National Library of Energy BETA

Sample records for tory commission nrc

  1. UNITED STATES NUCLEAR REGUtiTORY COMMISSION REGION I C31 PARK...

    Office of Legacy Management (LM)

    REGUtiTORY COMMISSION REGION I C31 PARK AVENUE KlNt OF PRUSSIC. PENNSYLVANIA 1P4D6 z,: P -. : &J L . . : ; .; 3 Do:ket No. 40-2286 Westinqhouse Electric Company Lamp D1vis-i ons ...

  2. DOE Awards Contract for the Nuclear Regulatory Commission (NRC...

    Office of Environmental Management (EM)

    The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities ... protection, waste management, safeguards and security, information management, ...

  3. NRC (Nuclear Regulatory Commission) staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    SciTech Connect (OSTI)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved.

  4. TORIS Data Preparation Guidelines

    SciTech Connect (OSTI)

    Guinn, H.; Remson, D.

    1999-03-11

    The objective of this manual is to present guidelines and procedures for the preparation of new data for the Tertiary Oil Recovery Information System (TORIS) data base. TORIS is an analytical system currently maintained by the Department of Energy's (DOE) Bartlesville Project Office. It uses an extensive field- and reservoir-level data base to evaluate the technical and economic recovery potential of specific crude oil reservoirs.

  5. Commission.

    National Nuclear Security Administration (NNSA)

    ... Requests (301) 903-2180 Len.Myers@nnsa.doe.gov Patricia Smith NRC Reconciliation (301) 903-6860 PatriciaR.Smith@nnsa.doe.gov Homepage: http:nnsa.energy.govnmmss Email: ...

  6. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1986-11-30

    Functional organization charts for the NRC Commission Offices, Divisions, and Branches are presented.

  7. NRC antitrust licensing actions, 1978--1996

    SciTech Connect (OSTI)

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

  8. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) Annual Users Training Meeting was held on May 12-15, 2014, in Denver, Colorado. The NMMSS serves a critical role in the U.S. Government's ability to maintain operational awareness of the inventory, status, and whereabouts of nuclear materials. Accuracy, transparency, and

  9. Commission.

    National Nuclear Security Administration (NNSA)

    November 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and

  10. Commission.

    National Nuclear Security Administration (NNSA)

    5 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Register for the NMMSS 2015 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2015 Annual Users Training Meeting will be held May 11-14, 2015, in Las Vegas, Nevada. There is no registration fee to participate in this invaluable learning opportunity. NMMSS is the U.S. Government's official information system containing current and historical accounting data and

  11. Commission.

    National Nuclear Security Administration (NNSA)

    6 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and commercial

  12. Validation of seismic soil-structure interaction analysis methods: EPRI (Electric Power Research Institute)/NRC (Nuclear Regulatory Commission) cooperation in Lotung, Taiwan, experiments

    SciTech Connect (OSTI)

    Kot, C.A.; Srinivasan, M.G.; Hsieh, B.J.; Tang, Y.K.; Kassawara, R.P.

    1986-10-31

    The cooperative program between NRC/ANL and EPRI on the validation of soil-structure interaction analysis methods with actual seismic response data is described. A large scale-model of a containment building has been built by EPRI/Taipower in a highly seismic region of Taiwan. Vibration tests were performed, first on the basemat before the superstructure was built and then on the completed structure. Since its completion, the structure has experienced many earthquakes. The site and structural response to these earthquakes have been recorded with field (surface and downhole) and structural instrumentation. The validation program involves blind predictions of site and structural response during vibration tests and a selected seismic event, and subsequent comparison between the predictions and measurements. The predictive calculations are in progress. The results of the correlation are expected to lead to the evaluation of the methods as to their conservatisms and sensitivities.

  13. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    Functional organization charts for the NRC Commission Offices, Divisions, Staffs and Branches are presented.

  14. DOE/NRC Forms | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    DOE/NRC Forms U.S. Department of Energy / U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System Links to NMMSS Forms DOE Forms 741 742 742c 749 NRC Forms http://www.nrc.gov/reading-rm/doc-collections/forms/

  15. NRC - regulator of nuclear safety

    SciTech Connect (OSTI)

    1997-05-01

    The U.S. Nuclear Regulatory Commission (NRC) was formed in 1975 to regulate the various commercial and institutional uses of nuclear energy, including nuclear power plants. The agency succeeded the Atomic Energy Commission, which previously had responsibility for both developing and regulating nuclear activities. Federal research and development work for all energy sources, as well as nuclear weapons production, is now conducted by the U.S. Department of Energy. Under its responsibility to protect public health and safety, the NRC has three principal regulatory functions: (1) establish standards and regulations, (2) issue licenses for nuclear facilities and users of nuclear materials, and (3) inspect facilities and users of nuclear materials to ensure compliance with the requirements. These regulatory functions relate to both nuclear power plants and to other uses of nuclear materials - like nuclear medicine programs at hospitals, academic activities at educational institutions, research work, and such industrial applications as gauges and testing equipment. The NRC places a high priority on keeping the public informed of its work. The agency recognizes the interest of citizens in what it does through such activities as maintaining public document rooms across the country and holding public hearings, public meetings in local areas, and discussions with individuals and organizations.

  16. 1996 NRC annual report. Volume 13

    SciTech Connect (OSTI)

    1997-10-01

    This 22nd annual report of the US Nuclear Regulatory Commission (NRC) describes accomplishments, activities, and plans made during Fiscal Year 1996 (FH 1996)--October 1, 1995, through September 30, 1996. Significant activities that occurred early in FY 1997 are also described, particularly changes in the Commission and organization of the NRC. The mission of the NRC is to ensure that civilian uses of nuclear materials in the US are carried out with adequate protection of public health and safety, the environment, and national security. These uses include the operation of nuclear power plants and fuel cycle plants and medical, industrial, and research applications. Additionally, the NRC contributes to combating the proliferation of nuclear weapons material worldwide. The NRC licenses and regulates commercial nuclear reactor operations and research reactors and other activities involving the possession and use of nuclear materials and wastes. It also protects nuclear materials used in operation and facilities from theft or sabotage. To accomplish its statutorily mandated regulatory mission, the NRC issues rules and standards, inspects facilities and operations, and issues any required enforcement actions.

  17. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  18. SQA CGD NRC Vendor Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SQA CGD NRC Vendor Workshop SQA CGD NRC Vendor Workshop This is guidance presented by the United States Nuclear Regulatory Commission. The slides describe the process for design & analysis software. The topics included in these slides are: regulatory framework, programs, requirements, design & dedication guidance, methodology, implementation, attributes and implementation. SQA CGD NRC Vendor Workshop (3.37 MB) More Documents & Publications Commercial Grade Dedication RM Technical

  19. Status of the NRC Decommissioning Program

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L.; Buckley, J.; Pogue, E.; Banovac, K.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.

  20. STATUS OF THE NRC'S DECOMMISSIONING PROGRAM

    SciTech Connect (OSTI)

    Orlando, D. A.; Camper, L. W.; Buckley, J.

    2002-02-25

    On July 21, 1997, the U.S. Nuclear Regulatory Commission published the final rule on Radiological Criteria for License Termination (the License Termination Rule) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submit Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program. It discusses the status of permanently shut-down commercial power reactors, complex decommissioning sites, and sites listed in the Site Decommissioning Management Plan. The paper provides the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including a Standard Review Plan for evaluating plans and information submitted by licensees to support the decommissioning of nuclear facilities and the D and D Screen software for determining the potential doses from residual radioactivity. Finally, it discusses the status of the staff's current efforts to streamline the decommissioning process.

  1. NRC regulatory agenda: Semiannual report, July--December 1996. Volume 15, Number 2

    SciTech Connect (OSTI)

    1997-03-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued semiannually.

  2. NRC Regulatory Agenda quarterly report, July--September 1993. Volume 12, No. 3

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  3. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  4. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  5. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect (OSTI)

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  6. NRC Recommendations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NRC Recommendations NRC Recommendations Presentation on NRC recommendations to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004 to discuss and define role of systems analysis in DOE Hydrogen Program. 3_nas_report_hirsch.pdf (229.89 KB) More Documents & Publications Systems Analysis Workshop Welcome & Introductions Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results 2013 Biological Hydrogen Production Workshop Summary

  7. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  8. Reassessment of the NRC`s program for protecting allegers against retaliation

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    On July 6, 1993, the Nuclear Regulatory Commission`s (NRC`s) Executive Director for Operations established a review team to reassess the NRC`s program for protecting allegers against retaliation. The team evaluated the current system, and solicited comments from various NRC offices, other Federal agencies, licensees, former allegers, and the public. This report is subject to agency review. The report summarizes current processes and gives an overview of current problems. It discusses: (1) ways in which licensees can promote a quality-conscious work environment, in which all employees feel free to raise concerns without fear of retaliation; (2) ways to improve the NRC`s overall handling of allegations; (3) the NRC`s involvement in the Department of Labor process; (4) related NRC enforcement practices; and (5) methods other than investigation and enforcement that may be useful in treating allegations of potential or actual discrimination. Recommendations are given in each area.

  9. Sample Form DOE NRC 740M

    National Nuclear Security Administration (NNSA)

    CONCISE NOTE DOE/NRC FORM 740M (6-2008) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 Estimated burden per response to comply with this mandatory collection request: 45 minutes. This information is required to satisfy the provisions of the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records and FOIA Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,

  10. CHANDRA VIEW OF PULSAR WIND NEBULA TORI

    SciTech Connect (OSTI)

    Bamba, Aya; Mori, Koji; Shibata, Shinpei

    2010-01-20

    The results from a systematic study of 11 pulsar wind nebulae with a torus structure observed with the Chandra X-ray Observatory are presented. A significant observational correlation is found between the radius of the tori, r, and the spin-down luminosity of the pulsars, E-dot. A logarithmic linear fit between the two parameters yields log r = (0.57 +- 0.22) log E-dot-22.3 +- 8.0 with a correlation coefficient of 0.82, where the units of r and E-dot are pc and ergs s{sup -1}, respectively. The value obtained for the E-dot dependency of r is consistent with a square-root law, which is theoretically expected. This is the first observational evidence of this dependency, and provides a useful tool to estimate the spin-down energies of pulsars without direct detections of pulsation. Applications of this dependency to some other samples are also shown.

  11. ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for...

  12. General statement of policy and procedures for NRC enforcement actions: Enforcement policy. Revision 1

    SciTech Connect (OSTI)

    1998-05-01

    This document includes the US Nuclear Regulatory Commission`s (NRC`s or Commission`s) revised General Statement of Policy and Procedure for Enforcement Actions (Enforcement Policy) as it was published in the Federal Register on May 13, 1998 (63 ER 26630). The Enforcement Policy is a general statement of policy explaining the NRC`s policies and procedures in initiating enforcement actions, and of the presiding officers and the Commission in reviewing these actions. This policy statement is applicable to enforcement matters involving the radiological health and safety of the public, including employees` health and safety, the common defense and security, and the environment.

  13. Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC

    SciTech Connect (OSTI)

    Walker, Stuart

    2008-01-15

    The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work together to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions

  14. Operating Experience Level 3, NRC Notice: Antifreeze Agents in Fire Water Sprinkler Systems

    Broader source: Energy.gov [DOE]

    This Operating Experience Level 3 (OE-3) document provides information about safety concerns identified by the Nuclear Regulatory Commission (NRC) that could potentially apply to work performed at Department of Energy (DOE) facilities. These concerns were identified in NRC Information Notice (IN) 2015-02, Antifreeze Agents in Fire Water Sprinkler Systems.

  15. DEPARTMENT OF ENERGY CHARTER FOR THE COMMISSION TO REVIEW THE EFFECTIVENESS OF

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FOR THE COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABO RA TORIES 1. Committee's Official Designation: Commission to Review the Effectiveness of the National Energy Laboratories (Commission on Labs) 2. Authority: This charter establishes the Commission pursuant to section 319 of the Consolidated Appropriations Act, 2014, Public Law No. 113-76. The Commission is being established in accordance with the provisions of the Federal Advisory Committee Act (FACA), as amended, 5

  16. NRC Effort on Regulatory Approaches for Control of Solid Materials

    SciTech Connect (OSTI)

    Huffert, A. M.

    2003-02-27

    The U.S. Nuclear Regulatory Commission's (NRC's) regulations that set standards for protection of the public against radiation do not currently contain specific requirements for the control of solid materials with small or no amounts of radioactivity. Absent a National standard, NRC routinely evaluates, on a case-by-case basis, licensee requests to release solid materials when they are obsolete or no longer useful during operations, or when the facility is being shut down during decommissioning. As part of its continuing examination regarding the control of solid materials, NRC sponsored and received a report from the National Academies' (NA's) National Research Council that reviewed technical bases, policies, and precedents, and made several recommendations for moving forward on this issue. NRC evaluated the NA report and developed a set of options for proceeding with a process for examining approaches for control of solid materials. This paper explains the option that NRC chose and summarizes NRC's technical basis development and related National and international activities.

  17. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    SciTech Connect (OSTI)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2.

  18. Congress, NRC mull utility access to FBI criminal files

    SciTech Connect (OSTI)

    Ultroska, D.

    1984-08-01

    Experiences at Alabama Power Company and other nuclear utilities have promped a request for institutionalizing security checks of personnel in order to eliminated convicted criminals and drug users. The Nuclear Regulatory Commission (NRC), which could provide FBI criminal history information by submitting fingerprints, does not do so, and would require new legislation to take on that duty. Believing that current malevolent employees can be managed with existing procedures, NRC allows criminal background checks only on prospective employees in order to avoid a negative social impact on personnel. Legislation to transfer criminal histories to nuclear facilities is now pending, and NRC is leaning toward a request for full disclosure, partly because of terrorist threats and partly to save manpower time and costs in reviewing case histories.

  19. Enhancement of NRC station blackout requirements for nuclear power plants

    SciTech Connect (OSTI)

    McConnell, M. W.

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) established a Near-Term Task Force (NTTF) in response to Commission direction to conduct a systematic and methodical review of NRC processes and regulations to determine whether the agency should make additional improvements to its regulatory system and to make recommendations to the Commission for its policy direction, in light of the accident at the Fukushima Dai-ichi Nuclear Power Plant. The NTTF's review resulted in a set of recommendations that took a balanced approach to defense-in-depth as applied to low-likelihood, high-consequence events such as prolonged station blackout (SBO) resulting from severe natural phenomena. Part 50, Section 63, of Title 10 of the Code of Federal Regulations (CFR), 'Loss of All Alternating Current Power,' currently requires that each nuclear power plant must be able to cool the reactor core and maintain containment integrity for a specified duration of an SBO. The SBO duration and mitigation strategy for each nuclear power plant is site specific and is based on the robustness of the local transmission system and the transmission system operator's capability to restore offsite power to the nuclear power plant. With regard to SBO, the NTTF recommended that the NRC strengthen SBO mitigation capability at all operating and new reactors for design-basis and beyond-design-basis external events. The NTTF also recommended strengthening emergency preparedness for prolonged SBO and multi-unit events. These recommendations, taken together, are intended to clarify and strengthen US nuclear reactor safety regarding protection against and mitigation of the consequences of natural disasters and emergency preparedness during SBO. The focus of this paper is on the existing SBO requirements and NRC initiatives to strengthen SBO capability at all operating and new reactors to address prolonged SBO stemming from design-basis and beyond-design-basis external events. The NRC initiatives are intended to

  20. Procedures for meeting NRC antitrust responsibilities

    SciTech Connect (OSTI)

    Toalston, A.L.; Messier, M.E.; Lambe, W.M.; Nicholson, P.R.

    1985-05-01

    This report describes the procedures used by NRC staff to implement the antitrust review and enforcement prescribed in Sections 105 and 186 of the Atomic Energy Act of 1954, as amended (the Act), as covered largely by the Commission's Rules and Regulations in 10 CFR Parts 2.101, 2.102, 2.200, 50.33a, 50.80, and 50.90. These procedures set forth the steps and criteria the staff applies in the antitrust review of construction permit and operating license applications and the amendments to those applications that deal with changes in ownership. In addition, the procedures describe how the staff enforces compliance by licensees when antitrust conditions have been appended to construction permits and operating licenses.

  1. Recent NRC research activities addressing valve and pump issues

    SciTech Connect (OSTI)

    Morrison, D.L.

    1996-12-01

    The mission of the U.S. Nuclear Regulatory Commission (NRC) is to ensure the safe design, construction, and operation of commercial nuclear power plants and other facilities in the U.S.A. One of the main roles that the Office of Nuclear Regulatory Research (RES) plays in achieving the NRC mission is to plan, recommend, and implement research programs that address safety and technical issues deemed important by the NRC. The results of the research activities provide the bases for developing NRC positions or decisions on these issues. Also, RES performs confirmatory research for developing the basis to evaluate industry responses and positions on various regulatory requirements. This presentation summarizes some recent RES supported research activities that have addressed safety and technical issues related to valves and pumps. These activities include the efforts on determining valve and motor-operator responses under dynamic loads and pressure locking events, evaluation of monitoring equipment, and methods for detecting and trending aging of check valves and pumps. The role that RES is expected to play in future years to fulfill the NRC mission is also discussed.

  2. DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed

    Office of Environmental Management (EM)

    Compliance | Department of Energy Awards $3.7 Million to Spur Investment in Commercial Energy Code Compliance DOE Awards $3.7 Million to Spur Investment in Commercial Energy Code Compliance June 28, 2016 - 10:02am Addthis Projects aim to provide field-tested data, develop repeatable methodologies for improving compliance and benchmarking The Building Technologies Office (BTO) has selected three projects to receive a total of $3.7 million to study the effects of improving the implementation

  3. Mechanisms of Stochastic Diffusion of Energetic Ions in Spherical Tori

    SciTech Connect (OSTI)

    Ya.I. Kolesnichenko; R.B. White; Yu.V. Yakovenko

    2001-01-18

    Stochastic diffusion of the energetic ions in spherical tori is considered. The following issues are addressed: (I) Goldston-White-Boozer diffusion in a rippled field; (ii) cyclotron-resonance-induced diffusion caused by the ripple; (iii) effects of non-conservation of the magnetic moment in an axisymmetric field. It is found that the stochastic diffusion in spherical tori with a weak magnetic field has a number of peculiarities in comparison with conventional tokamaks; in particular, it is characterized by an increased role of mechanisms associated with non-conservation of the particle magnetic moment. It is concluded that in current experiments on National Spherical Torus eXperiment (NSTX) the stochastic diffusion does not have a considerable influence on the confinement of energetic ions.

  4. Overview of NRC review process

    SciTech Connect (OSTI)

    Tokar, M.; Kane, J.D.

    1989-11-01

    This paper describes the NRC staff`s review of the Prototype License Application Safety Analysis Report (PLASAR) for an Earth-Mounded Concrete Bunker low-level waste disposal facility. Described are the objectives of the review, the resources (e.g., background guidance documents and staff technical disciplines) used, and the products produced. Evaluation conclusions are summarized.

  5. NRC | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    NRC NNSA Receives Excellence Award for Radiological Security Enhancements in Hawaii HONOLULU - At an official event this week, the City and County of Honolulu presented the Department of Energy's (DOE) National Nuclear Security Administration (NNSA) with the Homeland Security Excellence Award for DOE/NNSA's Office of Radiological Security's (ORS) efforts

  6. The Status of NRC Decommissioning Guidance on Intentional Soil Mixing

    SciTech Connect (OSTI)

    Watson, B.A.

    2007-07-01

    In 1997, the U.S. Nuclear Regulatory Commission (NRC) published the License Termination Rule (LTR) as Subpart E of 10 CFR Part 20, which established the license termination criteria for unrestricted use and the controls for restricted use. By 2003, the NRC staff's experience with the LTR revealed some important implementation issues impacting the decommissioning of sites, and these were addressed to the Commission (SECY-03-0069). In 2004, the staff provided the Commission with its analysis of a ninth issue, intentional soil mixing (SECY-04-0035). The Commission approved the staff's recommendations, with comments. In the draft revision of Supplement 1 to NUREG-1757, 'Consolidated Decommissioning Guidance', the staff endorsed the current practice of allowing intentional soil mixing to meet the waste acceptance criteria of offsite disposal facilities and the limited use of this practice to demonstrate compliance with the LTR criteria. The staff recommended including a provision that the staff would consider intentional mixing on a case-by-case basis, provided that the resulting contaminated area footprint is not increased and clean soil from outside the footprint is not mixed with contaminated soil to lower the concentrations. In addition, the staff would consider only those rare cases in which the mixing of clean soil is the only viable option for achieving the dose levels of the LTR. In 2005, the staff issued draft Supplement 1 to NUREG-1757 for public comment. The staff evaluated the public comments, including those from a number of States, and revised the guidance. The staff subsequently summarized the public comments on the draft guidance for the Commission (SECY-06-0143) in early 2006. This paper will discuss the public comments related to intentional mixing, the Commission's comments in its staff requirements memorandum, and the revision to the guidance in NUREG-1757 incorporating the current NRC decommissioning policy for intentional soil mixing. (authors)

  7. ARM - Campaign Instrument - nrc-convair580

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Send Campaign Instrument : National Research Council - Canada CONVAIR 580 (NRC-CONVAIR580) Instrument Categories Airborne Observations Campaigns Indirect and...

  8. DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding March 30, 2010 - 9:57am Addthis The U.S. Department of Energy yesterday filed with the Nuclear Regulatory Commission a response to Petitions to Intervene filed by several parties seeking to oppose the Department's motion to withdraw its license application for a nuclear waste repository at Yucca Mountain. DOE said it is

  9. NRC Licensing Status Summary Report for NGNP

    SciTech Connect (OSTI)

    Moe, Wayne Leland; Kinsey, James Carl

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  10. UPDATING THE NRC GUIDANCE FOR HUMAN FACTORS ENGINEERING REVIEWS.

    SciTech Connect (OSTI)

    O HARA,J.M.; BROWN,W.S.; HIGGINS,J.C.; PERSENSKY,J.J.; LEWIS,P.M.; BONGARRA,J.

    2002-09-15

    The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) aspects of nuclear plants. NUREG-0800 (Standard Review Plan), Chapter 18, ''Human Factors Engineering,'' is the principal NRC staff guidance document. Two main documents provide the review criteria to support the evaluations. The HFE Program Review Model (NUREG-0711) addresses the design process from planning to verification and validation to design implementation. The Human-System Interface Design Review Guidelines (NUREG-0700) provides the guidelines for the review of the HFE aspects of human-system interface technology, such as alarms, information systems, controls, and control room design. Since these documents were published in 1994 and 1996 respectively, they have been used by NRC staff, contractors, nuclear industry organizations, as well as by numerous organizations outside the nuclear industry. Using feedback from users and NRC research conducted in recent years, both documents have been revised and updated. This was done to ensure that they remain state-of-the-art evaluation tools for changing nuclear industry issues and emerging technologies. This paper describes the methodology used to revise and update the documents and summarizes the changes made to each and their current contents. Index Terms for this report are: Control system human factors, Ergonomics, Human factors, Nuclear power generation safety.

  11. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect (OSTI)

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  12. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  13. Evaluation of NRC maintenance team inspection reports for managing aging

    SciTech Connect (OSTI)

    Fresco, A.; Gunther, W.

    1991-01-01

    A nuclear power plant's maintenance program is the principal vehicle through which age-related degradation is managed. Over the past two years, the NRC (Nuclear Regulatory Commission) has evaluated the maintenance program of every nuclear power plant in the U.S. The reports issued on these in-depth team inspections have been reviewed to ascertain the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear power plant systems, structures, and components. Selected results of this review are presented in this paper, including examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue are also discussed. 6 refs., 1 tab.

  14. Recommendations for NEAMS Engagement with the NRC: Preliminary Report

    SciTech Connect (OSTI)

    Bernholdt, David E

    2012-06-01

    The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

  15. Commissioning Specifications

    Office of Energy Efficiency and Renewable Energy (EERE)

    Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and...

  16. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  17. REVIEW OF NRC APPROVED DIGITAL CONTROL SYSTEMS ANALYSIS

    SciTech Connect (OSTI)

    D.W. Markman

    1999-09-17

    Preliminary design concepts for the proposed Subsurface Repository at Yucca Mountain indicate extensive reliance on modern, computer-based, digital control technologies. The purpose of this analysis is to investigate the degree to which the U. S. Nuclear Regulatory Commission (NRC) has accepted and approved the use of digital control technology for safety-related applications within the nuclear power industry. This analysis reviews cases of existing digitally-based control systems that have been approved by the NRC. These cases can serve as precedence for using similar types of digitally-based control technologies within the Subsurface Repository. While it is anticipated that the Yucca Mountain Project (YMP) will not contain control systems as complex as those required for a nuclear power plant, the review of these existing NRC approved applications will provide the YMP with valuable insight into the NRCs review process and design expectations for safety-related digital control systems. According to the YMP Compliance Program Guidance, portions of various NUREGS, Regulatory Guidelines, and nuclear IEEE standards the nuclear power plant safety related concept would be applied to some of the designs on a case-by-case basis. This analysis will consider key design methods, capabilities, successes, and important limitations or problems of selected control systems that have been approved for use in the Nuclear Power industry. An additional purpose of this analysis is to provide background information in support of further development of design criteria for the YMP. The scope and primary objectives of this analysis are to: (1) Identify and research the extent and precedence of digital control and remotely operated systems approved by the NRC for the nuclear power industry. Help provide a basis for using and relying on digital technologies for nuclear related safety critical applications. (2) Identify the basic control architecture and methods of key digital control

  18. NRC Solomons RFQ | Open Energy Information

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NRC Solomons RFQLegal Abstract Example Request for Qualification for Enhanced Use Lease....

  19. Ongoing NRC Efforts on Regulatory Approaches for Control of Solid Materials

    SciTech Connect (OSTI)

    Huffert, A. M.

    2002-02-28

    Specific requirements for the release of solid materials with small or no amounts of radioactivity are not currently contained in 10 CFR Part 20, which constitutes the U.S. Nuclear Regulatory Commission's (NRC's) regulations that set standards for protection of the public against radiation. NRC has approached these matters on a case-by-case basis, in the absence of a national standard for the release of solid materials. Currently, NRC is examining its approach for the control of solid material, including the development of a technical information base for decision-making purposes. As part of this process, NRC has sponsored a National Academy of Sciences (NAS) study to review technical bases, policies, and precedents for controlling the release of solid materials, and to recommend whether NRC should continue its existing approach, establish a national standard by rulemaking, or consider other alternatives. This paper explains the status of NRC's technical basis and the next steps in NRC's decision-making process, as they relate to the NAS study.

  20. NRC regulatory agenda: Semiannual report, January--June 1997. Volume 16, Number 1

    SciTech Connect (OSTI)

    1997-08-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition. The agenda consists of two sections that have been updated through June 30, 1997. Section 1, ``Rules,`` includes (A) rules on which final action has been taken since December 31, 1996, the closing date of the last NRC Regulatory Agenda; (B) rules published previously as proposed rules on which the Commission has not taken final action; (C) rules published as advance notices of proposed rulemaking for which neither a proposed nor final rule has been issued; and (D) unpublished rules on which the NRC expects to take action. Section 2, ``Petitions for Rulemaking,`` includes (A) petitions denied or incorporated into final rules since December 31, 1996; (B) petitions incorporated into proposed rules; and (C) petitions pending staff review.

  1. NRC Leadership Expectations and Practices for Sustaining a High Performing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Organization | Department of Energy NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Leadership Expectations and Practices for Sustaining a High Performing Organization May 16, 2012 Presenter: William C. Ostendorff, NRC Commissioner Topics Covered: NRC Mission Safety Culture NRC Oversight NRC Inspection Program Technical Qualification Continuous Learning NRC Leadership Expectations and Practices for Sustaining a High Performing Organization (4.15

  2. A vast amount of various invariant tori in the Nosé-Hoover oscillator

    SciTech Connect (OSTI)

    Wang, Lei; Yang, Xiao-Song

    2015-12-15

    This letter restudies the Nosé-Hoover oscillator. Some new averagely conservative regions are found, each of which is filled with different sequences of nested tori with various knot types. Especially, the dynamical behaviors near the border of “chaotic region” and conservative regions are studied showing that there exist more complicated and thinner invariant tori around the boundaries of conservative regions bounded by tori. Our results suggest an infinite number of island chains in a “chaotic sea” for the Nosé-Hoover oscillator.

  3. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect (OSTI)

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  4. DOE/NRC F 742 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE/NRC F 742 Form is used for nuclear material control and accountability. MATERIAL BALANCE REPORT (12.55 KB) More Documents & Publications DOE/NRC F 740M Material Balance Report DOE/NRC F 742C

  5. HFE Process Guidance and Standards for potential application to updating NRC guidance

    SciTech Connect (OSTI)

    Jacques Hugo; J. J. Persensky

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

  6. NRC Leadership Expectations and Practices for Sustaining a High...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Leadership Expectations and Practices for Sustaining a High Performing Organization May ...

  7. Use of Barrier Analysis in NRC Staff's Performance Assessment...

    Office of Environmental Management (EM)

    Use of Barrier Analysis in NRC Staff's Performance Assessment Reviews Use of Barrier Analysis in NRC Staff's Performance Assessment Reviews Cynthia Barr and George Alexander United...

  8. Nuclear safety information sharing agreement between NRC and...

    Office of Environmental Management (EM)

    Nuclear safety information sharing agreement between NRC and DOE's Office of Environment, Health, Safety and Security Nuclear safety information sharing agreement between NRC and ...

  9. New security measures are proposed for N-plants: Insider Rule package is issued by NRC

    SciTech Connect (OSTI)

    Not Available

    1984-09-01

    New rules proposed by the Nuclear Regulatory Commission (NRC) will require background investigations and psychological assessments of new job candidates and continual monitoring of the behavior of all power plant workers with access to sensitive areas. Licensees will have to submit an ''access authorization'' program for approval describing how they will conduct these security activities. The employee checks will go back five years to examine credit, educational, and criminal histories. Implementation of the rules could involve the Edison Electric Institute as an intermediary to funnel criminal checks from the Justice Department and FBI. The NRC is also considering a clarification of areas designated as ''vital'' because current designations may be too strict.

  10. Beyond Commissioning

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2004-08-31

    The emerging practice of building commissioning generally provides energy savings of 10% to, in some cases, more than 60% of a building's energy consumption. Moreover, commissioning ensures that equipment and systems are installed and operate properly, providing occupants with the conditions expected. Without commissioning, new buildings can have incorrect equipment installed, devices like fans installed backwards, and unimplemented control algorithms to mention a few deficiencies sometimes found. Existing buildings can have faulty and failed equipment such as clogged filters and coils, stuck dampers, leaky valves, and imbalanced air distribution, as well as overridden controls, improper set points, and incorrect schedules. Commissioning of new and existing buildings helps prevent and alleviate such problems. Yet only a small fraction of commercial buildings has ever been commissioned, and many buildings that have been commissioned have only a fraction of the recommended actions implemented. Time may change this situation or maybe other changes can accelerate the progress of commissioning. Will commissioning continue in the future as it is performed today or must it change? The authors share a vision for how the functions provided by commissioning could change in the future. The paper delves into the roles of automation technology for functional testing, diagnostics, prognostics, data management, asset tracking, and project management in building commissioning. Methods of delivery explored for these capabilities include laptop-, desktop-, and pda-based tools, web-based services, and ubiquitous embedded networked processing. The authors present a vision for how these technologies could change the practice of commissioning and the impacts this could bring for commercial buildings in the U.S. and throughout the world. Potential impacts on building performance, energy consumption, peak power, and occupant satisfaction are examined.

  11. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  12. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  13. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991. Digest 6, Revision 4

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  14. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  15. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1971: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  16. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--March 1991: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  17. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1992: Digest No. 6, Revision No. 7

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  18. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1992: Digest 6, Revision 6

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  19. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992. Digest 6, Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  20. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1991: Digest 6, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC`s Rules of Pratice in 10 CFR Part 2.

  1. NRC TLD direct radiation monitoring network: Progress report, July--September 1997. Volume 17, Number 3

    SciTech Connect (OSTI)

    Struckmeyer, R.

    1998-01-01

    The US Nuclear Regulatory Commission (NRC) Direct Radiation Monitoring Network is operated by the NRC in cooperation with participating states to provide continuous measurement of the ambient radiation levels around licensed NRC facilities, primarily power reactors. Ambient radiation levels result from naturally occurring radionuclides present in the soil, cosmic radiation constantly bombarding the earth from outer space, and the contribution, if any, from the monitored facilities and other man-made sources. The Network is intended to measure radiation levels during routine facility operations and to establish background radiation levels used to assess the radiological impact of an unusual condition, such as an accident. This report presents the radiation levels measured around all facilities in the Network for the third quarter of 1996. A complete listing of the site facilities monitored is included. In some instances, two power reactor facilities are monitored by the same set of dosimeters (e.g., Kewaunee and Point Beach).

  2. Peer Review of NRC Standardized Plant Analysis Risk Models

    SciTech Connect (OSTI)

    Anthony Koonce; James Knudsen; Robert Buell

    2011-03-01

    The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

  3. UPDATING THE NRC STANDARD REVIEW PLAN - CHAPTER 8 - ELECTRICAL SYSTEMS

    SciTech Connect (OSTI)

    SULLIVAN,K.

    2007-06-24

    The Standard Review Plan (SRP) (Reference 2), provides guidance to the regulatory staff of the Nuclear Regulatory Commission (NRC) on performing their safety reviews of applications to construct or operate nuclear power plants, and applications to approve standard designs and sites for nuclear power plants. Chapter 8 of the SRP provides guidance related to the review of station electrical distribution systems described by the applicant in its Design Control Document (DCD) or Safety Analysis Report (SAR). As part of the 2006-2007 SAR update, all sections in this Chapter (8.1, 8.2, 8.3.1, 8.3.2, Appendix 8A, and Appendix 8B) were revised to incorporate new analyses, design approaches, and the lessons learned from the review of the AP 1000 design certification and to assure consistency with the draft Regulatory Guide DG-1145, ''Combined License Applications for Nuclear Power Plants (LWR Edition)''.

  4. Comparative Analysis Between US NRC Requirements and US DOE Orders - 13402

    SciTech Connect (OSTI)

    Chakraborti, Sayan; Stone, Lynn; Hyatt, Jeannette

    2013-07-01

    Small modular reactor (SMR) is a nuclear reactor design approach that is expected to herald in a new era of clean energy in the U.S. These reactors are less than one-third the size of conventional large nuclear power reactors, and have factory-fabricated components that may be transported by rail or truck to a site selected to house a small nuclear reactor. To facilitate the licensing of these smaller nuclear reactor designs, the Nuclear Regulatory Commission (NRC) is in the process of developing a regulatory infrastructure to support licensing review of these unique reactor designs. As part of these activities, the NRC has been meeting with the Department of Energy (DOE) and with individual SMR designers to discuss potential policy, licensing, and key technical differences in SMR designs. It is anticipated by the NRC that such licensing interaction and guidance early in the design process will contribute towards minimizing complexity while adding stability and predictability in the licensing and subsequent regulation of new reactor designs such as SMRs. In conjunction with the current NRC initiative of developing the SMR licensing process, early communication and collaboration in the identification and resolution of any potential technical and licensing differences between NRC requirements and similar requirements applicable at DOE sites would help to expedite demonstration and implementation of SMR technology in the US. In order to foster such early communication, Savannah River Nuclear Solutions (SRNS) has begun taking the first steps in identifying and evaluating potential licensing gaps that may exist between NRC and DOE requirements in siting SMRs at DOE sites. A comparison between the existing NRC regulations for Early Site Permits and the DOE Orders was undertaken to establish the degree of correlation between NRC requirements and compliance methods in place at DOE sites. The ability to use existing data and information to expedite the development of the

  5. Department of Energy and Nuclear Regulatory Commission Increase Cooperation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Advance Global Nuclear Energy Partnership | Department of Energy Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP)

  6. Approach to compliance with the NRC substantially complete containment requirement at the potential repository at Yucca Mountain

    SciTech Connect (OSTI)

    Stahl, D.; Nesbit, S.P.; Berkowitz, L.

    1995-12-01

    An approach to compliance with the U.S. Nuclear Regulatory Commission (NRC) substantially complete containment (SCC) requirement found in the Title 10 Part 60 of the Code of Federal Regulations (CFR) was developed by the Department of Energy (DOE). The approach is consistent with the regulation and is based on a new performance goal of a mean waste-package lifetime well in excess of 1,000 years. The NRC considers that achieving the DOE goal would be a reasonable implementation of the SCC requirement. The NRC has asked several additional questions. The DOE has responded to these questions and the DOE and the NRC are engaged in an ongoing dialog to resolve them.

  7. The impact of NRC guidance on concentration averaging on low level waste sealed source disposal - 11424

    SciTech Connect (OSTI)

    Whitworth, Julia; Stewart, Bill; Cuthbertson, Abigail

    2011-01-20

    As part of its ongoing efforts to revise the Nuclear Regulatory Commission's (NRC) current position on blending to be risk-informed and performance based and its current review of the low-level waste classification codified in 10 CFR 61.55, the Nuclear Regulatory Commission (NRC) has stated that it may review the 1995 'Branch Technical Position on Concentration Averaging and Encapsulation' (BTP), which is still commonly used today. Such a review will have timely advantages, given the lack of commercial disposal availability within the United States for radioactive sealed sources that are in wide beneficial use across the country. The current application of the BTP guidance has resulted in an effective cap on commercial disposal for sources larger than 1.1 TBq (30 Ci). This paper will analyze how the BTP has been implemented with respect to sealed sources, what the implications have been for commercial disposal availability, and whether alternative packaging configurations could be considered for disposal.

  8. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  9. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    SciTech Connect (OSTI)

    Not Available

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities.

  10. Microsoft Word - SmartGrid - NRC Input to DOE Requestrvjcomments.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Regulatory Commission Input to DOE Request for Information/RFI (Federal Register / Vol. 75, No. 180 / Friday, September 17, 2010/Pages 57006-57011 / Notices) / Smart Grid Implementation Input - NRC Contact: Kenn A. Miller, Office of Nuclear Reactor Regulation, 301-415-3152 Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," Page 57010. Nuclear

  11. NRC comprehensive records disposition schedule. Revision 3

    SciTech Connect (OSTI)

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  12. U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Container CARLSBAD, N.M., November 20, 2000 - The U.S. Nuclear Regulatory Commission (NRC) issued a Certificate of Compliance November 2 for the HalfPACT transportation...

  13. NRC Notice: Antifreeze Agents in Fire Water Sprinkler Systems

    Energy Savers [EERE]

    were identified in NRC Information Notice (IN) 2015-02, Antifreeze Agents in Fire Water Sprinkler Systems, (http:pbadupws.nrc.govdocsML1432ML14323A 176.pdf). This IN was...

  14. Microsoft PowerPoint - 5_Pat Smith_NMMSS_2013_Presentation_NRC...

    National Nuclear Security Administration (NNSA)

    Reconciliation Pat Smith PSI NRC Lead NRC Reconciliation NRC Reconciliation requirements per NUREGBR-0007, Rev. 6 All RIS's must submit an MSR (Material Summary Report) ...

  15. 4th Annual NRC Small Business Seminar and Matchmaking Event

    Broader source: Energy.gov [DOE]

    The U.S. NRC regulates commercial and institutional uses of nuclear energy to protect the public health and safety, promote the common defense and security, and protect the environment. Attendees will hear directly from NRC leadership on the vision and priorities of the NRC at its Headquarters in Rockville, Maryland, including current acquisition initiatives and how small businesses can support their mission.

  16. NRC regulatory agenda: Semiannual report, January--June 1995. Volume 14, Number 1

    SciTech Connect (OSTI)

    1995-09-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition. The agenda consists of two sections that have been updated through June 30, 1995. Section 1, ``Rules,`` includes (A) rules on which final action has been taken since December 30, 1994, the closing date of the last NRC Regulatory Agenda; (B) rules published previously as proposed rules on which the Commission has not taken final action; (C) rules published as advance notices of proposed rulemaking for which neither a proposed nor final rule has been issued; and (D) unpublished rules on which the NRC expects to take action. Section 2, ``Petitions for Rulemaking,`` includes (A) petitions denied or incorporated into final rules since December 30, 1994; (B) petitions incorporated into proposed rules; (C) petitions pending staff review, and (D) petitions with deferred action.

  17. NRC Perspectives on Waste Incidental to Reprocessing Consultations and Monitoring - 13398

    SciTech Connect (OSTI)

    McKenney, Christepher A.; Suber, Gregory F.; Felsher, Harry D.; Mohseni, Aby

    2013-07-01

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste (HLW) determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations to assess compliance with NRC regulations in 10 CFR Part 61, Subpart C. The NDAA applies to DOE activities that will remain within the States of South Carolina and Idaho. DOE has chosen to, under DOE Order 435.1, engage in consultation with NRC for similar activities in the State of Washington and New York, however, the NRC has no monitoring responsibilities. In 2007, the NRC developed a draft Final Report for Interim Use entitled, NUREG-1854: NRC Staff Guidance for Activities Related to U.S. Department of Energy Waste Determinations. Since the law was enacted, the DOE and NRC have consulted on three waste determinations within the affected States: (1) the Saltstone Disposal Facility at the Savannah River Site (SRS) within the State of South Carolina in 2005, (2) the INTEC Tank Farm at the Idaho National Laboratory within the State of Idaho in 2006, and (3) the F Tank Farm at SRS in 2011. After the end of consultation and issuance by DOE of the final waste determination, monitoring began at each of these sites, including the development of monitoring plans. In addition to the NDAA sites, DOE has requested NRC consultation support on both individual tanks and the entire C Tank Farm at the Hanford Nuclear Reservation in the State of Washington. DOE also requested consultation of waste determinations performed on the melter and related feed tanks at the West Valley site in New York that would be disposed offsite. In the next few years, NRC and DOE will consult on the last of the NDAA waste determinations for a while, the H Tank Farm waste determination at SRS. DOE may identify other activities in the future but largely

  18. Microsoft PowerPoint - 9_NRC Roundtable Cover_Wensday_NMMSS_2014...

    National Nuclear Security Administration (NNSA)

    and Industry Roundtable Discussion Paul Adam, Wolf Creek Nuclear Operating Corp Suzanne Ani, NRC Brian Horn, NRC

  19. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  20. Results from the NRC AP600 testing program at the Oregon State University APEX facility

    SciTech Connect (OSTI)

    Reyes, J.N. Jr.; Bessette, D.E.; DiMarzo, M.

    1996-03-01

    The Department of Nuclear Engineering at Oregon State University (OSU) is performing a series of confirmatory tests for the U.S. Nuclear Regulatory Commission. These tests are being conducted in the Advanced Plant Experiment (APEX) facility which is a 1/4 length scale and 1/192 volume scale integral system simulation of the Westinghouse Advanced Passive 600 MWe (AP600) plant. The purpose of the testing program is to examine AP600 passive safety system performance, particularly during long term cooling. Thus far, OSU has successfully performed ten integral system tests for the NRC. This paper presents a description of the APEX facility and summarizes the important results of the NRC test program at OSU.

  1. The NRC's SPAR Models: Current Status, Future Development, and Modeling Issues

    SciTech Connect (OSTI)

    Robert F. Buell

    2008-09-01

    Probabilistic risk assessments (PRAs) play an increasingly important role in the regulatory framework of the U.S. nuclear power industry. The Nuclear Regulatory Commission (NRC) relies on a set of plant-specific Standardized Plant Analysis Risk (SPAR) models to provide critical risk-based input to the regulatory process. The Significance Determination Process (SDP), Management Directive 8.3 - NRC Incident Investigation Program, Accident Sequence Precursor (ASP) and Mitigating Systems Performance Index (MSPI) programs are among the regulatory initiatives that receive significant input from the SPAR models. Other uses of the SPAR models include: Screening & Resolution of Generic Safety Issues, License Amendment reviews and Notice of Enforcement Discretion (NOEDs). This paper presents the current status of SPAR model development activities, future development objectives, and issues related to the development, verification and maintenance of the SPAR models.

  2. Commissioning Guidance for ESPCs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMISSIONING GUIDANCE FOR ESPCs CONTENTS Introduction ................................................................................................................................................... 1 Overview of Commissioning in the ESPC Process ...................................................................................... 2 Summary of Roles And Responsibilities In ESPC Project Commissioning ................................................. 3 Key Elements of Commissioning

  3. Microsoft PowerPoint - NRC Managent Persectives_Marissa Bailey...

    National Nuclear Security Administration (NNSA)

    facilities, independent spent fuel storage facilities, decommissioning sites and uranium mills. Foster interactions between NRC licensees and the IAEA as needed. ...

  4. Operating Experience Level 3, NRC Notice: Antifreeze Agents in...

    Broader source: Energy.gov (indexed) [DOE]

    October 2015 OE-3 2015-04: NRC Notice: Antifreeze Agents in Fire Water Sprinkler Systems This Operating Experience Level 3 (OE-3) document provides information about safety...

  5. Proceedings of the 21st DOE/NRC nuclear air cleaning conference; Volume 2, Sessions 9--16

    SciTech Connect (OSTI)

    First, M.W.

    1991-02-01

    The 21st meeting of the Department of Energy/Nuclear Regulatory Commission (DOE/NRC) Nuclear Air Cleaning Conference was held in San Diego, CA on August 13--16, 1990. The proceedings have been published as a two volume set. Volume 2 contains sessions covering adsorbents, nuclear codes and standards, modelling, filters, safety, containment venting and a review of nuclear air cleaning programs around the world. Also included is the list of attendees and an index of authors and speakers. (MHB)

  6. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  7. NRC Reviewer Aid for Evaluating the Human Factors Engineering Aspects of Small Modular Reactors

    SciTech Connect (OSTI)

    OHara J. M.; Higgins, J.C.

    2012-01-13

    Small modular reactors (SMRs) are a promising approach to meeting future energy needs. Although the electrical output of an individual SMR is relatively small compared to that of typical commercial nuclear plants, they can be grouped to produce as much energy as a utility demands. Furthermore, SMRs can be used for other purposes, such as producing hydrogen and generating process heat. The design characteristics of many SMRs differ from those of current conventional plants and may require a distinct concept of operations (ConOps). The U.S. Nuclear Regulatory Commission (NRC) conducted research to examine the human factors engineering (HFE) and the operational aspects of SMRs. The research identified thirty potential human-performance issues that should be considered in the NRC's reviews of SMR designs and in future research activities. The purpose of this report is to support NRC HFE reviewers of SMR applications by identifying some of the questions that can be asked of applicants whose designs have characteristics identified in the issues. The questions for each issue were identified and organized based on the review elements and guidance contained in Chapter 18 of the Standard Review Plan (NUREG-0800), and the Human Factors Engineering Program Review Model (NUREG-0711).

  8. NRC staff review of licensee responses to pressure-locking and thermal-binding issue

    SciTech Connect (OSTI)

    Rathbun, H.J.

    1996-12-01

    Commercial nuclear power plant operating experience has indicated that pressure locking and thermal binding represent potential common mode failure mechanisms that can cause safety-related power-operated gate valves to fail in the closed position, thus rendering redundant safety-related systems incapable of performing their safety functions. In Generic Letter (GL) 95-07, {open_quotes}Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves,{close_quotes} the U.S. Nuclear Regulatory Commission (NRC) staff requested that nuclear power plant licensees take certain actions to ensure that valves susceptible to pressure locking or thermal binding are capable of performing their safety functions within the current licensing bases of the facility. The NRC staff has received summary information from licensees in response to GL 95-07 describing actions they have taken to prevent the occurrence of pressure locking and thermal binding. The NRC staff has developed a systematic process to help ensure uniform and consistent review of licensee submittals in response to GL 95-07.

  9. NRC regualtory agenda. Semiannual report, July 1997--December 1997

    SciTech Connect (OSTI)

    1998-02-01

    The Regulatory Agenda is a semiannual compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and of all petitions for rulemaking that the NRC has received that are pending disposition.

  10. SPEAR3 | Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accelerator Toolbox Parameter list (updated 060605) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt)...

  11. Nuclear Regulatory Commission Authorization Act for fiscal years 1994 and 1995. Introduced in the Senate of the United States, One Hundred Third Congress, Second Session, July 25, 1994

    SciTech Connect (OSTI)

    1994-12-31

    The report addresses S. 2313 a bill to authorize appropriations for the Nuclear Regulatory Commission (NRC) for fiscal years 1994 and 1995. Congressional oversight of the Federal independent regulatory agencies is a fundamental aspect of the Federal regulatory process to ensure that their responsibilities are properly implemented. The bill amends the Atomic Energy Act of 1954 to strengthen and clarify NRC;s authority.

  12. Taking Science to School: NRC Recommendations for K-8 Science...

    Office of Scientific and Technical Information (OSTI)

    Taking Science to School: NRC Recommendations for K-8 Science Back to the OSTI News Listing for 2006 (AIP Bulletin) Based on the most recent research on learning and cognitive ...

  13. Agenda Highlights: 2012 DOE-NRC NMMSS Annual User Training

    National Nuclear Security Administration (NNSA)

    Agenda as of February 2, 2012 Agenda Highlights: 2012 DOE-NRC NMMSS Annual User Training Date Morning Sessions (8:30 am - 12 pm) Afternoon Sessions (1:00 pm - 5:00 pm) Monday May...

  14. Microsoft PowerPoint - 9_NRC Roundtable Cover_Wensday_NMMSS_2014_Powerpoint_TEMPLATE.ppt [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    and Industry Roundtable Discussion Paul Adam, Wolf Creek Nuclear Operating Corp Suzanne Ani, NRC Brian Horn, NRC

  15. Summary of Information Presented at an NRC-Sponsored Low-Power Shutdown Public Workshop, April 27, 1999, Rockville, Maryland

    SciTech Connect (OSTI)

    Wheeler, Timothy A.; Whitehead, Donnie W.; Lois, Erasmia

    1999-07-01

    This report summarizes a public workshop that was held on April 27, 1999, in Rockville, Maryland. The workshop was conducted as part of the US Nuclear Regulatory Commission's (NRC) efforts to further develop its understanding of the risks associated with low power and shutdown operations at US nuclear power plants. A sufficient understanding of such risks is required to support decision-making for risk-informed regulation, in particular Regulatory Guide 1.174, and the development of a consensus standard. During the workshop the NRC staff discussed and requested feedback from the public (including representatives of the nuclear industry, state governments, consultants, private industry, and the media) on the risk associated with low-power and shutdown operations.

  16. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Second Early Site Permit in Just One Month | Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the

  17. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect (OSTI)

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  18. EPRI/NRC-RES fire human reliability analysis guidelines.

    SciTech Connect (OSTI)

    Lewis, Stuart R.; Cooper, Susan E.; Najafi, Bijan; Collins, Erin; Hannaman, Bill; Kohlhepp, Kaydee; Grobbelaar, Jan; Hill, Kendra; Hendrickson, Stacey M. Langfitt; Forester, John Alan; Julius, Jeff

    2010-03-01

    During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support current requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting

  19. NRC Technical Research Program to Evaluate Extended Storage and Transportation of Spent Nuclear Fuel - 12547

    SciTech Connect (OSTI)

    Einziger, R.E.; Compton, K.; Gordon, M.; Ahn, T.; Gonzales, H.; Pan, Y.

    2012-07-01

    Any new direction proposed for the back-end of spent nuclear fuel (SNF) cycle will require storage of SNF beyond the current licensing periods. The Nuclear Regulatory Commission (NRC) has established a technical research program to determine if any changes in the 10 CFR part 71, and 72 requirements, and associated guidance might be necessary to regulate the safety of anticipated extended storage, and subsequent transport of SNF. This three part program of: 1) analysis of knowledge gaps in the potential degradation of materials, 2) short-term research and modeling, and 3) long-term demonstration of systems, will allow the NRC to make informed regulatory changes, and determine when and if additional monitoring and inspection of the systems is necessary. The NRC has started a research program to obtain data necessary to determine if the current regulatory guidance is sufficient if interim dry storage has to be extended beyond the currently approved licensing periods. The three-phased approach consists of: - the identification and prioritization of potential degradation of the components related to the safe operation of a dry cask storage system, - short-term research to determine if the initial analysis was correct, and - a long-term prototypic demonstration project to confirm the models and results obtained in the short-term research. The gap analysis has identified issues with the SCC of the stainless steel canisters, and SNF behavior. Issues impacting the SNF and canister internal performance such as high and low temperature distributions, and drying have also been identified. Research to evaluate these issues is underway. Evaluations have been conducted to determine the relative values that various types of long-term demonstration projects might provide. These projects or follow-on work is expected to continue over the next five years. (authors)

  20. Accident Conditions versus Regulatory Test for NRC-Approved UF6 Packages

    SciTech Connect (OSTI)

    MILLS, G. SCOTT; AMMERMAN, DOUGLAS J.; LOPEZ, CARLOS

    2003-01-01

    The Nuclear Regulatory Commission (NRC) approves new package designs for shipping fissile quantities of UF{sub 6}. Currently there are three packages approved by the NRC for domestic shipments of fissile quantities of UF{sub 6}: NCI-21PF-1; UX-30; and ESP30X. For approval by the NRC, packages must be subjected to a sequence of physical tests to simulate transportation accident conditions as described in 10 CFR Part 71. The primary objective of this project was to relate the conditions experienced by these packages in the tests described in 10 CFR Part 71 to conditions potentially encountered in actual accidents and to estimate the probabilities of such accidents. Comparison of the effects of actual accident conditions to 10 CFR Part 71 tests was achieved by means of computer modeling of structural effects on the packages due to impacts with actual surfaces, and thermal effects resulting from test and other fire scenarios. In addition, the likelihood of encountering bodies of water or sufficient rainfall to cause complete or partial immersion during transport over representative truck routes was assessed. Modeled effects, and their associated probabilities, were combined with existing event-tree data, plus accident rates and other characteristics gathered from representative routes, to derive generalized probabilities of encountering accident conditions comparable to the 10 CFR Part 71 conditions. This analysis suggests that the regulatory conditions are unlikely to be exceeded in real accidents, i.e. the likelihood of UF{sub 6} being dispersed as a result of accident impact or fire is small. Moreover, given that an accident has occurred, exposure to water by fire-fighting, heavy rain or submersion in a body of water is even less probable by factors ranging from 0.5 to 8E-6.

  1. Microsoft PowerPoint - 5_Pat Smith_NMMSS_2013_Presentation_NRC Reconciliation.pptx

    National Nuclear Security Administration (NNSA)

    Reconciliation Pat Smith PSI NRC Lead NRC Reconciliation  NRC Reconciliation requirements per NUREG/BR-0007, Rev. 6  All RIS's must submit an MSR (Material Summary Report) (Form 742, 742C) to NMMSS under the following conditions: - A RIS has a reportable quantity as of their inventory date - A RIS has shipped or received a reportable quantity during the material balance reporting period NRC Reconciliation  All NRC licensees are required to report their physical inventory to NMMSS each

  2. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    SciTech Connect (OSTI)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed on tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to

  3. Agenda Highlights: 2012 DOE-NRC NMMSS Annual User Training

    National Nuclear Security Administration (NNSA)

    Agenda as of February 2, 2012 Agenda Highlights: 2012 DOE-NRC NMMSS Annual User Training Date Morning Sessions (8:30 am - 12 pm) Afternoon Sessions (1:00 pm - 5:00 pm) Monday May 21, 2012 SAMS 7.x Software Training NMMSS Overview Training for New Users Reactor Subcommittee Foreign Obligations Subcommittee Hands-on NMMSS Training Tuesday May 22, 2012 NMMSS/NMMT/LANMAS Plenary Session Program Status NNSA/NRC Management Perspectives Nuclear Nonproliferation Initiatives U.S.-Australian Cooperation

  4. Radioactive Dose Assessment and NRC Verification of Licensee Dose Calculation.

    Energy Science and Technology Software Center (OSTI)

    1994-09-16

    Version 00 PCDOSE was developed for the NRC to perform calculations to determine radioactive dose due to the annual averaged offsite release of liquid and gaseous effluent by U.S commercial nuclear power facilities. Using NRC approved dose assessment methodologies, it acts as an inspector's tool for verifying the compliance of the facility's dose assessment software. PCDOSE duplicates the calculations of the GASPAR II mainframe code as well as calculations using the methodologices of Reg. Guidemore » 1.109 Rev. 1 and NUREG-0133 by optional choice.« less

  5. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This document provides functional organization charts for all NRC Offices and Regions, and their components.

  6. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972-September 1985. Digest No. 4, Revision No. 1

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    This Revision 1 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces earlier editions and supplements and includes appropriate changes reflecting the admendments to the Rules of Practice effective through September 20, 1985.

  7. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990.

  8. Risk-informed inservice test activities at the NRC

    SciTech Connect (OSTI)

    Fischer, D.; Cheok, M.; Hsia, A.

    1996-12-01

    The operational readiness of certain safety-related components is vital to the safe operation of nuclear power plants. Inservice testing (IST) is one of the mechanisms used by licensees to ensure this readiness. In the past, the type and frequency of IST have been based on the collective best judgment of the NRC and industry in an ASME Code consensus process and NRC rulemaking process. Furthermore, IST requirements have not explicitly considered unique component and system designs and contribution to overall plant risk. Because of the general nature of ASME Code test requirements and non-reliance on risk estimates, current IST requirements may not adequately emphasize testing those components that are most important to safety and may overly emphasize testing of less safety significant components. Nuclear power plant licensees are currently interested in optimizing testing by applying resources in more safety significant areas and, where appropriate, reducing measures in less safety-significant areas. They are interested in maintaining system availability and reducing overall maintenance costs in ways that do not adversely affect safety. The NRC has been interested in using probabilistic, as an adjunct to deterministic, techniques to help define the scope, type and frequency of IST. The development of risk-informed IST programs has the potential to optimize the use of NRC and industry resources without adverse affect on safety.

  9. Jennifer Schaefer > NRC Postdoctoral Fellow - National Institute of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Standards and Technology > Center Alumni > The Energy Materials Center at Cornell Jennifer Schaefer NRC Postdoctoral Fellow - National Institute of Standards and Technology Formerly a graduate student with the Archer Group, Jennifer received her PhD in 2014

  10. Commissioning guidance for ESPCs

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Guidance for facility managers describing the commissioning process in Super ESPC contracts and how these contracts can achieve the objective of meeting facility performance requirements.

  11. NUCLEAR REGULATORY COMMISSION

    Office of Environmental Management (EM)

    NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: ...

  12. California Energy Commission

    Broader source: Energy.gov (indexed) [DOE]

    California Energy Commission Quadrennial Water Review Comments - June 19, 2014 Water-Energy Nexus Water and energy systems are inextricably linked -- producing energy uses large ...

  13. DOE Petitions for NRC Review in Yucca Mountain Proceeding

    Broader source: Energy.gov [DOE]

    The United States Department of Energy today filed with the Nuclear Regulatory Commission a petition requesting that the Commission review and reverse an order by the NRC’s Atomic Safety and...

  14. Guidelines for residential commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  15. NRC Transportation Security (Part 73 SNF Update and Part 37 Category...

    Office of Environmental Management (EM)

    NRC Transportation Security (Part 73 SNF Update and Part 37 Category 1 and 2 Materials) NRC Transportation Security (Part 73 SNF Update and Part 37 Category 1 and 2 Materials) PDF...

  16. DOE Makes Filing with NRC in Support OF Authority to Withdraw Yucca Application

    Broader source: Energy.gov [DOE]

    DOE today urged the NRC to conclude that DOE has the legal authority to withdraw the pending Yucca Mountain license application.  DOE argued that the NRC should review and reverse the contrary...

  17. Chapter 9: Commissioning the Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com-

  18. Going the Distance? NRC's Response to the National Academy of Science's Transportation Study

    SciTech Connect (OSTI)

    Easton, E.P.; Bajwa, C.S.

    2008-07-01

    In February 2006, the National Academy of Sciences (NAS) published the results of a 3 1/2-year study, titled Going the Distance, that examined the safety of transporting spent nuclear fuel (SNF) and high level waste (HLW) in the United States. NAS initiated this study to address what it perceived to be a national need for an independent, objective, and authoritative analysis of SNF and HLW transport in the United States. The study was co-sponsored by the U.S. Nuclear Regulatory Commission (NRC), the U.S. Department of Energy (DOE), the U.S. Department of Transportation (DOT), the Electric Power Research Institute and the National Cooperative Highway Research Program. This paper addresses some of the recommendations made in the NAS study related to the performance of SNF transportation casks in long duration fires, the use of full-scale package testing, and the need for an independent review of transportation security prior to the commencement of large scale shipping campaigns to an interim storage site or geologic repository. In conclusion: The NRC believes that the current regulations in 10 CFR Part 71 for the design of SNF and HLW transportation packages provide a very high level of protection to the public for very severe accidents and credible threat scenarios. As recommended by the NAS study, additional studies of accidents involving severe fires have been completed. These studies have confirmed that spent fuel casks would be expected to withstand very severe fires without the release of any fission products from the spent fuel. Additionally, changes in rail operating procedures such as the use of dedicated trains and prohibition on the co-location of SNF and flammable liquids in rail tunnels can further reduce the already low probability of severe rail accident fires involving SNF and HLW. (authors)

  19. 1995 revisions to the DOT/NRC transport regulations and their impact on nuclear power plants

    SciTech Connect (OSTI)

    Grella, A.W.

    1996-10-01

    On September 28, 1995, the U.S. Department of Transportation (DOT) and the U.S. Nuclear Regulatory Commission (NRC) published major amendments to the nuclear transportation regulations of the US. The amendments culminated an approximate 8-year effort of the two agencies to conform US regulations (to the extent practicable) to the international transport standards of the International Atomic Energy Agency (IAEA) Safety Series N. 6, {open_quotes}Regulations For The Safe Transport of Radioactive Material{close_quotes}, 1985 Edition (Revised 1990). This paper identifies the major revisions to the regulations which have taken place and discusses not only their probable future impacts but also identifies certain issues and early impacts which have been emerging since publication of the final rules late in 1995. The discussion is summarized with respect to these impacts and issues on transportation of radioactive material by the nuclear power industry. Many of the revisions which are more minor in nature are also identified. The generic effective date for mandatory compliance with the revised regulations was April 1, 1996, however two of the major revisions of interest to the utilities have later effective dates for mandatory compliance. The use of the so-called {open_quotes}NRC-Certified Type A LSA Packages{close_quotes} are authorized until April 1, 1999 and mandatory compliance with the new radiation protection program requirements of 49 CFR 172 Subpart I is not until October 1, 1997. This paper is based to a large extent on the EPRI report bearing the same title as this paper, which is currently in draft.

  20. A review of NRC staff uses of probabilistic risk assessment

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The NRC staff uses probabilistic risk assessment (PRA) and risk management as important elements its licensing and regulatory processes. In October 1991, the NRC`s Executive Director for Operations established the PRA Working Group to address concerns identified by the Advisory Committee on Reactor Safeguards with respect to unevenness and inconsistency in the staff`s current uses of PRA. After surveying current staff uses of PRA and identifying needed improvements, the Working Group defined a set of basic principles for staff PRA use and identified three areas for improvements: guidance development, training enhancements, and PRA methods development. For each area of improvement, the Working Group took certain actions and recommended additional work. The Working Group recommended integrating its work with other recent PRA-related activities the staff completed and improving staff interactions with PRA users in the nuclear industry. The Working Group took two key actions by developing general guidance for two uses of PRA within the NRC (that is, screening or prioritizing reactor safety issues and analyzing such issues in detail) and developing guidance on basic terms and methods important to the staff`s uses of PRA.

  1. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, appeal board and licensing board decisions, July 1972--June 1996. Digest Number 8

    SciTech Connect (OSTI)

    1997-07-01

    This is the eighth edition of the NRC Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1996 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. Although the Appeal Board was abolished in 1991, Appeal Board precedent, to the extent it is consistent with more recent case law and rule changes, may still be cited. This eighth edition of the Digest replaces earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 1996. The Practice and Procedure Digest was originally prepared by NRC attorneys as an internal research tool. Because of its proven usefulness to those attorneys, it was decided that it might also prove useful to members of the public and practitioners before the NRC. Accordingly, the decision was made to publish the digest and subsequent editions thereof. This current edition of the Digest was prepared by staff members of the Office of General Counsel and the Office of Commission Appellate Adjudication.

  2. Commissioning Plan RM

    Office of Environmental Management (EM)

    ... of a CP review will be used by the DOE Federal Project Director and ultimately the ... (ST-5.3) ST-6 Has the project acquired the services of a qualified commissioning agent? ...

  3. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  4. Retro-Commissioning Program

    Broader source: Energy.gov [DOE]

    To obtain incentives, interested applicants must work with a Retro-Commissioning Service Provider adviser to complete the initial study. Please note that customer eligibility for Focus on Energy ...

  5. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  6. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    SciTech Connect (OSTI)

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  7. Commissioning and Retro-Commissioning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commissioning and Retro-Commissioning Resources Commissioning and Retro-Commissioning Resources To ensure a new building's systems are correctly installed and are operating properly, a commissioning program may be incorporated into all building phases, including design, construction, and operations. Likewise, a retro-commissioning process is used for identifying and improving less-than-optimal energy performance in an existing building's equipment and control systems. State and local governments

  8. Commission Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission Meetings Commission Meetings Meetings of the Commission to Review the Effectiveness of the National Energy Laboratories October 23, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015 The final public meeting of the Commission will begin at 1:00 p.m. on October 23, 2015 in the form of a Conference Call. The tentative meeting agenda includes discussion on the draft Final Report of the Commission. The Commissioners will address comments they

  9. European Commission | Open Energy Information

    Open Energy Info (EERE)

    European Commission Name: European Commission Place: Brussels, Belgium Website: ec.europa.euindexen.htm Coordinates: 50.8503396, 4.3517103 Show Map Loading map......

  10. NRC's 13th Annual Congress highlights the mainstream of recycling

    SciTech Connect (OSTI)

    White, K.M.

    1994-12-01

    The theme of the National Recycling Coalition's (NRC, Washington, DC) recent 13th Annual Congress and Exposition in Portland, OR, was ''Jump into the Mainstream: Recycle,'' which is an action organizers of the show set out to prove is currently happening across this country. Indeed, this year's congress was designed to demonstrate how far recycling has jumped into the mainstream of American life, and show attendees what it will take to make recycling succeed in the future. Lending testament to recycling's increasing visibility, the most dominant topic at this year's show was the creation of national recycling policy. Through this agenda, and other programs that surfaced at the congress, NRC is hoping to move closer to its goal of making recycling as mainstream as taking out the garbage. NRC's board of directors unanimously voted to adopt a draft advocacy message that promotes recycling initiatives at the national level, but rejected a proposed demand-side initiative that would have established post-consumer-content recycling rates for certain materials, with product-specific, minimum-content standards as an alternative method of compliance. The initiative had called for glass, metal, paper, plastic, and wood used in primary and secondary packaging to achieve a 50% post-consumer recycling rate by the year 2000. As an alternative method of compliance, individual companies could meet the following post-consumer, minimum-content standards for products: glass, metal, paper, plastic, and wood packaging: 40% by 2000; newsprint and tissue paper: 50% by 2000; and printing and writing papers: 25% by 2000.

  11. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  12. Recent Updates to NRC Fuel Performance Codes and Plans for Future Improvements

    SciTech Connect (OSTI)

    Geelhood, Kenneth J.

    2011-12-31

    FRAPCON-3.4a and FRAPTRAN 1.4 are the most recent versions of the U.S. Nuclear Regulatory Commission (NRC) steady-state and transient fuel performance codes, respectively. These codes have been assessed against separate effects data and integral assessment data and have been determined to provide a best estimate calculation of fuel performance. Recent updates included in FRAPCON-3.4a include updated material properties models, models for new fuel and cladding types, cladding finite element analysis capability, and capability to perform uncertainty analyses and calculate upper tolerance limits for important outputs. Recent updates included in FRAPTRAN 1.4 include: material properties models that are consistent with FRAPCON-3.4a, cladding failure models that are applicable for loss-of coolant-accident and reactivity initiated accident modeling, and updated heat transfer models. This paper briefly describes these code updates and data assessments, highlighting the particularly important improvements and data assessments. This paper also discusses areas of improvements that will be addressed in upcoming code versions.

  13. Data Quality Assurance Program Plan for NRC Division of Risk Analysis Programs at the INL

    SciTech Connect (OSTI)

    Sattison, Martin B.; Wierman, Thomas E.; Vedros, Kurt G.; Germain, Shawn W. St.; Eide, Steven A.; Sant, Robert L.

    2009-07-01

    The Division of Risk Analysis (DRA), Office of Nuclear Regulatory Research (RES), must ensure that the quality of the data that feed into its programs follow Office of Management and Budget (OMB) and U.S. Nuclear Regulatory Commission (NRC) guidelines and possibly other standards and guidelines used in nuclear power plant risk analyses. This report documents the steps taken in DRAs Data Quality Improvement project (Job Control Number N6145) to develop a Data Quality Assurance Program Plan. These steps were 1. Conduct a review of data quality requirements 2. Review current data programs, products, and data quality control activities 3. Review the Institute of Nuclear Power Operation (INPO) Equipment Performance and Information Exchange (EPIX) data quality programs and characterize the EPIX data quality and uncertainty 4. Compare these programs, products, and activities against the requirements 5. Develop a program plan that provides assurance that data quality is being maintained. It is expected that the Data Quality Assurance Program Plan will be routinely implemented in all aspects of future data collection and processing efforts and that specific portions will be executed annually to provide assurance that data quality is being maintained.

  14. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  15. ATOMIC ENERGY COMMISSION

    Office of Legacy Management (LM)

    ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum responds to your TWX certain information on the above subject. the documentation necessary to answer your available due to the records disposal vailing at the time of release or From records that are available and from disc&ions with most familiar with the transfer operations, &have the current

  16. Microsoft PowerPoint - 8_Peter Habighorst_NRC_Act of 2012-status final 5-12 presentation.ppt [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    Use of NMMSS Data in Support of the American Medical Isotopes Production Act of 2012 Peter Habighorst Nuclear Regulatory Commission Background * Section 3175 of the act requires: - Chairman of NRC, after consulting with other relevant agencies, to submit to Congress by January 2, 2014 a report detailing certain U.S. exports of High Enriched Uranium (HEU)* * Uranium enriched to 20% or more in U-235 2 Information in report * "Current" disposition of U.S. exports of HEU used as fuel or

  17. Implementing 'Continuous Improvement' in the U.S. Nuclear Regulatory Commission's Decommissioning Program

    SciTech Connect (OSTI)

    Orlando, D. A.; Buckley, J. T.; Johnson, R. L.; Gillen, D. M.

    2006-07-01

    The United States Nuclear Regulatory Commission's (US NRC's) comprehensive decommissioning program encompasses the decommissioning of all US NRC licensed facilities, ranging from the termination of routine licenses for sealed sources, to the closure of complex materials sites and nuclear power reactor facilities. Of the approximately 200 materials licenses that are terminated each year, most are routine and require little, if any, remediation to meet the US NRC unrestricted release criteria. However, some present technical and policy challenges that require large expenditures of resources, including a few complex materials sites that have requested license termination under the restricted-use provisions of 10 CFR 20.1403. Fiscal constraints to reduce budgeted resources in the decommissioning program, as well as concerns over the time to complete the decommissioning process have led to actions to improve the program and use resources more efficiently. In addition, the US NRC's Strategic Plan requires efforts to identify and implement improvements to US NRC programs in order to improve efficiency, effectiveness, timeliness, and openness, of the US NRC's activities, while maintaining the necessary focus on safety. Decommissioning regulations, and more recently the analysis of several issues associated with implementing those regulations, also have been significant catalysts for improvements in the decommissioning program. Actions in response to these catalysts have resulted in a program focused on the management of complex sites in a comprehensive, consistent, and risk-informed manner, as opposed to the past practice of focusing on sites deemed to be problematic. This paper describes the current status of the decommissioning of US NRC-licensed nuclear facilities, including an overview of recent decommissioning project completion efforts. It provides a detailed summary of past, current, and future improvements in the US NRC decommissioning program including the

  18. A Guide to Building Commissioning

    SciTech Connect (OSTI)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  19. Canister storage building compliance assessment SNF project NRC equivalency criteria - HNF-SD-SNF-DB-003

    SciTech Connect (OSTI)

    BLACK, D.M.

    1999-08-11

    This document presents the Project's position on compliance with the SNF Project NRC Equivalency Criteria--HNF-SD-SNF-DE-003, Spent Nuclear Fuel Project Path Forward Additional NRC Requirements. No non-compliances are shown The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion.

  20. Social Media and the NRC: What We're Doing, Why We're Doing It...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Social Media and the NRC: What We're Doing, Why We're Doing It, and What Else We Might Do Social Media and the NRC: What We're Doing, Why We're Doing It, and What Else We Might Do ...

  1. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    SciTech Connect (OSTI)

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  2. Use of Circadian Lighting System to improve night shift alertness and performance of NRC Headquarters Operations Officers

    SciTech Connect (OSTI)

    Baker, T.L.; Morisseau, D.; Murphy, N.M.

    1995-04-01

    The Nuclear Regulatory Commission`s (NRC) Headquarters Operations Officers (HOOs) receive and respond to events reported in the nuclear industry on a 24-hour basis. The HOOs have reported reduced alertness on the night shift, leading to a potential deterioration in their on-shift cognitive performance during the early morning hours. For some HOOs, maladaptation to the night shift was also reported to be the principal cause of: (a) reduced alertness during the commute to and from work, (b) poor sleep quality, and (c) personal lifestyle problems. ShiftWork Systems, Inc. (SWS) designed and installed a Circadian Lighting System (CLS) at both the Bethesda and Rockville HOO stations with the goal of facilitating the HOOs physiological adjustment to their night shift schedules. The data indicate the following findings: less subjective fatigue on night shifts; improved night shift alertness and mental performance; higher HOO confidence in their ability to assess event reports; longer, deeper and more restorative day sleep after night duty shifts; swifter adaptation to night work; and a safer commute, particularly for those with extensive drives.

  3. National Energy Commission (China) | Open Energy Information

    Open Energy Info (EERE)

    Commission (China) Jump to: navigation, search Name: National Energy Commission (China) Place: Beijing References: National Energy Commission (China)1 This article is a stub. You...

  4. California State Lands Commission | Open Energy Information

    Open Energy Info (EERE)

    Lands Commission Jump to: navigation, search Logo: California State Lands Commission Name: California State Lands Commission Abbreviation: CSLC Address: 100 Howe Ave., Suite 100...

  5. California Coastal Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Logo: California Coastal Commission Name: California Coastal Commission Address: 45 Fremont Street, Suite 2000 Place: San Francisco,...

  6. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission (25.98 KB) More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from ...

  7. Nuclear safety information sharing agreement between NRC and DOE’s Office of Environment, Health, Safety and Security

    Broader source: Energy.gov [DOE]

    Nuclear safety information sharing agreement between NRC and DOE’s Office of Environment, Health, Safety and Security.

  8. Commissioning a materials research laboratory

    SciTech Connect (OSTI)

    SAVAGE,GERALD A.

    2000-03-28

    This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

  9. Ozone transport commission developments

    SciTech Connect (OSTI)

    Joyce, K.M.

    1995-08-01

    On September 27, 1994, the states of the Ozone Transport Commission (OTC) signed an important memorandum of understanding (MOU) agreeing to develop a regional strategy for controlling stationary sources of nitrogen oxide emissions. Specifically, the states of the Ozone Transport Region, OTR, agreed to propose regulations for the control of NOx emissions from boilers and other indirect heat exchangers with a maximum gross heat input rate of at least 250 million BTU per hour. The Ozone Transport Region was divided into Inner, Outer and Northern Zones. States in the Outer Zone agreed to reduce NOx emissions by 55%. States in the Inner Zone agreed to reduce NOx emissions 65%. Facilities in both zones have the option to emit NOx at a rate no greater than 0.2 pounds per million Btu by May 1, 1999. This option provides fairness for the gas-fired plants which already have relatively low NOx emissions. Additionally, States in the Inner and Outer Zones agreed to reduce their NOx emissions by 75% or to emit NOx at a rate no greater than 0.15 pounds per million BTU by May 1, 2003. The Northern Zone States agree to reduce their rate of NOx emissions by 55% from base year levels by May 1, 2003, or to emit NOx at a rate no greater than 0.2 pounds per million BTU. As part of this MOU, States also agreed to develop a regionwide trading mechanism to provide a cost-effective mechanism for implementing the reductions.

  10. TESTING THE UNIFICATION MODEL FOR ACTIVE GALACTIC NUCLEI IN THE INFRARED: ARE THE OBSCURING TORI OF TYPE 1 AND 2 SEYFERTS DIFFERENT?

    SciTech Connect (OSTI)

    Ramos Almeida, C.; Levenson, N. A.; Radomski, J. T.; Alonso-Herrero, A.; Asensio Ramos, A.; Rodriguez Espinosa, J. M.; Perez Garcia, A. M.; Mason, R.; DIaz-Santos, T.

    2011-04-20

    We present new mid-infrared imaging data for three Type-1 Seyfert galaxies obtained with T-ReCS on the Gemini-South Telescope at subarcsecond resolution. Our aim is to enlarge the sample studied in a previous work to compare the properties of Type-1 and Type-2 Seyfert tori using clumpy torus models and a Bayesian approach to fit the infrared (IR) nuclear spectral energy distributions. Thus, the sample considered here comprises 7 Type-1, 11 Type-2, and 3 intermediate-type Seyferts. The unresolved IR emission of the Seyfert 1 galaxies can be reproduced by a combination of dust heated by the central engine and direct active galactic nucleus (AGN) emission, while for the Seyfert 2 nuclei only dust emission is considered. These dusty tori have physical sizes smaller than 6 pc radius, as derived from our fits. Unification schemes of AGN account for a variety of observational differences in terms of viewing geometry. However, we find evidence that strong unification may not hold and that the immediate dusty surroundings of Type-1 and Type-2 Seyfert nuclei are intrinsically different. The Type-2 tori studied here are broader, have more clumps, and these clumps have lower optical depths than those of Type-1 tori. The larger the covering factor of the torus, the smaller the probability of having a direct view of the AGN, and vice versa. In our sample, Seyfert 2 tori have larger covering factors (C{sub T} = 0.95 {+-} 0.02) and smaller escape probabilities (P{sub esc} = 0.05% {+-} {sup 0.08}{sub 0.03}%) than those of Seyfert 1 (C{sub T} = 0.5 {+-} 0.1; P{sub esc} = 18% {+-} 3%). All the previous differences are significant according to the Kullback-Leibler divergence. Thus, on the basis of the results presented here, the classification of a Seyfert galaxy as a Type-1 or Type-2 depends more on the intrinsic properties of the torus rather than on its mere inclination toward us, in contradiction with the simplest unification model.

  11. Commissioning of NSLS-II

    SciTech Connect (OSTI)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  12. PRELIMINARY Run Shutdown BL Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

  13. US NRC-Sponsored Research on Stress Corrosion Cracking Susceptibility of Dry Storage Canister Materials in Marine Environments - 13344

    SciTech Connect (OSTI)

    Oberson, Greg; Dunn, Darrell; Mintz, Todd; He, Xihua; Pabalan, Roberto; Miller, Larry

    2013-07-01

    At a number of locations in the U.S., spent nuclear fuel (SNF) is maintained at independent spent fuel storage installations (ISFSIs). These ISFSIs, which include operating and decommissioned reactor sites, Department of Energy facilities in Idaho, and others, are licensed by the U.S. Nuclear Regulatory Commission (NRC) under Title 10 of the Code of Federal Regulations, Part 72. The SNF is stored in dry cask storage systems, which most commonly consist of a welded austenitic stainless steel canister within a larger concrete vault or overpack vented to the external atmosphere to allow airflow for cooling. Some ISFSIs are located in marine environments where there may be high concentrations of airborne chloride salts. If salts were to deposit on the canisters via the external vents, a chloride-rich brine could form by deliquescence. Austenitic stainless steels are susceptible to chloride-induced stress corrosion cracking (SCC), particularly in the presence of residual tensile stresses from welding or other fabrication processes. SCC could allow helium to leak out of a canister if the wall is breached or otherwise compromise its structural integrity. There is currently limited understanding of the conditions that will affect the SCC susceptibility of austenitic stainless steel exposed to marine salts. NRC previously conducted a scoping study of this phenomenon, reported in NUREG/CR-7030 in 2010. Given apparent conservatisms and limitations in this study, NRC has sponsored a follow-on research program to more systematically investigate various factors that may affect SCC including temperature, humidity, salt concentration, and stress level. The activities within this research program include: (1) measurement of relative humidity (RH) for deliquescence of sea salt, (2) SCC testing within the range of natural absolute humidity, (3) SCC testing at elevated temperatures, (4) SCC testing at high humidity conditions, and (5) SCC testing with various applied stresses. Results

  14. Comparison Evaluation of the PFP FSAR and NRC Regulatory Guide 3.39 with DOE-STD-3009-94

    SciTech Connect (OSTI)

    OSCARSON, E.E.

    2000-07-28

    One of the Plutonium Finishing Plant's (PFP) current Authorization Basis (AB) documents is the Final Safety Analysis Report (FSAR). This FSAR (HNF-SD-CP-SAR-02 1) was prepared to the format and content guidance specified in U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide 3.39, Standard Format and Content of License Applications for Plutonium Processing and Fuel Fabrication Plants (RG 3.39). In April 1992, the US Department of Energy (DOE) issued DOE Order 5480.23 which established the FSAR requirements for DOE nonreactor nuclear facilities. In 1994, DOE issued DOE-STD-3009-94, Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Safety Analysis Reports, which is a format and content guide addressing the preparation of FSARs in accordance with DOE Order 5480.23. During the initial preparation and issuance of the PFP FSAR the format and content guidance contained in NRC Regulatory Guide 3.39 was utilized, since it was the most applicable guidance at the time for the preparation of Safety Analysis Reports for plutonium processing plants. With the adoption of DOE Order 5480.23 and DOE-STD-3009-94, DOE required the preparation of SARs to meet the format and content of those DOE documents. The PFP was granted an exemption to continue with RG 3.39 format for future FSAR revisions. PFP modifications and additions have required PFP FSAR modifications that have typically been prepared to the same NRC Regulatory Guide 3.39 format and content, to provide consistency with the PFP FSAR. This document provides a table comparison between the 3009 and RG 3.39 formats to validate the extent of PFP FSAR compliance with the intent of DOE Order 5480.23 and DOE-STD-3009-94. This evaluation was initially performed on Revisions 1 and 1A of the PFP FSAR. With the preparation of a Revision 2 draft to the FSAR, sections with significant changes were reevaluated for compliance and the tables were updated, as appropriate. The tables resulting from this

  15. Nuclear Crisis Communications: The Plan Worked. A Critique of NRC Communications in the Fukushima Daiichi Reactor Crisis - 12073

    SciTech Connect (OSTI)

    Brenner, Eliot; Harrington, Holly; Schmidt, Rebecca

    2012-07-01

    'Call the AV-Photo folks and get someone in here to shoot b-roll. We'll never be able to accommodate the network cameras and the only way I can get this to the media is to produce it ourselves'. Eliot Brenner, Director NRC Office of Public Affairs, March 12, 2011. For the past four years we have been speaking to audiences at Waste Management about communications issues. Last year, though we were kept from attending because of the federal budget crisis, our surrogates described to you the lessons the nuclear industry should draw from the BP Gulf oil spill crisis. Those remarks were delivered 11 days before the Fukushima Daiichi tragedy became the nuclear landmark of a generation - an industry changing event with worldwide ramifications, both in science and regulation and in communications. Eliot Brenner cut his teeth on crisis communication in the aviation industry where tragedy unfolds rapidly. He has been a speech-writer to three cabinet secretaries, spokesman for the Federal Aviation Administration and now spokesman for the Nuclear Regulatory Commission since 2004. Holly Harrington manages the NRC crisis response program and has 26 years federal public affairs experience, including eight years at the Federal Emergency Management Agency. Her crisis experience includes the 1989 Loma Prieta earthquake, numerous hurricanes and floods, Sept 11, and, now Fukushima Daiichi. Rebecca Schmidt is a veteran government relations professional whose decades in Washington include service with the House Armed Services Committee, the House Budget Committee and the Secretary of Defense. Collectively, the Offices of Public Affairs and Congressional Affairs conducted the largest outreach for the agency since Three Mile Island. We worked with the basic rule, described to Waste Management last year just 11 days before Fukushima - communicate early, often and clearly. The response - while not without its problems and lessons - went as smoothly as a chaotic event like Fukushima could go

  16. Model Commissioning Plan and Guide Specifications

    SciTech Connect (OSTI)

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  17. DOE Replies Support NRC Commissioners and Authority to Withdraw Yucca Application

    Broader source: Energy.gov [DOE]

    In a reply brief filed with the NRC today, DOE explained that the arguments that it lacked authority to withdraw the pending Yucca Mountain license application are uniformly without merit. DOE's...

  18. Microsoft PowerPoint - 7_GARY_LANGLIE_NMMSS 2014 NRC HEU Report...

    National Nuclear Security Administration (NNSA)

    used as fuel or targets in a research or test reactor (RTR) * HEU is defined as uranium ... used as fuel or targets in a research or test reactor (RTR), the NRC reported on: - ...

  19. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE...

    National Nuclear Security Administration (NNSA)

    ... Len Myers Special Requests (301) 903-2180 Len.Myers@nnsa.doe.gov Patricia Smith NRC Reconciliation (301) 903-6860 PatriciaR.Smith@nnsa.doe.gov Reasons to Call NMMSS - How to ...

  20. Spent Nuclear Fuel Project path forward: nuclear safety equivalency to comparable NRC-licensed facilities

    SciTech Connect (OSTI)

    Garvin, L.J.

    1995-11-01

    This document includes the Technical requirements which meet the nuclear safety objectives of the NRC regulations for fuel treatment and storage facilities. These include requirements regarding radiation exposure limits, safety analysis, design and construction. This document also includes administrative requirements which meet the objectives of the major elements of the NRC licensing process. These include formally documented design and safety analysis, independent technical review, and oppportunity for public involvement.

  1. Orlando Utilities Commission- Solar Programs

    Broader source: Energy.gov [DOE]

    The Orlando Utilities Commission (OUC) also offers incentive for solar hot water heating systems. Commercial solar hot water heating systems receive a $0.03 per kWh equivalent. Residential...

  2. Commission Meeting- November 4, 2014

    Broader source: Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories AgendaArgonne National LaboratoryTCS Conference Center9700 S. Cass AveArgonne, IL 60436November 4, 2014

  3. u. S. Atomic Energy Commission

    Office of Legacy Management (LM)

    S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J. Smith Jr. Director Special Materials Division ...

  4. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    SciTech Connect (OSTI)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  5. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect (OSTI)

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  6. License renewal demonstration program: NRC observations and lessons learned

    SciTech Connect (OSTI)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff`s observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, {open_quotes}Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,{close_quotes} to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), {open_quotes}Requirements for Renewal of Operating Licenses for Nuclear Power Plants.{close_quotes} In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule.

  7. NRC Monitoring of Salt Waste Disposal at the Savannah River Site - 13147

    SciTech Connect (OSTI)

    Pinkston, Karen E.; Ridge, A. Christianne; Alexander, George W.; Barr, Cynthia S.; Devaser, Nishka J.; Felsher, Harry D.

    2013-07-01

    As part of monitoring required under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA), the NRC staff reviewed an updated DOE performance assessment (PA) for salt waste disposal at the Saltstone Disposal Facility (SDF). The NRC staff concluded that it has reasonable assurance that waste disposal at the SDF meets the 10 CFR 61 performance objectives for protection of individuals against intrusion (chap.61.42), protection of individuals during operations (chap.61.43), and site stability (chap.61.44). However, based on its evaluation of DOE's results and independent sensitivity analyses conducted with DOE's models, the NRC staff concluded that it did not have reasonable assurance that DOE's disposal activities at the SDF meet the performance objective for protection of the general population from releases of radioactivity (chap.61.41) evaluated at a dose limit of 0.25 mSv/yr (25 mrem/yr) total effective dose equivalent (TEDE). NRC staff also concluded that the potential dose to a member of the public is expected to be limited (i.e., is expected to be similar to or less than the public dose limit in chap.20.1301 of 1 mSv/yr [100 mrem/yr] TEDE) and is expected to occur many years after site closure. The NRC staff used risk insights gained from review of the SDF PA, its experience monitoring DOE disposal actions at the SDF over the last 5 years, as well as independent analysis and modeling to identify factors that are important to assessing whether DOE's disposal actions meet the performance objectives. Many of these factors are similar to factors identified in the NRC staff's 2005 review of salt waste disposal at the SDF. Key areas of interest continue to be waste form and disposal unit degradation, the effectiveness of infiltration and erosion controls, and estimation of the radiological inventory. Based on these factors, NRC is revising its plan for monitoring salt waste disposal at the SDF in coordination with South

  8. US Nuclear Regulatory Commission functional organization charts. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The report consists entirely of organizational charts of the US NRC, with functional notes for each office. (GHT)

  9. Microsoft PowerPoint - 4_JOHN_BALLARD_MARY_MCCDONNELL_NRC DOE REporting requirements_presentations_4-29-14.ppt [Compatibility M

    National Nuclear Security Administration (NNSA)

    Overview of DOE and NRC Reporting to NMMSS Similarities, Differences, and Challenges John Ballard, DOE Reconciliation Mary McConnell, NRC Reconciliation LINK Technologies Reporting to NMMSS Regulatory Compliance DOE Reporting Requirements NRC Reporting Requirements Resources 2 Regulatory Compliance DOE regulatory questions? - Contact Pete Dessaules DOE NMMSS Program Manager 301-903-4525 pete.dessaules@nnsa.doe.gov NRC regulatory questions? - Contact Brian Horn NRC NMMSS Program Manager

  10. Requiring an Office of Investigations within the Nuclear Regulatory Commission. Introduced in the House of Representatives, One Hundredth Congress, Second Session, September 29, 1988

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This bill amends the Energy Reorganization Act of 1974 to add a new section 205A that establishes within the Nuclear Regulatory Commission (NRC) a statutory Office of Investigation (OI) and establishes a director of this office who reports directly to the five NRC Commissioners. The new section also sets out the responsibility of the office for initiating and conducting investigations into violations of laws the NRC implements that relate to violations involving wrongdoing. The OI is charged with reporting violations of federal criminal law to the Department of Justice. The Committee on Energy and Commerce considered the bill, report favorably on it without amendment, and recommend its passage by the whole House of Representatives.

  11. October 6, 2014 Lab Commission Meeting Minutes

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its third meeting at 9:00 AM on October 6, 2014. The Commission members heard a DOE...

  12. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  13. NRC safety research in support of regulation - FY 1994. Volume 9

    SciTech Connect (OSTI)

    1995-06-01

    This report, the tenth in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during FY 1994. The goal of the Office of Nuclear Regulatory Research (RES) is to ensure the availability of sound technical bases for timely rulemaking and related decisions in support of NRC regulatory/licensing/inspection activities. RES also has responsibilities related to the resolution of generic safety issues and to the review of licensee submittals regarding individual plant examinations. It is the responsibility of RES to conduct the NRC`s rulemaking process, including the issuance of regulatory guides and rules that govern NRC licensed activities.

  14. Oregon Water Resources Commission | Open Energy Information

    Open Energy Info (EERE)

    Water Resources Commission Jump to: navigation, search Name: Oregon Water Resources Commission Abbreviation: OWRC Address: 725 Summer Street NE, Suite A Place: Salem, Oregon Zip:...

  15. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  16. State Historical Resources Commission | Open Energy Information

    Open Energy Info (EERE)

    Resources Commission Jump to: navigation, search Name: State Historical Resources Commission Address: 1725 23rd Street, Suite 100 Place: Sacramento, CA Zip: 95816 ParentHolding...

  17. State Land Commission FAQ | Open Energy Information

    Open Energy Info (EERE)

    Land Commission FAQ Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: State Land Commission FAQ Abstract Frequently Asked Questions, California State...

  18. California Energy Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: California Energy Commission Address: 1516 Ninth Street, MS-29 Place: Sacramento, CA Zip: 95814-5512 Website: www.energy.ca.gov...

  19. Energy Department Highlights Commissioning of Innovative Fuel...

    Office of Environmental Management (EM)

    Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground Energy Department Highlights Commissioning of Innovative Fuel Cell System at U.S. ...

  20. Regulatory Commission of Alaska | Open Energy Information

    Open Energy Info (EERE)

    includes general information about the RCA and its Commissioners. Commission The Alaska Public Service Commission (APSC) existed from 1960 until 1970. In 1970, the Alaska...

  1. Brazil Interministerial Commission on Global Climate Change ...

    Open Energy Info (EERE)

    Interministerial Commission on Global Climate Change Jump to: navigation, search Name: Brazil Interministerial Commission on Global Climate Change Place: Distrito Federal...

  2. Sandia Energy - Molten Salt Test Loop Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Energy News EC News & Events Concentrating Solar Power Solar Molten Salt Test Loop Commissioning Previous Next Molten Salt Test Loop Commissioning The Molten Salt...

  3. Arizona Corporation Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Arizona Corporation Commission Abbreviation: ACC Service Territory: Arizona Website: www.azcc.gov EIA Form 861 Data This article is a...

  4. Idaho Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Idaho Public Utilities Commission Address: P.O. Box 83720 Place: Boise, ID Zip: 83720 Website: www.puc.idaho.gov Coordinates:...

  5. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory ... and hosted jointly by the Department of Energy (DOE), National Nuclear Security ...

  6. Commission.

    National Nuclear Security Administration (NNSA)

    role in aiding risk- informed decision making in areas related to regulatory functions, international programs, materials management, program management, and financial management. ...

  7. Commissioning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Data for the graph courtesy Karl Stum; Summit Engineering Verification and Prestart Checks Functional Testing Opposite Season Testing Trend Analysis Responsibility Shifting from ...

  8. Guide to NRC reporting and recordkeeping requirements. Compiled from requirements in Title 10 of the U.S. Code of Federal Regulations as codified on December 31, 1993; Revision 1

    SciTech Connect (OSTI)

    Collins, M.; Shelton, B.

    1994-07-01

    This compilation includes in the first two sections the reporting and recordkeeping requirements applicable to US Nuclear Regulatory Commission (NRC) licensees and applicants and to members of the public. It includes those requirements codified in Title 10 of the code of Federal Regulations, Chapter 1, on December 31, 1993. It also includes, in a separate section, any of those requirements that were superseded or discontinued between January 1992 and December 1993. Finally, the appendix lists mailing and delivery addresses for NRC Headquarters and Regional Offices mentioned in the compilation. The Office of Information Resources Management staff compiled this listing of reporting and recordkeeping requirements to briefly describe each in a single document primarily to help licensees readily identify the requirements. The compilation is not a substitute for the regulations, and is not intended to impose any new requirements or technical positions. It is part of NRC`s continuing efforts to comply with the Paperwork Reduction Act of 1980 and the Office of Management and Budget regulations that mandate effective and efficient Federal information resources management programs.

  9. NRC TLD Direct Radiation Monitoring Network. Progress report, October--December 1996

    SciTech Connect (OSTI)

    Struckmeyer, R.

    1997-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1996. It provides the ambient radiation levels measured in the vicinity of 74 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program. 3 figs., 4 tabs.

  10. NRC TLD Direct Radiation Monitoring Network progress report, October--December 1994. Volume 14, No. 4

    SciTech Connect (OSTI)

    Struckmeyer, R.

    1995-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1994. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

  11. Multidisciplinary framework for human reliability analysis with an application to errors of commission and dependencies

    SciTech Connect (OSTI)

    Barriere, M.T.; Luckas, W.J.; Wreathall, J.; Cooper, S.E.; Bley, D.C.; Ramey-Smith, A.

    1995-08-01

    Since the early 1970s, human reliability analysis (HRA) has been considered to be an integral part of probabilistic risk assessments (PRAs). Nuclear power plant (NPP) events, from Three Mile Island through the mid-1980s, showed the importance of human performance to NPP risk. Recent events demonstrate that human performance continues to be a dominant source of risk. In light of these observations, the current limitations of existing HRA approaches become apparent when the role of humans is examined explicitly in the context of real NPP events. The development of new or improved HRA methodologies to more realistically represent human performance is recognized by the Nuclear Regulatory Commission (NRC) as a necessary means to increase the utility of PRAS. To accomplish this objective, an Improved HRA Project, sponsored by the NRC`s Office of Nuclear Regulatory Research (RES), was initiated in late February, 1992, at Brookhaven National Laboratory (BNL) to develop an improved method for HRA that more realistically assesses the human contribution to plant risk and can be fully integrated with PRA. This report describes the research efforts including the development of a multidisciplinary HRA framework, the characterization and representation of errors of commission, and an approach for addressing human dependencies. The implications of the research and necessary requirements for further development also are discussed.

  12. Web-Based Training on Reviewing Dose Modeling Aspects of NRC Decommissioning and License Termination Plans

    SciTech Connect (OSTI)

    LePoire, D.; Cheng, J.J.; Kamboj, S.; Arnish, J.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2008-01-15

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course was developed in 2006 and 2007 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The objective of this course is to train NRC headquarters and regional office staff on how to review sections of a licensee's DP or LTP that pertain to dose modeling. The DP generally refers to the decommissioning of non-reactor facilities, while the LTP refers specifically to the decommissioning of reactors. This review is part of the NRC's licensing process, in which the NRC determines if a licensee has provided a suitable technical basis to support derived concentration guideline levels (DCGLs)1 or dose modeling analyses performed to demonstrate compliance with dose-based license termination rule criteria. This type of training is one component of an organizational management system. These systems 'use a range of practices to identify, create, represent, and distribute knowledge for reuse, awareness and learning'. This is especially important in an organization undergoing rapid change or staff turnover to retain organizational information and processes. NRC is committed to maintaining a dynamic program of training, development, and knowledge transfer to ensure that the NRC acquires and maintains the competencies needed to accomplish its mission. This paper discusses one specific project

  13. Superfund Policy Statements and Guidance Regarding Disposition of Radioactive Waste in Non-NRC Licensed Disposal Facilities - 13407

    SciTech Connect (OSTI)

    Walker, Stuart

    2013-07-01

    This talk will discuss EPA congressional testimony and follow-up letters, as well as letters to other stakeholders on EPA's perspectives on the disposition of radioactive waste outside of the NRC licensed disposal facility system. This will also look at Superfund's historical practices, and emerging trends in the NRC and agreement states on waste disposition. (author)

  14. Commissioning in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Federal Buildings Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning is a quality-assurance process used to verify that a building performs according to the original design and intent, and meets the needs of the owners and occupants. The commissioning process also prepares building staff to operate and maintain the building. Federal agencies are required to make sure building systems and equipment are commissioned in new construction and existing buildings.

  15. H. R. 1711: a Bill to authorize appropriations for the Nuclear Regulatory Commission for fiscal year 1986 and fiscal year 1987. Introduced in the House of Representatives, Ninety-Ninth Congress, First Session

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Nuclear Regulatory Commission (NRC) appropriations for fiscal years 1986 and 1987 are $429 million and $460 million, respectively. The Bill allocates sums for each year for reactor regulation, inspection and enforcement, nuclear material safety and safeguards, reactor research, program technical support, and program administration. The Bill cites conditions for spending the funds and for entering into grants and cooperative agreements. The NRC is authorized to issue reactor operating licenses in the absence of a state or local emergency preparedness plan if it determines that public safety is assured.

  16. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  17. Opening Remarks, California Energy Commission Overview

    Broader source: Energy.gov (indexed) [DOE]

    Fuels and Transportation Division California Energy Commission May 14, 2014 1 C A L ... A E N E R G Y C O M M I S S I O N * The California Energy Commission is the state's ...

  18. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  19. Oregon Environmental Quality Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Oregon Environmental Quality Commission Address: 811 SW 6th Avenue Place: Portland, Oregon Zip: 97204-1390 Phone Number: 503-229-5301...

  20. Social Media and the NRC: What We're Doing, Why We're Doing It, and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What Else We Might Do | Department of Energy Social Media and the NRC: What We're Doing, Why We're Doing It, and What Else We Might Do Social Media and the NRC: What We're Doing, Why We're Doing It, and What Else We Might Do Social Media and the NRC: What We're Doing, Why We're Doing It, and What Else We Might Do (123.05 KB) More Documents & Publications Social Media for Natural Disaster Response and Recovery Marketing & Driving Demand: Social Media Tools & Strategies - January

  1. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  2. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  3. LINE Commission Visits Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how

  4. May 22, 2015 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its ninth meeting at 9:00 AM on May 22, 2015. Commission Co-Chair Jared Cohon led the meeting. The meeting included discussion with lab directors; technology transfer coordinators; Bay area industrial partners; and site office management. The discussion was followed by an opportunity for public comment.

  5. Beyond Commissioning: The Role of Automation

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  6. The 1997 NRC IST workshops and the status of questions and issues directed to the ASME O and M committee

    SciTech Connect (OSTI)

    DiBiasio, A.M.

    1998-05-01

    This paper describes the results of the four NRC Inservice Testing (IST) Workshops which were held in early 1997 pertaining to NRC Inspection Procedure P 73756, Inservice Testing of Pumps and Valves. It also presents the status of the ASME code committees` resolution of certain questions forwarded to the ASME by the NRC. These questions relate to code interpretations, inconsistencies in the code, and industry concerns that are most appropriately resolved through the ASME consensus process. The ASME committees reviewed the questions at their December 1997 and March 1998 code meetings. Of particular interest are those questions for which the ASME code committees did not agree with the NRC response. These questions, as well as those which the committees provided some additional insight or input, are presented in this paper.

  7. Microsoft PowerPoint - 12_BRIAN_HORN_NRC and DOE recognition May 13 2014.ppt [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    3 Recognitions Brian Horn, NRC Pete Dessaules, DOE/NNSA NRC requirements for Inventory Reporting and Reconciliation  Report Inventory to NMMSS * < 30 days - IAEA selected facilities, Cat-1 sites * < 45 days - Cat-2 sites * < 60 days - Reactors, Cat-3 sites, >350 gram licensees * Prior to March 31 st - licensees authorized < 350 grams fissile * As of Sept. 30 th - Foreign obligated source material holdings  Reconcile inventory with NMMSS within 30 days of submission 2

  8. Microsoft PowerPoint - 2_Peter J. Habighorst_NRC Remarks 2013 NMMSS Users Meeting.pptx

    National Nuclear Security Administration (NNSA)

    STATE OF NMMSS Brian Horn, NRC Peter Dessaules, DOE/NNSA Overview  NMMSS has had a highly successful year in which it reduced reconciliation and closing times, improved report products, and delivered commitments to DOE/NNSA, NRC, and other government agencies on schedule.  This would not be possible without your efforts. 2 Mission Statement  NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material

  9. Microsoft PowerPoint - NRC Nuclear Export Controls Implementing the NSG Trigger List_Gary Langlie [Compatibility Mode]

    National Nuclear Security Administration (NNSA)

    U.S. NRC Nuclear Export Controls: Implementing the NSG Trigger List Gary R. Langlie Licensing Officer Office of International Programs May 11-14, 2015 NRC's Mission 2 License and regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. Legal Basis * Atomic Energy Act of 1954, as amended * Nuclear Non-Proliferation Act of 1978 * Treaties,

  10. Automated Demand Response and Commissioning

    SciTech Connect (OSTI)

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

    2005-04-01

    This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

  11. Arizona Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission Name: Arizona Oil and Gas Commission Address: 416 W. Congress Street, Suite 100 Place: Arizona Zip:...

  12. Hawaii State Land Use Commission | Open Energy Information

    Open Energy Info (EERE)

    Hawaii State Land Use Commission Jump to: navigation, search Name: State Land Use Commission Abbreviation: LUC Place: Honolulu, Hawaii References: State Land Use Commission -...

  13. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, ...

  14. Energy Audit and Retro-Commissioning Policies for Public and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning...

  15. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  16. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    SciTech Connect (OSTI)

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  17. Oregon Public Utility Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oregon Public Utility Commission Oregon Public Utility Commission Offer comments on the United States Department of Energy Smart Grid Request for Information (RFI). Oregon Public Utility Commission (330.3 KB) More Documents & Publications Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 Comments of the American Public

  18. Commissioning Guidance for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. Download the Commissioning Guidance. (316.39 KB) More Documents & Publications FEMP Comprehensive ESPC Workshop Presentations Investment-Grade Audit Kickoff Meeting Sample

  19. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    SciTech Connect (OSTI)

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986.

  20. Harrods commissions new CHP station

    SciTech Connect (OSTI)

    Mullins, P.

    1994-04-01

    Three new combined heat and power (CHP) sets have recently been commissioned at Harrods, the world-famous department store in the heart of London's fashionable Knightsbridge district. The sets provide all the electricity needed by the store for lighting, heating and air-conditioning and are powered by Ruston 6RK270 turbocharged, charge-air-cooled diesel engines each producing 1392 kW at 750 r/min. These high power-to-weight ratio units were chosen in view of severe engine room space limitations. Low-grade waste heat is extracted from the engine jacket water to preheat water for three new boilers supplying some 1600 kg/h of steam for process heat to the store. The engines drive Brush BJS HW 10 100/8 alternators and are fully automatic in operation through a Regulateurs Europa control system. Some 600 sensors feed data into a Satchwell Building Management System (BMS). In the event of a breakdown, the engine control system can be switched to manual. 5 figs.

  1. Colorado Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    CBONDORA1251633139779 Retrieved from "http:en.openei.orgwindex.php?titleColoradoPublicUtilitiesCommission&oldid886925" Feedback Contact needs updating Image needs...

  2. Utah Labor Commission | Open Energy Information

    Open Energy Info (EERE)

    The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic...

  3. Illinois Commerce Commission | Open Energy Information

    Open Energy Info (EERE)

    Commerce Commission Place: Springfield, Illinois Zip: 62701 Product: Regulator of public utilities and transportation in Illinois. Coordinates: 42.640925, -88.413644...

  4. Alaska Planning Commission Handbook | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska Planning Commission HandbookPermittingRegulatory GuidanceGuide...

  5. Sandia Contributes to International Electrotechnical Commission...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Commission (IEC) Committee on Wind Turbine Availability to develop three specifications for IEC-61400-26-the standard that addresses wind turbine and wind-plant availability. ...

  6. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect (OSTI)

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  7. Nevada Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Nevada Public Utilities Commission Abbreviation: NPUC Address: Southern Nevada Office, 9075 West Diablo Drive, Suite 250 Place: Las Vegas, Nevada Zip: 89148 Phone Number:...

  8. NUCLEAR REGULATORY,.COMMISSION REGION I

    Office of Legacy Management (LM)

    Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The ... In general, files which indicated thatlicf -material' -may,have,been used at-a particular ...

  9. Michigan Public Service Commission | Open Energy Information

    Open Energy Info (EERE)

    of the Michigan Public Service Commission is to grow Michigan's economy and enhance the quality of life of its communities by assuring safe and reliable energy,...

  10. Hawaii Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Hawaii Public Utility Commission Address: 465 South King Street 103 Place: Honolulu, Hawaii Zip: 96813 Coordinates: 21.3053513, -157.85857 Show Map Loading map......