Powered by Deep Web Technologies
Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Name Name Address Place Zip Category Sector Telephone number Website  

Open Energy Info (EERE)

Category Sector Telephone number Website Category Sector Telephone number Website Coordinates Testing Facilities Overseen References Alden Research Laboratory Inc Alden Research Laboratory Inc Shrewsbury Street Shrewsbury Street Holden Massachusetts Category Testing Facility Operators Hydro Hydro http www aldenlab com http www aldenlab com Alden Tow Tank Alden Wave Basin Alden Small Flume Alden Large Flume Bucknell University Bucknell University Civil Mechanical Engineering Departments Hydraulic Flume Moore Avenue Dana Engineering Building Lewisburg Pennsylvania Category Testing Facility Operators Hydro http www bucknell edu x16287 xml Bucknell Hydraulic Flume Colorado State University Hydrodynamics Colorado State University Hydrodynamics Daryl B Simons Building Engineering Research Center Campus Delivery

2

JOHN KORMENDY ADDRESS AND TELEPHONE NUMBER: Department of Astronomy  

E-Print Network [OSTI]

VITA JOHN KORMENDY ADDRESS AND TELEPHONE NUMBER: Department of Astronomy University of Texas@astro.as.utexas.edu (email) EDUCATION: B. Sc. 1970, Honours Mathematics, Physics and Chemistry (Astronomy Division), University of Toronto Ph. D. 1976, Astronomy, California Institute of Technology, Pasadena, CA POSITIONS: Apr

Kormendy, John

3

Title, Location, Document Number Estimated Cost Description  

Broader source: Energy.gov (indexed) [DOE]

Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Title, Location, Document Number Estimated Cost Description EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $65,000 Annual NEPA Planning Summary NEPA Reviews of Proposals to Implement Enterprise SRS Initiatives unknown The Savannah River Site Strategic Plan for 2011 - 2015 describes 12 initiatives that Enterprise SRS will pursue by applying SRS's management core competencies in nuclear materials. Implementation of new missions resulting from this effort will likely require NEPA review. However, until firm proposals are developed

4

Grant Title: STARR FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: STARR FOUNDATION Funding Opportunity Number: N/A Agency/Department: Starr Foundation Grants Program. Area of Research: The foundation makes grants in the following areas: education, medicine and post-secondary schools. Grants for medicine and health care include capital grants to hospitals

Farritor, Shane

5

TYPES OF COMPLIANCE REQUIREMENTS: CFDA Number Program Title  

Broader source: Energy.gov (indexed) [DOE]

Number Number Program Title Activities Allowed or Unallowed Allowable Costs/Cost Principles Cash Management Davis Bacon Act Eligibility Equipment and Real Property Management Matching, Level of Effort, Earmarking Period of Availability of Federal Funds Procurement/ Suspension/ Debarment Program Income Real Property Acquisition/ Relocation Reporting Subrecipient Monitoring NEPA National Historic Preservation Act Special Tests and Provisions 81.036 Inventions and Innovations Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.049 Office of Science Financial Assistance Program Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.079 Regional Biomass Energy Programs Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.086 Conservation Research and Development Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes 81.087 Renewable Energy Research and

6

telephone patch  

Science Journals Connector (OSTI)

1. In a telephone network, a temporary connection between circuits or communications systems. 2. A connection that (a) is between the air-ground communications link and the local or long-distance tel...

2001-01-01T23:59:59.000Z

7

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN schedule and procedures necessary to conclude the amendment review process. At the Prehearing Conference

8

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network [OSTI]

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN-700-2009-004.PDF #12;2 Notice of Committee's Intention to Use Informal Hearing Procedures Pursuant

9

The Telephone Legacy Telephones and networks  

E-Print Network [OSTI]

Brunei Iceland Israel New Zealand Singapore Canada United Kingdom Guam Japan Macau Bermuda Puerto Rico system in Japan for the Asahi Times. Commercially successful in Japan for transmitting ideograms drove the telephone industry and helped create demand for household telephones. Use of telephones

Levi, Anthony F. J.

10

Complete Policy Title: Policy Number (if applicable): Violence in the Workplace -  

E-Print Network [OSTI]

Complete Policy Title: Policy Number (if applicable): Violence in the Workplace - McMaster University Policy on Approved by: Date of Most Recent Approval: Senate June 2, 2010 Board of Governors June 17, 2010 Date of Original Approval: Supersedes/Amends Policy dated: June 2, 2010 Responsible

Haykin, Simon

11

Page 1 of 7 Student number Title (e.g. Mr, Mrs)  

E-Print Network [OSTI]

Page 1 of 7 Student number Title (e.g. Mr, Mrs) First name Surname Date of birth Gender Nationality Language Exchange Scholarship 2012-13 Application Form Section 1 ­ Personal details #12;Page 2 of 7 Please and scholarships #12;Page 3 of 7 1. Personal Statement Please provide a personal statement. This could include

Miranda, Eduardo Reck

12

Grant Title: VERIZON FOUNDATION EDUCATION GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: VERIZON FOUNDATION EDUCATION GRANTS Funding Opportunity Number: N/A Agency and Accessibility, Internet Safety). Grant applicants are required to select one or more outcomes and results for grants in each of their Funding Priorities. Detailed Information: http://foundation.verizon.com/grant

Farritor, Shane

13

Grant Title: NATIONAL EDUCATION ASSOCIATION -STUDENT ACHIEVEMENT GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: NATIONAL EDUCATION ASSOCIATION - STUDENT ACHIEVEMENT GRANTS Funding Opportunity Number awards. Length of Support: Grants will fund activities for 12 months from the date of the award. Eligible not apply for Student Achievement Grants. Preference will be given to members of the National Education

Farritor, Shane

14

Grant Title: IBM GRANTS PROGRAM Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: IBM GRANTS PROGRAM Funding Opportunity Number: N/A Agency/Department: IBM Grants.S. Internal Revenue Code. Summary: The main focus of the IBM Grants Program is on education due to the power Giving. Detailed Information: http://www.ibm.com/ibm/ibmgives/grant/grantapp.shtml #12;

Farritor, Shane

15

Grant Title: WILLIAM T. GRANT INVESTIGATOR INITIATED GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: WILLIAM T. GRANT INVESTIGATOR INITIATED GRANTS Funding Opportunity Number: N/A Agency/Department: William T. Grant Foundation. Area of Research: The Foundation supports high-quality research January, early April, and early September for investigator-initiated research grants. Amount: The amount

Farritor, Shane

16

Grant Title: LAWRENCE FOUNDATION GRANTS PROGRAM Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: LAWRENCE FOUNDATION GRANTS PROGRAM Funding Opportunity Number: N/A Agency/Department: The Lawrence Foundation. Area of Reseach: Grants to support environmental, education, human services and other and libraries are eligible for contributions or grants. Summary: The foundation is focused on making grants

Farritor, Shane

17

Grant Title: CURE AUTISM NOW FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: CURE AUTISM NOW FOUNDATION Funding Opportunity Number: N/A Agency/Department: Autism: Deadline varies for each grant. All proposals must be submitted online via the Autism Speaks grants-level research grant: $150,000/year maximum. For a pilot-level research grant: $60,000/year maximum. Length

Farritor, Shane

18

Grant Title: GENERAL MILLS -CHAMPIONS FOR HEALTHY KIDS GRANT Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: GENERAL MILLS - CHAMPIONS FOR HEALTHY KIDS GRANT Funding Opportunity Number: N, developed the Champions for Healthy Kids grant program in 2002. Each year since inception, the General Mills Foundation awards 50 grants of $10,000 each to community-based groups that develop creative ways to help

Farritor, Shane

19

Grant Title: FACULTY SEED GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: FACULTY SEED GRANTS Funding Opportunity Number: N/A Agency/Department: UNL, Office support. Faculty Seed Grants are available to scholars from all disciplines and can be used for whatever will be given to non-tenured junior faculty and to those who have not received a Grant-In-Aid or Faculty Seed

Farritor, Shane

20

Grant Title: MELINDA GRAY ARDIA ENVIRONMENTAL FOUNDATION GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: MELINDA GRAY ARDIA ENVIRONMENTAL FOUNDATION GRANTS Funding Opportunity Number: N the emphasis and application of basic ecological principles. The Foundation has a grant program called Environmental Curriculum Development Grants. These grants are the Foundation's main program in which one to two

Farritor, Shane

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Grant Title: PUBLIC WELFARE FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: PUBLIC WELFARE FOUNDATION Funding Opportunity Number: N/A Agency, and November 18 annually. Amount: Grants range from $1,000-500,000. Length of Support: Most grants cover-year grants. Eligible Applicants: The Public Welfare Foundation does not accept requests to fund scholarships

Farritor, Shane

22

Grant Title: MARCH OF DIMES RESEARCH GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: MARCH OF DIMES RESEARCH GRANTS Funding Opportunity Number: N/A Agency Research Awards are due annually on March 10. Amount: For a general March of Dimes Research Grant, the average grant is approximately $100,000 per year. Basil O'Connor Starter Scholar Research Awards are $150

Farritor, Shane

23

Grant Title: LINCOLN COMMUNITY FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: LINCOLN COMMUNITY FOUNDATION Funding Opportunity Number: N/A Agency Quick Response Grant amount is $1000. Length of Support: From 1 to multiple years, based on scope: Competitive grants often include, but are not limited to, the arts and culture, children and youth, basic

Farritor, Shane

24

Grant Title: DOW COMPANY -Education Grants Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: DOW COMPANY - Education Grants Funding Opportunity Number: N/A Agency boards. Summary: The Education Grants category includes yearly grants for Education. Dow is proud through the companyGIVES Education Grants Program. The program is a competitive grant process that allows

Farritor, Shane

25

Grant Title: DOLLAR GENERAL LITERACY GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: DOLLAR GENERAL LITERACY GRANTS Funding Opportunity Number: N/A Agency/Department: Dollar General. Area of Research: Literacy grants. Release and Expiration: N/A Application Deadline: Family Literacy: Annually in March. Adult Literacy Grants: Annually in March. Youth Literacy Grants

Farritor, Shane

26

Grant Title: GARTH BROOKS TEAMMATES FOR KIDS FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: GARTH BROOKS TEAMMATES FOR KIDS FOUNDATION Funding Opportunity Number: N/A Agency prioritizes: grants that emphasize prevention and/or recovery from health problems; grants that enhance the health of needy children by promoting healthy lifestyles; and grants that provide access to medicine

Farritor, Shane

27

Grant Title: PACIFIC LIFE FOUNDATION GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: PACIFIC LIFE FOUNDATION GRANTS Funding Opportunity Number: N/A Agency is made in early November, with payment intended to be made before the end of January. Award of a grant does not mean that future support will automatically be available. Amount: General grants range from $5

Farritor, Shane

28

Grant Title: AMERICAN FOUNDATION FOR SUICIDE PREVENTION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: AMERICAN FOUNDATION FOR SUICIDE PREVENTION Funding Opportunity Number: N/A Agency: Distinguished Investigator Grants for up to $100,000 over the grant period. Standard Research Grants: Up to $75,000 over the grant period. Linked Standard Research Grants: Up to $225,000 over the grant period. Young

Farritor, Shane

29

Grant Title: GRAMMY FOUNDATION GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: GRAMMY FOUNDATION GRANTS Funding Opportunity Number: N/A Agency/Department: The GRAMMY Applicants: The GRAMMY Foundation Grant Program awards grants to organizations and individuals to support to the impact of music on the human condition. Summary: The GRAMMY Foundation Grant Program awards grants

Farritor, Shane

30

Grant Title: ALFRED P. SLOAN FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: ALFRED P. SLOAN FOUNDATION Funding Opportunity Number: N/A Agency/Department: Alfred P of inquiry will be contacted and invited to submit a formal grant proposal. Amount: For grant requests of $50,000 or less, no overhead costs are permitted. For grant requests larger than $50,000, overhead costs may total

Farritor, Shane

31

Grant Title: FORD FOUNDATION GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: FORD FOUNDATION GRANTS Funding Opportunity Number: N/A Agency/Department: The Ford for a grant by visiting the Grants section of the Foundation's website and submitting an online grant inquiry: Not listed. Eligible Applicants: Activities supported by grants and program-related investments must

Farritor, Shane

32

Grant Title: THE AMERICAN PHILOSOPHICAL SOCIETY FELLOWSHIP AND GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: THE AMERICAN PHILOSOPHICAL SOCIETY FELLOWSHIP AND GRANTS Funding Opportunity Number: N/A Agency/Department: The American Philosophical Society. Area of Research: Fellowships and grants: September 1; Franklin Research Grants: October 1 and December 1; Lewis and Clark Fund for Exploration

Farritor, Shane

33

1. Department, Course Number, Title ORE 664, Nearshore Processes and Sediment Transport  

E-Print Network [OSTI]

1. Department, Course Number, Title ORE 664, Nearshore Processes and Sediment Transport 2 Sediment transport by waves and currents in coastal areas and its effect on morphological processes. Effect Reference books: 1. Beach Processes and Sedimentation, P.D. Komar, 2nd Edition, Prentice-Hall, Inc., 1998 2

Frandsen, Jannette B.

34

Course Number: 7/8129 Course Title: Environmental Sampling and Analysis  

E-Print Network [OSTI]

for measuring environmental chemical and biological contaminants. We will primarily examine sampling1 Course Number: 7/8129 Course Title: Environmental Sampling and Analysis The University of Memphis and analytical methods used to measure airborne contaminants in the general environments as well as the workplace

Dasgupta, Dipankar

35

CIS 380 Operating Systems Course Number & Title (A.1) CIS 380 Operating Systems  

E-Print Network [OSTI]

CIS 380 Operating Systems Course Number & Title (A.1) CIS 380 Operating Systems Credit Units (A.2 Operating Systems (3/e). Prentice Hall, Supplementary text: W. Richard Stevens and Stephen A. Rago. Advanced) This course is an introduction to the theory and practice behind modern computer operating systems. Topics

Plotkin, Joshua B.

36

Table C5-3 Biomedical Instrumentation Track Curriculum (Department, Number, Title)  

E-Print Network [OSTI]

51 Table C5-3 Biomedical Instrumentation Track Curriculum Course (Department, Number, Title) List Introduction to Biomedical Engineering R 0 F11 & F12 80/84 1st Year - Spring Semester (19 Credits) HUM 102 Programming R 3 F12 & S13 30 BME 301* Electrical Fundamentals of Biomedical Engineering R 3 F12 & S13 25 BME

37

Telephone Service | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Telephone Service Telephone Service Set Up a Teleconference Call A teleconference allows people to converse by sharing a common phone number and password and dialing in at a predetermined time. To set up a teleconference, submit an online request to the phone operators at least 1 hour before the conference start time. Requests are processed and confirmations are sent during normal business hours. You will also need to supply an Argonne cost code. Submit a Teleconference Request (log in with your Argonne username and password) Documentation Forward Your Telephone Calls Depending on what model of phone you have, you can send your incoming Argonne calls to another telephone. On an EADS Telecom STE model To turn call fowarding on, press *3 and enter the destination telepone number.

38

Title list of documents made publicly available: May 1--31, 1997. Volume 19, Number 5  

SciTech Connect (OSTI)

The Title List of Documents Made Publicly Available is a monthly publication. It describes the information received and published by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) non-docketed material received and published by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index.

NONE

1997-07-01T23:59:59.000Z

39

Title list of documents made publicly available, March 1--31, 1998. Volume 20, Number 3  

SciTech Connect (OSTI)

The Title List of Documents Made Publicly Available is a monthly publication. It describes the information received and published by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and published by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a personal author index, a corporate source index, and a report number index.

NONE

1998-05-01T23:59:59.000Z

40

Grant Title: KNOWLEDGE DISSEMINATION CONFERENCE GRANTS PROGRAM ANNOUNCEMENT Funding Opportunity Number: CFDA Number(s) -93.243; Funding Opportunity Number -OA-08-002.  

E-Print Network [OSTI]

Grant Title: KNOWLEDGE DISSEMINATION CONFERENCE GRANTS PROGRAM ANNOUNCEMENT Funding Opportunity may apply. Individuals are not eligible to receive grant support for a conference. Summary Dissemination Conference Grants program (also referred to as SAMHSA Conference Grants). The purpose

Farritor, Shane

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The Pacific Telephone Cable  

Science Journals Connector (OSTI)

... ceremonies in Ottawa, Sydney, Wellington and Suva. The transmission was over the first telephone cable to be laid across the Pacific Ocean.

1964-02-08T23:59:59.000Z

42

Elec Eng 2FH3 Electromagnetics I COURSE NUMBER & TITLE: Elec Eng 2FH3 Electromagnetics I  

E-Print Network [OSTI]

Elec Eng 2FH3 ­ Electromagnetics I COURSE NUMBER & TITLE: Elec Eng 2FH3 ­ Electromagnetics I field 6. Inductance 7. Faraday's law CALENDAR DESCRIPTION: Electromagnetics Part I is an introduction into engineering electromagnetics. It covers the mathematical foundations such as selected topics of vector

Haykin, Simon

43

Grant Title: NATIONAL EDUCATION ASSOCIATION -LEARNING AND LEADERSHIP GRANTS Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: NATIONAL EDUCATION ASSOCIATION - LEARNING AND LEADERSHIP GRANTS Funding Opportunity in collegial study. Multiple awards. Length of Support: Grants will fund activities for twelve months from education institutions. Administrators may not apply for Learning & Leadership grants. Preference

Farritor, Shane

44

Grant Title: RESEARCH EXPERIENCES FOR TEACHERS (RET) IN ENGINEERING AND COMPUTER Funding Opportunity Number: NSF 11-509. CFDA Number(s): 47.041.  

E-Print Network [OSTI]

Grant Title: RESEARCH EXPERIENCES FOR TEACHERS (RET) IN ENGINEERING AND COMPUTER SCIENCE Funding, Directorate for Engineering Engineering Education and Centers, Directorate for Computer & Information Science applicants. Summary: The Directorate for Engineering (ENG) and the Directorate for Computer and Information

Farritor, Shane

45

Awards Received in October 2006 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

OSP Number ABRUNA, HECTOR D DISALVO, FRANCIS J CCMR DOE AN ADVANCED MATERIALS APPROACH TO FUEL CELL RESEARCH PROJECT $33,025 THF 52476 BELL, JAMES F CRSR NASA (GODDARD SFC) COMPOSITION AND WEATHERING HISTORY

Danforth, Bryan Nicholas

46

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

talks: 18 Presentation number Start time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim...

47

Title list of documents made publicly available: November 1--30, 1997. Volume 19, Number 11  

SciTech Connect (OSTI)

This document is a monthly publication containing descriptions of information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. The following indexes are included: Personal Author, Corporate source, Report Number, and Cross Reference of Enclosures to Principal Documents.

NONE

1998-01-01T23:59:59.000Z

48

Title list of documents made publicly available: December 1--31, 1996. Volume 18, Number 12  

SciTech Connect (OSTI)

This document is a monthly publication containing descriptions of information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials, and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. The following indexes are included: Personal Author, Corporate Source, Report Number, and Cross Reference of Enclosures to Principal Documents.

NONE

1997-03-01T23:59:59.000Z

49

Grant Title: SBE DOCTORAL DISSERTATION RESEARCH IMPROVEMENT GRANTS Funding Opportunity Number: NSF 11-547. CFDA Number(s): 47.075.  

E-Print Network [OSTI]

11-547. CFDA Number(s): 47.075. Agency/Department: National Science Foundation; Directorate for Social, Behavioral & Economic Sciences; Division of Behavioral and Cognitive Sciences; Division of Social and Economic Sciences; Division of Science Resources Statistics; SBE Office of Multidisciplinary Activities

Farritor, Shane

50

Title list of documents made publicly available: April 1--30, 1996. Volume 18, Number 4  

SciTech Connect (OSTI)

This publication describes the information received and published by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) non-docketed material received and published by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index.

NONE

1996-06-01T23:59:59.000Z

51

Title list of documents made publicly available: February 1--28, 1995. Volume 17, Number 2  

SciTech Connect (OSTI)

This monthly publication contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here, docketed refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. NRC documents that are publicly available may be examined without charge at the NRC Public Document Room (PDR).

NONE

1995-04-01T23:59:59.000Z

52

Validation study of a French version of the modified Telephone Interview for Cognitive Status (F-TICS-m) in elderly women  

E-Print Network [OSTI]

1 Validation study of a French version of the modified Telephone Interview for Cognitive Status (F-TICS-m) in elderly women Running Title: Validation of TICS-m in French Keywords: TICS-m; telephone screening of 120 community-dwelling French women, the Telephone Interview for Cognitive Status (F-TICS-m) showed

Paris-Sud XI, Université de

53

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

51 Rev. l 51 Rev. l Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX 81.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & 8 to Subpart D, & CX 81.28. WRPS' facilities include all those identified in

54

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

93 Rev 0 93 Rev 0 River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX B5.6, "Oil Spill Cleanup" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to remove and cleanup oil and related contaminated materials recovered during oil spill cleanup operations during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & ex B5.6. WRPS' facilities include all those identified in the Tank Operations Contract

55

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

38, Rev 1 38, Rev 1 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices, communication systems, data processing equipment, and similar electronic equipment. Activities include, but are not limited to, install fiber optic cable between and within existing buildings; install new conduit and/or replace old conduit; minor

56

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

57

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

48 Rev. 1 48 Rev. 1 Washington River Protection Solutions LLC -Proposed Actions For CY 2013 Scheduled To Take Place Under CX B1.3, "Routine Maintenance" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform routine maintenance services on buildings, structures, infrastructure and equipment during Calendar Year 2013. WRPS will perform all routine maintenance activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, and CX B1.3. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13

58

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

3, Rev 0 3, Rev 0 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental monitoring (including siting, construction, modification, operation, dismantlement, and removal of equipment). Activities would be near-surface, shallow, and in previously disturbed or developed areas; designed to conform with applicable requirements and use best management practices to limit the effects of any resultant ground disturbance.

59

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

7 Rev 0 7 Rev 0 Washington River Protection Solutions LLC Place Under CX 86.1, "Cleanup Actions" Proposed Actions For CY 2013 Scheduled To Take 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform small-scale, short-term cleanup actions, costing ten million or less, under the Resource Conservation & Recovery Act (RCRA), Atomic Energy Act, or other authorities as necessary to reduce risk to human health or the environment from a release or threat of release of a hazardous substance of than high-level radioactive waste and spent nuclear fuel during Calendar Year 2013. WRPS

60

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

62 Rev. 1 62 Rev. 1 Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Onder CX B5.1, "Actions to Conserve Energy or Water" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to conserve energy or water during Calendar Year 2013. WRPS will perform all activities in accordance with the cal exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX 85.1. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.l3 and J.l4. Activities would include, but are not limited to:

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

47, Rev 1 47, Rev 1 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, where the predominant activity is transportation, and where the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site; and all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Transfers may

62

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

87 87 CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation (PRC) will be conducting site characterization and environmental monitoring on the Han Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 102 , Appendix B, CX 83.1, ''Site characterization and environmental monitoring''. PRC ects include all those identified Sections J.l3 and J.l4 of the PRC Contract, DE-AC06-0 RL14788. Site characterization and environmental monitoring (including, but not limited to, siting,

63

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

5 5 Washington River Protection Solutions LLC - Renovation of 274-AW Under CX B2.l, "Workplace Enhancements" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will renovate the 274-AW building. The 274-AW building is a 10-wide modular building located in the 200 East Area near the 241-AW and 241-AP Tank Farms. It was installed in 1993 by Eric R. Brown Construction, Inc. as a support facility for 272-AW. The facility currently serves as an office for WRPS' Base Operations managers and engineers. 274-AW is centrally located and easily accessible,

64

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

11, Rev 0 11, Rev 0 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance and custodial services on Hanford buildings, structures, infrastructures, and equipment in previously disturbed and developed areas. Routine maintenance and custodial services include those in MSA contract DE-AC06-09RL14728, Attachment J.3. Buildings, structures, infrastructures, and equipment subject to routine maintenance and custodial services

65

Emergency Response and Phone EMERGENCY TELEPHONE NUMBERS  

E-Print Network [OSTI]

extinguisher. Do not use water on electrical fires. #12;154 BUILDING EVACUATION When the alarm sounds, walk and may lose electric power. Be aware of alternate exits from the building. Before leaving the work. · conscious and ambulatory STAFF, arrange for transportation by car or ambulance to the hospital or doctor

66

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coupled HCTM Phenomena Coupled HCTM Phenomena From Pore-scale Processes to Macroscale Implications DE-FE0001826 J. Carlos Santamarina Georgia Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Relevance "Faustian bargain"? long-term CO 2 geo-storage needed (C-economy + climate change)

67

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project DE-FE0001808 Novel Oxygen Carriers For Coal-Fueled Chemical Looping Combustion Western Kentucky University Presenter: Dr. Yan Cao Institute for Combustion Science and Environmental Technology February 25, 2011 Project Participants * PIs: Dr. Wei-Ping Pan Dr. Yan Cao * Students: Ms. Wen Ying (Master student) Mr. Andy Wang (Undergraduate student) Mr. Yanwen Cui (Master student) Introduction (limit - 1 slide) * Background on the project * Anticipated benefits Solid Oxygen Carriers 1. Commercially accepted kinetics - coupling and potential uncoupling (free oxygen) 2. Thermal Stability, Lower degradation, and Lower Attrition loss 3. Favored thermodynamics for pure CO 2 4. Opportunity to release of free oxygen for improvement of process kinetics;

68

Title Project Number  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Research 2011 Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson, Department of Civil and Environmental Engineering February 24-26, 2011 Project Participants * Dr. Janelle Thompson, PhD, Assistant Professor, Civil and Environmental Engineering (MIT) * Dr. Hector Hernandez, PhD, Martin Luther King Postdoctoral Fellow (MIT) * Mr. Kyle Peet, doctoral student, Civil and Environmental Engineering, MIT * 2 undergraduates Janelle Hector Kyle 3 Why do microbes matter? CO 2 "trapping" mechanisms -biofilm barriers -mineralization Natural and Engineered Systems Mitchell et al, 2009 dawsonite Biofilm Barriers Biological catalysis of mineral trapping Can we recover life forms that grow in supercritical CO

69

Link to the online course catalogue for more detailed information on the courses in Law Course Number Course Title Course Type Instructor Course begins Course ends Rhyth.  

E-Print Network [OSTI]

Wirtschaften Seminar Bienert by appointment 22773 Sustainable Real Estate Seminar Bienert by appointment 22802 Administration, Economics, Management Information Systems, Real Estate Link to the online course catalogue Systems, Real Estate Course Number Course Title Course Type Instructor Course begins Course ends Rhyth

Schubart, Christoph

70

BOMB THREAT PLACE THIS CARD UNDER YOUR TELEPHONE  

E-Print Network [OSTI]

BOMB THREAT PLACE THIS CARD UNDER YOUR TELEPHONE QUESTIONS TO ASK: 1. When is the bomb going? EXACT WORDING OF THE THREAT: Sex of caller: Race: Age: Number at which call received: Length of call: Check Caller ID - *69: Record caller's number: Time: Date: IMMEDIATELY REPORT BOMB THREATS TO

Slatton, Clint

71

Trans-Atlantic Telephone Cable  

Science Journals Connector (OSTI)

... and Telegraph Co. of Canada, for the provision of the first trans -Atlantic telephone cable, as distinct from the existing telegraph ... , as distinct from the existing telegraph cables. The installation, which is estimated to cost 12-J million, is likely to ...

1953-12-19T23:59:59.000Z

72

Grant Title: AUTISM SPEAKS -TREATMENT RESEARCH GRANTS: FULL-AND PILOT-LEVEL Funding Opportunity Number: N/A  

E-Print Network [OSTI]

Grant Title: AUTISM SPEAKS - TREATMENT RESEARCH GRANTS: FULL- AND PILOT-LEVEL Funding Opportunity: Treatment research: Full-level research grant $150,000/year maximum. Pilot-level research grant $60,000/year maximum. Basic and clinical research: Full-level research grant $150,000/year maximum. Pilot

Farritor, Shane

73

First Name: Last Name: Title: Telephone: Fax: Email: First Name...  

U.S. Energy Information Administration (EIA) Indexed Site

Power Marketer (or Energy Service Provider) State Municipal Investor-Owned Federal Political Subdivision NOTICE: This report is mandatory under the Federal Energy Administration...

74

Title Standards 2001  

Broader source: Energy.gov (indexed) [DOE]

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

75

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

76

PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

77

TITLE PAGE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

78

Proposal Title Millersville University Content Repository for Boundary  

E-Print Network [OSTI]

Professor Institution: Millersville University, Department of Earth Sciences Telephone number: (717) 871-4739 FAX number: (717) 871-4725 Street Address: 18 Creek Dr., Millersville University, Millersville, PA: Millersville University, Department of Earth Sciences Telephone number: (717) 871-4739 FAX number: (717) 871

79

--No Title--  

National Nuclear Security Administration (NNSA)

U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 Telephone: (865) 576-8401 Fax: (865) 576-5728 E-mail:...

80

New Round-the-World Telephone Cable  

Science Journals Connector (OSTI)

... THE construction of a round-the-world Commonwealth telephone cable was considered at the Commonwealth Trade and Economic Conference in Montreal. It was envisaged ... provision would be based on capital contributions from all Commonwealth countries and that the new cable could be operated on a self-supporting financial basis. The first trans-oceanic telephone ...

1958-10-04T23:59:59.000Z

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Avaya one-XTM Deskphone Value Edition 1603 IP Telephone  

E-Print Network [OSTI]

Avaya one-XTM Deskphone Value Edition 1603 IP Telephone User Guide 16-601444 Issue 1 July 2007 #12 ..................................................................................................... 5 Introduction to the 1603 IP Telephone .................................................. 7

82

The Telephone: An Invention with Many Fathers  

ScienceCinema (OSTI)

The names of A.G. Bell, A. Meucci, P.Reis, E. Gray, just to mention the most important ones, are all connected with the invention of the telephone. Today, the Italian inventor A. Meucci is recognized as being the first to propose a working prototype of the electric telephone. However, for a series of reasons his strenuous efforts were not rewarded. I will not repeat here the endless and complex disputes about the ?real father? of the telephone. From an historical point of view it is more interesting to understand why so many individuals from different backgrounds conceived of a similar apparatus and why most of these devices were simply forgotten or just remained laboratory curiosities. The case of the development of the telephone is an emblematic and useful example for better understanding the intricate factors which are involved in the birth of an invention and reasons for its success and failure.

Paolo Brenni

2010-01-08T23:59:59.000Z

83

Number  

Office of Legacy Management (LM)

' ' , /v-i 2 -i 3 -A, This dow'at consists ~f--~-_,_~~~p.~,::, Number -------of.-&--copies, 1 Series.,-a-,-. ! 1 THE UNIVERSITY OF ROCHESTER 1; r-.' L INTRAMURALCORRESPONDENCE i"ks' 3 2.. September 25, 1947 Memo.tor Dr. A. H, Dovdy . From: Dr. H. E, Stokinger Be: Trip Report - Mayvood Chemical Works A trip vas made Nednesday, August 24th vith Messrs. Robert W ilson and George Sprague to the Mayvood Chemical F!orks, Mayvood, New Jersey one of 2 plants in the U.S.A. engaged in the production of thorium compounds. The purpose of the trip vas to: l 1. Learn the type of chemical processes employed in the thorium industry (thorium nitrate). 2. Survey conditions of eeosure of personnel associated vith these chemical processes. 3. Obtain samples of atmospheric contaminants in the plant, as

84

The Cost of a Telephone Call  

Science Journals Connector (OSTI)

......small users a further factor is the rebate on the standing charge. I have considered the matter of standing charge rebates elsewhere.2 Telephone charges have...small" and no definite size for a rebate.) The cost in a situation of one......

M. RYCRAFT

1987-01-01T23:59:59.000Z

85

Detecting Fraud in Cellular Telephone Networks  

E-Print Network [OSTI]

Detecting Fraud in Cellular Telephone Networks Johan H van Heerden Thesis presented for the degree fraud. Hence it is of great importance that fraud management sys- tems are implemented to detect, alarm, and shut down fraud within minutes, minimising revenue loss. Modern proprietary fraud management systems

van Vuuren, Jan H.

86

UNIVERSITY LIBRARIES TELEPHONE NUMBERS AND LOCATIONS March 7, 2011  

E-Print Network [OSTI]

........................................................................................ 2-8684 Dylan Wiersma ...................................................................... M450

Stowell, Michael

87

Geothermal: Sponsored by OSTI -- Telephone Flat Geothermal Development...  

Office of Scientific and Technical Information (OSTI)

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments Geothermal Technologies Legacy...

88

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Time: 2014-11-18 08:00:00 6456Proposal: NS-2014-6456-A PI: Paris Wiley Institution: Honeywell Corporation Title: Neutron Single Event Effects T... Start Time: 2014-11-19 08:00:00...

89

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ImageRotator.items href: 'javascript:void(0)', alt: 'Mule deer near cocooned reactor', title: 'Mule deer near cocooned reactor', image: src: 'http:www.hanford.govc.cfm...

90

--No Title--  

National Nuclear Security Administration (NNSA)

in Table 2.0. According to Title 40 CFR 61.93.(b)(4), (CFR 2002) no credit was taken for pollution control equipment in determining air emissions. The emissions for NESHAPs...

91

The diffusion of mobile telephones: An empirical analysis for Peru  

Science Journals Connector (OSTI)

This paper models the diffusion of mobile telephone subscriptions in Peru. Peru's mobile telephone diffusion has occurred in a concentrated market with relatively high prices and as such it features consumer behaviors such as call management, multiple ... Keywords: Diffusion forecasting, Gompertz curve, Mobile telephones, Peru, Technology diffusion

Peter Yamakawa; Gareth H. Rees; Jos Manuel Salas; Nikolai Alva

2013-07-01T23:59:59.000Z

92

Implementation of Title V in California  

SciTech Connect (OSTI)

This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

Werner, B.; Cook, B.

1996-12-31T23:59:59.000Z

93

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

94

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

95

FORESTRY COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone  

Broader source: Energy.gov (indexed) [DOE]

FORESTRY FORESTRY COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov Timber tract operations 113110 Cutting and transporting timber 113310 GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone (706) 213-3823 Email annc@sepa.doe.gov Timber tract operations 113110 Cutting and transporting timber 113310 NEW MEXICO NNSA SERVICE CENTER POC Gregory Gonzales Telephone (505) 845-5420 Email ggonzales@doeal.gov Timber tract operations 113110 Cutting and transporting timber 113310 OHIO EM BUSINESS CENTER POC Karen Bahan Telephone (513) 246-0555 Email karen.bahan@emcbc.doe.gov Timber tract operations 113110 Cutting and transporting timber 113310 OKLAHOMA SOUTHWESTERN POWER ADMIN POC Gary Bridges Telephone (918) 595-6671 Email gary.bridges@swpa.gov Timber tract operations 113110

96

Project Title:__________________________________________________________________ Proposal #: _____________  

E-Print Network [OSTI]

#: _____________ Company Name: Name on Card: Mailing Address: Email: Telephone: FAX: Credit Card Type: Credit Card #, and the funding expiration date. NanoFab Payment Form Dollar Amount: Exp. Date mm/yy Credit Card Payment Purchase) contact name; 2) email; 3) fax; 4) telephone; 5) company name; 6) company mailing address; 7) Tax

97

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in science and technology research and development." ORNL's entry highlighted a number of organizational learning and development programs and best practices, including the...

98

--No Title--  

National Nuclear Security Administration (NNSA)

NUCLEAR ENERGY UNIVERSITY PROGRAMS Improved Fission Neutron Data Base for Active Interrogation of Actinides PI: Pozzi, Sara - University of Michigan Project Number: 09-414...

99

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

They paid special attention to the number of consecutive two- and three-day rainfall extremes and regions with upward trends in extremes - especially regions with dense...

100

Report Title: Mapping  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

glass (1979) GLASPC15 GLASS1T Special glass (1979) YESNO15. NTANKS1T Number of tanks (1979) MISS3CH15 TOTCAP1T Total tank capacity (1979) MISS7CH15 IMPSF1T Imp. square...

102

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

"We're hoping that this demonstration stimulates enough interest among members of the public that it will become self-sustaining?growing the number of houses with deep retrofits."...

103

--No Title--  

Energy Savers [EERE]

of Acquisition Letter on Meal Costs in Management and Operation Contracts SUMMARY: This AL is a reissuance (under the new AL number of 2012-05) of the AL on Meal Costs in...

104

--No Title--  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

II: Heat Flux, Particle Control, PWI Session number 9 Session Chair: Steve Wukitch Task Force Leader: Brian LaBombard Day: 482009 Session start time: 10:50 Session end time:...

105

TITLE XVII Application Process  

Broader source: Energy.gov [DOE]

The Title XVII Innovative Clean Energy Projects (Title XVII) loan program is currently accepting applications in response to open technology-specific solicitations.

106

COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone  

Broader source: Energy.gov (indexed) [DOE]

TRANSPORTATION & WAREHOUSING TRANSPORTATION & WAREHOUSING COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Other Support Activities for Air Transportation 488190 Freight Transportation Arrangement 488510 General Warehousing and Storage 493110 NATIONAL RENEWABLE ENERGY LAB POC Nancy Gardner Telephone (303) 384-7335 Email nancy.gardner@nrel.gov Specialized Freight (except Used Goods) Trucking, Local 484220 ROCKY FLATS POC Telephone Email Specialized Freight (except Used Goods) Trucking, Long-Distance 484230 WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov General Freight Trucking, Local 484110 General Freight Trucking, Long-Distance, Truckload 484121 Specialized Freight (except Used Goods) Trucking, Local 484220 Specialized Freight (except Used Goods) Trucking, Long-Distance

107

EDUCATION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone  

Broader source: Energy.gov (indexed) [DOE]

EDUCATION EDUCATION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov Computer Training 611420 Professional and Management Development Training 611430 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone (925) 423-4535 Email swanson6@llnl.gov Computer Training 611420 Professional and Management Development Training 611430 COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Computer Training 611420 Professional and Management Development Training 611430 All Other Miscellaneous Schools and Instruction 611699 Educational Support Services 611710 NATIONAL RENEWABLE ENERGY LAB POC Nancy Gardner Telephone (303) 384-7335 Email nancy.gardner@nrel.gov Professional and Management Development Training 611430 DIST OF COLUMBIA

108

Plug's GenCore supports rural telephone network  

Science Journals Connector (OSTI)

The Oneida County rural telephone network in upstate New York is benefiting from backup power provided by a 5 kWe GenCore 5T48 fuel cell system supplied by Plug Power.

2004-01-01T23:59:59.000Z

109

UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone  

Broader source: Energy.gov (indexed) [DOE]

UTILITIES UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone (706) 213-3823 Email annc@sepa.doe.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OKLAHOMA SOUTHWESTERN POWER ADMIN POC Gary Bridges Telephone (918) 595-6671 Email gary.bridges@swpa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OREGON BONNEVILLE POWER ADMIN POC Greg Eisenach Telephone (360) 418-8063 Email gaeisenach@bpa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 PENNSYLVANIA NATIONAL ENERGY TECHNOLOGY LAB - PA POC Larry Sullivan

110

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

111

UNIVERSITY OF COLORADO BUFFALOES / SPORTS INFORMATION SERVICE www.CUBuffs.com Fieldhouse Annex #50, 357 UCB, Boulder, CO 80309-0357 --Telephone 303/492-5626 --david.plati@colorado.edu  

E-Print Network [OSTI]

, when Colorado won all five western meets en route to the NCAA title, this winter was topsyUNIVERSITY OF COLORADO BUFFALOES / SPORTS INFORMATION SERVICE www.CUBuffs.com Fieldhouse Annex #50, 357 UCB, Boulder, CO 80309-0357 -- Telephone 303/492-5626 -- david.plati@colorado.edu David Plati

Stowell, Michael

112

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

113

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

114

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

115

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

116

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

117

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

118

unknown title  

E-Print Network [OSTI]

A. Evidence for carcinogenicity to hum ans (sufficient) There have been a number of case reports of skin cancer in patients who used tar ointments for a variety of skin diseasesl,2. A mortality analysis in the UK from 1946 showed a greatly increased scrotal cancer risk for patent-fuel workers. Furthermore, a large number of case reports describe the development of skin (including the scrotum) cancer in workers exposed to coal-tars or coal-tar pitches (see p. 174)1. Several epidemiological studies have shown an excess of lung cancer among workers exposed to coal-tar fumes in coal gasification and coke production3.. One study showed a small excess of bladder cancer in tar distillers and in patent-fuel workers. An elevated risk of cancer of the renal pelvis was seen in workers exposed to 'petroleum or tar or pitch'l. One study of milwrights and welders exposed to coal-tars and coal-tar pitch in a stamping plant showed significant excesses of leukaemia and of cancers of the lung and digestive organs5. B. Evidence for carcinogenicity to animaIs (suffcient) Coal-tars from blast furnaces, coke ovens and co al gasification plants, as well as

unknown authors

119

Administration Policy Complete Policy Title  

E-Print Network [OSTI]

Administration Policy Complete Policy Title: McMaster University Alcohol Policy Policy Number, 1998 Supersedes/Amends Policy dated: May 11, 1998 Responsible Executive: Vice-President (Administration policy and the written copy held by the policy owner, the written copy prevails. INTRODUCTION Mc

Haykin, Simon

120

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

122

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

123

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

124

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

125

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

126

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

127

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

128

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

129

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

130

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Geologic Geologic Characterization of the Triassic Newark Basin of Southeastern New York and Northern New Jersey (DE-FE0002352) Daniel J. Collins, PG, RG Sandia Technologies, LLC U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 * Acknowledgment: This material is based upon work supported by the Department of Energy [National Energy Technology Laboratory] under Award Number DE- FE0002352, Contract No. 18131 from the New York State Energy Research & Development Authority [NYSERDA], and "In Kind" Cost Share from Schlumberger Carbon Services, Weatherford Laboratories, National Oilwell Varco, New York State Museum, and Rutgers University.

131

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

132

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

133

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

134

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

135

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

136

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

137

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

138

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

139

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

140

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

142

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

143

Project Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

144

Title, Location, Document Number Estimated Cost Description  

Broader source: Energy.gov (indexed) [DOE]

1/23/2013 1/23/2013 Transmittal to State: TBD EA Approval: TBD FONSI: TBD EA Determination Date: Transmittal to State: EA Approval: FONSI: EA Determination Date: Transmittal to State: EA Approval: FONSI: EA Determination Date: Transmittal to State: EA Approval: FONSI: EA Determination Date: Transmittal to State: EA Approval: FONSI: Total Estimated Cost $0 Office of Legacy Management Jan-13 Annual NEPA Planning Summary Evaluation of Proposed Grazing on the Maybell and Maybell West UMTRCA sites, Colorado TBD DOE is seeking reuse of the lands associated with the Maybell and Maybell West UMTRCA disposal sites in Moffat County, in northwestern Colorado. Potential impacts from grazing would be evaluated in this EA. The schedule and costs have yet to be determined since EA determination was recently made.

145

Title, Location, Document Number Estimated Cost Description  

Broader source: Energy.gov (indexed) [DOE]

5/9/2011 5/9/2011 Transmittal to State: 2/3/2012 EA Approval: 5/1/2012 FONSI: 5/1/2012 Determination Date: 4/15/2010 Transmittal to State: N/A EA Approval: N/A FONSI: N/A EA Determination Date: 9/1/2009 Transmittal to State: 12/10/2010 EA Approval: FONSI: EA Determination Date: 5/15/2010 Transmittal to State: EA Approval: FONSI: Determination Date: 7/28/2009 Transmittal to State: EA Approval: FONSI: EA Determination Date: 12/20/2010 Transmittal to State: EA Approval: FONSI: Determination Date: 12/17/2010 Transmittal to State: N/A EA Approval: N/A FONSI: N/A EA Determination Date: Transmittal to State: EA Approval: FONSI: NewPage Proposed Wood Biomass-to-Liquid Fule Biorefinery, Wisconsin Rapids, Wisconsin (DOE/EA-1811) 100,000 This EA is on hold. Cloud County Community College: Wind Energy Project, Kansas (DOE/EA-1852)

146

Policy Title: Policy Number: Use of University  

E-Print Network [OSTI]

confiscation of the goods, financial penalties, and legal action. The university charges a royalty fee the royalty requirement. Promotional items ­ These are items bearing a UC trademark purchased to promote of licensing, it may be exempted from the royalty requirement. #12;University of Cincinnati Trademarks

Papautsky, Ian

147

COASTAL CHARTS Stock Number Title Scale =1  

E-Print Network [OSTI]

,000,000 81002 Caroline Islands-Westem Part (OMEGA) 1,000,000 81007 Bikini Atoll to Mili Atoll (OMEGA) 1

Russell, Lynn

148

unknown title  

E-Print Network [OSTI]

THE GOAL OF PROJECT APOLLO, to place a man on the surfaceof the Moon and return him safely to Earth, was a task for engineering and technology. The resultant transportation system was so robust in its capability that a rich scientific harvest also was gathered in the process. The visibility and magnitude of the Apollo program left the impression, even within the scientific community,that the major lunar scientific questions had been answered. Since the Surveyor project, NASA's unmanned planetary program has ignored the Moon, preferring to concentrate its admittedly limited resources on other bodies in the solar system. In 1972,lunar scientists proposed launching a remote-sensing satellite into lunar polar orbit. Carrying a small number of geochemical and geophysical sensors,the Lunar Polar Orbiter (LBO)was designed to expand to global coverage the limited Apollo orbital science data set. Remote-sensing information from the orbiting Service Modules of Apollos 15, 16,and 17 had been invaluable in revealing the scale and extent of the planetary processes whose nature and timing were decoded in analyses of the returned samples. Low orbital inclination and limited time at the Moon resulted in tantalizingly

unknown authors

149

JOB NUMBER  

Broader source: Energy.gov (indexed) [DOE]

. . . . . . . . . .: LEAVE BLANK (NARA use only) JOB NUMBER N/-&*W- 9d - 3 DATE RECEIVED " -1s - 9 J - NOTIFICATION TOAGENCY , In accordance with the provisions of 44 U.S.C. 3303a the disposition request. including amendments, is ap roved except , . l for items that may be marke,, ,"dis osition not approved" or "withdrawn in c o i m n 10. 4. NAME OF PERSON WITH WHOM TO CONFER 5 TELEPHONE Jannie Kindred (202) 5&-333 5 - 2 -96 6 AGENCYCERTIFICATION -. ~ - I hereby certify that I am authorized to act for this agency in matters pertaining to the disposition of its records and that the records roposed for disposal are not now needed for the business of this agency or wiRnot be needed after t G t r & s s d ; and that written concurrence from

150

Telephoning for Energy Efficiency in Vermont | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Telephoning for Energy Efficiency in Vermont Telephoning for Energy Efficiency in Vermont Telephoning for Energy Efficiency in Vermont November 8, 2010 - 3:59pm Addthis Eldred French had the basement in his home (pictured above) insulated and sealed by local contractors. | Photo Courtesy of NWWVT Eldred French had the basement in his home (pictured above) insulated and sealed by local contractors. | Photo Courtesy of NWWVT Stephen Graff Former Writer & editor for Energy Empowers, EERE Most telethons raise money for charities or events and have local celebrities and even dancing children. But the subdued, small telethon in Shrewsbury, Vt., in a unique twist, didn't ask for money: town volunteers offered up a home energy audit-at a fraction of the typical cost-to the person on the other end to help

151

CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTATIVE / WASTE / REMEDIATION ADMINISTATIVE / WASTE / REMEDIATION CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov Security Systems Services (except Locksmiths) 561621 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone (925) 423-4535 Email swanson6@llnl.gov Security Systems Services (except Locksmiths) 561621 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov Facilities Support Services 561210 Employment Placement Agencies 561311 Temporary Help Services 561320 Professional Employer Organizations 561330 Document Preparation Services 561410 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths)

152

Alaska Power and Telephone Co | Open Energy Information  

Open Energy Info (EERE)

and Telephone Co and Telephone Co (Redirected from Alaska Power Co) Jump to: navigation, search Name Alaska Power and Telephone Co Place Washington Utility Id 219 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Sch No. A1-(Residential & Small Commercial Rates) Residential Sch No. A2-(Bulk Power Rates) Commercial

153

Alaska Power and Telephone Co | Open Energy Information  

Open Energy Info (EERE)

Telephone Co Telephone Co Jump to: navigation, search Name Alaska Power and Telephone Co Place Washington Utility Id 219 Utility Location Yes Ownership I NERC Location AK Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Activity Retail Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Sch No. A1-(Residential & Small Commercial Rates) Residential Sch No. A2-(Bulk Power Rates) Commercial Sch No. A3-(Bulk Power Rates for Large Customers)

154

Telephoning for Energy Efficiency in Vermont | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Telephoning for Energy Efficiency in Vermont Telephoning for Energy Efficiency in Vermont Telephoning for Energy Efficiency in Vermont November 8, 2010 - 3:59pm Addthis Eldred French had the basement in his home (pictured above) insulated and sealed by local contractors. | Photo Courtesy of NWWVT Eldred French had the basement in his home (pictured above) insulated and sealed by local contractors. | Photo Courtesy of NWWVT Stephen Graff Former Writer & editor for Energy Empowers, EERE Most telethons raise money for charities or events and have local celebrities and even dancing children. But the subdued, small telethon in Shrewsbury, Vt., in a unique twist, didn't ask for money: town volunteers offered up a home energy audit-at a fraction of the typical cost-to the person on the other end to help

155

SBOT OHIO EM BUSINESS CENTER POC Karen Bahan Telephone  

Broader source: Energy.gov (indexed) [DOE]

OHIO OHIO EM BUSINESS CENTER POC Karen Bahan Telephone (513) 246-0555 Email karen.bahan@emcbc.doe.gov ADMINISTATIVE / WASTE / REMEDIATION Office Administrative Services 561110 Facilities Support Services 561210 Employment Placement Agencies 561311 Executive Search Services 561312 Temporary Help Services 561320 Professional Employer Organizations 561330 Document Preparation Services 561410 Telephone Answering Services 561421 Court Reporting and Stenotype Services 561492 All Other Business Support Services 561499 Travel Agencies 561510 All Other Travel Arrangement and Reservation Services 561599 Investigation Services 561611 Security Guards and Patrol Services 561612 Armored Car Services 561613 Security Systems Services (except Locksmiths) 561621 Locksmiths 561622 Exterminating and Pest Control Services

156

CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone  

Broader source: Energy.gov (indexed) [DOE]

PROFESSIONAL / SCIENTIFIC / TECHNICAL PROFESSIONAL / SCIENTIFIC / TECHNICAL CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov Engineering Services 541330 Drafting Services 541340 Geophysical Surveying and Mapping Services 541360 Testing Laboratories 541380 Custom Computer Programming Services 541511 Computer Systems Design Services 541512 Other Computer Related Services 541519 Administrative Management and General Management Consulting Services 541611 Other Scientific and Technical Consulting Services 541690 Research and Development in Biotechnology 541711 Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) 541712 All Other Professional, Scientific, and Technical Services 541990 LAWRENCE LIVERMORE LAB POC Jill Swanson Telephone

157

TANK DEIS TITLE PG.psd  

Broader source: Energy.gov (indexed) [DOE]

Cover Sheet Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site High-Level Waste Tank Closure Environmental Impact Statement (DOE/EIS-0303), Aiken, South Carolina CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 730B, Room 2418 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov For general information on DOE's National Environmental Policy Act (NEPA), write or call: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

158

TANK DEIS SUMMARY TITLE PG.psd  

Broader source: Energy.gov (indexed) [DOE]

Summary Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site High-Level Waste Tank Closure Environmental Impact Statement (DOE/EIS-0303), Aiken, South Carolina. CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 730B, Room 2418 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov For general information on DOE's National Environmental Policy Act (NEPA) process, write or call: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

159

Flyer, Title VI  

Broader source: Energy.gov [DOE]

Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance.

160

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

162

SBOT SOUTH CAROLINA SAVANNAH RIVER LAB POC Sharon Campbell Telephone  

Broader source: Energy.gov (indexed) [DOE]

SOUTH CAROLINA SOUTH CAROLINA SAVANNAH RIVER LAB POC Sharon Campbell Telephone (800) 888-7986 Email sharon-pmmd.campbell@srs.gov EDUCATION Professional and Management Development Training 611430 GOODS Motor Vehicle Supplies and New Parts Merchant Wholesalers 423120 Tire and Tube Merchant Wholesalers 423130 Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers 423310 Photographic Equipment and Supplies Merchant Wholesalers 423410 Office Equipment Merchant Wholesalers 423420 Computer and Computer Peripheral Equipment and Software Merchant Wholesalers 423430 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 423610 Warm Air Heating and Air-Conditioning Equipment and Supplies Merchant Wholesalers

163

SBOT IDAHO IDAHO LAB POC Stacey Francis Telephone  

Broader source: Energy.gov (indexed) [DOE]

IDAHO IDAHO IDAHO LAB POC Stacey Francis Telephone (208) 526-8564 Email stacey.francis@inl.gov CONSTRUCTION Industrial Building Construction 236210 All Other Specialty Trade Contractors 238990 GOODS Motor Vehicle Supplies and New Parts Merchant Wholesalers 423120 Tire and Tube Merchant Wholesalers 423130 Office Equipment Merchant Wholesalers 423420 Other Commercial Equipment Merchant Wholesalers 423440 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 423610 Industrial Machinery and Equipment Merchant Wholesalers 423830 Industrial Supplies Merchant Wholesalers 423840 Transportation Equipment and Supplies (except Motor Vehicle) Merchant Wholesalers 423860 Other Miscellaneous Durable Goods Merchant Wholesalers

164

SBOT NEW MEXICO CARLSBAD FIELD OFFICE POC Roland Taylor Telephone  

Broader source: Energy.gov (indexed) [DOE]

MEXICO MEXICO CARLSBAD FIELD OFFICE POC Roland Taylor Telephone Email roland.taylor@wipp.ws ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Employment Placement Agencies 561311 Temporary Help Services 561320 Professional Employer Organizations 561330 Document Preparation Services 561410 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Janitorial Services 561720 Landscaping Services 561730 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 Materials Recovery Facilities 562920 All Other Miscellaneous Waste Management Services 562998 CONSTRUCTION Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Power and Communication Line and Related Structures Construction

165

SBOT ILLINOIS ARGONNE LAB POC Karl Duke Telephone  

Broader source: Energy.gov (indexed) [DOE]

ILLINOIS ILLINOIS ARGONNE LAB POC Karl Duke Telephone (630) 252-8842 Email sblo@anl.gov ADMINISTATIVE / WASTE / REMEDIATION Security Systems Services (except Locksmiths) 561621 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 CONSTRUCTION All Other Specialty Trade Contractors 238990 EDUCATION Computer Training 611420 Professional and Management Development Training 611430 GOODS Photographic Equipment and Supplies Merchant Wholesalers 423410 Computer and Computer Peripheral Equipment and Software Merchant Wholesalers 423430 Other Commercial Equipment Merchant Wholesalers 423440 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 423610 Electrical and Electronic Appliance, Television, and Radio Set Merchant Wholesalers

166

GOODS CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone  

Broader source: Energy.gov (indexed) [DOE]

GOODS GOODS CALIFORNIA LAWRENCE BERKELEY LAB POC David Chen Telephone (510) 486-4506 Email dtchen@lbl.gov Photographic Equipment and Supplies Merchant Wholesalers 423410 Computer and Computer Peripheral Equipment and Software Merchant Wholesalers 423430 Other Commercial Equipment Merchant Wholesalers 423440 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 423610 Electrical and Electronic Appliance, Television, and Radio Set Merchant Wholesalers 423620 Other Electronic Parts and Equipment Merchant Wholesalers 423690 Industrial Machinery and Equipment Merchant Wholesalers 423830 Industrial Supplies Merchant Wholesalers 423840 Other Miscellaneous Durable Goods Merchant Wholesalers

167

SBOT IOWA AMES LAB POC Lisa Rodgers Telephone  

Broader source: Energy.gov (indexed) [DOE]

IOWA IOWA AMES LAB POC Lisa Rodgers Telephone (515) 294-4191 Email rodgers@ameslab.gov GOODS Photographic Equipment and Supplies Merchant Wholesalers 423410 Computer and Computer Peripheral Equipment and Software Merchant Wholesalers 423430 Other Commercial Equipment Merchant Wholesalers 423440 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 423610 Electrical and Electronic Appliance, Television, and Radio Set Merchant Wholesalers 423620 Other Electronic Parts and Equipment Merchant Wholesalers 423690 Industrial Machinery and Equipment Merchant Wholesalers 423830 Industrial Supplies Merchant Wholesalers 423840 Other Miscellaneous Durable Goods Merchant Wholesalers

168

SBOT COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone  

Broader source: Energy.gov (indexed) [DOE]

COLORADO COLORADO GOLDEN FIELD OFFICE POC Karen Downs Telephone (720) 356-1269 Email karen.downs@go.doe.gov ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Employment Placement Agencies 561311 Temporary Help Services 561320 Professional Employer Organizations 561330 Document Preparation Services 561410 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Janitorial Services 561720 Landscaping Services 561730 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 Materials Recovery Facilities 562920 All Other Miscellaneous Waste Management Services 562998 CONSTRUCTION Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Power and Communication Line and Related Structures Construction

169

SBOT TEXAS PANTEX PLANT POC Brad Beck Telephone  

Broader source: Energy.gov (indexed) [DOE]

TEXAS TEXAS PANTEX PLANT POC Brad Beck Telephone (806) 477-6192 Email bbrack@pantex.com ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Executive Search Services 561312 Temporary Help Services 561320 Document Preparation Services 561410 All Other Business Support Services 561499 Travel Agencies 561510 Security Systems Services (except Locksmiths) 561621 Landscaping Services 561730 Carpet and Upholstery Cleaning Services 561740 Other Services to Buildings and Dwellings 561790 Solid Waste Collection 562111 Hazardous Waste Collection 562112 Other Waste Collection 562119 Hazardous Waste Treatment and Disposal 562211 Solid Waste Landfill 562212 Solid Waste Combustors and Incinerators 562213 Other Nonhazardous Waste Treatment and Disposal 562219 Remediation Services 562910 Materials Recovery Facilities

170

SBOT WYOMING ROCKY MOUNTAIN OILFIELD CENTER POC Jenny Krom Telephone  

Broader source: Energy.gov (indexed) [DOE]

WYOMING WYOMING ROCKY MOUNTAIN OILFIELD CENTER POC Jenny Krom Telephone (307) 233-4818 Email jenny.krom@rmotc.doe.gov ADMINISTATIVE / WASTE / REMEDIATION Office Administrative Services 561110 Facilities Support Services 561210 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Solid Waste Collection 562111 Hazardous Waste Collection 562112 Other Waste Collection 562119 Hazardous Waste Treatment and Disposal 562211 Solid Waste Landfill 562212 Solid Waste Combustors and Incinerators 562213 Other Nonhazardous Waste Treatment and Disposal 562219 Remediation Services 562910 Materials Recovery Facilities 562920 All Other Miscellaneous Waste Management Services 562998

171

SBOT VIRGINIA THOMAS JEFFERSON LAB POC Danny Llyod Telephone  

Broader source: Energy.gov (indexed) [DOE]

VIRGINIA VIRGINIA THOMAS JEFFERSON LAB POC Danny Llyod Telephone (757) 269-7121 Email lloyd@jlab.org ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Employment Placement Agencies 561311 Travel Agencies 561510 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Landscaping Services 561730 Carpet and Upholstery Cleaning Services 561740 Hazardous Waste Collection 562112 CONSTRUCTION Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Water and Sewer Line and Related Structures Construction 237110 Power and Communication Line and Related Structures Construction 237130 Highway, Street, and Bridge Construction 237310 Other Heavy and Civil Engineering Construction 237990 Other Foundation, Structure, and Building Exterior Contractors

172

SBOT WASHINGTON PACIFIC NORTHWEST LAB POC Kerry T. Bass Telephone  

Broader source: Energy.gov (indexed) [DOE]

WASHINGTON WASHINGTON PACIFIC NORTHWEST LAB POC Kerry T. Bass Telephone (509) 371-7526 Email kerry.bass@pnl.gov ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Employment Placement Agencies 561311 Temporary Help Services 561320 Professional Employer Organizations 561330 Document Preparation Services 561410 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Janitorial Services 561720 Landscaping Services 561730 Hazardous Waste Treatment and Disposal 562211 Remediation Services 562910 Materials Recovery Facilities 562920 All Other Miscellaneous Waste Management Services 562998 Office machine repair and maintenance services (except communication equipment) 811212 Communication equipment repair and maintenance services 811213 Precision equipment calibration and repair and maintanence services

173

SBOT MISSOURI KANSAS CITY PLANT POC C. J. Warrick Telephone  

Broader source: Energy.gov (indexed) [DOE]

MISSOURI MISSOURI KANSAS CITY PLANT POC C. J. Warrick Telephone (816) 997-2874 Email cwarrick@kcp.com ADMINISTATIVE / WASTE / REMEDIATION Office Administrative Services 561110 Facilities Support Services 561210 Executive Search Services 561312 Temporary Help Services 561320 Document Preparation Services 561410 All Other Business Support Services 561499 Travel Agencies 561510 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Landscaping Services 561730 Carpet and Upholstery Cleaning Services 561740 Other Services to Buildings and Dwellings 561790 Solid Waste Collection 562111 Hazardous Waste Collection 562112 Other Waste Collection 562119 Hazardous Waste Treatment and Disposal

174

SBOT NEVADA NEVADA SITE OFFICE POC Anita Ross Telephone  

Broader source: Energy.gov (indexed) [DOE]

NEVADA NEVADA NEVADA SITE OFFICE POC Anita Ross Telephone (702) 295-5690 Email rossal@nv.doe.gov ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 All Other Business Support Services 561499 Security Guards and Patrol Services 561612 Security Systems Services (except Locksmiths) 561621 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Other Services to Buildings and Dwellings 561790 Hazardous Waste Collection 562112 Other Waste Collection 562119 Hazardous Waste Treatment and Disposal 562211 Solid Waste Combustors and Incinerators 562213 Remediation Services 562910 All Other Miscellaneous Waste Management Services 562998 CONSTRUCTION Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220

175

SBOT GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone  

Broader source: Energy.gov (indexed) [DOE]

GEORGIA GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone (706) 213-3823 Email annc@sepa.doe.gov ADMINISTATIVE / WASTE / REMEDIATION Office Administrative Services 561110 Facilities Support Services 561210 Security Systems Services (except Locksmiths) 561621 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Landscaping Services 561730 Other Nonhazardous Waste Treatment and Disposal 562219 Remediation Services 562910 CONSTRUCTION Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Water and Sewer Line and Related Structures Construction 237110 Power and Communication Line and Related Structures Construction 237130 Other Heavy and Civil Engineering Construction 237990 Other Foundation, Structure, and Building Exterior Contractors

176

SBOT NEW JERSEY PRINCETON PLASMA LAB POC Arlene White Telephone  

Broader source: Energy.gov (indexed) [DOE]

JERSEY JERSEY PRINCETON PLASMA LAB POC Arlene White Telephone (609) 243-2080 Email awhite@pppl.gov ADMINISTATIVE / WASTE / REMEDIATION Facilities Support Services 561210 Employment Placement Agencies 561311 Travel Agencies 561510 Locksmiths 561622 Exterminating and Pest Control Services 561710 Janitorial Services 561720 Landscaping Services 561730 Carpet and Upholstery Cleaning Services 561740 Hazardous Waste Collection 562112 CONSTRUCTION Industrial Building Construction 236210 Commercial and Institutional Building Construction 236220 Water and Sewer Line and Related Structures Construction 237110 Power and Communication Line and Related Structures Construction 237130 Highway, Street, and Bridge Construction 237310 Other Heavy and Civil Engineering Construction 237990 Other Foundation, Structure, and Building Exterior Contractors

177

Global Environmental Course Title  

E-Print Network [OSTI]

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

178

A Study of the Security Problems Associated with the Telephone Network  

E-Print Network [OSTI]

---------------------------------------------------------------------------------------------3 2.2 A Short History of Telephone Hacking the network's signaling mechanisms. The focus has now shifted to PBX hacking and the use of Extenders

179

Policy Title: Human Subject Responsible Office: UFS  

E-Print Network [OSTI]

Policy Title: Human Subject Payments Responsible Office: UFS HARVARD UNIVERSITY FINANCIAL POLICY Effective Date: 1/1/11 Revision Date: N/A HUMAN SUBJECT PAYMENTS Policy Number TAX102 HARVARD UNIVERSITY FINANCIAL POLICY POLICY STATEMENT Individuals conducting Harvard research studies that compensate human

Chen, Yiling

180

COURSE INFORMATION: Title: Fly Fishing Weekend  

E-Print Network [OSTI]

COURSE INFORMATION: Title: Fly Fishing Weekend Department/Number: NONC F040 F01 Credits: 0 to the art and science of fly casting, fishing and tying. Students will learn how use a fly rod to place a fly with pinpoint accuracy, tie fishing knots and construct their own leaders, and, most importantly

Sikes, Derek S.

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network [OSTI]

PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop and Implement a Pilot Status and Trend Monitoring Program BPA reduced budget by $250,000 to reflect duplicate NPCC tier 2. NPCC budget reflects an assumption of a capital determination for some components; BPA has

182

Instructor: Ann Jablon Boston University Washington Legislative Internship Program Home Telephone Number (301) 654-5111  

E-Print Network [OSTI]

/11 The Legislative Process How a bill becomes a law - the intricacies. U.S. House - protection of majority rights vs. U.S. Senate - and minority rights; The Rules Committee vs. Unanimous Consent Readings: How Congress. Midterm Due! Monday, 3/4 Campaigns and Elections A discussion of issues including the role of PACs, soft

Goldberg, Bennett

183

TITLE48CHAPTER9  

Broader source: Energy.gov (indexed) [DOE]

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

184

Psychology OFFICE: Life Sciences 110 In the College of Sciences TELEPHONE: (619) 594-5358  

E-Print Network [OSTI]

348 Psychology OFFICE: Life Sciences 110 In the College of Sciences TELEPHONE: (619) 594-5358 UNDERGRADUATE ADVISING OFFICE: Life Sciences 116 TELEPHONE: (619) 594-5412 FAX: (619) 594-1332 WEB SITE: www.psychology by the Department Doctor of Philosophy degree in clinical psychology. Master of Arts degree in psychology. Master

Gallo, Linda C.

185

Title list of documents made publicly available  

SciTech Connect (OSTI)

The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes docketed material associated with civilian nuclear power plants and other uses of radioactive materials and nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued though the Department of Energy publication Power Reactor Docket Information, last published in January 1979.

Not Available

1991-01-01T23:59:59.000Z

186

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

187

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

188

Two Line Subject Title One Line Title  

Broader source: Energy.gov (indexed) [DOE]

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

189

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

190

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

191

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

192

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

193

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

194

Policy Title: Travel HARVARD UNIVERSITY FINANCIAL POLICY Responsible Office: UFS  

E-Print Network [OSTI]

Policy Title: Travel HARVARD UNIVERSITY FINANCIAL POLICY Responsible Office: UFS Effective Date: July 1, 2010 Revision Date: July 14, 2010TRAVEL Policy Number: TR104 HARVARD UNIVERSITY FINANCIAL POLICY POLICY STATEMENT Harvard University reimburses for necessary and reasonable travel expenses

195

No Slide Title | Department of Energy  

Energy Savers [EERE]

No Slide Title No Slide Title No Slide Title More Documents & Publications Slide 1 Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)-...

196

3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers  

SciTech Connect (OSTI)

This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.s and three (3) MScs, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

Malcolm J. Andrews

2006-04-14T23:59:59.000Z

197

Title of Presentation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Title of Presentation Title of Presentation More Documents & Publications Cybersecurity for Energy Delivery Systems 2010 Peer Review Presentations - Software Engineering...

198

Title Line 2 Commercialization at the  

E-Print Network [OSTI]

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

199

Social interactions across media: Interpersonal communication on the Internet, telephone and face-to-face  

E-Print Network [OSTI]

Two studies were conducted in this investigation to compare college students interpersonal interaction online, face-to-face, and on the telephone. Our first study, a communication diary, assessed the relative amount of ...

Baym, Nancy K.; Zhang, Yan Bing; Lin, Mei-Chen

2004-06-01T23:59:59.000Z

200

HMM/MLP hybrid speech recognizer for the Portuguese telephone SpeechDat corpus  

Science Journals Connector (OSTI)

In this article, we describe an automatic speech recognizer developed for Portuguese telephone speech. For this, we employed the Portuguese SpeechDat database which will be described in detail, giving its recording conditions, speaker characteristics ...

Astrid Hagen; Joo P. Neto

2003-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Weather and emotional state: a search for associations between weather and calls to telephone counseling services  

E-Print Network [OSTI]

Calls to four telephone counseling services, or "hotlines", each serving communities in a major metropolitan area of the United States (Detroit, Washington DC, Dallas and Seattle), were analyzed for influence from daily weather. Associations...

Stillman, Daniel Noah

2012-06-07T23:59:59.000Z

202

Presentation title goes here  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future of DR Future of DR March 3, 2011 Sila Kiliccote, Mary Ann Piette, Dave Watson, Rish Ghatikar Deputy, DRRC Program Manager, LBNL SKiliccote@lbl.gov 2 Presentation Overview * Trends * Policy * Technology * Implementations * Load As Resource in Ancillary Services Markets * Future directions towards responsive buildings 3 Trends Policy Dynamic Rates - Large C&I, residential, small commercial Codes and Standards -Title 24, US Green Building Council's LEED Credits Smart Grid Standards effort Ancillary Services Technology Integration of Renewables Energy Storage Technologies - Can DR replace storage? PHEVs and EVs Implementation Linking Energy Efficiency and DR Utility Implementations Smart Grid Investment and Demonstration Grants 4 Demand Side Management and Automated DR Future

203

Faculty/Topics Telephone Grade Level Dr. Jean Boal 871-4773  

E-Print Network [OSTI]

Faculty/Topics Telephone Grade Level Dr. Jean Boal 871-4773 Cephalopods 7-12 Dr. Susan Di-3076 Mosquitoes 1-12 Dr. Daniel Yocom 872-3338 Mycorrhizae 7-12 Mushrooms and Fungi 1-6 Dr. Yuan Zhong 871/Topics Telephone Grade Level Dr. Alex DeCaria 871-4739 Lighning 1-12 Thunderstorms and Tornadoes 1-12 Hurricanes

Hardy, Christopher R.

204

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

205

Two Line Subject Title One Line Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Carbon Sequestration Atlas of the Carbon Sequestration Atlas of the United States and Canada Dawn Deel, Project Manager, Sequestration Division October 5, 2010 2 Background and Statistics Atlas I - March 2007 * First coordinated assessment of CCS in the US and Canada * Provided maps showing number, location and magnitude of CO 2 sources * Maps showing areal extent of geologic storage sites * Storage potential by Partnership * Digital Atlas developed * Over 3,000 hardcopies released: 1,000 CDs mailed * Daily downloads from NETL website Atlas II - November 2008 * Updated the CO 2 storage portfolio * Documented differences in CO 2 resource and CO 2 capacity * Provided CO 2 emission estimation for stationary sources * Described Interagency collaboration * Illustrated federal lands CO 2 geologic storage potential

206

Title 44 Excerpts  

Broader source: Energy.gov (indexed) [DOE]

4 Excerpts 4 Excerpts The United States Code - Title 44 PUBLIC PRINTING AND DOCUMENTS And Miscellaneous Statutes Identify the Authority of the Joint Committee on Printing 1997 EDITION CHAPTER 5 - PRODUCTION AND PROCUREMENT OF PRINTING AND BINDING Section 501. Government printing, and blank-book work for Congress, the Executive Office, the Judiciary, other than the Supreme Court of the United States, and every executive department, independent office and establishment of the Government, shall be done at the Government Printing Office, except- (1) classes of work the Joint Committee on Printing considers to be urgent or necessary to have done elsewhere; and (2) printing in field printing plants operated by an executive department, independent office of establishment, and the procurement of printing by an executive department,

207

Title IX | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

IX IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to learn more: 20 U.S.C. § 1681(a) The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title IX, investigating Title IX-related complaints, and providing technical assistance related to Title IX to recipients of Department of Energy financial assistance.

208

1. Identification Number: 2. Program/Project Title: 3. Recipient  

E-Print Network [OSTI]

period. O - Other; See instructions for further details. 5. Special Instructions: DOE F 4600.2 (03 with appropriate DOE F 241 forms available at https://www.osti.gov/elink/index.jsp ) Report/Product Form Final Scientific/Technical Report DOE F 241.3 Conference papers/proceedings DOE F 241.3 Software/Manual DOE F 241

209

Policy Statement Number: PS-49 Title/Topic: Building Coordinator  

E-Print Network [OSTI]

. 10. Report all landscape maintenance problems, including drainage problems or grounds upkeep group responsible for coordinating maintenance requests and activities within that building or building Coordinators are responsible for coordinating maintenance requests and activities within the building

Harms, Kyle E.

210

**Volume Title** ASP Conference Series, Vol. **Volume Number**  

E-Print Network [OSTI]

, Switzerland 3Indian Institute of Astrophysics, Bangalore 560 034, India 4MPI f¨ur Sonnensystemforschung, D: at A we are further inside the disk than at B. Thus the µ = cos value for each point along the slit the spatial direction. The only point where the slit is exactly parallel to the solar limb is point A (see Fig

211

Course Number: 7120 Course Title: Introduction to Environmental Health  

E-Print Network [OSTI]

. It also addresses environmental health applications and domains such as water quality, air pollution and fate of pollutants, exposure and risk assessment, epidemiology, toxicology, and environmental policy to environmental health stressors including heavy metals, pesticides, radiation, organic pollutants, among others

Dasgupta, Dipankar

212

**Volume Title** ASP Conference Series, Vol. **Volume Number**  

E-Print Network [OSTI]

such as the existence of a minimum energy state for the particles. The implications of each of these are discussed) as a numerical method -- in particular the key differences between SPH and more standard grid based approaches dissipation, exact conservation and more subtle properties that arise from its Hamiltonian formulation

Price, Daniel

213

**Volume Title** ASP Conference Series, Vol. **Volume Number**  

E-Print Network [OSTI]

emission are excellent diagnostic probes to study energy release in magnetized stellar coronae. Solar-0440, USA 6Centro de Radioastronom´ia y Astrof´isica, Universidad Nacional Aut´onoma de M´exico, Apartado Postal 3-72, 58090, Morelia, Michoac´an, Mexico Abstract. This splinter session was devoted to review our

214

**Volume Title** ASP Conference Series, Vol. **Volume Number**  

E-Print Network [OSTI]

. The telescopes have a Pfund optical design with 1.65 m diameter primary mirrors mounted in movable semi). Hotspots are predicted to arise from large convection cells on the surface (Schwarzschild 1975). ISI

California at Berkeley, University of

215

Policy Title: Policy Number: Relocation Expenses 2.1.26  

E-Print Network [OSTI]

for the employee and family members, which may include: o Actual cost of gas, tolls, and parking, based on original types below.) Payment occurs on the next payroll cycle subject to published payroll production deadlines vehicles not used in the move · The cost of shipping pets · The cost of packing supplies · Insurance

Papautsky, Ian

216

Title VI | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

VI VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title VI, investigating Title VI-related complaints, and providing technical assistance to recipients of Department of Energy financial assistance. The Department has promulgated regulations that

217

Session Title Climate Smart Agriculture  

E-Print Network [OSTI]

Session Title Climate Smart Agriculture Session Date Khosla (moderator) Professor, Soil and Crop Sciences College of Agricultural Climate Smart Agriculture is a multi-disciplinary approach to practice agriculture

Barnes, Elizabeth A.

218

Ris Ris-M-GiD Title and authors)  

E-Print Network [OSTI]

-^ooo Roskilde, Denmark Telephone: (03) 35 51 01« ext. 33*»« telex: INIS Descriptors CALIBRATION DOSE

219

E-Print Network 3.0 - authority supplement number Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Number: e-mail address: Title of Degree (s): Do you wish... address Number of duplicate Certificates to be sent to address below ... Source: Burnett, Gary - School of...

220

RIN Number 1904-AB68  

Broader source: Energy.gov (indexed) [DOE]

RULEMAKING TITLE: Federal Procurement of Energy Efficient Products RULEMAKING TITLE: Federal Procurement of Energy Efficient Products RIN NUMBER: 1904-AB68 CLOSING DATE: August 20, 2007 COMMENT NUMBER DATE RECEIVED/ DATE OF LETTER NAME & TITLE OF COMMENTATOR AFFILIATION & ADDRESS OF COMMENTATOR 1 ? 7/31/07 Edwin Pinero Federal Environmental Executive Office of the Federal Environmental Executive 1200 Pennsylvania Avenue, NW Mail Code 1600J Washington, DC 20460 2 8/8/07 (e-mail) Bob Null President Arkansas Lamp Manufacturing bnull@arkansaslamp.com 3 8/10/07 (e-mail) Dawn Gunning Environmental Program Manager Department of Justice Dawn.M.Gunning@usdoj.gov 4 8/14/07 8/14/07 Kyle Pitsor Vice President, Government Relations National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

City emergency "blue light" telephone (maintained by the city of Evanston)  

E-Print Network [OSTI]

Tennis Courts Tennis Courts City emergency "blue light" telephone (maintained by the city Football Center Byron S.Coon Sports Center ISABELLA STREET CENTRAL STREET ASHLANDAVENUE ASBURYAVENUE Gymnasium LINCOLN STREET COLFAX STREET DARTMOUTH PLACE NOYES STREET HAVEN STREET GARRETT PLACE LIBRARY PLACE

Reber, Paul J.

222

For further information telephone 1300 275 794 or see swinburne.edu.au Electric Vehicle Research  

E-Print Network [OSTI]

. Lightweighting There are significant cost advantages in lightweighting EVs, primarily because a lighter vehicleFor further information telephone 1300 275 794 or see swinburne.edu.au Electric Vehicle Research at Swinburne Swinburne University of Technology's Electric Vehicle Research Group is one of the leading groups

Liley, David

223

Mawl: Integrated Web and Telephone Service Creation David Atkins, Thomas Ball*  

E-Print Network [OSTI]

Mawl: Integrated Web and Telephone Service Creation David Atkins, Thomas Ball* Thomas Baran in a device- independent manner. PML is a markup language and middleware for controlling and pro- gramming language separates the speci cation of service logic from the speci cation of the user interface

Atkins, David

224

Infrastructure, biotech top African science summit agenda Roads, electricity, telephones and the internet  

E-Print Network [OSTI]

N E W S Infrastructure, biotech top African science summit agenda Roads, electricity, telephones, the public-private partnership known as the Gavi Alliance, had saved the lives of more than 2 million African of medical doctors, traditional healers and the private sector in Lusaka, Zambia. The meeting is part of his

Cai, Long

225

Annual Poster Session 2009 Titles and Presenters  

E-Print Network [OSTI]

Kolli Title: Genetic Variation in the Lecane luna from Populations in the Chihuahua desert. 9) Daniel

Fuentes, Olac

226

National Ignition Facility Title II Design Plan  

SciTech Connect (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

227

No Slide Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 These slides are updated on a monthly basis, as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. While every effort is made to present accurate and final data, data may change in subsequent months, as additional information becomes available and as later developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 LBNL Recordable Cases FY06 through August 31 FY08 0 1 2 3 4 5 6 7 8 9 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Number of Cases FY '06 Total = 37 Cases FY '07 Total = 48 Cases FY '08 Total To Date = 45 Cases 3 LBNL DART Cases FY06 through August 31 FY08 0 1 2 3 4 5 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Number of Cases FY '06 Total = 8 Cases

228

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network [OSTI]

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

229

No Slide Title  

Broader source: Energy.gov (indexed) [DOE]

BROOKHAVEN SCIENCE ASSOCIATES BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Risk Management Diane Hatton Associate Director, NSLS-II Project Support Division, BNL November 4, 2009 2 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * identify potential vulnerabilities/risks * determine their likelihood of occurring * assess their impact on the project technical, cost, and schedule baselines * determine activities that would reduce/mitigate the risk Consolidated risk entries to manageable numbers * execute a plan to accomplish these risk-reducing activities * risk reporting/tracking STEP 1 3 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * Bottom up Risk Analysis produced 407 Risk Register Entries * Mixture of risks (can be mitigated) and uncertainties (things beyond our control) * Repetition and redundancy (e.g. higher than usual inflation and exchange rate, out-year

230

Title Slide "Memorability and Invisibility  

E-Print Network [OSTI]

Title Slide 2002- "Memorability and Invisibility: A tale of two alarm clocks and other stories from. Disclaimer #12;v. 1.1, 26/Aug/2002, (slide 1 - 3). © L.Hatton, 2001- O Memorability and invisibility Mobile phone tariffs O Memorability and invisibility for defects: the dark side Overview #12;v. 1.1, 26

Hatton, Les

231

Childhood habit cough treated with consultation by telephone: a case report  

E-Print Network [OSTI]

which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Background: Childhood habit cough has been treated successfully by making suggestions that it can be stopped, desensitization techniques, use of distractors, provision of rewards, and selfhypnosis. All of these techniques have involved personal contact between a health care provider and a patient. Case presentation: A 5-year-old with cystic fibrosis was diagnosed with habit cough following evaluation by a pediatric pulmonologist and otolaryngologist. An expert in the treatment of habit cough provided instruction by telephone to the patient's mother regarding use of hypnotic techniques in this setting, which was associated with resolution of the cough within a week. Conclusion: As this report describes a single patient, it is possible that his improvement was unrelated to the given advice. Therefore, it remains to be seen whether therapy by telephone for habit cough is applicable widely. Background Childhood habit cough has been treated successfully by

Ran D Anbar

2009-01-01T23:59:59.000Z

232

Residential Lighting: Title 24 and Technology Update  

E-Print Network [OSTI]

Residential Lighting: Title 24 and Technology Update Best practices in lighting design to comply the development and deployment of energy-efficient lighting and daylighting technologies in partnership. Effectively apply the residential Title 24 Building Energy Efficiency Standards requirements specific

California at Davis, University of

233

EOTA - Business Form Document Title: Nonconformance Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 3 5 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 3 EOTA - Business Form Document Title: Nonconformance Report Document Number: F-015 Rev. 07_12-06 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-011, Nonconforming Material / Product Process Notify of Changes: EOTA Employees Referenced Document(s): N/A F-015 Nonconformance Report 07_1206.doc 07_1206 Page 2 of 3 Revision History: Rev. Description of Change A Initial Release 07_1206 Converted form F-015 to a Word Form. Changed layout of form. No content changes were done. C D E F-015 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 1 Nonconformance Report (NCR) General Information NCR # -

234

Research Highlights Sorted by Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J. A Bulk Parameterization of Giant Cloud Condensation Nuclei ARM Kogan, Y. A Climatology of Midlatitude Continental Cloud Properties and Their Impact on the Surface Radiation Budget ARM Dong, X. A Comparison of Integrated Water Vapor Sensors: WVIOP-96 ARM Liljegren, J. C. A Consistency Analysis of ARESE Aircraft Measurements ARM

235

Preventive Action Number:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 8 Preventive Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Preventive Action Report Planning Worksheet Document Number: F-018 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-018 Preventive Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 09_0924 Worksheet modified to reflect External Audit recommendation for identification of "Cause for Potential Nonconformance". Minor editing changes. 11_0414 Added Preventive Action Number block to match Q-Pulse

236

Preventive Action Number:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 7 Corrective Action Report Planning Worksheet 11_0414 1 of 3 EOTA - Business Form Document Title: Corrective Action Report Planning Worksheet Document Number: F-017 Rev 11_0414 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-008, Corrective/Preventive Action Notify of Changes: EOTA Employees Referenced Document(s): N/A F-017 Corrective Action Report Planning Worksheet 11_0414 2 of 3 Revision History: Rev. Description of Change 08_0613 Initial Release 11_0414 Added problem statement to first block. F-017 Corrective Action Report Planning Worksheet 11_0414 3 of 3 Corrective Action Report Planning Worksheet Corrective Action Number: Source: Details/Problem Statement: Raised By: Raised Date: Target Date:

237

Practical experience with Title V  

SciTech Connect (OSTI)

Having prepared numerous Title V permit applications and applications for synthetic minor status, the do`s and don`ts of this experience are evaluated. The philosophy for what goes into the application is reviewed, with special regard to the EPA {open_quotes}White Paper{close_quotes} on streamlining the process. The pros and cons of accepting and applying for synthetic minor status are evaluated.

Hoffnagle, G.F. [TRC Environmental, Windsor, CT (United States)

1996-12-31T23:59:59.000Z

238

GENERAL CHEMISTRY TEXTBOOK LIST ISBN Number  

E-Print Network [OSTI]

FALL 2013 GENERAL CHEMISTRY TEXTBOOK LIST Course Number ISBN Number Title of Text and/or Material Edition Author Publishers 11100 978-1-2591-9687-4 Introduction to Chemistry, 3rd ed. (packaged w 978-1-2591-6192-6 Chemistry, The Molecular Nature of Matter and Change, 6e (packaged w

Jiang, Wen

239

TITLE  

Office of Legacy Management (LM)

Description of the Formerly Utilized Description of the Formerly Utilized Sites Remedial Action Program United States Department o f Energy "This book w l r prepartd u a n account 01 wo* lporuond by m uency o f the Unhd Sutes Govrrnmrnt. N a l h r t the United StalrsGovrrnment nos i n y m y lhumf, rm any 01 lheh employees, makes any .nrrmly, u p m r or impkd, or arrunrr my I@ LirbHty or rcsponiibiiily for ihe rccutrcy. wmplaenm. 01 u ~ l u l n e ~ i of any intotnulion, mppmtur, p f d u c t , 01 p r o m s d i ~ l o w d , or rtprrlrntr that i s we MUM mi initlnp plivmdy omd rightr Refnrnce herein L o m y rpedfw wmmrcial produel, pmarr, o r s e n h by b a d e name, tr.demaR, mmufrctunr, or othcrurtrr, doer not mcnrrlly m n n h u u m its endoncmmt, rccommmdalion, or favorin# b y the United Stater Govmment or my y m ~ y thacol. The vi+ur and opiljOna o

240

TITLE  

Office of Legacy Management (LM)

J J a s 1. Besl President Force Control Industries 3664 Dixla H i 9 h p ~ Falrfleld, Ohio 45014 Dear Hr. Besl: With your consent,. the U.S. Dcpartwnt o f Energy (WE) conducted a r a d i o l q l l c a l survey a t the Former Associate A i r c r a f t Tool and Manufrcturlng Conpany s l t e i n Fairfield, Ohio. OOE has received the-auwey report frm i t s survey. contractor, Oak Rldge national Laboratory (OWL). Two copies o f the report are enclosed f o r your information and use. 71.5 report C 0 n ~ l ~ d e S that uranium i s present I n the f a c i l l t y I n excess of the ME guidelines f ~ r restdual r a d l o i c t i v e matertal. This conclusion i s based on d i r e c t radiation r a s u r a r n t s (shorn graphically on Flgures 8 , 9, 14, and Table 5 on pages 8, 9, 22, and 29, respectively) and om analysls o f s o i l samples, dust sllples, m

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

TITLE  

Office of Legacy Management (LM)

SHOAL AREA SHOAL AREA TRACER TEST EXPERlIMENT prepared by Rosemary Carrolt, Todd Mihevc, Greg Pohll, Brad Lyles, Sean Kosinski and Rich Niswonger submitted to Nevada Operations Office U.S. Department of Energy Las Vegas, Nevada NOVEMBER 2000 Publication No. 45177 Reference herein to any specific commercial pmduct, process, or service by trade name, trademark, mufacturer, or otherw~se, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. The views a d opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. This report has been reproduced directly from the best available copy.

242

TITLE  

Office of Legacy Management (LM)

- . ' R U L 000003 United States Office of Radiation and ~ ~ ~ - 4 0 2 7 ~ - 0 2 - 0 0 7 Environmental Protection 1ndoor Air November 2002 Agency Washington, DC 20460 &EPA Annual Water Sampling and Analysis, Calendar Year 2002: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2002 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Max G. Davis Terry L. Mouck Prepared for the U.S. Department of Energy under Interagency Agreement DE-AI08-96NV11969 RADIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

243

TITLE  

Office of Legacy Management (LM)

-. -. i . , . United States Government L-u+-tw / S / V ~ f Department of nersy memorandum D i T E June 0 5 , 1995 FEP-Y ATTK OF: EM-421 (U. A. Williams, 301-903-8149) SUGJECT Hazard Assessmnt f o r Radioactive Contamination a t the Associate. A i r c r a f t Site, F a i r f i e l d , Ohio To L. Price, OR This memorandum i s t o ' provide comments and approval o f the Associate i r ft i t n f o r e n ' i A r c a S eHazardAssessmet I d t i f e d S o i l C ~ m i n a t i o n . The hazard assessment was prepared and supplemental 1 i m i t s were requested, based on a single s o i l sample w i t h 134 picocuries per gran o f uranium. This sample was obtained from underneath the b u i l d i n g slab i n an area t h a t was a loading dock f o r the f a c i l i t y during Atomic Energy Comnission operations during the 1950s. The area i s n o t r e

244

TITLE  

Office of Legacy Management (LM)

amv. amv. I.. - - DESlON CRITERIA FOR f ORMERLV UTILIZISU 81TEb REMEDIAL ACTIUN PROORAM [FUmRAP) AND BURPLUS FACILITIES MANAOEMENT D E S I G N C R I T E R I A POR FORMERLY U T I L I Z E D S I T E S REHEDIAL ACTION PROGRAM (?USRAP). AlPD SURPLUS FACILITIES MUINAGEHEIT P R O C R U (SFHP) ( I S S U E D FOR C L I E N T APPROVAL) FEBRUARY 1 9 8 6 ~pproved by: a . CI, Director 2- 24-86 Date T e c h n i c a l Services Division Oak RiPge Operations Office Approved by: 2-24-86 Date Construction and E n g i n e e r i n g Oak Ridge Operations Office 14501-00-DC-01 Rev. 1 PREFACE TO DESIGN CRITERIA T h t s t drsiqn criteria have barn-written i n a generic form that sunmarizes criteria applicable for remedial action and long-term mmagcnent activities associated with the radioactive vaster at the fDSRhP end S?HP sites. Site-specific Information is provided in the

245

TITLE  

Office of Legacy Management (LM)

Mi Mi w u United S taies Office of Radiation a ~ d EPA 8 Environmental Protection Indoor Air Dcccmbcr 1999 Q Agency Washington, DC 304hC) EPA-402-R-93-0 12 Q w 0 4 : 0 0 0 4 &€PA Annual Water Samp and Analysis Ca endar Year 1999: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 1999 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AIO8-96NVl1969 FL4DIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

246

TITLE  

Office of Legacy Management (LM)

Post-Remedial Action Report Post-Remedial Action Report for the Alba Craft Site and Vicinity Properties Oxford , Ohio August 1995 POST-REMEDIAL ACTION REPORT FOR THE A D A CRAFT SITE AND VICINITY PROPERTIES OXFORD, OHIO AUGUST 1995 Prepared f o ~ United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACO5-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

247

TITLE  

Office of Legacy Management (LM)

, , - :. , L L b ' pi1 2 25. STATE OF MISSISSIPPI a . a . , i l l ; .. - . a ,-. , I , SALMON SITE , , , . . . C I A . - - 1 COUNTY OF LAMAR - T - TRACT NO. 101-E KNOW ALL MEN BY THESE PRESENTS, that, we, MARTHA T. BRIDGES alkla MARTHA TATUM BRIDGES LOPEZ, ROBERT TODD BRIDGES, MARTHA TATUM BRIDGES LOPEZ as Guardian of Nlchoias Carl Bridges, a minor, DIANA W. TATUM, NANCY 0. TATUM, and ADDISON T. TATUM, JR., alkla A. T. Tatum, Jr., whose addreas I s clo Mr. John Burnam, Post Office Box 1828, Hattiesburg, Mlssisslppi 39403, hereinafter referred to as the GRANTORS, for and in consideration of the sum of THREE HUNDRED DOLLARS AND NO1100 ($300.09). the receipt and sufficiency of which are hereby acknowledged, do hereby GRANT. BARGAIN, SELL and CONVEY unto the UNITED STATES OF AMERICA

248

TITLE  

Office of Legacy Management (LM)

Hydrologic Processes and Hydrologic Processes and Radionuclide Distribution in a Cavity and Chimney Produced by the Cannikin Nuclear Explosion I Amchitka Island, Alaska By HANS C. C M S S E N H Y D R O L O G Y O F N U C L E A R T E S T S I T E S G E O L O G I C A L S U R V E Y P R O F E S S I O N A L P A P E R 7 1 2 - D Prepared on behay o J the US. Energy Research and Deuclopment Administration U N I T E D S T A T E S G O V E R N M E N T P R I N T I N G O F F I C E . W A S H I N G T O N : 1978 UNITED STATES DEPARTMENT OF THE INTERIOR CECIL D. ANDRUS. sectwary GEOLOGICAL SURVEY V. E. McKelvey. Direcror Library of Conlresr Cnrriolrtn# tn Puhltcrtban Udtr Ct*aaasn. Wnnr C. WydrOlo~nC procesbes and radionucl~dc distributnon in a cavity and chnmncv praduccd by rna Cannukin nuslssr ~ n n l u r r u n . h m c n n u r islrnd. AI;n*U*. (Hydrolory o f nuclssr tcat ritsal (Caoloyicsl Survey Profeuionai P

249

TITLE  

Office of Legacy Management (LM)

1 ~ 1 ~ ~ l l R R l l l l l l l i l ~ l ~ I R u 0 0 0 0 ~ f A Class 111 Cultural Resources Survey of the U. S. Department of Energy Rullson Gas Stimulation Test S f e Garfield County, Colorado December 1993 IT be?: tlX'i;j PBBRARII Environmental Restoration 1 A Class Ill Cultural Resources Survey of the U. S. Department of Energy Rulison Gas Stimulation Test Site Garfield County, Co torado December 1 993 Environmental Restoration A Class Ill Cultural Resources Survey of the U . S . Department of Energy Rulison Gas Stimulation Test Site Garfield County, Colorado Prepared for: W E Nevada Operations Office Las Vegas, Nevada 89193-8518 Prepared by: I T Corporation 4330 S. Valley View Blvd. Las Vegas, Nevada 89103 Work Performed under Contract No.: DE-AC08-92NV 10972 December 1993

250

Title  

U.S. Energy Information Administration (EIA) Indexed Site

Unlocking Energy Efficiency Unlocking Energy Efficiency in the U.S. Economy 2010 Energy Conference EIA, SAIS April 7, 2010 McKinsey & Company | 1 Carbon emissions Gigatons CO 2 e * End-use consumption Quadrillion BTUs * Includes carbon emission abatement potential from CHP Source: EIA AEO 2008, McKinsey analysis Significant energy efficiency potential exists in the U.S. economy Industrial Residential Commercial -9.1 Baseline 2020 Baseline case, 2008 30.8 36.9 39.9 NPV- positive case, 2020 3.2 NPV- positive case, 2020 Baseline 2020 4.3 Baseline case, 2008 3.9 -26% Savings -23% -18% -29% -28% McKinsey & Company | 2 Source: EIA AEO 2008, McKinsey analysis Primary energy End-use energy Electricity CHP Gas Oil Other Carbon emissions 100%= 9.1 quadrillion BTUs 1,080 TWh 2.9 TCF 250 MBOE Significant efficiency potential across fuel types Contribution by energy source to 2020 efficiency potential

251

Title  

Broader source: Energy.gov (indexed) [DOE]

Jamie Brown Jamie Brown Director, Earth & Mineral Sciences Division EPAct Complementary Program Update January 25, 2008 Office of Research and Development Introduction NETL's EPAct 999 Complementary R&D Program * Overview of the 4 research areas: - Drilling Under Extreme Conditions (DUEC) - improve the economic viability of drilling for and producing from domestic deep (>15, 000ft) and ultra-deep (>25,000ft)O&G resources. - Environmental Impacts of O&G (EI) - provide unbiased scientific information and analysis of the environmental impacts of O&G, and develop new technology to effectively deal with any negative environmental impacts - Enhanced and Unconventional Oil Recovery (EUOR) - develop advanced technologies that will move the status of known but recoverable oil resources to

252

Title  

Broader source: Energy.gov (indexed) [DOE]

Oil & Natural Gas R&D Oil & Natural Gas R&D National Energy Technology Laboratory Office of Fossil Energy 2008 Annual Plan (Draft) EPACT 2005, Subtitle J, Section999 John R. Duda, Deputy Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil 2008 Annual Plan (Draft) Development * RPSEA submitted Draft Annual Plan - November 14, 2007 - Modifications to 2007 plan * NETL developed the 2008 Annual Plan (Draft) - Federal Advisory Committees' recommendations - Program status and requirements - Complementary research plan * Submitted to HQ - December 11, 2007 - Incorporated comments from FE, et al * Sent to Federal Advisory Committees - January 9, 2008 Strategic Center for Natural Gas and Oil 2008 Annual Plan (Draft) General * "Ongoing activities"

253

Title  

Broader source: Energy.gov (indexed) [DOE]

DOE's Upcoming DOE's Upcoming 2012 Congestion Study Keith White California Public Utilities Commission December 15, 2011 2 General Comments ◊ California has been fully participating in west-wide "economic" transmission studies (TEPPC since 2006, recently with much-appreciated ARRA funding) ◊ The 2005 Energy Policy Act gives DOE unclear scope regarding "congestion," and a requirement to consult with states. The following are essential: * Clearly address the specific rationale for transmission: reliability, economic efficiency, resource priorities; * If considering potential future congestion* contingent on certain conditions, fully consider the likelihood of those conditions and the consistency with state energy policies and actual market developments.

254

TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CNT OW048 CNT OW048 Review of Environmentally Sensitive Resources at Off-Site Locations Nevada Test Site Nevada ~nvironmental Restoration Review of Environmentally Sensitive Resources at Off-Site Locations Prepared for: U.S. Deparuncnt of Energy Nevada Field Office Las Vcgas, Nevada R e p d by: l T Corporation Las Vcgas, Nevada Work Pcrformcd Under Conmct DE-AC08-92NV10972 March, 1993 Table of Contents 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1 Hazardous. Contaminated. or Polluted Sites . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2 Environmentally Sensitive Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.1 Property of Historic. Archaeological. or Archirectural Significance . . . . . . 1-3 1 2 . 2 Threatened. Endangered. or Candidate Species .

255

Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

James Bennett National Energy Technology Laboratory - USDOE E-Mail: james.bennett@netl.doe.gov Phone: 541-967-5983 Research Efforts at NETL to Improve Gasifier Performance GTC 2013, Colorado Springs, CO - Oct 13-16, 2013 CSC Fouling Refractory/TC Wear RSC Fouling Syngas Cleanup OUTLINE - Research Objectives - Program Overview - Materials Research Focus (Refractories) * Scope of work * Impact to date * Long range goals - Industrial Involvement - Summary/Disclaimer 3 Advanced Gasification Spalling Corrosion Goals: increase gasifier efficiency, reduce capital and operational costs, reduce cost of electricity, develop predictive gasifier models, meet/exceed EPA emission targets, and increase carbon feedstock flexibility (including U.S. low rank coals)

256

Title  

Broader source: Energy.gov (indexed) [DOE]

Contractors Contractors July 2010 Reporting Period 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

257

Title  

Broader source: Energy.gov (indexed) [DOE]

Unconventional Resources Unconventional Resources Technology Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 29, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Unconventional Resources Technology Advisory Committee Sub-Groups * Technology Transfer * Regulations * Water and Environmental Management * Production Research Themes

258

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

259

TITLE  

Office of Legacy Management (LM)

, ,-- , ,-- - < , - ' a 7. *: POST OFFICE BOX 2038 1; : . - - , . MANAGED BY M h M l N M A R I E l T A E N E l G Y S I S l E H S . INC. - .-- OAK RIDGE. TENNESSEE 37831 FOR THE U.S. DEPARTMEIIT OF EWEROI April 22, 1994 Dr. W. k Williams EM-421 Trwion n: Building Department of Energy Washington, D. C 20585-0002 Dear Dr. Williams: In a letter to you dated August 18, 1993, a summary of the initial radiological survey was provided with only limited inionnation regarding mncentratiom in soil samples and radiation measurements inside the house. Since then, all of the samples from the initial survey have been analyzed and additional samples have been collected and anal- The reauits have been provided lo y o u ' d D. G. Adler informally as they became available ' I h i r letter contains all the 'as-found"

260

TITLE  

Office of Legacy Management (LM)

Nationd Laboratory Nationd Laboratory 9700 South Cass Avenue, Argonne, IUinois 60439 DERIVATION OF GUIDELINES FOR UaANIUbi RESIDUAL &ADIOACTIVE MATERIAL M 801L AT THE FORMER - U T E AIRCRAFT TOOL AND m A C l ' U I U N C COMPANY SlTE, FAIRFIELD, OHIO E.R. Faillace, M . Nimmagadda, and C . Yu Environmental Assessment Division January 1995 work sponsonxl by U.S. Department of Energy OMice of Environmental Restoration Washington, D.C. CONTENTS NOTATION ......................................................... v ............................... 1 1NTRODU.CTION AND BRIEF HISTORY 3 ...................................... 1.1 Site Description and Setting 3 .................................................. 1.2 SiteHistory 4 1.3 Derivation of Cleanup Guidelines .................................. 6

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

TITLE  

Office of Legacy Management (LM)

FORCE CONTROL INDUSTRIES,'INC. 1 FORCE CONTROL INDUSTRIES,'INC. 1 2 3 0 7 2 CONTROL %60 Dixie Hwy.. Zip 45014 P.O. Box l a . Z p 45018 11W b l e . Sule F Failfield. Ohio T w M i g a n a8083 Phone: (513) 868-0900 Phone: !B10) 52441= FAX. (513) 868-2105 F . U i81C.l 52d-1208 C,ir Shear Clutch & Brake Systems November 10.1994 U. S. Deparbnent of Energy Oak Ridge Operations office Ann: AD-424, Katy Kates P.O. Box 2001 Oak Ridge, TN 37831 Dear Ms. Kates, In furtherance of the August 24,1994 letter from Doug Shook, his subsequent conversation with our legal counsel, Timothy A. Gamy, follow-up with Steve Priest, and your letter of November 4,1994, the modifications you have proposed to the real estate license are acceptabte to us. As you suggested, we have made the changes to the real estate license heretofore submitted to us, and we have enclosed three copies of

262

TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Individuals Individuals Step by Step Instructions - Page 1 of 4 Helpful Information STEP 1. Log in to the EH&S Job Hazards Analysis (JHA) system at https://ehswprod.lbl.gov/ehstraining/jha/login.aspx Use your LDAP username and Password to log in to the system. You may log in without an LDAP if you know that you have not been given one yet. Contact the Help Desk (486-4357) for assistance. Note: You will not be able to complete the process until you have a valid LDAP username and password STEP 2. To begin, select JHA New JHA from the Main Menu If you have already begun your JHA process, you can select to Modify or View from the JHA Main Menu item as well. Step by Step Instructions - Page 2 of 4 Helpful Information STEP 3. Begin the Questionnaire by selecting your work location

263

Title  

Broader source: Energy.gov (indexed) [DOE]

Recipients Recipients July 2010 Reporting Period 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

264

Title  

Broader source: Energy.gov (indexed) [DOE]

Contractors Contractors 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

265

Title  

Broader source: Energy.gov (indexed) [DOE]

Renewable Energy Renewable Energy eere.energy.gov 1 Clean Energy Developments in the U.S. China-U.S. Renewable Energy Forum Bobi Garrett National Renewable Energy Laboratory May 26, 2010 Office of Energy Efficiency and Renewable Energy eere.energy.gov 2 Today's Talk * U.S. Clean Energy in Context * The U.S. Recovery Act: Opportunity from Crisis * The U.S. Congress and Clean Energy: Getting to 60 * China-U.S. Collaboration on Clean Energy 2 Office of Energy Efficiency and Renewable Energy eere.energy.gov 3 Today's Talk 3 * U.S. Clean Energy in Context * The U.S. Recovery Act: Opportunity from Crisis * The U.S. Congress and Clean Energy: Getting to 60 * China-U.S. Collaboration on Clean Energy Office of Energy Efficiency and Renewable Energy eere.energy.gov 4 U.S. Energy Production and

266

Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

267

Title  

Broader source: Energy.gov (indexed) [DOE]

Recipients Recipients July, 2010 For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

268

Title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pantex Finance Benchmark Results Executive Briefing Pantex Finance Benchmark Results Executive Briefing © 2009 The Hackett Group, Inc. All rights reserved. Reproduction of this document or any portion thereof without prior written consent is prohibited. Table of Contents  Benchmark Background  Company Baseline  Executive Summary  Performance Driver Analysis  Recommendations & Next Steps  Appendix Page 3 NNSA - Pantex Finance Benchmark Results Executive Briefing © 2009 The Hackett Group, Inc. All rights reserved. Reproduction of this document or any portion thereof without prior written consent is prohibited. Benchmark Results Should be Evaluated in Conjunction With the Specific Requirements of Pantex's Industry What this benchmark is . . . What this benchmark is not . . .

269

TITLE  

Office of Legacy Management (LM)

p p a * T A olistii. ..ow ... Unlted States awernment 00))#~Tmsnt of Energy - - memorandum D*=APR 0 2 1987 muym NE-23 A m OR W C I : Revised Guidelines f o r Resldual R a d ~ o a c t i v e M a t e r i a l a t N S R A P and R e m t e SRIP S l t e s Ahrends, OR Kluk, OP-124 Nelson, WSSPd Schrelber , SSDPD Welty, EH-23 G I l b e r t , MIL Berven, ORHL Berger, ORAL! Young, Aerospace Attached I s a revjsed copy o f thc Department's Guidelines f o r n s l d u a l r a d l o a c t f v e material. This versfon o f the doculnent has been revised t o i n c l u d e comnents from EH and t o address the h o t spot and s u p p l m n t a l . I i m l t/except{ons procedures out1 i n e d during t h e July 1906 workshop and subsequent working group meetings. EH intends t o include these guidelines i n d r a f t DOE Order 5480.x~. R a d i a t i o n P r o t e c t i o n o f t h e Publlc and

270

TITLE  

Office of Legacy Management (LM)

Survey Results Survey Results for Neigh boring Properties of the Alba Craft Site Oxford, Ohio U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Index / / { i s / . . ....................................................... s. Main s t r a e t f i o w e s 3 . . (~1-008,012-014,016) : : , . W . Rose Avenue Properties ............................... .:. ........... I . . .97 (017) Linden Street Properties .................................................... 103 (010-011) Municipd Landfill h d parts of .......................................... 123 Tllpmnd. High School m p t s (018) Hr. J e f f Schroer Department of Energy Washmgton, DC 20585 S t ? i is93 Oxford Real Estate, Inc. 33 Yest Walnut S t m t Oxford, Ohto 4 5 M 6 Dear k. Schorr: W i t h theconsent of the m a r s , the U.S. Dapartrnt o

271

TITLE  

Office of Legacy Management (LM)

TO File rn w. 1 1311 300 TO File rn w. 1 1311 300 s ~ b p ~ t B&T Metals Site Scoping Trip Report mh November 22, 1995 hwr J.G. Braun 01 FUSRAP - Geotech ~ l t 4D12 f i t 241-5296 C ~ M S T O Distribution This trip report summarizes the information obtained by b t h the New York and MissourifOhio Teams during visits to the B&T Metals site. The scoping trips were - . - . performed to provide information to aid in the detailed ptanning, design, and preparation for site characterization and remedial action. The scoping trips included a site walkover, library - - - research to investigate historic Sanborn maps and newspaper articles, an interview with a retired 3&T Metals employee who was involved with the former MEDlAEC activities, coordinating with the property owner in preparation for characterization and remedial action,

272

TITLE  

Office of Legacy Management (LM)

Sensitive Species Survey Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 & \ Environmental Restoration Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado Prepared for: U.S. Department of Energy Environmentaf Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared by: IT CORPORATION 4330 S. Valley View BIvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No. DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n ... List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction .

273

TITLE  

Office of Legacy Management (LM)

OFF C OFF C . 1 Ili II11IlIIllllllllllllllI1111I~I B M - 171- 147 ~ ~ ~ 0 3 3 1 0 8 Biology and M e d i c i n e AMCHITKA BIOENVIRONMENTAL PROGRAM BIOENVIRONMENTAL S A F E T Y STUDIES, AMC HITKA ISLAND, ALASKA CANNIKIN D t 2 MONTHS REPORT Compiled by James B . K i r k w o o d and R. G l e n Fuller J u n e , 1972 P r e p a r e d for the U . S. A t o m i c E n e r g y C o m m i s s i o n under C o n t r a c t N o . AT(2b- 1 ) - 17 1 - - BATTELLE Columbus Labor a t o r ies 5 05 King Avenue C o l u m b u s , Ohio 4 3 2 0 1 P r i n t e d i n the United S t a t e s of America. A v a i l a b l e from N a t i o n a l Technical Information S e r v i c e U.S. Department of Commerce S p r i n g f i e l d , V i r g i n i a 22151 This r e p o r t was prepared a s a n account o f work sponsored by t h e United S t a t e s Government. Neither t h e United S t a t e s . - nor t h e United S t a t e s Atomic Energy Carrmission, nor any of

274

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

275

TITLE  

Office of Legacy Management (LM)

AMCHITKA BIOLOGICAL IWODlATION S AMCHITKA BIOLOGICAL IWODlATION S J M U I i Y Prspard for tho U. S. Atoric En~rny C d a a i o n undmr Contract No. A T (26-11-171 MTTkUE Colrubua LaboratoriRa 505 Kirq A V ~ R Collubua. Ohio 43201 Printed i n t h e U n i t d S t a t ~ of A l r r i w . A v a i h b l e f t o l - Nrtio-1 Technical I n f o r m t i o n Servic* U. S. D e p a r t u n t o f C o W t E P Sprinlf i a l d , v i + # i n b 22151 Thim r e p o r t naa p r e m r d a m an account of w x k mpon~ored by t h e United S t r t a a Goverrmmnt. Neithnr t h e Unltad S t a t e s nor the United Statem Atomic Energy Caminisaion, nor any of t h e i r employeem, nor any of t h e i r contractor#, subcontrac- t o r # , o r t h e i r eaployeea, makes any varranty, -press or implied, o r assumem any legal l i a b i l i t y o r r e s p o n s i b i l i t y f o r t h e accuracy. completsnnsn or usefulness of any infor- mation apparatus, product or precesa disclosed, or r

276

TITLE  

Office of Legacy Management (LM)

/ / m - 1 2 0 6 7 4 Department of Energy Oak Ridge *rations P.O. Box 2001 Oak Ridge, Tennessee 37831-8723 September 19, 1994 Hr. Saul Gleiser Ohio H i s t o r i c a l Society H i s t o r i c Preservation D i v i s i o n 1982 Yelma Avenue Columbus, Ohio 43211-2497 Dear Mr. Gleiser: ASSOCIATE AIRCRAFT SITE - NHPA (SECTION 106) DETERHINATION I n accordance w i t h Section 106 o f the National H i s t o r i c Preservation Act (NHPA), the Department o f Energy (WE) has determined t h a t the proposed removal o f r a d i o l o g i c a l contamination a t the former Associate A i r c r a f t s i t e located a t 3660 D i x i e Highway, F a i r f i e l d , Ohio, w i l l have no e f f e c t on properties included, o r e l i g i b l e f o r inclusion, on the National Register o f H i s t o r i c Places. A description o f proposed s i t e a c t i v i t i e s i s enclosed, along w

277

TITLE  

Office of Legacy Management (LM)

Certificafion Docket for the Certificafion Docket for the Remedial Action Performed af the Associate Aircraft Site, Fairfield, Ohio, 1994- 7 995 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office October 7 996 @ Prnleo m recynmrec)c*ahe paper CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE ASSOCIATE AIRCRAFT SITE, FAIRFIELO, OHIO, 1994-1995 OCTOBER 1996 Prepared for UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Oftice Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

278

TITLE  

Office of Legacy Management (LM)

10 G 10 G . Drexel/ M. Poligone F i l e no. 7315/124 s b j e c t Determination of Additional D o t e Contaminated Areas at AAS March 17, 1994 Copies to J. Allison G. Palau K. Thompson A. John At Oak Ridge Ext. 6-5173 The purpose of this memorandum is t o provide results from characterization activities at the Former Associated Aircraft Site (AAS) in Fairfield, Ohio. Additional areas of contamination requiring remediation were identified during these activities. Areas that are currently known to exhibit elevated readings, and were not in the original scope of work are shown in Figure 3. To summarize, the areas added are located in the following areas; North of Zone V in the bathroom area (north of the locker room) and the office (located north of the caged area)

279

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

280

TITLE  

Office of Legacy Management (LM)

1 111II1111111111111111111111111 1 111II1111111111111111111111111 GSB WW06 Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 y :

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

TITLE  

Office of Legacy Management (LM)

OEce of Radiation and OEce of Radiation and 12nvirorunentai Protection Indoor Ailr Washington., DC 20460 Annual Water Sampling and Analysis, Calendar Year 2000: R'ULISON Tes,t Site Area RLO BLANCO Test Site Area FAULTLESS Tes it Site Area SHOAL Test Site Area GASBUGGY Test Site, Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2000 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AI08-96NV11969 UDIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR U.S. ENVIRONMENTAL PROTECTION AGENCY P.O. BOX 98517 LAS VEGAS, NV 89193-8517 NOTICE

282

TITLE  

Office of Legacy Management (LM)

~overnment ~overnment Department of Energy Oak Ridge Operations Office memorandum DATE: January 19. 1995 SUBIECT: USE OF EXEHPTIOW FROW DEPhRTnEKl OF ENERGY ORDER 5820.2A F O R RADIOhCTIVE WASTE FROn FUSlUl To: James A. Turi , Director, O f f i c e o f Program Support, O f f i c e o f the Deputy Assistant Secretary Waste Clanagelent, M-33, TREY I I This m r a n d u n serves t o n o t i f y 01-33 o f the F o m r l y U t i l i z e d Sites Remedial Action Program's (FUSRAP] i n t e n t t s dispose o f radioactive waste a t a cormercial disposal f a c i l i t y . I n compl iance w i t h the authorization (1. P. G r d l y t o Managers WE Operations Offices dated 10/12/93), the following information i s being provided p r i o r t o comnencement o f the Associate A i r c r a f t , F a i r f i e l d , Ohio, waste stream 2027-01. Waste type: S o i l , vacuum b

283

TITLE  

Office of Legacy Management (LM)

, . . - . . t e d Copj UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Faderal Center, Llcewood, Colorado 80225 BATHYMETRY OF CANNIKIN LAKE, AnCRITU ISLAND. ALASKA, WITH AN EVALUATION OF COMPUTER MAPPING TECHNIQUES Don Digeo GonerLee, Leonard E. Wollltz, and G. E . Brerhauer CONTENTS Page A b s t r a c t . . . . . . . . . . . . . . . . . .. . . . . . . , . . . . . 1 I n t r o d u c t i o n . . . . . . . . . . . . . , . . . . . . . . . . . . . . 1 Acknowl.edgments . . . . . . . . . . . . . . . . . . . . . . . 5 Geologic and hydrologic s e t t i n g . . . . . . . . . - . . . . . . . . 5 Effects of Cannikin . . . . . . . . . . . . . . . . . . . . . . . 6. Bathymetry . . . . . . . . . . . . . . . . . . . . . . 8 Computerlnepping techniques . . . . . . . . . . . + . . . . . , . . 9 Comparison o f computer-mapping techniques . . . . . . . . . . . . .

284

TITLE  

Office of Legacy Management (LM)

Ill lllIlllllllllllllllllllllllIII1 Ill lllIlllllllllllllllllllllllIII1 SHL 000035 Letter Report Contaminant Boundary at the Shoal Underground Nuclear Test prepared by Greg Pohll and Karl Pohlmann Division of Hydrologic Sciences Desert Research Institute University and Community College System of Nevada submitted to Nevada Sitc O f i c e National Nuclear Security Administration U.S. Deparuncnt of Enagy Las Vegas, Nevada August 6,2004 The work upon which this report is based was suppomd by the U.S. Department of Energy under Contract #DE-AC52-OONVI3609; intended for limited distribution. Reference herein to any specific commercial product, process, or service by trade name, trademark, n~anuC;lcturcr, or otherwise, does not necussuily constitute or imply its endorsement, recommendation, 01. favoring by the Unitcd States Govcmmcnl or any agcncy thereof ur its

285

TITLE  

Office of Legacy Management (LM)

~ ~ ~erivation of ~uidelines for Uranium Residual Radioactive Material in soil at the B&T Metals Company Site, Columbus,. Ohio Environmental Assessment Division f i Argonne National Laborgory Operated by The Unlvenlty of ChCago. under Contract w-31-109-Eng-38, lor tne United States Department of Energy Derivation of Guidelines for Uranium Residual Radioactive Material in Soil at the B&T Metals Company Site, Columbus, Ohio by S. Kamboj. M. Nimmagadda, and C. Yu Env~ronmental Assessment Division. Argonne National Laboratory, 9700 South Cass Avenue. Argonne. Illinois 60439 January 1996 Work sponsored by U.S. Depanment of Energy. Office of Environmental Restoration, Washington, D.C. ; CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

286

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

287

TITLE  

Office of Legacy Management (LM)

68 68 OFF C . 2 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 . I \ . j Environmental Restoration Sensitive Species Su wey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1 993 Environmental Restoration 1 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico Prepared for: U.S. Deparunenr of Energy Environmental Restoration Division DOE Nevada Operations Officc Las Vegas, Nevada 89193-851 8 Prepared by: I T CORPORATION 4330 S. Valley View Blvd.. Suite 114 Las Vegas, Nevada 89 103 Work Pcrformcd undcr Contract No. DE-AC08-92NV10972 Table of Contents List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii ... List of Tables . . . . . . . . . . .

288

TITLE  

Office of Legacy Management (LM)

902 902 GEN-BKS - - - . I 111 111 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l l Ill SHL 000024 United States Office of Radiation and EPA-402-R-94-001 Environmental Protection Indoor Air January 2004 Agency Washington, DC 20460 Annual Water Sampling and Analysis, Calendar Year 2003: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RI0 BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2003 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Max G. Davis Terry L. Mouck Prepared for the U. S. Department of Energy under Interagency Agreement DE-,4108-96NV11969 RADIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY

289

TITLE  

Office of Legacy Management (LM)

POST-REMEDIAL ACTION REPORT POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAJT SITE Fairfield, Ohio Bechtel National, Inc. POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAFT SITE FAIRFIELD. OHIO JULY 1996 Prepared for United States Depariment o f Energy Oak Ridge Operations Off= Under Contract No. DE-AC05-910R2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1 . 1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . 3 2.0 REMEDIAL ACTION GUIDELINES .

290

TITLE  

Office of Legacy Management (LM)

Bechtel Bechtel Inferoffice Memorandum TO G. L. Palau Subject Scoping Notice:' Former Associate Aircraft Tool and Manufacturing., Inc . Site, Fairf ield, Ohio copies to T. E. Morris G. R. Gale W & J. S. Allison File No. 7440/124 Date November 1, 1994 Frcm D. D. Sexton MS of ES &H ~t Oak Ridge ~ x t . 4-3643 SCOPING NOTICE INTRODUCTION The purpose of this scoping notice is to formalize the identification and application of federal and state rules and regulations that may apply to the cleanup of the Former Associate Aircraft Tool and Manufacturing Site at 3660 Dixie Highway (hereinafter referred to as the Fairfield Site), in Fairfield, Ohio. This environmental compliance evaluation is based on information contained in the Radiological Survey of the site which provides the nature and extent

291

TITLE  

Office of Legacy Management (LM)

T T O G. L. Palau Subject Scoping Notice: The B&T Metals Site, Columbus, Ohio F i l s No. 744011 13 ~ a t t February 26, 1996 F P m l D. D. Sexton b of Environmental Compliance EX^. Oak Ridge ~t 4-3643 BACKGROUND The purpose of this Scoping Notice is to formalize the identification and evaluate the application of federal and state rulcs and regulations that apply to the cleanup of the B&T Metals site, located in Columbus, Ohio. This environmental compliance evaluation is based on information contained in the Designation Summary of the site (CCN 095792), which provides the nature and extent of radiological contamination, and upon an Engineering and Technology preliminary draft characterization report which identifies the presence and type of chemical and radioactive mixed waste present at the site.

292

TITLE  

Office of Legacy Management (LM)

Floodplains and Wetlands Floodplains and Wetlands Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 Environmental Restoration Floodplains and Wetlands Survey Results tor the Rulison and Rio Blanco Sites, Colorado Prepared For: U.S. Department of Energy Environmental Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared By: l T CORPORATION 4330 S. Valley View Blvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No: DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

293

Title  

Gasoline and Diesel Fuel Update (EIA)

External Developments Division External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem Energy Information Administration 24 August 2011 by Marco J. Lombardi and Ine van Robays European Central Bank and Ghent Univeristy 2 Motivation * Oil price surged with increasing momentum between 2003-2008 before falling in the wake of the financial crisis and the subsequent economic downturn. After that, prices recovered again. * Oil price increases came against the background of surging demand and stagnating supply. 0 20 40 60 80 100 120 140 2000M01 2001M01 2002M01 2003M01 2004M01 2005M01 2006M01 2007M01 2008M01 2009M01 2010M01 spot oil price in USD/barrel 3 Financialization of oil * The financialization

294

title  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

295

TITLE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Watec Resources Canter Watec Resources Canter 1 I EVALUATION OF GROUNDWATER FLOW AND TRANSPORT AT THE FAULTLESS UNDERGROUND NUCLEAR TEST, CENTRAL NEVADA TEST AREA I prepared by I Karl P o h l m a ~ , Jenny Chapman, Ahmed Hassan, and Charalambos Papelis ! submitted to Nevada Operations M c e U.S. Department of Energy SEPTEMBER 1999 Publication No. 45165 @ C F J C This report uas prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any o f their contractors, subaontractors or their employees, makes any warranty, express M implied, or assumes any It@ Liability or responsibility for the accuracy, oompletenesr, or any third party's use or the results of such use of m

296

Title  

Broader source: Energy.gov (indexed) [DOE]

Recipients Recipients 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

297

Title  

Broader source: Energy.gov (indexed) [DOE]

Value Propositions for Four Value Propositions for Four Modular Electricity Storage Demonstrations in California EESAT 2007 San Francisco by Distributed Utility Associates, Inc. Jim Eyer, Senior Analyst jim@dua1.com Susan Horgan, President susan@dua1.com Funded by the Energy Storage Systems Program of the U.S. Department Of Energy (DOE/ESS) through Sandia National Laboratories (SNL). EESAT 2007 - Eyer - DUA 2 Agenda * Scope * Background * Assessing Value Propositions * Supercapacitor for Sacramento Light Rail * Supercapacitor for Load & DG Integration * Flow Battery for T&D Deferral * Flywheel for Area Regulation * Outlook EESAT 2007 - Eyer - DUA 3 Scope * DOE ESS partnership with CEC/PIER - innovative electricity storage demonstrations in California that are sponsored by CEC/PIER * DUA: Evaluation and Report

298

Title  

Broader source: Energy.gov (indexed) [DOE]

Brad Tomer Brad Tomer Director, Strategic Center for Natural Gas & Oil EPACT Section 999 Federal Advisory Committee Meetings January 28-29, 2008 Strategic Center for Natural Gas and Oil Strategic Center for Natural Gas & Oil * Create public benefits by investing in research that industry would not take on itself * Deliver a balanced portfolio of technology to: - Enable Independents to efficiently produce discovered resources - Conduct long-term/high risk R&D - develop entirely new sources of supply - Minimize environmental impact Implement science and technology programs that resolve the environmental, supply and reliability constraints of oil and natural gas resources and enhance our energy security A multi-discipline, long-term, high-risk, and high-reward endeavor that

299

Title  

Broader source: Energy.gov (indexed) [DOE]

Ultra-Deepwater Advisory Ultra-Deepwater Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Ultra-Deepwater Advisory Committee Sub-Groups * R&D Theme Content * Solicitation Process * Environmental * Access Strategic Center for Natural Gas and Oil UDAC Recommendations for 2007 Plan

300

TITLE:  

Broader source: Energy.gov (indexed) [DOE]

ClTY/CO{TRIBAL): ClTY/CO{TRIBAL): DAT E RE CEIVED: CA-TR iBE-TABLE MOUNTAIN RANCHERIA OF CALIFORN IA 61 735 1 937 Tribe Oak Ridge Office COMPLETE STATE: CA Round Two Review: t I BRIEF DESCRIPTION: Develop energy efficiency and con servation strategy and fea si bility study ofthe Rancheria energy usage NEPA REVI EW ER NEPA DECISION (CX/EA/EIS): NHPA ISSU ES NEPAjNHPA CONDITIONS: S.G. Thornton ex CX APPLIED: CX-EECBG -001 LI SUBPART D REF Approval for strategy/feasibility st udy only Ny( Compliance Officer (NCO) Review, including consideration of extraordiOilfy circumstiinceS: ~ction may be categorically ucluded from further NEPA review. I hilve dete rmined that the proposed action meets the requirements for Cltegorical exclusion in Subpart D, Appendix A or B. C Action requires approvill by Head oft

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

TITLE  

Office of Legacy Management (LM)

CHAPTER lV CHAPTER lV 1. PURPOSE. This chapter presents radiological protection requirements and guidelines for cleanup of residual radioactive material and management of the resulting wastes and residues and release of property. These requirements and guidelines are applicable at the time the property is released. Property subject to these criteria indudes, but is not limited to sacs identied by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). The topics covered are basic dose limits, guidelines and authorized limits for allowable levels of residual radioadive material, and control of the radioactive wastes and residues. This chapter does not apply to uranium mill tailings or to properties covered by mandatory legal requirements.

302

TITLE  

Office of Legacy Management (LM)

e ~ a r t m e n t of Energy Oak Ridge Operations P.O. Box 2001 Oak Ridge. Tennessee 37831- November 7, 1995 Dave To1 b e r t B&T Metals Company & B&T F l o o r Company P. 0 . Box 163520 Columbus, Ohio 43216-3520 Dear M r . To1 b e r t : REAL ESTATE LICENSE REORDOER-7-96-0103, B&T METALS COHPANY, COLUMBUS, OH Enclosed f o r your records i s a copy o f the f u l l y executed 1 icense between B&T Metals Company and the Department o f Energy. Is t h e separate l i c e n s e f o r B&T F l o o r Company a l s o being transmitted t o t h i s o f f i c e ? Thank you f o r your cooperation and assistance i n t h i s action. I f you have any questions concerning t h e r e a l e s t a t e instrument, please f e e l f r e e t o contact m e a t 423- 576-0977. Sincerely, Katy Kates Realty O f f i c e r Enclosure As stated

303

TITLE  

Office of Legacy Management (LM)

Date: 11/21/35 10:12:16 AM Date: 11/21/35 10:12:16 AM 136930 From: HARTMANGSOoro.doe.gov Subject: Re: CX Determination - B&T Metals Removal Action (FUSRAP-036 HOW about this! This is the first CX determination that we have done electronically - - - same-day turnaround!!! Gary Forwarding routing: Les Price, PSRD Bill Seay, FSRD Dave Adler, PSRD Loren Marz, PSRD Gerry Palau. BNI Dave Sexton, BNI Teresa Noe, BNI (PDCC) Forward Header :~Liject: Re: CX Determination - B&T Metals Removal Action (PUSPAP-036 i~thor: PHILLIPSPW at SE31 8 s 1-5 : 11/21/95 12:OO PM Based on the recommendation of Gary Hartman, Environmental Scientist, EW93, I determine that the subject proposed action is categorically excluded from further NEPA review and documentation. Patricia W. Phillips

304

TITLE  

Office of Legacy Management (LM)

. . · MONTICELLO NPL SITES FFA QUARTERLY REPORT: January 1- March 31, 2007 DOE Site Manager: Jalena Maestas 1.0 MMTS Activities/Status Repository and Pond 4 * Monthly and quarterly inspection of the repository identified no problems other than shrub damage by voles (inspection checklists attached). * Monthly inspection of Pond 4 identified no unacceptable conditions. * Pond 4 leachate detection and removal systems operated at normal levels (leachate pumping summary attached). * Repository leachate collection and removal system (LCRS) and leachate collection system (LDS) operated at normal levels (leachate pumping summary attached). * Equipment purchased to upgrade repository LCRS and LDS remote sensing and telemetry system. * Portions of repository cover were manually re-seeded with desirable shrubs to repair areas

305

TITLE  

Office of Legacy Management (LM)

M M A U h G E D 0 1 M M l N Y A R I E I ENERGY SYSTEMS. IYC. FOR THE U.S. O E P A R I M E I I T OF ENEnOY June 14, 1994 POST OFFICE BOX 2006 OAK RIDGE. TENNESSEE 37831 Dr. W. A. Williams EM-421 Trevion II Building Department of Energy Washington, D. C. 20585 Dear Dr. Williams: T r i p Report: Radiological Survey of Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio (FOHOOl), M a y 31 and June 1,1994 On May 31 and June I, a radiological survey was conducted in the area surveyed during the March 7, 1994 survey in the referenced facility. This letter provides the results of that survey. Survey methods consisted of a beta-gamma survey of the surface of the concrete as the floor covering material was being removed by a construction contractor to begin renovation of the former

306

TITLE  

Office of Legacy Management (LM)

RIDOH RIDOH NArnONAL LABORATORY c- Results of the Independent Radiological Verification Survey I.* K . . . . 1 A . T I r n * at the Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio - (FOH001) D . E . Rice M . E . Murray K. S . Brown EEALTH SCIENCES RESEARCH DMSION E ' * I ~ m d w a s k M ~ t ~ ~ ~ ( ~ N o . E X Z D 2 0 0 1 O; AB131DM) Aircraft ~ o o l and Manrlaet~ring Company Site, Fiirfleld, Oh10 (FOH001) D. E. Rice, M. E. Mumy, K:S. Brown . . . . lmza@am Tam R D. FdeJr-E-tAppholboPl4DCrdDPllLlltW D. E . Rice - Suvsy Tam iada 1 3 9 3 1 9 CONTENTS .................................................. LISTOFFI- v .................................................. LISTOFTABLES 6 A C K N O - S ............................................. u ABSTRACT ....................................................... xi

307

TITLE  

Office of Legacy Management (LM)

Formerly Utilized Sites Remedial Action Program (FUSRAP) Formerly Utilized Sites Remedial Action Program (FUSRAP) - Contract No. DE-ACOS-9 1 OR21 949 Post-Remedial Action Report for the 8. & T Metals Site Columbus, Ohio October 1996 POST-REMEDIAL ACTION REPORT f OR THE . . B&T METALS SITE COLUMBUS. OHIO OCTOBER 1 W6 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACOS-91 OR2 1949 I Bechtel National, Inc. Oak Ridge, Tcnncssoe I Bcchtel lob No. 14501 CONTENTS Page FIGURES ............................................................................................................................................... iv TABLES ................................................................................................................................................ iv

308

TITLE  

Office of Legacy Management (LM)

Verification Verification Survey at B&T Metals, 425 West Town Street, Columbus, Ohio M. E. Murray V. P. Patania C. A. Johnson This report h s ken rcpmduccd directly from the t f s i avail3ble copy. Avaihble to DOE and DOE c o n m u x s from the Olficc of Scienlific and Technical inlormaliar. P.O. Boa 6 1 . W Ridsee. l X 378331: priccsav&lable from (6t5) 576-8101, TTS 6268401. A v ~ i t b I e t o h e public lmm the Naliorul Technical Inlormalion Service. U.S. Dcpvtmenl 01 Commcrcc. 5285 Pon Royal Rd.. Springlield. VA 22161. This rcpon was prep& as an account o f work sponsored by an agency o f thc Unircd Sutcs Govcmmcnr. X c i h c ~ thc Uniicd Sulcs Govcrnmcn~ nor any ;Igcncy, Lhcrcol. nor any of theu crnployccs, mikes my warmly. cxprcss, or implicd.or assumcs my legal l i i i l

309

TITLE  

Office of Legacy Management (LM)

Peccrdei et .... g:~.g-..o*c *ck .*,- Peccrdei et .... g:~.g-..o*c *ck .*,- &.-. fi+ E C 7 ---.----.- .-.... 3$rS --------- ixx4!30 F A ~ 953 ' 27565' glla 5tcpEe.l. Peeorder Reception N o . - STATE OF COtOPA00 COUFlTY OF GARFIELD MfEREAS, under date of kcember 7 , 1966, an oil and gas l e a s e was entered i n t o between Claude V. Hayward, lessor, snd Rustrat dl1 Ccmpany Incorporated, Lessee, covering, among other l a n d s , t a t 1 1 , being the Northeast Quarter ~b the Southwest Q u a r t e r o f Section 25, f - 7 4 , R-95-W, Garfield County, Calnrnda, sa3d lease being recorded O n 86ak 381, Fag? 418, o f the ~rritdrd$ of B a r f leld County, C s l o r e d ~ ; and @ WWEEA., under date o f l%y 5 , 1967, a U n l t Agrarmnt fas the Dcvelapmnt and Opcratlon o f the Rulison Vn4 t Area I n Gsrfield and He58 Counties Colorado, was entered 1 nto betwen Aus t r

310

Title  

Broader source: Energy.gov (indexed) [DOE]

Recipients Recipients For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

311

Title:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

closer to the sun. Its location at the center of the Earth is what makes its average temperature warmer than any other place on Earth, because the equator always receives direct...

312

Title  

National Nuclear Security Administration (NNSA)

early Permian in age and consist of 22,000 feet of limestone, dolomite, quartz- ite, shale, and conglomerate beds. The predominantly volcanic Oak Springs formation of Tertiary...

313

TITLE  

Office of Scientific and Technical Information (OSTI)

the CUDA toolkit has placed the NVIDIA GPUs abreast to the contemporary High Performance Computing (HPC) technologies. Among the NVIDIA CUDA enabled GPUS, the Tesla series is...

314

TITLE  

Office of Legacy Management (LM)

TAKE- s - United States Department of' h e Interior - - FISH AND WII.,DLIFE SEKWC:E am I I 4600 Kiotrk. Lam, Building C-125 -no, e v a d a 89502-5093 SHL 000036 January 13,...

315

Title  

National Nuclear Security Administration (NNSA)

V. Lida V. Stonewall Flat Sarcobatus Flat Gold Flat Cactus Flat Stone Cabin V. Little Fish Lake V. Antelope V. (Eureka & Nye) Stevens Basin Diamond V. Newark V. Little Smoky V....

316

TITLE  

Office of Legacy Management (LM)

RESBARCH CKNTER ALBANY, OREGON MARCH 1992 Prepared for United States Department of Energy Oak Ridge Field Office Under Contract No. DE-AC05-910R2 19 49 Bechtel National, Inc. Oak...

317

TITLE  

Office of Legacy Management (LM)

ALBANY RESEARCH C E W R ALBANY, OREGON Prepared for United States Department of Energy Oak Ridge Field Office Under Contract No. DE-AC05-9 1OR2 19 4 9 Bechtel National, Inc. Oak...

318

TITLE  

Office of Legacy Management (LM)

RESEARCH CENTER ALBANY, OREGQN APRIL 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 H . E. Kaye, J. H ....

319

Title  

National Nuclear Security Administration (NNSA)

RECORD i 002031 MISSISSIPPIAN PALEOGEOGRAPH* AND CONODONT BIOSTRATIGRAPH* OF THE WESTERN UNITED STATES Forrest: G. Poolc U.S. Geological Survey Box 25046, MS 90S Federal...

320

Title  

National Nuclear Security Administration (NNSA)

TEST CELL "C" LEACH FIELD TEST CELL "C" LARGE STORAGE TANK TEST CELL "C" SMALL STORAGE TANKS TEST CELL "C" NUCLEAR FURNACH PIPING AREA 25 (400) '*ROCKET -DEVELOP** STATION...

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Title  

National Nuclear Security Administration (NNSA)

so (little hill). They were: 55. Wuniakuda, a place 2 or 3 miles east of the Ammonia Tanks (Tuna'kuwa, low hill) at about 6,000 feet, where TSt's mother's sister's family...

322

Title  

National Nuclear Security Administration (NNSA)

Hinrichs, E.N., R.D. Krushensky and S.J. Luft, 1967. Geologic Map of the Ammonia Tanks Quadrangle, Nye County, Nevada. U.S. Geological Survey, Geologic Quadrangle Map...

323

Title  

National Nuclear Security Administration (NNSA)

center predominate at this site, as well. The predominant rocks include the Ammonia Tanks and Topopah Spring tuffs and ash-flow tuffs. There are also exposures of clastic...

324

Title  

National Nuclear Security Administration (NNSA)

galleries, tunnels, short lengths of pipe leading from the spring, or storage tanks may still be found at some of them. Table 4. Records of springs in the Nevada Test...

325

TITLE  

Office of Legacy Management (LM)

to radionuclides, and they come fiom a wide variety of sources ranging from leaking tanks to underground nuclear tests. All of these problems have in common the need to...

326

Title  

National Nuclear Security Administration (NNSA)

45 Yucca Wash Sites 46 Site 8-Yucca Wash Quarry (26Ny1011), 47 Site 9-Sever Tanks (26Ny 1964) 49 Site 10-Yellow Rockshelters 51 Site 11 - Boulder Rockshetters 52...

327

TITLE  

Office of Legacy Management (LM)

were analyzed for radioactive content. Sediment samples from suspect severe, septic tanks, and drain lines were also analyzed. All soil, water, and sediment samples were...

328

Title:  

Office of Scientific and Technical Information (OSTI)

8-1 1, 1997, Innsbruck, Austrai 1663, Los Alamos, NM 87545, USA Gaithersburg, MD, USA Germany 1663, Los Alamos, NM 87545, USA 1663, Los Alamos, NM 87545, USA DISCLAIMER This...

329

TITLE  

Office of Legacy Management (LM)

Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix....

330

TITLE  

Office of Legacy Management (LM)

Plates are not available in electronic format. Please e-mail lm.records@lm.doe.gov to request the appendix...

331

TITLE  

Office of Legacy Management (LM)

a nesaage dated June 12, 1978, from Hugh D . Guthrie, Acting Director, Division of Oil, Gas and Shale Technology, to 8. W. Taft, Assistant Kanager for Plans, Engineering and...

332

TITLE  

Office of Legacy Management (LM)

e r n m o s t 29 a c r e s of t h e p r o p e r t y : a 2 - a c r e , i n a c t i v e BioMass R e s e a r c h F a c i l i t y , l o c a t e d n e a r t h e c e n t e r of t h e p...

333

((Title))  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

make them ideal for applications in the storage of energies generated by intermittent energy sources such as windmills and solar cells. The electric double-layer capacitor (EDLC)...

334

TITLE  

Office of Legacy Management (LM)

conference. The final Sampling and Quality Assurance Plans shall be approved by the Contracting Officer prior to commencement of field work. 7 . 0 FIELDWORK The Contractor shall...

335

TITLE  

Office of Legacy Management (LM)

b i l l e t s . A record review i d e n t i f i e s s i g n i f i c a n t MED control o f operations and conduct o f environmental r e s t o r a t i o n . Therefore, WE has the a u...

336

Title  

National Nuclear Security Administration (NNSA)

Geologic map of the Nevada Test Site, Southern Nevada. Geographic Features of NTS and upland Areas. Author Frizzell, Jr. V.A. and J. Shulters 101056 Document Date 1190 Document...

337

TITLE  

Office of Legacy Management (LM)

Ill Cultural Resources Survey of the U. S. Department of Energy Gasbuggy Stimulation Test Site Rio Arriba County, New Mexico December 1 993 Environmental Restoration I 1 A Class...

338

Title  

National Nuclear Security Administration (NNSA)

Ecological studies of vertebrates in plutonium-contaminated areas of the Nevada Test Site (NTS) were initiated in March, 1972, and have continued to date. In September,...

339

Title  

National Nuclear Security Administration (NNSA)

Noteworthy Mammal Distribution Records for the Nevada Test Site (RE: "Great Basin Naturalist" 50(1)) This report adds three new mammal species to the original 46 species that occur...

340

Title  

National Nuclear Security Administration (NNSA)

FLOOD POTENTIAL OF TOPOPAH WASH AND TRIBUTARIES, EASTERN PART OF JACKASS FLATS, NEVADA TEST SITE, SOUTHERN NEVADA By Rulon C. Christensen and Norman E. Spahr U.S. GEOLOGICAL...

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Title  

National Nuclear Security Administration (NNSA)

Baseline vegetation contamination at safety test sites on the NTS and Tonopah Test Range. Describes concentrations of transuranics onin native vegetation sampled on NTS and TTR in...

342

TITLE  

Office of Legacy Management (LM)

Washington, DC 20460 Annual Water Sampling and Analysis, Calendar Year 2001: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area...

343

Title  

National Nuclear Security Administration (NNSA)

RECORD ADMIN RECORDS O HYDROGEOLOGIC CONTROLS ON THE MOVEMENT OF GRO AT THE NEVADA TEST SITE, NYE COUNTY, NEVADA-- A SUMMARY DESCRIPTION FOR ENVIRONMENTAL RESTORATION Douglas...

344

((Title))  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

120 to 800 nm have been synthesized through direct self- polymerization and subsequent carbonization by Lu and co- workers. 6a Although the resultant carbon spheres have high...

345

Title:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3-5 Planting Trees http:education.arm.gov Planting Trees: Grades 3-5 2 Planting Trees Approximate Time 1 to 3 hours, depending upon amount of teacher modeling and depth required...

346

Title:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6-8 Making Clouds http:education.arm.gov Making Clouds: Grades 6-8 1 Making Clouds Approximate Time 1 hour Objective The objective of this activity is to investigate the...

347

Title:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Education and Outreach Lesson Plan Visit our online activities collection http:education.arm.gov Grade levels 9-12 Monsoon Convection Cells http:education.arm.gov Monsoon...

348

Title:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is a common misunderstanding that the melting of the polar sea ice will cause the ocean level to rise. Background Information What is global warming? Our Earth's average...

349

TITLE  

Office of Legacy Management (LM)

within 1 m of the contaminated aaterfals during the entire 40 h. Using applicable conversion factors, gamma and beta-gamma survey measurements were used to calculate the...

350

TITLE  

Office of Legacy Management (LM)

. . . . . . . . 13 FIGURE 5: Building 3, Room 102, Hydraulic Press X35443 Indicating Measurement Locations . . . . . . . . . . . . . . . . . . . . . . . 14 FIGURE 6: Building 4...

351

TITLE  

Office of Legacy Management (LM)

i s t o document the selected approach t o s a t i s f y i n g environmental docmentat ion and comnuni ty re1 a t i o n s n q u l rements f o r t h e Albany Research Center...

352

TITLE  

Office of Legacy Management (LM)

Plan for the Monticello NPL Sites Doc. No. S0038700 Page 3-14 U.S. Department of Energy Rev.O Rt>v n M

353

Title  

National Nuclear Security Administration (NNSA)

which are often given a negative connotation by many environmentalists but without alternative solutions to the problems. Radiation ecology attempts to address the many...

354

Title  

National Nuclear Security Administration (NNSA)

THE NEVADA TEST SITE During tlic course of ecological studies con- ducted tit the Atomic Energy Commission test site since 1939 in the vicinity of Mercury, Ne- vada, collections...

355

Title  

National Nuclear Security Administration (NNSA)

. 32. Global Environmental Monitoring System 1 * P.O. Box 30552 Nairobi, Kenya * 33. Ron Green 1 EG&GEnergy Measurements * P.O. Box 1912, MS V-01 I Las Vegas, NV 89125 " 34....

356

Title  

National Nuclear Security Administration (NNSA)

DECEMBER 1994 . This work was performed by EG&GEM for the United States Departments of Energy under Contract No. DE-AC08-93NV11265. ABSTRACT ' * ' ' ' ' ' ' This report presents...

357

Title  

National Nuclear Security Administration (NNSA)

PREPARED FROM 1:24.000' SCALE AERIAL PHOTOGRAPHS TAKEN AUGUST, 1991 BY E G 8 G ENERGY MEASUREMENTS, INC. TION ALLUVIAL FAN BOUNDARY BOUNDARY OF RADIOACTIVE WASTE'...

358

Title  

National Nuclear Security Administration (NNSA)

EG&G Idaho, Inc., P.O. Box 1625, Idaho Falls, ID 83415 and , T. P. O'Farrell EG&G Energy Measurements, Inc., 130 Robin Hill Road, Goleta, CA 93117 (Received 12 May 1987;...

359

Title  

National Nuclear Security Administration (NNSA)

Valley 104 Eagle Valley 105 Carson Valley WALKER SYSTEM (17) 106 Antelope Valley 107 Smith Valley 108 Mason Valley 109 East Walker Area 110 Walker Lake Valley A. Schurz Subarea...

360

TITLE  

Office of Legacy Management (LM)

Illinois 60439 Prepared bp R. A. Uynveen Associate Division Director, OHS W. H. Smith Senior Health Physicist C. . Sholeen Health Physicist A. L. Just- liealth Physicist K....

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Title  

National Nuclear Security Administration (NNSA)

does it reflect the efforts of James L. Reveal, University of Maryland and the Smith- sonian Institution, whose contributions began with the first intensive plant...

362

Title  

National Nuclear Security Administration (NNSA)

Amer i ca, V o l . 61, No. 5, pp. 1413-1432 (NNA.890714.0075). Hamilton, R. M., B. E. Smith, F. G. Fischer, and P. J. Papanek, 1971. Seismicity of the Pahute Mesa Area; Nevada...

363

Title  

National Nuclear Security Administration (NNSA)

of Energy. W a ' . L , : L - C ' , . ; k ' v k Giles to the public (Smith, et al., 1980). The west portion of the NTS was withdrawn from public use in October...

364

Title  

National Nuclear Security Administration (NNSA)

The terminology for the pyroclastic rocks described in this report is that of Ross and Smith (1961) and Poole, Elston, and Carr (1965). I Several general characteristics of the...

365

Title  

National Nuclear Security Administration (NNSA)

by Terrestrial Plants." USEPA Technical Note. ORPI.V 76-2. Brctthaucr, E. W. , P. B. Smith, A. .). Cummings, C. B. Morgan, and* S. C. Black 1974. "Preliminary Report of the...

366

Title  

National Nuclear Security Administration (NNSA)

recommending three candidate sites for further consideration: Hanford, Washington; Deaf Smith, Texas; and Yucca Mountain, Nevada. When the present study was initiated (July 7,...

367

TITLE  

Office of Legacy Management (LM)

b v e low pcrmeabllities aad therefore do not readily transmit water to w e b Ph.1 md Smith 1983). T h e Albany area ia drained primarily by the Wbmette md Cnhpooin rivers (Fig....

368

TITLE  

Office of Legacy Management (LM)

Main S u i t e 2 4 0 P o r t l a n d , OR 92704 ( 5 0 3 ) 326-3370 The Honorable Denny smith House of R e p r e s e n t a t i v e s 1213 Longworth House O f f i c e B u i l d i n...

369

Title  

National Nuclear Security Administration (NNSA)

into contact with environmental plutonium directly from the soil and not through a food-web intermediary. 404 TRANSURANIC, ELEMENTS IN THE ENVIRONMENT Several reviews on...

370

Title  

National Nuclear Security Administration (NNSA)

volume and concentration) any new radionuclides from Cambric might be detected at RNM-2S. Careshould be taken to see that the sensitivity of planned measurements of isotope...

371

TITLE  

Office of Legacy Management (LM)

entail "perpetual carem in the form of continuing environmental monitoring, custodial care, and maintenance. It should be noted, however, that the Transport to Hanford...

372

TITLE  

Office of Legacy Management (LM)

work. Subjects to be discussed will include types and levels of contamination, specific health and safety concerns, use of portable fire extinguishers, emergency response plan,...

373

Title:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in the atmosphere help to "trap" that heat. This process is also known as the "greenhouse effect." Sea Level and Global Warming Global temperature is believed to be gradually...

374

Title  

National Nuclear Security Administration (NNSA)

type of explosive. Thus, even if one assumed activation from several times as much thermonuclear yield as fission yield at NTS, radioactivity from the fission products would still...

375

Title  

National Nuclear Security Administration (NNSA)

manmade radionuclides from global fallout, that is, fallout from high-yield U.S. thermonuclear tests in the Pacific and tests conducted by other countries. (The contribution of...

376

TITLE:  

Broader source: Energy.gov (indexed) [DOE]

CITY/CO{TRIBAL): CITY/CO{TRIBAL): DATE RECEIVED: BRIEF DESCRIPTION: NEPA REVIEWER NEPA DECISION (CX/ EAtEIS) : NHPA ISSUES NEPA/NHPA CONDITIONS: * ENERGY Oak Ridge Office AK-TRIBE-NATIVE VILLAGE OF NELSON LAGOON CO MP LETE 800145422 STATE : AK Tribe Round Two Review: 0 2/8/2010 Energy effiCiency retrofits on the tribal council office building (insulation, vapor barriers, drywall and supplies, T111 sidmg, hardware, paint and primer, and respirators) S.G. Thornton ex CX APPLIED: CX-EEC8G -004 SUBPART D REF 82.5,85.1 None NEPA Compliance Officer (NCO) Review, including consideration of extraordinary circumstances : ~n may be categorically excluded from further NEPA review. I have determined that the proposed action meets the requirements for categorical exclusion in Subpart D, Appendix A or B.

377

Title  

Gasoline and Diesel Fuel Update (EIA)

External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem...

378

Title  

National Nuclear Security Administration (NNSA)

Oil and gas explosion near Yucca Mountain, Southern Nevada, (pg 1298-1315). Found in Proceeding of the Fifth International Conference, Las Vegas, NV, May 11-16, 1994. Author Grow,...

379

TELEPHONE LISTING AGENCY LOCATION TELEPHONE  

E-Print Network [OSTI]

, HPC) Camp Springs, MD COM 301-763-8201 AOC Tampa Bay, FL COM 813-828-3310 CPHC Forecaster and Warning Analyst) Pearl Harbor, HI COM 787-865-7007 DSN 471-3533 601 AOC/CODW Tyndall AFB, FL COM 850-283-5119 DSN

380

Section Number:  

Broader source: Energy.gov (indexed) [DOE]

QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVES Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. List A Pursuant to the contract clause entitled, "Laws, Regulations, and DOE Directives," the Contractor shall comply with the requirements of applicable Federal, State, and local laws and regulations, unless relief has been granted in writing by the appropriate regulatory agency. Omission of any applicable law or regulation from this list does not affect the obligation of the contractor to comply with such law or regulation. Laws & Regulations Title 10 CFR Part 2 Rules of Practice for Domestic Licensing Proceedings and Issuance of Orders

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Major Design Changes Late in Title II or early in Title III Can Be Costly  

Broader source: Energy.gov (indexed) [DOE]

Design Changes Late in Title II or Design Changes Late in Title II or early in Title III Can Be Costly PMLL Identifier: PMLL-2006-Y12-HEUMF-0001 (Source: User Submitted) Validator: Victoria Pratt Date: 4/24/2010 Contact: 202-586-7358 Statement: Expect increased costs as well as omissions and errors if significant design changes occur late in Title II or early in Title III Discussion: Numerous changes in design requirements late in Title II and early in Title III resulted in significant concurrency in the design-and-build process, making it difficult to avoid major schedule delays and meet commitments. Late in Title II, changes for the foundation and active confinement ventilation system resulted in areas of design immaturity, which led to further design changes and refinements in Title III. This necessitated major structural changes to address

382

Report Title: The Fossil Fuel Industry in New Mexico: A Comprehensive Impact Analysis Type of Report: Technical Report  

E-Print Network [OSTI]

Fuels 33 Summary Impacts 40 Works Cited 45 #12;3 List of Tables Table Title Page 1 Tax and Income Data0 Report Title: The Fossil Fuel Industry in New Mexico: A Comprehensive Impact Analysis Type AWARD Number: DE-NT0004397 Name and Address of Submitting Organization: Arrowhead Center New Mexico

Johnson, Eric E.

383

Independence) PROJECT TITLE: Clinton Community Human Service Campus Project  

Broader source: Energy.gov (indexed) [DOE]

Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Independence) PROJECT TITLE: Clinton Community Human Service Campus Project Page 1 of2 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 000052 EE0000162 GFO-0000162-015 EE162 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

384

RECIPIENT:Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit  

Broader source: Energy.gov (indexed) [DOE]

Chesterfield County Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000874 GFO-0000874-001 0 Based 011 my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

385

RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

', ', , , 1'.1 'Pagf;: 1 of 2 RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE: Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0003871 GFO-0003871-001 EE3871 Based on my review oftlle information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

386

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

Utah County STATE: UT Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-OOOOO13 EEOOOO889 GFO-O000889-002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, Inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

387

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE:  

Broader source: Energy.gov (indexed) [DOE]

: : Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number 09EE0000326 DE-EE0000326 GFO-OO00326-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

388

Dartmouth College HANOVER NEW HAMPSHIRE 03755-1420 Safety and Security 5 Rope Ferry Road #6156 Telephone (603) 646-4000 Fax (603) 646-1603  

E-Print Network [OSTI]

#6156 · Telephone (603) 646-4000 · Fax (603) 646-1603 Dear New Students; I want to welcome each of you

389

News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports  

Broader source: Energy.gov (indexed) [DOE]

2010 UMTRCA Title I and Title II Disposal Sites 2010 UMTRCA Title I and Title II Disposal Sites Reports Available News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports Available February 23, 2011 - 9:51am Addthis News Contact: DOE, Rich Bush, UMTRCA Program Lead (970) 248-6073 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 Grand Junction, Colo. - The U.S. Department of Energy announces the availability of the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites and the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites reports. In 2010, DOE's Office of Legacy Management was responsible for providing long-term surveillance and maintenance services at 25 uranium mill tailings

390

G Subject: Implementation of Division B, Title III, Title V and Division C  

Broader source: Energy.gov (indexed) [DOE]

B, Title III, Title V and Division C B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No. 112-74 References: Consolidated Appropriations Act, 2012, Title III, Section 301(a), 301(b), 316 Pub. L. No. 112-74 Title V, Sections 501, 504, 505 Title VII, Sections 725 When is this Financial Assistance Letter (FAL) effective? The statutory provisions addressed in this FAL were effective on the enactment date of the Consolidated Appropriations Act, 2012, December 23, 2011. When does this FAL expire? This FAL remains in effect until superseded or canceled. Who is the intended audience? Department of Energy (DOE) and National Nuclear Security Administration (NNSA) Contracting Officers. Who is the point of contact?

391

UNIT NUMBER:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

193 UNIT NUMBER: 197 UNIT NAME: CONCRETE RUBBLE PILE (30) REGULATORY STATUS: AOC LOCATION: Outside plant security fence, north of the plant on Big Bayou Creek on private property....

392

UNIT NUMBER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 UNIT NUMBER UNIT NAME Rubble oile 41 REGULATORY STATUS: AOC LOCATION: Butler Lake Dam, West end of Butler Lake top 20 ft wide, 10 ft APPROXIMATE DIMENSIONS: 200 ft long, base 30...

393

crd title p1.ai  

Broader source: Energy.gov (indexed) [DOE]

I I Nevada Rail Corridor SEIS Rail Alignment EIS - Chapters 1 and 2 U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2; the Nevada Rail Corridor SEIS), and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369; the Rail Alignment EIS) CONTACTS: For more information about this document, For general information on the DOE NEPA process,

394

crd title p1.ai  

Broader source: Energy.gov (indexed) [DOE]

SHEET SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2D; the Nevada Rail Corridor SEIS), and Draft Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369D; the Rail Alignment EIS) CONTACTS: For more information about this document, write or call: For general information on the DOE NEPA process, write or call: U.S. Department of Energy Office of Civilian Radioactive Waste Management

395

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

396

TOPIC INTRODUCTION Title page Combining Ca2+  

E-Print Network [OSTI]

1 TOPIC INTRODUCTION Title page Combining Ca2+ Imaging with Other Optical Techniques SHORT TITLE: Ca2+ Imaging and Other Optical Techniques Marco Canepari 1,2 , Dejan Zecevic 4 , Kaspar E Vogt 3 Descartes, 75006 Paris, France Address correspondence to: marco.canepari@ujf-grenoble.fr ABSTRACT Ca2

Paris-Sud XI, Université de

397

Title of Document | 1 UC Learning Center  

E-Print Network [OSTI]

Title of Document | 1 UC Learning Center Table of Contents Introduction to the UC Learning Center ......................................................................................................................................19 #12;Title of Document | 2 Last updated 6/30/10 Introduction to the UC Learning Center The UC. It is recommended that only supported browsers be used for eCourses to ensure proper tracking of completions. Plug

Gleeson, Joseph G.

398

Title II Disposal Sites Annual Report  

Broader source: Energy.gov [DOE]

This report presents the results of long-term surveillance and maintenance activities conducted by the DOE Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements.

399

MASSACHUSETTS AVENUE ChMBRIDGE'39, MASSACHUSETTS TELEPHONE UNrvn.,,r,  

Office of Legacy Management (LM)

2, .* 2, .* -' .l-.; . . *' ,. .:, ,-i&CLEAR METALS, INC. MA ,y 155 MASSACHUSETTS AVENUE ChMBRIDGE'39, MASSACHUSETTS TELEPHONE UNrvn.,,r, 4-5200 blr. Saul Strauch Technical Liason Division United States Atomic Energy Commission New York Operations Office 70 Columbus Avenue New York 23, New York SUBJECT:- Program for Uranium Recovery (Ref: S. Strauch to A. R. Kaufmnnn, B/30/55) Dear Mr. Strauch: With reference to Mr. K. E. Field's confidential memorandum of August 22, 1956, this is to advise tha.t Nuclea,r l,':etals, Inc., has no facilities for scrap recovery. Also, our reply to Section III of the memorandum must be based .on our operations during the fiscal year recently ended. During that period, normal uranium 3cra.p material3 were returned to the i\'ational Lead Company of Ohio, and enriched scrap materials

400

Notices Title of Collection: Paul Douglas Teacher Scholarship Program  

Broader source: Energy.gov (indexed) [DOE]

5 Federal Register 5 Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices Title of Collection: Paul Douglas Teacher Scholarship Program Performance Report. OMB Control Number: 1840-0787. Agency Form Number(s): ED Form 40-31P. Total Estimated Number of Annual Responses: 30. Total Estimated Annual Burden Hours: 360. Abstract: The purpose of this collection is to ensure that state education agencies are monitoring the fulfillment of the scholarship obligations by former Douglas scholars in accordance with legislation and regulations that governed the Paul Douglas Teacher Scholarship Program when the scholarships were granted. The respondents to this collection are former participating state education agencies (SEAs). This performance report is the only vehicle by which

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Student's Department: Course/Section Number  

E-Print Network [OSTI]

Student's Department: Course/Section Number: Course Title: Instructor: Explanation of why coursework has not yet been completed: Description of coursework remaining to be completed: Graduate Student is Requested: Arts & Sciences Students: Shriver Hall 28 (Graduate Affairs and Admissions Office) Engineering

Weaver, Harold A. "Hal"

402

Economics OFFICE: Nasatir Hall 305 In the College of Arts and Letters TELEPHONE: (619) 594-1675  

E-Print Network [OSTI]

192 Economics OFFICE: Nasatir Hall 305 In the College of Arts and Letters TELEPHONE: (619) 594 of Arts degree in economics. Major in economics with the B.A. degree in liberal arts and sciences. Emphasis in international economics. Emphasis in preprofessional studies. Minor in economics. The Major

Gallo, Linda C.

403

GRR/Section 15-AK-c - Title V Operating Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 15-AK-c - Title V Operating Permit GRR/Section 15-AK-c - Title V Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-AK-c - Title V Operating Permit 15AKCTitleVOperatingPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Environmental Conservation United States Environmental Protection Agency Regulations & Policies Alaska Statutes Alaska Administrative Code 18 AAC 50 Air Quality Control Triggers None specified Click "Edit With Form" above to add content 15AKCTitleVOperatingPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative One of the major initiatives Congress added to the Clean Air Act in 1990 is

404

Name of Contractor: ActioNet, Inc. Contract Number: DE-DT0003143  

Broader source: Energy.gov (indexed) [DOE]

Federal and Eligible Contractor Use (Contractors must obtain written Federal and Eligible Contractor Use (Contractors must obtain written approval from the DOE Contracting Officer) Name of Contractor: ActioNet, Inc. Contract Number: DE-DT0003143 Expiration Date: 04/12/2014 Brief description of the products or services available: Information Technology Support Services Type of Business: Small Business Extent of Competition: Competed within Alliant Small Business GWAC Contract Specialist: Arness Harris Telephone Number: (202) 287-1601 E-Mail Address: arness.harris@hg.doe.gov For ordering information contact: OCIO COR: Tim Beckham COR Telephone Number: (301) 903-3187 Name of Contractor: DLT Solutions, Inc. Contract Number: DE-AB01-071M00180 Expiration Date: 03/20/2013 Brief description of the products or services available: Red Hat Proprietary Computer Software

405

The collision of Title III and Title V: A potential permitting and enforcement nightmare  

SciTech Connect (OSTI)

The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

Facca, G.; Faler, M.

1998-12-31T23:59:59.000Z

406

Notices Total Estimated Number of Annual  

Broader source: Energy.gov (indexed) [DOE]

72 Federal Register 72 Federal Register / Vol. 78, No. 181 / Wednesday, September 18, 2013 / Notices Total Estimated Number of Annual Burden Hours: 10,128. Abstract: Enrollment in the Federal Student Aid (FSA) Student Aid Internet Gateway (SAIG) allows eligible entities to securely exchange Title IV, Higher Education Act (HEA) assistance programs data electronically with the Department of Education processors. Organizations establish Destination Point Administrators (DPAs) to transmit, receive, view and update student financial aid records using telecommunication software. Eligible respondents include the following, but are not limited to, institutions of higher education that participate in Title IV, HEA assistance programs, third-party servicers of eligible institutions,

407

Title 40 CFR 261 Identification and Listing of Hazardous Waste...  

Open Energy Info (EERE)

Waste (2014). Retrieved from "http:en.openei.orgwindex.php?titleTitle40CFR261IdentificationandListingofHazardousWaste&oldid793417" Categories: References...

408

TAC Title 30 - Environmental Quality | Open Energy Information  

Open Energy Info (EERE)

TAC Title 30 - Environmental Quality Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: TAC Title 30 - Environmental...

409

Author Ziegler, Susan Benner, Ronald Title Effects of solar radiation ...  

Science Journals Connector (OSTI)

Author Ziegler, Susan Benner, Ronald Title Effects of solar radiation on dissolved ... M. Title Declining carrying capacity in the Bering Sea: Isotopic evidence from...

410

Document ID Number: RL-721  

Broader source: Energy.gov (indexed) [DOE]

Document ID Number: Document ID Number: RL-721 REV 4 NEPA REVIEW SCREENING FORM DOE/CX-00066 I. Project Title: Nesting Bird Deterrent Study at the 241-C Tank Farm CX B3.8, "Outdoor Terrestrial Ecological and Environmental Research" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform an outdoor, terrestrial ecological research study to attempt to control and deter nesting birds at the 241-C Tank Farm. This will be a preventative study to test possible methods for controlling &/or minimizing the presence and impacts of nesting birds inside the tank farm. A nesting bird

411

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

processes to promote development and operation of sustainable buildings. #12;Policies, Procedures and Guidelines Complete Policy Title: Sustainable Building Policy Policy this electronic policy and the written copy held by the policy owner, the written copy prevails. Sustainable

Haykin, Simon

412

Title: China Dimensions Data Collection Data Creator /  

E-Print Network [OSTI]

Title: China Dimensions Data Collection Data Creator / Copyright Owner: Center for International holds wide range of natural science and socioeconomic research and educational activities of China. These databases are integrated with agricultural, land use, environmental, socioeconomic data to track China

413

February 25, 2014 POSITION TITLE: Community Director  

E-Print Network [OSTI]

; regulating safety operations; performing collateral tasks including staff selection, training and developmentFebruary 25, 2014 POSITION TITLE: Community Director PERSONNEL STATUS: Exempt, Full-Time, Regular the management and administration of daily residential community operations; providing crisis response; serving

Maryland, Baltimore County, University of

414

COURSE TITLES COURSE DESCRIPTIONS Organizational Behavior &  

E-Print Network [OSTI]

COURSE TITLES COURSE DESCRIPTIONS MGT 5371 Organizational Behavior & Organizational Design Examines management of individual, interpersonal, group and intergroup relations, organizational design and experiential learning to accelerate their development as authentic leaders. MGT 5373 Opportunity Creation

Rock, Chris

415

What every designated representative should know about Title IV and Title V enforcement provisions  

SciTech Connect (OSTI)

Title IV of the Clean Air Act not only created a regulatory program unlike any other under the Clean Air Act, but also established a unique position--the designated representative--as an integral part of the program. The designated representative is required to meet certain basic obligations under Title IV, and a panoply of enforcement mechanisms are available to EPA in the event of noncompliance with these obligations. Also, because a designated representative may take on responsibilities under the permit provisions of Title V of the Clean Air Act, the designated representative can also be subject to an enforcement action for failure to comply with certain Title V permit requirements. This paper considers the basic definition of the designated representative under EPA`s Title IV and Title V regulations, identifies the responsibilities assigned to the designated representative, and then analyzes the enforcement mechanisms that may be applied to the designated representative if a regulatory responsibility has not been satisfied.

Bischoff, C.A. [Gallagher and Kennedy, Phoenix, AZ (United States); Dayal, P. [Tucson Electric Power Co., Tucson, AZ (United States)

1995-12-31T23:59:59.000Z

416

Title I Disposal Sites Annual Report  

Broader source: Energy.gov [DOE]

This report presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements.

417

2012 EL Project Title and Number: Model-Based Engineering Program Title: Systems Integration for Manufacturing and Construction  

E-Print Network [OSTI]

for Manufacturing and Construction Applications Principal Investigator: Joshua Lubell, 734 Project Staff Name Josh Lubell Robert Lipman Allison Barnard Feeney Simon Frechette Chris Brown Kenway Chen Albert Jones Craig

Perkins, Richard A.

418

Case Number:  

Broader source: Energy.gov (indexed) [DOE]

Name of Petitioner: Name of Petitioner: Date of Filing: Case Number: Department of Energy Washington, DC 20585 JUL 2 2 2009 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Appeal Dean P. Dennis March 2, 2009 TBA-0072 Dean D. Dennis filed a complaint of retaliation under the Department of Energy (DOE) Contractor Employee Protection Program, 10 C.F.R. Part 708. Mr. Dennis alleged that he engaged in protected activity and that his employer, National Security Technologies, LLC (NSTec ), subsequently terminated him. An Office of Hearings and Appeals (OHA) Hearing Officer denied relief in Dean P. Dennis, Case No. TBH-0072, 1 and Mr. Dennis filed the instant appeal. As discussed below, the appeal is denied. I. Background The DOE established its Contractor Employee Protection Program to "safeguard public

419

KPA Number  

Broader source: Energy.gov (indexed) [DOE]

Supports CMM-SW Level 3 Supports CMM-SW Level 3 Mapping of the DOE Information Systems Engineering Methodology to the Software Engineering Institute (SEI) Software Capability Maturity Model (CMM-SW) level 3. Date: September 2002 Page 1 KPA Number KPA Activity SEM Section SEM Work Product SQSE Web site http://cio.doe.gov/sqse ORGANIZATION PROCESS FOCUS OPF-1 The software process is assessed periodically, and action plans are developed to address the assessment findings. Chapter 1 * Organizational Process Management * Process Improvement Action Plan * Methodologies ! DOE Methodologies ! SEM OPF-2 The organization develops and maintains a plan for its software process development and improvement activities. Chapter 1 * Organizational Process Management * Process Improvement

420

Major Design Changes Late in Title II or early in Title III Can...  

Office of Environmental Management (EM)

avoid major schedule delays and meet commitments. Late in Title II, changes for the foundation and active confinement ventilation system resulted in areas of design immaturity,...

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments  

SciTech Connect (OSTI)

This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

None

1999-02-01T23:59:59.000Z

422

Full Name: Vicki Gray, PT, PhD Title(s): UMANRRT PostDoctoral Fellow  

E-Print Network [OSTI]

Full Name: Vicki Gray, PT, PhD Title(s): UMANRRT PostDoctoral Fellow Email: vgray and Rehabilitation Sciences in the field of Physical Therapy. Her Ph.D. thesis focused on the motor control of fast continued to work in Dr Jayne Garland's Neural Control of Force Production and Movement Lab

Weber, David J.

423

RIN Number 1904-AB68  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Federal Procurement of Energy Efficient Products Federal Procurement of Energy Efficient Products RIN NUMBER: 1904-AB68 CLOSING DATE: August 20, 2007 COMMENT NUMBER DATE RECEIVED/ DATE OF LETTER NAME & TITLE OF COMMENTATOR AFFILIATION & ADDRESS OF COMMENTATOR 1 ? 7/31/07 Edwin Pinero Federal Environmental Executive Office of the Federal Environmental Executive 1200 Pennsylvania Avenue, NW Mail Code 1600J Washington, DC 20460 2 8/8/07 (e-mail) Bob Null President Arkansas Lamp Manufacturing bnull@arkansaslamp.com 3 8/10/07 (e-mail) Dawn Gunning Environmental Program Manager Department of Justice Dawn.M.Gunning@usdoj.gov 4 8/14/07 8/14/07 Kyle Pitsor Vice President, Government Relations National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752 Rosslyn, VA 22209

424

RL·721 Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

Document ID Number: Document ID Number: REV 3 NEPA REVIEW SCREENING FORM DOE/CX-00045 . J.proj(;l~t Titl~: - - - -- - - - - - - - - - - - - - - - - - -- --------- ------_. . _ - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - LIMITED FIREBREAK MAINTENANCE ON THE HANFORD SITE DURING CALENDAR YEAR 2012 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions· e.g., acres displaced/disturbed, excavation length/depth, etc.): The Department of Energy (DOE) proposes to perform firebreak maintenance in selected areas of the Hanford Site during calendar year 2012 with limited use of physical, chemical, and prescribed burning methods. Prescribed burning will be performed by the Hanford Fire Department under approved burn plans and permits; and only in previously disturbed

425

Report Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data  

E-Print Network [OSTI]

Report Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Annual Technical Report Reporting Period Start Date: October 1, 2002 Reporting Period Liu, Guohua Gao & Ruijian Li Date Report Issued: March 2004 DOE Award Number: DE-FC26-00BC15309

Reynolds, Albert C.

426

Report Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data  

E-Print Network [OSTI]

Report Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Annual Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period, Ruijian Li, Yafes Abacioglu & Yannong Dong Date Report Issued: December 2001 DOE Award Number: DE-FC26

Reynolds, Albert C.

427

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate  

E-Print Network [OSTI]

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

California at Davis, University of

428

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local Agencies  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local each agency or organization) DOT $30,000 Total Project Cost $30,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates January 2014 to December 2014 Brief Description of Research Project

California at Davis, University of

429

Project Information Form Project Title White Paper on The application of permeable pavement with emphasis  

E-Print Network [OSTI]

Project Information Form Project Title White Paper on The application of permeable pavement (by each agency or organization) Cal Trans Total Project Cost $29,007 Agency ID or Contract Number Project Depending on the type of surface pavement, permeable pavement can be termed as porous asphalt

California at Davis, University of

430

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia Institute of Technology  

E-Print Network [OSTI]

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia or organization) DOT - $92,292.15 Total Project Cost $92,292.15 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 2013 - June 2015 Brief Description of Research Project Local governments are using

California at Davis, University of

431

Project Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Capacity  

E-Print Network [OSTI]

or organization) DOT $95,000 Total Project Cost $95,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Dates August 1, 2014 to July 31, 2015 Brief Description of Research Project The transportation industry

California at Davis, University of

432

Project Information Form Project Title Accelerating Commercialization of Alternative and Renewable Fuels and  

E-Print Network [OSTI]

or organization) CEC $344,546 Total Project Cost $344,546 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Accelerating Commercialization of Alternative and Renewable and End Dates June 30, 2014 to June 30, 2016 Brief Description of Research Project Alternative

California at Davis, University of

433

Project Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel Vehicles for  

E-Print Network [OSTI]

agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract Number DTRT13-GProject Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel-UTC29 Start and End Dates May 16, 2014 to May 31, 2015 Brief Description of Research Project

California at Davis, University of

434

Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal Control  

E-Print Network [OSTI]

,387 Total Project Cost $59,387 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates 4/14/2014 ­ 9Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal/30/15 Brief Description of Research Project Today's conventional traffic control strategies typically rely

California at Davis, University of

435

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,942 Total Project Cost $38,942 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

436

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network [OSTI]

or organization) US DOT $38,925 Total Project Cost $38,925 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

437

Project Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

438

Project Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions: What Roles do  

E-Print Network [OSTI]

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

439

Project Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications for Freight  

E-Print Network [OSTI]

or organization) Caltrans $50,000 Total Project Cost $50,000 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications and End Dates August 15, 2014 to August 14 2015 Brief Description of Research Project This project

California at Davis, University of

440

Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid  

E-Print Network [OSTI]

,365 Total Project Cost $58,365 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates April 1, 2014Project Information Form Project Title Advanced Energy Management Strategy Development for Plug ­ September 30, 2015 Brief Description of Research Project Plug-in hybrid vehicles (PHEVs) have great

California at Davis, University of

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Project Information Form Project Title White Paper of Assessing Transportation Financing Options from a Green  

E-Print Network [OSTI]

or organization) US DOT $23,700 Total Project Cost $23,700 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper of Assessing Transportation Financing Options and End Dates June 15, 2014 to August 31, 2014 Brief Description of Research Project The Highway Trust

California at Davis, University of

442

Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based  

E-Print Network [OSTI]

,931.44 Total Project Cost $98,931.44 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 1Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle, 2014 ­ October 31, 2015 Brief Description of Research Project Current greenhouse gas emissions

California at Davis, University of

443

Project Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve  

E-Print Network [OSTI]

or organization) $25,217 Total Project Cost $25,217 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve Dates 4/1/14 ­ 3/30/15 Brief Description of Research Project There have been a variety of traffic

California at Davis, University of

444

Project Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy via ITS  

E-Print Network [OSTI]

each agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract NumberProject Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy Project Currently trucks are viewed as any other vehicle in traffic management Currently trucks are viewed

California at Davis, University of

445

Policy Title: Purchasing Card HARVARD UNIVERSITY FINANCIAL POLICY Responsible Office: UFS  

E-Print Network [OSTI]

Policy Title: Purchasing Card HARVARD UNIVERSITY FINANCIAL POLICY Responsible Office: UFS Effective Date: April 1, 2010 Revision Date:PURCHASING CARD Policy Number: UFS100 HARVARD UNIVERSITY FINANCIAL POLICY POLICY STATEMENT Harvard Purchasing Cards (PCards) are University-liability credit cards issued

446

The preparation for and survival of an EPA Title IV and Title V facility audit  

SciTech Connect (OSTI)

As part of the 1990 Clean Air Act Amendments, major facilities are required to obtain federally enforceable operating permits (Title V). In a separate permitting action, the electric utilities with units generating more then 25 megawatts are required to obtain permits for NO{sub x} and SO{sub x}, the emissions which contribute to acid rain (Title IV). The Title IV permit is included as part of the Title V permit. This paper will use an actual audit experience at a coal fired generation facility as a case study for the preparation for and outcome of an EPA Title IV Level 3 audit. The paper will document the procedures for preparation, the audit process, and the outcome. The audit is part of the EPA's process for review of the record keeping and instrument calibration methods outlined in Title IV. Both types of permits have many different record keeping and monitoring requirements as well as separate reporting requirements which are submitted to both federal; state and local regulatory agencies for review and evaluation. Title IV units include very specific instrument calibration/audit requirements, and Title V has compliance testing and monitoring requirements. Alliant Power was notified in August 1998 of the intent of EPA Region VII to conduct a Level 3 audit at the Lansing Generation Station. The US EPA and the State of Iowa intended to review all Title IV record keeping (Level 1), continuous emission monitoring calibrations and linearity testing (Level 2) and observe the annual Relative Accuracy Testing Audit performed by an outside contractor. In addition, during this facility site visit, the compliance with Title V permit requirements was also audited.

Facca, G.L.; Faler, M.

1999-07-01T23:59:59.000Z

447

Mailing Addresses and Information Numbers for Operations, Field, and Site  

Broader source: Energy.gov (indexed) [DOE]

About Energy.gov » Mailing Addresses and Information Numbers for About Energy.gov » Mailing Addresses and Information Numbers for Operations, Field, and Site Offices Mailing Addresses and Information Numbers for Operations, Field, and Site Offices Name Telephone Number U.S. Department of Energy Ames Site Office 111 TASF, Iowa State University Ames, Iowa 50011 515-294-9557 U.S. Department of Energy Argonne Site Office 9800 S. Cass Avenue Argonne, IL 60439 630-252-2000 U.S. Department of Energy Berkeley Site Office Berkeley National Laboratory 1 Cyclotron Road Berkeley, CA 94720 510-486-5784 U.S. Department of Energy Bonneville Power Administration P.O. Box 3621 905 NE 11th Avenue Portland, OR 97232 Bonneville Power Administration General and Regional Offices 503-230-3000 U.S. Department of Energy Brookhaven Site Office Upton, NY 11973 631-344-5050

448

Title list of documents made publicly available, April 1--30, 1990  

SciTech Connect (OSTI)

The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979.

Not Available

1990-07-01T23:59:59.000Z

449

Title list of documents made publicly available, February 1--28, 1990  

SciTech Connect (OSTI)

The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes docketed material associated with civilian nuclear power plants and other uses of radioactive materials, and nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979.

Not Available

1990-06-01T23:59:59.000Z

450

Retail Lighting: Title 24 & Technology Update  

E-Print Network [OSTI]

Retail Lighting: Title 24 & Technology Update Kelly Cunningham Outreach Director kcunning as an implied endorsement. 10/31/2014 PRESENTATION DISCLAIMERSLIDE 2 #12;Pacific Energy Center H663 Retail, or inspect lighting installations in new and remodeled retail spaces. Those who attend will get to tour CLTC

California at Davis, University of

451

*** TITLE *** Reports on Astronomy 2009-2012  

E-Print Network [OSTI]

*** TITLE *** Reports on Astronomy 2009-2012 ***NAME OF EDITORS*** c 2012 International on HISTORICAL RADIO ASTRONOMY CHAIR Kenneth Kellermann VICE-CHAIR Wayne Orchiston BOARD Rod Davies Leonid TRIENNIAL REPORT 2009-2012 1. Introduction The IAU Working Group on Historical Radio Astronomy (WGHRA

Groppi, Christopher

452

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: McMaster University Sustainability a high degree of vegetative surface while limiting the use of pesticides, harmful chemicals and the need; and · experiment with alternative paving methods that will incorporate vegetation. Transportation The University

Haykin, Simon

453

Title: Oak Ridges Moraine Data Creator /  

E-Print Network [OSTI]

Title: Oak Ridges Moraine Data Creator / Copyright Owner: Ontario Ministry of Natural Resources. Ministry of Natural Resources. "Oak Ridges Moraine" [electronic resource: vector]. Peterborough, Ontario: NAD83 /UTM Resolution: N/A Coordinates: N/A Index Map: N/A Keywords (Place): Oak Rides Moraine

454

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Procedures for Faculty Appeal Tribunals are used in these procedures: 1. `Appellant' means a faculty member who is entitled to appeal a tenure, within the Policy, Section IV, clauses 6(a) and 6(b). II Documents Governing Appeal Procedures

Hitchcock, Adam P.

455

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Faculty General Grievance Procedure. OBJECTIVE This Procedure is designed to provide McMaster faculty members with prompt and impartial by existing, specific review procedures. It is intended to facilitate and promote informal resolution

Haykin, Simon

456

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Procedures for University Reviews copy held by the policy owner, the written copy prevails. #12;Procedures for University Reviews of Academic Departments April 28, 2005 1 Procedures for University Reviews of Academic Departments1 I

Haykin, Simon

457

Proposed Start Date: Title of Project  

E-Print Network [OSTI]

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

458

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

459

SUMMER JOB: Job Title: Cotton Scout  

E-Print Network [OSTI]

SUMMER JOB: Job Title: Cotton Scout Location: Georgetown, TX area / Williamson & Milam Counties Description: Cotton scouts will aid in conducting the Williamson/Milam County Cotton IPM program by scouting cotton fields and reporting on crop status and pest and beneficial insect abundance. Must be able to work

Behmer, Spencer T.

460

Title: Academic Advisor Employment Type: Administrative Professional  

E-Print Network [OSTI]

Title: Academic Advisor Employment Type: Administrative Professional College: Engineering is seeking a full time academic advisor to collaborate with faculty and ECE staff to coordinate and advise faculty, 250 undergraduate students and 150 graduate students. The advisor will work closely together

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

RULES AND REGULATIONS Title 7--AGRICULTURE  

E-Print Network [OSTI]

RULES AND REGULATIONS Title 7--AGRICULTURE DEPARTMENT OF AGRICULTURE [7 PA. CODE CH. 130b] Nutrient Management Certification [35 Pa.B. 6504] The Department of Agriculture (Department), under section 7(a or the Senate or House Agricultural and Rural Affairs Committees regarding the proposed rulemaking

Guiltinan, Mark

462

Project title: Principal Investigator(s)  

E-Print Network [OSTI]

No. 0123 Project title: Principal Investigator(s): Funding Agency: Submission deadline: Instruments, redeployment costs) OBS engineering and technical support cost: (on shore and at sea) Shipping: Travel and technical support for OBS operations at sea. The cost of providing this support (e.g., instrument charges

Menke, William

463

Title: Robot Arm Demonstration Supervisor: Alexander Frster  

E-Print Network [OSTI]

UROP 2009 Title: Robot Arm Demonstration Supervisor: Alexander Förster Sponsor: Luca Gambardella / UROP Keywords: programming language C++, Qt-framework, Katana robot arm, computer vision Prerequisites based controlled robot arm. The computer vision system has to detect the position and orientation

Krause, Rolf

464

Title Slide "The broadband acoustic output of  

E-Print Network [OSTI]

Title Slide "The broadband acoustic output of marine seismic airgun sources" Les Hatton CISM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #12;Seismic sources ­ marine airguns Introduction Modelling Marine Life Impact Where next Overview #12 Normal speed surface movie of airgun firing Courtesy IO limited #12;Seismic sources ­ marine airguns

Hatton, Les

465

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 13 February, Noon Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

466

Project Title: Thematic Analysis of Forensic  

E-Print Network [OSTI]

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 1 February, 2012 Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

467

Learning About the Equal Employment Opportunity - Title VII - Complaint  

Broader source: Energy.gov (indexed) [DOE]

Learning About the Equal Employment Opportunity - Title VII - Learning About the Equal Employment Opportunity - Title VII - Complaint Process Learning About the Equal Employment Opportunity - Title VII - Complaint Process Learn about what is unlawful under Title VII, the legislation behind it, the steps before filing a complaint (mediation), how an individual files an official Title VII complaint, the acceptance or dismissal process, the investigation process, and the resolution process. Your Coverage Under Equal Employment Opportunity - Title VII A discriminatory action is unlawful under Title VII if: The discriminating party is an employer, employment agency or labor organization defined by Title VII; The basis for the alleged discrimination is race, color, religion, sex, national origin, or retaliation. This issue or claim involves a discriminatory matter or personnel

468

RL-721 Document ID Number:  

Broader source: Energy.gov (indexed) [DOE]

4 4 NEPA REVIEW SCREENING FORM DOE/CX-00075 I. Project Title: Project 1-718, Electrical Utili ties Transformer Management Support Facility II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): The proposed action includes design, procurement, and construction of a pre-engineered metal building for transformer management; including inspections, routine maintenance, testing, refurbishing, and disposition of excess transformers. The building will be constructed in the previously disturbed, gravel-covered electrical utilities lay-down yard west of the 2101-M Building in 200 East Area of the Hanford Site. The building footprint

469

Title 40 CFR Part 191 Subparts B and C  

E-Print Network [OSTI]

Plant Carlsbad Field Office Carlsbad, New Mexico #12;Inspections (40 CFR § 194.21) #12;Title 40 CFR Part

470

Title 40 CFR Part 191 Subparts B and C  

E-Print Network [OSTI]

Pilot Plant Carlsbad Field Office Carlsbad, New Mexico #12;Removal of Waste (40 CFR § 194.46) #12;Title

471

Title 40 CFR Part 191 Subparts B and C  

E-Print Network [OSTI]

Plant Carlsbad Field Office Carlsbad, New Mexico #12;Structure of the CRA-2009 #12;Title 40 CFR Part 191

472

Title 40 CFR Part 191 Subparts B and C  

E-Print Network [OSTI]

Pilot Plant Carlsbad Field Office Carlsbad, New Mexico #12;Expert Judgment (40 CFR § 194.26) #12;Title

473

CIP CIP Title Degree Level 3 NATURAL RESOURCES AND CONSERVATION  

E-Print Network [OSTI]

CIP CIP Title Degree Level 3 NATURAL RESOURCES AND CONSERVATION 3.0104 Environmental Science M 4 B FAU Academic Program Inventory #12;CIP CIP Title Degree Level 15 ENGINEERING TECHNOLOGIES Enforcement, Firefighting and Related Protective Services, Other B #12;CIP CIP Title Degree Level 44 PUBLIC

Fernandez, Eduardo

474

Title/Loc/Date: Slide # 1 Jo EllisMonaghan  

E-Print Network [OSTI]

Title/Loc/Date: Slide # 1 Jo Ellis­Monaghan e­mail: joellis@emba.uvm.edu website: http://academics.smcvt.edu/jellis­monaghan #12; Title/Loc/Date: Slide # 2 29(59,(:# . First some problems (network reliability, scheduling; Title/Loc/Date: Slide # 3 6RPH#3UHOLPLQDULHV# # 'HOHWLRQ

Ellis-Monaghan, Joanna

475

Title Page Applied and Environmental Microbiology 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Applied and Environmental Microbiology 1 Applied and Environmental Microbiology 1 2 Title Natural Competence in Thermoanaerobacter and Thermoanaerobacterium Species 3 Running Title Thermonanerobacter Natural Competence 4 5 Authors and Affiliations 6 A. Joe Shaw 1,2 , David A. Hogsett 1 , Lee R. Lynd 1,2,3 * 7 1 Mascoma Corporation, Lebanon, NH 03766 8 2 Thayer School of Engineering, Dartmouth College, Hanover, NH 03755 9 3 Department of Biological Sciences, Dartmouth College, Hanover, NH 03755 10 11 Corresponding Author 12 Lee R. Lynd 13 Thayer School of Engineering, Dartmouth College, Hanover, NH 03755 14 Phone: 603.646.2231 15 Email: lee.lynd@dartmouth.edu 16 17 18 19 20 21 22 23 Copyright © 2010, American Society for Microbiology and/or the Listed Authors/Institutions. All Rights Reserved.

476

Field Description Source Who is providing this information? Please provide Name, telephone number, affiliation, email so that we may contact you if clarification is needed  

E-Print Network [OSTI]

the source to the crop Cultivation ­ Activities involved with maintaining growth such as fertilization and weed control Harvesting ­ Reaping the energy crop (biostock product) Collect/Transport to Processor descriptive name for this model Crop What biostock crops or other inputs into the bioenergy conversion

477

TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI-  

Gasoline and Diesel Fuel Update (EIA)

6 STAT. 2962 6 STAT. 2962 PUBLIC LAW 107-347-DEC. 17 2002 TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI- CIENCY SEC. 501. SHORT TITLE. This title may be cited as the ''Confidential Information Protec- tion and Statistical Efficiency Act of 2002''. SEC. 502. DEFINITIONS. As used in this title: (1) The term ''agency'' means any entity that falls within the definition of the term ''executive agency'' as defined in section 102 of title 31, United States Code, or ''agency'', as defined in section 3502 of title 44, United States Code. (2) The term ''agent'' means an individual- (A)(i) who is an employee of a private organization or a researcher affiliated with an institution of higher learning (including a person granted special sworn status by the Bureau of the Census under section 23(c) of title

478

Climate Zone Number 1 | Open Energy Information  

Open Energy Info (EERE)

Climate Zone Number 1 Climate Zone Number 1 Jump to: navigation, search A type of climate defined in the ASHRAE 169-2006 standard. Climate Zone Number 1 is defined as Very Hot - Humid(1A) with IP Units 9000 < CDD50ºF and SI Units 5000 < CDD10ºC Dry(1B) with IP Units 9000 < CDD50ºF and SI Units 5000 < CDD10ºC . The following places are categorized as class 1 climate zones: Broward County, Florida Hawaii County, Hawaii Honolulu County, Hawaii Kalawao County, Hawaii Kauai County, Hawaii Maui County, Hawaii Miami-Dade County, Florida Monroe County, Florida Retrieved from "http://en.openei.org/w/index.php?title=Climate_Zone_Number_1&oldid=21604" Category: ASHRAE Climate Zones What links here Related changes Special pages Printable version Permanent link Browse properties

479

BusGuide v.3 8/07 Telephone Feature Service Guide  

E-Print Network [OSTI]

a dial tone. Dial 9 followed by the desired number. If you hear a "stutter" or interrupted tone, reenter, your line will incur any applicable charges. Dial *72. You will hear a "stutter" or interrupted tone. Standard Instrument: Press the hookswitch briefly and release. You will hear a "stutter" or interrupted

California at Santa Barbara, University of

480

Geographic Inaccuracy of Cell Phone Samples and the Effect on Telephone Survey Bias, Variance, and Cost  

Science Journals Connector (OSTI)

......be young, non-Hispanic white only and...homes, live in households that do not contain...of adults in the household 2 0.37 Number of children in the household 2 4.01 Metropolitan...Race/ethnicity Hispanic 0.35** 0......

Benjamin Skalland; Meena Khare

2013-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "title telephone number" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 15 3 Project management and coordination 15 4 Cost breakdown 15 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality;cation: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

482

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network [OSTI]

and achievements . . . . . . . . . . . . . . 17 3 Project management and coordination 17 4 Cost breakdown 17 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality Classification: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

483

CTB Ground Strap Size Document Number R ev  

E-Print Network [OSTI]

5 5 4 4 3 3 2 2 1 1 D D C C B B A A CTB Ground Strap Title Size Document Number R ev Date: Sheet o Body 5x"VNTC"#10awgrated33A Actualoperating=11Amax. Belden 83029 #18 awg rated 10 A max. Actual

Llope, William J.

484

CS 4317 Human-Computer Interaction Course Number: CS4317  

E-Print Network [OSTI]

interaction. Theory of human-computer interaction. Development methods for interfaces such as user1 CS 4317 Human-Computer Interaction Course Number: CS4317 Course Title: Human-Computer Interaction Course Instructors Nigel Ward Course Description: CS4317: Models and methods of human-computer

Ward, Karen

485

Awards Received in March 2010 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network [OSTI]

FOR VISUAL REALISM IN SCALE-COMPLEX SCENES 98,337. MBF 51958 BARBASCH, DAN MATH NSF UNIPOTENT REPRESENTATIONS B SEELEY, ROBIN WEEKS, HAROLD JOHN SHOALS NSF (NSF BIO) UPGRADE OF SANITATION AND COMMUNICATION, JAMES M NAIC NSF A TECHNOLOGY DEVELOPMENT PROJECT FOR THE LARGE-N / SMALL-D SQUARE KILOMETER ARRAY

Danforth, Bryan Nicholas

486

1. Department, Course Number, Title ORE 608, Probability and Statistics for Ocean Engineers  

E-Print Network [OSTI]

and ocean engineering. 7. Topics Covered Random Variables Monte Carlo Methods Probability Density Functions and statistics Water wave mechanics 5. Textbooks and/or Other Reading Material Textbooks: None Reference books: 1. Data Analysis Methods in Physical Oceanography - Emery and Thomson 2. Extreme Value Theory

Frandsen, Jannette B.

487

1. Department, Course Number, Title ORE 766 Numerical Methods in Ocean Engineering  

E-Print Network [OSTI]

Course Learning Outcomes 7. Topics Covered 1. MATLAB fundamentals 2. Solving linear systems 3. Curve of Criterion 5 Assessment Homework 60% Final project 40% #12;Contribution to Professional Component Engineering by practical implementation in MATLAB. After a review of programming in MATLAB and basic numerical methods

Frandsen, Jannette B.

488

1. Department, course number, and title ORE 654 Applications of Ocean Acoustics  

E-Print Network [OSTI]

, and bioacoustics. Topics include: marine mammals, fish and plankton imaging, navigation and communication, sound of seismics, ships, wind and rain, using sound to study ocean dynamics, flow imaging and measurement, mapping the ocean. The course will provide an overview of the fundamentals of sound propagation, sound of seismics

Frandsen, Jannette B.

489

Title University Physics I Laboratory Number PHYS 2125-2L1  

E-Print Network [OSTI]

-547-22748-5. · Recommended: Data Reduction and Error Analysis for the Physical Sciences. P. R. Bevington and D. K. Robinson Uncertainty (Error) and Data Analysis 24-Jan 2 Measurement Instruments (Mass, Volume, and Density) 31-Jan 3:00-3:00, TR 1:00-3:00 Department Engineering, Mathematics, and Physics College Arts and Sciences Institution

Milovich, David

490

Title University Physics I Laboratory Number PHYS 2125-2L2  

E-Print Network [OSTI]

-547-22748-5. · Recommended: Data Reduction and Error Analysis for the Physical Sciences. P. R. Bevington and D. K. Robinson Uncertainty (Error) and Data Analysis 26-Jan 2 Measurement Instruments (Mass, Volume, and Density) 2-Feb 3:00-3:00, TR 1:00-3:00 Department Engineering, Mathematics, and Physics College Arts and Sciences Institution

Milovich, David

491

Title University Physics I Laboratory Number PHYS 2125-2L1  

E-Print Network [OSTI]

: $30. Textbooks required. · Data Reduction and Error Analysis for the Physical Sciences. P. R will test your knowledge of physical theory, error analysis, and laboratory procedure relevant, Mathematics, and Physics College Arts and Sciences Institution Texas A&M International University Term Spring

Milovich, David

492

1. Department, Course Number, Title ORE 678, Marine Mineral Resources Engineering  

E-Print Network [OSTI]

Nodules and Marine Mining · Deep Sea Mining Technology · Minerals Processing · Offshore Oil and Gas · Oil · Formation Processes of Polymetallic Sulfides (PMS) on the Ocean Floor: Geology of the Smoker and PMS · Chemistry of Hydrothermal Vents and Polymetallic Sulfides · PMS Deposits: From Smoker to an Ore Body · Case

Frandsen, Jannette B.

493

COURSE NUMBER COURSE TITLE, PROFESSOR MAC 503, Introduction to Marine and Atmospheric Chemistry  

E-Print Network [OSTI]

Professors F. Millero and E. Atlas COURSE GOALS: Introduction to Marine and Atmospheric Chemistry. The course/Circulation/Transport 16. Trace Gas Exchanges and Biogeochemical Cycles;Biosphere-Atmosphere Exchanges 17. Biogeochem (cont

Miami, University of

494

Grant Title: W. K. KELLOGG FOUNDATION Funding Opportunity Number: N/A  

E-Print Network [OSTI]

, and communities as they strengthen and create conditions that propel vulnerable children to achieve success, and communities as they strengthen and create conditions that propel vulnerable children to achieve success

Farritor, Shane

495

DOE Award Number DE-SC0006012 Recipient: NCAR Project Title:...  

Office of Scientific and Technical Information (OSTI)

provided under this award covered participant travel to this workshop. A resulting white paper (http:www.cesm.ucar.eduworkinggroupsSocietalwhite.paper.pdf) identified...

496

2011 EL Project Title and Number: Sustainability of Unit Manufacturing Processes  

E-Print Network [OSTI]

such as energy and material consumption, emissions, waste, and water usage of manufacturing processes. However sustainability performance metrics (such as energy and material consumption, emissions, waste, and water usage efficiency, the US industries need reliable measurement methods to evaluate sustainability performances

Perkins, Richard A.

497

Docket Number: 12-AFC-03 Project Title: Redondo Beach Energy Project  

E-Print Network [OSTI]

Beach Generating Station, an operating power plant. RBEP is a proposed natural-gas fired, combined the existing and still operational AES Redondo Beach Generating Station. RBEP will consist of one power block composed of three natural gas combustion turbine generators (CTG), three supplemental-fired heat recovery

498

Title list of documents made publicly available, December 1--31, 1989  

SciTech Connect (OSTI)

The Title List of Documents Made Publicly Available is a monthly publication. It contains descriptions of the information received and generated by the US Nuclear Regulatory Commission (NRC). This information includes (1) docketed material associated with civilian nuclear power plants and other uses of radioactive materials and (2) nondocketed material received and generated by NRC pertinent to its role as a regulatory agency. As used here, docketed does not refer to Court dockets; it refers to the system by which NRC maintains its regulatory records. This series of documents is indexed by a Personal Author Index, a Corporate Source Index, and a Report Number Index. The docketed information contained in the Title List includes the information formerly issued through the Department of Energy publication Power Reactor Docket Information, last published in January 1979. Microfiche of the docketed information listed in the Title List is available for sale on a subscription basis from the National Technical Information Service (NTIS). See NOTES at the end of the Preface for the complete NTIS address. We encourage your comments, criticisms, and suggestions. In particular, if there are title descriptions that are not meaningful, please let us know so that we can correct the data base. Insofar as possible, we would like this document to be a valuable part of your reference material.

Not Available

1990-04-01T23:59:59.000Z

499

Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program  

SciTech Connect (OSTI)

Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

Goldstein, D.R.; Cressman, A.W.

1999-07-01T23:59:59.000Z

500

Title of paper: Grant-Writing Resources: Supporting Women Faculty in STEM through Author: Elizabeth A. Burroughs  

E-Print Network [OSTI]

Title of paper: Grant-Writing Resources: Supporting Women Faculty in STEM through Mentoring. Author: Elizabeth A. Burroughs Abstract: Montana State University is a large land grant institution in the Rocky overall, MSU has room to grow the numbers of women faculty. Supported by an NSF ADVANCE program grant, we

Dyer, Bill