 keV range. A first set of 10 beamlines (out of 24 included in the project) is being built and will be tested from summer 2006 onwards, with the aim of starting Users operation by the beginning of 2007.

  8. Model Quality Control Matrix Tools for Defining Commissioning Process

    E-Print Network [OSTI]

    Nakahara, N.; Onojima, H.; Kamitani, K.

    2004-01-01

    to computerized documents, URLs or edocuments, URLs or e--mail addresses. mail addresses. Structure of MQC Matrix continued Structure of MQC Matrix continued Operation of MQC Two functions of MQC tool. ?One is the organized database management of commissioning...

  9. Development of an Information Flow Mechanism for Commissioning

    E-Print Network [OSTI]

    Miyata, M.; Yoshida, H.; Yoshida, H.

    2008-01-01

    The present paper proposes a new information flow mechanism for commissioning and develops tools to make the proposed information flow mechanism feasible. Although many technical tools have been developed in order to reduce the amount of labor...

  10. oo Ris Report No. 308 J* Danish Atomic Energy Commission

    E-Print Network [OSTI]

    on exchange from: Library, Danish Atomic Energy Commission, Ris, DK-4000 Roskilde, Denmark #12;if ay 1974 together with similar results obtained from the liquids A, He, and Rb sup- port the classification

  11. The FIRE infrared spectrometer at Magellan: construction and commissioning

    E-Print Network [OSTI]

    Simcoe, Robert A.

    We describe the construction and commissioning of FIRE, a new 0.8-2.5?m echelle spectrometer for the Magellan/ Baade 6.5 meter telescope. FIRE delivers continuous spectra over its full bandpass with nominal spectral ...

  12. Continuous Commissioning of Salt Lake Community College South City Campus

    E-Print Network [OSTI]

    Deng, S.; Turner, W. D.; Hood, J.

    2004-01-01

    The State of Utah's Department of Natural Resources funded two projects in Salt Lake City to demonstrate the feasibility of the Continuous Commissioning (CC)1 process. The two sites selected were a modern state building, the Matheson Courthouse [1...

  13. 1 | P a g e Chancellor's Commission on Environmental Sustainability

    E-Print Network [OSTI]

    Farritor, Shane

    1 | P a g e Chancellor's Commission on Environmental Sustainability Policies and Practices for Environmental Sustainability-University of Nebraska-Lincoln ____________________________________________________________________ Mission Statement Environmental sustainability is the movement toward redesigning the way society

  14. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  15. The Optimization of Control Parameters for VAV HVAC System Commissioning

    E-Print Network [OSTI]

    Song, S.; Maehara, K.; Sagara, N.

    2006-01-01

    kind of commissioning technique as follows. We identified the dynamic characteristics of components of an actual VAV HVAC system such as rooms, VAV dampers, two way valves and chilled water coils, and verified the behaviors of the models and choose...

  16. Chapter 1 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    Chapter 1 of the Wyoming Public Service Commission Regulations: Rules of Practice and Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  17. Embedding Continuous Commissioning in an Energy Efficiency Retrofit Program

    E-Print Network [OSTI]

    Martinez, J. T.; Claridge, D.; Baltazar-Cervantes, J. C.; Turner, W. D.; Wei, G.; Verdict, M.

    2006-01-01

    and building heating, ventilation, and air conditioning (HVAC) systems, as well as how deferred maintenance issues, key to the success of any commissioning project, were addressed and adminstered by the CC engineer....

  18. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  19. Remarks by Federal Blue Ribbon Commission J. David Jameson ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commission J. David Jameson Atlanta, GA October 18, 2011 2 We co-sponsored print ads as part of a national campaign to ask our elected officials and candidates where they...

  20. Orlando Utilities Commission- Commercial Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Orlando Utilities Commission (OUC) offers rebates on a variety of energy efficient improvements for commercial customers. Customers should view the program brochure on the web site listed above for...

  1. MEDITERRANEAN ACTION PLAN MEDITERRANEAN COMMISSION FOR SUSTAINABLE DEVELOPMENT

    E-Print Network [OSTI]

    Zaferatos, Nicholas C.

    urbanisation and promoting sustainable urban development..............16 2.3. Promoting `quality' agricultureMEDITERRANEAN ACTION PLAN MEDITERRANEAN COMMISSION FOR SUSTAINABLE DEVELOPMENT MEDITERRANEAN STRATEGY FOR SUSTAINABLE DEVELOPMENT Draft (work in progress) UNEP/MAP Athens, 17 February 2005 #12

  2. Improving Building Energy System Performance by Continuous Commissioning

    E-Print Network [OSTI]

    Turner, W. D.; Liu, M.; Claridge, D. E.; Haberl, J. S.

    1996-01-01

    The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly energy use and environmental...

  3. Blue Ribbon Commission on America's Nuclear Future Charter |...

    Broader source: Energy.gov (indexed) [DOE]

    The Secretary of Energy, acting at the direction of the President, is establishing the Commission to conduct a comprehensive review of policies for managing the back end of the...

  4. Richard Lazarus Named as Executive Director of National Commission...

    Broader source: Energy.gov (indexed) [DOE]

    D.C. - The co-chairs of the bipartisan National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling have selected a highly regarded Georgetown University law...

  5. Blue Ribbon Commission on America's Nuclear Future Report to...

    Broader source: Energy.gov (indexed) [DOE]

    Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for...

  6. Nuclear Regulatory Commission Issuances. Volume 39, No. 2

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  7. LHC optics commissioning at beta*40 cm and 60 cm

    E-Print Network [OSTI]

    Langner, Andy Sven; Coello De Portugal - Martinez Vazquez, Jaime Maria; Garcia-Tabares Valdivieso, Ana; Maclean, Ewen Hamish; Malina, Lukas; Persson, Tobias Hakan Bjorn; Mnig, Saskia; Salvachua Ferrando, Belen Maria; Skowronski, Piotr Krzysztof; Tomas Garcia, Rogelio; Wenninger, Jorg; CERN. Geneva. ATS Department

    2015-01-01

    This paper reports on the results of the beta* = 40 cm and = 60 cm optics commissioning for the LHC at 6.5TeV from MD blocks I and II.

  8. Interstate Commission on the Potomac River Basin (Multiple States)

    Broader source: Energy.gov [DOE]

    The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through...

  9. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Broader source: Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  10. NRC Research Program on Plant Aging: Listing and summaries of reports issued through September 1993. Revision 4

    SciTech Connect (OSTI)

    Vora, J.P.

    1993-12-01

    The US Nuclear Regulatory Commission is conducting the Nuclear Plant Aging Research (NPAR) Program. This is a comprehensive hardware-oriented engineering research program focused on understanding the aging mechanisms of components and systems in nuclear power plants. The NPAR program also focuses on methods for simulating and monitoring the aging-related degradation of these components and systems. In addition, it provides recommendations for effective maintenance to manage aging and for implementation of the research results in the regulatory process. This document contains a listing and index of reports generated in the NPAR Program that were issued through September 1993 and summaries of those reports. Each summary describes the elements of the research covered in the report and outlines the significant results. For the convenience of the user, the reports are indexed by personal author, corporate author, and subject.

  11. NRC Job Code V6060: Extended in-situ and real time monitoring. Task 4: Detection and monitoring of leaks at nuclear power plants external to structures

    SciTech Connect (OSTI)

    Sheen, S. H.

    2012-08-01

    In support of Task 4 of the NRC study on compliance with 10 CFR part 20.1406, minimization of contamination, Argonne National Laboratory (ANL) conducted a one-year scoping study, in concert with a parallel study performed by NRC/NRR staff, on monitoring for leaks at nuclear power plants (NPPs) external to structures. The objective of this task-4 study is to identify and assess those sensors and monitoring techniques for early detection of abnormal radioactive releases from the engineered facility structures, systems and components (SSCs) to the surrounding underground environment in existing NPPs and planned new reactors. As such, methods of interest include: (1) detection of anomalous water content of soils surrounding SSCs, (2) radionuclides contained in the leaking water, and (3) secondary signals such as temperature. ANL work scope includes mainly to (1) identify, in concert with the nuclear industry, the sensors and techniques that have most promise to detect radionuclides and/or associated chemical releases from SSCs of existing NPPs and (2) review and provide comments on the results of the NRC/NRR staff scoping study to identify candidate technologies. This report constitutes the ANL deliverable of the task-4 study. It covers a survey of sensor technologies and leak detection methods currently applied to leak monitoring at NPPs. The survey also provides a technology evaluation that identifies their strength and deficiency based on their detection speed, sensitivity, range and reliability. Emerging advanced technologies that are potentially capable of locating releases, identifying the radionuclides, and estimating their concentrations and distributions are also included in the report along with suggestions of required further research and development.

  12. Investigation of the Feasibility of a Small Scale Transmutation Device

    E-Print Network [OSTI]

    Sit, Roger Carson

    2009-01-01

    Summary 2008-12. Nuclear Regulatory Commission, May 9, 2008.be labeled by the Nuclear Regulatory Commission (NRC) in itscodified in the Nuclear Regulatory Commissions radiation

  13. NRC Fact-Finding Task Force report on the ATWS event at Salem Nuclear Generating Station, Unit 1, on February 25, 1983

    SciTech Connect (OSTI)

    Not Available

    1983-03-01

    An NRC Region I Task Force was established on March 1, 1983 to conduct fact finding and data collection with regard to the circumstances which led to an anticipated transient without scram (ATWS) event at the Public Service Electric and Gas Company's Salem Generating Station, Unit 1 on February 25, 1983. The charter of the Task Force was to determine the factual information pertinent to management and administrative controls which should have ensured proper operation of the reactor trip breakers in the solid state protection system. This report documents the findings of the Task Force along with its conclusions.

  14. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE REporting requirements_presentations_4-29-14.ppt [Compatibility M

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) AugustA. -71-3Overview of DOE and NRC Reporting to

  15. Installation and Commissioning Automated Demand Response Systems

    SciTech Connect (OSTI)

    Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

    2008-04-21

    Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

  16. Cohomological Invariants of Algebraic Tori

    E-Print Network [OSTI]

    Blinstein, Semyon

    2012-01-01

    High Porosity Silica Aerogels. J. Non-Crystalline SolidsW.P. Halperin. Anisotropic Aerogels for Studying Super?uidCompressed Silica Aerogels for the Study of Super?uid 3

  17. Responding to WMD Terrorism Threats: The Role of Insurance Markets

    E-Print Network [OSTI]

    Jaffee, Dwight M.; Russell, Thomas

    2007-01-01

    to the U.S. Nuclear Regulatory commission. The study isthe U.S. Nuclear Regulatory Commission (NRC) sets standards

  18. Commissioning a new EUV Fresnel zoneplate mask-imaging microscope for lithography generations reaching 8 nm

    E-Print Network [OSTI]

    Goldberg, Kenneth A.

    2014-01-01

    Commissioning a new EUV Fresnel zoneplate mask-imagingimaging system relies on Fresnel zoneplate lenses, which

  19. US Nuclear Regulatory Commission functional organization charts, March 15, 1993. Revision 16

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  20. From Use Cases of the Joint European Torus towards Integrated Commissioning Requirements of the ITER Tokamak

    E-Print Network [OSTI]

    From Use Cases of the Joint European Torus towards Integrated Commissioning Requirements of the ITER Tokamak

  1. Analysis of fuel relocation for the NRC/PNL Halden assemblies IFA-431, IFA-432, and IFA-513. Interim report

    SciTech Connect (OSTI)

    Williford, R.E.; Mohr, C.L.; Lanning, D.D.; Cunningham, M.E.; Rausch, W.N.

    1980-06-01

    The effects of the thermally-induced cracking and subsequent relocation of UO2 fuel pellets on the thermal and mechanical behavior of light-water reactor fuel rods during irradiation are quantified in this report. Data from the Nuclear Regulatory Commission/Pacific Northwest Laboratory Halden experiments on instrumented fuel assemblies (IFA) IFA-431, IFA-432, and IFA-513 are analyzed. Beginning-of-life in-reactor measurements of fuel center temperatures, linear heat ratings, and cladding axial elongations are used in a new model to solve for the effective thermal conductivity and elastic moduli of the cracked fuel column. The primary assumptions of the new model are that (1) the cracked fuel is in a hydrostatic state of stress in the (r,theta) plane, and that (2) there is no axial slipping between fuel and cladding. Three basic parameters are used to describe the cracked fuel: (1) the crack pattern, (2) the crack roughness, and (3) the fuel surface (gap) roughness. Recommendations are made on refining the model.

  2. Analysis of fuel relocation for the NRC/PNL Halden assemblies IFA-431, IFA-432, and IFA-513

    SciTech Connect (OSTI)

    Williford, R.E.; Mohr, C.L.; Lanning, D.D.; Cunningham, M.E.; Rausch, W.N.; Bradley, E.R.

    1980-04-01

    The effects of the thermally-induced cracking and subsequent relocation of UO/sub 2/ fuel pellets on the thermal and mechanical behavior of light-water reactor fuel rods during irradiation are quantified in this report. Data from the Nuclear Regulatory Commission/Pacific Northwest Laboratory Halden experiments on instrumented fuel assemblies (IFA) IFA-431, IFA-432, and IFA-513 are analyzed. Beginning-of-life in-reactor measurements of fuel center temperatures, linear heat ratings, and cladding axial elongations are used in a new model to solve for the effective thermal conductivity and elastic moduli of the cracked fuel column. The effective thermal conductivity and elastic moduli for the cracked fuel were found to be significantly reduced from the values for solid UO/sub 2/ pellets. The calculated fuel-cladding gap remained relatively constant (closed) with respect to power level, indicating that the fuel fragments do not retreat from the cladding when the power/temperature is reduced. Recommendations are made pertaining to the work required to further refine the model. 30 refs., 81 figs., 8 tabs.

  3. EPA 520/1-89-002 A GUIDE FOR DETERMINING COMPLIANCE WITH THE

    E-Print Network [OSTI]

    apply to certain facilities licensed by the Nuclear Regulatory Commission (NRC) or its Agreement States

  4. MARSAME Appendix B B. SOURCES OF BACKGROUND RADIOACTIVITY

    E-Print Network [OSTI]

    : The Nuclear Regulatory Commission (NRC) provides information concerning background radioactivity in Background

  5. First commissioning of the HLS-II storage ring

    E-Print Network [OSTI]

    Liu, Gang-Wen; Xu, Wei; Wang, Lin; Li, Wei-Min; Li, Jing-yi

    2015-01-01

    To meet the increasing requirements of synchrotron radiation users, the upgrade project to enhance the performance of Hefei Light Source (HLS), named HLS-II, was launched in 2010, and in 2014 the first commissioning of HLS-II was successfully completed. After the commissioning, the main design goals for the HLS-II storage ring have been achieved, with natural emittance of electron beam lower than 40 nm-rad at 800 MeV, five insertion devices installed in straight sections and root mean square (rms) jitter of closed orbit smaller than 4 {\\mu}m, making HLS-II at a higher level among the same class of machines in the world. This paper reports on the results of the commissioning of the HLS-II storage ring, which includes linear optics correction, compensation of insertion devices effect and closed orbit feedback.

  6. A summary of the California Public Utilities Commission`s two competing electric utility restructuring proposals

    SciTech Connect (OSTI)

    Porter, K.

    1995-11-01

    In May 1995, the California Public Utilities Commission (CPUC) released two proposals for restructuring the state`s electric power industry. The two proposals follow more than a year of testimony and public comment after the CPUC issued the ``Blue Book`` (CPUC 1994a) on April 20, 1994, which called for retail wheeling to be phased in to all customers over 5 years. The majority proposal, supported by three of the four CPUC commissioners (one seat was vacant when the proposals were released), calls for creating a central pool, or ``poolco``; setting electric prices to reflect true costs of service, or ``real-time pricing``; and allowing parties to negotiate ``contracts for differences`` between the pool price and the contract price. The minority proposal, sponsored by Commissioner Jesse Knight, calls for retail wheeling, or ``direct access,`` and for utilities to divest or spin off their generating assets. This paper presents a summary of the major provisions of the two CPUC proposals and the possible implications and issues associated with each. It is aimed at researchers who may be aware that various efforts to restructure the electric power industry are under way and want to known more about California`s proposals, as well as those who want to known the implications of certain restructuring proposals for renewable energy technologies. Presented at the end of the paper is a summary of alternative proposals promoted by various stakeholder in response to the two CPUC proposals.

  7. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect (OSTI)

    NONE

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  8. STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY CALIFORNIA ENERGY COMMISSION 151 6 NINTH STREET SACRAMENTO, CA 95814-551 2 www.energy.ca.gov Buildings Technologies Program Building Energy Codes Program Manager U.S. Department of Energy August 7, 2013 Office of Energy Efficiency and Renewable Energy

  9. STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY CALIFORNIA ENERGY COMMISSION 1516 Ninth Street Sacramento, California 95814 Main website: WWN.energy.ca.gov STATE OF CALIFORNIA ENERGY RESOURCES Energy Policy Report Update (20121EPR Update), Background Public Resources Code Section 25302 requires

  10. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    of section 5.4 of the Master Settlement Agreement (or MSA), a settlement agreement by and among El Paso and Settlement and Release of Claims Agreement (collectively, the Settlement) submitted to the Commission of a "Joint Explanatory Statement" and a "Settlement and Release of Claims Agreement" filed pursuant to Rule

  11. Project Sponsors: California Energy Commission Department of Energy

    E-Print Network [OSTI]

    Mease, Kenneth D.

    Project Sponsors: California Energy Commission Department of Energy Shell Oil Company ADVANCED of biological waste products to produce renewable hydrogen. The region under consideration is the Southern in this study are sewage waste, municipal waste, agricultural waste, and forestry waste. The primary hydrogen

  12. California Energy Commission "We have the largest rooftop solar

    E-Print Network [OSTI]

    solar system in the nation!" Matt Muniz, P.E. Energy Program Manager Alameda County "With the Energy Commission's Energy Efficiency Financing Program we installed our 1.18 MW solar project at Santa Rita Jail on Back of Flyer June 2006 #12;DON'T MISS THIS OPPORTUNITY Need Project Funding? You already know

  13. >T Danish Atomic Energy Commission ? Research Establishment Riso

    E-Print Network [OSTI]

    to Available on request from the Library of the Danish Atomic Energy Commission (Atomenergikommissionens by designers to be effective. A classification of control tasks has been worked out as part of the study of structures in control systems (1). Applying this classification, an analysis has been started

  14. Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT)

    E-Print Network [OSTI]

    Claridge, D. E.; Lin, G.

    2009-01-01

    in identifying the possible cause(s) of the problem. This report presents the results of a retrospective implementation of ABCAT on five buildings, each of which consists of offices, classrooms and laboratories and has at least three years of post commissioning...

  15. CentrePiece Summer 2010 he European Commission is

    E-Print Network [OSTI]

    trading phase of the European Union's (EU) Emissions Trading System (ETS), which will begin in January. The European Commission plans to tighten the greenhouse gas emissions targets in the Emissions Trading System lax. Europe's emissions trading scheme: taxpayers versus the industry lobby #12;CentrePiece Summer

  16. First beam commissioning at BNL ERL SRF Gun

    SciTech Connect (OSTI)

    Xu, W.; Altinbas, Z.; Belomestnykh, S.; Ben-Zvi, I.; Deonarine, S.; DeSanto, L.; Gassner, D.; Gupta, R. C.; Hahn, H.; Hammons, L.; Ho, C.; Jamilkoski, J.; Kankiya, P.; Kayran, D.; Kellerman, R.; Laloudakis, N.; Lambiase, R.; Liaw, C.; Litvinenko, V.; Mahler, G.; Masi, L.; McIntyre, G.; Miller, T.; Philips, D.; Ptitsyn, V.; Seda, T.; Sheehy, B.; Smith, K.; Rao, T.; Steszyn, A.; Tallerico, T.; Than, R.; Tuozollo, J.; Wang, E.; Weiss, D.; Wiliniski, M.; Zaltsman, A.

    2015-05-03

    The 704 MHz SRF gun successfully generated the first photoemission beam in November of 2014. The configurations of the test and the sub-systems are described.The latest results of SRF commissioning, including the cavity performance, cathode QE measurements, beam current/energy measurements, are presented in the paper.

  17. Forestry Commission Wales Guidance on rental levels for Hydro Power

    E-Print Network [OSTI]

    initiated a process to facilitate the development of small- scale hydro-electricity schemes on land ownedForestry Commission Wales Guidance on rental levels for Hydro Power Guidance on rental levels for hydro power projects Tel: 02920 475961 Email: hydrowales@forestry.gsi.gov.uk Version 1.0 Mike Pitcher 17

  18. THE NATIONAL COMMISSION ON ENERGY POLICY December 2004

    E-Print Network [OSTI]

    Laughlin, Robert B.

    ENERGY SUPPLIES 41 Introduction 41 A. Natural Gas 44 B. Advanced Coal Technologies 51 C. Nuclear Energy ENERGY-SUPPLY INFRASTRUCTURE 84 A. Introduction 84 B. Site Critical Energy Infrastructure 84 C. ProtectTHE NATIONAL COMMISSION ON ENERGY POLICY December 2004 ENDING THE ENERGY STALEMATE A Bipartisan

  19. Commission of the European Communities PHOTOSYNTHETIC WATER OXIDATION

    E-Print Network [OSTI]

    Junge, Wolfgang

    Commission of the European Communities energy PHOTOSYNTHETIC WATER OXIDATION BY GREEN PLANTS Communities energy PHOTOSYNTHETIC WATER OXIDATION BY GREEN PLANTS: ON THE ROLE OF PROTONS W. JUNGE, V. FRSTER is technically perhaps the most chal lenging performance of green plant photosynthesis. The plant uses

  20. California Public Utilities Commission 505 Van Ness Ave., San Francisco

    E-Print Network [OSTI]

    DISCUSSION ON UTILIZING ENERGY CONSUMPTION DATA TO IMPROVE EFFECTIVENESS OF POLICIES AND PROGRAMS SAN Thought Leaders Speaker Series will address the issue of utilizing energy consumption data to evaluate, California Energy Commission WHY: Currently, access to energy consumption data is difficult and sometimes

  1. Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

    2008-03-31

    This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

  2. COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 8.3.2006

    E-Print Network [OSTI]

    ................................................................................................................ 17 #12;EN 3 EN GREEN PAPER A European Strategy for Sustainable, Competitive and Secure Energy (TextEN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 8.3.2006 COM(2006) 105 final GREEN PAPER A European Strategy for Sustainable, Competitive and Secure Energy {SEC(2006) 317} #12;EN 2 EN CONTENTS 1

  3. U.S. ATOMIC ENERGY COMMISSION REGULATORY GUIDE

    E-Print Network [OSTI]

    U.S. ATOMIC ENERGY COMMISSION REGULATORY GUIDE DIRECTORATE OF REGULATORY STANDARDS JUNE 1974 OF OPERATING LICENSES FOR NUCLEAR REACTORS A. INTRODUCTION Section 50.51, "Duration of license, renewal," of 10 CFR Part 50, "Licensing of Production and Utilization Facilities," requires that each license

  4. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    entity manipulated short-term prices for electric energy or natural gas in the West or otherwiseUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 105 FERC ¶ 61,008 Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. Reliant Energy Services, Inc

  5. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    of Electric and Natural Gas Prices Enron Power Marketing, Inc. and Enron Energy Services, Inc. Enron PowerUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T of Energy and Ancillary Services Investigation of the Practices of the California Independent System

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    -Finding Investigation Into Possible Manipulation of Electric and Natural Gas Prices PacifiCorp PPM Energy, Inc. (fUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T Company v. Sellers of Energy and Ancillary Services Investigation of Practices of the California

  7. Ri* Report No. 133 Danish Atomk Energy Commission

    E-Print Network [OSTI]

    Commission Research Establishment Riso Chemistry Department Abstract As part of the work aimed at the exploitation of the uraniferous rock in southern Greenland a flotation process has been developed. The uranium as a possible source of uranium for Denmark's future energy supply. The uranium-bearing rock is a lujavrite

  8. Methods for Automated and Continuous Commissioning of Building Systems

    SciTech Connect (OSTI)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  9. CALIFORNIA ENERGY COMMISSION SPECIAL DISTRICTS HOSPITALS & PUBLIC CARE COLLEGES & UNIVERSITIES

    E-Print Network [OSTI]

    Whether you are building a new facility, renovating an existing one, or want to reduce your energy billsCALIFORNIA ENERGY COMMISSION SPECIAL DISTRICTS HOSPITALS & PUBLIC CARE COLLEGES & UNIVERSITIES F O 2004 www.energy.ca.gov/efficiency/partnership Call (916) 654-4147 #12;The Energy Partnership Program

  10. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    SciTech Connect (OSTI)

    NONE

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  11. Nuclear Regulatory Commission issuances. Volume 46, Number 1

    SciTech Connect (OSTI)

    NONE

    1997-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  12. Validation of the U.S. NRC coupled code system TRITON/TRACE/PARCS with the special power excursion reactor test III (SPERT III)

    SciTech Connect (OSTI)

    Wang, R. C.; Xu, Y.; Downar, T.; Hudson, N.

    2012-07-01

    The Special Power Excursion Reactor Test III (SPERT III) was a series of reactivity insertion experiments conducted in the 1950's. This paper describes the validation of the U.S. NRC Coupled Code system TRITON/PARCS/TRACE to simulate reactivity insertion accidents (RIA) by using several of the SPERT III tests. The work here used the SPERT III E-core configuration tests in which the RIA was initiated by ejecting a control rod. The resulting super-prompt reactivity excursion and negative reactivity feedback produced the familiar bell shaped power increase and decrease. The energy deposition during such a power peak has important safety consequences and provides validation basis for core coupled multi-physics codes. The transients of five separate tests are used to benchmark the PARCS/TRACE coupled code. The models were thoroughly validated using the original experiment documentation. (authors)

  13. Commissioning tools for life-cycle building performance assurance

    SciTech Connect (OSTI)

    Piette, M.A.

    1996-05-01

    This paper discusses information systems for building life-cycle performance analysis and the use of computer-based commissioning tools within this context. There are many reasons why buildings do not perform in practice as well as intended at the design stage. One reason is the lack of commissioning. A second reason is that design intent is not well documented, and performance targets for building components and systems are not well specified. Thus, criteria for defining verification and functional tests is unclear. A third reason is that critical information is often lost throughout the building life-cycle, which causes problems such as misunderstanding of operational characteristics and sequences and reduced overall performance. The life-cycle building performance analysis tools project discussed in this paper are focused on chillers and cooling systems.

  14. COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

    SciTech Connect (OSTI)

    Allison, Trent; Davis, G; Drury, Michael; Harwood, Leigh; Hogan, John; Kimber, Andrew; Lahti, George; Merz, William; Nelson, Richard; Plawski, Tomasz; Seidman, David; Spata, Michael; Wilson, Michael

    2012-07-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

  15. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect (OSTI)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  16. Case Study of Energy Diagnose and Re-commissioning in a Green Office Building

    E-Print Network [OSTI]

    Zhang, Y.; Wei, Q.

    2006-01-01

    to design phase and generally ignore commissioning phase after construction. It leads an inefficiently facility management of HVAC systems and components. Energy diagnose and re-commissioning by on-site measurement can solve these problems, to improve...

  17. Product and Process Modeling for Functional Performance Testing in Low-Energy Building Embedded Commissioning Cases

    E-Print Network [OSTI]

    Akcamete, A.; Garrett, J.; Akinci, B.; Akin, O.; Lee, K. J.

    2007-01-01

    Our work deals with creating information assistance for commissioning (Cx) low-energy buildings throughout their life-cycle. We call this Embedded Commissioning in reference to the integration of persistent and reliable Cx information. We have...

  18. Commissioning Aid and Decision Making Assistance Tool 'Implementation & Assessment' - Case Study

    E-Print Network [OSTI]

    Belkadi-Hannachi, N.; Jandon, M.; Nejad, H. V.; Guena, F.; Diab, Y.

    2006-01-01

    The precedent paper, published in ICEBO 2005 presented the approach and methodology for information flow management in the commissioning of low energy buildings. Within this methodology, commissioning and decision making are included in the low...

  19. The development and testing of an automated building commissioning anlaysis tool (abcat)

    E-Print Network [OSTI]

    Curtin, Jonathan M.

    2009-05-15

    More than $18 billion of energy is wasted annually in the U.S. commercial building sector. Retro-Commissioning services have proven to be successful with relatively short payback times, but tools that support the commissioning effort in maintaining...

  20. Getting a Better Performing Building: Commissioning and Real Time Data Analysis

    E-Print Network [OSTI]

    Barba, M.

    2002-01-01

    reliable system performance data. This paper will utilize EH&E's commissioning experience and methods to explore the relationship between HVAC system performance verification and good Measurement and Verification practice in both the commissioning of new...

  1. A Case Study of Retro Commissioning in a Standard Commercial Office Building in Japan

    E-Print Network [OSTI]

    Kamitani, K.; Shimazu, M.; Inomata, N.

    2006-01-01

    This paper describes retro commissioning of a standard commercial office building in Japan. The owner's expectations for retro commissioning are realization of energy and cost savings, and controlling the increase in electric power demand, while...

  2. A Case Study of Continuous Commissioning of the VAV System in China

    E-Print Network [OSTI]

    Xia, C.; Zhu, Y.; Chen, H.; Han, Z.; Xu, G.

    2006-01-01

    This paper introduces a continuous commissioning of the VAV system in a real building in China. On the base of nearly one year's testing data, the energy conservation level of the project is analyzed, and significance of further commissioning...

  3. Can Free Entry Be Inefficient? Fixed Commissions and Social Waste in the Real Estate Industry

    E-Print Network [OSTI]

    Hsieh, Chang-Tai T; Moretti, Enrico

    2002-01-01

    Commission. The Residential Real Estate Brokerage Industry.r m C o m p e t i t i o n i n Real Estate Commission Rates"The Journal of Real Estate Research 3 (1989) Hopkins, T o

  4. Lessons and Measures Learned from Continuous Commissioning(SM) of Central Chilled/Hot Water Systems

    E-Print Network [OSTI]

    Deng, S.; Turner, W. D.; Claridge, D. E.; Bruner, H.; Chen, H.; Wei, G.

    2001-01-01

    As it has been proved repeatedly that commissioning is very necessary for new construction and renovation/retrofit projects, we found continuous commissioningSM (CC) is an effective and efficient way to manage and optimize existing central chilled...

  5. Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission...

    Office of Environmental Management (EM)

    Third Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation Factsheet: Third Meeting of the U.S.-Japan Bilateral Commission on Civil Nuclear Cooperation June...

  6. Application of Various HVAC Simulation Programs and Visual Tools to Commissioning

    E-Print Network [OSTI]

    Zheng, M.; Pan, S.

    2007-01-01

    Various existing HVAC system simulation programs and visualization tools are considered to be potentially powerful tools for commissioning. Although not originally developed as commissioning tools, these programs facilitate the confirmation...

  7. Commissioning of the Fresno, California, Retrofit Unoccupied Test House

    SciTech Connect (OSTI)

    Stecher, D.; Imm, C.

    2013-06-01

    Commissioning of instrumentation and limited short-term testing have been completed on a retrofit unoccupied test house in Fresno, California. This house is intended to be used as a laboratory in which several different methods of space conditioning distribution will be evaluated. This report provides background on the project, including specifications of the house and models used in its development, along with models to be evaluated through its operation.

  8. Analysis on linac quadrupole misalignment in FACET commissioning 2012

    SciTech Connect (OSTI)

    Sun, Yipeng; /SLAC

    2012-07-05

    In this note, the analysis on linac quadrupole misalignment is presented for the FACET linac section LI05-09 plus LI11-19. The effectiveness of the beam-based alignment technique is preliminarily confirmed by the measurement. Beam-based alignment technique was adopted at SLAC linac since SLC time. Here the beam-based alignment algorithms are further developed and applied in the FACET commissioning during 2012 run.

  9. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    SciTech Connect (OSTI)

    NONE

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  10. Texas Railroad Commission - Pollution Discharge Regulations | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013) | OpensourceInformation Railroad Commission - Pollution

  11. Commissioning of the IGp Feedback System at DAFNE

    SciTech Connect (OSTI)

    Drago, A.; /Frascati; Fox, J.D.; /SLAC; Teytelman, D.; /Dimtel, Redwood City; Tobiyama, M.; /KEK, Tsukuba

    2011-11-01

    The iGp (Integrated Gigasample Processor) is an innovative digital bunch-by-bunch feedback system developed by a KEK / SLAC / INFN-LNF joint collaboration. The processing unit can sample at 500 MHz and compute the bunch-by-bunch output signal for up to {approx}5000 bunches. The feedback gateware code is implemented inside just one FPGA (Field Programmable Gate Array) chip, a Xilinx Virtex-II. The FPGA implements two banks of 16-tap FIR (Finite Impulse Response) filters. Each filter is realtime programmable through the operator interface. At DA{Phi}NE, the Frascati {Phi}-Factory, two iGp units have been commissioned in the April 2007. The iGp systems have substituted the previous betatron feedback systems. This insertion has been very fast and has shown no problems involving just a substitution of the old, less flexible, digital systems, letting unchanged the baseband analog frontend and backend. The commissioning has been very simple, due to the complete and powerful EPICS operator interface, working well in local and remote operations. The software includes also tools for analyzing post processor data. A description of the commissioning with the operations done is reported.

  12. Commission to Review the Effectiveness of the National Energy Laboratories- September 15, 2014

    Broader source: Energy.gov [DOE]

    This was the second meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL).

  13. Commission to Review the Effectiveness of the National Energy Laboratories- October 6, 2014

    Broader source: Energy.gov [DOE]

    This was the third meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  14. Commission to Review the Effectiveness of the National Energy Laboratories, February 24, 2015

    Broader source: Energy.gov [DOE]

    This is the sixth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  15. Commission to Review the Effectiveness of the National Energy Laboratories, December 15, 2014

    Broader source: Energy.gov [DOE]

    This is the fifth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  16. US Nuclear Regulatory Commission functional organization charts, January 31, 1992. Revision 15

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  17. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 19

    SciTech Connect (OSTI)

    NONE

    1996-01-31

    Functional statements and organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  18. Comparative Assessment of Status and Opportunities for CO2 Capture and Storage and Radioactive Waste Disposal in North America

    E-Print Network [OSTI]

    Oldenburg, C.

    2010-01-01

    2004. NRC (Nuclear Regulatory Commission), Yucca MountainPlan, In: U.S. Nuclear Regulatory Commission, Report NUREG-mrem. The U.S. Nuclear Regulatory Commission (NRC) is the

  19. The Ghost of the Bomb : the Bravo Medical Program, scientific uncertainty, and the legacy of U.S. Cold War science, 1954-2005

    E-Print Network [OSTI]

    Harkewicz, Laura J.

    2010-01-01

    the AEC. The Nuclear Regulatory Commission (NRC) took overfor the U.S. Nuclear Regulatory Commission. 426 Bertells1990, the U.S. Nuclear Regulatory Commission (NRC) adopted

  20. FUTURE URBAN LIVING A policy commission investigating the most appropriate means for

    E-Print Network [OSTI]

    Birmingham, University of

    FUTURE URBAN LIVING A policy commission investigating the most appropriate means for accommodating changing populations and their needs in the cities of the future The Report 2014 #12;2 Birmingham Policy Commission on Future Urban Living Foreword by the Chair of the Policy Commission I am delighted to have been

  1. Project Reports for Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  2. RADIOLOGICAL HEALTH AND RELATED STANDARDS FOR NUCLEAR POWER PLANTS. VOLUME 2 OF HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA

    E-Print Network [OSTI]

    Nero, A.V.

    2010-01-01

    Measurements - Nuclear Regulatory Commission - protectiveand by the Nuclear Regulatory Commission (NRC) as a basisplants. The Nuclear Regulatory Commission is the agency

  3. Applied Demography In Action: A Case Study of Population Identification.

    E-Print Network [OSTI]

    Swanson, David A

    2008-01-01

    of New U.S. Nuclear Regulatory Commission (NRC) Regulationsby the US Nuclear Regulatory Commission for purposes of Sitetablis par le US Nuclear Regulatory Commission pour tablir

  4. Commissioning of output factors for uniform scanning proton beams

    SciTech Connect (OSTI)

    Zheng Yuanshui; Ramirez, Eric; Mascia, Anthony; Ding Xiaoning; Okoth, Benny; Zeidan, Omar; Hsi Wen; Harris, Ben; Schreuder, Andries N.; Keole, Sameer [ProCure Proton Therapy Center, 5901 West Memorial Road, Oklahoma City, Oklahoma 73142 (United States); ProCure Treatment Centers, 420 North Walnut Street, Bloomington, Indiana 47404 (United States); ProCure Proton Therapy Center, 5901 West Memorial Road, Oklahoma City, Oklahoma 73142 (United States)

    2011-04-15

    Purpose: Current commercial treatment planning systems are not able to accurately predict output factors and calculate monitor units for proton fields. Patient-specific field output factors are thus determined by either measurements or empirical modeling based on commissioning data. The objective of this study is to commission output factors for uniform scanning beams utilized at the ProCure proton therapy centers. Methods: Using water phantoms and a plane parallel ionization chamber, the authors first measured output factors with a fixed 10 cm diameter aperture as a function of proton range and modulation width for clinically available proton beams with ranges between 4 and 31.5 cm and modulation widths between 2 and 15 cm. The authors then measured the output factor as a function of collimated field size at various calibration depths for proton beams of various ranges and modulation widths. The authors further examined the dependence of the output factor on the scanning area (i.e., uncollimated proton field), snout position, and phantom material. An empirical model was developed to calculate the output factor for patient-specific fields and the model-predicted output factors were compared to measurements. Results: The output factor increased with proton range and field size, and decreased with modulation width. The scanning area and snout position have a small but non-negligible effect on the output factors. The predicted output factors based on the empirical modeling agreed within 2% of measurements for all prostate treatment fields and within 3% for 98.5% of all treatment fields. Conclusions: Comprehensive measurements at a large subset of available beam conditions are needed to commission output factors for proton therapy beams. The empirical modeling agrees well with the measured output factor data. This investigation indicates that it is possible to accurately predict output factors and thus eliminate or reduce time-consuming patient-specific output measurements for proton treatments.

  5. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  6. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  7. Continuous Commissioning Opportunities in Hospital and Laboratory Facilities

    E-Print Network [OSTI]

    Jones, A.; Claridge, D. E.; Turner, W. D.; Deng, S.; Wei, G.; Zeig, G.

    2008-01-01

    -CC and post-CC energy consumption data using IPMVP (International Performance Measurement & Verification Protocol, 2001) Option C. There was a total savings of $5,484,400 with a median (average) of $260,100 ($274,220) for 20 projects reporting. Figure 3... & Verification Protocol. 2001. DOE/GO-102001-1187. http://www.ipmvp.org Liu, M., Claridge, D. E., and Turner, W. D. 2002. Continuous Commissioning SM Guidebook: Maximizing Building Energy Efficiency and Comfort. Federal Energy Management Program, U...

  8. National Development and Reform Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to: navigation,Naples,Development and Reform Commission

  9. PP-03 Federal Power Commission | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926Families |Department ofINCREASESFederal Power Commission

  10. Public Utilities Commission of Nevada | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report Url JumpTechnology JumpPrueba 1 Jump to:PublicCommission of

  11. Public Utility Commission of Oregon | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report Url JumpTechnology JumpPrueba 1 Jump to:PublicCommission

  12. Public Utility Commission of Texas | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report Url JumpTechnology JumpPrueba 1 Jump to:PublicCommissionTexas

  13. Appendix S-51 - Transmission Line Approval - Public Utilities Commission |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminex A S Jump to:Angola onAperionCommission | Open EnergyOpen Energy

  14. Arizona Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin: EnergyYork Jump| OpenExplorationArgentina:Commission Jump to:

  15. Arkansas Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin: EnergyYork Jump|Line SitingOil and Gas Commission Jump to:

  16. April 22, 2015 Lab Commission Meeting Minutes | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u tCorporation |Inc.:ServicesSvcsApproval ofmonthlyCommission

  17. Report to the Nuclear Regulatory Commission from the staff panel on the Commission's determination of an Extraordinary Nuclear Occurrence (ENO)

    SciTech Connect (OSTI)

    none,

    1980-01-01

    The Panel finds that the first criterion, pertaining to whether the accident caused a discharge of radioactive material or levels of radiation offsite as defined in 10 CFR 140.84, has not been met. It further finds that there is presently insufficient information to support any definitive finding as to whether or not the second criterion, relating to damage to persons or property offsite as defined in 10 CFR 140.85, has been met. Since the Panel has not found that both criteria have been met, it recommends that the Commission determine that the accident at Three Mile Island did not constitute an extraordinary nuclear occurrence.

  18. Using Product Specific Simulation Models in a Tool for Manual Commissioning of Air Handling Units

    E-Print Network [OSTI]

    Eriksson, J.

    2003-01-01

    . Cetetherm IQHeat. Cetetherm. Ronneby. Sweden. 3. Portland Energy Conservation Inc. Methods for automated and continuous commissioning of build- ings. Air-Conditioning and refrigeraration technol- ogy institute, Arlington, Virginia. 4. T. Haasl, D... SPECIFIC SIMULATION MODELS IN A TOOL FOR MANUAL COMMISSIONING OF AIR HANDLING UNITS JRGEN ERIKSSON F-INSTALLATION AB GOTHENBURG, SWEDEN ABSTRACT This short paper describes an outline of a tool for manual commissioning of air handling units...

  19. Gore-Mbeki Binational Commission integrated housing program. Final report

    SciTech Connect (OSTI)

    1998-12-31

    This report documents the work done under Grant DE-FG36-97GO10209, Innovative Renewable Energy Technology Transfer Program. PEER Consultants, PC, and its subcontractor, PEER Africa (Pty.) Ltd., received an $88,000.00 grant to plan and build two energy efficient homes in the black township of Gugulethu in Cape Town, South Africa. These demonstration homes were given to the people of South Africa as a gesture of goodwill by the US government as part of the Gore-Mbeki Binational Commission (BNC) agreements and cooperation. The BNC is the term used to describe the agreement to work together by the US and the South African governments for economic development of South Africa in the areas of energy, commerce, agriculture, housing, and transportation. The BNC was formed in 1995. This project under the auspices of the BNC started in September 1996. The DOE-funded portion was performed between January 11, 1997 and February 28, 1997.

  20. Initial commissioning results with the NSCL Electron Beam Ion Trap

    SciTech Connect (OSTI)

    Schwarz, S.; Kittimanapun, K.; Lapierre, A.; Leitner, D.; Ottarson, J.; Portillo, M. [National Superconducting Cyclotron Laboratory, NSCL, Michigan State University, East Lansing, Michigan 48824 (United States); Bollen, G. [National Superconducting Cyclotron Laboratory, NSCL, Michigan State University, East Lansing, Michigan 48824 (United States); Department of Physics and Astronomy, Michigan State University, East Lansing, Michigan 48824 (United States); Lopez-Urrutia, J. R. Crespo [Max-Planck Institut fuer Kernphysik, Saupfercheckweg 1, 69117 Heidelberg (Germany); Kester, O. [GSI Helmholtzzentrum fuer Schwerionenforschung, Planckstr. 1, 64291 Darmstadt (Germany)

    2012-02-15

    The ReA reaccelerator is being added to the National Superconducting Cyclotron Laboratory (NSCL) fragmentation facility in order to provide exotic rare-isotope beams, not available at the Isotope Separation On-Line facilities, in the several-MeV/u energy range. The first stage of the NSCL reaccelerator complex, consisting of an EBIT charge breeder, a room-temperature radiofrequency quadrupole (RFQ) accelerator, and superconducting linear accelerator modules, has been completed and is being put into operation. Commissioning of the EBIT has started by extracting charge-bred residual gas ions, ions created from a Ne gas jet directed across the EBIT's electron beam and ions captured from an external test ion source. Charge-bred ions from the Ne gas jet have been extracted as a pulse and accelerated through the RFQ and the two cryomodules.

  1. RF-Plasma Source Commissioning in Indian Negative Ion Facility

    SciTech Connect (OSTI)

    Singh, M. J.; Bandyopadhyay, M.; Yadava, Ratnakar; Chakraborty, A. K. [ITER- India, Institute for Plasma Research, A-29, Sector 25, GIDC, Gandhinagar, Gujrat (India); Bansal, G.; Gahlaut, A.; Soni, J.; Kumar, Sunil; Pandya, K.; Parmar, K. G.; Sonara, J. [Institute for Plasma Research, Bhat Gandhinagar, Gujrat (India); Kraus, W.; Heinemann, B.; Riedl, R.; Obermayer, S.; Martens, C.; Franzen, P.; Fantz, U. [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstrasse 2, D-85748 Garching (Germany)

    2011-09-26

    The Indian program of the RF based negative ion source has started off with the commissioning of ROBIN, the inductively coupled RF based negative ion source facility under establishment at Institute for Plasma research (IPR), India. The facility is being developed under a technology transfer agreement with IPP Garching. It consists of a single RF driver based beam source (BATMAN replica) coupled to a 100 kW, 1 MHz RF generator with a self excited oscillator, through a matching network, for plasma production and ion extraction and acceleration. The delivery of the RF generator and the RF plasma source without the accelerator, has enabled initiation of plasma production experiments. The recent experimental campaign has established the matching circuit parameters that result in plasma production with density in the range of 0.5-1x10{sup 18}/m{sup 3}, at operational gas pressures ranging between 0.4-1 Pa. Various configurations of the matching network have been experimented upon to obtain a stable operation of the set up for RF powers ranging between 25-85 kW and pulse lengths ranging between 4-20 s. It has been observed that the range of the parameters of the matching circuit, over which the frequency of the power supply is stable, is narrow and further experiments with increased number of turns in the coil are in the pipeline to see if the range can be widened. In this paper, the description of the experimental system and the commissioning data related to the optimisation of the various parameters of the matching network, to obtain stable plasma of required density, are presented and discussed.

  2. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    E-Print Network [OSTI]

    Mills, Evan

    2010-01-01

    Case for Energy Management in High-Tech Industries." Energy35 HIGH-TECH FACILITIES: THE COMMISSIONING MOTHERand opportunities for high-tech facilities such as labs,

  3. Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process

    Broader source: Energy.gov [DOE]

    Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission

  4. Using Show Homes (and Sponsorships) to Persuade Commissioning Relevancy and Factory Crafted High Performance Modular Homes

    E-Print Network [OSTI]

    Thomas-Rees, S.; Chasar, D.; Beal, D.; Chandra, S.

    2007-01-01

    manufacturing quality assurance. This paper aims to provide a case study of commissioned, performance measure that justify cost for these demonstration project and "live" show homes....

  5. Atoms for peace and war, 1953-1961: Eisenhower and the Atomic Energy Commission

    SciTech Connect (OSTI)

    Hewlett, Richard G.; Holl, Jack M.

    1989-12-01

    This third volume in the official history of the U.S. Atomic Energy Commission covers the years of the Eisenhower Administration.

  6. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    E-Print Network [OSTI]

    Mills, Evan

    2010-01-01

    and today generally not monetized; We assume energyCommissioning is today used to save energy in ordinaryemissions in buildings today. Energy savings tend to persist

  7. The Role of Public Utility Commissions in Energy Efficiency Program Delivery

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), addresses the role of public utility commissions in energy efficiency program delivery. Presented on August 31, 2011.

  8. A history of the United States Atomic Energy Commission, 1952-1960: Volume 3

    SciTech Connect (OSTI)

    Hewlett, R.G.; Holl, J.M.

    1987-01-01

    This is a detailed historical account of the activities and policies of the Atomic Energy Commission during the Eisenhower and Kennedy administrations. 6 figs. (DWL)

  9. Report to Congress:Impacts of the Federal Energy Regulatory Commission...

    Office of Environmental Management (EM)

    Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design." Report to Congress:Impacts...

  10. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency

    E-Print Network [OSTI]

    916 alifornia. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Resources Code Section 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name cogeneration steam to aid in an enhanced oil recovery proc certified by the Energy Commission ,in May 1987, has

  11. STATE OF CALIFORNIA --NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    STATE OF CALIFORNIA --NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov Energy Partnership Program Temporary Suspension of Technical Assistance Program The Energy Commission is temporarily suspending technical

  12. STATE OF CALIFORNIA --THE NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    Commission is charged with certifying eligible renewable energy resources that may be used by retail sellers to the state's RPS under statute. Many of the RPS-eligible renewable energy resources may qualify for funding through implementing the program. Public Resources Code Section 25747 authorizes the Energy Commission

  13. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency

    E-Print Network [OSTI]

    NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency 1416 9th Street, Room 1311 From: California Energy Commission 1516 9th Street, MS-2000 Sacramento, CA 95814 Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section

  14. STATE OF CALIFORNIA --NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    STATE OF CALIFORNIA -- NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY as eligible renewable energy resources for the RPS and describes how the Energy Commission tracks and verifies COMMISSION 1516 Ninth Street Sacramento, California 95814 Main website: www.energy.ca.gov Notice

  15. Forest Research The Research Agency of the Forestry Commission FR Science Focus

    E-Print Network [OSTI]

    Forest Research The Research Agency of the Forestry Commission FR Science Focus 2011-16 Understanding forests and providing solutions for a sustainable future #12;Forest Research - Who we are Forest Research (FR) is the Forestry Commission's Research Agency and is the UK's foremost body for forest

  16. e-Business W@tch European Commission, DG Enterprise & Industry

    E-Print Network [OSTI]

    . The company operates 36 pulp, paper and packaging mills, 132 converting and packaging plants, 35 wood products1 e-Business W@tch European Commission, DG Enterprise & Industry E-mail: entr publications and resources prepared by e-Business W@tch. The European Commission, Enterprise & Industry

  17. Project Sponsors: California Energy CommissionADVANCED POWER & ENERGY www.apep.uci.edu

    E-Print Network [OSTI]

    Mease, Kenneth D.

    The Renewable Energy Secure Community (RESCO) project is a program sponsored by the California Energy Commission to Renewable Energy Security RESULTS (continued) Further, an energy resource allocation and dispatch model hasProject Sponsors: California Energy CommissionADVANCED POWER & ENERGY PROGRAM www

  18. e-Business W@tch European Commission, DG Enterprise & Industry

    E-Print Network [OSTI]

    industrial group, with a strong base in the West-European market and active in paper and recycled paper1 e-Business W@tch European Commission, DG Enterprise & Industry E-mail: entr publications and resources prepared by e-Business W@tch. The European Commission, Enterprise & Industry

  19. Operability and Results of Retro and On-Going Commission Tools Applied to an Existing Building

    E-Print Network [OSTI]

    Ginestet, S.; Marchio, D.; Morisot, O.

    2004-01-01

    Several tools in the scope of Annex 40 (PECI Model Commissioning Plan and Guide specification, Emma-CTA, IPMVP) have been used to realise the retro and the on-going commissioning of an existing building. The aim of the work was to evaluate...

  20. Retri-Commissioning the Aria Building Using Cite-AHU: An Annex 40 Collaboration

    E-Print Network [OSTI]

    Castro, N.; Vaezi-Nejad, H.

    2004-01-01

    to develop a service tool called CITE-AHU, an automated commissioning tool for air-handling units. The work was carried out as part of an IEA Annex 40 research project and included the retro-commissioning of a real building in Paris as a field test...

  1. California Energy Commission Alternative and Renewable Fuel and Vehicle Technology Program

    E-Print Network [OSTI]

    California at Davis, University of

    1 California Energy Commission Alternative and Renewable Fuel and Vehicle Technology Program infrastructure awards ($83,467,422) b. Fuel standards development ($4,001,990) c. Demonstration projects ($8,489,590 was provided by the Energy Commission.) Total anticipated project match is $2.7 million. ABAG will contract

  2. Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Volume 2, Session 3A--Session 4B

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The 1994 Symposium on Valve and Pump Testing, jointly sponsored by the Board of Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the Nuclear Regulatory Commission, provides a forum for the discussion of current programs and methods for inservice testing and motor-operated valve testing at nuclear power plants. The symposium also provides an opportunity to discuss the need to improve that testing in order to help ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants results in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants. Individual papers have been cataloged separately.

  3. Proceedings of the Third NRC/ASME Symposium on Valve and Pump Testing. Session 1A--Session 2C: Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The 1994 Symposium on Valve and Pump Testing, jointly sponsored by the Board of Nuclear Codes and Standards of the American Society of Mechanical Engineers and by the Nuclear Regulatory Commission, provides a forum for the discussion of current programs and methods for inservice testing and motor-operated valve testing at nuclear power plants. The symposium also provides an opportunity to discuss the need to improve that testing in order to help ensure the reliable performance of pumps and valves. The participation of industry representatives, regulators, and consultants results in the discussion of a broad spectrum of ideas and perspectives regarding the improvement of inservice testing of pumps and valves at nuclear power plants. This document, Volume 1, covers sessions 1A through session 2C. The individual papers have been cataloged separately.

  4. Report to the Legislature on the California Energy Commission's Geothermal Development Grant Program for Local Governments

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This report documents the California Energy Commission's administration of its Geothermal Development Grant Program for Local Governments. The Energy Commission established this program as a result of the passage of Assembly Bill 1905 (Bosco) in 1980. This legislation established the mechanism to distribute the state's share of revenues received from the leasing of federal mineral reserves for geothermal development. The federal government deposits these revenues in the Geothermal Resources Development Account (GRDA) created by AB 1905. The state allocates funds from the GRDA to the California Parklands and Renewable Resources Investment Fund, the counties of origin where the federal leases are located, and the Energy Commission. The legislation further directs the Energy Commission to disburse its share as grants to local governments to assist with the planning and development of geothermal resources. Activities which are eligible for funding under the Energy Commission's grant program include resource development projects, planning and feasibility studies, and activities to mitigate the impacts of existing geothermal development.

  5. Commissioning of the Cryogenic System for the ATLAS Superconducting Magnets

    E-Print Network [OSTI]

    Delruelle, N; Bradshaw, T; Haug, F; ten Kate, H H J; Passardi, Giorgio; Pengo, R; Pezzetti, M; Pirotte, O; Rochford, J

    2006-01-01

    The paper describes the test results of the helium cryoplant for the superconducting magnets of the ATLAS particle detector at CERN. It consists of two refrigerators used in common by all the magnets and of two proximity cryogenic systems (PCS) interfacing respectively the toroids and the central solenoid. Emphasis is given to the commissioning of the refrigerators: the main unit of 6 kW equivalent capacity at 4.5 K and the thermal shield refrigerator providing 20 kW between 40 K and 80 K. The first unit is used for refrigeration at 4.5 K and for the cooling of three sets of 20 kA current leads, while the second one provides, in addition to the 20 kW refrigeration of the thermal shields, 60 kW for the cool-down to 100 K of the 660 ton cold mass of the magnets. The tests, carried out with the equipment in the final underground configuration, are extended to the PCS that includes the large liquid helium centrifugal pumps (each providing 1.2 kg/s) for forced-flow cooling of the magnets and the complex distributi...

  6. Report of the task force on SSC commissioning and operations

    SciTech Connect (OSTI)

    1985-07-01

    In 1985 January a Taskforce was organized to study the impact of magnet design on the commissioning and operation of the SSC. The results of the study, in the form of this report, are intended as one of several sources of input for the Magnet Type Selection Committee. Other major input will come from the Magnet Taskforce, the Test String Taskforce, the Cost Estimating Taskforce, and other study groups. All of these efforts will culminate in a magnet type selection, after which concentrated R&D on the selected magnet can commence. The study began with a one-week workshop, held on the UC Berkeley campus in 1985 January 14--18. An interim report of the Taskforce, based on the results of the Workshop, was published on 1985 January 28 (SSC-05). With very few exceptions, the work of the Taskforce was carried out by the participants in the Workshop, both during the workshop and in the subsequent weeks. This report is the collective effort of that group, whose very substantial contribution of time, effort, and thought is gratefully acknowledged.

  7. Disposal of Specific Articles Containing Radioactive Materials

    E-Print Network [OSTI]

    Jia, Songtao

    Am-241 3. NRC: United States Nuclear Regulatory Commission 4. Sodium Iodide (NaI) Detector: Uses. Disposal of these signs is governed by United States Nuclear Regulatory Commission (NRC) regulations, 10

  8. DRAFT FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES

    Broader source: Energy.gov [DOE]

    The Commission has reviewed comments received during the public comment period and revised its draft Final Report Volumes 1 and 2 for final consideration and approval. The revised version of the draft Final Report is available for download below. A public conference call has been set for 1:00 pm, Oct 23rd to discuss the comments received, to receive additional public comment, and to approve the final report. Further details regarding the conference call can be found here and in the Federal Register. Section 319 of the Consolidated Appropriations Act, 2014 (Public Law No. 113-76) directed the Secretary of Energy to establish the Commission to Review the Effectiveness of the National Energy Laboratories. The Commission was charged with reviewing the 17 Department of Energy (DOE) National Laboratories. It was established in May 2014 and held monthly meetings from July 2014 to July 2015. Congress directed the Commission to evaluate the laboratories in terms of their alignment with the Departments strategic priorities, duplication, ability to meet current and future energy and national security challenges, size, and support of other Federal agencies. The Commission was also to review the efficiency and effectiveness of the laboratories, including assessing overhead costs and the impact of DOEs oversight and management approach. Lastly, Congress had several specific questions related to the use of laboratory directed research and development (LDRD) such as the effectiveness of the Departments oversight approach and the extent to which LDRD funding supports recruiting and retention of qualified staff. The Commission separated its charge into two phases. Phase 1 focused on the mission and strategic planning of the laboratories and Phase 2 targets the operation and oversight of the laboratory system. LDRD as it relates to the issues outlined above was considered in both phases of the Commissions task. The Commission issued an Interim Report in February 2015 with its preliminary observations and recommendations.

  9. FERC Approves Two California Market Settlements The Federal Energy Regulatory Commission (FERC) took another step toward resolution of the issues

    E-Print Network [OSTI]

    Laughlin, Robert B.

    at the Commission's interest rate through Dec. 31, 2007. Strategic will allow the California Power Exchange (Cal

  10. Final Report for the California Energy Commission and the California Institute for Energy Efficiency. This report was prepared as a result of work sponsored by the California Energy Commission (Commission). It does not

    E-Print Network [OSTI]

    Processes of an Information Monitoring and Diagnostic System Prototype CEC Project Manager: Joseph Wang CIEELBNL-44453 CD-429 Final Report for the California Energy Commission and the California Institute for Energy Efficiency. This report was prepared as a result of work sponsored by the California Energy

  11. Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on Americas Nuclear Future

    SciTech Connect (OSTI)

    Williams, Laura S.

    2011-05-25

    To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

  12. On the asymptotics of dimers on tori

    E-Print Network [OSTI]

    Richard W. Kenyon; Nike Sun; David B. Wilson

    2015-11-09

    We study asymptotics of the dimer model on large toric graphs. Let $\\mathbb L$ be a weighted $\\mathbb{Z}^2$-periodic planar graph, and let $\\mathbb{Z}^2 E$ be a large-index sublattice of $\\mathbb{Z}^2$. For $\\mathbb L$ bipartite we show that the dimer partition function on the quotient $\\mathbb{L}/(\\mathbb{Z}^2 E)$ has the asymptotic expansion $\\exp[A f_0 + \\text{fsc} + o(1)]$, where $A$ is the area of $\\mathbb{L}/(\\mathbb{Z}^2 E)$, $f_0$ is the free energy density in the bulk, and $\\text{fsc}$ is a finite-size correction term depending only on the conformal shape of the domain together with some parity-type information. Assuming a conjectural condition on the zero locus of the dimer characteristic polynomial, we show that an analogous expansion holds for $\\mathbb{L}$ non-bipartite. The functional form of the finite-size correction differs between the two classes, but is universal within each class. Our calculations yield new information concerning the distribution of the number of loops winding around the torus in the associated double-dimer models.

  13. Evaluation of select heat and pressure measurement gauges for potential use in the NRC/OECD High Energy Arc Fault (HEAF) test program.

    SciTech Connect (OSTI)

    Lopez, Carlos; Wente, William Baker; Figueroa, Victor G.

    2014-01-01

    In an effort to improve the current state of the art in fire probabilistic risk assessment methodology, the U.S. Nuclear Regulatory Commission, Office of Regulatory Research, contracted Sandia National Laboratories (SNL) to conduct a series of scoping tests to identify thermal and mechanical probes that could be used to characterize the zone of influence (ZOI) during high energy arc fault (HEAF) testing. For the thermal evaluation, passive and active probes were exposed to HEAF-like heat fluxes for a period of 2 seconds at the SNLs National Solar Thermal Test Facility to determine their ability to survive and measure such an extreme environment. Thermal probes tested included temperature lacquers (passive), NANMAC thermocouples, directional flame thermometers, modified plate thermometers, infrared temperature sensors, and a Gardon heat flux gauge. Similarly, passive and active pressure probes were evaluated by exposing them to pressures resulting from various high-explosive detonations at the Sandia Terminal Ballistic Facility. Pressure probes included bikini pressure gauges (passive) and pressure transducers. Results from these tests provided good insight to determine which probes should be considered for use during future HEAF testing.

  14. STATE OF CALIFORNIA --THE RESOURCES AGENCY Arnold Schwarzenegger, Governor CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    Kammen, Daniel M.

    1 STATE OF CALIFORNIA -- THE RESOURCES AGENCY Arnold Schwarzenegger, Governor CALIFORNIA ENERGY efficiency standards, resource acquisition, energy security, and other related matters. Litigation COMMISSION 1516 Ninth Street Sacramento, California 95814 WEBSITES Main website: www.energy.ca.gov Children

  15. STATE OF CALIFORNIA --THE NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    #12;are to conserve resources, protect the environment, ensure energy reliability, enhance the stateSTATE OF CALIFORNIA -- THE NATURAL RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION 1516 Ninth Street Sacramento, California 95814 Main website: www.energy

  16. FINAL BIOLOGICAL OPINION AGENCY: U. S. Federal Energy Regulatory Commission, Washington, D. C.

    E-Print Network [OSTI]

    Hydroelectric Project (P-2153-012) CONSULTATION CONDUCTED BY: National Marine Fisheries Service, Southwest) for the Santa Felicia Hydroelectric Project, on Piru Creek, Los Angeles County. The Commission proposes to issue

  17. Project Programming and Commissioning as a Risk Mitigation and Threat Analysis Tool

    E-Print Network [OSTI]

    Weiss, M. L.

    2006-01-01

    beyond traditional disciplines including risk/threat analysis and mitigation programs. This paper discusses the growing trend of using a commissioning approach as a documentation process for the validation requirements, which are documented in the study...

  18. The Business and Technical Case for Continuous Commissioning for Enhanced Building Operations

    E-Print Network [OSTI]

    Verdict, M.

    2006-01-01

    problems, improve comfort, optimize energy use, and identify retrofits in existing commercial and institutional buildings, and central plant facilities. It is also known as retro-commissioning. A summary of the Energy Systems Laboratory (ESL) experience...

  19. Norwegian National Program for Lifetime Commissioning and Energy Efficient Operation of Buildings

    E-Print Network [OSTI]

    Novakovic, V.; Djuric, N.; Holst, J.; Frydenlund, F.

    2006-01-01

    The project Life-Time Commissioning for Energy Efficient Operation of Buildings is actually a network of industrial companies, private and public entities, and R&D organizations. The overall objective of the project is to contribute...

  20. Continuous Commissioning and Energy Management Control Strategies at Alamo Community College District

    E-Print Network [OSTI]

    Martinez, J.; Verdict, M.; Baltazar, J.C.

    2008-01-01

    This paper presents an overview of energy savings through the optimization of facility Heating, Ventilation, and Air Conditioning (HVAC) systems for the college campuses of the Alamo Community College District. This Continuous Commissioning process...

  1. Retro-Commissioning and Improvement for District Heating and Cooling System Using Simulation

    E-Print Network [OSTI]

    Shingu, H.; Nakajima, R.; Yoshida, H.; Wang, F.

    2006-01-01

    In order to improve the energy performance of a district heating and cooling (DHC) system, retro-commissioning was analyzed using visualization method and simulation based on mathematical models, and improved operation schemes were proposed...

  2. Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy's Technical Assistance Program and SEE Action hosted this webinar on August 30, 2012, on retro-commissioning for energy efficiency in commercial buildings.

  3. Final Report on Retrospective Testing and Application of an Automated Building Commissioning Analysis Tool (ABCAT)

    E-Print Network [OSTI]

    Bynum, John; Lin, Guanjing; Claridge, David

    2009-01-01

    with diagnostic techniques is such a simple and cost efficient tool, which can continuously monitor whole building energy consumption after commissioning, warn operation personnel when an HVAC system problem has increased energy consumption, and assist them...

  4. Using Remote Control Systems for the Re-Commissioning of Heating Plants of School Building

    E-Print Network [OSTI]

    Vaezi-Nejad, H.; Detaille, C.; Jandon, M.; Bruyat, F.

    2004-01-01

    The objective of this work is to develop a semi-automatic commissioning tool that can be implemented in Remote Control Systems to help building operators test the performance of heating plants in school buildings. The work was carried out...

  5. Impacts of Modeled Recommendations of the National Commission on Energy Policy

    Reports and Publications (EIA)

    2005-01-01

    This report provides the Energy Information Administration's analysis of those National Commission on Energy Policy (NCEP) energy policy recommendations that could be simulated using the National Energy Modeling System (NEMS).

  6. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    E-Print Network [OSTI]

    Mills, Evan

    2010-01-01

    energy-efficiency measures, commissioning savings are oftenefficiency measures, it has a cost, associated savings, andSavings do not last, especially for soft measures that can be and often are defeated Risks to Energy-Efficiency

  7. Study on Commissioning Process for Control Logic of Thermal Storage System

    E-Print Network [OSTI]

    Shioya, M.; Tsubaki, M.; Nakahara, N.

    2004-01-01

    and measurements of the control output, the CLT can detect faults relating to operation. The present paper reports the result of commissioning of a heat exchanger secondary control in a thermal storage system in an actual building using the CLT....

  8. Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Technical Assistance Program and SEE Action hosted this webinar on August 30, 2012, on retro-commissioning for energy efficiency in commercial buildings.

  9. Commissioning-Oriented Building Loads Calculations. Application to the CA-MET Building in Namur (Belgium)

    E-Print Network [OSTI]

    Adam, C.; Andre, P.; Aparecida Silva, C.; Hannay, J.; Lebrun, J.

    2004-01-01

    The parallel use of whole building simulation and monitoring of building energy consumptions (heating, cooling, lighting and other electricity consumptions) represents a potential high-level commissioning tool in order to verify, either as a one...

  10. Commissioning and Start Up of a 110 MegaWatt Cogeneration Facility

    E-Print Network [OSTI]

    Good, R.

    1988-01-01

    "In December of 1987, Union Carbide successfully brought on line a 110,000 KVA combined cycle cogeneration facility. The construction, commissioning and start up of this complex facility was accomplished in a remarkably short twelve months...

  11. United States Nuclear Regulatory

    E-Print Network [OSTI]

    United States Nuclear Regulatory Commission United States Department of Energy United States.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: DISTRIBUTION@nrc.gov Facsimile: 301; and Commission papers and their attachments. NRC publications in the NUREG series, NRC regulations, and Title 10

  12. BEMS-Assisted Seasonal Functional Performance Testing in the Initial Commissioning of Kista Entre and Katsan

    E-Print Network [OSTI]

    Isakson, P.; Wetterstrom, P.; Carling, P.

    2004-01-01

    detect and diagnose energy and other performance problems with building operations [1]. However, in Sweden the assessment of seasonal performance in commissioning typically uses trend-data from only a few days. Our hypothesis is that monitoring...-ASSISTED SEASONAL FUNCTIONAL PERFORMANCE TESTING IN THE INITIAL COMMISSIONING OF KISTA ENTR AND KATSAN Per Isakson*, Per Wetterstrm** and Pr Carling*** * Building Sciences KTH, Stockholm SWEDEN. per.isakson@byv.kth.se ** Vasakronan, Stockholm, SWEDEN...

  13. Finding investment criteria for monitoring based commissioning (MBCx) services- focus group evidence from Finland

    E-Print Network [OSTI]

    Laitala, A.

    2012-01-01

    ?investment?criteria?for? monitoring?based?commissioning? (MBCx)?services? ? focus?group?evidence?from?Finland Ari?Laitala Aalto?University,?Finland School?of?Engineering Department?of?Real?Estate,?Planning?and?Geoinformatics 12.11.2012 1Ari?Laitala?ICEBO?2012 Content I...?VTT:?Commissioning? services,?supporting? applications?and? infrastructure?environment Building? automation? information Maintenance? manuals?etc. Energy?inspection? information Weather? prognoses Building?stock? information Diagnostics,?analyses,? calculation...

  14. Lessons Learned from Continuous Commissioning of the Robert E. Johnson State Office Building, Austin, TX

    E-Print Network [OSTI]

    Bynum, J.; Claridge, D. E.

    2008-09-22

    or 5.6% annual whole building energy savings based on a DOE-2 simulation analysis. Three main lessons were learned from the experience with the Robert E. Johnson building: The traditional design-construction-operation team must include... as the basis of this report. A special thanks to Dennis Feary of the General Service Commission of Austin, Texas, and Pam Groce and Felix Lopez of the State Energy Conservation Office. Page 3 of 6 Lessons Learned from Continuous Commissioning 1...

  15. Initial and Continuous Commissioning of Building Automation and Control Systems (BACS) -Preview EN ISO 16484-

    E-Print Network [OSTI]

    Kranz, H. R.

    2008-01-01

    21 hans@kranz.com INITIAL AND CONTINUOUS COMMISSIONING OF BUILDING AUTOMATION AND CONTROL SYSTEMS (BACS) - PREVIEW EN ISO 16484 - Did you ever think about: ?why are our buildings so dumb?? The simple answer might be: because we have a... lack in commissioning. The car industry is introducing the ?Diagnosis plug? ? can you imagine this in our industry? We are missing standards, right? Professional building owners and facility managers require system solutions featuring integrated...

  16. NUREG-1575, Supp. 1 EPA 402-R-09-001

    E-Print Network [OSTI]

    Agency Nuclear Regulatory Commission January 2009 #12;MARSAME DISCLAIMER This supplement was developed of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC

  17. Uncertainties in the Anti-neutrino Production at Nuclear Reactors

    E-Print Network [OSTI]

    Djurcic, Zelimir

    2009-01-01

    1996. [41] US Nuclear Regulatory Commission, NRC Sta? Posi-by the US Nuclear Regulatory Commission in a discus- sion on

  18. Response to "Analysis of the Treatment, by the U.S. Department of Energy, of the FEP Hydrothermal Activity in the Yucca Mountain Performance Assessment" by Yuri Dublyansky

    E-Print Network [OSTI]

    Houseworth, J.E.

    2010-01-01

    Press. NRC (U.S. Nuclear Regulatory Commission) 2003. YuccaD.C. : U.S. Nuclear Regulatory Commission, Office of Nuclear

  19. Coastal Commission funds projects at UCSC Arboretum and Seymour SANTA CRUZ, CA--The California Coastal Commission has awarded grants to fund

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Coastal Commission funds projects at UCSC Arboretum and Seymour Center SANTA CRUZ, CA Santa Cruz, one at the Arboretum and another at the Seymour Center at Long Marine Laboratory. The UCSC. At the Seymour Marine Discovery Center, a $9,370 grant will fund efforts to expand the center's capacity to serve

  20. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect (OSTI)

    2012-01-01

    Preamble The Blue Ribbon Commission on Americas Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commissions findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.