National Library of Energy BETA

Sample records for test procedure summary

  1. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  2. Energy Conservation Program: Test Procedures for Certain Categories...

    Broader source: Energy.gov (indexed) [DOE]

    EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for ... SUMMARY: The U.S. Department of Energy (DOE) proposes to establish test procedures for ...

  3. Sandia Satellite Program summary of operational procedures

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Operational procedures for the Space Systems Department and Space Sensors Department are described. Departmental policies and procedures from design of systems for space applications through qualification for spaceflight are summarized. 1 fig.

  4. Energy Conservation Program: Test Procedures for External Power...

    Broader source: Energy.gov (indexed) [DOE]

    EERE-2014-BT-TP-0043 RIN: 1904-AD36 Energy Conservation Program: Test Procedures for ... SUMMARY: On October 9, 2014, the U.S. Department of Energy proposed to revise its test ...

  5. Alternative Neutron Detection Testing Summary

    SciTech Connect (OSTI)

    Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Kernan, Warnick J.; Lintereur, Azaree T.; Siciliano, Edward R.; Stromswold, David C.; Woodring, Mitchell L.

    2010-04-08

    Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. Most currently deployed radiation portal monitors (RPMs) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large area neutron detector. This type of neutron detector is used in the TSA and other RPMs installed in international locations and in the Ludlum and Science Applications International Corporation RPMs deployed primarily for domestic applications. There is a declining supply of 3He in the world and, thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. These technologies are: 1) Boron trifluoride-filled proportional counters, 2) Boron-lined proportional counters, 3) Lithium-loaded glass fibers, and 4) Coated wavelength-shifting plastic fibers. Reported here is a summary of the testing carried out at Pacific Northwest National Laboratory on these technologies to date, as well as measurements on 3He tubes at various pressures. Details on these measurements are available in the referenced reports. Sponsors of these tests include the Department of Energy (DOE), Department of Homeland Security (DHS), and the Department of Defense (DoD), as well as internal Pacific Northwest National Laboratory funds.

  6. Cathodic protection acceptance test procedure

    SciTech Connect (OSTI)

    Nordquist, E.M.

    1994-09-02

    This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

  7. ENERGY STAR Appliance Verification Testing - Pilot Program Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated ...

  8. Standards and Test Procedures | Department of Energy

    Energy Savers [EERE]

    Appliance & Equipment Standards Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain ...

  9. Specifications and Test Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  10. Nevada Test Site Environmental Report 2007 Summary

    SciTech Connect (OSTI)

    Cathy Wills

    2008-09-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2007 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and offsite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

  11. Nevada Test Site Summary 2006 (Volume 2)

    SciTech Connect (OSTI)

    Cathy Wills

    2007-10-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security-related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2006 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and its satellite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

  12. Nevada Test Site Environmental Summary Report 2006

    SciTech Connect (OSTI)

    Cathy Wills

    2007-10-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2006 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and its satellite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

  13. Meeting Concerning Potential Test Procedures and Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards for Set-Top Boxes and Network Equipment | Department of Energy Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment In compliance with the Department of Energy's guidance on ex parte communications (74 Fed. Reg. 52795 (Oct. 14, 2009)), this memorandum provides a summary of a March 7, 2012, meeting with DOE

  14. Current Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This

  15. TMACS Test Procedure TP007: System administration

    SciTech Connect (OSTI)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  16. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  17. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  18. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  19. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  20. TMACS Test Procedure TP011: Panalarm Interface

    SciTech Connect (OSTI)

    Seghers, R.; Washburn, S.J.

    1994-05-24

    The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions.

  1. Summary of Test Results for Daya Bay Rock Samples (Technical...

    Office of Scientific and Technical Information (OSTI)

    Summary of Test Results for Daya Bay Rock Samples Citation Details In-Document Search Title: Summary of Test Results for Daya Bay Rock Samples You are accessing a document from ...

  2. Summary of Test Results for Daya Bay Rock Samples (Technical...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Summary of Test Results for Daya Bay Rock Samples Citation Details In-Document Search Title: Summary of Test Results for Daya Bay Rock Samples A series of ...

  3. Nevada Test Site Environmental Report Summary 2009

    SciTech Connect (OSTI)

    Cathy Wills, ed.

    2010-09-13

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). NNSA/NSO prepares the Nevada Test Site Environmental Report (NTSER) to provide the public an understanding of the environmental monitoring and compliance activities that are conducted on the NTS to protect the public and the environment from radiation hazards and from nonradiological impacts. The NTSER is a comprehensive report of environmental activities performed at the NTS and offsite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. This summary provides an abbreviated and more readable version of the NTSER. It does not contain detailed descriptions or presentations of monitoring designs, data collection methods, data tables, the NTS environment, or all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

  4. In-place filter testing summary

    SciTech Connect (OSTI)

    Ortiz, J.P.; Garcia, E.D.; Ortega, J.M.

    1988-03-01

    The most common method of identifying particle penetration through a filter or adsorber system is through the performance of a periodic penetration test, i.e., in-place test or leak test using an aerosol or gas vapor to challenge the filter or adsorber system. The aerosol is usually formed by vaporization of a liquid, di-2(ethelhexyl sebacate) (DEHS), and allowed to condense to form liquid particles of a certain size and distribution. The gas vapor is formed by vaporization of Freon 11 liquid. The periodic penetration test, although conducted annually, can and has been demonstrated to show the beginning degradation of a filter or adsorber system. Other evidence of penetration can include detection of radiation downstream of the filter system or the existence of an unusually low pressure drop across the filter, i.e., torn filter, etc. However, these kinds of occurrences show up instantaneously and could release radioactive material to the atmosphere before the systems could be shut down. When a filter system fails the in--place test or is showing evidence of.filter or component degradation, corrective measures are put into place in order to return,the system back to its best operating condition. This report presents a summary of all filter tests.

  5. Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with

  6. Test report - caustic addition system operability test procedure

    SciTech Connect (OSTI)

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  7. In-place testing summary - 1990

    SciTech Connect (OSTI)

    Ortiz, J.P.

    1990-05-01

    This is one of several reports concerning an on-going in-place testing program of high efficiency filtration and chemical adsorber systems and portable filtered exhausters at the Los Alamos National Laboratory. This testing is in support of the Laboratory`s airborne waste management programs and asbestos abatement programs. Periodic in-place testing, along with health physics air sampling will determine whether the air cleaning systems are maintaining acceptable air-cleaning levels. These periodic evaluations help ensure that the plant and surrounding environment are free of any significant radioactive particulates, based on current EPA environmental levels and chemical airborne hazards from processing effluents. This report will provide an overview of system performance, testing methods and procedures.

  8. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) ...

  9. DACS upgrade acceptance test procedure

    SciTech Connect (OSTI)

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  10. 2008 Annual Merit Review Results Summary - 3. Battery Development, Testing,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Simulation, Analysis | Department of Energy 3. Battery Development, Testing, Simulation, Analysis 2008 Annual Merit Review Results Summary - 3. Battery Development, Testing, Simulation, Analysis DOE Vehicle Technologies Annual Merit Review 2008_merit_review_3.pdf (1.21 MB) More Documents & Publications 2008 Annual Merit Review Results Summary - 5. Advanced Power Electronics 2008 Annual Merit Review Results Summary - 14. Vehicle Systems and Simulation 2008 Annual Merit Review Results

  11. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  12. DOE Launches Public Test Procedure Guidance Website

    Broader source: Energy.gov [DOE]

    The Department of Energy this week launched a new online database offering guidance on the Department’s test procedures for appliances and commercial equipment.  The new database will provide a...

  13. Nevada Test Site FFCA Consent Order, March 27, 1996 Summary

    Office of Environmental Management (EM)

    Test Site Federal Facility Compliance Act Consent Order, March 27, 1996 State Nevada Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Enforce the STP and establish ...

  14. Test Procedure Development and Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how

  15. Test Procedures for Integrated Light-Emitting Diode Lamps; Final...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedures for Integrated Light-Emitting Diode Lamps - Final Rule (532.58 KB) More Documents & Publications ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures ...

  16. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

    Office of Environmental Management (EM)

    6 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; ...

  17. AVTA: Urban Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 ...

  18. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled...

    Energy Savers [EERE]

    Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated ...

  19. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedures for Dehumidifiers, Final Rule. dehumidtpfinalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures ...

  20. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; ...

  1. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 ...

  2. 2014-10-16 Issuance: Energy Conservation Program Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential ...

  3. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ...

  4. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Office of Environmental Management (EM)

    0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document ...

  5. ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice ... ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air ...

  6. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation ...

  7. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure...

    Office of Environmental Management (EM)

    Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for ...

  8. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, ...

  9. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures ...

  10. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    the Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned ... More Documents & Publications 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled ...

  11. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External ...

  12. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial ...

  13. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice...

    Broader source: Energy.gov (indexed) [DOE]

    ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories ... Service Lamps, Notice of Proposed Rulemaking Test Procedure for Compact Fluorescent Lamps:

  14. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, Notice ...

  15. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Conservation Program: Test Procedures for Certain Categories of General Service ... Lamps, Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; ...

  16. 2014-04-11 Issuance: Test Procedures for Residential Clothes...

    Office of Environmental Management (EM)

    1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed ...

  17. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures ...

  18. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for Manufactured ...

  19. Ex Parte Communication on Central Air-Conditioner Test Procedure...

    Office of Environmental Management (EM)

    Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues On October ... Energy (DOE) to discuss proposed amended test procedures for central air conditioners ...

  20. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final ...

  1. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ... Program for Consumer Products: Test Procedure for Ceiling Fans;NOPR 2014-09-16 ...

  2. Energy Conservation Program: Test Procedure for Pumps, Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation ...

  3. DOE Publishes Final Rule for Television Test Procedure | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  4. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  5. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for ...

  6. ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12-18: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Final Rule ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures for ...

  7. ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Energy Conservation Program: Test Procedures for External Power Supplies, Final Rule ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures for External Power Supplies, ...

  8. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for ...

  9. Nevada Test Site Environmental Report 2008 Summary

    SciTech Connect (OSTI)

    Cathy A. Wills

    2009-09-01

    The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.

  10. Tonopah Test Range 2030 Meeting Summary Report

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2009-04-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Closed, Closed in Place, or Closure in Progress. CASs and CAUs where contaminants were either not detected or were cleaned up to within regulatory action levels are summarized. CASs and CAUs where contaminants and/or waste have been closed in place are summarized. There is also a table that summarizes the contaminant that has been closed at each site, if land-use restrictions are present, and if post-closure inspections are required.

  11. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect (OSTI)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  12. ENERGY STAR Appliance Verification Testing- Pilot Program Summary Report dated February 3, 2012

    Broader source: Energy.gov [DOE]

    This document is ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012

  13. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the

  14. Microsoft Word - CFN_Summary_PCR_Test-Facility.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SUMMARY Call for Nominations IO/16/CFT/13145/JTR Contract for The provision of a Test Facility for the Full Size Pre-Compression Rings Page 2 of 11 Table of Contents 1 PURPOSE AND BACKGROUND ............................................................................................................... 3 2 SCOPE OF THE CONTRACT ..................................................................................................................... 3 3 PROCUREMENT STRATEGY

  15. TMACS Test Procedure TP008: SACS Interface. Revision 5

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions.

  16. TMACS test procedure TP009: Acromag driver. Revision 5

    SciTech Connect (OSTI)

    Bass, R.B.; Washburn, S.J.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system.

  17. Summary description of the Fast Flux Test Facility

    SciTech Connect (OSTI)

    Cabell, C.P.

    1980-12-01

    This document has been compiled and issued to provide an illustrated engineering summary description of the FFTF. The document is limited to a description of the plant and its functions, and does not cover the extensive associated programs that have been carried out in the fields of design, design analysis, safety analysis, fuels development, equipment development and testing, quality assurance, equipment fabrication, plant construction, acceptance testing, operations planning and training, and the like.

  18. Laboratory procedures for waste form testing

    SciTech Connect (OSTI)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  19. Summary of Granulation Matrix Testing for the Plutonium Immobilization Program

    SciTech Connect (OSTI)

    Herman, C.C.

    2001-10-19

    In FY00, a matrix for process development testing was created to identify those items related to the ceramic process that had not been fully developed or tested and to help identify variables that needed to be tested. This matrix, NMTP/IP-99-003, was jointly created between LLNL and SRTC and was issued to all affected individuals. The matrix was also used to gauge the progress of the development activities. As part of this matrix, several series of tests were identified for the granulation process. This summary provides the data and results from the granulation testing. The results of the granulation matrix testing were used to identify the baseline process for testing in the PuCTF with cold surrogates in B241 at LLNL.

  20. Energy Conservation Program: Final Rule; Test Procedures for...

    Office of Environmental Management (EM)

    Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP FinalRule (601.19 KB) More Documents & ...

  1. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

  2. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for ...

  3. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...

    Energy Savers [EERE]

    Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test ...

  4. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy Conservation Program: Test ...

  5. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy (DOE) has published a final rule regarding test procedures for ... EERE-2010-BT-TP-0010. Find product information about current standards and test ...

  6. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (334.01 KB) ETA-NTP004 Electric Vehicle Constant Speed Range Test (138.66 KB) ETA-NTP005 Electric Vehicle Rough Road

  7. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  8. TMACS test procedure TP001: Alarm management. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

  9. TMACS test procedure TP004: Reporting. Revision 4

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addressed the report generation capability of the TMACS. The features to be tested are generation of the alarm history report, equipment failure report, single-shell tank report and double-shell tank report.

  10. TMACS test procedure TP003: Graphics. Revision 5

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  11. Ex Parte Communication on Central Air-Conditioner Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Procedure Ex Parte Communication on Central Air-Conditioner Test Procedure On September 18, 2015, AHRI staff and Manufacturing Representatives met with representatives from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners. AHRI Ex Parte Memo CACTP (39.48 KB) More Documents & Publications Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues Ex Parte Memo on CAC/Dry Charged Units

  12. Report Summary: Hammer Testing Findings for Solid-State Lighting Luminaires

    SciTech Connect (OSTI)

    2014-01-01

    Brief summary of DOE LED Systems Reliability Consortium's Hammer Testing Findings for Solid-State Lighting Luminaires report.

  13. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures EV America Test Specifications (97.12 KB) ETA-TP001 Implementation of SAE Standard J1263, February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (55.05 KB) ETA-TP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (81.38 KB)

  14. Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure CEE and DOE staff discussed the importance of relying on the DOE test method as the sole metric for efficiency and energy use reporting. CEE_Notes_ClothesDryerTestProcedure_25Apr2016 (352.34 KB) More Documents & Publications 2015-03-23 Issuance: Energy Conservation Standards for Residential Clothes Dryers; Request for

  15. Light duty utility arm equipment qualification test procedure

    SciTech Connect (OSTI)

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  16. AVTA: Urban Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 Implementation of SAE Standard J1263, Feb. 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (50.53 KB) ETA-UTP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (65.68 KB) ETA-UTP003

  17. ENERGY STAR Test Procedures and Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » ENERGY STAR » ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and revision of all test procedures for products in the ENERGY STAR® program, including those products that are also subject to DOE's Energy Conservation Standards program. As specifications are updated and new products or metrics are added to the ENERGY STAR program, DOE is

  18. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment; Final Rule | Department of Energy 0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document is a pre-publication Federal Register final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014. Though it is not intended or expected, should any discrepancy occur

  19. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Products; Notice of Proposed Rulemaking | Department of Energy 6 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for miscellaneous refrigeration products, as issued by the Deputy Assistant Secretary for Energy Efficiency on

  20. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rulemaking | Department of Energy TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking GSL TP SNOPR.pdf (309.44 KB) More Documents & Publications ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking ISSUANCE 2016-02-12: Energy Conservation Program: Energy Conservation Standards

  1. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans. 79 FR 500 (January 3, 2014). Find more information on the rulemaking, including milestones, statutory authority, rulemaking documents, and any other related rulemakings. All notices, public

  2. TMACS test procedure TP012: Panalarm software bridge

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-25

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date.

  3. 2014-10-14 Issuance: Test Procedures and Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy...

  4. DOE Publishes Final Rule for Plumbing Products Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a final rule regarding test procedures for showerheads, faucets, water closets, urinals, and commercial prerinse spray valves.

  5. AVTA: Oil Bypass Filter Specifications and Test Procedures | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Oil Bypass Filter Specifications and Test Procedures AVTA: Oil Bypass Filter Specifications and Test Procedures PuraDYN Oil Bypass Filtration System Evaluation Test Plan methodology is used in the testing of all oil bypass filters on the buses at the Idaho National Laboratory. PuraDYN Oil Bypass Filtration System Evaluation Test Plan (732.1 KB) More Documents & Publications Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles Effects of

  6. Procedure for Performing In-Plane Membrane Conductivity Testing |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy In-Plane Membrane Conductivity Testing Procedure for Performing In-Plane Membrane Conductivity Testing Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia htmwg_may09_conductivity_testing.pdf (1.01 MB) More Documents & Publications In-Plane Conductivity Testing Procedures and Results High Temperature Membrane Working Group Minutes In Plane Conductivity Testing, BekkTech LLC

  7. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) HEVAmerica Technical Specifications (164.3 KB) HEV Baseline Test Sequence (46.65 KB) HEV End of Life Test Sequence (29.89 KB) ETA-HTP01 Implementation of SAE Standard J1263 February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (118.71 KB) ETA-HTP02 Implementation

  8. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  9. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    EV America Test Specifications (97.12 KB) ETA-TP001 Implementation of SAE Standard J1263, ... Gradeability, and Deceleration Test Procedure (81.38 KB) ETA-HP003 ...

  10. ETA-FEP 001 - Fleet Test and Evaluation Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEP 001 Revision 0 Effective June 30, 2004 Fleet Test And Evaluation Procedure Prepared by ... 3 4.6 Vehicle Fueling Infrastructure 3 4.7 Test Objectives 4 5. Data Collection 4 5.1 ...

  11. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect (OSTI)

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  12. Rocky Flats ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Winstead, M.L.

    1995-09-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

  13. AVTA: Transit Vehicle Specifications and Test Procedures | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Transit Vehicle Specifications and Test Procedures AVTA: Transit Vehicle Specifications and Test Procedures All Advanced Vehicle Testing Activity transit projects follow a rigorous data collection and analysis protocol. Refer to "General Evaluation Plan: Fleet Test and Evaluation Projects" for information about fleet selection, data collection, and products related to new evaluation projects. More Documents & Publications Vehicle Technologies Office: 2010 Vehicle and

  14. Test Procedures for Building Energy Simulation Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Building Energy Simulation Tools Test Procedures for Building Energy Simulation Tools Lead Performer: -- National Renewable Energy Laboratory - Golden, CO -- J. Neymark & Associates - Golden, CO -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Partners: -- ASHRAE Standing Special Projects Committee 140 -- Residential Energy Services Network (RESNET) -- International Energy Agency (IEA) - Paris, France -- Trane Inc. - Piscataway, NJ -- Carrier Corp. -

  15. Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP Final_Rule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards

  16. Rocky Flats Ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Funston, G.A.

    1995-06-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

  17. Test Procedure for UV Weathering Resistance of Backsheet | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Test Procedure for UV Weathering Resistance of Backsheet Test Procedure for UV Weathering Resistance of Backsheet Presented at the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado pvmrw13_ps5_toray_hirota.pdf (507.97 KB) More Documents & Publications QA TG5 UV, temperature and humidity Weathering Performance of PV Backsheets A Comparison of Key PV Backsheet and Module Properties from Fielded Module Exposures and Accelerated Test Conditions

  18. Nevada Test Site FFCA Consent Order, May 10, 1996 Summary

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order (FFACO) State Nevada Agreement Type Federal Facility Agreement and Consent Order Legal Driver(s) FFCAct Scope Summary Identify sites of ...

  19. Summary of Results: Round 9 of CALiPER Product Testing

    SciTech Connect (OSTI)

    None

    2009-10-01

    The Round 9 Summary Report from the U.S. Department of Energy's Solid-State Lighting CALiPER Testing Program.

  20. Webinar: Test Procedure for Battery Chargers; Notice of Data Availability

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774  (May 15, 2014). For more information, please visit...

  1. Energy Conservation Program: Test Procedures for Certain Categories...

    Broader source: Energy.gov (indexed) [DOE]

    1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 Docket No. EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for Certain Categories of ...

  2. DOE Seeks Comment on Application of Clothes Washer Test Procedure

    Broader source: Energy.gov [DOE]

    Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer...

  3. Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

  4. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination (Energy Conservation Standard) for Set-Top Boxes | Department of Energy Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes December 23, 2013 - 12:00am Addthis The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice

  5. Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    [ 6450-01-P ] DEPARTMENT OF ENERGY Notice of Intent to Prepare an Environmental Impact Statement for Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana AGENCY: Department of Energy ACTION: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Proposed Floodplain and Wetlands Involvement SUMMARY: The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy

  6. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  7. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  8. Procedure for Performing PEM Single Cell Testing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PEM Single Cell Testing Procedure for Performing PEM Single Cell Testing Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia htmwg_may09_pem_single_cell_testing.pdf (1.45 MB) More Documents & Publications FSEC's MEA Test Protocol MEA Fabrication Lead Research and Development Activity for High Temperature, Low Relative Humidity Membrane Program

  9. Flammable gas interlock spoolpiece flow response test plan and procedure

    SciTech Connect (OSTI)

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  10. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  11. AVTA: Airport Ground Support Equipment Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Airport Ground Support Equipment Specifications and Test Procedures AVTA: Airport Ground Support Equipment Specifications and Test Procedures eGSE America Electric Baggage Tow Tractor (EBTT) Technical Specifications (136.16 KB) eGSE America Electric Aircraft PushBack Tractor (EAPT) Technical Specifications (85.7 KB) eGSE America Electric Aircraft Cargo Conveyor (EACC) Technical Specifications (76.64 KB) ETA-GAC001 Control, Close-out, and Storage of Documentation (76.84

  12. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect (OSTI)

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  13. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of ...

  14. 100 Area soil washing bench-scale test procedures

    SciTech Connect (OSTI)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

  15. DOE Releases Data Summary Report for Groundwater and Soil Tests Conducted

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at the Riverton UMTRCA Site | Department of Energy Data Summary Report for Groundwater and Soil Tests Conducted at the Riverton UMTRCA Site DOE Releases Data Summary Report for Groundwater and Soil Tests Conducted at the Riverton UMTRCA Site February 19, 2013 - 12:53pm Addthis Contractor, Judy Miller, S.M. Stoller Corporation Public Affairs, (970) 248-6363, jmiller@lm.doe.gov GRAND JUNCTION, Colo. - The U.S. Department of Energy today announced the availability of a Data Summary Report of

  16. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a ...

  17. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners...

    Broader source: Energy.gov (indexed) [DOE]

    ISSUANCE 2016-04-26: Energy Conservation Program: Test Procedures for Portable Air Conditioners, Final Rule ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for ...

  18. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...

    Energy Savers [EERE]

    Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental ...

  19. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting...

    Broader source: Energy.gov (indexed) [DOE]

    notice of proposed rulemaking regarding test procedures for integrated light-emitting ... to this document. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting ...

  20. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting ...

  1. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect (OSTI)

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  2. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  3. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  4. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  5. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect (OSTI)

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  6. trona test report summary 1-17-06 .doc

    Broader source: Energy.gov (indexed) [DOE]

    Temporary test instrumentation was set up to measure SO 2 concentration before and after ... A total of 32 test runs are described in this report covering various unit loads, using ...

  7. Summary of Compression Testing of U-10Mo

    SciTech Connect (OSTI)

    Nyberg, Eric A.; Joshi, Vineet V.; Lavender, Curt A.; Burkes, Douglas

    2012-10-31

    The mechanical properties of depleted uranium plus 10 weight percent molybdenum alloy have been evaluated by high temperature compression testing.

  8. CALiPER Special Summary Report: Retail Replacement Lamp Testing

    SciTech Connect (OSTI)

    2011-04-01

    CALiPER testing has evaluated many products for commercial lighting markets and found some excellent performers. However, many of these are not available on the retail market. This special testing was undertaken to identify and test solid-state lighting (SSL) replacement lamp products that are available to the general public through retail stores and websites.

  9. ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) ABB SCADA/EMS System INEEL Baseline Summary Test Report (November 2004) This document covers the security evaluation of the "baseline" or "as delivered" system performed in the Idaho National Engineering and Environmental Laboratory (INEEL) SCADA test bed as part of the Critical Infrastructure Test Range Development Program, which is funded by the U.S. Department of Energy; Office of

  10. Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

  11. 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Consumer Furnaces and Boilers

  12. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    SciTech Connect (OSTI)

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

  13. Tonopah Test Range Summary of Corrective Action Units

    SciTech Connect (OSTI)

    Ronald B. Jackson

    2007-05-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Clean Closure/No Further Action, Closure in Place, or Closure in Progress.

  14. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Test Procedure for Pumps Final Rule 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator Energy Conservation Program: Energy Conservation Standards for Pump, Notice of Proposed Rulemaking

  15. Summary - Disposal Practices at the Nevada Test Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Area 5 LLRW & MLLW Disposal ETR Report Date: July 2008 ETR-14 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Disposal Practices at the Nevada Test Site Why DOE-EM Did This Review Radioactively contaminated materials from the Nevada Test Site (NTS), other DOE facilities and other federal agencies are disposed of at NTS at two low-level radioactive waste (LLRW) management sites: Areas 3 and 5. Disposal operations at Area 3 have been

  16. Integrated Disposal Facility FY 2012 Glass Testing Summary Report

    SciTech Connect (OSTI)

    Pierce, Eric M.; Kerisit, Sebastien N.; Krogstad, Eirik J.; Burton, Sarah D.; Bjornstad, Bruce N.; Freedman, Vicky L.; Cantrell, Kirk J.; Snyder, Michelle MV; Crum, Jarrod V.; Westsik, Joseph H.

    2013-03-29

    PNNL is conducting work to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility for Hanford immobilized low-activity waste (ILAW). Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program, PNNL is implementing a strategy, consisting of experimentation and modeling, to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. Key activities in FY12 include upgrading the STOMP/eSTOMP codes to do near-field modeling, geochemical modeling of PCT tests to determine the reaction network to be used in the STOMP codes, conducting PUF tests on selected glasses to simulate and accelerate glass weathering, developing a Monte Carlo simulation tool to predict the characteristics of the weathered glass reaction layer as a function of glass composition, and characterizing glasses and soil samples exhumed from an 8-year lysimeter test. The purpose of this report is to summarize the progress made in fiscal year (FY) 2012 and the first quarter of FY 2013 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of LAW glasses.

  17. Summary of the Solar Two Test and Evaluation Program

    SciTech Connect (OSTI)

    PACHECO,JAMES E.; REILLY,HUGH E.; KOLB,GREGORY J.; TYNER,CRAIG E.

    2000-02-08

    Solar Two was a collaborative, cost-shared project between eleven US industry and utility partners and the U. S. Department of Energy to validate molten-salt power tower technology. The Solar Two plant, located east of Barstow, CA, was comprised of 1926 heliostats, a receiver, a thermal storage system and a steam generation system. Molten nitrate salt was used as the heat transfer fluid and storage media. The steam generator powered a 10 MWe, conventional Rankine cycle turbine. Solar Two operated from June 1996 to April 1999. The major objective of the test and evaluation phase of the project was to validate the technical characteristics of a molten salt power tower. This paper describes the significant results from the test and evaluation activities.

  18. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-29

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes.

  19. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for ...

  20. Milestone L1:CASL.P7.04 RSICC Release Testing Results Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    L1:CASL.P7.04 RSICC Release Testing Results Summary Andrew Godfrey Oak Ridge National Laboratory September 30, 2013 CASL-U-2014-0009-000 Date: 9/30/2013 To: Matt Sieger c: Jess Gehin From: Andrew Godfrey Subject: RSICC Release Testing Results Matt, I have completed a thorough technical review of the VERA capabilities which are being released to RSICC. This memo provides documentation of the readiness of VERA for external release for several specific capabilities. In summary, I have found that

  1. Data summary report for fission product release Test VI-7

    SciTech Connect (OSTI)

    Osborne, M.F.; Lorentz, R.A.; Travis, J.R.; Collins, J.L.; Webster, C.S.

    1995-05-01

    Test VI-7 was the final test in the VI series conducted in the vertical furnace. The fuel specimen was a 15.2-cm-long section of a fuel rod from the Monticello boiling water reactor (BWR). The fuel had experienced a burnup of {approximately}-40 Mwd/kg U. It was heated in an induction furnace for successive 20-min periods at 2000 and 2300 K in a moist air-helium atmosphere. Integral releases were 69% for {sup 85}Kr, 52% for {sup 125}Sb, 71% for both {sup 134}Cs and {sup 137}Cs, and 0.04% for {sup 154}Eu. For the non-gamma-emitting species, release values for 42% for I, 4.1% for Ba, 5.3% for Mo, and 1.2% for Sr were determined. The total mass released from the furnace to the collection system, including fission products, fuel, and structural materials, was 0.89 g, with 37% being collected on the thermal gradient tubes and 63% downstream on filters. Posttest examination of the fuel specimen indicated that most of the cladding was completely oxidized to ZrO{sub 2}, but that oxidation was not quite complete at the upper end. The release behaviors for the most volatile elements, Kr and Cs, were in good agreement with the ORNL-Booth Model.

  2. Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas Kenneth J. Kelly, Brent K. Bailey, and Timothy C. Coburn National Renewable Energy Laboratory Wendy Clark Automotive Testing Laboratories, Inc. Peter Lissiuk Environmental Research and Development Corp. Presented at Society for Automotive Engineers International Spring Fuels and Lubricants Meeting Dearborn, MI May 6-8, 1996 The work described here was wholly funded by the U.S. Department of Energy,

  3. Integrated Disposal Facility FY2010 Glass Testing Summary Report

    SciTech Connect (OSTI)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Serne, R Jeffrey; Mattigod, Shas V.

    2010-09-30

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 × 105 m3 of glass (Puigh 1999). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 0.89 × 1018 Bq total activity) of long-lived radionuclides, principally 99Tc (t1/2 = 2.1 × 105), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessement (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2010 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses. The emphasis in FY2010 was the completing an evaluation of the most sensitive kinetic rate law parameters used to predict glass weathering, documented in Bacon and Pierce (2010), and transitioning from the use of the Subsurface Transport Over Reactive Multi-phases to Subsurface Transport Over Multiple Phases computer code for near-field calculations. The FY2010 activities also consisted of developing a Monte Carlo and Geochemical Modeling framework that links glass composition to alteration phase formation by 1) determining the structure of unreacted and reacted glasses for use as input information into Monte Carlo

  4. Summary of recent Raman Spectroscopy testing of SRS processes

    SciTech Connect (OSTI)

    Fondeur, F. F.; Lascola, R. J.; O'Rourke, P. E.

    2016-01-01

    This report describes several scoping projects conducted at SRNL using Raman spectroscopic methods for monitoring different aspects of nuclear waste and materials processing. One project examined the suitability of a Raman telescope for in situ measurement of solid residues in waste tanks. Characteristics evaluated for this equipment included radiation resistance, ease of use, and sensitivity. A second project monitored the nitrate content in liquid filtrate from the testing of a rotary microfilter using a fiber-based insertion probe. The third project made Raman measurements of various gases, including H2 and NOx, in the headspace of a vessel while dissolving aluminum coupons in nitric acid. Measurements followed the evolution of these species in real time. Although the majority of these projects occurred in the laboratory environment, SRNL has substantial experience with implementing other optical techniques into nuclear materials processing environments. The work described in this report shows the potential of the Raman technology to provide real time measurements of species such as nitrate or hydroxide during sludge washing or evolved gases such as hydrogen or NOx during waste processing.

  5. Integrated Disposal Facility FY2011 Glass Testing Summary Report

    SciTech Connect (OSTI)

    Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.; Windisch, Charles F.; Cantrell, Kirk J.; Valenta, Michelle M.; Burton, Sarah D.; Westsik, Joseph H.

    2011-09-29

    Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 x 10{sup 5} m{sup 3} of glass (Certa and Wells 2010). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 8.9 x 10{sup 14} Bq total activity) of long-lived radionuclides, principally {sup 99}Tc (t{sub 1/2} = 2.1 x 10{sup 5}), planned for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2011 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses.

  6. Fast Flux Test Facility (FFTF) Briefing Book 1 Summary

    SciTech Connect (OSTI)

    WJ Apley

    1997-12-01

    This report documents the results of evaluations preformed during 1997 to determine what, if an, future role the Fast Flux Test Facility (FFTF) might have in support of the Department of Energy’s tritium productions strategy. An evaluation was also conducted to assess the potential for the FFTF to produce medical isotopes. No safety, environmental, or technical issues associated with producing 1.5 kilograms of tritium per year in the FFTF have been identified that would change the previous evaluations by the Department of Energy, the JASON panel, or Putnam, Hayes & Bartlett. The FFTF can be refitted and restated by July 2002 for a total expenditure of $371 million, with an additional $64 million of startup expense necessary to incorporate the production of medical isotopes. Therapeutic and diagnostic applications of reactor-generated medical isotopes will increase dramatically over the next decade. Essential medical isotopes can be produced in the FFTF simultaneously with tritium production, and while a stand-alone medical isotope mission for the facility cannot be economically justified given current marker conditions, conservative estimates based on a report by Frost &Sullivan indicate that 60% of the annual operational costs (reactor and fuel supply) could be offset by revenues from medical isotope production within 10 yeas of restart. The recommendation of the report is for the Department of Energy to continue to maintain the FFTF in standby and proceed with preparation of appropriate Nations Environmental Policy Act documentation in full consultation with the public to consider the FFTF as an interim tritium production option (1.5 kilograms/year) with a secondary mission of producing medical isotopes.

  7. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    SciTech Connect (OSTI)

    Flanagan, B.D.

    1995-07-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the {open_quotes}Free Drop Test{close_quotes} procedure for the SPM-1 package.

  8. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters...

    Office of Environmental Management (EM)

    Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002 Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, ...

  9. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...

    Energy Savers [EERE]

    7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking ...

  10. DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for commercial refrigeration equipment.

  11. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  12. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dehumidifiers, Final Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This document is the Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule. dehumid_tp_finalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice

  13. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clothes Washers, Final Rule | Department of Energy 7: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule This document is the Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule. clothes_washers_tp_finalrule.pdf (1.53 MB) More Documents & Publications 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed

  14. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Chargers, Final Rule | Department of Energy Test Procedure for Battery Chargers, Final Rule ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule This document is the Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule. Battery Chargers TP Final Rule.pdf (449.69 KB) More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy

  15. AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy in Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures Plug-in Hybrid Electric Vehicle Test Plan DRAFT - Integrated Test Plan and Evaluation Program for Review for Plug-in Hybrid Electric Vehicles (PHEVs) (2.33 MB) More Documents & Publications AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Vehicle Technologies Office: 2010 Vehicle and Systems Simulation and Testing

  16. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test ...

  17. BESTEST: Test Procedures Building Energy SimulationŽ Tools

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ron.Judkoff@nrel.gov BESTEST: Test Procedures "Building Energy Simulation" Tools 2014 ... methods of test that can be cited by regulatory bodies for software certification. ...

  18. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information ISSUANCE 2015-12-04: Energy Conservation Standards and Test ...

  19. Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures. For more information on these procedures please click on the items below: Federal Advisory Committee Act Nevada Site Specific Advisory Board Standard Operating Procedures Advisory Committee Management Program Manual National Charter EM Site Specific Advisory Board Policies and Procedures Desk Reference Send mail to

  20. Summary of the 1987 soil sampling effort at the Idaho National Engineering Laboratory Test Reactor Area Paint Shop Ditch

    SciTech Connect (OSTI)

    Wood, T.R.; Knight, J.L.; Hertzler, C.L.

    1989-08-01

    Sampling of the Test Reactor Area (TRA) Paint Shop Ditch at the Idaho National Engineering Laboratory was initiated in compliance with the Interim Agreement between the Department of Energy (DOE) and the Environmental Protection Agency (EPA). Sampling of the TRA Paint Shop Ditch was done as part of the Action Plan to achieve and maintain compliance with the Resource Conservation and Recovery Act (RCRA) and applicable regulations. It is the purpose of this document to provide a summary of the July 6, 1987 sampling activities that occurred in ditch west of Building TRA-662, which housed the TRA Paint Shop in 1987. This report will give a narrative description of the field activities, locations of collected samples, discuss the sampling procedures and the chemical analyses. Also included in the scope of this report is to bring together data and reports on the TRA Paint Shop Ditch for archival purposes. 6 refs., 10 figs., 8 tabs.

  1. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect (OSTI)

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  2. Fixed-bed gasifier and cleanup system engineering summary report through Test Run No. 100

    SciTech Connect (OSTI)

    Pater, K. Jr.; Headley, L.; Kovach, J.; Stopek, D.

    1984-06-01

    The state-of-the-art of high-pressure, fixed-bed gasification has been advanced by the many refinements developed over the last 5 years. A novel full-flow gas cleanup system has been installed and tested to clean coal-derived gases. This report summarizes the results of tests conducted on the gasifier and cleanup system from its inception through 1982. Selected process summary data are presented along with results from complementary programs in the areas of environmental research, process simulation, analytical methods development, and component testing. 20 references, 32 figures, 42 tables.

  3. SUMMARY OF ‘AFIP’ FULL SIZED PLATE IRRADIATIONS IN THE ADVANCED TEST REACTOR

    SciTech Connect (OSTI)

    Robinson, Adam B; Wachs, Daniel M

    2010-03-01

    Recent testing at the Idaho National Laboratory has included four AFIP (ATR Full Size plate In center flux trap Position) experiments. These experiments included both dispersion plates and monolithic plates fabricated by both hot isostatic pressing and friction bonding utilizing both thermally sprayed inter-layers and zirconium barriers. These plates were tested between 100 and 350 w/cm2 at low temperatures and high burn-ups. The post irradiation exams performed have indicated good performance under the conditions tested and a summary of the findings and irradiation history are included herein.

  4. Fire Safety Tests for Spherical Resorcinol Formaldehyde Resin: Data Summary Report

    SciTech Connect (OSTI)

    Kim, Dong-Sang; Peterson, Reid A.; Schweiger, Michael J.

    2012-07-30

    A draft safety evaluation of the scenario for spherical resorcinol-formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping, which may be overly bounding based on the fire performance data from the manufacturer of the ion exchange resin selected for use at the WTP. To resolve this question, the fire properties of the SRF resin were measured by Southwest Research Institute (SwRI), following the American Society for Testing and Materials (ASTM) standard procedures, through a subcontract managed by Pacific Northwest National Laboratory (PNNL). For some tests, the ASTM standard procedures were not entirely appropriate or practical for the SRF resin material, so the procedures were modified and deviations from the ASTM standard procedures were noted. This report summarizes the results of fire safety tests performed and reported by SwRI. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. All as-received SwRI reports are attached to this report in the Appendix. Where applicable, the precision and bias of each test method, as given by each ASTM standard procedure, are included and compared with the SwRI test results of the SRF resin.

  5. ISSUANCE 2015-04-29: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters Notice of petition to extend test procedure compliance date and request for comment

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters; Notice of petition to extend test procedure compliance date and request for comment.

  6. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    SciTech Connect (OSTI)

    Goetzler, William; Sutherland, Timothy; Kar, Rahul; Foley, Kevin

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  7. Test procedure for measurement of performance vs temperature of Whittaker electrochemical cell

    SciTech Connect (OSTI)

    Vargo, G.F.

    1997-01-23

    This document is the test procedure to systematically test the Whittaker cells between the temperatures of -20 degrees F and +120 degrees F. These sensors are used on the Rotary Mode Core Sampling (RMCS) flammable gas interlock (FGI), to detect and quantify hydrogen gas. This procedure supports the testing, that is being performed after cold weather attempts on the Whittaker cell failed.

  8. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards & Labeling Programs for Copy Machines, External Power Supplies, LED Displays, Residential Gas Cooktops and Televisions

    SciTech Connect (OSTI)

    Zheng, Nina; Zhou, Nan; Fridley, David

    2012-03-01

    This report presents a technical review of international minimum energy performance standards (MEPS), voluntary and mandatory energy efficiency labels and test procedures for five products being considered for new or revised MEPS in China: copy machines, external power supply, LED displays, residential gas cooktops and flat-screen televisions. For each product, an overview of the scope of existing international standards and labeling programs, energy values and energy performance metrics and description and detailed summary table of criteria and procedures in major test standards are presented.

  9. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for

    Office of Environmental Management (EM)

    Manufactured Housing, Notice of Proposed Rulemaking | Department of Energy 9: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking. Manufactured Housing TP NOPR.pdf (367.35 KB) More Documents &

  10. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for

    Office of Environmental Management (EM)

    Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking | Department of Energy 26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking. Dedicated Purpose Pool Pumps TP NOPR.pdf

  11. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Power Supplies, Notice of Public Meeting | Department of Energy 29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting This document is the notice of public meeting for Energy Conservation Program: Test Procedures for External Power Supplies. externalpowersupplies_tp_nopm.pdf (236.66 KB) More Documents &

  12. 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers;

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Proposed Rulemaking | Department of Energy 1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedure amendments for residential clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 11, 2014. Though it is not

  13. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps;

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Notice of Proposed Rulemaking | Department of Energy Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for high-intesity discharge lamps, as issued by the Deputy Assistant Secretary for Energy

  14. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability | Department of Energy Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a pre-publication Federal Register notice of data availability regarding test procedures for battery chargers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 8, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted

  15. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lamps; Supplemental Notice of Proposed Rulemaking | Department of Energy 16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for integrated light-emitting diode lamps, as issued by the

  16. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ballasts; Notice of Proposed Rulemaking | Department of Energy 4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14,

  17. 2014-10-16 Issuance: Energy Conservation Program Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Clothes Dryers, Notice of Public Meeting | Department of Energy 6 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting clothes_dryer_nopm.pdf (194.46 KB) More Documents & Publications 2014-01-31

  18. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Rulemaking | Department of Energy 7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any

  19. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Rulemaking | Department of Energy 2 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 12, 2015. Though it is not intended or

  20. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Rulemaking | Department of Energy 3 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for furnaces and boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 13, 2015. Though it is not intended or expected, should any

  1. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ceiling Fans, Supplemental Notice of Proposed Rule | Department of Energy Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ceiling_fans_tp_snopr.pdf (526.51 KB) More Documents & Publications Energy

  2. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conventional Ovens, Final Rule | Department of Energy 18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule This document is the Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule. conventional_ovens_tp_finalrule.pdf (448.83 KB) More Documents & Publications ISSUANCE 2015-05-29: Energy Conservation Program: Energy Conservation

  3. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Chargers, Notice of Proposed Rulemaking | Department of Energy 27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking. battery_chargers_tp_nopr.pdf (336.62 KB) More Documents & Publications ISSUANCE

  4. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compressors, Notice of Proposed Rulemaking | Department of Energy 22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking. Compressors TP NOPR.pdf (970.54 KB) More Documents & Publications Docket # EERE-2014-BT-STD-0051,

  5. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Central Air Conditioners and Heat Pumps Final Rule | Department of Energy 5-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule This document is the Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule. Central Air Conditioners and Heat Pumps TP Final Rule.pdf (2.2 MB) More

  6. DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

  7. 2014-06-27 Issuance: Test Procedures for Residential and Commercial...

    Broader source: Energy.gov (indexed) [DOE]

    solely as a means to facilitate the public's access to this document. 2014-06-27 Test Procedures for Residential and Commercial Water Heaters; Final Rule More Documents &...

  8. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ceiling Fan Light Kits, Final Rule | Department of Energy 15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light

  9. Argonne Facilitation of PHEV Standard Testing Procedure (SAE...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications SAE Standards Development HEV, PHEV, EV Test Standard Development and Validation Off-Cycle Benchmarking of PHEVs; Wide Range of Temperatures and ...

  10. Spent fuel sabotage aerosol test program :FY 2005-06 testing and aerosol data summary.

    SciTech Connect (OSTI)

    Gregson, Michael Warren; Brockmann, John E.; Nolte, O. (Fraunhofer institut fur toxikologie und experimentelle Medizin, Germany); Loiseau, O. (Institut de radioprotection et de Surete Nucleaire, France); Koch, W. (Fraunhofer institut fur toxikologie und experimentelle Medizin, Germany); Molecke, Martin Alan; Autrusson, Bruno (Institut de radioprotection et de Surete Nucleaire, France); Pretzsch, Gunter Guido (Gesellschaft fur anlagen- und Reaktorsicherheit, Germany); Billone, M. C. (Argonne National Laboratory, USA); Lucero, Daniel A.; Burtseva, T. (Argonne National Laboratory, USA); Brucher, W (Gesellschaft fur anlagen- und Reaktorsicherheit, Germany); Steyskal, Michele D.

    2006-10-01

    This multinational, multi-phase spent fuel sabotage test program is quantifying the aerosol particles produced when the products of a high energy density device (HEDD) interact with and explosively particulate test rodlets that contain pellets of either surrogate materials or actual spent fuel. This program has been underway for several years. This program provides source-term data that are relevant to some sabotage scenarios in relation to spent fuel transport and storage casks, and associated risk assessments. This document focuses on an updated description of the test program and test components for all work and plans made, or revised, primarily during FY 2005 and about the first two-thirds of FY 2006. It also serves as a program status report as of the end of May 2006. We provide details on the significant findings on aerosol results and observations from the recently completed Phase 2 surrogate material tests using cerium oxide ceramic pellets in test rodlets plus non-radioactive fission product dopants. Results include: respirable fractions produced; amounts, nuclide content, and produced particle size distributions and morphology; status on determination of the spent fuel ratio, SFR (the ratio of respirable particles from real spent fuel/respirables from surrogate spent fuel, measured under closely matched test conditions, in a contained test chamber); and, measurements of enhanced volatile fission product species sorption onto respirable particles. We discuss progress and results for the first three, recently performed Phase 3 tests using depleted uranium oxide, DUO{sub 2}, test rodlets. We will also review the status of preparations and the final Phase 4 tests in this program, using short rodlets containing actual spent fuel from U.S. PWR reactors, with both high- and lower-burnup fuel. These data plus testing results and design are tailored to support and guide, follow-on computer modeling of aerosol dispersal hazards and radiological consequence

  11. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging.

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  20. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  1. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  2. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  3. Thermal test procedure for a paraboloid concentrator solar cooker

    SciTech Connect (OSTI)

    Mullick, S.C.; Kandpal, T.C.; Kumar, S. )

    1991-01-01

    Suitable thermal tests have been identified for performance evaluation of a concentrating solar cooker. These tests provide parameters that characterize the performance of the solar cooker, and are more or less independent of the climatic variables. The overall heat loss factor is obtained from the cooling curve and the optical efficiency factor is determined from the heating curve - both under full load conditions. The performance characteristic curve for the solar cooker is obtained and discussed. The study indicates that the no load test, which is useful in the case of a box type solar cooker, is not appropriate in the case of concentrator type cookers.

  4. Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues | Department of Energy Procedure - ICM Issues Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues On October 8, 2015, AHRI staff and Independent Coil Manufacturer (ICM) Representatives met with a representative from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners and how they would impact ICM manufacturers. 10_8_15AHRI Ex Parte Memo ICM (53.24 KB) More Documents & Publications Ex Parte Communication

  5. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  6. ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

  7. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

  8. ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  9. 2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

  10. ISSUANCE 2016-03-24: Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

  11. ISSUANCE 2016-08-05: Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

  12. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

  13. ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

  14. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  15. Summary Report on Solid-oxide Electrolysis Cell Testing and Development

    SciTech Connect (OSTI)

    J.E. O'Brien; X. Zhang; R.C. O'Brien; G.L. Hawkes

    2012-01-01

    Idaho National Laboratory (INL) has been researching the application of solid-oxide electrolysis cells (SOECs) for large-scale hydrogen production from steam over a temperature range of 800 to 900 C. From 2003 to 2009, this work was sponsored by the United States Department of Energy Nuclear Hydrogen Initiative, under the Office of Nuclear Energy. Starting in 2010, the high-temperature electrolysis (HTE) research program has been sponsored by the INL Next Generation Nuclear Plant Project. This report provides a summaryof program activities performed in Fiscal Year (FY) 2011 and the first quarter of FY-12, with a focus on small-scale testing and cell development activities. HTE research priorities during this period have included the development and testing of SOEC and stack designs that exhibit high-efficiency initial performance and low, long-term degradation rates. This report includes contributions from INL and five industry partners: Materials and Systems Research, Incorporated (MSRI); Versa Power Systems, Incorporated (VPS); Ceramatec, Incorporated; National Aeronautics and Space Administration - Glenn Research Center (NASA - GRC); and the St. Gobain Advanced Materials Division. These industry partners have developed SOEC cells and stacks for in-house testing in the electrolysis mode and independent testing at INL. Additional fundamental research and post-test physical examinations have been performed at two university partners: Massachusetts Institute of Technology (MIT) and the University of Connecticut. Summaries of these activities and test results are also presented in this report.

  16. Gas characterization system 241-AN-105 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  17. Gas characterization system 241-AW-101 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  18. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    SciTech Connect (OSTI)

    Biyani, R.K.; Hendrickson, D.W.

    1997-07-18

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations.

  19. In-Plane Conductivity Testing Procedures and Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In-Plane Conductivity Testing Procedures and Results In-Plane Conductivity Testing Procedures and Results This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007. htmwg_bekktech.pdf (354.02 KB) More Documents & Publications Requirements for Samples High Temperature Membrane Working Group Minutes Progress and Status on Through-Plane Resistance and Conductivity Measurement of Fuel Cell Membranes

  20. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    SciTech Connect (OSTI)

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  1. Summary of TRUEX Radiolysis Testing Using the INL Radiolysis Test Loop

    SciTech Connect (OSTI)

    Dean R. Peterman; Lonnie G. Olson; Rocklan G. McDowell; Gracy Elias; Jack D. Law

    2012-03-01

    The INL radiolysis and hydrolysis test loop has been used to evaluate the effects of hydrolytic and radiolytic degradation upon the efficacy of the TRUEX flowsheet for the recovery of trivalent actinides and lanthanides from acidic solution. Repeated irradiation and subsequent re-conditioning cycles did result in a significant decrease in the concentration of the TBP and CMPO extractants in the TRUEX solvent and a corresponding decrease in americium and europium extraction distributions. However, the build-up of solvent degradation products upon {gamma}-irradiation, had little impact upon the efficiency of the stripping section of the TRUEX flowsheet. Operation of the TRUEX flowsheet would require careful monitoring to ensure extraction distributions are maintained at acceptable levels.

  2. Accidental oil spill due to grounding: Summary of model test results. Summary report, Jan-Jun 92

    SciTech Connect (OSTI)

    Karafiath, G.

    1992-06-01

    The International Maritime Organization (IMO) sponsored model tests to help in their evaluation of accidental oil spillage from a Mid-Deck Tanker (MDT) and from a Double Hull Tanker (DHT) Design. These tests were conducted at Tsukuba Institute, Japan, and at the Carderock Division, Naval Surface Warfare Center. The test results are explained herein and their significance is summarized.

  3. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE-2015-BT-TP-0007-0002 | Department of Energy Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002 Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002 Energy Conservation Program for Consumer Products and Certain Industrial Equipment: Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002, specifically issues surrounding the Conversion Factor status. EXPARTE MEMO 4 26-rbc (83.88 KB) More Documents

  4. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  5. 2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

  6. Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure

    SciTech Connect (OSTI)

    ZAKRAJSEK, M.F.

    2000-10-17

    The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

  7. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

  8. 2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  9. 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 31, 2014.

  10. CRAD, System Operating Test Procedures- October 23, 2014 (EA CRAD 31-05, Rev. 0)

    Broader source: Energy.gov [DOE]

    This Criteria Review and Approach Document (EA CRAD 31-05, Rev. 0) provides objectives, criteria, and approaches for reviewing startup testing procedures for installed structures, systems, or components.

  11. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    SciTech Connect (OSTI)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  12. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting | Department of Energy 01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting This document is a pre-publication Federal Register notice of proposed rulemaking and public meeting regarding

  13. Meeting Summary Notes

    Office of Environmental Management (EM)

    records check list: Information that should be requested by SOMD of receiving facility Medical records: Problem list: list of all past and current medical diagnosis and surgical procedures. Medication list Physical exam notes Lab and diagnostic testing results Pertinent HRP notes. (temporary removals, medical and psychological issues) Psychiatric records: A summary or actual note of the psychiatric or psychological evaluation

    Medical Records Checklist - September 14, 2010 Medical Records

  14. Fire Safety Tests for Cesium-Loaded Spherical Resorcinol Formaldehyde Resin: Data Summary Report

    SciTech Connect (OSTI)

    Kim, Dong-Sang; Schweiger, Michael J.; Peterson, Reid A.

    2012-09-01

    A draft safety evaluation of the scenario for spherical resorcinol formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping. To resolve this question, the fire properties of the SRF resin were measured by Southwest Research Institute (SwRI) through a subcontract managed by Pacific Northwest National Laboratory (PNNL). The results of initial fire safety tests on the SRF resin were documented in a previous report (WTP-RPT-218). The present report summarizes the results of additional tests performed by SwRI on the cesium-loaded SRF resin. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. The as-received SwRI report is attached to this report in the Appendix A. Where applicable, the precision and bias of each test method, as given by each American Society for Testing and Materials (ASTM) standard procedure, are included and compared with the SwRI test results of the cesium-loaded SRF resin.

  15. In Situ Decommissioning Sensor Network, Meso-Scale Test Bed - Phase 3 Fluid Injection Test Summary Report

    SciTech Connect (OSTI)

    Serrato, M. G.

    2013-09-27

    located at the Florida International University Applied Research Center, Miami, FL (FIU-ARC). A follow-on fluid injection test was developed to detect fluid and ion migration in a cementitious material/grouted test cube using a limited number of existing embedded sensor systems. This In Situ Decommissioning Sensor Network, Meso-Scale Test Bed (ISDSN-MSTB) - Phase 3 Fluid Injection Test Summary Report summarizes the test implementation, acquired and processed data, and results from the activated embedded sensor systems used during the fluid injection test. The ISDSN-MSTB Phase 3 Fluid Injection Test was conducted from August 27 through September 6, 2013 at the FIU-ARC ISDSN-MSTB test cube. The fluid injection test activated a portion of the existing embedded sensor systems in the ISDSN-MSTB test cube: Electrical Resistivity Tomography-Thermocouple Sensor Arrays, Advance Tensiometer Sensors, and Fiber Loop Ringdown Optical Sensors. These embedded sensor systems were activated 15 months after initial placement. All sensor systems were remotely operated and data acquisition was completed through the established Sensor Remote Access System (SRAS) hosted on the DOE D&D Knowledge Management Information Tool (D&D DKM-IT) server. The ISDN Phase 3 Fluid Injection Test successfully demonstrated the feasibility of embedding sensor systems to assess moisture-fluid flow and resulting transport potential for contaminate mobility through a cementitious material/grout monolith. The ISDSN embedded sensor systems activated for the fluid injection test highlighted the robustness of the sensor systems and the importance of configuring systems in-depth (i.e., complementary sensors and measurements) to alleviate data acquisition gaps.

  16. Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

    SciTech Connect (OSTI)

    Rice, C. Keith; Munk, Jeffrey D.; Shrestha, Som S.

    2015-08-01

    This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

  17. Accuracy of the European solar water heater test procedure. Part 1: Measurement errors and parameter estimates

    SciTech Connect (OSTI)

    Rabl, A.; Leide, B. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    The Collector and System Testing Group (CSTG) of the European Community has developed a procedure for testing the performance of solar water heaters. This procedure treats a solar water heater as a black box with input-output parameters that are determined by all-day tests. In the present study the authors carry out a systematic analysis of the accuracy of this procedure, in order to answer the question: what tolerances should one impose for the measurements and how many days of testing should one demand under what meteorological conditions, in order to be able to quarantee a specified maximum error for the long term performance The methodology is applicable to other test procedures as well. The present paper (Part 1) examines the measurement tolerances of the current version of the procedure and derives a priori estimates of the errors of the parameters; these errors are then compared with the regression results of the Round Robin test series. The companion paper (Part 2) evaluates the consequences for the accuracy of the long term performance prediction. The authors conclude that the CSTG test procedure makes it possible to predict the long term performance with standard errors around 5% for sunny climates (10% for cloudy climates). The apparent precision of individual test sequences is deceptive because of large systematic discrepancies between different sequences. Better results could be obtained by imposing tighter control on the constancy of the cold water supply temperature and on the environment of the test, the latter by enforcing the recommendation for the ventilation of the collector.

  18. Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results

    SciTech Connect (OSTI)

    Muller, M.

    2009-09-01

    This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

  19. Summary, biomass gasifier facility start-up tests - October and December 1995

    SciTech Connect (OSTI)

    Turn, S.Q.; Ishimura, D.M.; Kinoshita, C.M.; Masutani, S.M.

    1996-02-01

    Shakedown testing of the biomass gasifier facility, located at the Hawaiian Commercial and Sugar Co. factory in Paia on the island of Maui, utilizing sugarcane bagasse, occurred in October 1995. Input and output streams for the process were sampled during three periods of steady-state operation in an air-blown mode. Additional tests were carried out in early December, 1995. Air and a mixture of air and steam were utilized as the fluidizing agent in the December operations, with two sampling periods occurring during air gasification and a single period under air-steam-blown conditions. This summary reports average values for the October test period, the December air-blown tests and the December air-steam tests (see following table). Details of individual tests are presented in the body of this report. During the October sampling periods, the average reactor temperature and pressure were 1545{degrees}F (840{degrees}C) and 43 psi (300 kPa), respectively. Bagasse from the sugar factory entered the dryer at a nominal moisture content of 45% and exited at 26%, wet basis. Wet fuel feed rate to the reactor averaged 1.2 ton hr{sup -1} (1.1 tonne hr{sup -1}). Average gas composition determined over the sample periods was 4% H{sub 2}, 10% CO, 18% CO{sub 2}, 3% CH{sub 4}, 1% C{sub 2}`s and higher hydrocarbons, and the balance N{sub 2}. The higher heating value of the gas was 100 Btu ft{sup -3} (3.7 MJ m{sup -3}). Condensable hydrocarbons (C{sub 6} and higher) in the output stream averaged 2.3% of dry fuel feed with benzene (C{sub 6}H{sub 6}) and naphthalene (C{sub 10}H{sub 8}) being the principal constituents. Carbon conversion efficiency, defined as the percentage of fuel carbon converted into gas or liquids, was estimated to be {approximately}96%.

  20. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  1. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  2. Field Testing of Energy-Efficient Flood-Damage-Resistant Residential Envelope Systems Summary Report

    SciTech Connect (OSTI)

    Aglan, H.

    2005-08-04

    The primary purpose of the project was to identify materials and methods that will make the envelope of a house flood damage resistant. Flood damage resistant materials and systems are intended to be used to repair houses subsequent to flooding. This project was also intended to develop methods of restoring the envelopes of houses that have been flooded but are repairable and may be subject to future flooding. Then if the house floods again, damage will not be as extensive as in previous flood events and restoration costs and efforts will be minimized. The purpose of the first pair of field tests was to establish a baseline for typical current residential construction practice. The first test modules used materials and systems that were commonly found in residential envelopes throughout the U.S. The purpose of the second pair of field tests was to begin evaluating potential residential envelope materials and systems that were projected to be more flood-damage resistant and restorable than the conventional materials and systems tested in the first pair of tests. The purpose of testing the third slab-on-grade module was to attempt to dry flood proof the module (no floodwater within the structure). If the module could be sealed well enough to prevent water from entering, then this would be an effective method of making the interior materials and systems flood damage resistant. The third crawl space module was tested in the same manner as the previous modules and provided an opportunity to do flood tests of additional residential materials and systems. Another purpose of the project was to develop the methodology to collect representative, measured, reproducible (i.e. scientific) data on how various residential materials and systems respond to flooding conditions so that future recommendations for repairing flood damaged houses could be based on scientific data. An additional benefit of collecting this data is that it will be used in the development of a standard test

  3. Summary_of_Tele_Conf.PDF | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary_of_Tele_Conf.PDF Summary_of_Tele_Conf.PDF (78.5 KB) More Documents & Publications ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx

  4. Summary Of Cold Crucible Vitrification Tests Results With Savannah River Site High Level Waste Surrogates

    SciTech Connect (OSTI)

    Stefanovsky, Sergey; Marra, James; Lebedev, Vladimir

    2014-01-13

    The cold crucible inductive melting (CCIM) technology successfully applied for vitrification of low- and intermediate-level waste (LILW) at SIA Radon, Russia, was tested to be implemented for vitrification of high-level waste (HLW) stored at Savannah River Site, USA. Mixtures of Sludge Batch 2 (SB2) and 4 (SB4) waste surrogates and borosilicate frits as slurries were vitrified in bench- (236 mm inner diameter) and full-scale (418 mm inner diameter) cold crucibles. Various process conditions were tested and major process variables were determined. Melts were poured into 10L canisters and cooled to room temperature in air or in heat-insulated boxes by a regime similar to Canister Centerline Cooling (CCC) used at DWPF. The products with waste loading from ~40 to ~65 wt.% were investigated in details. The products contained 40 to 55 wt.% waste oxides were predominantly amorphous; at higher waste loadings (WL) spinel structure phases and nepheline were present. Normalized release values for Li, B, Na, and Si determined by PCT procedure remain lower than those from EA glass at waste loadings of up to 60 wt.%.

  5. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Office of Energy Efficiency and Renewable Energy (EERE)

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  6. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect (OSTI)

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  7. ARM - Research Highlights Summaries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govPublicationsResearch Highlights Summaries Publications Journal Articles Conference Documents Program Documents & Technical Reports Publications Database Public Information Materials Image Library Videos Publication Resources Submit a Publication Publishing Procedures ARM Style Guide (PDF, 448KB) Acronyms Glossary Logos Contacts RSS for Publications Research Highlights Summaries Research Highlights Summaries are a collection of selected Research Highlights that are condensed and formatted

  8. Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1

    SciTech Connect (OSTI)

    Satoh, J.A.

    1995-05-25

    This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

  9. DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for residential water heaters and certain commercial water heaters.

  10. Operability test procedure for rotary mode core sampling system {number_sign}4

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  11. Operability test procedure for rotary mode core sampling system {number_sign}3

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  12. Comparison of Real World Energy Consumption to Models and DOE Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures September 2011 i NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness,

  13. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  14. 2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  15. 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Final Rule regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 24, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  16. 2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  17. 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Rocky Mountain Oilfield Testing Center . The Rocky Mountain Oilfield Testing...

  18. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance. [Contains Glossary

    SciTech Connect (OSTI)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs.

  19. ISSUANCE 2016-02-22: Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers

  20. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

  1. Summary of results from the Series 2 and Series 3 NNWSI [Nevada Nuclear Waste Storage Investigations] bare fuel dissolution tests

    SciTech Connect (OSTI)

    Wilson, C.N.

    1987-11-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project is studying dissolution and radionuclide release behavior of spent nuclear fuel in Nevada Test Site groundwater. Specimens were tested for multiple cycles in J-13 well water. The Series 2 tests were run in unsealed silica vessels under ambient hot cell air (25{sup 0}C) for five cycles for a total of 34 months. The Series 3 tests were run in sealed stainless steel vessels at 25{sup 0}C and 85{sup 0}C for three cycles for a total of 15 months. Selected summary results from Series 2 and Series 3 tests with bare fuel specimens are reported. Uranium concentrations in later test cycles ranged from 1 to 2 {mu}g/ml in the Series 2 Tests versus about 0.1 to 0.4 {mu}g/ml in Series 3 with the lowest concentrations occurring in the 85{sup 0}C tests. Preferential release of fission products Cs, I, Sr and Tc, and activation product C-14, was indicated relative to the actinides. Tc-99 and Cs-137 activities measured in solution after Cycle 1 increased linearly with time, with the rate of increase greater at 85{sup 0}C than at 25{sup 0}C. 8 refs., 8 figs., 3 tabs.

  2. Performance testing of HEPA filters: Progress towards a European standard procedure

    SciTech Connect (OSTI)

    Dyment, J.

    1997-08-01

    Proposals for a future European testing procedure for {open_quotes}High Efficiency Particulate Air Filters (HEPA and ULPA){close_quotes} are being developed by CEN (Comite Europeen de Normalisation). The new standard will be given the status of national standard in participating countries, conflicting national standards being withdrawn. The standard will comprise 5 parts covering the grouping and classification of HEPA and ULPA filters according to their efficiency, fundamental principles of testing, marking etc (in part 1). Part 2 will cover aerosol production, measurement principles, counting equipment and statistics. Parts 3-5 will cover testing flat sheet media, leak testing of filter elements and the efficiency testing of filter elements respectively. The efficiency test methods allow the use of either homogeneous monodisperse or polydisperse aerosols for the determination of particulate filtration efficiencies as a function of particle size. The particle size at which maximum penetration occurs is first determined in flat sheet media tests; tests on filter elements (constructed using the same filter medium) may be carried out using either a homogeneous monodisperse aerosol of the size at which maximum penetration occurs (MPPS) or a polydisperse aerosol whose median size is close to the MPPS. Tests with monodisperse aerosols may be conducted using condensation nucleus counting equipment; tests using polydisperse test aerosols require the use of optical sizing particle counters. When determining the efficiency of filter elements the downstream aerosol concentrations may be determined from air samples obtained using either an overall method (single point sampling after mixing) or a scan method. The scan method also allows {open_quotes}local{close_quotes} efficiency values to be determined. 1 ref., 1 fig., 1 tab.

  3. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel to nickel-copper

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2301-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel, NO2200 or NO2201 (P-41) to nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  4. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel-copper

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-1302-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  5. Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014

    SciTech Connect (OSTI)

    Alan Giesbrecht

    2014-05-01

    The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

  6. Summary report on parametric pressure propagation test T0127-1

    SciTech Connect (OSTI)

    Fauske, H.K.

    1993-06-01

    This report presents the results of two ferrocyanide propagating reaction generated aerosol tests, conducted as a part of a series of tests directed by Westinghouse Hanford Company (WHC). The tests discussed in this document are designated as T0208-1 and T0209-1. The tests were carried out in a 49 L containment volume equipped with an aerosol filter housing. The test setup is described in Section 2.0. Each test used an {approx} 50 gm. sample of InFarm-1 bottom flow sheet material which was vacuum dried, screened through a 140 mesh sieve, and rehydrated to 1 wgt. % water content prior to testing. The test sample and reaction ignition method are described in Section 3.0. A special test protocol was defined and followed for the tests as described in Section 4.0 and Appendix B. Test results are discussed in Section 5.0. Both tests yielded a significant aerosol sample on the filter element. These filter elements and aerosol deposits have been sent to WHC for analysis, and any information as to the content or chemical composition of the trapped particulate material awaits the results of WHC efforts in this regard. The reaction propagation tests were conducted at 60{degrees}C and 120{degrees}C respectively. The average propagation velocities are consistent with other related observations.

  7. Summary of Technical Meeting To Compare US/French Approaches for Physical Protection Test Beds

    SciTech Connect (OSTI)

    Mack, Thomas Kimball; Martinez, Ruben; Thomas, Gerald; Palut, Jean-Michel

    2016-01-01

    In September 2015, representatives of the US Department of Energy/National Nuclear Security Administration, including test bed professionals from Sandia National Laboratories, and representatives of the French Alternative Energies and Atomic Energy Commission participated in a one-week workshop to share best practices in design, organization, operations, utilization, improvement, and performance testing of physical protection test beds. The intended workshop outcomes were to (1) share methods of improving respective test bed methodologies and programs and (2) prepare recommendations for standards regarding creating and operating testing facilities for nations new to nuclear operations. At the workshop, the French and American subject matter experts compared best practices as developed at their respective test bed sites; discussed access delay test bed considerations; and presented the limitations/ constraints of physical protection test beds.

  8. Summary of NREL's Recent Class 8 Tractor Trailer Platooning Testing (Presentation)

    SciTech Connect (OSTI)

    Lammert, M.; Kelly, K.; Walkowicz, K.

    2014-08-01

    This presentation summarizes NREL's recent class 8 tractor trailer platooning testing, including analysis of SAE J1321 Type II fuel consumption testing, fuel consumption improvement, fuel economy and platooning position accuracy.

  9. Summary Report on FY12 Small-Scale Test Activities High Temperature Electrolysis Program

    SciTech Connect (OSTI)

    James O'Brien

    2012-09-01

    This report provides a description of the apparatus and the single cell testing results performed at Idaho National Laboratory during JanuaryAugust 2012. It is an addendum to the Small-Scale Test Report issued in January 2012. The primary program objectives during this time period were associated with design, assembly, and operation of two large experiments: a pressurized test, and a 4 kW test. Consequently, the activities described in this report represent a much smaller effort.

  10. 2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  11. 2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  12. DOE response to questions from AHAM on the supplemental proposed test procedure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers"? (1) What exactly does the language in Part B mean and what is the intent? * The intent of Part B is to use the methodology that AHAM had suggested specifically for extra-hot cycles, but to make it more broadly applicable to any temperature combination that is locked out of the Normal cycle. * The proposed Part (B) language is meant to be consistent with GE's original suggestion in

  13. Surrogate/spent fuel sabotage aerosol ratio testing:phase 1 summary and results.

    SciTech Connect (OSTI)

    Vigil, Manuel Gilbert; Sorenson, Ken Bryce; Lange, F. , Germany); Nolte, O. (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Koch, W. (Fraunhofer Institut fur Toxikologie und Experimentelle Medizin, Germany); Dickey, Roy R.; Yoshimura, Richard Hiroyuki; Molecke, Martin Alan; Autrusson, Bruno (Institut de Radioprotection et de Surete Nucleaire , France); Young, F. I.; Pretzsch, Gunter Guido (Gesellschaft fur Anlagen- und reaktorsicherheit , Germany)

    2005-10-01

    This multinational test program is quantifying the aerosol particulates produced when a high energy density device (HEDD) impacts surrogate material and actual spent fuel test rodlets. The experimental work, performed in four consecutive test phases, has been in progress for several years. The overall program provides needed data that are relevant to some sabotage scenarios in relation to spent fuel transport and storage casks, and associated risk assessments. This program also provides significant political benefits in international cooperation for nuclear security related evaluations. The spent fuel sabotage--aerosol test program is coordinated with the international Working Group for Sabotage Concerns of Transport and Storage Casks (WGSTSC), and supported by both the U.S. Department of Energy and Nuclear Regulatory Commission. This report summarizes the preliminary, Phase 1 work performed in 2001 and 2002 at Sandia National Laboratories and the Fraunhofer Institute, Germany, and documents the experimental results obtained, observations, and preliminary interpretations. Phase 1 testing included: performance quantifications of the HEDD devices; characterization of the HEDD or conical shaped charge (CSC) jet properties with multiple tests; refinement of the aerosol particle collection apparatus being used; and, CSC jet-aerosol tests using leaded glass plates and glass pellets, serving as representative brittle materials. Phase 1 testing was quite important for the design and performance of the following Phase 2 test program and test apparatus.

  14. Baseline tests for arc melter vitrification of INEL buried wastes. Volume 1: Facility description and summary data report

    SciTech Connect (OSTI)

    Oden, L.L.; O`Connor, W.K.; Turner, P.C.; Soelberg, N.R.; Anderson, G.L.

    1993-11-19

    This report presents field results and raw data from the Buried Waste Integrated Demonstration (BWID) Arc Melter Vitrification Project Phase 1 baseline test series conducted by the Idaho National Engineering Laboratory (INEL) in cooperation with the U.S. Bureau of Mines (USBM). The baseline test series was conducted using the electric arc melter facility at the USBM Albany Research Center in Albany, Oregon. Five different surrogate waste feed mixtures were tested that simulated thermally-oxidized, buried, TRU-contaminated, mixed wastes and soils present at the INEL. The USBM Arc Furnace Integrated Waste Processing Test Facility includes a continuous feed system, the arc melting furnace, an offgas control system, and utilities. The melter is a sealed, 3-phase alternating current (ac) furnace approximately 2 m high and 1.3 m wide. The furnace has a capacity of 1 metric ton of steel and can process as much as 1,500 lb/h of soil-type waste materials. The surrogate feed materials included five mixtures designed to simulate incinerated TRU-contaminated buried waste materials mixed with INEL soil. Process samples, melter system operations data and offgas composition data were obtained during the baseline tests to evaluate the melter performance and meet test objectives. Samples and data gathered during this program included (a) automatically and manually logged melter systems operations data, (b) process samples of slag, metal and fume solids, and (c) offgas composition, temperature, velocity, flowrate, moisture content, particulate loading and metals content. This report consists of 2 volumes: Volume I summarizes the baseline test operations. It includes an executive summary, system and facility description, review of the surrogate waste mixtures, and a description of the baseline test activities, measurements, and sample collection. Volume II contains the raw test data and sample analyses from samples collected during the baseline tests.

  15. Compilation of ETR Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ETR Summaries Compilation of ETR Summaries ETR Summaries from 2011 Compilation of ETR Summaries (1.18 MB) More Documents & Publications ARROW-PAK Disposal Practices at the Nevada Test Site 2008 Disposal Practices at the Savannah River Site

  16. Summary of results from velocity profile tests and wastage tests in support of LLTR series II test A-4. [Large Leak Test Rig

    SciTech Connect (OSTI)

    Greene, D.A.

    1981-01-01

    The following conclusions were drawn from the experimental program conducted in support of LLTR (Large Leak Test Rig) Series II Test A-4: Fabrication technique for making precise slits was developed. Wastage boundary agrees with velocity profile boundary. Circumferential slit angles would have to be 120/sup 0/ to ensure adequate coverage of adjacent tubes. 120/sup 0/ circumferential slit weakens tubes such that maintaining desired slit dimensions for LLTI application is not considered practical. Use of intermittent slit geometry would be required. 120/sup 0/ slits, precisely machined and precisely aligned with target tubes, produced different penetration rates on adjacent tubes. Production of simultaneous failures in LLTI with 120/sup 0/ slit or simulated interrupted slit is not considered credible.

  17. Process Knowledge Summary Report for Advanced Test Reactor Complex Contact-Handled Transuranic Waste Drum TRA010029

    SciTech Connect (OSTI)

    B. R. Adams; R. P. Grant; P. R. Smith; J. L. Weisgerber

    2013-09-01

    This Process Knowledge Summary Report summarizes information collected to satisfy the transportation and waste acceptance requirements for the transfer of one drum containing contact-handled transuranic (TRU) actinide standards generated by the Idaho National Laboratory at the Advanced Test Reactor (ATR) Complex to the Advanced Mixed Waste Treatment Project (AMWTP) for storage and subsequent shipment to the Waste Isolation Pilot Plant for final disposal. The drum (i.e., Integrated Waste Tracking System Bar Code Number TRA010029) is currently stored at the Materials and Fuels Complex. The information collected includes documentation that addresses the requirements for AMWTP and applicable sections of their Resource Conservation and Recovery Act permits for receipt and disposal of this TRU waste generated from ATR. This Process Knowledge Summary Report includes information regarding, but not limited to, the generation process, the physical form, radiological characteristics, and chemical contaminants of the TRU waste, prohibited items, and packaging configuration. This report, along with the referenced supporting documents, will create a defensible and auditable record for this TRU waste originating from ATR.

  18. CALiPER Summary of Results. Round 13 of Product Testing

    SciTech Connect (OSTI)

    none,

    2011-10-01

    The Department of Energy (DOE) Commercially Available Light-Emitting Diode (LED) Product Evaluation and Reporting (CALiPER) Program has been purchasing and testing general illumination solid-state lighting (SSL) products since 2006.

  19. High Temperature Gas-Cooled Test Reactor Point Design: Summary Report

    SciTech Connect (OSTI)

    Sterbentz, James William; Bayless, Paul David; Nelson, Lee Orville; Gougar, Hans David; Strydom, Gerhard

    2016-01-01

    A point design has been developed for a 200-MW high-temperature gas-cooled test reactor. The point design concept uses standard prismatic blocks and 15.5% enriched uranium oxycarbide fuel. Reactor physics and thermal-hydraulics simulations have been performed to characterize the capabilities of the design. In addition to the technical data, overviews are provided on the technology readiness level, licensing approach, and costs of the test reactor point design.

  20. 2008 Annual Merit Review Results Summary - 3. Battery Development, Testing, Simulation, Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-1 3. Battery Development, Testing, Simulation, Analysis Introduction Battery systems research focuses on testing, evaluating, and developing energy storage technologies in close collaboration with developers and the automotive industry. This work is primarily accomplished through the United States Advanced Battery Consortium (USABC), a partnership among the U.S. Department of Energy (DOE) and DaimlerChrysler, Ford, and General Motors. Working with manufacturers and the DOE national

  1. Photogrammetry and Laser Imagery Tests for Tank Waste Volume Estimates: Summary Report

    SciTech Connect (OSTI)

    Field, Jim G.

    2013-03-27

    Feasibility tests were conducted using photogrammetry and laser technologies to estimate the volume of waste in a tank. These technologies were compared with video Camera/CAD Modeling System (CCMS) estimates; the current method used for post-retrieval waste volume estimates. This report summarizes test results and presents recommendations for further development and deployment of technologies to provide more accurate and faster waste volume estimates in support of tank retrieval and closure.

  2. Summary of three dimensional pump testing of a fractured rock aquifer in the western Siberian Basin

    SciTech Connect (OSTI)

    Nichols, R.L.; Looney, B.B.; Eddy-Dilek, C.A.; Drozhko, E.G.; Glalolenko, Y.V.; Mokrov, Y.G.; Ivanov, I.A.; Glagolev, A.V.; Vasil`kova, N.A.

    1996-10-30

    A group of scientists from the Savannah River Technology Center and Russia successfully completed a 17 day field investigation of a fractured rock aquifer at the MAYAK PA nuclear production facility in Russia. The test site is located in the western Siberian Basin near the floodplain of the Mishelyak river. The fractured rock aquifer is composed of orphyrites, tuff, tuffbreccia and lava and is overlain by 0.5--12 meters of elluvial and alluvial sediments. A network of 3 uncased wells (176, 1/96, and 2/96) was used to conduct the tests. Wells 176 and 2/96 were used as observation wells and the centrally located well 1/96 was used as the pumping well. Six packers were installed and inflated in each of the observation wells at a depth of up to 85 meters. The use of 6 packers in each well resulted in isolating 7 zones for monitoring. The packers were inflated to different pressures to accommodate the increasing hydrostatic pressure. A straddle packer assembly was installed in the pumping well to allow testing of each of the individual zones isolated in the observation wells. A constant rate pumping test was run on each of the 7 zones. The results of the pumping tests are included in Appendix A. The test provided new information about the nature of the fractured rock aquifers in the vicinity of the Mishelyak river and will be key information in understanding the behavior of contaminants originating from process wastes discharged to Lake Karachi. Results from the tests will be analyzed to determine the hydraulic properties of different zones within the fractured rock aquifer and to determine the most cost effective clean-up approach for the site.

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... administrative controls, worker training, industrial hygiene procedures, occupational medicine programs and oversight 2009-present" Final Meeting Summary Page 4 Health, Safety ...

  4. TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY

    SciTech Connect (OSTI)

    Stefanko, D.; Langton, C.

    2012-01-03

    High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale up test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.

  5. Free-piston Stirling engine experimental program: Part 1. Baseline test summary

    SciTech Connect (OSTI)

    Berggren, R.; Moynihan, T.

    1983-06-01

    Free-Piston Stirling Engine experimental data are presented from a series of tests that establish the operating characteristics of the engine and determine performance repeatability. The operating envelope of the engine was to determine maximum parameter range and repeatability. Tests were then carried out in which individual operating parameters were varied while others were maintained constant. These data establish the baseline operation of the engine as a preliminary to a series of tests in which several suspected sources of energy loss are investigated by changing the engine geometry to isolate and magnify each suspected loss mechanism. Performance with the geometry change is compared against baseline operation to quantify the magnitude of the loss mechanism under investigation. The results of the loss mechanism investigation are presented in Part 2 of this report.

  6. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    SciTech Connect (OSTI)

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  7. Advanced Vehicle Testing Activity: Hydrogen-Fueled Mercedes Sprinter Van -- Operating Summary

    SciTech Connect (OSTI)

    Karner, D.; Francfort, James Edward

    2003-01-01

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy's Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure- hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service's Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents results of testing conducted over 6,864 kilometers (4,265 miles) of operation using the pure-hydrogen-fueled Mercedes Sprinter van.

  8. Advanced Vehicle Testing Activity: Hydrogen-Fueled Mercedes Sprinter Van Operating Summary - January 2003

    SciTech Connect (OSTI)

    Karner, D.; Francfort, J.E.

    2003-01-22

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy's Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service's Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents results of testing conducted over 6,864 kilometers (4,265 miles) of operation using the pure-hydrogen-fueled Mercedes Sprinter van.

  9. Advanced Vehicle Testing Activity: High-Percentage Hydrogen/CNG Blend, Ford F-150 -- Operating Summary

    SciTech Connect (OSTI)

    Don Karner; Francfort, James Edward

    2003-01-01

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy’s Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service’s Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents the results of 4,695 miles of testing for one of the blended fuel vehicles, a Ford F-150 pickup truck, operating on up to 50% hydrogen–50% CNG fuel.

  10. Advanced Vehicle Testing Activity: Dodge Ram Wagon Van - Hydrogen/CNG Operations Summary - January 2003

    SciTech Connect (OSTI)

    Karner, D.; Francfort, J.E.

    2003-01-16

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy's Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle, a Dodge Ram Wagon Van, operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service's Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents results of 22,816 miles of testing for the Dodge Ram Wagon Van, operating on CNG fuel, and a blended fuel of 15% hydrogen-85% CNG.

  11. Advanced Vehicle Testing Activity: Dodge Ram Wagon Van -- Hydrogen/CNG Operations Summary

    SciTech Connect (OSTI)

    Don Karner; Francfort, James Edward

    2003-01-01

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy’s Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle, a Dodge Ram Wagon Van, operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service’s Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents results of 22,816 miles of testing for the Dodge Ram Wagon Van, operating on CNG fuel, and a blended fuel of 15% hydrogen–85% CNG.

  12. Advanced Vehicle Testing Activity: Low-Percentage Hydrogen/CNG Blend, Ford F-150 -- Operating Summary

    SciTech Connect (OSTI)

    Karner, D.; Francfort, James Edward

    2003-01-01

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy’s Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service’s Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents results of 16,942 miles of testing for one of the blended fuel vehicles, a Ford F-150 pickup truck, operating on up to 30% hydrogen/70% CNG fuel.

  13. Summary of Testing of SuperLig 639 at the TFL Ion Exchange Facility

    SciTech Connect (OSTI)

    Steimke, J.L.

    2000-12-19

    A pilot scale facility was designed and built in the Thermal Fluids Laboratory at the Savannah River Technology Center to test ion exchange resins for removing technetium and cesium from simulated Hanford Low Activity Waste (LAW). The facility supports the design of the Hanford River Protection Project for BNFL, Inc. The pilot scale system mimics the full-length of the columns and the operational scenario of the planned ion exchange system. Purposes of the testing include confirmation of the design, evaluation of methods for process optimization and developing methods for waste volume minimization. This report documents the performance of the technetium removal resin.

  14. IFT&E Industry Report Wind Turbine-Radar Interference Test Summary.

    SciTech Connect (OSTI)

    Karlson, Benjamin; LeBlanc, Bruce Philip; Minster, David G; Estill, Milford; Miller, Bryan Edward; Busse, Franz; Keck, Chris; Sullivan, Jonathan; Brigada, David; Parker, Lorri; Younger, Richard; Biddle, Jason

    2014-10-01

    Wind turbines have grown in size and capacity with today's average turbine having a power capacity of around 1.9 MW, reaching to heights of over 495 feet from ground to blade tip, and operating with speeds at the tip of the blade up to 200 knots. When these machines are installed within the line-of-sight of a radar system, they can cause significant clutter and interference, detrimentally impacting the primary surveillance radar (PSR) performance. The Massachusetts Institute of Technology's Lincoln Laboratory (MIT LL) and Sandia National Laboratories (SNL) were co-funded to conduct field tests and evaluations over two years in order to: I. Characterize the impact of wind turbines on existing Program-of-Record (POR) air surveillance radars; II. Assess near-term technologies proposed by industry that have the potential to mitigate the interference from wind turbines on radar systems; and III. Collect data and increase technical understanding of interference issues to advance development of long-term mitigation strategies. MIT LL and SNL managed the tests and evaluated resulting data from three flight campaigns to test eight mitigation technologies on terminal (short) and long-range (60 nmi and 250 nmi) radar systems. Combined across the three flight campaigns, more than 460 of hours of flight time were logged. This paper summarizes the Interagency Field Test & Evaluation (IFT&E) program and publicly- available results from the tests. It will also discuss the current wind turbine-radar interference evaluation process within the government and a proposed process to deploy mitigation technologies.

  15. Summary of raman cone penetrometer probe waste tank radiation and chemical environment test

    SciTech Connect (OSTI)

    Reich, F.R.

    1996-09-27

    This report summarizes the results of testing Raman sapphire windows that were braze mounted into a mockup Raman probe head and stainless steel coupons in a simulated tank waste environment. The simulated environment was created by exposing sapphire window components, immersed in a tank simulant, in a gamma pit. This work was completed for the U.S. Department of Energy (DOE) Office of Environmental Management (EM-50) for Technical Task Proposal RL4-6-WT-21.

  16. Summary of TFTR (Tokamak Fusion Test Reactor) diagnostics, including JET (Joint European Torus) and JT-60

    SciTech Connect (OSTI)

    Hill, K.W.; Young, K.M.; Johnson, L.C.

    1990-05-01

    The diagnostic instrumentation on TFTR (Tokamak Fusion Test Reactor) and the specific properties of each diagnostic, i.e., number of channels, time resolution, wavelength range, etc., are summarized in tables, grouped according to the plasma parameter measured. For comparison, the equivalent diagnostic capabilities of JET (Joint European Torus) and the Japanese large tokamak, JT-60, as of late 1987 are also listed in the tables. Extensive references are given to publications on each instrument.

  17. Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint

    SciTech Connect (OSTI)

    Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

    2012-03-01

    Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

  18. TANK 18 AND 19-F TIER 1A EQUIPMENT FILL MOCK UP TEST SUMMARY

    SciTech Connect (OSTI)

    Stefanko, D.; Langton, C.

    2011-11-04

    The United States Department of Energy (US DOE) has determined that Tanks 18-F and 19-F have met the F-Tank Farm (FTF) General Closure Plan Requirements and are ready to be permanently closed. The high-level waste (HLW) tanks have been isolated from FTF facilities. To complete operational closure they will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) discouraging future intrusion, and (4) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. Bulk waste removal and heel removal equipment remain in Tanks 18-F and 19-F. This equipment includes the Advance Design Mixer Pump (ADMP), transfer pumps, transfer jets, standard slurry mixer pumps, equipment-support masts, sampling masts, dip tube assemblies and robotic crawlers. The present Tank 18 and 19-F closure strategy is to grout the equipment in place and eliminate vertical pathways by filling voids in the equipment to vertical fast pathways and water infiltration. The mock-up tests described in this report were intended to address placement issues identified for grouting the equipment that will be left in Tank 18-F and Tank 19-F. The Tank 18-F and 19-F closure strategy document states that one of the Performance Assessment (PA) requirements for a closed tank is that equipment remaining in the tank be filled to the extent practical and that vertical flow paths 1 inch and larger be grouted. The specific objectives of the Tier 1A equipment grout mock-up testing include: (1) Identifying the most limiting equipment configurations with respect to internal void space filling; (2) Specifying and constructing initial test geometries and forms that represent scaled boundary conditions; (3) Identifying a target grout rheology for evaluation in the scaled mock-up configurations; (4) Scaling-up production of a grout mix with the target rheology

  19. A SUMMARY OF TEST OBSERVATIONS WHEN IBUTTONS ARE SUBJECTED TO RF ENERGY

    SciTech Connect (OSTI)

    Kane, R J; Baluyot, E V

    2011-10-26

    The iButton is a 'one-wire', temperature sensor and data logger in a short metal cylinder package 17 mm in diameter and 6 mm tall. The device is designed to be attached to a surface and acquire temperature samples over time periods as short as 1 second to as long as 300 minutes. Both 8-bit and 16-bit samples are available with 8kB of memory available. Lifetime is limited to an internal battery that cannot be replaced or recharged. The RF test interest originated with the concern that the data logger could inadvertently record electrical emanations from other nearby equipment. The normal operation of the data logger does not support high speed sampling but the control interface will operate at either 15.4 kbps or 125 kbps. There were no observable effects in the operation of the module or in the data that could be attributed to the use of RF energy. They made the assumption that these devices would potentially show RF sensitivity in any of the registers and in the data memory equally, therefore gross changes in the data might show RF susceptibility. No such sensitivity was observed. Because significant power levels were used for these tests they can extrapolate downward in power to state that no RF susceptibility would occur at lower power levels given the same configurations.

  20. Data summary report for fission product release test HI-1. [PWR; BWR

    SciTech Connect (OSTI)

    Osborne, M.F.; lorenz, R.A.; Travis, J.R.; Webster, C.S.

    1982-12-01

    This first in a series of high-temperature fission product release tests was conducted for 30 min at 1400/sup 0/C, with the release taking place into flowing steam. The fuel specimen was a 20-cm-long section of H.B. Robinson fuel rod, irradiated to 28,000 MWd per metric ton (t). After the test, the Zircaloy cladding of the specimen was almost completely oxidized and was quite fragile. The fission product collection system included a thermal gradient tube (700-150/sup 0/C), filters, heated charcoal, and cooled charcoal. Gamma ray analysis of apparatus components and collectors showed that about 2.83% of the /sup 85/Kr and 1.75% of the /sup 137/Cs were released from the fuel. Activation analysis of leach solutions from these components indicated that 2.04% of the /sup 129/I was released. Other analyses revealed small but significant releases of the radionuclides /sup 125/Sb and /sup 106/Ru, and of the elements Br, Rb, Sr, Zr, Ag, Sn, Te, Ba, and La.

  1. SUMMARY PLAN FOR BENCH-SCALE REFORMER AND PRODUCT TESTING TREATABILITY STUDIES USING HANFORD TANK WASTE

    SciTech Connect (OSTI)

    DUNCAN JB

    2010-08-19

    This paper describes the sample selection, sample preparation, environmental, and regulatory considerations for shipment of Hanford radioactive waste samples for treatability studies of the FBSR process at the Savannah River National Laboratory and the Pacific Northwest National Laboratory. The U.S. Department of Energy (DOE) Hanford tank farms contain approximately 57 million gallons of wastes, most of which originated during the reprocessing of spent nuclear fuel to produce plutonium for defense purposes. DOE intends to pre-treat the tank waste to separate the waste into a high level fraction, that will be vitrified and disposed of in a national repository as high-level waste (HLW), and a low-activity waste (LAW) fraction that will be immobilized for on-site disposal at Hanford. The Hanford Waste Treatment and Immobilization Plant (WTP) is the focal point for the treatment of Hanford tank waste. However, the WTP lacks the capacity to process all of the LAW within the regulatory required timeframe. Consequently, a supplemental LAW immobilization process will be required to immobilize the remainder of the LAW. One promising supplemental technology is Fluidized Bed Steam Reforming (FBSR) to produce a sodium-alumino-silicate (NAS) waste form. The NAS waste form is primarily composed of nepheline (NaAlSiO{sub 4}), sodalite (Nas[AlSiO{sub 4}]{sub 6}Cl{sub 2}), and nosean (Na{sub 8}[AlSiO{sub 4}]{sub 6}SO{sub 4}). Semivolatile anions such as pertechnetate (TcO{sub 4}{sup -}) and volatiles such as iodine as iodide (I{sup -}) are expected to be entrapped within the mineral structures, thereby immobilizing them (Janzen 2008). Results from preliminary performance tests using surrogates, suggests that the release of semivolatile radionuclides {sup 99}Tc and volatile {sup 129}I from granular NAS waste form is limited by Nosean solubility. The predicted release of {sup 99}Tc from the NAS waste form at a 100 meters down gradient well from the Integrated Disposal Facility (IDF

  2. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking (version2)

  3. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

  4. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

  5. ISSUANCE 2016-08-01: Energy Conservation Program: Corrction; Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  6. ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

  7. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

    Broader source: Energy.gov [DOE]

    Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

  8. ISSUANCE 2015-05-12: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

  9. ISSUANCE 2016-08-01: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  10. Test Summary Report INEEL Sodium-Bearing Waste Vitrification Demonstration RSM-01-1

    SciTech Connect (OSTI)

    Goles, Ronald W.; Perez, Joseph M.; Macisaac, Brett D.; Siemer, Darryl D.; Mccray, John A.

    2001-05-21

    The U.S. Department of Energy's Idaho National Engineering and Environmental Laboratory is storing large amounts of radioactive and mixed wastes. Most of the sodium-bearing wastes have been calcined, but about a million gallons remain uncalcined, and this waste does not meet current regulatory requirements for long-term storage and/or disposal. As a part of the Settlement Agreement between DOE and the State of Idaho, the tanks currently containing SBW are to be taken out of service by December 31, 2012, which requires removing and treatment the remaining SBW. Vitrification is the option for waste disposal that received the highest weighted score against the criteria used. Beginning in FY 2000, the INEEL high-level waste program embarked on a program for technology demonstration and development that would lead to conceptual design of a vitrification facility in the event that vitrification is the preferred alternative for SBW disposal. The Pacific Northwest National Laborator's Research-Scale Melter was used to conduct these initial melter-flowsheet evaluations. Efforts are underway to reduce the volume of waste vitrified, and during the current test, an overall SBW waste volume-reduction factor of 7.6 was achieved.

  11. Executive Summary: Executive Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Executive Summary - On the Path to SunShot Executive Summary - On the Path to SunShot The halfway mark of the SunShot Initiative's 2020 target date is a good time to take stock: How much progress has been made? What have we learned? What barriers and opportunities must still be addressed to ensure that solar technologies achieve cost parity in 2020 and realize their full potential in the decades beyond? To answer these questions, the Solar Energy Technology Office launched the On the Path to

  12. IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR® | Department of Energy IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® This October 30, 2008 webcast provided an overview of LM-80-08, Approved Method for Measuring Lumen Maintenance of LED Light Sources, and how DOE's ENERGY STAR program for Solid-State Lighting (SSL) Luminaires will use LM-80 to estimate lifetime for qualified SSL Luminaires. Richard

  13. Hunter DOE Ex Parte Communication Summary July 30 2015 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy DOE Ex Parte Communication Summary July 30 2015 Hunter DOE Ex Parte Communication Summary July 30 2015 This memo provides a summary of the communications made to the DOE staff regarding proposed rules on ceiling fan test procedures as well as proposed energy efficiency rules for ceiling fan light kits. July 30 2015 Hunter DOE Ex Parte Meeting (118.22 KB) More Documents & Publications ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits,

  14. Hanford 100-D Area Biostimulation Soluble Substrate Field Test: Interim Data Summary for the Substrate Injection and Process Monitoring Phases of the Field Test

    SciTech Connect (OSTI)

    Truex, Michael J.; Vermeul, Vincent R.; Mackley, Rob D.; Fritz, Brad G.; Mendoza, Donaldo P.; Johnson, Christian D.; Elmore, Rebecca P.; Brockman, Fred J.; Bilskis, Christina L.

    2008-06-01

    Pacific Northwest National Laboratory is conducting a treatability test designed to demonstrate that in situ biostimulation can be applied to help meet cleanup goals in the Hanford Site 100-D Area. The in situ biostimulation technology is intended to provide supplemental treatment upgradient of the In Situ Redox Manipulation (ISRM) barrier by reducing the concentration of the primary oxidizing species in groundwater (i.e., nitrate and dissolved oxygen) and chromate, and thereby increasing the longevity of the ISRM barrier. This report summarizes the initial results from field testing of an in situ biological treatment zone implemented through injection of a soluble substrate. The field test is divided into operational phases that include substrate injection, process monitoring, and performance monitoring. The results summarized herein are for the substrate injection and process monitoring phase encompassing the first approximately three months of field testing. Performance monitoring is ongoing at the time this report was prepared and is planned to extend over approximately 18 months. As such, this report is an interim data summary report for the field test. The treatability testing has multiple objectives focused on evaluating the performance of biostimulation as a reducing barrier for nitrate, oxygen, and chromate. The following conclusions related to these objectives are supported by the data provided in this report. Substrate was successfully distributed to a radius of about 15 m (50 ft) from the injection well. Monitoring data indicate that microbial growth initiated rapidly, and this rapid growth would limit the ability to inject substrate to significantly larger zones from a single injection well. As would be expected, the uniformity of substrate distribution was impacted by subsurface heterogeneity. However, subsequent microbial activity and ability to reduce the targeted species was observed throughout the monitored zone during the process monitoring

  15. Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint

    SciTech Connect (OSTI)

    Rugh, J.

    2010-02-01

    A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

  16. Test procedure for use of the shear vane in tanks 103-SY, 103-AN, and 103-AW

    SciTech Connect (OSTI)

    LeClair, M.D.; Waters, E.

    1995-01-01

    This is a record copy of a test procedure for application of the full-scale shear vane to underground waste tanks at Hanford. The introduction of the report provides background information on the development and proof-testing of the shear vane, as well as information about its current location. The document was originally prepared in 1988, and the work as shelved temporarily for lack of funds. Activities to utilize the shear vane will be expedited by use of this information.

  17. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect (OSTI)

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  18. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect (OSTI)

    Judkoff, Ron

    2010-08-01

    This report documents the initial Phase 1 test process for testing the reliability of software models that predict retrofit energy savings of existing homes, including their associated calibration methods.

  19. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  20. ISSUANCE 2015-06-25: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  2. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  3. Accuracy of the European solar water heater test procedure. Part 2: Prediction of long-term performance

    SciTech Connect (OSTI)

    Rabl, A. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    This paper continues the evaluation of the European test procedure for solar water heaters, by considering what consequences the errors of the parameters (derived in Part 1, the companion paper) will have for the prediction of the long-term performance. A simple criterion is derived for the required length of the test period, as a function of climatic variables and desired accuracy of the long-term performance prediction. Typically a duration of 10 to 50 days will suffice. Since the actual conditions during a test cannot be foreseen, it will be more efficient to calculate the error of the long-term performance prediction on line at the end of each test day and terminate the series whenever acceptable accuracy is reached.

  4. Executive Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Summary September 2015 Quadrennial Technology Review ES Executive Summary ES Executive Summary Introduction The United States is in the midst of an energy revolution. Over the last decade, the United States has slashed net petroleum imports, dramatically increased shale gas production, scaled up wind and solar power, and cut the growth in electricity consumption to nearly zero through widespread efficiency measures. Emerging advanced energy technologies provide a rich set of options to

  5. A rating procedure for solar domestic hot water systems based on ASHRAE-95 test results

    SciTech Connect (OSTI)

    Minnerly, B.V.; Klein, S.A.; Beckman, W.A. )

    1991-01-01

    A rating method for solar domestic hot water (SDHW) systems is presented that provides site-specific annual performance estimates based on ASHRAE-95 test results. An overall loss and overall gain coefficient are estimated by lumping the entire thermal behavior of the actual system exhibited during the ASHRAE-95 test into the collector parameters of a simplified system model. The performance of the simplified model can then be predicted using either the F-chart or TRNSYS and presented as an estimate of the annual performance of the actual system. Experimental performance measurements taken from relevant literature as well as extensive simulations, indicate that this method is capable of predicting the annual performance of a wide range of SDHW system types to within 5%, independent of location.

  6. 2014-10-14 Issuance: Test Procedures and Energy Conservation Standards for Residential Solar Water Heaters; Request for Information

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  7. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplemental Notice of Proposed Rulemaking regarding Test Procedures for Integrated Light-Emitting Diode Lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  8. 2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  9. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  10. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect (OSTI)

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  11. Evaluation of melter technologies for vitrification of Hanford site low-level tank waste - phase 1 testing summary report

    SciTech Connect (OSTI)

    Wilson, C.N., Westinghouse Hanford

    1996-06-27

    Following negotiation of the fourth amendment to the Tri- Party Agreement for Hanford Site cleanup, commercially available melter technologies were tested during 1994 and 1995 for vitrification of the low-level waste (LLW) stream to be derived from retrieval and pretreatment of the radioactive defense wastes stored in 177 underground tanks. Seven vendors were selected for Phase 1 testing to demonstrate vitrification of a high-sodium content liquid LLW simulant. The tested melter technologies included four Joule-heated melters, a carbon electrode melter, a combustion melter, and a plasma melter. Various dry and slurry melter feed preparation processes also were tested. The technologies and Phase 1 testing results were evaluated and a preliminary technology down-selection completed. This report describes the Phase 1 LLW melter vendor testing and the tested technologies, and summarizes the testing results and the preliminary technology recommendations.

  12. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    summary written by Raven Hanna New rock formed by deep undersea volcanoes does not stay bare long. Microbes quickly move onto these basalts to form communities in the form of...

  13. SUMMARY REPORT

    Energy Savers [EERE]

    SUMMARY REPORT Department of Energy's Implementation of Selected Controls as Defined in the Cybersecurity Act of 2015 DOE-OIG-16-14 August 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 August 4, 2016 MEMORANDUM FOR THE SECRETARY FROM: Rickey R. Hass Acting Inspector General SUBJECT: INFORMATION: Summary Report on the "Department of Energy's Implementation of Selected Controls as Defined in the

  14. Program Summaries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Summaries Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) Community Resources Program Summaries Brochures Reports Accomplishments Presentations BES and Congress Science for Energy Flow Seeing Matter Nano for Energy Scale of Things Chart Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington,

  15. 2014-03-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for packaged terminal air conditioners and packaged terminal heat pumps, as issued by the Deputy Assistant Secretary on March 6, 2014.

  16. Summary of activities at the Engineered Barriers Test Facility, October 1, 1995 to January 31, 1997, and initial data

    SciTech Connect (OSTI)

    Porro, I.; Keck, K.N.

    1997-03-01

    Replicates of two engineered barrier designs (a thick soil barrier and a bio/capillary barrier) were constructed in the test plots of the facility. Prior to placement of any soil in the test plots, instruments were calibrated and attached to plot instrument towers, which were then installed in the test plots. Soil from Spreading Area B was installed in the test plots in lifts and compacted. Instruments attached to the instrument tower were placed in shallow trenches dug in the lifts and buried. Each instrument was checked to make sure it functioned prior to installation of the next lift. Soil samples were collected from each lift in one plot during construction for later determination of physical and hydraulic properties. After completion of the test plots, the data acquisition system was finalized, and data collection began. Appropriate instrument calibration equations and equation coefficients are presented, and data reduction techniques are described. Initial data show test plot soils drying throughout the summer and early fall. This corresponds to low rainfall during this period. Infiltration of water into the test plots was first detected around mid-November with several subsequent episodes in December. Infiltration was verified by corresponding measurements from several different instruments [time domain reflectometry (TDR), neutron probe, thermocouple psychrometers, and heat dissipation sensors]. Tensiometer data does not appear to corroborate data from the other instruments. Test plots were warmer on the side closest to the access trench indicating a temperature effect from the trench. This resulted in greater soil moisture freezing with less and shallower infiltration on the far side of the plots than on the side closest to the trench. At the end of this monitoring period, infiltration in all but two of the test plots has reached the 155-cm depth. Infiltration in test plots B2 and S3 has reached only the 140-cm depth. The monitored infiltration events have

  17. A Discussion of Procedures and Equipment for the Comprehensive Test Ban Treaty On-Site Inspection Environmental Sampling and Analysis

    SciTech Connect (OSTI)

    Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.; Seifert, Carolyn E.; Friese, Judah I.; Miley, Harry S.; Bowyer, Ted W.; Hanlen, Richard C.; Onishi, Yasuo; Hayes, James C.; Wigmosta, Mark S.

    2011-02-01

    This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of the sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.

  18. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of chromium-nickel steel to nickel-copper

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2602-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of 300 series Cr-Ni steels (P-8-1) to nickel-copper N04400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  19. Welding procedure specification: gas tungsten arc welding of nickel-copper to nickel-chromium-iron. Supplement 1. Records of procedure qualification tests

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2303-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper N04400 (P-42) to nickel-chromium-iron N06600 (P-43), in thickness range of 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  20. Summary and assessment of METC zinc ferrite hot coal gas desulfurization test program, final report: Volume 1

    SciTech Connect (OSTI)

    Underkoffler, V.S.

    1986-12-01

    The Morgantown Energy Technology Center (METC) has conducted a test program to develop a zinc ferrite-based high temperature desulfurization process which could be applied to fuel gas entering downstream components such as molten carbonate fuel cells or gas turbines. As a result of prior METC work with iron oxide and zinc oxide sorbents, zinc ferrite evolved as a candidate with the potential for high capacity, low equilibrium levels of H/sub 2/S, and structural stability after multiple regenerations. The program consisted of laboratory-scale testing with a two-inch diameter reactor and simulated fixed-bed gasifier gas; bench-scale testing with a six-inch diameter reactor and actual gas from the METC 42-inch fixed bed gasifier; as well as laboratory-scale testing of zinc ferrite with simulated fluidized bed gasifier gas. Optimum operating parameters for zinc ferrite such as temperatures, gas compositions, and space velocities are discussed. From the test results, salient features of zinc ferrite were derived and discussed in regard to system implications, issues raised, and technical requirements. 47 refs., 53 figs., 41 tabs.

  1. Advanced Vehicle Testing Activity: Low-Percentage Hydrogen/CNG Blend Ford F-150 Operating Summary - January 2003

    SciTech Connect (OSTI)

    Karner, D.; Francfort, J.E.

    2003-01-22

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy's Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service's Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended hydrogen fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents results of 16,942 miles of testing for one of the blended fuel vehicles, a Ford F-150 pickup truck, operating on up to 30% hydrogen/70% CNG fuel.

  2. Advanced Vehicle Testing Activity: High-Percentage Hydrogen/CNG Blend Ford F-150 Operating Summary - January 2003

    SciTech Connect (OSTI)

    Karner, D.; Francfort, J.E.

    2003-01-22

    Over the past two years, Arizona Public Service, a subsidiary of Pinnacle West Capital Corporation, in cooperation with the U.S. Department of Energy's Advanced Vehicle Testing Activity, tested four gaseous fuel vehicles as part of its alternative fueled vehicle fleet. One vehicle operated initially using compressed natural gas (CNG) and later a blend of CNG and hydrogen. Of the other three vehicles, one was fueled with pure hydrogen and two were fueled with a blend of CNG and hydrogen. The three blended-fuel vehicles were originally equipped with either factory CNG engines or factory gasoline engines that were converted to run CNG fuel. The vehicles were variously modified to operate on blended fuel and were tested using 15 to 50% blends of hydrogen (by volume). The pure-hydrogen-fueled vehicle was converted from gasoline fuel to operate on 100% hydrogen. All vehicles were fueled from the Arizona Public Service's Alternative Fuel Pilot Plant, which was developed to dispense gaseous fuels, including CNG, blends of CNG and hydrogen, and pure hydrogen with up to 99.9999% purity. The primary objective of the test was to evaluate the safety and reliability of operating vehicles on hydrogen and blended fuel, and the interface between the vehicles and the hydrogen fueling infrastructure. A secondary objective was to quantify vehicle emissions, cost, and performance. Over a total of 40,000 fleet test miles, no safety issues were found. Also, significant reductions in emissions were achieved by adding hydrogen to the fuel. This report presents the results of 4,695 miles of testing for one of the blended fuel vehicles, a Ford F-150 pickup truck, operating on up to 50% hydrogen-50% CNG fuel.

  3. 2008 Annual Merit Review Results Summary - 2. Applied Battery...

    Broader source: Energy.gov (indexed) [DOE]

    Review Results Summary - 3. Battery Development, Testing, Simulation, Analysis 2008 Annual Merit Review Results Summary - 4. Exploratory Battery Research 2011 Annual Merit ...

  4. 2006 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

    SciTech Connect (OSTI)

    Gregory J, Shott, Vefa Yucel

    2007-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2006) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, with the results submitted as an annual summary report to the U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 2000; 2002). The DOE, National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2006 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs results. This annual summary report presents data and conclusions from the FY 2006 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, and closure plans, as well as monitoring results and research and development (R&D) activities, were reviewed in FY 2006 for determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed for determination of the adequacy of the CAs.

  5. 2004 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada

    SciTech Connect (OSTI)

    Vefa Yucel

    2005-01-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (Bechtel Nevada, 2000) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, and reports the results in an annual summary report to the U.S. Department of Energy Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (U.S. Department of Energy [DOE]). The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2004 by evaluating operational factors and research results that impact the continuing validity of the PA and CA results. This annual summary report presents data and conclusions from the FY 2004 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, closure plans, as well as monitoring results and research and development (R&D) activities were reviewed in FY 2004 for the determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed for the determination of the adequacy of the CAs.

  6. Inspection of Environment, Safety, and Health and Emergency Management at the Nevada Test Site- Summary Report, October 2002

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the National Nuclear Security Administration (NNSA) Nevada Test Site (NTS) in September and October

  7. Summary of hydrogeologic controls on ground-water flow at the Nevada Test Site, Nye County, Nevada

    SciTech Connect (OSTI)

    Laczniak, R.J.; Cole, J.C.; Sawyer, D.A.; Trudeau, D.A.

    1996-07-01

    The underground testing of nuclear devices has generated substantial volumes of radioactive and other chemical contaminants below ground at the Nevada Test Site (NTS). Many of the more radioactive contaminants are highly toxic and are known to persist in the environment for thousands of years. In response to concerns about potential health hazards, the US Department of Energy, under its Environmental Restoration Program, has made NTS the subject of a long-term investigation. Efforts will assess whether byproducts of underground testing pose a potential hazard to the health and safety of the public and, if necessary, will evaluate and implement steps to remediate any of the identified dangers. Ground-water flow is the primary mechanism by which contaminants can be transported significant distances away from the initial point of injection. Flow paths between contaminant sources and potential receptors are separated by remote areas that span tens of miles. The diversity and structural complexity of the rocks along these flow paths complicates the hydrology of the region. Although the hydrology has been studied in some detail, much still remains uncertain about flow rates and directions through the fractured-rock aquifers that transmit water great distances across this arid region. Unique to the hydrology of NTS are the effects of underground testing, which severely alter local rock characteristics and affect hydrologic conditions throughout the region. This report summarizes what is known and inferred about ground-water flow throughout the NTS region. The report identifies and updates what is known about some of the major controls on ground-water flow, highlights some of the uncertainties in the current understanding, and prioritizes some of the technical needs as related to the Environmental Restoration Program. 113 refs.

  8. Evaluation of Flygt Mixers for Application in Savannah River Site Tank Summary of Test Results from Phase A, B, and C Testing

    SciTech Connect (OSTI)

    BK Hatchell; H Gladki; JR Farmer; MA Johnson; MR Poirier; MR Powell; PO Rodwell

    1999-10-21

    Staff from the Savannah River Site (SRS), Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), and ITT Flygt Corporation in Trumbull, Connecticut, are conducting a joint mixer testing program to evaluate the applicability of Flygt mixers to SRS Tank 19 waste retrieval and waste retrieval in other U.S. Department of Energy (DOE) tanks. This report provides the results of the Phase C Flygt mixer testing and summarizes the key findings from the Phase A and B tests. Phase C Flygt mixer testing used full-scale, Model 4680 Flygt mixers (37 kW, 51-cm propeller) installed in a fall-scale tank (25.9-m diameter) at SRS. Phase A testing used a 0.45-m tank and Flygt mixers with 7.8-cm diameter propellers. Phase B testing used Model 4640 Flygt mixers (3 kW, 37-cm propeller) installed in 1.8-m and 5.7-m tanks. Powell et al. (1999z4 1999b) provide detailed descriptions of the Phase A and B tests. In Phase C, stationary submerged jet mixers manufactured by ITT Flygt Corporation were tested in the 25.9-m diameter tank at the SRS TNX facility. The Model 4680 mixers used in Phase C have 37-kW (50-hp) electric motors that drive 51-cm (20-in.) diameter propellers at 860 rpm. Fluid velocity was measured at selected locations with as many as four Model 4680 mixers operating simultaneously in the 25.9-m tank, which was filled with water to selected levels. Phase C involved no solids suspension or sludge mobilization tests.

  9. Summary of Conclusions and Recommendations Drawn from the DeepCWind Scaled Floating Offshore Wind System Test Campaign: Preprint

    SciTech Connect (OSTI)

    Robertson, A. N.; Jonkman, J. M.; Masciola, M. D.; Molta, P.; Goupee, A. J.; Coulling, A. J.; Prowell, I.; Browning, J.

    2013-07-01

    The DeepCwind consortium is a group of universities, national labs, and companies funded under a research initiative by the U.S. Department of Energy (DOE) to support the research and development of floating offshore wind power. The two main objectives of the project are to better understand the complex dynamic behavior of floating offshore wind systems and to create experimental data for use in validating the tools used in modeling these systems. In support of these objectives, the DeepCwind consortium conducted a model test campaign in 2011 of three generic floating wind systems, a tension-leg platform (TLP), a spar-buoy (spar), and a semisubmersible (semi). Each of the three platforms was designed to support a 1/50th-scale model of a 5 MW wind turbine and was tested under a variety of wind/wave conditions. The focus of this paper is to summarize the work done by consortium members in analyzing the data obtained from the test campaign and its use for validating the offshore wind modeling tool, FAST.

  10. EXECUTIVE SUMMARY

    National Nuclear Security Administration (NNSA)

    FUSION ENERGY SCIENCE ADVISORY COMMITTEE Panel on High Energy Density Laboratory Plasmas ADVANCING THE SCIENCE OF HIGH ENERGY DENSITY LABORATORY PLASMAS January 2009 UNITED STATES DEPARTMENT OF ENERGY 1 TABLE OF CONTENTS EXECUTIVE SUMMARY.......................................................................................... 5 1 HIGH ENERGY DENSITY LABORATORY PLASMA SCIENCE .................................... 15 2 THE CHARGE TO FESAC

  11. Hanford Waste Vitrification Program process development: Melt testing subtask, pilot-scale ceramic melter experiment, run summary

    SciTech Connect (OSTI)

    Nakaoka, R.K.; Bates, S.O.; Elmore, M.R.; Goles, R.W.; Perez, J.M.; Scott, P.A.; Westsik, J.H.

    1996-03-01

    Hanford Waste Vitrification Program (HWVP) activities for FY 1985 have included engineering and pilot-scale melter experiments HWVP-11/HBCM-85-1 and HWVP-12/PSCM-22. Major objectives designated by HWVP fo these tests were to evaluate the processing characteristics of the current HWVP melter feed during actual melter operation and establish the product quality of HW-39 borosilicate glass. The current melter feed, defined during FY 85, consists of reference feed (HWVP-RF) and glass-forming chemicals added as frit.

  12. 2008 Annual Merit Review Results Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    08 Annual Merit Review Results Summary 2008 Annual Merit Review Results Summary DOE Vehicle Technologies Annual Merit Review 2008_merit_review.pdf (22.4 MB) More Documents & Publications 2008 Annual Merit Review Results Summary - 3. Battery Development, Testing, Simulation, Analysis 2008 Annual Merit Review Results Summary - 1. Plenary Session 2008 Annual Merit Review Results Summary - 2. Applied Battery Research

  13. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-A: Resource description, program history, wells tested, university and company based research, site restoration

    SciTech Connect (OSTI)

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Geopressured-geothermal resource description; Resource origin and sediment type; Gulf Coast resource extent; Resource estimates; Project history; Authorizing legislation; Program objectives; Perceived constraints; Program activities and structure; Well testing; Program management; Program cost summary; Funding history; Resource characterization; Wells of opportunity; Edna Delcambre No. 1 well; Edna Delcambre well recompletion; Fairfax Foster Sutter No. 2 well; Beulah Simon No. 2 well; P.E. Girouard No. 1 well; Prairie Canal No. 1 well; Crown Zellerbach No. 2 well; Alice C. Plantation No. 2 well; Tenneco Fee N No. 1 well; Pauline Kraft No. 1 well; Saldana well No. 2; G.M. Koelemay well No. 1; Willis Hulin No. 1 well; Investigations of other wells of opportunity; Clovis A. Kennedy No. 1 well; Watkins-Miller No. 1 well; Lucien J. Richard et al No. 1 well; and the C and K-Frank A. Godchaux, III, well No. 1.

  14. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE`s goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT and E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD`s RDDT and E.

  15. Usage Summaries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Usage Summaries PDSF Group Batch Summary Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2016 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 Partial SGE62 2015 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 2014 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 2013 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 2012 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62 SGE62

  16. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    archaeopteryx » Links Scientific Highlight SLAC Press Release BBC News » Share this Article Laboratree Ologeez SciLink LabSpaces Archaeopteryx Feathers and Bone Chemistry Fully Revealed via Synchrotron Imaging summary written by Raven Hanna Archaeopteryx, the half-reptilian, half-avian creature that lived 150 million years ago is famous as the fossil record's link between dinosaurs and birds. The discovery of the first Archaeopteryx fossil, which coincided with the publication of Charles

  17. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 image Outside view of the T=4 subunit arrangement. » Links Scientific Highlight Johnson Lab » Share this Article Laboratree Ologeez SciLink LabSpaces Following the pH-dependent Conformational Changes of a Maturing Viral Capsid summary written by Raven Hanna The capsid that surrounds viruses is formed from subunit proteins that interact in specific ways to form a tight shell. The processes of coming together and forming interactions are multistep and complex and are fundamental events to

  18. PROJECT SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECT SUMMARY 1 TITLE Advancing Synchrophasor Applications and Training through Academic-Industry Collaborations 2 PRINCIPLE INVESTIGATORS University of Wyoming: Dongliang Duan (PI), John Pierre, Suresh Muknahallipatna (co-PIs) Colorado State University: Liuqing Yang, Louis L. Scharf (co-PIs) Montana Tech of the University of Montana: Daniel Trudnowski, Matthew Donnelly (co-PIs) 3 CONTACT INFORMATION Dongliang Duan Dept. 3295, 1000 E. University Ave. Laramie, WY 82070 Tel: (307)766-6541; Fax:

  19. EFRC Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Frontier Research Center Alex Zunger (NREL) Summary statement: We will focus on material discovery via an "Inverse Band Structure" (IBS) methodology to theoretically identify promising structures and compositions and then apply a combination of high-throughput and targeted materials synthesis to experimentally converge on the optimum properties. RESEARCH PLAN AND DIRECTIONS Rather than use the conventional approach "given the structure, find the electronic properties,"

  20. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kohen Research UI News Release SSRL Macromolecular Crystallography » Share this Article Laboratree Ologeez SciLink LabSpaces Novel Mechanism for DNA Biosynthesis in Organisms with Gene thyX could Lead to Better Antibiotics summary written by Raven Hanna Before DNA is made, the subunits composing DNA must be made. The essential process of making one of these subunits, thymidine monophosphate (TMP), was thought to be similar for most living things, but scientists recently discovered that some

  1. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hasan Research Princeton News Release » Share this Article Laboratree Ologeez SciLink LabSpaces Macroscopic Quantum Insulator State Observed summary written by Raven Hanna One of the strangest consequences of quantum mechanics is the seemingly instantaneous communication of subatomic particles over long distances. Known as quantum entanglement, pairs or groups of particles can become linked so that any changes made to one will cause the others to respond quicker than the time it takes for light

  2. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    03, 2008 » Links Scientific Highlight Tainer Website Scripps Press Release » Share this Article Laboratree Ologeez SciLink LabSpaces Role of Specific Protein Mutations in Causing Human Disease Revealed summary written by Brad Plummer, SLAC Communication Office Scientists are one step closer to understanding a piece of the machinery involved in DNA transcription and repair, thanks to work done in part at the SSRL macromolecular crystallography Beam Line 11-1. The team, led by The Scripps

  3. Office of Technology Development FY 1993 program summary: Office of Research and Development, Office of Demonstration, Testing and Evaluation. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs are discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.

  4. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fe-s image » Links Scientific Highlight Peters Lab MSU News e! Science News Physorg.com » Share this Article Laboratree Ologeez SciLink LabSpaces The Structure of an Algal Hydrogenase Reveals the Assembly and Evolution of Complex Metalloenzymes summary written by Raven Hanna The potential for using biological enzymes to make hydrogen to use as a renewable energy source is a hot topic, but little is known about how these complex enzymes assemble and work. The [FeFe]-hydrogenase enzyme binds

  5. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    image M.F. Toney, A. Nilsson & H. Ogasawara (Image courtesy of K. Tuttle) » Links Nilsson Research SLAC Press Release » Share this Article Laboratree Ologeez SciLink LabSpaces Reducing Fuel Cell Costs by Changing the Structure and Reactivity of Platinum summary written by Raven Hanna Hydrogen fuel cells are a green alternative to fossil fuels for powering vehicles, since the byproduct of fuel cell energy production is simply water. A problem with using fuel cells is their high cost,

  6. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    H1N1 Flu » Links Scientific Highlight Wilson Lab Scripps Press Release Scripps Philanthrophy Science Magazine Vanderbilt Reporter » Share this Article Laboratree Ologeez SciLink LabSpaces Structural Basis for Senior Immunity to the Current H1N1 Flu summary written by Raven Hanna An unusual property of the last year's H1N1 "swine flu" virus pandemic is that it disproportionately affected the young. People over the age of around 65 showed much less vulnerability than to more typical

  7. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hg Methylation » Links Scientific Highlight BL2-3 BL6-2C BL9-3 BL10-2 » Share this Article Laboratree Ologeez SciLink LabSpaces Imaging Mercury in the Rhizosphere of Wetland Plants summary written by Raven Hanna High levels of mercury in our diets can have adverse effects on our health, and fish are a major source of dietary mercury. Because of a process called biomagnification, mercury levels in fish can build up to be at a much higher concentration than in the surrounding water. The mercury

  8. Chair Summaries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chair Summaries from the 2006 Innovative Confinement Concepts (ICC) Workshop D. Craig, 1 R. Goldston, 2 T. R. Jarboe, 3 B. A. Nelson, 3 C. R. Sovinec, 1 S. Woodruff, 3, *and G. Wurden 4 The goal of the ICC program within the DOE Office of Fusion Energy Sciences (OFES) is to improve magnetic and inertial fusion concepts and to advance plasma science. ICC2006 is a continuation of the ICC series, which last year met in Madison, Wisconsin. It provides a forum for an exchange of ideas through

  9. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    25, 2008 » Links Scientific Highlight Saphire Website Scripps Press Release Tracking Ebola, Scripps At the Forefront » Share this Article Laboratree Ologeez SciLink LabSpaces Revealing a Structural Weakness of the Deadly Ebolavirus summary written by Brad Plummer, SLAC Communication Office Scientists are one step closer to conquering the deadly Ebolavirus, thanks to research conducted at SSRL structural biology Beam Lines 9-2 and 11-1 and ALS Beam Line 5.02 by a team of researchers led by

  10. Science Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chang Research Scripps News Release » Share this Article Laboratree Ologeez SciLink LabSpaces Finding the Crystal Structure of P-gp: A Protein that Makes Cancer Cells Resistant to Chemotherapy summary written by Raven Hanna Medications can be rendered ineffective through cells developing multidrug resistance. This is the case in many forms of cancer cells that fail to respond to chemotherapy. The ability of these cells to avoid the effects of drugs can be due to the actions of P-glycoprotein

  11. Savannah River Site Settlement Agreement, August 26, 1991 Summary

    Office of Environmental Management (EM)

    91-51-SW State South Carolina Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope Summary Establish procedures and guidelines for F listed solvent contaminated rag ...

  12. 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding alternative efficiency determination methods and test procedures for walk-in coolers and walk-in freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  13. Trinity Acceptance Tests Performance Summary.

    SciTech Connect (OSTI)

    Rajan, Mahesh

    2015-12-01

    Ensuring Real Applications perform well on Trinity is key to success. Four components: ASC applications, Sustained System Performance (SSP), Extra-Large MiniApplications problems, and Micro-benchmarks.

  14. Operating Experience Summary, 2015-01

    Energy Savers [EERE]

    1 September 16, 2015 Inside This Issue * Explosion at the Nonproliferation Test and Evaluation Complex ... 1 Page 1 of 8 Operating Experience Summary Office of Environment,...

  15. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

  16. ISSUANCE 2015-06-30: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

  17. ISSUANCE 2014-12-23: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

  18. ISSUANCE 2015-03-27: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

  19. Nevada Test Site closure program

    SciTech Connect (OSTI)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use.

  20. STEP Financial Incentives Summary

    Office of Energy Efficiency and Renewable Energy (EERE)

    STEP Financial Incentives Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  1. BETTER BUILDINGS PARTNER SUMMARIES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Michigan - SEP Summary Evaluation Missouri Summary Nevada - SEP Summary Evaluation New Hampshire Summary Evaluation New York Summary Omaha, Nebraska Summary Philadelphia, ...

  2. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect (OSTI)

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  3. 2008 Annual Merit Review Results Summary - 3. Battery Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3. Battery Development, Testing, Simulation, Analysis 2008 Annual Merit Review Results Summary - 3. Battery Development, Testing, Simulation, Analysis DOE Vehicle Technologies ...

  4. 2014-05-05 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding alternative efficiency determination methods and test procedures for walk-in coolers and walk-in freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  5. Microsoft Word - FINAL_RAP_March08_summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 2008 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING March 12, 2008 Richland, WA Topics in this Meeting Summary Welcome and Introductions ................................................................................................ 1 Information Management .................................................................................................... 1 Deep Vadose Zone Treatability Test Plan

  6. Operability test report for rotary mode core sampling system number 3

    SciTech Connect (OSTI)

    Corbett, J.E.

    1996-03-01

    This report documents the successful completion of operability testing for the Rotary Mode Core Sampling (RMCS) system {number_sign}3. The Report includes the test procedure (WHC-SD-WM-OTP-174), exception resolutions, data sheets, and a test report summary.

  7. TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM

    SciTech Connect (OSTI)

    WYRWAS RB; PAGE JS; COOKE GS

    2012-04-19

    This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

  8. Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test

    SciTech Connect (OSTI)

    Wang, Jy-An John; Tan, Ting; Jiang, Hao; Zhang, Wei; Feng, Zhili

    2012-10-01

    The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

  9. Test procedures and protocols: Their relevance to the figure of merit for thermal distribution systems. Volume 1: Informal report

    SciTech Connect (OSTI)

    Andrews, J.W.

    1993-09-01

    A conceptual framework is developed that categorizes measurement protocols for forced-air thermal distribution systems in small buildings. This framework is based on the distinction between two generic approaches. The {open_quote}system-comparison{close_quote} approach seeks to determine, via a pair of whole-house energy-use measurements, the difference in energy use between the house with the as-found duct system and the same house with no energy losses attributable to the thermal distribution system. The {open_quote}component loss-factor{close_quote} approach identifies and measures the individual causes of duct losses, and then builds up a value for the net overall duct efficiency, usually with the help of computer simulation. Examples of each approach are analyzed and related to a proposed Figure of Merit for thermal distribution systems. This Figure of Merit would serve as the basis for a Standard Method of Test analogous to those already in place for furnaces, boilers, air conditioners, and heat pumps.

  10. Microwave power coupler for a superconducting multiple-cell cavity for accelerator application and its testing procedures

    SciTech Connect (OSTI)

    Li, Jianjian

    2008-12-01

    Superconducting cavity resonators offer the advantage of high field intensity for a given input power, making them an attractive contender for particle accelerator applications. Power coupling into a superconducting cavity employed in a particle accelerator requires unique provisions to maintain high vacuum and cryogenic temperature on the cavity side, while operating with ambient conditions on the source side. Components introduced to fulfill mechanical requirements must show negligible obstruction of the propagation of the microwave with absence of critical locations that may give rise to electron multipaction, leading to a multiple section design, instead of an aperture, a probe, or a loop structure as found in conventional cavities. A coaxial power coupler for a superconducting multiple-cell cavity at 3.9 GHz has been developed. The cavity is intended to be employed as an accelerator to provide enhanced electron beam quality in a free-electron laser in Hamburg (FLASH) user facility. The design of the coupler called for two windows to sustain high vacuum in the cavity and two bellows to accommodate mechanical dimensional changes resulting from cryogenics. Suppression of multipacting was accomplished by the choice of conductor dimensions and materials with low second yield coefficients. Prior to integration with the cavity, the coupler was tested for intrinsic properties in a back-to-back configuration and conditioned for high-power operation with increasing power input. Maximum incident power was measured to be 61 kW. When integrated with the superconducting cavity, a loaded quality factor of 9 x 10 5 was measured by transient method. Coupler return loss and insertion loss were estimated to be around -21 dB and -0.2 dB, respectively.

  11. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs

    SciTech Connect (OSTI)

    Fridley, David; Zheng, Nina; Zhou, Nan

    2010-06-01

    Since the late 1970s, energy labeling programs and mandatory energy performance standards have been used in many different countries to improve the efficiency levels of major residential and commercial equipment. As more countries and regions launch programs covering a greater range of products that are traded worldwide, greater attention has been given to harmonizing the specific efficiency criteria in these programs and the test methods for measurements. For example, an international compact fluorescent light (CFL) harmonization initiative was launched in 2006 to focus on collaboration between Australia, China, Europe and North America. Given the long history of standards and labeling programs, most major energy-consuming residential appliances and commercial equipment are already covered under minimum energy performance standards (MEPS) and/or energy labels. For these products, such as clothes washers and CFLs, harmonization may still be possible when national MEPS or labeling thresholds are revised. Greater opportunity for harmonization exists in newer energy-consuming products that are not commonly regulated but are under consideration for new standards and labeling programs. This may include commercial products such as water dispensers and vending machines, which are only covered by MEPS or energy labels in a few countries or regions. As China continues to expand its appliance standards and labeling programs and revise existing standards and labels, it is important to learn from recent international experiences with efficiency criteria and test procedures for the same products. Specifically, various types of standards and labeling programs already exist in North America, Europe and throughout Asia for products in China's 2010 standards and labeling programs, namely clothes washers, water dispensers, vending machines and CFLs. This report thus examines similarities and critical differences in energy efficiency values, test procedure specifications and other

  12. Albuquerque Roundtable Summary

    Broader source: Energy.gov [DOE]

    Summary from the DOE Office of Indian Energy roundtable session on April 6, 2011, in Albuquerque, New Mexico.

  13. Las Vegas Roundtable Summary

    Broader source: Energy.gov [DOE]

    Summary report from the DOE Office of Indian Energy roundtable held on March 16, 2011, in Las Vegas, Nevada.

  14. DRAFT MEETING SUMMARY (v

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the Whole Meeting Page 1 Final Meeting Summary May 12, 2010 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD COMMITTEE OF THE WHOLE May 12, 2010 Richland, WA Topics in this Meeting Summary Welcome and Introductions ................................................................................................ 1 Overview of the Proposed Changes .................................................................................... 1 Central Plateau - Specific Issues

  15. ISSUANCE 2016-03-10: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Broader source: Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  16. ISSUANCE 2016-04-14: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  17. Emergency Procedures

    Broader source: Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  18. Laboratory testing for enhanced undersea cable survivability

    SciTech Connect (OSTI)

    Stange, W.F.

    1983-01-01

    Examples of useful testing procedures with summaries of test results gleaned from years of cable testing experience illustrate how laboratory testing has identified failure modes, uncovered design deficiencies, characterized performance and supported system design for improved at-sea survivability. Repeated test results give insight into the performance capabilities and limitations of contemporary cables with metal and aramid strength members and demonstrate that successful at-sea performance invariably depends upon the effective mating of cable, attachment hardware and handling equipment. Analysis of the potentially high cost of cable failure at sea clearly demonstrates that it pays to test in the laboratory.

  19. Product consistency test and toxicity characteristic leaching procedure results of the ceramic waste form from the electrometallurgical treatment process for spent fuel

    SciTech Connect (OSTI)

    Johnson, S. G.; Adamic, M. L.: DiSanto, T.; Warren, A. R.; Cummings, D. G.; Foulkrod, L.; Goff, K. M.

    1999-11-11

    The ceramic waste form produced from the electrometallurgical treatment of sodium bonded spent fuel from the Experimental Breeder Reactor-II was tested using two immersion tests with separate and distinct purposes. The product consistency test is used to assess the consistency of the waste forms produced and thus is an indicator of a well-controlled process. The toxicity characteristic leaching procedure is used to determine whether a substance is to be considered hazardous by the Environmental Protection Agency. The proposed high level waste repository will not be licensed to receive hazardous waste, thus any waste forms destined to be placed there cannot be of a hazardous nature as defined by the Resource Conservation and Recovery Act. Results are presented from the first four fully radioactive ceramic waste forms produced and from seven ceramic waste forms produced from cold surrogate materials. The fully radioactive waste forms are approximately 2 kg in weight and were produced wit h salt used to treat 100 driver subassemblies of spent fuel.

  20. ALUMINUM REMOVAL AND SODIUM HYDROXIDE REGENERATION FROM HANFORD TANK WASTE BY LITHIUM HYDROTALCITE PRECIPITATION SUMMARY OF PRIOR LAB-SCALE TESTING

    SciTech Connect (OSTI)

    SAMS TL; GUILLOT S

    2011-01-27

    Scoping laboratory scale tests were performed at the Chemical Engineering Department of the Georgia Institute of Technology (Georgia Tech), and the Hanford 222-S Laboratory, involving double-shell tank (DST) and single-shell tank (SST) Hanford waste simulants. These tests established the viability of the Lithium Hydrotalcite precipitation process as a solution to remove aluminum and recycle sodium hydroxide from the Hanford tank waste, and set the basis of a validation test campaign to demonstrate a Technology Readiness Level of 3.

  1. Laboratory Analytical Procedures | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Analytical Procedures NREL develops laboratory analytical procedures (LAPs) to provide validated methods for biofuels and pyrolysis bio-oils research. Biomass Compositional Analysis These lab procedures provide tested and accepted methods for performing analyses commonly used in biofuels research. Bio-Oil Analysis These lab procedures allow for the analysis of raw and upgraded pyrolysis bio-oils. Microalgae Compositional Analysis These lab procedures help scientists and researchers

  2. ARM - Mission Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Summary Related Links ISDAC Home AAF Home AVP Aircraft Instrumentation, October 14-16, 2008 ARM Data Discovery Browse Data Post-Campaign Data Sets Flight Summary Table (PDF, 440K) ISDAC Wiki Mission Summary Journal Deployment Resources NSA Site ARM Data Plots Quick Links Experiment Planning ISDAC Proposal Abstract Full Proposal (pdf, 1,735K) Science Questions Science Overview Document for ISDAC (pdf, 525K) ISDAC Flight Planning Document (PDF, 216K) Collaborations Logistics Measurements

  3. CBECS 1995 - Executive Summary

    U.S. Energy Information Administration (EIA) Indexed Site

    Executive Summary The Commercial Buildings Energy Consumption Survey (CBECS) collects information on physical characteristics of commercial buildings, building use and occupancy...

  4. Operating Experience Summaries

    Broader source: Energy.gov [DOE]

    The Office of Environment, Health, Safety and Security (AU) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information between DOE facilities.

  5. University Research Summaries

    Broader source: Energy.gov [DOE]

    The Idaho National Laboratory published the U.S. Department of Energy's (DOE) Geothermal Technologies Office 2001 University Research Summaries

  6. Pinellas Remediation Agreement Summary

    Office of Environmental Management (EM)

    Legal Driver(s) CERCLA Atomic Energy Act of 1954, as amended Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former ...

  7. 2009 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analysis

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-03-15

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Wate Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2009. This annual summary report presents data and conclusions from the FY 2009 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

  8. Nevada Test Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in greater detail in the Nevada Test Site Environ- mental Report 2004 (DOENV11718-1080). ... mental programs and efforts Nevada Test Site Environmental Report 2004 Summary ...

  9. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration

    SciTech Connect (OSTI)

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1 well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.

  10. FY 2013 Summary Report: Post-Irradiation Examination of Zircaloy-4 Samples in Target Capsules and Initiation of Bending Fatigue Testing for Used Nuclear Fuel Vibration Integrity Investigations

    Broader source: Energy.gov [DOE]

    This study contributes to investigation and better understanding of cladding (High Flux Isotope Reactor used to simulate the effects of high burnup on fuel cladding) materials performance in extended storage and transportation through the conduct of small scale and separate effects tests (SET).

  11. Summary Report on Gamma Radiolysis of TBP/n-dodecane in the Presence of Nitric Acid Using the Radiolysis/Hydrolysis Test Loop

    SciTech Connect (OSTI)

    Dean R. Peterman; Bruce J. Mincher; Catherine L. Riddle; Richard D. Tillotson

    2010-08-01

    Design and installation has been completed for a state-of-the-art radiolysis/hydrolysis test loop system. The system is used to evaluate the effects of gamma radiolysis and acid hydrolysis on the stability and performance of solvent extraction process solvents. The test loop is comprised of two main sections; the solvent irradiation and hydrolysis loop and the solvent reconditioning loop. In the solvent irradiation and hydrolysis loop, aqueous and organic phases are mixed and circulated through a gamma irradiator until the desired absorbed dose is achieved. Irradiation of the mixed phases is more representative of actual conditions in a solvent extraction process. Additionally, the contact of the organic phase with the aqueous phase will subject the solvent components to hydrolysis. This hydrolysis can be accelerated by controlling the system at an elevated temperature. At defined intervals, the organic from the irradiation/hydrolysis loop will be transferred to the solvent reconditioning loop where the solvent is contacted with scrub, strip, and solvent wash solutions which simulate process flowsheet conditions. These two processes are repeated until the total desired dose is achieved. Since all viable solvent extraction components in an advanced fuel cycle must exhibit high radiolytic and hydrolytic stability, this test loop is not limited to any one solvent system but is applicable to all systems of interest. Also, the test loop is not limited to testing of process flowsheets. It is also a valuable tool in support of fundamental research on newly identified extractants/modifiers and the impact of gamma radiation on their stability in a dynamic environment. The investigation of the radiolysis of a TBP/n-dodecane process solvent in contact with aqueous nitric acid has been performed. These studies were intended to confirm/optimize the operability of the test loop system. Additionally, these data are directly applicable to numerous other solvent extraction

  12. Mirror Fusion Test Facility-B (MFTF-B) axicell configuration: NbTi magnet system. Design and analysis summary. Volume 1

    SciTech Connect (OSTI)

    Heathman, J.H.; Wohlwend, J.W.

    1985-05-01

    This report summarizes the designs and analyses produced by General Dynamics Convair for the four Axicell magnets (A1 and A20, east and west), the four Transition magnets (T1 and T2, east and west), and the twelve Solenoid magnets (S1 through S6, east and west). Over four million drawings and specifications, in addition to detailed stress analysis, thermal analysis, electrical, instrumentation, and verification test reports were produced as part of the MFTF-B design effort. Significant aspects of the designs, as well as key analysis results, are summarized in this report. In addition, drawing trees and lists off detailed analysis and test reports included in this report define the locations of the detailed design and analysis data.

  13. FY 2013 Summary Report: Post-Irradiation Examination of Zircaloy-4 Samples in Target Capsules and Initiation of Bending Fatigue Testing for Used Nuclear Fuel Vibration Integrity Investigations

    SciTech Connect (OSTI)

    Howard, Richard H.; Yan, Yong; Wang, Jy-An John; Ott, Larry J.; Howard, Rob L.

    2013-10-01

    This report documents ongoing work performed at Oak Ridge National Laboratory (ORNL) for the Department of Energy, Office of Fuel Cycle Technology Used Fuel Disposition Campaign (UFDC), and satisfies the deliverable for milestone M2FT-13OR0805041, “Data Report on Hydrogen Doping and Irradiation in HFIR.” This work is conducted under WBS 1.02.08.05, Work Package FT-13OR080504 ST “Storage and Transportation-Experiments – ORNL.” The objectives of work packages that make up the S&T Experiments Control Account are to conduct the separate effects tests (SET) and small-scale tests that have been identified in the Used Nuclear Fuel Storage and Transportation Data Gap Prioritization (FCRD-USED-2012-000109). In FY 2013, the R&D focused on cladding and container issues and small-scale tests as identified in Sections A-2.9 and A-2.12 of the prioritization report.

  14. AFIP-6 Characterization Summary Report

    SciTech Connect (OSTI)

    Dr. Dennis D. Keiser

    2011-12-01

    The AFIP-6 (ATR Full-size-plate In center flux trap Position) Characterization Summary Report outlines the fresh fuel characterization efforts performed during the AFIP-6 experiment. The AFIP-6 experiment was designed to evaluate the performance of monolithic uranium-molybdenum (U-Mo) fuels at a scale prototypic of Advanced Test Reactor (ATR) fuel plates (45-inches long). The AFIP-6 test was the first test with plates that were swaged into the rails of the assembly. This test served to examine the effects of a plate in a swaged condition with longer fuel zones (22.5-inches long), that were centered in the plate. AFIP-6 test plates employed a zirconium interlayer that was co-rolled with the fuel foil. Previous mini-plate and AFIP irradiation experiments performed in ATR have demonstrated the stable behavior of the interface between the U-Mo fuel and the zirconium interlayer.

  15. Component evaluation testing and analysis algorithms.

    SciTech Connect (OSTI)

    Hart, Darren M.; Merchant, Bion John

    2011-10-01

    The Ground-Based Monitoring R&E Component Evaluation project performs testing on the hardware components that make up Seismic and Infrasound monitoring systems. The majority of the testing is focused on the Digital Waveform Recorder (DWR), Seismic Sensor, and Infrasound Sensor. In order to guarantee consistency, traceability, and visibility into the results of the testing process, it is necessary to document the test and analysis procedures that are in place. Other reports document the testing procedures that are in place (Kromer, 2007). This document serves to provide a comprehensive overview of the analysis and the algorithms that are applied to the Component Evaluation testing. A brief summary of each test is included to provide the context for the analysis that is to be performed.

  16. SUMMARY AND RECOMMENDATIONS OF THE EXPERT PANEL OVERSIGHT COMMITTEE MEETING ON DOUBLE-SHELL TANK CORROSION MONITORING AND TESTING HELD AUGUST 4-5 2008

    SciTech Connect (OSTI)

    BOOMER KD

    2009-01-08

    The Expert Panel Oversight Committee (EPOC) on Double-Shell Tank Corrosion Monitoring and Testing has been overseeing the Fiscal Year FY 2008 experimental program being performed at CC Technologies (CCT) to optimize the chemistry control for corrosion limits in Double-Shell Tanks (DSTs). The EPOC met at the M & D Professional Services Conference Facility on August 4 and 5, 2008 to discuss various aspects of that responsibility including FY 2009 planning. Formal presentations were made to update the EPOC on the these subjects.

  17. PPO Benefit Summary | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summary Download a summary of benefits offered in our PPO health insurance option. PDF icon 2015 PPO Summary...

  18. Field test of short-notice random inspections for inventory-change verification at a low-enriched-uranium fuel-fabrication plant: Preliminary summary

    SciTech Connect (OSTI)

    Fishbone, L.G. |; Moussalli, G.; Naegele, G.; Ikonomou, P.; Hosoya, M.; Scott, P.; Fager, J.; Sanders, C.; Colwell, D.; Joyner, C.J.

    1994-04-01

    An approach of short-notice random inspections (SNRIs) for inventory-change verification can enhance the effectiveness and efficiency of international safeguards at natural or low-enriched uranium (LEU) fuel fabrication plants. According to this approach, the plant operator declares the contents of nuclear material items before knowing if an inspection will occur to verify them. Additionally, items about which declarations are newly made should remain available for verification for an agreed time. This report details a six-month field test of the feasibility of such SNRIs which took place at the Westinghouse Electric Corporation Commercial Nuclear Fuel Division. Westinghouse personnel made daily declarations about both feed and product items, uranium hexafluoride cylinders and finished fuel assemblies, using a custom-designed computer ``mailbox``. Safeguards inspectors from the IAEA conducted eight SNRIs to verify these declarations. Items from both strata were verified during the SNRIs by means of nondestructive assay equipment. The field test demonstrated the feasibility and practicality of key elements of the SNRI approach for a large LEU fuel fabrication plant.

  19. Draft Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2, 2016 DRAFT MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE February 2, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 HAB Report Summary

  20. Environmental Impact Statement Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Environmental Impact Statement Summary This DOE guidance is intended to help EIS preparers draft the EIS summary. PDF icon Environmental Impact Statement Summary More...

  1. Biofuels: Project summaries

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The US DOE, through the Biofuels Systems Division (BSD) is addressing the issues surrounding US vulnerability to petroleum supply. The BSD goal is to develop technologies that are competitive with fossil fuels, in both cost and environmental performance, by the end of the decade. This document contains summaries of ongoing research sponsored by the DOE BSD. A summary sheet is presented for each project funded or in existence during FY 1993. Each summary sheet contains and account of project funding, objectives, accomplishments and current status, and significant publications.

  2. Summary report of the drilling technologies tested at the Integrated Demonstration Project for cleanup of organic contaminants in soils and groundwater at non-arid sites

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Department of Energy`s Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of volatile organic compounds in soil and groundwater at SRS. The overall goal of the program is the demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Horizontal environmental well installation technology was one of the remediation technologies that was demonstrated at SRS. Four distinctly different systems of directional drilling and horizontal well installations were successfully demonstrated and evaluated. The four systems were developed in the petroleum industry, the river crossing industry, and the utility industry. The transfer of information concerning the horizontal environmental well installations has been facilitated by publishing a series of reports describing each individual demonstration. This is the final report in the series and provides a comprehensive evaluation of all four systems. The objectives of this report are to summarize the strengths and weaknesses of each drilling technology, describe and compare the problems encountered by each drilling technology, compare the compatibility of each technology with varying logistical and geological conditions, and discuss the expense of using each technology. This report is designed to be a horizontal environmental well reference document for the environmental remediation industry. An environmental problem holder may use this report to evaluate a directional drilling technology for use at his/her site.

  3. Summary Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... One of these alternatives is solar energy. Scientists have been working to understand the ... Having radon sensors in your home is a precautionary way to inform yourself 2013 Summary ...

  4. Draft GTCC EIS Summary

    Office of Environmental Management (EM)

    Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOEEIS-0375-D) February 2011 SUMMARY ENERGY U.S. DEPARTMENT OF ...

  5. Conference summary: Experimnetal

    SciTech Connect (OSTI)

    Thommpson, J.D.

    1995-12-31

    The conference is the 1995 International Conference on Strongly Correlated Electron Systems. The summary highlights research on the ``extended`` Doniach model, Kondo insulators, borocarbide superconductors, oxides (including cuprates), other phase transitions, and new materials.

  6. Compilation of ETR Summaries

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Technical Review Summaries Office of Technology Innovation and Development Office of Environmental Management November 2011 External Technical Review Summaries Number Title Report Date ETR-1 Flowsheet for the Hanford Waste Treatment Plant (WTP) March 2006 ETR-2 Tank 48 at the Savannah River Site (SRS) August 2006 ETR-3 Demonstration Bulk Vitrification System (DBVS) for Low Activity Waste (LAW) at Hanford September 2006 ETR-4 Salt Waste Processing Facility Design at the Savannah River

  7. Biennial Plan Summary

    National Nuclear Security Administration (NNSA)

    ` Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary Report to Congress March 2016 National Nuclear Security Administration United States Department of Energy Washington, DC 20585 Department of Energy/National Nuclear Security Administration | March 2016 Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary | Page i Message from the Administrator This Department of Energy's (DOE) National Nuclear Security Administration (NNSA) Fiscal

  8. Infrastructure Security Executive Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Executive Summary Energy, Climate, and Infrastructure Executive Summary / 3 Message from the VP Rick Stulen, Vice President Energy, Climate, & Infrastructure Security SMU Access to reliable, affordable, and sustainable sources of energy is essential for all modern economies. Since the late 1950s, we Americans have not been energy self-sufficient. Our addiction to foreign oil and fossil fuels puts our economy, our environment, and ultimately our national security at risk. Furthermore, there

  9. Summary of Natural Resources that Potentially Influence Human Intrusion at the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nye County, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2007-06-01

    In 1993, Raytheon Services Nevada completed a review of natural resource literature and other sources to identify potentially exploitable resources and potential future land uses near the Area 5 Radioactive Waste Management Site (RWMS) of the Nevada Test Site (NTS), Nye County, Nevada, that could lead to future inadvertent human intrusion and subsequent release of radionuclides to the accessible environment. National Security Technologies, LLC, revised the original limited-distribution document to conform to current editorial standards and U.S. Department of Energy requirements for public release. The researchers examined the potential for future development of sand, gravel, mineral, petroleum, water resources, and rural land uses, such as agriculture, grazing, and hunting. The study was part of the performance assessment for Greater Confinement Disposal boreholes. Sand and gravel are not considered exploitable site resources because the materials are common throughout the area and the quality at the Area 5 RWMS is not ideal for typical commercial uses. Site information also indicates a very low mineral potential for the area. None of the 23 mining districts in southern Nye County report occurrences of economic mineral deposits in unconsolidated alluvium. The potential for oil and natural gas is low for southern Nye County. No occurrences of coal, tar sand, or oil shale on the NTS are reported in available literature. Several potential future uses of water were considered. Agricultural irrigation is impractical due to poor soils and existing water supply regulations. Use of water for geothermal energy development is unlikely because temperatures are too low for typical commercial applications using current technology. Human consumption of water has the most potential for cause of intrusion. The economics of future water needs may create a demand for the development of deep carbonate aquifers in the region. However, the Area 5 RWMS is not an optimal location for

  10. South Dakota PrairieWinds Project Executive Summary Executive Summary

    Office of Environmental Management (EM)

    PrairieWinds Project Executive Summary Executive Summary This executive summary is included in the beginning of the Draft Environmental Impact Statement (DEIS) for the South Dakota PrairieWinds Project (Proposed Project) and is also intended to serve as a stand-alone document to provide a summary of the information contained within the full text version of the DEIS. For additional information on the topics contained within this summary please see the DEIS. S.1 INTRODUCTION Basin Electric Power

  11. STEP Participant Survey Executive Summary

    Broader source: Energy.gov [DOE]

    STEP Participant Survey Executive Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  12. Philadelphia Summary of Reported Data

    Broader source: Energy.gov [DOE]

    Summary of data reported by Better Buildings Neighborhood Program partner Philadelphia, Pennsylvania.

  13. ICEIWG Meeting Agendas and Summaries

    Broader source: Energy.gov [DOE]

    Download meeting agendas and summaries from the Indian Country Energy and Infrastructure Working Group (ICEIWG).

  14. ICEIWG Meeting Agendas and Summaries

    Office of Energy Efficiency and Renewable Energy (EERE)

    Meeting agendas and available summaries from previous Indian Country Energy and Infrastructure Working Group (ICEIWG) meetings.

  15. An annotated summary of the Information Model Design Procedure (IMDP)

    SciTech Connect (OSTI)

    Becker, S.D.

    1994-05-01

    This presentation documents the essential elements of the IMDP as applied at Sandia National Laboratories/New Mexico. The IMDP is an adaptation of the Natural-Language Information Analysis Methodology (NIAM) of G. M. Nijssen. The underlying purpose of both of these methodologies is to provide a formal, reproducible, and verifiable approach to specifying the information requirements of an information system. The IMDP spans the specification process from initial scoping; through verbalization of problem-domain facts, specification of constraints, and subtype analysis; and finally to application of a formal algorithm for developing a fifth-normal-form relational database design.

  16. 2008 Annual Merit Review Results Summary - 2. Applied Battery Research |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2. Applied Battery Research 2008 Annual Merit Review Results Summary - 2. Applied Battery Research DOE Vehicle Technologies Annual Merit Review 2008_merit_review_2.pdf (1.85 MB) More Documents & Publications 2008 Annual Merit Review Results Summary - 3. Battery Development, Testing, Simulation, Analysis 2008 Annual Merit Review Results Summary - 4. Exploratory Battery Research 2011 Annual Merit Review Results Report - Energy Storage Technologies

  17. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Center » Decision Summaries Decision Summaries July 29, 2016 Summary of Decisions - July 25, 2016 - July 29, 2016 Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal July 22, 2016 Summary of Decisions - July 18, 2016 - July 22, 2016 Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal July 15, 2016 Summary of Decisions - July 11, 2016 - July 15, 2016 Decisions were issued on: - Personnel

  18. Hanford Advisory Board Excerpt from Draft December Board Meeting Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Excerpt from Draft December Board Meeting Summary Hanford Advisory Board Page 1 Draft Sounding Board Summary December 12, 2013 Sounding Board - Hanford Tank Waste Retrieval, Treatment and Disposition Framework Introduction of process Susan Hayman, EnviroIssues, reviewed the sounding board procedures and noted that each Hanford Advisory Board (Board or HAB) member and alternate is allotted two minutes to share the perspective of the seat and constituency represented. Once all Board members and

  19. Storage Trends and Summaries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Summaries Storage Trends and Summaries Total Bytes Utilized The growth in NERSC's storage systems amounts to roughly 1.7x per year. Total Bytes Utilized Number of Files Stored The growth in the number of files stored is less than the growth in the number of bytes stored as the average file size has increased over time. The average file size as of August 2003 is about 30 MB. The median file size is closer to 1 MB. Number of Files Monthly I/O The growth rate of I/O is roughly the same as the

  20. AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Charging Infrastructure Data Summary Reports AVTA: ARRA EV Project Charging Infrastructure Data Summary Reports The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and

  1. Operating Experience Summary- 2014-05- October 15, 2014

    Broader source: Energy.gov [DOE]

    Inside this issue: OES 2014-05 contains two articles. The first OE Summary article is entitled: Fatality While Driving Gradall Material Handler on a Remote Forest Service Road. The second OE Summary article is entitled: Lithium Fire at the Sandia National Laboratories’ Plasma Material Test Facility Highlights Opportunities for Improvement in Work Planning and Hazards Analysis.

  2. Hanford Site Confined Space Procedure (HSCSP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    60 Revision 1 Hanford Site Confined Space Procedure (HSCSP) Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0360, Rev. 1 Hanford Site Confined Space Procedure (HSCSP) Published Date: 09/16/2015 Effective Date: 10/02/2015 ii CHANGE SUMMARY Minor changes made to format, grammar, and word choice in order to enhance consistency and readability. Section Change Details Signature Page Changed

  3. Hanford Site Beryllium Posting and Labeling Requirements Procedure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -003 Revision 1 Hanford Site Beryllium Posting and Labeling Requirements Procedure Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Approved for Public Release; Further Dissemination Unlimited DOE-0342-003, Rev. 1 Hanford Site Beryllium Posting and Labeling Requirements Procedure Published Date: 09-19-2013 Effective Date: 05-14-2014 Change Summary Page 1 of 1 Change Summary Revision # Date/Section Changed Change Details 1 3/19/13, Misc. changes as

  4. Writing Effective Initial Summary Ratings Initial Summary Rating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initial Summary Ratings Initial Summary Rating (ISR) At the end of the performance cycle, the rating official must prepare an ISR in ePerformance for each SES member who has ...

  5. Policies and Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    procedures Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  6. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 18, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE June 18, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tank Farm Vapors Advice Response ............................................................................................................ 1 Effectiveness of

  7. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Environmental Restoration and Disposal Facility Vertical Expansion ......................................................... 2 Committee Business

  8. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE April 12, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 Waste Treatment and

  9. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 26, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE April 26, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Plutonium Finishing Plant ........................................................................................................... 1 Leadership Workshop Preparation, FY 2017

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 14, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE June 14, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Hanford Site Tour ......................................................................................................................................... 2 Status of SWOC/Rev. 9 and 8C.

  11. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 3, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE November 3, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Agency Public Involvement ....................................................................................... 2 Waste Treatment Plant

  12. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 16, 2014 Summary of Decisions - December 30, 2013 - January 3, 2014 Decisions were issued on: - Privacy Act Appeal January 10, 2014 Summary of Decisions - MM DD YYYY - MM...

  13. HMO Benefit Summary | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HMO Benefit Summary Download a summary of benefits offered in our HMO health insurance option. PDF icon 2015 BlueAdvantage HMO Summary...

  14. Phoenix Roundtable Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phoenix Roundtable Summary Phoenix Roundtable Summary Summary from the DOE Office of Indian Energy roundtable held April 5, 2011, in Phoenix, Arizona. PDF icon ...

  15. Reno Roundtable Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 16, 2011, in Reno, Nevada. RenoRoundtableSummaryv2.pdf (224.14 KB) More Documents & Publications Pala Roundtable Summary Phoenix Roundtable Summary Phoenix Roundtable Summary

  16. 2013 Biological Hydrogen Production Workshop Summary Report ...

    Energy Savers [EERE]

    Biological Hydrogen Production Workshop Summary Report 2013 Biological Hydrogen Production Workshop Summary Report November 2013 summary report for the 2013 Biological Hydrogen ...

  17. STEP Financial Incentives Summary | Department of Energy

    Energy Savers [EERE]

    STEP Financial Incentives Summary STEP Financial Incentives Summary STEP Financial Incentives Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP). PDF ...

  18. Annual Planning Summaries: 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the ... March 25, 2013 2013 Annual Planning Summary for the Pacific Northwest Site Office The ...

  19. Procedures - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Accelerator Safety (SAD & ASE) Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  20. LAMPF: proposal status and summaries

    SciTech Connect (OSTI)

    Rayburn, L.; Talley, B.

    1982-03-01

    Revisions and additions are given for LAMPF proposal summaries and status reports. These apply to LA-7444-MS. (GHT)

  1. Business Model Guide Executive Summary

    Broader source: Energy.gov [DOE]

    The Business Model Guide Executive Summary by the U.S. Department of Energy's Better Buildings Neighborhood Program.

  2. Compilation of TRA Summaries

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2011 Technology Readiness Assessment Summary Number Title Report Date TRA-1 Waste Treatment and Immobilization Plant (WTP) Analytical Laboratory, Balance of Facilities and LAW Waste Vitrification Facilities at Hanford March 2007 TRA-2 Waste Treatment and Immobilization Plant (WTP) HLW Waste Vitrification Facility at Hanford March 2007 TRA-3 Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility at Hanford March 2007 TRA-4 K Basins Sludge Treatment Process at Hanford

  3. GLOVEBOX GLOVE CHARACTERIZATION SUMMARY

    SciTech Connect (OSTI)

    Korinko, P.

    2012-05-14

    A task was undertaken to determine primarily the permeation behavior of various glove compounds from four manufacturers. As part of the basic characterization task, the opportunity to obtain additional mechanical and thermal properties presented itself. Consequently, a total of fifteen gloves were characterized for permeation, Thermogravimetric Analysis, Puncture Resistance, Tensile Properties and Dynamic Mechanical Analysis. Detailed reports were written for each characterization technique used. This report contains the summary of the results.

  4. ARM - Mission Summary Journal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Summary Journal Related Links CLASIC Home AAF Home ARM Data Discovery Browse Data Post-Campaign CLASIC/CHAPS Special Session at AGU Annual Meeting, December 15-19 CLASIC Workshop, March 26-27 Data Sets Deployment Resources Measurement Platforms PNNL WRF-CuP Forecast Cloud Physics Lidar MODIS Airborne Simulator Data Mesonet Monitoring ARM Data Plots Experiment Planning CLASIC Proposal Abstract Science Questions Science and Implementation Plan (pdf) Measurement Platforms (pdf) CLASIC-Land

  5. Summary Site Environmental Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Environmental Report for Calendar Year 2013 ANL-14/02 (Summary) Environment, Safety, and Quality Assurance Division Argonne National Laboratory For more information about Argonne's Site Environmental Report, contact Theresa Davis, 630.252.6077 or tmdavis@anl.gov. For more information about Argonne and its programs, visit the laboratory's website at www.anl.gov or contact Communications, Education, and Public Affairs, at 630.252.5575. Katherine Obmascik edited the text. Photos by Mark Lopez.

  6. Geothermal Energy Summary

    SciTech Connect (OSTI)

    J. L. Renner

    2007-08-01

    Following is complete draft.Geothermal Summary for AAPG Explorer J. L. Renner, Idaho National Laboratory Geothermal energy is used to produce electricity in 24 countries. The United States has the largest capacity (2,544 MWe) followed by Philippines (1,931 MWe), Mexico (953 MWe), Indonesia (797 MWe), and Italy (791 MWe) (Bertani, 2005). When Chevron Corporation purchased Unocal Corporation they became the leading producer of geothermal energy worldwide with projects in Indonesia and the Philippines. The U. S. geothermal industry is booming thanks to increasing energy prices, renewable portfolio standards, and a production tax credit. California (2,244 MWe) is the leading producer, followed by Nevada (243 MWe), Utah (26 MWe) and Hawaii (30 MWe) and Alaska (0.4 MWe) (Bertani, 2005). Alaska joined the producing states with two 0.4 KWe power plants placed on line at Chena Hot Springs during 2006. The plant uses 30 liters per second of 75C water from shallow wells. Power production is assisted by the availability of gravity fed, 7C cooling water (http://www.yourownpower.com/) A 13 MWe binary power plant is expected to begin production in the fall of 2007 at Raft River in southeastern Idaho. Idaho also is a leader in direct use of geothermal energy with the state capital building and several other state and Boise City buildings as well as commercial and residential space heated using fluids from several, interconnected geothermal systems. The Energy Policy Act of 2005 modified leasing provisions and royalty rates for both geothermal electrical production and direct use. Pursuant to the legislation the Bureau of Land management and Minerals Management Service published final regulations for continued geothermal leasing, operations and royalty collection in the Federal Register (Vol. 72, No. 84 Wednesday May 2, 2007, BLM p. 24358-24446, MMS p. 24448-24469). Existing U. S. plants focus on high-grade geothermal systems located in the west. However, interest in non

  7. International Hydrogen Infrastructure Challenges Workshop Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE ...

  8. Impact of ethanol and butanol as oxygenates on SIDI engine efficiency and emissions using steady-state and transient test procedures

    Broader source: Energy.gov [DOE]

    Alcohols as gasoline blending agent at up to 85 vol-% levels were evaluated in a 2.2L direct injection SI engine for combustion, engine efficiency, and engine-out emissions effects at steady-state and transient test conditions

  9. Phoenix Roundtable Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phoenix Roundtable Summary Phoenix Roundtable Summary Summary from the DOE Office of Indian Energy roundtable held April 5, 2011, in Phoenix, Arizona. PhoenixRoundtableSummaryv2_0.pdf (193.52 KB) More Documents & Publications Phoenix Roundtable Summary Pala Roundtable Summary Anchorage Roundtable Summary

  10. Large-Scale Offshore Wind Power in the United States: Executive Summary

    SciTech Connect (OSTI)

    Musial, W.; Ram, B.

    2010-09-01

    This document provides a summary of a 236-page NREL report that provides a broad understanding of today's offshore wind industry, the offshore wind resource, and the associated technology challenges, economics, permitting procedures, and potential risks and benefits.

  11. Summary of Public Input

    Energy Savers [EERE]

    of Energy 9, 2015 - January 23, 2015 Summary of Decisions - January 19, 2015 - January 23, 2015 January 23, 2015 - 9:17am Addthis Personnel Security Decision (10 CFR Part 710) On January 23, 2013, an OHA Administrative Judge issued a decision in which he determined that an individual's DOE access authorization should not be granted. A local security office (LSO) had alleged that the individual: (1) is currently in possession of an active passport issued by a foreign country, which may

  12. FY 1996 activity summary

    SciTech Connect (OSTI)

    1997-04-01

    The US Department of Energy Office of Nuclear and Facility Safety provides nuclear safety policy, independent technical evaluation, and technical support. A summary of these activities is provided in this report. These include: (1) changing the mission of the former production facilities to storage and waste management; (2) stabilizing nuclear materials not recycled due to production cessation or interruptions; (3) reformulating the authorization basis for existing facilities to convert to a standards based approach for operations consistent with modern expectations; and (4) implementing a modern regulatory framework for nuclear facilities. Enforcement of the Price-Anderson Amendments Act is also reported.

  13. Appendix B: Summary Tables

    Gasoline and Diesel Fuel Update (EIA)

    U.S. Energy Information Administration | Analysis of Impacts of a Clean Energy Standard as requested by Chairman Bingaman Appendix B: Summary Tables Table B1. The BCES and alternative cases compared to the Reference case, 2025 2009 2025 Ref Ref BCES All Clean Partial Credit Revised Baseline Small Utilities Credit Cap 2.1 Credit Cap 3.0 Stnds + Cds Generation (billion kilowatthours) Coal 1,772 2,049 1,431 1,305 1,387 1,180 1,767 1,714 1,571 1,358 Petroleum 41 45 43 44 44 44 45 45 45 43 Natural

  14. Summary Max Total Units

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary Max Total Units *If All Splits, No Rack Units **If Only FW, AC Splits 1000 52 28 28 2000 87 59 35 3000 61 33 15 4000 61 33 15 Totals 261 153 93 ***Costs $1,957,500.00 $1,147,500.00 $697,500.00 Notes: added several refrigerants removed bins from analysis removed R-22 from list 1000lb, no Glycol, CO2 or ammonia Seawater R-404A only * includes seawater units ** no seawater units included *** Costs = (total units) X (estimate of $7500 per unit) 1000lb, air cooled split systems, fresh water

  15. 20% Wind Energy by 2030 - Chapter 2: Wind Turbine Technology Summary Slides

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 2: Wind Turbine Technology Summary Slides 20% Wind Energy by 2030 - Chapter 2: Wind Turbine Technology Summary Slides Summary slides for wind turbine technology, its challenges, and path forward 20percent_summary_chap2.pdf (1.31 MB) More Documents & Publications 20% Wind Energy by 2030: Increasing Wind Energy's Contribution to U.S. Electricity Supply Testing, Manufacturing, and Component Development Projects U.S. Offshore Wind Manufacturing and Supply Chain

  16. Summary Schedule_Rev.3_TRupdate_(10-24-14) Rev 2 JC.xlsx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    bolting catch up summary REACH Project Panel 6 Initial Closure Panel 7 Room 7 Closure Decontamination method development Decontamination testing - water spray and fixative NMED ...

  17. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31, 2016 DOE-ID Operations Summary For the Period April 1-April 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  18. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2016 DOE-ID Operations Summary For the Period March 1-March 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  19. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The committee approved the January meeting summary with minor edits received. Pam requested that emails include hyperlinks whenever possible to reduce the number of attachments ...

  20. Boise State University: Executive Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Summary With record growth in the wind energy industry and the increasing discussion of ... but also to educate our younger population about the benefits and utility of ...