Powered by Deep Web Technologies
Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Activity Based Costing  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

1997-03-28T23:59:59.000Z

2

Evolving Utility Cost-Effectiveness Test Criteria  

Broader source: Energy.gov [DOE]

Presents an overview of tests done to evaluate the cost-effectiveness of energy efficiency program benefits.

3

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Broader source: Energy.gov (indexed) [DOE]

Testing Advanced Vehicle Testing Activity Maintenance Sheet for 2010 Ford Fusion VIN 3FADP0L32AR194699 Date Mileage Description Cost 1012009 5915 Changed oil and filter 28.77...

4

Fleet Testing Advanced Vehicle Testing Activities - 2010 Honda...  

Broader source: Energy.gov (indexed) [DOE]

Vehicle Testing Activity Maintenance Sheet for 2010 Honda Insight LX VIN JHMZE2H59AS011748 HEV Fleet Testing Date Mileage Description Cost 842009 5,752 Changed oil and filter...

5

Low Cost Exploration, Testing, And Development Of The Chena Geothermal  

Open Energy Info (EERE)

Cost Exploration, Testing, And Development Of The Chena Geothermal Cost Exploration, Testing, And Development Of The Chena Geothermal Resource Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Low Cost Exploration, Testing, And Development Of The Chena Geothermal Resource Details Activities (2) Areas (1) Regions (0) Abstract: The Chena Hot Springs geothermal field was intensively explored, tested, and developed without a wireline unit between October 2005 and August 2006. Due to the remote location of the project and its small size of 0.4 MW, it was necessary to perform the work without the geothermal industry infrastructure typically utilized in the 48 contiguous states. This could largely be done because some of the wells were capable of artesian flow at below boiling temperatures. The geology, consisting of

6

Low Cost Exploration, Testing, And Development Of The Chena Geothermal...  

Open Energy Info (EERE)

Low Cost Exploration, Testing, And Development Of The Chena Geothermal Resource Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Low Cost...

7

Low Cost Exploration, Testing, and Development of the Chena Geothermal...  

Open Energy Info (EERE)

Article: Low Cost Exploration, Testing, and Development of the Chena Geothermal Resource Abstract The Chena Hot Springs geothermal field was intensivelyexplored, tested, and...

8

The Impact of Test Suite Granularity on the Cost-Effectiveness of Regression Testing  

E-Print Network [OSTI]

The Impact of Test Suite Granularity on the Cost-Effectiveness of Regression Testing Gregg,pkallakug@cse.unl.edu ABSTRACT Regression testing is an expensive testing process used to validate software following modi cations. The cost-e ective- ness of regression testing techniques varies with characteris- tics of test

Rothermel, Gregg

9

The Impact of Test Suite Granularity on the CostEffectiveness of Regression Testing  

E-Print Network [OSTI]

The Impact of Test Suite Granularity on the Cost­Effectiveness of Regression Testing Gregg,pkallakug@cse.unl.edu ABSTRACT Regression testing is an expensive testing process used to validate software following modi#12;cations. The cost-e#11;ective- ness of regression testing techniques varies with characteris- tics of test

Rothermel, Gregg

10

Test-Cost Sensitive Classification on Data with Missing Values  

E-Print Network [OSTI]

Test-Cost Sensitive Classification on Data with Missing Values Qiang Yang, Senior Member, IEEE, Charles Ling, Xiaoyong Chai, and Rong Pan Abstract--In the area of cost-sensitive learning, inductive learning algorithms have been extended to handle different types of costs to better represent

Yang, Qiang

11

The Impact of Test Suite Granularity on the CostEffectiveness of Regression Testing  

E-Print Network [OSTI]

The Impact of Test Suite Granularity on the Cost­Effectiveness of Regression Testing Gregg,pkallakug@cse.unl.edu ABSTRACT Regression testing is an expensive testing process used to validate software following modifications. The cost­effective­ ness of regression testing techniques varies with characteris­ tics of test

Rothermel, Gregg

12

On Test Suite Composition and Cost-Effective Regression Testing Gregg Rothermel  

E-Print Network [OSTI]

On Test Suite Composition and Cost-Effective Regression Testing Gregg Rothermel , Sebastian Elbaum}@cse.unl.edu August 31, 2004 Abstract Regression testing is an expensive testing process used to re-validate software as it evolves. Various methodologies for improving regression testing processes have been explored, but the cost

Rothermel, Gregg

13

On Test Suite Composition and Cost-Effective Regression Testing. Gregg Rothermel  

E-Print Network [OSTI]

On Test Suite Composition and Cost-Effective Regression Testing. Gregg Rothermel , Sebastian Elbaum}@cse.unl.edu August 30, 2003 Abstract Regression testing is an expensive testing process used to re-validate software as it evolves. Various methodologies for improving regression testing processes have been explored, but the cost

Rothermel, Gregg

14

Advanced Vehicle Testing Activity: Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overview to Overview to someone by E-mail Share Advanced Vehicle Testing Activity: Overview on Facebook Tweet about Advanced Vehicle Testing Activity: Overview on Twitter Bookmark Advanced Vehicle Testing Activity: Overview on Google Bookmark Advanced Vehicle Testing Activity: Overview on Delicious Rank Advanced Vehicle Testing Activity: Overview on Digg Find More places to share Advanced Vehicle Testing Activity: Overview on AddThis.com... Home Overview Light-Duty Vehicles Medium- and Heavy-Duty Vehicles Publications Overview The marketplace for advanced transportation technologies and the focus, direction, and funding of transportation programs are continually changing. The Advanced Vehicle Testing Activity's "2005 Overview of Advanced Technology Transportation" (PDF 736 KB) gives the latest information about

15

1 Direct Cost Finding Interim Compliance Testing  

E-Print Network [OSTI]

of Sponsor Review Desk Review Site Visit Audit Agreed Upon Procedures Review #12;Audit Process Flow Planning & Definition Fieldwork & Testing Results & Reporting Closeout & Corrective Action Plan 5 REQUEST #12;Common · Preparation is key!! · Be cooperative · Documentation Standard Vary ­ Keep best documentation you can #12

16

Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Vehicle Testing and Demonstration Activities Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and Demonstration Activities 2009 DOE Hydrogen Program and Vehicle...

17

Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and...  

Broader source: Energy.gov (indexed) [DOE]

95% fleet cost split * 151 PHEVs in various testing stages, AVTA paid for 2 vehicles, 14 conversions and 60 data loggers. 15% DOE and 85% fleet cost split 7 FY08 PHEV Testing...

18

HEV Fleet Testing Advanced Vehicle Testing Activity  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Activity Activity Maintenance Sheet for 2007 Saturn Vue VIN # 5GZCZ33Z07S838122 Date Mileage Description Cost 12/8/2006 5,055 Changed oil $33.95 1/9/2007 12,509 Changed oil $25.88 2/8/2007 17,916 Changed oil $42.78 2/15/2007 19,841 Installed Lojack antitheft system $625.00 4/17/2007 30,124 Changed oil $42.36 6/19/2007 45,307 Changed oil $40.70 6/20/2007 45,695 Replaced two tires $257.46 7/10/2007 50,522 Changed oil $38.94 8/15/2007 55,654 Changed oil $32.85 9/3/2007 Vehicle involved in motor vehicle accident - deer hit car windshield and car was under repair 9/12/2007 60,395 Changed oil and replaced air filter $73.48 10/4/2007 65,226 Changed oil and replaced oil filter $37.16 10/19/2007 65,278 Transaxle service and replaced faulty AC compressor $1,056.62 (paid deductible) $100.00

19

Hydrogen ICE Vehicle Testing Activities  

SciTech Connect (OSTI)

The Advanced Vehicle Testing Activity teamed with Electric Transportation Applications and Arizona Public Service to develop and monitor the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant. The Pilot Plant provides 100% hydrogen, and hydrogen and compressed natural gas (H/CNG)-blended fuels for the evaluation of hydrogen and H/CNG internal combustion engine (ICE) vehicles in controlled and fleet testing environments. Since June 2002, twenty hydrogen and H/CNG vehicles have accumulated 300,000 test miles and 5,700 fueling events. The AVTA is part of the Department of Energys FreedomCAR and Vehicle Technologies Program. These testing activities are managed by the Idaho National Laboratory. This paper discusses the Pilot Plant design and monitoring, and hydrogen ICE vehicle testing methods and results.

J. Francfort; D. Karner

2006-04-01T23:59:59.000Z

20

Cost-effectiveness analysis of genetic testing for familial long QT syndrome in symptomatic index cases  

E-Print Network [OSTI]

Cost-Effectiveness Analysis of Genetic Testing for FamilialJ, Russell L, Weinstein M. Cost-effectiveness in health andSakowski J: An introduction to cost- effectiveness and cost-

Phillips, Kathryn A; Ackerman, M J; Sakowski, J; Berul, C I

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Two low-cost, modular sub-? test cryostats  

SciTech Connect (OSTI)

Two general-purpose liquid helium (LHe) test cryostats have been developed in support of a major upgrade to the Advanced Photon Source (APS) at Argonne National Laboratory (ANL). The cryostats are capable of sustained operation below 1.8 K and currently support tests of prototype superconducting rf (srf) cavities for the APS Upgrades Short Pulse X-ray (SPX) initiative. To save cost, two existing test vessels were reconditioned: one bucket dewar supporting bare cavity tests and one shielded vacuum vessel with an integral LHe reservoir for jacketed/dressed cavity tests. A new feedbox containing a heat exchanger and associated valves was also designed and fabricated to support either cryostat. The resulting modular design permits tests on a wide variety of srf cavities in various states of completion, minimizing cost and maximizing use of the hardware. Together with a dedicated vacuum pump, control system, and helium supply via storage dewar or cryoplant, these cryostats are vital to the srf cavity development effort within the APS Upgrade.

Fuerst, J. D.; Kaluzny, J. A. [Advanced Photon Source, Argonne National Laboratory, 9700 South Cass Avenue, Argonne, IL 60439 (United States)

2014-01-29T23:59:59.000Z

22

Cost-Sensitive Test Strategies Victor S. Sheng, Charles X. Ling  

E-Print Network [OSTI]

Cost-Sensitive Test Strategies Victor S. Sheng, Charles X. Ling Department of Computer Science cost of medical tests and misdiagnosis. In this paper, we design cost-sensitive machine learning learning whose values may be obtained at cost (attribute cost), and misdiagnoses are like

Ling, Charles X.

23

Advanced Vehicle Testing Activity (AVTA) ? PHEV Evaluations...  

Broader source: Energy.gov (indexed) [DOE]

Advanced Vehicle Testing Activity (AVTA) PHEV Evaluations and Data Collection Advanced Vehicle Testing Activity (AVTA) PHEV Evaluations and Data Collection Presentation from...

24

Measuring it Right: Best Practices in the Selection and Implementation of Cost-Effectiveness Tests  

Broader source: Energy.gov [DOE]

Presents the National Home Performance Council's cost-effectiveness tests, stakeholder concerns, public policy issues, and best practices.

25

HEV Fleet Testing Advanced Vehicle Testing Activity  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

VIN # 1N4CL21E87C172351 Date Mileage Description Cost 10/22/2007 3,658 Changed oil $36.39 11/14/2007 7,562 Changed oil $36.39 12/4/2007 12,008 Changed oil $36.41 1/3/2008 15,418 Changed oil $42.31 1/24/2008 19,057 Changed oil $27.60 1/29/2008 19,109 Replaced one tire $82.13 3/4/2008 24,662 Changed oil and filter $35.84 4/8/2008 32,703 Changed oil and filter $27.85 4/30/2008 37,495 Changed oil and filter $27.91 5/21/2008 40,655 Replaced and balanced four tires $258.41 5/29/2008 44,833 Changed oil and filter $27.91 7/2/2008 53,778 Changed oil and filter $27.91 8/4/2008 62,686 Changed oil and filter, replaced air filter and cabin air filter, replaced coolant, and rotated tires $246.04 8/22/2008 66,967 Changed oil and filled windshield washer $41.30

26

HEV Fleet Testing Advanced Vehicle Testing Activity  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 Ford Escape 2WD 5 Ford Escape 2WD VIN # 1FMYU95H75KC45881 Date Mileage Description Cost 5/25/2005 6,707 Changed oil (5W20 synthetic) and purchased oil for three oil changes $105.47 7/15/2005 17,236 15K service $438.65 8/17/2005 22,221 Changed oil and rotated tires $27.44 9/26/2005 27,425 Changed oil and rotated tires $28.20 11/8/2005 32,703 30K service $211.63 11/25/2005 33,560 Repaired tire $20.00 1/12/2006 42,632 45K service (included: tire balancing, replacing fuel filter and replacing cabin filter) $274.16 3/8/2006 52,141 Changed oil and rotated tires $31.56 4/19/2006 59,883 60K service $317.80 4/19/2006 59,883 HV traction battery connection failed $262.50 5/17/2006 64,641 Changed oil and rotated tires $34.73 6/5/2006 66,059 Recall for absorbing materials being insufficient above forward corner of the interior headliner no charge

27

HEV Fleet Testing Advanced Vehicle Testing Activity  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lexus RX400h Lexus RX400h VIN # JTJHW31U160002575 Date Mileage Description Cost 7/27/2005 5,159 Changed oil no charge 10/5/2005 10,375 10K service $212.23 1/4/2006 15,835 Changed oil and rotated tires $18.21 4/11/2006 21,752 Changed oil and rotated tires $18.69 8/16/2006 26,957 Changed oil and rotated tires $18.69 9/7/2006 27,641 Replaced power switch on rear door Warranty 11/20/2006 29,275 13 trouble codes with install of data box - replaced auxiliary battery Warranty 12/13/2006 32,283 Changed oil and rotated tires $23.18 1/4/2007 36,620 Changed oil $32.38 1/26/2007 41,491 changed oil and replaced filter $55.78 2/19/2007 45,948 Changed oil $40.47 3/29/2007 57,021 Changed oil $31.78 4/20/2007 61,238 Changed oil $35.92 5/11/2007 66,417 Changed oil $33.28

28

Boron-10 ABUNCL Active Testing  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards and Security (NA-241) is supporting the project Coincidence Counting With Boron-Based Alternative Neutron Detection Technology at Pacific Northwest National Laboratory (PNNL) for the development of a 3He proportional counter alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a system based upon 10B-lined proportional tubes in a configuration typical for 3He-based coincidence counter applications. This report provides results from testing of the active mode of the General Electric Reuter-Stokes Alternative Boron-Based Uranium Neutron Coincidence Collar (ABUNCL) at Los Alamos National Laboratory using sources and fuel pins.

Kouzes, Richard T.; Ely, James H.; Lintereur, Azaree T.; Siciliano, Edward R.

2013-07-09T23:59:59.000Z

29

Cost-effectiveness of a Genetic Test for Breast Cancer Risk  

Science Journals Connector (OSTI)

...2013 research-article Research Articles Cost-effectiveness of a Genetic Test for Breast...Surveillance Consortium data. The test was most cost-effective when given to patients at an...quality-adjusted life years per person at a cost of $163,264 per QALY. These results...

Henry J. Folse; Linda E. Green; Andrea Kress; Richard Allman; Tuan A. Dinh

2013-12-01T23:59:59.000Z

30

Is oxidative stress a physiological cost of reproduction? An experimental test in house mice  

Science Journals Connector (OSTI)

...cost of reproduction? An experimental test in house mice Michael Garratt 1 Aphrodite...with reproductive investment. Here, we test whether oxidative stress is a consequence...of reproductive investment. Here, we test whether oxidative stress is a consequence...

2011-01-01T23:59:59.000Z

31

E-Print Network 3.0 - activity based costing Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

based costing Page: << < 1 2 3 4 5 > >> 1 Generating and Maintaining Activity-based Cost Estimates with Feature-Based Product Models Summary: 1 Generating and Maintaining...

32

A TEST OF EARTHQUAKE EARLY WARNING SYSTEM USING LOW COST  

E-Print Network [OSTI]

-mail: drymwu@ntu.edu.tw 2 Department of Earth Sciences, National Cheng Kung University, 70101 Tainan, Taiwan Abstract The earthquake early warning (EEW) research group at the National Taiwan University (NTU) and one is available, a cost-effective seismic network dedicated to EEW or rapid re- porting is highly favored

Wu, Yih-Min

33

E-Print Network 3.0 - activity-based cost calculations Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by Explorit Topic List Advanced Search Sample search results for: activity-based cost calculations Page: << < 1 2 3 4 5 > >> 1 Generating and Maintaining Activity-based Cost...

34

Design and Development of a Low-Cost Test-Bed for Undergraduate Education in UAVs  

E-Print Network [OSTI]

Design and Development of a Low-Cost Test-Bed for Undergraduate Education in UAVs D. Jung, E. J for the development of a low-cost Unmanned Aerial Vehicle (UAV) test-bed for educational purposes. The objective) and graduate students (secondarily) in UAV research. The complete design and development of all hardware

Tsiotras, Panagiotis

35

Energy cost and efficiency of harvard step-test performance  

Science Journals Connector (OSTI)

Work oxygen and recovery oxygen consumption was calculated for two female and two male Caucasian subjects engaged in the Harvard step-test. A 50.80 cm bench was used by all subjects. During the six week period...

B. Ricci; K. Baldwin; R. Hakes; J. Fein

1966-01-01T23:59:59.000Z

36

Project Functions and Activities Definitions for Total Project Cost  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides guidelines developed to define the obvious disparity of opinions and practices with regard to what exactly is included in total estimated cost (TEC) and total project cost (TPC).

1997-03-28T23:59:59.000Z

37

Prioritizing JUnit Test Cases: An Empirical Assessment and Cost-Benefits Analysis  

E-Print Network [OSTI]

Prioritizing JUnit Test Cases: An Empirical Assessment and Cost-Benefits Analysis Hyunsook Do - Lincoln {dohy,grother,akinneer}@cse.unl.edu August 2, 2005 Abstract Test case prioritization provides a way to run test cases with the highest priority earliest. Numerous empirical studies have shown

Rothermel, Gregg

38

StatREC: a graphical user interface tool for visual hypothesis testing of cost prediction models  

Science Journals Connector (OSTI)

Background: During the previous decades there has been noted a significantly increased research interest on the construction of prediction models for accurate estimation of software cost. Despite the development of sophisticated methodologies, ... Keywords: REC curves, graphical comparison, graphical user interface, permutation test, prediction models, software cost estimation

Nikolaos Mittas; Ioannis Mamalikidis; Lefteris Angelis

2012-09-01T23:59:59.000Z

39

Design and testing of components for a low cost laser cutter  

E-Print Network [OSTI]

The main goal of this thesis is to document the design and testing of various components for use in a low cost laser cutting mechanism for hobbyists and recreational designers. Different electronics were used to assess the ...

Ramos, Joshua D

2011-01-01T23:59:59.000Z

40

Adaptive Test Cost and Quality Optimization Through An Effective Yet Efficient Delivery of Chip Specific Tests /  

E-Print Network [OSTI]

S. Ha, "On the Generation of Test Patterns for CombinationalDesign, Implementation and Analysis of Test Experiments,"in International Test Conference, 2006. P. Nigh, W. Needham,

Arslan, Baris

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Cost benefit and risk assessment for selected tank waste process testing alternatives  

SciTech Connect (OSTI)

The US Department of Energy has established the Tank Waste Remediation System (TWRS) program to safely manage wastes currently stored in underground tank at the Hanford Site. A TWRS testing and development strategy was recently developed to define long-range TWRS testing plans. The testing and development strategy considered four alternatives. The primary variable in the alternatives is the level of pilot-scale testing involving actual waste. This study evaluates the cost benefit and risks associated with the four alternatives. Four types of risk were evaluated: programmatic schedule risk, process mishap risk, worker risk, and public health risk. The structure of this report is as follows: Section 1 introduces the report subject; Section 2 describes the test strategy alternative evaluation; Section 3 describes the approach used in this study to assess risk and cost benefit; Section 4 describes the assessment methodologies for costs and risks; Section 5 describes the bases and assumptions used to estimate the costs and risks; Section 6 presents the detailed costs and risks; and Section 7 describes the results of the cost benefit analysis and presents conclusions.

Gasper, K.A. [Westinghouse Hanford Co., Richland, WA (United States)

1995-05-22T23:59:59.000Z

42

Activity: How Much Does it Cost to Light Your School? | Department...  

Broader source: Energy.gov (indexed) [DOE]

Activity: How Much Does It Cost to Light Your School? More Documents & Publications Comparing Light Bulbs Energy Efficiency Ambassadors (5-8) Energy Efficiency Ambassadors (9-12)...

43

FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS  

SciTech Connect (OSTI)

With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000--2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES has developed a portable system that will be tested at four different utility power plants. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as activated carbon, which removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG&E National Energy Group is providing two test sites that fire bituminous coals and both are equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB) coal and has an electrostatic precipitator for particulate control. Alabama Power Company will host a fourth test at its Plant Gaston, which is equipped with a hot-side electrostatic precipitator and a downstream fabric filter.

Michael D. Durham

2003-05-01T23:59:59.000Z

44

ANALYSIS OF SAFETY RELIEF VALVE PROOF TEST DATA TO OPTIMIZE LIFECYCLE MAINTENANCE COSTS  

SciTech Connect (OSTI)

Proof test results were analyzed and compared with a proposed life cycle curve or hazard function and the limit of useful life. Relief valve proof testing procedures, statistical modeling, data collection processes, and time-in-service trends are presented. The resulting analysis of test data allows for the estimation of the PFD. Extended maintenance intervals to the limit of useful life as well as methodologies and practices for improving relief valve performance and reliability are discussed. A generic cost-benefit analysis and an expected life cycle cost reduction concludes that $90 million maintenance dollars might be avoided for a population of 3000 valves over 20 years.

Gross, Robert; Harris, Stephen

2007-08-01T23:59:59.000Z

45

Advanced Vehicle Testing Activity (AVTA) ? Non-PHEV Evaluations...  

Broader source: Energy.gov (indexed) [DOE]

simulation and analysis technical team every other month * Testing results and life-cycle costs are used by vehicle modelers * Partnering with private sector testers provides...

46

Testing Oxygen Reduction Reaction Activity with the Rotating...  

Broader source: Energy.gov (indexed) [DOE]

Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique...

47

Technology, safety, and costs of decommissioning reference nuclear research and test reactors. Main report  

SciTech Connect (OSTI)

Safety and Cost Information is developed for the conceptual decommissioning of two representative licensed nuclear research and test reactors. Three decommissioning alternatives are studied to obtain comparisons between costs (in 1981 dollars), occupational radiation doses, potential radiation dose to the public, and other safety impacts. The alternatives considered are: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). The study results are presented in two volumes. Volume 1 (Main Report) contains the results in summary form.

Konzek, G.J.; Ludwick, J.D.; Kennedy, W.E. Jr.; Smith, R.I.

1982-03-01T23:59:59.000Z

48

FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS  

SciTech Connect (OSTI)

Brayton Point Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of the impacts of future mercury regulations to Brayton Point Unit 1, including performance, estimated cost, and operation data. This unit has variable (29-75%) native mercury removal, thus it was important to understand the impacts of process variables and activated carbon on mercury capture. The team responsible for executing this program included: (1) Plant and PG&E National Energy Group corporate personnel; (2) Electric Power Research Institute (EPRI); (3) United States Department of Energy National Energy Technology Laboratory (DOE/NETL); (4) ADA-ES, Inc.; (5) NORIT Americas, Inc.; (6) Apogee Scientific, Inc.; (7) TRC Environmental Corporation; (8) URS Corporation; (9) Quinapoxet Solutions; (10) Energy and Environmental Strategies (EES); and (11) Reaction Engineering International (REI). The technical support of all of these entities came together to make this program achieve its goals. Overall, the objectives of this field test program were to determine the impact of activated carbon injection on mercury control and balance-of-plant processes on Brayton Point Unit 1. Brayton Point Unit 1 is a 250-MW unit that fires a low-sulfur eastern bituminous coal. Particulate control is achieved by two electrostatic precipitators (ESPs) in series. The full-scale tests were conducted on one-half of the flue gas stream (nominally 125 MW). Mercury control sorbents were injected in between the two ESPs. The residence time from the injection grid to the second ESP was approximately 0.5 seconds. In preparation for the full-scale tests, 12 different sorbents were evaluated in a slipstream of flue gas via a packed-bed field test apparatus for mercury adsorption. Results from these tests were used to determine the five carbon-based sorbents that were tested at full-scale. Conditions of interest that were varied included SO{sub 3} conditioning on/off, injection concentrations, and distribution spray patterns. The original test plan called for parametric testing of NORIT FGD carbon at 1, 3, and 10 lbs/MMacf. These injection concentrations were estimated based on results from the Pleasant Prairie tests that showed no additional mercury removal when injection concentrations were increased above 10 lbs/MMacf. The Brayton Point parametric test data indicated that higher injection concentrations would achieve higher removal efficiencies and should be tested. The test plan was altered to include testing at 20 lbs/MMacf. The first test at this higher rate showed very high removal across the second ESP (>80%). Unlike the ''ceiling'' phenomenon witnessed at Pleasant Prairie, increasing sorbent injection concentration resulted in further capture of vapor-phase mercury. The final phase of field-testing was a 10-day period of continuous injection of NORIT FGD carbon. During the first five days, the injection concentration was held at 10 lbs/MMacf, followed by nominally five days of testing at an injection concentration of 20 lbs/MMacf. The mercury removal, as measured by the semi-continuous emission monitors (S-CEM), varied between 78% and 95% during the 10 lbs/MMacf period and increased to >97% when the injection concentration was increased to 20 lbs/MMacf. During the long-term testing period, mercury measurements following EPA's draft Ontario Hydro method were conducted by TRC Environmental Corporation at both 10 and 20 lbs/MMacf test conditions. The Ontario Hydro data showed that the particulate mercury removal was similar between the two conditions of 10 or 20 lbs/MMacf and removal efficiencies were greater than 99%. Elemental mercury was not detected in any samples, so no conclusions as to its removal can be drawn. Removal of oxidized mercury, on the other hand, increased from 68% to 93% with the higher injection concentration. These removal rates agreed well with the S-CEM results.

Michael D. Durham

2005-03-17T23:59:59.000Z

49

Adaptive Test Cost and Quality Optimization Through An Effective Yet Efficient Delivery of Chip Specific Tests.  

E-Print Network [OSTI]

??The higher levels of integration and process scaling imposes failure behaviors which are challenging to interpret, necessitating the continuous augmentation of fault models and test (more)

Arslan, Baris

2013-01-01T23:59:59.000Z

50

FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS  

SciTech Connect (OSTI)

PG&E NEG Salem Harbor Station Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of mercury control at Salem Harbor Unit 1, including performance, estimated cost, and operation data. This unit has very high native mercury removal, thus it was important to understand the impacts of process variables on native mercury capture. The team responsible for executing this program included plant and PG&E headquarters personnel, EPRI and several of its member companies, DOE, ADA, Norit Americas, Inc., Hamon Research-Cottrell, Apogee Scientific, TRC Environmental Corporation, Reaction Engineering, as well as other laboratories. The technical support of all of these entities came together to make this program achieve its goals. Overall the objectives of this field test program were to determine the mercury control and balance-of-plant impacts resulting from activated carbon injection into a full-scale ESP on Salem Harbor Unit 1, a low sulfur bituminous-coal-fired 86 MW unit. It was also important to understand the impacts of process variables on native mercury removal (>85%). One half of the gas stream was used for these tests, or 43 MWe. Activated carbon, DARCO FGD supplied by NORIT Americas, was injected upstream of the cold side ESP, just downstream of the air preheater. This allowed for approximately 1.5 seconds residence time in the duct before entering the ESP. Conditions tested in this field evaluation included the impacts of the Selective Non-Catalytic Reduction (SNCR) system on mercury capture, of unburned carbon in the fly ash, of adjusting ESP inlet flue gas temperatures, and of boiler load on mercury control. The field evaluation conducted at Salem Harbor looked at several sorbent injection concentrations at several flue gas temperatures. It was noted that at the mid temperature range of 322-327 F, the LOI (unburned carbon) lost some of its ability to capture vapor phase Hg, however activated carbon performed relatively well. At the normal operating temperatures of 298-306 F, mercury emissions from the ESP were so low that both particulate and elemental mercury were ''not detected'' at the detection limits of the Ontario Hydro method for both baseline and injection tests. The oxidized mercury however, was 95% lower at a sorbent injection concentration of 10 lbs/MMacf compared with baseline emissions. When the flue gas temperatures were increased to a range of 343-347 F, mercury removal efficiencies were limited to <25%, even at the same sorbent injection concentration. Other tests examined the impacts of fly ash LOI, operation of the SNCR system, and flue gas temperature on the native mercury capture without sorbent injection. Listed below are the main conclusions from this program: (1) SNCR on/off test showed no beneficial effect on mercury removal caused by the SNCR system. (2) At standard operating temperatures ({approx} 300 F), reducing LOI from 30-35% to 15-20% had minimal impact on Hg removal. (3) Increasing flue gas temperatures reduced Hg removal regardless of LOI concentrations at Salem Harbor (minimum LOI was 15%). Native mercury removal started to fall off at temperatures above 320 F. ACI effectiveness for mercury removal fell off at temperatures above 340 F. (4) Test method detection limits play an important role at Salem Harbor due to the low residual emissions. Examining the proposed MA rule, both the removal efficiency and the emission concentrations will be difficult to demonstrate on an ongoing basis. (5) Under tested conditions the baseline emissions met the proposed removal efficiency for 2006, but not the proposed emission concentration. ACI can meet the more-stringent 2012 emission limits, as long as measurement detection limits are lower than the Ontario Hydro method. SCEM testing was able to verify the low emissions. For ACI to perform at this level, process conditions need to match those obtained during testing.

Michael D. Durham

2004-10-01T23:59:59.000Z

51

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Broader source: Energy.gov (indexed) [DOE]

DU5A0006063 Date Mileage Description Cost 8192009 5,090 Changed oil and filter and rotated tires 39.28 9162009 14,484 Changed oil and filter and replaced flat tire 152.58 10...

52

Making a Low-Cost Soda Can Ethanol Burner for Out-of-Laboratory Flame Test Demonstrations and Experiments  

Science Journals Connector (OSTI)

Making a Low-Cost Soda Can Ethanol Burner for Out-of-Laboratory Flame Test Demonstrations and Experiments ... Video clips for the three flame tests shown in Figure 3, and for turning the burner on and off. ...

Henson L. Lee Yu; Perfecto N. Domingo, Jr.; Elliard Roswell S. Yanza; Armando M. Guidote, Jr.

2014-10-13T23:59:59.000Z

53

Summary of Construction Equipment Tests and Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment Tests A series of tests were conducted by the APS Construction Vibration Measurement Task Force using various pieces of construction equipment at the APCF...

54

Technology, safety, and costs of decommissioning reference nuclear research and test reactors: sensitivity of decommissioning radiation exposure and costs to selected parameters  

SciTech Connect (OSTI)

Additional analyses of decommissioning at the reference research and test (R and T) reactors and analyses of five recent reactor decommissionings are made that examine some parameters not covered in the initial study report (NUREG/CR-1756). The parameters examined for decommissioning are: (1) the effect on costs and radiation exposure of plant size and/or type; (2) the effects on costs of increasing disposal charges and of unavailability of waste disposal capacity at licensed waste disposal facilities; and (3) the costs of and the available alternatives for the disposal of nuclear R and T reactor fuel assemblies.

Konzek, G.J.

1983-07-01T23:59:59.000Z

55

Advanced Vehicle Testing Activity: Light-Duty Vehicles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Light-Duty Light-Duty Vehicles to someone by E-mail Share Advanced Vehicle Testing Activity: Light-Duty Vehicles on Facebook Tweet about Advanced Vehicle Testing Activity: Light-Duty Vehicles on Twitter Bookmark Advanced Vehicle Testing Activity: Light-Duty Vehicles on Google Bookmark Advanced Vehicle Testing Activity: Light-Duty Vehicles on Delicious Rank Advanced Vehicle Testing Activity: Light-Duty Vehicles on Digg Find More places to share Advanced Vehicle Testing Activity: Light-Duty Vehicles on AddThis.com... Home Overview Light-Duty Vehicles Alternative Fuel Vehicles Plug-in Hybrid Electric Vehicles Hybrid Electric Vehicles Micro Hybrid Vehicles ARRA Vehicle and Infrastructure Projects EVSE Testing Energy Storage Testing Hydrogen Internal Combustion Engine Vehicles Other ICE

56

Lifecycle Prognostics Architecture for Selected High-Cost Active Components  

SciTech Connect (OSTI)

There are an extensive body of knowledge and some commercial products available for calculating prognostics, remaining useful life, and damage index parameters. The application of these technologies within the nuclear power community is still in its infancy. Online monitoring and condition-based maintenance is seeing increasing acceptance and deployment, and these activities provide the technological bases for expanding to add predictive/prognostics capabilities. In looking to deploy prognostics there are three key aspects of systems that are presented and discussed: (1) component/system/structure selection, (2) prognostic algorithms, and (3) prognostics architectures. Criteria are presented for component selection: feasibility, failure probability, consequences of failure, and benefits of the prognostics and health management (PHM) system. The basis and methods commonly used for prognostics algorithms are reviewed and summarized. Criteria for evaluating PHM architectures are presented: open, modular architecture; platform independence; graphical user interface for system development and/or results viewing; web enabled tools; scalability; and standards compatibility. Thirteen software products were identified and discussed in the context of being potentially useful for deployment in a PHM program applied to systems in a nuclear power plant (NPP). These products were evaluated by using information available from company websites, product brochures, fact sheets, scholarly publications, and direct communication with vendors. The thirteen products were classified into four groups of software: (1) research tools, (2) PHM system development tools, (3) deployable architectures, and (4) peripheral tools. Eight software tools fell into the deployable architectures category. Of those eight, only two employ all six modules of a full PHM system. Five systems did not offer prognostic estimates, and one system employed the full health monitoring suite but lacked operations and maintenance support. Each product is briefly described in Appendix A. Selection of the most appropriate software package for a particular application will depend on the chosen component, system, or structure. Ongoing research will determine the most appropriate choices for a successful demonstration of PHM systems in aging NPPs.

N. Lybeck; B. Pham; M. Tawfik; J. B. Coble; R. M. Meyer; P. Ramuhalli; L. J. Bond

2011-08-01T23:59:59.000Z

57

Advanced Vehicle Testing Activity (AVTA) ? PHEV Evaluations...  

Broader source: Energy.gov (indexed) [DOE]

Speed Voltage 40 FY07 FY08 NYSERDA * The AVTA is testing all six of the New York State Energy Research and Development Agency's PHEV conversions. Models and test status: Model...

58

Survey of state regulatory activities on least cost planning for gas utilities  

SciTech Connect (OSTI)

Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. Incorporating the concept of meeting customer energy service needs entails a recognition that customers' costs must be considered along with the utility's costs in the economic analysis of energy options. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. All state commissions were surveyed to assess the current status of gas planning and demand-side management and to identify significant regulatory issues faced by commissions during the next several years. The survey was to determine the extent to which they have undertaken least-cost planning for gas utilities. The survey included the following topics: (1) status of state PUC least-cost planning regulations and practices for gas utilities; (2) type and scope ofnatural gas DSM programs in effect, includeing fuel substitution; (3) economic tests and analysis methods used to evaluate DSM programs; (4) relationship between prudence reviews of gas utility purchasing practices and integrated resource planning; and (5) key regulatory issues facing gas utilities during the next five years. 34 refs., 6 figs., 10 tabs.

Goldman, C.A. (Lawrence Berkeley Lab., CA (United States) National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Hopkins, M.E. (Fleming Group, Washington, DC (United States))

1991-04-01T23:59:59.000Z

59

Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule  

SciTech Connect (OSTI)

This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

Soli T. Khericha

2006-09-01T23:59:59.000Z

60

Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Medium- and Medium- and Heavy-Duty Vehicles to someone by E-mail Share Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Facebook Tweet about Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Twitter Bookmark Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Google Bookmark Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Delicious Rank Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Digg Find More places to share Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on AddThis.com... Home Overview Light-Duty Vehicles Medium- and Heavy-Duty Vehicles Transit Vehicles Trucks Idle Reduction Oil Bypass Filter Airport Ground Support Equipment Medium and Heavy Duty Hybrid Electric Vehicles

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Recovery Efficiency Test Project: Phase 1, Activity report  

SciTech Connect (OSTI)

This report is the second volume of the Recovery Efficiency Test Phase I Report of Activities. Volume 1 covered selection, well planning, drilling, coring, logging and completion operations. This volume reports on well testing activities, reclamation activities on the drilling site and access roads, and the results of physical and mechanical properties tests on the oriented core material obtained from a horizontal section of the well. 3 refs., 21 figs., 10 tabs.

Overbey, W.K. Jr.; Wilkins, D.W.; Keltch, B.; Saradji, B.; Salamy, S.P.

1988-04-01T23:59:59.000Z

62

Cost of Genetic Counseling and Testing for BRCA1 and BRCA2 Breast Cancer Susceptibility Mutations  

Science Journals Connector (OSTI)

...news News in Depth Seeking Value as Cancer Drug Costs Soar As significant increases in the costs of cancer drugs cause financial difficulties...Oncologists and their patients look closer at the cost-effectiveness of expensive therapies As the...

William F. Lawrence; Beth N. Peshkin; Wenchi Liang; Claudine Isaacs; Caryn Lerman; Jeanne S. Mandelblatt

2001-05-01T23:59:59.000Z

63

IFMIF, International Fusion Materials Irradiation Facility conceptual design activity cost report  

SciTech Connect (OSTI)

This report documents the cost estimate for the International Fusion Materials Irradiation Facility (IFMIF) at the completion of the Conceptual Design Activity (CDA). The estimate corresponds to the design documented in the Final IFMIF CDA Report. In order to effectively involve all the collaborating parties in the development of the estimate, a preparatory meeting was held at Oak Ridge National Laboratory in March 1996 to jointly establish guidelines to insure that the estimate was uniformly prepared while still permitting each country to use customary costing techniques. These guidelines are described in Section 4. A preliminary cost estimate was issued in July 1996 based on the results of the Second Design Integration Meeting, May 20--27, 1996 at JAERI, Tokai, Japan. This document served as the basis for the final costing and review efforts culminating in a final review during the Third IFMIF Design Integration Meeting, October 14--25, 1996, ENEA, Frascati, Italy. The present estimate is a baseline cost estimate which does not apply to a specific site. A revised cost estimate will be prepared following the assignment of both the site and all the facility responsibilities.

Rennich, M.J. [comp.

1996-12-01T23:59:59.000Z

64

NHA-DOE Cost Shared Activities: Hydrogen Codes and Standards Outreach  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NHA-DOE Cost Shared Activities: NHA-DOE Cost Shared Activities: Hydrogen Codes and Standards Outreach Karen Miller, Vice President The National Hydrogen Association 1800 M Street NW, Suite 300 Washington, DC 20036-5802 phone: 202-223-5547 fax: 202-223-5537 Background: The Mission of the National Hydrogen Association (NHA) is to foster the development of hydrogen technologies and their use in commercial and industrial applications and to promote the role of hydrogen as a major energy carrier of the future. The basic long-term goals are determined by the greatest needs tempered by activities consistent with the role of the NHA as an association. Today these are: * To educate the public and policy makers on the benefits of hydrogen; * To assist in the development of necessary hydrogen codes and standards; and

65

Fault (In)Dependent Cost Estimates and Conflict-Directed Backtracking to Guide Sequential Circuit Test Generation  

Science Journals Connector (OSTI)

The search for tests for sequential circuits (STPG) by deterministic test pattern generation is a process of alternately performing mandatory assignments and heuristic decisions on signal lines. We have observed problems in the decision-making process ... Keywords: ATPG, sequential circuit TPG, cost estimates, back-jumping, conflict-directed backtrack, three-state (tri-state) circuit TPG

Mario Konijnenburg; Hans Van der Linden; Ad van de Goor

1999-11-01T23:59:59.000Z

66

Do Americans Consume Too Little Natural Gas? An Empirical Test of Marginal Cost Pricing  

E-Print Network [OSTI]

production, and in particular, coal, are associated with considerably larger external costs than natural gas.costs of energy. In the United States, 81% of greenhouse gas emissions are derived directly from the production

Davis, Lucas; Muehlegger, Erich

2009-01-01T23:59:59.000Z

67

LOW ACTIVITY WASTE FEED SOLIDS CARACTERIZATION AND FILTERABILITY TESTS  

SciTech Connect (OSTI)

The primary treatment of the tank waste at the DOE Hanford site will be done in the Waste Treatment and Immobilization Plant (WTP) that is currently under construction. The baseline plan for the WTP Pretreatment facility is to treat the waste, splitting it into High Level Waste (HLW) feed and Low Activity Waste (LAW) feed. Both waste streams are then separately vitrified as glass and sealed in canisters. The LAW glass will be disposed onsite in the Integrated Disposal Facility (IDF). There are currently no plans to treat the waste to remove technetium in the WTP Pretreatment facility, so its disposition path is the LAW glass. Options are being explored to immobilize the LAW portion of the tank waste, i.e., the LAW feed from the WTP Pretreatment facility. Removal of {sup 99}Tc from the LAW Feed, followed by off-site disposal of the {sup 99}Tc, would eliminate a key risk contributor for the IDF Performance Assessment (PA) for supplemental waste forms, and has potential to reduce treatment and disposal costs. Washington River Protection Solutions (WRPS) is developing some conceptual flow sheets for LAW treatment and disposal that could benefit from technetium removal. One of these flowsheets will specifically examine removing {sup 99}Tc from the LAW feed stream to supplemental immobilization. The conceptual flow sheet of the {sup 99}Tc removal process includes a filter to remove insoluble solids prior to processing the stream in an ion exchange column, but the characteristics and behavior of the liquid and solid phases has not previously been investigated. This report contains results of testing of a simulant that represents the projected composition of the feed to the Supplemental LAW process. This feed composition is not identical to the aqueous tank waste fed to the Waste Treatment Plant because it has been processed through WTP Pretreatment facility and therefore contains internal changes and recycle streams that will be generated within the WTP process. Although a Supplemental LAW feed simulant has previously been prepared, this feed composition differs from that simulant because those tests examined only the fully soluble aqueous solution at room temperature, not the composition formed after evaporation, including the insoluble solids that precipitate after it cools. The conceptual flow sheet for Supplemental LAW immobilization has an option for removal of {sup 99}Tc from the feed stream, if needed. Elutable ion exchange has been selected for that process. If implemented, the stream would need filtration to remove the insoluble solids prior to processing in an ion exchange column. The characteristics, chemical speciation, physical properties, and filterability of the solids are important to judge the feasibility of the concept, and to estimate the size and cost of a facility. The insoluble solids formed during these tests were primarily natrophosphate, natroxalate, and a sodium aluminosilicate compound. At the elevated temperature and 8 M [Na+], appreciable insoluble solids (1.39 wt%) were present. Cooling to room temperature and dilution of the slurry from 8 M to 5 M [Na+] resulted in a slurry containing 0.8 wt% insoluble solids. The solids (natrophosphate, natroxalate, sodium aluminum silicate, and a hydrated sodium phosphate) were relatively stable and settled quickly. Filtration rates were in the range of those observed with iron-based simulated Hanford tank sludge simulants, e.g., 6 M [Na+] Hanford tank 241-AN-102, even though their chemical speciation is considerably different. Chemical cleaning of the crossflow filter was readily accomplished with acid. As this simulant formulation was based on an average composition of a wide range of feeds using an integrated computer model, this exact composition may never be observed. But the test conditions were selected to enable comparison to the model to enable improving its chemical prediction capability.

McCabe, D.; Crawford, C.; Duignan, M.; Williams, M.; Burket, P.

2014-04-03T23:59:59.000Z

68

Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.  

SciTech Connect (OSTI)

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.

2013-05-01T23:59:59.000Z

69

Advanced Vehicle Testing Activity (AVTA) ? Non-PHEV Evaluations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Non-PHEV Evaluations and Data Collection Advanced Vehicle Testing Activity (AVTA) Non-PHEV Evaluations and Data Collection Presentation from the U.S. DOE Office of Vehicle...

70

Energy-efficiency testing activities of the Mobile Energy Laboratory  

SciTech Connect (OSTI)

This report summarizes energy-efficiency testing activities during the first and second quarters of fiscal year 1990 applying the Mobile Energy Laboratory (MEL) testing capabilities. Four MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) for energy testing and program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities.

Parker, G.B.

1991-01-01T23:59:59.000Z

71

Hydrogen Internal Combustion Engine (ICE) Vehicle Testing Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Internal Combustion Internal Combustion Engine (ICE) Vehicle Testing Activities James Francfort Idaho National Laboratory 2 Paper #2006-01-0433 Presentation Outline Background and goal APS Alternative Fuel (Hydrogen) Pilot Plant - design and operations Fuel dispensing and prototype dispenser Hydrogen (H2) and HCNG (compressed natural gas) internal combustion engine (ICE) vehicle testing WWW Information 3 Paper #2006-01-0433 Background Advanced Vehicle Testing Activity (AVTA) is part of DOE's FreedomCAR and Vehicle Technologies Program These activities are conducted by the Idaho National Laboratory (INL) and the AVTA testing partner Electric Transportation Applications (ETA) 4 Paper #2006-01-0433 AVTA Goal Provide benchmark data for technology modeling, research and development programs, and help fleet managers and

72

Cost analysis of Hybrid LFSR as deterministic and pseudorandom test pattern generator.  

E-Print Network [OSTI]

??Hybrid Linear Feedback Shift Register (HLFSR) is a new Built-in Self Test (BIST) pattern generator that can generate a set of deterministic test patterns followed (more)

Utama, Peter

2012-01-01T23:59:59.000Z

73

An adaptable, low cost test-bed for unmanned vehicle systems research.  

E-Print Network [OSTI]

?? An unmanned vehicle systems test-bed has been developed. The test-bed has been designed to accommodate hardware changes and various vehicle types and algorithms. The (more)

Goppert, James M.

2011-01-01T23:59:59.000Z

74

Construction and Test of Low Cost X-Ray Tomography Scanner for Physical-Chemical Analysis and Nondestructive Inspections  

SciTech Connect (OSTI)

X-ray computed tomography (CT) refers to the cross-sectional imaging of an object measuring the transmitted radiation at different directions. In this work, we describe the development of a low cost micro-CT X-ray scanner that is being developed for nondestructive testing. This tomograph operates using a microfocus X-ray source and contains a silicon photodiode as detectors. The performance of the system, by its spatial resolution, has been estimated through its Modulation Transfer Function-MTF and the obtained value at 10% of MTF is 661 {mu}m. It was built as a general purpose nondestructive testing device.

Oliveira, Jose Martins Jr. de [Universidade de Sorocaba-UNISO, Campus Seminario, Caixa Postal 578, Av. Dr. Eugenio Salermo, 100, Centro, 18035-430, Sorocaba, SP (Brazil); Martins, Antonio Cesar Germano [Universidade Estadual Paulista Julio de Mesquita Filho-UNESP, GASI, Av. 3 de Marco, 511, Alto da Boa Vista, 18087-180, Sorocaba, SP (Brazil)

2009-06-03T23:59:59.000Z

75

E-Print Network 3.0 - activation test locations Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test locations Search Powered by Explorit Topic List Advanced Search Sample search results for: activation test locations Page: << < 1 2 3 4 5 > >> 1 Acoustic Emission Tests...

76

Engineering Evaluation/Cost Analysis for Decommissioning of the Engineering Test Reactor Complex  

SciTech Connect (OSTI)

Preparation of this Engineering Evaluation/Cost Analysis is consistent with the joint U.S. Department of Energy and U.S. Environmental Protection Agency Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation, and Liability Act, which establishes the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action (NTCRA) process as an approach for decommissioning.

A. B. Culp

2006-10-01T23:59:59.000Z

77

THE TRUE COST OF PAIR PROGRAMMING: DEVELOPMENT OF A COMPREHENSIVE MODEL AND TEST  

E-Print Network [OSTI]

teams at Symantec produced cleaner test classes and better coverage tests through the pair- programming process (Morales, 2002). Jensen, a consultant for the Software Technology Support Center, Hill Air Force Base, reported an error rate of 0.001 in a...

Sun, Wenying

2011-09-19T23:59:59.000Z

78

Analytical methods for establishing least cost search patterns for fault isolation in testing procedures  

E-Print Network [OSTI]

YL and sho!n in 1 i gurc 2. A!sly?is of th ~ configuration shows that each n )ramcter ti!at . . uppoz t: Y can be tested inde . pndently or '. t can t&e . est d in coml& nation, ", as follows: (1) Individually by measuring x), x2, x3, nd x, , v... of the twc will be selected, however, a limit can be established on the maximum number of useful test n-1 patterns at 2 -1, and for the example case, 7. 15 DFCIHIOI'1 CR1TFRIA Intuitively, it woui d be expected to test an itesi . or failure that has a...

Howie, Thomas Fisher

2012-06-07T23:59:59.000Z

79

Preliminary Cost Assessment and Compare of China Fusion Engineering Test Reactor  

Science Journals Connector (OSTI)

Full superconducting tokamak and water-cooling Cu magnets tokamak are two options proposed for China Fusion Engineering Test Reactor (CFETR). Based on the concept design ... Program for Parameters Optimization an...

Dehong Chen; Jieqiong Jiang; Yawei Hou; Wenxue Duan; Muyi Ni

2014-09-01T23:59:59.000Z

80

Low Cost Power and Supply Noise Estimation and Control in Scan Testing of VLSI Circuits  

E-Print Network [OSTI]

. To achieve constant test power, first, we built a fast and accurate power model, which can estimate the shift power without logic simulation of the circuit. We also proposed an efficient and low power X-bit Filling process, which could potentially reduce both...

Jiang, Zhongwei

2012-02-14T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Activity-based costing simulation as a tool for construction process optimization  

E-Print Network [OSTI]

Variable and fixed costs. . 111. 2. 3 Crash duration and cost. 111. 2. 4 Least cost scheduling 111. 2. 5 Optimization objectives. . . . . 15 17 17 18 19 20 23 CHAPTER IV APPLICATIONS OF OPTIMIZATION TOOLS IN CONSTRUCTION . . Page 25 IV. I... Excavation Project. . . . . . . . . . . . . . . . . . . . VIII. 2. 1 Option 1: with 15CY hauler . VIII. 2. 1. 1 STEP 1: Calculate resource balance point. . . . VIII. 2. 1. 2 STEP 2: Simulate the minimum ratios. . . . . . . . VIII. 2. 1. 3 STEP 3: Simulate...

Son, Junghye

1999-01-01T23:59:59.000Z

82

E-Print Network 3.0 - activity-based costing evaluation Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

; Engineering 10 www.ext.vt.edu Produced by Communications and Marketing, College of Agriculture and Life Sciences, Summary: of two cost accounting techniques -- the direct...

83

E-Print Network 3.0 - activity-based cost analysis Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sciences 7 www.ext.vt.edu Produced by Communications and Marketing, College of Agriculture and Life Sciences, Summary: of two cost accounting techniques -- the direct...

84

Boron-10 ABUNCL Prototype Models And Initial Active Testing  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards and Security (NA-241) is supporting the project Coincidence Counting With Boron-Based Alternative Neutron Detection Technology at Pacific Northwest National Laboratory (PNNL) for the development of a 3He proportional counter alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a system based upon 10B-lined proportional tubes in a configuration typical for 3He-based coincidence counter applications. This report provides results from MCNPX model simulations and initial testing of the active mode variation of the Alternative Boron-Based Uranium Neutron Coincidence Collar (ABUNCL) design built by General Electric Reuter-Stokes. Initial experimental testing of the as-delivered passive ABUNCL was previously reported.

Kouzes, Richard T.; Ely, James H.; Lintereur, Azaree T.; Siciliano, Edward R.

2013-04-23T23:59:59.000Z

85

Breakthrough in platinum structures maintains high catalytic activity and could lead to reduced costs for  

E-Print Network [OSTI]

costs for hydrogen fuel cells, which hold the promise of powering vehicles and buildings. Hydrogen fuel be useful in hydrogen fuel cells while sharply driving down the cost compared to an all-platinum catalyst cells could power the vehicles of tomorrow. With platinum an essential catalyst in fuel cells

86

Assessment of energetic costs of AhR activation by ?-naphthoflavone in rainbow trout (Oncorhynchus mykiss) hepatocytes using metabolic flux analysis  

SciTech Connect (OSTI)

Exposure to environmental contaminants such as activators of the aryl hydrocarbon receptor (AhR) leads to the induction of defense and detoxification mechanisms. While these mechanisms allow organisms to metabolize and excrete at least some of these environmental contaminants, it has been proposed that these mechanisms lead to significant energetic challenges. This study tests the hypothesis that activation of the AhR by the model agonist ?-naphthoflavone (?NF) results in increased energetic costs in rainbow trout (Oncorhynchus mykiss) hepatocytes. To address this hypothesis, we employed traditional biochemical approaches to examine energy allocation and metabolism including the adenylate energy charge (AEC), protein synthesis rates, Na{sup +}/K{sup +}-ATPase activity, and enzyme activities. Moreover, we have used for the first time in a fish cell preparation, metabolic flux analysis (MFA) an in silico approach for the estimation of intracellular metabolic fluxes. Exposure of trout hepatocytes to 1 ?M ?NF for 48 h did not alter hepatocyte AEC, protein synthesis, or Na{sup +}/K{sup +}-ATPase activity but did lead to sparing of glycogen reserves and changes in activities of alanine aminotransferase and citrate synthase suggesting altered metabolism. Conversely, MFA did not identify altered metabolic fluxes, although we do show that the dynamic metabolism of isolated trout hepatocytes poses a significant challenge for this type of approach which should be considered in future studies. - Highlights: Energetic costs of AhR activation by ?NF was examined in rainbow trout hepatocytes. Metabolic flux analysis was performed on a fish cell preparation for the first time. Exposure to ?NF led to sparing of glycogen reserves and altered enzyme activities. Adenylate energy charge was maintained despite temporal changes in metabolism.

Nault, Rance, E-mail: naultran@msu.edu [Ottawa-Carleton Institute of Biology, Department of Biology and Centre for Advanced Research in Environmental Genomics, University of Ottawa, Ottawa, Ontario, K1N 6N5 (Canada); Abdul-Fattah, Hiba [Ottawa-Carleton Institute of Biology, Department of Biology and Centre for Advanced Research in Environmental Genomics, University of Ottawa, Ottawa, Ontario, K1N 6N5 (Canada); Mironov, Gleb G.; Berezovski, Maxim V. [Ottawa-Carleton Institute of Biology, Department of Biology and Centre for Advanced Research in Environmental Genomics, University of Ottawa, Ottawa, Ontario, K1N 6N5 (Canada); Department of Chemistry, University of Ottawa, Ottawa, Ontario, K1N 6N5 (Canada); Moon, Thomas W. [Ottawa-Carleton Institute of Biology, Department of Biology and Centre for Advanced Research in Environmental Genomics, University of Ottawa, Ottawa, Ontario, K1N 6N5 (Canada)

2013-08-15T23:59:59.000Z

87

E-Print Network 3.0 - activities field test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

field test Search Powered by Explorit Topic List Advanced Search Sample search results for: activities field test Page: << < 1 2 3 4 5 > >> 1 Space Radiation Shielding Program...

88

HEV Fleet Testing - Summary Fact Sheet for the 2010 Honda Insight  

Broader source: Energy.gov (indexed) [DOE]

**Operating costs includes insurance, fuel, and registration costs Advanced Vehicle Testing Activity 2010 Honda Insight VIN JHMZE2H78AS010141 Description: This vehicle is...

89

HEV Fleet Testing - Summary Fact Sheet 2010 Ford Fusion vin#4757  

Broader source: Energy.gov (indexed) [DOE]

**Operating costs includes insurance, fuel, and registration costs Advanced Vehicle Testing Activity 2010 Ford Fusion VIN 3FADP0L34AR144757 Description: This vehicle is...

90

Testing an Active Diesel Particulate Filter on a 2-Cycle Marine...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Testing an Active Diesel Particulate Filter on a 2-Cycle Marine Engine Testing an Active Diesel Particulate Filter on a 2-Cycle Marine Engine Presentation given at DEER 2006,...

91

Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique  

Broader source: Energy.gov [DOE]

Presentation slides from the Fuel Cell Technologies Office webinar, Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique, held March 12, 2013.

92

Webinar: Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique  

Broader source: Energy.gov [DOE]

Video recording of the Fuel Cell Technologies Office webinar, Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique, originally presented on March 12, 2013.

93

Hybrid Electric Vehicle Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transportation Association Conference Transportation Association Conference Vancouver, Canada December 2005 Hybrid Electric Vehicle Testing Jim Francfort U.S. Department of Energy - FreedomCAR & Vehicle Technologies Program, Advanced Vehicle Testing Activity INL/CON-05-00964 Presentation Outline * Background & goals * Testing partners * Hybrid electric vehicle testing - Baseline performance testing (new HEV models) - 1.5 million miles of HEV fleet testing (160k miles per vehicle in 36 months) - End-of-life HEV testing (rerun fuel economy & conduct battery testing @ 160k miles per vehicle) - Benchmark data: vehicle & battery performance, fuel economy, maintenance & repairs, & life-cycle costs * WWW information location Background * Advanced Vehicle Testing Activity (AVTA) - part of the

94

A decomposition approach to project compression in CPM/PERT networks with concave activity cost functions  

E-Print Network [OSTI]

. . IV. 2 DECRIPTION OF MAIN SUBROUTINES . IV. 3 ILLUSTRATIVE EXAMPLE . . IV. 4 LIMITATIONS OF THE COMPUTERIZED PROCEDURE . . 16 18 21 22 CHAPTER V APPLICATIONS OF THE PROPOSED METHOD . . 25 CHAPTER VI SUMMARY, CONCLUSIONS AND RECOMMENDATIONS 29... on the k "linear segment for activity (i, j) Subject to tc Maximize g P u, js ybs, (iu) E A k=1 (6) K t, + Q pijs ? tg & ? L0oi k=1 ? tt+t?= T V(i j) E A v&3$ & Lssk Luis rp V (i j ) 6 A, and k = 1, 2, . . . , K (9) 6;, s(L?t ? L;, (s &)) & ybs...

Kuyumcu, Ahmet

2012-06-07T23:59:59.000Z

95

Solar Energy Education. Industrial arts: student activities. Field test edition  

SciTech Connect (OSTI)

In this teaching manual several activities are presented to introduce students to information on solar energy through classroom instruction. Wind power is also included. Instructions for constructing demonstration models for passive solar systems, photovoltaic cells, solar collectors and water heaters, and a bicycle wheel wind turbine are provided. (BCS)

Not Available

1981-02-01T23:59:59.000Z

96

Recovery Efficiency Test Project: Phase 1, Activity report  

SciTech Connect (OSTI)

The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

1987-04-01T23:59:59.000Z

97

Startup Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

1997-03-28T23:59:59.000Z

98

Development and evaluation of carbon and binder loading in low-cost activated carbon cathodes for air-cathode microbial fuel cells{  

E-Print Network [OSTI]

Development and evaluation of carbon and binder loading in low-cost activated carbon cathodes materials in order to optimize and extend the lifetime of AC cathodes in MFCs. 1. Introduction A microbial, with the cathode typically limiting power production.5,6 Catalysts can be used to reduce the activation energy

99

Summary Report on FY12 Small-Scale Test Activities High Temperature Electrolysis Program  

SciTech Connect (OSTI)

This report provides a description of the apparatus and the single cell testing results performed at Idaho National Laboratory during JanuaryAugust 2012. It is an addendum to the Small-Scale Test Report issued in January 2012. The primary program objectives during this time period were associated with design, assembly, and operation of two large experiments: a pressurized test, and a 4 kW test. Consequently, the activities described in this report represent a much smaller effort.

James O'Brien

2012-09-01T23:59:59.000Z

100

Cost analysis of revisions to 10 CFR Part 50, Appendix J, leak tests for primary and secondary containments of light-water-cooled nuclear power plants  

SciTech Connect (OSTI)

The report examines the differences between the existing and proposed Appendix J and identifies eleven substantive areas where quantifiable impacts will likely result. The analysis indicated that there are four areas of change which tend to dominate all others in terms of cost impacts. The applicable paragraph numbers from Draft E2 of the Appendix J revision and the nature of the change follows: III.A(4) and III.A(6) - Test Pressure and Testing at Reduced Pressure No Longer Allowed; III.A(7)(b)(i) Acceptance Criteria 1.0 L/sub a/ Acceptable ''As Found'' Leakage; III.A(8)(2) Retesting Following Failure of ''As Found'' Type A Test - Corrective Action Plan, and III.A(8)(b)(ii) Option To Do More Frequent Type B and C Testing Rather Than More Type A Penalty Tests. The best estimate is that the proposed Appendix J would result in a cost savings ranging from about $100 million to $160 million, and increase routing occupational exposure on the order of 10,000 person-rem. These estimates capture the total impact to industry and the NRC over the assumed operating life of all existing and planned future power reactors. All dollar impacts projected to occur in future years have been present worthed at discount rates ranging from 5% to 10%.

Sciacca, F.; Nelson, W.; Simpkins, B.; Riordan, B.; Godfrey, P.; Cohen, S.; Beal, S.; Goldin, D.

1985-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CURRENT TESTING ACTIVITIES AT THE ACRELAB RENEWABLE ENERGY SYSTEMS TEST FACILITY , E S Spooner2  

E-Print Network [OSTI]

, AUSTRALIA 2 University of New South Wales, Kensington, NSW, AUSTRALIA 3 Australian CRC for Renewable Energy in a minimum of time. ACRELab was originally conceived as a laboratory for testing remote area power supply and RAPS system components such as inverters. With the growing interest in Grid-connected inverters

102

Testing the quasi-absolute method in photon activation analysis  

SciTech Connect (OSTI)

In photon activation analysis (PAA), relative methods are widely used because of their accuracy and precision. Absolute methods, which are conducted without any assistance from calibration materials, are seldom applied for the difficulty in obtaining photon flux in measurements. This research is an attempt to perform a new absolute approach in PAA - quasi-absolute method - by retrieving photon flux in the sample through Monte Carlo simulation. With simulated photon flux and database of experimental cross sections, it is possible to calculate the concentration of target elements in the sample directly. The QA/QC procedures to solidify the research are discussed in detail. Our results show that the accuracy of the method for certain elements is close to a useful level in practice. Furthermore, the future results from the quasi-absolute method can also serve as a validation technique for experimental data on cross sections. The quasi-absolute method looks promising.

Sun, Z. J. [Chemical Sciences and Engineering Division, Argonne National Laboratory, 9700 S. Cass Ave., Argonne, IL 60439 (United States); Wells, D. [Physics Department, South Dakota School of Mines and Technology, 501 E. Saint Joseph St. Rapid City, SD 57701 (United States); Starovoitova, V.; Segebade, C. [Idaho Accelerator Center, Idaho State University, 921 S. 8th Ave. Pocatello, ID 83209 (United States)

2013-04-19T23:59:59.000Z

103

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS)  

E-Print Network [OSTI]

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS) Sunjaya the photodiode and readout transistors into two parallel operating devices, while keeping a common row select-tolerant photodiode APS was designed and fabricated using a CMOS 0.18µm process. Testing included both fully

Chapman, Glenn H.

104

Mechanically versus electro-magnetically braked cycle ergometer: performance and energy cost of the Wingate Anaerobic Test  

Science Journals Connector (OSTI)

Performance and metabolic profiles of the Wingate Anaerobic Test (WAnT) were compared between a mechanically resisted (ME) and an electro-magnetically braked (EE) cycle ergometer. Fifteen healthy subjects (24....

D. Micklewright; A. Alkhatib; R. Beneke

2006-04-01T23:59:59.000Z

105

Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing Oxygen Reduction Reaction Activity Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique Date: Tuesday, March 12, 2013 Innovation for Our Energy Future Shyam S. Kocha: NREL Yannick Garsany: EXCET/NRL Deborah Myers: ANL https://www1.eere.energy.gov/hydrogenandfuelcells/webinars.html Outline 1) Background 2) Experimental Aspects of RDE Testing 3) Basic Measurement Technique & Analysis 4) Parameters Affecting RDE Activity Measurements 1) Impact of Film Deposition & Drying Techniques 2) Impact of Ink Formulation 3) Impact of Nafion Incorporation 4) Impact of particle size effects 5) Correlation with MEA data 5) Electrocatalyst Durability using RDE Measurements 6) Summary 2 Background PEMFC MEA Thin-film RDE Trends of activity and durability in Rotating Disc Electrode (RDE)

106

Round-robin testing of a reference glass for low-activity waste forms  

SciTech Connect (OSTI)

A round robin test program was conducted with a glass that was developed for use as a standard test material for acceptance testing of low-activity waste glasses made with Hanford tank wastes. The glass is referred to as the low-activity test reference material (LRM). The program was conducted to measure the interlaboratory reproducibility of composition analysis and durability test results. Participants were allowed to select the methods used to analyze the glass composition. The durability tests closely followed the Product Consistency Test (PCT) Method A, except that tests were conducted at both 40 and 90 C and that parallel tests with a reference glass were not required. Samples of LRM glass that had been crushed, sieved, and washed to remove fines were provided to participants for tests and analyses. The reproducibility of both the composition and PCT results compare favorably with the results of interlaboratory studies conducted with other glasses. From the perspective of reproducibility of analysis results, this glass is acceptable for use as a composition standard for nonradioactive components of low-activity waste forms present at >0.1 elemental mass % and as a test standard for PCTS at 40 and 90 C. For PCT with LRM glass, the expected test results at the 95% confidence level are as follows: (1) at 40 C: pH = 9.86 {+-} 0.96; [B] = 2.30 {+-} 1.25 mg/L; [Na] = 19.7 {+-} 7.3 mg/L; [Si] = 13.7 {+-} 4.2 mg/L; and (2) at 90 C: pH = 10.92 {+-} 0.43; [B] = 26.7 {+-} 7.2 mg/L; [Na] = 160 {+-} 13 mg/L; [Si] = 82.0 {+-} 12.7 mg/L. These ranges can be used to evaluate the accuracy of PCTS conducted at other laboratories.

Ebert, W. L.; Wolf, S. F.

1999-12-06T23:59:59.000Z

107

Avoidable waste management costs  

SciTech Connect (OSTI)

This report describes the activity based costing method used to acquire variable (volume dependent or avoidable) waste management cost data for routine operations at Department of Energy (DOE) facilities. Waste volumes from environmental restoration, facility stabilization activities, and legacy waste were specifically excluded from this effort. A core team consisting of Idaho National Engineering Laboratory, Los Alamos National Laboratory, Rocky Flats Environmental Technology Site, and Oak Ridge Reservation developed and piloted the methodology, which can be used to determine avoidable waste management costs. The method developed to gather information was based on activity based costing, which is a common industrial engineering technique. Sites submitted separate flow diagrams that showed the progression of work from activity to activity for each waste type or treatability group. Each activity on a flow diagram was described in a narrative, which detailed the scope of the activity. Labor and material costs based on a unit quantity of waste being processed were then summed to generate a total cost for that flow diagram. Cross-complex values were calculated by determining a weighted average for each waste type or treatability group based on the volume generated. This study will provide DOE and contractors with a better understanding of waste management processes and their associated costs. Other potential benefits include providing cost data for sites to perform consistent cost/benefit analysis of waste minimization and pollution prevention (WMIN/PP) options identified during pollution prevention opportunity assessments and providing a means for prioritizing and allocating limited resources for WMIN/PP.

Hsu, K.; Burns, M.; Priebe, S.; Robinson, P.

1995-01-01T23:59:59.000Z

108

Post?installation activities in the Comprehensive Nuclear Test Ban Treaty (CTBT) International Monitoring System (IMS) infrasound network  

Science Journals Connector (OSTI)

The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear?Test?Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network to repair faulty equipment and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently 11 of the 60 IMS infrasound stations are transmitting data in the post?installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post?certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post?installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost?efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations as well as Configuration Management and Network Sustainment.

2002-01-01T23:59:59.000Z

109

Benefit-cost in a Benevolent Society  

E-Print Network [OSTI]

that there is a well-de?ned cost function C( y) for publicthe private values bene?t-cost test, but is potentiallythe private values bene?t-cost test, Lemma 4 implies y-

Bergstrom, Ted

2005-01-01T23:59:59.000Z

110

Cost Containment  

Science Journals Connector (OSTI)

Cost containment in health care involves awide ... , the growth rate of expenditure or certain costs of health care services. These measures include ... patient education, etc. The reasons for increased cost ...

2008-01-01T23:59:59.000Z

111

Pilot-scale treatability testing -- Recycle, reuse, and disposal of materials from decontamination and decommissioning activities: Soda blasting demonstration  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is in the process of defining the nature and magnitude of decontamination and decommissioning (D and D) obligations at its sites. With disposal costs rising and available storage facilities decreasing, DOE is exploring and implementing new waste minimizing D and D techniques. Technology demonstrations are being conducted by LMES at a DOE gaseous diffusion processing plant, the K-25 Site, in Oak Ridge, Tennessee. The gaseous diffusion process employed at Oak Ridge separated uranium-235 from uranium ore for use in atomic weapons and commercial reactors. These activities contaminated concrete and other surfaces within the plant with uranium, technetium, and other constituents. The objective of current K-25 D and D research is to make available cost-effective and energy-efficient techniques to advance remediation and waste management methods at the K-25 Site and other DOE sites. To support this objective, O`Brien and Gere tested a decontamination system on K-25 Site concrete and steel surfaces contaminated with radioactive and hazardous waste. A scouring system has been developed that removes fixed hazardous and radioactive surface contamination and minimizes residual waste. This system utilizes an abrasive sodium bicarbonate medium that is projected at contaminated surfaces. It mechanically removes surface contamination while leaving the surface intact. Blasting residuals are captured and dissolved in water and treated using physical/chemical processes. Pilot-scale testing of this soda blasting system and bench and pilot-scale treatment of the generated residuals were conducted from December 1993 to September 1994.

NONE

1995-08-01T23:59:59.000Z

112

Testing for fault activity at Yucca Mountain, Nevada, using independent GPS results from the BARGEN network  

E-Print Network [OSTI]

Testing for fault activity at Yucca Mountain, Nevada, using independent GPS results from the BARGEN June 2006; published 19 July 2006. [1] Data from BARGEN GPS stations around Yucca Mountain (YM) have at Yucca Mountain, Nevada, using independent GPS results from the BARGEN network, Geophys. Res. Lett., 33

Blewitt, Geoffrey

113

Testing Geometrical Discrimination within an Enzyme Active Site: Constrained Hydrogen Bonding in the Ketosteroid  

E-Print Network [OSTI]

Testing Geometrical Discrimination within an Enzyme Active Site: Constrained Hydrogen Bonding, Stanford UniVersity, Stanford, California 94305, and Departments of Biochemistry and Chemistry-chain reorientation and prevent hydrogen bond shortening by 0.1 ? or less. Further, this constraint has substantial

Herschlag, Dan

114

Low-Cost Microchannel Heat Exchanger  

Broader source: Energy.gov (indexed) [DOE]

psi pressure capability High effectiveness > 90% 80% lower estimated external heat loss 60% estimated lower cost Complete remaining tests and refine cost...

115

Cost Estimator  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a senior cost and schedule estimator who is responsible for preparing life-cycle cost and schedule estimates and analyses associated with the...

116

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

117

Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Field TesTing oF AcTivATed cArbon Field TesTing oF AcTivATed cArbon injecTion opTions For Mercury conTrol AT TXu's big brown sTATion Background The 2005 Clean Air Mercury Rule will require significant reductions in mercury emissions from coal-fired power plants. Lignite coal is unique because of its highly variable ash content (rich in alkali and alkaline-earth elements), high moisture levels, low chlorine content, and high calcium content. Unique to Texas lignite coals are relatively high iron and selenium concentrations. When combusting Texas lignite coals, up to 80 percent of the mercury in the flue gas is present as elemental mercury, which is not readily captured by downstream pollution control devices. To better understand the factors that influence mercury control at units firing

118

Nuclear Rocket Test Facility Decommissioning Including Controlled Explosive Demolition of a Neutron-Activated Shield Wall  

SciTech Connect (OSTI)

Located in Area 25 of the Nevada Test Site, the Test Cell A Facility was used in the 1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program. The facility was decontaminated and decommissioned (D&D) in 2005 using the Streamlined Approach For Environmental Restoration (SAFER) process, under the Federal Facilities Agreement and Consent Order (FFACO). Utilities and process piping were verified void of contents, hazardous materials were removed, concrete with removable contamination decontaminated, large sections mechanically demolished, and the remaining five-foot, five-inch thick radiologically-activated reinforced concrete shield wall demolished using open-air controlled explosive demolition (CED). CED of the shield wall was closely monitored and resulted in no radiological exposure or atmospheric release.

Michael Kruzic

2007-09-01T23:59:59.000Z

119

Cost Shifting  

Science Journals Connector (OSTI)

Abstract Cost shifting exists when a provider raises prices for one set of buyers because it has lowered prices for some other buyer. In theory, cost shifting can take place only if providers have unexploited market power. The empirical evidence on the extent of cost shifting is mixed. Taken as a whole, the evidence does not support the claims that cost shifting is a large and pervasive feature of the US health-care markets. At most, one can argue that perhaps one-fifth of Medicare payment reductions have been passed on to private payers. The majority of the rigorous studies, however, have found no evidence of cost shifting.

M.A. Morrisey

2014-01-01T23:59:59.000Z

120

Decommissioning Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

Sanford, P. C.; Stevens, J. L.; Brandt, R.

2002-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

cost savings  

National Nuclear Security Administration (NNSA)

reduced the amount of time involved in the annual chemical inventory for a cost savings of 18,282. Other presentations covered SRNS' award-winning employee suggestion...

122

BPA's Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPAsCosts Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance & Rates...

123

Vehicle Technologies Office Merit Review 2014: Overview and Progress of the Battery Testing, Design and Analysis Activity  

Broader source: Energy.gov [DOE]

Presentation given by the Department of Energy's Energy Storage area at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about the battery testing, design, and analysis activity.

124

Summary of activities of the life cycle costing workshop conducted by the Environmental Restoration Program of Oak Ridge National Laboratory  

SciTech Connect (OSTI)

A five-day life cycle workshop was conducted by the Environmental Restoration (FR) Program of Oak Ridge National Laboratory (ORNL) to develop appropriate remediation scenarios for each Waste Area Grouping (WAG) at ORNL and to identify associated data needs (e.g., remedial investigations, special studies, and technology demonstrations) and required interfaces. Workshop participants represented the Department of Energy, Martin Marietta Energy Systems, Inc., Bechtel National, Radian Corporation, EBASCO Corporation, and M-K Ferguson. The workshop was used to establish a technical basis for remediation activities at each WAG. The workshop results are documented in this report and provide the baseline for estimating the technical scope for each WAG. The scope and associated budgets and schedules will be summarized in baseline reports for each WAG, which, in turn, will be compiled into an overall strategy document for ORNL ER.

Not Available

1992-08-01T23:59:59.000Z

125

Laboratory Evaporation Testing Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant  

SciTech Connect (OSTI)

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream, LAW Off-Gas Condensate, from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of canistered glass waste forms. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to be within acceptable concentration ranges in the LAW glass. Diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the impact of potential future disposition of this stream in the Hanford tank farms, and investigates auxiliary evaporation to enable another disposition path. Unless an auxiliary evaporator is used, returning the stream to the tank farms would require evaporation in the 242-A evaporator. This stream is expected to be unusual because it will be very high in corrosive species that are volatile in the melter (chloride, fluoride, sulfur), will have high ammonia, and will contain carryover particulates of glass-former chemicals. These species have potential to cause corrosion of tanks and equipment, precipitation of solids, release of ammonia gas vapors, and scale in the tank farm evaporator. Routing this stream to the tank farms does not permanently divert it from recycling into the WTP, only temporarily stores it prior to reprocessing. Testing is normally performed to demonstrate acceptable conditions and limits for these compounds in wastes sent to the tank farms. The primary parameter of this phase of the test program was measuring the formation of solids during evaporation in order to assess the compatibility of the stream with the evaporator and transfer and storage equipment. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW facility melter offgas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet, and, thus, the composition will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. This report discusses results of evaporation testing of the simulant. Two conditions were tested, one with the simulant at near neutral pH, and a second at alkaline pH. The neutral pH test is comparable to the conditions in the Hanford Effluent Treatment Facility (ETF) evaporator, although that evaporator operates at near atmospheric pressure and tests were done under vacuum. For the alkaline test, the target pH was based on the tank farm corrosion control program requirements, and the test protocol and equipment was comparable to that used for routine evaluation of feed compatibility studies for the 242-A evaporator. One of the

Adamson, Duane J.; Nash, Charles A.; McCabe, Daniel J.; Crawford, Charles L.; Wilmarth, William R.

2014-01-27T23:59:59.000Z

126

IEEE Transactions on Software Engineering (to appear). Empirical Studies of a Prediction Model for Regression Test  

E-Print Network [OSTI]

for Regression Test Selection Mary Jean Harrold 1 David Rosenblum 2 Gregg Rothermel 3 Elaine Weyuker 4 Abstract Regression testing is an important activity that can account for a large proportion of the cost of software maintenance. One approach to reducing the cost of regression testing is to employ a selective regression

Rothermel, Gregg

127

Design and Test of an Event Detector for the ReflectoActive Seals System  

SciTech Connect (OSTI)

The purpose of this thesis was to research, design, develop and test a novel instrument for detecting fiber optic loop continuity and spatially locating fiber optic breaches. The work is for an active seal system called ReflectoActive Seals whose purpose is to provide real time container tamper indication. A Field Programmable Gate Array was used to implement a loop continuity detector and a spatial breach locator based on a high acquisition speed single photon counting optical time domain reflectometer. Communication and other control features were added in order to create a usable instrument that met defined requirements. A host graphical user interface was developed to illustrate system use and performance. The resulting device meets performance specifications by exhibiting a dynamic range of 27dB and a spatial resolution of 1.5 ft. The communication scheme used expands installation options and allows the device to communicate to a central host via existing Local Area Networks and/or the Internet.

Stinson, Brad J [ORNL

2006-05-01T23:59:59.000Z

128

Design and Test of an Event Detector and Locator for the ReflectoActive Seals System  

SciTech Connect (OSTI)

The purpose of this work was to research, design, develop and test a novel instrument for detecting fiber optic loop continuity and spatially locating fiber optic breaches. The work is for an active seal system called ReflectoActive{trademark} Seals whose purpose is to provide real time container tamper indication. A Field Programmable Gate Array was used to implement a loop continuity detector and a spatial breach locator based on a high acquisition speed single photon counting optical time domain reflectometer. Communication and other control features were added in order to create a usable instrument that met defined requirements. A host graphical user interface was developed to illustrate system use and performance. The resulting device meets performance specifications by exhibiting a dynamic range of 27dB and a spatial resolution of 1.5 ft. The communication scheme used expands installation options and allows the device to communicate to a central host via existing Local Area Networks and/or the Internet.

Stinson, Brad J [ORNL

2006-06-01T23:59:59.000Z

129

Energy-efficiency testing activities of the Mobile Energy Laboratory - Semiannual Report: April 1, 1990, Through September 30, 1990  

SciTech Connect (OSTI)

This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the third and fourth quarters of fiscal year (FY) 1990. The MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at federal facilities. MELs are equipped for the on-site evaluation of energy use efficiency. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities. This report describes the testing, test results, and suggested courses of action.

Parker, G.B.; Currie, J.W.

1991-03-01T23:59:59.000Z

130

A data base and a standard material for use in acceptance testing of low-activity waste products  

SciTech Connect (OSTI)

The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material.

Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

1998-04-01T23:59:59.000Z

131

SUMMARY of the PORTLAND DISTRICT VE STUDIES related to Fish Activities CENWP Status of Participants in the study Days to Cost for only Net Project Project  

E-Print Network [OSTI]

of Participants in the study Days to Cost for only Net Project Project VE ID # Description of the Study Contract

132

Electricity costs  

Science Journals Connector (OSTI)

... index is used to correct for inflation. The short answer is given by the Central Electricity Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The ... Generating Board's (CEGB's) 1980-81 report, paragraph 168. "The cost per kWh of fuel. . . rose by 18.6 per cent (between 1979 ...

J.W. JEFFERY

1982-03-18T23:59:59.000Z

133

TESTING DIAGNOSTICS OF NUCLEAR ACTIVITY AND STAR FORMATION IN GALAXIES AT z > 1  

SciTech Connect (OSTI)

We present some of the first science data with the new Keck/MOSFIRE instrument to test the effectiveness of different AGN/SF diagnostics at z {approx} 1.5. MOSFIRE spectra were obtained in three H-band multi-slit masks in the GOODS-S field, resulting in 2 hr exposures of 36 emission-line galaxies. We compare X-ray data with the traditional emission-line ratio diagnostics and the alternative mass-excitation and color-excitation diagrams, combining new MOSFIRE infrared data with previous HST/WFC3 infrared spectra (from the 3D-HST survey) and multiwavelength photometry. We demonstrate that a high [O III]/H{beta} ratio is insufficient as an active galactic nucleus (AGN) indicator at z > 1. For the four X-ray-detected galaxies, the classic diagnostics ([O III]/H{beta} versus [N II]/H{alpha} and [S II]/H{alpha}) remain consistent with X-ray AGN/SF classification. The X-ray data also suggest that 'composite' galaxies (with intermediate AGN/SF classification) host bona fide AGNs. Nearly {approx}2/3 of the z {approx} 1.5 emission-line galaxies have nuclear activity detected by either X-rays or the classic diagnostics. Compared to the X-ray and line ratio classifications, the mass-excitation method remains effective at z > 1, but we show that the color-excitation method requires a new calibration to successfully identify AGNs at these redshifts.

Trump, Jonathan R.; Barro, Guillermo; Koo, David C.; Faber, S. M. [University of California Observatories/Lick Observatory and Department of Astronomy and Astrophysics, University of California, Santa Cruz, CA 95064 (United States); Konidaris, Nicholas P. [Cahill Center for Astronomy and Astrophysics, California Institute of Technology, MC 105-24, 1200 East California Boulevard, Pasadena, CA 91125 (United States); Kocevski, Dale D.; Yan, Renbin [Department of Physics and Astronomy, University of Kentucky, Lexington, KY 40506 (United States); Juneau, Stephanie [Irfu/Service d'Astrophysique, CEA-Saclay, Orme des Merisiers, F-91191 Gif-sur-Yvette Cedex (France); Weiner, Benjamin J. [Steward Observatory, University of Arizona, 933 North Cherry Avenue, Tucson, AZ 85721 (United States); McLean, Ian S. [Department of Physics and Astronomy, UCLA, Los Angeles, CA 90095 (United States); Perez-Gonzalez, Pablo G.; Villar, Victor [Departamento de Astrofisica, Facultad de CC. Fisicas, Universidad Complutense de Madrid, E-28040 Madrid (Spain)

2013-01-20T23:59:59.000Z

134

Wind Tunnel and Flight Testing of Active Flow Control on a UAV  

E-Print Network [OSTI]

Active flow control has been extensively explored in wind tunnel studies but successful in-flight implementation of an active flow control technology still remains a challenge. This thesis presents implementation of active flow control technology...

Babbar, Yogesh

2011-08-08T23:59:59.000Z

135

Iodine Adsorption on Ion-Exchange Resins and Activated Carbons Batch Testing  

SciTech Connect (OSTI)

Iodine sorption onto seven resins and six carbon materials was evaluated using water from well 299-W19-36 on the Hanford Site. These materials were tested using a range of solution-to-solid ratios. The test results are as follows: The efficacy of the resin and granular activated carbon materials was less than predicted based on manufacturers performance data. It is hypothesized that this is due to the differences in speciation previously determined for Hanford groundwater. The sorption of iodine is affected by the iodine species in the source water. Iodine loading on resins using source water ranged from 1.47 to 1.70 g/g with the corresponding Kd values from 189.9 to 227.0 mL/g. The sorption values when the iodine is converted to iodide ranged from 2.75 to 5.90 g/g with the corresponding Kd values from 536.3 to 2979.6 mL/g. It is recommended that methods to convert iodine to iodide be investigated in fiscal year (FY) 2015. The chemicals used to convert iodine to iodate adversely affected the sorption of iodine onto the carbon materials. Using as-received source water, loading and Kd values ranged from 1.47 to 1.70 g/g and 189.8 to 226.3 mL/g respectively. After treatment, loading and Kd values could not be calculated because there was little change between the initial and final iodine concentration. It is recommended the cause of the decrease in iodine sorption be investigated in FY15. In direct support of CH2M HILL Plateau Remediation Company, Pacific Northwest National Laboratory has evaluated samples from within the 200W pump and treat bioreactors. As part of this analysis, pictures taken within the bioreactor reveal a precipitate that, based on physical properties and known aqueous chemistry, is hypothesized to be iron pyrite or chalcopyrite, which could affect iodine adsorption. It is recommended these materials be tested at different solution-to-solid ratios in FY15 to determine their effect on iodine sorption.

Parker, Kent E.; Golovich, Elizabeth C.; Wellman, Dawn M.

2014-09-30T23:59:59.000Z

136

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

first cost or capital investment): ­ Expenditures made to acquire or develop capital assets ­ Three main· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable) costs apply

Boisvert, Jeff

137

Types of Costs Types of Cost Estimates  

E-Print Network [OSTI]

-Revenue Relationships · Capital Costs (or first cost or capital investment): ­ Expenditures made to acquire or develop05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408 ­ off-site management or corporate level expenditure · Direct vs. Indirect Costs ­ Direct (or variable

Boisvert, Jeff

138

Interactions between caffeine and cocaine in tests of motor activity: role of the adenosine A2 receptor  

E-Print Network [OSTI]

; Choi et al, 1988). However, doses of caffeine (50 to 100 uM) which markedly increase exploratory behavior are too low to effectively inhibit phosphodiesterase (Thithapandha et al. , 1972). Indeed, most potent phosphodiesterase inhibitors such as RO... measure of horizontal activity. For experiments 2 and 3 an automated Digiscan-16 system was used for the behavioral testing. The system included four optical beam activity monitors (Model E61-32; Coulbourn Instrs. , Inc. , Lehigh Valley, PA) comprised...

Snow, Steven Wayne

2012-06-07T23:59:59.000Z

139

AVTA: PHEV Demand and Energy Cost Demonstration Report  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from a demonstration with Tacoma Power on plug-in hybrid electric vehicle demand and energy cost, as informed by the AVTA's testing on plug-in electric vehicle charging equipment. This research was conducted by Idaho National Laboratory.

140

Summary of well-testing activities at Lawrence Berkeley Laboratory, 1975-1983  

SciTech Connect (OSTI)

Well test data collected from various geothermal fields by the geothermal group at Lawrence Berkeley Laboratory are presented. The type of well tests conducted, the instrumentation used and the data collected are described. Experience gained through interpretation of the data has helped identify problems in test procedures and interpretative methods.

Bodvarsson, M.G.; Benson, S.M.

1983-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Estimating Specialty Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

1997-03-28T23:59:59.000Z

142

Direct costing  

E-Print Network [OSTI]

oau 5e reduced. Under the same oonOitions, even ~Me on a bread scale entails not mere1y the conduct of the direct oyeraticns cf yrccessing the materials into finished products, but also the performance of auxiliary functions. these may 'ba power y... purposes have been advanced as folkway le Most of a o03RyaxO' 8 products Grc usual13r sold at prices which oovex' full product costs y plus 861ling a%el administrative expenses, plus normal profit. The inventoi~ valuate. on should be consistent...

Browning, Donald Bullock

2012-06-07T23:59:59.000Z

143

Cost Analysis Rate Settin  

E-Print Network [OSTI]

Cost Analysis and Rate Settin for Animal Research Facilities #12;#12;Cost Analysis and Rate ... .. . ...................... . . . ................................. . .... 7 Chapter 2 Preparation for Cost Analysis ......................................................... 9 Chapter 3 Assignment of Costs to Animal Research Facility Cost Centers

Baker, Chris I.

144

Cost Sharing What is Cost Sharing?  

E-Print Network [OSTI]

1 Cost Sharing What is Cost Sharing? x Cost sharing is a commitment to use university resources and Expenses o Equipment x Committing to cost share is highly discouraged unless required by the sponsoring agency x Tracking of committed cost share is required to meet federal regulations (OMB A-110) x UCSD has

Tsien, Roger Y.

145

Cost Sharing Basics Definitions  

E-Print Network [OSTI]

Cost Sharing Basics Definitions Some funding agencies require the grantee institution the project costs. Cost sharing is defined as project costs not borne by the sponsor. Cost sharing funds may resources or facilities. If the award is federal, only acceptable non-federal costs qualify as cost sharing

Finley Jr., Russell L.

146

Solar Energy Education. Humanities: activities and teacher's guide. Field test edition  

SciTech Connect (OSTI)

Activities are outlined to introduce students to information on solar energy while performing ordinary classroom work. In this teaching manual solar energy is integrated with the humanities. The activities include such things as stories, newspapers, writing assignments, and art and musical presentations all filled with energy related terms. An energy glossary is provided. (BCS)

Not Available

1982-01-01T23:59:59.000Z

147

FULL-COST ACCOUNTING  

Science Journals Connector (OSTI)

FULL-COST ACCOUNTING ... Environmental costs would be built into a product's cost, and consumers would be able to make informed purchases. ...

1993-01-11T23:59:59.000Z

148

PEM Electrolyzer Incorporating an Advanced Low-Cost Membrane  

SciTech Connect (OSTI)

The Department of Energy (DOE) has identified hydrogen production by electrolysis of water at forecourt stations as a critical technology for transition to the hydrogen economy; however, the cost of hydrogen produced by present commercially available electrolysis systems is considerably higher than the DOE 2015 and 2020 cost targets. Analyses of proton-exchange membrane (PEM) electrolyzer systems indicate that reductions in electricity consumption and electrolyzer stack and system capital cost are required to meet the DOE cost targets. The primary objective is to develop and demonstrate a cost-effective energy-based system for electrolytic generation of hydrogen. The goal is to increase PEM electrolyzer efficiency and to reduce electrolyzer stack and system capital cost to meet the DOE cost targets for distributed electrolysis. To accomplish this objective, work was conducted by a team consisting of Giner, Inc. (Giner), Virginia Polytechnic Institute & University (VT), and domnick hunter group, a subsidiary of Parker Hannifin (Parker). The project focused on four (4) key areas: (1) development of a high-efficiency, high-strength membrane; (2) development of a long-life cell-separator; (3) scale-up of cell active area to 290 cm2 (from 160 cm); and (4) development of a prototype commercial electrolyzer system. In each of the key stack development areas Giner and our team members conducted focused development in laboratory-scale hardware, with analytical support as necessary, followed by life-testing of the most promising candidate materials. Selected components were then scaled up and incorporated into low-cost scaled-up stack hardware. The project culminated in the fabrication and testing of a highly efficient electrolyzer system for production of 0.5 kg/hr hydrogen and validation of the stack and system in testing at the National Renewable Energy Laboratory (NREL).

Hamdan, Monjid [Giner, Inc.] [Giner, Inc.

2013-08-29T23:59:59.000Z

149

U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity, Hydrogen/CNG Blended Fuels Performance Testing in a Ford F-150  

SciTech Connect (OSTI)

Federal regulation requires energy companies and government entities to utilize alternative fuels in their vehicle fleets. To meet this need, several automobile manufacturers are producing compressed natural gas (CNG)-fueled vehicles. In addition, several converters are modifying gasoline-fueled vehicles to operate on both gasoline and CNG (Bifuel). Because of the availability of CNG vehicles, many energy company and government fleets have adopted CNG as their principle alternative fuel for transportation. Meanwhile, recent research has shown that blending hydrogen with CNG (HCNG) can reduce emissions from CNG vehicles. However, blending hydrogen with CNG (and performing no other vehicle modifications) reduces engine power output, due to the lower volumetric energy density of hydrogen in relation to CNG. Arizona Public Service (APS) and the U.S. Department of Energys Advanced Vehicle Testing Activity (DOE AVTA) identified the need to determine the magnitude of these effects and their impact on the viability of using HCNG in existing CNG vehicles. To quantify the effects of using various blended fuels, a work plan was designed to test the acceleration, range, and exhaust emissions of a Ford F-150 pickup truck operating on 100% CNG and blends of 15 and 30% HCNG. This report presents the results of this testing conducted during May and June 2003 by Electric Transportation Applications (Task 4.10, DOE AVTA Cooperative Agreement DEFC36- 00ID-13859).

James E. Francfort

2003-11-01T23:59:59.000Z

150

Power Performance Testing Activities in the DOE-EPRI Turbine Verification Program  

SciTech Connect (OSTI)

As part of the US Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program, Global Energy Concepts (GEC) is engaged in planning and conducting power performance tests for wind turbines in Searsburg, Vermont; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; Kotzebue, Alaska; and Big Spring, Texas. The turbines under investigation include a 550-kW Zond Z-40 FS, a 600-kW Tacke 600e, two 750-kW Zond Z-50s, a 66-kW AOC 15/50, a 660-kW Vestas V-47, and a 1.65-MW Vestas V-66. The testing is performed in a variety of terrain types, including mountains, plains, deserts, and coastal tundra; and under a wide range of atmospheric conditions from arid to arctic. Because one goal of this testing program is to gain experience with the new International Electrotechnical Commission (IEC) 61400-12 standard, all of the measurements are being performed in accordance with this new standard. This paper presents the status of the power performance testing at each site, the methodologies employed, test results available, and lessons learned from the application of the IEC standard. Any sources of uncertainty are discussed, and attention is given to the relative importance of each aspect of the IEC standard in terms of its contribution to the overall measurement uncertainty.

VandenBosche, J.; McCoy, T.; Rhoads, H. (Global Energy Concepts, LLC); McNiff, B. (McNiff Light Industry); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

151

Cost-Effectiveness Ratio  

Science Journals Connector (OSTI)

The cost?effectiveness ratio (CER) is acalculation that summarizes the intervention's net cost and effectiveness. The three types of CER are: the average cost?effectiveness ratio (ACER), the marginal cost?...

2008-01-01T23:59:59.000Z

152

Cost Share-Cost Reimbursement Invoice Format Example | The Ames...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Share-Cost Reimbursement Invoice Format Example Effective Date: 102014 File (public): Cost Share-Cost...

153

Implications of Cost Effectiveness Screening Practices in a Low Natural Gas Price Environment: Case Study of a Midwestern Residential Energy Upgrade Program  

E-Print Network [OSTI]

2012). The PAC test includes costs and benefits from theprogram administrative costs and system benefits, includingtransmission and distribution costs). Test Application Level

Hoffman, Ian M.

2014-01-01T23:59:59.000Z

154

Modeling and Field Test Planning Activities in Support of Disposal of Heat-Generating Waste in Salt  

SciTech Connect (OSTI)

The modeling efforts in support of the field test planning conducted at LBNL leverage on recent developments of tools for modeling coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This work includes development related to, and implementation of, essential capabilities, as well as testing the model against relevant information and published experimental data related to the fate and transport of water. These are modeling capabilities that will be suitable for assisting in the design of field experiment, especially related to multiphase flow processes coupled with mechanical deformations, at high temperature. In this report, we first examine previous generic repository modeling results, focusing on the first 20 years to investigate the expected evolution of the different processes that could be monitored in a full-scale heater experiment, and then present new results from ongoing modeling of the Thermal Simulation for Drift Emplacement (TSDE) experiment, a heater experiment on the in-drift emplacement concept at the Asse Mine, Germany, and provide an update on the ongoing model developments for modeling brine migration. LBNL also supported field test planning activities via contributions to and technical review of framework documents and test plans, as well as participation in workshops associated with field test planning.

Rutqvist, Jonny; Blanco Martin, Laura; Mukhopadhyay, Sumit; Houseworth, Jim; Birkholzer, Jens

2014-09-26T23:59:59.000Z

155

Solar Energy Education. Social studies: activities and teacher's guide. Field test edition  

SciTech Connect (OSTI)

Solar energy information is made available to students through classroom instruction by way of the Solar Energy Education teaching manuals. In this manual solar energy, as well as other energy sources like wind power, is introduced by performing school activities in the area of social studies. A glossary of energy related terms is included. (BCS)

Not Available

1982-01-01T23:59:59.000Z

156

Testing for Trend in North Atlantic Hurricane Activity, 190098  

Science Journals Connector (OSTI)

The detection of a trend in hurricane activity in the North Atlantic basin has been restricted by the incompleteness of the record prior to 1946. In an earlier paper, the complete record of U.S. landfalling hurricanes was used to extend the ...

Andrew R. Solow; Laura J. Moore

2002-11-01T23:59:59.000Z

157

Low-Cost Production of Hydrogen and Electricity  

Office of Energy Efficiency and Renewable Energy (EERE)

Bloom Energy is testing the potential to produce low-cost hydrogen and electricity simultaneously from natural gas.

158

Residential photovoltaic systems costs  

SciTech Connect (OSTI)

A study of costs associated with the installation and operation of a residential photovoltaic system has been conducted to determine present and projected (1986) status. As a basis for the study, a residential photovoltaic system design projected for 1986 was assumed, consisting of two principal components: a roof-mounted array and a utility-interactive inverter. The scope of the study encompassed both silicon and cadmium sulfide photovoltaic modules. Cost estimates were obtained by a survey and study of reports generated by companies and agencies presently active in each of the subsystem area. Where necessary, supplemental estimates were established as part of this study. The range of estimates for silicon-based systems strongly suggest that such systems will be competitive for new installations and reasonably competitive for retrofit applications. The cadmium-sulfide-based system cost estimates, which are less certain than those for silicon, indicate that these systems will be marginally competitive with silicon-based systems for new construction, but not competitive for retrofit applications. Significant variations from the DOE system price sub-goals were found, however, particularly in the areas of array mounting, wiring and cleaning. Additional development work appears needed in these areas.

Cox, C.H. III

1980-01-01T23:59:59.000Z

159

Cost Model and Cost Estimating Software  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

1997-03-28T23:59:59.000Z

160

Low-cost inertial measurement unit.  

SciTech Connect (OSTI)

Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

Deyle, Travis Jay

2005-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Research and Development of a Low Cost Solar Collector  

SciTech Connect (OSTI)

This is a Final Technical Report on the Research and Development completed towards the development of a Low Cost Solar Collector conducted under the DOE cost-sharing award EE-0003591. The objective of this project was to develop a new class of solar concentrators with geometries and manufacturability that could significantly reduce the fully installed cost of the solar collector field for concentrated solar thermal power plants. The goal of the project was to achieve an aggressive cost target of $170/m2, a reduction of up to 50% in the total installed cost of a solar collector field as measured against the current industry benchmark of a conventional parabolic trough. The project plan, and the detailed activities conducted under the scope of the DOE Award project addressed all major drivers that affect solar collector costs. In addition to costs, the study also focused on evaluating technical performance of new collector architectures and compared them to the performance of the industry benchmark parabolic trough. The most notable accomplishment of this DOE award was the delivery of a full-scale integrated design, manufacturing and field installation solution for a new class of solar collector architecture which has been classified as the Bi-Planar Fresnel Collector (BPFC) and may be considered as a viable alternative to the conventional parabolic trough, as well as the conventional Fresnel collectors. This was in part accomplished through the design and development, all the way through fabrication and test validation of a new class of Linear Planar Fresnel Collector architecture. This architecture offers a number of key differentiating features which include a planar light-weight frame geometry with small mass-manufacturable elements utilizing flat mirror sections. The designs shows significant promise in reducing the material costs, fabrication costs, shipping costs, and on-site field installation costs compared to the benchmark parabolic trough, as well as the conventional Fresnel collector. The noteworthy design features of the BPFC architecture include the use of relatively cheaper flat mirrors and a design which allows the mirror support beam sections to act as load-bearing structural elements resulting in more than a 36% reduction in the overall structural weight compared to an optimized parabolic trough. Also, it was shown that the utilization of small mass-produced elements significantly lowers mass-production and logistics costs that can more quickly deliver economies of scale, even for smaller installations while also reducing shipping and installation costs. Moreover, unlike the traditional Fresnel trough the BPFC architecture does not require complex articulating drive mechanisms but instead utilizes a standard parabolic trough hydraulic drive mechanism. In addition to the development of the Bi-Planar Fresnel Collector, an optimized conventional space-frame type parabolic trough was also designed, built, analyzed and field-tested during the first phase of this award. The design of the conventional space-frame parabolic collector was refined with extensive FEA and CFD analysis to reduce material costs and re-designed for simpler fabrication and more accurate lower-cost field assembly. This optimized parabolic trough represented an improvement over the state-of-the art of the traditional parabolic trough architecture and also served as a more rigorous and less subjective benchmark that was used for comparison of new candidate design architectures. The results of the expanded 1st phase of the DOE award project showed that both the Optimized Parabolic Trough and the new Bi-Planar Fresnel Collector design concepts failed to meet the primary objectives for the project of achieving a 50% cost reduction from the industry reference total installed cost of $350/m2. Results showed that the BPFC came in at projected total installed cost of $237/m2 representing a 32% savings compared to the industry benchmark conventional parabolic trough. And the cost reduction obtained by the Optimized Parabolic Trough compared to the

Ansari, Asif; Philip, Lee; Thouppuarachchi, Chirath

2012-08-01T23:59:59.000Z

162

NETL: Mercury Emissions Control Technologies - Assessment Of Low Cost Novel  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Assessment Of Low Cost Novel Mercury Sorbents Assessment Of Low Cost Novel Mercury Sorbents Project Summary: Apogee Scientific Inc. will assess up to a dozen carbon-based and other sorbents that are expected to remove more than 90 percent of mercury and cost 40 to 75 percent less than commercial sorbents because they feature inexpensive precursors and simple activation steps. Six to 12 sorbents will undergo fixed-bed adsorption tests with the most promising three to six being further evaluated by injecting them into a pilot-scale electrostatic precipitator and baghouse. Commercial flue gas desulfurization activated carbon will provide the baseline for comparisons. A portable pilot system will be constructed and would accommodate a slipstream ESP or baghouse at minimal cost. Tests will be conducted at Wisconsin Electric's Valley power plant in Milwaukee, WI, and Midwest Generation's Powerton Station in Pekin, IL. The project team consists of URS Radian, Austin, TX; the Electric Power Research Institute, Palo Alto, CA; the Illinois State Geological Survey, Champaign, IL; ADA Environmental Solutions, Littleton, CO; and Physical Sciences Inc., Andover, MA.

163

Active dc filter for HVDC system--A test installation in the Konti-Skan DC link at Lindome converter station  

SciTech Connect (OSTI)

The purpose of introducing active dc filters is to meet the more and more stringent requirement from power utilities on limiting telephone interference caused by harmonic currents from HVdc transmission lines, without unnecessarily increasing the cost of HVdc stations. An active dc filter installed in the Konti-Skan HVdc link is described. The active dc filter is connected at the bottom of an existing passive dc filter at the Lindome station. The active dc filter includes optic harmonic current measuring unit, control system, protection and supervision system, PWM power amplifier, high-frequency transformer, surge arrester, and coupling apparatuses. The active dc filter has small physical size and occupies small ground area. The performance of the active dc filter for eliminating the disturbing harmonics is excellent. To achieve comparable results by passive filters would require something like ten times more high voltage equipment.

Zhang, Wenyan; Asplund, G. (ABB Power Systems, Ludvika (Sweden). HVDC Division); Aberg, A. (ABB Corporate Research, Lund (Sweden). Dept. of Man-Machine Communication); Jonsson, U. (Svenska Kraftnaet, Vaellingby (Sweden)); Loeoef, O. (Vattenfall AB, Trollhaettan (Sweden). Region Vaestsverige)

1993-07-01T23:59:59.000Z

164

Cost Study Manual  

Broader source: Energy.gov (indexed) [DOE]

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

165

Levelized Electricity Costs  

Science Journals Connector (OSTI)

The concept of levelized energy costs responds to the necessity of disclosing the ... in order to recover the total life cycle cost of energy production. This chapter charts the effectiveness of levelized cost fo...

Nuno Luis Madureira

2014-01-01T23:59:59.000Z

166

Low-cost, non-precious metal/polymer composite catalysts for fuel cells  

E-Print Network [OSTI]

will fuel cells take their place as a centerpiece of a hydrogen economy and position hydrogen as a major) activity in known-to-date non- precious metal. Fuel cell testing of the composite Figure 2 shows a hydrogenLow-cost, non-precious metal/polymer composite catalysts for fuel cells R. Bashyam and P. Zelenay 1

167

Geothermal Exploration Cost and Time  

SciTech Connect (OSTI)

The Department of Energys Geothermal Technology Office (GTO) provides RD&D funding for geothermal exploration technologies with the goal of lowering the risks and costs of geothermal development and exploration. The National Renewable Energy Laboratory (NREL) was tasked with developing a metric in 2012 to measure the impacts of this RD&D funding on the cost and time required for exploration activities. The development of this cost and time metric included collecting cost and time data for exploration techniques, creating a baseline suite of exploration techniques to which future exploration cost and time improvements can be compared, and developing an online tool for graphically showing potential project impacts (all available at http://en.openei.org/wiki/Gateway: Geothermal). This paper describes the methodology used to define the baseline exploration suite of techniques (baseline), as well as the approach that was used to create the cost and time data set that populates the baseline. The resulting product, an online tool for measuring impact, and the aggregated cost and time data are available on the Open Energy Information website (OpenEI, http://en.openei.org) for public access. - Published 01/01/2013 by US National Renewable Energy Laboratory NREL.

Scott Jenne

2013-02-13T23:59:59.000Z

168

Methods | Transparent Cost Database  

Open Energy Info (EERE)

information NREL has developed the following cost of energy tools: System Advisor Model (SAM): https:sam.nrel.gov SAM makes performance predictions and cost of...

169

Test Report: Cost Effective Foundation Insulation  

SciTech Connect (OSTI)

A field experiment was conducted to demonstrate and quantify the thermal effectiveness of rigid insulation board when installed on the exterior of a buried concrete foundation wall. A heated, insulated box was constructed along one wall of an existing, unheated building to simulate the living space of a home. The crawl space beneath the living space was divided into two sections. One featured external foundation insulation, while the other side had none. 36 temperature and heat flux sensors were installed at predetermined locations to measure the temperature profile and heat flow out of the living space. The temperature profile through the foundation was then used to calculate the total heat flow out of the foundation for both cases. This experiment showed that a significant energy savings is available with exterior foundation insulation. Over the course of 3 months, the heat-loss differential between the insulated and non-insulated foundations was 4.95 kilowatt-hours per lineal foot of foundation wall, for a ratio of 3:1. For a 2200 sq. ft home with a foundation perimeter 200 ft. long, this would amount to a savings of 990 kW-hrs in just 3 months, or 330 kW-hrs per month. Extrapolating to an 8-month heating year, we would expect to save over 2640 kW-hrs per year for such a home. The savings for a basement foundation, rather than a crawlspace, would be approach twice that amount, nearing 5280 kW-hr per year. Because these data were not collected during the coldest months of the year, they are conservative, and greater savings may be expected during colder periods.

Jeffrey M. Lacy; T. E. Rahl; G. A. Twitchell; R. G. Kobbe

2003-06-01T23:59:59.000Z

170

Highly Insulating Windows - Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

171

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Broader source: Energy.gov (indexed) [DOE]

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

172

PRESSURE ACTIVATED SEALANT TECHNOLOGY  

SciTech Connect (OSTI)

The objective of this project is to develop new, efficient, cost effective methods of internally sealing natural gas pipeline leaks through the application of differential pressure activated sealants. In researching the current state of the art for gas pipeline sealing technologies we concluded that if the project was successful, it appeared that pressure activated sealant technology would provide a cost effective alternative to existing pipeline repair technology. From our analysis of current field data for a 13 year period from 1985 to 1997 we were able to identify 205 leaks that were candidates for pressure activated sealant technology, affirming that pressure activated sealant technology is a viable option to traditional external leak repairs. The data collected included types of defects, areas of defects, pipe sizes and materials, incident and operating pressures, ability of pipeline to be pigged and corrosion states. This data, and subsequent analysis, was utilized as a basis for constructing applicable sealant test modeling.

Michael A. Romano

2004-04-01T23:59:59.000Z

173

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

174

Cost Estimation Package  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

1997-03-28T23:59:59.000Z

175

Life Cycle Cost Estimate  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

1997-03-28T23:59:59.000Z

176

A chronicle of costs  

SciTech Connect (OSTI)

This report contains the history of all estimated costs associated with the superconducting super collider.

Elioff, T.

1994-04-01T23:59:59.000Z

177

NREL: Water Power Research - Testing and Standards  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing and Standards Testing and Standards NREL's marine and hydrokinetics (MHK) testing activities provide industry partners with essential operational data on a wide variety of systems and components. This data helps researchers establish baseline cost and performance metrics and advance the technology readiness of those systems that demonstrate the greatest potential for successful commercial deployment. The development of standards leads to accelerated development, reduced risks, and increased access to capital. Examples of testing and standards activities include: Verdant Rotor Blade Development Test Center Support IEC Standards Verdant Rotor Blade Development NREL applied its more than three decades of experience in designing and testing horizontal-axis wind turbine rotors to the development and testing

178

Early Station Costs Questionnaire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

179

Low Cost, Durable Seal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

180

Unit costs of waste management operations  

SciTech Connect (OSTI)

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Operations Cost Allocation Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

182

Verification Testing Test Driven Development Testing with JUnit Verification  

E-Print Network [OSTI]

Verification Testing Test Driven Development Testing with JUnit Verification Any activity should be verified. #12;Verification Testing Test Driven Development Testing with JUnit Approaches to verification 1 Testing 2 Static Analysis · Peer review · Insepction/Walk-through/Structured review · Formal

Peters, Dennis

183

LABORATORY OPTIMIZATION TESTS OF TECHNETIUM DECONTAMINATION OF HANFORD WASTE TREATMENT PLANT LOW ACTIVITY WASTE OFF-GAS CONDENSATE SIMULANT  

SciTech Connect (OSTI)

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Off-Gas Condensate) from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of glass waste. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the potential treatment of this stream to remove radionuclides and subsequently disposition the decontaminated stream elsewhere, such as the Effluent Treatment Facility (ETF), for example. The treatment process envisioned is very similar to that used for the Actinide Removal Process (ARP) that has been operating for years at the Savannah River Site (SRS), and focuses on using mature radionuclide removal technologies that are also compatible with longterm tank storage and immobilization methods. For this new application, testing is needed to demonstrate acceptable treatment sorbents and precipitating agents and measure decontamination factors for additional radionuclides in this unique waste stream. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet and will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. One of the radionuclides that is volatile and expected to be in greatest abundance in this LAW Off-Gas Condensate stream is Technetium-99 ({sup 99}Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are low but are also expected to be in measurable concentration in the LAW Off-Gas Condensate are {sup 129}I, {sup 90}Sr, {sup 137}Cs, {sup 241}Pu, and {sup 241}Am. These are present due to their partial volatility and some entrainment in the off-gas system. This report discusses results of optimized {sup 99}Tc decontamination testing of the simulant. Testing examined use of inorganic reducing agents for {sup 99}Tc. Testing focused on minimizing the quantity of sorbents/reactants added, and minimizing mixing time to reach the decontamination targets in this simulant formulation. Stannous chloride and ferrous sulfate were tested as reducing agents to determine the minimum needed to convert soluble pertechnetate to the insoluble technetium dioxide. The reducing agents were tried with and without sorbents.

Taylor-Pashow, K.; Nash, C.; McCabe, D.

2014-09-29T23:59:59.000Z

184

Hydrogen Threshold Cost Calculation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

185

Hydrogen Pathway Cost Distributions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

186

Cost-Benefit Analysis  

Science Journals Connector (OSTI)

Acost-benefit analysis is an analytical procedure for determining the economic efficiency of intervention, expressed as the relationship between costs and outcomes, usually measured in monetary terms. In othe...

2008-01-01T23:59:59.000Z

187

Cost-Efficiency  

Science Journals Connector (OSTI)

Cost?efficiency is agoal that has been integrated by policy makers into all modern health care systems to control the expansion of costs over time. It relates to maximizing the quality of acomparable unit ...

2008-01-01T23:59:59.000Z

188

About Cost Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from the university, fee-for-service contracts, as well as establishing CAMD as a cost center. We know that our users are reluctant to see CAMD become a cost center, however...

189

Costs of Electricity  

Science Journals Connector (OSTI)

A major reason for the decreased interest in the building of new nuclear power plants in recent years has been the relatively high cost of nuclear power. In this section, we will consider the role of costs in electricity

2005-01-01T23:59:59.000Z

190

Direct/Indirect Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

1997-03-28T23:59:59.000Z

191

Cost Optimal Energy Performance  

Science Journals Connector (OSTI)

EPBD recast requires Member States (MS) to ensure that minimum energy performance requirements of buildings are set with a view to achieving cost optimal levels using a comparative methodology framework...1]. Cost

Jarek Kurnitski

2013-01-01T23:59:59.000Z

192

Development And Initial Testing Of Off-Gas Recycle Liquid From The WTP Low Activity Waste Vitrification Process - 14333  

SciTech Connect (OSTI)

The Waste Treatment and Immobilization Plant (WTP) process flow was designed to pre-treat feed from the Hanford tank farms, separate it into a High Level Waste (HLW) and Low Activity Waste (LAW) fraction and vitrify each fraction in separate facilities. Vitrification of the waste generates an aqueous condensate stream from the off-gas processes. This stream originates from two off-gas treatment unit operations, the Submerged Bed Scrubber (SBS) and the Wet Electrospray Precipitator (WESP). Currently, the baseline plan for disposition of the stream from the LAW melter is to recycle it to the Pretreatment facility where it gets evaporated and processed into the LAW melter again. If the Pretreatment facility is not available, the baseline disposition pathway is not viable. Additionally, some components in the stream are volatile at melter temperatures, thereby accumulating to high concentrations in the scrubbed stream. It would be highly beneficial to divert this stream to an alternate disposition path to alleviate the close-coupled operation of the LAW vitrification and Pretreatment facilities, and to improve long-term throughput and efficiency of the WTP system. In order to determine an alternate disposition path for the LAW SBS/WESP Recycle stream, a range of options are being studied. A simulant of the LAW Off-Gas Condensate was developed, based on the projected composition of this stream, and comparison with pilot-scale testing. The primary radionuclide that vaporizes and accumulates in the stream is Tc-99, but small amounts of several other radionuclides are also projected to be present in this stream. The processes being investigated for managing this stream includes evaporation and radionuclide removal via precipitation and adsorption. During evaporation, it is of interest to investigate the formation of insoluble solids to avoid scaling and plugging of equipment. Key parameters for radionuclide removal include identifying effective precipitation or ion adsorption chemicals, solid-liquid separation methods, and achievable decontamination factors. Results of the radionuclide removal testing indicate that the radionuclides, including Tc-99, can be removed with inorganic sorbents and precipitating agents. Evaporation test results indicate that the simulant can be evaporated to fairly high concentration prior to formation of appreciable solids, but corrosion has not yet been examined.

McCabe, Daniel J.; Wilmarth, William R.; Nash, Charles A.; Taylor-Pashow, Kathryn M.; Adamson, Duane J.; Crawford, Charles L.; Morse, Megan M.

2014-01-07T23:59:59.000Z

193

Optimizing procurement and handling costs in a utility  

E-Print Network [OSTI]

We propose a novel method to quantify the cost of activities involved in the picking portion of order fulfillment. We adapt the general method of picking cost quantification to the specific situation of TP&G, a publicly ...

Genser, Bradley Philip

2014-01-01T23:59:59.000Z

194

Cost Containment and Productivity  

E-Print Network [OSTI]

Cost Containment and Productivity Faculty Assembly Presentation January 22, 2013 Arthur G. Ramicone, CFO David N. DeJong, Vice Provost, Academic Planning and Resources Management #12;Cost Containment Resources to Enhance the Student Experience · Reduce the Cost and Complexity of Administrative Operations

Jiang, Huiqiang

195

Power Plant Cycling Costs  

SciTech Connect (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

196

Lunch & Learn Cost Sharing  

E-Print Network [OSTI]

Lunch & Learn Cost Sharing #12;Today's Agenda Policy Procedures OMNI Child Budget Setup Transactions in OMNI FACET Common Issues #12;Cost Sharing Policy http://www.research.fsu.edu/contractsgra nts ­ Not quantified ­ Do not have to account for and report #12;Cost Sharing Procedures http

McQuade, D. Tyler

197

Activities  

Broader source: Energy.gov [DOE]

Activities and events provide Residential Network members the opportunity to discuss similar needs and challenges, and to collectively identify effective strategies and useful resources.

198

Summary of activities of the life cycle costing workshop conducted by the Environmental Restoration Program of Oak Ridge National Laboratory. Enviromental Restoration Program  

SciTech Connect (OSTI)

A five-day life cycle workshop was conducted by the Environmental Restoration (FR) Program of Oak Ridge National Laboratory (ORNL) to develop appropriate remediation scenarios for each Waste Area Grouping (WAG) at ORNL and to identify associated data needs (e.g., remedial investigations, special studies, and technology demonstrations) and required interfaces. Workshop participants represented the Department of Energy, Martin Marietta Energy Systems, Inc., Bechtel National, Radian Corporation, EBASCO Corporation, and M-K Ferguson. The workshop was used to establish a technical basis for remediation activities at each WAG. The workshop results are documented in this report and provide the baseline for estimating the technical scope for each WAG. The scope and associated budgets and schedules will be summarized in baseline reports for each WAG, which, in turn, will be compiled into an overall strategy document for ORNL ER.

Not Available

1992-08-01T23:59:59.000Z

199

Cost Function Estimates  

Science Journals Connector (OSTI)

Abstract The cost function describes the cost-minimizing combinations of inputs required for production of different levels of output. Empirical cost function studies take both short-run and long-run approaches and can be structurally consistent with microeconomic theory versus more behavioral or real-world data oriented. Studies of health care providers face numerous challenges including the multiproduct nature of the firm, difficulty in controlling for quality of service, and frequent failure of the profit-maximization assumption. Cost function applications in health care are numerous and include such topics as optimal firm size, performance inefficiency measures, and comparisons of production costs with third-party payments.

K. Carey

2014-01-01T23:59:59.000Z

200

Cost effective lighting  

SciTech Connect (OSTI)

Long-life replacement lamps for the incandescent lamp have been evaluated with regard to their cost effectiveness. The replacements include the use of energy buttons that extend lamp life as well as an adaptive fluorescent circline lamp that will fit into existing incandescent lamp sockets. The initial, operating, and replacement costs for one million lumen-hours are determined for each lamp system. We find the most important lighting cost component is the operating cost. Using lamps that are less efficient or devices that cause lamps to operate less efficiently are not cost-effective. The adaptive fluorescent circline lamp, even at an initial cost of $15.00, is the most cost effective source of illumination compared to the incandescent lamp and lamp systems examined. 3 refs., 6 tabs.

Morse, O.; Verderber, R.

1987-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Cost Model for Digital Curation: Cost of Digital Migration  

E-Print Network [OSTI]

Steece, B. 2000. Software cost estimation with COCOMO II.Developing a Framework of Cost Elements for PreservingAshley, K. 1999. Digital archive costs: Facts and fallacies.

Kejser, Ulla Bgvad; Nielsen, Anders Bo; Thirifays, Alex

2009-01-01T23:59:59.000Z

202

Cost Utility of Prostate Cancer Chemoprevention with Dutasteride in Men with an Elevated Prostate Specific Antigen  

Science Journals Connector (OSTI)

...Articles Impact of Screening Test Performance and Cost on Mortality Reduction and Cost-effectiveness of Multimodal Ovarian Cancer Screening...mortality reduction, years of life saved, and cost-effectiveness achievable by annual multimodal...

Robert S. Svatek and Yair Lotan

2011-02-01T23:59:59.000Z

203

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Analytical Services & Testing Contract June 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

204

Sandia National Laboratories: reduce the cost of solar power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the cost of solar power Launch of Solar Testing Site in Vermont On November 27, 2013, in Energy, Facilities, News, News & Events, Partnership, Photovoltaic, Photovoltaic Regional...

205

Commercial equipment cost database  

SciTech Connect (OSTI)

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

206

The Resonating Arm Exerciser: design and pilot testing of a mechanically passive rehabilitation device that mimics robotic active assistance  

E-Print Network [OSTI]

M: Electromechanical and robot-assisted arm training forthat provides robot-like assistance for active arm trainingRobots allow a variety of forms of active Page 2 of 12 assistance to be provided for arm

Zondervan, Daniel K; Palafox, Lorena; Hernandez, Jorge; Reinkensmeyer, David J

2013-01-01T23:59:59.000Z

207

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

208

Laboratory Scoping Tests Of Decontamination Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant  

SciTech Connect (OSTI)

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Off-Gas Condensate) from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of glass waste. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task seeks to examine the potential treatment of this stream to remove radionuclides and subsequently disposition the decontaminated stream elsewhere, such as the Effluent Treatment Facility (ETF), for example. The treatment process envisioned is very similar to that used for the Actinide Removal Process (ARP) that has been operating for years at the Savannah River Site (SRS), and focuses on using mature radionuclide removal technologies that are also compatible with longterm tank storage and immobilization methods. For this new application, testing is needed to demonstrate acceptable treatment sorbents and precipitating agents and measure decontamination factors for additional radionuclides in this unique waste stream. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet and will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. One of the radionuclides that is volatile and expected to be in high concentration in this LAW Off-Gas Condensate stream is Technetium-99 ({sup 99}Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are also expected to be in appreciable concentration in the LAW Off-Gas Condensate are {sup 129}I, {sup 90}Sr, {sup 137}Cs, and {sup 241}Am. This report discusses results of preliminary radionuclide decontamination testing of the simulant. Testing examined use of Monosodium Titanate (MST) to remove {sup 90}Sr and actinides, inorganic reducing agents for {sup 99}Tc, and zeolites for {sup 137}Cs. Test results indicate that excellent removal of {sup 99}Tc was achieved using Sn(II)Cl{sub 2} as a reductant, coupled with sorption onto hydroxyapatite, even in the presence of air and at room temperature. This process was very effective at neutral pH, with a Decontamination Factor (DF) >577 in two hours. It was less effective at alkaline pH. Conversely, removal of the cesium was more effective at alka

Taylor-Pashow, Kathryn M.; Nash, Charles A.; Crawford, Charles L.; McCabe, Daniel J.; Wilmarth, William R.

2014-01-21T23:59:59.000Z

209

LMFBR fuel component costs  

SciTech Connect (OSTI)

A significant portion of the cost of fabricating LMFBR fuels is in the non-fuel components such as fuel pin cladding, fuel assembly ducts and end fittings. The contribution of these to fuel fabrication costs, based on FFTF experience and extrapolated to large LMFBR fuel loadings, is discussed. The extrapolation considers the expected effects of LMFBR development programs in progress on non-fuel component costs.

Epperson, E.M.; Borisch, R.R.; Rice, L.H.

1981-10-29T23:59:59.000Z

210

Cost analysis guidelines  

SciTech Connect (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

211

Petroleum well costs.  

E-Print Network [OSTI]

??This is the first academic study of well costs and drilling times for Australia??s petroleum producing basins, both onshore and offshore. I analyse a substantial (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

212

Early Station Costs Questionnaire  

Broader source: Energy.gov (indexed) [DOE]

of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the...

213

''When Cost Measures Contradict''  

SciTech Connect (OSTI)

When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes empirically these two properties of different costs measures as they pertain to assessing the costs of the carbon abatement policies, especially the Kyoto Protocol, under alternative assumptions about implementation.

Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P. M.

2003-05-09T23:59:59.000Z

214

Low Cost, Durable Seal  

Broader source: Energy.gov [DOE]

This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects.

215

Functional thinking in cost estimation through the tools and concepts of axiomatic design  

E-Print Network [OSTI]

There has been an increasing demand for cost estimation tools which aid in the reduction of system cost or the active consideration of cost as a design constraint. The existing tools are currently incapable of anticipating ...

Odhner, Lael Ulam, 1980-

2004-01-01T23:59:59.000Z

216

The energy costs of sexual dimorphism in mole-rats are morphological not behavioural  

Science Journals Connector (OSTI)

...January 2006 research-article The energy costs of sexual dimorphism in mole-rats...mammals have directly compared the energy costs of reproductive activities between...sexes for either species. The energy cost of dimorphism is most likely to...

2006-01-01T23:59:59.000Z

217

Rain increases the energy cost of bat flight  

Science Journals Connector (OSTI)

...properly cited. Rain increases the energy cost of bat flight Christian C. Voigt...moistening of their body inflicts energy costs on flight by reducing lift and...test the idea that rain imposes energy costs on flying bats. We quantified...

2011-01-01T23:59:59.000Z

218

Rocky Flats Closure Unit Cost Data  

SciTech Connect (OSTI)

The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

Sanford, P.C. [1129 Business Parkway South, Westminister, MD (United States); Skokan, B. [United States Department of Energy, Washington, DC (United States)

2007-07-01T23:59:59.000Z

219

Cost Estimating and Cost Management Capacity Building Workshop  

E-Print Network [OSTI]

Cost Estimating and Cost Management Capacity Building Workshop August 11-13, 2010 Coffman Memorial 574 guidebook on cost estimating and cost management · To learn how states are moving forward with the implementation of the guidebook or other initiatives related to cost estimating and cost management · To share

Minnesota, University of

220

Colorado stride (COSTRIDE): testing genetic and physiological moderators of response to an intervention to increase physical activity  

E-Print Network [OSTI]

details University of Colorado Boulder, Boulder, CO 80309,data and rationale for Colorado STRIDE. J Behav Med 2013,as: Bryan et al. : Colorado stride (COSTRIDE): testing

Bryan, Angela D; Magnan, Renee E; Hooper, Ann E; Ciccolo, Joseph T; Marcus, Bess; Hutchison, Kent E

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Simple Modular LED Cost Model  

Broader source: Energy.gov [DOE]

The LED Cost Model, developed by the DOE Cost Modeling Working Group, provides a simplified method for analyzing the manufacturing costs of an LED package. The model focuses on the major cost...

222

Costing climate change  

Science Journals Connector (OSTI)

...Costenergy analyses of such schemes...and tidal power at costs...consider in economic analyses of GHG abatement...pertaining to wind power in Denmark...In a cost analysis of implementing...Cutting coal combustion...large an economic burden...

2002-01-01T23:59:59.000Z

224

Breaking the Fuel Cell Cost Barrier AMFC Workshop  

E-Print Network [OSTI]

tech materials BOM-based cost barriers ­ 90% of stack cost Cost volatility - Platinum $500/Oz - $2 * present CCM has 265 cm2 active area Work initiated on scalable AMFC stack design & development Lab status #12;Processes in PEM and AEM Membrane Fuel Cells Anode: H2 +2OH- = 2H2O +2e Cathode: 2e + 0.5O2

225

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

226

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

existing avoided cost methodology and established thefor certain avoided cost methodologies or avoided cost inpu

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

227

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

228

Low Cost Hydrogen Production Platform  

SciTech Connect (OSTI)

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

Timothy M. Aaron, Jerome T. Jankowiak

2009-10-16T23:59:59.000Z

229

Reduce generating costs and eliminate brownouts  

SciTech Connect (OSTI)

Improving the manoeuverability of a coal-fired plant to allow it to participate in primary frequency support will reduce generation cost and minimize brownouts. The challenge is to do so without compromising efficiency or emissions. This article describes an approach - activation of stored energy - that is cost-effective and applicable to both greenfield and brownfield installations. It requires a new control philosophy, plus the correct application of new level and flow measurement 'best practices'. 4 refs., 1 tab.

Nogaja, R.; Menezes, M. [Emerson Process Management (United States)

2007-06-15T23:59:59.000Z

230

Lookin g for data personnel costs, indirect costs, equipment costs  

Broader source: Energy.gov (indexed) [DOE]

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

231

NETL: Mercury Emissions Control Technologies - Low-Cost Options for  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Low-Cost Options for Moderate Levels of Mercury Control Low-Cost Options for Moderate Levels of Mercury Control ADA- Environmental Solutions will test two new technologies for mercury control. The TOXECON II(tm) technology injects activated carbon directly into the downstream collecting fields of an electrostatic precipitator. The benefit of this technology is that the majority of the fly ash is collected in the upstream collecting fields which results in only a small portion of carbon-contaminated ash. Additionally, the TOXECON II(tm) technology requires minimal capital investment as only minor retrofits to the electrostatic precipitator are needed. The second technology is injection of novel sorbents for mercury removal on units with hot-side electrostatic precipitators (ESPs). Mercury removal from hot-side electrostatic precipitators is difficult as their high operating temperature range keeps the mercury in the vapor phase and prevents the mercury from adsorbing onto sorbents. The TOXECON II(tm) technology will be tested at Entergy's Independence Station which burns PRB coal. The novel sorbents for hot-side ESPs technology will be tested at MidAmerican's Council Bluffs Energy Center and MidAmerican's Louisa Station, both of which burn PRB coal. Additional project partners include EPRI, MidAmerican, Entergy, Alliant, ATCO Power, DTE Energy, Oglethorpe Power, Norit Americas Inc., Xcel Energy, Southern Company, Arch Coal, and EPCOR.

232

Cost effectiveness of recycling: A systems model  

SciTech Connect (OSTI)

Highlights: Curbside collection of recyclables reduces overall system costs over a range of conditions. When avoided costs for recyclables are large, even high collection costs are supported. When avoided costs for recyclables are not great, there are reduced opportunities for savings. For common waste compositions, maximizing curbside recyclables collection always saves money. - Abstract: Financial analytical models of waste management systems have often found that recycling costs exceed direct benefits, and in order to economically justify recycling activities, externalities such as household expenses or environmental impacts must be invoked. Certain more empirically based studies have also found that recycling is more expensive than disposal. Other work, both through models and surveys, have found differently. Here we present an empirical systems model, largely drawn from a suburban Long Island municipality. The model accounts for changes in distribution of effort as recycling tonnages displace disposal tonnages, and the seven different cases examined all show that curbside collection programs that manage up to between 31% and 37% of the waste stream should result in overall system savings. These savings accrue partially because of assumed cost differences in tip fees for recyclables and disposed wastes, and also because recycling can result in a more efficient, cost-effective collection program. These results imply that increases in recycling are justifiable due to cost-savings alone, not on more difficult to measure factors that may not impact program budgets.

Tonjes, David J., E-mail: david.tonjes@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States); Waste Reduction and Management Institute, School of Marine and Atmospheric Sciences, Stony Brook University, Stony Brook, NY 11794-5000 (United States); Center for Bioenergy Research and Development, Advanced Energy Research and Technology Center, Stony Brook University, 1000 Innovation Rd., Stony Brook, NY 11794-6044 (United States); Mallikarjun, Sreekanth, E-mail: sreekanth.mallikarjun@stonybrook.edu [Department of Technology and Society, College of Engineering and Applied Sciences, Stony Brook University, Stony Brook, NY 11794-3560 (United States)

2013-11-15T23:59:59.000Z

233

activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Detecting Things We Cannot See: Learning the Concepts of Control and Detecting Things We Cannot See: Learning the Concepts of Control and Variable in an Experiment Submitted by Anita Brook-Dupree, 1996 TRAC teacher at Fermilab, Teacher, Alternative Middle Years School, Philadelphia, PA. Particle physicists at Fermilab in Batavia, Illinois are faced with the problem of detecting the presence of sub-atomic particles they cannot see. During my summer as a TRAC teacher at Fermilab, I tried to think of ways to teach middle school students about things we cannot see. I want to thank my nine-year-old daughter Gia for the idea for the following activity. I was lamenting that I could not come up with ideas of how to relate the work of Fermilab scientists to anything that my students would understand. Then I was reminded by my daughter, that when I brought her to school on the

234

Quantitative structureactivity relationships for toxicity and genotoxicity of halogenated aliphatic compounds: Wing spot test of Drosophila melanogaster  

Science Journals Connector (OSTI)

Halogenated aliphatic compounds were evaluated for toxic and genotoxic effects in the somatic mutation and recombination test employing Drosophila melanogaster. The tested chemicals included chlorinated, brominated and iodinated; mono-, di- and tri-substituted; saturated and unsaturated alkanes: 1,2-dibromoethane, 1-bromo-2-chloroethane, 1-iodopropane, 2,3-dichloropropene, 3-bromo-1-propene, epibromohydrin, 2-iodobutane, 3-chloro-2-methylpropene, 1,2,3-trichloropropane, 1,2-dichloroethane, 1,2-dichlorobutane, 1-chloro-2-methylpropane, 1,3-dichloropropane, 1,2-dichloropropane, 2-chloroethymethylether, 1-bromo-2-methylpropane and 1-chloropentane. N-methyl-N-nitrosourea served as the positive and distilled water as the negative control. The set of chemicals for the toxicological testing was selected by the use of statistical experiment design. Group of unsaturated aliphatic hydrocarbons were generally more toxic than saturated analogues. The genotoxic effect was observed with 14 compounds in the wing spot test, while 3 substances did not show any genotoxicity by using the wing spot test at 50% lethal concentration. The highest number of wing spots was observed in genotoxicity assay with 1-bromo-2-chloroethane, 1,2-dichloroethane, 1,2-dibromoethane and 1-iodopropane. Nucleophilic superdelocalizability calculated by quantum mechanics appears to be a good parameter for prediction of both toxicity and genotoxicity effects of halogenated aliphatic compounds.

Karel Chroust; Martina Pavlov; Zbyn?k Prokop; Jan Mendel; Kate?ina Bokov; Zden?k Kubt; Veronika Zaj??kov; Ji?? Damborsk

2007-01-01T23:59:59.000Z

235

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

236

Estimating Renewable Energy Costs  

Broader source: Energy.gov [DOE]

Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

237

Cost Effective Sustainable Housing.  

E-Print Network [OSTI]

??Cost Effective Sustainable Housing The topic of research which was discussed throughout this study was an analysis of sustainable development between single-family and multi-family structures. (more)

Morton, Joshua

2009-01-01T23:59:59.000Z

238

Cost Estimating Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

2011-05-09T23:59:59.000Z

239

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and Renewable Energy Get Widget Code...

240

Costing climate change  

Science Journals Connector (OSTI)

...even whether man-made greenhouse-gas emissions should...and monetary savings from lighting policy calculated using `Work Energy Smart Lighting Calculator', assuming...reducing energy costs and greenhouse gases. Australian Greenhouse...

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Estimating environmental costs  

Science Journals Connector (OSTI)

Added demands on natural resources and proposed environmental regulations could potentially have a significant impact on the production and operational costs of information technology (IT). In this paper, we utilize an Economic Input-Output Life-Cycle ...

Kiara Corrigan; Amip Shah; Chandrakant Patel

2010-02-01T23:59:59.000Z

242

Standard costs for labor  

E-Print Network [OSTI]

STANDARD COSTS FOR LABOR A Thesis By MD. NURUL ABSAR KHAN Submitted to the Graduate School of the Agricultural and Mechanical College of Texms in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION... Administration and the government of East Pakistan. CONTENTS Chapter Page I. Introduction and Prelisd. nary Discussion II. Installation and Accounting Aspects of Standard Costs for Labor III, Recording~ Analysing and Reporting of Labor Vaxlances . 45 IV...

Khan, Mohammed Nurul Absar

2012-06-07T23:59:59.000Z

243

FIRE Vacuum Vessel Cost estimate and R&D needs  

E-Print Network [OSTI]

primary shell and port cost est. Includes: Torus shell · Internal shielding · Active coils · Passive for: - Octant - Midplane port - Aux port - Vertical port - Active coil segment - IB passive plate Does not include: · Internal hdwe supports cost category hours $k hours $k In-house design 24680 2468 7380 738 R

244

Tokamak reactor cost model based on STARFIRE/WILDCAT costing  

SciTech Connect (OSTI)

A cost model is presented which is useful for survey and comparative studies of tokamak reactors. The model is heavily based on STARFIRE and WILDCAT costing guidelines, philosophies, and procedures and reproduces the costing for these devices quite accurately.

Evans, K. Jr.

1983-03-01T23:59:59.000Z

245

Solutions to Test 1  

E-Print Network [OSTI]

Test 1. September 26, 2013. 1. Zach buys a billiards table for his apartment. The cost of the table is 4000 and he uses a loan to pay for the table. The loan will be...

jeffb_000

2014-02-16T23:59:59.000Z

246

Bacterial and enzymatic bioassays for toxicity testing in the environment  

SciTech Connect (OSTI)

Microbioassays using bacteria or enzymes are increasingly applied to measure chemical toxicity in the environment. Attractive features of these assays may include low cost, rapid response to toxicants, high sample throughput, modest laboratory equipment and space requirements, low sample volume, portability, and reproducible responses. Enzymatic tests rely on measurement of either enzyme activity or enzyme biosynthesis. Dehydrogenases are the enzymes most used in toxicity testing. Assay of dehydrogenase activity is conveniently carried out using oxidoreduction dyes such as tetrazolium salts. Other enzyme activity tests utilize ATPases, esterases, phosphatases, urease, luciferase, beta-galactosidase, protease, amylase, or beta-glucosidase. Recently, the inhibition of enzyme (beta-galactosidase, tryptophanase, alpha-glucosidase) biosynthesis has been explored as a basis for toxicity testing. Enzyme biosynthesis was found to be generally more sensitive to organic chemicals than enzyme activity.107 references.

Bitton, G.; Koopman, B. (Department of Environmental Engineering Sciences, University of Florida, Gainesville (United States))

1992-01-01T23:59:59.000Z

247

Knoxville Area Transit: Propane Hybrid ElectricTrolleys; Advanced Technology Vehicles in Service, Advanced Vehicle Testing Activity (Fact Sheet)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

website and in print publications. website and in print publications. TESTING ADVANCED VEHICLES KNOXVILLE AREA TRANSIT ◆ PROPANE HYBRID ELECTRIC TROLLEYS Knoxville Area Transit PROPANE HYBRID ELECTRIC TROLLEYS NREL/PIX 13795 KNOXVILLE AREA TRANSIT (KAT) is recognized nationally for its exceptional service to the City of Knoxville, Tennessee. KAT received the American Public Transportation Associa- tion's prestigious Outstanding Achievement Award in 2004.

248

Key Activities | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Key Activities Key Activities Key Activities The Water Power Program conducts work in four key areas at the forefront of water power research. The Program is structured to help the United States meet its growing energy demands sustainably and cost-effectively by developing innovative renewable water power technologies, breaking down market barriers to deployment, building the infrastructure to test new technologies, and assessing water power resources for integration into our nation's grid. Research and Development Introduce and advance new marine and hydrokinetic technologies to provide sustainable and cost-effective renewable energy from the nation's waves, tides, currents, and ocean thermal gradients. Research and develop innovative hydropower technologies to sustainably tap our country's diverse water resources including rivers,

249

Cost analysis of oil, gas, and geothermal well drilling  

Science Journals Connector (OSTI)

Abstract This paper evaluates current and historical drilling and completion costs of oil and gas wells and compares them with geothermal wells costs. As a starting point, we developed a new cost index for US onshore oil and gas wells based primarily on the API Joint Association Survey 19762009 data. This index describes year-to-year variations in drilling costs and allows one to express historical drilling expenditures in current year dollars. To distinguish from other cost indices we have labeled it the Cornell Energy Institute (CEI) Index. This index has nine sub-indices for different well depth intervals and has been corrected for yearly changes in drilling activity. The CEI index shows 70% higher increase in well cost between 2003 and 2008 compared to the commonly used Producer Price Index (PPI) for drilling oil and gas wells. Cost trends for various depths were found to be significantly different and explained in terms of variations of oil and gas prices, costs, and availability of major well components and services at particular locations. Multiple methods were evaluated to infer the cost-depth correlation for geothermal wells in current year dollars. In addition to analyzing reported costs of the most recently completed geothermal wells, we investigated the results of the predictive geothermal well cost model WellCost Lite. Moreover, a cost database of 146 historical geothermal wells has been assembled. The CEI index was initially used to normalize costs of these wells to current year dollars. A comparison of normalized costs of historical wells with recently drilled ones and WellCost Lite predictions shows that cost escalation rates of geothermal wells were considerably lower compared to hydrocarbon wells and that a cost index based on hydrocarbon wells is not applicable to geothermal well drilling. Besides evaluating the average well costs, this work examined economic improvements resulting from increased drilling experience. Learning curve effects related to drilling multiple similar wells within the same field were correlated.

Maciej Z. Lukawski; Brian J. Anderson; Chad Augustine; Louis E. Capuano Jr.; Koenraad F. Beckers; Bill Livesay; Jefferson W. Tester

2014-01-01T23:59:59.000Z

250

COST TRANSFER INSTRUCTIONS If you are using the electronic version of the Cost Transfer form, you must ensure that each form has a new CTXXXXXXXX number. When you  

E-Print Network [OSTI]

COST TRANSFER INSTRUCTIONS If you are using the electronic version of the Cost Transfer form, you and send it in with the same number. A Cost Transfer is an adjustment made sometime after an event has occurred which transfers costs from University projects or activities where the charges had been originally

251

Building Energy Software Tools Directory: Room Air Conditioner Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Room Air Conditioner Cost Estimator Room Air Conditioner Cost Estimator Screen capture of Room Air Conditioner Cost Estimator The cost estimator compares high-efficiency room air conditioners to standard equipment in terms of life cycle cost. It provides an alternative to complicated building simulation models, while offering more precision than simplified estimating tools that are commonly available. The cost estimator assists decision-making regarding the purchase or replacement of room air conditioning equipment, by estimating a product�s lifetime energy cost savings at various efficiency levels. Screen Shots Keywords air conditioner, life-cycle cost, energy performance, residential buildings, energy savings Validation/Testing Internal reviews at Pacific Northwest National Laboratory.

252

Low-Cost "Vacuum Desiccator"  

Science Journals Connector (OSTI)

Low-Cost "Vacuum Desiccator" ... Described are individualized, low-cost, and safe desiccators that can be efficiently and rapidly made with an inexpensive kitchen aid sold for shrink-wrapping food. ... Cost-Effective Teacher ...

Frederick Sweet

2004-10-01T23:59:59.000Z

253

Factors Impacting Decommissioning Costs - 13576  

SciTech Connect (OSTI)

The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

Kim, Karen; McGrath, Richard [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)] [Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

2013-07-01T23:59:59.000Z

254

Roadway Improvement Project Cost Allocation  

E-Print Network [OSTI]

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

255

Sunk Costs and Competitive Bidding  

E-Print Network [OSTI]

SUNK COSTS AND COMPETITIVE BIDDING Kenneth R. FrenchRevised: November 1982 SUNK COSTS AND COMPETITIVE BIDDINGl the winning bid be? I f sunk costs do not matter, I f the

French, Kenneth R.; McCormick, Robert E.

1982-01-01T23:59:59.000Z

256

Recovery Efficiency Test Project: Phase 1, Activity report. Volume 1: Site selection, drill plan preparation, drilling, logging, and coring operations  

SciTech Connect (OSTI)

The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

1987-04-01T23:59:59.000Z

257

Assigning research and development costs  

E-Print Network [OSTI]

and Development Cost Components RESEARCH AND DEVELOPMENT COSTS IN FINANCIAL STATEMENTS . 10 Capitalization Basis for Reporting Research and Development Costs Revenue Basis for Reporting Research and Development Costs Reasons Why Most Companies Expense... PRACTICE WITH ACCOUNTING THEORY Unknown Results at the End of an Accounting Period Uncertain Useful Life of Results. . . . . . . . . . . . . Recurrence of Annual Costs Permissive Feature of the Internal Revenue Code Uniform Amounts of Annual Costs...

Edwards, Wendell Edward

2012-06-07T23:59:59.000Z

258

Evidence of cost growth under cost-plus and fixed-price contracting  

SciTech Connect (OSTI)

As defined by the US Department of Energy (DOE), privatization refers to a shifting of responsibilities for the completion of projects from a cost-plus Management and Operations (M and O) contract, to incentive-based contracts with the private sector. DOE`s new vision is to arrange cleanup work around incentives-based contracts, which are won via competitive bidding. Competition in awarding cleanup contracts can make use of market incentives to lower project costs and reduce slippage time. Fixed-price contracts encourage contractors to minimize schedule delays and cost overruns once the scope of a project has been negotiated. Conversely, cost-plus contracting offers weak incentives for contractors to select cost-minimizing production and management approaches. Because privatization explicitly allocates more risk to the contractor, it forces the government to better define its goals and methods. This study summarizes actual cost experiences with government contracts performed under cost-plus and fixed-price incentive structures at all levels of government. The first section provides some background on the problem of making contractor activity more cost-efficient. Following this are sections on the measurement of performance and the costs of projects, limitations on measurement, and findings of similar studies. The study concludes with appendices discussing the details of the performance measurement methodology and the project data sets used in the study.

Scott, M.J.; Paananaen, O.H.; Redgate, T.E.; Ulibarri, C.A.; Jaksch, J.A.

1998-09-01T23:59:59.000Z

259

Low Cost, High Performance, 50-year Electrode  

Broader source: Energy.gov (indexed) [DOE]

this ARPA-E project, Primus Power will develop an this ARPA-E project, Primus Power will develop an extremely durable, highly active, conductive, and inexpensive electrode for flow batteries. Flow batteries offer one of the most exciting opportunities for affordable grid storage, however electrodes are costly and are the single largest cost component in a well integrated design. Grid storage can yield numerous benefits in utility and customer- owned applications:  renewable firming  peak load reduction  load shifting  capital deferral  frequency regulation By incorporating volume production practices from the chlorine, filter media, and electroplating industries, Primus Power will effectively reduce electrode costs to exceed GRIDS cost targets while providing the durability essential for widespread grid-scale adoption.

260

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

INDEPENDENT COST REVIEW (ICR)  

Broader source: Energy.gov (indexed) [DOE]

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

262

Power Plant Cycling Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

263

Cost Controls Pay Off Big  

Science Journals Connector (OSTI)

Cost Controls Pay Off Big ... Biggest plus was the general improvement in the economy; but to this must be added successful efforts by industry to control costs. ...

1959-02-16T23:59:59.000Z

264

QGESS: Capital Cost Scaling Methodology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(costs and values of inputs, outputs, and processes, including capital and operating costs) and performance (mass conversion, energy efficiency, and, generally speaking,...

265

HARD X-RAY LAGS IN ACTIVE GALACTIC NUCLEI: TESTING THE DISTANT REVERBERATION HYPOTHESIS WITH NGC 6814  

SciTech Connect (OSTI)

We present an X-ray spectral and temporal analysis of the variable active galaxy NGC 6814, observed with Suzaku during 2011 November. Remarkably, the X-ray spectrum shows no evidence for the soft excess commonly observed amongst other active galaxies, despite its relatively low level of obscuration, and is dominated across the whole Suzaku bandpass by the intrinsic powerlaw-like continuum. Despite this, we clearly detect the presence of a low-frequency hard lag of ?1600 s between the 0.5-2.0 and 2.0-5.0 keV energy bands at greater than 6? significance, similar to those reported in the literature for a variety of other active galactic nuclei (AGNs). At these energies, any additional emission from, e.g., a very weak, undetected soft excess, or from distant reflection must contribute less than 3% of the observed countrates (at 90% confidence). Given the lack of any significant continuum emission component other than the powerlaw, we can rule out models that invoke distant reprocessing for the observed lag behavior, which must instead be associated with this continuum emission. These results are fully consistent with a propagating fluctuation origin for the low-frequency hard lags, and with the interpretation of the high-frequency soft lagsa common feature seen in the highest quality AGN data with strong soft excessesas reverberation from the inner accretion disk.

Walton, D. J.; Harrison, F. A. [Cahill Centre for Astronomy and Astrophysics, California Institute of Technology, Pasadena, CA 91125 (United States)] [Cahill Centre for Astronomy and Astrophysics, California Institute of Technology, Pasadena, CA 91125 (United States); Zoghbi, A.; Reynolds, C. S. [Department of Astronomy, University of Maryland, College Park, MD 20742 (United States)] [Department of Astronomy, University of Maryland, College Park, MD 20742 (United States); Cackett, E. M. [Department of Physics and Astronomy, Wayne State University, Detroit, MI 48201 (United States)] [Department of Physics and Astronomy, Wayne State University, Detroit, MI 48201 (United States); Uttley, P. [Astronomical Institute Anton Pannekoek, University of Amsterdam, Postbus 94249, NL-1090 GE Amsterdam (Netherlands)] [Astronomical Institute Anton Pannekoek, University of Amsterdam, Postbus 94249, NL-1090 GE Amsterdam (Netherlands); Fabian, A. C.; Kara, E. [Institute of Astronomy, University of Cambridge, Madingley Road, Cambridge, CB3 0HA (United Kingdom)] [Institute of Astronomy, University of Cambridge, Madingley Road, Cambridge, CB3 0HA (United Kingdom); Miller, J. M.; Reis, R. C. [Department of Astronomy, University of Michigan, 500 Church Street, Ann Arbor, MI 48109 (United States)] [Department of Astronomy, University of Michigan, 500 Church Street, Ann Arbor, MI 48109 (United States)

2013-11-10T23:59:59.000Z

266

Activity testing of alveolar macrophages and changes in surfactant phospholipids after irradiation in bronchoalveolar lavage: Experimental and clinical data  

SciTech Connect (OSTI)

This study presents results of bronchoalveolar lavage (BAL) after irradiation to the lungs in mice as well as clinical data. The number of BAL cells, mainly macrophages, lymphocytes, and granulocytes, changed in a time-dependent manner. The phagocytic activity of the macrophages measured as the phagocytosis of microbeads and measured as the esterase activity also showed a strong time-dependent increase during the acute phase up to 21 days after irradiation. The contents of surfactant phospholipids (SF) and sphingomyelin (SPH; as a parameter for cell death) were quantified by HPLC. Both were significantly changed between day 2 and 21 after irradiation. Three BALs of a patient with idiopathic interstitial pneumonitis, who had received an allogenic bone marrow graft after total body irradiation with 10 Gy, showed similar effects in the cellular and surfactant parameters. These data indicate that there are positive interactions between the number of different BAL cells, macrophage activity, and SF and SPH content in the preclinical model of the mouse as well as in the clinical situation after lung irradiation. 30 refs., 7 figs., 3 tabs.

Steinberg, F.; Rehn, B.; Kraus, R.; Quabeck, K.; Bruch, J.; Beelen, D.W.; Schaefer, U.W.; Streffer, C. (Univ. Clinics, Essen (Germany))

1992-07-01T23:59:59.000Z

267

Low Cost, Durable Seal  

SciTech Connect (OSTI)

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

268

Cost Type Examples Salary costs for staff working  

E-Print Network [OSTI]

Cost Type Examples Salary costs for staff working on the grant Fellows, research assistants by the technician can be supported by a verifiable audit trail. Specialist consultancy fees Recruitment costs Staff recruitment and advertising costs, including interviewee travel. Materials & consumables Laboratory chemicals

Rambaut, Andrew

269

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network [OSTI]

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National fiber reinforced composites have enjoyed limited acceptance in the automotive industry due to high costs to bond with composite matrix material. It is important that a carbon fiber manufacturing cost model

270

Estimating SCR installation costs  

SciTech Connect (OSTI)

The EUCG surveyed 72 separate US installations of selective catalytic reduction (SCR) systems at coal-fired units totalling 41 GW of capacity to identify the systems' major cost drivers. The results, summarized in this article, provide excellent first-order estimates and guidance for utilities considering installing the downstream emissions-control technology. 4 figs., 1 tab.

Marano, M.; Sharp, G. [American Electric Power (United States)

2006-01-15T23:59:59.000Z

271

Reclamation cost inputs for the resource allocation and mine costing model. Final working paper  

SciTech Connect (OSTI)

The purpose of this study is to improve estimates of surface mining reclamation cost components used as inputs to the Energy Information Administration's Resource Allocation and Mine Costing (RAMC) model. Costs ignored by the RAMC equations and input separately into the model on a regional basis were the focus of this study. Estimates of costs associated with the following reclamation activities were developed: valley fill construction, topsoil handling, runoff and diversion ditch construction and backfilling, sediment pond construction and backfilling, final pit backfilling and highwall reduction, revegetation, and permitting. For each activity, separate estimates were developed by cost component (initial capital, deferred capital, and annual operating), region (central Appalachia, northern Appalachia, the Midwest, and the West), and overburden ratio. For the first five activities, a ''composite mine'' approach was used. Basic engineering data on the quantity of material moved, and the distance over which it is moved, were obtained on a task-by-task basis for regional samples of actual mining operations. Mine permit applications filed with state and federal regulatory agencies were used as the source of these data. On the basis of the collected data, average material quantities and transportation distances were calculated for each region and reclamation task; these averages were used as the composite mine specifications assumed to be representative of the typical earthmoving requirements associated with each task in each region. Revegetation costs were estimated on the basis of published or publicly available data representing either the actual or estimated costs to state governments of revegetating abandoned mine sites. Permitting costs were developed on the basis of estimates of typical regional permitting costs solicited from engineering contractors providing permitting services to the coal industry. 11 tabs.

Not Available

1984-11-30T23:59:59.000Z

272

Cost-Effectiveness: Implication for Bonneville and Utility Programs Council document 2007-23 August 2007  

E-Print Network [OSTI]

1 Cost-Effectiveness: Implication for Bonneville and Utility Programs Council document 2007 found to be cost effective if the electric system paid all the costs. Council plan conservation targets are based on availability of conservation that passes this Total Resource Cost (TRC) test. Since its first

273

Invoice Statement of Cost Cost Type/Cost Share UT-B Contracts Div Page 1 of 1  

E-Print Network [OSTI]

Invoice Statement of Cost ­ Cost Type/Cost Share UT-B Contracts Div Aug 2009 Page 1 of 1 invoice-state-cost-ext-venx-aug09 Company Name: Statement of Amounts Claimed Invoice Number: Statement of Cost ­ Cost Type/Cost Cost Subcontractor Cost Job Title Name Current Hours Rate Current Amount Cumulative Hours Cumulative

Pennycook, Steve

274

High-Activity Dealloyed Catalysts 2010 DOE Hydrogen Program Fuel Cell  

E-Print Network [OSTI]

High-Activity Dealloyed Catalysts 2010 DOE Hydrogen Program Fuel Cell Project Kick-active-area fuel cells, to be made available for DOE testing Reduce catalyst cost while achieving the required · Subcontractors: ­ Technical University of Berlin ­ Johnson Matthey Fuel Cells ­ Massachusetts Institute

275

Robust Cost Colorings Takuro Fukunaga  

E-Print Network [OSTI]

Robust Cost Colorings Takuro Fukunaga Magn´us M. Halld´orsson Hiroshi Nagamochi Abstract We consider graph coloring problems where the cost of a coloring is the sum of the costs of the colors, and the cost of a color is a monotone concave function of the total weight of the class. This models resource

Halldórsson, Magnús M.

276

Cost Estimates for New Molecules  

Science Journals Connector (OSTI)

Cost Estimates for New Molecules ... Once this has been carried out, the projected cost/kilogram for the new drug substance (if only raw material costs and no manufacturing/overhead/labour costs are considered) may well come down by a factor of 10 or even 100, and this is often more acceptable to management trying to make strategic decisions about potential profitability. ...

Trevor Laird

2005-02-22T23:59:59.000Z

277

Cost Sharing Why and How  

E-Print Network [OSTI]

Cost Sharing Why and How Trudy M. Riley Assistant Provost, Research Administration Susan M. Tkachick Sponsored Research Accountant $ Research Office #12;Research Office AGENDA What is Cost Sharing Why Cost Share What is Allowable Managing Cost Sharing during the life of the project What happens

Firestone, Jeremy

278

7 - Cost-Efficiency Evaluation  

Science Journals Connector (OSTI)

The purpose of cost-efficiency evaluations is to make the connection between cost and outcomes. Using methods like cost-benefit analysis and cost-effective analysis, this allows evaluators to provide the most complete information. The information may be used to make better decisions about implementation or continuing a program.

Gennaro F. Vito; George E. Higgins

2015-01-01T23:59:59.000Z

279

Cost Estimating, Analysis, and Standardization  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

1984-11-02T23:59:59.000Z

280

Cost Study Manual | Department of Energy  

Energy Savers [EERE]

Cost Study Manual Cost Study Manual Update 62912. Memo regarding Cost Study Manual Cost Study Manual More Documents & Publications Policy Flash 2013-62 Acquisition Letter 09 -...

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

costs | OpenEI  

Open Energy Info (EERE)

7 7 Varnish cache server costs Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (11 months ago) Date Updated March 04th, 2013 (11 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

282

Decommissioning Cost Estimating Factors And Earned Value Integration  

SciTech Connect (OSTI)

The Rocky Flats 771 Project progressed from the planning stage of decommissioning a plutonium facility, through the strip-out of highly-contaminated equipment, removal of utilities and structural decontamination, and building demolition. Actual cost data was collected from the strip-out activities and compared to original estimates, allowing the development of cost by equipment groupings and types and over time. Separate data was developed from the project control earned value reporting and compared with the equipment data. The paper discusses the analysis to develop the detailed factors for the different equipment types, and the items that need to be considered during characterization of a similar facility when preparing an estimate. The factors are presented based on direct labor requirements by equipment type. The paper also includes actual support costs, and examples of fixed or one-time start-up costs. The integration of the estimate and the earned value system used for the 771 Project is also discussed. The paper covers the development of the earned value system as well as its application to a facility to be decommissioned and an existing work breakdown structure. Lessons learned are provided, including integration with scheduling and craft supervision, measurement approaches, and verification of scope completion. In summary: The work of decommissioning the Rocky Flats 771 Project process equipment was completed in 2003. Early in the planning process, we had difficulty in identifying credible data and implementing processes for estimating and controlling this work. As the project progressed, we were able to collect actual data on the costs of removing plutonium contaminated equipment from various areas over the life of this work and associate those costs with individual pieces of equipment. We also were able to develop and test out a system for measuring the earned value of a decommissioning project based on an evolving estimate. These were elements that would have been useful to us in our early planning process, and we would expect that they would find application elsewhere as the DOE weapons complex and some commercial nuclear facilities move towards closure. (authors)

Sanford, P.C.; Cimmarron, E. [Englewood, CO, B. Skokan, Office of Project Management Oversight, EM-53, United States Department of Energy, Washington, DC (United States)

2008-07-01T23:59:59.000Z

283

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for  

Broader source: Energy.gov (indexed) [DOE]

Buildings Buildings Estimate Costs to Implement Greenhouse Gas Mitigation Strategies for Buildings October 7, 2013 - 11:09am Addthis YOU ARE HERE Step 4 When estimating the cost of implementing the greenhouse gas (GHG) mitigation strategies, Federal agencies should consider the life-cycle costs and savings of the efforts. The major cost elements associated with developing and implementing a project are identified in Table 1. Table 1. Major Costs for Project Development and Implementation Cost Element Description Variables Project planning costs Preparatory work by building owners and design team. Benchmarking activities. Building audits. Developing statements of work for subcontractors. Selecting contractors. Integrated design process (for major renovations). Type of project; previous team experience; local markets; number of stakeholders

284

Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0  

SciTech Connect (OSTI)

This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D&D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities.

Olson, A.L.; Nacht, S.J.

1997-11-01T23:59:59.000Z

285

Development of a low-cost underwater manipulator  

E-Print Network [OSTI]

This thesis describes the design, modeling, manufacture, and testing of a low cost, multiple degree-of-freedom underwater manipulator. Current underwater robotic arm technologies are often expensive or limited in functionality. ...

Cooney, Lauren Alise

2006-01-01T23:59:59.000Z

286

Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances |  

Broader source: Energy.gov (indexed) [DOE]

Technology Partnerships Are Yielding Reliable, Cost-Saving Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances November 9, 2011 - 12:01pm Addthis Oak Ridge National Laboratory's facility tests several water heaters at one time. Because of ORNL's accelerated durability testing, they estimate that 10 months of constant operation in its testing facility is comparable to 10 years of service life in a typical residential setting. | Photo courtesy of the Building Technologies Research and Integration Center, ORNL Oak Ridge National Laboratory's facility tests several water heaters at one time. Because of ORNL's accelerated durability testing, they estimate that 10 months of constant operation in its testing facility is comparable to 10

287

Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances |  

Broader source: Energy.gov (indexed) [DOE]

Partnerships Are Yielding Reliable, Cost-Saving Partnerships Are Yielding Reliable, Cost-Saving Appliances Technology Partnerships Are Yielding Reliable, Cost-Saving Appliances November 9, 2011 - 12:01pm Addthis Oak Ridge National Laboratory's facility tests several water heaters at one time. Because of ORNL's accelerated durability testing, they estimate that 10 months of constant operation in its testing facility is comparable to 10 years of service life in a typical residential setting. | Photo courtesy of the Building Technologies Research and Integration Center, ORNL Oak Ridge National Laboratory's facility tests several water heaters at one time. Because of ORNL's accelerated durability testing, they estimate that 10 months of constant operation in its testing facility is comparable to 10 years of service life in a typical residential setting. | Photo courtesy of

288

Plan for decommissioning the Tokamak Fusion Test Reactor  

SciTech Connect (OSTI)

The Tokamak Fusion Test Reactor (TFTR) Project is in the planning phase of developing a decommissioning project. A Preliminary Decontamination and Decommissioning (D D) Plan has been developed which provides a framework for the baseline approach, and the cost and schedule estimates. TFTR will become activated and contaminated with tritium after completion of the deuterium-tritium (D-T) experiments. Hence some of the D D operations will require remote handling. It is expected that all of the waste generated will be low level radioactive waste (LLW). The objective of the D D Project is to make TFTR Test Cell available for use by a new fusion experiment. This paper discusses the D D objectives, the facility to be decommissioned, estimates of activation, the technical (baseline) approach, and the assumptions used to develop cost and schedule estimates.

Spampinato, P.T.; Walton, G.R. (Princeton Univ., NJ (United States). Plasma Physics Lab.); Commander, J.C. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

1993-01-01T23:59:59.000Z

289

Plan for decommissioning the Tokamak Fusion Test Reactor  

SciTech Connect (OSTI)

The Tokamak Fusion Test Reactor (TFTR) Project is in the planning phase of developing a decommissioning project. A Preliminary Decontamination and Decommissioning (D&D) Plan has been developed which provides a framework for the baseline approach, and the cost and schedule estimates. TFTR will become activated and contaminated with tritium after completion of the deuterium-tritium (D-T) experiments. Hence some of the D&D operations will require remote handling. It is expected that all of the waste generated will be low level radioactive waste (LLW). The objective of the D&D Project is to make TFTR Test Cell available for use by a new fusion experiment. This paper discusses the D&D objectives, the facility to be decommissioned, estimates of activation, the technical (baseline) approach, and the assumptions used to develop cost and schedule estimates.

Spampinato, P.T.; Walton, G.R. [Princeton Univ., NJ (United States). Plasma Physics Lab.; Commander, J.C. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

1993-12-31T23:59:59.000Z

290

Low Cost Radio Telescope  

Science Journals Connector (OSTI)

A radio interferometer has been constructed at Haverford College as an aid to learning the fundamentals of radio astronomy. Its cost both in cash outlay and in construction time make it a feasible year-long project for an undergraduate. Its simplicity does not prevent it from being a useful instrument for instruction at the college or high-school level; among its capabilities are the measurement of the positions of at least four of the strongest discrete cosmic-noisesources and the diameter of the radio sun.

Joseph H. Taylor Jr.

1964-01-01T23:59:59.000Z

291

Laboratory and Field Testing of Commercially Available Detectors for the Identification of Chemicals of Interest in the Nuclear Fuel Cycle for the Detection of Undeclared Activities  

SciTech Connect (OSTI)

Traditionally, IAEA inspectors have focused on the detection of nuclear indicators as part of infield inspection activities. The ability to rapidly detect and identify chemical as well as nuclear signatures can increase the ability of IAEA inspectors to detect undeclared activities at a site. Identification of chemical indicators have been limited to use in the analysis of environmental samples. Although IAEA analytical laboratories are highly effective, environmental sample processing does not allow for immediate or real-time results to an IAEA inspector at a facility. During a complementary access inspection, under the Additional Protocol, the use of fieldable technologies that can quickly provide accurate information on chemicals that may be indicative of undeclared activities can increase the ability of IAEA to effectively and efficiently complete their mission. The Complementary Access Working Group (CAWG) is a multi-laboratory team with members from Brookhaven National Laboratory, Idaho National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratory. The team identified chemicals at each stage of the nuclear fuel cycle that may provide IAEA inspectors with indications that proliferation activities may be occurring. The group eliminated all indicators related to equipment, technology and training, developing a list of by-products/effluents, non-nuclear materials, nuclear materials, and other observables. These proliferation indicators were prioritized based on detectability from a conduct of operations (CONOPS) perspective of a CA inspection (for example, whether an inspector actually can access the S&O or whether it is in process with no physical access), and the IAEAs interest in the detection technology in conjunction with radiation detectors. The list was consolidated to general categories (nuclear materials from a chemical detection technique, inorganic chemicals, organic chemicals, halogens, and miscellaneous materials). The team then identified commercial off the shelf (COTS) chemical detectors that may detect the chemicals of interest. Three chemical detectors were selected and tested both in laboratory settings and in field operations settings at Idaho National Laboratory. The instruments selected are: Thermo Scientific TruDefender FT (FTIR), Thermo Scientific FirstDefender RM (Raman), and Bruker Tracer III SD (XRF). Functional specifications, operability, and chemical detectability, selectivity, and limits of detection were determined. Results from the laboratory and field tests will be presented. This work is supported by the Next Generation Safeguards Initiative, Office of Nonproliferation and International Security, National Nuclear Security Administration.

Carla Miller; Mary Adamic; Stacey Barker; Barry Siskind; Joe Brady; Warren Stern; Heidi Smartt; Mike McDaniel; Mike Stern; Rollin Lakis

2014-07-01T23:59:59.000Z

292

Wind Integration Cost and Cost-Causation: Preprint  

SciTech Connect (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

293

Reducing LED Costs Through Innovation  

Broader source: Energy.gov [DOE]

A Wisconsin-based company is developing an innovative way to reduce manufacturing costs of light-emitting diodes (LEDs).

294

Financial Costs of Meeting Global Biodiversity Conservation Targets: Current Spending and Unmet Needs  

Science Journals Connector (OSTI)

...in agricultural regions of Minnesota . Wildl. Soc. Bull. 26...For helpful comments and assistance we thank A. Bruner, R...supplementary materials. Financial Costs of Meeting Global...current: 'active'});}); Financial costs of meeting global biodiversity...

Donal P. McCarthy; Paul F. Donald; Jrn P. W. Scharlemann; Graeme M. Buchanan; Andrew Balmford; Jonathan M. H. Green; Leon A. Bennun; Neil D. Burgess; Lincoln D. C. Fishpool; Stephen T. Garnett; David L. Leonard; Richard F. Maloney; Paul Morling; H. Martin Schaefer; Andy Symes; David A. Wiedenfeld; Stuart H. M. Butchart

2012-11-16T23:59:59.000Z

295

Advanced Vehicle Testing Activity (AVTA)- Vehicle Testing and Demonstration Activities  

Broader source: Energy.gov [DOE]

2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

296

Cost Effectiveness NW Energy Coalition  

E-Print Network [OSTI]

1 Action 8 Cost Effectiveness Manual Kim Drury NW Energy Coalition Context · Inconsistent understanding of cost effectiveness contributed to under performing conservation E.g: individual measures vs at end of 2009 #12;2 The thinking was . . . That a Cost Effectiveness Guide could: · Increase regionally

297

The cost of a bodyguard  

Science Journals Connector (OSTI)

...research-article Animal behaviour 1001 60 70 14 The cost of a bodyguard Fanny Maure 1 2 * Jacques...benefits of host manipulation and their costs to fitness-related traits, such as longevity...study provides the first evidence of a cost required for manipulating host behaviour...

2011-01-01T23:59:59.000Z

298

Check Estimates and Independent Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

1997-03-28T23:59:59.000Z

299

ROC curves in cost space  

Science Journals Connector (OSTI)

ROC curves and cost curves are two popular ways of visualising classifier performance, finding appropriate thresholds according to the operating condition, and deriving useful aggregated measures such as the area under the ROC curve (AUC) or ... Keywords: Area Under the ROC Curve (AUC), Cost curves, Cost-sensitive evaluation, Kendall tau distance, Operating condition, ROC curves, Ranking performance

Jos Hernndez-Orallo; Peter Flach; Csar Ferri

2013-10-01T23:59:59.000Z

300

Historical pipeline construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for the pipeline construction cost, by analysing individual pipeline cost components with historical pipeline cost data. Cost data of 412 pipelines recorded between 1992 and 2008 in the Oil and Gas Journal are collected and adjusted to 2008 dollars with the chemical engineering plant cost index (CEPCI). The distribution and share of these 412 pipeline cost components are assessed based on pipeline diameter, pipeline length, pipeline capacity, the year of completion, locations of pipelines. The share of material and labour cost dominates the pipeline construction cost, which is about 71% of the total cost. In addition, the learning curve analysis is conducted to attain learning rate with respect to pipeline material and labour costs for different groups. Results show that learning rate and construction cost are varied by pipeline diameters, pipeline lengths, locations of pipelines and other factors. This study also investigates the causes of pipeline construction cost differences among different groups. [Received: October 13, 2010; Accepted: December 20, 2010

Zhenhua Rui; Paul A. Metz; Doug B. Reynolds; Gang Chen; Xiyu Zhou

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

RERTR program activities related to the development and application of new LEU fuels. [Reduced Enrichment Research and Test Reactor; low-enriched uranium  

SciTech Connect (OSTI)

The statue of the U.S. Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief outline of RERTR Program objectives and goals, program accomplishments are discussed with emphasis on the development, demonstration and application of new LEU fuels. Most program activities have proceeded as planned, and a combination of two silicide fuels (U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al) holds excellent promise for achieving the long-term program goals. Current plans and schedules project the uranium density of qualified RERTR fuels for plate-type reactors to grow by approximately 1 g U/cm/sup 3/ each year, from the current 1.7 g U/cm/sup 3/ to the 7.0 g U/cm/sup 3/ which will be reached in late 1988. The technical needs of research and test reactors for HEU exports are also forecasted to undergo a gradual but dramatic decline in the coming years.

Travelli, A.

1983-01-01T23:59:59.000Z

302

A NEW TEST METRIC AND A NEW SCAN ARCHITECTURE FOR EFFICIENT VLSI TESTING  

E-Print Network [OSTI]

A NEW TEST METRIC AND A NEW SCAN ARCHITECTURE FOR EFFICIENT VLSI TESTING A DISSERTATION SUBMITTED. To overcome the difficulty and cost of VLSI testing, we need to search for better testing techniques. Chip testing can be classified into two categories: production testing and characterization testing

Stanford University

303

COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement that is not bourn by  

E-Print Network [OSTI]

1 COST SHARING Cost sharing is the portion of total project costs of a sponsored agreement. There are primarily three types of cost sharing that may occur on sponsored projects: Mandatory cost sharing. For example, the National Science Foundation requires mandatory cost sharing for some of its projects. COST

Cui, Yan

304

Calculator program optimizes bit weight, rotary speed, reducing drilling cost  

SciTech Connect (OSTI)

Bit selection, bit weight, and rotary speed have repeatedly proven to be the most important and commonly overlooked alterable factors which control penetration rate, footage, and overall drilling cost. This is particularly true in offshore operations where drilling costs are highest and the greatest cost savings stand to be achieved through implementation of proven optimization techniques. The myth that bit weights and rotary speeds cannot be optimized in directional holes has hindered the industry from using this virtually cost-free method for reducing drilling cost. The use of optimized bit weights and rotary speeds in conjunction with minimum cost bit programs based on cost per foot analysis of previous bit runs in the area was implemented on a five-well platform in the Grand Isle Block 20 field, offshore Louisiana. Each of the directional wells was drilled substantially faster and cheaper than the discovery well, which was a straight hole. Average reductions in footage cost of 31.3%, based on daily operating cost of $30,000/day, and increase in average daily footage drilled of 45.2% were effected by ''collectively optimizing'' drilling performance. The ''Optimizer'' program is an HP-41CV adaptation of the Bourgoyne and Young drilling model. It was used to calculate the optimum bit weights and rotary speeds based on field drilling tests; historical bit and bearing wear data; and current operating conditions, cost, and constraints.

Simpson, M.A.

1984-04-23T23:59:59.000Z

305

17.2 - Cost Participation  

Broader source: Energy.gov (indexed) [DOE]

17.2 (June 2004) 17.2 (June 2004) 1 Cost Participation [Reference: FAR 35.003(b), DEAR 917.70] Overview This section discusses DOE treatment of cost participation by organizations performing research, development, and demonstration projects under DOE prime contracts. This section does not cover efforts and projects performed for DOE by other Federal agencies. Background Cost participation is a generic term denoting any situation where the Government does not fully reimburse the contractor for all allowable costs necessary to accomplish the project or effort under the contract. The term includes, but is not limited to: * Cost Sharing * Cost Matching * Cost Limitation, which may be direct or indirect * Participation in-kind

306

Realistic costs of carbon capture  

SciTech Connect (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

307

Heliostat cost-analysis tool  

SciTech Connect (OSTI)

Estimated production costs of solar energy systems serve as guides for future component development and as measures of the potential economic viability of the technologies. The analysis of heliostat costs is particularly important since the heliostat field is the largest cost component of a solar central receiver plant. A heliostat cost analysis tool (HELCAT) that processes manufacturing, transportation, and installation cost data has been developed to provide a consistent structure for cost analyses. HELCAT calculates a representative product price based on direct input data (e.g. direct materials, direct labor, capital requirements) and various economic, financial, and accounting assumptions. The characteristics of this tool and its initial application in the evaluation of second generation heliostat cost estimates are discussed. A set of nominal economic and financial parameters is also suggested.

Brandt, L.D.; Chang, R.E.

1981-10-01T23:59:59.000Z

308

Sandia National Laboratories: Photovoltaic Regional Testing Center...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Photovoltaic Regional Test Center (RTC). The RTC will enable research on integrating solar panels into the statewide smart grid and help reduce the cost of solar power. The...

309

Balancing cost and effectiveness in arms control monitoring  

SciTech Connect (OSTI)

This paper provides a qualitative assessment of arms control cost and effectiveness issues. Various chapters characterize some basic requirements for effective verification, summarize the monitoring activities incorporated into the INF, START, CFE, and CWC verification regimes, identify the costs of these monitoring activities as estimated in earlier IDA work, and discuss some reasons for the wide differences in costs among treaties. Drawing on both experience and observation about monitoring costs and effectiveness, the paper indicates where cost-saving modifications can be made to existing agreements and suggests some general principles for structuring monitoring regimes to maintain effectiveness while keeping costs at a minimum. These principles include: requiring the declaration of all facilities that are part of the infrastructure surrounding treaty-limited items and activities during the course of their operational lifetime; validating data at all declared facilities and, subsequently, inspecting those facilities on a quota basis; continuous monitoring of all elimination activities; and incorporating provisions for inspection of undeclared facilities. The paper argues that one frequently-included type of inspection, monitoring of production facilities, is unnecessary and, given the high cost involved, undesirable.

Grotte, J.H.; Klare, J.L.

1992-09-01T23:59:59.000Z

310

DOE to Fund up to $50 Million to Demonstrate Innovative, Cost...  

Energy Savers [EERE]

Steven Chu today announced the Department's intent to fund up to 50 million to test and demonstrate innovative technologies that will lead to cost-competitive solar energy...

311

LIFE CYCLE COST HANDBOOK Guidance for Life Cycle Cost Estimation...  

Office of Environmental Management (EM)

of the parts of a cost estimate (those elements not truly independent of each other in terms of their accuracy and expected values), consider evaluating certain elements as...

312

Property:ExplorationCostPerMetric | Open Energy Information  

Open Energy Info (EERE)

ExplorationCostPerMetric ExplorationCostPerMetric Jump to: navigation, search Property Name ExplorationCostPerMetric Property Type String Description the unit ratio denominator for exploration cost Allows Values 100 feet cut;30 foot core;compound;day;element;foot;hour;mile;point;process;sample;sq. mile;station;Subject;well Subproperties This property has the following 107 subproperties: A Active Seismic Methods Active Seismic Techniques Active Sensors Analytical Modeling B Borehole Seismic Techniques C Cation Geothermometers Chemical Logging Conceptual Model Core Holes Cross-Dipole Acoustic Log D DC Resistivity Survey (Dipole-Dipole Array) DC Resistivity Survey (Mise-Á-La-Masse) DC Resistivity Survey (Pole-Dipole Array) DC Resistivity Survey (Schlumberger Array) DC Resistivity Survey (Wenner Array)

313

Year Average Transportation Cost of Coal  

Gasoline and Diesel Fuel Update (EIA)

delivered costs of coal, by year and primary transport mode Year Average Transportation Cost of Coal (Dollars per Ton) Average Delivered Cost of Coal (Dollars per Ton)...

314

Project Cost Profile Spreadsheet | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template (Combined...

315

EGov PMA Scorecard Cost, Schedule & Performance Standard...  

Energy Savers [EERE]

EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule &...

316

Hydrogen Threshold Cost Calculation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Threshold Cost Calculation Hydrogen Threshold Cost Calculation DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and...

317

High Energy Cost Grants | Department of Energy  

Energy Savers [EERE]

High Energy Cost Grants High Energy Cost Grants The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and...

318

An Examination of Avoided Costs in Utah  

E-Print Network [OSTI]

Subject An Examination of Avoided Costs in Utah Date Januarystate by seeking changes to the avoided cost tariff paid tomethod of calculating avoided costs that has been officially

Bolinger, Mark; Wiser, Ryan

2005-01-01T23:59:59.000Z

319

Flow Test At Chena Area (Benoit, Et Al., 2007) | Open Energy Information  

Open Energy Info (EERE)

Chena Area (Benoit, Et Al., 2007) Chena Area (Benoit, Et Al., 2007) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Chena Area (Benoit, Et Al., 2007) Exploration Activity Details Location Chena Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References Dick Benoit, Gwen Holdmann, David Blackwell (2007) Low Cost Exploration, Testing, And Development Of The Chena Geothermal Resource Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Chena_Area_(Benoit,_Et_Al.,_2007)&oldid=387083" Category: Exploration Activities What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services OpenEI partners with a broad range of international organizations to grow

320

Low-Cost Hydrogen Distributed Production System Development  

SciTech Connect (OSTI)

H{sub 2}Gen, with the support of the Department of Energy, successfully designed, built and field-tested two steam methane reformers with 578 kg/day capacity, which has now become a standard commercial product serving customers in the specialty metals and PV manufacturing businesses. We demonstrated that this reformer/PSA system, when combined with compression, storage and dispensing (CSD) equipment could produce hydrogen that is already cost-competitive with gasoline per mile driven in a conventional (non-hybrid) vehicle. We further showed that mass producing this 578 kg/day system in quantities of just 100 units would reduce hydrogen cost per mile approximately 13% below the cost of untaxed gasoline per mile used in a hybrid electric vehicle. If mass produced in quantities of 500 units, hydrogen cost per mile in a FCEV would be 20% below the cost of untaxed gasoline in an HEV in the 2015-2020 time period using EIA fuel cost projections for natural gas and untaxed gasoline, and 45% below the cost of untaxed gasoline in a conventional car. This 20% to 45% reduction in fuel cost per mile would accrue even though hydrogen from this 578 kg/day system would cost approximately $4.14/kg, well above the DOE hydrogen cost targets of $2.50/kg by 2010 and $2.00/kg by 2015. We also estimated the cost of a larger, 1,500 kg/day SMR/PSA fueling system based on engineering cost scaling factors derived from the two H{sub 2}Gen products, a commercial 115 kg/day system and the 578 kg/day system developed under this DOE contract. This proposed system could support 200 to 250 cars per day, similar to a medium gasoline station. We estimate that the cost per mile from this larger 1,500 kg/day hydrogen fueling system would be 26% to 40% below the cost per mile of untaxed gasoline in an HEV and ICV respectively, even without any mass production cost reductions. In quantities of 500 units, we are projecting per mile cost reductions between 45% (vs. HEVs) and 62% (vs ICVs), with hydrogen costing approximately $2.87/kg, still above the DOE's 2010 $2.50/kg target. We also began laboratory testing of reforming ethanol, which we showed is currently the least expensive approach to making renewable hydrogen. Extended testing of neat ethanol in micro-reactors was successful, and we also were able to reform E-85 acquired from a local fueling station for 2,700 hours, although some modifications were required to handle the 15% gasoline present in E-85. We began initial tests of a catalyst-coated wall reformer tube that showed some promise in reducing the propensity to coke with E-85. These coated-wall tests ran for 350 hours. Additional resources would be required to commercialize an ethanol reformer operating on E-85, but there is no market for such a product at this time, so this ethanol reformer project was moth-balled pending future government or industry support. The two main objectives of this project were: (1) to design, build and test a steam methane reformer and pressure swing adsorption system that, if scaled up and mass produced, could potentially meet the DOE 2015 cost and efficiency targets for on-site distributed hydrogen generation, and (2) to demonstrate the efficacy of a low-cost renewable hydrogen generation system based on reforming ethanol to hydrogen at the fueling station.

C.E. (Sandy) Thomas, Ph.D., President; Principal Investigator, and

2011-03-10T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Download Data | Transparent Cost Database  

Open Energy Info (EERE)

in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a...

322

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost... LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

323

Reviewing electricity generation cost assessments.  

E-Print Network [OSTI]

?? Studies assessing the electricity generation cost of various power generating technologies are becoming increasingly common and references to such studies can often be heard (more)

Larsson, Simon

2012-01-01T23:59:59.000Z

324

Building Life Cycle Cost Programs  

Broader source: Energy.gov [DOE]

The National Institute of Standards and Technology (NIST) developed the Building Life Cycle Cost (BLCC) Program to provide computational support for the analysis of capital investments in buildings.

325

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

performing fiber. (600-750 KSI) Barriers: Addresses the need for higher performance low cost fiber for hydrogen storage tanks and energy management structures of automobiles....

326

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network [OSTI]

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities...

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

327

Fischer Tropsch synthesis : influence of Mn on the carburization rates and activities of Fe-based catalysts by TPR-EXAFS/XANES and catalyst testing.  

SciTech Connect (OSTI)

Fe-based catalysts containing different amounts of Mn were tested for Fischer-Tropsch synthesis using a stirred tank reactor at 270 C, 1.21 MPa, and H{sub 2}:CO = 0.7. Catalyst activation by carburization with 10% CO/He was followed by Temperature Programmed Reduction/X-ray Absorption Spectroscopy (TPR-EXAFS/XANES) from room temperature to 300 C. {gamma}-Fe{sub 2}O{sub 3} was converted into iron carbides, whereas MnO{sub x} was reduced to oxygen deficient MnO. Mn hindered Fe carburization, such that the carburized catalyst displayed higher Fe{sub 3}O{sub 4} content than the catalyst without Mn. EXAFS fitting indicates that the carburized catalyst contained a mixture of Hgg carbide, Fe{sub 3}O{sub 4}, and Mn oxides. Increasing Mn content led to higher CH{sub 4} and light product selectivities, and lower light olefin selectivities. Higher and stable conversions were obtained with a catalyst containing an almost equimolar Fe/Mn ratio relative to the catalyst without Mn. Selectivity trends are attributed to the higher WGS rates observed on the FeMn catalysts, consistent with the structural differences observed.

Ribeiro, M. C.; Jacobs, G.; Pendyala, R.; Davis, B. H.; Cronauer, D. C.; Kropf, A. J.; Marshall, C. L. (Chemical Sciences and Engineering Division); (Univ. of Kentucky)

2011-03-24T23:59:59.000Z

328

FY 2009 Progress Report for Lightweighting Materials- 7. Low-Cost Carbon Fiber  

Broader source: Energy.gov [DOE]

The primary Lightweight Materials activity goal is to validate a cost-effective weight reduction in total vehicle weight while maintaining safety, performance, and reliability.

329

Costs of Storing and Transporting Hydrogen  

Broader source: Energy.gov [DOE]

An analysis was performed to estimate the costs associated with storing and transporting hydrogen. These costs can be added to a hydrogen production cost to determine the total delivered cost of hydrogen.

330

(Coordinated research on fuel cycle cost)  

SciTech Connect (OSTI)

The Department of Energy (DOE) and the Commission of the European Communities (CEC) have been exploring the possibility of parallel studies on the externals costs of employing fuel cycles to deliver energy services. These studies are of particular importance following the activities of the US National Energy Strategy (NES), where the potential discrepancies between market prices and the social costs of energy services were raised as significant policy concerns. To respond to these concerns, Oak Ridge National Laboratory (ORNL) and Resources for the Future (RFF) have begun a collaborative effort for the DOE to investigate the external costs, or externalities, generated by cradle to grave fuel cycle activities. Upon initiating this project, the CEC expressed an interest to the DOE that Europe should conduct a parallel study and that the two studies should be highly coordinated for consistency in the results. This series of meetings with members of the CEC was undertaken to resolve some issues implied by pursuing parallel, coordinated studies; issues that were previously defined by the August meetings. In addition, it was an opportunity for some members of the US research team and the DOE sponsor to meet with their European counterparts for the study, as well as persons in charge of research areas that ultimately would play a key role in the European study.

Cantor, R.A.; Shelton, R.B.; Krupnick, A.J.

1990-11-05T23:59:59.000Z

331

Use of Cost Estimating Relationships  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

1997-03-28T23:59:59.000Z

332

Electric power substation capital costs  

SciTech Connect (OSTI)

The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

Dagle, J.E.; Brown, D.R.

1997-12-01T23:59:59.000Z

333

The future costs of energy  

Science Journals Connector (OSTI)

...2002 GDP per capita: Argentina...15 000 in GDP per capita, then a...afford higher energy cost? Or, should we demand OPEC countries...15 000 in GDP per capita, then a...afford higher energy cost? Or, should we demand OPEC countries...

Matthew R. Simmons

334

Hay Harvesting Costs $$$$$ in Texas.  

E-Print Network [OSTI]

.............. .. ................. 6 LOOSE HAY STACKING ................................... 7 Tractor-Mounted (Front-End Loader) Hay Stacking Equipment .......... .... ............. 8 Fixed Costs ............................................................ 8 Operating Costs..., there is no economic advantage to At least two tractors are usually needed for baling. Most livestock producers who use custom balers will probably have to buy another tractor. This machine may be used for other operations, but the equivalent of one full...

Long, James T.; Taylor, Wayne D.

1972-01-01T23:59:59.000Z

335

A COST ONTOLOGY FOR ENTERPRISE MODELLING K. D.(Donald) Tham, Mark S. Fox, Michael Gruninger  

E-Print Network [OSTI]

A COST ONTOLOGY FOR ENTERPRISE MODELLING K. D.(Donald) Tham, Mark S. Fox, Michael GruningerS 1A4 Abstract There is an urgent need to formalize Activity-Based Costing (ABC) for purposes success, viz., strategic management accounting. To make this possible, the authors present a core cost

Fox, Mark S.

336

COST AND SCHEDULE FOR DRILLING AND MINING UNDERGROUND TEST FACILITIES  

E-Print Network [OSTI]

Waste Storage in Mined Caverns in Crystalline Rock, LBL-Waste Storage in Mined Caverns in Crystalline Rock, LBL-for additional shaft and cavern support and stabilization.

Lamb, D.W.

2013-01-01T23:59:59.000Z

337

Development, Test and Demonstration of a Cost-Effective, Compact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review 2008 on February 25, 2008 in Bethesda, Maryland. merit08taylor...

338

Development, Test and Demonstration of a Cost-Effective, Compact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

10 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C. ape012taylor2010o...

339

TEST DISORDER CPT TAT COST 81331 4 weeks $525  

E-Print Network [OSTI]

,400 81406 4 weeks $1,000 NDE1 sequencing 81405 4 - 6 weeks $1,000 81404 4 weeks $1,000 OCLN sequencing** MCPH tier 2 Sequencing Panel(ARFGEF2, CASC5, CDK5RAP2, CENPJ, CEP63, CEP135, CEP152, MCPH1, MED17, NDE1 (MECP2,TCF4, SLC9A6 and UBE3A sequencing and deletion/duplication) NDE1 deletion/duplication by array

Ober, Carole

340

Development, Test and Demonstration of a Cost-Effective, Compact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation ape012taylor2011o.pdf More Documents & Publications...

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Cost Principles Policy Responsible Office: Cost Analysis Effective Date: November 1, 2013  

E-Print Network [OSTI]

Cost Principles Policy Responsible Office: Cost Analysis Effective Date: November 1, 2013 Last-21, Cost Principles for Educational Institutions and the Cost Accounting Standards Board (CASB)) identify cost accounting policies that must be followed to receive federal awards. These regulations

Jawitz, James W.

342

Entanglement cost of generalised measurements  

E-Print Network [OSTI]

Bipartite entanglement is one of the fundamental quantifiable resources of quantum information theory. We propose a new application of this resource to the theory of quantum measurements. According to Naimark's theorem any rank 1 generalised measurement (POVM) M may be represented as a von Neumann measurement in an extended (tensor product) space of the system plus ancilla. By considering a suitable average of the entanglements of these measurement directions and minimising over all Naimark extensions, we define a notion of entanglement cost E_min(M) of M. We give a constructive means of characterising all Naimark extensions of a given POVM. We identify various classes of POVMs with zero and non-zero cost and explicitly characterise all POVMs in 2 dimensions having zero cost. We prove a constant upper bound on the entanglement cost of any POVM in any dimension. Hence the asymptotic entanglement cost (i.e. the large n limit of the cost of n applications of M, divided by n) is zero for all POVMs. The trine measurement is defined by three rank 1 elements, with directions symmetrically placed around a great circle on the Bloch sphere. We give an analytic expression for its entanglement cost. Defining a normalised cost of any d-dimensional POVM by E_min(M)/log(d), we show (using a combination of analytic and numerical techniques) that the trine measurement is more costly than any other POVM with d>2, or with d=2 and ancilla dimension 2. This strongly suggests that the trine measurement is the most costly of all POVMs.

Richard Jozsa; Masato Koashi; Noah Linden; Sandu Popescu; Stuart Presnell; Dan Shepherd; Andreas Winter

2003-03-27T23:59:59.000Z

343

Design of SystemonaChip Test Access Architectures using Integer Linear Programming 1  

E-Print Network [OSTI]

integration. An ef­ ficient test access architecture should reduce test cost and time­to­market by minimizing. In order to reduce test cost and shorten short time­to­ market, the testing time for an SOC should) For a given test access architecture, how much test data bandwidth is required to meet specified testing time

Chakrabarty, Krishnendu

344

Cost performance comparisons of equivalent conventional and 100% solar houses  

SciTech Connect (OSTI)

The sixth design of ALL SOLAR HOUSE and the equivalent conventional house had detailed performance and item by item cost checks made. Surprisingly the active solar comes out to lower cost than the passive. A further suprise, the passive comes out as more efficient than the active. The conventional house has slightly more uniform temperature and has comparable cost. All these designs are thermostated to the 20+/sup 0/C (70+/sup 0/F) range. All have the same volumetric efficiency. The line of descent for ALL SOLAR HOUSE is: Experimental Manor, All glass house, Peterson's, Binghamton, Loraine, and now Keene. The last on speculation for the low cost market as a prototype for wide spread use. Several of the specially engineered components have been used that they are offered commercially.

Saunders, N.B.

1980-01-01T23:59:59.000Z

345

Cost-Sensitive Tree of Classifiers Zhixiang (Eddie) Xu XUZX@CSE.WUSTL.EDU  

E-Print Network [OSTI]

on unnecessary computation can lead to monetary savings and reductions of greenhouse gas emissions. The test cascades (Viola & Jones, 2004; Lefakis & Fleuret, 2010; Saberian & Vasconcelos, 2010; Pujara et al., 2011 of this expected cost. This principled approach leads to unmatched test-cost/accuracy tradeoffs as it naturally

Weinberger, Kilian

346

Chapter 6 - Subsea Cost Estimation  

Science Journals Connector (OSTI)

Publisher Summary This chapter provides guidelines for cost estimation during a project feasibility study, where the accuracy range is between 30% for subsea field development projects. Subsea cost refers to the cost of the whole project, which generally includes the capital expenditures (CAPEX) and operation expenditures (OPEX) of the subsea field development. The feasibility studies are performed before execution of the project, which may include three phases as shown in the figure: prefield development; conceptual/feasibility study; and front-end engineering design (FEED). Cost estimations are made for several purposes, and the methods used for the estimations as well as the desired amount of accuracy will be different. The cost estimation classifications according to Association for the Advancement of Cost Engineering (AACE): level of project definition: expressed as percentage of complete definition; end usage: typical purpose of estimation; methodology: typical estimating method; expected accuracy range: typical range relative to best index of 1; and preparation effort: typical degree of effort relative to least cost index of 1.

Yong Bai; Qiang Bai

2010-01-01T23:59:59.000Z

347

Demand response compensation, net Benefits and cost allocation: comments  

SciTech Connect (OSTI)

FERC's Supplemental Notice of Public Rulemaking addresses the question of proper compensation for demand response in organized wholesale electricity markets. Assuming that the Commission would proceed with the proposal ''to require tariff provisions allowing demand response resources to participate in wholesale energy markets by reducing consumption of electricity from expected levels in response to price signals, to pay those demand response resources, in all hours, the market price of energy for such reductions,'' the Commission posed questions about applying a net benefits test and rules for cost allocation. This article summarizes critical points and poses implications for the issues of net benefit tests and cost allocation. (author)

Hogan, William W.

2010-11-15T23:59:59.000Z

348

Memory cost of quantum protocols  

E-Print Network [OSTI]

In this paper we consider the problem of minimizing the ancillary systems required to realize an arbitrary strategy of a quantum protocol, with the assistance of classical memory. For this purpose we introduce the notion of memory cost of a strategy, which measures the resources required in terms of ancillary dimension. We provide a condition for the cost to be equal to a given value, and we use this result to evaluate the cost in some special cases. As an example we show that any covariant protocol for the cloning of a unitary transformation requires at most one ancillary qubit. We also prove that the memory cost has to be determined globally, and cannot be calculated by optimizing the resources independently at each step of the strategy.

Alessandro Bisio; Giacomo Mauro D'Ariano; Paolo Perinotti; Michal Sedlak

2011-12-16T23:59:59.000Z

349

Engineering Evaluation/Cost Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOEPPPO03-0145&D2 Engineering EvaluationCost Analysis for Group 1 Buildings X-103, X-334, and X-344B at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio This document has...

350

Wind Electrolysis: Hydrogen Cost Optimization  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Wind Electrolysis: Hydrogen Cost Optimization Genevieve Saur, Todd Ramsden Prepared under...

351

Rising Cost of Generating Electricity  

Science Journals Connector (OSTI)

... METHODS are being discussed by electrical engineers to meet the rising costs of generating ... of generating electricity. Even before the War this was becoming a serious problem. In some cases it ...

1940-07-20T23:59:59.000Z

352

Cost Effective Water Heating Solutions  

Broader source: Energy.gov [DOE]

This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question"Are high-efficiency hot water heating systems worth the cost?"

353

Lower Cost Carbon Fiber Precursors  

Broader source: Energy.gov (indexed) [DOE]

1 Lower Cost Carbon Fiber Precursors P.I. Name: Dave Warren Presenter: Dr. Amit K. Naskar Oak Ridge National Laboratory 05162012 Project ID LM004 This presentation does not...

354

Cost | OpenEI Community  

Open Energy Info (EERE)

Cost Cost Home Ocop's picture Submitted by Ocop(5) Member 18 April, 2013 - 13:41 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To normalize competing claims of LCOE, DOE has developed-for its own use-a standardized cost and performance data reporting process to facilitate uniform calculation of LCOE from MHK device developers. This standardization framework is only the first version in what is anticipated to be an iterative process that involves industry and the broader DOE stakeholder community. Multiple files are attached here for review and comment.Upload Files: application/vnd.openxmlformats-officedocument.wordprocessingml.document icon device_performance_validation_data_request.docx application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon

355

AVTA: Chevrolet Malibu HEV 2013 Testing Results | Department...  

Broader source: Energy.gov (indexed) [DOE]

Chevrolet Malibu HEV 2013 Testing Results AVTA: Chevrolet Malibu HEV 2013 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on...

356

AVTA: Quantum Escape PHEV Testing Results | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Quantum Escape PHEV Testing Results AVTA: Quantum Escape PHEV Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide...

357

AVTA: Hyundai Sonata HEV 2011 Testing Results | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Hyundai Sonata HEV 2011 Testing Results AVTA: Hyundai Sonata HEV 2011 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a...

358

AVTA: Honda Insight HEV 2010 Testing Results | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Honda Insight HEV 2010 Testing Results AVTA: Honda Insight HEV 2010 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a...

359

Search Costs in Airline Markets  

E-Print Network [OSTI]

SEARCH COSTS IN AIRLINE MARKETS A Dissertation by JOSE ANTONIO PELLERANO GUZMAN Submitted to the Office of Graduate and Professional Studies of Texas A&M University in partial fulfillment of the requirements for the degree... Copyright 2013 Jos Antonio Pellerano Guzmn ii ABSTRACT This paper recovers consumer search cost estimates in airline markets consistent with theoretical search models. We follow an empirical framework developed in the recent literature...

Pellerano Guzman, Jose

2013-12-04T23:59:59.000Z

360

Summary of Construction Activities and Results from Six Initial Accelerated Pavement Tests Conducted on Asphalt Concrete Pavement Section for Modified-Binder Overlay  

E-Print Network [OSTI]

tests in terms of DCP penetration rates in the aggregatewere extracted. Average penetration rates m across section mmix gradations. Penetration Rate, mm/blow count Station, m

Bejarano, Manuel O.; Morton, Bruce S.; Scheffy, Clark

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Treatability study operational testing program and implementation plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Treatability Study (TS) Operational Testing Program and Implementation Plan identifies operational testing to be performed to: (1) Demonstrate the technical feasibility of methods proposed for the removal of radiochemical sludge heels from the underground storage tanks located at Oak Ridge National Laboratory (ORNL), known as the Gunite and Associated Tanks (GAAT) Operable Unit (OU). (The bulk of the radiochemical waste, which was previously stored in the tanks, was removed during the 1980s, and only a sludge heel remains.) (2) Reduce the uncertainty in meeting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the GAAT OU. (3) Minimize the overall costs to accomplish the first two objectives. An initial Feasibility Study (FS) effort identified uncertainties in the evaluation of various alternatives for addressing the remediation of the GAAT OU. To support future decision making, the US. Department of Energy is performing a TS to identify cost-effective remediation approaches for the GAAT OU by providing information to reduce cost and technical uncertainty and better define acceptable remediation strategies. The testing activities will be initially conducted in a nonradioactive environment at the Tanks Technology Cold Test Facility (TTCTF) at ORNL. This will permit the design and initial performance testing and training activities to be completed while minimizing the risk, employee exposure, and costs associated with the testing effort. The component design and functional testing and initial system performance testing will be completed in the TTCTF. After the component and initial system performance testing have been completed, the operations testing will continue in the North Tank Farm (NTF). This testing has an associated higher cost and risk, but is necessary to provide results for actual waste heel removal.

NONE

1996-03-01T23:59:59.000Z

362

Inverter Testing at Sandia National Laboratories* Jerry W. Ginn  

Office of Scientific and Technical Information (OSTI)

Inverter Testing at Sandia National Inverter Testing at Sandia National Laboratories* Jerry W. Ginn Russell H. Bonn Photovoltaic System Components Department Sandia National Laboratories PO Box 5800 Albuquerque, NM 87185-0752 Abstract. Inverters are key building blocks of photovoltaic (PV) systems that produce ac power. The balance of systems @OS) portion of a PV system can account for up to 50% of the system cost, and its reliable operation is essential for a successful PV system. As part of its BOS program, Sandia National Laboratories (SNL) maintains a laboratory wherein accurate electrical measurements of power systems can be made under a variety of conditions. This paper outlines the work that is done in that laboratory. TESTING ACTIVITIES Inverter testing at SNL thus far

363

Letting The Sun Shine On Solar Costs: An Empirical Investigation Of Photovoltaic Cost Trends In California  

E-Print Network [OSTI]

INVESTIGATION OF PHOTOVOLTAIC COST TRENDS IN CALIFORNIA RyanInvestigation of Photovoltaic Cost Trends in California,cost of customer-sited, grid-connected solar photovoltaic (

Wiser, Ryan; Bolinger, Mark; Cappers, Peter; Margolis, Robert

2006-01-01T23:59:59.000Z

364

CAS Indirect Cost Recovery Practices "Facilities and Administration" (F&A) Costs or, "Indirect Cost Recovery (ICR)," are costs incurred by the  

E-Print Network [OSTI]

CAS Indirect Cost Recovery Practices "Facilities and Administration" (F&A) Costs or, "Indirect Cost Recovery (ICR)," are costs incurred by the University for common or joint projects and cannot be specifically attributed to an individual project. Some examples of indirect costs include accounting staff

Vonessen, Nikolaus

365

Sponsored Project Account Cost Transfer Explanation  

E-Print Network [OSTI]

Sponsored Project Account Cost Transfer Explanation Check-Off List December 2011 The explanations checked below best describe the reasons for why the cost transfers are being made. Costs as to how to allocate the cost, temporarily assigned the cost to an existing account that acted

He, Chuan

366

COST ACCOUNTING IN US CITIES: TRANSACTION COSTS AND GOVERNANCE FACTORS AFFECTING COST ACCOUNTING DEVELOPMENT AND USE  

E-Print Network [OSTI]

Cost accounting in government is a topic that has an oddly uncertain place in public financial management. Many people know what it is as an ideal construct but do not know what it is in practice. This uncertainty of ...

Mohr, Zachary Thomas

2013-05-31T23:59:59.000Z

367

NUCLEAR ENERGY SYSTEM COST MODELING  

SciTech Connect (OSTI)

The U.S. Department of Energys Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative Island approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this islands used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an islands cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

Francesco Ganda; Brent Dixon

2012-09-01T23:59:59.000Z

368

Low-Cost Options for Moderate Levels of Mercury Control  

SciTech Connect (OSTI)

This is the final technical report for a three-site project that is part of an overall program funded by the U.S. Department of Energy's National Energy Technology Laboratory (DOE/NETL) and industry partners to obtain the necessary information to assess the feasibility and costs of controlling mercury from coal-fired utility plants. This report summarizes results from tests conducted at MidAmerican's Louisa Generating Station and Entergy's Independence Steam Electric Station (ISES) and sorbent screening at MidAmerican's Council Bluffs Energy Center (CBEC) (subsequently renamed Walter Scott Energy Center (WSEC)). Detailed results for Independence and Louisa are presented in the respective Topical Reports. As no full-scale testing was conducted at CBEC, screening updates were provided in the quarterly updates to DOE. ADA-ES, Inc., with support from DOE/NETL, EPRI, and other industry partners, has conducted evaluations of EPRI's TOXECON II{trademark} process and of high-temperature reagents and sorbents to determine the capabilities of sorbent/reagent injection, including activated carbon, for mercury control on different coals and air emissions control equipment configurations. An overview of each plant configuration is presented: (1) MidAmerican's Louisa Generating Station burns Powder River Basin (PRB) coal in its 700-MW Unit 1 and employs hot-side electrostatic precipitators (ESPs) with flue gas conditioning for particulate control. This part of the testing program evaluated the effect of reagents used in the existing flue gas conditioning on mercury removal. (2) MidAmerican's Council Bluffs Energy Center typically burns PRB coal in its 88-MW Unit 2. It employs a hot-side ESP for particulate control. Solid sorbents were screened for hot-side injection. (3) Entergy's Independence Steam Electric Station typically burns PRB coal in its 880-MW Unit 2. Various sorbent injection tests were conducted on 1/8 to 1/32 of the flue gas stream either within or in front of one of four ESP boxes (SCA = 542 ft{sup 2}/kacfm), specifically ESP B. Initial mercury control evaluations indicated that although significant mercury control could be achieved by using the TOXECON II{trademark} design, the sorbent concentration required was higher than expected, possibly due to poor sorbent distribution. Subsequently, the original injection grid design was modeled and the results revealed that the sorbent distribution pattern was determined by the grid design, fluctuations in flue gas flow rates, and the structure of the ESP box. To improve sorbent distribution, the injection grid and delivery system were redesigned and the effectiveness of the redesigned system was evaluated. This project was funded through the DOE/NETL Innovations for Existing Plants program. It was a Phase II project with the goal of developing mercury control technologies that can achieve 50-70% mercury capture at costs 25-50% less than baseline estimates of $50,000-$70,000/lb of mercury removed. Results from testing at Independence indicate that the DOE goal was successfully achieved. Further improvements in the process are recommended, however. Results from testing at Louisa indicate that the DOE goal was not achievable using the tested high-temperature sorbent. Sorbent screening at Council Bluffs also indicated that traditional solid sorbents may not achieve significant mercury removal in hot-side applications.

Sharon Sjostrom

2008-02-09T23:59:59.000Z

369

2014 SunShot Initiative Portfolio Book: Soft Costs  

Broader source: Energy.gov [DOE]

The 2014 SunShot Initiative Portfolio Book outlines the progress towards the goals outlined in the SunShot Vision Study. Contents include overviews of each of SunShots five subprogram areas, as well as a description of every active project in the SunShots project portfolio as of May 2014. This section includes a letter from Program Manager Dr. Elaine Ulrich, providing an overview of SunShots work in the soft costs/balance of systems subprogram, as well as a description of every active soft costs project in the portfolio.

370

Fuel Cell System Cost for Transporationa--2008 Cost Estimate  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fuel Cell System Cost for Fuel Cell System Cost for Transportation-2008 Cost Estimate National Renewable Energy Laboratory 1617 Cole Boulevard * Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Independent Review Published for the U.S. Department of Energy Hydrogen Program NREL/BK-6A1-45457 May 2009 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

371

Test Methods Standing Technical Committee Presentation  

Broader source: Energy.gov (indexed) [DOE]

Test Methods Standing Technical Committee Test Methods Standing Technical Committee buildingamerica.gov Residential Building Technology Program Building America Test Methods STC BA Stakeholder Meeting Leap Day, 2012 Austin, TX 2 | Building America Test Methods Standing Technical Committee buildingamerica.gov Test Methods STC: Roles Update Field Test: Advanced Test / Audit Methods Key Role: Identify Needs for Field Test Methods & Sensors Targets: Field Performance Measurements: Accurate, Low-Cost & Simple Methods Safety & Durability Checks QA/QC Tools Laboratory Test: Support & Coordination Key Role: Identify Performance Data Gaps for Modeling/Simulation (with Analysis STC) Targets: Ensure Laboratory Data & Models Exist for Comparison to Field Test Avoid Duplication of Efforts

372

Designing for cost In an aerospace company  

E-Print Network [OSTI]

Companies take different approaches, and achieve different degrees of implementation, in designing products for cost. This thesis discusses Target Costing and its application at The Boeing Company. Target Costing is a ...

Hammar, Elizabeth (Elizabeth Deming)

2014-01-01T23:59:59.000Z

373

Maintenance cost studies of present aircraft subsystems  

E-Print Network [OSTI]

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

374

Total cost model for making sourcing decisions  

E-Print Network [OSTI]

This thesis develops a total cost model based on the work done during a six month internship with ABB. In order to help ABB better focus on low cost country sourcing, a total cost model was developed for sourcing decisions. ...

Morita, Mark, M.B.A. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

375

Pipeline compressor station construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for pipeline compressor station construction costs by analysing individual compressor station cost components using historical compressor station cost data between 1992 and 2008. Distribution and share of these pipeline compressor station cost components are assessed based on compressor station capacity, year of completion, and locations. Average unit costs in material, labour, miscellaneous, land, and total costs are $866/hp, $466/hp, $367/hp, $13/hp, and $1,712/hp, respectively. Primary costs for compressor stations are material cost, approximately 50.6% of the total cost. This study conducts a learning curve analysis to investigate the learning rate of material and labour costs for different groups. Results show that learning rates and construction component costs vary by capacity and locations. This study also investigates the causes of pipeline compressor station construction cost differences. [Received: March 25, 2012; Accepted; 20 February 2013

Yipeng Zhao; Zhenhua Rui

2014-01-01T23:59:59.000Z

376

The relative cost of biomass energy transport  

Science Journals Connector (OSTI)

Logistics cost, the cost of moving feedstock or products, is a key component of the overall cost of recovering energy from biomass. In this study, we calculate for ... , rail, ship, and pipeline for three biomass

Erin Searcy; Peter Flynn; Emad Ghafoori

2007-01-01T23:59:59.000Z

377

The Relative Cost of Biomass Energy Transport  

Science Journals Connector (OSTI)

Logistics cost, the cost of moving feedstock or products, is a key component of the overall cost of recovering energy from biomass. In this study, we calculate for ... , rail, ship, and pipeline for three biomass

Erin Searcy; Peter Flynn; Emad Ghafoori

2007-01-01T23:59:59.000Z

378

RaisingRivals'FixedCosts Matthew Olczak  

E-Print Network [OSTI]

. In addition much of the recent Industrial Organisation literature has focused on the importance of sunk costs, whereas this paper considers fixed costs that do not have to be sunk costs. A set of guidelines produced

Feigon, Brooke

379

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network [OSTI]

to hydrogen storage vessels and compressors. Feedstock CostHydrogen Production Equipment Purifier Storage System Compressor Dispenser Additional Equipment Installation Costshydrogen equipment costs. Meyers [2] provides an in depth analyses of reformer, compressor, and storage equipment costs.

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2006-01-01T23:59:59.000Z

380

DOE/EA-1494; Final Environmental Assessment for Activities Using Biological Simulants and Releases of Chemicals at the Nevada Test Site (June 2004)  

Broader source: Energy.gov (indexed) [DOE]

494 FINAL ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES 494 FINAL ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES USING BIOLOGICAL SIMULANTS AND RELEASES OF CHEMICALS June 2004 v Table of Contents Section Page ACRONYMS AND ABBREVIATIONS.................................................................................................. viii GLOSSARY ................................................................................................................................. GL-1 EXECUTIVE SUMMARY .....................................................................................................................ES-1 CHAPTER 1.0 PURPOSE AND NEED FOR ACTION..................................................................... 1-1 1.1 Introduction.................................................................................................................

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Flow Test | Open Energy Information  

Open Energy Info (EERE)

Flow Test Flow Test Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Flow Test Details Activities (38) Areas (33) Regions (1) NEPA(3) Exploration Technique Information Exploration Group: Downhole Techniques Exploration Sub Group: Well Testing Techniques Parent Exploration Technique: Well Testing Techniques Information Provided by Technique Lithology: Stratigraphic/Structural: Hydrological: Flow tests provide information on permeability, recharge rates, reservoir pressures, fluid chemistry, and scaling. Thermal: Flow tests can measure temperature variations with time to estimate characteristics about the heat source. Dictionary.png Flow Test: Flow tests are typically conducted shortly after a well has been drilled to test its productivity. The well is opened and fluids are released, the

382

Cost objective PLM and CE  

E-Print Network [OSTI]

Concurrent engineering taking into account product life-cycle factors seems to be one of the industrial challenges of the next years. Cost estimation and management are two main strategic tasks that imply the possibility of managing costs at the earliest stages of product development. This is why it is indispensable to let people from economics and from industrial engineering collaborates in order to find the best solution for enterprise progress for economical factors mastering. The objective of this paper is to present who we try to adapt costing methods in a PLM and CE point of view to the new industrial context and configuration in order to give pertinent decision aid for product and process choices. A very important factor is related to cost management problems when developing new products. A case study is introduced that presents how product development actors have referenced elements to product life-cycle costs and impacts, how they have an idea bout economical indicators when taking decisions during the progression of the project of product development.

Nicolas Perry; Alain Bernard

2010-11-26T23:59:59.000Z

383

Microsoft Word - CR-091 Primary Basis of Cost Savings and Cost...  

Broader source: Energy.gov (indexed) [DOE]

CR-091 Primary Basis of Cost Savings and Cost Savings Amount Custom Fields Primary Basis of Cost Savings and Cost Savings Amount Custom Fields Background On August 29 th , 2013 the...

384

Cost Principles Directives & Procedures Responsible Office: Cost Analysis Effective Date: November 1, 2013  

E-Print Network [OSTI]

1 Cost Principles Directives & Procedures Responsible Office: Cost Analysis Effective Date....................................................................................................................... 2 2. Guiding Principles to Determine the Charge of a Cost to a Sponosred Agreement ................................................................................................. 5 5.1. Personnel Costs

Jawitz, James W.

385

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

386

The development of low cost LiFePO4-based high power lithium-ion batteries  

SciTech Connect (OSTI)

The cycling performance of low-cost LiFePO4-based high-power lithium-ion cells was investigated and the components were analyzed after cycling to determine capacity fade mechanisms. Pouch type LiFePO4/natural graphite cells were assembled and evaluated by constant C/2 cycling, pulse-power and impedance measurements. From post-test electrochemical analysis after cycling, active materials, LiFePO4 and natural graphite, showed no degradation structurally or electrochemically. The main reasons for the capacity fade of cell were lithium inventory loss by side reaction and possible lithium deposition on the anode.

Shim, Joongpyo; Sierra, Azucena; Striebel, Kathryn A.

2003-11-25T23:59:59.000Z

387

NETL: Turbine Projects - Cost Reduction  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Reduction Cost Reduction Turbine Projects Cost Reduction Single Crystal Turbine Blades Enhancing Gas Turbine Efficiency Data/Fact Sheets Enabling and Information Technologies to Increase RAM of Advanced Powerplants Data/Fact Sheets Development of NDE Technology for Environmental Barrier Coating and Residual Life Estimation Data/Fact Sheets Welding and Weld Repair of Single Crystal Gas Turbine Alloy Data/Fact Sheets Combustion Turbine Hot Section Coating Life Management Data/Fact Sheets On-Line Thermal Barrier Coating Monitor for Real-Time Failure Protection and Life Maximization Data/Fact Sheets On-Line Thermal Barrier Coating [PDF] Advanced Monitoring to Improve Combustion Turbine/Combined Cycle RAM Data/Fact Sheets Advanced Monitoring to Improve Combustion Turbine [PDF]

388

Chapter 30 - Cost Accounting Standards Administration | Department...  

Office of Environmental Management (EM)

30 - Cost Accounting Standards Administration Chapter 30 - Cost Accounting Standards Administration 30.1DOE'sOversightofCertainContractorDefinedPensionPlansandItsEffect...

389

Definition: Reduced Electricity Cost | Open Energy Information  

Open Energy Info (EERE)

Cost Jump to: navigation, search Dictionary.png Reduced Electricity Cost Functions that provide this benefit could help alter customer usage patterns (demand response with price...

390

Cost Recovery Charge (CRC) Calculation Tables  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cost Recovery Charge (CRC) Calculation Table Updated: October 6, 2014 FY 2016 September 2014 CRC Calculation Table (pdf) Final FY 2015 CRC Letter & Table (pdf) Note: The Cost...

391

Example Cost Codes for Construction Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

392

Hydrogen refueling station costs in Shanghai  

E-Print Network [OSTI]

pieces of hardware: 1. Hydrogen production equipment (e.g.when evaluating hydrogen production costs. Many analyses inrespect to size and hydrogen production method. These costs

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

393

Benchmark the Fuel Cost of Steam Generation  

Broader source: Energy.gov [DOE]

This tip sheet on benchmarking the fuel cost of steam provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

394

Cost Analysis: Technology, Competitiveness, Market Uncertainty...  

Office of Environmental Management (EM)

policy impacts on system financing, and to perform detailed levelized cost of energy (LCOE) analyses. This shows the path to cost-equalizing as envisioned under the...

395

Cutting Biofuel Production Costs | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cutting Biofuel Production Costs Working to use sunlight to convert biomass to biofuels, researchers have found a pathway toward reducing the energy costs associated with making...

396

PHEV Battery Cost Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PHEV Battery Cost Assessment PHEV Battery Cost Assessment 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting...

397

PHEV Battery Cost Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

PHEV Battery Cost Assessment PHEV Battery Cost Assessment 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

398

Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Drilling and Testing Activity (Frio, Wilcox, and Tuscaloosa Formations, Texas and Louisiana)  

SciTech Connect (OSTI)

The Department of Energy (DOE) has initiated a program to evaluate the feasibility of developing the geothermal-geopressured energy resources of the Louisiana-Texas Gulf Coast. As part of this effort, DOE is contracting for the drilling of design wells to define the nature and extent of the geopressure resource. At each of several sites, one deep well (4000-6400 m) will be drilled and flow tested. One or more shallow wells will also be drilled to dispose of geopressured brines. Each site will require about 2 ha (5 acres) of land. Construction and initial flow testing will take approximately one year. If initial flow testing is successful, a continuous one-year duration flow test will take place at a rate of up to 6400 m{sup 3} (40,000 bbl) per day. Extensive tests will be conducted on the physical and chemical composition of the fluids, on their temperature and flow rate, on fluid disposal techniques, and on the reliability and performance of equipment. Each project will require a maximum of three years to complete drilling, testing, and site restoration.

None

1981-09-01T23:59:59.000Z

399

Entanglement cost in practical scenarios  

E-Print Network [OSTI]

We quantify the one-shot entanglement cost of an arbitrary bipartite state, that is the minimum number of singlets needed by two distant parties to create a single copy of the state up to a finite accuracy, using local operations and classical communication only. This analysis, in contrast to the traditional one, pertains to scenarios of practical relevance, in which resources are finite and transformations can only be achieved approximately. Moreover, it unveils a fundamental relation between two well-known entanglement measures, namely, the Schmidt number and the entanglement of formation. Using this relation, we are able to recover the usual expression of the entanglement cost as a special case.

Francesco Buscemi; Nilanjana Datta

2009-06-19T23:59:59.000Z

400

Quantum cost for sending entanglement  

E-Print Network [OSTI]

Establishing quantum entanglement between two distant parties is an essential step of many protocols in quantum information processing. One possibility for providing long-distance entanglement is to create an entangled composite state within a lab and then physically send one subsystem to a distant lab. However, is this the "cheapest" way? Here, we investigate the minimal "cost" that is necessary for establishing a certain amount of entanglement between two distant parties. We prove that this cost is intrinsically quantum, and is specified by quantum correlations. Our results provide an optimal protocol for entanglement distribution and show that quantum correlations are the essential resource for this task.

Alexander Streltsov; Hermann Kampermann; Dagmar Bru

2012-03-06T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Material Testing of Coated Alloys in a Syngas Combustion Environment Year 6 - Activity 1.13 - Development of a National Center for Hydrogen Technology  

SciTech Connect (OSTI)

Modifications were made to the inlet of the existing Energy & Environmental Research Center (EERC) thermal oxidizer to accommodate side-by-side coupon holders for exposure testing. Two 5-day tests with over 200 hours of total exposure time were completed. The first week of testing was conducted in enriched air-blown mode, with coupon temperatures ranging from 128 to 272F. Carbonyl sampling was conducted, but it was discovered after the fact that the methodology used was producing very low recoveries of iron and nickel carbonyl. Therefore, the data generated during this week of testing were not considered accurate. The second week of testing was conducted in oxygen-blown mode, with coupon temperatures ranging from 220 to 265F. Two improved methods were used to measure carbonyl concentration during this week of testing. These methods produced results closer to equilibrium calculations. Since both weeks of testing mostly produced a product gas with approximately 15%18% carbon monoxide, it was felt that actual carbonyl concentrations for Week 1 should be very similar to those measured during Week 2. The revised carbonyl sampling methodology used during the second week of testing greatly improved the recovery of iron and nickel carbonyl in the sample. Even though the sampling results obtained from the first week were inaccurate, the results from the second week can be used as an estimate for the periods during which the gasifier was operating under similar conditions and producing similar product gas compositions. Specifically, Test Periods 2 and 3 from the first week were similar to the conditions run during the second week. For a product gas containing roughly 15%18% CO and a coupon temperature of approximately 220270F, the nickel carbonyl concentration should be about 0.050.1 ppm and the iron carbonyl concentration should be about 0.10.4 ppm. After each week of testing the coupons were recovered from the coupon holder, weighed, and shipped back to Siemens for analysis.

Swanson, Michael

2011-09-01T23:59:59.000Z

402

Cost-Parity and Cost-Streett Games Nathanael Fijalkow1,2  

E-Print Network [OSTI]

Cost-Parity and Cost-Streett Games Nathana¨el Fijalkow1,2 and Martin Zimmermann2 1 LIAFA, Universit@mimuw.edu.pl Abstract. We consider games played on graphs equipped with costs on edges, and introduce two winning conditions, cost-parity and cost- Streett, which require bounds on the cost between requests

403

Interim Letter Report - Verification Survey Results for Activities Performed in March 2009 for the Vitrification Test Facility Warehouse at the West Valley Demonstration Project, Ashford, New York  

SciTech Connect (OSTI)

The objective of the verification activities was to provide independent radiological surveys and data for use by the Department of Energy (DOE) to ensure that the building satisfies the requirements for release without radiological controls.

B.D. Estes

2009-04-24T23:59:59.000Z

404

Alternative Fuels Data Center: Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Cost Vehicle Cost Calculator to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Delicious Rank Alternative Fuels Data Center: Vehicle Cost Calculator on Digg Find More places to share Alternative Fuels Data Center: Vehicle Cost Calculator on AddThis.com... Vehicle Cost Calculator Vehicle Cost Calculator This tool uses basic information about your driving habits to calculate total cost of ownership and emissions for makes and models of most vehicles, including alternative fuel and advanced technology vehicles. Also

405

New Continuous-Time Scheduling Formulation for Continuous Plants under Variable Electricity Cost  

Science Journals Connector (OSTI)

Equation 21 is a big-M constraint that is only active if there is a continuous task being executed that belongs to energy cost level e. ... Due to the differences in electricity price among the energy cost levels, assigning production to the cheapest levels will have the biggest impact on the total cost. ... While accurate values are obviously dependent on problem data, particularly on the different cost levels agreed with the electricity provider, and on the scheduling practice at the plant, results have shown potential cost savings around 20%. ...

Pedro M. Castro; Iiro Harjunkoski; Ignacio E. Grossmann

2009-06-16T23:59:59.000Z

406

An open-access method for targeting revegetation based on potential for emissions reduction, carbon sequestration and opportunity cost  

Science Journals Connector (OSTI)

Abstract We propose a simple heuristic that uses open-access models and government data on agricultural activities to estimate total carbon emissions from agriculture, the gross carbon benefit and the opportunity cost per tonne CO2-e from revegetating to environmental plantings or plantation forestry. We test this across ten areas of mixed land-use that represent diverse Australian agricultural systems along a rainfall transect. The local value of agricultural production was obtained from government statistics and used to estimate the current economic opportunity cost of converting cleared agricultural land to mixed environmental plantings for carbon sequestration. Gross carbon benefit from revegetation was closely related to current agricultural use, as was financial opportunity cost. These were not related simply to site productivity potential or rainfall. The proportion of land cleared for agriculture that would need to be re-vegetated to achieve a localised zero-carbon land-use scenario was calculated by the ratio of current agricultural emissions to gross carbon benefit from revegetation; this ranged from 13% to 66% for groups of agricultural industries across Australian rainfall transects. While the heuristic does not capture the detail of models built specifically for local research questions it does provide a different lens on the questions policy makers and land managers may ask about the costs and benefits of revegetating agricultural land, and provides open-access methods to guide them.

Andrew Longmire; Chris Taylor; Craig J. Pearson

2015-01-01T23:59:59.000Z

407

ASSESSMENT OF LOW COST NOVEL SORBENTS FOR COAL-FIRED POWER PLANT MERCURY CONTROL  

SciTech Connect (OSTI)

The injection of sorbents upstream of a particulate control device is one of the most promising methods for controlling mercury emissions from coal-fired utility boilers with electrostatic precipitators and fabric filters. Studies carried out at the bench-, pilot-, and full-scale have shown that a wide variety of factors may influence sorbent mercury removal effectiveness. These factors include mercury species, flue gas composition, process conditions, existing pollution control equipment design, and sorbent characteristics. The objective of the program is to obtain the necessary information to assess the viability of lower cost alternatives to commercially available activated carbon for mercury control in coal-fired utilities. Prior to injection testing, a number of sorbents were tested in a slipstream fixed-bed device both in the laboratory and at two field sites. Based upon the performance of the sorbents in a fixed-bed device and the estimated cost of mercury control using each sorbent, seventeen sorbents were chosen for screening in a slipstream injection system at a site burning a Western bituminous coal/petcoke blend, five were chosen for screening at a site burning a subbituminous Powder River Basin (PRB) coal, and nineteen sorbents were evaluated at a third site burning a PRB coal. Sorbents evaluated during the program were of various materials, including: activated carbons, treated carbons, other non-activated carbons, and non-carbon material. The economics and performance of the novel sorbents evaluated demonstrate that there are alternatives to the commercial standard. Smaller enterprises may have the opportunity to provide lower price mercury sorbents to power generation customers under the right set of circumstances.

Sharon Sjostrom

2004-03-01T23:59:59.000Z

408

Examples of Cost Estimation Packages  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

1997-03-28T23:59:59.000Z

409

Basic Costs in Electricity Supply  

Science Journals Connector (OSTI)

... ONE of the principal problems in the management of public electricity supply companies is how to reconcile the ... supply companies is how to reconcile the costs with the charges not only from year to year but also in their irregular secular ...

1941-07-12T23:59:59.000Z

410

Market Equilibrium with Transaction Costs  

E-Print Network [OSTI]

Identical products being sold at different prices in different locations is a common phenomenon. Price differences might occur due to various reasons such as shipping costs, trade restrictions and price discrimination. We give a way to model such scenarios by supplementing the classical Fisher model of a market by introducing {\\em transaction costs}. For every buyer $i$ and every good $j$, there is a transaction cost of $\\cij$; if the price of good $j$ is $p_j$, then the cost to the buyer $i$ {\\em per unit} of $j$ is $p_j + \\cij$. This allows the same good to be sold at different (effective) prices to different buyers. We study questions regarding existence, uniqueness and computability of equilibrium in such a model. Our results can be summarized as such: The convex program of \\cite{Dev09} can be generalized to prove existence and uniqueness of equilibrium. We also provide a combinatorial algorithm that computes $\\epsilon$-approximate equilibrium prices and allocations in $O(\\frac{1}{\\epsilon}(n+\\log{m})mn\\l...

Chakraborty, Sourav; Karande, Chinmay

2010-01-01T23:59:59.000Z

411

An Attack on Centrifugal Costs  

E-Print Network [OSTI]

AN ATTACK ON CENTRIFUGAL COSTS j P. ~,t~~c1ier Mwra~ I Mons'anto ' Alvin, 'ie~as I ABSTRACT Energy conservation in small and medium horse power industrial centrifugal power users has re ceived very little attention to date. Monsanto...

Murray, P. F.

412

Oil cost hits ship studies  

Science Journals Connector (OSTI)

... March 2007 to March 2009, are under threat because of the steep rise in marine-fuel costs. Hundreds of Arctic and Antarctic scientists face uncertainty as polar science programmes worldwide ... scientists face uncertainty as polar science programmes worldwide are curtailed, postponed or cancelled. The price of a barrel of oil has more than doubled since March 2007, from US$ ...

Quirin Schiermeier

2008-07-23T23:59:59.000Z

413

The embedded energy costs in solar energy systems  

SciTech Connect (OSTI)

The paper compares the results of net energy analyses performed for active solar thermal and photovoltaic energy systems with that of conventional power generating systems. Current U.S. solar technology commercialization programs are discussed from the viewpoint of embedded (hidden) material and resource costs.

Baron, S.

1984-08-01T23:59:59.000Z

414

COST 227/08 1 European Cooperation  

E-Print Network [OSTI]

COST 227/08 1 DG C II EN European Cooperation in the field of Scientific and Technical Research - COST - -------------------- Secretariat ------- Brussels, 2 July 2008 COST 227/08 MEMORANDUM Action designated as COST Action ES0801: The ocean chemistry of bioactive trace elements and paleoclimate

Henderson, Gideon

415

COST 4138/10 1 European Cooperation  

E-Print Network [OSTI]

COST 4138/10 1 EN European Cooperation in Science and Technology - COST - -------------------- Secretariat ------- Brussels, 2 July 2010 COST 4138/10 MEMORANDUM OF UNDERSTANDING Subject : Memorandum of Understanding for the implementation of a European Concerted Research Action designated as COST Action FP1002

416

COST SHARING ON SPONSORED PROGRAMS Policy Statement  

E-Print Network [OSTI]

Page 1 COST SHARING ON SPONSORED PROGRAMS Policy Statement Northwestern University engages in cost and compelling circumstances. This document was developed to set forth University policy on cost sharing, and to provide guidance on the appropriate and consistent management and reporting of cost sharing throughout

Shahriar, Selim

417

WVU Personal Rapid Transit Benefit Cost Analysis  

E-Print Network [OSTI]

....................................................................... 6 Demographic Trends - Engineering Station .................................................................... 7 Demographic Trends - Engineering Station ............................................................................. 18 Economic Cost of Increased Congestion

Mohaghegh, Shahab

418

Conservation Cost-Effectiveness Determination Methodology  

E-Print Network [OSTI]

Conservation Cost-Effectiveness Determination Methodology CONSERVATION COST-EFFECTIVENESS As with all other resources, the Council uses its portfolio model to determine how much conservation is cost the amount of savings achievable at varying costs. In order to capture the impact of variations in wholesale

419

Technological Feasibility and Cost Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Analysis Methodologies Technological Feasibility and Cost Analysis Technological Feasibility and Cost Analysis Technology Feasibility and Cost Analysis is performed...

420

Automation of testing for current limits and serial peripheral interfaces with 10ns timing resolution.  

E-Print Network [OSTI]

??Conventional bench testing can be a costly and slow method of validating a device. Complications from test setups and changes in equipment can also contribute (more)

Kuper, Jared

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Interruption Cost Estimate Calculator | Open Energy Information  

Open Energy Info (EERE)

Interruption Cost Estimate Calculator Interruption Cost Estimate Calculator Jump to: navigation, search Tool Summary Name: Interruption Cost Estimate (ICE) Calculator Agency/Company /Organization: Freeman, Sullivan & Co. Sector: Energy Focus Area: Grid Assessment and Integration, Energy Efficiency Resource Type: Online calculator, Software/modeling tools User Interface: Website Website: icecalculator.com/ Country: United States Cost: Free Northern America References: [1] Logo: Interruption Cost Estimate (ICE) Calculator This calculator is a tool designed for electric reliability planners at utilities, government organizations or other entities that are interested in estimating interruption costs and/or the benefits associated with reliability improvements. About The Interruption Cost Estimate (ICE) Calculator is an electric reliability

422

Transparent Cost Database | Open Energy Information  

Open Energy Info (EERE)

Transparent Cost Database Transparent Cost Database Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Transparent Cost Database Agency/Company /Organization: Department of Energy Partner: National Renewable Energy Laboratory Sector: Energy Focus Area: Renewable Energy, Solar, Transportation Topics: Baseline projection, Low emission development planning, -LEDS, Resource assessment, Technology characterizations Resource Type: Dataset, Lessons learned/best practices, Software/modeling tools User Interface: Website Web Application Link: en.openei.org/apps/TCDB/ Cost: Free OpenEI Keyword(s): Featured Equivalent URI: cleanenergysolutions.org/content/united-states-transparent-cost-databa Language: English The Transparent Cost Database collects program cost and performance

423

Part cost estimation at early design phase  

Science Journals Connector (OSTI)

Abstract Although 70% of part cost is determined during the early design stage, designers rarely accurately estimate the costs of their designs. Based on extensive literature review, in-depth industrial survey and close collaboration with multiple manufacturers, forty factors were identified as governing part cost and ranked according to cost impact. Based on parameter ranking and availability at the early stages of design, a cost estimator for designers is proposed. As the design progresses and more parameters become available, a more accurate cost model is derived and proposed to manufacturers. Results are analyzed and compared to actual manufacturing costing demonstrating good fit.

Gila Molcho; Asher Cristal; Moshe Shpitalni

2014-01-01T23:59:59.000Z

424

SunShot Initiative: Reducing Photovoltaic Costs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reducing Photovoltaic Costs to Reducing Photovoltaic Costs to someone by E-mail Share SunShot Initiative: Reducing Photovoltaic Costs on Facebook Tweet about SunShot Initiative: Reducing Photovoltaic Costs on Twitter Bookmark SunShot Initiative: Reducing Photovoltaic Costs on Google Bookmark SunShot Initiative: Reducing Photovoltaic Costs on Delicious Rank SunShot Initiative: Reducing Photovoltaic Costs on Digg Find More places to share SunShot Initiative: Reducing Photovoltaic Costs on AddThis.com... Concentrating Solar Power Photovoltaics Research & Development Competitive Awards Systems Integration Balance of Systems Reducing Photovoltaic Costs Photo of gloved hands pouring liquid from a glass bottle to glass beaker. Past Incubator awardee, Innovalight, is creating high-efficiency, low-cost

425

Idaho National Laboratory Testing of Advanced Technology Vehicles  

Broader source: Energy.gov (indexed) [DOE]

(not modeled) instrumentation and data collection of vehicle charging demand and energy costs at Tacoma Power, in Tacoma Washington * Tested PHEVs with lithium batteries...

426

Low-Cost Titanium Alloy Production | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cost Titanium Alloy Production Low-Cost Titanium Alloy Production titaniumalloyproduction.pdf More Documents & Publications Low Cost Titanium Propulsion Applications Low Cost...

427

Testing in Software Product Lines.  

E-Print Network [OSTI]

??This thesis presents research aimed at investigating different activities involved in software product lines testing process and possible improvements towards achieving developing high quality software (more)

Odia, Osaretin

2007-01-01T23:59:59.000Z

428

Low Cost Autothermal Diesel Reforming Catalyst Development  

SciTech Connect (OSTI)

Catalytic autothermal reforming (ATR) represents an important step of converting fossil fuel to hydrogen rich reformate for use in solid oxide fuel cell (SOFC) stacks. The state-of-the-art reforming catalyst, at present, is a Rh based material which is effective but costly. The objective of our current research is to reduce the catalyst cost by finding an efficient ATR catalyst containing no rhodium. A group of perovskite based catalysts have been synthesized and evaluated under the reforming condition of a diesel surrogate fuel. Hydrogen yield, reforming efficiency, and conversion selectivity to carbon oxides of the catalyst ATR reaction are calculated and compared with the benchmark Rh based material. Several catalyst synthesis improvements were carried out including: 1) selectively doping metals on the A-site and B-site of the perovskite structure, 2) changing the support from perovskite to alumina, 3) altering the method of metal addition, and 4) using transition metals instead of noble metals. It was found that the catalytic activity changed little with modification of the A-site metal, while it displayed considerable dependence on the B-site metal. Perovskite supports performed much better than alumina based supports.

Shihadeh, J.; Liu, D.

2004-01-01T23:59:59.000Z

429

US costs of verification and compliance under pending arms treaties  

SciTech Connect (OSTI)

The study examines the costs to the United States of compliance and verification associated with four new arms control treaties and one arms agreement. All five of these major accords are in advanced stages of negotiation or ratification. The five accords are: a Strategic Arms Reductions Talks (START) treaty; a Conventional Forces in Europe (CFE) treaty; a Threshold Test Ban Treaty (TTBT); a Peaceful Nuclear Explosions Treaty (PNET); and a Chemical Weapons Agreement (CWA). The cost estimates in the study are based on information about the status of the accords as of the summer of 1990.

O'Hanlon, M.

1990-09-01T23:59:59.000Z

430

Overview and Progress of the Battery Testing, Analysis, and Design...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Battery Testing, Analysis, and Design Activity Overview and Progress of the Battery Testing, Analysis, and Design Activity 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

431

Flow Test At Wister Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Wister Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Wister Area (DOE GTP) Exploration Activity...

432

Flow Test At Colrado Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Colrado Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Colrado Area (DOE GTP) Exploration Activity...

433

Flow Test At Alum Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Alum Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Alum Area (DOE GTP) Exploration Activity Details...

434

6 - Enterprise Web Application Testing  

Science Journals Connector (OSTI)

A robust software testing strategy is essential for bulletproofing an enterprise application and for a quality delivery within the planned cost and quality. We have seen some testing strategies specific to scalability, availability, and performance in previous chapters. This chapter complements those testing methodologies by elaborating on testing best practices and testing methodologies that can be adopted for testing enterprise web applications. Creating a rock-solid testing strategy is a creative and multi-dimensional effort requiring intricate knowledge of the domain, technology, and scenario in which the end user operates. With the emergence of various enterprise web technologies, traditional testing methods fall short of meeting various end-user expectations. This chapter focuses on the challenges with testing in general and web testing methods in particular. The chapter then lays out the critical success factors for a sound testing strategy in enterprise application testing. It provides novel end-to-end software testing methodologies, starting from the testing estimation model, up through postproduction for enterprise web applications. The key pillars of the testing strategy proposed in this chapter are based on user-centric, complete validation, automation, proactive problem detection and prevention and performance focus (the UCAPP model). The chapter provides sample testing metrics, testing processes, for implementation of proposed testing strategy. The chapter also provides detailed insights from comprehensive analysis of successfully implemented enterprise web applications, software testing trends, and best practices implemented successfully in large-scale enterprise projects to achieve high availability in enterprise applications. The chapter provides enterprise testing principles with a special focus on enterprise web scenarios. In previous chapters, we saw the testing processes, best practices, and techniques applicable for each of the quality attributesscalability, availability, and performance. This chapter extends those concepts and covers the remaining aspects of testing such as testing principles, process, and techniques applicable to generic projects and enterprise web projects.

Shailesh Kumar Shivakumar

2015-01-01T23:59:59.000Z

435

1998 Cost and Quality Annual  

Gasoline and Diesel Fuel Update (EIA)

8) 8) Distribution Category UC-950 Cost and Quality of Fuels for Electric Utility Plants 1998 Tables June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts The annual publication Cost and Quality of Fuels for Electric Utility Plants (C&Q) is no longer published by the EIA. The tables presented in this document are intended to replace that annual publication. Questions regarding the availability of these data should

436

Entanglement Cost of Nonlocal Measurements  

E-Print Network [OSTI]

For certain joint measurements on a pair of spatially separated particles, we ask how much entanglement is needed to carry out the measurement exactly. For a class of orthogonal measurements on two qubits with partially entangled eigenstates, we present upper and lower bounds on the entanglement cost. The upper bound is based on a recent result by D. Berry [Phys. Rev. A 75, 032349 (2007)]. The lower bound, based on the entanglement production capacity of the measurement, implies that for almost all measurements in the class we consider, the entanglement required to perform the measurement is strictly greater than the average entanglement of its eigenstates. On the other hand, we show that for any complete measurement in d x d dimensions that is invariant under all local Pauli operations, the cost of the measurement is exactly equal to the average entanglement of the states associated with the outcomes.

Somshubhro Bandyopadhyay; Gilles Brassard; Shelby Kimmel; William K. Wootters

2008-09-12T23:59:59.000Z

437

Entanglement cost of nonlocal measurements  

SciTech Connect (OSTI)

For certain joint measurements on a pair of spatially separated particles, we ask how much entanglement is needed to carry out the measurement exactly. For a class of orthogonal measurements on two qubits with partially entangled eigenstates, we present upper and lower bounds on the entanglement cost. The upper bound is based on a recent result by Berry [Phys. Rev. A 75, 032349 (2007)]. The lower bound, based on the entanglement production capacity of the measurement, implies that for almost all measurements in the class we consider, the entanglement required to perform the measurement is strictly greater than the average entanglement of its eigenstates. On the other hand, we show that for any complete measurement in dxd dimensions that is invariant under all local generalized Pauli operations, the cost of the measurement is exactly equal to the average entanglement of the states associated with the outcomes.

Bandyopadhyay, Somshubhro; Brassard, Gilles [Departement IRO, Universite de Montreal, Montreal, Quebec, H3C 3J7 (Canada); Kimmel, Shelby; Wootters, William K. [Department of Physics, Williams College, Williamstown, Massachusetts 01267 (United States)

2009-07-15T23:59:59.000Z

438

Estimated Cost Description Determination Date:  

Broader source: Energy.gov (indexed) [DOE]

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

439

Consumer Winter Heating Oil Costs  

Gasoline and Diesel Fuel Update (EIA)

6 6 Notes: The outlook for heating oil costs this winter, due to high crude oil costs and tight heating oil supplies, breaks down to an expected increase in heating expenditures for a typical oil-heated household of more than $200 this winter, the result of an 18% increase in the average price and an 11% increase in consumption. The consumption increase is due to the colder than normal temperatures experienced so far this winter and our expectations of normal winter weather for the rest of this heating season. Last winter, Northeast heating oil (and diesel fuel) markets experienced an extremely sharp spike in prices when a severe weather situation developed in late January. It is virtually impossible to gauge the probability of a similar (or worse) price shock recurring this winter,

440

Entanglement Cost of Quantum Channels  

E-Print Network [OSTI]

The entanglement cost of a quantum channel is the minimal rate at which entanglement (between sender and receiver) is needed in order to simulate many copies of a quantum channel in the presence of free classical communication. In this paper we show how to express this quantity as a regularized optimization of the entanglement formation over states that can be generated between sender and receiver. Our formula is the channel analog of a well-known formula for the entanglement cost of quantum states in terms of the entanglement of formation; and shares a similar relation to the recently shattered hope for additivity. The entanglement cost of a quantum channel can be seen as the analog of the quantum reverse Shannon theorem in the case where free classical communication is allowed. The techniques used in the proof of our result are then also inspired by a recent proof of the quantum reverse Shannon theorem and feature the one-shot formalism for quantum information theory, the post-selection technique for quantum channels as well as von Neumann's minimax theorem. We discuss two applications of our result. First, we are able to link the security in the noisy-storage model to a problem of sending quantum rather than classical information through the adversary's storage device. This not only improves the range of parameters where security can be shown, but also allows us to prove security for storage devices for which no results were known before. Second, our result has consequences for the study of the strong converse quantum capacity. Here, we show that any coding scheme that sends quantum information through a quantum channel at a rate larger than the entanglement cost of the channel has an exponentially small fidelity.

Mario Berta; Fernando Brandao; Matthias Christandl; Stephanie Wehner

2011-08-26T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Energy Cost of Information Transfer  

Science Journals Connector (OSTI)

From thermodynamic and causality considerations a general upper bound on the rate at which information can be transferred in terms of the message energy is inferred. This bound is consistent with Shannon's bounds for a band-limited channel. It prescribes the minimum energy cost for information transferred over a given time interval. As an application, a fundamental upper bound of 1015 operations/sec on the speed of an ideal digital computer is established.

Jacob D. Bekenstein

1981-03-09T23:59:59.000Z

442

Test of electron beam technology on Savannah River Laboratory low-activity aqueous waste for destruction of benzene, benzene derivatives, and bacteria  

SciTech Connect (OSTI)

High energy radiation was studied as a means for destroying hazardous organic chemical wastes. Tests were conducted at bench scale with a {sup 60}Co source, and at full scale (387 l/min) with a 1.5 MV electron beam source. Bench scale tests for both benzene and phenol included 32 permutations of water quality factors. For some water qualities, as much as 99.99% of benzene or 90% of phenol were removed by 775 krads of {sup 60}Co irradiation. Full scale testing for destruction of benzene in a simulated waste-water mix showed loss of 97% of benzene following an 800 krad dose and 88% following a 500 krad dose. At these loss rates, approximately 5 Mrad of electron beam irradiation is required to reduce concentrations from 100 g/l to drinking water quality (5 {mu}g/l). Since many waste streams are also inhabited by bacterial populations which may affect filtering operations, the effect of irradiation on those populations was also studied. {sup 60}Co and electron beam irradiation were both lethal to the bacteria studied at irradiation levels far lower than were necessary to remove organic contaminants.

Dougal, R.A. [Univ. of South Carolina, Columbia, SC (United States). Dept. of Electrical and Computer Engineering

1993-08-01T23:59:59.000Z

443

Test Cell Location  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mazda 3 i-Stop Mazda 3 i-Stop Test Cell Location APRF- 4WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional- Start Stop Vehicle Dynamometer Input Document Date 11/20/2012 Advanced Powertrain Research Facility Test weight [lb] 3250 Vehicle Dynamometer Input Document Date 11/20/2012 Revision Number 1 Advanced Powertrain Research Facility Test weight [lb] Target A [lb] 3250 31.2 Target B [lb/mph] Target C [lb/mph^2] 0.462 0.014 Test Fuel Information - Vehicle equipped with with i-Stop package - Manual Transmission - All tests completed in ECO mode - EPA shift schedule modified based on vehicle shift light activity Revision Number 1 Notes: Fuel type EPA Tier II EEE Gasoline Test Fuel Information - Vehicle equipped with with i-Stop package

444

Module: Activity Data for Deforestation | Open Energy Information  

Open Energy Info (EERE)

Website: www.leafasia.orgtoolstechnical-guidance-series-activity-data-defores Cost: Free Language: English Module: Activity Data for Deforestation Screenshot Logo: Module:...

445

Random Testing versus Partition Testing.  

E-Print Network [OSTI]

?? The difference between Partition Testing and Random Testing has been thoroughlyinvestigated theoretically. In this thesis we present a practical study ofthe differences between random (more)

Oftedal, Kristian

2011-01-01T23:59:59.000Z

446

Math 373 Fall 2013 Test 1  

E-Print Network [OSTI]

Math 373. Fall 2013. Test 1. September 26, 2013. 1. Zach buys a billiards table for his apartment. The cost of the table is 4000 and he uses a loan to pay for the...

jeffb_000

2014-01-14T23:59:59.000Z

447

Quality assurance and testing for safety systems  

Science Journals Connector (OSTI)

In this paper we identify special quality assurance and test requirements of software for safety systems and show that even the best currently available practices meet these requirements only at very high cost and by application of empirical ...

Herbert Hecht; Myron Hecht

1997-01-01T23:59:59.000Z

448

Improving Unit Operations-Test Station Performance  

E-Print Network [OSTI]

) usage. The basic concept evaluates the varying criterias affecting these elements and their direct impact on production/test station operating costs. Second consideration explores other methods available to enhance mechanical compatibility with operator...

Filak, J. J. Jr.

449

Rebalancing an Investment Portfolio in the Presence of Convex Transaction Costs and Market Impact Costs  

E-Print Network [OSTI]

Rebalancing an Investment Portfolio in the Presence of Convex Transaction Costs and Market Impact transaction costs. The loss to a portfolio from market impact costs is typically modeled with a convex, transaction costs, market impact costs, rebalanc- ing, conic optimization, convex optimization. 1 #12

Mitchell, John E.

450

INDIRECT COST CALCULATION [IN REVERSE] YOU WANT TO CALCULATE THE DIRECT COSTS  

E-Print Network [OSTI]

INDIRECT COST CALCULATION [IN REVERSE] YOU WANT TO CALCULATE THE DIRECT COSTS YOU KNOW WHAT THE TUITION, STIPEND AND EQUIPMENT COSTS ARE YOU KNOW WHAT THE TOTAL COST IS CALCULATION IS USING THE 2010 FED F&A RATE FOR WSU OF 52% (.52) [ DIRECT COST ­ TUITION ­ STIPEND ­ EQUIPMENT] (.52 ) + DIRECT

Finley Jr., Russell L.

451

5. ESTIMATING THE COSTS OF DIGITAL PRESERVATION 5.1 Isolating a `preservation cost'  

E-Print Network [OSTI]

44 5. ESTIMATING THE COSTS OF DIGITAL PRESERVATION 5.1 Isolating a `preservation cost' Deciding preservation is--how much will it cost? One of the problems encountered in trying to answer this question costs do relate specifically to preservation, but this does not mean that those are the only costs

Carr, Leslie

452

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LOW COST REFRACTURING LOW COST REFRACTURING JANUARY 23, 1998 FC9550/96PT14 RMOTC Test Report Number 96PT14 Low Cost Refracturing Rock Creek Enterprises 980 Rock Creek Road Buffalo, Wyoming 82834 (307) 684-5243 (307) 684-0902 (fax) David H. Doyle, Acting Project Manager Rocky Mountain Oilfield Testing Center January 23, 1998 Introduction There are relatively few stimulation options available to owners of marginal or stripper wells. These wells are commonly restricted in their production rates because of formation or wellbore damage near the wellbore. Current services available to remove this damage are compared to the small gains possible from old, marginal wells. Over time, several things can occur that cause the flow of oil into the wellbore to be restricted. First, carbonate or sulfate scale can accumulate around the well or in the perforations. The accumulated scale will block oil from

453

Breaking the Fuel Cell Cost Barrier  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Breaking the Fuel Cell Cost Barrier Breaking the Fuel Cell Cost Barrier AMFC Workshop May 8 th , 2011, Arlington, VA Shimshon Gottesfeld, CTO The Fuel Cell Cost Challenge 2 CellEra's goal - achieve price parity with incumbents earlier on in market entry process ! Mainstream Polymer Electrolyte Fuel Cell ( PEM) Cost Barriers 3 Graphite / stainless steel hardware Acidic membrane Platinum based electrodes Cost barriers deeply embedded in core tech materials BOM-based cost barriers - 90% of stack cost Cost volatility - Platinum $500/Oz - $2,500/Oz The possibility of an OH - ion conducting membrane 4 Non-acidic membrane CellEra Took Advantage of this Opportunity A new type of membrane component with potential for strong fuel cell cost cuts was revealed in 2006, but was accompanied by general industry skepticism

454

Cost of Fuel to General Electricity  

Broader source: Energy.gov (indexed) [DOE]

of Fuel to Generate Electricity of Fuel to Generate Electricity Cost of Fuel to Generate Electricity Herb Emmrich Gas Demand Forecast, Economic Analysis & Tariffs Manager SCG/SDG&E SCG/SDG&E Federal Utility Partnership Working Group (FUPWG) 2009 Fall Meeting November 18, 2009 Ontario, California The Six Main Costs to Price Electricity are:  Capital costs - the cost of capital investment (debt & equity), depreciation, Federal & State income taxes and property taxes and property taxes  Fuel costs based on fuel used to generate electricity - hydro, natural gas, coal, fuel oil, wind, solar, photovoltaic geothermal biogas photovoltaic, geothermal, biogas  Operating and maintenance costs  Transmission costs  Distribution costs  Social adder costs - GHG adder, low income adder,

455

Development of surface mine cost estimating equations  

SciTech Connect (OSTI)

Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

Not Available

1980-09-26T23:59:59.000Z

456

How Credit Market Conditions Impact the Effect of Voluntary Disclosure on Firms' Cost of Debt Capital  

E-Print Network [OSTI]

(abundant) suggesting that they value voluntary disclosure from borrowers differentially across credit market regimes. I draw upon the economic and finance literature on credit rationing to test whether the effects of voluntary disclosure on firms' cost...

Scott, Bret

2012-10-19T23:59:59.000Z

457

Solar disinfection: an approach for low-cost household water treatment technology in Southwestern Ethiopia  

Science Journals Connector (OSTI)

Disinfection of contaminated water using solar radiation (SODIS) is known to inactivate ... study was aiming to test the efficiency of solar disinfection using different water parameters as low-cost household wat...

Awrajaw Dessie; Esayas Alemayehu

2014-01-01T23:59:59.000Z

458

Revealing language deficits following stroke: the cost of doing two things at once  

E-Print Network [OSTI]

The costs of doing two things were assessed for a group of healthy older adults and older adults who were tested at least 6 months after a stroke. A baseline language sample was compared to language samples collected while ...

Kemper, Susan; McDowd, Joan; Pohl, Patricia; Herman, Ruth; Jackson, Susan

2006-01-01T23:59:59.000Z

459

An integrated approach towards efficient, scalable, and low cost thermoelectric waste heat recovery devices for vehicles  

Broader source: Energy.gov [DOE]

Efficient, scalable, and low cost vehicular thermoelectric generators development will include rapid synthesis of thermoelectric materials, different device geometries, heat sink designs, and durability and long-term performance tests

460

Innovative Manufacturing and Materials for Low-Cost Lithium-Ion...  

Broader source: Energy.gov (indexed) [DOE]

* Deliver eight 2 Ah coated stack & control cells by Oct- 12 for DOE testing * Provide cost analysis of these cells by Dec-12 * Evaluate design options for new current collector...

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Combining multivariate analysis and cost analysis in outdoor recreation planning  

Science Journals Connector (OSTI)

Abstract In this paper we examine the usefulness of combining multivariate analysis and costs analysis in recreation planning. Although these approaches have sometimes been developed in previous recreation studies, they have never been combined in this way. We apply this approach to a regional beach planning policy called the Beach Plan, in Aquitaine, south-western France. A multivariate procedure is used to assess the current environmental and social conditions of the 91 beaches included in the Plan. It reveals some connections between the variables we selected at the inventory step and leads to the definition of four homogeneous clusters of sites. We also identify possible social inequities. We find that the partition obtained by the cluster analysis does not coincide with the classification defined in the Plan. This confirms the necessity of an iterative process between inventory and implementation steps. We then examine the cost consequences of the implementation of the Plan. To do so, we define total incremental cost functions which enable us to evaluate the cost impacts of introducing sites in the Plan. We show that the application of the strict efficiency criterion may lead to several socially undesirable effects. We therefore propose an alternative integration path, called the no social cost path, after combining results provided by the multivariate analysis and the cost analysis. Management implications At the inventory stage of recreation planning, multivariate analyses provide a synoptic description of recreational activities, out of a large quantity of data. Multiple correspondence analysis is a factorial method designed to deal with categorical variables The combination of physical and socioeconomic data is of great help to decision makers in defining new social objectives in recreational planning. By identifying possible correlations between the variables, multivariate analyses provide a better understanding of the functioning of sites. In the French case for instance, the level of use and the management effort are much more discriminating than the environmental characteristics of the beaches. Cost analysis aims at giving full account of the variability of management costs at the site level. Several drivers are identified accordingly. Cost analysis is also a means to compare several strategies for implementing the plan. In the present case, ranking the sites according to a pure efficiency criterion may be appealing because it allows for the introduction of 66 sites (out of the 91) into the planning process at a zero overall cost. The selection rule based on the efficiency criterion tends to increase social and economic inequalities between the municipalities. Another selection rule (hereafter called the no social costs) may reduce such undesirable effects.

Jeoffrey Dehez; Sandrine Lyser

2014-01-01T23:59:59.000Z

462

A Simpler, Smarter and More Cost Effective Approach to Regulation |  

Broader source: Energy.gov (indexed) [DOE]

A Simpler, Smarter and More Cost Effective Approach to Regulation A Simpler, Smarter and More Cost Effective Approach to Regulation A Simpler, Smarter and More Cost Effective Approach to Regulation May 26, 2011 - 9:17am Addthis Sean Lev Sean Lev Acting General Counsel & Deputy General Counsel, Environment & Nuclear Programs What does this mean for me? The Department projects a more than 90% reduction in the paperwork burden imposed on recipients of the Department of Energy's financial assistance. The Department is also working to reduce testing burdens. No one likes the burden of paperwork or the headache of navigating a 20-step process just to get an application completed. Earlier this year, President Obama outlined the creation of a 21st-century regulatory system to reduce burdens for American businesses and consumers

463

ROCKY MOUNTAIN OILFIELD TESTING CENTER PROJECT TEST RESULTS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AJUST A PUMP BEAM PUMPING UNIT AJUST A PUMP BEAM PUMPING UNIT FEBRUARY 19, 1997 FC9532 / 95EC1 ROCKY MOUNTAIN OILFIELD TESTING CENTER AJUST A PUMP TEST Rosemond Manufacturing, Inc. (RMI) Prepared for: INDUSTRY PUBLICATION Prepared by: MICHAEL J. TAYLOR Project Manager February 19, 1997 650200/551107:9532 ABSTRACT The Rocky Mountain Oilfield Testing Center (RMOTC) conducted a test of a Model-2000 Ajust A Pump system at the Naval Petroleum Reserve No. 3 (NPR-3). Rosemond Manufacturing, Inc. (RMI) manufactures compact beam-pumping units that incorporate energy-efficient gear boxes. The equipment is designed to reduce operating costs and minimize maintenance labor. This report documents the equipment performance and the results of the Ajust A Pump test. The purpose of the test was to demonstrate claims of energy efficiency and reduced labor requirements. The test showed

464

JET: Electricity cost-aware dynamic workload management in geographically distributed datacenters  

Science Journals Connector (OSTI)

Abstract The ever-increasing operational cost of geographically distributed datacenters has become a critical issue for cloud service providers. To cut the electricity cost of geographically distributed datacenters, several workload management schemes have been proposed. These include Electricity price-aware InteR-datacenter load balancing (EIR), which reduces the electricity cost of active servers by dispatching the workload to datacenters with lower electricity prices, and Cooling-aware IntrA-datacenter load balancing (CIA), which decreases the power consumption of a datacenter by consolidating the workload on servers with high cooling efficiency. However, these existing schemes could incur some undesired results. For example, EIR may result in high electricity cost of cooling systems due to random workload distribution in datacenters. CIA could lead to high electricity cost of active servers since it does not consider the variation of electricity prices. In this paper, we propose a joint inter- and intra-datacenter workload management scheme, Joint ElectriciTy price-aware and cooling efficiency-aware load balancing (JET), to cut the electricity cost of geographically distributed datacenters. JET uses a short processing time to calculate the optimal workload distribution, which trades off the electricity cost of active servers and cooling systems by alternately selecting the electricity prices or the efficiency of a cooling system as the dominating factor to the electricity cost of geographically distributed datacenters. Extensive evaluations show that JET outperforms the existing schemes and achieves substantial reduction in the electricity cost of geographically distributed datacenters.

Zehua Guo; Zhemin Duan; Yang Xu; H. Jonathan Chao

2014-01-01T23:59:59.000Z

465

DOE Hydrogen Analysis Repository: PEMFC Manufacturing Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PEMFC Manufacturing Cost PEMFC Manufacturing Cost Project Summary Full Title: Manufacturing Cost of Stationary Polymer Electrolyte Membrane (PEM) Fuel Cell Systems Project ID: 85 Principal Investigator: Brian James Keywords: Costs; fuel cells; stationary Performer Principal Investigator: Brian James Organization: Directed Technologies, Inc. (DTI) Address: 3601 Wilson Blvd., Suite 650 Arlington, VA 22201 Telephone: 703-243-3383 Email: brian_james@directedtechnologies.com Period of Performance End: November 1999 Project Description Type of Project: Analysis Category: Cross-Cutting Objectives: Estimate the cost of the fuel cell system using the Directed Technologies, Inc. cost database built up over the several years under U.S. Department of Energy and Ford Motor Company contracts.

466

AVTA: Blink AC Level 2 Charging System Testing Results | Department...  

Broader source: Energy.gov (indexed) [DOE]

Blink AC Level 2 Charging System Testing Results AVTA: Blink AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries...

467

AVTA: Schneider AC Level 2 Charging System Testing Results |...  

Broader source: Energy.gov (indexed) [DOE]

Schneider AC Level 2 Charging System Testing Results AVTA: Schneider AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity...

468

AVTA: SPX AC Level 2 Charging System Testing Results | Department...  

Broader source: Energy.gov (indexed) [DOE]

AVTA: SPX AC Level 2 Charging System Testing Results AVTA: SPX AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity...

469

AVTA: Toyota Prius Gen III HEV 2010 Testing Results | Department...  

Broader source: Energy.gov (indexed) [DOE]

Toyota Prius Gen III HEV 2010 Testing Results AVTA: Toyota Prius Gen III HEV 2010 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out...

470

Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs  

Broader source: Energy.gov [DOE]

OE has released a new Smart Grid report describing the activities of three municipal utilities that received funding through the Recovery Act Smart Grid Investment Grant program. "Municipal Utilities' Investment in Smart Grid Technologies Improves Services and Lowers Costs" reports on the benefits of the cities' investments, including improved operating efficiencies, lower costs, shorter outages, and reduced peak demands and electricity consumption.

471

Cost of exposure to trematode cercariae and learned recognition and avoidance of parasitism risk  

E-Print Network [OSTI]

Cost of exposure to trematode cercariae and learned recognition and avoidance of parasitism risk Society of the British Isles Key words: behavioural avoidance; cost of parasitism; host activity; learning cercariae. Parasite-nai¨ve P. promelas showed no evidence of innate recognition or avoidance of cercariae

Wisenden, Brian D.

472

The equal allocation of nonseparable costs: An extension under fuzzy behavior  

Science Journals Connector (OSTI)

By considering the players and the activity levels simultaneously, we propose a consistent solution which is a generalization of the equal allocation of nonseparable costs (EANSC) on fuzzy games. We also adopt two pre-existing concepts from traditional ... Keywords: Axiomatization, Dynamic process, Fuzzy games, Reduced game, The equal allocation of nonseparable costs

Yu-Hsien Liao

2013-11-01T23:59:59.000Z

473

CBE UFAD cost analysis tool: Life cycle cost model, issues and assumptions  

E-Print Network [OSTI]

Building Maintenance and Repair Cost Reference. WhitestoneJ. Wallis and H. Lin. 2008. CBE UFAD Cost Analysis Tool:UFAD First Cost Model, Issues and Assumptions. Center for

Webster, Tom; Benedek, Corinne; Bauman, Fred

2008-01-01T23:59:59.000Z

474

Development of a Low-Cost Rotary Steerable Drilling System  

SciTech Connect (OSTI)

The project had the goal to develop and commercialize a low-cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures to reduce operating costs by a minimum of 50% and lost-in-hole charges by at least 50% over the currently offered systems. The LCRSS system developed under this project does reduce operating costs by 55% and lost-in-hole charges by at least 50%. The developed product is not commercializable in its current form. The overall objective was to develop and commercialize a low cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures (20,000 psi/150 C) while reducing the operating costs by 50% and the lost-in-hole charges by 50% over the currently available systems. The proposed reduction in costs were to be realized through the significant reduction in tool complexity, a corresponding increase in tool reliability as expressed in the mean-time between failure (MTBF), and a reduction in the time and costs required to service tools after each field operation. Ultimately, the LCRSS system was to be capable of drilling 7 7/8 in. to 9 5/8 in. borehole diameters. The project was divided into three Phases, of which Phases I & II were previously completed and reported on, and are part of the case file. Therefore, the previously reported information is not repeated herein. Phase III included the fabrication of two field ready prototypes that were to be subjected to a series of drilling tests at GTI Catoosa, DOE RMOTC, and at customer partnering wells, if possible, as appropriate in the timing of the field test objectives to fully exercise all elements of the LCRSS. These tests were conducted in an iterative process based on a performance/reliability improvement cycle with the goal of demonstrating the system met all aspects required for commercial viability. These tests were conducted to achieve continuous runs of 100+ hours with well trajectories that fully exercised the tool's build/turn/drop/hold target capabilities and its higher end ratings for bit weight, torque and rotary speed. The tool teardowns were rigorously analyzed at the conclusion of each field run to assess component wear rates and to fully document any detrimental behavior(s) observed.

Roney Nazarian

2012-01-31T23:59:59.000Z

475

LOW COST BIOHEATING OIL APPLICATION.  

SciTech Connect (OSTI)

The report describes primarily the results of combustion tests carried out with a soy methyl ester (SME) that can be considered as a biofuel that does not quite meet the ASTM D 6751-02 specifications for biodiesel. The tests were performed in a residential boiler and a commercial boiler. Blends of the SME in distillate fuel (home heating fuel or equivalently, ASTM No.2 fuel oil) were tested in both the boilers. Similar tests had been conducted in a previous project with ASTM biodiesel blends and hence provided a comparison. Blends of the SME in ASTM No.6 oil (residual oil) were also tested in the commercial boiler using a different burner. Physical properties of the blends (in both the petroleum based fuels) were also measured. It was found that the SME blends in the distillate burned, not surprisingly, similarly to biodiesel blends. Reductions in NOx with blending of the SME were the most significant finding as before with biodiesel blends. The blends in No.6 oil also showed reductions in NOx in the commercial boiler combustion tests, though levels with No.6 blends are higher than with No.2 blends as expected. A significant conclusion from the physical property tests was that even the blending of 10% SME with the No.6 oil caused a significant reduction in viscosity, which suggests a potential direction of application of such blends.

KRISHNA,C.R.

2003-05-01T23:59:59.000Z

476

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

477

Advanced tests of wet welded joints  

SciTech Connect (OSTI)

Wet Welding has in former times only been applied to secondary structural components. Nowadays wet welding has become an upcoming repair process due to high process flexibility, its low investment costs and its high versatility. Even the quality of the wet welded joints has been improved remarkably due to intensive and concentrated development activities. However, especially in the North Sea regions owners of offshore structures and classifying authorities still hesitate to recognize the process as a reliable alternative to dry hyperbaric welding repair methods. It therefore requires further activities especially in the field of data development for life prediction of such repaired components. Advanced testing methods are necessary, additional design criteria are to be developed and achievable weldment quality data are to be included in acknowledged and approved standards and recommendations to improve the credibility of the process and to solve the problem of quality assurance for wet welded joints. A comprehensive project, sponsored by the European Community under the Thermie Programme, is in progress to develop new testing procedures to generate the required data and design criteria for the future application of the wet welding process to main components of offshore structures. It is the aim of the project to establish additional fitness for purpose data for this process.

Pachniuk, I. [Stolt Comex Seaway S.A., Marseille (France); Petershagen, H.; Pohl, R. [Univ. Hamburg (Germany); Szelagowski, P.; Drews, O. [GKSS Research Centre, Geesthacht (Germany)

1994-12-31T23:59:59.000Z

478

Seize Opportunities to Reduce Cost  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Specify for maximum energy savings Specify for maximum energy savings Windows must meet local energy code requirements. For even higher energy performance, consider ENERGY STAR windows, which are recommended for low-rise dwellings and are often suitable for mid-rise dwellings as well. For window and storm window options with superior performance in cold climates, check out the U.S. Department of Energy's highly insulating windows purchasing program (see next page). Seize Opportunities to Reduce Cost Government or utility incentives and financing may be available for energy efficiency in low-income housing. Check www.dsireusa.org for up-to-date information on incentive

479

Cost effectiveness of sonic drilling  

SciTech Connect (OSTI)

Sonic drilling (combination of mechanical vibrations and rotary power) is an innovative environmental technology being developed in cooperation with DOE`s Arid-Site Volatile Organic Compounds Integrated Demonstration at Hanford and the Mixed Waste Landfill Integrated Demonstration at Sandia. This report studies the cost effectiveness of sonic drilling compared with cable-tool and mud rotary drilling. Benefit of sonic drilling is its ability to drill in all types of formations without introducing a circulating medium, thus producing little secondary waste at hazardous sites. Progress has been made in addressing the early problems of failures and downtime.

Masten, D.; Booth, S.R.

1996-03-01T23:59:59.000Z

480

Private trucking costs and records  

E-Print Network [OSTI]

were asked of the appro- priate officials in each case. Tbe interviewer observed the methods of keeping cost and operating statistics in order to determine the different systems in use and also to estimate the time and expense involved in keeping... TBB OHR4TIOI Oy TBBXR OMN TROCHE FLBBT@?1956 Losel Xaeareity Total Operation Rsysaeaa: Qrkviag Bayeaaes Motor tueL aa6 Oil Other operatiaO Bryaaeea 855, 104. 00 62?915 ?00 oO? 91?979?$65?00 040?0$7. 00 197 ' 725 ?00 62)054?667?00 911, 7...

Haning, Charles R

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "testing activity cost" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

LOW-COST LED LUMINAIRE FOR GENERAL ILLUMINATION  

SciTech Connect (OSTI)

During this two-year Solid-State Lighting (SSL) Manufacturing R&D project Cree developed novel light emitting diode (LED) technologies contributing to a cost-optimized, efficient LED troffer luminaire platform emitting at ~3500K correlated color temperature (CCT) at a color rendering index (CRI) of >90. To successfully achieve program goals, Cree used a comprehensive approach to address cost reduction of the various optical, thermal and electrical subsystems in the luminaire without impacting performance. These developments built on Crees high- brightness, low-cost LED platforms to design a novel LED component architecture that will enable low-cost troffer luminaire designs with high total system efficacy. The project scope included cost reductions to nearly all major troffer subsystems as well as assembly costs. For example, no thermal management components were included in the troffer, owing to the optimized distribution of compact low- to mid-power LEDs. It is estimated that a significant manufacturing cost savings will result relative to Crees conventional troffers at the start of the project. A chief project accomplishment was the successful development of a new compact, high-efficacy LED component geometry with a broad far-field intensity distribution and even color point vs. emission angle. After further optimization and testing for production, the Cree XQ series of LEDs resulted. XQ LEDs are currently utilized in Crees AR series troffers, and they are being considered for use in other platforms. The XQ lens geometry influenced the independent development of Crees XB-E and XB-G high-voltage LEDs, which also have a broad intensity distribution at high efficacy, and are finding wide implementation in Crees omnidirectional A-lamps.

Lowes, Ted

2014-07-31T23:59:59.000Z

482

Reducing Power Factor Cost | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Power Factor Cost Reducing Power Factor Cost Low power factor is expensive and inefficient. Many utility companies charge an additional fee if your power factor is less than 0.95....

483

Breaking the Fuel Cell Cost Barrier  

Broader source: Energy.gov (indexed) [DOE]

the Fuel Cell Cost Barrier AMFC Workshop May 8 th , 2011, Arlington, VA Shimshon Gottesfeld, CTO The Fuel Cell Cost Challenge 2 CellEra's goal - achieve price parity with...

484

Low-Cost, Lightweight Solar Concentrator  

Broader source: Energy.gov (indexed) [DOE]

sunshot DOEGO-102012-3663 * September 2012 MOTIVATION Solar concentrators currently cost 150-250m 2 , which represents as much as half of the total installed cost for a...

485

Certificate of Current Cost and Pricing Data  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CERTIFICATE OF CURRENT COST AND PRICING DATA (OCT 1997) This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.401 of...

486

Hydrogen Production Cost Estimate Using Biomass Gasification  

E-Print Network [OSTI]

Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory% postconsumer waste #12;i Independent Review Panel Summary Report September 28, 2011 From: Independent Review Panel, Hydrogen Production Cost Estimate Using Biomass Gasification To: Mr. Mark Ruth, NREL, DOE

487

How to Reduce Energy Supply Costs  

E-Print Network [OSTI]

Rising energy costs have many businesses looking for creative ways to reduce their energy usage and lower the costs of energy delivered to their facilities. This paper explores innovative renewable and alternative energy technologies that can help...

Swanson, G.

2007-01-01T23:59:59.000Z

488

COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION COMPARATIVE COSTS OF CALIFORNIA CENTRAL STATION ELECTRICITY GENERATION and Anitha Rednam, Comparative Costs of California Central Station Electricity Generation Technologies Manager Ruben Tavares - Acting Manager ELECTRICITY ANALYSIS OFFICE Sylvia Bender Deputy Director

Laughlin, Robert B.

489

Costs Associated With Propane Vehicle Fueling Infrastructure  

SciTech Connect (OSTI)

This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

Smith, M.; Gonzales, J.

2014-08-01T23:59:59.000Z

490

The real costs of tuition tax credits  

Science Journals Connector (OSTI)

Calculations of the costs of tuition tax credits should include estimates of the induced migration ... by the President's advisors that his 1983 tax credit proposal would cost up to $800 million ... migrants that...

Edwin G. West

1985-01-01T23:59:59.000Z

491

Challenges in estimating waste confinement costs  

SciTech Connect (OSTI)

This paper presents a systems analysis framework for cost estimating and outlines the challenges likely to be confronted during the cost estimating and data base development process. 1 ref., 8 figs.

Rivera, A.L.

1990-01-01T23:59:59.000Z

492

Benchmark the Fuel Cost of Steam Generation  

SciTech Connect (OSTI)

This revised ITP tip sheet on benchmarking the fuel cost of steam provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

493

Sunk Costs and Real Options in Antitrust  

E-Print Network [OSTI]

Sunk costs play a central role in antitrust economics, but are often misunderstood and mismeasured. I will try to clarify some of the conceptual and empirical issues related to sunk costs, and explain their implications ...

Pindyck, Robert S.

2005-07-29T23:59:59.000Z

494

Photovoltaics in 1986: Routes to Low Cost  

Science Journals Connector (OSTI)

A cost based comparison of crystralline silicon (Xtal-Si) cells, amorphous siliccn (a-Si) cells and concentrators is undertaken. It is concluded that crystalline Si cells can lower significantly their cost by ...

Antonio Luque

1987-01-01T23:59:59.000Z

495

Dow Offers Low-Cost Ethylenimine  

Science Journals Connector (OSTI)

New process paves way to commercialization of highly reactive cyclic compound at low cost ... Behind the imine's substantially lower price tag is a new, low-cost commercial process developed by Dow. ...

1963-06-24T23:59:59.000Z

496

Cost Principles Webinar for DOE Grant Recipients  

Broader source: Energy.gov [DOE]

The Office of Management and Budget (OMB) Cost Principles in the Code of Federal Regulations (CFR) define, by organization type, what kinds of costs are allowable or unallowable for reimbursement...

497

How Much Does That Incinerator Cost?  

E-Print Network [OSTI]

Biosecurity on poultry farms includes proper disposal of dead carcasses. In many cases, that means using an incinerator. Calculating the cost of an incinerator means considering long and short-term expenses and the cost of fuel. This publication...

Mukhtar, Saqib; Nash, Catherine; Harman, Wyatte; Padia, Reema

2008-07-25T23:59:59.000Z

498

Life Cycle Cost Analysis for Sustainable Buildings  

Broader source: Energy.gov [DOE]

To help facility managers make sound decisions, FEMP provides guidance and resources on applying life cycle cost analysis (LCCA) to evaluate the cost-effectiveness of energy and water efficiency investments.

499

PHEV Battery Cost Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Meeting, June 7-11, 2010 -- Washington D.C. es001barnett2010o.pdf More Documents & Publications PHEV Battery Cost Assessment PHEV and LEESS Battery Cost Assessment PHEV...

500

Toward Cost-Effective Solar Energy Use  

Science Journals Connector (OSTI)

...cost), then the sale price of grid-connected PV electricity...would have to be hooked up to the grid, and they would have to cost as...superconducting global transmission grid, supercapacitors, flywheels, etc., as promoted by Smalley...

Nathan S. Lewis

2007-02-09T23:59:59.000Z