Powered by Deep Web Technologies
Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

2

Organization Name Date Submitted File Name ACEEE Steve Nadel  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submitted File Name ACEEE Steve Nadel 4/15/2011 ACEEE 4.15.2011 Alameda-Contra Coasta Transit District Chris Peeples 4/15/2011 Alameda-Contra Coasta Transit District 4.15.2011 American Academy of Arts and Sciences Robert W. Fri and Leslie C. Berlowitz 4/15/2011 American Academy of Arts and Science 4.15.2011 American Electric Power Michael L. Weinstein 4/15/2011 AEP 4.15.2011 American Gas Association, American Gas Foundation, American Public Gas Association, American Public Gas Association Research Foundation, Interstate Natural Gas Association of America, and the INGAA Foundation, Inc. Andrew K. Soto 4/15/2011 American Gas Association 4.15.2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Mark Ames 4/14/2011 American Society of Heating, Refrigerating and Air-Conditioning

3

BOARD TEST SHEET HDI LINK CARD NO. DATE  

E-Print Network (OSTI)

BOARD TEST SHEET HDI LINK CARD NO. DATE: Changes on card as delivered from loading company at the rear edge of the board. Verify that all mounting screws are loaded. Crowbar Overvoltage Trip Test Test high limit. Use bench top power supply with test clips on ends of leads. Clip supply leads directly

California at Santa Cruz, University of

4

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

5

Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with  

NLE Websites -- All DOE Office Websites (Extended Search)

Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with DOE Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with DOE July 6, 2010 - 3:08pm Addthis WASHINGTON, DC - The Department of Energy announced today that AeroSys, Inc. has agreed to pay a civil penalty of $25,000 and take a number of other actions designed to ensure its future compliance with DOE's energy efficiency standards. Last fall, the Department subpoenaed AeroSys's data on the energy use of certain heat pumps and air conditioners and then issued a demand to test 6 air conditioner models and one heat pump. DOE testing revealed that one heat pump model and two air conditioner models consumed more energy than allowed under federal efficiency standards and required AeroSys to cease distribution of those models. DOE also issued

6

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

award of the (Date) ENERGY STAR: Plant name Plant street address Plant city, state, zip code As documented by the attached Statement of Energy Performance, I affirm that the...

7

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

8

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

9

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

10

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

11

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

12

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

13

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background Purpose &...

14

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

15

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

16

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

17

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

18

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

19

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

20

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

22

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

23

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

24

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

25

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

26

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

27

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will pack, move, setup, and test the NGWTB electronic equipment. In addition, the propane tank located at CFA-666 will be relocated to CFA-661. Three propane heaters and...

28

Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

⋅ WASHINGTON, DC ⋅ LOS ANGELES ⋅ BEIJING ⋅ CHICAGO ⋅ WASHINGTON, DC ⋅ LOS ANGELES ⋅ BEIJING ⋅ CHICAGO San Francisco, CA 94104 TEL 415 875-6100 FAX 415 875-6161 www.nrdc.org NRDC Comments on DOE's April 22, 2011 Verification Testing in Support of Energy Star Proposal Submitted by: Noah Horowitz Senior Scientist Natural Resources Defense Council (NRDC) May 9, 2011 On behalf of the Natural Resources Defense Council (NRDC) and it's more than 1.3 million members and e-activists, we respectfully submit comments on DOE's Verification Testing in Support of ENERGY STAR proposal. Verification testing programs are critical to ensure that products are performing as promised and consumers are receiving the energy and utility savings claimed by the manufacturer. With one exception, NRDC strongly supports DOE's proposal for conducting verification

29

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

30

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

31

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

32

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

33

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

34

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

35

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

36

Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE CENTER * 2000 N. M63 - MD 3005 * BENTON HARBOR, MI 49022 * 269.923.4646 ADMINISTRATIVE CENTER * 2000 N. M63 - MD 3005 * BENTON HARBOR, MI 49022 * 269.923.4646 May 9, 2011 Via email Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 ESTARVerificationTesting@ee.doe.gov Re: DOE ENERGY STAR Verification Testing Program Dear Ms. Armstrong: We appreciate the opportunity to comment on the DOE Verification Testing Program that was put forth on April 22, 2011 (DOE Testing Document). As a very active member of the Association of Home Appliance Manufacturers (AHAM), we have worked closely with them in the development of the comments they have submitted (under separate cover)

37

Comment submitted by Consumers Union regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2011 Ms. Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 Via: ESTARVerificationTesting@ee.doe.gov. Re: Comments on Department of Energy's Energy Star Verification Testing Introduction Consumers Union of United States, Inc., 1 publisher of Consumer Reports®, submits the following comments in response to the U.S. Department of Energy ("DOE" or "Department") in the above-referenced matter. Comments Consumers Union has consistently urged DOE to strengthen its verification program for energy usage claims for appliances and is very 1 Consumers Union of United States, Inc., publisher of Consumer Reports®, is a nonprofit membership organization chartered in 1936 to provide consumers with information, education,

38

Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B B S H H O M E A P P L I A N C E S C O R P O R A T I O N May 9, 2011 Via E-Mail Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 ESTARVerificationTesting@ee.doe.gov Re: BSH Comments regarding the document titled "DOE Verification Testing in Support of ENERGY STAR" dated April 22, 2011. Dear Ms. Armstrong: BSH supports the efforts of the Environmental Protection Agency (EPA) and Department of Energy (DOE) to ensure products meet the labeled energy ratings. We encourage an open approach with stakeholder involvement. BSH offers the following comments for consideration. Section 6.1: Test Lab Selection * We fully agree that test labs should have ISO 17025 accreditation, but further would state

39

Comment submitted by Earthjustice regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AL AS KA C AL IF O R N I A FL O R I D A M I D - P A C I F I C N O R T H E A S T N O R T H E R N R O C K I E S N O R T H W E S T R O C K Y M O U N T A I N W A S H I N G T O N , D C I N T E R N A T I O N A L BY E-MAIL Ashley Armstrong U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 208-0121 ESTARVerificationTesting@ee.doe.gov Re: Energy Star verification testing proposal Earthjustice submits the following comments on DOE's proposed verification testing program for Energy Star certified appliances. 1. Introduction We are pleased to see DOE moving forward with a plan to verify Energy Star certifications. A strong program of verification testing is necessary to protect consumers, to fully realize the potential energy savings from the program, and to restore confidence in a brand that has

40

Comment submitted by Traulsen regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4401 Blue Mound Rd. www.traulsen.com 817 740-6733 4401 Blue Mound Rd. www.traulsen.com 817 740-6733 Fort Worth, Texas 76106 cboryca@traulsen.com 800 825-8220 Date: May 9, 2011 To: Ms. Ashley Armstrong, Ms. Brenda Edwards From: Mr. Chris Boryca, Engineer II Cc: John Davis, Walt Boryca, Gary Hoying, Mike Lynch, Joe Sanders, Jennifer Baker Reid Subject: DOE Verification in Support of Energy Star These comments are in response to the document released on April 22, 2011 related to verification testing in support of Energy Star. As a general statement Traulsen is pleased to hear that the DOE and EPA are working together. We do have several concerns, some of which the DOE has seen before and will be quickly restated. 6.3 Manufacturer Notification Traulsen believes that barring manufacturers who operate qualified "Client Test Data Program" test labs from

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: May 9, 2011 To: ESTARVerificationTesting@ee.doe.gov From: Mary Ann Dickinson, President and CEO Re: Comments on DOE Verification Testing in Support of Energy Star (www1.eere.energy.gov/buildings/appliance_standards/pdfs/estar_verification_process.pdf) The Alliance for Water Efficiency is pleased to provide DOE with comments on the above document. We are a North American non-profit organization, composed of diverse stakeholders with significant experience in water efficiency programs and conservation policies. Our mission is to promote the efficient and sustainable use of water, to promote cost-effective water efficiency measures that will reduce wasteful consumption, reduce the need for additional drinking water and waste water capacity, and provide multiple

42

Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From: Adams, Charlie From: Adams, Charlie Sent: Friday, May 06, 2011 03:38 PM To: Adams, Charlie Cc: Dana, Paul; Parker, Mike; Porter, Jerry; Schulz, Matt; Schuh, Darrell; Roy Smith; Ted Poulin; Berning, Dave; Dan Snyder Subject: Comments on ENERGY STAR verification testing program Hi, Ashley. A.O. Smith has the following comments in regard to DOE's ENERGY STAR® verification test program: * DOE and EPA appear to be working to pool the units tested under each program so that there is no double testing of units, and that all units tested count towards the total required for test during the specified period. This is great, and we appreciate their efforts. * In the selection for testing, we agree that new technologies and units that are above the Energy Star level of performance are of interest, but the majority of testing should be

43

Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energizer Battery Manufacturing, Inc 25225 Detroit Rd. Westlake, OH 44145 Energizer Comments On DOE Verification Testing in Support of ENERGY STAR 1. In the "Conditions and Criteria for Recognition of Certification Bodies for the ENERGY STAR® Program" document on page 3 it states in 3.a.i.2.a that "Annually test at least 10% of all ENERGY STAR qualified models the CB has certified or for which it has received qualified product data". Does the 10% of qualified models pertain to all products the lab has certified or is it 10% of each companies product? This is unclear, please add sufficient detail. 2. On page 7 under program funding, it states "For products tested by DOE under the ENERGY STAR verification program, DOE pays all costs for obtaining and testing products. Verification programs administered by CBs are

44

Comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 16, 2011 May 16, 2011 Ms. Ashley Armstrong U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Building Technologies Program, EE-2J 1000 Independence Avenue SW Washington, DC 20585-0121 Dear Ms. Armstrong: On behalf of Bradford White Corporation, I would like to express our appreciation for the opportunity to comment on the DOE Verification Testing in support of the ENERGY STAR ® program for water heaters. Please find the comments of Bradford White Corporation (BWC), below. Bradford White Energy strongly urges DOE and the ENERGY STAR program to adopt a five (5) percent tolerance on all Energy Factor (EF) results, no matter the number of representative test samples. The experimental error associated with the water heater EF test protocol is in excess of 5% and is well

45

Comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From: Donald C Plunkett [mailto:donplunkett@gmail.com] From: Donald C Plunkett [mailto:donplunkett@gmail.com] Sent: Wednesday, April 27, 2011 11:12 AM To: Certification@energystar.gov; ESTARVerificationTesting@ee.doe.gov Cc: luminaires@energystar.gov Subject: (EPA & DOE) Verification Testing Sample Size The EPA and DOE Energy Star verification testing program is an unfair trade practice that burdens small independent US manufacturers while benefiting large importing multinationals. The large multinational Energy Star Partners, independently or through manufacturing associations, expend "millions" of dollars lobbying the EPA and other government agencies (ref: Lobbying Reports via Lobbying Disclosure Act of 1995) to influence Energy Star programs toward their own interests. Not to mention the DOE has

46

Submitting Jobs  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitting Jobs Submitting Jobs Submitting Jobs Submitting your job If you are submitting your job on Genepool or Phoebe you do NOT need to source any batch settings. The batch environment has been loaded into your path by default. If qsub is not working properly, check to make sure that the uge module is loaded: module load uge If you are submitting a job from an external submit host you need to source the appropriate settings.sh file for Genepool or Phoebe. source /opt/uge/genepool/uge/genepool/common/settings.sh qsub commands and options UGE (Univa Grid Engine) is the batch system used for Genepool/Phoebe. Action How to do it Comment Submit a job qsub script In UGE you need to submit a script, not an executable. Specify number of processors for a threaded job qsub -pe pe_slots 8 ... Request 8 cores on a single node for your job. Please specify as many processors as will be needed during your job.

47

Comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 Via E-Mail Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 ESTARVerificationTesting@ee.doe.gov Re: DOE ENERGY STAR Verification Testing Program Dear Ms. Armstrong: On behalf of the Association of Home Appliance Manufacturers (AHAM), I would like to provide our comments on the DOE Verification Testing Program, as outlined in the document dated April 22, 2011 (DOE Testing Document). AHAM represents manufacturers of major, portable and floor care home appliances, and suppliers to the industry. AHAM's membership includes over 150 companies throughout the world. In the U.S., AHAM members employ tens of thousands of people and produce more than 95% of the household appliances shipped for sale. The factory shipment value of these products

48

Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 9, 2011 May 9, 2011 DOE Verification Program May 9, 2011 Ashley Armstrong US Department of Energy Reference: DOE Verification Testing in Support of ENERGY STAR Subject: Comments from Hobart, Div. ITW Food Equipment Group Dear Ms. Armstrong, Hobart/ITW Food Equipment Group has been working diligently with the US EPA through NAFEM to ensure that the ENERGY STAR enhancements are fair to Food Service Equipment manufacturers. One of the mainstays has always been that Commercial Food Service equipment should not be required to be verification tested by a third party laboratory. We firmly believe that the proven method of periodic inspections by third-party certification bodies is more than adequate for verifying compliance with energy consumption standards. To that end, we

49

Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOSHIZAKI AMERICA, INC. HOSHIZAKI AMERICA, INC. 618 Highway 74 South, Peachtree City, Georgia 30269 Phone (770) 487-2331 May 9, 2011 Department of Energy 1000 Independence Avenue, SW Washington DC, 20585-0121 Agency: Office of Energy Efficiency and Renewable Energy, Department of Energy Subject: Comments on DOE verification testing in support of ENERGY STAR On behalf of Hoshizaki America, Inc., thank you for the opportunity to comment on the April 22 document, "DOE Verification Testing in Support of ENERGY STAR". Based on review of the contents, Hoshizaki America encourages DOE/EPA administration to note the following: * Commercial foodservice equipment (CFE) is produced and sold in relatively low volumes with the comparison to residential appliances. Grouping CFE with

50

Comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From: Snyder, Richard A. (Roofing) [mailto:Richard.A.Snyder@saint-gobain.com] From: Snyder, Richard A. (Roofing) [mailto:Richard.A.Snyder@saint-gobain.com] Sent: Monday, May 09, 2011 1:02 PM To: ESTAR_Verification_Testing Cc: Chad.Fisher@us.ul.com; Matt.Overbee@ulenvironment.com; Brandt, Jim C. Subject: Verification Testing Concerns - Asphalt Roofing Products Importance: High Kathleen, I have many concerns and questions about Energy Star Verification program as it relates to Asphalt Roofing Shingles. I am VERY concerned because the attachment seems to imply that a decision on this matter could be made TODAY!!! Is that a possibility? I am not aware of much discussion going on, but if there is please make it public and let me know where to view it. 1) My first question is...is the attached document meant to cover asphalt roofing shingles? Many

51

Comment submitted by InterMetro Industries Corp. regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

InterMetro Industries Corp. InterMetro Industries Corp. 651 North Washington Street Wilkes-Barre, PA 18705-0557 USA T (570) 706-3121 bill.sickles@emerson.com May 5, 2011 Via email to: ESTARVerificationTesting@ee.doe.gov Certification@energystar.gov. InterMetro Industries welcomes the opportunity to comment on the DOE ENERGY STAR verification program as outlined in the April 2, 2011 DOE document. It appears

52

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

53

Date submitted: ______________________ Massachusetts Institute of Technology  

E-Print Network (OSTI)

with your research work. Name Department 1 2 The proposed program has been reviewed by the Transportation DOCTORAL PROGRAM IN TRANSPORTATION Application / Program Approval Form Instructions: · Complete all to the Transportation Graduate Program Administrative Assistant in Room 1-163. Section 1: General Information Name: MIT

Polz, Martin

54

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

55

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FAQ for: ENERGY STAR Verification Testing Pilot Program December 2010 Table of Contents Introduction............................................................................................................................... 1 What product types will be tested? ................................................................................................. 1 Will testing continue after the State Energy Efficient Appliance Rebate Program (SEEARP) ends? .................................................................................................................................................... 1 For Consumers .......................................................................................................................... 1

56

F/H Area ETF effluent (H-016 outfall), ceriodaphnia survival/reproduction test, test date: March 21, 1991  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the F/H area at Savannah River Plant affects the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher`s Exact Test and the Trimmed Spearman-Karber test to determine the effluent concentration necessary to cause statistically significant (p = 0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

57

F/H Area ETF effluent (H-016 outfall), ceriodaphnia survival/reproduction test, test date: March 21, 1991  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the F/H area at Savannah River Plant affects the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher's Exact Test and the Trimmed Spearman-Karber test to determine the effluent concentration necessary to cause statistically significant (p = 0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

58

Respectfully Submitted  

E-Print Network (OSTI)

Pt. 590 (2003), please find enclosed the application of BG LNG Services, LLC ("BGLS") for long-term authorization to import liquefied natural gas pursuant to Section 3 of the Natural Gas Act, as amended. Also please find enclosed a check for $50 made payable to the Treasury of the United States as required by 10 C.F.R. 590.207. Pursuant to 10 C.F.R. 590.202(e) and 1004.11, BGLS hereby notifies DOE that the Master LNG Sale and Purchase Agreement between BGLS and Mitsubishi International Corporation ("Sales Agreement"), which is the subject of this application, contains highly sensitive commercial information that is exempt from public disclosure. The Sales Agreement, which is attached to the application as Exhibit B, contains certain commercially sensitive terms the disclosure of which would place BGLS at a commercial disadvantage. Accordingly, BGLS is providing one original copy of the application clearly marked "Contains Confidential Information-Do Not Release " and 15 copies with the confidential information redacted from the Sales Agreement. Those copies are clearly marked "Privileged Information Removed For Confidential Treatment. " Notwithstanding the filing of a redacted copy of the application, BGLS reserves its right, pursuant to 10 C.F.R. 1004.11(c), to be notified prior to any disclosure of the confidential information and to be allowed an opportunity to submit its views with respect to such disclosure.

The Willard; Office Building; John S. Decker; Sally Kornfeld; Cm- A; Forrestal Building; Jol S. Decker

2004-01-01T23:59:59.000Z

59

F/H Area ETF effluent (H-016 outfall) ceriodaphnia survival/reproduction test, test date: December 28, 1989  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the H/F area of Savannah River Plant affect the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher`s Exact Test and Probit Analysis to determine the effluent concentration necessary to cause statistically significant (p=0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

60

F/H Area ETF effluent (H-016 outfall) ceriodaphnia survival/reproduction test, test date: December 28, 1989  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the H/F area of Savannah River Plant affect the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher's Exact Test and Probit Analysis to determine the effluent concentration necessary to cause statistically significant (p=0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Thorium-230 dating of natural waters at the Nevada Test Site  

SciTech Connect

Radiocarbon determinations have been used in the past to estimate the ages of groundwater from the Paleozoic aquifer underlying the Nevada Test Site and adjacent areas. We measured the concentrations of {sup 230}Th, {sup 232}Th, {sup 234}U and {sup 238}U in several water samples taken from the wells and spring at the Nevada Test Site and calculated the {sup 230}Th ages. 2 refs.

Bakhtiar, S.N.

1990-01-01T23:59:59.000Z

62

Comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AHRI Comments - DOE Verification Testing in Support of Energy Star AHRI Comments - DOE Verification Testing in Support of Energy Star May 9, 2011 P a g e | 1 May 9, 2010 Ms. Ashley Armstrong U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 RE: DOE Verification Testing in Support of Energy Star Dear Ms. Armstrong: I am writing on behalf of the Air Conditioning, Heating and Refrigeration Institute (AHRI) to address the proposed DOE requirements for verification testing in support of the Energy Star program. AHRI is the trade association representing manufacturers of heating, cooling, and commercial refrigeration equipment. More than 300 members strong, AHRI is an internationally recognized advocate for the industry, and develops standards for and certifies the performance of many of the

63

Submitting Organization:  

E-Print Network (OSTI)

i ii The focus of this project is to develop a new large-volume application for selfcementing coal combustion products, namely in situ stabilization of gravel roads using self-cementing CCPs. Within the reduced scope of the project, the emphasis was placed on assessing the engineering properties of two recycled materials and a natural aggregate. Laboratory experiments were conducted in which a road surface gravel (RSG), a recycled pavement material (RPM), a natural crushed aggregate (Class 5 base) were tested to determine the California bearing ratio (CBR), resilient modulus (Mr), and unconfined compressive strength (UCS). The recycled materials were blended with two fly ash contents (10 and 15%) and three curing times (7, 28, and 56 d). A Class C fly ash with 0.7 % loss on ignition was used. Resilient modulus and unconfined compression strength tests were also conducted after 5 cycles of freezing and thawing to asses the impact of freeze-thaw cycling. Unstabilized RSG and RPM had CBRs greater than that of Class 5 base, but all

Wilfung Martono; Board Regents; University Of Wisconsin-madison

2008-01-01T23:59:59.000Z

64

Comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From: Charlie Souhrada [mailto:csouhrada@nafem.org] From: Charlie Souhrada [mailto:csouhrada@nafem.org] Sent: Monday, May 09, 2011 3:46 PM To: ESTAR_Verification_Testing Subject: Verification Testing Sample Size On behalf of the North American Association of Food Equipment Manufacturers (NAFEM), thank you for the opportunity to comment on the April 22 document, "DOE Verification Testing in Support of ENERGY STAR". Based on review of the contents, NAFEM encourages DOE/EPA administration to note the following: * Commercial foodservice equipment (CFE) is produced and sold in relatively low volumes, making this product category significantly different from residential appliances. Grouping CFE with residential appliances is both technically inaccurate and economically impractical because the

65

Round-robin testing of Soleq EV cort according to the SAE J1634 test procedure dated May 1993  

DOE Green Energy (OSTI)

The Society of Automotive Engineers Recommended Practice, SAE J1634, {open_quotes}Electric Vehicle Energy Consumption and Range Test Procedure{close_quotes}, May 1993, describes a standard method of determining the range and energy consumption for electric vehicles. Consequent to the U.S. Department of Energy`s (DOE) rulemaking released on February 4, 1994, the EPA is currently considering factoring electric vehicles into the Corporate Average Fuel Economy (CAFE) calculations using the SAE J1634 procedure. The purpose of this project is to provide information regarding the suitability of this recommended practice for determining the energy economy value to be factored into the CAFE. Issues leading to possible inconsistent results (such as the repeatability of the procedure, thoroughness of the procedure`s methods, and variance between different laboratories using different dynamometers) need to be resolved prior to passing legislation which will mandate use of this test in determining the electric vehicle CAFE credit. To this end, separate tests were performed on a Soleq EVcort vehicle by the INEL, the EPA, Ford Motor Company, Southwest Research Institute, and the California Air Resources Board using their own facilities and personnel. Acceptable departures from the driving profile prescribed by SAEJ1634 are not well defined. This deficiency in the procedure is even more noticeable due to the EVcort`s marginal acceleration performance.

Cole, G.H.

1993-05-01T23:59:59.000Z

66

Issue Date: Expiration Date:  

E-Print Network (OSTI)

Discussion: Enclosed for your review and comment are the draft revisions to the FSME Procedure SA-103, Reviewing the Common Indicator, Technical Staffing and Training. SA-103 procedure describes the process and guidelines to be used by IMPEP team members when reviewing the adequacy of an NRC Region or States program for the staffing and training of technical personnel. We would appreciate receiving your comments within 30 days from the date of this letter. If you have any questions regarding this communication, please contact me at 301-415-3340 or the individual named below.

Training; Robert J. Lewis; Robert J. Lewis; A. Duncan White

2009-01-01T23:59:59.000Z

67

DOE submits Yucca Mtn  

NLE Websites -- All DOE Office Websites (Extended Search)

submits Yucca Mountain license application; Argonne contributes science, engineering support The U.S. Department of Energy reached a milestone in its efforts to help enable the...

68

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

69

Submitting PDSF Jobs  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitting PDSF Jobs Submitting PDSF Jobs Submitting PDSF Jobs Univa Grid Engine (UGE) is the batch system used at PDSF. This is a fork of the Sun Grid Engine (SGE). PDSF batch jobs have a 1 day wallclock limit. If your job attempts to run beyond the wallclock limit UGE will kill it. The total number of jobs (running, pending or otherwise) for all users is limited to 30,000 and the number of jobs a single user can have at any one time is limited to 5000. Since PDSF is a shared facility any jobs that are detrimental to the overall performance of the batch system are subject to being deleted at the discretion of the PDSF staff. If this happens, you will be notified and asked to adjust your workflow as necessary. If you are planning to submit thousands of short jobs concurrently consider

70

Microsoft Word - AHEdoeprogressreportfinalreview093009submitted  

NLE Websites -- All DOE Office Websites (Extended Search)

Use Use of Air2Air TM Technology to Recover Fresh-Water from the Normal Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants Final Report Project Dates: 7/31/06 - 9/30/09 September 30, 2009 For DOE Funding Opportunity - Advanced Technologies and Concepts to Minimize Freshwater Use in Coal-Based Thermoelectric Power Plants Funding Opportunity Number: DE-PS26-05NT42411 Instrument Number: DEFC2605NT42725 CFDA Number: 81.089 Fossil Energy Research and Development Submitting Organiazation: SPX Cooling Technologies 7401 West 129 th Street Overland Park, KS 66213 Principal Author/Investigator: Ken Mortensen Phone: 913-664-7723 Fax: 913-664-7871 E-mail: ken.mortensen@spx.com II DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof,

71

Fermilab | Tune IT Up | Submit a Question  

NLE Websites -- All DOE Office Websites (Extended Search)

Submit a Question To submit questions about cyber security at Fermilab, please complete the form below. Name: Email: Question: submit...

72

ARM - Submitting Proposals : Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

73

Final Report - Enhanced LAW Glass Formulation Testing, VSL-07R1130-1, Rev. 0, dated 10/05/07  

Science Conference Proceedings (OSTI)

The principal objective of this work was to extend the glass formulation methodology developed in the earlier work [2, 5, 6] for Envelope A, B and C waste compositions for development of compliant glass compositions targeting five high sodium-sulfur waste loading regions. This was accomplished through a combination of crucible-scale tests, and tests on the DM10 melter system. The DM10 was used for several previous tests on LAW compositions to determine the maximum feed sulfur concentrations that can be processed without forming secondary sulfate phases on the surface of the melt pool. This melter is the most efficient melter platform for screening glass compositions over a wide range of sulfate concentrations and therefore was selected for the present tests. The tests were conducted to provide information on melter processing characteristics and off-gas data, including sulfur incorporation and partitioning. As described above, the main objective was to identify the limits of waste loading in compliant glass formulations spanning the range of expected Na{sub 2}O and SO{sub 3} concentrations in the LAW glasses.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-11-13T23:59:59.000Z

74

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

75

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

76

FINAL Submitted to NREL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submitted to NREL Submitted to NREL 10-21-11 City of Naperville Case Study 1 An example of an automated switch used in Naperville's distribution automation systems. At the Forefront of the Smart Grid: Empowering Consumers in Naperville, Illinois Naperville, Illinois, is a suburban community located outside of Chicago. Typical in many ways, Naperville is the fifth largest city in Illnois and an active, engaged citizenry that is environmentally conscious and technically savvy. In fact, the National Renewable Energy Laboratory's recent assessment of leading utility green power programs ranks Naperville as No. 5 in the nation in percentage of customer participation. 1 Additionally, about one-quarter of Naperville's electricity customers pay their

77

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

78

DOE Warns Manufacturers Who Submitted Incomplete Certification Reports |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Warns Manufacturers Who Submitted Incomplete Certification Warns Manufacturers Who Submitted Incomplete Certification Reports DOE Warns Manufacturers Who Submitted Incomplete Certification Reports February 2, 2010 - 1:53pm Addthis Washington, DC - The Department of Energy's Office of General Counsel has sent warning letters to 9 manufacturers or trade associations that submitted incomplete energy-efficiency test data to comply with DOE's energy-efficiency standards. This data was submitted during the 30-day grace period that ran from December 9, 2009, to January 8, 2010. Data for about 600,000 products was submitted. In this case, however, the data was incomplete. In light of the apparent attempt to comply with Department's regulations, the warning letters simply identify various substantive deficiencies in the data submitted, demand their expeditious

79

Submitting Batch Jobs on Franklin  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Debug Jobs Short jobs requesting less than 30 minutes and requiring 512 nodes (2,048 cores) or fewer can run in the debug queue. From...

80

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

82

BUDGET KEY DATES  

Science Conference Proceedings (OSTI)

BUDGET KEY DATES. For Immediate Release: December 15, 2009. Contact: Diane Belford 301-975-8400. Budget Key Dates.

2013-06-16T23:59:59.000Z

83

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

84

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

85

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

86

Submitting Batch Jobs on Carver  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Submitting Batch Jobs Overview A batch job is the most common way users run production applications on NERSC machines. Carver's batch system is based on the PBS model, implemented with the Moab scheduler and Torque resource manager. Typically, the user submits a batch script to the batch system. This script specifies, at the very least, how many nodes and cores the job will use, how long the job will run, and the name of the application to run. The job will advance in the queue until it has reached the top. At this point, Torque will allocate the requested number of nodes to the batch job. The batch script itself will execute on the "head node" (sometimes known as the "MOM" node). See Queues and Policies for details of batch queues, limits,

87

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Basic Records, so construction contractors can submit copies of payrolls without the home addresses of individual employees and showing only the last four digits of their...

88

Submitted Work & Work in Preparation - CECM  

E-Print Network (OSTI)

May 23, 2001 ... Submitted Work & Work in Preparation. I. G. Lisle and G. J. Reid, Symmetry Classification Using Invariant Moving Frames, to be submitted.

89

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

90

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

91

Submitting Batch Jobs on Franklin  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Submitting Batch Jobs Debug Jobs Short jobs requesting less than 30 minutes and requiring 512 nodes (2,048 cores) or fewer can run in the debug queue. From 5am-6pm Pacific Time, 256 nodes are reserved for debugging and interactive use. See also, running Interactive Jobs. Sample Batch Scripts The following batch script requests 8 cores on 2 nodes with a 10 minute wall clock limit in the debug queue. Torque directive lines tell the batch system how to run a job and begin with #PBS. #PBS -q debug #PBS -l mppwidth=8 #PBS -l walltime=00:10:00 #PBS -j eo #PBS -V cd $PBS_O_WORKDIR aprun -n 8 ./a.out Here is another example requesting 8 processors using 4 nodes with only 2 cores per node: #PBS -q debug #PBS -l mppwidth=8 #PBS -l mppnppn=2 #PBS -l walltime=00:10:00

92

HEALTHCARE INFORMATION TECHNOLOGY TESTING  

Science Conference Proceedings (OSTI)

... test reports created for validation purposes and submitted to the certification body, the ... CHP Certified Health Information Technology Products List ...

2013-11-22T23:59:59.000Z

93

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

94

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

95

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

96

Final Report - Glass Formulation Testing to Increase Sulfate Volatilization from Melter, VSL-04R4970-1, Rev. 0, dated 2/24/05  

SciTech Connect

The principal objectives of the DM100 and DM10 tests were to determine the impact of four different organics and one inorganic feed additive on sulfate volatilization and to determine the sulfur partitioning between the glass and the off-gas system. The tests provided information on melter processing characteristics and off-gas data including sulfur incorporation and partitioning. A series of DM10 and DM100 melter tests were conducted using a LAW Envelope A feed. The testing was divided into three parts. The first part involved a series of DM10 melter tests with four different organic feed additives: sugar, polyethylene glycol (PEG), starch, and urea. The second part involved two confirmatory 50-hour melter tests on the DM100 using the best combination of reductants and conditions based on the DM10 results. The third part was performed on the DM100 with feeds containing vanadium oxide (V{sub 2}O{sub 5}) as an inorganic additive to increase sulfur partitioning to the off-gas. Although vanadium oxide is not a reductant, previous testing has shown that vanadium shows promise for partitioning sulfur to the melter exhaust, presumably through its known catalytic effect on the SO{sub 2}/SO{sub 3} reaction. Crucible-scale tests were conducted prior to the melter tests to confirm that the glasses and feeds would be processable in the melter and that the glasses would meet the waste form (ILAW) performance requirements. Thus, the major objectives of these tests were to: ? Perform screening tests on the DM10 followed by tests on the DM100-WV system using a LAW -Envelope A feed with four organic additives to assess their impact on sulfur volatilization. ? Perform tests on the DM100-WV system using a LAW -Envelope A feed containing vanadium oxide to assess its impact on sulfur volatilization. ? Determine feed processability and product quality with the above additives. ? Collect melter emissions data to determine the effect of additives on sulfur partitioning and melter emissions. ? Collect and analyze discharged glass to determine sulfur retention in the glass. ? Prepare and characterize feeds and glasses with the additives to confirm that the feeds and the glass melts are suitable for processing in the DM100 melter. ? Prepare and characterize glasses with the additives to confirm that the glasses meet the waste form (ILAW) performance requirements.

Kruger, Albert A.; Matlack, K. A.; Pegg, I. L.; Gong, W.

2013-11-13T23:59:59.000Z

97

Final Report - Glass Formulation Development and DM10 Melter Testing with ORP LAW Glasses, VSL-09R1510-2, Rev. 0, dated 6/12/09  

SciTech Connect

The principal objective of the work described in this Final Report is to extend the glass formulation methodology developed in the earlier work by development of acceptable glass compositions for four LAW compositions specified by ORP that cover the range of sulfate to sodium and potassium to sodium ratios expected in Hanford LAW. The glass formulations were designed to exclude titanium and iron as glass former additives, while tin and vanadium as glass former additives were evaluated for beneficial effects in increasing waste loading in the glasses. This was accomplished through a combination of crucible-scale tests and tests on the DM10 melter system. This melter is the most efficient melter platform for screening glass compositions over a wide range of sulfate concentrations and therefore was selected for the present tests. The current tests provide information on melter processing characteristics and off-gas data, including sulfur incorporation and partitioning.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-11-13T23:59:59.000Z

98

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

99

Final Report - Testing of Optimized Bubbler Configuration for HLW Melter VSL-13R2950-1, Rev. 0, dated 6/12/2013  

Science Conference Proceedings (OSTI)

The principal objective of this work was to determine the glass production rate increase and ancillary effects of adding more bubbler outlets to the current WTP HLW melter baseline. This was accomplished through testing on the HLW Pilot Melter (DM1200) at VSL. The DM1200 unit was selected for these tests since it was used previously with several HLW waste streams including the four tank wastes proposed for initial processing at Hanford. This melter system was also used for the development and optimization of the present baseline WTP HLW bubbler configuration for the WTP HLW melter, as well as for MACT testing for both HLW and LAW. Specific objectives of these tests were to: Conduct DM1200 melter testing with the baseline WTP bubbling configuration and as augmented with additional bubblers. Conduct DM1200 melter testing to differentiate the effects of total bubbler air flow and bubbler distribution on glass production rate and cold cap formation. Collect melter operating data including processing rate, temperatures at a variety of locations within the melter plenum space, melt pool temperature, glass melt density, and melter pressure with the baseline WTP bubbling configuration and as augmented with additional bubblers. Collect melter exhaust samples to compare particulate carryover for different bubbler configurations. Analyze all collected data to determine the effects of adding more bubblers to the WTP HLW melter to inform decisions regarding future lid re-designs. The work used a high aluminum HLW stream composition defined by ORP, for which an appropriate simulant and high waste loading glass formulation were developed and have been previously processed on the DM1200.

Kruger, Albert A.; Pegg, I. L.; Callow, R. A.; Joseph, I.; Matlack, K. S.; Kot, W. K.

2013-11-13T23:59:59.000Z

100

An in situ survey of Clean Slate 1, 2, and 3, Tonopah Test Range, Central Nevada. Date of survey: September--November 1993  

SciTech Connect

A ground-based in situ radiological survey was conducted downwind of the Clean Slate 1, 2, and 3 nuclear safety test sites at the Tonopah Test Range in central Nevada from September through November 1993. The purpose of the study was to corroborate the americium-241 ({sup 241}Am) soil concentrations that were derived from the aerial radiological survey of the Clean Slate areas, which was conducted from August through October 1993. The presence of {sup 241}Am was detected at 140 of the 190 locations, with unrecoverable or lost data accounting for fifteen (15) of the sampling points. Good agreement was obtained between the aerial and in situ results.

NONE

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Corrective Action Investigation Plan for Corrective Action Unit 168: Areas 25 and 26 Contaminated Materials and Waste Dumps, Nevada Test Site, Nevada (Rev. 0) includes Record of Technical Change No. 1 (dated 8/28/2002), Record of Technical Change No. 2 (dated 9/23/2002), and Record of Technical Change No. 3 (dated 6/2/2004)  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit 168 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 168 consists of a group of twelve relatively diverse Corrective Action Sites (CASs 25-16-01, Construction Waste Pile; 25-16-03, MX Construction Landfill; 25-19-02, Waste Disposal Site; 25-23-02, Radioactive Storage RR Cars; 25-23-18, Radioactive Material Storage; 25-34-01, NRDS Contaminated Bunker; 25-34-02, NRDS Contaminated Bunker; CAS 25-23-13, ETL - Lab Radioactive Contamination; 25-99-16, USW G3; 26-08-01, Waste Dump/Burn Pit; 26-17-01, Pluto Waste Holding Area; 26-19-02, Contaminated Waste Dump No.2). These CASs vary in terms of the sources and nature of potential contamination. The CASs are located and/or associated wit h the following Nevada Test Site (NTS) facilities within three areas. The first eight CASs were in operation between 1958 to 1984 in Area 25 include the Engine Maintenance, Assembly, and Disassembly Facility; the Missile Experiment Salvage Yard; the Reactor Maintenance, Assembly, and Disassembly Facility; the Radioactive Materials Storage Facility; and the Treatment Test Facility Building at Test Cell A. Secondly, the three CASs located in Area 26 include the Project Pluto testing area that operated from 1961 to 1964. Lastly, the Underground Southern Nevada Well (USW) G3 (CAS 25-99-16), a groundwater monitoring well located west of the NTS on the ridgeline of Yucca Mountain, was in operation during the 1980s. Based on site history and existing characterization data obtained to support the data quality objectives process, contaminants of potential concern (COPCs) for CAU 168 are primarily radionuclide; however, the COPCs for several CASs were not defined. To address COPC uncertainty, the analytical program for most CASs will include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons, polychlorinated biphenyls, and radionuclides. Upon reviewing historical data and current site conditions, it has been determined that no further characterization is required at USW G3 (CAS 25-99-16) to select the appropriate corrective action. A cesium-137 source was encased in cement within the vadous zone during the drilling of the well (CAS 25-99-16). A corrective action of closure in place with a land-use restriction for drilling near USW G3 is appropriate. This corrective action will be documented in the Corrective Action Decision Document (CADD) for CAU 168. The results of the remaining field investigation will support a defensible evaluation of corrective action alternatives for the other CASs within CAU 168 in this CADD.

U.S. Department of Energy, National Nuclear Security Administration Nevada

2001-11-21T23:59:59.000Z

102

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

103

Submitting Organization Hongyou Fan Sandia National Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

&24; 2007 R&D 100 Award Entry Form &24; Submitting Organization Hongyou Fan Sandia National Laboratories Advanced Materials Laboratory 1001 University Boulevard SE Albuquerque, NM...

104

Carbon Dioxide Footprint of the Northwest Power System Comments submitted by Grant County Public Utility District  

E-Print Network (OSTI)

Carbon Dioxide Footprint of the Northwest Power System Comments submitted by Grant County Public paper: Carbon Dioxide Footprint of the Northwest Power System, dated September 13, 2007. The Grant done a very thorough job of assessing the current and future carbon dioxide footprints of the Northwest

105

Submitting a Proposal to DOE | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Submitting a Proposal to DOE Submitting a Proposal to DOE Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Selecting a Host DOE Laboratory Developing a Research Proposal Recommender Information Student Participants Submitting a Proposal to DOE Application Selection Process and Notification Key Dates Frequently Asked Questions Contact WDTS Home How to Apply Submitting a Proposal to DOE Print Text Size: A A A RSS Feeds FeedbackShare Page Through direct collaboration with research staff at DOE host laboratories, the VFP program provides an opportunity for faculty to help create innovative new capabilities and make discoveries germane to DOE science missions. Through the experience, visiting faculty members also develop integrated skills that translate to programs at their home institutions,

106

Advanced Vehicle Testing Activity - Publications by Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicle Infrastructure and Usage Information (SLIDES) - February 2013 (PDF 2.8MB) SAE Hybrid Vehicle Technologies Symposium: On-Road Results from Charging Infrastructure and...

107

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

108

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

109

Release Date: August 2010 Next Release Date: August 2011  

U.S. Energy Information Administration (EIA)

Release Date: August 2010 Next Release Date: August 2011 U.S. Energy Information Administration/Renewable Energy Annual 2008 Table 1.14 Total Biomass Electricity Net ...

110

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

111

Date: _______________ Vendor Name: _______________________________  

E-Print Network (OSTI)

: ________________________ City, State, Zip:_______________________ Phone # : __________________ Fax, Nuclear Magnetic Resonance e. ___ Fire Safety-Extinguishing Systems, Bldg. Security Alarm Systems on ReX Released Re-released Faxed to Purchasing Date Initials 6-15-11 REV 0.00 0.00 0.00 0.00 0.00 0

Fabrikant, Sara Irina

112

APPLICATION FOR Version 7/03 FEDERAL ASSISTANCE 2. DATE SUBMITTED Applicant Identifier  

E-Print Network (OSTI)

. Depositional Subenvironments of Trona and Associated Lithologies in the Wilkins Peak Member of the Green River

Menke, William

113

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

114

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

115

Check for peroxides every 6 months. opened test 1 test 2 test 3  

E-Print Network (OSTI)

Check for peroxides every 6 months. opened test 1 test 2 test 3 date initials Check for peroxides every 6 months. opened test 1 test 2 test 3 date initials Check for peroxides every 6 months. Test strips can be obtained from EH&S, 5-8200 opened test 1 test 2 test 3 date initials Check for peroxides

Manning, Sturt

116

FORMS AND INSTRUCTIONS FOR SUBMITTING ELECTRIC  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION FORMS AND INSTRUCTIONS FOR SUBMITTING ELECTRIC TRANSMISSION Instructions for Electric Transmission Forms ............................................................. 6 Electric transmission, transmission corridor, data request. #12;1 Background The California Energy

117

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2014 On-line Application Opens October 18, 2013 Applications Due January 10, 2014 5:00 PM ET* Offer Notification Period Begins January 20, 2014 All DOE Offers and Notifications Complete April 1, 2014 *A research proposal co-developed with a DOE laboratory researcher must be electronically submitted by all faculty applicants as part of their

118

NIST Speeches by Date  

Science Conference Proceedings (OSTI)

... Remarks at Net-Zero Energy Residential Test Facility Ribbon ... For Advanced Manufacturing (NACFAM) Annual Washington Policy Conference, June ...

2010-10-05T23:59:59.000Z

119

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

120

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Categorical Exclusion Determination Form It Submit by E-_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

It Submit by E-_ It Submit by E-_ I'llail - ] Proposed Action Title: (0672- 1610) Eaton Corporation - Highly Efficient, Nea r-Isothermal Liquid-Piston Compressor fo r Low Cost At-Home Natural Gas Refueli ng Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Southfield, MI ; Eden Prairie, MN; Minneapolis, MN; and Milwaukee, WI Proposed Action Description: Funding will support efforts to develop a highly efficient, near isothermal liquid piston compressor for low cost, at-home natu ral gas refueling Proposed work will consist of: (1) develop and optimize a concept compressor design to achieve established performance and cost targets; (2) characterize and verify the expected performance for the compressor design; and (3) develop a compressor system prototype to test proof of

122

PARS II Process Document- Submitting & Processing Email as Offical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARS II Process Document- Submitting & Processing Email as Offical Project Action Approval Document PARS II Process Document- Submitting & Processing Email as Offical Project...

123

Video Tutorial for Submitting a 2014 ERCAP Request available  

NLE Websites -- All DOE Office Websites (Extended Search)

Video Tutorial for Submitting a 2014 ERCAP Request available Video Tutorial for Submitting a 2014 ERCAP Request available September 17, 2013 (0 Comments) Rushing to meet the...

124

MEtlORANDUM DATE  

Office of Legacy Management (LM)

---B-B TYPE OF OPERATION we s- --- Research & Development E Facility Type 0 Production scale testing 0 Pilot Scale ti Bench Seal e Process 0 Theoretical...

125

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

126

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

127

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

128

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

129

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

130

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

131

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

132

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

133

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

134

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

135

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

136

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

137

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

138

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

139

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

TYPE OF OPERATION ------ Research & Development .m vale Qppl p 4' q Facility Type 0 Hlemll stii es 0 Production eta e testing L-h Ico*vl 0 Pilot Scale' q...

140

AUTHORS DATE PP  

E-Print Network (OSTI)

The aerospace industry is showing a growing interest to apply acoustic treatment in the exhaust ducts of turbofan engines to attenuate combustion and turbine noise. The design, optimisation and testing of hot stream liners require improved theoretical models and facilities to validate and evaluate the acoustic performances of these liners under realistic engine operating conditions. To extend the capabilities for liner testing, NLR has modified an existing burner rig. The main objective was to build a facility for hot stream liner testing up to a flow Mach number of 0.4 and a maximum temperature of 500 C, which has been met. Both insertion loss and in-situ acoustic impedance measurements can be performed at maximum sound pressure levels of about 145 dB. An overview is given of the design and commissioning of the new facility, the instrumentation and the measurement techniques. Furthermore a selection of results are presented on measured insertion losses and acoustic impedances. Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR NLR-TP-2003-202

R. J. Nijboer; S. L. Sarin

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

142

Radiocarbon dating, memories, and hopes  

SciTech Connect

The history of radiocarbon dating from 1939 to the present is reviewed. The basic principles of radiocarbon dating are that cosmic rays make living things radioactive with {sup 14}C to a certain level fixed by the environment and that at death the intake of food stops so no replenishment of the {sup 14}C steadily lost by the immutable decay occurs. Therefore measurement of the degree of decay gives the time lapse since death, i.e., the radiocarbon age. The equipment developed and experiments performed to measure the specific activity of specimens to be dated are described. The results obtained by world-wide experimenters are discussed. These showed that on simultaneity radiocarbon dating is apparently reliable but that absolute dates may be incorrect by as much as 600 to 700 y. The value of radiocarbon dating to archaeologists, geologists, climatologists, and historians is stressed. (LCL)

Libby, W.F.

1972-01-01T23:59:59.000Z

143

Dates Fact Sheet.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

crossing. This enhances an asset owner's situational awareness capability beyond simple event detection and log management. The DATES monitoring platform uses multiple algorithms...

144

Next Release Date: September 2012  

Annual Energy Outlook 2012 (EIA)

October 2010 DOEEIA-0121 (201002Q) Next Release Date: September 2012 Revised: July 2012 Quarterly Coal Report April - June 2010 October 2010 U.S. Energy Information...

145

0072.htm. Accessed [date].  

E-Print Network (OSTI)

Vermont is developing a health care system that could offer a unique opportunity to test a new model for improving population health. Four lines of development converged for the system: 1) a published challenge to create a pay-for-population health system, 2) comprehensive state health reform legislation, 3) the Institute for Healthcare Improvement Triple Aim project, and 4) the concept of the accountable care organization (ACO). In phase 1 of pilot testing, 3 communities serving 10 % of the population are using the system, which is based on the enhanced medical home model. Planning is under way for phase 2 of the pilot, ACOs that use incentives based on the Triple Aim goals. Vermont has created a conceptual framework for a community health system and identified some of the practical issues involved in implementing this framework. This article summarizes the design and implementation of the enhanced medical home pilots and the results of a feasibility study for the ACO pilots. It describes how one state is using a systematic approach to health care reform to overcome some of the implementation barriers to a pay-for-population health system. Vermont will continue to provide a statewide laboratory for a pay-for-population health system.

James Hester Phd; Peer Reviewed

2010-01-01T23:59:59.000Z

146

TEST  

Science Conference Proceedings (OSTI)

This is an abstract. TEST Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras lacinia dui et est venenatis lacinia. Vestibulum lacus dolor, adipiscing id mattis sit amet, ultricies sed purus. Nulla consectetur aliquet feugiat. Maecenas ips

147

Strategic Plan Submitted to the Secretary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Volume 1, Number 3 4 Volume 1, Number 3 In This Issue * Executive Order Update * $1 Million for Manhattan Project Preservation * 2004 DOE Cultural Resources Forum * ES&H Cultural Resources Update * FPO Site Visits * Oppenheimer and the Manhattan Project Event * Museum Notes * Save America's Treasures * Featured Photo: Oak Ridge, 1949 Strategic Plan Submitted to the Secretary The strategic plan for history and heritage resources that Secretary Abraham directed the Federal Preservation Officer to prepare has been submitted and is under review. Following the December 2, 2003, briefing at which the Secretary directed preparation of a plan to make recommendations for the full range of the Department's history and heritage resources, FPO Skip Gosling and Deputy FPO Terry Fehner put together a small planning

148

Submitting Organization Hongyou Fan Sandia National Laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

 2007 R&D 100 Award Entry Form  Submitting Organization Hongyou Fan Sandia National Laboratories Advanced Materials Laboratory 1001 University Boulevard SE Albuquerque, NM 87106, USA 505-272-7128 (phone) 505-272-7336 (fax) hfan@sandia.gov AFFIRMATION: I affirm that all information submitted as a part of, or supplemental to, this entry is a fair and accurate represen- tation of this product. Submitter's signature_______________________________ Earl Stromberg Lockheed Martin Aeronautics Mail Zone 2893 PO Box 748 Fort Worth, TX 76101, USA 817-763-7376 (phone) 817-762-6911 (fax) Earl.W.Stromberg@lmco.com Self-Assembling Process for Fabricating Tailored Thin Films This simple, economical nanotechnology coating process enables the development of nanoparticle thin films

149

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

175 175 July 30,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Security Clause, DEAR 952.204-2 SUMMARY: The DOE Security Clause, DEAR 952.204-2, was amended on May 18, 2009 to augment the background check requirement and to add a drug test requirement as prerequisites for processing a request for an access authorization (security clearance). Please check to ensure that all applicable contracts have been amended to include these updated requirements. Expect personnel security to return contractor requests for access authorizations that do not include the required information. A summary of the required information is attached. This Flash and its attachment will be available online within a day, at the following

150

WIPP - How to submit a FOIA request  

NLE Websites -- All DOE Office Websites (Extended Search)

How to submit a Freedom of Information Act (FOIA) request FOIA requests to the U.S. Department of Energy Carlsbad Field Office (CBFO) may be submitted by request form, letter, fax, or e-mail. You may contact CBFO at the following address: George W. Hellstrom Freedom of Information Act/Privacy Act Public Liaison U.S. Department of Energy Carlsbad Field Office P.O. Box 3090 4021 National Parks Highway Carlsbad, New Mexico 88221-3090 foialiaison@ FOIA requests may be mailed or faxed to (505) 234-7025, e-mailed to the Freedom of Information Act /Privacy Act Public Liaison, or submitted electronically using the FOIA Request form. Clearly mark the envelope, fax, or e-mail "Freedom of Information Act request." Describe the records you are requesting as completely and accurately as possible, and provide your name, address, and telephone number. A telephone call between the requester and the FOIA contact person may be necessary to clarify a request and expedite processing time.

151

How to Submit Forms: Exclusionary List:  

U.S. Energy Information Administration (EIA) Indexed Site

CONSUMPTION OMB No. 1905-0174 Expiration Date: 12312015 Version No.: 2013.01 MONTHLY REPORT OF PRIME SUPPLIER SALES OF PETROLEUM PRODUCTS Phone No.: Doing Business as: Ext:...

152

Property:Achievement Date | Open Energy Information  

Open Energy Info (EERE)

Date Jump to: navigation, search Property Name Achievement Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:AchievementDate&oldid...

153

Control of Test Conduct  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Revision 1 Effective June 2008 Control of Test Conduct Prepared by Electric Transportation Applications Prepared by: Date: Garrett P....

154

Review of Test Results  

NLE Websites -- All DOE Office Websites (Extended Search)

GAC004 Revision 1 Effective June 2008 Review of Test Results Prepared by Electric Transportation Applications Prepared by: Date: Garrett...

155

Carbon-14 Bomb-Pulse Dating  

Science Conference Proceedings (OSTI)

Atmospheric testing of nuclear weapons during the 1950s and early 1960s doubled the concentration of carbon-14 atmosphere and created a pulse that labeled everything alive in the past 50 years as carbon moved up the food chain. The variation in carbon-14 concentration in time is well-documented and can be used to chronologically date all biological materials since the mid-1950s.

Buchholz, B A

2007-12-16T23:59:59.000Z

156

K-Ar dating of young volcanic rocks  

DOE Green Energy (OSTI)

Potassium-Argon (K-Ar) age dates were determined for forty-two young geologic samples by the Laboratory of Isotope Geochemistry, Department of Geosciences, in the period February 1, 1986 to June 30, 1989. Under the terms of Department of Energy Grant No. FG07-86ID12622, The University of Arizona was to provide state-of-the-art K-Ar age dating services, including sample preparation, analytical procedures, and computations, for forty-two young geologic samples submitted by DOE geothermal researchers. We billed only for forty samples. Age dates were determined for geologic samples from five regions with geothermal potential: the Cascade Mountains (Oregon); the Cascade Mountains (Washington); Ascension Island, South Atlantic Ocean; Cerro Prieto, Mexico; and Las Azufres, Mexico. The ages determined varied from 5.92 m.a. to 0.62 m.a. The integration of K-Ar dates with geologic data and the interpretation in terms of geologic and geothermal significance has been reported separately by the various DOE geothermal researchers. Table 1 presents a detailed listing of all samples dated, general sample location, researcher, researcher's organization, rock type, age, and probable error (1 standard deviation). Additional details regarding the geologic samples may be obtained from the respective geothermal researcher. 1 tab.

Damon, P.E.; Shafiqullah, M.

1991-01-31T23:59:59.000Z

157

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

158

104th Dates to Remember  

Science Conference Proceedings (OSTI)

Questions? Contact Connie Hilson, AOCS Exhibits Specialist, by email: connieh@aocs.org or by phone: +1 217-639-4831. Dates to Remember * January 7, 201/span>3 Online registration opens January 15, 201/span>3 Exhibitor presentations: Deadl

159

Low energy cyclotron for radiocarbon dating  

Science Conference Proceedings (OSTI)

The measurement of naturally occurring radioisotopes whose half lives are less than a few hundred million years but more than a few years provides information about the temporal behavior of geologic and climatic processes, the temporal history of meteoritic bodies as well as the production mechanisms of these radioisotopes. A new extremely sensitive technique for measuring these radioisotopes at tandem Van de Graaff and cyclotron facilities has been very successful though the high cost and limited availability have been discouraging. We have built and tested a low energy cyclotron for radiocarbon dating similar in size to a conventional mass spectrometer. These tests clearly show that with the addition of a conventional ion source, the low energy cyclotron can perform the extremely high sensitivity /sup 14/C measurements that are now done at accelerator facilities. We found that no significant background is present when the cyclotron is tuned to accelerate /sup 14/C negative ions and the transmission efficiency is adequate to perform radiocarbon dating on milligram samples of carbon. The internal ion source used did not produce sufficient current to detect /sup 14/C directly at modern concentrations. We show how a conventional carbon negative ion source, located outside the cyclotron magnet, would produce sufficient beam and provide for quick sampling to make radiocarbon dating milligram samples with a modest laboratory instrument feasible.

Welch, J.J.

1984-12-01T23:59:59.000Z

160

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

162

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

163

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

164

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

165

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

166

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

167

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

168

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

169

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

170

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

171

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

172

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

173

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

174

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

175

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

176

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

177

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

178

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

179

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

180

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

182

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

183

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

184

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

185

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

186

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and...

187

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

covers competitions. Word versions of the four templates will be available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

188

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library. This Flash and its attachments will be available online within a day, at the...

189

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the fourteen aforementioned RFP Section L and M templates are available in STRIPES as part of the series of DOE-L-1024 or DOE-M-1005 clauses. This Flash will be...

190

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

version of the three aforementioned RFP Section H and L templates are available in STRIPES. This Flash will be available online within a day, at the following website: http:...

191

Dates:  

NLE Websites -- All DOE Office Websites (Extended Search)

of the determinants of fire behavior though studying inputs (weather, slope, fuels, and fuel moisture); learn how to interpret fire behavior outputs; documentation processes; &...

192

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed without further CRM office involvement. Generating and Managing Waste - Industrial waste in the form of general construction debris such as waste concrete, scrap...

193

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

owners rely on and hold contracts with Western for access to affordable and reliable bulk power supply from the Pick Sloan hydro electric system and transmission service from the...

194

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and Managing Waste: Wooden material wastes would be generated from dimension lumber, plywood and particle board. No regulated wastes (e.g. chemicals, asbestos) are anticipated to...

195

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

existing technologies to advance weld quality monitoring and closed loop feedback for welding systems and techniques typically used in the nuclear industry. 9. Stress Corrosion...

196

Date  

E-Print Network (OSTI)

This Design Manual Chapter 1620 Supplement is to revise WSDOT policy relating to the selection of impact attenuator systems. If you maintain a printed manual, please remove the current Chapter 1620 and replace it with the August 2011 Supplement. To get the latest information on WSDOT administrative and engineering manuals, sign up for

unknown authors

2011-01-01T23:59:59.000Z

197

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Accumulation Areas (SAAs) or a <90-day storage areas before shipping to a treatment, storage, and disposal facility (TSDF). DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL...

198

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase...

199

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CERCLA Disposal Facility or at an approved off-Site facility through Waste Generator Services. 19. Work within areas Subject to Flooding - Since the well abandonment work is...

200

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

HEPA filters. These materials will be packaged and disposed of through Waste Generation Services. 19. Work in Areas Subject to Flooding - The activities discussed are planned to...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B....

202

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial...

203

Date  

E-Print Network (OSTI)

This thesis has been reviewed by the research advisor, research coordinator, and department chair and has been found to be satisfactory.

Clark David; Wilson Blockburger

2006-01-01T23:59:59.000Z

204

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render...

205

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

206

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

207

Final Report - Effects of High Spinel and Chromium Oxide Crystal Contents on Simulated HLW Vitrification in DM100 Melter Tests, VSL-09R1520-1, Rev. 0, dated 6/22/09  

SciTech Connect

The principal objective of the work was to evaluate the effects of spinel and chromium oxide particles on WTP HLW melter operations and potential impacts on melter life. This was accomplished through a combination of crucible-scale tests, settling and rheological tests, and tests on the DM100 melter system. Crucible testing was designed to develop and identify HLW glass compositions with high waste loadings that exhibit formation of crystalline spinel and/or chromium oxide phases up to relatively high crystal contents (i.e., > 1 vol%). Characterization of crystal settling and the effects on melt rheology was performed on the HLW glass formulations. Appropriate candidate HLW glass formulations were selected, based on characterization results, to support subsequent melter tests. In the present work, crucible melts were formulated that exhibit up to about 4.4 vol% crystallization.

Kruger, Albert A.; Matlack, K. S.; Kot, W.; Pegg, I. L.; Chaudhuri, M.; Lutze, W.

2013-11-13T23:59:59.000Z

208

Type: Annotation Subject: test - CECM  

E-Print Network (OSTI)

Annotation. Subject: test. Author: Vicente () Date: Monday, January 10 at 01:37 PM PST. Annotation Text: this is a test. RE: test. Author: abc on Monday, October ...

209

Dating deception: Gender, online dating, and exaggerated self-presentation  

Science Conference Proceedings (OSTI)

This study examined how differences in expectations about meeting impacted the degree of deceptive self-presentation individuals displayed within the context of dating. Participants filled out personality measures in one of four anticipated meeting conditions: ... Keywords: Gender differences, Internet, Mate selection, Personality, Self-presentation

Rosanna E. Guadagno; Bradley M. Okdie; Sara A. Kruse

2012-03-01T23:59:59.000Z

210

Effective Date: MEMORANDUM OF UNDERSTANDING  

E-Print Network (OSTI)

complementary goals in aviation and future space transportation, to coordinate planning efforts, and to haveEffective Date: MEMORANDUM OF UNDERSTANDING Between DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION IN AVIATION AND SPACE TRANSPORTATION I. PURPOSE The Department of TransportatiodFederal Aviation

211

UNDERGRADUATE HANDBOOK 2011 Final Dates  

E-Print Network (OSTI)

............................................................................................................... Friday 23 September Last day for receipt of applications to enrol for 2012 through UAC without financial to be confirmed. Semester & session dates for 2012 First Semester Information Systems Head of School and Professor of Accounting FARGHER, Professor Neil L., BCom Melb MBus RMIT

212

Data Administration Area: Date Issued  

E-Print Network (OSTI)

Policy Data Administration Policy Area: Date Issued: April, 1994 Title: Data Administration Last. INTRODUCTION The President established the Committee on Data Administration (CODA) in May, 1992, to advise him on policies in the area of data administration (attached as references Policy ADC 011 and TOR for CODA

Brownstone, Rob

213

Final Report - Glass Formulation Development and Testing for DWPF High AI2O3 HLW Sludges, VSL-10R1670-1, Rev. 0, dated 12/20/10  

Science Conference Proceedings (OSTI)

The principal objective of the work described in this Final Report is to develop and identify glass frit compositions for a specified DWPF high-aluminum based sludge waste stream that maximizes waste loading while maintaining high production rate for the waste composition provided by ORP/SRS. This was accomplished through a combination of crucible-scale, vertical gradient furnace, and confirmation tests on the DM100 melter system. The DM100-BL unit was selected for these tests. The DM100-BL was used for previous tests on HLW glass compositions that were used to support subsequent tests on the HLW Pilot Melter. It was also used to process compositions with waste loadings limited by aluminum, bismuth, and chromium, to investigate the volatility of cesium and technetium during the vitrification of an HLW AZ-102 composition, to process glass formulations at compositional and property extremes, and to investigate crystal settling on a composition that exhibited one percent crystals at 963{degrees}C (i.e., close to the WTP limit). The same melter was selected for the present tests in order to maintain comparisons between the previously collected data. The tests provide information on melter processing characteristics and off-gas data, including formation of secondary phases and partitioning. Specific objectives for the melter tests are as follows: Determine maximum glass production rates without bubbling for a simulated SRS Sludge Batch 19 (SB19). Demonstrate a feed rate equivalent to 1125 kg/m{sup 2}/day glass production using melt pool bubbling. Process a high waste loading glass composition with the simulated SRS SB19 waste and measure the quality of the glass product. Determine the effect of argon as a bubbling gas on waste processing and the glass product including feed processing rate, glass redox, melter emissions, etc.. Determine differences in feed processing and glass characteristics for SRS SB19 waste simulated by the co-precipitated and direct-hydroxide methods. The above tests were proposed based on previous tests for WTP in which there were few differences in the melter processing characteristics, such as processing rate and melter emissions, between precipitated and direct hydroxide simulants, even though there were differences in rheological properties. To the extent this similarity is found also for simulants for SRS HLW, the direct hydroxide methods may offer the potential for faster, simpler, and cheaper simulant production. There was no plan to match the yield stress and particle size of the direct hydroxide simulant to that of the precipitated simulant because that would have increased the preparation cost and complexity and defeated the purpose of the tests. These objectives were addressed by first developing a series of glass frits and then conducting a crucible scale study to determine the waste loading achievable for the waste composition and to select the preferred frit. Waste loadings were increased until the limits of a glass property were exceeded experimentally. Glass properties for evaluation included: viscosity, electrical conductivity, crystallinity (including liquidus temperature and nepheline formation after canister centerline cooling (CCC) heat-treatment), gross glass phase separation, and the 7- day Product Consistency Test (PCT, ASTM-1285) response. Glass property limits were based upon the constraints used for DWPF process control.

Kruger, Albert A.; Pegg, I. L.; Kot, W. K.; Gan, H.; Matlack, K. S.

2013-11-13T23:59:59.000Z

214

Date Date Date Date Date  

E-Print Network (OSTI)

This thesis investigates the problem of regulating the temperature of a conditioned space using a Solar Assisted Air Conditioning Systems (SAACS) prototype located at Cabo Rojo, Puerto Rico. The SAACS Prototype consists of a 66 flat plate solar collector array with 115.4 m 2 of selective surface area, a 35 kW single-effect lithium-bromide absorption chiller, a 84 kW cooling tower, a 50 kW auxiliary hot water boiler, a 5700 liter storage tank equipped with flexible stratification manifolds, and a 1800 l/hr air-handling unit. A discrete-time state-space model of the absorption chiller and a linear model of the plant to be controlled (the conditioned space) are identified and presented. Experimental data was used for the determination of these models. A temperature controller was designed and applied to the plant model. This controller operates the absorption chiller under multiple load conditions and regulates the flow in the chilled water line based on the conditioned space requirements. The designed controller was implemented in the SAACS prototype. The systems

Carlos A. Gonzlez Lozano; Miguel Vlez Reyes, Ph.D.; Gerson Beauchamp Bez, Ph.D., Ph.D.

2004-01-01T23:59:59.000Z

215

PARS II Process Document SUBMITTING AND PROCESSING EMAIL AS OFFICIAL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARS II Process Document SUBMITTING AND PROCESSING EMAIL AS OFFICIAL PROJECT ACTION APPROVAL DOCUMENTATION PURPOSE The purpose of this document is to describe the process and...

216

WebSubmit: Web-based Applications with Tcl  

Science Conference Proceedings (OSTI)

WebSubmit: Web-based Applications with Tcl ... The software is implemented as a collection of Tcl CGI scripts and a large body of Tcl support code. ...

217

Procedures for Submitting Documents for Posting on the DOE NEPA...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Submitting Documents for Posting on the DOE NEPA Website The Electronic DOE NEPA document archive is the only centralized electronic collection of DOE NEPA documents....

218

Kansas City Plant submits productivity savings under share-in...  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas City Plant submits productivity savings under share-in-savings program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation...

219

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determinations By Date September 24, 2012 CX-009335: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22 Date: 0924...

220

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

By Date April 11, 2011 CX-005702: Categorical Exclusion Determination Residential Ground Source Heat Pump Installation - Schmitz, Mary C. Date: 04112011 Location(s): Minnesota...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

222

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

223

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

224

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

225

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Revision 3 Effective February 1, 2008 Braking Test Prepared by Electric Transportation Applications Prepared by: Date: Derek Peterson...

226

Microsoft Word - 45201 Submitted Dec 2003.doc  

Office of Legacy Management (LM)

and parameter estimation 31575 m 2 220 Subsets of 220 wells analyzed Cape Cod Tracer Test Data Andricevic and Foufoula- Georgiou (1991) Plume characterization in 3-D...

227

White Papers Submitted to the Technology Innovation Program  

E-Print Network (OSTI)

White Papers Submitted to the Technology Innovation Program interested parties to submit white papers describing an area of critical national need and how those needs-risk, high-reward R&D. White papers could discuss any area of critical national need of interest

Magee, Joseph W.

228

2014 NEJC Save the Date (Spanish)  

Energy.gov (U.S. Department of Energy (DOE))

2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014

229

How to Submit a FOIA Request | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to Submit a FOIA Request | National Nuclear Security Administration to Submit a FOIA Request | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Operations > NNSA Office of General Counsel > Freedom of Information Act (FOIA) > How to Submit a FOIA Request How to Submit a FOIA Request FOIA requests to the NNSA/Office of the General Counsel may be submitted in

230

National Electric Transmission Congestion Study 2012 - How to Submit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study 2012 - How to National Electric Transmission Congestion Study 2012 - How to Submit Comments National Electric Transmission Congestion Study 2012 - How to Submit Comments You may submit written comments to Congestionstudy2012@hq.doe.gov or by mail to: Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW. Washington, DC 20585 The Department intends to use only data that is publicly available for this study. Accordingly, please do not submit information that you believe is or should be protected from public disclosure. DOE is responsible for the final determination concerning disclosure or nondisclosure of information submitted to DOE and for treating it in accordance with the DOE's Freedom of Information regulations (10 CFR 1004.11). All comments received by DOE

231

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Jump to main content. National Environmental Policy Act (NEPA) Recent Additions | Contact Us Search: All EPA Compliance and Enforcement q You are here: EPA Home q Compliance and Enforcement q National Environmental Policy Act (NEPA) q Submitting Environmental Impact Statements Submitting Environmental Impact Statements q Amended EIS Filing System Guidelines (January 2011) q Where to Submit (or "File") an EIS q Filing an EIS--Draft, Final and Supplemental q EIS Filing Procedure for Continuity of Operations Plan (COOP) Events q Notice in the Federal Register q Time Periods Amended EIS Filing System Guidelines (January 2011)

232

AGSD Task 3.5 Test Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

CMC Bench Scale Material Test Plan TOPICAL REPORT Reporting Period Start Date: February 1, 2006 End Date: May 30, 2006 Principal Authors Mark Fitzsimmons Task Development Lead...

233

Corrective Action Investigation Plan for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility, Nevada Test Site, Nevada (includes ROTC No. 1, date 01/25/1999)  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan contains the US Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 254 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 254 consists of Corrective Action Site (CAS) 25-23-06, Decontamination Facility. Located in Area 25 at the Nevada Test Site (NTS), CAU 254 was used between 1963 through 1973 for the decontamination of test-car hardware and tooling used in the Nuclear Rocket Development Station program. The CAS is composed of a fenced area measuring approximately 119 feet by 158 feet that includes Building 3126, an associated aboveground storage tank, a potential underground storage area, two concrete decontamination pads, a generator, two sumps, and a storage yard. Based on site history, the scope of this plan is to resolve the problem statement identified during the Data Quality Objectives process that decontamination activities at this CAU site may have resulted in the release of contaminants of concern (COCs) onto building surfaces, down building drains to associated leachfields, and to soils associated with two concrete decontamination pads located outside the building. Therefore, the scope of the corrective action field investigation will involve soil sampling at biased and random locations in the yard using a direct-push method, scanning and static radiological surveys, and laboratory analyses of all soil/building samples. Historical information provided by former NTS employees indicates that solvents and degreasers may have been used in the decontamination processes; therefore, potential COCs include volatile/semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, asbestos, gamma-emitting radionuclides, plutonium, uranium, and strontium-90. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

DOE /NV

1999-07-29T23:59:59.000Z

234

Corrective Action Investigation Plan for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada (Rev. No.: 0) includes Record of Technical Change No. 1 (dated 9/17/2002)  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfills used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will concentrate on geophysical surveys to confirm the presence or absence of disposed waste within a CAS and verify the boundaries of disposal areas; penetrate disposal feature covers via excavation and/or drilling; perform geodetic surveys; and be used to collect both soil and environmental samples for laboratory analyses. Phase II will deal only with those CASs where a contaminant of concern has been identified. This phase will involve the collection of additional soil and/or environmental samples for laboratory analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

IT Corporation, Las Vegas, NV

2002-05-28T23:59:59.000Z

235

Brazilian Bentonite Submitted to Mild Acid Treatment  

Science Conference Proceedings (OSTI)

Characterization of Wastes Generated during Stainless Steel Production Charpy Impact Tests in Epoxy ... Differential Characterization of Ikperejere Iron shale and Iron Sandstone Deposit ... High Temperature Exposure of Oil Well Cements.

236

Type: Annotation Subject: Test - CECM  

E-Print Network (OSTI)

Annotation. Subject: Test Author: Peter Borwein (pborwein@cecm.sfu.ca) Date: Friday, February 23 at 02:14 PM PST. Annotation Text: This is a test.

237

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

238

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2013 30, 2013 CX-010821: Categorical Exclusion Determination Manufacturing Process for Organic Light-Emitting Diode (OLED) Integrated Substrate CX(s) Applied: B3.6 Date: 07/30/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory July 30, 2013 CX-010771: Categorical Exclusion Determination Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) CX(s) Applied: B1.15 Date: 07/30/2013 Location(s): Idaho Offices(s): Nuclear Energy July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina

239

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination Down Hole Seismic Source 68-SX-11 CX(s) Applied: B3.7, B5.12 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006664: Categorical Exclusion Determination Rocky Mountain Oilfield Testing Center Process Improvement Old Pipe Yard Clean Up

240

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006069: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

HEATER TEST PLANNING FOR THE NEAR SURFACE TEST FACILITY AT THE HANFORD RESERVATION  

E-Print Network (OSTI)

B. C. , 1978. Report on Hydrofracturing Tests for In SituStress Measurements, Near Surface Test Facility, Hole DC-11,Layout for Hanford Near-Surface Test Facility. Submitted to

DuBois, A.

2010-01-01T23:59:59.000Z

242

Submit a Buy American Complaint | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Center » Submit a Buy American Complaint Action Center » Submit a Buy American Complaint Submit a Buy American Complaint Buy American Resources Section 1605 of the American Recovery and Reinvestment Act of 2009 sets forth the Buy American requirements for recipients of Recovery Act financial assistance, including EECBG recipients. If you have reason to believe that a vendor or grant recipient is violating the Buy American Requirements of the Recovery Act, which apply to iron, steel, or manufactured goods in a public works project funded by DOE, please provide the information that you have in support of that belief to BuyAmericanComplaints@hq.doe.gov. EERE Buy American Guidance Report an Appliance Regulation Violation Report Fraud to the IG Submit a Buy American Complaint FAQs Related to the Recovery Act

243

Page 1 of 22 Building Num: Date  

E-Print Network (OSTI)

Check List Page 1 of 22 Building Num: Date: Compressed Gases/WeldingChecklist Title: Action stored away from flammable materials? 1910.252(a)(2)(i) #12;Check List Page 2 of 22 Building Num: Date)(D) Is the insulation material intact on welding machine rod holders? 1910.254(d)(9)(i) #12;Check List Page 3 of 22

Homes, Christopher C.

244

ETC Action Team Progress Report Date: 6/30/08  

E-Print Network (OSTI)

ETC Action Team Progress Report Date: 6/30/08 Name of Action Team: Remote Sensing Team Leader and Radiation, EPA Regions 4, 6, 8, and 9, OSWER, OECA, OEI The American Chemical Council (ACC) The Texas) #12;Louisiana Department of Environmental Quality (LDEQ) FY07 Accomplishments: The ETV/ESTE testing

245

DEPARTMENT OF HEALTH AND HUMAN SERVICES DATE PUBLIC HEALTH SERVICE  

E-Print Network (OSTI)

DEPARTMENT OF HEALTH AND HUMAN SERVICES DATE PUBLIC HEALTH SERVICE NATIONAL INSTITUTES OF HEALTH ANIMAL HEALTH AND SHIPPING CERTIFICATE Health The animals described hereon have been examined and found on visual observation. Unless otherwise stated, no laboratory tests have been performed. I hereby certify

Bandettini, Peter A.

246

Petitioners ' Response To Comments Submitted Regarding the September 7,2006 Petition To Establish A New Generic Sub-Class for Fibers  

E-Print Network (OSTI)

following comments and additional information ('Petitioners ' Response) regarding (a) the 48 supportive comments submitted by carpet retailers and professionals, an independent testing laboratory, and a large Italian manufacturer of yarns and fabrics that support Petitioner's September 7, 2006 Petition (the "Petition") for the designation of a new generic subclass for fibers made from PIT, (b) the sole opposing comment submitted on November 9, 2007 by Invista S.a.r.!.', and (c) the proposed new generic names submitted with the Petition. a) Petitioners ' Comments Regarding Letters Submitted By Carpet Retailers and Professionals Petitioners submit that the 48 comments submitted to the FTC in support of the Petition demonstrate that the scientific evidence submitted by Petitioners correlates well with observations by carpet professionals, an independent testing laboratory, and a fabric manufacturer regarding the performance of carpet and fabric produced from PIT fibers. 1 At page 7 of Invista's comments, lnvista raises an issue unrelated to the Issues raised In the Petition regarding Mohawk's labeling of carpets manufactured from PIT fibers. Since DuPont and PIT Canada are

Made From Ptt

2008-01-01T23:59:59.000Z

247

Appropriate Acquisition Strategy PMLL Identifier: PMLL-2011-NNSS-RFS-388 (Source: User Submitted)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appropriate Acquisition Strategy Appropriate Acquisition Strategy PMLL Identifier: PMLL-2011-NNSS-RFS-388 (Source: User Submitted) Validator: Kevin Thornton, NNSA/NSO Date: 2/14/2011 Contact: Robert Platoni/702-295-0815 Statement: The selection of an acquisition strategy that is appropriate for current market conditions, funding constraints, and project scope can result in more competitive bidding and lower bid prices. Discussion: The scope of this project was to construct two new fire stations to replace existing outdated facilities. The project was originally planned as two separate projects to be constructed in two different fiscal years using a design/bid/build acquisition strategy. The funding profile was appropriate for this type of strategy. In FY2004, Congress directed that the two projects be

248

Management of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Peripheral Scope of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted) Validator: Dawn Harder Date: 12/16/2010 Contact: 505-845-6314 Statement: A common understanding of the project scope is essential for project success. Additionally, agreeing on the treatment of scope that is similar but not part of the project scope is also necessary. Discussion: The Sandia Site Office (SSO) and Sandia National Laboratories (SNL) disagreed on the treatment of two separate scopes of work and their inclusion into the Heating Systems Modernization (HSM) Project. The first scope involved the early shutdown of the steam plant. During the initial planning and design, the Engineer and the SNL Plant Engineers studied the effect(s) expected to be experienced at the steam plant as load was successively removed during the planned three years

249

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-004065: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11 Date: 10/01/2010 Location(s): Palo Alto, California Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004064: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Holbrook, Arizona Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004063: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System

250

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005656: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Flint, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005655: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Wakarusa, Indiana Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005653: Categorical Exclusion Determination Pilot-Scale Testing Evaluating the Effects of Bromine Additions on Continuous Mercury Monitors at Low Mercury Concentrations CX(s) Applied: A9, B3.6 Date: 04/28/2011

251

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-001991: Categorical Exclusion Determination Northern New Mexico College - El Rito Campus CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-001990: Categorical Exclusion Determination Highlands University CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): Las Vegas, New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000926: Categorical Exclusion Determination "Feedstock to Tailpipe Initiative": Kansas Biofuels Production, Testing and Certification Laboratory CX(s) Applied: B3.6 Date: 02/22/2010 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010

252

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2013 May 30, 2013 CX-010215: Categorical Exclusion Determination Laufer Wind Group National Wind Technology Center Structure Lighting Tests CX(s) Applied: B1.31, B5.15 Date: 05/30/2013 Location(s): Colorado Offices(s): Golden Field Office May 30, 2013 CX-010483: Categorical Exclusion Determination Man Hole Cover Assembly Replacement CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2013 CX-010508: Categorical Exclusion Determination Cloud County Community College Wind Turbine CX(s) Applied: A9, A11, B3.14 Date: 05/29/2013 Location(s): Kansas Offices(s): Golden Field Office May 29, 2013 CX-010480: Categorical Exclusion Determination Development of a Multi-User Network Testbed for Wide-Area Monitoring and

253

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008950: Categorical Exclusion Determination Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 08/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008949: Categorical Exclusion Determination Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations CX(s) Applied: A9, B3.6 Date: 08/13/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008884: Categorical Exclusion Determination Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 13, 2012 CX-008879: Categorical Exclusion Determination Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project

254

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000541: Categorical Exclusion Determination Checkout of StreamPro ADCP (Acoustic Doppler Current Profiler) Velocity Meter CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination

255

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2010 January 5, 2010 CX-000802: Categorical Exclusion Determination Transmission Electron Microscopy Specimen Preparation by Electropolishing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000803: Categorical Exclusion Determination Production of Hazardous Enhanced Chemical Cleaning Sludge Simulants CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000804: Categorical Exclusion Determination 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

256

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2013 14, 2013 CX-010493: Categorical Exclusion Determination Determining Distribution Coefficients by Surface-Enhanced Raman Spectroscopy (SERS) CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010492: Categorical Exclusion Determination Permeation Testing Metals, Ceramics, and Polymers CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010282: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): New Jersey Offices(s): National Energy Technology Laboratory May 14, 2013 CX-010281: Categorical Exclusion Determination

257

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2011 12, 2011 CX-006468: Categorical Exclusion Determination Testing Subcontractor for Fenestration System Energy Performance Rating Development and Research CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006466: Categorical Exclusion Determination Deep/Shallow Well Laboratory CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office August 11, 2011 CX-006478: Categorical Exclusion Determination

258

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-004740: Categorical Exclusion Determination Install Amonix Panels at National Solar Thermal Test Facility CX(s) Applied: B5.1 Date: 11/23/2010 Location(s): New Mexico Office(s): Sandia Site Office November 23, 2010 CX-004719: Categorical Exclusion Determination Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install) CX(s) Applied: B1.7 Date: 11/23/2010 Location(s): Louisiana Office(s): Strategic Petroleum Reserve Field Office November 23, 2010 CX-004592: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A9, A11, B3.6 Date: 11/23/2010 Location(s): Wooster, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory

259

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-006354: Categorical Exclusion Determination Extraction and Recovery of Lignin and Hemicellulose from Biomass CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006353: Categorical Exclusion Determination Grout Formulation and Variability Testing CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006349: Categorical Exclusion Determination Ohio-City-Cuyahoga Falls CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 06/23/2011 Location(s): Cuyahoga Falls, Ohio Office(s): Energy Efficiency and Renewable Energy June 23, 2011 CX-006347: Categorical Exclusion Determination

260

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2012 November 29, 2012 CX-009633: Categorical Exclusion Determination Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 28, 2012 CX-009552: Categorical Exclusion Determination Central Vermont Recovered Biomass Facility CX(s) Applied: B5.20 Date: 11/28/2012 Location(s): Vermont Offices(s): Golden Field Office November 28, 2012 CX-009547: Categorical Exclusion Determination Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project')

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2011 15, 2011 CX-006137: Categorical Exclusion Determination B39 Cellular Repeater Installation CX(s) Applied: B1.7 Date: 06/15/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006136: Categorical Exclusion Determination Field Testing of Low Impact Oil Field Roads CX(s) Applied: B3.7 Date: 06/15/2011 Location(s): Webb County, Texas Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006079: Categorical Exclusion Determination Topic 7A, Emergency Backup Power Systems CX(s) Applied: A9, B5.1 Date: 06/15/2011 Location(s): Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 14, 2011 CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable

262

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6 Date: 10/18/2010 Location(s): Reno, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004290: Categorical Exclusion Determination Greenfield Community College - Geothermal Project CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

263

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-009375: Categorical Exclusion Determination A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data CX(s) Applied: A9 Date: 09/17/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009374: Categorical Exclusion Determination Development of a Carbon Dioxide Chemical Sensor for Downhole Carbon Dioxide Monitoring in Carbon Sequestration CX(s) Applied: B3.6 Date: 09/17/2012 Location(s): New Mexico Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009373: Categorical Exclusion Determination Testing of an Advanced Dry Cooling Technology for Power Plants CX(s) Applied: B3.6 Date: 09/17/2012 Location(s): North Dakota Offices(s): National Energy Technology Laboratory September 17, 2012

264

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 22, 2012 February 22, 2012 CX-007929: Categorical Exclusion Determination Midwest Region Alternative Fuels Project: Black Hills Energy Compressed Natural Gas Infrastructure CX(s) Applied: B5.22 Date: 02/22/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007928: Categorical Exclusion Determination Game Changing Technology of Polymeric-Surfactants for Tertiary Oil CX(s) Applied: A9, B3.6 Date: 02/22/2012 Location(s): Indiana Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007927: Categorical Exclusion Determination Compressor Testing of Next Generation Refrigeration Lubricants CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007926: Categorical Exclusion Determination

265

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 1, 2012 CX-008288: Categorical Exclusion Determination Decommissioning of the Appliance Testing and Evaluation Center in Morgantown CX(s) Applied: B3.6 Date: 05/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008287: Categorical Exclusion Determination Technology Integration Program CX(s) Applied: A9 Date: 05/01/2012 Location(s): CX: none Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008286: Categorical Exclusion Determination Technology Integration Program CX(s) Applied: A9, A11, B3.6 Date: 05/01/2012 Location(s): Tennessee Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008285: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22

266

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-009619: Categorical Exclusion Determination Dissolution of Sludge Constituents in Glycolate-Containing 2H Evaporator Rad Feed Solution CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009618: Categorical Exclusion Determination Defense Threat Reduction Agency (DTRA) Radar Testing CX(s) Applied: B3.1 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009617: Categorical Exclusion Determination Gas Mass Spectrometry CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009432: Categorical Exclusion Determination Transformational Approach to Reducing the Total System Costs of Building

267

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005332: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7 Date: 02/28/2011 Location(s): Wichita, Kansas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 28, 2011 CX-005329: Categorical Exclusion Determination Fluid-Bed Testing of GreatPoint Energy's Direct Oxygen Injection Catalytic Gasification Process CX(s) Applied: B3.6 Date: 02/28/2011 Location(s): Grand Forks, North Dakota Office(s): Fossil Energy, National Energy Technology Laboratory February 28, 2011 CX-005301: Categorical Exclusion Determination Alaska-Tribal Energy Program-The Tatitlek Corporation CX(s) Applied: A9, A11 Date: 02/28/2011 Location(s): Tatitlek, Alaska Office(s): Energy Efficiency and Renewable Energy

268

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

269

Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/2/11 6/2/11 Comments to the following DOE Proposed Rules: 10 CFR Part 431 [Docket No. EERE-2010-BT-TP-0036] RIN 1904-AC38 Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Automatic Commercial Ice Makers Submitted by: Mary C. Howe, President, Howe Corporation, Chicago, IL 60642 mchowe@howecorp.com CORPORATION 1650 N Elston Ave * Chicago, IL. 60642 * (773) 235-0200 * Fax (773) 235-0269 * E-mail: howeinfo@howecorp.com 2 Item 1 - DOE also requests comment on the proposal that the use of amended test procedure be required upon the effective date of any test procedure final rule, 30 days after publication in the Federal Register. In the case of the addition of continuous production remote condenser ACIM's, the outside testing

270

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

271

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 CX-001501: Categorical Exclusion Determination Commercial Renewable Energy Systems - FLS Meadowood Garden Solar CX(s) Applied: B5.1 Date: 04012010 Location(s):...

272

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Non-Contaminating Cryogenic Fracturing Technology CX(s) Applied: B3.6 Date: 12202011 Location(s): Colorado Offices(s):...

273

High Precision Radiometric Dating of Sedimentary Materials  

SciTech Connect

To develop field, petrographic and geochemical criteria to allow high precision U-Pb dating of sedimentary minerals within rapidly deposited sequences of carbonate and clastic rocks.

Hanson, G. N.

2006-09-19T23:59:59.000Z

274

Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL  

E-Print Network (OSTI)

Feb 2003 Date: ____________ MATERIAL FOR HAZARDOUS WASTE DISPOSAL 1) Source: Bldg: ________________________________________ Disinfection? cc YES, Autoclaved (each container tagged with `Treated Biomedical Waste') cc YES, Chemical

Sinnamon, Gordon J.

275

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Portland) CX(s) Applied: A9 Date: 03012010 Location(s):...

276

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Gulf of Mexico 3-Dimensional Operational Ocean Forecast System Pilot Project (Los Angeles) CX(s) Applied: A9 Date: 03012010 Location(s):...

277

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 2011 CX-006930: Categorical Exclusion Determination Next Generation Inverter Design CX(s) Applied: B3.6 Date: 09282011 Location(s): Torrance, Los Angeles...

278

A NEW TEST METRIC AND A NEW SCAN ARCHITECTURE FOR EFFICIENT VLSI TESTING  

E-Print Network (OSTI)

A NEW TEST METRIC AND A NEW SCAN ARCHITECTURE FOR EFFICIENT VLSI TESTING A DISSERTATION SUBMITTED. To overcome the difficulty and cost of VLSI testing, we need to search for better testing techniques. Chip testing can be classified into two categories: production testing and characterization testing

Stanford University

279

AHAM - CCE Overview and Update, dated 06/07/2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AHAM AHAM CCE Overview and Update June 7, 2011 1 2 3 4 5 6 Agenda Certified Ratings Definitions Certification Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory) for * May elect to use a third-party (e.g., certified laboratory) for testing and certification purposes. * Must determine certified ratings through testing.

280

AHAM - CCE Overview and Update, dated 06/07/2011  

NLE Websites -- All DOE Office Websites (Extended Search)

AHAM AHAM CCE Overview and Update June 7, 2011 1 2 3 4 5 6 Agenda Certified Ratings Definitions Certification Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory) for * May elect to use a third-party (e.g., certified laboratory) for testing and certification purposes. * Must determine certified ratings through testing.

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Using neighbors to date web documents  

Science Conference Proceedings (OSTI)

Time has been successfully used as a feature in web information retrieval tasks. In this context, estimating a document's inception date or last update date is a necessary task. Classic approaches have used HTTP header fields to estimate a document's ... Keywords: link analysis, web dynamics, web information retrieval

Srgio Nunes; Cristina Ribeiro; Gabriel David

2007-11-01T23:59:59.000Z

282

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

283

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 2010 October 1, 2010 CX-004064: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Holbrook, Arizona Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004063: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Wilsonville, Alabama Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004062: Categorical Exclusion Determination Strategy to Accelerate United States Transition to Electric Vehicles

284

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD EL QOTBI Tuna EL QOTBI Noemie FATMI Karine CLAIR Florian KNISCH Guillaume NAHON Charlotte SEHMOUNE Nabil AD : A

Douai, Antoine

285

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Laboratory November 23, 2009 CX-000206: Categorical Exclusion Determination Michigan Biogas Center of Excellence CX(s) Applied: A9, B3.6 Date: 11232009 Location(s): Flint,...

286

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery and Reinvestment Act State Energy Program - Estacada School District Biomass Boilers CX(s) Applied: B5.1 Date: 08032010 Location(s): Estacada, Oregon Office(s): Energy...

287

Property:PublicationDate | Open Energy Information  

Open Energy Info (EERE)

"PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2.8-Ma Ash-Flow Caldera At Chegem River In The Northern Caucasus Mountains (Russia),...

288

102nd Annual Meeting Dates to Remember  

Science Conference Proceedings (OSTI)

Dates to Remember November 1, 2010 Online registration opens January 7, 2011 Exhibitor Presentations: Deadline for abstracts to be printed in the abstract book January 31, 2011 Last day for early booth rental fees January 31, 2011 Booths cance

289

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Development of Water Based, Critical Flow, Non-Vapor-Compression Cooling Cycle CX(s) Applied: B3.6 Date: 04302012 Location(s): Kansas...

290

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 CX-009271: Categorical Exclusion Determination National Governors Association Energy Project - Phase II CX(s) Applied: A9, A11 Date: 09102012 Location(s): CX: none...

291

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B1.23 Date: 09242012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory September 24, 2012 CX-009336: Categorical Exclusion...

292

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for High Performance Hospitals CX(s) Applied: A9, A11 Date: 09302010 Location(s): San Francisco, California Office(s): Energy Efficiency and Renewable Energy, National...

293

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

294

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B3.6 Date: 03172010 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory March 17, 2010 CX-001327: Categorical...

295

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 CX-008228: Categorical Exclusion Determination Hydropower Energy Resource (HyPER) Harvester CX(s) Applied: A9 Date: 04112012 Location(s): New Mexico Offices(s): Golden...

296

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Golden Field Office November 24, 2010 CX-004532: Categorical Exclusion Determination Tidal Energy System for On-Shore Power Generation CX(s) Applied: A9, B3.6 Date: 11242010...

297

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Low-Cost Integrated Substrate for Organic Light-Emitting Diode (OLED) Lighting (Ewing) CX(s) Applied: B3.6 Date: 03192010 Location(s):...

298

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Reactor Technology for Hydro processing Bio-oils to Produce Gasoline, Diesel and Jet Fuel CX(s) Applied: A9, B3.6 Date: 05022011 Location(s): Maryland Office(s): Energy...

299

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Energy Program- ARRA Revolving Loan Fund- Ivan Smith Furniture- Compressed Natural Gas Vehicle Fueling Stations CX(s) Applied: B5.1, B5.22 Date: 02112013 Location(s):...

300

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar - Roof Mounted - Ebay CX(s) Applied: B5.1 Date: 02082011 Location(s): South Jordan, Utah Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Categorical Exclusion (CX) Determinations By Date | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Laboratory April 11, 2011 CX-005602: Categorical Exclusion Determination Jet Drilling With Energized Fluids CX(s) Applied: B3.6, B3.7 Date: 04112011 Location(s):...

302

BESC Submits 32 Gene Disclosures for Patents | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

News Careers Work with ORNL About ORNL Visiting ORNL Events and Conferences Highlights Success Stories Contact Us Index Home | ORNL | Highlights SHARE BESC submits 32 gene disclosures for future patents July 01, 2012 Plant geneticist Wellington Muchero examines phenotypic traits of Populus transgenic lines grown in a greenhouse. The Bioenergy Science Center (BESC) at Oak Ridge National Laboratory (ORNL) is preparing invention disclosures for 32 different genes that can help improve the yield of ethanol from cellulosic biomass. These genes or their variants function to overcome recalcitrance-difficulty in breaking down cellulosic biomass to release sugars. Several members of ORNL's Biosciences Division are submitting disclosures: 16 genes by Wellington Muchero, 10 genes by Udaya Kalluri, and

303

Instructions for Submitting Documents to OpenNet  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submitting Documents to OpenNet Submitting Documents to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't already have one, go to the OpenNet web site at: http://www.osti.gov/opennet. 1. Click on the LOGIN link on the top right. 2. Read the information and check the "I agree..." box. 3. Click on the "Request data submission access..." link at the bottom of the page. 4. Fill out the form. One of the required fields is the Site Input Code field. This field provides a drop down list of DOE Sites. All users with the same Site Input Code can edit all the records for that site. If your Site Code is not in the list or you need a site code more specific to your office than those listed,

304

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004278: Categorical Exclusion Determination Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide CX(s) Applied: A9 Date: 10/19/2010 Location(s): Clarkstown, New York Office(s): Fossil Energy, National Energy Technology Laboratory October 19, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6

305

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-001102: Categorical Exclusion Determination Recovery Act: Clemson University Wind Turbine Testing Facility CX(s) Applied: A9 Date: 03/02/2010 Location(s): North Charleston, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 2, 2010 CX-001037: Categorical Exclusion Determination Low-Cost Illumination Grade Light Emitting Diodes (LEDs) CX(s) Applied: B3.6, B5.1 Date: 03/02/2010 Location(s): San Jose, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 2, 2010 CX-001036: Categorical Exclusion Determination Solution Processable Transparent Conductive Hole Injection Electrode for Organic Light Emitting Diode (OLED) Solid State Lighting (Pennsylvania) CX(s) Applied: B3.6

306

Clean Cities: Submitting Project Ideas for the Clean Cities National Parks  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitting Project Ideas for the Clean Submitting Project Ideas for the Clean Cities National Parks Initiative to someone by E-mail Share Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Facebook Tweet about Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Twitter Bookmark Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Google Bookmark Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Delicious Rank Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Digg Find More places to share Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on AddThis.com... Goals & Accomplishments

307

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

308

Facility Owner Contractor Award Date End Date Options/Award Term  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OptionsAward Term Ultimate Potential Expiration Date Contract FY Competed Parent Companies LLC Partners DOE Site Procurement Director DOE Contracting Officer SLAC National...

309

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

310

Computational Age Dating of Special Nuclear Materials  

SciTech Connect

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

311

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

312

Type: Annotation Subject: test - CECM  

E-Print Network (OSTI)

Annotation. Subject: test. Author: jack Ho (ho@cecm.sfu.ca) Date: Wednesday, February 21 at 11:21 AM PST. Annotation Text: This is only a test, please ignore.

313

Type: Annotation Subject: Test - CECM  

E-Print Network (OSTI)

Annotation. Subject: Test Author: Jack Ho (ho@cecm.sfu.ca) Date: Wednesday, February 21 at 11:33 AM PST. Annotation Text: This is a test, please ignore...

314

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: _________ Roberta Brayer Approved by: _________________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP06 Revision 2 i TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Initial Conditions and Prerequisites 1 5. Testing Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices Appendix A - Handling Pad Test Data Sheet 8

315

Non-Unit Faculty Effective Date  

E-Print Network (OSTI)

SUBJECT: Non-Unit Faculty Evaluation Effective Date: 05-18-11 Policy Number: 4-500.1 Supersedes: 4 Adoption: 03-30-05 APPLICABILITY/ACCOUNTABILITY: This policy is applicable to all units and departments that employ non-unit faculty employees in regular positions. POLICY STATEMENT: Non-unit faculty members

Glebov, Leon

316

SAVE THE DATE! UC Energy Week 2011  

E-Print Network (OSTI)

SAVE THE DATE! UC Energy Week 2011 April 4 - 7, 2011 Hosted by the University of California, Davis Building on the success of the 2010 UC Energy Week, the California Renewable Energy Collaborative (CREC) is primed to host UC Energy Week 2011. The event consists of a global energy symposium, three forums

Islam, M. Saif

317

CURRICULUM VITAE Date: December 23, 2010  

E-Print Network (OSTI)

Medical Center (Australia), 2006. Courtney Harrison, University of Kentucky, 2006. Alena Mozhaeva, Joint: Institution: National University of La Plata, Medical School, La Plata, Buenos Aires, Argentina Degree: M.D. Date of Graduation: 1984 Institution: National University of La Plata Medical School, La Plata, Buenos

318

Property:Geothermal/AwardDate | Open Energy Information  

Open Energy Info (EERE)

AwardDate Jump to: navigation, search Property Name GeothermalAwardDate Property Type String Description Award Date Retrieved from "http:en.openei.orgwindex.php?titleProperty...

319

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

320

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EV Project Overview Report - Project to Date through March 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

to date through March 2012 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity Consumed (AC MWh)...

322

Diesel Engine idling test appendiz a-j  

NLE Websites -- All DOE Office Websites (Extended Search)

73432 Miles on Filter Months on Filter Bus 73433 Miles on Filter Months on Filter Start Test Date 2112003 1242002 Start Test Mileage 47612 0 0 198671 0 0 1 Filter Change Date...

323

This form may be submitted to the EIA by mail, fax, e-mail, or secure file trans  

U.S. Energy Information Administration (EIA) Indexed Site

notice914.jsp" notice914.jsp" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"OMB No. 1905-0205" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Expiration Date: 05/31/2015" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Burden: 3 hours" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"MONTHLY NATURAL GAS PRODUCTION REPORT",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Version No.: 2011.001" "FORM EIA-914" "This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this form, see the form instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction."

324

DATE: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH 2005..19 March 1, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management STARS Conversion In April 2005, the Department will be converting to the new Standard Accounting and Reporting System (STARS). Department contractors and vendors will be encouraged to submit invoices early for goods or services to be delivered in March 2005 so they can be processed and paid by the end of the month. For such payment, invoices must be received by the Oak Ridge Financial Service Center not later than March 17,2005, and approving officials must provide their approvals by March 24,2005. Page 1 of2 To ensure a smooth transition, a one-time, limited delegation of Contracting Officer authority has been granted to the Director at Oak Ridge Financial Service Center for the purpose of signing

325

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

326

Program solicitation. Closing date: March 1, 1995  

Science Conference Proceedings (OSTI)

This document is a solicitation for small business to participate in innovation research. The Department of Energy (DOE) invites small business concerns to submit grant applications under this thirteenth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described in Appendix 1 are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include increasing private sector commercialization of technology developed through DOE-supported R and D, stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal research and R and D needs, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

Not Available

1995-01-01T23:59:59.000Z

327

Program solicitation: Closing date, January 22, 1988  

SciTech Connect

DOE invites small business firms to submit proposals in this sixth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal R and D needs, increasing the commercial application of DOE-supported research results, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

1987-01-01T23:59:59.000Z

328

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

329

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network (OSTI)

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration Flow Coil Design etc. Finger Print Relationship Every evaporator is unique Unstable Region * = examples

Oak Ridge National Laboratory

330

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

331

Research Highlights Sorted by Submission Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

332

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

333

PURADYN Oil Bypass Filtration System Evaluation Test Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

& Infrastructure Department PURADYN OIL BYPASS FILTRATION SYSTEM EVALUATION TEST PLAN October 2002 Reviewed: INEEL Fleet Maintenance Supervisor (Thomas) Date Reviewed:...

334

Submitted to: Submitted by:  

E-Print Network (OSTI)

In preparing this report, we received support and assistance from many individuals. We would first like to thank the individuals involved with collecting and processing the survey data on which this report is based: Martha Kovac, who directed the survey, her assistant Betsy Santos, and the many other staff who assisted in developing the survey instrument and conducting the survey interviews; John Hall, who led the sampling and weight development, and his assistant Yuhong Zheng. We also thank several individuals at the Santa Clara Family Health Plan (SCFHP) for their ongoing and thoughtful assistance with the data collection process: John Pawlyshyn and Karen Gregory, who provided the administrative data files on which the survey sample is based and offered ongoing consultation on these files; Mayra Koenig, who, along with her phone center staff, conducted initial calls to families selected for the survey; and Janie Tyre and Pat Posey, who provided information on a range of issues related to the Healthy Kids program and our data collection efforts. We also thank outreach staff at the SCFHP, the Health Trust and the Santa Clara Valley Health and Hospital System (SCVHHS), along with staff at the Services, Immigration Rights, and Education Network (SIREN) in Santa Clara County, for providing information about the study to the community. Finally, we thank the pair of skilled programmers who assisted us with the analysis of the survey and administrative data files:

Christopher Trenholm; Embry M. Howell; Dana Hughes; Sean Orzol; The David; Lucile Packard Foundation; Christopher Trenholm Acknowledgments

2005-01-01T23:59:59.000Z

335

Test Automation Test Automation  

E-Print Network (OSTI)

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

336

Updated: September, 2012 Intent to Hold FPM Course/Test  

E-Print Network (OSTI)

Updated: September, 2012 FORM A Intent to Hold FPM Course/Test Which course are you conducting? (check only one) 2-day course 1-day course Test only Re-Test only Test & Re-Test Food Handlers What date(s) are you conducting the training/testing? ______________________________ (mm

337

Nanoparticle toxicity testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanoparticle toxicity testing Nanoparticle toxicity testing 1663 Los Alamos science and technology magazine Latest Issue:November 2013 All Issues » submit Nanoparticle toxicity testing Assessing the potential health hazards of nanotechnology March 25, 2013 Robot In the search for more accurate and efficient techniques to evaluate the health hazards of nanoparticles, Los Alamos researchers are developing artificial human tissues and organs to replace animal test subjects. A new approach to toxicity testing under development at Los Alamos uses artificial tissue and artificial organs instead of animal testing Manufactured nanoparticles such as buckyballs and carbon nanotubes, used in products ranging from sunscreens to solar panels, are proliferating so quickly that safety testing for potential health hazards-similar to those

338

Rough Ride Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

NTP005 NTP005 Revision 2 Effective December 1, 2004 Electric Vehicle Rough Road Course Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: _______________ Donald B. Karner ©2004 Electric Transportation Applications All Rights Reserved Procedure ETA-NTP005 Revision 2 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Testing Activity Requirements 6 6.0 Glossary 12 7.0 References 14 Appendices Appendix A - Electric Vehicle Rough Road Test Data Sheet 15

339

Submit Your Home Energy Efficiency Questions Now for Earth Day Google+  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submit Your Home Energy Efficiency Questions Now for Earth Day Submit Your Home Energy Efficiency Questions Now for Earth Day Google+ Hangout Submit Your Home Energy Efficiency Questions Now for Earth Day Google+ Hangout April 2, 2013 - 10:40am Addthis Submit a video question now for our Earth Day Google+ Hangout on home energy efficiency. | Graphic courtesy of Sarah Gerrity, Energy Department. Submit a video question now for our Earth Day Google+ Hangout on home energy efficiency. | Graphic courtesy of Sarah Gerrity, Energy Department. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs How can I participate? Submit a video question in advance. All you need to do is create a 30-second video, upload it to YouTube before April 16 and tag it with #askEnergy. Email your questions to newmedia@hq.doe.gov.

340

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

Mazda 3 i-Stop Mazda 3 i-Stop Test Cell Location APRF- 4WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional- Start Stop Vehicle Dynamometer Input Document Date 11/20/2012 Advanced Powertrain Research Facility Test weight [lb] 3250 Vehicle Dynamometer Input Document Date 11/20/2012 Revision Number 1 Advanced Powertrain Research Facility Test weight [lb] Target A [lb] 3250 31.2 Target B [lb/mph] Target C [lb/mph^2] 0.462 0.014 Test Fuel Information - Vehicle equipped with with i-Stop package - Manual Transmission - All tests completed in ECO mode - EPA shift schedule modified based on vehicle shift light activity Revision Number 1 Notes: Fuel type EPA Tier II EEE Gasoline Test Fuel Information - Vehicle equipped with with i-Stop package

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Thme Date Enseignant Thme Date Enseignant AKIN Tuna Suites 16-mai AD Equa diff 24-mai RL  

E-Print Network (OSTI)

Page 1 Page 1 Thème Date Enseignant Thème Date Enseignant AKIN Tuna Suites 16-mai AD Equa diff 24 Probas 23-mai MAC Thème Date Enseignant Thème Date Enseignant AKIN Tuna Configurations 31-mai DT Arithm

Douai, Antoine

342

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

343

NREL: Hydrogen and Fuel Cells Research - Safety Sensor Testing...  

NLE Websites -- All DOE Office Websites (Extended Search)

R. Burgess, M. Post, C. Rivkin Publication Date: July 2012 Standard Hydrogen Test Protocols for the NREL Sensor Testing Laboratory Publication Type: Brochure Authors: J....

344

Advanced Vehicle Testing Activity - Medium and Heavy Duty Hybrid...  

NLE Websites -- All DOE Office Websites (Extended Search)

an electric vehicle. Medium and heavy duty HEV testing results to date are posted below. Vehicle Testing Reports INL Hybrid Shuttle Busses INL Hybrid Shuttle Busses INL Hybrid...

345

Flow Test At Colrado Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Colrado Area (DOE GTP) Exploration Activity Details Location Colado Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

346

Year of Birth Determination Using Radiocarbon Dating of Dental Enamel  

Science Conference Proceedings (OSTI)

Radiocarbon dating is typically an archaeological tool rather than a forensic one. Recently however, we have shown that the amount of radiocarbon present in tooth enamel, as a result of nuclear bomb testing during the cold war, is a remarkably accurate indicator of when a person is born. Enamel isolated from human teeth is processed to form graphite and carbon-14 ({sup 14}C) levels are measured using accelerator mass spectrometry. Since there is no turnover of enamel after it is formed, {sup 14}C levels in the enamel represent {sup 14}C levels in the atmosphere at the time of its formation. In this paper we describe the strategy used to determine the date of birth of an individual based on radiocarbon levels in tooth enamel, focusing on the methodology of this strategy. Year of birth information can significantly assist police investigators when the identity of a deceased individual is unknown. In such cases police will try to match particulars of the unidentified individual (which is often only gender and/or an estimate of age), with particulars from missing persons lists.

Buchholz, B A; Spalding, K L

2009-03-10T23:59:59.000Z

347

PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993  

SciTech Connect

This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

Not Available

1993-10-01T23:59:59.000Z

348

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Revision 1 Effective June 2008 Battery Capacity and Depth of Discharge Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP003 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

349

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Revision 1 Effective June 2008 Traction System Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP002 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

350

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Revision 1 Effective June 2008 Electromagnetic Interference and Susceptibility Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP004 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

351

Home Energy Score: Analysis & Improvements to Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Energy Score: Home Energy Score: � Analysis & Improvements to Date � Joan Glickman Senior Advisor/Program Manager U.S. Department of Energy July 24, 2012 1 eere.energy.gov Presentation Overview 1) Background 2) Program Improvements 3) Analysis: Efficacy of Tool & Program - Asset Perturbations - Behavior Perturbations - Estimated Energy Use vs. Actual Energy Use (from utility bills) - Time Required for Assessment and Scoring - Blower Door Test Analysis 4) Next Steps & Ongoing Analysis 2 eere.energy.gov 1. Background � 3 eere.energy.gov Guiding Principles * Information must be credible, reliable, and replicable. * Information must be transparent and easy to understand. � * Implementation costs must be affordable. * Program must include effective quality assurance.

352

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

353

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

354

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

355

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

356

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

357

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

358

DOE-EA-1184 Date Prepared:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

359

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

360

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

362

NIST Submits Updated Master Plan for Gaithersburg Campus  

Science Conference Proceedings (OSTI)

... future needs," says Stella Fiotes, NIST's Chief Facilities Management Officer. ... a Net-Zero Energy Residential Building, funded by ARRA, will test and ...

2010-10-05T23:59:59.000Z

363

Submitted to Solar Energy (Nov. 2011) Complete article Accepted version (v1, Jul. 2012)  

E-Print Network (OSTI)

Submitted to Solar Energy (Nov. 2011) Complete article Accepted version (v1, Jul. 2012) 1 THE SG2-00725987,version1-16Oct2012 Author manuscript, published in "Solar Energy 88, 10 (2012) Pages 3072-3083" DOI : 10.1016/j.solener.2012.07.018 #12;Submitted to Solar Energy (Nov. 2011) Complete article

364

Submitted for publication in IEEE Design and Test of Computers. This work has been submitted to the IEEE for possible publication. Copyright may  

E-Print Network (OSTI)

type declaration are visible outside the protected type. If a protected type is declared in a package declaration, the protected type body must be declared in the corresponding package body. In other cases a protected type declaration for the instrumentation data structure. The protected type includes methods

Wilsey, Philip A.

365

Carbon dating impacts non-proliferation, drug research and climate...  

NLE Websites -- All DOE Office Websites (Extended Search)

25 years of carbon dating. Carbon dating impacts non-proliferation, drug research and climate change Anne M Stark, LLNL, (925) 422-9799, stark8@llnl.gov Lawrence Livermore...

366

Property:ASHRAE 169 End Date | Open Energy Information  

Open Energy Info (EERE)

property of type Date. Retrieved from "http:en.openei.orgwindex.php?titleProperty:ASHRAE169EndDate&oldid21585" What links here Related changes Special pages Printable...

367

Property:GBIG/ObservationEndDate | Open Energy Information  

Open Energy Info (EERE)

ObservationEndDate Jump to: navigation, search This is a property of type String. Retrieved from "http:en.openei.orgwindex.php?titleProperty:GBIGObservationEndDate&oldid5093...

368

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

369

How to Submit a Privacy Act Request | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

How to Submit a Privacy Act Request How to Submit a Privacy Act Request Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Compilation of Systems of Records Energy Employees Occupational Illness Compensation Program Act (EEOICPA) How to Submit a Privacy Act Request Privacy Act Request Form .pdf file (99KB) Reference Links Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Privacy Act How to Submit a Privacy Act Request Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Privacy Act Request Form .pdf file (99KB) You may request your own Privacy Act records by submitting a request in

370

EIS-0396: Notice of Extension of Time to Submit Scoping Comments |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Time to Submit Scoping Comments Extension of Time to Submit Scoping Comments EIS-0396: Notice of Extension of Time to Submit Scoping Comments Global Nuclear Energy Partnership In response to public requests, the Department of Energy (DOE) announces an extension of time to submit comments on the proposed scope, alternatives, and environmental issues to be analyzed in the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership (GNEP PEIS). Notice of Extension of Time to Submit Scoping Comments on the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership, DOE/EIS-0396 (April 2007) 72 FR 15871 More Documents & Publications EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis

371

Another test for notifications | OpenEI Community  

Open Energy Info (EERE)

Another test for notifications Home > Groups > Databus Notify me Submitted by Prusso on 26 June, 2013 - 10:05 2 answers Points: 0 yeah, I received it just fine. Deanhiller on 2...

372

Another test for notifications | OpenEI Community  

Open Energy Info (EERE)

Another test for notifications Home > Groups > Databus Notify me Submitted by Prusso on 26 June, 2013 - 11:05 2 answers Points: 0 yeah, I received it just fine. Deanhiller on 2...

373

HEV Fleet Testing Maintenance Sheet  

NLE Websites -- All DOE Office Websites (Extended Search)

U520038836 Advanced Vehicle Testing Activity Date Mileage Description Cost 8-Aug 11,142 Oil change 35.44 11-Oct 14,133 Rear Bumper damaged in collision (not included in...

374

Written date: January 19, 2012 Preliminary study on the mechanical behaviour of heat exchanger pile  

E-Print Network (OSTI)

Written date: January 19, 2012 Preliminary study on the mechanical behaviour of heat exchanger pile of Figures: 6 Abstract: The effects of temperature changes on the mechanical behaviour of heat exchanger cycles. 2 Key words: Model tests, heat exchanger pile, settlement, soil/structure interaction

375

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 -0 2 AD 3 04-avr MAC  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 59 0 4 - 0 2 AD 3 04-avr Date Enseignant AKIN Tuna 34 12-avr DT 69 02-mai RL EL QOTBI Noemie 51 11-avr AD 41 30-avr DT FATMI

Douai, Antoine

376

Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 28 5 dc. CC 4 3 18 dc. DT  

E-Print Network (OSTI)

Page 1 Page 1 Intitule Date Enseignant Intitule Date Enseignant AKIN Tuna 28 5 déc. CC 4 3 18 déc Nabil 9 17 déc. SJ 4 0 14 déc. DT Intitule Date Enseignant AKIN Tuna 22 20 déc. PJ EL QOTBI Noemie 63 6

Douai, Antoine

377

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

378

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

379

HiR Thermal Testing Results  

NLE Websites -- All DOE Office Websites (Extended Search)

1 (specimen 22 data from Test 19) position specimen specimen description (test conditions: cold side -18C, warm side 21C) date + time 100 mm from head TC center of glass TC...

380

Follow-Up: RE: test - CECM  

E-Print Network (OSTI)

Follow-Up. Subject: RE: test [ Was: test] Author: abc (abc@yahoo.com) Date: Monday, October 01 at 10:05 PM PDT. Follow-Up Text is: abc. Original Annotation...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Testing for Bacteria  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing for Bacteria Testing for Bacteria Name: Danielle Location: N/A Country: N/A Date: N/A Question: I have to do a science fair project. What I need to compare the relative bacterial levels in milk samples with different expiration dates. What can I use to test the bacteria? Please help! Replies: You want to see if there are bacteria present in milk of different expiration dates, and if so, what they do to the milk. So buy milk of different dates. You could test what effect storage temperature has on bacterial growth in milk. Use those different milk samples in their original package (don't open it!) and keep them at 37 degrees C, at room temperature, and in the fridge (measure how cold that is) for say 48 hrs.Then open the bottle or pack and see what happened to the milk. Do you see differences? Can you explain them? If you open the milk before the experiment you may get bacteria into the milk that otherwise would not have been there. The experiment with the closed bottles will tell you what is better, storage of milk at room temperature, warm, or cold.

382

Preparing to Submit a License Application for Yucca Mountain  

Science Conference Proceedings (OSTI)

In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region of the United States, approximately 100 miles (160 kilometers) northwest of Las Vegas (Figure 1). The location is remote from population centers, and there are no permanent residents within approximately 14 miles (23 km) of the site. Overall, Nye County has a population density of about two persons per square mile (two persons per 2.5 square km); in the vicinity of Yucca Mountain, it is significantly less. Yucca Mountain is a series of north-south-trending ridges extending approximately 25 miles (40 km), and consists of successive layers of fine-grained volcanic tuffs, millions of years old, underlain by older carbonate rocks. The alternating layers of welded and nonwelded volcanic tuffs have differing hydrologic properties that significantly impact the manner in which water moves through the mountain. The repository horizon will be in welded tuff located in the unsaturated zone, more than 1,000 feet (300 meters) above the water table in the present-day climate, and is expected to remain well above the water table during wetter future climate conditions. Future meteorology and climatology at Yucca Mountain are important elements in understanding the amount of water available to potentially interact with the waste.

W.J. Arthur; M.D. Voegele

2005-03-14T23:59:59.000Z

383

Kansas City Plant submits productivity savings under share-in-savings  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas City Plant submits productivity savings under share-in-savings Kansas City Plant submits productivity savings under share-in-savings program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Kansas City Plant submits productivity savings under ... Kansas City Plant submits productivity savings under share-in-savings program Posted By Gayle Fisher

384

Department of Energy Submits $23.6 Billion Spending Plan to Congress for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Submits $23.6 Billion Spending Plan to Department of Energy Submits $23.6 Billion Spending Plan to Congress for FY'07 Department of Energy Submits $23.6 Billion Spending Plan to Congress for FY'07 March 16, 2007 - 10:55am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) today submitted the Department's $23.598 billion spending plan to Congress for Fiscal Year (FY) 2007, a $45 million (0.2%) increase over the FY'07 request, as a result of the FY'07 Continuing Resolution. The spending plan will allow DOE to continue making marked progress in achieving President Bush's goal of bringing more clean energy sources to market to help cut dependence on fossil fuels, increasing our energy and economic security and boosting competitiveness. The Continuing Resolution, signed by President Bush on

385

Preparing and Submitting a Phase I Letter of Intent | U.S. DOE Office of  

Office of Science (SC) Website

and Submitting a Phase I Letter of Intent and Submitting a Phase I Letter of Intent Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR/STTR Home About Funding Opportunity Announcements (FOAs) Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent Preparing a DOE SBIR/STTR Phase I Grant Application Useful Documents for Awardees Commercialization Assistance Other Resources Awards SBIR/STTR Highlights Reporting Fraud Contact Information Small Business Innovation Research and Small Business Technology Transfer U.S. Department of Energy SC-29/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-5707 F: (301) 903-5488 E: sbir-sttr@science.doe.gov More Information » Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent

386

Attachment to Policy Flash on New Procedures for Submitting Clause or Template Changes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on New Procedures for Submitting Clause or Template on New Procedures for Submitting Clause or Template Changes The following are the new procedures for submitting requests to add new clauses or templates or to change existing clauses and templates (including local clauses and templates) in STRIPES: Note that we are not specifying a specific number of days for any step in the process until we have some statistics on how long this new process will take. ∗ Site Points of Contact (SPOCs) and Contract and Financial Assistance Policy Division (CFAPD) staff are the only individuals who can submit a request for a clause or template addition or revision to the STRIPES functional team. Requests from other than the SPOCs will not be reviewed. ∗ The new forms developed for the requests for clause and template additions or revisions

387

How to Submit a FOIA Request | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

How to Submit a FOIA Request How to Submit a FOIA Request Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request FOIA Request Form Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) How to Submit a FOIA Request Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Electronic FOIA Request Form Office of Science Integrated Support Center (ISC)

388

Medical Information Technology trative skills of scheduling appointments, interacting with patients, submitting patient insurance claims using  

E-Print Network (OSTI)

Medical Information Technology - - trative skills of scheduling appointments, interacting with patients, submitting patient insurance claims using current coding procedures, and maintaining medical Description: Medical Information Technology Associate of Applied Science Medical Administrative Assisting

Crone, Elizabeth

389

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

390

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

391

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

392

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

393

Interannual variability of summer monsoon rainfall onset date across India  

E-Print Network (OSTI)

Variability of Indian summer monsoon onset dates is investigated at 1-degree spatial resolution by applying an agronomic definition (i.e. the first significant rains without a potentially damaging dry spell thereafter) to gridded observed daily rainfall data (19512003). Median onset dates compare well with previous estimates. The inter-quartile range varies from less than two weeks over the monsoon zone and western Ghats, to about a month over the northwestern desert. Local onset date is shown to be poorly correlated with regional-scale definitions of monsoon onset, and this is attributed to low estimates of spatial coherence, found for local onset-date variability. There is a weak relationship between local onset date and the JuneSeptember seasonal rainfall total, while the latter is shown to be more spatially coherentand thus more potential predictableover the monsoon zone than local onset date. 1.

Vincent Moron; Andrew W. Robertson

2009-01-01T23:59:59.000Z

394

CERTS Microgrid Laboratory Test Bed  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitted to IEEE Transactions on Power Delivery Submitted to IEEE Transactions on Power Delivery Abstract--. CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a "microgrid". The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations,

395

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

396

Abstract: Keep Your `Steam Tables' up to Date  

Science Conference Proceedings (OSTI)

Keep Your `Steam Tables' up to Date. Allan H. Harvey and William T. Parry. Chem. Eng. Prog., 95(11), 45-49 (Nov. 1999). ...

397

WAPA Tribal Webinar Series - topics and dates | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Webinar: Lessons From Iowa: The Economic, Market, and Organizational Issues in Making Bulk Energy Storage Work - February 9, 2012 (new date) NIST Green Button Presentation...

398

Revised 2-14-2013 Date ____/_____/___ Participant Number ________________________  

E-Print Network (OSTI)

________________________________________ Age _________ Height ___________ Weight __________ Last name First name Middle initial Date of Birth ____________________________________________ Telephone (home) (_____) _____-________ City ____________________________________________ Telephone (work-ray _________________________ _____/_____/_____ ____________________________ Ultrasound _________________________ _____/_____/_____ ____________________________ Nuclear Medicine

399

EV Project Overview Report - Project to Date through December...  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

400

EV Project Overview Report - Project to Date through September...  

NLE Websites -- All DOE Office Websites (Extended Search)

September 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EV Project Overview Report - Project to Date through June 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

June 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

402

PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies...  

NLE Websites -- All DOE Office Websites (Extended Search)

MBG Auditorium PLEASE NOTE THURSDAY DATE - COLLOQUIUM: Professor Ralph Roskies - "Big Data at the Pittsburgh Supercomputing Center" Professor Ralph Roskies Pittsburgh...

403

Groundwater Age-Dating for Water Resource Characterization  

The LLNL Groundwater Noble Gas Mass Spectrometry Facility and Capability offers: Less model-dependent than tritium age dating: Traditional tritium age ...

404

This form may be submitted to the EIA by mail, fax, e-mail, or secure file trans  

U.S. Energy Information Administration (EIA) Indexed Site

5.5 or later or Netscape 4.77 or later. Send your surveys using this secure method at: https://signon.eia.doe.gov/upload/noticeoog.jsp" 5.5 or later or Netscape 4.77 or later. Send your surveys using this secure method at: https://signon.eia.doe.gov/upload/noticeoog.jsp" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"OMB No. 1905-0174" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Expiration Date: 12/31/2015" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Version No.: 2013.01" "FORM EIA-782A" "REFINERS'/GAS PLANT OPERATORS' MONTHLY PETROLEUM PRODUCT SALES REPORT" "This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. See Instructions for further details on the sanctions and the provisions concerning the confidentiality of information submitted on this form."

405

Up-dated opacities from the Opacity Project  

E-Print Network (OSTI)

Using the code AUTOSTRUCTURE, extensive calculations of inner-shell atomic data have been made for the chemical elements He, C, N, O, Ne, Na, Mg, Al, Si, S, Ar, Ca, Cr, Mn, Fe and Ni. The results are used to obtain up-dated opacities from the Opacity Project, OP. A number of other improvements on earlier work have also been included. Rosseland-mean opacities from OP are compared with those from OPAL. Differences of 5 to 10% occur. OP gives the `Z-bump', at log(T)=5.2, to be shifted to slightly higher temperatures. The opacities from OP, as functions of temperature and density, are smoother than those from OPAL. Extensive tests show that the numerical accuracy of the OP opacities following integration over frequency mesh and interpolation on temperature-density mesh is better than 1%. Prior to a number of recent investigations which have indicated a need for a downward revision in the solar abundances of oxygen and other elements, there was good agreement between properties of the sun deduced from helioseismol...

Badnell, N R; Butler, K; Delahaye, F; Mendoza, C I; Palmeri, P; Zeippen, C J; Seaton, M J

2004-01-01T23:59:59.000Z

406

NEMA Lighting, CCE Overview and Update presentation, dated 05/25/2011.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lighting Lighting CCE Overview and Update May 25, 2011 1 2 3 4 5 6 Agenda Certified Ratings Definitions Certification Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory) for * May elect to use a third-party (e.g., certified laboratory) for testing and certification purposes. * Must determine certified ratings through testing.

407

EXPERIMENTAL TESTS OF DEREGULATED MARKETS FOR ELECTRIC POWER: MARKET POWER AND SELF COMMITMENT  

E-Print Network (OSTI)

, there is no obligation in a competitive market to submit accurate information. An offer to sell real energy may competitive market would make it difficult to raise profits by submitting false information. AchievingEXPERIMENTAL TESTS OF DEREGULATED MARKETS FOR ELECTRIC POWER: MARKET POWER AND SELF COMMITMENT 1

408

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

409

Detection and Analysis of Threats to the Energy Sector: DATES  

Science Conference Proceedings (OSTI)

This report summarizes Detection and Analysis of Threats to the Energy Sector (DATES), a project sponsored by the United States Department of Energy and performed by a team led by SRI International, with collaboration from Sandia National Laboratories, ArcSight, Inc., and Invensys Process Systems. DATES sought to advance the state of the practice in intrusion detection and situational awareness with respect to cyber attacks in energy systems. This was achieved through adaptation of detection algorithms for process systems as well as development of novel anomaly detection techniques suited for such systems into a detection suite. These detection components, together with third-party commercial security systems, were interfaced with the commercial Security Information Event Management (SIEM) solution from ArcSight. The efficacy of the integrated solution was demonstrated on two testbeds, one based on a Distributed Control System (DCS) from Invensys, and the other based on the Virtual Control System Environment (VCSE) from Sandia. These achievements advance the DOE Cybersecurity Roadmap [DOE2006] goals in the area of security monitoring. The project ran from October 2007 until March 2010, with the final six months focused on experimentation. In the validation phase, team members from SRI and Sandia coupled the two test environments and carried out a number of distributed and cross-site attacks against various points in one or both testbeds. Alert messages from the distributed, heterogeneous detection components were correlated using the ArcSight SIEM platform, providing within-site and cross-site views of the attacks. In particular, the team demonstrated detection and visualization of network zone traversal and denial-of-service attacks. These capabilities were presented to the DistribuTech Conference and Exhibition in March 2010. The project was hampered by interruption of funding due to continuing resolution issues and agreement on cost share for four months in 2008. This resulted in delays in finalizing agreements with commercial partners, and in particular the Invensys testbed was not installed until December 2008 (as opposed to the March 2008 plan). The project resulted in a number of conference presentations and publications, and was well received when presented at industry forums. In spite of some interest on the part of the utility sector, we were unfortunately not able to engage a utility for a full-scale pilot deployment.

Alfonso Valdes

2010-03-31T23:59:59.000Z

410

ESS 2012 Peer Review - Energy Storage Test Pad - David Rose,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Storage Test Pad Date 09282012 Name David Rose The author gratefully acknowledges the support of Dr. Imre Gyuk and the Department of Energy's Office of Electricity...

411

Summary of potassium/argon age dating, 1979  

DOE Green Energy (OSTI)

During FY-79 the K/Ar dating laboratory at the Department of Geology and Geophysics of the University of Utah became operational. During the past calendar year forty-seven dates have been produced from areas predominantly in Utah. Dating has also been done on areas in Nevada and Montana through the State-Coupled program and Case Studies Support program. Areas in wich activity was concentrated include: Cove Creek Domes/Twin Peaks Area, SW Utah. Here volcanic activity spanned the time from 2.74 to 2.35 M.Y., with a mean age of 2.50 +- 0.14 M.Y. Black Rock Desert, SW Utah. Two dates on a single flow indicate an age of 1.49 +- 0.08 M.Y. for a flow previously undated. Wildcat Creek Area, SW Utah. Dating of rhyolite flows from this area gives a mean age of volcanism of 9.25 +- 0.16 M.Y., considerably older than previously inferred by the work of Haugh (1978). Mineral Mountains Pluton, SW Utah. Twelve dates on phases of the pluton indicate a complex history of intrusion, and more work is indicated in order to derive a coherent picture of the magmatic events leading to the formation of this batholith. Blackfoot Reservoir, Idaho. Two dates on rhyolite domes, previously updated, give ages of 1.56 +- 0.06 M.Y. and 1.28 +- 0.15 M.Y.

Evans, S.H. Jr.

1980-02-01T23:59:59.000Z

412

Flow Test At Snake River Plain Region (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Flow Test At Snake River Plain Region (DOE GTP) Exploration Activity Details Location Snake River Plain Geothermal Region Exploration Technique Flow Test Activity Date Usefulness...

413

Flow Test At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

414

Flow Test At Glass Buttes Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Glass Buttes Area (DOE GTP) Exploration Activity Details Location Glass Buttes Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

415

Flow Test At The Needles Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At The Needles Area (DOE GTP) Exploration Activity Details Location The Needles Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

416

Flow Test At Mccoy Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated...

417

Flow Test At Gabbs Valley Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Gabbs Valley Area (DOE GTP) Exploration Activity Details Location Gabbs Valley Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

418

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

419

Suggested Format for Submitting Frequency Data Requests to the Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Suggested Format for Submitting Frequency Data Requests to the Department of Energy Suggested Format for Submitting Frequency Data Requests to the Department of Energy This document provides a suggested format for 1710 - 1755 MHz wireless industry licensees to submit their data requests to the Department of Energy (DOE). Wireless licensees may use alternate formats, but should ensure that they indicate which DOE frequency assignments are being addressed by identifying the National Telecommunications and Information Administration (NTIA) Government Master File (GMS) Agency Serial Number. This is a unique identifier for each frequency assignment and will be in the format "DOE xxxxxx" where the "x's" will be numbers. XYZ Wireless Company requests the release of technical performance data related to the

420

Submitting the Report Deliverable via E-Link | Scientific and Technical  

Office of Scientific and Technical Information (OSTI)

Basics » DOE Reporting Requirements Basics » DOE Reporting Requirements Submitting the Report Deliverable via E-Link Print page Print page Email page Email page DOE Financial Assistance Recipients and Non-Major Site/Facility Management Contractor should use the AN 241.3 to submit scientific/technical reports electronically. No username or password is needed to submit the AN 241.3 or report deliverable. DOE awardees complete the web form AN 241.3 with just a few required pieces of information as indicated on the form in red font preceded by an asterisk. Instructions are linked at the top of the AN 241.3 and also at the data field level for each field. Set the browser to accept all cookies before starting the submission process. Be sure to input the DOE contract number accurately. Do not enter

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC November 28, 2007 - 4:45pm Addthis RICHMOND, VA - The U.S. Department of Energy (DOE) Assistant Secretary for Nuclear Energy Dennis Spurgeon today commended Dominion North Anna, LLC (Dominion) for submission of a combined Construction and Operating License (COL) application to the Nuclear Regulatory Commission (NRC) for construction of a new nuclear power plant in the United States. Dominion's application seeks approval to build and operate one General Electric-Hitachi Economic Simplified Boiling Water Reactor (ESBWR) at its

422

ARM - Procedure for Submitting Science and Research Products to the Data  

NLE Websites -- All DOE Office Websites (Extended Search)

DocumentationProcedure for Submitting Science and Research DocumentationProcedure for Submitting Science and Research Products to the Data Archive Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Procedure for Submitting Science and Research Products to the Data Archive The Principal Investigator (PI) establishes contact with an ARM Translator to describe the data product. The Translator collects enough information to describe the PI Product within the Translator group; thereby resulting in assignment of the

423

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

424

How to Submit a Request for a PARS II Account | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account The account access process for PARS II relies on the Department of Energy's MIS Application Gateway system to verify the requestor's identity and to approve his/her request for access to a specific DOE Headquarters application, such as PARS II. Once approved by the MIS Application Gateway, the PARS II Help Desk Administrator will assign a new PARS II account to the requestor. Please follow the steps listed below to apply for a PARS II account. 1. If the federal employee or contractor does not already have an account with the Department of Energy's MIS Application Gateway, then the requestor must apply for an account and be approved by a local federal sponsor. To

425

Up-dated opacities from the Opacity Project  

E-Print Network (OSTI)

Using the code AUTOSTRUCTURE, extensive calculations of inner-shell atomic data have been made for the chemical elements He, C, N, O, Ne, Na, Mg, Al, Si, S, Ar, Ca, Cr, Mn, Fe and Ni. The results are used to obtain up-dated opacities from the Opacity Project, OP. A number of other improvements on earlier work have also been included. Rosseland-mean opacities from OP are compared with those from OPAL. Differences of 5 to 10% occur. OP gives the `Z-bump', at log(T)=5.2, to be shifted to slightly higher temperatures. The opacities from OP, as functions of temperature and density, are smoother than those from OPAL. Extensive tests show that the numerical accuracy of the OP opacities following integration over frequency mesh and interpolation on temperature-density mesh is better than 1%. Prior to a number of recent investigations which have indicated a need for a downward revision in the solar abundances of oxygen and other elements, there was good agreement between properties of the sun deduced from helioseismology and from stellar evolution models calculated using OPAL opacities. The revisions in abundances destroy that agreement. In a recent paper Bahcall et al argue that the agreement would be restored if opacities for the regions of the sun between 0.7 and 0.4 solar radii were larger than those given by OPAL by about 10%. In the region concerned, the present results from OP do not differ from those of OPAL by more than 2.5%.

N. R. Badnell; M. A. Bautista; K. Butler; F. Delahaye; C. Mendoza; P. Palmeri; C. J. Zeippen; M. J. Seaton

2004-10-29T23:59:59.000Z

426

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Science Undergraduate Laboratory Internships (SULI) SULI Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. SULI Internship Term: Spring 2014 Summer 2014* Fall 2013 On-line Application Opens August 6, 2013 October 18, 2013 May 1, 2013 Applications Due October, 1, 2013 5:00 PM ET January 10, 2014 5:00 PM ET June 12, 2013 5:00 PM ET Offer Notification Period Begins on or around October, 15, 2013 January 20, 2014 June 24, 2013

427

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81: Categorical Exclusion Determination 81: Categorical Exclusion Determination Solar Instructor Training Network - Midwest Provider CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Wisconsin Offices(s): Golden Field Office January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 27, 2012 CX-007879: Categorical Exclusion Determination Wasatch SunShot Streamlining and Simplifying Solar CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Utah Offices(s): Golden Field Office January 27, 2012 CX-007878: Categorical Exclusion Determination Texas Solar Collaboration to Streamline and Enable An Increase in Photovoltaic Capacity CX(s) Applied: A9, A11 Date: 01/27/2012

428

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2013 3, 2013 CX-010294: Categorical Exclusion Determination Building For Re-Roofing Project CX(s) Applied: B1.23, B2.1, B2.5 Date: 05/03/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010292: Categorical Exclusion Determination Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010291: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010289: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas

429

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-009047: Categorical Exclusion Determination New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009046: Categorical Exclusion Determination Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009007: Categorical Exclusion Determination Northeast Provider of Solar Photovoltaic Instructor Training CX(s) Applied: A9, A11, B5.16 Date: 08/08/2012 Location(s): New York Offices(s): Golden Field Office August 8, 2012 CX-009045: Categorical Exclusion Determination Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

430

Save Energy, Save Date Night | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy, Save Date Night Energy, Save Date Night Save Energy, Save Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy How can I participate? Follow these tips to save energy and money this Valentine's Day. Valentine's Day. For many couples, it means cards, flowers, and prix fixe candlelight dinners. It also means for many couples a hefty withdrawal at the ATM to express their love. Fortunately, there are ways to save money by saving energy - even during the date - so you can spend the money you save on the things that really matter to your sweetheart. Here are five easy tips for those couples out there who want to save energy, save

431

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-003179: Categorical Exclusion Determination Mentasta Traditional Council CX(s) Applied: A9, A11 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003178: Categorical Exclusion Determination Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003169: Categorical Exclusion Determination Mecklenburg County Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010 Location(s): Mecklenburg County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003167: Categorical Exclusion Determination South Boston Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010

432

Save Energy, Save Date Night | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu...

433

DOE Guidance-Setting Effective Date for New Hires  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this memorandum is to establish the Department of Energy's (DOE) policy for setting effective dates for newly hired employees and to ensure uniform application among DOE Headquarters...

434

MEMORANDUM TO: FILE DATE FROM: SUBJECT: I ALTERNATE NAME:  

Office of Legacy Management (LM)

yes, date contacted TYPE OF OPERATIkN ----------- 0 Research & Development' 0 Facility Type 0 Production scale tastinq Cl PiL'at Scale a Bench Scale Process a Theoretical...

435

Contaminant Dating and Natural Recovery with Radioisotopes in Sediment  

Science Conference Proceedings (OSTI)

There are many reasons to conduct dated sediment core investigations. These include the site-specific analysis of sediment accumulation rates, natural and modern contaminant background concentrations, storm water effects, sediment stability, natural recovery, source identification, and recontamination potential. Environmental investigators use a limited number of radioisotopes for sediment dating, including 1) beryllium-7 for sediment deposition during the last year, 2) lead-210 and cesium-137 for sedime...

2011-12-21T23:59:59.000Z

436

/sup 137/Cs radioactive dating of Lake Ontario sediment cores  

SciTech Connect

The distribution of /sup 137/Cs in sediment cores from Lake Ontario provides estimates of the sediment accumulation rates. Geochronology with /sup 210/Pb dating and distribution of Ambrosia (ragweed) pollen compare well with /sup 137/Cs dating. These methods can determine with precision, changes in sedimentation occurring over the past 100 years or so. Typical sedimentation rates of 0.18-0.36 cm/yr were measured. 16 refs., 3 figs., 2 tabs.

Ward, T.E.; Breeden, J.; Komisarcik, K.; Porter, R.; Czuczwa, J.; Kaminski, R.; McVeety, B.D.

1987-12-01T23:59:59.000Z

437

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

438

Property:NEPA ApplicationDate | Open Energy Information  

Open Energy Info (EERE)

ApplicationDate ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate" Showing 25 pages using this property. (previous 25) (next 25) C CA-670-2010-107 + 17 December 2008 + D DOI-BLM-CA-ES-2013-002+1793-EIS + 17 February 2010 + DOI-BLM-ID-110-2009-3825-CE + 4 June 2009 + DOI-BLM-ID-220-2009-EA-3709 + 12 February 2009 + DOI-BLM-ID-I020-2012-0017-CX + 21 October 2011 + DOI-BLM-NM-L000-2012-0046-CX + 4 January 2012 + DOI-BLM-NV-B020-2008-0071-DNA + 21 February 2008 + DOI-BLM-NV-B020-2008-????-?? + 11 April 2008 + DOI-BLM-NV-B020-2008-????-CX + 29 September 2008 + DOI-BLM-NV-B020-2009-0030-CX + 11 December 2008 + DOI-BLM-NV-B020-2010-0106-CX + 15 December 2009 +

439

Property:NEPA DecisionDocumentDate | Open Energy Information  

Open Energy Info (EERE)

DecisionDocumentDate DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the following 1 subproperty: D DOI-BLM-UT-W019-2011-0006-CX Pages using the property "NEPA DecisionDocumentDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 18 December 2007 + C CA-170-02-15 + 21 February 2002 + CA-650-2005-086 + 3 June 2006 + CA-670-2010-107 + 26 May 2010 + CA-670-2010-CX + 27 January 2010 + CA-96062042 + 31 May 2000 + D DOE-EA-1621 + 23 September 2008 + DOE-EA-1676 + 2 December 2009 + DOE-EA-1733 + 21 June 2010 + DOE-EA-1759 + 28 May 2010 + DOE-EA-1849 + 22 August 2011 + DOI-BLM-CA-C050-2009-0005-EA + 11 September 2009 +

440

Property:NEPA RevisedApplicationDate | Open Energy Information  

Open Energy Info (EERE)

RevisedApplicationDate RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA RevisedApplicationDate" Showing 19 pages using this property. D DOI-BLM-CA-ES-2013-002+1793-EIS + 5 June 2012 + DOI-BLM-NV-C010-2010-0006-EA + 16 November 2009 + DOI-BLM-NV-C010-2010-0010-EA + 15 October 2009 + DOI-BLM-NV-C010-2011-0016-EA + 15 March 2011 + DOI-BLM-NV-C010-2012-0050-EA + 14 February 2012 + DOI-BLM-NV-C010-2012-0051-EA + 1 December 2011 + DOI-BLM-NV-C010-2012-0069-CX + 9 August 2012 + DOI-BLM-NV-C010-2012-0070-CX + 27 July 2012 + DOI-BLM-NV-E030-2011-0017-CX + 2 March 2011 + DOI-BLM-NV-W010-2010-0004-EA + 23 November 2009 + DOI-BLM-NV-W010-2011-0001-EA + 4 June 2010 +

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Announced United States nuclear tests, July 1945--December 1990  

SciTech Connect

This document lists chronologically and alphabetically by event name all nuclear tests conducted and announced by the United States from July 1945 to December 1990 with the exception of the GMX experiments. Discussion is included on test dates, test series, test yields, test locations, test types and purposes, test totals for Nevada Test Site (NTS) detection of radioactivity from NTS events, and categorization of NTS nuclear tests. Briefly discussed are agreements between the US and the Soviet Union regarding test banning. (MB)

Not Available

1991-01-01T23:59:59.000Z

442

CEA … External Power Supplies, CCE Overview and Update presentation, dated June 28, 2011.  

NLE Websites -- All DOE Office Websites (Extended Search)

CEA - External Power CEA - External Power Supplies CCE Overview and Update June 28, 2011 1 2 3 4 5 6 Agenda Certified Ratings Basic Models and Design Families Manufacturer and Importer Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory or * May elect to use a third-party (e.g., certified laboratory or foreign OEM) for testing and certification submission.

443

NIST HANDBOOK 150-17 ANNEX D CHECKLIST (REV. 2012-04-05) PAGE 1 OF 4 Enter Date: Enter NVLAP Lab Code  

E-Print Network (OSTI)

NIST HANDBOOK 150-17 ANNEX D CHECKLIST (REV. 2012-04-05) PAGE 1 OF 4 Enter Date: Enter NVLAP Lab Code: NIST HANDBOOK 150-17 Annex D CHECKLIST General Services Administration Precursor (GSAP) Testing Handbook 150-17, Cryptographic and Security Testing, for the General Services Administration Precursor test

Magee, Joseph W.

444

Instructions for Submitting Document to OpenNet | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Instructions for Submitting Document to OpenNet Instructions for Submitting Document to OpenNet Instructions for Submitting Document to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't already have one, go to the OpenNet web site at: http://www.osti.gov/opennet. Click on the LOGIN link on the top right. Read the information and check the "I agree..." box. Click on the "Request data submission access..." link at the bottom of the page. Fill out the form. One of the required fields is the Site Input Code field. This field provides a drop down list of DOE Sites. All users with the same Site Input Code can edit all the records for that site. If your Site Code is not in the list or you need a site code more specific to your office than those

445

Scientometric analysis of papers submitted to the third international nanotechnology forum (Moscow, 2010)  

Science Conference Proceedings (OSTI)

This is a brief information and analytical survey of the papers that were submitted to the Third International Nanotechnology Forum that was held in Moscow on November 1---3, 2010. Scientometric data on the participants, their origins by region and research ... Keywords: Nanotechnology Forum, Nobel Prize winners, RUSNANO, education, graphene, nanomaterials, nanoobjects, nanophysics, nanostructure, scientometrics

N. M. Builova; A. I. Osipov

2011-02-01T23:59:59.000Z

446

Oil Independence: Achievable National Goal or Empty Slogan? Submitted May 25, 2007  

E-Print Network (OSTI)

07--1693 Oil Independence: Achievable National Goal or Empty Slogan? Submitted May 25, 2007 Word-488-2413; email: singhm@anl.gov #12;Greene, Leiby, Patterson, Plotkin and Singh 1 ABSTRACT Oil independence has. A rigorous, measurable definition is proposed: to reduce the costs of oil dependence to less than 1% of GDP

447

Computational Modeling and the Experimental Plasma Research Program A White Paper Submitted to the FESAC Subcommittee  

E-Print Network (OSTI)

Computational Modeling and the Experimental Plasma Research Program A White Paper Submitted of the fusion energy program. The experimental plasma research (EPR) program is well positioned to make major in fusion development and promote scientific discovery. Experimental plasma research projects explore

448

Agent Tcl: A exible and secure mobile-agent Submitted to the Faculty  

E-Print Network (OSTI)

Agent Tcl: A exible and secure mobile-agent system A Thesis Submitted to the Faculty in partial ful malicious machines), and insulating the agent against network and machine failures. Agent Tcl is a mobile-agent system under development at Dartmouth College that has evolved from a Tcl-only system into a multiple

449

Agent Tcl: A flexible and secure mobileagent Submitted to the Faculty  

E-Print Network (OSTI)

Agent Tcl: A flexible and secure mobile­agent system A Thesis Submitted to the Faculty in partial malicious machines), and insulating the agent against network and machine failures. Agent Tcl is a mobile­agent system under development at Dartmouth College that has evolved from a Tcl­only system into a multiple

450

SOM ARRA Grant Activity Proposals Submitted as of 7-15-2010 Project Costs*  

E-Print Network (OSTI)

SOM ARRA Grant Activity Proposals Submitted as of 7-15-2010 Project Costs* Total # of Proposals 1,264 Total Project Costs $1,093,036,719 Total Direct Costs $803,739,425 Total Indirects $290,408,131 Awards Received as of 2-11-2011 Project Costs* Year 1 Costs Total # of Awards 333 Total Project Costs $186

Bushman, Frederic

451

An introduction to ios programming: from getting the sdk to submitting your first app, 1 edition  

Science Conference Proceedings (OSTI)

Learn the steps necessary for building your first iOS app. With this introductory video course, experienced iOS developer Alasdair Allan walks you through the entire process, from downloading the developer tools to submitting your finished app to Apple's ...

Allan Alasdair

2011-05-01T23:59:59.000Z

452

Submitted 08-13-09: Energy Policy Putting Renewables and Energy Efficiency To Work  

E-Print Network (OSTI)

energy usage due to other effects such as conservation or behavior changes. The supply of low carbon1 Submitted 08-13-09: Energy Policy Putting Renewables and Energy Efficiency To Work: How Many Jobs Can The Clean Energy Industry Generate in the U.S.? Max Wei,* Shana Patadia,** Daniel M. Kammen

Kammen, Daniel M.

453

Scientometric analysis of papers submitted to the second international nanotechnology forum (Moscow, 2009)  

Science Conference Proceedings (OSTI)

This is a brief information and analytical survey of the papers submitted to the Second International Nanotechnology Forum held in Moscow in October 2009. Scientometric data on the participants, their origins by regions and research centers, as well ... Keywords: Nanotechnology Forum, ROSNANO, education, nanomaterials nanometrology, nanoobjects, nanophysics, scientometrics

N. M. Builova; A. I. Osipov

2010-04-01T23:59:59.000Z

454

HiR Thermal Testing Results  

NLE Websites -- All DOE Office Websites (Extended Search)

3 position specimen specimen description (test conditions: cold side -18C, warm side 21C) date + time 100 mm from head TC center of glass TC 100 mm from sill TC upper IR line...

455

HiR Thermal Testing Results  

NLE Websites -- All DOE Office Websites (Extended Search)

1 position specimen specimen description (test conditions: cold side -18C, warm side 21C) date + time 100 mm from head TC center of glass TC 100 mm from sill TC upper IR line...

456

HiR Thermal Testing Results  

NLE Websites -- All DOE Office Websites (Extended Search)

0 position specimen specimen description (test conditions: cold side -18C, warm side 21C) date + time 100 mm from head TC center of glass TC 100 mm from sill TC upper IR line...

457

HiR Thermal Testing Results  

NLE Websites -- All DOE Office Websites (Extended Search)

position specimen specimen description (test conditions: cold side -18C, warm side 21C) date + time 100 mm from head TC center of glass TC 100 mm from sill TC upper IR line...

458

HiR Thermal Testing Results  

NLE Websites -- All DOE Office Websites (Extended Search)

8 position specimen specimen description (test conditions: cold side -18C, warm side 21C) date + time 100 mm from head TC center of glass TC 100 mm from sill TC upper IR line...

459

The Challenge of Testing RFID Integrated Circuits  

Science Conference Proceedings (OSTI)

RFID integrated circuits often involve many of themost leading edge production technologies availabletoday. The complexities involved with integrating thesecomplexities into the backend and test environment areexceptionally challenging. To date, this ...

David Murfett

2004-01-01T23:59:59.000Z

460

I HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S)  

Office of Legacy Management (LM)

HEHORANDIJH HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S) -------- lyaa * ------------------------ currwlt * ~e.Gd. ------------------------ Owner contacted Ja Yes 0 no; if ym, date contact=d--~~~?~~-2--- :TY+E OF OPERATION --------- - ---- Research & Development 0 Facility Type Production scale testing Pi lot Scale Bench Scale Process Theoretical Studies *i Sample & &balysis a Hanuf ??cturing a University 0 Research Organization 0 Sov~rnment Sponsored Facjlity a Other --------------------- I *l IPr~oduction Q Di8poklKtorage ?? rrimo cl Other information (i.e., cost 0 +bcontractor + fixed fem. unit price, ?? Purchase Order time 81 material, ?? tc) , ---------------------------- kontract,Purchame Order # kJ -?!a se -fiti & ~~~-~~~~~~~~~~--=~~-=------~ ----------w--mm -- E!!me~IEJ!L~E~~~~:

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Submitted by:  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by the California Air Resource Board. The statements and conclusions in this report are those of the contractor and not necessarily those of California Air Resources Board. The mention of commercial products, their source, or their use in connection with material reported herein is not to be construed as actual or implied endorsement of such products.

Mr. Bob Okamoto; Dr. Thomas; D. Durbin; Dr. J. Wayne Miller; Ms. S. Michelle Jiang

2010-01-01T23:59:59.000Z

462

Submitted to:  

E-Print Network (OSTI)

felt it would be easier for you to view the color photograph copy, in case this information was relevant to your review. We are asking you to send back the original after you copy it. You can keep the original for at least a month if necessary, and then return it. We are having a copy made for Philip Ramsey at JPG. Please be warned that the Agency has not completed it's review of the document. We have not included the Executive Summary Chapter 1, or Chapter 5 the Recommendations portion, because these are enforcement sensitive at this time. We would be happy to discuss with you or Phil what are recomiendations might be on some of the areas. We are currently working on the review of the USATHEMA Workplan, and will send comments to Phil when they are organized. We also will send you a copy of Region V's Quality Assurance Protocols that must be met for compliance with a RCRA Facility Investigation. I hope the information will be useful to you. If you have any questions regarding this matter, please contact me at (312) 886-6146. or Hak Cho at

Abraham Chen Ph. D; King Ave; Carol Ann Wi Tt-smi Th; Phil Ramsey Jpg

1992-01-01T23:59:59.000Z

463

Submitted by  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. Final Report DE-FC26-06NT42724 The overall objective of the present work was to develop technologies to reduce freshwater consumption in a cooling tower of coal-based power plant so that one could significantly reduce the need of make-up water. The specific goal was to develop a scale

Young I Cho; Er A. Fridman

2009-01-01T23:59:59.000Z

464

Submitting Organizations:  

E-Print Network (OSTI)

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the The objective of the project is to apply a unique ice thermal storage (ITS) technology to cooling the intake air to gas turbines used for power generation. In Phase I, the work includes theoretical analysis, computer simulation, engineering design and cost evaluation of this novel ITS technology. The study includes two typical gas turbines (an industrial and an aeroderivative type gas

Guy Weismantel; Doe Award; No. De-fg-nt

2004-01-01T23:59:59.000Z

465

SUBMITTED BY  

E-Print Network (OSTI)

i TABLE OF CONTENTS Disclaimer.iv Acknowledgement..v Table of abbreviations.vi Table of cases..vii

Dr. Sanjay; Kumar Pandey; Meghna Chandra

2013-01-01T23:59:59.000Z

466

Submitting Comments  

Science Conference Proceedings (OSTI)

... Mr. Public pulls up a copy of the cross sectional view of the battery. He explans the drawbacks of thinner partitions with regard to battery life. ...

467

ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- February 3, 2012 ENERGY STAR® is a joint program of the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) with a dual focus on energy and cost savings. These goals are reached through a combination of increasing customer awareness, partnering with over 15,000 private and public sector organizations and driving widespread technological advances in energy efficiency. ENERGY STAR recognizes three paths to increased daily energy efficiency: bringing to market new energy-efficient products, constructing efficient new homes and commercial buildings, and improving the efficiency of existing homes, commercial buildings and industrial facilities. In 2010, DOE launched a pilot program to verify the energy efficiency and water-use characteristics of

468

Testing optically stimulated luminescence dating of sand-sized quartz and feldspar from uvial deposits  

E-Print Network (OSTI)

and scattering. The emitted beam, usually a red light emitting diode (LED; at 660 nm) passes through a pre

Törnqvist, Torbjörn E.

469

Mixed Stream Test Rig (MISTER) Startup Report  

DOE Green Energy (OSTI)

This report describes the work accomplished to date to design, procure, assemble, authorize, and startup the Mixed Stream Test Rig (MISTER) at the Idaho National Laboratory (INL). It describes the reasons for establishing this capability, physical configuration of the test equipment, operations methodology, initial success, and plans for completing the initial 1,000 hour test.

Charles Park

2011-02-01T23:59:59.000Z

470

Integrated test vehicle program plan: revision C  

DOE Green Energy (OSTI)

This edition dated August 26, 1977, is Revision C of the Integrated Test Vehicle, Program Plan, Phase II - Deliverable Item 2-7-1. The original edition was issued on May 27, 1977. Corrections were made and issued as Proposed Modifications for Integrated Test Vehicle, Program Plan, dated July 8, 1977. For the purpose of documenting changes, the July 8, 1977, version is caled Revision A. The edition dated August 5, 1977, is called Revision B. Each paragraph in this edition is marked to indicate technical changes from previous editions.

Not Available

1977-08-26T23:59:59.000Z

471

When do I need to submit a White Paper, Letter Of Intent or pre-Proposal through DSR?  

E-Print Network (OSTI)

When do I need to submit a White Paper, Letter Of Intent or pre-Proposal through DSR? · Sponsor requires only a white paper/letter of intent. · No budget is being submitted. · No authorized signature. · Sponsor requires white paper/letter of intent be signed by an Authorized Official. · No budget is being

Jawitz, James W.

472

Motor Pool Guidelines for Geosciences A completed Motor Pool Request form must be submitted to Denise for  

E-Print Network (OSTI)

Motor Pool Guidelines for Geosciences · A completed Motor Pool Request form must be submitted on the Geosciences website under the forms link. http://www.geo.arizona.edu/pdf/motor_pool_request.pdf · If the trip be submitted with the Motor Pool Request. · A list of passengers and drivers is for all motor pool travel (this

Holliday, Vance T.

473

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2009 August 5, 2009 CX-000510: Categorical Exclusion Determination Isolation of Domestic and Fire Water Lines, 710-B CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000507: Categorical Exclusion Determination Building. 728-N Cut and Grout Domestic Water and Plant Air Lines CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000508: Categorical Exclusion Determination Electrical Isolation of Building 710-B CX(s) Applied: B4.10 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009

474

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 CX-006533: Categorical Exclusion Determination Installation of Retail Biofuel Fueling Infrastructure CX(s) Applied: A1, B5.1 Date: 08/25/2011 Location(s): Byron, Georgia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 25, 2011 CX-006516: Categorical Exclusion Determination Carolina Blue Skies Initiative CX(s) Applied: A1, B5.1 Date: 08/25/2011 Location(s): Durham, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 25, 2011 CX-006515: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7 Date: 08/25/2011 Location(s): Lincoln, Nebraska Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

475

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 13, 2013 March 13, 2013 CX-010162: Categorical Exclusion Determination Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration March 12, 2013 CX-010558: Categorical Exclusion Determination University of California Santa Cruz- Adiabatic Waveguide Coupler for High-Power Solar Energy Collection, Photovoltaic Conversion and Transmission CX(s) Applied: B3.6 Date: 03/12/2013 Location(s): California, California, California, California, Colorado Offices(s): Advanced Research Projects Agency-Energy March 12, 2013 CX-010132: Categorical Exclusion Determination 235-F Risk Reduction and Deactivation CX(s) Applied: B1.28 Date: 03/12/2013 Location(s): South Carolina

476

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-007736: Categorical Exclusion Determination Rutgers University - First in Class Demonstration of Completely New type of SiC Bipolar Switch (15 kilovolt (kV)-20kV) for Utility Scale Inverters CX(s) Applied: A9, B3.6 Date: 12/08/2011 Location(s): New Jersey Offices(s): Advanced Research Projects Agency-Energy December 7, 2011 CX-007407: Categorical Exclusion Determination Advanced Floating Turbine CX(s) Applied: A9 Date: 12/07/2011 Location(s): Ohio Offices(s): Golden Field Office December 7, 2011 CX-007403: Categorical Exclusion Determination State of New Hampshire Energy Efficiency and Conservation Block Grant CX(s) Applied: B5.19 Date: 12/07/2011 Location(s): New Hampshire Offices(s): Golden Field Office December 7, 2011 CX-007401: Categorical Exclusion Determination

477

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-002796: Categorical Exclusion Determination Clean Cities Transportation Sector Petroleum Reduction Technologies Program CX(s) Applied: B5.1 Date: 06/23/2010 Location(s): Naples, Utah Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 23, 2010 CX-002792: Categorical Exclusion Determination Massachusetts-City-Taunton CX(s) Applied: B1.32, B2.5, A9, A11, B5.1 Date: 06/23/2010 Location(s): Taunton, Massachusetts Office(s): Energy Efficiency and Renewable Energy June 22, 2010 CX-003027: Categorical Exclusion Determination The Replacement of PacifiCorp?s Kennewick ? Dayton Hilltop Microwave Communication Equipment CX(s) Applied: B1.7, B4.6 Date: 06/22/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration

478

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2009 7, 2009 CX-001264: Categorical Exclusion Determination Energy Efficiency Retrofits CX(s) Applied: B2.5, B5.1 Date: 12/17/2009 Location(s): Aroostock, Maine Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001263: Categorical Exclusion Determination Hire a Consultant CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Livingston, Louisiana Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001255: Categorical Exclusion Determination Energy Efficiency (EE) and Conservation, Loan Program, EE Upgrades, and Update Traffic Lights CX(s) Applied: A1, A8, A11, B2.5, B5.1 Date: 12/17/2009 Location(s): Bridgeport, Connecticut Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-001253: Categorical Exclusion Determination

479

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-005598: Categorical Exclusion Determination Demonstration of a Novel Synchrophasor-Based Situational Awareness System CX(s) Applied: A1, A11, B1.7, B3.6 Date: 04/11/2011 Location(s): Chattanooga, Tennessee Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory April 11, 2011 CX-005597: Categorical Exclusion Determination Extraction of Formation Water from Carbon Dioxide Storage CX(s) Applied: A9 Date: 04/11/2011 Location(s): Grand Forks, North Dakota Office(s): Fossil Energy, National Energy Technology Laboratory April 11, 2011 CX-005596: Categorical Exclusion Determination Carolina Blue Skies Initiative CX(s) Applied: A1, B5.1 Date: 04/11/2011 Location(s): Greensboro, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy

480

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8004: Categorical Exclusion Determination 8004: Categorical Exclusion Determination Siting, Construction, Modifying, and Operating Small-Scale Structures CX(s) Applied: B1.15 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office November 28, 2011 CX-007758: Categorical Exclusion Determination Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): Illinois Offices(s): Nuclear Energy, Idaho Operations Office November 28, 2011 CX-007757: Categorical Exclusion Determination Multipurpose Target Chamber for High-Temperature Ion Irradation - University of Tennessee CX(s) Applied: B3.10 Date: 11/28/2011 Location(s): Tennessee Offices(s): Nuclear Energy, Idaho Operations Office

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2013 2, 2013 CX-011107: Categorical Exclusion Determination High Efficiency Thin Film Fe2SiS4 and Fe2GeS4-based Cells Prepared from Low-Cost Solution CX(s) Applied: B3.6 Date: 08/12/2013 Location(s): Delaware Offices(s): Golden Field Office August 12, 2013 CX-010883: Categorical Exclusion Determination PHX-LOB and LIB-LOB 230-Kilovolt Double-Circuit- Replace Insulators at Structure No. 28-2 With NCI Type Polymers CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region August 12, 2013 CX-010802: Categorical Exclusion Determination Building 19 Mezzanine Demolition Project CX(s) Applied: B1.23 Date: 08/12/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory August 12, 2013

482

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-008208: Categorical Exclusion Determination Renewable Energy and Energy Efficiency Revolving Loan Program - Andreola Farms, Incorporated CX(s) Applied: B5.18 Date: 03/27/2012 Location(s): Nevada Offices(s): Golden Field Office March 26, 2012 CX-008164: Categorical Exclusion Determination Captain Jack-Olinda RAS LLL/LT Replacement Project CX(s) Applied: B1.31 Date: 03/26/2012 Location(s): California Offices(s): Bonneville Power Administration March 26, 2012 CX-008207: Categorical Exclusion Determination Field Evaluation and Validation of Remote Wind Sensing Technologies - Shore-Based and Buoy Mounted Light LIDAR Systems CX(s) Applied: A9, A11, B3.1, B3.16 Date: 03/26/2012 Location(s): New Jersey Offices(s): Golden Field Office March 26, 2012 CX-008206: Categorical Exclusion Determination

483

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2009 23, 2009 CX-000204: Categorical Exclusion Determination Manufacturing Industrial Development for the Alternative Energy Systems CX(s) Applied: A9, A11 Date: 11/23/2009 Location(s): Ann Arbor, Michigan Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000203: Categorical Exclusion Determination Health Lab Heat Recovery CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): South Dakota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000202: Categorical Exclusion Determination Energy Efficiency and Renewable Energy in Schools CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 23, 2009 CX-000201: Categorical Exclusion Determination

484

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-003040: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: A1, A7, B5.1 Date: 07/13/2010 Location(s): Pickens, South Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory July 13, 2010 CX-003039: Categorical Exclusion Determination High Temperature Chemical Sensors for Energy Research CX(s) Applied: B3.6 Date: 07/13/2010 Location(s): San Antonio, Texas Office(s): Fossil Energy, National Energy Technology Laboratory July 13, 2010 CX-003038: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7, B5.1 Date: 07/13/2010 Location(s): Omaha, Nebraska Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory July 13, 2010

485

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 6, 2012 CX-009331: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations Phase II CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): New Jersey Offices(s): National Energy Technology Laboratory September 26, 2012 CX-009433: Categorical Exclusion Determination Center for Biomass Utilization Renewal of Grant CX(s) Applied: B3.6 Date: 09/26/2012 Location(s): North Dakota, Minnesota Offices(s): Golden Field Office September 25, 2012 CX-009242: Categorical Exclusion Determination Development of Light Water Reactor Fuels with Enhanced Accident Tolerance - AREVA Federal Services LLC CX(s) Applied: B3.6, B3.15 Date: 09/25/2012 Location(s): Florida, Wisconsin Offices(s): Nuclear Energy September 25, 2012 CX-009241: Categorical Exclusion Determination

486

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2012 19, 2012 CX-009638: Categorical Exclusion Determination Replacement, Removal, and Closure of Underground Storage Tanks CX(s) Applied: B2.5, B6.1 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009637: Categorical Exclusion Determination Removing Items or Materials Containing Polychlorinated Biphenyls CX(s) Applied: B1.17 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009636: Categorical Exclusion Determination Ventilation Activities CX(s) Applied: B1.4, B1.16, B2.1, B2.3 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009544: Categorical Exclusion Determination

487

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-008298: Categorical Exclusion Determination Clean Start - Development of a National Liquid Propane Refueling Network CX(s) Applied: B5.22 Date: 04/27/2012 Location(s): California, Indiana Offices(s): National Energy Technology Laboratory April 27, 2012 CX-008297: Categorical Exclusion Determination Characterization of Most Promising Carbon Capture and Sequestration Formations CX(s) Applied: B3.1 Date: 04/27/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory April 27, 2012 CX-008296: Categorical Exclusion Determination Evaluation of Solid Sorbents as a Retrofit Technology for Carbon Dioxide Capture CX(s) Applied: B3.6 Date: 04/27/2012 Location(s): Alabama Offices(s): National Energy Technology Laboratory April 27, 2012 CX-008295: Categorical Exclusion Determination

488

Argonne CNM News: Thinnest Nanofiltration Membrane to Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Thinnest Nanofiltration Membrane to Date Thinnest Nanofiltration Membrane to Date Thinnest membrane to date Close-packed nanoparticle monolayers self-assembled from dodecanethiol-ligated gold nanocrystals. TEM image (left) and atomistic simulation of tryptophan transport through a pore. A recent collaboration between users at the University of Chicago and the University of Illinois at Chicago with the Center for Nanoscale Material's Electronic & Magnetic Materials & Devices Group has produced the thinnest nanofiltration membrane achieved thus far, at ~30 nm, made of just four layers of nanoparticles. A separation membrane is a key component in both nanofiltration and reverse osmosis filtration systems. Typically they are microns-thick polymer films. Reducing the thickness of the membrane reduces the pressure that needs to

489

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008531: Categorical Exclusion Determination Energize Missouri Homeowners Upgrades and Geothermal Jura CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office May 23, 2012 CX-008530: Categorical Exclusion Determination Energize Missouri Homeowners Upgrades and Geothermal Carlson CX(s) Applied: B5.1, B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office May 23, 2012 CX-008710: Categorical Exclusion Determination Amendment Number 1 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 05/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration May 23, 2012 CX-008743: Categorical Exclusion Determination Upgrading Lanthanide & Actinide Spectroscopy Capabilities at Washington

490

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2010 6, 2010 CX-001968: Categorical Exclusion Determination Development of Energy Efficiency and Conservation Strategy CX(s) Applied: A9, A11, B5.1 Date: 04/26/2010 Location(s): Box Elder County, Utah Office(s): Energy Efficiency and Renewable Energy April 26, 2010 CX-001813: Categorical Exclusion Determination Lean Gasoline System Development for Fuel Efficient Small Cars (Milford) CX(s) Applied: B3.6, A9 Date: 04/26/2010 Location(s): Milford, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 26, 2010 CX-002020: Categorical Exclusion Determination Energy Efficiency Retrofits for Anaconda's Antique Street Lights CX(s) Applied: B2.5, B5.1 Date: 04/26/2010 Location(s): Anaconda, Montana Office(s): Energy Efficiency and Renewable Energy

491

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 4, 2012 June 4, 2012 CX-008633: Categorical Exclusion Determination Dismantlement and Removal of 321-M Solvent Storage Tank Area Dynamic Underground Stripping (DUS I) Remnants CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 4, 2012 CX-008632: Categorical Exclusion Determination Sampling of Soil Vapor Extraction Wells at the Western Sector Dynamic Underground Stripping System CX(s) Applied: B3.1 Date: 06/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 4, 2012 CX-008482: Categorical Exclusion Determination Composite Riser for Ultra-Deepwater High Pressure Wells CX(s) Applied: A9, A11 Date: 06/04/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory June 4, 2012

492

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

883: Categorical Exclusion Determination 883: Categorical Exclusion Determination Green Industry Business Development CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Champaign, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001877: Categorical Exclusion Determination Joliet Junior College Facilities Building CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001833: Categorical Exclusion Determination Energy Efficiency Conservation Municipal Grants - ALASKA - Energy Efficiency and Conservation Block Grant CX(s) Applied: A9, A11, B5.1 Date: 04/20/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-001768: Categorical Exclusion Determination

493

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003491: Categorical Exclusion Determination Fond du Lac Hydroelectric Project CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Fond du Lac, Minnesota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003487: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Dry Prong, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003484: Categorical Exclusion Determination Recovery Act - State Energy Program CX(s) Applied: B5.1 Date: 08/17/2010 Location(s): Bossier City, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 17, 2010 CX-003486: Categorical Exclusion Determination

494

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 CX-007886: Categorical Exclusion Determination Development of a 300°C, 200 level, 3C Fiber Optic Downhole Seismic Receiver Array for Surveying and Monitoring of Geothermal Reservoirs CX(s) Applied: A9, B3.6, B3.11 Date: 01/25/2012 Location(s): California Offices(s): Golden Field Office January 25, 2012 CX-007819: Categorical Exclusion Determination Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region January 25, 2012 CX-007596: Categorical Exclusion Determination Ohio Advanced Transportation Partnership CX(s) Applied: B5.23 Date: 01/25/2012 Location(s): Ohio Offices(s): National Energy Technology Laboratory January 24, 2012 CX-008675: Categorical Exclusion Determination

495

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 CX-001740: Categorical Exclusion Determination Berks County, Pennsylvania, Boiler Plant Improvements - American Recovery and Reinvestment Act-Energy Efficiency and Conservation Block Grant CX(s) Applied: B2.5, B5.1 Date: 03/30/2010 Location(s): Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 30, 2010 CX-001583: Categorical Exclusion Determination Dynamic Energy Consumption Management of Routing Telecom and Data Centers CX(s) Applied: A9 Date: 03/30/2010 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 30, 2010 CX-001582: Categorical Exclusion Determination Regional Biomass Feedstock Partnership CX(s) Applied: A9 Date: 03/30/2010 Location(s): South Dakota Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

496

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-006505: Categorical Exclusion Determination Clean Cities Transportation Sector Petroleum Reduction Project CX(s) Applied: A7 Date: 08/29/2011 Location(s): Salt Lake City, Utah Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 29, 2011 CX-006597: Categorical Exclusion Determination Vermont Biofuels Initiative: State Line Biofuels 09 CX(s) Applied: B5.1 Date: 08/29/2011 Location(s): North Bennington, Vermont Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 29, 2011 CX-006595: Categorical Exclusion Determination Routine Monitoring and Maintenance, Sherwood, Washington, Disposal Site CX(s) Applied: B1.3, B1.11, B3.1 Date: 08/29/2011 Location(s): Sherwood, Washington Office(s): Legacy Management

497

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7842: Categorical Exclusion Determination 7842: Categorical Exclusion Determination Energy Efficient Windows and Doors for City Owned Buildings CX(s) Applied: B5.1 Date: 11/28/2011 Location(s): Pennsylvania Offices(s): Energy Efficiency and Renewable Energy November 28, 2011 CX-008005: Categorical Exclusion Determination Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office November 28, 2011 CX-007509: Categorical Exclusion Determination Record of Categorical Exclusion for Use of RW Surge Line to Big Hill Anhydrite Pond for Raw Water Intake Structure Recycle CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office November 28, 2011 CX-008004: Categorical Exclusion Determination

498

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 CX-008626: Categorical Exclusion Determination Replace 607-6A Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008625: Categorical Exclusion Determination Abandonment of M-Area Oil Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008624: Categorical Exclusion Determination Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 20, 2012 CX-008623: Categorical Exclusion Determination Perform Thermal Analysis and Thermal Exposures (TG-DTA)

499

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-002268: Categorical Exclusion Determination From Sensing to Enhancing the Brain Processes CX(s) Applied: B3.12 Date: 02/25/2010 Location(s): Albuquerque, New Mexico Office(s): NNSA-Headquarters, Sandia Site Office February 24, 2010 CX-006661: Categorical Exclusion Determination Repair Flowline at 83-AX-4 CX(s) Applied: B5.2, B5.4 Date: 02/24/2010 Location(s): Casper, Wyoming Office(s): RMOTC February 24, 2010 CX-001126: Categorical Exclusion Determination 183-2C Removal of Switchgear Cubicle CX(s) Applied: B4.10 Date: 02/24/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2010 CX-000907: Categorical Exclusion Determination Improved Design Tools for Surface Water and Standing Column Well Heat Pump

500

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005134: Categorical Exclusion Determination Provision of Funds to the Yakama Nation for the Purchase of Three Parcels of Property Along Reecer Creek CX(s) Applied: B1.25 Date: 01/28/2011 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration January 27, 2011 CX-005173: Categorical Exclusion Determination Roof Replacement/Repair, Gutters, and Downspouts CX(s) Applied: B5.1 Date: 01/27/2011 Location(s): Northampton County, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, Golden Field Office January 27, 2011 CX-005127: Categorical Exclusion Determination Philadelphia (Pennsylvania): Energy Loan to Community Legal Services for the Erie Avenue Office CX(s) Applied: B5.1 Date: 01/27/2011 Location(s): Philadelphia, Pennsylvania