Powered by Deep Web Technologies
Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Operability test procedure for rotary mode core sampling system {number_sign}3  

SciTech Connect (OSTI)

This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

Farris, T.R.; Jarecki, T.D.

1995-04-26T23:59:59.000Z

2

Operability test procedure for rotary mode core sampling system {number_sign}4  

SciTech Connect (OSTI)

This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

Farris, T.R.; Jarecki, T.D.

1995-04-26T23:59:59.000Z

3

Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement  

SciTech Connect (OSTI)

This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

VanBaalen, R.A.

1995-02-01T23:59:59.000Z

4

Optimum Statistical Test Procedure  

E-Print Network [OSTI]

In this paper we obtain a test which minimizes the sum of the two error probabilities irrespective of whether $\\sigma^2$ is known or unknown.

Rajesh Singh; Jayant Singh; Florentin Smarandache

2009-04-10T23:59:59.000Z

5

Signed-Rank Tests for Censored Matched Pairs  

E-Print Network [OSTI]

Z . (1967), The Theory of Rank Tests, New York: AcademicT. R. (1982), " A Class of Rank Test Procedures for Censored1983), " A Modified Wilcoxon Rank Sum Test for Paired Data,"

Dorota M. Dabrowska

2011-01-01T23:59:59.000Z

6

A general design for energy test procedures  

SciTech Connect (OSTI)

Appliances are increasingly controlled by microprocessors. Unfortunately, energy test procedures have not been modified to capture the positive and negative contributions of the microprocessor to the appliance's energy use. A new test procedure is described which captures both the mechanical and logical features present in many new appliances. We developed an energy test procedure for refrigerators that incorporates most aspects of the proposed new approach. Some of the strengths and weaknesses of the new test are described.

Meier, Alan

2000-06-15T23:59:59.000Z

7

Arts, Science and Engineering Sponsored Project Sign-Off Policy and Procedure  

E-Print Network [OSTI]

Arts, Science and Engineering Sponsored Project Sign-Off Policy and Procedure May 2013 Policy: The following proposals will require Dean's Office approval: 1. Projects requiring additional/new space to be assigned or the renovation/modification of current space or facilities. 2. Projects involving University

Mahon, Bradford Z.

8

Acceptance test procedure for the overview video camera system (OVS)  

SciTech Connect (OSTI)

Acceptance Test Procedure for testing the Light Duty Utility Arm (LDUA) Overview Video Camera System (OVS).

Pardini, A.F.

1995-10-01T23:59:59.000Z

9

2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...  

Energy Savers [EERE]

11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

10

Argonne Facilitation of PHEV Standard Testing Procedure (SAE...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711) Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711) 2009 DOE Hydrogen Program and Vehicle...

11

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for...

12

2014-10-16 Issuance: Energy Conservation Program Test Procedures...  

Office of Environmental Management (EM)

16 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures...

13

Meeting Concerning Potential Test Procedures and Energy Conservation...  

Broader source: Energy.gov (indexed) [DOE]

Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation...

14

2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...  

Broader source: Energy.gov (indexed) [DOE]

0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document...

15

ENERGY STAR Test Procedures and Verification | Department of...  

Energy Savers [EERE]

ENERGY STAR ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and...

16

2014-10-29 Issuance: Energy Conservation Program: Test Procedures...  

Office of Environmental Management (EM)

29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures...

17

Test Procedure for UV Weathering Resistance of Backsheet | Department...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedure for UV Weathering Resistance of Backsheet Test Procedure for UV Weathering Resistance of Backsheet Presented at the PV Module Reliability Workshop, February 26 - 27...

18

2014-04-11 Issuance: Test Procedures for Residential Clothes...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking...

19

CONTROL VALVE TESTING PROCEDURES AND EQUATIONS  

E-Print Network [OSTI]

a coefficient that is independent of valve size and constant for geometrically similar valves. However in the publication "Control Valve Flow Coefficients" by Rahmeyer and Driskell and published in the Pipeline Journal of ASCE. Testing Procedures The flow coefficient is experimentally determined for different valve openings

Rahmeyer, William J.

20

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...  

Broader source: Energy.gov (indexed) [DOE]

Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy (DOE) has...

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

CRAD, System Operating Test Procedures - October 23, 2014 (EA...  

Office of Environmental Management (EM)

System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

22

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

23

TMACS test procedure TP001: Alarm management. Revision 6  

SciTech Connect (OSTI)

The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

Scanlan, P.K.

1994-09-01T23:59:59.000Z

24

NSF ITR Project General Notes on Trypsin Test Procedure  

E-Print Network [OSTI]

NSF ITR Project Fall 2004 General Notes on Trypsin Test Procedure: Automated performance procedure the assay still work"?) Calculation of the Z' ­ Factor (quality criteria) Manual performance procedure: (Uses/purpose of procedure: Setup a new assay. Use as basis for comparison with automated version

Kaber, David B.

25

How to Make Appliance Standards Work: Improving Energy and Water Efficiency Test Procedures  

E-Print Network [OSTI]

Hill. 1996. “Energy test procedures for appliances. ” EnergyWater Efficiency Test Procedures Jim Lutz, Peter Biermayer,Water Efficiency Test Procedures Jim Lutz, Peter Biermayer,

Lutz, Jim

2012-01-01T23:59:59.000Z

26

Geothermal: Sponsored by OSTI -- Testing and sampling procedures...  

Office of Scientific and Technical Information (OSTI)

Testing and sampling procedures for geothermal-compressured wells. Final report Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us HomeBasic Search About...

27

Energy Conservation Program: Test Procedure for Pumps, Notice...  

Broader source: Energy.gov (indexed) [DOE]

This document is Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking. commercialindustrialpumpstpnopr.pdf More Documents & Publications Summary...

28

2014-10-14 Issuance: Test Procedures Correction for Fluorescent...  

Broader source: Energy.gov (indexed) [DOE]

of Proposed Rulemaking 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-04-11 Issuance: Energy...

29

In-Plane Conductivity Testing Procedures and Results  

Broader source: Energy.gov (indexed) [DOE]

Plane Conductivity Testing Procedures & Results Samples Tested: N112 NRE212 NRE211 N117 N1035 N1135 Work performed under subcontract with FSECUCF DOE Award No. DE-FC36-06GO16028...

30

Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)  

SciTech Connect (OSTI)

A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

Baum, Gregory A.

2014-02-01T23:59:59.000Z

31

US advanced battery consortium in-vehicle battery testing procedure  

SciTech Connect (OSTI)

This article describes test procedures to be used as part of a program to monitor the performance of batteries used in electric vehicle applications. The data will be collected as part of an electric vehicle testing program, which will include battery packs from a number of different suppliers. Most data will be collected by on-board systems or from driver logs. The paper describes the test procedure to be implemented for batteries being used in this testing.

NONE

1997-03-01T23:59:59.000Z

32

Acceptance test procedure: RMW Land Disposal Facility Project W-025  

SciTech Connect (OSTI)

This ATP establishes field testing procedures to demonstrate that the electrical/instrumentation system functions as intended by design for the Radioactive Mixed Waste Land Disposal Facility. Procedures are outlined for the field testing of the following: electrical heat trace system; transducers and meter/controllers; pumps; leachate storage tank; and building power and lighting.

Roscha, V. [Westinghouse Hanford Co., Richland, WA (United States)

1994-12-12T23:59:59.000Z

33

Test procedure for boxed waste assay system  

SciTech Connect (OSTI)

This document, prepared by Los Alamos National Laboratory`s NMT-4 group, details the test methodology and requirements for Acceptance/Qualification testing of a Boxed Waste Assay System (BWAS) designed and constructed by Pajarito Scientific Corporation. Testing of the BWAS at the Plutonium Facility (TA55) at Los Alamos National Laboratory will be performed to ascertain system adherence to procurement specification requirements. The test program shall include demonstration of conveyor handling capabilities, gamma ray energy analysis, and imaging passive/active neutron accuracy and sensitivity. Integral to these functions is the system`s embedded operating and data reduction software.

Wachter, J. [Los Alamos National Lab., NM (United States)

1994-12-07T23:59:59.000Z

34

Approved Test Procedures Version 1.1 Release Notes  

E-Print Network [OSTI]

Approved Test Procedures Version 1.1 Release Notes 1 Change Reason for Change 302.a drugdrug, drug allergy In the Informative Test Description section Added clarification to the example. 302.c Problem List In the Informative Test Description section Added the sentence "The test also

35

New energy test procedures for refrigerators and other appliances  

SciTech Connect (OSTI)

Many innovations in refrigerator design rely on microprocessors, sensors, and algorithms to control automatic defrost, variable speed,and other features. Even though these features strongly influence energy consumption, the major energy test procedures presently test only a refrigerator's mechanical efficiency and ignore the ''software'' aspects. We describe a new test procedure where both ''hardware'' and ''software'' tests are fed into a dynamic simulation model. A wide range of conditions can be tested and simulated. This approach promotes international harmonization because the simulation model can also be programmed to estimate energy use for the ISO, DOE, or JIS test. The approach outlined for refrigerators can also be applied to other appliances.

Meier, Alan; Ernebrant, Stefan; Kawamoto, Kaoru; Wihlborg, Mats

1999-04-01T23:59:59.000Z

36

Hanford spent nuclear fuel hot conditioning system test procedure  

SciTech Connect (OSTI)

This document provides the test procedures for cold testing of the prototype Hot Conditioning System (HCS) at the 306E Facility. The primary objective of this testing is to confirm design choices and provide data for the detailed design package prior to procurement of the process equipment. The current scope of testing in this document includes a fabricability study of the HCS, equipment performance testing of the HCS components, heat-up and cool-down cycle simulation, and robotic arm testing.

Cleveland, K.J.

1997-09-16T23:59:59.000Z

37

J1634 SAE BEV Test Procedures  

Broader source: Energy.gov (indexed) [DOE]

EPA, CARB, R&D Problem Statement: Current J1634 10 min "Death by Urban" 250mi 17+ hours of testing, no interruptions allowed 10 min 10 min 10 min 10 min 10 min 10 min 10...

38

acceptance test procedure: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Normal Category Rotorcraft, Amateur-Built Aircraft and (more) Bender, Jeffrey Scott 1999-01-01 77 New test procedure evaluates quality and accuracy of energy analysis tools for...

39

acceptance test procedures: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Normal Category Rotorcraft, Amateur-Built Aircraft and (more) Bender, Jeffrey Scott 1999-01-01 77 New test procedure evaluates quality and accuracy of energy analysis tools for...

40

Webinar: Test Procedure for Battery Chargers; Notice of Data Availability  

Broader source: Energy.gov [DOE]

DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774  (May 15, 2014). For more information, please visit...

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

42

Abnormal operating procedures for ATR (Advanced Test Reactor's) experiment loops  

SciTech Connect (OSTI)

This paper outlines the background from the TMI accident which resulted in the definition and development of function-oriented procedures. It also explains how function-oriented procedures were applied in a task for the Advanced Test Reactor's (ATR) NR experiment loops. Human performance design discrepancies were identified for existing procedures, and were corrected by upgrading them according to current NRC and DOE standards. Finally, specific recommendations are made with respect to future ATR control room and loop improvements, as they relate to the revision of operating procedures within INEL's power reactor program. 8 refs., 4 figs.

Auflick, J.L.

1989-09-01T23:59:59.000Z

43

Acceptance test procedure for High Pressure Water Jet System  

SciTech Connect (OSTI)

The overall objective of the acceptance test is to demonstrate a combined system. This includes associated tools and equipment necessary to perform cleaning in the 105 K East Basin (KE) for achieving optimum reduction in the level of contamination/dose rate on canisters prior to removal from the KE Basin and subsequent packaging for disposal. Acceptance tests shall include necessary hardware to achieve acceptance of the cleaning phase of canisters. This acceptance test procedure will define the acceptance testing criteria of the high pressure water jet cleaning fixture. The focus of this procedure will be to provide guidelines and instructions to control, evaluate and document the acceptance testing for cleaning effectiveness and method(s) of removing the contaminated surface layer from the canister presently identified in KE Basin. Additionally, the desired result of the acceptance test will be to deliver to K Basins a thoroughly tested and proven system for underwater decontamination and dose reduction. This report discusses the acceptance test procedure for the High Pressure Water Jet.

Crystal, J.B.

1995-05-30T23:59:59.000Z

44

2014-03-06 Issuance: Test Procedures for Packaged Terminal Air...  

Broader source: Energy.gov (indexed) [DOE]

Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking 2014-03-06 Issuance: Test Procedures for...

45

2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of...

46

2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a...

47

2015-02-12 Issuance: Test Procedures for Portable Air Conditioners...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking...

48

2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting...  

Broader source: Energy.gov (indexed) [DOE]

16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated...

49

NBSBR 84-2867 Test Procedures for Rating  

E-Print Network [OSTI]

NBSBR 84-2867 Test Procedures for Rating Residential Heating and Cooling Absorption Equipment U the heating mode. Both air-source and ground water source absorption heat pumps are considered, as well as air for estimating the heating and cooling seasonal performance and cost of operation of residential water chillers

Oak Ridge National Laboratory

50

Test Procedure for 170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010  

E-Print Network [OSTI]

Test Procedure for §170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.302 (h) Incorporate Laboratory Test Results This document describes the test procedure for evaluating conformance of complete EHRs or EHR modules1

51

DOT-7A Type A packaging test and evaluation procedure  

SciTech Connect (OSTI)

The purpose of this document is to provide guidance for qualifying a DOT-7A Type A packaging for use. WHC qualifies DOT-7A packaging for two purposes. The first is to provide packages for use by WHC (manufacturer-qualified). The second is to provide a contracted service in support of DOE/EM-76 (DOE-qualified). This document includes descriptions of the performance tests, the personnel involved and their qualifications, appropriate safety and quality assurance considerations, and the procedures to be followed when WHC performs the tests (either as the manufacturer, or on behalf of the DOE`s certification program).

Kelly, D.L., Westinghouse Hanford

1996-06-13T23:59:59.000Z

52

W-026 acceptance test report plant control system software(submittal {number_sign}223.02)  

SciTech Connect (OSTI)

Acceptance Testing of the WRAP 1 Plant Control System software was conducted throughout the construction of WRAP 1 with final testing on the glovebox software being completed in December 1996. The software tests were broken out into five sections; one for each of the four Local Control Units and one for the supervisory software modules. This document contains a completed copy of the software tests along with the applicable test log and completed Exception Test Reports. The ETRs outside the scope of the contractor are not signed off. These will be resolved by the Buyer and all 1280 open issues will be tracked on Buyer`s ETR database pending resolution.

Watson, T.L.

1997-02-14T23:59:59.000Z

53

Test Procedures for Building Energy Simulation Tools | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration atStandardsAnalysisof Energy OfficeTest Procedures

54

2015-02-13 Issuance: Test Procedure for Furnaces and Boilers...  

Energy Savers [EERE]

2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed...

55

2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers...  

Office of Environmental Management (EM)

1-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule This document is a...

56

2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...  

Office of Environmental Management (EM)

27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking...

57

Acceptance test procedure for SY Tank Farm replacement exhauster unit  

SciTech Connect (OSTI)

The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

Becken, G.W.

1994-12-16T23:59:59.000Z

58

2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...  

Broader source: Energy.gov (indexed) [DOE]

Documents & Publications 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-06-18 Issuance: Test...

59

Power and Sample Size Determination for a Stepwise Test Procedure for Finding the Maximum Safe Dose  

E-Print Network [OSTI]

Power and Sample Size Determination for a Stepwise Test Procedure for Finding the Maximum Safe Dose This paper addresses the problem of power and sample size calculation for a stepwise multiple test procedure of a compound. A general expression for the power of this procedure is derived. It is used to find the minimum

Tamhane, Ajit C.

60

Energy use test procedures for appliances: A case study of Japanese refrigerators  

SciTech Connect (OSTI)

The energy test procedure provides a consistent measurement of refrigerator energy consumption, which can be used by engineers, utility forecasters, and consumers. The U.S. and Japanese test procedures for refrigerators differ significantly, so it is impossible to directly compare the performance of unique features, or even determine which units are more efficient. The energy use of 12 Japanese refrigerators (of which 9 were unique models) were measured under the U.S. DOE energy test procedure and compared to that reported by the manufacturers under the Japanese test procedure. The Japanese refrigerators used substantially more electricity with the DOE test.

Meier, A.K.

1987-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Test Procedure for 170.306.h Advance Directives APPROVED Version 1.1 September 24, 2010  

E-Print Network [OSTI]

Test Procedure for §170.306.h Advance Directives APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.306 (h) Advance Directives This document describes the test procedure for evaluating Register on July 28, 2010. The document2 is organized by test procedure and derived test requirements

62

Analysis of material disposition for Illinois {number_sign}6 coal POC testing at the CFFF  

SciTech Connect (OSTI)

The Illinois No.6 coal Proof-of-Concept (POC) bottoming cycle testing began in August of 1987 with test LMF4K. POC testing of this coal was completed in November of 1990 with test LMF4V, and included a total of over 2003 hours of coal-fired operation. This testing was conducted to permit the evaluation of effects of long duration operation on a number of critical design issues. During all of the POC testing, all Heat-Recovery/Seed Recovery (HRSR) components, with the exception of the wet electrostatic precipitator (ESP), were installed and operational. Throughout this time, measurements were made of all major solid feed and product streams entering and leaving the CFFF flow train. In addition, key process variables, including mass flowrates and gas compositions, were measured continuously during testing. Particulate samples were obtained and chemically analyzed, and dust loading measurements, at several locations in the flow train, were made during many of the tests. After testing, major waste and product streams were analyzed for chemical composition. Combined, this information was sufficient to enable an overall mass balance as well as a number of elemental balances to be performed around the flow train for each test.

Jackson, D.M.

1993-06-01T23:59:59.000Z

63

2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

64

ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

65

Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria  

SciTech Connect (OSTI)

This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

2011-08-01T23:59:59.000Z

66

NBSIR 79-1911 Procedures for Testing, Rating,  

E-Print Network [OSTI]

is developed for heat engine-driven air-to-air heat pump systems. The procedures are classified according; heat pump; heating and cooling equipment; heating, ventilating and air conditioning. iii #12 of Engine-Driven Heat Pump Systems B. R. Maxwell NO#QT RM Building Thermal and Service Systems Division

Oak Ridge National Laboratory

67

AVTA: Oil Bypass Filter Specifications and Test Procedures  

Broader source: Energy.gov [DOE]

PuraDYN Oil Bypass Filtration System Evaluation Test Plan methodology is used in the testing of all oil bypass filters on the buses at the Idaho National Laboratory.

68

In-Plane Conductivity Testing Procedures and Results  

Broader source: Energy.gov [DOE]

This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007.

69

Predictive tools for coolant development: An accelerated aging procedure for modeling fleet test results  

SciTech Connect (OSTI)

The objective of this study was to develop an accelerated aging test (AAT) for conventional and extended life coolants that will predict coolant composition and performance after 100,000 or more miles (160,930 km) of use. The procedure was developed by examining the effects of a series of cooling system metals, their surface area and the amount of each used, test temperature, glycol concentration, and test time on important chemical and physical properties of the test coolant. The chemical and physical properties evaluated included the accumulation of glycol degradation products, the depletion rate of active inhibitors, the pH drop, and the presence of corrosion products in solution. In addition, the test coolant performance was evaluated in ASTM D 1384 and D 4340. The effects of variation in the test procedure on the coolant were compared to actual coolant from extended duration fleet tests. The test procedure selected gave test coolant with composition, physical properties, and performance that compared favorably with the fleet test fluid. The test performance was validated by comparing the properties of a series fluids after this test to corresponding fluids removed from vehicles after extended use. An example of fluid development using this procedure is presented. Further areas of investigation are suggested. It is recommended that the general test procedure be considered for adoption as an ASTM test method for evaluation of the extended performance of fluids in automotive and light duty cooling systems.

Gershun, A.V.; Mercer, W.C. [Prestone Products Corp., Danbury, CT (United States)

1999-08-01T23:59:59.000Z

70

Test procedures help ensure accuracy of orifice meters  

SciTech Connect (OSTI)

Orifice meter measurement with a chart recorder has been a standard in the petroleum industry for years. The meter consists of the plate/tube and recorder, requires minimal maintenance and can accurately measure a wide range of flow rates. It must be routinely tested to ensure sustained accuracy. The orifice meter measures differential pressure, static pressure, and temperature. However, the accuracy of the measurement is only as good as the calibration devices used in the test. A typical meter test consists of meter calibration, orifice plate inspection, quality of gas tests, and documentation (test report) to verify the data. The paper describes 19 steps that a gas technician can follow to conduct a thorough meter test.

Fillman, C.R. [Coastal Flow Measurement, Inc., Houston, TX (United States)

1996-07-01T23:59:59.000Z

71

Laboratory testing procedure for evaluation of moving bed catalyst attrition  

SciTech Connect (OSTI)

A laboratory scale attrition test has been designed to simulate particle-particle and particle-wall attrition forces which are similar to those experience in commercial moving bed units. The modified drum test uses two concentric rotating drums to induce particle breakage. Using this test, the distribution of particle shapes and sizes produced by catalyst attrition in a moving bed unit have been successfully duplicated.

Doolin, P.K.; Gainer, D.M.; Hoffman, J.F. (Ashland Petroleum Co., KY (United States). Research and Development Dept.)

1993-11-01T23:59:59.000Z

72

Drilling, logging, and testing information from borehole UE-25 UZ{number_sign}16, Yucca Mountain, Nevada  

SciTech Connect (OSTI)

Borehole UE-25 UZ{number_sign}16 is the first of two boreholes that may be used to determine the subsurface structure at Yucca Mountain by using vertical seismic profiling. This report contains information collected while this borehole was being drilled, logged, and tested from May 27, 1992, to April 22, 1994. It does not contain the vertical seismic profiling data. This report is intended to be used as: (1) a reference for drilling similar boreholes in the same area, (2) a data source on this borehole, and (3) a reference for other information that is available from this borehole. The reference information includes drilling chronology, equipment, parameters, coring methods, penetration rates, completion information, drilling problems, and corrective actions. The data sources include lithology, fracture logs, a list of available borehole logs, and depths at which water was recorded. Other information is listed in an appendix that includes studies done after April 22, 1994.

Thamir, F.; Thordarson, W.; Kume, J.; Rousseau, J. [Geological Survey, Denver, CO (United States). Yucca Mountain Project Branch; Long, R. [Dept. of Energy, Las Vegas, NV (United States); Cunningham, D.M. Jr. [Science Applications International Corp., Las Vegas, NV (United States)

1998-09-01T23:59:59.000Z

73

Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards & Labeling Programs for Copy Machines, External Power Supplies, LED Displays, Residential Gas Cooktops and Televisions  

E-Print Network [OSTI]

2012. “Overview and Test Procedures – AS/NZ 4665 ExternalComparison of Test Procedures and Energy Efficiency CriteriaProcedures

Zheng, Nina

2013-01-01T23:59:59.000Z

74

Test procedures and instructions for Hanford tank waste supernatant cesium removal  

SciTech Connect (OSTI)

This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test using Hanford Double-Shell Slurry Feed supernatant liquor from tank 251-AW-101 in a bench-scale column.Cesium sorbents to be tested include resorcinol-formaldehyde resin and crystalline silicotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-022, Hanford Tank Waste Supernatant Cesium Removal Test Plan.

Hendrickson, D.W., Westinghouse Hanford

1996-05-31T23:59:59.000Z

75

AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT  

SciTech Connect (OSTI)

The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

Snyder, Isabelle B [ORNL] [ORNL

2014-01-01T23:59:59.000Z

76

VERIFICATION TESTING AND DESIGN PROCEDURE FOR FRP GRID REINFORCED CONCRETE SLABS  

E-Print Network [OSTI]

1 VERIFICATION TESTING AND DESIGN PROCEDURE FOR FRP GRID REINFORCED CONCRETE SLABS by Jeffrey J (Civil Engineering) at the UNIVERSITY OF WISCONSIN-MADISON 2009 #12;2 VERIFICATION TESTING AND DESIGN that can be positioned quickly. Initial testing on three dimensional fiber reinforced polymer grids has led

Bank, Lawrence C.

77

Nondestructive Evaluation Quality Procedure: Personnel Qualification and Certification Radiographic Testing-Levels I& II  

SciTech Connect (OSTI)

This Operational Procedure establishes the minimum requirements for the qualification and certification/recertification of Nondestructive Evaluation (NDE) personnel in the nondestructive testing (NDT) radiographic testing (RT) method. This document is in accordance with the American Society for Nondestructive Testing Recommended Practice SNT-TC-1A, 1996, except as amended herein.

Dolan, K; Rikard, R D; Rodriquez, J

2003-07-01T23:59:59.000Z

78

2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

79

2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

80

Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure  

SciTech Connect (OSTI)

The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

ZAKRAJSEK, M.F.

2000-10-17T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

82

Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.  

SciTech Connect (OSTI)

This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

Barnette, Daniel Wayne

2005-10-01T23:59:59.000Z

83

Field tests and new design procedure for laterally loaded drilled shafts in clay  

E-Print Network [OSTI]

FIELD TESTS AND NEW DESIGN PROCEDURE FOR LATERALLY LOADED DRILLED SHAFTS IN CLAY A Thesis by l1ARK WILLIAM BIERSCHWALE Submitted to ihe Graduate College Texas A8M University in partial fulfillment of the requirement for the degree of MASTER... OF SCIENCE December 1980 Major Subject: Civil Engineering FIELD TESTS AND NEW DESIGN PROCEDURE FOR LATERALLY LOADED DRILLED SHAFTS IN CLAY A Thesis by NARK WILLIAM BIERSCHWALE Approved as to style and content by: Harry M. Coyle - Chairman...

Bierschwale, Mark W.

1980-01-01T23:59:59.000Z

84

Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results  

SciTech Connect (OSTI)

This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

Muller, M.

2009-09-01T23:59:59.000Z

85

Round-robin testing of Soleq EV cort according to the SAE J1634 test procedure dated May 1993  

SciTech Connect (OSTI)

The Society of Automotive Engineers Recommended Practice, SAE J1634, {open_quotes}Electric Vehicle Energy Consumption and Range Test Procedure{close_quotes}, May 1993, describes a standard method of determining the range and energy consumption for electric vehicles. Consequent to the U.S. Department of Energy`s (DOE) rulemaking released on February 4, 1994, the EPA is currently considering factoring electric vehicles into the Corporate Average Fuel Economy (CAFE) calculations using the SAE J1634 procedure. The purpose of this project is to provide information regarding the suitability of this recommended practice for determining the energy economy value to be factored into the CAFE. Issues leading to possible inconsistent results (such as the repeatability of the procedure, thoroughness of the procedure`s methods, and variance between different laboratories using different dynamometers) need to be resolved prior to passing legislation which will mandate use of this test in determining the electric vehicle CAFE credit. To this end, separate tests were performed on a Soleq EVcort vehicle by the INEL, the EPA, Ford Motor Company, Southwest Research Institute, and the California Air Resources Board using their own facilities and personnel. Acceptable departures from the driving profile prescribed by SAEJ1634 are not well defined. This deficiency in the procedure is even more noticeable due to the EVcort`s marginal acceleration performance.

Cole, G.H.

1993-05-01T23:59:59.000Z

86

Standard testing procedures for optical fiber and unshielded twisted pair at Sandia National Laboratories. Revision  

SciTech Connect (OSTI)

This revision updates Sandia`s working standard for testing optical fiber and unshielded twisted pair cables included in the Lab-wide telecommunications cabling infrastructure. The purpose of these standard testing procedures is to deliver to all Sandians a reliable, low-maintenance, state-of-the-art, ubiquitous telecommunications cabling infrastructure capable of satisfying all current and future telecommunication needs.

Adams, R.L. [Sandia National Labs., Albuquerque, NM (United States). Communications Dept.

1994-09-01T23:59:59.000Z

87

Test procedures and instructions for single shell tank saltcake cesium removal with crystalline silicotitanate  

SciTech Connect (OSTI)

This document provides specific test procedures and instructions to implement the test plan for the preparation and conduct of a cesium removal test, using Hanford Single Shell Tank Saltcake from tanks 24 t -BY- I 10, 24 1 -U- 108, 24 1 -U- 109, 24 1 -A- I 0 1, and 24 t - S-102, in a bench-scale column. The cesium sorbent to be tested is crystalline siticotitanate. The test plan for which this provides instructions is WHC-SD-RE-TP-024, Hanford Single Shell Tank Saltcake Cesium Removal Test Plan.

Duncan, J.B.

1997-01-07T23:59:59.000Z

88

Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction  

Broader source: Energy.gov [DOE]

On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

89

34.02.99.M2.01 Post-Accident Testing Instructions Page 1 of 3 STANDARD ADMINISTRATIVE PROCEDURE  

E-Print Network [OSTI]

34.02.99.M2.01 Post-Accident Testing Instructions Page 1 of 3 STANDARD ADMINISTRATIVE PROCEDURE 34.02.99.M2.01 Post-Accident Testing Instructions Approved June 15, 1999 Revised March 26, 2010 Next is to set forth responsibilities for those involved in post-accident testing. Procedures

90

Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1  

SciTech Connect (OSTI)

This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

Satoh, J.A.

1995-05-25T23:59:59.000Z

91

Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibility of SF(STEO) ï‚· EIA expectsARCHIVEDTest Procedure

92

Development and testing of a standard procedure for determining the viscous properties of crosslinked fracture fluids  

E-Print Network [OSTI]

of the shear rate at the bob by use of the Kr ieger correction. During the develop- ment of the testing pr ocedur e, it was discover ed that the gel experienced shear degradation when subjected to an incr easing shear rate. Therefore, the shear rate should... always be decreased when measuring these fluids. The applicability of the testing procedure was verified by test- ing gel systems supplied by four service companies with gel concentrations of 0. 48$ and 0. 72$ HPG (40 and 60 Ib/1000 gal, respectively...

Worlow, David Wayne

1987-01-01T23:59:59.000Z

93

2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

94

2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

95

2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

96

Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use  

SciTech Connect (OSTI)

The air-conditioning (A/C) compressor load significantly impacts the fuel economy of conventional vehicles and the fuel use/range of plug-in hybrid electric vehicles (PHEV). A National Renewable Energy Laboratory (NREL) vehicle performance analysis shows the operation of the air conditioner reduces the charge depletion range of a 40-mile range PHEV from 18% to 30% in a worst case hot environment. Designing for air conditioning electrical loads impacts PHEV and electric vehicle (EV) energy storage system size and cost. While automobile manufacturers have climate control procedures to assess A/C performance, and the U.S. EPA has the SCO3 drive cycle to measure indirect A/C emissions, there is no automotive industry consensus on a vehicle level A/C fuel use test procedure. With increasing attention on A/C fuel use due to increased regulatory activities and the development of PHEVs and EVs, a test procedure is needed to accurately assess the impact of climate control loads. A vehicle thermal soak period is recommended, with solar lamps that meet the SCO3 requirements or an alternative heating method such as portable electric heaters. After soaking, the vehicle is operated over repeated drive cycles or at a constant speed until steady-state cabin air temperature is attained. With this method, the cooldown and steady-state A/C fuel use are measured. This method can be run at either different ambient temperatures to provide data for the GREEN-MAC-LCCP model temperature bins or at a single representative ambient temperature. Vehicles with automatic climate systems are allowed to control as designed, while vehicles with manual climate systems are adjusted to approximate expected climate control settings. An A/C off test is also run for all drive profiles. This procedure measures approximate real-world A/C fuel use and assess the impact of thermal load reduction strategies.

Rugh, J. P.

2010-04-01T23:59:59.000Z

97

Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014  

SciTech Connect (OSTI)

The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

Alan Giesbrecht

2014-05-01T23:59:59.000Z

98

2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

99

2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

100

Alternative Fuel Evaluation Program: Alternative Fuel Light Duty Vehicle Project - Data collection responsibilities, techniques, and test procedures  

SciTech Connect (OSTI)

This report describes the data gathering and analysis procedures that support the US Department of Energy`s implementation of the Alternative Motor Fuels Act (AMFA) of 1988. Specifically, test procedures, analytical methods, and data protocols are covered. The aim of these collection and analysis efforts, as mandated by AMFA, is to demonstrate the environmental, economic, and performance characteristics of alternative transportation fuels.

none,

1992-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

105KE Basin Area Radiation Monitor System (ARMS) Acceptance Test Procedure  

SciTech Connect (OSTI)

This procedure is intended for the Area Radiation Monitoring System, ARMS, that is replacing the existing Programmable Input-Output Processing System, PIOPS, radiation monitoring system in the 105KE basin. The new system will be referred to as the 105KE ARMS, 105KE Area Radiation Monitoring System. This ATP will ensure calibration integrity of the 105KE radiation detector loops. Also, this ATP will test and document the display, printing, alarm output, alarm acknowledgement, upscale check, and security functions. This ATP test is to be performed after completion of the 105KE ARMS installation. The alarm outputs of the 105KE ARMS will be connected to the basin detector alarms, basin annunciator system, and security Alarm Monitoring System, AMS, located in the 200 area Central Alarm Station (CAS).

KINKEL, C.C.

1999-12-14T23:59:59.000Z

102

Disinfection Procedure for Water Distribution Pipelines Drinking water contamination can be prevented by hydrostatic testing and disinfection of  

E-Print Network [OSTI]

Disinfection Procedure for Water Distribution Pipelines Drinking water contamination can pipeline connections to the system, and respond to requests for drinking water assessments. And, any be prevented by hydrostatic testing and disinfection of potable water distribution pipelines before connecting

de Lijser, Peter

103

The evaluation of micro-surfacing mixture design procedures and the effects of material variation on the test responses  

E-Print Network [OSTI]

sand paper. c. 100 grit silicon carbide 'Carborundum' brand sand paper. d. Load cell to periodically check the cohesion meter pressure. 12 Sample Preparation and Testing Procedure Aggregate falling within the Texas Department of Transportation (Tx...

Andrews, Edward Mensah

1994-01-01T23:59:59.000Z

104

ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule  

Broader source: Energy.gov [DOE]

Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

105

Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint  

SciTech Connect (OSTI)

Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

2012-03-01T23:59:59.000Z

106

Drilling, completion, stimulation, and testing of Hardy HW[number sign]1 well, Putnam County, West Virginia  

SciTech Connect (OSTI)

This report discusses the detailed field operations in drilling, logging, casing, completing, stimulating and testing the Hardy HW No. l well located in Union District, Putnam County, West Virginia. The project was designed and managed by BDM in cooperation with Cabot Oil and Gas Corporation. The well was spudded on November 29, 1989 and was completed at a total measured depth of 6406 feet on December 29, 1989. The well was drilled on an average azimuth of 335 degrees with a total horizontal displacement of 2618 feet. Approximately 1035 feet of the well had an inclination higher than 86 degrees, while 2212 feet of the well had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Four zones were stimulated during three stimulation operations (Zones 3 and 4 were stimulated together). Zone 1 stimulation was a successful foam frac while the stimulations on Zones 2, 3-4 were Partially successful. Initial gas production rates were 4.5 times greater than the natural production rate. After 21 months, gas produced from the BDM/Cabot well has declined at a rate about one-half that of a conventional vertical well in the area. This horizontal well is projected to produce 475 million cubic feet of gas over a 30-year period.

Overbey, W.K. Jr.; Carden, R.S.; Locke, C.D.; Salamy, S.P.

1992-03-01T23:59:59.000Z

107

Drilling, completion, stimulation, and testing of Hardy HW{number_sign}1 well, Putnam County, West Virginia. Final report  

SciTech Connect (OSTI)

This report discusses the detailed field operations in drilling, logging, casing, completing, stimulating and testing the Hardy HW No. l well located in Union District, Putnam County, West Virginia. The project was designed and managed by BDM in cooperation with Cabot Oil and Gas Corporation. The well was spudded on November 29, 1989 and was completed at a total measured depth of 6406 feet on December 29, 1989. The well was drilled on an average azimuth of 335 degrees with a total horizontal displacement of 2618 feet. Approximately 1035 feet of the well had an inclination higher than 86 degrees, while 2212 feet of the well had an inclination greater than 62 degrees. The well was partitioned into five zones for stimulation purposes. Four zones were stimulated during three stimulation operations (Zones 3 and 4 were stimulated together). Zone 1 stimulation was a successful foam frac while the stimulations on Zones 2, 3-4 were Partially successful. Initial gas production rates were 4.5 times greater than the natural production rate. After 21 months, gas produced from the BDM/Cabot well has declined at a rate about one-half that of a conventional vertical well in the area. This horizontal well is projected to produce 475 million cubic feet of gas over a 30-year period.

Overbey, W.K. Jr.; Carden, R.S.; Locke, C.D.; Salamy, S.P.

1992-03-01T23:59:59.000Z

108

Cone penetrometer acceptance test report  

SciTech Connect (OSTI)

This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

Boechler, G.N.

1996-09-19T23:59:59.000Z

109

Test plan for composting studies involving weight and volume reduction of leaf and stalk biomass: DOE/OTD TTP{number_sign} SR17SS53 {ampersand} TTP{number_sign} SR18SS41  

SciTech Connect (OSTI)

SRTC and a panel of experts from off-site previously determined that composting was the most attractive alternative for reducing the volume and weight of biomass that was slightly radioactive. The SRTC proposed scope of work for Subtask 2 of TTP{number_sign} SR17SS53 and TTP{number_sign} SR18SS41 involves bench scale studies to assess the rates and efficiencies of various composting schemes for volume and weight reduction of leaf and stalk biomass (SB). Ultimately, the data will be used to design a composting process for biomass proposed by MSE for phytoremediation studies at SRS. This could drastically reduce costs for transporting and disposing of contaminated biomass resulting from a future major phytoremediation effort for soil clean-up at the site. The composting studies at SRTC includes collaboration with personnel from the University of Georgia, who will conduct chemical analyses of the plant material after harvest, pre-treatment, and composting for specific time periods. Parameters to be measured will include: lignin, hemicellulose, cellulose, carbon and nitrogen. The overall objective of this project is to identify or develop: (1) an inexpensive source of inoculum (consisting of nutrients and/or microorganisms) capable of significantly enhancing biomass degradation, (2) an optimum range of operating parameters for the composting process, and (3) a process design for the solid state degradation of lignocellulosic biomass contaminated with radionuclides that is superior to existing alternatives for dealing with such waste.

Wilde, E.W.; Kastner, J.; Murphy, C.; Santo Domingo, J.

1997-05-28T23:59:59.000Z

110

Functional test procedure, Fifth Wheel: SS-R42351, Issue D  

SciTech Connect (OSTI)

This report describes the equipment required for initial assembly/maintenance and inspection/resetting of the Fifth Wheel system. It also gives a step-by-step procedure for initial assembly/maintenance inspection and procedures for resetting the system and Eager-Pac installation. The Fifth Wheel system is associated with a tractor-type vehicle used for materials handling.

NONE

1994-07-12T23:59:59.000Z

111

New test procedure evaluates quality and accuracy of energy analysis tools for the residential building retrofit market.  

E-Print Network [OSTI]

New test procedure evaluates quality and accuracy of energy analysis tools for the residential that calculate optimal packages of efficiency measures. To improve the accuracy of energy analysis building retrofit market. Reducing the energy use of existing homes in the United States offers significant

112

aimer: This guideline is designed primarily as an educational resource for clinicians to help them provide quality medical care It should not be considered inclusive of all proper procedures and tests or exclusive of other procedures and tests that are re  

E-Print Network [OSTI]

provide quality medical care It should not be considered inclusive of all proper procedures and tests or exclusive of other procedures and tests that are reasonably directed to obtaining the same results the propriety of any specific procedure or test, the clinician should apply his or her own professional judgment

Levin, Judith G.

113

Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint  

SciTech Connect (OSTI)

A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

Rugh, J.

2010-02-01T23:59:59.000Z

114

Conceptualizing and testing random indirect effects and moderated mediation in multilevel models: New procedures and recommendations  

E-Print Network [OSTI]

The authors propose new procedures for evaluating direct, indirect, and total effects in multilevel models when all relevant variables are measured at Level 1 and all effects are random. Formulas are provided for the mean ...

Bauer, D. J.; Preacher, K. J.; Gil, Karen M.

2006-01-01T23:59:59.000Z

115

An Updated Procedure for Tare and Interference Wind Tunnel Testing of Strut-Mounted Models  

E-Print Network [OSTI]

to the presence of wind tunnel walls. The standard correction procedure adjusts for the presence of these boundaries using approximations based on linear potential flow theory. Separately,tare and interference removal involves the linear subtraction of mounting...

Kutz, Douglas M

2014-05-02T23:59:59.000Z

116

Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications  

SciTech Connect (OSTI)

The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

2011-06-01T23:59:59.000Z

117

A Functional Test Procedure for the improved commissioning of a VAV system  

E-Print Network [OSTI]

by logically sequencing the operations according to the following order: 1) test in manual (ie not controlled by the BEMS) operation 2) test in manual (ie not controlled by the BEMS) stop 3) test in normal operation 4) test at maximum flowrate 5) test...

Andre, P.; Lacote, P.; Aparecida Silva, C.; Hannay, J.; Lebrun, J.

2004-01-01T23:59:59.000Z

118

E-Print Network 3.0 - alternative test procedures Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Information Sciences 35 Power-Aware Test Planning in the Early System-on-Chip Design Exploration Process Summary: that, by exploring different design and test alternatives,...

119

DOE/NBS (Department of Energy/National Bureau of Standards) forum on testing and rating procedures for consumer products, October 2-3, 1985. Final report  

SciTech Connect (OSTI)

One hundred thirty-four persons participated in a Forum on Testing and Rating Procedures for Consumer Products held at the National Bureau of Standards (NBS), Gaithersburg, Maryland, on October 2-3, 1985. The objectives of the forum, planned in cooperation with various industry associations, were: (1) to provide a line of communication between test procedure users and test-procedure developers; (2) to provide an opportunity for participants to present technical and research issues concerning Department of Energy (DOE) test procedures that need to be addressed; and (3) to assist DOE and NBS in establishing a future agenda for the development and/or revision of testing and rating procedures. The report summarizes discussions, conclusions and recommendations developed by the forum participants for the following consumer products: heat pumps and air conditioners; furnaces, boilers, and household heaters; water heaters; refrigerators, refrigerator-freezers and freezers.

Dikkers, R.D.

1986-07-01T23:59:59.000Z

120

2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps;  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 HouseCovered ConsumerProcedures for

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 HouseCovered ConsumerProcedures forAvailability |

122

2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 HouseCovered ConsumerProcedures forAvailability

123

OPERATING PROCEDURES TO IMPLEMENT THE COLLEGE OF CHARLESTON POLICY ON ALCOHOL AND ILLICIT DRUG TESTING  

E-Print Network [OSTI]

for developing the annual list of employee positions that will be subject to such testing. (a) Not later than May Positions. (b) The DER and the Director shall evaluate the lists provided to determine if each designated AND ILLICIT DRUG TESTING THE LANGUAGE USED IN THIS DOCUMENT DOES NOT CREATE AN EMPLOYMENT CONTRACT BETWEEN

Kasman, Alex

124

2014-10-14 Issuance: Test Procedures and Energy Conservation Standards for Residential Solar Water Heaters; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

125

2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

126

2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register Supplemental Notice of Proposed Rulemaking regarding Test Procedures for Integrated Light-Emitting Diode Lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

127

2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

128

Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes  

SciTech Connect (OSTI)

This supporting document provides a detailed process to test the functions of the circuit switcher, protective relays, alarms, SCADA and 125VDC control logic of 115kV and 13.8kV systems at B3S4 substation following the removal of trip and blocking schemes to Transformer No.1 Circuit Switcher B594.

HACHE, J.M.

1999-08-25T23:59:59.000Z

129

Iterative procedure for in-situ EUV optical testing with an incoherent source  

SciTech Connect (OSTI)

We propose an iterative method for in-situ optical testing under partially coherent illumination that relies on the rapid computation of aerial images. In this method a known pattern is imaged with the test optic at several planes through focus. A model is created that iterates through possible aberration maps until the through-focus series of aerial images matches the experimental result. The computation time of calculating the through-focus series is significantly reduced by a-SOCS, an adapted form of the Sum Of Coherent Systems (SOCS) decomposition. In this method, the Hopkins formulation is described by an operator S which maps the space of pupil aberrations to the space of aerial images. This operator is well approximated by a truncated sum of its spectral components.

Miyawaka, Ryan; Naulleau, Patrick; Zakhor, Avideh

2009-12-01T23:59:59.000Z

130

2014-03-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for packaged terminal air conditioners and packaged terminal heat pumps, as issued by the Deputy Assistant Secretary on March 6, 2014.

131

Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs  

E-Print Network [OSTI]

Appliance Manufacturers (AHAM), and Japan’s own JIS C 9606The U.S. test procedure (AHAM HWL-1) does not include a washAppliance Manufacturers (AHAM) HWL-1 Cold Water: 60 ± 5?F (

Fridley, David

2010-01-01T23:59:59.000Z

132

Operational test report for LERF Basin 242AL-44 integrity test  

SciTech Connect (OSTI)

This operational test report documents the results of LERF operational testing per operational test procedure (OTP) TFPE-WP-0231, ``LERF Basin Integrity Testing.`` The primary purpose of the OTP was to resolve test exceptions generated as a result of TFPE-WP-0184. The TOP was prepared and performed in accordance with WHC-SD-534-OTP-002, ``Operational Test Plan for the 242-A Evaporator Upgrades and the Liquid Effluent Retention Facility.`` WHC-S-086, ``Specification for Operational Testing of the Liquid Effluent Retention Facility, Basin Integrity Testing,`` identified the test requirements and acceptance criteria. The completed, signed-off test procedure is contained in Appendix A. The test log is contained in Appendix B. Section 2.1 describes all the test exceptions written during performance of the Operational Test Procedure. The test revisions generated during the testing are discussed in Section 2.2. The dispositioned test exception forms are contained in Appendix C.

Galioto, T.M.

1994-11-08T23:59:59.000Z

133

An evaluation of guide signing at right multilane freeway exits with optional lanes  

E-Print Network [OSTI]

of this research found that guide signing treatments are different between and within many states. The Texas Manual on Uniform Traffic Control Devices explicitly recommends signs for multilane exits. This research tested guide signing alternatives to better...

Somers, Richard Andrew

1995-01-01T23:59:59.000Z

134

Every sign of life  

E-Print Network [OSTI]

Every Sign of Life introduces an approach to and motivational schema for personal health monitoring. It is an exploration of how to make information collected by personal health-monitoring devices fun and engaging, and ...

Gerasimov, Vadim, 1969-

2003-01-01T23:59:59.000Z

135

Observer error in identifying species using indirect signs: analysis of a river otter track survey technique  

E-Print Network [OSTI]

procedure, participants misidentified the tracks of 12 species as otter. Inaccurate identification of indirect signs is a likely source of error in wildlife studies. I recommend that observer skill in identification of indirect signs be measured in order...

Evans, Jonah Wy

2007-09-17T23:59:59.000Z

136

Application of EPA quality assurance procedures to a soil characterization study at the DOE Nevada Test Site  

SciTech Connect (OSTI)

The transfer, modification, and application of well formulated and tested quality assurance (QA) procedures from one project to another deserves consideration. The use of a proven QA program design could result in cost savings and the collection of data with a greater degree of confidence. To test this thesis, a QA program, originally developed for large nationwide Environmental Protection Agency (EPA) programs, was adapted and implemented in a site characterization study at the Department of Energy (DOE) Nevada Test Site to ensure that laboratory data satisfied pre-determined measurement quality objectives (MQOs). The QA Program was adapted from EPA programs such as the National Acid Precipitation Assessment Program, the Environmental Monitoring and Assessment Program, and to a lesser degree, the Comprehensive Environmental Recovery, Compensation and Liability Act (CERCLA) Program. The QA design adopted the batch or lot concept, in which samples are organized into groups of quality samples (non-blinds, blinds, and double-blinds), which were included in each batch to evaluate and control measurement uncertainty and to address sample preparation. Detectability was assessed using instrument detection limits and precision data for low-concentration samples. Precision was assessed using data from reference samples under a two-tiered system based on concentration ranges. Accuracy was investigated in terms of bias with respect to reference values. The results showed that QA concepts developed for previous nationwide EPA programs were successfully adapted for the site-specific DOE project.

Snyder, K.E.; Byers, G.E.; Van Remortel, R.D. [Lockheed-Martin Environmental Systems and Technologies Co., Las Vegas, NV (United States); Gustafson, D.L. [Raytheon Services Nevada, Las Vegas, NV (United States)

1995-12-01T23:59:59.000Z

137

A Discussion of Procedures and Equipment for the Comprehensive Test Ban Treaty On-Site Inspection Environmental Sampling and Analysis  

SciTech Connect (OSTI)

This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of the sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.

Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.; Seifert, Carolyn E.; Friese, Judah I.; Miley, Harry S.; Bowyer, Ted W.; Hanlen, Richard C.; Onishi, Yasuo; Hayes, James C.; Wigmosta, Mark S.

2011-02-01T23:59:59.000Z

138

Designing radiation protection signs  

SciTech Connect (OSTI)

Entry into hazardous areas without the proper protective equipment is extremely dangerous and must be prevented whenever possible. Current postings of radiological hazards at the Rocky Flats Environmental Technology Site (RFETS) do not incorporate recent findings concerning effective warning presentation. Warning information should be highly visible, quickly, and easily understood. While continuing to comply with industry standards (e.g., Department of Energy (DOE) guidelines), these findings can be incorporated into existing radiological sign design, making them more effective in terms of usability and compliance. Suggestions are provided for designing more effective postings within stated guidelines.

Rodriguez, M.A.; Richey, C.L.

1995-03-01T23:59:59.000Z

139

Using finite element analysis of retroreflective raised pavement markers to recommend testing procedures for simulating their field performance  

E-Print Network [OSTI]

procedures that can better simulate field conditions. This requires identifying critical locations and magnitudes of stresses inside the markers during the tire-marker impacts that happen on roads. The goal of this research was to identify critical magnitudes...

Agrawal, Ravi Prakash

2006-08-16T23:59:59.000Z

140

Operability test report for rotary mode core sampling system number 3  

SciTech Connect (OSTI)

This report documents the successful completion of operability testing for the Rotary Mode Core Sampling (RMCS) system {number_sign}3. The Report includes the test procedure (WHC-SD-WM-OTP-174), exception resolutions, data sheets, and a test report summary.

Corbett, J.E.

1996-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Isolation Procedures for Farrowing Operations  

E-Print Network [OSTI]

always isolate and test them (even though no single blood test is 100 percent accurate for many disease-causing organisms). When clinical disease signs such as diar- rhea, vomiting, high fever, persistent coughing or death occur, consult a veterinarian...

Lawhorn, D. Bruce

2002-01-31T23:59:59.000Z

142

Snamprogetti signs MTBE contracts  

SciTech Connect (OSTI)

Snamprogetti (Milan) will use a Russian-developed dehydrogenation process in a world-scale methyl tert-butyl ether (MTBE) plant it is to build at Arzew, Algeria for a previously announced joint venture of Sonatrach (Algiers), Total (Paris), and Ecofuel (Milan). The 600,000-m.t./year plant will be the first in the West to use the improved Snamprogetti-Yarsintez fluidized-bed dehydrogenation (FBD) technology proven on a demonstration plant at Yaroslavl, Russia. The process has also been selected for use in Oxyfuel Corp.`s 500,000-m.t./year MTBE plant near Beaumont, TX. Although the environmental permit is already in place, final agreement for this project has not yet been signed.

Alperowicz, N.

1992-04-15T23:59:59.000Z

143

2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking and public meeting regarding test procedures for refrigerated bottled or canned beverage vending machines, as issued by the Deputy Assistant Secretary for Energy Efficiency on August 1, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

144

Sign Up For Email Updates  

Broader source: Energy.gov [DOE]

Be the first to know of the latest developments from the Energy.gov team -- from videos to infographics to live Q&A’s -- by signing up for email updates.

145

TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM  

SciTech Connect (OSTI)

This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

WYRWAS RB; PAGE JS; COOKE GS

2012-04-19T23:59:59.000Z

146

Test procedures and protocols: Their relevance to the figure of merit for thermal distribution systems. Volume 1: Informal report  

SciTech Connect (OSTI)

A conceptual framework is developed that categorizes measurement protocols for forced-air thermal distribution systems in small buildings. This framework is based on the distinction between two generic approaches. The {open_quote}system-comparison{close_quote} approach seeks to determine, via a pair of whole-house energy-use measurements, the difference in energy use between the house with the as-found duct system and the same house with no energy losses attributable to the thermal distribution system. The {open_quote}component loss-factor{close_quote} approach identifies and measures the individual causes of duct losses, and then builds up a value for the net overall duct efficiency, usually with the help of computer simulation. Examples of each approach are analyzed and related to a proposed Figure of Merit for thermal distribution systems. This Figure of Merit would serve as the basis for a Standard Method of Test analogous to those already in place for furnaces, boilers, air conditioners, and heat pumps.

Andrews, J.W.

1993-09-01T23:59:59.000Z

147

Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test  

SciTech Connect (OSTI)

The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

Wang, Jy-An John [ORNL; Tan, Ting [ORNL; Jiang, Hao [ORNL; Zhang, Wei [ORNL; Feng, Zhili [ORNL

2012-10-01T23:59:59.000Z

148

NERSC Signs Supercomputing Agreement with Cray  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Signs Supercomputing Agreement with Cray NERSC Signs Supercomputing Agreement with Cray June 27, 2012 NERSC Contact: Linda Vu, lvu@lbl.gov, +1 510 495 2402 Cray Media: Nick Davis...

149

Unions, LANL sign labor agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlong version)Underground NaturalUnions, LANL sign labor

150

Surrounding Denver Metro Smart Sign Study  

E-Print Network [OSTI]

and the City of Boulder Over the course of the 2000 summer, the smart sign measured over 200,000 vehiclesSurrounding Denver Metro Smart Sign Study Summer 2000 Sponsored by the Regional Air Quality Council emissions (see figure below). The SMART SIGN uses an RSD 3000 detection system so all HC data in this report

Denver, University of

151

STATE OF CALIFORNIA CERTIFICATE OF COMPLIANCE, SIGN LIGHTING  

E-Print Network [OSTI]

STATE OF CALIFORNIA CERTIFICATE OF COMPLIANCE, SIGN LIGHTING CEC-SLTG-1C (Revised 10/10) CALIFORNIA Lighting) (Page 1 of 4) SLTG-1C Project Name: Date: Project Address: Location of Sign Phase of Sign Construction Type of Lighting Control Outdoor Signs New Signs New Lighting Controls Indoor Signs Sign

152

Mobile Energy Laboratory Procedures  

SciTech Connect (OSTI)

Pacific Northwest Laboratory (PNL) has been tasked to plan and implement a framework for measuring and analyzing the efficiency of on-site energy conversion, distribution, and end-use application on federal facilities as part of its overall technical support to the US Department of Energy (DOE) Federal Energy Management Program (FEMP). The Mobile Energy Laboratory (MEL) Procedures establish guidelines for specific activities performed by PNL staff. PNL provided sophisticated energy monitoring, auditing, and analysis equipment for on-site evaluation of energy use efficiency. Specially trained engineers and technicians were provided to conduct tests in a safe and efficient manner with the assistance of host facility staff and contractors. Reports were produced to describe test procedures, results, and suggested courses of action. These reports may be used to justify changes in operating procedures, maintenance efforts, system designs, or energy-using equipment. The MEL capabilities can subsequently be used to assess the results of energy conservation projects. These procedures recognize the need for centralized NM administration, test procedure development, operator training, and technical oversight. This need is evidenced by increasing requests fbr MEL use and the economies available by having trained, full-time MEL operators and near continuous MEL operation. DOE will assign new equipment and upgrade existing equipment as new capabilities are developed. The equipment and trained technicians will be made available to federal agencies that provide funding for the direct costs associated with MEL use.

Armstrong, P.R.; Batishko, C.R.; Dittmer, A.L.; Hadley, D.L.; Stoops, J.L.

1993-09-01T23:59:59.000Z

153

EML procedures manual  

SciTech Connect (OSTI)

This manual contains the procedures that are used currently by the Environmental Measurements Laboratory of the US Department of Energy. In addition a number of analytical methods from other laboratories have been included. These were tested for reliability at the Battelle, Pacific Northwest Laboratory under contract with the Division of Biomedical and Environmental Research of the AEC. These methods are clearly distinguished. The manual is prepared in loose leaf form to facilitate revision of the procedures and inclusion of additional procedures or data sheets. Anyone receiving the manual through EML should receive this additional material automatically. The contents are as follows: (1) general; (2) sampling; (3) field measurements; (4) general analytical chemistry; (5) chemical procedures; (6) data section; (7) specifications.

Volchok, H.L.; de Planque, G. (eds.)

1982-01-01T23:59:59.000Z

154

“Playboy Bunny” Sign of Congestive Heart Failure  

E-Print Network [OSTI]

Bunny’’ Sign of Congestive Heart Failure Akira Hokama, MD*to evaluate congestive heart failure. We highlight ‘‘Playboycaused by congestive heart failure. [West J Emerg Med. 2011;

Hokama, Akira; Arakaki, Shingo; Shibata, Daisuke; Maeshiro, Tatsuji; Kinjo, Fukunori; Fujita, Jiro

2011-01-01T23:59:59.000Z

155

The University of Winnipeg SIGNING OFFICERS  

E-Print Network [OSTI]

Principals Director of Purchasing Director, Institute of Urban Studies Senior Executive Officer and AdvisorThe University of Winnipeg SIGNING OFFICERS For purposes other than banking, including contracts over $25,000.00, any two of the following (or equivalent) are authorized to act as Signing Officers

Martin, Jeff

156

Fuel Efficiency Automobile Test Quality Assurance Narrative  

E-Print Network [OSTI]

Fuel Efficiency Automobile Test Quality Assurance Narrative Standard Operating Procedures Help ........................................................................................................... 3 FEAT Standard Operating Procedures...................................................................................................................24 Maintenance Items

Denver, University of

157

Slimhole Handbook- Procedures and Recommendations for Slimhole...  

Open Energy Info (EERE)

to library Report: Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and Testing in Geothermal Exploration Abstract No abstract prepared. Authors Jim...

158

Slimhole Handbook- Procedures And Recommendations For Slimhole...  

Open Energy Info (EERE)

Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration Jump to: navigation, search OpenEI Reference LibraryAdd to library Report:...

159

Additional Guidance Regarding Application of Current Procedures...  

Broader source: Energy.gov (indexed) [DOE]

Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010. Draft of DOE...

160

Limited Test Ban Treaty Signed | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011Liisa O'Neill About Us Liisa O'Neill

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

United States, Russia Sign Agreement to Further Research and...  

Broader source: Energy.gov (indexed) [DOE]

United States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security United States, Russia Sign Agreement to Further Research and...

162

DOE and the Bureau of Safety and Environmental Enforcement Sign...  

Broader source: Energy.gov (indexed) [DOE]

of Safety and Environmental Enforcement Sign Memorandum of Collaboration for Safe Offshore Energy Development DOE and the Bureau of Safety and Environmental Enforcement Sign...

163

DOE Signs Notice to Prepare Environmental Assessment on Proposed...  

Broader source: Energy.gov (indexed) [DOE]

DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany June 30,...

164

MOU signed between CIAE and Jefferson National Lab, USA. (China...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

www.jlab.orgnewsarticlesmou-signed-between-ciae-and-jefferson-national-lab-usa-china-nuclear-industry-news-ge... MOU signed between CIAE and Jefferson National Lab, USA....

165

United States and Ukraine Sign Agreement to Improve Security...  

Office of Environmental Management (EM)

Ukraine Sign Agreement to Improve Security of Ukraine's Radioactive Materials United States and Ukraine Sign Agreement to Improve Security of Ukraine's Radioactive Materials May...

166

United States and Japan Sign Joint Nuclear Energy Action Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

167

United States and Italy Sign Agreements to Advance Developments...  

Broader source: Energy.gov (indexed) [DOE]

Italy Sign Agreements to Advance Developments in Nuclear Energy United States and Italy Sign Agreements to Advance Developments in Nuclear Energy September 30, 2009 - 12:00am...

168

DOE Signing Paves the Way for Funding, Construction of Innovative...  

Energy Savers [EERE]

Signing Paves the Way for Funding, Construction of Innovative Clean Coal Plant in Florida DOE Signing Paves the Way for Funding, Construction of Innovative Clean Coal Plant in...

169

Delegation Procedures - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Delegation Procedures Text Delegation Procedures Delegation Template Text Redelegation Procedures Redelegation Template Delegation Procedures Redelegation Procedures...

170

Engineering Program Sign-up | 2014 Page 1 ENGINEERING PROGRAM SIGN-UP (EPS) SYSTEM  

E-Print Network [OSTI]

Engineering Program Sign-up | 2014 Page 1 ENGINEERING PROGRAM SIGN-UP (EPS) SYSTEM Students who the https://iac01.ucalgary.ca/EPS/ link from May 1 through May 30, 2014. If you are in the common in the EPS System. You need to do that even if you applied for a specific major program back when you first

Calgary, University of

171

[Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for locating exterior signsOP 61.22 [Minor revision­posted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure approval, a Project Request (Attachment B, OP 61.28) will be forwarded to Operations Division Maintenance

Rock, Chris

172

Use of a scenario-development procedure to identify potentially disruptive scenarios, Greater Confinement Disposal facility, Area 5, Nevada Test Site  

SciTech Connect (OSTI)

The Greater Confinement Disposal (GCD) facility includes four boreholes that contain transuranic (TRLT) waste. Presence of the TRU waste means that this facility must comply with the US Environmental Protection Agency`s Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Waste-Final Rule 40 CFR Part 191. To comply with the Containment Requirements of this rule, all potentially disruptive events and processes, and by implication all potentially disruptive combinations of events and processes (scenarios), must be identified for possible inclusion in performance assessments. Screening of the FEPs identified four events for scenario development: exploratory drilling for natural resources, drilling withdrawal wells, irrigation, and subsidence. Recent environmental-isotope analyses of the vadose zone suggest that radionuclide transport from the boreholes to the water table by infiltration is not a feasible transport mechanism within the time frame of regulatory concern. For this reason, the event of drilling withdrawal wells was merged with exploratory drilling for resources. The descriptions of the remaining three events were modified slightly to aid in estimation of event probabilities and consequence analyses. The three events are: exploratory drilling for resources penetrates a TRU borehole, irrigation occurs at the Radioactive Waste Management Site (RWMS), and subsidence occurs at the RWMS. Use of a logic diagram with these three events resulted in the construction of eight scenarios, including base-case (undisturbed) conditions. Screening these scenarios at this stage of scenario development was beyond the scope of this task. Based on the implementation assumptions, this scenario-development procedure produced a comprehensive set of mutually exclusive scenarios that are reproducible and auditable for use in GCD performance assessments.

Guzowski, R.V. [Science Applications International Corp., San Diego, CA (United States)]|[Sandia National Labs., Albuquerque, NM (United States). Safety and Risk Assessment Dept.

1994-12-31T23:59:59.000Z

173

Second order multidimensional sign-preserving remapping for ALE methods  

SciTech Connect (OSTI)

A second-order conservative sign-preserving remapping scheme for Arbitrary Lagrangian-Eulerian (ALE) methods is developed utilising concepts of the Multidimensional Positive Definite Advection Transport Algorithm (MPDATA). The algorithm is inherently multidimensional, and so does not introduce splitting errors. The remapping is implemented in a two-dimensional, finite element ALE solver employing staggered quadrilateral meshes. The MPDATA remapping uses a finite volume discretization developed for volume coordinates. It is applied for the remapping of density and internal energy arranged as cell centered, and velocity as nodal, dependent variables. In the paper, the advection of scalar fields is examined first for test cases with prescribed mesh movement. A direct comparison of MPDATA with the performance of the van Leer MUSCL scheme indicates advantages of a multidimensional approach. Furthermore, distinctly different performance between basic MPDATA and the infinite gauge option is illustrated using benchmarks involving transport of a sign changing velocity field. Further development extends the application of MPDATA remapping to the full ALE solver with a staggered mesh arrangement for density, internal energy and momentum using volume coordinates. At present, two options of the algorithm - basic and infinite gauge - are implemented. To ensure a meaningful assessment, an identical Lagrangian solver and computational mesh update routines are used with either MPDATA or van Leer MUSCL remapping. The evaluation places particular focus on the abilities of both schemes to accurately model multidimensional problems. Theoretical considerations are supported with numerical examples. In addition to the prescribed mesh movement cases for advection of scalars, the demonstrations include two-dimensional Eulerian and ALE flow simulations on quadrilateral meshes with both fixed and variable timestep control. The key comparisons include the standard test cases of Sod and Noh for single material problems. The results demonstrate that the MPDATA gauge option is suitable for providing accurate ALE remapping and preserves the multidimensionality and sign of both scalar and vector fields.

Hill, Ryan N [Los Alamos National Laboratory; Szmelter, J. [LOUGHBOROUGH UNIV.

2010-12-15T23:59:59.000Z

174

Motorist understanding of alternative construction work zone signing  

E-Print Network [OSTI]

of this report. Previous research has documented motorist misinterpretation of construction work zone signing. Two previous studies were used to identify the four study signs for this project. These four signs were: 1) The Advance Road Construction Sign, 2.... More than five hundred motorists were surveyed for this research project. An additional sample of twenty-five transportation professionals were surveyed to gain further insight on the current signs and their alternatives. The results were compared...

Ogden, Michael Anthony

1991-01-01T23:59:59.000Z

175

Contract and Procedure  

E-Print Network [OSTI]

This paper examines both the theoretical underpinnings and empirical picture of procedural contracts. Procedural contracts may be understood as contracts in which parties regulate not merely their commercial relations but also the procedures...

Drahozal, Christopher R.

2011-01-01T23:59:59.000Z

176

Student Policies & Procedures  

E-Print Network [OSTI]

Student Policies & Procedures summer.uci.edu #12;STUDENT POLICIES AND PROCEDURES Rev. 04/2014 1 ...................................................................................... 9 #12;STUDENT POLICIES AND PROCEDURES Rev. 04/2014 2 Who Summer Session Serves Current UCI Students

Barrett, Jeffrey A.

177

Zone methods and the fermion sign problem  

E-Print Network [OSTI]

We review a recently proposed approach to the problem of alternating signs for fermionic many body Monte Carlo simulations in finite temperature simulations. We derive an estimate for fermion wandering lengths and introduce the notion of permutation zones, special regions of the lattice where identical fermions may interchange and outside of which they may not. Using successively larger permutation zones, one can extrapolate to obtain thermodynamic observables in regimes where direct simulation is impossible.

Dean Lee

2002-09-03T23:59:59.000Z

178

Evaluation of alternative sign replacement strategies  

E-Print Network [OSTI]

replacement procedure at the time the new standards go into effect. This will ensure that material, manpower, and other expenditures are minimized, resulting in an overall benefit to TXDOT. Based on this review and analysis, it is recommended that TXDOT...

McCaleb, James Bradley

1996-01-01T23:59:59.000Z

179

U.S. and Russia Sign Plutonium Disposition Agreement | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline U.S. and Russia Sign Plutonium Disposition Agreement U.S. and Russia Sign Plutonium Disposition...

180

autoregulation dynamic sign: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

propose the site behind the ear as a location for an integrated wearable vital signs monitor. This location is ... He, David Da 182 Applications of Structural Balance in Signed...

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Secretary Bodman Signs Order to Help Restore Electricity to East...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Signs Order to Help Restore Electricity to East Texas More Quickly Secretary Bodman Signs Order to Help Restore Electricity to East Texas More Quickly September 28, 2005 - 10:58am...

182

UNIVERSITY OF NORTHERN BRITISH COLUMBIA Policies and Procedures  

E-Print Network [OSTI]

UNIVERSITY OF NORTHERN BRITISH COLUMBIA Policies and Procedures Finance President's Council Page to sign cheques on behalf of the University of Northern British Columbia are hereby authorized to make use and charge to the account of the University of Northern British Columbia all instruments purporting

Bolch, Tobias

183

Procedure for Performing PEM Single Cell Testing  

Broader source: Energy.gov [DOE]

Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

184

Current Test Procedure Waivers | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FY 2012 FY 2013 FY

185

Standards and Test Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe House Committee on Energy andDepartment ofAnShareAugust 15,

186

Test Procedure Waivers | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration atStandardsAnalysisof Energy Office

187

NPT Signed | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational Nuclearhas 'Natitude' | National NuclearAdministrator|News ReleasesSigned |

188

SciTech Connect: Sign In  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmitted for USMaterialstheterahertzonExplore by Subject ExploreSign In

189

Fair and optimistic quantum contract signing  

SciTech Connect (OSTI)

We present a fair and optimistic quantum-contract-signing protocol between two clients that requires no communication with the third trusted party during the exchange phase. We discuss its fairness and show that it is possible to design such a protocol for which the probability of a dishonest client to cheat becomes negligible and scales as N{sup -1/2}, where N is the number of messages exchanged between the clients. Our protocol is not based on the exchange of signed messages: Its fairness is based on the laws of quantum mechanics. Thus, it is abuse free, and the clients do not have to generate new keys for each message during the exchange phase. We discuss a real-life scenario when measurement errors and qubit-state corruption due to noisy channels and imperfect quantum memories occur and argue that for a real, good-enough measurement apparatus, transmission channels, and quantum memories, our protocol would still be fair. Apart from stable quantum memories, the other segments of our protocol could be implemented by today's technology, as they require in essence the same type of apparatus as the one needed for the Bennett-Brassard 1984 (BB84) cryptographic protocol. Finally, we briefly discuss two alternative versions of the protocol, one that uses only two states [based on the Bennett 1992 (B92) protocol] and the other that uses entangled pairs, and show that it is possible to generalize our protocol to an arbitrary number of clients.

Paunkovic, N.; Mateus, P. [SQIG - Instituto de Telecomunicacoes, IST, TULisbon, Avenida Rovisco Pais, P-1049-001 Lisbon (Portugal); Bouda, J. [Faculty of Informatics, Masaryk University, Botanicka 68a, CZ-60200 Brno (Czech Republic)

2011-12-15T23:59:59.000Z

190

Centralized maintenance procedures  

SciTech Connect (OSTI)

In 1989, shortly after Westinghouse Hanford Company (WHC) assumed maintenance responsibilities for the Hanford site, a Department of Energy (DOE) maintenance audit found that field (working level) maintenance procedures and procedure practices of the facilities scattered across Hanford`s 560 square miles varied as greatly as the locations of those facilities. In some of the audited facilities there were few or no procedures; in others, procedures conflicted with or were redundant to procedures at other facilities. This document presents current efforts to centralize maintenance procedures.

Barber, J.R.

1994-02-01T23:59:59.000Z

191

Computerized procedures system  

SciTech Connect (OSTI)

An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

Lipner, Melvin H. (Monroeville, PA); Mundy, Roger A. (North Huntingdon, PA); Franusich, Michael D. (Upper St. Clair, PA)

2010-10-12T23:59:59.000Z

192

The UC Davis Emerging Lithium Battery Test Project  

E-Print Network [OSTI]

35 degC to 150 degC 4. Test procedures The various cells anda consistent set of test procedures intended to determineapplications. The test procedures are summarized in Table 4.

Burke, Andy; Miller, Marshall

2009-01-01T23:59:59.000Z

193

Part 1, Use of seismic experience and test data to show ruggedness of equipment in nuclear power plants; Part 2, Review procedure to assess seismic ruggedness of cantilever bracket cable tray supports  

SciTech Connect (OSTI)

In December 1980, the US Nuclear Regulatory Commission (NRC) designated Seismic Qualification of Equipment in Operating Plants'' as an Unresolved Safety Issue (USI), A-46. The objective of USI A-46 is to develop alternative seismic qualification methods and acceptance criteria that can be used to assess the capability of mechanical and electrical equipment in operating nuclear power plants to perform the intended safety functions. A group of affected utilities formed the Seismic Qualification Utility Group (SQUG) to work with the NRC in developing a program methodology to enable resolution of the A-46 issue. To assist in developing a program methodology, SQUG and the NRC jointly selected and supported a five-member Senior Seismic Review and Advisory Panel (SSRAP) in June 1983 to make an independent assessment of whether certain classes of equipment in operating nuclear power plants in the United States have demonstrated sufficient ruggedness in past earthquakes so as to render an explicit seismic qualification unnecessary. SSRAP operated as an independent review body with all of its findings submitted concurrently to both SQUG and the NRC. During their period of involvement, SSRAP issued several draft reports on their conclusions. This document contains the final versions of these reports; namely, Use of Seismic Experience and Test Data to Show Ruggedness of Equipment in Nuclear Power Plants,'' dated February 1991 and Review Procedure to Assess Seismic Ruggedness of Cantilever Bracket Cable Tray Supports,'' dated March 1, 1991.

Kennedy, R.P. (Structural Mechanics Consulting, Inc., Yorba Linda, CA (United States)); von Riesemann, W.A. (Sandia National Labs., Albuquerque, NM (United States)); Wyllie, L.A. Jr. (Degenkolb (H.J.) Associates, San Francisco, CA (United States)); Schiff, A.J. (Stanford Univ., CA (United States)); Ibanez, P. (Anco Engineers, Inc., Culver City, CA (United States))

1992-06-01T23:59:59.000Z

194

Part 1, Use of seismic experience and test data to show ruggedness of equipment in nuclear power plants; Part 2, Review procedure to assess seismic ruggedness of cantilever bracket cable tray supports  

SciTech Connect (OSTI)

In December 1980, the US Nuclear Regulatory Commission (NRC) designated ``Seismic Qualification of Equipment in Operating Plants`` as an Unresolved Safety Issue (USI), A-46. The objective of USI A-46 is to develop alternative seismic qualification methods and acceptance criteria that can be used to assess the capability of mechanical and electrical equipment in operating nuclear power plants to perform the intended safety functions. A group of affected utilities formed the Seismic Qualification Utility Group (SQUG) to work with the NRC in developing a program methodology to enable resolution of the A-46 issue. To assist in developing a program methodology, SQUG and the NRC jointly selected and supported a five-member Senior Seismic Review and Advisory Panel (SSRAP) in June 1983 to make an independent assessment of whether certain classes of equipment in operating nuclear power plants in the United States have demonstrated sufficient ruggedness in past earthquakes so as to render an explicit seismic qualification unnecessary. SSRAP operated as an independent review body with all of its findings submitted concurrently to both SQUG and the NRC. During their period of involvement, SSRAP issued several draft reports on their conclusions. This document contains the final versions of these reports; namely, ``Use of Seismic Experience and Test Data to Show Ruggedness of Equipment in Nuclear Power Plants,`` dated February 1991 and ``Review Procedure to Assess Seismic Ruggedness of Cantilever Bracket Cable Tray Supports,`` dated March 1, 1991.

Kennedy, R.P. [Structural Mechanics Consulting, Inc., Yorba Linda, CA (United States); von Riesemann, W.A. [Sandia National Labs., Albuquerque, NM (United States); Wyllie, L.A. Jr. [Degenkolb (H.J.) Associates, San Francisco, CA (United States); Schiff, A.J. [Stanford Univ., CA (United States); Ibanez, P. [Anco Engineers, Inc., Culver City, CA (United States)

1992-06-01T23:59:59.000Z

195

Implementing MSE 2000: Procedures  

E-Print Network [OSTI]

do not spawn lasting procedures, and the advances achieved through crisis management are not sustained without formal procedures and an organizational commitment to continual improvement, efficiency gains made during an energy dilemma are quickly lost...

Brown, M.; Adams, J.

196

Federal Agency NEPA Procedures  

Broader source: Energy.gov [DOE]

Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

197

More refined enumerations of alternating sign matrices  

E-Print Network [OSTI]

We study a further refinement of the standard refined enumeration of alternating sign matrices (ASMs) according to their first two rows instead of just the first row, and more general "d-refined" enumerations of ASMs according to the first d rows. For the doubly-refined case of d=2, we derive a system of linear equations satisfied by the doubly-refined enumeration numbers A_{n,i,j} that enumerate such matrices. We give a conjectural explicit formula for A_{n,i,j} and formulate several other conjectures about the sufficiency of the linear equations to determine the A_{n,i,j}'s and about an extension of the linear equations to the general d-refined enumerations.

Ilse Fischer; Dan Romik

2009-04-15T23:59:59.000Z

198

Permutation zones and the fermion sign problem  

E-Print Network [OSTI]

We present a new approach to the problem of alternating signs for fermionic many body Monte Carlo simulations. We demonstrate that the exchange of identical fermions is typically short-ranged even when the underlying physics is dominated by long distance correlations. We show that the exchange process has a maximum characteristic range of sqrt[2*(1-f)*beta*h] lattice sites, where beta is the inverse temperature, h is the hopping parameter, and f is the filling fraction. We introduce the notion of permutation zones, special regions of the lattice where identical fermions may interchange and outside of which they may not. Using successively larger permutation zones, one can extrapolate to obtain thermodynamic observables in regimes where direct simulation is impossible.

Dean Lee

2002-10-22T23:59:59.000Z

199

Latest developments and application of DB Riley's low NOx CCV{reg{underscore}sign} burner technology  

SciTech Connect (OSTI)

Recent developments in DB Riley (DBR) low NOx burner technology and the application of this technology in coal fired utility boilers are discussed. Since the promulgation of the Clean Air Act Amendment in 1990, DBR has sold nearly 1,500 Controlled Combustion Venturi (CCV{reg{underscore}sign}) burners on pulverized coal fired utility boilers reducing NOx emissions 50--70% from uncontrolled levels. This technology has been retrofitted on boiler designs ranging in size and type from 50 MW front wall fired boilers to 1,300 MW opposed fired cell type boilers. In DBR's latest version of the CCV{reg{underscore}sign} burner, a second controlled flow air zone was added to enhance NOx control capability. Other developments included improved burner air flow measurement accuracy and several mechanical design upgrades such as new coal spreader designs for 3 year wear life. Test results of the CCV{reg{underscore}sign} dual air zone burner in DBR's 100 million Btu/hr (29 MW) coal burner test facility are presented. In the test program, coals from four utility boiler sites were fired to provide a range of coal properties. A baseline high volatile bituminous coal was also fired to provide a comparison with 1992 test data for the CCV{reg{underscore}sign} single register burner. The tests results showed that the second air zone enhanced NOx reduction capability by an additional 20% over the single register design. Computational fluid dynamic (DFD) modeling results of the CCV{reg{underscore}sign} dual air zone burner are also presented showing near field mixing patterns conducive to low NOx firing. DBR was recently awarded Phase IV of the Low Emission Boiler System (LEBS) program by the US Department of Energy to build a proof of concept facility representing the next major advancement in pulverized coal burning technology. A key part of winning that award were test results of the CCV{reg{underscore}sign} dual air zone burner with advanced air staging and coal reburning in a 100 million Btu/hr (20 MW) U-fired slagging combustor test facility. These results showed NOx emissions of less than 0.2 lb/million Btu (0.086 g/MJ) while converting the coal ash into an inert, non-leachable solid. This results is an 80% reduction in NOx emissions from currently operating U-fired slagging boilers.

Penterson, C.; Ake, T.

1998-07-01T23:59:59.000Z

200

Cable Measuring Engine Operation Procedures  

E-Print Network [OSTI]

MEASURING ENGINE OPERATION PROCEDURES LBNL-40565 SC-MAG-597MEASURING ENGINE OPERATION PROCEDURES INDEX IN T ROD U C TCALIBRATION PROCEDURE . .

Authors, Various

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

United States and Latvian Governments Sign Agreement to Allow...  

Office of Environmental Management (EM)

Raimonds Vejonis signed the agreement, which will provide for repatriation to Russia of SovietRussian-origin nuclear fuel from Latvia's shutdown research reactors at...

202

United States and France Sign Joint Statement on Civil Liability...  

Broader source: Energy.gov (indexed) [DOE]

Statement by U.S. Secretary of Energy, Ernest Moniz, and French Minister of Ecology, Sustainable Development, and Energy, Philippe Martin. "The signing of this joint statement...

203

President Ford Signs the Energy Reorganization Act of 1974 |...  

National Nuclear Security Administration (NNSA)

Ford Signs the Energy Reorganization Act of 1974 | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

204

Sandia National Laboratories: Inter-Agency Agreement Signed between...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Analysis Support Sandia Participated in AMII to Support American-Made Wind-Turbine Blades Inter-Agency Agreement Signed between DOE's Wind and Water Power Program and...

205

Composite molding of SPECTRA{reg_sign} extended chain polyethylene fibers in a flexible rubber matrix  

SciTech Connect (OSTI)

THETA Technologies, Inc. is a multidisciplinary research and development firm involved in the design and development of affordable, lightweight, high ballistic protection modular body armor ensemble for future military, law enforcement, and specialized commercial market applications. In the course of their research, THETA Technologies, Inc. identified that current state-of-the-art in ballistic protection and overall composite reinforcement is a high density extended chain polyethylene (HDECPE) fiber known as SPECTRA{reg_sign}, a product of AlliedSignal Fibers, Petersburg, VA. SPECTRA{reg_sign} is ten times stronger than steel of equal weight. As a non-aramid polyethylene, it offers highly desirable properties in areas of resistance to chemical degradation, virtual neutral buoyancy (0.97), and increased capacity for composite bonding over competing nylon-based fibers, such as KEVLAR{reg_sign}. SPECTRA Shield{trademark}, a woven ballistic-resistant fabric using the SPECTRA{reg_sign} fiber, is presently the most effective ballistic-resistant component for both flexible and hard plate composite armors. THETA Technologies, Inc. identified a market need for a boot sole design that would measurably increase protection to the wearer without significantly degrading performance in other areas, such as flexibility and overall weight. THETA Technologies, Inc. proposed a nitrile rubber and SPECTRA{reg_sign} fiber matrix to produce an optimal boot sole. The objective of this CRADA effort was to develop and test a process for combining the SPECTRA{reg_sign} fiber, in both chopped fiber and SPECTRA Shield{trademark} form, within a semiflexible nitrile composite having desirable and marketable properties in areas of resistance to penetration and mechanical stress.

McKeehan, K.

1997-08-01T23:59:59.000Z

206

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

207

Text Delegation Procedures  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

208

Teaching Physician Guidelines for Surgical Procedures Minor Surgical Procedures  

E-Print Network [OSTI]

Teaching Physician Guidelines for Surgical Procedures Minor Surgical Procedures: § Procedures, the teaching physician must be present for the entire procedure § Teaching physician or resident may document the teaching physician's presence for the entire procedure High Risk and Complex Surgical Procedures

Goldman, Steven A.

209

ACCIDENT PREVENTION SIGNS, TAGS, LABELS, SIGNALS, PIPING SYSTEM IDENTIFICATION AND  

E-Print Network [OSTI]

EM 385-1-1 XX Sep 13 i Section 8 ACCIDENT PREVENTION SIGNS, TAGS, LABELS, SIGNALS, PIPING SYSTEM............................................................8-13 Tables: 8-1 Accident Prevention Sign Requirements..........................8-17 8-2 Accident.......................................8-24 8-9 Accident Prevention Tags.............................................8-25 #12;EM 385-1-1 XX

US Army Corps of Engineers

210

Sign elements in symmetric groups Jrn B. Olsson  

E-Print Network [OSTI]

;Introduction Work in progress Question by G. Navarro about characters in symmetric groups, related to a paper characters · The Isaacs-Navarro question · Sign elements/classes in finite groups and their relation groups · Answering the Isaacs-Navarro question · A general result about sign classes in symmetric groups

Takahashi, Ryo

211

A stop-sign-recognition system for an autonomous land-vehicle  

E-Print Network [OSTI]

. Hall, "Automatic op- eration tor a robot lawn mower, " in Mobile Robots, SPIE, Vol. 727, Cambridge, MA, 1986, pp. 344-354. S. Ishikawa, H. Kuwamoto, and S. Ozawa, "Visual navigation ot' an autonomous vehicle using white line recognition, " IEEE... projection ot the movement ot the sign between frames is made, such that control between frames is main- tained. Because this system has not yet been installed or tested on BART, this thesis does not include actual video data; rather. it develops...

Bergenback, Bruce Edward

1989-01-01T23:59:59.000Z

212

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

E-Print Network [OSTI]

of AEPSC. DTC Registered Procedure CERTS Microgrid Test PlanTarget Group: Assigned Procedure Review Date: 23 Feb. 2008document is to establish procedures for testing of the CERTS

Eto, Joseph H.

2008-01-01T23:59:59.000Z

213

E-Print Network 3.0 - advanced components test facility Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of components for the new de- signs being tested underground at the Nevada Test Site. Small- scale recycling... Alam- os. Finally there was a modest capability to design,...

214

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

215

Procedures in Modules (1) Including all procedures within modules  

E-Print Network [OSTI]

Procedures in Modules (1) Including all procedures within modules works very well in almost all designing these if possible #12;Procedures in Modules (2) These are very much like internal procedures Works very well in almost all programs Everything accessible in the module can also be used in the procedure

216

Kentucky WRI Pilot Test Universal ID  

E-Print Network [OSTI]

Kentucky WRI Pilot Test ­ Universal ID Commercial Motor Vehicle Roadside Technology Corridor Safety Universal ID Pilot TestKentucky Pilot Test #12;Kentucky Pilot Test (Not to Scale) Sorter WIM USDOT Reader >>>> Park/Proceed Signs Mainline >>>> #12;Kentucky Pilot Test · Information is captured from the commercial

217

Quiz Policies and Procedures  

E-Print Network [OSTI]

Quiz Policies and Procedures. 1. Studying the lesson notes and completing most of the homework problems prior to class is the best way to prepare for a quiz. 2.

Bailey, Charlotte M

2014-08-19T23:59:59.000Z

218

Comparisons of field performance to closed-door test T ABLE 1 ratings indicate the laboratory procedure is a valid indica-Design Options to Improve the Energy Efficiency of a  

E-Print Network [OSTI]

be incorporated into the conventional RF design (a Option 8 High-efficiency fan motor single fan-forced evaporator heat load. Adaptive condensate at the door gaskets were estimated by ..zeroing defrost, efficient fan the laboratory procedure is a valid indica- Design Options to Improve the Energy Efficiency of a tion of energy

Oak Ridge National Laboratory

219

Statistical simulation procedures  

E-Print Network [OSTI]

. Ringer This thesis investicates methods for estimating statistical distribution functions which cannot be easily solved by theoretical techniques. The stratified Ilonte Carlo procedure of Ringer and Suharto [11j is extended to the multivariate case... and applied to two probIems, one practical, the other theoretical. This procedure Is shown to be more precise than simple Monte Carlo simula- t. i on. numerical method proposed by Soserville [12j is also extended to the multivariate case, and compared...

Tremelling, Robert Norman

2012-06-07T23:59:59.000Z

220

Regulations and Procedures Manual  

E-Print Network [OSTI]

Employees in Testing-Designated Positions (TDPs) Employeesare designated as a testing-designated position (TDP) areEmployees in Non-Testing-Designated Positions (TDPs) (a.k.a.

Young, Lydia J.

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

U.S. and Russia Sign Statement of Intent  

Broader source: Energy.gov [DOE]

Secretary Chu and Sergei Kiriyenko, Director General of Russia’s State Corporation for Atomic Energy (Rosatom), signed a Statement of Intent (SOI) concerning collaboration in innovative technologies for environmental restoration and radioactive waste management.

222

Signs and Polarized/Magnetic versions of the Casimir Forces  

E-Print Network [OSTI]

We consider versions of the Casimir effect where the force can be controlled by changing the angle between two Casimir ``plates'' or the temperature of two nearby rings. We also present simple arguments for the sign of Casimir forces.

S. Nussinov

1995-09-05T23:59:59.000Z

223

Nuclear Lattice Simulations using Symmetry-Sign Extrapolation  

E-Print Network [OSTI]

Projection Monte Carlo calculations of lattice Chiral Effective Field Theory suffer from sign oscillations to a varying degree dependent on the number of protons and neutrons. Hence, such studies have hitherto been concentrated on nuclei with equal numbers of protons and neutrons, and especially on the alpha nuclei where the sign oscillations are smallest. We now introduce the technique of "symmetry-sign extrapolation" which allows us to use the approximate Wigner SU(4) symmetry of the nuclear interaction to control the sign oscillations without introducing unknown systematic errors. We benchmark this method by calculating the ground-state energies of the $^{12}$C, $^6$He and $^6$Be nuclei, and discuss its potential for studies of neutron-rich halo nuclei and asymmetric nuclear matter.

Lähde, Timo A; Lee, Dean; Meißner, Ulf-G; Epelbaum, Evgeny; Krebs, Hermann; Rupak, Gautam

2015-01-01T23:59:59.000Z

224

Media Advisory: Jefferson Lab Signs Partnership Agreement With...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Date: Monday, Nov. 26, 2012 Time: The signing will take place at 2:30 p.m. Place: CEBAF Center at Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA 23606 Event:...

225

Cisco MOVI sign in Cisco MOVI UCSF Directory  

E-Print Network [OSTI]

Cisco MOVI sign in Cisco MOVI UCSF Directory CiscoMOVIQuickReferenceGuide Cisco MOVI Cisco MOVI in the MOVI UCSF Directory and clicking start if the user is online Accepting a Video Call A pop up window

Derisi, Joseph

226

United Arab Emirates and United States Sign MOU at Strategic...  

Energy Savers [EERE]

October 1, 2014 - 1:50pm Addthis Secretary Moniz and UAE Minister of Energy Suhail Al Mazrouei signed a Memorandum of Understanding that reaffirms their commitment to a...

227

Neural Systems Underlying Spatial Language in American Sign Language  

E-Print Network [OSTI]

describing spatial relations in ASL, the identity of each object is first indicated by a lexical sign (e.g., HOUSE, BIKE2 ). The location of the objects, their ori- entation, and their spatial relation vis

Bellugi, Ursula

228

Design and analysis of recycled content sign blanks  

E-Print Network [OSTI]

. In response, industries have developed composite materials made of recycled plastic, fiber-reinforced plastics, and alloys made of recycled aluminum. Two predoininantly reclaimed inaterials have been investigated for use as sign substrates. The first... in avoiding costs from tort actions. Aluminuin and wood are the substrates most frequently used for traffic signs. Grades 6061 (heat beatable) and 5052 (non-heat treatable) aluminum alloys are widely used. Currently, grade 3000 aluminum alloys, which...

Harrison, Ben Frank

1996-01-01T23:59:59.000Z

229

Alternative highway sign alphabet styles for older drivers  

E-Print Network [OSTI]

ALTERNATIVE HIGHWAY SIGN ALPHABET STYLES FOR OLDER DRIVERS A Thesis by Carol Hannah Tan Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May... (Member) Jame T. . Yao (Head of partment) May 1991 ABSTRACT Alternative Highway Sign Alphabet Styles for Older Drivers. (May 1991) Carol Hannah Tan, B. S. , Texas A8 M University Chair of Advisory Committee: Dr. Daniel B. Farnbro In the United...

Tan, Carol Hannah

1991-01-01T23:59:59.000Z

230

Evidence in European Asylum Procedures.  

E-Print Network [OSTI]

??This thesis explores the particular framework of evidentiary assessment of three selected appellate national asylum procedures in Europe and discusses the relationship between these procedures,… (more)

Staffans, Ida

2011-01-01T23:59:59.000Z

231

Emergency Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services Employee Services Safety and Health Emergency Procedures Emergency Procedures Note: This page is pending deletion, please refer to the Safety and health main page...

232

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

233

Cable Measuring Engine Operation Procedures  

E-Print Network [OSTI]

gov CABLE MEASURING ENGINE OPERATION PROCEDURES LBNL-40565LBNL-40565 CABLE MEASURING ENGINE OPERATION PROCEDURES INDEXThe Cable Measuring Engine (CME) is a tool which measures

Authors, Various

2011-01-01T23:59:59.000Z

234

Latest developments and application of DB Riley`s low NOx CCV{reg_sign} burner technology  

SciTech Connect (OSTI)

Recent developments in DB Riley (DBR) low NO{sub x} burner technology and the application of this technology in coal fired utility boilers are discussed. Since the promulgation of the Clean Air Act Amendment in 1990, DBR has sold nearly 1500 Controlled Combustion Venturi (CCV{reg_sign}) burners on pulverized coal fired utility boilers reducing NOx emissions 50 - 70% from uncontrolled levels. This technology has been retrofitted on boiler designs ranging in size and type from 50 MW front wall fired boilers to 1300 MW opposed fired cell type boilers. In DBR`s latest version of the CCV{reg_sign} burner, a second controlled flow air zone was added to enhance NO{sub x} control capability. Other developments included improved burner air flow measurement accuracy and several mechanical design upgrades such as new coal spreader designs for 3 year wear life. Test results of the CCV{reg_sign} dual air zone burner in DBR`s 100 million Btu/hr (29 MW) coal burner test facility are presented. In the test program, coals from four utility boiler sites were fired to provide a range of coal properties. A baseline high volatile bituminous coal was also fired to provide a comparison with 1992 test data for the CCV{reg_sign} single register burner. The test results showed that the second air zone enhanced NO{sub x} reduction capability by an additional 20% over the single register design. Computational fluid dynamic (CFD) modeling results of the CCV{reg_sign} dual air zone burner are also presented showing near field mixing patterns conducive to low NO{sub x} firing.

Penterson, C.; Ake, T. [DB Riley, Inc., Worcester, MA (United States)

1998-04-01T23:59:59.000Z

235

Entrance surface dose in cerebral interventional radiology procedures  

SciTech Connect (OSTI)

At the Instituto Nacional de Neurologia y Neurocirugia (INNN) diagnostic as well as therapeutic procedures of interventional radiology are carried out. Since the procedures can last from some minutes to several hours, the absorbed dose for the patient could increase dangerously. An investigation had begun in order to determine the entrance surface dose (ESD) using 25 thermoluminiscent dosimeters TLD-100 and 8 strips of 15 Multiplication-Sign 1 cm{sup 2} of Gafchromic XR-QA2 film bound in a holder of 15 Multiplication-Sign 15 cm{sup 2} in the posteroanterior (PA) and lateral (LAT) positions during all the procedure. The results show that maximum ESD could be from 0.9 to 2.9 Gy for the PA position and between 1.6 and 2.5 Gy for the lateral position. The average ESD was between 0.7 and 1.3 Gy for the PA position, and from 0.44 to 1.1 Gy for the lateral position in a therapeutic procedure.

Barrera-Rico, M.; Lopez-Rendon, X.; Rivera-Ordonez, C. E.; Gamboa-deBuen, I. [Instituto de Ciencias Nucleares, Universidad Nacional Autonoma de Mexico, 04510 DF (Mexico); Instituto Nacional de Neurologia y Neurocirugia Manuel Velasco Suarez, 14269 DF (Mexico); Instituto de Ciencias Nucleares, Universidad Nacional Autonoma de Mexico, 04510 DF (Mexico)

2012-10-23T23:59:59.000Z

236

The Psychology Clinic Manual of Procedures and  

E-Print Network [OSTI]

and Maintenance of Test Security 10.6 Obtaining Assessment Materials 10.7 Standard Assessment Protocol 10.8 CourseTEXAS TECH UNIVERSITY The Psychology Clinic Manual of Procedures and Requirements FALL 2013 Edition Statement 1.3 Faculty and Staff 1.4 Contact Information 1.5 Hours of Operation 1.6 Parking 1.7 Clinic

Zhang, Yuanlin

237

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

238

Waste Isolation Pilot Plant Salado hydrology program data report {number_sign}3  

SciTech Connect (OSTI)

WIPP Salado Hydrology Program Data Report {number_sign}3 presents hydrologic data collected during permeability testing, coupled permeability and hydrofracture testing, and gas-threshold-pressure testing of the Salado Formation performed from November 1991 through October 1995. Fluid-pressure monitoring data representing August 1989 through May 1995 are also included. The report presents data from the drilling and testing of three boreholes associated with the permeability testing program, nine boreholes associated with the coupled permeability and hydrofracture testing program, and three boreholes associated with the gas-threshold-pressure testing program. The purpose of the permeability testing program was to provide data with which to interpret the disturbed and undisturbed permeability and pore pressure characteristics of the different Salado Formation lithologies. The purpose of the coupled permeability and hydrofracture testing program was to provide data with which to characterize the occurrence, propagation, and direction of pressure induced fractures in the Salado Formation lithologies, especially MB139. The purpose of the gas-threshold-pressure testing program was to provide data with which to characterize the conditions under which pressurized gas displaces fluid in the brine-saturated Salado Formation lithologies. All of the holes were drilled from the WIPP underground facility 655 m below ground surface in the Salado Formation.

Chace, D.A.; Roberts, R.M.; Palmer, J.B.; Kloska, M.B.; Fort, M.D.; Martin, G.J.; Stensrud, W.A. [INTERA, Inc., Albuquerque, NM (United States)

1998-01-01T23:59:59.000Z

239

ACADEMIC PROGRAM PROCEDURE MANUAL  

E-Print Network [OSTI]

1 ACADEMIC PROGRAM REVIEW PROCEDURE MANUAL 2014-2015 Office of the Senior Vice President Tucson, AZ 85721 #12;2 ACADEMIC PROGRAM REVIEW MANAGEMENT TEAM Web Site for Academic Program Review http Educational Policy Studies & Practice Spanish and Portuguese Electrical & Computer Engineering Teaching

Fay, Noah

240

PHYSICAL PLANT POLICY & PROCEDURE  

E-Print Network [OSTI]

PHYSICAL PLANT POLICY & PROCEDURE TITLE PHYSICAL PLANT HIGH VOLTAGE PREVENTIVE MAINTENANCE OBJECTIVE AND PURPOSE To establish a consistent policy of performing Preventive Maintenance on high voltage by the G.S.A. Preventive Maintenance sections E- 29 (high voltage oil circuit breaker), E-32 (high voltage

Fernandez, Eduardo

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

HASL procedures manual  

SciTech Connect (OSTI)

Addition and corrections to the following sections of the HASL Procedures Manual are provided: Table of Contents; Bibliography; Fallout Collection Methods; Wet/Dry Fallout Collection; Fluoride in Soil and Sediment; Strontium-90; Natural Series; Alpha Emitters; and Gamma Emitters. (LK)

Not Available

1980-08-01T23:59:59.000Z

242

Building Programming List Procedures  

E-Print Network [OSTI]

1 6.090 Building Programming Experience Lecture 4 1/16/2007 Outline · List Procedures · Compound)) (define (reverse-helper l r) (if (null? l) r (reverse-helper (cdr l) (cons (car l) r)))) list-ref · Write

243

EMERGENCY PROCEDURES --2013 INFORMATION  

E-Print Network [OSTI]

quickly, remain calm. Take personal items (keys, purse, wallet, coat, shoes) Secure any hazardous procedures. SHOOTING INCIDENT If shooter is outside building: Turn off lights, lock windows and doors, close police. If shooter is inside the building: If safe to exit, flee. Call 9-1-1 to give location. Do

244

EMERGENCY PROCEDURES --2014 INFORMATION  

E-Print Network [OSTI]

hazardous materials. Close door when you exit. Go to evacuation assembly point designated by evacu- ation procedures. SHOOTING INCIDENT If shooter is outside building: Turn off lights, lock windows and doors, close of uniformed police. If shooter is inside the building: If safe to exit, flee. Call 9-1-1 to give location

245

Solderability test system  

DOE Patents [OSTI]

A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time. 11 figs.

Yost, F.; Hosking, F.M.; Jellison, J.L.; Short, B.; Giversen, T.; Reed, J.R.

1998-10-27T23:59:59.000Z

246

Solderability test system  

DOE Patents [OSTI]

A new test method to quantify capillary flow solderability on a printed wiring board surface finish. The test is based on solder flow from a pad onto narrow strips or lines. A test procedure and video image analysis technique were developed for conducting the test and evaluating the data. Feasibility tests revealed that the wetted distance was sensitive to the ratio of pad radius to line width (l/r), solder volume, and flux predry time.

Yost, Fred (Cedar Crest, NM); Hosking, Floyd M. (Albuquerque, NM); Jellison, James L. (Albuquerque, NM); Short, Bruce (Beverly, MA); Giversen, Terri (Beverly, MA); Reed, Jimmy R. (Austin, TX)

1998-01-01T23:59:59.000Z

247

Appendix A: STANDARD OPERATING PROCEDURES  

E-Print Network [OSTI]

1 Appendix A: STANDARD OPERATING PROCEDURES A. STANDARD OPERATING PROCEDURES Standard Operating Procedures (SOP) are written safety and health guidelines for laboratory work with hazardous chemicals Procedures be written for hazardous chemicals when the chemical is used routinely in the laboratory and when

Ferrara, Katherine W.

248

Pollutant Assessments Group Procedures Manual  

SciTech Connect (OSTI)

This procedures manual combines the existing procedures for radiological and chemical assessment of hazardous wastes used by the Pollutant Assessments Group at the time of manuscript completion (October 1, 1990). These procedures will be revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy and support procedures. Format inconsistencies will be corrected in subsequent revisions of individual procedures.

Chavarria, D.E.; Davidson, J.R.; Espegren, M.L.; Kearl, P.M.; Knott, R.R.; Pierce, G.A.; Retolaza, C.D.; Smuin, D.R.; Wilson, M.J.; Witt, D.A. (Oak Ridge National Lab., TN (USA)); Conklin, N.G.; Egidi, P.V.; Ertel, D.B.; Foster, D.S.; Krall, B.J.; Meredith, R.L.; Rice, J.A.; Roemer, E.K. (Oak Ridge Associated Universities, Inc., TN (USA))

1991-02-01T23:59:59.000Z

249

M:\\Security Reinstatement Procedures (Auto Lockout).sjm.09132011 HR Security Access Reinstatement  

E-Print Network [OSTI]

M:\\Security Reinstatement Procedures (Auto Lockout).sjm.09132011 HR Security Access Reinstatement section, indicate "restore access prior to lockout". Leave the bottom section (adding and removing roles sign the form for approval. 2. Print the lock-out email notification received from DoIT and attach

Adali, Tulay

250

M:\\Security Reinstatement Procedures (Auto Lockout).sjm.09132011 HR Security Access Reinstatement  

E-Print Network [OSTI]

M:\\Security Reinstatement Procedures (Auto Lockout).sjm.09132011 HR Security Access Reinstatement Profile section, indicate "restore access prior to lockout". Leave the bottom section (adding and removing authority sign the form for approval. 2. Print the lock-out email notification received from DoIT and attach

Adali, Tulay

251

Bethe roots and refined enumeration of alternating-sign matrices  

E-Print Network [OSTI]

The properties of the most probable ground state candidate for the XXZ spin chain with the anisotropy parameter equal to -1/2 and an odd number of sites is considered. Some linear combinations of the components of the considered state, divided by the maximal component, coincide with the elementary symmetric polynomials in the corresponding Bethe roots. It is proved that those polynomials are equal to the numbers providing the refined enumeration of the alternating-sign matrices of order M+1 divided by the total number of the alternating-sign matrices of order M, for the chain of length 2M+1.

A. V. Razumov; Yu. G. Stroganov

2006-05-12T23:59:59.000Z

252

Same-Sign Charginos And Majorana Neutralinos at the LHC  

SciTech Connect (OSTI)

We demonstrate the possibility of studying weakly interacting new particles in weak boson fusion, using the example of supersymmetric same-sign charginos. This signal can establish the existence of Majorana neutralinos and give access to their electroweak couplings. It can be observed over (supersymmetric) QCD backgrounds provided the charginos are light and not too close to the squark mass. We finally show how same-sign fermion production can be distinguished from samesign scalars or vectors arising in other models of new physics.

Alwall, Johan; /SLAC; Rainwater, Dave; /Rochester U.; Plehn, Tilman; /Edinburgh U.

2007-06-18T23:59:59.000Z

253

ARM - Publications Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC :ProductsSCM Forcing Data Derived fromgovPublicationsPublications Procedures

254

GAP TESTS; COMPARISON BETWEEN UN GAP TEST AND CARD GAP TEST  

E-Print Network [OSTI]

98-36 GAP TESTS; COMPARISON BETWEEN UN GAP TEST AND CARD GAP TEST by R. BRANKA and C. MICHOT, FRANCE (tel.: 33 3 44 55 65 19, fax: 33 3 44 55 65 10) ABSTRACT: UN gap test, type 1(a) or 2(a), is the recommended test in the acceptance procedure for transport of explosives in class 1. Up to the revision

Paris-Sud XI, Université de

255

Load test of the 277W Building high bay roof deck and support structure  

SciTech Connect (OSTI)

The 277W Building high bay roof area was load tested according to the approved load-test procedure, WHC-SD-GN-TP-30015, Revision 1. The 277W Building is located in the 200 West Area of the Hanford Site and has the following characteristics: roof deck -- wood decking supported by 4 x 14 timber purlins; roof membrane -- tar and gravel; roof slope -- flat (<10 deg); and roof elevation -- maximum height of about 63 ft. The 227W Building was visited in March 1994 for a visual inspection. During this inspection, cracked areas were visible in the decking, but it was not possible to determine whether these cracks extended completely through the decking, which is 2-in. thick. The building was revisited in March 1994 for the purpose of writing this test report. Because the roof requires personnel access, a test was determined to be the best way to qualify the roof. The conclusions are that the roof has been qualified for 500-lb total roof load and that the ``No Roof Access`` signs can be changed to ``Roof Access Restricted`` signs.

McCoy, R.M.

1994-12-02T23:59:59.000Z

256

CRITIQUING TEAM PROCEDURE EXECUTION Stephanie Guerlain Peter Bullemer  

E-Print Network [OSTI]

this and other refinery tasks. This project aimed to develop and test an on-line, interactive procedure system at a major petrochemical refinery. This refinery hastwo identical reactors in one part of their process

Virginia, University of

257

AIMMP signs TTAP MOU The Association of Wood and  

E-Print Network [OSTI]

verified timber. We currently advise and provide technical support to timber companies based in Asia,000 cubic meters of logs and 88,200 cubic meters of sawn timber making Portugal the fifth largest importer of tropical timber in the EU. Signing this MOU with TFT is a strategic move for our organisa- tion to help

258

Texas driver comprehension of abbreviations for changeable message signs  

E-Print Network [OSTI]

The research conducted for this thesis was done as part of an ongoing research project by the Texas Transportation Institute (TTI) for the Texas Department of Transportation (TxDOT) for the evaluation of changeable message sign (CMS) use in Texas...

Durkop, Brooke Rae

2012-06-07T23:59:59.000Z

259

IM Free Agent Sign Up 1 Wanted! Intramurals Free Agents!  

E-Print Network [OSTI]

IM Free Agent Sign Up 1 Wanted! Intramurals Free Agents! Individuals who do not have a full team a "Free Agent". Within the UNLV Intramural Sports program there are multiple ways to improve a Free Agent will not force any team to accept a Free Agent participant. History and research has shown that Free Agents

Hemmers, Oliver

260

The Complexity of Weighted Boolean #CSP with Mixed Signs  

E-Print Network [OSTI]

The Complexity of Weighted Boolean #CSP with Mixed Signs Andrei Bulatova , Martin Dyerb , Leslie constraint satisfaction problem (CSP), which corresponds to the case where all functions in have range {0, 1}. The problem we consider here is to compute the partition function of a given instance of weighted CSP; that is

Bulatov, Andrei

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Evidence for an anomalous like-sign dimuon charge asymmetry  

SciTech Connect (OSTI)

We measure the charge asymmetry A of like-sign dimuon events in 6.1 fb{sup -1} of p{bar p} collisions recorded with the DO detector at a center of mass energy sqrt s = 1.96 TeV at the Fermilab Tevatron Collider.

Abazov, Victor Mukhamedovich; /Dubna, JINR; Abbott, Braden Keim; /Oklahoma U.; Abolins, Maris A.; /Michigan State U.; Acharya, Bannanje Sripath; /Tata Inst.; Adams, Mark Raymond; /Illinois U., Chicago; Adams, Todd; /Florida State U.; Aguilo, Ernest; /York U., Canada; Alexeev, Guennadi D.; /Dubna, JINR; Alkhazov, Georgiy D.; /St. Petersburg, INP; Alton, Andrew K.; /Michigan U. /Augustana Coll., Sioux Falls; Alverson, George O.; /Northeastern U. /Rio de Janeiro, CBPF

2010-05-01T23:59:59.000Z

262

Multi-party contract signing: a roller-coaster ride  

E-Print Network [OSTI]

T may overturn its abort decision, but never overturns a resolve decision #12;GM protocol problems T to collect and distribute the signed contracts Problem: T may become a bottleneck. Optimistic protocols Two proof that all parties have issued a promise T can issue an abort token 2-party: means

Ryan, Mark

263

Test Authorization Form DSS Testing Office 0118 Shoemaker University of Maryland, College Park 20742  

E-Print Network [OSTI]

Test Authorization Form DSS Testing Office 0118 Shoemaker University of Maryland, College Park) _______________________________________ *** Instructor and Student should decide upon mutually agreeable date and time. Online Test Request (a and signed by instructor or TA. This form must accompany each exam. Test may be faxed (301.314.9478), emailed

Li, Teng

264

Energy Metering Audit Procedure  

E-Print Network [OSTI]

Energy Meterilg Audtt Procedure Wiliam S Whitaker Engineering Specialist T X E INC. laPorte Texas INTROOUCI'ION This paper describes the recent audit of the utility distriooticn meters in a petrochanica1 plant. These meters measure the steam..., cx:ndensate, natural gas, water, nitrogen and air flCMS to the different process units within the plant. This audit started as an attellPt to resolve discrepan::ies between the 650 PSIG steam distriootion and supply meters. Theoretically the sum...

Whitaker, W. S.

265

Surface cleanliness measurement procedure  

DOE Patents [OSTI]

A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

Schroder, Mark Stewart (Hendersonville, NC); Woodmansee, Donald Ernest (Simpsonville, SC); Beadie, Douglas Frank (Greenville, SC)

2002-01-01T23:59:59.000Z

266

PROCEDURE FOR PREPARING  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15, 2010Energy6 Frontera GenerationMedicine -PROCEDURE FOR

267

Factors involved in the operation of fiberoptic dynamic lane assignment signs  

E-Print Network [OSTI]

51 51 51 55 55 60 60 63 67 70 72 V. CONCLUSIONS AND RECOMMENDATIONS FINDINGS AND CONCLUSIONS Layout of the Fiberoptic Signs Sign Characteristics . Sign-Signal Coordination Driver Comprehension RECOMMENDATIONS Future Studies . Future... of the various turning movements more efficiently. The application of the concept of Dynamic Lane Assignment Signs (DALAS) to frontage applications is being investigated at Texas Transportation Institute (TTI) since 1989. A changeable message sign (CMS...

Sunkari, Srinivasa R

2012-06-07T23:59:59.000Z

268

Thermal oxidation procedure PREPARATION........................................................................................................................................... 2  

E-Print Network [OSTI]

procedure - 2 - Preparation. The preparation procedure sets up the power, gas supplies, cooling water, (DI to check all the supplies. Cooling water Gas supplies Routing DI water for wet oxidation We start........................................................................................................................................... 2 Step 1 Turn on the cooling water

Hochberg, Michael

269

Motor Vehicle Record Procedure Objective  

E-Print Network [OSTI]

Motor Vehicle Record Procedure Objective Outline the procedure for obtaining motor vehicle record (MVR) through Fleet Services. Vehicle Operator Policy 3. Operators with 7 or more points on their motor vehicle record

Kirschner, Denise

270

Shrinking Procedures and Optimal Algorithms  

E-Print Network [OSTI]

Jun 18, 2012 ... Optimal Stochastic Approximation Algorithms for Strongly Convex Stochastic Composite Optimization, II: Shrinking Procedures and Optimal ...

Saeed Ghadimi

2012-06-18T23:59:59.000Z

271

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry/Biotechnology Graduate Program. A detailed account of the academic requirements and procedures is provided for graduate students in chemistry; to promote consistency in procedures and standards; and to provide a basis for communication between

Kounaves, Samuel P.

272

Postgraduate Admissions Policy and Procedures  

E-Print Network [OSTI]

1 Postgraduate Admissions Policy and Procedures SCOPE OF POLICY This policy applies to all to both staff and applicants on the University's procedures for admitting postgraduate students PROCEDURES 5 3.1 Making an application 5 3.2 Application deadlines 5 3.3 Accreditation of Prior Learning (APL

273

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF THE UNIVERSITY LIBRARIAN University Policy PURPOSE 1.00 The following procedures define the method by which the appointment, or review and re-appointment, of the university librarian will be conducted. SCOPE 2.00 These procedures apply to: the appointment of a new

Victoria, University of

274

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

Page | 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF ACADEMIC ASSOCIATE VICE Review: February, 2018 PURPOSE 1.00 The following procedures define the method by which the appointment.00 These procedures apply to the appointment and reappointment of academic Associate Vice-Presidents. An Academic

Victoria, University of

275

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

Page | 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF DEANS University Policy No: GV0450 procedures define the method by which the appointment, or review and re-appointment, of deans will be conducted. SCOPE 2.00 These procedures apply to: the appointments of new deans, the review and re

Victoria, University of

276

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE and procedures is provided. The intent is to describe the programs and explain the rationale behind them of the Department; to promote consistency in procedures and standards; and to provide a basis for communication

Kounaves, Samuel P.

277

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

Page 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF THE ASSOCIATE DEAN ACADEMIC ADVISING Last Editorial Change: Mandated Review: May, 2018 PURPOSE 1.00 The following procedures define (Faculties of Science, Social Sciences and Humanities) will be conducted. SCOPE 2.00 These procedures apply

Victoria, University of

278

Capital Projects Delivery Procedures Manual  

E-Print Network [OSTI]

1 Capital Projects Delivery Procedures Manual September 4, 2008 Office of the CFO #12;2 Page I of the Capital Budget 11 B. Budget Approval 12 C. Setting Up Capital Projects 13 III. Procedures for Design ­ Office of the Chief Financial Officer Financial Policies and Procedures for the Capital Project Delivery

Alpay, S. Pamir

279

Microgrid Testing  

SciTech Connect (OSTI)

With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

Shirazi, M.; Kroposki, B.

2012-01-01T23:59:59.000Z

280

Utrecht University Academic Integrity Complaints Procedure This complaints procedure follows the national Model Complaints Procedure Academic  

E-Print Network [OSTI]

integrity or its researchers and guarantees it will investigate all well-founded suspicions of misconduct1 Utrecht University Academic Integrity Complaints Procedure This complaints procedure follows the national Model Complaints Procedure Academic Integrity of the joint Dutch universities. The model

Utrecht, Universiteit

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Model of Procedure Usage – Results from a Qualitative Study to Inform Design of Computer-Based Procedures  

SciTech Connect (OSTI)

The nuclear industry is constantly trying to find ways to decrease the human error rate, especially the human errors associated with procedure use. As a step toward the goal of improving procedure use performance, researchers, together with the nuclear industry, have been looking at replacing the current paper-based procedures with computer-based procedure systems. The concept of computer-based procedures is not new by any means; however most research has focused on procedures used in the main control room. Procedures reviewed in these efforts are mainly emergency operating procedures and normal operating procedures. Based on lessons learned for these previous efforts we are now exploring a more unknown application for computer based procedures - field procedures, i.e. procedures used by nuclear equipment operators and maintenance technicians. The Idaho National Laboratory, the Institute for Energy Technology, and participants from the U.S. commercial nuclear industry are collaborating in an applied research effort with the objective of developing requirements and specifications for a computer-based procedure system to be used by field operators. The goal is to identify the types of human errors that can be mitigated by using computer-based procedures and how to best design the computer-based procedures to do this. The underlying philosophy in the research effort is “Stop – Start – Continue”, i.e. what features from the use of paper-based procedures should we not incorporate (Stop), what should we keep (Continue), and what new features or work processes should be added (Start). One step in identifying the Stop – Start – Continue was to conduct a baseline study where affordances related to the current usage of paper-based procedures were identified. The purpose of the study was to develop a model of paper based procedure use which will help to identify desirable features for computer based procedure prototypes. Affordances such as note taking, markups, sharing procedures between fellow coworkers, the use of multiple procedures at once, etc. were considered. The model describes which affordances associated with paper based procedures should be transferred to computer-based procedures as well as what features should not be incorporated. The model also provides a means to identify what new features not present in paper based procedures need to be added to the computer-based procedures to further enhance performance. The next step is to use the requirements and specifications to develop concepts and prototypes of computer-based procedures. User tests and other data collection efforts will be conducted to ensure that the real issues with field procedures and their usage are being addressed and solved in the best manner possible. This paper describes the baseline study, the construction of the model of procedure use, and the requirements and specifications for computer-based procedures that were developed based on the model. It also addresses how the model and the insights gained from it were used to develop concepts and prototypes for computer based procedures.

Johanna H Oxstrand; Katya L Le Blanc

2012-07-01T23:59:59.000Z

282

HIsmelt{reg_sign} technology: the future of ironmaking  

SciTech Connect (OSTI)

The unique liquid ironmaking process of HIsmelt{reg_sign} technology produces LD-quality hot metal or pig iron using lower-quality iron ore and non-coking coal, and a variety of iron and carbon-bearing mill wastes, without blending or agglomeration. A HIsmelt facility can replace an obsolete blast furnace in a brownfield application or can be the iron-producing component of a greenfield state-of-the-art steelmaking plant. Two companies in China have signed license agreements to build HIsmelt facilities, but are waiting until the plant in Kwinana, Australia operates for 3 months without any shutdowns or delays before they start construction on their plants.

Leczo, T.

2009-03-15T23:59:59.000Z

283

On extended sign-changeable interactions in the dark sector  

E-Print Network [OSTI]

We extend the cosmological couplings proposed in Sun et al. and Wei, where they suggested interactions with change of signs along the cosmological evolution. Our extension liberates the changes of sign of the interaction from the deceleration parameter and from the relation of energy densities of the dark sector and considers the presence of non interactive matter. In three cases we obtain the general solutions and the results obtained in models fitted with Hubble's function and SNe Ia data, are analyzed regarding the problem of the cosmological coincidence, the problem of the crisis of the cosmological age and the magnitude of the energy density of dark energy at early universe. Also we graphically study the range of variation of, the actual dark matter density parameter, the effective equation of state of the dark energy and the redshift of transition to the accelerated regimen, generated by variations at order $1\\sigma$ in the coupling parameters.

Mónica Forte

2014-09-23T23:59:59.000Z

284

Sign reversal in optical nonlinearity: Impact of dielectric fied enhancement  

E-Print Network [OSTI]

Sign reversal in optical nonlinearity: Impact of dielectric fied enhancement Summary and Outlook Z(mm) T -10 -5 0 5 10 0.8 0.9 1.0 Irradiation from particle layer Irradiation from glass side T/T0 I0= 150 GWcm-2 Z(mm) -10 0 10 0,9 1,0 1,1 T/T0 =0 >0 Z(mm) optical

Mosegaard, Klaus

285

Signed Quality Assurance Hub Memo | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE Former Worker/EnergyFractureSheratonWhoSigned

286

DOE Signs Cooperative Agreement for New Hydrogen Power Plant | Department  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramofContract at its Hanford Siteof Energy Signs

287

LED exit signs: Improved technology leads the way to energy savings  

SciTech Connect (OSTI)

Recent innovations in light-emitting diode (LED) exit signs may make LED signs the best choice among the energy efficient options available. In the past, LED signs have offered low power consumption, projected long lamp life, and low maintenance requirements. Now, the best of the LED signs also offer improved optical designs that reduce their already low power consumption while improving visibility and appearance, and even reduce their cost. LED exit signs are gaining market share, and E Source expects this technology to eventually dominate over incandescent, compact fluorescent, and electroluminescent signs. More research is needed, however, to confirm manufacturers` claims of 20-year operating lives for LED signs. Conservative estimates place the number of exit signs in US buildings at about 40 million. Although each sign represents a very small part of a building`s load, exit signs are ready targets for energy efficiency upgrades -- they operate continuously and most use inefficient incandescent sources. With an LED sign, annual energy and maintenance costs can be reduced by more than 90 percent compared to a typical incandescent sign. Low annual costs help to offset the LED sign`s relatively high first cost. More than 25 utilities offer DSM incentives for energy efficient exit signs, and efficient alternatives are becoming more readily available. Recent improvements in optical designs enable many LED signs to visually out perform other sources. In addition to these benefits, LED exit signs have lower life cycle cost than most other options. The biggest barrier to their success, however, is that their first cost has been considerably higher than competing technologies. LED sign prices are falling rapidly, though, because manufacturers are continually improving optical designs of the fixtures to use fewer LEDs and thus even less energy while providing better performance.

Sardinsky, R.; Hawthorne, S.

1994-12-31T23:59:59.000Z

288

Design of an Experimental Facility for the Validation of Cooling Load Calculation Procedures.  

E-Print Network [OSTI]

??Two test cells were constructed to validate the ASHRAE cooling load calculation procedures developed under RP-875 and codified in the ASHRAE Loads Toolkit (RP987). The… (more)

Eldridge, David Stewart

2007-01-01T23:59:59.000Z

289

ECU Physicians Group Practice Policy and Procedure Manual  

E-Print Network [OSTI]

ECU Physicians Group Practice Policy and Procedure Manual Topic: HIV Antibody Testing # IM 13 Manual Topic: HIV Antibody Testing # IM 13 Section: 4 Section Name: Information Management Approval Date Section: 4 Section Name: Information Management Approval Date: 01/09/01 Medical Director Approval: Richard

290

Quality Assurance Procedures for ModCat Database Code Files  

SciTech Connect (OSTI)

The Quality Assurance procedures used for the initial phase of the Model Catalog Project were developed to attain two objectives, referred to as “basic functionality” and “visualization.” To ensure the Monte Carlo N-Particle model input files posted into the ModCat database meet those goals, all models considered as candidates for the database are tested, revised, and re-tested.

Siciliano, Edward R.; Devanathan, Ram; Guillen, Zoe C.; Kouzes, Richard T.; Schweppe, John E.

2014-04-01T23:59:59.000Z

291

Procedures for Students seeking accommodations.  

E-Print Network [OSTI]

This document outlines the procedures to be followed by students seeking accommodations in the following mathematics courses during Fall and Spring ...

292

Procedure Advantages Disadvantages Saphenous Vein  

E-Print Network [OSTI]

Procedure Advantages Disadvantages Saphenous Vein No anesthesia Not asep c Pedal Vein No anesthesia Serial bleeding okay Not asep c Tail Bleeding No anesthesia Serial bleeding okay

Scott, Robert A.

293

Procedure Advantages Disadvantages Saphenous Vein  

E-Print Network [OSTI]

Procedure Advantages Disadvantages Saphenous Vein No anesthesia Not asep c Pedal Vein No anesthesia Serial bleeding okay Not asep c Facial Vein No anesthesia Serial bleeding okay

Scott, Robert A.

294

Purchasing Policy and Procedures Page 1 Purchasing Policy and Procedures  

E-Print Network [OSTI]

Controller Responsible Offices: Purchasing Resource Services Controller's Office Origination Date: December 1Purchasing Policy and Procedures Page 1 4-1-2010 Purchasing Policy and Procedures Policy Statement are followed. Purchasing Resource Services (PRS), which is part of University Services, is the single point

Shahriar, Selim

295

U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian...  

Office of Environmental Management (EM)

U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian Nuclear Energy Research and Development U.S. and Canada Sign Agreement to Enhance Collaboration in Civilian...

296

Residential Mail Procedures Residential Mail Services  

E-Print Network [OSTI]

Residential Mail Procedures Residential Mail Services 23 Owens Hall Blacksburg, VA 24061 Phone.mailservices.vt.edu #12;Residential Mail Procedures Table of Contents General information.................................................................................8 #12;Residential Mail Procedures The following procedures have been establishes by the University

Buehrer, R. Michael

297

anechoic testing results: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

method for susceptibility testing according to the current DO160D standard. Test results on an Engine Data Processor using the implemented procedure and the comparisons...

298

W-026, acceptance test report controls {ampersand} instrumentation (submittal {number_sign}483)  

SciTech Connect (OSTI)

The air balance documents the attained air flows, air pressure differences and transient responses to simulated glovebox breach and power loss conditions.

Watson, T.L., Fluor Daniel Hanford

1997-02-21T23:59:59.000Z

299

Kuwaiti oil sector shows more signs of recovery  

SciTech Connect (OSTI)

This paper reports that Kuwait's oil sector continues to show signs of recovery from the Persian Gulf war. On Mar. 23 Kuwait Petroleum Co. (KPC) loaded the country's first shipment of liquefied petroleum gas for export since the Iraqi invasion in August 1990. In addition, the first shipment of Kuwaiti crude recovered from giant oil lakes formed by hundreds of wild wells sabotaged in the war was to arrive by tanker in Naples, Italy, late last month. The tanker is carrying 210,000 bbl of crude. However, the project to clean up the lakes and recover more oil, undertaken by Bechtel Corp. with Kuwait Oil Co. (KOC), has reached a stand still.

Not Available

1992-04-06T23:59:59.000Z

300

Sign singularity and flares in solar active region NOAA 11158  

E-Print Network [OSTI]

Solar Active Region NOAA 11158 has hosted a number of strong flares, including one X2.2 event. The complexity of current density and current helicity are studied through cancellation analysis of their sign-singular measure, which features power-law scaling. Spectral analysis is also performed, revealing the presence of two separate scaling ranges with different spectral index. The time evolution of parameters is discussed. Sudden changes of the cancellation exponents at the time of large flares, and the presence of correlation with EUV and X-ray flux, suggest that eruption of large flares can be linked to the small scale properties of the current structures.

Sorriso-Valvo, Luca; Kazachenko, Maria D; Krucker, Sam; Primavera, Leonardo; Servidio, Sergio; Vecchio, Antonio; Welsch, Brian T; Fisher, George H; Lepreti, Fabio; Carbone, Vincenzo

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE, State of Idaho Sign Agreement on Nuclear Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FYBeauTransitionDepartmentDOE, State of Idaho Sign

302

ORNL, Da Vinci Sign Licensing Agreement | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the ContributionsArms ControlChris Samoray Communications 865.241.0709ACRFDa Vinci Sign

303

Truman Signs Atomic Energy Act | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational NuclearhasAdministration go on moon walk at U.S.TimelineTruman Signs

304

Manufacturing - GE Appliances, ORNL sign agreement | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministrationManufacturing - GE Appliances, ORNL sign

305

Signs of a Stroke - HPMC Occupational Health Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBi (2)Sharing Smart GridShift EndSidney D.ChristopherNewsletterSigns

306

BEFORE YOU SIGN UP TO PRESENT YOUR PROPOSAL AT NEXT WEEK'S FINANCE COMMITTEE  

E-Print Network [OSTI]

BEFORE YOU SIGN UP TO PRESENT YOUR PROPOSAL AT NEXT WEEK'S FINANCE COMMITTEE YOU MUST COMPLETE Board/SAL/Advisor before you sign-up for Finance Committee. 2. Review the AICA By-Laws (specifically have completed 1-5 above, then sign up to present your Allocation Request at AICA Finance Committee

de Lijser, Peter

307

WRAP TRUPACT loading systems operational test report  

SciTech Connect (OSTI)

This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

308

LOCKOUT/TAGOUT Policy & Procedure  

E-Print Network [OSTI]

LOCKOUT/TAGOUT Policy & Procedure Office of Environmental Health and Safety 5425 Woodward, Suite This procedure establishes the Wayne State University requirements for the lockout of energy isolating devices that employee's duties include performing service or maintenance covered under this section. Lockout

Berdichevsky, Victor

309

Fuel Station Procedure Applicability All  

E-Print Network [OSTI]

Fuel Station Procedure Applicability All Last Revised 11/20/12 Procedure Owner Andrew Grant agrant for the purchasing and distribution of fuel for vehicles owned by Bowling Green State University (BGSU). This centralization is important to ensure compliance for BGSU employees who use the centralized fuel station and fuel

Moore, Paul A.

310

STANDARD OPERATING PROCEDURES Site Selection  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 126 Site Selection Date Last Modified Modified by: 09 References none #12;SOP 126: Site Selection 3 1.0 PURPOSE AND APPLICABILITY This standard operating procedure field conditions, and for ease of operation and maintenance. IMPROVE aerosol samplers are generally

Fischer, Emily V.

311

Advanced Vehicle Testing and Evaluation  

SciTech Connect (OSTI)

The objective of the United States (U.S.) Department of Energy?s (DOEs) Advanced Vehicle Testing and Evaluation (AVTE) project was to provide test and evaluation services for advanced technology vehicles, to establish a performance baseline, to determine vehicle reliability, and to evaluate vehicle operating costs in fleet operations. Vehicles tested include light and medium-duty vehicles in conventional, hybrid, and all-electric configurations using conventional and alternative fuels, including hydrogen in internal combustion engines. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: ? Development of test procedures, which established testing procedures; ? Baseline performance testing, which established a performance baseline; ? Accelerated reliability testing, which determined vehicle reliability; ? Fleet testing, used to evaluate vehicle economics in fleet operation, and ? End of test performance evaluation. Test results are reported by two means and posted by Idaho National Laboratory (INL) to their website: quarterly progress reports, used to document work in progress; and final test reports. This final report documents work conducted for the entirety of the contract by the Clarity Group, Inc., doing business as ECOtality North America (ECOtality). The contract was performed from 1 October 2005 through 31 March 2013. There were 113 light-duty on-road (95), off-road (3) and low speed (15) vehicles tested.

Garetson, Thomas

2013-03-31T23:59:59.000Z

312

Project W-320 Heel Jet Secondary Catch Mechanism lateral load test  

SciTech Connect (OSTI)

This test procedure establishes the requirements for performing a lateral load test of the Heel Jet Secondary Catch Mechanism (SCM). Successful performance of this test will demonstrate that the SCM is capable of performing as designed when subjected to a force applied normal to the longitudinal axis of the mechanism. This test procedure is prepared following the recommended format and content guidelines for test procedures as prescribed in WHC-IP-1026, Engineering Practice Guidelines, Appendix K, Test Plans, Specifications, Procedures and Reports.

Bellomy, J.R.

1994-09-01T23:59:59.000Z

313

Specified assurance level sampling procedure  

SciTech Connect (OSTI)

In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

Willner, O.

1980-11-01T23:59:59.000Z

314

Procedure for Performing In-Plane Membrane Conductivity Testing  

Broader source: Energy.gov [DOE]

Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

315

Argonne Facilitation of PHEV Standard Testing Procedure (SAE...  

Broader source: Energy.gov (indexed) [DOE]

Michael Duoba Danny Bocci Ted Bohn Richard Carlson Forrest Jehlik Henning Lohse-Busch Argonne National Laboratory This presentation does not contain any proprietary, confidential,...

316

Test Procedure for UV Weathering Resistance of Backsheet  

Broader source: Energy.gov (indexed) [DOE]

(a) Remove light reflection at the interface of Glass-Air and Air- Backsheet. (b) Avoid degradation of the polymer by ozone or active oxygen caused by UV light. Copyright 2013...

317

Heavy Duty Powertrain System Optimization and Emissions Test Procedure Development  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

318

ENERGY STAR Test Procedures and Verification | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1:EnergyDecember 10,ofRequirements | Department

319

DOE Issues Final Appliance Test Procedure Rule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at Multipleorder supplies orMilestone |EnergyThisannounced

320

Additional Guidance Regarding Application of Current Procedures for Testing  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' ResearchThe Office ofReporting (Connecticut)41Adam Garber - DeputyGas From the US

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

2014-04-10 Issuance: Test Procedures for Commercial Refrigeration  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 HouseCovered Consumer Product;Equipment; Final

322

2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3 Beryllium-Associated Worker2014 HouseCoveredAir Conditioners

323

Meeting Concerning Potential Test Procedures and Energy Conservation  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32 Master EM Project Definitionof| Department of

324

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOE ChallengeThese(NoticeStandards NOPR for Electric

325

DOE Launches Public Test Procedure Guidance Website | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOE ChallengeThese(NoticeStandardsEnergyThe

326

DOE Publishes Final Rule for Plumbing Products Test Procedures | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOEDOEAVAILABLE ONLINE AT:Departmenta SnapshotEnergyof

327

DOE Publishes Final Rule for Television Test Procedure | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOEDOEAVAILABLE ONLINE AT:DepartmentaEnergy has

328

DOE Seeks Comment on Application of Clothes Washer Test Procedure |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof EnergyAlliance | Department of Energy ADepartment of

329

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgram |DOEInfrastructureEnergy DOEDepartment of

330

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdf MoreProgramofContract at itsSelections forValuesDOEDetermination

331

Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program -Department of Energy benchmarking. EnergyEnergy

332

Test Procedure Development and Revision | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Energy TechnicalFlow Room AirNEPATerri T. Lee, OE

333

J1634 SAE BEV Test Procedures | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOE VehicleStationaryLaboratory,Iowa9: WhatA P OL IC Y

334

Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711) |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd: Scope Change #1 |MarketingVI,Program

335

Surface Environmental Surveillance Procedures Manual  

SciTech Connect (OSTI)

This manual establishes the procedures for the collection of environmental samples and the performance of radiation surveys and other field measurements. Responsibilities are defined for those personnel directly involved in the collection of samples and the performance of field measurements.

Hanf, RW; Dirkes, RL

1990-02-01T23:59:59.000Z

336

Forrestal Security and Safety Procedures  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish uniform procedures for the security and safety of the Forrestal Building and to inform all personnel of precautionary measures. This directive does not cancel another directive. Canceled by DOE N 251.11.

1983-02-02T23:59:59.000Z

337

Eastern Overthrust Belt. Signs of a hoped-for awakening  

SciTech Connect (OSTI)

Exploration for oil and gas is on the upswing in the SW Virginia sector of the Eastern Overthrust Belt in the 200-mile long portion between Lee and Montgomery Counties. In the past several months one new oil field has been opened and the area's only gas field has been revived after lying idle for 23 yr. These signs of a hoped-for awakening have been accompanied by an intense leasing program by many oil companies. This review is confined to the geology of the strongly folded and faulted area of SW Virginia. In the Overthrust area, early studies indicated that oil would be found only in portions of Lee and Scott Counties, and that other areas would contain only natural gas because of the greater intensity of regional metamorphism. Drilling so far has confirmed these forecasts. This study will be divided in a similar manner.

Bartlett, C.S. Jr.; Biggs, T.H.

1982-06-01T23:59:59.000Z

338

FASTPLOT: An interface to Microsoft{reg_sign} FORTRAN graphics  

SciTech Connect (OSTI)

Interface routines to the Microsoft{reg_sign} FORTRAN graphics library (GRAPHICS.LIB) are provided to facilitate development of graphics codes. These routines are collected into the FASTPLOT library (FASTPLOT.LIB). The FASTPLOT routines simplified the development of applications utilizing graphics and add capabilities not available in GRAPHICS.LIB such as plotting histograms, splines, symbols, and error bars. Specifically, these routines were utilized in the development of the mortality data viewing code, MORTVIEW, for the US Environmental Protection Agency. Routines for color imaging, developed for use with the X-ray Computer Tomography (XCT) imaging code, and examples are also provided in the FASTPLOT library. Many example uses of FASTPLOT.LIB are contained in this document to facilitate applications development. The FASTPLOT.LIB library, source, and applications programs are supplied on the accompanying FASTPLOT diskette.

Ward, R.C.

1994-03-01T23:59:59.000Z

339

Irrigation Pump Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfrared LandResponsesIon/SurfacePump-Testing Sign In About | Careers |

340

Graduate School of Journalism Interim Grievance Procedures  

E-Print Network [OSTI]

Graduate School of Journalism Interim Grievance Procedures Introduction The following procedures the Dean to conduct a hearing under the formal grievance procedures described in this statement. Those procedures, like the procedures of other schools, provide for a final appeal to the University Provost

Qian, Ning

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

An investigation of the effects of luminaire mounting height on roadside sign placement and visibility  

E-Print Network [OSTI]

. ometer. . 21 V-1 Iso-footcand i. e Curve 30-foot Mounting Height. . . . . . . . . . . . . . . 28 Iso-footcandle Curve 40-foot Mount ing Height. . . . . . . . . . . . , . 29 V-3 Effects on Legibility Distance for C'ondit tons Shown... for Cond it rona Shown . 55 9-15 Sign Bright ress and Disabrlity Vetting Brightness for Horditior. s Shown. 56 V- 16 Sign Brigncness and Disability Veiling Brightness for 30- and 40- foot. Mounting Heights. . . . . . . . . . . . . . v-17 Sign...

Walton, Ned Ephram

1966-01-01T23:59:59.000Z

342

SAFETY PROCEDURE SP-24 NATIONAL HIGH MAGNETIC  

E-Print Network [OSTI]

SAFETY PROCEDURE SP-24 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-24 VISITOR AND CONTRACTOR SAFETY DIRECTOR, ENVIRONMENTAL, HEALTH, SAFETY & SECURITY Angela Sutton

Weston, Ken

343

Export Authorizations - Procedures | Department of Energy  

Energy Savers [EERE]

Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

344

West Virginia University 1 Policies and Procedures  

E-Print Network [OSTI]

West Virginia University 1 Policies and Procedures In this Section: · Academic Integrity a Charge of Academic Dishonesty · Appeal Procedures for Cases Involving Academic Dishonesty Academic

Mohaghegh, Shahab

345

Postdoctoral Hiring Procedures | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hiring Procedures The Postdoctoral Office at DEP coordinates and facilitates the application, review, and hiring procedures for all postdoctoral candidates, following the...

346

Statler College Scheduling Guidelines General Procedures  

E-Print Network [OSTI]

Statler College Scheduling Guidelines General Procedures Basic event information needed o Event Procedures Basic event information needed o Event name o Contact name, phone, email o expected number

Mohaghegh, Shahab

347

Presidential Permits - Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with...

348

POLICY GUIDANCE MEMORANDUM #31 - Procedures for Regularizing...  

Energy Savers [EERE]

1 - Procedures for Regularizing Illegal Appointments POLICY GUIDANCE MEMORANDUM 31 - Procedures for Regularizing Illegal Appointments As part of the Department's ongoing effort to...

349

Procedures and Instructions | Department of Energy  

Energy Savers [EERE]

and Instructions Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for Preparing a Records Inventory and Disposition Schedule (RIDS)...

350

Brita Bergman (born 30/3 1946) CURRICULUM VITAE 2011 Sign Language Section, Department of Linguistics Abridged version  

E-Print Network [OSTI]

, and 5th Symposia of Sign Language Research (Stockholm 1979, Rome 1983, Lappeenranta 1987, Salamanca 1992

351

E-Print Network 3.0 - alternating sign matrices Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

After showing... the analogue we define ... Source: Moore, Kristen - Department of Mathematics, University of Michigan Collection: Mathematics 2 Full SignInvertibility and...

352

The Minimum Rank of Sign Pattern Matrices with a 1-Separation.  

E-Print Network [OSTI]

?? Given a sign pattern matrix M composed of two sub-patterns A and B connected by a 1-separation, we provide a formula that relates the… (more)

Zhou, Wenyan

2013-01-01T23:59:59.000Z

353

U.S. and Italy Sign Agreement to Collaborate on Carbon Capture...  

Office of Environmental Management (EM)

while coping with urgent energy security and climate challenges. The Clean Coal and Carbon Sequestration Annex signed between the two countries is part of the Obama...

354

Green Functions for the Wrong-Sign Quartic  

E-Print Network [OSTI]

It has been shown that the Schwinger-Dyson equations for non-Hermitian theories implicitly include the Hilbert-space metric. Approximate Green functions for such theories may thus be obtained, without having to evaluate the metric explicitly, by truncation of the equations. Such a calculation has recently been carried out for various $PT$-symmetric theories, in both quantum mechanics and quantum field theory, including the wrong-sign quartic oscillator. For this particular theory the metric is known in closed form, making possible an independent check of these approximate results. We do so by numerically evaluating the ground-state wave-function for the equivalent Hermitian Hamiltonian and using this wave-function, in conjunction with the metric operator, to calculate the one- and two-point Green functions. We find that the Green functions evaluated by lowest-order truncation of the Schwinger-Dyson equations are already accurate at the (6-8)% level. This provides a strong justification for the method and a motivation for its extension to higher order and to higher dimensions, where the calculation of the metric is extremely difficult.

H. F. Jones

2010-02-15T23:59:59.000Z

355

Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16 FORPoints ofProbingDewetting

356

Advanced Vehicle Testing Activity (AVTA) Data and Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office (VTO) supports work to develop test procedures and carry out testing on a wide range of advanced vehicles and technologies through the Advanced Vehicle Testing...

357

EML Procedures Manual, HASL-300  

SciTech Connect (OSTI)

Additions and corrections for the EML Procedures Manual, HASL-300, are presented for the following areas: wet/dry collector; ion chamber; field gamma spectrometry; TLD; reactive gas monitoring; cesium; cadmium and lead; carbon dioxide; polynuclear aromatic hydrocarbons; manganese precipitation samples; iron precipitation samples; aluminium precipitation samples; and lead precipitation samples.

Not Available

1981-09-28T23:59:59.000Z

358

Budget Reconciliation Procedures Reference Guide  

E-Print Network [OSTI]

Budget Reconciliation Procedures Reference Guide eDev Course Number FMS723 Subject Area Budget Northwestern University #12;Reference Guide Budget Reconciliation Table of Contents Helpful Contacts....................................................................................... 14 723QuickRefGuidev1.4 2 of 14 #12;Reference Guide Budget Reconciliation Helpful Contacts Below

Shull, Kenneth R.

359

Cooperative Education Detailed Operational Procedures  

E-Print Network [OSTI]

credits of Cooperative education for one of the required elective courses in the ME programME 3990 Cooperative Education Detailed Operational Procedures Overview Cooperative education and Aeronautical Engineering faculty. Cooperative education is not a required component of the ME program

de Doncker, Elise

360

EMISSIONS TO AIR OPERATIONAL PROCEDURE  

E-Print Network [OSTI]

EMISSIONS TO AIR OPERATIONAL PROCEDURE Swansea University Estates Services Singleton Park Swansea to Air Department: Estates and Facilities Site: All Author: Ambreen Jahangir Approved by: Mark Durdin PURPOSE: To minimise emissions and discharges to air from boilers, fume cupboards, air conditioning

Harman, Neal.A.

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Procedures for Faculty Appeal Tribunals are used in these procedures: 1. `Appellant' means a faculty member who is entitled to appeal a tenure, within the Policy, Section IV, clauses 6(a) and 6(b). II Documents Governing Appeal Procedures

Hitchcock, Adam P.

362

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Faculty General Grievance Procedure. OBJECTIVE This Procedure is designed to provide McMaster faculty members with prompt and impartial by existing, specific review procedures. It is intended to facilitate and promote informal resolution

Haykin, Simon

363

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Procedures for University Reviews copy held by the policy owner, the written copy prevails. #12;Procedures for University Reviews of Academic Departments April 28, 2005 1 Procedures for University Reviews of Academic Departments1 I

Haykin, Simon

364

Division of Human Resources University Grievance Procedures  

E-Print Network [OSTI]

Division of Human Resources University Grievance Procedures Employee Relations/ USF System Grievance Procedure Questions: (813) 974-2970 Rev. 12/2012 This procedure applies to Administration, Staff in this procedure are expressed in calendar days. If a deadline falls on a Saturday, Sunday or holiday, an action

Meyers, Steven D.

365

CSP Policies & Procedures Process for Grade Appeals  

E-Print Network [OSTI]

CSP Policies & Procedures Process for Grade Appeals Grade Appeals ­ Generally speaking, once grades

Leistikow, Bruce N.

366

LABORATORY ANIMAL FACILITIES STANDARD OPERATING PROCEDURE  

E-Print Network [OSTI]

4.A.22 LABORATORY ANIMAL FACILITIES STANDARD OPERATING PROCEDURE FOR OPERATION/MAINTENANCE. 2.0 Scope This procedure applies to all personnel needing to operate this equipment. 3.0 Procedure 3 OF QUANTIFLEX ANESTHESIA MACHINE/ SURGIVET SAV2500 VENTILATOR UNIT 1.0 Purpose This procedure outlines how

Krovi, Venkat

367

Ris-R-1263(EN) Procedures for Determination of  

E-Print Network [OSTI]

Plutonium procedure for seaweed 9 Plutonium procedure for 1-2 g sediment or soil 10 Americium procedure

368

NNSA Signs Memorandum with Kuwait to Increase Cooperation on Nuclear Safeguards and Nonproliferation  

ScienceCinema (OSTI)

On June 23, 2010, the National Nuclear Security Administration (NNSA) signed a Memorandum of Cooperation on nuclear safeguards and other nonproliferation topics with the Kuwait National Nuclear Energy Committee (KNNEC). NNSA Administrator Thomas D'Agostino and KNNEC's Secretary General, Dr. Ahmad Bishara, signed the memorandum at a ceremony at U.S. Department of Energy headquarters in Washington.

Thomas D'Agostino

2010-09-01T23:59:59.000Z

369

SETTING-UP AND PAYING UTILITIES SIGNING UP FOR UTILITY SERVICE  

E-Print Network [OSTI]

SETTING-UP AND PAYING UTILITIES SIGNING UP FOR UTILITY SERVICE When you sign up for utility service, you may be required to pay a deposit. Here are some questions you should ask a utility company should call to report service problems? If you have an issue with a utility company that you can

Bogaerts, Steven

370

Signs and Sight in Southern Uganda Representing Perception in Ordinary Conversation  

E-Print Network [OSTI]

124 Signs and Sight in Southern Uganda Representing Perception in Ordinary Conversation Ben Orlove-spoken language in the East African nation of Uganda, frequently include discussions and evaluations of signs, drawn from field work that we have conducted in Uganda, centers on a set of beliefs that certain sensory

Orlove, Benjamin S.

371

Silver Spring signs deal to make Sacramento meters smart June 23, 2009 | Camille Ricketts  

E-Print Network [OSTI]

GreenBeat Silver Spring signs deal to make Sacramento meters smart June 23, 2009 | Camille Ricketts Silver Spring Networks, one of the major players in the smart meter space, announced today that it signed a deal with the Sacramento Municipal Utility District to deploy a wireless network connecting smart

Lu, Chenyang

372

Energy Models for Drawing Signed Graphs Anne-Marie Kermarrec and Afshin Moin  

E-Print Network [OSTI]

Energy Models for Drawing Signed Graphs Anne-Marie Kermarrec and Afshin Moin INRIA Rennes Bretagne-dimensional space. Energy models are the prevalent approach to graph drawing. In this paper, we propose energy) or as negative (repulsive). The existent energy models do not discriminate against edge sign. Hence, they do

Paris-Sud XI, Université de

373

Thirty states sign ITER nuclear fusion plant deal 1 hour, 28 minutes ago  

E-Print Network [OSTI]

Thirty states sign ITER nuclear fusion plant deal 1 hour, 28 minutes ago Representatives of more than 30 countries signed a deal on Tuesday to build the world's most advanced nuclear fusion reactor nuclear reactors, but critics argue it could be at least 50 years before a commercially viable reactor

374

Review of International Methods of Test to Rate the Efficiency of Water Heaters  

E-Print Network [OSTI]

associated with the EU water heater test procedure loadEU test procedure for water heaters. Load No. Delivered Max.period to allow the water heater to adjust completely to

Lutz, Jim

2012-01-01T23:59:59.000Z

375

International Energy Agency design tool evaluation procedure  

SciTech Connect (OSTI)

Detailed state-of-the-art building energy simulation models from nations participating in International Energy Agency (IEA) Task VIII are used to develop a quantitative procedure to evaluate more simplified design tools. Simulations are performed with the detailed models on a series of cases that progress systematically from the extremely simple to the relatively realistic. Output values for the cases, such as annual loads, annual maximum and minimum temperatures, and peak loads, are used to set target ranges with which the results from more simplified design tools can be compared. The more realistic cases, although geometrically simple, test the ability of the design tools to model such combined effects as thermal mass, direct gain windows, overhangs, internally generated heat, and dead-band and set-back thermostat control strategies. 5 refs., 9 figs., 4 tabs.

Judkoff, R.; Barakat, S.; Bloomfield, D.; Poel, B.; Stricker, R.; van Haaster, P.; Wortman, D.

1988-07-01T23:59:59.000Z

376

Cylinder Test Specification  

SciTech Connect (OSTI)

The purpose of the cylinder testis two-fold: (1) to characterize the metal-pushing ability of an explosive relative to that of other explosives as evaluated by the E{sub 19} cylinder energy and the G{sub 19} Gurney energy and (2) to help establish the explosive product equation-of-state (historically, the Jones-Wilkins-Lee (JWL) equation). This specification details the material requirements and procedures necessary to assemble and fire a typical Los Alamos National Laboratory (LANL) cylinder test. Strict adherence to the cylinder. material properties, machining tolerances, material heat-treatment and etching processes, and high explosive machining tolerances is essential for test-to-test consistency and to maximize radial wall expansions. Assembly and setup of the cylinder test require precise attention to detail, especially when placing intricate pin wires on the cylinder wall. The cylinder test is typically fired outdoors and at ambient temperature.

Richard Catanach; Larry Hill; Herbert Harry; Ernest Aragon; Don Murk

1999-10-01T23:59:59.000Z

377

CBFWA Wildlife Habitat Evaluation Procedures (HEP)CBFWA Wildlife Habitat Evaluation Procedures (HEP) (2006(2006--006006--00)00)  

E-Print Network [OSTI]

CBFWA Wildlife Habitat Evaluation Procedures (HEP)CBFWA Wildlife Habitat Evaluation Procedures (HEP 101HEP 101 Habitat Evaluation Procedures (HEP) developed byHabitat Evaluation Procedures (HEP

378

Micro-tensile testing system  

DOE Patents [OSTI]

A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

Wenski, Edward G. (Lenexa, KS)

2007-07-17T23:59:59.000Z

379

Micro-tensile testing system  

DOE Patents [OSTI]

A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

Wenski, Edward G. (Lenexa, KS)

2007-08-21T23:59:59.000Z

380

Micro-tensile testing system  

DOE Patents [OSTI]

A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

Wenski, Edward G.

2006-01-10T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Advanced Technology Vehicle Testing  

SciTech Connect (OSTI)

The light-duty vehicle transportation sector in the United States depends heavily on imported petroleum as a transportation fuel. The Department of Energy’s Advanced Vehicle Testing Activity (AVTA) is testing advanced technology vehicles to help reduce this dependency, which would contribute to the economic stability and homeland security of the United States. These advanced technology test vehicles include internal combustion engine vehicles operating on 100% hydrogen (H2) and H2CNG (compressed natural gas) blended fuels, hybrid electric vehicles, neighborhood electric vehicles, urban electric vehicles, and electric ground support vehicles. The AVTA tests and evaluates these vehicles with closed track and dynamometer testing methods (baseline performance testing) and accelerated reliability testing methods (accumulating lifecycle vehicle miles and operational knowledge within 1 to 1.5 years), and in normal fleet environments. The Arizona Public Service Alternative Fuel Pilot Plant and H2-fueled vehicles are demonstrating the feasibility of using H2 as a transportation fuel. Hybrid, neighborhood, and urban electric test vehicles are demonstrating successful applications of electric drive vehicles in various fleet missions. The AVTA is also developing electric ground support equipment (GSE) test procedures, and GSE testing will start during the fall of 2003. All of these activities are intended to support U.S. energy independence. The Idaho National Engineering and Environmental Laboratory manages these activities for the AVTA.

James Francfort

2003-11-01T23:59:59.000Z

382

Test Administration Instructions for the Fullerton Advanced Balance (FAB) Scale  

E-Print Network [OSTI]

Test Administration Instructions for the Fullerton Advanced Balance (FAB) Scale 1. Stand with feet: Stopwatch with lanyard (for placing around neck). Safety Procedures: Position person being tested n a corner at eye level so participant and time can be monitored simultaneously. Testing procedures: Demonstrate

de Lijser, Peter

383

Low-cycle fatigue deformation characteristics of Haynes {reg{underscore}sign} HR-120{reg{underscore}sign} alloy  

SciTech Connect (OSTI)

Low-cycle fatigue deformation characteristics of HAYNES HR-120 alloy at room and high temperatures were studied under axial strain control. Test results show that there is a significant effect of test temperature on the low-cycle fatigue behavior of HAYNES HR-120 alloy. It was found that the alloy could cyclically harden at moderately high temperatures (649 C and 871 C), but generally cyclically soften at room temperature (24 C) and high temperature (982 C). However, the variation of the stress amplitude with cycles at the temperatures of 24 C and 982 C depended on the total strain range. The significant cyclic hardening of the alloy occurred at the high total strain ranges of 1.5% and 2.0% during the beginning state of the test at both 24C and 982 C. Microstructural analyses indicated that the cyclic hardening behavior of the alloy at the test temperature of 649 C could be related to the formation of a number of deformation bands. Nevertheless, increasing the test temperature to 871 C, cyclic hardening was attributed to the precipitation of secondary-phase particles. Furthermore, it was also found that the coarsening of secondary-phase particles brought about cyclic softening of the alloy at the high temperature of 982 C. Coffin-Manson equations and Holloman equations were given for HAYNES HR-120 alloy at different temperatures.

Liaw, P.K.; He, Y.H.; Miller, L.; Huang, M.; Brooks, C.R.; Seeley, R.R.; Klarstrom, D.L.

1999-07-01T23:59:59.000Z

384

Robust nuclear signal reconstruction by a novel ensemble model aggregation procedure P. Baraldi1  

E-Print Network [OSTI]

at the Finnish Pressurized Water Reactor (PWR) situated in Loviisa. 1. Introduction Sensors are placed at various Pressurized Water Reactor (PWR) situated in Loviisa. The novel procedure is applied and tested on both

Paris-Sud XI, Université de

385

Hail Impact Testing on Crystalline Si Modules with Flexible Packaging...  

Broader source: Energy.gov (indexed) [DOE]

Colorado pvmrw13ps2westpakbrown.pdf More Documents & Publications Test Procedure for UV Weathering Resistance of Backsheet Improved Reliability of PV Modules with Lexan PC...

386

Sandia National Laboratories: Beryllium High Heat Flux Testing...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

system, controls, and blast gun) is now used for electron beam test system vacuum vessel beryllium decontamination and has shortened the beryllium clean-up procedure from...

387

An investigation of wind loads on conventional and nonconventional highway signs  

E-Print Network [OSTI]

) With the flanged connection at the base of the tubular support the sign could be rotated. in 22. 5-degree increments allowing for a semi-controlled environment. (d) The wind loads on a sign with a single tubular support are believed to be of the same order...AN INVESTIGATION OF WIND LOADS ON CONVENTIONAL AND NONCONVENTIONAL HIGHWAY SIGNS A Thesis By Hayes Ellis Ross, Jr. Submitted to the Graduate College of the Texas A&M University in partial fulfillment of the requirements for the degree...

Ross, Hayes Ellis

1967-01-01T23:59:59.000Z

388

Waste segregation procedures and benefits  

SciTech Connect (OSTI)

Segregation is a critical first step in handling hazardous and radioactive materials to minimize the generation of regulated wastes. In addition, segregation can significantly reduce the complexity and the total cost of managing waste. Procedures at Sandia National Laboratories, Albuquerque require that wastes be segregated, first, by waste type (acids, solvents, low level radioactive, mixed, classified, etc.). Higher level segregation requirements, currently under development, are aimed at enhancing the possibilities for recovery, recycle and reapplication; reducing waste volumes; reducing waste disposal costs, and facilitating packaging storage, shipping and disposal. 2 tabs.

Fish, J.D.; Massey, C.D.; Ward, S.J.

1990-01-01T23:59:59.000Z

389

Procedure for Planning and Conducting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home DesignPresentationsSRS RespondsLift Plan Procedure Stanford

390

CALiPER Testing  

Broader source: Energy.gov [DOE]

The CALiPER (Commercially Available LED Product Evaluation and Reporting) program was launched by DOE in 2006 to support testing of a representative array of solid-state lighting products for general illumination, using industry-approved test procedures carried out by qualified test labs. The program has evolved right along with the SSL market and serves multiple needs. CALiPER testing and analysis identify trends, indicate SSL's suitability for particular applications, and detect secondary issues that require further scrutiny – such as glare, flicker, physical format, and reliability concerns. The program not only guides DOE planning and helps discourage low-quality products and inflated claims, but also serves as a useful tool for manufacturers seeking to improve their products, and for municipalities, utilities, and energy-efficiency programs seeking to make informed program decisions.

391

Issues in emissions testing of hybrid electric vehicles.  

SciTech Connect (OSTI)

Argonne National Laboratory (ANL) has tested more than 100 prototype HEVs built by colleges and universities since 1994 and has learned that using standardized dynamometer testing procedures can be problematic. This paper addresses the issues related to HEV dynamometer testing procedures and proposes a new testing approach. The proposed ANL testing procedure is based on careful hybrid operation mode characterization that can be applied to certification and R and D. HEVs also present new emissions measurement challenges because of their potential for ultra-low emission levels and frequent engine shutdown during the test cycles.

Duoba, M.; Anderson, J.; Ng, H.

2000-05-23T23:59:59.000Z

392

Soil Remediation Test  

SciTech Connect (OSTI)

Soils contaminated with petroleum by-products can now be effectively remediated using a variety of technologies. Among these are in-situ bioremediation, land farming, and landfill/replacing of soil. The range of efficiencies and cost effectiveness of these technologies has been well documented. Exsorbet Plus is showing promise as an in-situ bioremediation agent. It is made of naturally grown Spaghnum Peat Moss which has been activated for encapsulation and blended with nitrogen-rich fertilizer. In its initial field test in Caracas, Venezuela, it was able to remediate crude oil-contaminated soil in 90 days at less than half of the cost of competing technologies. Waste Solutions, Corp and the US Department of Energy signed a Cooperative Research and Development Agreement to test Exsorbet Plus at the Rocky Mountain Oilfield Testing Center near Casper, Wyoming. As part of the test, soil contaminated with crude oil was treated with Exsorbet Plus to aid the in-situ bioremediation process. Quantitative total petroleum hydrocarbon (TPH) measurements were acquired comparing the performance of Exsorbet Plus with an adjacent plot undergoing unaided in-situ bioremediation.

Manlapig, D. M.; Williamsws

2002-04-01T23:59:59.000Z

393

OLD DOMINION UNIVERSITY University Policies and Procedures  

E-Print Network [OSTI]

AND ADMINISTRATOR RECRUITMENT FUNDING PROCEDURE Statement: University Recruitment Budget (1) The university6010 - 1 OLD DOMINION UNIVERSITY University Policies and Procedures 6010 - FACULTY maintains a central budget, called the University Recruitment Budget, for the support of essential

394

Risk Management Procedures Category: Strategic Management  

E-Print Network [OSTI]

/POLICY SUPPORTED Risk Management Policy Tertiary Education Quality Standards Agency Act 2011 (TEQSA Act 2011) 21 Risk Management Procedures Category: Strategic Management 1. LEGISLATION/ENTERPRISE AGREEMENT. PROCEDURAL DETAILS 2.1. Responsibilities Entity / Officer Responsibilities Planning and Management Committee

395

SAFETY PROCEDURE SP-19 Revision 02  

E-Print Network [OSTI]

SAFETY PROCEDURE SP-19 Page 1 Revision 02 August 6, 2007 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-19 MAGNETIC FIELD SAFETY DIRECTOR, ENVIRONMENTAL, HEALTH, SAFETY & SECURITY Angela Sutton

Weston, Ken

396

Segmentation and visualization for cardiac ablation procedures  

E-Print Network [OSTI]

In this thesis, we present novel medical image analysis methods to improve planning and outcome evaluation of cardiac ablation procedures. Cardiac ablation is a common medical procedure that consists of burning cardiac ...

Depa, Michal

2011-01-01T23:59:59.000Z

397

POLICY: A:VPFA # / Purchasing Policy PROCEDURES  

E-Print Network [OSTI]

POLICY: A:VPFA # / Purchasing Policy PROCEDURES: APPENDIX: Approved: April 1, 2013 Revised: Cross References: Purchasing Policy Capital Projects and Renovations Policy Conflict of Interest Policy Sustainability Policy Green Procurement Policy 1 of 9 PROCEDURES: Purchasing Policy AUTHORITY: University

Martin, Jeff

398

A synthesis of the state-of-the-practice of the use of changeable message signs in Texas  

E-Print Network [OSTI]

Light Emitting Diode (LED), fiber optic, blank out), and Hybrid signs (fiber optic/reflective disk). Light-Reflecting CMSs Reflective Disk Signs There are three basic types of reflective disk matrix CMSs: circular disks, rectangular disks...

Hudders, Neal Andrew

1993-01-01T23:59:59.000Z

399

Yes, I would like to sign up for Finance Committee on: _____/_____/2014 (Please print clearly and legibly)  

E-Print Network [OSTI]

Yes, I would like to sign up for Finance Committee on: _____/_____/2014 (Please print clearly Name from AICA Leadership/Advisor Yes, I would like to sign up for Finance Committee on

de Lijser, Peter

400

Relay test program. Series 2 tests: Integral testing of relays and circuit breakers  

SciTech Connect (OSTI)

This report presents the results of a relay test program conducted by Brookhaven National Laboratory (BNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). The program is a continuation of an earlier test program the results of which were published in NUREG/CR-4867. The current program was carried out in two phases: electrical testing and vibration testing. The objective was primarily to focus on the electrical discontinuity or continuity of relays and circuit breaker tripping mechanisms subjected to electrical pulses and vibration loads. The electrical testing was conducted by KEMA-Powertest Company and the vibration testing was performed at Wyle Laboratories, Huntsville, Alabama. This report discusses the test procedures, presents the test data, includes an analysis of the data and provides recommendations regarding reliable relay testing.

Bandyopadhyay, K.K.; Kunkel, C.; Shteyngart, S. [Brookhaven National Lab., Upton, NY (United States)

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Proposal Submittal and Scheduling Procedures for Macromolecular...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL...

402

Delegation Procedures - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directives Program Management Camille...

403

PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL ...  

E-Print Network [OSTI]

Apr 16, 2010 ... PROCEDURES and INSTRUCTIONS for SUBMITTING FINAL GRADES. Please view rather than print this information. A version without ...

saerens

2010-04-16T23:59:59.000Z

404

AGEING PROCEDURES ON LITHIUM BATTERIES IN AN INTERNATIONAL COLLABORATION CONTEXT  

SciTech Connect (OSTI)

The widespread introduction of electrically-propelled vehicles is currently part of many political strategies and introduction plans. These new vehicles, ranging from limited (mild) hybrid to plug-in hybrid to fully-battery powered, will rely on a new class of advanced storage batteries, such as those based on lithium, to meet different technical and economical targets. The testing of these batteries to determine the performance and life in the various applications is a time-consuming and costly process that is not yet well developed. There are many examples of parallel testing activities that are poorly coordinated, for example, those in Europe, Japan and the US. These costs and efforts may be better leveraged through international collaboration, such as that possible within the framework of the International Energy Agency. Here, a new effort is under development that will establish standardized, accelerated testing procedures and will allow battery testing organizations to cooperate in the analysis of the resulting data. This paper reviews the present state-of-the-art in accelerated life testing in Europe, Japan and the US. The existing test procedures will be collected, compared and analyzed with the goal of international collaboration.

Jeffrey R. Belt; Ira Bloom; Mario Conte; Fiorentino Valerio Conte; Kenji Morita; Tomohiko Ikeya; Jens Groot

2010-11-01T23:59:59.000Z

405

CERN News - A major contract has been signed for the supply of solar panels derived from CERN technology  

E-Print Network [OSTI]

CERN News - A major contract has been signed for the supply of solar panels derived from CERN technology

CERN Video Productions; Marion Viguier

2012-01-01T23:59:59.000Z

406

Environmental Measurements Laboratory (EML) procedures manual  

SciTech Connect (OSTI)

Volume 1 of this manual documents the procedures and existing technology that are currently used by the Environmental Measurements Laboratory. A section devoted to quality assurance has been included. These procedures have been updated and revised and new procedures have been added. They include: sampling; radiation measurements; analytical chemistry; radionuclide data; special facilities; and specifications. 228 refs., 62 figs., 37 tabs. (FL)

Chieco, N.A.; Bogen, D.C.; Knutson, E.O. (eds.)

1990-11-01T23:59:59.000Z

407

Standards and Procedures for Promotion and Tenure  

E-Print Network [OSTI]

Appendix C Standards and Procedures for Promotion and Tenure I. Preamble This document sets forth standards and procedures for faculty promotions and appointments to tenure. These standards and procedures by university needs, plans, and resources. II. Standards The criteria outlined below are, of necessity

Heller, Barbara

408

Faculty Code Chapter 28 Adjudication Filing Procedures  

E-Print Network [OSTI]

Faculty Code Chapter 28 Adjudication Filing Procedures Secretary of the Faculty 10/2014 #12;Page 1 |Adjudication Introduction| Chapter 28 of the Faculty Code sets forth the adjudicative procedures to be used resolution procedures are available at any time during the resolution process, including the time period

Van Volkenburgh, Elizabeth

409

Dartmouth College Employment Policies and Procedures Manual  

E-Print Network [OSTI]

Dartmouth College Employment Policies and Procedures Manual Policy last updated: April 25, 2008 Grievance Procedure, Equal Opportunity Applies to: All employees Policy Statement: Dartmouth College of the Equal Opportunity Policy may bring a complaint under the Equal Opportunity Grievance Procedure. In some

Myers, Lawrence C.

410

PROCEDURES FOR THE SEARCH, APPOINTMENT, OR REAPPOINTMENT  

E-Print Network [OSTI]

1 PROCEDURES FOR THE SEARCH, APPOINTMENT, OR REAPPOINTMENT OF THE PRESIDENT AND VICE- CHANCELLOR of Senate establish procedures for the recommendation and selection of the President and shall subsequently appoint the President. The following procedures determine the method by which the Board of Governors

Victoria, University of

411

UNIVERSITY OF FLORIDA RULES AND PROCEDURES  

E-Print Network [OSTI]

UNIVERSITY OF FLORIDA RULES AND PROCEDURES OF THE STUDENT SENATE ____________________________________________________________ Issued by the Office of the Student Senate Special Committee on Rules and Procedures October 2008 Amended through February, 2014 #12;#12;RULES AND PROCEDURES OF THE STUDENT SENATE TABLE OF CONTENTS

Roy, Subrata

412

Competency Patient Care Sub Domain Procedures  

E-Print Network [OSTI]

Competency Patient Care Sub Domain Procedures Learning Objective Understands informed consent and performs uncomplicated procedures on patients or in simulation Milestones Year I Year II Year III Year IV Mid End Mid End Mid End Mid End · Defines elements of informed consent for procedures · Explains

Leistikow, Bruce N.

413

Automated Operating Procedures for Transfer Limits  

E-Print Network [OSTI]

Automated Operating Procedures for Transfer Limits Final Project Report Power Systems Engineering · Illinois · Iowa State · Texas A&M · Washington State · Wisconsin Automated Operating Procedures operating procedures to establish system constraints, particularly in regards to transfer limits across

414

UCSD Implementing Procedures 36/Classification of Positions  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1) 36/Classification of Positions I. REFERENCES AND RELATED POLICIES A. UCSD Implementing Procedures 20 ­ Recruitment B. UC PPSM 36 - Classification of Positions C shall be obtained prior to any commitment to the concerned individual. III. PROCEDURES A. New

Tsien, Roger Y.

415

STANDARD OPERATING PROCEDURES Annual Site Maintenance  

E-Print Network [OSTI]

IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

Fischer, Emily V.

416

PHYSICAL PLANT OPERATING POLICY AND PROCEDURE  

E-Print Network [OSTI]

PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 04.05: Development of Standard Labor Charge and Procedure (PP/OP) is to establish procedures for the development of a standard labor charge rate used when-600) ­ Account used to fund all maintenance and operation expenses for Custodial Services #12;June 7, 2010 Page 2

Gelfond, Michael

417

Pre-Service Teachers' and Students' (Mis)Conceptions About the Equal Sign  

E-Print Network [OSTI]

; Denmark, Barco, & Voran, 1976; Van de Walle, 1980 as cited in Baroody & Ginsberg, 1983). Denmark, Barco, and Voran (1976) came to a similar conclusion as Collis, who believed students were not intellectually ready to interpret the equal sign, and also...

Vela, Katherine

2012-02-14T23:59:59.000Z

418

PERIODIC SOLUTIONS WITH NONCONSTANT SIGN IN ABEL EQUATIONS OF THE SECOND KIND  

E-Print Network [OSTI]

PERIODIC SOLUTIONS WITH NONCONSTANT SIGN IN ABEL EQUATIONS OF THE SECOND KIND JOSEP M. OLM, XAVIER, is equivalent. Key words and phrases. Abel differential equations, periodic solutions. 1 #12;2 JOSEP M. OLM

Politècnica de Catalunya, Universitat

419

La ferme au toit de tuiles. Jacques Berque, la colonisation et ses signes.  

E-Print Network [OSTI]

ne serait pas superficiel mais serait tout à la fois signe, symbole, trace et vestige d'un univers Manuscrit auteur, publié dans "De L'Atlas à l'Orient musulman. Contributions en hommage à Daniel Rivet

Paris-Sud XI, Université de

420

Real-Time Camera Tracking and 3D Reconstruction Using Signed Distance Functions  

E-Print Network [OSTI]

show that by representing the geometry with a signed distance function (SDF), the camera pose can be efficiently estimated by directly minimizing the error of the depth images on the SDF. As the SDF contains

Lunds Universitet

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

The California Museum of Photography at UCR ARTSblock presents a reception and book signing  

E-Print Network [OSTI]

The California Museum of Photography at UCR ARTSblock presents a reception and book signing ROBERTO's photographs, Blockaded: A photographic itinerary through Iran, North Korea, and Cuba (on view at the museum

Mills, Allen P.

422

A thermodynamically compatible splitting procedure in hyperelasticity  

SciTech Connect (OSTI)

A material is hyperelastic if the stress tensor is obtained by variation of the stored energy function. The corresponding 3D mathematical model of hyperelasticity written in the Eulerian coordinates represents a system of 14 conservative partial differential equations submitted to stationary differential constraints. A classical approach for numerical solving of such a 3D system is a geometrical splitting: the 3D system is split into three 1D systems along each spatial direction and solved then by using a Godunov type scheme. Each 1D system has 7 independent eigenfields corresponding to contact discontinuity, longitudinal waves and shear waves. The construction of the corresponding Riemann solvers is not an easy task even in the case of isotropic solids. Indeed, for a given specific energy it is extremely difficult, if not impossible, to check its rank-one convexity which is a necessary and sufficient condition for hyperbolicity of the governing equations. In this paper, we consider a particular case where the specific energy is a sum of two terms. The first term is the hydrodynamic energy depending only on the density and the entropy, and the second term is the shear energy which is unaffected by the volume change. In this case a very simple criterion of hyperbolicity can be formulated. We propose then a new splitting procedure which allows us to find a numerical solution of each 1D system by solving successively three 1D sub-systems. Each sub-system is hyperbolic, if the full system is hyperbolic. Moreover, each sub-system has only three waves instead of seven, and the velocities of these waves are given in explicit form. The last property allows us to construct reliable Riemann solvers. Numerical 1D tests confirm the advantage of the new approach. A multi-dimensional extension of the splitting procedure is also proposed.

Favrie, N., E-mail: nicolas.favrie@univ-amu.fr; Gavrilyuk, S., E-mail: sergey.gavrilyuk@univ-amu.fr; Ndanou, S., E-mail: serge.ndanou@univ-amu.fr

2014-08-01T23:59:59.000Z

423

Prematurely terminated slug tests  

SciTech Connect (OSTI)

A solution of the well response to a prematurely terminated slug test (PTST) is presented. The advantages of a PTST over conventional slug tests are discussed. A systematized procedure of a PTST is proposed, where a slug test is terminated in the midpoint of the flow point, and the subsequent shut-in data is recorded and analyzed. This method requires a downhole shut-in device and a pressure transducer, which is no more than the conventional deep-well slug testing. As opposed to slug tests, which are ineffective when a skin is present, more accurate estimate of formation permeability can be made using a PTST. Premature termination also shortens the test duration considerably. Because in most cases no more information is gained by completing a slug test to the end, the author recommends that conventional slug tests be replaced by the premature termination technique. This study is part of an investigation of the feasibility of geologic isolation of nuclear wastes being carried out by the US Department of Energy and the National Cooperative for the Storage of Radioactive Waste of Switzerland.

Karasaki, K. (Lawrence Berkeley Lab., CA (USA))

1990-07-01T23:59:59.000Z

424

Pickliq{reg_sign} Process Pilot Program. Quarterly report, 2nd quarter 1997  

SciTech Connect (OSTI)

Work on the funded project was completed during this period. The final report will be issued within the next week. The Pickliq{reg_sign} Process has been found to be economically viable in the copper industry and is expected to be viable in steel-hydrochloric acid applications with the development of a new hydrochloric acid regeneration process associated with the Pickliq{reg_sign} Process.

NONE

1997-07-22T23:59:59.000Z

425

SCREENING TESTS FOR IMPROVED METHANE CRACKING MATERIALS  

SciTech Connect (OSTI)

Bench scale (1 to 6 gram) methane cracking tests have been performed on a variety of pure elements, some alloys, and SAES{reg_sign} commercial getters St 101, St 198, St 707, St 737, and St 909 to determine methane cracking performance (MCP) of 5% methane in a helium carrier at 700 C, 101.3 kPa (760 torr) with a 10 sccm feed. The MCP was almost absent from some materials tested while others showed varying degrees of MCP. Re, Cr, V, Gd, and Mo powders had good MCP, but limited capacities. Nickel supported on kieselguhr (Ni/k), a Zr-Ni alloy, and the SAES{reg_sign} getters had good MCP in a helium carrier. The MCP of these same materials was suppressed in a hydrogen carrier stream and the MCP of the Zr-based materials was reduced by nitride formation when tested with a nitrogen carrier gas.

Klein, J; Jeffrey Holder, J

2007-07-16T23:59:59.000Z

426

Solubility testing of actinides on breathing-zone and area air samples  

SciTech Connect (OSTI)

A solubility testing method for several common actinides has been developed with sufficient sensitivity to allow profiles to be determined from routine breathing zone and area air samples in the workplace. Air samples are covered with a clean filter to form a filter-sample-filter sandwich which is immersed in an extracellular lung serum simulant solution. The sample is moved to a fresh beaker of the lung fluid simulant each day for one week, and then weekly until the end of the 28 day test period. The soak solutions are wet ashed with nitric acid and hydrogen peroxide to destroy the organic components of the lung simulant solution prior to extraction of the nuclides of interest directly into an extractive scintillator for subsequent counting on a Photon-Electron Rejecting Alpha Liquid Scintillation (PERALS{reg_sign}) spectrometer. Solvent extraction methods utilizing the extractive scintillators have been developed for the isotopes of uranium, plutonium, and curium. The procedures normally produce an isotopic recovery greater than 95% and have been used to develop solubility profiles from air samples with 40 pCi or less of U{sub 3}O{sub 8}. Profiles developed for U{sub 3}O{sub 8} samples show good agreement with in vitro and in vivo tests performed by other investigators on samples from the same uranium mills.

Metzger, R.L.; Jessop, B.H.; McDowell, B.L. [Radiation Safety Engineering, Inc., Chandler, AZ (United States)

1996-02-01T23:59:59.000Z

427

Standard Test Method for Sandwich Corrosion Test  

E-Print Network [OSTI]

1.1 This test method defines the procedure for evaluating the corrosivity of aircraft maintenance chemicals, when present between faying surfaces (sandwich) of aluminum alloys commonly used for aircraft structures. This test method is intended to be used in the qualification and approval of compounds employed in aircraft maintenance operations. 1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information. 1.3 This standard may involve hazardous materials, operations, and equipment. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific hazard statements appear in Section 9.

American Society for Testing and Materials. Philadelphia

2009-01-01T23:59:59.000Z

428

Radiological Work Planning and Procedures  

E-Print Network [OSTI]

Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

Kurtz, J E

2000-01-01T23:59:59.000Z

429

Perform Ultrasonic Testing on Cs Capsule Overpacks  

SciTech Connect (OSTI)

This procedure provides a safe, uniform method for the performance of the ultrasonic weld inspection of the Cesium capsule overpacks. The inspection system will detect cracks, lack of fusion, and lack of penetration. This computer controlled automated system will perform the examination once the capsule overpack has been placed in the pool cell. Examination of the capsule overpacks will be in accordance with drawing H-283014, REV. 0 ,and a certified NDE examiner will perform the test procedure, provide analysis, and test documentation.

DAVIS, S.J.

2000-04-06T23:59:59.000Z

430

Writer`s guide for technical procedures  

SciTech Connect (OSTI)

A primary objective of operations conducted in the US Department of Energy (DOE) complex is safety. Procedures are a critical element of maintaining a safety envelope to ensure safe facility operation. This DOE Writer`s Guide for Technical Procedures addresses the content, format, and style of technical procedures that prescribe production, operation of equipment and facilities, and maintenance activities. The DOE Writer`s Guide for Management Control Procedures and DOE Writer`s Guide for Emergency and Alarm Response Procedures are being developed to assist writers in developing nontechnical procedures. DOE is providing this guide to assist writers across the DOE complex in producing accurate, complete, and usable procedures that promote safe and efficient operations that comply with DOE orders, including DOE Order 5480.19, Conduct of Operations for DOE Facilities, and 5480.6, Safety of Department of Energy-Owned Nuclear Reactors.

NONE

1998-12-01T23:59:59.000Z

431

HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES  

SciTech Connect (OSTI)

This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

Ronald L. Boring; David I. Gertman; Katya Le Blanc

2011-09-01T23:59:59.000Z

432

ISOLOK VALVE ACCEPTANCE TESTING FOR DWPF SME SAMPLING PROCESS  

SciTech Connect (OSTI)

Evaluation of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. Of the opportunities, a focus area related to optimizing the equipment and efficiency of the sample turnaround time for DWPF Analytical Laboratory was identified. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) evaluated the possibility of using an Isolok{reg_sign} sampling valve as an alternative to the Hydragard{reg_sign} valve for taking process samples. Previous viability testing was conducted with favorable results using the Isolok sampler and reported in SRNL-STI-2010-00749 (1). This task has the potential to improve operability, reduce maintenance time and decrease CPC cycle time. This report summarizes the results from acceptance testing which was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 (2) and which was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNL-RP-2011-00145 (3). The Isolok to be tested is the same model which was tested, qualified, and installed in the Sludge Receipt Adjustment Tank (SRAT) sample system. RW-0333P QA requirements apply to this task. This task was to qualify the Isolok sampler for use in the DWPF Slurry Mix Evaporator (SME) sampling process. The Hydragard, which is the current baseline sampling method, was used for comparison to the Isolok sampling data. The Isolok sampler is an air powered grab sampler used to 'pull' a sample volume from a process line. The operation of the sampler is shown in Figure 1. The image on the left shows the Isolok's spool extended into the process line and the image on the right shows the sampler retracted and then dispensing the liquid into the sampling container. To determine tank homogeneity, a Coliwasa sampler was used to grab samples at a high and low location within the mixing tank. Data from the two locations were compared to determine if the contents of the tank were well mixed. The Coliwasa sampler is a tube with a stopper at the bottom and is designed to obtain grab samples from specific locations within the drum contents. A position paper (4) was issued to address the prototypic flow loop issues and simulant selections. A statistically designed plan (5) was issued to address the total number of samples each sampler needed to pull, to provide the random order in which samples were pulled and to group samples for elemental analysis. The TTR required that the Isolok sampler perform as well as the Hydragard sampler during these tests to ensure the acceptability of the Isolok sampler for use in the DWPF sampling cells. Procedure No.L9.4-5015 was used to document the sample parameters and process steps. Completed procedures are located in R&D Engineering job folder 23269.

Edwards, T.; Hera, K.; Coleman, C.; Jones, M.; Wiedenman, B.

2011-12-05T23:59:59.000Z

433

PROCEDURES FOR ACCESS TO AND CORRECTION OF INFORMATION Procedural Authority: University Secretary Effective Date: January, 2010  

E-Print Network [OSTI]

PROCEDURES FOR ACCESS TO AND CORRECTION OF INFORMATION Procedural Authority: University Secretary Effective Date: January, 2010 Procedural Officer: University Archivist Supersedes: New Last Editorial Change of these procedures is to set out how the university will manage: · freedom of information requests; · requests

Victoria, University of

434

Whole-House Energy Analysis Procedures for Existing Homes: Preprint  

SciTech Connect (OSTI)

This paper describes a proposed set of guidelines for analyzing the energy savings achieved by a package of retrofits or an extensive rehabilitation of an existing home. It also describes certain field test and audit methods that can help establish accurate building system performance characteristics that are needed for a meaningful simulation of whole-house energy use. Several sets of default efficiency values have been developed for older appliances that cannot be easily tested and for which published specifications are not readily available. These proposed analysis procedures are documented more comprehensively in NREL Technical Report TP-550-38238.

Hendron, R.

2006-08-01T23:59:59.000Z

435

Thermal well-test method  

DOE Patents [OSTI]

A well-test method involving injection of hot (or cold) water into a groundwater aquifer, or injecting cold water into a geothermal reservoir. By making temperature measurements at various depths in one or more observation wells, certain properties of the aquifer are determined. These properties, not obtainable from conventional well test procedures, include the permeability anisotropy, and layering in the aquifer, and in-situ thermal properties. The temperature measurements at various depths are obtained from thermistors mounted in the observation wells.

Tsang, Chin-Fu (Albany, CA); Doughty, Christine A. (Berkeley, CA)

1985-01-01T23:59:59.000Z

436

Rotating equipment shop testing  

SciTech Connect (OSTI)

Poor performance of machinery after commissioning at first draws comments on whether the purchase specification was in order, whether there were any lapses in stage inspection or whether the performance test procedure was inadequate. Attempts are initiated to find out whether there were any deviations in operating conditions from the purchase specifications, inadvertent lapses in operation or any mistakes by the maintenance Dept. It will be of some interest to mention here a difference between operating companies who have taken over existing plants and engineering consulting companies who have engineered and constructed the plants. The specialist rotating machinery group of engineering consultant companies have a good understanding of what can be achieved at the manufacturer's test facility due to repeated dealings with manufacturers. However, operating company understanding varies from one organization to the next. This article gives an overview of rotating machinery with respect to test objectives and field problems.

Godse, A.G. (Kuwait National Petroleum Co., Shuaiba (KW))

1990-01-01T23:59:59.000Z

437

National High Magnetic Field Laboratory - Policies and Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Policies & Procedures Arrow Magnet Lab Policies and Procedures Numerous policies and procedures are in place at the Magnet Lab. Follow these links to learn more about them:...

438

Forecasting Dangerous Inmate Misconduct: An Applications of Ensemble Statistical Procedures  

E-Print Network [OSTI]

of Ensemble Statistical Procedures ? Richard A. Berk Brianpopular classi?cation procedures do no better than theand employ classi?cation procedures that identify inmates

Richard A. Berk; Brian Kriegler; Jong-Ho Baek

2011-01-01T23:59:59.000Z

439

Attachment 1: Green Lease Policies and Procedures for Lease Acquisitio...  

Office of Environmental Management (EM)

1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease...

440

Texas A&M AgriLife Extension Service Procedures 21.99.99.X0.01 Inventory Procedures  

E-Print Network [OSTI]

Texas A&M AgriLife Extension Service Procedures 21.99.99.X0.01 Inventory Procedures Approved: JulyLife Extension Service Procedures 21.99.99.X0.01 Inventory Procedures Page 1 of 1 PROCEDURE STATEMENT Texas A in regulations. REASON FOR PROCEDURE This procedure outlines the process and responsibilities regarding

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Ris-R-1093(EN) European Wind Turbine Testing  

E-Print Network [OSTI]

Risø-R-1093(EN) European Wind Turbine Testing Procedure Developments Task 2: Power Quality Poul #12;Contents Preface 5 1 Introduction 6 2 Standards and measurement procedures 6 3 Wind turbines 7 3 The present report describes the work done in the power quality subtask of the European Wind Turbine Testing

442

Radiological Work Planning and Procedure  

SciTech Connect (OSTI)

Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD.

KURTZ, J.E.

2000-01-01T23:59:59.000Z

443

EMERGENCY PROCEDURES University of California, Irvine  

E-Print Network [OSTI]

-6200 Hazardous Materials Release · If anyone is in danger, call 911 · Move away to a safe location · Alert others/Bomb Threat · Do not touch or disturb the object/package · If phone-in threat, get information about location to a lighted area · Exits may be indicated by lighted signs Evacuation Information · Evacuate the building

Shinozuka, Masanobu

444

Summative Mass Closure: Laboratory Analytical Procedure (LAP...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Prepared under Task No. BB072230 NREL Laboratory Analytical Procedures for standard biomass analysis are available electronically at http:www.nrel.govbiomass...

445

Microsoft Word - EPRR_procedures_041015.docx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procedure for Routine Validation of Gamma Spectroscopy, Chemical Separation Alpha Spectrometry, Gas Proportional Counting, and Liquid Scintillation Analytical Data SOP-5169...

446

Postdoctoral Extension Procedures | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Extension Procedures The Postdoctoral Office at DEP is responsible for processing the postdoctoral appointment extensions. It is important that all Argonne programmatic divisions...

447

Minnesota Environmental Coordination Procedures Act (Minnesota)  

Broader source: Energy.gov [DOE]

This Act is designed to streamline the review procedures for a given project that requires multiple environmental permits “by establishing a mechanism in state government which will coordinate...

448

STANDARD OPERATING PROCEDURE ACIDS CONTAINING PHOSPHOROUS  

E-Print Network [OSTI]

12.1 STANDARD OPERATING PROCEDURE for ACIDS CONTAINING PHOSPHOROUS Location(s): ___________________________________________________ Chemical(s): Hypophosphorous acid, methylphosphonic acid, phosphonic acid, phosphoric acid, phosphorous

Pawlowski, Wojtek

449

Radiation Safety Policy and Procedures Committee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RSPPC Meeting Minutes APS only Radiation Safety Policy and Procedures Committee Charter 1. Purpose The committee reviews functional changes to the Access Control Interlock System...

450

Hazardous Material Packaging for Transport - Administrative Procedures  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establ1sh administrative procedures for the certification and use of radioactive and other hazardous materials packaging by the Department of Energy (DOE).

1986-09-30T23:59:59.000Z

451

Petroleum Pipeline Eminent Domain Permit Procedures (Georgia)  

Broader source: Energy.gov [DOE]

The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection...

452

Hybrid LP/SDP Bounding Procedure  

E-Print Network [OSTI]

Hybrid LP/SDP Bounding Procedure. Fabio Furini1 and Emiliano Traversi2. 1 LIPN, Université Paris 13, 93430 Villetaneuse, France.

2012-10-24T23:59:59.000Z

453

UCSD Implementing Procedures Effective Date: July 1, 1996 Page 1  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1/Definitions of Terms B. UCSD Implementing Procedures 14/Affirmative Action C. UCSD Implementing Procedures 23/Performance Appraisal D. UC PPSM 30/Salary E. UCSD Implementing Procedures 30/Salary Equity Increase

Tsien, Roger Y.

454

Simulation analysis of a printed circuit board functional test process  

E-Print Network [OSTI]

to determine the source of the bottleneck, a study analyzing the operating capacity of the functional testing area was performed. Specifically, the capacity analysis divided the total time required to test printed circuit boards by the total testing time... with an on-line terminal connected to a mainframe. The mainframe generates the diagnostic tests performed on the boards which pass through the area. Complicating the test procedure is the fact that each test station is capable of testing only specific...

Brinkley, Paul Andrew

1991-01-01T23:59:59.000Z

455

Test Images  

E-Print Network [OSTI]

Test Images. I hope to have a set of test images for the course soon. Some images are available now; some will have to wait until I can find another 100-200

456

Pollutant Assessments Group Procedures Manual: Volume 1, Administrative and support procedures  

SciTech Connect (OSTI)

This manual describes procedures currently in use by the Pollutant Assessments Group. The manual is divided into two volumes: Volume 1 includes administrative and support procedures, and Volume 2 includes technical procedures. These procedures are revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy. Format inconsistencies will be corrected in subsequent revisions of individual procedures. The purpose of the Pollutant Assessments Groups Procedures Manual is to provide a standardized set of procedures documenting in an auditable manner the activities performed by the Pollutant Assessments Group (PAG) of the Health and Safety Research Division (HASRD) of the Environmental Measurements and Applications Section (EMAS) at Oak Ridge National Laboratory (ORNL). The Procedures Manual ensures that the organizational, administrative, and technical activities of PAG conform properly to protocol outlined by funding organizations. This manual also ensures that the techniques and procedures used by PAG and other contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards. The Procedures Manual is sufficiently comprehensive for use by PAG and contractor personnel in the planning, performance, and reporting of project activities and measurements. The Procedures Manual provides procedures for conducting field measurements and includes program planning, equipment operation, and quality assurance elements. Successive revisions of this manual will be archived in the PAG Document Control Department to facilitate tracking of the development of specific procedures.

Not Available

1992-03-01T23:59:59.000Z

457

Optimization of proteomic sample preparation procedures for comprehens...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

procedures for comprehensive protein characterization of pathogenic systems. Optimization of proteomic sample preparation procedures for comprehensive protein...

458

Refined Cauchy and Littlewood identities, plane partitions and symmetry classes of alternating sign matrices  

E-Print Network [OSTI]

We prove and conjecture some new symmetric function identities, which equate the generating series of 1. Plane partitions, subject to certain restrictions and weightings, and 2. Alternating sign matrices, subject to certain symmetry properties. The left hand side of each of our identities is a simple refinement of a relevant Cauchy or Littlewood identity, allowing them to be interpreted as generating series for plane partitions. The right hand side of each identity is a partition function of the six-vertex model, on a relevant domain. These can be interpreted as generating series for alternating sign matrices, using the well known bijection with six-vertex model configurations.

Dan Betea; Michael Wheeler

2014-05-30T23:59:59.000Z

459

Reservoir vital signs monitoring, 1991: Physical and chemical characteristics of water and sediment  

SciTech Connect (OSTI)

In the second year of TVA's Reservoir Vital signs Monitoring program, physical/chemical measurements of water and sediment were made on fourteen TVA reservoirs (the nine mainstem Tennessee river reservoirs - Kentucky through Fort Loudoun and five tributary reservoirs - Cherokee, Douglas, Norris, Melton Hill and Tellico). In addition in 1991, limited water quality monitoring was initiated on ten tributary storage impoundments. The objective of the Vital Signs monitoring program is to assess the health or integrity of these aquatic ecosystems. Physical/chemical data collected in 1991 showed the water quality of the majority of TVA's reservoirs to be very good, but pointed out areas for improvement and further investigation.

Meinert, D.L.; Fehring, J.P.

1992-07-01T23:59:59.000Z

460

Zeros, Dips and Signs in pp and p$\\rm\\bf\\bar p$ Elastic Amplitudes  

E-Print Network [OSTI]

The dips observed in the differential cross sections of elastic pp and p$\\bar{\\rm p}$ scattering are studied in terms of the locations of the zeros of the real and imaginary parts of the amplitude and of the sign of real part at large $|t|$. It is confirmed that the differences in shapes of the dips in the pp and p$\\bar{\\rm p}$ systems are determined by a change of sign of the real tail, which seems to be determined by perturbative QCD contributions.

Flavio Pereira; Erasmo Ferreira

1999-07-19T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Search for Physics Beyond the Standard Model in Opposite-Sign Dilepton Events at sqrt(s) = 7 TeV  

SciTech Connect (OSTI)

A search is presented for physics beyond the standard model (SM) in final states with opposite-sign isolated lepton pairs accompanied by hadronic jets and missing transverse energy. The search is performed using LHC data recorded with the CMS detector, corresponding to an integrated luminosity of 34 inverse picobarns. No evidence for an event yield beyond SM expectations is found. An upper limit on the non-SM contribution to the signal region is deduced from the results. This limit is interpreted in the context of the constrained minimal supersymmetric model. Additional information is provided to allow testing the exclusion of specific models of physics beyond the SM.

Chatrchyan, S. [Yerevan Physics Institute (Armenia); et al.,

2011-06-01T23:59:59.000Z

462

UC Davis Policy and Procedure Manual Introduction  

E-Print Network [OSTI]

UC Davis Policy and Procedure Manual Introduction Development and Management of Campus Sections Exhibit B, Policy Development Best Practices Exhibit C, New Policy Development Plan Exhibit D of the Chancellor and Provost Source Document: N/A 1 of 5 Exhibit A, Structure for Policy and Procedure Manual

California at Davis, University of

463

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

procedures for disposal of hazardous and/or radioactive wastes are to be followed. P-33 waste shouldSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: P-33://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

464

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: H-3://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

465

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

procedures for disposal of hazardous and/or radioactive wastes are to be followed. Cr-51 waste shouldSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Cr-51://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

466

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

through ingestion is 0.6 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactiveSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: P-32://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

467

Safe Operating Procedure (Revised 9/10)  

E-Print Network [OSTI]

ingestion is 0.04 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Revised 9/10) SAFETY PROTOCOL: I-125://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

468

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

ingestion is 9.0 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Fe-55://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

469

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

ingestion is 6 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: S-35://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

470

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

.4 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Na-22://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

471

Safe Operating Procedure SAFETY PROTOCOL: Rb-86  

E-Print Network [OSTI]

of hazardous and/or radioactive wastes are to be followed. Rb- 86 waste should be segregated from all otherSafe Operating Procedure (2/10) SAFETY PROTOCOL: Rb-86 this safety protocol or submit an alternative and equivalent procedure that you develop to meet your unique

Farritor, Shane

472

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

through ingestion is 10 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactiveSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Se-75://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

473

Safe Operating Procedure (Reviewed 7/09)  

E-Print Network [OSTI]

of intake through ingestion is 0.8 mCi. Waste Disposal EHS procedures for disposal of hazardous andSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Fe-59://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

Farritor, Shane

474

Spills of Radioactive Materials -Emergency Procedures  

E-Print Network [OSTI]

to radioactive waste container. For surface decontamination, use soap and water and cleansers appropriateSpills of Radioactive Materials - Emergency Procedures Procedure: 7.53 Created: 1/16/2014 Version for injured personnel. B. Applicability/scope This policy applies to all facilities where radioactive

Jia, Songtao

475

ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES  

E-Print Network [OSTI]

ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES Chapter 1 POLICY DEVELOPMENT & IMPLEMENTATION................................................................................. 3 #12;ADMINISTRATION AND FINANCE POLICIES AND PROCEDURES Chapter 1 POLICY DEVELOPMENT & IMPLEMENTATION Revision Date: 1/26/10 1.01 PURPOSE AND USE OF THE MANUAL This Administration and Finance Policies

Rusu, Adrian

476

Safe Operating Procedure (Created 5/11)  

E-Print Network [OSTI]

://ehs.unl.edu (5/11) LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT: WRITTEN PROCEDURES during maintenance and repair operations. In these situations, a lockout/tagout (LO/TO) program must/TO procedures, as well as other program requirements. See EHS SOP, Lockout/Tagout for Machines & Equipment

Farritor, Shane

477

Academic Policies and Procedures Graduate Programs  

E-Print Network [OSTI]

and Graduation Committee. 3. The academic advisor selects three research articles in the student's researchAcademic Policies and Procedures Graduate Programs Policy No. 230 Page 1 Policy No. 230 UNIVERSITY OF PITTSBURGH SCHOOL OF NURSING ACADEMIC POLICIES AND PROCEDURES FOR THE GRADUATE PROGRAM TITLE OF POLICY

Jiang, Huiqiang

478

PUBLIC INTEREST DISCLOSURE (PID) POLICY AND PROCEDURES  

E-Print Network [OSTI]

i PUBLIC INTEREST DISCLOSURE (PID) POLICY AND PROCEDURES #12;PUBLIC INTEREST DISCLOSURE POLICY a disclosure under the PID Act 7 5.2. How to make a disclosure under the PID Act 7 6. PROCEDURES FOR AUTHORISED OFFICERS 9 7.1. Authorised Officer must provide information about the PID Act 9 7.2. Receiving

Greenslade, Diana

479

HEALTH AND SAFETY PROCEDURES -Major Projects  

E-Print Network [OSTI]

HEALTH AND SAFETY PROCEDURES - Major Projects HEALTH & SAFETY UNIT SPRING 2006 #12;CONTENTS of this document is to provide the University with a summary of the principle activities in construction projects the reliance on physical controls and use of personnel protective equipment. The procedures that consider

480

A diagnostic procedure for multivariate quality control  

E-Print Network [OSTI]

. The proposed diagnostic procedure is triggered by off-target signals from the multivariate control chart. The performance of the procedure are investigate in conjunction with the two control charts, the X2 chart and the MC1 chart. Two performance measures...

Keserla, Adhinarayan A.

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures sign" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

9 TOWARD A MODEL OF ACQUIRING PROCEDURES  

E-Print Network [OSTI]

with procedural text in daily life is that people often do not read it when they should. Although many people called reading to do, where people read in order to carry out some task. The Need for Research on procedural text and also shows the weakness of our current understanding. Do People Read Instructions? One

Kieras, David E.

482

Policy Procedure Administrative Directive Policy No.  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: Policy No.: Effective Date or Date of Last President See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: Background and Purpose: CLEAR DATA #12;Policy *A University Policy is a principle-based statement with broad

Northern British Columbia, University of

483

Procedure Based Help Desk System Akira Takano  

E-Print Network [OSTI]

tools for help desk systems have become available [1]. When a help desk system is developed by usingProcedure Based Help Desk System Akira Takano Information Technology R&D Center Mitsubishi Electric kanae@isl.melco.co.jp ABSTRACT In this paper, we describe an outline of "Procedure based help desk

484

Colorado School of Mines Service Center Procedures  

E-Print Network [OSTI]

will usually develop and incorporate its own indirect cost rate in order to recover utilities, space School of Mines Service Center Procedures - 2 - I. PURPOSE CSM conducts research under Government sponsored awards. Therefore, service center procedures must reflect government regulatory costing principles

485

Procedures for Preparing the Research Project Proposal (Revised: March 5, 2010) 1 PROCEDURES FOR A PROJECT  

E-Print Network [OSTI]

FOR A PROJECT: for the Master of Science in Human-Computer InteractionProcedures for Preparing the Research Project Proposal (Revised: March 5, 2010) 1 PROCEDURES the Research Project Proposal (Revised: March 5, 2010) 2 Contents HCI GRADUATE FACULTY

Zhou, Yaoqi

486

Component evaluation testing and analysis algorithms.  

SciTech Connect (OSTI)

The Ground-Based Monitoring R&E Component Evaluation project performs testing on the hardware components that make up Seismic and Infrasound monitoring systems. The majority of the testing is focused on the Digital Waveform Recorder (DWR), Seismic Sensor, and Infrasound Sensor. In order to guarantee consistency, traceability, and visibility into the results of the testing process, it is necessary to document the test and analysis procedures that are in place. Other reports document the testing procedures that are in place (Kromer, 2007). This document serves to provide a comprehensive overview of the analysis and the algorithms that are applied to the Component Evaluation testing. A brief summary of each test is included to provide the context for the analysis that is to be performed.

Hart, Darren M.; Merchant, Bion John

2011-10-01T23:59:59.000Z

487

Laser damage testing of small optics for the National Ignition Facility  

SciTech Connect (OSTI)

A damage test procedure was established for optical components that have large incident beam footprints. The procedure was applied on coated samples for a high-powered 1053-nm, 3-ns pulse-length laser system.

Chow, Robert; Runkel, Mike; Taylor, John R

2005-06-10T23:59:59.000Z

488

\\\\files.umn.edu\\DRS\\Shared\\Departmental Information\\Policies and Procedures Policies and Procedures  

E-Print Network [OSTI]

1 \\\\files.umn.edu\\DRS\\Shared\\Departmental Information\\Policies and Procedures Policies and Procedures Manual 2013-2014 (Updated 10/13) #12;2 Table of Contents General Policies 4 - 5 Appropriate User Groups Locker Rooms Climbing Wall 28 Court Sports 29-30 Participation Reservation Procedures #12

Amin, S. Massoud

489

Appendix A: Committee on Student Conduct Hearing Procedures Committee on Student Conduct Hearing Procedures  

E-Print Network [OSTI]

Appendix A: Committee on Student Conduct Hearing Procedures Committee on Student Conduct Hearing Procedures A. Introduction B. Parties to the Complaint C. Committee and Panels D. Cases of Physical. For the purpose of these procedures, the parties are identified as the University presenter and the accused

Amin, S. Massoud

490

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc Complete Policy Title: Duplicate and Replacement Parchments, Diplomas and Certificates Procedures Policy Number (if applicable): Approved by: Senate Date of Most Recent Approval: March 14, 2007

Haykin, Simon

491

Vehicle Maintenance Procedure Outline the procedure for vehicle maintenance at University of Michigan (U-M).  

E-Print Network [OSTI]

Vehicle Maintenance Procedure Objective Outline the procedure for vehicle maintenance at University of Michigan (U-M). Procedure 1. Your U-M vehicle has a mechanical and/or safety issue. 2. Contact Garage of the vehicle or if needed, have the vehicle towed to the maintenance facility. 4. If a loaner is needed while

Kirschner, Denise

492

Propagation testing multi-cell batteries.  

SciTech Connect (OSTI)

Propagation of single point or single cell failures in multi-cell batteries is a significant concern as batteries increase in scale for a variety of civilian and military applications. This report describes the procedure for testing failure propagation along with some representative test results to highlight the potential outcomes for different battery types and designs.

Orendorff, Christopher J.; Lamb, Joshua; Steele, Leigh Anna Marie; Spangler, Scott Wilmer

2014-10-01T23:59:59.000Z

493

Texas A&M AgriLife Research Procedures 29.01.03.A0.01 Information Resource Procedures  

E-Print Network [OSTI]

Texas A&M AgriLife Research Procedures 29.01.03.A0.01 Information Resource Procedures Approved, 2011 August 24, 2012 Next Scheduled Review: August 24, 2014 Texas A&M AgriLife Research Procedures 29.01.03.A0.01 Information Resource Procedures Page 1 of 19 PROCEDURE STATEMENT This procedure establishes

494

Operability test report for K east basin canister cleaning system  

SciTech Connect (OSTI)

This document summarizes test data computed during the operability test procedure for the K East Basin Canister Cleaning System. Test Results show that the canister cleaning system successfully lowered the dose of each canister tested so that each canister could be disposed of as low level waste.

Crystal, J.B.

1997-01-09T23:59:59.000Z

495

Dalhousie University Sustainable Procurement Checklist Dalhousie University (Halifax, NS) has a signed Sustainability Policy and Statement of Principles. Our  

E-Print Network [OSTI]

Dalhousie University Sustainable Procurement Checklist Dalhousie University (Halifax, NS) has a signed Sustainability Policy and Statement of Principles. Our Procurement Policy reflects the importance of sustainability considerations

Brownstone, Rob

496

United States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security  

Broader source: Energy.gov [DOE]

U.S. Secretary of Energy Ernest Moniz and Director General of the Russian Federation State Corporation “Rosatom” Sergey Kirienko today signed the Agreement between the Government of the United States of America and the Government of the Russian Federation on Cooperation in Nuclear- and Energy-Related Scientific Research and Development

497

TERMINATION FORM Send complete, signed form to your Human Resources Services Area Office  

E-Print Network [OSTI]

TERMINATION FORM Send complete, signed form to your Human Resources Services Area Office HR/ REV1.8/2007/12/11 A EMPLOYEE INFORMATION Employee ID First Name & Initial(s) Surname Effective Date of Termination (dd for Current Benefit Year Reason for Termination Comments B AUTHORIZATION Department Ext. Name Signature Date

Haykin, Simon

498

Sign Lighting Overview Page 7-1 2008 Nonresidential Compliance Manual July 2010  

E-Print Network [OSTI]

.1 Overview The Sign Lighting Standards conserve energy, reduce peak electric demand, and are technically feasible and cost effective. They set minimum control requirements, maximum allowable power levels and minimum efficacy requirements. 7.1.1 History and Background Regulations for lighting have been in effect

499

On Products and Line Graphs of Signed Graphs, their Eigenvalues and Energy  

E-Print Network [OSTI]

On Products and Line Graphs of Signed Graphs, their Eigenvalues and Energy K.A. Germina, Shahul and Laplacian matrices and their eigenvalues and energies of the general product (non-complete extended p- sum product and the eigenvalues and energy of the product in terms of those of the factor graphs

Zaslavsky, Thomas

500

J Sign Process Syst DOI 10.1007/s11265-012-0667-5  

E-Print Network [OSTI]

proposed that trade-off power consumption and quality. They primar- ily focus on discrete cosine transformJ Sign Process Syst DOI 10.1007/s11265-012-0667-5 Quality-Aware Techniques for Reducing Power of bit truncation and voltage overscaling to reduce the power consumption of JPEG codecs. Both techniques

Kambhampati, Subbarao