Powered by Deep Web Technologies
Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Offsite environmental monitoring report. Radiation monitoring around United States nuclear test areas, calendar year 1982  

Science Conference Proceedings (OSTI)

A principal activity of the Offsite Radiological Safety Program is routine environmental monitoring for radioactive materials in various media and for radiation in areas which may be affected by nuclear tests. It is conducted to document compliance with standards, to identify trends, and to provide information to the public. This report summarizes these activities for CY 1982.

Black, S. C.; Grossman, R. F.; Mullen, A. A.; Potter, G. D.; Smith, D. D. [comps.

1983-07-01T23:59:59.000Z

2

Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1991  

Science Conference Proceedings (OSTI)

This report describes the Offsite Radiation Safety Program conducted during 1991 by the Environmental Protection Agency`s (EPA`s) Environmental Monitoring Systems Laboratory-Las Vegas. This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ion chambers (PICs); and by biological monitoring of animals, food crops, and humans. Personnel with mobile monitoring equipment are placed in areas downwind from the test site prior to each nuclear weapons test to implement protective actions, provide immediate radiation monitoring, and obtain environmental samples rapidly after any occurrence of radioactivity release. Comparison of the measurements and sample analysis results with background levels and with appropriate standards and regulations indicated that there was no radioactivity detected offsite by the various EPA monitoring networks and no exposure above natural background to the population living in the vicinity of the NTS that could be attributed to current NTS activities. Annual and long-term trends were evaluated in the Noble Gas, Tritium, Milk Surveillance, Biomonitoring, TLD, PIC networks, and the Long-Term Hydrological Monitoring Program.

Chaloud, D.J.; Dicey, B.B.; Mullen, A.A.; Neale, A.C.; Sparks, A.R.; Fontana, C.A.; Carroll, L.D.; Phillips, W.G.; Smith, D.D.; Thome, D.J.

1992-01-01T23:59:59.000Z

3

Offsite environmental monitoring report: Radiation monitoring around United States nuclear test areas, calendar year 1993  

Science Conference Proceedings (OSTI)

This report describes the Offsite Radiation Safety Program conducted during 1993 by the Environmental Protection Agency`s (EPA`s) Environmental Monitoring Systems Laboratory - Las Vegas (EMSL-LV). This laboratory operates an environmental radiation monitoring program in the region surrounding the Nevada Test Site (NTS) and at former test sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The surveillance program is designed to measure levels and trends of radioactivity, if present, in the environment surrounding testing areas to ascertain whether current radiation levels and associated doses to the general public are in compliance with existing radiation protection standards. The surveillance program additionally has the responsibility to take action to protect the health and well being of the public in the event of any accidental release of radioactive contaminants. Offsite levels of radiation and radioactivity are assessed by sampling milk, water, and air; by deploying thermoluminescent dosimeters (TLDs) and using pressurized ionization chambers (PICs); by biological monitoring of foodstuffs including animal tissues and food crops; and by measurement of radioactive material deposited in humans.

Chaloud, D.J; Daigler, D.M.; Davis, M.G. [and others

1996-06-01T23:59:59.000Z

4

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA, FOR CALENDAR YEAR 2004  

Science Conference Proceedings (OSTI)

This post-closure inspection and monitoring report has been prepared according to the stipulations laid out in the Closure Report (CR) for Corrective Action Unit (CAU) 417, Central Nevada Test Area (CNTA)--Surface (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office [NNSA/NV], 2001), and the Federal Facility Agreement and Consent Order (FFACO, 1996). This report provides an analysis and summary of site inspections, subsidence surveys, meteorological information, and soil moisture monitoring data for CAU 417, which is located in Hot Creek Valley, Nye County, Nevada. This report covers Calendar Year 2004. Inspections at CAU 417 are conducted quarterly to document the physical condition of the UC-1, UC-3, and UC-4 soil covers, monuments, signs, fencing, and use restricted areas. The physical condition of fencing, monuments, and signs is noted, and any unusual conditions that could impact the integrity of the covers are reported. The objective of the soil moisture monitoring program is to monitor the stability of soil moisture conditions within the upper 1.2 meters (m) (4 feet [ft]) of the UC-1 Central Mud Pit (CMP) cover and detect changes that may be indicative of moisture movement exceeding the cover design performance expectations.

BECHTEL NEVADA; NNSA NEVADA SITE OFFICE

2005-04-01T23:59:59.000Z

5

POST CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON POND FACILITY, NEVADA TEST SITE, NEVADA; FOR CALENDAR YEAR 2005  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection (NDEP), 1995) and the Federal Facility Agreement and Consent Order of 1996. Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by the NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period. This report covers calendar year 2005. Quarterly site inspections were performed in March, June, September, and December of 2005. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Five additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in) within a 24-hour period during 2005. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Precipitation records for 2005 are included in Appendix C.

NA

2006-03-01T23:59:59.000Z

6

Calendars  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendars Calendars Nature Bulletin No. 447-A March 4, 1972 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation CALENDARS This is a Leap Year with 366 days instead of the usual 365, and 29 days in February. Julius Caesar was responsible for that. The Roman calendar was patterned after those of the ancient Greeks and Egyptians which, in turn, had been modeled on that of the early Sumerians in Babylonia. The Sumerians had 12 lunar months in a year but every so often, to make up for the difference between that year and the year of the natural seasons, their astronomer-priests inserted an extra month. The Roman year was too short. It had had only 365 days for so many centuries that their calendar was badly out of step with the seasons and something had to be done about it. The summer months were coming in spring. Caesar's astronomers told him the reason: instead of being exactly 365 days long, a year was 365 and one-quarter days in length. Julius then solved the problem -- so he thought -- by establishing a leap year of 366 days every fourth year. He put the extra day in February because that was the last month on the old Roman calendar. Their new year started on the first day of March.

7

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA; FOR CALENDAR YEAR 2005  

SciTech Connect

Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U. S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites CAS 58-09-02, Mud Pit and 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits 9, an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action. Quarterly post-closure inspections are performed at the CASs that were closed in place at UC-I, UC-3, and UC-4. During calendar year 2005, site inspections were performed on March 15, June 16, September 22, and December 7. The inspections conducted at the UC-1 CMP documented that the site was in good condition and continued to show integrity of the cover unit. No new cracks or fractures were observed until the December inspection. A crack on the west portion of the cover showed evidence of lateral expansion; however, it is not at an actionable level. The crack will be sealed by filling with bentonite during the first quarter of 2006 and monitored during subsequent inspections. The cover vegetation was healthy and well established. No issues were identified with the CMP fence, gate, or subsidence monuments. No issues were identified with the warning signs and monuments at the other two UC-1 locations. The inspections at UC-3 indicated that the sites are in excellent condition. All monuments and signs showed no displacement, damage, or removal. A small erosion gully from spring rain runoff was observed during the June inspection, but it did not grow to an actionable level during 2005. No other issues or concerns were identified. Inspections performed at UC-4 Mud Pit C cover revealed that erosion rills were formed during March and September exposing the geosynthetic clay liner. Both erosion rills were repaired within 90 days of reporting. Sparse vegetation is present on the cover. The overall condition of the monuments, fence, and gate are in good condition. No issues were identified with the warning signs and monuments at the other four UC-4 locations. Subsidence surveys were conducted at UC-1 CMP and UC-4 Mud Pit C in March and September of 2005. The results of the subsidence surveys indicate that the covers are performing as expected, and no unusual subsidence was observed. The June vegetation survey of the UC-1 CMP cover and adjacent areas indicated that the revegetation has been very successful. The vegetation should continue to be monitored to document any changes in the plant community and identify conditions that could potentially require remedial action in order to maintain a viable vegetative cover on the site. Vegetation surveys should be conducted only as required. Precipitation during 2005 was above average, with an annual rainfall total of 21.79 centimeters (8.58 inches). Soil moisture content data show that the UC-1 CMP cover is performing as designed, with evapotranspiration effectively removing water from the cover. It is recommended to continue quarterly site inspections and the collection of soil moisture data for the UC-1 CMP cove

NONE

2006-04-01T23:59:59.000Z

8

Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada, for Calendar Year 2006  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the ''Resource Conservation and Recovery Act'' (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs), CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2006. Quarterly site inspections were performed in March, June, September, and December of 2006. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. One additional inspection was performed after a precipitation event that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2006. No significant changes in site conditions were noted during this inspection, and no corrective actions were necessary. A copy of the inspection checklist and field notes completed during this additional inspection is included in Appendix A of this report. Precipitation records for 2006 are included in Appendix C of this report.

NSTec Environmental Restoration

2007-03-01T23:59:59.000Z

9

ERRATA SHEET for Post-Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area Tonopah Test Range, Nevada, Calendar year 2001  

SciTech Connect

The fifth sentence of the first paragraph on Page 1 of the Post Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area, Tonopah Test Range, Nevada erroneously states that Revision 1 of the CR was issued in December of 2001 and was approved by NDEP on January 7, 2002. The sentence should state that Revision 1 of the CR was issued in December of 2001 and was approved by NDEP on February 22, 2002.

K. B. Campbell

2002-01-01T23:59:59.000Z

10

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada For Calendar Year 2006  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites, CAS 58-09-02, Mud Pit, and CAS 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill, and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits (5), an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action.

None

2007-06-01T23:59:59.000Z

11

Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada, Calendar Year 2000  

SciTech Connect

Corrective Action Unit (CAU) 424, the Area 3 Landfill Complex at Tonopah Test Range, consists of eight landfill sites, Corrective Action Sites (CASS), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the locations of the landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan contained, in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range. Nevada, report number DOE/NV--283. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. Post-closure monitoring consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000, and November 20, 2000. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist and photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2001-06-01T23:59:59.000Z

12

Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000  

SciTech Connect

Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

K. B. Campbell

2001-06-01T23:59:59.000Z

13

Post-Closure Inspection Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada, Calendar Year 2001  

Science Conference Proceedings (OSTI)

Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit [CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427, Area 3 Septic Waste Systems 2 and 6, Tonopah Test Range, Nevada, report number DOENV-56 1, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. As stated in Section 5.1 of the NDEP-approved CR, the annual Post-Closure inspection at CAU 427 consists of the following: (1) Verification of the presence of all leachfield and septic tank below-grade markers. (2) Verification that all warning signs are in-place, intact, and readable. (3) Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on May 16, 2001, and November 6, 2001. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C.

K. B. Campbell

2002-01-01T23:59:59.000Z

14

Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2001  

Science Conference Proceedings (OSTI)

Post-closure monitoring requirements for the Area 9 Unexploded Ordinance Landfill (Corrective Action Unit [CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV--284, August 1999. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5 , 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 453 consists of the following: (1) Visual site inspections are conducted twice a year to evaluate the condition of the cover. (2) Verification that the site is secure and the condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 15, 2001 and November 6, 2001. Both site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C.

K. B. Campbell

2002-01-01T23:59:59.000Z

15

Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complexes Tonopah Test Range, Nevada Calendar Year 2001  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of eight Corrective Action Sites (CASs), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the general location of the landfill cells. Figure 2 shows in more detail the location of the eight landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan, contained in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complexes, Tonopah Test Range, Nevada, report number DOE/NV--283, July 1999. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 424 consists of the following: (1) Site inspections conducted twice a year to evaluate the condition of the unit. (2) Verification that landfill markers and warning signs are in-place, intact, and readable. (3) Notice of any subsidence, erosion, unauthorized use, or deficiencies that may compromise the integrity of the landfill covers. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2002-02-01T23:59:59.000Z

16

Post-Closure Inspection Report for Corrective Action Unit 407: Roller Coaster RadSafe Area Tonopah Test Range, Nevada, Calendar Year 2001  

SciTech Connect

Post-closure monitoring requirements for the Roller Coaster RadSafe Area (Corrective Action Unit [CAU] 407) (Figure 1) are described in Closure Report for Corrective Action Unit 407, Roller Coaster RadSafe Area, Tonopah Test Range, Nevada, report number DOEN-694, October 2001. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on April 24,2001. No issues with the post-closure monitoring plan, Section 5 .O, were raised. However, other concerns raised by stakeholders required that the CR be revised. Revision 1 of CR was issued in December of 2001 and was approved by NDEP on January 7,2002. Section 5.2 of the NDEP-approved CR calls for site inspections to be conducted within the first six months following completion of cover construction. Following the first six months, site inspection are to be conducted twice yearly for the next two years. This report provides the results of the six month post-construction site inspection. As stated in Section 5.2 of the CR, Post-closure site inspections at CAU 407 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. To meet the fiscal year 2002 post-closure inspection schedule, the first post-closure site inspection was conducted on November 6,2001. The site inspection was conducted after completion of the revegetation activities (October 24,2000) and submittal of revision 0 of the CR (October 31,2001). All site inspections were conducted in accordance with the Post-Closure Inspection requirements stated in revision 0 of the CR. This report includes copies of inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklist is found in Attachment A, a copy of the field notes is found in Attachment By and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2002-01-01T23:59:59.000Z

17

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003  

Science Conference Proceedings (OSTI)

This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-04-01T23:59:59.000Z

18

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 426: Cactus Spring Waste Trenches (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2011-03-30T23:59:59.000Z

19

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008  

SciTech Connect

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: #2; CAU 400: Bomblet Pit and Five Points Landfill (TTR) #2; CAU 404: Roller Coaster Lagoons and Trench (TTR) #2; CAU 407: Roller Coaster RadSafe Area (TTR) #2; CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) #2; CAU 424: Area 3 Landfill Complexes (TTR) #2; CAU 426: Cactus Spring Waste Trenches (TTR) #2; CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) #2; CAU 453: Area 9 UXO Landfill (TTR) #2; CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) #2; CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2009-03-19T23:59:59.000Z

20

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA FOR CALENDAR YEAR 2005  

SciTech Connect

This post-closure inspection report includes the results of inspections, maintenance and repair activities, and conclusions and recommendations for Calendar Year 2005 for nine Corrective Action Units located on the Tonopah Test Range , Nevada.

NONE

2006-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Calendar -- Fernald Preserve Calendar  

Office of Legacy Management (LM)

> Visitors Center > Fernald Preserve > Visitors Center > Fernald Preserve Calendar Fernald Preserve Calendar The Fernald Preserve offers scheduled events and programs in addition to the trails and wildlife viewing areas that are open seven days a week from 7:00 a.m. to dusk. Special hikes are routinely held at the site, as well as educational programs and unique events such as stargazing. Unless otherwise noted on the calendar, all events begin and end at the Visitors Center and don't require any special equipment or knowledge. Please dress appropriately for the weather and activity. Programs are subject to change. Call (513) 648-6000 or e-mail us for additional information. Directions here. previous daynext daytodaySelect date >> S M T W T F S 1 2 3 4

22

Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2002  

Science Conference Proceedings (OSTI)

This Post-Closure Inspection Annual Report provides documentation of the semiannual inspections conducted at the following Corrective Action Units (CAU)s: CAU 400: Bomblet Pit and Five Points Landfill; CAU 404: Roller Coaster Lagoons and Trench; CAU 407: Roller Coaster RadSafe Area; CAU 424: Area 3 Landfill Complexes; CAU 426: Cactus Spring Waste Trenches; CAU 427: Septic Waste Systems 2, 6; and CAU 453: Area 9 UXO Landfill, all located at the Tonopah Test Range, Nevada. Post-closure inspections are not required at CAU 400 but are conducted to monitor vegetation and fencing at the site. Site inspections were conducted in May and November 2002. All site inspections were made after Nevada Division of Environmental Protection (NDEP) approval of the appropriate Closure Report (CR), excluding CAU 400 which did not require a CR, and were conducted in accordance with the Post-Closure Inspection Plans in the NDEP-approved CRs. Post-closure inspections conducted during 2002 identified several areas requiring maintenance/repairs. Maintenance work and proposed additional monitoring are included in the appropriate section for each CAU. This report includes copies of the Post-Closure Inspection Plans, Post-Closure Inspection Checklists, copies of the field notes, photographs, and the Post-Closure Vegetative Monitoring Report. The Post-Closure Inspection Plan for each CAU is located in Attachment A. Post-Closure Inspection Checklists are in Attachment B. Copies of the field notes from each inspection are included in Attachment C. Attachment D consists of the photographic logs and photographs of the sites. The post-closure vegetative monitoring report for calendar year 2002 is included in Attachment E.

R. B. Jackson

2003-08-01T23:59:59.000Z

23

Summary of radioactive solid waste received in the 200 areas during calendar year 1996  

Science Conference Proceedings (OSTI)

Rust Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1996. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document.

Hladek, K.L.

1997-05-21T23:59:59.000Z

24

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011  

SciTech Connect

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

NSTec Environmental Restoration

2012-02-21T23:59:59.000Z

25

Calendar Year 2004 annual site environmental report : Tonopah Test Range, Nevada & Kauai Test Facility, Hawaii.  

Science Conference Proceedings (OSTI)

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2004. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2005) and DOE Order 231.1A, Environment, Safety, and Health Reporting (DOE 2004b).

Montoya, Amber L.; Wagner, Katrina; Goering, Teresa Lynn; Koss, Susan I.; Salinas, Stephanie A.

2005-09-01T23:59:59.000Z

26

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007  

SciTech Connect

This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as scheduled. Any potential problem areas previously identified (e.g., areas of erosion, subsidence) should be monitored closely, and periodic vegetation surveys of the vegetated covers should continue.

NSTec Environmental Restoration

2008-06-01T23:59:59.000Z

27

Calendar Year 2001 Annual Site Environmental Report Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

Sandia Corporation (a subsidiary of Lockheed Martin Corporation through its contract with the U.S. Department of Energy [DOE]), National Nuclear Security Administration (NNSA) operates the Tonopah Test Range (TTR) in Nevada. Westinghouse Government Service, TTR's operations and maintenance contractor, performs most all environmental program functions. This Annual Site Environmental Report (ASER), which is published to inform the public about environmental conditions at TTR, describes environmental protection programs and summarizes the compliance status with major environmental laws and regulations during Calendar Year (CY) 2001.

VIGIL, FRANCINE S.

2002-09-01T23:59:59.000Z

28

POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004  

SciTech Connect

This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and anchoring straw bales in the wash to help control erosion at the Five Points Landfill. CAU 407 repairs included erosion repair, reseeding the cover, and replacement of one warning sign. CAU 424 repairs included filling topographically low areas to the surrounding grade. This was performed at Landfill Cell A3-1 (CAS 03-08-001-A301) and Landfill Cell A3-4 (CAS 03-08-002-A304). CAU 427 maintenance activities included placing additional red rocks over the subsurface site markers during the July inspection to assist in locating them for future inspections. CAU 487 repairs included installing eight above-grade monuments to mark the use restriction boundaries, installing use restriction warning signs, stamping coordinates on the brass survey markers, and subsidence repair at the A-8 anomaly. With the completion of these repairs and maintenance activities, all CAUs were in excellent condition at the end of 2004. The site inspections should continue as scheduled, and any potential problem areas, such as repaired areas of erosion or subsidence, should be monitored closely for further maintenance or repair needs.

BECHTEL NEVADA

2005-04-01T23:59:59.000Z

29

Event Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar Add EETD Calendar to Google Calendar Year Month Week Day Prev August 2013 Next Sunday Monday Tuesday Wednesday Thursday Friday Saturday 31 1 2 3 32 4 5 6 12:00pm -...

30

Lanl Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL Home Phonebook Calendar Video Events from one or more calendars could not be shown here because you do not have the permission to view them. Your browser does not appear to...

31

Representing and visualizing calendar expressions in texts  

Science Conference Proceedings (OSTI)

Temporal expressions that refer to a part of a calendar area in terms of common calendar divisions are studied. Our claim is that such a "calendar expression" (CE) can be described by a succession of operators operating on a calendar base (CB). These ...

Delphine Battistelli; Javier Couto; Jean-Luc Minel; Sylviane R. Schwer

2008-09-01T23:59:59.000Z

32

LANL Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar Calendar LANL Calendar LANL Public Events. . . Careers» Community» Environment» 70th Anniversary» C Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the HTML-only version of this page at: https://www.google.com/calendar/htmlembed?showTitle=0&showTabs=0&showCalendars=0&height=600&wkst=1&bgcolor=%23FFFFFF&src=19q3q9uc7hhi0n1g26a2lrjtbk@group.calendar.google.com&color=%23875509&src=fgk10mie1loqb2j74p1d31f1p0@group.calendar.google.com&color=%23853104&src=q1tai2uhgddrvti32ntk5c8s0o@group.calendar.google.com&color=%232F6309&src=lanleventscalendar@gmail.com&color=%232952A3&src=2irr2g4nfn589m88hatkpa4v8k@group.calendar.google.com&color=%23253b55&src=2irr2g4nfn589m88hatkpa4v8k@group.calendar.google.com&color=%23182C57&ctz=America%2FDenver

33

School Calendar  

Science Conference Proceedings (OSTI)

School Calendar. 2013. ... Mon, May 27, Memorial Day, Center closed. Thurs, June 13, Last Day of School for Kindergarten, Graduation at 11:00 AM. ...

2013-03-14T23:59:59.000Z

34

Calendar year 2002 annual site environmental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, oversees TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2002. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990) and DOE Order 231.1, Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2003-09-01T23:59:59.000Z

35

Calendar year 2003 : annual site enviromental report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii.  

SciTech Connect

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), through the Sandia Site Office (SSO), in Albuquerque, NM, manages TTR and KTF's operations. Sandia Corporation conducts operations at TTR in support of DOE/NNSA's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to Sandia Corporation in administering most of the environmental programs at TTR. Sandia Corporation operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2003. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia Corporation is responsible only for those environmental program activities related to its operations. The DOE/NNSA, Nevada Site Office (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2003) and DOE Order 231.1 Chg 2., Environment, Safety, and Health Reporting (DOE 1996).

Wagner, Katrina; Sanchez, Rebecca V.; Mayeux, Lucie; Koss, Susan I.; Salinas, Stephanie A.

2004-09-01T23:59:59.000Z

36

CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA  

NLE Websites -- All DOE Office Websites (Extended Search)

r r r r r t r r t r r r * r r r r r r CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA ,FACILITY RECORDS 1970 UNITED STATES ATOMIC ENERGY COMMlSSION NEVADA OPERATIONS OFFICE LAS VEGAS, NEVADA September 1970 Prepared By Holmes & Narver. Inc. On-Continent Test Division P.O. Box 14340 Las Vegas, Nevada 338592 ...._- _._--_ .. -- - - - - - - .. .. - .. - - .. - - - CENTRAL NEVPJJA SUPPLEMENTAL TEST AREA FACILITY RECORDS 1970 This page intentionally left blank - - .. - - - PURPOSE This facility study has been prepared in response to a request of the AEC/NVOO Property Management Division and confirmed by letter, W. D. Smith to L. E. Rickey, dated April 14, 1970, STS Program Administrative Matters. The purpose is to identify each facility, including a brief description, the acquisition cost either purchase and/or construction, and the AE costs if identi- fiable. A narrative review of the history of the subcontracts

37

NERSC Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

to display correctly. You can visit the HTML-only version of this page at: https:www.google.comcalendarhostedlbl.govhtmlembed?titleNERSC%20EVENTS&showTabs0&showCalendars0&...

38

Calendar Day  

U.S. Energy Information Administration (EIA) Indexed Site

CORPORATION / Refiner / Location CORPORATION / Refiner / Location Table 5. Refiners' Total Operable Atmospheric Crude Oil Distillation Capacity as of January 1, 2013 Calendar Day Barrels per CORPORATION / Refiner / Location Calendar Day Barrels per Companies with Capacity Over 100,000 bbl/cd .............................................................................................................................. VALERO ENERGY CORP 1,863,300 Valero Refining Co Texas LP .............................................................................................................................. Texas City, Texas 225,000 .............................................................................................................................. Corpus Christi, Texas 200,000 .............................................................................................................................. Houston, Texas

39

Nevada test site annual site environmental report for calendar year 1995  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1995 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

NONE

1996-09-01T23:59:59.000Z

40

Nevada Test Site annual site environmental report for calendar year 1996  

SciTech Connect

Monitoring and surveillance on and around the Nevada Test Site (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1996 indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA) Clean Air Package 1988 (CAP88)PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.11 mrem. This value is less than 2 percent of the federal dose limit prescribed for radionuclide air emissions. Any person receiving this dose would also have received 144 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act (NEPA) is being achieved and, where mandated, permits for air and water effluents and waste management have been obtained from the appropriate agencies. Cooperation with other agencies has resulted in seven different consent orders and agreements. Support facilities at off-NTS locations have complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits as mandated for each location.

Black, S.C.; Townsend, Y.E. [eds.

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Lithology and Stratigraphy of Holes Drilled in LANL-Use Areas of the Nevada Test Site  

SciTech Connect

Geologic data for ten holes drilled in areas used by Los Alamos National Laboratory at the Nevada Test Site are presented in this report. The holes include emplacement holes, instrumentation holes, and Underground Test Area wells drilled during calendar years 1991 through 1995. For each hole a stratigraphic log, a detailed lithologic log, and one or two geologic cross sections are presented, along with a supplemental data sheet containing information about the drilling operations, geology, or references. For three of the holes, graphic data summary sheets with geologic and geophysical data are provided as plates.

Lance B. Prothro; Sigmund L. Drellack, Jr.; Brian M. Allen

1999-07-01T23:59:59.000Z

42

Nevada Test Site annual site environmental report for calendar year 1997  

Science Conference Proceedings (OSTI)

Monitoring and surveillance, on and around the Nevada Test Site, (NTS) by US Department of Energy (DOE) contractors and NTS user organizations during 1997, indicated that operations on the NTS were conducted in compliance with applicable DOE, state, and federal regulations and guidelines. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of liquid effluents, or resuspension of soil was not detectable offsite, and exposure above existing background to members of the offsite population was not measured by the offsite monitoring program. Using the US Environmental Protection Agency`s (EPA`s) Clean Air Package 1988 (CAP88)-PC model and NTS radionuclide emissions and environmental monitoring data, the calculated effective dose equivalent (EDE) to the maximally exposed individual offsite would have been 0.089 mrem. Hazardous wastes were shipped offsite to approved disposal facilities.

Black, S.C.; Townsend, Y.E. [eds.

1998-10-01T23:59:59.000Z

43

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2007  

SciTech Connect

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was operated as the nation's site for nuclear weapons testing. The release of man-made radionuclides from the NTS as a result of testing activities has been monitored since the first decade of atmospheric testing. After 1962, when nuclear tests were conducted only underground, the radiation exposure to the public surrounding the NTS was greatly reduced. After the 1992 moratorium on nuclear testing, radiation monitoring on the NTS focused on detecting airborne radionuclides which come from historically contaminated soils resuspended into the air (e.g., by winds) and tritium-contaminated soil moisture emitted to the air from soils through evapotranspiration. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This is the dose limit established for someone living off of the NTS from radionuclides emitted to air from the NTS. This limit does not include the radiation doses that members of the public may receive through the intake of radioactive particles unrelated to NTS activities, such as those that come from naturally occurring elements in the environment (e.g., naturally occurring radionuclides in soil or radon gas from the earth or natural building materials), or from other man-made sources (e.g., medical treatments). The NTS demonstrates compliance using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. There are six critical receptor locations on the NTS that are actually pseudocritical receptor locations because they are hypothetical receptor locations; no person actually resides at these onsite locations. Annual average concentrations of detected radionuclides are compared with Concentration Levels (CL) for Environmental Compliance values listed in 40 CFR 61, Appendix E, Table 2. Compliance is demonstrated if the sum of fractions (CL/measured concentrations) of all detected radionuclides at each pseudo-critical receptor location is less than one. In 2007, as in all previous years for which this report has been produced, the NTS has demonstrated that the potential dose to the public from radiological emissions to air from current and past NTS activities is well below the 10 mrem/yr dose limit. Air sampling data collected onsite at each of the six pseudo-critical receptor stations on the NTS had average concentrations of nuclear test-related radioactivity that were a fraction of the limits listed in Table 2 in Appendix E of 40 CFR 61. They ranged from less than 1 percent to a maximum of 20 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS.

Robert Grossman; Ronald Warren

2008-06-01T23:59:59.000Z

44

Nevada Test Site annual site environmental report for calendar year 1998  

Science Conference Proceedings (OSTI)

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the US Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring Programs conducted by the US Environmental Protection Agency's (EPA) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this tenth combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Black, S.C.; Townsend, Y.E.

1999-10-01T23:59:59.000Z

45

Nevada Test Site Annual Site Environmental Report for Calendar Year - 1999  

SciTech Connect

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the U.S. Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring programs conducted by the U.S. Environmental Protection Agency's (EPA's) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this eleventh combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Townsend, Y.E.; Grossman, R.F.

2000-10-01T23:59:59.000Z

46

Nevada Test Site Annual Site Environmental Report for Calendar Year - 1999  

SciTech Connect

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the U.S. Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring programs conducted by the U.S. Environmental Protection Agency's (EPA's) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this eleventh combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Townsend, Y.E.; Grossman, R.F.

2000-10-01T23:59:59.000Z

47

Nevada Test Site National Emission Standards for Hazardous Air Pollutants Calendar Year 2008  

SciTech Connect

The Nevada Test Site (NTS) is operated by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office. From 1951 through 1992, the NTS was the continental testing location for U.S. nuclear weapons. The release of radionuclides from NTS activities has been monitored since the initiation of atmospheric testing. Limitation to under-ground detonations after 1962 greatly reduced radiation exposure to the public surrounding the NTS. After nuclear testing ended in 1992, NTS radiation monitoring focused on detecting airborne radionuclides from historically contaminated soils. These radionuclides are derived from re-suspension of soil (primarily by winds) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of tritium were also emitted to air at the North Las Vegas Facility (NLVF), an NTS support complex in the city of North Las Vegas. To protect the public from harmful levels of man-made radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP) (Title 40 Code of Federal Regulations [CFR] Part 61 Subpart H) (CFR, 2008a) limits the release of radioactivity from a U.S. Department of Energy facility (e.g., the NTS) to 10 millirem per year (mrem/yr) effective dose equivalent to any member of the public. This limit does not include radiation not related to NTS activities. Unrelated doses could come from naturally occurring radioactive elements or from other man-made sources such as medical treatments. The NTS demonstrates compliance with the NESHAP limit by using environmental measurements of radionuclide air concentrations at critical receptor locations. This method was approved by the U.S. Environmental Protection Agency for use on the NTS in 2001 and has been the sole method used since 2005. Six locations on the NTS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are actually pseudo-critical receptor stations, because no member of the public actually resides at these onsite locations. Compliance is demonstrated if the measured annual average concentration of each detected radionuclide at each of these locations is less than the NESHAP Concentration Levels (CLs) for Environmental Compliance listed in 40 CFR 61, Appendix E, Table 2 (CFR, 2008a). At any one location, if multiple radionuclides are detected then compliance with NESHAP is demonstrated when the sum of the fractions (determined by dividing each radionuclide's concentration by its CL and then adding the fractions together) is less than 1.0. In 2008, the potential dose from radiological emissions to air, from both current and past NTS activities, at onsite compliance monitoring stations was a maximum of 1.9 mrem/yr; well below the 10 mrem/yr dose limit. Air sampling data collected at all six pseudo-critical receptor stations had average concentrations of radioactivity that were a fraction of the CL values listed in Table 2 in Appendix E of 40 CFR 61 (CFR, 2008a). Concentrations ranged from less than 1 percent to a maximum of 19 percent of the allowed NESHAP limit. Because the nearest member of the public resides approximately 20 kilometers (12 miles) from the NTS boundary, concentrations at this location would be only a small fraction of that measured on the NTS. Potential dose to the public from NLVF was also very low at 0.00006 mrem/yr; more than 160,000 times lower than the 10 mrem/yr limit.

Ronald Warren and Robert F. Grossman

2009-06-30T23:59:59.000Z

48

Calendars and Software  

Science Conference Proceedings (OSTI)

Meteorologists need to be able to manipulate arbitrary dates in the past, present, and future. Here calendar rules for both the Julian (old) and Gregorian (modern) calendars are reviewed. The author describes free software available online to ...

Jon E. Ahlquist

2000-01-01T23:59:59.000Z

49

The Nevada Test Site as a Lunar Analog Test Area  

Science Conference Proceedings (OSTI)

The Nevada Test Site (NTS) is a large (1,350 square miles) secure site currently operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy and was established in 1951 to provide a venue for testing nuclear weapons. Three areas with a variety of elevation and geological parameters were used for testing, but the largest number of tests was in Yucca Flat. The Yucca Flat area is approximately 5 miles wide and 20 miles long and approximately 460 subsidence craters resulted from testing in this area. The Sedan crater displaced approximately 12 million tons of earth and is the largest of these craters at 1,280 feet across and 320 feet deep. The profiles of Sedan and the other craters offer a wide variety of shapes and depths that are ideally suited for lunar analog testing.

Sheldon Freid

2007-02-13T23:59:59.000Z

50

ARM - NSA Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

the Site Images Information for Guest Scientists Contacts NSA Calendar Alan JensenTower Systems Tower inspection, maintenance and installation of lighting kit 2013.10.02 ...

51

Flow Test At Colrado Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Colrado Area (DOE GTP) Exploration Activity Details Location Colado Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

52

100 area excavation treatability test plan  

SciTech Connect

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications.

Not Available

1993-05-01T23:59:59.000Z

53

200 Area treated effluent disposal facility operational test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These completed operational testing activities demonstrated the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-03-01T23:59:59.000Z

54

Diversity Events Calendar  

Energy.gov (U.S. Department of Energy (DOE))

Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at...

55

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-01-12T23:59:59.000Z

56

200 Area treated effluent disposal facility operational test specification  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met.

Crane, A.F.

1995-02-02T23:59:59.000Z

57

Calendars | User Information | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Information: Calendars APS User Calendar Important meetings and general events of interest to the user community. General User Proposal (GUP) Calendar Deadlines, notification...

58

Flow Test At Wister Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Wister Area (DOE GTP) Exploration Activity Details Location Wister Area Exploration...

59

Flow Test At Maui Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Maui Area (DOE GTP) Exploration Activity Details Location Maui Area Exploration...

60

Aerial Photography At Nevada Test And Training Range Area (Sabin...  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aerial Photography At Nevada Test And...

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Geothermometry At Nevada Test And Training Range Area (Sabin...  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Nevada Test And...

62

Nevada Test And Training Range Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Nevada Test And Training Range Geothermal Area Nevada Test And Training Range Geothermal Area (Redirected from Nevada Test And Training Range Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Nevada Test And Training Range Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (5) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content

63

200 area effluent treatment facility opertaional test report  

Science Conference Proceedings (OSTI)

This document reports the results of the 200 Area Effluent Treatment Facility (200 Area ETF) operational testing activities. These Operational testing activities demonstrated that the functional, operational and design requirements of the 200 Area ETF have been met and identified open items which require retesting.

Crane, A.F.

1995-10-26T23:59:59.000Z

64

Nevada Test And Training Range Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Nevada Test And Training Range Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Nevada Test And Training Range Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (5) 10 References Area Overview Geothermal Area Profile Location: Nevada Exploration Region: Northern Basin and Range Geothermal Region GEA Development Phase: 2008 USGS Resource Estimate Mean Reservoir Temp: Estimated Reservoir Volume: Mean Capacity: Click "Edit With Form" above to add content

65

Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Exploration Activity Details...

66

Flow Test At Alum Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Alum Geothermal Area (DOE GTP) Exploration Activity Details Location Alum Geothermal...

67

Geodetic Survey At Nevada Test And Training Range Area (Sabin...  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Geodetic Survey At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL...

68

Idaho Cleanup Project completes work at Test Area North complex...  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Cleanup Project completes work at Test Area North complex at DOEs Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all...

69

Injectivity Test At Raft River Geothermal Area (1979) | Open Energy  

Open Energy Info (EERE)

Injectivity Test At Raft River Geothermal Area (1979) Injectivity Test At Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Injectivity Test Activity Date 1979 Usefulness useful DOE-funding Unknown Notes Quantification of the pressure response prior to 600 minutes is not always possible. Short-duration (< 24-hour) injection or pump tests are conducted with the drilling rig equipment, and long-duration (21-day) injection and pump tests are then conducted with the permanent pumping facilities. References Allman, D. W.; Goldman, D.; Niemi, W. L. (1 January 1979) Evaluation of testing and reservoir parameters in geothermal wells at Raft

70

Nevada Test Site 2007 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site  

SciTech Connect

This report is a compilation of the groundwater sampling results from three monitoring wells located near the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS), Nye County, Nevada, for calendar year 2007. The NTS is an approximately 3,561 square kilometer (1,375 square mile) restricted-access federal installation located approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada (Figure 1). Pilot wells UE5PW-1, UE5PW-2, and UE5PW-3 are used to monitor the groundwater at the Area 5 RWMS (Figure 2). In addition to groundwater monitoring results, this report includes information regarding site hydrogeology, well construction, sample collection, and meteorological data measured at the Area 5 RWMS. The disposal of low-level radioactive waste and mixed low-level radioactive waste at the Area 5 RWMS is regulated by U.S. Department of Energy (DOE) Order 435.1, 'Radioactive Waste Management'. The disposal of mixed low-level radioactive waste is also regulated by the state of Nevada under the Resource Conservation and Recovery Act (RCRA) regulation Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities' (CFR, 1999). The format of this report was requested by the Nevada Division of Environmental Protection (NDEP) in a letter dated August 12, 1997. The appearance and arrangement of this document have been modified slightly since that date to provide additional information and to facilitate the readability of the document. The objective of this report is to satisfy any Area 5 RWMS reporting agreements between DOE and NDEP.

NSTec Environmental Management

2008-01-01T23:59:59.000Z

71

Geographic Information System At Nevada Test And Training Range Area  

Open Energy Info (EERE)

Geographic Information System At Nevada Test And Training Range Area Geographic Information System At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Geographic Information System Activity Date Usefulness not indicated DOE-funding Unknown Notes Nellis Air Force Range (NAFR) occupies over 3 million acres in southern Nevada (Figure 1). We recently assessed potential utility-grade geothermal resources and possible target areas for exploration by constructing a GIS of this area and applying the occurrence model ideas outlined above (ITSI, 2003; Sabin et al., 2004). We list below many of the factors considered.

72

Mobile digital calendars in knowledge work  

Science Conference Proceedings (OSTI)

This article investigates the usage of mobile digital-calendar solutions in a knowledge work setting through the means of an empirical survey (n = 220) among managers and experts in a global telecommunications company. It is indicated, that the mobile digital ... Keywords: PIM, calendar use, digital calendars, electronic calendaring, electronic scheduling, global telecommunications, knowledge work, mobile calendars, mobile communications, mobile computing, personal information management

Anna Sell

2008-08-01T23:59:59.000Z

73

Battery Calendar Life Estimator Manual Modeling and Simulation  

SciTech Connect

The Battery Life Estimator (BLE) Manual has been prepared to assist developers in their efforts to estimate the calendar life of advanced batteries for automotive applications. Testing requirements and procedures are defined by the various manuals previously published under the United States Advanced Battery Consortium (USABC). The purpose of this manual is to describe and standardize a method for estimating calendar life based on statistical models and degradation data acquired from typical USABC battery testing.

Jon P. Christophersen; Ira Bloom; Ed Thomas; Vince Battaglia

2012-10-01T23:59:59.000Z

74

Tracer Testing At East Mesa Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

Tracer Testing At East Mesa Geothermal Area (1983) Tracer Testing At East Mesa Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At East Mesa Geothermal Area (1983) Exploration Activity Details Location East Mesa Geothermal Area Exploration Technique Tracer Testing Activity Date 1983 Usefulness not indicated DOE-funding Unknown Notes Two field experiments were conducted to develop chemical tracer procedures for use with injection-backflow testing, one on the fracture-permeability Raft River reservoir and the other on the matrix-permeability East Mesa reservoir. Results from tests conducted with incremental increases in the injection volume at both East Mesa and Raft River suggests that, for both reservoirs, permeability remained uniform with increasing distance from the

75

Stress Test At Coso Geothermal Area (2004) | Open Energy Information  

Open Energy Info (EERE)

Stress Test At Coso Geothermal Area (2004) Stress Test At Coso Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Stress Test At Coso Geothermal Area (2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Stress Test Activity Date 2004 Usefulness not indicated DOE-funding Unknown Exploration Basis EGS potential of Coso Geothermal Region Notes A hydraulic fracturing stress test at 3,703 feet TVD was used to constrain a normal faulting and strike-slip faulting stress tensor for this reservoir. The shear and normal stresses resolved on the fracture and fault planes were calculated and used to identify the subset of critically stressed planes that act to maintain permeability within the Coso Geothermal Field. References

76

Flow Test At Coso Geothermal Area (1978) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Coso Geothermal Area (1978) Flow Test At Coso Geothermal Area (1978) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Flow Test Activity Date 1978 Usefulness not indicated DOE-funding Unknown Notes Flow tests of well CGEH No. 1 were conducted. LBL performed eight temperature surveys after completion of the well to estimate equilibrium reservoir temperatures. Downhole fluid samples were obtained by the U.S. Geological Survey (USGS) and Lawrence Berkeley Laboratory (LBL), and a static pressure profile was obtained. The first test began September 5, 1978 using nitrogen stimulation to initiate flow; this procedure resulted in small flow and subsequent filling of the bottom hole with drill cuttings. The second test, on November 2, 1978, utilized a nitrogen-foam-water mixture to clean residual particles from bottom hole,

77

Tracer Testing At Coso Geothermal Area (1993) | Open Energy Information  

Open Energy Info (EERE)

Tracer Testing At Coso Geothermal Area (1993) Tracer Testing At Coso Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Coso Geothermal Area (1993) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Tracer Testing Activity Date 1993 Usefulness useful DOE-funding Unknown Exploration Basis To determine the steam and water mass flow rate Notes The method involves precisely metered injection of liquid and vapor phase tracers into the two-phase production pipeline and concurrent sampling of each phase downstream of the injection point. Subsequent chemical analysis of the steam and water samples for tracer content enables the calculation of mass flowrate for each phase given the known mass injection rates of

78

Tracer Testing At Coso Geothermal Area (2006) | Open Energy Information  

Open Energy Info (EERE)

Tracer Testing At Coso Geothermal Area (2006) Tracer Testing At Coso Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Coso Geothermal Area (2006) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Tracer Testing Activity Date 2006 Usefulness useful DOE-funding Unknown Exploration Basis To characterize the flow patterns of fluid injected into well 68-20RD. Notes A conservative liquid phase tracer, 2-naphthalene sulfonate, and a two-phase tracer, ethanol, were injected into well 68-20RD. Surrounding production wells were sampled over the subsequent 125 days and analyzed for the two tracers. The results demonstrate the efficacy of the simultaneous use of liquid-phase and two-phase tracers in fluid-depleted geothermal

79

CALENDAR YEAR 2011 ANNUAL SECURITY  

E-Print Network (OSTI)

CALENDAR YEAR 2011 ANNUAL SECURITY FIRE SAFETY REPORT& #12;University of North Dakota Annual Security & Fire Safety Report: Calendar Year 2011 n Page 1 Dear Community Member: I am pleased to introduce the 2011 Annual Security and Fire Safety Report for the University of North Dakota. This report

Delene, David J.

80

Tracer Testing At Raft River Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

3) 3) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Tracer Testing Activity Date 1983 Usefulness not indicated DOE-funding Unknown Exploration Basis To develop chemical tracing procedures for geothermal areas. Notes Two field experiments were conducted to develop chemical tracer procedures for use with injection-backflow testing, one on the fracture-permeability Raft River reservoir and the other on the matrix-permeability East Mesa reservoir. Results from tests conducted with incremental increases in the injection volume at both East Mesa and Raft River suggests that, for both reservoirs, permeability remained uniform with increasing distance from the well bore. Increased mixing during quiescent periods, between injection and

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Home Area Network Test, Evaluation, and Diagnostics Tools  

Science Conference Proceedings (OSTI)

This report provides a detailed description of a set of tools that may be used for evaluation of the communication quality of Home Area Networks (HANs). The development of these tools is a continuation of work begun in 2008 and documented in EPRI report 1020106, "Home Area Network Performance Metrics and Monitoring." This report presents advancements and modifications made during 2011 to extend the capabilities of these test tools for a range of applications. This report also introduces hardware and soft...

2011-12-20T23:59:59.000Z

82

Marysville Test Well Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Test Well Geothermal Area Test Well Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Marysville Test Well Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.75333333,"lon":-112.3766667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

83

Radiation Portal Monitoring Test Area and Large Detector  

E-Print Network (OSTI)

a transformation. In the summer of 2007, work began on the nearly 200,000-square-foot Physical Sciences Facility, equipment and staff displaced from accelerated cleanup of Hanford's 300 Area. This federally financed detection and testing · Borderandinterdiction technology · Materialsdevelopmentand engineering

84

Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000  

Science Conference Proceedings (OSTI)

Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit [CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C.

K. B. Campbell

2001-06-01T23:59:59.000Z

85

Tracer Testing At Coso Geothermal Area (2004) | Open Energy Information  

Open Energy Info (EERE)

Coso Geothermal Area (2004) Coso Geothermal Area (2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Tracer Testing Activity Date 2004 Usefulness not indicated DOE-funding Unknown Exploration Basis To determine the EGS potential of the Coso Geothermal Field Notes A dramatic decrease in the ratio of chloride to boron was observed in the liquid discharge of a well proposed for EGS development. The decrease appears to be related to the transformation of some feed zones in the well from liquid-dominated to vapor-dominated. High concentrations of boron are transported to the wellbore in the steam, where it fractionates to the liquid phase flowing in from liquid-dominated feed zones. The high-boron steam is created when the reservoir liquid in some of the feed zones boils

86

An Aerial Radiological Survey of Selected Areas of Area 18 - Nevada Test Site  

Science Conference Proceedings (OSTI)

As part of the proficiency training for the Radiological Mapping mission of the Aerial Measuring System (AMS), a survey team from the Remote Sensing Laboratory-Nellis (RSL-Nellis) conducted an aerial radiological survey of selected areas of Area 18 of the Nevada Test Site (NTS) for the purpose of mapping man-made radiation deposited as a result of the Johnnie Boy and Little Feller I tests. The survey area centered over the Johnnie Boy ground zero but also included the ground zero and deposition area of the Little Feller I test, approximately 7,000 feet (2133 meters) southeast of the Johnnie Boy site. The survey was conducted in one flight. The completed survey covered a total of 4.0 square miles. The flight lines (with the turns) over the surveyed areas are presented in Figure 1. One 2.5-hour-long flight was performed at an altitude of 100 ft above ground level (AGL) with 200 foot flight-line spacing. A test-line flight was conducted near the Desert Rock Airstrip to ensure quality control of the data. The test line is not shown in Figure 1. However, Figure 1 does include the flight lines for a ''perimeter'' flight. The path traced by the helicopter flying over distinct roads within the survey area can be used to overlay the survey data on a base map or image. The flight survey lines were flown in an east-west orientation perpendicular to the deposition patterns for both sites. This technique provides better spatial resolution when contouring the data. The data were collected by the AMS data acquisition system (REDAR V) using an array of twelve 2-inch x 4-inch x 16-inch sodium iodide (NaI) detectors flown on-board a twin-engine Bell 412 helicopter. Data, in the form of gamma energy spectra, were collected every second over the course of the survey and were geo-referenced using a differential Global Positioning System. Spectral data allows the system to distinguish between ordinary fluctuations in natural background radiation levels and the signature produced by man-made radioisotopes. Spectral data can also identify specific radioactive isotopes. Based on the results of the RSL NTS 1994 surveys, this area was chosen for a resurvey to improve the spatial resolution of the reported depositions for the Johnnie Boy and Little Feller I events. In addition, the survey was expected to confirm the absence of detectable concentrations of Americium-241 (Am-241) at the Johnnie Boy site and attempt to confirm the presence of Uranium-235 (U-235).

Craig Lyons

2009-07-31T23:59:59.000Z

87

An X-Band Gun Test Area at SLAC  

SciTech Connect

The X-Band Test Area (XTA) is being assembled in the NLCTA tunnel at SLAC to serve as a test facility for new RF guns. The first gun to be tested will be an upgraded version of the 5.6 cell, 200 MV/m peak field X-band gun designed at SLAC in 2003 for the Compton Scattering experiment run in ASTA. This new version includes some features implemented in 2006 on the LCLS gun such as racetrack couplers, increased mode separation and elliptical irises. These upgrades were developed in collaboration with LLNL since the same gun will be used in an injector for a LLNL Gamma-ray Source. Our beamline includes an X-band acceleration section which takes the electron beam up to 100 MeV and an electron beam measurement station. Other X-Band guns such as the UCLA Hybrid gun will be characterized at our facility.

Limborg-Deprey, C.; Adolphsen, C.; Chu, T.S.; Dunning, M.P.; Jobe, R.K.; Jongewaard, E.N.; Hast, C.; Vlieks, A.E.; Wang, F.; Walz, D.R.; /SLAC; Marsh, R.A.; Anderson, S.G.; Hartemann, F.V.; Houck, T.L.; /LLNL, Livermore

2012-09-07T23:59:59.000Z

88

An update for the MuCool test area  

DOE Green Energy (OSTI)

Construction of a new facility known as the MuCool Test Area (MTA) has been completed at Fermi National Accelerator Laboratory. This facility supports research in new accelerator technologies for future endeavors such as a Neutrino Factory or Muon Collider. During the summer of 2004, an initial set of tests was completed for the filling of a convection-style liquid hydrogen absorber designed by KEK. The absorber contained 6.2 liquid liters of hydrogen and was tested for a range of heating conditions to quantify the absorber's heat exchanger performance. Future work at Fermilab includes the design, construction, and installation of a forced-flow absorber to be used with other components built to investigate the properties of a muon ionization cooling channel. A Tevatron-style refrigerator/compressor building is to be operational by spring of 2006 in support of the absorber tests and also to provide 5-K helium and liquid nitrogen to a 5-T solenoid magnet, an active element of the future test apparatus. The refrigerator will be configured in such a manner as to meet the 5 K and 14-20-K helium needs of the MTA. This paper reviews the challenges and successes of the past KEK absorber tests as well as looks into the future cryogenic capabilities and intentions of the site.

Bross, A.; Cummings, M.A.; Darve, C.; Ishimoto, S.; Klebaner, A.; Martinez, A.; Norris, B.; Pei, L.; /Fermilab /KEK, Tsukuba /Northern Illinois U.

2006-01-01T23:59:59.000Z

89

100 Area excavation treatability test plan. Revision 1  

SciTech Connect

This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd{sub 3} of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative.

Not Available

1993-08-01T23:59:59.000Z

90

Hanford 100-D Area Biostimulation Treatability Test Results  

SciTech Connect

Pacific Northwest National Laboratory conducted a treatability test designed to demonstrate that in situ biostimulation can be applied to help meet cleanup goals in the Hanford Site 100-D Area. In situ biostimulation has been extensively researched and applied for aquifer remediation over the last 20 years for various contaminants. In situ biostimulation, in the context of this project, is the process of amending an aquifer with a substrate that induces growth and/or activity of indigenous bacteria for the purpose of inducing a desired reaction. For application at the 100-D Area, the purpose of biostimulation is to induce reduction of chromate, nitrate, and oxygen to remove these compounds from the groundwater. The in situ biostimulation technology is intended to provide supplemental treatment upgradient of the In Situ Redox Manipulation (ISRM) barrier previously installed in the Hanford 100-D Area and thereby increase the longevity of the ISRM barrier. Substrates for the treatability test were selected to provide information about two general approaches for establishing and maintaining an in situ permeable reactive barrier based on biological reactions, i.e., a biobarrier. These approaches included 1) use of a soluble (miscible) substrate that is relatively easy to distribute over a large areal extent, is inexpensive, and is expected to have moderate longevity; and 2) use of an immiscible substrate that can be distributed over a reasonable areal extent at a moderate cost and is expected to have increased longevity.

Truex, Michael J.; Vermeul, Vincent R.; Fritz, Brad G.; Mackley, Rob D.; Mendoza, Donaldo P.; Elmore, Rebecca P.; Mitroshkov, Alexandre V.; Sklarew, Deborah S.; Johnson, Christian D.; Oostrom, Martinus; Newcomer, Darrell R.; Brockman, Fred J.; Bilskis, Christina L.; Hubbard, Susan S.; Peterson, John E.; Williams, Kenneth H.; Gasperikova, E.; Ajo-Franklin, J.

2009-09-30T23:59:59.000Z

91

Flow Test At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

92

Flow Test At Glass Buttes Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Glass Buttes Area (DOE GTP) Exploration Activity Details Location Glass Buttes Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

93

Flow Test At The Needles Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At The Needles Area (DOE GTP) Exploration Activity Details Location The Needles Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

94

Flow Test At Mccoy Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Mccoy Geothermal Area (DOE GTP) Exploration Activity Details Location Mccoy Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated...

95

Flow Test At Gabbs Valley Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Gabbs Valley Area (DOE GTP) Exploration Activity Details Location Gabbs Valley Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

96

Tracer Testing At Jemez Pueblo Area (DOE GTP) | Open Energy Informatio...  

Open Energy Info (EERE)

Tracer Testing At Jemez Pueblo Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Jemez Pueblo Area (DOE GTP)...

97

2000 TMS Annual Meeting: Calendar of Events  

Science Conference Proceedings (OSTI)

2000 TMS Fall Meeting: Calendar of Events ... development, and application of new materials processes, analysis techniques, and equipment advances.

98

PEROXIDE DESTRUCTION TESTING FOR THE 200 AREA EFFLUENT TREATMENT FACILITY  

Science Conference Proceedings (OSTI)

The hydrogen peroxide decomposer columns at the 200 Area Effluent Treatment Facility (ETF) have been taken out of service due to ongoing problems with particulate fines and poor destruction performance from the granular activated carbon (GAC) used in the columns. An alternative search was initiated and led to bench scale testing and then pilot scale testing. Based on the bench scale testing three manganese dioxide based catalysts were evaluated in the peroxide destruction pilot column installed at the 300 Area Treated Effluent Disposal Facility. The ten inch diameter, nine foot tall, clear polyvinyl chloride (PVC) column allowed for the same six foot catalyst bed depth as is in the existing ETF system. The flow rate to the column was controlled to evaluate the performance at the same superficial velocity (gpm/ft{sup 2}) as the full scale design flow and normal process flow. Each catalyst was evaluated on peroxide destruction performance and particulate fines capacity and carryover. Peroxide destruction was measured by hydrogen peroxide concentration analysis of samples taken before and after the column. The presence of fines in the column headspace and the discharge from carryover was generally assessed by visual observation. All three catalysts met the peroxide destruction criteria by achieving hydrogen peroxide discharge concentrations of less than 0.5 mg/L at the design flow with inlet peroxide concentrations greater than 100 mg/L. The Sud-Chemie T-2525 catalyst was markedly better in the minimization of fines and particle carryover. It is anticipated the T-2525 can be installed as a direct replacement for the GAC in the peroxide decomposer columns. Based on the results of the peroxide method development work the recommendation is to purchase the T-2525 catalyst and initially load one of the ETF decomposer columns for full scale testing.

HALGREN DL

2010-03-12T23:59:59.000Z

99

Field investigation at the Faultless Site Central Nevada Test Area  

DOE Green Energy (OSTI)

An evaluation of groundwater monitoring at non-Nevada Test Site underground nuclear test sites raised questions about the potential for radionuclide migration from the Faultless event and how to best monitor for such migration. With its long standing interest in the Faultless area and background in Nevada hydrogeology, the Desert Research Institute conducted a field investigation in FY92 to address the following issues: The status of chimney infilling (which determines the potential for migration); the best level(s) from which to collect samples from the nearby monitoring wells, HTH-1 and HTH-2; the status of hydraulic heads in the monitoring well area following records of sustained elevated post-shot heads. The field investigation was conducted from July 27 to 31 and August 4 to 7, 1992. Temperature and electrical conductivity logging were performed in HTH-1, HTH-2, and UC-1-P-2SR. Water samples were collected from HTH-1 and HTH-2. Lawrence Livermore National Laboratory (LLNL) also collected samples during the July trip, including samples from UC-1-P-2SR. This report presents the data gathered during these field excursions and some preliminary conclusions. Full interpretation of the data in light of the issues listed above is planned for FY93.

Chapman, J.B.; Mihevc, T.M.; Lyles, B.

1992-11-01T23:59:59.000Z

100

Test Switch: n  

U.S. Energy Information Administration (EIA)

Test Switch: n. struct; Message [empty string] StackTrace: java.lang.NullPointerException at java.util.Calendar.setTime(Calendar.java:1075) at coldfusion.util. ...

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Massive Hanford Test Reactor Removed- Plutonium Recycle Test Reactor removed from Hanfords 300 Area  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, WA Hanfords River Corridor contractor, Washington Closure Hanford, has met a significant cleanup challenge on the U.S. Department of Energys (DOE) Hanford Site by removing a 1,082-ton nuclear test reactor from the 300 Area.

102

CALENDAR OF EVENTS  

Science Conference Proceedings (OSTI)

Feb 28, 2006 ... Bridge Hall, Level 1. TMS MEMBERSHIP AREA. 11 a.m. to 6 p.m.. C. Outside Exhibit Hall C, Level 1. TMS PUBLICATIONS SALES. 11 a.m. to 6...

103

Cryogenics for the MuCool Test Area (MTA)  

DOE Green Energy (OSTI)

MuCool Test Area (MTA) is a complex of buildings at Fermi National Accelerator Laboratory, which are dedicated to operate components of a cooling cell to be used for Muon Collider and Neutrino Factory R&D. The long-term goal of this facility is to test ionization cooling principles by operating a 25-liter liquid hydrogen (LH{sub 2}) absorber embedded in a 5 Tesla superconducting solenoid magnet. The MTA solenoid magnet will be used with RF cavities exposed to a high intensity beam. Cryogens used at the MTA include LHe, LN{sub 2} and LH{sub 2}. The latter dictates stringent system design for hazardous locations. The cryogenic plant is a modified Tevatron refrigerator based on the Claude cycle. The implementation of an in-house refrigerator system and two 300 kilowatt screw compressors is under development. The helium refrigeration capacity is 500 W at 14 K. In addition the MTA solenoid magnet will be batch-filled with LHe every 2 days using the same cryo-plant. This paper reviews cryogenic systems used to support the Muon Collider and Neutrino Factory R&D programs and emphasizes the feasibility of handling cryogenic equipment at MTA in a safe manner.

Darve, Christine; Norris, Barry; Pei, Liu-Jin; /Fermilab

2005-09-01T23:59:59.000Z

104

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 29 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

105

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of February 3 2014 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 3 4 5 6 7 8 9 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

106

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, August 7 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

107

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Saturday, August 10 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013

108

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Tuesday, August 6 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

109

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Saturday, August 31 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

110

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, August 14 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013

111

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev March 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 9 1 2 3 10 4 5 6 7 8 9 10 11 11 12 13 14 15 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 16 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 17 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 12 18 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 19 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 20 LEED Certification Training & Attaintment

112

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of September 2 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 2 3 4 5 6 7 8 All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST

113

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Friday, August 30 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

114

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 8 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

115

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Tuesday, August 27 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013 ICCE 2013: International Conference & Exhibition on Clean Energy

116

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, August 28 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

117

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev April 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 14 1 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 2 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 3 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 4 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 5 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day) 6 LEED Certification Training & Attaintment 15 Mar 2013 (All day) - 15 Apr 2013 (All day)

118

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Friday, August 9 2013 Next » Time Items All day All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

119

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Saturday, August 17 2013 Next » Time Items All day All times DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

120

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 1 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013 ICCE 2013: International Conference & Exhibition on Clean Energy

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Wednesday, January 1 2014 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013

122

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Monday, September 2 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

123

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of January 1 2014 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31 1 2 3 4 5 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

124

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Monday, August 5 2013 Next » Items Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg Groups: Clean and Renewable Energy Sep 8 2013 ICCE 2013: International Conference & Exhibition on Clean Energy

125

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of July 29 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 29 30 31 1 2 3 4 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

126

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Friday, August 16 2013 Next » Time Items All day All times DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

127

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Sunday, August 18 2013 Next » Time Items All day All times DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

128

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Thursday, August 15 2013 Next » Time Items All day 13:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location:

129

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Tuesday, September 3 2013 Next » Time Items All day All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech

130

Flow Test At Fish Lake Valley Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Fish Lake Valley Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Fish Lake Valley Area (DOE GTP) Exploration Activity...

131

Flow Test At Rye Patch Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Rye Patch Area (DOE GTP) Exploration Activity Details Location Rye Patch Area...

132

Flow Test At Jemez Pueblo Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Jemez Pueblo Area (DOE GTP) Exploration Activity Details Location Jemez Pueblo Area...

133

Flow Test At Silver Peak Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Silver Peak Area (DOE GTP) Exploration Activity Details Location Silver Peak Area...

134

Flow Test At New River Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At New River Area (DOE GTP) Exploration Activity Details Location New River Area...

135

Flow Test At Hot Pot Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Pot Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Hot Pot Area (DOE GTP) Exploration Activity Details Location Hot...

136

Calendar Year 2008 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Calendar Year 2008 RSS December 23, 2008 Special Report: IG-0808 Management Challenges at the Department of Energy December 11, 2008 Inspection Report: INS-O-09-01 Security Clearances at Lawrence Livermore National Laboratory and Sandia National Laboratory-California December 9, 2008 Audit Report: IG-0807 Cyber Security Risk Management Practices at the Bonneville Power Administration November 25, 2008 Inspection Report: IG-0806 40 MM Grenade Launcher Qualification Requirements at Department of Energy Sites November 20, 2008 Audit Report: IG-0805 Cyber Security Risk Management Practice at the Southeastern, Southwestern, and Western AreaPower Administrations November 19, 2008 Inspection Summary Report Issues Related to the Production of Components for the W76 Weapon System

137

D0 Experimental Area Emergency Backup Power and Generator Test  

SciTech Connect

The DO experimental area has a generator designated as emergency power. This generator provides power for critical loads and starts automatically upon loss of commercial power. This note concerns the testing of this generator. A list of loads is attached to this note. One of the loads on the emergency power grid is a 10KVA Uninterruptable Power Supply(UPS). The UPS powers the cryogenic controls and Oxygen deficiency hazard equipment(ODH) and has a minimum rating of 20 minutes while on its batteries(to cover the transfer time to/from the emergency generator). Jan 23,1991 at 1640 hrs this system was tested under the supervision of the Terry Ross, Marv Johnson, Dan Markley, Kelly Dixon, and John Urbin. The power feeder to the emergency power grid at DO was disconnected. The generator responded immediately and was supplying power to the emergency power grid in less than 10 seconds. During the 10 seconds that there was no power on the emergency grid the UPS switched on its inverter and provided uninterrupted power to the cryogenic control system and the ODH system. All of the motorized equipment shut off instrument air compressor, vacuum pumps 1 and 2, insulating vacuum blower, glycol cooling pumps, cooling tower fan, and Exhaust Fan 7(EF7). Upon reengagement of power to the grid from the emergency generator, all of the motorized loads started back up with the exception of vacuum pumps 1 and 2, and the UPS inverter turned off. Vacuum pumps 1 and 2 were delay started 20 seconds by the cryogenic control system as not to cause too large of a surge in power by all of the inductive loads starting at once. The DO building elevator which is also on emergency power was test run while the emergency generator was on line with all other emergency loads. The emergency generator current was 140 amps with all loads on line and running except the building elevator. This load of 140 amps is 27% of the generator's capacity. The cryogenic control and ODH system continued to function properly throughout the entire test due to the UPS responding correctly to each power situation. The cryogenic control system isolated both the Utility(UV) and insulating(IV) vacuum systems as to preserve their vacua while the pumps were off. Once the vacuum pumps were reestablished the IV and UV vacua were put back on line to their respective pumps by the cryogenic control system. The instrument air is backed up by a high pressure trailer, regulated down to instrument air pressure and switches automatically on line through a check valve. During the time that the instrument air compressor was off, instrument air never went below 80 psig (high pressure regulator setting).

Markley, D.; /Fermilab

1991-01-24T23:59:59.000Z

138

D0 Experimental Area Emergency Backup Power and Generator Test  

SciTech Connect

The DO experimental area has a generator designated as emergency power. This generator provides power for critical loads and starts automatically upon loss of commercial power. This note concerns the testing of this generator. A list of loads is attached to this note. One of the loads on the emergency power grid is a 10KVA Uninterruptable Power Supply(UPS). The UPS powers the cryogenic controls and Oxygen deficiency hazard equipment(ODH) and has a minimum rating of 20 minutes while on its batteries(to cover the transfer time to/from the emergency generator). Jan 23,1991 at 1640 hrs this system was tested under the supervision of the Terry Ross, Marv Johnson, Dan Markley, Kelly Dixon, and John Urbin. The power feeder to the emergency power grid at DO was disconnected. The generator responded immediately and was supplying power to the emergency power grid in less than 10 seconds. During the 10 seconds that there was no power on the emergency grid the UPS switched on its inverter and provided uninterrupted power to the cryogenic control system and the ODH system. All of the motorized equipment shut off instrument air compressor, vacuum pumps 1 and 2, insulating vacuum blower, glycol cooling pumps, cooling tower fan, and Exhaust Fan 7(EF7). Upon reengagement of power to the grid from the emergency generator, all of the motorized loads started back up with the exception of vacuum pumps 1 and 2, and the UPS inverter turned off. Vacuum pumps 1 and 2 were delay started 20 seconds by the cryogenic control system as not to cause too large of a surge in power by all of the inductive loads starting at once. The DO building elevator which is also on emergency power was test run while the emergency generator was on line with all other emergency loads. The emergency generator current was 140 amps with all loads on line and running except the building elevator. This load of 140 amps is 27% of the generator's capacity. The cryogenic control and ODH system continued to function properly throughout the entire test due to the UPS responding correctly to each power situation. The cryogenic control system isolated both the Utility(UV) and insulating(IV) vacuum systems as to preserve their vacua while the pumps were off. Once the vacuum pumps were reestablished the IV and UV vacua were put back on line to their respective pumps by the cryogenic control system. The instrument air is backed up by a high pressure trailer, regulated down to instrument air pressure and switches automatically on line through a check valve. During the time that the instrument air compressor was off, instrument air never went below 80 psig (high pressure regulator setting).

Markley, D.; /Fermilab

1991-01-24T23:59:59.000Z

139

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

140

Calendar Year 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

142

Joint Outreach Task Group Calendar: September 2013  

Energy.gov (U.S. Department of Energy (DOE))

Joint Outreach Task Group (JOTG)has created a monthly calendar of community events to facilitate interagency and community involvement in these events. September 2013

143

NIST: A Walk Through Time - Ancient Calendars  

Science Conference Proceedings (OSTI)

... The earliest Egyptian calendar [Ref.] was based on the moon's cycles, but later the Egyptians realized that the "Dog Star" in Canis Major, which we ...

2010-10-05T23:59:59.000Z

144

Calendar Year 2009 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

145

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

146

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

147

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

148

Calendar Year Reports | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

149

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

150

Calendar Year 2000 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

151

Calendar Year 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

152

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

153

Calendar Year Reports Archive | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Archive Calendar Year Reports Archive October 3, 2013 Special Inquiry: DOEIG-0895 Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power...

154

NETL - ARRA Training Centers Course Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

ARRA Training Centers Course Calendar The Regional Carbon Sequestration Training Centers, funded by the American Recovery and Reinvestment Act of 2009 (ARRA), support the...

155

Calendar Year 2003 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Year 2003 Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan December 22, 2003...

156

EventMinder : a personal calendar assistant that understands events  

E-Print Network (OSTI)

Calendar applications do not understand calendar entries. This limitation prevents them from offering the range of assistance that can be provided by a human personal assistant. Understanding calendar entries is a difficult ...

Smith, Dustin Arthur

2007-01-01T23:59:59.000Z

157

Track NERSC Scheduled and Unscheduled Outages in Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Track NERSC Outages in Google Calendar Track NERSC Outages in Google Calendar March 22, 2013 by Jack Deslippe (0 Comments) Outages are now available in Google calendar form. You...

158

STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

NONE

2006-07-01T23:59:59.000Z

159

Post-Closure Inspection Report for Corrective Action Unit 426: Cactus Spring Waste Trenches Tonopah Test Range, Nevada Calendar Year 2000  

SciTech Connect

Post-closure monitoring requirements for the Cactus Spring Waste Trenches (Corrective Action Unit [CAW 426]) (Figure 1) are described in Closure Report for corrective Action Unit 426, Cactus Spring Waste Trenches. Tonopah Test Range, Nevada, report number DOE/NV--226. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 14, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 13, 1999. Post-closure monitoring at CAU 426 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 19, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR, and were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2001-06-01T23:59:59.000Z

160

Annual Site Environmental Report Calendar Year 2010  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2010. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. In 2010, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local regulations and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2010. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2010. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2010. Included in these efforts were battery and CRT recycling, miscellaneous electronic office equipment, waste white paper and green computer paper-recycling and corrugated cardboard recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, foamed polystyrene peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Performance Evaluation Measurement Plan, on its Affirmative Procurement Performance Measure. A performance level of 'A-' was achieved in 2010 for Integrated Safety, Health and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System (EMS) has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts. The Laboratory's EMS was audited in April 2009 by DOE-CH. There were four 'Sufficiently in Conformity' findings as a result of the audit. All four findings were tracked in the Laboratory's corrective action database for completion. Beryllium was used routinely at Ames Laboratory in the 1940's and 1950's in processes developed for the production of highly pure uranium and thorium in support of the historic Manhattan Project. Laboratory metallurgists also worked on a process to produce pure beryllium metal from beryllium fluoride. In the early 1950's, beryllium oxide powder was used to produce shaped beryllium and crucibles. As a result of that work, beryllium contamination now exists in many interstitial spaces (e.g., utility chases) and ventilation systems in Wilhelm, Spedding and Metals Development buildings. Extensive characterization and remediation efforts have occurred in 2009 and 2010 in order to better understand the extent of the contamination. Analysis of extensive sampling data suggests that a fairly wide dispersion of beryllium occurred (most likely in the 1950's and 60's) in Wilhelm Hall and in certain areas of Spedding Hall and Metals Development. Area air-sampling results and work-area surface characterizations indicate the exposure potential to current workers, building visitors and the public remains extremely low. This information is now used to guide cleaning efforts and to provide worker protection during remodeling and maintenance activities. Results were shared with the DOE's Former Worker Program to support former worker medical test

Kayser, Dan

2011-01-31T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Post-Closure Inspection Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench Tonopah Test Range, Nevada, Calendar Year 2001  

Science Conference Proceedings (OSTI)

Post-closure monitoring requirements for the Roller Coaster Lagoons and Trench (Corrective Action Unit [CAU] 404) (Figure 1) are described in Closure Report for Corrective Action Unit 404. Roller Coaster Sewage Lagoons and North Disposal Trench. Tonopah Test Range. Nevada, report number DOE/NV--187, September 1998. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on September 11, 1998. Permeability results of soils adjacent to the engineered cover and a request for closure of CAU 404 were transmitted to the NDEP on April 29, 1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on May 18, 1999. As stated in Section 5.0 of the NDEP-approved CRY post-closure monitoring at CAU 404 consists of the following: (1) Visual site inspections done twice a year to evaluate the condition of the cover and plant development. (2) Verification that the site is secure and condition of the fence and posted warning signs. (3) Notice of any subsidence, erosion, unauthorized excavation, etc., deficiencies that may compromise the integrity of the unit. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. In addition to the above activities, vegetative monitoring of the cover (a plant census) will be done in the first, third and fifth year following revegetation. (Vegetative monitoring will done in fiscal year 2001, and the results reported in the 2002 Post-Closure Inspection Report.) Site inspections were conducted on May 16, 2001, and November 6, 2001. The site inspections were conducted after completion of the revegetation activities (October 30, 1997) and NDEP approval of the CR (May 18, 1999). All site inspections were conducted in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and copies of the inspection photographs are found in Attachment C.

K. B. Campbell

2002-01-01T23:59:59.000Z

162

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in...

163

Microsoft Word - Sludge Test Area CX Determination Form12172012  

NLE Websites -- All DOE Office Websites (Extended Search)

Sludge Test Facility at the Transuranic (TRU) Waste Processing Center (TWPC) [CX-TWPC-13-0001] Sludge Test Facility at the Transuranic (TRU) Waste Processing Center (TWPC) [CX-TWPC-13-0001] Program or Field Office: Environmental Management - Oak Ridge Location(s) (City/County/State): Oak Ridge, Tennessee Proposed Action Description: The proposed action is to construct and operate a sludge test facility at the Transuranic (TRU) Waste Processing Center (TWPC) to conduct testing activities for sludge mobilization, mixing, and removal from the Melton Valley Storage Tanks (MVST). The testing is needed to develop appropriate, compliant treatment to a final waste form that will meet the Nevada National Security Site (NNSS) Waste Acceptance Criteria (WAC). This testing is needed for the mobilization, removal, and treatment of the sludge regardless of

164

Calendar Life Studies of Advanced Technology Development Program Gen 1 Lithium Ion Batteries  

SciTech Connect

This report presents the test results of a special calendar-life test conducted on 18650-size, prototype, lithium-ion battery cells developed to establish a baseline chemistry and performance for the Advanced Technology Development Program. As part of electrical performance testing, a new calendar-life test protocol was used. The test consisted of a once-per-day discharge and charge pulse designed to have minimal impact on the cell yet establish the performance of the cell over a period of time such that the calendar life of the cell could be determined. The calendar life test matrix included two states of charge (i.e., 60 and 80%) and four temperatures (40, 50, 60, and 70C). Discharge and regen resistances were calculated from the test data. Results indicate that both discharge and regen resistance increased nonlinearly as a function of the test time. The magnitude of the discharge and regen resistance depended on the temperature and state of charge at which the test was conducted. The calculated discharge and regen resistances were then used to develop empirical models that may be useful to predict the calendar life or the cells.

Wright, Randy Ben; Motloch, Chester George

2001-03-01T23:59:59.000Z

165

Nevada Test Site 2008 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites  

Science Conference Proceedings (OSTI)

Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site. These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2008 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities.

NSTec Environmental Management

2009-06-23T23:59:59.000Z

166

Proposal Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Calendar Proposal Calendar 2014 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2014-1 Fri Nov-1-13 Tue Nov-19-13 Tue Dec-10-13 ~Dec-18-13 Tue Jan-28-14 Tue Apr-21-14 2014-2 Fri Mar-7-14 Tue Mar-25-14 Tue Apr-8-14 ~Apr-21-14 ~ May-14 ~Aug-14 2014-3 Fri Jul-11-14 Tue Jul-29-14 Tue Aug-12-14 ~Aug-25-14 ~ Oct-14 ~Dec-14 2015 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends 2015-1 Fri Oct-31-14 Tue Nov-18-14 Tue Dec--2-14 ~Dec-14-14 ~Jan-15 ~Apr-15 2015-2 Fri Mar-6-15 Tue Mar-24-15 Tue Apr-7-15 ~Apr-20-15 ~ May-15 ~Aug-15 2015-3 Fri Jul-10-15 Tue Jul-28-15 Tue Aug-11-15 ~Aug-24-15 ~ Oct-15 ~Dec-15 2016 Run Cycle Proposal Deadline PRP BAC Notification Cycle Begins Cycle Ends

167

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev July 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 27 1 2 3 4 5 6 7 28 8 9 10 11 12 13 14 29 15 16 17 18 19 20 21 30 22 23 24 25 26 27 28 31 29 30 31 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT Groups: Renewable Energy RFPs Aug 15 2013 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST Groups: Renewable Energy RFPs Aug 5 2013 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT Groups: Renewable Energy RFPs 1 of 9 ›› Past events Oct 15 2013 Viridis Africa 2013 - investment in cleantech Location: Killarney Country Club, 60 5th street, Lower Houghton, Johannesburg

168

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev September 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 35 1 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 36 2 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 3 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 4 5 6 7 8 37 9 ICCE 2013: International Conference & Exhibition on Clean Energy 9 Sep 2013 (All day) - 11 Sep 2013 (All day) 10 ICCE 2013: International Conference & Exhibition on Clean Energy

169

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of August 12 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 12 13 14 15 16 17 18 Before 13:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 13:00 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013

170

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of August 26 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 26 27 28 29 30 31 1 All times Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00 Portland General Electic RFP--deadline for intent to bid September 3, 2013 at 5:00 PM PDT 28 Aug 2013 - 00:00 - 3 Sep 2013 - 17:00

171

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev August 2013 Next » Monday Tuesday Wednesday Thursday Friday Saturday Sunday 31 1 2 3 4 32 5 6 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 7 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 8 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 9 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 10 11 33 12 13 14 15 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST 15 Aug 2013 - 13:00 - 19 Aug 2013 - 12:00 16 DLA Energy RFP - Deadline: August 19, 2013 - 12:00pm EST

172

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev Week of August 5 2013 Next » Time Monday Tuesday Wednesday Thursday Friday Saturday Sunday All day 5 6 7 8 9 10 11 All times WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 WAPA REC RFP - Deadline: August 9, 2013 - 4:30 p.m. PT 6 Aug 2013 - 00:00 - 9 Aug 2013 - 16:30 Syndicate content Create content Recently added events Aug 27 2013 Portland General Electic RFP--deadline for intent to bid September 3, 2013

173

SRF Test Areas Cryogenic System Controls Graphical User Interface  

SciTech Connect

Fermi National Accelerator Laboratory has constructed a superconducting 1.3 GHz cavity test facility at Meson Detector Building (MDB) and a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab Building (NML). The control of these 2K cryogenic systems is accomplished by using a Synoptic graphical user interface (GUI) to interact with the underlying Fermilab Accelerator Control System. The design, testing and operational experience of employing the Synoptic client-server system for graphical representation will be discussed. Details on the Synoptic deployment to the MDB and NML cryogenic sub-systems will also be discussed. The implementation of the Synoptic as the GUI for both NML and MDB has been a success. Both facilities are currently fulfilling their individual roles in SCRF testing as a result of successful availability of the cryogenic systems. The tools available for creating Synoptic pages will continue to be developed to serve the evolving needs of users.

DeGraff, B.D.; Ganster, G.; Klebaner, A.; Petrov, A.D.; Soyars, W.M.; /Fermilab

2011-06-09T23:59:59.000Z

174

Recent Progress of RF Cavity Study at Mucool Test Area  

DOE Green Energy (OSTI)

Summar of presentation is: (1) MTA is a multi task working space to investigate RF cavities for R&D of muon beam cooling channel - (a) Intense 400 MeV H{sup -} beam, (b) Handle hydrogen (flammable) gas, (c) 5 Tesla SC solenoid magnet, (d) He cryogenic/recycling system; (2) Pillbox cavity has been refurbished to search better RF material - Beryllium button test will be happened soon; (3) E x B effect has been tested in a box cavity - Under study (result seems not to be desirable); (4) 201 MHz RF cavity with SRF cavity treatment has been tested at low magnetic field - (a) Observed some B field effect on maximum field gradient and (b) Further study is needed (large bore SC magnet will be delivered end of 2011); and (5) HPRF cavity beam test has started - (a) No RF breakdown observed and (b) Design a new HPRF cavity to investigate more plasma loading effect.

Yonehara, Katsuya; /Fermilab

2011-12-02T23:59:59.000Z

175

Flow Test At Raft River Geothermal Area (2008) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (2008) Flow Test At Raft River Geothermal Area (2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2008) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 2008 Usefulness not indicated DOE-funding Unknown Exploration Basis To confirm resource using flow tests Notes Both production and injection wells were flow tested. Aslo includes interference testing across the well field. References Glaspey, Douglas J. (30 January 2008) Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Raft_River_Geothermal_Area_(2008)&oldid=473856

176

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W35 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

177

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W31 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

178

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-07 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

179

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W34 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

180

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-08 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunitycontent...

182

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-09 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

183

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W33 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

184

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-W32 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

185

Calendar  

Open Energy Info (EERE)

http:en.openei.orgcommunitycontenteventscalendar2013-08-01 en Transportation Energy Futures Study: The Key Results and Conclusions Webinar http:en.openei.orgcommunity...

186

User Calendar | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS User Calendar Date Event November 19, 2013 Proposal Review Panel Meetings December 10, 2013 Beamtime Allocation Committee Meeting January 22, 2014 Joint APSUO Steering Committee and Partner User Council Meeting March 7, 2014 Proposal Deadline Run Cycle 2014-2 March 11-13, 2014 Scientific Advisory Committee Meeting May 12-15, 2014 APS/CNM/EMC Users Meeting May 13, 2014 Partner User Council Meeting May 14, 2014 APSUO Steering Committee Meeting July 9, 2014 Joint APSUO Steering Committee and Partner User Council Meeting July 11, 2014 Proposal Deadline Run Cycle 2014-3 September 17, 2014 Joint APSUO Steering Committee and Partner User Council Meeting November 4-6, 2014 Scientific Advisory Committee Meeting March 16-18, 2015 Scientific Advisory Committee Meeting

187

Results of Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A  

Open Energy Info (EERE)

Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Results of Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A Abstract N/A Authors James Kauahikaua and Douglas Klein Published Journal Geothermal Resources Council, TRANSACTIONS, 1978 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Results of Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A Citation James Kauahikaua,Douglas Klein. 1978. Results of Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A. Geothermal Resources Council, TRANSACTIONS. 2:363-366. Retrieved from "http://en.openei.org/w/index.php?title=Results_of_Electric_Survey_in_the_Area_of_Hawaii_Geothermal_Test_Well_HGP-A&oldid=682499

188

Calendar | OpenEI Community  

Open Energy Info (EERE)

Calendar Calendar Home > Community Filter Author Enter a comma separated list of user names. Tags My groups True False Apply Year Month Week Day « Prev 2013 Next » January M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 February M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 March M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 April M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 May M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 June M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 July M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 August M T W T F S S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

189

Development and Testing of a Groundwater Management Model for the Faultless Underground Nuclear Test, Central Nevada Test Area  

DOE Green Energy (OSTI)

This document describes the development and application of a user-friendly and efficient groundwater management model of the Central Nevada Test Area (CNTA) and surrounding areas that will allow the U.S. Department of Energy and state personnel to evaluate the impact of future proposed scenarios. The management model consists of a simple hydrologic model within an interactive groundwater management framework. This framework is based on an object user interface that was developed by the U.S. Geological Survey and has been used by the Desert Research Institute researchers and others to couple disparate environmental resource models, manage the necessary temporal and spatial data, and evaluate model results for management decision making. This framework was modified and applied to the CNTA and surrounding Hot Creek Valley. The utility of the management model was demonstrated through the application of hypothetical future scenarios including mineral mining, regional expansion of agriculture, geothermal energy production, and export of water to large urban areas outside the region. While the results from some of the scenarios indicated potential impacts to the region near CNTA and others did not, together they demonstrate the usefulness of the management tool for managers who need to evaluate the impact proposed changes in groundwater use in or near CNTA may have on radionuclide migration.

Douglas P. Boyle; Gregg Lamorey; Scott Bassett; Greg Pohll; Jenny Chapman

2006-01-25T23:59:59.000Z

190

Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) | Open Energy  

Open Energy Info (EERE)

Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) Exploration Activity Details Location Lake City Hot Springs Area Exploration Technique Flow Test Activity Date Usefulness useful DOE-funding Unknown Notes Core holes enabled injection and flow testing up to 70 gpm. References Dick Benoit, Joe Moore, Colin Goranson, David Blackwell (2005) Core Hole Drilling And Testing At The Lake City, California Geothermal Field Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Lake_City_Hot_Springs_Area_(Benoit_Et_Al.,_2005)&oldid=386872" Category: Exploration Activities What links here Related changes

191

200 Area Treated Effluent Disposal Facility operational test specification. Revision 2  

Science Conference Proceedings (OSTI)

This document identifies the test specification and test requirements for the 200 Area Treated Effluent Disposal Facility (200 Area TEDF) operational testing activities. These operational testing activities, when completed, demonstrate the functional, operational and design requirements of the 200 Area TEDF have been met. The technical requirements for operational testing of the 200 Area TEDF are defined by the test requirements presented in Appendix A. These test requirements demonstrate the following: pump station No.1 and associated support equipment operate both automatically and manually; pump station No. 2 and associated support equipment operate both automatically and manually; water is transported through the collection and transfer lines to the disposal ponds with no detectable leakage; the disposal ponds accept flow from the transfer lines with all support equipment operating as designed; and the control systems operate and status the 200 Area TEDF including monitoring of appropriate generator discharge parameters.

Crane, A.F.

1995-02-09T23:59:59.000Z

192

Flow Test At Black Warrior Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Linked Data Page Edit History Share this page on Facebook icon Twitter icon Flow Test At Black Warrior Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal...

193

Flow Test At Flint Geothermal Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Flint Geothermal Area (DOE GTP) Exploration Activity Details Location Flint...

194

Flow Test At Mcgee Mountain Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Mcgee Mountain Area (DOE GTP) Exploration Activity Details Location Mcgee Mountain...

195

Flow Test At Crump's Hot Springs Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Crump's Hot Springs Area (DOE GTP) Exploration Activity Details Location Crump's Hot...

196

Flow Test At San Emidio Desert Area (DOE GTP) | Open Energy Informatio...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At San Emidio Desert Area (DOE GTP) Exploration Activity Details Location San Emidio...

197

Flow Test At Steamboat Springs Area (Combs, Et Al., 1999) | Open...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Steamboat Springs Area (Combs, Et Al., 1999) Exploration Activity Details Location...

198

Flow Test At Newberry Caldera Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Newberry Caldera Area (DOE GTP) Exploration Activity Details Location Newberry...

199

Flow Test At Soda Lake Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Soda Lake Area (DOE GTP) Exploration Activity Details Location Soda Lake...

200

Calendar of Events | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Calendar of Events beta Calendar of Events beta January 2014 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 [ Previous Events ] RSS iCalendar hcalendar supported Also available in RSS and iCalendar formats. To report an event that is not listed, contact webmaster. Upcoming Jan 13 Monday Engineering the Elasticity of Soft Colloidal Materials Through Surface Modification and Shape Anisotropy Speaker: Lillian C. Hsiao, University of Michigan, Ann Arbor XSD Presentation 401/A1100 @ 11:00 AM View Description Designing complex fluids has always involved the arduous manipulation of system-specific parameters. Recently, we developed a general correlation to predict the flow behavior of a range of soft matter based on their microstructure. By applying the framework of structural rigidity at the

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display...

202

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly....

203

Joint Outreach Task Group (JOTG) Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Group (JOTG) Calendar 2013 November 2013 October 2013 September 2013 August 2013 July 2013 June 2013 May 2013 April 2013 March 2013 February 2013 January 2013 Program Manager: Mary...

204

Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) |  

Open Energy Info (EERE)

Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) Exploration Activity Details Location Fenton Hill Hdr Geothermal Area Exploration Technique Injectivity Test Activity Date Usefulness useful DOE-funding Unknown Notes Fenton Hill HDR site. References Z. V. Dash, H. D. Murphy, R. L. Aamodt, R. G. Aguilar, D. W. Brown, D. A. Counce, H. N. Fisher, C. O. Grigsby, H. Keppler, A. W. Laughlin, R. M. Potter, J. W. Tester, P. E. Trujillo Jr, G. Zyvoloski (1983) Hot Dry Rock Geothermal Reservoir Testing- 1978 To 1980 Retrieved from "http://en.openei.org/w/index.php?title=Injectivity_Test_At_Fenton_Hill_Hdr_Geothermal_Area_(Dash,_Et_Al.,_1983)&oldid=511316"

205

Site Environmental Report-Calendar Year 2001  

Science Conference Proceedings (OSTI)

The Laboratory's mission is to conduct fundamental research in the physical, chemical, materials, mathematical sciences and engineering which underlie energy generating, conversion, transmission and storage technologies, environmental improvement, and other technical areas essential to national needs. These efforts will be maintained so as to contribute to the achievement of the Department of Energy's Missions and Goals; more specifically, to increase the general levels of scientific knowledge and capabilities, to prepare engineering and physical sciences students for future scientific endeavors, and to initiate nascent technologies and practical applications arising from our basic scientific programs. The Laboratory will approach all its operations with the safety and health of all workers as a constant objective and with genuine concern for the environment. Ames Laboratory does not conduct classified research. The primary purpose of this report is to summarize the performance of Ames Laboratory's environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2001. This report is a working requirement of Department of Energy Order 231.1, Environment, Safety, and Health Reporting''.

Dan Kayser

2002-09-03T23:59:59.000Z

206

EA-1050: Test Area North Pool Stabilization Project, Idaho Falls, Idaho |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: Test Area North Pool Stabilization Project, Idaho Falls, 50: Test Area North Pool Stabilization Project, Idaho Falls, Idaho EA-1050: Test Area North Pool Stabilization Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of the U.S. Department of Energy's Idaho National Engineering Laboratory's proposal to remove 344 canisters of Three Mile Island core debris and commercial fuels from the Test Area North Pool and transfer them to the Idaho Chemical Processing Plant for interim dry storage until an alternate storage location other than INEL, or a permanent federal spent nuclear fuel repository is available. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD May 6, 1996 EA-1050: Finding of No Significant Impact Test Area North Pool Stabilization Project

207

Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983)  

Open Energy Info (EERE)

Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Exploration Activity Details Location Fenton Hill Hdr Geothermal Area Exploration Technique Injectivity Test Activity Date Usefulness not indicated DOE-funding Unknown References C. O. Grigsby, J. W. Tester, P. E. Trujillo, D. A. Counce, J. Abbott, C. E. Holley, L. A. Blatz (1983) Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field Investigations Of In Situ Geochemical Behavior Retrieved from "http://en.openei.org/w/index.php?title=Injectivity_Test_At_Fenton_Hill_Hdr_Geothermal_Area_(Grigsby,_Et_Al.,_1983)&oldid=511318

208

ECOLOGICAL MONITORING AND COMPLIANCE PROGRAM CALENDAR YEAR 2005 REPORT  

Science Conference Proceedings (OSTI)

The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the programs activities conducted by Bechtel Nevada (BN) during the Calendar Year 2005. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive and protected/regulated species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Non-Proliferation Test and Evaluation Complex (NPTEC).

BECHTEL NEVADA ECOLOGICAL SERVICES

2006-03-01T23:59:59.000Z

209

Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) | Open Energy  

Open Energy Info (EERE)

Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) Exploration Activity Details Location Lightning Dock Area Exploration Technique Flow Test Activity Date Usefulness useful DOE-funding Unknown Notes After the Welaco temperature survey was completed for TG52-7, preparations were completed for a controlled airlift test. This test was completed in the period from 19-20 September 2003 for some 23 hours. The well produced steady state flow of about 320-325 gpm at a wellhead temperature of 126.7degrees C (260degreesF). This production rate is equivalent to about 162,000 pounds per hour, with the production temperature producing usable

210

Flow Test At Raft River Geothermal Area (2004) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (2004) Flow Test At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2004) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 2004 Usefulness useful DOE-funding GRED II Notes Geothermal Resource Exploration and Definition Projects Raft River (GRED II): Re-assessment and testing of previously abandoned production wells. The objective of the U.S. Geothermal effort is to re-access the available wellbores, assess their condition, perform extensive testing of the reservoir to determine its productive capacity, and perform a resource utilization assessment. At the time of this paper, all five wells had been

211

Flow Test At Coso Geothermal Area (1985-1986) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Coso Geothermal Area (1985-1986) Flow Test At Coso Geothermal Area (1985-1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Coso Geothermal Area (1985-1986) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Flow Test Activity Date 1985 - 1986 Usefulness not indicated DOE-funding Unknown Exploration Basis Understand the connectivity of the production and injection wells. Notes A long-term flow test was conducted involving one producing well (well 43-7), one injector (well 88-1), and two observation wells (well 66-6 and California Energy Co's well 71A-7). The flow test included a well production metering system and a water injection metering system. References Sanyal, S.; Menzies, A.; Granados, E.; Sugine, S.; Gentner, R.

212

Flow Test At Raft River Geothermal Area (2006) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (2006) Flow Test At Raft River Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2006) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 2006 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine field hydraulic conductivity using borehole impeller flowmeter data Notes A quantitative evaluation of borehole-impeller flowmeter data leads to estimated field hydraulic conductivity. Data were obtained during an injection test of a geothermal well at the Raft River geothermal test site in Idaho. Both stationary and trolling calibrations of the flowmeter were made in the well. Methods were developed to adjust for variations in hole

213

F/H Area ETF effluent (H-016 outfall), ceriodaphnia survival/reproduction test, test date: March 21, 1991  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the F/H area at Savannah River Plant affects the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher`s Exact Test and the Trimmed Spearman-Karber test to determine the effluent concentration necessary to cause statistically significant (p = 0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

214

F/H Area ETF effluent (H-016 outfall), ceriodaphnia survival/reproduction test, test date: March 21, 1991  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the F/H area at Savannah River Plant affects the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher's Exact Test and the Trimmed Spearman-Karber test to determine the effluent concentration necessary to cause statistically significant (p = 0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

215

Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power  

SciTech Connect

This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

Rutherford, P.D. [ed.] [ed.

1999-09-22T23:59:59.000Z

216

Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne  

Science Conference Proceedings (OSTI)

OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

None

2000-09-01T23:59:59.000Z

217

Beam Test of a Large Area nonn Silicon Strip Detector with Fast Binary Readout Electronics  

E-Print Network (OSTI)

Beam Test of a Large Area n­on­n Silicon Strip Detector with Fast Binary Readout Electronics Y test was carried out for the non­irradiated and the irradiated detector modules. Efficiency, noise occupancy and performance in the edge regions were analyzed using the beam test data. High efficiency

218

Beam Test of a Large Area nonn Silicon Strip Detector with Fast Binary Readout Electronics  

E-Print Network (OSTI)

Beam Test of a Large Area n­on­n Silicon Strip Detector with Fast Binary Readout Electronics Y modules was irradiated with protons to a fluence of 1.2 ? 10 14 p/cm 2 . A beam test was carried out in the edge regions were analyzed using the beam test data. High efficiency both for the non

219

Flow Test At Chena Area (Benoit, Et Al., 2007) | Open Energy Information  

Open Energy Info (EERE)

Chena Area (Benoit, Et Al., 2007) Chena Area (Benoit, Et Al., 2007) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Chena Area (Benoit, Et Al., 2007) Exploration Activity Details Location Chena Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References Dick Benoit, Gwen Holdmann, David Blackwell (2007) Low Cost Exploration, Testing, And Development Of The Chena Geothermal Resource Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Chena_Area_(Benoit,_Et_Al.,_2007)&oldid=387083" Category: Exploration Activities What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services OpenEI partners with a broad range of international organizations to grow

220

Update on EH-23 activities in Calendar Year 1993  

SciTech Connect

This report briefly describes the activities undertaken by the US DOE`s Office of Environmental Guidance (EH-23) of the Office of the Deputy Assistant Secretary for Environment (EH-20) in Calendar Year (CY) 1993 in seven major areas: (1) regulatory review and analysis; (2) environmental policy and guidance; (3) environmental training courses and workshops; (4) workgroups and committees; (5) environmental regulatory management support; (6) special projects and other activities; and (7) special presentations. A list of selected environmental guidance memoranda and documents distributed by EH-23 in CY 1993 is also included.

Not Available

1994-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

F/H Area ETF effluent (H-016 outfall) ceriodaphnia survival/reproduction test, test date: December 28, 1989  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the H/F area of Savannah River Plant affect the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher`s Exact Test and Probit Analysis to determine the effluent concentration necessary to cause statistically significant (p=0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

222

F/H Area ETF effluent (H-016 outfall) ceriodaphnia survival/reproduction test, test date: December 28, 1989  

SciTech Connect

This toxicity test was conducted to determine if the effluent from the H/F area of Savannah River Plant affect the survival or reproduction of the test organisms during a seven day period. The test involved exposing the test organisms to a series of dilutions of the effluent. At each dilution the survival and reproduction of ten test organisms was recorded. Each effluent dilution was compared to a control set of test organisms. Survival data were analyzed by Fisher's Exact Test and Probit Analysis to determine the effluent concentration necessary to cause statistically significant (p=0.05) mortality. Reproduction data was analyzed for normality, homogeneity of variance and equality of replicates among dilutions to determine the appropriate statistical test for analysis of statistical differences in reproduction among dilutions. Results are summarized.

Specht, W.L.

1991-08-01T23:59:59.000Z

223

Construction of MV-6 Well Pad at the Central Nevada Test Area Completed |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction of MV-6 Well Pad at the Central Nevada Test Area Construction of MV-6 Well Pad at the Central Nevada Test Area Completed Construction of MV-6 Well Pad at the Central Nevada Test Area Completed October 22, 2013 - 6:10pm Addthis What does this project do? Goal 1. Protect human health and the environment A new groundwater monitoring/validation (MV) well was installed at the Central Nevada Test Area (CNTA) in September 2013. LM proposed this well to the Nevada Division of Environmental Protection (NDEP) to enhance the existing monitoring network and to expedite the Federal Facility Agreement and Consent Order (FFACO) closure process for the CNTA Subsurface Corrective Action Unit. CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to U.S. Highway 6, about 30 miles north of Warm Springs, Nevada. CNTA was the site of "Project Faultless," a test site where a

224

Construction of MV-6 Well Pad at the Central Nevada Test Area Completed |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction of MV-6 Well Pad at the Central Nevada Test Area Construction of MV-6 Well Pad at the Central Nevada Test Area Completed Construction of MV-6 Well Pad at the Central Nevada Test Area Completed October 22, 2013 - 6:10pm Addthis What does this project do? Goal 1. Protect human health and the environment A new groundwater monitoring/validation (MV) well was installed at the Central Nevada Test Area (CNTA) in September 2013. LM proposed this well to the Nevada Division of Environmental Protection (NDEP) to enhance the existing monitoring network and to expedite the Federal Facility Agreement and Consent Order (FFACO) closure process for the CNTA Subsurface Corrective Action Unit. CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to U.S. Highway 6, about 30 miles north of Warm Springs, Nevada. CNTA was the site of "Project Faultless," a test site where a

225

Flow Test At Raft River Geothermal Area (1979) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (1979) Flow Test At Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 1979 Usefulness useful DOE-funding Unknown Exploration Basis To allow for the lateral and vertical extrapolation of core and test data and bridged the gap between surface geophysical data and core analyses. Notes Temperature and flowmeter logs provide evidence that these fractures and faults are conduits that conduct hot water to the wells. One of the intermediate depth core holes penetrated a hydrothermally altered zone that includes several fractures producing hot water. This altered production

226

Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup which occurred after test activities.

NONE

1997-05-14T23:59:59.000Z

227

ENVIRONMENTAL IlONITORING REPORT FOR THE NEVADA TEST SITE AND OTHER TEST AREAS USED FOR UNDERGROUND NUCLEAR DETONATIONS  

Office of Legacy Management (LM)

IlONITORING REPORT FOR THE NEVADA TEST SITE IlONITORING REPORT FOR THE NEVADA TEST SITE AND OTHER TEST AREAS USED FOR UNDERGROUND NUCLEAR DETONATIONS January through December 1975 Nonitoring Operations Division Environmental Monitoring and Support Laboratory U.S. ENVIRONMENTAL PROTECTION AGENCY Las Vegas, Nevada 89114 APRIL 1976 This work performed under a Memorandum of Understanding No. AT(26-1)-539 for the U . S . ENERGY RESEARCH & DEVELOPMENT ADMINISTRATION EMSL-LV-5 39-4 May 1976 ENVIRONMENTAL 14ONITORING REPORT FOR THE NEVADA TEST SITE AND OTHER TEST AREAS USED FOR UNDERGROUND NUCLEAR DETONATIONS January through December I975 Monitoring Operations Division Environmental Monitoring and Support Laboratory U.S. ENVIRONMENTAL PROTECTION AGENCY Las Vegas, Nevada 89114 APRIL 1976 This work performed under a Memorandum of

228

Closure Report for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 425 is located on the Tonopah Test Range, approximately 386 kilometers (240 miles) northwest of Las Vegas, Nevada. CAU 425 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and is comprised of one Corrective Action Site (CAS). CAS 09-08-001-TA09 consisted of a large pile of concrete rubble from the original Hard Target and construction debris associated with the Tornado Rocket Sled Tests. CAU 425 was closed in accordance with the FFACO and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada (U.S. Department of Energy, Nevada Operations Office, 2002). CAU 425 was closed by implementing the following corrective actions: The approved corrective action for this unit was clean closure. Closure activities included: (1) Removal of all the debris from the site. (2) Weighing each load of debris leaving the job site. (3) Transporting the debris to the U.S. Air Force Construction Landfill for disposal. (4) Placing the radioactive material in a U.S. Department of Transportation approved container for proper transport and disposal. (5) Transporting the radioactive material to the Nevada Test Site for disposal. (6) Regrading the job site to its approximate original contours/elevation.

K. B. Campbell

2003-03-01T23:59:59.000Z

229

Characterization Report for the 92-Acre Area of the Area 5 Radioactive Waste Management Site, Nevada Test Site, Nevada  

SciTech Connect

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office manages two low-level Radioactive Waste Management Sites at the Nevada Test Site. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. This report summarizes characterization and monitoring work pertinent to the 92-Acre Area in the southeast part of the Area 5 Radioactive Waste Management Sites. The decades of characterization and assessment work at the Area 5 RWMS indicate that the access controls, waste operation practices, site design, final cover design, site setting, and arid natural environment contribute to a containment system that meets regulatory requirements and performance objectives for the short- and long-term protection of the environment and public. The available characterization and Performance Assessment information is adequate to support design of the final cover and development of closure plans. No further characterization is warranted to demonstrate regulatory compliance. U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is proceeding with the development of closure plans for the six closure units of the 92-Acre Area.

Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2006-06-01T23:59:59.000Z

230

Aerial Photography At Nevada Test And Training Range Area (Sabin, Et Al.,  

Open Energy Info (EERE)

2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aerial Photography At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Aerial Photography Activity Date Usefulness not indicated DOE-funding Unknown Notes We re-examined most of the area using newer orthophotography, SPOT, and Thematic Mapper images, and identified several areas of possible late Quaternary surface faulting (Figure 3). References A. E. Sabin, J. D. Walker, J. Unruh, F. C. Monastero (2004) Toward The Development Of Occurrence Models For Geothermal Resources In The Western United States Retrieved from "http://en.openei.org/w/index.php?title=Aerial_Photography_At_Nevada_Test_And_Training_Range_Area_(Sabin,_Et_Al.,_2004)&oldid=386843

231

Flow Test At Pilgrim Hot Springs Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Area (DOE GTP) Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Pilgrim Hot Springs Area (DOE GTP) Exploration Activity Details Location Pilgrim Hot Springs Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Pilgrim_Hot_Springs_Area_(DOE_GTP)&oldid=402456" Categories: Exploration Activities DOE Funded Activities ARRA Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863028959 Varnish cache server

232

Events Calendar | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Events Calendar Events Calendar University Physics Events Upcoming Events Events Calendar Type of Event - Any - Colloquia Conference Geophysical Fluid Dynamics Laboratory Open House Princeton University Research Seminar Science Education Science On Saturday Apply COLLOQUIUM: "The Usefulness of Useless Knowledge": The History of the Institute for Advanced Study, Christine Di Bella, Institute for Advanced Study Wednesday, January 29, 2014 - 16:00 to 18:30 COLLOQUIUM: Addressing Big Data Challenges in Simulation-based Science, Professor Manish Prashar, Rutgers University Wednesday, January 22, 2014 - 16:00 to 17:30 COLLOQUIUM: The Global Carbon Cycle and Earth's Climate, Professor David Archer, University of Chicago Wednesday, January 15, 2014 - 16:00 to 17:30 COLLOQUIUM: On Tracing the Origins of the Solar Wind, Dr. Sarah McGregor,

233

LEDS Events Calendar | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » LEDS Events Calendar Jump to: navigation, search Home | About | Inventory | Partnerships | Capacity Building | Webinars | Reports | Events | News | List Serve LEDS Events Calendar January 2014 Today January February March April May June July August September October November December 2014 Go to month Sunday Monday Tuesday Wednesday Thursday Friday Saturday 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 Add an Event Upcoming LEDS Events Retrieved from "http://en.openei.org/w/index.php?title=LEDS_Events_Calendar&oldid=384765" What links here Related changes

234

Geodetic Survey At Nevada Test And Training Range Area (Sabin, Et Al.,  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geodetic Survey At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Geodetic Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes NAFR straddles the boundary of the Walker Lane belt and the Basin and Range extensional province. Neotectonic motions are inferred from GPS and seismic observations. GPS velocities indicate that the strain field changes from the east-west extension typical of the Basin and Range to the northwest-southeast-directed transtension characteristic of the Walker Lane belt across the region.

235

Injectivity Test At Newberry Caldera Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Newberry Caldera Area (Combs, Et Al., 1999) Newberry Caldera Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Newberry Caldera Area (Combs, Et Al., 1999) Exploration Activity Details Location Newberry Caldera Area Exploration Technique Injectivity Test Activity Date Usefulness useful DOE-funding Unknown Notes After circulating the mud out of the hole and replacing it with clear water, we attempted two injection tests; one into the open hole section (51 16'- 5360') below the HQ liner, and one into the annulus outside the uncemented part (2748' - -4800') of the liner. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr., Ronald D. Jacobsen, Gene Polik (1999) Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration

236

Flow Test At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) |  

Open Energy Info (EERE)

Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Exploration Activity Details Location Lassen Volcanic National Park Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown Notes Water samples were collected during nitrogen-stimulated flow tests in 1978, but no information was provided on sampling conditions. The well was flowed again for the last time in 1982, but the flow test lasted only 1 h (Thompson, 1985). References Cathy J. Janik, Marcia K. McLaren (2010) Seismicity And Fluid Geochemistry At Lassen Volcanic National Park, California- Evidence For Two

237

Results of Electric Survey in the Area of Hawaii Geothermal Test...  

Open Energy Info (EERE)

1978 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Results of Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A...

238

Aquifer Testing Recommendations for Supporting Phase II of the T Area Technetium-99 Data Objectives Process  

Science Conference Proceedings (OSTI)

Aquifer characterization needs are currently being assessed to optimize pump-and-treat remedial strategies within the 200-ZP-1 operable unit, specifically for the immediate area of the 241-T Tank Farm. This report provides a general discussion of the six identified hydrologic test methods for possible subsequent characterization within the 241-T Tank Farm area and details for implementing the large-scale recovery test after terminating pumping at the 241-Tank Farm extraction well locations.

Spane, Frank A.

2008-04-02T23:59:59.000Z

239

Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report  

SciTech Connect

This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures.

McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

1984-01-01T23:59:59.000Z

240

Hanford Site Environmental Report for Calendar Year 2001  

SciTech Connect

This report summarizes environmental information for the Hanford Site in Washington State for the calendar year 2001.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2002-09-02T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada  

SciTech Connect

This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

Bechtel Nevada

1998-08-31T23:59:59.000Z

242

Closure report for CAU 339: Area 12 Fleet Operations steam-cleaning discharge area, Nevada Test Site  

SciTech Connect

This Closure Report (CR) provides documentation of the completed corrective action at the Area 12 Fleet Operations site located in the southeast portion of the Area 12 Camp at the Nevada Test Site (NTS). Field work was performed in July 1997 as outlined in the Corrective Action Plan (CAP). The CAP was approved by the Nevada Division of Environmental Protection (NDEP) in June 1997. This site is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Site (CAS) Number 12-19-01 and is the only CAS in Corrective Action Unit (CAU) 339. The former Area 12 Fleet Operations Building 12-16 functioned as a maintenance facility for light- and heavy-duty vehicles from approximately 1965 to January 1993. Services performed at the site included steam-cleaning, tire service, and preventative maintenance on vehicles and equipment. Past activities impacted the former steam-cleaning discharge area with volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil.

NONE

1997-12-01T23:59:59.000Z

243

Private Water Well Testing in Areas Impacted by Marcellus Shale Gas Drilling  

E-Print Network (OSTI)

Private Water Well Testing in Areas Impacted by Marcellus Shale Gas Drilling (Updated November 15th in the absence of shale-gas drilling, well owners are strongly encouraged to evaluate their water on a regular testing in order to more specifically document potential impacts of Marcellus Shale gas development

Manning, Sturt

244

Thermal single-well injection-withdrawal tracer tests for determining fracture-matrix heat transfer area  

E-Print Network (OSTI)

Testing for Estimating Heat Transfer Area in FracturedFRACTURE-MATRIX HEAT TRANSFER AREA Karsten Pruess andimprove the flow and heat transfer characteristics of the

Pruess, K.

2011-01-01T23:59:59.000Z

245

Injectivity Test At Steamboat Springs Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Steamboat Springs Area (Combs, Et Steamboat Springs Area (Combs, Et Al., 1999) Exploration Activity Details Location Steamboat Springs Area Exploration Technique Injectivity Test Activity Date Usefulness not indicated DOE-funding Unknown Notes Part of the injection testing used downhole packers for isolating various zones and evaluating their permeability. By running the packers into the hole on N-rod ( 2.75"+K610 OD), the annulus was roughly the same cross-sectional area as the inside of the pipe. It was then possible to inject into either the zone above the packer or the one below, and compare the infectivity of those intervals. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr., Ronald D. Jacobsen, Gene Polik (1999) Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration

246

Radiation shielding calculations for MuCool test area at Fermilab  

DOE Green Energy (OSTI)

The MuCool Test Area (MTA) is an intense primary beam facility derived directly from the Fermilab Linac to test heat deposition and other technical concerns associated with the liquid hydrogen targets being developed for cooling intense muon beams. In this shielding study the results of Monte Carlo radiation shielding calculations performed using the MARS14 code for the MuCool Test Area and including the downstream portion of the target hall and berm around it, access pit, service building, and parking lot are presented and discussed within the context of the proposed MTA experimental configuration.

Igor Rakhno; Carol Johnstone

2004-05-26T23:59:59.000Z

247

Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

K. B. Campbell

2002-04-01T23:59:59.000Z

248

Injectivity Test At Reese River Area (Henkle & Ronne, 2008) | Open Energy  

Open Energy Info (EERE)

Reese River Area (Henkle & Ronne, Reese River Area (Henkle & Ronne, 2008) Exploration Activity Details Location Reese River Area Exploration Technique Injectivity Test Activity Date Usefulness not indicated DOE-funding Unknown Notes On March 22, 2007 a brief injectivity test was preformed after the slotted liner had been installed. Water was injected at flow rates of 6.3 l/s, 13 l/s and 19 l/s and the pressure and temperature was recorded down hole at a depth of 926 m. At the higher flow rate, the test was interrupted several times to repair leaks at the surface. From the recorded pressure an approximate injectivity index of 10 l/s/MPa was calculated. References William R. Henkle, Joel Ronne (2008) Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling And Testing Retrieved from

249

Flow Test At Long Valley Caldera Area (Farrar, Et Al., 2003) | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Flow Test At Long Valley Caldera Area (Farrar, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Long Valley Caldera Area (Farrar, Et Al., 2003) Exploration Activity Details Location Long Valley Caldera Area Exploration Technique Flow Test Activity Date Usefulness useful DOE-funding Unknown Notes The pressure data collected during a 50-h-long flow test at LVEW in September 2001 are best matched using solutions for a flow system consisting of a steeply dipping fracture with infinite hydraulic conductivity, surrounded by a finite-conductivity rock matrix. At shallow

250

Injectivity Test At Vale Hot Springs Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Vale Hot Springs Area (Combs, Et Vale Hot Springs Area (Combs, Et Al., 1999) Exploration Activity Details Location Vale Hot Springs Area Exploration Technique Injectivity Test Activity Date Usefulness useful DOE-funding Unknown Notes Analysis of the two injection tests performed at the exploration slimhole site during May, 1995 yielded estimates for the permeability-thickness product (transmissivity) kh of 0.25 and 0.23 Da-fi, based on pressure fall off after injection (see Section IV-a). Using the pressure buildup for the second test, a transmissivity of 0.610 Da-ft was estimated. These estimates are approximately an order of magnitude smaller than the kh values estimated for the nearby A-Alt well which was tested in 1994. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr.,

251

Flow Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) | Open  

Open Energy Info (EERE)

Grigsby, Et Al., 1983) Grigsby, Et Al., 1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Exploration Activity Details Location Fenton Hill Hdr Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References C. O. Grigsby, J. W. Tester, P. E. Trujillo, D. A. Counce, J. Abbott, C. E. Holley, L. A. Blatz (1983) Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field Investigations Of In Situ Geochemical Behavior Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Fenton_Hill_Hdr_Geothermal_Area_(Grigsby,_Et_Al.,_1983)&oldid=511312" Category: Exploration Activities What links here Related changes

252

Modeling-Computer Simulations At Nevada Test And Training Range Area  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Modeling-Computer Simulations At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Modeling-Computer Simulations Activity Date Usefulness not indicated DOE-funding Unknown Notes Nellis Air Force Range (NAFR) occupies over 3 million acres in southern Nevada (Figure 1). We recently assessed potential utility-grade geothermal

253

Flow Test At Lake City Hot Springs Area (Warpinski, Et Al., 2004) | Open  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Flow Test At Lake City Hot Springs Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lake City Hot Springs Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Lake City Hot Springs Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown Notes The Lake City site, which is located in far northeastern California, consists of a previously identified geothermal site that has been explored with both geophysics and drilling (Hedel, 1981), but has not been

254

Plutonium-aerosol emission rates and potential inhalation exposure during cleanup and treatment test at Area 11, Nevada Test Site  

SciTech Connect

A Cleanup and Treatment (CAT) test was conducted in 1981 at Area 11, Nevada Test Site. Its purpose was to evaluate the effectiveness of using a large truck-mounted vacuum cleaner similar to those used to clean paved streets for cleaning radiological contamination from the surface of desert soils. We found that four passes with the vehicle removed 97% of the alpha contamination and reduced resuspension by 99.3 to 99.7%. Potential exposure to cleanup workers was slight when compared to natural background exposure. 7 refs., 1 fig., 2 tabs.

Shinn, J.H.; Homan, D.N.

1985-08-13T23:59:59.000Z

255

Underground Test Area Subproject Phase I Data Analysis Task. Volume VII - Tritium Transport Model Documentation Package  

SciTech Connect

Volume VII of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the tritium transport model documentation. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.

None

1996-12-01T23:59:59.000Z

256

Underground Test Area Subproject Phase I Data Analysis Task. Volume IV - Hydrologic Parameter Data Documentation Package  

Science Conference Proceedings (OSTI)

Volume IV of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the hydrologic parameter data. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.

None

1996-09-01T23:59:59.000Z

257

Underground Test Area Subproject Phase I Data Analysis Task. Volume VIII - Risk Assessment Documentation Package  

Science Conference Proceedings (OSTI)

Volume VIII of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the risk assessment documentation. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.

None

1996-12-01T23:59:59.000Z

258

Compilation of modal analyses of volcanic rocks from the Nevada Test Site area, Nye County, Nevada  

SciTech Connect

Volcanic rock samples collected from the Nevada Test Site, Nye County, Nevada, between 1960 and 1985 were analyzed by thin section to obtain petrographic mode data. In order to provide rapid accessibility to the entire database, all data from the cards were entered into a computerized database. This computer format will enable workers involved in stratigraphic studies in the Nevada Test Site area and other locations in southern Nevada to perform independent analyses of the data. The data were compiled from the mode cards into two separate computer files. The first file consists of data collected from core samples taken from drill holes in the Yucca Mountain area. The second group of samples were collected from measured sections and surface mapping traverses in the Nevada Test Site area. Each data file is composed of computer printouts of tables with mode data from thin section point counts, comments on additional data, and location data. Tremendous care was taken in transferring the data from the cards to computer, in order to preserve the original information and interpretations provided by the analyzer. In addition to the data files above, a file is included that consists of Nevada Test Site petrographic data published in other US Geological Survey and Los Alamos National Laboratory reports. These data are presented to supply the user with an essentially complete modal database of samples from the volcanic stratigraphic section in the Nevada Test Site area. 18 refs., 4 figs.

Page, W.R.

1990-10-01T23:59:59.000Z

259

Use of the WECC WAMS in Wide Area Probing Tests for Validation of System Performance & Modeling  

Science Conference Proceedings (OSTI)

During 2005 and 2006 the Western Electricity Coordinating Council (WECC) performed three major tests of western system dynamics. These tests used a Wide Area Measurement System (WAMS) based primarily on Phasor Measurement Units (PMUs) to determine response to events including the insertion of the 1400-MW Chief Joseph braking resistor, probing signals, and ambient events. Test security was reinforced through real-time analysis of wide area effects, and high-quality data provided dynamic profiles for interarea modes across the entire western interconnection. The tests established that low-level optimized pseudo-random 20-MW probing with the Pacific DC Intertie (PDCI) roughly doubles the apparent noise that is natural to the power system, providing sharp dynamic information with negligible interference to system operations. Such probing is an effective alternative to use of the 1400-MW Chief Joseph dynamic brake, and it is under consideration as a standard means for assessing dynamic security.

Hauer, John F.; Mittelstadt, William; Martin, Kenneth E.; Burns, J. W.; Lee, Harry; Pierre, John W.; Trudnowski, Daniel

2009-02-01T23:59:59.000Z

260

Radiation shielding issues for MuCool test area at Fermilab  

DOE Green Energy (OSTI)

The MuCool Test Area (MTA) is an intense primary beam facility derived directly from the Fermilab Linac to test heat deposition and other technical concerns associated with the liquid hydrogen targets being developed for cooling intense muon beams. In this study the origin of the outgoing collimated neutron beam is examined. An alternative shielding option for MTA is investigated as well as the hypothetical worst case of experimental setup is considered.

Rakhno, I.; Johnstone, C.; /Fermilab

2005-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Calendar and PHEV Cycle Life Aging of High-Energy, Lithium-Ion Cells Containing Blended Spinel and Layered-Oxide Cathodes  

DOE Green Energy (OSTI)

One hundred seven commercially available, off-the-shelf, 1.2-Ah cells were tested for calendar life and CS cycle- and CD cycle-life using the new USABC PHEV Battery Test Manual. Here, the effects of temperature on calendar life, on CS cycle life, and on CD cycle life; the effects of SOC on calendar life and on CS cycle life; and the effects of rest time on CD cycle life were investigated. The results indicated that the test procedures caused performance decline in the cells in an expected manner, calendar < CS cycling < CD cycling. In some cases, the kinetic law changed with test type, from linear-with-time to about t2. Additionally, temperature was found to stress the cells more than SOC, causing increased changes in performance with increasing temperature.

Jeffrey R. Belt; I. Bloom

2011-12-01T23:59:59.000Z

262

Calendar and PHEV Cycle Life Aging of High-Energy, Lithium-Ion Cells Containing Blended Spinel and Layered Oxide Cathodes  

DOE Green Energy (OSTI)

One hundred seven commercially available, off-the-shelf, 1.2-Ah cells were tested for calendar life and CS cycle- and CD cycle-life using the new USABC PHEV Battery Test Manual. Here, the effects of temperature on calendar life, on CS cycle life, and on CD cycle life; the effects of SOC on calendar life and on CS cycle life; and the effects of rest time on CD cycle life were investigated. The results indicated that the test procedures caused performance decline in the cells in an expected manner, calendar < CS cycling < CD cycling. In some cases, the kinetic law changed with test type, from linear-with-time to about t2. Additionally, temperature was found to stress the cells more than SOC, causing increased changes in performance with increasing temperature.

J. Belt

2011-12-01T23:59:59.000Z

263

Regional groundwater flow and tritium transport modeling and risk assessment of the underground test area, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The groundwater flow system of the Nevada Test Site and surrounding region was evaluated to estimate the highest potential current and near-term risk to the public and the environment from groundwater contamination downgradient of the underground nuclear testing areas. The highest, or greatest, potential risk is estimated by assuming that several unusually rapid transport pathways as well as public and environmental exposures all occur simultaneously. These conservative assumptions may cause risks to be significantly overestimated. However, such a deliberate, conservative approach ensures that public health and environmental risks are not underestimated and allows prioritization of future work to minimize potential risks. Historical underground nuclear testing activities, particularly detonations near or below the water table, have contaminated groundwater near testing locations with radioactive and nonradioactive constituents. Tritium was selected as the contaminant of primary concern for this phase of the project because it is abundant, highly mobile, and represents the most significant contributor to the potential radiation dose to humans for the short term. It was also assumed that the predicted risk to human health and the environment from tritium exposure would reasonably represent the risk from other, less mobile radionuclides within the same time frame. Other contaminants will be investigated at a later date. Existing and newly collected hydrogeologic data were compiled for a large area of southern Nevada and California, encompassing the Nevada Test Site regional groundwater flow system. These data were used to develop numerical groundwater flow and tritium transport models for use in the prediction of tritium concentrations at hypothetical human and ecological receptor locations for a 200-year time frame. A numerical, steady-state regional groundwater flow model was developed to serve as the basis for the prediction of the movement of tritium from the underground testing areas on a regional scale. The groundwater flow model was used in conjunction with a particle-tracking code to define the pathlines followed by groundwater particles originating from 415 points associated with 253 nuclear test locations. Three of the most rapid pathlines were selected for transport simulations. These pathlines are associated with three nuclear test locations, each representing one of the three largest testing areas. These testing locations are: BOURBON on Yucca Flat, HOUSTON on Central Pahute Mesa, and TYBO on Western Pahute Mesa. One-dimensional stochastic tritium transport simulations were performed for the three pathlines using the Monte Carlo method with Latin hypercube sampling. For the BOURBON and TYBO pathlines, sources of tritium from other tests located along the same pathline were included in the simulations. Sensitivity analyses were also performed on the transport model to evaluate the uncertainties associated with the geologic model, the rates of groundwater flow, the tritium source, and the transport parameters. Tritium concentration predictions were found to be mostly sensitive to the regional geology in controlling the horizontal and vertical position of transport pathways. The simulated concentrations are also sensitive to matrix diffusion, an important mechanism governing the migration of tritium in fractured carbonate and volcanic rocks. Source term concentration uncertainty is most important near the test locations and decreases in importance as the travel distance increases. The uncertainty on groundwater flow rates is as important as that on matrix diffusion at downgradient locations. The risk assessment was performed to provide conservative and bounding estimates of the potential risks to human health and the environment from tritium in groundwater. Risk models were designed by coupling scenario-specific tritium intake with tritium dose models and cancer and genetic risk estimates using the Monte Carlo method. Estimated radiation doses received by individuals from chronic exposure to tritium, and the corre

None

1997-10-01T23:59:59.000Z

264

Closure report for housekeeping category, Corrective Action Unit 349, Area 12, Nevada Test Site  

Science Conference Proceedings (OSTI)

This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 349 Area 12 at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

NONE

1998-01-01T23:59:59.000Z

265

Corrective Action Decision Document for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada Appendix D - Corrective Action Investigation Report, Central Nevada Test Area, CAU 417  

SciTech Connect

This Corrective Action Decision Document (CADD) identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 417: Central Nevada Test Area Surface, Nevada, under the Federal Facility Agreement and Consent Order. Located in Hot Creek Valley in Nye County, Nevada, and consisting of three separate land withdrawal areas (UC-1, UC-3, and UC-4), CAU 417 is comprised of 34 corrective action sites (CASs) including 2 underground storage tanks, 5 septic systems, 8 shaker pad/cuttings disposal areas, 1 decontamination facility pit, 1 burn area, 1 scrap/trash dump, 1 outlier area, 8 housekeeping sites, and 16 mud pits. Four field events were conducted between September 1996 and June 1998 to complete a corrective action investigation indicating that the only contaminant of concern was total petroleum hydrocarbon (TPH) which was found in 18 of the CASs. A total of 1,028 samples were analyzed. During this investigation, a statistical approach was used to determine which depth intervals or layers inside individual mud pits and shaker pad areas were above the State action levels for the TPH. Other related field sampling activities (i.e., expedited site characterization methods, surface geophysical surveys, direct-push geophysical surveys, direct-push soil sampling, and rotosonic drilling located septic leachfields) were conducted in this four-phase investigation; however, no further contaminants of concern (COCs) were identified. During and after the investigation activities, several of the sites which had surface debris but no COCs were cleaned up as housekeeping sites, two septic tanks were closed in place, and two underground storage tanks were removed. The focus of this CADD was to identify CAAs which would promote the prevention or mitigation of human exposure to surface and subsurface soils with contaminant concentrations above preliminary action levels. Based on the potential exposure pathways, several risk-based CAAs were developed and evaluated against the individual CAS requirements. It was determined that a combination of the CAAs would be recommended to meet all applicable state and federal regulations for closure of these sites and to eliminate potential future exposure pathways to the TPH-contaminated soils.

U.S. Department of Energy, Nevada Operations office

1999-04-02T23:59:59.000Z

266

Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that the landfill cells were used for solid waste disposal, including disposal of UXO.

Bechtel Nevada

1998-09-30T23:59:59.000Z

267

Closure Report for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada  

SciTech Connect

This closure report (CR) provides documentation for the closure of the Roller Coaster RADSAFE Area (RCRSA) Corrective Action Unit (CAU) 407 identified in the Federal Facility Agreement and Consent Order (FFACO) (Nevada Division of Environmental Protection [NDEP] et al., 1996). CAU 407 is located at the Tonopah Test Range (TTR), Nevada. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The RCRSA is located on the northeast comer of the intersection of Main Road and Browne's Lake Road, which is approximately 8 km (5 mi) south of Area 3 (Figure 1). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Double Tracks and Clean Slate tests. Investigation of the RCRSA was conducted from June through November of 1998. A Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOEN], 1999) was approved in October of 1999. The purpose of this CR is to: Document the closure activities as proposed in the Corrective Action Plan (CAP) (DOEM, 2000). Obtain a Notice of Completion from the NDEP. Recommend the movement of CAU 407 from Appendix III to Appendix IV of the FFACO. The following is the scope of the closure actions implemented for CAU 407: Removal and disposal of surface soils which were over three times background for the area. Soils identified for removal were disposed of at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS). Excavated areas were backfilled with clean borrow soil located near the site. A soil cover was constructed over the waste disposal pit area, where subsurface constituents of concern remain. The site was fenced and posted as an ''Underground Radioactive Material'' area.

T. M. Fitzmaurice

2001-12-01T23:59:59.000Z

268

Validation Analysis of the Groundwater Flow and Transport Model of the Central Nevada Test Area  

Science Conference Proceedings (OSTI)

The Central Nevada Test Area (CNTA) is a U.S. Department of Energy (DOE) site undergoing environmental restoration. The CNTA is located about 95 km northeast of Tonopah, Nevada, and 175 km southwest of Ely, Nevada (Figure 1.1). It was the site of the Faultless underground nuclear test conducted by the U.S. Atomic Energy Commission (DOE's predecessor agency) in January 1968. The purposes of this test were to gauge the seismic effects of a relatively large, high-yield detonation completed in Hot Creek Valley (outside the Nevada Test Site [NTS]) and to determine the suitability of the site for future large detonations. The yield of the Faultless underground nuclear test was between 200 kilotons and 1 megaton (DOE, 2000). A three-dimensional flow and transport model was created for the CNTA site (Pohlmann et al., 1999) and determined acceptable by DOE and the Nevada Division of Environmental Protection (NDEP) for predicting contaminant boundaries for the site.

A. Hassan; J. Chapman; H. Bekhit; B. Lyles; K. Pohlmann

2006-09-30T23:59:59.000Z

269

Emission Testing of Washington Metropolitan Area Transit Authority (WMATA) Natural Gas and Diesel Transit Buses  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emission Testing of Washington Emission Testing of Washington Metropolitan Area Transit Authority (WMATA) Natural Gas and Diesel Transit Buses M. Melendez, J. Taylor, and J. Zuboy National Renewable Energy Laboratory W.S. Wayne West Virginia University D. Smith U.S. Department of Energy Technical Report NREL/TP-540-36355 December 2005 Emission Testing of Washington Metropolitan Area Transit Authority (WMATA) Natural Gas and Diesel Transit Buses M. Melendez, J. Taylor, and J. Zuboy National Renewable Energy Laboratory W.S. Wayne West Virginia University D. Smith U.S. Department of Energy Prepared under Task No. FC05-9000 Technical Report NREL/TP-540-36355 December 2005 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov

270

Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

Irene Farnham

2011-05-01T23:59:59.000Z

271

Site characterization and monitoring data from Area 5 Pilot Wells, Nevada Test Site, Nye County, Nevada  

SciTech Connect

The Special Projects Section (SPS) of Reynolds Electrical & Engineering Co., Inc. (REECO) is responsible for characterizing the subsurface geology and hydrology of the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS) for the US Department of Energy, Nevada Operations Office (DOE/NV), Environmental Restoration and Waste Management Division, Waste Operations Branch. The three Pilot Wells that comprise the Pilot Well Project are an important part of the Area 5 Site Characterization Program designed to determine the suitability of the Area 5 RWMS for disposal of low-level waste (LLW), mixed waste (MW), and transuranic waste (TRU). The primary purpose of the Pilot Well Project is two-fold: first, to characterize important water quality and hydrologic properties of the uppermost aquifer; and second, to characterize the lithologic, stratigraphic, and hydrologic conditions which influence infiltration, redistribution, and percolation, and chemical transport through the thick vadose zone in the vicinity of the Area 5 RWMS. This report describes Pilot Well drilling and coring, geophysical logging, instrumentation and stemming, laboratory testing, and in situ testing and monitoring activities.

NONE

1994-02-01T23:59:59.000Z

272

AREA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AREA AREA FAQ # Question Response 316 vs DCAA FAQ 1 An inquiry from CH about an SBIR recipient asking if a DCAA audit is sufficient to comply with the regulation or if they need to add this to their audit they have performed yearly by a public accounting firm. 316 audits are essentially A-133 audits for for-profit entities. They DO NOT replace DCAA or other audits requested by DOE to look at indirect rates or incurred costs or closeouts. DCAA would never agree to perform A-133 or our 316 audits. They don't do A-133 audits for DOD awardees. The purpose of the audits are different, look at different things and in the few instances of overlap, from different perspectives. 316

273

Closure Report for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

This Closure Report (CR) has been prepared for the Area 25 Contaminated Waste Dumps (CWD), Corrective Action Unit (CAU) 143 in accordance with the Federal Facility Agreement and Consent Order [FFACO] (FFACO, 1996) and the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 143: Area 25, Contaminated Waste Dumps, Nevada Test Site, Nevada. CAU 143 consists of two Corrective Action Sites (CASs): 25-23-09 CWD No.1, and 25-23-03 CWD No.2. The Area 25 CWDs are historic disposal units within the Area 25 Reactor Maintenance, Assembly, and Disassembly (R-MAD), and Engine Maintenance, Assembly, and Disassembly (E-MAD) compounds located on the Nevada Test Site (NTS). The R-MAD and E-MAD facilities originally supported a portion of the Nuclear Rocket Development Station in Area 25 of the NTS. CWD No.1 CAS 25-23-09 received solid radioactive waste from the R-MAD Compound (East Trestle and West Trench Berms) and 25-23-03 CWD No.2 received solid radioactive waste from the E-MAD Compound (E-MAD Trench).

D. S. Tobiason

2002-03-01T23:59:59.000Z

274

Borehole and geohydrologic data for test hole USW UZ-6, Yucca Mountain area, Nye County, Nevada  

SciTech Connect

Test hole USW UZ-6, located 1.8 kilometers west of the Nevada Test Site on a major north-trending ridge at Yucca Mountain, was dry drilled in Tertiary tuff to a depth of 575 meters. The area near this site is being considered by the US Department of Energy for potential construction of a high-level, radioactive-waste repository. Test hole USW UZ-6 is one of seven test holes completed in the unsaturated zone as part of the US Geological Survey`s Yucca Mountain Project to characterize the potential repository site. Data pertaining to borehole drilling and construction, lithology of geologic units penetrated, and laboratory analyses for hydrologic characteristics of samples of drill-bit cuttings are included in this report.

Whitfield, M.S. Jr.; Loskot, C.L. [Geological Survey, Denver, CO (United States); Cope, C.M. [Foothill Engineering Consultants, Inc., Golden, CO (United States)

1993-04-01T23:59:59.000Z

275

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

DOE Green Energy (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

276

Geothermometry At Nevada Test And Training Range Area (Sabin, Et Al., 2004)  

Open Energy Info (EERE)

2004) 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Geothermometry Activity Date Usefulness not indicated DOE-funding Unknown Notes Groundwater data are limited to a portion of NAFR; data are more plentiful beyond the range boundaries. Geothermometry yields calculated groundwater temperatures generally ranging from 30 to 105degrees C, with a rough correlation between the SiO2-chalcedony and the Na-K-Na (Mg-corrected) geothermometers. References A. E. Sabin, J. D. Walker, J. Unruh, F. C. Monastero (2004) Toward The Development Of Occurrence Models For Geothermal Resources In The

277

Treatability Test Plan for 300 Area Uranium Stabilization through Polyphosphate Injection  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy has initiated a study into possible options for stabilizing uranium at the 300 Area using polyphosphate injection. As part of this effort, PNNL will perform bench- and field-scale treatability testing designed to evaluate the efficacy of using polyphosphate injections to reduced uranium concentrations in the groundwater to meet drinking water standards (30 ug/L) in situ. This technology works by forming phosphate minerals (autunite and apatite) in the aquifer that directly sequester the existing aqueous uranium in autunite minerals and precipitates apatite minerals for sorption and long term treatment of uranium migrating into the treatment zone, thus reducing current and future aqueous uranium concentrations. Polyphosphate injection was selected for testing based on technology screening as part of the 300-FF-5 Phase III Feasibility Study for treatment of uranium in the 300-Area.

Vermeul, Vincent R.; Williams, Mark D.; Fritz, Brad G.; Mackley, Rob D.; Mendoza, Donaldo P.; Newcomer, Darrell R.; Rockhold, Mark L.; Williams, Bruce A.; Wellman, Dawn M.

2007-06-01T23:59:59.000Z

278

Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report  

SciTech Connect

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

Bechtel Nevada

2005-03-01T23:59:59.000Z

279

Facility Closure Report for T-Tunnel (U12t), Area 12, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Facility Closure Report (FCR) has been prepared to document the actions taken to permanently close the remaining accessible areas of U12t-Tunnel (T-Tunnel) in Area 12 of the Nevada Test Site (NTS). The closure of T-Tunnel was a prerequisite to transfer facility ownership from the Defense Threat Reduction Agency (DTRA) to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Closure of the facility was accomplished with the cooperation and concurrence of both NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The purpose of this FCR is to document that the closure of T-Tunnel complied with the closure requirements specified in the Facility Closure Plan for N- and T-Tunnels Area 12, Nevada Test Site (Appendix D) and that the facility is ready for transfer to NNSA/NSO. The Facility Closure Plan (FCP) is provided in Appendix D. T-Tunnel is located approximately 42 miles north of Mercury in Area 12 of the NTS (Figure 1). Between 1970 and 1987, T-Tunnel was used for six Nuclear Weapons Effects Tests (NWETs). The tunnel was excavated horizontally into the volcanic tuffs of Rainier Mesa. The T-Tunnel complex consists of a main access drift with two NWET containment structures, a Gas Seal Plug (GSP), and a Gas Seal Door (GSD) (Figure 2). The T-Tunnel complex was mothballed in 1993 to preserve the tunnel for resumption of testing, should it happen in the future, to stop the discharge of tunnel effluent, and to prevent unauthorized access. This was accomplished by sealing the main drift GSD.

NSTec Environmental Restoration

2008-08-01T23:59:59.000Z

280

Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report  

Science Conference Proceedings (OSTI)

This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN).

Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

2007-03-23T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Conversion of non-calendar to calendar-time based preventive  

E-Print Network (OSTI)

scheduling optimization process. Design/methodology/approach ­ The algorithm utilizes estimations of work-in-process going to equipment costs. On the other hand, due to the complexity of scheduling PM tasks, heuristic (WIP) and system parameters to estimate an equivalent calendar-time schedule for PM schedules based

Fernandez, Emmanuel

282

Testing and evaluation of large-area heliostats for solar thermal applications  

DOE Green Energy (OSTI)

Two heliostats representing the state-of-the-art in glass-metal designs for central receiver (and photovoltaic tracking) applications were tested and evaluated at the National Solar Thermal Test Facility in Albuquerque, New Mexico from 1986 to 1992. These heliostats have collection areas of 148 and 200 m{sup 2} and represent low-cost designs for heliostats that employ glass-metal mirrors. The evaluation encompassed the performance and operational characteristics of the heliostats, and examined heliostat beam quality, the effect of elevated winds on beam quality, heliostat drives and controls, mirror module reflectance and durability, and the overall operational and maintenance characteristics of the two heliostats. A comprehensive presentation of the results of these and other tests is presented. The results are prefaced by a review of the development (in the United States) of heliostat technology.

Strachan, J.W.; Houser, R.M.

1993-02-01T23:59:59.000Z

283

ERRATA Sheet for ''Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada''  

Science Conference Proceedings (OSTI)

In Appendix A the second sentence of the first paragraph on Page A-1-1 of the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada, erroneously cites the EPA DQO guidance outline as (EPA, 1994). The correct citation is (EPA, 2000).

K. B. Campbell

2003-03-01T23:59:59.000Z

284

Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Closure Report (CR) documents the activities performed to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996, and the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration (SA4FER) Plan for CAU 398: Area 25 Spill Sites, Nevada Test Site, Nevada (U.S. Department of Energy, Nevada Operations Office [DOEN], 2001). CAU 398 consists of the following thirteen Corrective Action Sites (CASs) all located in Area 25 of the Nevada Test Site (NTS) (Figure 1): CAS 25-25-02, Oil Spills, CAS 25-25-03, Oil Spills, CAS 25-25-04, Oil Spills, CAS 25-25-05, Oil Spills, CAS 25-25-06, Oil Spills, CAS 25-25-07, Hydraulic Oil Spill(s), CAS 25-25-08, Hydraulic Oil Spill(s), CAS 25-25-16, Diesel Spill (from CAS 25-01-02), CAS 25-25-17, Subsurface Hydraulic Oil Spill, CAS 25-44-0 1, Fuel Spill, CAS 25-44-04, Acid Spill (from CAS 25-01-01), CAS 25-44-02, Spill, and CAS 25-44-03, Spill. Copies of the analytical results for the site verification samples are included in Appendix B. Copies of the CAU Use Restriction Information forms are included in Appendix C.

K. B. Campbell

2003-04-01T23:59:59.000Z

285

Transferability of Data Related to the Underground Test Area Project, Nevada Test Site, Nye County, Nevada: Revision 0  

SciTech Connect

This document is the collaborative effort of the members of an ad hoc subcommittee of the Underground Test Area (UGTA) Technical Working Group (TWG). The UGTA Project relies on data from a variety of sources; therefore, a process is needed to identify relevant factors for determining whether material-property data collected from other areas can be used to support groundwater flow, radionuclide transport, and other models within a Corrective Action Unit (CAU), and for documenting the data transfer decision and process. This document describes the overall data transfer process. Separate Parameter Descriptions will be prepared that provide information for selected specific parameters as determined by the U.S. Department of Energy (DOE) UGTA Project Manager. This document and its accompanying appendices do not provide the specific criteria to be used for transfer of data for specific uses. Rather, the criteria will be established by separate parameter-specific and model-specific Data Transfer Protocols. The CAU Data Documentation Packages and data analysis reports will apply the protocols and provide or reference a document with the data transfer evaluations and decisions.

Stoller-Navarro Joint Venture

2004-06-24T23:59:59.000Z

286

Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

T. M. Fitzmaurice

2000-08-01T23:59:59.000Z

287

Closure Report for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect

The Area 25 Vehicle Washdown, Corrective Action Unit (CAU) 240, was clean-closed following the approved Corrective Action Decision Document closure alternative and in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996). The CAU consists of thee Corrective Action Sites (CASs): 25-07-01 - Vehicle Washdown Area (Propellant Pad); 25-07-02 - Vehicle Washdown Area (F and J Roads Pad); and 25-07-03 - Vehicle Washdown Station (RADSAFE Pad). Characterization activities indicated that only CAS 25-07-02 (F and J Roads Pad) contained constituents of concern (COCs) above action levels and required remediation. The COCs detected were Total Petroleum Hydrocarbons (TPH) as diesel, cesium-137, and strontium-90. The F and J Roads Pad may have been used for the decontamination of vehicles and possibly disassembled engine and reactor parts from Test Cell C. Activities occurred there during the 1960s through early 1970s. The F and J Roads Pad consisted of a 9- by 5-meter (m) (30- by 15-foot [ft]) concrete pad and a 14- by 13-m (46-by 43-ft) gravel sump. The clean-closure corrective action consisted of excavation, disposal, verification sampling, backfilling, and regrading. Closure activities began on August 21, 2000, and ended on September 19, 2000. Waste disposal activities were completed on December 12, 2000. A total of 172 cubic meters (223 cubic yards) of impacted soil was excavated and disposed. The concrete pad was also removed and disposed. Verification samples were collected from the bottom and sidewalls of the excavation and analyzed for TPH diesel and 20-minute gamma spectroscopy. The sample results indicated that all impacted soil above remediation standards was removed. The closure was completed following the approved Corrective Action Plan. All impacted waste was disposed in the Area 6 Hydrocarbon Landfill. All non-impacted debris was disposed in the Area 9 Construction Landfill and the Area 23 Sanitary Landfill.

D. L. Gustafason

2001-03-01T23:59:59.000Z

288

Site environmental report for calendar year 1996  

Science Conference Proceedings (OSTI)

This Annual Site Environmental Report presents information pertaining to environmental activities conducted during calendar year 1996 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN-Grand Junction, the Facility Operations and Support contractor for the GJO, prepared this report in accordance with the requirements of DOE Order 5400.1, General Environmental Protection Program, and supplemental guidance from DOE Headquarters. This report applies specifically to the GJO facility; the Monticello Mill Tailings Site Environmental Summary for Calendar Year 1996 was prepared as a separate document. Primary GJO activities involve laboratory analysis of environmental samples from GJO and other DOE sites and site remediation of contamination caused by previous uranium mill operations. Activities at the GJO are conducted in compliance with applicable Federal, State, and local regulations and requirements and as directed by applicable DOE orders. Environmental monitoring is performed on air emissions, sewer effluent, surface water and groundwater, and wetlands restoration. Wastes are generated from the Analytical Laboratory, site remediation, and facility operation.

NONE

1997-06-01T23:59:59.000Z

289

Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect

The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

NSTec Environmental Management

2008-09-01T23:59:59.000Z

290

Corrective action investigation plan for CAU No. 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This Correction Action Investigation Plan contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the Area 3 Landfill Complex, CAU No. 424, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, nevada. The CAU 424 is comprised of eight individual landfill sites that are located around and within the perimeter of the Area 3 Compound. Due to the unregulated disposal activities commonly associated with early landfill operations, an investigation will be conducted at each CAS to complete the following tasks: identify the presence and nature of possible contaminant migration from the landfills; determine the vertical and lateral extent of possible contaminant migration; ascertain the potential impact to human health and the environment; and provide sufficient information and data to develop and evaluate appropriate corrective action strategies for each CAS.

NONE

1997-04-01T23:59:59.000Z

291

Three-Dimensional Bayesian Geostatistical Aquifer Characterization at the Hanford 300 Area using Tracer Test Data  

SciTech Connect

Tracer testing under natural or forced gradient flow holds the potential to provide useful information for characterizing subsurface properties, through monitoring, modeling and interpretation of the tracer plume migration in an aquifer. Non-reactive tracer experiments were conducted at the Hanford 300 Area, along with constant-rate injection tests and electromagnetic borehole flowmeter (EBF) profiling. A Bayesian data assimilation technique, the method of anchored distributions (MAD) [Rubin et al., 2010], was applied to assimilate the experimental tracer test data with the other types of data and to infer the three-dimensional heterogeneous structure of the hydraulic conductivity in the saturated zone of the Hanford formation. In this study, the Bayesian prior information on the underlying random hydraulic conductivity field was obtained from previous field characterization efforts using the constant-rate injection tests and the EBF data. The posterior distribution of the conductivity field was obtained by further conditioning the field on the temporal moments of tracer breakthrough curves at various observation wells. MAD was implemented with the massively-parallel three-dimensional flow and transport code PFLOTRAN to cope with the highly transient flow boundary conditions at the site and to meet the computational demands of MAD. A synthetic study proved that the proposed method could effectively invert tracer test data to capture the essential spatial heterogeneity of the three-dimensional hydraulic conductivity field. Application of MAD to actual field data shows that the hydrogeological model, when conditioned on the tracer test data, can reproduce the tracer transport behavior better than the field characterized without the tracer test data. This study successfully demonstrates that MAD can sequentially assimilate multi-scale multi-type field data through a consistent Bayesian framework.

Chen, Xingyuan; Murakami, Haruko; Hahn, Melanie S.; Hammond, Glenn E.; Rockhold, Mark L.; Zachara, John M.; Rubin, Yoram

2012-06-01T23:59:59.000Z

292

Closure Report for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Action Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).

T. M. Fitzmaurice

2001-04-01T23:59:59.000Z

293

Standard Test Method for Gravimetric Determination of Nonvolatile Residue (NVR) in Environmentally Controlled Areas for Spacecraft  

E-Print Network (OSTI)

1.1 This test method covers the determination of nonvolatile residue (NVR) fallout in environmentally controlled areas used for the assembly, testing, and processing of spacecraft. 1.2 The NVR of interest is that which is deposited on sampling plate surfaces at room temperature: it is left to the user to infer the relationship between the NVR found on the sampling plate surface and that found on any other surfaces. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 1.4 The values stated in SI units are to be regarded as standard. No other units of measurement are included in this standard.

American Society for Testing and Materials. Philadelphia

2008-01-01T23:59:59.000Z

294

Knoxville Area Transit: Propane Hybrid ElectricTrolleys; Advanced Technology Vehicles in Service, Advanced Vehicle Testing Activity (Fact Sheet)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

website and in print publications. website and in print publications. TESTING ADVANCED VEHICLES KNOXVILLE AREA TRANSIT ◆ PROPANE HYBRID ELECTRIC TROLLEYS Knoxville Area Transit PROPANE HYBRID ELECTRIC TROLLEYS NREL/PIX 13795 KNOXVILLE AREA TRANSIT (KAT) is recognized nationally for its exceptional service to the City of Knoxville, Tennessee. KAT received the American Public Transportation Associa- tion's prestigious Outstanding Achievement Award in 2004.

295

Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations.

IT Corporation, Las Vegas

2002-04-24T23:59:59.000Z

296

Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site  

Science Conference Proceedings (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized.

NONE

1997-05-01T23:59:59.000Z

297

AND OTHER TEST AREAS USED FOR U N D E R G R O U N  

Office of Legacy Management (LM)

AND OTHER TEST AREAS USED FOR U AND OTHER TEST AREAS USED FOR U N D E R G R O U N D NUCLEAR .DETONATIONS -9.\c January through December 1996 by the Monitoring Applications Laboratory National Enviscnmental Research Center LT . S . EFTtPlgRO%RIENFA& PROTECTIQN AGENCY LPS Vegas, Nevada -"& -% ~d*.".::. Published Hay 1975 This work p e r f o w e d under a Memorandum o f Understanding No. AT(26-1)-539) for the U. S. ENERGY RESEARCH B D E V E L O P M E X T ABMINISTRATIQN d ~ P v . a - r . . . - . -.. . . . . * . "+ . - : I - : : - ... 1-11.; ~ ~ ~ % ~ ! ~ $ ' ; : L : ; ~ : ~ ~ ~ ~ . . T h i s r e p o r t was prepared a s an account of work sponsored by t h e United S t a t e s Government. N e i t h e r t h e United S t a t e s nor t h e United S t a t e s Energy Research and Development A d m i n i s t r a t i o n , n o r any of t h e i r employees, nor any of t h e i r c o n

298

Closure Report for Corrective Action Unit 135: Areas 25 Underground Storage Tanks, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 135, Area 25 Underground Storage Tanks, was closed in accordance with the approved Corrective Action Plan (DOE/NV, 2000). CAU 135 consists of three Corrective Action Sites (CAS). Two of these CAS's were identified in the Corrective Action Investigation Data Quality Objective meeting as being improperly identified as underground storage tanks. CAS 25-02-03 identified as the Deluge Valve Pit was actually an underground electrical vault and CAS 25-02-10 identified as an Underground Storage Tank was actually a former above ground storage tank filled with demineralized water. Both of these CAS's are recommended for a no further action closure. CAS 25-02-01 the Underground Storage Tanks commonly referred to as the Engine Maintenance Assembly and Disassembly Waste Holdup Tanks and Vault was closed by decontaminating the vault structure and conducting a radiological verification survey to document compliance with the Nevada Test Site unrestricted use release criteria. The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine Maintenance, Assembly, and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive and cell service area drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999, discussed in ''The Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada'' (DOE/NV, 199a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples exceeded the preliminary action levels for polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. The CAU 135 closure activities consisted of scabbling radiological ''hot spots'' from the concrete vault, and the drilling removal of the cement-lined vault sump. Field activities began on November 28, 2000, and ended on December 4, 2000. After verification samples were collected, the vault was repaired with cement. The concrete vault sump, soil excavated beneath the sump, and compactable hot line trash were disposed at the Area 23 Sanitary Landfill. The vault interior was field surveyed following the removal of waste to verify that unrestricted release criteria had been achieved. Since the site is closed by unrestricted release decontamination and verification, post-closure care is not required.

D. H. Cox

2001-06-01T23:59:59.000Z

299

Corrective Action Plan for Corrective Action Unit 407: Roller Coaster RADSAFE Area, Tonopah Test Range, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan (CAP) has been prepared for the Roller Coaster RADSAFE Area Corrective Action Unit 407 in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved Corrective Action Alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). The RCRSA was used during May and June of 1963 to decontaminate vehicles, equipment, and personnel from the Clean Slate tests. The Constituents of Concern (COCs) identified during the site characterization include plutonium, uranium, and americium. No other COCS were identified. The following closure actions will be implemented under this plan: (1) Remove and dispose of surface soils which are over three times background for the area. Soils identified for removal will be disposed of at an approved disposal facility. Excavated areas will be backfilled with clean borrow soil fi-om a nearby location. (2) An engineered cover will be constructed over the waste disposal pit area where subsurface COCS will remain. (3) Upon completion of the closure and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site. Barbed wire fencing will be installed along the perimeter of this unit. Post closure monitoring will consist of site inspections to determine the condition of the engineered cover. Any identified maintenance and repair requirements will be remedied within 90 working days of discovery and documented in writing at the time of repair. Results of all inspections/repairs for a given year will be addressed in a single report submitted annually to the NDEP.

T. M. Fitzmaurice

2000-05-01T23:59:59.000Z

300

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 115: AREA 25 TEST CELL A FACILITY, NEVADA TEST SITE, NEVADA  

SciTech Connect

This Closure Report (CR) describes the activities performed to close CAU 115, Area 25 Test Cell A Facility, as presented in the NDEP-approved SAFER Plan (NNSA/NSO, 2004). The SAFER Plan includes a summary of the site history, process knowledge, and closure standards. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical and radiological data to confirm that the remediation goals were met and to document final site conditions. The approved closure alternative as presented in the SAFER Plan for CAU 115 (NNSA/NSO, 2004) was clean closure; however, closure in place was implemented under a Record of Technical Change (ROTC) to the SAFER Plan when radiological surveys indicated that the concrete reactor pad was radiologically activated and could not be decontaminated to meet free release levels. The ROTC is included as Appendix G of this report. The objectives of closure were to remove any trapped residual liquids and gases, dispose regulated and hazardous waste, decontaminate removable radiological contamination, demolish and dispose aboveground structures, remove the dewar as a best management practice (BMP), and characterize and restrict access to all remaining radiological contamination. Radiological contaminants of concern (COCs) included cobalt-60, cesium-137, strontium-90, uranium-234/235/236/238, and plutonium-239/240. Additional COCs included Resource Conservation and Recovery Act (RCRA) metals, polychlorinated biphenyls (PCBs), and asbestos.

NA

2006-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Calendar Year 2011 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Calendar Year 2011 RSS December 21, 2011 Inspection Report: INS-L-12-01 Follow-up Review of Control and Accountability of Emergency Communication Network Equipment December 16, 2011 Inspection Report: INS-RA-L-12-01 Waste Disposal and Recovery Act Efforts at the Oak Ridge Reservation November 28, 2011 Special Report: OAS-RA-L-12-01 Special Inquiry on the Office of the Chief Financial Officer's Information Technology Expenditures November 15, 2011 Evaluation Report: OAS-M-12-01 The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011 November 10, 2011 Special Report: IG-0858 Management Challenges at the Department of Energy - Fiscal Year 2012 November 9, 2011 Audit Report: OAS-RA-12-02 The State of Nevada's Implementation of the Energy Efficiency and

302

Calendar Year 1999 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1999 1999 Calendar Year 1999 Documents marked with the * are published in Adobe PDF format. 1999-12-22 - Report IG-0455: * Inspection Report on "Inspection of the Sale of a Paragon Supercomputer by Sandia National Laboratories" 1999-12-16 - Report INS-O-00-02: * Inspection Report on "Inspection of Alleged Improprieties Regarding Issuance of a Contract" 1999-12-15 - Report IG-0454:* Audit Report on "Waste Incineration at the Idaho National Engineering and Environmental Laboratory" 1999-12-10 - Report WR-B-OO-02:* Audit Report on "Properties and Facilities at Grand Junction" 1999-11-30 - Report INS-O-00-01:* Inspection Report on "Inspection of Selected Issues of the Chem-Bio Facility at the Oak Ridge National Laboratory"

303

Calendar Year 1997 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Calendar Year 1997 Documents marked with the * are published in Adobe PDF format. 1997-12-23 - Report IG-0416:* Audit of Support Services Subcontracts at Argonne National Laboratory 1997-12-10 - Report ER-B-98-05:* Audit of the Department of Energy's Contracts with Envirocare of Utah, Inc. 1997-12-05 - Report IG-0414:* Audit of the Department of Energy's Management of Field Contractor Employees Assigned to Headquarters and Other Federal Agencies 1997-12-04 - Report IG-0415:* Audit of Departmental Receipt of Final Deliverables for Grant Awards 1997-11-24 - Report ER-B-98-04:* Audit of Selected Government-Funded Grants and Contracts at Princeton University 1997-11-19 - Report WR-B-98-01:* Audit of the Radioactive Liquid Waste Treatment Facility Operations at the

304

Calendar Year 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Calendar Year 2004 RSS December 14, 2004 Audit Report: IG-0669 Use and Management of Mobile Communications Services December 10, 2004 Audit Report: OAS-L-05-01 Federal Managers' Financial Integrity Act Audit Report December 8, 2004 Inspection Report: IG-0668 Concerns Regarding Academic Programs at the Bonneville Power Administration and the Savannah River Operations Office November 30, 2004 Special Report: IG-0667 Management Challenges at the Department November 30, 2004 Audit Report: IG-0666 Audit Report on "The Los Alamos Neutron Science Center October 28, 2004 Audit Report: IG-0665 Restoration of the Monticello Mill Site at Monticello, Utah September 27, 2004 Audit Report: IG-0664 Property Disposals at the Yucca Mountain Project September 24, 2004 Inspection Report: IG-0663

305

Calendar Year 1996 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Calendar Year 1996 Documents marked with the * are published in Adobe PDF format. 1996-11-21 - Report IG-0398: Special Report on the Audit of the Management of Department of Energy Construction Projects 1996-11-15 - Report WR-B-97-03: Audit of Groundwater Monitoring at Hanford 1996-11-07 - Report WR-B-97-02: Audit of Bus Service Subsidies at the Idaho National Engineering Laboratory 1996-11-06 - Report WR-B-97-01: Audit of Electrical System Construction Projects at the Nevada Operations Office 1996-10-22 - Report ER-B-97-01: Audit of Economic Development Grants and a Cooperative Agreement with East Tennessee Not-For-Profit Organizations 1996-10-13 - Report INS-9601: Report on the Intelligence Oversight Inspection of the Special Technologies Laboratory 1996-10-07 - Report IG-0397:*

306

Calendar Year 2007 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Calendar Year 2007 RSS December 19, 2007 Inspection Report: IG-0784 The Department of Energy's Pandemic Influenza Planning December 18, 2007 Audit Report: OAS-M-08-04 Management Controls over Operations of the Integrated Disposal Facility atthe Hanford Site December 17, 2007 Audit Report: IG-0783 Beryllium Surface Contamination at the Y-12 National Security Complex December 13, 2007 Special Report: IG-0782 Management Challenges at the Department of Energy December 11, 2007 Audit Report: OAS-L-08-03 The Department of Energy's Implementation of Revised OMB Circular No. A-123 December 11, 2007 Audit Report: OAS-M-08-03 Management Controls over Implementation of the Homeland Defense Equipment Reuse Program November 28, 2007 Audit Letter Report: OAS-L-08-02 Department's Implementation of the Strategic Integrated Procurement

307

Calendar Year 2012 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Calendar Year 2012 RSS December 21, 2012 Audit Report: OAS-L-13-03 The Management of the Plateau Remediation Contract December 21, 2012 Audit Report: IG-0879 Naval Reactors Information Technology System Development Efforts December 17, 2012 Audit Report: OAS-FS-13-08 Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2012 December 11, 2012 Audit Report: IG-0878 Follow-up Audit of the Department's Cyber Security Incident Management Program December 3, 2012 Audit Report: OAS-RA-L-13-02 The Department's Implementation of Financial Incentive Programs under the Energy Efficiency and Conservation Block Grant Program November 30, 2012 Inspection Report: INS-O-13-02 Tactical Response Force Pursuit Operations at Idaho National Laboratory

308

Calendar Year 2010 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0 0 Calendar Year 2010 RSS December 20, 2010 Audit Report: OAS-RA-L-11-02 Audit of Environmental Cleanup Projects Funded by the Recovery Act at the Y-12 National Security Complex December 3, 2010 Investigative Report: INV-RA-11-01 Management Alert on the State Energy Efficient Appliance Rebate Program November 30, 2010 Audit Report: OAS-RA-11-03 The Department of Energy's Weatherization Assistance Program under the American Recovery and Reinvestment Act for the City of Phoenix - Agreed-Upon Procedures November 17, 2010 Inspection Letter Report: INS-L-11-01 Letter Report on "Inspection of Allegations Relating to Irregularities in the Human Reliability Program and Alcohol Abuse within the Office of Secure Transportation November 16, 2010 Special Report: IG-0844

309

Calendar Year 1998 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

8 8 Calendar Year 1998 Documents marked with the * are published in Adobe PDF format. 1998-12-21 - Report ER-B-99-01:* Audit Report on "Decontamination and Decommissioning at the East Tennessee Technology Park" 1998-12-04 - Report WR-B-99-01:* Audit Report on "Transportation Safeguards Division Courier Work Schedule and Escort Vehicle Replacements" 1998-12-18 - Report IG-0434:* Audit Report on "Waste Inventory Data at Oak Ridge and Savannah River" 1998-12-03 - Report IG-0433:* Report on "Inspection of Department of Energy Conference Policies and Practices" 1998-11-20 - Report IG-0432:* Audit Report on "The U.S. Department of Energy's Efforts to Increase The Financial Responsibility Of Its Major For-Profit Operating Contractors"

310

Calendar Year 2001 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 Calendar Year 2001 Documents marked with the * are published in Adobe PDF format. 2001-12-21 - Report IG-0537:* Audit Report on "Telecommunications Infrastructure" 2001-12-20 - Report IG-0536:* Inspection Report on "Follow-on Inspection of the Department of Energy's Value Engineering Program" 2001-12-21 - Report IG-0538:* Special Report on "Management Challenges at the Department of Energy" 2001-12-18 - Report IG-0535:* Audit Report on "Management of the Stockpile Surveillance Program's Significant Finding Investigations" 2001-12 - Report IG-0534:* Inspection Report on "Inspection of Lawrence Livermore National Laboratory Protective Force and Special Response Team " 2001-12-07 - Report IG-0533:* Inspection Report on "Inspection of the Department of Energy's Automated

311

Joint Outreach Task Group (JOTG) Calendar: June  

NLE Websites -- All DOE Office Websites (Extended Search)

Former Worker Program (FWP) Home Covered Sites/Populations › Construction Worker Screening Projects › Production Worker Screening Projects › Supplemental Screening Program › Beryllium Vendor Screening Program Upcoming Events Program Implementation Outreach Medical Screening - Conventional Medical Screening - Early Lung Cancer Detection Communicating Results Protecting Participant Information Sharing De-identified Data Chronic Beryllium Disease Awareness Joint Outreach Task Group (JOTG) Worker Testimonials Contact Us FWP Scientific Publications FWP Documents Related Links Office of Health and Safety Home Page HSS Logo Joint Outreach Task Group Calendar: June 2013 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 26 27 28 29 30 31 1 2 3 4 FWP Event Mound Miamisburg, OH

312

Calendar Year 2006 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Calendar Year 2006 RSS December 18, 2006 Audit Letter Report: OAS-L-07-04 Inquiry to the Hotline Complaint on Possible Design Mistakes and Cost Overruns of the Linac Coherent Light Source Project at Stanford Linear Accelerator Center December 18, 2006 Audit Report: IG-0750 The Federal Energy Regulatory Commission's Program to Oversee Hydroelectric Dams December 14, 2006 Audit Report: IG-0749 The Department's Energy, Science,and Environment Sites' Implementationof the Design Basis Threat December 13, 2006 Special Report: IG-0748 Management Challenges at the Department of Energy December 5, 2006 Audit Report: IG-0747 The Department of Energy's Use of the Strategic Petroleum Reserve in Response to Hurricanes Katrina and Rita November 29, 2006 Inspection Report: IG-0746

313

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Calendar Year 2005 RSS December 30, 2005 Audit Report: OAS-M-06-03 Management Controls over the University of California's Contributions to the Los Alamos National Laboratory Foundation December 21, 2005 Audit Report: IG-0713 Status of the Mixed Oxide Fuel Fabrication Facility December 20, 2005 Audit Report: OAS-L-06-04 Federal Managers' Financial Integrity Act December 20, 2005 Audit Report: OAS-L-06-03 Defense Waste Processing Facility Operations at the Savannah River Site December 14, 2005 Special Report: IG-0712 Management Challenges at the Department of Energy December 5, 2005 Audit Report: IG-0711 Demolition and Replacement of Hanford's Radiological Calibration Laboratory November 25, 2005 Audit Report: OAS-M-06-02 Management Controls over Assessing Natural Resource Damage at Rocky Flats

314

Calendar Year 2002 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Calendar Year 2002 Documents marked with the * are published in Adobe PDF format. 2002-12-31 - Report IG-0580:* Special Report on "Management Challenges at the Department of Energy" 2002-12-23 - Report IG-0579:* Audit Report on "The Department's Unclassified Foreign Visits and Assignments Program" 2002-12-19 - Report IG-0578:* Inspection Report on "Inspection of Explosives Safety at Selected Department of Energy Sites" 2002-12-18 - Report IG-0577:* Audit Report on "Planned Characterization Capability At The Waste Isolation Pilot Plant" 2002-12-03 - Report OAS-L-03-03:* Audit Report on "Follow-Up Audit on the Department's Management of Field Contractor Employees Assigned to Headquarters and Other Federal Agencies"

315

Closure plan for CAU No. 93: Area 6 steam cleaning effluent ponds, Nevada Test Site  

SciTech Connect

The steam cleaning effluent ponds (SCEP) waste unit is located in Area 6 at the Nevada Test Site (NTS). Nevada Operations Office operates the NTS and has entered into a trilateral agreement with the State of Nevada and the Defense Special Weapons Agency (DSWA). The trilateral agreement provides a framework for identifying, characterizing, remediating, and closing environmental sites on the NTS and associated bombing ranges. The SCEP waste unit consists of: two steam cleaning effluent ponds; layout pad and associated grease trap; Building 6-623 steam cleaning pad; test pad; Building 6-623 grease trap; Building 6-800 steam cleaning pad; Building 6-800 separator; Building 6-621 sump; and the concrete asbestos piping connecting these components to both SCEPs. Clean closure is the recommended closure strategy for the majority of the components within this CAU. Four components of the unit (Building 6-621 Sump, Test Pad Grease Trap, Building 6-623 Steam Cleaning Pad, and North SCEP pipeline) are recommended to be closed in place. This closure plan provides the strategy and backup information necessary to support the clean closure of each of the individual components within CAU 93. Analytical data generated during the characterization field work and earlier sampling events indicates the majority of CAU 93 soil and infrastructure is non-hazardous (i.e., impacted primarily with petroleum hydrocarbons).

NONE

1997-04-01T23:59:59.000Z

316

Hydrologic Resources Management Program and Underground Test Area Project FY 2000 Progress Report  

SciTech Connect

This report highlights the results of FY 2000 technical studies conducted by the Analytical and Nuclear Chemistry Division (ANCD) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrology and Radionuclide Migration Program (HRMP) and Underground Test Area (UGTA) Project. This is the latest in a series of annual reports published by LLNL-ANCD to document recent investigations of radionuclide migration and transport processes at the Nevada Test Site (NTS). The HRMP is sponsored by Defense Programs (DP) at the U.S. Department of Energy, Nevada Operations Office (DOENV), and supports DP operations at the NTS through studies of radiochemical and hydrologic processes that are relevant to the DP mission. Other organizations that support the HRMP include Los Alamos National Laboratory (LANL), the U.S. Geological Survey (USGS), the Desert Research Institute (DRI) of the University of Nevada, the U.S. Environmental Protection Agency (EPS), and Bechtel Nevada (BN). The UGTA Project is sponsored by the Environmental Management (EM) program at DOENV; its goal is to determine the extent of radionuclide contamination in groundwater resulting from underground nuclear testing at the NTS. The project strategy follows guidelines set forth in a Federal Facilities Agreement and Consent Order between the U.S. Department of Energy, the U.S. Department of Defense, and the State of Nevada. Participating contractors include LLNL (both ANCD and the Energy and Environmental Sciences Directorate), LANL, USGS, DRI, BN, and IT Corporation (with subcontract support from Geotrans Inc.).

Davisson, M L; Eaton, G F; Hakemi, N L; Hudson, G B; Hutcheon, I D; Lau, C A; Kersting, A B; Kenneally, J M; Moran, J E; Phinney, D L; Rose, T P; Smith, D K; Sylwester, E R; Wang, L; Williams, R; Zavarin, M

2001-07-01T23:59:59.000Z

317

100 Area soil washing: Bench scale tests on 116-F-4 pluto crib soil  

SciTech Connect

The Pacific Northwest Laboratory conducted a bench-scale treatability study on a pluto crib soil sample from 100 Area of the Hanford Site. The objective of this study was to evaluate the use of physical separation (wet sieving), treatment processes (attrition scrubbing, and autogenous surface grinding), and chemical extraction methods as a means of separating radioactively-contaminated soil fractions from uncontaminated soil fractions. The soil washing treatability study was conducted on a soil sample from the 116-F-4 Pluto Crib that had been dug up as part of an excavation treatability study. Trace element analyses of this soil showed no elevated concentrations above typically uncontaminated soil background levels. Data on the distribution of radionuclide in various size fractions indicated that the soil-washing tests should be focused on the gravel and sand fractions of the 116-F-4 soil. The radionuclide data also showed that {sup 137}Cs was the only contaminant in this soil that exceeded the test performance goal (TPG). Therefore, the effectiveness of subsequent soil-washing tests for 116-F-4 soil was evaluated on the basis of activity attenuation of {sup 137}Cs in the gravel- and sand-size fractions.

Field, J.G.

1994-06-10T23:59:59.000Z

318

Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report  

Science Conference Proceedings (OSTI)

This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier Mesa and USGS HGH No.2 WW2 located in Yucca Flat. In addition, three springs were sampled White Rock Spring and Captain Jack Spring in Area 12 on Rainier Mesa and Topopah Spring in Area 29. Chapter 3 is a compilation of existing noble gas data that has been reviewed and edited to remove inconsistencies in presentation of total vs. single isotope noble gas values reported in the previous HRMP and UGTA progress reports. Chapter 4 is a summary of the results of batch sorption and desorption experiments performed to determine the distribution coefficients (Kd) of Pu(IV), Np(V), U(VI), Cs and Sr to zeolitized tuff (tuff confining unit, TCU) and carbonate (lower carbonate aquifer, LCA) rocks in synthetic NTS groundwater Chapter 5 is a summary of the results of a series of flow-cell experiments performed to examine Np(V) and Pu(V) sorption to and desorption from goethite. Np and Pu desorption occur at a faster rate and to a greater extent than previously reported. In addition, oxidation changes occurred with the Pu whereby the surface-sorbed Pu(IV) was reoxidized to aqueous Pu(V) during desorption.

Culham, H W; Eaton, G F; Genetti, V; Hu, Q; Kersting, A B; Lindvall, R E; Moran, J E; Blasiyh Nuno, G A; Powell, B A; Rose, T P; Singleton, M J; Williams, R W; Zavarin, M; Zhao, P

2008-04-08T23:59:59.000Z

319

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

320

In Situ Bioremediation Interim Remedial Action Report, Test Area North, Operable Unit 1-07B  

E-Print Network (OSTI)

This Interim Remedial Action Report is for the in situ bioremediation remedial component of Operable Unit 1-07B at Test Area North at the Idaho National Laboratory. Under U.S. Environmental Protection Agency guidance, an interim report for a long-term groundwater remedial action provides a chronology of events and a description of the remedial action facilities, systems, components, and operating documents that lead to a declaration that the system is operational and functional. It is the conclusion of this report that the in situ bioremediation remedial component includes the infrastructure and programs necessary to achieve the objectives of the in situ bioremediation remedial component for contaminated groundwater in the vicinity of the TSF-05 well; therefore, it can be deemed operational and functional. iii ivCONTENTS ABSTRACT.................................................................................................................................................iii

Unit -b; Prepared For The

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site  

Science Conference Proceedings (OSTI)

The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure cover has been placed on unit U-3ax/bl (Corrective Action Unit 110) at the Area 3 RWMS. Monolayer-evapotranspirative closure cover designs for the U-3ah/at and U-3bh units are provided in this plan. The current-design closure cover thickness is 3 meters (10 feet). The final design cover will have an optimized cover thickness, which is expected to be less than 3 m (10 ft). Although waste operations at the Area 3 RWMS have ceased at the end of June 2006, disposal capacity is available for future disposals at the U-3ah/at and U-3bh units. The Area 3 RWMS is expected to start closure activities in fiscal year 2025, which include the development of final performance assessment and composite analysis documents, closure plan, closure cover design for construction, cover construction, and initiation of the post-closure care and monitoring activities. Current monitoring at the Area 3 RWMS includes monitoring the cover of the closed mixed waste unit U-3ax/bl as required by the Nevada Department of Environmental Protection, and others required under federal regulations and DOE orders. Monitoring data, collected via sensors and analysis of samples, are needed to evaluate radiation doses to the general public, for performance assessment maintenance, to demonstrate regulatory compliance, and to evaluate the actual performance of the RWMSs. Monitoring provides data to ensure the integrity and performance of waste disposal units. The monitoring program is designed to forewarn management and regulators of any failure and need for mitigating actions. The plan describes the program for monitoring direct radiation, air, vadose zone, biota, groundwater, meteorology, and subsidence. The requirements of post-closure cover maintenance and monitoring will be determined in the final closure plan.

NSTec Environmental Management

2007-09-01T23:59:59.000Z

322

Closure Report for Corrective Action Unit 346: Areas 8, 10 Housekeeping Sites, Nevada Test Site, Nevada  

SciTech Connect

This Closure Report documents the closure activities conducted for Corrective Action Unit (CAU) 346: Areas 8, 10 Housekeeping Sites. CAU 346 is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and consists of the following 14 Corrective Action Sites (CASs) located in Areas 8 and 10 of the Nevada Test Site (NTS): (1) CAS 08-22-04: Drums (2); (2) CAS 08-22-11: Drums; Bucket; (3) CAS 08-24-02: Battery; (4) CAS 10-14-01: Transformer; (5) CAS 10-22-06: Drum (Gas Block); (6) CAS 10-22-10: Drum (Gas Block); (7) CAS 10-22-12: Drum (Gas Block); (8) CAS 10-22-13: Drum (Gas Block); (9) CAS 10-22-16: Drum (Gas Block); (10) CAS 10-22-22: Drum; (11) CAS 10-22-25: Drum; (12) CAS 10-22-36: Paint Can; (13) CAS 10-22-37: Gas Block; and (14) CAS 10-24-11: Battery. Closure activities consisted of closing each CAS by removing debris and/or material, disposing of the generated waste, and verifying that each site was clean-closed by visual inspection and/or laboratory analysis of soil verification samples.

K. B. Campbell

2003-08-01T23:59:59.000Z

323

THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests  

Science Conference Proceedings (OSTI)

This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be shared between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.

Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.; Rudolph, Frank; Murthy, Shashikala; Arseneaux, Jim; Loutan, Clyde; Chowdhury, S.

2010-08-31T23:59:59.000Z

324

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at diversity@hq.doe.gov to let us know about other upcoming events. To learn more about the Department's diversity initiatives, visit this page. July 2013 Sun Mon Tue Wed Thu Fri Sat 30 1 2 3 4 5 6 Independence Day 3:30PM EDT Filipino-American Friendship Day 3:30PM EDT 7 8 9 10 11 12 13 World Population Day 3:30PM EDT 14 15 16 17 18 19 20 Organization of Chinese Americans Federal Leadership Training 2:15PM to 5:15PM EDT 2013 National Council of La Raza Leadership Development Workshops 4:00PM to 6:00PM EDT

325

Annual Waste Minimization Summary Report, Calendar Year 2008  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2008.

NSTec Environmental Management

2009-02-01T23:59:59.000Z

326

Comprehensive baseline environmental audit of former underground test areas in Colorado, Nevada, and New Mexico  

SciTech Connect

This report documents the results of the Comprehensive Baseline Environmental Audit of Former Underground Test Areas (FUTAS) in the States of Colorado, Nevada, and New Mexico. DOE and contractor systems for management of environmental protection activities on the Nevada Test Site (NTS) were not within the scope of the audit. The audit was conducted May 16-May 26, 1994, by the Office of Environmental Audit (EH-24). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program{close_quotes}, establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is to enhance environmental protection and minimize risk to public health and the environment. EH-24 accomplishes its mission using systematic and periodic evaluations of DOE`s environmental programs within line organizations and supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. These evaluations function as a vehicle through which the Secretary and program managers are apprised of the status and vulnerabilities of Departmental environmental activities and environmental management systems. Several types of evaluations are conducted, including: (1) comprehensive baseline environmental audits; (2) routine environmental audits; (3) environmental management assessments; and (4) special issue reviews.

1994-05-01T23:59:59.000Z

327

TESTING GROUND BASED GEOPHYSICAL TECHNIQUES TO REFINE ELECTROMAGNETIC SURVEYS NORTH OF THE 300 AREA HANFORD WASHINGTON  

SciTech Connect

Airborne electromagnetic (AEM) surveys were flown during fiscal year (FY) 2008 within the 600 Area in an attempt to characterize the underlying subsurface and to aid in the closure and remediation design study goals for the 200-PO-1 Groundwater Operable Unit (OU). The rationale for using the AEM surveys was that airborne surveys can cover large areas rapidly at relatively low costs with minimal cultural impact, and observed geo-electrical anomalies could be correlated with important subsurface geologic and hydrogeologic features. Initial interpretation of the AEM surveys indicated a tenuous correlation with the underlying geology, from which several anomalous zones likely associated with channels/erosional features incised into the Ringold units were identified near the River Corridor. Preliminary modeling resulted in a slightly improved correlation but revealed that more information was required to constrain the modeling (SGW-39674, Airborne Electromagnetic Survey Report, 200-PO-1 Groundwater Operable Unit, 600 Area, Hanford Site). Both time-and frequency domain AEM surveys were collected with the densest coverage occurring adjacent to the Columbia River Corridor. Time domain surveys targeted deeper subsurface features (e.g., top-of-basalt) and were acquired using the HeliGEOTEM{reg_sign} system along north-south flight lines with a nominal 400 m (1,312 ft) spacing. The frequency domain RESOLVE system acquired electromagnetic (EM) data along tighter spaced (100 m [328 ft] and 200 m [656 ft]) north-south profiles in the eastern fifth of the 200-PO-1 Groundwater OU (immediately adjacent to the River Corridor). The overall goal of this study is to provide further quantification of the AEM survey results, using ground based geophysical methods, and to link results to the underlying geology and/or hydrogeology. Specific goals of this project are as follows: (1) Test ground based geophysical techniques for the efficacy in delineating underlying geology; (2) Use ground measurements to refine interpretations of AEM data; and (3) Improve the calibration and correlation of AEM information. The potential benefits of this project are as follows: (1) Develop a tool to map subsurface units at the Hanford Site in a rapid and cost effective manner; (2) Map groundwater pathways within the River Corridor; and (3) Aid development of the conceptual site model. If anomalies observed in the AEM data can be correlated with subsurface geology, then the rapid scanning and non-intrusive capabilities provided by the airborne surveys can be used at the Hanford Site to screen for areas that warrant further investigation.

PETERSEN SW

2010-12-02T23:59:59.000Z

328

An aerial radiological survey of the Tonopah Test Range including Clean Slate 1,2,3, Roller Coaster, decontamination area, Cactus Springs Ranch target areas. Central Nevada  

SciTech Connect

An aerial radiological survey was conducted of major sections of the Tonopah Test Range (TTR) in central Nevada from August through October 1993. The survey consisted of aerial measurements of both natural and man-made gamma radiation emanating from the terrestrial surface. The initial purpose of the survey was to locate depleted uranium (detecting {sup 238}U) from projectiles which had impacted on the TTR. The examination of areas near Cactus Springs Ranch (located near the western boundary of the TTR) and an animal burial area near the Double Track site were secondary objectives. When more widespread than expected {sup 241}Am contamination was found around the Clean Slates sites, the survey was expanded to cover the area surrounding the Clean Slates and also the Double Track site. Results are reported as radiation isopleths superimposed on aerial photographs of the area.

Proctor, A.E.; Hendricks, T.J.

1995-08-01T23:59:59.000Z

329

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA  

SciTech Connect

This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CAS 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.

BECHTEL NEVADA

2005-12-01T23:59:59.000Z

330

HISTORICAL AMERICAN ENGINEERING RECORD - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY, TEST AREA NORTH, HAER NO. ID-33-E  

SciTech Connect

Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to house the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of an international safety program for commercial power reactors. Other projects included NASA's Systems for Nuclear Auxiliary Power and storage of Three Mile Island meltdown debris. National missions for TAN in reactor research and safety research have expired; demolition of historic TAN buildings is underway.

Susan Stacy; Hollie K. Gilbert

2005-02-01T23:59:59.000Z

331

Characterization ReportOperational Closure Covers for the Area 5 Radioactive Waste Management Site at the Nevada Test Site  

SciTech Connect

Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS) for the U.S. Department of Energy (DOE) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Area 3 RWMS is located in south-central Yucca Flat and the Area 5 RWMS is located about 15 miles south, in north-central Frenchman Flat. Though located in two separate topographically closed basins, they are similar in climate and hydrogeologic setting. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste, while the Area 3 RWMS uses subsidence craters formed from underground testing of nuclear weapons for the disposal of packaged and unpackaged bulk waste. Over the next several decades, most waste disposal units at both the Area 3 and Area 5 RWMSs are anticipated to be closed. Closure of the Area 3 and Area 5 RWMSs will proceed through three phases: operational closure, final closure, and institutional control. Many waste disposal units at the Area 5RWMS are operationally closed and final closure has been placed on one unit at the Area 3 RWMS (U-3ax/bl). Because of the similarities between the two sites (e.g., type of wastes, environmental factors, operational closure cover designs, etc.), many characterization studies and data collected at the Area 3 RWMS are relevant and applicable to the Area 5 RWMS. For this reason, data and closure strategies from the Area 3 RWMS are referred to as applicable. This document is an interim Characterization Report Operational Closure Covers, for the Area 5 RWMS. The report briefly describes the Area 5 RWMS and the physical environment where it is located, identifies the regulatory requirements, reviews the approach and schedule for closing, summarizes the monitoring programs, summarizes characterization studies and results, and then presents conclusions and recommendations.

Bechtel Nevada Geotechnical Sciences

2005-06-01T23:59:59.000Z

332

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

333

Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.

NSTec Environmental Restoration

2008-04-01T23:59:59.000Z

334

Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536 Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure

NSTec Environmental Restoration

2007-06-01T23:59:59.000Z

335

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 425: Area 9 Main Lake Construction Debris Disposal Area, Tonopah Test Range, Nevada  

DOE Green Energy (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure of Corrective Action Unit (CAU) 425, Area 9 Main Lake Construction Debris Disposal Area. This CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996). This site will be cleaned up under the SAFER process since the volume of waste exceeds the 23 cubic meters (m{sup 3}) (30 cubic yards [yd{sup 3}]) limit established for housekeeping sites. CAU 425 is located on the Tonopah Test Range (TTR) and consists of one Corrective Action Site (CAS) 09-08-001-TA09, Construction Debris Disposal Area (Figure 1). CAS 09-08-001-TA09 is an area that was used to collect debris from various projects in and around Area 9. The site is located approximately 81 meters (m) (265 feet [ft]) north of Edwards Freeway northeast of Main Lake on the TTR. The site is composed of concrete slabs with metal infrastructure, metal rebar, wooden telephone poles, and concrete rubble from the Hard Target and early Tornado Rocket sled tests. Other items such as wood scraps, plastic pipes, soil, and miscellaneous nonhazardous items have also been identified in the debris pile. It is estimated that this site contains approximately 2280 m{sup 3} (3000 yd{sup 3}) of construction-related debris.

K. B. Campbell

2002-04-01T23:59:59.000Z

336

Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 214 is located in Areas 5, 11, and 25 of the Nevada Test Site (NTS). CAU 214 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as ''Corrective Action Unit 214: Bunkers and Storage Areas,'' and is comprised of nine Corrective Action Sites (CASs): {sm_bullet} CAS 05-99-01, Fallout Shelters {sm_bullet} CAS 11-22-03, Drum {sm_bullet} CAS 25-23-01, Contaminated Materials {sm_bullet} CAS 25-23-19, Radioactive Material Storage {sm_bullet} CAS 25-34-03, Motor Dr/Gr Assembly (Bunker) {sm_bullet} CAS 25-34-04, Motor Dr/Gr Assembly (Bunker) {sm_bullet} CAS 25-34-05, Motor Dr/Gr Assembly (Bunker) {sm_bullet} CAS 25-99-12, Fly Ash Storage {sm_bullet} CAS 25-99-18, Storage Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 11-22-03, 25-34-03, 25-34-04, 25-34-05, 25-99-12, and 25-99-18 is No Further Action. Closure activities included: {sm_bullet} Removing and disposing of the fly ash and surrounding wooden structure at CAS 25-99-12 as a best management practice The NDEP-approved corrective action alternative for CAS 05-99-01 in CAU 214 is Clean Closure. Closure activities included: {sm_bullet} Removing and disposing of soil contaminated with the pesticide dieldrin The NDEP-approved corrective action alternative for CASs 25-23-01 and 25-23-19 is Closure in Place with Administrative Controls. Closure activities included: {sm_bullet} Removing and disposing of soil contaminated with chromium and soil impacted with the pesticides chlordane and heptachlor {sm_bullet} Implementing use restrictions (UR) at both CASs as detailed in the CAU 214 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005) {sm_bullet} Posting UR warning signs around CASs 25-23-01 and 25-23-19 on the existing chain link fence

NSTec Environmental Restoration

2006-09-01T23:59:59.000Z

337

Annual Waste Minimization Summary Report Calendar Year 2007  

SciTech Connect

This report summarizes the waste minimization efforts undertaken by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year (CY) 2007. This report was developed in accordance with the requirements of the Nevada Test Site (NTS) Resource Conservation and Recovery Act (RCRA) Permit (number NEV HW0021), and as clarified in a letter dated April 21, 1995, from Paul Liebendorfer of the Nevada Division of Environmental Protection to Donald Elle of the U.S. Department of Energy, Nevada Operations Office. The NNSA/NSO Pollution Prevention (P2) Program establishes a process to reduce the volume and toxicity of waste generated by the NNSA/NSO and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment. The following information provides an overview of the P2 Program, major P2 accomplishments during the reporting year, a comparison of the current year waste generation to prior years, and a description of efforts undertaken during the year to reduce the volume and toxicity of waste generated by the NNSA/NSO.

NSTec Environmental Management

2008-02-01T23:59:59.000Z

338

300-Area VOC Program Slug Test Characterization Results for Selected Test/Depth Intervals Conducted During the Drilling of Well 399-3-21  

SciTech Connect

This report presents brief test descriptions and analysis results for multiple, stress-level slug tests that were performed at selected test/depth intervals within well 399-3-21 as part of the 300-Area volatile organic compound characterization program. The test intervals were characterized as the borehole was advanced to its final drill depth (45.7 m) and before its completion as a monitor-well facility. The primary objective of the slug tests was to provide information pertaining to the vertical distribution of hydraulic conductivity with depth at this location and to select the final screen-depth interval for the monitor well. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor-well strategies within this area.

Spane, Frank A.

2007-07-19T23:59:59.000Z

339

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 8, 2005 March 8, 2005 Audit Report: OAS-M-05-03 Management Controls over Alternative Financing for Office and Support Facilities at Y-12 February 22, 2005 Inspection Report: IG-0677 Security and Other Issues Related to Out-Processing of Employees at Los Alamos National Laboratory February 18, 2005 Audit Report: OAS-L-05-03 Audit of the Office of Science Security Procedures February 14, 2005 Audit Report: OAS-M-05-02 Management Controls over Western Area Power Administration's Central Valley Project Transmission Services February 14, 2005 Audit Report: IG-0676 Department of Energy Contractor Home Office Expenses February 11, 2005 Inspection Report: IG-0674 Unauthorized Handguns on the Nevada Test Site February 11, 2005 Audit Report: IG-0675 The Department's Federal Purchase Card Program at Headquarters

340

Calendar Year 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 26, 2012 October 26, 2012 Special Report: IG-0875 Review of the Compromise of Security Test Materials at the Y-12 National Security Complex October 22, 2012 Audit Report: IG-0873 Management of Western Area Power Administration's Cyber Security Program October 19, 2012 Special Report: IG-0874 Management Challenges at the Department of Energy - Fiscal Year 2013 October 17, 2012 Examination Report: OAS-RA-13-03 Community Action Partnership of Orange County - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 October 16, 2012 Management Alert: IG-0872 The Department of Energy's Management of Foreign Travel October 9, 2012 Examination Report: OAS-RA-13-02 County of Los Angeles - Energy Efficiency and Conservation Block Grant

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1  

Science Conference Proceedings (OSTI)

An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'''groundwater modeling, and radiochemistry. The peer review team was tasked with addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studiesthe next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted for uncertainty in models of flow and transport in the Frenchman Flat except for a few deficiencies described in the report. Finally, the peer review team concludes that the UGTA subproject has explored a wide range of variations in assumptions, methods, and data, and should proceed to the next stage with an emphasis on monitoring studies. The corrective action strategy, as described in the Federal Facility Agreement and Consent Order, states that the groundwater flow and transport models for each corrective action unit will consider, at a minimum, the following: Alternative hydrostratigraphic framework models of the modeling domain. Uncertainty in the radiological and hydrological source terms. Alternative models of recharge. Alternative boundary conditions and groundwater flows. Multiple permissive sets of calibrated flow models. Probabilistic simulations of transport using plausible sets of alternative framework and recharge models, and boundary and groundwater flows from calibrated flow models. Ensembles of forecasts of contaminant boundaries. Sensitivity and uncertainty analyses of model outputs. The peer review team finds that these minimum requirements have been met. While the groundwater modeling and uncertainty analyses have been quite detailed, the peer review team has identified several modeling-related issues that should be addressed in the next phase of the corrective action activities: Evaluating and using water-level gradients from the pilot wells at the Area 5 Radioactive Waste Management Site in model calibration. Re-evaluating the use of geochemical age-dating data to constrain model calibrations. Developing water budgets for the alluvial and upper volcanic aquifer systems in Frenchman Flat. Considering modeling approaches in which calculated groundwater flow directions near the water table are not predetermined by model boundary conditions and areas of recharge, all of which are very uncertain. Evaluating local-scale variations in hydraulic conductivity on the calculated contaminant boundaries. Evaluat

Sam Marutzky

2010-09-01T23:59:59.000Z

342

Emission Testing of Washington Metropolitan Area Transit Authority (WMATA) Natural Gas and Diesel Transit Buses  

DOE Green Energy (OSTI)

An evaluation of emissions of natural gas and diesel buses operated by the Washington Metro Area Transit Authority.

Melendez, M.; Taylor, J.; Wayne, W. S.; Smith, D.; Zuboy, J.

2005-12-01T23:59:59.000Z

343

Closure Report for Corrective Action Unit 300: Surface Release Areas Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 300 is located in Areas 23, 25, and 26 of the Nevada Test Site, which is located approximately 65 miles northwest of Las Vegas, Nevada. CAU 300 is listed in the Federal Facility Agreement and Consent Order of 1996 as Surface Release Areas and is comprised of the following seven Corrective Action Sites (CASs), which are associated with the identified Building (Bldg): {sm_bullet} CAS 23-21-03, Bldg 750 Surface Discharge {sm_bullet} CAS 23-25-02, Bldg 750 Outfall {sm_bullet} CAS 23-25-03, Bldg 751 Outfall {sm_bullet} CAS 25-60-01, Bldg 3113A Outfall {sm_bullet} CAS 25-60-02, Bldg 3901 Outfall {sm_bullet} CAS 25-62-01, Bldg 3124 Contaminated Soil {sm_bullet} CAS 26-60-01, Bldg 2105 Outfall and Decon Pad The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 23-21-03, 23-25-02, and 23-25-03 is no further action. As a best management practice, approximately 48 feet of metal piping was removed from CAS 23-25-02 and disposed of as sanitary waste. The NDEP-approved corrective action alternative for CASs 25-60-01, 25-60-02, 25-62-01, and 26-60-01, is clean closure. Closure activities for these CASs included removing and disposing of soil impacted with total petroleum hydrocarbons-diesel range organics (TPH-DRO), polychlorinated biphenyls (PCBs), semivolatile organic compounds (SVOCs), and cesium (Cs)-137, concrete impacted with TPH-DRO, and associated piping impacted with TPH-DRO. CAU 300 was closed in accordance with the NDEP-approved CAU 300 Corrective Action Plan (CAP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006). The closure activities specified in the CAP were based on the recommendations presented in the CAU 300 Corrective Action Decision Document (NNSA/NSO, 2005). This Closure Report documents CAU 300 closure activities. During closure activities, approximately 40 cubic yards (yd3) of low-level waste consisting of TPH-DRO-, PCB-, and Cs-137-impacted soil and debris, approximately 7 yd3 of hydrocarbon waste consisting of TPH-DRO-impacted soil, and approximately 66 yd3 of sanitary debris consisting of soil and concrete debris were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of field screening and laboratory analysis to determine the extent of excavation required, were employed during the performance of closure work.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

344

Weldon Spring Site Environmental Report for calendar year 1994  

SciTech Connect

This report for Calendar Year 1994 has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project (WSSRAP). The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The chemical plant, raffinate pits, and quarry are located on Missouri State Route 94, southwest of US Route 40/61. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site, estimates of effluent releases, and trends in groundwater contaminant levels. Additionally, applicable compliance requirements, quality assurance programs, and special studies conducted in 1994 to support environmental protection programs are discussed. Dose estimates presented in this report are based on hypothetical exposure scenarios of public use of areas near the site. In addition, release estimates have been calculated on the basis of 1994 National Pollutant Discharge Elimination System (NPDES) and air monitoring data. Effluent discharges from the site under routine NPDES and National Emission Standards for Hazardous Air Pollutants (NESHAPS) monitoring were below permitted levels.

NONE

1995-05-01T23:59:59.000Z

345

Explanation of Significant Differences for the Record of Decision for the Test Area North Operable Unit 1-10  

SciTech Connect

This Explanation of Significant Differences (ESD) applies to the remedial actions performed under the Final Record of Decision for Test Area North, Operable Unit 1-1 0, Idaho National Engineering and Environmental Laboratory (DOE-ID 1999) as amended by the Explanation of Significant Differences for the Record of Decision for the Test Area North Operable Unit 1-10 (DOE-ID 2003), the Record of Decision Amendment for the V-Tanks (TSF-09 and TSF-18) and Explanation of Significant Differences for the PM-2A Tanks (TSF-26) and TSF-06, Area IO, at Test Area North, Operable Unit 1-1 0 (DOE-ID 2004a), and the Explanation of Significant Differences for the Record of Decision for the Test Area North Operable Unit 1-10 (DOE-ID 2005). The U.S. Department of Energy (DOE) Idaho Operations Office; U.S. Environmental Protection Agency (EPA), Region 10; and the Idaho Department of Health and Welfare-now identified as the Idaho Department of Environmental Quality (DEQ)-signed the Record of Decision (ROD) in December 1999, the 2003 ESD in April 2003, the ROD Amendment/ESD in February 2004, and the 2005 ESD in January 2005. The EPA and DEQ support the need for this ESD.

D. L. Eaton

2007-01-18T23:59:59.000Z

346

Focused evaluation of selected remedial alternatives for the underground test area  

SciTech Connect

The Nevada Test Site (NTS), located in Nye County in southern Nevada, was the location of 928 nuclear tests conducted between 1951 and 1992. Of the total tests, 824 were nuclear tests performed underground. This report describes the approach taken to determine whether any specific, proven, cost-effective technologies currently exist to aid in the removal of the radioactive contaminants from the groundwater, in the stabilization of these contaminants, and in the removal of the source of the contaminants.

NONE

1997-04-01T23:59:59.000Z

347

Underground Test Area Subproject Phase I Data Analysis Task. Volume V - Transport Parameter and Source Term Data Documentation Package  

Science Conference Proceedings (OSTI)

Volume V of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the transport parameter and source term data. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.

None

1996-12-01T23:59:59.000Z

348

Closure Report for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box Nevada Test Site, Nevada  

SciTech Connect

This Closure Report (CR) describes the remediation activities performed and the results of verification sampling conducted at Corrective Action Unit (CAU) 230, Area 22 Sewage Lagoons and CAU 320, Area 22 Desert Rock Airport Strainer Box. The CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996). The CAU is located in Area 22 of the Nevada Test Site (NTS) (Figure 1) and consists of the following Corrective Action Sites (CASs): 22-03-01- Sewage Lagoon (CAU 230); and 22-99-01- Strainer Box (CAU 320). Included with CAS 22-99-01 is a buried Imhoff tank and a sludge bed. These CAUs will be collectively referred to in this plan as the Area 22 Sewage Lagoons site. Site characterization activities were done during September 1999. Characterization of the manholes associated with the septic system leading to the Imhoff tank was done during March 2000. The results of the characterization presented in the Corrective Action Decision Document (CADD) indicated that only the sludge bed (CAS 22-99-01) contained constituents of concern (COC) above action levels and required remediation (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 2000a).

D. S. Tobiason

2001-07-01T23:59:59.000Z

349

Final Report - Hydraulic Conductivity with Depth for Underground Test Area (UGTA) Wells  

SciTech Connect

Hydraulic conductivity with depth has been calculated for Underground Test Area (UGTA) wells in volcanic tuff and carbonate rock. The following wells in volcanic tuff are evaluated: ER-EC-1, ER-EC-2a, ER-EC-4, ER-EC-5, ER-5-4#2, ER-EC-6, ER-EC-7, and ER-EC-8. The following wells in carbonate rock are evaluated: ER-7-1, ER-6-1, ER-6-1#2, and ER-12-3. There are a sufficient number of wells in volcanic tuff and carbonate rock to associate the conductivity values with the specific hydrogeologic characteristics such as the stratigraphic unit, hydrostratigraphic unit, hydrogeologic unit, lithologic modifier, and alteration modifier used to describe the hydrogeologic setting. Associating hydraulic conductivity with hydrogeologic characteristics allows an evaluation of the data range and the statistical distribution of values. These results are relevant to how these units are considered in conceptual models and represented in groundwater models. The wells in volcanic tuff illustrate a wide range of data values and data distributions when associated with specific hydrogeologic characteristics. Hydraulic conductivity data within a hydrogeologic characteristic can display normal distributions, lognormal distributions, semi-uniform distribution, or no identifiable distribution. There can be multiple types of distributions within a hydrogeologic characteristic such as a single stratigraphic unit. This finding has implications for assigning summary hydrogeologic characteristics to hydrostratigraphic and hydrogeologic units. The results presented herein are specific to the hydrogeologic characteristic and to the wells used to describe hydraulic conductivity. The wells in carbonate rock are associated with a fewer number of hydrogeologic characteristics. That is, UGTA wells constructed in carbonate rock have tended to be in similar hydrogeologic materials, and show a wide range in hydraulic conductivity values and data distributions. Associations of hydraulic conductivity and hydrogeologic characteristics are graphically presented even when there are only a few data. This approach benchmarks what is currently known about the association of depth-specific hydraulic conductivity and hydrogeologic characteristics.

P. Oberlander; D. McGraw; C. Russell

2007-10-31T23:59:59.000Z

350

2004 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada  

SciTech Connect

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (Bechtel Nevada, 2000) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs) for each of the facilities, and reports the results in an annual summary report to the U.S. Department of Energy Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (U.S. Department of Energy [DOE]). The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office performed annual reviews in fiscal year (FY) 2004 by evaluating operational factors and research results that impact the continuing validity of the PA and CA results. This annual summary report presents data and conclusions from the FY 2004 review, and determines the adequacy of the PAs and CAs. Operational factors, such as the waste form and containers, facility design, waste receipts, closure plans, as well as monitoring results and research and development (R&D) activities were reviewed in FY 2004 for the determination of the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed for the determination of the adequacy of the CAs.

Vefa Yucel

2005-01-01T23:59:59.000Z

351

Computer-aided engineering annual report for calendar year 1989  

Science Conference Proceedings (OSTI)

During calendar year 1989, EG G Idaho completed the initial procurement and implementation of a major new Computer-Aided Engineering (CAE) system. Seventy new workstations and associated engineering applications were installed over 100 personal computers (PCs) were integrated into the environment, and communications links to the IBM mainframes and the Cray supercomputer were established. The system achieves integration through sophisticated data communications and application interfaces that allow data sharing across the entire environment. Applications available on the system facilitate engineering relate to full three-dimensional (3-D) piping, heating/ventilating/air conditioning (HAVC), structural and steel design, solids modeling and analysis, desktop publishing, design and drafting, and include automated links to various analysis codes on the Cray supercomputer. The system also provides commonly used engineering tools such as spreadsheets, language compilers, terminal emulation, and file transfer facilities. Although difficult to quantify, recent information has shown that projected annual productivity improvement to the Idaho National Engineering Laboratory (INEL) will be in excess of $2,000,000. This improvement will be generated in a variety of areas including improvement in the efficiency of individual users, checkplot production, data management, file transfers, plotting. design-analysis interfaces, and the benefit of full 3-D design. Current plans call for a significant expansion of the CAE system in 1990 with continued expansion through 1993. Additional workstations, system software and utilities, networking facilities and applications software will be procured and implemented. More than one hundred people will receive training on the various application packages during 1990. Efforts to extend networking throughout the INEL will be continued. 2 refs.

Brockelsby, H.C. Jr.

1990-03-01T23:59:59.000Z

352

Annual Site Environmental Report Calendar Year 2007  

Science Conference Proceedings (OSTI)

This report summarizes the environmental status of Ames Laboratory for calendar year 2007. It includes descriptions of the Laboratory site, its mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames Laboratory is located on the campus of Iowa State University (ISU) and occupies 11 buildings owned by the Department of Energy (DOE). See the Laboratory's Web page at www.external.ameslab.gov for locations and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2007, the Laboratory accumulated and disposed of waste under U.S. Environmental Protection Agency (EPA) issued generator numbers. All waste is handled according to all applicable EPA, State, Local and DOE Orders. In 2006 the Laboratory reduced its generator status from a Large Quantity Generator (LQG) to a Small Quantity Generator (SQG). EPA Region VII was notified of this change. The Laboratory's RCRA hazardous waste management program was inspected by EPA Region VII in April 2006. There were no notices of violations. The inspector was impressed with the improvements of the Laboratory's waste management program over the past ten years. The Laboratory was in compliance with all applicable federal, state, local and DOE regulations and orders in 2007. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2007. See U.S. Department of Energy Air Emissions Annual Report in Appendix B. As indicated in prior SERs, pollution awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2003. Included in these efforts were battery and CRT recycling, waste white paper and green computer paper-recycling. Ames Laboratory also recycles/reuses salvageable metal, used oil, styrofoam peanuts, batteries, fluorescent lamps and telephone books. Ames Laboratory reported to DOE-Ames Site Office (AMSO), through the Laboratory's Self Assessment Report, on its Affirmative Procurement Performance Measure. A performance level of 'A' was achieved in 2007 for Integrated Safety, Health, and Environmental Protection. As reported in Site Environmental Reports for prior years, the Laboratory's Environmental Management System has been integrated into the Laboratory's Integrated Safety Management System since 2005. The integration of EMS into the way the Laboratory does business allows the Laboratory to systematically review, address and respond to the Laboratory's environmental impacts.

Dan Kayser-Ames Laboratory

2007-12-31T23:59:59.000Z

353

ERRATA SHEET for Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada  

SciTech Connect

Section 2.1.1.3 of the Table of Contents reference on Page v and on Page 12 of the Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada erroneously refers to the Nevada Environmental Policy Act Determination. The correct title of the referenced document is the National Environmental Policy Act Determination.

K. B. Campbell

2002-04-01T23:59:59.000Z

354

Botts Area-Preserving Flux-Form Advection Algorithm: Extension to Higher Orders and Additional Tests  

Science Conference Proceedings (OSTI)

Botts forward-in-time, positive-definite, area-preserving flux-form advection algorithm is extended to higher orders. The new algorithm versions are tested with two-dimensional flow fields: a purely rotational flow and a purely deformational ...

Alexandre A. Costa; Anto?nio JosC. Sampaio

1997-08-01T23:59:59.000Z

355

Corrective action plan for corrective action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The Mercury Fire Training Pit is a former fire training area located in Area 23 of the Nevada Test Site (NTS). The Mercury Fire Training Pit was used from approximately 1965 to the early 1990s to train fire-fighting personnel at the NTS, and encompasses an area approximately 107 meters (m) (350 feet [ft]) by 137 m (450 ft). The Mercury Fire Training Pit formerly included a bermed burn pit with four small burn tanks, four large above ground storage tanks an overturned bus, a telephone pole storage area, and areas for burning sheds, pallets, and cables. Closure activities will include excavation of the impacted soil in the aboveground storage tank and burn pit areas to a depth of 1.5 m (5 ft), and excavation of the impacted surface soil downgradient of the former ASTs and burnpit areas to a depth of 0.3 m (1 ft). Excavated soil will be disposed in the Area 6 Hydrocarbon Landfill at the NTS.

Nacht, S.

1999-08-01T23:59:59.000Z

356

Closure Report for Corrective Action Unit 254: Area 25, R-MAD Decontamination Facility, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

Corrective Action Unit (CAU) 254 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles) northwest of Las Vegas, Nevada. The site is located within the Reactor Maintenance, Assembly and Disassembly (R-MAD) compound and consists of Building 3126, two outdoor decontamination pads, and surrounding areas within an existing fenced area measuring approximately 50 x 37 meters (160 x 120 feet). The site was used from the early 1960s to the early 1970s as part of the Nuclear Rocket Development Station program to decontaminate test-car hardware and tooling. The site was reactivated in the early 1980s to decontaminate a radiologically contaminated military tank. This Closure Report (CR) describes the closure activities performed to allow un-restricted release of the R-MAD Decontamination Facility.

G. N. Doyle

2002-02-01T23:59:59.000Z

357

Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.

Patrick Matthews

2010-03-01T23:59:59.000Z

358

Test Reference Year Generation and Evaluation Methods in the Continental Mediterranean Area  

Science Conference Proceedings (OSTI)

Different meteorological data series called multiyear data, long-term average measured data series, or test reference years (TRYs) are required for solar energy system simulation. It is known that the use of the multiyear data approach requires a ...

Julia Bilbao; Argimiro Miguel; JosA. Franco; Arturo Ayuso

2004-02-01T23:59:59.000Z

359

Testing for a time-varying price-cost markup in the Euro area inflation process  

E-Print Network (OSTI)

2004). In?ation and relative price variability: short-runand the informativeness of prices. Journal of Money, CreditTesting for a time-varying price-cost markup in the Euro

Bowdler, Christopher; Jansen, Eilev S.

2004-01-01T23:59:59.000Z

360

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at diversity@hq.doe.gov to let us know about other upcoming events. To learn more about the Department's diversity initiatives, visit this page. June 2013 Sun Mon Tue Wed Thu Fri Sat 26 27 28 29 30 31 1 LGBT Pride Month 3:30PM to 5:30PM EDT » National Caribbean American Heritage Month 3:30PM to 5:00PM EDT » Black Music Month 3:30PM to 5:30PM EDT » 2 3 4 5 6 7 8 « LGBT Pride Month 3:30PM to 5:30PM EDT » « National Caribbean American Heritage Month 3:30PM to 5:00PM EDT » « Black Music Month 3:30PM to 5:30PM EDT

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at diversity@hq.doe.gov to let us know about other upcoming events. To learn more about the Department's diversity initiatives, visit this page. December 2013 Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 Universal Human Rights Month 4:15PM to 3:15PM EST » 8 9 10 11 12 13 14 « Universal Human Rights Month 4:15PM to 3:15PM EST » Human Rights Day 4:15PM EST 15 16 17 18 19 20 21 « Universal Human Rights Month 4:15PM to 3:15PM EST » 22 23 24 25 26 27 28 « Universal Human Rights Month 4:15PM to 3:15PM EST

362

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at diversity@hq.doe.gov to let us know about other upcoming events. To learn more about the Department's diversity initiatives, visit this page. August 2013 Sun Mon Tue Wed Thu Fri Sat 28 29 30 31 1 2 3 « American Veterans 69th Annual National Convention 3:30PM to 4:30PM EDT » 4 5 6 7 8 9 10 « American Veterans 69th Annual National Convention 3:30PM to 4:30PM EDT 11 12 13 14 15 16 17 International Youth Day 3:30PM EDT 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Women's Equality Day 3:30PM EDT International Association of Latino Public Administration Executives Executive Leadership Forum 3:30PM to 4:45PM EDT

363

Diversity and Inclusion Events Calendar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Diversity and Inclusion Events Calendar Training, networking, and career-building conferences like the ones below are valuable ways to engage in diversity issues. Learn about upcoming events on the calendar below, and contact us at diversity@hq.doe.gov to let us know about other upcoming events. To learn more about the Department's diversity initiatives, visit this page. December 2012 Sun Mon Tue Wed Thu Fri Sat 25 26 27 28 29 30 1 « Mickey Leland Energy Fellowship 11:45AM to 6:45PM EST » 2 3 4 5 6 7 8 « Mickey Leland Energy Fellowship 11:45AM to 6:45PM EST » 9 10 11 12 13 14 15 « Mickey Leland Energy Fellowship 11:45AM to 6:45PM EST » 16 17 18 19 20 21 22 « Mickey Leland Energy Fellowship 11:45AM to 6:45PM EST » 23 24

364

Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: 25-23-22, Contaminated Soils Site 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Corrective Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.

Patrick Matthews

2010-03-01T23:59:59.000Z

365

Gas Permeation Testing Results from the Mixed Waste Focus Area Improved Hydrogen Getter Program  

Science Conference Proceedings (OSTI)

The gas permeabilities of more than 20 polymers were measured using pure and mixed gas techniques. The motivation was to determine potential materials that could be used to protect hydrogen getter particles from poisons while permitting sufficient hydrogen rates to enable the getters use in TRUPACT types of containers. A rate of five barrers or larger is needed. Of the materials screened in the pure gas tests, more than 15 qualified. Nine materials qualified in the mixed gas tests, but of the nine only three had high CCl4 rejection rates and four others would greatly reduce the transport of the CCl4.

Mark Stone; Christopher Orme; Eric Peterson; Michael Benson; John Kaszuba; Eugene Mroz; Marc Haga

2005-02-01T23:59:59.000Z

366

Radiation shielding tests in the Meson beamline in the master substation area  

SciTech Connect

A review of shielding uncovered a weak region in a portion of the proton beam transport to the Meson Area. Preliminary CASIM Monte Carlo studies indicated dose rates at the surface under abnormal operating conditions would be above the Fermilab Radiation Guide limits. Measurements made on December 15 and 16 confirmed this concern. Further comparisons of data with CASIM predictions are discussed. 5 refs., 22 figs., 8 tabs.

Coleman, R.; Kissel, W.; Leveling, A.; Moore, C.D.; Vylet, V.

1991-04-01T23:59:59.000Z

367

The Underground Test Area Project of the Nevada Test Site: Building Confidence in Groundwater Flow and Transport Models at Pahute Mesa Through Focused Characterization Studies  

SciTech Connect

Pahute Mesa at the Nevada Test Site contains about 8.0E+07 curies of radioactivity caused by underground nuclear testing. The Underground Test Area Subproject has entered Phase II of data acquisition, analysis, and modeling to determine the risk to receptors from radioactivity in the groundwater, establish a groundwater monitoring network, and provide regulatory closure. Evaluation of radionuclide contamination at Pahute Mesa is particularly difficult due to the complex stratigraphy and structure caused by multiple calderas in the Southwestern Nevada Volcanic Field and overprinting of Basin and Range faulting. Included in overall Phase II goals is the need to reduce the uncertainty and improve confidence in modeling results. New characterization efforts are underway, and results from the first year of a three-year well drilling plan are presented.

Pawloski, G A; Wurtz, J; Drellack, S L

2009-12-29T23:59:59.000Z

368

Addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.

Krauss, Mark J.

2013-10-01T23:59:59.000Z

369

Environmental Science and Research Foundation annual technical report: Calendar year 1996  

SciTech Connect

This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The authors conduct an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provide environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research in the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. The major accomplishments of the Foundation and its University Affiliates during the calendar year 1996 are discussed.

Morris, R.C.; Blew, R.D. [eds.

1997-07-01T23:59:59.000Z

370

Addendum to the Closure Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The following is an addendum to the 'Closure Report for Corrective Action Unit 92: Area 6 Decontamination Pond, Nevada Test Site, Nevada', DOE/NV/11718--306, dated April 1999. This addendum includes Use Restriction Information forms and survey maps for CAS 06-04-01, Decon Pad Oil/Water Separator, and CAS 06-05-02, Decontamination Pond (RCRA), that were inadvertently left out of the Closure Report when it was published as a final document.

NSTec Environmental Restoration

2007-06-01T23:59:59.000Z

371

Numerical Simulation and Test Study on Non-uniform Area Of Round-ended CFST Tubular Tower  

Science Conference Proceedings (OSTI)

The impacts of Poisson ratio of core concrete on the bearing capacity of round-ended CFST tubular tower and non-uniform area were analyzed with test study and the sub-model technology, the most disadvantaged stress state of the structure under the triaxial ... Keywords: round-ended concrete-filled steel(CFST), triaxial compression, Poisson's ratio(), sub-model method, Micro-expansive

Jian-xiong Xie; Zhe-an Lu

2010-06-01T23:59:59.000Z

372

Density logging and density of rocks in Rainier Mesa Area, Nevada Test Site  

SciTech Connect

Density logs from all 35 vertical drill holes in the Rainier Mesa area in which logs were obtained were evaluated and the distribution of densities of units in the geologic section was derived. Densities were obtained in only 10 holes in which calibrated logging tools had been run. The logs from an additional 10 holes were calibrated with core. Densities vary from nearly 1 g/cc in tunnel bed 5 to over 2.8 g/cc in the dolomitic rocks. Log densities were found to agree well with core data in those subunits (chiefly within tunnel beds 3 and 4) where an adequate number of core measurements were available for comparison. Lithologic correlations based on density log signatures were found to extend for more than 8 km in several units and subunits in the area. Although the volcanic rocks in the Rainier Mesa area are comprised of a wider spectrum of minerals than the petroliferous rocks generally involved in most commercial logging applications, grain density may be estimated with good accuracy with only a knowledge of glass and zeolite content. The variability of the Z/A ratio of the matrix in these volcanic rocks is also negligible compared to the value of 0.5 generally assumed in density logging. However, due to the assumptions made concerning the Z/A of water in deriving the output of commercial density tools, one should be aware of the errors inherent in assuming that recorded log densities are true densities. These errors are normally small, being less than 3 percent for compensated limestone'' tools and 2 percent for tools which output electron density. 35 refs., 25 figs., 12 tabs.

Carroll, R.D.

1989-01-01T23:59:59.000Z

373

Corrective Action Investigation Plan for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO (1996), CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at the CAU 321 Area 22 Weather Station Fuel Storage, CAS 22-99-05 Fuel Storage Area. For purposes of this discussion, this site will be referred to as either CAU 321 or the Fuel Storage Area. The Fuel Storage Area is located in Area 22 of the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Fuel Storage Area (Figure 1-2) was used to store fuel and other petroleum products necessary for motorized operations at the historic Camp Desert Rock facility which was operational from 1951 to 1958 at the Nevada Test Site, Nevada. The site was dismantled after 1958 (DOE/NV, 1996a).

DOE /NV

1999-01-28T23:59:59.000Z

374

Housekeeping Closure Report for Corrective Action Unit 212: Area 23 Warehouses E and R Chemical Storage, Nevada Test Site, Nevada  

SciTech Connect

The Federal Facility Agreement and Consent Order was entered into by the State of Nevada; U.S. Department of Energy, and the U.S. Department of Defense to identify sites of potential historical contamination and implement corrective actions based on public health and environmental considerations. The facilities subject to this agreement include the Nevada Test Site (NTS), parts of the Tonopah Test Range, parts of the Nellis Air Force Range, the Central Nevada Test Area, and the Project Shoal Area. Corrective Action Sites (CASs) are areas potentially requiring corrective actions and may include solid waste management units, individual disposal, or release sites. Based on geography, technical similarity, agency responsibility, or other appropriate reasons, CASs are grouped together into corrective Action Units (CAUs) for the purposes of determining corrective actions. This report contains the Closure Verification Forms for cleanup activities that were performed at six CASs within CAU 212 on the NTS. The form for each CAS provides the location, directions to the site, general description, and photographs of the site before and after cleanup activities. Housekeeping activities at these sites included removal of debris, drums, batteries, scrap metal, and other material. Based on these activities, no further action is required at these CASs.

USDOE/NV

1999-05-01T23:59:59.000Z

375

Uncertainty and Sensitivity of Contaminant Travel Times from the Upgradient Nevada Test Site to the Yucca Mountain Area  

Science Conference Proceedings (OSTI)

Yucca Mountain (YM), Nevada, has been proposed by the U.S. Department of Energy as the nations first permanent geologic repository for spent nuclear fuel and highlevel radioactive waste. In this study, the potential for groundwater advective pathways from underground nuclear testing areas on the Nevada Test Site (NTS) to intercept the subsurface of the proposed land withdrawal area for the repository is investigated. The timeframe for advective travel and its uncertainty for possible radionuclide movement along these flow pathways is estimated as a result of effective-porosity value uncertainty for the hydrogeologic units (HGUs) along the flow paths. Furthermore, sensitivity analysis is conducted to determine the most influential HGUs on the advective radionuclide travel times from the NTS to the YM area. Groundwater pathways are obtained using the particle tracking package MODPATH and flow results from the Death Valley regional groundwater flow system (DVRFS) model developed by the U.S. Geological Survey (USGS). Effectiveporosity values for HGUs along these pathways are one of several parameters that determine possible radionuclide travel times between the NTS and proposed YM withdrawal areas. Values and uncertainties of HGU porosities are quantified through evaluation of existing site effective-porosity data and expert professional judgment and are incorporated in the model through Monte Carlo simulations to estimate mean travel times and uncertainties. The simulations are based on two steady-state flow scenarios, the pre-pumping (the initial stress period of the DVRFS model), and the 1998 pumping (assuming steady-state conditions resulting from pumping in the last stress period of the DVRFS model) scenarios for the purpose of long-term prediction and monitoring. The pumping scenario accounts for groundwater withdrawal activities in the Amargosa Desert and other areas downgradient of YM. Considering each detonation in a clustered region around Pahute Mesa (in the NTS operational areas 18, 19, 20, and 30) under the water table as a particle, those particles from the saturated zone detonations were tracked forward using MODPATH to identify hydraulically downgradient groundwater discharge zones and to determine the particles from which detonations will intercept the proposed YM withdrawal area. Out of the 71 detonations in the saturated zone, the flowpaths from 23 of the 71 detonations will intercept the proposed YM withdrawal area under the pre-pumping scenario. For the 1998 pumping scenario, the flowpaths from 55 of the 71 detonations will intercept the proposed YM withdrawal area. Three different effective-porosity data sets compiled in support of regional models of groundwater flow and contaminant transport developed for the NTS and the proposed YM repository are used. The results illustrate that mean minimum travel time from underground nuclear testing areas on the NTS to the proposed YM repository area can vary from just over 700 to nearly 700,000 years, depending on the locations of the underground detonations, the pumping scenarios considered, and the effective-porosity value distributions used. Groundwater pumping scenarios are found to significantly impact minimum particle travel time from the NTS to the YM area by altering flowpath geometry. Pumping also attracts many more additional groundwater flowpaths from the NTS to the YM area. The sensitivity analysis further illustrates that for both the pre-pumping and 1998 pumping scenarios, the uncertainties in effective-porosity values for five of the 27 HGUs considered account for well over 90 percent of the effective-porosity-related travel time uncertainties for the flowpaths having the shortest mean travel times to YM.

J. Zhu; K. Pohlmann; J. Chapman; C. Russell; R.W.H. Carroll; D. Shafer

2009-09-10T23:59:59.000Z

376

TREATABILITY TEST REPORT FOR THE REMOVAL OF CHROMIUM FROM GROUNDWATER AT 100-D AREA USING ELECTROCOAGULATION  

SciTech Connect

The U.S. Department of Energy (DOE) has committed to accelerate cleanup of contaminated groundwater along the Columbia River. The current treatment approach was driven by a series of Interim Action Records of Decision (IAROD) issued in the mid-1990s. Part of the approach for acceleration involves increasing the rate of groundwater extraction for the chromium plume north of the 100-D Reactor and injecting the treated water in strategic locations to hydraulically direct contaminated groundwater toward the extraction wells. The current treatment system uses ion exchange for Cr(VI) removal, with off-site regeneration of the ion exchange resins. Higher flow rates will increase the cost and frequency of ion exchange resin regeneration; therefore, alternative technologies are being considered for treatment at high flow rates. One of these technologies, electrocoagulation (EC), was evaluated through a pilot-scale treatability test. The primary purpose of the treatability study was to determine the effectiveness of Cr(VI) removal and the robustness/implementability of an EC system. Secondary purposes of the study were to gather information about derivative wastes and to obtain data applicable to scaling the process from the treatability scale to full-scale. The treatability study work plan identified a performance objective and four operational objectives. The performance objective for the treatability study was to determine the efficiency (effectiveness) of hexavalent chromium removal from the groundwater, with a desired concentration of {le} 20 micrograms per liter ({micro}g/L) Cr(VI) in the effluent prior to re-injection. Influent and effluent total chromium and hexavalent chromium data were collected using a field test kit for multiple samples per week, and from off-site laboratory analysis of samples collected approximately monthly. These data met all data quality requirements. Two of three effluent chromium samples analyzed in the off-site (that is, fixed) laboratory met the performance objective during the continuous operational testing. Effluent hexavalent chromium analyzed by the field laboratory met the performance goal in over 90 percent of the samples. All effluent hexavalent chromium samples during the batch testing with high influent hexavalent chromium concentrations ({approx}2000 {micro}g/L) met the performance objective. Although the EC system was able to meet the performance goal, it must be noted that it was not uncommon for the system to be operated in recycle mode to achieve the performance goal. The EC unit was sometimes, but not always, capable of a single pass treatment efficiency high enough to meet the performance goal, and recycling water for multiple treatment passes was effective. An operational objective was to determine the volume and composition of the waste streams to enable proper waste designation. The toxicity characteristic leaching procedure (TCLP) concentrations, pH, and free liquids were determined for solid material from the EC electrodes (mechanically removed scale), the filter press, and the tank bottoms for the effluent and waste collector tanks. These data met all data quality requirements. All solid-phase secondary waste streams were found to be below the TCLP limits for the toxicity characteristic, and a pH value within the limits for the corrosivity characteristic. Out of three samples, two (one of scale from the EC unit and one from filter press solids) failed the free liquid (paint filter) test, which is one of the acceptability criteria for Hanford's Environmental Restoration Disposal Facility (ERDF). The solid-phase waste generation rate was about 0.65-gallon of solid waste per 100 gallons of water treated. It is concluded that the solid-phase secondary waste generated from this technology under the conditions at the test site will meet the toxicity and corrosivity criteria for disposal. It is also concluded that with engineering and/or operational improvements, a solid-phase secondary waste could be produced that would meet the free liquid disposal requirements. The second oper

PETERSEN SW

2009-09-24T23:59:59.000Z

377

Composite Analysis for the Area 5 Radioactive Waste Management Site at the Nevada Test Site, Nye County, Nevada  

SciTech Connect

This report summarizes the results of a Composite Analysis (CA) for the Area 5 Radioactive Waste Management Site (RWMS). The Area 5 RWMS is a US Department of Energy (DOE)-operated low-level radioactive waste (LLW) management site located in northern Frenchman Flat on the Nevada Test Site (NTS). The Area 5 RWMS has disposed of low-level radioactive waste in shallow unlined pits and trenches since 1960. Transuranic waste (TRU) and high-specific activity waste was disposed in Greater Confinement Disposal (GCD) boreholes from 1983 to 1989. The purpose of this CA is to determine if continuing operation of the Area 5 RWMS poses an acceptable or unacceptable risk to the public considering the total waste inventory and all other interacting sources of radioactive material in the vicinity. Continuing operation of the Area 5 RWMS will be considered acceptable if the total effective dose equivalent (TEDE) is less than 100 mrem in a year. If the TEDE exceeds 30 mrem in a year, a cost-benefit options analysis must be performed to determine if cost-effective management options exist to reduce the dose further. If the TEDE is found to be less than 30 mrem in a year, an analysis may be performed if warranted to determine if doses are as low as reasonably achievable (ALARA).

V. Yucel

2001-09-01T23:59:59.000Z

378

Corrective Action Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect

The purpose of this Corrective Action Plan is to provide the strategy and methodology to close the Area 25 Vehicle Washdown. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was performed during March 1999 at each CAS. Soil samples were collected at each CAS using a direct-push method. Soil samples were collected from the surface to depths of up to 2.7 m (9 ft) below ground surface. In addition, the gravel sump at CAS 25-07-02 (F and J Roads Pad) was sampled using a backhoe. Soil samples were collected from depths of 0 to 0.6 m (0 to 2 ft) below the gravel layer in the sump.

D. S. Tobiason

2000-05-01T23:59:59.000Z

379

Measuring the permeability of Eleana argillite from area 17, Nevada Test Site, using the transient method  

SciTech Connect

Using the transient method, we determine the permeability of high-quartz Eleana argillite from the Nevada Test Site as a function of effective pressure. By comparing calculated and observed pressure decay in the upstream reservoir, we have determined the permeability of intact and fractured specimens at effective pressures ranging from 1.0 to 24.0 MPa. Over this pressure range, Eleana argillite has a low permeability (10{sup -16} to 10{sup -19} cm{sup 2}) when intact and a higher permeability (10{sup -12} to 10{sup -17} cm{sup 2}) with one induced through-going fracture.

Lin, W.

1978-12-11T23:59:59.000Z

380

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

David A. Strand

2004-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

Robert F. Boehlecke

2004-06-01T23:59:59.000Z

382

Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. However, some leachfields may still receive liquids from runoff during storm events. Results from the 2000-2001 site characterization activities conducted by International Technology (IT) Corporation, Las Vegas Office are documented in the Corrective Action Investigation Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. This document is located in Appendix A of the Corrective Action Decision Document for CAU 262. Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. (DOE/NV, 2001).

K. B. Campbell

2002-06-01T23:59:59.000Z

383

Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect

U.S. Department of Energy (DOE) Order 435.1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities to be performed in maintaining the Performance Assessment (PA) and Composite Analysis (CA) for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). The Disposal Authorization Statement (DAS) for the continuing operations of a LLW facility at the DOE complex specifies the conditions for operations based on approval of a PA and CA, and requires the facility to implement a maintenance program to assure that these conditions will remain protective of the public health and the environment in the future. The goal of the maintenance program is to provide that assurance. The maintenance process is an iterative one in which changing conditions may result in a revision of PA and CA; the revised PA and CA may impose a different set of conditions for facility operation, closure, and postclosure. The maintenance process includes managing uncertainty, performing annual reviews, submitting annual summary reports to DOE Headquarters (DOE/HQ), carrying out special analyses, and revising the PAs and CAs, if necessary. Management of uncertainty is an essential component of the maintenance program because results of the original PAs and CAs are understood to be based on uncertain assumptions about the conceptual models; the mathematical models and parameters; and the future state of the lands, disposal facilities, and human activities. The annual reviews for the PAs include consideration of waste receipts, facility specific factors, results of monitoring, and results of research and development (R&D) activities. Likewise, results of ongoing R&D, changes in land-use planning, new information on known sources of residual radioactive materials, and identification of new sources may warrant an evaluation to determine the impacts on the conclusions of the CAs.

V. Yucel

2002-09-01T23:59:59.000Z

384

Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0  

SciTech Connect

This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

385

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

SciTech Connect

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

386

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 1997  

Science Conference Proceedings (OSTI)

The results of the 1997 environmental surveillance and monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. The purpose of this report is to provide the U.S. Department of Energy and the public with information on the level of radioactive and non-radioactive pollutants, if any, that are added to the environment as a result of PPPL's operations. During Calendar Year 1997, PPPL's Tokamak Fusion Test Reactor (TFTR) completed fifteen years of fusion experiments begun in 1982. Over the course of three and half years of deuterium-tritium (D-T) plasma experiments, PPPL set a world record of 10.7 million watts of controlled fusion power, more than 700 tritium shots pulsed into the reactor vessel generating more than 5.6 x 1020 neutron and 1.6 gigajoules of fusion energy and researchers studied plasma science experimental data, which included "enhanced reverse shear techniques." As TFTR was completing its historic operations, PPPL participated with the Oak Ridge National Laboratory, Columbia University, and the University of Washington (Seattle) in a collaboration effort to design the National Spherical Torus Experiment (NSTX). This next device, NSTX, is located in the former TFTR Hot Cell on D site, and it is designed to be a smaller and more economical torus fusion reactor. Construction of this device began in late 1997, and first plasma in scheduled for early 1999. For 1997, the U.S. Department of Energy in its Laboratory Appraisal report rated the overall performance of Princeton Plasma Physics Laboratory as "excellent." The report cited the Laboratory's consistently excellent scientific and technological achievements and its successful management practices, which included high marks for environmental management, employee health and safety, human resources administration, science education, and communications. Groundwater investigations continued under a voluntary agreement with the New Jersey Department of Environmental Protection. PPPL monitored the presence of non-radiological contaminants, mainly volatile organic compounds (components of degreasing solvents). Monitoring revealed the presence of low levels of volatile organic compounds in an adjacent area to PPPL. Also, PPPL's radiological monitoring program characterized the ambient, background levels of tritium in the environment and from the TFTR stack; the data are presented in this report.

Finley, V.L. and Levine, J.D.

1999-01-10T23:59:59.000Z

387

Microsoft Word - MARK YOUR CALENDARS_REV3.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MARK YOUR CALENDARS! MARK YOUR CALENDARS! The U.S. Department of Energy's (DOE) Transportation External Coordination Working Group (TEC) Meeting will be held September 20-22, 2004 The registration table will open at Noon on September 20 and remain open through September 22. Participation in Topic Group Sessions for topic group members only. Monday, September 20 - The Tribal Topic Group session will meet from 2:00 - 5:00 p.m. Tuesday, September 21 - Topic Groups sessions will be held as follows: - 8:00 a.m. - 12:00 Noon 180(c) Topic Group - 10:30 - 12:00 Noon Rail Topic Group - 1:30 - 5:30 p.m. Security Topic Group - 6:00 - 7:00 p.m. Welcome Reception Wednesday, September 22 - General Meeting will start at 8:30 a.m. and adjourn at 3:30 p.m.

388

Summary of Fire Protection Programs for Calendar Year 2007  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMMARY of SUMMARY of FIRE PROTECTION PROGRAMS for CALENDAR YEAR 2007 UNITED STATES DEPARTMENT OF ENERGY Office of Corporate Safety Analysis Office of Nuclear Safety Policy and Assistance February 2009 Fire Protection Summary for Calendar Year 2007 i ii i FOREWORD A key safety objective of the U. S. Department of Energy (DOE) is to minimize the potential for and consequences of fires at DOE facilities. Since May 1950, an annual Fire Protection Program Summary (Annual Summary) has been developed by DOE and its predecessor agencies, the Atomic Energy Commission and the Energy Research Development Administration, to provide a means for measuring how well DOE is meeting this objective and where improvements can be made. In 1999, the Annual Summary reporting process was automated to streamline data collection and

389

Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites. A CAU consists of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and criteria for conducting site investigation activities at CAU 232, Area 25 Sewage Lagoons. Corrective Action Unit 232 consists of CAS 25-03-01, Sewage Lagoon, located in Area 25 of the Nevada Test Site (NTS). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1) (DOE/NV, 1996a). The Area 25 Sewage Lagoons (Figure 1-2) (IT, 1999b) are located approximately 0.3 mi south of the Test Cell 'C' (TCC) Facility and were used for the discharge of sanitary effluent from the TCC facility. For purposes of this discussion, this site will be referred to as either CAU 232 or the sewage lagoons.

DOE /NV Operations Office

1999-05-01T23:59:59.000Z

390

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada  

SciTech Connect

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility.

NSTec Environmental Restoration

2011-09-29T23:59:59.000Z

391

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 25, 2003 September 25, 2003 Inspection Report: IG-0621 Firearms Internal Controls at the Lawrence Livermore National Laboratory September 25, 2003 Audit Report: OAS-L-03-22 Audit of Relocation of Administrative Personnel from A-Area to B-Area at the Savannah River Site September 22, 2003 Audit Report: OAS-L-03-21 Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program-2003" September 16, 2003 Inspection Report: IG-0619 The Security Afforded Selected Tritium Reservoir Shipments (U) September 16, 2003 Evaluation Report: IG-0620 The Department's Unclassified Cyber Security Program-2003 September 11, 2003 Audit Report: OAS-L-03-20 Audit of Procurement Administration at the Oak Ridge National Laboratory September 4, 2003 Audit Report: IG-0618

392

Hanford Site Environmental Report for Calendar Year 2005  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2005; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.; Morasch, Launa F.

2006-09-28T23:59:59.000Z

393

Hanford Site Environmental Report for Calendar Year 2004  

Science Conference Proceedings (OSTI)

This report, published annually since 1958, includes information and summary analytical data that (1) provide an overview of activities at the Hanford Site during calendar year 2003; (2) demonstrate the site's compliance with applicable federal, state, and local environmental laws and regulations, executive orders, and U.S. Department of Energy (DOE) policies and directives; (3) characterize Hanford Site environmental management performance; and (4) highlight significant environmental programs.

Poston, Ted M.; Hanf, Robert W.; Dirkes, Roger L.

2005-09-29T23:59:59.000Z

394

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada  

DOE Green Energy (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) plan addresses the activities necessary to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites. CAU 398, located in Area 25 of the Nevada Test Site, is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996), and consists of the following 13 Corrective Action Sites (CASs) (Figure 1): (1) CAS 25-44-01 , a fuel spill on soil that covers a concrete pad. The origins and use of the spill material are unknown, but the spill is suspected to be railroad bedding material. (2) CAS 25-44-02, a spill of liquid to the soil from leaking drums. (3) CAS 25-44-03, a spill of oil from two leaking drums onto a concrete pad and surrounding soil. (4) CAS 25-44-04, a spill from two tanks containing sulfuric acid and sodium hydroxide used for a water demineralization process. (5) CAS 25-25-02, a fuel or oil spill from leaking drums that were removed in 1992. (6) CAS 25-25-03, an oil spill adjacent to a tipped-over drum. The source of the drum is not listed, although it is noted that the drum was removed in 1991. (7) CAS 25-25-04, an area on the north side of the Engine-Maintenance, Assembly, and Disassembly (E-MAD) facility, where oils and cooling fluids from metal machining operations were poured directly onto the ground. (8) CAS 25-25-05, an area of oil and/or hydraulic fluid spills beneath the heavy equipment once stored there. (9) CAS 25-25-06, an area of diesel fuel staining beneath two generators that have since been removed. (10) CAS 25-25-07, an area of hydraulic oil spills associated with a tunnel-boring machine abandoned inside X-Tunnel. (11) CAS 25-25-08, an area of hydraulic fluid spills associated with a tunnel-boring machine abandoned inside Y-Tunnel. (12) CAS 25-25-16, a diesel fuel spill from an above-ground storage tank located near Building 3320 at Engine Test Stand-1 (ETS-1) that was removed in 1998. (13) CAS 25-25-17, a hydraulic oil spill associated with the historical operations of a vacuum pump oil recovery system at the E-MAD facility.

K. B. Campbell

2001-11-01T23:59:59.000Z

395

Corrective Action Investigation Plan for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada, Revision 0  

Science Conference Proceedings (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 232, Area 25 Sewage Lagoons, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 232 consists of Corrective Action Site 25-03-01, Sewage Lagoon. Corrective Action Unit 232, Area 25 Sewage Lagoons, received sanitary effluent from four buildings within the Test Cell ''C'' Facility from the mid-1960s through approximately 1996. The Test Cell ''C'' Facility was used to develop nuclear propulsion technology by conducting nuclear test reactor studies. Based on the site history collected to support the Data Quality Objectives process, contaminants of potential concern include volatile organic compounds, semivolatile organic compounds, Resource Conservation and Recovery Act metals, petroleum hydrocarbons, polychlorinated biphenyls, pesticides, herbicides, gamma emitting radionuclides, isotopic plutonium, isotopic uranium, and strontium-90. A detailed conceptual site model is presented in Section 3.0 and Appendix A of this Corrective Action Investigation Plan. The conceptual model serves as the basis for the sampling strategy. Under the Federal Facility Agreement and Consent Order, the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the Corrective Action Decision Document.

USDOE /NV

1999-05-01T23:59:59.000Z

396

Cleanup and treatment (CAT) test: a land-area decontamination project utilizing a vacuum method of soil removal  

SciTech Connect

Areas 11 and 13 of the Nevada Test Site (NTS) are contaminated with varying concentrations of Pu-239, 240 and Am-241. An investigation of a vacuum method of soil removal, the Cleanup and Treatment (CAT) test, was conducted over a 3-month period in the plutonium safety shot or Plutonium Valley portion of Area 11. Soil in Plutonium Valley is of the Aridisol Order. The surface 0 to 10 cm is a gravelly loam, and is strongly alkaline (pH 8.8). A large truck-mounted vacuum unit, rather than conventional earth-moving equipment, was used as the primary soil collection unit. Effectiveness of the vacuum method of soil removal was evaluated in relation to conventional earthmoving procedures, particularly in terms of volume reduction of removed soil achieved over conventional techniques. Radiological safety considerations associated with use of the vacuum unit were evaluated in relation to their impact on a full-scale land decontamination program. Environmental and operational impacts of devegetation with retention of root crowns or root systems were investigated. It is concluded that the CAT test was successful under difficult environmental conditions.

Orcutt, J.A.

1982-08-01T23:59:59.000Z

397

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 390: AREAS 9, 10, AND 12 SPILL SITES, NEVADA TEST SITE, NEVADA  

SciTech Connect

Corrective Action Unit (CAU) 390 consists four Corrective Action Sites (CASs) located in Areas 9, 10, and 12 of the Nevada Test Site. The closure activities performed at the CASs include: (1) CAS 09-99-03, Wax, Paraffin: 2 cubic yards of drilling polymer was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (2) CAS 10-99-01, Epoxy Tar Spill: 2 cubic feet of asphalt waste was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (3) CAS 10-99-03, Tar Spills: 3 cubic yards of deteriorated asphalt waste was removed on June 20,2005, and transported to the Area 9 Landfill for disposal. (4) CAS 12-25-03, Oil Stains (2); Container: Approximately 16 ounces of used oil were removed from ventilation equipment on June 28,2005, and recycled. One CAS 10-22-19, Drums, Stains, was originally part of CAU 390 but was transferred out of CAU 390 and into CAU 550, Drums, Batteries, and Lead Materials. The transfer was approved by the Nevada Division of Environmental Protection on August 19,2005, and a copy of the approval letter is included in Appendix D of this report.

NONE

2005-10-01T23:59:59.000Z

398

Joint Outreach Task Group (JOTG) Calendar: January  

NLE Websites -- All DOE Office Websites (Extended Search)

October 2013 October 2013 Sunday Monday Tuesday Wednesday Thursday Friday Saturday 29 30 1 FWP Event Mound Miamisburg, OH Local Event Y-12 Oak Ridge, TN 2 Local Event X-10 Oak Ridge, TN Local Event X-10 Oak Ridge, TN Local Event Y-12 Oak Ridge, TN FWP Event X-10/Y-12 Oak Ridge, TN 3 Local Event X-10/Y-12 Oak Ridge, TN FWP Event K-25 Oak Ridge, TN 4 5 6 7 8 9 10 Local Event Y-12 Oak Ridge, TN 11 12 Local Event Fernald Harrison, OH Local Event Nevada Test Site Las Vegas, NV 13 14 15 Local Event X-10/Y12 Oak Ridge, TN Local Event Y-12 Oak Ridge, TN 16 EEOICPA Event, Westminster, CO 17 FWP Event Mound Miamisburg, OH EEOICPA Event, Westminster, CO 18 19 20 21 22 23 24 25 Local Event Nevada Test Site Las Vegas, NV 26 Local Event Nevada Test Site Las Vegas, NV 27 Local Event Nevada Test Site Las Vegas, NV 28 29 30 31 1 2 Legend Energy Employees Occupational Illness Compensation Program Act (EEOICPA)

399

Closure Report for Corrective Action Unit 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

This Closure Report (CR) documents the activities performed to close Corrective Action Unit (CAU) 330: Areas 6, 22, and 23 Tanks and Spill Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO of 1996), and the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites, Nevada Test Site (NTS), Nevada (U.S. Department of Energy, National Nuclear Security Administration Nevada Operation Office [NNSA/NV], 2001). CAU 330 consists of the following four Corrective Action Sites (CASs): 06-02-04, 22-99-06, 23-01-02, and 23-25-05 (Figure 1).

A. T. Urbon

2003-07-01T23:59:59.000Z

400

Jackknife Tests for Differences in Autocorrelation between Climate Time Series  

Science Conference Proceedings (OSTI)

Two tests for differences in the lag 1 autocorrelation coefficient based on jackknife estimates are proposed. These tests are developed for the pooled sample of all daily values in a certain calendar mouth (e.g., all January data). Jackknife ...

T. A. Buishand; J. J. Beersma

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Environmental monitoring report for Calendar Year 1986  

Science Conference Proceedings (OSTI)

The results of the 1986 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Large Torus (PLT) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. The Princeton Beta Experiment (PBX) was shut down in December 1985 to undergo major modifications, and will recommence operations in 1987. PLT was shut down in December 1986. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1986. The Environmental Committee became a standing committee of the Executive Safety Board (ESB) and continued to review items of environmental importance. During CY86 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations.

Stencel, J.R.

1987-05-01T23:59:59.000Z

402

Calendar Year 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 30, 2006 October 30, 2006 Audit Report: IG-0744 Follow-up Audit on Stockpile Surveillance Testing October 18, 2006 Audit Letter Report: INS-L-07-0 1 Drug Testing For Security Positions at DOE's Portsmouth and PaducahSites" (S051S036) October 18, 2006 Audit Report: OAS-L-07-02 Emergency Response Training at Lawrence Livermore National Laboratory October 18, 2006 Audit Report: IG-0743 Remediation of the Waste Burial Grounds at the Hanford Site October 12, 2006 Audit Letter Report: OAS-L-07-01 The Bonneville Power Administration's Conservation and Renewables Discount Conservation and Rate Credit Programs October 11, 2006 Inspection Report: IG-0742 Protective Force Property Management at Lawrence Livermore National Laboratory October 10, 2006 Inspection Report: IG-0741 Concerns With Security Barriers at theY-12 National Security Complex

403

Corrective Action Plan for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5 Tonopah Test Range, Nevada  

SciTech Connect

Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from both sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the discharge line at SWS 1 Septic Tank 33-1A (Figure 3). These concentrations are above the PALs of 3.0 mg/kg and 360 {micro}g/kg, respectively (DOE/NV, 1999) but are below the hazardous regulatory levels for these constituents. The soil will be excavated and disposed in the Nevada Test Site (NTS) Area 23 Sanitary Landfill.

D. S. Tobiason

2000-08-01T23:59:59.000Z

404

Identification and Characterization of Hydrogeologic Units at the Nevada Test Site Using Geophysical Logs: Examples from the Underground Test Area Project  

Science Conference Proceedings (OSTI)

The diverse and complex geology of the Nevada Test Site region makes for a challenging environment for identifying and characterizing hydrogeologic units penetrated by wells drilled for the U.S. Department of Energy, National Nuclear Security Administration, Underground Test Area (UGTA) Environmental Restoration Sub-Project. Fortunately, UGTA geoscientists have access to large and robust sets of subsurface geologic data, as well as a large historical knowledge base of subsurface geological analyses acquired mainly during the underground nuclear weapons testing program. Of particular importance to the accurate identification and characterization of hydrogeologic units in UGTA boreholes are the data and interpretation principles associated with geophysical well logs. Although most UGTA participants and stakeholders are probably familiar with drill hole data such as drill core and cuttings, they may be less familiar with the use of geophysical logs; this document is meant to serve as a primer on the use of geophysical logs in the UGTA project. Standard geophysical logging tools used in the UGTA project to identify and characterize hydrogeologic units are described, and basic interpretation principles and techniques are explained. Numerous examples of geophysical log data from a variety of hydrogeologic units encountered in UGTA wells are presented to highlight the use and value of geophysical logs in the accurate hydrogeologic characterization of UGTA wells.

Lance Prothro, Sigmund Drellack, Margaret Townsend

2009-03-25T23:59:59.000Z

405

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 17, 2005 November 17, 2005 Audit Report: IG-0709 Management of the Department's Isotope Program November 17, 2005 Audit Report: IG-0710 Management of Facility Contractors Assigned to the Washington, D.C. Area November 14, 2005 Audit Report: OAS-FS-06-01 Report o the Department of Energy's Fiscal Year 2005 Consolidated Financial Statements November 9, 2005 Audit Report: OAS-L-06-01 The Department of Energy's Radio Communications Systems November 9, 2005 Special Report: IG-0707 The Department of Energy's Response to Hurricanes Katrina and Rita November 9, 2005 Inspection Report: IG-0708 Quality Assurance Weaknesses in the Review of Yucca Mountain Electronic Mail for Relevancy to the Licensing Process October 17, 2005 Audit Report: IG-0706 Accelerated Tank Waste Retrieval Activities at the Hanford Site

406

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 10, 2005 June 10, 2005 Audit Report: OAS-L-05-07 The Department of Energy's Annual Report to Congress on Management and Operating Contractor Employees in the Washington, D.C. Area June 3, 2005 Audit Report: OAS-M-05-06 Management Controls over Selected Departmental Critical Monitoring and Control Systems May 20, 2005 Audit Report: IG-0690 Contractor Post-Retirement Health Benefits at the Oak Ridge Reservation May 12, 2005 Audit Report: IG-0689 Selected Energy Efficiency and Renewable Energy Projects May 10, 2005 Audit Report: OAS-M-05-05 Management Controls over Patent and Royalty Income at Ames Laboratory May 9, 2005 Audit Report: OAS-L-05-06 Contractor-Provided Meals for Federal Employees May 3, 2005 Audit Report: IG-0688 National Nuclear Security Administration's Pit Disassembly and Conversion

407

Calendar Year 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 20, 2011 October 20, 2011 Evaluation Report: IG-0856 The Department's Unclassified Cyber Security Program - 2011 September 30, 2011 Examination Report: OAS-RA-11-20 People's Equal Action and Community Effort, Inc. -Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 September 30, 2011 Examination Report: OAS-RA-11-21 Action for a Better Community, Inc. - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 September 30, 2011 Audit Report: OAS-RA-L-11-13 The 12 GeV CEBAF Upgrade Project at Thomas Jefferson National Accelerator Facility September 29, 2011 Examination Report: OAS-RA-11-18 Community Action Partnership of the Greater Dayton Area - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment

408

Calendar Year 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 22, 2008 May 22, 2008 Inspection Report: IG-0794 Office of Science Laboratory Conferences May 20, 2008 Audit Report: OAS-L-08-10 Audit of Joint Appointments at Office of Science Laboratories April 28, 2008 Audit Report: OAS-M-08-07 Yucca Mountain Project Document Suspension April 24, 2008 Audit Report: OAS-M-08-06 Management Controls over Defense Related High Risk Property April 17, 2008 Audit Report: OAS-L-08-09 The Department's Controls over Leased Space in the National CapitalArea April 11, 2008 Audit Report: IG-0793 The Department's Progress in Meeting Los Alamos National Laboratory Consent Order Milestones April 2, 2008 Special Report: IG-0792 Review of Alleged Conflicts of Interest Involving a Legal Services Contractor forthe Yucca Mountain Project License Application

409

Calendar Year 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 28, 2013 March 28, 2013 Examination Report: OAS-RA-13-17 Community Action Partnership of San Bernardino County - Weatherization Assistance Program Funds Provided by the American Recovery and Reinvestment Act of 2009 March 28, 2013 Audit Report: OAS-RA-13-16 The Department of Energy's American Recovery and Reinvestment Act Energy Efficiency and Conservation Block Grant Program-State of Colorado and County of Boulder March 22, 2013 Inspection Report: DOE-IG-0882 Approval of Contractor Executive Salaries by Department of Energy Personnel March 21, 2013 Audit Report: OAS-RA-13-15 The Department of Energy's Industrial Carbon Capture and Storage Program Funded by the American Recovery and Reinvestment Act March 20, 2013 Inspection Report: INS-O-13-03 Inspection Report - Radiological Waste Operations in Area G at Los Alamos

410

A Comparative Study of Year-Round and Traditional Calendar Schools in Chicago.  

E-Print Network (OSTI)

?? Restructuring the school calendar has been investigated by school districts as a possible way to increase student achievement in order to meet the standards (more)

Winkelmann, Andrea Therese

2010-01-01T23:59:59.000Z

411

Site Environmental Report for Calendar Year 2001 (GJO-2002-341...  

Office of Legacy Management (LM)

to environmental activities conducted during calendar year 2001 at the U.S. Department of Energy (DOE) Grand Junction Office (GJO) facility in Grand Junction, Colorado. WASTREN,...

412

Corrective Action Plan for Corrective Action Unit 254: Area 25 R-MAD Decontamination Facility Nevada Test Site, Nevada  

Science Conference Proceedings (OSTI)

The Area 25 Reactor Maintenance, Assembly, and Disassembly Decontamination Facility is identified in the Federal Facility Agreement and Consent Order (FFACO) as Corrective Action Unit (CAU) 254. CAU 254 is located in Area 25 of the Nevada Test Site and consists of a single Corrective Action Site CAS 25-23-06. CAU 254 will be closed, in accordance with the FFACO of 1996. CAU 254 was used primarily to perform radiological decontamination and consists of Building 3126, two outdoor decontamination pads, and surrounding soil within an existing perimeter fence. The site was used to decontaminate nuclear rocket test-car hardware and tooling from the early 1960s through the early 1970s, and to decontaminate a military tank in the early 1980s. The site characterization results indicate that, in places, the surficial soil and building materials exceed clean-up criteria for organic compounds, metals, and radionuclides. Closure activities are expected to generate waste streams consisting of nonhazardous construction waste. petroleum hydrocarbon waste, hazardous waste, low-level radioactive waste, and mixed waste. Some of the wastes exceed land disposal restriction limits and will require off-site treatment before disposal. The recommended corrective action was revised to Alternative 3- ''Unrestricted Release Decontamination, Verification Survey, and Dismantle Building 3126,'' in an addendum to the Correction Action Decision Document.

C. M. Obi

2000-12-01T23:59:59.000Z

413

Closure Report for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU)553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S.Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 553 are located within Areas 19 and 20 of the Nevada Test Site. Corrective Action Unit 553 is comprised of the following CASs: 19-99-01, Mud Spill 19-99-11, Mud Spill 20-09-09, Mud Spill 20-99-03, Mud Spill The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 553 were met. To achieve this, the following actions were or will be performed: Review the current site conditions including the concentration and extent of contamination. Implement any corrective actions necessary to protect human health and the environment. Properly dispose of corrective action and investigation wastes. Document the Notice of Completion and closure of CAU 553 to be issued by Nevada Division of Environmental Protection.

Al Wickline

2007-08-01T23:59:59.000Z

414

Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0  

Science Conference Proceedings (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2004-04-06T23:59:59.000Z

415

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 408, Bomblet Target Area. CAU 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. One Corrective Action Site (CAS) is included in CAU 408: {lg_bullet} CAS TA-55-002-TAB2, Bomblet Target Areas Based on historical documentation, personnel interviews, process knowledge, site visits, aerial photography, multispectral data, preliminary geophysical surveys, and the results of data quality objectives process (Section 3.0), clean closure will be implemented for CAU 408. CAU 408 closure activities will consist of identification and clearance of bomblet target areas, identification and removal of depleted uranium (DU) fragments on South Antelope Lake, and collection of verification samples. Any soil containing contaminants at concentrations above the action levels will be excavated and transported to an appropriate disposal facility. Based on existing information, contaminants of potential concern at CAU 408 include explosives. In addition, at South Antelope Lake, bomblets containing DU were tested. None of these contaminants is expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results. The corrective action investigation and closure activities have been planned to include data collection and hold points throughout the process. Hold points are designed to allow decision makers to review the existing data and decide which of the available options are most suitable. Hold points include the review of radiological, geophysical, and analytical data and field observations.

NSTec Environmental Management

2006-10-01T23:59:59.000Z

416

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 31, 2003 March 31, 2003 Inspection Report: IG-0594 Emergency Medical Coordination Memorandum of Agreement at Brookhaven National Laboratory March 20, 2003 Inspection Report: IG-0591 Allegations Concerning the Reporting of a Radiological Incident at the Los Alamos National Laboratory March 13, 2003 Audit Report: IG-0590 Refurbishment of the W80 - Weapon Type March 11, 2003 Audit Report: IG-0589 Transfer of Excess Personal Property From the Nevada Test Site to the Community Reuse Organization March 5, 2003 Audit Report: OAS-L-03-12 Department of Energy's Safety Bases for Nuclear Facilities March 3, 2003 Audit Report: IG-0588 Treatment of Mixed Incinerable Waste March 1, 2003 Inspection Report: IG-0592 Actions Taken in Response to Missing Hazardous Waste Containing Cyanide February 26, 2003

417

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15, 2005 April 15, 2005 Audit Report: IG-0685 The Retention and Management of the Department's Records April 14, 2005 Audit Report: IG-0684 Deactivating and Decommissioning Facilities at the Savannah River Site March 31, 2005 Audit Report: OAS-L-05-04 Review of the Department's Controls over Services Acquired through Memoranda of Agreement with Other Federal Agencies and Blanket Purchase Agreements March 30, 2005 Audit Report: OAS-L-05-05 Audit of the Spallation Neutron Source Project March 29, 2005 Special Report: IG-0683 Fast Flux Test Reactor: Re-evaluation of the Department's Approach to Deactivation, Decontamination, and Decommissioning March 24, 2005 Inspection Report: IG-0682 The Department of Energy's Review of Chemical and Biological Export License Applications March 24, 2005

418

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 12, 2007 July 12, 2007 Investigation Memorandum: OIG Case No. I07AL011 Investigation of Alleged False Certifications Relating to Testing of the Contingency Protective Force at the Pantex Plant, OIG Case No. I07AL011 July 11, 2007 Audit Letter Report: INS-L-07-07 Alleged Unneccessary Protecitve Force Equipment Purchases at Pantex July 9, 2007 Audit Report: OAS-L-07-14 Agreed-Upon Procedures for Federal Payroll June 29, 2007 Inspection Report: IG-0769 Management of the Workers Compensation Program at Department of Energy Headquarters June 22, 2007 Audit Report: IG-0768 Facility Contractor Acquisition and Management of Information Technology Hardware June 19, 2007 Special Report: IG-0767 Expansion of the Strategic Petroleum Reserve June 4, 2007 Audit Report: OAS-M-07-04 Follow-Up Audit of the National Nuclear Security Administration's

419

Calendar Year 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 19, 2003 February 19, 2003 Audit Report: OAS-L-03-10 Audit of the Research and Development Investment Criteria for Fossil Energy February 12, 2003 Inspection Report: S021S013 Inspection Report to Management on Inspection of 2001 Safeguards and Security Survey of Los Alamos National Laboratory February 12, 2003 Inspection Report: IG-0585 Inspection of Implementation of Corrective Actions Resulting From Force-on-Force Performance Tests February 1, 2003 Annual Performance Plan: IG-APP-005 Planning for and Measuring Office of Inspector General Results FY 2002 Annual Performance Report and FY 2003 Annual Performance Plan January 28, 2003 Special Inquiry: IG-0584 Operations at Los Alamos National Laboratory January 27, 2003 Audit Report: IG-0583 Management of Beryllium Metal Supply

420

Calendar Year 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 18, 2007 September 18, 2007 Evaluation Report: IG-0776 The Department's Unclassified Cyber Security Program - 2007 September 17, 2007 Audit Report: OAS-M-07-06 Management Controls over the Hanford Environmental Information System September 12, 2007 Audit Letter Report: OAS-L-07-24 Use of External Independent Reviews at Environmental Management Sites September 12, 2007 Audit Report: IG-0775 National Nuclear Security Administration's Construction of aRadiological/Nuclear Complex for Homeland Security September 7, 2007 Inspection Report: IG-0774 Material Control and Accountability at Los Alamos National Laboratory August 20, 2007 Special Report: OAS-M-07-05 National Security Technologies, LLC Internal Audit Implementation Design August 17, 2007 Audit Report: IG-0773 Confirmatory Bioassay Testing at Selected Sites

Note: This page contains sample records for the topic "test areas calendar" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Calendar Year 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 30, 2005 September 30, 2005 Inspection Report: IG-0703 Characterization Wells at Los Alamos National Laboratory September 30, 2005 Inspection Report: IG-0701 Electronic Recording of Telephone and Radio Conversations by Sandia Protective Force Management September 30, 2005 Audit Report: IG-0702 Use of Performance Based Incentives by the Office of Civilian Radioactive Waste Management September 27, 2005 Evaluation Report: IG-0700 The Department's Unclassified Cyber Security Program-2005 September 16, 2005 Audit Report: IG-0699 The Los Alamos National Laboratory Hydrodynamic Test Program September 9, 2005 Audit Report: IG-0698 Sludge Removal Operations at the Hanford Site's K Basins August 30, 2005 Audit Report: IG-0697 The National Nuclear Security Administration's Refurbishment of the B61

422

Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area, Nye County, Nevada, Rev. No.: 0  

SciTech Connect

A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites, Corrective Action Unit 443'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first phase involved the gathering and interpretation of geologic and hydrogeologic data, and inputting the data into a three-dimensional numerical model to depict groundwater flow. The output from the groundwater flow model was used in a transport model to simulate the migration of a radionuclide release (Pohlmann et al., 2000). The second phase of modeling (known as a Data Decision Analysis [DDA]) occurred after NDEP reviewed the first model. This phase was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third phase of modeling updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003). Corrective action alternatives were evaluated and an alternative was submitted in the ''Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface'' (NNSA/NSO, 2004). Based on the results of this evaluation, the preferred alternative for CAU 443 is Proof-of-Concept and Monitoring with Institutional Controls. This alternative was judged to meet all requirements for the technical components evaluated and will control inadvertent exposure to contaminated groundwater at CAU 443.

Tim Echelard

2006-01-01T23:59:59.000Z

423

Corrective Action Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada  

SciTech Connect

The Area 25 Underground Storage Tanks site Corrective Action Unit (CAU) 135 will be closed by unrestricted release decontamination and verification survey, in accordance with the Federal Facility Agreement and Consert Order (FFACO, 1996). The CAU includes one Corrective Action Site (CAS). The Area 25 Underground Storage Tanks, (CAS 25-02-01), referred to as the Engine-Maintenance Assembly and Disassembly (E-MAD) Waste Holdup Tanks and Vault, were used to receive liquid waste from all of the radioactive drains at the E-MAD Facility. Based on the results of the Corrective Action Investigation conducted in June 1999 discussed in the Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks, Nevada Test Site, Nevada (DOE/NV,1999a), one sample from the radiological survey of the concrete vault interior exceeded radionuclide preliminary action levels. The analytes from the sediment samples that exceeded the preliminary action levels are polychlorinated biphenyls, Resource Conservation and Recovery Act metals, total petroleum hydrocarbons as diesel-range organics, and radionuclides. Unrestricted release decontamination and verification involves removal of concrete and the cement-lined pump sump from the vault. After verification that the contamination has been removed, the vault will be repaired with concrete, as necessary. The radiological- and chemical-contaminated pump sump and concrete removed from the vault would be disposed of at the Area 5 Radioactive Waste Management Site. The vault interior will be field surveyed following removal of contaminated material to verify that unrestricted release criteria have been achieved.

D. H. Cox