Powered by Deep Web Technologies
Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

2

Organization Name Date Submitted File Name ACEEE Steve Nadel  

Broader source: Energy.gov (indexed) [DOE]

Submitted File Name ACEEE Steve Nadel 4/15/2011 ACEEE 4.15.2011 Alameda-Contra Coasta Transit District Chris Peeples 4/15/2011 Alameda-Contra Coasta Transit District 4.15.2011 American Academy of Arts and Sciences Robert W. Fri and Leslie C. Berlowitz 4/15/2011 American Academy of Arts and Science 4.15.2011 American Electric Power Michael L. Weinstein 4/15/2011 AEP 4.15.2011 American Gas Association, American Gas Foundation, American Public Gas Association, American Public Gas Association Research Foundation, Interstate Natural Gas Association of America, and the INGAA Foundation, Inc. Andrew K. Soto 4/15/2011 American Gas Association 4.15.2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Mark Ames 4/14/2011 American Society of Heating, Refrigerating and Air-Conditioning

3

Comment submitted by Traulsen regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Traulsen regarding the Energy Star Verification Testing Program

4

Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

5

Comment submitted by Consumers Union regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Consumers Union regarding the Energy Star Verification Testing Program

6

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

faqfinaldecember-2010.pdf More Documents & Publications Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program DOE...

7

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network [OSTI]

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST METHOD SELECTION LIST ­ CRYPTOGRAPHIC AND SECURITY TESTING NVLAP CRYPTOGRAPHIC AND SECURITY TESTING APPLICATION FORM (REV. 2013 and Security (BCS)" testing and is considered the foundation of all scopes of accreditation

8

Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program

9

Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program

10

Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program

11

Comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program

12

Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

13

Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program

14

Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

15

Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program

16

Date submitted to IS: REQUEST FOR CERTIFICATION OF ATTENDANCE FOR NON-  

E-Print Network [OSTI]

Information About You: LAST NAME: _________________ First Name: __________ Date: ______ Solar I.D. #: _____________________ Date of Birth: ___________ Semester First Entered Stony Brook: ________ Passport No

17

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network [OSTI]

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST PROCEDURE SELECTION LIST ­ HEALTHCARE IT TESTING NVLAP HEALTHCARE IT TESTING APPLICATION (2013-01-02) PAGE 1 OF 3 Instructions: Please check the method for which you are requesting accreditation. NVLAP Code Test Procedure Description 2011

18

DATE: __________________ NVLAP LAB CODE: _________________ Test Method  

E-Print Network [OSTI]

_____ 30/DISC00A ANSI/INCITS 423.1 (2008) Information Technology - Conformance Testing Methodology Standard _____ 30/DISC01A ANSI/INCITS 423.2 (2008) Information Technology - Conformance Testing Methodology Standard - Part 2: Finger minutiae data _____ 30/DISC03A ANSI/INCITS 423.3 (2009) Information Technology

19

DATE  

Broader source: Energy.gov (indexed) [DOE]

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

20

Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with DOE Aerosys Agrees to Pay Civil Penalty and Submit Test Data in Settlement with DOE July 6, 2010 - 3:08pm Addthis WASHINGTON, DC - The Department of Energy announced today that AeroSys, Inc. has agreed to pay a civil penalty of $25,000 and take a number of other actions designed to ensure its future compliance with DOE's energy efficiency standards. Last fall, the Department subpoenaed AeroSys's data on the energy use of certain heat pumps and air conditioners and then issued a demand to test 6 air conditioner models and one heat pump. DOE testing revealed that one heat pump model and two air conditioner models consumed more energy than allowed under federal efficiency standards and required AeroSys to cease distribution of those models. DOE also issued

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program

22

Comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program

23

Comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program

24

Comment submitted by the Natural Resources Defense Council (NRDC) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

⋅ WASHINGTON, DC ⋅ LOS ANGELES ⋅ BEIJING ⋅ CHICAGO ⋅ WASHINGTON, DC ⋅ LOS ANGELES ⋅ BEIJING ⋅ CHICAGO San Francisco, CA 94104 TEL 415 875-6100 FAX 415 875-6161 www.nrdc.org NRDC Comments on DOE's April 22, 2011 Verification Testing in Support of Energy Star Proposal Submitted by: Noah Horowitz Senior Scientist Natural Resources Defense Council (NRDC) May 9, 2011 On behalf of the Natural Resources Defense Council (NRDC) and it's more than 1.3 million members and e-activists, we respectfully submit comments on DOE's Verification Testing in Support of ENERGY STAR proposal. Verification testing programs are critical to ensure that products are performing as promised and consumers are receiving the energy and utility savings claimed by the manufacturer. With one exception, NRDC strongly supports DOE's proposal for conducting verification

25

DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure  

Broader source: Energy.gov [DOE]

The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

26

Dates  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

27

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

28

DATE:  

Broader source: Energy.gov (indexed) [DOE]

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

29

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The...

30

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

31

Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE CENTER * 2000 N. M63 - MD 3005 * BENTON HARBOR, MI 49022 * 269.923.4646 ADMINISTRATIVE CENTER * 2000 N. M63 - MD 3005 * BENTON HARBOR, MI 49022 * 269.923.4646 May 9, 2011 Via email Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 ESTARVerificationTesting@ee.doe.gov Re: DOE ENERGY STAR Verification Testing Program Dear Ms. Armstrong: We appreciate the opportunity to comment on the DOE Verification Testing Program that was put forth on April 22, 2011 (DOE Testing Document). As a very active member of the Association of Home Appliance Manufacturers (AHAM), we have worked closely with them in the development of the comments they have submitted (under separate cover)

32

DATE:  

Broader source: Energy.gov (indexed) [DOE]

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

33

Date  

Broader source: Energy.gov (indexed) [DOE]

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

34

DATE  

Broader source: Energy.gov (indexed) [DOE]

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

35

DATE:  

Broader source: Energy.gov (indexed) [DOE]

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

36

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

37

DATE:  

Broader source: Energy.gov (indexed) [DOE]

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

38

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

39

DATE:  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

40

DATE:  

Broader source: Energy.gov (indexed) [DOE]

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DATE:  

Broader source: Energy.gov (indexed) [DOE]

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

42

DATE:  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

43

DATE:  

Broader source: Energy.gov (indexed) [DOE]

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

44

DATE:  

Broader source: Energy.gov (indexed) [DOE]

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

45

DATE  

Broader source: Energy.gov (indexed) [DOE]

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

46

DATE  

Broader source: Energy.gov (indexed) [DOE]

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

47

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

48

Comment submitted by Consumers Union regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

May 9, 2011 Ms. Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 Via: ESTARVerificationTesting@ee.doe.gov. Re: Comments on Department of Energy's Energy Star Verification Testing Introduction Consumers Union of United States, Inc., 1 publisher of Consumer Reports®, submits the following comments in response to the U.S. Department of Energy ("DOE" or "Department") in the above-referenced matter. Comments Consumers Union has consistently urged DOE to strengthen its verification program for energy usage claims for appliances and is very 1 Consumers Union of United States, Inc., publisher of Consumer Reports®, is a nonprofit membership organization chartered in 1936 to provide consumers with information, education,

49

DATE  

Broader source: Energy.gov (indexed) [DOE]

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

50

DATE  

Broader source: Energy.gov (indexed) [DOE]

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

51

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

52

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

53

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

54

DATE  

Broader source: Energy.gov (indexed) [DOE]

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

55

Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

B B S H H O M E A P P L I A N C E S C O R P O R A T I O N May 9, 2011 Via E-Mail Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 ESTARVerificationTesting@ee.doe.gov Re: BSH Comments regarding the document titled "DOE Verification Testing in Support of ENERGY STAR" dated April 22, 2011. Dear Ms. Armstrong: BSH supports the efforts of the Environmental Protection Agency (EPA) and Department of Energy (DOE) to ensure products meet the labeled energy ratings. We encourage an open approach with stakeholder involvement. BSH offers the following comments for consideration. Section 6.1: Test Lab Selection * We fully agree that test labs should have ISO 17025 accreditation, but further would state

56

Comment submitted by Earthjustice regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

AL AS KA C AL IF O R N I A FL O R I D A M I D - P A C I F I C N O R T H E A S T N O R T H E R N R O C K I E S N O R T H W E S T R O C K Y M O U N T A I N W A S H I N G T O N , D C I N T E R N A T I O N A L BY E-MAIL Ashley Armstrong U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 208-0121 ESTARVerificationTesting@ee.doe.gov Re: Energy Star verification testing proposal Earthjustice submits the following comments on DOE's proposed verification testing program for Energy Star certified appliances. 1. Introduction We are pleased to see DOE moving forward with a plan to verify Energy Star certifications. A strong program of verification testing is necessary to protect consumers, to fully realize the potential energy savings from the program, and to restore confidence in a brand that has

57

Comment submitted by Traulsen regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

4401 Blue Mound Rd. www.traulsen.com 817 740-6733 4401 Blue Mound Rd. www.traulsen.com 817 740-6733 Fort Worth, Texas 76106 cboryca@traulsen.com 800 825-8220 Date: May 9, 2011 To: Ms. Ashley Armstrong, Ms. Brenda Edwards From: Mr. Chris Boryca, Engineer II Cc: John Davis, Walt Boryca, Gary Hoying, Mike Lynch, Joe Sanders, Jennifer Baker Reid Subject: DOE Verification in Support of Energy Star These comments are in response to the document released on April 22, 2011 related to verification testing in support of Energy Star. As a general statement Traulsen is pleased to hear that the DOE and EPA are working together. We do have several concerns, some of which the DOE has seen before and will be quickly restated. 6.3 Manufacturer Notification Traulsen believes that barring manufacturers who operate qualified "Client Test Data Program" test labs from

58

Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

Date: May 9, 2011 To: ESTARVerificationTesting@ee.doe.gov From: Mary Ann Dickinson, President and CEO Re: Comments on DOE Verification Testing in Support of Energy Star (www1.eere.energy.gov/buildings/appliance_standards/pdfs/estar_verification_process.pdf) The Alliance for Water Efficiency is pleased to provide DOE with comments on the above document. We are a North American non-profit organization, composed of diverse stakeholders with significant experience in water efficiency programs and conservation policies. Our mission is to promote the efficient and sustainable use of water, to promote cost-effective water efficiency measures that will reduce wasteful consumption, reduce the need for additional drinking water and waste water capacity, and provide multiple

59

Submitted to WRR 1 Use of hydraulic tests at different scales to characterize fracture network properties in  

E-Print Network [OSTI]

Submitted to WRR 1 Use of hydraulic tests at different scales to characterize fracture network, hydraulic conductivity, fracture, anisotropy 1. INTRODUCTION Hard rocks and their associated aquifers occur properties in the weathered-fractured layer of a hard rock aquifer J.C. Maréchala,b* , B. Dewandela , K

Boyer, Edmond

60

Date 2014/05/06 By B. Lucier * final-tests.scm: Add dirichlet-tests ...  

E-Print Network [OSTI]

final-tests.scm: specialize all floating-point operations to be either fixnum or flonum * matlab-to-pufs-triangulation.scm: New file; define coordinates->vertices,

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

From: Adams, Charlie From: Adams, Charlie Sent: Friday, May 06, 2011 03:38 PM To: Adams, Charlie Cc: Dana, Paul; Parker, Mike; Porter, Jerry; Schulz, Matt; Schuh, Darrell; Roy Smith; Ted Poulin; Berning, Dave; Dan Snyder Subject: Comments on ENERGY STAR verification testing program Hi, Ashley. A.O. Smith has the following comments in regard to DOE's ENERGY STAR® verification test program: * DOE and EPA appear to be working to pool the units tested under each program so that there is no double testing of units, and that all units tested count towards the total required for test during the specified period. This is great, and we appreciate their efforts. * In the selection for testing, we agree that new technologies and units that are above the Energy Star level of performance are of interest, but the majority of testing should be

62

Comment submitted by the Association of Home Appliance Manufacturers (AHAM) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

9, 2011 9, 2011 Via E-Mail Ashley Armstrong U.S. Department of Energy Building Technologies Program 1000 Independence Avenue, SW Washington, DC 20585-0121 ESTARVerificationTesting@ee.doe.gov Re: DOE ENERGY STAR Verification Testing Program Dear Ms. Armstrong: On behalf of the Association of Home Appliance Manufacturers (AHAM), I would like to provide our comments on the DOE Verification Testing Program, as outlined in the document dated April 22, 2011 (DOE Testing Document). AHAM represents manufacturers of major, portable and floor care home appliances, and suppliers to the industry. AHAM's membership includes over 150 companies throughout the world. In the U.S., AHAM members employ tens of thousands of people and produce more than 95% of the household appliances shipped for sale. The factory shipment value of these products

63

Comment submitted by Energizer Battery Manufacturing, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

Energizer Battery Manufacturing, Inc 25225 Detroit Rd. Westlake, OH 44145 Energizer Comments On DOE Verification Testing in Support of ENERGY STAR 1. In the "Conditions and Criteria for Recognition of Certification Bodies for the ENERGY STAR® Program" document on page 3 it states in 3.a.i.2.a that "Annually test at least 10% of all ENERGY STAR qualified models the CB has certified or for which it has received qualified product data". Does the 10% of qualified models pertain to all products the lab has certified or is it 10% of each companies product? This is unclear, please add sufficient detail. 2. On page 7 under program funding, it states "For products tested by DOE under the ENERGY STAR verification program, DOE pays all costs for obtaining and testing products. Verification programs administered by CBs are

64

Comment submitted by the Bradford White Corporation (BWC) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

May 16, 2011 May 16, 2011 Ms. Ashley Armstrong U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Building Technologies Program, EE-2J 1000 Independence Avenue SW Washington, DC 20585-0121 Dear Ms. Armstrong: On behalf of Bradford White Corporation, I would like to express our appreciation for the opportunity to comment on the DOE Verification Testing in support of the ENERGY STAR ® program for water heaters. Please find the comments of Bradford White Corporation (BWC), below. Bradford White Energy strongly urges DOE and the ENERGY STAR program to adopt a five (5) percent tolerance on all Energy Factor (EF) results, no matter the number of representative test samples. The experimental error associated with the water heater EF test protocol is in excess of 5% and is well

65

Comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

From: Donald C Plunkett [mailto:donplunkett@gmail.com] From: Donald C Plunkett [mailto:donplunkett@gmail.com] Sent: Wednesday, April 27, 2011 11:12 AM To: Certification@energystar.gov; ESTARVerificationTesting@ee.doe.gov Cc: luminaires@energystar.gov Subject: (EPA & DOE) Verification Testing Sample Size The EPA and DOE Energy Star verification testing program is an unfair trade practice that burdens small independent US manufacturers while benefiting large importing multinationals. The large multinational Energy Star Partners, independently or through manufacturing associations, expend "millions" of dollars lobbying the EPA and other government agencies (ref: Lobbying Reports via Lobbying Disclosure Act of 1995) to influence Energy Star programs toward their own interests. Not to mention the DOE has

66

Comment submitted by Hobart/ITW Food Equipment Group regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

May 9, 2011 May 9, 2011 DOE Verification Program May 9, 2011 Ashley Armstrong US Department of Energy Reference: DOE Verification Testing in Support of ENERGY STAR Subject: Comments from Hobart, Div. ITW Food Equipment Group Dear Ms. Armstrong, Hobart/ITW Food Equipment Group has been working diligently with the US EPA through NAFEM to ensure that the ENERGY STAR enhancements are fair to Food Service Equipment manufacturers. One of the mainstays has always been that Commercial Food Service equipment should not be required to be verification tested by a third party laboratory. We firmly believe that the proven method of periodic inspections by third-party certification bodies is more than adequate for verifying compliance with energy consumption standards. To that end, we

67

Comment submitted by Hoshizaki America, Inc. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

HOSHIZAKI AMERICA, INC. HOSHIZAKI AMERICA, INC. 618 Highway 74 South, Peachtree City, Georgia 30269 Phone (770) 487-2331 May 9, 2011 Department of Energy 1000 Independence Avenue, SW Washington DC, 20585-0121 Agency: Office of Energy Efficiency and Renewable Energy, Department of Energy Subject: Comments on DOE verification testing in support of ENERGY STAR On behalf of Hoshizaki America, Inc., thank you for the opportunity to comment on the April 22 document, "DOE Verification Testing in Support of ENERGY STAR". Based on review of the contents, Hoshizaki America encourages DOE/EPA administration to note the following: * Commercial foodservice equipment (CFE) is produced and sold in relatively low volumes with the comparison to residential appliances. Grouping CFE with

68

Comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

From: Snyder, Richard A. (Roofing) [mailto:Richard.A.Snyder@saint-gobain.com] From: Snyder, Richard A. (Roofing) [mailto:Richard.A.Snyder@saint-gobain.com] Sent: Monday, May 09, 2011 1:02 PM To: ESTAR_Verification_Testing Cc: Chad.Fisher@us.ul.com; Matt.Overbee@ulenvironment.com; Brandt, Jim C. Subject: Verification Testing Concerns - Asphalt Roofing Products Importance: High Kathleen, I have many concerns and questions about Energy Star Verification program as it relates to Asphalt Roofing Shingles. I am VERY concerned because the attachment seems to imply that a decision on this matter could be made TODAY!!! Is that a possibility? I am not aware of much discussion going on, but if there is please make it public and let me know where to view it. 1) My first question is...is the attached document meant to cover asphalt roofing shingles? Many

69

Comment submitted by InterMetro Industries Corp. regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

InterMetro Industries Corp. InterMetro Industries Corp. 651 North Washington Street Wilkes-Barre, PA 18705-0557 USA T (570) 706-3121 bill.sickles@emerson.com May 5, 2011 Via email to: ESTARVerificationTesting@ee.doe.gov Certification@energystar.gov. InterMetro Industries welcomes the opportunity to comment on the DOE ENERGY STAR verification program as outlined in the April 2, 2011 DOE document. It appears

70

New LM Unit Root Tests in the Presence of a Possible Break of Unknown Date and Size  

E-Print Network [OSTI]

New LM Unit Root Tests in the Presence of a Possible Break of Unknown Date and Size John T. Cuddington and Shuichiro Nishioka December 6, 2005 Abstract: Lagrange Multiplier (LM) unit root tests performs poorly when used in LM unit root tests and propose an alternative procedure that uses the sup

71

Date Event  

Broader source: Energy.gov (indexed) [DOE]

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

72

Submitting Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Jobs Submitting Jobs Submitting Jobs Submitting your job If you are submitting your job on Genepool or Phoebe you do NOT need to source any batch settings. The batch environment has been loaded into your path by default. If qsub is not working properly, check to make sure that the uge module is loaded: module load uge If you are submitting a job from an external submit host you need to source the appropriate settings.sh file for Genepool or Phoebe. source /opt/uge/genepool/uge/genepool/common/settings.sh qsub commands and options UGE (Univa Grid Engine) is the batch system used for Genepool/Phoebe. Action How to do it Comment Submit a job qsub script In UGE you need to submit a script, not an executable. Specify number of processors for a threaded job qsub -pe pe_slots 8 ... Request 8 cores on a single node for your job. Please specify as many processors as will be needed during your job.

73

testSubmit.ps  

E-Print Network [OSTI]

Jan 26, 2004 ... 597632, Springer, Berlin, Berlin 2003. [19] Mark Stefik, Inferring DNA structures from segmentation data, Artificial Intelligence 11 (1978), 85.

2004-01-26T23:59:59.000Z

74

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010  

Broader source: Energy.gov (indexed) [DOE]

FAQ for: ENERGY STAR Verification Testing Pilot Program December 2010 Table of Contents Introduction............................................................................................................................... 1 What product types will be tested? ................................................................................................. 1 Will testing continue after the State Energy Efficient Appliance Rebate Program (SEEARP) ends? .................................................................................................................................................... 1 For Consumers .......................................................................................................................... 1

75

COMPLAINT FORM Submit To: Today's Date  

E-Print Network [OSTI]

Phone City / State / Zip _________ Cell Phone II. TYPE & BASIS OF COMPLAINT (Check the boxes that apply.) Complainant (Name & Title) ______ Department UFID # Address (University) Work Phone Address (Residence) Home #1 (Name & Title) ______ Address (Work) Work Phone Address (Home) Home Phone Mobile Phone Respondent

Pilyugin, Sergei S.

76

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

77

Round-robin testing of Soleq EV cort according to the SAE J1634 test procedure dated May 1993  

SciTech Connect (OSTI)

The Society of Automotive Engineers Recommended Practice, SAE J1634, {open_quotes}Electric Vehicle Energy Consumption and Range Test Procedure{close_quotes}, May 1993, describes a standard method of determining the range and energy consumption for electric vehicles. Consequent to the U.S. Department of Energy`s (DOE) rulemaking released on February 4, 1994, the EPA is currently considering factoring electric vehicles into the Corporate Average Fuel Economy (CAFE) calculations using the SAE J1634 procedure. The purpose of this project is to provide information regarding the suitability of this recommended practice for determining the energy economy value to be factored into the CAFE. Issues leading to possible inconsistent results (such as the repeatability of the procedure, thoroughness of the procedure`s methods, and variance between different laboratories using different dynamometers) need to be resolved prior to passing legislation which will mandate use of this test in determining the electric vehicle CAFE credit. To this end, separate tests were performed on a Soleq EVcort vehicle by the INEL, the EPA, Ford Motor Company, Southwest Research Institute, and the California Air Resources Board using their own facilities and personnel. Acceptable departures from the driving profile prescribed by SAEJ1634 are not well defined. This deficiency in the procedure is even more noticeable due to the EVcort`s marginal acceleration performance.

Cole, G.H.

1993-05-01T23:59:59.000Z

78

Comment submitted by the Air Conditioning, Heating and Refrigeration Institute (AHRI) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

AHRI Comments - DOE Verification Testing in Support of Energy Star AHRI Comments - DOE Verification Testing in Support of Energy Star May 9, 2011 P a g e | 1 May 9, 2010 Ms. Ashley Armstrong U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 RE: DOE Verification Testing in Support of Energy Star Dear Ms. Armstrong: I am writing on behalf of the Air Conditioning, Heating and Refrigeration Institute (AHRI) to address the proposed DOE requirements for verification testing in support of the Energy Star program. AHRI is the trade association representing manufacturers of heating, cooling, and commercial refrigeration equipment. More than 300 members strong, AHRI is an internationally recognized advocate for the industry, and develops standards for and certifies the performance of many of the

79

Comment submitted by the North American Association of Food Equipment Manufacturers (NAFEM) regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov (indexed) [DOE]

From: Charlie Souhrada [mailto:csouhrada@nafem.org] From: Charlie Souhrada [mailto:csouhrada@nafem.org] Sent: Monday, May 09, 2011 3:46 PM To: ESTAR_Verification_Testing Subject: Verification Testing Sample Size On behalf of the North American Association of Food Equipment Manufacturers (NAFEM), thank you for the opportunity to comment on the April 22 document, "DOE Verification Testing in Support of ENERGY STAR". Based on review of the contents, NAFEM encourages DOE/EPA administration to note the following: * Commercial foodservice equipment (CFE) is produced and sold in relatively low volumes, making this product category significantly different from residential appliances. Grouping CFE with residential appliances is both technically inaccurate and economically impractical because the

80

Evolutionary Search for Test Data in the Presence  

E-Print Network [OSTI]

test data has been a burgeoning interest for many researchers in recent years. To date, work in ap have provided an invaluable base for meeting other researchers in this field, and for presentingEvolutionary Search for Test Data in the Presence of State Behaviour by Philip McMinn Submitted

McMinn, Phil

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

INSTRUCTIONS FOR SUBMITTING NUCLEAR  

E-Print Network [OSTI]

waste management proceedings. Keywords Nuclear, nuclear power plant, spent fuel, nuclear waste, dataCALIFORNIA ENERGY COMMISSION INSTRUCTIONS FOR SUBMITTING NUCLEAR POWER PLANT-RELATED DATA of Submitted Data 3 NUCLEAR POWER PLANT DATA REQUESTS 6 A. Environmental Impacts 6 B. Spent Fuel Generation 8 C

82

Final Report - Enhanced LAW Glass Formulation Testing, VSL-07R1130-1, Rev. 0, dated 10/05/07  

SciTech Connect (OSTI)

The principal objective of this work was to extend the glass formulation methodology developed in the earlier work [2, 5, 6] for Envelope A, B and C waste compositions for development of compliant glass compositions targeting five high sodium-sulfur waste loading regions. This was accomplished through a combination of crucible-scale tests, and tests on the DM10 melter system. The DM10 was used for several previous tests on LAW compositions to determine the maximum feed sulfur concentrations that can be processed without forming secondary sulfate phases on the surface of the melt pool. This melter is the most efficient melter platform for screening glass compositions over a wide range of sulfate concentrations and therefore was selected for the present tests. The tests were conducted to provide information on melter processing characteristics and off-gas data, including sulfur incorporation and partitioning. As described above, the main objective was to identify the limits of waste loading in compliant glass formulations spanning the range of expected Na{sub 2}O and SO{sub 3} concentrations in the LAW glasses.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-11-13T23:59:59.000Z

83

Submitting PDSF Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting PDSF Jobs Submitting PDSF Jobs Submitting PDSF Jobs Univa Grid Engine (UGE) is the batch system used at PDSF. This is a fork of the Sun Grid Engine (SGE). PDSF batch jobs have a 1 day wallclock limit. If your job attempts to run beyond the wallclock limit UGE will kill it. The total number of jobs (running, pending or otherwise) for all users is limited to 30,000 and the number of jobs a single user can have at any one time is limited to 5000. Since PDSF is a shared facility any jobs that are detrimental to the overall performance of the batch system are subject to being deleted at the discretion of the PDSF staff. If this happens, you will be notified and asked to adjust your workflow as necessary. If you are planning to submit thousands of short jobs concurrently consider

84

Submitted to Topology Proceedings  

E-Print Network [OSTI]

Submitted to Topology Proceedings TUKEY CLASSES OF ULTRAFILTERS ON DAVID MILOVICH Abstract, nor U, is Tukey equivalent to [c]() = p = c. We also prove two negative ZFC results about the possible Tukey classes of ultrafilters

Milovich, David

85

Microsoft Word - AHEdoeprogressreportfinalreview093009submitted  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Use Use of Air2Air TM Technology to Recover Fresh-Water from the Normal Evaporative Cooling Loss at Coal-Based Thermoelectric Power Plants Final Report Project Dates: 7/31/06 - 9/30/09 September 30, 2009 For DOE Funding Opportunity - Advanced Technologies and Concepts to Minimize Freshwater Use in Coal-Based Thermoelectric Power Plants Funding Opportunity Number: DE-PS26-05NT42411 Instrument Number: DEFC2605NT42725 CFDA Number: 81.089 Fossil Energy Research and Development Submitting Organiazation: SPX Cooling Technologies 7401 West 129 th Street Overland Park, KS 66213 Principal Author/Investigator: Ken Mortensen Phone: 913-664-7723 Fax: 913-664-7871 E-mail: ken.mortensen@spx.com II DISCLAIMER "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof,

86

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

87

Testing of low-temperature stabilization alternatives for salt containing mixed wastes -- Approach and results to date  

SciTech Connect (OSTI)

Through its annual process of identifying technology deficiencies associated with waste treatment, the Department of Energy`s (DOE) Mixed Waste Focus Area (MWFA) determined that the former DOE weapons complex lacks efficient mixed waste stabilization technologies for salt containing wastes. These wastes were generated as sludge and solid effluents from various primary nuclear processes involving acids and metal finishing; and well over 10,000 cubic meters exist at 6 sites. In addition, future volumes of these problematic wastes will be produced as other mixed waste treatment methods such as incineration and melting are deployed. The current method used to stabilize salt waste for compliant disposal is grouting with Portland cement. This method is inefficient since the highly soluble and reactive chloride, nitrate, and sulfate salts interfere with the hydration and setting processes associated with grouting. The inefficiency results from having to use low waste loadings to ensure a durable and leach resistant final waste form. The following five alternatives were selected for MWFA development funding in FY97 and FY98: phosphate bonded ceramics; sol-gel process; polysiloxane; polyester resin; and enhanced concrete. Comparable evaluations were planned for the stabilization development efforts. Under these evaluations each technology stabilized the same type of salt waste surrogates. Final waste form performance data such as compressive strength, waste loading, and leachability could then be equally compared. Selected preliminary test results are provided in this paper.

Maio, V.; Loomis, G. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Spence, R.D. [Oak Ridge National Lab., TN (United States); Smith, G. [Pacific Northwest National Lab., Richland, WA (United States); Biyani, R.K. [SGN Eurisys Services Corp., Richland, WA (United States); Wagh, A. [Argonne National Lab., IL (United States)

1998-05-01T23:59:59.000Z

88

Testing of low temperature stabilization alternatives for salt-containing mixed wastes -- approach and results to date  

SciTech Connect (OSTI)

Through its annual process of identifying technology deficiencies associated with waste treatment, the Department of Energy`s (DOE) Mixed Waste Focus Area (MWFA) determined that the former DOE weapons complex lacks efficient mixed waste stabilization technologies for salt containing wastes. The current method used to stabilize salt waste for compliant disposal is grouting with Portland cement. This method is inefficient since the highly soluble and reactive chloride, nitrate, and sulfate salts interfere with the hydration and setting processes associated with grouting. The following five alternative salt waste stabilization technologies were selected for MWFA development funding in FY97 and FY98: (1) Phosphate Bonded Ceramics, (2) Sol-gel, (3) Polysiloxane, (4) Polyester Resin, and (5) Enhanced Concrete. Comparable evaluations were planned for the stabilization development efforts. Under these evaluations each technology stabilized the same type of salt waste surrogates as specified by the MWFA. Final waste form performance data such as compressive strength, waste loading, and leachability can then be equally compared to the requirements originally specified. In addition to the selected test results provided in this paper, the performance of each alternative stabilization technology, will be documented in formal MWFA Innovative Technology Summary Reports (ITSRs).

Maio, V.; Loomis, G. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States)] [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Biyani, R.K. [SGN Eurisys Services Corp., Richland, WA (United States)] [SGN Eurisys Services Corp., Richland, WA (United States); Smith, G. [Pacific Northwest National Lab., Richland, WA (United States)] [Pacific Northwest National Lab., Richland, WA (United States); Spence, R. [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States); Wagh, A. [Argonne National Lab., IL (United States)] [Argonne National Lab., IL (United States)

1998-07-01T23:59:59.000Z

89

DOE Warns Manufacturers Who Submitted Incomplete Certification Reports |  

Broader source: Energy.gov (indexed) [DOE]

Warns Manufacturers Who Submitted Incomplete Certification Warns Manufacturers Who Submitted Incomplete Certification Reports DOE Warns Manufacturers Who Submitted Incomplete Certification Reports February 2, 2010 - 1:53pm Addthis Washington, DC - The Department of Energy's Office of General Counsel has sent warning letters to 9 manufacturers or trade associations that submitted incomplete energy-efficiency test data to comply with DOE's energy-efficiency standards. This data was submitted during the 30-day grace period that ran from December 9, 2009, to January 8, 2010. Data for about 600,000 products was submitted. In this case, however, the data was incomplete. In light of the apparent attempt to comply with Department's regulations, the warning letters simply identify various substantive deficiencies in the data submitted, demand their expeditious

90

ARM - Submitting Proposals : Guidelines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

91

Submitting Organization Sandia National ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

systems. To date, large investments in contaminant-specific sensors utilizing micro and nano technologies have not yet demonstrated the engineering reliability...

92

Date Submitted: December 2010 Reason for Submission: (Check One)  

E-Print Network [OSTI]

New Position, Initial Evaluation on POSITION DESCRIPTION Position Title: Supervisor, Event Operations Leave Contract POSITION SUMMARY Reporting to the Manager, Event Operations, and working in conjunction with the Supervisors, Event Operations is a hands on supervisory position for the Conference and Events department

Garousi, Vahid

93

Date Submitted: January 2013 Reason for Submission: (Check One)  

E-Print Network [OSTI]

to ensure an efficient, high quality and profitable food service. The Executive Chef directs and motivates) The Executive Chef is a collaborate member of the Food, Beverage and Events senior management team responsible for the development of long-term strategy and tactics related to the overall Food, Beverage and Events area's business

Habib, Ayman

94

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Broader source: Energy.gov (indexed) [DOE]

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

95

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

96

DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

97

DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

98

Submitting Batch Jobs on Franklin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Debug Jobs Short jobs requesting less than 30 minutes and requiring 512 nodes (2,048 cores) or fewer can run in the debug queue. From...

99

FINAL Submitted to NREL  

Broader source: Energy.gov (indexed) [DOE]

Submitted to NREL Submitted to NREL 10-21-11 City of Naperville Case Study 1 An example of an automated switch used in Naperville's distribution automation systems. At the Forefront of the Smart Grid: Empowering Consumers in Naperville, Illinois Naperville, Illinois, is a suburban community located outside of Chicago. Typical in many ways, Naperville is the fifth largest city in Illnois and an active, engaged citizenry that is environmentally conscious and technically savvy. In fact, the National Renewable Energy Laboratory's recent assessment of leading utility green power programs ranks Naperville as No. 5 in the nation in percentage of customer participation. 1 Additionally, about one-quarter of Naperville's electricity customers pay their

100

Peer Review Plan Date: 1/31/2012  

E-Print Network [OSTI]

Peer Review Plan Date: 1/31/2012 Source Center: U.S. Geological Survey (USGS) Pacific Island://manoa.hawaii.edu/hpicesu/techr/177/default.htm) and is now being submitted to an outside peer-reviewed journal for publication. The manuscript will now be submitted to a journal, the suggestions of peer reviewers selected by the journal

Torgersen, Christian

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Photo Contest Closing date 2013 9 19  

E-Print Network [OSTI]

2013 About Photo Contest Closing date 2013 9 19 Photo Contest Eligibility International) (8MB ) By E-Mail (Maximum size 8MB per photo, up to 2 photos) kisc-koryu@edu.kobe-u.ac.jp 2) CD-R () By Post or submit by hand to KISC Photos (up to 2 photos) burned on a CD-R. Note that your data

Banbara, Mutsunori

102

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

103

POLICY CHECKLIST To be submitted with the policy as presented at Cabinet  

E-Print Network [OSTI]

POLICY CHECKLIST To be submitted with the policy as presented at Cabinet Initiating party: ______________________________________ Date: _______________ (person who initiated the policy change, project leader) Originating Department/Office: ________________________________________________ Policy name: ______________________________________________________________ New Policy: _____ Amended

Khan, Javed I.

104

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

105

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

106

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

107

Submitting Batch Jobs on Carver  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Submitting Batch Jobs Overview A batch job is the most common way users run production applications on NERSC machines. Carver's batch system is based on the PBS model, implemented with the Moab scheduler and Torque resource manager. Typically, the user submits a batch script to the batch system. This script specifies, at the very least, how many nodes and cores the job will use, how long the job will run, and the name of the application to run. The job will advance in the queue until it has reached the top. At this point, Torque will allocate the requested number of nodes to the batch job. The batch script itself will execute on the "head node" (sometimes known as the "MOM" node). See Queues and Policies for details of batch queues, limits,

108

lead-isotope dating  

Science Journals Connector (OSTI)

lead-isotope dating, lead-lead dating, lead-isotope age measurement, lead-lead age measurement ? Blei-Isotopen(-Alters)bestimmung, f, Blei-Isotopen-Datierung

2014-08-01T23:59:59.000Z

109

Request Log Closedl Date Yes  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

110

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

111

Funding Board Application Please submit your application, resume, and a cover letter to an ASMSU Administrative Assistant in  

E-Print Network [OSTI]

Funding Board Application 2014-2015 Please submit your application, resume, and a cover letter will not be reviewed without a resume and a cover letter. (Please Print) Date:____________________________ Name

Maxwell, Bruce D.

112

The Impact of the Item Types and Number of Solution Steps of Multiple-Choice Items on Item Difficulty and Discrimination and Test Reliability  

E-Print Network [OSTI]

The Impact of the Item Types and Number of Solution Steps of Multiple-Choice Items on Item Difficulty and Discrimination and Test Reliability By Erkan Hasan Atalmis Submitted to the graduate degree program in the Department of Psychology... ________________________________ Bruce Frey ________________________________ Marianne Perie ________________________________ Argun Saatcioglu ________________________________ William Skorupski Date Defended: 5/5/14 The Dissertation Committee for Erkan Hasan...

Atalmis, Erkan Hasan

2014-08-31T23:59:59.000Z

113

Final Report - Glass Formulation Testing to Increase Sulfate Volatilization from Melter, VSL-04R4970-1, Rev. 0, dated 2/24/05  

SciTech Connect (OSTI)

The principal objectives of the DM100 and DM10 tests were to determine the impact of four different organics and one inorganic feed additive on sulfate volatilization and to determine the sulfur partitioning between the glass and the off-gas system. The tests provided information on melter processing characteristics and off-gas data including sulfur incorporation and partitioning. A series of DM10 and DM100 melter tests were conducted using a LAW Envelope A feed. The testing was divided into three parts. The first part involved a series of DM10 melter tests with four different organic feed additives: sugar, polyethylene glycol (PEG), starch, and urea. The second part involved two confirmatory 50-hour melter tests on the DM100 using the best combination of reductants and conditions based on the DM10 results. The third part was performed on the DM100 with feeds containing vanadium oxide (V{sub 2}O{sub 5}) as an inorganic additive to increase sulfur partitioning to the off-gas. Although vanadium oxide is not a reductant, previous testing has shown that vanadium shows promise for partitioning sulfur to the melter exhaust, presumably through its known catalytic effect on the SO{sub 2}/SO{sub 3} reaction. Crucible-scale tests were conducted prior to the melter tests to confirm that the glasses and feeds would be processable in the melter and that the glasses would meet the waste form (ILAW) performance requirements. Thus, the major objectives of these tests were to: ? Perform screening tests on the DM10 followed by tests on the DM100-WV system using a LAW -Envelope A feed with four organic additives to assess their impact on sulfur volatilization. ? Perform tests on the DM100-WV system using a LAW -Envelope A feed containing vanadium oxide to assess its impact on sulfur volatilization. ? Determine feed processability and product quality with the above additives. ? Collect melter emissions data to determine the effect of additives on sulfur partitioning and melter emissions. ? Collect and analyze discharged glass to determine sulfur retention in the glass. ? Prepare and characterize feeds and glasses with the additives to confirm that the feeds and the glass melts are suitable for processing in the DM100 melter. ? Prepare and characterize glasses with the additives to confirm that the glasses meet the waste form (ILAW) performance requirements.

Kruger, Albert A.; Matlack, K. A.; Pegg, I. L.; Gong, W.

2013-11-13T23:59:59.000Z

114

Final Report - Glass Formulation Development and DM10 Melter Testing with ORP LAW Glasses, VSL-09R1510-2, Rev. 0, dated 6/12/09  

SciTech Connect (OSTI)

The principal objective of the work described in this Final Report is to extend the glass formulation methodology developed in the earlier work by development of acceptable glass compositions for four LAW compositions specified by ORP that cover the range of sulfate to sodium and potassium to sodium ratios expected in Hanford LAW. The glass formulations were designed to exclude titanium and iron as glass former additives, while tin and vanadium as glass former additives were evaluated for beneficial effects in increasing waste loading in the glasses. This was accomplished through a combination of crucible-scale tests and tests on the DM10 melter system. This melter is the most efficient melter platform for screening glass compositions over a wide range of sulfate concentrations and therefore was selected for the present tests. The current tests provide information on melter processing characteristics and off-gas data, including sulfur incorporation and partitioning.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-11-13T23:59:59.000Z

115

Submitting Batch Jobs on Franklin  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Batch Jobs Submitting Batch Jobs Submitting Batch Jobs Debug Jobs Short jobs requesting less than 30 minutes and requiring 512 nodes (2,048 cores) or fewer can run in the debug queue. From 5am-6pm Pacific Time, 256 nodes are reserved for debugging and interactive use. See also, running Interactive Jobs. Sample Batch Scripts The following batch script requests 8 cores on 2 nodes with a 10 minute wall clock limit in the debug queue. Torque directive lines tell the batch system how to run a job and begin with #PBS. #PBS -q debug #PBS -l mppwidth=8 #PBS -l walltime=00:10:00 #PBS -j eo #PBS -V cd $PBS_O_WORKDIR aprun -n 8 ./a.out Here is another example requesting 8 processors using 4 nodes with only 2 cores per node: #PBS -q debug #PBS -l mppwidth=8 #PBS -l mppnppn=2 #PBS -l walltime=00:10:00

116

Date created: Date amended: February 2009  

E-Print Network [OSTI]

or on any relevant individual issue � Determining what types of risk are acceptable and which appetite is usually defined as "the amount of risk that an organisation is prepared to accept, tolerateDate created: Date amended: February 2009 - 1 � Risk Management Policy.doc RISK MANAGEMENT POLICY 1

Subramanian, Sriram

117

Final Report - Testing of Optimized Bubbler Configuration for HLW Melter VSL-13R2950-1, Rev. 0, dated 6/12/2013  

SciTech Connect (OSTI)

The principal objective of this work was to determine the glass production rate increase and ancillary effects of adding more bubbler outlets to the current WTP HLW melter baseline. This was accomplished through testing on the HLW Pilot Melter (DM1200) at VSL. The DM1200 unit was selected for these tests since it was used previously with several HLW waste streams including the four tank wastes proposed for initial processing at Hanford. This melter system was also used for the development and optimization of the present baseline WTP HLW bubbler configuration for the WTP HLW melter, as well as for MACT testing for both HLW and LAW. Specific objectives of these tests were to: Conduct DM1200 melter testing with the baseline WTP bubbling configuration and as augmented with additional bubblers. Conduct DM1200 melter testing to differentiate the effects of total bubbler air flow and bubbler distribution on glass production rate and cold cap formation. Collect melter operating data including processing rate, temperatures at a variety of locations within the melter plenum space, melt pool temperature, glass melt density, and melter pressure with the baseline WTP bubbling configuration and as augmented with additional bubblers. Collect melter exhaust samples to compare particulate carryover for different bubbler configurations. Analyze all collected data to determine the effects of adding more bubblers to the WTP HLW melter to inform decisions regarding future lid re-designs. The work used a high aluminum HLW stream composition defined by ORP, for which an appropriate simulant and high waste loading glass formulation were developed and have been previously processed on the DM1200.

Kruger, Albert A.; Pegg, I. L.; Callow, R. A.; Joseph, I.; Matlack, K. S.; Kot, W. K.

2013-11-13T23:59:59.000Z

118

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

119

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

120

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

CSR Press Release Submitted by  

E-Print Network [OSTI]

CSR Press Release Submitted by: Categories: Posted: Energy Efficiency Listed as the Top important to their work. Across all five sectors included in the survey, energy efficiency was listed as by far the most important sustainability issue at hand, with water and land & soil falling to the bottom

122

Submitted to *Xidian University, China  

E-Print Network [OSTI]

THESIS Submitted to *Xidian University, China *Institut National des Sciences Appliquées de Rouen, France To obtain China-France Joint PhD in Discipline: PHYSICS Speciality: Energy by WANG Jiajie Shaped.09.2011 Members of the jury: Reviewers: Bai Jintao Professor, Northwest University, Xi'an, China Liu Weidong

Boyer, Edmond

123

CSR Press Release Submitted by  

E-Print Network [OSTI]

in 2000, yet fuel consumption decreased by 3.2 million gallons. Fuel efficiency levels were improved, sophisticated routing technology and operational initiatives such as minimizing engine idling. Alternative fuelCSR Press Release Submitted by: Categories: Posted: UPS Sets New Automotive Goal to Improve Fuel

124

Seismic viscoelastic attenuation Submitted to  

E-Print Network [OSTI]

Seismic viscoelastic attenuation Submitted to: Encyclopedia of Solid Earth Geophysics Harsh Gupta-3046 USA E-mail: vernon.cormier@uconn.edu Tel: 860-486-3547 Fax: 860-486-3346 #12;SEISMIC VISCOELASTIC ATTENUATION Synonyms Seismic intrinsic attenuation Definitions Linear viscoelastic attenuation. The loss

Cormier, Vernon F.

125

Advanced Vehicle Testing - Beginning-of-Test Battery Testing...  

Broader source: Energy.gov (indexed) [DOE]

2.5 V Thermal Mgmt.: Passive, Vacuum-Sealed Unit Pack Weight: 294 kg BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 6,696 mi Date of...

126

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

127

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND  

E-Print Network [OSTI]

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND MAINTENANCE SUMMARY DIVING SAFETY PROGRAM Date Tested Condition when received Intermediate Pressure Inhalation Resistance Exhalation Resistance Tested Make Serial Number Date Tested Results DEPTH GAUGE BUOYANCY COMPENSATOR Make Serial Number Date

Wilcock, William

128

PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL ...  

E-Print Network [OSTI]

Apr 16, 2010 ... PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL GRADES. Please view rather than print this information. A version without...

saerens

2010-04-16T23:59:59.000Z

129

Fermilab Legal Office - Ethics Program - Submit a Question  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submit a Question Ask the Ethicist Ask the Ethicist Questions & Answers Submit a Question Annual Reminders Reporting Fraud Holiday Parties Complete the form below to submit a...

130

SELECTION OF FACULTY RESEARCH ADVISOR (Submit to the Graduate Education Office, 4404 TBBC)  

E-Print Network [OSTI]

32 ` SELECTION OF FACULTY RESEARCH ADVISOR (Submit to the Graduate Education Office, 4404 TBBC) _____________________________________________________________(date) II. List your top three choices for your research advisor. 1st choice a Departmental Safety Seminar, and the research advisor must assume responsibility for his/her lack of training

Simons, Jack

131

Submitted to the Annals of Applied Statistics INTERPOLATING FIELDS OF CARBON MONOXIDE  

E-Print Network [OSTI]

and transport. CO AMS 2000 subject classifications: Carbon monoxide; satellite data; Bayesian hierarchi- cal models; interpolation; data assimilation 1 imsart-aoas ver. 2007/04/13 file: COpaper.tex date: March 24Submitted to the Annals of Applied Statistics INTERPOLATING FIELDS OF CARBON MONOXIDE DATA USING

Nychka, Douglas

132

NIF NOI 2009_E Page 1 of 6 Notice of Intent to Submit an Application  

E-Print Network [OSTI]

NIF NOI 2009_E Page 1 of 6 Notice of Intent to Submit an Application New Initiatives Fund (NIF Foundation for Innovation NIF NOI 2009_E Page 2 of 6 Date printed (dd/mm/yyyy): 27/06/2008 Canadian

Martin, Jeff

133

Carbon Dioxide Footprint of the Northwest Power System Comments submitted by Grant County Public Utility District  

E-Print Network [OSTI]

Carbon Dioxide Footprint of the Northwest Power System Comments submitted by Grant County Public paper: Carbon Dioxide Footprint of the Northwest Power System, dated September 13, 2007. The Grant done a very thorough job of assessing the current and future carbon dioxide footprints of the Northwest

134

Submitting a Proposal to DOE | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Submitting a Proposal to DOE Submitting a Proposal to DOE Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Selecting a Host DOE Laboratory Developing a Research Proposal Recommender Information Student Participants Submitting a Proposal to DOE Application Selection Process and Notification Key Dates Frequently Asked Questions Contact WDTS Home How to Apply Submitting a Proposal to DOE Print Text Size: A A A RSS Feeds FeedbackShare Page Through direct collaboration with research staff at DOE host laboratories, the VFP program provides an opportunity for faculty to help create innovative new capabilities and make discoveries germane to DOE science missions. Through the experience, visiting faculty members also develop integrated skills that translate to programs at their home institutions,

135

COUNTRY INSTITUTION SIGNING DATE  

E-Print Network [OSTI]

COUNTRY INSTITUTION SIGNING DATE /RENEWAL WEB SITE ALBANIA University of Tirana 11.12.2001 www /RENEWAL WEB SITE FINLAND JAMK University of Applied Sciences 29.10.2009 www.jamk.fi/ FRANCE ?cole INSTITUTION SIGNING DATE /RENEWAL WEB SITE MACEDONIA St. Cyril and Methodius" University of Skopje 11

Di Pillo, Gianni

136

Iraq Produces Date Sugar  

Science Journals Connector (OSTI)

Iraq will soon begin manufacture of sugar from dates as a result of experiments carried out under a UNESCO program by a Swiss scientist. Development of this industry will save the country some $16 million annually formerly spent for imported sugar.Dates ...

1955-04-18T23:59:59.000Z

137

C3Bio.org - Tags: test  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

.jpeg, .jpe, .bmp, .tif, .tiff, .png, .gif) Submit You are here: Home Tags test All Categories Tags: test More tags Categories All Categories 9 Wiki Pages 9 Note:...

138

DATE: ____________________ NVLAP LAB CODE: __________________ Test Method  

E-Print Network [OSTI]

Panel Materials-Part A, Sec. 11-20: Static Bending ______ 23/G02a ANSI A208.1-1999 (Sec. 3.3.7) Particleboard, Sec. 3.3.7: Modulus of Rupture and Modulus of Elasticity ______ 23/G02b ANSI A208.2-2002 (Sec. 3 to Surface ______ 23/G03a ANSI A208.1-1999 (Sec. 3.3.6) Particleboard, Sec. 3.3.6: Internal Bond ______ 23/G

139

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

140

Dating the Vinland Map  

ScienceCinema (OSTI)

Scientists from Brookhaven National Laboratory, the University of Arizona, and the Smithsonian Institution used carbon-dating technology to determine the age of a controversial parchment that might be the first-ever map of North America.

None

2013-07-17T23:59:59.000Z

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

NIST ITL submits PINS form to ANSI  

E-Print Network [OSTI]

1 NIST ITL submits PINS form to ANSI for initiation of project to draft new or revised ANS. ANSI consensus body, starting with pre- canvass notice and invitation, which is posted on the ANSI/ NIST and develops canvass list. NIST ITL issues 45-day ballot and submits to ANSI for concurrent 45- day public

142

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL YEAR BREAKDOWN OF FUNDS ELEMENTS FY FY FY FY FY TOTAL Direct Labor Overhead Materials Supplies Travel Other Direct...

143

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Visiting Faculty Program (VFP) VFP Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. VFP Term: Summer 2014 On-line Application Opens October 18, 2013 Applications Due January 10, 2014 5:00 PM ET* Offer Notification Period Begins January 20, 2014 All DOE Offers and Notifications Complete April 1, 2014 *A research proposal co-developed with a DOE laboratory researcher must be electronically submitted by all faculty applicants as part of their

144

Important Purdue and Departmental Dates  

E-Print Network [OSTI]

Purdue holidayno classes this week. ... Once the webform is submitted the link to it becomes inactive but you can still make ... End of Spring TA employment.

145

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

146

History of Radiocarbon Dating  

DOE R&D Accomplishments [OSTI]

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

147

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

148

Categorical Exclusion Determination Form It Submit by E-_  

Broader source: Energy.gov (indexed) [DOE]

It Submit by E-_ It Submit by E-_ I'llail - ] Proposed Action Title: (0672- 1610) Eaton Corporation - Highly Efficient, Nea r-Isothermal Liquid-Piston Compressor fo r Low Cost At-Home Natural Gas Refueli ng Program or Field Office: Advanced Research Projects Agency - Energy LocationCs) CCity/County/State): Southfield, MI ; Eden Prairie, MN; Minneapolis, MN; and Milwaukee, WI Proposed Action Description: Funding will support efforts to develop a highly efficient, near isothermal liquid piston compressor for low cost, at-home natu ral gas refueling Proposed work will consist of: (1) develop and optimize a concept compressor design to achieve established performance and cost targets; (2) characterize and verify the expected performance for the compressor design; and (3) develop a compressor system prototype to test proof of

149

Create Date: Create Time  

E-Print Network [OSTI]

provisions. AB 0074 Ch. 666 Assembly Member Ma Public event action plans and cooperative agreements. AB 0080 Ch. 138 Assembly Member Fong Presidential primary: election date. AB 0082 Ch. 92 * Assembly Assembly Member Fong Elections: new citizens. AB 0089 Ch. 390 * Assembly Member Hill County employees

150

Quantum Dating Market  

E-Print Network [OSTI]

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

151

Peer Review of Manuscripts Submitted Via the Academy Fellowship Track  

Science Journals Connector (OSTI)

...author and source are credited. Peer Review of Manuscripts Submitted Via...Casadevall A, Collier RJ. 2011. Peer review of manuscripts submitted via...have been scrutinized by several peers, generating reviews in addition to the those submitted...

Arturo Casadevall; R. John Collier

2011-06-01T23:59:59.000Z

152

Structure of pre-Supervisory Committee Meeting (PRE-SCM) report: Abstract of work to date (250 words max)  

E-Print Network [OSTI]

Appendix B Structure of pre-Supervisory Committee Meeting (PRE-SCM) report: Abstract of work to date (250 words max) An abstract of the work to date, providing general background and explaining how the work fits in the field of your project. This abstract can be very similar to the one submitted

Woodgett, Jim

153

Procedures for Submitting Documents for Posting on the DOE NEPA...  

Broader source: Energy.gov (indexed) [DOE]

Procedures for Submitting Documents for Posting on the DOE NEPA Website Procedures for Submitting Documents for Posting on the DOE NEPA Website The Electronic DOE NEPA document...

154

Video Tutorial for Submitting a 2014 ERCAP Request available  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Video Tutorial for Submitting a 2014 ERCAP Request available Video Tutorial for Submitting a 2014 ERCAP Request available September 17, 2013 (0 Comments) Rushing to meet the...

155

FROM: DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

156

DATE: February 7, 1996  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

157

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

158

ENERGY STAR Appliance Verification Testing - Pilot Program Summary...  

Broader source: Energy.gov (indexed) [DOE]

Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3,...

159

Revision Date: 02.10.2009 MATERIAL & DISBURSEMENT SERVICES, TRAVEL SERVICES  

E-Print Network [OSTI]

Revision Date: 02.10.2009 MATERIAL & DISBURSEMENT SERVICES, TRAVEL SERVICES Web Travel Purpose: The web travel system is an electronic solution for departments to submit for approval and generate, and Travel Reimbursements. Web travel is also used in conjunction with the Central Airfare Billing System

Crews, Stephen

160

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

162

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

163

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

164

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

165

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

166

DATE: TO: FROM: SUBJECT:  

Broader source: Energy.gov (indexed) [DOE]

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

167

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

168

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

169

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

170

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

171

Date: Re: Department  

Broader source: Energy.gov (indexed) [DOE]

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

172

J DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

173

Procurement Directors DATE: TO:  

Broader source: Energy.gov (indexed) [DOE]

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

174

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

175

LSPE SAFE/ ARM SLIDE DATE 28 March 197  

E-Print Network [OSTI]

: ..'; I ~ ··,~ ' . LSPE SAFE/ ARM SLIDE NO. ATM-1088 REV. NO. PAGE OF- DATE 28 March 197 FAILURE/ ARM SLIDE FAILURE EVALUATION REPORT TABLE OF CONTENTS PURPOSE BACKGROUND DESCRIPTION OF FAILURE with Slides Having PAGI i DATE 0, Page 1 1 3 3 3 12 15 16 Larger Fillet Radius 16 6. 2 Slide Tests With 10

Rathbun, Julie A.

176

How to Write and Submit a Conference  

E-Print Network [OSTI]

How to Write and Submit a Conference Paper OWISE Graduate Seminar September 17, 2010 Jenna P to this audience? · What do abstracts and papers for this conference look like (check out past conference proceedings)? · Do you know anyone who has had a paper accepted for this conference? · Consider adding a co

Selmic, Sandra

177

Announcement (Submitted to `Photosynthesis Research, 2006)  

E-Print Network [OSTI]

1 Announcement (Submitted to `Photosynthesis Research, 2006) Advances in Photosynthesis, in Advances in Photosynthesis and Respiration (AIPH) Series, of The Structure and Function of Plastids, a book Rochaix, Michel Goldschmidt-Clermont and Sabeeha Merchant); and Volume 14 (Photosynthesis in Algae, edited

Govindjee "Gov"

178

Paleomagnetic Secular Variation (PSV), 137Cs, and Hg dating techniques  

E-Print Network [OSTI]

Portland State University Department of Geology #12;Hg-Mercury contamination dating http fission of Uranium-235 · Due to nuclear weapons testing · Highly water soluble (spreads quickly) · Half

Fountain, Andrew G.

179

Type Policy Title Here Effective Date: [Insert Date  

E-Print Network [OSTI]

Type Policy Title Here Effective Date: [Insert Date] Policy Statement [Type Statement Text Here] Reason(s) for the Policy [Type Reason Text Here] Primary Guidance to Which This Policy Responds [Type Primary Policy Here ­ If there is NOT a Primary Policy indicate that] Responsible University Office

Salzman, Daniel

180

Absolute Time Radiometric Dating: the source of the dates on  

E-Print Network [OSTI]

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale Radiometric.g. uranium to lead. · The parent element is radioactive, the daughter element is stable. · The decay rate nucleosynthesis. Common Radioactive Elements, Parents and Daughters · Carbon-14, C14 Nitrogen-14, N14 · Uranium

Kammer, Thomas

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

How can I view submitted materials? | OpenEI Community  

Open Energy Info (EERE)

view submitted materials? Home > Groups > 2014 Geothermal Case Study Challenge Submitted by NickL on 6 May, 2014 - 07:41 1 answer Points: 0 For various reasons, you may want to...

182

How do I submit challenge materials? | OpenEI Community  

Open Energy Info (EERE)

submit challenge materials? Home > Groups > 2014 Geothermal Case Study Challenge Submitted by NickL on 2 May, 2014 - 14:09 1 answer Points: 0 Challenge submission details are...

183

NOVA Portal: Submit VASP Jobs to Carver via the Web  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NOVA Portal: Submit VASP Jobs to Carver via the Web NOVA Portal: Submit VASP Jobs to Carver via the Web May 11, 2012 by Francesca Verdier (0 Comments) NOVA is an experimental web...

184

Final Report - Effects of High Spinel and Chromium Oxide Crystal Contents on Simulated HLW Vitrification in DM100 Melter Tests, VSL-09R1520-1, Rev. 0, dated 6/22/09  

SciTech Connect (OSTI)

The principal objective of the work was to evaluate the effects of spinel and chromium oxide particles on WTP HLW melter operations and potential impacts on melter life. This was accomplished through a combination of crucible-scale tests, settling and rheological tests, and tests on the DM100 melter system. Crucible testing was designed to develop and identify HLW glass compositions with high waste loadings that exhibit formation of crystalline spinel and/or chromium oxide phases up to relatively high crystal contents (i.e., > 1 vol%). Characterization of crystal settling and the effects on melt rheology was performed on the HLW glass formulations. Appropriate candidate HLW glass formulations were selected, based on characterization results, to support subsequent melter tests. In the present work, crucible melts were formulated that exhibit up to about 4.4 vol% crystallization.

Kruger, Albert A.; Matlack, K. S.; Kot, W.; Pegg, I. L.; Chaudhuri, M.; Lutze, W.

2013-11-13T23:59:59.000Z

185

Strategic Plan Submitted to the Secretary  

Broader source: Energy.gov (indexed) [DOE]

4 Volume 1, Number 3 4 Volume 1, Number 3 In This Issue * Executive Order Update * $1 Million for Manhattan Project Preservation * 2004 DOE Cultural Resources Forum * ES&H Cultural Resources Update * FPO Site Visits * Oppenheimer and the Manhattan Project Event * Museum Notes * Save America's Treasures * Featured Photo: Oak Ridge, 1949 Strategic Plan Submitted to the Secretary The strategic plan for history and heritage resources that Secretary Abraham directed the Federal Preservation Officer to prepare has been submitted and is under review. Following the December 2, 2003, briefing at which the Secretary directed preparation of a plan to make recommendations for the full range of the Department's history and heritage resources, FPO Skip Gosling and Deputy FPO Terry Fehner put together a small planning

186

Submitting Organization Hongyou Fan Sandia National Laboratories  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

 2007 R&D 100 Award Entry Form  Submitting Organization Hongyou Fan Sandia National Laboratories Advanced Materials Laboratory 1001 University Boulevard SE Albuquerque, NM 87106, USA 505-272-7128 (phone) 505-272-7336 (fax) hfan@sandia.gov AFFIRMATION: I affirm that all information submitted as a part of, or supplemental to, this entry is a fair and accurate represen- tation of this product. Submitter's signature_______________________________ Earl Stromberg Lockheed Martin Aeronautics Mail Zone 2893 PO Box 748 Fort Worth, TX 76101, USA 817-763-7376 (phone) 817-762-6911 (fax) Earl.W.Stromberg@lmco.com Self-Assembling Process for Fabricating Tailored Thin Films This simple, economical nanotechnology coating process enables the development of nanoparticle thin films

187

WIPP - How to submit a FOIA request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to submit a Freedom of Information Act (FOIA) request FOIA requests to the U.S. Department of Energy Carlsbad Field Office (CBFO) may be submitted by request form, letter, fax, or e-mail. You may contact CBFO at the following address: George W. Hellstrom Freedom of Information Act/Privacy Act Public Liaison U.S. Department of Energy Carlsbad Field Office P.O. Box 3090 4021 National Parks Highway Carlsbad, New Mexico 88221-3090 foialiaison@ FOIA requests may be mailed or faxed to (505) 234-7025, e-mailed to the Freedom of Information Act /Privacy Act Public Liaison, or submitted electronically using the FOIA Request form. Clearly mark the envelope, fax, or e-mail "Freedom of Information Act request." Describe the records you are requesting as completely and accurately as possible, and provide your name, address, and telephone number. A telephone call between the requester and the FOIA contact person may be necessary to clarify a request and expedite processing time.

188

Conference dates 1620 April 2012  

E-Print Network [OSTI]

Conference dates 16­20 April 2012 Location The Square Conference Centre Brussels, Belgium www/nanotechnologies Mark your Calendar #12;Conference dates 16­20 April 2012 The Square Conference Centre Brussels, Belgium success, Photonics Europe 2012 will again feature choice conferences and plenary presentations

Jahns, Jürgen

189

April 26, 2004 Northwest Power and Conservation Council Submitted to  

E-Print Network [OSTI]

for the Future Role of BPA in Power Supply. These comments are submitted on behalf of Alcoa Inc. which owns and necessary task of defining BPA's future role in power supply. Alcoa has joined with other BPA customers in submitting joint comments and also submits the following additional comments. 1. The list of "goals" for BPA

190

DATE: TO: FROM:  

Broader source: Energy.gov (indexed) [DOE]

175 175 July 30,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Security Clause, DEAR 952.204-2 SUMMARY: The DOE Security Clause, DEAR 952.204-2, was amended on May 18, 2009 to augment the background check requirement and to add a drug test requirement as prerequisites for processing a request for an access authorization (security clearance). Please check to ensure that all applicable contracts have been amended to include these updated requirements. Expect personnel security to return contractor requests for access authorizations that do not include the required information. A summary of the required information is attached. This Flash and its attachment will be available online within a day, at the following

191

Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for  

Broader source: Energy.gov (indexed) [DOE]

6/2/11 6/2/11 Comments to the following DOE Proposed Rules: 10 CFR Part 431 [Docket No. EERE-2010-BT-TP-0036] RIN 1904-AC38 Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Automatic Commercial Ice Makers Submitted by: Mary C. Howe, President, Howe Corporation, Chicago, IL 60642 mchowe@howecorp.com CORPORATION 1650 N Elston Ave * Chicago, IL. 60642 * (773) 235-0200 * Fax (773) 235-0269 * E-mail: howeinfo@howecorp.com 2 Item 1 - DOE also requests comment on the proposal that the use of amended test procedure be required upon the effective date of any test procedure final rule, 30 days after publication in the Federal Register. In the case of the addition of continuous production remote condenser ACIM's, the outside testing

192

A NEW TEST METRIC AND A NEW SCAN ARCHITECTURE FOR EFFICIENT VLSI TESTING  

E-Print Network [OSTI]

A NEW TEST METRIC AND A NEW SCAN ARCHITECTURE FOR EFFICIENT VLSI TESTING A DISSERTATION SUBMITTED. To overcome the difficulty and cost of VLSI testing, we need to search for better testing techniques. Chip testing can be classified into two categories: production testing and characterization testing

Stanford University

193

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

194

Advanced Powertrain Research Facility Document Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

195

Advanced Powertrain Research Facility Document Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

196

EPA Tier2 Submit Software Webpage | Open Energy Information  

Open Energy Info (EERE)

Software Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: EPA Tier2 Submit Software Webpage Author United States Environmental Protection...

197

Submitted to LLB highlights 2011 Doxorubicin Loaded Magnetic Polymersomes  

E-Print Network [OSTI]

Submitted to LLB highlights 2011 Doxorubicin Loaded Magnetic Polymersomes: Theranostic Nanocarriers for cancer diagnostics and treatment open the field of "theranostics", i.e. combination of imaging

198

Idaho Statement of Completion for Submitting Proof of Beneficial...  

Open Energy Info (EERE)

Proof of Beneficial Use (DWR Form 217). 112009. Retrieved from "http:en.openei.orgwindex.php?titleIdahoStatementofCompletionforSubmittingProofofBeneficialUse(DWR...

199

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to  

E-Print Network [OSTI]

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to: _________________________________ Class Time: __________ - __________ _________ Test Date: _______________________________ Time allotted): ____________________________ INSTRUCTOR PROCEDURES: 1. Please deliver tests to WYLY TOWER 318 at least 24 hours PRIOR to test time

Selmic, Sandra

200

DATE:  

Broader source: Energy.gov (indexed) [DOE]

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

202

DATE:  

Broader source: Energy.gov (indexed) [DOE]

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

203

DATE  

Broader source: Energy.gov (indexed) [DOE]

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

204

DATE  

Broader source: Energy.gov (indexed) [DOE]

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

205

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

206

DATE  

Broader source: Energy.gov (indexed) [DOE]

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

207

DATE  

Broader source: Energy.gov (indexed) [DOE]

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

208

DATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

209

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

210

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

211

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

212

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

213

DATE  

Broader source: Energy.gov (indexed) [DOE]

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

214

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

215

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

216

DATE  

Broader source: Energy.gov (indexed) [DOE]

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

217

DATE  

Broader source: Energy.gov (indexed) [DOE]

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

218

DATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

219

DATE  

Broader source: Energy.gov (indexed) [DOE]

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

220

DATE  

Broader source: Energy.gov (indexed) [DOE]

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

222

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

223

DATE  

Broader source: Energy.gov (indexed) [DOE]

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

224

DATE  

Broader source: Energy.gov (indexed) [DOE]

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

225

Date:  

Office of Legacy Management (LM)

1.45 10.06 0.99 0.04786 2.85 0.13 1.30 Froude Number Flow Type Notes Messages 0.66 Subcritical 0.64 Subcritical 0.41 Subcritical 0.58 Subcritical 0.48 Subcritical 0.42...

226

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

understand what is required to be a nuclear supplier. 6. Gen IV Fabrication Centric Roadmap The objective of this program is to develop a succinct document that will allow...

227

Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that Sandia contracts are settled for a reasonable amount and that no instances of fraud related to these contracts is apparent. We will not report on the adequacy of your...

228

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 E-2 IWFDP Volume 1 (Process Strategy) provides the basis for how the double-shell tanks (DST) will be used to stage and deliver waste feed to the WTP. This volume provides an...

229

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of approximately 55 Mgal 1 of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The Hanford Federal Facility...

230

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operations (such as preparation of chemical standards and sample analysis); and small-scale pilot projects (generally less than 2 years) frequently conducted to verify a...

231

DATE:  

Office of Legacy Management (LM)

(w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following...

232

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and repairing wastewater systems lines and connections that could impact the discharge to wastewater systems. 8. Drinking Water Contamination - Performing maintenance activities on...

233

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Release; Further Dissemination Unlimited By Janis D. Aardal at 1:25 pm, Jan 31, 2013 DOERL-2001-41 Revision 6 SITEWIDE INSTITUTIONAL CONTROLS PLAN FOR HANFORD CERCLA RESPONSE...

234

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

buildings"..., and Overarching EC INL-05-002 "Critical Infrastructure Protection (CIP) Program ... Justification: Removal of the interior walls and mezzanines will be a...

235

DATE:  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Corporations Section 743 Any Payment for the Election for a Federal Office or to a Political Committee Section 3003 Reporting on Conference Spending 2 The FAL addresses the...

236

DATE:  

Energy Savers [EERE]

Corporations * Section 735 Any Payment for the Election for a Federal Office or to a Political Committee * Section 742 Reporting on Conference Spending The FAL addresses the...

237

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Impact: Generating and Managing Waste - The proposed activity would generate scrap metal and industrial waste. Project personnel will contact Waste Generator Services (WGS) to...

238

DATE:  

Energy Savers [EERE]

Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement...

239

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

will rest on a new concrete foundation and house the necessary heating, ventilation and air conditioning (HVAC), electrical, life safety and communications systems but will not...

240

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233Th-232 contaminated materials (minor...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DATE:  

Broader source: Energy.gov (indexed) [DOE]

Consolidated Appropriations Act, 2014, Pub. L. No. 113-76. SUMMARY: Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 provides implementing...

242

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building The INL must operate and maintain infrastructure and facilities to support the nuclear energy research, development, demonstration, and commercial application programs,...

243

DATE:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

es...A-i Appendix B Estimation of Selected Single-Shell Tank Heat Generation Rates...B-i RPP-RPT-54981, Revision 0 ii List of...

244

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing...

245

DATE:  

Office of Environmental Management (EM)

has been revised. The subject form has been posted on the DOE Financial Assistance web page on the Recipients Page under the Financial Assistance Forms and Information for...

246

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A. Project Title: Innovative Manufacturing Process for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing...

247

DATE  

Broader source: Energy.gov (indexed) [DOE]

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

248

DATE  

Broader source: Energy.gov (indexed) [DOE]

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

249

DATE  

Broader source: Energy.gov (indexed) [DOE]

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

250

Corrective Action Investigation Plan for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada (Rev. No.: 0) includes Record of Technical Change No. 1 (dated 9/17/2002)  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfills used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will concentrate on geophysical surveys to confirm the presence or absence of disposed waste within a CAS and verify the boundaries of disposal areas; penetrate disposal feature covers via excavation and/or drilling; perform geodetic surveys; and be used to collect both soil and environmental samples for laboratory analyses. Phase II will deal only with those CASs where a contaminant of concern has been identified. This phase will involve the collection of additional soil and/or environmental samples for laboratory analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

IT Corporation, Las Vegas, NV

2002-05-28T23:59:59.000Z

251

Radiokrypton dating finally takes off  

Science Journals Connector (OSTI)

...dating, based on the well-known radioactive decay...essentially has a single, well-mixed, and steady source, the...fortunately it works well for noble gases...Isolation Pilot Plant, New Mexico . J Contam Hydrol 160...radionuclides in Yellowstone geothermal gas emissions: A reconnaissance...

Werner Aeschbach-Hertig

2014-01-01T23:59:59.000Z

252

White Papers Submitted to the Technology Innovation Program  

E-Print Network [OSTI]

White Papers Submitted to the Technology Innovation Program interested parties to submit white papers describing an area of critical national need and how those needs-risk, high-reward R&D. White papers could discuss any area of critical national need of interest

Magee, Joseph W.

253

How to Submit a FOIA Request | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

to Submit a FOIA Request | National Nuclear Security Administration to Submit a FOIA Request | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Operations > NNSA Office of General Counsel > Freedom of Information Act (FOIA) > How to Submit a FOIA Request How to Submit a FOIA Request FOIA requests to the NNSA/Office of the General Counsel may be submitted in

254

National Electric Transmission Congestion Study 2012 - How to Submit  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study 2012 - How to National Electric Transmission Congestion Study 2012 - How to Submit Comments National Electric Transmission Congestion Study 2012 - How to Submit Comments You may submit written comments to Congestionstudy2012@hq.doe.gov or by mail to: Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW. Washington, DC 20585 The Department intends to use only data that is publicly available for this study. Accordingly, please do not submit information that you believe is or should be protected from public disclosure. DOE is responsible for the final determination concerning disclosure or nondisclosure of information submitted to DOE and for treating it in accordance with the DOE's Freedom of Information regulations (10 CFR 1004.11). All comments received by DOE

255

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA  

Broader source: Energy.gov (indexed) [DOE]

Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Submitting Environmental Impact Statements | Compliance and Enforcement | US EPA Jump to main content. National Environmental Policy Act (NEPA) Recent Additions | Contact Us Search: All EPA Compliance and Enforcement q You are here: EPA Home q Compliance and Enforcement q National Environmental Policy Act (NEPA) q Submitting Environmental Impact Statements Submitting Environmental Impact Statements q Amended EIS Filing System Guidelines (January 2011) q Where to Submit (or "File") an EIS q Filing an EIS--Draft, Final and Supplemental q EIS Filing Procedure for Continuity of Operations Plan (COOP) Events q Notice in the Federal Register q Time Periods Amended EIS Filing System Guidelines (January 2011)

256

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30, 2013 30, 2013 CX-010821: Categorical Exclusion Determination Manufacturing Process for Organic Light-Emitting Diode (OLED) Integrated Substrate CX(s) Applied: B3.6 Date: 07/30/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory July 30, 2013 CX-010771: Categorical Exclusion Determination Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) CX(s) Applied: B1.15 Date: 07/30/2013 Location(s): Idaho Offices(s): Nuclear Energy July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina

257

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6, 2009 6, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination Down Hole Seismic Source 68-SX-11 CX(s) Applied: B3.7, B5.12 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006664: Categorical Exclusion Determination Rocky Mountain Oilfield Testing Center Process Improvement Old Pipe Yard Clean Up

258

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 CX-006069: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011

259

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Broader source: Energy.gov (indexed) [DOE]

Testing Advanced Vehicle Testing Activity Maintenance Sheet for 2010 Ford Fusion VIN 3FADP0L32AR194699 Date Mileage Description Cost 1012009 5915 Changed oil and filter 28.77...

260

Fleet Testing Advanced Vehicle Testing Activities - 2010 Honda...  

Broader source: Energy.gov (indexed) [DOE]

Vehicle Testing Activity Maintenance Sheet for 2010 Honda Insight LX VIN JHMZE2H59AS011748 HEV Fleet Testing Date Mileage Description Cost 842009 5,752 Changed oil and filter...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

262

Save the Date - NTSF 2013  

Broader source: Energy.gov (indexed) [DOE]

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

263

Form:Testing Facility | Open Energy Information  

Open Energy Info (EERE)

registry, the form will be populated with that facility's fields and you may edit. Submit Retrieved from "http:en.openei.orgwindex.php?titleForm:TestingFacility&oldid67587...

264

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: _________ Roberta Brayer Approved by: _________________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP06 Revision 2 i TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Initial Conditions and Prerequisites 1 5. Testing Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices Appendix A - Handling Pad Test Data Sheet 8

265

2013 Chevrolet Volt - VIN 3929 - Advanced Vehicle Testing - Beginning...  

Broader source: Energy.gov (indexed) [DOE]

Voltage 3 : 3.00 V Thermal Management: Active - Liquid cooled BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 4,007 mi Date of...

266

2011 Hyundai Sonata Hybrid - vin 3539 Advanced Vehicle Testing...  

Broader source: Energy.gov (indexed) [DOE]

Pack Capacity: 5.3 Ah Cooling: ActiveCabin Air Pack Weight: 96 lb BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 5,730 mi Date of...

267

Submit a Buy American Complaint | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Action Center » Submit a Buy American Complaint Action Center » Submit a Buy American Complaint Submit a Buy American Complaint Buy American Resources Section 1605 of the American Recovery and Reinvestment Act of 2009 sets forth the Buy American requirements for recipients of Recovery Act financial assistance, including EECBG recipients. If you have reason to believe that a vendor or grant recipient is violating the Buy American Requirements of the Recovery Act, which apply to iron, steel, or manufactured goods in a public works project funded by DOE, please provide the information that you have in support of that belief to BuyAmericanComplaints@hq.doe.gov. EERE Buy American Guidance Report an Appliance Regulation Violation Report Fraud to the IG Submit a Buy American Complaint FAQs Related to the Recovery Act

268

Linking Models and Data on Vegetation Structure Submitted to  

E-Print Network [OSTI]

Linking Models and Data on Vegetation Structure Submitted to: Journal of Geophysical Research the original development of "Nachhaltigkeit" or in English "sustainability" with the Germans in the mid-18th

Moorcroft, Paul R.

269

MOTORIZED WINTER RECREATION IMPACTS ON SNOWPACK PROPERTIES Submitted by  

E-Print Network [OSTI]

THESIS MOTORIZED WINTER RECREATION IMPACTS ON SNOWPACK PROPERTIES Submitted by Jared Tucker Heath 2011 All Rights Reserved #12;ii ABSTRACT MOTORIZED WINTER RECREATION IMPACTS ON SNOWPACK PROPERTIES Winter recreation, consisting of snowshoeing, skiing, snowboarding, and snowmobiling, has been increasing

MacDonald, Lee

270

Abstract Submitted for the DPP07 Meeting of  

E-Print Network [OSTI]

Abstract Submitted for the DPP07 Meeting of The American Physical Society Sorting Category: 5-interface periodic-cylinder configuration. In this work, we per- form a stability scan over pressure and for a two

Hudson, Stuart

271

,~ Abstract Submitted to 1997 Denver X-Ray Conference  

E-Print Network [OSTI]

,~ Abstract Submitted to 1997 Denver X-Ray Conference Denver, Colorado -August 4-8, 1997 BNL-.64346 being distributed through the entire volume of the particle needs further investigation. *Work supported

Brookhaven National Laboratory

272

Abstract Submitted for the DPP97 Meeting of  

E-Print Network [OSTI]

Abstract Submitted for the DPP97 Meeting of The American Physical Society Sorting Category: 5 solve these problems. 1 This work supported by DoE Contract DE­AC02­76CH03073. Prefer Oral Session X

Hammett, Greg

273

Top U.S. Nuclear Official Commends Industry for Submitting 3rd...  

Energy Savers [EERE]

Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC Top U.S. Nuclear Official Commends Industry for Submitting...

274

Appropriate Acquisition Strategy PMLL Identifier: PMLL-2011-NNSS-RFS-388 (Source: User Submitted)  

Broader source: Energy.gov (indexed) [DOE]

Appropriate Acquisition Strategy Appropriate Acquisition Strategy PMLL Identifier: PMLL-2011-NNSS-RFS-388 (Source: User Submitted) Validator: Kevin Thornton, NNSA/NSO Date: 2/14/2011 Contact: Robert Platoni/702-295-0815 Statement: The selection of an acquisition strategy that is appropriate for current market conditions, funding constraints, and project scope can result in more competitive bidding and lower bid prices. Discussion: The scope of this project was to construct two new fire stations to replace existing outdated facilities. The project was originally planned as two separate projects to be constructed in two different fiscal years using a design/bid/build acquisition strategy. The funding profile was appropriate for this type of strategy. In FY2004, Congress directed that the two projects be

275

Management of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted)  

Broader source: Energy.gov (indexed) [DOE]

of Peripheral Scope of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted) Validator: Dawn Harder Date: 12/16/2010 Contact: 505-845-6314 Statement: A common understanding of the project scope is essential for project success. Additionally, agreeing on the treatment of scope that is similar but not part of the project scope is also necessary. Discussion: The Sandia Site Office (SSO) and Sandia National Laboratories (SNL) disagreed on the treatment of two separate scopes of work and their inclusion into the Heating Systems Modernization (HSM) Project. The first scope involved the early shutdown of the steam plant. During the initial planning and design, the Engineer and the SNL Plant Engineers studied the effect(s) expected to be experienced at the steam plant as load was successively removed during the planned three years

276

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2010 1, 2010 CX-004065: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11 Date: 10/01/2010 Location(s): Palo Alto, California Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004064: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Holbrook, Arizona Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004063: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System

277

Updated: September, 2012 Intent to Hold FPM Course/Test  

E-Print Network [OSTI]

Updated: September, 2012 FORM A Intent to Hold FPM Course/Test Which course are you conducting? (check only one) 2-day course 1-day course Test only Re-Test only Test & Re-Test Food Handlers What date(s) are you conducting the training/testing? ______________________________ (mm

278

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

279

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 CX-005656: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Flint, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005655: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Wakarusa, Indiana Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005653: Categorical Exclusion Determination Pilot-Scale Testing Evaluating the Effects of Bromine Additions on Continuous Mercury Monitors at Low Mercury Concentrations CX(s) Applied: A9, B3.6 Date: 04/28/2011

280

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22, 2010 22, 2010 CX-001991: Categorical Exclusion Determination Northern New Mexico College - El Rito Campus CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-001990: Categorical Exclusion Determination Highlands University CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): Las Vegas, New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000926: Categorical Exclusion Determination "Feedstock to Tailpipe Initiative": Kansas Biofuels Production, Testing and Certification Laboratory CX(s) Applied: B3.6 Date: 02/22/2010 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 30, 2013 May 30, 2013 CX-010215: Categorical Exclusion Determination Laufer Wind Group National Wind Technology Center Structure Lighting Tests CX(s) Applied: B1.31, B5.15 Date: 05/30/2013 Location(s): Colorado Offices(s): Golden Field Office May 30, 2013 CX-010483: Categorical Exclusion Determination Man Hole Cover Assembly Replacement CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2013 CX-010508: Categorical Exclusion Determination Cloud County Community College Wind Turbine CX(s) Applied: A9, A11, B3.14 Date: 05/29/2013 Location(s): Kansas Offices(s): Golden Field Office May 29, 2013 CX-010480: Categorical Exclusion Determination Development of a Multi-User Network Testbed for Wide-Area Monitoring and

282

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 CX-008950: Categorical Exclusion Determination Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 08/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008949: Categorical Exclusion Determination Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations CX(s) Applied: A9, B3.6 Date: 08/13/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008884: Categorical Exclusion Determination Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 13, 2012 CX-008879: Categorical Exclusion Determination Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project

283

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6, 2009 6, 2009 CX-000541: Categorical Exclusion Determination Checkout of StreamPro ADCP (Acoustic Doppler Current Profiler) Velocity Meter CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination

284

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 5, 2010 January 5, 2010 CX-000802: Categorical Exclusion Determination Transmission Electron Microscopy Specimen Preparation by Electropolishing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000803: Categorical Exclusion Determination Production of Hazardous Enhanced Chemical Cleaning Sludge Simulants CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000804: Categorical Exclusion Determination 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

285

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

14, 2013 14, 2013 CX-010493: Categorical Exclusion Determination Determining Distribution Coefficients by Surface-Enhanced Raman Spectroscopy (SERS) CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010492: Categorical Exclusion Determination Permeation Testing Metals, Ceramics, and Polymers CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010282: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): New Jersey Offices(s): National Energy Technology Laboratory May 14, 2013 CX-010281: Categorical Exclusion Determination

286

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

12, 2011 12, 2011 CX-006468: Categorical Exclusion Determination Testing Subcontractor for Fenestration System Energy Performance Rating Development and Research CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006466: Categorical Exclusion Determination Deep/Shallow Well Laboratory CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office August 11, 2011 CX-006478: Categorical Exclusion Determination

287

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 CX-004740: Categorical Exclusion Determination Install Amonix Panels at National Solar Thermal Test Facility CX(s) Applied: B5.1 Date: 11/23/2010 Location(s): New Mexico Office(s): Sandia Site Office November 23, 2010 CX-004719: Categorical Exclusion Determination Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install) CX(s) Applied: B1.7 Date: 11/23/2010 Location(s): Louisiana Office(s): Strategic Petroleum Reserve Field Office November 23, 2010 CX-004592: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A9, A11, B3.6 Date: 11/23/2010 Location(s): Wooster, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory

288

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 CX-005332: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7 Date: 02/28/2011 Location(s): Wichita, Kansas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 28, 2011 CX-005329: Categorical Exclusion Determination Fluid-Bed Testing of GreatPoint Energy's Direct Oxygen Injection Catalytic Gasification Process CX(s) Applied: B3.6 Date: 02/28/2011 Location(s): Grand Forks, North Dakota Office(s): Fossil Energy, National Energy Technology Laboratory February 28, 2011 CX-005301: Categorical Exclusion Determination Alaska-Tribal Energy Program-The Tatitlek Corporation CX(s) Applied: A9, A11 Date: 02/28/2011 Location(s): Tatitlek, Alaska Office(s): Energy Efficiency and Renewable Energy

289

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

290

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2011 3, 2011 CX-006354: Categorical Exclusion Determination Extraction and Recovery of Lignin and Hemicellulose from Biomass CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006353: Categorical Exclusion Determination Grout Formulation and Variability Testing CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006349: Categorical Exclusion Determination Ohio-City-Cuyahoga Falls CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 06/23/2011 Location(s): Cuyahoga Falls, Ohio Office(s): Energy Efficiency and Renewable Energy June 23, 2011 CX-006347: Categorical Exclusion Determination

291

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2012 November 29, 2012 CX-009633: Categorical Exclusion Determination Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 28, 2012 CX-009552: Categorical Exclusion Determination Central Vermont Recovered Biomass Facility CX(s) Applied: B5.20 Date: 11/28/2012 Location(s): Vermont Offices(s): Golden Field Office November 28, 2012 CX-009547: Categorical Exclusion Determination Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project')

292

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15, 2011 15, 2011 CX-006137: Categorical Exclusion Determination B39 Cellular Repeater Installation CX(s) Applied: B1.7 Date: 06/15/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006136: Categorical Exclusion Determination Field Testing of Low Impact Oil Field Roads CX(s) Applied: B3.7 Date: 06/15/2011 Location(s): Webb County, Texas Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006079: Categorical Exclusion Determination Topic 7A, Emergency Backup Power Systems CX(s) Applied: A9, B5.1 Date: 06/15/2011 Location(s): Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 14, 2011 CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable

293

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9, 2010 9, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6 Date: 10/18/2010 Location(s): Reno, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004290: Categorical Exclusion Determination Greenfield Community College - Geothermal Project CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

294

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7, 2012 7, 2012 CX-009375: Categorical Exclusion Determination A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data CX(s) Applied: A9 Date: 09/17/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009374: Categorical Exclusion Determination Development of a Carbon Dioxide Chemical Sensor for Downhole Carbon Dioxide Monitoring in Carbon Sequestration CX(s) Applied: B3.6 Date: 09/17/2012 Location(s): New Mexico Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009373: Categorical Exclusion Determination Testing of an Advanced Dry Cooling Technology for Power Plants CX(s) Applied: B3.6 Date: 09/17/2012 Location(s): North Dakota Offices(s): National Energy Technology Laboratory September 17, 2012

295

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 22, 2012 February 22, 2012 CX-007929: Categorical Exclusion Determination Midwest Region Alternative Fuels Project: Black Hills Energy Compressed Natural Gas Infrastructure CX(s) Applied: B5.22 Date: 02/22/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007928: Categorical Exclusion Determination Game Changing Technology of Polymeric-Surfactants for Tertiary Oil CX(s) Applied: A9, B3.6 Date: 02/22/2012 Location(s): Indiana Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007927: Categorical Exclusion Determination Compressor Testing of Next Generation Refrigeration Lubricants CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007926: Categorical Exclusion Determination

296

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2012 1, 2012 CX-008288: Categorical Exclusion Determination Decommissioning of the Appliance Testing and Evaluation Center in Morgantown CX(s) Applied: B3.6 Date: 05/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008287: Categorical Exclusion Determination Technology Integration Program CX(s) Applied: A9 Date: 05/01/2012 Location(s): CX: none Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008286: Categorical Exclusion Determination Technology Integration Program CX(s) Applied: A9, A11, B3.6 Date: 05/01/2012 Location(s): Tennessee Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008285: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22

297

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7, 2012 7, 2012 CX-009619: Categorical Exclusion Determination Dissolution of Sludge Constituents in Glycolate-Containing 2H Evaporator Rad Feed Solution CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009618: Categorical Exclusion Determination Defense Threat Reduction Agency (DTRA) Radar Testing CX(s) Applied: B3.1 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009617: Categorical Exclusion Determination Gas Mass Spectrometry CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009432: Categorical Exclusion Determination Transformational Approach to Reducing the Total System Costs of Building

298

Nanoparticle toxicity testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nanoparticle toxicity testing Nanoparticle toxicity testing 1663 Los Alamos science and technology magazine Latest Issue:November 2013 All Issues » submit Nanoparticle toxicity testing Assessing the potential health hazards of nanotechnology March 25, 2013 Robot In the search for more accurate and efficient techniques to evaluate the health hazards of nanoparticles, Los Alamos researchers are developing artificial human tissues and organs to replace animal test subjects. A new approach to toxicity testing under development at Los Alamos uses artificial tissue and artificial organs instead of animal testing Manufactured nanoparticles such as buckyballs and carbon nanotubes, used in products ranging from sunscreens to solar panels, are proliferating so quickly that safety testing for potential health hazards-similar to those

299

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

300

test1 - Datasets - OpenEI Datasets  

Open Energy Info (EERE)

test1 This is only a test Data and Resources TEST1.1com TESTING More info Go to resource doe test1 test2 test Additional Info Field Value Catalog OpenEI Origination Date 2014-11-12...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Rough Ride Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NTP005 NTP005 Revision 2 Effective December 1, 2004 Electric Vehicle Rough Road Course Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: _______________ Donald B. Karner ©2004 Electric Transportation Applications All Rights Reserved Procedure ETA-NTP005 Revision 2 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Testing Activity Requirements 6 6.0 Glossary 12 7.0 References 14 Appendices Appendix A - Electric Vehicle Rough Road Test Data Sheet 15

302

Test Cell Location  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mazda 3 i-Stop Mazda 3 i-Stop Test Cell Location APRF- 4WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional- Start Stop Vehicle Dynamometer Input Document Date 11/20/2012 Advanced Powertrain Research Facility Test weight [lb] 3250 Vehicle Dynamometer Input Document Date 11/20/2012 Revision Number 1 Advanced Powertrain Research Facility Test weight [lb] Target A [lb] 3250 31.2 Target B [lb/mph] Target C [lb/mph^2] 0.462 0.014 Test Fuel Information - Vehicle equipped with with i-Stop package - Manual Transmission - All tests completed in ECO mode - EPA shift schedule modified based on vehicle shift light activity Revision Number 1 Notes: Fuel type EPA Tier II EEE Gasoline Test Fuel Information - Vehicle equipped with with i-Stop package

303

Hydrogen Station Test Device Design and Fabrication | Department...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Station Test Device Design and Fabrication Hydrogen Station Test Device Design and Fabrication October 2, 2014 - 3:02pm Addthis Open Date: August 26, 2014 Requesting...

304

AHAM - CCE Overview and Update, dated 06/07/2011  

Broader source: Energy.gov (indexed) [DOE]

AHAM AHAM CCE Overview and Update June 7, 2011 1 2 3 4 5 6 Agenda Certified Ratings Definitions Certification Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory) for * May elect to use a third-party (e.g., certified laboratory) for testing and certification purposes. * Must determine certified ratings through testing.

305

AHAM - CCE Overview and Update, dated 06/07/2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AHAM AHAM CCE Overview and Update June 7, 2011 1 2 3 4 5 6 Agenda Certified Ratings Definitions Certification Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory) for * May elect to use a third-party (e.g., certified laboratory) for testing and certification purposes. * Must determine certified ratings through testing.

306

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 1, 2010 October 1, 2010 CX-004064: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Holbrook, Arizona Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004063: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Wilsonville, Alabama Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004062: Categorical Exclusion Determination Strategy to Accelerate United States Transition to Electric Vehicles

307

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Broader source: Energy.gov (indexed) [DOE]

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

308

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Revision 1 Effective June 2008 Battery Capacity and Depth of Discharge Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP003 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

309

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Revision 1 Effective June 2008 Traction System Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP002 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

310

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 Revision 1 Effective June 2008 Electromagnetic Interference and Susceptibility Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP004 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

311

PFBC HGCU Test Facility. Technical progress report: Third Quarter, CY 1993  

SciTech Connect (OSTI)

This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

Not Available

1993-10-01T23:59:59.000Z

312

Absolute Time Radiometric Dating: the source  

E-Print Network [OSTI]

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale #12 as an element changes to another element, e.g. uranium to lead. · The parent element is radioactive · Carbon-14, C14 Nitrogen-14, N14 · Uranium-235, U235 Lead-207, Pb207 · Potassium-40, K40 Argon-40, Ar40

Kammer, Thomas

313

Jordan J. Gerth A dissertation submitted in partial fulfillment of  

E-Print Network [OSTI]

Sky Cover By Jordan J. Gerth A dissertation submitted in partial fulfillment of the requirements, Professor, Atmospheric and Oceanic Sciences #12;#12;i Sky Cover Jordan J. Gerth1 Department of Atmospheric, Madison, Wisconsin 1 Corresponding author address: Jordan Gerth, Cooperative Institute for Meteorological

Wisconsin at Madison, University of

314

Instructions for Submitting Document to OpenNet | Department...  

Broader source: Energy.gov (indexed) [DOE]

Document to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't...

315

Submitted to Statistical Science Mapping Energy Landscapes of  

E-Print Network [OSTI]

(ELMs) which characterize and visualize an energy function with a tree structure, in which each leafSubmitted to Statistical Science Mapping Energy Landscapes of Non-Convex Learning Problems Maria-convex in various model spaces and thus are difficult to analyze. In this paper, we compute Energy Landscape Maps

Zhu, Song Chun

316

SUBMITTED TO JSAC, FEB. 2005 1 Distributed Interference Compensation for  

E-Print Network [OSTI]

SUBMITTED TO JSAC, FEB. 2005 1 Distributed Interference Compensation for Wireless Networks Jianwei Huang, Randall Berry, Michael L. Honig Abstract We consider a distributed power control scheme for wireless ad hoc networks, in which each user announces a price that reflects compensation paid by other

Kuzmanovic, Aleksandar

317

MCP Submitted Targeting the Human Cancer Pathway Protein  

E-Print Network [OSTI]

MCP Submitted Targeting the Human Cancer Pathway Protein Interaction Network by Structural Genomics for targeting co-functioning proteins by structural genomics projects. 2 byonMay28,2008www of the human genome sequence (4-6), the use of automated sequencing technology, and the development

Gerstein, Mark

318

Green Fund Report, Submitted to the Green University Planning Committee,  

E-Print Network [OSTI]

and final report submitted, January 2012 5 2011 January Compost Visioning Workshop (PGPIRG) Original budget potential study (Steve Helle, Geoff de Ruiter) Original budget: $5000 Final cost: $5000 · completed- progress 11 2012 May University Farmers' Market communication (UFM) Original budget: $5522 Final cost

Owens, Philip

319

Energy Minimization Accelerated with FPGAs Thesis submitted in partial fulfillment  

E-Print Network [OSTI]

implementation for that part of the computation. iv #12;Contents 1 Introduction 1 1.1 What is Energy Minimization between Energy Minimization and Molecular Dynamics . . . . 7 2.3 Content of Energy Minimization Terms' & $ % Energy Minimization Accelerated with FPGAs Huaxin Dai Thesis submitted in partial

Herbordt, Martin

320

SUBMITTED TO GRL 1 Thermal Anisotropies in the Solar Wind  

E-Print Network [OSTI]

SUBMITTED TO GRL 1 E Thermal Anisotropies in the Solar Wind: vidence of Heating by Interstellar cyclotron instabilit s generated by newly created pickup ions and heats the thermal solar wind protons TO GRL 2 T Introduction he thermal anisotropy of the solar wind is the ratio between the temperatures p

Richardson, John

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Aluminum Removal from Photographic Waste Submitted to Dr. Tony Bi  

E-Print Network [OSTI]

Aluminum Removal from Photographic Waste Submitted to Dr. Tony Bi By: Kristen Favel, Tiffany Jung, and Kenny Tam CHBE 484 University of British Columbia April 15, 2009 #12;ii "Aluminum Removal from photographic waste has shown elevated levels of aluminum in the fixer, which exceed sewer discharge standards

322

Submitted to Operations Research manuscript OPRE-2009-09-406  

E-Print Network [OSTI]

the problem of making advance energy commitments for wind farms in the pres- ence of a storage device with conversion losses, mean-reverting price process, and an auto-regressive energy generation process from wind Programming, Energy History : This paper was first submitted on September 4, 2009 and has been revised and re

Powell, Warren B.

323

Vehicle arrived for disposal Date Disposal of Asset form approved (copy required) Date  

E-Print Network [OSTI]

Colour Engine (ltrs) Fuel (ulp/diesel) Transmission (auto/manual) Compliance date Kilometres Additions-BusinessSolutions@anu.edu.au Post auction report from Pickles received. Date (ie Sold at General Auction, passed-in etc) Cheque

Botea, Adi

324

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

325

Another test for notifications | OpenEI Community  

Open Energy Info (EERE)

Another test for notifications Home > Groups > Databus Notify me Submitted by Prusso on 26 June, 2013 - 11:05 2 answers Points: 0 yeah, I received it just fine. Deanhiller on 2...

326

Coherent testing and simulation of composite blade repair  

E-Print Network [OSTI]

COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1997 Major Subject: Mechanical Engineering COHERENT TESTING AND SIMULATION OF COMPOSITE BLADE REPAIR A Thesis by BRIAN GLENN MCNICHOLS Submitted to Texas A&M University In partial fulfillment of the requirements for the degree of MASTER...

McNichols, Brian Glenn

2012-06-07T23:59:59.000Z

327

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9, 2010 9, 2010 CX-004278: Categorical Exclusion Determination Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide CX(s) Applied: A9 Date: 10/19/2010 Location(s): Clarkstown, New York Office(s): Fossil Energy, National Energy Technology Laboratory October 19, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6

328

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 2, 2010 CX-001102: Categorical Exclusion Determination Recovery Act: Clemson University Wind Turbine Testing Facility CX(s) Applied: A9 Date: 03/02/2010 Location(s): North Charleston, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 2, 2010 CX-001037: Categorical Exclusion Determination Low-Cost Illumination Grade Light Emitting Diodes (LEDs) CX(s) Applied: B3.6, B5.1 Date: 03/02/2010 Location(s): San Jose, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 2, 2010 CX-001036: Categorical Exclusion Determination Solution Processable Transparent Conductive Hole Injection Electrode for Organic Light Emitting Diode (OLED) Solid State Lighting (Pennsylvania) CX(s) Applied: B3.6

329

Testing for Bacteria  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing for Bacteria Testing for Bacteria Name: Danielle Location: N/A Country: N/A Date: N/A Question: I have to do a science fair project. What I need to compare the relative bacterial levels in milk samples with different expiration dates. What can I use to test the bacteria? Please help! Replies: You want to see if there are bacteria present in milk of different expiration dates, and if so, what they do to the milk. So buy milk of different dates. You could test what effect storage temperature has on bacterial growth in milk. Use those different milk samples in their original package (don't open it!) and keep them at 37 degrees C, at room temperature, and in the fridge (measure how cold that is) for say 48 hrs.Then open the bottle or pack and see what happened to the milk. Do you see differences? Can you explain them? If you open the milk before the experiment you may get bacteria into the milk that otherwise would not have been there. The experiment with the closed bottles will tell you what is better, storage of milk at room temperature, warm, or cold.

330

Clean Cities: Submitting Project Ideas for the Clean Cities National Parks  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitting Project Ideas for the Clean Submitting Project Ideas for the Clean Cities National Parks Initiative to someone by E-mail Share Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Facebook Tweet about Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Twitter Bookmark Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Google Bookmark Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Delicious Rank Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on Digg Find More places to share Clean Cities: Submitting Project Ideas for the Clean Cities National Parks Initiative on AddThis.com... Goals & Accomplishments

331

Winter Study Rebate Form 2012 Date______________________________ ID #________________________________  

E-Print Network [OSTI]

Winter Study Rebate Form 2012 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

332

Winter Study Rebate Form 2013 Date______________________________ ID #________________________________  

E-Print Network [OSTI]

Winter Study Rebate Form 2013 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

333

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

334

SAVE THE DATE!!! The Silicon Valley  

E-Print Network [OSTI]

SAVE THE DATE!!! The Silicon Valley 3rd Annual Social Innovation Leadership Forum 2014 (SILF 2014 towards a better tomorrow... Register for the event today! The Social Innovation Leadership Forum (SILF

Su, Xiao

335

Property:GEAReportDate | Open Energy Information  

Open Energy Info (EERE)

Pages using the property "GEAReportDate" Showing 1 page using this property. L Los Humeros III Geothermal Power Plant + 19 December 2013 + Retrieved from "http:en.openei.org...

336

Version Date: July 2012 COPYRIGHT & TRADEMARKS  

E-Print Network [OSTI]

WEB Clock Version Date: July 2012 #12;COPYRIGHT & TRADEMARKS Copyright © 1998, 2011, Oracle and Guide WEB Clock Page iii Table of Contents WEB Clock ........................................................................................................................ 1 WEB Clock Procedure

337

BESC Submits 32 Gene Disclosures for Patents | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

News Careers Work with ORNL About ORNL Visiting ORNL Events and Conferences Highlights Success Stories Contact Us Index Home | ORNL | Highlights SHARE BESC submits 32 gene disclosures for future patents July 01, 2012 Plant geneticist Wellington Muchero examines phenotypic traits of Populus transgenic lines grown in a greenhouse. The Bioenergy Science Center (BESC) at Oak Ridge National Laboratory (ORNL) is preparing invention disclosures for 32 different genes that can help improve the yield of ethanol from cellulosic biomass. These genes or their variants function to overcome recalcitrance-difficulty in breaking down cellulosic biomass to release sugars. Several members of ORNL's Biosciences Division are submitting disclosures: 16 genes by Wellington Muchero, 10 genes by Udaya Kalluri, and

338

Enter Date: Enter NVLAP Lab Code: NIST HANDBOOK 150-10 CHECKLIST  

E-Print Network [OSTI]

Enter Date: Enter NVLAP Lab Code: NIST HANDBOOK 150-10 CHECKLIST EFFICIENCY OF ELECTRIC MOTORS prescribed in NIST Handbook 150-10, Efficiency of Electric Motors. The Test Method Review Summary, which is used to review the laboratory's ability to perform Efficiency of Electric Motors test methods

339

NO. REV. NO. Systems Division DATE  

E-Print Network [OSTI]

-~ NO. REV. NO. EATM-15 PAGE OF ~ Systems Division DATE EASEP /PSEP Solar Panel Development Design+"'--.:L'_;;;J....;::::::..··-=·~::!!:!!!e::...._ K. Hsi #12;NO. REV. NO. EATM-15 EASEP/PSEP Solar Panel Development ~ Systems Division Design of the EASE-PSEP Solar Panel Array~PA::G:,:E:..::=l=~o:F~=2=7= DATE 20 Nov. 1968 1. 0 SUMMARY Electrical power

Rathbun, Julie A.

340

Instructions for Submitting Documents to OpenNet  

Broader source: Energy.gov (indexed) [DOE]

Submitting Documents to OpenNet Submitting Documents to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't already have one, go to the OpenNet web site at: http://www.osti.gov/opennet. 1. Click on the LOGIN link on the top right. 2. Read the information and check the "I agree..." box. 3. Click on the "Request data submission access..." link at the bottom of the page. 4. Fill out the form. One of the required fields is the Site Input Code field. This field provides a drop down list of DOE Sites. All users with the same Site Input Code can edit all the records for that site. If your Site Code is not in the list or you need a site code more specific to your office than those listed,

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

This form may be submitted to the EIA by mail, fax, e-mail, or secure file trans  

U.S. Energy Information Administration (EIA) Indexed Site

notice914.jsp" notice914.jsp" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"OMB No. 1905-0205" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Expiration Date: 05/31/2015" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Burden: 3 hours" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"MONTHLY NATURAL GAS PRODUCTION REPORT",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Version No.: 2011.001" "FORM EIA-914" "This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. For the sanctions and the provisions concerning the confidentiality of information submitted on this form, see the form instructions. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction."

342

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

343

CERTS Microgrid Laboratory Test Bed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submitted to IEEE Transactions on Power Delivery Submitted to IEEE Transactions on Power Delivery Abstract--. CERTS Microgrid concept captures the emerging potential of distributed generation using a system approach. CERTS views generation and associated loads as a subsystem or a "microgrid". The sources can operate in parallel to the grid or can operate in island, providing UPS services. The system can disconnect from the utility during large events (i.e. faults, voltage collapses), but may also intentionally disconnect when the quality of power from the grid falls below certain standards. CERTS Microgrid concepts were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations,

344

2014 NEJC Save the Date (Spanish) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2014 NEJC Save the Date (Spanish) 2014 NEJC Save the Date (Spanish) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

345

2014 NEJC Save the Date (English) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4 NEJC Save the Date (English) 2014 NEJC Save the Date (English) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

346

Presentations by Date | Merit Review Application  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

347

G3 students are to write a written progress report annually (suggested to be 2-3 pg in length), to be submitted to their advisor and their DAC, and used as the basis of a DAC committee meeting. This form acknowledges completion of  

E-Print Network [OSTI]

), to be submitted to their advisor and their DAC, and used as the basis of a DAC committee meeting. This form or plans; OR By presenting this form, I certify that my research Advisor and Chair of my DAC (ie, 2nd Signature / Date Dissertation Advisory Committee Members Advisor / First Reader (print

348

COS NUV TA1 Mirror Specification Date: December 8, 1999  

E-Print Network [OSTI]

Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling:........................................................................................ 3 3.4.3 Solvents

Colorado at Boulder, University of

349

COS NUV Grating Substrate Specification Date: August 20, 2001  

E-Print Network [OSTI]

Experiment Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling: ............................................................................................3 3.4.3 Solvents.........................................................................................................

Colorado at Boulder, University of

350

COS Coating Reflectivity Specification Date: August 2, 1999  

E-Print Network [OSTI]

Project Scientist, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center .................................................................................. 4 4.1.1 Solvents

Colorado at Boulder, University of

351

NO. REV. NO. LSPE THERMAL BATTERY TEST  

E-Print Network [OSTI]

NO. REV. NO. ATM 1086 LSPE THERMAL BATTERY TEST PAGE 1 OF DATE 2/25/72 Prepared by @c!_.e,~.~ ~P. Weir Approved by ~~---:J L. Lewis 5 #12;KC::Y, NO. LSPE THERMAL BATTERY TEST ATM 1086 2 PAGE OF DATE 2-52-72 Introduction The purpose of this ATM is to document the results of a Thermal Battery test for the Lunar Seismic

Rathbun, Julie A.

352

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

353

Computational Age Dating of Special Nuclear Materials  

SciTech Connect (OSTI)

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

354

Uniform Requirements for Manuscripts Submitted to Biomedical Journals  

Science Journals Connector (OSTI)

...Association, the Lancet, the Medical Journal of Australia, the New England Journal of Medicine, the New Zealand Medical Journal, the Tidsskrift for den Norske Laegeforening, the Western Journal of Medicine, and the Index Medicus. It is important to emphasize what these requirement do and do not imply. First... A small group of editors of general medical journals met informally in Vancouver, British Columbia, in 1978 to establish guidelines for the format of manuscripts submitted to their journals. The group became known as the Vancouver Group. Its requirements ...

International Committee of Medical Journal Editors

1997-01-23T23:59:59.000Z

355

DATE : NVLAP LAB CODE: NVLAP EFFICIENCY OF ELECTRIC MOTORS APPLICATION (REV. 2013-06-11) PAGE 1 OF 1  

E-Print Network [OSTI]

DATE : NVLAP LAB CODE: NVLAP EFFICIENCY OF ELECTRIC MOTORS APPLICATION (REV. 2013-06-11) PAGE 1 OF 1 EFFICIENCY OF ELECTRIC MOTORS TEST METHOD SELECTION LIST Instructions: Check each test method, Method B, on electric motors rated: ________ to ________ horsepower. ____ 24/M02* IEEE 114 Test Procedure

356

Flow Test At Rye Patch Area (DOE GTP, 2011) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Rye Patch Area (DOE GTP, 2011) Exploration Activity Details Location Rye Patch Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

357

Queen's University Environmental Health & Safety Date Issued  

E-Print Network [OSTI]

Queen's University Environmental Health & Safety Date Issued: November 27, 2013 Page No.: 1: The Department of Environmental Health & Safety 1.0 Introduction Queen's University acknowledges that the use of the Aboriginal culture and heritage. This standard operating procedure outlines the University's guidelines

Graham, Nick

358

Proposed Start Date: Title of Project  

E-Print Network [OSTI]

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

359

2011 TRAINING DATES January 10-12  

E-Print Network [OSTI]

2011 TRAINING DATES January 10-12 March 1-3 April 11-13 June 7-9 July 26-28 September 6-8 November: Tools and Functionality Professional Development Training Course OVERVIEW ArcGIS Desktop II: Tools come- first serve basis. · The workshop registration cost is $650. Payment is due prior to the training

360

CURRICULUM VITAE DATE PREPARED: September 5, 2007  

E-Print Network [OSTI]

CURRICULUM VITAE DATE PREPARED: September 5, 2007 PART I: General Information Education 2000- Organization for Human Brain Mapping (OHBM), Member HMS Curriculum Vitae Page 1 of 14 #12;2005- Society for Neuroscience (SFN), Member HMS Curriculum Vitae Page 2 of 14 #12;Part II: Research, Teaching

Boas, David

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

SAVE THE DATE! Saskatchewan Epidemiology Association  

E-Print Network [OSTI]

SAVE THE DATE! Saskatchewan Epidemiology Association Annual Fall Symposium & Workshop November 9 look forward to presentations by: Saskatchewan's Chief Medical Health Officer, Dr. Moira Mc of Regina ­ expert in climate change on the prairies Saskatchewan-based veterinarian ­ name to be announced

Saskatchewan, University of

362

Date ______________________ New York City Fire Department  

E-Print Network [OSTI]

familiar with the fire protection and fire suppression systems in the premises where heDate ______________________ New York City Fire Department Bureau of Fire Prevention 9 Metro received training in 3RCNY §10-01, Fire Code Sections 2701 - 2703 & 2706, the New C-14 study material

Jia, Songtao

363

Lorem & Ipsum [Insert Date \\ Issue] EQUINEBOOSTERSOFMSU  

E-Print Network [OSTI]

] Check out the MSU Colt Starting Class on Facebook! Keep up to date on the progress of our students the know-how and the connections with buyers across the United States. Headwaters Livestock, located in Three Forks, MT holds cattle sales every Monday and horse sales as announced. Special feeder, stock cow

Dyer, Bill

364

Flow Test At Maui Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Additional References Retrieved from "http:en.openei.orgw...

365

Flow Test At Chena Geothermal Area (Holdmann, Et Al., 2006) ...  

Open Energy Info (EERE)

Exploration Activity Details Location Chena Geothermal Area Exploration Technique Flow Test Activity Date 2005 - 2007 Usefulness useful DOE-funding Unknown Exploration Basis...

366

Announced United States nuclear tests, July 1945--December 1990  

SciTech Connect (OSTI)

This document lists chronologically and alphabetically by event name all nuclear tests conducted and announced by the United States from July 1945 to December 1990 with the exception of the GMX experiments. Discussion is included on test dates, test series, test yields, test locations, test types and purposes, test totals for Nevada Test Site (NTS) detection of radioactivity from NTS events, and categorization of NTS nuclear tests. Briefly discussed are agreements between the US and the Soviet Union regarding test banning. (MB)

Not Available

1991-01-01T23:59:59.000Z

367

Date of Birth Declaration Office of the Registrar  

E-Print Network [OSTI]

that shows your birth date. (Examples: Driver's License, Birth Certificate, Passport, court or other legalDate of Birth Declaration Office of the Registrar http://registrar.wisc.edu OFFICE USE ONLY Date Date of Birth Month: Day: Year: By my signature, I hereby claim that my correct day of birth

Yavuz, Deniz

368

Submit Your Home Energy Efficiency Questions Now for Earth Day Google+  

Broader source: Energy.gov (indexed) [DOE]

Submit Your Home Energy Efficiency Questions Now for Earth Day Submit Your Home Energy Efficiency Questions Now for Earth Day Google+ Hangout Submit Your Home Energy Efficiency Questions Now for Earth Day Google+ Hangout April 2, 2013 - 10:40am Addthis Submit a video question now for our Earth Day Google+ Hangout on home energy efficiency. | Graphic courtesy of Sarah Gerrity, Energy Department. Submit a video question now for our Earth Day Google+ Hangout on home energy efficiency. | Graphic courtesy of Sarah Gerrity, Energy Department. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs How can I participate? Submit a video question in advance. All you need to do is create a 30-second video, upload it to YouTube before April 16 and tag it with #askEnergy. Email your questions to newmedia@hq.doe.gov.

369

DATE: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH  

Broader source: Energy.gov (indexed) [DOE]

TO: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH 2005..19 March 1, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management STARS Conversion In April 2005, the Department will be converting to the new Standard Accounting and Reporting System (STARS). Department contractors and vendors will be encouraged to submit invoices early for goods or services to be delivered in March 2005 so they can be processed and paid by the end of the month. For such payment, invoices must be received by the Oak Ridge Financial Service Center not later than March 17,2005, and approving officials must provide their approvals by March 24,2005. Page 1 of2 To ensure a smooth transition, a one-time, limited delegation of Contracting Officer authority has been granted to the Director at Oak Ridge Financial Service Center for the purpose of signing

370

Program solicitation: Closing date, January 22, 1988  

SciTech Connect (OSTI)

DOE invites small business firms to submit proposals in this sixth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal R and D needs, increasing the commercial application of DOE-supported research results, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

Not Available

1987-01-01T23:59:59.000Z

371

Program solicitation. Closing date: March 1, 1995  

SciTech Connect (OSTI)

This document is a solicitation for small business to participate in innovation research. The Department of Energy (DOE) invites small business concerns to submit grant applications under this thirteenth annual solicitation for the Small Business Innovation Research (SBIR) program. Firms with strong research capabilities in science or engineering in any of the topic areas described in Appendix 1 are encouraged to participate. DOE will support high-quality research or research and development (R and D) on advanced concepts concerning important energy related scientific or engineering problems and opportunities that could lead to significant public benefit if the research is successful. Objectives of this program include increasing private sector commercialization of technology developed through DOE-supported R and D, stimulating technological innovation in the private sector, strengthening the role of small business in meeting Federal research and R and D needs, and improving the return on investment from Federally funded research for economic and social benefits to the Nation.

Not Available

1995-01-01T23:59:59.000Z

372

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

2010 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 #N/A Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

373

Company Company Code Fiscal Year Submission Date  

U.S. Energy Information Administration (EIA) Indexed Site

#N/A #N/A 2010 2010 EIA-28 Financial Reporting System Sch 5100 -- Page 1 of 1 Your are not required to respond to any Federally sponsored collection of information unless it displays a valid OMB number The Report is Mandatory Under Public Laws 95-91 and 93-275 Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law (See Section E of the General Instructions). For the provisions concerning the confidentiality of information submitted on this form, see Section D of the General Instructions. Public reporting burden for this collection of information is estimated to average approximately 500 hours per response, including the time of reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send

374

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

375

Research Highlights Sorted by Submission Date  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

376

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

377

Evaluation of the commercial FBR introduction date  

SciTech Connect (OSTI)

This report examines one criterion for introducing a commercial FBR: economic competitiveness with a Light Water Reactor (LWR). For this analysis, the commercial FBR is assumed to be the fifth-of-a kind replicate which represents an economically mature plant. This FBR is deemed economically competitive when its life-cycle energy cost is less than or equal to that of an LWR. Results of this analysis are used in a comparative analysis of alternative FBR development stategies. The strategies evaluated in these studies assume both 1000- and 1457-MWe FBRs. Since the capital costs per kilowatt, and therefore the energy costs, for these two FBR sizes are different, they will become economically competitive at different times. The probability density function for the 1457-MW(e) FBR has an expected value date or weighted average date of 2030, compared with 2033 for the probability density function for the 1000-MW(e) FBR.

White, M.K.; Merrill, E.T.

1981-09-01T23:59:59.000Z

378

Application of dating for searching geothermic sources  

Science Journals Connector (OSTI)

A Geothermical field is usually associated with a volcanic region and, therefore, with an abundance of volcanic glasses such as obsidians. The magmatic chambers constitute an excellent source of heat for a geothermical system. These chambers can be geologically identified from the surface by its recent volcanic products. Therefore, the geological age of the volcanic units is of great interest for a location of a worthwile thermal energy field. This paper presents some preliminary results of the ages obtained by dating obsidians.

L. Gutirrez-Negrin; A. Lpez-Martnez; M. Balczar-Garca

1984-01-01T23:59:59.000Z

379

NON RESIDENT ALIEN REQUIRED DOCUMENTS CLASSIFICATION REQUIRED ATTACHEMENTS MUST BE SUBMITTED WITH THE  

E-Print Network [OSTI]

NON RESIDENT ALIEN REQUIRED DOCUMENTS CLASSIFICATION REQUIRED ATTACHEMENTS MUST BE SUBMITTED WITH THE PAYROLL DOCUMENTS AND CITIZENSHIP STATUS FORM Permanent Resident Resident Alien Card, or I-551 Stamped

Adali, Tulay

380

FALSIFICATION OF INFORMATION POLICY Students registering and submitting resumes on MySpartanCareer.com certify  

E-Print Network [OSTI]

FALSIFICATION OF INFORMATION POLICY Students registering and submitting resumes on My in your MySpartanCareer.com profile, resume, or other application materials, MSU Career Services

Liu, Taosheng

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Position Description Report Run Date Aug 28 2013 10:03AM  

E-Print Network [OSTI]

developer in all phases of analysis, design, implementation, testing, and integration of cloud applicationsPosition Description Report Run Date Aug 28 2013 10:03AM Position Number: 02015821 Dept: IET APPLICATION DEVELOPMENT - 061419 Position: SENIOR CLOUD INTEGRATION LEAD Approved Payroll Title Code: 7289

California at Davis, University of

382

Position Description Report Run Date Aug 28 2013 2:46PM  

E-Print Network [OSTI]

of analysis, design, implementation, testing, and integration of applications supported by EAISPosition Description Report Run Date Aug 28 2013 2:46PM Position Number: TBD Dept: IET APPLICATION DEVELOPMENT - 061419 Position: APPLICATION DEVELOPER Approved Payroll Title Code: TBD Approved Payroll Title

California at Davis, University of

383

DEUTERONBEAMINTERACTIONWITH Li JET FOR A NEUTRONSOURCE TEST FACILITY*  

E-Print Network [OSTI]

DEUTERONBEAMINTERACTIONWITH Li JET FOR A NEUTRONSOURCE TEST FACILITY* A. Hassanein Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 USA The submitted manurript has teen authored Interaction with Li Jet for a NeutronSource Test Facility* A. Hassanein Argonne National Laboratory, Argonne

Harilal, S. S.

384

Home Energy Score: Analysis & Improvements to Date  

Broader source: Energy.gov (indexed) [DOE]

Home Energy Score: Home Energy Score: � Analysis & Improvements to Date � Joan Glickman Senior Advisor/Program Manager U.S. Department of Energy July 24, 2012 1 eere.energy.gov Presentation Overview 1) Background 2) Program Improvements 3) Analysis: Efficacy of Tool & Program - Asset Perturbations - Behavior Perturbations - Estimated Energy Use vs. Actual Energy Use (from utility bills) - Time Required for Assessment and Scoring - Blower Door Test Analysis 4) Next Steps & Ongoing Analysis 2 eere.energy.gov 1. Background � 3 eere.energy.gov Guiding Principles * Information must be credible, reliable, and replicable. * Information must be transparent and easy to understand. � * Implementation costs must be affordable. * Program must include effective quality assurance.

385

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

E-Print Network [OSTI]

of AEPSC. DTC Registered Procedure CERTS Microgrid Test PlanTarget Group: Assigned Procedure Review Date: 23 Feb. 2008document is to establish procedures for testing of the CERTS

Eto, Joseph H.

2008-01-01T23:59:59.000Z

386

HSPD-12 Implementation Status Report Updated Date:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

387

Submitted to Solar Energy (Nov. 2011) Complete article Accepted version (v1, Jul. 2012)  

E-Print Network [OSTI]

Submitted to Solar Energy (Nov. 2011) Complete article Accepted version (v1, Jul. 2012) 1 THE SG2-00725987,version1-16Oct2012 Author manuscript, published in "Solar Energy 88, 10 (2012) Pages 3072-3083" DOI : 10.1016/j.solener.2012.07.018 #12;Submitted to Solar Energy (Nov. 2011) Complete article

Paris-Sud XI, Université de

388

Incident Report An incident report should be submitted for any event involving  

E-Print Network [OSTI]

Incident Report An incident report should be submitted for any event involving: injury or illness fire explosion or implosion chemical exposure Minor cuts and scrapes need not be reported be reported. If a "near miss" might have had severe consequences, submit an incident report. You may also

Crawford, T. Daniel

389

Submitted for Publication to SOLAR ENERGY PRODUCING SATELLITE-DERIVED IRRADIANCES IN COMPLEX ARID TERRAIN  

E-Print Network [OSTI]

Submitted for Publication to SOLAR ENERGY PRODUCING SATELLITE-DERIVED IRRADIANCES IN COMPLEX ARID spectrum. #12;Submitted for Publication to SOLAR ENERGY In its simplest description the model amounts wavelengths in the visible spectral range (0.55-0.75 µm) corresponding to the peak of the solar radiation

Perez, Richard R.

390

Officer competency in the Texas Standardized Field Sobriety Testing Program: a quantitative study  

E-Print Network [OSTI]

OFFICER COMPETENCY IN THE TEXAS STANDARDIZED FIELD SOBRIETY TESTING PROGRAM: A QUANTITATIVE STUDY A Thesis by RODNEY JOSEPH MERKLEY Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE December 2002 Major Subject' Educational Human Resource Development OFFICER COMPETENCY IN THE TEXAS STANDARDIZED FIELD SOBRIETY TESTING PROGRAM: A QUANTITATIVE STUDY A Thesis by RODNEY JOSEPH MERKLEY Submitted to Texas...

Merkley, Rodney Joseph

2012-06-07T23:59:59.000Z

391

How to Submit a Privacy Act Request | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to Submit a Privacy Act Request How to Submit a Privacy Act Request Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Compilation of Systems of Records Energy Employees Occupational Illness Compensation Program Act (EEOICPA) How to Submit a Privacy Act Request Privacy Act Request Form .pdf file (99KB) Reference Links Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Privacy Act How to Submit a Privacy Act Request Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Privacy Act Request Form .pdf file (99KB) You may request your own Privacy Act records by submitting a request in

392

EIS-0396: Notice of Extension of Time to Submit Scoping Comments |  

Broader source: Energy.gov (indexed) [DOE]

Extension of Time to Submit Scoping Comments Extension of Time to Submit Scoping Comments EIS-0396: Notice of Extension of Time to Submit Scoping Comments Global Nuclear Energy Partnership In response to public requests, the Department of Energy (DOE) announces an extension of time to submit comments on the proposed scope, alternatives, and environmental issues to be analyzed in the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership (GNEP PEIS). Notice of Extension of Time to Submit Scoping Comments on the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership, DOE/EIS-0396 (April 2007) 72 FR 15871 More Documents & Publications EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis

393

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator  

E-Print Network [OSTI]

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator Amy Irish. This moderate to heavy crop will mature close predicted dates. Blocks with light croploads will mature 3 or 4

394

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

395

AHAM- CCE Overview and Update, dated 06/07/2011  

Broader source: Energy.gov [DOE]

This document is U.S. Department of Energy's presentation titled "AHAM - CCE Overview and Update", dated June 7, 2011.

396

2012 -2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network [OSTI]

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2012 - 2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

397

2013 -2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network [OSTI]

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2013 - 2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

398

Student ID Number Date of birth Cell Phone  

E-Print Network [OSTI]

Name Student ID Number Date of birth Cell Phone New Housing Student Current Housing Student All's phone Crime 2 Information about charges or crime convicted of Date of conviction Court convicted in Sentence received Probation dates Probation officer's name Probation officer's phone Consent: I authorize

Pantaleone, Jim

399

Title/Loc/Date: Slide # 1 Jo EllisMonaghan  

E-Print Network [OSTI]

Title/Loc/Date: Slide # 1 Jo Ellis­Monaghan e­mail: joellis@emba.uvm.edu website: http://academics.smcvt.edu/jellis­monaghan #12; Title/Loc/Date: Slide # 2 29(59,(:# . First some problems (network reliability, scheduling; Title/Loc/Date: Slide # 3 6RPH#3UHOLPLQDULHV# # 'HOHWLRQ

Ellis-Monaghan, Joanna

400

Range Creek Calibrated Dates Beta-202190  

E-Print Network [OSTI]

remains of a shallow pit structure. Testing revealed chunks of burned adobe, many with structural Boomgarden for comments and suggestions Figure 5 4. Results for Feature C Feature C (Figure 4) is the burned impressions, and burned beams above the unprepared floor. Testing also yielded 15 artifacts, mostly late stage

Provancher, William

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Test Procedure Waivers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance & Equipment Standards » Rulemakings & Notices » Test Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with the relevant test procedure. For this reason, the Department of Energy (DOE) considers petitions for waivers from test procedures under certain circumstances. In general, any interested party-typically a manufacturer-may submit a petition for a test procedure waiver for a basic model of a covered product

402

Conference Proceedings, 2011 Low Impact Development Symposium, Submitted, March 2012 Economic and Adaptation Benefits of Low Impact Development  

E-Print Network [OSTI]

Conference Proceedings, 2011 Low Impact Development Symposium, Submitted, March 2012 1 Economic.ballestero@unh.edu; web: www.unh.edu/unhsc/. #12;Conference Proceedings, 2011 Low Impact Development Symposium, Submitted

403

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

404

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

405

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

406

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

407

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

408

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

409

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

410

DOE-EA-1184 Date Prepared:  

Broader source: Energy.gov (indexed) [DOE]

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

411

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

412

Date centerdTimes New Roman  

Broader source: Energy.gov (indexed) [DOE]

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

413

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

414

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

415

Manuscript Submitted to Solar Energy 4/2002 A NEW OPERATIONAL SATELLITE-TO-IRRADIANCE MODEL DESCRIPTION AND VALIDATION  

E-Print Network [OSTI]

Manuscript Submitted to Solar Energy 4/2002 A NEW OPERATIONAL SATELLITE-TO-IRRADIANCE MODEL, OR, USA #12;Manuscript Submitted to Solar Energy 4/2002 ABSTRACT We present a new simple model zenith angle to account for first order solar #12;Manuscript Submitted to Solar Energy 4/2002 geometry

Perez, Richard R.

416

Submitted to the Journal of Nanoscience and Nanotechnology, 2001. Effects of Nanometer Thick Passivation Layers on the  

E-Print Network [OSTI]

Submitted to the Journal of Nanoscience and Nanotechnology, 2001. Effects of Nanometer Thick concerned with the #12;Submitted to the Journal of Nanoscience and Nanotechnology, 2001. fact that devices. These effects all give rise to stresses in the #12;Submitted to the Journal of Nanoscience and Nanotechnology

Espinosa, Horacio D.

417

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing sample, cover letter and three references  

E-Print Network [OSTI]

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing://merkley.senate.gov/services/internships/ To apply: submit cover letter, resume, writing sample (://wyden.senate.gov/constituents/internship.cfm To apply: submit cover letter, resume and application (available online) David Wu (OR-1) Application

Escher, Christine

418

POSTING DATE: 12/14/2012 REMOVAL DATE: 12/24/2012 An application or resume must be submitted on line for each position applied for, through the COLT Promotional Opportunities  

E-Print Network [OSTI]

TECHNICIAN R 16 $40122- 54568 SAS-DLS-Cell & DNA Repository, Busch Non-State funded. Under general guidance's degree in a scientific discipline. A combination of two years college-level science curriculum plus two in an appropriate science curriculum may be substituted for the experience in the above combination. Requires

Hanson, Stephen José

419

POSTING DATE: 08/23/2013 REMOVAL DATE: 09/03/2013 An application or resume must be submitted on line for each position applied for, through the COLT Promotional Opportunities  

E-Print Network [OSTI]

-002227 SECRETARIAL ASST III R 15 $38414- 52128 Housing Opers - Residence Life, Cook Non-State funded. Provides confidential and coordinating secretarial/clerical support and renders basic administrative staff assistance) Four years secretarial experience; b) One year college level study plus three years of any equivalent

Hanson, Stephen José

420

NEMA Lighting, CCE Overview and Update presentation, dated 05/25/2011.  

Broader source: Energy.gov (indexed) [DOE]

Lighting Lighting CCE Overview and Update May 25, 2011 1 2 3 4 5 6 Agenda Certified Ratings Definitions Certification Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A Manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory) for * May elect to use a third-party (e.g., certified laboratory) for testing and certification purposes. * Must determine certified ratings through testing.

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

This form may be submitted to the EIA by mail, fax, e-mail, or secure file trans  

U.S. Energy Information Administration (EIA) Indexed Site

5.5 or later or Netscape 4.77 or later. Send your surveys using this secure method at: https://signon.eia.doe.gov/upload/noticeoog.jsp" 5.5 or later or Netscape 4.77 or later. Send your surveys using this secure method at: https://signon.eia.doe.gov/upload/noticeoog.jsp" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"OMB No. 1905-0174" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Expiration Date: 12/31/2015" ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,"Version No.: 2013.01" "FORM EIA-782A" "REFINERS'/GAS PLANT OPERATORS' MONTHLY PETROLEUM PRODUCT SALES REPORT" "This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law. Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction. See Instructions for further details on the sanctions and the provisions concerning the confidentiality of information submitted on this form."

422

Kansas City Plant submits productivity savings under share-in-savings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kansas City Plant submits productivity savings under share-in-savings Kansas City Plant submits productivity savings under share-in-savings program | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Kansas City Plant submits productivity savings under ... Kansas City Plant submits productivity savings under share-in-savings program Posted By Gayle Fisher

423

Department of Energy Submits $23.6 Billion Spending Plan to Congress for  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Submits $23.6 Billion Spending Plan to Department of Energy Submits $23.6 Billion Spending Plan to Congress for FY'07 Department of Energy Submits $23.6 Billion Spending Plan to Congress for FY'07 March 16, 2007 - 10:55am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) today submitted the Department's $23.598 billion spending plan to Congress for Fiscal Year (FY) 2007, a $45 million (0.2%) increase over the FY'07 request, as a result of the FY'07 Continuing Resolution. The spending plan will allow DOE to continue making marked progress in achieving President Bush's goal of bringing more clean energy sources to market to help cut dependence on fossil fuels, increasing our energy and economic security and boosting competitiveness. The Continuing Resolution, signed by President Bush on

424

Preparing and Submitting a Phase I Letter of Intent | U.S. DOE Office of  

Office of Science (SC) Website

and Submitting a Phase I Letter of Intent and Submitting a Phase I Letter of Intent Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR/STTR Home About Funding Opportunity Announcements (FOAs) Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent Preparing a DOE SBIR/STTR Phase I Grant Application Useful Documents for Awardees Commercialization Assistance Other Resources Awards SBIR/STTR Highlights Reporting Fraud Contact Information Small Business Innovation Research and Small Business Technology Transfer U.S. Department of Energy SC-29/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-5707 F: (301) 903-5488 E: sbir-sttr@science.doe.gov More Information » Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent

425

Attachment to Policy Flash on New Procedures for Submitting Clause or Template Changes  

Broader source: Energy.gov (indexed) [DOE]

on New Procedures for Submitting Clause or Template on New Procedures for Submitting Clause or Template Changes The following are the new procedures for submitting requests to add new clauses or templates or to change existing clauses and templates (including local clauses and templates) in STRIPES: Note that we are not specifying a specific number of days for any step in the process until we have some statistics on how long this new process will take. ∗ Site Points of Contact (SPOCs) and Contract and Financial Assistance Policy Division (CFAPD) staff are the only individuals who can submit a request for a clause or template addition or revision to the STRIPES functional team. Requests from other than the SPOCs will not be reviewed. ∗ The new forms developed for the requests for clause and template additions or revisions

426

How to Submit a FOIA Request | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to Submit a FOIA Request How to Submit a FOIA Request Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request FOIA Request Form Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) How to Submit a FOIA Request Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Electronic FOIA Request Form Office of Science Integrated Support Center (ISC)

427

Solution to Submit Large Electronic Proposal Files Principal Investigator and Departmental Staff Procedures  

E-Print Network [OSTI]

Procedures Sponsored Projects Administration (SPA) now has a solution for large electronic proposal files Submission folder. They can only upload files. 9. Follow the normal procedures to advise SPA to submit the sponsor's procedures. #12;

Janssen, Michel

428

Academic Advisor Appeal Questionnaire To be submitted as part of Financial Aid Appeal Process  

E-Print Network [OSTI]

Academic Advisor Appeal Questionnaire To be submitted as part of Financial Aid Appeal Process: ________________________________________ THE FOLLOWING IS TO BE COMPLETED BY THE ACADEMIC ADVISOR PRIOR TO FINANCIAL AID APPEAL MEETING Advisor Name: __________________________________ Department: __________________________________ Advisor Telephone: ______________________________ Advisor E

429

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project  

E-Print Network [OSTI]

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative Project Study Abroad Service Learning Project Title

Huang, Haiying

430

Radiation Exposure Monitoring Systems Program Policy for Submitting of PII information  

Broader source: Energy.gov [DOE]

The REMS Program Policy for submitting of PII information in accordance with the Office of Environment, Health, Safety and Security (EHSS) under DOE Order 231.1B and the REMS Reporting Guide.

431

Safety Shoe and Insole Reimbursement Form Requisitioner: -Submit to supervisor for signature  

E-Print Network [OSTI]

Safety Shoe and Insole Reimbursement Form Requisitioner: - Submit to supervisor for signature. _________________________________________________ POSITION ____________________________________________________________________ DID YOU PURCHASE SAFETY TOES Safety Shoes or other footwear under the provisions outlined in the Collective Agreement

Sinnamon, Gordon J.

432

Commitcoin: Carbon dating commitments with bitcoin  

E-Print Network [OSTI]

Abstract. In the standard definition of a commitment scheme, the sender commits to a message and immediately sends the commitment to the recipient interested in it. However the sender may not always know at the time of commitment who will become interested in verifying it. Further, when the interested party does emerge, it could be critical to establish when the commitment was made. Employing a proof of work protocol at commitment time will later allow anyone to carbon date when the commitment was made, approximately, without trusting any external parties. We present CommitCoin, an instantiation of this approach that harnesses the existing processing power of the Bitcoin peer-to-peer network; a network used to mint and trade digital cash. 1 Introductory Remarks Consider the scenario where Alice makes an important discovery. It is important to her that she receives recognition for her breakthrough, however she would also like to keep it a secret until she can establish a suitable infrastructure for monetizing it. By forgoing publication of her discovery, she risks Bob independently making the same discovery and publicizing it as his own. Folklore suggests that Alice might mail herself a copy of her discovery and leave the letter sealed, with the postal services timestamp intact, for a later resolution time. If Bob later claims the same discovery, the

Jeremy Clark; Er Essex

433

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

434

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

435

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

436

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

437

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

438

EV Project Overview Report - Project to Date through December...  

Broader source: Energy.gov (indexed) [DOE]

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

439

SAVE THE DATE - 2015 National Environmental Justice Conference...  

Broader source: Energy.gov (indexed) [DOE]

Documents & Publications 2014 NEJC Save the Date (English) ITP Aluminum: Technical Working Group on Inert Anode Technologies Leadership Transition Program (LTP) Application Package...

440

PRINCIPAL INVESTIGATOR Last Name First Name Date Institution  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Funding Source Research Proprietary Non-proprietary (publication in open source or peer review journal expected) Objectives: Abstract: SCHEDULING Expected start date for...

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Preparing to Submit a License Application for Yucca Mountain  

SciTech Connect (OSTI)

In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region of the United States, approximately 100 miles (160 kilometers) northwest of Las Vegas (Figure 1). The location is remote from population centers, and there are no permanent residents within approximately 14 miles (23 km) of the site. Overall, Nye County has a population density of about two persons per square mile (two persons per 2.5 square km); in the vicinity of Yucca Mountain, it is significantly less. Yucca Mountain is a series of north-south-trending ridges extending approximately 25 miles (40 km), and consists of successive layers of fine-grained volcanic tuffs, millions of years old, underlain by older carbonate rocks. The alternating layers of welded and nonwelded volcanic tuffs have differing hydrologic properties that significantly impact the manner in which water moves through the mountain. The repository horizon will be in welded tuff located in the unsaturated zone, more than 1,000 feet (300 meters) above the water table in the present-day climate, and is expected to remain well above the water table during wetter future climate conditions. Future meteorology and climatology at Yucca Mountain are important elements in understanding the amount of water available to potentially interact with the waste.

W.J. Arthur; M.D. Voegele

2005-03-14T23:59:59.000Z

442

Flow Test At Jemez Pueblo Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

GTP) Exploration Activity Details Location Jemez Pueblo Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011)...

443

Flow Test At Crump's Hot Springs Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Details Location Crump's Hot Springs Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011)...

444

Flow Test At Silver Peak Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Additional References Retrieved from "http:en.openei.orgw...

445

Flow Test At Steamboat Springs Area (Combs, Et Al., 1999) | Open...  

Open Energy Info (EERE)

Exploration Activity Details Location Steamboat Springs Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References Jim Combs, John...

446

Flow Test At Fish Lake Valley Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Additional References Retrieved from "http:en.openei.orgw...

447

Flow Test At Newberry Caldera Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Exploration Activity Details Location Newberry Caldera Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011)...

448

Random Testing versus Partition Testing.  

E-Print Network [OSTI]

?? The difference between Partition Testing and Random Testing has been thoroughlyinvestigated theoretically. In this thesis we present a practical study ofthe differences between random (more)

Oftedal, Kristian

2011-01-01T23:59:59.000Z

449

Revision Level: 03 Revision Date: 10/21/13  

E-Print Network [OSTI]

required for all collector types. However, the form is generic in nature so many fields will not apply to your particular collector. Therefore not all fields in this application will be filled out. Where): The information submitted with this application has been reviewed by me and is true and correct to the best of my

450

Drug Testing for New Clearance Holders  

Broader source: Energy.gov (indexed) [DOE]

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

451

Drug Testing for New Clearance Holders  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

452

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network [OSTI]

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification Archery

Williams, Gary A.

453

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network [OSTI]

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of 0 (no knowledge) to 3_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Grether, Gregory

454

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network [OSTI]

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Williams, Gary A.

455

Computer Engineering Graduate Handbook Dated: February 06, 2014  

E-Print Network [OSTI]

Computer Engineering Graduate Handbook Dated: February 06, 2014 MASTER OF SCIENCE IN COMPUTER ENGINEERING Computer Engineering Program College of Engineering & Computer Science California State University-278-5987 Fax: 657-278-5804 http://www.fullerton.edu/ecs/cpe #12;Computer Engineering Graduate Handbook Dated

de Lijser, Peter

456

Form Date 4/4/01 Refrigerant Service Order Form  

E-Print Network [OSTI]

Recovery Unit ID # : Added Lbs oz Lbs oz Lbs oz Startup Charge Net Refrigerant Added: Lbs oz Parts UsedForm Date 4/4/01 Refrigerant Service Order Form Service ID: Owner: Work Order #: Building: Date: Issued: Completed: Equipment ID: Technicians: Location: Model: Manufact: Serial #: Refrigerant Type

Russell, Lynn

457

Revision Date 01.11.13 PROCUREMENT SERVICES -LOGISTICS  

E-Print Network [OSTI]

Revision Date 01.11.13 PROCUREMENT SERVICES - LOGISTICS Reading and Reconciling an ePro and MMD with your FACSID. Prerequisites: None Find Help: Email logistics_team@unc.edu #12;Procurement Services - Logistics Reading and Reconciling an ePro and MMD Statement Revision Date 01.11.13 Page 2 of 6 Departmental

Crews, Stephen

458

Dating Pleistocene Archeological Sites by Protein Diagenesis in Ostrich Eggshell  

Science Journals Connector (OSTI)

...loss than bone but were still depleted by 60% when the epimerization...I ratios and radiocarbon or uranium-series dates from each site...and A. J. T. Tull; and uranium-series dates were provided...Institute, National Institutes of Health, Bethesda, MD 20892. H...

A. S. Brooks; P. E. Hare; J. E. Kokis; G. H. Miller; R. D. Ernst; F. Wendorf

1990-04-06T23:59:59.000Z

459

An early date for cattle from Namaqualand, South Africa  

E-Print Network [OSTI]

An early date for cattle from Namaqualand, South Africa: implications for the origins of herding did cattle come to South Africa? Radiocarbon dates on a newly found cow horn indicates a time, the authors favour immigrants moving along a western route through Namibia. Keywords: South Africa

460

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

ICE Cleaning Test Report.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

16 16 FIELD DEMONSTRATION OF THE ICE 250 TM CLEANING SYSTEM AT THE ROCKY MOUNTAIN OILFIELD TESTING CENTER CASPER, WYOMING August 18-19, 1999 Date Published: October 5, 1999 J.L. Johnston L.M. Jackson PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY/ROCKY MOUNTAIN OILFIELD TESTING CENTER Work Performed Under Rocky Mountain Oilfield Testing Center (RMOTC) CRADA No. 99-009 TABLE OF CONTENTS Abstract.............................................................................................................................................1 Introduction.......................................................................................................................................1 Product Description ...........................................................................................................................1

462

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network [OSTI]

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration operating pressure (MOP) 5. De-humidifying (Te control) 6. Defrost funtions 7. Loss of charge detection (LOC control) 6. Defrost funtions 7. Loss of charge detection (LOC) 8. Bleed function 9. Sensor placement tips

Oak Ridge National Laboratory

463

Mobile Testing  

Science Journals Connector (OSTI)

Mobile apps are everywhere. Some apps entertain and others enable business transactions. Apps increasingly interact with complex IT landscapes. For example, a banking app on a mobile device acts as a front end that invokes services on a back-end server ... Keywords: mobile apps, mobile devices, software quality management, software testing, test automation, test strategy

Klaus Haller

2013-11-01T23:59:59.000Z

464

CEA … External Power Supplies, CCE Overview and Update presentation, dated June 28, 2011.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CEA - External Power CEA - External Power Supplies CCE Overview and Update June 28, 2011 1 2 3 4 5 6 Agenda Certified Ratings Basic Models and Design Families Manufacturer and Importer Enforcement Overview DOE's New Initiatives How to Submit Questions 2 | Building Technologies Program & General Counsel's Office of Enforcement eere.energy.gov Manufacturer Explanation A manufacturer * Is the domestic manufacturer or an importer. * May produce equipment at multiple facilities in various locations with the same model characteristics. * May group individual models into basic models at the manufacturer's discretion. * May elect to use a third party (e g certified laboratory or * May elect to use a third-party (e.g., certified laboratory or foreign OEM) for testing and certification submission.

465

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

466

Suggested Format for Submitting Frequency Data Requests to the Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Suggested Format for Submitting Frequency Data Requests to the Department of Energy Suggested Format for Submitting Frequency Data Requests to the Department of Energy This document provides a suggested format for 1710 - 1755 MHz wireless industry licensees to submit their data requests to the Department of Energy (DOE). Wireless licensees may use alternate formats, but should ensure that they indicate which DOE frequency assignments are being addressed by identifying the National Telecommunications and Information Administration (NTIA) Government Master File (GMS) Agency Serial Number. This is a unique identifier for each frequency assignment and will be in the format "DOE xxxxxx" where the "x's" will be numbers. XYZ Wireless Company requests the release of technical performance data related to the

467

How to Submit a Request for a PARS II Account | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account How to Submit a Request for a PARS II Account The account access process for PARS II relies on the Department of Energy's MIS Application Gateway system to verify the requestor's identity and to approve his/her request for access to a specific DOE Headquarters application, such as PARS II. Once approved by the MIS Application Gateway, the PARS II Help Desk Administrator will assign a new PARS II account to the requestor. Please follow the steps listed below to apply for a PARS II account. 1. If the federal employee or contractor does not already have an account with the Department of Energy's MIS Application Gateway, then the requestor must apply for an account and be approved by a local federal sponsor. To

468

Submitting the Report Deliverable via E-Link | Scientific and Technical  

Office of Scientific and Technical Information (OSTI)

Basics » DOE Reporting Requirements Basics » DOE Reporting Requirements Submitting the Report Deliverable via E-Link Print page Print page Email page Email page DOE Financial Assistance Recipients and Non-Major Site/Facility Management Contractor should use the AN 241.3 to submit scientific/technical reports electronically. No username or password is needed to submit the AN 241.3 or report deliverable. DOE awardees complete the web form AN 241.3 with just a few required pieces of information as indicated on the form in red font preceded by an asterisk. Instructions are linked at the top of the AN 241.3 and also at the data field level for each field. Set the browser to accept all cookies before starting the submission process. Be sure to input the DOE contract number accurately. Do not enter

469

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined  

Broader source: Energy.gov (indexed) [DOE]

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC November 28, 2007 - 4:45pm Addthis RICHMOND, VA - The U.S. Department of Energy (DOE) Assistant Secretary for Nuclear Energy Dennis Spurgeon today commended Dominion North Anna, LLC (Dominion) for submission of a combined Construction and Operating License (COL) application to the Nuclear Regulatory Commission (NRC) for construction of a new nuclear power plant in the United States. Dominion's application seeks approval to build and operate one General Electric-Hitachi Economic Simplified Boiling Water Reactor (ESBWR) at its

470

ARM - Procedure for Submitting Science and Research Products to the Data  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DocumentationProcedure for Submitting Science and Research DocumentationProcedure for Submitting Science and Research Products to the Data Archive Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation Plan Data Product Registration and Submission Reading netCDF and HDF Data Files Time in ARM netCDF Data Files Data Archive Documentation ARM Archive's Catalog of Data Streams (Updated monthly) Access to Historical ARM Data More on Understanding and Finding ARM Data Data Quality Problem Reporting Procedure for Submitting Science and Research Products to the Data Archive The Principal Investigator (PI) establishes contact with an ARM Translator to describe the data product. The Translator collects enough information to describe the PI Product within the Translator group; thereby resulting in assignment of the

471

Submit Your Ideas for the NY Energy Data Jam | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam Submit Your Ideas for the NY Energy Data Jam June 19, 2013 - 11:03am Q&A What idea would you present at the Data Jam? Join the Conversation Addthis Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Applications powered by open energy data were on display at the Energy Datapalooza in June 2012. | Photo by Sarah Gerrity, Energy Department. Alex Cohen Alex Cohen Senior Digital Information Strategist How can I participate? Even if you cannot attend in person, we still want you to participate. Help us by starting the conversation. Email us at newmedia@hq.doe.gov and tell us your idea. Tweet questions to @ENERGY with the hashtag #EnergyJam.

472

Fatigue tests of under-strenghth timber railroad bridge stringers  

E-Print Network [OSTI]

OF SCIENCE December 2002 Major Subject: Civil Engineering FATIGUE TESTS OF UNDER-STRENGTH TIMBER RAILROAD BRIDGE STRINGERS A Thesis by CHRISTOPHER RYAN BORCHERS Submitted to Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE Approved as to style and content by: G T. Fry (Chair of Committee) iedz cki of Departme Anne M. Raich (Member) rry L. Kohutek (Member) December 2002 Major Subject: Civil Engineering ABSTRACT Fatigue Tests of Under...

Borchers, Christopher Ryan

2002-01-01T23:59:59.000Z

473

I HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S)  

Office of Legacy Management (LM)

HEHORANDIJH HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S) -------- lyaa * ------------------------ currwlt * ~e.Gd. ------------------------ Owner contacted Ja Yes 0 no; if ym, date contact=d--~~~?~~-2--- :TY+E OF OPERATION --------- - ---- Research & Development 0 Facility Type Production scale testing Pi lot Scale Bench Scale Process Theoretical Studies *i Sample & &balysis a Hanuf ??cturing a University 0 Research Organization 0 Sov~rnment Sponsored Facjlity a Other --------------------- I *l IPr~oduction Q Di8poklKtorage ?? rrimo cl Other information (i.e., cost 0 +bcontractor + fixed fem. unit price, ?? Purchase Order time 81 material, ?? tc) , ---------------------------- kontract,Purchame Order # kJ -?!a se -fiti & ~~~-~~~~~~~~~~--=~~-=------~ ----------w--mm -- E!!me~IEJ!L~E~~~~:

474

America's Wind Testing Facilities | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Wind Testing Facilities Wind Testing Facilities America's Wind Testing Facilities Addthis National Wind Technology Center - Colorado 1 of 7 National Wind Technology Center - Colorado The first of 4 towers is lifted as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-15 13:53 National Wind Technology Center - Colorado 2 of 7 National Wind Technology Center - Colorado Workers use a giant crane for lifting the blade assembly as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-22 12:06 Wind Technology Testing Center - Boston 3 of 7 Wind Technology Testing Center - Boston

475

Abstracts submitted for the thirty-first annual meeting, Division of Plasma Physics, November 13--17, 1989  

SciTech Connect (OSTI)

This report contains abstracts of papers that are submitted for the 31st annual meeting of the Division of Plasma Physics, November 13--17, 1989. (LSP)

Not Available

1989-09-01T23:59:59.000Z

476

IODP Manuscript Submission Instructions This document contains guidelines for submitting manuscripts to the Proceedings of the Integrated  

E-Print Network [OSTI]

IODP Manuscript Submission Instructions This document contains guidelines for submitting approved for review, the manuscript is assigned a tracking number. Please refer to the manuscript tracking

477

MHK Technologies/BOLT Lifesaver | Open Energy Information  

Open Energy Info (EERE)

Fred Olsen s BOLT Lifesaver wave energy converter is ultimately capable of producing clean and efficient electricity Technology Dimensions Device Testing Date Submitted...

478

E-Print Network 3.0 - autoimmune diseases submitted Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 > >> 1 Please mark these dates in your calendars For more details, please visit AAN website: www.autoantibodynetwork.com Summary: Combination and Clinical Significance ...

479

ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012  

Broader source: Energy.gov (indexed) [DOE]

- February 3, 2012 ENERGY STAR® is a joint program of the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) with a dual focus on energy and cost savings. These goals are reached through a combination of increasing customer awareness, partnering with over 15,000 private and public sector organizations and driving widespread technological advances in energy efficiency. ENERGY STAR recognizes three paths to increased daily energy efficiency: bringing to market new energy-efficient products, constructing efficient new homes and commercial buildings, and improving the efficiency of existing homes, commercial buildings and industrial facilities. In 2010, DOE launched a pilot program to verify the energy efficiency and water-use characteristics of

480

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Science Undergraduate Laboratory Internships (SULI) SULI Home Eligibility Benefits Participant Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page At the submission deadline (shown in red) the application system will close, and no materials will be accepted after the submission deadline has passed. The Application System closes at 5:00 PM Eastern Time. SULI Internship Term: Spring 2014 Summer 2014* Fall 2013 On-line Application Opens August 6, 2013 October 18, 2013 May 1, 2013 Applications Due October, 1, 2013 5:00 PM ET January 10, 2014 5:00 PM ET June 12, 2013 5:00 PM ET Offer Notification Period Begins on or around October, 15, 2013 January 20, 2014 June 24, 2013

Note: This page contains sample records for the topic "testing date submitted" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81: Categorical Exclusion Determination 81: Categorical Exclusion Determination Solar Instructor Training Network - Midwest Provider CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Wisconsin Offices(s): Golden Field Office January 27, 2012 CX-007880: Categorical Exclusion Determination Evergreen State Solar Partnership CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Washington Offices(s): Golden Field Office January 27, 2012 CX-007879: Categorical Exclusion Determination Wasatch SunShot Streamlining and Simplifying Solar CX(s) Applied: A9, A11 Date: 01/27/2012 Location(s): Utah Offices(s): Golden Field Office January 27, 2012 CX-007878: Categorical Exclusion Determination Texas Solar Collaboration to Streamline and Enable An Increase in Photovoltaic Capacity CX(s) Applied: A9, A11 Date: 01/27/2012

482

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2013 3, 2013 CX-010294: Categorical Exclusion Determination Building For Re-Roofing Project CX(s) Applied: B1.23, B2.1, B2.5 Date: 05/03/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010292: Categorical Exclusion Determination Modification to the Petrography Laboratory CX(s) Applied: B2.3, B3.6 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010291: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory May 3, 2013 CX-010289: Categorical Exclusion Determination Interstate Electrification Improvement CX(s) Applied: B5.1 Date: 05/03/2013 Location(s): Texas

483

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 CX-009047: Categorical Exclusion Determination New Drainage Near E-004 Basin CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009046: Categorical Exclusion Determination Pad 16 Perimeter Paving CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2012 CX-009007: Categorical Exclusion Determination Northeast Provider of Solar Photovoltaic Instructor Training CX(s) Applied: A9, A11, B5.16 Date: 08/08/2012 Location(s): New York Offices(s): Golden Field Office August 8, 2012 CX-009045: Categorical Exclusion Determination Machining and Fabrication in 723-A CX(s) Applied: B3.6 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

484

Save Energy, Save Date Night | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy, Save Date Night Energy, Save Date Night Save Energy, Save Date Night February 11, 2013 - 1:42pm Addthis Saving energy allows you to spend that money elsewhere. Saving energy allows you to spend that money elsewhere. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy How can I participate? Follow these tips to save energy and money this Valentine's Day. Valentine's Day. For many couples, it means cards, flowers, and prix fixe candlelight dinners. It also means for many couples a hefty withdrawal at the ATM to express their love. Fortunately, there are ways to save money by saving energy - even during the date - so you can spend the money you save on the things that really matter to your sweetheart. Here are five easy tips for those couples out there who want to save energy, save

485

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22, 2010 22, 2010 CX-003179: Categorical Exclusion Determination Mentasta Traditional Council CX(s) Applied: A9, A11 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003178: Categorical Exclusion Determination Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/22/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 22, 2010 CX-003169: Categorical Exclusion Determination Mecklenburg County Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010 Location(s): Mecklenburg County, Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 22, 2010 CX-003167: Categorical Exclusion Determination South Boston Landfill Energy Project CX(s) Applied: B5.1 Date: 07/22/2010

486

STUDENT RECREATION CENTER FACILITY REQUEST Group Name: ____________________________ Today's Date: __________  

E-Print Network [OSTI]

STUDENT RECREATION CENTER FACILITY REQUEST � Group Name: ____________________________ Today's Date:____________________ Time of Event: Start ______ Finish ______ � Facility Requested: o Lockridge Arena ____ Recreational Gym. _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ By requesting the Colorado School of Mines Student Recreation Center, I acknowledge that the requested activity

487

Solar Activity Index: Validity Supported by Oxygen Isotope Dating  

Science Journals Connector (OSTI)

...CENTURIES OF CLIMATIC RECORD FROM CAMP CENTURY ON GREENLAND ICE SHEET, SCIENCE...sup> concentration in Greenland Camp Century ice core, correlation with solar...activity absolute age Arctic region Camp Century ice core dates general listing...

J. R. Bray

1970-05-01T23:59:59.000Z

488

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date  

E-Print Network [OSTI]

NUIN Individual Development Plans (IDP) Student Matriculation Year Advisor Date Progress during: Summary of Coursework Progress (The Advisor should complete this section) Student's progress in this area): #12;Summary of Research Progress (The Advisor should complete this section) Student's progress

Contractor, Anis

489

Home Energy Score: Analysis & Improvements to Date | Department...  

Broader source: Energy.gov (indexed) [DOE]

to Date, a presentation from the U.S. Department of Energy, by Joan Glickman Senior AdvisorProgram Manager, Home Energy Score, July 24, 2012. pilotanalysiswebinar7-24-12.pdf...

490

FIXED PRICE RESIDUAL FUNDS POLICY Policy dated March 29, 1999  

E-Print Network [OSTI]

FIXED PRICE RESIDUAL FUNDS POLICY Policy dated March 29, 1999 After completion of all deliverables required under a fixed-price award, after costs in fulfilling the requirements of the award have been

Weston, Ken

491

Due date assignment using ADRES and simulated annealing  

Science Journals Connector (OSTI)

In this paper, flowtime estimation and/or Due Date Assignment (DDA) is studied by making use of a statistical technique, namely Adaptive Response Rate Exponential Smoothing (ADRES) and Simulated Annealing (SA). Primary objective of this study is to compare accuracies of the Due Date Assignment Models (DDAMs). In order to achieve this objective, simulation models are constructed representing different shop load level and using different despatching rules. Case by case findings are summarised in this paper.

Adil Baykasoglu; Mustafa Gocken; Zeynep D. Unutmaz

2008-01-01T23:59:59.000Z

492

E-Print Network 3.0 - automated xml-based test Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

xml-based test Search Powered by Explorit Topic List Advanced Search Sample search results for: automated xml-based test Page: << < 1 2 3 4 5 > >> 1 Sem -Date Didactiquevaluation...

493

E-Print Network 3.0 - astm test method Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test method Search Powered by Explorit Topic List Advanced Search Sample search results for: astm test method Page: << < 1 2 3 4 5 > >> 1 DATE : NVLAP LAB CODE: CONSTRUCTION...

494

E-Print Network 3.0 - astm standard test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test Search Powered by Explorit Topic List Advanced Search Sample search results for: astm standard test Page: << < 1 2 3 4 5 > >> 1 DATE : NVLAP LAB CODE: CONSTRUCTION MATERIALS...

495

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

496

Property:NEPA ApplicationDate | Open Energy Information  

Open Energy Info (EERE)

ApplicationDate ApplicationDate Jump to: navigation, search Property Name NEPA ApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA ApplicationDate" Showing 25 pages using this property. (previous 25) (next 25) C CA-670-2010-107 + 17 December 2008 + D DOI-BLM-CA-ES-2013-002+1793-EIS + 17 February 2010 + DOI-BLM-ID-110-2009-3825-CE + 4 June 2009 + DOI-BLM-ID-220-2009-EA-3709 + 12 February 2009 + DOI-BLM-ID-I020-2012-0017-CX + 21 October 2011 + DOI-BLM-NM-L000-2012-0046-CX + 4 January 2012 + DOI-BLM-NV-B020-2008-0071-DNA + 21 February 2008 + DOI-BLM-NV-B020-2008-????-?? + 11 April 2008 + DOI-BLM-NV-B020-2008-????-CX + 29 September 2008 + DOI-BLM-NV-B020-2009-0030-CX + 11 December 2008 + DOI-BLM-NV-B020-2010-0106-CX + 15 December 2009 +

497

Property:NEPA DecisionDocumentDate | Open Energy Information  

Open Energy Info (EERE)

DecisionDocumentDate DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the following 1 subproperty: D DOI-BLM-UT-W019-2011-0006-CX Pages using the property "NEPA DecisionDocumentDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 18 December 2007 + C CA-170-02-15 + 21 February 2002 + CA-650-2005-086 + 3 June 2006 + CA-670-2010-107 + 26 May 2010 + CA-670-2010-CX + 27 January 2010 + CA-96062042 + 31 May 2000 + D DOE-EA-1621 + 23 September 2008 + DOE-EA-1676 + 2 December 2009 + DOE-EA-1733 + 21 June 2010 + DOE-EA-1759 + 28 May 2010 + DOE-EA-1849 + 22 August 2011 + DOI-BLM-CA-C050-2009-0005-EA + 11 September 2009 +

498

Study on an automatic sorting system for Date fruits  

Science Journals Connector (OSTI)

Abstract In the present study, a machine vision based, online sorting system was developed, the aim being to sort Date fruits (Berhee CV.) based at different stages of maturity, namely Khalal, Rotab and Tamar to meet consumers demands. The system comprises a conveying unit, illumination and capturing unit, and sorting unit. Physical and mechanical features were extracted from the samples provided, and the detection algorithm was designed accordingly. An index based on color features was defined to detect Date samples. Date fruits were fed on a conveyor belt in a row. When they were at the center of the cameras field of view, a snapshot was taken, the image was processed immediately and the maturity stage of the Date was determined. When the Date passed the sensor, positioned at the end of the conveyor belt, a signal was sent to the interface circuit and an appropriate actuator, driven by a step motor, was actuated, leading the Date toward an appropriate port. For validation of proposed system performance, entire samples were again sorted by experts visually. Detection rate of the system for Tamar and Khalal was satisfactory. Although the detection rate was insufficient for the Rotab stage, there was no a significant difference between system accuracy and that obtained by the experts. The speed of image processing system was 0.34s. System capacity was 15.45kg/h.

Razieh Pourdarbani; Hamid Reza Ghassemzadeh; Hadi Seyedarabi; Fariborz Zaare Nahandi; Mohammad Moghaddam Vahed

2013-01-01T23:59:59.000Z

499

Property:NEPA RevisedApplicationDate | Open Energy Information  

Open Energy Info (EERE)

RevisedApplicationDate RevisedApplicationDate Jump to: navigation, search Property Name NEPA RevisedApplicationDate Property Type Date This is a property of type Date. Pages using the property "NEPA RevisedApplicationDate" Showing 19 pages using this property. D DOI-BLM-CA-ES-2013-002+1793-EIS + 5 June 2012 + DOI-BLM-NV-C010-2010-0006-EA + 16 November 2009 + DOI-BLM-NV-C010-2010-0010-EA + 15 October 2009 + DOI-BLM-NV-C010-2011-0016-EA + 15 March 2011 + DOI-BLM-NV-C010-2012-0050-EA + 14 February 2012 + DOI-BLM-NV-C010-2012-0051-EA + 1 December 2011 + DOI-BLM-NV-C010-2012-0069-CX + 9 August 2012 + DOI-BLM-NV-C010-2012-0070-CX + 27 July 2012 + DOI-BLM-NV-E030-2011-0017-CX + 2 March 2011 + DOI-BLM-NV-W010-2010-0004-EA + 23 November 2009 + DOI-BLM-NV-W010-2011-0001-EA + 4 June 2010 +

500

Instructions for Submitting Document to OpenNet | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Instructions for Submitting Document to OpenNet Instructions for Submitting Document to OpenNet Instructions for Submitting Document to OpenNet Requesting an account to submit documents to OpenNet If you plan to load documents to OpenNet, you must have an OpenNet Logon Name and Password. If you don't already have one, go to the OpenNet web site at: http://www.osti.gov/opennet. Click on the LOGIN link on the top right. Read the information and check the "I agree..." box. Click on the "Request data submission access..." link at the bottom of the page. Fill out the form. One of the required fields is the Site Input Code field. This field provides a drop down list of DOE Sites. All users with the same Site Input Code can edit all the records for that site. If your Site Code is not in the list or you need a site code more specific to your office than those