National Library of Energy BETA

Sample records for tests completed successfully

  1. B61-12 Life Extension Program Radar Drop Tests Completed Successfully |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) B61-12 Life Extension Program Radar Drop Tests Completed Successfully August 29, 2013 WASHINGTON, D.C. - As part of the ongoing effort to refurbish the aging B61 nuclear bomb without resorting to underground nuclear testing, two successful B61-12 radar drop tests were successfully completed at the Tonopah Test Range in Nevada on Aug. 14 and 15, 2013, by engineers from Sandia National Laboratories. Current B61s use decades-old vacuum tubes as

  2. DOE Partnership Completes Successful CO2 Injection Test in the Mount Simon Sandstone

    Broader source: Energy.gov [DOE]

    The Midwest Regional Carbon Sequestration Partnership, one of seven partnerships in the U.S. Department of Energy's Regional Carbon Sequestration Partnerships program, has successfully injected 1,000 metric tons of carbon dioxide (CO2) into the Mount Simon Sandstone, a deep saline formation that is widespread across much of the Midwest.

  3. NNSA, LANL Complete DARHT Improvements With Successful Multi...

    National Nuclear Security Administration (NNSA)

    NNSA, LANL Complete DARHT Improvements With Successful Multi-frame Hydrodynamic Test ... (LANL) Dual Axis Radiographic Hydrodynamic Test (DARHT) facility has completed another ...

  4. JEA successfully completes world's largest CFB demonstration

    SciTech Connect (OSTI)

    2005-09-30

    JEA (formerly the Jacksonville Electric Authority) has successfully completed an eighth year landmark demonstration project that continues in baseload commercial operation. It scales up atmospheric fluidized-bed technology demonstration to the near-300-MW size, providing important data on a technology that can achieve > 90% SO{sub 2} removal and 60% NOx reduction at relatively high efficiencies and at costs comparable to those of conventional pulverized coal plants. The article recounts the history of the project. Performance tests showed a blend of coal and petcoke were most efficient as a feedstock. 3 figs.

  5. Successful horizontal completions require an integrated approach

    SciTech Connect (OSTI)

    Richard, B.; Smejkal, K.; Penberthy, W. Jr.

    1997-01-01

    While a perfect well completion may not exist, depleting a hydrocarbon resource at a sustained high rate--without a workover--is the ultimate goal. Unfortunately, many horizontal well completions fail to achieve this due to wellbore damage or loss of reservoir pressure. These conditions manifest themselves in reduced production rates, extended well life and reduced profitability. Standard completion techniques are not always compatible with each other for site specific well applications. The combination of two incompatible technologies or slight changes in a completion procedure may negatively impact productivity. Hence, the most successful horizontal completion results are obtained using a compatible integrated system approach--an approach that carefully combines the best completion tools and processes to deliver an undamaged well completed at the lowest possible cost. After studying the compatibilities of various drill-in fluids, screens, filter cakes and gravel packs, recommended procedures are presented for successfully completing horizontal wells.

  6. U.S. Geothermal Announces Successful Completion | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Geothermal Announces Successful Completion U.S. Geothermal Announces Successful Completion July 10, 2008 - 3:45pm Addthis BOISE, Idaho - July 10, 2008 (AMEX: HTM, TSX: GTH) U.S. Geothermal Inc. ("U.S. Geothermal"), a renewable energy company focused on the production of electricity from geothermal energy, announced today that the first full size production well (NHS-1) at the Neal Hot Springs Project was successfully completed on May 23 and an initial flow test confirms the

  7. NNSA, Air Force Complete Successful B61-12 Life Extension Program...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range November 16, 2015 WASHINGTON - The National Nuclear Security ...

  8. NNSA Successfully Completes W87 Refurbishment | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Successfully Completes W87 Refurbishment NNSA Successfully Completes W87 Refurbishment Amarillo TX NNSA announced the successful completion at the Pantex Plant outside of Amarillo, Texas, of efforts to refurbish the W87 nuclear warhead and extend its life by 30 years. This marks the end of the first leg of NNSA's program to ensure that the nation's aging nuclear weapons stockpile is capable of meeting national defense requirements without producing new warheads or

  9. U.S. Geothermal Announces Successful Completion of First Well...

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Announces Successful Completion of First Well at Neal Hot Springs Abstract...

  10. U.S. Geothermal Completes Second Successful Production Well at...

    Open Energy Info (EERE)

    Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Completes Second Successful Production Well at Neal Hot Springs Project...

  11. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  12. U.S. and Japan Complete Successful Field Trial of Methane Hydrate...

    Energy Savers [EERE]

    completion of a successful, unprecedented test of technology in the North Slope of Alaska ... Building upon this initial, small-scale test, the Department is launching a new research ...

  13. U.S. and Japan Complete Successful Field Trial of Methane Hydrate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Technologies | Department of Energy and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies U.S. and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies May 2, 2012 - 1:00pm Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today the completion of a successful, unprecedented test of technology in the North Slope of Alaska that was able to safely extract a steady flow of natural gas from methane hydrates -

  14. Field installation proves coiled tubing ESP completions successful

    SciTech Connect (OSTI)

    Tovar, J.J.; Head, P.; Jordan, R.

    1995-06-01

    Coiled tubing (CT) technology has contributed new and innovative solutions for wells using electrical submersible pumps (ESP). A CT-ESP deployment system was developed as part of a joint industry project to take advantage of this new technology. Ten oil and service companies and the EEC, under the Thermie program, participated in its development. Two main areas were identified to introduce these innovations. The first was deployment and well control. This area has a great impact on the safety and operational aspects of installing and servicing ESPs. The second is cost. As ESPs are considered for new field developments and recompletion of old fields, installation and workover costs play a major role in the selection of completion alternatives. One of the main limitations of ESPs in the past has been the economics of installation and uncertainty about pump life. With focus in these two major areas, a system was successfully produced that offers considerable advantages over existing technologies. The reduction in rig time and equipment cost makes this alternative very attractive for areas where technical and economic obstacles such as live well deployment and high operating cost limit the use of ESP technology. Two field tests have been carried successfully during the development of this system.

  15. Innovative Drivetrain Testing Nears Completion

    Broader source: Energy.gov [DOE]

    National laboratory researchers have entered the final phase of testing a next-generation drivetrain that will be less expensive, more reliable, and more efficient. This project, funded by the U.S....

  16. NNSA, Air Force Complete Successful B61-12 Life Extension Program

    National Nuclear Security Administration (NNSA)

    Development Flight Test at Tonopah Test Range | National Nuclear Security Administration | (NNSA) NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range November 16, 2015 WASHINGTON - The National Nuclear Security Administration (NNSA) and United States Air Force completed the third development flight test of a non-nuclear B61-12 nuclear gravity bomb at Tonopah Test Range in Nevada on October 20, 2015. "This demonstration of

  17. NNSA, Air Force Complete Successful B61-12 Life Extension Program

    National Nuclear Security Administration (NNSA)

    Instrumented Flight Tests | National Nuclear Security Administration | (NNSA) Instrumented Flight Tests February 09, 2015 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) and United States Air Force completed eight successful B61-12 Life Extension Program (LEP) Vibration Fly Around/ Instrumented Measurement Vehicle (VFA/IMV) tests at Eglin Air Force Base and Edwards Air Force Base during July to December 2014.The VFA/IMV test series collected and verified flight

  18. First Thermonuclear Device Successfully Tested | National Nuclear...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline First Thermonuclear Device Successfully Tested First...

  19. DOE's New Large Blade Test Facility in Massachusetts Completes...

    Office of Environmental Management (EM)

    DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade ...

  20. Sandia Energy - Unmanned Aircraft Test Flights Completed at Oliktok...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unmanned Aircraft Test Flights Completed at Oliktok Point Home Climate News News & Events Monitoring Sensing Sensing & Monitoring Unmanned Aircraft Test Flights Completed at...

  1. Slant hole completion test. Final report

    SciTech Connect (OSTI)

    Mann, R.L.

    1993-07-01

    One of the Department of Energy`s (DOE) Strategies and Objectives in the Natural Gas Program is to conduct activities to transfer technology from R&D programs to potential users. The Slant Hole Completion Test has achieved exactly this objective. The Slant Hole site is essentially the same as the Multiwell site and is located in the southeastern portion of the Piceance Basin near Rifle, Colorado. The Piceance Basin is typical of the Western low permeability basins that contain thick sequences of sands, silts and coals deposited during the Cretaceous period. These sequences contain vast amounts of natural gas but have proven to be resistant to commercial production because of the low permeability of the host rocks. Using the knowledge gained from the DOE`s earlier Multiwell experiment, the SHCT-1 was drilled to demonstrate that by intersecting the natural fractures found in these ``tight rocks,`` commercial gas production can be obtained.

  2. Geothermal Well Completion Tests | Open Energy Information

    Open Energy Info (EERE)

    and immediately after drilling activities are completed. Author Hagen Hole Conference Petroleum Engineering Summer School; Dubrovnik, Croatia; 20080609 Published NA, 2008 DOI...

  3. Solar Test Facility Upgrades Complete, Leading to Better Sandia...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support Power ... Applications National Solar Thermal Test Facility Nuclear Energy Systems ...

  4. First Plutonium Bomb Successfully Tested | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Plutonium Bomb Successfully Tested First Plutonium Bomb Successfully Tested Los Alamos, NM Los Alamos scientists successfully test a plutonium implosion bomb in the Trinity shot at Alamogordo, New Mexico

  5. DOE's New Large Blade Test Facility in Massachusetts Completes First

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commercial Blade Tests | Department of Energy DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests December 19, 2011 - 3:15pm Addthis This is an excerpt from the Fourth Quarter 2011 edition of the Wind Program R&D Newsletter. Since opening its doors for business in May, the Wind Technology Testing Center (WTTC), in Boston, Massachusetts, has come up to full

  6. AMO Announces Successful Completion of Industrial-Scale Combined Heat, Hydrogen, and Power System

    Office of Energy Efficiency and Renewable Energy (EERE)

    AMO recently joined with FuelCell Energy of Danbury, CT to celebrate the completion of their successful partnership project at their Torrington, CT manufacturing plant. In addition to the...

  7. NNSA Completes its Critical Radar Arming and Fuzing Test for...

    National Nuclear Security Administration (NNSA)

    and Fuzing Test for the W88 ALT 370 September 25, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) recently completed an important test for the W88 ...

  8. EERE Success Story-Pilot Plant Completes Two 1,000-Hour Ethanol

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Runs | Department of Energy Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs EERE Success Story-Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs January 22, 2016 - 11:01am Addthis ICM Inc. announced successful completion of two 1,000-hour performance runs of its patent-pending Generation 2.0 Co-Located Cellulosic Ethanol process at its cellulosic ethanol pilot plant in St. Joseph, Missouri. This is an important step toward the commercialization of

  9. Sandia completes major overhaul of key nuclear weapons test facilities |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) completes major overhaul of key nuclear weapons test facilities Tuesday, May 13, 2014 - 2:46pm Sandia National Laboratories recently completed the renovation of five large-scale test facilities that are crucial to ensuring the safety and reliability of the nation's nuclear weapons systems. The work supports Sandia's ongoing nuclear stockpile modernization work on the B61-12 and W88 Alt, assessments of current stockpile systems, and test and

  10. "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5,000 Cubic Meters of Nuclear Waste to WIPP | Department of Energy "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP With the American Recovery and Reinvestment Act funding, Savannah River Site (SRS) continues to safely treat and dispose of radioactive waste created while producing

  11. RRC - Geothermal Production Test Completion or Recompletion Report...

    Open Energy Info (EERE)

    Geothermal Production Test Completion or Recompletion Report and Log Form GT-1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RRC - Geothermal Production...

  12. Westinghouse Completes its AP1000® Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes its AP1000® Test Stand Last June, CASL launched its first Virtual Environment for Reactor Applications (VERA) Test Stand on the Westinghouse engineering computer cluster. Westinghouse selected the AP1000® pressurized water reactor (PWR) first core for the Test Stand simulation because its advanced design and operational features, and imminent deployment in units under construction, make it a particularly relevant and engaging application of CASL technology. The Westinghouse Test

  13. NNSA, Air Force Complete Successful B61-12 Life Extension Program

    National Nuclear Security Administration (NNSA)

    Development Flight Test at Tonopah Test Range | National Nuclear Security Administration | (NNSA) Development Flight Test at Tonopah Test Range July 08, 2015 WASHINGTON, D.C. - The United States Air Force (USAF) and National Nuclear Security Administration (NNSA) completed the first development flight test of a non-nuclear B61-12 gravity bomb at Tonopah Test Range in Nevada on July 1, 2015. "This test marks a major milestone for the B61-12 Life Extension Program, demonstrating

  14. Reduce completion fluid costs with on-site brine tests

    SciTech Connect (OSTI)

    Thomas, D.C.; Darlington, R.K.; Kinney, W.R.; Lowell, J.L.

    1982-09-01

    A newly developed field kit makes on-site brine completion fluid testing practical. Simple titration procedures are used to analyze brine for calcium, zinc, chloride and bromide with an accuracy and repeatability that compares favorably with expensive laboratory techniques. This article describes the field testing theory and details analytical procedures used.

  15.  Westinghouse Completes its AP1000 Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

     Westinghouse Completes its AP1000 Test Stand  VERA-CS Coupled Multi-physics Capability demonstrated in a Full-core Simulation  TVA provides Watts Bar Operating Data to Support Validation of CASL Tools  University of Michigan adds Depletion Capability to MPACT for VERA-CS  VERA Data Transfer Processes Provided by DTK  Alternate Coupling Algorithm Investigations Completed  Role of HPC in the Nuclear Power Industry  TVA Test Stand Launched November 2013 Volume 1, Issue 4

  16. NNSA Conducts Successful W78 JTA Flight Test | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Test July 08, 2011 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA), working with the U.S. Air Force, recently conducted a successful W78 Joint Test ...

  17. Solar Test Facility Upgrades Complete, Leading to Better Sandia

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capabilities to Support Power Industry Test Facility Upgrades Complete, Leading to Better Sandia Capabilities to Support Power Industry - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power

  18. W88 warhead program performs successful tests | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) W88 warhead program performs successful tests Tuesday, October 28, 2014 - 1:21pm The first flight and drop tests for the latest variant of the W88 nuclear warhead are providing data for Sandia National Laboratories to validate designs, improve computer modeling and update component specifications. The two successful tests, which were conducted this summer, provide data for the program, the W88 ALT 370 (alteration), to move forward, The Critical Radar Arming and Fuzing

  19. PPPL successfully tests system for mitigating instabilities called

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "ELMs" | Princeton Plasma Physics Lab PPPL successfully tests system for mitigating instabilities called "ELMs" By John Greenwald September 29, 2014 Tweet Widget Google Plus One Share on Facebook Close-up view of the high-speed propellor inside the injector. (Photo by Elle Starkman/Princeton Office of Communications ) Close-up view of the high-speed propellor inside the injector. PPPL has successfully tested a Laboratory-designed device to be used to diminish the size of

  20. PPPL successfully tests system for mitigating instabilities called

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "ELMs" | Princeton Plasma Physics Lab PPPL successfully tests system for mitigating instabilities called "ELMs" By John Greenwald September 29, 2014 Tweet Widget Google Plus One Share on Facebook Close-up view of the high-speed propellor inside the injector. (Photo by Elle Starkman/Princeton Office of Communications ) Close-up view of the high-speed propellor inside the injector. PPPL has successfully tested a Laboratory-designed device to be used to diminish the size of

  1. Successful testing of Sandia Labs' Wave Energy Converter (WEC) system

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Successful testing of Sandia Labs' Wave Energy Converter (WEC) system - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy

  2. Tahoe subsea completion -- A successful application of existing and new technologies

    SciTech Connect (OSTI)

    Clegg, W.K.; Orr, K.

    1995-12-31

    The Tahoe subsea satellite tieback (VK783) demonstrates how existing and new subsea technologies can be combined to achieve a cost effective yet technically significant subsea project. A used Green Canyon 29 subsea Xmas tree was refurbished and modified to implement more recent first-end layaway techniques for both the flowline and umbilical. The diverless completion was made in 1,500 ft. of water and tied back approximately 12 miles to a platform in 275 feet of water (Main Pass 252). The flowline system consisted of dual nominal 4-in. lines comprising both flexible and rigid pipes. The control system was multiplexed electrohydraulic with signal-on power umbilical transmission. Both downhole and Xmas tree temperature and pressure measurements were employed. The techniques used in the Tahoe subsea system can be applied to other projects to help improve cost, schedule, and reliability of subsea tiebacks.

  3. Godchaux Well No. 1, Vermilion Parish, Louisiana: completion and testing. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The Godchaux Well No. 1 was originally drilled too a total depth of 16,000 feet in January, 1981 by C and K Petroleum, Inc. and was temporarily abandoned. The well was re-entered by Eaton on 6 August 1981 in an effort to clean out the original open hole below the 7-5/8 inch liner and test a section of the Planulina sand at a depth ranging from 15,584 to 15,692 feet. The reservoir pressure was estimated to be 14,480 psi, and the temperature of the formation water was expected to be 298/sup 0/F. The water salinity was predicted to be 70,000 ppM. The well was expected to produce up to 20,000 BWPD, was a gas content of 44 SCF per barrel. An optional test of a zone from 14,905 to 15,006 feet was also proposed in the detailed completion prognosis, which preceded the attempted test. In the process of drilling the cement plug set by the original operators, the drill string became side-tracked from the original hole. While drilling at 14,510 feet a severe loss of circulation of drilling fluid occurred through a hole in the intermediate casing. The reduction in hydrostatic head resulting from lost circulation caused the open hole to close around and stick the drill string. Efforts to repair the intermediate casing and return to normal operations were estimated to be prohibitively expensive in view of the expected poor probability of success; accordingly, the decision to plug and abandon was carried out on September 12, 1981.

  4. PPPL successfully tests system for mitigating instabilities called...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PPPL used salt grain-sized plastic pellets as proxies for lithium granules in testing the system for DIII-D. The pellets fell through a pinhole-sized opening inside a dropper to a ...

  5. Complete braided adsorbent for marine testing to demonstrate 3g-U/kg-adsorbent

    SciTech Connect (OSTI)

    Janke, Chris; Yatsandra, Oyola; Mayes, Richard; none,; Gill, Gary; Li-Jung, Kuo; Wood, Jordana; Sadananda, Das

    2014-04-30

    ORNL has manufactured four braided adsorbents that successfully demonstrated uranium adsorption capacities ranging from 3.0-3.6 g-U/kg-adsorbent in marine testing at PNNL. Four new braided and leno woven fabric adsorbents have also been prepared by ORNL and are currently undergoing marine testing at PNNL.

  6. Idaho Cleanup Project completes work at Test Area North complex at DOE�s

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho site Idaho Cleanup Project completes work at Test Area North complex at DOE�s Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all the original contract work scope at the U.S. Department of Energy�s Idaho Site�s Test Area North (TAN) complex. The work involved close cooperation among the Department of Energy, the Environmental Protection Agency and the Idaho Department of Environmental Quality, with public input incorporated

  7. EERE Success Story-Milestone for Regional Test Center in Vermont...

    Office of Environmental Management (EM)

    for Regional Test Center in Vermont EERE Success Story-Milestone for Regional Test Center in Vermont October 28, 2014 - 11:57am Addthis Together with the National Renewable Energy ...

  8. EERE Success Story-SunShot-funded Advanced Inverter Testing Enables...

    Office of Environmental Management (EM)

    SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaii's Electric Grid EERE Success Story-SunShot-funded Advanced Inverter Testing Enables ...

  9. Milestone Report - Complete New Adsorbent Materials for Marine Testing to Demonstrate 4.5 g-U/kg Adsorbent

    SciTech Connect (OSTI)

    Janke, Christopher James; Das, Sadananda; Oyola, Yatsandra; Mayes, Richard T.; Saito, Tomonori; Brown, Suree; Gill, Gary; Kuo, Li-Jung; Wood, Jordana

    2014-08-01

    This report describes work on the successful completion of Milestone M2FT-14OR03100115 (8/20/2014) entitled, “Complete new adsorbent materials for marine testing to demonstrate 4.5 g-U/kg adsorbent”. This effort is part of the Seawater Uranium Recovery Program, sponsored by the U.S. Department of Energy, Office of Nuclear Energy, and involved the development of new adsorbent materials at the Oak Ridge National Laboratory (ORNL) and marine testing at the Pacific Northwest National Laboratory (PNNL). ORNL has recently developed two new families of fiber adsorbents that have demonstrated uranium adsorption capacities greater than 4.5 g-U/kg adsorbent after marine testing at PNNL. One adsorbent was synthesized by radiation-induced graft polymerization of itaconic acid and acrylonitrile onto high surface area polyethylene fibers followed by amidoximation and base conditioning. This fiber showed a capacity of 4.6 g-U/kg adsorbent in marine testing at PNNL. The second adsorbent was prepared by atom-transfer radical polymerization of t-butyl acrylate and acrylonitrile onto halide-functionalized round fibers followed by amidoximation and base hydrolysis. This fiber demonstrated uranium adsorption capacity of 5.4 g-U/kg adsorbent in marine testing at PNNL.

  10. Testing geopressured geothermal reservoirs in existing wells. Final report P. R. Girouard Well No. 1, Lafayette Parish, Louisiana. Volume I. Completion and testing

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The P.R. Girouard No. 1 Well, located approximately 10 miles southeast of Lafayette, Louisiana, was the fourth successful test of a geopressured-geothermal aquifer under the Wells of Opportunity program. The well was tested through 3-1/2 inch tubing set on a packer at 14,570 feet without major problems. The geological section tested was the Oligocene Marginulina Texana No. 1 sand of upper Frio age. The interval tested was from 14,744 to 14,819 feet. Produced water was piped down a disposal well perforated from 2870 to 3000 feet in a Miocene saltwater sand. Four flow tests were conducted for sustained production rates of approximately 4000 BWPD to approximately 15,000 BWPD. The highest achieved, during a fifth short test, was 18,460 BWPD. The test equipment was capable of handling higher rates. The gas-to-water ratio was relatively uniform at approximately 40 SCF/bbl. The heating value of the gas is 970 Btu/SCF. The reservoir tests show that is is doubtful that this well would sustain production rates over 10,000 BWPD for any lengthy period from the sand zone in which it was completed. This limited flow capacity is due to the well's poor location in the reservoir and is not a result of any production deficiencies of the Marginulina Texana sand.

  11. Fourth flight test for W88 Alt 370 successful | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Fourth flight test for W88 Alt 370 successful Wednesday, March 16, 2016 - 12:39pm An unarmed test weapon is launched from the Ohio-class ballistic missile submarine USS Kentucky during a test at the Pacific Test Range in Hawaii. A successful test conducted by the U.S. Navy, in coordination with NNSA, marked the fourth of its kind in support of NNSA's W88 alteration (Alt) 370 program. The unarmed W88 warhead was launched atop a Trident II missile from the USS Kentucky

  12. Milestone Report - M4FT-14OR0312022 - Co-absorption studies - Design system complete/test plan complete

    SciTech Connect (OSTI)

    Bruffey, Stephanie H.; Spencer, Barry B.; Jubin, Robert Thomas

    2013-12-01

    The objective of this test plan is to describe research that will determine the effectiveness of silver mordenite and molecular sieve beds to remove iodine and water (tritium) from off-gas streams arising from used nuclear fuel recycling processes, and to demonstrate that the iodine and water can be recovered separately from one another.

  13. Flight Test of Weapons System Body by Navy Successful | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Flight Test of Weapons System Body by Navy Successful April 02, 2015 Third Flight Demonstrated Dynamics and Functional Performance in Flight Environment WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) today announced the Follow-On Commander Evaluation Test-51 (FCET-51) flight body was successfully flown by the Navy recently. This test was one of several in a sequence of flight tests for the qualification efforts of the W88-0/Mk5 ALT 370

  14. EERE Success Story-Milestone for Regional Test Center in Vermont |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy for Regional Test Center in Vermont EERE Success Story-Milestone for Regional Test Center in Vermont October 28, 2014 - 11:57am Addthis Together with the National Renewable Energy Laboratory and Sandia National Laboratories, EERE helped establish five regional test centers across the United States. The regional test center in Williston, Vermont, recently achieved a major milestone with the installation of a 66-kW solar energy research system, which will focus on

  15. EERE Success Story-Putting Solar Panels to the Test | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Putting Solar Panels to the Test EERE Success Story-Putting Solar Panels to the Test October 29, 2015 - 3:46pm Addthis This solar photovoltaic (PV) array is being tested in hot, humid weather at the Cocoa, Florida Regional Test Center. This solar photovoltaic (PV) array is being tested in hot, humid weather at the Cocoa, Florida Regional Test Center. Mother Nature can be unpredictable. Sometimes she sends hail; other times, damaging winds; and if you live in a cold climate, she loves

  16. EERE Success Story-Open-Source Testing Reaches New Milestone for Wave

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy | Department of Energy Open-Source Testing Reaches New Milestone for Wave Energy EERE Success Story-Open-Source Testing Reaches New Milestone for Wave Energy April 8, 2016 - 1:45pm Addthis WEC-Sim Phase 1 testing at the Oregon State University Hinsdale Directional Wave Basin. WEC-Sim Phase 1 testing at the Oregon State University Hinsdale Directional Wave Basin. Ocean wave energy is a developing next-generation technology. Wave energy converters are important for renewable energy

  17. EERE Success Story-Establishing a Testing Center for Ocean Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies in the Pacific Northwest | Department of Energy Establishing a Testing Center for Ocean Energy Technologies in the Pacific Northwest EERE Success Story-Establishing a Testing Center for Ocean Energy Technologies in the Pacific Northwest April 9, 2013 - 12:00am Addthis The University of Washington (UW) and Oregon State University (OSU) have partnered with EERE to develop the Northwest National Marine Renewable Energy Center (NNMREC), as one of three National Marine Renewable

  18. EERE Success Story-Goodyear Testing Self-Inflating Tire Systems in U.S.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trucking Fleets | Department of Energy Goodyear Testing Self-Inflating Tire Systems in U.S. Trucking Fleets EERE Success Story-Goodyear Testing Self-Inflating Tire Systems in U.S. Trucking Fleets April 7, 2015 - 4:52pm Addthis This graphic shows how Goodyear's new Air Maintenance Technology -- also called the self-regulating tire -- works. | Graphic courtesy of Goodyear. This graphic shows how Goodyear's new Air Maintenance Technology -- also called the self-regulating tire -- works. |

  19. EERE Success Story-SunShot Funding Spurs Standardized Testing for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Smart" Solar Inverters | Department of Energy Funding Spurs Standardized Testing for "Smart" Solar Inverters EERE Success Story-SunShot Funding Spurs Standardized Testing for "Smart" Solar Inverters August 12, 2015 - 1:02pm Addthis Caption: Inverters allow for the electricity produced by solar panels to be converted into electricity. Licensed photo courtesy of Lauren Wellicome. Caption: Inverters allow for the electricity produced by solar panels to be

  20. Solid Oxide Fuel Cell Successfully Powers Truck Cab and Sleeper in DOE-Sponsored Test

    Broader source: Energy.gov [DOE]

    In a test sponsored by the U.S. Department of Energy, a Delphi auxiliary power unit employing a solid oxide fuel cell (SOFC) successfully operated the electrical system and air conditioning of a Peterbilt Model 386 truck under conditions simulating idling conditions for 10 hours.

  1. Complete Initial Scoping Tests on the Incorporation of Novel Loaded Iodine Getters into GCM.

    SciTech Connect (OSTI)

    Nenoff, Tina M.; Garino, Terry J.; Croes, Kenneth James

    2015-08-18

    This study encompasses initial scoping tests on the incorporation of a novel iodine loaded getter material into the Sandia developed low temperature sintering glass ceramic material (GCM) waste form. In particular, we studied the PNNL Ag-I-Aerogel. Optical microscopy indicates inhomogenous samples based on particle sizes and variations in color (AgI vs Ag/AgO on silica). TGA/MS data when heated in air indicates loss of iodine and organics (CO2) between 250-450°C a total of ~15wt% loss, with additional / small iodine loss when during 550°C hold for 1 hr. TGA/MS data when heated in N2 indicates less organic and slightly less iodine loss below 550°C, with no loss of iodine in 550°C 1 hour hold. Furthermore, a substantial mass loss of sulfur containing compounds is observed (m/e of 34 and 36) between 150 – 550°C in both air and N2 sintering atmospheres. In an effort to capture iodine lost to volatilization during heating (at temps below glass sintering temperature of 550°C), we added 5 wt% Ag flake to the AgIaerogel. Resulting data indicates the iodine is retained with the addition of the Ag flake, resulting in only a small iodine loss (< 1wt%) at ~350°C. No method of curtailing loss of sulfur containing compounds due to heating was successful in this scoping study.

  2. Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada

    SciTech Connect (OSTI)

    2009-12-01

    The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).

  3. COMPLETION OF THE TRANSURANIC GREATER CONFINEMENT DISPOSAL BOREHOLE PERFORMANCE ASSESSMENT FOR THE NEVADA TEST SITE

    SciTech Connect (OSTI)

    Colarusso, Angela; Crowe, Bruce; Cochran, John R.

    2003-02-27

    Classified transuranic material that cannot be shipped to the Waste Isolation Pilot Plant in New Mexico is stored in Greater Confinement Disposal boreholes in the Area 5 Radioactive Waste Management Site on the Nevada Test Site. A performance assessment was completed for the transuranic inventory in the boreholes and submitted to the Transuranic Waste Disposal Federal Review Group. The performance assessment was prepared by Sandia National Laboratories on behalf of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office using an iterative methodology that assessed radiological releases from the intermediate depth disposal configuration against the regulatory requirements of the 1985 version of 40 CFR 191 of the U.S. Environmental Protection Agency. The transuranic materials are stored at 21 to 37 m depth (70 to 120 ft) in large diameter boreholes constructed in the unsaturated alluvial deposits of Frenchman Flat. Hydrologic processes that affect long- term isolation of the radionuclides are dominated by extremely slow upward rates of liquid/vapor advection and diffusion; there is no downward pathway under current climatic conditions and there is no recharge to groundwater under future ''glacial'' climatic conditions. A Federal Review Team appointed by the Transuranic Waste Disposal Federal Review Group reviewed the Greater Confinement Disposal performance assessment and found that the site met the majority of the regulatory criteria of the 1985 and portions of the 1993 versions of 40 CFR 191. A number of technical and procedural issues required development of supplemental information that was incorporated into a final revision of the performance assessment. These issues include inclusion of radiological releases into the complementary cumulative distribution function for the containment requirements associated with drill cuttings from inadvertent human intrusion, verification of mathematical models used in the performance

  4. EERE Success Story-SunShot-funded Advanced Inverter Testing Enables 2,500

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Energy Systems to Connect to Hawaii's Electric Grid | Department of Energy SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaii's Electric Grid EERE Success Story-SunShot-funded Advanced Inverter Testing Enables 2,500 Solar Energy Systems to Connect to Hawaii's Electric Grid January 22, 2015 - 3:45pm Addthis Thanks to a SunShot collaboration at the Energy Department's National Renewable Energy Laboratory (NREL) more than 2,500 Hawaiian

  5. Complete Bouguer gravity map of the Nevada Test Site and vicinity, Nevada

    SciTech Connect (OSTI)

    Healey, D.L.; Harris, R.N.; Ponce, D.A.; Oliver, H.W.

    1987-12-31

    About 15,000 gravity stations were used to create the gravity map. Gravity studies at the Nevada Test Site were undertaken to help locate geologically favorable areas for underground nuclear tests and to help characterize potential high-level nuclear waste storage sites. 48 refs. (TEM)

  6. 16th intersociety energy conversion engineering conference. CDIF - activation completion and initial MHD test results

    SciTech Connect (OSTI)

    Staats, G.E.; DeJong, V.J.; Karvinen, R.J.; Carrington, R.A.; Bauman, L.E.

    1981-01-01

    The Component Development and Integration Facility (CDIF) is one of the Department of Energy's (DOE) Magnetohydrodynamics (MHD) experimental test facilities. The scope of this paper is limited to a brief description of the facility activation and results from the initial MHD testing using an oil fired ash injected combustor (AIC) and a supersonic channel. 1 ref.

  7. Construction of MV-6 Well Pad at the Central Nevada Test Area Completed

    Office of Energy Efficiency and Renewable Energy (EERE)

    A new groundwater monitoring/validation (MV) well was installed at the Central Nevada Test Area (CNTA) in September 2013. LM proposed this well to the Nevada Division of Environmental Protection ...

  8. Prairie Canal Well No. 1, Calcasieu Parish, Louisiana. Volume 1. Completion and testing. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The Prairie Canal Company, Inc. Well No. 1, approximately 8 miles south of the city of Lake Charles, Louisiana, was tested through the annulus between 5-1/2 inch casing and 2-3/8 inch tubing. The interval tested was from 14,782 to 14,820 feet. The geological section was the Hackberry Sand, a member of the Oligocene Frio formation. Produced water was injected into a disposal well which was perforated in several Miocene Sands from 3070 to 4600 feet. Original plans were to test a section of the Hackberry sand from 14,976 to 15,024 feet. This primary zone, however, produced a large amount of sand, shale, gravel, and rocks during early flow periods and was abandoned in favor of the secondary zone. Four pressure drawdown flow tests and three pressure buildup tests were conducted during a 12-day period. A total of 36,505 barrels of water was produced. The highest sustained flow rate was approximately 7100 BWPD. The gas-to-water ratio, measured during testing, ranged from 41 to 50 SCF/BBL. There is disagreement as to the saturation value of the reservoir brine, which may be between 43.3 and 49.7 SCF/BBL. The methane content of the flare line gas averaged 88.4 mole percent. The CO/sub 2/ content averaged 8.4 mole percent. Measured values of H/sub 2/S in the gas were between 12 and 24 ppM.

  9. Testing geopressured geothermal reservoirs in existing wells: Detailed completion prognosis for geopressured-geothermal well of opportunity, prospect #2

    SciTech Connect (OSTI)

    1981-03-01

    A geopressured-geothermal test of Martin Exploration Company's Crown Zellerbach Well No. 2 will be conducted in the Tuscaloosa Trend. The Crown Zellerbach Well No. 1 will be converted to a saltwater disposal well for disposal of produced brine. The well is located in the Satsuma Area, Livingston parish, Louisiana. Eaton proposes to test the Tuscaloosa by perforating the 7 inch casing from 16,718 feet to 16,754 feet. The reservoir pressure at an intermediate formation depth of 16,736 feet is anticipated to be 12,010 psi and the temperature is anticipated to be 297 F. Calculated water salinity is 16,000 ppm. The well is expected to produce a maximum of 16,000 barrels of water a day with a gas content of 51 SCF/bbl. Eaton will re-enter the test well, clean out to 17,000 feet, run production casing and complete the well. The disposal well will be re-entered and completed in the 9-5/8 inch casing for disposal of produced brine. Testing will be conducted similar to previous Eaton annular flow WOO tests. An optional test from 16,462 feet to 16,490 feet may be performed after the original test and will require a workover with a rig on location to perform the plugback. The surface production equipment utilized on previous tests will be utilized on this test. The equipment has worked satisfactorily and all parties involved in the testing are familiar with its operation. Weatherly Engineering will operate the test equipment. The Institute of Gas Technology (IGT) and Mr. Don Clark will handle sampling, testing and reservoir engineering evaluation, respectively. wireline work required will be awarded on basis of bid evaluation. At the conclusion of the test period, the D.O.E. owned test equipment will be removed from the test site, the test and disposal wells plugged and abandoned and the sites restored to the satisfaction of all parties.

  10. COMPENDIUM OF COMPLETED TESTING IN SUPPORT OF ROTARY MICROFILTRATION AT SAVANNAH RIVER SITE AND HANFORD

    SciTech Connect (OSTI)

    HUBER HJ

    2011-05-24

    This report presents a chronological summary of previous technology development efforts concerning the rotary microfiltration (RMF) unit from SpinTek{trademark}. Rotary microfiltration has been developed for high radiation application over the last decades as one of the optional filtration techniques for supplemental treatment. Supplemental treatment includes a near- or in-tank solids separation and subsequent cesium removal unit, followed by an immobilization technique; this includes options such as steam reforming, bulk vitrification or cast stone (grout). The main difference between RMF and standard cross flow filtration (CFF) is the disconnection of filtrate flux from feed velocity; i.e., filtrate flux is only dependent on transmembrane pressure, filter fouling and temperature. These efforts have been supported by the U.S. Department of Energy (DOE), Office of Cleanup Technologies since the 1990s by their Environmental Management Program (currently EM-31). In order to appropriately address future testing needs, a compilation of the relevant previous testing reports was essential. This compendium does not intend to cover all of the presentations/reports that were produced over the last decades but focuses on those of relevance for developing an RMF unit fit for deployment at the Hanford site. The report is split into three parts: (1) an introductory overview, (2) Figure 1 graphically covering the main development steps and its key players and (3) a more detailed table of the citations and brief descriptions of results and recommendations.

  11. Advanced Photovoltaic Inverter Functionality using 500 kW Power Hardware-in-Loop Complete System Laboratory Testing: Preprint

    SciTech Connect (OSTI)

    Mather, B. A.; Kromer, M. A.; Casey, L.

    2013-01-01

    With the increasing penetration of distribution connected photovoltaic (PV) systems, more and more PV developers and utilities are interested in easing future PV interconnection concerns by mitigating some of the impacts of PV integration using advanced PV inverter controls and functions. This paper describes the testing of a 500 kW PV inverter using Power Hardware-in-Loop (PHIL) testing techniques. The test setup is described and the results from testing the inverter in advanced functionality modes, not commonly used in currently interconnected PV systems, are presented. PV inverter operation under PHIL evaluation that emulated both the DC PV array connection and the AC distribution level grid connection are shown for constant power factor (PF) and constant reactive power (VAr) control modes. The evaluation of these modes was completed under varying degrees of modeled PV variability.

  12. Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin, Rev. No.: 1

    SciTech Connect (OSTI)

    Echelard, Tim

    2006-09-01

    Three underground nuclear tests were conducted on Amchitka Island, Alaska, in 1965, 1969, and 1971. The effects of the Long Shot, Milrow, and Cannikin tests on the environment were extensively investigated during and following the detonations, and the area continues to be monitored today. This report is intended to document the basis for the Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin (hereafter referred to as ''Amchitka Site'') subsurface completion recommendation of No Further Remedial Action Planned with Long-Term Surveillance and Maintenance, and define the long-term surveillance and maintenance strategy for the subsurface. A number of factors were considered in evaluating and selecting this recommendation for the Amchitka Site. Historical studies and monitoring data, ongoing monitoring data, the results of groundwater modeling, and the results of an independent stakeholder-guided scientific investigation were also considered in deciding the completion action. Water sampling during and following the testing showed no indication that radionuclides were released to the near surface, or marine environment with the exception of tritium, krypton-85, and iodine-131 found in the immediate vicinity of Long Shot surface ground zero. One year after Long Shot, only tritium was detectable (Merritt and Fuller, 1977). These tritium levels, which were routinely monitored and have continued to decline since the test, are above background levels but well below the current safe drinking water standard. There are currently no feasible means to contain or remove radionuclides in or around the test cavities beneath the sites. Surface remediation was conducted in 2001. Eleven drilling mud pits associated with the Long Shot, Milrow and Cannikin sites were remediated. Ten pits were remediated by stabilizing the contaminants and constructing an impermeable cap over each pit. One pit was remediated by removing all of the contaminated mud for consolidation in

  13. EERE Success Story-New Wind Test Facilities Open in Colorado...

    Broader source: Energy.gov (indexed) [DOE]

    Two of the world's largest state-of-the-art drivetrain test facilities are now open for ... DOE's new test facility at the NWTC offers industry the capability to perform accelerated ...

  14. EERE Success Story—New Wind Test Facilities Open in Colorado and South Carolina

    Broader source: Energy.gov [DOE]

    Two state-of-the-art wind testing facilities will accelerate development and deployment of wind energy technologies.

  15. EERE Success Story-SunShot-funded Advanced Inverter Testing Enables...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... National Renewable Energy Laboratory engineer Greg Martin (from left) works with Solectria engineers Jonathon Smith and Jihua Ma testing Solectria's smart inverter at the Energy ...

  16. Successful Completion of the Largest Shipment of Russian Research Reactor High-Enriched Uranium Spent Nuclear Fuel from Czech Republic to Russian Federation

    SciTech Connect (OSTI)

    Michael Tyacke; Dr. Igor Bolshinsky; Jeff Chamberlin

    2008-07-01

    On December 8, 2007, the largest shipment of high-enriched uranium spent nuclear fuel was successfully made from a Russian-designed nuclear research reactor in the Czech Republic to the Russian Federation. This accomplishment is the culmination of years of planning, negotiations, and hard work. The United States, Russian Federation, and the International Atomic Energy Agency have been working together on the Russian Research Reactor Fuel Return (RRRFR) Program in support of the Global Threat Reduction Initiative. In February 2003, RRRFR Program representatives met with the Nuclear Research Institute in Rež, Czech Republic, and discussed the return of their high-enriched uranium spent nuclear fuel to the Russian Federation for reprocessing. Nearly 5 years later, the shipment was made. This paper discusses the planning, preparations, coordination, and cooperation required to make this important international shipment.

  17. Testing geopressured geothermal reservoirs in existing wells: Detailed completions prognosis for geopressured-geothermal well of opportunity, prospect #1

    SciTech Connect (OSTI)

    Kennedy, Clovis A.

    1980-04-03

    This prospective well of opportunity was originally drilled and completed as a gas producer by Wrightsman Investment Company in early 1973. The original and present producing interval was from 15,216 to 15,238 feet. IMC Exploration Company, Inc. acquired the property from Wrightsman and is the present owner operator. The well is presently shut in s a non-economic producer and IMC proposed to perform plug and abandonment operations in April, 1980. This well has a good geopressured-geothermal water sand behind the 5-1/2 inch casing that has 94 feet of net sand thickness. Pursuant to DOE/NVO authorization of March 11,1980, Eaton negotiated an option agreement with IMC whereby IMC would delay their abandonment operations for a period of 90 days to permit DOE to evaluate the well for geopressure-geothermal testing. The IMC-Eaton option agreements provide that IMG will delay plugging the well until June 15, 1980. If Eaton exercises its option to acquire the well, IMC will sell the well bore, and an adjacent salt water disposal well, to Eaton for the sole consideration of Eaton assuming the obligation to plug and abandon the wells in accordance with lease and regulatory requirements. If Eaton does not exercise its option, then Eaton will pay IMC $95,000 cash and IMC will proceed with plugging and abandonment at the termination of the option period.

  18. Complete Phase I Tests As Described in the Multi-lab Test Plan for the Evaluation of CH3I Adsorption on AgZ

    SciTech Connect (OSTI)

    Bruffey, S. H.; Jubin, R. T.

    2014-09-30

    Silver-exchanged mordenite (AgZ) has been identified as a potential sorbent for iodine present in the off-gas streams of a used nuclear fuel reprocessing facility. In such a facility, both elemental and organic forms of iodine are released from the dissolver in gaseous form. These species of iodine must be captured with high efficiency for a facility to avoid radioactive iodine release above regulatory limits in the gaseous effluent of the plant. Studies completed at Idaho National Laboratory (INL) examined the adsorption of organic iodine in the form of CH3I by AgZ. Upon breakthrough of the feed gas through the sorbent bed, elemental iodine was observed in the effluent stream, despite the fact that the only source of iodine in the system was the CH3I in the feed gas.1 This behavior does not appear to have been reported previously nor has it been independently confirmed. Thus, as a result of these prior studies, multiple knowledge gaps relating to the adsorption of CH3I by AgZ were identified, and a multi-lab test plan, including Oak Ridge National Laboratory (ORNL), INL, Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories, was formulated to address each in a systematic way.2 For this report, the scope of work for ORNL was further narrowed to three thin-bed experiments that would characterize CH3I adsorption onto AgZ in the presence of water, NO, and NO2. Completion of these three-thin bed experiments demonstrated that organic iodine in the form of CH3I was adsorbed by reduced silver mordenite (Ag0Z) to a 50% higher loading than that of I2 when adsorbed from a dry air stream. Adsorption curves suggest different adsorption mechanisms for I2 and CH3I. In the presence of NO and NO2 gas, the loading of CH3I onto Ag0Z is suppressed and may be reversible. Further, the presence of NO and NO2 gas appears to oxidize CH3I to I2; this is indicated by an adsorption curve similar to that of I2 on Ag0Z. Finally, the loss of organic iodine loading

  19. WIPP Successfully Completes ISO 14001 Certification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and services, pollution prevention (P2) (cost-effective waste prevention, recycling, diversion of solid wastes), sustainable designhigh performance buildings, reduction in...

  20. NNSA Completes Successful Facilities and Infrastructure Recapitalizati...

    National Nuclear Security Administration (NNSA)

    ... at the Pantex Plant, compressed air and potable water system upgrades and a steam plant life extension at Y-12 and 31 miles of highway repairs at Nevada National Security Site. ...

  1. Drilling, completion, stimulation, and testing of BDM/CNGD Well 3997, Lee District, Calhoun County, West Virginia

    SciTech Connect (OSTI)

    Overbey, W.K. Jr.; Carden, R.S.; Salamy, S.P.; Locke, C.D.; Johnson, H.R.

    1992-03-01

    This report discusses the detailed field operations in drilling, casing, completing, and stimulating the Hunter Bennett No. 3997 well located in Lee District, Calhoun County West Virginia. The project was designed and managed by BDM in cooperation with CNG Development Company. The well was spudded on November 9, 1990, and drilling was completed on December 14, 1990. The well was drilled on an average asmuth of 312 degrees with a total horizontal displacement of 2459 feet. The well was turned to a 90 degree inclination from the vertical over a measured course length of 1216 feet. Approximately 1381 feet of the well had an inclination higher than 86 degrees, while 2179 feet had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Each zone is a little more than 300 feet long. The well was stimulated with nitrogen gas in zones one and two. Early production results are encouraging. The BDM/CNGD horizontal well averaged 147 mcfd of gas over the first week of production and, in week five, began to produce oil at a rate of about 2 bbl/day.

  2. Drilling, completion, stimulation, and testing of BDM/CNGD Well 3997, Lee District, Calhoun County, West Virginia. Final report

    SciTech Connect (OSTI)

    Overbey, W.K. Jr.; Carden, R.S.; Salamy, S.P.; Locke, C.D.; Johnson, H.R.

    1992-03-01

    This report discusses the detailed field operations in drilling, casing, completing, and stimulating the Hunter Bennett No. 3997 well located in Lee District, Calhoun County West Virginia. The project was designed and managed by BDM in cooperation with CNG Development Company. The well was spudded on November 9, 1990, and drilling was completed on December 14, 1990. The well was drilled on an average asmuth of 312 degrees with a total horizontal displacement of 2459 feet. The well was turned to a 90 degree inclination from the vertical over a measured course length of 1216 feet. Approximately 1381 feet of the well had an inclination higher than 86 degrees, while 2179 feet had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Each zone is a little more than 300 feet long. The well was stimulated with nitrogen gas in zones one and two. Early production results are encouraging. The BDM/CNGD horizontal well averaged 147 mcfd of gas over the first week of production and, in week five, began to produce oil at a rate of about 2 bbl/day.

  3. AZ-101 Gamma Cart Operational Test Report

    SciTech Connect (OSTI)

    MENDOZA, R.E.

    2000-03-30

    Test Report documenting the successful completion of the Operational Test Procedure for the AZ-101 Gamma Carts. Gamma carts are in support of the AZ-101 Mixer Pump Test.

  4. Completed EISs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed EISs Number of EISs in report: 294 Number Title Prog Office Ops Office Federal Register Notices Notice Date Citation Agency Areva Eagle Rock Enrichment Facility, Bonneville County, Idaho (Adopted) LP DOE/EIS-0471 5/20/2011 EPA 76 FR 29240 Adopted American Centrifuge Plant in Piketon, Pike County, Ohio (Adopted) LP DOE/EIS-0468 5/20/2011 EPA 76 FR 29240 Adopted Cushman Hydroelectric Project, Mason County, Washington (Adopted) EE DOE/EIS-0456 10/8/2010 EPA 75 FR 62386 NOA FEIS 11/29/2010

  5. test.eps

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    test and evaluation NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range WASHINGTON - The National Nuclear Security Administration (NNSA) and United States Air Force completed the third development flight test of a non-nuclear B61-12 nuclear gravity bomb at Tonopah Test Range in Nevada on October 20, 2015. "This demonstration of effective end-to-end system... Flight Test of Weapons System Body by Navy Successful Third Flight

  6. Completion practices in deep sour Tuscaloosa wells

    SciTech Connect (OSTI)

    Huntoon, G.G.

    1984-01-01

    Successful development of the Tuscaloosa trend in Louisiana has required unique completion practices to produce the trend's deep sour formations. Amoco's operations in the Tuscaloosa formation are between 16,000 and 21,000 ft (4877 and 6400 m), and a range of pressure environments, high temperatures, and corrosive elements is encountered. Application of proved completion practices and equipment has resulted in several techniques that enhance the safety, longevity, and production capacity of these wells. The design of deep Tuscaloosa completions is assisted by a series of correlations developed to project bottomhole and surface shut-in tubing pressures, temperature gradients, and flow capacities for deep sour wells. This paper discusses material selection, completion practices, completion fluids, wellhead equipment, packer designs, corrosion-inhibition systems, and safety and monitoring equipment used in the Tuscaloosa trend. The design of a wellhead surface installation used to detect equipment failure, to pump kill fluids, and to circulate corrosion inhibitors is reviewed. A case study illustrates the methods used in completing a Tuscaloosa well with surface pressures exceeding 16,000 psi (110.3 MPa). Deep high-pressure sour-gas wells can be completed safely if all the elements of the environment that will affect the mechanical integrity of the wellbore are considered in the completion designs. The development of higher-strength material capable of withstanding SSC is needed if wells are completed in formations deeper than 22,000 ft (6700 m). Further research is necessary on the use of alloy steels and nonferrous metals for sour service. Effective high-temperature corrosion inhibitors for heavy zinc bromide completion fluids must be developed before these brines can be used in the Tuscaloosa. The testing of new inhibitors for use in highpressure sour-gas completions should be continued.

  7. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect (OSTI)

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  8. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  9. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  10. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  11. Secretarial Succession

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-12-10

    To establish the Secretarial line of succession in the Department of Energy pursuant to section 202(a) of the Department of Energy Organization Act, 42 U.S.C. 7132(a). Canceled by DOE O 100.1A. Does not cancel any directives.

  12. Secretarial Succession

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-02-14

    To establish the Secretarial line of succession in the Department of Energy pursuant to section 202(a) of the Department of Energy Organization Act, 42 U.S.C. 7132(a). Cancels DOE O 100.1. Canceled by DOE O 100.1B.

  13. Secretarial Succession

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-12-07

    This Order establishes the Secretarial Order of Succession in the Department of Energy pursuant to section 202(a) of the Department of Energy Organization Act, 42 U.S.C. 7132(a). Cancels DOE O 100.1B. Canceled by DOE O 100.1D.

  14. Secretarial Succession

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-08-16

    To establish the Secretarial line of succession in the Department of Energy pursuant to section 202(a) of the Department of Energy Organization Act, 42 U.S.C. 7132( a). Cancels DOE O 100.1A. Canceled by DOE O 100.1C.

  15. "TRU" Success: SRS Recovery Act Prepares to Complete Shipment...

    Broader source: Energy.gov (indexed) [DOE]

    Act funding, Savannah River Site (SRS) continues to safely treat and dispose of radioactive waste created while producing materials for nuclear weapons throughout the Cold War. ...

  16. Successful River Corridor Contractor Completes Extra Work Scope...

    Broader source: Energy.gov (indexed) [DOE]

    A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different ...

  17. AMO Announces Successful Completion of Industrial-Scale Combined...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 20, 2015 - 9:00am Addthis Photo Courtesy of FuelCell Energy, Danbury, CT Photo Courtesy of FuelCell Energy, Danbury, CT AMO recently joined with FuelCell Energy of Danbury, CT ...

  18. EM Celebrates Successful Completion of Recovery Act Program

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – DOE officials today marked a historic landmark in EM’s mission as they celebrated the close of the Cold War cleanup program’s $6 billion American Recovery and Reinvestment Act Program.

  19. DOE Regional Partnership Successfully Demonstrates Terrestrial CO2 Storage Practices in Great Plains Region of U.S. and Canada

    Broader source: Energy.gov [DOE]

    A field test demonstrating the best approaches for terrestrial carbon dioxide storage in the heartland of North America has been successfully completed by one of the U.S. Department of Energy's seven Regional Carbon Sequestration Partnerships.

  20. test and evaluation | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    test and evaluation NNSA, Air Force Complete Successful B61-12 Life Extension Program Development Flight Test at Tonopah Test Range WASHINGTON - The National Nuclear Security Administration (NNSA) and United States Air Force completed the third development flight test of a non-nuclear B61-12 nuclear gravity bomb at Tonopah Test Range in Nevada on October 20, 2015. "This demonstration of effective end-to-end system... Flight Test of Weapons System Body by Navy Successful Third Flight

  1. Declaration of Construction Completion and Verification of Readiness...

    Energy Savers [EERE]

    Declaration of Construction Completion and Verification of Readiness to Test Declaration of Construction Completion and Verification of Readiness to Test Salt Waste Processing ...

  2. Completed Sites Listing

    Broader source: Energy.gov [DOE]

    As of fiscal year 2012, EM (and its predecessor organization UMTRA) completed cleanup and closed 91 sites in 24 states.

  3. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  4. Deactivation Completion and Turnover

    Broader source: Energy.gov [DOE]

    Achieving consensus that deactivation is complete can involve several parties including the deactivation contractor, the Field Office, DOE Headquarters, the post-deactivation contractor, regulators...

  5. Completed NSTX-U. After

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    panel (15 tons) being inserted into the new neutral beam box. New neutral beam box (40 tons) being moved into the NSTX-U test cell. Center stack encased within the vacuum boundary and lowered into the NSTX-U. Completed center stack installed in the NSTX-U. Completed NSTX-U. After Original NSTX prior to the upgrade. Before Building the first quadrant of the center stack magnet. Winding the ohmic heating coil around the center stack. National Spherical Torus Experiment - Upgrade NSTX was a

  6. flight test | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    flight test Fourth flight test for W88 Alt 370 successful A successful test conducted by the U.S. Navy, in coordination with NNSA, marked the fourth of its kind in support of NNSA's W88 alteration (Alt) 370 program. The unarmed W88 warhead was launched atop a Trident II missile from the USS Kentucky at the Pacific Missile Range Facility in Hawaii as part... NNSA, Air Force Complete Successful B61-12 Life Extension Program Instrumented Flight Tests WASHINGTON, D.C. - The National Nuclear Security

  7. NNSA celebrates completion of UPF project on time, under budget...

    National Nuclear Security Administration (NNSA)

    NNSA recently celebrated the successful completion of the Uranium Processing Facility site ... UPF will replace the hub of the nation's uranium processing operations. Read more. NNSA ...

  8. Edison's move has completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    completed January 8, 2016 by Richard Gerber We're pleased to announce that Edison is once again available to all NERSC users. The move from the NERSC Oakland Scientific Facility...

  9. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  10. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  11. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  12. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  13. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  14. OUT Success Stories: Twenty Years of Success

    DOE R&D Accomplishments [OSTI]

    2000-08-01

    DOE's Office of Utility Technologies celebrates 20 years of success in renewable energy research, development, and deployment.

  15. Franklin Completed Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completed Jobs Franklin Completed Jobs Select a time period Show jobs that completed after Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 @ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 : 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

  16. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  17. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  18. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  19. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  20. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complaint Form Complaint Form The Office of Inspector General (OIG) maintains a Hotline to facilitate the reporting of allegations of fraud, waste, abuse, or mismanagement in U.S. Department of Energy (DOE) programs or operations. To submit an allegation to the OIG, complete the form below. Acknowledgement * I acknowledge that I have read the Office of Inspector General Hotline section of the OIG website regarding issues which should be reported to the OIG, complaint processing, anonymity and

  1. Brookhaven Lab Completes Decommissioning of Graphite Research Reactor:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reactor core and associated structures successfully removed; waste shipped offsite for disposal | Department of Energy Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal September 1, 2012 - 12:00pm Addthis The

  2. Pendulum detector testing device

    DOE Patents [OSTI]

    Gonsalves, John M.

    1997-01-01

    A detector testing device which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: 1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, 2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and 3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements.

  3. Pendulum detector testing device

    DOE Patents [OSTI]

    Gonsalves, J.M.

    1997-09-30

    A detector testing device is described which provides consistent, cost-effective, repeatable results. The testing device is primarily constructed of PVC plastic and other non-metallic materials. Sensitivity of a walk-through detector system can be checked by: (1) providing a standard test object simulating the mass, size and material content of a weapon or other contraband, (2) suspending the test object in successive positions, such as head, waist and ankle levels, simulating where the contraband might be concealed on a person walking through the detector system; and (3) swinging the suspended object through each of the positions, while operating the detector system and observing its response. The test object is retained in a holder in which the orientation of the test device or target can be readily changed, to properly complete the testing requirements. 5 figs.

  4. After More Than 20 Years Operating, Hanford’s Soil Vapor Extraction Project Nears Completion

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Hanford workers are fast approaching the successful completion of a long-term cleanup project.

  5. Active DOE Completed Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Review Date P1137-2007REV Fire ProtecƟon Engineering FAQS DOE-STD-1137-2014 Karen Boardman (NNSA) P1181-2004REV Facility Maintenance Management DOE-STD-1181-2014 Karen Boardman FuncƟon Area QualiĮcaƟon Standard (HS-70) P1182-2004REV Civil Structural Engineering, FuncƟonal DOE-STD-1182-2014 Karen Boardman Area QualiĮcaƟon Standard (AU-70) P2013-03 ProtecƟve Force ConƟngency Planning DOE-HDBK-1213-2014

  6. Completion and workover fluid

    SciTech Connect (OSTI)

    Block, J.

    1985-09-17

    An aqueous completion or workover fluid for oil or gas wells having at least two solid components. One component is a hydroxy containing aluminum compound represented by the formula AlO(OH).xH/sub 2/O. The second component is a fluid loss control agent which can be either a cross-linked polyvinyl alcohol or a cross-linked hydroxyalkyl cellulose reaction product. An acid soluble weighting agent can be added for wells having higher down hole pressures. Examples of the weighting agents include iron carbonates, iron oxides, calcium carbonates, dolomite, sodium or calcium chloride, zinc bromide and calcium bromide. After use, the fluid can be displaced from the well with acid, e.g. 15% HCl, and the cake previously deposited on the bore-hole wall is dissolved by the acid so that no damaging residue remains.

  7. Method of well completion

    SciTech Connect (OSTI)

    Brieger, E. F.; Colle Jr., E. A.; George, F. R.

    1985-02-12

    A perforating gun is suspended downhole in a cased borehole, in underlying relationship relative to a packer device, and adjacent to a hydrocarbon-bearing formation to be completed. A connecting tubing interconnects the gun with the packer device, and includes a rupture barrier therebetween which prevents debris from accumulating within a gun firing head. An upper tubing string is removably connected to the packer device and forms a passageway which extends from the surface of the earth, down through the packer, and to the gun firing head. The upper tubing string includes a seal means and an extension tube which sealingly engages the packer device and penetrates the rupture barrier to provide a passageway through which the gun can be fired from the surface of the earth. This combination of elements prevents malfunction of the gun when the tool is left downhole for an appreciable length of time.

  8. Celebrating NFRR success | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Celebrating NFRR success Celebrating NFRR success Posted: March 20, 2015 - 12:36pm DOE Undersecretary for Nuclear Security and NNSA Administrator Frank Klotz congratulates Anna Beard, title, for successful completion of the Nuclear Facilities Risk Reduction project. DOE Undersecretary for Nuclear Security and NNSA Administrator Frank Klotz visited the Y-12 National Security Complex to celebrate the successful completion of the Nuclear Facilities Risk Reduction project. The Nuclear Facilities

  9. Deepwater completion and tieback -- A case study

    SciTech Connect (OSTI)

    Ghiselin, D.

    1996-10-01

    Major operators are engaged in large-scale integrated projects around the world. Does integration favor the big boys, or can a small independent operator benefit from this approach? Independent partners Hardy Oil and Gas USA and Samedan Oil Corp. looked into integrated project management to successfully design and install subsea completions, subsea pipelines, and platform tiebacks and interfaces to two platforms operated by Texaco and Chevron, respectively. The paper describes the project management approach taken and results of the project.

  10. Hydrocarbonization research: completion report

    SciTech Connect (OSTI)

    Youngblood, E.L.; Cochran, H.D. Jr.; Westmoreland, P.R.; Brown, C.H. Jr.; Oswald, G.E.; Barker, R.E.

    1981-01-01

    Hydrocarbonization is a relatively simple process used for producing oil, substitute natural gas, and char by heating coal under a hydrogen-rich atmosphere. This report describes studies that were performed in a bench-scale hydrocarbonization system at Oak Ridge National Laboratory (ORNL) during the period 1975 to 1978. The results of mock-up studies, coal metering valve and flowmeter development, and supporting work in an atmospheric hydrocarbonization system are also described. Oil, gas, and char yields were determined by hydrocarbonization of coal in a 0.1-m-diam fluidized-bed reactor operated at a pressure of 2170 kPa and at temperatures ranging from 694 to 854 K. The nominal coal feed rate was 4.5 kg/h. Wyodak subbituminous coal was used for most of the experiments. A maximum oil yield of approx. 21% based on moisture- and ash-free (maf) coal was achieved in the temperature range of 810 to 840 K. Recirculating fluidized-bed, uniformly fluidized-bed, and rapid hydropyrolysis reactors were used. A series of operability tests was made with Illinois No. 6 coal to determine whether caking coal could be processed in the recirculating fluidized-bed reactor. These tests were generally unsuccessful because of agglomeration and caking problems; however, these problems were eliminated by the use of chemically pretreated coal. Hydrocarbonization experiments were carried out with Illinois No. 6 coal that had been pretreated with CaO-NaOH, Na/sub 2/CO/sub 3/, and CaO-Na/sub 2/CO/sub 3/. Oil yields of 14, 24, and 21%, respectively, were obtained from the runs with treated coal. Gas and char yield data and the composition of the oil, gas, and char products are presented.

  11. LM Completes X-Ray Film Digitization Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has successfully completed a project to digitize nearly 400,000 medical x‑rays of former DOE contractor employees.

  12. Chris Bergren Director, Environment Compliance & Area Completion Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Deactivation & Decommissioning at SRS Chris Bergren Director, Environment Compliance & Area Completion Projects DOE Office of Environmental Management Robotics Team Visit to SRS Tuesday, December 8, 2015 Tony Long Acting Manager, Area Completion Projects T Area Completion Area Completions Then Now M Area Completion Now Then Now 2 In Situ Decommissioning of the Heavy Water Components Test Reactor (HWCTR) Before Reactor Dome Removal Reactor Vessel Removal Demolition of Dome After 3 K-Area

  13. EERE Success Story-Instrumentation Database Provides a Shared...

    Office of Environmental Management (EM)

    ideal and high-quality measurements is critical to the success of any test being planned. ... meet their needs while leveraging others' experience to help their test be successful. ...

  14. Completed Projects Table.xlsx

    Office of Environmental Management (EM)

    Nuclear Facility Decontamination and Decommissioning-Brookhaven Graphite Research Reactor ... Schedule Success? Brookhaven National Lab, NY Nuclear Facility Decontamination and ...

  15. LANSCE | Materials Test Station

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Training Office Contact Administrative nav background Materials Test Station dotline ... Materials Test Station: the Preferred Alternative When completed, the Materials Test ...

  16. Bioenergy Success Stories

    Office of Environmental Management (EM)

    61 Bioenergy Success Stories en Largest Cellulosic Ethanol Plant in the World Opened in October http:energy.goveeresuccess-storiesarticleslargest-cellulosic-ethanol-plant-wor...

  17. Water Success Stories

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Water Success Stories en Catching a Wave: Innovative Wave Energy Device Surfs for Power in Hawaii http:energy.goveeresuccess-storiesarticlescatching-wave-innovative-wave-en...

  18. Small Business Success Stories

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Small Business Program recognizes small businesses that have successfully supported EERE through various contracting efforts.

  19. Success stories spur students

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories Spur Students Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: Dec. 2015-Jan. 2016 all issues All Issues...

  20. Completed Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed Sites Completed Sites Completed Sites The Office of Environmental Management (EM) has been or is currently responsible for cleaning up sites across the United States. These sites were associated with the legacy of the nation's nuclear weapons program and other DOE research and development activities. Many of these sites have been cleaned up and transferred to other entities or to DOE's Legacy Management (LM) Program. Completed Sites Listing

  1. Completed EISs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed EISs Completed EISs Comprehensive EIS list Completed EISs (406.76 KB) More Documents & Publications Environmental Impact Statements and Environmental Assessments Status Chart NEPA Documentation 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION

  2. Multizone subsea completions in the Dai Hung field, Vietnam

    SciTech Connect (OSTI)

    Lay, K.R.

    1996-09-01

    The early production phase of the Dai Hung field development resulted in the drilling and completion of five subsea wells. Because of the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. The downhole completion designs used equipment that was primarily of existing proven design and downhole equipment installation was successfully achieved in a single trip. Ongoing reservoir management will be aided by the use of a subsea wireline system to facilitate data acquisition.

  3. Level-2 Milestone 5213. CTS-1 Contract Award Completed

    SciTech Connect (OSTI)

    Leininger, Matt

    2015-09-24

    This report documents the fact that the first commodity technology (CT) system contract award, CTS-1, has been completed. The description of the milestone is: Based on Tri-Lab CTS-1 process and review, LLNL successfully awards the procurement for the next-generation Tri-Lab Linux CTS-1. The milestone completion criterion is: Signed contract. The milestone was completed on September 24th. 2015.

  4. Operability test report for rotary mode core sampling system number 3

    SciTech Connect (OSTI)

    Corbett, J.E.

    1996-03-01

    This report documents the successful completion of operability testing for the Rotary Mode Core Sampling (RMCS) system {number_sign}3. The Report includes the test procedure (WHC-SD-WM-OTP-174), exception resolutions, data sheets, and a test report summary.

  5. Video: Energy Savings Performance Contracts Success Story-Northern

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    California TRACON | Department of Energy Energy Savings Performance Contracts Success Story-Northern California TRACON Video: Energy Savings Performance Contracts Success Story-Northern California TRACON See how Federal Energy Management Program eTraining helped energy and facility management professionals at Northern California TRACON complete a successful project using an energy savings performance contact (ESPC)

  6. NERSC Move to CRT Complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Move to CRT Complete NERSC Move to CRT Complete April 6, 2016 by Rebecca Hartman-Baker NERSC has completed the move of the vast majority of its resources from the Oakland Scientific Facility (OSF) location to the Computational Research and Theory (CRT) building at the main Berkeley Lab campus. The major components of the move were completed earlier in the year. In particular, Edison was moved from OSF to CRT and returned to service on January 4, 2016, and all the NERSC filesystems were migrated

  7. Remote multiple string well completion

    SciTech Connect (OSTI)

    Kirkland, K.G.

    1981-04-21

    Method and apparatus for multiple string well completions by remote operations in underwater installations, by which the tubing strings are installed independently rather than simultaneously.

  8. Completed Projects Table.xlsx

    Office of Environmental Management (EM)

    Completed Projects 2005-Present Approved Actual Soil and Water Remediation Soil and Water Remediation ANLE-0030 a 28 30 2007 2007 Yes Yes Yes Nuclear Facility Deactivation and ...

  9. WIPP Firefighters Complete Fire Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 24, 2016 WIPP Firefighters Complete Fire Training Members of the WIPP fire department recently participated in Live Fire Training at the Permian Basin Regional Training Center ...

  10. Interim Ventilation System Tie-in Completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2016 Interim Ventilation System Tie-in Completed Early this week sub-contractors at the Waste Isolation Pilot Plant (WIPP) completed the "tie in" of the new interim ventilation system (IVS) to the ductwork for the existing underground ventilation system. Following a series of operational tests, the IVS is expected to increase airflow in the WIPP underground by approximately 54,000 cubic feet per minute. The tie-in operation consisted of removal of sections of the existing ductwork

  11. Specialized equipment enabled completions with large coiled tubing

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-02-19

    Specialized equipment enabled successful well completions in Oman with large 3{1/2}-inch coiled tubing. Conventional drilling or completion rigs were not needed. Although the use of 3{1/2}-inch coiled tubing to complete wells is relatively new, it is gaining widespread industry application. One Middle East operating company felt that if downhole completion equipment could be successfully run using coiled tubing, greater cost efficiency, both in initial deployment and in maintenance, could be derived. The paper lists some of the technical considerations for these assumptions. The long-term advantages regarding production and well maintenance cannot yet be determined, but experience in Oman has confirmed the belief that large coiled tubing completions can be technically achieved.

  12. Pure-state informationally complete and 'really' complete measurements

    SciTech Connect (OSTI)

    Finkelstein, J.

    2004-11-01

    I construct a positive-operator-valued measure (POVM) which has 2d rank-1 elements and which is informationally complete for generic pure states in d dimensions, thus confirming a conjecture made by Flammia, Silberfarb, and Caves (e-print quant-ph/0404137). I show that if a rank-1 POVM is required to be informationally complete for all pure states in d dimensions, it must have at least 3d-2 elements. I also show that, in a POVM which is informationally complete for all pure states in d dimensions, for any vector there must be at least 2d-1 POVM elements which do not annihilate that vector.

  13. Sweet lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco Fee. Annual report, December 1, 1979-February 27, 1981. Volume I. Drilling and completion test well and disposal well

    SciTech Connect (OSTI)

    Rodgers, R.W.

    1982-06-01

    The Sweet lake site is located approximately 15 miles southeast of Lake Charles in Cameron Parish, Louisiana. A geological study showed that the major structure in this area is a graben. The dip of the beds is northwesterly into the basin. A well drilled into the deep basin would find the target sand below 18,000', at high pressures and temperatures. However, since there is no well control in the basin, the specific site was chosen on the 15,000' contour of the target sand in the eastern, more narrow part of the garben. Those key control wells are present within one mile of the test well. The information acquired by drilling the test well confirmed the earlier geologic study. The target sand was reached at 15,065', had a porosity of over 20% and a permeability to water of 300 md. The original reservoir pressure was 12,060 psi and the bottom hole temperature 299{sup 0}F. There are approximately 250 net feet of sand available for the perforation. The disposal well was drilled to a total depth of 7440'.

  14. Unique environmental remediation project on steep canyon successfully

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    completed Environmental remediation project on canyon completed Unique environmental remediation project on steep canyon successfully completed A team recently completed a remediation project that involved removing contaminated rock and soil from the parking lot of a busy shopping center. July 29, 2015 A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. A telescoping crane hoists a spider

  15. Completeness for sparse potential scattering

    SciTech Connect (OSTI)

    Shen, Zhongwei

    2014-01-15

    The present paper is devoted to the scattering theory of a class of continuum Schrdinger operators with deterministic sparse potentials. We first establish the limiting absorption principle for both modified free resolvents and modified perturbed resolvents. This actually is a weak form of the classical limiting absorption principle. We then prove the existence and completeness of local wave operators, which, in particular, imply the existence of wave operators. Under additional assumptions on the sparse potential, we prove the completeness of wave operators. In the context of continuum Schrdinger operators with sparse potentials, this paper gives the first proof of the completeness of wave operators.

  16. National Rotor Testbed aerodynamic design complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aerodynamic design complete - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  17. DOWNHOLE POWER GENERATION AND WIRELESS COMMUNICATIONS FOR INTELLIGENT COMPLETIONS APPLICATIONS

    SciTech Connect (OSTI)

    Paul Tubel

    2003-07-05

    The third quarter of the project was dedicated to creating the detailed design for the manufacturing of the mechanical system for wireless communications and the power generation module. Another emphasis for the quarter was the development of the surface system and acoustic detector for the downhole tool for 2 way communications. The tasks accomplished during this report period were: (1) All detailed drawings for manufacturing of the wireless communications gauge and power generator were completed and the drawings were forward to a machine shop for manufacturing. (2) The power generator was incorporated to the mandrel of the wireless gauge reducing the length of the tool by 25% and manufacturing cost by about 35%. (3) The new piezoelectric acoustic generator was manufactured successfully and it was delivered during this quarter. The assembly provides a new technique to manufacture large diameter piezoelectric based acoustic generators. (4) The acoustic two-way communications development progressed significantly. The real time firmware for the surface system was developed and the processor was able to detect and process the data frame transmitted from downhole. The analog section of the tool was also developed and it is being tested for filtering capabilities and signal detection and amplification. (5) The new transformer to drive the piezoelectric wafer assembly was designed and manufactured. The transformer has been received and it will go through testing and evaluation during the next quarter.

  18. NNSA Completes Fourth International Meeting on Next Generation Nuclear

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safeguards | National Nuclear Security Administration | (NNSA) NNSA Completes Fourth International Meeting on Next Generation Nuclear Safeguards July 12, 2012 HANOI, VIETNAM - The U.S. Department of Energy's National Nuclear Security Administration (NNSA), together with the Vietnam Agency for Radiation and Nuclear Safety, announced today the successful completion of the Fourth International Meeting on Next Generation Safeguards. Organized by NNSA's Next Generation Safeguards Initiative

  19. Idaho Workers Complete Last of Transuranic Waste Transfers Funded by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act | Department of Energy Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste &ndash; each weighing up to 15 tons &ndash; to a facility for repackaging and shipment to a permanent disposal location. As part of a project funded by $90 million from

  20. Success Stories | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories We'd like to share our stories about innovation, industry partnerships, and the path towards commercializing renewable energy and energy efficiency technologies developed at NREL. What Our Partners Say "The capabilities and credibility of NREL are unmatched in the technical work they provided. I have recommended them many times, and will continue to do so." - Lotus Applied Technology "Grateful for the excellent support, collaborative problem solving,

  1. PAFC History and Successes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PAFC History and Successes John Ferro Manager Product Development john.ferro@utcpower.com 2 2 AGENDA Company overview and history System description and applications Failure modes and life analysis Summary 3 3 Research Center Hamilton Sundstrand Pratt & Whitney Sikorsky UTC Power Otis Carrier UTC Fire & Security UNITED TECHNOLOGIES CORPORATION 18 th largest U.S. manufacturer (2009 list, Industry Week) 37 th largest U.S. corporation (2009 list, Fortune) 61 st largest publicly held

  2. Building on Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on Success Sandia facilities meet diverse needs for national security, research and partnerships Sandia National Laboratories' state-of-the-art facilities represent a unique set of scientific and engineering resources. They serve Sandia's national security mission and research needs. Certain facilities also are available to industry, academia, other laboratories, state and local governments and the broader scientific community. And, more than 10 percent of Sandia's building square footage is

  3. Well completion and servicing fluid

    SciTech Connect (OSTI)

    Grimsley, R.L.

    1990-09-25

    This patent describes a well completion servicing fluid for controlling formation pressure during completion or servicing of a well. It comprises: an aqueous solution of calcium chloride, a solid weighing agent suspended in the solution and being selected from the group consisting of zinc, zinc oxide, and mixtures thereof; and a viscosifier dissolved in the solution in an amount effective to suspend the weighing agent. The fluid has a density of greater than 15 pounds per gallon and being substantially free of bromide ions and being substantially free of solid material which is not soluble in hydrochloric acid.

  4. Oak Ridge's EM Program Realizes Successful 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ridge's EM Program Realizes Successful 2010 Oak Ridge's EM Program Realizes Successful 2010 February 7, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Cleanup at the Oak Ridge Reservation took a major leap forward in 2010, as the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) completed numerous projects that reduced risks, decreased the site's footprint, and paved the way for new development for DOE missions. Major accomplishments were completed across the Oak Ridge

  5. Administration Building demolition completed under budget

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Building demolition completed under budget Administration Building demolition completed under budget Project activities started in April 2009 and was completed five...

  6. Site Transition Process Upon Cleanup Completion | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup ...

  7. State Energy Program Success Stories

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30021 State Energy Program Success Stories en SEP Success Story: Energy Department Supporting Nevada's Effort to Increase Electric Vehicle Infrastructure Along Major U.S. Highway...

  8. DOE completes environmental assessment on INL National Security Test Range

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (NNSA) celebrates Earth Day Tuesday, April 22, 2014 - 4:01pm DOE today celebrated Earth Day with Community Day on the DOE Pavilion. More than 20 local green exhibitors, including various DOE departments, showcased their environmental programs. Here Fred Winter and Joyce Kim promote modernizing the grid through innovative technology. DOE celebrates Earth Day Related Topics community education environment Related News Pantex makes paper into compost Concern for the Environment Department of

  9. Innovative Drivetrain Testing for Wind Turbines Nears Completion

    Office of Energy Efficiency and Renewable Energy (EERE)

    Wind turbines wouldn't do their job without a drivetrain--and EERE's National Renewable Energy Laboratory has developed a new system that promises greater efficiency at less cost.

  10. NNSA Successfully Converts Third Domestic Research Reactor in...

    National Nuclear Security Administration (NNSA)

    Successfully Converts Third Domestic Research Reactor in the Last Year September 13, 2007 ... converted the 1-kilowatt materials test reactor (PUR-1) at Purdue University in Indiana ...

  11. EERE Success Story-Advancing Technology Readiness: Wave Energy...

    Broader source: Energy.gov (indexed) [DOE]

    Addthis Related Articles Innovative Wave Power Device Starts Producing Clean Power in Hawaii EERE Success Story-Establishing a Testing Center for Ocean Energy Technologies in the ...

  12. STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 (05-2016) OMB Control No. 1910-5122 U.S. Department of Energy (DOE) Human Reliability Program (HRP) Alcohol Testing (Instructions for completing this form are attached.) STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN A. Employee Name __________________________________________________________________ (Print) First M.I. Last B. Employee ID No. __________________________________________________________ C. Employer Name __________________________________________________________

  13. China National Machinery Industry Complete Engineering Corporation...

    Open Energy Info (EERE)

    Industry Complete Engineering Corporation CMCEC Jump to: navigation, search Name: China National Machinery Industry Complete Engineering Corporation (CMCEC) Place: Beijing,...

  14. EERE Success Story-FEMP Completes 2000th Renewable Energy Optimization...

    Broader source: Energy.gov (indexed) [DOE]

    NREL's Renewable Energy Optimization (REopt) tool, developed through FEMP funding, is a ... The Federal Energy Management Program (FEMP) works with key individuals to accomplish ...

  15. EERE Success Story—FEMP Completes 2000th Renewable Energy Optimization Screening

    Broader source: Energy.gov [DOE]

    NREL's Renewable Energy Optimization (REopt) tool, developed through FEMP funding, is a screening tool that identifies and prioritizes cost-effective renewable energy opportunities at a single site...

  16. U.S. and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies

    Broader source: Energy.gov [DOE]

    Methane Hydrates May Exceed the Energy Content of All Other Fossil Fuels Combined; Could Ensure Decades of Affordable Natural Gas and Cut America’s Foreign Oil Dependence

  17. EERE Success Story-Pilot Plant Completes Two 1,000-Hour Ethanol...

    Broader source: Energy.gov (indexed) [DOE]

    pilot plant in St. Joseph, Missouri. This is an important step toward the commercialization of cellulosic ethanol from switchgrass and energy sorghum. ICM's pilot plant is ...

  18. Subsea completion technology needs advances

    SciTech Connect (OSTI)

    Ledbetter, R.

    1995-09-18

    Subsea technology needs further advances to reduce operational costs before operators will expand the use of subsea well completions in the Gulf of Mexico. They will continue to choose surface completion-oriented systems as long as these are more economical operationally than subsea system. Designs of subsea equipment such as trees, connectors, control pods, umbilicals, and flow lines, must bring about reductions in the cost of both installation and workover compatibility. Remote operated vehicle (ROV) manipulation is one avenue that should be exploited. The bottom line is that significant cooperation between equipment manufacturers and ROV companies is needed to develop advanced ROV technology, and operators should be involved to help guide operational strategies.

  19. Complete EOS for PBX 9502

    SciTech Connect (OSTI)

    Menikoff, Ralph S

    2009-10-08

    PBX 9502 is an insensitive plastic-bonded explosive based on triamino-trinitrobenzene (TATB). A complete equation of state (EOS) is constructed for unreacted PBX 9502 suitable for reactive burn models, i.e., high pressure regime in which material strength is unimportant. The PBX EOS is composed of two parts: a complete EOS for TATB and a porosity model which allows for variations in the initial PBX density. The TATB EOS is based on a cold curve and a thermal model for lattice vibrations. The heat capacity, and hence thermal model, is determined by the vibrational spectrum from Raman scattering. The cold curve is calibrated to diamond anvil cell data for isothermal compression using a two-piece Keane fitting form. Hugoniot data for PBX 9502 is used as a consistency check.

  20. Complete liquefaction methods and apparatus

    SciTech Connect (OSTI)

    Turner, Terry D.; Wilding, Bruce M.

    2013-10-15

    A method and apparatus are described to provide complete gas utilization in the liquefaction operation from a source of gas without return of natural gas to the source thereof from the process and apparatus. The mass flow rate of gas input into the system and apparatus may be substantially equal to the mass flow rate of liquefied product output from the system, such as for storage or use.

  1. Subsea completions: Subsea continues strong

    SciTech Connect (OSTI)

    Mohr, H.O.

    1996-02-01

    Comparison of 1995 statistics to the previous three years indicates that the trend for applying subsea completions remains steady at about 80 installations per year. Consistent performance at this high level means industry maintains confidence in the technology. As recently as 1990, there was a low of 36 installations--the all-time high, prior to 1993, had been 66 during 1985. Another positive indicator is the number of identified future subsea completions, i.e., those in progress, or site-specific applications under consideration. This statistic also remains steady, with 1,340 at the end of 1995, and 1,341 and 1,315 at year-end 1994 and 1993. As a comparison, in 1989 and 1990, there were 1,083 and 976 identified. Petrobras is the leading user of subsea completions with 248, three times as many as Shell, the second most active operator. The ten tables of data shown list operating companies making the installations, where they are, what type, water depth, manufacturer and other descriptive features. Preceding discussions cover industry trends and development activity influencing the installations.

  2. Snorre subsea completions advance TFL technology

    SciTech Connect (OSTI)

    Gunnarsson, B.; Tennessen, S.H. )

    1993-01-01

    This paper reports on 1 of this two-part series overviewed downhole through-flowline (TFL) equipment used with an eccentric Y-block configuration to allow circulation through dual 3 1/2-in. Tubing strings. The subsea completions are in wells located on Saga Petroleum's Subsea Production System template, 6,500 m (21,320 ft) from the Snorre field TLP. This concluding presentation describes the systems control center based on the TLP, from which the remote TFL operations will be conducted. How the system was tested and commissioned before installation is discussed. And basic concepts of Saga's plans for a TFL-operated production logging system are illustrated.

  3. Hydrogen fracture toughness tester completion

    SciTech Connect (OSTI)

    Morgan, Michael J.

    2015-09-30

    The Hydrogen Fracture Toughness Tester (HFTT) is a mechanical testing machine designed for conducting fracture mechanics tests on materials in high-pressure hydrogen gas. The tester is needed for evaluating the effects of hydrogen on the cracking properties of tritium reservoir materials. It consists of an Instron Model 8862 Electromechanical Test Frame; an Autoclave Engineering Pressure Vessel, an Electric Potential Drop Crack Length Measurement System, associated computer control and data acquisition systems, and a high-pressure hydrogen gas manifold and handling system.

  4. Well cleanup and completion apparatus

    SciTech Connect (OSTI)

    Brieger, E.F.

    1984-03-13

    A well cleanup and completion apparatus and technique. A packer is located downhole in a borehole, and a tool string comprising a one-way vent assembly and a one-way circulating valve assembly is connected above a perforating gun. The tool string is used to run the gun downhole through the packer until the gun arrives at a location adjacent to the formation to be perforated. During this time, the packer assembly must be in a configuration which admits flow from the lower to the upper annulus. Cleaning fluid is circulated down the entire tool string to the one-way circulating valve assembly located immediately above the firing head of the gun, thereby displacing fluid from the lower annulus, and cleaning any debris from the gun firing head. The packer is next closed, the gun detonated, whereupon the formation is perforated and production fluid flows through the perforations, up the lower annulus, into the one-way vent assembly located below the packer, into the tubing, and to the surface of the ground. Accordingly, the apparatus enables the gun and the borehole annulus adjacent the gun to be cleaned, thereby assuring that the well is properly completed in a single trip into the wellbore.

  5. (SSS)GAO Metrics - Project Success 2015-04-29 1100.xls

    Broader source: Energy.gov (indexed) [DOE]

    ContractProject Management Performance Metrics FY 2015 Target FY 2015 Pre- & Post- CAP* Forecast Comment 1 Capital Asset Project Success: Complete 90% of capital asset projects at ...

  6. Success Stories | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    ... is successfully reducing these costs and providing a framework for others to do the same. ... October 27, 2015 EERE Success Story-Solar Forecasting Gets a Boost from Watson, Accuracy ...

  7. ORISE: Completion of environmental assessment at ORNL a Recovery Act

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    success ORISE's completion of environmental assessment at ORNL is a Recovery Act success Exterior of K-33 superstructure at ORNL This 2.8 million-square-foot facility known as K-33 was formerly used to house a uranium-enrichment operation during the Manhattan Project. The superstructure was one of three dozen facilities ORISE characterized under the American Recovery and Reinvestment Act-an effort that proved to be challenging due to the complexity of the facilities and the project's

  8. Case studies from Oman for coiled tubing deployed completion techniques

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-09-01

    Although the use of ultra-large coiled tubing to complete wells is relatively new, it is gaining widespread industry application. This paper will detail the equipment necessary to perform an operation of this type and will present information from several case studies in Oman in which an operator has successfully deployed completion equipment on 3-1/2-inch-OD coiled tubing. In addition to a discussion of the equipment required to perform the necessary operations, the trial parameters that were established by this operator will be given. The information presented has been selected to allow an initial evaluation to be made of coiled tubing completions in general and will help to determine whether this method can prove to be less expensive than traditional rig-based completions. The topics presented have been chosen to provide the reader with a thorough understanding of the techniques and preparation needed to execute a coiled tubing completion. The summary of experiences will conclude that this innovative completion technique can be a viable method for completing wells. Although long-term advantages regarding production and well maintenance cannot yet be determined, the operator`s experiences to date have confirmed his initial belief that use of coiled tubing in ultra-large continuous-pipe applications can be cost effective.

  9. Demonstration and Deployment Successes: Sapphire Integrated Algal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Successes: Sapphire Integrated Algal Biorefinery Demonstration and Deployment Successes: Sapphire Integrated Algal Biorefinery Demonstration and Deployment Successes Jaime Moreno, ...

  10. EERE Success Story-Washington: Enabling the Successful Transition of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Microalgae from Lab to Pond | Department of Energy Washington: Enabling the Successful Transition of Microalgae from Lab to Pond EERE Success Story-Washington: Enabling the Successful Transition of Microalgae from Lab to Pond August 21, 2013 - 12:00am Addthis Pacific Northwest National Laboratory (PNNL) and EERE's Bioenergy Technologies Office have developed a unique, high-resolution spatio-temporal Biomass Assessment Tool (BAT) that realistically addresses the critical questions of how much

  11. A compendium of energy conservation success stories

    SciTech Connect (OSTI)

    Not Available

    1988-09-01

    Three-quarters of DOE's Conservation R and D funds have been devoted to technology research and development: basic and applied research, exploratory R and D, engineering feasibility studies, pilot-scale prototype R and D, and technology demonstration. Non R and D projects have involved technology assessment program planning and analysis, model development, technology transfer and consumer information, health effects and safety research, and technical support for rule making. The success stories summarized in this compendium fall into three general categories: Completed Technology Success Stories, projects that have resulted in new energy-saving technologies that are presently being used in the private sector; Technical Success Stories, projects that have produced or disseminated important scientific/technical information likely to result in future energy savings; Program Success Stories, non-R and D activities that have resulted in nationally significant energy benefits. The Energy Conservation research and development program at DOE is managed by the Office of Conservation under the direction of the Deputy Assistant Secretary for Conservation. Three subordinate Program Offices correspond to the buildings, transportation, and industrial end-use sectors. A fourth subordinate Program Office/endash/Energy Utilization Research/endash/sponsors research and technical inventions for all end-use sectors.

  12. A Compendium of Energy Conservation Success Stories

    DOE R&D Accomplishments [OSTI]

    1988-09-01

    Three-quarters of DOE's Conservation R and D funds have been devoted to technology research and development: basic and applied research, exploratory R and D, engineering feasibility studies, pilot-scale prototype R and D, and technology demonstration. Non R and D projects have involved technology assessment program planning and analysis, model development, technology transfer and consumer information, health effects and safety research, and technical support for rule making. The success stories summarized in this compendium fall into three general categories: Completed Technology Success Stories, projects that have resulted in new energy-saving technologies that are presently being used in the private sector; Technical Success Stories, projects that have produced or disseminated important scientific/technical information likely to result in future energy savings; Program Success Stories, non-R and D activities that have resulted in nationally significant energy benefits. The Energy Conservation research and development program at DOE is managed by the Office of Conservation under the direction of the Deputy Assistant Secretary for Conservation. Three subordinate Program Offices correspond to the buildings, transportation, and industrial end-use sectors. A fourth subordinate Program Office{endash}Energy Utilization Research{endash}sponsors research and technical inventions for all end-use sectors.

  13. Engineering task plan TWRS technical baseline completion

    SciTech Connect (OSTI)

    Moore, T.L

    1996-03-08

    The Tank Waste Remediation System (TWRS) includes many activities required to remediate the radioactive waste stored in underground waste storage tanks. These activities include routine monitoring of the waste, facilities maintenance, upgrades to existing equipment, and installation of new equipment necessary to manage, retrieve, process, and dispose of the waste. In order to ensure that these multiple activities are integrated, cost effective, and necessary, a sound technical baseline is required from which all activities can be traced and measured. The process by which this technical baseline is developed will consist of the identification of functions, requirements, architecture, and test (FRAT) methodology. This process must be completed for TWRS to a level that provides the technical basis for all facility/system/component maintenance, upgrades, or new equipment installation.

  14. BPLU Completion and Verification Report

    SciTech Connect (OSTI)

    Dr. George L Mesina

    2011-09-01

    The Border Profile LU (BPLU) linear equation solver is the default solver for newer versions of RELAP5-3D. It can significantly reduce execution time compared to the previous default solver, MA18. Particularly for 3D cases, it can reduce run time by one to two orders of magnitude over MA18. However, because of some user reported failures, the MA18 solver currently must be used for coupled analyses. Over one dozen User Problems (UP) have been reported between 1999 and 2011 that involve the BPLU solver in RELAP5-3D. These issues can be combined into two categories of problems with the solver: (1) It fails when running multidimensional components with the nearly-implicit hydrodynamics advancement scheme. (2) It fails with some input models where the MA18 sparse solver does not fail. The sources of these UP have been found and corrected. The modified coding has been thoroughly tested with over 3000 test cases and on two different compute platforms. The updates are incorporated in RELAP5-3D, version 3.0.2.

  15. BPLU Completion and Verification Report

    SciTech Connect (OSTI)

    Dr. George L Mesina

    2011-09-01

    The Border Profile LU (BPLU) linear equation solver is the default solver for newer versions of RELAP5-3D. It can significantly reduce execution time compared to the previous default solver, MA18. Particularly for 3D cases, it can reduce run time by one to two orders of magnitude over MA18. However, because of some user reported failures, the MA18 solver currently must be used for coupled analyses. Over one dozen User Problems (UP) have been reported between 1999 and 2011 that involve the BPLU solver in RELAP5-3D. These issues can be combined into two categories of problems with the solver: • It fails when running multidimensional components with the nearly-implicit hydrodynamics advancement scheme. • It fails with some input models where the MA18 sparse solver does not fail. The sources of these UP have been found and corrected. The modified coding has been thoroughly tested with over 3000 test cases and on two different compute platforms. The updates are incorporated in RELAP5-3D, version 3.0.2.

  16. Complete Streets Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete Streets Resources Complete Streets Resources While transportation efficiency policies are often implemented under local governments, national and state programs can play supportive roles in reducing vehicle miles traveled. Find complete streets resources below. National Complete Streets Coalition. Back to Transportation

  17. Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Success Stories Success Stories RSS August 4, 2016 BEMOSS deployment in Equipment Bureau building in Arlington, VA, for control of lighting circuits. Photo Courtesy: BEMOSS team, Virginia Tech EERE Success Story-Software Platform Offers Underserved Smaller Buildings Sector an Innovative Solution for Cutting Energy Costs and Waste For the past two years, a team of professors and graduate students at Virginia Tech, in close consultation with industry, have been developing BEMOSS through a DOE

  18. Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Success Stories Success Stories This collection of DOE Building Technologies Office success stories highlights the positive impact of our work with businesses, industry partners, universities, and research labs to increase the use and effectiveness of affordable, energy efficient technologies and solutions. Learn how these innovative solutions are saving homeowners and businesses money on their utility bills, improving our energy independence, and protecting the environment. See more Buildings

  19. Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs

    Broader source: Energy.gov [DOE]

    ICM Inc. announced successful completion of two 1,000-hour performance runs of its patent-pending Generation 2.0 Co-Located Cellulosic Ethanol process at its cellulosic ethanol pilot plant in St....

  20. EERE Success Story-Sowing Seeds for Success: Interdisciplinary Research

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Blossoms at DOE | Department of Energy Sowing Seeds for Success: Interdisciplinary Research Blossoms at DOE EERE Success Story-Sowing Seeds for Success: Interdisciplinary Research Blossoms at DOE February 9, 2016 - 12:47pm Addthis Photo Courtesy: Solarize Connecticut Photo Courtesy: Solarize Connecticut The SunShot Initiative is well known for serving as one of the first sources of seed funding for cutting-edge solar energy technologies. At the same time, SunShot is also studying how solar

  1. Radiation Safety Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Safety Test. This form can also be picked up and filled out in the CAMD front office, rm. 107 A minimum passing score is 80% (24 out of 30) After completing the test, you will ...

  2. ER-12-1 completion report

    SciTech Connect (OSTI)

    Russell, C.E.; Gillespie, D.; Cole, J.C.; Drellack, S.L.

    1996-12-01

    The objective of drillhole ER-12-1 was to determine the hydrogeology of paleozoic carbonate rocks and of the Eleana Formation, a regional aquitard, in an area potentially downgradient from underground nuclear testing conducted in nearby Rainier Mesa. This objective was addressed through the drilling of well ER-12-1 at N886,640.26 E640,538.85 Nevada Central Coordinates. Drilling of the 1094 m (3588 ft) well began on July 19, 1991 and was completed on October 17, 1991. Drilling problems included hole deviation and hole instability that prevented the timely completion of this borehole. Drilling methods used include rotary tri-cone and rotary hammer drilling with conventional and reverse circulation using air/water, air/foam (Davis mix), and bentonite mud. Geologic cuttings and geophysical logs were obtained from the well. The rocks penetrated by the ER-12-1 drillhole are a complex assemblage of Silurian, Devonian, and Mississippian sedimentary rocks that are bounded by numerous faults that show substantial stratigraphic offset. The final 7.3 m (24 ft) of this hole penetrated an unusual intrusive rock of Cretaceous age. The geology of this borehole was substantially different from that expected, with the Tongue Wash Fault encountered at a much shallower depth, paleozoic rocks shuffled out of stratigraphic sequence, and the presence of an altered biotite-rich microporphyritic igneous rock at the bottom of the borehole. Conodont CAI analyses and rock pyrolysis analyses indicate that the carbonate rocks in ER-12-1, as well as the intervening sheets of Eleana siltstone, have been thermally overprinted following movement on the faults that separate them. The probable source of heat for this thermal disturbance is the microporphyritic intrusion encountered at the bottom of the hole, and its age establishes that the major fault activity must have occurred prior to 102.3+0.5 Ma (middle Cretaceous).

  3. Variable Speed Pumping: A Guide to Successful Applications - Executive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary | Department of Energy Variable Speed Pumping: A Guide to Successful Applications - Executive Summary Variable Speed Pumping: A Guide to Successful Applications - Executive Summary This document describes the cost and energy savings potential of pumping system applications with variable duty requirements. Variable Speed Pumping: A Guide to Successful Applications - Executive Summary (May 2004) (1.09 MB) More Documents & Publications Energy Conservation Program: Test Procedure for

  4. Sediment Properties: E-Area Completion Project

    SciTech Connect (OSTI)

    Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

    2011-04-29

    To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization

  5. Test reports for K Basins vertical fuel handling tools

    SciTech Connect (OSTI)

    Meling, T.A.

    1995-02-01

    The vertical fuel handling tools, for moving N Reactor fuel elements, were tested in the 305 Building Cold Test Facility (CTF) in the 300 Area. After fabrication was complete, the tools were functionally tested in the CTF using simulated N Reactor fuel rods (inner and outer elements). The tools were successful in picking up the simulated N Reactor fuel rods. These tools were also load tested using a 62 pound dummy to test the structural integrity of each assembly. The tools passed each of these tests, based on the performance objectives. Finally, the tools were subjected to an operations acceptance test where K Basins Operations personnel operated the tool to determine its durability and usefulness. Operations personnel were satisfied with the tools. Identified open items included the absence of a float during testing, and documentation required prior to actual use of the tools in the 100 K fuel storage basin.

  6. EERE Success Stories Website Contact | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stories Website Contact EERE Success Stories Website Contact Use this form to send us your comments, report problems, and/or ask questions about information on the EERE Success Stories website. Your Email Message Here * CAPTCHA This question is for testing whether you are a human visitor and to prevent automated spam submissions. Submit

  7. Testing of Radioactive Sludge System Proves Successful | Department of

    Office of Environmental Management (EM)

    Department of Energy Summer 2012 National Geothermal Academy: Applications Due February 15 Summer 2012 National Geothermal Academy: Applications Due February 15 January 23, 2012 - 4:02pm Addthis Course modules run from June 18 to August 10. (Download Application) The National Geothermal Academy is proud to present an intensive summer course in all aspects of geothermal energy development and utilization, held at the University of Nevada, Reno campus. The eight-week course is offered for

  8. EERE Success Story-SunShot Funding Spurs Standardized Testing...

    Energy Savers [EERE]

    Licensed photo courtesy of Lauren Wellicome. Solar inverters are one of the most important components of a solar energy system. These power electronic devices convert the direct ...

  9. EERE Success Story-Open-Source Testing Reaches New Milestone...

    Broader source: Energy.gov (indexed) [DOE]

    WEC-Sim is a numerical code developed specifically to model the multi-body dynamics and power performance of wave energy converters when subject to operational and extreme waves. ...

  10. SEP Success Story: Detroit Diesel

    Broader source: Energy.gov [DOE]

    This video features Detroit Diesel’s success with DOE’s Superior Energy Performance® (SEP™) program. Daimler’s Detroit Diesel Corporation facility earned Platinum SEP certification in November 2015...

  11. EERE Success Story-Instrumentation Database Provides a Shared Forum to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Increase Project Success | Department of Energy Instrumentation Database Provides a Shared Forum to Increase Project Success EERE Success Story-Instrumentation Database Provides a Shared Forum to Increase Project Success July 5, 2016 - 4:20pm Addthis EERE Success Story—Instrumentation Database Provides a Shared Forum to Increase Project Success Instrumentation is the Achilles' heel of testing. Due to the impact that the conditions found in marine environments place on a device's ability

  12. NREL: Transportation Research - Success Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories NREL understands real-world factors impacting industry and consumer adoption of sustainable transportation solutions, resulting in an impressive record of breaking down barriers to accelerate development and deployment of new transportation technologies. The success stories below provide a snapshot of how NREL research, development, and deployment activities translate into more energy-efficient vehicles and cleaner burning fuels, providing viable options to meet the needs of

  13. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Parker, Jeffrey J.

    2011-02-15

    DMA transfer completion notification includes: inserting, by an origin DMA engine on an origin node in an injection first-in-first-out (`FIFO`) buffer, a data descriptor for an application message to be transferred to a target node on behalf of an application on the origin node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying a packet header for a completion notification packet; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; sending, by the origin DMA engine, the completion notification packet to a local reception FIFO buffer using a local memory FIFO transfer operation; and notifying, by the origin DMA engine, the application that transfer of the message is complete in response to receiving the completion notification packet in the local reception FIFO buffer.

  14. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J. , Blocksome; Michael A. , Parker; Jeffrey J.

    2011-02-15

    Methods, systems, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA on an origin node in an origin injection FIFO, a data descriptor for an application message; inserting, by the origin DMA, a reflection descriptor in the origin injection FIFO, the reflection descriptor specifying a remote get operation for injecting a completion notification descriptor in a reflection injection FIFO on a reflection node; transferring, by the origin DMA to a target node, the message in dependence upon the data descriptor; in response to completing the message transfer, transferring, by the origin DMA to the reflection node, the completion notification descriptor in dependence upon the reflection descriptor; receiving, by the origin DMA from the reflection node, a completion packet; and notifying, by the origin DMA in response to receiving the completion packet, the origin node's processing core that the message transfer is complete.

  15. Subsea completions set for growth, standardization

    SciTech Connect (OSTI)

    Baugh, B.F.

    1988-08-22

    There have been enough subsea completion systems installed to permit categorization of some basic combinations and to permit users to choose from alternative styles. Nevertheless, advances in engineering standards, increasing capabilities, and a growing market will continue to make this an exciting area during the next 10 to 20 years. Fundamentally, subsea completion systems provide the same capabilities as surface completion and injection wells. However, they are of course more complex to accommodate special needs associated with subsea and remote operations. As of the end of 1987, there had been 472 subsea completions installed. A total of 671 future subsea completions have been identified. These completions have been characterized by differences in styles, applications, manufacturer designs, and user preferences. Subsea completions are characterized by many alternatives for construction and operation. As a result, they cannot be simply categorized by as few styles. Identifying these basic combinations gives the reader the capability to envision the alternatives which might suit his or her particular needs.

  16. System Analysis Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Analysis Success Stories System Analysis Success Stories Program Links System Analysis Success Stories Economic Impact Tools National Geothermal Data System (NGDS) Initiative

  17. Solar Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Solar Success Stories Solar Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing more efficient and less...

  18. Buildings Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Buildings Success Stories Buildings Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in technology cost reduction,...

  19. Water Success Stories | Department of Energy

    Office of Environmental Management (EM)

    Renewable Energy Water Success Stories Water Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing sustainable, ...

  20. Energy Savings Performance Contract Success Stories | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Success Stories Energy Savings Performance Contract Success Stories Fact sheet describes three case study success stories showcasing energy savings performance contract projects at ...

  1. Wind Success Stories | Department of Energy

    Office of Environmental Management (EM)

    Renewable Energy Wind Success Stories Wind Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing clean, affordable, and...

  2. Final Report: Particulate Emissions Testing, Unit 1, Potomac...

    Energy Savers [EERE]

    analytical support in completing a Particulate Emission Test of Unit 1 of the Potomac River generating facility. The Test Program at the Potomac facility involved the completion ...

  3. Uranium Processing Facility Site Readiness Subproject Completed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Successfully Establishes Uranium Lease and Takeback Program to Support Critical Medical Isotope Production Apex Gold discussion fosters international cooperation in run-up to ...

  4. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Parker, Jeffrey J.

    2010-08-17

    Methods, apparatus, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA engine on an origin compute node in an injection FIFO buffer, a data descriptor for an application message to be transferred to a target compute node on behalf of an application on the origin compute node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying an address of a completion notification field in application storage for the application; transferring, by the origin DMA engine to the target compute node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that the transfer of the message is complete, including performing a local direct put operation to store predesignated notification data at the address of the completion notification field.

  5. Guiding Principles for Successfully Implementing Industrial Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Guiding Principles for Successfully Implementing Industrial Energy Assessment ...

  6. Kaman 40-kW wind system. Phase II. Fabrication and tests. Volume II. Technical report

    SciTech Connect (OSTI)

    Howes, H; Perley, R

    1981-01-01

    A program is underway to design, fabricate and test a horizontal axis Wind Turbine Generator (WTG) capable of producing 40 kW electrical output power in a 20 mph wind. Results are presented of the program effort covering fabrication and testing of the Wing Turbine Generator designed earlier. A minimum of difficulties were experienced during fabrication and, after successful completion of Contractor tests through 20 mph winds, the WTG was shipped to Rocky Flats, assembled and operated there. The 40 kW WTG is presently undergoing extended tests at Rockwell's Rocky Flats test facility.

  7. Princeton Plasma Physics Laboratory achieves milestone, completing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton Plasma Physics Laboratory achieves milestone, completing first part of heart of ... Engineers and technicians at the U.S. Department of Energy's Princeton Plasma Physics ...

  8. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email...

  9. JOBAID-LAUNCHING AND COMPLETING ASSIGNED SURVEY

    Broader source: Energy.gov [DOE]

    The purpose of this job aid is to guide users through the step-by-step process of launching and completing assigned surverys.

  10. Specificity and completion time distributions of biochemical...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Specificity and completion time distributions of ... Using the Laplace transform of the corresponding chemical master equation, we obtain an analytical solution for the ...

  11. Floating Oscillating Water Column Reference Model Completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Floating Oscillating Water Column Reference Model Completed - Sandia Energy Energy Search ... Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 ...

  12. Complete information acquisition in scanning probe microscopy...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Complete ... Here, we report a fundamentally new approach for SPM imaging ... Type: Accepted Manuscript Journal Name: Nature ...

  13. Environmental Remediation program completes legacy mercury cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a ...

  14. Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Success Stories Success Stories Halfway into the decade-long SunShot Initiative, the nation is nearly 70% of the way to achieving SunShot's affordability goal to make solar energy fully cost-competitive with traditional energy sources by 2020. Solar energy is one of the fastest growing industries in the United States, and 2014 was a record breaking year for solar - deployment was up 40% over 2013, employment was up 22% year-over-year to 174,000 total solar workers, and solar represented 32% of

  15. Completion of the INEEL's WERF Incinerator Trial Burn

    SciTech Connect (OSTI)

    C. K. Branter; D. A. Conley; D. R. Moser; S. J. Corrigan

    1999-05-01

    This paper describes the successes and challenges associated with Resource Conservation and Recovery Act (RCRA) permitting of the Idaho National Engineering and Environmental Laboratory's (INEEL) Waste Experimental Reduction Facility (WERF) hazardous and mixed waste incinerator. Topics to be discussed include facility modifications and problems, trial burn results and lessons learned in each of these areas. In addition, a number of challenges remain including completion and final issue of the RCRA Permit and implementation of all the permit requirements. Results from the trial burn demonstrated that the operating conditions and procedures will result in emissions that are satisfactorily protective of human health, the environment, and are in compliance with Federal and State regulations.

  16. Completion of the INEEL's WERF Incinerator Trial Burn

    SciTech Connect (OSTI)

    Branter, Curtis Keith; Conley, Dennis Allen; Corrigan, Shannon James; Moser, David Roy

    1999-05-01

    This paper describes the successes and challenges associated with Resource Conservation and Recovery Act (RCRA) permitting of the Idaho National Engineering and Environmental Laboratory's (INEEL) Waste Experimental Reduction Facility (WERF) hazardous and mixed waste incinerator. Topics to be discussed include facility modifications and problems, trial burn results and lessons learned in each of these areas. In addition, a number of challenges remain including completion and final issue of RCRA Permit and implementation of all the permit requirements. Results from the trial burn demonstrated that the operating conditions and procedures will result in emissions that are satisfactorily protective of human health, the environment, and are in compliance with Federal and State regulations.

  17. Forest succession at elevated CO2

    SciTech Connect (OSTI)

    Clark, James S.; Schlesinger, William H.

    2002-02-01

    We tested hypotheses concerning the response of forest succession to elevated CO2 in the FACTS-1 site at the Duke Forest. We quantified growth and survival of naturally recruited seedlings, tree saplings, vines, and shrubs under ambient and elevated CO2. We planted seeds and seedlings to augment sample sites. We augmented CO2 treatments with estimates of shade tolerance and nutrient limitation while controlling for soil and light effects to place CO2 treatments within the context of natural variability at the site. Results are now being analyzed and used to parameterize forest models of CO2 response.

  18. Department of Energy Completes Demolition of K-33 Building -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completes Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History Department of Energy Completes Demolition of K-33 Building - Largest Completed Demo Project ...

  19. Acceptance test report for core sample trucks 3 and 4

    SciTech Connect (OSTI)

    Corbett, J.E.

    1996-04-10

    The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ``Engineering Practice Guidelines,`` Appendix M, ``Acceptance Test Procedures and Reports.`` Rotary mode core sample trucks 3 and 4 were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Successful completion of acceptance testing on June 30, 1995 verified that all design requirements were met. This report is divided into four sections, beginning with general information. Acceptance testing was performed on trucks 3 and 4 during the months of March through June, 1995. All testing was performed at the ``Rock Slinger`` test site in the 200 West area. The sequence of testing was determined by equipment availability, and the initial revision of the Acceptance Test Procedure (ATP) was used for both trucks. Testing was directed by ICF-KH, with the support of WHC Characterization Equipment Engineering and Characterization Project Operations. Testing was completed per the ATP without discrepancies or deviations, except as noted.

  20. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A.; Kumar, Sameer; Parker, Jeffrey J.

    2014-07-01

    Completion processing of data communications instructions in a distributed computing environment with computers coupled for data communications through communications adapters and an active messaging interface (`AMI`), injecting for data communications instructions into slots in an injection FIFO buffer a transfer descriptor, at least some of the instructions specifying callback functions; injecting a completion descriptor for each instruction that specifies a callback function into an injection FIFO buffer slot having a corresponding slot in a pending callback list; listing in the pending callback list callback functions specified by data communications instructions; processing each descriptor in the injection FIFO buffer, setting a bit in a completion bit mask corresponding to the slot in the FIFO where the completion descriptor was injected; and calling by the AMI any callback functions in the pending callback list as indicated by set bits in the completion bit mask.

  1. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A.; Kumar, Sameer; Jeffrey, Parker J.

    2014-06-10

    Completion processing of data communications instructions in a distributed computing environment with computers coupled for data communications through communications adapters and an active messaging interface (`AMI`), injecting for data communications instructions into slots in an injection FIFO buffer a transfer descriptor, at least some of the instructions specifying callback functions; injecting a completion descriptor for each instruction that specifies a callback function into an injection FIFO buffer slot having a corresponding slot in a pending callback list; listing in the pending callback list callback functions specified by data communications instructions; processing each descriptor in the injection FIFO buffer, setting a bit in a completion bit mask corresponding to the slot in the FIFO where the completion descriptor was injected; and calling by the AMI any callback functions in the pending callback list as indicated by set bits in the completion bit mask.

  2. Underbalanced coiled tubing sidetrack successful

    SciTech Connect (OSTI)

    Adam, J.; Berry, M.

    1995-12-18

    The technique of drilling through a completion string, underbalanced, with coiled tubing eliminated some of the problems encountered with overbalanced drilling in a group of offset wells. This project confirmed that performing drilling operations in live wells can be carried out safely and effectively. Dalen is a sour gas field in the eastern part of The Netherlands and produces from vertical fractures in the Zechstein carbonate reservoir. The proposal for Dalen 2 was to abandon the lower section of the original hole and subsequently sidetrack conventionally to the top of the reservoir, run and cement a 5-in. liner, complete the well with a 5-in. monobore completion, and install the christmas tree. This part of the operation would be performed with a workover hoist. Thereafter, a 3 3/4-in. hole would be drilled through the completion and into the reservoir, underbalanced with coiled tubing. The drilling proposal had to address a number of key issues: creating underbalanced conditions; handling sour gas production at surface; handling and treating drilling fluids at surface; removing drilled solids from the returned fluid system; and deploying a long coiled tubing drilling bottom hole assembly (BHA) into a live well. The paper discusses planning, legislative issues, well preparation, the drilling program, and lessons learned.

  3. NREL: Technology Transfer - Success Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    crews. Photo of a printer-like machine with an open lid. Innovative Way to Test Batteries Fills a Market Niche Isothermal Battery Calorimeters (IBCs), developed by NREL...

  4. Severe fuel-damage scoping test performance. [PWR

    SciTech Connect (OSTI)

    Gruen, G.E.; Buescher, B.J.

    1983-01-01

    As a result of the Three Mile Island Unit-2 (TMI-2) accident, the Nuclear Regulatory Commission has initiated a severe fuel damage test program to evaluate fuel rod and core response during severe accidents similar to TMI-2. The first test of Phase I of this series has been successfully completed in the Power Burst Facility at the Idaho National Engineering Laboratory. Following the first test, calculations were performed using the TRAC-BD1 computer code with actual experimental boundary conditions. This paper discusses the test conduct and performance and presents the calculated and measured test bundle results. The test resulted in a slow heatup to 2000 K over about 4 h, with an accelerated reaction of the zirconium cladding at temperatures above 1600 K in the lower part or the bundle and 2000 K in the upper portion of the bundle.

  5. Highlighting Successful Tribal Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Highlighting Successful Tribal Energy Projects Tribal Energy Summit: Financing Roundtable Lizana Pierce, Senior Engineer and Program Manager DOE Office of Indian Energy September 23, 2015 Strengthening Tribal Communities, Sustaining Future Generations Authorized under Title V of the Energy Policy Act (EPAct) to provide, direct, foster, coordinate, and implement energy planning, education, management, conservation, and delivery programs of the Department that- (1) promote Indian tribal energy

  6. Subjective surfaces: a geometric model for boundary completion

    SciTech Connect (OSTI)

    Sarti, Alessandro; Malladi, Ravi; Sethian, J.A.

    2000-06-01

    We present a geometric model and a computational method for segmentation of images with missing boundaries. In many situations, the human visual system fills in missing gaps in edges and boundaries, building and completing information that is not present. Boundary completion presents a considerable challenge in computer vision, since most algorithms attempt to exploit existing data. A large body of work concerns completion models, which postulate how to construct missing data; these models are often trained and specific to particular images. In this paper, we take the following, alternative perspective: we consider a reference point within an image as given, and then develop an algorithm which tries to build missing information on the basis of the given point of view and the available information as boundary data to the algorithm. Starting from this point of view, a surface is constructed. It is then evolved with the mean curvature flow in the metric induced by the image until a piecewise constant solution is reached. We test the computational model on modal completion, amodal completion, texture, photo and medical images. We extend the geometric model and the algorithm to 3D in order to extract shapes from low signal/noise ratio medical volumes. Results in 3D echocardiography and 3D fetal echography are presented.

  7. EM's Paducah Site Completes Building Removals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM's Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals Addthis

  8. EM Finds Success with Fixed-Priced Hybrid Contract Approach Benefitting Taxpayers

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM plans to complete more fixed-priced procurements in the future, and some may involve a new combination of contracting strategies proven successful at the Hanford site.

  9. Property:CompletionNotes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  10. Environmental Management Completed Projects 2005-Present

    Broader source: Energy.gov [DOE]

    This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project’s performance related to cost, schedule, and...

  11. Definition of Environmental Management (EM) Completion

    Broader source: Energy.gov [DOE]

    The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2)...

  12. Definition of Environmental Management (EM) Completion

    Office of Environmental Management (EM)

    ects is the point at which a project may proceed to Completion. Highlight 1 - Exit Strategies An exit strategy comprises the set of information that will be used to demonstrate...

  13. First trillion particle cosmological simulation completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First trillion particle cosmological simulation completed First trillion particle cosmological simulation completed A team of astrophysicists and computer scientists has created high-resolution cyber images of our cosmos. January 8, 2015 Simulation of the cosmic web of the dark matter mass distribution. This region represents about 1/10,000 of the total simulation volume. Simulation of the cosmic web of the dark matter mass distribution. This region represents about 1/10,000 of the total

  14. Lab completes Recovery Act-funded demolition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act-funded demolition completed Lab completes Recovery Act-funded demolition The building was the largest of the 24 demolished at LANL's historic Technical Area 21. January 19, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of

  15. EM Headquarters Completes Reorganization | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Completes Reorganization EM Headquarters Completes Reorganization July 28, 2016 - 1:25pm Addthis WASHINGTON, D.C. - EM headquarters is moving forward with a new organizational structure intended to further improve EM's ability to effectively and efficiently conduct cleanup activities across the DOE complex. The new structure, finalized in late July, is expected to address inefficiencies such as duplicative processes; disproportionate senior leadership reporting ratios; and a

  16. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  17. CWI Completes Pit 9 Waste Exhumation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CWI Completes Pit 9 Waste Exhumation Cleanup crews with CH2M-WG Idaho (CWI), the main cleanup contractor at the Department of Energy's Idaho Site, have completed targeted waste removal from Pit 9 several months ahead of schedule and millions of dollars under budget. About $12 million in American Recovery and Reinvestment Act savings from other cleanup projects, in addition to about $22 million in dedicated funds, were used to finance the Pit 9 project. A specially modified waste excavator was

  18. JLab Completes 100th Experiment | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes 100th Experiment JLab Completes 100th Experiment The experiment, titled "Quark Propagation through Cold QCD Matter," began its run in December 2003 and wrapped up in early March. It probed Quantum Chromodynamics (QCD), a fundamental theory of particle physics that describes the interactions of quarks and gluons - the basic building blocks of matter. A property of QCD, called confinement, states that no quark can ever be found alone. Instead, quarks combine in pairs or

  19. LANL completes CRADA with Biomagnetics, Inc.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRADA with Biomagnetics, Inc. completed LANL completes CRADA with Biomagnetics, Inc. The CRADA was created to continue work on developing a commercial product that could detect a specific biomarker in urine that could aid in the diagnosis of tuberculosis infection. September 23, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable

  20. Hefty tests buoy Philippine oil sector

    SciTech Connect (OSTI)

    Not Available

    1992-04-13

    This paper reports that Alcorn International Inc., Houston, has disclosed a test of another hefty oil flow off Philippines. Alcorn last month completed its third high flowing delineation well in the West Linapacan area off Palawan Island. Development of West Linapacan field will help boost lagging Philippines oil production, which fell 31% in 1991 from 1990 levels. Philippines Office of Energy Affairs (OEA) also outlined other aspects of the country's oil and gas activity in 1991. Recent drilling successes have redirected the country's focus north to the West Linapacan area from older Northwest Palawan oil fields. Meantime, two geophysical survey and exploration contracts (GSECs) were awarded in 1991, and two service contracts (SCs) were relinquished during the year. Several seismic program were completed last year, and in agreement between Australia and Philippines will yield added seismic data during the next 3 years.

  1. Subsea completion data show steady activity levels

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1993-02-01

    Review of subsea completion statistics indicates 45 installations during 1992 - one more than during 1991. The 45 installations are still considerably less than the all-time high of 66 installations in 1985. Petrobras continues to install three times as many subsea completions as Shell, the next most active user. However, as in the past three years, the overall-lower number of installations last year was due to reduced applications by Petrobras. During 1991, that company installed 10 subsea completions, whereas during 1988, for example, it completed 37 installations. It should be noted that reduced activity by petrobras reflects problems with financing and general activity, rather than a lack of confidence in subsea completions. The number of future subsea completions identified for installation during the next 10 years is 1,144 - some 10% more than the 1,014 identified at the end of 1991. The present planned installation figure is an all-time high; the next highest number of installations identified was 1,083 at the end of 1989. These and other statistics are presented in 10 tables. A brief analysis of each is included.

  2. NREL: Hydrogen and Fuel Cells Research - Success Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories Learn about NREL's Hydrogen Infrastructure Testing and Research Facility at the Energy Systems Integration Facility. Text Version The following success stories highlight NREL's contribution to advancements in sustainable hydrogen production and cost-effective, high-performance fuel cell systems. Learn about the R&D projects that led to these accomplishments. NREL to Collaborate with Small Clean Energy Businesses as Part of DOE Pilot Program NREL Patents Method for Continuous

  3. Solar Thermal Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories 1 Success Stories Category Title and Abstract Company Laboratories Date Solar Thermal NREL and SkyFuel Partnership Reflects Bright Future for Solar Energy Huge ...

  4. Solar Photovoltaic Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Marketing Summaries (132) Success Stories (5) Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Graphic of a ...

  5. EECBG Success Story: Cincinnati Canvassing Spreads Retrofitting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cincinnati Canvassing Spreads Retrofitting Message EECBG Success Story: Cincinnati ... Learn more. Addthis Related Articles EECBG Success Story: Another Door Opens: Marion ...

  6. 2014 Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Success Stories 2014 Success Stories EERE works toward the transition to a global clean energy economy by supporting some of America's best innovators and businesses in ...

  7. Electron Microscopy Catalysis Projects: Success Stories from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electron Microscopy Catalysis Projects: Success Stories from the High Temperature Materials Laboratory (HTML) User Program Electron Microscopy Catalysis Projects: Success Stories ...

  8. Weatherization and Intergovernmental Program Success Stories

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    820946 Weatherization and Intergovernmental Program Success Stories en SEP Success Story: Energy Department Supporting Nevada's Effort to Increase Electric Vehicle Infrastructure...

  9. EERE Successes Submission Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Download the EERE Successes submission template in PDF or Word below. Learn more about ... (PDF) File EERE Successes Template: Word More Documents & Publications How to Work ...

  10. SRNL Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graphic of a full-grown tree with many leaves. Savannah River National Laboratory Success Stories These success stories highlight some of the effective licensing and partnership...

  11. PNNL Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graphic of a full-grown tree with many leaves. Pacific Northwest National Laboratory Success Stories These success stories highlight some of the effective licensing and partnership...

  12. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A; Kumar, Sameer; Parker, Jeffrey J

    2014-05-20

    Completion processing of data communications instructions in a distributed computing environment, including receiving, in an active messaging interface (`AMI`) data communications instructions, at least one instruction specifying a callback function; injecting into an injection FIFO buffer of a data communication adapter, an injection descriptor, each slot in the injection FIFO buffer having a corresponding slot in a pending callback list; listing in the pending callback list any callback function specified by an instruction, incrementing a pending callback counter for each listed callback function; transferring payload data as per each injection descriptor, incrementing a transfer counter upon completion of each transfer; determining from counter values whether the pending callback list presently includes callback functions whose data transfers have been completed; calling by the AMI any such callback functions from the pending callback list, decrementing the pending callback counter for each callback function called.

  13. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A.; Kumar, Sameer; Parker, Jeffrey J.

    2014-06-03

    Completion processing of data communications instructions in a distributed computing environment, including receiving, in an active messaging interface (`AMI`) data communications instructions, at least one instruction specifying a callback function; injecting into an injection FIFO buffer of a data communication adapter, an injection descriptor, each slot in the injection FIFO buffer having a corresponding slot in a pending callback list; listing in the pending callback list any callback function specified by an instruction, incrementing a pending callback counter for each listed callback function; transferring payload data as per each injection descriptor, incrementing a transfer counter upon completion of each transfer; determining from counter values whether the pending callback list presently includes callback functions whose data transfers have been completed; calling by the AMI any such callback functions from the pending callback list, decrementing the pending callback counter for each callback function called.

  14. Snorre subsea completions advance TFL technology

    SciTech Connect (OSTI)

    Gunnarsson, B.; Tonnessen, S.H. )

    1992-12-01

    Well-service operations on subsea completions at Saga Petroleum's Snorre field performed by TFL (through-flowline) methods. These operations will be carried out by an innovative system that advances the state-of-the-art for TFL technology. The initial field development phase for Snorre includes 10 subsea wells mounted no a large template known as the Subsea Production System, or SPS. The 2 [times] 10 well slot arrangement on the SPS allows additional wells to be drilled as needed to replace the original ten. The template is located 6,500 m (21,320 ft) from the Snorre TLP and is connected to it by two 8-in. production lines, one 8-in. water injection line and two 3-in.-ID TFL service lines. The wells will be completed with dual 3 1/2-in. Tubing strings for TFL service operations. This article will overview the Snorre TFL system and discuss completion design.

  15. Subsea completions: A record year in '93

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1994-02-01

    Review of subsea completion statistics for 1993 shows 78 installations--an 18% increase over the previous all-time high of 66 installations during 1985. Risking some dramatics, the 78 installations during '93 represent a 73% increase over the 45 installations during '92. And enthusiasm and positive outlook for continued application of subsea completions is clearly indicated in all major areas of the offshore world. Data suggest that the activity should continue to rise strongly toward the year 2000. At the end of 1993, the number of future subsea completions identified for installation during the next 10 years is 1,315--up 15% from the 1,144 identified at year-end 1992. The next highest number identified was 1,083 at the end of 1989, supporting a positive trend.

  16. Superconducting radio-frequency modules test faciilty operating experience

    SciTech Connect (OSTI)

    Soyars, W.; Bossert, R.; Darve, C.; Degraff, B.; Klebaner, A.; Martinez, A.; Pei, L.; Theilacker, J.; /Fermilab

    2007-07-01

    Fermilab is heavily engaged and making strong technical contributions to the superconducting radio-frequency research and development program (SRF R&D). Four major SRF test areas are being constructed to enable vertical and horizontal cavity testing, as well as cryomodule testing. The existing Fermilab cryogenic infrastructure has been modified to service Fermilab SRF R&D needs. The first stage of the project has been successfully completed, which allows for distribution of cryogens for a single cavity cryomodule using the existing Cryogenic Test Facility (CTF) that houses three Tevatron satellite refrigerators. The cooling capacity available for cryomodule testing at MDB results from the liquefaction capacity of the CTF cryogenic system. The cryogenic system for a single 9-cell cryomodule is currently operational. The paper describes the status, challenges and operational experience of the initial phase of the project.

  17. Video: O&M Best Practices for Small-Scale PV Systems Success Story |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy O&M Best Practices for Small-Scale PV Systems Success Story Video: O&M Best Practices for Small-Scale PV Systems Success Story See how the Federal Energy Management Program's eTraining course, O&M Best Practices for Small-Scale PV Systems, helped federal energy and facility management professionals complete successful photovoltaics (PV) projects

  18. Video: O&M Best Practices for Small-Scale PV Systems Success Story |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Video: O&M Best Practices for Small-Scale PV Systems Success Story Video: O&M Best Practices for Small-Scale PV Systems Success Story See how the Federal Energy Management Program's eTraining course, O&M Best Practices for Small-Scale PV Systems, helped federal energy and facility management professionals complete successful photovoltaics (PV) projects.

  19. Coaxial test fixture

    DOE Patents [OSTI]

    Praeg, W.F.

    1984-03-30

    This invention pertains to arrangements for performing electrical tests on contact material samples, and in particular for testing contact material test samples in an evacuated environment under high current loads. Frequently, it is desirable in developing high-current separable contact material, to have at least a preliminary analysis of selected candidate conductor materials. Testing of material samples will hopefully identify materials unsuitable for high current electrical contact without requiring incorporation of the materials into a completed and oftentimes complex structure.

  20. NREL Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graphic of a full-grown tree with many leaves. National Renewable Energy Laboratory Success Stories These success stories highlight some of the effective licensing and partnership activity between National Renewable Energy Laboratory and industry. Success Stories 8 Success Stories Category Title and Abstract Company / Laboratories Date Electricity Transmission Solar Photovoltaic Commonwealth Scientific and Industrial Research Organisation NREL has joined forces with Australia's Commonwealth

  1. Weatherization and Intergovernmental Program Success Stories

    Broader source: Energy.gov [DOE]

    Weatherization and Intergovernmental Programs Office (WIPO) success stories, news clips, and press releases.

  2. Continuous-flow stirred-tank reactor 20-L demonstration test: Final report

    SciTech Connect (OSTI)

    Lee, D.D.; Collins, J.L.

    2000-02-01

    One of the proposed methods of removing the cesium, strontium, and transuranics from the radioactive waste storage tanks at Savannah River is the small-tank tetraphenylborate (TPB) precipitation process. A two-reactor-in-series (15-L working volume each) continuous-flow stirred-tank reactor (CSTR) system was designed, constructed, and installed in a hot cell to test the Savannah River process. The system also includes two cross-flow filtration systems to concentrate and wash the slurry produced in the process, which contains the bulk of radioactivity from the supernatant processed through the system. Installation, operational readiness reviews, and system preparation and testing were completed. The first test using the filtration systems, two CSTRs, and the slurry concentration system was conducted over a 61-h period with design removal of Cs, Sr, and U achieved. With the successful completion of Test 1a, the following tests, 1b and 1c, were not required.

  3. Completion report for well ER-30-1

    SciTech Connect (OSTI)

    1995-12-01

    Well ER-30-1 was drilled for the U.S. Department of Energy (DOE), Nevada Operations Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS). IT Corporation (IT) was the principal environmental contractor for the project. The roles and responsibilities of IT and other contractors involved in the project are described in the Raytheon Services Nevada (RSN) Drilling and Completion Programs and the Underground Test Area Operable Unit Project Management Plan. The Well ER-30-1 investigation is part of the DOE`s Underground Test Area (UGTA) Project at the NTS, the goals of which include collecting geological, geophysical, hydrological, and water-chemistry data from new and existing wells to define groundwater migration pathways, rates of migration, and groundwater quality at the NTS. The well will become part of the UGTA monitoring well network.

  4. DOE Completes Five Recovery Act Projects

    Broader source: Energy.gov [DOE]

    DOE's EM program recently completed five projects at the Oak Ridge site funded through the Recovery Act. The projects included the expansion of two landfills at the Oak Ridge Reservation (ORR) and pre-demolition and demolition projects at ETTP and Y-12.

  5. Method and apparatus for multiple well completion

    SciTech Connect (OSTI)

    Lawson, J.E.

    1982-06-08

    Method and apparatus for multiple well completion, in which a multiple string tubing hanger or like component is equipped with a gapped flange to accept dependent splines on the handling tool and on the production upper body to establish precise orientation of the production upper body.

  6. STIMULATION TECHNOLOGIES FOR DEEP WELL COMPLETIONS

    SciTech Connect (OSTI)

    Stephen Wolhart

    2003-06-01

    The Department of Energy (DOE) is sponsoring a Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a project to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. Phase 1 was recently completed and consisted of assessing deep gas well drilling activity (1995-2007) and an industry survey on deep gas well stimulation practices by region. Of the 29,000 oil, gas and dry holes drilled in 2002, about 300 were drilled in the deep well; 25% were dry, 50% were high temperature/high pressure completions and 25% were simply deep completions. South Texas has about 30% of these wells, Oklahoma 20%, Gulf of Mexico Shelf 15% and the Gulf Coast about 15%. The Rockies represent only 2% of deep drilling. Of the 60 operators who drill deep and HTHP wells, the top 20 drill almost 80% of the wells. Six operators drill half the U.S. deep wells. Deep drilling peaked at 425 wells in 1998 and fell to 250 in 1999. Drilling is expected to rise through 2004 after which drilling should cycle down as overall drilling declines.

  7. DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife

  8. Geothermal Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy » Geothermal Success Stories Geothermal Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in finding, accessing, and using U.S. geothermal resources effectively and consistently pave the way for widespread adoption of this energy resource. Explore EERE's geothermal success stories below. August 3, 2016 Photo Courtesy: Trabits Group EERE Success Story-Geothermal Wells: Advancing the Technology Geothermal resources are reservoirs of hot

  9. EERE Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Success Stories EERE Success Stories EERE Success Story-Revolutionary Refrigeration Motor Slashes Supermarket Energy Usage EERE Success Story-Revolutionary Refrigeration Motor Slashes Supermarket Energy Usage Through a DOE Small Business Innovation Research (SBIR) grant, Kansas City, Missouri-based QM Power recently commercialized a high-efficiency motor for commercial refrigerators that has the potential to revolutionize the market. Read more EERE Success Story-Energy-Efficient Heat Pump

  10. Vehicles Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Transportation » Vehicles Success Stories Vehicles Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing energy-efficient and environmentally friendly vehicle and fuel technologies translate into cleaner cars on the road today and more efficient cars in the years to come. Explore EERE's vehicle technologies success stories below. July 26, 2016 EERE Success Story-Multi-Material Lightweight Vehicle Helps Bring Technologies to Market

  11. Bioenergy Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Transportation » Bioenergy Success Stories Bioenergy Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing sustainable, cost-competitive biofuels, bioproducts, and biopower translate into clean, affordable fuels for the cars and trucks of today and tomorrow, and products and power that can help reduce dependence on fossil fuels. Explore EERE's bioenergy success stories below. February 10, 2016 EERE Success Story-EERE National

  12. Carbon Storage Partner Completes First Year of CO2 Injection Operations in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Illinois | Department of Energy Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois November 19, 2012 - 12:00pm Addthis Washington, DC - A project important to demonstrating the commercial viability of carbon capture, utilization and storage (CCUS) technology has completed the first year of injecting carbon dioxide (CO2) from an industrial plant at a large-scale test site in

  13. RTG performance on Galileo and Ulysses and Cassini test results

    SciTech Connect (OSTI)

    Kelly, C.E.; Klee, P.M.

    1997-01-01

    Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Similar comparisons are made for the RTG on the Ulysses spacecraft which completed its planned mission in 1995. Also presented are test results from small scale thermoelectric modules and full scale converters performed for the Cassini program. The Cassini mission to Saturn is scheduled for an October 1997 launch. Small scale module test results on thermoelectric couples from the qualification and flight production runs are shown. These tests have exceeded 19,000 hours are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. Test results are presented for full scale units both ETGs (E-6, E-7) and RTGs (F-2, F-5) along with mission power predictions. F-5, fueled in 1985, served as a spare for the Galileo and Ulysses missions and plays the same role in the Cassini program. It has successfully completed all acceptance testing. The ten years storage between thermal vacuum tests is the longest ever experienced by an RTG. The data from this test are unique in providing the effects of long term low temperature storage on power output. All ETG and RTG test results to date indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of at least five percent are predicted. {copyright} {ital 1997 American Institute of Physics.}

  14. RTG performance on Galileo and Ulysses and Cassini test results

    SciTech Connect (OSTI)

    Kelly, C. Edward; Klee, Paul M.

    1997-01-10

    Power output from telemetry for the two Galileo RTGs are shown from the 1989 launch to the recent Jupiter encounter. Comparisons of predicted, measured and required performance are shown. Similar comparisons are made for the RTG on the Ulysses spacecraft which completed its planned mission in 1995. Also presented are test results from small scale thermoelectric modules and full scale converters performed for the Cassini program. The Cassini mission to Saturn is scheduled for an October 1997 launch. Small scale module test results on thermoelectric couples from the qualification and flight production runs are shown. These tests have exceeded 19,000 hours are continuing to provide increased confidence in the predicted long term performance of the Cassini RTGs. Test results are presented for full scale units both ETGs (E-6, E-7) and RTGs (F-2, F-5) along with mission power predictions. F-5, fueled in 1985, served as a spare for the Galileo and Ulysses missions and plays the same role in the Cassini program. It has successfully completed all acceptance testing. The ten years storage between thermal vacuum tests is the longest ever experienced by an RTG. The data from this test are unique in providing the effects of long term low temperature storage on power output. All ETG and RTG test results to date indicate that the power requirements of the Cassini spacecraft will be met. BOM and EOM power margins of at least five percent are predicted.

  15. UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITY

    SciTech Connect (OSTI)

    Joel W. Muehlhauser

    2004-07-21

    In this final technical report, UTSI summarizes work completed under DOE Contract No. DE-AC22-95PC95231. This work began on the contract effective date, September 15, 1995 and is continuing on a very small basis to complete the groundwater remediation as of this date. The work scope required UTSI to continue to maintain the DOE Coal Fired Flow Facility and keep it in readiness for anticipated testing. This effort was terminated in September 1998 by DOE stop-work letter. Work continued on reporting, environmental restoration and on the High Temperature Superconductivity work that was underway. The work included preparing reports on the MHD POC tests that had been completed just prior to this contract initiation under an earlier contract with DOE Chicago. These four reports are summarized herein. This report summarizes the environmental restoration work performed under the contract, including groundwater monitoring and remediation, removal of wastes from the facility, removal of asbestos from the cooling tower and actions in compliance with the license to discharge water into Woods Reservoir. This report covers work in support of the DOE High Temperature Superconductivity program including: (1) Assistance to DOE in preparing a development plan; (2) Cooperation with industry, national laboratories and other universities to promote the commercialization of thin film superconductors (coated conductors); (3) Process Evaluations; (4) Process Diagnostic Development; and (5) Process Economics. The assistance to DOE task included convening an advisory board composed of all the major participants in the DOE program and preparing a draft development plan and Research and Development Roadmap leading to commercialization of the coated conductor technology. Under this program, cooperative agreements and cooperative work was undertaken with Oak Ridge National Laboratory, Midwest Superconductivity, Inc., EURUS Technologies, Inc., Westinghouse Electric Company, and others. In the

  16. Geopressured-geothermal well report. Volume I. Drilling and completion

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    Gladys McCall site activities are covered through the completion of the test well and salt water disposal well. The test well was drilled to a total depth of 16,510 feet, then plugged back to 15,831 feet. Three 4'' diameter diamond cores were taken for analysis. An existing well on site, the Getty-Butts Gladys McCall No. 1, was reentered and completed to a depth of 3514 feet as a salt water disposal well. The geologic interpretation of the Gladys McCall site indicated target sands for testing at 15,080 feet through 15, 831 feet. Reservoir fluid temperature at this depth is estimated to be approximately 313/sup 0/F and pressure is estimated to be +-12,800 psi. The preliminary reservoir volume estimate is 3.6 billion barrels of brine. The design wells program includes environmental monitoring of the Gladys McCall site by Louisiana State University. Field stations are set up to monitor surface and ground water quality, subsidence, land loss and shoreline erosion, and seismicity. As of December 31, 1981 the study shows no significant impact on the environment by site operations.

  17. Pilot Plant Completes Two 1,000-Hour Ethanol Performance Runs

    Broader source: Energy.gov [DOE]

    ICM Inc. announced successful completion of two 1,000-hour performance runs of its patent-pending Generation 2.0 Co-Located Cellulosic Ethanol process at its cellulosic ethanol pilot plant in St. Joseph, Missouri. This is an important step toward the commercialization of cellulosic ethanol from switchgrass and energy sorghum.

  18. Recent results from the Spacecraft Fabrication and Test MODIL

    SciTech Connect (OSTI)

    Saito, T.T.

    1993-04-01

    The Spacecraft Fabrication and Test Manufacturing Operations Development and Integration Laboratory (SF&T MODIL) is working with SDIO program offices and contractors to reduce schedule and budget risks for SDIO systems as they go into production. The concurrent engineering thrust has identified potential high payoff areas. A materials and structures demonstration project has been successfully completed in partial automated closing of matched metal molds for a continuous fiber composite. In addition to excellent accuracy, the parts demonstrated excellent predictability and repeatability of physical properties. The cryocooler thrust successfully demonstrated and inserted precision technologies into a generic cryocooler part. The precision technologies thrust outlined two potentially high payoff areas in precision alignment and miniature rocket thrust measurement. The Producible Technology Working Group (PTWG) efforts identified the need for a test and assembly thrust. Due to funding limitations, continuing efforts are limited to the cryocooler thrust.

  19. Complete genome sequences for the anaerobic, extremely thermophilic...

    Office of Scientific and Technical Information (OSTI)

    Complete genome sequences for the anaerobic, extremely thermophilic plant ... Title: Complete genome sequences for the anaerobic, extremely thermophilic plant ...

  20. Critical success factors in implementing process safety management

    SciTech Connect (OSTI)

    Wilson, D.J. [Chevron USA, Inc., New Orleans, LA (United States)

    1996-08-01

    This paper focuses on several {open_quotes}Critical Success Factors {close_quotes} which will determine how well employees will embrace and utilize the changes being asked of them to implement Process Safety Management (PSM). These success factors are applicable to any change which involves asking employees to perform activities differently than they are currently performing them. This includes changes in work processes (the way we arrange and conduct a set of tasks) or changes in work activities (how we perform individual tasks). Simply developing new work processes and explaining them to employees is not enough to ensure that employees will actually utilize them -- no matter how good these processes are. To ensure successful, complete implementation of Process Safety Management, we must manage the transition from how we perform our work now to how we will perform it after PSM is implemented. Environmental and safety performance improvements, facility reliability and operability increases, and employee effectiveness and productivity gains CAN NOT be achieved until Process Safety Management processes are fully implemented. To successfully implement management of change, mechanical integrity, or any of the other processes in PSM, each of the following critical success factors must be carefully considered and utilized as appropriate. They are: (1) Vision of a Future State, Current State Assessment, and a Detailed Plan to Achieve the Future State, (2) Management Commitment, (3) Ownership by Key Individuals, (4) Justification for Actions, (5) Autonomy to Customize the Process, (6) Feedback Mechanism to Adjust Activities, and (7) Process to Refocus & Redirect Efforts.

  1. Complete Fiber/Copper Cable Solution for Long-Term Temperature and Pressure Measurement in Supercritical Reservoirs and EGS Wells

    SciTech Connect (OSTI)

    Pastouret, Alan; Gooijer, Frans; Overton, Bob; Jonker, Jan; Curley, Jim; Constantine, Walter; Waterman, Kendall Miller

    2015-11-13

    -temperature insulated wire conductors Prysmian Group has developed a geothermal fiber optic cable (GFOC) solution which incorporates novel glass chemistry for optical fibers to operate at the required bandwidths in high temperature/high pressure hydrogen rich environments with fiber protection, high temperature insulated conductors and protective cladding for cable components. The cable solution has been tested in a geothermal installation for 10 months. The electrical insulation and optical fibers have been validated through laboratory testing to ensure successful operation for greater than 5 years at 300°C, with the possibility of higher temperatures depending on the particular well environment. With the 300°C optical fiber and electrical insulation developments completed and validated in laboratory tests the greatest challenge to a complete 300°C cable solution was protecting the optical fibers in the cable. Optical fibers are typically incased in a protective tube where the tube is filled with a gel. The gel serves as mechanical protection, prevent moisture ingress, and can include hydrogen scavenging materials. A suitable gel for use at 300°C could not be identified and an industrialized alternative was not fully attained. Despite the problems encountered and the lower long-term operating temperature of the cable solution, the project showed success in developing a complete cable solution for a large portion of the geothermal wells in operation today. Further work to obtain the higher long-term temperature goal of the project can be achieved based on the knowledge gained in the current project. This project is significant for many reasons including the new materials science, manufacturing technology, energy independence, and jobs created and will create.

  2. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL Recovery Act cleanup Lab completes first Recovery Act cleanup project The $13 million project involved demolition of an 18,000-square-foot former nuclear fusion research facility. August 4, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits

  3. Complete Project List | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Project List Researchers at the Critical Materials Institute work to find ways to diversify supplies of critical materials, develop substitutes, improve reuse and recycling, enable research, sustain the environment, study the supply chain and analyze economics. The institute started with more than 30 projects. Over time, some have merged or ended and others have been added. This page provides a list of the current CMI projects, which can be sorted by clicking on a column header. Project

  4. B61-12 Life Extension Program Undergoes First Full-Scale Wind Tunnel Test |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) B61-12 Life Extension Program Undergoes First Full-Scale Wind Tunnel Test April 14, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) announced today that its Sandia National Laboratories successfully completed the first full-scale wind tunnel test of the B61-12 as part of the NNSA's ongoing effort to refurbish the B61 nuclear bomb. The purpose of this test was to characterize counter torque, the interaction between

  5. Solar Success Stories | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    ... is successfully reducing these costs and providing a framework for others to do the same. ... October 27, 2015 EERE Success Story-Solar Forecasting Gets a Boost from Watson, Accuracy ...

  6. Communicating Success: Measuring Improvements, Sharing Results

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assistance Program (TAP), provides information on how to best communicate success.

  7. Success Story: Alcoa and ArcelorMittal

    Broader source: Energy.gov [DOE]

    Profile success story on Alcoa and ArcelorMittal for the American Energy and Manufacturing Competitiveness Summit.

  8. INL Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graphic of a full-grown tree with many leaves. Idaho National Laboratory Success Stories These success stories highlight some of the effective licensing and partnership activity between Idaho National Laboratory and industry. Success Stories 1 Success Stories Category Title and Abstract Company / Laboratories Date Advanced Materials High Strength Nano-Structured Steel The NanoSteel Company Complex modern challenges are driving new industrial market demands for metal alloys with properties and

  9. LBL Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graphic of a full-grown tree with many leaves. Lawrence Berkeley National Laboratory Success Stories These success stories highlight some of the effective licensing and partnership activity between Lawrence Berkeley National Laboratory and industry. Success Stories 1 Success Stories Category Title and Abstract Company / Laboratories Date Biomass and Biofuels Building Energy Efficiency Hydrogen and Fuel Cell Berkeley Lab Startup Brings Fuel Cells to the Developing World In some parts of the

  10. Weatherization Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency » Weatherization Success Stories Weatherization Success Stories The Office of Energy Efficiency and Renewable Energy's (EERE) successes in providing weatherization services for existing residential and multifamily housing with low-income residents reduce energy bills for residents. Explore EERE's weatherization success stories below. April 12, 2016 These before and after photos of Lake Oroville in Northern California show the dramatic results of extended years of drought.

  11. Weatherization and Intergovernmental Program Success Stories | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy About the Office » Weatherization and Intergovernmental Program Success Stories Weatherization and Intergovernmental Program Success Stories RSS U.S. Department of Energy (DOE) Weatherization and Intergovernmental Programs Office (WIP) success stories are listed below by program. Energy Efficiency and Conservation Block Grant Program State Energy Program Weatherization Assistance Program. You can also read all WIP success stories below. April 7, 2016 These before and after photos

  12. Wind Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy » Wind Success Stories Wind Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing clean, affordable, and reliable domestic wind power tap into enormous energy-saving potential across the United States. Explore EERE's wind power success stories below. July 18, 2016 An Energy Department buoy that recently ended a 19-month deployment off Virginia Beach, Virginia, collected a wealth of data that is now available to help offshore

  13. Equal Employment Opportunity: Collaborating for Mission Success

    National Nuclear Security Administration (NNSA)

    Success NNSA EEO Program Office of Civil ... http:nnsa.energy.govaboutusouroperationsmanagementandbudgetcivrights PAGE ... and interested communities of the workforce ...

  14. Homes Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Homes Success Stories Homes Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in technology commercialization and deployment, cost reduction, and better practices to save energy in homes address an important need to adopt clean, efficient, energy-saving solutions where we live. Explore EERE's success stories in homes below. March 17, 2016 The University of Maryland used direct metal printing-a 3D printing technology-to manufacture a unique miniaturized

  15. Manufacturing Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Manufacturing Success Stories Manufacturing Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) successes in developing technologies and processes for more efficient energy management systems create big opportunities for energy savings and new jobs in manufacturing. Explore EERE's manufacturing success stories below. July 7, 2016 A pilot-scale polymerization reactor sits in the middle, with the ACOMP system on the left side and the control interface on the right

  16. Sustainable Transportation Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Transportation Success Stories Sustainable Transportation Success Stories Sustainable Transportation Success Stories The Office of Energy Efficiency and Renewable Energy's (EERE) successes in converting tax dollars into sustainable transportation solutions are important steps in the drive toward cleaner vehicles for all purposes. Learn how EERE's investments in bioenergy, hydrogen and fuel cell research, and vehicle technologies are putting electric drive vehicles on the road and

  17. Evaluation and Characterization of Lightweight Materials: Success...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization of Lightweight Materials: Success Stories from the High Temperature Materials Laboratory (HTML) User Program Evaluation and Characterization of Lightweight...

  18. BNL Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Graphic of a full-grown tree with many leaves. Brookhaven National Laboratory Success Stories These success stories highlight some of the effective licensing and partnership activity between Brookhaven National Laboratory and industry. Success Stories 1 Success Stories Category Title and Abstract Company / Laboratories Date Advanced Materials From Laboratory to Industry: Unlocking the Potential of Graphene Graphene, the much-vaunted "super material" that catapulted onto the materials

  19. Geopressured geothermal drilling and completions technology development needs

    SciTech Connect (OSTI)

    Maish, A.B.

    1981-03-01

    Geopressured geothermal formations found in the Texas and Louisiana gulf coast region and elsewhere have the potential to supply large quantities of energy in the form of natural gas and warm brine (200 to 300/sup 0/F). Advances are needed, however, in hardware technology, well design technology, and drilling and completion practices to enable production and testing of exploratory wells and to enable economic production of the resource should further development be warranted. This report identifies needed technology for drilling and completing geopressured geothermal source and reinjection wells to reduce the cost and to accelerate commercial recovery of this resource. A comprehensive prioritized list of tasks to develop necessary technology has been prepared. Tasks listed in this report address a wide range of technology needs including new diagnostic techniques, control technologies, hardware, instrumentation, operational procedure guidelines and further research to define failure modes and control techniques. Tasks are organized into the functional areas of well design, drilling, casing installation, cementing, completions, logging, brine reinjection and workovers.

  20. Guiding Principles for Successfully Implementing Industrial Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment Recommendations | Department of Energy Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations This implementation guide provides key principles and activities that will lead to the successful implementation of recommendations during energy assessments. Implementation Guidebook (April 2011) (7.11 MB) More Documents & Publications Unveiling the

  1. Secondary succession: insect-plant relationships

    SciTech Connect (OSTI)

    Brown, V.K.

    1984-12-01

    Botanists have dominated the study of secondary succession, and as a result, models and theories have focused on plants. Recent work, however, has revealed several complex relationships between plants and insects during succession, including adaptations of life-cycle strategies. Furthermore, insect herbivores play a key role in the course and rate of plant succession.

  2. Crosscutting Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crosscutting Success Stories Crosscutting Success Stories RSS The Office of Energy Efficiency and Renewable Energy's (EERE) crosscutting successes demonstrate how investments in marketplace and workforce development, as well as industry partnerships, encourage the adoption of energy efficiency and renewable energy technologies. Learn how EERE's crosscutting investments are overcoming barriers to development, commercialization, and deployment of clean energy technologies. February 10, 2016 EERE

  3. One Bacterial Cell, One Complete Genome

    SciTech Connect (OSTI)

    Woyke, Tanja; Tighe, Damon; Mavrommatis, Konstantinos; Clum, Alicia; Copeland, Alex; Schackwitz, Wendy; Lapidus, Alla; Wu, Dongying; McCutcheon, John P.; McDonald, Bradon R.; Moran, Nancy A.; Bristow, James; Cheng, Jan-Fang

    2010-04-26

    While the bulk of the finished microbial genomes sequenced to date are derived from cultured bacterial and archaeal representatives, the vast majority of microorganisms elude current culturing attempts, severely limiting the ability to recover complete or even partial genomes from these environmental species. Single cell genomics is a novel culture-independent approach, which enables access to the genetic material of an individual cell. No single cell genome has to our knowledge been closed and finished to date. Here we report the completed genome from an uncultured single cell of Candidatus Sulcia muelleri DMIN. Digital PCR on single symbiont cells isolated from the bacteriome of the green sharpshooter Draeculacephala minerva bacteriome allowed us to assess that this bacteria is polyploid with genome copies ranging from approximately 200?900 per cell, making it a most suitable target for single cell finishing efforts. For single cell shotgun sequencing, an individual Sulcia cell was isolated and whole genome amplified by multiple displacement amplification (MDA). Sanger-based finishing methods allowed us to close the genome. To verify the correctness of our single cell genome and exclude MDA-derived artifacts, we independently shotgun sequenced and assembled the Sulcia genome from pooled bacteriomes using a metagenomic approach, yielding a nearly identical genome. Four variations we detected appear to be genuine biological differences between the two samples. Comparison of the single cell genome with bacteriome metagenomic sequence data detected two single nucleotide polymorphisms (SNPs), indicating extremely low genetic diversity within a Sulcia population. This study demonstrates the power of single cell genomics to generate a complete, high quality, non-composite reference genome within an environmental sample, which can be used for population genetic analyzes.

  4. Diamond Shamrock nears completion of major expansions

    SciTech Connect (OSTI)

    True, W.R.

    1993-05-24

    With completion later this year of a second refined products line into Colorado, Diamond Shamrock Inc., San Antonio, will have added more than 600 miles of product and crude-oil pipeline on its system and expanded charge and production capacities at its two state-of-the-art refineries, all within 30 months. The projects aim at improving the company's ability to serve markets in the U.S. Southwest and increasing capacities and flexibility at its two refineries. The paper describes these projects under the following headings: new products service; another new line; and refineries, crude pipelines; Three Rivers expansion and Supplies for McKee.

  5. completed-storage | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storage Projects Completed Natural Gas Storage Projects Click on project number for a more detailed description of the project Project Number Project Name Primary Performer DE-DT0000358 Strategic Petroleum Reserve Northrop Grumman Missions System DE-FC26-03NT41813 Geomechanical Analysis and Design Criteria Terralog Technologies DE-FC26-03NT41779 natural-gas-storage Technology Consortium Pennsylvania State University (PSU) DE-FC26-03NT41743 Improved Deliverability in Gas Storage Fields by

  6. Stimulation Technologies for Deep Well Completions

    SciTech Connect (OSTI)

    Stephen Wolhart

    2005-06-30

    The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies conducted a study to evaluate the stimulation of deep wells. The objective of the project was to review U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. This report documents results from this project.

  7. Instructions For Completing Certified Payroll Report Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wage and Hour Division (WHD) Instructions For Completing Payroll Form, WH-347 * OMB Control No. 1235-0008, Expires 02/28/2018. General: Form WH-347has been made available for the convenience of contractors and subcontractors required by their Federal or Federally-aided construction-type contracts and subcontracts to submit weekly payrolls. Properly filled out, this form will satisfy the requirements of Regulations, Parts 3 and 5 (29 C.F.R., Subtitle A), as to payrolls submitted in connection

  8. Drum drop test report

    SciTech Connect (OSTI)

    McBeath, R.S.

    1995-02-28

    Testing was performed to determine actual damage to drums when dropped from higher than currently stacked elevations. The drum configurations were the same as they are placed in storage; single drums and four drums banded to a pallet. Maximum drop weights were selected based on successful preliminary tests. Material was lost from each of the single drum tests while only a small amount of material was lost from one of the pelletized drums. The test results are presented in this report. This report also provides recommendations for further testing to determine the appropriate drum weight which can be stored on a fourth tier.

  9. Picture of the Week: The Trinity Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 The Trinity Test At 5:29:45 July 16, 1945 Los Alamos scientists successfully conducted the world's first nuclear weapons test. The test, which Robert Oppenheimer named "Trinity"...

  10. Completion Design Considerations for a Horizontal Enhanced Geothermal System

    SciTech Connect (OSTI)

    Olson, Jeffrey; Eustes, Alfred; Fleckenstein, William; Eker, Erdinc; Baker, Reed; Augustine, Chad

    2015-09-02

    The petroleum industry has had considerable success in recent decades in developing unconventional shale plays using horizontal drilling and multi-zonal isolation and stimulation techniques to fracture tight formations to enable the commercial production of oil and gas. Similar well completions could be used in Enhanced Geothermal Systems (EGS) to create multiple fractures from horizontal wells. This study assesses whether well completion techniques used in the unconventional shale industry to create multi-stage fractures can be applied to an enhanced geothermal system, with a focus on the completion of the EGS injection well. This study assumes an Enhanced Geothermal System (EGS) consisting of a central horizontal injection well flanked on each side by horizontal production wells, connected to the injection well by multiple fractures. The focus is on the design and completion of the horizontal well. For the purpose of developing design criteria, a reservoir temperature of 200 degrees C (392 degrees F) and an injection well flow rate of 87,000 barrels per day (160 kg/s), corresponding to production well flow rates of 43,500 barrels per day (80 kg/s) is assumed. The analysis found that 9-5/8 inches 53.5 pounds per foot (ppf) P110 casing string with premium connections meets all design criteria for the horizontal section of injection well. A P110 grade is fairly common and is often used in horizontal sections of shale development wells in petroleum operations. Next, several zonal isolation systems commonly used in the shale gas industry were evaluated. Three techniques were evaluated -- a 'plug and perf' design, a 'sand and perf' design, and a 'packer and port' design. A plug and perf system utilizes a cemented casing throughout the length of the injector wellbore. The sand and perf system is identical to the plug and perf system, but replaces packers with sand placed in the casing after stimulation to screen out the stimulated perforated zones and provide zonal

  11. French gas-storage project nearing completion

    SciTech Connect (OSTI)

    Laguerie, P. de ); Durup, J.G. )

    1994-12-12

    Geomethane, jointly formed by Gaz de France and Geostock, is currently converting 7 of 36 solution-mined salt cavities at Manosque in southeast France from liquid hydrocarbon storage to natural-gas storage. In view of the large diameter (13 3/8 in.) of the original production wells and safety requirements, a unique high-capacity well completion has been developed for this project. It will have two fail-safe valves and a flow crossover 30 m below ground to isolate the production well in the event of problems at the surface. The project lies in the wooded Luberon Nature Reserve and due consideration has been given to locating the surface plant and blending it with the surroundings. The production wellheads are extra-low designs, the main plant was located outside the sensitive area, and the pipeline routes were landscaped. The paper discusses the history of salt cavern storage of natural gas; site characteristics; Manosque salt geology; salt mining and early storage; siting; engineering and construction; completion and monitoring; nature reserve protection; and fire and earthquake hazard mitigation.

  12. Complete Mie-Gruneisen Equation of State

    SciTech Connect (OSTI)

    Menikoff, Ralph

    2012-06-28

    The Mie-Gruneisen equation of state (EOS) is frequently used in hydro simulations to model solids at high pressure (up to a few Mb). It is an incomplete EOS characterized by a Gruneisen coefficient, {Lambda} = -V({partial_derivative}{sub e}P){sub V}, that is a function of only V. Expressions are derived for isentropes and isotherms. This enables the extension to a complete EOS. Thermodynamic consistency requires that the specific heat is a function of a single scaled temperature. A complete extension is uniquely determined by the temperature dependence of the specific heat at a fixed reference density. In addition we show that if the domain of the EOS extends to T = 0 and the specific heat vanishes on the zero isotherm then {Lambda} a function of only V is equivalent to a specific heat with a single temperature scale. If the EOS domain does not include the zero isotherm, then a specific heat with a single temperature scale leads to a generalization of the Mie-Gruneisen EOS in which the pressure is linear in both the specific energy and the temperature. Such an EOS has previously been used to model liquid nitromethane.

  13. Solar Two: A successful power tower demonstration project

    SciTech Connect (OSTI)

    REILLY,HUGH E.; PACHECO,JAMES E.

    2000-03-02

    Solar Two, a 10MWe power tower plant in Barstow, California, successfully demonstrated the production of grid electricity at utility-scale with a molten-salt solar power tower. This paper provides an overview of the project, from inception in 1993 to closure in the spring of 1999. Included are discussions of the goals of the Solar Two consortium, the planned-vs.-actual timeline, plant performance, problems encountered, and highlights and successes of the project. The paper concludes with a number of key results of the Solar Two test and evaluation program.

  14. TASK 3: PILOT PLANT GASIFIER TESTING

    SciTech Connect (OSTI)

    Fusselman, Steve

    2015-11-01

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions

  15. Completion report for Well Cluster ER-20-6

    SciTech Connect (OSTI)

    1998-02-01

    The Well Cluster ER-20-6 drilling and completion project was conducted during February, March, and April of 1996 in support of the Nevada Environmental Restoration Project at the Nevada Test Site (NTS), Nye County, Nevada. This project is part of the DOE`s Underground Test Area (UGTA) subproject at the NTS. The primary UGTA tasks include collecting geological, geophysical, and hydrological data from new and existing wells to define groundwater quality as well as pathways and rates of groundwater migration at the NTS. A program of drilling wells near the sites of selected underground nuclear tests (near-field drilling) was implemented as part of the UGTA subproject to obtain site-specific data on the nature and extent of migration of radionuclides produced by an underground nuclear explosion. The ER-20-6 near-field drilling project was originally planned to be very similar to that recently conducted at Well Cluster ER-20-5, which was designed to obtain data on the existing hydrologic regime near the site of an underground nuclear explosion (IT, 1995; IT, 1996a). However, after further consideration of the goals of the near-field drilling program and the characteristics of the BULLION site, the TWG recommended that the ER-20-6 project be redesigned to accommodate a forced-gradient experiment. This proposed experiment is expected to yield more realistic estimates of transport parameters than can be deduced from sampling and testing natural groundwater flow systems.

  16. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Chen, Dong; Giampapa, Mark E.; Heidelberger, Philip; Kumar, Sameer; Parker, Jeffrey J.; Steinmacher-Burow, Burkhard D.; Vranas, Pavlos

    2010-07-27

    Methods, compute nodes, and computer program products are provided for direct memory access (`DMA`) transfer completion notification. Embodiments include determining, by an origin DMA engine on an origin compute node, whether a data descriptor for an application message to be sent to a target compute node is currently in an injection first-in-first-out (`FIFO`) buffer in dependence upon a sequence number previously associated with the data descriptor, the total number of descriptors currently in the injection FIFO buffer, and the current sequence number for the newest data descriptor stored in the injection FIFO buffer; and notifying a processor core on the origin DMA engine that the message has been sent if the data descriptor for the message is not currently in the injection FIFO buffer.

  17. Gun below packer completion tool string

    SciTech Connect (OSTI)

    Brieger, E. F.; Colle Jr., E. A.; George, F. R.

    1985-09-03

    A perforating gun is suspended downhole in a cased borehole, in underlying relationship relative to a packer device, and adjacent to a hydrocarbon-bearing formation to be completed. A connecting tubing interconnects the gun with the packer device, and includes a rupture barrier therebetween which prevents debris from accumulating within a gun firing head. An upper tubing string is removably connected to the packer device and forms a passageway which extends from the surface of the earth, down through the packer, and to the gun firing head. The upper tubing string includes a seal means and an extension tube which sealingly engages the packer device and penetrates the rupture barrier to provide a passageway through which the gun can be fired from the surface of the earth. This combination of elements prevents malfunction of the gun when the tool is left downhole for an appreciable length of time.

  18. Completion Report for Well ER-18-2

    SciTech Connect (OSTI)

    Bechtel Nevada

    2003-09-01

    Well ER-18-2 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well, located on Buckboard Mesa in the western part of the Nevada Test Site, was drilled in the spring of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to the depth 408.1 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 762.0 meters. A preliminary composite, static, water level was measured at the depth of approximately 369.7 meters approximately two months after the completion string was installed. One completion string with three isolated, slotted intervals was installed in the well. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters and 15 sidewall samples taken at various depths below 420 meters, supplemented by geophysical log data and results of detailed chemical and mineralogical studies of rock samples. The upper part of the well penetrated Tertiary-age basalt, underlain by tuffaceous moat-filling sediments interbedded with ash-flow tuff units of the Thirsty Canyon Group and the Beatty Wash Formation. The lower half of the drill hole penetrated ash-flow tuff of the mafic-rich Ammonia Tanks Tuff. The geologic interpretation of data from Well ER-18-2 indicates that this site is located inside the structural margin of the Ammonia Tanks caldera.

  19. Completion Report for Well ER-EC-8

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-EC-8 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation program in the Western Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 129.8 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 609.6 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static water level was measured at the depth of 98.4 meters, 24 days after installation of the completion string. Detailed lithologic descriptions with stratigraphic assignments are included in the report. These are based on evaluation of composite drill cuttings collected every 3 meters, and 20 sidewall samples taken at various depths below 157.9 meters, supplemented by geophysical log data and results of detailed chemical and mineralogical studies of rock samples. Drilling began in Tertiary-age tuff of the Thirsty Canyon Group, and penetrated tuffs of the Beatty Wash Formation, tuff of Buttonhook Wash, and the upper portion of the Ammonia Tanks Tuff. The geologic interpretation of data from this well helps define the location of the western margin of the Timber Mountain caldera complex in the southwestern Nevada volcanic field. Geologic and hydrologic data from the well will aid in development of models to predict groundwater flow and contaminant migration within and near the Nevada Test Site.

  20. Department of Energy Completes Demolition of K-33 Building - Largest

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed Demo Project in Oak Ridge History | Department of Energy Completes Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History Department of Energy Completes Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History September 30, 2011 - 12:00pm Addthis Media Contact Ben Williams http://www.oakridge.doe.gov 865-576-0885 OAK RIDGE, Tenn. - The U.S. Department of Energy's Oak Ridge Environmental Management (EM) program recently completed

  1. PHASE II VAULT TESTING OF THE ARGONNE RFID SYSTEM

    SciTech Connect (OSTI)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-06-25

    The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase

  2. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in...

  3. Governor to Join Jefferson Lab in Celebrating Completion of Accelerato...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completion of Accelerator Upgrade Construction Governor to Join Jefferson Lab in Celebrating Completion of Accelerator Upgrade Construction CEBAF Race Track This aerial photo ...

  4. Nevada Proof of Completion of Work (Water Right) | Open Energy...

    Open Energy Info (EERE)

    Proof of Completion of Work (Water Right) Abstract Required notice of completion of diversion works for establishing a water right. Form Type ApplicationNotice Form Topic Proof...

  5. Energy Department Completes K-25 Gaseous Diffusion Building Demolition

    Broader source: Energy.gov [DOE]

    The five year demolition project was completed ahead of schedule and all debris shipments are expected to be completed in spring 2014.

  6. FEMP Completes 2000th Renewable Energy Optimization Screening...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP Completes 2000th Renewable Energy Optimization Screening FEMP Completes 2000th Renewable Energy Optimization Screening July 23, 2015 - 12:03pm Addthis REopt models the complex ...

  7. Modeling a complete Stirling engine (Journal Article) | DOE PAGES

    Office of Scientific and Technical Information (OSTI)

    Modeling a complete Stirling engine This content will become publicly available on March 12, 2017 Prev Next Title: Modeling a complete Stirling engine Authors: Paul, ...

  8. Category:Completed Case Study | Open Energy Information

    Open Energy Info (EERE)

    Apps Datasets Community Login | Sign Up Search Category Edit History Category:Completed Case Study Jump to: navigation, search List of geothermal areas that have a completed...

  9. Legacy Clean-up Completion Project Overview | Department of Energy

    Office of Environmental Management (EM)

    Legacy Clean-up Completion Project Overview Legacy Clean-up Completion Project Overview Topic: Bob Pfaff provided the members with information regarding the status of the Fiscal ...

  10. Temporary Bridging Agents for Use in Drilling and Completions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Temporary Bridging Agents for Use in Drilling and Completions of EGS Temporary Bridging Agents for Use in Drilling and Completions of EGS DOE Geothermal Peer Review 2010 - ...

  11. Energy Storage Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Marketing Summaries (134) Success Stories (3) Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Graphic of a full-grown

  12. Advanced Materials Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Success Stories Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Marketing Summaries (349) Success Stories (3) Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Graphic of a full-grown

  13. Hydrothermal Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrothermal Success Stories Hydrothermal Success Stories June 9, 2015 Hydrothermal Success Stories Energy Department Honored for Inroads in Geothermal Energy As renewable energy takes a stronger role in supplying the U.S. grid, geothermal power could support a more flexible role to balance the intermittent and variable capacity of wind and solar. June 5, 2015 Geothermal energy, traditionally a baseload power source among renewables, is poised to emerge also as a flexible power source, balancing

  14. CSU Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CSGF Magazine Our academic partnerships and fellowship programs are vital to the continued success of the nation's Stockpile Stewardship Program. Through them, we are able to provide exciting hands-on mentoring and professional opportunities to the next generation of stockpile stewards. Read about our Computational

    Graphic of a full-grown tree with many leaves. Colorado State University Success Stories These success stories highlight some of the effective licensing and partnership activity

  15. 2013 Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Success Stories 2013 Success Stories EERE works toward the transition to a global clean energy economy by supporting some of America's best innovators and businesses in researching, developing, demonstrating, and deploying cutting-edge technologies to break down market barriers. The national laboratories' unique science and technology capabilities play an important role in helping to move our nation toward a more sustainable future. Below are just some of the incredible successes that have

  16. Entiat 4Mile WELLs Completion Report, 2006.

    SciTech Connect (OSTI)

    Malinowksi, Richard

    2007-01-01

    The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were

  17. Communicating Success, Measuring Improvements, Sharing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy you know, amongst your staff and other colleagues and decision makers as well as externally. Communicating Success, Measuring Improvements, Sharing Results Webinar Transcript

  18. Weatherization and Energy Efficiency Success Stories | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Weatherization and Energy Efficiency Success Stories November 3, 2009 - 6:00am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory Last Friday ...

  19. Success Stories | OpenEI Community

    Open Energy Info (EERE)

    and ensure a safe and reliable energy future. Links: Check out the EDI on the EDG Big Data Commercialization Data Jam Datapalooza EDI Innovation Open Data Success Stories...

  20. Bioenergy Success Stories | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    EERE's bioenergy success stories below. November 30, 2015 The DuPont cellulosic ethanol facility in Nevada, Iowa, will produce about 30 million gallons of cellulosic ethanol...

  1. Buildings Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    planning for commercial and multi-unit residential buildings have huge energy-saving potential. Explore EERE's buildings success stories below. January 14, 2016 Image...

  2. Partnering for success: Industrial technologies program

    SciTech Connect (OSTI)

    None, None

    2004-02-01

    Partnering for Success features the R&D and industrial energy management best practices and accomplishments of manufacturers who are partnering with DOE.

  3. Hydrogen and Fuel Cells Success Stories

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71 Hydrogen and Fuel Cells Success Stories en Doosan Fuel Cell Takes Closed Plant to Full Production http:energy.goveeresuccess-storiesarticlesdoosan-fuel-cell-takes-closed-p...

  4. Freescale Semiconductor Successfully Implements an Energy Management...

    Broader source: Energy.gov (indexed) [DOE]

    Freescale Semiconductor Successfully Implements an Energy Management System The Superior Energy ... adjusting a fow controller and storage that were not being used to the ...

  5. Critical function and success path summary display

    DOE Patents [OSTI]

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1995-01-01

    The content of and hierarchical access to three levels of display pages containing information on critical function monitoring and success path monitoring.

  6. Successful Selection of LED Streetlight Luminaires: Optimizing...

    Broader source: Energy.gov (indexed) [DOE]

    This March 6, 2013 webcast reviewed the factors involved in successful selection of LED streetlight luminaires. Presenters Eric Haugaard of Cree Lighting and Chad Stalker of ...

  7. Water Success Stories | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    emissions-free, and cost-effective water power open new possibilities for this reliable, renewable resource. Explore EERE's water power success stories below. July 29, 2015 The...

  8. Pompano subsea development -- Testing program

    SciTech Connect (OSTI)

    Nelson, R.; Berger, R.; Tyer, C.

    1996-12-31

    System reliability is essential for the economic success of any subsea oil and gas development. Testing programs can be developed to prove system reliability while still adhering to cost and schedule constraints. This paper describes a three-tiered equipment testing program that was employed for the Pompano Phase 2 subsea system. Program objectives, test descriptions, procedure development and test execution are discussed in detail. Lessons learned throughout the tests are also presented.

  9. DOE Completes Sale of Northeast Home Heating Oil Stocks | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Completes Sale of Northeast Home Heating Oil Stocks DOE Completes Sale of Northeast Home Heating Oil Stocks February 10, 2011 - 12:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) today has awarded contracts to four companies who successfully bid for the purchase of 1,000,000 barrels of heating oil from the Northeast Home Heating Oil Reserve storage sites in Groton and New Haven, CT. Hess Groton Terminal, Groton, CT Shell Trading U.S. Company 150,000 barrels Sprague

  10. Test report for core drilling ignitability testing

    SciTech Connect (OSTI)

    Witwer, K.S.

    1996-08-08

    Testing was carried out with the cooperation of Westinghouse Hanford Company and the United States Bureau of Mines at the Pittsburgh Research Center in Pennsylvania under the Memorandum of Agreement 14- 09-0050-3666. Several core drilling equipment items, specifically those which can come in contact with flammable gasses while drilling into some waste tanks, were tested under conditions similar to actual field sampling conditions. Rotary drilling against steel and rock as well as drop testing of several different pieces of equipment in a flammable gas environment were the specific items addressed. The test items completed either caused no ignition of the gas mixture, or, after having hardware changes or drilling parameters modified, produced no ignition in repeat testing.

  11. Single trip completion of spaced formations

    SciTech Connect (OSTI)

    Vann, R.R.; Brieger, E.F.

    1986-09-23

    A method is described of perforating two spaced-apart formations, which consists of: positioning a first perforating gun in a borehole adjacent to a first formation and a second perforating gun in the borehole adjacent to a second formation; detonating the charges of the first gun to create a pressure shock wave, the pressure shock wave being generated by application of the explosive force from firing the first gun to a movable wall closing one end of a column of fluid; directing the pressure shock wave to means for detonating the charges of the second gun; and detonating the charges of the second gun in response to the pressure shock wave. An apparatus is described for completing a well, comprising; first perforating means for perforating one portion of the well; second perforating means for perforating another portion of the well; means for transmitting a fluid pulse upon detonation of the first perforating means; and means for receiving the fluid pulse to actuate the detonation of the second perforating means.

  12. Advanced Hot Section Materials and Coatings Test Rig

    SciTech Connect (OSTI)

    Dan Davis

    2006-09-30

    Phase I of the Hyperbaric Advanced Hot Section Materials & Coating Test Rig Program has been successfully completed. Florida Turbine Technologies has designed and planned the implementation of a laboratory rig capable of simulating the hot gas path conditions of coal gas fired industrial gas turbine engines. Potential uses of this rig include investigations into environmental attack of turbine materials and coatings exposed to syngas, erosion, and thermal-mechanical fatigue. The principle activities during Phase 1 of this project included providing several conceptual designs for the test section, evaluating various syngas-fueled rig combustor concepts, comparing the various test section concepts and then selecting a configuration for detail design. Conceptual definition and requirements of auxiliary systems and facilities were also prepared. Implementation planning also progressed, with schedules prepared and future project milestones defined. The results of these tasks continue to show rig feasibility, both technically and economically.

  13. Sandia Labs and NREL Hosted Successful 2016 PV Reliability Workshop

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Hosted Successful 2016 PV Reliability Workshop - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste

  14. EERE Success Story-New Advanced Refrigeration Technology Provides Clean

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy, Low Utility Bills for Supermarkets | Department of Energy Advanced Refrigeration Technology Provides Clean Energy, Low Utility Bills for Supermarkets EERE Success Story-New Advanced Refrigeration Technology Provides Clean Energy, Low Utility Bills for Supermarkets July 16, 2015 - 2:23pm Addthis Oak Ridge National Laboratory's (ORNL's) Brian Fricke tests Hillphoenix's Advansor Refrigeration System in ORNL's state-of-the-art Building Technologies Research & Integration Center

  15. Continuing the Validation of CCIM Processability for Glass Ceramic HLLW Forms: Plan for Test AFY14CCIM-GC1

    SciTech Connect (OSTI)

    Vince Maio

    2014-04-01

    This test plan covers test AFY14CCIM-GC1which is the first of two scheduled FY-2014 test runs involving glass ceramic waste forms in the Idaho National Laboratory’s Cold Crucible Induction Melter Pilot Plant. The test plan is based on the successes and challenges of previous tests performed in FY-2012 and FY-2013. The purpose of this test is to continue to collect data for validating the glass ceramic High Level Liquid Waste form processability advantages using Cold Crucible Induction Melter technology. The major objective of AFYCCIM-GC1 is to complete additional proposed crucible pouring and post tapping controlled cooling experiments not completed during previous tests due to crucible drain failure. This is necessary to qualify that no heat treatments in standard waste disposal canisters are necessary for the operational scale production of glass ceramic waste forms. Other objectives include the production and post-test analysis of surrogate waste forms made from separate pours into the same graphite mold canister, testing the robustness of an upgraded crucible bottom drain and drain heater assembly, testing the effectiveness of inductive melt initiation using a resistive starter ring with a square wave configuration, and observing the tapped molten flow behavior in pans with areas identical to standard High Level Waste disposal canisters. Testing conditions, the surrogate waste composition, key testing steps, testing parameters, and sampling and analysis requirements are defined.

  16. PAFC History and Successes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    History and Successes PAFC History and Successes Presentation at the MCFC and PAFC R&D Workshop held Nov. 16, 2009, in Palm Springs, CA mcfc_pafc_workshop_ferro.pdf (1.83 MB) More Documents & Publications MCFC and PAFC R&D Workshop Summary Report PAFC Cost Challenges Fuel Cell Development Status

  17. Task completion report for update FXFILL

    SciTech Connect (OSTI)

    Steinke, R.G.

    1997-09-02

    The FILL component in TRAC-P defines a phasic-velocities boundary condition or total-mass-flow boundary condition. FILL option IFTY = 10 defines the total-mass flow and its composition for flow donoring from the FILL to its adjacent component by signal variables and/or control blocks. For flow from the adjacent component to the FILL component, the phasic densities of the adjacent-component cell need to be upstream donored by the IFTY = 10 option total-mass flow. Instead, the FILL-cell phasic densities are being downstream donored incorrectly by the IFTY = 10 option total-mass flow in determining the FILL-junction phasic velocities. Using the wrong donored phasic densities caused the phasic velocities determined from the total-mass flow to be evaluated incorrectly. Five errors related to phasic-density donoring into a FILL- or BREAK-component cell are corrected by update FXFILL. Seven versions of a new test problem test these corrections and show that the errors of trouble reports 189 and 190 no longer exist in TRAC-P.

  18. Completion Report for Well ER-EC-2A

    SciTech Connect (OSTI)

    M. J. Townsend

    2002-03-01

    Well ER-EC-2A was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in January and February of 2000 as part of a hydrogeologic investigation program in the Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 412.9 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,516.1 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static water level was measured at the depth of 228.0 meters, approximately two months after installation of the completion string. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in this report. These are based on composite drill cuttings collected every 3 meters, and 81 sidewall samples taken at various depths below 212 meters, supplemented by geophysical log data. Detailed petrographic, chemical, and mineralogical studies of rock samples were conducted on 30 samples. The well was collared in rhyolite lava and penetrated Tertiary-age lava and tuff of the Volcanics of Fortymile Canyon and the Timber Mountain Group. The preliminary geologic interpretation of borehole data indicates that this well was drilled within the margins of the buried Rainier Mesa and Ammonia Tanks calderas, and that caldera collapse in this area was deeper than expected, resulting in a section of Volcanics of Fortymile Canyon (caldera-filling deposit) that is much thicker than expected.

  19. Completion Report for Well ER-EC-5

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-EC-5 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation program in the Western Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 342.6 meters below ground surface. The borehole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 762.0 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static water level was measured at the depth of 309.9 meters, 40 days after installation of the completion string. Detailed lithologic descriptions with stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters, and 18 sidewall samples taken at various depths below 349.6 meters, supplemented by geophysical log data and results from detailed chemical and mineralogical analyses of rock samples. The well penetrated Tertiary-age tuffs of the Thirsty Canyon Group, caldera moat-filling sedimentary deposits, lava of the Beatty Wash Formation, and landslide breccia and tuffs of the Timber Mountain Group. The well reached total depth in welded ashflow tuff of the Ammonia Tanks Tuff after penetrating 440.1 meters of this unit, which is also the main water-producing unit in the well. The geologic interpretation of data from this well constrains the western margin of the Ammonia Tanks caldera to the west of the well location.

  20. Completion Report for Well ER-EC-1

    SciTech Connect (OSTI)

    Townsend, M.J.

    2000-12-01

    Well ER-EC-1 was drilled for the U.S. Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the spring of 1999 as part of the U.S. Department of Energy's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to the depth 675.1 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,524.0 meters. A preliminary composite, static, water level was measured at the depth of approximately 566.3 meters prior to installation of the completion string. One completion string with three isolated, slotted intervals was installed in the well. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters and 31 sidewall samples taken at various depths below 680 meters, supplemented by geophysical log data. Detailed chemical and mineralogical studies of rock samples are in progress. The well penetrated Tertiary-age lava and tuff of the Timber Mountain Group, the Paintbrush Group, the Calico Hills Formation, the Crater Flat Group, and the Volcanics of Quartz Mountain. The preliminary geologic interpretation of data from Well ER-EC-1 indicates the presence of a structural trough or bench filled with a thick section of post-Rainier Mesa lava. These data also suggest that this site is located on a buried structural ridge that may separate the Silent Canyon and Timber Mountain caldera complexes.

  1. Completion Report for Well ER-EC-4

    SciTech Connect (OSTI)

    M. J. Townsend

    2000-09-01

    Well ER-EC-4 was drilled for the US Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the U.S Department of Energy's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 263.7 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,062.8 meters. One completion string with three isolated slotted intervals was installed in the well. A preliminary composite, static, water level was measured at the depth of 228.3 meters, two months after installation of the completion string. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters, and 35 sidewall samples taken at various depths below 286.5 meters, supplemented by geophysical log data. Detailed chemical and mineralogical studies of rock samples are in progress. The well was collared in basalt and penetrated Tertiary-age lava and tuff of the Thirsty Canyon Group, the Volcanics of Fortymile Canyon, and the Timber Mountain Group. The preliminary geologic interpretation of data from this well helps pinpoint the location of the western margin of the Timber Mountain caldera complex in the southern Nevada volcanic field.

  2. Completion Report for Well ER-EC-7

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    Well ER-EC-7 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the summer of 1999 as part of the Department of Energy's hydrogeologic investigation program in the Western Pahute Mesa - Oasis Valley region just west of the Test Site. A 44.5-centimeter surface hole was drilled and cased off to a depth of 265.8 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 422.5 meters. The planned depth of 762 meters was not reached due to borehole stability problems. One completion string with two isolated slotted intervals was installed in the well. A preliminary composite, static, water level was measured at the depth of 227.8 meters, 20 days after installation of the completion string. Detailed lithologic descriptions with stratigraphic assignments are included in the report. These are based on composite drill cuttings, supplemented by geophysical log data, and incorporating data from detailed chemical and mineralogical studies of rock samples. Beneath a thin alluvial deposit, the well penetrated 410 meters of lava and bedded tuff of the Volcanics of Fortymile Canyon Group, deposited in the Timber Mountain caldera moat after caldera collapse. The geologic interpretation of data from this well provides information on the thickness, lithologic composition, and hydrogeologic character of moat-filling rocks in the southern portion of the Timber Mountain caldera complex in the southwestern Nevada volcanic field.

  3. Completion report for Well ER-EC-6

    SciTech Connect (OSTI)

    M. J. Townsend

    2000-05-01

    Well ER-EC-6 was drilled for the U.S. Department of Energy, Nevada Operations Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This well was drilled in the spring of 1999 as part of the DOE's hydrogeologic investigation well program in the Western Pahute Mesa - Oasis Valley region just west of the Nevada Test Site. A 66-centimeter surface hole was drilled and cased off to the depth of 485.1 meters below the surface. The hole diameter was then decreased to 31.1 centimeters for drilling to a total depth of 1,524.0 meters. A preliminary composite, static, water level was measured at the depth of approximately 434.6 meters prior to installation of the completion string. One completion string with four isolated, slotted intervals was installed in the well. Detailed lithologic descriptions with preliminary stratigraphic assignments are included in the report. These are based on composite drill cuttings collected every 3 meters and 33 sidewall samples taken at various depths below 504.4 meters, supplemented by geophysical log data. Detailed chemical and mineralogical studies of rock samples are in progress. The well penetrated Tertiary-age lava and tuff of the Timber Mountain Group, the Paintbrush Group, the Calico Hills Formation, and the Volcanics of Quartz Mountain. Intense hydrothermal alteration was observed below the depth of 640 m. The preliminary geologic interpretation indicates that this site may be located on a buried structural ridge that separates the Silent Canyon and Timber Mountain caldera complexes.

  4. Project Registration Number Assignments (Completed) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed) Project Registration Number Assignments (Completed) As of: May 2016 Provides a table of Project Registration Number Assignments (Completed) Project Registration Number Assignments (Completed) (406.85 KB) More Documents & Publications All Active DOE Technical Standards Document Project Registration Number Assignments (Active

  5. Major results from safety-related integral effect tests with VISTA-ITL for the SMART design

    SciTech Connect (OSTI)

    Park, H. S.; Min, B. Y.; Shin, Y. C.; Yi, S. J.

    2012-07-01

    A series of integral effect tests (IETs) was performed by the Korea Atomic Energy Research Inst. (KAERI) using the VISTA integral test loop (VISTA-ITL) as a small-scale IET program. Among them this paper presents major results acquired from the safety-related IETs with the VISTA-ITL facility for the SMART design. Three small-break loss-of-coolant accident (SBLOCA) tests of safety injection system (SIS) line break, shutdown cooling system (SCS) line break and pressurizer safety valve (PSV) line break were successfully performed and the transient characteristics of a complete loss of flowrate (CLOF) was simulated properly with the VISTA-ITL facility. (authors)

  6. NNSA Completes Conversion of the Budapest Research Reactor and Removal of

    National Nuclear Security Administration (NNSA)

    All Fresh HEU in Hungary | National Nuclear Security Administration | (NNSA) Completes Conversion of the Budapest Research Reactor and Removal of All Fresh HEU in Hungary September 15, 2009 WASHINGTON, D.C. - This week, the National Nuclear Security Administration (NNSA), in cooperation with KFKI Atomic Energy Research Institute, successfully converted the Budapest Research Reactor (BRR) from the use of highly enriched uranium (HEU) fuel to low enriched uranium (LEU) fuel. The BRR conversion

  7. [Building and testing of Pickard Line-up Boom

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    The Packard Line-up Boom is a device for controlling the placing together of the ends of two sections of pipe for clamping and welding. Consistently better weld quality is possible because the optimum weld space is achieved and held constant throughout every stringer bead, regardless of the welding method. With the use of the Pickard Line-Up Boom, there will be a minimum of pipe movement while the stringer bead is being run. Since the welder can rely on conditions being the same throughout the weld, he can regulate the weld to eliminate backwelding almost entirely. During the grant period and with the assistance of DOE grant funds, Pickard Line-up Boom Associates (PLUBA) successfully completed Task 1, construction of the Packard Boom. PLUBA contracted with Sawyer Manufacturing Company (1031 North Columbia Place, Tulsa, Oklahoma) to construct the new boom. After completion of the new boom by Sawyer, the boom was successfully tested by PLUBA, thereafter PLUBA attempted to obtain lease agreements with pipeline contractors (Tasks 2 and 3). Toward the end of the project period, PLUBA entered into a license/marketing agreement with Sabre International with. the objective of first securing contracts outside of the United States. Once this is achieved and the Packard Boom is used successfully in the field, it is believed that pipeline contractors may be more willing to use the Packard Boom in the United States.

  8. 309 Facility deactivation and decommisioning Criteria Completion Check Lists

    SciTech Connect (OSTI)

    Cornwell, B.C.

    1996-02-01

    To facilitate and track completion of the 309 Facility turnover criteria completion an Applicability Matrix and Criteria Completion Check Lists were prepared. The applicability matrix documents the required turnover criteria for a given area in the facility or scope of work. The applicable criteria is selected for 16 different areas. For each area a completion checklist is provided to document completion of a requirement by WHC and the Environmental Restoration Contractor.

  9. Tracers and Tracer Testing: Design, Implementation, Tracer Selection...

    Office of Scientific and Technical Information (OSTI)

    Conducting a successful tracer test requires adhering to a set of steps. The steps include identifying appropriate and achievable test goals, identifying tracers with the ...

  10. Sandia Energy - Molten Nitrate Salt Initial Flow Testing is a...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nitrate Salt Initial Flow Testing is a Tremendous Success Home Renewable Energy News Concentrating Solar Power Solar Molten Nitrate Salt Initial Flow Testing is a Tremendous...

  11. TEST DEVICE FOR MEASURING PERMEABILITY OF A BARRIER MATERIAL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Partners (27) Visual Patent Search Success Stories Return to Search TEST DEVICE FOR ... Transfer Website Abstract: A test device for measuring permeability of a barrier material. ...

  12. July 16, 1945: Trinity Test | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6, 1945: Trinity Test July 16, 1945: Trinity Test July 16, 1945: Trinity Test July 16, 1945 Los Alamos scientists successfully test a plutonium implosion bomb in the Trinity shot at Alamogordo, New Mexico

  13. Philippine refiner completes diesel desulfurization project

    SciTech Connect (OSTI)

    Candido, S.S.; Crisostomo, E.V.

    1997-01-27

    In anticipation of tightening sulfur specifications on diesel fuel, Petron Corp. built a new 18,000 b/sd gas oil desulfurization unit (GODU) at its refinery in Bataan, Philippines. The GODU gives Petron sufficient diesel oil desulfurization capacity to meet demand for lower-sulfur diesel in the country. The project places the refinery in a pacesetter position to comply with the Philippine government`s moves to reduce air pollution, especially in urban centers, by reducing the sulfur specification for diesel to 0.5 wt% in 1996 from 0.7 wt% at the start of the project. Performance tests and initial operations of the unit have revealed a desulfurization efficiency of 91% vs. a guaranteed efficiency of 90%. A feed sulfur content of 1.33 wt% is reduced to 0.12 wt% at normal operating conditions. Operating difficulties during start-up were minimized through use of a detailed prestartup check conducted during the early stages of construction work.

  14. TMACS Test Procedure TP007: System administration

    SciTech Connect (OSTI)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  15. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  16. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  17. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  18. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  19. ISDSN Sensor System Phase One Test Report

    SciTech Connect (OSTI)

    Gail Heath

    2011-09-01

    This Phase 1 Test Report documents the test activities and results completed for the Idaho National Laboratory (INL) sensor systems that will be deployed in the meso-scale test bed (MSTB) at Florida International University (FIU), as outlined in the ISDSN-MSTB Test Plan. This report captures the sensor system configuration tested; test parameters, testing procedure, any noted changes from the implementation plan, acquired test data sets, and processed results.

  20. EGS Success Stories | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    February 20, 2008 DOE and Partners Test Enhanced Geothermal Systems Technologies DOE has embarked on a project with a number of partners to test Enhanced Geothermal Systems (EGS)...

  1. NNSA, Air Force Conduct Successful W87/Minuteman III Joint Flight...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA, Air Force Conduct Successful W87Minuteman III Joint Flight Test March 01, 2012 WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) and the U.S. Air Force ...

  2. EERE Success Story—Catching a Wave: Innovative Wave Energy Device Surfs for Power in Hawaii

    Broader source: Energy.gov [DOE]

    With support from the Energy Department and the U.S. Navy, a prototype wave energy device has advanced successfully from initial concept to grid-connected, open-ocean pilot testing. The device,...

  3. Vertical borehole design and completion practices used to remove methane gas from mineable coalbeds

    SciTech Connect (OSTI)

    Lambert, S.W.; Trevits, M.A.; Steidl, P.F.

    1980-08-01

    Coalbed gas drainage from the surface in advance of mining has long been the goal of researchers in mine safety. Bureau of Mines efforts to achieve this goal started about 1965 with the initiation of an applied research program designed to test drilling, completion, and production techniques for vertical boreholes. Under this program, over 100 boreholes were completed in 16 different coalbeds. The field methods derived from these tests, together with a basic understanding of the coalbed reservoir, represent an available technology applicable to any gas drainage program whether designed primarily for mine safety or for gas recovery, or both.

  4. Energy Savings Performance Contract Success Stories

    SciTech Connect (OSTI)

    2009-07-27

    Three case study success stories showcasing energy savings performance contract projects at Dyess Air Force Base, Food and Drug Administration White Oaks Campus, and the Harold Washington Social Security Administration Center.

  5. National Laboratory Impact Initiative: Success Stories | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... May 7, 2015 EERE Success Story-Fundamental Studies in Catalysis Enabled the use of Efficient "Lean-Burn" Engines for Vehicle Transportation Building on a catalysis research program ...

  6. Biofuels in Minnesota: A Success Story

    Broader source: Energy.gov [DOE]

    This PDF provides a Minnesota biofuels success story. It shows the timeline of state actions, the number of biodiesel plants in the state, production and consumption rates, and the NextGen Energy Initiative.

  7. Success Stories (Postcard), Wind Powering America (WPA)

    SciTech Connect (OSTI)

    Not Available

    2012-02-01

    Wind Powering America shares best practices and lessons learned on the Wind Powering America website. This postcard is an outreach tool that provides a brief description of the success stories as well as the URL.

  8. Highlights from NNSA's Decade of Success

    ScienceCinema (OSTI)

    None

    2010-09-01

    On April 28, 2010, the National Nuclear Security Administration celebrated its 10-year anniversary with a series of events aimed at highlighting a decade of success across the nuclear security enterprise. This slideshow features images from the past 10 years.

  9. ESPC Success Story - Dyess Air Force Base

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DYESS AIR FORCE BASE DYESS, TEXAS Water Conservation and Green Energy ESPC SUCCESS STORY Dyess Air Force Base and surrounding west Texas has been under extreme-drought water ...

  10. NREL: Technology Deployment - Project Success Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Success Stories NREL's technology deployment best practices, project support, and technical assistance, and technology acceleration activities are resulting in successful renewable energy and energy efficiency implementation in numerous locations. A photo of a brown camouflage shirt with the words U.S. Marines on the pocket. Photo by: Cpl. Raquel Barraza Microgrid Innovation Advances through Demonstration and Deployment at MCAS Miramar A screenshot of a yellow and orange graph from the

  11. Uranium Weapons Components Successfully Dismantled | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Uranium Weapons Components Successfully Dismantled Uranium Weapons Components Successfully Dismantled Oak Ridge, TN Continuing its efforts to reduce the size of the U.S. nuclear weapons stockpile, the National Nuclear Security Administration announced that uranium components from two major nuclear weapons systems formerly deployed on U.S. Air Force missiles and aircraft have been dismantled at the Y-12 National Security Complex in Oak Ridge, TN. Y-12 workers

  12. Accomplishments and Successes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the Bioenergy Technologies Office » Accomplishments and Successes Accomplishments and Successes The Bioenergy Technologies Office (BETO) forms cost-share public-private partnerships to help sustainably develop cost-competitive biofuels and bioproducts in the United States from non-food biomass resources. The potential exists to sustainably produce at least one billion dry tons of non-food biomass resources by 2030-a sufficient quantity to displace approximately 30% of the present U.S.

  13. EGS Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EGS Success Stories EGS Success Stories May 26, 2016 The team at Brady Hot Springs includes scientists and engineers from: University of Wisconsin-Madison Department of Geoscience; Ormat Technologies, Inc.; Silixa Ltd.; University of Nevada-Reno; Temple University; Lawrence Livermore National Laboratory; and Lawrence Berkeley National Laboratory. | Photo by Dan Koetke Nevada Site Home to Geothermal Community Focused on Expediting Research and Development Over the last six years, Brady Hot

  14. 2013 Accomplishments and Successes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2013 Accomplishments and Successes 2013 Accomplishments and Successes Reshaping American Energy-A Look Back At BETO's Accomplishments In 2013 Fact Sheet The U.S. bioindustry provides a secure and growing supply of transportation fuels, biopower, and bioproducts from a variety of biomass resources. Biomass is the only renewable energy source that can offer a viable substitute for petroleum-based liquid transportation fuels in the near term. It can also provide valuable chemicals for manufacturing

  15. Browse Success Stories - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories » All Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Graphic of a full-grown tree with many leaves. Browse Success Stories

  16. Energy Department Small Business Partner Success Stories | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Energy Department Small Business Partner Success Stories Energy Department Small Business Partner Success Stories Energy Department Small Business Partner Success Stories

  17. State Energy Program Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Energy Program State Energy Program Success Stories State Energy Program Success Stories RSS Read State Energy Program success stories. December 21, 2011 This is part of...

  18. National SCADA Test Bed | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Created in 2003, the National SCADA Test Bed (NSTB) is a one-of-a-kind national resource ... In December 2012, the lab successfully demonstrated QKD on the University of Illinois test ...

  19. NMSLO Affidavit of Completion of ROW Construction | Open Energy...

    Open Energy Info (EERE)

    NMSLO Affidavit of Completion of ROW Construction Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Affidavit of Completion of...

  20. EM's Los Alamos TRU Waste Campaign Heads Toward Completion |...

    Office of Environmental Management (EM)

    TRU Waste Campaign Heads Toward Completion EM's Los Alamos TRU Waste Campaign Heads Toward Completion November 20, 2013 - 12:00pm Addthis Advanced techniques allowed crews at Los ...

  1. Completing Salt Waste Processing Facility is an EM Priority and...

    Office of Environmental Management (EM)

    Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup Progress Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup ...

  2. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....

  3. Decant pump assembly and controls qualification testing - test report

    SciTech Connect (OSTI)

    Staehr, T.W., Westinghouse Hanford

    1996-05-02

    This report summarizes the results of the qualification testing of the supernate decant pump and controls system to be used for in-tank sludge washing in aging waste tank AZ-101. The test was successful and all components are qualified for installation and use in the tank.

  4. CompleteProject List.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CompleteProject List.doc&#0; CompleteProject List.doc&#0; CompleteProject List.doc&#0; (9.47 KB) More Documents & Publications Tribal Energy Program February 2012 Award Project Descriptions CX-008525: Categorical Exclusion Determination 2010 Program Review Meeting

  5. NNSA Completes B61 Warhead Refurbishment | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Completes B61 Warhead Refurbishment NNSA Completes B61 Warhead Refurbishment Washington, DC NNSA completed a six-year effort to deliver the first refurbished B61 nuclear bomb. This program will extend the life of the B61 Mod-7 and Mod-11 strategic bombs in the U.S. nuclear weapons stockpile

  6. Apparatus for the concurrent inspection of partially completed welds

    DOE Patents [OSTI]

    Smartt, Herschel B.; Johnson, John A.; Larsen, Eric D.; Bitsoi, Rodney J.; Perrenoud, Ben C.; Miller, Karen S.; Pace, David P.

    2002-01-01

    An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

  7. Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

    SciTech Connect (OSTI)

    Malkewicz, Nicholas; Kirksey, Jim; Finley, Robert

    2015-05-01

    Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and

  8. Energy Efficiency and Conservation Block Grant Program Success Stories

    Broader source: Energy.gov [DOE]

    Energy Efficiency and Conservation Block Grant (EECBG) Program's success stories including news articles, EERE Successes and EERE Blog entries.

  9. Advanced Technology Vehicle Testing

    SciTech Connect (OSTI)

    James Francfort

    2003-11-01

    The light-duty vehicle transportation sector in the United States depends heavily on imported petroleum as a transportation fuel. The Department of Energy’s Advanced Vehicle Testing Activity (AVTA) is testing advanced technology vehicles to help reduce this dependency, which would contribute to the economic stability and homeland security of the United States. These advanced technology test vehicles include internal combustion engine vehicles operating on 100% hydrogen (H2) and H2CNG (compressed natural gas) blended fuels, hybrid electric vehicles, neighborhood electric vehicles, urban electric vehicles, and electric ground support vehicles. The AVTA tests and evaluates these vehicles with closed track and dynamometer testing methods (baseline performance testing) and accelerated reliability testing methods (accumulating lifecycle vehicle miles and operational knowledge within 1 to 1.5 years), and in normal fleet environments. The Arizona Public Service Alternative Fuel Pilot Plant and H2-fueled vehicles are demonstrating the feasibility of using H2 as a transportation fuel. Hybrid, neighborhood, and urban electric test vehicles are demonstrating successful applications of electric drive vehicles in various fleet missions. The AVTA is also developing electric ground support equipment (GSE) test procedures, and GSE testing will start during the fall of 2003. All of these activities are intended to support U.S. energy independence. The Idaho National Engineering and Environmental Laboratory manages these activities for the AVTA.

  10. Forklift Test

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Forklift Safety Test Instructions: All Training and Testing Material is for LSU CAMD Users ... A minimum passing score is 80% (8 out of 10) This test can only be taken once in a thirty ...

  11. Meeting pollution prevention goals: Successful implementation

    SciTech Connect (OSTI)

    Seith, B.J. )

    1993-01-01

    This paper focuses on the essential, but often overlooked, elements of a pollution prevention program: the steps required for a successful implementation. As programs are being developed, attention must be given to assuring that the systems to support a successful introduction and continued improvement are in place. The goals of a pollution prevention plan (i.e. 50% reduction in toxics use and 40% reduction in hazardous waste generation within three years) must be translated into performance oriented-responsibilities taken throughout an organization, at all levels. Successful implementation requires a genuine commitment from management, employee awareness programs tailored to each type of audience, and a feedback system to assure that the program is continually changing to incorporate new pollution prevention challenges. Also, by conducting an economic analysis of pollution prevention opportunities and activities, and incorporating the results into the business decision-making process, a company is more apt to make wise and measurable performance towards its pollution prevention goals.

  12. POC-scale testing of a dry triboelectrostatic separator for fine coal cleaning

    SciTech Connect (OSTI)

    R.-H. Yoon; G.H. Luttrell; G.T. Adel; A.D. Walters

    1999-07-01

    The Proof-of-Concept (POC) triboelectrostatic separator (TES) has now been successfully installed at the Virginia Tech pilot-plant. As a result, most of the personnel assigned to this project during the past quarter have been performing work elements associated with the installation and shakedown testing of the electrostatic separator, tribocharger system, product conveying systems and nitrogen purge system (Tasks 4, 5.1 and 5.2). A representative from Carpco also carried out training in the operating features of the unit during the past month. Most of the shakedown test work has now been successfully completed. However, several minor operational problems associated with the pilot-scale equipment are currently in the process of being resolved.

  13. Lustre Tests

    Energy Science and Technology Software Center (OSTI)

    2007-08-31

    Lustre-tests is a package of regression tests for the Lustre file system containing I/O workloads representative of problems discovered on production systems.

  14. Collaboration Shines in Materials Project Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Collaboration Shines in Materials Project Success Collaboration Shines in Materials Project Success Many Hands at Lab Lift 'World-Changing Idea' to New Heights December 12, 2013 Margie Wylie, mwylie@lbl.gov, +1 510.486.7421 cover2013-12.jpg Scientific American featured a Computing Sciences-powered project on its December cover as a top world-changing idea of 2013. The Materials Project, an open, web-hosted service, allows scientists using supercomputers and quantum mechanical equations to design

  15. Successful Waste Treatment Methods at Sandia National Laboratories

    SciTech Connect (OSTI)

    Rast, D.M.; Thompson, J.J.; Cooper, T.W.; Stockham, D.J

    2007-07-01

    During the remediation of the waste landfills at Sandia National Laboratory in Albuquerque, New Mexico nine drums of mock high explosives were generated. This mixed waste stream was proposed to several offsite vendors for treatment and prices ranged from $2.50 to $10 per gram a total cost estimated to be in excess of $2 million dollars. This cost represents more than 30 percent of the annual budget for the Sandia Waste Management Operations. Concentrated solutions of common oxidizers, such as nitrates, nitrites, and peroxides, will also act as oxidizers and will give positive results in the Hazard Categorization oxidizer test. These solutions carry an EPA Hazardous Waste Number D001, Ignitable Waste, and Oxidizer as defined in 49 CFR 173.151. Sandia decided that given budget and time constraints to meet a Federal Facilities Compliance Act milestone, a process for onsite treatment should be evaluated. Clean samples of mock high explosive materials were obtained from Pantex excess inventory and treatability studies initiated to develop a treatment formula and process. The following process was developed and implemented in the summer of 2006: - Size reduction to allow for dissolution of the barium nitrate in water; - Dissolution of the Mock HE in water; - Deactivation of the oxidizer; - Stabilization of the barium and the cadmium contamination present as an underlying hazardous constituent. This project was completed and the treatment milestone achieved for less than $300,000. The Disassembly Sanitization Operation (DSO) is a process that was implemented to support weapon disassembly and disposition using recycling and waste minimization while achieving the demilitarization mission. The Department of Energy is faced with disassembling and disposition of a huge inventory of retired weapons, components, training equipment, spare parts, and weapon maintenance equipment. Environmental regulations have caused a dramatic increase for information needed to support the

  16. EERE Success Story-Wind Vision: Continuing the Success of Wind Energy |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Wind Vision: Continuing the Success of Wind Energy EERE Success Story-Wind Vision: Continuing the Success of Wind Energy April 2, 2015 - 10:35am Addthis The Wind Vision Report describes potential wind industry scenarios for 2020, 2030, and 2050. The Wind Vision Report describes potential wind industry scenarios for 2020, 2030, and 2050. The Energy Department recently released the highly anticipated Wind Vision Report that quantifies the economic, environmental, and

  17. COMPLETION REPORT FOR WELL CLUSTER ER-5-3

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-12-01

    Well Cluster ER-5-3 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Restoration Project at the Nevada Test Site, Nye County, Nevada. This cluster of 3 wells was drilled in 2000 and 2001 as part of a hydrogeologic investigation program in Frenchman Flat. The first borehole in the cluster, Well ER-5-3, was drilled in February and March 2000. A 47.0-centimeter surface hole was drilled and cased off to the depth of 374.8 meters. The hole diameter was decreased to 31.1 centimeters for drilling to a total depth of 794.3 meters within welded ash-flow tuff. A piezometer string with 1 slotted interval was installed in the annulus of the surface casing, open to the saturated alluvium. A completion string with 2 slotted intervals was installed in the main hole, open to saturated alluvium and to the welded tuff aquifer. A second piezometer string with 1 slotted interval open to the welded-tuff aquifer was installed outside the completion string. Well ER-5-3 No.2 was drilled about 30 meters west of the first borehole in March 2000, and was recompleted in March 2001. A 66.0-centimeter hole was drilled and cased off to the depth of 613.8 meters. The hole diameter was decreased to 44.5 centimeters and the borehole was drilled and cased off to the depth of 849.0 meters. The hole diameter was decreased once more to 31.1 centimeters for drilling to a total depth of 1,732.2 meters in dolomite. A completion string open to the dolomite (lower carbonate aquifer) was installed. Well ER-5-3 No.3 was drilled approximately 30 meters north of the first 2 boreholes in February 2001. A 66.0-centimeter hole was drilled and cased off to the depth of 36.6 meters, then the main 25.1-centimeter-diameter hole was drilled to a total depth of 548.6 meters in alluvium. A slotted stainless-steel tubing string was installed in the saturated alluvium. A preliminary composite, static water level was measured at

  18. EERE Success Story—Washington, D.C. and Indiana: Allison Hybrid Technology Achieves Commercial Success

    Broader source: Energy.gov [DOE]

    EERE partner, Allison Transmission, Inc., has achieved commercial success in the greater Washington, D.C. area, with 1,480 hybrid buses on the road.

  19. Entry/Exit Port testing, test report

    SciTech Connect (OSTI)

    Winkelman, R.H.

    1993-05-01

    The Waste Receiving and Processing Module I (WRAP-1) facility must have the ability to allow 55-gallon drums to enter and exit glovebox enclosures. An Entry/Exit Port (Appendix 1, Figure 1), designed by United Engineers and Constructors (UE&C), is one method chosen for drum transfer. The Entry/Exit Port is to be used for entry of 55-gallon drums into both process entry gloveboxes, exit of 55-gallon drum waste pucks from the low-level waste (LLW) glovebox, and loadout of waste from the restricted waste management glovebox. The Entry/Exit Port relies on capture velocity air flow and a neoprene seal to provide alpha confinement when the Port is in the open and closed positions, respectively. Since the glovebox is in a slight vacuum, air flow is directed into the glovebox through the space between the overpack drum and glovebox floor. The air flow is to direct any airborne contamination into the glovebox. A neoprene seal is used to seal the Port door to the glovebox floor, thus maintaining confinement in the closed position. Entry/Exit Port testing took place February 17, 1993, through April 14, 1993, in the 305 building of Westinghouse Hanford Company. Testing was performed in accordance with the Entry/Exit Port Testing Test Plan, document number WHC-SD-WO26-TP-005. A prototype Entry/Exit Port built at the Hanford Site was tested using fluorescent paint pigment and smoke candles as simulant contaminants. This test report is an interim test report. Further developmental testing is required to test modifications made to the Port as the original design of the Port did not provide complete confinement during all stages of operation.

  20. Innovation and Success in Solar Financing

    Office of Energy Efficiency and Renewable Energy (EERE)

    This webinar, "Innovation and Success in Solar Financing," was originally presented on July 10, 2013 as part of the DOE SunShot Initiative's Solar Action Webinar Series. After a brief presentation about the SunShot Initiative's overarching goals, three solar coordinators discuss their strategies for solving the financial challenges associated with their state- and local-level solar energy projects.

  1. Navy's Section 2922a Legislation Success Stories

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—features U.S. Department of Navy success stories in relation to Section 2922a legislation, which involves contracts for energy or fuel for military installations.

  2. Restoration and testing of an HTS fault current controller

    SciTech Connect (OSTI)

    Waynert, J. A.; Boenig, H.; Mielke, C. H.; Willis, J. O.; Burley, B. L.

    2002-01-01

    A three-phase, 1200 A, 12.5 kV fault current controller using three HTS 4 mH coils, was built by industry and tested in 1999 at the Center Substation of Southern California Edison in Norwalk, CA. During the testing, it appeared that each of the three single-phase units had experienced a voltage breakdown, one externally and two internally. Los Alamos National Laboratory (LANL) was asked by DOE to restore the operation of the fault current controller provided the HTS coils had not been damaged during the initial substation tests. When the internally-failed coil vacuum vessels were opened it became evident that in these two vessels, a flashover had occurred at the high voltage bus section leading to the terminals of the superconducting coil. An investigation into the failure mechanism resulted in six possible causes for the flashover. Based on these causes, the high voltage bus was completely redesigned. Single-phase tests were successfully performed on the modified unit at a 13.7 kV LANL substation. This paper presents the postulated voltage flashover failure mechanisms, the new high voltage bus design which mitigates the failure mechanisms, the sequence of tests used to validate the new design, and finally, the results of variable load and short-circuit tests with the single-phase unit operating on the LANL 13.7 kV substation.

  3. Thermal depolymerization of plastics - PDU testing. Task 15. Topical report

    SciTech Connect (OSTI)

    1996-01-01

    The process development unit (PDU) test program is part of an ongoing effort at the Energy & Environmental Research Center (EERC) to expand the base of knowledge for the thermal depolymerization of plastics process. This phase of the development effort, initiated after successful completion of a bench-scale program, has concentrated on maximizing liquid yield. The purposes of the PDU program were (1) to demonstrate the process on a commercially scalable unit, (2) to produce quantities of product that could be used to initiate discussions with potential end users, and (3) to gather engineering and yield data. Experimentation consisted of eleven test points on the PDU and seven on the continuous fluid-bed reactor (CFBR) bench-scale unit. Initial PDU tests (PO35-PO39) were carried out using a base blend, which consists of 60% high-density polyethylene (HDPE), 20% polypropylene (PP), and 20% polystyrene (PS) virgin resin pellets. Test PO39 used base blend with 5% polyvinyl chloride (PVC). The base blend decomposed to produce a flowable liquid, with liquid yields ranging from 33% to 45%. The next series of tests, PO40-PO44, used a postconsumer plastics feed. This material did not decompose as readily as the base blend and formed a very waxy, heavy liquid, with {open_quotes}liquid{close_quotes} yields ranging from 18% to 63% (low liquid yields are the result of using excess air in the natural gas burner in some tests in an attempt to increase gas residence time).

  4. Pulse Jet Mixing Tests With Noncohesive Solids

    SciTech Connect (OSTI)

    Meyer, Perry A.; Bamberger, Judith A.; Enderlin, Carl W.; Fort, James A.; Wells, Beric E.; Sundaram, S. K.; Scott, Paul A.; Minette, Michael J.; Smith, Gary L.; Burns, Carolyn A.; Greenwood, Margaret S.; Morgen, Gerald P.; Baer, Ellen BK; Snyder, Sandra F.; White, Michael K.; Piepel, Gregory F.; Amidan, Brett G.; Heredia-Langner, Alejandro

    2012-02-17

    This report summarizes results from pulse jet mixing (PJM) tests with noncohesive solids in Newtonian liquid. The tests were conducted during FY 2007 and 2008 to support the design of mixing systems for the Hanford Waste Treatment and Immobilization Plant (WTP). Tests were conducted at three geometric scales using noncohesive simulants, and the test data were used to develop models predicting two measures of mixing performance for full-scale WTP vessels. The models predict the cloud height (the height to which solids will be lifted by the PJM action) and the critical suspension velocity (the minimum velocity needed to ensure all solids are suspended off the floor, though not fully mixed). From the cloud height, the concentration of solids at the pump inlet can be estimated. The predicted critical suspension velocity for lifting all solids is not precisely the same as the mixing requirement for 'disturbing' a sufficient volume of solids, but the values will be similar and closely related. These predictive models were successfully benchmarked against larger scale tests and compared well with results from computational fluid dynamics simulations. The application of the models to assess mixing in WTP vessels is illustrated in examples for 13 distinct designs and selected operational conditions. The values selected for these examples are not final; thus, the estimates of performance should not be interpreted as final conclusions of design adequacy or inadequacy. However, this work does reveal that several vessels may require adjustments to design, operating features, or waste feed properties to ensure confidence in operation. The models described in this report will prove to be valuable engineering tools to evaluate options as designs are finalized for the WTP. Revision 1 refines data sets used for model development and summarizes models developed since the completion of Revision 0.

  5. The Integrated Airport: Building a Successful NextGen Testbed

    ScienceCinema (OSTI)

    Frederick-Recascino, Christina [Embry-Riddle Aeronautical University, Daytona Beach, Florida, United States]; Sweigard, Doug [Lockheed Martin Corporation]; Lester, Wade [ERAU

    2010-01-08

    This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment.  NextGen refers to the program that will be initiated to modernize the US National Airspace.  As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success.  This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation. 

  6. Habitat Projects Completed within the Asotin Creek Watershed, 1998 Completion Report.

    SciTech Connect (OSTI)

    Johnson, Bradley J.

    1999-11-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred forty-six projects have been implemented through the ACMWP as of 1998. Fifty-nine of these projects were funded in part through Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; one hundred thirty-nine pools were created with these structures. Three miles of stream benefited from riparian improvements such as fencing, vegetative plantings, and noxious weed control. Two alternative water developments were completed, providing off-stream-watering sources for livestock. 20,500 ft of upland terrace construction, seven sediment basin construction, one hundred eighty-seven acres of grass seeding, eight hundred fifty acres of direct seeding and eighteen sediment basin cleanouts were implemented to reduce sediment production and delivery to streams in the watershed.

  7. Method for the concurrent ultrasonic inspection of partially completed welds

    DOE Patents [OSTI]

    Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Miller, Karen S. (Idaho Falls, ID); Smartt, Herschel B. (Idaho Falls, ID); McJunkin, Timothy R. (Idaho Falls, ID)

    2002-01-01

    A method for the concurrent ultrasonic inspection of partially completed welds is disclosed and which includes providing a pair of transducers which are individually positioned on the opposite sides of a partially completed weld to be inspected; moving the transducers along the length of and laterally inwardly and outwardly relative to the partially completed weld; pulsing the respective transducers to produce an ultrasonic signal which passes through or is reflected from the partially completed weld; receiving from the respective transducers ultrasonic signals which pass through or are reflected from the partially completed welds; and analyzing the ultrasonic signal which has passed through or is reflected from the partially completed weld to determine the presence of any weld defects.

  8. Security Upgrades Completed at Three Russian Nuclear Facilities | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Security Upgrades Completed at Three Russian Nuclear Facilities December 10, 2004 NNSA continues work to keep nuclear material out of the hands of terrorists RUSSIA -- The National Nuclear Security Administration (NNSA) commemorated ten years of work securing nuclear and radiological material in Russia and the former Soviet Union by completing security upgrades at two Russian nuclear facilities this week. Upgrades at a third facility were completed in

  9. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated August 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Completed Projects Print Text

  10. completed_env_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Solutions Completed Projects All Completed Enviromental Solutions Projects Are Listed Below by Category Produced Water | Federal Lands Access | Regulatory Streamlining | Oil Refining Completed Produced Water Management Projects Project Number Project Name Primary Performer DE-NT0005227 Membrane Technology for Produced Water at Lea County, NM Lea County Government, Lovington, NM DE-FE0000833 An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management

  11. Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Production Sites in Ohio | Department of Energy Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio January 19, 2007 - 9:59am Addthis Over 1,100 Acres in Fernald, Columbus and Ashtabula Restored CROSBY TOWNSHIP, OH - U.S. Secretary of Energy Samuel W. Bodman today certified that environmental cleanup is complete at three former weapons

  12. Secretary Chu Announces Completion of Critical Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Standards | Department of Energy Completion of Critical Energy Conservation Appliance Standards Secretary Chu Announces Completion of Critical Energy Conservation Appliance Standards September 1, 2009 - 12:00am Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today that the Department of Energy has completed energy efficiency standards for a critical group of appliances that will together save up to 1.1 billion metric tons of carbon dioxide once in effect. In

  13. Energy Department Completes Cool Roof Installation on DC Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building to Save Money by Saving Energy | Department of Energy Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding

  14. Brief: Multizone subsea completions in the Dai Hung field, Vietnam

    SciTech Connect (OSTI)

    Lay, K.R.

    1996-04-01

    The early production phase of the Dai Hung field development involved drilling and completion of five subsea wells. Owing to the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. Downhole completion designs used equipment that was primarily of existing proven design, and downhole equipment was installed in a single trip. Ongoing reservoir management will be aided by use of a subsea wireline system to facilitate data acquisition.

  15. Hampton University Scientists Complete Historic Experiment | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists Complete Historic Experiment Hampton University Scientists Complete Historic Experiment Two experiments recently completed at the Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility (Jefferson Lab) will put scientists one step closer toward understanding the world we live in. The experiments used Jefferson Lab's high energy accelerator and experimental equipment to produce kaons [pronounced Ka- onz], subatomic particles made of quarks, that have puzzled

  16. World's Most Sensitive Dark Matter Detector Completes Search

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    World's Most Sensitive Dark Matter Detector Completes Search World's Most Sensitive Dark Matter Detector Completes Search July 21, 2016 Dan Krotz, dakrotz@lbl.gov, +1 510.486.4019 LUX A view of the LUX detector during installation. Image: Matthew Kapust/Sanford Underground Research Facility The Large Underground Xenon (LUX) dark matter experiment, which operates beneath a mile of rock at the Sanford Underground Research Facility in the Black Hills of South Dakota, has completed its search for

  17. High power laser workover and completion tools and systems

    DOE Patents [OSTI]

    Zediker, Mark S; Rinzler, Charles C; Faircloth, Brian O; Koblick, Yeshaya; Moxley, Joel F

    2014-10-28

    Workover and completion systems, devices and methods for utilizing 10 kW or more laser energy transmitted deep into the earth with the suppression of associated nonlinear phenomena. Systems and devices for the laser workover and completion of a borehole in the earth. These systems and devices can deliver high power laser energy down a deep borehole, while maintaining the high power to perform laser workover and completion operations in such boreholes deep within the earth.

  18. Princeton Plasma Physics Laboratory achieves milestone, completing first

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    part of heart of fusion experiment | Princeton Plasma Physics Lab Princeton Plasma Physics Laboratory achieves milestone, completing first part of heart of fusion experiment By John Greenwald March 22, 2013 Tweet Widget Google Plus One Share on Facebook The completed first section of the NSTX-U center stack. (Photo by Elle Starkman, PPPL Office of Communications) The completed first section of the NSTX-U center stack. Gallery: Related Images: Engineers and technicians at the U.S. Department

  19. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in North America. Complete LNG Terminal Status Map as of December 2012 (997.96 KB) More Documents & Publications Summary of LNG Export Applications of the Lower 48 States EA-1942: Finding of No Significant Impact ORDER NO. 3413: Jordan Cove LNG

  20. Going completely renewable: is it possible (let alone desirable)?

    SciTech Connect (OSTI)

    Sovacool, Benjamin K.; Watts, Charmaine

    2009-05-15

    With the right mix of leadership and policy, a completely renewable electricity sector for New Zealand and the United States is feasible, achievable, and desirable. (author)

  1. Sandia Energy - SPIDERS Completed Its Phase 1 Operational Demonstratio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grid Integration News & Events Research & Capabilities SMART Grid Energy Assurance Microgrid SPIDERS Completed Its Phase 1 Operational Demonstration in Late January Previous...

  2. Major Milestone: PPPL completes first quadrant of the heart of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    preparations and close teamwork. (Photo by Elle Starkman, PPPL Office of Communications) Mission accomplished: The completed first section of the NSTX-U center stack capped months...

  3. Oak Ridge Environmental Management Program Completes Work at...

    Broader source: Energy.gov (indexed) [DOE]

    program recently completed upgrades and soil remediation work at the Bethel Valley ... and 3. This included removing contaminated soil ("hot spots"), diverting clean groundwater ...

  4. Certification of Completion of Level-2 Milestone 405: Deploy...

    Office of Scientific and Technical Information (OSTI)

    Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment ...

  5. Microsoft Word - Completion of an Evalution of Impact of Loss...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Completion of an Evaluation of the Impact of the Loss of Two Hydrogen and Methane Monitoring Sampling Lines Dear Mr. Bearzi: As required under Permit Condition...

  6. JOBAID-COMPLETING AN EXTERNAL TRAINING REQUEST (SF-182)

    Broader source: Energy.gov [DOE]

    The purpsoe of this job aid is to guide users through the step-by-step process of completing an external training request form (SF-182).

  7. Completed Projects Table 2015-08-21.xlsx

    Office of Environmental Management (EM)

    Completed Projects 2005-Present Approved Actual Soil and Water Remediation Soil and Water Remediation ANLE-0030 a 28 30 2007 2007 Yes Yes Yes Nuclear Facility Deactivation and...

  8. Coiled tubing completions: An economic discussion of procedures

    SciTech Connect (OSTI)

    Courville, P.W.; Clark, T.R.

    1995-11-01

    The introduction of 2- to 3 {1/2}-in. coiled tubing (CT) sizes provides economical alternative completion opportunities for both new and existing wells. Smaller diameters of CT can also be incorporated into completion designs on existing tubular completions for rigless workovers. This paper will discuss the evaluation method for CT completions in relatively low bottom-hole pressure wells in a non-hostile environment. It will concentrate on two major methods of artificial lift: (1) the use of electric submersible pumps (ESPs) on new wells or (2) the use of gas lift methods to extend the production life of existing wells.

  9. NNSA Applauds Y-12 for Completing Potable Water Project Ahead...

    National Nuclear Security Administration (NNSA)

    Applauds Y-12 for Completing Potable Water Project Ahead of Schedule and Under Budget September 11, 2010 Microsoft Office document icon R-9-10.doc

  10. Certification of Completion of Level-2 Milestone 405: Deploy...

    Office of Scientific and Technical Information (OSTI)

    Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and ...

  11. Raft River Geothermal Exploratory Hole No. 1 (RRGE-1). Completion...

    Open Energy Info (EERE)

    report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Raft River Geothermal Exploratory Hole No. 1 (RRGE-1). Completion report Abstract GEOTHERMAL...

  12. completed-ng-projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completed Natural Gas and Unconventional Resources Projects Project Number Project Name Primary Performer 09122-32 A Geomechanical Model for Gas Shales Based on the Integration of ...

  13. Project Completion/Closeout Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6A, Project CompletionCloseout Guide by Brian Huizenga Functional areas: Program Management, Program Planning and Management, Project Management The guide provides nonmandatory...

  14. Modal test optimization using VETO (Virtual Environment for Test Optimization)

    SciTech Connect (OSTI)

    Klenke, S.E.; Reese, G.M.; Schoof, L.A.; Shierling, C.

    1996-01-01

    We present a software environment integrating analysis and test-based models to support optimal modal test design through a Virtual Environment for Test Optimization (VETO). A goal in developing this software tool is to provide test and analysis organizations with a capability of mathematically simulating the complete test environment in software. Derived models of test equipment, instrumentation and hardware can be combined within the VETO to provide the user with a unique analysis and visualization capability to evaluate new and existing test methods. The VETO assists analysis and test engineers in maximizing the value of each modal test. It is particularly advantageous for structural dynamics model reconciliation applications. The VETO enables an engineer to interact with a finite element model of a test object to optimally place sensors and exciters and to investigate the selection of data acquisition parameters needed to conduct a complete modal survey. Additionally, the user can evaluate the use of different types of instrumentation such as filters, amplifiers and transducers for which models are available in the VETO. The dynamic response of most of the virtual instruments (including the device under test) is modeled in the state space domain. Design of modal excitation levels and appropriate test instrumentation are facilitated by the VETO`s ability to simulate such features as unmeasured external inputs, A/D quantization effects, and electronic noise. Measures of the quality of the experimental design, including the Modal Assurance Criterion, and the Normal Mode Indicator Function are available.

  15. Demonstration and Deployment Successes: Sapphire Integrated Algal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and solvents to create refinable crude oil Sapphire Energy - IABR Accomplishments & ... has a fully integrated R&D asset pipeline, enabling creation and testing of ...

  16. Systems Analysis Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    able to withstand the harsh conditions present in geothermal reservoirs. SNL developed and tested a high-temperature downhole motor that includes an indexing tool for use with ...

  17. Simulation of hydrologic influences on wetland ecosystem succession. Master's thesis

    SciTech Connect (OSTI)

    Pompilio, R.A.

    1994-09-01

    This research focuses on the development of a simulation model to determine the affects of hydrological influences on a wetland ecosystem. The model allows perturbations to the inputs of various wetland data which in turn, influences the successional development of the ecosystem. This research consisted of converting a grassland ecosystem model to one which simulates wetland conditions. The critical factor in determining the success of wetland creation is the hydrology of the system. There are four of the areas of the original model which are affected by the hydrology. The model measures the health or success of the ecosystem through the measurement of the systems gross plant production, the respiration and the net primary production of biomass. Altering the auxiliary variables of water level and the rate of flow through the system explicitly details the affects hydrologic influences on those production rates. Ten case tests depicting exogenous perturbations of the hydrology were run to identify these affects. Although the tests dealt with the fluctuation of water through the system, any one of the auxiliary variables in the model could be changed to reflect site specific data. Productivity, Hazardous material management, Hazardous material pharmacy.

  18. Combined Pharmacomechanical Thrombolysis of Complete Portomesenteric Thrombosis in a Liver Transplant Recipient

    SciTech Connect (OSTI)

    Lorenz, Jonathan M. Bennett, Shelby; Patel, Jay; Ha, Thuong G. Van; Funaki, Brian

    2013-01-30

    Treatment options for portomesenteric venous thrombosis range from anticoagulation to surgery, depending on chronicity, severity of symptoms, extent of thrombosis, and the availability of local expertise. For acute and subacute cases, a variety of endovascular options have been described in limited published series and case reports, including thrombolysis and mechanical thrombectomy. We report what is to our knowledge the first case in which the Trellis pharmacomechanical thrombolysis device was used successfully to treat complete acute thrombosis of the entire superior mesenteric vein and the entire portal vein with extension into all segmental intrahepatic portal branches in a young adult after liver transplantation. This device, coupled with adjunctive techniques using balloon catheters, facilitated complete restoration of flow, resulting in graft salvage and long-term patency.

  19. United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

  20. Successes and Experiences of the WIPP Project

    SciTech Connect (OSTI)

    CHU,MARGARET S. Y.; WEART,WENDELL D.

    2000-09-06

    In May 1998, the US Environmental Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with all of the applicable regulations governing the permanent disposal of spent nuclear fuel, high-level waste, and transuranic radioactive waste. The WIPP, a transuranic waste repository, is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal regulations and be certified to receive wastes. Many lessons were learned throughout the 25-year history of the WIPP--from site selection to the ultimate successful certification. The experiences and lessons learned from the WIPP may be of general interest to other repository programs in the world. The lessons learned include all facets of a repository program: programmatic, managerial, regulatory, technical, and social. This paper addresses critical issues that arose during the 25 years of WIPP history and how they influenced the program.

  1. Integrated Safety Management Workshop - Building Mission Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Integrated Safety Management Workshop - Building Mission Success Acting Deputy Secretary Jeff Kupfer addresses the audience at the 2008 ISM Workshop. Over 500 U.S. Department of Energy and contractor employees started the Labor Day weekend with safety in mind. Hosted by the U.S. Department of Energy's Idaho Operations Office, along with the prime contractors at the Idaho National Laboratory Site, the 2008 Integrated Safety Management Workshop, which was held in Idaho Falls, concluded Aug. 28.

  2. Integrated Safety Management- Building Mission Success

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ISM Integrated Safety Management- Building Mission Success Approximately 500 federal and contractor employees will arrive in Idaho Falls to participate in the 2008 Integrated Safety Management Workshop, beginning Aug. 25. Hosted by the U.S. Department of Energy�s Idaho Operations Office, along with the prime contractors at the Idaho National Laboratory Site, the workshop will serve as a forum for sharing safety related practices and lessons learned, while emphasizing the importance of the use

  3. Successful Adoption of New Technology and Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Successful Adoption of New Technology and Services Track 3 Session 9 Mike Bushey Director, Government, Institutions, Agriculture, and Water Southern California Edison August 13, 2015 Energy Exchange: Federal Sustainability for the Next Decade What Are "New Technologies" * An innovative technology or service that will save our customers money or increase system efficiency * New equipment which is more efficient - Lightning - HVAC - Controls * New services or approaches that leverage

  4. Net Test

    Energy Science and Technology Software Center (OSTI)

    2001-09-01

    Nettest is a secure, real-time network utility. The nettest framework is designed to incorporate existing and new network tests, and be run as a daemon or an interactive process. Requests for network tests are received via a SSL connection or the user interface and are authorized using a ACL list (in the future authorization using Akenti will also be supported). For tests that require coordination between the two ends of the test, Nettest establishes anmore » SSL connection to accomplish this coordination. A test between two remote computers can be requested via the user interlace if the Nettest daemon is running on both remote machines and the user is authorized. Authorization for the test is through a chain of trust estabtished by the nettest daemons. Nettest is responsible for determining if the test request is authorized, but it does nothing further to secure the test once the test is running. Currently the Nettest framework incorporates lperf-vl.2, a simple ping type test, and a tuned TCP test that uses a given required throughput and ping results to determine the round trip time to set a buffer size (based on the delay bandwidth product) and then performs an iperf TCP throughput test. Additional network test tools can be integrated into the Nettest framework in the future.« less

  5. Prematurely terminated slug tests

    SciTech Connect (OSTI)

    Karasaki, K. )

    1990-07-01

    A solution of the well response to a prematurely terminated slug test (PTST) is presented. The advantages of a PTST over conventional slug tests are discussed. A systematized procedure of a PTST is proposed, where a slug test is terminated in the midpoint of the flow point, and the subsequent shut-in data is recorded and analyzed. This method requires a downhole shut-in device and a pressure transducer, which is no more than the conventional deep-well slug testing. As opposed to slug tests, which are ineffective when a skin is present, more accurate estimate of formation permeability can be made using a PTST. Premature termination also shortens the test duration considerably. Because in most cases no more information is gained by completing a slug test to the end, the author recommends that conventional slug tests be replaced by the premature termination technique. This study is part of an investigation of the feasibility of geologic isolation of nuclear wastes being carried out by the US Department of Energy and the National Cooperative for the Storage of Radioactive Waste of Switzerland.

  6. Radioisotope Thermoelectric Generator Transporation System licensed hardware second certification test series and package shock mount system test

    SciTech Connect (OSTI)

    Ferrell, P.C.; Moody, D.A.

    1995-10-01

    This paper presents a summary of two separate drop test a e performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of Title 10, Code of Federal Regulations, ``Part 71`` (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, Transit Drop Procedure (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G`s at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G`s was not exceeded in any test from a free drop height of 457 mm (18 in.).

  7. Radioisotope Thermoelectric Generator Transportation System licensed hardware second certification test series and package shock mount system test

    SciTech Connect (OSTI)

    Ferrell, P.C.; Moody, D.A.

    1996-03-01

    This paper presents a summary of two separate drop test activities that were performed in support of the Radioisotope Thermoelectric Generator (RTG) Transportation System (RTGTS). The first portion of this paper presents the second series of drop testing required to demonstrate that the RTG package design meets the requirements of {ital Title} 10, {ital Code} {ital of} {ital Federal} {ital Regulations}, {open_quote}{open_quote}Part 71{close_quote}{close_quote} (10 CFR 71). Results of the first test series, performed in July 1994, demonstrated that some design changes were necessary. The package design was modified to improve test performance and the design changes were incorporated into the Safety Analysis Report for Packaging (SARP). The second full-size certification test article (CTA-2) incorporated the modified design and was tested at the U.S. Department of Energy{close_quote}s (DOE) Hanford Site near Richland, Washington. With the successful completion of the test series, and pending DOE Office of Facility Safety Analysis approval of the SARP, a certificate of compliance will be issued for the RTG package allowing its use. The second portion of this paper presents the design and testing of the RTG Package Mount System. The RTG package mount was designed to protect the RTG from excessive vibration during transport, provide shock protection during on/off loading, and provide a mechanism for moving the RTG package with a forklift. Military Standard (MIL-STD) 810E, {ital Transit} {ital Drop} {ital Procedure} (DOE 1989), was used to verify that the shock limiting system limited accelerations in excess of 15 G{close_quote}s at frequencies below 150 Hz. Results of the package mount drop tests indicate that an impact force of 15 G{close_quote}s was not exceeded in any test from a free drop height of 457 mm (18 in.). {copyright} {ital 1996 American Institute of Physics.}

  8. EERE Success Story-Autonomie Modeling Tool Improves Vehicle Design and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Testing, Informs New Fuel Economy Standards | Department of Energy Autonomie Modeling Tool Improves Vehicle Design and Testing, Informs New Fuel Economy Standards EERE Success Story-Autonomie Modeling Tool Improves Vehicle Design and Testing, Informs New Fuel Economy Standards December 21, 2015 - 9:45am Addthis Autonomie, an advanced vehicle modeling and design software package created by Argonne National laboratory with EERE support, is helping U.S. auto manufacturers develop the next

  9. EERE Success Story-Reaching New Limits with Solar Storage | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Reaching New Limits with Solar Storage EERE Success Story-Reaching New Limits with Solar Storage February 25, 2016 - 10:49am Addthis Sunlight reflected from heliostats is shining directly on the particle receiver, which is currently being tested on top of the solar tower at the National Solar Thermal Test Facility. Sunlight reflected from heliostats is shining directly on the particle receiver, which is currently being tested on top of the solar tower at the National Solar Thermal

  10. EERE Success Story-Challenge Accepted: Reducing the Soft Costs of Going

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar | Department of Energy Challenge Accepted: Reducing the Soft Costs of Going Solar EERE Success Story-Challenge Accepted: Reducing the Soft Costs of Going Solar January 7, 2016 - 11:03am Addthis Solar installers dressed up as superheroes to complete the installation on the KidsQuest Children’s Museum in Washington as part of the Solarize Bellevue campaign. Photo by Allison DeAngelis. Solar installers dressed up as superheroes to complete the installation on the KidsQuest Children's

  11. Transition for Pantex and Y-12 Contract Completed | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Transition for Pantex and Y-12 Contract Completed July 01, 2014 The National Nuclear Security Administration Production Office and Consolidated Nuclear Security have completed one of the largest and most complex contract transitions in the history of the U.S. Department of Energy. File 2014-07-01

  12. Uranium Processing Facility Site Readiness Subproject Completed on Time and

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration | (NNSA) Uranium Processing Facility Site Readiness Subproject Completed on Time and Under Budget March 13, 2015 The Uranium Processing Facility (UPF) project celebrates its first major milestone with the completion of site readiness work, delivered on time and under budget. File 2015-03-13

  13. Apparatus for the concurrent ultrasonic inspection of partially completed welds

    DOE Patents [OSTI]

    Johnson, John A.

    2000-01-01

    An apparatus for the concurrent nondestructive evaluation of partially completed welds is described and which is used in combination with an automated welder and which includes an ultrasonic signal generator mounted on the welder and which generates an ultrasonic signal which is directed toward one side of the partially completed welds; an ultrasonic signal receiver mounted on the automated welder for detecting ultrasonic signals which are transmitted by the ultrasonic signal generator and which are reflected or diffracted from one side of the partially completed weld or which passes through a given region of the partially completed weld; and an analysis assembly coupled with the ultrasonic signal receiver and which processes the ultrasonic signals received by the ultrasonic signal receiver to identify welding flaws in the partially completed weld.

  14. Status of the irradiation test vehicle for testing fusion materials in the Advanced Test Reactor

    SciTech Connect (OSTI)

    Tsai, H.; Gomes, I.C.; Smith, D.L.; Palmer, A.J.; Ingram, F.W.; Wiffen, F.W.

    1998-09-01

    The design of the irradiation test vehicle (ITV) for the Advanced Test Reactor (ATR) has been completed. The main application for the ITV is irradiation testing of candidate fusion structural materials, including vanadium-base alloys, silicon carbide composites, and low-activation steels. Construction of the vehicle is underway at the Lockheed Martin Idaho Technology Company (LMITCO). Dummy test trains are being built for system checkout and fine-tuning. Reactor insertion of the ITV with the dummy test trains is scheduled for fall 1998. Barring unexpected difficulties, the ITV will be available for experiments in early 1999.

  15. Field Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing Wells

    SciTech Connect (OSTI)

    Cunningham, Alfred

    2015-12-21

    This research project addresses one of the goals of the U.S. Department of Energy (DOE) Carbon Storage Program (CSP) aimed at developing Advanced Wellbore Integrity Technologies to Ensure Permanent Geologic Carbon Storage. The technology field-tested in this research project is referred to as microbially induced calcite precipitation (MICP), which utilizes a biologically-based process to precipitate calcium carbonate. If properly controlled MICP can successfully seal fractures, high permeability zones, and compromised wellbore cement in the vicinity of wellbores and in nearby caprock, thereby improving the storage security of geologically-stored carbon dioxide. This report describes an MICP sealing field test performed on a 24.4 cm (9.625 inch) diameter well located on the Gorgas Steam Generation facility near Jasper, Alabama. The research was aimed at (1) developing methods for delivering MICP promoting fluids downhole using conventional oil field technologies and (2) assessing the ability of MICP to seal cement and formation fractures in the near wellbore region in a sandstone formation. Both objectives were accomplished successfully during a field test performed during the period April 1-11, 2014. The test resulted in complete biomineralization sealing of a horizontal fracture located 340.7 m (1118 feet) below ground surface. A total of 24 calcium injections and six microbial inoculation injections were required over a three day period in order to achieve complete sealing. The fractured region was considered completely sealed when it was no longer possible to inject fluids into the formation without exceeding the initial formation fracture pressure. The test was accomplished using conventional oil field technology including an 11.4 L (3.0 gallon) wireline dump bailer for injecting the biomineralization materials downhole. Metrics indicating successful MICP sealing included reduced injectivity during seal formation, reduction in pressure falloff, and

  16. Success of the Interior Lighting Campaign | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Success of the Interior Lighting Campaign Success of the Interior Lighting Campaign March 23, 2016 - 4:36pm Addthis Success of the Interior Lighting Campaign Success of the Interior Lighting Campaign Success of the Interior Lighting Campaign Success of the Interior Lighting Campaign By Andrew Mitchell As a nation, we spend more than $200 billion to power buildings in the commercial sector with lighting accounting for $40 billion of that. The Better Buildings Initiative (BB), works with a variety

  17. Graphite electrode arc melter demonstration Phase 2 test results

    SciTech Connect (OSTI)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O`Connor, W.K.; Oden, L.L.; Turner, P.C.

    1996-06-01

    Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau`s Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of {open_quotes}as-received{close_quotes} heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process.

  18. My Success Is a Success For the Whole Team | Center for Bio-Inspired Solar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fuel Production News Research Highlights Center Research News Media about Center Center Video Library Bisfuel Picture Gallery My Success Is a Success For the Whole Team 14 Feb 2014 Jaro Arero is a graduate student in the Gust Lab. He is an organic chemist working on synthesis of a variety of compounds absorbing light in the red region of the electromagnetic spectrum and feeding electrons for proton reduction catalysts. "I get to know more about science from the multidisciplinary

  19. Keys to Successful Quality Assurance and Quality Control Programs...

    Office of Environmental Management (EM)

    Keys to Successful Quality Assurance and Quality Control Programs (101) Keys to Successful Quality Assurance and Quality Control Programs (101) January 28...

  20. Working In Indian Country: Building Successful Business Relationships...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working In Indian Country: Building Successful Business Relationships with American Indian Tribes Working In Indian Country: Building Successful Business Relationships with ...