National Library of Energy BETA

Sample records for time airports operate

  1. Review of EU airport energy interests and priorities with respect to ICT, energy efficiency and enhanced building operation 

    E-Print Network [OSTI]

    Costa, A.; Blanes, L. M.; Donnelly, C.; Keane, M. M.

    2012-01-01

    This paper gives an overview on EU airport energy interests and priorities with respect to ICT, energy efficiency and enhanced building operation. To achieve this objective the paper begins with an overview on airports role on energy consumption...

  2. Airports and Bicycles: what are the obstacles and incentives for operators 1 to improve bicycle access?

    E-Print Network [OSTI]

    Orrick, Phyllis; Frick, Karen Trapenberg

    2013-01-01

    Bicycle Route to Seattle-Tacoma International Airport andRoute Options to Seattle-Tacoma International Airport.International Airport, Seattle-Tacoma International Airport,

  3. The impact of airline-airport relations on airport management decisions

    E-Print Network [OSTI]

    Cohen, Dayl Arlene

    1985-01-01

    Airlines, in the past, have had an important influence on airport operations through privileges granted them by the airport lease agreements. Airport administrators and sponsoring agencies have agreed to grant these ...

  4. Problem Statement: Airports need to achieve carbon neutral growth operating an enterprise

    E-Print Network [OSTI]

    for Rental Cars and Commercial Vehicles Convert Rental Cars from Gas to Hybrid 50% Rental Fleet to Hybrid 0. Alternatively Fueled Airport Access Taxis (e.g. Hybrids or Electric vehicles) Inhibiting Factors to Carbon annually) 0.63 17,400 Alternatively Fueled Taxis Convert Taxi Fleet to Hybrid [Control through MWAA

  5. Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes

    E-Print Network [OSTI]

    and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

  6. Tackling uncertainty in airport design : a real options approach

    E-Print Network [OSTI]

    Chambers, Richard-Duane

    2007-01-01

    The airport industry is changing. Once understood as stand-alone public infrastructures, many modern airports now operate within privatized multi-airport systems and contend with previously unknown competitive pressures. ...

  7. Mitigating Runoff Contamination Due to DeIcing and Anti-Icing Operations at T.F.Green Airport

    E-Print Network [OSTI]

    Rhode Island, University of

    for the management of the wastewater that is generated. This responsibility is typically outlined in the airport's discharge permit. In Rhode Island, T.F. Green is the primary of six state airports supervised by the Rhode a solution or solutions to RIAC for TF Green Airport by investigating and analyzing different treatments

  8. Analysis of aircraft surface motion at Boston Logan International Airport

    E-Print Network [OSTI]

    Alhanatis, Robert Elias

    The purpose of this thesis is to examine the nature of aircraft surface motion on the airport surface during normal operations. Twelve hours of radar data, gathered by MIT Lincoln Laboratories from Logan airport in Boston, ...

  9. Implementing Solar Technologies at Airports

    SciTech Connect (OSTI)

    Kandt, A.; Romero, R.

    2014-07-01

    Federal agencies, such as the Department of Defense and Department of Homeland Security, as well as numerous private entities are actively pursuing the installation of solar technologies to help reduce fossil fuel energy use and associated emissions, meet sustainability goals, and create more robust or reliable operations. One potential approach identified for siting solar technologies is the installation of solar energy technologies at airports and airfields, which present a significant opportunity for hosting solar technologies due to large amounts of open land. This report focuses largely on the Federal Aviation Administration's (FAA's) policies toward siting solar technologies at airports.

  10. Siting Solar Photovoltaics at Airports: Preprint

    SciTech Connect (OSTI)

    Kandt, A.; Romero, R.

    2014-06-01

    Airports present a significant opportunity for hosting solar technologies due to their open land; based on a 2010 Federal Aviation Administration study, the US Department of Agriculture, and the US Fish and Wildlife Service, there's potential for 116,704 MW of solar photovoltaics (PV) on idle lands at US airports. PV has a low profile and likely low to no impact on flight operations. This paper outlines guidance for implementing solar technologies at airports and airfields, focusing largely on the Federal Aviation Administration's policies. The paper also details best practices for siting solar at airports, provides information on the Solar Glare Hazard Analysis Tool, and highlights a case study example where solar has been installed at an airport.

  11. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    for grid topology changes (implying online  security and Security Constrained Economic Dispatch (SCED) procedures.   Built upon GRID-grid, reliability, real?time operator tools, time synchronized phasor  measurements, voltage security.  

  12. Unaffordable fare : the cost of public transportation for low-income commuters working at three airports

    E-Print Network [OSTI]

    Nadeau, Carey Anne

    2015-01-01

    For airport employers, making sure the many low-income people they employ as baggage handlers and retail salespeople, amongst others, can get to work ensures the continued efficient operations of the airport and the ...

  13. A Decision Support Tool for the Pushback Rate Control of Airport Departures

    E-Print Network [OSTI]

    Sandberg, Melanie J.

    Airport surface congestion control has the potential to mitigate the increase in taxi times and fuel burn at major airports. One possible class of congestion control strategies predicts the departure throughput, and ...

  14. PRELIMINARY TIME ESTIMATES FOR CORING OPERATIONS

    E-Print Network [OSTI]

    PRELIMINARY TIME ESTIMATES FOR CORING OPERATIONS Ocean Drilling Program Texas A&M University portion requires the written consent of the Director, Ocean Drilling Program, Texas A&M University, College Station, Texas 77843-3469, as well as appropriate acknowledgment of this source. Technical Note 1

  15. REAL TIME SYSTEM OPERATIONS 2006-2007

    SciTech Connect (OSTI)

    Eto, Joseph H.; Parashar, Manu; Lewis, Nancy Jo

    2008-08-15

    The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

  16. Airline Passengers' Satisfaction with Airports 

    E-Print Network [OSTI]

    Kim, Hyun Joo

    2012-02-14

    Airports are places where people have the potential to experience either satisfaction or frustration, and marketing and tourism scholars have argued that customer satisfaction is one of the primary goals of airports. However, few studies have...

  17. Congestion delays at hub airports

    E-Print Network [OSTI]

    St. George, Martin J.

    1986-01-01

    A deterministic model was developed to study the effects of inefficient scheduling on flight delays at hub airports. The model bases the delay calculation on published schedule data and on user-defined airport capacities. ...

  18. Hydrogen Production and Dispensing Facility Opens at W. Va. Airport

    Broader source: Energy.gov [DOE]

    A hydrogen production and dispensing station constructed and operated with support from the Office of Fossil Energy's National Energy Technology Laboratory was officially opened Monday at the Yeager Airport in Charleston, W.Va.

  19. Manufacturing time operators: Covariance, selection criteria, and examples

    SciTech Connect (OSTI)

    Hegerfeldt, G. C. [Institut fuer Theoretische Physik, Universitaet Goettingen, Friedrich-Hund-Platz 1, DE-37077 Goettingen (Germany); Muga, J. G.; Munoz, J. [Departamento de Quimica Fisica, Universidad del Pais Vasco, Apartado 644, ES-48080 Bilbao (Spain)

    2010-07-15

    We provide the most general forms of covariant and normalized time operators and their probability densities, with applications to quantum clocks, the time of arrival, and Lyapunov quantum operators. Examples are discussed of the profusion of possible operators and their physical meaning. Criteria to define unique, optimal operators for specific cases are given.

  20. Manufacturing time operators: covariance, selection criteria, and examples

    E-Print Network [OSTI]

    G. C. Hegerfeldt; J. G. Muga; J. Muñoz

    2010-05-27

    We provide the most general forms of covariant and normalized time operators and their probability densities, with applications to quantum clocks, the time of arrival, and Lyapunov quantum operators. Examples are discussed of the profusion of possible operators and their physical meaning. Criteria to define unique, optimal operators for specific cases are given.

  1. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    Security Constrained  Unit Commitment (SCUC) and Security Security Constrained Unit Commitment (SCUC) and Securityin CA ISO’s Unit Commitment Operating Procedures) - Load

  2. A Real Time Operating System Survey What the heck is a Real Time system

    E-Print Network [OSTI]

    Groppi, Christopher

    A Real Time Operating System Survey John Ford 1 #12; What the heck is a Real Time system anyway.'' From POSIX 1003.1: ``Realtime in operating systems: the ability of the operating system to pro­ vide­Time Operating System) has to have a real­time kernel ffl Good documentation ffl Good device support ffl Good

  3. Philadelphia International Airport Apron Lighting: LED System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Philadelphia International Airport Apron Lighting: LED System Performance in a Trial Installation Philadelphia International Airport Apron Lighting: LED System Performance in a...

  4. A major cogeneration system goes in at JFK International Airport. Low-visibility privatization in a high-impact environment

    SciTech Connect (OSTI)

    Leibler, J.; Luxton, R.; Ostberg, P.

    1998-04-01

    This article describes the first major privatization effort to be completed at John F. Kennedy International Airport. The airport owner and operator, the Port Authority of New York and New Jersey, decided to seek private sector involvement in a capital-intensive project to expand and upgrade the airport`s heating and air conditioning facilities and construct a new cogeneration plant. Kennedy International Airport Cogeneration (KIAC) Partners, a partnership between Gas Energy Incorporated of New York and Community Energy Alternatives of New Jersey, was selected to develop an energy center to supply electricity and hot and chilled water to meet the airport`s growing energy demand. Construction of a 110 MW cogeneration plant, 7,000 tons of chilled water equipment, and 30,000 feet of hot water delivery piping started immediately. JFK Airport`s critical international position called for this substantial project to be developed almost invisibly; no interruption in heating and air conditioning service and no interference in the airport`s active operations could be tolerated. Commercial operation was achieved in February 1995.

  5. Simple time-variant filtering by operator scaling

    E-Print Network [OSTI]

    Park, Choon Byong; Black, Ross A.

    1995-09-01

    A convolutional method of time?variant, band?pass filtering presented shows that a change of filter cutoff frequencies with time is achieved by frequency scaling the amplitude spectrum of a reference operator. According to the scaling property...

  6. Emergence of secondary airports and dynamics of regional airport systems in the United States

    E-Print Network [OSTI]

    Bonnefoy, Philippe A

    2005-01-01

    With the growing demand for air transportation and limited capacity at major airports, there is a need to increase the capacity of airport systems at the metropolitan area level. The increased use of secondary airports has ...

  7. Denver International Airport Photovoltaic System

    Broader source: Energy.gov [DOE]

    The Denver International Airport (DIA) features a 2-megawatt (MW) photovoltaic (PV) system. DIA also hosts to a second 1.6-MW system. Denver is a Solar America City.

  8. Airport Express Tsuen Wan Line

    E-Print Network [OSTI]

    Edward Rd East Lai King Mei Foo Nam Cheong Prince Edward Mongkok Yau Ma Tei Tsim Sha Tsui East International Airport Tsing Yi Ngau Tau Kok Clear Water Bay Road Chek Lap Kok Lung Cheung Rd Prince

  9. Crucial tests of the existence of a Time Operator

    E-Print Network [OSTI]

    Thomas Durt

    2010-03-14

    In the present paper we show that the Temporal Wave Function approach of the decay process, which is a multicomponent version of the Time Operator approach leads to new, non-standard, predictions concerning the statistical properties of decay time distributions of single kaons and entangled pairs of mesons. These results suggest crucial experimental tests for the existence of a Time Operator for the decay process to be realized in High Energy Physics or Quantum Optics.

  10. Estimating Traveler Populations at Airport and Cruise Terminals for Population Distribution and Dynamics

    SciTech Connect (OSTI)

    Jochem, Warren C; Sims, Kelly M; Bright, Eddie A; Urban, Marie L; Rose, Amy N; Coleman, Phil R; Bhaduri, Budhendra L

    2013-01-01

    In recent years, uses of high-resolution population distribution databases are increasing steadily for environmental, socioeconomic, public health, and disaster-related research and operations. With the development of daytime population distribution, temporal resolution of such databases has been improved. However, the lack of incorporation of transitional population, namely business and leisure travelers, leaves a significant population unaccounted for within the critical infrastructure networks, such as at transportation hubs. This paper presents two general methodologies for estimating passenger populations in airport and cruise port terminals at a high temporal resolution which can be incorporated into existing population distribution models. The methodologies are geographically scalable and are based on, and demonstrate how, two different transportation hubs with disparate temporal population dynamics can be modeled utilizing publicly available databases including novel data sources of flight activity from the Internet which are updated in near-real time. The airport population estimation model shows great potential for rapid implementation for a large collection of airports on a national scale, and the results suggest reasonable accuracy in the estimated passenger traffic. By incorporating population dynamics at high temporal resolutions into population distribution models, we hope to improve the estimates of populations exposed to or at risk to disasters, thereby improving emergency planning and response, and leading to more informed policy decisions.

  11. Assignment 3 Objective: Signal processing through simple time domain operations.

    E-Print Network [OSTI]

    Naik, Naren

    Assignment 3 Objective: Signal processing through simple time domain operations. Part 1 : Q1. Play millisecond and alpha = 0.2 . Compare your output with signal generated by an audio processing software. Audacity Software: It is a open source software to do basic signal processing operations over audio

  12. Airport surface traffic optimization and simulation in the presence of uncertainties

    E-Print Network [OSTI]

    Lee, Hanbong

    2014-01-01

    Surface traffic congestion causes significant taxi delays and long queues for takeoffs at busy airports, increasing operational and environmental costs. These impacts may be mitigated by optimizing runway and taxiway ...

  13. DOE to Build Hydrogen Fuel Test Facility at West Virginia Airport

    Broader source: Energy.gov [DOE]

    The Office of Fossil Energy's National Energy Technology Laboratory today announced plans to construct and operate a hydrogen fuel production plant and vehicle fueling station at the Yeager Airport in Charleston, W.Va.

  14. Real-Time Plasma Control Tools for Advanced Tokamak Operation

    SciTech Connect (OSTI)

    Varandas, C. A. F.; Sousa, J.; Rodrigues, A. P.; Carvalho, B. B.; Fernandes, H.; Batista, A. J.; Cruz, N.; Combo, A.; Pereira, R. C. [Centro de FuSao Nuclear, Associacao Euratom/IST, Instituto Superior Tecnico, Av. Rovisco Pais, P-1049-001 Lisbon (Portugal)

    2006-12-04

    Real-time control will play an important role in the operation and scientific exploitation of the new generation fusion devices. This paper summarizes the real-time systems and diagnostics developed by the Portuguese Fusion Euratom Association based on digital signal processors and field programmable gate arrays.

  15. ST. LOUIS AIRPORT/ HAZELWOOD INTERIM

    E-Print Network [OSTI]

    processed at the downtown site from 1942 to 1957 under contracts to the Manhattan Engineering District (MED) and later the Atomic Energy Commission (AEC). The transfer of process residues from downtown to sites nearST. LOUIS AIRPORT/ HAZELWOOD INTERIM STORAGE/FUTURA COATINGS CO. MISSOURI EPA ID# MOD980633176 SITE

  16. Real time detection and correction of distribution feeder operational problems

    SciTech Connect (OSTI)

    Subramanian, A.K.; Huang, J.C.

    1995-12-31

    The paper presents a new technique that detects and corrects distribution operational problems using closed loop control of substation transformers, capacitors and reactors by an online computer. This allows the distribution system to be operated close to its capacity without sacrificing the quality of power supply. Such operations help defer the additional cost of installing new substations. The technique integrates the Distribution Feeder Analysis (DFA) and the Distribution Substation Control (DSC) functions to achieve this. The DFA function provides the topology and power flow results for the feeders using the substation real time measurements. It does not require feeder section measurements. The realtime feeder results are used in detecting any currently existing feeder operational problems such as feeder section voltages and currents outside their limits. The detected feeder problems are transformed into substation distribution bus objectives and then corrected by the DSC function using controls available at the substation. The DSC function has been performing successfully for several years at Potomac Electric Power Company (PEPCO) in Washington, D.C. It uses a closed loop control scheme that controls the substation transformer taps and shunt capacitor and reactor breakers and optimizes the substation operation. By combining the DFA and DSC functions into a single function and with proper transformation of feeder problems into substation objectives, a new closed loop control scheme for the substation controls is achieved. This scheme corrects the detected feeder problems and optimizes the substation operation. This technique is implemented and tested using the actual substation and feeder models of PEPCO.

  17. Real-time Pricing Demand Response in Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Marinovici, Maria C.; Berliner, Teri; Graves, Alan

    2012-07-26

    Abstract—Dynamic pricing schemes have been implemented in commercial and industrial application settings, and recently they are getting attention for application to residential customers. Time-of-use and critical-peak-pricing rates are in place in various regions and are being piloted in many more. These programs are proving themselves useful for balancing energy during peak periods; however, real-time (5 minute) pricing signals combined with automation in end-use systems have the potential to deliver even more benefits to operators and consumers. Besides system peak shaving, a real-time pricing system can contribute demand response based on the locational marginal price of electricity, reduce load in response to a generator outage, and respond to local distribution system capacity limiting situations. The US Department of Energy (DOE) is teaming with a mid-west electricity service provider to run a distribution feeder-based retail electricity market that negotiates with residential automation equipment and clears every 5 minutes, thus providing a signal for lowering or raising electric consumption based on operational objectives of economic efficiency and reliability. This paper outlines the capability of the real-time pricing system and the operational scenarios being tested as the system is rolled-out starting in the first half of 2012.

  18. Semi-groups and time operators for quantum unstable systems

    E-Print Network [OSTI]

    Maurice Courbage

    2004-10-11

    We use spectral projections of time operator in the Liouville space for simple quantum scattering systems in order to define a space of unstable particle states evolving under a contractive semi-group. This space includes purely exponentially decaying states that correspond to complex eigenvalues of this semi-group. The construction provides a probabilistic interpretation of the resonant states characterized in terms of the Hardy class.

  19. Improving public transportation to Boston Logan International Airport

    E-Print Network [OSTI]

    Cao, Siyuan, M. Eng. Massachusetts Institute of Technology

    2013-01-01

    Boston Logan International Airport is the largest airport in New England and the 1 9 th busiest airport in the United States, serving 29.3 million passengers (arrivals and departures) in 2012. There are approximately 36,900 ...

  20. VIRTUAL TIME BASED DYNAMIC LOAD MANAGEMENT IN THE TIME WARP OPERATING SYSTEM

    E-Print Network [OSTI]

    California at Los Angeles, University of

    VIRTUAL TIME BASED DYNAMIC LOAD MANAGEMENT IN THE TIME WARP OPERATING SYSTEM Peter L. Reiher Jet on parallel machines. Recently TWOS has been substantially improved by the addition of dynamic load management to processors. Because TWOS uses optimistic synchronization, existing load management theory, which tends

  1. A publication of the Airport Technical Assistance Program of the Center for Transportation Studies at the University of Minnesota Winter 2014 Vol. 14, No. 1 For more on the Fall Forum, including video highlights, see www.AirTAP.umn.edu.

    E-Print Network [OSTI]

    Amin, S. Massoud

    at the University of Minnesota Winter 2014 Vol. 14, No. 1 Briefings For more on the Fall Forum, including video department. That full-time staff is augmented with 28 heavy equipment operators in the winter who work got a look at how the airport handles the snow and ice that's part of a typical Minnesota winter

  2. Invariance in quantum walks with time-dependent coin operators

    E-Print Network [OSTI]

    Miquel Montero

    2014-10-02

    In this paper we unveil some features of a discrete-time quantum walk on the line whose coin depends on the temporal variable. After considering the most general form of the unitary coin operator, we focus on the role played by the two phase factors that one can incorporate there, and show how both terms influence the evolution of the system. A closer analysis reveals that the probabilistic properties of the motion of the walker remain unaltered when the update rule of these phases is chosen adequately. This invariance is based on a symmetry with consequences not yet fully explored.

  3. A comparison of aircraft trajectory-based and aggregate queue-based control of airport taxi processes

    E-Print Network [OSTI]

    Lee, Hanbong

    There is significant potential to decrease fuel burn, emissions, and delays of aircraft at airports by optimizing surface operations. A simple surface traffic optimization approach is to hold aircraft back at the gates ...

  4. Integrating repositories with fuel cycles: The airport authority model

    SciTech Connect (OSTI)

    Forsberg, C. [Massachusetts Inst. of Technology, 77 Massachusetts Avenue, Cambridge, MA 02139-4307 (United States)

    2012-07-01

    The organization of the fuel cycle is a legacy of World War II and the cold war. Fuel cycle facilities were developed and deployed without consideration of the waste management implications. This led to the fuel cycle model of a geological repository site with a single owner, a single function (disposal), and no other facilities on site. Recent studies indicate large economic, safety, repository performance, nonproliferation, and institutional incentives to collocate and integrate all back-end facilities. Site functions could include geological disposal of spent nuclear fuel (SNF) with the option for future retrievability, disposal of other wastes, reprocessing with fuel fabrication, radioisotope production, other facilities that generate significant radioactive wastes, SNF inspection (navy and commercial), and related services such as SNF safeguards equipment testing and training. This implies a site with multiple facilities with different owners sharing some facilities and using common facilities - the repository and SNF receiving. This requires a different repository site institutional structure. We propose development of repository site authorities modeled after airport authorities. Airport authorities manage airports with government-owned runways, collocated or shared public and private airline terminals, commercial and federal military facilities, aircraft maintenance bases, and related operations - all enabled and benefiting the high-value runway asset and access to it via taxi ways. With a repository site authority the high value asset is the repository. The SNF and HLW receiving and storage facilities (equivalent to the airport terminal) serve the repository, any future reprocessing plants, and others with needs for access to SNF and other wastes. Non-public special-built roadways and on-site rail lines (equivalent to taxi ways) connect facilities. Airport authorities are typically chartered by state governments and managed by commissions with members appointed by the state governor, county governments, and city governments. This structure (1) enables state and local governments to work together to maximize job and tax benefits to local communities and the state, (2) provides a mechanism to address local concerns such as airport noise, and (3) creates an institutional structure with large incentives to maximize the value of the common asset, the runway. A repository site authority would have a similar structure and be the local interface to any national waste management authority. (authors)

  5. Comprehensive Energy Management and CC® at DFW Airport 

    E-Print Network [OSTI]

    Kramer, L.

    2011-01-01

    Rent-A-Car Center 130,000 2004, 2010 Administration Building 81,000 2007 Terminal D 2,000,000 2008-2009 Energy Plaza (CUP) 41,000 tons of capacity 2008-2009 Terminal E 460,000 2010 North Business Center 52,000 2010 Energy Plaza (HVAC) 125,000 2010... International Airport Continuous Commissioning? International Conference for Enhanced Building Operations New York Marriott at the Brooklyn Bridge New York, NY Larry Kramer, P.E., LC, CEM October 20, 2011 Continuous Commissioning? of DFW International...

  6. Concept of Operations for Real-time Airborne Management System

    SciTech Connect (OSTI)

    Barr, Jonathan L.; Taira, Randal Y.; Orr, Heather M.

    2013-03-04

    The purpose of this document is to describe the operating concepts, capabilities, and benefits of RAMS including descriptions of how the system implementations can improve emergency response, damage assessment, task prioritization, and situation awareness. This CONOPS provides general information on operational processes and procedures required to utilize RAMS, and expected performance benefits of the system. The primary audiences for this document are the end users of RAMS (including flight operators and incident commanders) and the RAMS management team. Other audiences include interested offices within the Department of Homeland Security (DHS), and officials from other state and local jurisdictions who want to implement similar systems.

  7. Cost Benefit Analysis Modeling Tool for Electric vs. ICE Airport Ground Support Equipment – Development and Results

    SciTech Connect (OSTI)

    James Francfort; Kevin Morrow; Dimitri Hochard

    2007-02-01

    This report documents efforts to develop a computer tool for modeling the economic payback for comparative airport ground support equipment (GSE) that are propelled by either electric motors or gasoline and diesel engines. The types of GSE modeled are pushback tractors, baggage tractors, and belt loaders. The GSE modeling tool includes an emissions module that estimates the amount of tailpipe emissions saved by replacing internal combustion engine GSE with electric GSE. This report contains modeling assumptions, methodology, a user’s manual, and modeling results. The model was developed based on the operations of two airlines at four United States airports.

  8. Modeling Airline Frequency Competition for Airport Congestion Mitigation

    E-Print Network [OSTI]

    Vaze, Vikrant

    Demand often exceeds capacity at congested airports. Airline frequency competition is partially responsible for the growing demand for airport resources. We propose a game-theoretic model for airline frequency competition ...

  9. Value of Options in Airport Expansion - Example of AICM

    E-Print Network [OSTI]

    Morgado, Frederico

    Investments decisions for airport capacity expansion are usually taken, either when demand exceeds the current capacity and the airport is working under congestion, or when current demand is expected to overcome current ...

  10. Of airports and architecture : exercises in public form

    E-Print Network [OSTI]

    Fouad, Daniel James

    2006-01-01

    Airports as an architectural and urban typology typically lack physical and spatial integration with their urban context. Contrary to the city, airports have evolved into semi-autonomous spaces and products of political ...

  11. Airport quotas and peak hour pricing : theory and practice

    E-Print Network [OSTI]

    Odoni, Amedeo R.

    1976-01-01

    This report examines the leading theoretical studies not only of airport peak-hour pricing but also of the congestion costs associated with airport delays and presents a consistent formulation of both. The report also ...

  12. Moriarty Municipal Airport (0E0) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 tel .................................................................................................................Skid Resistance 13 ....................................................3. Airport Maintenance Completed Assuming No Maintenance 14 ...............Table 5. Predicted Pavement Conditions (PCI) Assuming

  13. Las Cruces International Airport (LRU) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    , AICP Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 ........................................................................................................3. Airport Maintenance 14 .......................................4. Predicted Pavement Conditions Assuming No Maintenance 14 ...............Table 4. Predicted Pavement Conditions (PCI) Assuming

  14. Guidelines to improve airport preparedness against chemical and biological terrorism.

    SciTech Connect (OSTI)

    Edwards, Donna M.; Price, Phillip N. (Lawrence Berkeley National Laboratory, Berkeley, CA); Gordon, Susanna P.; Gadgil, Ashok (Lawrence Berkeley National Laboratory, Berkeley, CA)

    2005-05-01

    Guidelines to Improve Airport Preparedness Against Chemical and Biological Terrorism is a 100-page document that makes concrete recommendations on improving security and assessing vulnerable areas and helps its readers understand the nature of chemical and biological attacks. The report has been turned over to Airports Council International (ACI) and the American Association of Airport Executives (AAAE), two organizations that together represent the interests of thousands of airport personnel and facilities in the U.S. and around the world.

  15. Operational Analysis of Timed Petri Nets and Application to the Computation of Performance Bounds

    E-Print Network [OSTI]

    Chiola, Giovanni

    networks were al­ ready proven to hold in stochastic Petri net models. In this paper we derive, under muchOperational Analysis of Timed Petri Nets and Application to the Computation of Performance Bounds G the behaviour of timed Petri nets un­ der very weak assumptions on their timing semantics. New operational

  16. Performance, measurement and evaluation of time-shared operating systems 

    E-Print Network [OSTI]

    Adams, John Colin

    1977-01-01

    Time-shared, virtual memory systems are very complex and changes in their performance may be caused by many factors - by variations in the workload as well as changes in system configuration. The evaluation of these ...

  17. Time operator for the quantum harmonic oscillator: resolution of an apparent paradox

    E-Print Network [OSTI]

    Alex Granik; H. Ralph Lewis

    2000-06-14

    An apparent paradox is resolved that concerns the existence of time operators which have been derived for the quantum harmonic oscillator. There is an apparent paradox because, although a time operator is canonically conjugate to the Hamiltonian, it has been asserted that no operator exists that is canonically conjugate to the Hamiltonian. In order to resolve the apparent paradox, we work in a representation where the phase operator is diagonal. The boundary condition on wave functions is such that they be periodic in the phase variable, which is related to the (continuous) eigenvalue of the time operator. Matrix elements of the commutator of the time operator with the Hamiltonian involve the phase variable itself in addition to periodic functions of the phase variable. The Hamiltonian is not hermitian when operating in space that includes the phase variable itself. The apparent paradox is resolved when this non-hermeticity is taken into account correctly in the evaluation of matrix elements of the commutation relation.

  18. Noise Load Management at Amsterdam Airport Schiphol

    E-Print Network [OSTI]

    Boucherie, Richard J.

    Noise Load Management at Amsterdam Airport Schiphol T.R. Meerburg , R.J. Boucherie , M.J.A.L. van objective is to guarantee safety, efficiency, and protection of the environment, that includes noise load contributes to the noise load at these points. If the cumulative load in an aviation year at an enforce- ment

  19. Airport ATC Communications: Procedures and Phraseology

    E-Print Network [OSTI]

    -four cleared for takeoff · Beech eight-delta-mike, after departure, turn left, and proceed direct to the Boiler runway 24 · ... takeoff from runway 10, turn left after takeoff, and fly direct to the BOILER VOR (pick, cleared to Chicago O'Hare Airport, via direct Boiler, victor-seven Chicago Heights, direct 6. King Air

  20. Los Alamos Shows Airport Security Technology at Work

    ScienceCinema (OSTI)

    Espy, Michelle; Schultz, Larry; Hunter, James

    2014-06-24

    Los Alamos scientists have advanced a Magnetic Resonance Imaging (MRI) technology that may provide a breakthrough for screening liquids at airport security. They've added low-power X-ray data to the mix, and as a result have unlocked a new detection technology. Funded in part by the Department of Homeland Security's Science and Technology Directorate, the new system is named MagRay. The goal is to quickly and accurately distinguish between liquids that visually appear identical. For example, what appears to be a bottle of white wine could potentially be nitromethane, a liquid that could be used to make an explosive. Both are clear liquids, one would be perfectly safe on a commercial aircraft, the other would be strictly prohibited. How to tell them apart quickly without error at an airport security area is the focus of Michelle Espy, Larry Schultz and their team. In this video, Espy and the MagRay team explain how the new technology works, how they've developed an easy operator interface, and what the next steps might be in transitioning this technology to the private sector.

  1. PREDICTION OF FOG EPISODES AT THE AIRPORT OF MADRID-BARAJAS USING DIFFERENT MODELING APPROACHES

    E-Print Network [OSTI]

    Politècnica de Catalunya, Universitat

    PREDICTION OF FOG EPISODES AT THE AIRPORT OF MADRID-BARAJAS USING DIFFERENT MODELING APPROACHES Meteorología (INM) has been investigating for some time the phenomena related to the formation of fog episodes between the development of fog and the establishment of katabatic flows in the region, generally under

  2. The estimation of fuel cell operating time for predictive maintenance R. Onanena a,b,c

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 The estimation of fuel cell operating time for predictive maintenance strategies R. Onanena a of the limiting factors for the spreading of the fuel cell technology is the durability and researches to extend fuel cell operating time based on electrochemical impedance spectroscopy measurements. It consists

  3. Evolution and Development of Multi-Airport Systems: A Worldwide Perspective

    E-Print Network [OSTI]

    . This dynamic was driven by the entry of low-cost carriers seizing the opportunity of using existing airport, multi-airport systems have generally evolved through the construction of new high capacity airports, due

  4. EECBG Success Story: New San Antonio Airport Terminal Generating...

    Office of Environmental Management (EM)

    away and the team knew that a solar photovoltaic (PV) system at the airport would offer a highly visible location to showcase renewable energy technologies, help the city...

  5. Nonlinearity and noise modeling of operational transconductance amplifiers for continuous time analog filters 

    E-Print Network [OSTI]

    Ramachandran, Arun

    2006-08-16

    A general framework for performance optimization of continuous-time OTA-C (Operational Transconductance Amplifier-Capacitor) filters is proposed. Efficient procedures for evaluating nonlinear distortion and noise valid for ...

  6. Supervisory Feed-Forward Control for Real-Time Topping Cycle CHP Operation

    SciTech Connect (OSTI)

    Cho, Heejin; Luck, Rogelio; Chamra, Louay M.

    2010-03-01

    This paper presents an energy dispatch algorithm for real-time topping cycle Cooling, Heating, and Power (CHP) operation for buildings with the objective of minimizing the operational cost, primary energy consumption (PEC), or carbon dioxide emission (CDE). The algorithm features a supervisory feed-forward control for real-time CHP operation using short-term weather forecasting. The advantages of the proposed control scheme for CHP operation are (a) relatively simple and efficient implementation allowing realistic real-time operation , (b) optimized CHP operation with respect to operational cost, PEC, or CDE, and (c) increased site-energy consumption (SEC) resulting in less dependence on the electric grid. In the feed-forward portion of the control scheme, short-term electric, cooling, and heating loads are predicted using the U.S. Department of Energy (DOE) benchmark small office building model. The results are encouraging regarding the potential saving of operational cost, PEC, and CDE from using the control system for a CHP system with electric and thermal energy storages.

  7. An Approach of Modeling, Monitoring and Managing Business Operations for Just-In-Time Manufacturing

    E-Print Network [OSTI]

    Li, Haifei

    An Approach of Modeling, Monitoring and Managing Business Operations for Just-In-Time Manufacturing execution and monitoring for the JIT (Just In Time) schedule execution. JIT is a manufacturing method to change their manufacturing orders. When a manufacturer receives an order change request, the manufacturer

  8. A comparison of time study standards and methods-time measurement standards for three foundry operations 

    E-Print Network [OSTI]

    Bruckart, Richard F

    1952-01-01

    1 lETKO98~PIk~~ iARASIJQHMMT SgAHQAR98 FOB-TSRZi:" FOUNDiVi' OP='HkTXO%8 7 A MIG8 X8 by A~st, 1&3/2 A CCPaPkRXSOV "GF TXZ" STUDY STAg9AB3S '$739 @STSGQS T~S J~SgQ~gFS T STSSggggg. TGB TAKE FGiiPi, &QRY GPSSATXGNS The@, is... ' o a, a' e'i. '. ' '. 17 IV-':, -. '. "' ':-:;. ; 'A. Compsriaon'ofe Time'8 'StjjdT". and M?- T":M Hte4ndards, in' Cgre@iovJin'g OPsratihng ' ~ ' e . . 26 V"': -' " 4 Oompax isoh of Time' gtudy and--M Ta Ra Htsndards in Grinding'OPeratienae . a 'e...

  9. Vertical Protection Levels for a Local Airport Monitor for WAAS

    E-Print Network [OSTI]

    Stanford University

    they provide acceptable availability, even for a VAL of 10 m. INTRODUCTION The Local Airport Monitor (LAMVertical Protection Levels for a Local Airport Monitor for WAAS Jason Rife, Sam Pullen, Todd Walter development costs for the Local Area Augmentation System (LAAS) have motivated the investigation

  10. FAA Airport Categories Website | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbH JumpEllenville,PowerEvaporative CoolersExosunOpenExtremelyFAA Airport

  11. Building Airport Systems for the Next Generation Dealing with the uncertainties of airport development will require new strategies.

    E-Print Network [OSTI]

    Building Airport Systems for the Next Generation Dealing with the uncertainties of airport and passenger buildings, and most travelers know from experience the frequency of aircraft delays, missed skilled and smart people doing their best to make things better, why aren't we getting reasonable results

  12. Decentralized aircraft landing scheduling at single runway non-controlled airports 

    E-Print Network [OSTI]

    Ding, Yuanyuan

    2009-05-15

    to enhance the transportation capabilities of the small airports in the U.S.A., and distribute the high volume of air traffic at the hub airports to those small airports, which are mostly non-controlled airports. Currently, two major focus areas of research...

  13. Physical limits of semiconductor laser operation: A time-resolved analysis of catastrophic optical damage

    SciTech Connect (OSTI)

    Ziegler, Mathias; Hempel, Martin; Tomm, Jens W.; Elsaesser, Thomas [Max-Born-Institut fuer Nichtlineare Optik und Kurzzeitspektroskopie, Max-Born-Str. 2A, 12489 Berlin (Germany); Larsen, Henning E.; Andersen, Peter E. [Department of Photonics Engineering, Technical University of Denmark, DK4000 Roskilde (Denmark); Clausen, Soennik [Risoe DTU, Technical University of Denmark, DK4000 Roskilde (Denmark); Elliott, Stella N. [Cardiff School of Physics and Astronomy, Cardiff University, The Parade, Cardiff CF24 3AA (United Kingdom)

    2010-07-12

    The early stages of catastrophic optical damage (COD) in 808 nm emitting diode lasers are mapped by simultaneously monitoring the optical emission with a 1 ns time resolution and deriving the device temperature from thermal images. COD occurs in highly localized damage regions on a 30 to 400 ns time scale which is determined by the accumulation of excess energy absorbed from the optical output. We identify regimes in which COD is avoided by the proper choice of operation parameters.

  14. Alternative Fuels Data Center: Dallas Airport Operates With Alternative

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L O O D S TA I NLoans TheCountyCitiesDriving FutureFuels

  15. A comparative study of continuous-time modelings for scheduling of crude oil operations

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    A comparative study of continuous-time modelings for scheduling of crude oil operations Xuan Chena and formulations for the crude oil scheduling problem. We compare the event-based model, the unit slot model on its efficient performance for industrial problems. Keywords: Crude oil scheduling; event-based model

  16. NUMERICAL SOLUTION OF RESERVOIR FLOW MODELS BASED ON LARGE TIME STEP OPERATOR SPLITTING ALGORITHMS

    E-Print Network [OSTI]

    NUMERICAL SOLUTION OF RESERVOIR FLOW MODELS BASED ON LARGE TIME STEP OPERATOR SPLITTING ALGORITHMS. Special focus is posed on the numerical solution algorithms for the saturation equation, which. The general background for the reservoir ow model is reviewed, and the main features of the numerical

  17. NUMERICAL SOLUTION OF RESERVOIR FLOW MODELS BASED ON LARGE TIME STEP OPERATOR SPLITTING ALGORITHMS

    E-Print Network [OSTI]

    NUMERICAL SOLUTION OF RESERVOIR FLOW MODELS BASED ON LARGE TIME STEP OPERATOR SPLITTING ALGORITHMS focus is posed on the numerical solution algorithms for the saturation equation, which is a convection­ eral background for the reservoir flow model is reviewed, and the main features of the numerical

  18. A Real-Time Decision Support System for High Cost Oil-Well Drilling Operations

    E-Print Network [OSTI]

    Aamodt, Agnar

    A Real-Time Decision Support System for High Cost Oil-Well Drilling Operations Odd Erik Gundersen and development cost in addition to two case studies are documented. Introduction DrillEdge is a software system for how to handle the current situation. Verdande Technology has developed DrillEdge to reduce the cost

  19. Transmission line relay mis-operation detection based on time-synchronized field data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Esmaeilian, Ahad; Popovic, Tomo; Kezunovic, Mladen

    2015-05-04

    In this paper, a real-time tool to detect transmission line relay mis-operation is implemented. The tool uses time-synchronized measurements obtained from both ends of the line during disturbances. The proposed fault analysis tool comes into the picture only after the protective device has operated and tripped the line. The proposed methodology is able not only to detect, classify, and locate transmission line faults, but also to accurately confirm whether the line was tripped due to a mis-operation of protective relays. The analysis report includes either detailed description of the fault type and location or detection of relay mis-operation. As such,more »it can be a source of very useful information to support the system restoration. The focus of the paper is on the implementation requirements that allow practical application of the methodology, which is illustrated using the field data obtained the real power system. Testing and validation is done using the field data recorded by digital fault recorders and protective relays. The test data included several hundreds of event records corresponding to both relay mis-operations and actual faults. The discussion of results addresses various challenges encountered during the implementation and validation of the presented methodology.« less

  20. Transfer passenger needs at airports : human factors in terminal design

    E-Print Network [OSTI]

    Brillembourg, Marie-Claire

    1982-01-01

    This thesis analyzes the needs of particular users of airport: transfer passengers. The object of this work has been to produce a set of design guidelines for terminals. these guidelines are framed upon a user-need survey ...

  1. A survey of approaches to the airport slot allocation problem

    E-Print Network [OSTI]

    Cohen, Dayl Arlene

    1985-01-01

    Introduction: The allocation of slots at congested major commercial airports is one of the most difficult problems facing the aviation community today. The stakes involved are very large and the controversy generated by ...

  2. New MagViz Airport Liquid Analysis System Undergoes Testing

    ScienceCinema (OSTI)

    None

    2010-01-08

    LOS ALAMOS, New Mexico, December 16, 2008?An innovative application of a technology first used for medical imaging may enhance airport security if Los Alamos National Laboratory scientists are successful. Los Alamos technologists have adapted Magnetic Res

  3. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity...

    Office of Legacy Management (LM)

    been removed from most of the properties and placed in temporary storage at the Hazelwood Interim Storage Site, also known as the Latty Avenue site. The St. Louis Airport Vicinity...

  4. Belen Alexander Municipal Airport (E80) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    . Lucero, AICP Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM Assuming No Maintenance 13 ..........Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance ..............................................................6. Maintenance and Rehabilitation (M&R) Schedule 20

  5. Raton Municipal Airport (RTN) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 tel No Maintenance 14 ...............Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance After 2007 .......................................................6. Maintenance and Rehabilitation (M&R) Sche

  6. Clayton Municipal Airport (CAO) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 tel No Maintenance 13 .....................Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance 14 for Runway 12-30 (2010) 20 .......................................................6. Maintenance

  7. Silver City Grant County Airport (SVC) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    , AICP Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 No Maintenance 13 ...............Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance After 2010 .......................................................6. Maintenance and Rehabilitation (M&R) Schedule 21

  8. Deming Municipal Airport (DMN) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 tel No Maintenance 16 2 #12;...............Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance After

  9. Sierra Blanca Ruidoso Airport (SRR) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    , AICP Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 No Maintenance 13 .................................Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance 14 ..........................................Figure 7. Sierra Blanca Ruidoso (SRR) Predicted PCI

  10. Robust decision-support tools for airport surface traffic

    E-Print Network [OSTI]

    Carr, Francis R. (Francis Russell), 1976-

    2004-01-01

    Forecasts of departure demand are one of the driving inputs to tactical decision-support tools (DSTs) for airport surface traffic. While there are well-known results on average- or worst-case forecast uncertainty, it is ...

  11. Robust Decision-Support Tools for Airport Surface Traffic

    E-Print Network [OSTI]

    Carr, Francis R.

    Forecasts of departure demand are one of the driving inputs to tactical decision-support tools (DSTs) for airport surface traffic. While there are well-known results on average- or worst-case forecast uncertainty, it is ...

  12. Roswell International Air Center Airport (ROW) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    Roswell International Air Center Airport (ROW) Pavement Condition and Analysis Submitted to: Jane M ................................................1. Conditions at Roswell International Air Center (ROW) 4 .................................Figure 1. Geographic Location of Roswell International Air Center (ROW) 4 ..............................Table 1

  13. Mitigating airport congestion : market mechanisms and airline response models

    E-Print Network [OSTI]

    Harsha, Pavithra

    2009-01-01

    Efficient allocation of scarce resources in networks is an important problem worldwide. In this thesis, we focus on resource allocation problems in a network of congested airports. The increasing demand for access to the ...

  14. Realt-Time Building Occupancy Sensing for Supporting Demand Driven HVAC Operations 

    E-Print Network [OSTI]

    Ekwevugbe, T.; Brown, N.; Pakka, V.

    2013-01-01

    use. Previous research have proposed up to 56% HVAC related energy savings with improvements in operation and management of HVAC systems (Sun et al., 2011, Tachwali et al., 2007). Real- time building occupancy sensing is useful for efficient.... The area enjoys good natural lighting due to its large side windows, although it is shaded from the direct effect of the sun by an adjacent part of the building. It is ventilated with three glazed roof vents. The vents are controlled together by room...

  15. Commissioning, Operation, Real Time Monitoring and Evaluation of Pilot: Achieving Optimal Performance through Building Commissioning 

    E-Print Network [OSTI]

    Pang,X.; Piette, M.A.; Hao,B.

    2014-01-01

    CONSORTIUM U.S. - CHINA CLEAN ENERGY RESEARCH CENTER (CERC-BEE) E3: Commissioning, Operation, Real Time Monitoring and Evaluation of Pilot Achieving Optimal Performance through Building Commissioning Xiufeng Pang, Mary Ann Piette, Bin Hao Interface... to demo projects to ensure that the CERC-BEE demonstrated technologies work properly and are integrated with the rest of the building systems • Review the Cx plans for the two demo projects, the CABR building and the Xingye building. • Develop optimal...

  16. Airport: Fly into either (SJC) San Jose International Airport (12.2 miles from CHM) or (SFO) San

    E-Print Network [OSTI]

    Geller, Michael R.

    Airport: Fly into either (SJC) San Jose International Airport (12.2 miles from CHM) or (SFO) San.9 miles from CHM) hotel@gardencourt.com Rev: 2/12 San Jose Fairmont Hotel San Jose 170 S. Market Street San Jose, CA 95113 Tel: 408-998-1900 | Fax: 408-287-1648 | Toll free: 866-540-4493 (12.6 miles from

  17. Real-Time Combined Heat and Power Operational Strategy Using a Hierarchical Optimization Algorithm

    SciTech Connect (OSTI)

    Yun, Kyung Tae; Cho, Heejin; Luck, Rogelio; Mago, Pedro J.

    2011-06-01

    Existing attempts to optimize the operation of Combined Heat and Power (CHP) systems for building applications have two major limitations: the electrical and thermal loads are obtained from historical weather profiles; and the CHP system models ignore transient responses by using constant equipment efficiencies. This paper considers the transient response of a building combined with a hierarchical CHP optimal control algorithm to obtain a real-time integrated system that uses the most recent weather and electric load information. This is accomplished by running concurrent simulations of two transient building models. The first transient building model uses current as well as forecast input information to obtain short term predictions of the thermal and electric building loads. The predictions are then used by an optimization algorithm, i.e., a hierarchical controller, that decides the amount of fuel and of electrical energy to be allocated at the current time step. In a simulation, the actual physical building is not available and, hence, to simulate a real-time environment, a second, building model with similar but not identical input loads are used to represent the actual building. A state-variable feedback loop is completed at the beginning of each time step by copying, i.e., measuring, the state variable from the actual building and restarting the predictive model using these ?measured? values as initial conditions. The simulation environment presented in this paper features nonlinear effects such as the dependence of the heat exchanger effectiveness on their operating conditions. The results indicate that the CHP engine operation dictated by the proposed hierarchical controller with uncertain weather conditions have the potential to yield significant savings when compared to conventional systems using current values of electricity and fuel prices.

  18. Real time explosive hazard information sensing, processing, and communication for autonomous operation

    DOE Patents [OSTI]

    Versteeg, Roelof J.; Few, Douglas A.; Kinoshita, Robert A.; Johnson, Douglas; Linda, Ondrej

    2015-12-15

    Methods, computer readable media, and apparatuses provide robotic explosive hazard detection. A robot intelligence kernel (RIK) includes a dynamic autonomy structure with two or more autonomy levels between operator intervention and robot initiative A mine sensor and processing module (ESPM) operating separately from the RIK perceives environmental variables indicative of a mine using subsurface perceptors. The ESPM processes mine information to determine a likelihood of a presence of a mine. A robot can autonomously modify behavior responsive to an indication of a detected mine. The behavior is modified between detection of mines, detailed scanning and characterization of the mine, developing mine indication parameters, and resuming detection. Real time messages are passed between the RIK and the ESPM. A combination of ESPM bound messages and RIK bound messages cause the robot platform to switch between modes including a calibration mode, the mine detection mode, and the mine characterization mode.

  19. Operation redwing: Report to the scientific director. Timing and firing (sanitized version)

    SciTech Connect (OSTI)

    1996-10-29

    Task Unit 5 (YU-5) was organized to accomplish the following tasks during Operation Redwing (May - June 1956): (1) To supply timing signals and voice count-down to meet the principal requirements of the experimental programs; (2) To supply the arming and firing pulses to the devices tested; (3) To furnish personnel as members of the arming and firing parties; (4) To provide and maintain the Task Group 7.1 (TG 7.1) short-range commercial radio communications at Bikini and Eniwetok atolls; and (5) To perform such scientific measurements and photography as provided for under existing contractual agreements.

  20. Classical-like behavior in quantum walks with inhomogeneous, time-dependent coin operators

    E-Print Network [OSTI]

    Miquel Montero

    2015-05-29

    Although quantum walks exhibit distinctive properties that distinguish them from random walks, classical behavior can be recovered by destroying the coherence of the pure state associated to the quantum system. Here I show that this is not the only way: I introduce a quantum walk driven by an inhomogeneous, time-dependent coin operator, which mimics the statistical properties of a random walk. The quantum particle undergoes unitary evolution and, in fact, the coherence evidenced by the wave function can be used to revert the outcome of an accidental measure of its chirality.

  1. Estimation and tactical allocation of airport capacity in the presence of uncertainty

    E-Print Network [OSTI]

    Ramanujam, Varun

    2012-01-01

    Major airports in the United States and around the world have seen an increase in congestion-related delays over the past few years. Because airport congestion is caused by an imbalance between available capacity and demand, ...

  2. Evaluation of strategies for reducing taxi-out emissions at airports

    E-Print Network [OSTI]

    Deonandan, Indira

    Aircraft taxiing on the surface contribute significantly to the fuel burn and emissions at airports. This paper is aimed at estimating the baseline fuel burn and emissions from taxi-out processes at airports, evaluating ...

  3. High-Performance Computing for Real-Time Grid Analysis and Operation

    SciTech Connect (OSTI)

    Huang, Zhenyu; Chen, Yousu; Chavarría-Miranda, Daniel

    2013-10-31

    Power grids worldwide are undergoing an unprecedented transition as a result of grid evolution meeting information revolution. The grid evolution is largely driven by the desire for green energy. Emerging grid technologies such as renewable generation, smart loads, plug-in hybrid vehicles, and distributed generation provide opportunities to generate energy from green sources and to manage energy use for better system efficiency. With utility companies actively deploying these technologies, a high level of penetration of these new technologies is expected in the next 5-10 years, bringing in a level of intermittency, uncertainties, and complexity that the grid did not see nor design for. On the other hand, the information infrastructure in the power grid is being revolutionized with large-scale deployment of sensors and meters in both the transmission and distribution networks. The future grid will have two-way flows of both electrons and information. The challenge is how to take advantage of the information revolution: pull the large amount of data in, process it in real time, and put information out to manage grid evolution. Without addressing this challenge, the opportunities in grid evolution will remain unfulfilled. This transition poses grand challenges in grid modeling, simulation, and information presentation. The computational complexity of underlying power grid modeling and simulation will significantly increase in the next decade due to an increased model size and a decreased time window allowed to compute model solutions. High-performance computing is essential to enable this transition. The essential technical barrier is to vastly increase the computational speed so operation response time can be reduced from minutes to seconds and sub-seconds. The speed at which key functions such as state estimation and contingency analysis are conducted (typically every 3-5 minutes) needs to be dramatically increased so that the analysis of contingencies is both comprehensive and real time. An even bigger challenge is how to incorporate dynamic information into real-time grid operation. Today’s online grid operation is based on a static grid model and can only provide a static snapshot of current system operation status, while dynamic analysis is conducted offline because of low computational efficiency. The offline analysis uses a worst-case scenario to determine transmission limits, resulting in under-utilization of grid assets. This conservative approach does not necessarily lead to reliability. Many times, actual power grid scenarios are not studied, and they will push the grid over the edge and resulting in outages and blackouts. This chapter addresses the HPC needs in power grid analysis and operations. Example applications such as state estimation and contingency analysis are given to demonstrate the value of HPC in power grid applications. Future research directions are suggested for high performance computing applications in power grids to improve the transparency, efficiency, and reliability of power grids.

  4. Maximizing the Efficiency of LHC Maintenance during Operation Times using a Mobile Tool

    E-Print Network [OSTI]

    Martel, Pedro; Mallon Amerigo, Sonia; Pater, Lukasz; Petit, Stephan; Widegren, David

    2010-01-01

    The operation of the Large Hadron Collider (LHC) imposes minimum maintenance time, when needed corrections to all systems are to be carried out. Today's maintenance management tools at CERN are seen as too slow and cumbersome for such a challenge. The short duration of the technical stops (72 h/month) requires preparation of jobs in advance, and coordination of all involved teams; at the same time, the radio-protection of personnel in the LHC underground areas imposes a strict "As Low As Reasonably Achievable"(ALARA) policy for the works' duration. In order to perform a maximum of tasks in a short time, a mobile tool for the manipulation of job and equipment data has been created. The ability to signal a new job to a team in the field will avoid unnecessary trips to the tunnel; the signalling of a job's completion (and its details) will allow subsequent jobs to start promptly and with more information; finally, the possibility to consult equipment's full manufacturing and installation data "in situ" will help...

  5. Heavy ion beam probe operation in time varying equilibria of improved confinement reversed field pinch discharges

    SciTech Connect (OSTI)

    Demers, D. R.; Chen, X.; Schoch, P. M. [Rensselaer Polytechnic Institute, Troy, New York 12180 (United States); Fimognari, P. J. [University of Wisconsin, Madison, Wisconsin 53706 (United States)

    2010-10-15

    Operation of a heavy ion beam probe (HIBP) on a reversed field pinch is unique from other toroidal applications because the magnetic field is more temporal and largely produced by plasma current. Improved confinement, produced through the transient application of a poloidal electric field which leads to a reduction of dynamo activity, exhibits gradual changes in equilibrium plasma quantities. A consequence of this is sweeping of the HIBP trajectories by the dynamic magnetic field, resulting in motion of the sample volume. In addition, the plasma potential evolves with the magnetic equilibrium. Measurement of the potential as a function of time is thus a combination of temporal changes of the equilibrium and motion of the sample volume. A frequent additional complication is a nonideal balance of ion current on the detectors resulting from changes in the beam trajectory (magnetic field) and energy (plasma potential). This necessitates use of data selection criteria. Nevertheless, the HIBP on the Madison Symmetric Torus has acquired measurements as a function of time throughout improved confinement. A technique developed to infer the potential in the improved confinement reversed field pinch from HIBP data in light of the time varying plasma equilibrium will be discussed.

  6. Real-Time Traffic Information for Emergency Evacuation Operations: Phase A Final Report

    SciTech Connect (OSTI)

    Franzese, Oscar [ORNL; Zhang, Li [Mississippi State University (MSU); Mahmoud, Anas M. [Mississippi State University (MSU); Lascurain, Mary Beth [ORNL; Wen, Yi [Mississippi State University (MSU)

    2010-05-01

    There are many instances in which it is possible to plan ahead for an emergency evacuation (e.g., an explosion at a chemical processing facility). For those cases, if an accident (or an attack) were to happen, then the best evacuation plan for the prevailing network and weather conditions would be deployed. In other cases (e.g., the derailment of a train transporting hazardous materials), there may not be any previously developed plan to be implemented and decisions must be made ad-hoc on how to proceed with an emergency evacuation. In both situations, the availability of real-time traffic information plays a critical role in the management of the evacuation operations. To improve public safety during a vehicular emergency evacuation it is necessary to detect losses of road capacity (due to incidents, for example) as early as possible. Once these bottlenecks are identified, re-routing strategies must be determined in real-time and deployed in the field to help dissipate the congestion and increase the efficiency of the evacuation. Due to cost constraints, only large urban areas have traffic sensor deployments that permit access to some sort of real-time traffic information; any evacuation taking place in any other areas of the country would have to proceed without real-time traffic information. The latter was the focus of this SERRI/DHS (Southeast Region Research Initiative/Department of Homeland Security) sponsored project. That is, the main objective on the project was to improve the operations during a vehicular emergency evacuation anywhere by using newly developed real-time traffic-information-gathering technologies to assess traffic conditions and therefore to potentially detect incidents on the main evacuation routes. Phase A of the project consisted in the development and testing of a prototype system composed of sensors that are engineered in such a way that they can be rapidly deployed in the field where and when they are needed. Each one of these sensors is also equipped with their own power supply and a GPS (Global Positioning System) device to auto-determine its spatial location on the transportation network under surveillance. The system is capable of assessing traffic parameters by identifying and re-identifying vehicles in the traffic stream as those vehicles pass over the sensors. The system of sensors transmits, through wireless communication, real-time traffic information (travel time and other parameters) to a command and control center via an NTCIP (National Transportation Communication for ITS Protocol) -compatible interface. As an alternative, an existing NTCIP-compatible system accepts the real-time traffic information mentioned and broadcasts the traffic information to emergency managers, the media and the public via the existing channels. A series of tests, both in a controlled environment and on the field, were conducted to study the feasibility of rapidly deploying the system of traffic sensors and to assess its ability to provide real-time traffic information during an emergency evacuation. The results of these tests indicated that the prototype sensors are reliable and accurate for the type of application that is the focus of this project.

  7. Time- and power-dependent operation of a parametric spin-wave amplifier

    SciTech Connect (OSTI)

    Brächer, T.; Heussner, F.; Pirro, P.; Fischer, T.; Geilen, M.; Heinz, B.; Lägel, B.; Serga, A. A.; Hillebrands, B.

    2014-12-08

    We present the experimental observation of the localized amplification of externally excited, propagating spin waves in a transversely in-plane magnetized Ni{sub 81}Fe{sub 19} magnonic waveguide by means of parallel pumping. By employing microfocussed Brillouin light scattering spectroscopy, we analyze the dependency of the amplification on the applied pumping power and on the delay between the input spin-wave packet and the pumping pulse. We show that there are two different operation regimes: At large pumping powers, the spin-wave packet needs to enter the amplifier before the pumping is switched on in order to be amplified while at low powers the spin-wave packet can arrive at any time during the pumping pulse.

  8. Running time variability and resource allocation : a data-driven analysis of high-frequency bus operations

    E-Print Network [OSTI]

    Sánchez-Martínez, Gabriel Eduardo

    2013-01-01

    Running time variability is one of the most important factors determining service quality and operating cost of high-frequency bus transit. This research aims to improve performance analysis tools currently used in the bus ...

  9. Double Eagle II Airport (AEG) Pavement Condition and Analysis

    E-Print Network [OSTI]

    Cal, Mark P.

    .........................................................7. Maintenance and Rehabilitation (M&R) Options 21 ...............Table 9. Current NMDOT-Aviation Airport Development Administrator New Mexico Aviation Division P.O. Box 9830 Albuquerque, NM 87119 tel No Maintenance 11 .....................Table 4. Predicted Pavement Conditions (PCI) Assuming no Maintenance 12

  10. Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada

    SciTech Connect (OSTI)

    J. Engelbrecht; I. Kavouras; D Campbell; S. Campbell; S. Kohl, D. Shafer

    2008-08-01

    The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

  11. Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada

    SciTech Connect (OSTI)

    J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

    2009-04-02

    The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

  12. Operator Objective Function Guidance for a Real-time Unmanned Vehicle Scheduling Algorithm

    E-Print Network [OSTI]

    Clare, A.S.

    Advances in autonomy have made it possible to invert the typical operator-to-unmanned-vehicle ratio so that asingle operator can now control multiple heterogeneous unmanned vehicles. Algorithms used in unmanned-vehicle ...

  13. Measure Guideline: Condensing Boilers - Optimizing Efficiency and Response Time During Setback Operation

    SciTech Connect (OSTI)

    Arena, L.

    2014-02-01

    Conventional wisdom surrounding space heating has told us a couple of things consistently for several years now: size the mechanical systems to the heating loads and setting the thermostat back at night will result in energy savings. The problem is these two recommendations oppose each other. A system that is properly sized to the heating load will not have the extra capacity necessary to recover from a thermostat setback, especially at design conditions. The implication of this is that, for setback to be successfully implemented, the heating system must be oversized. This issue is exacerbated further when an outdoor reset control is used with a condensing boiler, because not only is the system matched to the load at design, the outdoor reset control matches the output to the load under varying outdoor temperatures. Under these circumstances, the home may never recover from setback. Special controls to bypass the outdoor reset sensor are then needed. Properly designing a hydronic system for setback operation can be accomplished but depends on several factors. Determining the appropriateness of setback for a particular project is the first step. This is followed by proper sizing of the boiler and baseboard to ensure the needed capacity can be met. Finally, control settings must be chosen that result in the most efficient and responsive performance. This guide provides step by step instructions for heating contractors and hydronic designers for selecting the proper control settings to maximize system performance and improve response time when using a thermostat setback.

  14. Measure Guideline: Condensing Boilers—Optimizing Efficiency and Response Time During Setback Operation

    SciTech Connect (OSTI)

    Arena, L.

    2014-02-01

    Conventional wisdom surrounding space heating has consistently stated two things: size the mechanical systems to the heating loads, and setting the thermostat back at night will result in energy savings. The problem is these two recommendations oppose each other. A system that is properly sized to the heating load will not have the extra capacity necessary to recover from a thermostat setback, especially at design conditions. The implication of this is that, for setback to be successfully implemented, the heating system must be oversized. This issue is exacerbated further when an outdoor reset control is used with a condensing boiler, because not only is the system matched to the load at design, the outdoor reset control matches the output to the load under varying outdoor temperatures. Under these circumstances, the home may never recover from setback. Special controls to bypass the outdoor reset sensor are then needed. Properly designing a hydronic system for setback operation can be accomplished but depends on several factors. The first step is to determine the appropriateness of setback for a particular project. This is followed by proper sizing of the boiler and baseboard to ensure the needed capacity can be met. Finally, control settings must be chosen that result in the most efficient and responsive performance. This guide provides step-by-step instructions for heating contractors and hydronic designers for selecting the proper control settings to maximize system performance and improve response time when using a thermostat setback.

  15. Airport Modern: The Space between International Departures and Arrivals in Modern Korean National Imaginings

    E-Print Network [OSTI]

    Kim, Alice S.

    2013-01-01

    of National(ist) Journeys: Transcontinental Railroads, theAirport Modern: Transcontinental Railways to Transpacificreplaced colonial-era transcontinental railways in the

  16. Real-time operations planning and control of high-frequency transit

    E-Print Network [OSTI]

    Sánchez-Martínez, Gabriel Eduardo

    2015-01-01

    High-frequency transit systems are essential for the socioeconomic and environmental well-being of large and dense cities. The planning and control of their operations are important determinants of service quality. Transit ...

  17. Annual Spring Experiments aim to accelerate the transfer of promising new concepts and tools from research to operations through intensive real-time forecasts and evaluations.

    E-Print Network [OSTI]

    Xue, Ming

    research to operations through intensive real-time forecasts and evaluations. B ackground. Each spring research to operations, while inspiring new initiatives for operationally relevant research, through a combined forecast and research area situated between the SPC and OUN operations rooms (Fig. 1

  18. COTS Real-Time Operating Systems in Space Ljerka Beus-Dukic

    E-Print Network [OSTI]

    Beus-Dukic, Ljerka

    instrumentation, enables satellite to be observed and controlled, and protects it in case of failure. The main Applications Space applications can be broadly divided into ground and on-board applications. Ground systems provide ground and operational support for space missions (e.g. International Space Station). Ground

  19. AN OPERATOR EXPERIENCE WITH A HIERARCHICAL REAL-TIME CONTROL SYSTEM (RCS)

    E-Print Network [OSTI]

    automation project1 . We used the SSN 637 class nuclear submarine data as our model. With the given level of this report. In a submarine automation project, we have studied the logical structure of the operator Division of the National Institute of Standards and Technology (NIST) supported an ARPA submarine

  20. An interpretation of information gained from residence time distribution studies for operation of biological reactors 

    E-Print Network [OSTI]

    Dodge, Marlow Lee

    1971-01-01

    concentration, maximum continuous flow stirred tank reactor cascade of stirred tank reactors C 8 concentration of substrate Cs concentration of substrate, initial Csn concentration of substrate in nth tank concentration of tracer GTQ concentration... of tracer, initial P. F. A, plug-flow assumption volumetric flow rate sludge wastage flow rate rate of reaction r~cs) R. T. D. F. reaction rate with respect to C s residence time distribution function real time TAU ( r) detention time V...

  1. The Integrated Airport: Building a Successful NextGen Testbed

    ScienceCinema (OSTI)

    Frederick-Recascino, Christina [Embry-Riddle Aeronautical University, Daytona Beach, Florida, United States]; Sweigard, Doug [Lockheed Martin Corporation]; Lester, Wade [ERAU

    2010-01-08

    This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment.  NextGen refers to the program that will be initiated to modernize the US National Airspace.  As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success.  This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation. 

  2. Alternative Fuels Data Center: Atlanta Airport Converts Shuttles to CNG

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L O O D S TA I NLoans The Oregon DepartmentAtlanta Airport

  3. Alternative Fuels Data Center: Propane Powers Airport Shuttles in New

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B L O O D S TA IMarylandOrleans Propane Powers Airport Shuttles

  4. Airport Drive, Missouri: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowaWisconsin: Energy ResourcesAir Quality Jump to:Airforce Wind FarmAirport

  5. 3D weak-dispersion reverse time migration using a stereo-modeling operator

    E-Print Network [OSTI]

    Li, Jingshuang

    Reliable 3D imaging is a required tool for developing models of complex geologic structures. Reverse time migration (RTM), as the most powerful depth imaging method, has become the preferred imaging tool because of its ...

  6. Development and operativity of a real-time radiological monitoring network centered on the nuclear power plant of Almaraz (Spain)

    SciTech Connect (OSTI)

    Baeza, A.; Miro, C.; Puerto, J.A. del; Rio, M. del; Ortiz, F.; Paniagua, J.M.

    1993-12-01

    This work presents the hardware and software characteristics of the environmental surveillance radiological network that has been installed around the nuclear power station of Almaraz (Spain). A description is given of the program RADLINE which allows radiological data to be logged in real time, and a study is made of the operativity of the network and the methodology followed in establishing the radiological pre-alert and alert levels.

  7. Exploring the Tradeoff between Waiting Time and Service Cost in Non-Asymptotic Operating Regimes

    E-Print Network [OSTI]

    Srikant, Rayadurgam

    Bin Li, Ozgur Dalkilic and Atilla Eryilmaz Abstract--Motivated by the problem of demand management in smart grids, we study the problem of minimizing a weighted- sum of the mean delay of user demands proposed with asymptotic optimality guarantees. For example, for energy minimization problem in time

  8. Time-dependent Maxwell field operators and field energy density for an atom near a conducting wall

    E-Print Network [OSTI]

    R. Vasile; R. Messina; R. Passante

    2009-03-18

    We consider the time evolution of the electric and magnetic field operators for a two-level atom, interacting with the electromagnetic field, placed near an infinite perfectly conducting wall. We solve iteratively the Heisenberg equations for the field operators and obtain the electric and magnetic energy density operators around the atom (valid for any initial state). Then we explicitly evaluate them for an initial state with the atom in its bare ground state and the field in the vacuum state. We show that the results can be physically interpreted as the superposition of the fields propagating directly from the atom and the fields reflected on the wall. Relativistic causality in the field propagation is discussed. Finally we apply these results to the calculation of the dynamical Casimir-Polder interaction energy in the far zone between two atoms when a boundary condition such as a conducting wall is present. Magnetic contributions to the interatomic Casimir-Polder interaction in the presence of the wall are also considered. We show that, in the limit of large times, the known results of the stationary case are recovered.

  9. Operating System Concepts with Java 7th Edition, Nov 15, 2006 Silberschatz, Galvin and Gagne 2007 Chapter 19: Real-Time Systems

    E-Print Network [OSTI]

    Bezrukov, Sergei

    Operating System Concepts with Java ­ 7th Edition, Nov 15, 2006 Silberschatz, Galvin and Gagne ©2007 Chapter 19: Real-Time Systems #12;19.2 Silberschatz, Galvin and Gagne ©2007Operating System Concepts with Java ­ 7th Edition, Nov 15, 2006Operating System Concepts with Java ­ 7th Edition, Nov 15

  10. Monitoring and simulating real-time electric power system operation with phasor measurements

    SciTech Connect (OSTI)

    Phadke, A.G. [Virginia Polytechnic Inst. and State Univ., Blacksburg, VA (United States)] [Virginia Polytechnic Inst. and State Univ., Blacksburg, VA (United States); Thorp, J.S. [American Electric Power Corp. (United States)] [American Electric Power Corp. (United States)

    1995-01-01

    In this research project, two important results have been achieved. The concept of generator axis load flow has been developed more fully, and has been tested through simulations on the 39-bus system (with 10 generators). Generator axis load flow is a load flow calculation which views the entire network from a few retained buses such as the internal nodes of the generators. As these nodes can be indirectly monitored in real time through phasor measurements of generator terminal quantities, it becomes possible to track and predict the behavior of the entire network from these few observation points. This is extremely valuable in the task of predicting network instability in real time. The task of instability prediction of a multi-machine power system is one of the most difficult analytical exercises. We investigated two of the most promising approaches: the extended equal area method, and the transient energy function method. Although both of these methods work well in many instances, we have shown that in other cases, the predictions made by the two methods are incorrect. The failure of the methods can be traced to their inability to deal with the behavior of the system after the first turning point of the motor swing curves. Instead of using these methods, we propose the direct integration of the machine swing equations following the start of a disturbance. Coupled with the generator aids load flow developed above, and using the high speed computers available now, we show that for systems of significant size (39 bus system), accurate predictions through direct computation are possible. The report also includes results on computational efficiency of the method of faster-than-real-time integration using machine equations and the generator aids load flow. It is anticipated that this technique will be useful in most practical applications in power system control centers of the future.

  11. The application of time-motion study principles to retail flower store operations 

    E-Print Network [OSTI]

    Tolle, Leon J., Jr

    1952-01-01

    SYSTE &IS OF WAGE PAYillENT & (2) EST I MATE DIRECT AND INDIRECT LABOR COSTS (3) ESTABLISH CONTROL SYSTEMS FOR PRODUCTION COSTS& (4. ) PROVIDE A BASIS FOR RAT INQ THE PER FORMANCE OF EMPLOYEES& ($) CREATE A BETTER UNDERSTAiNDINQ OF ALL DUTIES ~ (3...) THE. BENEF I TS OF ANALYSES INC I DENT TO T I VE STUDY I NCLUDE, ( ( ) IMPROVE&IENTS IN LAYOUTS AND (2) DETERMI IYAT ION OF ECONOMICAL ANO PRACT I CAL LABOR COSTS ~ (3) IN RECORDING AND ANALYZING THE RESULTS OF HIS W'ORK& THE TIME-MOTION ENGINEER...

  12. http://tti.tamu.edu > Variable message signs > Traffic actuated controllers > Traffic signals > Flashing traffic signals > Lane use control signals > Road markings > Rumble strips > Warrants (Traffic control devices) > Gro

    E-Print Network [OSTI]

    and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian > Measures of effectiveness > Traffic models > Traffic simula Saving Lives, Time and Resources AviAtion Rese

  13. Detiding DART buoy data for real-time extraction of source coefficients for operational tsunami forecasting

    E-Print Network [OSTI]

    Percival, Donald B; Eble, Marie C; Gica, Edison; Huang, Paul Y; Mofjeld, Harold O; Spillane, Michael C; Titov, Vasily V; Tolkova, Elena I

    2014-01-01

    U.S. Tsunami Warning Centers use real-time bottom pressure (BP) data transmitted from a network of buoys deployed in the Pacific and Atlantic Oceans to tune source coefficients of tsunami forecast models. For accurate coefficients and therefore forecasts, tides at the buoys must be accounted for. In this study, five methods for coefficient estimation are compared, each of which accounts for tides differently. The first three subtract off a tidal prediction based on (1) a localized harmonic analysis involving 29 days of data immediately preceding the tsunami event, (2) 68 pre-existing harmonic constituents specific to each buoy, and (3) an empirical orthogonal function fit to the previous 25 hrs of data. Method (4) is a Kalman smoother that uses method (1) as its input. These four methods estimate source coefficients after detiding. Method (5) estimates the coefficients simultaneously with a two-component harmonic model that accounts for the tides. The five methods are evaluated using archived data from eleven...

  14. Estimation of the economic relationship of an airport to the regional economy : a critical analysis

    E-Print Network [OSTI]

    Fortune, Stephen James

    1981-01-01

    In the past decade many major U.S. airports have encountered extensive opposition to plans for future growth and expansion from environmentalists and community groups who cite the noise and air pollution created and the ...

  15. Market-Based Alternatives for Managing Congestion at New York's LaGuardia Airport

    E-Print Network [OSTI]

    representatives and other members of the air transportation community. The first simulation placed participants been used at some airports, such as London Heathrow and Paris Charles de Gaulle, since the early 1970s

  16. Estimating current and future benefits of airport surface congestion management techniques

    E-Print Network [OSTI]

    Nakahara, Alex (Alex Hiroo)

    2012-01-01

    Air traffic is expected to continue to grow in the future and improved methods for dealing with the increased demand on the system need to be designed and implemented. One method for reducing surface congestion at airports ...

  17. Energy, Shading and Daylighting Analysis for the Austin Bergstrom International Airport Terminal 

    E-Print Network [OSTI]

    Holder, L. M. III; Holder, L. M. IV

    2002-01-01

    Our firm was under contract with the City of Austin, Texas to perform energy analysis and analysis of the daylighting potential within the New Austin Bergstrom International Airport Terminal. Design of the Passenger Terminal Facility for the New...

  18. Improved Approach to Lidar Airport Obstruction Surveying Using Full-Waveform Data

    E-Print Network [OSTI]

    Nowak, Robert

    . Parrish1 and Robert D. Nowak2 ABSTRACT Over the past decade, the National Oceanic and Atmospheric, or building that penetrates an airport's obstruction identification surfaces (OIS) (FAA 1996; FAA 2008

  19. A Study on the Effects of Unwanted Air Infiltration on Thermal Comfort at an Airport Terminal 

    E-Print Network [OSTI]

    Lander, B.; Wei, G.; Claridge, D.; Caeiro, J.

    2009-01-01

    the comfort levels that people have become accustomed to in public buildings. Airport terminal buildings, such as the one in this study, built before the current energy awareness that is prevalent today have many problems associated with air infiltration...

  20. Electric Ground Support Equipment Advanced Battery Technology Demonstration Project at the Ontario Airport

    SciTech Connect (OSTI)

    Tyler Gray; Jeremy Diez; Jeffrey Wishart; James Francfort

    2013-07-01

    The intent of the electric Ground Support Equipment (eGSE) demonstration is to evaluate the day-to-day vehicle performance of electric baggage tractors using two advanced battery technologies to demonstrate possible replacements for the flooded lead-acid (FLA) batteries utilized throughout the industry. These advanced battery technologies have the potential to resolve barriers to the widespread adoption of eGSE deployment. Validation testing had not previously been performed within fleet operations to determine if the performance of current advanced batteries is sufficient to withstand the duty cycle of electric baggage tractors. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. This report summarizes the work performed and data accumulated during this demonstration in an effort to validate the capabilities of advanced battery technologies. The demonstration project also grew the relationship with Southwest Airlines (SWA), our demonstration partner at Ontario International Airport (ONT), located in Ontario, California. The results of this study have encouraged a proposal for a future demonstration project with SWA.

  1. Operation Greenhouse. Scientific Director's report of atomic weapon tests at Eniwetok, 1951. Annex 1. 1. Prompt-gamma-ray measurements. Part 3. The measurement of transit time

    SciTech Connect (OSTI)

    Hall, W.C.

    1985-04-01

    This report describes the procedures followed in measuring the transit time of the atomic explosions evaluated in Operation Greenhouse. It includes a description of the equipment used, the installations made, and the results obtained. Transmit time measurements were obtainded for the Easy, George and Item Shots; and on the whole, the transit-time recording equipment performed well.

  2. Structure finance for hybrid infrastructure models : the application of project finance into public-private partnerships for the construction and operation of infrastructure

    E-Print Network [OSTI]

    Patramanis, Theodoros

    2006-01-01

    This thesis studies the application of project finance as the most efficient financing method for the construction and operation of infrastructure projects such as motorways, airports, power plants, pipelines, wastewater/sewage ...

  3. int. j. prod. res., 01 June 2004, vol. 42, no. 11, 21792196 Flexible modelling of correlated operation times with application in

    E-Print Network [OSTI]

    and disassemble used products (reverse logistics). In the face of these complexities, the ability operation times. A logistic regression model is used to estimate the distribution of the binary random; operation necessity and duration; replacement part needs; and a reverse distribution system to acquire

  4. Public Funding of Airport Incentives: The Efficacy of the Small Community Air Service Development Grant (SCASDG) Program

    E-Print Network [OSTI]

    Wittman, Michael D.

    2014-01-08

    As U.S. airlines began to restrict available domestic capacity at smaller airports in 2008 as a result of higher

  5. Puget Sound Operational Forecast System - A Real-time Predictive Tool for Marine Resource Management and Emergency Responses

    SciTech Connect (OSTI)

    Yang, Zhaoqing; Khangaonkar, Tarang; Chase, Jared M.; Wang, Taiping

    2009-12-01

    To support marine ecological resource management and emergency response and to enhance scientific understanding of physical and biogeochemical processes in Puget Sound, a real-time Puget Sound Operational Forecast System (PS-OFS) was developed by the Coastal Ocean Dynamics & Ecosystem Modeling group (CODEM) of Pacific Northwest National Laboratory (PNNL). PS-OFS employs the state-of-the-art three-dimensional coastal ocean model and closely follows the standards and procedures established by National Oceanic and Atmospheric Administration (NOAA) National Ocean Service (NOS). PS-OFS consists of four key components supporting the Puget Sound Circulation and Transport Model (PS-CTM): data acquisition, model execution and product archive, model skill assessment, and model results dissemination. This paper provides an overview of PS-OFS and its ability to provide vital real-time oceanographic information to the Puget Sound community. PS-OFS supports pacific northwest region’s growing need for a predictive tool to assist water quality management, fish stock recovery efforts, maritime emergency response, nearshore land-use planning, and the challenge of climate change and sea level rise impacts. The structure of PS-OFS and examples of the system inputs and outputs, forecast results are presented in details.

  6. Uranium characterization at the St. Louis Airport Site

    SciTech Connect (OSTI)

    Schilk, A.J.; Hubbard, C.W.; Bowyer, T.W. [Pacific Northwest Lab., Richland, WA (United States); Reiman, R.T. [Technical Measurement Co., Boulder, CO (United States)

    1995-05-01

    In support of the Department of Energy/Office of Technology Development`s Expedited Site Characterization (ESC) project (coordinated by Ames Laboratory), the Pacific Northwest Laboratory demonstrated two complementary technologies at the St. Louis Airport (SLAP) site that have been designed and optimized for the rapid, in situ quantification of radionuclide contamination in surface soils. The sensors are optimized for the detection of high-energy beta particles or gamma rays emitted from the decay of specific radionuclides of interest. These technologies were demonstrated by measuring the beta and gamma fluxes at several locations within the SLAP site. Measurements were converted to average contamination levels, using detector calibrations performed with spiked samples (beta) or sealed sources (gamma). Additionally, subsurface activity levels were derived from discrete soil samples (provided by the ESC field crew) via gamma-ray spectrometry in a controlled laboratory setting. Since the beta and gamma sensor technologies are intrinsically sensitive to different types of radiation and activity distributions (i.e., surface and shallow subsurface, respectively), the data obtained from the two detectors provide complementary information about the distribution of the contamination. The results reported here suggest that a number of locations within the SLAP site have elevated levels of {sup 211}U, and the differences between the beta and gamma activities indicate that the contamination is largely located near the surface of the soil.

  7. Continuous-Time Markov Decision Processes 243 Vidale M.L. and Wolfe H.B. (1957). An Operations Research Study of Sales

    E-Print Network [OSTI]

    Cao, Xiren

    1957-01-01

    Continuous-Time Markov Decision Processes 243 Vidale M.L. and Wolfe H.B. (1957). An Operations. Theoretical Population Biology 11, 182­238. Wu C.B. (1997). Continuous Time Markov Decision Processes in Continuous in Action Markov Decision Processes. SIAM Journal on Control and Optimization 35, 2157­ 2182

  8. ADEPT SCIENTIFIC ENDNOTE LANDESLIZENZ VEREINBARUNG Dies ist eine Vereinbarung zwischen Thomson ResearchSoft mit Hauptsitz in 2141 Palomar Airport Road, Suite 350,

    E-Print Network [OSTI]

    Ott, Albrecht

    ResearchSoft mit Hauptsitz in 2141 Palomar Airport Road, Suite 350, Carlsbad, CA 92009, USA vertreten durch

  9. MRI T2 RELAXATION TIME EVALUATION OF WRIST CARTILAGE WITH SCAPHOLUNATE LIGAMENT INJURY IN THE PRE-OPERATIVE AND POST-OPERATIVE STATE

    E-Print Network [OSTI]

    Sturgeon, Dannica Leigh

    2011-04-27

    (GAG) concentration in cartilage by observing the amount of contrast agent uptake over a period of time in the cartilage and calculating the T1 relaxation time (6). Article submitted to the Journal of Orthopaedic Research 34 T2-weighted MRI has... been extensively used in clinical setting to characterize alterations of tissue in injury or diseases because T2 is sensitive to the alterations of biophysical and biochemical environment of water molecules in tissue. Compared to other MRI...

  10. Paper No. 11.05 1 A Half Century of Tapered-Pile Usage at the John F. Kennedy International Airport

    E-Print Network [OSTI]

    Horvath, John S.

    Paper No. 11.05 1 A Half Century of Tapered-Pile Usage at the John F. Kennedy International Airport. Kennedy International Airport (JFKIA) in New York City began in the late 1940s. Timber piles were used the well-known John F. Kennedy International Airport (JFKIA, originally named New York International

  11. A VIRTUAL OPERATING SYSTEM

    E-Print Network [OSTI]

    Hall, Dennis E.

    2013-01-01

    Unix time-sharing operating system. D. Hall, D. Scherrer, J.Prentice~Hall, Hansen, "Operating System Principles", Inc. ,of California. A Virtual Operating System Dennis E. Hall

  12. Airports and Bicycles: what are the obstacles and incentives for operators 1 to improve bicycle access?

    E-Print Network [OSTI]

    Orrick, Phyllis; Frick, Karen Trapenberg

    2013-01-01

    examining investments in bicycle-oriented design through afastlane.dot.gov/2010/07/us-bicycle-route-system-begins-2011 26. Port of Portland. Bicycle Resources page. (http://

  13. Optimization of airport terminal-area air traffic operations under uncertain weather conditions

    E-Print Network [OSTI]

    Pfeil, Diana Michalek

    2011-01-01

    Convective weather is responsible for large delays and widespread disruptions in the U.S. National Airspace System, especially during summer. Although Air Traffic Flow Management algorithms exist to schedule and route ...

  14. Application of Time-Lapse Seismic Monitoring for the Control and Optimization of CO2 Enhanced Oil Recovery Operations

    SciTech Connect (OSTI)

    Brian Toelle

    2008-11-30

    This project, 'Application of Time-Lapse Seismic Monitoring for the Control and Optimization of CO{sub 2} Enhanced Oil Recovery Operations', investigated the potential for monitoring CO{sub 2} floods in carbonate reservoirs through the use of standard p-wave seismic data. This primarily involved the use of 4D seismic (time lapse seismic) in an attempt to observe and map the movement of the injected CO{sub 2} through a carbonate reservoir. The differences between certain seismic attributes, such as amplitude, were used for this purpose. This technique has recently been shown to be effective in CO{sub 2} monitoring in Enhanced Oil Recovery (EOR) projects, such as Weyborne. This study was conducted in the Charlton 30/31 field in the northern Michigan Basin, which is a Silurian pinnacle reef that completed its primary production in 1997 and was scheduled for enhanced oil recovery using injected CO{sub 2}. Prior to injection an initial 'Base' 3D survey was obtained over the field and was then processed and interpreted. CO{sub 2} injection within the main portion of the reef was conducted intermittently during 13 months starting in August 2005. During this time, 29,000 tons of CO{sub 2} was injected into the Guelph formation, historically known as the Niagaran Brown formation. By September 2006, the reservoir pressure within the reef had risen to approximately 2000 lbs and oil and water production from the one producing well within the field had increased significantly. The determination of the reservoir's porosity distribution, a critical aspect of reservoir characterization and simulation, proved to be a significant portion of this project. In order to relate the differences observed between the seismic attributes seen on the multiple 3D seismic surveys and the actual location of the CO{sub 2}, a predictive reservoir simulation model was developed based on seismic attributes obtained from the base 3D seismic survey and available well data. This simulation predicted that the CO{sub 2} injected into the reef would remain in the northern portion of the field. Two new wells, the State Charlton 4-30 and the Larsen 3-31, were drilled into the field in 2006 and 2008 respectively and supported this assessment. A second (or 'Monitor') 3D seismic survey was acquired during September 2007 over most of the field and duplicated the first (Base) survey, as much as possible. However, as the simulation and new well data available at that time indicated that the CO{sub 2} was concentrated in the northern portion of the field, the second seismic survey was not acquired over the extreme southern end of the area covered by the original (or Base) 3D survey. Basic processing was performed on the second 3D seismic survey and, finally, 4D processing methods were applied to both the Base and the Monitor surveys. In addition to this 3D data, a shear wave seismic data set was obtained at the same time. Interpretation of the 4D seismic data indicated that a significant amplitude change, not attributable to differences in acquisition or processing, existed at the locations within the reef predicted by the reservoir simulation. The reservoir simulation was based on the porosity distribution obtained from seismic attributes from the Base 3D survey. Using this validated reservoir simulation the location of oil within the reef at the time the Monitor survey was obtained and recommendations made for the drilling of additional EOR wells. The economic impact of this project has been estimated in terms of both enhanced oil recovery and CO{sub 2} sequestration potential. In the northern Michigan Basin alone, the Niagaran reef play is comprised of over 700 Niagaran reefs with reservoirs already depleted by primary production. Potentially there is over 1 billion bbls of oil (original oil in place minus primary recovery) remains in the reefs in Michigan, much of which could be more efficiently mobilized utilizing techniques similar to those employed in this study.

  15. Development of a hybrid intelligent system for on-line real-time monitoring of nuclear power plant operations

    E-Print Network [OSTI]

    Yildiz, Bilge, 1976-

    2003-01-01

    A nuclear power plant (NPP) has an intricate operational domain involving systems, structures and components (SSCs) that vary in scale and complexity. Many of the large scale SSCs contribute to the lost availability in the ...

  16. STRATEGIC PLANNING FOR AIRPORT CAPACITY: An Appreciation of Australia's Process for Sydney1

    E-Print Network [OSTI]

    1 STRATEGIC PLANNING FOR AIRPORT CAPACITY: An Appreciation of Australia's Process for Sydney1 demonstrating by example the advantages of strategic planning as compared to traditional master planning. Strategic planning recognises that there is massive uncertainty in long-term forecasts, and consequently

  17. A Portable Low-Cost High Density Sensor Network for Air Quality at London Heathrow Airport

    E-Print Network [OSTI]

    Jackson, Sophie

    species: CO, NO, O3, SO2, NO2 (electrochemical (EC) at 2 s) CO2 and total VOCs (optical at 10 s). · Size stations outside LHR (all CO2, sizeA Portable Low-Cost High Density Sensor Network for Air Quality at London Heathrow Airport Olalekan

  18. Implementation of alternative bio-based fuels in aviation: The Clean Airports Program

    SciTech Connect (OSTI)

    Shauck, M.E.; Zanin, M.G.

    1997-12-31

    The Renewable Aviation Fuels Development Center at Baylor University in Waco, Texas, was designated, in March 1996, by the US Department of Energy (US DOE) as the national coordinator of the Clean Airports Program. This program, a spin-off of the Clean Cities Program, was initiated to increase the use of alternative fuels in aviation. There are two major fuels used in aviation today, the current piston engine aviation gasoline, and the current turbine engine fuel. The environmental impact of each of these fuels is significant. Aviation Gasoline (100LL), currently used in the General Aviation piston engine fleet, contributes 100% of the emissions containing lead in the USA today. In the case of the turbine engine fuel (Jet fuel), there are two major environmental impacts to be considered: the local, in the vicinity of the airports, and the global impact on climate change. The Clean Airports Program was established to promote the use of clean burning fuels in order to achieve and maintain clean air at and in the vicinities of airports through the use of alternative fuel-powered air and ground transportation vehicles.

  19. HumanWildlife Conflicts 2(2):240247, Fall 2008 Mammalian hazards at small airports in

    E-Print Network [OSTI]

    fence maintenance is vital for effective wildlife- strike management at small airports. Key words,000 hours of aircraft downtime each year and cost the civil aviation industry >$556 million annually (Cleary the inception of aviation 100 years ago (Sodhi 2002). Unfortunately, the probability of wildlife strikes

  20. Detection Probability Modeling for Airport Wind-Shear August 28, 2008

    E-Print Network [OSTI]

    Cho, John Y. N.

    Detection Probability Modeling for Airport Wind-Shear Sensors August 28, 2008 John Y. N. Cho Robert An objective wind-shear detection probability estimation model is developed for radar, lidar, and sensor combinations. The model includes effects of system sensitivity, site-specific wind-shear, clutter, and terrain

  1. Directions to the University of Connecticut Storrs Campus From Bradley International Airport

    E-Print Network [OSTI]

    Olshevsky, Vadim

    Directions to the University of Connecticut ­ Storrs Campus From Bradley International Airport on Connecticut Route 195 about 6 miles to the University. (You will come to the intersection of Rt. 195 and Rt of the exit ramp. Travel south on Connecticut Route 195 about 6 miles to the University. (You will come

  2. A Phase I Cultural Resources Survey of the Easterwood Airport Project in Central Brazos County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-30

    An archaeological survey of 4.2 acre tract at Easterwood Airport in the city limits of College Station, Texas (central Brazos County) was conducted on May 10, 2002 by Brazos Valley Research Associates of Bryan, Texas. The Texas A&M University...

  3. Federal Aviation Administration's Airport Capital Improvement Program Development Process

    E-Print Network [OSTI]

    Tener, Scott D.

    2009-12-18

    annual itinerant operations by critical aircraft, crosswind runway needed for 95% wind coverage, parallel taxiways needed for runway sight distance, instrument approach procedure, eliminate runway back taxi, waiting list, etc. • Cost Estimate... annual itinerant operations by critical aircraft, crosswind runway needed for 95% wind coverage, parallel taxiways needed for runway sight distance, instrument approach procedure, eliminate runway back taxi, waiting list, etc. • Cost Estimate...

  4. Report on the 2014 Major Airports Survey by Andrew McCrindell and Alicia Tuppack, Major Airport Services

    E-Print Network [OSTI]

    Greenslade, Diana

    common concerns with untimely forecasts: insufficient fuel, lack of alternate option, safety compromised operators such as the Royal Flying Doctor Service (RFDS), and general aviation operators including outside of the 5nm TAF area. Only 24% of respondents used the Bureau aviation knowledge centre. Accuracy

  5. Why some airport-rail links get built and others do not : the role of institutions, equity and financing

    E-Print Network [OSTI]

    Nickel, Julia, S.M. Massachusetts Institute of Technology

    2011-01-01

    The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O'Hare and Paris-Charles de ...

  6. Using a Constant Volume Displacement Ventilation System to Create a Micro Climate in a Large Airport Terminal in Bangkok 

    E-Print Network [OSTI]

    Simmonds, P.; Gaw, W.

    1996-01-01

    In order to conserve energy and create a comfortable climate for both passengers and workers at a new large international airport in Thailand, a design concept was created where only the first 2m above the occupied zone is conditioned...

  7. Operation Greenhouse. Scientific Director's report of atomic weapon tests at Eniwetok, 1951. Annex 1. 5. Neutron measurements. Part 3. High-energy spectrum (time-of-flight method)

    SciTech Connect (OSTI)

    Hall, W.C.

    1985-09-01

    This report describes the experiments performed to measure the energy spectrum of neutrons released in certain atomic-weapons tests in Operation Greenhouse. The measurements were made of two types: (1) the time-of-flight measurements designed to establish the fission neutron spectrum down to about 3 MeV energy, and (2) the so-called Tenex (Temperature-Neutron Experiment) measurements designed to obtain the velocity distribution of neutrons produced by the deuterium-tritium fusion reactions.

  8. Energy Management Practices at Dalls/Fort Worth International Airport 

    E-Print Network [OSTI]

    Dennis, J. R.

    2013-01-01

    ? Energy & Utilities Services Business Unit ? Energy Management Section ? Energy Manager ? Energy Engineer ? Energy Analyst ? Designer (CADD and GIS Support) ? Electrical Supervisor (27 employees) ? SEAMS Scheduler Energy Management Mission..., October 9, 2013 Supply-Side Management (cont.) ? Environmental Stewardship ? Electricity ? Onsite Renewable ? Wind ? Economically, geographically and operationally not practical ? Solar ? Economically not practical unless heavily subsidized...

  9. High Performance Class-AB Output Stage Operational Amplifiers for Continuous-time Sigma-delta ADC 

    E-Print Network [OSTI]

    Krishnan, Lakshminarasimhan

    2012-10-19

    One of the most critical blocks in a wide-band continuous time sigma delta (CTSD) analog-to-digital converter (ADC) is the loop filter. For most loop filter topologies, the performance of the filter depends largely on the performance...

  10. Real-time operating mode with DSSSD detector to search for short correlation ER-alpha chains

    E-Print Network [OSTI]

    Tsyganov, Yury

    2015-01-01

    Real-time PC based algorithm is developed for DSSSD detector. Complete fusion nuclear reaction natYb+48Ca->217Th is used to test this algorithm at 48Ca beam. Example of successful application of a former algorithm for resistive strip PIPS detector in 249Bk+48Ca nuclear reaction is presented too. Case of alpha-alpha correlations is also under brief consideration.

  11. Unmanned Aerial Vehicle (UAV) Dynamic-Tracking Directional Wireless Antennas for Low Powered Applications that Require Reliable Extended Range Operations in Time Critical Scenarios

    SciTech Connect (OSTI)

    Scott G. Bauer; Matthew O. Anderson; James R. Hanneman

    2005-10-01

    The proven value of DOD Unmanned Aerial Vehicles (UAVs) will ultimately transition to National and Homeland Security missions that require real-time aerial surveillance, situation awareness, force protection, and sensor placement. Public services first responders who routinely risk personal safety to assess and report a situation for emergency actions will likely be the first to benefit from these new unmanned technologies. ‘Packable’ or ‘Portable’ small class UAVs will be particularly useful to the first responder. They require the least amount of training, no fixed infrastructure, and are capable of being launched and recovered from the point of emergency. All UAVs require wireless communication technologies for real- time applications. Typically on a small UAV, a low bandwidth telemetry link is required for command and control (C2), and systems health monitoring. If the UAV is equipped with a real-time Electro-Optical or Infrared (EO/Ir) video camera payload, a dedicated high bandwidth analog/digital link is usually required for reliable high-resolution imagery. In most cases, both the wireless telemetry and real-time video links will be integrated into the UAV with unity gain omni-directional antennas. With limited on-board power and payload capacity, a small UAV will be limited with the amount of radio-frequency (RF) energy it transmits to the users. Therefore, ‘packable’ and ‘portable’ UAVs will have limited useful operational ranges for first responders. This paper will discuss the limitations of small UAV wireless communications. The discussion will present an approach of utilizing a dynamic ground based real-time tracking high gain directional antenna to provide extend range stand-off operation, potential RF channel reuse, and assured telemetry and data communications from low-powered UAV deployed wireless assets.

  12. Operation Greenhouse. Scientific Director's report of atomic weapon tests at Eniwetok, 1951. Annex 8. 2B. Interferometer gauge pressure-time measurements

    SciTech Connect (OSTI)

    Kirk, J.E.; Seacord, D.F.; Newman, R.W.

    1985-04-01

    This project was charged with the responsibility of conducting tests on static aircraft panels mounted on the ground at various ranges from the blast. Pressure-versus-time data were obtained using interferometer gauges. The gauge proved to be reliable and easy to operate. Its high-frequency response enabled it to record data to the pressure rise at the front of the blast wave which had not been noted previously. These results show, from measurements taken by pressure instruments mounted flush with the ground, that the rise times at the front of the blast waves were on gamma-radiation intensity by the smple expedient of stacking a few layers of lead breic around the gauge mounts.

  13. Low-altitude atmospheric turbulence around an airport 

    E-Print Network [OSTI]

    Cass, Stanley Dale

    1972-01-01

    speed and the average wind speed computed over an entire run (approximately 1 hr). iv Profiles of wind speed were approximately logarithmic, but profiles of turbulent energy showed a large increase in the wake of large obstructions. Spectra of wind... from u 30-sec averages 56 57 28 Spectra of accelerometer and wind data for same period 59 LIST OF SYMBOLS Symbol Definition Exchange coefficient for momentum Height Time Kinetic energy Average kinetic energy of turbulence u' + v'2 + w' (' 2...

  14. EA-2000: Proposed Land Transfer to Develop a General Aviation Airport at the East Tennessee Technology Park Heritage Center, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    DOE is preparing an EA to assess potential environmental impacts of the proposed land transfer to the Metropolitan Knoxville Airport Authority for the development of a general aviation airport at the East Tennessee Technology Park Heritage Center, in Oak Ridge, Tennessee.

  15. Geochemical information for sites contaminated with low-level radioactive wastes: II. St. Louis Airport Storage Site

    SciTech Connect (OSTI)

    Seeley, F.G.; Kelmers, A.D.

    1985-01-01

    The St. Louis Airport Storage Site (SLASS) became radioactively contaminated as a result of wastes that were being stored from operations to recover uranium from pitchblende ores in the 1940s and 1950s. The US Department of Energy is considering various remedial action options for the SLASS under the Formerly Utilized Site Remedial Action Program (FUSRAP). This report describes the results of geochemical investigations, carried out to support the FUSRAP activities and to aid in quantifying various remedial action options. Soil and groundwater samples from the site were characterized, and sorption ratios for uranium and radium and apparent concentration limit values for uranium were measured in soil/groundwater systems by batch contact methodology. The uranium and radium concentrations in soil samples were significantly above background near the old contaminated surface horizon (now at the 0.3/sup -/ to 0.9/sup -/m depth); the maximum values were 1566 ..mu..g/g and 101 pCi/g, respectively. Below about the 6/sup -/m depth, the concentrations appeared to be typical of those naturally present in soils of this area (3.8 +- 1.2 ..mu..g/g and 3.1 +- 0.6 pCi/g). Uranium sorption ratios showed stratigraphic trends but were generally moderate to high (100 to 1000 L/kg). The sorption isotherm suggested an apparent uranium concentration limit of about 200 mg/L. This relatively high solubility can probably be correlated with the carbonate content of the soil/groundwater systems. The lower sorption ratio values obtained from the sorption isotherm may have resulted from changes in the experimental procedure or the groundwater used. The SLASS appears to exhibit generally favorable behavior for the retardation of uranium solubilized from waste in the site. Parametric tests were conducted to estimate the sensitivity of uranium sorption and solubility to the pH and carbonate content of the system.

  16. 4.5 years multi-wavelength observations of Mrk 421 during the ARGO-YBJ and Fermi common operation time

    E-Print Network [OSTI]

    Bartoli, B; Bi, X J; Cao, Z; Catalanotti, S; Chen, S Z; Chen, T L; Cui, S W; Dai, B Z; Damone, A; Danzengluobu,; De Mitri, I; Piazzoli, B D Ettorre; Di Girolamo, T; Di Sciascio, G; Feng, C F; Feng, Zhaoyang; Feng, Zhenyong; Gou, Q B; Guo, Y Q; He, H H; Hu, Haibing; Hu, Hongbo; Iacovacci, M; Iuppa, R; Jia, H Y; Labaciren,; Li, H J; Liu, C; Liu, J; Liu, M Y; Lu, H; Ma, L L; Ma, X H; Mancarella, G; Mari, S M; Marsella, G; Mastroianni, S; Montini, P; Ning, C C; Perrone, L; Pistilli, P; Salvini, P; Santonico, R; Shen, P R; Sheng, X D; Shi, F; Surdo, A; Tan, Y H; Vallania, P; Vernetto, S; Vigorito, C; Wang, H; Wu, C Y; Wu, H R; Xue, L; Yang, Q Y; Yang, X C; Yao, Z G; Yuan, A F; Zha, M; Zhang, H M; Zhang, L; Zhang, X Y; Zhang, Y; Zhao, J; Zhaxiciren,; Zhaxisangzhu,; Zhou, X X; Zhu, F R; Zhu, Q Q

    2015-01-01

    We report on the extensive multi-wavelength observations of the blazar Markarian 421 (Mrk 421) covering radio to gamma-rays, during the 4.5 year period of ARGO-YBJ and Fermi common operation time, from August 2008 to February 2013. In particular, thanks to the ARGO-YBJ and Fermi data, the whole energy range from 100 MeV to 10 TeV is covered without any gap. In the observation period, Mrk 421 showed both low and high activity states at all wavebands. The correlations among flux variations in different wavebands were analyzed. Seven large flares, including five X-ray flares and two GeV gamma-ray flares with variable durations (3-58 days), and one X-ray outburst phase were identified and used to investigate the variation of the spectral energy distribution with respect to a relative quiescent phase. During the outburst phase and the seven flaring episodes, the peak energy in X-rays is observed to increase from sub-keV to few keV. The TeV gamma-ray flux increases up to 0.9-7.2 times the flux of the Crab Nebula. T...

  17. DFW Airport 

    E-Print Network [OSTI]

    Dennis, J. R.

    2011-01-01

    ? Rents ~2 million cars per year ? Total electric ? 7.7 million kWh annually 10 Continuous Commissioning? - Consolidated Rent-A-Car Center CC? Assessment/Implementation ? Excessive outside air ? Duct static pressure too high ? Economizer cycle... at t H o u rs (K W H ) RAC Electric Consumption Over $767,000 in Total Savings 18% reduction in annual average kWh 11 Continuous Commissioning? - Consolidated Rent-A-Car Center Results of CC Project 12 Continuous Commissioning...

  18. Operated device estimation framework 

    E-Print Network [OSTI]

    Rengarajan, Janarthanan

    2009-05-15

    time on recloser slow curve Tl Point on the maximum equivalent lockout curve of recloser TRj Maximum clearing time at the chosen current for the jth operation TC Total Clearing TCC Time Current Characteristic V Volts / Voltage viii TABLE... to trip open. Sectionalizer setting should be one less than lockout setting of upstream protective device. The third factor is that sectionalizer?s memory time must be no longer than the cumulative tripping and reclosing time intervals of the upstream...

  19. Microsoft PowerPoint - To NETL Albany Site from Eugene, Oregon Airport Directions.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines light on darkMicroorganismsnowReport ARM28 MarchEugene, Oregon Airport 1.

  20. Microsoft PowerPoint - To NETL Albany Site from Portland, Oregon Airport (PDX) Directions.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines light on darkMicroorganismsnowReport ARM28 MarchEugene, Oregon Airport

  1. Operation Greenhouse. Scientific Director's report of atomic-weapon tests at Eniwetok, 1951. Annex 1. 11. Timing and firing and fiducial markers

    SciTech Connect (OSTI)

    Grier, H.E.

    1985-09-01

    An automatic remote-control system armed and fired the bomb and sent out a sequence of time signals to experimental equipment on the atoll. A central station at Parry Island sent signals via submarine cables to a timer station on a shot island. The timer station controlled signals to the zero station and to experiments on the island, and through auxiliary stations, it also controlled signal distribution on adjacent islands. Light-sensitive triggering units for apparatus and for accurate standard zero-time reference were provided in the form of Blue Boxes, or fiducial markers.

  2. Operation Greenhouse. Scientific Director's report of atomic weapon tests at Eniwetok, 1951. Annex 1. 1. Prompt-gamma-ray measurements. Part 2. Prompt-gamma-ray intensity as a function of time

    SciTech Connect (OSTI)

    Hall, W.C.

    1985-09-01

    This report describes the procedure followed and the results obtained in measuring, as a function of time, the prompt gamma radiation emitted within 1,000 seconds after the explosion of the atomic weapons studies in Operation Greenhouse. The design of the experiment and a description of the equipment are given. The fast coaxial scintillation detectors for the Greenhouse test were used without collimators at a distance of several mean free paths from the source. Numerous factors complicated the interpretation of the data obtained, thus reducing the accuracy that may be ascribed to the results. The probable peak gamma-ray intensity, the time of occurrence of the peak, and the prompt-gamma decay curves as a function of time were obtained for each shot. A composite decay curve fitting all the shots was obtained, and from this, a scaling factor was deduced which related the shot energy to the gamma-ray intensity.

  3. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  4. Operation Greenhouse. Scientific Director's report of atomic-weapon tests at Eniwetok, 1951. Annex 1. 6. Blast measurements. Part 4. Pressure-time measurements in the Mach region. Sections 1 and 2

    SciTech Connect (OSTI)

    Price, J.F.; Sokol, G.M.; Anastasion, S.N.; Vader, R.L.; Walthall, E.R.

    1985-09-01

    The objective of the laboratory and field work described in this report was to make accurate measurements of air blast in the Mach region from two explosions of Operation Greenhouse. Measurements were made at constant height along a single radius on Test Dog and along two different radii for test Easy. In addition, diaphragm-type inductance gages were installed at five different heights on approximately the same radii on test Easy. The spring-piston gage successfully did the job it was designed to do. The diaphragm-type inductance-gage measuring system had an accuracy of 2% in pressure and a resolving time of approximately 1 musec. Complete details concerning equipment design, field operation, and recommendations for future use of the systems are presented.

  5. Tell President Obama About Coal River Mountain Coal River Mountain and the Heathrow Airport runway remind me how important it is to

    E-Print Network [OSTI]

    Hansen, James E.

    Tell President Obama About Coal River Mountain Coal River Mountain and the Heathrow Airport runway remind me how important it is to keep our eye on the ball. Coal River Mountain is the site of an absurdity. I learned about Coal River Mountain from students at Virginia Tech last fall. They were concerned

  6. Airport Modern: The Space between International Departures and Arrivals in Modern Korean National Imaginings

    E-Print Network [OSTI]

    Kim, Alice S.

    2013-01-01

    Times, 2007] Figure 49: Taekwondo Demonstration [1988 Seoulmasks from 60 countries, a Taekwondo demonstration (which atKorea Times, 2007] Figure 49: Taekwondo Demonstration [Open

  7. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  8. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  9. <...

  10. Matrix product operator representations

    E-Print Network [OSTI]

    V. Murg; J. I. Cirac; B. Pirvu; F. Verstraete

    2008-04-24

    We show how to construct relevant families of matrix product operators in one and higher dimensions. Those form the building blocks for the numerical simulation methods based on matrix product states and projected entangled pair states. In particular, we construct translational invariant matrix product operators suitable for time evolution, and show how such descriptions are possible for Hamiltonians with long-range interactions. We illustrate how those tools can be exploited for constructing new algorithms for simulating quantum spin systems.

  11. Path Integral for Quantum Operations

    E-Print Network [OSTI]

    Vasily E. Tarasov

    2007-06-14

    In this paper we consider a phase space path integral for general time-dependent quantum operations, not necessarily unitary. We obtain the path integral for a completely positive quantum operation satisfied Lindblad equation (quantum Markovian master equation). We consider the path integral for quantum operation with a simple infinitesimal generator.

  12. Operations Research: The Value Proposition

    E-Print Network [OSTI]

    Brock, David

    Operations Research: The Value Proposition QuickTimeTM and a TIFF (Uncompressed) decompressor from MIT http://www.photo.net/photo/ pcd4229/boston-skyline-6.4.jpg #12;Operations Research, co · STATE OF THE PROFESSION. How INFORMS is emphasizing this aspect of Operations Research (OR), using

  13. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  14. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    its interest in monitoring  critical paths via PMUs.   The of-concept for existing critical paths with Phasors. Supportphasors (SDG&E) • Critical path monitoring using phasors (

  15. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    Analysis”, Electrical Power and Energy Systems, 22 (2000), systems, Electrical Energy  & Power Systems, Vol.  17, No.  of Electric Power Systems Using  Energy Functions: Theory, 

  16. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    and Data Acquisition (SCADA) data and off?line model?based California ISO’s current SCADA/Energy Management System  (Monitoring System  RTSO  RTVSA  SCADA/EMS  SCE  SDG&E  TRP 

  17. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    Mittelstadt (Bonneville Power Administration) Prof. YixinW. Taylor (Bonneville Power Administration) Prof. H. -D.Mittelstadt (Bonneville Power Administration) Prof. Yixin

  18. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    Energy Research Program Prepared By: Lawrence Berkeley National LaboratoryEnergy Research Program Prepared By: Lawrence Berkeley National LaboratoryEnergy Research Program Prepared By: Lawrence Berkeley National Laboratory

  19. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    Adaptive AR Model Based on PMU,” IEEE/PES Transmission and phasor measurement unit (PMU)  measurements to improve the by incorporating PG&E’s PMU  measurements into the network 

  20. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    current SCADA/Energy Management System  (EMS); in the long California ISO?s energy  management system).  The project the California ISO’s Energy Management System (EMS).    The 

  21. REAL TIME SYSTEM OPERATIONS 2006-2007

    E-Print Network [OSTI]

    Eto, Joseph H.

    2008-01-01

    and Southern Greece Blackout of July 12, 2004”.   Available Reasons of the East Coast US Blackout on August 14,  2003”, Was Possible to Avoid the Blackout”, Power Market, No.  1, 

  22. Travel and Accommodations: Students will make their own travel arrangement and should plan flights to arrive on May 9th and leave on June 3rd.Students can take a taxi to the 92nd St. Y from the airport.The closest airport in LaGuardia.We will live and mee

    E-Print Network [OSTI]

    Bordenstein, Seth

    to arrive on May 9th and leave on June 3rd.Students can take a taxi to the 92nd St. Y from the airport for an optional fee. a contemporary art blitz - May 9th thru June 3rd, 2011 Course Description: This course week. Program Dates: May 9th ­ June 3rd 2011 Daily schedule to be announced. Contact: diane

  1. developing more effective X-ray detector systems for airport security;

    E-Print Network [OSTI]

    Laboratory STFC has also responded to the National Security Strategy by establishing the initial operating developments to meet current and future challenges. It includes a high energy X-ray imaging facility capable in Oxfordshire, or at STFC's UK Astronomy Technology Centre in Edinburgh. The SFL is available to scientists

  2. Public health assessment for St. Louis Airport, Hazelwood Interim Storage/Futura Coatings Company, St. Louis, St. Louis County, Missouri, Region 7. Cerclis No. MOD980633176. Preliminary report

    SciTech Connect (OSTI)

    Not Available

    1994-01-20

    The St. Louis Airport/Hazelwood Iterim Storage/Futura Coatings Company, a National Priorities List site, is in St. Louis County, Missouri. From 1946 to 1973, the site was used to store radioactive materials resulting from uranium processing. High levels of uranium, thorium, radium, and radon were detected in soil, groundwater, and air. The site is still being used to store radioactive materials. The Agency for Toxic Substances and Disease Registry considers the St. Louis Airport site to be an indeterminate public health hazard. Although there are emissions of radon and the presence of thorium in on-site air and off-site soils and the emission of radiation resulting from the presence of these materials is not currently considered a health hazard. At present conditions, the concentration of radon off-site is indistinguishable from background levels. However, in the past, these contaminants may have been present at levels of health concern.

  3. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oak Ridge'sOPERATING

  4. Stirling machine operating experience

    SciTech Connect (OSTI)

    Ross, B.; Dudenhoefer, J.E.

    1994-09-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

  5. An investigation of the information needs of air passengers traveling to the airport 

    E-Print Network [OSTI]

    Burdette, Debra Arlene

    2000-01-01

    and thus would have adequate time to evaluate their options. Finally, based on the survey results, air passengers indicated they would prefer to use e-mail, pagers, telephones, and the Internet when making future travel information inquiries...

  6. Time in Quantum Mechanics

    E-Print Network [OSTI]

    Curt A. Moyer

    2013-05-23

    The failure of conventional quantum theory to recognize time as an observable and to admit time operators is addressed. Instead of focusing on the existence of a time operator for a given Hamiltonian, we emphasize the role of the Hamiltonian as the generator of translations in time to construct time states. Taken together, these states constitute what we call a timeline, or quantum history, that is adequate for the representation of any physical state of the system. Such timelines appear to exist even for the semi-bounded and discrete Hamiltonian systems ruled out by Pauli's theorem. However, the step from a timeline to a valid time operator requires additional assumptions that are not always met. Still, this approach illuminates the crucial issue surrounding the construction of time operators, and establishes quantum histories as legitimate alternatives to the familiar coordinate and momentum bases of standard quantum theory.

  7. Operation Poorman

    SciTech Connect (OSTI)

    Pruvost, N.; Tsitouras, J.

    1981-03-18

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

  8. Operations Research:Operations Research: The Science of BetterThe Science of Better

    E-Print Network [OSTI]

    Brock, David

    Operations Research:Operations Research: The Science of BetterThe Science of Better Richard C, Institute For Operations Research and the Management Sciences SmartWorld December 8, 2004 QuickTimeTM and a TIFF (Uncompressed) decompressor are needed to see this picture. #12;Operations Research:Operations

  9. Operations Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak ridge

  10. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak

  11. NO. REV. NO. Crew Systems & Operations

    E-Print Network [OSTI]

    Rathbun, Julie A.

    NO. REV. NO. : :- I ~ EASEP Crew Systems & Operations Analyses EATM-24 PAGE 1 OF DATE l/8 in this EATM are "EASEP Crew Systems and Operations Deployment Task/Time Sequence Analyses for LRRR & PSEP Systems Division EASEP Crew Systems & Operations Deployment Task/Time Sequence Analyses for LRRR & PSEP

  12. The concept of RunwayGuard was developed during techni-cal investigations at some airports in the Persian Gulf region

    E-Print Network [OSTI]

    Berlin,Technische Universität

    in the Persian Gulf region with the aim of increasing operational safety. Appropriate concept evaluation studies as real time transmission of this information to the controller's monitor. u Evaluation of controller (A-SMGCS). It is an intelligent tool consi- sting of sensors, processors, actuators, interfaces (to

  13. Formal Specification of Operating System Operations

    E-Print Network [OSTI]

    Black, Paul E.

    Formal Specification of Operating System Operations Dan Zhou Department of Computer Science.black@nist.gov This paper describes the development of a formal specification for a secure operating system architecture operations. We also provide a uniform environment for system commands that change the security state

  14. Dynamic Operational Risk Assessment with Bayesian Network 

    E-Print Network [OSTI]

    Barua, Shubharthi

    2012-10-19

    dependencies of equipment/components and timing of safety system operations, all of which are time dependent criteria that can influence dynamic processes. The conventional risk assessment methodologies can quantify dynamic changes in processes with limited...

  15. BATON ROUGE METRO AIRPORT

    E-Print Network [OSTI]

    Harms, Kyle E.

    STATE ID AND SURRENDER CERTIFICATE TO CASHIER ALONG WITH PARKING TICKET WHEN EXITING FROM LOT. PARKING WITH PARKING TICKET WHEN EXITING FROM LOT. PARKING SERVICES PROVIDED BY STANDARD PARKING, INC. 225-355-2978 Use STATE ID AND SURRENDER CERTIFICATE TO CASHIER ALONG WITH PARKING TICKET WHEN EXITING FROM LOT. PARKING

  16. Easterwood Airport - 15 

    E-Print Network [OSTI]

    Unknown

    2009-01-01

    175 200 225 250 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 0.2 Mean (mm) De p t h ( c m) Fig. 16. Mean grain size graph for core 4B 26 Fig. 17. Stratigraphic transect profile #1. % Sand Mean Size 27 In transect #1 in the north... 125 150 175 200 225 250 0.00 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 Mean (mm) Dep t h (cm) 25 26 Core: TXD-1D Particle Size Distribution 0.1 1 10 100 1000 Particle...

  17. La Guardia Airport Background

    E-Print Network [OSTI]

    , which was grandfathered in -- so most transcontinental and international flights use the area's other

  18. ILC Operating Scenarios

    E-Print Network [OSTI]

    T. Barklow; J. Brau; K. Fujii; J. Gao; J. List; N. Walker; K. Yokoya

    2015-06-25

    The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

  19. Design and operation of a setup with a camera and adjustable mirror to inspect the sense-wire planes of the Time Projection Chamber inside the MicroBooNE cryostat

    E-Print Network [OSTI]

    Benjamin Carls; Glenn Horton-Smith; Catherine C. James; Robert M. Kubinski; Stephen Pordes; Anne Schukraft; Thomas Strauss

    2015-08-26

    Detectors in particle physics, particularly when including cryogenic components, are often enclosed in vessels that do not provide any physical or visual access to the detectors themselves after installation. However, it can be desirable for experiments to visually investigate the inside of the vessel. The MicroBooNE cryostat hosts a TPC with sense-wire planes, which had to be inspected for damage such as breakage or sagging. This paper describes an approach to view the inside of the MicroBooNE cryostat with a setup of a camera and a mirror through one of its cryogenic service nozzles. The paper describes the camera and mirror chosen for the operation, the illumination, and the mechanical structure of the setup. It explains how the system was operated and demonstrates its performance.

  20. Design and Operation of A Setup with A Camera and Adjustable Mirror to Inspect the Sense-Wire Planes of the Time Projection Chamber Inside the MicroBooNE Cryostat

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Carls, Benjamin; Horton-Smith, Glenn; James, Catherine C.; Kubinski, Robert M.; Pordes, Stephen; Schukraft, Anne; Strauss, Thomas

    2015-08-26

    Detectors in particle physics, particularly when including cryogenic components, are often enclosed in vessels that do not provide any physical or visual access to the detectors themselves after installation. However, it can be desirable for experiments to visually investigate the inside of the vessel. The MicroBooNE cryostat hosts a TPC with sense-wire planes, which had to be inspected for damage such as breakage or sagging. This inspection was performed after the transportation of the vessel with the enclosed detector to its final location, but before filling with liquid argon. Our paper describes an approach to view the inside of themore »MicroBooNE cryostat with a setup of a camera and a mirror through one of its cryogenic service nozzles. The paper also describes the camera and mirror chosen for the operation, the illumination, and the mechanical structure of the setup. It explains how the system was operated and demonstrates its performance.« less

  1. Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1985-04-01

    The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

  2. Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems 

    E-Print Network [OSTI]

    Liu, C.; Bruner, H. L.; Deng, S.; Brundidge, T.; Turner, W. D.; Claridge, D. E.

    2004-01-01

    , had some form of deteriorated controls, components, and operational function. For example, most of pneumatic controls were failed due to bad components, wrong settings, and disconnection before the Continuous CommissioningR (CCSM). This caused humid...

  3. Helpful Hints for Operating Schools 

    E-Print Network [OSTI]

    McClure, J. D.; Schreppler, S.; Cliver, R. E.

    2004-01-01

    operations program. This paper will discuss helpful hints that schools can use to maintain a proper building environment and save energy at the same time. Two case studies will also be included. The first is the TEAMS program, developed by Carrollton...

  4. Coiled tubing operations and services

    SciTech Connect (OSTI)

    Jaworsky, A.S. II )

    1991-11-01

    Coiled tubing offers many advantages over conventional jointed tubing used for drilling in oil fields, including time savings, pumping flexibility, fluid placement, reduced formation damage and safety. The article gives an overview of coiled tubing history and development. Operating concepts are explained, along with descriptions of the major equipment and components associated with coiled tubing use in the oil field today.

  5. Heat Transfer Operators Associated with Quantum Operations

    E-Print Network [OSTI]

    Ç. Aksak; S. Turgut

    2011-04-14

    Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

  6. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  7. Transportation System Concept of Operations

    SciTech Connect (OSTI)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level descriptions. of subsystems and components, and the Transportation System Requirements Document. Other program and system documents, plans, instructions, and detailed designs will be consistent with and informed by the Transportation System Concept of Operations. The Transportation System Concept of Operations is a living document, enduring throughout the OCRWM systems engineering lifecycle. It will undergo formal approval and controlled revisions as appropriate while the Transportation System matures. Revisions will take into account new policy decisions, new information available through system modeling, engineering investigations, technical analyses and tests, and the introduction of new technologies that can demonstrably improve system performance.

  8. Mission Operations & Data Systems

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Mission Operations & Data Systems The LASP Mission Operations & Data Systems (MO&DS) group staffs and instruments. Operational software acts like the health systems in a body, ensuring that temperature, energy. The software monitors the health of on-board systems; anything unusual is flagged and sent to mission operators

  9. Operations Research Giorgio Gallo

    E-Print Network [OSTI]

    Gallo, Giorgio

    Operations Research Giorgio Gallo Operations Research (OR) is defined, according to the International Fed- eration of Operational Research Societies, as a scientific approach to the solution are thus crucial to almost all aspects of OR, research and practice. Operations Research, the origins

  10. Building Operator Certification 

    E-Print Network [OSTI]

    Lilley, D.

    2013-01-01

    Certification Energy Efficiency through Operator Training CATEE December 18, 2013 – San Antonio, TX Dennis Lilley, CEM, PMP ESL-KT-13-12-49 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Building Operator Certification... Energy Efficiency through Operator Training What is Building Operator Certification? Industry-recognized credential in energy efficient building operation practices Created with 100 industry experts Launched in 1996 9,000 building engineers...

  11. Call for Papers Annals of Operations Research Subseries

    E-Print Network [OSTI]

    Call for Papers Annals of Operations Research Subseries: Operations Research in Medicine Computing in a timely manner, the Annals of Operations Research: Operations Research in Medicine subseries and exciting area. We seek original, high quality contributions that investigate theoretical or methodological

  12. Climate Data Operators (CDO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression,...

  13. SYMBOLS FOR TIME = time variable

    E-Print Network [OSTI]

    Duchowski, Andrew T.

    =forever) Cost spent to build variation point i at time i = index over variation points #12;SYMBOLS FOR TIME to account for net present value of money r = assumed interest rate i = index over variation points Cost Expected cost summed over all relevant time intervals Cost spent to build variation point i at time r

  14. SWPF Crane Lift Operation

    SciTech Connect (OSTI)

    None

    2010-01-01

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  15. Modelling Time

    E-Print Network [OSTI]

    Burra G. Sidharth

    2008-09-03

    We briefly review two concepts of time - the usual time associated with "being" and more recent ideas, answering to the description of "becoming". The approximation involved in the former is examined. Finally we argue that it is (unpredictable) fluctuations that underlie time.

  16. Determining collective barrier operation skew in a parallel computer

    DOE Patents [OSTI]

    Faraj, Daniel A.

    2015-12-24

    Determining collective barrier operation skew in a parallel computer that includes a number of compute nodes organized into an operational group includes: for each of the nodes until each node has been selected as a delayed node: selecting one of the nodes as a delayed node; entering, by each node other than the delayed node, a collective barrier operation; entering, after a delay by the delayed node, the collective barrier operation; receiving an exit signal from a root of the collective barrier operation; and measuring, for the delayed node, a barrier completion time. The barrier operation skew is calculated by: identifying, from the compute nodes' barrier completion times, a maximum barrier completion time and a minimum barrier completion time and calculating the barrier operation skew as the difference of the maximum and the minimum barrier completion time.

  17. RHIC Polarized proton operation

    SciTech Connect (OSTI)

    Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D'Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

    2011-03-28

    The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

  18. Quantum Time

    E-Print Network [OSTI]

    John Ashmead

    2010-05-05

    Normally we quantize along the space dimensions but treat time classically. But from relativity we expect a high level of symmetry between time and space. What happens if we quantize time using the same rules we use to quantize space? To do this, we generalize the paths in the Feynman path integral to include paths that vary in time as well as in space. We use Morlet wavelet decomposition to ensure convergence and normalization of the path integrals. We derive the Schr\\"odinger equation in four dimensions from the short time limit of the path integral expression. We verify that we recover standard quantum theory in the non-relativistic, semi-classical, and long time limits. Quantum time is an experiment factory: most foundational experiments in quantum mechanics can be modified in a way that makes them tests of quantum time. We look at single and double slits in time, scattering by time-varying electric and magnetic fields, and the Aharonov-Bohm effect in time.

  19. http://tti.tamu.edu > Variable message signs > Traffic actuated controllers > Traffic signals > Flashing traffic signals > Lane use control signals > Road markings > Rumble strips > Warrants (Traffic control devices) > Gro

    E-Print Network [OSTI]

    and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations > Aesthetics > Statistics > Transportation engineering >>> Mathematics > Simulation > Statistical analysis pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

  20. tti.tamu.edu > Variable message signs > Traffic actuated controllers > Traffic signals > Flashing traffic signals > Lane use control signals > Road markings > Rumble strips > Warrants (Traffic control devices) > Gro

    E-Print Network [OSTI]

    and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations > Statistics > Transportation engineering >>> Mathematics > Simulation > Statistical analysis > Backcalculation pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

  1. Operator ordering for generally covariant systems

    E-Print Network [OSTI]

    Rafael Ferraro; Daniel M. Sforza

    2000-10-06

    The constraint operators belonging to a generally covariant system are found out within the framework of the BRST formalism. The result embraces quadratic Hamiltonian constraints whose potential can be factorized as a never null function times a gauge invariant function. The building of the inner product between physical states is analyzed for systems featuring either intrinsic or extrinsic time.

  2. Cask fleet operations study

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  3. Sources of Operational Flexibility, Greening the Grid (Fact Sheet...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    costs are system-dependent and evolving over time SYSTEM OPERATION MARKETS LOAD FLEXIBLE GENERATION NETWORKS STORAGE Grid Codes Improved Energy Market Design Increased Ancillary...

  4. Spectral Operators of Matrices

    E-Print Network [OSTI]

    2014-01-10

    Jan 10, 2014 ... a thorough study on a new class of matrix valued functions, coined as spectral operators of ..... not self-adjoint. ...... 9 (1981) 1135–1151.

  5. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014...

  6. Operations Research Analyst

    Broader source: Energy.gov [DOE]

    This position is located in Power Services of the Bonneville Power Administration. The purpose of this position is to serve as a developmental operations research analyst responsible for...

  7. Operations Committee Report

    Broader source: Energy.gov (indexed) [DOE]

    to the Commission to Review Effectiveness of National Energy Laboratories Jeff Smith Deputy for Operations Oak Ridge National Laboratory February 24, 2015 The Importance...

  8. Bevalac Operations, 1991

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This report discusses the following aspects of the Bevalac: Accelerator Technology and Operations Summary; Support for Space Exploration; Nuclear Science Research; and Biomedical Research.

  9. Bevalac Operations, 1989

    SciTech Connect (OSTI)

    Not Available

    1990-06-01

    This report discusses the following topics in relation to the Bevalac accelerator: accelerator technology operations summary; nuclear science; biomedical research; and publications and presentations.

  10. STARBASE: MANAGING CONTENTION AND TIMING

    E-Print Network [OSTI]

    Son, Sang H.

    systems (RT­DBMS) has primarily based on simulation. This chapter discusses how current real­time technology has been applied to architect an actual RT­DBMS on a real­time microkernel operating system. A real RT­DBMS must confront many practical issues which simulations typically ignore: race conditions

  11. Kodama time

    E-Print Network [OSTI]

    Abreu, Gabriel

    2010-01-01

    In a general time-dependent (3+1)-dimensional spherically symmetric spacetime, the so-called Kodama vector is a naturally defined geometric quantity that is timelike outside the evolving horizon and so defines a preferred class of fiducial observers. However the Kodama vector does not by itself define any preferred notion of time. We demonstrate that a preferred time coordinate - which we shall call Kodama time - can be introduced by taking the additional step of applying the Clebsch decomposition theorem to the Kodama vector. We thus construct a geometrically preferred coordinate system for any time-dependent spherically symmetric spacetime, and explore its properties. In particular we use this formalism to construct a general class of conservation laws, generalizing Kodama's energy flux. We study the geometrically preferred fiducial observers, and demonstrate that it is possible to define and calculate a generalized notion of surface gravity that is valid throughout the entire evolving spacetime. Furthermor...

  12. Holographic thermalization of charged operators

    E-Print Network [OSTI]

    Alejandro Giordano; Nicolas E. Grandi; Guillermo A. Silva

    2014-12-26

    We study a light-like charged collapsing shell in AdS-Reissner-Nordstrom spacetime, investigating whether the corresponding Vaidya metric is supported by matter that satisfies the null energy condition. We find that, if the absolute value of the charge decreases during the collapse, energy conditions are fulfilled everywhere in spacetime. On the other hand, if the absolute value of the charge increases, the metric does not satisfy energy conditions in the IR region. Therefore, from the gauge/gravity perspective, this last case is only useful to study the thermalization of the UV degrees of freedom. For all these geometries, we probe the thermalization process with two point correlators of charged operators, finding that the thermalization time grows with the charge of the operator, as well as with the dimension of space.

  13. Steps to Establish a Real-Time Transmission Monitoring System...

    Energy Savers [EERE]

    Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to Establish a Real-Time...

  14. Improved Boiler System Operation with Real-time Chemical Control 

    E-Print Network [OSTI]

    Bloom, D.; Jenkins, B.

    2010-01-01

    The steam boiler system is a critical component of most manufacturing processes. Steam production reliability is often a key component in product quality and overall production efficiency. Hourly steam load demands can swing by as much as 500...

  15. Heavy ion beam probe operation in time va

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverse (Journalvivo Low-DoseOptions for AccidentalHealth,HeatState

  16. human spaceflight and operations

    E-Print Network [OSTI]

    Anand, Mahesh

    1 human spaceflight and operations Lunar Lander human spaceflight and operations #12;2 human cooperation in exploration prim ary objective opportunity for investigations #12;3 human spaceflight No RHUs LANDING SITE South Polar Reliant on Solar Power generation + conventional thermal control LAUNCHER

  17. Emergency Evacuation Operations Plan

    E-Print Network [OSTI]

    Eberhard, Marc O.

    Emergency Evacuation Operations Plan Civil and Environmental Engineering More Hall 2015 #12;1 Introduction Environmental Health and Safety (EH&S) developed this model Emergency Evacuation and Operations Plan (EEOP) to assist departments in preparing for building emergencies as expected and required

  18. Semantics for algebraic operations 

    E-Print Network [OSTI]

    Plotkin, Gordon; Power, John

    2003-01-01

    Given a category C with finite products and a strong monad T on C, we investigate axioms under which an ObC-indexed family of operations of the form ?_x : (Tx)n ! Tx provides a definitive semantics for algebraic operations ...

  19. From US NAVY Mate to Division Leader for Operations - Requirements, Development and Career Paths of LANL/LANSCE Accelerator Operators

    SciTech Connect (OSTI)

    Spickermann, Thomas [Los Alamos National Laboratory

    2012-07-26

    There are opportunities for advancement within the team. Operators advance by: (1) Becoming fully qualified - following the LANSCE Accelerator Operator Training Manual, Operator trainees go through 5 levels of qualification, from Radiation Security System to Experimental Area Operator. Must obtain Knowledge and Performance checkouts by an OSS or AOSS, and an End-of-Card checkout by the team leader or RSS engineer (level I). Program was inspired by US NAVY qualification program for nuclear reactor operators. Time to complete: 2-2.5 years. (2) Fully qualified operators are eligible to apply for vacant (OSS)/AOSS positions; and (3) Alternatively, experienced operators can sign up for the voluntary Senior Operator Qualification Program. They must demonstrate in-depth knowledge of all areas of the accelerator complex. Time to complete is 2-3 years (Minimum 4 years from fully qualified). Eligible for promotion to level between qualified operator and AOSS.

  20. Quantum time

    E-Print Network [OSTI]

    Giovannetti, Vittorio

    We give a consistent quantum description of time, based on Page and Wootters’s conditional probabilities mechanism, which overcomes the criticisms that were raised against similar previous proposals. In particular we show ...

  1. Chow Time 

    E-Print Network [OSTI]

    Unknown

    2011-09-05

    -1 THE PREDICTION OF BUS ARRIVAL TIME USING AUTOMATIC VEHICLE LOCATION SYSTEMS DATA A Dissertation by RAN HEE JEONG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree... of DOCTOR OF PHILOSOPHY December 2004 Major Subject: Civil Engineering THE PREDICTION OF BUS ARRIVAL TIME USING AUTOMATIC VEHICLE LOCATION SYSTEMS DATA A Dissertation by RAN HEE JEONG Submitted to Texas A...

  2. MANAGING OPERATIONS AND SERVICES (10061, MGTK 511-110)

    E-Print Network [OSTI]

    Diestel, Geoff

    -based competition, and quality improvement. Operations management involves the integration of numerous activities1 MANAGING OPERATIONS AND SERVICES (10061, MGTK 511-110) SYLLABUS, SPRING 2015 MEETING TIME, cost or quality. Most now agree that world class performance in operations is essential for competitive

  3. PRODUCTION AND OPERATIONS MANAGEMENT (80552, MGTK 421-125)

    E-Print Network [OSTI]

    Diestel, Geoff

    1 PRODUCTION AND OPERATIONS MANAGEMENT (80552, MGTK 421-125) SYLLABUS, FALL 2014 MEETING TIME DESCRIPTION AND OVERVIEW: Operations management involves the integration of numerous activities and processes or quality. Most now agree that world class performance in operations is essential for competitive success

  4. PRODUCTION AND OPERATIONS MANAGEMENT (10048, MGTK 421-110)

    E-Print Network [OSTI]

    Diestel, Geoff

    1 PRODUCTION AND OPERATIONS MANAGEMENT (10048, MGTK 421-110) SYLLABUS, SPRING 2015 MEETING TIME DESCRIPTION AND OVERVIEW: Operations management involves the integration of numerous activities and processes or quality. Most now agree that world class performance in operations is essential for competitive success

  5. A Human Performance Modeling System for Process Safety Operations 

    E-Print Network [OSTI]

    Harputlu, Emrah 1986-

    2013-01-02

    Operators have a crucial role in case of an emergency in a process facility. When an abnormality occurs in the process, the operator has a limited time to take corrective actions before system safety devices shut down the operation. It is crucial...

  6. CH Packaging Operations Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-06-13

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  7. Nuclear material operations manual

    SciTech Connect (OSTI)

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  8. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-14

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  9. Reservoir Operation in Texas 

    E-Print Network [OSTI]

    Wurbs, Ralph A.

    1985-01-01

    to store and to release or withdraw for flood control and various conservation purposes. The report is intended to provide a comprehensive, indepth description of how reservoirs are operated in Texas...

  10. Continuity of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-14

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  11. Operation Research Society 

    E-Print Network [OSTI]

    Unknown

    2011-08-17

    vehicles made in going through the arterial and the total stops at each intersection, were also used. Two operational regions were identified in this research. It was found that none of the strategies provided significant improvement over the others...

  12. Operations Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-30

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  13. Supervisory Operations Research Analyst

    Broader source: Energy.gov [DOE]

    This position is located in Power Services Short-Term Planning(PGSP), Bonneville Power Administration. Short Term Planning provides hydraulic operations strategies to achieve power and non-power...

  14. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  15. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Admin Chg 2, dated 12-3-14, supersedes Admin Chg 1.

  16. The Dell operating model

    E-Print Network [OSTI]

    Paxton, Blaine Kermit

    2004-01-01

    Dell, Inc. is well known for its dramatic and continually improving operational performance in terms of unit cost, inventory level, production capacity, and labor efficiency. However, in late 2002, several members of Dell's ...

  17. Operating plan FY 1998

    SciTech Connect (OSTI)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  18. Cogeneration Operational Issues 

    E-Print Network [OSTI]

    Williams, M.

    1985-01-01

    important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation...

  19. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  20. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  1. Computing the Effects of Operator Attention Allocation in Human Control of Multiple Robots

    E-Print Network [OSTI]

    Crandall, Jacob W.

    In time-critical systems in which a human operator supervises multiple semiautomated tasks, failure of the operator to focus attention on high-priority tasks in a timely manner can lower the effectiveness of the system and ...

  2. Real time display of VEGAS data for Observers, Oper-ators and Engineers

    E-Print Network [OSTI]

    Groppi, Christopher

    Power splitter and amplifier 1PPS S/W sig i/p S/W sig o/p Switching signal distribution To ROAC spectrometer. This display format ­ 2D display of frequency/channel vs power spectral density ­ can be enhanced the data streaming system. Thus the design of the data streaming system should take into account

  3. Airports of the Future: The Development of Airport Systems

    E-Print Network [OSTI]

    and scope. This is the model for most successful manufacturers and service providers, such as Walmart

  4. Airport sustainability encompasses a wide variety of airport management and

    E-Print Network [OSTI]

    Minnesota, University of

    is to consider renewable energies. Solar photovoltaic (PV), which uses panels to absorb solar energy, is prob- ably the most commonly implemented type of renewable energy. Solar PV panels can be ground a cold winter climate, the efficiency of solar PV is high in Minnesota because of its many sunny days

  5. Hong Kong InternationalHong Kong International AirportAirport

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    recyclingrecycling Mechanized food waste compostersMechanized food waste compostersMechanized food waste compostersMechanized food waste composters which reduce waste volume by up towhich reduce waste volume by up to 90

  6. About APPLE II Operation

    SciTech Connect (OSTI)

    Schmidt, T.; Zimoch, D.

    2007-01-19

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  7. Chapter 10: FTU Operation

    SciTech Connect (OSTI)

    Angelini, B.M.; Apicella, M.L.; Buceti, G.; Centioli, C.; Crisanti, F.; Iannone, F.; Mazza, G.; Mazzitelli, G.; Panella, M.; Vitale, V.

    2004-05-15

    Some specific points of the Frascati Tokamak Upgrade (FTU) operation are presented for plasma performance as well as for the machine availability and the development of new tools needed to operate in a complex scenario needed for tokamak research. The different techniques adopted for wall conditioning of the FTU are reviewed. Plasmas with low Z{sub eff} have been achieved including those at low density and high additional heating power. The obtained experimental results are discussed in terms of better operation and plasma performance achieved. As with any other large - and thus long-lasting - experiments, a mixture of old and new technological solutions inserted in an open source framework characterizes the FTU data control and acquisition systems. We give some information on the original architecture and try to detail its current state. The high level of reliability presently achieved is discussed.

  8. Naturalistic Decision Making For Power System Operators

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2009-06-23

    Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

  9. Remote Operations for LHC and CMS

    SciTech Connect (OSTI)

    Gottschalk, E.E.; /Fermilab

    2007-04-01

    Commissioning the Large Hadron Collider (LHC) and its experiments will be a vital part of the worldwide high energy physics program beginning in 2007. A remote operations center has been built at Fermilab to contribute to commissioning and operations of the LHC and the Compact Muon Solenoid (CMS) experiment, and to develop new capabilities for real-time data analysis and monitoring for LHC, CMS, and grid computing. Remote operations will also be essential to a future International Linear Collider with its multiple, internationally distributed control rooms. In this paper we present an overview of Fermilab's LHC@FNAL remote operations center for LHC and CMS, describe what led up to the development of the center, and describe noteworthy features of the center.

  10. Commitments to Regulate Social Web Services Operation

    E-Print Network [OSTI]

    Sheng, Michael

    Commitments to Regulate Social Web Services Operation Zakaria Maamar, Noura Faci, Khouloud Boukadi, Quan Z. Sheng, Member, IEEE, and Lina Yao Abstract--This paper discusses how social Web services are held responsible for the actions they take at run time. Compared to (regular) Web services, social Web

  11. The Selfish Goal: Autonomously operating motivational structures

    E-Print Network [OSTI]

    Bargh, John A.

    , CT 06520 john.bargh@yale.edu www.yale.edu/acmelab Abstract: We propose the Selfish Goal model, which behavior, at times in contradictory directions. Goals can operate both consciously and unconsciously from unconscious and selfish forms of pursuit. This theoretical framework predicts the existence

  12. Copyright 2005 POSC Intelligent Oilfield Operations

    E-Print Network [OSTI]

    Brock, David

    Copyright © 2005 POSC WITSMLTM and Intelligent Oilfield Operations David Archer MIT Data Center M-Alliance POSC Source: Downes & Mui, "Unleashing the Killer App" #12;Oil fields of the future: real-time oil, London Members + SIG Members: > 80 Oil BP, ChevronTexaco, ExxonMobil, Hydro, ONGC, Pioneer, Shell

  13. Estimating the likelihood of weather criteria exceedance during marine operations

    SciTech Connect (OSTI)

    Brabazon, P.G. [Four Elements Ltd., London (United Kingdom); Gudmestad, O.T. [Statoil, Stavanger (Norway); Hopkins, J.S.

    1996-12-31

    This paper describes an approach to estimating the probability of marine operations being exposed to unsafe weather conditions. Marine operations, both inshore and offshore, are normally sensitive to environmental conditions. For the majority of operations threshold weather criteria will be predefined. An estimate of the likelihood of the operation experiencing bad weather, taking into account the uncertainties in weather forecasting, is of great value. The method is intended to be used as part of a risk assessment of marine operations, enabling the impact of design and scheduling decisions to be assessed in a structured and systematic way. The method has two components. Firstly, the time to complete an operation is defined in the form of a probability/time distribution. This is done by analyzing the duration of the tasks within the operation and identifying possible causes of delays. The likelihood and duration of each delay is estimated. Secondly, a probability/time curve is defined for the weather conditions exceeding the predefined threshold. The curve is determined by reference to the location of the marine operation, the time of year of the operation, the initial weather conditions and the accuracy of weather forecasting. Using the two probability/time curves, the likelihood of exposure is calculated.

  14. OPERATIONAL RISK RODNEY COLEMAN

    E-Print Network [OSTI]

    Coleman, Rodney

    the business environment. These include terrorism, civil unrest, systems fail- ings including hacking RISKS ARISING FROM BUSINESS ACTIVITY You lose business opportunities while your computer systems a business beyond those from its money-making activities. This is operational risk, often shortened to oprisk

  15. Concept of Operations: Essence

    SciTech Connect (OSTI)

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  16. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Demazière, Christophe

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed of Reactor Physics SE-41296 Gothenburg, Sweden GABOR PÓR Budapest University of Technology and Economics H

  17. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics, localization algorithm LOCALIZATION OF A VIBRATING CONTROL ROD PIN IN PRESSURIZED WATER REACTORS USING. The possibility of the localization of a vibrating control rod pin in a pressurized water reactor control assembly

  18. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper- ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed of Reactor Physics SE-41296 Gothenburg, Sweden GABOR PÓR Budapest University of Technology and Economics H

  19. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, dated 6-25-13, cancels DOE O 422.1. Certified 12-3-14.

  20. Mathematical Jacobi Operators

    E-Print Network [OSTI]

    Teschl, Gerald

    -LATEX, PicTEX, and Makeindex. Version: November 7, 2012. Library of Congress Cataloging-in-Publication Data CIP Copying and reprinting. Individual readers of this publication, and nonprofit libraries acting-adjoint operators and develop discrete Weyl-Titchmarsh-Kodaira theory, covering all classical aspects like Weyl m-functions

  1. Perturbative Renormalization of Neutron-Antineutron Operators

    E-Print Network [OSTI]

    Buchoff, Michael I

    2015-01-01

    Two-loop anomalous dimensions and one-loop renormalization scheme matching factors are calculated for six-quark operators responsible for neutron-antineutron transitions. When combined with lattice QCD determinations of the matrix elements of these operators, our results can be used to reliably predict the neutron-antineutron vacuum transition time, $\\tau_{n\\bar{n}}$, in terms of basic parameters of baryon-number violating beyond-the-Standard-Model theories. The operators are classified by their chiral transformation properties, and a basis in which there is no operator mixing due to strong interactions is identified. Operator projectors that are required for non-perturbative renormalization of the corresponding lattice QCD six-quark operator matrix elements are constructed. A complete calculation of $\\delta m = 1/\\tau_{n\\bar{n}}$ in a particular beyond-the-Standard-Model theory is presented as an example to demonstrate how operator renormalization and results from lattice QCD are combined with experimental b...

  2. Theory of Operation

    E-Print Network [OSTI]

    ... Reasons: ; ______ ; ; The Heath distribution of UCSD PASCAL suffered some ; defects due to the hardware available at the time: ; ; 1) Limited disk capacity of ...

  3. built by airport authority for

    E-Print Network [OSTI]

    Ladkin, Peter B.

    on landing 3.1.1.3.1.1.3 low weight on each main gear wheel 3.1.1.3.1.1.1.3 condition of RWY surface 3 between consequences of design and behaviour expected by pilots 3.1.1.3.2.2 braking systems' logical design 3.1.1.3.2 speed brakes and thrust reverser deployment delayed 3.1.1.3 braking delayed 3

  4. Tevatron injection timing

    SciTech Connect (OSTI)

    Saritepe, S.; Annala, G.

    1993-06-01

    Bunched beam transfer from one accelerator to another requires coordination and synchronization of many ramped devices. During collider operation timing issues are more complicated since one has to switch from proton injection devices to antiproton injection devices. Proton and antiproton transfers are clearly distinct sequences since protons and antiprotons circulate in opposite directions in the Main Ring (MR) and in the Tevatron. The time bumps are different, the kicker firing delays are different, the kickers and lambertson magnets are different, etc. Antiprotons are too precious to be used for tuning purposes, therefore protons are transferred from the Tevatron back into the Main Ring, tracing the path of antiprotons backwards. This tuning operation is called ``reverse injection.`` Previously, the reverse injection was handled in one supercycle. One batch of uncoalesced bunches was injected into the Tevatron and ejected after 40 seconds. Then the orbit closure was performed in the MR. In the new scheme the lambertson magnets have to be moved and separator polarities have to be switched, activities that cannot be completed in one supercycle. Therefore, the reverse injection sequence was changed. This involved the redefinition of TVBS clock event $D8 as MRBS $D8 thus making it possible to inject 6 proton batches (or coalesced bunches) and eject them one at a time on command, performing orbit closure each time in the MR. Injection devices are clock event driven. The TCLK is used as the reference clock. Certain TCLK events are triggered by the MR beam synchronized clock (MRBS) events. Some delays are measured in terms of MRBS ticks and MR revolutions. See Appendix A for a brief description of the beam synchronized clocks.

  5. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  6. Chapter 1: Operating System Models 1 Operating System Models

    E-Print Network [OSTI]

    Melbourne, University of

    Chapter 1: Operating System Models 1 2 Operating System Models 2.1 Introduction Over the past several years, a number of trends affecting operating system design are witnessed and foremost among them is a move towards modularity. Operating systems such as Microsofts Windows, IBMs OS/2, C-DACs PARAS

  7. Rtrage zum Operations Research Kolloquium des Instituts fur Operations Research

    E-Print Network [OSTI]

    Stein, Oliver

    V O Rtr¨age zum Operations Research Kolloquium des Instituts f¨ur Operations Research Zeit conditions for their stability. Die Vortr¨age zum Operations Research wenden sich an alle Interessierten! Ab 17:00 Uhr ist am Institut f¨ur Operations Research (Geb¨aude 20.13, Raum 104) Gelegenheit zu einem

  8. Augmented reality building operations tool

    DOE Patents [OSTI]

    Brackney, Larry J.

    2014-09-09

    A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).

  9. Pressurized-fluid-operated engine

    SciTech Connect (OSTI)

    Holleyman, J.E.

    1990-01-30

    This patent describes a pressurized-fluid-operated reciprocating engine for providing output power by use of a pressurized gas that expands within the engine without combustion. It comprises: an engine block having a plurality of cylinders within which respective pistons are reciprocatable to provide a rotary power output; gas inlet means connected with the engine block for introducing a pressurized gas into the respective cylinders in a predetermined, timed relationship to provide a smooth power output from the engine; gas outlet means connected with the engine block for conveying exhaust gas from the respective cylinders after the gas expanded to move the pistons within the cylinders; and recirculation means extending between the inlet means and the outlet means for recirculation a predetermined quantity of exhaust gas. The recirculation means including ejector means for drawing exhaust gas into the recirculation means.

  10. Coiled tubing - Operations and services

    SciTech Connect (OSTI)

    Gronseth, J.M. )

    1993-04-01

    Drilling with a continuous (rather than jointed) drill string is an old concept that is gaining new attention as a result of recent advances made in coiled tubing and drilling technology. The development of larger diameter, reliable, high-strength coiled tubing and smaller diameter, positive displacement motors, orienting tools, surveying systems and fixed cutting drill bits have given drilling with a continuous drill string a capability that was previously unattainable. Like its many other uses, (e.g., squeeze cementing, wellbore cleanouts, flow initiation, logging) the continuity of coiled tubing gives it several advantages over conventional drill strings. These include: drilling underbalanced safely, significantly reduced trip time, continuous circulation, smaller surface requirements. Coiled tubing drilling operations have smaller surface lease requirements than most conventional rigs due to the smaller footprint of the coiled tubing unit and associated equipment. Current coiled tubing drilling operations have the following limitations: conventional rig assistance is required for well preparation; conventional rigs must assist in running long protective and production casing strings or liners; hole sizes are smaller; working depth capabilities are shallower, coiled tubing life is less. This paper goes on to discuss the history of continuous drill strings and includes information on tubing units, circulating systems, drilling fluids, well control systems, downhole tools, orientation tools, and bottomhole assemblies. It then gives a cost comparison and an application of this type of drilling.

  11. ANDERSON LOCALIZATION FOR TIME PERIODIC

    E-Print Network [OSTI]

    disorder, Anderson localization in Z d is stable un- der localized time-periodic perturbations by proving random Schrodinger operators at large disorder has been well known since the seminal work of Fr is approximated by the potential V . The equation governing the system is (1.5) i @ @t = (#1; + V ) on Z d #2

  12. The maximum time interval of time-lapse photography for monitoring construction operations 

    E-Print Network [OSTI]

    Choi, Ji Won

    2005-11-01

    sec. 40 sec. 60 sec 3 min. 5 min. 10 min. E-B1 10.42% 11.47% 13.08% 17.00% 18.78% 18.75% 32.50% 47.03% 49.67% E-B2 5.36% 6.58% 12.14% 16.19% 12.69% 30.17% 27.97% 44.81% 35.97% E-H1 6.83% 12.08% 16.28% 19.92% 31.33% 25.22% 30.50% 39.64% 20.81% E-H2...

  13. A Computuerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

    2013-08-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

  14. A Computuerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

    2013-11-01

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

  15. STANDARD OPERATING PROTOCOLS FOR DECOMMISSIONING

    SciTech Connect (OSTI)

    Foss, D. L.; Stevens, J. L.; Gerdeman, F. W.

    2002-02-25

    Decommissioning projects at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites are conducted under project-specific decision documents, which involve extensive preparation time, public comment periods, and regulatory approvals. Often, the decision documents must be initiated at least one year before commencing the decommissioning project, and they are expensive and time consuming to prepare. The Rocky Flats Environmental Technology Site (RFETS) is a former nuclear weapons production plant at which hazardous substances and wastes were released or disposed during operations. As a result of the releases, RFETS was placed on the National Priorities List in 1989, and is conducting cleanup activities under a federal facilities compliance agreement. Working closely with interested stakeholders and state and federal regulatory agencies, RFETS has developed and implemented an improved process for obtaining the approvals. The key to streamlining the approval process has been the development of sitewide decision documents called Rocky Flats Cleanup Agreement Standard Operating Protocols or ''RSOPs.'' RSOPs have broad applicability, and could be used instead of project-specific documents. Although no two decommissioning projects are exactly the same and they may vary widely in contamination and other hazards, the basic steps taken for cleanup are usually similar. Because of this, using RSOPs is more efficient than preparing a separate project-specific decision documents for each cleanup action. Over the Rocky Flats cleanup life cycle, using RSOPs has the potential to: (1) Save over 5 million dollars and 6 months on the site closure schedule; (2) Eliminate preparing one hundred and twenty project-specific decision documents; and (3) Eliminate writing seventy-five closure description documents for hazardous waste unit closure and corrective actions.

  16. Random Operator Compressions

    E-Print Network [OSTI]

    Stephen Ng; Meg Walters

    2014-09-19

    Let $A$ be a Hermitian operator of order $n$. We show that for $k\\leq n$ sufficiently large, the eigenvalues of a compression of $A$ to a $k$-dimensional subspace are almost the same for all subspaces. We prove this result using the methods introduced in a paper by Chatterjee and Ledoux on eigenvalues of principle submatrices. We show that by choosing an appropriate Markov chain, the methods of Chatterjee and Ledoux can be applied to give a more general result on operator compressions. As an additional application of this method, we prove concentration of measure of the length of the longest increasing subsequence of a random walk distributed under the invariant measure for the asymmetric exclusion process.

  17. Operating Experience Committee Charter

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics AndBeryllium Disease | DepartmentOLED Stakeholder 137 Old InformationCHARTER FOR THE OPERATING

  18. Operational health physics training

    SciTech Connect (OSTI)

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  19. Reactor control rod timing system

    DOE Patents [OSTI]

    Wu, Peter T. K. (Clifton Park, NY)

    1982-01-01

    A fluid driven jet-edge whistle timing system for control rods of a nuclear reactor for producing real-time detection of the timing of each control rod in its scram operation. An important parameter in reactor safety, particularly for liquid metal fast breeder reactors (LMFBR), is the time deviation between the time the control rod is released and the time the rod actually reaches the down position. The whistle has a nearly pure tone signal with center frequency (above 100 kHz) far above the frequency band in which the energy of the background noise is concentrated. Each control rod can be fitted with a whistle with a different frequency so that there is no ambiguity in differentiating the signal from each control rod.

  20. Reactor control rod timing system

    SciTech Connect (OSTI)

    Wu, P.T.

    1982-02-09

    A fluid driven jet-edge whistle timing system for control rods of a nuclear reactor for producing real-time detection of the timing of each control rod in its scram operation. An important parameter in reactor safety, particularly for liquid metal fast breeder reactors (LMFBR), is the time deviation between the time the control rod is released and the time the rod actually reaches the down position. The whistle has a nearly pure tone signal with center frequency (Above 100 kHz) far above the frequency band in which the energy of the background noise is concentrated. Each control rod can be fitted with a whistle with a different frequency so that there is no ambiguity in differentiating the signal from each control rod.

  1. 1 Operating Systems overview & concepts

    E-Print Network [OSTI]

    Verschelde, Jan

    Outline 1 Operating Systems overview & concepts files and processes in UNIX the platform and os to Computer Science (MCS 260) Operating Systems & Turtle L-5 23 January 2015 1 / 36 #12;Operating Systems Turtle Graphics 1 Operating Systems overview & concepts files and processes in UNIX the platform and os

  2. Simulating the Dynamic Coupling of Market and Physical System Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Roop, Joseph M.; Guttromson, Ross T.; Huang, Zhenyu

    2004-06-01

    Abstract-As energy trading products cover shorter time periods and demand response programs move toward real-time pricing, financial market-based activity impacts ever more directly the physical operation of the system. To begin to understand the complex interactions between the market-driven operation signals, the engineered controlled schemes, and the laws of physics, new system modeling and simulation techniques must be explored. This discussion describes requirements for new simulation tools to address such market transaction control interactions and an approach to capture the dynamic coupling between energy markets and the physical operation of the power system appropriate for dispatcher reaction time frames.

  3. Dispatch R427 Time perception: Brain time or event time?

    E-Print Network [OSTI]

    Johnston, Alan

    Dispatch R427 Time perception: Brain time or event time? Alan Johnston* and Shin'ya Nishida Recent experiments show that synchronous events can appear to an observer to occur at different times. Neural processing time delays are offered as an explanation of these temporal illusions, but equating perceived time

  4. Time Bounds for Shared Objects in Partially Synchronous Systems 

    E-Print Network [OSTI]

    Wang, Jiaqi

    2012-02-14

    Shared objects are a key component in today's large distributed systems. Linearizability is a popular consistency condition for such shared objects which gives the illusion of sequential execution of operations. The time bound of an operation...

  5. Time Management Managing Time and Tasks

    E-Print Network [OSTI]

    Kunkle, Tom

    Time Management Managing Time and Tasks What is time management? Time can't be managed ­ but you can manage the amount of time you use each day for fun, work, rest, and time spent with others. Why is time management important? You have responsibilities to yourself, to your family and friends, to your

  6. Factors Affecting Auction Market Operating Costs. 

    E-Print Network [OSTI]

    Wootan, Charley V.; McNeely, John G.

    1966-01-01

    share of the total. If one auction diverts volume from another, the total ;~uction volume will be unchanged, and volume- intl11ced gains in efficiency at the first market will ~eritl to be offset by losses at the second. Given the present structure... Market Operating Costs Texas Summary and Conclusions T THE TIME THE DATA for this study were collected A there were 178 livestock auctions operating in Texas; 140 were included in this analysis. They ranyed in size from just over 5,000 animal units...

  7. Process for operating equilibrium controlled reactions

    DOE Patents [OSTI]

    Nataraj, Shankar (Allentown, PA); Carvill, Brian Thomas (Orefield, PA); Hufton, Jeffrey Raymond (Fogelsville, PA); Mayorga, Steven Gerard (Allentown, PA); Gaffney, Thomas Richard (Allentown, PA); Brzozowski, Jeffrey Richard (Bethlehem, PA)

    2001-01-01

    A cyclic process for operating an equilibrium controlled reaction in a plurality of reactors containing an admixture of an adsorbent and a reaction catalyst suitable for performing the desired reaction which is operated in a predetermined timed sequence wherein the heating and cooling requirements in a moving reaction mass transfer zone within each reactor are provided by indirect heat exchange with a fluid capable of phase change at temperatures maintained in each reactor during sorpreaction, depressurization, purging and pressurization steps during each process cycle.

  8. Field Operations Program Activities Status Report

    SciTech Connect (OSTI)

    J. E. Francfort; D. V. O'Hara; L. A. Slezak

    1999-05-01

    The Field Operations Program is an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed by the Idaho National Engineering and Environmental Laboratory. The Program's goals are to evaluate electric vehicles in real-world applications and environments, support electric vehicle technology advancement, develop infrastructure elements necessary to support significant electric vehicle use, support increased use of electric vehicles in federal fleets, and increase overall awareness and acceptance of electric vehicles. This report covers Program activities from fiscal year 1997 through mid-fiscal year 1999. The Field Operations Program succeeded the Site Operator Program, which ended in September 1996. Electric vehicle testing conducted by the Program includes baseline performance testing (EV America testing), accelerated reliability (life-cycle) testing, and fleet testing. The baseline performance parameters include accelerations, braking, range, energy efficiency, and charging time. The Program collects accelerated reliability and fleet operations data on electric vehicles operated by the Program's Qualified Vehicle Testing (QVT) partners. The Program's QVT partners have over 3 million miles of electric vehicle operating experience.

  9. ARM - SGP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Comments?govInstrumentsnoaacrnBarrow, Alaska OutreachCalendarPressExtended Facility SGP Related LinksOperations

  10. Operations | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating

  11. ARM - AMF Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.TheoryTuesday, August 10, 20102016 NewsUsers' Executive09 IArchitectureWestOperations

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovember 15

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovember 15E

  14. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovember

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrialSenior8 , OperationsNovemberto)

  16. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource and JobLCLS Operating Schedule August - December

  17. Operations Program Management Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSEHowScientificOmbudsTestimony SenateOperations

  18. Business Operations Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:I DueBETOof Energy Office of Business Operations

  19. Simultaneous Design, Scheduling and Operation Through Process Integration 

    E-Print Network [OSTI]

    Al-Mutairi, Eid M.

    2009-05-15

    detailed crude oil processing schedule, process unit schedule and blending and shipping schedule. The purpose of the scheduling is to transform the production plan into a schedule useful for all operations within a time horizon of a few days...

  20. The effects of variable operation on RO plant performance

    E-Print Network [OSTI]

    Williams, Christopher Michael, S.M. Massachusetts Institute of Technology

    2011-01-01

    Optimizations of reverse osmosis (RO) plants typically consider steady state operation of the plant. RO plants are subject to transient factors that may make it beneficial to produce more water at one time than at another. ...

  1. Concept of Operations for Data Fusion Visualization

    SciTech Connect (OSTI)

    T.R. McJunkin; R.L. Boring; M.A. McQueen; L.P. Shunn; J.L. Wright; D.I. Gertman; O. Linda; K. McCarty; M. Manic

    2011-09-01

    Situational awareness in the operations and supervision of a industrial system means that decision making entity, whether machine or human, have the important data presented in a timely manner. An optimal presentation of information such that the operator has the best opportunity accurately interpret and react to anomalies due to system degradation, failures or adversaries. Anticipated problems are a matter for system design; however, the paper will focus on concepts for situational awareness enhancement for a human operator when the unanticipated or unaddressed event types occur. Methodology for human machine interface development and refinement strategy is described for a synthetic fuels plant model. A novel concept for adaptively highlighting the most interesting information in the system and a plan for testing the methodology is described.

  2. Quantum entanglement of unitary operators on bi-partite systems

    E-Print Network [OSTI]

    X. Wang; P. Zanardi

    2002-07-01

    We study the entanglement of unitary operators on $d_1\\times d_2$ quantum systems. This quantity is closely related to the entangling power of the associated quantum evolutions. The entanglement of a class of unitary operators is quantified by the concept of concurrence.

  3. The Requirements for Becoming and Operating a Winery

    E-Print Network [OSTI]

    of the winery operation such as road signage, times of retail sales operation, guidelines for holding special of owners within 300 feet Copy of current paid tax bill, deed or other proof of ownership Statement with regard to access to the premises, required sprinkler systems, etc.; (b) the road commission; (c

  4. Cost-Informed Operational Process Support M. T. Wynn1

    E-Print Network [OSTI]

    van der Aalst, Wil

    Cost-Informed Operational Process Support M. T. Wynn1 , H. A. Reijers2,3 , M. Adams1 , C. Ouyang1 operations in alignment with the true origins of costs, and to be informed about this on a real-time basis, allows businesses to increase profitability. In most organisations however, high-level cost

  5. MULTILINEAR LOCALIZATION OPERATORS ELENA CORDERO AND KASSO A. OKOUDJOU ;y

    E-Print Network [OSTI]

    Okoudjou, Kasso A.

    and to extract its time-frequency features. Moreover, besides their natural Date: October 3, 2005. 2000 operators are bounded on products of modulation spaces. In particular, by assuming that the symbols operators on products of modulation spaces. Moreover, we show the suÃ?cient boundedness condition is also

  6. Arithmetic units for RNS moduli {2n + 3} operations

    E-Print Network [OSTI]

    Sousa, Leonel

    Arithmetic units for RNS moduli {2n - 3} and {2n + 3} operations Pedro Miguens Matutino Department in Residue Number Systems (RNS), increasing the number of channels. With this, the processing time can the parallelism. In this paper, hardware structures for addition and multiplication operation in RNS

  7. Operating Systems Introduction

    E-Print Network [OSTI]

    Bogliolo, Alessandro

    by the environment" 4 Introduction (2) ¿ Examples of real-time systems: ¿ plant control ¿ control of production systems ¿ space missions ¿ household appliances ¿ virtual / augmented reality #12;3 5 Introduction (3 of application: ¿ Automotive: · power-train control, air-bag control, steer by wire, brake by wire ¿ Aircraft

  8. FRMAC Operations Manual

    SciTech Connect (OSTI)

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  9. The Operational Sex Ratio, theThe Operational Sex Ratio, the Potential Reproductive Rate, andPotential Reproductive Rate, and

    E-Print Network [OSTI]

    Shuster, Stephen M.

    of each sex willing (or able) to mate at any given time (Kemp & Macedonia 2006) The "Operational Sex Ratio 1999; Kemp & Macedonia 2007) Mate selection and choosiness: (Rosenqvist 1993; Berglund 1994; Kokko

  10. Nuclear Physics: Experiment Research - Call for Beam Time Requests

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Free-Electron Laser (FEL) Medical Imaging Physics Topics Campaigns Meetings Recent Talks Archived Talks Additional Information Computing at JLab Operations Logbook Beam Time...

  11. Symmetry of the Riemann Operator

    E-Print Network [OSTI]

    B. Aneva

    2008-04-10

    Chaos quantization conditions, which relate the eigenvalues of a Hermitian operator (the Riemann operator) with the non-trivial zeros of the Riemann zeta function are considered, and their geometrical interpretation is discussed.

  12. Business and Operations Financial Planning

    E-Print Network [OSTI]

    Barrash, Warren

    Business and Operations Financial Planning Resource Allocation Human Resources Administrative Organizations Dean on Call Games Center Campus Programs Title IX Investigation Parent and Family Outreach Main Store Recreation and Education Scholarships Stadium Facilities and Operations Student Accommodations

  13. TACTICAL RADIO OPERATIONS August 2009

    E-Print Network [OSTI]

    US Army Corps of Engineers

    FM 6-02.53 TACTICAL RADIO OPERATIONS August 2009 DISTRIBUTION RESTRICTION. Approved for public August 2009 TACTICAL RADIO OPERATIONS Contents Page PREFACE ...........................................................................................................viii Chapter 1 APPLICATIONS FOR TACTICAL RADIO DEPLOYMENT.............................. 1-1 Modularity

  14. Machine Learning with Operational Costs

    E-Print Network [OSTI]

    Rudin, Cynthia

    This work proposes a way to align statistical modeling with decision making. We provide a method that propagates the uncertainty in predictive modeling to the uncertainty in operational cost, where operational cost is the ...

  15. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-08

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Supersedes DOE O 210.2.

  16. The Bender-Dunne basis operators as Hilbert space operators

    SciTech Connect (OSTI)

    Bunao, Joseph; Galapon, Eric A. E-mail: eric.galapon@upd.edu.ph

    2014-02-15

    The Bender-Dunne basis operators, T{sub ?m,n}=2{sup ?n}?{sub k=0}{sup n}(n/k )q{sup k}p{sup ?m}q{sup n?k} where q and p are the position and momentum operators, respectively, are formal integral operators in position representation in the entire real line R for positive integers n and m. We show, by explicit construction of a dense domain, that the operators T{sub ?m,n}'s are densely defined operators in the Hilbert space L{sup 2}(R)

  17. Network Operating Systems Partha Dasgupta

    E-Print Network [OSTI]

    Dasgupta, Partha

    Network Operating Systems Partha Dasgupta Department of Computer Science and Engineering Arizona of Electrical Engineering] 1. Introduction Network Operating Systems extend the facilities and services provided by computer operating systems to support a set of computers, connected by a network. The environment managed

  18. Unambiguous discrimination among oracle operators

    E-Print Network [OSTI]

    Anthony Chefles; Akira Kitagawa; Masahiro Takeoka; Masahide Sasaki; Jason Twamley

    2007-07-08

    We address the problem of unambiguous discrimination among oracle operators. The general theory of unambiguous discrimination among unitary operators is extended with this application in mind. We prove that entanglement with an ancilla cannot assist any discrimination strategy for commuting unitary operators. We also obtain a simple, practical test for the unambiguous distinguishability of an arbitrary set of unitary operators on a given system. Using this result, we prove that the unambiguous distinguishability criterion is the same for both standard and minimal oracle operators. We then show that, except in certain trivial cases, unambiguous discrimination among all standard oracle operators corresponding to integer functions with fixed domain and range is impossible. However, we find that it is possible to unambiguously discriminate among the Grover oracle operators corresponding to an arbitrarily large unsorted database. The unambiguous distinguishability of standard oracle operators corresponding to totally indistinguishable functions, which possess a strong form of classical indistinguishability, is analysed. We prove that these operators are not unambiguously distinguishable for any finite set of totally indistinguishable functions on a Boolean domain and with arbitrary fixed range. Sets of such functions on a larger domain can have unambiguously distinguishable standard oracle operators and we provide a complete analysis of the simplest case, that of four functions. We also examine the possibility of unambiguous oracle operator discrimination with multiple parallel calls and investigate an intriguing unitary superoperator transformation between standard and entanglement-assisted minimal oracle operators.

  19. Operating Reserves and Variable Generation

    SciTech Connect (OSTI)

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  20. Energy Consumption of Die Casting Operations

    SciTech Connect (OSTI)

    Jerald Brevick; clark Mount-Campbell; Carroll Mobley

    2004-03-15

    Molten metal processing is inherently energy intensive and roughly 25% of the cost of die-cast products can be traced to some form of energy consumption [1]. The obvious major energy requirements are for melting and holding molten alloy in preparation for casting. The proper selection and maintenance of melting and holding equipment are clearly important factors in minimizing energy consumption in die-casting operations [2]. In addition to energy consumption, furnace selection also influences metal loss due to oxidation, metal quality, and maintenance requirements. Other important factors influencing energy consumption in a die-casting facility include geographic location, alloy(s) cast, starting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting machine, related equipment (robots, trim presses), and downstream processing (machining, plating, assembly, etc.). Each of these factors also may influence the casting quality and productivity of a die-casting enterprise. In a die-casting enterprise, decisions regarding these issues are made frequently and are based on a large number of factors. Therefore, it is not surprising that energy consumption can vary significantly from one die-casting enterprise to the next, and within a single enterprise as function of time.

  1. Optimal operation and design of solar-thermal energy storage systems

    E-Print Network [OSTI]

    Lizarraga-García, Enrique

    2012-01-01

    The present thesis focuses on the optimal operation and design of solar-thermal energy storage systems. First, optimization of time-variable operation to maximize revenue through selling and purchasing electricity to/from ...

  2. UGE Scheduler Cycle Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UGE Scheduler Cycle Time UGE Scheduler Cycle Time Genepool Cycle Time Genepool Daily Genepool Weekly Phoebe Cycle Time Phoebe Daily Phoebe Weekly What is the Scheduler Cycle? The...

  3. Time delay for dispersive systems in quantum scattering theory

    E-Print Network [OSTI]

    Rafael Tiedra de Aldecoa

    2008-10-06

    We consider time delay and symmetrised time delay (defined in terms of sojourn times) for quantum scattering pairs $\\{H_0=h(P),H\\}$, where $h(P)$ a dispersive operator of hypoelliptic-type. For instance $h(P)$ can be one of the usual elliptic operators such as the Schr\\"odinger operator $h(P)=P^2$ or the square-root Klein-Gordon operator $h(P)=\\sqrt{1+P^2}$. We show under general conditions that the symmetrised time delay exists for all smooth even localization functions. It is equal to the Eisenbud-Wigner time delay plus a contribution due to the non-radial component of the localization function. If the scattering operator $S$ commutes with some function of the velocity operator $\

  4. High resolution time interval meter

    DOE Patents [OSTI]

    Martin, A.D.

    1986-05-09

    Method and apparatus are provided for measuring the time interval between two events to a higher resolution than reliability available from conventional circuits and component. An internal clock pulse is provided at a frequency compatible with conventional component operating frequencies for reliable operation. Lumped constant delay circuits are provided for generating outputs at delay intervals corresponding to the desired high resolution. An initiation START pulse is input to generate first high resolution data. A termination STOP pulse is input to generate second high resolution data. Internal counters count at the low frequency internal clock pulse rate between the START and STOP pulses. The first and second high resolution data are logically combined to directly provide high resolution data to one counter and correct the count in the low resolution counter to obtain a high resolution time interval measurement.

  5. Operation Diagnostics - Use of Operation Patterns to Verify and Optimize Building and System Operation 

    E-Print Network [OSTI]

    Baumann, O.

    2004-01-01

    Building energy management systems (BEMS) process a large amount of data to operate the building. Instead of using this data only to signal failures and breakdowns of systems, it can be further employed for enhanced operation diagnostics. Adequate...

  6. Time and Labor Manual -Time Keepers -LSUSH

    E-Print Network [OSTI]

    Time and Labor Manual - Time Keepers - LSUSH Version Date: July 2012 #12;COPYRIGHT & TRADEMARKS create a risk of personal injury. If you use this software in dangerous applications, then you shall Guide Time and Labor Manual - Time Keepers - LSUSH Page iii Table of Contents Time and Labor Manual

  7. Time Commitments Where Does Your Time Go

    E-Print Network [OSTI]

    Kunkle, Tom

    Time Commitments Where Does Your Time Go Everyone starts the week with the same number of hours. So, why does your time go so fast? Let's find out! Number of hours of sleep each night ____ x 7 preparation/clean-up time) ____ x 7 = ____ Travel time to and from campus ___ x __ = ____ Number of hours per

  8. Femtosecond Operation of the LCLS for User Experiments

    SciTech Connect (OSTI)

    Frisch, Josef; /SLAC; Bostedt, Christoph; /SLAC; Bozek, John; /SLAC; Brachmann, Axel; /SLAC; Coffee, Ryan; /SLAC; Decker, Franz-Josef; /SLAC; Ding, Yuantao; /SLAC; Dowell, David; /SLAC; Emma, Paul; /SLAC; Gilevich, Sasha; /SLAC; Haller, Gunther; /SLAC; Hays, Gregory; /SLAC; Hering, Philippe; /SLAC; Hill, Bruce; /SLAC; Huang, Zhirong; /SLAC; Iverson, Richard /SLAC; Kanter, Elliot; /SLAC; Kraessig, Bertold; /SLAC; Loos, Henrik; /SLAC; Miahnahri, Alan; /SLAC; Nuhn, Heinz-Dieter; /SLAC /SLAC /SLAC /SLAC /SLAC /SLAC /SLAC /SLAC /SLAC /SLAC /SLAC /LBL, Berkeley

    2010-09-02

    In addition to its normal operation at 250pC, the LCLS has operated with 20pC bunches delivering X-ray beams to users with energies between 800eV and 2 keV and with bunch lengths below 10 fs FWHM. A bunch arrival time monitor and timing transmission system provide users with sub 50 fs synchronization between a laser and the X-rays for pump/probe experiments. We describe the performance and operational experience of the LCLS for short bunch experiments.

  9. Operating experience review of an INL gas monitoring system

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Cadwallader, Lee C.; DeWall, K. G.; Herring, J. S.

    2015-03-01

    This article describes the operations of several types of gas monitors in use at the Idaho National Laboratory (INL) High Temperature Electrolysis Experiment (HTE) laboratory. The gases monitored in the lab room are hydrogen, carbon monoxide, carbon dioxide, and oxygen. The operating time, calibration, and both actual and unwanted alarms are described. The calibration session time durations are described. Some simple calculations are given to estimate the reliability of these monitors and the results are compared to operating experiences of other types of monitors.

  10. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L.; Stephens, R.K. )

    1992-09-01

    This paper reports on coiled tubing units which are used for many types of remedial well operations, including sand plugbacks, cement squeezes, fill cleanouts, underreaming, acid stimulations, and fishing. Fishing operations include removal of inflatable bridge plugs, lock mandrels stuck in profile nipples, coiled tubing, coiled tubing bottomhole assemblies (BHAs) and wireline. Recommended guidelines for selecting candidates, proper tool string configuration and operational techniques are presented here to assist coiled tubing supervisors and company representatives in the planning and implementation of efficient and effective fishing operations. Treatment of these areas are not intended to be exhaustive, but rather generally representative of common applications. Each fishing operation requires individualized analysis and planning.

  11. Battery operation experience at SSAB, Luleaa six years after rehabilitation

    SciTech Connect (OSTI)

    Petrini, H.; Sundgren, M. [SSAB Tunnplaat, Luleaa (Sweden); Meyer, G. [Krupp Koppers GmbH, Essen (Germany)

    1995-12-01

    SSAB operates a coke oven plant in Luleaa, Sweden, consisting of one 7 m battery. Pushing the first coke in 1975, the battery encountered over the years more and more difficulties in keeping coking time and operation level at the design rate. In order to improve the coke supply a major repair of the battery was made. In 1989 the battery was fully rehabilitated by Krupp Koppers. The experience made during the years before and during repair contributed to a new policy for the operation of the plant. The policy has led to considerable improvements. It is clear that it is possible to successfully operate a rehabilitated battery.

  12. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. National Synchrotron Light Source guidelines for the conduct of operations

    SciTech Connect (OSTI)

    Buckley, M. [Brookhaven National Lab., Upton, NY (United States). National Synchrotron Light Source

    1998-01-01

    To improve the quality and uniformity of operations at the Department of Energy`s facilities, the DOE issued Order 5480.19 ``Conduct of Operations Requirements at DOE facilities.`` This order recognizes that the success of a facilities mission critically depends upon a high level of performance by its personnel and equipment. This performance can be severely impaired if the facility`s Conduct of Operations pays inadequate attention to issues of organization, safety, health, and the environment. These guidelines are Brookhaven National Laboratory`s and the National Synchrotron Light Source`s acknowledgement of the principles of Conduct of Operations and the response to DOE Order 5480.19. These guidelines cover the following areas: (1) operations organization and administration; (2) shift routines and operating practices; (3) control area activities; (4) communications; (5) control of on-shift training; (6) investigation of abnormal events; (7) notifications; (8) control of equipment and system studies; (9) lockouts and tagouts; (10) independent verification; (11) log-keeping; (12) operations turnover; (13) operations aspects of facility process control (14) required reading; (15) timely orders to operators; (16) operations procedures; (17) operator aid posting; and (18) equipment sizing and labeling.

  14. EDS operator and control software

    SciTech Connect (OSTI)

    Ott, L.L.

    1985-04-01

    The Enrichment Diagnostic System (EDS) was developed at Lawrence Livermore National Laboratory (LLNL) to acquire, display and analyze large quantities of transient data for a real-time Advanced Vapor Laser Isotope Separation (AVLIS) experiment. Major topics discussed in this paper are the EDS operator interface (SHELL) program, the data acquisition and analysis scheduling software, and the graphics software. The workstation concept used in EDS, the software used to configure a user's workstation, and the ownership and management of a diagnostic are described. An EDS diagnostic is a combination of hardware and software designed to study specific aspects of the process. Overall system performance is discussed from the standpoint of scheduling techniques, evaluation tools, optimization techniques, and program-to-program communication methods. EDS is based on a data driven design which keeps the need to modify software to a minimum. This design requires a fast and reliable data base management system. A third party data base management product, Berkeley Software System Database, written explicitly for HP1000's, is used for all EDS data bases. All graphics is done with an in-house graphics product, Device Independent Graphics Library (DIGLIB). Examples of devices supported by DIGLIB are: Versatec printer/plotters, Raster Technologies Graphic Display Controllers, and HP terminals (HP264x and HP262x). The benefits derived by using HP hardware and software as well as obstacles imposed by the HP environment are presented in relation to EDS development and implementation.

  15. Remote Operation of the Fermilab/NICADD Photoinjector

    SciTech Connect (OSTI)

    Nikolai Barov et al.

    2002-03-21

    The recognition that a new major HEP facility must receive international support and that its execution would benefit from worldwide interaction from design through operation has given rise to the term Global Accelerator Network (GAN). A welcome consequence has been a more permissive attitude toward remote operation of existing facilities.For roughly thirty years, the computer has been the principal operator interface to the beam,and, through the development of the Internet, the operator can be literally anywhere. In this note, the authors describe their approach to enabling a sufficient degree of operation of the photoinjector from afar in order to carry out investigations in beam physics. The goal was to do so on a time scale of a few months and at minimal cost. At this writing, remote shifts are routinely scheduled involving DESY and LBL, limited in frequency only by the requests of the collaborators and by the need for time to interpret the data.

  16. MSc Applied Mathematics Stochastic Operations Research

    E-Print Network [OSTI]

    Boucherie, Richard J.

    MSc Applied Mathematics Stochastic Operations Research Richard Boucherie #12;20150106Stochastic Operations Research #12;Stochastic Operations Research: Team http://www.utwente.nl/ewi/sor/staff/ 20150106Stochastic Operations Research #12;Operations Research: The World http

  17. List Processing in Real Time on a Serial Computer

    E-Print Network [OSTI]

    Baker, Henry G. Jr.

    1977-04-01

    A real-time list processing system is one in which the time required by each elementary list operation (CONS, CAR, CDR, RPLACA, RPLACD, EQ, and ATOM in LISP) is bounded by a (small) constant. Classical list processing ...

  18. Part-Time Farming in Northeast Texas. 

    E-Print Network [OSTI]

    Martin, James R.; Southern, John H.

    1961-01-01

    days or more, includes 43 percent of all part-time operators. Part-time operators controlled 40 percent of the farm and land resources, marketed 28 percent of all farm products sold (in terms of value), but received only 16 percent of the net money...). The average value of farm resources was $16,024 with land $12,803, live- dock $1,846 and equipment $1,375. Part-time farmers controlled 29 percent of ie cropland and 33 percent of all idle crop- acres. However, they had relatively more ~~~~~dre, 42...

  19. Transportation Time In A Rural State Following Splenic Injury: Does Time Matter

    E-Print Network [OSTI]

    Ward, Jeanette G.

    2014-05-31

    Background: Failure rates remain high following attempted non-operative treatment of spleen injuries despite progress made in identifying risk factors. Over the past thirty years, transportation times were excluded from predictive models although...

  20. Enhancing Building Operations Through Automated Diagnostics: Field Test Results 

    E-Print Network [OSTI]

    Katipamula, S.; Brambley, M. R.; Bauman, N.; Pratt, R. G.

    2003-01-01

    Northwest National Laboratory (PNNL),1 initially in collaboration with the Honeywell Technology Center and the University of Colorado, the WBD is a production-prototype software package with two modules providing automated diagnostics for buildings.... Pratt, R.G., N.N. Bauman, and S. Katipamula. 2003. ?New Technology Demonstration of the Whole-Building Diagnostician at the Federal Aviation Administration-Denver Airport.? PNNL- 14157, Pacific Northwest National Laboratory, Richland, Washington...

  1. Real Time Grid Reliability Management 2005

    SciTech Connect (OSTI)

    Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

    2008-07-07

    The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

  2. DOE limited standard: Operations assessments

    SciTech Connect (OSTI)

    NONE

    1996-05-01

    Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

  3. CHRPR Operations Manual

    SciTech Connect (OSTI)

    Windsor, Bradford T.; Woodring, Mitchell L.; Myjak, Mitchell J.

    2012-08-21

    1.0 Overview The TSA systems VM-250AGN portal monitor is a set of two pillars made to detect nuclear material in a vehicle. Each pillar contains two polyvinyl toluene (PVT) plastic gamma ray detectors and four 3He neutron detectors, as well as a power supply and electronics to process the output from these detectors. Pacific Northwest National Laboratory has designed and built a continuous high-resolution PVT readout (CHRPR) for the TSA portal to allow spectral readout from the gamma and neutron detectors. The CHRPR helps differentiate between different types of radioactive material through increased spectroscopic capability and associated developments. The TSA VM-250AGN continually monitors the natural neutron and gamma ray background which occurs around the pillars. When the system is installed, the two pillars are placed on either side of a roadway, and a vehicle presence sensor records the passage of cars between them. When radiation measurements exceed a preset alarm threshold, the system alarms to let the user know that a radioactive material is present. Time-stamped measurements are continually sent to a computer, where they can be recorded via a Windows terminal or the TSA RAVEN software. For each pillar in the original TSA model, output from each detector is amplified and shaped by a single channel analyzer, the SCA-775. Information from both SCA-775’s are passed to the SC-770 in the master pillar. This is the detector interface module and main data processor. It counts electrical pulses and uses program software to output total readings to the computer, as well as trigger any appropriate alarms. The CHRPR allows a parallel approach to recording radiation readings from the TSA system. After installing the CHRPR system, all TSA power and signal connections are unchanged. The CHRPR captures electrical pulses containing detector and occupancy sensor information from the SCA-775 on either side. These pulses are converted to a signal with a time width proportional to the amplitude, via voltage to pulse width converters (VPW). These time widths are then digitized by a field programmable gate array (FPGA) and transmitted over Ethernet to a data acquisition computer. The CHRPR records the magnitude of each pulse to a continuous event mode file on or each detector and occupancy sensor This manual begins with CHRPR installation instructions, then a section on CHRPR software. Afterward is a brief overview of how the TSA system works, then an explanation of the CHRPR. This manual is meant as a supplement to the TSA VM-250AGN manual, which can be found at http://tsasystems.com/library/manuals/pm700agn-vm250agn_manual.pdf . That manual is the manufacturer’s guide for the installation, programming, and maintenance of the portal system.

  4. Operating data to In-Tank Solidification (ITS)-2 for January 1 to October 10, 1974

    SciTech Connect (OSTI)

    Reich, F.R., Westinghouse Hanford

    1996-08-02

    Data sheets containing date, time, feet above bottom,temperature, comments. Operating data to In-Tank Solidification (ITS)-2 for January 1 to October 10, 1974.

  5. FUPWG Purpose, Policies, and Operations

    Broader source: Energy.gov [DOE]

    Draft report—last updated July 22, 2010—discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group (FUPWG).

  6. GREEN'S FUNCTIONS OF VORTEX OPERATORS

    E-Print Network [OSTI]

    Polchinski, Joseph

    2013-01-01

    8 g Olesen vortex • , somewhere in space. The tube between cvortex operators have surface clustering, as this implies that magnetic flux is forming into tubes.

  7. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  8. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  9. Jefferson Lab Chief Operating Officer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COO Privacy and Security Notice Skip over navigation Search the JLab Site Chief Operating Officer Please upgrade your browser. This site's design is only visible in a graphical...

  10. SPECTR System Operational Test Report

    SciTech Connect (OSTI)

    W.H. Landman Jr.

    2011-08-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  11. OPTIMAL OPERATION OF INTEGRATED PROCESSES

    E-Print Network [OSTI]

    Skogestad, Sigurd

    OPTIMAL OPERATION OF INTEGRATED PROCESSES Studies on Heat Recovery Systems by Bjørn Glemmestad exchanger network (HEN) for heat recovery. Within the process engineering community, much attention has been

  12. Tripol condensate polishing - operational experience

    SciTech Connect (OSTI)

    Swainsbury, D. [Mission Energy Management Australia, Victoria (Australia)

    1995-01-01

    This paper gives a brief outline of the Mission Energy Management Australia Company who operate and maintain the Loy Yang B Power Station in the Latrobe Valley, Victoria, Australia. Details of the plant configuration, the water/steam circuit and cycle chemistry are discussed. The arrangement of the TRIPOL Condensate Polishing Plant and it`s operational modes are examined. Results of the first twelve months operation of the TRIPOL plant are detailed. Levels of crud removal during early commissioning phases employing the pre-filter are presented. Typical parameters achieved during a simulated condenser leak and an operational run beyond the ammonia break point are also documented.

  13. INTEGRATED HATCHERY OPERATIONS TEAM OPERATION PLANS FOR ANADROMOUS FISH

    E-Print Network [OSTI]

    1992 DOE/BP-60629-4 #12;This report was funded by the Bonneville Power Administration (BPA), U Report DOE/BP-60629-4) This report and other BPA Fish and Wildlife Publications are available, and DOE/BP number in the request. #12;INTEGRATED HATCHERY OPERATIONS TEAM OPERATION PLANS FOR ANADROMOUS

  14. Estimate of air carrier and air taxi crash frequencies from high altitude en route flight operations

    SciTech Connect (OSTI)

    Sanzo, D.; Kimura, C.Y.; Prassinos, P.G.

    1996-06-03

    In estimating the frequency of an aircraft crashing into a facility, it has been found convenient to break the problem down into two broad categories. One category estimates the aircraft crash frequency due to air traffic from nearby airports, the so-called near-airport environment. The other category estimates the aircraft crash frequency onto facilities due to air traffic from airways, jet routes, and other traffic flying outside the near-airport environment The total aircraft crash frequency is the summation of the crash frequencies from each airport near the facility under evaluation and from all airways, jet routes, and other traffic near the facility of interest. This paper will examine the problems associated with the determining the aircraft crash frequencies onto facilities outside the near-airport environment. This paper will further concentrate on the estimating the risk of aircraft crashes to ground facilities due to high altitude air carrier and air taxi traffic. High altitude air carrier and air taxi traffic will be defined as all air carrier and air taxi flights above 18,000 feet Mean Sea Level (MSL).

  15. ENERGY MANAGEMENT OPERATIONAL PROCEDURE MANUAL

    E-Print Network [OSTI]

    Harman, Neal.A.

    ENERGY MANAGEMENT OPERATIONAL PROCEDURE MANUAL Swansea University Estates Services Singleton Park Swansea SA2 8PP Tel 01792 295819 Fax 01792 295820 #12;Swansea University Energy Management Operational Procedural Manual Estates Services April 2008 rev 1 Created on 4/15/2008 4:23:00 PM - 2 - Contents 1. Energy

  16. Optimization of Wind Turbine Operation

    E-Print Network [OSTI]

    Optimization of Wind Turbine Operation by Use of Spinner Anemometer TF Pedersen, NN Sørensen, L Title: Optimization of Wind Turbine Operation by Use of Spinner Anemometer Department: Wind Energy prototype wind turbine. Statistics of the yaw error showed an average of about 10°. The average flow

  17. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-12

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  18. MANGO – Modal Analysis for Grid Operation: A Method for Damping Improvement through Operating Point Adjustment

    SciTech Connect (OSTI)

    Huang, Zhenyu; Zhou, Ning; Tuffner, Francis K.; Chen, Yousu; Trudnowski, Daniel J.; Diao, Ruisheng; Fuller, Jason C.; Mittelstadt, William A.; Hauer, John F.; Dagle, Jeffery E.

    2010-10-18

    Small signal stability problems are one of the major threats to grid stability and reliability in the U.S. power grid. An undamped mode can cause large-amplitude oscillations and may result in system breakups and large-scale blackouts. There have been several incidents of system-wide oscillations. Of those incidents, the most notable is the August 10, 1996 western system breakup, a result of undamped system-wide oscillations. Significant efforts have been devoted to monitoring system oscillatory behaviors from measurements in the past 20 years. The deployment of phasor measurement units (PMU) provides high-precision, time-synchronized data needed for detecting oscillation modes. Measurement-based modal analysis, also known as ModeMeter, uses real-time phasor measurements to identify system oscillation modes and their damping. Low damping indicates potential system stability issues. Modal analysis has been demonstrated with phasor measurements to have the capability of estimating system modes from both oscillation signals and ambient data. With more and more phasor measurements available and ModeMeter techniques maturing, there is yet a need for methods to bring modal analysis from monitoring to actions. The methods should be able to associate low damping with grid operating conditions, so operators or automated operation schemes can respond when low damping is observed. The work presented in this report aims to develop such a method and establish a Modal Analysis for Grid Operation (MANGO) procedure to aid grid operation decision making to increase inter-area modal damping. The procedure can provide operation suggestions (such as increasing generation or decreasing load) for mitigating inter-area oscillations.

  19. Energy-time and frequency-time uncertainty relations: exact inequalities

    E-Print Network [OSTI]

    V. V. Dodonov; A. V. Dodonov

    2015-04-03

    We give a short review of known exact inequalities that can be interpreted as "energy-time" and "frequency-time" uncertainty relations. In particular we discuss a precise form of signals minimizing the physical frequency-time uncertainty product. Also, we calculate the "stationarity time" for mixed Gaussian states of a quantum harmonic oscillator, showing explicitly that pure quantum states are "more fragile" than mixed ones with the same value of the energy dispersion. The problems of quantum evolution speed limits, time operators and measurements of energy and time are briefly discussed, too.

  20. Time Crystals from Minimum Time Uncertainty

    E-Print Network [OSTI]

    Mir Faizal; Mohammed M. Khalil; Saurya Das

    2014-12-29

    Motivated by the Generalized Uncertainty Principle, covariance, and a minimum measurable time, we propose a deformation of the Heisenberg algebra, and show that this leads to corrections to all quantum mechanical systems. We also demonstrate that such a deformation implies a discrete spectrum for time. In other words, time behaves like a crystal.

  1. Robotics Learning Center Milling Machine Operation Manual

    E-Print Network [OSTI]

    Miller, Damon A.

    Robotics Learning Center Milling Machine Operation Manual Ken Gruel, Dr. Massood Atashbar, RyanMaster.............................................................................................................. 16 6. Milling Machine Operation for the operation of the LPKF® milling machine, and then gives an overview of the physical operation of the machine

  2. Campus Operations Page 1 University of Oregon

    E-Print Network [OSTI]

    Operations and Maintenance; 2.) Capital Construction; 3.) Utilities Services, 4.) Custodial Services; and 5 the operations, maintenance, and cleaning of campus buildings, building systems, utilities, equipmentCampus Operations Page 1 University of Oregon Campus Operations Strategic Diversity Action Plan

  3. Aviation security: A system's perspective

    SciTech Connect (OSTI)

    Martin, J.P.

    1988-01-01

    For many years the aviation industry and airports operated with security methods and equipment common to most other large industrial complexes. At that time, the security systems primarily provided asset and property protection. However, soon after the first aircraft hijacking the focus of security shifted to emphasize the security requirements necessary for protecting the traveling public and the one feature of the aviation industry that makes it unique---the airplane. The airplane and its operation offered attractive opportunities for the homesick refugee, the mentally unstable person and the terrorist wanting to make a political statement. The airport and its aircraft were the prime targets requiring enhanced security against this escalated threat. In response, the FAA, airport operators and air carriers began to develop plans for increasing security and assigning responsibilities for implementation.

  4. An operator view on alliances in politics

    E-Print Network [OSTI]

    Bagarello, Fabio

    2015-01-01

    We introduce the concept of an {\\em operator decision making technique} and apply it to a concrete political problem: should a given political party form a coalition or not? We focus on the situation of three political parties, and divide the electorate into four groups: partisan supporters of each party and a group of undecided voters. We consider party-party interactions of two forms: shared or differing alliance attitudes. Our main results consist of time-dependent decision functions for each of the three parties, and their asymptotic values, i.e., their final decisions on whether or not to form a coalition.

  5. Enhanced Building Operation Using "Operation Diagnostics" - A Case Study 

    E-Print Network [OSTI]

    Baumann, O.

    2005-01-01

    der Auto- mationsfunktionen in einem Bürogebäude, Diploma Thesis, Ebert-Ingenieure München, Munich University of Applied Science. [6] Kadar, P. 2005. Erstellung und Verifizierung von Betriebsmustern zur Beschreibung von Raumtypicals, Diploma... Simulation Ebert-Ingenieure München (Consulting Engineers) Munich, Germany ABSTRACT At former ICEBO’s in 2003 and 2004 papers have been presented by the author that showed the approach and meth- odology of ‘operation diagnostics’ and ‘operation...

  6. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  18. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Reservoir-Stimulation Optimization with Operational Monitoring...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimization with Operational Monitoring for Creation of Enhanced Geothermal Systems Reservoir-Stimulation Optimization with Operational Monitoring for Creation...

  20. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Spin Operators for Massive Particles

    E-Print Network [OSTI]

    Taeseung Choi; Sam Young Cho

    2014-10-02

    How to define a proper relativistic spin operator, as a long-standing problem, has by now become a central task for providing proper concepts and applications of spin in relativistic and non-relativistic quantum mechanics as well as solving emergent inconsistencies in rapidly developing research areas. We rigorously {\\it derive} a relativistic spin operator for an arbitrary spin massive particle on the two requirements that a proper spin operator should satisfy (i) the $\\mathfrak{su}(2)$ algebra and (ii) the Lorentz-transformation properties as a second-rank spin tensor. These requirements lead to two spin operators, properly giving the second Casimir invariant operator in the Poincar\\'e (inhomogeneous Lorentz) group, that provide the two inequivalent representations of Poincar\\'e group. We find that the two inequivalent representations are the left-handed and the right-handed representations. Each of the two spin operators generates a Wigner little group whose representation space is composed of spin-$s$ spin states. In the case that the Poincar\\'e group is extended by parity, only nonchiral $(s,s)$ representations and direct-sum $(s,s') \\oplus (s',s)$ representations are allowed. In the $(1/2,0)\\oplus (0,1/2)$ representation, we redrive the covariant Dirac equation by using the covariant parity operator defined by the two spin operators. This derivation deepens our understanding how the Dirac equation describes the spin-$1/2$ massive relativistic particle successfully. We have also discussed some important properties of our relativistic spin operators with arbitrary spin.

  2. ARM Operations and Engineering Procedure Mobile Facility Site Startup

    SciTech Connect (OSTI)

    Voyles, Jimmy W

    2015-05-01

    This procedure exists to define the key milestones, necessary steps, and process rules required to commission and operate an Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF), with a specific focus toward on-time product delivery to the ARM Data Archive. The overall objective is to have the physical infrastructure, networking and communications, and instrument calibration, grooming, and alignment (CG&A) completed with data products available from the ARM Data Archive by the Operational Start Date milestone.

  3. The hypoelliptic Dirac operator Jean-Michel Bismut

    E-Print Network [OSTI]

    Bismut, Jean-Michel

    .4. The elliptic Dirac operator 16 1.5. The superconnection D 16 1.6. The operator DZ 19 1.7. The time parameter 19.14. Interpolating between the Laplacian and the geodesic flow 25 2. A deformation of the Levi-Civita superconnection 27 2.1. The Levi-Civita superconnection 27 2.2. A construction of superconnections and fibrewise

  4. AVESTAR Center for operational excellence of electricity generation plants

    SciTech Connect (OSTI)

    Zitney, S.

    2012-01-01

    To address challenges in attaining operational excellence for clean energy plants, the U.S.Department of Energy’s National Energy Technology Laboratory has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTAR™). The AVESTAR Center brings together state-of-the-art, real time,high-fidelity dynamic simulators with operator training systems and 3D virtual immersive training systems into an integrated energy plant and control room environment.

  5. MANAGING OPERATIONS AND SERVICES (80352, MGTK 511-115) SYLLABUS, FALL 2014

    E-Print Network [OSTI]

    Diestel, Geoff

    -based competition, and quality improvement. Operations management involves the integration of numerous activities1 MANAGING OPERATIONS AND SERVICES (80352, MGTK 511-115) SYLLABUS, FALL 2014 MEETING TIME, cost or quality. Most now agree that world class performance in operations is essential for competitive

  6. Managing Contention and Timing Constraints in a RealTime Database System \\Lambda

    E-Print Network [OSTI]

    Son, Sang H.

    22903, USA Abstract Previous work in real­time database management systems (RT­DBMS) has primarily based an actual RT­ DBMS on a real­time microkernel operating system. A real RT­DBMS must confront many practical of con­ structing a RT­DBMS is divided into three basic prob­ lems: dealing with resource contention

  7. Optimal discrimination between quantum operations

    E-Print Network [OSTI]

    Lvzhou Li; Daowen Qiu

    2007-05-17

    In this paper, we address the problem of discriminating two given quantum operations. Firstly, based on the Bloch representation of single qubit systems, we give the exact minimum error probability of discriminating two single qubit quantum operations by unentangled input states. In particular, for the Pauli channels discussed in [Phys. Rev. A {\\bf 71}, 062340 (2005)], we use a more intuitional and visual method to deal with their discrimination problem. Secondly, we consider the condition for perfect discrimination of two quantum operations. Specially, we get that two generalized Pauli channels are perfectly distinguishable if and only if their characteristic vectors are orthogonal.

  8. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  9. Electromagnetic transitions with effective operators

    E-Print Network [OSTI]

    Ionel Stetcu; Bruce R. Barrett; Petr Navratil; Calvin W. Johnson

    2004-09-30

    In the no-core shell model formalism we compute effective one- and two-body operators, using the Lee-Suzuki procedure within the two-body cluster approximation. We evaluate the validity of the latter through calculations in reduced model spaces. In particular, we test the results for the two-body system and find that indeed the effective operators in the reduced space reproduce the expectation values or transition strengths computed in the full space. On the other hand, the renormalization for operators in the case of 6Li is very weak, suggesting the need for higher-body clusters in computing the effective interaction.

  10. AVESTAR Center for Operational Excellence of Clean Energy Plants

    SciTech Connect (OSTI)

    Zitney, S.E.

    2012-05-01

    To address challenges in attaining operational excellence for clean energy plants, the U.S.Department of Energy’s National Energy Technology Laboratory has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTAR™). The AVESTAR Center brings together state-of-the-art, real time,high-fidelity dynamic simulators with operator training systems and 3D virtual immersive training systems into an integrated energy plant and control room environment. This presentation will highlight the AVESTAR Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission energy plants.

  11. AVESTAR Center for Operational Excellence of Clean Energy Plants

    SciTech Connect (OSTI)

    Zitney, Stephen

    2012-01-01

    To address challenges in attaining operational excellence for clean energy plants, the U.S. Department of Energy's National Energy Technology Laboratory has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTAR{trademark}). The AVESTAR Center brings together state-of-the-art, real time,high-fidelity dynamic simulators with operator training systems and 3D virtual immersive training systems into an integrated energy plant and control room environment. This presentation will highlight the AVESTAR Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission energy plants.

  12. Operational resilience: concepts, design and analysis

    E-Print Network [OSTI]

    Ganin, Alexander A; Gutfraind, Alexander; Steen, Nicolas; Keisler, Jeffrey M; Kott, Alexander; Mangoubi, Rami; Linkov, Igor

    2015-01-01

    Building resilience into today's complex infrastructures is critical to the daily functioning of society and its ability to withstand and recover from natural disasters, epidemics, and cyber-threats. This study proposes quantitative measures that implement the definition of engineering resilience advanced by the National Academy of Sciences. The approach is applicable across physical, information, and social domains. It evaluates the critical functionality, defined as a performance function of time set by the stakeholders. Critical functionality is a source of valuable information, such as the integrated system resilience over a time interval, and its robustness. The paper demonstrates the formulation on two classes of models: 1) multi-level directed acyclic graphs, and 2) interdependent coupled networks. For both models synthetic case studies are used to explore trends. For the first class, the approach is also applied to the Linux operating system. Results indicate that desired resilience and robustness lev...

  13. Operational Signature Schemes Michael Backes

    E-Print Network [OSTI]

    Operational Signature Schemes Michael Backes CISPA, Saarland University ¨Ozg¨ur Dagdelen TU] transferred the idea of functional encryption to signatures. They basically say that, with knowledge

  14. Three essays in operations management

    E-Print Network [OSTI]

    Leung, Ngai-Hang Zachary

    2014-01-01

    The thesis applies optimization theory to three problems in operations management. In the first part of the thesis, we investigate the impact of inventory control on the availability of drugs to patients at public health ...

  15. Operating Efficiency Comes From Teamwork 

    E-Print Network [OSTI]

    Relyea, D. L.; Stone, A.

    1997-01-01

    of the Site's utilities generation and distribution systems, which cross the operating boundaries of all three of the plants in the complex, and supports both capital improvements and long-term energy optimization projects for those systems. INPUTs origins go...

  16. LCLS Operations Schedule January February...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Schedule January February March April May June July August September October November December 2009 Run 1 Oct. 1-Dec. 17 2010 Run 2 Run 3 May 6 - Sep. 13 Oct. 7 - Dec....

  17. Businss Operations Calendar: YY 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Workdays (S BU) Salaried Bargaining Unit WD 253 250 Holidays (Salaried + BU) All cutoff Business Operations Calendar Y12 - FY 2015 (58 Shift) S January 15 M T W T F S...

  18. An operational subsea wireline system

    SciTech Connect (OSTI)

    Dines, C.; Cowan, P.; Headworth, C.

    1989-02-01

    This paper describes an operational subsea wireline system that is self-contained and flexible and offers a safe, economical, and proven method for riserless re-entry into any subsea well.

  19. Formal Specification of Operating System Operations Dan Zhou Paul E. Black

    E-Print Network [OSTI]

    Black, Paul E.

    Formal Specification of Operating System Operations Dan Zhou- fication of a secure operating system architecturepandritsising the objects and* * subjects of operating systems. We security-related operations in higher-orderalogicltheoremso specify security co* *nditions

  20. Transmission eigenvalues for elliptic operators

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-07-03

    A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

  1. Lease Operations Environmental Guidance Document

    SciTech Connect (OSTI)

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  2. Reactor operation safety information document

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  3. SNS LINAC MODULATOR OPERATIONAL HISTORY AND PERFOMANCE

    SciTech Connect (OSTI)

    Peplov, Vladimir V [ORNL; Anderson, David E [ORNL; Cutler, Roy I [ORNL; Hicks, Jim [ORNL; Saethre, Robert B [ORNL; Wezensky, Mark W [ORNL

    2011-01-01

    Fourteen High Voltage Converter Modulators (HVCM) were initially installed at the Spallation Neutron Source Linear Accelerator (SNS Linac) at the Oak Ridge National Laboratory in 2005. A fifteenth HVCM was added in 2009. Each modulator provides a pulse of up to 140 kV at a maximum width of 1.35 msec. Peak power level is 11 MW with an 8% duty factor. The HVCM system must be available for neutron production (NP) 24/7 with the exception being two, 6-week maintenance periods per year. HVCM reliability is one of the most important factors to maximize Linac availability and achieve SNS performance goals. During the last few years several modifications have been implemented to improve the overall system reliability. This paper presents operational history of the HVCM systems and examines failure mode statistical data since the modulators began operating at 60 Hz. System enhancements and upgrades aimed at providing long term reliable operation with minimal down time are also discussed in the paper.

  4. Measuring time with physical clocks

    E-Print Network [OSTI]

    Esteban Castro-Ruiz; Flaminia Giacomini; ?aslav Brukner

    2015-07-07

    In general relativity, the picture of spacetime assigns an ideal clock to each spacetime point. Being ideal, gravitational effects due to these clocks are ignored and the flow of time according to one clock is not affected by the presence of surrounding clocks. However, if time is defined operationally, as a pointer position of a physical clock that obeys the laws of quantum mechanics and general relativity, such a picture is at most a convenient fiction. We show that the mass-energy equivalence implies gravitational interaction between the clocks, while the superposition of energy eigenstates leads to a non-fixed metric background. Based only on the assumption that both quantum mechanics and general relativity are valid in this situation, we show that the clocks necessarily get entangled through time dilation effect, which eventually leads to a loss of coherence of a single clock. Hence, the time as measured by a single clock is not well-defined. However, the general relativistic notion of time is recovered in the classical limit of clocks.

  5. Space time and the passage of time

    E-Print Network [OSTI]

    George F. R. Ellis; Rituparno Goswami

    2012-08-26

    This paper examines the various arguments that have been put forward suggesting either that time does not exist, or that it exists but its flow is not real. I argue that (i) time both exists and flows; (ii) an Evolving Block Universe (`EBU') model of spacetime adequately captures this feature, emphasizing the key differences between the past, present, and future; (iii) the associated surfaces of constant time are uniquely geometrically and physically determined in any realistic spacetime model based in General Relativity Theory; (iv) such a model is needed in order to capture the essential aspects of what is happening in circumstances where initial data does not uniquely determine the evolution of spacetime structure because quantum uncertainty plays a key role in that development. Assuming that the functioning of the mind is based in the physical brain, evidence from the way that the mind apprehends the flow of time prefers this evolving time model over those where there is no flow of time.

  6. Manage Your Time 

    E-Print Network [OSTI]

    White, Lynn

    2000-06-27

    People view time in different ways, but we all could do a better job of managing our time. This publication explains three different time management tools: the 24-hour time log and chart; a self-assessment of thinking styles and time management...

  7. Operating Experience Review of Tritium-in-Water Monitors

    SciTech Connect (OSTI)

    S. A. Bruyere; L. C. Cadwallader

    2011-09-01

    Monitoring tritium facility and fusion experiment effluent streams is an environmental safety requirement. This paper presents data on the operating experience of a solid scintillant monitor for tritium in effluent water. Operating experiences were used to calculate an average monitor failure rate of 4E-05/hour for failure to function. Maintenance experiences were examined to find the active repair time for this type of monitor, which varied from 22 minutes for filter replacement to 11 days of downtime while waiting for spare parts to arrive on site. These data support planning for monitor use; the number of monitors needed, allocating technician time for maintenance, inventories of spare parts, and other issues.

  8. SLH Timing Belt Powertrain

    SciTech Connect (OSTI)

    Schneider, Abe

    2014-04-09

    The main goal of this proposal was to develop and test a novel powertrain solution for the SLH hydroEngine?, a low-cost, efficient low-head hydropower technology. Nearly two-thirds of U.S. renewable electricity is produced by hydropower (EIA 2010). According to the U.S. Department of Energy; this amount could be increased by 50% with small hydropower plants, often using already-existing dams (Hall 2004). There are more than 80,000 existing dams, and of these, less than 4% generate power (Blankinship 2009). In addition, there are over 800 irrigation districts in the U.S., many with multiple, non-power, low-head drops. These existing, non-power dams and irrigation drops could be retrofitted to produce distributed, baseload, renewable energy with appropriate technology. The problem is that most existing dams are low-head, or less than 30 feet in height (Ragon 2009). Only about 2% of the available low-head hydropower resource in the U.S. has been developed, leaving more than 70 GW of annual mean potential low-head capacity untapped (Hall 2004). Natel Energy, Inc. is developing a low-head hydropower turbine that operates efficiently at heads less than 6 meters and is cost-effective for deployment across multiple low-head structures. Because of the unique racetrack-like path taken by the prime-movers in the SLH, a flexible powertrain is required. Historically, the only viable technological solution was roller chain. Despite the having the ability to easily attach blades, roller chain is characterized by significant drawbacks, including high cost, wear, and vibration from chordal action. Advanced carbon-#12;fiber-reinforced timing belts have been recently developed which, coupled with a novel belt attachment system developed by Natel Energy, result in a large reduction in moving parts, reduced mass and cost, and elimination of chordal action for increased fatigue life. The work done in this project affirmatively addressed each of the following 3 major uncertainties concerning a timing-belt based hydroEngine ?powertrain: 1. Can a belt handle the high torques and power loads demanded by the SLH? (Yes.) 2. Can the SLH blades be mounted to belt with a connection that can withstand the loads encountered in operation? (Yes.) 3. Can the belt, with blade attachments, live through the required cyclic loading? (Yes.) The research adds to the general understanding of sustainable small hydropower systems by using innovative system testing to develop and demonstrate performance of a novel powertrain solution, enabling a new type of hydroelectric turbine to be commercially developed. The technical effectiveness of the methods investigated has been shown to be positive through an extensive design and testing process accommodating many constraints and goals, with a major emphasis on high cycle fatigue life. Economic feasibility of the innovations has been demonstrated through many iterations of design for manufacturability and cost reduction. The project is of benefit to the public because it has helped to develop a solution to a major problem -- despite the large available potential for new low-head hydropower, high capital costs and high levelized cost of electricity (LCOE) continue to be major barriers to project development. The hydroEngine? represents a significant innovation, leveraging novel fluid mechanics and mechanical configuration to allow lower-cost turbine manufacture and development of low head hydropower resources.

  9. 756 IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, VOL. 4, NO. 3, JULY 2013 Minimization of Wind Farm Operational

    E-Print Network [OSTI]

    Kusiak, Andrew

    turbines installed at a wind farm. Wind turbine index. Grid demand at time . Power generated by wind turbine at time . Expected power generated by wind turbine at time window . Average wind speed at time price at time . Power shortage (demand minus generated wind power) at time . Levelized unit operations

  10. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect (OSTI)

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  11. operations

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia4) August 20123/%2A en46Afedkcp8/%2A en0/%2A8/%2A

  12. Characterizing Multiple Solutions to the Time-Energy Canonical Commutation Relation via Quantum Dynamics

    E-Print Network [OSTI]

    Roland Cristopher F. Caballar; Eric A. Galapon

    2010-05-14

    We address the multiplicity of solutions to the time-energy canonical commutation relation for a given Hamiltonian. Specifically, we consider a particle spatially confined in a potential free interval, where it is known that two distinct self-adjoint and compact time operators conjugate to the system Hamiltonian exist. The dynamics of the eigenvectors of these operators indicate that different time operators posses distinguishing properties that can unambiguously associate them to specific aspects of the quantum time problem.

  13. Operations, OPS, Accelerator and Beam Science, ABS, Accelerator Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperatingBusiness Operations »and

  14. Using convolutional decoding to improve time delay and phase estimation in digital communications

    DOE Patents [OSTI]

    Ormesher, Richard C. (Albuquerque, NM); Mason, John J. (Albuquerque, NM)

    2010-01-26

    The time delay and/or phase of a communication signal received by a digital communication receiver can be estimated based on a convolutional decoding operation that the communication receiver performs on the received communication signal. If the original transmitted communication signal has been spread according to a spreading operation, a corresponding despreading operation can be integrated into the convolutional decoding operation.

  15. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  16. Performance Prediction through Time Measurements Roman Iakymchuk

    E-Print Network [OSTI]

    of predicting performance of linear algebra algorithms for small matrices. This approach is based on reducing linear algebra operations such as the BLAS subroutines. As the time measurements confirmed, the execution is built on top of two BLAS subroutines, with the separately measured one. The applicability

  17. Performing a local barrier operation

    DOE Patents [OSTI]

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  18. Performing a local barrier operation

    DOE Patents [OSTI]

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value of the counter, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  19. Twenty Years of Tevatron Operation

    SciTech Connect (OSTI)

    Jay C. Theilacker

    2004-07-15

    The superconducting Tevatron accelerator at Fermi National Accelerator Laboratory (Fermilab) has surpassed twenty years of operation. The Tevatron is still the highest energy particle accelerator in the world and will remain so until the commissioning of the LHC in Europe later this decade. The Tevatron has operated in a Fixed Target mode, accelerating a proton beam into stationary targets/detectors, as well as a Colliding Beam mode, continuously colliding counter rotating beams of protons and antiprotons. Upon completion, the Tevatron cryogenic system became the world's largest helium refrigeration system. In 1993, the Tevatron cryogenic system was given the designation of International Historic Mechanical Engineering Landmark by the American Society of Mechanical Engineers. The operational history, experiences and statistics of the Tevatron, with an emphasis on the cryogenic system, is presented. Improvements, upgrades and current challenges of the cryogenic system are discussed.

  20. Southern Illinois University Watercraft & Equipment Operating Boat Operation Eligibility

    E-Print Network [OSTI]

    hitch forming an "X" with chains 4. Plug trailer lights into truck receptacle, and check to make sure. Unplug trailer lights from truck 2. Remove safety chain, and loosen winch on front eyelet 3. Remove motors, a first aid kit, and proper running lights if operating in low light conditions. SIUC

  1. Tensor Products of Operator Systems Mark Tomforde

    E-Print Network [OSTI]

    Kerr, David

    Tensor Products of Operator Systems Mark Tomforde (Joint work with Ali Kavruk, Vern Paulsen Tomforde (Univeristy of Houston) Tensor Products of Operator Systems October 19, 2009 1 / 37 #12;Operator Spaces and Operator Systems An operator space is a subspace of B(H). Mark Tomforde (Univeristy of Houston

  2. Call for Papers Annals of Operations Research

    E-Print Network [OSTI]

    Call for Papers Annals of Operations Research Special Volume: Operations Research Confronting the Crisis The Annals of Operations Research seeks submissions for a special volume on Operations Research opportunities have arisen for the development and application of operations research (OR) methodologies

  3. Medium energy heavy ion operations at RHIC

    SciTech Connect (OSTI)

    Drees, K.A.; Ahrens, L.; Bai, M.; Beebe-Wang, J.; Blackler, I.M.C.; Blaskiewicz, M.; Brown, K.A.; Brennan, M.; Bruno, D.; Butler, J.; Carlson, C.; Connolly, R.; D'Ottavio, T.; Fischer, W.; Fu, W.; Gassner, D.; Harvey, M.; Hayes, T.; Huang, H.; Hulsart, R.; Ingrassia, P.; Kling, N.; Lafky, M.; Laster, J.; Lee, R.C.; Litvinenko, V.; Luo, Y.; MacKay, W.W.; Marr, G.; Mapes. M.; Marusic, A.; Mernick, K.; Michnoff, R.; Minty, M.; Montag, C.; Morris, J.; Naylor, C.; Nemesure, S.; Pilat, F.; Ptitsyn, V.; Robert-Demolaize, G.; Roser, T.; Sampson, P.; Satogata, T.; Schoefer, V.; Schultheiss, C.; Severino, F.; Shrey, T.; Smith, K.S.; Tepikian, S.; Thieberger, P.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J.; van Kuik, B.; Wilinski, M.; Zaltsman, A.; Zeno, K.; Zhang, S.Y.

    2011-03-28

    As part of the search for a phase transition or critical point on the QCD phase diagram, an energy scan including 5 different energy settings was performed during the 2010 RHIC heavy ion run. While the top beam energy for heavy ions is at 100 GeV/n and the lowest achieved energy setpoint was significantly below RHICs injection energy of approximately 10 GeV/n, we also provided beams for data taking in a medium energy range above injection energy and below top beam energy. This paper reviews RHIC experience and challenges for RHIC medium energy operations that produced full experimental data sets at beam energies of 31.2 GeV/n and 19.5 GeV/n. The medium energy AuAu run covered two beam energies, both above the RHIC injection energy of 9.8 GeV but well below the standard store energy of 100 GeV (see table 1). The low energy and full energy runs with heavy ions in FY10 are summarized in [1] and [2]. Stochastic Cooling ([3]) was only used for 100 GeV beams and not used in the medium energy run. The efficiency of the transition from 100 GeV operation to 31.2 GeV and then to 19.5 GeV was remarkable. Setup took 32 h and 19 h respectively for the two energy settings. The time in store, defined to be the percentage of time RHIC provides beams in physics conditions versus calendar time, was approximately 52% for the entire FY10 heavy ion run. In both medium energy runs it was well above this average, 68% for 31.5 GeV and 82% for 19.5 GeV. For both energies RHIC was filled with 111 bunches with 1.2 10{sup 9} and 1.3 10{sup 9} ions per bunch respectively.

  4. Forward Analysis of Updatable Timed Automata Patricia BOUYER

    E-Print Network [OSTI]

    Doyen, Laurent

    , widening operator, correctness, data structure 1 Introduction Real-Time Systems. Since their introduction by Alur and Dill in [AD90,AD94], timed automata are one of the most studied models for real-time systems94], minimiza- tion [ACD+ 92], power of clocks [ACH94,HKWT95], power of -transitions [BDGP98

  5. Forward Analysis of Updatable Timed Automata Patricia B#####

    E-Print Network [OSTI]

    Doyen, Laurent

    , widening operator, correctness, data structure 1 Introduction Real­Time Systems. Since their introduction by Alur and Dill in [AD90,AD94], timed automata are one of the most studied models for real­time systems [AFH94], minimiza­ tion [ACD + 92], power of clocks [ACH94,HKWT95], power of #­transitions [BDGP98

  6. NIST Special Publication 250-59 NIST Computer Time Services

    E-Print Network [OSTI]

    . Technical Description of Internet Time Service 6 A. Technical Description of Hardware 6 1. Computer Systems. Authentication of Time Signals 30 III. Operational Procedures of Internet Time Service 31 A. Hardware Maintenance 32 a) Total hardware failure 32 b) Partial hardware failure 32 c) Other failure modes 33 D. Record

  7. High resolution time interval counter

    DOE Patents [OSTI]

    Condreva, K.J.

    1994-07-26

    A high resolution counter circuit measures the time interval between the occurrence of an initial and a subsequent electrical pulse to two nanoseconds resolution using an eight megahertz clock. The circuit includes a main counter for receiving electrical pulses and generating a binary word--a measure of the number of eight megahertz clock pulses occurring between the signals. A pair of first and second pulse stretchers receive the signal and generate a pair of output signals whose widths are approximately sixty-four times the time between the receipt of the signals by the respective pulse stretchers and the receipt by the respective pulse stretchers of a second subsequent clock pulse. Output signals are thereafter supplied to a pair of start and stop counters operable to generate a pair of binary output words representative of the measure of the width of the pulses to a resolution of two nanoseconds. Errors associated with the pulse stretchers are corrected by providing calibration data to both stretcher circuits, and recording start and stop counter values. Stretched initial and subsequent signals are combined with autocalibration data and supplied to an arithmetic logic unit to determine the time interval in nanoseconds between the pair of electrical pulses being measured. 3 figs.

  8. High resolution time interval counter

    DOE Patents [OSTI]

    Condreva, Kenneth J. (Livermore, CA)

    1994-01-01

    A high resolution counter circuit measures the time interval between the occurrence of an initial and a subsequent electrical pulse to two nanoseconds resolution using an eight megahertz clock. The circuit includes a main counter for receiving electrical pulses and generating a binary word--a measure of the number of eight megahertz clock pulses occurring between the signals. A pair of first and second pulse stretchers receive the signal and generate a pair of output signals whose widths are approximately sixty-four times the time between the receipt of the signals by the respective pulse stretchers and the receipt by the respective pulse stretchers of a second subsequent clock pulse. Output signals are thereafter supplied to a pair of start and stop counters operable to generate a pair of binary output words representative of the measure of the width of the pulses to a resolution of two nanoseconds. Errors associated with the pulse stretchers are corrected by providing calibration data to both stretcher circuits, and recording start and stop counter values. Stretched initial and subsequent signals are combined with autocalibration data and supplied to an arithmetic logic unit to determine the time interval in nanoseconds between the pair of electrical pulses being measured.

  9. On Time. 6b: Quantum Mechanical Time

    E-Print Network [OSTI]

    C. K. Raju

    2008-08-09

    The existence of small amounts of advanced radiation, or a tilt in the arrow of time, makes the basic equations of physics mixed-type functional differential equations. The novel features of such equations point to a microphysical structure of time. This corresponds to a change of logic at the microphysical level. We show that the resulting logic is a quantum logic. This provides a natural and rigorous explanation of quantum interference. This structured-time interpretation of quantum mechanics is briefly compared with various other interpretations of q.m.

  10. Transforming Power Grid Operations via High Performance Computing

    SciTech Connect (OSTI)

    Huang, Zhenyu; Nieplocha, Jarek

    2008-07-31

    Past power grid blackout events revealed the adequacy of grid operations in responding to adverse situations partially due to low computational efficiency in grid operation functions. High performance computing (HPC) provides a promising solution to this problem. HPC applications in power grid computation also become necessary to take advantage of parallel computing platforms as the computer industry is undergoing a significant change from the traditional single-processor environment to an era for multi-processor computing platforms. HPC applications to power grid operations are multi-fold. HPC can improve today’s grid operation functions like state estimation and contingency analysis and reduce the solution time from minutes to seconds, comparable to SCADA measurement cycles. HPC also enables the integration of dynamic analysis into real-time grid operations. Dynamic state estimation, look-ahead dynamic simulation and real-time dynamic contingency analysis can be implemented and would be three key dynamic functions in future control centers. HPC applications call for better decision support tools, which also need HPC support to handle large volume of data and large number of cases. Given the complexity of the grid and the sheer number of possible configurations, HPC is considered to be an indispensible element in the next generation control centers.

  11. Operation Periods: Single Column Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oak Ridge'sOPERATING2

  12. Operational Controls for Balancing Reserves

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oak Ridge'sOPERATING2

  13. Operations Division at Berkeley Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating Oakoak ridge 12Operations

  14. Operations start and shipments begin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access toOctober 1996Technologies /JuneOperating OakoakOperations

  15. Reactor control rod timing system. [LMFBR

    DOE Patents [OSTI]

    Wu, P.T.K.

    1980-03-18

    A fluid driven jet-edge whistle timing system is described for control rods of a nuclear reactor for producing real-time detection of the timing of each control rod in its scram operation. An important parameter in reactor safety, particularly for liquid metal fast breeder reactors (LMFBR), is the time deviation between the time the control rod is released and the time the rod actually reaches the down position. The whistle has a nearly pure tone signal with center frequency (above 100 kHz) far above the frequency band in which the energy of the background noise is concentrated. Each control rod can be fitted with a whistle with a different frequency so that there is no ambiguity in differentiating the signal from each control rod.

  16. Human Factors for Situation Assessment in Grid Operations

    SciTech Connect (OSTI)

    Guttromson, Ross T.; Schur, Anne; Greitzer, Frank L.; Paget, Mia L.

    2007-08-08

    Executive Summary Despite advances in technology, power system operators must assimilate overwhelming amounts of data to keep the grid operating. Analyses of recent blackouts have clearly demonstrated the need to enhance the operator’s situation awareness (SA). The long-term objective of this research is to integrate valuable technologies into the grid operator environment that support decision making under normal and abnormal operating conditions and remove non-technical barriers to enable the optimum use of these technologies by individuals working alone and as a team. More specifically, the research aims to identify methods and principles to increase SA of grid operators in the context of system conditions that are representative or common across many operating entities and develop operationally relevant experimental methods for studying technologies and operational practices which contribute to SA. With increasing complexity and interconnectivity of the grid, the scope and complexity of situation awareness have grown. New paradigms are needed to guide research and tool development aimed to enhance and improve operations. In reviewing related research, operating practices, systems, and tools, the present study established a taxonomy that provides a perspective on research and development surrounding power grid situation awareness and clarifies the field of human factors/SA for grid operations. Information sources that we used to identify critical factors underlying SA included interviews with experienced operational personnel, available historical summaries and transcripts of abnormal conditions and outages (e.g., the August 14, 2003 blackout), scientific literature, and operational policies/procedures and other documentation. Our analysis of August 2003 blackout transcripts and interviews adopted a different perspective than previous analyses of this material, and we complemented this analysis with additional interviews. Based on our analysis and a broad literature review, we advocate a new perspective on SA in terms of sensemaking, also called situated or ecological decision making, where the focus of the investigation is to understand why the decision maker(s) experienced the situation the way they did, or why what they saw made sense to them at the time. This perspective is distinct from the traditional branch of human factors research in the field which focuses more on ergonomics and the transactional relationship between the human operator and the systems. Consistent with our findings from the literature review, we recognized an over-arching need to focus SA research on issues surrounding the concept of shared knowledge; e.g., awareness of what is happening in adjacent areas as well as one’s own area of responsibility. Major findings were: a) Inadequate communication/information sharing is pervasive, b) Information is available, but not used. Many tools and mechanisms exist for operators to build awareness of the physical grid system, yet the transcripts reveal that they still need to call and exchange information with operators of neighboring areas to improve or validate their SA. The specific types of information that they request are quite predictable and, in most cases, cover information that could be available to both operators and reliability coordinators through readily available displays or other data sources, c) Shared Knowledge is Required on Operations/Actions as Well as Physical Status. In an ideal, technologically and organizationally perfect world, every control room and every reliability coordinator may have access to complete data across all regional control areas and yet, there would still be reason for the operators to call each other to gain and improve their SA of power grid operations, and d) Situation Awareness as sensemaking and shared knowledge.

  17. Use of look-ahead modeling in pipeline operations

    SciTech Connect (OSTI)

    Wray, B.; O`Leary, C.

    1995-12-31

    Amoco Canada Petroleum Company, Ltd. operates the Cochin pipeline system. Cochin pumps batched liquid ethane, propane, ethylene, butane, and NGL. Operating and scheduling this pipeline is very complex. There are safety considerations, especially for ethylene, which cannot be allowed to drop below vapor pressure. Amoco Canada needs to know where batches are in the line, what pressure profiles will look like into the future, and when batches arrive at various locations along the line. In addition to traditional instrumentation and SCADA, Amoco Canada uses modeling software to help monitor and operate the Cochin pipeline. Two important components of the modeling system are the Estimated Time of Arrival (ETA) and Predictive Model (PM) modules. These modules perform look ahead modeling to assist in operating the Cochin pipeline. The modeling software was first installed for the Cochin system in February of 1994, and was commissioned on August 1, 1994. This paper will discuss how the look ahead modules are used for the Cochin pipeline.

  18. A Sensemaking Perspective on Situation Awareness in Power Grid Operations

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Schur, Anne; Paget, Mia L.; Guttromson, Ross T.

    2008-07-21

    With increasing complexity and interconnectivity of the electric power grid, the scope and complexity of grid operations continues to grow. New paradigms are needed to guide research to improve operations by enhancing situation awareness of operators. Research on human factors/situation awareness is described within a taxonomy of tools and approaches that address different levels of cognitive processing. While user interface features and visualization approaches represent the predominant focus of human factors studies of situation awareness, this paper argues that a complementary level, sensemaking, deserves further consideration by designers of decision support systems for power grid operations. A sensemaking perspective on situation aware-ness may reveal new insights that complement ongoing human factors research, where the focus of the investigation of errors is to understand why the decision makers experienced the situation the way they did, or why what they saw made sense to them at the time.

  19. Remote implementation of partially unknown operations and its entanglement costs

    E-Print Network [OSTI]

    Shu-Hui Luo; An-Min Wang

    2013-01-24

    We present the generalized version of Wang's protocol[A.M.Wang, Phys.Rev.A 74,032317 (2006)] for the remote implementation(sometimes referred to as quantum remote control) of partially unknown quantum operations. The protocol only requires no more than half of the entanglements used in Bidirectional Quantum State Teleportation. We also propose a protocol for another form of quantum remote control. It can remotely implement a unitary operation which is a combination of the projective representations of a group. Moreover, we prove that the Schmidt rank of the entanglements cannot not be less than the number of controlled parameters of the operations, which for the first time gives a lower bound on entanglement costs in remote implementation of quantum operations.

  20. Awarded Products Maintenance, Repair & Operations TOOLS & HARDWARE

    E-Print Network [OSTI]

    California at San Diego, University of

    Awarded Products Maintenance, Repair & Operations (MRO): TOOLS & HARDWARE Such as hand and power tools, cutting tools, fasteners, etc. Maintenance, Repair & Operations (MRO): TOOLS & HARDWARE Such as hand and power tools, cutting tools, fasteners, etc. Maintenance, Repair & Operations (MRO): TOOLS

  1. Operating strategy generators for nuclear reactors

    SciTech Connect (OSTI)

    Solovyev, D. A., E-mail: and@est.mephi.ru; Semenov, A. A.; Shchukin, N. V. [National Research Nuclear University MEPhI (Russian Federation)

    2011-12-15

    Operating strategy generators, i.e., the software intended for increasing the efficiency of work of nuclear power plant operators, are discussed. The possibilities provided by the domestic and foreign operating-strategy generators are analyzed.

  2. COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT

    E-Print Network [OSTI]

    Sin, Peter

    COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT _________________________________________________________ Applicants for positions involving the operation of a commercial motor vehicle must comply with Title 49 CFR: _______________ Please list the following information for each unexpired commercial motor vehicle operator license

  3. CCCaaallllll fffooorrr PPPaaapppeeerrrsss Annals of Operations Research

    E-Print Network [OSTI]

    CCCaaallllll fffooorrr PPPaaapppeeerrrsss Annals of Operations Research Special Volume: Sustainable Human Environments and Operations Research _______________________________________________________ The Annals of Operations Research seeks submissions for a special volume on Sustainable Human Environments

  4. Global Optimization for Scheduling Refinery Crude Oil Operations Ramkumar Karuppiaha

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    Global Optimization for Scheduling Refinery Crude Oil Operations Ramkumar Karuppiaha , Kevin C of a nonconvex Mixed Integer Nonlinear Programming (MINLP) model for the scheduling of crude oil movement of crude oil and products. Furthermore, detailed scheduling models often require a continuous time

  5. Model Predictability-Form Lorenz System to Operational Ocean and

    E-Print Network [OSTI]

    Chu, Peter C.

    Model Predictability- Form Lorenz System to Operational Ocean and Atmospheric Models Peter C Chu. Poberezhny, 2002: Power law decay in model predictability skill. Geophysical Research Letters, 29 (15), 10 Six Months Four-Times Daily Data From July 9, 1998 for Verification #12;Model Generated Velocity

  6. Earthquake Seismographs for Volunteers to Operate in K-12

    E-Print Network [OSTI]

    Earthquake Seismographs for Volunteers to Operate in K-12 Classrooms Wayne D. Pennington Shannon E development and features · Where we're headed #12;Purpose · To provide low-cost earthquake seismographs that earthquakes can be identified from global observations. Today's date Local Time Surface Waves P-Wave The most

  7. Operation Ivy. Report to the Scientific Director. Documentary photography

    SciTech Connect (OSTI)

    Gaylord, J.L.

    1985-09-01

    The objective of Task Unit 9 was to record on film, both still and motion picture, the activities connected with certain events and programs of Operation Ivy. Task Unit 9 accomplished all the necessary field photography and was still in the process of editing this footage to form a completed motion-picture record at the time this report was written.

  8. Vehicle to Grid -A Control Area Operators Perspective

    E-Print Network [OSTI]

    Firestone, Jeremy

    Mexico Nav Glen Four Corners NM Coal Hydro Gas Wind Other Palo Verde AZ Market- place S. NV #12;#12;Key ISO Roles · Frequency Monitoring & Time Error Control · Scheduling of Power Transfers · Grid Planning of experience in dealing with Distributed Resources #12;Wireless Provider Grid Operator Power Command Power

  9. Optimal operation of a mixed fluid cascade LNG process

    E-Print Network [OSTI]

    Skogestad, Sigurd

    Optimal operation of a mixed fluid cascade LNG process Jørgen Bauck Jensen & Sigurd Skogestad distances is to first produce liquefied natural gas (LNG) and then transport the LNG by ships. At atmospheric pressure LNG has approximately 600 times the density of gaseous NG and a temperature of ap

  10. Operation and Control of Full Ice-storage System 

    E-Print Network [OSTI]

    Liu, Q.; Liu, Y.

    2006-01-01

    In a dividing time ice-storage system, the refrigerator does not operate during power's on-peak period, and all the cooling is supplied by the ice stored in off-peak period, so that the use of electricity can be maintained. When the ice is thawing...

  11. Hamilton-Jacobi theory and the evolution operator

    E-Print Network [OSTI]

    J. F. Carinena; X. Gracia; E. Martinez; G. Marmo; M. C. Munoz-Lecanda; N. Roman-Roy

    2009-07-06

    We present a new setting of the geometric Hamilton-Jacobi theory by using the so-called time-evolution operator K. This new approach unifies both the Lagrangian and the Hamiltonian formulation of the problem developed in a previous paper [7], and can be applied to the case of singular Lagrangian dynamical systems.

  12. Operations Research Mathematics College of Science MATH-BS

    E-Print Network [OSTI]

    Kihara, Daisuke

    Operations Research Mathematics College of Science MATH-BS Code-MAOR Departmental/Program Major To Time Series (3) MA 35300 Linear Algebra II With Applications (3) Math Selective I: MA 36200 Topics 51700 - Statistical Inference (3) Math Selective II: MA 37500 - Introduction To Discrete Mathematics /MA

  13. Efficiently Operating Wireless Nodes Powered by Renewable Energy Sources

    E-Print Network [OSTI]

    Gautam, Natarajan

    1 Efficiently Operating Wireless Nodes Powered by Renewable Energy Sources Natarajan Gautam Senior. The node uses energy harvesting in the sense that it is powered by batteries that are charged by renewable that is responsible for transmitting messages in a timely manner while being prudent about energy consumption

  14. Generalized Dirac operators and superconnections

    E-Print Network [OSTI]

    G. Roepstorff; Ch. Vehns

    1999-11-04

    Motivated by the supersymmetric version of Dirac's theory, chiral models in field theory, and the quest of a geometric fundament for the Standard Model, we describe an approach to the differential geometry of vector bundles on (semi)-Riemannian manifolds based on the concepts of superspaces, superalgebras, superconnections, and generalized Dirac operators. In doing so we stay within the realm of commutative geometry.

  15. Campus Safety Standard Operating Procedure

    E-Print Network [OSTI]

    Miami, University of

    /01/13 PURPOSE To establish policies and procedures for motor vehicle parking and operation on Rosenstiel School of Marine and Atmospheric Science Campus. POLICY All non-commercial vehicles parking on the RSMAS Campus in conflict with this procedure are revoked. 1.0 GENERAL 1.1 Motor vehicles are considered parked when stopped

  16. VICE PRESIDENT FINANCE, RESOURCES & OPERATIONS

    E-Print Network [OSTI]

    Handy, Todd C.

    VICE PRESIDENT FINANCE, RESOURCES & OPERATIONS PIERRE OUILLET EA to VP Carolina Cerna ASSOCIATE VP ADMINISTRATION & FINANCE OKANAGAN CAMPUS Jackie Podger Michael Shakespeare (Interim) ASSOCIATE VP CAMPUS Dennis Silva FINANCE UBCO Carla Waters FINANCE UBCO Carla Waters BUDGET AND MGMT REPORTING Andrew Glynn

  17. Richland Operations Office technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  18. Auditing of Programs and Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-11-09

    To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Supersedes DOE O 224.2.

  19. Auditing of Programs and Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-22

    To set forth audit responsibilities for the promotion of economy and efficiency in the administration of, or the prevention or detection of fraud, waste, and abuse in, programs and operations of the Department of Energy (DOE). Cancels DOE 2321.1B. Canceled by DOE O 224.2A.

  20. COE1 Calorimeter Operations Manual

    SciTech Connect (OSTI)

    Santi, Peter Angelo

    2015-12-15

    The purpose of this manual is to describe the operations of the COE1 calorimeter which is used to measure the thermal power generated by the radioactive decay of plutonium bearing materials for the purposes of assaying the amount of plutonium within the material.