Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

2

Title  

U.S. Energy Information Administration (EIA) Indexed Site

Name Title Date Cap and Trade: the Lieberman-Warner Climate Security Act of 2007 John Steelman April 2011 The Future of Onshore Oil & Gas Production 1 Largest New Source: Existing...

3

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

4

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

5

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

6

TITLE  

Office of Legacy Management (LM)

Date: 11/21/35 10:12:16 AM Date: 11/21/35 10:12:16 AM 136930 From: HARTMANGSOoro.doe.gov Subject: Re: CX Determination - B&T Metals Removal Action (FUSRAP-036 HOW about this! This is the first CX determination that we have done electronically - - - same-day turnaround!!! Gary Forwarding routing: Les Price, PSRD Bill Seay, FSRD Dave Adler, PSRD Loren Marz, PSRD Gerry Palau. BNI Dave Sexton, BNI Teresa Noe, BNI (PDCC) Forward Header :~Liject: Re: CX Determination - B&T Metals Removal Action (PUSPAP-036 i~thor: PHILLIPSPW at SE31 8 s 1-5 : 11/21/95 12:OO PM Based on the recommendation of Gary Hartman, Environmental Scientist, EW93, I determine that the subject proposed action is categorically excluded from further NEPA review and documentation. Patricia W. Phillips

7

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

James Bennett National Energy Technology Laboratory - USDOE E-Mail: james.bennett@netl.doe.gov Phone: 541-967-5983 Research Efforts at NETL to Improve Gasifier Performance GTC 2013, Colorado Springs, CO - Oct 13-16, 2013 CSC Fouling Refractory/TC Wear RSC Fouling Syngas Cleanup OUTLINE - Research Objectives - Program Overview - Materials Research Focus (Refractories) * Scope of work * Impact to date * Long range goals - Industrial Involvement - Summary/Disclaimer 3 Advanced Gasification Spalling Corrosion Goals: increase gasifier efficiency, reduce capital and operational costs, reduce cost of electricity, develop predictive gasifier models, meet/exceed EPA emission targets, and increase carbon feedstock flexibility (including U.S. low rank coals)

8

TITLE  

Office of Legacy Management (LM)

Peccrdei et .... g:~.g-..o*c *ck .*,- Peccrdei et .... g:~.g-..o*c *ck .*,- &.-. fi+ E C 7 ---.----.- .-.... 3$rS --------- ixx4!30 F A ~ 953 ' 27565' glla 5tcpEe.l. Peeorder Reception N o . - STATE OF COtOPA00 COUFlTY OF GARFIELD MfEREAS, under date of kcember 7 , 1966, an oil and gas l e a s e was entered i n t o between Claude V. Hayward, lessor, snd Rustrat dl1 Ccmpany Incorporated, Lessee, covering, among other l a n d s , t a t 1 1 , being the Northeast Quarter ~b the Southwest Q u a r t e r o f Section 25, f - 7 4 , R-95-W, Garfield County, Calnrnda, sa3d lease being recorded O n 86ak 381, Fag? 418, o f the ~rritdrd$ of B a r f leld County, C s l o r e d ~ ; and @ WWEEA., under date o f l%y 5 , 1967, a U n l t Agrarmnt fas the Dcvelapmnt and Opcratlon o f the Rulison Vn4 t Area I n Gsrfield and He58 Counties Colorado, was entered 1 nto betwen Aus t r

9

TITLE  

Office of Legacy Management (LM)

amv. amv. I.. - - DESlON CRITERIA FOR f ORMERLV UTILIZISU 81TEb REMEDIAL ACTIUN PROORAM [FUmRAP) AND BURPLUS FACILITIES MANAOEMENT D E S I G N C R I T E R I A POR FORMERLY U T I L I Z E D S I T E S REHEDIAL ACTION PROGRAM (?USRAP). AlPD SURPLUS FACILITIES MUINAGEHEIT P R O C R U (SFHP) ( I S S U E D FOR C L I E N T APPROVAL) FEBRUARY 1 9 8 6 ~pproved by: a . CI, Director 2- 24-86 Date T e c h n i c a l Services Division Oak RiPge Operations Office Approved by: 2-24-86 Date Construction and E n g i n e e r i n g Oak Ridge Operations Office 14501-00-DC-01 Rev. 1 PREFACE TO DESIGN CRITERIA T h t s t drsiqn criteria have barn-written i n a generic form that sunmarizes criteria applicable for remedial action and long-term mmagcnent activities associated with the radioactive vaster at the fDSRhP end S?HP sites. Site-specific Information is provided in the

10

TITLE  

Office of Legacy Management (LM)

~overnment ~overnment Department of Energy Oak Ridge Operations Office memorandum DATE: January 19. 1995 SUBIECT: USE OF EXEHPTIOW FROW DEPhRTnEKl OF ENERGY ORDER 5820.2A F O R RADIOhCTIVE WASTE FROn FUSlUl To: James A. Turi , Director, O f f i c e o f Program Support, O f f i c e o f the Deputy Assistant Secretary Waste Clanagelent, M-33, TREY I I This m r a n d u n serves t o n o t i f y 01-33 o f the F o m r l y U t i l i z e d Sites Remedial Action Program's (FUSRAP] i n t e n t t s dispose o f radioactive waste a t a cormercial disposal f a c i l i t y . I n compl iance w i t h the authorization (1. P. G r d l y t o Managers WE Operations Offices dated 10/12/93), the following information i s being provided p r i o r t o comnencement o f the Associate A i r c r a f t , F a i r f i e l d , Ohio, waste stream 2027-01. Waste type: S o i l , vacuum b

11

TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CITY/CO{TRIBAL): CITY/CO{TRIBAL): DATE RECEIVED: BRIEF DESCRIPTION: NEPA REVIEWER NEPA DECISION (CX/ EAtEIS) : NHPA ISSUES NEPA/NHPA CONDITIONS: * ENERGY Oak Ridge Office AK-TRIBE-NATIVE VILLAGE OF NELSON LAGOON CO MP LETE 800145422 STATE : AK Tribe Round Two Review: 0 2/8/2010 Energy effiCiency retrofits on the tribal council office building (insulation, vapor barriers, drywall and supplies, T111 sidmg, hardware, paint and primer, and respirators) S.G. Thornton ex CX APPLIED: CX-EEC8G -004 SUBPART D REF 82.5,85.1 None NEPA Compliance Officer (NCO) Review, including consideration of extraordinary circumstances : ~n may be categorically excluded from further NEPA review. I have determined that the proposed action meets the requirements for categorical exclusion in Subpart D, Appendix A or B.

12

TITLE  

Office of Legacy Management (LM)

, ,-- , ,-- - < , - ' a 7. *: POST OFFICE BOX 2038 1; : . - - , . MANAGED BY M h M l N M A R I E l T A E N E l G Y S I S l E H S . INC. - .-- OAK RIDGE. TENNESSEE 37831 FOR THE U.S. DEPARTMEIIT OF EWEROI April 22, 1994 Dr. W. k Williams EM-421 Trwion n: Building Department of Energy Washington, D. C 20585-0002 Dear Dr. Williams: In a letter to you dated August 18, 1993, a summary of the initial radiological survey was provided with only limited inionnation regarding mncentratiom in soil samples and radiation measurements inside the house. Since then, all of the samples from the initial survey have been analyzed and additional samples have been collected and anal- The reauits have been provided lo y o u ' d D. G. Adler informally as they became available ' I h i r letter contains all the 'as-found"

13

TITLE  

Office of Legacy Management (LM)

Bechtel Bechtel Inferoffice Memorandum TO G. L. Palau Subject Scoping Notice:' Former Associate Aircraft Tool and Manufacturing., Inc . Site, Fairf ield, Ohio copies to T. E. Morris G. R. Gale W & J. S. Allison File No. 7440/124 Date November 1, 1994 Frcm D. D. Sexton MS of ES &H ~t Oak Ridge ~ x t . 4-3643 SCOPING NOTICE INTRODUCTION The purpose of this scoping notice is to formalize the identification and application of federal and state rules and regulations that may apply to the cleanup of the Former Associate Aircraft Tool and Manufacturing Site at 3660 Dixie Highway (hereinafter referred to as the Fairfield Site), in Fairfield, Ohio. This environmental compliance evaluation is based on information contained in the Radiological Survey of the site which provides the nature and extent

14

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

15

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

16

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

17

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial...

18

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render...

19

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background Purpose &...

20

Job Title Organization Name Type End Date Job ID Intern -Industrial Engineer Jabil Circuit, Inc. Intern 8/15/2012 36012  

E-Print Network (OSTI)

Job Title Organization Name Type End Date Job ID Intern - Industrial Engineer Jabil Circuit, Inc HVAC Equipment Technical Support Tom Barrow Co. Full-time 7/31/2012 36332 Internship HQ Inc Intern 9

Meyers, Steven D.

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and...

22

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

award of the (Date) ENERGY STAR: Plant name Plant street address Plant city, state, zip code As documented by the attached Statement of Energy Performance, I affirm that the...

23

Presentation Title Option: Date  

National Nuclear Security Administration (NNSA)

August 31 - September 3, 2009 Prague, Czech Republic 2 We need to assess the impact of aging on metallurgical properties of plutonium * Assessment of aging effects in plutonium is...

24

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

25

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

26

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

27

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

28

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

29

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

30

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

31

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

32

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

33

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

34

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

35

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

36

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

37

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

38

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

39

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

40

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

42

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

43

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

44

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

45

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

46

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

47

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

48

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

49

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

50

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

51

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

52

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

53

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

54

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

55

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

56

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

57

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

58

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

59

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

60

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

62

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

63

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

64

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

65

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

66

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

67

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

68

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

69

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

70

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

71

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

72

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Simulation-Based Engineering David C. Miller, Ph.D. Technical Team Lead, Carbon Capture Simulation Initiative National Energy Technology Laboratory Title, Date Kinetic and...

73

TITLE PAGE  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

74

Date OCE Title Presenter / Sponsoring  

E-Print Network (OSTI)

/20/12 Integrated Design and Operation of Smart Power Plants in the Modern Grid Era Dr. Debangsu Bhattacharyya 10 5:30PM G05 Evansdale Residential Complex 13 2/8/12 Advanced control and monitoring of plant growth

Mohaghegh, Shahab

75

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

76

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

77

Help - Titles  

NLE Websites -- All DOE Office Websites (Extended Search)

data in the bibliographic records for all holdings of the 10 ANL Libraries. A title query will search the fields shown below. Title Alternate Title Publisher's Serial Title...

78

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

79

Title: Sampling Soil and Vegetation at Facility Sites No.: SOP-5139 Page 2 of 9 Revision: 1 Effective Date: June 24, 2011  

E-Print Network (OSTI)

#12;Title: Sampling Soil and Vegetation at Facility Sites No.: SOP-5139 Page 2 of 9 Revision: 1 for collecting soil, sediment, and vegetation samples at facilities such as the Material Disposal Area G (Area G the basic requirements for collecting soil, sediment and vegetation samples at certain facilities. Work

80

Property:Achievement Date | Open Energy Information  

Open Energy Info (EERE)

Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&oldid...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remove and replace the damaged Subsidence Monitor 122 at the Low-Level Radioactive Waste Disposal Facility (LLRWDF) closure cap. Subsidence Monitor Repair Savannah River Site...

82

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drainage channel located to the west side of the T-Area closure cap experiencing heavy erosion. Modification to the channel is required to satisfy flow conditions and...

83

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs Title Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs Publication Type Journal Article Year of Publication 2013 Authors Leibowicz, Benjamin, Maria Roumpani, and Peter H. Larsen Journal International Journal of Energy Economics and Policy Volume 3 Start Page 60 Issue 1 Date Published 2013 Keywords foresight, MARKAL, nuclear electricity, value of information Abstract In this study we analyze the impact of a radical change in nuclear electricity costs on the optimal electricity generation technology mix (EGTM) and constrain the value of information (VOI) on future nuclear costs. We consider three nuclear cost events and four carbon emissions caps. We develop a two-stage framework for energy-economic model MARKAL to eliminate foresight of future nuclear cost movements. We examine how the EGTM responds to these movements under alternative caps and analyze how these movements affect the cost of each cap. We define the expected savings from perfect foresight (ESPF), an upper bound on the VOI. We found that with current technologies, carbon mitigation that does not rely heavily on nuclear electricity is economically insensible. The Strong Cap is extremely costly because it restricts flexibility to respond to cost signals in choosing among technologies. The ESPF is highest under the Medium Cap by a substantial margin.

84

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

This activity is to cut the steam supply header to 261-H (CIF), permanently removing all steam supply to 261-H. The area supply side of the severed header will be capped prior to...

85

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

1 October 2001 November 2001 December 2001 January 2002 February 2002 Cumulative Year To Date 2001 Cumulative Year To Date 2002 Adjusted Year To Date % Change1 United States Motor...

86

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

1 February 2001 March 2001 April 2001 May 2001 June 2001 Cumulative Year To Date 2000 Cumulative Year To Date 2001 Adjusted Year To Date % Change1 United States Motor Gasoline...

87

--No Title--  

Annual Energy Outlook 2012 (EIA)

3 March 2013 April 2013 May 2013 June 2013 July 2013 Cumulative Year To Date 2012 Cumulative Year To Date 2013 Adjusted Year To Date % Change1 United States Motor Gasoline...

88

--No Title--  

Gasoline and Diesel Fuel Update (EIA)

3 May 2013 June 2013 July 2013 August 2013 September 2013 Cumulative Year To Date 2012 Cumulative Year To Date 2013 Adjusted Year To Date % Change1 United States Motor Gasoline...

89

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

3 February 2013 March 2013 April 2013 May 2013 June 2013 Cumulative Year To Date 2012 Cumulative Year To Date 2013 Adjusted Year To Date % Change1 United States Motor Gasoline...

90

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

2 January 2013 February 2013 March 2013 April 2013 May 2013 Cumulative Year To Date 2012 Cumulative Year To Date 2013 Adjusted Year To Date % Change1 United States Motor Gasoline...

91

--No Title--  

Annual Energy Outlook 2012 (EIA)

3 April 2013 May 2013 June 2013 July 2013 August 2013 Cumulative Year To Date 2012 Cumulative Year To Date 2013 Adjusted Year To Date % Change1 United States Motor Gasoline...

92

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

93

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

plastic-like products. A similar material can also be made from lignin produced in biorefineries. The paper, titled "Turning renewable resources into value-added polymer:...

94

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Confinement Ventilation Systems) with the following titles: 1) BC Off-Gas Exhaust Standby Fan Autostart, 2) E-Wing Supply and Exhaust Interlocks, 3) BC Tertiary Exhaust...

95

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ventilation Systems) with the following titles: 1) BC Off-Gas Exhaust Standby Fan Autostart, 2) E-Wing Supply and Exhaust Interlocks, 3) BC Tertiary Exhaust Interlocks...

96

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

research thesis titled "Linking Supercomputing and Systems Biology for Efficient Bioethanol Production." The students -- Scott Horton, Scott Molony and Steven Arcangeli -- were...

97

Report Title: Mapping  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

98

TITLE BLOCK  

Science Conference Proceedings (OSTI)

SAMPLING AND ANALYSIS OF COMMERCIAL FATS AND OILS METHOD NUMBER: Joint AOCS/JOCS Official Method Cd 28-10 APPROVAL: Official Method with full collaborative data TITLE: Glycidyl Fatty Acid Esters in Edible Oils DEFINITION: This meth

99

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Referencing NEWTON About NEWTON About Ask A Scientist Education At Argonne Hailstone Shape Name: Tim Status: educator Grade: 9-12 Country: South Africa Date: Fall 2011 Question:...

100

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL Test Protocol - Testing of Hydrogen Separation Membranes 1 NETL TEST PROTOCOL TESTING OF HYDROGEN SEPARATION MEMBRANES DOENETL-20081335 Date: October, 2008 NETL Test...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Jan-2013 Status Dates: 12072012 to 01182013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN...

102

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

7-Jan-2013 Status Dates: 12072012 to 01182013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN...

103

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

7-Jan-2013 Status Dates: 06302012 to 01182013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN,...

104

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

17-Jan-2013 Status Dates: 12072012 to 01182013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN...

105

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

19-Feb-2013 Status Dates: 01192013 to 06302014 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN...

106

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Papers with 827 Measurements on 17-Jan-2013 Status Dates: 06302012 to 01182013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED,...

107

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

110 Measurements on 19-Feb-2013 Status Dates: 01192013 to 06302014 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents...

108

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Feb-2013 Status Dates: 01192013 to 06302014 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN...

109

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

9-Feb-2013 Status Dates: 01192013 to 06302014 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents Modes are: UNKNOWN...

110

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

84 Measurements on 17-Jan-2013 Status Dates: 12072012 to 01182013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED, PUBLISHED Contents...

111

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

within one year of its date, to obtain any information from educational institution, residential management agents, employers, criminal justice agencies or individual relating...

112

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 DATE: August 26, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

113

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 DATE: August 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

114

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 DATE: August 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

115

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

116

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70 DATE: August 5, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

117

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 DATE: August 28, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

118

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 DATE: August 13, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

119

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 DATE: August 16, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

120

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Protocol - Testing of Hydrogen Separation Membranes 1 NETL TEST PROTOCOL TESTING OF HYDROGEN SEPARATION MEMBRANES DOENETL-20081335 Date: October, 2008 NETL Test Protocol -...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Papers with 491 Measurements on 18-Oct-2013 Status Dates: 08012013 to 10252013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED, VERIFIED,...

122

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Papers with 63 Measurements for physicist MESONTEAM on 18-Oct-2013 Status Dates: 08012013 to 10252013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN,...

123

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Papers with 61 Measurements for physicist LIN on 18-Oct-2013 Status Dates: 08012013 to 10252013 Status Flags are: UNRELEASED, RELEASED, ASSIGNED, ENCODED, OVERSEEN, ACCEPTED,...

124

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Sponsor Information New for 2013: Registered sponsors receive a private "Vendors only" tour of the Molecular Foundry & NCEM (see below for dates) Venue Map Sponsor Links Budget...

125

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

126

Will a Carbon Cap Undermine Standards?  

NLE Websites -- All DOE Office Websites (Extended Search)

Will a Carbon Cap Undermine Standards? Speaker(s): Steven Stoft Date: March 31, 2009 - 12:00pm Location: 90-3122 Germany's Green Party realized over a year ago that "the EEG...

127

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

result of injecting CO2 into the oil reservoirs. To date, over 1 Billion barrels of oil has been produced from field as a result of CO2 flooding. We will be crossing a number...

128

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Bergeron Process Name: Julia Status: student Grade: 6-8 Location: AL Country: USA Date: Winter 2012 Question: What is the Bergeron process? Replies: http:en.wikipedia.orgwiki...

129

--No Title--  

U.S. Energy Information Administration (EIA) Indexed Site

October 03, 2013
Next Release Date: October 17, 2013
PJM West data for 2005-2012Re-released

<...

130

THE TITLE  

E-Print Network (OSTI)

Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. I understand that my thesis will be electronically available to the public. The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing), and that all such use is clearly acknowledged.

Noah Body; D. Odaprof; A. External

2006-01-01T23:59:59.000Z

131

THE TITLE  

E-Print Network (OSTI)

Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. I understand that my thesis will be electronically available to the public. The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing), and that all such use is clearly acknowledged. Signature of Author

Noah Body; D. Odaprof; A. External

2010-01-01T23:59:59.000Z

132

THE TITLE  

E-Print Network (OSTI)

DEGREE: M.C.Sc. CONVOCATION: May YEAR: 2011 Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing) and that all such use is clearly acknowledged.

Noah Body; D. Prof; D. Odaprof; A. External

2010-01-01T23:59:59.000Z

133

unknown title  

E-Print Network (OSTI)

mstockstill on DSKH9S0YB1PROD with NOTICES Act applicable to registered entities. Further, the obligations, requirements and timetables prescribed in Commission rule 36.3(c)(4) governing core principle compliance by the IntercontinentalExchange, Inc., are not applicable to the NGPL TxOk Financial Basis contract with the issuance of this Order. This Order is based on the representations made to the Commission by the IntercontinentalExchange, Inc., dated

Billing Code P

2009-01-01T23:59:59.000Z

134

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

135

THE TITLE  

E-Print Network (OSTI)

DEGREE: M.C.Sc. CONVOCATION: May YEAR: 2007 Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. Signature of Author The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing) and that all such use is clearly acknowledged. iii Table of Contents Abstract......................................

Noah Body; D. Prof; D. Odaprof; A. External

2006-01-01T23:59:59.000Z

136

THE TITLE  

E-Print Network (OSTI)

DEGREE: M.C.Sc. CONVOCATION: May YEAR: 2007 Permission is herewith granted to Dalhousie University to circulate and to have copied for non-commercial purposes, at its discretion, the above title upon the request of individuals or institutions. Signature of Author The author reserves other publication rights, and neither the thesis nor extensive extracts from it may be printed or otherwise reproduced without the authors written permission. The author attests that permission has been obtained for the use of any copyrighted material appearing in the thesis (other than brief excerpts requiring only proper acknowledgement in scholarly writing) and that all such use is clearly acknowledged. iii Table of Contents List of Tables................................... Abstract......................................

Noah Body; D. Prof; D. Odaprof; A. External

2006-01-01T23:59:59.000Z

137

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

138

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

139

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

140

Issue Date: Expiration Date:  

E-Print Network (OSTI)

Discussion: Enclosed for your review and comment are the draft revisions to the FSME Procedure SA-103, Reviewing the Common Indicator, Technical Staffing and Training. SA-103 procedure describes the process and guidelines to be used by IMPEP team members when reviewing the adequacy of an NRC Region or States program for the staffing and training of technical personnel. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Training; Robert J. Lewis; Robert J. Lewis; A. Duncan White

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Help - Title Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Fields - Title (Adavanced Search) The title field contains the words in the publication title. The system will search for the words (either singular or plurals) within the...

142

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

143

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

144

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

145

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

146

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

147

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

148

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

149

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

150

unknown title  

E-Print Network (OSTI)

that Amendment No. 1 does not present a genuine issue as to whether public health and safety will be significantly affected. Therefore, the publication of a notice of proposed action and an opportunity for hearing or a notice of hearing is not warranted. Notice is hereby given of the right of interested persons to request a hearing on whether the action should be rescinded or modified. Further Information For further details with respect to this action, see the application dated March 5, 2008, and Amendment No. 1, which are available electronically, at NRCs

unknown authors

2008-01-01T23:59:59.000Z

151

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

152

Title here  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A National Forum from the FERC National Action Plan on Demand Response Tries to Give an Answer Miriam Goldberg Senior Vice President DNV KEMA Energy and Sustainability National Association of Regulatory Utility Commissioners, ER&E Committee Meeting, July 24, 2012 Portland, OR Measurement and Verification Working Group National Town Meeting on Demand Response, NAPDR M&V WG June 26, 2012 M&V Working Group Mission  Scope - Review work to date to establish DR M&V protocols and baseline calculation methods - Identify - Accepted methods and practices for DR performance measurement - Areas still at issue - Gaps related to protocols and practices for specific types of DR programs, emerging technologies, or markets - Provide a path forward for industry and stakeholders towards analytically valid, widely

153

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

154

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

155

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

156

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

157

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

158

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

159

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

160

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

162

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

163

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

164

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

165

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

166

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

167

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

168

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

169

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

170

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

171

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

172

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

173

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

174

Cap May County Municipal Utilities Authority | Open Energy Information  

Open Energy Info (EERE)

Cap May County Municipal Utilities Authority Cap May County Municipal Utilities Authority Jump to: navigation, search Name Cap May County Municipal Utilities Authority Place Cape May Court House, New Jersey Zip 8210 Product The CMCMUA was created to design, construct and operate efficient wastewater treatment facilities. References Cap May County Municipal Utilities Authority[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Cap May County Municipal Utilities Authority is a company located in Cape May Court House, New Jersey . References ↑ "Cap May County Municipal Utilities Authority" Retrieved from "http://en.openei.org/w/index.php?title=Cap_May_County_Municipal_Utilities_Authority&oldid=343207"

175

unknown title  

E-Print Network (OSTI)

In Nuclear Physics numerous possibilities exist to investigate fundamental symmetries and interactions. In particular, the precise measurements of properties of fundamental fermions, searches for new interactions in ?-decays, and violations of discrete symmeties offer possibilities to search for physics beyond Standard Theory. Precise measurements of fundamental constants can be carried out. Low energy experiments allow to probe New Physics at mass scales far beyond the reach of present accelerators or such planned for the future and at which predicted new particles could be produced directly. 1. Fundamental Forces and Symmetries Symmetries play an important and crucial role in physics. Global symmetries give rise to conservation laws and local symmetries yield forces [ 1]. To date we know four fundamental interactions: (i) Electromagnetism, (ii) Weak Interactions, (iii) Strong Interactions, and (iv) Gravitation. These four forces are fundamental in the sense that all observed dynamical processes in physics can be traced back to one or a combination of them. Together with fundamental symmetries they from a framework on which all physical descriptions ultimately rest.

Klaus P. Jungmann A; Kernfysisch Versneller Instituut

2005-01-01T23:59:59.000Z

176

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

177

Major Design Changes Late in Title II or early in Title III Can Be Costly  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Changes Late in Title II or Design Changes Late in Title II or early in Title III Can Be Costly PMLL Identifier: PMLL-2006-Y12-HEUMF-0001 (Source: User Submitted) Validator: Victoria Pratt Date: 4/24/2010 Contact: 202-586-7358 Statement: Expect increased costs as well as omissions and errors if significant design changes occur late in Title II or early in Title III Discussion: Numerous changes in design requirements late in Title II and early in Title III resulted in significant concurrency in the design-and-build process, making it difficult to avoid major schedule delays and meet commitments. Late in Title II, changes for the foundation and active confinement ventilation system resulted in areas of design immaturity, which led to further design changes and refinements in Title III. This necessitated major structural changes to address

178

G Subject: Implementation of Division B, Title III, Title V and Division C  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B, Title III, Title V and Division C B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No. 112-74 References: Consolidated Appropriations Act, 2012, Title III, Section 301(a), 301(b), 316 Pub. L. No. 112-74 Title V, Sections 501, 504, 505 Title VII, Sections 725 When is this Financial Assistance Letter (FAL) effective? The statutory provisions addressed in this FAL were effective on the enactment date of the Consolidated Appropriations Act, 2012, December 23, 2011. When does this FAL expire? This FAL remains in effect until superseded or canceled. Who is the intended audience? Department of Energy (DOE) and National Nuclear Security Administration (NNSA) Contracting Officers. Who is the point of contact?

179

Title of Presentation Goes Here 32 Point Arial- Initial Caps...  

NLE Websites -- All DOE Office Websites (Extended Search)

-Gas Filter Correlation Radiometers (at 2.3 & 4.6 m) to separate biogenetic fluxes from biomass burning and fossil fuel combustion. Imager - Context 3 ITT's Laser Absorption...

180

TITLE 44 POINT META NORMAL LF ALL CAPS  

Science Conference Proceedings (OSTI)

... MILE: IODEF, RID, and new Extensions ... at the enterprise level increasing, driven by business ... of incidents and outsourcing (Cloud) is driving ...

2012-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Property:Geothermal/AwardDate | Open Energy Information  

Open Energy Info (EERE)

AwardDate Jump to: navigation, search Property Name GeothermalAwardDate Property Type String Description Award Date Retrieved from "http:en.openei.orgwindex.php?titleProperty...

182

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Coordinator Presentation Identifier (Title or Location), Month 00, 2008 Turbine Thermal Management 2 Materials Development NETL, CFI, WPC, UPitt * Low Cost Bond Coat Systems...

183

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chris Guenther, Director, Computational Science Division Presentation Identifier (Title or Location), Month 00, 2008 SBEUC Simulation Based Engineering User Center 2 Agenda * A...

184

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Student Research Assistant - Chemical Splash to Eye - While attempting to lift a wash bottle by the stemcap from within a fume hood, the cap separated from the container...

185

Title Standards 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

186

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

187

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

188

Page 1 of 22 Building Num: Date  

E-Print Network (OSTI)

Check List Page 1 of 22 Building Num: Date: Compressed Gases/WeldingChecklist Title: Action stored away from flammable materials? 1910.252(a)(2)(i) #12;Check List Page 2 of 22 Building Num: Date)(D) Is the insulation material intact on welding machine rod holders? 1910.254(d)(9)(i) #12;Check List Page 3 of 22

Homes, Christopher C.

189

Available Publications - By Title  

Science Conference Proceedings (OSTI)

... Impact of Natural Ventilation Strategies and Design Issues for California Applications, Including Input to ASHRAE Standard 62 and California Title ...

190

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

191

Data Administration Area: Date Issued  

E-Print Network (OSTI)

Policy Data Administration Policy Area: Date Issued: April, 1994 Title: Data Administration Last. INTRODUCTION The President established the Committee on Data Administration (CODA) in May, 1992, to advise him on policies in the area of data administration (attached as references Policy ADC 011 and TOR for CODA

Brownstone, Rob

192

ROTOR END CAP  

DOE Patents (OSTI)

An improved end cap is described for the cylindrical rotor or bowl of a high-speed centrifugal separator adapted to permit free and efficient continuous counter current flow of gas therethrough for isotope separation. The end cap design provides for securely mounting the same to the hollow central shaft and external wall of the centrifuge. Passageways are incorporated and so arranged as to provide for continuous counter current flow of the light and heavy portions of the gas fed to the centrifuge.

Rushing, F.C.

1959-02-01T23:59:59.000Z

193

CENTRIFUGE END CAP  

DOE Patents (OSTI)

An end cap for ultra-gas centrifuges is designed to impart or remove angular momentum to or from the gas and to bring the entering gas to the temperature of the gas inside the centrifuge. The end cap is provided with slots or fins for adjusting the temperature and the angular momentum of the entering gas to the temperature and momentum of the gas in the centrifuge and is constructed to introduce both the inner and the peripheral stream into the centrifuge.

Beams, J.W.; Snoddy, L.B.

1960-08-01T23:59:59.000Z

194

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

195

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

196

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

197

Authors Title Date and Time S. Abdelmoumen, E.  

E-Print Network (OSTI)

The Effect of Placing Season on Strength, Carbonated Thickness and Pore-Size Distribution of Fly Ash Concrete Durability Concrete Using High-Carbon Fly Ash and Pulp Mill Residuals Tuesday June 29 at 9.00 - 10 Pasqualini, Marco Bressan, Agostino Cadorin A measure of fly ash concrete contribution to " Sustainability

Saldin, Dilano

198

EPRI-DOE Newsletter Index Title Issue Date Page  

E-Print Network (OSTI)

-performance stainless steel condenser tubing 147 Aug-00 7 Seven further Vision 21 projects chosen 147 Aug-00 9 IGCC Interest 143 Dec-99 1 AEP Tests a Commercial Microturbine Generator 143 Dec-99 4 Continued Development at the Bare Tube/Refractory Transition of a Commercial CFBC 86 Jun-90 1 Progress Toward Direct Coal

199

Property:GBIG/ObservationEndDate | Open Energy Information  

Open Energy Info (EERE)

ObservationEndDate Jump to: navigation, search This is a property of type String. Retrieved from "http:en.openei.orgwindex.php?titleProperty:GBIGObservationEndDate&oldid5093...

200

Property:ASHRAE 169 End Date | Open Energy Information  

Open Energy Info (EERE)

property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:ASHRAE169EndDate&oldid21585" What links here Related changes Special pages Printable...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

202

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

203

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

204

Investigator Title Technology  

E-Print Network (OSTI)

Principal Investigator Title Technology Sector State Funds Expended Cost Share Expended Jobs,000 1 Schanbacher, Floyd Development and Commercialization of an integrated Biomass to Electricity Funds Expended Cost Share Expended Jobs Created Average Salary Leverage: Federal $ Leverage: State

205

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

206

TITLE48CHAPTER9  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

207

CSU /Agency Totals 85 Task Agreements Agency PI Project Title Start Date End Date Budget  

E-Print Network (OSTI)

, Robert Forest Inventory and Support at Fort Campbell, Kentucky 01-Apr-11 31-Mar-16 $97,876.00 Brozka Area, Island of Hawaii 29-Sep-11 30-Apr-13 $4,988,670.00 Brozka, Robert Sustainable Urban Development,195.00 #12;Cooper, David Long Term Data Collection to Support Restoration Design In the Lulu City Wetland

Crone, Elizabeth

208

CUB /Agency Totals 10 Task Agreements Agency PI Project Title Start Date End Date Budget  

E-Print Network (OSTI)

, Craig Ice Patch Archeology: Orthorectification of Aerial Photography for Glacier National Park, Montana-Mar-14 $17,382.00 RM-CESU: University of Colorado at Boulder/Agency Activity FY12 671,561.00$ #12,573.00 US Geological Survey Goldstein, Phillip OBIS-USA (Ocean Biogeographic Information System US) 01-Aug

Crone, Elizabeth

209

CUB /Agency Totals 14 Task Agreements Agency PI Project Title Start Date End Date Budget  

E-Print Network (OSTI)

National Recreation Area 1970s aerial photograph collection into the Interior Collection Management $19,877.00 RMCESU: University of Colorado at Boulder/Agency Activity FY10 727Scale Analysis and Synthesis 01Sep10 28Feb12 $45,000.00 12 Task Agreements $387,426.00 US Geological Survey

Crone, Elizabeth

210

Title, Location, Document Number Estimated Cost Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Moody to Lev, SUBJECT: NEPA 2012 APS for DOE-SRS, Dated: JAN 25 2012 Title, Location, Document Number Estimated Cost Description EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain EA Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $65,000 Annual NEPA Planning Summary NEPA Reviews of Proposals to Implement Enterprise SRS Initiatives unknown The Savannah River Site Strategic Plan for 2011 - 2015 describes 12 initiatives that Enterprise SRS will pursue by applying SRS's management core competencies in nuclear materials. Implementation of new missions resulting from this effort will likely require NEPA review. However, until firm proposals are developed

211

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas City District US Army Corps of Engineers Importance of Big Eddy Site Importance of Big Eddy Site * Site contains a series of archeological layers, dating from about 500 to...

212

BUDGET KEY DATES  

Science Conference Proceedings (OSTI)

BUDGET KEY DATES. For Immediate Release: December 15, 2009. Contact: Diane Belford 301-975-8400. Budget Key Dates.

2013-06-16T23:59:59.000Z

213

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

214

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

215

Available Publications - By Date  

Science Conference Proceedings (OSTI)

... Impact of Natural Ventilation Strategies and Design Issues for California Applications, Including Input to ASHRAE Standard 62 and California Title ...

216

Main Title 32pt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Peer Peer Review November 2 - 4, 2010 Washington, DC Presented by: Tom Hund, and Wes Baca Sandia National Laboratories Albuquerque, NM (505) 844-8627 tdhund@sandia.gov Sandia is a multiprogram laboratory operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under Contract DE-AC04-94AL85000. Funded by the Energy Storage Systems Program of the U.S. Department Of Energy (DOE/ESS) through Sandia National Laboratories (SNL) Historical Sandia Battery Testing Introduction (2002 - 2010) ESMA Supercapacitors Maxwell Supercaps NessCap Supercaps East Penn lead-acid/carbon (ALABC) Sandia Battery Testing Introduction FY-10 Testing: * The large format (1,000 Ah) Furukawa and East Penn Ultrabattery

217

Presentation title goes here  

NLE Websites -- All DOE Office Websites (Extended Search)

Future of DR Future of DR March 3, 2011 Sila Kiliccote, Mary Ann Piette, Dave Watson, Rish Ghatikar Deputy, DRRC Program Manager, LBNL SKiliccote@lbl.gov 2 Presentation Overview * Trends * Policy * Technology * Implementations * Load As Resource in Ancillary Services Markets * Future directions towards responsive buildings 3 Trends Policy Dynamic Rates - Large C&I, residential, small commercial Codes and Standards -Title 24, US Green Building Council's LEED Credits Smart Grid Standards effort Ancillary Services Technology Integration of Renewables Energy Storage Technologies - Can DR replace storage? PHEVs and EVs Implementation Linking Energy Efficiency and DR Utility Implementations Smart Grid Investment and Demonstration Grants 4 Demand Side Management and Automated DR Future

218

Title 44 Excerpts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Excerpts 4 Excerpts The United States Code - Title 44 PUBLIC PRINTING AND DOCUMENTS And Miscellaneous Statutes Identify the Authority of the Joint Committee on Printing 1997 EDITION CHAPTER 5 - PRODUCTION AND PROCUREMENT OF PRINTING AND BINDING Section 501. Government printing, and blank-book work for Congress, the Executive Office, the Judiciary, other than the Supreme Court of the United States, and every executive department, independent office and establishment of the Government, shall be done at the Government Printing Office, except- (1) classes of work the Joint Committee on Printing considers to be urgent or necessary to have done elsewhere; and (2) printing in field printing plants operated by an executive department, independent office of establishment, and the procurement of printing by an executive department,

219

r-~:m_eport~_94/600_16-_1_...L..--12.G_overnrne_ntAc_ceUion_No._-+--3._"i'ifi,ijf4. Title and Subtitle 5. Report Date A Design Methodology for Bus Transit Networks with Coordinated August 1994  

E-Print Network (OSTI)

r-~:m_eport~_94/600_16-_1_...L..--12.G_overnrne_ntAc_ceUion_No._-+--3._"i'ifi,ijf4. Title Program which is funded 50% in oil overcharge funds from the Stripper Well settlement as provided .......................................................................................151 xii -~--- -- -- ----- --- ---------r-- '"---- --- ------ #12;CHAPTER 1. INTRODUCTION PROBLEM

220

Ex post evaluation of tradable permits : the U.S. SO? cap-and-trade program  

E-Print Network (OSTI)

The U.S. SO2 cap-and-trade program was established as a result of the enactment of the 1990 Clean Air Act Amendments (1990 CAAA) under the authority granted by Title IV, which included several measures to reduce precursor ...

Ellerman, A. Denny

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

the Nation the Nation US Army Corps US Army Corps of Engineers of Engineers Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project Spillway Project Project Scope: Phase 1 provide a new auxiliary spillway with 5 tainter gates, and maint. bridge Phase 2 construct a new highway bridge, remove the plug and re-water. Phase 1 Started: July 1999 Phase 1 Completed: December 2003 Phase 2 Started: March 2004 Scheduled Completion Date: August 2006 One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers Total Project Cost: $39.9M Phase 1 Construction Costs: 22.3M Phase 2 Construction Costs: $6.5M Remaining Activities: Complete permanent electrical connections to the substation. Complete stop logs. Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project

222

Main Title 32pt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electroactive Ionic Liquids: Electroactive Ionic Liquids: A New Approach to Flow Batteries 2. Gallium Nitride Substrates for Power Electronics: Electrochemical Solution Growth Karen Waldrip, PhD Advanced Power Sources R&D Sandia National Labs, Albuquerque, NM knwaldr@sandia.gov Sandia National Laboratories' Programs Electroactive Ionic Liquids: A New Approach To Flow Batteries Date Travis Anderson David Ingersoll Chad Staiger Karen Waldrip Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Flow Batteries *No cross contamination *Flexible layout *High cycle life *Large, tunable capacity *Low maintenance vanadium redox couples are

223

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

From Existing From Existing Coal-Fired Power Plants Jared Ciferno National Energy Technology Laboratory Final Results Revised: December 2007 Original Publication Date: December 2006 2 Disclaimer This presentation was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

224

Main Title 32pt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluation of the Kauai Island Utility Co- Evaluation of the Kauai Island Utility Co- operative System for Energy Storage Potential ESS Program Review Washington, DC November 2, 2006 Abbas Akhil & Aaron Murray Sandia National Laboratories Albuquerque, NM Principal Investigators Mike Yamane Kauai Island Utility Co-op Lihue, HI Slide 2 KAUAI ISLAND UTILITY COOPERATIVE ELECTRIC POWER SYSTEM ISLAND OF KAUAI KAPAA SWITCHYARD LYDGATE SUBSTATION SUBSTATION LIHUE PRINCEVILLE SUBSTATION KOLOA SWITCHYARD WAINIHA HYDRO LAWAI SUBSTATION SWITCHYARD KAUMAKANI SUBSTATION KEKAHA SWITCHYARD MANA SUBSTATION MT. WAIALEALE HANALEI BAY NAWILIWILI HARBOR P a c i f i c O c e a n P a c i f i c O c e a n NORTH KILAUEA ANAHOLA BAY KEALIA WAILUA HANAMAULU BAY POIPU WAIMEA filename : kau_int-0503.dwg date: 4/2/96 WAIAWA HYDRO OLOKELE HYDRO LIHUE LOWER HYDRO LIHUE UPPER HYDRO

225

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

George Beveridge George Beveridge Director, Europe BNFL Environmental Services 27 June 2003 Slide 4 File Ref: WAGR Decommissioning Programme 2000 2001 2002 2003 2004 2005 2006 Operational Waste Hot Box Loop Tubes Neutron Shield Graphite Core Thermal Shield Lower Structures PV&I TC & OVM Campaign Contract End date early 2005 Slide 5 File Ref: Recent Successes  Preliminary Operations completed to programme  Operational Waste completed to programme  Hot Box 5 months late  Loop Tubes completed 20 days early  Neutron Shield completed 2 mths early  Graphite Core completed 8 mths early  Thermal Shield completed 30 days early Slide 6 File Ref:  What's next? Slide 7 File Ref: WAGR Decommissioning Campaign 7a Lower Structures Dismantling Slide 9 File Ref: Lower Structures Layout

226

File:AlaskaTitleVApplicationSubmittalInstructions.pdf | Open Energy  

Open Energy Info (EERE)

AlaskaTitleVApplicationSubmittalInstructions.pdf AlaskaTitleVApplicationSubmittalInstructions.pdf Jump to: navigation, search File File history File usage File:AlaskaTitleVApplicationSubmittalInstructions.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 20 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:34, 1 November 2012 Thumbnail for version as of 11:34, 1 November 2012 1,275 × 1,650 (20 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from

227

Title IX | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IX IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to learn more: 20 U.S.C. § 1681(a) The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title IX, investigating Title IX-related complaints, and providing technical assistance related to Title IX to recipients of Department of Energy financial assistance.

228

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

February 29, 2008 February 29, 2008 These slides are updated on a monthly basis, as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. While every effort is made to present accurate and final data, data may change in subsequent months, as additional information becomes available and as later developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 LBNL Recordable Cases FY08 vs FY06 and FY07 through February 29, 2008 0 1 2 3 4 5 6 7 8 9 O c t o b e r N o v e m b e r D e c e m b e r J a n u a r y F e b r u a r y M a r c h A p r i l M a y J u n e J u l y A u g u s t S e p t e m b e r Num ber of Case s FY '06 Total = 37 Cases FY '07 Total = 47 Cases FY ' 08 Total To Date = 16 Cases 3 LBNL DART Cases FY08 vs FY06 and FY07

229

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 These slides are updated on a monthly basis, as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. While every effort is made to present accurate and final data, data may change in subsequent months, as additional information becomes available and as later developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 LBNL Recordable Cases FY '08 vs FY '06 and FY '07 through October 31, 2007 0 1 2 3 4 5 6 7 8 9 O c t o b e r N o v e m b e r D e c e m b e r J a n u a r y F e b r u a r y M a r c h A p r i l M a y J u n e J u l y A u g u s t S e p t e m b e r Num ber of Case s FY '06 Total = 37 Cases FY '07 Total = 47 Cases FY '08 Total To Date = 8 Cases 3 LBNL Injury Cases By Division for FY'06, FY'07, and FY'O8

230

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 These slides are updated on a monthly basis, as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. While every effort is made to present accurate and final data, data may change in subsequent months, as additional information becomes available and as later developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 LBNL Recordable Cases FY06 through August 31 FY08 0 1 2 3 4 5 6 7 8 9 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Number of Cases FY '06 Total = 37 Cases FY '07 Total = 48 Cases FY '08 Total To Date = 45 Cases 3 LBNL DART Cases FY06 through August 31 FY08 0 1 2 3 4 5 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Number of Cases FY '06 Total = 8 Cases

231

Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300  

Science Conference Proceedings (OSTI)

The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline.

MacDonnell, B.A.; Obenauf, K.S. [Golder Associates, Inc., Alameda, CA (United States)

1996-08-01T23:59:59.000Z

232

Research Associates in Multiscale Physics Project title: Creating macroscale effective interfaces encapsulating microstructural physics  

E-Print Network (OSTI)

website http://www.imperial.ac.uk/employment (please select "Job Search" then enter the job title,300 per annum) Fixed Term for: 36 Months Starting Date: 01 October 2012 Applications are invited for two

Pavliotis, Grigorios

233

Title VI | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

VI VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title VI, investigating Title VI-related complaints, and providing technical assistance to recipients of Department of Energy financial assistance. The Department has promulgated regulations that

234

G Subject: Implementation of Division B, Title III, Title V and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No. 112-74 References: Consolidated Appropriations Act, 2012,...

235

Long-Term Engineered Cap Performance  

Energy.gov (U.S. Department of Energy (DOE))

Summary Notes from 22 July 2008 Generic Technical Issue Discussion on Long-Term Engineered Cap Performance

236

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

237

title Brookhaven National Laboratory Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

item item title CDATA Scientists Discover Hidden Magnetic Waves in High Temperature Superconductors title description CDATA X ray technique reveals surprising quantum...

238

CAP Program Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAP Program Guidance CAP Program Guidance CAP Program Guidance In 2002, the Department of Energy signed an interagency agreement with the Department of Defense's Computer/Electronic Accommodations Program (CAP) program to provide assistive/adaptive technology free of charge to DOE employees with disabilities. The following information regarding CAP is being provided to assist federal employees, managers and on- site disability coordinators with the CAP application process. CAP Program Guidance Responsible Contacts Suzanne Piper LEAD EMPLOYEE WORK LIFE SPECIALIST E-mail suzanne.piper@hq.doe.gov Phone 202-586-8515 More Documents & Publications DOE Reasonable Accommodation Procedures Desk Reference on DOE-Flex Operational Plan and Desktop Reference for the Disability Employment

239

CAP Program Guidance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAP Program Guidance CAP Program Guidance CAP Program Guidance In 2002, the Department of Energy signed an interagency agreement with the Department of Defense's Computer/Electronic Accommodations Program (CAP) program to provide assistive/adaptive technology free of charge to DOE employees with disabilities. The following information regarding CAP is being provided to assist federal employees, managers and on- site disability coordinators with the CAP application process. CAP Program Guidance Responsible Contacts Suzanne Piper LEAD EMPLOYEE WORK LIFE SPECIALIST E-mail suzanne.piper@hq.doe.gov Phone 202-586-8515 More Documents & Publications DOE Reasonable Accommodation Procedures Rehabilitation Act of 1973 Operational Plan and Desktop Reference for the Disability Employment

240

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Last Name First Name Job Title Supervisor CourseTitle CourseDate RenewDate 2010 Health, Safety, and Radiation Training Report for Departments  

E-Print Network (OSTI)

Hager, Postdoctoral Research Associate (Gibson) 7. Dr. Robert Handler, Postdoctoral Scientist (Shonnard (Goldman) 45. Alex Munguia, Chemical Engineering (Shonnard) 46. Chelsea Nikula, Chemistry (Thompson) 47

Wilcock, William

242

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Value Propositions for Four Value Propositions for Four Modular Electricity Storage Demonstrations in California EESAT 2007 San Francisco by Distributed Utility Associates, Inc. Jim Eyer, Senior Analyst jim@dua1.com Susan Horgan, President susan@dua1.com Funded by the Energy Storage Systems Program of the U.S. Department Of Energy (DOE/ESS) through Sandia National Laboratories (SNL). EESAT 2007 - Eyer - DUA 2 Agenda * Scope * Background * Assessing Value Propositions * Supercapacitor for Sacramento Light Rail * Supercapacitor for Load & DG Integration * Flow Battery for T&D Deferral * Flywheel for Area Regulation * Outlook EESAT 2007 - Eyer - DUA 3 Scope * DOE ESS partnership with CEC/PIER - innovative electricity storage demonstrations in California that are sponsored by CEC/PIER * DUA: Evaluation and Report

243

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brad Tomer Brad Tomer Director, Strategic Center for Natural Gas & Oil EPACT Section 999 Federal Advisory Committee Meetings January 28-29, 2008 Strategic Center for Natural Gas and Oil Strategic Center for Natural Gas & Oil * Create public benefits by investing in research that industry would not take on itself * Deliver a balanced portfolio of technology to: - Enable Independents to efficiently produce discovered resources - Conduct long-term/high risk R&D - develop entirely new sources of supply - Minimize environmental impact Implement science and technology programs that resolve the environmental, supply and reliability constraints of oil and natural gas resources and enhance our energy security A multi-discipline, long-term, high-risk, and high-reward endeavor that

244

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ultra-Deepwater Advisory Ultra-Deepwater Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Ultra-Deepwater Advisory Committee Sub-Groups * R&D Theme Content * Solicitation Process * Environmental * Access Strategic Center for Natural Gas and Oil UDAC Recommendations for 2007 Plan

245

TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ClTY/CO{TRIBAL): ClTY/CO{TRIBAL): DAT E RE CEIVED: CA-TR iBE-TABLE MOUNTAIN RANCHERIA OF CALIFORN IA 61 735 1 937 Tribe Oak Ridge Office COMPLETE STATE: CA Round Two Review: t I BRIEF DESCRIPTION: Develop energy efficiency and con servation strategy and fea si bility study ofthe Rancheria energy usage NEPA REVI EW ER NEPA DECISION (CX/EA/EIS): NHPA ISSU ES NEPAjNHPA CONDITIONS: S.G. Thornton ex CX APPLIED: CX-EECBG -001 LI SUBPART D REF Approval for strategy/feasibility st udy only Ny( Compliance Officer (NCO) Review, including consideration of extraordiOilfy circumstiinceS: ~ction may be categorically ucluded from further NEPA review. I hilve dete rmined that the proposed action meets the requirements for Cltegorical exclusion in Subpart D, Appendix A or B. C Action requires approvill by Head oft

246

TITLE  

Office of Legacy Management (LM)

CHAPTER lV CHAPTER lV 1. PURPOSE. This chapter presents radiological protection requirements and guidelines for cleanup of residual radioactive material and management of the resulting wastes and residues and release of property. These requirements and guidelines are applicable at the time the property is released. Property subject to these criteria indudes, but is not limited to sacs identied by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). The topics covered are basic dose limits, guidelines and authorized limits for allowable levels of residual radioadive material, and control of the radioactive wastes and residues. This chapter does not apply to uranium mill tailings or to properties covered by mandatory legal requirements.

247

TITLE  

Office of Legacy Management (LM)

e ~ a r t m e n t of Energy Oak Ridge Operations P.O. Box 2001 Oak Ridge. Tennessee 37831- November 7, 1995 Dave To1 b e r t B&T Metals Company & B&T F l o o r Company P. 0 . Box 163520 Columbus, Ohio 43216-3520 Dear M r . To1 b e r t : REAL ESTATE LICENSE REORDOER-7-96-0103, B&T METALS COHPANY, COLUMBUS, OH Enclosed f o r your records i s a copy o f the f u l l y executed 1 icense between B&T Metals Company and the Department o f Energy. Is t h e separate l i c e n s e f o r B&T F l o o r Company a l s o being transmitted t o t h i s o f f i c e ? Thank you f o r your cooperation and assistance i n t h i s action. I f you have any questions concerning t h e r e a l e s t a t e instrument, please f e e l f r e e t o contact m e a t 423- 576-0977. Sincerely, Katy Kates Realty O f f i c e r Enclosure As stated

248

TITLE  

Office of Legacy Management (LM)

. . · MONTICELLO NPL SITES FFA QUARTERLY REPORT: January 1- March 31, 2007 DOE Site Manager: Jalena Maestas 1.0 MMTS Activities/Status Repository and Pond 4 * Monthly and quarterly inspection of the repository identified no problems other than shrub damage by voles (inspection checklists attached). * Monthly inspection of Pond 4 identified no unacceptable conditions. * Pond 4 leachate detection and removal systems operated at normal levels (leachate pumping summary attached). * Repository leachate collection and removal system (LCRS) and leachate collection system (LDS) operated at normal levels (leachate pumping summary attached). * Equipment purchased to upgrade repository LCRS and LDS remote sensing and telemetry system. * Portions of repository cover were manually re-seeded with desirable shrubs to repair areas

249

TITLE  

Office of Legacy Management (LM)

M M A U h G E D 0 1 M M l N Y A R I E I ENERGY SYSTEMS. IYC. FOR THE U.S. O E P A R I M E I I T OF ENEnOY June 14, 1994 POST OFFICE BOX 2006 OAK RIDGE. TENNESSEE 37831 Dr. W. A. Williams EM-421 Trevion II Building Department of Energy Washington, D. C. 20585 Dear Dr. Williams: T r i p Report: Radiological Survey of Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio (FOHOOl), M a y 31 and June 1,1994 On May 31 and June I, a radiological survey was conducted in the area surveyed during the March 7, 1994 survey in the referenced facility. This letter provides the results of that survey. Survey methods consisted of a beta-gamma survey of the surface of the concrete as the floor covering material was being removed by a construction contractor to begin renovation of the former

250

TITLE  

Office of Legacy Management (LM)

RIDOH RIDOH NArnONAL LABORATORY c- Results of the Independent Radiological Verification Survey I.* K . . . . 1 A . T I r n * at the Former Associate Aircraft Tool and Manufacturing Company Site, Fairfield, Ohio - (FOH001) D . E . Rice M . E . Murray K. S . Brown EEALTH SCIENCES RESEARCH DMSION E ' * I ~ m d w a s k M ~ t ~ ~ ~ ( ~ N o . E X Z D 2 0 0 1 O; AB131DM) Aircraft ~ o o l and Manrlaet~ring Company Site, Fiirfleld, Oh10 (FOH001) D. E. Rice, M. E. Mumy, K:S. Brown . . . . lmza@am Tam R D. FdeJr-E-tAppholboPl4DCrdDPllLlltW D. E . Rice - Suvsy Tam iada 1 3 9 3 1 9 CONTENTS .................................................. LISTOFFI- v .................................................. LISTOFTABLES 6 A C K N O - S ............................................. u ABSTRACT ....................................................... xi

251

TITLE  

Office of Legacy Management (LM)

Formerly Utilized Sites Remedial Action Program (FUSRAP) Formerly Utilized Sites Remedial Action Program (FUSRAP) - Contract No. DE-ACOS-9 1 OR21 949 Post-Remedial Action Report for the 8. & T Metals Site Columbus, Ohio October 1996 POST-REMEDIAL ACTION REPORT f OR THE . . B&T METALS SITE COLUMBUS. OHIO OCTOBER 1 W6 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACOS-91 OR2 1949 I Bechtel National, Inc. Oak Ridge, Tcnncssoe I Bcchtel lob No. 14501 CONTENTS Page FIGURES ............................................................................................................................................... iv TABLES ................................................................................................................................................ iv

252

TITLE  

Office of Legacy Management (LM)

Verification Verification Survey at B&T Metals, 425 West Town Street, Columbus, Ohio M. E. Murray V. P. Patania C. A. Johnson This report h s ken rcpmduccd directly from the t f s i avail3ble copy. Avaihble to DOE and DOE c o n m u x s from the Olficc of Scienlific and Technical inlormaliar. P.O. Boa 6 1 . W Ridsee. l X 378331: priccsav&lable from (6t5) 576-8101, TTS 6268401. A v ~ i t b I e t o h e public lmm the Naliorul Technical Inlormalion Service. U.S. Dcpvtmenl 01 Commcrcc. 5285 Pon Royal Rd.. Springlield. VA 22161. This rcpon was prep& as an account o f work sponsored by an agency o f thc Unircd Sutcs Govcmmcnr. X c i h c ~ thc Uniicd Sulcs Govcrnmcn~ nor any ;Igcncy, Lhcrcol. nor any of theu crnployccs, mikes my warmly. cxprcss, or implicd.or assumcs my legal l i i i l

253

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

254

Title  

U.S. Energy Information Administration (EIA)

Important Aside--Percentage of Ethanol (Alcohol) ... Perform annual comparisons of fuel ethanol plant capacity data from both EIA and non-EIA sources with EIA fuel ...

255

TITLE  

Office of Legacy Management (LM)

and those taken before remedial action) and removal-type actions similar in scope under RCRA and other authorities (induding those taken as partiat closure actions and those...

256

TITLE  

Office of Legacy Management (LM)

Schedule based on a 9-mo.year construct ion period, Not total cost for cleanup. Pair market price could be 168,000. VOLUME (1000 CUBIC METERS) NOTE: To convert to cubic...

257

TITLE  

Office of Legacy Management (LM)

Description of the Formerly Utilized Description of the Formerly Utilized Sites Remedial Action Program United States Department o f Energy "This book w l r prepartd u a n account 01 wo* lporuond by m uency o f the Unhd Sutes Govrrnmrnt. N a l h r t the United StalrsGovrrnment nos i n y m y lhumf, rm any 01 lheh employees, makes any .nrrmly, u p m r or impkd, or arrunrr my I@ LirbHty or rcsponiibiiily for ihe rccutrcy. wmplaenm. 01 u ~ l u l n e ~ i of any intotnulion, mppmtur, p f d u c t , 01 p r o m s d i ~ l o w d , or rtprrlrntr that i s we MUM mi initlnp plivmdy omd rightr Refnrnce herein L o m y rpedfw wmmrcial produel, pmarr, o r s e n h by b a d e name, tr.demaR, mmufrctunr, or othcrurtrr, doer not mcnrrlly m n n h u u m its endoncmmt, rccommmdalion, or favorin# b y the United Stater Govmment or my y m ~ y thacol. The vi+ur and opiljOna o

258

TITLE  

Office of Legacy Management (LM)

J J a s 1. Besl President Force Control Industries 3664 Dixla H i 9 h p ~ Falrfleld, Ohio 45014 Dear Hr. Besl: With your consent,. the U.S. Dcpartwnt o f Energy (WE) conducted a r a d i o l q l l c a l survey a t the Former Associate A i r c r a f t Tool and Manufrcturlng Conpany s l t e i n Fairfield, Ohio. OOE has received the-auwey report frm i t s survey. contractor, Oak Rldge national Laboratory (OWL). Two copies o f the report are enclosed f o r your information and use. 71.5 report C 0 n ~ l ~ d e S that uranium i s present I n the f a c i l l t y I n excess of the ME guidelines f ~ r restdual r a d l o i c t i v e matertal. This conclusion i s based on d i r e c t radiation r a s u r a r n t s (shorn graphically on Flgures 8 , 9, 14, and Table 5 on pages 8, 9, 22, and 29, respectively) and om analysls o f s o i l samples, dust sllples, m

259

TITLE  

Office of Legacy Management (LM)

SHOAL AREA SHOAL AREA TRACER TEST EXPERlIMENT prepared by Rosemary Carrolt, Todd Mihevc, Greg Pohll, Brad Lyles, Sean Kosinski and Rich Niswonger submitted to Nevada Operations Office U.S. Department of Energy Las Vegas, Nevada NOVEMBER 2000 Publication No. 45177 Reference herein to any specific commercial pmduct, process, or service by trade name, trademark, mufacturer, or otherw~se, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors. The views a d opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. This report has been reproduced directly from the best available copy.

260

TITLE  

Office of Legacy Management (LM)

- . ' R U L 000003 United States Office of Radiation and ~ ~ ~ - 4 0 2 7 ~ - 0 2 - 0 0 7 Environmental Protection 1ndoor Air November 2002 Agency Washington, DC 20460 &EPA Annual Water Sampling and Analysis, Calendar Year 2002: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2002 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Max G. Davis Terry L. Mouck Prepared for the U.S. Department of Energy under Interagency Agreement DE-AI08-96NV11969 RADIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

TITLE  

Office of Legacy Management (LM)

-. -. i . , . United States Government L-u+-tw / S / V ~ f Department of nersy memorandum D i T E June 0 5 , 1995 FEP-Y ATTK OF: EM-421 (U. A. Williams, 301-903-8149) SUGJECT Hazard Assessmnt f o r Radioactive Contamination a t the Associate. A i r c r a f t Site, F a i r f i e l d , Ohio To L. Price, OR This memorandum i s t o ' provide comments and approval o f the Associate i r ft i t n f o r e n ' i A r c a S eHazardAssessmet I d t i f e d S o i l C ~ m i n a t i o n . The hazard assessment was prepared and supplemental 1 i m i t s were requested, based on a single s o i l sample w i t h 134 picocuries per gran o f uranium. This sample was obtained from underneath the b u i l d i n g slab i n an area t h a t was a loading dock f o r the f a c i l i t y during Atomic Energy Comnission operations during the 1950s. The area i s n o t r e

262

TITLE  

Office of Legacy Management (LM)

Mi Mi w u United S taies Office of Radiation a ~ d EPA 8 Environmental Protection Indoor Air Dcccmbcr 1999 Q Agency Washington, DC 304hC) EPA-402-R-93-0 12 Q w 0 4 : 0 0 0 4 &€PA Annual Water Samp and Analysis Ca endar Year 1999: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 1999 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AIO8-96NVl1969 FL4DIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

263

TITLE  

Office of Legacy Management (LM)

Post-Remedial Action Report Post-Remedial Action Report for the Alba Craft Site and Vicinity Properties Oxford , Ohio August 1995 POST-REMEDIAL ACTION REPORT FOR THE A D A CRAFT SITE AND VICINITY PROPERTIES OXFORD, OHIO AUGUST 1995 Prepared f o ~ United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACO5-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

264

TITLE  

Office of Legacy Management (LM)

, , - :. , L L b ' pi1 2 25. STATE OF MISSISSIPPI a . a . , i l l ; .. - . a ,-. , I , SALMON SITE , , , . . . C I A . - - 1 COUNTY OF LAMAR - T - TRACT NO. 101-E KNOW ALL MEN BY THESE PRESENTS, that, we, MARTHA T. BRIDGES alkla MARTHA TATUM BRIDGES LOPEZ, ROBERT TODD BRIDGES, MARTHA TATUM BRIDGES LOPEZ as Guardian of Nlchoias Carl Bridges, a minor, DIANA W. TATUM, NANCY 0. TATUM, and ADDISON T. TATUM, JR., alkla A. T. Tatum, Jr., whose addreas I s clo Mr. John Burnam, Post Office Box 1828, Hattiesburg, Mlssisslppi 39403, hereinafter referred to as the GRANTORS, for and in consideration of the sum of THREE HUNDRED DOLLARS AND NO1100 ($300.09). the receipt and sufficiency of which are hereby acknowledged, do hereby GRANT. BARGAIN, SELL and CONVEY unto the UNITED STATES OF AMERICA

265

TITLE  

Office of Legacy Management (LM)

Hydrologic Processes and Hydrologic Processes and Radionuclide Distribution in a Cavity and Chimney Produced by the Cannikin Nuclear Explosion I Amchitka Island, Alaska By HANS C. C M S S E N H Y D R O L O G Y O F N U C L E A R T E S T S I T E S G E O L O G I C A L S U R V E Y P R O F E S S I O N A L P A P E R 7 1 2 - D Prepared on behay o J the US. Energy Research and Deuclopment Administration U N I T E D S T A T E S G O V E R N M E N T P R I N T I N G O F F I C E . W A S H I N G T O N : 1978 UNITED STATES DEPARTMENT OF THE INTERIOR CECIL D. ANDRUS. sectwary GEOLOGICAL SURVEY V. E. McKelvey. Direcror Library of Conlresr Cnrriolrtn# tn Puhltcrtban Udtr Ct*aaasn. Wnnr C. WydrOlo~nC procesbes and radionucl~dc distributnon in a cavity and chnmncv praduccd by rna Cannukin nuslssr ~ n n l u r r u n . h m c n n u r islrnd. AI;n*U*. (Hydrolory o f nuclssr tcat ritsal (Caoloyicsl Survey Profeuionai P

266

TITLE  

Office of Legacy Management (LM)

1 ~ 1 ~ ~ l l R R l l l l l l l i l ~ l ~ I R u 0 0 0 0 ~ f A Class 111 Cultural Resources Survey of the U. S. Department of Energy Rullson Gas Stimulation Test S f e Garfield County, Colorado December 1993 IT be?: tlX'i;j PBBRARII Environmental Restoration 1 A Class Ill Cultural Resources Survey of the U. S. Department of Energy Rulison Gas Stimulation Test Site Garfield County, Co torado December 1 993 Environmental Restoration A Class Ill Cultural Resources Survey of the U . S . Department of Energy Rulison Gas Stimulation Test Site Garfield County, Colorado Prepared for: W E Nevada Operations Office Las Vegas, Nevada 89193-8518 Prepared by: I T Corporation 4330 S. Valley View Blvd. Las Vegas, Nevada 89103 Work Performed under Contract No.: DE-AC08-92NV 10972 December 1993

267

Title  

U.S. Energy Information Administration (EIA) Indexed Site

Unlocking Energy Efficiency Unlocking Energy Efficiency in the U.S. Economy 2010 Energy Conference EIA, SAIS April 7, 2010 McKinsey & Company | 1 Carbon emissions Gigatons CO 2 e * End-use consumption Quadrillion BTUs * Includes carbon emission abatement potential from CHP Source: EIA AEO 2008, McKinsey analysis Significant energy efficiency potential exists in the U.S. economy Industrial Residential Commercial -9.1 Baseline 2020 Baseline case, 2008 30.8 36.9 39.9 NPV- positive case, 2020 3.2 NPV- positive case, 2020 Baseline 2020 4.3 Baseline case, 2008 3.9 -26% Savings -23% -18% -29% -28% McKinsey & Company | 2 Source: EIA AEO 2008, McKinsey analysis Primary energy End-use energy Electricity CHP Gas Oil Other Carbon emissions 100%= 9.1 quadrillion BTUs 1,080 TWh 2.9 TCF 250 MBOE Significant efficiency potential across fuel types Contribution by energy source to 2020 efficiency potential

268

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jamie Brown Jamie Brown Director, Earth & Mineral Sciences Division EPAct Complementary Program Update January 25, 2008 Office of Research and Development Introduction NETL's EPAct 999 Complementary R&D Program * Overview of the 4 research areas: - Drilling Under Extreme Conditions (DUEC) - improve the economic viability of drilling for and producing from domestic deep (>15, 000ft) and ultra-deep (>25,000ft)O&G resources. - Environmental Impacts of O&G (EI) - provide unbiased scientific information and analysis of the environmental impacts of O&G, and develop new technology to effectively deal with any negative environmental impacts - Enhanced and Unconventional Oil Recovery (EUOR) - develop advanced technologies that will move the status of known but recoverable oil resources to

269

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oil & Natural Gas R&D Oil & Natural Gas R&D National Energy Technology Laboratory Office of Fossil Energy 2008 Annual Plan (Draft) EPACT 2005, Subtitle J, Section999 John R. Duda, Deputy Director Strategic Center for Natural Gas & Oil January 30, 2008 Strategic Center for Natural Gas and Oil 2008 Annual Plan (Draft) Development * RPSEA submitted Draft Annual Plan - November 14, 2007 - Modifications to 2007 plan * NETL developed the 2008 Annual Plan (Draft) - Federal Advisory Committees' recommendations - Program status and requirements - Complementary research plan * Submitted to HQ - December 11, 2007 - Incorporated comments from FE, et al * Sent to Federal Advisory Committees - January 9, 2008 Strategic Center for Natural Gas and Oil 2008 Annual Plan (Draft) General * "Ongoing activities"

270

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Upcoming DOE's Upcoming 2012 Congestion Study Keith White California Public Utilities Commission December 15, 2011 2 General Comments ◊ California has been fully participating in west-wide "economic" transmission studies (TEPPC since 2006, recently with much-appreciated ARRA funding) ◊ The 2005 Energy Policy Act gives DOE unclear scope regarding "congestion," and a requirement to consult with states. The following are essential: * Clearly address the specific rationale for transmission: reliability, economic efficiency, resource priorities; * If considering potential future congestion* contingent on certain conditions, fully consider the likelihood of those conditions and the consistency with state energy policies and actual market developments.

271

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

CNT OW048 CNT OW048 Review of Environmentally Sensitive Resources at Off-Site Locations Nevada Test Site Nevada ~nvironmental Restoration Review of Environmentally Sensitive Resources at Off-Site Locations Prepared for: U.S. Deparuncnt of Energy Nevada Field Office Las Vcgas, Nevada R e p d by: l T Corporation Las Vcgas, Nevada Work Pcrformcd Under Conmct DE-AC08-92NV10972 March, 1993 Table of Contents 1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1.1 Hazardous. Contaminated. or Polluted Sites . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2 Environmentally Sensitive Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 1.2.1 Property of Historic. Archaeological. or Archirectural Significance . . . . . . 1-3 1 2 . 2 Threatened. Endangered. or Candidate Species .

272

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractors Contractors July 2010 Reporting Period 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

273

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unconventional Resources Unconventional Resources Technology Advisory Committee Recommendations - 2007 Annual Plan Brad Tomer, Director Strategic Center for Natural Gas & Oil January 29, 2008 Strategic Center for Natural Gas and Oil Federal Advisory Committee Recommendations for 2007 Draft Plan * All recommendations were accepted - Incorporated into the final 2007 Annual Plan - Addressed in an otherwise appropriate manner * This review is designed to briefly re-state summarized recommendations and DOE's response. Detailed discussions should be deferred until later in the day. Strategic Center for Natural Gas and Oil Unconventional Resources Technology Advisory Committee Sub-Groups * Technology Transfer * Regulations * Water and Environmental Management * Production Research Themes

274

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

275

TITLE  

Office of Legacy Management (LM)

Nationd Laboratory Nationd Laboratory 9700 South Cass Avenue, Argonne, IUinois 60439 DERIVATION OF GUIDELINES FOR UaANIUbi RESIDUAL &ADIOACTIVE MATERIAL M 801L AT THE FORMER - U T E AIRCRAFT TOOL AND m A C l ' U I U N C COMPANY SlTE, FAIRFIELD, OHIO E.R. Faillace, M . Nimmagadda, and C . Yu Environmental Assessment Division January 1995 work sponsonxl by U.S. Department of Energy OMice of Environmental Restoration Washington, D.C. CONTENTS NOTATION ......................................................... v ............................... 1 1NTRODU.CTION AND BRIEF HISTORY 3 ...................................... 1.1 Site Description and Setting 3 .................................................. 1.2 SiteHistory 4 1.3 Derivation of Cleanup Guidelines .................................. 6

276

TITLE  

Office of Legacy Management (LM)

FORCE CONTROL INDUSTRIES,'INC. 1 FORCE CONTROL INDUSTRIES,'INC. 1 2 3 0 7 2 CONTROL %60 Dixie Hwy.. Zip 45014 P.O. Box l a . Z p 45018 11W b l e . Sule F Failfield. Ohio T w M i g a n a8083 Phone: (513) 868-0900 Phone: !B10) 52441= FAX. (513) 868-2105 F . U i81C.l 52d-1208 C,ir Shear Clutch & Brake Systems November 10.1994 U. S. Deparbnent of Energy Oak Ridge Operations office Ann: AD-424, Katy Kates P.O. Box 2001 Oak Ridge, TN 37831 Dear Ms. Kates, In furtherance of the August 24,1994 letter from Doug Shook, his subsequent conversation with our legal counsel, Timothy A. Gamy, follow-up with Steve Priest, and your letter of November 4,1994, the modifications you have proposed to the real estate license are acceptabte to us. As you suggested, we have made the changes to the real estate license heretofore submitted to us, and we have enclosed three copies of

277

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

Individuals Individuals Step by Step Instructions - Page 1 of 4 Helpful Information STEP 1. Log in to the EH&S Job Hazards Analysis (JHA) system at https://ehswprod.lbl.gov/ehstraining/jha/login.aspx Use your LDAP username and Password to log in to the system. You may log in without an LDAP if you know that you have not been given one yet. Contact the Help Desk (486-4357) for assistance. Note: You will not be able to complete the process until you have a valid LDAP username and password STEP 2. To begin, select JHA New JHA from the Main Menu If you have already begun your JHA process, you can select to Modify or View from the JHA Main Menu item as well. Step by Step Instructions - Page 2 of 4 Helpful Information STEP 3. Begin the Questionnaire by selecting your work location

278

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients July 2010 Reporting Period 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

279

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractors Contractors 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

280

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Renewable Energy eere.energy.gov 1 Clean Energy Developments in the U.S. China-U.S. Renewable Energy Forum Bobi Garrett National Renewable Energy Laboratory May 26, 2010 Office of Energy Efficiency and Renewable Energy eere.energy.gov 2 Today's Talk * U.S. Clean Energy in Context * The U.S. Recovery Act: Opportunity from Crisis * The U.S. Congress and Clean Energy: Getting to 60 * China-U.S. Collaboration on Clean Energy 2 Office of Energy Efficiency and Renewable Energy eere.energy.gov 3 Today's Talk 3 * U.S. Clean Energy in Context * The U.S. Recovery Act: Opportunity from Crisis * The U.S. Congress and Clean Energy: Getting to 60 * China-U.S. Collaboration on Clean Energy Office of Energy Efficiency and Renewable Energy eere.energy.gov 4 U.S. Energy Production and

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

282

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients July, 2010 For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or go to: http://www.FederalReporting.gov 1 Outline of Presentation * Timeline * Helpful Hints for Repeat Reporters * When is FederalReporting.gov Reporting Complete? * FederalReporting.gov Features For more information, contact DOE at: https://recoveryclearinghouse.energy.gov or 1-888-363-7289 or

283

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Finance Benchmark Results Executive Briefing Pantex Finance Benchmark Results Executive Briefing © 2009 The Hackett Group, Inc. All rights reserved. Reproduction of this document or any portion thereof without prior written consent is prohibited. Table of Contents  Benchmark Background  Company Baseline  Executive Summary  Performance Driver Analysis  Recommendations & Next Steps  Appendix Page 3 NNSA - Pantex Finance Benchmark Results Executive Briefing © 2009 The Hackett Group, Inc. All rights reserved. Reproduction of this document or any portion thereof without prior written consent is prohibited. Benchmark Results Should be Evaluated in Conjunction With the Specific Requirements of Pantex's Industry What this benchmark is . . . What this benchmark is not . . .

284

TITLE  

Office of Legacy Management (LM)

p p a * T A olistii. ..ow ... Unlted States awernment 00))#~Tmsnt of Energy - - memorandum D*=APR 0 2 1987 muym NE-23 A m OR W C I : Revised Guidelines f o r Resldual R a d ~ o a c t i v e M a t e r i a l a t N S R A P and R e m t e SRIP S l t e s Ahrends, OR Kluk, OP-124 Nelson, WSSPd Schrelber , SSDPD Welty, EH-23 G I l b e r t , MIL Berven, ORHL Berger, ORAL! Young, Aerospace Attached I s a revjsed copy o f thc Department's Guidelines f o r n s l d u a l r a d l o a c t f v e material. This versfon o f the doculnent has been revised t o i n c l u d e comnents from EH and t o address the h o t spot and s u p p l m n t a l . I i m l t/except{ons procedures out1 i n e d during t h e July 1906 workshop and subsequent working group meetings. EH intends t o include these guidelines i n d r a f t DOE Order 5480.x~. R a d i a t i o n P r o t e c t i o n o f t h e Publlc and

285

TITLE  

Office of Legacy Management (LM)

Survey Results Survey Results for Neigh boring Properties of the Alba Craft Site Oxford, Ohio U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Index / / { i s / . . ....................................................... s. Main s t r a e t f i o w e s 3 . . (~1-008,012-014,016) : : , . W . Rose Avenue Properties ............................... .:. ........... I . . .97 (017) Linden Street Properties .................................................... 103 (010-011) Municipd Landfill h d parts of .......................................... 123 Tllpmnd. High School m p t s (018) Hr. J e f f Schroer Department of Energy Washmgton, DC 20585 S t ? i is93 Oxford Real Estate, Inc. 33 Yest Walnut S t m t Oxford, Ohto 4 5 M 6 Dear k. Schorr: W i t h theconsent of the m a r s , the U.S. Dapartrnt o

286

TITLE  

Office of Legacy Management (LM)

TO File rn w. 1 1311 300 TO File rn w. 1 1311 300 s ~ b p ~ t B&T Metals Site Scoping Trip Report mh November 22, 1995 hwr J.G. Braun 01 FUSRAP - Geotech ~ l t 4D12 f i t 241-5296 C ~ M S T O Distribution This trip report summarizes the information obtained by b t h the New York and MissourifOhio Teams during visits to the B&T Metals site. The scoping trips were - . - . performed to provide information to aid in the detailed ptanning, design, and preparation for site characterization and remedial action. The scoping trips included a site walkover, library - - - research to investigate historic Sanborn maps and newspaper articles, an interview with a retired 3&T Metals employee who was involved with the former MEDlAEC activities, coordinating with the property owner in preparation for characterization and remedial action,

287

TITLE  

Office of Legacy Management (LM)

Sensitive Species Survey Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 & \ Environmental Restoration Sensitive Species Survey Results for the Rulison and Rio Blanco Sites, Colorado Prepared for: U.S. Department of Energy Environmentaf Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared by: IT CORPORATION 4330 S. Valley View BIvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No. DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n ... List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111 List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv 1.0 Introduction .

288

TITLE  

Office of Legacy Management (LM)

OFF C OFF C . 1 Ili II11IlIIllllllllllllllI1111I~I B M - 171- 147 ~ ~ ~ 0 3 3 1 0 8 Biology and M e d i c i n e AMCHITKA BIOENVIRONMENTAL PROGRAM BIOENVIRONMENTAL S A F E T Y STUDIES, AMC HITKA ISLAND, ALASKA CANNIKIN D t 2 MONTHS REPORT Compiled by James B . K i r k w o o d and R. G l e n Fuller J u n e , 1972 P r e p a r e d for the U . S. A t o m i c E n e r g y C o m m i s s i o n under C o n t r a c t N o . AT(2b- 1 ) - 17 1 - - BATTELLE Columbus Labor a t o r ies 5 05 King Avenue C o l u m b u s , Ohio 4 3 2 0 1 P r i n t e d i n the United S t a t e s of America. A v a i l a b l e from N a t i o n a l Technical Information S e r v i c e U.S. Department of Commerce S p r i n g f i e l d , V i r g i n i a 22151 This r e p o r t was prepared a s a n account o f work sponsored by t h e United S t a t e s Government. Neither t h e United S t a t e s . - nor t h e United S t a t e s Atomic Energy Carrmission, nor any of

289

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

290

TITLE  

Office of Legacy Management (LM)

AMCHITKA BIOLOGICAL IWODlATION S AMCHITKA BIOLOGICAL IWODlATION S J M U I i Y Prspard for tho U. S. Atoric En~rny C d a a i o n undmr Contract No. A T (26-11-171 MTTkUE Colrubua LaboratoriRa 505 Kirq A V ~ R Collubua. Ohio 43201 Printed i n t h e U n i t d S t a t ~ of A l r r i w . A v a i h b l e f t o l - Nrtio-1 Technical I n f o r m t i o n Servic* U. S. D e p a r t u n t o f C o W t E P Sprinlf i a l d , v i + # i n b 22151 Thim r e p o r t naa p r e m r d a m an account of w x k mpon~ored by t h e United S t r t a a Goverrmmnt. Neithnr t h e Unltad S t a t e s nor the United Statem Atomic Energy Caminisaion, nor any of t h e i r employeem, nor any of t h e i r contractor#, subcontrac- t o r # , o r t h e i r eaployeea, makes any varranty, -press or implied, o r assumem any legal l i a b i l i t y o r r e s p o n s i b i l i t y f o r t h e accuracy. completsnnsn or usefulness of any infor- mation apparatus, product or precesa disclosed, or r

291

TITLE  

Office of Legacy Management (LM)

/ / m - 1 2 0 6 7 4 Department of Energy Oak Ridge *rations P.O. Box 2001 Oak Ridge, Tennessee 37831-8723 September 19, 1994 Hr. Saul Gleiser Ohio H i s t o r i c a l Society H i s t o r i c Preservation D i v i s i o n 1982 Yelma Avenue Columbus, Ohio 43211-2497 Dear Mr. Gleiser: ASSOCIATE AIRCRAFT SITE - NHPA (SECTION 106) DETERHINATION I n accordance w i t h Section 106 o f the National H i s t o r i c Preservation Act (NHPA), the Department o f Energy (WE) has determined t h a t the proposed removal o f r a d i o l o g i c a l contamination a t the former Associate A i r c r a f t s i t e located a t 3660 D i x i e Highway, F a i r f i e l d , Ohio, w i l l have no e f f e c t on properties included, o r e l i g i b l e f o r inclusion, on the National Register o f H i s t o r i c Places. A description o f proposed s i t e a c t i v i t i e s i s enclosed, along w

292

TITLE  

Office of Legacy Management (LM)

Certificafion Docket for the Certificafion Docket for the Remedial Action Performed af the Associate Aircraft Site, Fairfield, Ohio, 1994- 7 995 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office October 7 996 @ Prnleo m recynmrec)c*ahe paper CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE ASSOCIATE AIRCRAFT SITE, FAIRFIELO, OHIO, 1994-1995 OCTOBER 1996 Prepared for UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Oftice Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

293

TITLE  

Office of Legacy Management (LM)

10 G 10 G . Drexel/ M. Poligone F i l e no. 7315/124 s b j e c t Determination of Additional D o t e Contaminated Areas at AAS March 17, 1994 Copies to J. Allison G. Palau K. Thompson A. John At Oak Ridge Ext. 6-5173 The purpose of this memorandum is t o provide results from characterization activities at the Former Associated Aircraft Site (AAS) in Fairfield, Ohio. Additional areas of contamination requiring remediation were identified during these activities. Areas that are currently known to exhibit elevated readings, and were not in the original scope of work are shown in Figure 3. To summarize, the areas added are located in the following areas; North of Zone V in the bathroom area (north of the locker room) and the office (located north of the caged area)

294

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

295

TITLE  

Office of Legacy Management (LM)

1 111II1111111111111111111111111 1 111II1111111111111111111111111 GSB WW06 Floodplains and Wetlands Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 y :

296

TITLE  

Office of Legacy Management (LM)

OEce of Radiation and OEce of Radiation and 12nvirorunentai Protection Indoor Ailr Washington., DC 20460 Annual Water Sampling and Analysis, Calendar Year 2000: R'ULISON Tes,t Site Area RLO BLANCO Test Site Area FAULTLESS Tes it Site Area SHOAL Test Site Area GASBUGGY Test Site, Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2000 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AI08-96NV11969 UDIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR U.S. ENVIRONMENTAL PROTECTION AGENCY P.O. BOX 98517 LAS VEGAS, NV 89193-8517 NOTICE

297

TITLE  

Office of Legacy Management (LM)

, . . - . . t e d Copj UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Faderal Center, Llcewood, Colorado 80225 BATHYMETRY OF CANNIKIN LAKE, AnCRITU ISLAND. ALASKA, WITH AN EVALUATION OF COMPUTER MAPPING TECHNIQUES Don Digeo GonerLee, Leonard E. Wollltz, and G. E . Brerhauer CONTENTS Page A b s t r a c t . . . . . . . . . . . . . . . . . .. . . . . . . , . . . . . 1 I n t r o d u c t i o n . . . . . . . . . . . . . , . . . . . . . . . . . . . . 1 Acknowl.edgments . . . . . . . . . . . . . . . . . . . . . . . 5 Geologic and hydrologic s e t t i n g . . . . . . . . . - . . . . . . . . 5 Effects of Cannikin . . . . . . . . . . . . . . . . . . . . . . . 6. Bathymetry . . . . . . . . . . . . . . . . . . . . . . 8 Computerlnepping techniques . . . . . . . . . . . + . . . . . , . . 9 Comparison o f computer-mapping techniques . . . . . . . . . . . . .

298

TITLE  

Office of Legacy Management (LM)

Ill lllIlllllllllllllllllllllllIII1 Ill lllIlllllllllllllllllllllllIII1 SHL 000035 Letter Report Contaminant Boundary at the Shoal Underground Nuclear Test prepared by Greg Pohll and Karl Pohlmann Division of Hydrologic Sciences Desert Research Institute University and Community College System of Nevada submitted to Nevada Sitc O f i c e National Nuclear Security Administration U.S. Deparuncnt of Enagy Las Vegas, Nevada August 6,2004 The work upon which this report is based was suppomd by the U.S. Department of Energy under Contract #DE-AC52-OONVI3609; intended for limited distribution. Reference herein to any specific commercial product, process, or service by trade name, trademark, n~anuC;lcturcr, or otherwise, does not necussuily constitute or imply its endorsement, recommendation, 01. favoring by the Unitcd States Govcmmcnl or any agcncy thereof ur its

299

TITLE  

Office of Legacy Management (LM)

~ ~ ~erivation of ~uidelines for Uranium Residual Radioactive Material in soil at the B&T Metals Company Site, Columbus,. Ohio Environmental Assessment Division f i Argonne National Laborgory Operated by The Unlvenlty of ChCago. under Contract w-31-109-Eng-38, lor tne United States Department of Energy Derivation of Guidelines for Uranium Residual Radioactive Material in Soil at the B&T Metals Company Site, Columbus, Ohio by S. Kamboj. M. Nimmagadda, and C. Yu Env~ronmental Assessment Division. Argonne National Laboratory, 9700 South Cass Avenue. Argonne. Illinois 60439 January 1996 Work sponsored by U.S. Depanment of Energy. Office of Environmental Restoration, Washington, D.C. ; CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

300

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

TITLE  

Office of Legacy Management (LM)

68 68 OFF C . 2 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1993 . I \ . j Environmental Restoration Sensitive Species Su wey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico December 1 993 Environmental Restoration 1 Sensitive Species Survey Results for the Gasbuggy and Gnome-Coach Sites, New Mexico Prepared for: U.S. Deparunenr of Energy Environmental Restoration Division DOE Nevada Operations Officc Las Vegas, Nevada 89193-851 8 Prepared by: I T CORPORATION 4330 S. Valley View Blvd.. Suite 114 Las Vegas, Nevada 89 103 Work Pcrformcd undcr Contract No. DE-AC08-92NV10972 Table of Contents List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii ... List of Tables . . . . . . . . . . .

302

TITLE  

Office of Legacy Management (LM)

902 902 GEN-BKS - - - . I 111 111 111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 l l Ill SHL 000024 United States Office of Radiation and EPA-402-R-94-001 Environmental Protection Indoor Air January 2004 Agency Washington, DC 20460 Annual Water Sampling and Analysis, Calendar Year 2003: SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RI0 BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 2003 SHOAL Test Site Area FAULTLESS Test Site Area RULISON Test Site Area RIO BLANCO Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Max G. Davis Terry L. Mouck Prepared for the U. S. Department of Energy under Interagency Agreement DE-,4108-96NV11969 RADIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY

303

TITLE  

Office of Legacy Management (LM)

POST-REMEDIAL ACTION REPORT POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAJT SITE Fairfield, Ohio Bechtel National, Inc. POST-REMEDIAL ACTION REPORT FOR THE ASSOCIATE AIRCRAFT SITE FAIRFIELD. OHIO JULY 1996 Prepared for United States Depariment o f Energy Oak Ridge Operations Off= Under Contract No. DE-AC05-910R2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1 . 1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . 3 2.0 REMEDIAL ACTION GUIDELINES .

304

TITLE  

Office of Legacy Management (LM)

T T O G. L. Palau Subject Scoping Notice: The B&T Metals Site, Columbus, Ohio F i l s No. 744011 13 ~ a t t February 26, 1996 F P m l D. D. Sexton b of Environmental Compliance EX^. Oak Ridge ~t 4-3643 BACKGROUND The purpose of this Scoping Notice is to formalize the identification and evaluate the application of federal and state rulcs and regulations that apply to the cleanup of the B&T Metals site, located in Columbus, Ohio. This environmental compliance evaluation is based on information contained in the Designation Summary of the site (CCN 095792), which provides the nature and extent of radiological contamination, and upon an Engineering and Technology preliminary draft characterization report which identifies the presence and type of chemical and radioactive mixed waste present at the site.

305

TITLE  

Office of Legacy Management (LM)

Floodplains and Wetlands Floodplains and Wetlands Survey Results for the Rulison and Rio Blanco Sites, Colorado December 1 993 Environmental Restoration Floodplains and Wetlands Survey Results tor the Rulison and Rio Blanco Sites, Colorado Prepared For: U.S. Department of Energy Environmental Restoration Division DOE Nevada Operations Office Las Vegas, Nevada 89 193-85 18 Prepared By: l T CORPORATION 4330 S. Valley View Blvd., Suite 114 Las Vegas, Nevada 89 103 Work Performed under Contract No: DE-AC08-92NV 10972 December 1993 Table of Contents . . List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii List of Acronyms and Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

306

Title  

Gasoline and Diesel Fuel Update (EIA)

External Developments Division External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem Energy Information Administration 24 August 2011 by Marco J. Lombardi and Ine van Robays European Central Bank and Ghent Univeristy 2 Motivation * Oil price surged with increasing momentum between 2003-2008 before falling in the wake of the financial crisis and the subsequent economic downturn. After that, prices recovered again. * Oil price increases came against the background of surging demand and stagnating supply. 0 20 40 60 80 100 120 140 2000M01 2001M01 2002M01 2003M01 2004M01 2005M01 2006M01 2007M01 2008M01 2009M01 2010M01 spot oil price in USD/barrel 3 Financialization of oil * The financialization

307

title  

NLE Websites -- All DOE Office Websites (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

308

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

Watec Resources Canter Watec Resources Canter 1 I EVALUATION OF GROUNDWATER FLOW AND TRANSPORT AT THE FAULTLESS UNDERGROUND NUCLEAR TEST, CENTRAL NEVADA TEST AREA I prepared by I Karl P o h l m a ~ , Jenny Chapman, Ahmed Hassan, and Charalambos Papelis ! submitted to Nevada Operations M c e U.S. Department of Energy SEPTEMBER 1999 Publication No. 45165 @ C F J C This report uas prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any o f their contractors, subaontractors or their employees, makes any warranty, express M implied, or assumes any It@ Liability or responsibility for the accuracy, oompletenesr, or any third party's use or the results of such use of m

309

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recipients Recipients 1 Outline of Presentation * Basic Background on Recovery Act * OMB Reporting Requirements * Timeline * Jobs Guidance * FederalReporting.gov * Available Resources * Detailed Review of Reporting Template and Field by Field Guidance 2 Overview On February 17, 2009, President Obama signed the American Recovery and Reinvestment Act, along with an Executive Order establishing the Economic Recovery Advisory Board

310

TITLE  

Office of Legacy Management (LM)

. . . . . . . 7 AEC ANL ARC BNI W E ERDA FUSRAP HED cm dpm f t g in. m mrem pci Atomic Energy Commission Argonne National Laboratory Albany Research Center Bechtel National, Inc....

311

TITLE  

Office of Legacy Management (LM)

TO Distribution Subject EIN: Ohio Hazardous Waste Regulations Copier t o G. R. Galen G. L. Palau F i l e No. 7440124, 135 ate January 10, 1995 Frm D. D. Sexton TDS of ES&H t Oak...

312

TITLE  

Office of Legacy Management (LM)

point (CP), and the h e l i c o p t e r pad were located on lands within the Carson National Forest. The use of these lands f o r the Gasbuggy P r o j e c t was established i...

313

Title:  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Society (2008), 130(4), 1507-1516 Tsapatsis, Michael; Maheshwari, Sudeep; Bates, Frank S.; Koros, William J. Layered zeolite materials and methods related thereto....

314

TITLE  

Office of Legacy Management (LM)

Cwmr . lwlales lha mntamhwna from the envlronmant by m d n p a m U layer war the drllng mud p h . . Reducss fulurm mbratbn by diidlng surlsca water hom the drMing mrvl MI....

315

TITLE  

Office of Legacy Management (LM)

TAKE- s - United States Department of' h e Interior - - FISH AND WII.,DLIFE SEKWC:E am I I 4600 Kiotrk. Lam, Building C-125 -no, e v a d a 89502-5093 SHL 000036 January 13,...

316

TITLE  

Office of Legacy Management (LM)

Primary cosmic radiation consists of '*g&lactic1' particles externally incident on the solar system, and "solar" particles emitted by the sun. This radiation is corposed primarily...

317

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

button next to each profile. STEP 4. Reviews the Worker's JHA and click the Make Changes Button next to each Group or Individual section to update that section. Only the Work...

318

TITLE  

Office of Legacy Management (LM)

ELEV: 7000 ft LAT: 37 54' 00" N LONG: 109 18' 00" w TEMPERATURE (OF)' RAIN (in), WIND SPEED (mph) HEAT COOL AVG MEAN DEG DEG WIND DOM DAY TEMP HIGH TTME LOW TIME DAYS DAYS...

319

Title  

National Nuclear Security Administration (NNSA)

initiation of explosives occurs by two different mechanisms-either hot spotbased or thermal explosion-based-depending on microstructure. Studies on a large number of explosive...

320

TITLE  

Office of Legacy Management (LM)

Departmentaof n e r Washington, DC 20585 IdkY O 3 1993 Mr. James Besl President Force Control Industries 3660 D i x i e Hrghway F a i r f i e l d , Ohio 45014 Dear M r . Besl...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

TITLE  

Office of Legacy Management (LM)

Colorado History Co-sponsored by the U.S. Atomic Energy Commission (AEC) and Austral Oil Company under the Plowshare Program, Project RULISON was designed to stimulate natural...

322

Title  

Annual Energy Outlook 2012 (EIA)

External Developments Division Do financial investors destabilize oil prices? The opinions expressed here are personal and not necessarily shared by the ECB or the Eurosystem...

323

TITLE  

Office of Legacy Management (LM)

R i i e . Tennessee 37831 -8723 J u l y 18, 1995 Mr. Graham H i t c h e l l , Environmental Manager Ohio Envi r o n e n t a l Protection llgency Southwest O I s t r i c t O f f l c...

324

TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

I - DOEMr13609-27 a r n w s a r a s w n r m l l f i h l l CNT 000047 A Validation Process for the Groundwater Flow and Transport Model of the Faultless Nuclear Test...

325

TITLE  

Office of Legacy Management (LM)

1057 WEST FIREWEED LANE. ANCHORAGE. ALASKA 99603. TEL. 1 9 0 1 1 ZS7-5m(l hmmm& S p a d k r s n the Enmonmsm 7 " C W -I Section ... 2 SITE...

326

TITLE  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REHEDIAL ACTION PROSRAN IW DECOHTMIHATI OH AND DE?OWISSIONING P R O G M (Revision 3, Nowember, 1930) I L - I This p r o t o c o l o u t l i n e s the...

327

TITLE  

Office of Legacy Management (LM)

Ohio TO: The F i l e The attached review documents the basis f o r determining whether DOE has a u t h o r i t y f o r t a k i n g remedial a c t i o n a t the BaT Metals f a c i...

328

TITLE  

Office of Legacy Management (LM)

O Distribution pile 10. 7 4 4 0 1 2 4 , 135 s & ; t EIN: Ohio azardous D I C February 6 . 1995 Waste Regulat ions; Empty Container Rule r - D . D. Sexton C-ics lo T. E....

329

TITLE  

Office of Legacy Management (LM)

pub1 i c meetings on the nature o f cleanup measures, waste. management, and waste transportation routes, i n t e r v i e w s and discussions w i t h ARC employees and management,...

330

TITLE  

Office of Legacy Management (LM)

that the Albany rite was contaminated above current pufdelines. An aerial radiological survey conducted In Februuy 1980 did not indicate the presence of ndfoactive contamination i...

331

TITLE  

Office of Legacy Management (LM)

of buildings in the northern and central portions of the site; a 0.8-ha (2-acre) biomass research facility (inactive) located south of the site's approximate center; and a...

332

TITLE  

Office of Legacy Management (LM)

Survev of the Albany etallurgical Research Center United States Bureau of Wines Biomass Facility and the "Back Forty" Area, Albany, Oregon. DOEEV-000539. June 1983. 4 ....

333

TITLE  

Office of Legacy Management (LM)

in the northern and central sections of the site; an inactive 0.8-ha (2-acre) biomass research facility located at the site's approximate center; and a 5.7-ha (14-acre)...

334

TITLE  

Office of Legacy Management (LM)

site consists of three main areas: ARC proper, the main research facility; the former Biomass Research Facility which consists of approximately O.&ha (2-acre), located wuth of the...

335

TITLE  

Office of Legacy Management (LM)

of buildings in the northern and central sections of the site: a 0.8-ha (2-acre) biomass research facility (inactive) located at the site's approximate center; and a 5 . 7 -...

336

TITLE  

Office of Legacy Management (LM)

and central portions of the site; a 0.8-ha (2-acre) area that once contained a biomass research facility (decommissioned) in the southern portion: and an open area...

337

TITLE  

Office of Legacy Management (LM)

e r n m o s t 29 a c r e s of t h e p r o p e r t y : a 2 - a c r e , i n a c t i v e BioMass R e s e a r c h F a c i l i t y , l o c a t e d n e a r t h e c e n t e r of t h e p...

338

TITLE  

Office of Legacy Management (LM)

of buildings in the northernmost 12 ha (29 acres) of the site: the .8-ha (2-acre) Biomass Research Facility FIGURE 1-1 PLAN VIEW OF THE ALBANY RESEARCH CENTER FUSRAP 14501...

339

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Path) ARPA-E is currently running four FOAs - three focused and one broad 6 Vehicle Storage + Home Refueling < 2000 Methane Opportunities for Vehicular Energy (MOVE)...

340

title  

Science Conference Proceedings (OSTI)

... Terrorism, Unconventional Threats and Capabilities Subcommittee. March 24, 2009. CLO-05-002-RevV. 10. situation with DOD healthcare IT. 11. ...

2013-04-26T23:59:59.000Z

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

models, and set a standard process for budget and staffing development to allow some learning curve savings to take place Stop making rules without considering the needs...

342

Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rail * Supercapacitor for Load & DG Integration * Flow Battery for T&D Deferral * Flywheel for Area Regulation * Outlook EESAT 2007 - Eyer - DUA 3 Scope * DOE ESS partnership...

343

Title........................  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at

Larry Brand; In Paper; Larry Brand

2012-01-01T23:59:59.000Z

344

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5.1 Records Search 5-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

345

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Committee Meeting 3232011 1:16 PM 17 Research Teams Advanced Combustion *Oxy-fuel, Co-firing *Oxy: Materials *USC: Materials *Chemical Looping *Advanced Concepts Advanced...

346

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

in siting. The specific requirements are: 1. 480V-3Ph-60Hz electrical supply (75 kVA, 90A transformer) 2. Potable water 3. Instrument air: 150 psig 4. Instrument nitrogen: 150 psig...

347

Report Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data  

E-Print Network (OSTI)

Data Report Type: Annual Technical Report Reporting Period Start Date: October 1, 2000 Reporting PeriodReport Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic, Ruijian Li, Yafes Abacioglu & Yannong Dong Date Report Issued: December 2001 DOE Award Number: DE-FC26

Reynolds, Albert C.

348

National Ignition Facility Title II Design Plan  

Science Conference Proceedings (OSTI)

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

349

Public Utility Commission Regulation and Cost-Effectiveness of Title IV: Lessons for CAIR  

SciTech Connect

There is growing evidence that the cost savings potential of the Title IV SO{sub 2} cap-and-trade program is not being reached. PUC regulatory treatment of compliance options appears to provide one explanation for this finding. That suggests that PUCs and utility companies should work together to develop incentive plans that will encourage cost-minimizing behavior for compliance with the EPA's recently issued Clean Air Interstate Rule.

Sotkiewicz, Paul M.; Holt, Lynne

2005-10-01T23:59:59.000Z

350

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

351

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

352

Research Highlights Sorted by Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title Title "Invisible" Giants in the Sky ARM ASR Kassianov, E. "Radiance Assimilation" Correction Method Improves Water Vapor Radiosonde Observations in the Upper Troposphere ARM Soden, B. J. "Roobik" Is Part of the Answer, Not a Puzzle ARM Turner, D. D. 2007 Floods Not a Complete Washout in U.S. Great Plains ARM ASR Bhattacharya, A. A "Little" Respect: Droplet Nucleation Finally Included in Global Climate Model ARM Ghan, S. J. A Bulk Parameterization of Giant Cloud Condensation Nuclei ARM Kogan, Y. A Climatology of Midlatitude Continental Cloud Properties and Their Impact on the Surface Radiation Budget ARM Dong, X. A Comparison of Integrated Water Vapor Sensors: WVIOP-96 ARM Liljegren, J. C. A Consistency Analysis of ARESE Aircraft Measurements ARM

353

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

354

Date: _______________ Vendor Name: _______________________________  

E-Print Network (OSTI)

: ________________________ City, State, Zip:_______________________ Phone # : __________________ Fax, Nuclear Magnetic Resonance e. ___ Fire Safety-Extinguishing Systems, Bldg. Security Alarm Systems on ReX Released Re-released Faxed to Purchasing Date Initials 6-15-11 REV 0.00 0.00 0.00 0.00 0.00 0

Fabrikant, Sara Irina

355

NOTICE OF PROPOSED REGULATION Date: February 20, 2013  

E-Print Network (OSTI)

1 NOTICE OF PROPOSED REGULATION Date: February 20, 2013 REGULATION TITLE: REGULATION NO.: Student of fees, records and registration errors, student employment, and violation of University of Florida be reported to the student in writing and shall inform the student of the right to seek review

Mazzotti, Frank

356

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: May 27, 2009  

E-Print Network (OSTI)

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: May 27, 2009 REGULATION TITLE: REGULATION NO, while time alone is not sufficient to justify an emergency regulation, it is important to the fiscal in the Appropriations Act. The University must proceed with the regulation authorizing tuition increases on an emergency

Roy, Subrata

357

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: June 10, 2010  

E-Print Network (OSTI)

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: June 10, 2010 REGULATION TITLE: REGULATION NO is not sufficient to justify an emergency regulation, it is important to the fiscal welfare of the University with the regulation authorizing tuition and fee increases on an emergency basis. REASONS FOR CONCLUDING

Roy, Subrata

358

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: June 2, 2008  

E-Print Network (OSTI)

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: June 2, 2008 REGULATION TITLE: REGULATION NO is not sufficient to justify an emergency regulation, it is important to the fiscal welfare of the University. The University must proceed with the regulation authorizing tuition increases on an emergency basis. REASONS

Roy, Subrata

359

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: June 7, 2011  

E-Print Network (OSTI)

NOTICE OF EMERGENCY REGULATION AMENDMENT Date: June 7, 2011 REGULATION TITLE: REGULATION NO an emergency regulation, it is important to the fiscal welfare of the University and the State of Florida tuition and fee increases on an emergency basis. REASONS FOR CONCLUDING THAT THE PROCEDURE USED IS FAIR

Roy, Subrata

360

NOTICE OF EMERGENCY REGULATION Date: August 10, 2005  

E-Print Network (OSTI)

NOTICE OF EMERGENCY REGULATION Date: August 10, 2005 REGULATION TITLE: REGULATION NO.: Tuition Cost an emergency regulation, it is important to the fiscal welfare of the University and the State of Florida with the regulation authorizing tuition increases on an emergency basis. REASONS FOR CONCLUDING THAT THE PROCEDURE

Roy, Subrata

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Release Date: August 2010 Next Release Date: August 2011  

U.S. Energy Information Administration (EIA)

Release Date: August 2010 Next Release Date: August 2011 U.S. Energy Information Administration/Renewable Energy Annual 2008 Table 1.14 Total Biomass Electricity Net ...

362

Capping of Water Wells for Future Use  

E-Print Network (OSTI)

Water wells that are not being used, but that might be needed in the future, can be sealed with a cap that covers the top of the well casing pipe to prevent unauthorized access and contamination of the well. This publication explains how to cap a well safely and securely.

Lesikar, Bruce J.; Mechell, Justin

2007-09-04T23:59:59.000Z

363

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

364

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

365

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

366

G Subject: Implementation of Division F, Title I, Title II, and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113- References: Consolidated and Further Continuing...

367

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 .- POLICY FLASH 2010-62 1 July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management Revised DOE Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

368

File:Title V Checklist.pdf | Open Energy Information  

Open Energy Info (EERE)

Title V Checklist.pdf Title V Checklist.pdf Jump to: navigation, search File File history File usage File:Title V Checklist.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 45 KB, MIME type: application/pdf, 7 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:29, 1 November 2012 Thumbnail for version as of 11:29, 1 November 2012 1,275 × 1,650, 7 pages (45 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file.

369

Environmental Assessment Addendum For the Proposed Title Transfer of Parcel ED-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-A 3-A ENVIRONMENTAL ASSESSMENT ADDENDUM FOR THE PROPOSED TITLE TRANSFER OF PARCEL ED-1 April 2003 U.S. Department of Energy Oak Ridge Operations Oak Ridge, Tennessee 02-088(doc)/040203 DOE/EA-1113-A ENVIRONMENTAL ASSESSMENT ADDENDUM FOR THE PROPOSED TITLE TRANSFER OF PARCEL ED-1 Date Issued-April 2003 U.S. Department of Energy Oak Ridge Operations 02-088(doc)/040203 iii CONTENTS FIGURES..................................................................................................................................................... iv TABLES ...................................................................................................................................................... iv

370

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

371

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I Nevada Rail Corridor SEIS Rail Alignment EIS - Chapters 1 and 2 U.S. Department of Energy Office of Civilian Radioactive Waste Management June 2008 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2; the Nevada Rail Corridor SEIS), and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369; the Rail Alignment EIS) CONTACTS: For more information about this document, For general information on the DOE NEPA process,

372

crd title p1.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SHEET SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2D; the Nevada Rail Corridor SEIS), and Draft Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada (DOE/EIS-0369D; the Rail Alignment EIS) CONTACTS: For more information about this document, write or call: For general information on the DOE NEPA process, write or call: U.S. Department of Energy Office of Civilian Radioactive Waste Management

373

Control Measure Title Reference Number *  

E-Print Network (OSTI)

exhaustive search for emissions reductions to use in meeting federal Clean Air Act requirements for this 2008 PM2.5 Plan. Chapter 6 details the Districts process for developing control measures for reducing emissions of primary PM2.5 and PM2.5 precursors. This Appendix presents the product of this process: a master list of all candidate control measure ideas identified and evaluated for this plan. After assembling Appendix I, the District then screened the candidate measures into several categories: high priority measures to be implemented in the years immediately following plan adoption; measures that might be implemented in future years to allow for expected technology development; and those measures that require further study to identify when they could be implemented and what reductions they could achieve. Candidate control measure descriptions in Appendix I have the following major components:! Title and Number

unknown authors

2008-01-01T23:59:59.000Z

374

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

375

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

376

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

377

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

378

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

379

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

380

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

382

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

383

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

384

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

385

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

386

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

387

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

388

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

389

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

390

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

391

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

392

Ph.D Viva 20072008 Name Deptt/Center Date/TimeVenue Title  

E-Print Network (OSTI)

& Engineering August 1, 2008, 11:30 AM Committee Room, CPSE Studies on PSU/HDPE Blends and Mica Reinforced, Dept.of Civil Engg. Liquefaction resistance and dynamic properties of coal ash. Ms Rekha Centre

Kumar, M. Jagadesh

393

4. Title and Subtitle 5. Report Date MEASURING THE EQUITY AND EFFICIENCY OF RAMP METERS  

E-Print Network (OSTI)

Traffic congestion has become an increasingly serious problem in many cities. Ramp metering, which maintains smooth freeway mainline flow by limiting vehicle entry at entrance ramps, has been proposed and implemented in a number of metropolitan areas in and outside the U.S. to mitigate freeway congestion. This study aims to develop both efficient and equitable freeway ramp control strategies. Traffic conditions with and without ramp metering are evaluated on several representative freeways in the Twin Cities with a comprehensive set of performance measures. A unified theory for ramp metering is proposed based on a linear programming model of freeway traffic dynamics. The most efficient ramp control algorithm is found to be also the least equitable one. A novel control objective, minimizing weighted or perceived travel time, is therefore proposed to balance efficiency and equity objectives of ramp metering. This research also develops a new family of applicable ramp metering strategies, which consider both efficiency and equity, and are demonstrated in a microscopic traffic simulator. Future studies should compare various traffic control methods under the analytical framework proposed in this report. Researchers should also pursue field experiments of the proposed multi-objective ramp control strategies.

unknown authors

2004-01-01T23:59:59.000Z

394

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

194: Categorical Exclusion Determination 194: Categorical Exclusion Determination Install Demonstration Wind Turbine at Weldon Spring, Missouri, Site CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Weldon Spring, Missouri Office(s): Legacy Management April 28, 2010 CX-002121: Categorical Exclusion Determination Ingersoll Milling Machine Upgrade and Equipment For Windmill Rotor Hubs and Spar Caps CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Rockford, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 27, 2010 CX-001932: Categorical Exclusion Determination Laramie County Community College Utility-Scale Wind Energy Technology CX(s) Applied: B3.6, A9 Date: 04/27/2010 Location(s): Wyoming Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 27, 2010

395

Perfluorocarbon vapor tagging of blasting cap detonators  

DOE Patents (OSTI)

A plug for a blasting cap is made of an elastomer in which is dissolved a perfluorocarbon. The perfluorocarbon is released as a vapor into the ambient over a long period of time to serve as a detectable taggant.

Dietz, Russell N. (Shoreham, NY); Senum, Gunnar I. (Patchogue, NY)

1981-01-01T23:59:59.000Z

396

Perfluorocarbon vapor tagging of blasting cap detonators  

SciTech Connect

A plug for a blasting cap is made of an elastomer in which is dissolved a perfluorocarbon. The perfluorocarbon is released as a vapor into the ambient over a long period of time to serve as a detectable taggant.

Dietz, R.N.; Senum, G.I.

1981-03-17T23:59:59.000Z

397

CapStar Health System Feedback Report  

Science Conference Proceedings (OSTI)

... and CapStar's daily briefings are patterned after those of a hotel industry leader. ... results on readmission rates shown in Figure 7.4-5, the utility of the ...

2013-06-09T23:59:59.000Z

398

CeCap LLP | Open Energy Information  

Open Energy Info (EERE)

search Name CeCap LLP Place London, United Kingdom Zip W1S 2LQ Product London-based investment boutique which provides investment advice to, and invests in, small to mediun size...

399

Using EnergyPlus for California Title-24 compliance calculations  

NLE Websites -- All DOE Office Websites (Extended Search)

Using EnergyPlus for California Title-24 compliance calculations Title Using EnergyPlus for California Title-24 compliance calculations Publication Type Conference Paper LBNL...

400

POSTER DESCRIPTION: Poster Title: "Distributed Electric Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

DESCRIPTION: Poster Title: "Distributed Electric Power from Bio-based and Fossil Fuels" Entity: Technology Management, Inc. 9718 Lake Shore Blvd., Cleveland, Ohio 44108 Author(s):...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Berkeley Lab's "Draft" Sustainability Strategy (Title TBD)  

NLE Websites -- All DOE Office Websites (Extended Search)

Berkeley Lab's "Draft" Sustainability Strategy (Title TBD) NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be updated until...

402

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlcapped at ground level, and a new well will be drilled environment] using water based mud. The existing rat I mouse hole on the site will be backfilled. A new 6700 ft3 reserve pit [80' long by 30' wide by 4' deep allowing for 2' of freeboard] will be constructed on location. and a 12 mm 2. Legal location liner will be installed. 3. Duration of the project 4. Major equipment to be used

403

F.2 DOCUMENT CHARACTERISTICS TITLE  

E-Print Network (OSTI)

eam3gui3_e20_ri_web Edition Number 2.0 Edition Date 21-03-2006 The previous versions of EAM 3 / GUI 3 were produced before the approval of ESARR 1 and the entry into force of the SES Regulations. As such, their enactment has necessitated a review of the documentin order to ensure its consistency with this new regulatory material. As a first step in this review process, the SRC has produced this version of EAM 3 / GUI 3 to include a new table with guidance on the criteria for the assessment of compliance with ESARR 3. This table replaces the former highlevel checklists included in previous versions of the document. Apart from the new table, no other contents have currently been modified. However, it is intended to produce a fully revised version of EAM 3 / GUI 3 to provide NSAs with guidance on the safety oversight of ESARR 3-related requirements.

Eam Gui; Eam Gui

2006-01-01T23:59:59.000Z

404

News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 UMTRCA Title I and Title II Disposal Sites 2010 UMTRCA Title I and Title II Disposal Sites Reports Available News Release: 2010 UMTRCA Title I and Title II Disposal Sites Reports Available February 23, 2011 - 9:51am Addthis News Contact: DOE, Rich Bush, UMTRCA Program Lead (970) 248-6073 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 Grand Junction, Colo. - The U.S. Department of Energy announces the availability of the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites and the 2010 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites reports. In 2010, DOE's Office of Legacy Management was responsible for providing long-term surveillance and maintenance services at 25 uranium mill tailings

405

Metadata of the chapter that will be visualized online Chapter Title Seismic Monitoring of Nuclear Explosions  

E-Print Network (OSTI)

Metadata of the chapter that will be visualized online Chapter Title Seismic Monitoring of Nuclear Page Number: 0 Date:20/9/10 Time:20:22:18 1 S 2 SEISMIC MONITORING OF NUCLEAR EXPLOSIONSAu1 3 Paul G Administration, Beijing, China 6 Introduction 7 The original development of nuclear weapons, and their 8 first

Foulger, G. R.

406

Radiocarbon dating, memories, and hopes  

SciTech Connect

The history of radiocarbon dating from 1939 to the present is reviewed. The basic principles of radiocarbon dating are that cosmic rays make living things radioactive with {sup 14}C to a certain level fixed by the environment and that at death the intake of food stops so no replenishment of the {sup 14}C steadily lost by the immutable decay occurs. Therefore measurement of the degree of decay gives the time lapse since death, i.e., the radiocarbon age. The equipment developed and experiments performed to measure the specific activity of specimens to be dated are described. The results obtained by world-wide experimenters are discussed. These showed that on simultaneity radiocarbon dating is apparently reliable but that absolute dates may be incorrect by as much as 600 to 700 y. The value of radiocarbon dating to archaeologists, geologists, climatologists, and historians is stressed. (LCL)

Libby, W.F.

1972-01-01T23:59:59.000Z

407

Dates Fact Sheet.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

crossing. This enhances an asset owner's situational awareness capability beyond simple event detection and log management. The DATES monitoring platform uses multiple algorithms...

408

Next Release Date: September 2012  

Annual Energy Outlook 2012 (EIA)

October 2010 DOEEIA-0121 (201002Q) Next Release Date: September 2012 Revised: July 2012 Quarterly Coal Report April - June 2010 October 2010 U.S. Energy Information...

409

Nuclear waste vitrification efficiency: cold cap reactions  

SciTech Connect

The cost and schedule of nuclear waste treatment and immobilization are greatly affected by the rate of glass production. Various factors influence the performance of a waste-glass melter. One of the most significant, and also one of the least understood, is the process of batch melting. Studies are being conducted to gain fundamental understanding of the batch reactions, particularly those that influence the rate of melting, and models are being developed to link batch makeup and melter operation to the melting rate. Batch melting takes place within the cold cap, i.e., a batch layer floating on the surface of molten glass. The conversion of batch to glass consists of various chemical reactions, phase transitions, and diffusion-controlled processes. These include water evaporation (slurry feed contains as high as 60% water), gas evolution, the melting of salts, the formation of borate melt, reactions of borate melt with molten salts and with amorphous oxides (Fe2O3 and Al2O3), the formation of intermediate crystalline phases, the formation of a continuous glass-forming melt, the growth and collapse of primary foam, and the dissolution of residual solids. To this list we also need to add the formation of secondary foam that originates from molten glass but accumulates on the bottom of the cold cap. This study presents relevant data obtained for a high-level-waste melter feed and introduces a one-dimensional (1D) mathematical model of the cold cap as a step toward an advanced three-dimensional (3D) version for a complete model of the waste glass melter. The 1D model describes the batch-to-glass conversion within the cold cap as it progresses in a vertical direction. With constitutive equations and key parameters based on measured data, and simplified boundary conditions on the cold-cap interfaces with the glass melt and the plenum space of the melter, the model provides sensitivity analysis of the response of the cold cap to the batch makeup and melter conditions. The model demonstrates that batch foaming has a decisive influence on the rate of melting. Understanding the dynamics of the foam layer at the bottom of the cold cap and the heat transfer through it appears crucial for a reliable prediction of the rate of melting as a function of the melter-feed makeup and melter operation parameters. Although the study is focused on a batch for waste vitrification, the authors expect that the outcome will also be relevant for commercial glass melting.

Hrma, Pavel R.; Kruger, Albert A.; Pokorny, Richard

2012-12-15T23:59:59.000Z

410

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 CX-001341: Categorical Exclusion Determination Reaction Chemistry and Engineering Support Laboratory B94-02 CX(s) Applied: B3.6 Date: 03/16/2010 Location(s): South Park, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory March 16, 2010 CX-001918: Categorical Exclusion Determination Market 5: Promote the Use of Green and Renewable Energy Generation Facilities, Products, and its Supply Chain for the Purpose of Reducing Greenhouse Gases CX(s) Applied: B1.31, B5.1 Date: 03/16/2010 Location(s): Tipton, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 16, 2010 CX-001902: Categorical Exclusion Determination Biofuels Development Market Title - Marquis Energy, LLC CX(s) Applied: B5.1 Date: 03/16/2010 Location(s): Hennepin, Illinois

411

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 CX-007401: Categorical Exclusion Determination Automatic AC Voltage Stabilization Using Photovoltaic (PV) Inverter Control to Mitigate the Variability of Real Power from PV Sources and Improve Existing Power Quality on the Distribution System CX(s) Applied: A9, B3.6 Date: 12/07/2011 Location(s): Massachusetts Offices(s): Golden Field Office December 7, 2011 CX-007400: Categorical Exclusion Determination Offshore Wind Removing Market Barriers CX(s) Applied: A9 Date: 12/07/2011 Location(s): Massachusetts Offices(s): Golden Field Office December 7, 2011 CX-007488: Categorical Exclusion Determination Appliance Rebates Market Title CX(s) Applied: A1, B5.1 Date: 12/07/2011 Location(s): Virginia Offices(s): National Energy Technology Laboratory December 7, 2011 CX-007434: Categorical Exclusion Determination

412

Low flammability cap-sensitive flexible explosive composition  

DOE Patents (OSTI)

A cap-sensitive flexible explosive composition of reduced flammability is provided by incorporating a finely divided, cap-sensitive explosive in a flame resistant polymeric binder system which contains a compatible flame retardant material.

Wagner, Martin G. (Wilmington, DE)

1992-01-14T23:59:59.000Z

413

Sediment Capping Resource Guide for Manufactured Gas Plant Sites  

Science Conference Proceedings (OSTI)

This report describes tools and techniques applicable to design and implementation of sediment capping remedies at former manufactured gas plant (MGP) sites. It includes a number of practical case studies describing cap designs and cap construction experience. The report is intended as a sediment capping resource guide to be used with EPRI's 2007 Handbook of Remedial Alternatives for MGP Sites with Contaminated Sediments (EPRI report 1012592).

2008-11-18T23:59:59.000Z

414

104th Dates to Remember  

Science Conference Proceedings (OSTI)

Questions? Contact Connie Hilson, AOCS Exhibits Specialist, by email: connieh@aocs.org or by phone: +1 217-639-4831. Dates to Remember * January 7, 201/span>3 Online registration opens January 15, 201/span>3 Exhibitor presentations: Deadl

415

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

covers competitions. Word versions of the four templates will be available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

416

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

417

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the fourteen aforementioned RFP Section L and M templates are available in STRIPES as part of the series of DOE-L-1024 or DOE-M-1005 clauses. This Flash will be...

418

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the three aforementioned RFP Section H and L templates are available in STRIPES. This Flash will be available online within a day, at the following website: http:...

419

Dates:  

NLE Websites -- All DOE Office Websites (Extended Search)

of the determinants of fire behavior though studying inputs (weather, slope, fuels, and fuel moisture); learn how to interpret fire behavior outputs; documentation processes; &...

420

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

422

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

existing technologies to advance weld quality monitoring and closed loop feedback for welding systems and techniques typically used in the nuclear industry. 9. Stress Corrosion...

423

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed without further CRM office involvement. Generating and Managing Waste - Industrial waste in the form of general construction debris such as waste concrete, scrap...

424

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

owners rely on and hold contracts with Western for access to affordable and reliable bulk power supply from the Pick Sloan hydro electric system and transmission service from the...

425

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase...

426

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Managing Waste: Wooden material wastes would be generated from dimension lumber, plywood and particle board. No regulated wastes (e.g. chemicals, asbestos) are anticipated to...

427

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CERCLA Disposal Facility or at an approved off-Site facility through Waste Generator Services. 19. Work within areas Subject to Flooding - Since the well abandonment work is...

428

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPA filters. These materials will be packaged and disposed of through Waste Generation Services. 19. Work in Areas Subject to Flooding - The activities discussed are planned to...

429

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B....

430

Date  

E-Print Network (OSTI)

This Design Manual Chapter 1620 Supplement is to revise WSDOT policy relating to the selection of impact attenuator systems. If you maintain a printed manual, please remove the current Chapter 1620 and replace it with the August 2011 Supplement. To get the latest information on WSDOT administrative and engineering manuals, sign up for

unknown authors

2011-01-01T23:59:59.000Z

431

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Accumulation Areas (SAAs) or a <90-day storage areas before shipping to a treatment, storage, and disposal facility (TSDF). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL...

432

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will pack, move, setup, and test the NGWTB electronic equipment. In addition, the propane tank located at CFA-666 will be relocated to CFA-661. Three propane heaters and...

433

Date  

E-Print Network (OSTI)

This thesis has been reviewed by the research advisor, research coordinator, and department chair and has been found to be satisfactory.

Clark David; Wilson Blockburger

2006-01-01T23:59:59.000Z

434

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

435

Title I implementation: Status report on nonattainment areas  

SciTech Connect

Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA's new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency's (EPA's) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO[sub x]) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO[sub x] to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO[sub x] control strategy. The NO[sub x] emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO[sub x] control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

Kenkeremath, L.D.; Snyder, T.C.

1993-01-01T23:59:59.000Z

436

Title I implementation: Status report on nonattainment areas  

SciTech Connect

Key provisions of Title I of the Clean Air Act Amendments of 1990 (CAAA) focus on bringing cities and other areas into attainment of the National Ambient Air Quality Standards for ozone, carbon monoxide (CO), and fine particulates (PM-10). The CAAA`s new classification scheme for pollutant nonattainment areas is based on the relative severity of pollution in these areas and determines the stringency of control measures and the dates by which attainment of the standards will be required. The US Environmental Protection Agency`s (EPA`s) final rule on air quality designations and classifications, published in late 1991, shows that ozone pollution remains a persistent problem; the number of counties that fail to meet the ozone standard has sharply increased since 1987. In contrast, incidence of PM-10 pollution has decreased; many counties have achieved the PM-10 standard since 1987. Nationwide, the number of CO nonattainment areas has increased, though not dramatically. Many of the new Title I requirements focus on the role of nitrogen oxides (NO{sub x}) in the formation of ground-level ozone. In ozone nonattainment areas and ozone transport regions, Title I generally requires major sources of NO{sub x} to have the same control measures as those that apply to major sources of volatile organic compounds (VOCs). This requirement compels state regulators to adopt an integrated VOC/NO{sub x} control strategy. The NO{sub x} emission standards proposed by state regulators are considerably more stringent than those given in federal guidelines. Both the EPA and the states plan to allow the use of multifacility emissions averaging in state NO{sub x} control strategies, thereby providing industry flexibility. Proposed federal Economic Incentive Program (EIP) rules would also allow sources in states with approved EIPs to use mobile source emission reduction credits to meet certain stationary source emission reduction requirements.

Kenkeremath, L.D.; Snyder, T.C.

1993-01-01T23:59:59.000Z

437

Process for making surfactant capped nanocrystals  

DOE Patents (OSTI)

Disclosed is a process for making surfactant capped nanocrystals of transition metal oxides. The process comprises reacting a metal cupferron complex of the formula M Cup, wherein M is a transition metal, and Cup is a cupferron, with a coordinating surfactant, the reaction being conducted at a temperature ranging from about 250 to about 300 C., for a period of time sufficient to complete the reaction.

Alivisatos, A Paul (Berkeley, CA); Rockenberger, Joerg (Berkeley, CA)

2002-01-01T23:59:59.000Z

438

Equal Employment Opportunity -Title VII | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Equal Employment Opportunity -Title VII Equal Employment Opportunity -Title VII Diversity and Inclusion Supporting Small Businesses Minority Economic Impact Partnering with...

439

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-C 4-C NEPA ID No.: PXP-10-0008 Demolition of Building 12-2B Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Building 12-2B and reduce the Pantex Plant footprint by 3,181 square feet. Project tasks include preparing and approving Planning Documents, removing building furnishings and contents, cutting, capping, and rerouting utilities associated with the structure, razing the structure, reworking/closing masonry wall at door opening, recycling uncontaminated concrete and metal, disposing of waste, and backfilling and restoring the area

440

SOAJ Search : Main View : Search Results for Title: "Genetic parameters for  

Office of Scientific and Technical Information (OSTI)

Search: Title: "Genetic parameters for five traits in Africanized Search: Title: "Genetic parameters for five traits in Africanized honeybees using Bayesian inference" Did you mean ? Create new alert from this search New Search My Selections (0) Alerts Source Status Activity Indicator 0 top results from at least 0 found. of sources complete 0 more results found.Add results Topics Visual Generating Clusters... Searching No clusters were found All Results Deep Web Technologies Logo Wikipedia Searching... Searching EurekAlert! Searching... Searching - of Sort By: Rank Date Title Author Limit to: First Page Previous Page Next Page Last Page Refine Search Enter term(s) to search for within your current results list Cancel Refine Search No results were found. Please edit your search criteria and try again. Refer to Help pages from

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Dating deception: Gender, online dating, and exaggerated self-presentation  

Science Conference Proceedings (OSTI)

This study examined how differences in expectations about meeting impacted the degree of deceptive self-presentation individuals displayed within the context of dating. Participants filled out personality measures in one of four anticipated meeting conditions: ... Keywords: Gender differences, Internet, Mate selection, Personality, Self-presentation

Rosanna E. Guadagno; Bradley M. Okdie; Sara A. Kruse

2012-03-01T23:59:59.000Z

442

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

443

Texas Administrative Code TITLE 19 EDUCATION  

E-Print Network (OSTI)

Rules Texas Administrative Code TITLE 19 EDUCATION PART 1 TEXAS HIGHER EDUCATION COORDINATING BOARD IN TEXAS SUBCHAPTER C APPROVAL OF NEW ACADEMIC PROGRAMS AND ADMINISTRATIVE CHANGES AT PUBLIC UNIVERSITIES of Approval for New Doctoral Degree Programs Page 1 of 1: Texas Administrative Code 7/18/2011http://info.sos

Wood, James B.

444

Date Date Date Date Date  

E-Print Network (OSTI)

This thesis investigates the problem of regulating the temperature of a conditioned space using a Solar Assisted Air Conditioning Systems (SAACS) prototype located at Cabo Rojo, Puerto Rico. The SAACS Prototype consists of a 66 flat plate solar collector array with 115.4 m 2 of selective surface area, a 35 kW single-effect lithium-bromide absorption chiller, a 84 kW cooling tower, a 50 kW auxiliary hot water boiler, a 5700 liter storage tank equipped with flexible stratification manifolds, and a 1800 l/hr air-handling unit. A discrete-time state-space model of the absorption chiller and a linear model of the plant to be controlled (the conditioned space) are identified and presented. Experimental data was used for the determination of these models. A temperature controller was designed and applied to the plant model. This controller operates the absorption chiller under multiple load conditions and regulates the flow in the chilled water line based on the conditioned space requirements. The designed controller was implemented in the SAACS prototype. The systems

Carlos A. Gonzlez Lozano; Miguel Vlez Reyes, Ph.D.; Gerson Beauchamp Bez, Ph.D., Ph.D.

2004-01-01T23:59:59.000Z

445

TITLE XIIISMART GRID SEC. 1305. SMART GRID ...  

Science Conference Proceedings (OSTI)

Page 1. TITLE XIIISMART GRID SEC. 1305. SMART GRID INTEROPERABILITY FRAMEWORK. (a) INTEROPERABILITY ...

2013-05-16T23:59:59.000Z

446

Title, Location, Document Number Estimated Cost Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5/9/2011 5/9/2011 Transmittal to State: 2/3/2012 EA Approval: 5/1/2012 FONSI: 5/1/2012 Determination Date: 4/15/2010 Transmittal to State: N/A EA Approval: N/A FONSI: N/A EA Determination Date: 9/1/2009 Transmittal to State: 12/10/2010 EA Approval: FONSI: EA Determination Date: 5/15/2010 Transmittal to State: EA Approval: FONSI: Determination Date: 7/28/2009 Transmittal to State: EA Approval: FONSI: EA Determination Date: 12/20/2010 Transmittal to State: EA Approval: FONSI: Determination Date: 12/17/2010 Transmittal to State: N/A EA Approval: N/A FONSI: N/A EA Determination Date: Transmittal to State: EA Approval: FONSI: NewPage Proposed Wood Biomass-to-Liquid Fule Biorefinery, Wisconsin Rapids, Wisconsin (DOE/EA-1811) 100,000 This EA is on hold. Cloud County Community College: Wind Energy Project, Kansas (DOE/EA-1852)

447

Effective Date: MEMORANDUM OF UNDERSTANDING  

E-Print Network (OSTI)

complementary goals in aviation and future space transportation, to coordinate planning efforts, and to haveEffective Date: MEMORANDUM OF UNDERSTANDING Between DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION IN AVIATION AND SPACE TRANSPORTATION I. PURPOSE The Department of TransportatiodFederal Aviation

448

UNDERGRADUATE HANDBOOK 2011 Final Dates  

E-Print Network (OSTI)

............................................................................................................... Friday 23 September Last day for receipt of applications to enrol for 2012 through UAC without financial to be confirmed. Semester & session dates for 2012 First Semester Information Systems Head of School and Professor of Accounting FARGHER, Professor Neil L., BCom Melb MBus RMIT

449

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2011 30, 2011 CX-006224: Categorical Exclusion Determination Non Resource Recovery and Conservation Act Permit Related, General Site Actions, and Non-Routine Actions at the Pinellas County, Florida Site LM 14 - 11 CX(s) Applied: B1.3 Date: 06/30/2011 Location(s): Pinellas County, Florida Office(s): Legacy Management June 30, 2011 CX-006116: Categorical Exclusion Determination Kentucky On Farm Energy Efficiency and Renewable Energy Partnership Market Title -- 98 Kilowatt Photovoltaic Electricity Generation CX(s) Applied: B5.1 Date: 06/30/2011 Location(s): Fancy Farm, Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 30, 2011 CX-006115: Categorical Exclusion Determination Minnesota 85% Ethanol Fueling Network Expansion Project

450

Incorporating Wind Generation in Cap and Trade Programs  

DOE Green Energy (OSTI)

Cap and trade programs are increasingly being used to reduce emissions from electricity generation in the United States. Cap and trade programs primarily target emitting generators, but programs have also included renewable generators, such as wind generators. States cite several reasons why they have considered the policy option of including renewable generators in cap and trade programs: to provide an incentive for lower-emitting generation, to achieve emissions reductions in non-capped pollutants, and to gain local economic benefits associated with renewable energy projects. The U.S. Environmental Protection Agency also notes these rationales for considering this policy alternative, and the National Association of Regulatory Commissioners (NARUC) passed a resolution supporting the inclusion of renewable energy in cap and trade programs. This report explores why states consider this policy option, what participation could mean for wind generators, and how wind generation can most effectively be included in state, federal, and regional cap and trade programs.

Bluestein, J.; Salerno, E.; Bird, L.; Vimmerstedt, L.

2006-07-01T23:59:59.000Z

451

Update and Overview of the U.S. Department of Energy's Rulemakings for ASHRAE 90.1 Equipment Presentation, dated June 26, 2011  

Energy.gov (U.S. Department of Energy (DOE))

This document is the U.S. Department of Energys presentation titled Update and Overview of the U.S. Department of Energy's Rulemakings for ASHRAE 90.1 Equipment?, date 6/26/2011.

452

Title, Location, Document Number Estimated Cost Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1/23/2013 1/23/2013 Transmittal to State: TBD EA Approval: TBD FONSI: TBD EA Determination Date: Transmittal to State: EA Approval: FONSI: EA Determination Date: Transmittal to State: EA Approval: FONSI: EA Determination Date: Transmittal to State: EA Approval: FONSI: EA Determination Date: Transmittal to State: EA Approval: FONSI: Total Estimated Cost $0 Office of Legacy Management Jan-13 Annual NEPA Planning Summary Evaluation of Proposed Grazing on the Maybell and Maybell West UMTRCA sites, Colorado TBD DOE is seeking reuse of the lands associated with the Maybell and Maybell West UMTRCA disposal sites in Moffat County, in northwestern Colorado. Potential impacts from grazing would be evaluated in this EA. The schedule and costs have yet to be determined since EA determination was recently made.

453

Preform spar cap for a wind turbine rotor blade  

DOE Patents (OSTI)

A spar cap for a wind turbine rotor blade. The spar cap may include multiple preform components. The multiple preform components may be planar sheets having a swept shape with a first end and a second end. The multiple preform components may be joined by mating the first end of a first preform component to the second end of a next preform component, forming the spar cap.

Livingston, Jamie T. (Simpsonville, SC); Driver, Howard D. (Greer, SC); van Breugel, Sjef (Enschede, NL); Jenkins, Thomas B. (Cantonment, FL); Bakhuis, Jan Willem (Nijverdal, NL); Billen, Andrew J. (Daarlerveen, NL); Riahi, Amir (Pensacola, FL)

2011-07-12T23:59:59.000Z

454

MFTF-. cap alpha. + T progress report  

SciTech Connect

Early in FY 1983, several upgrades of the Mirror Fusion Test Facility (MFTF-B) at Lawrence Livermore National Laboratory (LLNL) were proposed to the fusion community. The one most favorably received was designated MFTF-..cap alpha..+T. The engineering design of this device, guided by LLNL, has been a principal activity of the Fusion Engineering Design Center during FY 1983. This interim progress report represents a snapshot of the device design, which was begun in FY 1983 and will continue for several years. The report is organized as a complete design description. Because it is an interim report, some parts are incomplete; they will be supplied as the design study proceeds. As described in this report, MFTF-..cap alpha..+T uses existing facilities, many MFTF-B components, and a number of innovations to improve on the physics parameters of MFTF-B. It burns deuterium-tritium and has a central-cell Q of 2, a wall loading GAMMA/sub n/ of 2 MW/m/sup 2/ (with a central-cell insert module), and an availability of 10%. The machine is fully shielded, allows hands-on maintenance of components outside the vacuum vessel 24 h after shutdown, and has provisions for repair of all operating components.

Nelson, W.D. (ed.)

1985-04-01T23:59:59.000Z

455

Capital Access Program (CAP) (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CAP) (Michigan) CAP) (Michigan) Capital Access Program (CAP) (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Michigan Program Type Loan Program The Capital Access Program (CAP), utilizes public resources to generate private financing for small business in Michigan seeking access to capital.

456

Blacks and the family cap: pregnancy, abortion, and spillovers  

Science Conference Proceedings (OSTI)

Mar 29, 2006 ... reduction in nonmarital birth rates, particularly among black women. This .... rates are 21% lower among blacks impacted by the family cap.

457

Title Page Applied and Environmental Microbiology 1  

NLE Websites -- All DOE Office Websites (Extended Search)

Applied and Environmental Microbiology 1 Applied and Environmental Microbiology 1 2 Title Natural Competence in Thermoanaerobacter and Thermoanaerobacterium Species 3 Running Title Thermonanerobacter Natural Competence 4 5 Authors and Affiliations 6 A. Joe Shaw 1,2 , David A. Hogsett 1 , Lee R. Lynd 1,2,3 * 7 1 Mascoma Corporation, Lebanon, NH 03766 8 2 Thayer School of Engineering, Dartmouth College, Hanover, NH 03755 9 3 Department of Biological Sciences, Dartmouth College, Hanover, NH 03755 10 11 Corresponding Author 12 Lee R. Lynd 13 Thayer School of Engineering, Dartmouth College, Hanover, NH 03755 14 Phone: 603.646.2231 15 Email: lee.lynd@dartmouth.edu 16 17 18 19 20 21 22 23 Copyright © 2010, American Society for Microbiology and/or the Listed Authors/Institutions. All Rights Reserved.

458

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

459

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

460

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determinations By Date September 24, 2012 CX-009335: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 0924...

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By Date April 11, 2011 CX-005702: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Schmitz, Mary C. Date: 04112011 Location(s): Minnesota...

462

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

463

School of Electrical Engineering and Computer Science Grant Awards Project Title Agency PI-CoPI(s) Start Date End Date $$ Funded  

E-Print Network (OSTI)

: Energy Developments, Addressing the Need of the Energy Industry,n Abu Dhabi, UAE NSF Batarseh 01/01/11 12 NSF Gong 08/01/09 07/31/14 $400,000 Wireless Passive Ceramic MEMS Sensors for High Temperature Wireless Passive Ceramic Sensors US Dept. of Energy Gong Xu An 10/01/09 12/31/12 $784,193 Dependable

Foroosh, Hassan

464

School of Electrical Engineering and Computer Science Grant Awards Project Title Agency PI-CoPI(s) Start Date End Date $$ Funded  

E-Print Network (OSTI)

: Energy Developments, Addressing the Need of the Energy Industry,n Abu Dhabi, UAE NSF Batarseh 01/01/11 12 08/01/09 07/31/14 $400,000 Wireless Passive Ceramic MEMS Sensors for High Temperature Applications Passive Ceramic Sensors US Dept. of Energy Gong Xu An 10/01/09 06/30/11 $415,000 IRES: U

Foroosh, Hassan

465

2014 NEJC Save the Date (Spanish)  

Energy.gov (U.S. Department of Energy (DOE))

2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014

466

Property:CapRockLithology | Open Energy Information  

Open Energy Info (EERE)

CapRockLithology CapRockLithology Jump to: navigation, search Property Name CapRockLithology Property Type String Description Condensed description of the lithology of the cap rock. Subproperties This property has the following 6 subproperties: B Beowawe Hot Springs Geothermal Area Brady Hot Springs Geothermal Area D Desert Peak Geothermal Area E East Mesa Geothermal Area H Heber Geothermal Area S Salton Sea Geothermal Area Pages using the property "CapRockLithology" Showing 6 pages using this property. A Amedee Geothermal Area + volcanic; lacustrine sediments + B Blue Mountain Geothermal Area + Hydrothermal alteration layer + G Geysers Geothermal Area + Hydrothermal alteration layer + K Kilauea East Rift Geothermal Area + Overlapping a'a' and pahoehoe flows + L Long Valley Caldera Geothermal Area + Metasedimentary Landslide Block; Hydrothermal Alteration Layer +

467

Learning About the Equal Employment Opportunity - Title VII - Complaint  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Learning About the Equal Employment Opportunity - Title VII - Learning About the Equal Employment Opportunity - Title VII - Complaint Process Learning About the Equal Employment Opportunity - Title VII - Complaint Process Learn about what is unlawful under Title VII, the legislation behind it, the steps before filing a complaint (mediation), how an individual files an official Title VII complaint, the acceptance or dismissal process, the investigation process, and the resolution process. Your Coverage Under Equal Employment Opportunity - Title VII A discriminatory action is unlawful under Title VII if: The discriminating party is an employer, employment agency or labor organization defined by Title VII; The basis for the alleged discrimination is race, color, religion, sex, national origin, or retaliation. This issue or claim involves a discriminatory matter or personnel

468

Cap-and-Trade Modeling and Analysis: Congested Electricity Market Equilibrium  

E-Print Network (OSTI)

Concerning Cap and Trade Programs in Electricity: the CaseCap and Trade Regulation on Congested Electricity Marketcap and trade regu- lation on congested electricity market

Limpaitoon, Tanachai

2012-01-01T23:59:59.000Z

469

Testing, Modeling, and Monitoring to Enable Simpler, Cheaper, Longer-Lived Surface Caps  

Science Conference Proceedings (OSTI)

Society has and will continue to generate hazardous wastes whose risks must be managed. For exceptionally toxic, long-lived, and feared waste, the solution is deep burial, e.g., deep geological disposal at Yucca Mtn. For some waste, recycle or destruction/treatment is possible. The alternative for other wastes is storage at or near the ground level (in someones back yard); most of these storage sites include a surface barrier (cap) to prevent downward water migration. Some of the hazards will persist indefinitely. As society and regulators have demanded additional proof that caps are robust against more threats and for longer time periods, the caps have become increasingly complex and expensive. As in other industries, increased complexity will eventually increase the difficulty in estimating performance, in monitoring system/component performance, and in repairing or upgrading barriers as risks are managed. An approach leading to simpler, less expensive, longer-lived, more manageable caps is needed. Our project, which started in April 2002, aims to catalyze a Barrier Improvement Cycle (iterative learning and application) and thus enable Remediation System Performance Management (doing the right maintenance neither too early nor too late). The knowledge gained and the capabilities built will help verify the adequacy of past remedial decisions, improve barrier management, and enable improved solutions for future decisions. We believe it will be possible to develop simpler, longer-lived, less expensive caps that are easier to monitor, manage, and repair. The project is planned to: a) improve the knowledge of degradation mechanisms in times shorter than service life; b) improve modeling of barrier degradation dynamics; c) develop sensor systems to identify early degradation; and d) provide a better basis for developing and testing of new barrier systems. This project combines selected exploratory studies (benchtop and field scale), coupled effects accelerated aging testing at the intermediate meso-scale, testing of new monitoring concepts, and modeling of dynamic systems. The emphasis on meso-scale (coupled) tests, accelerated effects testing, and dynamic modeling differentiates the project from other efforts, while simultaneously building on that body of knowledge. The performance of evapotranspiration, capillary, and grout-based barriers is being examined. To date, the project can report new approaches to the problem, building new experimental and modeling capabilities, and a few preliminary results.

Piet, Steven James; Breckenridge, Robert Paul; Burns, Douglas Edward

2003-02-01T23:59:59.000Z

470

Testing, Modeling, and Monitoring to Enable Simpler, Cheaper, Longer-lived Surface Caps  

SciTech Connect

Society has and will continue to generate hazardous wastes whose risks must be managed. For exceptionally toxic, long-lived, and feared waste, the solution is deep burial, e.g., deep geological disposal at Yucca Mtn. For some waste, recycle or destruction/treatment is possible. The alternative for other wastes is storage at or near the ground level (in someone's back yard); most of these storage sites include a surface barrier (cap) to prevent downward water migration. Some of the hazards will persist indefinitely. As society and regulators have demanded additional proof that caps are robust against more threats and for longer time periods, the caps have become increasingly complex and expensive. As in other industries, increased complexity will eventually increase the difficulty in estimating performance, in monitoring system/component performance, and in repairing or upgrading barriers as risks are managed. An approach leading to simpler, less expensive, longer-lived, more manageable caps is needed. Our project, which started in April 2002, aims to catalyze a Barrier Improvement Cycle (iterative learning and application) and thus enable Remediation System Performance Management (doing the right maintenance neither too early nor too late). The knowledge gained and the capabilities built will help verify the adequacy of past remedial decisions, improve barrier management, and enable improved solutions for future decisions. We believe it will be possible to develop simpler, longer-lived, less expensive caps that are easier to monitor, manage, and repair. The project is planned to: (a) improve the knowledge of degradation mechanisms in times shorter than service life; (b) improve modeling of barrier degradation dynamics; (c) develop sensor systems to identify early degradation; and (d) provide a better basis for developing and testing of new barrier systems. This project combines selected exploratory studies (benchtop and field scale), coupled effects accelerated aging testing at the intermediate meso-scale, testing of new monitoring concepts, and modeling of dynamic systems. The emphasis on meso-scale (coupled) tests, accelerated effects testing, and dynamic modeling differentiates the project from other efforts, while simultaneously building on that body of knowledge. The performance of evapotranspiration, capillary, and grout-based barriers is being examined. To date, the project can report new approaches to the problem, building new experimental and modeling capabilities, and a few preliminary results.

Piet, S. J.; Breckenridge, R. P.; Burns, D. E.

2003-02-25T23:59:59.000Z

471

TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI-  

Gasoline and Diesel Fuel Update (EIA)

6 STAT. 2962 6 STAT. 2962 PUBLIC LAW 107-347-DEC. 17 2002 TITLE V-CONFIDENTIAL INFORMATION PROTECTION AND STATISTICAL EFFI- CIENCY SEC. 501. SHORT TITLE. This title may be cited as the ''Confidential Information Protec- tion and Statistical Efficiency Act of 2002''. SEC. 502. DEFINITIONS. As used in this title: (1) The term ''agency'' means any entity that falls within the definition of the term ''executive agency'' as defined in section 102 of title 31, United States Code, or ''agency'', as defined in section 3502 of title 44, United States Code. (2) The term ''agent'' means an individual- (A)(i) who is an employee of a private organization or a researcher affiliated with an institution of higher learning (including a person granted special sworn status by the Bureau of the Census under section 23(c) of title

472

Grant And Contract AWARD Report -Investigator Detail Name (PI/Copi) Title Sponsor (Prime Sponsor) Budget Start End Dates  

E-Print Network (OSTI)

interests include plasma waste gasification, plasma torches, spectroscopy, plasma medicine, and holographic2512 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 36, NO. 5, OCTOBER 2008 Experimental Investigation-power microwave breakdown based on measured laser breakdown observations. Comparison of 193-nm laser

Papautsky, Ian

473

TANK DEIS SUMMARY TITLE PG.psd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Summary S-iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site High-Level Waste Tank Closure Environmental Impact Statement (DOE/EIS-0303), Aiken, South Carolina. CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 730B, Room 2418 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov For general information on DOE's National Environmental Policy Act (NEPA) process, write or call: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

474

Microsoft Word - Title X Reimbursements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy U.S. Department of Energy Office of Inspector General Office of Audit Operations Audit Report Management Controls Over Title X Claims Reimbursement at the West Chicago Thorium Processing Facility OAS-M-04-08 September 2004 previously approved by the Department from the 1994 through 2001 claims. This occurred because the Department had not developed an assurance strategy that included both adequate technical and financial reviews of the Kerr-McGee claims. As a result, the Department could pay Kerr-McGee up to $164 million more for clean-up without adequate assurance that only reimbursable costs will be paid. During the audit, the Department initiated corrective actions by requiring that DCAA issue an opinion on the adequacy of the 2002 claimed costs and by removing the $4 million in disallowed

475

TANK DEIS TITLE PG.psd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cover Sheet Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site High-Level Waste Tank Closure Environmental Impact Statement (DOE/EIS-0303), Aiken, South Carolina CONTACT: For additional information on this environmental impact statement (EIS), write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office Building 730B, Room 2418 Aiken, South Carolina 29802 Attention: Tank Closure EIS Local and Nationwide Telephone: (800) 881-7292 Email: nepa@srs.gov For general information on DOE's National Environmental Policy Act (NEPA), write or call: Ms. Carol M. Borgstrom, Director Office of NEPA Policy and Compliance, EH-42 U.S. Department of Energy 1000 Independence Avenue, S.W.

476

EOTA - Business Form Document Title: Nonconformance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 3 5 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 3 EOTA - Business Form Document Title: Nonconformance Report Document Number: F-015 Rev. 07_12-06 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-011, Nonconforming Material / Product Process Notify of Changes: EOTA Employees Referenced Document(s): N/A F-015 Nonconformance Report 07_1206.doc 07_1206 Page 2 of 3 Revision History: Rev. Description of Change A Initial Release 07_1206 Converted form F-015 to a Word Form. Changed layout of form. No content changes were done. C D E F-015 Nonconformance Report 07_1206.doc 07_1206 Page 1 of 1 Nonconformance Report (NCR) General Information NCR # -

477

Building Energy Software Tools Directory: EnergyCAP Professional  

NLE Websites -- All DOE Office Websites (Extended Search)

Professional Professional EnergyCAP Professional logo. Online software for domestic public school districts (see EnergyCAP Enterprise and Express for other organizations) that need straightforward utility bill tracking, energy management reports and calculation of the cost avoidance attributable to energy management activities. A typical Professional client has 50–1,000 utility accounts and pays $500,000 to $10 million per year. Professional Online is primarily used from one energy management or utilities management office. It uses Microsoft's SQL Server database. Multiple users can access the data simultaneously. EnergyCAP Professional Online is perfect for school districts that need: Verification of utility bills. EnergyCAP's exclusive Bill Auditor checks each bill more than 50 ways for reasonableness.

478

Stakeholder Engagement and Outreach: Incorporating Wind in Cap and Trade  

Wind Powering America (EERE)

Incorporating Wind in Cap and Trade Programs Incorporating Wind in Cap and Trade Programs There are various methods of allocating allowances to renewable energy sources under cap and trade programs, such as renewable energy set asides and output-based approaches. Background materials and presentations from the January 12, 2006 Webcast below, provide information on why it is important to include wind and other renewables in cap and trade programs and how best to incorporate them. Implications of Carbon Regulation for Green Power Markets Bird, L.; Holt, E.; Carroll, G. National Renewable Energy Laboratory, April 2007. January 12, 2006 Webcast: Incorporating Renewable Energy under the Clean Air Interstate Rule (CAIR) Co-Sponsors American Wind Energy Association (AWEA) U.S. DOE/NREL Wind Powering America

479

Property:Incentive/AggrCapLimit | Open Energy Information  

Open Energy Info (EERE)

AggrCapLimit AggrCapLimit Jump to: navigation, search Property Name Incentive/AggrCapLimit Property Type Text Description Aggregate Capacity Limit. Pages using the property "Incentive/AggrCapLimit" Showing 25 pages using this property. (previous 25) (next 25) A APS - Net Metering (Arizona) + 15 MW American Samoa - Net Metering (American Samoa) + 5% of utility's peak demand Ames Electric Department - Net Metering (Iowa) + Carried month to month at retail rate, granted to utility after 12 months Ashland Electric - Net Metering (Oregon) + No limit specified Aspen Electric - Net Metering (Colorado) + Credited to customer's next bill Austin Energy - Net Metering (Texas) + No limit specified (program will be re-evaluated after 1% of load is met) Avista Utilities - Net Metering (Idaho) + 0.1% of utility's peak demand in 1996 (in Idaho)

480

Assessment of U.S. cap-and-trade proposals  

E-Print Network (OSTI)

The MIT Emissions Prediction and Policy Analysis model is applied to an assessment of a set of cap-and-trade proposals being considered by the U.S. Congress in spring 2007. The bills specify emissions reductions to be ...

Paltsev, Sergey V.

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "title date cap" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Assessment of U.S. Cap-and-Trade Proposals  

E-Print Network (OSTI)

The MIT Emissions Prediction and Policy Analysis model is applied to an assessment of a set of cap-and-trade proposals being considered by the U.S. Congress in spring 2007. The bills specify emissions reductions to be ...

Paltsev, Sergey

482

Wind blade spar cap and method of making  

DOE Patents (OSTI)

A wind blade spar cap for strengthening a wind blade including an integral, unitary three-dimensional woven material having a first end and a second end, corresponding to a root end of the blade and a tip end of the blade, wherein the material tapers in width from the first to the second end while maintaining a constant thickness and decreasing weight therebetween, the cap being capable of being affixed to the blade for providing increased strength with controlled variation in weight from the root end to the tip end based upon the tapered width of the material thereof. The present inventions also include the method of making the wind blade spar cap and a wind blade including the wind blade spar cap.

Mohamed, Mansour H. (Raleigh, NC)

2008-05-27T23:59:59.000Z

483

Cap-and-Trade Properties under Different Scheme Designs  

E-Print Network (OSTI)

This paper examines the key design mechanisms of existing and proposed cap-and-trade markets. First, it is shown that the hybrid systems under investigation (safety-valve with offsets, price floor using a subsidy, price ...

Taschini, Luca

484

CinCap V LLC | Open Energy Information  

Open Energy Info (EERE)

search Name CinCap V LLC Place Indiana Utility Id 3539 Utility Location Yes Ownership W NERC Location RFC NERC RFC Yes ISO NE Yes Activity Wholesale Marketing Yes References...

485

Resource Adequacy Requirement: Reserve Margin, Contract Cover, and Price Caps  

Science Conference Proceedings (OSTI)

In setting RARs, some state agencies are proposing reserve margins greater than the pre-restructuring levels. But it would be a mistake to reach this conclusion unless other factors are explicitly considered. A simulation indicates that decisions on the reserve margin, the percentage of forward contract cover, and the level of price caps should not be made in isolation. The results support the conjecture that the higher the contract coverage, the less justifiable are high reserve margins or low price caps.

Rochlin, Cliff; Huang, Jeff

2005-09-01T23:59:59.000Z

486

H/sub. cap alpha. / studies on TFTR  

DOE Green Energy (OSTI)

H/sub ..cap alpha../ emission is a useful indicator of hydrogen ionization since the energy required to excite hydrogen to the n = 3 level is approximately the same as to ionize the hydrogen atom. Other aspects of recycling, such as plasma scrape-off parameters, wall particle fluxes, and wall retention rates can be inferred from spatial distributions of H/sub ..cap alpha../ emission. There are two H/sub ..cap alpha../ diagnostics on TFTF observing the inner limiter: a relatively calibrated wide-angle TV camera, and the absolutely calibrated HAIFA diagnostic, both viewing the inner limiter. H/sub ..cap alpha../ observations by these instruments have been analyzed using the DEGAS neutral transport code. The core recycling rate, and ion and neutral particle limiter fluxes, have been deduced from the calculations. The results are very sensitive to the ion flux distribution, and therefore also provide information on the plasma scrape-off conditions. A survey was made of over 500 TFTR discharges. H/sub ..cap alpha../ emission appears to increase in proportion to /bar n//sub e//sup 2/. The ratio of core ionization to average H/sub ..cap alpha../ emission was calculated to be roughly constant over a large range of discharges. 9 refs., 4 figs., 1 tab.

Heifetz, D.B.; Ehrhardt, A.B.; Ramsey, A.T.; Dylla, H.F.; Budny, R.; McNeill, D.; Medley, S.; Ulrickson, M.

1988-08-01T23:59:59.000Z

487

Proceedings: In Situ Contaminated Sediment Capping Workshop: Cincinnati, Ohio, May 12-14, 2003  

Science Conference Proceedings (OSTI)

The In Situ Contaminated Sediment Capping Workshop was designed to provide the most current information and bring about consensus in understanding of a technology that offers one of the few options for remediation of contaminated sediments. These electronic proceedings document workshop sessions on various capping issues, such as site assessment; cap suitability, performance, and design; site monitoring; and research and development in capping.

2004-03-29T23:59:59.000Z

488

DOE receives title to Great Plains plant  

Science Conference Proceedings (OSTI)

On June 30, 1986 the Great Plains Coal Gasification Project was sold at a foreclosure sale at the Mercer County courthouse in North Dakota. The US Department of Energy was the only bidder at the sale. DOE's bid for the plant was $1 billion DOE-secured loan that the five sponsor companies defaulted on when they withdrew from the project in August 1985. DOE did not receive title to the plant until a lawsuit filed by American Natural Resources (ANR) was settled on July 14, 1986. DOE has vowed to keep the plant running as long as it does not cost the taxpayers any money. Eventually DOE wishes to dispose of the plant. Therefore, in February 1986 DOE requested that interested organizations submit expressions of interest in the Great Plains plant. This paper, after discussing the lawsuit, summarizes the nine responses received by DOE. Some companies were willing for it to remain a coal gasification facility; other submitted plans for modifications to produce methanol.

Not Available

1986-09-01T23:59:59.000Z

489

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

NLE Websites -- All DOE Office Websites (Extended Search)

Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm...

490

title Brookhaven National Laboratory Inside RHIC News Features...  

NLE Websites -- All DOE Office Websites (Extended Search)

Inside RHIC News Features title description Brookhaven National Laboratory conducts research in the physical biomedical and environmental sciences as well as in energy technologies...

491

Response to Request for Information titled "Addressing Policy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

energy and climate policy reduces the likelihood of a significant reduction in greenhouse gas emissions or energy imports. Response to Request for Information titled "Addressing...

492

title Thermal Energy Storage for Electricity Peakdemand Mitigation  

NLE Websites -- All DOE Office Websites (Extended Search)

proceedings title Thermal Energy Storage for Electricity Peakdemand Mitigation A Solution in Developing and Developed World Alike journal ECEEE Summer Study textendash June...

493

title Microgrid Reliability Modeling and Battery Scheduling Using...  

NLE Websites -- All DOE Office Websites (Extended Search)

article title Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming journal Journal of Electric Power Systems Research volume year month pages...

494

RECIPIENT:Dehlsen Associates STATE: CA PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATE: CA PROJECT TITLE: Marine & Hydrokinetic Energy System Development of the Aquantis 2.5MW Ocean-Current Electricity Generation Device Funding Opportunity Announcement...

495

SOAJ Search : Main View : Search Results for Title: "Genetic...  

Office of Scientific and Technical Information (OSTI)

Search: Title: "Genetic parameters for five traits in Africanized honeybees using Bayesian inference" Did you mean ? Create new alert from this search New Search My Selections (0)...

496

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE...  

NLE Websites -- All DOE Office Websites (Extended Search)

Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement...

497

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...

498

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 CX-001501: Categorical Exclusion Determination Commercial Renewable Energy Systems - FLS Meadowood Garden Solar CX(s) Applied: B5.1 Date: 04012010 Location(s):...

499

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Non-Contaminating Cryogenic Fracturing Technology CX(s) Applied: B3.6 Date: 12202011 Location(s): Colorado Offices(s):...

500

High Precision Radiometric Dating of Sedimentary Materials  

SciTech Connect

To develop field, petrographic and geochemical criteria to allow high precision U-Pb dating of sedimentary minerals within rapidly deposited sequences of carbonate and clastic rocks.

Hanson, G. N.

2006-09-19T23:59:59.000Z