National Library of Energy BETA

Sample records for test procedure guidance

  1. DOE Launches Public Test Procedure Guidance Website

    Broader source: Energy.gov [DOE]

    The Department of Energy this week launched a new online database offering guidance on the Department’s test procedures for appliances and commercial equipment.  The new database will provide a...

  2. Additional Guidance Regarding Application of Current Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

  3. Policy Guidance Memorandum #36 SES Competitive Staffing Procedures

    Broader source: Energy.gov [DOE]

    Policy Guidance Memorandum #36 provides overarching policy guidance and implementing procedures for the Senior Executive Service (SES) competitive recruitment process to ensure consistency,...

  4. Guidance for State Energy Program Recipients on Policy and Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pursuant to the Closeout of American Recovery and Reinvestment Act Grants | Department of Energy Guidance for State Energy Program Recipients on Policy and Procedures Pursuant to the Closeout of American Recovery and Reinvestment Act Grants Guidance for State Energy Program Recipients on Policy and Procedures Pursuant to the Closeout of American Recovery and Reinvestment Act Grants This document provides guidance for State Energy Program Recipients on Policy and Procedures Pursuant to the

  5. DOE Interim Guidance on Mercury Management Procedures and Standards |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Services » Waste Management » Waste Disposition » Long-Term Management and Storage of Elemental Mercury is in the Planning Stages » DOE Interim Guidance on Mercury Management Procedures and Standards DOE Interim Guidance on Mercury Management Procedures and Standards DOE, in consultation with the USEPA and State agencies, prepared this guidance on packaging, transportation, receipt, management, and long-term storage of elemental mercury at a DOE facility or

  6. Background information on RSO Test Deeming Guidance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information on RSO Test Deeming Guidance BPA has now had over two years of experience implementing Slice under the Regional Dialogue contract. Slice product customers are required...

  7. BLM Manual 8270 - General Procedural Guidance for Paleontological...

    Open Energy Info (EERE)

    Regulatory GuidanceGuideHandbook Abstract This manual provides uniform policy and direction for the BLM's Paleontological Resources Management Program. Author...

  8. Cathodic protection acceptance test procedure

    SciTech Connect (OSTI)

    Nordquist, E.M.

    1994-09-02

    This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

  9. Guidance

    Broader source: Energy.gov [DOE]

    This site provides a centralized topical resource for enforceable DOE and federal health, safety and security requirements and related guidance documents. DOE’s guidance documents support understanding, ensure technical and management capabilities and collaborative improvement efforts.

  10. POLICY GUIDANCE MEMORANDUM #35 Procedures for Compliance with Nepotism and Misuse of Position

    Broader source: Energy.gov [DOE]

    The purpose of this guidance is to establish the Department of Energy’s (DOE’s) Nepotism and Misuse of Position policy and procedures in order provide employees with sufficient information to...

  11. USACE EC 1165-2-216 Policy and Procedural Guidance for Processing...

    Open Energy Info (EERE)

    USACE EC 1165-2-216 Policy and Procedural Guidance for Processing Requests to Alter USACE Civil Works Projects Pursuant to 33 USC 408 Jump to: navigation, search OpenEI Reference...

  12. Meeting Concerning Potential Test Procedures and Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards for Set-Top Boxes and Network Equipment | Department of Energy Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment In compliance with the Department of Energy's guidance on ex parte communications (74 Fed. Reg. 52795 (Oct. 14, 2009)), this memorandum provides a summary of a March 7, 2012, meeting with DOE

  13. Guidance for State Energy Program Recipients on Policy and Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    State Energy Program Recipients on Policy and Procedures Pursuant to the Closeout of American Recovery and Reinvestment Act Grants sepcloseoutguidance.pdf More Documents &...

  14. Guidance for Informed Choice on Beryllium Testing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Beryllium Testing for Research and Beyond: The ABCs of the LPT January 2007 Cases of chronic beryllium disease (CBD), a legacy of the Department of Energy's (DOE) role in weapons production, have been increasing across the DOE complex. This trend has sparked increased concern about this serious occupational illness. In a national effort to identify current and former workers who have CBD or are sensitized to beryllium and to better understand the illness, DOE has set up a number of medical

  15. Standards and Test Procedures | Department of Energy

    Energy Savers [EERE]

    Appliance & Equipment Standards Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain ...

  16. Specifications and Test Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  17. Formal guidance for the use of science in EIA: Analysis of agency procedures for implementing NEPA

    SciTech Connect (OSTI)

    Malik, M.; Bartlett, R.V. . Dept. of Political Science)

    1993-01-01

    The authors undertake here an analysis and evaluation of official department and agency procedures for implementing the National Environmental Policy Act (NEPA). They assess the extent to which these procedures provide implementing guidance, beyond that provided by the Council on Environmental Quality (CEQ) regulations themselves, for those provisions of NEPA and the regulations pertaining to scientific integrity, content, and methodology. They analyze and evaluate content using criteria explicit or implicit in NEPA and the regulations, finding that many federal agencies still require little attention to scientific precepts and methodology in the implementation of NEPA. The substantive guidance provided by agencies on conceptual and methodological questions is general and, with few exceptions, minimal.

  18. Current Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim waiver, from the test procedure requirements for covered appliances and commercial equipment if certain criteria are satisfied. Regulations applicable to test procedure waivers for appliances can be found at 10 CFR 430.27; those applicable to test procedure waivers for commercial equipment are at 10 CFR 431.401. This

  19. Enforcement Guidance Supplement EGS:00-03 Appendix E- Operational Procedures

    Office of Environmental Management (EM)

    00-03 Appendix E- Operational Procedures for Enforcement Department of Energy Washington, DC 20585 September 12, 2000 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988,

  20. TMACS Test Procedure TP007: System administration

    SciTech Connect (OSTI)

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  1. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  2. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  3. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  4. TMACS Test Procedure TP002: Trending

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  5. TMACS Test Procedure TP011: Panalarm Interface

    SciTech Connect (OSTI)

    Seghers, R.; Washburn, S.J.

    1994-05-24

    The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions.

  6. Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with

  7. Test report - caustic addition system operability test procedure

    SciTech Connect (OSTI)

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  8. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) ...

  9. DACS upgrade acceptance test procedure

    SciTech Connect (OSTI)

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  10. Procedural guidance for reviewing exposure information under RCRA (Resource Conservation and Recovery Act) section 3019. Final report

    SciTech Connect (OSTI)

    Grogan, T.; Kayser, R.

    1986-09-26

    This guidance manual describes the procedures for permit writers in evaluating exposure information submitted under Resource Conservation and Recovery Act (RCRA) Section 3019. The integration of the review with existing RCRA permitting activities is also discussed. The document outlines procedures to follow in referring sites to the Agency for Toxic Substances and Disease Registry (ATSDR) for health evaluations.

  11. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  12. Test Procedure Development and Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how

  13. Test Procedures for Integrated Light-Emitting Diode Lamps; Final...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedures for Integrated Light-Emitting Diode Lamps - Final Rule (532.58 KB) More Documents & Publications ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures ...

  14. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

    Office of Environmental Management (EM)

    6 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; ...

  15. AVTA: Urban Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 ...

  16. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled...

    Energy Savers [EERE]

    Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated ...

  17. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedures for Dehumidifiers, Final Rule. dehumidtpfinalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures ...

  18. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; ...

  19. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 ...

  20. 2014-10-16 Issuance: Energy Conservation Program Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential ...

  1. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ...

  2. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Office of Environmental Management (EM)

    0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document ...

  3. ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice ... ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air ...

  4. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation ...

  5. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure...

    Office of Environmental Management (EM)

    Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for ...

  6. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, ...

  7. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures ...

  8. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    the Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned ... More Documents & Publications 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled ...

  9. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External ...

  10. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial ...

  11. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice...

    Broader source: Energy.gov (indexed) [DOE]

    ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories ... Service Lamps, Notice of Proposed Rulemaking Test Procedure for Compact Fluorescent Lamps:

  12. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, Notice ...

  13. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Conservation Program: Test Procedures for Certain Categories of General Service ... Lamps, Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; ...

  14. 2014-04-11 Issuance: Test Procedures for Residential Clothes...

    Office of Environmental Management (EM)

    1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed ...

  15. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures ...

  16. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for Manufactured ...

  17. Ex Parte Communication on Central Air-Conditioner Test Procedure...

    Office of Environmental Management (EM)

    Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues On October ... Energy (DOE) to discuss proposed amended test procedures for central air conditioners ...

  18. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final ...

  19. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ... Program for Consumer Products: Test Procedure for Ceiling Fans;NOPR 2014-09-16 ...

  20. Energy Conservation Program: Test Procedure for Pumps, Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation ...

  1. DOE Publishes Final Rule for Television Test Procedure | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  2. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  3. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for ...

  4. ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    12-18: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Final Rule ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures for ...

  5. ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Energy Conservation Program: Test Procedures for External Power Supplies, Final Rule ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures for External Power Supplies, ...

  6. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for ...

  7. Implementation Guidance, Drug Testing - December 3, 2007 | Department...

    Office of Environmental Management (EM)

    Q or L access authorization (security clearance) selected for Testing Designated ... Q or L access authorization (security clearance) will be in Testing Designated Positions ...

  8. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Test Procedure Rule DOE Issues Final Appliance Test Procedure Rule December 8, 2006 - 9:46am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced a final rule establishing new test procedures and related definitions to determine the energy efficiency of certain residential appliances and commercial equipment. The rulemaking clarifies and codifies the test procedures mandated by the Energy Policy Act (EPAct) of 2005. "These new test procedures are the

  9. SU-E-J-204: Radiation Dose to Patients Resulting From Image Guidance Procedures and AAPM TG-180 Update

    SciTech Connect (OSTI)

    Ding, G; Alaei, P

    2014-06-01

    Purpose: Image-guided radiation therapy (IGRT) is the new paradigm for patient positioning and target localization in radiotherapy. Daily imaging procedures add additional dose to the patient's treatment volume and normal tissues and may expose the organs at risk to unaccounted doses. This presentation is to update the progress of AAPM TG-180 which aims to provide strategies to quantify and account the dose from both MV and kV imaging in patient treatment planning. Methods: Our current knowledge on image guidance dose is presented. A summary of doses from image guidance procedures delivered to patients in relationship with therapeutic doses is given. Different techniques in reducing the image guidance dose are summarized. Typical organ doses resulting from different image acquisition procedures used in IGRT are tabulated. Results: Many techniques to reduce the imaging doses are available in clinical applications. There are large variations between dose to bone and dose to soft tissues for x-rays at kilovoltage energy range. Methods for clinical implementation of accounting for the imaging dose from an imaging procedure are available. Beam data from imaging systems can be generated by combining Monte Carlo simulations and experimental measurements for commissioning imaging beams in the treatment planning. Conclusion: The current treatment planning systems are not yet equipped to perform patient specific dose calculations resulting from kV imaging procedures. The imaging dose from current kV image devices has been significantly reduced and is generally much less than that resulting from MV. Because the magnitude of kV imaging dose is significantly low and the variation between patients is modest, it is feasible to estimate dose based on imaging producers or protocols using tabulated values which provides an alternative to accomplish the task of accounting and reporting imaging doses.

  10. TMACS Test Procedure TP008: SACS Interface. Revision 5

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions.

  11. TMACS test procedure TP009: Acromag driver. Revision 5

    SciTech Connect (OSTI)

    Bass, R.B.; Washburn, S.J.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system.

  12. Laboratory procedures for waste form testing

    SciTech Connect (OSTI)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  13. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  14. Energy Conservation Program: Final Rule; Test Procedures for...

    Office of Environmental Management (EM)

    Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP FinalRule (601.19 KB) More Documents & ...

  15. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

  16. Energy Conservation Program: Test Procedures for Certain Categories...

    Broader source: Energy.gov (indexed) [DOE]

    EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for ... SUMMARY: The U.S. Department of Energy (DOE) proposes to establish test procedures for ...

  17. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for ...

  18. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...

    Energy Savers [EERE]

    Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test ...

  19. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy Conservation Program: Test ...

  20. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy (DOE) has published a final rule regarding test procedures for ... EERE-2010-BT-TP-0010. Find product information about current standards and test ...

  1. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (334.01 KB) ETA-NTP004 Electric Vehicle Constant Speed Range Test (138.66 KB) ETA-NTP005 Electric Vehicle Rough Road

  2. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  3. TMACS test procedure TP001: Alarm management. Revision 6

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

  4. TMACS test procedure TP004: Reporting. Revision 4

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addressed the report generation capability of the TMACS. The features to be tested are generation of the alarm history report, equipment failure report, single-shell tank report and double-shell tank report.

  5. TMACS test procedure TP003: Graphics. Revision 5

    SciTech Connect (OSTI)

    Scanlan, P.K.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  6. Ex Parte Communication on Central Air-Conditioner Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Procedure Ex Parte Communication on Central Air-Conditioner Test Procedure On September 18, 2015, AHRI staff and Manufacturing Representatives met with representatives from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners. AHRI Ex Parte Memo CACTP (39.48 KB) More Documents & Publications Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues Ex Parte Memo on CAC/Dry Charged Units

  7. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures EV America Test Specifications (97.12 KB) ETA-TP001 Implementation of SAE Standard J1263, February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (55.05 KB) ETA-TP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (81.38 KB)

  8. Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure CEE and DOE staff discussed the importance of relying on the DOE test method as the sole metric for efficiency and energy use reporting. CEE_Notes_ClothesDryerTestProcedure_25Apr2016 (352.34 KB) More Documents & Publications 2015-03-23 Issuance: Energy Conservation Standards for Residential Clothes Dryers; Request for

  9. Guidance on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EECBG PROGRAM NOTICE 11-003 EFFECTIVE DATE: NOVEMBER 1, 2011 SUBJECT: GUIDANCE ON THE REQUIRED PERIOD FOR GRANTEES TO OBLIGATE FUNDS AND THE PROCEDURES FOR REPORTING OF OBLIGATED FUNDS FOR THE ENERGY EFFICIENCY CONSERVATION BLOCK GRANT PROGRAM (EECBG) PURPOSE To provide guidance and clarify the required period for obligation of funds as established in the Energy Efciency Conservation Block Grant (EECBG) Program Funding Opportunit Announcements (FOAs) Number DE-FOA-0000013 and DE-FOA-0000148, and

  10. Light duty utility arm equipment qualification test procedure

    SciTech Connect (OSTI)

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  11. AVTA: Urban Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 Implementation of SAE Standard J1263, Feb. 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (50.53 KB) ETA-UTP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (65.68 KB) ETA-UTP003

  12. ENERGY STAR Test Procedures and Verification | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » ENERGY STAR » ENERGY STAR Test Procedures and Verification ENERGY STAR Test Procedures and Verification The Department of Energy (DOE) is the lead agency in the development and revision of all test procedures for products in the ENERGY STAR® program, including those products that are also subject to DOE's Energy Conservation Standards program. As specifications are updated and new products or metrics are added to the ENERGY STAR program, DOE is

  13. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment; Final Rule | Department of Energy 0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document is a pre-publication Federal Register final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014. Though it is not intended or expected, should any discrepancy occur

  14. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Products; Notice of Proposed Rulemaking | Department of Energy 6 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for miscellaneous refrigeration products, as issued by the Deputy Assistant Secretary for Energy Efficiency on

  15. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rulemaking | Department of Energy TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking GSL TP SNOPR.pdf (309.44 KB) More Documents & Publications ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking ISSUANCE 2016-02-12: Energy Conservation Program: Energy Conservation Standards

  16. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans. 79 FR 500 (January 3, 2014). Find more information on the rulemaking, including milestones, statutory authority, rulemaking documents, and any other related rulemakings. All notices, public

  17. TMACS test procedure TP012: Panalarm software bridge

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-25

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date.

  18. 2014-10-14 Issuance: Test Procedures and Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy...

  19. DOE Publishes Final Rule for Plumbing Products Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a final rule regarding test procedures for showerheads, faucets, water closets, urinals, and commercial prerinse spray valves.

  20. AVTA: Oil Bypass Filter Specifications and Test Procedures | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Oil Bypass Filter Specifications and Test Procedures AVTA: Oil Bypass Filter Specifications and Test Procedures PuraDYN Oil Bypass Filtration System Evaluation Test Plan methodology is used in the testing of all oil bypass filters on the buses at the Idaho National Laboratory. PuraDYN Oil Bypass Filtration System Evaluation Test Plan (732.1 KB) More Documents & Publications Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles Effects of

  1. Procedure for Performing In-Plane Membrane Conductivity Testing |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy In-Plane Membrane Conductivity Testing Procedure for Performing In-Plane Membrane Conductivity Testing Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia htmwg_may09_conductivity_testing.pdf (1.01 MB) More Documents & Publications In-Plane Conductivity Testing Procedures and Results High Temperature Membrane Working Group Minutes In Plane Conductivity Testing, BekkTech LLC

  2. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) HEVAmerica Technical Specifications (164.3 KB) HEV Baseline Test Sequence (46.65 KB) HEV End of Life Test Sequence (29.89 KB) ETA-HTP01 Implementation of SAE Standard J1263 February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (118.71 KB) ETA-HTP02 Implementation

  3. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  4. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    EV America Test Specifications (97.12 KB) ETA-TP001 Implementation of SAE Standard J1263, ... Gradeability, and Deceleration Test Procedure (81.38 KB) ETA-HP003 ...

  5. Energy Conservation Program: Test Procedures for External Power...

    Broader source: Energy.gov (indexed) [DOE]

    EERE-2014-BT-TP-0043 RIN: 1904-AD36 Energy Conservation Program: Test Procedures for ... SUMMARY: On October 9, 2014, the U.S. Department of Energy proposed to revise its test ...

  6. ETA-FEP 001 - Fleet Test and Evaluation Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEP 001 Revision 0 Effective June 30, 2004 Fleet Test And Evaluation Procedure Prepared by ... 3 4.6 Vehicle Fueling Infrastructure 3 4.7 Test Objectives 4 5. Data Collection 4 5.1 ...

  7. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect (OSTI)

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  8. Rocky Flats ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Winstead, M.L.

    1995-09-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

  9. AVTA: Transit Vehicle Specifications and Test Procedures | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Transit Vehicle Specifications and Test Procedures AVTA: Transit Vehicle Specifications and Test Procedures All Advanced Vehicle Testing Activity transit projects follow a rigorous data collection and analysis protocol. Refer to "General Evaluation Plan: Fleet Test and Evaluation Projects" for information about fleet selection, data collection, and products related to new evaluation projects. More Documents & Publications Vehicle Technologies Office: 2010 Vehicle and

  10. Test Procedures for Building Energy Simulation Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Building Energy Simulation Tools Test Procedures for Building Energy Simulation Tools Lead Performer: -- National Renewable Energy Laboratory - Golden, CO -- J. Neymark & Associates - Golden, CO -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Partners: -- ASHRAE Standing Special Projects Committee 140 -- Residential Energy Services Network (RESNET) -- International Energy Agency (IEA) - Paris, France -- Trane Inc. - Piscataway, NJ -- Carrier Corp. -

  11. Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP Final_Rule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards

  12. Rocky Flats Ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Funston, G.A.

    1995-06-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

  13. Guidance on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program

    Broader source: Energy.gov [DOE]

    This document provides guidance and clarifies the required period for obligation of funds as established in the Energy Efficiency Conservation Block Grant (EECBG) Program Funding Opportunity Announcements (FOAs) Number DE-FOA-0000013 and DE-FOA-0000148, and to clarify the procedures for the reporting of funds obligated by the grantees.

  14. Test Procedure for UV Weathering Resistance of Backsheet | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Test Procedure for UV Weathering Resistance of Backsheet Test Procedure for UV Weathering Resistance of Backsheet Presented at the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado pvmrw13_ps5_toray_hirota.pdf (507.97 KB) More Documents & Publications QA TG5 UV, temperature and humidity Weathering Performance of PV Backsheets A Comparison of Key PV Backsheet and Module Properties from Fielded Module Exposures and Accelerated Test Conditions

  15. Webinar: Test Procedure for Battery Chargers; Notice of Data Availability

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774  (May 15, 2014). For more information, please visit...

  16. Energy Conservation Program: Test Procedures for Certain Categories...

    Broader source: Energy.gov (indexed) [DOE]

    1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 Docket No. EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for Certain Categories of ...

  17. DOE Seeks Comment on Application of Clothes Washer Test Procedure

    Broader source: Energy.gov [DOE]

    Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer...

  18. Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

  19. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination (Energy Conservation Standard) for Set-Top Boxes | Department of Energy Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes December 23, 2013 - 12:00am Addthis The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice

  20. Procedure for Performing PEM Single Cell Testing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PEM Single Cell Testing Procedure for Performing PEM Single Cell Testing Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia htmwg_may09_pem_single_cell_testing.pdf (1.45 MB) More Documents & Publications FSEC's MEA Test Protocol MEA Fabrication Lead Research and Development Activity for High Temperature, Low Relative Humidity Membrane Program

  1. Flammable gas interlock spoolpiece flow response test plan and procedure

    SciTech Connect (OSTI)

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  2. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  3. AVTA: Airport Ground Support Equipment Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Airport Ground Support Equipment Specifications and Test Procedures AVTA: Airport Ground Support Equipment Specifications and Test Procedures eGSE America Electric Baggage Tow Tractor (EBTT) Technical Specifications (136.16 KB) eGSE America Electric Aircraft PushBack Tractor (EAPT) Technical Specifications (85.7 KB) eGSE America Electric Aircraft Cargo Conveyor (EACC) Technical Specifications (76.64 KB) ETA-GAC001 Control, Close-out, and Storage of Documentation (76.84

  4. Departmental Personnel Security - Implementation Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Departmental Personnel Security - Implementation Guidance Implementation Guidance Overview of Security ClearanceAccess Authorization Process for Applicants Drug Testing ...

  5. solicitation guidance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    solicitation guidance - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  6. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect (OSTI)

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  7. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps...

    Broader source: Energy.gov (indexed) [DOE]

    Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of ...

  8. 100 Area soil washing bench-scale test procedures

    SciTech Connect (OSTI)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

  9. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a ...

  10. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners...

    Broader source: Energy.gov (indexed) [DOE]

    ISSUANCE 2016-04-26: Energy Conservation Program: Test Procedures for Portable Air Conditioners, Final Rule ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for ...

  11. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...

    Energy Savers [EERE]

    Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental ...

  12. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting...

    Broader source: Energy.gov (indexed) [DOE]

    notice of proposed rulemaking regarding test procedures for integrated light-emitting ... to this document. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting ...

  13. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting ...

  14. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect (OSTI)

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  15. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  16. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  17. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  18. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect (OSTI)

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  19. Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

  20. 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Consumer Furnaces and Boilers

  1. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    SciTech Connect (OSTI)

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

  2. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Test Procedure for Pumps Final Rule 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator Energy Conservation Program: Energy Conservation Standards for Pump, Notice of Proposed Rulemaking

  3. Office of Technical Guidance

    Broader source: Energy.gov [DOE]

    The Office of Technical Guidance develops, promulgates, and interprets national level policies, procedures, and guidance to identify (1) information that must be classified or controlled under statute or Executive order to protect the national security, to ensure the effective operation of the Government, or to protect the privacy interests of individuals and (2) classified or controlled information that may be declassified or decontrolled.

  4. Communications and Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Guidance Communications and Guidance Issued Guidance: Throughout the life of the Recovery Act, it has at times been necessary to issue guidance around certain policies or procedures. DOE Interim Guidance on Recipient Signage (May 2010) Buy American Act Guidance Davis-Bacon Compliance Guidance on Recovery Act Logo Usage (March 2009) Recovery Act Memos: Special reports written on cross-cutting themes of Recovery Act impact. Small Businesses Helping Drive Economy: Clean Energy, Clean Sites

  5. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-29

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes.

  6. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for ...

  7. Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas Kenneth J. Kelly, Brent K. Bailey, and Timothy C. Coburn National Renewable Energy Laboratory Wendy Clark Automotive Testing Laboratories, Inc. Peter Lissiuk Environmental Research and Development Corp. Presented at Society for Automotive Engineers International Spring Fuels and Lubricants Meeting Dearborn, MI May 6-8, 1996 The work described here was wholly funded by the U.S. Department of Energy,

  8. Environmental Justice: Guidance Under NEPA

    Broader source: Energy.gov [DOE]

    Guidance from the Council on Environmental Quality to assist Federal agencies with their NEPA procedures so that environmental justice concerns are effectively identified and addressed.

  9. Guidance Regarding NEPA Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document provides Council on Environmental Quality guidance on several topics: scoping, categorical exclusions, adoption procedures, contracting provisions, selection of ...

  10. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    SciTech Connect (OSTI)

    Flanagan, B.D.

    1995-07-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the {open_quotes}Free Drop Test{close_quotes} procedure for the SPM-1 package.

  11. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters...

    Office of Environmental Management (EM)

    Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002 Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, ...

  12. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...

    Energy Savers [EERE]

    7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking ...

  13. WIPP waste characterization program sampling and analysis guidance manual

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Waste Characterization Program Sampling and Analysis Guidance Manual (Guidance Manual) provides a unified source of information on the sampling and analytical techniques that enable Department of Energy (DOE) facilities to comply with the requirements established in the current revision of the Quality Assurance Program Plan (QAPP) for the WIPP Experimental-Waste Characterization Program (the Program). This Guidance Manual includes all of the sampling and testing methodologies accepted by the WIPP Project Office (DOE/WPO) for use in implementing the Program requirements specified in the QAPP. This includes methods for characterizing representative samples of transuranic (TRU) wastes at DOE generator sites with respect to the gas generation controlling variables defined in the WIPP bin-scale and alcove test plans, as well as waste container headspace gas sampling and analytical procedures to support waste characterization requirements under the WIPP test program and the Resource Conservation and Recovery Act (RCRA). The procedures in this Guidance Manual are comprehensive and detailed and are designed to provide the necessary guidance for the preparation of site specific procedures. The use of these procedures is intended to provide the necessary sensitivity, specificity, precision, and comparability of analyses and test results. The solutions to achieving specific program objectives will depend upon facility constraints, compliance with DOE Orders and DOE facilities' operating contractor requirements, and the knowledge and experience of the TRU waste handlers and analysts. With some analytical methods, such as gas chromatography/mass spectrometry, the Guidance Manual procedures may be used directly. With other methods, such as nondestructive/destructive characterization, the Guidance Manual provides guidance rather than a step-by-step procedure.

  14. DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for commercial refrigeration equipment.

  15. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  16. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dehumidifiers, Final Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This document is the Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule. dehumid_tp_finalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice

  17. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clothes Washers, Final Rule | Department of Energy 7: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule This document is the Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule. clothes_washers_tp_finalrule.pdf (1.53 MB) More Documents & Publications 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed

  18. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Chargers, Final Rule | Department of Energy Test Procedure for Battery Chargers, Final Rule ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule This document is the Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule. Battery Chargers TP Final Rule.pdf (449.69 KB) More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy

  19. AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy in Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures Plug-in Hybrid Electric Vehicle Test Plan DRAFT - Integrated Test Plan and Evaluation Program for Review for Plug-in Hybrid Electric Vehicles (PHEVs) (2.33 MB) More Documents & Publications AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Vehicle Technologies Office: 2010 Vehicle and Systems Simulation and Testing

  20. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test ...

  1. BESTEST: Test Procedures Building Energy SimulationŽ Tools

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ron.Judkoff@nrel.gov BESTEST: Test Procedures "Building Energy Simulation" Tools 2014 ... methods of test that can be cited by regulatory bodies for software certification. ...

  2. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information ISSUANCE 2015-12-04: Energy Conservation Standards and Test ...

  3. Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures. For more information on these procedures please click on the items below: Federal Advisory Committee Act Nevada Site Specific Advisory Board Standard Operating Procedures Advisory Committee Management Program Manual National Charter EM Site Specific Advisory Board Policies and Procedures Desk Reference Send mail to

  4. Technical Guidance

    Broader source: Energy.gov [DOE]

    The Office of Technical Guidance, within the Office of Health, Safety and Security develops and issues Government-wide and Department-wide technical guidance to ensure that classified nuclear...

  5. SEP Guidance

    Broader source: Energy.gov (indexed) [DOE]

    SEP PROGRAM NOTICE 10-008C EFFECTIVE DATE (Revised): March 14, 2011 ORIGINALLY ISSUED: December 7, 2009 SUBJECT: GUIDANCE FOR STATE ENERGY PROGRAM GRANTEES ON FINANCING PROGRAMS. PURPOSE To provide guidance to the Department of Energy's (Department or DOE) State Energy Program (SEP) grantees on financing programs. This guidance supersedes SEP Program Notice 10-008B, which was issued on August 10, 2010. SCOPE The provisions of this guidance apply to grantees of SEP funds, pursuant to Formula

  6. Field Test Best Practices: A Dynamic Web Tool for Practical Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    o perated b y t he A lliance f or S ustainable E nergy, L LC. Field Test Best Practices ... Difficult to find general guidelines and examples of well-designed field test plans No ...

  7. ISSUANCE 2015-04-29: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters Notice of petition to extend test procedure compliance date and request for comment

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters; Notice of petition to extend test procedure compliance date and request for comment.

  8. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    SciTech Connect (OSTI)

    Goetzler, William; Sutherland, Timothy; Kar, Rahul; Foley, Kevin

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  9. RH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2008-01-12

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the "RH-TRU 72-B cask") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a

  10. RH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2006-11-07

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) 71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these

  11. SEAB Guidance

    Broader source: Energy.gov [DOE]

    Listed below in chronological order are the letters and memoranda issued by SEAB to the Department providing their views and guidance on the respective topics. 

  12. Test procedure for measurement of performance vs temperature of Whittaker electrochemical cell

    SciTech Connect (OSTI)

    Vargo, G.F.

    1997-01-23

    This document is the test procedure to systematically test the Whittaker cells between the temperatures of -20 degrees F and +120 degrees F. These sensors are used on the Rotary Mode Core Sampling (RMCS) flammable gas interlock (FGI), to detect and quantify hydrogen gas. This procedure supports the testing, that is being performed after cold weather attempts on the Whittaker cell failed.

  13. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for

    Office of Environmental Management (EM)

    Manufactured Housing, Notice of Proposed Rulemaking | Department of Energy 9: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking. Manufactured Housing TP NOPR.pdf (367.35 KB) More Documents &

  14. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for

    Office of Environmental Management (EM)

    Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking | Department of Energy 26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking. Dedicated Purpose Pool Pumps TP NOPR.pdf

  15. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    External Power Supplies, Notice of Public Meeting | Department of Energy 29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting This document is the notice of public meeting for Energy Conservation Program: Test Procedures for External Power Supplies. externalpowersupplies_tp_nopm.pdf (236.66 KB) More Documents &

  16. 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers;

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Proposed Rulemaking | Department of Energy 1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedure amendments for residential clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 11, 2014. Though it is not

  17. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps;

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Notice of Proposed Rulemaking | Department of Energy Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for high-intesity discharge lamps, as issued by the Deputy Assistant Secretary for Energy

  18. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability | Department of Energy Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a pre-publication Federal Register notice of data availability regarding test procedures for battery chargers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 8, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted

  19. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lamps; Supplemental Notice of Proposed Rulemaking | Department of Energy 16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for integrated light-emitting diode lamps, as issued by the

  20. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ballasts; Notice of Proposed Rulemaking | Department of Energy 4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14,

  1. 2014-10-16 Issuance: Energy Conservation Program Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Clothes Dryers, Notice of Public Meeting | Department of Energy 6 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting clothes_dryer_nopm.pdf (194.46 KB) More Documents & Publications 2014-01-31

  2. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Rulemaking | Department of Energy 7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any

  3. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Rulemaking | Department of Energy 2 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 12, 2015. Though it is not intended or

  4. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Rulemaking | Department of Energy 3 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for furnaces and boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 13, 2015. Though it is not intended or expected, should any

  5. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ceiling Fans, Supplemental Notice of Proposed Rule | Department of Energy Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ceiling_fans_tp_snopr.pdf (526.51 KB) More Documents & Publications Energy

  6. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conventional Ovens, Final Rule | Department of Energy 18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule This document is the Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule. conventional_ovens_tp_finalrule.pdf (448.83 KB) More Documents & Publications ISSUANCE 2015-05-29: Energy Conservation Program: Energy Conservation

  7. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Battery Chargers, Notice of Proposed Rulemaking | Department of Energy 27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking. battery_chargers_tp_nopr.pdf (336.62 KB) More Documents & Publications ISSUANCE

  8. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compressors, Notice of Proposed Rulemaking | Department of Energy 22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking. Compressors TP NOPR.pdf (970.54 KB) More Documents & Publications Docket # EERE-2014-BT-STD-0051,

  9. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Central Air Conditioners and Heat Pumps Final Rule | Department of Energy 5-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule This document is the Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule. Central Air Conditioners and Heat Pumps TP Final Rule.pdf (2.2 MB) More

  10. DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

  11. 2014-06-27 Issuance: Test Procedures for Residential and Commercial...

    Broader source: Energy.gov (indexed) [DOE]

    solely as a means to facilitate the public's access to this document. 2014-06-27 Test Procedures for Residential and Commercial Water Heaters; Final Rule More Documents &...

  12. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ceiling Fan Light Kits, Final Rule | Department of Energy 15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light

  13. Argonne Facilitation of PHEV Standard Testing Procedure (SAE...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications SAE Standards Development HEV, PHEV, EV Test Standard Development and Validation Off-Cycle Benchmarking of PHEVs; Wide Range of Temperatures and ...

  14. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    SciTech Connect (OSTI)

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  20. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  1. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  2. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  3. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  4. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  5. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  6. Thermal test procedure for a paraboloid concentrator solar cooker

    SciTech Connect (OSTI)

    Mullick, S.C.; Kandpal, T.C.; Kumar, S. )

    1991-01-01

    Suitable thermal tests have been identified for performance evaluation of a concentrating solar cooker. These tests provide parameters that characterize the performance of the solar cooker, and are more or less independent of the climatic variables. The overall heat loss factor is obtained from the cooling curve and the optical efficiency factor is determined from the heating curve - both under full load conditions. The performance characteristic curve for the solar cooker is obtained and discussed. The study indicates that the no load test, which is useful in the case of a box type solar cooker, is not appropriate in the case of concentrator type cookers.

  7. Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues | Department of Energy Procedure - ICM Issues Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues On October 8, 2015, AHRI staff and Independent Coil Manufacturer (ICM) Representatives met with a representative from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners and how they would impact ICM manufacturers. 10_8_15AHRI Ex Parte Memo ICM (53.24 KB) More Documents & Publications Ex Parte Communication

  8. GUIDANCE ON CONDUCTING ADVERSE DIVERSITY ANALYSIS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GUIDANCE ON CONDUCTING ADVERSE DIVERSITY ANALYSIS The Uniform Guidelines for Employee Selection Procedures adopted by the Equal Employment Opportunity Commission (EEOC), Department of Labor's Office of Federal Contract Compliance Programs (OFCCP), and U.S. Department of Justice in 1978 set out accepted statistical tests for assessing possible discriminatory impact of employment actions on protected classifications of employees. See 29 CFR Part 1607. Agencies and litigants commonly use

  9. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  10. ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

  11. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

  12. ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  13. 2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

  14. ISSUANCE 2016-03-24: Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

  15. ISSUANCE 2016-08-05: Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

  16. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

  17. ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

  18. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  19. Gas characterization system 241-AN-105 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  20. Gas characterization system 241-AW-101 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  1. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    SciTech Connect (OSTI)

    Biyani, R.K.; Hendrickson, D.W.

    1997-07-18

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations.

  2. In-Plane Conductivity Testing Procedures and Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In-Plane Conductivity Testing Procedures and Results In-Plane Conductivity Testing Procedures and Results This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007. htmwg_bekktech.pdf (354.02 KB) More Documents & Publications Requirements for Samples High Temperature Membrane Working Group Minutes Progress and Status on Through-Plane Resistance and Conductivity Measurement of Fuel Cell Membranes

  3. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    SciTech Connect (OSTI)

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  4. Guidance Regarding NEPA Regulations (CEQ, 1983)

    Broader source: Energy.gov [DOE]

    This document provides Council on Environmental Quality guidance on several topics: scoping, categorical exclusions, adoption procedures, contracting provisions, selection of alternatives in licensing and permitting situations, and tiering.

  5. Environmental Justice: Guidance Under NEPA (CEQ, 1997)

    Broader source: Energy.gov [DOE]

    Guidance from the Council on Environmental Quality to assist Federal agencies with their NEPA procedures so that environmental justice concerns are effectively identified and addressed.

  6. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE-2015-BT-TP-0007-0002 | Department of Energy Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002 Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002 Energy Conservation Program for Consumer Products and Certain Industrial Equipment: Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002, specifically issues surrounding the Conversion Factor status. EXPARTE MEMO 4 26-rbc (83.88 KB) More Documents

  7. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  8. 2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

  9. Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure

    SciTech Connect (OSTI)

    ZAKRAJSEK, M.F.

    2000-10-17

    The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

  10. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

  11. 2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  12. 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 31, 2014.

  13. CRAD, System Operating Test Procedures- October 23, 2014 (EA CRAD 31-05, Rev. 0)

    Broader source: Energy.gov [DOE]

    This Criteria Review and Approach Document (EA CRAD 31-05, Rev. 0) provides objectives, criteria, and approaches for reviewing startup testing procedures for installed structures, systems, or components.

  14. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    SciTech Connect (OSTI)

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  15. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting | Department of Energy 01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting This document is a pre-publication Federal Register notice of proposed rulemaking and public meeting regarding

  16. Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

    SciTech Connect (OSTI)

    Rice, C. Keith; Munk, Jeffrey D.; Shrestha, Som S.

    2015-08-01

    This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

  17. Accuracy of the European solar water heater test procedure. Part 1: Measurement errors and parameter estimates

    SciTech Connect (OSTI)

    Rabl, A.; Leide, B. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    The Collector and System Testing Group (CSTG) of the European Community has developed a procedure for testing the performance of solar water heaters. This procedure treats a solar water heater as a black box with input-output parameters that are determined by all-day tests. In the present study the authors carry out a systematic analysis of the accuracy of this procedure, in order to answer the question: what tolerances should one impose for the measurements and how many days of testing should one demand under what meteorological conditions, in order to be able to quarantee a specified maximum error for the long term performance The methodology is applicable to other test procedures as well. The present paper (Part 1) examines the measurement tolerances of the current version of the procedure and derives a priori estimates of the errors of the parameters; these errors are then compared with the regression results of the Round Robin test series. The companion paper (Part 2) evaluates the consequences for the accuracy of the long term performance prediction. The authors conclude that the CSTG test procedure makes it possible to predict the long term performance with standard errors around 5% for sunny climates (10% for cloudy climates). The apparent precision of individual test sequences is deceptive because of large systematic discrepancies between different sequences. Better results could be obtained by imposing tighter control on the constancy of the cold water supply temperature and on the environment of the test, the latter by enforcing the recommendation for the ventilation of the collector.

  18. Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results

    SciTech Connect (OSTI)

    Muller, M.

    2009-09-01

    This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

  19. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  20. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  1. POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Guidance on Transition to Eliminate FCIP (Expired) POLICY GUIDANCE MEMORANDUM 19 Guidance on Transition to Eliminate FCIP (Expired) THIS GUIDANCE HAS EXPIRED Guidance on the...

  2. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  3. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  4. EECBG Program Notice 10-020B, Guidance for Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B, Guidance for Energy Efficiency and Conservation Block Grant Recipients on Closeout Procedures EECBG Program Notice 10-020B, Guidance for Energy Efficiency and Conservation Block ...

  5. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Office of Energy Efficiency and Renewable Energy (EERE)

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  6. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect (OSTI)

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  7. GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS ON

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CLOSEOUT PROCEDURES FOR NON-STATE ENERGY OFFICE RECIPIENTS. | Department of Energy GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS ON CLOSEOUT PROCEDURES FOR NON-STATE ENERGY OFFICE RECIPIENTS. GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS ON CLOSEOUT PROCEDURES FOR NON-STATE ENERGY OFFICE RECIPIENTS. This document provides guidance for energy efficiency and block grant recipients on closeout procedures for non-state energy office recipients.

  8. Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1

    SciTech Connect (OSTI)

    Satoh, J.A.

    1995-05-25

    This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

  9. DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for residential water heaters and certain commercial water heaters.

  10. GUIDANCE TO COMPLETING THE SELF-DIRECTED RBSM INTERVIEW FORM

    Office of Environmental Management (EM)

    GUIDANCE ON CONDUCTING ADVERSE DIVERSITY ANALYSIS The Uniform Guidelines for Employee Selection Procedures adopted by the Equal Employment Opportunity Commission (EEOC), Department of Labor's Office of Federal Contract Compliance Programs (OFCCP), and U.S. Department of Justice in 1978 set out accepted statistical tests for assessing possible discriminatory impact of employment actions on protected classifications of employees. See 29 CFR Part 1607. Agencies and litigants commonly use

  11. Operability test procedure for rotary mode core sampling system {number_sign}4

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  12. Operability test procedure for rotary mode core sampling system {number_sign}3

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  13. Comparison of Real World Energy Consumption to Models and DOE Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures September 2011 i NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness,

  14. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  15. 2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  16. 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Final Rule regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 24, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  17. 2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  18. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance. [Contains Glossary

    SciTech Connect (OSTI)

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs.

  19. ISSUANCE 2016-02-22: Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers

  20. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

  1. Performance testing of HEPA filters: Progress towards a European standard procedure

    SciTech Connect (OSTI)

    Dyment, J.

    1997-08-01

    Proposals for a future European testing procedure for {open_quotes}High Efficiency Particulate Air Filters (HEPA and ULPA){close_quotes} are being developed by CEN (Comite Europeen de Normalisation). The new standard will be given the status of national standard in participating countries, conflicting national standards being withdrawn. The standard will comprise 5 parts covering the grouping and classification of HEPA and ULPA filters according to their efficiency, fundamental principles of testing, marking etc (in part 1). Part 2 will cover aerosol production, measurement principles, counting equipment and statistics. Parts 3-5 will cover testing flat sheet media, leak testing of filter elements and the efficiency testing of filter elements respectively. The efficiency test methods allow the use of either homogeneous monodisperse or polydisperse aerosols for the determination of particulate filtration efficiencies as a function of particle size. The particle size at which maximum penetration occurs is first determined in flat sheet media tests; tests on filter elements (constructed using the same filter medium) may be carried out using either a homogeneous monodisperse aerosol of the size at which maximum penetration occurs (MPPS) or a polydisperse aerosol whose median size is close to the MPPS. Tests with monodisperse aerosols may be conducted using condensation nucleus counting equipment; tests using polydisperse test aerosols require the use of optical sizing particle counters. When determining the efficiency of filter elements the downstream aerosol concentrations may be determined from air samples obtained using either an overall method (single point sampling after mixing) or a scan method. The scan method also allows {open_quotes}local{close_quotes} efficiency values to be determined. 1 ref., 1 fig., 1 tab.

  2. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel to nickel-copper

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2301-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel, NO2200 or NO2201 (P-41) to nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  3. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel-copper

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-1302-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  4. GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AND CONSERVATION BLOCK GRANT RECIPIENTS ON CLOSEOUT PROCEDURES FOR NON-STATE ENERGY OFFICE RECIPIENTS. GUIDANCE FOR ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT RECIPIENTS ON ...

  5. WPN 02-5: Health and Safety Guidance

    Broader source: Energy.gov [DOE]

    To provide grantees with guidance in addressing hazards and remediation they should consider, at a minimum, when developing their health and safety plans and procedures.

  6. POLICY GUIDANCE MEMORANDUM #33 - Requirements for DOE Delegated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Policy Guidance Memorandum 33 - Requirements for DOE Delegated Examining Procedures Responsible Contacts Tiffany Wheeler Human Resources Specialist E-mail ...

  7. Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014

    SciTech Connect (OSTI)

    Alan Giesbrecht

    2014-05-01

    The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

  8. 2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  9. 2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  10. DOE response to questions from AHAM on the supplemental proposed test procedure

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers"? (1) What exactly does the language in Part B mean and what is the intent? * The intent of Part B is to use the methodology that AHAM had suggested specifically for extra-hot cycles, but to make it more broadly applicable to any temperature combination that is locked out of the Normal cycle. * The proposed Part (B) language is meant to be consistent with GE's original suggestion in

  11. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect (OSTI)

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  12. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    SciTech Connect (OSTI)

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  13. POLICY GUIDANCE MEMORANDUM #31 - Procedures for Regularizing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    andor priority consideration for veterans' preference eligibles andor non-veterans' preference applicants under both Delegated Examining and Merit Promotion selection cases. ...

  14. Rulemaking Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rulemaking Guidance Rulemaking Guidance The following rulemaking policies are available: Rulemaking Guidance on DOE Involvement in Consensus Negotiations for energy Conservation...

  15. POLICY GUIDANCE MEMORANDUM #33 - Requirements for DOE Delegated Examining

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procedures | Department of Energy 3 - Requirements for DOE Delegated Examining Procedures POLICY GUIDANCE MEMORANDUM #33 - Requirements for DOE Delegated Examining Procedures The purpose of this guidance is to establish the Department of Energy's (DOE's) Delegated Examining policy and procedures in order to ensure an effective competitive examining program that supports mission accomplishments and is in accordance with merit system principles and applicable laws and regulations. Policy

  16. Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint

    SciTech Connect (OSTI)

    Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

    2012-03-01

    Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

  17. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking (version2)

  18. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

  19. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

  20. ISSUANCE 2016-08-01: Energy Conservation Program: Corrction; Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  1. ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

  2. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

    Broader source: Energy.gov [DOE]

    Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

  3. ISSUANCE 2015-05-12: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

  4. ISSUANCE 2016-08-01: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  5. SEP Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance SEP Guidance Guidance for State Energy Program Grantees sep_financing_guidance_2011-03-15.pdf (224.45 KB) More Documents & Publications SEP Program Notice 10-008B - Guidance for State Energy Program Grantees on Financing Programs EECBG Guidance SEP Program Notice 10-013

  6. POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate FCIP

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Expired) | Department of Energy 9 Guidance on Transition to Eliminate FCIP (Expired) POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate FCIP (Expired) THIS GUIDANCE HAS EXPIRED Guidance on the elimination of the Federal Career Intern Program (FCIP) POLICY GUIDANCE MEMORANDUM #19 Guidance on Transition to Eliminate FCIP (Expired) (4.84 MB) Responsible Contacts Ahtora Brooks Human Resource Specialists E-mail Ahtora.Brooks@Hq.Doe.Gov Phone 202-586-1239 More Documents &

  7. IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENERGY STAR® | Department of Energy IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® IESNA LM-80-08 - An Overview of the Test Procedure and How it is Used for ENERGY STAR® This October 30, 2008 webcast provided an overview of LM-80-08, Approved Method for Measuring Lumen Maintenance of LED Light Sources, and how DOE's ENERGY STAR program for Solid-State Lighting (SSL) Luminaires will use LM-80 to estimate lifetime for qualified SSL Luminaires. Richard

  8. EECBG 2016 Guidance Documents

    Broader source: Energy.gov [DOE]

    The Energy Efficiency and Conservation Block Grant (EECBG) Program released guidance documents that explain how the recipients of EECBG funds need to report and manage those funds.

  9. wind_guidance

    Broader source: Energy.gov [DOE]

    Guidance to Accompany Non-Availability Waiver of the Recovery Act Buy American Provisions for 5kW and 50kW Wind Turbines

  10. Site Transition Guidance

    Office of Environmental Management (EM)

    Site Transition Guidance March 2010 Office of Environmental Management U.S. Department of Energy Washington D. C. 20585 Standard Review Plan (SRP) Technical Framework for EM...

  11. Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Justice General Guidance on NEPA NEPA History NEPA Implementation NEPA and Other Laws NEPA Policy Public Participation Special Topics in NEPA Documentation All NEPA ...

  12. State Energy Program Guidance

    Broader source: Energy.gov [DOE]

    The State Energy Program (SEP) has released the following guidance documents, listed chronologically below, that explain how states must report and manage SEP program funding.

  13. Buy American Guidance Documents

    Office of Energy Efficiency and Renewable Energy (EERE)

    Projects funded by the American Recovery and Reinvestment Act of 2009 (Recovery Act) were required to follow the Buy American Provision. Below are Buy American guidance documents.

  14. LCC Guidance Rates

    Broader source: Energy.gov [DOE]

    Notepad text file provides the LCC guidance rates in a numbered format for the various regions throughout the U.S.

  15. Commissioning guidance for ESPCs

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Guidance for facility managers describing the commissioning process in Super ESPC contracts and how these contracts can achieve the objective of meeting facility performance requirements.

  16. SU-E-J-08: Comparison of Unintended Radiation Doses to Organs at Risk Resulting From the Out-Of-Field Therapeutic Beams and From Image-Guidance X-Ray Procedures

    SciTech Connect (OSTI)

    Ding, G; Wang, L

    2015-06-15

    Purpose: The unintended radiation dose to organs at risk (OAR) can be contributed from imaging guidance procedures as well as from leakage and scatter of therapeutic beams. This study compares the imaging dose with the unintended out-of-field therapeutic dose to patient sensitive organs. Methods: The Monte Carlo EGSnrc user codes, BEAMnrc and DOSXYZnrc, were used to simulate kV X-ray sources from imaging devices as well as the therapeutic IMRT/VMAT beams and to calculate doses to target and OARs on patient treatment planning CT images. The accuracy of the Monte Carlo simulations was benchmarked against measurements in phantoms. The dose-volume histogram was utilized in analyzing the patient organ doses. Results: The dose resulting from Standard Head kV-CBCT scans to bone and soft tissues ranges from 0.7 to 1.1 cGy and from 0.03 to 0.3 cGy, respectively. The dose resulting from Thorax scans on the chest to bone and soft tissues ranges from 1.1 to 1.8 cGy and from 0.3 to 0.6 cGy, respectively. The dose resulting from Pelvis scans on the abdomen to bone and soft tissues range from 3.2 to 4.2 cGy and from 1.2 to 2.2 cGy, respectively. The out-of-field doses to OAR are sensitive to the distance between the treated target and the OAR. For a typical Head-and-Neck IMRT/VMAT treatment the out-of-field doses to eyes are 1–3% of the target dose, or 2–6 cGy per fraction. Conclusion: The imaging doses to OAR are predictable based on the imaging protocols used when OARs are within the imaged volume and can be estimated and accounted for by using tabulated values. The unintended out-of-field doses are proportional to the target dose, strongly depend on the distance between the treated target and OAR, and are generally higher comparing to the imaging dose. This work was partially supported by Varian research grant VUMC40590.

  17. EECBG Program Notice 10-020B, Guidance for Energy Efficiency and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conservation Block Grant Recipients on Closeout Procedures | Department of Energy B, Guidance for Energy Efficiency and Conservation Block Grant Recipients on Closeout Procedures EECBG Program Notice 10-020B, Guidance for Energy Efficiency and Conservation Block Grant Recipients on Closeout Procedures U.S. Department of Energy Weatherization and Intergovernmental Program guidance for the Energy Efficiency and Conservation Block Grant Program on closeout procedures, revised January 8, 2013.

  18. Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint

    SciTech Connect (OSTI)

    Rugh, J.

    2010-02-01

    A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

  19. Test procedure for use of the shear vane in tanks 103-SY, 103-AN, and 103-AW

    SciTech Connect (OSTI)

    LeClair, M.D.; Waters, E.

    1995-01-01

    This is a record copy of a test procedure for application of the full-scale shear vane to underground waste tanks at Hanford. The introduction of the report provides background information on the development and proof-testing of the shear vane, as well as information about its current location. The document was originally prepared in 1988, and the work as shelved temporarily for lack of funds. Activities to utilize the shear vane will be expedited by use of this information.

  20. WPN 16-4: Weatherization Assistance Program Monitoring Guidance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 4: Weatherization Assistance Program Monitoring Guidance WPN 16-4: Weatherization Assistance Program Monitoring Guidance Effective: Dec. 17, 2015 To issue updated monitoring policy and procedures for the Weatherization Assistance Program (WAP). WPN 16-4: Weatherization Assistance Program Monitoring Guidance (422.19 KB) Grantee PM Checklist (519.85 KB) Subgrantee Checklist (254.08 KB) Grantee Programmatic Management Changes (614.68 KB) Subgrantee Checklist Changes (433.97

  1. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect (OSTI)

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  2. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect (OSTI)

    Judkoff, Ron

    2010-08-01

    This report documents the initial Phase 1 test process for testing the reliability of software models that predict retrofit energy savings of existing homes, including their associated calibration methods.

  3. State Energy Program and Energy Efficiency and Conservation Block Grant Program Guidance 13-001: Guidance for Returning Interest Earned

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STATE ENERGY PROGRAM NOTICE 13-001 EECBG PROGRAM NOTICE 13-001 EFFECTIVE DATE: MARCH 21, 2013 SUBJECT: GUIDANCE FOR RETURNING INTEREST EARNED PURPOSE To provide an overview to the Department of Energy' s (DOE) State Energy Program (SEP) and Energy Efficiency and Conservation Block Grant (EECBG) Program prime recipients (hereafter refe1Ted to as grantees) on guidance for the procedural requirements of returning interest earned on advanced Federal funds . This guidance does not create new

  4. Guidance manual for hazardous waste incinerator permits. Final report

    SciTech Connect (OSTI)

    Not Available

    1983-07-01

    The manual provides guidance to the permit writer for designating facility - specific operating conditions necessary to comply with the RCRA standards for hazardous waste incinerators. Each section of the incineration regulation is addressed, including: waste analysis, designation of principal organic hazardous constituents and requirements for operation, inspection and monitoring. Guidance is also provided for evaluating incinerator performance data and trial burn procedures.

  5. Site Transition Plan Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Guidance Site Transition Plan Guidance Site Transition Plan Guidance PDF icon Site Transition Plan Guidance More Documents & Publications Development of Site Transition Plan, ...

  6. Guidance & Opinions | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    DOE Facilities and by DOE Contractors Opinion on Contractor Participation in the Federal Hiring Process Guidance on Inherently Governmental Functions Guidance on Electric Vehicle...

  7. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  8. ISSUANCE 2015-06-25: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

  9. Enforcement Guidance Supplement 00-03: Specific Issues on Applicabilit...

    Office of Environmental Management (EM)

    00-03: Specific Issues on Applicability of 10 CFR 830 Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure...

  10. Safety Planning Guidance for Hydrogen and Fuel Cell Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety Planning Guidance for Hydrogen and Fuel Cell Projects April 2010 U.S. Department of Energy Fuel Cell Technologies Program Table of Contents A. Introduction.................................................................................................................... 1 B. Requirements and Procedures....................................................................2 C. The Safety Plan

  11. Enforcement Guidance Supplement 01-02: Management and Independent Assessment

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998,provides the opportunity for the Office of Price-Anderson Enforcement (OE) toperiodically issue clarifying guidance...

  12. Commissioning Guidance for ESPCs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMISSIONING GUIDANCE FOR ESPCs CONTENTS Introduction ................................................................................................................................................... 1 Overview of Commissioning in the ESPC Process ...................................................................................... 2 Summary of Roles And Responsibilities In ESPC Project Commissioning ................................................. 3 Key Elements of Commissioning

  13. Selected Guidance & Requirements

    Broader source: Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  14. Buy American Program Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROJECTS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 AND ADMINISTERED BY THE OFFICE OF ENERGY EFFICIENCY AND RENEWABLE ENERGY NOTICE EFFECTIVE DATE: December 17, 2009 SUBJECT: GUIDANCE ON THE BUY AMERICAN PROVISIONS AS APPLIED TO ENERGY EFFICIENCY AND RENEWABLE ENERGY PROJECTS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 AND ADMINISTERED BY THE OFFICE OF ENERGY EFFICIENCY AND RENEWABLE ENERGY PURPOSE: Provides guidance to financial assistance recipients regarding

  15. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2003-04-30

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the WIPP management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  16. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-04

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT Shipping Package, and directly related components. This document complies with the minimum requirements as specified in TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event there is a conflict between this document and the SARP or C of C, the SARP and/or C of C shall govern. C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SAR P charges the WIPP Management and Operation (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize these operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  19. Accuracy of the European solar water heater test procedure. Part 2: Prediction of long-term performance

    SciTech Connect (OSTI)

    Rabl, A. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    This paper continues the evaluation of the European test procedure for solar water heaters, by considering what consequences the errors of the parameters (derived in Part 1, the companion paper) will have for the prediction of the long-term performance. A simple criterion is derived for the required length of the test period, as a function of climatic variables and desired accuracy of the long-term performance prediction. Typically a duration of 10 to 50 days will suffice. Since the actual conditions during a test cannot be foreseen, it will be more efficient to calculate the error of the long-term performance prediction on line at the end of each test day and terminate the series whenever acceptable accuracy is reached.

  20. HUMAN FACTORS GUIDANCE FOR CONTROL ROOM EVALUATION

    SciTech Connect (OSTI)

    OHARA,J.; BROWN,W.; STUBLER,W.; HIGGINS,J.; WACHTEL,J.; PERSENSKY,J.J.

    2000-07-30

    The Human-System Interface Design Review Guideline (NUREG-0700, Revision 1) was developed by the US Nuclear Regulatory Commission (NRC) to provide human factors guidance as a basis for the review of advanced human-system interface technologies. The guidance consists of three components: design review procedures, human factors engineering guidelines, and a software application to provide design review support called the ``Design Review Guideline.'' Since it was published in June 1996, Rev. 1 to NUREG-0700 has been used successfully by NRC staff, contractors and nuclear industry organizations, as well as by interested organizations outside the nuclear industry. The NRC has committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool in the face of emerging and rapidly changing technology. This paper addresses the current research to update of NUREG-0700 based on the substantial work that has taken place since the publication of Revision 1.

  1. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-02-28

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.

  2. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2008-09-11

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  3. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2009-06-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  4. National Environmental Policy Act guidance: A model process

    SciTech Connect (OSTI)

    Angle, B.M.; Lockhart, V.A.T.; Sema, B.; Tuott, L.C.; Irving, J.S.

    1995-04-01

    The ``Model National Environmental Policy Act (NEPA) Process`` includes: References to regulations, guidance documents, and plans; training programs; procedures; and computer databases. Legislative Acts and reference documents from Congress, US Department of Energy, and Lockheed Idaho Technologies Company provide the bases for conducting NEPA at the Idaho National Engineering Laboratory (INEL). Lockheed Idaho Technologies Company (LITCO) NEPA / Permitting Department, the Contractor Environmental Organization (CEO) is responsible for developing and maintaining LITCO NEPA and permitting policies, guidance, and procedures. The CEO develops procedures to conduct environmental evaluations based on NEPA, Council on Environmental Quality (CEQ) regulations, and DOE guidance. This procedure includes preparation or support of environmental checklists, categorical exclusion determinations, environmental assessment determinations, environmental assessments, and environmental impact statements. In addition, the CEO uses this information to train personnel conducting environmental evaluations at the INEL. Streamlining these procedures fosters efficient use of resources, quality documents, and better decisions on proposed actions.

  5. ARM - Social Media Guidance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CenterSocial Media Guidance Media Contact Hanna Goss hanna-dot-goss-at-pnnl-dot-gov @armnewsteam Field Notes Blog Topics Field Notes117 AGU 3 AMIE 10 ARM Aerial Facility 2 ARM Mobile Facility 1 7 ARM Mobile Facility 2 47 ARM Mobile Facility 3 1 BAECC 1 BBOP 4 CARES 1 Data Quality Office 2 ENA 2 GOAMAZON 7 HI-SCALE 4 LASIC 3 MAGIC 15 MC3E 17 PECAN 3 SGP 8 STORMVEX 29 TCAP 3 Search News Search Blog News Center All Categories What's this? Social Media Guidance News Center All Categories Features

  6. Section 106 Archaeology Guidance

    Broader source: Energy.gov [DOE]

    The Advisory Council on Historic Preservation's Section 106 guidance is designed to assist federal agencies in making effective management decisions about archaeological resources in completing the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). This guidance highlights the decision-making role of the federal agency in the Section 106 process. It is also designed for use by State and Tribal Historic Preservation Officers, Indian tribes, Native Hawaiian organizations, and cultural resource management professionals when assisting federal agencies to meet their responsibilities under Section 106.

  7. A rating procedure for solar domestic hot water systems based on ASHRAE-95 test results

    SciTech Connect (OSTI)

    Minnerly, B.V.; Klein, S.A.; Beckman, W.A. )

    1991-01-01

    A rating method for solar domestic hot water (SDHW) systems is presented that provides site-specific annual performance estimates based on ASHRAE-95 test results. An overall loss and overall gain coefficient are estimated by lumping the entire thermal behavior of the actual system exhibited during the ASHRAE-95 test into the collector parameters of a simplified system model. The performance of the simplified model can then be predicted using either the F-chart or TRNSYS and presented as an estimate of the annual performance of the actual system. Experimental performance measurements taken from relevant literature as well as extensive simulations, indicate that this method is capable of predicting the annual performance of a wide range of SDHW system types to within 5%, independent of location.

  8. 2014-10-14 Issuance: Test Procedures and Energy Conservation Standards for Residential Solar Water Heaters; Request for Information

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  9. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplemental Notice of Proposed Rulemaking regarding Test Procedures for Integrated Light-Emitting Diode Lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  10. 2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  11. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  12. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2007-12-13

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  13. CH Packaging Program Guidance

    SciTech Connect (OSTI)

    None, None

    2006-04-25

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package TransporterModel II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant| (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations(CFR) §71.8. Any time a user suspects or has indications that the conditions ofapproval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are

  14. Guidance and Opinions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance and Opinions Guidance and Opinions Contractor Relations Guidance on Accessing Contractor and Subcontractor Employment Records Arbitration Guidance for Management and Operating Contractors Guidance on Meetings with Union Officials Political Activity at DOE Facilities and by DOE Contractors Opinion on Contractor Participation in the Federal Hiring Process Guidance on Inherently Governmental Functions Guidance on Electric Vehicle Recharging Stations Safety Regulations Interpretations

  15. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect (OSTI)

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  16. Guidance for EPAct 2005 Section 242 Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for EPAct 2005 Section 242 Program I. Purpose In the Energy Policy Act of 2005 (EPAct 2005; Public Law 109-58) Congress established a new program to support the expansion of hydropower energy development at existing dams and impoundments through an incentive payment procedure. Under section 242 of EPAct 2005, the Secretary of Energy is directed to provide incentive payments to the owner or authorized operator of qualified hydroelectric facilities for electric energy generated and sold

  17. United States Forest Service - Forest Service NEPA Procedures...

    Open Energy Info (EERE)

    and Guidance Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service NEPA Procedures and Guidance Abstract This...

  18. High Performance and Sustainable Buildings Guidance | Department...

    Office of Environmental Management (EM)

    High Performance and Sustainable Buildings Guidance High Performance and Sustainable Buildings Guidance High Performance and Sustainable Buildings Guidance (192.76 KB) More ...

  19. General Privacy Act Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Privacy Act Guidance General Privacy Act Guidance This document provides information on Privacy Act Requests and responses to general FAQs PDF icon General Privacy Act Guidance ...

  20. A guide to CERCLA site assessment. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Pocket Guide is a condensed version of information provided in three EPA documents: Guidance for Performing Preliminary Assessments Under CERCLA, Guidance for Performing Site Inspections Under CERCLA, and Hazard Ranking System Guidance Manual. Additionally the guide provides a DOE perspective on site assessment issues and information on the Federal Agency Hazardous Waste Compliance Docket as well as data sources for DOE site assessments. The guide is intended to present this information in a simple, portable, and direct manner that will allow the user to effectively focus on those aspects of the site assessment process of interest. The guide is not intended as a substitute for the three EPA guidance documents mentioned previously. DOE investigators should be thoroughly familiar with the EPA guidance before conducting site assessments. Use this pocketguide as an overview of procedures and requirements and as a field guide.

  1. NEPA Contracting Reform Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    defining early what contractors should accomplish < establishing contracts ahead of time < minimizing cost while maintaining quality by * maximizing competition and use of incentives * using past performance information in awarding work * managing the NEPA process as a project This guidance provides: < model statements of work < information on contract types and incentives < direction on effective NEPA contract management by the NEPA Document Manager < a system for measuring

  2. Environmental guidance regulatory bulletin

    SciTech Connect (OSTI)

    1997-01-31

    This document describes the background on expanding public participation in the Resource Conservation and Recovery Act and DOE`s response. The bulletin also describes the changes made by the final rule to existing regulations, guidance provided by EPA in the preamble and in the revised RCRA Public Participation Manual, the relationship between public participation and environmental justice, and DOE`s recent public participation and environmental justice initiatives.

  3. 2014-03-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for packaged terminal air conditioners and packaged terminal heat pumps, as issued by the Deputy Assistant Secretary on March 6, 2014.

  4. 2016 Guiding Principles: Updates, Guidance, and Solutions (Providence, RI)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Guiding Principles: Updates, Guidance, and Solutions (Providence, RI) 2016 Guiding Principles: Updates, Guidance, and Solutions (Providence, RI) August 8, 2016 1:00PM to 5:00PM EDT INTERMEDIATE LEVEL (201) This workshop will provide an overview of the 2016 Guiding Principles and cover all the new requirement and definition updates, as well as review the significant changes to the scoring and compliance procedures. Registration is open to federal and private sector

  5. Interim Guidance on DOE Personal Property Foreign Transactions

    Broader source: Energy.gov [DOE]

    The attached Acquisition Letter provides interim direction and procedural guidance to DOE and NNSA on proper protocol for personal property transactions executed with foreign entities, to include property title transfers, loans and abandonments and pertains to personal property in the hand of the Federal government, contractor or a third party. Direction and guidance is specific to accountable personal property, as defined in DOE Order 580.1. Guidance in this Acquisition Letter shall be followed until DOE Order 580.1 is updated to include foreign transactions.

  6. A Discussion of Procedures and Equipment for the Comprehensive Test Ban Treaty On-Site Inspection Environmental Sampling and Analysis

    SciTech Connect (OSTI)

    Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.; Seifert, Carolyn E.; Friese, Judah I.; Miley, Harry S.; Bowyer, Ted W.; Hanlen, Richard C.; Onishi, Yasuo; Hayes, James C.; Wigmosta, Mark S.

    2011-02-01

    This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of the sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.

  7. Energy Sector Cybersecurity Framework Implementation Guidance

    Broader source: Energy.gov (indexed) [DOE]

    FOR PUBLIC COMMENT SEPTEMBER, 2014 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE Energy Sector Cybersecurity Framework Implementation Guidance Table of Contents...

  8. Project Management Policy & Guidance Documents | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy & Guidance Documents Project Management Policy & Guidance Documents << Return to Directives & Documents | Proceed to Publications & Documents >> Document Type Function

  9. Appliance Standards Guidance and Frequently Asked Questions

    Office of Environmental Management (EM)

    Implementation, Certification, & Enforcement Rulemakings & Notices Further Guidance ENERGY STAR Building Energy Codes Appliance Standards Guidance and Frequently Asked...

  10. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of chromium-nickel steel to nickel-copper

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2602-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of 300 series Cr-Ni steels (P-8-1) to nickel-copper N04400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  11. Welding procedure specification: gas tungsten arc welding of nickel-copper to nickel-chromium-iron. Supplement 1. Records of procedure qualification tests

    SciTech Connect (OSTI)

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2303-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper N04400 (P-42) to nickel-chromium-iron N06600 (P-43), in thickness range of 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  12. Guidance | Department of Energy

    Energy Savers [EERE]

    Records Management Applications Design Criteria Standards NARA Bulletins Procedures and Instructions Records Management Handbook Web DigitalGov Required Web Content and Links

  13. Guidance Systems Division ,

    Office of Legacy Management (LM)

    Oockec No. 10-0772 22 OCT 1981 Bcndlx CorporaLion ' Guidance Systems Division , ATTN: Mr. Wf 11 la,,, Hnrr,,or Manngar, PlanL Englne0rtny Teterboro, New Jersey 07608 uwm STATES NUCLEAll I-IEOULATOIJY COMMISSION REGION i 631 PARK A"LH"I KIN0 OF PR"ISIA. PCNNIVLVANIA ID40' Gentlemen: Subject: Inspectfon 81-15 _ "-- .,; .z .;; Thts refers to the closeout safety \nspectlon conducted by Ms. M. Campbell of this office on August 27, 1961, of activities formerly authorized by NRC

  14. Idaho National Laboratory Lead or Lead-Bismuth Eutectic (LBE) Test Facility - R&D Requirements, Design Criteria, Design Concept, and Concept Guidance

    SciTech Connect (OSTI)

    Eric P. Loewen; Paul Demkowicz

    2005-05-01

    The Idaho National Laboratory Lead-Bismuth Eutectic Test Facility will advance the state of nuclear technology relative to heavy-metal coolants (primarily Pb and Pb-Bi), thereby allowing the U.S. to maintain the pre-eminent position in overseas markets and a future domestic market. The end results will be a better qualitative understanding and quantitative measure of the thermal physics and chemistry conditions in the molten metal systems for varied flow conditions (single and multiphase), flow regime transitions, heat input methods, pumping requirements for varied conditions and geometries, and corrosion performance. Furthering INL knowledge in these areas is crucial to sustaining a competitive global position. This fundamental heavy-metal research supports the National Energy Policy Development Group’s stated need for energy systems to support electrical generation.1 The project will also assist the Department of Energy in achieving goals outlined in the Nuclear Energy Research Advisory Committee Long Term Nuclear Technology Research and Development Plan,2 the Generation IV Roadmap for Lead Fast Reactor development, and Advanced Fuel Cycle Initiative research and development. This multi-unit Lead-Bismuth Eutectic Test Facility with its flexible and reconfigurable apparatus will maintain and extend the U.S. nuclear knowledge base, while educating young scientists and engineers. The uniqueness of the Lead-Bismuth Eutectic Test Facility is its integrated Pool Unit and Storage Unit. This combination will support large-scale investigation of structural and fuel cladding material compatibility issues with heavy-metal coolants, oxygen chemistry control, and thermal hydraulic physics properties. Its ability to reconfigure flow conditions and piping configurations to more accurately approximate prototypical reactor designs will provide a key resource for Lead Fast Reactor research and development. The other principal elements of the Lead-Bismuth Eutectic Test Facility

  15. Guidance Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance Documents Guidance Documents Guidance documents for the financial opportunities process. Recipient's Guide to Negotiation with EERE (281.39 KB) DOE Guide to Financial Assistance (539.53 KB) DOE Merit Review Guide (223.37 KB) Technology Readiness Levels (TRLs) (255.77 KB) Generally Unallowable Costs (256.08 KB) Catalog of Federal Domestic Assistance Numbers (CFDA) (253.83 KB) More Documents & Publications Financial Assistance Guide (2013) Revised Guide for Financial Assistance

  16. EECBG Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency And Conservation Block Grant Grantees On Financing Programs EECBG Program Notice 09-002B - Guidance for Energy Efficiency and Conservation Block Grant Grantees on ...

  17. Handicapped Parking Guidance

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Headquarters Handicapped Parking Procedures It is the policy of the Department of Energy (DOE) that its parking facility be operated in a manner responsive to the needs of the Department, and for the maximum benefit of its employees. Individuals with temporary or permanent mobility impairment who, because of their condition, have a need to request a handicapped parking permit for the Forrestal or Germantown facilities, should use the following procedures

  18. Prototype Programmatic Agreement Guidance

    Broader source: Energy.gov [DOE]

    Prototype programmatic agreements are a type of program alternative that the Advisory Council on Historic Preservation (ACHP) can designate to assist federal agencies in their efforts to comply with the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). Prototype agreements may be used for the same type of program or undertaking in more than one case or area, and typically establish efficiencies and protocols for implementing these undertakings. This ACHP guidance describes the process for developing prototype agreements, the involvement of interested parties, and other important components to be considered when exploring the use of a prototype agreement as a program alternative.

  19. Security Policy, Guidance & Reports

    Broader source: Energy.gov [DOE]

    The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive. The Office is responsible for the principal personnel security information processing activities of the Department and personnel security administrative review process. The Office of Headquarters Security Operations provides oversight and direction support to all Headquarters security operations to include physical protection, information security, personnel security, and guidance to the Headquarters Security Officers (HSO).

  20. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards & Labeling Programs for Copy Machines, External Power Supplies, LED Displays, Residential Gas Cooktops and Televisions

    SciTech Connect (OSTI)

    Zheng, Nina; Zhou, Nan; Fridley, David

    2012-03-01

    This report presents a technical review of international minimum energy performance standards (MEPS), voluntary and mandatory energy efficiency labels and test procedures for five products being considered for new or revised MEPS in China: copy machines, external power supply, LED displays, residential gas cooktops and flat-screen televisions. For each product, an overview of the scope of existing international standards and labeling programs, energy values and energy performance metrics and description and detailed summary table of criteria and procedures in major test standards are presented.

  1. Enforcement Guidance Supplement 02-01: Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors.

  2. Enforcement Guidance Supplement 02-01:Enforcement Position Relative to 10 CFR 835 Bioassay Accreditation

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors.

  3. 2015 ASER Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ASER Guidance 2015 ASER Guidance Guidance for Preparation of the 2015 Department of Energy Annual Site Environmental Reports (ASER); ASER Formats 2015 ASER Guidance (504.85 KB) More Documents & Publications Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports ERAD 2014 Presentations Portsmouth Annual Site Environmental Reports

  4. WPN 12-5: Updated Weatherization Assistance Program Monitoring Guidance

    Broader source: Energy.gov [DOE]

    To issue the updated monitoring policy and procedures for the Weatherization Assistance Program (WAP) for both annual Appropriated awards and for the Recovery Act awards, which includes the Sustainable Energy Resources for Consumers (SERC) Awards. This updated Guidance excludes the Weatherization Innovative Pilot Program (WIPP) and Weatherization Training Centers (WTC).

  5. WPN 11-6 A: Supplemental Health and Safety Guidance

    Broader source: Energy.gov [DOE]

    To update and provide additional time for implementation of WPN 11-6 as part of the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP). This guidance also provides direction to Grantees as they develop their health and safety plans and procedures.

  6. Financial Policy and Procedures for Reimbursable Work

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-08-15

    The directive establishes Department-wide financial policy and procedural guidance applicable to performing reimbursable work for other Federal agencies and with non-Federal Government entities, including foreign and commercial entities, State, and political subdivisions.

  7. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues.

  8. 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding alternative efficiency determination methods and test procedures for walk-in coolers and walk-in freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  9. Site Transition Guidance | Department of Energy

    Office of Environmental Management (EM)

    Guidance Site Transition Guidance On June 16, 2004, Michael W. Owen, Director, Office of Legacy Management (LM) and Jessie H. Roberson, Assistant Secretary, Office of Environmental ...

  10. Interim Guidance Regarding Limitations on CERCLA Liability |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Inner-Office Memorandum: Interim Guidance Regarding Limitations on CERCLA LiabilityPermitting...

  11. Utah Antidegradation Review Implementation Guidance | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Utah Antidegradation Review Implementation GuidancePermittingRegulatory...

  12. Guidance on Incorporating EPA's Pollution Prevention Strategy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Review Process (EPA, 1993) Guidance on Incorporating EPA's Pollution Prevention Strategy into the Environmental Review Process (EPA, 1993) The guidance discusses ...

  13. Amended Environmental Impact Statement Filing System Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact Statement Filing System Guidance (EPA, 2012) Amended Environmental Impact ...

  14. Renewable Energy Financial Instruments Guidance Tool (REFINe...

    Open Energy Info (EERE)

    Guidance Tool (REFINe) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Financial Instruments Guidance Tool (REFINe) Focus Area: Renewable Energy...

  15. Security and Cyber Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security and Cyber Guidance Security and Cyber Guidance Appraisal Process Guides Security Evaluations Appraisal Process Guide - April 2008 Cyber Security Evaluations Appraisal ...

  16. Request for Proposal Guidance | Department of Energy

    Energy Savers [EERE]

    Request for Proposal Guidance Request for Proposal Guidance When purchasing plug-in electric vehicle charging stations as part of your workplace charging program, your organization ...

  17. Nuclear Safety Policy, Guidance & Reports

    Broader source: Energy.gov [DOE]

    The Office of Nuclear Safety establishes and maintains nuclear safety policy, requirements, and guidance including policy and requirements relating to hazard and accident analysis, facility design and operation, and Quality Assurance.

  18. DOE Guidance-Category Rating

    Broader source: Energy.gov (indexed) [DOE]

    August 27, 2010 MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SARA"iJ. Boku1, DIRECToR OF HUMAN CTAL MANAGEMENT SUBJECT: GUIDANCE MEMORANDUM 10 CATEGORY RATING The purpose of ...

  19. Implemenation Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Earned Value Management » Implemenation Guidance Implemenation Guidance Earned Value Management (EVM) is a systematic approach to the integration and measurement of cost, schedule, and technical (scope) accomplishments on a project or task. Following established implementation guidelines and conducting periodic surveillance of implemented EVM System (EVMS) will ensure that both the government and contractors have the ability to examine detailed schedule information, critical program

  20. Policy Guidance Memorandum #37 Procedures for Excepted Service...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (424.1 KB) Responsible Contacts Tonya Mackey Director, Executive Resources Division E-mail tonya.mackey@hq.doe.gov Phone 202-586-2195 More Documents & Publications Excepted ...

  1. POLICY GUIDANCE MEMORANDUM #35 Procedures for Compliance with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Responsible Contacts Jennifer Ackerman Director, Human Capital Policy E-mail jennifer.ackerman@hq.doe.gov Phone (202) 586-3860; More Documents & Publications Inspection Report: ...

  2. GUIDANCE MEMORANDUM # 31 PROCEDURES FOR REGULARIZING ILLEGAL APPOINTMENT .pdf

    Office of Environmental Management (EM)

    GSA and DOE Seek Innovative Building Technologies GSA and DOE Seek Innovative Building Technologies October 14, 2015 - 2:33pm Addthis GSA and DOE Seek Innovative Building Technologies To submit your technology, complete our request for information (RFI) by Friday, December 11, 2015. GSA's Green Proving Ground (GPG) program and DOE's High Impact Technology (HIT) Catalyst have issued a joint Request for Information calling for innovative emerging building technologies that can cost-effectively

  3. POLICY GUIDANCE MEMORANDUM #31- Procedures for Regularizing Illegal Appointments

    Broader source: Energy.gov [DOE]

    As part of the Department’s ongoing effort to ensure the integrity of merit system principles (§5 USC 2301(b)) and to prevent the appearance of, or violation of any of the prohibited personnel...

  4. Guidance for evaluation of operational emergency plans

    SciTech Connect (OSTI)

    1995-03-01

    The purpose of this document is to provide guidance for development of emergency plans for the USDOE Office of Defense Programs, Office of Energy Research, and Office of Environmental Management facilities. It gathers emergency planning policy and guidance from applicable federal regulations, DOE Orders and related guidance documents. This material, along with recommended good practices, is presented as a checklist against which emergency plans can be reviewed by DOE Headquarters. The Office of Emergency Response (DP-23), Office of Environment, Safety and Health Technical Support (ER-8), and Office of Transportation, Emergency Management and Analytical Services (EM-26) will use this checklist to evaluate plans submitted by DP, ER, and EM field elements. The scope of this document encompasses plans for operational emergencies at DOE facilities, both nuclear and non-nuclear. Operational emergencies, as defined in Attachment 2 to DOE Order 5500.1B (April 30, 1991) are ``significant accidents, incidents, events, or natural phenomena which seriously degrade the safety or security of DOE facilities. Operational Emergencies apply to DOE reactors and other DOE facilities (nuclear and non-nuclear) involved with hazardous materials; DOE-controlled nuclear weapons, components, or test devices; DOE safeguards and security events; and transportation accidents involving hazardous materials under DOE control.``

  5. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

  6. ISSUANCE 2015-06-30: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

  7. ISSUANCE 2014-12-23: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

  8. ISSUANCE 2015-03-27: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

  9. QA in Design Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Design Guidance QA in Design Guidance This Department of Energy (DOE) Environmental Management (EM) guidance document is approved for use by all DOE EM organizational units and contractors performing work for EM. QA in Design Guidance (103.15 KB) More Documents & Publications Audit Report: IG-0863 Line Management Understanding of QA and Oversight Requirements Flowdown and Graded Approach to QA

  10. CMI Guidance Documents | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CMI Guidance Documents This page has links to pdf versions of CMI Guidance Documents for CMI staff: Publication process flow chart Acknowledgement text Foreign travel Press releases IP protection The Microsoft Word versions of these, and additional guidance documents, are available in the data storage server. Tags: guidance document

  11. Hazardous Materials Incident Response Procedure

    Broader source: Energy.gov [DOE]

    The purpose of this procedure is to provide guidance for developing an emergency response plan, as outlined in OSHA’s 29 CFR 1910.120(q), for facility response.  This model has been adopted and...

  12. Enforcement Guidance Supplement 01-02: Management and Independent Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGSs), which provide information or recommendations only and impose no requirements or actions on DOE contractors. DOE enforcement activities to date have indicated the need for improvement in contractor compliance with the Management and Independent Assessment (M&IA) requirements of 10 CFR 830.122. This EGS signals an increased emphasis by OE in this area, and describes the general approach that will be used by OE in evaluating compliance of nuclear-safety related M&IA Programs.

  13. Buy American Program Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buy American Program Guidance Buy American Program Guidance Provides information on the December 17, 2009, Buy American Guidance eere_program_guidance_buy_american_121709.pdf (122 KB) More Documents & Publications Projects Funded by the American Recovery and Reinvestment Act of 2009 and Administered by the Office of Energy Efficiency and Renewable Energy (EERE) Notice Buy American Guidance Documents FAQs Docs for the Buy American Provision

  14. HFE Process Guidance and Standards for potential application to updating NRC guidance

    SciTech Connect (OSTI)

    Jacques Hugo; J. J. Persensky

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staff’s HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

  15. Information architecture. Volume 3: Guidance

    SciTech Connect (OSTI)

    1997-04-01

    The purpose of this document, as presented in Volume 1, The Foundations, is to assist the Department of Energy (DOE) in developing and promulgating information architecture guidance. This guidance is aimed at increasing the development of information architecture as a Departmentwide management best practice. This document describes departmental information architecture principles and minimum design characteristics for systems and infrastructures within the DOE Information Architecture Conceptual Model, and establishes a Departmentwide standards-based architecture program. The publication of this document fulfills the commitment to address guiding principles, promote standard architectural practices, and provide technical guidance. This document guides the transition from the baseline or defacto Departmental architecture through approved information management program plans and budgets to the future vision architecture. This document also represents another major step toward establishing a well-organized, logical foundation for the DOE information architecture.

  16. Microsoft Word - Interpretive Guidance FINAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 2, 2011 INTERPRETIVE GUIDANCE ON THE REQUIREMENTS OF 10 C.F.R. § 205.322 This guidance is intended to clarify the Department of Energy (DOE)'s interpretation of 10 C.F.R. § 205.322, which sets forth the contents of an application for a Presidential permit issued by DOE under Executive Order (E.O.) 10485, as amended by E.O. 12038. Anyone seeking to construct, operate, maintain, or connect an electric transmission facility crossing the borders of the United States must first obtain a

  17. DOE Audit Guidance for For-Profit Financial Assistance Awards...

    Energy Savers [EERE]

    The audits of programs performed under CFDA number 81.135 should require a special test... includes generic audit objectives and suggested audit procedures to test internal control. ...

  18. Policy Standards, Guidance and Statutes

    Broader source: Energy.gov [DOE]

    Policy Guidance and Statutes, DOE Standards, STD, Atomic Energy Act, Table, Draft DOE P, American Indian Religiuos Freedom, CERCLA, RCRA, Clean Air ACt, Clean Water Act, Emergency Planing and Community, Federal Environmental Laws, Surface Contamination Guidelines, DOE STD-1196-2011, Derived Concentration Technical Standard, ALARA, 0173T

  19. Enforcement Guidance Supplement 03-02: Revision to Occurrence Report-Based Noncompliance Tracking System Reporting Criteria

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. OE typically issues such guidance in the form of Enforcement Guidance Supplements (EGS), which provide information or recommendations only and impose no requirements or actions on Department of Energy (DOE) contractors.

  20. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect (OSTI)

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  1. Privacy Impact Assessment Template and Guidance

    Broader source: Energy.gov [DOE]

    Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting an...

  2. NEPA Guidance and Requirements- Search Index

    Office of Energy Efficiency and Renewable Energy (EERE)

    The NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use.

  3. 2014-05-05 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding alternative efficiency determination methods and test procedures for walk-in coolers and walk-in freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  4. Wetlands, Floodplains, and Other Water Resources Guidance and...

    Office of Environmental Management (EM)

    Wetlands, Floodplains, and Other Water Resources Guidance and Requirements Wetlands, Floodplains, and Other Water Resources Guidance and Requirements Guidance Revised Guidelines ...

  5. 2012 Federal Real Property Council Reporting Guidance | Department...

    Broader source: Energy.gov (indexed) [DOE]

    2012 Data Dictionary FINAL.pdf More Documents & Publications 2015 Federal Real Property Council Reporting Guidance FRPC User Guidance -for FY2006 FRPC User Guidance -for FY2006...

  6. Idaho Section 401 Certification Guidance | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Idaho Section 401 Certification GuidancePermittingRegulatory GuidanceGuide...

  7. Federal Building Energy Use Benchmarking Guidance, August 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Use Benchmarking Guidance, August 2014 Update Federal Building Energy Use Benchmarking Guidance, August 2014 Update Guidance describes the Energy Independence and Security ...

  8. Council on Environmental Quality (CEQ) NEPA Guidance and Requirements...

    Office of Environmental Management (EM)

    Council on Environmental Quality (CEQ) NEPA Guidance and Requirements Council on Environmental Quality (CEQ) NEPA Guidance and Requirements Also see CEQ's NEPA guidance page: ...

  9. February2GuidanceMemorandum.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February2GuidanceMemorandum.pdf February2GuidanceMemorandum.pdf PDF icon February2GuidanceMemorandum.pdf More Documents & Publications Memorandum of Understanding (MOU) POLICY...

  10. Multiyear Program Plan Template - Phase II Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multiyear Program Plan Template - Phase II Guidance Multiyear Program Plan Template - Phase II Guidance EERE template and guidance for program managers to develop multiyear plans, ...

  11. Guidance for Procurement Officials | Department of Energy

    Office of Environmental Management (EM)

    Guidance for Procurement Officials Acquisition Regulations Federal Acquisition Regulation (FAR) Department of Energy Acquisition Regulation (DEAR) Acquisition Policy Acquisition ...

  12. WPN 06-1: 2006 Grant Guidance

    Broader source: Energy.gov [DOE]

    To issue grant guidance and management information for the Low-Income Weatherization Assistance Program (Weatherization) for Program Year 2006.

  13. Internal Controls Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Internal Controls Guidance Internal Controls Guidance Guidance required to be implemented by Departmental elements to meet the requirements of the Federal Managers' Financial Integrity Act (FMFIA), as described in Office of Management and Budget (OMB) Circular A-123, Management's Responsibility for Internal Control. This guidance provides instructions for conducting internal controls evaluations and help ensure the Secretary's annual Statement of Assurance is accurate and adequately supported.

  14. DOE Releases Federal Building Metering Guidance

    Broader source: Energy.gov [DOE]

    The guidance requires federal agencies to review, revise, and submit to FEMP its metering implementation plan within one year.

  15. FTCP Assessment Guidance and Criteria

    Broader source: Energy.gov [DOE]

    This document establishes the guidance and criteria for conducting internal and independent Federal Technical Capability Assessments within the Department. The requirements of this document are applicable to those organizations having safety responsibilities for defense nuclear facilities. This includes both headquarters and field organizations. Regardless of the type of assessment conducted, the objectives and criteria within this document are used as a basis for the assessment. Use of consistent objectives and criteria is necessary to establish baselines and to track and trend performance.

  16. Policies and Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Communication & Engagement » EM SSAB » Policies and Procedures Policies and Procedures The purpose of this document is to provide guidance regarding the operation of the Environmental Management Site-Specific Advisory Board (EM SSAB or Board). Policies and Procedures (406.85 KB) More Documents & Publications Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards DOE Manual - ADVISORY COMMITTEE MANAGEMENT PROGRAM GSA Federal

  17. Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EH-Enforcement) to issue clarifying guidance in a timely manner with respect to the processes used in enforcement activities. This enforcement guidance focuses on several issues related to applicability of 10 CFR 830 that have been observed in enforcement and investigation activities.

  18. Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

    Office of Environmental Management (EM)

    10 CFR 830 | Department of Energy 00-03: Specific Issues on Applicability of 10 CFR 830 Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EHEnforcement) to issue clarifying guidance in a timely manner with respect to the

  19. DOE Issues Guidance for "Other Transactions" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for "Other Transactions" DOE Issues Guidance for "Other Transactions" November 15, 2005 - 12:42pm Addthis Provides Opportunity for Increased Industry Research Partnerships WASHINGTON, DC - On November 7, 2005, the Department of Energy (DOE) issued an interim final rule for the establishment of policies and procedures for a new "other transaction" authority. This authority allows DOE to remove barriers to commercial firms' participation in some of DOE's

  20. Enforcement Guidance Supplement 98-02: DOE Enforcement Activities where Off-site Transportation Issues are also Present

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity to the Office of Enforcement and Investigation to issue clarifying guidance from time to...

  1. TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM

    SciTech Connect (OSTI)

    WYRWAS RB; PAGE JS; COOKE GS

    2012-04-19

    This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

  2. Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test

    SciTech Connect (OSTI)

    Wang, Jy-An John; Tan, Ting; Jiang, Hao; Zhang, Wei; Feng, Zhili

    2012-10-01

    The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

  3. Test procedures and protocols: Their relevance to the figure of merit for thermal distribution systems. Volume 1: Informal report

    SciTech Connect (OSTI)

    Andrews, J.W.

    1993-09-01

    A conceptual framework is developed that categorizes measurement protocols for forced-air thermal distribution systems in small buildings. This framework is based on the distinction between two generic approaches. The {open_quote}system-comparison{close_quote} approach seeks to determine, via a pair of whole-house energy-use measurements, the difference in energy use between the house with the as-found duct system and the same house with no energy losses attributable to the thermal distribution system. The {open_quote}component loss-factor{close_quote} approach identifies and measures the individual causes of duct losses, and then builds up a value for the net overall duct efficiency, usually with the help of computer simulation. Examples of each approach are analyzed and related to a proposed Figure of Merit for thermal distribution systems. This Figure of Merit would serve as the basis for a Standard Method of Test analogous to those already in place for furnaces, boilers, air conditioners, and heat pumps.

  4. Microwave power coupler for a superconducting multiple-cell cavity for accelerator application and its testing procedures

    SciTech Connect (OSTI)

    Li, Jianjian

    2008-12-01

    Superconducting cavity resonators offer the advantage of high field intensity for a given input power, making them an attractive contender for particle accelerator applications. Power coupling into a superconducting cavity employed in a particle accelerator requires unique provisions to maintain high vacuum and cryogenic temperature on the cavity side, while operating with ambient conditions on the source side. Components introduced to fulfill mechanical requirements must show negligible obstruction of the propagation of the microwave with absence of critical locations that may give rise to electron multipaction, leading to a multiple section design, instead of an aperture, a probe, or a loop structure as found in conventional cavities. A coaxial power coupler for a superconducting multiple-cell cavity at 3.9 GHz has been developed. The cavity is intended to be employed as an accelerator to provide enhanced electron beam quality in a free-electron laser in Hamburg (FLASH) user facility. The design of the coupler called for two windows to sustain high vacuum in the cavity and two bellows to accommodate mechanical dimensional changes resulting from cryogenics. Suppression of multipacting was accomplished by the choice of conductor dimensions and materials with low second yield coefficients. Prior to integration with the cavity, the coupler was tested for intrinsic properties in a back-to-back configuration and conditioned for high-power operation with increasing power input. Maximum incident power was measured to be 61 kW. When integrated with the superconducting cavity, a loaded quality factor of 9 x 10 5 was measured by transient method. Coupler return loss and insertion loss were estimated to be around -21 dB and -0.2 dB, respectively.

  5. POLICY GUIDANCE MEMORANDUM #01 Documenting Hires Funded by ARRA (Expired)

    Broader source: Energy.gov [DOE]

    THIS GUIDANCE HAS EXPIRED Guidance on Documenting Hires funded by American Recovery and Reinvestment Act of 2009

  6. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs

    SciTech Connect (OSTI)

    Fridley, David; Zheng, Nina; Zhou, Nan

    2010-06-01

    Since the late 1970s, energy labeling programs and mandatory energy performance standards have been used in many different countries to improve the efficiency levels of major residential and commercial equipment. As more countries and regions launch programs covering a greater range of products that are traded worldwide, greater attention has been given to harmonizing the specific efficiency criteria in these programs and the test methods for measurements. For example, an international compact fluorescent light (CFL) harmonization initiative was launched in 2006 to focus on collaboration between Australia, China, Europe and North America. Given the long history of standards and labeling programs, most major energy-consuming residential appliances and commercial equipment are already covered under minimum energy performance standards (MEPS) and/or energy labels. For these products, such as clothes washers and CFLs, harmonization may still be possible when national MEPS or labeling thresholds are revised. Greater opportunity for harmonization exists in newer energy-consuming products that are not commonly regulated but are under consideration for new standards and labeling programs. This may include commercial products such as water dispensers and vending machines, which are only covered by MEPS or energy labels in a few countries or regions. As China continues to expand its appliance standards and labeling programs and revise existing standards and labels, it is important to learn from recent international experiences with efficiency criteria and test procedures for the same products. Specifically, various types of standards and labeling programs already exist in North America, Europe and throughout Asia for products in China's 2010 standards and labeling programs, namely clothes washers, water dispensers, vending machines and CFLs. This report thus examines similarities and critical differences in energy efficiency values, test procedure specifications and other

  7. DOE Indian Energy Purchase Preference Policy Guidance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Indian Energy Purchase Preference Policy Guidance DOE Indian Energy Purchase Preference Policy Guidance PDF_FINAL DOE Indian Energy purchase preference policy guidance.pdf (266.84 KB) More Documents & Publications State Energy Program Notice 14-2, Implementation Model Guidance FY 2014-2024 Ten Year Site Plan Preparation Guidance Revised Guidance for Recruitment, Retention and Relocation Incentives

  8. ISSUANCE 2016-03-10: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Broader source: Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  9. ISSUANCE 2016-04-14: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  10. Guidance for Radiation Accident Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure Demonstration Introduction Radioactive materials are among the many kinds of hazardous substances emergency responders might have to deal with in an accident. It is ...

  11. Idaho - Access Management: Standards and Procedures for Highway...

    Open Energy Info (EERE)

    Access Management: Standards and Procedures for Highway Right-of-Way Encroachments Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance...

  12. Nevada Procedures for Filing Application for a Water Right |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Procedures for Filing Application for a Water RightPermittingRegulatory...

  13. Emergency Procedures

    Broader source: Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  14. Product consistency test and toxicity characteristic leaching procedure results of the ceramic waste form from the electrometallurgical treatment process for spent fuel

    SciTech Connect (OSTI)

    Johnson, S. G.; Adamic, M. L.: DiSanto, T.; Warren, A. R.; Cummings, D. G.; Foulkrod, L.; Goff, K. M.

    1999-11-11

    The ceramic waste form produced from the electrometallurgical treatment of sodium bonded spent fuel from the Experimental Breeder Reactor-II was tested using two immersion tests with separate and distinct purposes. The product consistency test is used to assess the consistency of the waste forms produced and thus is an indicator of a well-controlled process. The toxicity characteristic leaching procedure is used to determine whether a substance is to be considered hazardous by the Environmental Protection Agency. The proposed high level waste repository will not be licensed to receive hazardous waste, thus any waste forms destined to be placed there cannot be of a hazardous nature as defined by the Resource Conservation and Recovery Act. Results are presented from the first four fully radioactive ceramic waste forms produced and from seven ceramic waste forms produced from cold surrogate materials. The fully radioactive waste forms are approximately 2 kg in weight and were produced wit h salt used to treat 100 driver subassemblies of spent fuel.

  15. Commercial Grade Dedication Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance Commercial Grade Dedication Guidance This Guide provides an acceptable process (Commercial Grade Dedication [CGD]) for EM facilities and projects to dedicate an item or service that performs a nuclear safety function that was not manufactured, developed, or performed under a qualified American Society of Mechanical Engineers (ASME) NQA-1 Quality Assurance program. This Guide also provides guidance for the development of the associated documentation supporting the dedication activity.

  16. Energy Sector Cybersecurity Framework Implementation Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Cybersecurity Framework Implementation Guidance Energy Sector Cybersecurity Framework Implementation Guidance On January 8, 2015, the Energy Department released guidance to help the energy sector establish or align existing cybersecurity risk management programs to meet the objectives of the Cybersecurity Framework released by the National Institutes of Standards and Technology (NIST) in February 2014. The voluntary Cybersecurity Framework consists of standards, guidelines, and

  17. Adverse Diversity Analysis Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adverse Diversity Analysis Guidance Adverse Diversity Analysis Guidance Attachment 8 - Adverse Diversity Analysis Guidance (124.04 KB) Attachment 8(a) - WFR disparate impact chart example completed (96.18 KB) Attachment 8(b) - WFR disparate impact chart clean (88.56 KB) More Documents & Publications Fact #922: April 25, 2016 Share of Older Population Holding Driver's Licenses is Up and Share of Younger Population Holding Driver's Licenses is Down - Dataset FAIR Act Inventory - FY13 Fayette

  18. CAP Program Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CAP Program Guidance CAP Program Guidance In 2002, the Department of Energy signed an interagency agreement with the Department of Defense's Computer/Electronic Accommodations Program (CAP) program to provide assistive/adaptive technology free of charge to DOE employees with disabilities. The following information regarding CAP is being provided to assist federal employees, managers and on- site disability coordinators with the CAP application process. CAP Program Guidance (40.26 KB) Responsible

  19. Multiyear Program Plan Template - Phase II Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Program Plan Guidance and Template Page For questions or help, contact the PM Help Desk at PMHelpDesk @ee.doe.gov EERE Multi- Year Program Plan Guidance and Template July 2016 Prepared by the Project Management Coordination Office (PMCO) EERE Multi-Year Program Plan Guidance and Template Page i For questions or help, contact the PM Help Desk at PMHelpDesk @ee.doe.gov Table of Contents Part I - Multi-Year Program Plan (MYPP)

  20. Policy, Guidance & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reports Policy, Guidance & Reports The Department of Energy's (DOE) Office of Environment, Health, Safety and Security (EHSS) administers DOE-wide health, safety, security and environmental policy, programs and guidance, and related federal requirements that support DOE's mission accomplishment in a safe, secure and environmentally responsible manner. Guidance documents are developed to support effective implementation of directives and standards and provide technical positions on

  1. Commissioning Guidance for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. Download the Commissioning Guidance. (316.39 KB) More Documents & Publications FEMP Comprehensive ESPC Workshop Presentations Investment-Grade Audit Kickoff Meeting Sample

  2. Transmission line environmental assessment guidance document

    SciTech Connect (OSTI)

    Jackson, J.; Pentecost, E.; Muzzarelli, J.

    1994-01-01

    Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

  3. Guidance manual for conducting technology demonstration activities

    SciTech Connect (OSTI)

    Jolley, Robert L.; Morris, Michael I.; Singh, Suman P.N.

    1991-12-01

    This demonstration guidance manual has been prepared to assist Martin Marietta Energy Systems, Inc. (Energy Systems), staff in conducting demonstrations. It is prepared in checklist style to facilitate its use and assumes that Energy Systems personnel have project management responsibility. In addition to a detailed step-by-step listing of procedural considerations, a general checklist, logic flow diagram, and several examples of necessary plans are included to assist the user in developing an understanding of the many complex activities required to manage technology demonstrations. Demonstrations are pilot-scale applications of often innovative technologies to determine the commercial viability of the technologies to perform their designed function. Demonstrations are generally conducted on well-defined problems for which existing technologies or processes are less than satisfactory in terms of effectiveness, cost, and/or regulatory compliance. Critically important issues in demonstration management include, but are not limited to, such factors as communications with line and matrix management and with the US Department of Energy (DOE) and Energy Systems staff responsible for management oversight, budgetary and schedule requirements, regulatory compliance, and safety.

  4. Enforcement Guidance Supplements | Department of Energy

    Office of Environmental Management (EM)

    To better support and describe implementation of the Department of Energy's nuclear safety enforcement program, over the years the Office of Enforcement has developed guidance (in ...

  5. NEPA Contracting Reform Guidance (December 1996)

    Broader source: Energy.gov [DOE]

    This guidance provides: model statements of work, information on contract types and incentives, direction on effective NEPA contract management by the NEPA Document Manager, a system for measuring...

  6. Standardized Permit Guidance | Open Energy Information

    Open Energy Info (EERE)

    current through August 7, 2014. Published NA Year Signed or Took Effect 2006 Legal Citation Standardized Permit Guidance (2006) DOI Not Provided Check for DOI availability:...

  7. Council on Environmental Quality - Guidance for Environmental...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Memorandum: Council on Environmental Quality - Guidance for Environmental Assessments of Forest Health...

  8. Guidance Regarding Refinancing, Restructuring, or Modifying Loan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract Guidance Regarding...

  9. Participatory Carbon Monitoring: Operational Guidance for National...

    Open Energy Info (EERE)

    Participatory Carbon Monitoring: Operational Guidance for National REDD+ Carbon Accounting Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Participatory Carbon...

  10. EERE 810 - Peer Review Guidance - June 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE 810 Peer Review Guidance June 2016 Template Version: 6/24/2016 June 2016 Table of Contents What Has Changed?................................................................................................................................................ 3 Executive Summary................................................................................................................................................. 3 1 Introduction

  11. GC GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS

    Energy Savers [EERE]

    GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS We have been asked about how the Department implements what is known as the "minor construction threshold," which limits the amount of ...

  12. All NEPA Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Final Guidance for Consideration of Environmental Justice in Clean Air Act 309 Reviews (1999) Pollution Prevention & Environmental Impact Reduction Checklists for NEPA309 ...

  13. NEPA Contracting Reform Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance also provides: model statements of work, direction on NEPA contract management by NEPA Document Manager; a system for measuring NEPA costs and for evaluating contractor ...

  14. Energy Sector Cybersecurity Framework Implementation Guidance

    Broader source: Energy.gov (indexed) [DOE]

    JANUARY 2015 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Energy Sector ...

  15. Guidance on Inherently Governmental Functions | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Federal law prohibits contractors from performing "inherently governmental functions." This guidance is designed to provide the basic rules applicable to the Department....

  16. New Guidance Helps LM Manage Institutional Controls

    Broader source: Energy.gov [DOE]

    The official Guidance for Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites, was issued in January as a supplemental...

  17. Energy Sector Cybersecurity Framework Implementation Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    Department released guidance to help the energy sector establish or align existing cybersecurity risk management programs to meet the objectives of the Cybersecurity Framework...

  18. Draft Energy Sector Cybersecurity Framework Implementation Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    in the Federal Register, inviting the public to comment on DOE's Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October...

  19. Energy Sector Cybersecurity Framework Implementation Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    invites public comment on a draft of the Energy Sector Cybersecurity Framework Implementation Guidance. Comments must be received on or before October 14, 2014. The draft document...

  20. Health and Safety Procedures Manual for hazardous waste sites

    SciTech Connect (OSTI)

    Thate, J.E.

    1992-09-01

    The Oak Ridge National Laboratory Chemical Assessments Team (ORNL/CAT) has developed this Health and Safety Procedures Manual for the guidance, instruction, and protection of ORNL/CAT personnel expected to be involved in hazardous waste site assessments and remedial actions. This manual addresses general and site-specific concerns for protecting personnel, the general public, and the environment from any possible hazardous exposures. The components of this manual include: medical surveillance, guidance for determination and monitoring of hazards, personnel and training requirements, protective clothing and equipment requirements, procedures for controlling work functions, procedures for handling emergency response situations, decontamination procedures for personnel and equipment, associated legal requirements, and safe drilling practices.

  1. State Energy Program 2015 Formula Grant Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Formula Grant Guidance State Energy Program 2015 Formula Grant Guidance The document below is effective February 27, 2015 and offers State Energy Program Formula Grant Guidance for Program Year 2015. SEP 2015 Formula Grant Guidance (1.48 MB) More Documents & Publications State Energy Program 2016 Formula Grant Guidance State Energy Program 2014 Formula Grant Guidance Program Year 2013 State Energy Program Formula Grant Guidance

  2. State Energy Program 2016 Formula Grant Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Formula Grant Guidance State Energy Program 2016 Formula Grant Guidance The document below is effective Feb. 26, 2016, and offers State Energy Program Formula Grant Guidance for Program Year 2016. SEP 2016 Formula Grant Guidance (6.45 MB) More Documents & Publications State Energy Program 2015 Formula Grant Guidance State Energy Program 2014 Formula Grant Guidance Program Year 2013 State Energy Program Formula Grant Guidance

  3. Laboratory Analytical Procedures | Bioenergy | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Analytical Procedures NREL develops laboratory analytical procedures (LAPs) to provide validated methods for biofuels and pyrolysis bio-oils research. Biomass Compositional Analysis These lab procedures provide tested and accepted methods for performing analyses commonly used in biofuels research. Bio-Oil Analysis These lab procedures allow for the analysis of raw and upgraded pyrolysis bio-oils. Microalgae Compositional Analysis These lab procedures help scientists and researchers

  4. Resource Conservation and Recovery Act (RCRA) facility assessment guidance

    SciTech Connect (OSTI)

    Rastatter, C.; Fagan, D.; Foss, D.

    1986-10-01

    Facilities that manage hazardous wastes are required to obtain permits under the Resource Conservation and Recovery Act (RCRA) of 1976. This guidance document informs RCRA permit writers and enforcement officials of procedures to be used in conducting RCRA Facility Assessments. The RCRA corrective-action program was established to investigate and require clean up of releases of hazardous wastes or constituents to the environment at facilities subject to RCRA permits. Releases to ground water, surface water, air, soil, and subsurface strata may be addressed.

  5. Energy Sector Cybersecurity Framework Implementation Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    JANUARY 2015 ENERGY SECTOR CYBERSECURITY FRAMEWORK IMPLEMENTATION GUIDANCE U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Energy Sector Cybersecurity Framework Implementation Guidance │ Table of Contents TABLE OF CONTENTS 1. Introduction .............................................................................................................................................. 1 2. Preparing for Framework Implementation

  6. Guidance for Procurement Officials | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Procurement Officials Guidance for Procurement Officials Acquisition Regulations Federal Acquisition Regulation (FAR) Department of Energy Acquisition Regulation (DEAR) Acquisition Policy Acquisition Letters Acquisition Guidance Acquisition Guide Contracting for Support Services Department of Energy Acquisition System - A Guide for Executives Ethics in Procurement Lobbying Brochure Procurement Integrity Brochure Unsolicited Proposals Balanced scorecard Balanced Scorecard performance

  7. Guidance for performing preliminary assessments under CERCLA

    SciTech Connect (OSTI)

    1991-09-01

    EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

  8. Information and Records Management Transition Guidance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004) Information and Records Management Transition Guidance (869.4 KB) More Documents & Publications LM Records and Information Management Transition Guidance (May 2016) ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS

  9. Requirements, guidance and logic in planning environmental investigations: Approval versus implementation

    SciTech Connect (OSTI)

    Brice, D.A. [3D/Environmental Services, Inc., Cincinnati, OH (United States); Meredith, D.V.; Harris, M.Q. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project

    1993-09-09

    In today`s litigious society, it is important for both private parties and government to plan and conduct environmental investigations in a scientifically sound manner, documenting the purpose, methods, and results in a consistent fashion throughout the exercise. Planning documents are prepared during the initial phases of environmental investigations. Project objectives, including data quality requirements, specific work to be conducted to fulfill data needs, and operating procedures are specified. Regulatory agency approval of these documents is often required prior to plan implementation. These approvals are necessary and appropriate to fulfilling the agency`s mandated role. Many guidance documents prepared by regulatory agencies suggest the content and format of various scoping documents. These guidances help standardize thought processes and considerations in planning, and provide a template to ensure that both the plan and the proposed work will fulfill regulatory requirements. This work describes the preparation and use of guidance documents for planning environmental studies. The goals and some of the pitfalls of such documents are discussed. Guidance should include the following elements: the purpose of the guidance and a description of where it applies; the type of items to be addressed in planning; identification of requirements are applicable to all projects for which the guidance is intended; identification of requirements only applicable in certain situations; a description of items to facilitate planning; a suggested format for fulfilling requirements; example applications of the guidance. Disagreements arise between planners and reviewers/approvers when elements of guidance are used as leverage to require work not directly related to project objectives. Guidance may be inappropriately used as a milestone by which site-specific plans are judged. Regulatory agency review and approval may be regarded as a primary objective of the plan.

  10. CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ASSISTANCE PROGRAM | Department of Energy CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM CLOSEOUT PROCEDURES FOR RECOVERY ACT GRANTS UNDER THE WEATHERIZATION ASSISTANCE PROGRAM This document contains information on closeout procedures for Recovery Act Grants under the Weatherization Assistance Program (WAP). wap_closeout_guidance.pdf (82.87 KB) More Documents & Publications WPN 12-3: Closeout Procedures for Recovery Act Grants Under the

  11. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  12. Mini-Guidance Articles from Lessons Learned Quarterly Reports, Dec. 1994 to Sept. 2005

    Broader source: Energy.gov [DOE]

    The articles in this collection, organized by topic, contain procedural interpretations and recommendations developed by the DOE Office of NEPA Policy and Compliance in consultation with the Office of General Counsel, the DOE NEPA Community, and others. The mini-guidance articles were developed to address problems identified in the course of preparing, reviewing, and issuing NEPA documents.

  13. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman; Katya Le Blanc

    2011-09-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  14. Enforcement Guidance Supplement 99-02, DOE Enforcement Activities of Internal Dosimetry Program Requirements

    Office of Environmental Management (EM)

    EGS 99-02 Appendix E - Operational Procedures for Enforcement Department of Energy Washington, DC 20585 July 16, 1999 MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS FROM: R. KEITH CHRISTOPHER DIRECTOR OFFICE OF ENFORCEMENT AND INVESTIGATION SUBJECT: Enforcement Guidance Supplement 99-02: DOE Enforcement Activities of Internal Dosimetry Program Requirements Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson

  15. Long-Term Stewardship Baseline Report and Transition Guidance

    SciTech Connect (OSTI)

    Kristofferson, Keith

    2001-11-01

    Long-term stewardship consists of those actions necessary to maintain and demonstrate continued protection of human health and the environment after facility cleanup is complete. As the Department of Energys (DOE) lead laboratory for environmental management programs, the Idaho National Engineering and Environmental Laboratory (INEEL) administers DOEs long-term stewardship science and technology efforts. The INEEL provides DOE with technical, and scientific expertise needed to oversee its long-term environmental management obligations complexwide. Long-term stewardship is administered and overseen by the Environmental Management Office of Science and Technology. The INEEL Long-Term Stewardship Program is currently developing the management structures and plans to complete INEEL-specific, long-term stewardship obligations. This guidance document (1) assists in ensuring that the program leads transition planning for the INEEL with respect to facility and site areas and (2) describes the classes and types of criteria and data required to initiate transition for areas and sites where the facility mission has ended and cleanup is complete. Additionally, this document summarizes current information on INEEL facilities, structures, and release sites likely to enter long-term stewardship at the completion of DOEs cleanup mission. This document is not intended to function as a discrete checklist or local procedure to determine readiness to transition. It is an overarching document meant as guidance in implementing specific transition procedures. Several documents formed the foundation upon which this guidance was developed. Principal among these documents was the Long-Term Stewardship Draft Technical Baseline; A Report to Congress on Long-Term Stewardship, Volumes I and II; Infrastructure Long-Range Plan; Comprehensive Facility Land Use Plan; INEEL End-State Plan; and INEEL Institutional Plan.

  16. Preparation of waste analysis plans under the Resource Conservation and Recovery Act (Interim guidance)

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This document is organized to coincide with the suggested structure of the actual Waste Analysis Plans (WAP) discussed in the previous section. The contents of the remaining eleven chapters and appendices that comprise this document are described below: Chapter 2 addresses waste streams, test parameters, and rationale for sampling and analytical method selection; test methods for analyzing parameters; proceduresfor collecting representative samples; and frequency of sample collection and analyses. These are the core WAP requirements. Chapter 3 addresses analysis requirements for waste received from off site. Chapter 4addresses additional requirements for ignitable, reactive, or incompatible wastes. Chapter 5 addresses unit-specific requirements. Chapter 6 addresses special procedures for radioactive mixed waste. Chapter 7 addresses wastes subject to the land disposal restrictions. Chapter 8 addresses QA/QC procedures. Chapter 9 compares the waste analysis requirements of an interim status facility with those of a permitted facility. Chapter 10 describes the petition process required for sampling and analytical procedures to deviate from accepted methods, such as those identified in promulgated regulations. Chapter 11 reviews the process for modification of WAPs as waste type or handling practices change at a RCRA permitted TSDF. Chapter 12 is the list of references that were used in the preparation of this guidance. Appendix A is a sample WAP addressing physical/chemical treatment and container storage. Appendix B is a sample WAP addressing an incinerator and tank systems. Appendix C discusses the relationship of the WAP to other permitting requirements and includes specific examples of how waste analysis is used to comply with certain parts of a RCRA permit. Appendix D contains the exact wording for the notification/certification requirements under theland disposal restrictions.

  17. Guidance on the Consideration of Past Actions in Cumulative Effects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information, Final Rule DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions CEQ Guidance on the Application of NEPA to ...

  18. Guidance for Requesting Emergency Oil from the SPR | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services Petroleum Reserves Strategic Petroleum Reserve Guidance for Requesting Emergency Oil from the SPR Guidance for Requesting Emergency Oil from the SPR If hurricanes ...

  19. Technical Standards, ALOHA-Code Guidance- June 22, 2004

    Broader source: Energy.gov [DOE]

    DOE-EH-4.2.1.4-ALOHA-Code Guidance, ALOHA Computer Code Application Guidance for Documented Safety Analysis

  20. Guidance for Fiscal Year 2015 Facilities Information Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations PDF...

  1. Guidance for Energy Efficiency and Conservation Block Grant Recipients...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recipients on Program Evaluation Guidelines Guidance for Energy Efficiency and Conservation Block Grant Recipients on Program Evaluation Guidelines Guidance for Energy Efficiency ...

  2. SEP Program Notice 10-008E, Financing Programs Guidance

    Broader source: Energy.gov [DOE]

    This guidance provides information to State Energy Program grantees on financing programs. This guidance supersedes SEP Program notice 10-008D, which was issued Oct. 26, 2012.

  3. EECBG Appliance Rebate Guidance (Program Notice 10-015) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EECBG Appliance Rebate Guidance (Program Notice 10-015) Guidance for Efficiency and Conservation Block Grant Program grantees on consumer rebate programs for Energy Star and other ...

  4. Building America Technology Solutions Case Study: Design Guidance...

    Energy Savers [EERE]

    Design Guidance for Passive Vents in New Construction, Multifamily Buildings Building America Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction...

  5. Office of Personnel Management (OPM) Guidance on Diversity and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Personnel Management (OPM) Guidance on Diversity and Inclusion Office of Personnel Management (OPM) Guidance on Diversity and Inclusion The following documents are from ...

  6. OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf OfficeGovernmentEthicsGuidanceEthicsandProcurementIntegrity.pdf (2.33 MB) More Documents & Publications POLICY FLASH ...

  7. Guidance for FY2014 Facilities Information Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY2014 Facilities Information Management System Data Validations Guidance for FY2014 Facilities Information Management System Data Validations FY 2014 FIMS Data Validation Guidance ...

  8. DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process DOE Issues Enforcement Guidance on Large-Capacity Clothes Washer Waivers and the Waiver Process...

  9. Guidance on Ex Parte Communications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ex Parte Communications Guidance on Ex Parte Communications The Department of Energy sets forth guidance on ex parte communications during informal rulemaking proceedings. The ...

  10. Energy Department Issues Tribal Renewable Energy Purchase Guidance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project...

  11. Energy Department Issues Tribal Renewable Energy Purchase Guidance...

    Energy Savers [EERE]

    Renewable Energy Purchase Guidance and Project Development Resources Energy Department Issues Tribal Renewable Energy Purchase Guidance and Project Development Resources December ...

  12. Memorandum Guidance for the Preparation of Department of Energy...

    Energy Savers [EERE]

    Guidance for the Preparation of Department of Energy (DOE) Annual Site Environmental reports (ASERs) for Calendar Year 2014 Memorandum Guidance for the Preparation of Department of ...

  13. Guidance for Preparation of the 2014 Department of Energy Annual...

    Office of Environmental Management (EM)

    Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental Reports Guidance for Preparation of the 2014 Department of Energy Annual Site Environmental ...

  14. Utah Air Guidance Documents Webpage | Open Energy Information

    Open Energy Info (EERE)

    link for Utah Air Guidance Documents Webpage Citation Utah Department of Environmental Quality. Utah Air Guidance Documents Webpage Internet. State of Utah. cited 201411...

  15. DRAFT NEPA Guidance on Consideration of the Effects of Climate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and ...

  16. Application Submittal Guidance for Stormwater Permits andPost...

    Open Energy Info (EERE)

    Post-Authorization Stormwater Permit CorrespondencePermittingRegulatory GuidanceGuideHandbook Abstract Application Submittal Guidance for Stormwater Permits and...

  17. Renewable Energy Requirement Guidance for EPAct 2005 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Guidance originally specified conditions for agencies to meet the renewable energy ... and is still applicable. Download the Renewable Energy Requirement Guidance for EPAct ...

  18. Transmittal Letter for Final Federal Renewable Energy Guidance...

    Office of Environmental Management (EM)

    Transmittal Letter for Final Federal Renewable Energy Guidance Transmittal Letter for Final Federal Renewable Energy Guidance Letter to federal energy officials summarizing the new ...

  19. 2015 Federal Real Property Council Reporting Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Federal Real Property Council Reporting Guidance 2015 Federal Real Property Council Reporting Guidance Real Property Reporting: EO 13327 requires agencies to report annually ...

  20. Army Corps of Engineers - Regulatory Guidance Letters | Open...

    Open Energy Info (EERE)

    Guidance Letters Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Army Corps of Engineers - Regulatory Guidance Letters Abstract This webpage...