Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria  

SciTech Connect (OSTI)

This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

2011-08-01T23:59:59.000Z

2

Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Energy Simulation Test for Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria Ron Judkoff, Ben Polly, and Marcus Bianchi National Renewable Energy Laboratory Joel Neymark J. Neymark & Associates Mike Kennedy Mike D. Kennedy, Inc. Link to Accompanying Zipped Data Files (3.9 MB) This document is intended for use with the following documents: Building Energy Simulation Test for Existing Homes (BESTEST-EX), NREL/TP-550-47427 Example Procedures for Developing Acceptance-Range Criteria for BESTEST-EX, NREL/TP-550-47502 Technical Report NREL/TP-5500-52414 August 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy

3

Building Technologies Office: Current Test Procedure Waivers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test Procedure Test Procedure Waivers to someone by E-mail Share Building Technologies Office: Current Test Procedure Waivers on Facebook Tweet about Building Technologies Office: Current Test Procedure Waivers on Twitter Bookmark Building Technologies Office: Current Test Procedure Waivers on Google Bookmark Building Technologies Office: Current Test Procedure Waivers on Delicious Rank Building Technologies Office: Current Test Procedure Waivers on Digg Find More places to share Building Technologies Office: Current Test Procedure Waivers on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Current Rulemakings & Notices Test Procedure Waivers Recent Federal Register Notices How to Participate or Comment

4

OPERATING PROCEDURES TO IMPLEMENT THE COLLEGE OF CHARLESTON POLICY ON ALCOHOL AND ILLICIT DRUG TESTING  

E-Print Network [OSTI]

for developing the annual list of employee positions that will be subject to such testing. (a) Not later than May Positions. (b) The DER and the Director shall evaluate the lists provided to determine if each designated AND ILLICIT DRUG TESTING THE LANGUAGE USED IN THIS DOCUMENT DOES NOT CREATE AN EMPLOYMENT CONTRACT BETWEEN

Kasman, Alex

5

Federal Agency NEPA Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

Agency NEPA Implementing Procedures Agency NEPA Implementing Procedures Note: Some Departments' agencies have their own NEPA implementing procedures. To access Department-wide NEPA implementing procedures, click on the name of the Federal Department. To access NEPA implementing procedures for Department's agencies, click on the provided links. Department/ Agency: Division: Link: Department of Agriculture Agricultural Research Service http://www.ecfr.gov/cgi- in/text- idx?c=ecfr&SID=47c103e07fd64e933c7f74c 4b3c4ac9a&rgn=div5&view=text&node=7:6. 1 2 1 8&id 7 Animal and Plant Health Inspection Service http://www.ecfr.gov/cgi-bin/text- idx?c=ecfr&SID=47c103e07fd64e933c7f74c 4b3c4ac9a&rgn=div5&view=text&node=7:5. 1.1.1.21&idno=7 Farm Service Agency http://www.ecfr.gov/cgi-bin/text-

6

Building Technologies Office: Standards and Test Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Standards and Test Standards and Test Procedures to someone by E-mail Share Building Technologies Office: Standards and Test Procedures on Facebook Tweet about Building Technologies Office: Standards and Test Procedures on Twitter Bookmark Building Technologies Office: Standards and Test Procedures on Google Bookmark Building Technologies Office: Standards and Test Procedures on Delicious Rank Building Technologies Office: Standards and Test Procedures on Digg Find More places to share Building Technologies Office: Standards and Test Procedures on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR® Popular Links Success Stories Previous Next Lighten Energy Loads with System Design. Learn More.

7

UCSD Implementing Procedures 36/Classification of Positions  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1) 36/Classification of Positions I. REFERENCES AND RELATED POLICIES A. UCSD Implementing Procedures 20 ­ Recruitment B. UC PPSM 36 - Classification of Positions C shall be obtained prior to any commitment to the concerned individual. III. PROCEDURES A. New

Tsien, Roger Y.

8

New Mexico Antidegradation Policy Implementation Procedure |...  

Open Energy Info (EERE)

Implementation Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: New Mexico Antidegradation Policy...

9

Rough Ride Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NTP005 NTP005 Revision 2 Effective December 1, 2004 Electric Vehicle Rough Road Course Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: _______________ Donald B. Karner ©2004 Electric Transportation Applications All Rights Reserved Procedure ETA-NTP005 Revision 2 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Testing Activity Requirements 6 6.0 Glossary 12 7.0 References 14 Appendices Appendix A - Electric Vehicle Rough Road Test Data Sheet 15

10

UCSD Implementing Procedures Effective Date: July 1, 1996 Page 1  

E-Print Network [OSTI]

UCSD Implementing Procedures (HR-S-1/Definitions of Terms B. UCSD Implementing Procedures 14/Affirmative Action C. UCSD Implementing Procedures 23/Performance Appraisal D. UC PPSM 30/Salary E. UCSD Implementing Procedures 30/Salary Equity Increase

Tsien, Roger Y.

11

UC Santa Barbara Policy and Procedure Implementing Procedures for the Whistleblower Policy  

E-Print Network [OSTI]

UC Santa Barbara Policy and Procedure Implementing Procedures for the Whistleblower Policy Contact: 8 Implementing Procedures for the Whistleblower Policy I. Purpose and Scope UC Santa Barbara's implementing procedure for the University of California Policy for Reporting and Investigating Allegations

Sideris, Thomas C.

12

NEPA Implementation Procedures: Appendices I, II, and III | Department...  

Broader source: Energy.gov (indexed) [DOE]

Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III These appendices were prepared by the Council on Environmental...

13

Test Procedure Conducted Energy Weapons  

E-Print Network [OSTI]

Test Procedure for Conducted Energy Weapons Version 1.1 2010/07/31 #12;Contents Page 0.0 Disclaimer A TASER M26 13 Appendix B TASER X26 23 #12;1 Test Procedure for Conducted Energy Weapons 0.0 Disclaimer Energy Weapons ("CEWs") in a controlled and repeatable manner across jurisdictions. The consistent

Adler, Andy

14

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: _________ Roberta Brayer Approved by: _________________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP06 Revision 2 i TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Initial Conditions and Prerequisites 1 5. Testing Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices Appendix A - Handling Pad Test Data Sheet 8

15

Standards and Test Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance & Equipment Standards Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain...

16

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Revision 1 Effective June 2008 Battery Capacity and Depth of Discharge Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP003 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

17

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 Revision 1 Effective June 2008 Traction System Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP002 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

18

EV America Skid Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 Revision 1 Effective June 2008 Electromagnetic Interference and Susceptibility Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP004 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

19

Reporting Cooperating Agencies in Implementing the Procedural Requirements  

Broader source: Energy.gov (indexed) [DOE]

Reporting Cooperating Agencies in Implementing the Procedural Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). REPORTING COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT More Documents & Publications Cooperating Agencies in Implementing the Procedural Requirements of the

20

Reporting Cooperating Agencies in Implementing the Procedural Requirements  

Broader source: Energy.gov (indexed) [DOE]

Reporting Cooperating Agencies in Implementing the Procedural Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act The purpose of this Council on Environmental Quality Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA). REPORTING COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT More Documents & Publications Cooperating Agencies in Implementing the Procedural Requirements of the

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

12.02 Institutional Procedures for Implementing Tenure Page 1 of 3 12.02 Institutional Procedures for Implementing Tenure  

E-Print Network [OSTI]

12.02 Institutional Procedures for Implementing Tenure Page 1 of 3 12.02 Institutional Procedures procedures for implementing tenure in accordance with this policy. Reason for Policy This policy provides guidance to system academic institutions in the development of tenure procedures, and the policy also

22

PART 1021-NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES  

Broader source: Energy.gov (indexed) [DOE]

Effective Nov 14, 2011 1 Effective Nov 14, 2011 1 PART 1021-NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Subpart A-General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activities. Subpart B-DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on actions during the NEPA process. 1021.212 Research, development, demonstration, and testing. 1021.213 Rulemaking. 1021.214 Adjudicatory proceedings. 1021.215 Applicant process. 1021.216 Procurement, financial assistance, and joint ventures. Subpart C-Implementing Procedures 1021.300 General requirements. 1021.301 Agency review and public participation.

23

10 CFR 1021 -- National Environmental Policy Act Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

1021 -- NATIONAL 1021 -- NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Subpart A -- General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activities. Subpart B -- DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on actions during the NEPA process. 1021.212 Research, development, demonstration, and testing. 1021.213 Rulemaking. 1021.214 Adjudicatory proceedings. 1021.215 Applicant process. 1021.216 Procurement, financial assistance, and joint ventures. Subpart C -- Implementing Procedures 1021.300 General requirements. 1021.301 Agency review and public participation. 1021.310 Environmental impact statements.

24

US advanced battery consortium in-vehicle battery testing procedure  

SciTech Connect (OSTI)

This article describes test procedures to be used as part of a program to monitor the performance of batteries used in electric vehicle applications. The data will be collected as part of an electric vehicle testing program, which will include battery packs from a number of different suppliers. Most data will be collected by on-board systems or from driver logs. The paper describes the test procedure to be implemented for batteries being used in this testing.

NONE

1997-03-01T23:59:59.000Z

25

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) |  

Broader source: Energy.gov (indexed) [DOE]

NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 64603) DOE amended its regulations governing compliance with the National Environmental Policy Act (NEPA). These amendments incorporate changes primarily related to DOE's power marketing activities, based on DOE's experience in applying the current NEPA regulations. The revised regulations are intended to improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time, while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. 61 Fed Reg 64603: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222)

26

Current Test Procedure Waivers | Department of Energy  

Energy Savers [EERE]

Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim...

27

Identifying Non-Federal Cooperating Agencies in Implementing the Procedural  

Broader source: Energy.gov (indexed) [DOE]

Identifying Non-Federal Cooperating Agencies in Implementing the Identifying Non-Federal Cooperating Agencies in Implementing the Procedural Requirements of NEPA Identifying Non-Federal Cooperating Agencies in Implementing the Procedural Requirements of NEPA The purpose of this Council on Environmental Quality Memorandum is to ensure that all federal and non-federal cooperating agencies are identified on the cover sheet of each Environmental Impact Statement (EIS) prepared by your agency. G-CEQ-IdentnonfedCooperatingAgencies.pdf More Documents & Publications Designation of Non-Federal Agencies as Cooperating Agencies Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Reporting Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act

28

Test Procedure Waivers | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance & Equipment Standards » Rulemakings & Notices » Test Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with the relevant test procedure. For this reason, the Department of Energy (DOE) considers petitions for waivers from test procedures under certain circumstances. In general, any interested party-typically a manufacturer-may submit a petition for a test procedure waiver for a basic model of a covered product

29

Design and implementation of parallel simulation ranking and selection procedures.  

E-Print Network [OSTI]

??Conventional simulation ranking-and-selection(R&S) procedures are designed and implemented for serial computing environment. However, today's growth of computing power relies more on parallelism rather than faster (more)

Wu, Yang

2013-01-01T23:59:59.000Z

30

DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122...  

Broader source: Energy.gov (indexed) [DOE]

57 Fed Reg 15122) DOE NEPA Implementing Procedures: Final Rule (57 Fed Reg 15122) DOE revised the existing rule at 10 CFR part 1021, titled "Compliance with the National...

31

Building Technologies Office: Current Test Procedure Waivers  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test Procedure Waivers Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This table lists all waivers to test procedures that DOE has granted and that are still in effect. The links to the notices provide access to the dockets in Regulations.gov, which contain all notices and public comments. For more information, please email: AS_Waiver_Requests@ee.doe.gov The links to the notices provides access to the docket in regulations.gov, which contains all notices and public comments.

32

CONTROL VALVE TESTING PROCEDURES AND EQUATIONS  

E-Print Network [OSTI]

APPENDIX A CONTROL VALVE TESTING PROCEDURES AND EQUATIONS FOR LIQUID FLOWS #12;APPENDIX A CONTROL VALVE TESTING PROCEDURES AND EQUATIONS FOR LIQUID FLOWS 2 Cv Q P Sg net gpm net = / Cv = Q P / Sg 75 in this report is per Instrument Society of America S39.2 testing specifications for control valves. The main

Rahmeyer, William J.

33

Standards and Test Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Standards and Test Procedures Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain appliances and equipment, and currently covers more than 50 different products. Authority to undertake this effort was granted by Congress, and DOE follows a four phase process when reviewing existing and developing new standards. Each Product page provides information on recent updates, current standards and test procedures, waivers, exceptions, and exemptions, statutory authority, and historical information. For information on current Rulemakings, visit Current Rulemaking and Notices. Consumer Products Battery Chargers and External Power Supplies Ceiling Fans Central Air Conditioners and Heat Pumps Clothes Dryers

34

J1634 SAE BEV Test Procedures  

Broader source: Energy.gov (indexed) [DOE]

J1634 SAE BEV Test Procedures 2010 DOE Hydrogen Program and Vehicle Technologies Annual Merit Review June 09, 2010 Michael Duoba Argonne National Laboratory Sponsored by Lee Slezak...

35

Reference Manual and Procedures for Implementation of PURPA Standards in  

Broader source: Energy.gov (indexed) [DOE]

EPACT 2005 (March 2006) EPACT 2005 (March 2006) Reference Manual and Procedures for Implementation of PURPA Standards in EPACT 2005 (March 2006) This reference manual is intended to be used as an aid to state commissions and utilities as they consider the new federal standards that are part of the Energy Policy Act of 2005 (Subtitle E, "Amendments to PURPA," sections 1251, 1252, and 1254). It summarizes state commission and unregulated utility requirements and covers implementation procedures and issues to be considered. Manual for Implementation of PURPA Standards in EPACT 2005 (March 2006).pdf More Documents & Publications Reference Manual and Procedures for Implementation of PURPA Standards in EISA 2007 REPORT TO CONGRESS ON COMPETITION IN WHOLESALE AND RETAIL MARKETS FOR

36

Reference Manual and Procedures for Implementation of PURPA Standards in  

Broader source: Energy.gov (indexed) [DOE]

EISA 2007 EISA 2007 Reference Manual and Procedures for Implementation of PURPA Standards in EISA 2007 This reference manual is intended to be used as an aid to state commissions and utilities as they consider the new federal standards that are part of the Energy Independence and Security Act of 2007 (or EISA, sections 374, 531, 532, and 1307). It summarizes state commission and unregulated utility requirements, covers implementation procedures and issues to be considered, and defines and discusses the new standards. Manual for Implementation of PURPA Standards in EISA 2007 (August 2008).pdf More Documents & Publications Reference Manual and Procedures for Implementation of PURPA Standards in EPACT 2005 (March 2006) Demand Response and Smart Metering Policy Actions Since the Energy Policy

37

DOE Seeks Comment on Application of Clothes Washer Test Procedure |  

Broader source: Energy.gov (indexed) [DOE]

Application of Clothes Washer Test Procedure Application of Clothes Washer Test Procedure DOE Seeks Comment on Application of Clothes Washer Test Procedure June 30, 2010 - 3:02pm Addthis Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer a warm rinse option that is not included in the recommended cycle for washing cotton or linen clothes. The Department is soliciting feedback from the public on the draft interpretive rule, which is available here, until July 30, 2010. Addthis Related Articles Save Energy and More with ENERGY STAR. ENERGY STAR clothes washers use 50% less energy to wash clothes than standard washing machines. Tips: Laundry DOE Solicits Views on the Implementation of Large-Capacity Clothes Washer

38

NEPA Implementation Procedures: Appendices I, II, and III | Department of  

Broader source: Energy.gov (indexed) [DOE]

NEPA Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III NEPA Implementation Procedures: Appendices I, II, and III These appendices are intended to improve public participation and facilitate agency compliance with the National Environmental Policy Act (NEPA) and the Council on Environmental Quality's NEPA Regulations, the last version appeared in the Federal Register of Friday, December 21,1984 (49 FR 49754). Note: The specfic contact information is outdated and should not be used for consultation or outreach. Appendix I - Federal and Federal-State Agency NEPA Contacts Appendix II - Federal and Federal- State Agencies With Jurisdiction by Law or Special Expertise on Environmental Quality Issues Appendix III - Federal and Federal-State Agency Offices for

39

NEPA Implementation Procedures; Appendices I, II, and III  

Broader source: Energy.gov (indexed) [DOE]

_ _ _ _ _ _ _ _ ~ - Friday December 21, 1984 DOE Note: Some contact information may be outdated. Refer to the current edition of Directory o f Potential Stakeholders for Department of Energy Actions under the National Environmental Policy Act (updated annually). Part 11 Council on Environmental Quality 40 CFR Ch. V National Environmental Policy Act (NEPA) Implementation Procedures; Appendices I, II, and 111; Final Rule 49750 Federal Register I Vol. 49, No. 247 / Friday, December 21, 1984 I Rules and Regulations COUNCIL ON ENVIRONMENTAL QUALITY 40 CFRCh. V National Envircnmental Policy Act (NEPA) Implementation Procedures; Appendices I, I!, and lli AGENCY: Council on Environmental Quality, Executive Office of the President. ACTION: Appendices to regulations,

40

10 CFR Part 1021 National Environmental Policy Act Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

21 21 Tuesday July 9, 1996 Part IV Department of Energy 10 CFR Part 1021 National Environmental Policy Act Implementing Procedures; Final Rule 36222 Federal Register / Vol. 61, No. 132 / Tuesday, July 9, 1996 / Rules and Regulations DEPARTMENT OF ENERGY 10 CFR Part 1021 RIN 1901-AA67 National Environmental Policy Act Implementing Procedures AGENCY: Department of Energy. ACTION: Final rule. SUMMARY: The Department of Energy (DOE) is amending its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994.

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) |  

Broader source: Energy.gov (indexed) [DOE]

61 Fed Reg 36222) 61 Fed Reg 36222) DOE NEPA Implementing Procedures: Final Rule (61 Fed Reg 36222) DOE amended its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The amendments incorporate changes that improve DOE's efficiency in implementing NEPA requirements by reducing costs and preparation time while maintaining quality, consistent with the DOE Secretarial Policy Statement on NEPA issued in June 1994. These amendments also incorporate changes necessary to conform to recent changes in DOE's missions, programs, and policies that have evolved in response to changing national priorities since the current regulations were issued in 1992. 61 Fed Reg 36222: DOE NEPA Implementing Procedures-Final Rule More Documents & Publications

42

Implementation Guidance, Drug Testing - December 3, 2007 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 December 3, 2007 Implementation guidance for applicants for, and...

43

Diesel generator trailer acceptance test procedure  

SciTech Connect (OSTI)

This Acceptance Test Procedure (ATP) will document compliance with the requirements of WHC-S-0252 Rev. 1 and ECNs 609271, and 609272. The equipment being tested is a 150KW Diesel Generator mounted on a trailer with switchgear. The unit was purchased as a Design and Fabrication procurement activity. The ATP was written by the Seller and will be performed by the Seller with representatives of the Westinghouse Hanford Company witnessing the test at the Seller`s location.

Kostelnik, A.J.

1994-09-23T23:59:59.000Z

44

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

45

Reporting Cooperating Agencies in Implementing the Procedural Requirements of NEPA  

Broader source: Energy.gov (indexed) [DOE]

3, 2004 3, 2004 MEMORANDUM FOR THE HEADS OF FEDERAL AGENCIES FROM: JAMES L. CONNAUGHTON SUBJECT: REPORTING COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT The January 30, 2002, Memorandum for Heads of Federal Agencies, Subject: Cooperating Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act 1 , consistent with the President's commitment to increase local participation and facilitate cooperative conservation, established a reporting requirement for all EISs and EAs. The purpose of this Memorandum is to establish a revised report to ensure that all Federal agencies are consistently reporting designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National

46

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

47

Argonne Facilitation of PHEV Standard Testing Procedure (SAE...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711) Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711) 2009 DOE Hydrogen Program and Vehicle...

48

ENERGY STAR Test Procedures and Verification | Department of...  

Energy Savers [EERE]

Appliance & Equipment Standards ENERGY STAR ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the...

49

Test Procedure for UV Weathering Resistance of Backsheet | Department...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedure for UV Weathering Resistance of Backsheet Test Procedure for UV Weathering Resistance of Backsheet Presented at the PV Module Reliability Workshop, February 26 - 27...

50

2014-10-14 Issuance: Test Procedures Correction for Fluorescent...  

Broader source: Energy.gov (indexed) [DOE]

10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp...

51

Meeting Concerning Potential Test Procedures and Energy Conservation...  

Broader source: Energy.gov (indexed) [DOE]

Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation...

52

2014-04-11 Issuance: Test Procedures for Residential Clothes...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking...

53

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for...

54

2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...  

Broader source: Energy.gov (indexed) [DOE]

0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document...

55

Honeywell Modular Automation System Acceptance Test Procedure  

SciTech Connect (OSTI)

The purpose of this Acceptance Test Procedure (ATP) is to verify the operability of the three new furnaces as controlled by the new Honeywell Modular Automation System (MAS). The Honeywell MAS is being installed in PFP to control the three thermal stabilization furnaces in glovebox HA-211. The ATP provides instructions for testing the configuration of the Honeywell MAS at the Plutonium Finishing Plant(PFP). The test will be a field test of the analog inputs, analog outputs, and software interlocks. The interlock test will check the digital input and outputs. Field equipment will not be connected forth is test. Simulated signals will be used to test thermocouple, limit switch, and vacuum pump inputs to the PLUMAS.

STUBBS, A.M.

1999-09-21T23:59:59.000Z

56

CEQ Regulations for Implementing the Procedural Provisions of NEPA  

Broader source: Energy.gov (indexed) [DOE]

Executive Office of the President Executive Office of the President REGULATIONS For Implementing The Procedural Provisions Of The NATIONAL ENVIRONMENTAL POLICY ACT Reprint 40 CFR Parts 1500-1508 (2005) This page is blank (inside front cover) TABLE OF CONTENTS PART 1500-PURPOSE, POLICY AND MANDATE Sec. 1500.1 Purpose. 1500.2 Policy. 1500.3 Mandate. 1500.4 Reducing paperwork. 1500.5 Reducing delay. 1500.6 Agency authority. PART 1501-NEPA AND AGENCY PLANNING Sec. 1501.1 Purpose. 1501.2 Apply NEPA early in the process. 1501.3 When to prepare an environmental assessment. 1501.4 Whether to prepare an environmental impact statement. 1501.5 Lead agencies. 1501.6 Cooperating agencies. 1501.7 Scoping. 1501.8 Time limits. PART 1502-ENVIRONMENTAL IMPACT STATEMENT Sec. 1502.1 Purpose. 1502.2 Implementation. 1502.3 Statutory requirements for statements.

57

Cooperating Agencies in Implementing the Procedural Requirements of NEPA  

Broader source: Energy.gov (indexed) [DOE]

30, 2002 30, 2002 MEMORANDUM FOR THE HEADS OF FEDERAL AGENCIES FROM: JAMES CONNAUGHTON Chair SUBJECT: COOPERATING AGENCIES IN IMPLEMENTING THE PROCEDURAL REQUIREMENTS OF THE NATIONAL ENVIRONMENTAL POLICY ACT The purpose of this Memorandum is to ensure that all Federal agencies are actively considering designation of Federal and non-federal cooperating agencies in the preparation of analyses and documentation required by the National Environmental Policy Act (NEPA), and to ensure that Federal agencies actively participate as cooperating agencies in other agency's NEPA processes. 1 The CEQ regulations addressing cooperating agencies status (40 C.F.R. §§ 1501.6 & 1508.5) implement the NEPA mandate that Federal agencies responsible for preparing NEPA

58

AEDG Implementation Recommendations: Testing and Balancing | Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing and Balancing Testing and Balancing The Advanced Energy Design Guide (AEDG) for Small Office Buildings, 30% series, seeks to achieve 30% savings over ASHRAE Standard 90.1-1999. This guide focuses on improvements to small office buildings, less than 20,000ft2. The recommendations in this article are adapted from the implementation section of the guide and focus on testing, adjusting, and balancing; heating sources; filters. Publication Date: Sunday, April 13, 2008 air_testing_and_balancing.pdf Document Details Affiliation: DOE BECP Focus: Compliance Building Type: Commercial Code Referenced: ASHRAE Standard 90.1-1999 Document type: AEDG Implementation Recommendations Target Audience: Architect/Designer Builder Contractor Engineer State: All States Contacts Web Site Policies U.S. Department of Energy

59

Factory Acceptance Test Procedure Westinghouse 100 ton Hydraulic Trailer  

SciTech Connect (OSTI)

This Factory Acceptance Test Procedure (FAT) is for the Westinghouse 100 Ton Hydraulic Trailer. The trailer will be used for the removal of the 101-SY pump. This procedure includes: safety check and safety procedures; pre-operation check out; startup; leveling trailer; functional/proofload test; proofload testing; and rolling load test.

Aftanas, B.L. [Westinghouse Hanford Co., Richland, WA (United States)

1994-11-16T23:59:59.000Z

60

Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel Economy Test Fuel Economy Test Procedures and Labeling to someone by E-mail Share Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling on Facebook Tweet about Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling on Twitter Bookmark Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling on Google Bookmark Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling on Delicious Rank Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling on Digg Find More places to share Alternative Fuels Data Center: Fuel Economy Test Procedures and Labeling on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel Economy Test Procedures and Labeling

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Test Procedure Development and Revision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Test Procedure Development and Revision Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how to measure and calculate the energy efficiency and/or energy use of each appliance. Test procedures also specify how to calculate an estimate of an appliance's annual operating cost, which is used on the EnergyGuide label as required by the Federal Trade Commission.

62

CRAD, System Operating Test Procedures - October 23, 2014 (EA...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

63

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...  

Office of Environmental Management (EM)

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The...

64

DOE Publishes Final Rule for Television Test Procedure | Department...  

Broader source: Energy.gov (indexed) [DOE]

Television Test Procedure DOE Publishes Final Rule for Television Test Procedure October 25, 2013 - 12:00am Addthis The Department of Energy has published a final rule regarding...

65

DOE Publishes Final Rule for Plumbing Products Test Procedures...  

Broader source: Energy.gov (indexed) [DOE]

Plumbing Products Test Procedures DOE Publishes Final Rule for Plumbing Products Test Procedures October 23, 2013 - 12:00am Addthis The Department of Energy has published a final...

66

J1634 SAE BEV Test Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

J1634 SAE BEV Test Procedures J1634 SAE BEV Test Procedures 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 --...

67

Alternative Fuels Data Center: Biodiesel Quality Testing Procedures  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biodiesel Quality Biodiesel Quality Testing Procedures to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Quality Testing Procedures on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Quality Testing Procedures on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Quality Testing Procedures on Google Bookmark Alternative Fuels Data Center: Biodiesel Quality Testing Procedures on Delicious Rank Alternative Fuels Data Center: Biodiesel Quality Testing Procedures on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Quality Testing Procedures on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Biodiesel Quality Testing Procedures Each biodiesel or other renewable diesel producer, distributor, or importer

68

DOE Publishes Final Rule for Residential Furnace Fan Test Procedure  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans.

69

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...  

Broader source: Energy.gov (indexed) [DOE]

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

70

PROCEDURES FOR ESTABLISHING OR CHANGING IMPLEMENTATION PLANS FOR THE CULTURAL DIVERSITY REQUIREMENT  

E-Print Network [OSTI]

PROCEDURES FOR ESTABLISHING OR CHANGING IMPLEMENTATION PLANS FOR THE CULTURAL DIVERSITY REQUIREMENT with a post baccalaureate program is encouraged, using its own procedures, to evaluate the adequacy of those

Arnold, Jonathan

71

NSF ITR Project General Notes on Trypsin Test Procedure  

E-Print Network [OSTI]

NSF ITR Project Fall 2004 General Notes on Trypsin Test Procedure: Automated performance procedure the assay still work"?) Calculation of the Z' ­ Factor (quality criteria) Manual performance procedure: (Uses/purpose of procedure: Setup a new assay. Use as basis for comparison with automated version

Kaber, David B.

72

Reference Manual and Procedures for Implementation of PURPA Standards...  

Broader source: Energy.gov (indexed) [DOE]

Implementation of PURPA Standards in EISA 2007 REPORT TO CONGRESS ON COMPETITION IN WHOLESALE AND RETAIL MARKETS FOR ELECTRIC ENERGY Department of Energy Data Access and Privacy...

73

DOE Issues Final Appliance Test Procedure Rule | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance Test Procedure Rule Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the foundation for standards that will help bring more energy efficient options to the marketplace and result in energy savings for all Americans," said DOE Assistant Secretary for Energy Efficiency and Renewable Energy Andy Karsner. The final rulemaking, which appears in today's Federal Register, will

74

DOE Launches Public Test Procedure Guidance Website | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Launches Public Test Procedure Guidance Website Launches Public Test Procedure Guidance Website DOE Launches Public Test Procedure Guidance Website July 22, 2010 - 4:14pm Addthis The Department of Energy this week launched a new online database offering guidance on the Department's test procedures for appliances and commercial equipment. The new database will provide a publicly accessible forum for anyone with questions about -- or needing clarification of -- DOE's test procedures. This new online resource will also ensure that all manufacturers and members of the public are equally and immediately aware of the Department's interpretations of its test procedures. The database is available here. The database -- which is searchable by product category -- is designed to enable manufacturers, trade associations, and all other interested members

75

DOE Launches Public Test Procedure Guidance Website | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Public Test Procedure Guidance Website Public Test Procedure Guidance Website DOE Launches Public Test Procedure Guidance Website July 22, 2010 - 4:14pm Addthis The Department of Energy this week launched a new online database offering guidance on the Department's test procedures for appliances and commercial equipment. The new database will provide a publicly accessible forum for anyone with questions about -- or needing clarification of -- DOE's test procedures. This new online resource will also ensure that all manufacturers and members of the public are equally and immediately aware of the Department's interpretations of its test procedures. The database is available here. The database -- which is searchable by product category -- is designed to enable manufacturers, trade associations, and all other interested members

76

Test Procedure for UV Weathering Resistance of Backsheet  

Broader source: Energy.gov (indexed) [DOE]

NREL PVRWS 2013 % 2013 Feb. 27 % Test Procedure for UV Weathering % Resistance of Backsheet % Kusato Hirota, Michiko Tanaka, Takao Amioka, Miki Terada % Toray Industries, Inc. %...

77

How to Make Appliance Standards Work: Improving Energy and Water Efficiency Test Procedures  

E-Print Network [OSTI]

Hill. 1996. Energy test procedures for appliances. EnergyWater Efficiency Test Procedures Jim Lutz, Peter Biermayer,Water Efficiency Test Procedures Jim Lutz, Peter Biermayer,

Lutz, Jim

2012-01-01T23:59:59.000Z

78

Additional Guidance Regarding Application of Current Procedures for Testing  

Broader source: Energy.gov (indexed) [DOE]

Additional Guidance Regarding Application of Current Procedures for Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010. Draft of DOE interpretive rule, which sets out DOE's views on the clothes washer testing procedure described in 10 CFR § 430 Appendix J1, having to do with how to apply the testing procedures to washers with a warm rinse option. This draft interpretive rule represents DOE's interpretation of

79

ENERGY STAR Test Procedures and Verification | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

ENERGY STAR » ENERGY STAR Test ENERGY STAR » ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and revision of all test procedures for products in the ENERGY STAR® program, including those products that are also subject to DOE's Energy Conservation Standards program. As specifications are updated and new products or metrics are added to the ENERGY STAR program, DOE is responsible for developing and revising methods, responding to stakeholder comments, and answering any testing-related questions that arise as a result of the procedures being utilized. To simplify the process for interested parties, more information on the test procedure development for ENERGY STAR products can be found on each of

80

Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)  

SciTech Connect (OSTI)

A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

Baum, Gregory A.

2014-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

E-Print Network 3.0 - acceptance test procedures Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

procedures Search Powered by Explorit Topic List Advanced Search Sample search results for: acceptance test procedures...

82

Approved Test Procedures Version 1.1 Release Notes  

E-Print Network [OSTI]

Approved Test Procedures Version 1.1 Release Notes 1 Change Reason for Change 302.a drugdrug, drug allergy In the Informative Test Description section Added clarification to the example. 302.c Problem List In the Informative Test Description section Added the sentence "The test also

83

Rocky Flats ash test procedure (sludge stabilization)  

SciTech Connect (OSTI)

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

Winstead, M.L.

1995-09-14T23:59:59.000Z

84

57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule | Department  

Broader source: Energy.gov (indexed) [DOE]

57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule 57 Fed Reg 15122: DOE NEPA Implementing Procedures-Final Rule The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). DOE is also revoking its existing NEPA guidelines. This rule incorporates changes required by certain policy initiatives instituted by the Secretary of Energy to facilitate participation of the public and affected states in the NEPA process for proposed DOE actions. The rule also includes a revised and expanded list of typical classes of actions, including categorical

85

Rocky Flats Ash test procedure (sludge stabilization)  

SciTech Connect (OSTI)

Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

Funston, G.A.

1995-06-14T23:59:59.000Z

86

Implementation Guidance, Drug Testing - December 3, 2007 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 Implementation Guidance, Drug Testing - December 3, 2007 December 3, 2007 Implementation guidance for applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) selected for Testing Designated Positions (TDP) As established in his memorandum dated September 14, 2007, the Secretary has determined that applicants for, and holders of, a Department of Energy (DOE) Q or L access authorization (security clearance) will be in Testing Designated Positions (TDP) as specified in DOE Order 3792.3, Drug-Free Federal Workplace Testing Implementation Program, for Federal employees, and Title 10, Code of Federal Regulations, Part 707, Workplace Substance Abuse Programs at DOE Sites, for contractor employees. Accordingly,

87

DOE Seeks Comment on Application of Clothes Washer Test Procedure |  

Broader source: Energy.gov (indexed) [DOE]

Seeks Comment on Application of Clothes Washer Test Procedure Seeks Comment on Application of Clothes Washer Test Procedure DOE Seeks Comment on Application of Clothes Washer Test Procedure June 30, 2010 - 3:02pm Addthis Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer a warm rinse option that is not included in the recommended cycle for washing cotton or linen clothes. The Department is soliciting feedback from the public on the draft interpretive rule, which is available here, until July 30, 2010. Addthis Related Articles DOE Seeks Comment on Definition of Showerhead Save Energy and More with ENERGY STAR. ENERGY STAR clothes washers use 50% less energy to wash clothes than standard washing machines.

88

Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

89

Webinar: Test Procedure for Battery Chargers; Notice of Data Availability  

Broader source: Energy.gov [DOE]

DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774 (May 15, 2014). For more information, please visit...

90

Alternative Fuel Evaluation Program: Alternative Fuel Light Duty Vehicle Project - Data collection responsibilities, techniques, and test procedures  

SciTech Connect (OSTI)

This report describes the data gathering and analysis procedures that support the US Department of Energy`s implementation of the Alternative Motor Fuels Act (AMFA) of 1988. Specifically, test procedures, analytical methods, and data protocols are covered. The aim of these collection and analysis efforts, as mandated by AMFA, is to demonstrate the environmental, economic, and performance characteristics of alternative transportation fuels.

none,

1992-07-01T23:59:59.000Z

91

Implementation and Test of Numerical Optimization  

E-Print Network [OSTI]

performance tests, and it is found that libopti is fast compared to scripting based solutions, and as much in its class. #12;ii #12;Summary (Danish) Målet for denne afhandling er at beskrive dobbelt-dimensional problems, their solution time is very large.[JN00] Because of this, optimization as we know it today did

92

A European Test Procedure for Testing Solar Storage Devices  

Science Journals Connector (OSTI)

For an objective comparison of different storage designs, International standards for testing are required. Results obtained by a European group of experts are discussed. It is concluded that the recommended t...

E. van Galen

1984-01-01T23:59:59.000Z

93

International Comparison of Energy Efficiency Criteria and Test Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

International Comparison of Energy Efficiency Criteria and Test Procedures International Comparison of Energy Efficiency Criteria and Test Procedures in Standards and Labeling Programs for Computer Monitors and Commercial Gas Stoves Title International Comparison of Energy Efficiency Criteria and Test Procedures in Standards and Labeling Programs for Computer Monitors and Commercial Gas Stoves Publication Type Report LBNL Report Number LBNL-6506E Year of Publication 2013 Authors Khanna, Nina, Nan Zhou, David Fridley, and John Romankiewicz Date Published 12/2013 Publisher Lawrence Berkeley National Laboratory Keywords Standards and labeling Abstract This report presents a technical review and comparative analysis of existing and/or proposed international mandatory energy performance standards, and voluntary and mandatory energy efficiency labels and test procedures for two products - computer monitors and commercial gas stoves - being considered for revised and new minimum energy performance standards (MEPS) in China. An overview of the scope of international programs, energy efficiency and other energy-related requirements, description and detailed summary table of criteria and procedures in major test standards are presented. In addition, an estimation of potential energy savings if China were to adopt revised MEPS comparable to international levels is provided for computer monitors. A proposed methodology for estimating potential energy savings based on the European Union experience is provided for commercial gas stoves in the absence of available sales or energy consumption data.

94

Testing, Implementation, and Evolution of Seeding ConceptsA Review  

Science Journals Connector (OSTI)

In this paper, testing, implementation, and evolution of both static and dynamic seeding concepts are reviewed. A brief review of both waterspray and hygroscopic seeding is first presented. This is followed by reviews of static seeding of stable ...

William R. Cotton

1986-12-01T23:59:59.000Z

95

10 CFR Part 1021 National Environmental Policy Act Implementing Procedures - Preamble to Final Rule  

Broader source: Energy.gov (indexed) [DOE]

Regulations Regulations 15122 DEPARTMENT OF ENERGY 10 CFR Part 1021 National Environmental Policy Act Implementing Procedures AGENCY: Department of Energy. ACTION: Final rule. SUMMARY: The Department of Energy (DOE) is revising the existing rule at 10 CFR part 1021, titled "Compliance with the National Environmental Policy Act," to incorporate revised provisions of DOE's Guidelines for Implementing the Procedural Provisions of the National Environmental Policy Act (NEPA). DOE is also revoking its existing NEPA guidelines. This rule incorporates changes required by certain policy initiatives instituted by the Secretary of Energy to facilitate participation of the public and affected states in the NEPA process for proposed DOE actions.

96

Operability test procedure [Tank] 241-SY-101 equipment removal system  

SciTech Connect (OSTI)

The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.

Mast, J.C.

1994-12-08T23:59:59.000Z

97

2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a...

98

2014-03-06 Issuance: Test Procedures for Packaged Terminal Air...  

Broader source: Energy.gov (indexed) [DOE]

3-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking 2014-03-06 Issuance: Test Procedures for...

99

2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...  

Broader source: Energy.gov (indexed) [DOE]

Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental...

100

2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers...  

Broader source: Energy.gov (indexed) [DOE]

1-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed...

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NBSBR 84-2867 Test Procedures for Rating  

E-Print Network [OSTI]

NOMENCLATURE ......... . ....... . ... viii SI CONVERSION FACTORS .... .................. xi 1. INTRODUCTION.S. Department of Energy Oak Ridge. Tennessee 37830 #12;NBSIR 84-2867 TEST PROCEDURES FOR RATING RESIDENTIAL, DC 20234 April 1984 Sponsored by: Oak Ridge National Laboratory U.S. Department of Energy Oak Ridge

Oak Ridge National Laboratory

102

Technical Support Document for the National Environmental Policy Act Implementing Procedures  

Broader source: Energy.gov (indexed) [DOE]

Final Rulemaking, 10 CFR part 1021 Page 1 Final Rulemaking, 10 CFR part 1021 Page 1 Department of Energy Technical Support Document for the National Environmental Policy Act Implementing Procedures Final Rule September 27, 2011 This Technical Support Document and the preambles to the Department of Energy"s (DOE"s) Notice of Proposed Rulemaking (76 FR 214) and final rule provide the supporting basis for the changes being made to DOE"s National Environmental Policy Act (NEPA) Implementing Procedures. In this Technical Support Document, DOE presents each of the changes to its NEPA implementing regulations (10 CFR part 1021, Subparts B, C, and D) and provides supplementary support for the changes. The left column of the table below shows the changes to the existing regulations and the right column provides

103

100 Area soil washing bench-scale test procedures  

SciTech Connect (OSTI)

This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

1993-03-01T23:59:59.000Z

104

(Quality control and nondestructive test procedures for welded products)  

SciTech Connect (OSTI)

The International Institute of Welding is composed of some 600 technical experts from 36 countries. These individuals are divided by talent and personal interest into fifteen separate groups called Commissions, each with its own charter and goals. The title, and by inference the charter, of Commission V is : Quality Control and Quality Assurance of Welded Products. In pursuit of its charter Commission V has several subcommissions engaged in the development of drafts, procedures, and standards. Those documents subsequently considered suitable may be submitted to the International Organization for Standards (ISO), an organization similar to the American Society for Testing Materials, for acceptance as international standards. All ISO Procedures and standards which have been in effect for five years must undergo review by the initiating body. The results from review of five-year-old standards and procedures and the discussion of other documents proposed for international publication are presented.

Childress, C.E.

1990-11-09T23:59:59.000Z

105

Acceptance Test Procedure: SY101 air pallet system  

SciTech Connect (OSTI)

The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

Koons, B.M.

1995-05-30T23:59:59.000Z

106

Residential Clothes Washers Test Procedure Notice of Proposed Rulemaking  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

19:12 Sep 20, 2010 19:12 Sep 20, 2010 Jkt 220001 PO 00000 Frm 00001 Fmt 4717 Sfmt 4717 E:\FR\FM\21SEP2.SGM 21SEP2 srobinson on DSKHWCL6B1PROD with PROPOSALS2 Tuesday, September 21, 2010 Part II Department of Energy 10 CFR Part 430 Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers; Proposed Rule VerDate Mar2010 19:12 Sep 20, 2010 Jkt 220001 PO 00000 Frm 00002 Fmt 4701 Sfmt 4702 E:\FR\FM\21SEP2.SGM 21SEP2 srobinson on DSKHWCL6B1PROD with PROPOSALS2 57556 Federal Register / Vol. 75, No. 182 / Tuesday, September 21, 2010 / Proposed Rules DEPARTMENT OF ENERGY 10 CFR Part 430 [Docket No. EERE-2010-BT-TP-0021] RIN 1904-AC08 Energy Conservation Program for Consumer Products: Test Procedure for Residential Clothes Washers AGENCY: Office of Energy Efficiency and

107

Collector substystem heliostat targeting verification: Test Procedure 116  

SciTech Connect (OSTI)

The objectives of this test procedure are: (1) to demonstrate that the correct heliostat targeting data for the receiver has been incorporated into the Heliostat Array Controllers (HAC) software by visually observing heliostat beams on the receiver; (2) to demonstrate that the HAC Graphics CRT displays the correct aim-point array and corresponding x, y and z target values selected; and (3) to demonstrate the HAC capability to select, control and display up to 20 sets of aimpoint tracking arrays.

Rose, G.R.

1981-08-10T23:59:59.000Z

108

Project W-049H instrument and control Acceptance Test Procedure  

SciTech Connect (OSTI)

The purpose of this Acceptance Test Procedure (ATP) for the Project W-049H, Treated Effluent Disposal Facility, is to verify that the instrument and control systems have been installed in accordance with the design documents and function as required by the project criteria. The instrument and control system includes three operator control stations, modems, and general purpose LAN interface cabinets in the Effluent Treatment Facility control room; two pump stations; disposal station pumping building; and all local control units installed in the fold. Testing will be performed using actual signals when available and simulated signals when actual signals are unavailable.

Carrigan, M.C.

1994-11-16T23:59:59.000Z

109

Drug-Free Federal Workplace Testing Implementation Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order provides guidance and policy for the administration, application and implementation of the DOE Drug-free Federal Workplace Plan and other regulations that facilitate the maintenance of a drug-free Federal workplace through the establishment of programs to test for the use of illegal drugs. Chg 1, dated 8-21-92

1988-07-29T23:59:59.000Z

110

Drug-Free Federal Workplace Testing Implementation Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The subject directive provides requirements and responsibilities for the implementation of a workplace program to test for the use of illegal drugs to facilitate the maintenance of a drug-free Federal workplace. In the course of the revision, the document number will change from DOE O 3792.3 to DOE O 343.1.

2012-12-06T23:59:59.000Z

111

Project W-314 performance mock-up test procedure  

SciTech Connect (OSTI)

The purpose of this Procedure is to assist construction in the pre-operational fabrication and testing of the pit leak detection system and the low point drain assembly by: (1) Control system testing of the pit leak detection system will be accomplished by actuating control switches and verifying that the control signal is initiated, liquid testing and overall operational requirements stated in HNF-SD-W314-PDS-003, ''Project Development Specification for Pit Leak Detection''. (2) Testing of the low point floor drain assembly by opening and closing the drain to and from the ''retracted'' and ''sealed'' positions. Successful operation of this drain will be to verify that the seal does not leak on the ''sealed'' position, the assembly holds liquid until the leak detector actuates and the assembly will operate from on top of the mock-up cover block.

CARRATT, R.T.

1999-06-24T23:59:59.000Z

112

Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.  

SciTech Connect (OSTI)

Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

Tuohig, W. (Honeywell FM& T, Kansas City, MO); Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

2009-02-01T23:59:59.000Z

113

Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Federal Test Procedure Emissions Test Results from Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas Kenneth J. Kelly, Brent K. Bailey, and Timothy C. Coburn National Renewable Energy Laboratory Wendy Clark Automotive Testing Laboratories, Inc. Peter Lissiuk Environmental Research and Development Corp. Presented at Society for Automotive Engineers International Spring Fuels and Lubricants Meeting Dearborn, MI May 6-8, 1996 The work described here was wholly funded by the U.S. Department of Energy, a U.S. government agency. As such, this information is in the public domain, may be copied and otherwise accessed freely, and is not subject to copyright laws. These papers were previously published in hard copy form by the Society of Automotive Engineers, Inc. (Telephone: 412.776.4970; E-mail: publications@sae.org)

114

2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking...

115

2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers...  

Office of Environmental Management (EM)

1-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule This document is a...

116

LED bulbs technical specification and testing procedure for solar home systems  

Science Journals Connector (OSTI)

Abstract The definition of technical specifications and the corresponding laboratory procedures are necessary steps in order to assure the quality of the devices prior to be installed in Solar Home Systems (SHS). To clarify and unify criteria a European project supported the development of the Universal Technical Standard for Solar Home Systems (UTSfSHS). Its principles were to generate simple and affordable technical requirements to be optimized in order to facilitate the implementation of tests with basic and simple laboratory tools even on the same SHS electrification program countries. These requirements cover the main aspects of this type of installations and its lighting chapter was developed based on the most used technology at that time: fluorescent tubes and CFLs. However, with the consolidation of the new LED solid state lighting devices, particular attention is being given to this matter and new procedures are required. In this work we develop a complete set of technical specifications and test procedures that have been designed within the frame of the UTSfSHS, based on an intense review of the scientific and technical publications related to LED lighting and their practical application. They apply to lamp reliability, performance and safety under normal, extreme and abnormal operating conditions as a simple but complete quality meter tool for any LED bulb. These tests have been applied to a group of 14 low-cost direct current LED bulbs and the accomplishment of the proposed requirements is analyzed.

Alfonso Gago Caldern; Luis Narvarte Fernndez; Luis Miguel Carrasco Moreno; Javier Sern Barba

2015-01-01T23:59:59.000Z

117

DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure  

Broader source: Energy.gov [DOE]

The Department of Energy has published a notice of proposed rulemaking regarding test procedures for commercial refrigeration equipment.

118

DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure  

Broader source: Energy.gov [DOE]

The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

119

Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures....

120

Power and Sample Size Determination for a Stepwise Test Procedure for Finding the Maximum Safe Dose  

E-Print Network [OSTI]

Power and Sample Size Determination for a Stepwise Test Procedure for Finding the Maximum Safe Dose This paper addresses the problem of power and sample size calculation for a stepwise multiple test procedure of a compound. A general expression for the power of this procedure is derived. It is used to find the minimum

Tamhane, Ajit C.

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Energy use test procedures for appliances: A case study of Japanese refrigerators  

SciTech Connect (OSTI)

The energy test procedure provides a consistent measurement of refrigerator energy consumption, which can be used by engineers, utility forecasters, and consumers. The U.S. and Japanese test procedures for refrigerators differ significantly, so it is impossible to directly compare the performance of unique features, or even determine which units are more efficient. The energy use of 12 Japanese refrigerators (of which 9 were unique models) were measured under the U.S. DOE energy test procedure and compared to that reported by the manufacturers under the Japanese test procedure. The Japanese refrigerators used substantially more electricity with the DOE test.

Meier, A.K.

1987-06-01T23:59:59.000Z

122

Implementation and testing of a parallel layer peeling algorithm  

E-Print Network [OSTI]

implementation was considered because of the anticipated speedup in the solution of the problem under consideration. The algorithm was implemented on an NCUBE 2 machine, with a total of sixty-four processors. Two variations of the parallel algorithm were...

Gandapur, Tasneem Kausar

2012-06-07T23:59:59.000Z

123

DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures  

Broader source: Energy.gov [DOE]

The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

124

Comparison of Real World Energy Consumption to Models and DOE Test Procedures  

Broader source: Energy.gov [DOE]

This study investigates the real-world energy performance of appliances and equipment as it compares with models and test procedures.

125

A class of nonparametric tests based on multiresponse permutation procedures  

Science Journals Connector (OSTI)

......member of this class and the Kruskal-Wallis test. Simulated power comparisons...other members of the class. Kruskal-Wallis test|Location alternative...member of this class and the Kruskal-Wallis test. Simulated power comparisons......

PAUL W. MIELKE; KENNETH J. BERRY; PETER J. BROCKWELL; JAMES S. WILLIAMS

1981-12-01T23:59:59.000Z

126

ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

127

ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

128

2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

129

2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting  

Broader source: Energy.gov [DOE]

Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting

130

Procedures for Reducing the Size of Coverage-based Test Sets A. Je erson O utt  

E-Print Network [OSTI]

Procedures for Reducing the Size of Coverage-based Test Sets A. Je erson O utt ISSE Department, 4A4@rstcorp.com Abstract This paper addresses the problem of reducing the size of test sets for regression testing and test output inspection. Since regression testing requires the execution of some, and in the worst case, all

Offutt, Jeff

131

Procedures for Reducing the Size of Coveragebased Test Sets A. Jefferson Offutt \\Lambda  

E-Print Network [OSTI]

Procedures for Reducing the Size of Coverage­based Test Sets A. Jefferson Offutt \\Lambda ISSE@rstcorp.com Abstract This paper addresses the problem of reducing the size of test sets for regression testing and test output inspection. Since regression testing requires the execution of some, and in the worst case, all

Offutt, Jeff

132

In-Plane Conductivity Testing Procedures and Results  

Broader source: Energy.gov [DOE]

This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007.

133

A Functional Test Procedure for the improved commissioning of a VAV system  

E-Print Network [OSTI]

In the context of the IEA40 research project, a specification of a Functional Test Procedure was progressively developed using the CA-MET building in Namur as real size test bench for the application and validation of the procedure. The target...

Andre, P.; Lacote, P.; Aparecida Silva, C.; Hannay, J.; Lebrun, J.

2004-01-01T23:59:59.000Z

134

Predictive tools for coolant development: An accelerated aging procedure for modeling fleet test results  

SciTech Connect (OSTI)

The objective of this study was to develop an accelerated aging test (AAT) for conventional and extended life coolants that will predict coolant composition and performance after 100,000 or more miles (160,930 km) of use. The procedure was developed by examining the effects of a series of cooling system metals, their surface area and the amount of each used, test temperature, glycol concentration, and test time on important chemical and physical properties of the test coolant. The chemical and physical properties evaluated included the accumulation of glycol degradation products, the depletion rate of active inhibitors, the pH drop, and the presence of corrosion products in solution. In addition, the test coolant performance was evaluated in ASTM D 1384 and D 4340. The effects of variation in the test procedure on the coolant were compared to actual coolant from extended duration fleet tests. The test procedure selected gave test coolant with composition, physical properties, and performance that compared favorably with the fleet test fluid. The test performance was validated by comparing the properties of a series fluids after this test to corresponding fluids removed from vehicles after extended use. An example of fluid development using this procedure is presented. Further areas of investigation are suggested. It is recommended that the general test procedure be considered for adoption as an ASTM test method for evaluation of the extended performance of fluids in automotive and light duty cooling systems.

Gershun, A.V.; Mercer, W.C. [Prestone Products Corp., Danbury, CT (United States)

1999-08-01T23:59:59.000Z

135

Test procedures help ensure accuracy of orifice meters  

SciTech Connect (OSTI)

Orifice meter measurement with a chart recorder has been a standard in the petroleum industry for years. The meter consists of the plate/tube and recorder, requires minimal maintenance and can accurately measure a wide range of flow rates. It must be routinely tested to ensure sustained accuracy. The orifice meter measures differential pressure, static pressure, and temperature. However, the accuracy of the measurement is only as good as the calibration devices used in the test. A typical meter test consists of meter calibration, orifice plate inspection, quality of gas tests, and documentation (test report) to verify the data. The paper describes 19 steps that a gas technician can follow to conduct a thorough meter test.

Fillman, C.R. [Coastal Flow Measurement, Inc., Houston, TX (United States)

1996-07-01T23:59:59.000Z

136

Tank Monitoring and Control System (TMACS) Acceptance Test Procedure  

SciTech Connect (OSTI)

The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

BARNES, D.A.

2000-06-01T23:59:59.000Z

137

Implementation and Testing of Water Quality Lucy Cheng  

E-Print Network [OSTI]

Student Fellowship Program #12;1 BACKGROUND In Arizona, due the market development of realtime water quality sensors. These sensors are convenient in detecting aspects of the sensors in their implementations, have not been well studied. The water quality sensors

Fay, Noah

138

A class of rank test procedures for censored survival data  

Science Journals Connector (OSTI)

......Ann. Statist. 6, 701- 26. 566 D. P. HARRINGTON AND T. R. FLEMING BRESLOW, N. (1970). A generalized Kruskal-Wallis test for comparing K samples subject to unequal patterns of censorship. Biometrika 57, 579-94. Cox, D. R......

DAVID P. HARRINGTON; THOMAS R. FLEMING

1982-12-01T23:59:59.000Z

139

Testing a Procedure for Automatic Classification of Hydrometeor Types  

Science Journals Connector (OSTI)

Examples of automatic interpretation of polarimetric measurements made with an algorithm that classifies precipitation, from an Oklahoma squall line and a Florida airmass storm are presented. Developed in this paper are sensitivity tests of this ...

Dus?an S. Zrni?; Alexander Ryzhkov; Jerry Straka; Yidi Liu; J. Vivekanandan

2001-06-01T23:59:59.000Z

140

Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards & Labeling Programs for Copy Machines, External Power Supplies, LED Displays, Residential Gas Cooktops and Televisions  

E-Print Network [OSTI]

2012. Overview and Test Procedures AS/NZ 4665 ExternalComparison of Test Procedures and Energy Efficiency CriteriaProcedures

Zheng, Nina

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Design and implementation of nanoscale fiber mechanical testing apparatus  

E-Print Network [OSTI]

The rapid growth in the synthetic manufacturing industry demands higher resolution mechanical testing devices, capable of working with nanoscale fibers. A new device has been developed to perform single-axis tensile tests ...

Brayanov, Jordan, 1981-

2004-01-01T23:59:59.000Z

142

Advanced Control Design for Wind Turbines; Part I: Control Design, Implementation, and Initial Tests  

SciTech Connect (OSTI)

The purpose of this report is to give wind turbine engineers information and examples of the design, testing through simulation, field implementation, and field testing of advanced wind turbine controls.

Wright, A. D.; Fingersh, L. J.

2008-03-01T23:59:59.000Z

143

Design of aircraft noise abatement approach procedures for near-term implementation  

E-Print Network [OSTI]

Advanced aircraft noise abatement approach procedures -- characterized by decelerating, continuous descent approaches using idle thrust, and enabled by flight guidance technologies such as GPS and FMS -- have been shown ...

Ho, Nhut Tan, 1974-

2005-01-01T23:59:59.000Z

144

VERIFICATION TESTING AND DESIGN PROCEDURE FOR FRP GRID REINFORCED CONCRETE SLABS  

E-Print Network [OSTI]

1 VERIFICATION TESTING AND DESIGN PROCEDURE FOR FRP GRID REINFORCED CONCRETE SLABS by Jeffrey J (Civil Engineering) at the UNIVERSITY OF WISCONSIN-MADISON 2009 #12;2 VERIFICATION TESTING AND DESIGN that can be positioned quickly. Initial testing on three dimensional fiber reinforced polymer grids has led

Bank, Lawrence C.

145

2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

146

2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

147

DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

148

E-Print Network 3.0 - alternative test procedures Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Powered by Explorit Topic List Advanced Search Sample search results for: alternative test procedures Page: << < 1 2 3 4 5 > >> 1 6.001, Spring 2006--Recitation 3 1 MASSACHVSETTS...

149

2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

150

2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

151

CRAD, System Operating Test Procedures- October 23, 2014 (EA CRAD 31-05, Rev. 0)  

Broader source: Energy.gov [DOE]

This Criteria Review and Approach Document (EA CRAD 31-05, Rev. 0) provides objectives, criteria, and approaches for reviewing startup testing procedures for installed structures, systems, or components.

152

2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 31, 2014.

153

2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedure amendments for residential clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 11, 2014.

154

Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.  

SciTech Connect (OSTI)

This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

Barnette, Daniel Wayne

2005-10-01T23:59:59.000Z

155

Field tests and new design procedure for laterally loaded drilled shafts in clay  

E-Print Network [OSTI]

FIELD TESTS AND NEW DESIGN PROCEDURE FOR LATERALLY LOADED DRILLED SHAFTS IN CLAY A Thesis by l1ARK WILLIAM BIERSCHWALE Submitted to ihe Graduate College Texas A8M University in partial fulfillment of the requirement for the degree of MASTER... OF SCIENCE December 1980 Major Subject: Civil Engineering FIELD TESTS AND NEW DESIGN PROCEDURE FOR LATERALLY LOADED DRILLED SHAFTS IN CLAY A Thesis by NARK WILLIAM BIERSCHWALE Approved as to style and content by: Harry M. Coyle - Chairman...

Bierschwale, Mark W.

1980-01-01T23:59:59.000Z

156

Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IESNA LM-80-08 - An Overview IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® to someone by E-mail Share Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Facebook Tweet about Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Twitter Bookmark Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Google Bookmark Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Delicious Rank Solid-State Lighting: IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® on Digg Find More places to share Solid-State Lighting: IESNA LM-80-08 -

157

Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results  

SciTech Connect (OSTI)

This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

Muller, M.

2009-09-01T23:59:59.000Z

158

Development and Implementation of Radiation-Hydrodynamics Verification Test Problems  

SciTech Connect (OSTI)

Analytic solutions to the radiation-hydrodynamic equations are useful for verifying any large-scale numerical simulation software that solves the same set of equations. The one-dimensional, spherically symmetric Coggeshall No.9 and No.11 analytic solutions, cell-averaged over a uniform-grid have been developed to analyze the corresponding solutions from the Los Alamos National Laboratory Eulerian Applications Project radiation-hydrodynamics code xRAGE. These Coggeshall solutions have been shown to be independent of heat conduction, providing a unique opportunity for comparison with xRAGE solutions with and without the heat conduction module. Solution convergence was analyzed based on radial step size. Since no shocks are involved in either problem and the solutions are smooth, second-order convergence was expected for both cases. The global L1 errors were used to estimate the convergence rates with and without the heat conduction module implemented.

Marcath, Matthew J. [Los Alamos National Laboratory; Wang, Matthew Y. [Los Alamos National Laboratory; Ramsey, Scott D. [Los Alamos National Laboratory

2012-08-22T23:59:59.000Z

159

Round-robin testing of Soleq EV cort according to the SAE J1634 test procedure dated May 1993  

SciTech Connect (OSTI)

The Society of Automotive Engineers Recommended Practice, SAE J1634, {open_quotes}Electric Vehicle Energy Consumption and Range Test Procedure{close_quotes}, May 1993, describes a standard method of determining the range and energy consumption for electric vehicles. Consequent to the U.S. Department of Energy`s (DOE) rulemaking released on February 4, 1994, the EPA is currently considering factoring electric vehicles into the Corporate Average Fuel Economy (CAFE) calculations using the SAE J1634 procedure. The purpose of this project is to provide information regarding the suitability of this recommended practice for determining the energy economy value to be factored into the CAFE. Issues leading to possible inconsistent results (such as the repeatability of the procedure, thoroughness of the procedure`s methods, and variance between different laboratories using different dynamometers) need to be resolved prior to passing legislation which will mandate use of this test in determining the electric vehicle CAFE credit. To this end, separate tests were performed on a Soleq EVcort vehicle by the INEL, the EPA, Ford Motor Company, Southwest Research Institute, and the California Air Resources Board using their own facilities and personnel. Acceptable departures from the driving profile prescribed by SAEJ1634 are not well defined. This deficiency in the procedure is even more noticeable due to the EVcort`s marginal acceleration performance.

Cole, G.H.

1993-05-01T23:59:59.000Z

160

Butyl rubber O-ring seals: Revision of test procedures for stockpile materials  

SciTech Connect (OSTI)

Extensive testing showed little correlation between test slab and O-ring performance. New procedures, comparable to those used with the traditional test slabs, were defined for hardness, compression set, and tensile property testing on sacrificial O-ring specimens. Changes in target performance values were made as needed and were, in one case, tightened to reflect the O-ring performance data. An additional study was carried out on O-ring and slab performance vs cure cycle and showed little sensitivity of material performance to large changes in curing time. Aging and spectra of certain materials indicated that two sets of test slabs from current vendor were accidently made from EPDM rather than butyl rubber. Random testing found no O-rings made from EPDM. As a result, and additional spectroscope test will be added to the product acceptance procedures to verify the type of rubber compound used.

Domeier, L.A.; Wagter, K.R.

1996-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

May 7, 2012 DRAFT CHITTERLING TEST PROCEDURE FOR NIST HANDBOOK 133 Page 1 of 24  

E-Print Network [OSTI]

the approaches to testing appeared to be consistent. However, because NIST Handbook 133 does not include a purgeMay 7, 2012 DRAFT CHITTERLING TEST PROCEDURE FOR NIST HANDBOOK 133 Page 1 of 24 DETERMINING THE AMOUNT OF PURGE FROM CHITTERLINGS USING NIST HANDBOOK 133 "CHECKING THE NET CONTENTS OF PACKAGED GOODS

162

Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for  

Broader source: Energy.gov (indexed) [DOE]

6/2/11 6/2/11 Comments to the following DOE Proposed Rules: 10 CFR Part 431 [Docket No. EERE-2010-BT-TP-0036] RIN 1904-AC38 Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Automatic Commercial Ice Makers Submitted by: Mary C. Howe, President, Howe Corporation, Chicago, IL 60642 mchowe@howecorp.com CORPORATION 1650 N Elston Ave * Chicago, IL. 60642 * (773) 235-0200 * Fax (773) 235-0269 * E-mail: howeinfo@howecorp.com 2 Item 1 - DOE also requests comment on the proposal that the use of amended test procedure be required upon the effective date of any test procedure final rule, 30 days after publication in the Federal Register. In the case of the addition of continuous production remote condenser ACIM's, the outside testing

163

Information Resources: IESNA LM-80-08 - An Overview of the Test Procedure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® This October 30, 2008 webcast provided an overview of LM-80-08, Approved Method for Measuring Lumen Maintenance of LED Light Sources, and how DOE's ENERGY STAR program for Solid-State Lighting (SSL) Luminaires will use LM-80 to estimate lifetime for qualified SSL Luminaires. Richard Karney, U.S. Department of Energy, began the webcast with the announcement that LM-80-08 is now available through IESNA. The test procedure can be purchased online through the IES store at https://www.ies.org/store/. Kevin Dowling, Chairman, Testing Procedures SSL Committee, presented on the specifics of the LM-80 test procedure and the changes reflected in the final version. Jeff McCullough, Pacific Northwest National Laboratory, went through an overview of how the results of LM-80 are used for the DOE ENERGY STAR SSL program.

164

System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)  

SciTech Connect (OSTI)

This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.

GARRISON, R.C.

2000-11-28T23:59:59.000Z

165

Design and testing of a procedure for evaluating fuel-efficient crankcase lubricants  

SciTech Connect (OSTI)

Experiments were conducted to design and evaluate a procedure for evaluating the fuel efficiency characteristics of crankcase lubricants using the driving cycles of the 1975 Federal Test Procedure and the Highway Fuel Economy Test. Most of the test protocol was based on guidelines proposed by the American Society for Testing and Materials. Three crankcase lubricants and five oil supplements, as well as a baseline lubricant, were used in eight 1980 model-year vehicles of identical make. The vehicles were operated at 75/sup 0/F (24/sup 0/C) in closely controlled chassis dynamometer tests designed to detect small changes in fuel efficiency. Results from these tests showed measurable increases in fuel economy of 0 to 6% with the test lubricants when compared to a common SAE 30 grade oil. These results are not definitive because of lack of quantification of mileage accumulation effects. The test protocol did reduce measurement variability greatly; this procedure can be applied to evaluation of fuel-efficient oils using larger test fleets. A good potential exists for improving the fuel economy of the US automotive fleet. Because of the large quantities of petroleum consumed in the automotive sector, this potential savings translates into conserving a very significant quantity of petroleum.

Naman, T.M.

1981-04-01T23:59:59.000Z

166

Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Interim Test Procedures for Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications S. Chakraborty, W. Kramer, B. Kroposki, G. Martin, P. McNutt, M. Kuss, T. Markel, and A. Hoke Technical Report NREL/TP-5500-51001 June 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications S. Chakraborty, W. Kramer, B. Kroposki, G. Martin, P. McNutt, M. Kuss, T. Markel,

167

Use of Exact Solutions of Wave Propagation Problems to Guide Implementation of Nonlinear Seismic Ground Response Analysis Procedures  

E-Print Network [OSTI]

?1992?. SUMDES: A nonlinear procedure for response analysisusing ?nite element procedures and incorporating a compliantGround Response Analysis Procedures Annie O. L. Kwok, M.ASCE

2007-01-01T23:59:59.000Z

168

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS)  

E-Print Network [OSTI]

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS) Sunjaya the photodiode and readout transistors into two parallel operating devices, while keeping a common row select-tolerant photodiode APS was designed and fabricated using a CMOS 0.18µm process. Testing included both fully

Chapman, Glenn H.

169

DOE response to questions from AHAM on the supplemental proposed test procedure  

Broader source: Energy.gov (indexed) [DOE]

response to questions from AHAM on the supplemental proposed test procedure for response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers"? (1) What exactly does the language in Part B mean and what is the intent? * The intent of Part B is to use the methodology that AHAM had suggested specifically for extra-hot cycles, but to make it more broadly applicable to any temperature combination that is locked out of the Normal cycle. * The proposed Part (B) language is meant to be consistent with GE's original suggestion in response to the NOPR. (GE, No. 15 at pp. 1-2) * When testing cycles under Part (B), manufacturers would only need to test the temperature combination that is locked out of the Normal cycle.

170

CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure  

SciTech Connect (OSTI)

This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE).

Akerson, A.W.

1995-01-01T23:59:59.000Z

171

Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction  

Broader source: Energy.gov [DOE]

On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

172

DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test Procedures  

Broader source: Energy.gov [DOE]

The Department of Energy has published a notice of proposed rulemaking regarding test procedures for residential water heaters and certain commercial water heaters.

173

Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1  

SciTech Connect (OSTI)

This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

Satoh, J.A.

1995-05-25T23:59:59.000Z

174

Development and testing of a standard procedure for determining the viscous properties of crosslinked fracture fluids  

E-Print Network [OSTI]

of the shear rate at the bob by use of the Kr ieger correction. During the develop- ment of the testing pr ocedur e, it was discover ed that the gel experienced shear degradation when subjected to an incr easing shear rate. Therefore, the shear rate should... always be decreased when measuring these fluids. The applicability of the testing procedure was verified by test- ing gel systems supplied by four service companies with gel concentrations of 0. 48$ and 0. 72$ HPG (40 and 60 Ib/1000 gal, respectively...

Worlow, David Wayne

1987-01-01T23:59:59.000Z

175

Operability test procedure for rotary mode core sampling system {number_sign}3  

SciTech Connect (OSTI)

This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

Farris, T.R.; Jarecki, T.D.

1995-04-26T23:59:59.000Z

176

Operability test procedure for rotary mode core sampling system {number_sign}4  

SciTech Connect (OSTI)

This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

Farris, T.R.; Jarecki, T.D.

1995-04-26T23:59:59.000Z

177

MEMORANDUM TO: File FROM: David R. Hill RE: Meeting Concerning Potential Test Procedures and Energy Conservation  

Broader source: Energy.gov (indexed) [DOE]

MEMORANDUM MEMORANDUM TO: File FROM: David R. Hill RE: Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment DATE: March 14, 2012 In compliance with the Department of Energy's guidance on ex parte communications (74 Fed. Reg. 52795 (Oct. 14, 2009)), this memorandum provides a summary of a March 7, 2012, meeting with DOE officials concerning potential test procedures and energy conservation standards for set-top boxes and network equipment. Meeting attendees: John Cymbalski (DOE - EE) Jeremy Dommu (DOE - EE) Ashley Armstrong (DOE - EE) Dan Cohen (DOE - GC) Celia Sher (DOE - GC) Cecilia Martaus (AT&T) Mike Pfau (AT&T) Jeff Dygert (AT&T) David Hill (Sidley Austin) The AT&T representatives discussed a number of concerns with DOE's potential promulgation

178

Sampling and Analysis Procedures for Gas, Condensate, Brine, and Solids: Pleasant Bayou Well Test, 1988-Present  

SciTech Connect (OSTI)

This section covers analyses performed on gas. Chemical analyses can only be related to well performance if the quantity of the various fluids are known. The IGT on-line data computer system measures the flowrate, the pressures, and the temperatures every 10 seconds. These values are automatically recorded over operator selected intervals both on magnetic media and on paper. This allows review of samples versus operating conditions. This paper covers analyses performed on gas, including: An approximate sampling schedule during flow tests; On-site sample handling and storage of gas samples; Addresses of laboratories that perform off site analyses; Sample shipping instructions; Data archiving; and Quality Control/Quality Assurance. It is expected that the above procedures will change as the flow test progresses, but deviations from the written procedures should be approved by C. Hayden of IGT and noted on the results of the analysis.

Hayden, Chris

1988-01-01T23:59:59.000Z

179

Building Technologies Office: Implementation, Certification and Enforcement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Implementation, Implementation, Certification and Enforcement to someone by E-mail Share Building Technologies Office: Implementation, Certification and Enforcement on Facebook Tweet about Building Technologies Office: Implementation, Certification and Enforcement on Twitter Bookmark Building Technologies Office: Implementation, Certification and Enforcement on Google Bookmark Building Technologies Office: Implementation, Certification and Enforcement on Delicious Rank Building Technologies Office: Implementation, Certification and Enforcement on Digg Find More places to share Building Technologies Office: Implementation, Certification and Enforcement on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement Standardized Templates for Reporting Test Results

180

2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of data availability regarding test procedures for battery chargers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 8, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

182

2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

183

2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

184

2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register Final Rule regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 24, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

185

Flight Testing a Real Time Implementation of a UAV Path Planner Using Direct Collocation  

E-Print Network [OSTI]

Flight Testing a Real Time Implementation of a UAV Path Planner Using Direct Collocation Brian R by tracking a second UAV flying a predefined pattern. Finally, a method of commanding the observation vector ^s UAV sensor line of sight unit vector p Attraction point u UAV Control vector xt Target state

186

Telecom Implementation In The first long range link testing (34 KM) was done in 2002  

E-Print Network [OSTI]

Telecom Implementation In Nepal #12;#12;#12;#12;· The first long range link testing (34 KM and gave their inputs #12;Assembling Grid Antenna at Mohare Relay #12;Mr. Kawasumi and Mr. Fuke Buttrich, the trainer from Denmark #12;Jomsom and Kali Valley as seen from Dhakarjung Relay station #12

Lien, Jyh-Ming

187

Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014  

SciTech Connect (OSTI)

The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

Alan Giesbrecht

2014-05-01T23:59:59.000Z

188

Implementation of test for quality assurance in nuclear medicine gamma camera  

SciTech Connect (OSTI)

In nuclear medicine (NM) over 90% of procedures are performed for diagnostic purposes. To ensure adequate diagnostic quality of images and the optimization of the doses received by patients originated from the radioactive material is essential for regular monitoring and equipment performance through a quality assurance program (QAP). The QAP consists of 15 proposed performance tomographic and not tomographic gamma camera (GC) tests, and is based on recommendations of international organizations. We describe some results of the performance parameters of QAP applied to a GC model e.cam Siemens, of the Department of NM of the National Cancer Institute of Mexico (INCan). The results were: (1) The average intrinsic spatial resolution (R{sub in}) was 4.67 {+-} 0.25 mm at the limit of acceptance criterion of 4.4 mm. (2) The sensitivity extrinsic (S{sub ext}), with maximum variations of 1.8% (less than 2% which is the criterion of acceptance). (3) Rotational Uniformity (U{sub rot}), with values of integral uniformity (IU) in the useful field of view detector (UFOV), with maximum percentage change of 0.97% and monthly variations equal angles, ranging from 0.13 to 0.99% less than 1%. (4) The displacement of the center of rotation (DCOR), indicated a maximum deviation of 0.155 {+-} 0.039 mm less than 4.795 mm, an absolute deviation of less than 0.5 where pixel 0.085 pixel is suggested, the criteria are assigned to low-energy collimator high resolution. (5) In tomographic uniformity (U{sub tomo}), UI values (%) and percentage noise level (rms%) were 7.54 {+-} 1.53 and 4.18 {+-} 1.69 which are consistent with the limits of acceptance of 7.0-12.0% and 3.0-6.0% respectively. The smallest cold sphere has a diameter of 11.4 mm. The implementation of a QAP allows for high quality diagnostic images, optimization of the doses given to patients, a reduction of exposure to occupationally exposed workers (POE, by its Spanish acronym), and generally improves the productivity of the service. This proposal can be used to develop a similar QAP in other facilities and may serve as a precedent for the proposed regulations for quality assurance (QA) teams in MN.

Montoya Moreno, A.; Rodriguez Laguna, A.; Trujillo Zamudio, Flavio E [Department of Nuclear Medicine, National Cancer Institute San Fernando Avenue No.22, Col. Section XVI (Mexico)

2012-10-23T23:59:59.000Z

189

Design, implementation and testing of extended and mixed precisionBLAS  

SciTech Connect (OSTI)

This article describes the design rationale, a C implementation, and conformance testing of a subset of the new Standard for the BLAS (Basic Linear Algebra Subroutines): Extended and Mixed Precision BLAS. Permitting higher internal precision and mixed input/output types and precisions allows us to implement some algorithms that are simpler, more accurate, and sometimes faster than possible without these features. The new BLAS are challenging to implement and test because there are many more subroutines than in the existing Standard, and because we must be able to assess whether a higher precision is used for internal computations than is used for either input or output variables. We have therefore developed an automated process of generating and systematically testing these routines. Our methodology is applicable to languages besides C. In particular, our algorithms used in the testing code will be valuable to all other BLAS implementors. Our extra precision routines achieve excellent performance--close to half of the machine peak Megaflop rate even for the Level 2 BLAS, when the data access is stride one.

Li, X.S.; Demmel, J.W.; Bailey, D.H.; Henry, G.; Hida, Y.; Iskandar, J.; Kahan, W.; Kapur, A.; Martin, M.C.; Tung, T.; Yoo, D.J.

2000-10-20T23:59:59.000Z

190

Implementation Implementation  

E-Print Network [OSTI]

The SLP System: An Implementation of Super Logic Programs 1 The SLP System: An Implementation.09.2002 The SLP System: An Implementation of Super Logic Programs 4 SLP Interpreter (1) Negation Semantics Brass Dagstuhl, 16.09.2002 #12; The SLP System: An Implementation of Super Logic Programs 5 SLP

Brass, Stefan

191

Implementation Implementation  

E-Print Network [OSTI]

The SLP System: An Implementation of Super Logic Programs 1 The SLP System: An Implementation: An Implementation of Super Logic Programs 2 Super Logic Programs (1) #15; Arbitrarily nested propositional: An Implementation of Super Logic Programs 3 Super Logic Programs (2) #15; Default negation can be used only

Brass, Stefan

192

An overview of the comprehensive proton therapy machine quality assurance procedures implemented at The University of Texas M. D. Anderson Cancer Center Proton Therapy Center-Houston  

SciTech Connect (OSTI)

The number of proton and carbon ion therapy centers is increasing; however, since the publication of the International Commission on Radiation Units and Measurements report, there has been no dedicated report dealing with proton therapy quality assurance. The purpose of this article is to describe the quality assurance procedures performed on the passively scattered proton therapy beams at The University of Texas M. D. Anderson Cancer Center Proton Therapy Center in Houston. The majorities of these procedures are either adopted from procedures outlined in the American Association of Physicists in Medical Task Group (TG) 40 report or are a modified version of the TG 40 procedures. In addition, new procedures, which were designed specifically to be applicable to the synchrotron at the author's center, have been implemented. The authors' procedures were developed and customized to ensure patient safety and accurate operation of synchrotron to within explicit limits. This article describes these procedures and can be used by others as a guideline for developing QA procedures based on particle accelerator specific parameters and local regulations pertinent to any new facility.

Arjomandy, Bijan; Sahoo, Narayan; Zhu, X. Ronald; Zullo, John R.; Wu, Richard Y.; Zhu Mingping; Ding Xiaoning; Martin, Craig; Ciangaru, George; Gillin, Michael T. [Department of Radiation Physics, University of Texas M. D. Anderson Cancer Center, 1840 Old Spanish Trail, Houston, Texas 77025 (United States)

2009-06-15T23:59:59.000Z

193

2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 12, 2015. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

194

2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

195

2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for miscellaneous refrigeration products, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 26, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

196

2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for furnaces and boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 13, 2015. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

197

2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

198

2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

199

2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

200

SU?E?T?377: Evaluation and Implementation of An IMRT Quality Assurance Procedure to Include Patient?Specific Volumetric Dose Analysis  

Science Journals Connector (OSTI)

Purpose: he purpose of this study is to evaluate and implement a digital IMRT quality assurance (QA) procedure for patient?specific volumetric dose using commercially available products. Dose distributions generated from a treatment planning system (TPS) were delivered and analyzed with dose?volume?histogram (DVH) analysis software. Methods: The MapCheck2 device along with 3DVH (Sun Nuclear Melbourne FL) software was studied for IMRT QA capabilities. All manufacturer specifications were followed in order to properly set up the diode array device for accurate absolute dose measurements. Planar dose maps were generated by the Pinnacle3 TPS (Philips Medical Systems Andover MA) for field?by?field IMRT QA analysis. Also exported from patient plans were RT dose RT plan RT structure and CT data DICOM files. Dose delivery was done using a step?and?shoot en?face technique onto the MapCheck2 device. After measured?vs?calculated planar dose analysis for each beam a planned?dose?perturbation (PDP) file was generated. This PDP file allows the software to manipulate the TPS?calculated dose distributions to include actual measured dose differences from a phantom onto a patient CT?dataset. These dose perturbations are then able to be observed through differences of a TPS?calculated DVH and a measured?DVH within the 3DVH software. Simple tests were performed to assess MapCheck2 performance and 3DVH sensitivity to errors. Results: All planar dose measurements in this study have met the clinical tolerance of 3% absolute dose/3mm gamma analysis. For volumetric analysis the 3D results comparing planned?vs?delivered matching doses (gamma criterion of 3%/3mm) were 99.3% and 98.2% for a rectum and prostate plan respectively. Measurements with introduction of intentional errors produced reasonable results when analyzing dose to critical structures with DVHs. Conclusion: The implementation of a digital QA procedure will facilitate a more efficient workflow for physicists with the added benefit of a patient?specific volumetric dose analysis for physicians.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

2014-09-19 Issuance: Energy Conservation Program for Consumer Products: Test Procedure for Ceiling Fans;NOPR  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking regarding Energy Conservation Program for Consumer Products: Test Procedure for Ceiling Fans, as issued by the Deputy Assistant Secretary for Energy Efficiency on September 19, 2014.

202

Disinfection Procedure for Water Distribution Pipelines Drinking water contamination can be prevented by hydrostatic testing and disinfection of  

E-Print Network [OSTI]

Disinfection Procedure for Water Distribution Pipelines Drinking water contamination can pipeline connections to the system, and respond to requests for drinking water assessments. And, any be prevented by hydrostatic testing and disinfection of potable water distribution pipelines before connecting

de Lijser, Peter

203

Developing standard performance testing procedures for material control and accounting components at a site  

SciTech Connect (OSTI)

The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

Scherer, Carolynn P [Los Alamos National Laboratory; Bushlya, Anatoly V [ROSATOM, RUSSIA; Efimenko, Vladimir F [IPPE, RUSSIA; Ilyanstev, Anatoly [IPPE, RUSSIA; Regoushevsky, Victor I [IPPE, RUSSIA

2010-01-01T23:59:59.000Z

204

ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule  

Broader source: Energy.gov [DOE]

Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

205

Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint  

SciTech Connect (OSTI)

Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

2012-03-01T23:59:59.000Z

206

The evaluation of micro-surfacing mixture design procedures and the effects of material variation on the test responses  

E-Print Network [OSTI]

. Precision Index Statements for Repeatability THE EFFECTS OF WATER, ADDITIVE AND MINERAL FILLER ON THE TEST RESPONSES OF THE MIXTURE DESIGN TESTS Page 45 63 63 66 General 66 Test Procedures 67 Analysis of Results Wet Cohesion Test (30 Minutes) Wet... 23. 30 minutes wet cohesion torque values against additive amounts with 8 percent water 84 FIGURE 24. 30 minutes wet cohesion torque values against mineral filler with 8 percent water 84 FIGURE 25. 30 minutes wet cohesion torque values against...

Andrews, Edward Mensah

2012-06-07T23:59:59.000Z

207

Testing, expanding and implementing pollution prevention tools for environmental restoration and decontamination and decommissioning  

SciTech Connect (OSTI)

Pollution Prevention (P2) programs and projects within the DOE Environmental Restoration (ER) and Decontamination and Decommissioning (D and D) Programs have been independently developed and implemented at various sites. As a result, unique, innovative solutions used at one site may not be known to other sites, and other sites may continue to duplicate efforts to develop and implement similar solutions. Several DOE Program offices have funded the development of tools to assist ER/D and D P2 projects. To realize the full value of these tools, they need to be evaluated and publicized to field sites. To address these needs and concerns, Sandia National Laboratory (SNL/NM), Los Alamos National Laboratory (LANL), and the Oak Ridge Field Office (DOE-OR) have teamed to pilot test DOE training and tracking tools; transfer common P2 analyses between sites, and evaluate and expand P2 tools and methodologies. The project is supported by FY 98 DOE Pollution Prevention Complex-Wide Project Funds. This paper presents the preliminary results for each of the following project modules: Training, Waste Tracking Pilot, Information Exchange, Evaluate P2 Tools for ER/D and D, Field Test of P2 Tools; and DOE Information Exchange.

Roybal, J.A. [Sandia National Lab., Albuquerque, NM (United States); McInroy, D. [Los Alamos National Lab., NM (United States); Watson, J. [GTS Duratek, Albuquerque, NM (United States); Mizner, J. [ICF Kaiser, Albuquerque, NM (United States)

1998-06-01T23:59:59.000Z

208

Proceedings of the Technology Roadmap Workshop on Communication and Control Systems for Distributed Energy Implementation and Testing, May 2002  

Broader source: Energy.gov [DOE]

This report presents the proceedings of a technical workshop on communication and control systems for the implementation and testing of distributed energy devises such as microturbines, fuel cells, and photovoltaic arrays.

209

The design, implementation and testing of data gathering instrumentation for measurement of electromagnetic interference in electric power substations  

E-Print Network [OSTI]

THE DESIGN, IMPLEMENTATION AND TESTING OF DATA GATHERING INSTRUMENTATION FOR MEASUREMENT OF ELECTROMAGNETIC INTERFERENCE IN ELECTRIC POWER SUBSTATIONS A Thesis by GARY WAYNE GERLOFF Submitted to the Graduate College of Texas AAM University... IN ELECTRIC POWER SUBSTATIONS A Thesis by GARY WAYNE GERLOFF Approved as to style and content by: B. Don Russell (Chairman of Committee) A. K. A IM Sallie She p rd (Member) August 1983 ABSTRACT The Design, Implementation and Testing of Data...

Gerloff, Gary Wayne

2012-06-07T23:59:59.000Z

210

Retrofitting Vegas: Implementing Energy Efficiency in Two Las Vegas Test Homes  

SciTech Connect (OSTI)

In 2009, the state of Nevada received nearly forty million dollars in Neighborhood Stabilization Funds from the Department of Housing and Urban Development. The purpose of this funding was to stabilize communities that have suffered from foreclosures and abandonment. In an effort to provide guidance to local officials and maximize how effectively this NSP funding is utilized in retrofitting homes, CARB provided design specifications, energy modeling, and technical support for the Building America Retrofit Alliance (BARA) team and its local partners - Better Building Performance, Nevada Energy Star Partners Green Alliance, and Home Free Nevada - for two retrofit test homes. One home was to demonstrate a modest retrofit and the other a deep energy retrofit. Through this project, CARB has provided two robust solution packages for retrofitting homes built in this region between the 1980s and early 1990s without substantially inconveniencing the occupants. The two test homes, the Carmen and Sierra Hills, demonstrate how cost-effectively energy efficient upgrades can be implemented in the hot, dry climate of the Southwest. In addition, the homes were used as an educational experience for home performance professionals, building trades, remodelers, and the general public. In-field trainings on air-sealing, HVAC upgrades, and insulating were provided to local contractors during the retrofit and BARA documented these retrofits through a series of video presentations, beginning with a site survey and concluding with the finished remodel and test out.

Puttagunta, S.

2013-04-01T23:59:59.000Z

211

Title of Position: Electrical Engineering Technologist There is a position available for technologist in the hardware implementation and testing of  

E-Print Network [OSTI]

. Languages: Speak English, Read English, Write English. Duties: Design, develop and test of electronicTitle of Position: Electrical Engineering Technologist There is a position available for technologist in the hardware implementation and testing of wireless systems, start date: March 2015. Primarily

Waterloo, University of

212

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice of proposed rulemaking for a test procedure for set-top boxes and the proposed coverage determination for set-top boxes and network equipment.

213

aimer: This guideline is designed primarily as an educational resource for clinicians to help them provide quality medical care It should not be considered inclusive of all proper procedures and tests or exclusive of other procedures and tests that are re  

E-Print Network [OSTI]

provide quality medical care It should not be considered inclusive of all proper procedures and tests or exclusive of other procedures and tests that are reasonably directed to obtaining the same results the propriety of any specific procedure or test, the clinician should apply his or her own professional judgment

Levin, Judith G.

214

The design and testing of a procedure to locate fresh submarine groundwater discharge in Cyprus  

E-Print Network [OSTI]

The aim of this collaborative project between Massachusetts Institute of Technology (MIT) and Cyprus Institute was to develop an experimental procedure for identifying fresh submarine groundwater discharge (SGD) in Cyprus. ...

Olesnavage, Kathryn M

2012-01-01T23:59:59.000Z

215

Conceptualizing and testing random indirect effects and moderated mediation in multilevel models: New procedures and recommendations  

E-Print Network [OSTI]

The authors propose new procedures for evaluating direct, indirect, and total effects in multilevel models when all relevant variables are measured at Level 1 and all effects are random. Formulas are provided for the mean ...

Bauer, D. J.; Preacher, K. J.; Gil, Karen M.

2006-01-01T23:59:59.000Z

216

Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications  

SciTech Connect (OSTI)

The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

2011-06-01T23:59:59.000Z

217

DOE Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. EERE2014BTTP0043 / RIN 1904AD36  

Broader source: Energy.gov [DOE]

On 12/19/2014, Apple Inc. met with DOE to discuss the Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure.

218

Implementation of 10 CFR 20.1406, Regarding Minimizing Contamination and the Generation of Waste, and Facilitating Decommissioning through the Design of Facilities and Operating Procedures  

SciTech Connect (OSTI)

In the very near future (perhaps as soon as the fall of 2007), the U.S. Nuclear Regulatory Commission (NRC) anticipates receiving one or more license applications for new nuclear power plants. An important consideration for new facilities is that they be designed and operated to minimize contamination, to minimize the generation of waste, and to facilitate decommissioning. A relatively recent regulation, 10 CFR 20.1406, mandates these requirements. The regulation states, 'Applicants for licenses, other than renewals, after August 20, 1997, shall describe in the application how facility design and procedures for operation will minimize, to the extent practicable, contamination of the facility and the environment, facilitate eventual decommissioning, and minimize, to the extent practicable, the generation of radioactive waste'. This paper summarizes various initiatives taken by the NRC and industry to develop guidance for implementing 10 CFR 20.1406 before submission of license applications. (authors)

O'Donnell, E.; Ott, W.R. [Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC (United States)

2007-07-01T23:59:59.000Z

219

DOE/NBS (Department of Energy/National Bureau of Standards) forum on testing and rating procedures for consumer products, October 2-3, 1985. Final report  

SciTech Connect (OSTI)

One hundred thirty-four persons participated in a Forum on Testing and Rating Procedures for Consumer Products held at the National Bureau of Standards (NBS), Gaithersburg, Maryland, on October 2-3, 1985. The objectives of the forum, planned in cooperation with various industry associations, were: (1) to provide a line of communication between test procedure users and test-procedure developers; (2) to provide an opportunity for participants to present technical and research issues concerning Department of Energy (DOE) test procedures that need to be addressed; and (3) to assist DOE and NBS in establishing a future agenda for the development and/or revision of testing and rating procedures. The report summarizes discussions, conclusions and recommendations developed by the forum participants for the following consumer products: heat pumps and air conditioners; furnaces, boilers, and household heaters; water heaters; refrigerators, refrigerator-freezers and freezers.

Dikkers, R.D.

1986-07-01T23:59:59.000Z

220

Implementation of a Biaxial Resonant Fatigue Test Method on a Large Wind Turbine Blade  

SciTech Connect (OSTI)

A biaxial resonant test method was utilized to simultaneously fatigue test a wind turbine blade in the flap and edge (lead-lag) direction. Biaxial resonant blade fatigue testing is an accelerated life test method utilizing oscillating masses on the blade; each mass is independently oscillated at the respective flap and edge blade resonant frequency. The flap and edge resonant frequency were not controlled, nor were they constant for this demonstrated test method. This biaxial resonant test method presented surmountable challenges in test setup simulation, control and data processing. Biaxial resonant testing has the potential to complete test projects faster than single-axis testing. The load modulation during a biaxial resonant test may necessitate periodic load application above targets or higher applied test cycles.

Snowberg, D.; Dana, S.; Hughes, S.; Berling, P.

2014-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Correlation of cyclic testing procedures for determining liquefaction potential of sands  

E-Print Network [OSTI]

APPARATUS 6. TRIAXIAL CELL USED IN INITIAL TEST SERIES 7. BASEPLATE USED IN INITIAL TEST SERIES 8. INITIAL TEST APPARATUS 9. SCHEMATIC OF TOP CAP AND PISTON MODIFICATIONS 10. SCHEMATIC OF FINAL TEST APPARATUS 11. COMPARISON OF TRIAXIAL BASEPLATES 12...ons may occur during a storm. During earthquakes the permeability of the The style and format of this thesis follow that used by the Journal of the Geotechnical En i neerin D1v1sion, American Society of Civil Engineers. sediment is not usually a...

Janicek, John Patrick

2012-06-07T23:59:59.000Z

222

Influence of nondestructive test procedures on detection of stress-corrosion cracks  

SciTech Connect (OSTI)

A weld T joint from a scrapped carbon-steel digester level tank was used to test the efficacy of the nondestructive liquid-penetrant and magnetic-particle test methods commonly used for field detection of stress-corrosion cracks. The tests were conducted using three methods of surface preparation--wire brushing, light grinding, and sandblasting. Light grinding of the surface greatly increased the sensitivity of both the liquid-penetrant and magnetic-particle test methods. The most successful combination was light surface grinding followed by inspection with a fluorescent liquid.

Reid, J.C. (Industrial Nondestructive Testing Ltd., Burnaby, British Columbia (Canada)); Reid, D.C. (MacMillan Bloedel Ltd., Burnaby, British Columbia (Canada))

1993-08-01T23:59:59.000Z

223

Equipment and procedures for fluid flow and wettability tests of geological materials  

SciTech Connect (OSTI)

The Bartlesville Energy Technology Center, US Department of Energy, has developed several unique types of laboratory apparatus: (1) equipment for measurement of petroleum reservoir fluids at simulated subsurface conditions of temperature and pressure, (2) apparatus for saturation of geological cores with liquids, (3) design of a low internal volume pressure relief valve, and (4) apparatus and procedures for the quantitative determination of the relative wetting of oil and water on geologic materials. The fluid flow apparatus operates on the principles of liquid chromatography except for the replacement of the standard chromatographic column by a geologic core sample; it can be operated at an internal pore pressure of 400 atmospheres and 150/sup 0/C. The apparatus can be applied to the measurement of the adsorption characteristics of reservoir fluids such as surfactants, polymers, chemical tracers and biocides; it is also applicable to the determination of relative permeability relationships and miscible and immiscible fluid flow behavior. The apparatus for the saturation of geologic cores is adaptable for simultaneous saturation of several small cores or a single core up to 50 cm in length and 4 cm in diameter. The pressure relief valve has an internal volume less than 0.5 ml and can operate at pressures as high as 500 atmospheres. The apparatus for determination of wettability was constructed by modification of a commercial centrifuge and the procedure is based on the thermodynamic work required for fluid displacement from a porous medium. This paper incorporates the design features and operational procedures of the apparatus in addition to the computer programs for calculation of miscible phase dispersion of reservoir fluids and adsorption characteristics of reservoir chemicals.

Donaldson, E.C.; Kendall, R.F.; Pavelka, E.A.; Crocker, M.E.

1980-05-01T23:59:59.000Z

224

Analytical methods for establishing least cost search patterns for fault isolation in testing procedures  

E-Print Network [OSTI]

YL and sho!n in 1 i gurc 2. A!sly?is of th ~ configuration shows that each n )ramcter ti!at . . uppoz t: Y can be tested inde . pndently or '. t can t&e . est d in coml& nation, ", as follows: (1) Individually by measuring x), x2, x3, nd x, , v... of the twc will be selected, however, a limit can be established on the maximum number of useful test n-1 patterns at 2 -1, and for the example case, 7. 15 DFCIHIOI'1 CR1TFRIA Intuitively, it woui d be expected to test an itesi . or failure that has a...

Howie, Thomas Fisher

2012-06-07T23:59:59.000Z

225

Measuring it Right: Best Practices in the Selection and Implementation of Cost-Effectiveness Tests  

Broader source: Energy.gov [DOE]

Presents the National Home Performance Council's cost-effectiveness tests, stakeholder concerns, public policy issues, and best practices.

226

2014-10-14 Issuance: Test Procedures and Energy Conservation Standards for Residential Solar Water Heaters; Request for Information  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

227

2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

228

2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

229

2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for high-intesity discharge lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

230

Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes  

SciTech Connect (OSTI)

This supporting document provides a detailed process to test the functions of the circuit switcher, protective relays, alarms, SCADA and 125VDC control logic of 115kV and 13.8kV systems at B3S4 substation following the removal of trip and blocking schemes to Transformer No.1 Circuit Switcher B594.

HACHE, J.M.

1999-08-25T23:59:59.000Z

231

Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs  

E-Print Network [OSTI]

Appliance Manufacturers (AHAM), and Japans own JIS C 9606The U.S. test procedure (AHAM HWL-1) does not include a washAppliance Manufacturers (AHAM) HWL-1 Cold Water: 60 5?F (

Fridley, David

2010-01-01T23:59:59.000Z

232

ISSUANCE 2014-12-23: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking  

Broader source: Energy.gov [DOE]

Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

233

Surveillance Guide - OPS 9.16 Procedure Content and Use  

Broader source: Energy.gov (indexed) [DOE]

PROCEDURE CONTENT AND USE PROCEDURE CONTENT AND USE 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's program for development and use of procedures. The Facility Representative reviews selected operating, surveillance or testing, and maintenance procedures and observes use of the procedures in the facility. This surveillance provides the basis for evaluating contractor performance and for establishing compliance with specific DOE requirements. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 3.0 Requirements Implemented This surveillance is conducted to implement requirements of the Functions, Requirements and Authorities Manual, Section 20, Operations, FRAM #s 4253, 4258, and 4261. These requirements are

234

2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of proposed rulemaking and public meeting regarding test procedures for refrigerated bottled or canned beverage vending machines, as issued by the Deputy Assistant Secretary for Energy Efficiency on August 1, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

235

Treatability study operational testing program and implementation plan for the Gunite and Associated Tanks at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Treatability Study (TS) Operational Testing Program and Implementation Plan identifies operational testing to be performed to: (1) Demonstrate the technical feasibility of methods proposed for the removal of radiochemical sludge heels from the underground storage tanks located at Oak Ridge National Laboratory (ORNL), known as the Gunite and Associated Tanks (GAAT) Operable Unit (OU). (The bulk of the radiochemical waste, which was previously stored in the tanks, was removed during the 1980s, and only a sludge heel remains.) (2) Reduce the uncertainty in meeting the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements for the GAAT OU. (3) Minimize the overall costs to accomplish the first two objectives. An initial Feasibility Study (FS) effort identified uncertainties in the evaluation of various alternatives for addressing the remediation of the GAAT OU. To support future decision making, the US. Department of Energy is performing a TS to identify cost-effective remediation approaches for the GAAT OU by providing information to reduce cost and technical uncertainty and better define acceptable remediation strategies. The testing activities will be initially conducted in a nonradioactive environment at the Tanks Technology Cold Test Facility (TTCTF) at ORNL. This will permit the design and initial performance testing and training activities to be completed while minimizing the risk, employee exposure, and costs associated with the testing effort. The component design and functional testing and initial system performance testing will be completed in the TTCTF. After the component and initial system performance testing have been completed, the operations testing will continue in the North Tank Farm (NTF). This testing has an associated higher cost and risk, but is necessary to provide results for actual waste heel removal.

NONE

1996-03-01T23:59:59.000Z

236

Detailed modelling, implementation and simulation of an all-in-one stability test system including power system protective devices  

Science Journals Connector (OSTI)

This paper presents modelling and simulation results for multiple instability scenarios of the all-in-one test system. The test system is an alteration of the Bonneville Power Administration test system constructed to capture transient (angle), frequency and voltage instability phenomena, resulting in system collapse, within one system. The paper describes general overview of the test system and its associated individual devices modelling. These modelling are both customized and adapted from the built-in model developed by PowerFactory simulation software. The paper also provides a description of different instabilities that can be reproduced by this self-contained system. One of the case study is demonstrated in detail with the necessary initialization settings for reproducing instability scenario.

Rujiroj Leelaruji; Luigi Vanfretti

2012-01-01T23:59:59.000Z

237

DOE National Environmental Policy Act Implementing Procedures...  

Office of Environmental Management (EM)

CERCLA-excluded petroleum and natural gas products means petroleum, including crude oil or any fraction thereof, that is not otherwise specifically listed or designated as a...

238

TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM  

SciTech Connect (OSTI)

This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

WYRWAS RB; PAGE JS; COOKE GS

2012-04-19T23:59:59.000Z

239

Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test  

SciTech Connect (OSTI)

The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

Wang, Jy-An John [ORNL; Tan, Ting [ORNL; Jiang, Hao [ORNL; Zhang, Wei [ORNL; Feng, Zhili [ORNL

2012-10-01T23:59:59.000Z

240

Development, Implementation, and Testing of Fault Detection Strategies on the National Wind Technology Center's Controls Advanced Research Turbines  

SciTech Connect (OSTI)

The National Renewable Energy Laboratory's National Wind Technology Center dedicates two 600 kW turbines for advanced control systems research. A fault detection system for both turbines has been developed, analyzed, and improved across years of experiments to protect the turbines as each new controller is tested. Analysis of field data and ongoing fault detection strategy improvements have resulted in a system of sensors, fault definitions, and detection strategies that have thus far been effective at protecting the turbines. In this paper, we document this fault detection system and provide field data illustrating its operation while detecting a range of failures. In some cases, we discuss the refinement process over time as fault detection strategies were improved. The purpose of this article is to share field experience obtained during the development and field testing of the existing fault detection system, and to offer a possible baseline for comparison with more advanced turbine fault detection controllers.

Johnson, K. E.; Fleming, P. A.

2011-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Architecture, implementation, and testing of a multiple-shell gas injection system for high current implosions on the Z accelerator  

SciTech Connect (OSTI)

Tests are ongoing to conduct {approx}20 MA z-pinch implosions on the Z accelerator at Sandia National Laboratory using Ar, Kr, and D{sub 2} gas puffs as the imploding loads. The relatively high cost of operations on a machine of this scale imposes stringent requirements on the functionality, reliability, and safety of gas puff hardware. Here we describe the development of a prototype gas puff system including the multiple-shell nozzles, electromagnetic drivers for each nozzle's valve, a UV pre-ionizer, and an inductive isolator to isolate the {approx}2.4 MV machine voltage pulse present at the gas load from the necessary electrical and fluid connections made to the puff system from outside the Z vacuum chamber. This paper shows how the assembly couples to the overall Z system and presents data taken to validate the functionality of the overall system.

Krishnan, Mahadevan; Elliott, Kristi Wilson; Madden, Robert E. [Alameda Applied Sciences Corporation, San Leandro, California 94577 (United States); Coleman, P. L. [Evergreen Hill Sciences, Philomath, Oregon 97370 (United States); Thompson, John R. [812 Temple Street, San Diego, California 92106 (United States); Bixler, Alex [Space Sciences Laboratory, University of California, Berkeley, Berkeley, California 94720 (United States); Lamppa, D. C.; McKenney, J. L.; Strizic, T.; Johnson, D.; Johns, O.; Vigil, M. P.; Jones, B.; Ampleford, D. J.; Savage, M. E.; Cuneo, M. E.; Jones, M. C. [Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)

2013-06-15T23:59:59.000Z

242

High Burnup Dry Storage Cask Research and Development Project: Final Test Plan  

Broader source: Energy.gov [DOE]

This Test Plan for the High Burnup Dry Storage Research Project (HDRP) outlines the data to be collected, the high burnup fuel to be included, and the storage system design, procedures, and licensing necessary for implementation.

243

The SAFT-UT (synthetic aperture focusing technique for ultrasonic testing) real-time inspection system: Operational principles and implementation  

SciTech Connect (OSTI)

This document provides a technical description of the real-time imaging system developed for rapid flaw detection and characterization utilizing the synthetic aperture focusing technique for ultrasonic testing (SAFT-UT). The complete fieldable system has been designed to perform inservice inspection of light-water reactor components. Software was written on a DEC LSI 11/23 computer system to control data collection. The unprocessed data is transferred to a VAX 11/730 host computer to perform data processing and image display tasks. A parallel architecture peripheral to the host computer, referred to as the Real-Time SAFT Processor, rapidly performs the SAFT processing function. From the host's point of view, this device operates on the SAFT data in such a way that one may consider it to be a specialized or SAFT array processor. A guide to SAFT-UT theory and conventions is included, along with a detailed description of the operation of the software, how to install the software, and a detailed hardware description.

Hall, T.E.; Reid, L.D.; Doctor, S.R.

1988-06-01T23:59:59.000Z

244

A minority research and education information service: Design, develop, pilot test, and implement on-line access for historically black colleges and universities and government agencies  

SciTech Connect (OSTI)

This Annual Status Report describes the design, development and implementation of the Minority On-Line Information Service (MOLIS) project by Federal Information Exchange, Inc. for the period of April 1, 1991 to March 31, 1992. Summary information detailing developments prior to this reporting period will also be included to establish a comprehensive perspective of the project. The goal of the MOLIS project, was to develop, design, pilot test on-line access to current information on minority colleges and universities and federal minority opportunities. Federal Information Exchange, Inc. (FIE), a diversified information services company recognized by researchers and educators as a leader in the field of information delivery services, was awarded a 5 year small business research grant to develop and implement MOLIS. Since April 29, 1991, the inauguration of its on-line service, MOLIS has provided current information on 138 Black and Hispanic colleges and universities -- including faculty and student profiles, financial data, research centers and equipment information, pre-college and education programs, emerging capabilities, enrollment data, administrative personnel data, and current events -- as well as minority opportunities from 8 participating federal agencies.

Rodman, J.A.

1992-01-01T23:59:59.000Z

245

Council on Environmental Quality - Regulations for Implementing...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- StatuteStatute: Council on Environmental Quality - Regulations for Implementing the Procedural Provisions of the NEPALegal Abstract...

246

Test instructions for the horizontal borehole demonstration at the Near-Surface Test Facility  

SciTech Connect (OSTI)

This test outlines the planned activities designed to demonstrate the horizontal borehole drilling and testing operations at the Near Surface Test Facility prior to the performance of these methods within the Exploratory Shaft underground facility. This document will also lead to establishing the operating and safety procedures which will be implemented in the Exploratory Shaft long exploratory borehole drilling and testing program. 7 refs., 3 figs., 1 tab.

McLellan, G.W. (Rockwell International Corp., Richland, WA (USA). Energy Systems Group)

1984-03-01T23:59:59.000Z

247

Foreign Obligations Implementation Status Presentation  

National Nuclear Security Administration (NNSA)

January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, January 13, 2004 Crowne Plaza Ravinia Atlanta, Georgia Georgia Obligations Accounting Implementation Workshop Obligations Accounting Implementation Workshop Foreign Obligations Implementation Status Brian G. Horn U.S. Nuclear Regulatory Commission January 13, 2004 Obligations Accounting Implementation Workshop January 13, 2 Obligations Accounting Implementation Workshop January 13, 2004 Crowne Plaza Ravinia Atlanta, GA 004 Crowne Plaza Ravinia Atlanta, GA Overview of Meeting Overview of Meeting * Review how the Obligation Tracking System is working * Presentations: - Review of Government notification procedures - Establishment of the beginning Obligation Balances for sites

248

Procedural Safeguards  

Science Journals Connector (OSTI)

Procedural Safeguards are protections afforded by the Individuals with...2004...(IDEIA) to each student with a disability and to his or her parents to ensure that the student receives a free and appropriate publi...

Debra Dunn Esq.

2013-01-01T23:59:59.000Z

249

Policy on Policies and Procedures Purpose: To establish a framework for the development, approval and ongoing review  

E-Print Network [OSTI]

Policy Policy on Policies and Procedures Purpose: To establish a framework for the development, approval and ongoing review of Murdoch University's policies and procedures. Audience: Staff Supporting Procedures: Procedure for the Development, Implementation, Monitoring and Review of Policies Procedure

250

Procedures - 88-Inch Cyclotron  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Procedures Procedures (You must be logged in with your Berkeley Lab LDAP to view the procedures) PUB-3000...

251

DOE/EA-1673: Environmental Assessment for Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment (July 2009)  

Broader source: Energy.gov (indexed) [DOE]

3 3 Environmental Assessment for 10 CFR 431 Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air- Conditioning, and Water-Heating Equipment July 2009 8-i CHAPTER 8. ENVIRONMENTAL ASSESSMENT TABLE OF CONTENTS 8.1 INTRODUCTION ............................................................................................................... 8-1 8.2 AIR QUALITY ANALYSIS ............................................................................................... 8-1 8.3 AIR POLLUTANT DESCRIPTIONS ................................................................................ 8-1 8.4 AIR QUALITY REGULATIONS ...................................................................................... 8-3

252

Building Technologies Office: Standardized Templates for Reporting Test  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Standardized Templates Standardized Templates for Reporting Test Results to someone by E-mail Share Building Technologies Office: Standardized Templates for Reporting Test Results on Facebook Tweet about Building Technologies Office: Standardized Templates for Reporting Test Results on Twitter Bookmark Building Technologies Office: Standardized Templates for Reporting Test Results on Google Bookmark Building Technologies Office: Standardized Templates for Reporting Test Results on Delicious Rank Building Technologies Office: Standardized Templates for Reporting Test Results on Digg Find More places to share Building Technologies Office: Standardized Templates for Reporting Test Results on AddThis.com... About Standards & Test Procedures Implementation, Certification & Enforcement

253

QualityAssurance&Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Testing and Testing Manufacturing Technologies The Manufacturing Science & Technology Center provides customers with manufacturing quality requirements, testing standards and specifica- tions for new product designs, including the implementation of these requirements into final product acceptance complete with documenta- tion. Technical support and procedures are fur- nished for Interagency Product Acceptance. Capabilities * Will inspect printed circuit (PC) boards, wire wrap boards, boxes, chassis, cables, racks, systems, etc. * Work from sketches or formal drawings * Review drawings and requirements * Visual inspections for layout, markings, solder joints, components, mechanical assembly, general workmanship, safety * Point-to-point continuity checks

254

DOE Solicits Views on the Implementation of Large-Capacity Clothes Washer  

Broader source: Energy.gov (indexed) [DOE]

Solicits Views on the Implementation of Large-Capacity Clothes Solicits Views on the Implementation of Large-Capacity Clothes Washer Waivers DOE Solicits Views on the Implementation of Large-Capacity Clothes Washer Waivers November 30, 2010 - 10:56am Addthis The Department of Energy has recently granted several requests for waivers establishing an alternative test procedure for certain large-capacity residential clothes washer models. We have now received follow-up questions about the proper application of these waivers. Since these questions affect multiple manufacturers and the public, we have decided the proper course is to invite interested parties to submit views on the proper application of these waivers to existing clothes washer models and units by Tuesday, December 7th. The Department's current test procedure for residential clothes washers

255

Monitored Geologic Repository Test Evaluation Plan  

SciTech Connect (OSTI)

The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

M.B. Skorska

2002-01-02T23:59:59.000Z

256

Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs  

E-Print Network [OSTI]

intended for household or similar use Japan Test Procedurehousehold clothes washers include the United States, Canada, Korea, the European Union, Australia and New Zealand, Japan,

Fridley, David

2010-01-01T23:59:59.000Z

257

Preparing for Project Implementation Financing Project Implementation  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Project Implementation Financing Project Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

258

Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement  

SciTech Connect (OSTI)

This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

VanBaalen, R.A.

1995-02-01T23:59:59.000Z

259

Additional Guidance Regarding Application of Current Procedures...  

Broader source: Energy.gov (indexed) [DOE]

Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

260

Impact of ethanol and butanol as oxygenates on SIDI engine efficiency and emissions using steady-state and transient test procedures  

Broader source: Energy.gov [DOE]

Alcohols as gasoline blending agent at up to 85 vol-% levels were evaluated in a 2.2L direct injection SI engine for combustion, engine efficiency, and engine-out emissions effects at steady-state and transient test conditions

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Procedure for Koehler Digital Constant Temperature Viscosity Bath This unit is designed to perform kinematic viscosity tests using glass capillary viscometers, for this lab  

E-Print Network [OSTI]

protection (OTP), which protects the system and prevents the bath from exceeding safe Actual Bath Temp protection circuit which prevents operating this unit under unsafe electrical conditions. If the power to perform kinematic viscosity tests using glass capillary viscometers, for this lab you will be using Cannon

Saskatchewan, University of

262

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

263

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

264

Delegation Procedures - DOE Directives, Delegations, and Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Delegation Procedures Text Delegation Procedures Delegation Template Text Redelegation Procedures Redelegation Template Delegation Procedures Redelegation Procedures...

265

Special Nuclear Material Portal Monitoring at the Nevada Test Site  

SciTech Connect (OSTI)

Prior to April 2007, acceptance and performance testing of the various Special Nuclear Material (SNM) monitoring devices at the Nevada Test Site (NTS) was performed by the Radiological Health Instrumentation department. Calibration and performance testing on the PM-700 personnel portal monitor was performed, but there was no test program for the VM-250 vehicle portal monitor. The handheld SNM monitors, the TSA model 470B, were being calibrated annually, but there was no performance test program. In April of 2007, the Material Control and Accountability Manager volunteered to take over performance testing of all SNM portal monitors at NTS in order to strengthen the program and meet U.S. Department of Energy Order requirements. This paper will discuss the following activities associated with developing a performance testing program: changing the culture, learning the systems, developing and implementing procedures, troubleshooting and repair, validating the process, physical control of equipment, acquisition of new systems, and implementing the performance test program.

DeAnn Long; Michael Murphy

2008-07-01T23:59:59.000Z

266

MENTAL POLICY ACT IMPLE- MENTING PROCEDURES Subpart A-General  

Broader source: Energy.gov (indexed) [DOE]

9 9 Department of Energy § 1021.102 PART 1021-NATIONAL ENVIRON- MENTAL POLICY ACT IMPLE- MENTING PROCEDURES Subpart A-General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activi- ties. Subpart B-DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on ac- tions during the NEPA process. 1021.212 Research, development, demonstra- tion, and testing. 1021.213 Rulemaking. 1021.214 Adjudicatory proceedings. 1021.215 Applicant process. 1021.216 Procurement, financial assistance, and joint ventures. Subpart C-Implementing Procedures 1021.300 General requirements. 1021.301 Agency review and public participa-

267

INTERIM SEXUAL AND GENDER-BASED HARASSMENT POLICY AND PROCEDURES  

E-Print Network [OSTI]

8/7/14 INTERIM SEXUAL AND GENDER-BASED HARASSMENT POLICY AND PROCEDURES FOR THE FACULTY OF ARTS Relationships Between Staff IV. Interim Procedures for Implementing Interim Sexual and Gender-Based Harassment Policy Including for Discipline A. Introduction B. Requests for Information and Advice C. Procedures

Paulsson, Johan

268

Departmental Personnel Security - Implementation Guidance | Department...  

Office of Environmental Management (EM)

Overview of Security ClearanceAccess Authorization Process for Applicants Drug Testing Implementation Guidance December 3, 2007 Template for Contractor Company Template for...

269

Student Policies & Procedures  

E-Print Network [OSTI]

Student Policies & Procedures summer.uci.edu #12;STUDENT POLICIES AND PROCEDURES Rev. 04/2014 1 ...................................................................................... 9 #12;STUDENT POLICIES AND PROCEDURES Rev. 04/2014 2 Who Summer Session Serves Current UCI Students

Barrett, Jeffrey A.

270

Contract and Procedure  

E-Print Network [OSTI]

This paper examines both the theoretical underpinnings and empirical picture of procedural contracts. Procedural contracts may be understood as contracts in which parties regulate not merely their commercial relations but also the procedures...

Drahozal, Christopher R.

2011-01-01T23:59:59.000Z

271

DOE Receives Responses on the Implementation of Large-Capacity Clothes  

Broader source: Energy.gov (indexed) [DOE]

Receives Responses on the Implementation of Large-Capacity Receives Responses on the Implementation of Large-Capacity Clothes Washer Waivers DOE Receives Responses on the Implementation of Large-Capacity Clothes Washer Waivers December 8, 2010 - 11:02am Addthis The Department last week invited interested parties to submit views on the proper application of waivers establishing alternative test procedures for existing large-capacity residential clothes washer models and units. We received responses from several parties, which can be found below. Alliance Laundry Systems EarthJustice Electrolux GE Appliances and Lighting LG Electronics Whirlpool Corporation The Department is currently reviewing these responses and will promptly make public its conclusions. Addthis Related Articles DOE Solicits Views on the Implementation of Large-Capacity Clothes Washer

272

Treatability Study Operational Testing Program and Implementation Plan for the Gunite and Associated Tanks at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

To support future decision making of the Gunite and Associated Tanks (GAAT) Operable Unit (OU) remedy selection, the Department of Energy (DOE) is performing a Treatability Study (TS), consistent with the EPA guidance for Comprehensive Environmental Response, compensation, and Liability Act (CERCLA) treatability studies. The study will inform stakeholders about various waste removal technologies and the cost of potential remediation approaches, particularly the cost associated with sluicing and the reduction in risk to human health and the environment from tank content removal. As part of the GAAT OU remedy, a series of studies and technology tests will be preformed. These may address one or more of the following areas, characterization, removal, treatment, and transfer of wastes stored in the GAAT OU.

NONE

1996-09-01T23:59:59.000Z

273

TRUPACT-1 implementation plan  

SciTech Connect (OSTI)

TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

1985-09-01T23:59:59.000Z

274

IDEAReauthorized Statute PROCEDURAL SAFEGUARDS  

E-Print Network [OSTI]

IDEA­Reauthorized Statute PROCEDURAL SAFEGUARDS: SURROGATES, NOTICE AND CONSENT (See also Changes addresses only the changes to IDEA provisions regarding procedural safeguards related to notice to parents the provision of procedural safeguards notices to parents. A copy of the procedural safeguards available

275

Standardized Templates for Reporting Test Results | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance & Equipment Standards » Implementation, Certification, & Appliance & Equipment Standards » Implementation, Certification, & Enforcement » Standardized Templates for Reporting Test Results Standardized Templates for Reporting Test Results The Department of Energy (DOE) develops standardized data templates for reporting the results of tests conducted in accordance with current DOE test procedures. Templates may be used by third-party laboratories under contract with DOE that conduct testing in support of ENERGY STAR® verification, DOE rulemakings, and enforcement of the federal energy conservation standards. Standardized DOE Testing Templates Residential Product Templates Automatic Commercial Ice Makers - September 17, 2012 Battery Chargers - June 13, 2011 Beverage Vending Machines - October 25, 2012 Central Air Conditioners and Central Air Conditioning Heat Pumps -

276

Procedure for Performing PEM Single Cell Testing  

Broader source: Energy.gov [DOE]

Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

277

A minority research and education information service: Design, develop, pilot test, and implement on-line access for historically black colleges and universities and government agencies. Annual status report, April 1, 1991--March 31, 1992  

SciTech Connect (OSTI)

This Annual Status Report describes the design, development and implementation of the Minority On-Line Information Service (MOLIS) project by Federal Information Exchange, Inc. for the period of April 1, 1991 to March 31, 1992. Summary information detailing developments prior to this reporting period will also be included to establish a comprehensive perspective of the project. The goal of the MOLIS project, was to develop, design, pilot test on-line access to current information on minority colleges and universities and federal minority opportunities. Federal Information Exchange, Inc. (FIE), a diversified information services company recognized by researchers and educators as a leader in the field of information delivery services, was awarded a 5 year small business research grant to develop and implement MOLIS. Since April 29, 1991, the inauguration of its on-line service, MOLIS has provided current information on 138 Black and Hispanic colleges and universities -- including faculty and student profiles, financial data, research centers and equipment information, pre-college and education programs, emerging capabilities, enrollment data, administrative personnel data, and current events -- as well as minority opportunities from 8 participating federal agencies.

Rodman, J.A.

1992-06-01T23:59:59.000Z

278

A minority research and education information service: Design, develop, pilot test, and implement on-line access for historically black colleges and universities and government agencies. Annual status report, September 28, 1992--September 27, 1993  

SciTech Connect (OSTI)

The goal of the MOLIS project was to develop, design, and pilot test on-line access to current information on minority colleges and universities as well as federal minority opportunities. Federal Information Exchange, Inc. (FIE), a diversified information services company recognized by researchers and educators as a leader in the field of information delivery services, was awarded a 5 year small business research grant to develop and implement MOLIS. Since going on-line on April 29, 1991, MOLIS has provided current information on 138 Black and Hispanic colleges and universities -- including faculty and student profiles, financial data, research centers and equipment information, precollege and education programs, emerging capabilities, enrollment data, administrative personnel data, and current events -- as well as minority opportunities from participating federal agencies. Six federal agencies are currently participating in MOLIS, including: Agency for International Development; Department of Commerce; Department of Energy; Department of Housing and Urban Development; National Aeronautics and Space Administration; and National Science Foundation.

Rodman, J.A.

1993-08-01T23:59:59.000Z

279

Honeywell modular automation system acceptance test report  

SciTech Connect (OSTI)

This document provides the results of the Acceptance Test Procedure for the Honeywell Modular Automation System.

Cunningham, L.T., Westinghouse Hanford

1996-06-14T23:59:59.000Z

280

Reference Manual and Procedures for Implementation of PURPA Standards...  

Broader source: Energy.gov (indexed) [DOE]

the Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary...

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

A prototype on-line work procedure system for radioisotope thermoelectric generator production  

SciTech Connect (OSTI)

An on-line system to manage work procedures is being developed to support radioisotope thermoelectric generator (RTG) assembly and testing in a new production facility. This system implements production work procedures as interactive electronic documents executed at the work site with no intermediate printed form. It provides good control of the creation and application of work procedures and provides active assistance to the worker in performing them and in documenting the results. An extensive prototype of this system is being evaluated to ensure that it will have all the necessary features and that it will fit the user's needs and expectations. This effort has involved the Radioisotope Power Systems Facility (RPSF) operations organization and technology transfer between Westinghouse Hanford Company (Westinghouse Hanford) and EG G Mound Applied Technologies Inc. (Mound) at the US Department of Energy (DOE) Mound Site. 1 ref.

Kiebel, G.R.

1991-09-01T23:59:59.000Z

282

Pressure Safety Program Implementation at ORNL  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) facility that is managed by UT-Battelle, LLC. In February 2006, DOE promulgated worker safety and health regulations to govern contractor activities at DOE sites. These regulations, which are provided in 10 CFR 851, Worker Safety and Health Program, establish requirements for worker safety and health program that reduce or prevent occupational injuries, illnesses, and accidental losses by providing DOE contractors and their workers with safe and healthful workplaces at DOE sites. The regulations state that contractors must achieve compliance no later than May 25, 2007. According to 10 CFR 851, Subpart C, Specific Program Requirements, contractors must have a structured approach to their worker safety and health programs that at a minimum includes provisions for pressure safety. In implementing the structured approach for pressure safety, contractors must establish safety policies and procedures to ensure that pressure systems are designed, fabricated, tested, inspected, maintained, repaired, and operated by trained, qualified personnel in accordance with applicable sound engineering principles. In addition, contractors must ensure that all pressure vessels, boilers, air receivers, and supporting piping systems conform to (1) applicable American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (2004) Sections I through XII, including applicable code cases; (2) applicable ASME B31 piping codes; and (3) the strictest applicable state and local codes. When national consensus codes are not applicable because of pressure range, vessel geometry, use of special materials, etc., contractors must implement measures to provide equivalent protection and ensure a level of safety greater than or equal to the level of protection afforded by the ASME or applicable state or local codes. This report documents the work performed to address legacy pressure vessel deficiencies and comply with pressure safety requirements in 10 CFR 851. It also describes actions taken to develop and implement ORNLs Pressure Safety Program.

Lower, Mark [ORNL; Etheridge, Tom [ORNL; Oland, C. Barry [XCEL Engineering, Inc.

2013-01-01T23:59:59.000Z

283

Implementing for Implementing Executive Order 13423  

Broader source: Energy.gov (indexed) [DOE]

IMPLEMENTING EXECUTIVE IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" March 29, 2007 0 Contents I. Introduction ......................................................................................................................1 A. Purpose..................................................................................................................1 B. Authority ...............................................................................................................1 C. Organization and Oversight ..................................................................................1 D. Overarching Policy and Directives .......................................................................4

284

Computerized procedures system  

SciTech Connect (OSTI)

An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

Lipner, Melvin H. (Monroeville, PA); Mundy, Roger A. (North Huntingdon, PA); Franusich, Michael D. (Upper St. Clair, PA)

2010-10-12T23:59:59.000Z

285

Experimental Procedures 2.1 Introduction  

E-Print Network [OSTI]

procedures utilised to characterise austempered ductile irons obtained in the present thesis. The experiments the experimental programme for austempered samples. before quenching in water with breaking silica tubes, manufactured by Fuji Electronic Industrial Co. Ltd., is a laboratory machine capable of implementing speci ed

Cambridge, University of

286

Greenhouse Policies and Procedures Dept. of Biology  

E-Print Network [OSTI]

lighting and uses swamp coolers to help maintain temperature. The greenhouse potting shed contains benchGreenhouse Policies and Procedures Dept. of Biology Syracuse University Implemented 1 March 2012 Greenhouse manager: Paul Logue Greenhouse Committee: David Althoff, Heather Coleman, Jason Fridley, Paul

Segraves, Kari A.

287

The CLEO Collaboration: Membership Policies, and Procedures  

E-Print Network [OSTI]

The CLEO Collaboration: Membership Policies, and Procedures updated October 2002 by Ian Shipsey Introduction The CLEO Collaboration is currently preparing to implement CLEO-c, a four year experimental.cornell.edu/public/CLEO/spoke/CLEOc/ProjDesc.html New collaborators are encouraged work with us in this endeavor. General information about

288

Verification and Monitoring: Requirements and Procedures  

Science Journals Connector (OSTI)

When a cleanroom is first installed or any significant changes ... and control. Many of the procedures for cleanroom monitoring are described in IES RP-006,...Recommended Practice for Testing Clean Ro...

Alvin Lieberman

1992-01-01T23:59:59.000Z

289

Project 1640 Palomar Procedures  

E-Print Network [OSTI]

Project 1640 Palomar Procedures Version 0.1 7/7/08 2:11:08 PM #12;2 Project 1640 Design and Operations Table of Contents Project 1640..................................................................................................................... 1 Palomar Procedures

290

Federal Agency NEPA Procedures  

Broader source: Energy.gov [DOE]

Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

291

The UC Davis Emerging Lithium Battery Test Project  

E-Print Network [OSTI]

35 degC to 150 degC 4. Test procedures The various cells anda consistent set of test procedures intended to determineapplications. The test procedures are summarized in Table 4.

Burke, Andy; Miller, Marshall

2009-01-01T23:59:59.000Z

292

Sampling procedure for atmospheric geothermal brines  

SciTech Connect (OSTI)

Thermodynamic and chemical changes can alter the characteristics of geothermal brine samples significantly. A procedure which minimizes these changes has been developed for sampling atmospheric geothermal brines. The method is fast with minimal cooling and yields representative samples which have been stabilized to preserve their integrity. The procedure provides reliable suspended solids data and both the solid and liquid samples are suitable for elemental analysis. The procedure is also a valuable tool to aid in monitoring a geothermal brine conditioning system. Data are included from a flow test at an MCR Geothermal well in the Imperial Valley area of California to illustrate the utility of the sampling procedure.

Kochelek, J.T.; Zienty, D.F.

1981-10-01T23:59:59.000Z

293

IPv6 Implementation Checklist  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

IPv6 Implementation Checklist Engineering Services The Network OSCARS Fasterdata IPv6 Network IPv6 Implementation Checklist ESnet IPv6 Mirror Servers ESnet IPv6 History ESnet...

294

Implementation of an Enhanced Measurement Control Program for handling nuclear safety samples at WSRC  

SciTech Connect (OSTI)

In the separation and purification of nuclear material, nuclear criticality safety (NCS) is of primary concern. The primary nuclear criticality safety controls utilized by the Savannah River Site (SRS) Separations Facilities involve administrative and process equipment controls. Additional assurance of NCS is obtained by identifying key process hold points where sampling is used to independently verify the effectiveness of production control. Nuclear safety measurements of samples from these key process locations provide a high degree of assurance that processing conditions are within administrative and procedural nuclear safety controls. An enhanced procedure management system aimed at making improvements in the quality, safety, and conduct of operation was implemented for Nuclear Safety Sample (NSS) receipt, analysis, and reporting. All procedures with nuclear safety implications were reviewed for accuracy and adequate detail to perform the analytical measurements safely, efficiently, and with the utmost quality. Laboratory personnel worked in a Deliberate Operating'' mode (a systematic process requiring continuous expert oversight during all phases of training, testing, and implementation) to initiate the upgrades. Thus, the effort to revise and review nuclear safety sample procedures involved a team comprised of a supervisor, chemist, and two technicians for each procedure. Each NSS procedure was upgraded to a Use Every Time'' (UET) procedure with sign-off steps to ensure compliance with each step for every nuclear safety sample analyzed. The upgrade program met and exceeded both the long and short term customer needs by improving measurement reliability, providing objective evidence of rigid adherence to program principles and requirements, and enhancing the system for independent verification of representative sampling from designated NCS points.

Boler-Melton, C.; Holland, M.K.

1991-01-01T23:59:59.000Z

295

Collector subsystem official performance test: Test Procedure 118. Revision A  

SciTech Connect (OSTI)

The first objective is to demonstrate the heliostat beam quality by taking beam quality data with the BCS. Beam quality data, shall be taken at two different times per day for each heliostat. Beam quality data for a group of ten heliostats at a given time will be combined as follows to yield a composite beam shape for the group: the centroids of each beam shape will be superimposed by the BCS; the flux values at each BCS grid point will be numerically summed; and the summed fluxes at each point will be divided by ten. The composite beam shape for each group of heliostats will be assumed to represent the beam shape of a single heliostat in the group and will be analyzed using HELIOS to ASSESS compliance with the beam quality specification over the operating temperature range. The second objective is to demonstrate that the beam centroid tracking error for each heliostat is within the tracking error specification. Beam centroid tracking data shall be acquired using BCS. Tracking error data for each heliostat will be compared with the specification value of the RMS error.

Rose, G.R.

1981-09-01T23:59:59.000Z

296

Implementing Executive Order 13423  

Broader source: Energy.gov [DOE]

Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423.

297

Making Business Process Implementations Flexible and Robust  

E-Print Network [OSTI]

in coping with errors and exceptional situations. In particular, we focus on new error handling proceduresMaking Business Process Implementations Flexible and Robust: Error Handling in the AristaFlow BPM on process management technology one fundamental goal is to ensure robustness of the realized process

Pfeifer, Holger

298

UC SANTA BARBARA POLICY AND PROCEDURE Implementing Procedures for the University Whistleblower Protection Policy  

E-Print Network [OSTI]

for Protection of Whistleblowers from Retaliation and Guidelines for Reviewing Retaliation Complaints (also known evaluation, suspension, or other disciplinary action. F. Retaliation Complaint Any written complaint

Liebling, Michael

299

Performance testing framework for smart grid communication network  

Science Journals Connector (OSTI)

Smart grid communication network is comprised of different communication mediums and technologies. Performance evaluation is one of the main concerns in smart grid communication system. In any smart grid communication implementation, to determine the performance factor of the network, a testing of an end-to-end process flow is required. Therefore, an effective and coordinated testing procedure plays a crucial role in evaluating the performance of smart grid communications. In this paper, a testing framework is proposed as a guideline to analyze and assess the performance of smart grid communication network.

D N Quang; O H See; L L Chee; C Y Xuen; S Karuppiah

2013-01-01T23:59:59.000Z

300

Appropriateness Criteria and Elective Procedures Total Joint Arthroplasty  

Science Journals Connector (OSTI)

...the importance of such criteria and have already started developing them as guidelines for other orthopedic procedures. Second, accountable care organizations and other institutions pursuing similar health care delivery models are becoming influential, and as they move away from procedure-based payments... The implementation of appropriateness criteria that help to identify the patients likely to benefit most from a given procedure could help to combat increasing health care costs while enhancing access and quality. Total joint arthroplasty offers a prime example.

Ghomrawi H.M.K.Schackman B.R.Mushlin A.I.

2012-12-27T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Cable Measuring Engine Operation Procedures  

E-Print Network [OSTI]

MEASURING ENGINE OPERATION PROCEDURES LBNL-40565 SC-MAG-597MEASURING ENGINE OPERATION PROCEDURES INDEX IN T ROD U C TCALIBRATION PROCEDURE . .

Authors, Various

2011-01-01T23:59:59.000Z

302

ARM - Publications Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govPublicationsPublications Procedures Page Contents Types of ARM Publications Process for Publishing Planning Documents Science Reports Conference Documents Public Information...

303

TRANSPARENCY RECYCLING PROGRAM PROCEDURES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

used overhead transparencies RECYCLE them for REUSE. It's Easy Follow these simple procedures: 1.) COLLECT used transparencies to be recycled. 2.) SEPARATE the transparencies...

304

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

305

Teaching Physician Guidelines for Surgical Procedures Minor Surgical Procedures  

E-Print Network [OSTI]

Teaching Physician Guidelines for Surgical Procedures Minor Surgical Procedures: § Procedures, the teaching physician must be present for the entire procedure § Teaching physician or resident may document the teaching physician's presence for the entire procedure High Risk and Complex Surgical Procedures

Goldman, Steven A.

306

Improvements to laboratory-scale maize wet-milling procedures  

Science Journals Connector (OSTI)

The wet milling of maize is difficult to study in the laboratory because some of the required separation steps are challenging to implement at bench-scale. This work was conducted to develop an improved 100-g wet-milling procedure that better models the industrial process. Several separation steps were modified from previously reported methods. Among the changes, germ was recovered by a flotation/skimming technique that is normally used on larger-scale procedures. Starch was recovered by tabling, but the flow profile at the end of the table was changed to reduce gluten settling and the partitioning and pumping of slurry fractions was changed to allow the tabling process to begin immediately after fiber recovery. Gluten was dewatering directly on the table overflow, and starch was recovered from the table before drying. These modifications eliminated some problems associated with other procedures, e.g. the scraping of tabled starch to reduce protein contamination, the loss of germ due to size reduction, and the separate recovery of coarse and fine fiber fractions. Compared with routine tabling methods, the modified method used in this work produced starch with less protein (0.42 versus 0.55% for the maize variety tested); however, the improvement was achieved at the expense of a slightly lower starch yield (64.4 versus 65.4%). Standard deviations for the product yields were 0.28% for starch, 0.27% for gluten, 0.24% for fiber, 0.13% for germ, and 0.07% for total solubles. The procedure will be beneficial for some maize wet-milling experiments.

Michael K. Dowd

2003-01-01T23:59:59.000Z

307

Information Incident Response Procedure  

E-Print Network [OSTI]

Information Incident Response Procedure Authority The Information Incident Response Procedure (IIRP) is authorized under the UWM Information Security Policy S59; section III-D (http://www4.uwm Information Security Office, and UWM Internal Audit. This document will be reviewed and updated annually

Saldin, Dilano

308

Text Redelegation Procedures - DOE Directives, Delegations, and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Text Redelegation Procedures by Website Administrator Delegation Procedures Redelegation Procedures Redelegation Procedures for Functional Area Managers This page contains...

309

Procedures and Instructions | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Records Management Procedures and Instructions Procedures and Instructions Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for...

310

Redelegation Procedures - DOE Directives, Delegations, and Requirement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Redelegation Procedures by Website Administrator Text version available here. Delegation Procedures Re-Delegation Procedures Document Actions Redelegation Procedures Redelegating...

311

ORISE: Policy Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program...

312

Past DOE Technical Standards Program Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Past DOE Technical Standards Program Procedures Past DOE Technical Standards Program Procedures Past DOE Technical Standards Program Procedures TSPP July 2009 September 26, 2009 DOE-TSPP-0, Technical Standards Program Procedures - July 1, 2009 This document is the summary page for all of the DOE Technical Standards Program Procedures. August 26, 2009 DOE-TSPP-1, Technical Standards Program Responsibilities - July 1, 2009 This procedure describes the responsibilities of persons who are charged with implementing the DOE Technical Standards Program. August 26, 2009 DOE-TSPP-2, Establishing the Need for a Technical Standard - July 1, 2009 This procedure provides guidance for the routine maintenance of DOE Technical Standards. August 26, 2009 DOE-TSPP-3, Use of Non-Government Standards and Interaction with Non-Government Standards Bodies - July 1, 2009

313

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

314

Implementing AccountableCare  

E-Print Network [OSTI]

Implementing AccountableCare Organizations POLICYBRIEF MAY2010 ADVANCING NATIONAL HEALTH REFORMPolicyandClinicalPractice #12;i Berkeley Center on Health, Economic & Family Security|Implementing Accountable Care to implement the newly-minted comprehensive healthcare reform law, the Patient Protection and Affordable Care

Kammen, Daniel M.

315

HYDRATE CORE DRILLING TESTS  

SciTech Connect (OSTI)

The ''Methane Hydrate Production from Alaskan Permafrost'' project is a three-year endeavor being conducted by Maurer Technology Inc. (MTI), Noble, and Anadarko Petroleum, in partnership with the U.S. DOE National Energy Technology Laboratory (NETL). The project's goal is to build on previous and ongoing R&D in the area of onshore hydrate deposition. The project team plans to design and implement a program to safely and economically drill, core and produce gas from arctic hydrates. The current work scope includes drilling and coring one well on Anadarko leases in FY 2003 during the winter drilling season. A specially built on-site core analysis laboratory will be used to determine some of the physical characteristics of the hydrates and surrounding rock. Prior to going to the field, the project team designed and conducted a controlled series of coring tests for simulating coring of hydrate formations. A variety of equipment and procedures were tested and modified to develop a practical solution for this special application. This Topical Report summarizes these coring tests. A special facility was designed and installed at MTI's Drilling Research Center (DRC) in Houston and used to conduct coring tests. Equipment and procedures were tested by cutting cores from frozen mixtures of sand and water supported by casing and designed to simulate hydrate formations. Tests were conducted with chilled drilling fluids. Tests showed that frozen core can be washed out and reduced in size by the action of the drilling fluid. Washing of the core by the drilling fluid caused a reduction in core diameter, making core recovery very difficult (if not impossible). One successful solution was to drill the last 6 inches of core dry (without fluid circulation). These tests demonstrated that it will be difficult to capture core when drilling in permafrost or hydrates without implementing certain safeguards. Among the coring tests was a simulated hydrate formation comprised of coarse, large-grain sand in ice. Results with this core showed that the viscosity of the drilling fluid must also be carefully controlled. When coarse sand was being cored, the core barrel became stuck because the drilling fluid was not viscous enough to completely remove the large grains of sand. These tests were very valuable to the project by showing the difficulties in coring permafrost or hydrates in a laboratory environment (as opposed to a field environment where drilling costs are much higher and the potential loss of equipment greater). Among the conclusions reached from these simulated hydrate coring tests are the following: Frozen hydrate core samples can be recovered successfully; A spring-finger core catcher works best for catching hydrate cores; Drilling fluid can erode the core and reduces its diameter, making it more difficult to capture the core; Mud must be designed with proper viscosity to lift larger cuttings; and The bottom 6 inches of core may need to be drilled dry to capture the core successfully.

John H. Cohen; Thomas E. Williams; Ali G. Kadaster; Bill V. Liddell

2002-11-01T23:59:59.000Z

316

Acceptance test report for core sample trucks 3 and 4  

SciTech Connect (OSTI)

The purpose of this Acceptance Test Report is to provide documentation for the acceptance testing of the rotary mode core sample trucks 3 and 4, designated as HO-68K-4600 and HO-68K-4647, respectively. This report conforms to the guidelines established in WHC-IP-1026, ``Engineering Practice Guidelines,`` Appendix M, ``Acceptance Test Procedures and Reports.`` Rotary mode core sample trucks 3 and 4 were based upon the design of the second core sample truck (HO-68K-4345) which was constructed to implement rotary mode sampling of the waste tanks at Hanford. Successful completion of acceptance testing on June 30, 1995 verified that all design requirements were met. This report is divided into four sections, beginning with general information. Acceptance testing was performed on trucks 3 and 4 during the months of March through June, 1995. All testing was performed at the ``Rock Slinger`` test site in the 200 West area. The sequence of testing was determined by equipment availability, and the initial revision of the Acceptance Test Procedure (ATP) was used for both trucks. Testing was directed by ICF-KH, with the support of WHC Characterization Equipment Engineering and Characterization Project Operations. Testing was completed per the ATP without discrepancies or deviations, except as noted.

Corbett, J.E.

1996-04-10T23:59:59.000Z

317

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

E-Print Network [OSTI]

of AEPSC. DTC Registered Procedure CERTS Microgrid Test PlanTarget Group: Assigned Procedure Review Date: 23 Feb. 2008document is to establish procedures for testing of the CERTS

Eto, Joseph H.

2008-01-01T23:59:59.000Z

318

CRAD, Implementation Verification Review - July 20, 2011 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Implementation Verification Review - July 20, 2011 Implementation Verification Review - July 20, 2011 CRAD, Implementation Verification Review - July 20, 2011 July 20, 2011 Implementation Verification Review of Safety Basis Hazard Controls (HSS CRAD 45-39, Rev. 1) The Implementation Verification Review (IVR) inspection will evaluate the effectiveness of processes for independently verifying and re-verifying implementation of the safety basis hazard controls at the site's nuclear facilities and associated site office oversight methodology. The inspection will consist of an evaluation of the procedures and processes that establish the IVR or similar process, as well as an evaluation of IVR or similar processes implementation and oversight. Review of implementation at a site may include any or all of the following activities:

319

Procedures in Modules (1) Including all procedures within modules  

E-Print Network [OSTI]

Procedures in Modules (1) Including all procedures within modules works very well in almost all designing these if possible #12;Procedures in Modules (2) These are very much like internal procedures Works very well in almost all programs Everything accessible in the module can also be used in the procedure

320

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NFRC Procedures for Laminates  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laminates Laminates Last update: 12/10/2013 07:29 PM NFRC now has a procedure for making laminates in Optics5 and importing those laminate constructions into WINDOW5 to be used in a whole product calculation. The information presented below is provided to help simulators with this process. Feel free to contact us at WINDOWHelp@lbl.gov with questions or comments. NFRC Laminate Procedure Laminate Procedures (approved by NFRC) (PDF file) Approved Interlayer List (IGDB 33.0) (PDF file) NFRC Laminate Procedure Training Powerpoint with Examples (This Powerpoint presentation was used in the NFRC web based training sessions in December 2006 and January 2007) PowerPoint Presentation (PPT file) PowerPoint Presentation (PDF file) Help and Troubleshooting Error Messages The table below contains common warnings and error messages that may appear in Optics5 when calculating a laminate. Some of the messages can be ignored, and some are significant, which is indicated in the table.

322

Quiz Policies and Procedures  

E-Print Network [OSTI]

Quiz Policies and Procedures. 1. Studying the lesson notes and completing most of the homework problems prior to class is the best way to prepare for a quiz. 2.

Bailey, Charlotte M

2014-08-19T23:59:59.000Z

323

PROCEDURE FOR PREPARING  

Broader source: Energy.gov (indexed) [DOE]

PROCEDURE FOR PREPARING PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) Revision 1 November 1, 2007 Records Management Division, IM-23 PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) 1. If the records have not yet been inventoried, see "Procedure for Conducting a Records Inventory." An inventory must be completed prior to preparing the RIDS. 2. The Records Inventory and Disposition Schedules (RIDS) should be reviewed and updated at least annually on DOE F 1324.10 and DOE F 1324.9. The RIDS covers all record, administrative and programmatic, as well as non- record material. The RIDS must include: a. Complete and detailed information identifying the organization (s) responsible for the records.

324

Statistical simulation procedures  

E-Print Network [OSTI]

. Ringer This thesis investicates methods for estimating statistical distribution functions which cannot be easily solved by theoretical techniques. The stratified Ilonte Carlo procedure of Ringer and Suharto [11j is extended to the multivariate case... and applied to two probIems, one practical, the other theoretical. This procedure Is shown to be more precise than simple Monte Carlo simula- t. i on. numerical method proposed by Soserville [12j is also extended to the multivariate case, and compared...

Tremelling, Robert Norman

2012-06-07T23:59:59.000Z

325

Guide to good practices for the design, development, and implementation of examinations  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide direction to training personnel in the broad areas of design, development, and implementation of examinations. Nuclear facilities spend a significant amount of training resources testing trainees. Tests are used for employee selection, qualification, requalification, certification and recertification, and promotion. Ineffective testing procedures, or inappropriate interpretation of test results, can have significant effects on both human performance and facility operations. Test development requires unique skills, and as with any skill, training and experience are needed to develop the skills. Test development, test use, test result interpretation, and test refinement, like all other aspects of the systematic approach to training, should be part of an ongoing, systematic process. For some users this document will provide a review of ideas and principles with which they are already familiar; for others it will present new concepts. While not intended to provide in-depth coverage of test theory design and development, it should provide developers, instructors, and evaluators with a foundation on which to develop sound examinations.

NONE

1997-06-01T23:59:59.000Z

326

Regulations and Procedures Manual  

E-Print Network [OSTI]

Employees in Testing-Designated Positions (TDPs) Employeesare designated as a testing-designated position (TDP) areEmployees in Non-Testing-Designated Positions (TDPs) (a.k.a.

Young, Lydia J.

2014-01-01T23:59:59.000Z

327

Adaptive Test Cost and Quality Optimization Through An Effective Yet Efficient Delivery of Chip Specific Tests /  

E-Print Network [OSTI]

S. Ha, "On the Generation of Test Patterns for CombinationalDesign, Implementation and Analysis of Test Experiments,"in International Test Conference, 2006. P. Nigh, W. Needham,

Arslan, Baris

2013-01-01T23:59:59.000Z

328

Current networks require ad-hoc operating procedures by expert administrators to handle  

E-Print Network [OSTI]

1 Abstract Current networks require ad-hoc operating procedures by expert administrators to handle and operational procedures; and coordinate these changes with those caused by built-in element procedures ­ handle implemented in two complementary versions and is now being applied to automate several configuration

Yemini, Yechiam

329

Alabama Compliance Implementation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alabama Alabama Compliance Implementation and Evaluation (CIE) Guide BUILDING TECHNOLOGIES PROGRAM COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 2 This Guide is designed to assist state and local code jurisdictions in achieving statewide compliance with the 2009 International Energy Conservation Code (IECC) for residential buildings and ANSI/ASHRAE/IESNA Standard 90.1-2007 for commercial buildings. COMPLIANCE IMPLEMENTATION AND EVALUATION (CIE) GUIDE 3 Alabama WHAT'S INSIDE CIE Guide Overview-Flow Diagram ........................................................................................................................... 5 PART 1: Guide Overview .................................................................................................................................................

330

October 2014 Implementation Manual  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

system is reviewed for potential efficiency improvements including lower flows, reduced pipeline friction and repair of leaks. Implementation Manual (10114) - Section 6:...

331

PHYSICAL OCEANOGRAPHY OF THE TEST AREA  

Science Journals Connector (OSTI)

PHYSICAL OCEANOGRAPHY OF TIIE TEST AREA. PAUL L. HORRER. PROCEDURE. Current Measurements. Methods of determining currents arc varied.

1999-12-23T23:59:59.000Z

332

Code of Federal Regulations Procedural Rules for DOE Nuclear Activities  

Broader source: Energy.gov (indexed) [DOE]

Code of Federal Regulations Procedural Rules for DOE Nuclear Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules,

333

Unified Procedures Applicable to Major Federal Actions Relating to Nuclear  

Broader source: Energy.gov (indexed) [DOE]

Unified Procedures Applicable to Major Federal Actions Relating to Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 44 Fed Reg 65560) Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 (State Department, 44 Fed Reg 65560) The following unified procedures issued by the State Department are established to satisfy the requirement of the Executive Order for implementing procedures concerning nuclear export activities of Federal agencies. 44 Fed Reg 65560: Department of State: Unified Procedures Applicable to Major Federal Actions Relating to Nuclear Activities Subject to Executive Order 12114 More Documents & Publications Environmental Effects Abroad of Major Federal Actions

334

Awardee Share Procedures  

Broader source: Energy.gov (indexed) [DOE]

Awardee Share Procedures Awardee Share Procedures Procedures for Correctly Reporting Awardee Share on the FAADS/FAADS Plus reporting screen in STRIPES To ensure proper reporting by DOE to USASpending.gov, you must enter the awardee share (also known as the cost share, recipient share, and non-federal share) manually on the FAADS/FAADS Plus reporting screen in STRIPES. The FAADS/FAADS Plus file is the financial assistance equivalent of the FPDS-NG data entry for acquisition awards. The awardee share amount is not system generated on the FAADS/FAADS Plus reporting screen like the obligation amount is. The fields on the FAADS/FAADS Plus form which must be entered when reporting a Cost-share Financial Assistance Award are: Field #17 Non-Federal Funding Sign Choose 'Obligation', which refers to a positive amount (sign), or 'Deobligation', which refers to a

335

Radiation Emergency Procedure Demonstrations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Managing Radiation Emergencies Managing Radiation Emergencies Procedure Demonstrations Procedure Demonstrations Note: RealPlayer is needed for listening to the narration that accompany these demonstrations. Real Player Dressing To Prevent the Spread of Radioactive Contamination This demonstration shows how your team can dress to prevent the spread of radioactive contamination. Click to begin presentation on dressing to prevent the spread of radioactive contamination. Preparing The Area This demonstration shows basic steps you can take to gather equipment and prepare a room to receive a patient who may be contaminated with radioactive material. Click to begin presentation on preparing a room to receive a radioactive contaminated patient. Removing Contaminated Clothing This demonstration shows the procedure for removing clothing from a patient who may be contaminated with radioactive material.

336

Evidence in European Asylum Procedures.  

E-Print Network [OSTI]

??This thesis explores the particular framework of evidentiary assessment of three selected appellate national asylum procedures in Europe and discusses the relationship between these procedures, (more)

Staffans, Ida

2011-01-01T23:59:59.000Z

337

Karen Nunez, Procedures Center Manager  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Karen Nunez, Procedures Center Manager Print Procedures Center Manager Karen Nunez has been working somewhat "behind the scenes" at the ALS for the past seven years, ensuring that...

338

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network [OSTI]

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

339

Emergency Procedures | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Services Employee Services Safety and Health Emergency Procedures Emergency Procedures Note: This page is pending deletion, please refer to the Safety and health main page...

340

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to  

E-Print Network [OSTI]

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to: _________________________________ Class Time: __________ - __________ _________ Test Date: _______________________________ Time allotted): ____________________________ INSTRUCTOR PROCEDURES: 1. Please deliver tests to WYLY TOWER 318 at least 24 hours PRIOR to test time

Selmic, Sandra

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

342

Current Human Reliability Analysis Methods Applied to Computerized Procedures  

SciTech Connect (OSTI)

Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no US nuclear power plant has implemented CPs in its main control room (Fink et al., 2009). Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of enhanced ease of use and easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

Ronald L. Boring

2012-06-01T23:59:59.000Z

343

Agile Testing Methods for IC Radios.  

E-Print Network [OSTI]

??This thesis concentrates on the development of a new testing procedure for the radio used in Broadcom?s WLAN and cellular chips. Verification and hardware testing (more)

Martinez, Luis

2011-01-01T23:59:59.000Z

344

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

345

OPERATING POLICY AND PROCEDURE PHYSICAL PLANT  

E-Print Network [OSTI]

/lockout and safety-related work practices shall be employed to protect all employees from electrical shock or other. The electrical potential has been removed and they have been tested, verified and red tagged/locked as having Policy and Procedure (PP/OP) is to provide electrical safety related work practices for nonqualified

Gelfond, Michael

346

EMERGENCY PLANNING AND PROCEDURES  

E-Print Network [OSTI]

EMERGENCY PLANNING AND PROCEDURES HANDBOOK FOR CWRU EMPLOYEES August 2013 #12;CWRU EMERGENCY innovation, technology, teamwork, public- private co- operation and vigilance. Mission Statement We increase appropriately to any crisis or emergency. This handbook is comprehensive and provides employees with information

Cavusoglu, Cenk

347

EMERGENCY PLANNING AND PROCEDURES  

E-Print Network [OSTI]

EMERGENCY PLANNING AND PROCEDURES HANDBOOK FOR CWRU STUDENTS August 2013 #12;CWRU EMERGENCY innovation, technology, teamwork, public- private co- operation and vigilance. Mission Statement We increase. This handbook is comprehensive and provides studetns with information on how to prepare for and respond

Cavusoglu, Cenk

348

BOMB THREAT CALL PROCEDURES  

E-Print Network [OSTI]

THREAT CALL PROCEDURES BOMB THREAT CHECKLIST Date: Time: Time Caller Phone Number Where Hung Up: Call Received:Most bomb threats are received by phone. Bomb threats are serious until proven otherwise. Act threat is received by phone: 1. Remain calm. Keep the caller on the line for as long as possible. DO

Guo, Ting

349

BOMB THREAT CALL PROCEDURES  

E-Print Network [OSTI]

BOMB THREAT CALL PROCEDURES WHO TO CONTACT (select one) · Follow your local guidelines · Federal Protective Service (FPS) Police 1-877-4-FPS-411 (1-877-437-7411) · 911 Most bomb threats are received by phone. Bomb threats are serious until proven otherwise. Act quickly, but remain calm and obtain

Boyce, Richard L.

350

Building Programming List Procedures  

E-Print Network [OSTI]

1 6.090 Building Programming Experience Lecture 4 1/16/2007 Outline · List Procedures · Compound)) (define (reverse-helper l r) (if (null? l) r (reverse-helper (cdr l) (cons (car l) r)))) list-ref · Write

351

EMERGENCY PROCEDURES --2013 INFORMATION  

E-Print Network [OSTI]

quickly, remain calm. Take personal items (keys, purse, wallet, coat, shoes) Secure any hazardous procedures. SHOOTING INCIDENT If shooter is outside building: Turn off lights, lock windows and doors, close police. If shooter is inside the building: If safe to exit, flee. Call 9-1-1 to give location. Do

352

EMERGENCY PROCEDURES --2014 INFORMATION  

E-Print Network [OSTI]

hazardous materials. Close door when you exit. Go to evacuation assembly point designated by evacu- ation procedures. SHOOTING INCIDENT If shooter is outside building: Turn off lights, lock windows and doors, close of uniformed police. If shooter is inside the building: If safe to exit, flee. Call 9-1-1 to give location

353

A new guide for commissioning air handling systems: Using a model functional test  

SciTech Connect (OSTI)

Functional tests are a set of detailed instructions for building commissioning that demand extensive HVAC system knowledge to write and perform. Understanding the energy use implications and theory behind the test procedures, estimating the costs and benefits of doing a particular test, implementing the tests correctly, and resolving problems require years of field experience. As part of a large research project now underway, a practical guide is being developed that communicates this knowledge. This paper presents the components and intended use of the Functional Testing Guide and Model Functional Test for Air Handling Systems. A series of model functional tests, starting at the outdoor air intake section and proceeding through the air handling unit, distribution system, and terminal equipment and ending at the exhaust air discharge point, are provided for many commonly installed air handling system configurations. The model functional tests contain advice for tailoring the test procedures to specific system configurations, desirable and undesirable testing outcomes, a calculation appendix, references to other resources, and examples of completed test forms. The guide is an educational resource, with background information that clarifies the principles behind testing configurations and results. The functional tests have been selected from an extensive commissioning test protocol library compiled by Pacific Gas and Electric in 2001. The guide also includes a design guideline for the selection of control and monitoring points and a design intent documentation form.

Haasl, Tudi; Sellers, David; Friedman, Hannah; Piette, Mary Ann; Bourassa, Norman; Gillespie, Ken

2002-05-01T23:59:59.000Z

354

Implementation Proposal for  

Broader source: Energy.gov (indexed) [DOE]

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

355

Guide to good practices for the development of test items  

SciTech Connect (OSTI)

While the methodology used in developing test items can vary significantly, to ensure quality examinations, test items should be developed systematically. Test design and development is discussed in the DOE Guide to Good Practices for Design, Development, and Implementation of Examinations. This guide is intended to be a supplement by providing more detailed guidance on the development of specific test items. This guide addresses the development of written examination test items primarily. However, many of the concepts also apply to oral examinations, both in the classroom and on the job. This guide is intended to be used as guidance for the classroom and laboratory instructor or curriculum developer responsible for the construction of individual test items. This document focuses on written test items, but includes information relative to open-reference (open book) examination test items, as well. These test items have been categorized as short-answer, multiple-choice, or essay. Each test item format is described, examples are provided, and a procedure for development is included. The appendices provide examples for writing test items, a test item development form, and examples of various test item formats.

NONE

1997-01-01T23:59:59.000Z

356

Procedures for Departing Employees | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures (2)3.12.12.pdf More Documents & Publications Procedures for Departing Employees Records...

357

Procedures for Departing Employees | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Procedures for Departing Employees Procedures for Departing Employees RM Exit Procedures.doc More Documents & Publications Procedures for Departing Employees Records Management...

358

Unveiling the Implementation Guide  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory www.ornl.gov Oak Ridge National Laboratory www.ornl.gov Unveiling the Implementation Guide October 11, 2011 Michaela Martin Program Manager Residential, Commercial, and Industrial Energy Efficiency Oak Ridge National Laboratory 2 | Oak Ridge National Laboratory www.ornl.gov Guiding Principles for Successfully Implementing Industrial Energy Assessment Recommendations * New resource for industry * Identifies key principles and actions that lead to successful implementation of energy assessment recommendations * Connects readers with a variety of trusted resources * Simple tools for supporting energy management programs and continuous energy performance improvement efforts * Available in hard copy and on the web Implementation Guide Overview 3 | Oak Ridge National Laboratory www.ornl.gov

359

Implementing Turtle Graphics...  

Science Journals Connector (OSTI)

Turtle Graphics were invented by Seymour Papert in ... drawn on the screen by an (imaginary) turtle which happens to be carrying a pen ... trace is left. In some implementations the turtle is a robot, and the nam...

Robin Jones; Ian Stewart

1987-01-01T23:59:59.000Z

360

INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE  

Broader source: Energy.gov (indexed) [DOE]

March 29, 2007 INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" i Contents I. Introduction ......................................................................................................................1 A. Purpose..................................................................................................................1 B. Authority ...............................................................................................................1 C. Organization and Oversight ..................................................................................1 D. Overarching Policy and Directives .......................................................................4

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

TRANSPARENCY RECYCLING PROGRAM PROCEDURES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

TRANSPARENCY RECYCLING Don't throw out your used overhead transparencies! RECYCLE them for REUSE. It's Easy! Follow these simple procedures: 1.) COLLECT used transparencies to be recycled. 2.) SEPARATE the transparencies from ringed binders, plastic or paper folders, envelopes, and/or files. 3.) PLACE the transparencies (only) into an intra-laboratory mail envelope. 4.) SEND the envelope to: Terri Schneider, Building 201, 1D-10. Terri will prepare a

362

Department of Energy Technical Standards Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Department Department of Energy Technical Standards Procedures Department of Energy Technical Standards Procedures The following procedures should be used to write, revise, or maintain a DOE technical standard. They are also used to convert a DOE technical standard to a non-government standard or to form a topical committee. TSPP September 2013 September 16, 2013 DOE-TSPP-1-2013, Program Overview and Responsibilities This procedure describes the responsibilities of persons who are charged with implementing the Department of Energy (DOE) Technical Standards Program (TSP). September 16, 2013 DOE-TSPP-2-2013, Initiating DOE Technical Standards This procedure provides guidance on how to establish and justify the need for a Department of Energy (DOE) Technical Standard and register a DOE

363

Health and Safety Responsibilities Procedures Category: Campus Life  

E-Print Network [OSTI]

24/04/2013 Health and Safety Responsibilities Procedures Category: Campus Life 1. LEGISLATION/ENTERPRISE AGREEMENT/POLICY SUPPORTED Health and Safety Policy Occupational Safety and Health Act 1984 Occupational Safety and Health Regulations 1996 2. IMPLEMENTATION PRINCIPLES 2.1. Curtin University Management

364

Index of /research/alcator/facility/Procedures/POWER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

POWER ICO Name Last modified Size Description DIR Parent Directory - TXT BUSINSTRUCALIBRATION.TXT 17-Dec-1999 17:16 2.3K EF1U and EF1L Gate Test Procedure.pdf...

365

Energy Metering Audit Procedure  

E-Print Network [OSTI]

Energy Meterilg Audtt Procedure Wiliam S Whitaker Engineering Specialist T X E INC. laPorte Texas INTROOUCI'ION This paper describes the recent audit of the utility distriooticn meters in a petrochanica1 plant. These meters measure the steam..., cx:ndensate, natural gas, water, nitrogen and air flCMS to the different process units within the plant. This audit started as an attellPt to resolve discrepan::ies between the 650 PSIG steam distriootion and supply meters. Theoretically the sum...

Whitaker, W. S.

366

Surface cleanliness measurement procedure  

DOE Patents [OSTI]

A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

Schroder, Mark Stewart (Hendersonville, NC); Woodmansee, Donald Ernest (Simpsonville, SC); Beadie, Douglas Frank (Greenville, SC)

2002-01-01T23:59:59.000Z

367

Federal Acquisition Circular 2005-39 Item I--Extend Use of Simplified Acquisition Procedures for Certain Commercial Items (FAR  

Broader source: Energy.gov (indexed) [DOE]

39 39 Item I--Extend Use of Simplified Acquisition Procedures for Certain Commercial Items (FAR Case 2009-035) This final rule amends the FAR to implement section 81 6 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 201 0. The rule extends for two more years the commercial items test program in FAR subpart 13.5. The program was to expire January 1, 2010. Item 11--Clarification of Submission of Cost or Pricing Data on Non-Commercial Modifications of Commercial Items (FAR Case 2008-0 12) This final rule adopts, with minor changes, the interim rule published in the Federal Register at 74 FR 1 1826 on March 19,2009. The interim rule amended the FAR to implement section 8 14 of the NDAA for FY 2008. Section 8 14 requires the harmonization of the threshold for cost

368

ON CONSISTENCY OF BAYES PROCEDURES  

Science Journals Connector (OSTI)

ON CONSISTENCY OF BAYES PROCEDURES Loraine Schwartz DEPARTMENT OF MATHEMATICS, UNIVERSITY OF BRITISH COLUMBIA...COLUMBIA. | Journal Article ON CONSISTENCY OF BAYES PROCEDURES BY LORAINE SCHWARTZ DEPARTMENT OF MATHEMATICS, UNIVERSITY OF BRITISH COLUMBIA...

Loraine Schwartz

1964-01-01T23:59:59.000Z

369

PICs Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

370

Implementing the National Broadband  

Broader source: Energy.gov (indexed) [DOE]

Type text] Type text] Response to Request for Information from the Department of Energy: Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy [FR Doc. 2010-11127] July 12, 2010 EnerNOC Page 2 of 8 EnerNOC, Inc. ("EnerNOC") is pleased to provide these comments to the Department of Energy in response to the Request for Information "Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy." EnerNOC is a provider of demand response and energy efficiency solutions to utilities, Independent

371

Permanent Markers Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

372

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

373

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

374

Shrinking Procedures and Optimal Algorithms  

E-Print Network [OSTI]

Jun 18, 2012 ... Optimal Stochastic Approximation Algorithms for Strongly Convex Stochastic Composite Optimization, II: Shrinking Procedures and Optimal...

Saeed Ghadimi

2012-06-18T23:59:59.000Z

375

An Update on Proposed Changes to the Energy Department's LNG Export Decision-Making Procedures  

Broader source: Energy.gov [DOE]

After receiving numerous comments about a proposed procedural change to the Energy Department's liquified natural gas export decision-making process, the Department is finalizing its decision to implement the change.

376

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry/Biotechnology Graduate Program. A detailed account of the academic requirements and procedures is provided for graduate students in chemistry; to promote consistency in procedures and standards; and to provide a basis for communication between

Kounaves, Samuel P.

377

Postgraduate Admissions Policy and Procedures  

E-Print Network [OSTI]

1 Postgraduate Admissions Policy and Procedures SCOPE OF POLICY This policy applies to all to both staff and applicants on the University's procedures for admitting postgraduate students PROCEDURES 5 3.1 Making an application 5 3.2 Application deadlines 5 3.3 Accreditation of Prior Learning (APL

378

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF THE UNIVERSITY LIBRARIAN University Policy PURPOSE 1.00 The following procedures define the method by which the appointment, or review and re-appointment, of the university librarian will be conducted. SCOPE 2.00 These procedures apply to: the appointment of a new

Victoria, University of

379

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

Page | 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF ACADEMIC ASSOCIATE VICE Review: February, 2018 PURPOSE 1.00 The following procedures define the method by which the appointment.00 These procedures apply to the appointment and reappointment of academic Associate Vice-Presidents. An Academic

Victoria, University of

380

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

Page | 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF DEANS University Policy No: GV0450 procedures define the method by which the appointment, or review and re-appointment, of deans will be conducted. SCOPE 2.00 These procedures apply to: the appointments of new deans, the review and re

Victoria, University of

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Handbook of Academic Requirements & Procedures  

E-Print Network [OSTI]

Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE and procedures is provided. The intent is to describe the programs and explain the rationale behind them of the Department; to promote consistency in procedures and standards; and to provide a basis for communication

Kounaves, Samuel P.

382

PROCEDURES FOR THE APPOINTMENT AND  

E-Print Network [OSTI]

Page 1 PROCEDURES FOR THE APPOINTMENT AND RE-APPOINTMENT OF THE ASSOCIATE DEAN ACADEMIC ADVISING Last Editorial Change: Mandated Review: May, 2018 PURPOSE 1.00 The following procedures define (Faculties of Science, Social Sciences and Humanities) will be conducted. SCOPE 2.00 These procedures apply

Victoria, University of

383

Capital Projects Delivery Procedures Manual  

E-Print Network [OSTI]

1 Capital Projects Delivery Procedures Manual September 4, 2008 Office of the CFO #12;2 Page I of the Capital Budget 11 B. Budget Approval 12 C. Setting Up Capital Projects 13 III. Procedures for Design ­ Office of the Chief Financial Officer Financial Policies and Procedures for the Capital Project Delivery

Alpay, S. Pamir

384

Waste minimization assessment procedure  

SciTech Connect (OSTI)

Perry Nuclear Power Plant began developing a waste minimization plan early in 1991. In March of 1991 the plan was documented following a similar format to that described in the EPA Waste Minimization Opportunity Assessment Manual. Initial implementation involved obtaining management's commitment to support a waste minimization effort. The primary assessment goal was to identify all hazardous waste streams and to evaluate those streams for minimization opportunities. As implementation of the plan proceeded, non-hazardous waste streams routinely generated in large volumes were also evaluated for minimization opportunities. The next step included collection of process and facility data which would be useful in helping the facility accomplish its assessment goals. This paper describes the resources that were used and which were most valuable in identifying both the hazardous and non-hazardous waste streams that existed on site. For each material identified as a waste stream, additional information regarding the materials use, manufacturer, EPA hazardous waste number and DOT hazard class was also gathered. Once waste streams were evaluated for potential source reduction, recycling, re-use, re-sale, or burning for heat recovery, with disposal as the last viable alternative.

Kellythorne, L.L. (Centerior Energy, Cleveland, OH (United States))

1993-01-01T23:59:59.000Z

385

III-1.10(A) page 1 III-1.10(A) UNIVERSITY OF MARYLAND PROCEDURES FOR SCHOLARLY  

E-Print Network [OSTI]

III-1.10(A) page 1 III-1.10(A) UNIVERSITY OF MARYLAND PROCEDURES FOR SCHOLARLY MISCONDUCT Approved. GENERAL These procedures implement the Board of Regents Policy on Misconduct in Scholarly Work (November 30, 1989). All references to the "University" in these procedures mean the University of Maryland

Shapiro, Benjamin

386

Procedures Governing Appeals of Nonrenewal Decisions (approved by the Committee on Faculty Rights and Responsibilities, May 1998)  

E-Print Network [OSTI]

Procedures Governing Appeals of Nonrenewal Decisions (approved by the Committee on Faculty Rights and procedures adopted by the Board of Regents and appear in sections UWS 3.07 and 3.08 of the Wisconsin. Sections 7.07, 7.08, 7.09 and 7.10 of the UW-Madison Faculty Policies and Procedures [FPP] implement at UW

Sheridan, Jennifer

387

Transition Implementation Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide was prepared to aid in the development, planning, and implementation of requirements and activities during the transition phase at Department of Energy (DOE) facilities that have been declared or are forecast to become excess to any future mission requirements.

2001-04-24T23:59:59.000Z

388

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

389

Records Management Exit Procedures  

Broader source: Energy.gov (indexed) [DOE]

Exit Procedures For Departing Federal and contractor Employees PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and the preservation of Federal records are required by law and regulation (contained in 36 CFR Chapter XII). As Federal and contractor employees, you have Federal record-keeping responsibilities that are regulated by the National Archives and Records Administration (NARA) to ensure the retention and

390

Plans, Implementation, and Results Glossary  

Office of Energy Efficiency and Renewable Energy (EERE)

Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

391

Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and  

Open Energy Info (EERE)

Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and Testing in Geothermal Exploration Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and Testing in Geothermal Exploration Abstract No abstract prepared. Authors Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr., Ronald D. Jacobsen and Gene Polik Organization Sandia National Laboratories Published Geothermal Technologies Legacy Collection, 1999 Report Number SAND99-1976 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling and Testing in Geothermal Exploration Citation

392

Blackout Final Implementation Report  

Broader source: Energy.gov (indexed) [DOE]

Report Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors are listed in Annex 1. The staff wish to acknowledge the contributions of the U.S. Federal Energy Regulatory Commission and the Ontario Ministry of Energy. The staff also wish to acknowl- edge the support and cooperation of the North American Electric Reliability Council and, in particular, of Mr. David Nevius, Senior Vice President and Direc- tor of Reliability Assessment & Performance

393

Implementation of Sustainability at  

E-Print Network [OSTI]

0 Assessing Implementation of Sustainability at UiO Grønt UiO S u s t a i n a b i l i t y i n R e sustainability commitment among universities and proposed Best Green University Practices in 2010. It presents the current status of UiO Environmental Sustainability. #12;1 If you cannot measure it, you cannot manage it

Johansen, Tom Henning

394

Department of Energy Technical Standards Procedures | Department...  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Technical Standards Procedures Department of Energy Technical Standards Procedures The following procedures should be used to write, revise, or maintain a DOE...

395

Federal Agency NEPA Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

396

Records Management Exit Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Exit Procedures Records Management Exit Procedures The purpose of this brochure is to provide records exit procedures for Federal and contractor employees who are departing on a...

397

Chapter 13 - Simplified Acquisition Procedures | Department of...  

Broader source: Energy.gov (indexed) [DOE]

13 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures 13.2PurchaseOrders0.pdf More Documents...

398

Ordering Procedures for Contract Audit Services | Department...  

Broader source: Energy.gov (indexed) [DOE]

Ordering Procedures for Contract Audit Services Ordering Procedures for Contract Audit Services Contract Audit Services Ordering Procedures for Contract Audit Services More...

399

Design of an Experimental Facility for the Validation of Cooling Load Calculation Procedures.  

E-Print Network [OSTI]

??Two test cells were constructed to validate the ASHRAE cooling load calculation procedures developed under RP-875 and codified in the ASHRAE Loads Toolkit (RP987). The (more)

Eldridge, David Stewart

2007-01-01T23:59:59.000Z

400

Procedures for Students seeking accommodations.  

E-Print Network [OSTI]

This document outlines the procedures to be followed by students seeking accommodations in the following mathematics courses during Fall and Spring...

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Test plan for ISV laboratory-pyrolysis testing  

SciTech Connect (OSTI)

The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

McAtee, R.E.

1991-09-01T23:59:59.000Z

402

Purchasing Policy and Procedures Page 1 Purchasing Policy and Procedures  

E-Print Network [OSTI]

Controller Responsible Offices: Purchasing Resource Services Controller's Office Origination Date: December 1Purchasing Policy and Procedures Page 1 4-1-2010 Purchasing Policy and Procedures Policy Statement are followed. Purchasing Resource Services (PRS), which is part of University Services, is the single point

Shahriar, Selim

403

Safeguards management inspection procedures  

SciTech Connect (OSTI)

The objective of this inspection module is to independently assess the contributions of licensee management to overall safeguards systems performance. The inspector accomplishes this objective by comparing the licensee's safeguards management to both the 10 CFR, parts 70 and 73, requirements and to generally accepted management practices. The vehicle by which this comparison is to be made consists of assessment questions and key issues which point the inspector to areas of primary concern to the NRC and which raise additional issues for the purpose of exposing management ineffectiveness. Further insight into management effectiveness is obtained through those assessment questions specifically directed toward the licensee's safeguards system performance. If the quality of the safeguards is poor, then the inspector should strongly suspect that management's role is ineffective and should attempt to determine management's influence (or lack thereof) on the underlying safeguards deficiencies. (The converse is not necessarily true, however.) The assessment questions in essence provide an opportunity for the inspector to identify, to single out, and to probe further, questionable management practices. Specific issues, circumstances, and concerns which point to questionable or inappropriate practices should be explicitly identified and referenced against the CFR and the assessment questions. The inspection report should also explain why the inspector feels certain management practices are poor, counter to the CFR, and/or point to ineffecive management. Concurrent with documenting the inspection results, the inspector should provide recommendations for alleviating observed management practices that are detrimental to effective safeguards. The recommendations could include: specific changes in the practices of the licensee, followup procedures on the part of NRC, and proposed license changes.

Barth, M.J.; Dunn, D.R.

1984-08-01T23:59:59.000Z

404

Quality Assurance Procedures for ModCat Database Code Files  

SciTech Connect (OSTI)

The Quality Assurance procedures used for the initial phase of the Model Catalog Project were developed to attain two objectives, referred to as basic functionality and visualization. To ensure the Monte Carlo N-Particle model input files posted into the ModCat database meet those goals, all models considered as candidates for the database are tested, revised, and re-tested.

Siciliano, Edward R.; Devanathan, Ram; Guillen, Zoe C.; Kouzes, Richard T.; Schweppe, John E.

2014-04-01T23:59:59.000Z

405

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... is chosen with limited regard to the short or long-tenn cost. This paper discusses how to develop a plan appropriate to the needs of a particular facility. Introduction In most cases, the opportunity to install a more efficient motor isO available...

Elliott, R. N.

406

Control of hazardous energy sources (lockout/tagout procedures)  

SciTech Connect (OSTI)

The Occupational Safety and Health Administration (OSHA) Standard 29 CFR 1910.147 addresses practices and procedures that are necessary to disable machinery or equipment and to prevent the release of potentially hazardous energy during maintenance operations. The standard contains definitive criteria for establishing an effective program for locking out or tagging out energy isolating devices. The standard contains major training requirements for those authorized to use the energy isolating devices and those that are affected by their use. Periodic inspections are required at least annually to ensure that the energy control procedures continue to be implemented properly.

Seidel, K.G.

1991-01-01T23:59:59.000Z

407

OHS 601 -Ionising Radiation Procedure Version 4.2. October 2012  

E-Print Network [OSTI]

2 OHS 601 - Ionising Radiation Procedure Version 4.2. October 2012 1. Purpose and Scope To protect Protection. OHS436-2006 Reliability Testing Procedure for Ionising Radiation Detectors OHS303-2006-Ionising Radiation Procedure Version 4.2. October 2012 Apparatus used for radiotherapy or planning radiotherapy must

New South Wales, University of

408

Procedure for Planning and Conducting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lift Plan Procedure Lift Plan Procedure Stanford Synchrotron Radiation Laboratory Lead Author __________________________________ Date 07/13/2005___________ David A. Ernst Mechanical Service Group Approvals: __________________ Date _____________________ Matt Padilla SSRL Safety Officer __________________ Date _____________________ Robert Hettel Accelerator System Department Head __________________ Date _____________________ Piero Pianetta Beam Line System Department Head Hoist and Rigging Panel Member _______________________________________ Date ______________________

409

Fuel Station Procedure Applicability All  

E-Print Network [OSTI]

Fuel Station Procedure Applicability All Last Revised 11/20/12 Procedure Owner Andrew Grant agrant for the purchasing and distribution of fuel for vehicles owned by Bowling Green State University (BGSU). This centralization is important to ensure compliance for BGSU employees who use the centralized fuel station and fuel

Moore, Paul A.

410

LOCKOUT/TAGOUT Policy & Procedure  

E-Print Network [OSTI]

LOCKOUT/TAGOUT Policy & Procedure Office of Environmental Health and Safety 5425 Woodward, Suite This procedure establishes the Wayne State University requirements for the lockout of energy isolating devices that employee's duties include performing service or maintenance covered under this section. Lockout

Berdichevsky, Victor

411

Proposal Title: Implementing FORMS for ROMS and HOPS for the Monterey Bay forecasting system  

E-Print Network [OSTI]

Proposal Title: Implementing FORMS for ROMS and HOPS for the Monterey Bay forecasting system will implement a feature-oriented initialization scheme for both west coast ROMS and HOPS. The large Feature oriented Initialization Procedure development (ROMS and HOPS) Initialization Sensitivity runs

Gangopadhyay, Avijit

412

Detailed Test Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Detailed Test Information Detailed Test Information EPA tests vehicles by running them through a series of driving routines, also called cycles or schedules, that specify vehicle speed for each point in time during the laboratory tests. For 2007 and earlier model year vehicles, only the city and highway schedules were used. Beginning with 2008 models, three additional tests will be used to adjust the city and highway estimates to account for higher speeds, air conditioning use, and colder temperatures. Note: EPA has established testing criteria for electric vehicles and plug-in hybrids that are slightly different than those for conventional vehicles. New Tests City Highway High Speed Air Conditioning Cold Temperature Detailed Comparison EPA Federal Test Procedure (City Schedule): Shows vehicle speed (mph) at each second of test

413

a 115-line MATLAB implementation  

E-Print Network [OSTI]

Apr 15, 2013 ... Alternating active-phase algorithm for multimaterial topology optimization problems -- a 115-line MATLAB implementation. Rouhollah Tavakoli...

Rouhollah Tavakoli

2013-04-15T23:59:59.000Z

414

Evaluation of Revised Computer-Based Procedure System Prototype  

SciTech Connect (OSTI)

The nuclear power industry is very procedure driven, i.e. almost all activities that take place at a nuclear power plant are conducted by following procedures. The paper-based procedures (PBPs) currently used by the industry do a good job at keeping the industry safe. However, these procedures are most often paired with methods and tools put in place to anticipate, prevent, and catch errors related to hands-on work. These tools are commonly called human performance tools. The drawback with the current implementation of these tools is that the task of performing one procedure becomes time and labor intensive. For example, concurrent and independent verification of procedure steps are required at times, which essentially means that at least two people have to be actively involved in the task. Even though the current use of PBPs and human performance tools are keeping the industry safe, there is room for improvement. The industry could potentially increase their efficiency and safety by replacing their existing PBPs with CBPs. If implemented correctly, the CBP system could reduce the time and focus spent on using the human performance tools. Some of the tools can be completely incorporated in the CBP system in a manner that the performer does not think about the fact that these tools are being used. Examples of these tools are procedure use and adherence, placekeeping, and peer checks. Other tools can be partly integrated in a fashion that reduce the time and labor they require, such as concurrent and independent verification. The incorporation of advanced technology, such as CBP systems, may help to manage the effects of aging systems, structures, and components. The introduction of advanced technology may also make the existing LWR fleet more attractive to the future workforce, which will be of importance when the future workforce will chose between existing fleet and the newly built nuclear power plants.

Katya Le Blanc; Johanna Oxstrand; Cheradan Fikstad

2013-01-01T23:59:59.000Z

415

Dynamic procedure for filtered gyrokinetic simulations  

SciTech Connect (OSTI)

Large eddy simulations (LES) of gyrokinetic plasma turbulence are investigated as interesting candidates to decrease the computational cost. A dynamic procedure is implemented in the gene code, allowing for dynamic optimization of the free parameters of the LES models (setting the amplitudes of dissipative terms). Employing such LES methods, one recovers the free energy and heat flux spectra obtained from highly resolved direct numerical simulations. Systematic comparisons are performed for different values of the temperature gradient and magnetic shear, parameters which are of prime importance in ion temperature gradient driven turbulence. Moreover, the degree of anisotropy of the problem, which can vary with parameters, can be adapted dynamically by the method that shows gyrokinetic large eddy simulation to be a serious candidate to reduce numerical cost of gyrokinetic solvers.

Morel, P.; Banon Navarro, A.; Albrecht-Marc, M.; Carati, D. [Statistical and Plasma Physics Laboratory, Universite Libre de Bruxelles, Bruxelles 1050 (Belgium); Merz, F.; Goerler, T.; Jenko, F. [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, D-85748 Garching (Germany)

2012-01-15T23:59:59.000Z

416

WRAP TRUPACT loading systems operational test report  

SciTech Connect (OSTI)

This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

DOSRAMOS, E.V.

1999-09-01T23:59:59.000Z

417

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network [OSTI]

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST PROCEDURE SELECTION LIST ­ HEALTHCARE IT TESTING NVLAP HEALTHCARE IT TESTING APPLICATION (2013-01-02) PAGE 1 OF 3 Instructions: Please check the method for which you are requesting accreditation. NVLAP Code Test Procedure Description 2011

418

Final Report Implementing Office of Management and Budget Information  

Broader source: Energy.gov (indexed) [DOE]

Final Report Implementing Office of Management and Budget Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (67 Fed Reg 62446) Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (67 Fed Reg 62446) This DOE guidelines sets forth policy and procedures to ensure and maximize the quality, utility, objectivity, and integrity of the information that DOE disseminates to members of the public. DOE has prepared this final report pursuant to OMB government-wide guidelines under section 515 of the Treasury and General Government Appropriations Act for Fiscal Year 2001. 67 Fed Reg 62446: Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines More Documents & Publications

419

Implementing the National Broadband  

Broader source: Energy.gov (indexed) [DOE]

Before the Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy NBP RFI: Communications Requirements COMMENTS OF BALTIMORE GAS & ELECTRIC COMPANY I. Introduction BGE is the nation's oldest and most experienced utility company. It has met the energy needs of central Maryland for nearly 200 years. Today, it serves more than 1.2 million business and residential electric customers, and approximately 650,000 gas customers in an economically diverse, 2,300-square-mile area encompassing Baltimore City and all or part of ten central Maryland counties.

420

Implementing the National Broadband  

Broader source: Energy.gov (indexed) [DOE]

DAKOTA ELECTRIC ASSOCIATION DAKOTA ELECTRIC ASSOCIATION I. Introduction a. Identification/description of our company Dakota Electric Association (DEA) is an Incorporated Cooperative Association which distributes electricity to more than 100,000 members in Dakota County and surrounding areas. DEA is the second largest electric cooperative in the state of Minnesota, and is a member cooperative of Great River Energy (GRE). II. Executive Summary DEA has deployed a fully integrated IP network to 26 substation sites. An IP based network transports data information for Supervisory Control and Data Acquisition (SCADA) and Load Management systems. A private Wide Area Network (WAN) was implemented by DEA in 2001 due to lack of comprehensive coverage by major carriers. In addition to the WAN, DEA relies on commercial services to communicate with load

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

422

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

423

Cone penetrometer acceptance test report  

SciTech Connect (OSTI)

This Acceptance Test Report (ATR) documents the results of acceptance test procedure WHC-SD-WM-ATR-151. Included in this report is a summary of the tests, the results and issues, the signature and sign- off ATP pages, and a summarized table of the specification vs. ATP section that satisfied the specification.

Boechler, G.N.

1996-09-19T23:59:59.000Z

424

Fuselage disbond inspection procedure using pulsed thermography  

Science Journals Connector (OSTI)

One use of pulsed thermography that has shown promise in aircraft inspection for some time is an inspection for disbonds in metallic structures. The FAA has funded research at Wayne State University in this area and Boeing identified a specific inspection requirement for disbonds on Boeing 747 aircraft. Laboratory and subsequent field testing monitored by the AANC has demonstrated the reliability of this type of inspection. As a result Boeing expects to approve a general fuselage disbond inspection procedure using pulsed thermography in the 2nd Quarter of 2001.

Mike Ashbaugh; Jeffrey G. Thompson

2002-01-01T23:59:59.000Z

425

Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711)  

Broader source: Energy.gov [DOE]

2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

426

Test Procedures for Building Energy Simulation Tools | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

University - Leicester, United Kingdom -- Dresden University of Technology - Dresden, Germany -- Sendai University - Sendai, Japan DOE Funding: 530,000 in FY15; 1,752,000...

427

Procedure for Performing In-Plane Membrane Conductivity Testing  

Broader source: Energy.gov [DOE]

Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

428

Tank Monitoring and Control System (TMACS) Acceptance Test Procedure  

SciTech Connect (OSTI)

This document is used to validate Revision 13.0 of the Tank Monitor and Control System (TMACS) and verify it functions as intended by design.

BARNES, D.A.

2000-12-14T23:59:59.000Z

429

Argonne Facilitation of PHEV Standard Testing Procedure (SAE...  

Broader source: Energy.gov (indexed) [DOE]

-- Blended -- E-REV 18 New Ideas for Treating Charging Data Needed a way to relate DC energy measured on vehicle to AC kWh from charger ANL's analysis of actual PHEV charge...

430

Heavy Duty Powertrain System Optimization and Emissions Test Procedure Development  

Broader source: Energy.gov [DOE]

2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

431

Standard-E hydrogen monitoring system shop acceptance test procedure  

SciTech Connect (OSTI)

The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

Schneider, T.C.

1997-10-02T23:59:59.000Z

432

Earned Value Management System (EVMS) Surveillance Standard Operating Procedure  

Broader source: Energy.gov (indexed) [DOE]

System (EVMS) System (EVMS) Surveillance Standard Operating Procedure (ESSOP) Issued by Office of Acquisition and Project Management MA-63 September 30, 2013 V2 DEPARTMENT OF ENERGY Office of Acquisition and Project Management (OAPM) EVMS SURVEILLANCE SOP (ESSOP) SEPTEMBER 30, 2013 ii Earned Value Management System (EVMS) Surveillance Standard Operating Procedure (ESSOP) OPR: MA-63 Update V2: September 30, 2013 1. PURPOSE. This EVMS Surveillance Standard Operating Procedure (ESSOP) serves as a primary reference for OAPM MA-63 when conducting EVM System-level assessments. DOE Order (O) 413.3B, the Office of Management and Budget (OMB) Circular A-11, and the Federal Acquisition Regulations (FAR) require implementation of an EVMS on DOE capital asset

433

TEPP Planning Tools and Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Planning Tools and Planning Tools and Procedures TEPP Planning Tools and Procedures TEPP "tools" have been developed to assist responders along the shipping corridors in preparing for an incident involving radiological materials/wastes. These tools provide a standardized approach to transportation emergency preparedness planning. Needs Assessment : The Needs Assessment is divided into two sections, planning and training and the flow chart follows the path of each. Even if the assessment reveals adequate planning and training, the conduct of a drill or exercise can be used to validate the assessment results. If the assessment reveals improvements areas, the model plans and procedures and training provided should be implemented. (Click here for an electronic version).

434

Inverter Procedures Guideline i DRAFT Guideline for the use of the  

E-Print Network [OSTI]

Inverter Procedures Guideline i DRAFT Guideline for the use of the Performance Test Protocol for Evaluating Inverters Used in GridConnected Photovoltaic Systems Prepared by Bill Brooks KEMAXenergy.whitaker@bewengineering.com #12;Inverter Procedures Guideline 1 DRAFT Guideline for the use of the Performance Test

435

Project W-320 Heel Jet Secondary Catch Mechanism lateral load test  

SciTech Connect (OSTI)

This test procedure establishes the requirements for performing a lateral load test of the Heel Jet Secondary Catch Mechanism (SCM). Successful performance of this test will demonstrate that the SCM is capable of performing as designed when subjected to a force applied normal to the longitudinal axis of the mechanism. This test procedure is prepared following the recommended format and content guidelines for test procedures as prescribed in WHC-IP-1026, Engineering Practice Guidelines, Appendix K, Test Plans, Specifications, Procedures and Reports.

Bellomy, J.R.

1994-09-01T23:59:59.000Z

436

NFRC Procedures for Applied Films  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Applied Films Applied Films Last update: 12/10/2013 07:29 PM NFRC now has a procedure for adding applied films to substrates in Optics5 and importing those applied film constructions into WINDOW5 to be used in a whole product calculation. The information presented below is provided to help simulators with this process. Feel free to contact us at WINDOWHelp@lbl.gov with questions or comments. NFRC Applied Film Procedure Applied Film Procedures (approved by NFRC) (PDF file) Approved Applied Film List (IGDB 33.0) (PDF file) NFRC Laminate Procedure Training Powerpoint with Examples (This Powerpoint presentation was used in the NFRC web based training sessions in December 2006 and January 2007) PowerPoint Presentation (PPT file) PowerPoint Presentation (PDF file) Help and Troubleshooting

437

A manual for implementing residual radioactive material guidelines  

SciTech Connect (OSTI)

This manual presents information for implementing US Department of Energy (DOE) guidelines for residual radioactive material at sites identified by the Formerly Utilized Sites Remedial Action Program (FUSRAP) and the Surplus Facilities Management Program (SFMP). It describes the analysis and models used to derive site-specific guidelines for allowable residual concentrations of radionuclides in soil and the design and use of the RESRAD computer code for calculating guideline values. It also describes procedures for implementing DOE policy for reducing residual radioactivity to levels that are as low as reasonably achievable. 36 refs., 16 figs, 22 tabs.

Gilbert, T.L.; Yu, C.; Yuan, Y.C.; Zielen, A.J.; Jusko, M.J.; Wallo, A. III

1989-06-01T23:59:59.000Z

438

Feature - Testing the Tesla  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testing the Tesla Testing the Tesla Tesla test Technician Geoff Amann takes the Tesla.through a driving cycle on Argonne's dynamometers. Argonne transportation engineers recently evaluated an all-electric Tesla Roadster at the Advanced Powertrain Research Facility's new two-wheel drive dynamometer laboratory. Data obtained from the Tesla will help researchers develop test procedures that provide an unbiased, consistent and practical approach to evaluating electric vehicles. "As we study these advanced vehicles, our knowledge base of the progression of vehicle electrification technology is enhanced," said chief engineer Mike Duoba. "In a rigorous, controlled manner, we are able to study many vehicle operating conditions to determine the impact on fuel consumption.

439

Safeguards First Principles Initiative at the Nevada Test Site  

SciTech Connect (OSTI)

The Material Control and Accountability (MC&A) program at the Nevada Test Site (NTS) was selected as a test bed for the Safeguards First Principles Initiative (SFPI). The implementation of the SFPI is evaluated using the system effectiveness model and the program is managed under an approved MC&A Plan. The effectiveness model consists of an evaluation of the critical elements necessary to detect, deter, and/or prevent the theft or diversion of Special Nuclear Material (SNM). The modeled results indicate that the MC&A program established under this variance is still effective, without creating unacceptable risk. Extensive performance testing is conducted through the duration of the pilot to ensure the protection system is effective and no material is at an unacceptable risk. The pilot was conducted from January 1, 2007, through May 30, 2007. This paper will discuss the following activities in association with SFPI: 1. Development of Timeline 2. Crosswalk of DOE Order and SFPI 3. Peer Review 4. Deviation 5. MC&A Plan and Procedure changes 6. Changes implemented at NTS 7. Training 8. Performance Test

Geneva Johnson

2007-07-08T23:59:59.000Z

440

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EPA speeds technology implementation  

SciTech Connect (OSTI)

Common barriers block the use of innovative remediation technologies. The Innovative Treatment Remediation Demonstration (ITRD) Program at the US Department of Energy`s (DOE`s) Sandia National Laboratories was initiated in 1993 in cooperation with the US Environmental Protection Agency`s (EPA`s) Technology Innovation Office in an attempt to reduce these barriers and accelerate the implementation of innovative remediation technologies. The innovative technologies considered for evaluation by the ITRD program lack the cost and performance information that would otherwise permit their full consideration as remedial alternatives. These technologies have often shown promise in pilot-scale applications but have limited full-scale data. Some examples in this category include: bioremediation, in situ dynamic stripping, soil washing and soil flushing, solvent and surfactant extraction and chemical treatment, in situ passive treatment, and advanced physical separation techniques. Currently, three ITRD projects are under way. ITRD sites are generally small, and most are characterized sites already scheduled for remediation. Thus, each project can be initiated quickly; additional program costs are minimized; and overall site remediation is accelerated. ITRD projects tend to target sites with typical soil and groundwater contamination problems. Contaminants at such sites include chlorinated solvents and petroleum products; pesticides, polychlorinated biphenyls (PCBs), and dioxins; heavy metals; explosives; and complex or multiconstituent contamination. The paper describes the activities at these three projects located at Pinellas, Mound Laboratory, and Fernald.

Hightower, M.M. [Sandia National Labs., Albuquerque, NM (United States). Environmental Programs Center

1996-04-01T23:59:59.000Z

442

Preparing for Project Implementation: Providing Resources for...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Project Implementation: Providing Resources for Implementation Save Energy Now LEADER Web Conference Project Implementation Seminar Series Save Energy Now LEADER Web Conference...

443

Concerted Action European Solar Storage Testing Group  

Science Journals Connector (OSTI)

The European Solar Storage Testing Group has been established by the ... to draw up recommendations for test-procedures for solar storage systems. The working group programme is discussed...

E. van Galen

1983-01-01T23:59:59.000Z

444

Graduate School of Journalism Interim Grievance Procedures  

E-Print Network [OSTI]

Graduate School of Journalism Interim Grievance Procedures Introduction The following procedures the Dean to conduct a hearing under the formal grievance procedures described in this statement. Those procedures, like the procedures of other schools, provide for a final appeal to the University Provost

Qian, Ning

445

Conduct of operations implementation plan  

SciTech Connect (OSTI)

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

446

Plutonium immobilization project development and testing quality assurance program description - February 1999  

SciTech Connect (OSTI)

Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work.

MacLean, L M; Ziemba, J

1999-02-01T23:59:59.000Z

447

6 - Enterprise Web Application Testing  

Science Journals Connector (OSTI)

A robust software testing strategy is essential for bulletproofing an enterprise application and for a quality delivery within the planned cost and quality. We have seen some testing strategies specific to scalability, availability, and performance in previous chapters. This chapter complements those testing methodologies by elaborating on testing best practices and testing methodologies that can be adopted for testing enterprise web applications. Creating a rock-solid testing strategy is a creative and multi-dimensional effort requiring intricate knowledge of the domain, technology, and scenario in which the end user operates. With the emergence of various enterprise web technologies, traditional testing methods fall short of meeting various end-user expectations. This chapter focuses on the challenges with testing in general and web testing methods in particular. The chapter then lays out the critical success factors for a sound testing strategy in enterprise application testing. It provides novel end-to-end software testing methodologies, starting from the testing estimation model, up through postproduction for enterprise web applications. The key pillars of the testing strategy proposed in this chapter are based on user-centric, complete validation, automation, proactive problem detection and prevention and performance focus (the UCAPP model). The chapter provides sample testing metrics, testing processes, for implementation of proposed testing strategy. The chapter also provides detailed insights from comprehensive analysis of successfully implemented enterprise web applications, software testing trends, and best practices implemented successfully in large-scale enterprise projects to achieve high availability in enterprise applications. The chapter provides enterprise testing principles with a special focus on enterprise web scenarios. In previous chapters, we saw the testing processes, best practices, and techniques applicable for each of the quality attributesscalability, availability, and performance. This chapter extends those concepts and covers the remaining aspects of testing such as testing principles, process, and techniques applicable to generic projects and enterprise web projects.

Shailesh Kumar Shivakumar

2015-01-01T23:59:59.000Z

448

NEPA Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Implementation Implementation NEPA Implementation Selected documents providing guidance on the implementation of NEPA. September 7, 2012 OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution This Office of Management and Budget (OMB) and Council on Environmental Quality (CEQ) joint memorandum expands and builds on the November 28, 2005, Environmental Conflict Resolution (ECR) Memorandum, directing departments and agencies to increase the appropriate and effective use of third-party assisted environmental collaboration as well as environmental conflict resolution to resolve problems and conflicts that arise in the context of environmental, public lands, or natural resources issues, including matters related to energy, transportation, and water and land management.

449

Financing Program Implementation Process Flow  

Broader source: Energy.gov [DOE]

The implementation process flow for financing with two models: a generic option for primary markets and a conceptual option for secondary markets.

450

High Burnup Dry Storage Cask Research and Development Project, Final Test Plan  

SciTech Connect (OSTI)

EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

none,

2014-02-27T23:59:59.000Z

451

Implementations and tests of Godunov-type particle hydrodynamics  

Science Journals Connector (OSTI)

......acceleration and the rate of change of the...prevents particle penetration. Furthermore...level of particle penetration. Additionally...hydrodynamic force and the rate of change of the...constant accretion rate during t collapse...show that particle penetration does not occur in......

S.-H. Cha; A. P. Whitworth

2003-03-21T23:59:59.000Z

452

Implementing and Testing Upstream Corner Balance Methods in PDT  

E-Print Network [OSTI]

&M as part of the PDT distribution, pdt2silo performs the simple but important task of converting the PDT output files to the SILO format, which VisIt, a visualization software developed at 14 Lawrence Livermore National Laboratory, is then able to convert...

Seager, Robert John

2013-10-01T23:59:59.000Z

453

An implementation and test of the NEXRAD Transverse Wind algorithm  

E-Print Network [OSTI]

by 5 km array (BOX) size was selected with 50 percent overlap. Figure 17 shows the computed wind vectors for each 5 km box. The overall wind flow pattern is much the same as shown by the 10 km arrays. The strong westerly winds in the extreme...) sizes to extremes. Figure 21 shows the result of using a 35 by 35 km box. There were 1849 data points in the box and only a single wind vector was produced. With a 50 percent overlap, there was insufficient space within the storm boundary for any...

Bensinger, Richard Bruce

2012-06-07T23:59:59.000Z

454

Energy Sector Cybersecurity Framework Implementation Guidance  

Energy Savers [EERE]

DRAFT FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of...

455

Providing Resources for Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Resources for Implementation (May 12, 2010) More Documents & Publications Creating a Climate for Successful Project Implementation Communicating Accomplishments to All...

456

Implementation Report: Energy Conservation Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to Section 141 of the to Section 141 of the Energy Policy Act of 2005 U.S. Department of Energy February 2007 Table of Contents List of Acronyms .............................................................................................................. 3 Introduction ...................................................................................................................... 4 State of New York, et al. v. Bodman; and NRDC, Inc. et al v. Bodman ............................ 5 Multi-Year Schedule and Implementation Update..................................................... 6 Multi-Year Schedule....................................................................................................... 6 Implementation Update .................................................................................................. 9

457

Implementation Report: Energy Conservation Activities  

Broader source: Energy.gov (indexed) [DOE]

to Section 141 of the to Section 141 of the Energy Policy Act of 2005 U.S. Department of Energy February 2007 Table of Contents List of Acronyms .............................................................................................................. 3 Introduction ...................................................................................................................... 4 State of New York, et al. v. Bodman; and NRDC, Inc. et al v. Bodman ............................ 5 Multi-Year Schedule and Implementation Update..................................................... 6 Multi-Year Schedule....................................................................................................... 6 Implementation Update .................................................................................................. 9

458

Biofuel and Bioenergy implementation scenarios  

E-Print Network [OSTI]

and bioenergy markets are modelled with the aim to conduct quantitative analyses on the production and costsBiofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies #12;Biofuel and Bioenergy implementation scenarios Final report of VIEWLS WP5, modelling studies By André

459

DOE Technical Standards Program: Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Department of Energy Technical Standards Procedures Department of Energy Technical Standards Procedures Office of Nuclear Safety The following procedures should be used to write, revise, or maintain a DOE technical standard. They are also used to convert a DOE technical standard to a non-government standard or to form a topical committee. Table of Contents (TSPP-00) Program Overview and Responsibilities (TSPP-01) Initiating DOE Technical Standards (TSPP-02) Use of Voluntary Consensus Standards and Interaction with Standards Development Organizations (TSPP-03) Developing DOE Technical Standard (TSPP-04) Coordination of Technical Standards (TSPP-05) - Draft In Concurrence Resolution - TSPP-06-2009 is the currently approved TSPP that addresses coordination of DOE Technical Standards. Approving and Issuing DOE Technical Standards (TSPP-06)

460

Administrative Billing Procedures (pbl/contracts)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Post-2006) Subscription Contracts IOUPublic Settlement Slice of the System Billing Procedures Firstgov Power Business Line (PBL) Administrative Billing Procedures This page has...

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

West Virginia University 1 Policies and Procedures  

E-Print Network [OSTI]

West Virginia University 1 Policies and Procedures In this Section: · Academic Integrity a Charge of Academic Dishonesty · Appeal Procedures for Cases Involving Academic Dishonesty Academic

Mohaghegh, Shahab

462

POLICY GUIDANCE MEMORANDUM #31 - Procedures for Regularizing...  

Broader source: Energy.gov (indexed) [DOE]

1 - Procedures for Regularizing Illegal Appointments POLICY GUIDANCE MEMORANDUM 31 - Procedures for Regularizing Illegal Appointments As part of the Department's ongoing effort to...

463

Postdoctoral Hiring Procedures | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hiring Procedures The Postdoctoral Office at DEP coordinates and facilitates the application, review, and hiring procedures for all postdoctoral candidates, following the...

464

Export Authorizations - Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Export Authorizations - Procedures Export Authorizations - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be...

465

Presidential Permits - Procedures | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Permits - Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with...

466

SAFETY PROCEDURE SP-24 NATIONAL HIGH MAGNETIC  

E-Print Network [OSTI]

SAFETY PROCEDURE SP-24 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-24 VISITOR AND CONTRACTOR SAFETY DIRECTOR, ENVIRONMENTAL, HEALTH, SAFETY & SECURITY Angela Sutton

Weston, Ken

467

25.07.03.M3.01 Energy Risk Management Program Page 1 of 5 STANDARD ADMINISTRATIVE PROCEDURE  

E-Print Network [OSTI]

25.07.03.M3.01 Energy Risk Management Program Page 1 of 5 STANDARD ADMINISTRATIVE PROCEDURE 25.07.03.M3.01 Energy Risk Management Program Approved July 14, 2010 Revised August 26, 2010 Next scheduled/procedures to be used in the implementation of the Texas A&M University Energy Risk Management Program (ERMP

468

Stuck-at-fault test set compaction  

E-Print Network [OSTI]

and introduces a new method for measuring the contribution of each test pattern. Both static and dynamic compaction methods were implemented and evaluated in terms of final test pattern set size and diversity of excitation. The program resulting from...

Vanfickell, Jason Michael

2013-02-22T23:59:59.000Z

469

Validation of the International Code Compliant Calculator (IC3) v3.10 Using the RESNET Verification Procedures  

E-Print Network [OSTI]

verification procedure consists of the five test suites: 1) Tier one of the HERS BESTEST; 2) IECC Code Reference Home auto-generation tests; 3) HVAC tests; 4) Duct distribution system efficiency tests; and 5) Hot water system performance tests... ........................................................................................ 11 2.5. Hot Water System Performance Tests ........................................................................................................... 13 3. CONCLUSIONS...

Kim, H.; Baltazar, J. C.; Haberl, J. S.

470

Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And  

Open Energy Info (EERE)

Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration Details Activities (27) Areas (8) Regions (0) Abstract: No abstract prepared. Author(s): Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr., Ronald D. Jacobsen, Gene Polik Published: Geothermal Technologies Legacy Collection, 1999 Document Number: Unavailable DOI: Unavailable Source: View Original Report Acoustic Logs At Newberry Caldera Area (Combs, Et Al., 1999) Acoustic Logs At Steamboat Springs Area (Combs, Et Al., 1999) Core Analysis At Fort Bliss Area (Combs, Et Al., 1999)

471

HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES, PART TWO: APPLICABILITY OF CURRENT METHODS  

SciTech Connect (OSTI)

Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no U.S. nuclear power plant has implemented CPs in its main control room. Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

Ronald L. Boring; David I. Gertman

2012-10-01T23:59:59.000Z

472

CONSIDERATIONS FOR THE TREATMENT OF COMPUTERIZED PROCEDURES IN HUMAN RELIABILITY ANALYSIS  

SciTech Connect (OSTI)

Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no US nuclear power plant has implemented CPs in its main control room. Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

Ronald L. Boring; David I. Gertman

2012-07-01T23:59:59.000Z

473

ORP Tank Farms Unreviewed Safety Question Process Implementation  

Broader source: Energy.gov (indexed) [DOE]

0 Report Number: HIAR-HORP-2011-04-18 0 Report Number: HIAR-HORP-2011-04-18 Site: Office of River Protection Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Selected Aspects of Tank Farms Unreviewed Safety Question Process Implementation Dates of Activity 02/21/2011 - 04/18/2011 Report Preparer Shivaji S. Seth Activity Description/Purpose: The purpose of the activity, which was performed by the Office of Health, Safety and Security (HSS) as part of the Department of Energy (DOE) Office of River Protection's (ORP's) nuclear safety assessment and oversight, was to review and evaluate selected aspects of the Tank Farms Operating Contractor's (TOC's) implementation of the recently revised unreviewed safety question (USQ) procedure. A major aspect of the revised implemented process (Ref. 1) was to eliminate

474

Guidelines for the preparation of emergency operating procedures. Resolution of comments on NUREG-0799  

SciTech Connect (OSTI)

The purpose of this document is to identify the elements necessary for utilities to prepare and implement a program of Emergency Operating Procedures (EOPs) for use by control room personnel to assist in mitigating the consequences of a broad range of accidents and multiple equipment failures. This document applies only to the EOPs so designated; it does not address emergency preparedness or emergency planning. It also represents the resolution of comments on NUREG-0799, Draft Criteria for Preparation of Emergency Operating Procedures.

Not Available

1982-08-01T23:59:59.000Z

475

Cooperative Education Detailed Operational Procedures  

E-Print Network [OSTI]

credits of Cooperative education for one of the required elective courses in the ME programME 3990 Cooperative Education Detailed Operational Procedures Overview Cooperative education and Aeronautical Engineering faculty. Cooperative education is not a required component of the ME program

de Doncker, Elise

476

EMISSIONS TO AIR OPERATIONAL PROCEDURE  

E-Print Network [OSTI]

EMISSIONS TO AIR OPERATIONAL PROCEDURE Swansea University Estates Services Singleton Park Swansea to Air Department: Estates and Facilities Site: All Author: Ambreen Jahangir Approved by: Mark Durdin PURPOSE: To minimise emissions and discharges to air from boilers, fume cupboards, air conditioning

Harman, Neal.A.

477

Software Synthesis Procedures Viktor Kuncak  

E-Print Network [OSTI]

Software Synthesis Procedures Viktor Kuncak LARA, I&C Swiss Federal Institute of Technology (EPFL Institute of Technology (EPFL) Lausanne, Switzerland philippe.suter@epfl.ch ABSTRACT Automated synthesis. To integrate synthesis into programming languages, software synthesis algorithms should behave in a predictable

Kuncak, Viktor

478

Signed-Rank Tests for Censored Matched Pairs  

E-Print Network [OSTI]

Z . (1967), The Theory of Rank Tests, New York: AcademicT. R. (1982), " A Class of Rank Test Procedures for Censored1983), " A Modified Wilcoxon Rank Sum Test for Paired Data,"

Dorota M. Dabrowska

2011-01-01T23:59:59.000Z

479

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Procedures for Faculty Appeal Tribunals are used in these procedures: 1. `Appellant' means a faculty member who is entitled to appeal a tenure, within the Policy, Section IV, clauses 6(a) and 6(b). II Documents Governing Appeal Procedures

Hitchcock, Adam P.

480

Past DOE Technical Standards Program Procedures  

Broader source: Energy.gov [DOE]

Review past procedures used to write, revise, or maintain a Department of Energy (DOE) technical standard.

Note: This page contains sample records for the topic "test procedures implementation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

PUBLIC INTEREST DISCLOSURE (PID) POLICY AND PROCEDURES  

E-Print Network [OSTI]

i PUBLIC INTEREST DISCLOSURE (PID) POLICY AND PROCEDURES #12;PUBLIC INTEREST DISCLOSURE POLICY AND PROCEDURES 2 Contents 1. AUTHORISATION OF PROCEDURES 3 2. INTRODUCTION 3 2.1. Statement of commitment 3 2.2. Relationship to other Bureau policies 4 2.3. Application of procedures 4 3. RESPONSIBILITIES AND OBLIGATIONS 4

Greenslade, Diana

482

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Faculty General Grievance Procedure. OBJECTIVE This Procedure is designed to provide McMaster faculty members with prompt and impartial by existing, specific review procedures. It is intended to facilitate and promote informal resolution

Haykin, Simon

483

Policies, Procedures and Guidelines Complete Policy Title  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Complete Policy Title: Procedures for University Reviews copy held by the policy owner, the written copy prevails. #12;Procedures for University Reviews of Academic Departments April 28, 2005 1 Procedures for University Reviews of Academic Departments1 I

Haykin, Simon

484

Division of Human Resources University Grievance Procedures  

E-Print Network [OSTI]

Division of Human Resources University Grievance Procedures Employee Relations/ USF System Grievance Procedure Questions: (813) 974-2970 Rev. 12/2012 This procedure applies to Administration, Staff in this procedure are expressed in calendar days. If a deadline falls on a Saturday, Sunday or holiday, an action

Meyers, Steven D.

485

CSP Policies & Procedures Process for Grade Appeals  

E-Print Network [OSTI]

CSP Policies & Procedures Process for Grade Appeals Grade Appeals ­ Generally speaking, once grades

Leistikow, Bruce N.

486

Ris-R-1263(EN) Procedures for Determination of  

E-Print Network [OSTI]

Plutonium procedure for seaweed 9 Plutonium procedure for 1-2 g sediment or soil 10 Americium procedure

487

HUD Choice Neighborhoods Implementation Grants  

Broader source: Energy.gov [DOE]

The U.S. Department of Housing and Urban Development (HUD) is accepting applications to support communities that have undergone a comprehensive local planning process and are ready to implement their "Transformation Plan" to redevelop the neighborhood.

488

Local Action Planning and Implementation  

Science Journals Connector (OSTI)

In its recently published Strategic Research Agenda the European wind energy platform, TPWind, proposes an ambitious vision ... Europe. In this vision, 300 GW of wind energy capacity will be implemented by 2030, ...

Maryke van Staden; Francesco Musco

2010-01-01T23:59:59.000Z

489

IMPLEMENTING THE STANDARD SPECTRUM METHOD FOR ANALYSIS OF ?-? COINCIDENCE SPECTRA  

SciTech Connect (OSTI)

The standard deconvolution analysis tool (SDAT) algorithms were developed and tested at the University of Texas at Austin. These algorithms utilize the standard spectrum technique for spectral analysis of {beta}-{gamma} coincidence spectra for nuclear explosion monitoring. Work has been conducted under this contract to implement these algorithms into a useable scientific software package with a graphical user interface. Improvements include the ability to read in PHD formatted data, gain matching, and data visualization. New auto-calibration algorithms were developed and implemented based on 137Cs spectra for assessment of the energy vs. channel calibrations. Details on the user tool and testing are included.

Biegalski, S.; Flory, Adam E.; Schrom, Brian T.; Ely, James H.; Haas, Derek A.; Bowyer, Ted W.; Hayes, James C.

2011-09-14T23:59:59.000Z

490

Hitching of cable drawn implements  

E-Print Network [OSTI]

systems still use the concept of moving the carrier and The journal used as pattern for format and style was Transactions of the ASAE (American Society of Agricultural Engineers). power unit with the implement. A possible method of increasing power... systems still use the concept of moving the carrier and The journal used as pattern for format and style was Transactions of the ASAE (American Society of Agricultural Engineers). power unit with the implement. A possible method of increasing power...

Harrison, Carl Randall

2012-06-07T23:59:59.000Z

491

Computer system design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)  

SciTech Connect (OSTI)

Description of the Proposed Activity/REPORTABLE OCCURRENCE or PIAB: This ECN changes the computer systems design description support document describing the computers system used to control, monitor and archive the processes and outputs associated with the Hydrogen Mitigation Test Pump installed in SY-101. There is no new activity or procedure associated with the updating of this reference document. The updating of this computer system design description maintains an agreed upon documentation program initiated within the test program and carried into operations at time of turnover to maintain configuration control as outlined by design authority practicing guidelines. There are no new credible failure modes associated with the updating of information in a support description document. The failure analysis of each change was reviewed at the time of implementation of the Systems Change Request for all the processes changed. This document simply provides a history of implementation and current system status.

Ermi, A.M.

1997-05-01T23:59:59.000Z

492

International Energy Agency design tool evaluation procedure  

SciTech Connect (OSTI)

Detailed state-of-the-art building energy simulation models from nations participating in International Energy Agency (IEA) Task VIII are used to develop a quantitative procedure to evaluate more simplified design tools. Simulations are performed with the detailed models on a series of cases that progress systematically from the extremely simple to the relatively realistic. Output values for the cases, such as annual loads, annual maximum and minimum temperatures, and peak loads, are used to set target ranges with which the results from more simplified design tools can be compared. The more realistic cases, although geometrically simple, test the ability of the design tools to model such combined effects as thermal mass, direct gain windows, overhangs, internally generated heat, and dead-band and set-back thermostat control strategies. 5 refs., 9 figs., 4 tabs.

Judkoff, R.; Barakat, S.; Bloomfield, D.; Poel, B.; Stricker, R.; van Haaster, P.; Wortman, D.

1988-07-01T23:59:59.000Z

493

Preamble - National Environmental Policy Act Implementing Procedures (61 FR 64603, December 6, 1996)  

Broader source: Energy.gov (indexed) [DOE]

03 03 Federal Register / Vol. 61, No. 236 / Friday, December 6, 1996 / Rules and Regulations ending October 15, 1996. Two comments were received. The Board commented that it supports the rule, in part, but it requested that the Department reconsider allowing the application of interest and late payment charges on assessments delinquent prior to the effective date of the final rule. The Board commented that the proposed rule ignored the industry's recommendations with regard to assessments which are delinquent prior to the effective date of the final rule and no one should be allowed to benefit from a ''free ride'' at the expense of other handlers. The Board believes that allowing handlers a short period of notice, such as 60 days, before imposing interest and late payment charges after

494

Technical background document for the Great Lakes water quality guidance implementation procedures compliance cost study  

SciTech Connect (OSTI)

The document presents the detailed results of the evaluations performed to estimate the compliance costs related to the proposed Great Lakes Water Quality Guidance. Specifically, the document provides the results of the individual evaluations performed on the 59 sample facilities selected to represent the direct discharges to the Great Lakes System.

Parikh, P.; Fenner, K.; Podar, M.; Snyder, B.

1993-04-16T23:59:59.000Z

495

Code of Federal Regulations Procedural Rules for DOE Nuclear Activities Part II  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is issuing procedural rules to be used in applying its substantive regulations and orders relating to nuclear safety. These procedural rules are intended to be an essential part of the framework through which DOE deals with its contractors, subcontractors, and suppliers to ensure its nuclear facilities are operated in a manner that protects public and worker safety and the environment. In particular, this part sets forth the procedures to implement the provisions of the Price- Anderson Amendments Act of 1988 (PAAA) which subjects DOE contractors to potential civil and criminal penalties for violations of DOE rules, regulations and orders relating to nuclear safety (DOE Nuclear Safety Requirements).

496

Implementing New Methods of Laser Marking of Items in the Nuclear Material Control and Accountability System at SSC RF-IPPE: An Automated Laser Marking System  

SciTech Connect (OSTI)

For over ten years SSC RF-IPPE, together with the US DOE National Laboratories, has been working on implementing automated control and accountability methods for nuclear materials and other items. Initial efforts to use adhesive bar codes or ones printed (painted) onto metal revealed that these methods were inconvenient and lacked durability under operational conditions. For NM disk applications in critical stands, there is the additional requirement that labels not affect the neutron characteristics of the critical assembly. This is particularly true for the many stainless-steel clad disks containing highly enriched uranium (HEU) and plutonium that are used at SSC RF-IPPE for modeling nuclear power reactors. In search of an alternate method for labeling these disks, we tested several technological options, including laser marking and two-dimensional codes. As a result, the method of laser coloring was chosen in combination with Data Matrix ECC200 symbology. To implement laser marking procedures for the HEU disks and meet all the nuclear material (NM) handling standards and rules, IPPE staff, with U.S. technical and financial support, implemented an automated laser marking system; there are also specially developed procedures for NM movements during laser marking. For the laser marking station, a Zenith 10F system by Telesis Technologies (10 watt Ytterbium Fiber Laser and Merlin software) is used. The presentation includes a flowchart for the automated system and a list of specially developed procedures with comments. Among other things, approaches are discussed for human-factor considerations. To date, markings have been applied to numerous steel-clad HEU disks, and the work continues. In the future this method is expected to be applied to other MC&A items.

Regoushevsky, V I; Tambovtsev, S D; Dvukhsherstnov, V G; Efimenko, V F; Ilyantsev, A I; Russ III, G P

2009-05-18T23:59:59.000Z

497

Microsoft Word - Appendix C - Soil Disturbance Evaluation Procedure.docx  

Office of Legacy Management (LM)

Rocky Flats Site Soil Disturbance Evaluation Procedure Rocky Flats Site Soil Disturbance Evaluation Procedure This page intentionally left blank U.S. Department of Energy Rocky Flats Site Operations Guide July 2013 Doc. No. S03037-6.0 Page C-1 Soil Disturbance Evaluation Process Purpose: The purpose of this Soil Disturbance Evaluation Process is to identify hazards and regulatory requirements so that appropriate work control steps, including regulatory agency and/or engineering approvals, are implemented to address and mitigate the hazard and/or meet regulatory requirements. The soil disturbance evaluation process is a part of the Rocky Flats Site Operations Guide (RFSOG) work planning process (Section 12.1), including consideration of the Health and Safety Manual, LMS/POL/S04321 standard for penetration permits. This

498

Office of Departmental Personnel Security - Policy and Procedures  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy and Procedures Policy and Procedures Office of Departmental Personnel Security DOE Directives Clearance Access Matrix Executive Order 13467-Reforming Intelligence Reform and Terroroism Prevention Act of 2004 Extension of DOE N 470.5, Bond Renewal Final Notice Would Counseling/Treatment Cost Me My Security Clearance? 2005 Adjudicative Guidelines Implementation Executive Order 12968 10 CFR 710 Reciprocity Checklist * *This Checklist is provided pursuant to Appendix B of DOE O 472.2, Personnel Security, and must be utilized in accordance with the contents of that directive. This Checklist was issued by the Office of Management and Budget for use nationally across the Federal Government. Department of Energy Administrative Records Schedule 18: Security, Emergency Planning, and Safety Records, September 2010, Revision 2 (Personnel Security Records start on Page 17)

499

CBFWA Wildlife Habitat Evaluation Procedures (HEP)CBFWA Wildlife Habitat Evaluation Procedures (HEP) (2006(2006--006006--00)00)  

E-Print Network [OSTI]

CBFWA Wildlife Habitat Evaluation Procedures (HEP)CBFWA Wildlife Habitat Evaluation Procedures (HEP 101HEP 101 Habitat Evaluation Procedures (HEP) developed byHabitat Evaluation Procedures (HEP

500

Self-assessment program implementation plan. Revision A  

SciTech Connect (OSTI)

This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

Quets, A.L.

1991-10-23T23:59:59.000Z