National Library of Energy BETA

Sample records for title recovery act

  1. Recovery Act

    Broader source: Energy.gov [DOE]

    Recovery Act and Energy Department programs were designed to stimulate the economy while creating new power sources, conserving resources and aligning the nation to once again lead the global energy economy.

  2. Recovery Act Milestones

    ScienceCinema (OSTI)

    Rogers, Matt

    2013-05-29

    Every 100 days, the Department of Energy is held accountable for a progress report on the American Recovery and Reinvestment Act. Update at 200 days, hosted by Matt Rogers, Senior Advisor to Secretary Steven Chu for Recovery Act Implementation.

  3. ARM - Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecovery Act Recovery Act Logo Subscribe FAQs Recovery Act

  4. Recovery Act State Memos Virginia

    Energy Savers [EERE]

    * VIRGINIA RECOVERY ACT SNAPSHOT Virginia has substantial natural resources, including coal and natural gas. The American Recovery & Reinvestment Act (ARRA) is making a...

  5. New York Recovery Act Snapshot

    Broader source: Energy.gov [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation's energy and environmental future. The Recovery Act investments in New York are supporting a...

  6. ARM - Recovery Act Instruments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Comments?govInstrumentsnoaacrnBarrow, Alaska OutreachCalendarPress Releases Related2ActRecovery Act Instruments

  7. Recovery Act Workforce Development | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announces Nearly 100 Million for Smart Grid Workforce Training and Development. Congressional Testimony Recovery Act Recovery Act Interoperability Recovery Act SGIG...

  8. Biomass Program Recovery Act Factsheet

    SciTech Connect (OSTI)

    2010-03-01

    The Biomass Program has awarded about $718 million in American Recovery and Reinvestment Act (Recovery Act) funds. The projects the Program is supporting are intended to: Accelerate advanced biofuels research, development, and demonstration; Speed the deployment and commercialization of advanced biofuels and bioproducts; Further the U.S. bioindustry through market transformation and creating or saving a range of jobs.

  9. Wyoming Recovery Act State Memo

    Broader source: Energy.gov [DOE]

    Wyoming has substantial natural resources including coal, natural gas, oil, and wind power. The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation’s...

  10. Wisconsin Recovery Act State Memo

    Office of Energy Efficiency and Renewable Energy (EERE)

    Wisconsin has substantial natural resources, including biomass and hydroelectric power. The American Recovery & Reinvestment Act (ARRA)is making a meaningful down payment on the nation’s energy...

  11. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data CenterFinancialInvesting inServicesRecovery Act » Recovery Act

  12. Recovery Act milestone: Excavation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * Impacts onReal-TimeRecord-SettingAct Workforcemilestone:

  13. American Recovery and Reinvestment Act Accelerated Milestones

    Office of Environmental Management (EM)

    RECOVERY PROJECT OR ACTIVITY ACCELERATED MILESTONE TITLE MILESTONE DUE DATE EXPECTED ACCELERATED COMPLETION DATE WITH ARRA FUNDING STATUS INL - Cleanup of Surplus Nuclear...

  14. District of Columbia Recovery Act State Memo

    Broader source: Energy.gov [DOE]

    The American Recovery & Reinvestment Act (ARRA) is making a meaningful down payment on the nation’s energy and environmental future. The Recovery Act investments in the District of Columbia...

  15. Recovery Act State Memos Tennessee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject Developsfor UCNIEnvironmental Impact StatementRecovery Act Smart

  16. Recovery Act State Memos California

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI | Department8Recovery ActCalifornia For

  17. Recovery Act Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a grant from the Department of Energy's Smart Grid Investment Grant (SGIG) Program. More Congressional Testimony Recovery Act Recovery Act Interoperability Recovery Act SGIG...

  18. Connecticut Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecticut Recovery Act State Memo Connecticut Recovery Act State Memo The American Recovery & Reinvestment Act (ARRA) is making a meaningful downpayment on the nation's energy...

  19. Recovery Act State Memos Nevada

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI | Department8Recovery ActCalifornia ForNevada

  20. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugustPastRecovery Act

  1. Microsoft Word - Attachment 3 Recovery Act notification | Department...

    Energy Savers [EERE]

    Microsoft Word - Attachment 3 Recovery Act notification Microsoft Word - Attachment 3 Recovery Act notification More Documents & Publications Microsoft Word - Attachment 3 Recovery...

  2. Know Your Rights Under the Recovery Act!

    E-Print Network [OSTI]

    Rock, Chris

    by the employee to the Recovery Accountability and Transparency Board, an Inspector General, the Comptroller General, a member of Congress, a state or federal regulatory or law enforcement agency, a person rights and details on how to report at www.recovery.gov. 1 Section 1553 of Division A, Title XV

  3. Recovery Act Progress Update: Reactor Closure Feature

    SciTech Connect (OSTI)

    Cody, Tom

    2010-01-01

    A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

  4. Faces of the Recovery Act: 1366 Technologies

    Broader source: Energy.gov [DOE]

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production.

  5. Faces of the Recovery Act: Sun Catalytix

    Broader source: Energy.gov [DOE]

    At the Massachusetts Institute of Technology, Dan Nocera talks about Sun Catalytix, the next generation of solar energy, and ARPA-E funding through the Recovery Act.

  6. Recovery Act Progress Update: Reactor Closure Feature

    ScienceCinema (OSTI)

    Cody, Tom

    2012-06-14

    A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

  7. Faces of the Recovery Act: Sun Catalytix

    ScienceCinema (OSTI)

    Nocera, Dave

    2013-05-29

    BOSTON- At the Massachusetts Institute of Technology, Dan Nocera talks about Sun Catalytix, the next generation of solar energy, and ARPA-E funding through the Recovery Act. To learn about more ARPA-E projects through the Recovery Act: http://arpa-e.energy.gov/FundedProjects.aspx

  8. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul

    2013-02-28

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  9. The Economic Recovery Tax Act of 1981. 

    E-Print Network [OSTI]

    Pena, Jose G.; Lovell, Ashley C.; Kensing, Robert H.

    1983-01-01

    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Considerations for Estate Planning under ERTA ............................................... 8 2 The Economic Recovery Tax Act of 1981 Jose G. Pena, Ashley C. Lovell and Robert H. Kensing* Major changes in the gift and estate tax laws were...

  10. American Recovery and Reinvestment Act of 2009: Biomass Program Investments

    SciTech Connect (OSTI)

    2012-06-01

    This fact sheet discusses the Biomass Program's investments using Recovery Act funding, as well as make note of how Recovery Act projects are currently doing.

  11. Recovery Act Selections for Smart Grid Invesment Grant Awards...

    Energy Savers [EERE]

    Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category Updated July 2010 Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category Updated July...

  12. Recovery Act Selections for Smart Grid Investment Grant Awards...

    Energy Savers [EERE]

    Recovery Act Selections for Smart Grid Investment Grant Awards- By Category Updated July 2010 Recovery Act Selections for Smart Grid Investment Grant Awards- By Category Updated...

  13. President Obama Announces Over $467 Million in Recovery Act Funding...

    Energy Savers [EERE]

    President Obama Announces Over 467 Million in Recovery Act Funding for Geothermal and Solar Energy Projects President Obama Announces Over 467 Million in Recovery Act Funding for...

  14. President Obama Announces Over $467 Million in Recovery Act Funding...

    Energy Savers [EERE]

    Over 467 Million in Recovery Act Funding for Geothermal and Solar Energy Projects President Obama Announces Over 467 Million in Recovery Act Funding for Geothermal and Solar...

  15. Study Shows Significant Economic Impact from Recovery Act | Department...

    Office of Environmental Management (EM)

    Study Shows Significant Economic Impact from Recovery Act Study Shows Significant Economic Impact from Recovery Act A study recently released shows the 1.6 billion the Savannah...

  16. Recovery Act: Clean Coal Power Initiative | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    A report detailling the Clean Coal Power initiative funded under the American Recovery and Renewal Act of 2009. Recovery Act: Clean Coal Power Initiative More Documents &...

  17. Faces of the Recovery Act: 1366 Technologies

    SciTech Connect (OSTI)

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2010-01-01

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  18. Faces of the Recovery Act: 1366 Technologies

    ScienceCinema (OSTI)

    Sachs, Ely; Mierlo, Frank van; Obama, Barack

    2013-05-29

    LEXINGTON, MA - At 1366 Technologies, Ely Sachs and Frank van Mierlo are using ARPA-E Recovery Act funding to dramatically reduce the costs of solar panel production. To read more about the project: http://arpa-e.energy.gov/FundedProjects.aspx#1366 To see more projects funded by the Recovery Act through ARPA-E: http://arpa-e.energy.gov/FundedProjects.aspx

  19. Recovery Act Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data CenterFinancialInvesting inServicesRecovery Act » Recovery Act Reports

  20. Title 10 CFR 1021 National Environmental Policy Act Implementing...

    Open Energy Info (EERE)

    Title 10 CFR 1021 National Environmental Policy Act Implementing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal...

  1. American Recovery and Reinvestment Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L O O D S TAPropaneand Los Alamos NationalAmerican Recovery

  2. Recovery Act Recipient Data | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecoveryRecovery Act

  3. Recovery Act Weekly Video: 200 West Drilling

    ScienceCinema (OSTI)

    None

    2012-06-14

    President of Cascade Drilling, Bruce, talks about his contract with the Department of Energy and what his team is doing to improve water treatment and environmental cleanup. The small business owner hits on how the Recovery Act saved him from downsizing and helped him stay competitive and safe on site.

  4. Steelmaker Matches Recovery Act Funds to Save Energy & Reduce...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reduce Steel Production Costs ArcelorMittal Indiana Harbor Energy Recovery & Reuse 504 Boiler constructed and installed with DOE Recovery Act Funding The Advanced Manufacturing...

  5. Steelmaker Matches Recovery Act Funds to Save Energy & Reduce...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    factsheet describing how ArcelorMittal Indiana Harbor Energy Recovery & Reuse 504 Boiler was constructed and installed with DOE Recovery Act Funding. Blast Furnace Gas...

  6. Treasury, Energy Announce More Than $3 Billion in Recovery Act...

    Energy Savers [EERE]

    More Than 3 Billion in Recovery Act Funds for Renewable Energy Projects Treasury, Energy Announce More Than 3 Billion in Recovery Act Funds for Renewable Energy Projects July 9,...

  7. Economic Impact of Recovery Act Investments in the Smart Grid...

    Energy Savers [EERE]

    Economic Impact of Recovery Act Investments in the Smart Grid Report Now Available Economic Impact of Recovery Act Investments in the Smart Grid Report Now Available April 25, 2013...

  8. Recovery Act Workers Accomplish Cleanup of Second Cold War Coal...

    Office of Environmental Management (EM)

    June 21, 2011 Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin AIKEN, S.C. - American Recovery and Reinvestment Act workers re- cently cleaned up a second...

  9. WIPP Uses Recovery Act Funding to Reduce Nuclear Waste Footprint...

    Office of Environmental Management (EM)

    WIPP Uses Recovery Act Funding to Reduce Nuclear Waste Footprint WIPP Uses Recovery Act Funding to Reduce Nuclear Waste Footprint August 1, 2011 - 12:00pm Addthis Media Contact Deb...

  10. California Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act State Memo California Recovery Act State Memo California has substantial natural resources, including oil, gas, solar, wind, geothermal, and hydroelectric power. The...

  11. Recovery Act: Demonstrating The Commercial Feasibility Of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject Developsfor UCNIEnvironmental Impact StatementRecovery ActDepartment

  12. 200,000 homes weatherized under the Recovery Act

    Broader source: Energy.gov [DOE]

    Today Vice President Biden announced that the Weatherization Assistance Program has weatherized 200,000 homes under the Recovery Act.

  13. RECOVERY ACT: Geologic Sequestration Training and Research

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnical Report:Speeding accessby aLEDSpeeding FINAL Progress Report ProjectRECOVERY ACT:

  14. Laboratory awards final Recovery Act demolition contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate studentScience (SC)Planning ProcessRecovery Act

  15. National Weatherization Assistance Program Characterization Describing the Recovery Act Period

    SciTech Connect (OSTI)

    Tonn, Bruce Edward; Rose, Erin M.; Hawkins, Beth A.

    2015-10-01

    This report characterizes the U.S. Department of Energy s Weatherization Assistance Program (WAP) during the American Recovery and Reinvestment Act of 2009 (Recovery Act) period. This research was one component of the Recovery Act evaluation of WAP. The report presents the results of surveys administered to Grantees (i.e., state weatherization offices) and Subgrantees (i.e., local weatherization agencies). The report also documents the ramp up and ramp down of weatherization production and direct employment during the Recovery Act period and other challenges faced by the Grantees and Subgrantees during this period. Program operations during the Recovery Act (Program Year 2010) are compared to operations during the year previous to the Recovery Act (Program Year 2008).

  16. 73-20-1. Short title. This act may be cited as the "Watershed District Act".

    E-Print Network [OSTI]

    Johnson, Eric E.

    District Act [73-20-1 NMSA 1978] is to secure the federal assistance provided in Public Law 566 of the 83rd73-20-1. Short title. This act may be cited as the "Watershed District Act". History: 1953 Comp., § 45-5-19, enacted by Laws 1957, ch. 210, § 1. Cross references. -- For provisions of the Water Project

  17. Recovery Act Funds at Work: Smart Grid Investment Grant Profiles...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the country, visit OE's Recovery Act page. Additional information is available on SmartGrid.gov, including impact metrics, tracking data, and specifics on all projects. Case...

  18. Federal Energy Management Program Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  19. Recovery Act ? An Interdisciplinary Program for Education and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program for Education and Outreach in Transportation Electrification Recovery ActTransportation Electrification Education Partnership for Green Jobs and Sustainable Mobility...

  20. Idaho Operations Office: American Recovery and Reinvestment Act Update

    ScienceCinema (OSTI)

    Provencher, Rick

    2012-06-14

    An update from Idaho National Laboratory, Rick Provencher addresses the progress that has been made due to the American Recovery and Reinvestment Act.

  1. Treasury, Energy Surpass $1 Billion Milestone in Recovery Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    than 1 billion awarded to date to companies committed to investing in domestic renewable energy production. "This Recovery Act program is an example of a true federal partnership...

  2. American Recovery and Reinvestment Act of 2009 | Department of...

    Office of Environmental Management (EM)

    More Documents & Publications This taskcontract modification is for applying funding from the American Recovery Reinvestment Act FY 2008 & FY 2009 Annual Uncosted Balances Report...

  3. Recovery Act Project Clears Portsmouth Switchyard, Benefits Community through Recycling

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act workers recently completed the demolition of structures in an electrical switchyard used to help power the Portsmouth Site's uranium enrichment processes for...

  4. RECOVERY ACT -- CLEAN ENERGY COALITION MICHIGAN GREEN FLEETS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ann Arbor, Michigan: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) RECOVERY ACT -- CLEAN ENERGY COALITION MICHIGAN GREEN FLEETS...

  5. Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility

    Broader source: Energy.gov [DOE]

    Construction of the largest groundwater treatment facility at the Hanford Site – a major American Recovery and Reinvestment Act project – is on schedule and more than 70 percent...

  6. American Recovery and Reinvestment Act of 2009: Bioenergy Technologies...

    Broader source: Energy.gov (indexed) [DOE]

    The Bioenergy Technologies Office rewarded about 178 million in American Recovery and Reinvestment Act of 2009 funds; the projects accelerate advanced biofuels RD&D, speed the...

  7. Recovery Act Investment Moves EM Past Milestone of 100 Project...

    Office of Environmental Management (EM)

    achievement: completion of more than 100 projects in its 6 billion cleanup of the Manhattan Project and Cold War legacy. Recovery Act Investment Moves EM Past Milestone of...

  8. Celebrating Successes of Environmental Management Recovery Act Projects

    Broader source: Energy.gov [DOE]

    The Office of Environmental Management marked a milestone at the end of last month as they completed 84 American Recovery and Reinvestment Act-funded projects across America.

  9. Department of Energy Recovery Act Investment in Biomass Technologies

    SciTech Connect (OSTI)

    2010-11-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) provided more than $36 billion to the Department of Energy (DOE) to accelerate work on existing projects, undertake new and transformative research, and deploy clean energy technologies across the nation. Of this funding, $1029 million is supporting innovative work to advance biomass research, development, demonstration, and deployment.

  10. Estuary Restoration Act of 2000 Title I of Estuaries and Clean Waters Act of 2000

    E-Print Network [OSTI]

    US Army Corps of Engineers

    information. The U.S. Army Corps of Engineers received project funding totaling $ 3,974,000 for fiscal years of Section 108 of the Estuary Restoration Act, Title I of P.L. 106-457 (Act). This report covers the fiscal Register, Vol. 67, No. 232). Funds were authorized to be appropriated to the Army for fiscal years 2001

  11. NASA ACTS SATELLITE: A DISASTER RECOVERY TEST Dr. Hans Kruse

    E-Print Network [OSTI]

    Kruse, Hans

    NASA ACTS SATELLITE: A DISASTER RECOVERY TEST Dr. Hans Kruse School of Communications Systems In September 1993, NASA launched its long- awaited Advanced Communication Technology (ACTS) satellite. ACTS and opening of the Ka frequency band. Among the earliest of the tests on the new satellite was a NASA

  12. Highlights from U.S. Department of Energy's Fuel Cell Recovery Act Projects

    SciTech Connect (OSTI)

    Fuel Cell Technologies Office

    2012-05-01

    This fact sheets highlights U.S. Department of Energy fuel cell projects funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act). More than 1,000 fuel cell systems have been deployed through Recovery Act funding.

  13. Steelmaker Matches Recovery Act Funds to Save Energy & Reduce Steel Production Costs

    Broader source: Energy.gov [DOE]

    ArcelorMittal Indiana Harbor Energy Recovery & Reuse 504 Boiler constructed and installed with DOE Recovery Act Funding

  14. Faces of the Recovery Act: Johnson Controls Inc.

    SciTech Connect (OSTI)

    Rolinski, Elizabeth

    2010-01-01

    Thanks in part to a $300 million grant through the Recovery Act, Johnson Controls is re-opening a plant that is now being retrofitted to produce batteries that will power tomorrow's electric cars.

  15. Faces of the Recovery Act: Johnson Controls Inc.

    Broader source: Energy.gov [DOE]

    Thanks in part to a $300 million grant through the Recovery Act, Johnson Controls is re-opening a plant in Holland, Michigan that is now being retrofitted to produce batteries that will power...

  16. Faces of the Recovery Act: Jobs at Savannah River Site

    ScienceCinema (OSTI)

    Skila Harris

    2010-09-01

    The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires.

  17. Faces of the Recovery Act: The Impact of Smart Grid

    Broader source: Energy.gov [DOE]

    On October 27th, 2009, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with...

  18. Recovery Act Workers Clear Reactor Shields from Brookhaven Lab

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act workers are in the final stage of decommissioning a nuclear reactor after they recently removed thick steel shields once used to absorb neutrons produced for...

  19. Smart Grid Data from the American Recovery and Reinvestment Act...

    Open Energy Info (EERE)

    Smart Grid Data from the American Recovery and Reinvestment Act (ARRA) Projects The data provided in this Excel spreadsheet is the final data that was collected through the Smart...

  20. American Recovery and Reinvestment Act of 2009 CSP Awards

    Broader source: Energy.gov [DOE]

    In 2009, DOE announced six concentrating solar power (CSP) projects funded under the American Recovery and Reinvestment Act (ARRA) of 2009. The following projects were selected under this competitive solicitation, managed by the SunShot Initiative.

  1. Progress Continues Post-Recovery Act Award at Hanford Site

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act work at the Hanford site continues with several projects intended to reduce the Cold War cleanup footprint, from decommissioning a plant once associated with...

  2. American Recovery and Reinvestment Act of 2009 & NEPA

    Broader source: Energy.gov [DOE]

    Section 1609(c) requires a report to Congress on the status and progress of NEPA reviews for Recovery Act funded projects and activities. The President has assigned reporting responsibility to CEQ

  3. Two Recovery Act Funding Case Studies Now Available

    Broader source: Energy.gov [DOE]

    Utilities across America are using Recovery Act funds and smart grid technologies to deliver more reliable and affordable power, recover from major storms, and improve operations. Two case studies are now available.

  4. Recovery Act's HWCTR Project Empty of Equipment, Ready for Grouting...

    Office of Environmental Management (EM)

    Recovery and Reinvestment Act Project Progress The liner installer heat-welds a sand anchor closed. The sand anchors are installed under the liner and across the length of...

  5. Faces of the Recovery Act: Johnson Controls Inc.

    ScienceCinema (OSTI)

    Rolinski, Elizabeth

    2013-05-29

    Thanks in part to a $300 million grant through the Recovery Act, Johnson Controls is re-opening a plant that is now being retrofitted to produce batteries that will power tomorrow's electric cars.

  6. Faces of the Recovery Act: Jobs at Savannah River Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires.

  7. Recovery Act-Funded Geothermal Heat Pump projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) was allocated funding from the American Recovery and Reinvestment Act to conduct research into ground source heat pump technologies and applications. Projects...

  8. Faces of the Recovery Act: Jobs at Savannah River Site

    ScienceCinema (OSTI)

    Clark, Doug; Picciano, Bill; Culpepper, Kelli; Cole, Nancy; Oliver, Rahmel;

    2013-05-29

    The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires.

  9. Recovery Act Monthly Reporting Spreadsheet | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery ActRecovery Act

  10. Title III list of lists: Consolidated list of chemicals subject to the Emergency Planning and Community Right-to-Know Act (EPCRA) and section 112(r) of the Clean Air Act, as ammended. Title III of the Superfund Amendments and Reauthorization Act of 1986, and Title III of the Clean Air Act Amendments of 1990, April 1995

    SciTech Connect (OSTI)

    NONE

    1995-04-01

    This consolidated list has been prepared to help firms handling chemicals determine whether they need to submit reports under sections 302, 304, or 313 of SARA Title III (EPCRA) and, for a specific chemical, what reports may need to be submitted. It will also help firms determine whether they will be subject to accident prevention regulations under CAA section 112(r). Separate lists are also provided of Resource Conservation and Recovery Act (RCRA) waste streams and unlisted hazardous wastes, and of radionuclides reportable under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). These lists should be used as a reference tool, not as a definitive source of compliance information.

  11. Title III list of lists: Consolidated list of chemicals subject to the Emergency Planning and Community Right-to-Know Act (EPCRA) and section 112(r) of the Clean Air Act, as amended. Title III of the Superfund Amendments and Reauthorization Act of 1986, and Title III of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The consolidated chemical list includes chemicals subject to reporting requirements under Title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA), also known as the Emergency Planning and Community Right-to-Know Act (EPCRA), and chemicals listed under section 112(r) of Title III the Clean Air Act (CAA) Amendments of 1990. This consolidated list has been prepared to help firms handling chemicals determine whether they need to submit reports under sections 302, 304, or 313 of SARA Title III (EPCRA) and, for a specific chemical, what reports may need to be submitted. Separate lists are also provided of Resource Conservation and Recovery Act (RCRA) waste streams and unlisted hazardous wastes, and of radionuclides reportable under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). These lists should be used as reference tool, not as a definitive source of compliance information. The chemicals on the consolidated list are ordered by Chemical Abstract Service (CAS) registry number. Categories of chemicals, which do not have CAS registry numbers, but which are cited under CERCLA, EPCRA section 313, and the CAA, are placed at the end of the list. More than one chemical name may be listed for one CAS number, because the same chemical may appear on different lists under different names.

  12. Recovery Act Recipient Data | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: JuliaDepartment-8-2008RSSa WebcastA listing of all Recovery

  13. Recovery Act milestone: Excavation begins at Manhattan Project landfill

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-RichProtonAbout Us Hanford SiteRecovery Act » RecoveryRecovery

  14. Recovery Act | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-RichProtonAbout Us Hanford SiteRecovery Act »Recovery Act News

  15. ARM - ARM Recovery Act Project FAQs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.TheoryTuesday, August 10, 20102016 NewsUsers'Organization andYear RelatedActARM

  16. recovery act | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowa (UtilityMichigan)data book Homefuelleasingoutagesrecovery act Home

  17. LANL sponsors Recovery Act Job Fair

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource and Job Event InLANLRecovery Act Job Fair October

  18. FAQs Related to the Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program ManagementAct FAQs Related to the Recovery Act

  19. an Recovery and Reinvestment Act of 20091 (Recovery Act) provides protections for cert

    E-Print Network [OSTI]

    Tam, Tin-Yau

    ors, subcontractors, grantees, or professional membership organizations acting in the interest ry Act vernmen ctors, sububbbbbcoonttraactctorors,s,s,s,s grantees, or proofofofofofesesesessisisis

  20. Faces of the Recovery Act: The Impact of Smart Grid

    SciTech Connect (OSTI)

    President Obama

    2009-11-24

    On October 27th, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with President Obama, explain how building a smarter grid will help consumers cut their utility bills, battle climate change and create jobs.

  1. Recovery Act Energy Jobs Bring New Era of Opportunity

    Broader source: Energy.gov [DOE]

    Hundreds of thousands of people found work in the past few years thanks to Recovery Act and Energy Department programs designed to stimulate the economy while creating new power sources, conserving resources and aligning the nation to once again lead the global energy economy.

  2. The Recovery Act: Cutting Costs and Upping Capacity

    Broader source: Energy.gov [DOE]

    Secretary Chu joined Vice President Joe Biden at the White House to help unveil a new report on how investments made through the Recovery Act have been impacting innovation. While the report analyzed several major sectors, its most striking findings centered on energy.

  3. Recovery Act Weekly Video: Upper ALE Building Demolition

    ScienceCinema (OSTI)

    None

    2012-06-14

    CH2MHILL Plateau Remediation Company demolition of 6652C Space Science Laboratory. The largest building atop Rattlesnake Mountain, the laboratory served as a nightly radar patrol center as well as a barracks. The Recovery Act funded project is helping reduce the site footprint.

  4. Faces of the Recovery Act: The Impact of Smart Grid

    ScienceCinema (OSTI)

    President Obama

    2010-09-01

    On October 27th, Baltimore Gas & Electric was selected to receive $200 million for Smart Grid innovation projects under the Recovery Act. Watch as members of their team, along with President Obama, explain how building a smarter grid will help consumers cut their utility bills, battle climate change and create jobs.

  5. 200,000 homes weatherized under the Recovery Act

    ScienceCinema (OSTI)

    Zoi, Cathy

    2013-05-29

    Today Vice President Biden announced that the Weatherization Assistance Program has weatherized 200,000 homes under the Recovery Act. We're taking your questions and comments right now on weatherization. Join in the conversation! *Facebook -- http://www.facebook.com/energygov *Twitter -- http://www.twitter.com/energy

  6. Recovery Act Begins Box Remediation Operations at F Canyon

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The F Canyon box remediation program, an American Recovery and Reinvestment Act project at Savannah River Site (SRS), has come online to process legacy transuranic (TRU) waste for off-site shipment and permanent disposal at the Waste Isolation Pilot Plant (WIPP), a geological repository in New Mexico.

  7. Optimizing electric utility air toxics compliance with other titles of the Clean Air Act

    SciTech Connect (OSTI)

    Loeb, A.P.; South, D.W.

    1993-12-31

    This paper provides an overview of regulatory issues under Title III of the Clean Air Act Amendments that could affect electric utilities. Title III contains provisions relating to hazardous air pollutants (HAPs) and provides special treatment for electric utilities. Generally, this discussion documents that if utility toxic emissions are regulated, one of the chief difficulties confronting utilities will be the lack of coordination between Title III and other titles of the Act. The paper concludes that if the US Environmental Protection Agency (EPA) determines that regulation of utility HAPs is warranted under Title III, savings can be realized from flexible compliance treatment.

  8. Recovery Act update from Sr. Advisor Matt Rogers -- End of Obligations

    ScienceCinema (OSTI)

    Rogers, Matt

    2013-05-29

    Senior Advisor to the Secretary for Recovery Act Implementation Matt Rogers shares his thoughts as the Recovery Act reaches a critical milestone -- the end of the 2010 fiscal year and the last day to obligation contract and grant funding under the Recovery Act. For more information about the Recovery Act at the Department of Energy: http://www.energy.gov/recovery Follow the Department of Energy! http://facebook.com/energygov http://twitter.com/energy

  9. AL 2015-04- Implementation of Division D, Title III and Title V, and Division E, Title Title VII of the Consolidated and Further Continuing Appropriations Act, 2015, Pub. L. No.113-235

    Broader source: Energy.gov [DOE]

    The purpose of this AL is to provide information and guidance regarding the Department of Energy’s (DOE or Department) implementation of Division D, Title III and Title V, and Division E, Title VII of the Consolidated and Further Continuing Appropriations Act, 2015, Pub. L. No. 113-235 (2015 Act). The Congressional notification requirements of the Act will be addressed in a separate Acquisition Letter/Financial Assistance Letter.

  10. The Recovery Act is "Lighting Up" the streets of Philadelphia

    ScienceCinema (OSTI)

    Nutter, Michael; Gajewski, Katherine; Russell, Toby; Williams, Doug; Best, DeLain;

    2013-05-29

    The Philadelphia Streets Department is converting 58,000 yellow and green traffic signals and will replace approximately 27,000 red LED lights that have come to the end of their useful life. The project will use approximately $3 million in EECBG funds, matched with $3 million in PECO funding, and will save the city approximately $1 million in electric costs each year. For more information on Recovery Act projects funded by the Department of Energy in Pennsylvania: http://www.energy.gov/recovery/pa.htm

  11. The Recovery Act is "Lighting Up" the streets of Philadelphia

    SciTech Connect (OSTI)

    Nutter, Michael; Gajewski, Katherine; Russell, Toby; Williams, Doug; Best, DeLain;

    2010-01-01

    The Philadelphia Streets Department is converting 58,000 yellow and green traffic signals and will replace approximately 27,000 red LED lights that have come to the end of their useful life. The project will use approximately $3 million in EECBG funds, matched with $3 million in PECO funding, and will save the city approximately $1 million in electric costs each year. For more information on Recovery Act projects funded by the Department of Energy in Pennsylvania: http://www.energy.gov/recovery/pa.htm

  12. Recovery Act funds advance cleanup efforts at Cold War site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-RichProtonAbout Us Hanford SiteRecovery Act » Recovery

  13. Highlights from U.S. Department of Energy's Fuel Cell Recovery Act Projects

    Fuel Cell Technologies Publication and Product Library (EERE)

    This fact sheets highlights U.S. Department of Energy fuel cell projects funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act). More than 1,000 fuel cell systems have been deploy

  14. Recovery Act update from Sr. Advisor Matt Rogers-- End of Obligations

    Broader source: Energy.gov [DOE]

    Matt Rogers, Senior Advisor to the Secretary for Recovery Act Implementation, shares his thoughts as the Recovery Act reaches a critical milestone -- the end of the 2010 fiscal year and the last...

  15. American Recovery and Reinvestment Act of 2009 and NEPA: CEQ Reports to Congress

    Broader source: Energy.gov [DOE]

    Section 1609(c) of the American Recovery and Reinvestment Act of 2009 (ARRA) requires a report to Congress on the status and progress of NEPA reviews for Recovery Act funded projects and activities...

  16. Early-Stage Market Change and Effects of the Recovery Act Fuel...

    Energy Savers [EERE]

    Early-Stage Market Change and Effects of the Recovery Act Fuel Cell Program Early-Stage Market Change and Effects of the Recovery Act Fuel Cell Program On April 15, 2009, the U.S....

  17. Early Stage Market Change and Effects of the Recovery Act Fuel...

    Energy Savers [EERE]

    Early Stage Market Change and Effects of the Recovery Act Fuel Cell Program -- 2015 Update Early Stage Market Change and Effects of the Recovery Act Fuel Cell Program -- 2015...

  18. Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery Act Helps

  19. Recovery Act Local Energy Assurance Planning (LEAP) Initiative Funding

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery Act

  20. Resource Conservation and Recovery Act (RCRA) facility assessment guidance

    SciTech Connect (OSTI)

    Rastatter, C.; Fagan, D.; Foss, D.

    1986-10-01

    Facilities that manage hazardous wastes are required to obtain permits under the Resource Conservation and Recovery Act (RCRA) of 1976. This guidance document informs RCRA permit writers and enforcement officials of procedures to be used in conducting RCRA Facility Assessments. The RCRA corrective-action program was established to investigate and require clean up of releases of hazardous wastes or constituents to the environment at facilities subject to RCRA permits. Releases to ground water, surface water, air, soil, and subsurface strata may be addressed.

  1. Nevada Recovery Act State Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool Fits the BillDepartmentSites KDFNationalNavy 1 Geothermal AreaNevada Recovery Act

  2. Overview of Recovery Act FAR Clauses | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills andOrder 422.1, CONDUCT OFER-B-00-020Overview of Recovery Act FAR

  3. Subcontractors complete recovery act-funded demolition under budget

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect PhotovoltaicsStructure andChallenge |StudyingRecovery act-funded demolition

  4. Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing

    SciTech Connect (OSTI)

    Fletcher, James H.; Cox, Philip; Harrington, William J; Campbell, Joseph L

    2013-09-03

    ABSTRACT Project Title: Recovery Act: Advanced Direct Methanol Fuel Cell for Mobile Computing PROJECT OBJECTIVE The objective of the project was to advance portable fuel cell system technology towards the commercial targets of power density, energy density and lifetime. These targets were laid out in the DOE’s R&D roadmap to develop an advanced direct methanol fuel cell power supply that meets commercial entry requirements. Such a power supply will enable mobile computers to operate non-stop, unplugged from the wall power outlet, by using the high energy density of methanol fuel contained in a replaceable fuel cartridge. Specifically this project focused on balance-of-plant component integration and miniaturization, as well as extensive component, subassembly and integrated system durability and validation testing. This design has resulted in a pre-production power supply design and a prototype that meet the rigorous demands of consumer electronic applications. PROJECT TASKS The proposed work plan was designed to meet the project objectives, which corresponded directly with the objectives outlined in the Funding Opportunity Announcement: To engineer the fuel cell balance-of-plant and packaging to meet the needs of consumer electronic systems, specifically at power levels required for mobile computing. UNF used existing balance-of-plant component technologies developed under its current US Army CERDEC project, as well as a previous DOE project completed by PolyFuel, to further refine them to both miniaturize and integrate their functionality to increase the system power density and energy density. Benefits of UNF’s novel passive water recycling MEA (membrane electrode assembly) and the simplified system architecture it enabled formed the foundation of the design approach. The package design was hardened to address orientation independence, shock, vibration, and environmental requirements. Fuel cartridge and fuel subsystems were improved to ensure effective fuel containment. PROJECT OVERVIEW The University of North Florida (UNF), with project partner the University of Florida, recently completed the Department of Energy (DOE) project entitled “Advanced Direct Methanol Fuel Cell for Mobile Computing”. The primary objective of the project was to advance portable fuel cell system technology towards the commercial targets as laid out in the DOE R&D roadmap by developing a 20-watt, direct methanol fuel cell (DMFC), portable power supply based on the UNF innovative “passive water recovery” MEA. Extensive component, sub-system, and system development and testing was undertaken to meet the rigorous demands of the consumer electronic application. Numerous brassboard (nonpackaged) systems were developed to optimize the integration process and facilitating control algorithm development. The culmination of the development effort was a fully-integrated, DMFC, power supply (referred to as DP4). The project goals were 40 W/kg for specific power, 55 W/l for power density, and 575 Whr/l for energy density. It should be noted that the specific power and power density were for the power section only, and did not include the hybrid battery. The energy density is based on three, 200 ml, fuel cartridges, and also did not include the hybrid battery. The results show that the DP4 system configured without the methanol concentration sensor exceeded all performance goals, achieving 41.5 W/kg for specific power, 55.3 W/l for power density, and 623 Whr/l for energy density. During the project, the DOE revised its technical targets, and the definition of many of these targets, for the portable power application. With this revision, specific power, power density, specific energy (Whr/kg), and energy density are based on the total system, including fuel tank, fuel, and hybridization battery. Fuel capacity is not defined, but the same value is required for all calculations. Test data showed that the DP4 exceeded all 2011 Technical Status values; for example, the DP4 energy density was 373 Whr/l versus the DOE 2011 status of 200 Whr/l. For the

  5. AVTA: ChargePoint America Recovery Act Charging Infrastructure Reports

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports describe results of data collected through the Chargepoint America project, which deployed 4,600 public and home charging stations throughout the U.S. This research was conducted by Idaho National Laboratory.

  6. Recovery Act Expanding the First Significant U.S. ? Based Manufacturi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Recovery Act Expanding the First Significant U.S. Based Manufacturing EA-1710: Final Environmental Assessment Expanding U.S.-based Lithium-ion Battery Manufacturing...

  7. Recovery Act Expanding the First Significant U.S. ? Based Manufacturi...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Recovery Act Expanding the First Significant U.S. Based Manufacturing Expanding U.S.-based Lithium-ion Battery Manufacturing EA-1710: Final Environmental Assessment...

  8. State Energy Program Formula Grants- American Recovery and Reinvestment Act (ARRA)

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy State Energy Program Formula Grants, funding for the states, energy efficiency and renewable energy, American Recovery and Reinvestment Act of 2009.

  9. Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste – each weighing up to 15 tons – to a facility for...

  10. 240 Jobs Later: The Recovery Act's Impact at the Paducah Site...

    Office of Environmental Management (EM)

    Enrichment Corp. Recovery Act Creates Jobs, Accelerates Cleanup at DOE's Paducah Site UF6 piping deactivation The black inlet hose is attached to a negative air machine that...

  11. ASCR Recovery Act Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Recovery Act Projects Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced...

  12. Weatherization Assistance Program- The American Recovery and Reinvestment Act of 2009

    Broader source: Energy.gov [DOE]

    DOE Weatherization Assistance Program, energy efficiency in low-income homes, eligibility, American Recovery and Reinvestment Act of 2009, State Allocations of Funding

  13. Protecting Recovery Act Cleanup Site During Massive Wildfire

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery NEWS FLASH RECOVERY.GOV U.S. Depar tment of Energy | Office of Environmental Management ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL...

  14. Title: Optimal Design of Thermoelectric Generators for Low Grade Heat Recovery Developed by Dr. HoSung Lee on 12/15/2014

    E-Print Network [OSTI]

    Lee, Ho Sung

    Title: Optimal Design of Thermoelectric Generators for Low Grade Heat Recovery Developed by Dr. Ho- grade waste heat recovery with the present optimal design. We consider low grade heat recovery from

  15. Recovery Act Special Provisions DOE Inter-Contractor UT-B Contracts Div Page 1 of 1

    E-Print Network [OSTI]

    Recovery Act ­ Special Provisions ­ DOE Inter-Contractor UT-B Contracts Div Aug 2010 Page 1 of 1 recovery-special-prov-doe-inter-contractor-ext-aug10.doc RECOVERY ACT SPECIAL PROVISIONS RELATED TO WORK FUNDED UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 DOE INTER-CONTRACTOR PURCHASE (Aug 2010) (a

  16. Weatherization and Intergovernmental Program - The State Energy Program and the American Recovery and Reinvestment Act

    SciTech Connect (OSTI)

    2010-06-01

    To help the nation weather the ongoing economic downturn and meet key energy goals, the State Energy Program (SEP) will invest $3.1 billion from the American Recovery and Reinvestment Act of 2009 (Recovery Act) for additional grants. These grants do not require matching state funds.

  17. The Regional Incidence of a National Greenhouse Gas Emission Limit: Title VII of the American Clean Energy and Security Act

    E-Print Network [OSTI]

    Wing, Ian Sue

    the macroeconomic costs of greenhouse gas emission reductions under Title VII of the American Clean Energy Clean Energy and Security Act Ian Sue Wing* Dept. of Geography & Environment, Boston University. Introduction Title VII of the American Clean Energy and Security Act of 2009 (H.R. 2454) has the distinction

  18. Early-Stage Market Change and Effects of the Recovery Act Fuel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Early-Stage Market Change and Effects of the Recovery Act Fuel Cell Program Submitted to: Lawrence Berkeley National Laboratory Prepared by: EnerSys Innovation, LLC Under contract...

  19. Moab Project Disposes 2 Million Tons of Uranium Mill Tailings with Recovery Act Funds

    Broader source: Energy.gov [DOE]

    The Moab Uranium Mill Tailings Remedial Action Project reached its primary American Recovery and Reinvestment Act milestone ahead of schedule on Wednesday with the disposal of 2 million tons of...

  20. Recovery Act-Funded Study Assesses Contamination at Former Test Site in California

    Broader source: Energy.gov [DOE]

    Workers in a study funded by $38 million from the American Recovery and Reinvestment Act to assess radiological contamination have collected more than 600 soil samples and surveyed 120 acres of...

  1. Recovery Act Funding Leads to Record Year for Transuranic Waste Shipments

    Broader source: Energy.gov [DOE]

    With the help of American Recovery and Reinvestment Act funding, the Waste Isolation Pilot Plant (WIPP) received the most transuranic waste shipments in a single year since waste operations began...

  2. Dual mandates or dueling mandates : federal energy efficiency programs and the Recovery Act

    E-Print Network [OSTI]

    Sklarsky, Joshua (Joshua Lee)

    2010-01-01

    In February 2009, President Barack Obama signed the American Recovery and Reinvestment Act (ARRA) into law, providing billions of dollars in funding for federal energy efficiency programs. ARRA represented different things ...

  3. Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives, Railcars

    Broader source: Energy.gov [DOE]

    With the help of the American Recovery and Reinvestment Act, the Hanford Site is preserving the history of its locomotives and railcars as workers clean up the legacy of the Cold War.

  4. Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

    SciTech Connect (OSTI)

    2010-06-01

    The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances sur

  5. Michigan Recovery Act State Memo | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Act investments in Michigan are supporting abroad range of clean energy projects from battery manufacturing to energy efficiency and the smart grid, renewable energy, and...

  6. President Obama Announces Over $467 Million in Recovery Act Funding...

    Broader source: Energy.gov (indexed) [DOE]

    Act to expand and accelerate the development, deployment, and use of geothermal and solar energy throughout the United States. The funding announced today represents a...

  7. Title III List of Lists: Consolidated list of chemicals subject to the Emergency Planning and Community Right-to-Know Act (EPCRA) and Section 112(r) of the Clean Air Act, as amended. Title III of the Superfund Amendments and Reauthorization Act of 1986, and Title III of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    NONE

    1996-12-01

    This consolidated chemical list includes chemicals subject to reporting requirements under Title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA), also known as the Emergency Planning and Community Right-to-Know Act (EPCRA) and chemicals listed under Section 112(r) of Title III of the Clean Air Act (CAA) Amendments of 1990. This consolidated list has been prepared to help firms handling chemicals determine whether they need to submit reports under sections 302, 304, or 314 or SARA Title III (EPCRA) and, for a specific chemical, what reports may need to be submitted. It also will also help firms determine whether they will be subject to accident prevention regulations under CAA section 112(r).

  8. The economics of pollution permit banking in the context of Title IV of the 1990 Clean Air Act amendments

    E-Print Network [OSTI]

    Schennach, Susanne M.

    1998-01-01

    Tradable pollution permits are the basis of a new market-based approach to environmental control. The Acid Rain Program, established under Title IV of the Clean Air Act Amendments of 1990, and aimed at drastically reducing ...

  9. "TRU" Success: SRS Recovery Act Prepares to Complete Shipment...

    Broader source: Energy.gov (indexed) [DOE]

    Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP More Documents & Publications TRUPACT-III Quick Facts EIS-0026-SA-06: Supplement...

  10. Interaction between Titles 2 and 3 of the Clean Air Act as amended, 1990

    SciTech Connect (OSTI)

    Szpunar, C.B.

    1996-02-01

    This report examines Some issues that would I affect the refining industry if the requirements for hazardous air pollutants set out in Title III of the Clean Air Act Amendments were to impede the market entrance of oxygenated fuels, as me; required by Title II. It describes the mandate for reformulated gasoline; considers gasoline characteristics in light of component shifts in refining; examines the supply of, demand for, and cost of various feedstocks and blendstocks; and identifies the emissions and atmospheric impacts that might result from the production and use of reformulated gasoline. Attention is focused on methanol and MTBE, two potential blendstocks that are also hazardous air pollutants, and on maximum achievable control technology standards, which might be applied to the stationary sources that produce them.

  11. Recovery Act: Enhancing State Energy Assurance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugustPastRecovery

  12. Overview of the effect of Title III of the 1990 Clean Air Act Amendments on the natural gas industry

    SciTech Connect (OSTI)

    Child, C.J.

    1995-12-31

    The regulation of hazardous air pollutants by Title III of the Clean Air Act Amendments of 1990 has a potential wide-ranging impact for the natural gas industry. Title III includes a list of 189 hazardous air pollutants (HAPs) which are targeted for reduction. Under Title III, HAP emissions from major sources will be reduced by the implementation of maximum achievable control technology (MACT) standards. If the source is defined as a major source, it must also comply with Title V (operating permit) and Title VII (enhanced monitoring) requirements. This presentation will review Title III`s effect on the natural gas industry by discussing the regulatory requirements and schedules associated with MACT as well as the control technology options available for affected sources.

  13. Affect of Title III of the 1990 Clean Air Act Amendments on military facilities

    SciTech Connect (OSTI)

    Trembly, L.A. [Naval Facilities Engineering Service Center, Port Hueneme, CA (United States)

    1997-12-31

    EPA has promulgated a number of NESHAPs in accordance with Title III of the Clean Air Act Amendments of 1990 (CAAA90) that have affected military installations. This paper provides a survey of NESHAP applicability on military installations and where feasible outlines compliance efforts and quantifies the emission reductions achieved. This paper focuses on NESHAPs promulgated since CAAA90. Specific NESHAPs that will be discussed include Halogenated Solvent Cleaners, Perchloroethylene Dry Cleaners, Chromium Electroplating and Anodizing Tanks, Ship Building and Repair Operations and Aerospace Manufacturing and Rework Operations. Other NESHAPs affecting military installations may be addressed if data are available.

  14. American Recovery & Reinvestment Act Newsletter - Issue 29

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV U.S.

  15. American Recovery & Reinvestment Act Newsletter - Issue 3

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV U.S.3

  16. American Recovery & Reinvestment Act Newsletter - Issue 4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV

  17. American Recovery & Reinvestment Act Newsletter - Issue 5

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5 5 5

  18. American Recovery & Reinvestment Act Newsletter - Issue 6

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5 5 56

  19. American Recovery & Reinvestment Act Newsletter - Issue 7

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5 5

  20. American Recovery & Reinvestment Act Newsletter - Issue 8

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5 5 A

  1. American Recovery & Reinvestment Act Newsletter - Issue 9

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5 5 A9

  2. American Recovery and Reinvestment Act Payments Surge Past $4 Billion |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5 5

  3. American Recovery and Reinvestment Act Payments Surge Past $5 Billion |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges | DepartmentPower - Great NorthernWith all ofRECOVERY.GOV5

  4. US Recovery Act Smart Grid Investment Grant Projects | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OFAMERICA'SHeavyAgencyTendo New EnergyWind Power CoInformation US Recovery

  5. American Recovery and Reinvestment Act | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolarOpen5AllEnergyAmeriPower LLCAmerican Recovery and

  6. Recovery Act Project at Y-12 Meets Another Milestone | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery ActRecovery

  7. Special Report "The American Recovery and Reinvestment Act and the Department of Energy"

    SciTech Connect (OSTI)

    None

    2009-03-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was signed into law on February 17, 2009, as a way to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in science and health, and invest in the Nation's energy future. This national effort will require an unprecedented level of transparency and accountability to ensure that U.S. citizens know where their tax dollars are going and how they are being spent. As part of the Recovery Act, the Department of Energy will receive more than $38 billion to support a number of science, energy, and environmental initiatives. Additionally, the Department's authority to make or guarantee energy-related loans has increased to about $127 billion. The Department plans to disburse the vast majority of the funds it receives through grants, cooperative agreements, contracts, and other financial instruments. The supplemental funding provided to the Department of Energy under the Recovery Act dwarfs the Department's annual budget of about $27 billion. The infusion of these funds and the corresponding increase in effort required to ensure that they are properly controlled and disbursed in a timely manner will, without doubt, strain existing resources. It will also have an equally challenging impact on the inherent risks associated with operating the Department's sizable portfolio of missions and activities and, this is complicated by the fact that, in many respects, the Recovery Act requirements represent a fundamental transformation of the Department's mission. If these challenges are to be met successfully, all levels of the Department's structure and its many constituents, including the existing contractor community; the national laboratory system; state and local governments; community action groups and literally thousands of other contract, grant, loan and cooperative agreement recipients throughout the Nation will have to strengthen existing or design new controls to safeguard Recovery Act funds.

  8. FY 2011 OIG Recovery Act Plan Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program ManagementAct FAQsAnnualAnnualHawaii 1 |

  9. Evaluation of the National Weatherization Assistance Program during Program Years 2009-2011 (American Recovery and Reinvestment Act Period)

    SciTech Connect (OSTI)

    Tonn, Bruce Edward; Rose, Erin M.; Schmoyer, Richard L.; Eisenberg, Joel Fred; Ternes, Mark P.; Schweitzer, Martin; Hendrick, Timothy P.

    2011-12-29

    This report presents the plan that was developed to evaluate the Department of Energy's Weatherization Assistance Program during the American Recovery and Reinvestment Act period.

  10. Recovery Act: Regional Technology Training Centers | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * Impacts onReal-TimeRecord-SettingActEnhancing

  11. Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Center for Nanophase Materials Sciences Oak Ridge National Laboratory 5:45pm Iran Thomas Auditorium Movie Title Runtime Welcome Loop 6:57 Division Announcement 1:27 1...

  12. Finishing Strong in 2011: The Recovery Act at Work at Savannah River Site

    ScienceCinema (OSTI)

    None

    2012-06-14

    American Recovery and Reinvestment Act's highlights and accomplishments for 2011 projects. Covers the latest technology and robotics used for waste management. This video is an overview of the success ARRA brought to the Savannah River Site, the environment, the econonmy, and the surrounding communities.

  13. Grantee Performance Required to Release the Hold on Remaining 50% of Obligated Recovery Act Funds

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization Assistance Program Notice 10-05 deals with performance requirements for program grantees?states and U.S. territories?to receive the remaining 50% of obligated funds under the 2009 American Reinvestment and Recovery Act.

  14. Finishing Strong in 2011: The Recovery Act at Work at Savannah River Site

    SciTech Connect (OSTI)

    None

    2011-01-01

    American Recovery and Reinvestment Act's highlights and accomplishments for 2011 projects. Covers the latest technology and robotics used for waste management. This video is an overview of the success ARRA brought to the Savannah River Site, the environment, the econonmy, and the surrounding communities.

  15. Recovery Act Special Provisions UT-B Contracts Div Page 1 of 3

    E-Print Network [OSTI]

    ; and Requiring prompt referral of evidence of a false claim to the Inspector General. (1) Definitions, but tracking and reporting must be separate to meet the reporting requirements of the Recovery Act and related the how and where for the new reporting requirements. The Seller will be provided these details

  16. Recovery Act Special Provisions Leased Subcontract UT-B Contracts Div Page 1 of 3

    E-Print Network [OSTI]

    of evidence of a false claim to the Inspector General. (1) Definitions For purposes of this clause, "Covered funding as necessary to complete projects, but tracking and reporting must be separate to meet the reporting requirements of the Recovery Act and related Guidance. For projects funded by sources other than

  17. Evidence of recovery of Juniperus virginiana trees from sulfur pollution after the Clean Air Act

    E-Print Network [OSTI]

    Nippert, Jesse

    Evidence of recovery of Juniperus virginiana trees from sulfur pollution after the Clean Air Act decades of acidic pollution. Acid deposition over much of the 20th century reduced stomatal conductance and temporal gradients in natural systems. For over a century, the combustion of fossil fuels resulted

  18. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect (OSTI)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

  19. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

    SciTech Connect (OSTI)

    Robert P. Breckenridge; Thomas R. Wood

    2010-08-01

    The purpose of this document is to evaluate the opportunity for Letterkenny Army Depot (LEAD or the Depot) to utilize biogenic methane, which may be available in shale formations under the Depot, to provide a supplemental source of natural gas that could allow the Depot to increase energy independence. Both the Director and Deputy of Public Works at the Depot are supportive in general of a methane production project, but wanted to better understand the challenges prior to embarking on such a project. This report will cover many of these issues. A similar project has been successfully developed by the U. S. Army at Ft. Knox, KY, which will be explained and referred to throughout this report as a backdrop to discussing the challenges and opportunities at LEAD, because the geologic formations and possibilities at both sites are similar. Prior to discussing the opportunity at LEAD, it is important to briefly discuss the successful methane recovery operation at Ft. Knox, because it is applicable to the projected approach for the LEAD methane system. The Ft. Knox project is an excellent example of how the U. S. Army can use an onsite renewable resource to provide a secure energy source that is not dependent on regional energy networks and foreign oil. At Ft. Knox, the U. S. Army contracted (through a utility co-op) with an energy production company to drill wells, establish a distribution infrastructure, and provide the equipment needed to prepare and compress the produced methane gas for use by base operations. The energy production company agreed to conduct the exploratory investigation at Ft. Knox with no cost to the government, as long as they could be granted a long-term contract if a reliable energy resource was established. The Depot is located, in part, over an Ordovician Age shale formation that may have the potential for producing biogenic methane, similar to the Devonian Age shale found beneath Ft. Knox. However, the Ordovician Age Shale beneath the Letterkenny Depot is not known to have any currently producing gas wells.

  20. Recovery Act - Sustainable Transportation: Advanced Electric Drive Vehicle Education Program

    SciTech Connect (OSTI)

    Caille, Gary

    2013-12-13

    The collective goals of this effort include: 1) reach all facets of this society with education regarding electric vehicles (EV) and plug–in hybrid electric vehicles (PHEV), 2) prepare a workforce to service these advanced vehicles, 3) create web–based learning at an unparalleled level, 4) educate secondary school students to prepare for their future and 5) train the next generation of professional engineers regarding electric vehicles. The Team provided an integrated approach combining secondary schools, community colleges, four–year colleges and community outreach to provide a consistent message (Figure 1). Colorado State University Ventures (CSUV), as the prime contractor, plays a key program management and co–ordination role. CSUV is an affiliate of Colorado State University (CSU) and is a separate 501(c)(3) company. The Team consists of CSUV acting as the prime contractor subcontracted to Arapahoe Community College (ACC), CSU, Motion Reality Inc. (MRI), Georgia Institute of Technology (Georgia Tech) and Ricardo. Collaborators are Douglas County Educational Foundation/School District and Gooru (www.goorulearning.org), a nonprofit web–based learning resource and Google spin–off.

  1. Impending impacts of Title III and Title V of the Clean Air Act Amendments of 1990 on the coal industry

    SciTech Connect (OSTI)

    Kerch, R.L. [Consol, Inc., Pittsburgh, PA (United States)

    1994-12-31

    The coal industry has already begun to feel the affects of the acid deposition title, particularly in Illinois. Two challenges to the producers and sellers of coal; i.e., (1) Title III, Hazardous Air Pollutants and what is in store for customers, and (2) Title V, Operating Permits, which may affect production facilities are discussed. The utilities are temporarily exempted from Title III. The Great Waters report suggests that mercury will be regulated, and it looks like risk assessments will be based on coal analysis rather than on actual emission measurements. Stack sampling is difficult, expensive and slow. Coal cleaning is important in reducing trace elements. Electrostatic precipitators also remove trace elements. ESPs are less effective for mercury and selenium because they are emitted in the gas phase. FGD can remove hazardous air pollutants, but it is not well documented.

  2. Development of a Clean Air Act Title V permit application for Argonne National Laboratory

    SciTech Connect (OSTI)

    Barrett, G.L.

    1994-06-01

    The Clean Air Act Amendments (CAAA) of 1990 instituted major changes in the way that air emission sources are regulated and permitted. Along with being a major research and development laboratory owned by the US Department of Energy, Argonne National Laboratory (ANL) is also classified as a major source of oxides of nitrogen (NO{sub x}) in the Chicago metropolitan area which has been designated by the US Environmental Protection Agency (USEPA) as severe (17) for ozone. As a major source ANL is therefore required under Title V of CAAA to apply for a federally enforceable permit for all sources of air emissions at the facility. While the ANL Boiler House represents the most significant emission source at the Laboratory, there are, nevertheless, a large number of other emission sources, some of which are currently permitted by the State of Illinois and others of which are exempt from state permitting requirements. A large number of R & D related sources are of relatively small magnitude. The ability to identify, inventory, characterize and classify all sources under the various titles of CAAA constitutes a major challenge for R & D laboratories of this size.

  3. Recovery Act. Advanced Load Identification and Management for Buildings

    SciTech Connect (OSTI)

    Yang, Yi; Casey, Patrick; Du, Liang; He, Dawei

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the building sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions, in particular, advanced power strips (APSs) was studied. The project evaluated the market potential for Smart Power Strips (SPSs) with load identification and the likely impact of a load identification feature on APS adoption and effectiveness. The project also identified other success factors required for widespread APS adoption and market acceptance. Even though the developed technology is applicable for both residential and commercial buildings, this project is focused on effective plug-in load control and management for commercial buildings, accomplished through effective load identification. The project has completed Smart Receptacle (SR) prototype development with integration of Load ID, Control/Management, WiFi communication, and Web Service. Twenty SR units were built, tested, and demonstrated in the Eaton lab; eight SR units were tested in the National Renewable Energy Lab (NREL) for one-month of field testing. Load ID algorithm testing for extended load sets was conducted within the Eaton facility and at local university campuses. This report is to summarize the major achievements, activities, and outcomes under the execution of the project.

  4. Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication, Environmental Protection Agency Number ID4890008952

    SciTech Connect (OSTI)

    Holzemer, Michael J.; Hart, Edward

    2015-04-01

    Hazardous Waste Management Act/Resource Conservation and Recovery Act Storage and Treatment Permit Reapplication for the Idaho National Laboratory Materials and Fuels Complex Hazardous Waste Management Act/Resource Conservation and Recovery Act Partial Permit, PER-116. This Permit Reapplication is required by the PER-116 Permit Conditions I.G. and I.H., and must be submitted to the Idaho Department of Environmental Quality in accordance with IDAPA 58.01.05.012 [40 CFR §§ 270.10 and 270.13 through 270.29].

  5. American Recovery and Reinvestment Act of 2009: Summary of Provisions (released in AEO2010)

    Reports and Publications (EIA)

    2010-01-01

    The American Recovery and Reinvestment Act of 2009 (ARRA), signed into law in mid-February 2009, provides significant new federal funding, loan guarantees, and tax credits to stimulate investments in energy efficiency and renewable energy. The provisions of ARRA were incorporated initially as part of a revision to the Annual Energy Outlook 2009 Reference case that was released in April 2009, and they also are included in Annual Energy Outlook 2010.

  6. Recovery Act-Funded 90-m Blade Test Facility Commissioned May 18, 2011 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject Developsfor UCNIEnvironmental Impact StatementRecovery ActDepartment of

  7. Recovery Act Helps Y-12 Exceed Cleanup Goal at Manhattan Project-Era

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI | Department8Recovery Act Helps GE

  8. Recovery Act Workers at Y-12 Reach Two Years of Work with No Injuries |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI | Department8Recovery ActCalifornia

  9. Recovery Act Helps GE in-source Manufacturing | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery Act Helps GE

  10. RECOVERY ACT SELECTIONS FOR SMART GRID INVESTMENT GRANT AWARDS - BY CATEGORY

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||Department of Energy52Building1 RECOVERY ACT

  11. Recovery Act: ArcelorMittal USA Blast Furnace Gas Flare Capture

    SciTech Connect (OSTI)

    Seaman, John

    2013-01-14

    The U.S. Department of Energy (DOE) awarded a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to ArcelorMittal USA, Inc. (ArcelorMittal) for a project to construct and operate a blast furnace gas recovery boiler and supporting infrastructure at ArcelorMittal’s Indiana Harbor Steel Mill in East Chicago, Indiana. Blast furnace gas (BFG) is a by-product of blast furnaces that is generated when iron ore is reduced with coke to create metallic iron. BFG has a very low heating value, about 1/10th the heating value of natural gas. BFG is commonly used as a boiler fuel; however, before installation of the gas recovery boiler, ArcelorMittal flared 22 percent of the blast furnace gas produced at the No. 7 Blast Furnace at Indiana Harbor. The project uses the previously flared BFG to power a new high efficiency boiler which produces 350,000 pounds of steam per hour. The steam produced is used to drive existing turbines to generate electricity and for other requirements at the facility. The goals of the project included job creation and preservation, reduced energy consumption, reduced energy costs, environmental improvement, and sustainability.

  12. Title:

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnicalInformation FederatedInformationTITLE: AUTHOR(S)Patterns,(Journal A uttwr(s):

  13. Assessing the potential visibility benefits of Clean Air Act Title IV emission reductions

    SciTech Connect (OSTI)

    Trexler, E.C. Jr. [USDOE, Washington, DC (United States); Shannon, J.D. [Argonne National Lab., IL (United States)

    1995-06-01

    Assessments are made of the benefits of the 1990 Clean Air Act Title IV (COVE), Phase 2, SO2 and NOX reduction provisions, to the visibility in typical eastern and western Class 1 areas. Probable bands of visibility impairment distribution curves are developed for Shenandoah National Park, Smoky Mountain National Park and the Grand Canyon National Park, based on the existing emissions, ``Base Case``, and for the COVE emission reductions, ``CAAA Case``. Emission projections for 2010 are developed with improved versions of the National Acid Precipitation Assessment Program emission projection models. Source-receptor transfer matrices created with the Advanced Statistical Trajectory Regional Air Pollution (ASTRAP) model are used with existing emission inventories and with the emission projections to calculate atmospheric concentrations of sulfate and nitrate at the receptors of interest for existing and projected emission scenarios. The Visibility Assessment Scoping Model (VASM) is then used to develop distributions of visibility impairment. VASM combines statistics of observed concentrations of particulate species and relative humidity with ASTRAP calculations of the relative changes in atmospheric sulfate and nitrate particulate concentrations in a Monte Carlo approach to produce expected distributions of hourly particulate concentrations and RH. Light extinction relationships developed in theoretical and field studies are then used to calculate the resulting distribution of visibility impairment. Successive Monte Carlo studies are carried out to develop sets of visibility impairment distributions with and without the COVE emission reductions to gain insight into the detectability of expected visibility improvements.

  14. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    ScienceCinema (OSTI)

    None

    2012-06-14

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  15. Recovery Act Weekly Video: 200 Area Asbestos Removal, U-Ancillary Demolition, 200 West Transfer Building Footings

    SciTech Connect (OSTI)

    None

    2010-01-01

    A weekly update of the Recovery Act at work. Demolition of U-Ancillary that was contaminated with uranium and asbestos as well as removing asbestos from the Steam Generation Plant in the 200 East Area.

  16. Recovery Act Special Provisions DOE Inter-Contractor Purchase -Leased Subcontract UT-B Contracts Div Page 1 of 1

    E-Print Network [OSTI]

    Recovery Act ­ Special Provisions ­ DOE Inter-Contractor Purchase - Leased Subcontract UT-B Contracts Div Oct 2009 Page 1 of 1 recovery-special-prov-doe-inter-contractor-leased-sub-ext-oct09.doc OF 2009 ­ DOE INTER-CONTRACTOR PURCHASE ­ LEASED SUBCONTRACT (Oct 2009) PREAMBLE Work performed under

  17. Resource Conservation and Recovery Act (RCRA) closure sumamry for the Uranium Treatment Unit

    SciTech Connect (OSTI)

    1996-05-01

    This closure summary has been prepared for the Uranium Treatment Unit (UTU) located at the Y-12 Plant in Oak Ridge, Tennessee. The actions required to achieve closure of the UTU area are outlined in the Closure Plan, submitted to and approved by the Tennessee Department of Environmental and Conservation staff, respectively. The UTU was used to store and treat waste materials that are regulated by the Resource Conservation and Recovery Act. This closure summary details all steps that were performed to close the UTU in accordance with the approved plan.

  18. www.energy.ca.gov/recovery/documents/funding_summary.pdf 8 HR 1 American Recovery And Reinvestment Act of 2009

    E-Print Network [OSTI]

    www.energy.ca.gov/recovery/documents/funding_summary.pdf 8 HR 1 American Recovery And Reinvestment current law, facilities that produce electricity from solar resources are eligible to take a 30-efficient property and recoup the costs of that property over an extended period of time. #12;www.energy.ca.gov/recovery/documents/funding

  19. Human health benefits of ambient sulfate aerosol reductions under Title IV of the 1990 Clean Air Act amendments

    SciTech Connect (OSTI)

    Chestnut, L.G. [Hagler Bailly Consulting, Inc., Boulder, CO (United States); Watkins, A.M. [Environmental Protection Agency, Washington, DC (United States)

    1997-12-31

    The Acid Rain Provisions (Title IV) of the Clean Air Act Amendments of 1990 call for about a 10 million ton reduction in annual SO{sub 2} emissions in the United States by the year 2010. Although the provisions apply nationwide, most of the reduction will take place in the eastern half of the United States, where use of high sulfur coal for electricity generation is most common. One potentially large benefit of Title IV is the expected reduction in adverse human health effects associated with exposure to ambient sulfate aerosols, a secondary pollutant formed in the atmosphere when SO{sub 2} is present. Sulfate aerosols are a significant constituent of fine particulate (PM{sub 2.5}). This paper combines available epidemiologic evidence of health effects associated with sulfate aerosols and economic estimates of willingness to pay for reductions in risks or incidence of health effects with available estimates of the difference between expected ambient sulfate concentrations in the eastern United States and southeastern Canada with and without Title IV to estimate the expected health benefits of Title IV. The results suggest a mean annual benefit in the eastern United States of $10.6 billion (in 1994 dollars) in 1997 and $40.0 billion in 2010, with an additional $1 billion benefit each year in Ontario and Quebec provinces.

  20. Audit Report on "Management Controls over the Department of Energy's American Recovery and Reinvestment Act - Louisiana State Energy Program"

    SciTech Connect (OSTI)

    2010-05-01

    The Department of Energy's (Department) Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories and the District of Columbia (states) to support their energy priorities through the State Energy Program (SEP). Federal funding is based on a grant formula that considers the population and energy consumption in each state, and amounted to $25 million for Fiscal Year (FY) 2009. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP by authorizing an additional $3.1 billion to states using the existing grant formula. EERE made grant awards to states after reviewing plans that summarize the activities states will undertake to achieve SEP Recovery Act objectives, including preserving and creating jobs; saving energy; increasing renewable energy sources; and, reducing greenhouse gas emissions. EERE program guidance emphasizes that states are responsible for administering SEP within each state, and requires each state to implement internal controls over the use of Recovery Act funds. The State of Louisiana received $71.6 million in SEP Recovery Act funds; a 164-fold increase over its FY 2009 SEP grant of $437,000. As part of the Office of Inspector General's strategy for reviewing the Department's implementation of the Recovery Act, we initiated this review to determine whether the Louisiana State Energy Office had internal controls in place to efficiently and effectively administer Recovery Act funds provided for its SEP program. Louisiana developed a strategy for SEP Recovery Act funding that focused on improving energy efficiency in state buildings, housing and small businesses; increasing Energy Star appliance rebates; and, expanding the use of alternative fuels and renewable energy. Due to a statewide hiring freeze, Louisiana outsourced management of the majority of its projects ($63.3 million) to one general contractor. Louisiana plans to internally manage one project, Education and Outreach ($2.6 million). The remaining funds are allocated to program specific management expenses, including the contractor's fee, a monitoring contract, and Louisiana's payroll expenses ($5.7 million). Louisiana formally approved the general contractor in February 2010. State officials plan to initiate a separate consulting contract for monitoring, verifying and auditing expenditures, energy savings and other metrics as required by EERE for Recovery Act funding.

  1. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    SciTech Connect (OSTI)

    2014-03-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

  2. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    SciTech Connect (OSTI)

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  3. INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

    SciTech Connect (OSTI)

    2009-12-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which w

  4. The American Recovery and Reinvestment Act Includes $4.5 billion for the Office of Electricity Delivery and Energy Reliability

    Broader source: Energy.gov [DOE]

    President Barack Obama signed into law the American Recovery and Reinvestment Act of 2009 (P.L.111-5). The $787 billion economic recovery package represents the largest and most ambitious effort to stimulate the economy in United States history. The Department of Energy (DOE) will be responsible for implementing over $38 billion of the $787 billion package. Of the DOE total, $4.5 Billion is allotted to the Office of Electricity Delivery and Energy Reliability.

  5. AVTA: ChargePoint America Recovery Act project map of charging units

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports describe the distribution of charging infrastructure through the Chargepoint America project, which deployed 4,600 public and home charging stations throughout the U.S. This research was conducted by Idaho National Laboratory.

  6. AVTA: Chrysler RAM Experimental PHEV Pickup Truck Recovery Act Project Testing Results Phase 1

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports describe results of testing done on a 2011 Chrysler RAM PHEV, a demonstration vehicle not currently available for sale. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

  7. AVTA: Chrysler RAM Experimental PHEV Pickup Truck Recovery Act project map

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following map describes the distribution of vehicles for a project with the 2011 Chrysler RAM PHEV, a demonstration vehicle not currently available for sale. This research was conducted by Idaho National Laboratory.

  8. HANFORD TANK FARM RESOURCE CONVERVATION & RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    SciTech Connect (OSTI)

    KRISTOFZSKI, J.G.

    2007-01-15

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper.

  9. Final Scientific/Technical Report [Recovery Act: Districtwide Geothermal Heating Conversion

    SciTech Connect (OSTI)

    Chatterton, Mike

    2014-02-12

    The Recovery Act: Districtwide Geothermal Heating Conversion project performed by the Blaine County School District was part of a larger effort by the District to reduce operating costs, address deferred maintenance items, and to improve the learning environment of the students. This project evaluated three options for the ground source which were Open-Loop Extraction/Re-injection wells, Closed-Loop Vertical Boreholes, and Closed-Loop Horizontal Slinky approaches. In the end the Closed-Loop Horizontal Slinky approach had the lowest total cost of ownership but the majority of the sites associated with this project did not have enough available ground area to install the system so the second lowest option was used (Open-Loop). In addition to the ground source, this project looked at ways to retrofit existing HVAC systems with new high efficiency systems. The end result was the installation of distributed waterto- air heat pumps with water-to-water heat pumps installed to act as boilers/chillers for areas with a high ventilation demand such as they gymnasiums. A number of options were evaluated and the lowest total cost of ownership approach was implemented in the majority of the facilities. The facilities where the lowest total cost of ownership approaches was not selected were done to maintain consistency of the systems from facility to facility. This project had a number of other benefits to the Blaine County public. The project utilizes guaranteed energy savings to justify the levy funds expended. The project also developed an educational dashboard that can be used in the classrooms and to educate the community on the project and its performance. In addition, the majority of the installation work was performed by contractors local to Blaine County which acted as an economic stimulus to the area during a period of recession.

  10. Procedural guidance for reviewing exposure information under RCRA (Resource Conservation and Recovery Act) section 3019. Final report

    SciTech Connect (OSTI)

    Grogan, T.; Kayser, R.

    1986-09-26

    This guidance manual describes the procedures for permit writers in evaluating exposure information submitted under Resource Conservation and Recovery Act (RCRA) Section 3019. The integration of the review with existing RCRA permitting activities is also discussed. The document outlines procedures to follow in referring sites to the Agency for Toxic Substances and Disease Registry (ATSDR) for health evaluations.

  11. Permit applicants' guidance manual for exposure information requirements under RCRA (Resource Conservation and Recovery Act) Section 3019. Final report

    SciTech Connect (OSTI)

    Not Available

    1985-07-03

    The purpose of this document is to provide owners and operators of hazardous-waste landfills and surface impoundments that are subject to permitting under the Resource Conservation and Recovery Act (RCRA) with guidance for submitting information on the potential for public exposure to hazardous wastes, as required by Section 3019 of RCRA.

  12. McMASTER UNIVERSITY Complete Policy Title: An Act Respecting McMaster University

    E-Print Network [OSTI]

    Thompson, Michael

    Master University Act, 1976) Policy Number (if applicable): n/a Approved by: Royal Assent Date of Most Recent Approval: June 7, 1976 (date of Royal Assent) Revision Date(s): Position Responsible for Developing; and whereas Hamilton College was incorporated in 1948 by letters patent under The Companies Act

  13. Recovery Act: SeaMicro Volume Server Power Reduction Research Development

    SciTech Connect (OSTI)

    Gary Lauterbach

    2012-03-22

    Cloud data centers are projected to be the fastest growing segment of the server market through 2015, according to IDC. Increasingly people and businesses rely on the Cloud to deliver digital content quickly and efficiently. Recovery Act funding from the Department of Energy has helped SeaMicro's technologies enhance the total cost of operation, performance and energy efficiency in large data center and Cloud environments. SeaMicro's innovative supercomputer fabric connects thousands of processor cores, memory, storage and input/output traffic. The company's fabric supports multiple processor instruction sets. Current systems featuring SeaMicro technology typically use one quarter the power and take one sixth the space of traditional servers with the same compute performance, yet deliver up to 12 times the bandwidth per core. Mozilla and eHarmony are two customers successfully using SeaMicro's technology. Numerous non-public customers have been successfully using the SeaMicro product in test and production facilities. As a result of the Recovery Act funding from the U.S. Department of Energy, more than 50 direct jobs were created at SeaMicro. To date, they primarily have been high-value, engineering jobs. Hardware, software and manufacturing engineering positions have been created, as well as sales and sales engineering. The positions have allowed SeaMicro to significantly accelerate engineering development and accelerate commercialization. As a result, commercialization and delivery to market are months ahead of initial schedule. Additional jobs were indirectly created through the development of the SeaMicro product. Through many years of research and hard work prior to receipt of public funding, SeaMicro was awarded 2 patents for its work. SeaMicro's product led the way for industry leaders to reconsider the market for low power servers and create new product lines. With valuable support of the U.S. Department of Energy and through SeaMicro's product, the market has been reshaped by the company's unique approach and ground breaking technology.

  14. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  15. Savannah River Site Footprint Reduction Results under the American Recovery and Reinvestment Act - 13302

    SciTech Connect (OSTI)

    Flora, Mary [Savannah River Nuclear Solutions Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions Bldg. 730-4B, Aiken, SC 29808 (United States); Adams, Angelia [United States Department of Energy Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy Bldg. 730-B, Aiken, SC 29808 (United States); Pope, Robert [United States Environmental Protection Agency Region IV Atlanta, GA 30303 (United States)] [United States Environmental Protection Agency Region IV Atlanta, GA 30303 (United States)

    2013-07-01

    The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, managed and operated by Savannah River Nuclear Solutions. Construction of SRS began in the early 1950's to enhance the nation's nuclear weapons capability. Nuclear weapons material production began in the early 1950's, eventually utilizing five production reactors constructed to support the national defense mission. Past operations have resulted in releases of hazardous constituents and substances to soil and groundwater, resulting in 515 waste sites with contamination exceeding regulatory thresholds. More than 1,000 facilities were constructed onsite with approximately 300 of them considered radiological, nuclear or industrial in nature. In 2003, SRS entered into a Memorandum of Agreement with its regulators to accelerate the cleanup using an Area Completion strategy. The strategy was designed to focus cleanup efforts on the 14 large industrial areas of the site to realize efficiencies of scale in the characterization, assessment, and remediation activities. This strategy focuses on addressing the contaminated surface units and the vadose zone and addressing groundwater plumes subsequently. This approach streamlines characterization and remediation efforts as well as the required regulatory documentation, while enhancing the ability to make large-scale cleanup decisions. In February 2009, Congress approved the American Reinvestment and Recovery Act (ARRA) to create jobs and promote economic recovery. At SRS, ARRA funding was established in part to accelerate the completion of environmental remediation and facility deactivation and decommissioning (D and D). By late 2012, SRS achieved 85 percent footprint reduction utilizing ARRA funding by accelerating and coupling waste unit remediation with D and D of remnant facilities. Facility D and D activities were sequenced and permitted with waste unit remediation activities to streamline regulatory approval and execution. Achieving footprint reduction fulfills the Government's responsibility to address legacy contamination; allows earlier completion of legally enforceable compliance agreement milestones; and enables future potential reuse of DOE resources, including land and infrastructure for other missions. Over the last 3.5 years significant achievements were met that contributed to footprint reduction, including the closure of 41 waste units (including 20 miles of radiologically contaminated stream) and decommissioning of 30 facilities (including the precedent setting in situ closure of two former production reactors, the first in the DOE Complex). Other notable achievements included the removal of over 39,750 cubic meters of debris and 68,810 cubic meters of contaminated soils, including 9175 cubic meters of lead-contaminated soil from a former site small arms testing range and treatment of 1,262 cubic meters of tritium-laden soils and concrete using a thermal treatment system. (authors)

  16. Solid waste landfills under the Resource Conservation and Recovery Act Subtitle D

    SciTech Connect (OSTI)

    1995-11-01

    This document provides guidance for meeting: (1) Guidelines for the Land Disposal of Solid Waste (40 CFR 241); (2) Criteria for Classification of Solid Waste Disposal Facilities and Practices (40 CFR 257); and (3) Criteria for Municipal Solid Waste Landfills (MSWLFs) (40 CFR Part 258). Revisions to 40 CFR 257 and a new Part 258 were published in the Federal Register (56 FR 50978, 10/9/91). The Guidelines for the Land Disposal of Solid Waste set requirements and recommended procedures to ensure that the design, construction, and operation of land disposal sites is done in a manner that will protect human health and the environment. These regulations are applicable to MSWLFs and non-MSWLFs (e.g., landfills used only for the disposal of demolition debris, commercial waste, and/or industrial waste). These guidelines are not applicable to the, land disposal of hazardous, agricultural, and/or mining wastes. These criteria are to be used under the Resource Conservation and Recovery Act (RCRA) in determining which solid waste disposal facilities pose a reasonable possibility of adversely affecting human health or the environment. Facilities failing to satisfy these criteria will be considered to be open dumps which are prohibited under Section 4005 of RCRA. The Criteria for MSWLFs are applicable only to MSWLFs, including those MSWLFs in which sewage sludge is co-disposed with household waste. Based on specific criteria, certain MSWLFs are exempt from some, or all, of the regulations of 40 CFR 258. MSWLFs that fail to satisfy the criteria specified in 40 CFR 258 are also considered open dumps for the purposes of Section 4005 of RCRA. Through the use of a series of interrelated flow diagrams, this guidance document directs the reader to each design, operation, maintenance, and closure activity that must be performed for MSWLFs and non-MSWLFs.

  17. Special Report on The Department of Energy's Acquisition Workforce and its Impact on Implementation of the American Recovery and Reinvestment Act of 2009

    SciTech Connect (OSTI)

    2009-03-01

    Signed by the President on February 17, 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) seeks to strengthen the U.S. economy through the creation of new jobs, aiding State and local governments with budget shortfalls, and investing in the long-term health of the Nation's economic prosperity. Under the Recovery Act, the Department of Energy will receive approximately $40 billion for various energy, environmental, and science programs and initiatives. To have an immediate stimulative impact on the U.S. economy, the Department's stated goal is to ensure that these funds are spent as expeditiously as possible, without risking transparency and accountability. Given the Department's almost total reliance on the acquisition process (contracts, grants, cooperative agreements, etc.) to carry out its mission, enhanced focus on contract administration and, specifically, the work performed by Federal acquisition officials is of vital importance as the unprecedented flow of funds begins under the Recovery Act.

  18. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

    1998-12-31

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  19. Proposed Guideline Clarifications for American Recovery and Reinvestment Act of 2009

    E-Print Network [OSTI]

    Wilde, Erik; Kansa, Eric C; Yee, Raymond

    2009-01-01

    APIs for HTML and XHTML. World Wide Web Consortium, Workingfor the recovery Web sites; essentially pre-de?ned HTML codeJacobs. HTML 4.01 Speci?cation. World Wide Web Consortium,

  20. Special Report on the "Department of Energy's Efforts to Meet Accountability and Performance Reporting Objectives of the American Recovery and Reinvestment Act"

    SciTech Connect (OSTI)

    None

    2009-09-01

    The purpose of the American Recovery and Reinvestment Act of 2009 (Recovery Act) was to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy will receive an unprecedented $38 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The Recovery Act requires transparency and accountability over these funds. To this end, the Office of Management and Budget (OMB) issued guidance requiring the Department to compile and report a wide variety of funding, accounting, and performance information. The Department plans to leverage existing information systems to develop accounting and performance information that will be used by program managers and ultimately reported to Recovery.gov, the government-wide source of Recovery Act information, and to OMB. The Department's iManage iPortal, a system that aggregates information from a number of corporate systems, will serve as the main reporting gateway for accounting information. In addition, the Department plans to implement a methodology or system that will permit it to monitor information reported directly to OMB by prime funding recipients. Furthermore, performance measures or metrics that outline expected outcomes are being developed, with results ultimately to be reported in a recently developed Department-wide system. Because of the significance of funds provided and their importance to strengthening the Nation's economy, we initiated this review to determine whether the Department had taken the steps necessary to ensure that Recovery Act funds can be appropriately tracked and are transparent to the public, and whether the benefits of the expenditures can be properly measured and reported clearly, accurately, and in a timely manner. Although not yet fully mature, we found that the Department's efforts to develop, refine, and apply the control structure needed to ensure accurate, timely, and reliable reporting to be both proactive and positive. We did, however, identify certain issues relating to Recovery Act performance management, accounting and reporting accuracy, and timeliness that should be addressed and resolved. In particular, at the time of our review: (1) Program officials had not yet determined whether existing information systems will be able to process anticipated transaction increases associated with the Recovery Act; (2) System modifications made to the Department's performance management system to accommodate Recovery Act performance measures had not yet been fully tested and verified; (3) The ability of prime and sub-recipients to properly segregate and report both accounting and performance information had not been determined; (4) There was a lack of coordination between Headquarters organizations related to aspects of Recovery Act reporting. For example, we observed that the Offices of Fossil Energy and Program, Analysis and Evaluation were both involved in developing job creation estimates that could yield significantly different results; and, (5) A significant portion (91 of 142, or 64 percent) of the performance measures developed for the Recovery Act activities were not quantifiable. In some instances, Project Operating Plans had not been finalized and we were not able to verify that all needed performance measures had been developed. Furthermore, the Department had not developed specific metrics to measure federal and contractor jobs creation and retention, an essential Recovery Act objective. The Department had devoted a great deal of time and resources to identifying and mitigating Recovery Act-related risks. For example, the Department developed a risk assessment tool that is intended to assist programs in identifying risks that can prevent its Recovery Act projects from meeting their intended goals. We also found that program staff and management officials at multiple levels were actively engaged in designing Recovery Act-related control and accountability programs. These efforts ra

  1. Recovery Act Selections for Smart Grid Invesment Grant Awards- By Category

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecoveryRecovery

  2. Recovery Act Selections for Smart Grid Investment Grant Awards - By State -

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecoveryRecoveryUpdated

  3. FINAL TECHNICAL REPORT AMERICAN RECOVERY AND REINVESTMENT ACT NORTH FORK SKOKOMISH POWERHOUSE AT CUSHMAN NO. 2 DAM

    SciTech Connect (OSTI)

    Fischer, Steve; Wilson, Matthew

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  4. Comprehensive Municipal Solid Waste Management, Resource Recovery, and Conservation Act (Texas)

    Broader source: Energy.gov [DOE]

    This Act encourages the establishment of regional waste management facilities and the cooperation of local waste management entities in order to streamline the management of municipal solid waste...

  5. Audit Report on "Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site"

    SciTech Connect (OSTI)

    None

    2010-05-01

    The Department of Energy's Office of Environmental Management's (EM), Richland Operations Office (Richland), is responsible for disposing of the Hanford Site's (Hanford) transuranic (TRU) waste, including nearly 12,000 cubic meters of radioactive contact-handled TRU wastes. Prior to disposing of this waste at the Department's Waste Isolation Pilot Plant (WIPP), Richland must certify that it meets WIPP's waste acceptance criteria. To be certified, the waste must be characterized, screened for prohibited items, treated (if necessary) and placed into a satisfactory disposal container. In a February 2008 amendment to an existing Record of Decision (Decision), the Department announced its plan to ship up to 8,764 cubic meters of contact-handled TRU waste from Hanford and other waste generator sites to the Advanced Mixed Waste Treatment Project (AMWTP) at Idaho's National Laboratory (INL) for processing and certification prior to disposal at WIPP. The Department decided to maximize the use of the AMWTP's automated waste processing capabilities to compact and, thereby, reduce the volume of contact-handled TRU waste. Compaction reduces the number of shipments and permits WIPP to more efficiently use its limited TRU waste disposal capacity. The Decision noted that the use of AMWTP would avoid the time and expense of establishing a processing capability at other sites. In May 2009, EM allocated $229 million of American Recovery and Reinvestment Act of 2009 (Recovery Act) funds to support Hanford's Solid Waste Program, including Hanford's contact-handled TRU waste. Besides providing jobs, these funds were intended to accelerate cleanup in the short term. We initiated this audit to determine whether the Department was effectively using Recovery Act funds to accelerate processing of Hanford's contact-handled TRU waste. Relying on the availability of Recovery Act funds, the Department changed course and approved an alternative plan that could increase costs by about $25 million by processing Hanford TRU-waste on-site rather than at AMWTP. Further, under the newly adopted alternative approach, the Department would fail to achieve the previously anticipated reductions in volume associated with the use of existing AMWTP waste compaction capabilities.

  6. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Geoff Tyree, DOE (509) 376-4171, Geoffrey.Tyree@rl.doe.gov Massive Cement Pour into Hanford Site Nuclear Facility Underway Recovery Act Funding Puts U Canyon in...

  7. Training Underway for TRU Waste Employees Hired For Recovery Act Project |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitle XVIIofTracersTrainingDOEDepartment of

  8. Recovery Act-Information for Special Reporting DOE Inter-Contractor Purchase UT-B Contracts Div Page 1 of 1

    E-Print Network [OSTI]

    Recovery Act- Information for Special Reporting ­ DOE Inter-Contractor Purchase UT- B Contracts Div REQUIRED FROM OTHER DOE INTEGRATED CONTRACTORS FOR SPECIAL REPORTING (Aug 2010) THE INFORMATION PROVIDED Act of 2009 ­ DOE Inter-Contractor Purchase." For definition of jobs created and jobs retained, see

  9. Recovery Act Â… An Interdisciplinary Program for Education and Outreach in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI | Department8Recovery

  10. Recovery Act Â… An Interdisciplinary Program for Education and Outreach in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI | Department8RecoveryTransportation

  11. Recovery Act Provides $9.6 Million for Transformational Energy Research

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudget ||DepartmentReadoutReviewRecordRecovery

  12. Recovery Act Investment Wraps Up, Delivering Major Benefits to the Nation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment of Energy Recovery

  13. ASCR Recovery Act Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorkingLosThe 26thI D- 6 0GrantsThe Life of Enrico'sBudgetASCRProgramRecovery

  14. AL 2015-04 - Implementation of Division D, Title III and Title...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E, Title Title VII of the Consolidated and Further Continuing Appropriations Act, 2015, Pub. L. No.113-235 AL 2015-04 - Implementation of Division D, Title III and Title V,...

  15. INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

    SciTech Connect (OSTI)

    None

    2010-04-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site officials did not always ensure that anomalies, once identified during the quality assurance process, were actually resolved. For example, the Department's process identified that about 740 of the approximately 10,000 jobs reported in the first quarter of Fiscal Year 2010 as created/retained were for projects reported as having no funds spent. Although these problems were referred to site officials for follow-up and/or correction, the information was never actually changed; (2) The Department did not always utilize the correct basis when evaluating the accuracy of 'funds provided' data submitted by grant recipients. For example, in its analysis process, the Department used data reflecting 'funds obligated' rather than the correct amount of 'total grant awards'. This generated a number of potential false positives; and, (3) Duplicate reports by certain recipients, resulting in overstatements of as much as $137 million of the more than $18 billion obligated, were not corrected. We observed that the Department had taken prompt action to ensure that its prime facility management contractors could properly report Recovery Act information. Notably, the seven contractors in this category included in our review had modified their accounting systems, as necessary, to ensure that they could accurately track and report on Recovery Act activities. The systems at each of these entities had been restructured so that they: (i) could separate Recovery Act and non-Recovery Act funds; and, (ii) had adequate processing capacity to handle the projected increase in transactions. We found the Department's decision to limit its reviews to the four elements that it considered to be critical (award amount, invoiced amount, jobs created/retained, and project status) to be reasonable. We concluded, however, other elements or dependent relationships should not be completely excluded from review. Beyond its initial development and implementation of its quality assurance process, the Department had taken steps to improve its ability to ensure that Recovery Act information was both accurate an

  16. FOIA Frequently Requested Documents: DE-EE0002877 Recovery Act | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program ManagementAct FAQs RelatedInc. |Fees The

  17. Preliminary Audit Report on "Management Controls over the Commonwealth of Virginia's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program"

    SciTech Connect (OSTI)

    None

    2010-05-01

    The Department of Energy's (Department) Weatherization Assistance Program received $5 billion under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to improve the energy efficiency of homes, multi-family rental units and mobile homes owned or occupied by low-income persons. Subsequently, the Department awarded a three-year Weatherization Assistance Program grant for $94 million to the Commonwealth of Virginia (Virginia). This grant provided more than a ten-fold increase in funds available to Virginia for weatherization over that authorized in Fiscal Year (FY) 2009. Corresponding to the increase in funding, the Recovery Act increased the limit on the average amount spent to weatherize a home (unit) from $2,500 to $6,500. Virginia's Department of Housing and Community Development (DHCD) administers the Recovery Act grant through 22 local community action agencies. These agencies (sub-grantees) are responsible for determining applicant eligibility, weatherizing homes, and conducting home assessments and inspections. Typical weatherization services include installing insulation; sealing ducts; tuning and repairing furnaces; and, mitigating heat loss through windows, doors and other infiltration points. Virginia plans to use its Recovery Act Weatherization funding to weatherize about 9,193 units over the life of the grant - a significant increase over the 1,475 housing units that were planned to be completed in FY 2009. Given the significant increase in funding and the demands associated with weatherizing thousands of homes, we initiated this audit to determine if Virginia had adequate safeguards in place to ensure that the Weatherization Program was managed efficiently and effectively. The State of Virginia's DHCD had not implemented financial and reporting controls needed to ensure Weatherization Program funds are spent effectively and efficiently. Specifically, DHCD had not: (1) Performed on-site financial monitoring of any of its sub-grantees under the Recovery Act; (2) Reviewed documentation supporting sub-grantee requests for reimbursements to verify the accuracy of amounts charged; (3) Periodically reconciled amounts paid to sub-grantees to the actual cost to weatherize units; (4) Maintained vehicle and equipment inventories as required by Federal regulations and state and Federal program directives; and (5) Accurately reported Weatherization Program results to the Department. Exacerbating weaknesses in DHCD's financial controls, the Department's most recent program monitoring visit to Virginia, made in 2008 before passage of the Recovery Act, did not include a required financial review. Hence, the financial control weaknesses discussed above were not detected and had not been addressed. As described in this report, these control and reporting weaknesses increase the risk that Recovery Act objectives may not be achieved and that fraud, waste or abuse can occur and not be detected in this critically important program.

  18. 1998 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III

    SciTech Connect (OSTI)

    Marjorie B. Stockton

    1999-11-01

    The Emergency Planning and Community Right-to-Know Act (EPCRA) of 1986 [also known as the Superfund Amendment and Reauthorization Act (SARA), Title III], as modified by Executive Order 12856, requires that all federal facilities evaluate the need to submit an annual Toxic Chemical Release Inventory report as prescribed in Title III, Section 313 of this Act. This annual report is due every July for the preceding calendar year. Owners and operators who manufacture, process, or otherwise use certain toxic chemicals above listed threshold quantities are required to report their toxic chemical releases to all environmental mediums (air, water, soil, etc.). At Los Alamos National Laboratory (LANL), no EPCRA Section 313 chemicals were used in 1998 above the reportable threshold limits of 10,000 lb or 25,000 lb. Therefore LANL was not required to submit any Toxic Chemical Release Inventory reports (Form Rs) for 1998. This document was prepared to provide a detailed description of the evaluation on chemical usage and EPCRA Section 313 threshold determinations for LANL for 1998.

  19. Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * Impacts onReal-TimeRecord-SettingAct Workforce

  20. FOIA Frequently Requested Documents: DE-EE0002867 Recovery Act | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program ManagementAct FAQs RelatedInc. |Fees The FOIAof

  1. FOIA Frequently Requested Documents: DE-EE0002884 Recovery Act - Integrated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program ManagementAct FAQs RelatedInc. |Fees TheAlgal

  2. Improving Soil Oklahoma State University, in compliance with Title VI and VII of the Civil Rights Act of

    E-Print Network [OSTI]

    Balasundaram, Balabhaskar "Baski"

    Improving Soil Quality Oklahoma State University, in compliance with Title VI and VII of the Civil and June 30, 1914, in cooperation with the U.S. Department of Agriculture, Director of Oklahoma Cooperative Extension Service, Oklahoma State University, Stillwater, Oklahoma. This publication is printed

  3. 1997 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Heather McBride

    1997-07-01

    The Emergency Planning and Community Right-to-Know Act of 1986 (EPCIL4), Title III, Section 313 [also known as the Superfund Amendment and Reauthorization Act (SARA)], as modified by Executive Order 12856, requires all federal facilities to submit an annual Toxic Chemical Release Inventory report every July for the preceding calendar year. Owners and operators of manufacturing, processing, or production facilities are required to report their toxic chemical releases to all environmental mediums (air, water, soil, etc.). At Los Alamos National Laboratory (LANL), nitric acid was the only toxic chemical used in 1997 that met the reportable threshold limit of 10,000 lb. Form R is the only documentation required by the Environmental Protection Agency, and it is included in the appendix of this report. This report, as requested by DOE, is provided for documentation purposes. In addition, a detailed description of the evaluation and reporting process for chemicals and processes at LANL has been included.

  4. SRS Seals Access to P and R Reactors, Marking End to Nearly 60-Years of History: American Recovery and Reinvestment Act Project Progress

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. — With investments from the American Recovery and Reinvestment Act, the U.S. Department of Energy and Savannah River Nuclear Solutions, LLC, (SRNS) today sealed the access to the historic P and R Reactors as part of footprint reduction and legacy cleanup at the Savannah River Site.

  5. Recovery Act: Johnston Rhode Island Combined Cycle Electric Generating Plant Fueled by Waste Landfill Gas

    SciTech Connect (OSTI)

    Galowitz, Stephen

    2013-06-30

    The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Central Landfill in Johnston, Rhode Island. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting project reflected a cost effective balance of the following specific sub-objectives. 1) Meet environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas. 2) Utilize proven and reliable technology and equipment. 3) Maximize electrical efficiency. 4) Maximize electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Central Landfill. 5) Maximize equipment uptime. 6) Minimize water consumption. 7) Minimize post-combustion emissions. To achieve the Project Objective the project consisted of several components. 1) The landfill gas collection system was modified and upgraded. 2) A State-of-the Art gas clean up and compression facility was constructed. 3) A high pressure pipeline was constructed to convey cleaned landfill gas from the clean-up and compression facility to the power plant. 4) A combined cycle electric generating facility was constructed consisting of combustion turbine generator sets, heat recovery steam generators and a steam turbine. 5) The voltage of the electricity produced was increased at a newly constructed transformer/substation and the electricity was delivered to the local transmission system. The Project produced a myriad of beneficial impacts. 1) The Project created 453 FTE construction and manufacturing jobs and 25 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. 2) By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). 3) The Project will annually produce 365,292 MWh?s of clean energy. 4) By destroying the methane in the landfill gas, the Project will generate CO{sub 2} equivalent reductions of 164,938 tons annually. The completed facility produces 28.3 MWnet and operates 24 hours a day, seven days a week.

  6. Examination of utility Phase 1 compliance choices and state reactions to Title IV of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Bailey, K.A.; Elliott, T.J.; Carlson, L.J.; South, D.W.

    1993-11-01

    Title IV (acid rain) of the Clean Air Act Amendments of 1990 is imposing new limitations on the emission of sulfur dioxide (SO{sub 2}) and nitrogen oxides (N{sub x}) from electric power plants. The act requires utilities to develop compliance plans to reduce these emissions, and indications are that these plans will dramatically alter traditional operating procedures. A key provision of the SO{sub 2} control program deaned in Title IV is the creation of a system of emission allowances, with utilities having the option of complying by adjusting system emissions and allowance holdings. A compilation of SO{sub 2} compliance activities by the 110 utility plants affected by Phase I is summarized in this report. These compliance plans are presented in a tabular form, correlated with age, capacity, and power pool data. A large number of the Phase I units (46%) have chosen to blend or switch to lower sulfur coals. This choice primarily is in response to (1) prices of low-sulfur coal and (2) the need to maintain SO{sub 2} control flexibility because of uncertain future environmental regulations (e.g., air toxics, carbon dioxide) and compliance prices. The report also discusses the responses of state legislatures and public utility commissions to the compliance requirements in Title IV. Most states have taken negligible action regarding the regulatory treatment of allowances and compliance activities. To protect mine employment, states producing high-sulfur coal have enacted regulations encouraging continued use of that coal, but for the most part, this response has had little effect on utility compliance choices.

  7. RCRA Subtitle C TSD facilities and solvent recovery facilities: Section 313 of the Emergency Planning and Community Right-to-Know Act. Toxic chemical release inventory; Industry guidance

    SciTech Connect (OSTI)

    1999-01-01

    The purpose of this guidance document is to assist facilities in SIC code 4953 that are regulated under the Resource Conservation and Recovery Act (RCRA), Subtitle C and facilities in SIC code 7389 that are primarily engaged in solvent recovery services on a contract or fee basis. This document explains the EPCRA Section 313 and PPA Section 6607 reporting requirements (collectively referred to as the EPCRA Section 313) reporting requirements, and discusses specific release and other waste management activities encountered at many facilities in these industries. The objectives of this manual are to: clarify EPCRA Section 313 requirements for industry; increase the accuracy and completeness of the data being reported by RCRA Subtitle C TSD and solvent recovery facilities; and reduce the level of effort expended by those facilities that prepare an EPCRA Section 313 report.

  8. Special Report on Review of "The Department of Energy's Quality Assurance Process for Prime Recipients' Reporting for the American Recovery and Reinvestment Act"

    SciTech Connect (OSTI)

    None

    2009-10-01

    The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy (Department) will receive an unprecedented $37 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The majority of the funding received by the Department will be allocated to various recipients through grants, cooperative agreements, contracts, and other financial instruments. To ensure transparency and accountability, the Office of Management and Budget (OMB) requires that recipients report on their receipt and use of Recovery Act funds on a quarterly basis to FederalReporting.gov. OMB also specifies that Federal agencies should develop and implement formal procedures to help ensure the quality of recipient reported information. Data that must be reported by recipients includes total funding received; funds expended or obligated; projects or activities for which funds were obligated or expended; and the number of jobs created and/or retained. OMB requires that Federal agencies perform limited data quality reviews of recipient data to identify material omissions and/or significant reporting errors and notify the recipients of the need to make appropriate and timely changes to erroneous reports. As part of a larger audit of recipient Recovery Act reporting and performance measurement and in support of a Government-wide review sponsored by the Recovery Accountability and Transparency Board, we completed an interim review to determine whether the Department had established a process to ensure the quality and accuracy of recipient reports. Our review revealed that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data. The process included procedures to compare existing information from the Department's financial information systems with that reported to FederalReporting.gov by recipients. In addition, plans were in place to notify recipients of anomalies and/or errors exposed by the quality assurance process. While the Department has made a good deal of progress in this area, we did, however, identify several issues which could, if not addressed, impact the effectiveness of the quality assurance process.

  9. Interactions between Energy Efficiency Programs funded under the Recovery Act and Utility Customer-Funded Energy Efficiency Programs

    SciTech Connect (OSTI)

    Goldman, Charles A.; Stuart, Elizabeth; Hoffman, Ian; Fuller, Merrian C.; Billingsley, Megan A.

    2011-02-25

    Since the spring of 2009, billions of federal dollars have been allocated to state and local governments as grants for energy efficiency and renewable energy projects and programs. The scale of this American Reinvestment and Recovery Act (ARRA) funding, focused on 'shovel-ready' projects to create and retain jobs, is unprecedented. Thousands of newly funded players - cities, counties, states, and tribes - and thousands of programs and projects are entering the existing landscape of energy efficiency programs for the first time or expanding their reach. The nation's experience base with energy efficiency is growing enormously, fed by federal dollars and driven by broader objectives than saving energy alone. State and local officials made countless choices in developing portfolios of ARRA-funded energy efficiency programs and deciding how their programs would relate to existing efficiency programs funded by utility customers. Those choices are worth examining as bellwethers of a future world where there may be multiple program administrators and funding sources in many states. What are the opportunities and challenges of this new environment? What short- and long-term impacts will this large, infusion of funds have on utility customer-funded programs; for example, on infrastructure for delivering energy efficiency services or on customer willingness to invest in energy efficiency? To what extent has the attribution of energy savings been a critical issue, especially where administrators of utility customer-funded energy efficiency programs have performance or shareholder incentives? Do the new ARRA-funded energy efficiency programs provide insights on roles or activities that are particularly well-suited to state and local program administrators vs. administrators or implementers of utility customer-funded programs? The answers could have important implications for the future of U.S. energy efficiency. This report focuses on a selected set of ARRA-funded energy efficiency programs administered by state energy offices: the State Energy Program (SEP) formula grants, the portion of Energy Efficiency and Conservation Block Grant (EECBG) formula funds administered directly by states, and the State Energy Efficient Appliance Rebate Program (SEEARP). Since these ARRA programs devote significant monies to energy efficiency and serve similar markets as utility customer-funded programs, there are frequent interactions between programs. We exclude the DOE low-income weatherization program and EECBG funding awarded directly to the over 2,200 cities, counties and tribes from our study to keep its scope manageable. We summarize the energy efficiency program design and funding choices made by the 50 state energy offices, 5 territories and the District of Columbia. We then focus on the specific choices made in 12 case study states. These states were selected based on the level of utility customer program funding, diversity of program administrator models, and geographic diversity. Based on interviews with more than 80 energy efficiency actors in those 12 states, we draw observations about states strategies for use of Recovery Act funds. We examine interactions between ARRA programs and utility customer-funded energy efficiency programs in terms of program planning, program design and implementation, policy issues, and potential long-term impacts. We consider how the existing regulatory policy framework and energy efficiency programs in these 12 states may have impacted development of these selected ARRA programs. Finally, we summarize key trends and highlight issues that evaluators of these ARRA programs may want to examine in more depth in their process and impact evaluations.

  10. Effects of Title IV of the Clean Air Act Amendments of 1990 on Electric Utilities: An Update, The

    Reports and Publications (EIA)

    1997-01-01

    Describes the strategies used to comply with the Acid Rain Program in 1995, the effect of compliance on SO2 emissions levels, the cost of compliance, and the effects of the program on coal supply and demand. It updates and expands the EIA report, Electric Utility Phase I Acid Rain Compliance Strategies for the Clean Air Act Amendments of 1990.

  11. Recovery Act Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transfer line upgrades near completion Testing begins on field-deployable tank waste vacuum system Testing began on an RA-funded system that uses a vacuum mounted on the end of a...

  12. Recovery Act Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    milestone by completing the design of an in-tank mixer pump that will be used to stir the waste stored in Hanford's double-shell tanks before it is transferred to the WTP. The team...

  13. Recovery Act Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    six-inch encasement pipes and have a total combined length of nearly two and a half football fields. To accomplish their task, crews need a pipe-cutting tool that will be able to...

  14. Recovery Act – Transportation Electrification

    SciTech Connect (OSTI)

    Gogineni, Kumar

    2013-12-31

    ChargePoint America demonstrated the viability, economic and environmental benefits of an electric vehicle-charging infrastructure. Electric vehicles (EVs) and plug-in electric vehicles (PHEVs) arrived in late 2010, there was a substantial lack of infrastructure to support these vehicles. ChargePoint America deployed charging infrastructure in ten (10) metropolitan regions in coordination with vehicle deliveries targeting those same regions by our OEM partners: General Motors, Nissan, Fisker Automotive, Ford, smart USA, and BMW. The metropolitan regions include Central Texas (Austin/San Antonio), Bellevue/Redmond (WA), Southern Michigan, Los Angeles area (CA), New York Metro (NY), Central Florida (Orlando/Tampa), Sacramento (CA), San Francisco/San Jose (CA), Washington DC and Boston (MA). ChargePoint America installed more than 4,600 Level 2 (220v) SAE J1772™ UL listed networked charging ports in home, public and commercial locations to support approximately 2000 program vehicles. ChargePoint collected data to analyze how individuals, businesses and local governments used their vehicles. Understanding driver charging behavior patterns will provide the DoE with critical information as EV adoption increases in the United States.

  15. OE Recovery Act Blog

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News enDepartment ofProgramSeptember 5,May 23,blog Office

  16. Recovery Act Open House

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * Impacts onReal-TimeRecord-Setting MicroscopyRecordsRODsDepartment

  17. OE Recovery Act News

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOEDepartmentNew2008Group, Inc. Order(National4, 2014 FY 2015news Office

  18. In compliance with state requirements for submission of reports under Title II of the Higher Education Act, the following report is submitted to the Division of Teacher Quality, South Carolina State Department of Education

    E-Print Network [OSTI]

    In compliance with state requirements for submission of reports under Title II of the Higher Education Act, the following report is submitted to the Division of Teacher Quality, South Carolina State Department of Education: Institutional Report April 7, 2009 University of South Carolina Columbia #12

  19. Analysis of the Clean Air Act Amendments of 1990: A forecast of the electric utility industry response to Title IV, Acid Deposition Control

    SciTech Connect (OSTI)

    Molburg, J.C.; Fox, J.A.; Pandola, G.; Cilek, C.M.

    1991-10-01

    The Clean Air Act Amendments of 1990 incorporate, for the first time, provisions aimed specifically at the control of acid rain. These provisions restrict emissions of sulfur dioxide (SO{sub 2}) and oxides of nitrogen (NO{sub x}) from electric power generating stations. The restrictions on SO{sub 2} take the form of an overall cap on the aggregate emissions from major generating plants, allowing substantial flexibility in the industry`s response to those restrictions. This report discusses one response scenario through the year 2030 that was examined through a simulation of the utility industry based on assumptions consistent with characterizations used in the National Energy Strategy reference case. It also makes projections of emissions that would result from the use of existing and new capacity and of the associated additional costs of meeting demand subject to the emission limitations imposed by the Clean Air Act. Fuel-use effects, including coal-market shifts, consistent with the response scenario are also described. These results, while dependent on specific assumptions for this scenario, provide insight into the general character of the likely utility industry response to Title IV.

  20. Analysis of the Clean Air Act Amendments of 1990: A forecast of the electric utility industry response to Title IV, Acid Deposition Control

    SciTech Connect (OSTI)

    Molburg, J.C.; Fox, J.A.; Pandola, G.; Cilek, C.M.

    1991-10-01

    The Clean Air Act Amendments of 1990 incorporate, for the first time, provisions aimed specifically at the control of acid rain. These provisions restrict emissions of sulfur dioxide (SO[sub 2]) and oxides of nitrogen (NO[sub x]) from electric power generating stations. The restrictions on SO[sub 2] take the form of an overall cap on the aggregate emissions from major generating plants, allowing substantial flexibility in the industry's response to those restrictions. This report discusses one response scenario through the year 2030 that was examined through a simulation of the utility industry based on assumptions consistent with characterizations used in the National Energy Strategy reference case. It also makes projections of emissions that would result from the use of existing and new capacity and of the associated additional costs of meeting demand subject to the emission limitations imposed by the Clean Air Act. Fuel-use effects, including coal-market shifts, consistent with the response scenario are also described. These results, while dependent on specific assumptions for this scenario, provide insight into the general character of the likely utility industry response to Title IV.

  1. Weatherization Formula Grants - American Recovery and Reinvestment...

    Energy Savers [EERE]

    Weatherization Formula Grants - American Recovery and Reinvestment Act (ARRA) Weatherization Formula Grants - American Recovery and Reinvestment Act (ARRA) U.S. Department of...

  2. EMPLOYEE: ______________________________________ SSN: _____________________________ JOB TITLE: _______________________________________________________________________________

    E-Print Network [OSTI]

    : __________________________________________________________________________________________ __________________________________________________________________________________________ __________________________________________________________________________________________ HRM APPROVAL: _____________________________________ ____________________ Date TITLE

  3. The effects of Title IV of the Clean Air Act amendments of 1990 on electric utilities: An update

    SciTech Connect (OSTI)

    NONE

    1997-03-01

    This report presents data and analyses related to Phase I implementation of the Clean Air Act Amendment by electric utilities. It describes the strategies used to comply with the Acid Rain Program in 1995, the effect of compliance on sulfur dioxide emissions levels, the cost of compliance, and the effects of the program on coal supply and demand. The first year of Phase I demonstrated that the market-based sulfur dioxide emissions control system could achieve significant reductions in emissions at lower than expected costs. Some utilities reduced aggregate emissions below legal requirements due to economic incentives; other utilities purchased additional allowances to avoid noncompliance. More than half of the utilities switched to or blended with lower sulfur coal, due to price reductions in the coal market which were partially due to the allowance trading program. 21 figs., 20 tabs.

  4. Inherently safe in situ uranium recovery (Patent) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Inherently safe in situ uranium recovery Citation Details In-Document Search Title: Inherently safe in situ uranium recovery An in situ recovery of uranium operation involves...

  5. Synergies and conflicts in multimedia pollution control related to utility compliance with Title IV of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    Bailey, K.A.; Loeb, A.P.; Formento, J.W.; South, D.W.

    1994-01-01

    Most analyses of utility strategies for meeting Title IV requirements in the Clean Air Act Amendments of 1990 have focused on factors relating directly to utilities` sulfur dioxide control costs; however, there are a number of additional environmental requirements that utilities must meet at the same time they comply with the acid rain program. To illuminate the potential synergies and conflicts that these other regulatory mandates may have in connection with the acid rain program, it is necessary to conduct a thorough, simultaneous examination of the various programs. This report (1) reviews the environmental mandates that utilities must plant to meet in the next decade concurrently with those of the acid rain program, (2) evaluates the technologies that utilities may select to meet these requirements, (3) reviews the impacts of public utility regulation on the acid rain program, and (4) analyzes the interactions among the various programs for potential synergies and conflicts. Generally, this report finds that the lack of coordination among current and future regulatory programs may result in higher compliance costs than necessary. Failure to take advantage of cost-effective synergies and incremental compliance planning will increase control costs and reduce environmental benefits.

  6. DOE FY 2010 Budget Request and Recovery Act Funding for Energy Research, Development, Demonstration, and Deployment: Analysis and Recommendations

    SciTech Connect (OSTI)

    Anadon, Laura Diaz; Gallagher, Kelly Sims; Bunn, Matthew

    2009-06-01

    The combination of the FY 2010 budget request for the Department of Energy (DOE) and the portion of the American Recovery and Reinvestment Act of 2009 (ARRA) funds likely to be available in 2010 would (assuming that they would be split evenly between FY 2010 and FY 2011) result in a doubling in funding available for energy research, development, and deployment (ERD and D) from $3.6 billion in FY 2009 to $7.2 billion in FY 2010. Without the stimulus funds, DOE ERD and D investments in FY 2010 would decrease very slightly when compared to FY 2009. Excluding the $7.5 billion for the Advanced Technology Vehicles Manufacturing Loans in FY 2009, the FY 2010 budget request for deployment represents a 33 percent decrease from the FY 2009 levels from $520 million to $350 million. This decrease is largely due to the large amounts of funds appropriated in ARRA for DOE deployment programs, or $23.6 billion, which are three times greater than those appropriated in the FY 2009 budget. These very substantial funding amounts, coupled with the broad range of institutional innovations the administration is putting in place and movement toward putting a price on carbon emissions, will help accelerate innovation for a broad range of energy technologies. DOE's Advanced Research Projects Agency-Energy (ARPA-E) and the Energy Innovation Hubs are important initiatives that could contribute to two weak points of the government's energy innovation effort, namely funding high-risk projects in transformational technologies and in companies that have not traditionally worked with the government and strengthening the integration of basic and applied research in priority areas. Increasing the funding for different types of energy storage research, providing some support for exploring opportunities in coal-to-liquids with carbon capture and storage (CCS) and coal-and-biomass-to-liquids with CCS, and reducing funding for fission RD and D are other actions that Congress could take in the short-term. Energy storage may play a crucial role in the future of the power and transportation systems, which together consume two thirds of primary energy in the United States. A recent National Academy of Science report recommended carrying out detailed scenario assessments of the penetration of unconventional fuels from coal and coal and biomass with CCS. And the research plan provided for nuclear fission does not justify spending as many funds as were requested. The proposed funding for FY 2010 and the resources from ARRA, however, do not guarantee that the United States will finally enjoy the predictable and consistent publicly-funded energy technology innovation effort that it needs. The Obama administration must put in place a comprehensive energy technology innovation strategy that will ensure that an expanded ERD3 effort is both sustainable and efficient. This commission would be charged with, inter alia, developing a strategy that optimizes the integration of the various stages of innovation (research, development, demonstration, early deployment), as well as integrates efforts across technology areas. The database upon which this analysis is based may be downloaded in Excel format at: http://belfercenter.ksg.harvard.edu/publication/19119/ .

  7. Comprehensive Energy Assessment: EE and RE Project Optimization Modeling for United States Pacific Command (USPACOM) American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

    SciTech Connect (OSTI)

    Brigantic, Robert T.; Papatyi, Anthony F.; Perkins, Casey J.

    2010-09-30

    This report summarizes a study and corresponding model development conducted in support of the United States Pacific Command (USPACOM) as part of the Federal Energy Management Program (FEMP) American Reinvestment and Recovery Act (ARRA). This research was aimed at developing a mathematical programming framework and accompanying optimization methodology in order to simultaneously evaluate energy efficiency (EE) and renewable energy (RE) opportunities. Once developed, this research then demonstrated this methodology at a USPACOM installation - Camp H.M. Smith, Hawaii. We believe this is the first time such an integrated, joint EE and RE optimization methodology has been constructed and demonstrated.

  8. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 282 Renewable Energy Opportunities at Fort Gordon, Georgia

    SciTech Connect (OSTI)

    Boyd, Brian K.; Gorrissen, Willy J.; Hand, James R.; Horner, Jacob A.; Orrell, Alice C.; Russo, Bryan J.; Weimar, Mark R.; Williamson, Jennifer L.; Nesse, Ronald J.

    2010-09-30

    This document provides an overview of renewable resource potential at Fort Gordon, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the American Recovery and Reinvestment Act (ARRA) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Gordon took place on March 9, 2010.

  9. Recovery of sugars from ionic liquid biomass liquor by solvent...

    Office of Scientific and Technical Information (OSTI)

    Patent: Recovery of sugars from ionic liquid biomass liquor by solvent extraction Citation Details In-Document Search Title: Recovery of sugars from ionic liquid biomass liquor by...

  10. Recovery Act: Develop a Modular Curriculum for Training University Students in Industry Standard CO{sub 2} Sequestration and Enhanced Oil Recovery Methodologies

    SciTech Connect (OSTI)

    Trentham, R. C.; Stoudt, E. L.

    2013-05-31

    CO{sub 2} Enhanced Oil Recovery, Sequestration, & Monitoring Measuring & Verification are topics that are not typically covered in Geoscience, Land Management, and Petroleum Engineering curriculum. Students are not typically exposed to the level of training that would prepare them for CO{sub 2} reservoir and aquifer sequestration related projects when they begin assignments in industry. As a result, industry training, schools & conferences are essential training venues for new & experienced personnel working on CO{sub 2} projects for the first time. This project collected and/or generated industry level CO{sub 2} training to create modules which faculties can utilize as presentations, projects, field trips and site visits for undergrad and grad students and prepare them to "hit the ground running" & be contributing participants in CO{sub 2} projects with minimal additional training. In order to create the modules, UTPB/CEED utilized a variety of sources. Data & presentations from industry CO{sub 2} Flooding Schools & Conferences, Carbon Management Workshops, UTPB Classes, and other venues was tailored to provide introductory reservoir & aquifer training, state-of-the-art methodologies, field seminars and road logs, site visits, and case studies for students. After discussions with faculty at UTPB, Sul Ross, Midland College, other universities, and petroleum industry professionals, it was decided to base the module sets on a series of road logs from Midland to, and through, a number of Permian Basin CO{sub 2} Enhanced Oil Recovery (EOR) projects, CO{sub 2} Carbon Capture and Storage (CCUS) projects and outcrop equivalents of the formations where CO{sub 2} is being utilized or will be utilized, in EOR projects in the Permian Basin. Although road logs to and through these projects exist, none of them included CO{sub 2} specific information. Over 1400 miles of road logs were created, or revised specifically to highlight CO{sub 2} EOR projects. After testing a number of different entry points into the data set with students and faculty form a number of different universities, it was clear that a standard website presentation with a list of available power point presentations, excel spreadsheets, word documents and pdf's would not entice faculty, staff, and students at universities to delve deeper into the website http://www.utpb.edu/ceed/student modules.

  11. Women as Stakeholders: A Gendered Analysis of the American Recovery and Reinvestment Act in New York City

    E-Print Network [OSTI]

    James, Heather

    2010-01-01

    and Reducing Poverty in New York City. New York: CommissionIt is important that New York City and other localitiesReinvestment Act in New York City Approximately 8,400,000

  12. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    SciTech Connect (OSTI)

    2012-03-01

    This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

  13. Implementation of the Clean Air Act, Title III, Section 112(r) Prevention of Accidental Release Rule requirements at U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.; Fellers, H.L. [Lockheed-Martin Energy Systems K-25 Site, Oak Ridge, TN (United States)

    1997-12-31

    Title III, Section 112(r) of the Clean Air Act (CAA) Amendments of 1990 requires the Environmental Protection Agency (EPA) to promulgate regulations to prevent accidental releases of regulated substances and to reduce the severity of those releases that do occur. The final EPA rule for Risk Management Programs under Section 112(r)(7) of the CAA, promulgated June 20, 1996, applies to all stationary sources with processes that contain more than a threshold quantity of any of 139 regulated substances listed under 40 CFR 68.130. All affected sources will be required to prepare a risk management plan which must be submitted to EPA and be made available to state and local governments and to the public. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of the Prevention of Accidental Release Rule. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the K-25 Site. The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the K-25 Site conducts a variety of research and development activities and is the home of a mixed waste incinerator. ORR activities underway and soon to be undertaken toward implementation of the Prevention of Accidental Release Rule include: compilation of inventories of regulated substances at all processes at each of the three ORR Facilities for determination of affected processes and facilities; plans for inventory reduction to levels below threshold quantities, where necessary and feasible; determination of the overlap of processes subject to the OSHA PSM Standard and determination of parallel requirements; preparation of Risk Management Plans and Programs for affected processes and facilities including detailed requirements for hazard assessment, prevention, and emergency response.

  14. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc.

  15. Implementation of Title V in California

    SciTech Connect (OSTI)

    Werner, B.; Cook, B.

    1996-12-31

    This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

  16. The University of California, in compliance with Titles VI and VII of the Civil Rights Act of 1964, Title IX of the Education Amendments of 1972, Sections 503 and 504 of the Rehabilitation Act of 1973, and the Age Discrimination Act of 1975, does not disc

    E-Print Network [OSTI]

    Ishida, Yuko

    , and the Age Discrimination Act of 1975, does not discriminate on the basis of race, religion, color, national to any of its employment policies, practices, or procedures. Nor does the University of California

  17. State and local compliance with Title I of the Clean Air Act. Hearing before the Subcommittee on Clean Air and Nuclear Regulation of the Committee on Environment and Public Works, United States Senate, One Hundred Third Congress, First Session, August 3, 1993

    SciTech Connect (OSTI)

    NONE

    1993-12-31

    The hearing addresses State and local compliance with Title I of The Clean Air Act. Implementation of the Act at local levels are examined, along with difficulties in meeting the clean air attainment goals. Statements of government, academic and industry officials are included along with documents submitted for the record.

  18. The University of California, in compliance with Titles VI and VII of the Civil Rights Act of 1964, Title IX of the Education Amendments of 1972, Sections 503 and 504 of the Rehabilitation Act of 1973, and the Age Discrimination Act of 1975, does not disc

    E-Print Network [OSTI]

    Ishida, Yuko

    , and the Age Discrimination Act of 1975, does not discriminate on the basis of race, religion, color, national to any of its employment policies, practices, or procedures. Nor does the University of California. This, of course, does not apply to those who have already prepaid for a certain time period. We do hope

  19. Inherently safe in situ uranium recovery (Patent) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Inherently safe in situ uranium recovery Citation Details In-Document Search Title: Inherently safe in situ uranium recovery You are accessing a document from the Department of...

  20. Real Estate Appraisal Reform: What Is it Worth? An Examination of Title XI of the Financial Institutions Reform, Recovery and Enforcement Act of 1989

    E-Print Network [OSTI]

    Slates, Roger D. II

    1990-01-01

    The Real Estate Appraisal. . .Regulation of Real Estate Appraisers. . . . . . TheSolutions? ," Real Estate Appraiser and Analvst, Summer

  1. Recovery Act: State Assistance for Recovery Act Related Electricity...

    Energy Savers [EERE]

    energy, carbon capture and storage, transmission lines, energy storage, smart grid, demand response equipment, and electric and hybrid-electric vehicles. View a full list of...

  2. Recovery Act: State Assistance for Recovery Act Related Electricity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartmentDepartment ofPolicies |

  3. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    their research thesis titled "Linking Supercomputing and Systems Biology for Efficient Bioethanol Production." The students -- Scott Horton, Scott Molony and Steven Arcangeli --...

  4. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Albuquerque, N.M. The entry, titled "Martensitic Transformation in an Austenitic Stainless Steel Single Crystal," won in the color microscopy category. Metallography is...

  5. RECOVERY ACT UPDATE C H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts Awards As of September 2010 5,298 Lives touched 1 596M Contracts awarded 55% Contracts awarded to small businesses As of September 2010 As of June 2010 Radio tower...

  6. RECOVERY ACT UPDATE C H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts Awards As of November 2010 5,298 Lives touched 1 642M Contracts awarded 55% Contracts awarded to small businesses As of November 2010 As of June 2010 In the 3A burial...

  7. RECOVERY ACT UPDATE C H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts Awards As of July 2010 4,547 Lives touched 1 523M Contracts awarded 56% Contracts awarded to small businesses As of July 2010 As of March 2010 Fuel storage vaults...

  8. RECOVERY ACT UPDATE C H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts Awards As of November 2010 5,298 Lives touched 1 642M Contracts awarded 55% Contracts awarded to small businesses As of November 2010 As of June 2010 CH2M HILL...

  9. RECOVERY ACT UPDATE C H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    systems, and the 1706KER Water Studies Recirculation Building housed water treatment, heat exchange, pumping and other equipment. Later this summer, CH2M HILL is also planning...

  10. EM Recovery Act Press Releases

    Broader source: Energy.gov (indexed) [DOE]

  11. Recovery Act State Memos Connecticut

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Cities. These Clean Cities coalitions support efforts to facilitate the adoption of alternate fuels and petroleum-reducing technologies in Connecticut. Connecticut is also...

  12. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: JuliaDepartment-8-2008RSSa WebcastA listing ofNovember 29,

  13. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: JuliaDepartment-8-2008RSSa WebcastA listing ofNovember

  14. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: JuliaDepartment-8-2008RSSa WebcastA listing ofNovemberApril

  15. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary From: JuliaDepartment-8-2008RSSa WebcastA listing

  16. ARM and the Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, AlaskaDatabaseSearchTipsWith

  17. Department of Energy - Recovery Act

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electricLaboratory | version ofEnergy

  18. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments to OE

  19. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments to OEJuly

  20. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments to

  1. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments toOctober

  2. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments

  3. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments20, 2014

  4. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments20,

  5. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments20,April 16,

  6. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidentialThis 3-DMarch 9, 2015 Cumulative Federal Payments20,April

  7. Microsoft Word - Recovery Act Cover

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOE SafetyofDepartment. " 21 ranDay: Tuesday Date: December 1

  8. State Agency Recovery Act Funding

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVESDepartmentSpecialCode of RecordTech to the MarketAgency

  9. Recovery Act | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudgetFinancial Opportunities » Past Opportunities »

  10. Recovery Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice|inWestMay 13, 2015 The new technology repelsExamination5 View3,

  11. Recovery Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugustPast

  12. Highlights from U.S. Department of Energy's Fuel Cell Recovery...

    Broader source: Energy.gov (indexed) [DOE]

    sheets highlights fuel cell projects funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act). A total of 41.6 million in Recovery Act funding supported the...

  13. Synergies and conflicts in multimedia pollution control related to utility compliance with Title IV of the Clean Air Act Amendments of 1990

    SciTech Connect (OSTI)

    South, D.W.; Bailey, K.A.

    1993-11-01

    Most analyses of the alternative strategies used by utilities to comply with Title IV requirements have focused on factors directly related to controlling sulfur dioxide (SO{sub 2}) emissions. However, utilities must meet a number of additional environmental requirements at the same tune they comply with the acid rain program. To illuminate the potential synergies and conflicts that might exist between the other regulatory mandates and the acid rain program, a thorough examination of all the various programs and their interrelationships must be conducted. This paper reviews the environmental mandates that utilities will have to plan to meet in the next decade concurrently with the acid rain program, and it analyzes the interactions among the various programs to identify potential synergies and conflicts.

  14. Policy Flash 2014-35 Rescission of American Recovery and Reinvestment...

    Energy Savers [EERE]

    Policy Flash 2014-35 Rescission of American Recovery and Reinvestment Act Reporting Requirements. Policy Flash 2014-35 Rescission of American Recovery and Reinvestment Act...

  15. Statement of Patricia Hoffman Acting Assistant Secretary for...

    Energy Savers [EERE]

    U.S. House of Representatives, July 23, 2009. The Energy Independence and Security Act of 2007 (EISA) and the American Recovery and Reinvestment Act of 2009 (Recovery Act)...

  16. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for Fiscal Year 2011 (October 2010-September 2011)

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2012-01-18

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): (1) CAU 90, Area 2 Bitcutter Containment; (2) CAU 91, Area 3 U-3fi Injection Well; (3) CAU 92, Area 6 Decon Pond Facility; (4) CAU 110, Area 3 WMD U-3ax/bl Crater; and (5) CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2011 (October 2010-September 2011). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the inspections are included in Appendix C. It is recommended to continue semiannual inspections at CAUs 90 and 91; quarterly inspections at CAUs 92, 110, and 112; and additional inspections at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. At CAU 92, it is recommended to remove the wave barriers, as they have not proven to be necessary to protect the cover. At CAU 110, it is recommended to continue annual vegetation monitoring and soil moisture monitoring, and to reduce the frequency of subsidence surveys from twice per year to once every other year (biennially).

  17. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    SciTech Connect (OSTI)

    Silvas, Alissa J.

    2015-01-14

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): • CAU 90, Area 2 Bitcutter Containment • CAU 91, Area 3 U-3fi Injection Well • CAU 92, Area 6 Decon Pond Facility • CAU 110, Area 3 WMD U-3ax/bl Crater • CAU 111, Area 5 WMD Retired Mixed Waste Pits • CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

  18. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 1001 13:30 13:37 Wallace, Greg Amplitude Modulation of LH...

  19. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim Polarimetry Validation Diagnostic...

  20. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Present Fiscal Year Scheduled User Hours User Beam Available hours User beam Availability (%) Total Faults Mean Time to Recovery Faults Per Day of Delivered Beam Delivered...

  1. 2009 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Environmental Stewardship Group

    2010-11-01

    For reporting year 2009, Los Alamos National Laboratory (LANL) submitted a Form R report for lead as required under the Emergency Planning and Community Right-to- Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2009 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2009, as well as to provide background information about data included on the Form R reports.

  2. What every designated representative should know about Title IV and Title V enforcement provisions

    SciTech Connect (OSTI)

    Bischoff, C.A. [Gallagher and Kennedy, Phoenix, AZ (United States); Dayal, P. [Tucson Electric Power Co., Tucson, AZ (United States)

    1995-12-31

    Title IV of the Clean Air Act not only created a regulatory program unlike any other under the Clean Air Act, but also established a unique position--the designated representative--as an integral part of the program. The designated representative is required to meet certain basic obligations under Title IV, and a panoply of enforcement mechanisms are available to EPA in the event of noncompliance with these obligations. Also, because a designated representative may take on responsibilities under the permit provisions of Title V of the Clean Air Act, the designated representative can also be subject to an enforcement action for failure to comply with certain Title V permit requirements. This paper considers the basic definition of the designated representative under EPA`s Title IV and Title V regulations, identifies the responsibilities assigned to the designated representative, and then analyzes the enforcement mechanisms that may be applied to the designated representative if a regulatory responsibility has not been satisfied.

  3. G Subject: Implementation of Division D, Titles III and V, and...

    Broader source: Energy.gov (indexed) [DOE]

    and Further Continuing Appropriations Act, 2015, Pub. L. No. 113-235. References: Consolidated and Further Continuing Division D, Title III, Sections Appropriations Act, 2015,...

  4. P.L. 102-486, "Energy Policy Act of 1992", 1992

    SciTech Connect (OSTI)

    1992-10-05

    The Energy Policy Act of 1992 established numerous requirements for industrial efficiency, including those listed under Title I, Subtitle D, and several sections under Title XXI.

  5. Title 50 CFR 402 Interagency Cooperation - Endangered Species...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 50 CFR 402 Interagency Cooperation - Endangered Species Act of 1973, as...

  6. Title 32 CFR 775 Procedures for Implementing the National Environmenta...

    Open Energy Info (EERE)

    Title 32 CFR 775 Procedures for Implementing the National Environmental Policy Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal...

  7. RECOVERY ACT: DYNAMIC ENERGY CONSUMPTION MANAGEMENT OF ROUTING TELECOM AND DATA CENTERS THROUGH REAL-TIME OPTIMAL CONTROL (RTOC): Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Ron Moon

    2011-06-30

    This final scientific report documents the Industrial Technology Program (ITP) Stage 2 Concept Development effort on Data Center Energy Reduction and Management Through Real-Time Optimal Control (RTOC). Society is becoming increasingly dependent on information technology systems, driving exponential growth in demand for data center processing and an insatiable appetite for energy. David Raths noted, 'A 50,000-square-foot data center uses approximately 4 megawatts of power, or the equivalent of 57 barrels of oil a day1.' The problem has become so severe that in some cases, users are giving up raw performance for a better balance between performance and energy efficiency. Historically, power systems for data centers were crudely sized to meet maximum demand. Since many servers operate at 60%-90% of maximum power while only utilizing an average of 5% to 15% of their capability, there are huge inefficiencies in the consumption and delivery of power in these data centers. The goal of the 'Recovery Act: Decreasing Data Center Energy Use through Network and Infrastructure Control' is to develop a state of the art approach for autonomously and intelligently reducing and managing data center power through real-time optimal control. Advances in microelectronics and software are enabling the opportunity to realize significant data center power savings through the implementation of autonomous power management control algorithms. The first step to realizing these savings was addressed in this study through the successful creation of a flexible and scalable mathematical model (equation) for data center behavior and the formulation of an acceptable low technical risk market introduction strategy leveraging commercial hardware and software familiar to the data center market. Follow-on Stage 3 Concept Development efforts include predictive modeling and simulation of algorithm performance, prototype demonstrations with representative data center equipment to verify requisite performance and continued commercial partnering agreement formation to ensure uninterrupted development, and deployment of the real-time optimal control algorithm. As a software implementable technique for reducing power consumption, the RTOC has two very desirable traits supporting rapid prototyping and ultimately widespread dissemination. First, very little capital is required for implementation. No major infrastructure modifications are required and there is no need to purchase expensive capital equipment. Second, the RTOC can be rolled out incrementally. Therefore, the effectiveness can be proven without a large scale initial roll out. Through the use of the Impact Projections Model provided by the DOE, monetary savings in excess of $100M in 2020 and billions by 2040 are predicted. In terms of energy savings, the model predicts a primary energy displacement of 260 trillion BTUs (33 trillion kWh), or a 50% reduction in server power consumption. The model also predicts a corresponding reduction of pollutants such as SO2 and NOx in excess of 100,000 metric tonnes assuming the RTOC is fully deployed. While additional development and prototyping is required to validate these predictions, the relative low cost and ease of implementation compared to large capital projects makes it an ideal candidate for further investigation.

  8. The Nuclear Waste Policy Act, as amended with appropriations acts appended

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Nuclear Waste Policy Act of 1982 provides for the development of repositories for the disposal of high-level radioactive waste and spent nuclear fuel, to establish a program of research, development and demonstration regarding the disposal of high-level radioactive waste and spent nuclear fuel. Titles 1 and 2 cover these subjects. Also included in this Act are: Title 3: Other provisions relating to radioactive waste; Title 4: Nuclear waste negotiation; Title 5: Nuclear waste technical review board; and Title 6: High-level radioactive waste. An appendix contains excerpts from appropriations acts from fiscal year 1984--1994.

  9. 2004 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    M. Stockton

    2006-01-15

    Section 313 of Emergency Planning and Community Right-to-Know Act (EPCRA) specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. For reporting year 2004, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead compounds, nitric acid, and nitrate compounds as required under the EPCRA Section 313. No other EPCRA Section 313 chemicals were used in 2004 above the reportable thresholds. This document provides a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2004, as well as background information about data included on the Form R reports.

  10. --No Title--

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Battelle aids Norris school's fire recovery Listen to the audio OAK RIDGE, Tenn., Dec. 12, 2008 - OAK RIDGE, Tenn., Dec. 12, 2008 -- UT-Battelle has chipped in to help Norris...

  11. 2002 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    M. Stockton

    2003-11-01

    For reporting year 2002, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead compounds and mercury as required under the Emergency Planning and Community Right-to-Know Act (EPCRA), Section 313. No other EPCRA Section 313 chemicals were used in 2002 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical usage and threshold determinations for LANL for calendar year 2002 as well as provide background information about the data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999 EPA promulgated a final rule on Persistent Bioaccumulative Toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable under EPCRA Section 313. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R.

  12. 2008 Toxic Chemical Release Inventory 2008 Toxic Chemical Release Inventory Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Ecology and Air Quality Group

    2009-10-01

    For reporting year 2008, Los Alamos National Laboratory (LANL) submitted a Form R report for lead as required under the Emergency Planning and Community Right-to- Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2008 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2008, as well as to provide background information about data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999, EPA promulgated a final rule on persistent bioaccumulative toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R.

  13. 2006 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

    SciTech Connect (OSTI)

    Ecology and Air Quality Group (ENV-EAQ)

    2007-12-12

    For reporting year 2006, Los Alamos National Laboratory (LANL or the Laboratory) submitted Form R reports for lead as required under the Emergency Planning and Community Right-to-Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2006 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2006, as well as to provide background information about data included on the Form R reports. Section 313 of EPCRA specifically requires facilities to submit a Toxic Chemical Release Inventory Report (Form R) to the U.S. Environmental Protection Agency (EPA) and state agencies if the owners and operators manufacture, process, or otherwise use any of the listed toxic chemicals above listed threshold quantities. EPA compiles this data in the Toxic Release Inventory database. Form R reports for each chemical over threshold quantities must be submitted on or before July 1 each year and must cover activities that occurred at the facility during the previous year. In 1999, EPA promulgated a final rule on persistent bioaccumulative toxics (PBTs). This rule added several chemicals to the EPCRA Section 313 list of toxic chemicals and established lower reporting thresholds for these and other PBT chemicals that were already reportable. These lower thresholds became applicable in reporting year 2000. In 2001, EPA expanded the PBT rule to include a lower reporting threshold for lead and lead compounds. Facilities that manufacture, process, or otherwise use more than 100 lb of lead or lead compounds must submit a Form R.

  14. RECOVERY ACT CASE STUDY CHP and district energy serve Texas A&M's 5,200-acre campus, which includes 750 buildings.

    E-Print Network [OSTI]

    .S. Congressman Chet Edwards Texas A&M's CHP system includes a gas turbine generator, heat recovery steam generator, and steam turbine generator. Photo courtesy of Texas A&M University 3 Riley, Jim, "Combined Heat, 2010. Brush Generator 34 MW RO Water Dresser Rand Steam Turbine Ideal Generator 11 MW 12.47 kV EIT HRSG

  15. Title III hazardous air pollutants

    SciTech Connect (OSTI)

    Todd, R.

    1995-12-31

    The author presents an overview of the key provisions of Title III of the Clean Air Act Amendments of 1990. The key provisions include the following: 112(b) -- 189 Hazardous Air Pollutants (HAP); 112(a) -- Major Source: 10 TPY/25 TPY; 112(d) -- Application of MACT; 112(g) -- Modifications; 112(I) -- State Program; 112(j) -- The Hammer; and 112(r) -- Accidental Release Provisions.

  16. The Department of Energy's American Recovery and Reinvestment Act-Missouri State Energy Program, OAS-RA-L-12-06

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaics »TanklessResearchEnergy2FallDepartmentAmerican Recovery

  17. Experience in automating the Title V permit application

    SciTech Connect (OSTI)

    Ashcraft, T. [Warren Petroleum Co., Tulsa, OK (United States); O`Brien, J. [Process Data Control Corp., Dallas, TX (United States)

    1995-12-31

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  18. Power Plant and Industrial Fuel Use Act | Department of Energy

    Office of Environmental Management (EM)

    Power Plant and Industrial Fuel Use Act Power Plant and Industrial Fuel Use Act Self Certifications Title II of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended...

  19. Recovery News Flashes | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    June 7, 2011 Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility Construction of the largest groundwater treatment facility at the Hanford Site...

  20. --No Title--

    Energy Savers [EERE]

    of the Act, which will allow the Department of Energy (DOE) to continue to use other types of agreements, other than grants or contracts, to carry out certain research...

  1. Title FREEDOM OF INFORMATION ACT REQUEST (FOT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With U.S.Week DayDr.Theories81 to 1990 Timeline2 Hewlett-PackardNext[

  2. Title Page

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnicalInformation FederatedInformationTITLE: AUTHOR(S)Patterns,(Journal

  3. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Chapter D, Appendix D1 (conclusion), Revision 3

    SciTech Connect (OSTI)

    Cook, Neville G.W.; Heuze, Francois E.; Miller, Hamish D.S.; Thoms, Robert L.

    1993-03-01

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change.

  4. Implementation plan for Title 40 Code of Federal Regulations Parts 280 and 281; Final rules for underground storage tanks

    SciTech Connect (OSTI)

    Stupka, R.C.

    1989-04-01

    This report presents the schedules and methods required to comply with the newly promulgated Underground Storage Tank (UST) Regulations Title 40 Code of Federal Regulations (CFR) 280 and 281. These rules were promulgated by the US Environmental Protection Agency (EPA) on September 23, 1988, and became effective December 22, 1988. These regulations are required by Subtitle I of the Resource Conservation and Recovery Act of 1976. Their purpose is to protect the groundwater supplies of the United States in the following ways: Closing old tanks; detecting and remediating tank leaks and spills; establishing stringent standards for new tanks; and upgrade of existing tanks to new-tank standards. 3 refs., 5 tabs.

  5. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    SciTech Connect (OSTI)

    Russo, Bryan J.; Chvala, William D.

    2010-09-30

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  6. Integrated Solid Waste Management Act (Nebraska)

    Broader source: Energy.gov [DOE]

    This act affirms the state's support for alternative waste management practices, including waste reduction and resource recovery. Each county and municipality is required to file an integrated...

  7. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter E, Appendix E1, Chapter L, Appendix L1: Volume 12, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility.

  8. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    Recovery Act Multi Objective Optimization Approaches for the Design of Carbon Geological Sequestration Systems Bau Domenico ENVIRONMENTAL SCIENCES The main objective of this...

  9. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect (OSTI)

    Facca, G.; Faler, M.

    1998-12-31

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  10. Presentation Title

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996How toPolycrystalline Thin-FilmAct ProjectsWEA-2012-04PreliminaryOverview

  11. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  12. Facing Title V permit constraints

    SciTech Connect (OSTI)

    Patankar, U.M. [JACA Corp., Fort Washington, PA (United States)

    1995-06-01

    The new Title V operating permit requirement under state regulations pursuant to the 1990 Clean Air Act Amendments will cover every emission source at a facility. These rules will significantly affect an operation by setting minimum compliance requirements, mandating periodic compliance certification, prescribing complex monitoring, record keeping and reporting procedures and making state and EPA approval of routine operational changes necessary through a permit amendment. The main concern with Title V is its effect on the operational flexibility of a facility, and individual emission sources within that facility. Unless properly addressed in a permit document, the term operational flexibility, so freely used by regulators in the context of the Title V program, can turn into a misnomer and the ability to operate as before may be significantly compromised under Title V. True operational flexibility is essential for businesses to respond to real changes in the marketplace. In the age of automation, just-in-time inventories and increased competition, flexibility to operate can mean the difference between growth and stagnation.

  13. Title 43 CFR 46 Implementation of the National Environmental...

    Open Energy Info (EERE)

    Title 43 CFR 46 Implementation of the National Environmental Policy Act of 1969 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal...

  14. Module Handbook Module title

    E-Print Network [OSTI]

    . Students learn about selected topics from inorganic chemistry, biochemistry, materials chemistryModule Handbook Module title Module title in English Credits Degree of compulsion Level Learning Theory of Functional Materials 6 Compulsory Basic A systematic foundation for quantum physics

  15. S. 171: This Act may be cited as the Department of the Environment Act of 1993. Introduced in the Senate of the United States, One Hundred Third Congress, First Session, January 21, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    S. 171 is an act to establish the Department of the Environment, provide for a Bureau of Environmental Statistics and a Presidential Commission on Improving Environmental Protection, and for other purposes. This act is divided into four titles: Title I: Elevation of the Environmental Protection Agency to Cabinet level; Title II: Environmental role of the United States in international organizations to which it belongs; Title III: Establishment of the Commission on Improving Environmental Protection; and Title IV: Effective date.

  16. Implementing the American Recovery and Reinvestment Act

    E-Print Network [OSTI]

    , universities, and other entities for research and development, and industrial energy efficiency projects · Loan and Project Management Golden Field Office Office of Energy Efficiency and Renewable Energy U. S. Department energy, electric power transmission systems, and certain leading-edge biofuel projects · Energy Grant

  17. ARRA521 Recovery Act - Project Daily Report

    Office of Environmental Management (EM)

    Unpaid Balance Argonne National Laboratory 79,000,000 79,000,000 79,000,000 0 Brookhaven National Laboratory 70,810,000 70,809,616 70,809,616 0 Energy Technology...

  18. Recovery Act?Transportation Electrification Education Partnership...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. tiarravt038peng2010...

  19. Recovery Act?Transportation Electrification Education Partnership...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting arravt038tipeng2012...

  20. Recovery Act?Transportation Electrification Education Partnership...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation arravt038tipeng2011p...

  1. Recovery Act Interconnection Transmission Planning | Department...

    Energy Savers [EERE]

    - are identifying transmission requirements under a broad range of alternative electricity futures (including intensive application of demand-side technologies), and...

  2. EM Recovery Act Lessons Learned (Sites)

    Broader source: Energy.gov [DOE]

    Presentation slides from EM ARRA Best Practices and Lessons Learned WorkshopWaste Management SymposiumPhoenix, AZMarch 1, 2012.

  3. Recovery Act Progress Update: HWCTR Tapping

    ScienceCinema (OSTI)

    Tire, Brian

    2012-06-14

    Closure activity at the half-century old heavy water components reactor. Decommissioning is kicked off with the grouting of the basin to further protect the environment from radioactive waste.

  4. Recovery Act Progress at Idaho National Lab

    Office of Energy Efficiency and Renewable Energy (EERE)

    North Wind Services will be constructing several new structures at the INL Radioactive Waste Management Complex -- facilities that will provide important protection from the elements and minimize the spread of contamination during buried waste excavation, retrieval and packaging operations.

  5. Recovery Act Workforce Development | Department of Energy

    Energy Savers [EERE]

    in communities across the country. WHAT'S NEW IN WORKFORCE DEVELOPMENT April 2012: Building the Next Generation of Smart Grid Workers Students in Connecticut participated in...

  6. Clean Cities Recovery Act: Vehicle & Infrastructure Deployment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (GA, AL, SC); Centralina Council of Governments (NC) EV Community Readiness projects: South Florida Regional Planning Council; Virginia Department of Mines, Minerals and Energy...

  7. American Reinvestment and Recovery Act of 2009

    E-Print Network [OSTI]

    Grishok, Alla

    by the ARRA also carries enhanced accountability and transparency. ­ Grantees must fulfill detailed quarterly unique "P" accounts for all grantees receiving ARRA funds. (Regular NIH appropriation $$$ flows to "G" accounts for all grantees) · "P" accounts do not permit cash pooling · Grantees will be required to request

  8. Ohio Celebrates Recovery Act Weatherization Program Performance...

    Energy Savers [EERE]

    to work, but ... here in Ohio, we are positioning ourselves to be at the front of this wave of the new energy economy." The Carrs' home was weatherized by LEADS Community Action...

  9. EM American Recovery and Reinvestment Act Update

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallengesOhio andTechnologiesLand

  10. ARRA521 Recovery Act - Project Daily Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel Travel ThePresidentialofSubsurfacetoDepartmentEnergy

  11. OE Recovery Act Blog | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News enDepartment ofProgramSeptember 5,May 23,blog

  12. OE Recovery Act Blog | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News enDepartment ofProgramSeptember 5,May 23,blog13,

  13. OE Recovery Act Blog | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News enDepartment ofProgramSeptember 5,May 23,blog13,June

  14. OE Recovery Act Blog | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News enDepartment ofProgramSeptember 5,May

  15. OE Recovery Act News | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOEDepartmentNew2008Group, Inc. Order(National4, 2014 FY 2015news

  16. OE Recovery Act News | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOEDepartmentNew2008Group, Inc. Order(National4, 2014 FY 2015newsApril

  17. OpenEI Community - recovery act

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly Smart Grid Data available for downloadGRR 3rd Quarter -

  18. EM Recovery Act Performance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatementof EnergyQuality Assurance ProgramJohnson)EM

  19. State Energy Program Recovery Act Evaluation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVESDepartmentSpecialCode ofDepartment of of a major national

  20. OE Recovery Act News | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties -DepartmentAvailable forSite |n t78 I.(National RenewableElectric

  1. LANL exceeds Early Recovery Act recycling goals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource and Job Event In Espanola CommunityExcavationLANL

  2. LANL sponsors Recovery Act Job Fair

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate student Subtask2 J.N.open to badgeLANL

  3. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate student Subtask22Background AboutVentureFive R&DLANL

  4. OE Recovery Act Blog | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof EnergyApril 2014Department ofWind CareerEnergyOE Leadership

  5. Recovery Act Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment of EnergyFebruary

  6. Recovery Act Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment of

  7. Recovery Act Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugust 25, 2011 Audit

  8. Recovery Act Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugust 25, 2011

  9. Recovery Act Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugust 25,

  10. Recovery Act SGDP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugust 25,Information

  11. Recovery Act Workforce Development | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow YourDepartment ofAugust

  12. Lab completes Recovery Act-funded demolition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource andfirstDeviceLab captures five

  13. Recovery | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) by Carbon-RichProtonAbout Us Hanford SiteRecovery Act »Recovery Act

  14. Wetland Conservation The Food Security Act was enacted on

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Wetland Conservation Compliance #12;The Food Security Act was enacted on December 23, 1985. Title. · Developed to streamline wetland delineation process and promote consistency between the Clean Water Act and the Food Security Act. #12;1994 National Food Security Act Manual Procedures · Provided NRCS staff policy

  15. Grant Guidance to Administer the American Recovery and Reinvestment...

    Broader source: Energy.gov (indexed) [DOE]

    PROGRAM NOTICE 10-10: REPROGRAMMING TRAINING AND TECHNICAL ASSISTANCE FUNDS TO PROGRAM OPERATIONS Weatherization Formula Grants - American Recovery and Reinvestment Act (ARRA)...

  16. The preparation for and survival of an EPA Title IV and Title V facility audit

    SciTech Connect (OSTI)

    Facca, G.L.; Faler, M.

    1999-07-01

    As part of the 1990 Clean Air Act Amendments, major facilities are required to obtain federally enforceable operating permits (Title V). In a separate permitting action, the electric utilities with units generating more then 25 megawatts are required to obtain permits for NO{sub x} and SO{sub x}, the emissions which contribute to acid rain (Title IV). The Title IV permit is included as part of the Title V permit. This paper will use an actual audit experience at a coal fired generation facility as a case study for the preparation for and outcome of an EPA Title IV Level 3 audit. The paper will document the procedures for preparation, the audit process, and the outcome. The audit is part of the EPA's process for review of the record keeping and instrument calibration methods outlined in Title IV. Both types of permits have many different record keeping and monitoring requirements as well as separate reporting requirements which are submitted to both federal; state and local regulatory agencies for review and evaluation. Title IV units include very specific instrument calibration/audit requirements, and Title V has compliance testing and monitoring requirements. Alliant Power was notified in August 1998 of the intent of EPA Region VII to conduct a Level 3 audit at the Lansing Generation Station. The US EPA and the State of Iowa intended to review all Title IV record keeping (Level 1), continuous emission monitoring calibrations and linearity testing (Level 2) and observe the annual Relative Accuracy Testing Audit performed by an outside contractor. In addition, during this facility site visit, the compliance with Title V permit requirements was also audited.

  17. Road to Recovery: Bringing Recovery to Small Town America

    ScienceCinema (OSTI)

    Nettamo, Paivi

    2012-06-14

    The Recovery Act hits the road to reach out to surrounding towns of the Savannah River Site that are struggling with soaring unemployment rates. This project helps recruit thousands of people to new jobs in environmental cleanup at the Savannah River Site.

  18. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    SciTech Connect (OSTI)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.

  19. Power Recovery 

    E-Print Network [OSTI]

    Murray, F.

    1986-01-01

    , will be the use of the ASTM Theoretical Steam Rate Tables. In addition, the author's experience regarding the minimum size for power recovery units that are economic in a Culf Coast plant will be presented. INTROD\\Jr.'rION When surveying an operation...)' The pressure ~ecompression term(~2) k~l, is used in the equat10n in a manner 1 which reduces the power recovery as calculated by the first term of the equation. From a practical view a decompression ra~~y ~0.3 is a good screening point. Note...

  20. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    Recovery Act: Multi-Objective Optimization Approaches for the Design of Carbon Geological Sequestration Systems","Bau, Domenico","2013-05-31T04:00:00Z",1097612,"10.2172...

  1. REHABILITATION AND RECOVERY Rehabillitation and Recovery Following

    E-Print Network [OSTI]

    MacDonald, Lee

    REHABILITATION AND RECOVERY Rehabillitation and Recovery Following Wildfires: A Synthesis1 Lee H rehabilitation techniques applied in the Sierra Nevada, northern California, and southwestern Oregon objectives; and {5) recommend appropriate rehabilitation and recovery measures. Wildfires traditionally have

  2. Title | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitle XVII Final Rule Title XVII FinalTitle

  3. an Recovery and Reinvestment Act of 20091 (Recovery Act) provides protections for cert

    E-Print Network [OSTI]

    ://www.oig.doc. ov/ Fraud, Waste, or Abuse: Suspect It? Report It! Inspector General Hotline 1-800-424-5197 ou know: · · · · · Take ac You can r (800) 424-5197--or emailing hotline@oig.doc. ce of Inspector General at http or General, the Comptroller General, a member of Congress, a state or federal regulatory or law t agency

  4. DOE Policy Re Recovery Act Recipient Use of Recovery Act Logos on Signage |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department ofRefrigeratorsDepartment ofHeat PumpPlan for

  5. Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings

    SciTech Connect (OSTI)

    Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

    1995-12-31

    Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

  6. Two Line Subject Title One Line Title

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnicalInformation FederatedInformationTITLE:Connect Transportation

  7. Title 43 CFR 2800 Rights-of-way Under the Federal Land Policy...

    Open Energy Info (EERE)

    Title 43 CFR 2800 Rights-of-way Under the Federal Land Policy Management Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal...

  8. Title 43 CFR 2800: Rights-of-Way Under the Federal Land Policy...

    Open Energy Info (EERE)

    Title 43 CFR 2800: Rights-of-Way Under the Federal Land Policy Management Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  9. Title V permitting delayed for some non-major sources

    SciTech Connect (OSTI)

    Bassett, S.M.

    1996-03-01

    Some small businesses subject to the Clean Air Act`s maximum achievable control technology (MACT) regulations may be a break from the US Environmental Protection Agency (EPA). While the businesses, considered non-major air-pollutant sources, must still meet all MACT requirements, they are likely to receive a Title V operating permit program deferral. On December 13, 1995, EPA proposed to defer Title V operating permit requirements for non-major sources in the following three industries: decorative chromium electroplating and chromium anodizing; perchloroethylene dry cleaning; ethylene oxide commercial sterilization and fumigation. In addition to describing its reasons for the temporary deferments, EPA sets forth the rationale for permanently exempting certain non-major electroplating and anodizing sources. This rationale may pave the way for small businesses in other industries to escape Title V.

  10. H. R. 5373: An Act making appropriations for energy and water development for the fiscal year ending September 30, 1993, and for other purposes. Introduced in the House of Representatives, One Hundred Second Congress, Second Session, August 3, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This Act may be cited as the [open quotes]Energy and Water Development Appropriations Act, 1993[close quotes]. The purpose of this Act is to make appropriations for energy and water development for the fiscal year ending September 30, 1993, and for other purposes. Title I presents provisions for the Department of Defense--Civil Department of the Army; Title II for the Department of Interior, Bureau of Reclamation; Title III for the Department of Energy; and Title V for General Provisions.

  11. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    SciTech Connect (OSTI)

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  12. Title: Marketing Assistant Description

    E-Print Network [OSTI]

    Schweik, Charles M.

    Title: Marketing Assistant Description: The UMass Amherst Career Services Office is searching for a student interested in marketing. The Marketing Assistant will work closely with our in-office marketing Brainstorm new and exciting marketing strategies, including social media Participate and contribute

  13. Rank Journal title Eigenfactor

    E-Print Network [OSTI]

    Rank Journal title 2014 Total Cites 2014 Impact Factor 5-Year Impact Factor Immediacy Index 2013 Articles Cited Half-life Eigenfactor® Score Article Influence® Score 1 JOURNAL OF ECONOMIC LITERATURE 5861 ACADEMY OF MANAGEMENT JOURNAL 22351 6.448 9.812 0.653 72 >10.0 0.02813 5.738 5 QUARTERLY JOURNAL

  14. Rank Journal title Eigenfactor

    E-Print Network [OSTI]

    Rank Journal title 2013 Total Cites 2013 Impact Factor 5-Year Impact Factor Immediacy Index 2013 Articles Cited Half-life Eigenfactor® Score Article Influence® Score 1 JOURNAL OF ECONOMIC LITERATURE 5479 JOURNAL OF ECONOMICS 16827 5.966 9.126 0.775 40 >10.0 0.05316 14.78 5 ACADEMY OF MANAGEMENT JOURNAL 19426

  15. Journal title 2010 Impact

    E-Print Network [OSTI]

    Ferrara, Emilio

    Journal title 2010 Impact Factor Information Sciences 2.833 Web Semantics 2.789 Artificial Intelligence 2.511 Future Generation Computer Systems 2.365 International Journal of Medical Informatics 2.244 Applied Soft Computing Journal 2.084 Expert Systems With Applications 1.924 Fuzzy Sets And Systems 1

  16. Study Title: Principal Investigator

    E-Print Network [OSTI]

    Biederman, Irving

    Study Title: Principal Investigator: EXPERIMENTAL SUBJECT'S BILL OF RIGHTS You have been asked BE INFORMED ABOUT: 1. The nature and purpose of the study. 2. The procedures in the study and any drug or device to be used. 3. Discomforts and risks reasonably to be expected from the study. 4. Benefits

  17. WORKING TITLES GUIDELINES HUMAN RESOURCES

    E-Print Network [OSTI]

    Su, Xiao

    titles for staff indicate an employee's functional responsibility, particularly when the classification are commonly used on business cards and in directories and in other correspondence with constituents the classification title. B. Working titles may be used to better communicate an employee's area of responsibility

  18. RESEARCH TITLE SUMMARY AUGUST 2013

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    1 RESEARCH TITLE SUMMARY AUGUST 2013 There are various research titles that can be used when appointing individuals engaged only with research (e.g. when no teaching duties are assigned). Please consult with Humanities AHR staff if you are contemplating grant proposals that will utilize research titles to assure

  19. JOB AND POSITION TITLE LIST VERSION 2 Classification Project 2000 Job Title Position Title EEO

    E-Print Network [OSTI]

    Cui, Yan

    JOB AND POSITION TITLE LIST VERSION 2 Classification Project 2000 Job Title Position Title EEO Administrative Supervisor II Housing Supervisor 41 Library Supervisor I Library Departmental Supervisor 41 Library Supervisor III Library Supervisor 41 Administrative Support Supervisor II Mail Services Supervisor

  20. Compliance under the Community Right-to-Know Act

    SciTech Connect (OSTI)

    Bradford, J.R.; Vaughn, R.C.; Breazeale, A. [Compliance Services Group, Inc., Lubbock, TX (United States)

    1995-12-31

    In 1986, the Superfund Amendments and Reauthorization Act (SARA) provided additional funding to continue and greatly expand the cleanup program begun under CERCLA. Title III of SARA contains the provisions of the Emergency Planning and Community Right-to-Know Act (EPCRA). SARA Title III may prove to be more pervasive and more demanding for industry than any of the other many rules and regulations promulgated by the Environmental Protection Agency. The Emergency Planning and Community Right-to-Know Act has four major provisions: planning for chemical emergencies; emergency notification of chemical accidents and releases; reporting of hazardous chemical inventories; and toxic chemical release reporting.

  1. UTILIZATION OF TWO-STAGE SINGLE-PASS ELECTROFISHING TO ESTIMATE ABUNDANCE AND DEVELOP RECOVERY-MONITORING

    E-Print Network [OSTI]

    UTILIZATION OF TWO-STAGE SINGLE-PASS ELECTROFISHING TO ESTIMATE ABUNDANCE AND DEVELOP RECOVERY Management (Planning) Title of Thesis: Utilization of two-stage single-pass electrofishing to estimate

  2. Title 10 CFR 1021 National Environmental Policy Act Implementing Procedures

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)Open EnergyTinox Jump to: navigation,TirSection 2809 | Open|

  3. Title 44 Alaska Statutes Chapter 62 - Administrative Procedure Act | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)Open EnergyTinoxOpen EnergyInformationEnergy Information

  4. Title III of the Omnibus Appropriations Act | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyThe U.S.Laclede GasEfficiency| Department of Energy TheMeeks

  5. Title III of the Defense Production Act | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings for Specific2HeldTidalTimothyOilBradITitle III

  6. TITLE48CHAPTER9

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report15 Meeting StateOctoberSustainableFAQS TITLE XVIITITLE XVIITITLE

  7. Heat recovery in building envelopes

    E-Print Network [OSTI]

    Walker, Iain S.; Sherman, Max H.

    2003-01-01

    2003). Infiltration heat recovery – ASHRAE Research ProjectModel for Infiltration Heat Recovery, Proc. 21 st AnnualN ATIONAL L ABORATORY Heat Recovery in Building Envelopes

  8. Heat Recovery in Building Envelopes

    E-Print Network [OSTI]

    Sherman, Max H.; Walker, Iain S.

    2001-01-01

    Model For Infiltration Heat Recovery. Proceedings 21st AivcLBNL 47329 HEAT RECOVERY IN BUILDING ENVELOPES Max H.contribution because of heat recovery within the building

  9. Heat recovery in building envelopes

    E-Print Network [OSTI]

    Walker, Iain S.; Sherman, Max H.

    2003-01-01

    2003). Infiltration heat recovery – ASHRAE Research ProjectModel for Infiltration Heat Recovery, Proc. 21 st AnnualWalker, I.S. (2001). "Heat Recovery in Building Envelopes".

  10. Title: Author(s):

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnicalInformation FederatedInformationTITLE: AUTHOR(S)Patterns,(Journal A uttwr(s):

  11. Locating Heat Recovery Opportunities 

    E-Print Network [OSTI]

    Waterland, A. F.

    1981-01-01

    Basic concepts of heat recovery are defined as they apply to the industrial community. Methods for locating, ranking, and developing heat recovery opportunities are presented and explained. The needs for useful heat 'sinks' are emphasized as equal...

  12. EOC Title: Hazardous Materials Liaison (Emergency Support Function #10) Coordinating Campus Unit: EH&S

    E-Print Network [OSTI]

    Walker, Matthew P.

    OPERATIONS EOC Title: Hazardous Materials Liaison (Emergency Support Function #10) Coordinating Campus Unit: EH&S General Description The Hazardous Materials Emergency Support Function coordinates response to and recovery from an actual or potential discharge and/or release of a hazardous material

  13. Project Title: Prisoner Counselling Effectiveness

    E-Print Network [OSTI]

    Hickman, Mark

    : Martin Visser, John George Academic Supervisor: Andrew Frost Project Reference Number: S112/PrisonersTrustProject Title: Prisoner Counselling Effectiveness Bachelor of Arts Internship Company/Organization: The Counselling Service for Prisoners Trust Intern Position Title: Methodology Evaluator Organisation Supervisor

  14. Real promise or false hope: DOE's title XVII loan Guarantee

    SciTech Connect (OSTI)

    Massouh, Jennifer F.; Cannon, George D. Jr.; Logan, Suzanne M.; Schwartz, David L.

    2009-05-15

    While the American Recovery and Reinvestment Act of 2009 expanded the DOE loan guarantee program to include certain ''shovel-ready'' projects, and appropriated $6 billion to cover the credit subsidy cost associated with these projects, it failed to resolve some of the most pressing problems facing the program. Here are some recommendations that may finally get some shovels in the ground. (author)

  15. Radiation Protection Act (Pennsylvania)

    Broader source: Energy.gov [DOE]

    This Act combines the radiation safety provisions of The Atomic Energy Development and Radiation Control Act and the Environmental Radiation Protection Act, and empowers the Department of...

  16. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T. [ERM-Southwest, Inc., Houston, TX (United States)

    1995-12-31

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  17. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ď?· Create a Showcase Waste Heat Recovery Demonstration Project.

  18. Interactions Between Energy Efficiecy Programs Funded Under Recover Act and Utility Customer-funded Energy Efficiency Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    This webinar covered utility customer-funded and Recovery Act-funded energy efficiency programs, results of analysis in 12 case study states, and case study examples.

  19. Impacts of Title IV in Maryland

    SciTech Connect (OSTI)

    Sherwell, J. [Dept. of Natural Resources, Annapolis, MD (United States); Ellis, H. [Johns Hopkins Univ., Baltimore, MD (United States); Corio, L.; Seinfelt, J. [Versar, Inc., Columbia, MD (United States)

    1995-12-31

    The Maryland Department of Natural Resources` Power Plant Research Program has evaluated the environmental effects of acid deposition on Maryland`s air, land, water (especially the Chesapeake Bay), and human resources since the mid-1980`s. Title IV of the Clean Air Act Amendments of 1990 (CAAA90) has focused much attention on the mandated reductions of nitrogen oxides (NO{sub x}) and sulfur dioxide (SO{sub 2}) to control acid deposition. Baseline data on acidic deposition and air emissions/pollution control for NO{sub x} and SO{sub 2} acquired through PPRP studies have proved useful in evaluating the impacts of Title IV on Maryland power plants and resources. Three example programs are discussed: The first is an evaluation of SO{sub 2} emissions on ecosystems through the use of critical loads--the amount of acid rain that an ecosystem can tolerate without continuing to acidify. Results support the use of broadly based emissions trading scenarios: The second study is an evaluation of the potential for reducing nitrate loading in the Chesapeake Bay by reducing NO{sub x} emissions. Results indicate substantial NO{sub x} emission reductions could offer significant reductions in nitrate deposition to the Bay: The final study is a review of the impacts of Title IV on the Maryland coal industry and the prospects for coal cleaning and advanced combustion technologies. Current results indicate that Maryland coal will meet Phase 2 SO{sub 2} emission standards using advanced combustion techniques, such as fluidized bed technologies, but that additional emissions controls, such as a scrubber would be required in a conventional boiler.

  20. S. 2166: An act to reduce the Nation's dependence on imported oil, to provide for the energy security of the Nation, and for other purposes, introduced in the United States Senate and House of Representatives, One Hundred Second Congress, Second Session, February 19, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    This bill, also referred to as the National Energy Security Act of 1992, contains the following: Title I - Findings and purposes: Climate protection goals,least-cost energy strategy, and Director of climate protection: Title II - Definitions; Title III (none); Title IV - Fleets and alternative fuels: Alternative fuel fleets, Alternative fuels, Mass transit and training; Title V - Renewable energy: CORECT and COEECT, Renewable energy initiatives, Hydropower; Title VI - Energy efficiency: Industrial, commercial, and residential, Federal energy management, Utilities, State, local, insular, and tribal energy assistance, LIHEAP options pilot program, Consultative commission on western hemisphere energy and environment; Title VII (none); Title VIII - Advanced nuclear reactor commercialization; Title IX - Nuclear reactor licensing; Title X - Uranium: Uranium enrichment, Uranium; Title XI - Natural gas; Title XII - Outer continental shelf: Coastal communities impact assistance, Coastal resources enhancement fund, relationship to other law, Prohibition of leasing and preleasing activity; Title XIII - Research, development, demonstration and commercialization activities; Title XIV - Coal and coal technology, Electricity, Innovative technology transfer; Title XV - Public Utility Holding Company Act reform; Title XVI - Strategic Petroleum Reserve; Title XVII - Stratospheric ozone depletion; Title XVIII - Indian energy resource development commission; Title XIX - General provisions.

  1. Estuary Restoration Act of 2000 Title I of Estuaries and Clean Waters Act of 2000

    E-Print Network [OSTI]

    US Army Corps of Engineers

    project information. The U.S. Army Corps of Engineers received $200,000 for Fiscal Year 2002 to use for fiscal years 2001 through 2005, to remain available until expended. Additionally, $1 in each of fiscal years 2001 through 2005, for the acquisition, maintenance, and management of restoration

  2. Appendix C: Cost of Climate Policy and the Waxman-Markey American Clean Energy and Security Act of 2009 (H.R. 2454)1

    E-Print Network [OSTI]

    Appendix C: Cost of Climate Policy and the Waxman-Markey American Clean Energy and Security Act The American Clean Energy and Security Act (H.R.2454) passed the House of Representatives after the completion version. H.R. 2454 is composed of five main titles. Title I deals with clean energy, setting up a combined

  3. National Ignition Facility Title II Design Plan

    SciTech Connect (OSTI)

    Kumpan, S

    1997-03-01

    This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

  4. Project Title: Earthquake Documentary Interviews

    E-Print Network [OSTI]

    Hickman, Mark

    Project Title: Earthquake Documentary Interviews Bachelor of Arts Internship Company: Chris Thomson Academic Adviser: Mary Wiles Project Reference Number: S112/CEISMIC/29/NP - Earthquake collected on the earthquake, its survivors and their stories. This project is unique

  5. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  6. Administration Policy Complete Policy Title

    E-Print Network [OSTI]

    Thompson, Michael

    Administration Policy Complete Policy Title: Office of Legal Services & Access to External Legal Responsible Executive: Vice-President (Administration) Enquiries: University Secretariat DISCLAIMER for retention of external counsel for University legal matters; and · the administrative and financial oversight

  7. Administration Policy Complete Policy Title

    E-Print Network [OSTI]

    Hitchcock, Adam P.

    Administration Policy Complete Policy Title: Financial Accountability Policy for Student Organizations that receive Fee Remittances from the University Policy Number: Approved by: Associate Vice Recent Approval: November 2013 Date of Original Approval: Supersedes/Amends Policy dated: Guidelines

  8. Waste Heat Recovery

    Office of Environmental Management (EM)

    DRAFT - PRE-DECISIONAL - DRAFT 1 Waste Heat Recovery 1 Technology Assessment 2 Contents 3 1. Introduction to the TechnologySystem ......

  9. Recovery processes for precious metals. (Latest citations from Pollution abstracts). Published Search

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The bibliography contains citations concerning the recovery and recycling of gold, silver, and other precious metals from industrial wastes. Procedures adapted to electroplating baths, anode sludges, mine tailings, electronic scrap, and photographic processing effluent are considered. Techniques are described, including precipitation, microbial leaching, ultrafiltration, and electrochemical processes. The citations examine the efficiency, operational difficulties, cost effectiveness, and optimization of specific precious metal recovery methods. (Contains a minimum of 62 citations and includes a subject term index and title list.)

  10. WIPP Recovery Information | Department of Energy

    Office of Environmental Management (EM)

    WIPP Recovery Information WIPP Recovery Information Topic: J. R. Stroble CBFO, Provided Information on Locations to Access WIPP Recovery Information. WIPP Recovery - March 26, 2014...

  11. Mass and Heat Recovery 

    E-Print Network [OSTI]

    Hindawai, S. M.

    2010-01-01

    In the last few years heat recovery was under spot and in air conditioning fields usually we use heat recovery by different types of heat exchangers. The heat exchanging between the exhaust air from the building with the fresh air to the building...

  12. Recovery Boiler Corrosion Chemistry

    E-Print Network [OSTI]

    Das, Suman

    11/13/2014 1 Recovery Boiler Corrosion Chemistry Sandy Sharp and Honghi Tran Symposium on Corrosion of a recovery boiler each cause their own forms of corrosion and cracking Understanding the origin of the corrosive conditions enables us to operate a boiler so as to minimize corrosion and cracking select

  13. Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravelInformationCollectionGrid Workshop,Delivery andRecordsEnergy

  14. Savannah River Site Removes Dome, Opening Reactor for Recovery Act

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravelInformationCollectionGridRenoRhode IslandPlanSafety

  15. US Recovery Act Smart Grid Energy Storage Demonstration Projects | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York: EnergyU.S. EPA RegionforUS Forest ServiceFuelEnergy

  16. US Recovery Act Smart Grid Projects - Advanced Metering Infrastructure |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York: EnergyU.S. EPA RegionforUS Forest

  17. Recovery Act: Oxy-Combustion Technology Development for Industrial...

    Office of Scientific and Technical Information (OSTI)

    Testing in Alstom's 15 MWth Boiler Simulation Facility Levasseur, Armand 01 COAL, LIGNITE, AND PEAT; 54 ENVIRONMENTAL SCIENCES Clean Coal Technology; Coal-Fuels;...

  18. Recovery Act: Geologic Sequestration Training and Research Walsh...

    Office of Scientific and Technical Information (OSTI)

    simulation, and (6) development of an advanced undergraduategraduate level course on coal combustion and gasification, climate change, and carbon sequestration. Four graduate...

  19. Faces of the Recovery Act: National Weatherization Conference

    ScienceCinema (OSTI)

    Chu, Sammy; Campanella, Leslie; Sewell, Travis; Gill, Tony; Fransen, Richard; Leuty, Steve; Qualls, Xavier; Bergeron, T.J.; Stewet, Zachary

    2013-05-29

    Personal stories from the 2009 National Weatherization Training Conference in Indianapolis, Indiana.

  20. Secretary Chu Highlights Recovery Act Tax Credits for Home Energy...

    Office of Environmental Management (EM)

    ventilation and air conditioning equipment, adding insulation, or replacing a water heater. Through 2010, homeowners can receive a tax credit for 30 percent of the cost of the...

  1. Secretary Chu Announces $93 Million from Recovery Act to Support...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    lower capital costs of wind systems, and maintain a high level of wind energy capacity growth. 14 million for technology development To strengthen its support of the wind...

  2. Treasury, Energy Announce More Than $2 Billion in Recovery Act...

    Broader source: Energy.gov (indexed) [DOE]

    energy, a program that is expected to result in more than 3 billion of stimulus for energy development in rural and urban communities. Media contact(s): DOE Public Affairs:...

  3. Recovery Act Changes Hanford Skyline with Explosive Demolitions...

    Office of Environmental Management (EM)

    explosive demolitions took down two 250-foot-tall exhaust chimneys, two 90-foot-fall air filter structures, and a 140-foot-tall water tower. The water tower was marked by a "Work...

  4. Department of Energy Recovery Act Investment in Biomass Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the nation. Of this funding, 1029 million is supporting innovative work to advance biomass research, development, demonstration, and deployment. arrasummaryfactsheetweb.p...

  5. Treasury, Energy Announce More Than $2 Billion in Recovery Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    will produce solar, wind, and geothermal energy equipment; fuel cells, microturbines, and batteries; electric cars; electric grids to support the transmission of renewable energy;...

  6. Secretary Chu Announces $93 Million from Recovery Act to Support...

    Energy Savers [EERE]

    trimming, grind, painting, materials handling and inspection. 24 million for wind power research and development DOE will provide 24 million for the development of up...

  7. RCRA (Resource Conservation and Recovery Act) final authorization guidance manual

    SciTech Connect (OSTI)

    Not Available

    1983-06-10

    The document provides guidance regarding final authorization of State Hazardous Waste programs for the pre-HSWA RCRA program. The manual establishes a process and schedule for State Authorization applications, and provides detailed guidance on what State programs must contain in order to qualify for final authorization. The primary audience is U.S. EPA Headquarters and Regional offices and also State agencies, but public requests have also been received so they are included in that broad audience.

  8. RCRA (Resource Conservation and Recovery Act) inspection manual. Final report

    SciTech Connect (OSTI)

    Not Available

    1988-04-22

    The RCRA Inspection Manual is intended to assist RCRA field inspectors in their performance of Compliance Evaluation Inspections of RCRA generators, transporters, and treatment, storage, and disposal facilities. Included in the document are inspection procedures for both interim status and permitted facilities. The guidance also provides inspection checklists to aid the inspectors in their review of facility compliance. The Manual will assist RCRA inspectors and enforcement personnel to: conduct RCRA inspections efficiently and professionally, to determine facility compliance with RCRA regulations, adequately prepare for and conduct inspections at RCRA generators, transporters and TSD's, review facility permits for inspection of permitted facilities, and prepare quality inspection reports.

  9. Audit Report: Department of Energy's Controls over Recovery Act...

    Energy Savers [EERE]

    Management (EM) oversees two major contracts for cleaning up the legacy contamination at the Idaho National Laboratory (INL). The 7 year, 2.9 billion contract with...

  10. Energy Secretary Chu Announces $6 Billion in Recovery Act Funding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    complex facilities. "These investments will put Americans to work while cleaning up contamination from the cold war era," said Secretary Chu. "It reflects our commitment to future...

  11. Energy Secretary Chu Announces $148 million in Recovery Act Funding...

    Energy Savers [EERE]

    complex facilities. "These investments will put Americans to work while cleaning up contamination from the cold war era," said Secretary Chu. "It reflects our commitment to future...

  12. Faces of the Recovery Act: National Weatherization Conference

    ScienceCinema (OSTI)

    None

    2010-09-01

    Personal stories from the 2009 National Weatherization Training Conference in Indianapolis, Indiana.

  13. Navy's Geothermal Program Office: Overview of Recovery Act (ARRA...

    Open Energy Info (EERE)

    Centro base in Imperial County, CA, and at the Hawthorne Army Depot, NV. GPO is currently drilling on the west flank of the Chocolate Mountains, Imperial County, CA and have plans...

  14. Federal Energy Management Program Recovery Act Technical Assistance Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) issued a Call for Technical Services in May 2010 to help federal agencies identify and prioritize energy efficiency, water efficiency, and renewable energy projects. Read information about the Call for Technical Services (including technical service opportunities, application process, selection criteria, reporting requirements, and contacts).

  15. Secretary Chu Announces More than $57 Million in Recovery Act...

    Broader source: Energy.gov (indexed) [DOE]

    will focus on implementing distributed resources and creating demand-responsive microgrids to increase reliability and decrease overall energy demand. The project aims to...

  16. Deputy Secretary Poneman: Recovery Act Putting Americans to Work...

    Office of Environmental Management (EM)

    Important Work at Savannah River Site November 4, 2009 - 12:00am Addthis Aiken, South Carolina - At a community breakfast in Aiken, South Carolina today, U.S. Deputy...

  17. Vice President Biden Announces Recovery Act Funding for 37 Transformat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and reduce greenhouse gas emissions. MIT (Cambridge, MA) - Semi-Solid Rechargeable Flow Battery This concept represents a new type of battery that doesn't exist today: a...

  18. Progress Continues Post-Recovery Act Award at Hanford Site

    Office of Environmental Management (EM)

    regulatory mile- stone to demolish the Plutonium Finishing Plant complex by 2016, J.D. Dowell, Assistant Manager for the Central Plateau, DOE Richland Operations Office Progress...

  19. American Reinvestment and Recovery Act § 1553: Protecting State...

    Office of Environmental Management (EM)

    assume the right to a civil remedy The inspector general shall include in semi-annual reports to Congress a list of those investigations the inspector general decided not to...

  20. Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment

    Broader source: Energy.gov [DOE]

    For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a decommissioned nuclear reactor using an innovative treatment...

  1. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup

    Office of Environmental Management (EM)

    Pope, "The EPA is pleased with the cleanup of hot spots of contaminated soil and sediment along Lower Three Runs. EPA worked closely with the Department of Energy, South...

  2. Recovery Act: Local Energy Assurance Planning Initiatives | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    will help ensure local governments can recover and restore power quickly following any energy supply disruptions. PRESS RELEASES February 19, 2010 Secretary Chu Announces Over...

  3. Recovery Act: Enhancing State Energy Assurance | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    States are using these funds to plan for energy supply disruption risks and vulnerabilities to lessen the devastating impact that such incidents can have on the economy and the...

  4. Recovery Act Provides Big Boost with a Nanoscale Focus | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    House to Focus on Programmatic Successes Achieved Under ARRA Funding An operator uses robotic manipulators to process RH TRU. WASTE DISPOSITION PROJECT MAKES GREAT STRIDES AT THE...

  5. Recovery Act: Low-Cost, Highly Lambertian Reflector Composite...

    Office of Scientific and Technical Information (OSTI)

    Reflector Composite For Improved LED Fixture Efficiency and Lifetime Teather, Eric 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 36 MATERIALS SCIENCE The overall...

  6. Energy Secretary Chu Announces $138 Million in Recovery Act Funding...

    Energy Savers [EERE]

    in Ohio. Projects identified for funding will focus on accelerating cleanup of soil and groundwater, transportation and disposal of waste, and cleaning and demolishing...

  7. Energy Secretary Chu Announces $384 Million in Recovery Act Funding...

    Energy Savers [EERE]

    in New Mexico. Projects identified for funding will focus on accelerating cleanup of soil and groundwater, transportation and disposal of waste, and cleaning and demolishing...

  8. Energy Department Announces Major Recovery Act Milestone: 600...

    Office of Environmental Management (EM)

    created thousands of skilled jobs, and helped families to reduce energy waste and save money." On average, the program reduces energy consumption for low-income families by...

  9. Recovery Act: Oxy-Combustion Technology Development for Industrial...

    Office of Scientific and Technical Information (OSTI)

    Report outlines guidelines and key considerations for design and operation of pulverized coal-fired boilers for oxy-combustion. The scope addressed includes only the boiler...

  10. Vice President Biden Announces Recovery Act Funding for 37 Transformat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MIT (Cambridge, MA) - Semi-Solid Rechargeable Flow Battery This concept represents a new type of battery that doesn't exist today: a semi-solid flow battery that combines the best...

  11. Recovery Act: Oxy-Combustion Technology Development for Industrial...

    Office of Scientific and Technical Information (OSTI)

    Date: 2014-04-30 OSTI Identifier: 1159325 DOE Contract Number: NT0005290 Resource Type: Technical Report Research Org: Alstom Power Inc., Windsor, CT (United States)...

  12. Recovery Act: Waste Energy Project at AK Steel Corporation Middletown

    SciTech Connect (OSTI)

    Joyce, Jeffrey

    2012-06-30

    In 2008, Air Products and Chemicals, Inc. (“Air Products”) began development of a project to beneficially utilize waste blast furnace “topgas” generated in the course of the iron-making process at AK Steel Corporation’s Middletown, Ohio works. In early 2010, Air Products was awarded DOE Assistance Agreement DE-EE002736 to further develop and build the combined-cycle power generation facility. In June 2012, Air Products and AK Steel Corporation terminated work when it was determined that the project would not be economically viable at that time nor in the foreseeable future. The project would have achieved the FOA-0000044 Statement of Project Objectives by demonstrating, at a commercial scale, the technology to capture, treat, and convert blast furnace topgas into electric power and thermal energy.

  13. Secretary Chu Announces Nearly $50 Million of Recovery Act Funding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    maintenance costs to users. DOE today is announcing opportunities for geothermal heat pump projects in three areas: Innovative Technology Demonstrations: Cost-shared technology...

  14. Secretary Chu Announces Nearly $800 Million from Recovery Act...

    Energy Savers [EERE]

    ingenuity -- and resources grown right here at home -- we can lead the way toward a new green energy economy." The DOE biomass program will leverage DOE's national laboratories,...

  15. DOE Announces $29 Million in Recovery Act Awards for Weatherization...

    Energy Savers [EERE]

    expand weatherization training centers across the country. These projects will provide green job training for local workers in energy efficiency retrofitting and weatherization...

  16. Subcontractors complete recovery act-funded demolition under budget

    E-Print Network [OSTI]

    Facility was the hub of Project Rover--LANL's research into the use of nuclear reactors to propel rockets and lab space for LANL's research on nuclear fusion. "This is a major milestone for us," said Gordon Dover and contamination from the environment, we've done it with an excellent safety record." More than half of the rubble

  17. DOE Marks Major Milestone with Startup of Recovery Act Demonstration...

    Broader source: Energy.gov (indexed) [DOE]

    been updated as of April 11, 2014. TAMPA, FL. - Today, the Department of Energy joined RTI International and Tampa Electric Company (TECO) to celebrate the successful startup of...

  18. Recovery Act: Oxy-Combustion Techology Development for Industrial...

    Office of Scientific and Technical Information (OSTI)

    tangentially-fired boiler units that minimizes overall capital investment and operating costs. * Evaluate performance of oxyfuel tangentially fired boiler systems in pilot scale...

  19. Recovery Act Funding Helps City Open Energy Efficient Community Center

    Office of Energy Efficiency and Renewable Energy (EERE)

    The City of Largo, Florida is celebrating the opening of its new energy efficient Community Center that will help the city save money by saving energy.

  20. Secretary Chu Announces Nearly $50 Million of Recovery Act Funding...

    Energy Savers [EERE]

    lower maintenance costs to users. DOE today is announcing opportunities for geothermal heat pump projects in three areas: Innovative Technology Demonstrations: Cost-shared...