Powered by Deep Web Technologies
Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network (OSTI)

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST METHOD SELECTION LIST ­ CRYPTOGRAPHIC AND SECURITY TESTING NVLAP CRYPTOGRAPHIC AND SECURITY TESTING APPLICATION FORM (REV. 2013 and Security (BCS)" testing and is considered the foundation of all scopes of accreditation

2

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Testing Advanced Vehicle Testing Activity Maintenance Sheet for 2010 Ford Fusion VIN 3FADP0L32AR194699 Date Mileage Description Cost 1012009 5915 Changed oil and filter 28.77...

3

Fleet Testing Advanced Vehicle Testing Activities - 2010 Honda...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vehicle Testing Activity Maintenance Sheet for 2010 Honda Insight LX VIN JHMZE2H59AS011748 HEV Fleet Testing Date Mileage Description Cost 842009 5,752 Changed oil and filter...

4

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING  

E-Print Network (OSTI)

DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST PROCEDURE SELECTION LIST ­ HEALTHCARE IT TESTING NVLAP HEALTHCARE IT TESTING APPLICATION (2013-01-02) PAGE 1 OF 3 Instructions: Please check the method for which you are requesting accreditation. NVLAP Code Test Procedure Description 2011

5

DATE: __________________ NVLAP LAB CODE: _________________ Test Method  

E-Print Network (OSTI)

_____ 30/DISC00A ANSI/INCITS 423.1 (2008) Information Technology - Conformance Testing Methodology Standard _____ 30/DISC01A ANSI/INCITS 423.2 (2008) Information Technology - Conformance Testing Methodology Standard - Part 2: Finger minutiae data _____ 30/DISC03A ANSI/INCITS 423.3 (2009) Information Technology

6

Property:ExpActivityDate | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDate ExpActivityDate Jump to: navigation, search Property Name ExpActivityDate Property Type Date Description Exploration Activity Date started or year of activity. Pages using the property "ExpActivityDate" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe At Desert Peak Area (Sladek, Et Al., 2007) + 2007 + 2-M Probe Survey At Coso Geothermal Area (1977) + 1977 + 2-M Probe Survey At Coso Geothermal Area (1979) + 1979 + 2-M Probe Survey At Coso Geothermal Area (2007) + 2007 + 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Acoustic Logs At Coso Geothermal Area (1977) + 1977 + Acoustic Logs At Coso Geothermal Area (2005) + 2005 +

7

Property:ExpActivityDateEnd | Open Energy Information  

Open Energy Info (EERE)

ExpActivityDateEnd ExpActivityDateEnd Jump to: navigation, search Property Name ExpActivityDateEnd Property Type Date Description Date or year exploration activity ended. Pages using the property "ExpActivityDateEnd" Showing 25 pages using this property. (previous 25) (next 25) 2 2-M Probe Survey At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2006 + 2-M Probe Survey At Salt Wells Area (Skord, Et Al., 2011) + 2011 + A Aerial Photography At Coso Geothermal Area (1968-1971) + 1971 + C Compound and Elemental Analysis At Salt Wells Area (Coolbaugh, Et Al., 2006) + 2005 + Compound and Elemental Analysis At Salt Wells Area (Shevenell & Garside, 2003) + 2002 + Conceptual Model At Coso Geothermal Area (2005-2007) + 2007 + Controlled Source Frequency-Domain Magnetics At Salt Wells Area (Montgomery, Et Al., 2005) + 2004 +

8

Solar Activity Index: Validity Supported by Oxygen Isotope Dating  

Science Journals Connector (OSTI)

...CENTURIES OF CLIMATIC RECORD FROM CAMP CENTURY ON GREENLAND ICE SHEET, SCIENCE...sup> concentration in Greenland Camp Century ice core, correlation with solar...activity absolute age Arctic region Camp Century ice core dates general listing...

J. R. Bray

1970-05-01T23:59:59.000Z

9

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: Relocation of National and Homeland Security New Generation Wireless Test Bed Equipment and Personnel SECTION B. Project Description: This activity is to relocate and consolidate Battelle Energy Alliance, LLC (BEA) National and Homeland Security (NHS) New Generation Wireless Test Bed (NGWTB) program personnel and equipment from Critical Infrastructure Test Range Complex (CITRC) to Central Facilitis Area (CFA). This activity also includes relocating the antenna field from vicinity Power Burst Facility (PBF)-641 to the vicinity of PBF-620 Cell Site 9 area. The Remote Testing Monitoring Facility will be relocated from the vicinity of Gate 3 to the Cell Site 9 area. The Cell Site 9 area near PBF-620 is previously disturbed soil and asphalt.

10

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-96 POLICY FLASH 2011-96 DATE: August 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: RFP Section H Clause Templates SUMMARY: On May 3, 2011, twenty two draft Section H clause templates were distributed for Procurement Director (PD), Head of Contracting Activity (HCA), General Counsel and National Nuclear Security Administration (NNSA) review and comment. All comments received were considered and changes were made as appropriate including the elimination of six clauses. The final version of the sixteen RFP Section H clause templates identified below will be available in STRIPES. 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING

11

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title I, Section 1101(a)(2) of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 SUMMARY: Acquisition Letter 2011-04 provides implementing instructions and guidance for Section 1101(a)(2) of the Full-Year Continuing Appropriations Act of 2011, Pub. L. 112-10 (hereinafter "Full-Year Continuing Appropriations Act of 2011). Section 1101(a)(2) of the Act provides that, unless otherwise specified, the authority and conditions provided for projects or activities (including the costs of direct loans and loan guarantees) appropriated, authorized, or

12

DATE:  

Office of Legacy Management (LM)

OOE F 1325.3 OOE F 1325.3 m e m o randum DATE: SEP 23 1988 Department of Energy IL_. 9 REPLY TO AlTN OF, NE-23 SUElJECT. Owner Searches for Potential Sites in Chicago IL, (7 TO: W . Cottrell, ORNL 0. Kozlouski, OTS W h ile in Chicago, Illinois, on September 13, 14, and 15, 1988, I drove to the suspected addresses of several potential FUSRAP sites. No owners were contacted during this activity because most of the work was done after normal working hours or while on the way to the airport when tim e would not permit the visit. I .?I ' - Former C-B Tool Products Co. 956 E. 58th Street Chicago, Illinois The University of Chicago Ingleside Hall is located at this address. It is the University O ffice of Employment and contains a U.S. Post O ffice. The structure is several stories and looks like it may have existed in the

13

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-10-011 EC Document No.: DOE-ID-INL-10-011 DIRECTIONS: Responsible Managers, Project Environmental Lead, and Environmental Support personnel complete this form by following the instructions found at the beginning of each section and submit to Environmental Support & Services (environmental.checklist@inl.gov). SECTION A. Project Title: CFA and ATR-Complex Analytical and R&D Laboratory Operation (Overarching) SECTION B. Project Description: This EC replaces overarching EC INL-05-017 due to changes in the laboratories identified in EC INL-05-017. The proposed action will continue to cover laboratory-based analytical and research and development (R&D) activities in laboratories located at the Central Facility Area (CFA) and the Advanced Test Reactor Complex (ATR-C) at the Idaho National Laboratory (INL). These activities include

14

DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

15

Dates  

NLE Websites -- All DOE Office Websites (Extended Search)

Dates Dates Nature Bulletin No. 511-A December 15, 1973 Forest Preserve District of Cook County George W. Dunne, President Roland F. Eisenbeis, Supt. of Conservation DATES When the wise men from the east, guided by a mysterious new star, traveled to Jerusalem and thence to Bethlehem where they worshipped the infant Jesus and presented Him with gifts, you can be sure that, in addition to gold and frankincense and myrrh, they carried dates as food to sustain them on their long journey. The Date Palm had been cultivated along the Tigris and Euphrates Rivers since the time of the Sumerians, 3000 years before the birth of Christ. This tree, like the coconut palm, is unknown today in its wild state but is believed to have originated in Ethiopia. In early times it was abundant in Palestine and the scientific name, Phoenix, given to the date palm by the Greeks, may be due to the fact that they first saw it in Phoenicia. The "tree of life, " variously referred to in the Bible, was probably this palm.

16

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

17

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 SECTION A. Project Title: TRA-653 HVAC Modifications SECTION B. Project Description: The proposed project plans to replace the existing blowers, swamp coolers and electric heaters in the Idaho National Laboratory (INL) Test Reactor Area-653 (TRA-653) office area with three roof mounted heating, ventilating and air conditioning (HVAC) units; and install six roof mounted HVAC units at the TRA-653 machine shop area. These modifications are needed to enhance workplace habitability, maintain a more consistent building environment, and achieve a more energy efficient system. The TRA- 653 machine shop currently uses portable swamp coolers to cool their shop. TRA-653 is eligible for the National Historic Register, however, the activity as described is exempt from cultural resource review (INL Cultural Resource Management Plan;

18

DATE:  

Office of Legacy Management (LM)

DATE: DATE: AUG 12 1991 REPLY TO ATTN OF: EM-421 (J. Wagoner, 3-8147) SUBIECT: Elimination of the Duriron Company Site TO: The File I have reviewed the attached site summary and elimination recommendation for the Duriron Company Site in Dayton, Ohio. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the Ouriron Company Site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Ale~ander~illiams,~PhD Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment -: bee: Weston EM-40 (2) P. Hevner Review: - OTS NOTE DATE: July 15, 1991 TO: Alexander WiTliams FROM: Dan Stou tF

19

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: April 25, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Federal Awardee Performance and Integrity Information System (FAPIIS) - Public Access SUMMARY: On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of

20

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The...

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Advanced Vehicle Testing Activity: Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview to Overview to someone by E-mail Share Advanced Vehicle Testing Activity: Overview on Facebook Tweet about Advanced Vehicle Testing Activity: Overview on Twitter Bookmark Advanced Vehicle Testing Activity: Overview on Google Bookmark Advanced Vehicle Testing Activity: Overview on Delicious Rank Advanced Vehicle Testing Activity: Overview on Digg Find More places to share Advanced Vehicle Testing Activity: Overview on AddThis.com... Home Overview Light-Duty Vehicles Medium- and Heavy-Duty Vehicles Publications Overview The marketplace for advanced transportation technologies and the focus, direction, and funding of transportation programs are continually changing. The Advanced Vehicle Testing Activity's "2005 Overview of Advanced Technology Transportation" (PDF 736 KB) gives the latest information about

22

DATE:  

Office of Legacy Management (LM)

-RL5- DATE: September 13, 1990 TO: Alexander Williams (w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following with respect to the former American Machine and Foundry Company (AMF) in New York City, New York--FUSRAP Considered Site Recommendation (g/13/90). 1 he recommendation is to eliminate the AMF New York City sites. If you agree, then please return an "approved" and dated copy of this note. Upon receipt of it, we will update the Considered-Sites Data Base for FUSRAP of DOE's intent to eliminate the site. Please call me at 353-1281 if you have +ny questions. cc: J. Wagoner D. Tonkay file FUSRAP NY.59 -------------------------------~---------------------------

23

Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- Vehicle Testing and Demonstration Activities Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and Demonstration Activities 2009 DOE Hydrogen Program and Vehicle...

24

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: May 12, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million SUMMARY: AL 2011-05/FAL 2011-01 (AL/FAL) implements statutory and non-statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance

25

Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2009 3, 2009 Tim Meeks, Administrator Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Dear Administrator Meeks: East River Electric Power Cooperative, Inc. (East River) offers this letter as comment to the Western Area Power Administration's (Western) Federal Register Notice (FRN), (dated March 4, 2009, pp.9392-9393) concerning implementation of Western's new transmission loan or construction authority. East River is a wholesale electric power supply cooperative which provides twenty rural electric cooperatives and one municipal electric system transmission and power supply services. These twenty-one non-profit retail electric providers, which collectively own East River, serve about 90,000 residential, commercial

26

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

and repairing wastewater systems lines and connections that could impact the discharge to wastewater systems. 8. Drinking Water Contamination - Performing maintenance activities on...

27

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

of Impact: Generating and Managing Waste - The proposed activity would generate scrap metal and industrial waste. Project personnel will contact Waste Generator Services (WGS) to...

28

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing...

29

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

30

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-45 3-45 DATE: April 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: DOE Acquisition Guide Chapter 15.1 Source Selection Guide SUMMARY: Attached is a revised Source Selection Guide. The Guide has been updated to reflect changes to DOE policies and practices and includes new topics such as Flow of the Source Selection Process, Source Selection Official Designation, Confidentiality and Conflict of Interest Certificates, Source Selection Training and Roles and Responsibilities. This Flash and its attachments will be available online within a day, at the following website: http://energy.gov/management/office-management/operational-

31

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

EC Document No.: DOE-ID-INL-09-002 EC Document No.: DOE-ID-INL-09-002 SECTION A. Project Title: Smoking Shelters SECTION B. Project Description. Install up to three prefabricated outdoor shelters for smokers. Design and install a shelter base so that shelters can be movable. The base shall be designed to prevent shelters from moving or tipping over due to high winds. Specific location for shelters is to be determined, but the shelter bases will be placed atop existing concrete or asphalt such that no subsurface soil disturbance is expected. SECTION C. Environmental Aspects / Potential Sources of Impact none SECTION D. Determine the Level of Environmental Review (or Documentation) and Reference(s): Identify the applicable categorical exclusion from 10 CFR 1021, Appendix B, give the appropriate justification, and the approval date..

32

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 61 DATE: June 19, 2013 TO: Procurement Directors FROM: Director Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Project Management SUBJECT: The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments SUMMARY: Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112- 199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements

33

DATE:  

Office of Legacy Management (LM)

a? a? ,itbd States Government memorandum Department of Energy DATE: APR 15 893 REPLY TO EM-421 (W. Williams, 903-8149) ATTN OF: Authorization for Remedial Action at the Former Associate Aircraft Site in SUBJECT: Fairfield, Ohio TO: W. Seay, DOE Oak Ridge Field Office The former Associate Aircraft Tool and Manufacturing, Inc., site at 3660 Dixie Highway, Fairfield, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Force Control Industries is the current occupant of the site. This designation is based on the results of radiological surveys and conclusions from an authority review. Copies of the radiological survey reports and the authority review are provided for information. The site has been assigned a low priority under the FUSRAP protocol. The

34

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53 53 DATE: May 15, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04 provides implementing instructions and guidance for Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6. The AL addresses the following: Appropriations Act Section 301(a) Unfunded Requests for Proposals

35

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-12 POLICY FLASH 2013-12 DATE: December 7, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 SUMMARY: With reference to Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-02 regarding Section 301(b) Congressional Notification of Multi-year Contract Award, the spreadsheet is revised for Fiscal Year (FY) 2013 reporting. The revised spreadsheet will now have 5 funding columns that must be filled in for each 301(b) notification instead of 4 columns. The amounts in columns I through L should equal to the

36

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- 36 2- 36 DATE: April 23, 2012 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112- 74 and Related Conference Report SUMMARY: Acquisition Letter (AL) 2012-08 and Financial Assistance Letter (FAL) 2012-01 provides implementing instructions and guidance for Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report. The AL addresses the following: Appropriations Act * Section 301(a) Unfunded Requests for Proposals

37

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 DATE: February 1, 2012 TO: Procurement Directors FROM: Director, Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million SUMMARY: AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The

38

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

39

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Materials and Fuels Complex (MFC) Infrastructure Upgrades - Technical Support Building SECTION B. Project Description: Materials and Fuels Complex (MFC) Infrastructure Upgrades - General The number of researchers and operators at the Materials and Fuels Complex has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The INL will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each

40

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Modular Office Units SECTION B. Project Description: MFC Infrastructure Upgrades - General The number of researchers and operators at MFC has significantly increased, and is projected to increase further in the future to support the expanding research activities at the facility. These activities will require Infrastructure upgrades (office space, potable water, wastewater treatment, communications, etc.) to accommodate the increasing number of personnel and work shifts. The Idaho National Laboratory (INL) will prepare a separate environmental checklist (EC) and conduct the appropriate level of environmental review for each infrastructure improvement project.

42

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICP-12-003 ICP-12-003 SECTION A. Project Title: CPP-684 - Remote Analytical Laboratory Facility Modifications SECTION B. Project Description The proposed activities are intended to render CPP-684 Remote Analytical Laboratory (RAL) as a limited access area by removing existing operational functions that are currently performed in the facility. In general, the activities will involve (1) removing the need for building heat and overall reduction of power consumption; (2) converting the existing fire protection system to an anti-freeze charged system; (3) relocating the Remote Distribution Module (RDM), which is part of installed equipment used for the emergency communication system from CPP-684 to CPP-663; and, if pursued, (4) perform specific tasks which would allow a downgrade CPP-684

43

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SECTION A. Project Title: INL - Site Wide Well Abandonment Activities SECTION B. Project Description The proposed action will abandon inactive wells and injection wells at the Idaho National Laboratory (INL) Site. Wells and injection wells will be abandoned as per MCP-1442, MCP-3480 and the Idaho Department of Water Resources (IDWR) requirements, as applicable. The wells to be abandoned are located both within the INL facility boundaries and outside of the INL facility boundaries. The proposed action will address all classes of wells including Class IV and V injection wells. The wells will be abandoned in accordance with instructions provided in this Environmental Checklist, MCP-3480 and Section 4.5 in MCP-1442, Well Drilling, Maintenance, Surveillance, and Abandonment Activities. The MCPs identify the process to be followed for

44

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

42 42 SECTION A. Project Title: Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute SECTION B. Project Description The objective of this project is to conduct the necessary design, processing, manufacturing, and validation studies to assess powder metallurgy/hot isostatic processing (PM/HIP) as a method to produce very large near-net shaped (NNS) components with erosion/corrosion resistant surfaces for use in nuclear and electrical power generation equipment. * Project tasks include the following: * Modeling of NNS Component Alloy & Mold/Can design * Test coupon development, demonstration, and screening for surface applications

45

HEV Fleet Testing Advanced Vehicle Testing Activity  

NLE Websites -- All DOE Office Websites (Extended Search)

Activity Activity Maintenance Sheet for 2007 Saturn Vue VIN # 5GZCZ33Z07S838122 Date Mileage Description Cost 12/8/2006 5,055 Changed oil $33.95 1/9/2007 12,509 Changed oil $25.88 2/8/2007 17,916 Changed oil $42.78 2/15/2007 19,841 Installed Lojack antitheft system $625.00 4/17/2007 30,124 Changed oil $42.36 6/19/2007 45,307 Changed oil $40.70 6/20/2007 45,695 Replaced two tires $257.46 7/10/2007 50,522 Changed oil $38.94 8/15/2007 55,654 Changed oil $32.85 9/3/2007 Vehicle involved in motor vehicle accident - deer hit car windshield and car was under repair 9/12/2007 60,395 Changed oil and replaced air filter $73.48 10/4/2007 65,226 Changed oil and replaced oil filter $37.16 10/19/2007 65,278 Transaxle service and replaced faulty AC compressor $1,056.62 (paid deductible) $100.00

46

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-003 09-003 SECTION A. Project Title: Removal of Central Facilities Area (CFA)-661 Interior Walls and Mezzanine. SECTION B. Project Description The initial action to be covered under this Environmental Checklist will be removal of the mezzanines from CFA-661 to provide for material storage and work space for the National and Homeland Security (N&HS) Wireless Test Bed project. More specifically, this involves storage of electronic equipment, antennas and antenna masts, personnel supplies, and a variety of spare parts to support the project. In addition to storage, plans include a staging and lay down area where partial assembly of project equipment can be performed. Following completion of N&HS work within CFA-661, Facilities and Site Services will then remove the interior walls.

47

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

48

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 CX Posting No.: DOE-ID-INL-10-003 SECTION A. Project Title: American Recovery and Reinvestment Act (ARRA) Reactive Tracers. SECTION B. Project Description The American Recovery and Reinvestment Act (ARRA) Reactive Tracers project will be conducted at both the Raft River hydrothermal site in South Central Idaho and at the INL Research Center in Idaho Falls. The purpose of this work is to characterize tracers and test these tracers at the Raft River project through use of tracers and methods under realistic conditions. INL researchers will use an existing commercial hydrothermal site at Raft River that is currently operated by U.S. Geothermal, Inc. (USG), with whom INL has established a Cooperative Research and Development Agreement (CRADA) partnership. Numerous wells have previously been

49

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-001 09-001 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way, infrastructures (e.g., pathways, roads, and

50

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

51

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 CX Posting No.: DOE-ID-ICP-12-002 SECTION A. Project Title: ICP Routine Maintenance SECTION B. Project Description The purpose of this document is to address actions that meet the intent of the categorical exclusion (CX) B1.3 as described in 10 CFR 1021, Appendix B to Subpart D. Both typical and non-typical types of actions, such as routine maintenance, minor modifications, and custodial services required to support safe and efficient plant operations even if performed on an infrequent basis are addressed. All of the activities will be performed in support of CWI operations. The actions will occur within site boundaries of the INL and ICP facilities and within leased facilities in Idaho Falls, Idaho. Routine maintenance includes custodial services for buildings, structures, rights-of-way,

52

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 SECTION A. Project Title: Characterization of Fluidized Beds via Pressure Fluctuation Analysis SECTION B. Project Description: The purpose of this work is to conduct research using pressure as a measure of performance for fluidized beds (spouted, bubbling, or slugging) at the Center for Advanced Energy Studies (CAES). The approach to this research activity consists of two main tasks: 1. Sieving the bed media with a motorized sieve shaker - sintered aluminosilicate spheres (used in the petroleum industry as a proppant to hold fractures open when the rock formation has been hydro-fractured) and assorted seeds (mustard, canola, sorghum, etc.). The aluminosilicate spheres have very little dust potential. Some of the aluminosilicates may have free silica

53

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

faqfinaldecember-2010.pdf More Documents & Publications Comment submitted by the Alliance for Water Efficiency (AWE) regarding the Energy Star Verification Testing Program DOE...

54

Hydrogen ICE Vehicle Testing Activities  

SciTech Connect

The Advanced Vehicle Testing Activity teamed with Electric Transportation Applications and Arizona Public Service to develop and monitor the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant. The Pilot Plant provides 100% hydrogen, and hydrogen and compressed natural gas (H/CNG)-blended fuels for the evaluation of hydrogen and H/CNG internal combustion engine (ICE) vehicles in controlled and fleet testing environments. Since June 2002, twenty hydrogen and H/CNG vehicles have accumulated 300,000 test miles and 5,700 fueling events. The AVTA is part of the Department of Energys FreedomCAR and Vehicle Technologies Program. These testing activities are managed by the Idaho National Laboratory. This paper discusses the Pilot Plant design and monitoring, and hydrogen ICE vehicle testing methods and results.

J. Francfort; D. Karner

2006-04-01T23:59:59.000Z

55

Advanced Vehicle Testing Activity (AVTA) ? PHEV Evaluations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Vehicle Testing Activity (AVTA) PHEV Evaluations and Data Collection Advanced Vehicle Testing Activity (AVTA) PHEV Evaluations and Data Collection Presentation from...

56

HEV Fleet Testing Advanced Vehicle Testing Activity  

NLE Websites -- All DOE Office Websites (Extended Search)

VIN # 1N4CL21E87C172351 Date Mileage Description Cost 10/22/2007 3,658 Changed oil $36.39 11/14/2007 7,562 Changed oil $36.39 12/4/2007 12,008 Changed oil $36.41 1/3/2008 15,418 Changed oil $42.31 1/24/2008 19,057 Changed oil $27.60 1/29/2008 19,109 Replaced one tire $82.13 3/4/2008 24,662 Changed oil and filter $35.84 4/8/2008 32,703 Changed oil and filter $27.85 4/30/2008 37,495 Changed oil and filter $27.91 5/21/2008 40,655 Replaced and balanced four tires $258.41 5/29/2008 44,833 Changed oil and filter $27.91 7/2/2008 53,778 Changed oil and filter $27.91 8/4/2008 62,686 Changed oil and filter, replaced air filter and cabin air filter, replaced coolant, and rotated tires $246.04 8/22/2008 66,967 Changed oil and filled windshield washer $41.30

57

HEV Fleet Testing Advanced Vehicle Testing Activity  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Ford Escape 2WD 5 Ford Escape 2WD VIN # 1FMYU95H75KC45881 Date Mileage Description Cost 5/25/2005 6,707 Changed oil (5W20 synthetic) and purchased oil for three oil changes $105.47 7/15/2005 17,236 15K service $438.65 8/17/2005 22,221 Changed oil and rotated tires $27.44 9/26/2005 27,425 Changed oil and rotated tires $28.20 11/8/2005 32,703 30K service $211.63 11/25/2005 33,560 Repaired tire $20.00 1/12/2006 42,632 45K service (included: tire balancing, replacing fuel filter and replacing cabin filter) $274.16 3/8/2006 52,141 Changed oil and rotated tires $31.56 4/19/2006 59,883 60K service $317.80 4/19/2006 59,883 HV traction battery connection failed $262.50 5/17/2006 64,641 Changed oil and rotated tires $34.73 6/5/2006 66,059 Recall for absorbing materials being insufficient above forward corner of the interior headliner no charge

58

HEV Fleet Testing Advanced Vehicle Testing Activity  

NLE Websites -- All DOE Office Websites (Extended Search)

Lexus RX400h Lexus RX400h VIN # JTJHW31U160002575 Date Mileage Description Cost 7/27/2005 5,159 Changed oil no charge 10/5/2005 10,375 10K service $212.23 1/4/2006 15,835 Changed oil and rotated tires $18.21 4/11/2006 21,752 Changed oil and rotated tires $18.69 8/16/2006 26,957 Changed oil and rotated tires $18.69 9/7/2006 27,641 Replaced power switch on rear door Warranty 11/20/2006 29,275 13 trouble codes with install of data box - replaced auxiliary battery Warranty 12/13/2006 32,283 Changed oil and rotated tires $23.18 1/4/2007 36,620 Changed oil $32.38 1/26/2007 41,491 changed oil and replaced filter $55.78 2/19/2007 45,948 Changed oil $40.47 3/29/2007 57,021 Changed oil $31.78 4/20/2007 61,238 Changed oil $35.92 5/11/2007 66,417 Changed oil $33.28

59

Preparation of activated carbon from date pits: Effect of the activation agent and liquid phase oxidation  

Science Journals Connector (OSTI)

Two series of activated carbons have been prepared from date pits; series C, using carbon dioxide as activating agent, and series S, prepared by activation with steam under the same experimental conditions. The obtained samples were oxidized with nitric acid in order to introduce more oxygen surface groups. The surface area and porosity of the parent and oxidized activated carbons were studied by N2 adsorption at 77K and CO2 adsorption at 273K. The oxygen surface complexes were characterized by temperature-programmed decomposition (TPD). The results show that carbon dioxide and steam activations produce microporous carbons with an increasing amount of CO evolving groups when increasing the burn-off. On the other hand, oxidation with nitric acid increases the amount of CO and CO2 evolved by the decomposition of surface oxygen groups, this increase being related to the development of porosity in the carbon with the degree of activation and to the activating agent used (CO2 versus steam).

Meriem Belhachemi; Rachel V.R.A. Rios; Fatima Addoun; Joaqun Silvestre-Albero; Antonio Seplveda-Escribano; Francisco Rodrguez-Reinoso

2009-01-01T23:59:59.000Z

60

Boron-10 ABUNCL Active Testing  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards and Security (NA-241) is supporting the project Coincidence Counting With Boron-Based Alternative Neutron Detection Technology at Pacific Northwest National Laboratory (PNNL) for the development of a 3He proportional counter alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a system based upon 10B-lined proportional tubes in a configuration typical for 3He-based coincidence counter applications. This report provides results from testing of the active mode of the General Electric Reuter-Stokes Alternative Boron-Based Uranium Neutron Coincidence Collar (ABUNCL) at Los Alamos National Laboratory using sources and fuel pins.

Kouzes, Richard T.; Ely, James H.; Lintereur, Azaree T.; Siciliano, Edward R.

2013-07-09T23:59:59.000Z

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Date 2014/05/06 By B. Lucier * final-tests.scm: Add dirichlet-tests ...  

E-Print Network (OSTI)

final-tests.scm: specialize all floating-point operations to be either fixnum or flonum * matlab-to-pufs-triangulation.scm: New file; define coordinates->vertices,

62

New LM Unit Root Tests in the Presence of a Possible Break of Unknown Date and Size  

E-Print Network (OSTI)

New LM Unit Root Tests in the Presence of a Possible Break of Unknown Date and Size John T. Cuddington and Shuichiro Nishioka December 6, 2005 Abstract: Lagrange Multiplier (LM) unit root tests performs poorly when used in LM unit root tests and propose an alternative procedure that uses the sup

63

Cluster Report or Survey Description Date due to IEA Responsible person(s) Comments Summer Activity Report  

E-Print Network (OSTI)

Cluster Report or Survey Description Date due to IEA Responsible person(s) Comments Summer Activity Report Activity reports for Summer, 2013 January 31, 2014 Academic Department Heads By December 13, 2013, data is provided by IEA for report completion. Fall Activity Report Activity reports for Fall, 2013

Fernandez, Eduardo

64

Testing Oxygen Reduction Reaction Activity with the Rotating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique...

65

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DU5A0006063 Date Mileage Description Cost 8192009 5,090 Changed oil and filter and rotated tires 39.28 9162009 14,484 Changed oil and filter and replaced flat tire 152.58 10...

66

FAQ's for: ENERGY STAR Verification Testing Pilot Program dated December 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FAQ for: ENERGY STAR Verification Testing Pilot Program December 2010 Table of Contents Introduction............................................................................................................................... 1 What product types will be tested? ................................................................................................. 1 Will testing continue after the State Energy Efficient Appliance Rebate Program (SEEARP) ends? .................................................................................................................................................... 1 For Consumers .......................................................................................................................... 1

67

Date | Open Energy Information  

Open Energy Info (EERE)

Properties of type "Date" Properties of type "Date" Showing 47 properties using this type. A Property:ASHRAE 169 End Date Property:ASHRAE 169 Start Date B Property:Building/EndPeriod Property:Building/StartPeriod Property:Building/YearConstruction Property:Building/YearConstruction1 Property:Building/YearConstruction2 Property:Buildings/ModelYear Property:Buildings/PublicationYear C Property:CommercialOnlineDate D Property:DSIRE/LstUpdt E Property:EndDate Property:EndYear Property:EnergyAccessYearInitiated Property:Event/Date Property:ExpActivityDate E cont. Property:ExpActivityDateEnd F Property:File/CreationDate Property:FirstWellDate G Property:GEAReportDate Property:Geothermal/FY Property:Geothermal/ProjectEndDate Property:Geothermal/ProjectStartDate H Property:HPBD/DateOfOccupancy I Property:Incentive/DsireLstSubModSummaryUpdt

68

MEMORANDUM DATE  

Office of Legacy Management (LM)

DATE DATE :;++, -m--s B-w- -w---m-- SUBJECT: , ::;:: JLLiucd ALTERN&TE e---e---- --------------------------- CITY&da NCIME: ---------------------- - --------------------- J&f STATE: OWNER ( S 1 -----m-e Past 0 Current: ------------------------ Owner contacted 0 -------------------------- 0 yes no; if ye=, date contacted ------w---s-- TYPE OF OPERATION ----w------------ F Research & Development 0 Facility Type 0 Production scale testing F Pilot Scale 0 Manufacturing 0 Bench Scale Process 0 University Research 0 Theoretical 0 Organization Studies 0 Sample & Analysis 0 Government Sponsored Facility 0 Other --------------------- 0 Production 0 Disposal/Storage TYPE OF CONTRfiCT a--------------- 0 Prim- 0 Subcontract& s Purchase Order

69

Advanced Vehicle Testing Activity (AVTA) - Vehicle Testing and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95% fleet cost split * 151 PHEVs in various testing stages, AVTA paid for 2 vehicles, 14 conversions and 60 data loggers. 15% DOE and 85% fleet cost split 7 FY08 PHEV Testing...

70

Summary of Construction Equipment Tests and Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment Tests A series of tests were conducted by the APS Construction Vibration Measurement Task Force using various pieces of construction equipment at the APCF...

71

Advanced Vehicle Testing Activity: Light-Duty Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Light-Duty Light-Duty Vehicles to someone by E-mail Share Advanced Vehicle Testing Activity: Light-Duty Vehicles on Facebook Tweet about Advanced Vehicle Testing Activity: Light-Duty Vehicles on Twitter Bookmark Advanced Vehicle Testing Activity: Light-Duty Vehicles on Google Bookmark Advanced Vehicle Testing Activity: Light-Duty Vehicles on Delicious Rank Advanced Vehicle Testing Activity: Light-Duty Vehicles on Digg Find More places to share Advanced Vehicle Testing Activity: Light-Duty Vehicles on AddThis.com... Home Overview Light-Duty Vehicles Alternative Fuel Vehicles Plug-in Hybrid Electric Vehicles Hybrid Electric Vehicles Micro Hybrid Vehicles ARRA Vehicle and Infrastructure Projects EVSE Testing Energy Storage Testing Hydrogen Internal Combustion Engine Vehicles Other ICE

72

Advanced Vehicle Testing Activity (AVTA) ? PHEV Evaluations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Speed Voltage 40 FY07 FY08 NYSERDA * The AVTA is testing all six of the New York State Energy Research and Development Agency's PHEV conversions. Models and test status: Model...

73

Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing Oxygen Reduction Reaction Activity Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique Date: Tuesday, March 12, 2013 Innovation for Our Energy Future Shyam S. Kocha: NREL Yannick Garsany: EXCET/NRL Deborah Myers: ANL https://www1.eere.energy.gov/hydrogenandfuelcells/webinars.html Outline 1) Background 2) Experimental Aspects of RDE Testing 3) Basic Measurement Technique & Analysis 4) Parameters Affecting RDE Activity Measurements 1) Impact of Film Deposition & Drying Techniques 2) Impact of Ink Formulation 3) Impact of Nafion Incorporation 4) Impact of particle size effects 5) Correlation with MEA data 5) Electrocatalyst Durability using RDE Measurements 6) Summary 2 Background PEMFC MEA Thin-film RDE Trends of activity and durability in Rotating Disc Electrode (RDE)

74

Round-robin testing of Soleq EV cort according to the SAE J1634 test procedure dated May 1993  

SciTech Connect

The Society of Automotive Engineers Recommended Practice, SAE J1634, {open_quotes}Electric Vehicle Energy Consumption and Range Test Procedure{close_quotes}, May 1993, describes a standard method of determining the range and energy consumption for electric vehicles. Consequent to the U.S. Department of Energy`s (DOE) rulemaking released on February 4, 1994, the EPA is currently considering factoring electric vehicles into the Corporate Average Fuel Economy (CAFE) calculations using the SAE J1634 procedure. The purpose of this project is to provide information regarding the suitability of this recommended practice for determining the energy economy value to be factored into the CAFE. Issues leading to possible inconsistent results (such as the repeatability of the procedure, thoroughness of the procedure`s methods, and variance between different laboratories using different dynamometers) need to be resolved prior to passing legislation which will mandate use of this test in determining the electric vehicle CAFE credit. To this end, separate tests were performed on a Soleq EVcort vehicle by the INEL, the EPA, Ford Motor Company, Southwest Research Institute, and the California Air Resources Board using their own facilities and personnel. Acceptable departures from the driving profile prescribed by SAEJ1634 are not well defined. This deficiency in the procedure is even more noticeable due to the EVcort`s marginal acceleration performance.

Cole, G.H.

1993-05-01T23:59:59.000Z

75

Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles  

NLE Websites -- All DOE Office Websites (Extended Search)

Medium- and Medium- and Heavy-Duty Vehicles to someone by E-mail Share Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Facebook Tweet about Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Twitter Bookmark Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Google Bookmark Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Delicious Rank Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on Digg Find More places to share Advanced Vehicle Testing Activity: Medium- and Heavy-Duty Vehicles on AddThis.com... Home Overview Light-Duty Vehicles Medium- and Heavy-Duty Vehicles Transit Vehicles Trucks Idle Reduction Oil Bypass Filter Airport Ground Support Equipment Medium and Heavy Duty Hybrid Electric Vehicles

76

Recovery Efficiency Test Project: Phase 1, Activity report  

SciTech Connect

This report is the second volume of the Recovery Efficiency Test Phase I Report of Activities. Volume 1 covered selection, well planning, drilling, coring, logging and completion operations. This volume reports on well testing activities, reclamation activities on the drilling site and access roads, and the results of physical and mechanical properties tests on the oriented core material obtained from a horizontal section of the well. 3 refs., 21 figs., 10 tabs.

Overbey, W.K. Jr.; Wilkins, D.W.; Keltch, B.; Saradji, B.; Salamy, S.P.

1988-04-01T23:59:59.000Z

77

Advanced Vehicle Testing Activity (AVTA) ? Non-PHEV Evaluations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Non-PHEV Evaluations and Data Collection Advanced Vehicle Testing Activity (AVTA) Non-PHEV Evaluations and Data Collection Presentation from the U.S. DOE Office of Vehicle...

78

Energy-efficiency testing activities of the Mobile Energy Laboratory  

SciTech Connect

This report summarizes energy-efficiency testing activities during the first and second quarters of fiscal year 1990 applying the Mobile Energy Laboratory (MEL) testing capabilities. Four MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) for energy testing and program support functions at federal facilities. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities.

Parker, G.B.

1991-01-01T23:59:59.000Z

79

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28 28 - DATE: TO: v POLICY FLASH 2008-28 February 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA41 Office of Procurement and Assistance Management SUBJECT: Acquisition Letter (AL) 2008-06, Domestic and Foreign Procurement Preference Requirements SUMMARY: AL 2008-06 (attached) replaces AL 2002-06, dated 08/14/02, "Domestic and Foreign Procurement Preference Rules," which is hereby canceled. AL 2002-06 disseminated deviations to FAR provisions and clauses relating to foreign acquisition for use by Department of Energy (DOE), National Nuclear Security Administration (NNSA), and Power Marketing Administration (PMA) contracting activities. This new AL provides updated deviations to the FAR provisions and clauses for use by DOE,

80

Hydrogen Internal Combustion Engine (ICE) Vehicle Testing Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Internal Combustion Internal Combustion Engine (ICE) Vehicle Testing Activities James Francfort Idaho National Laboratory 2 Paper #2006-01-0433 Presentation Outline Background and goal APS Alternative Fuel (Hydrogen) Pilot Plant - design and operations Fuel dispensing and prototype dispenser Hydrogen (H2) and HCNG (compressed natural gas) internal combustion engine (ICE) vehicle testing WWW Information 3 Paper #2006-01-0433 Background Advanced Vehicle Testing Activity (AVTA) is part of DOE's FreedomCAR and Vehicle Technologies Program These activities are conducted by the Idaho National Laboratory (INL) and the AVTA testing partner Electric Transportation Applications (ETA) 4 Paper #2006-01-0433 AVTA Goal Provide benchmark data for technology modeling, research and development programs, and help fleet managers and

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Flow Test At Rye Patch Area (DOE GTP, 2011) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Rye Patch Area (DOE GTP, 2011) Exploration Activity Details Location Rye Patch Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding...

82

2013 Chevrolet Volt - VIN 3929 - Advanced Vehicle Testing - Beginning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Voltage 3 : 3.00 V Thermal Management: Active - Liquid cooled BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 4,007 mi Date of...

83

2011 Hyundai Sonata Hybrid - vin 3539 Advanced Vehicle Testing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pack Capacity: 5.3 Ah Cooling: ActiveCabin Air Pack Weight: 96 lb BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 5,730 mi Date of...

84

Flow Test At Chena Geothermal Area (Holdmann, Et Al., 2006) ...  

Open Energy Info (EERE)

Exploration Activity Details Location Chena Geothermal Area Exploration Technique Flow Test Activity Date 2005 - 2007 Usefulness useful DOE-funding Unknown Exploration Basis...

85

E-Print Network 3.0 - activation test locations Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

test locations Search Powered by Explorit Topic List Advanced Search Sample search results for: activation test locations Page: << < 1 2 3 4 5 > >> 1 Acoustic Emission Tests...

86

Kinetic and equilibrium adsorption of methylene blue and remazol dyes onto steam-activated carbons developed from date pits  

Science Journals Connector (OSTI)

Steam-activated carbons DS2 and DS5 were prepared by gasifying 600C-date pits carbonization products with steam at 950C to burn-off=20 and 50%, respectively. The textural properties of these carbons were determined from the nitrogen adsorption at ?196C. The chemistry of the carbon surface was determined from the surface pH and from neutralization of the surface carbonoxygen groups of basic and acidic type. The kinetic and equilibrium adsorption of MB and RY on DS2 and DS5 was determined at 27 and 37C and at initial sorption solution pH 37. DS2 and DS5 have expanded surface area, large total pore volume and contain both micro and mesoporosity. They have on their surface basic and acidic groups of different strength and functionality. This enhanced the sorption of the cationic dye (MB) and of the anionic dye (RY). The adsorption of MB and RY on DS2 and DS5 involves intraparticle diffusion and followed pseudo-second order kinetics. The adsorption isotherms were applicable to the Langmuir isotherm and high monolayer capacities for MB and RY dyes were evaluated indicating the high efficiencies of the carbons for dye adsorption.

Sheikha S. Ashour

2010-01-01T23:59:59.000Z

87

Boron-10 ABUNCL Prototype Models And Initial Active Testing  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards and Security (NA-241) is supporting the project Coincidence Counting With Boron-Based Alternative Neutron Detection Technology at Pacific Northwest National Laboratory (PNNL) for the development of a 3He proportional counter alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a system based upon 10B-lined proportional tubes in a configuration typical for 3He-based coincidence counter applications. This report provides results from MCNPX model simulations and initial testing of the active mode variation of the Alternative Boron-Based Uranium Neutron Coincidence Collar (ABUNCL) design built by General Electric Reuter-Stokes. Initial experimental testing of the as-delivered passive ABUNCL was previously reported.

Kouzes, Richard T.; Ely, James H.; Lintereur, Azaree T.; Siciliano, Edward R.

2013-04-23T23:59:59.000Z

88

Final Report - Enhanced LAW Glass Formulation Testing, VSL-07R1130-1, Rev. 0, dated 10/05/07  

SciTech Connect

The principal objective of this work was to extend the glass formulation methodology developed in the earlier work [2, 5, 6] for Envelope A, B and C waste compositions for development of compliant glass compositions targeting five high sodium-sulfur waste loading regions. This was accomplished through a combination of crucible-scale tests, and tests on the DM10 melter system. The DM10 was used for several previous tests on LAW compositions to determine the maximum feed sulfur concentrations that can be processed without forming secondary sulfate phases on the surface of the melt pool. This melter is the most efficient melter platform for screening glass compositions over a wide range of sulfate concentrations and therefore was selected for the present tests. The tests were conducted to provide information on melter processing characteristics and off-gas data, including sulfur incorporation and partitioning. As described above, the main objective was to identify the limits of waste loading in compliant glass formulations spanning the range of expected Na{sub 2}O and SO{sub 3} concentrations in the LAW glasses.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-11-13T23:59:59.000Z

89

MEMORANDUfl DATE  

Office of Legacy Management (LM)

DATE DATE cl e-w --we-- SUBJECT: __------------------------ _ OWNER (S) -----w-e Pamt a __---------------------- current: -------------------_______ Owner contacted 0 yes 0 no; if yes, date contacted --------w-w-- TYPE OF OPERATION ------------- erearch & Development a Facility Typr Praduction scale trstinq Pilot Scale Bench Seal e Process Theoretical Studies Sample & Analysis n Production 0 Disposal/Storage TYPE OF CONTRACT ---------------- 0 Prim* 7z Subcontract& Purchase Order . Mmuf l cturing University Research Organization Government Sponsored Facility Rther ----B.-------------- 0 Othrr information (i.e., cost + fixrd fee, unit prier, time 81 material, rte) -m-M--- -------------------------- ---------------------------- Contract/Purchase Order M

90

E-Print Network 3.0 - activities field test Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

field test Search Powered by Explorit Topic List Advanced Search Sample search results for: activities field test Page: << < 1 2 3 4 5 > >> 1 Space Radiation Shielding Program...

91

Flow Test At Jemez Pueblo Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

GTP) Exploration Activity Details Location Jemez Pueblo Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011)...

92

Flow Test At Steamboat Springs Area (Combs, Et Al., 1999) | Open...  

Open Energy Info (EERE)

Exploration Activity Details Location Steamboat Springs Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References Jim Combs, John...

93

Flow Test At Newberry Caldera Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Exploration Activity Details Location Newberry Caldera Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011)...

94

Testing an Active Diesel Particulate Filter on a 2-Cycle Marine...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Testing an Active Diesel Particulate Filter on a 2-Cycle Marine Engine Testing an Active Diesel Particulate Filter on a 2-Cycle Marine Engine Presentation given at DEER 2006,...

95

Testing of low-temperature stabilization alternatives for salt containing mixed wastes -- Approach and results to date  

SciTech Connect

Through its annual process of identifying technology deficiencies associated with waste treatment, the Department of Energy`s (DOE) Mixed Waste Focus Area (MWFA) determined that the former DOE weapons complex lacks efficient mixed waste stabilization technologies for salt containing wastes. These wastes were generated as sludge and solid effluents from various primary nuclear processes involving acids and metal finishing; and well over 10,000 cubic meters exist at 6 sites. In addition, future volumes of these problematic wastes will be produced as other mixed waste treatment methods such as incineration and melting are deployed. The current method used to stabilize salt waste for compliant disposal is grouting with Portland cement. This method is inefficient since the highly soluble and reactive chloride, nitrate, and sulfate salts interfere with the hydration and setting processes associated with grouting. The inefficiency results from having to use low waste loadings to ensure a durable and leach resistant final waste form. The following five alternatives were selected for MWFA development funding in FY97 and FY98: phosphate bonded ceramics; sol-gel process; polysiloxane; polyester resin; and enhanced concrete. Comparable evaluations were planned for the stabilization development efforts. Under these evaluations each technology stabilized the same type of salt waste surrogates. Final waste form performance data such as compressive strength, waste loading, and leachability could then be equally compared. Selected preliminary test results are provided in this paper.

Maio, V.; Loomis, G. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Spence, R.D. [Oak Ridge National Lab., TN (United States); Smith, G. [Pacific Northwest National Lab., Richland, WA (United States); Biyani, R.K. [SGN Eurisys Services Corp., Richland, WA (United States); Wagh, A. [Argonne National Lab., IL (United States)

1998-05-01T23:59:59.000Z

96

Testing of low temperature stabilization alternatives for salt-containing mixed wastes -- approach and results to date  

SciTech Connect

Through its annual process of identifying technology deficiencies associated with waste treatment, the Department of Energy`s (DOE) Mixed Waste Focus Area (MWFA) determined that the former DOE weapons complex lacks efficient mixed waste stabilization technologies for salt containing wastes. The current method used to stabilize salt waste for compliant disposal is grouting with Portland cement. This method is inefficient since the highly soluble and reactive chloride, nitrate, and sulfate salts interfere with the hydration and setting processes associated with grouting. The following five alternative salt waste stabilization technologies were selected for MWFA development funding in FY97 and FY98: (1) Phosphate Bonded Ceramics, (2) Sol-gel, (3) Polysiloxane, (4) Polyester Resin, and (5) Enhanced Concrete. Comparable evaluations were planned for the stabilization development efforts. Under these evaluations each technology stabilized the same type of salt waste surrogates as specified by the MWFA. Final waste form performance data such as compressive strength, waste loading, and leachability can then be equally compared to the requirements originally specified. In addition to the selected test results provided in this paper, the performance of each alternative stabilization technology, will be documented in formal MWFA Innovative Technology Summary Reports (ITSRs).

Maio, V.; Loomis, G. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States)] [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States); Biyani, R.K. [SGN Eurisys Services Corp., Richland, WA (United States)] [SGN Eurisys Services Corp., Richland, WA (United States); Smith, G. [Pacific Northwest National Lab., Richland, WA (United States)] [Pacific Northwest National Lab., Richland, WA (United States); Spence, R. [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States); Wagh, A. [Argonne National Lab., IL (United States)] [Argonne National Lab., IL (United States)

1998-07-01T23:59:59.000Z

97

Flow Test At Maui Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Additional References Retrieved from "http:en.openei.orgw...

98

LOW ACTIVITY WASTE FEED SOLIDS CARACTERIZATION AND FILTERABILITY TESTS  

SciTech Connect

The primary treatment of the tank waste at the DOE Hanford site will be done in the Waste Treatment and Immobilization Plant (WTP) that is currently under construction. The baseline plan for the WTP Pretreatment facility is to treat the waste, splitting it into High Level Waste (HLW) feed and Low Activity Waste (LAW) feed. Both waste streams are then separately vitrified as glass and sealed in canisters. The LAW glass will be disposed onsite in the Integrated Disposal Facility (IDF). There are currently no plans to treat the waste to remove technetium in the WTP Pretreatment facility, so its disposition path is the LAW glass. Options are being explored to immobilize the LAW portion of the tank waste, i.e., the LAW feed from the WTP Pretreatment facility. Removal of {sup 99}Tc from the LAW Feed, followed by off-site disposal of the {sup 99}Tc, would eliminate a key risk contributor for the IDF Performance Assessment (PA) for supplemental waste forms, and has potential to reduce treatment and disposal costs. Washington River Protection Solutions (WRPS) is developing some conceptual flow sheets for LAW treatment and disposal that could benefit from technetium removal. One of these flowsheets will specifically examine removing {sup 99}Tc from the LAW feed stream to supplemental immobilization. The conceptual flow sheet of the {sup 99}Tc removal process includes a filter to remove insoluble solids prior to processing the stream in an ion exchange column, but the characteristics and behavior of the liquid and solid phases has not previously been investigated. This report contains results of testing of a simulant that represents the projected composition of the feed to the Supplemental LAW process. This feed composition is not identical to the aqueous tank waste fed to the Waste Treatment Plant because it has been processed through WTP Pretreatment facility and therefore contains internal changes and recycle streams that will be generated within the WTP process. Although a Supplemental LAW feed simulant has previously been prepared, this feed composition differs from that simulant because those tests examined only the fully soluble aqueous solution at room temperature, not the composition formed after evaporation, including the insoluble solids that precipitate after it cools. The conceptual flow sheet for Supplemental LAW immobilization has an option for removal of {sup 99}Tc from the feed stream, if needed. Elutable ion exchange has been selected for that process. If implemented, the stream would need filtration to remove the insoluble solids prior to processing in an ion exchange column. The characteristics, chemical speciation, physical properties, and filterability of the solids are important to judge the feasibility of the concept, and to estimate the size and cost of a facility. The insoluble solids formed during these tests were primarily natrophosphate, natroxalate, and a sodium aluminosilicate compound. At the elevated temperature and 8 M [Na+], appreciable insoluble solids (1.39 wt%) were present. Cooling to room temperature and dilution of the slurry from 8 M to 5 M [Na+] resulted in a slurry containing 0.8 wt% insoluble solids. The solids (natrophosphate, natroxalate, sodium aluminum silicate, and a hydrated sodium phosphate) were relatively stable and settled quickly. Filtration rates were in the range of those observed with iron-based simulated Hanford tank sludge simulants, e.g., 6 M [Na+] Hanford tank 241-AN-102, even though their chemical speciation is considerably different. Chemical cleaning of the crossflow filter was readily accomplished with acid. As this simulant formulation was based on an average composition of a wide range of feeds using an integrated computer model, this exact composition may never be observed. But the test conditions were selected to enable comparison to the model to enable improving its chemical prediction capability.

McCabe, D.; Crawford, C.; Duignan, M.; Williams, M.; Burket, P.

2014-04-03T23:59:59.000Z

99

DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 4 DATE: TO: September 2,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Federal Procurement Data System Coding (FPDS) for Hurricane Gustav SUMMARY: An emergency declaration was made in preparation for Hurricane Gustav. The effective date for this declaration was August 29,2008. FPDS has been updated to include Hurricane Gustav as a choice in the data field "National Interest Action." When making an award to support the emergency, please ensure FPDS is properly coded. This Flash will be available online within a day, at the following website: http://www.rnananement.ener~y.~ov/policy guidance/policy flasheshtm. Questions concerning this policy flash should be

100

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Revision 2 Effective October 1, 2007 Braking Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date: _________ Roberta Brayer Approved by: _________________________________________________ Date: _______________ Donald Karner Procedure ETA-HTP06 Revision 2 i TABLE OF CONTENTS 1. Objectives 1 2. Purpose 1 3. Documentation 1 4. Initial Conditions and Prerequisites 1 5. Testing Activity Requirements 3 5.3 Dry Controlled Test 4 6. Glossary 5 7. References 7 Appendices Appendix A - Handling Pad Test Data Sheet 8

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Advanced Vehicle Testing Activity (AVTA) ? Non-PHEV Evaluations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

simulation and analysis technical team every other month * Testing results and life-cycle costs are used by vehicle modelers * Partnering with private sector testers provides...

102

Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique  

Energy.gov (U.S. Department of Energy (DOE))

Presentation slides from the Fuel Cell Technologies Office webinar, Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique, held March 12, 2013.

103

Webinar: Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique  

Energy.gov (U.S. Department of Energy (DOE))

Video recording of the Fuel Cell Technologies Office webinar, Testing Oxygen Reduction Reaction Activity with the Rotating Disc Electrode Technique, originally presented on March 12, 2013.

104

MEMORANDUfl J: FILE DATE  

Office of Legacy Management (LM)

J: FILE DATE J: FILE DATE // //r /so -----------w------m FROM: 9. 34oyc -w--------v----- SUBJECT: D3 Bo;s CL&;C J mL-;+J; - Rcc cap 049 /'A :j$: &336;s L-.fh~ w-f L-1 ALE"nirTE __ ------------- --- ---_------------------ CITY: &u+M- - &. -w---v------ ---B-------w STATE: 0 h' -a---- OWNER(S) --pi::;- l>cl, b af.5 CA.-*>J CD Current: Gr;W i- ~U~&;P~ -------------,,' ,-,,,,-, Owner contacted 0 yes jg no; -------------------------- if yes, date contacted ------m------ TYPE OF OPERATION --w--w----------- & Research & Development a Facility Type 0 Production scale testing Cl Pilot Scale 0 Bench Scale Process 0 Theoretical Studies w Sample & Analysis 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility

105

Date Event  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Timeline of DOE's review of the Solyndra Loan Guarantee Application Timeline of DOE's review of the Solyndra Loan Guarantee Application Date Event 2005 Title XVII Loan Guarantee Program created (as part of EPAct 2005) Aug. 8, 2006 DOE issues solicitation seeking pre-applications for Title XVII loan guarantees Dec. 28, 2006 Solyndra submits pre-application, seeking funding for its Fab 1 manufacturing facility April - June 2007 DOE conducts financial and technical review of Solyndra pre-application Oct. 4, 2007 DOE invites Solyndra, and 15 other applicants, to submit full applications May 6, 2008 Company submits full application, seeking funding for its Fab 2 manufacturing facility. DOE begins due diligence. Sept. 4, 2008 DOE loan programs staff draft memorandum indicating that Solyndra was the "earliest mover" and may receive conditional commitment by January 16, 2009

106

Solar Energy Education. Industrial arts: student activities. Field test edition  

SciTech Connect

In this teaching manual several activities are presented to introduce students to information on solar energy through classroom instruction. Wind power is also included. Instructions for constructing demonstration models for passive solar systems, photovoltaic cells, solar collectors and water heaters, and a bicycle wheel wind turbine are provided. (BCS)

Not Available

1981-02-01T23:59:59.000Z

107

Recovery Efficiency Test Project: Phase 1, Activity report  

SciTech Connect

The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

1987-04-01T23:59:59.000Z

108

Flow Test At Crump's Hot Springs Area (DOE GTP) | Open Energy...  

Open Energy Info (EERE)

Details Location Crump's Hot Springs Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011)...

109

Flow Test At Silver Peak Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Additional References Retrieved from "http:en.openei.orgw...

110

Flow Test At Fish Lake Valley Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Additional References Retrieved from "http:en.openei.orgw...

111

Summary Report on FY12 Small-Scale Test Activities High Temperature Electrolysis Program  

SciTech Connect

This report provides a description of the apparatus and the single cell testing results performed at Idaho National Laboratory during JanuaryAugust 2012. It is an addendum to the Small-Scale Test Report issued in January 2012. The primary program objectives during this time period were associated with design, assembly, and operation of two large experiments: a pressurized test, and a 4 kW test. Consequently, the activities described in this report represent a much smaller effort.

James O'Brien

2012-09-01T23:59:59.000Z

112

CURRENT TESTING ACTIVITIES AT THE ACRELAB RENEWABLE ENERGY SYSTEMS TEST FACILITY , E S Spooner2  

E-Print Network (OSTI)

, AUSTRALIA 2 University of New South Wales, Kensington, NSW, AUSTRALIA 3 Australian CRC for Renewable Energy in a minimum of time. ACRELab was originally conceived as a laboratory for testing remote area power supply and RAPS system components such as inverters. With the growing interest in Grid-connected inverters

113

Testing the quasi-absolute method in photon activation analysis  

SciTech Connect

In photon activation analysis (PAA), relative methods are widely used because of their accuracy and precision. Absolute methods, which are conducted without any assistance from calibration materials, are seldom applied for the difficulty in obtaining photon flux in measurements. This research is an attempt to perform a new absolute approach in PAA - quasi-absolute method - by retrieving photon flux in the sample through Monte Carlo simulation. With simulated photon flux and database of experimental cross sections, it is possible to calculate the concentration of target elements in the sample directly. The QA/QC procedures to solidify the research are discussed in detail. Our results show that the accuracy of the method for certain elements is close to a useful level in practice. Furthermore, the future results from the quasi-absolute method can also serve as a validation technique for experimental data on cross sections. The quasi-absolute method looks promising.

Sun, Z. J. [Chemical Sciences and Engineering Division, Argonne National Laboratory, 9700 S. Cass Ave., Argonne, IL 60439 (United States); Wells, D. [Physics Department, South Dakota School of Mines and Technology, 501 E. Saint Joseph St. Rapid City, SD 57701 (United States); Starovoitova, V.; Segebade, C. [Idaho Accelerator Center, Idaho State University, 921 S. 8th Ave. Pocatello, ID 83209 (United States)

2013-04-19T23:59:59.000Z

114

HEMORANDUH TO: FILE DATE  

Office of Legacy Management (LM)

HEMORANDUH HEMORANDUH TO: FILE DATE 1123 lLjl ---WV-------------- FROM: P. s&w+ -------v-----s-- SUBJECT: lJ+ - e;& SITE NAME: LJo"zL - /L,' de Cd -J--h=- ALTERNATE l --e-e-- ------w------- ---,,,' ,m--, NAME: ---------------------- CITY: LL-pL~ ------------ ------------- STATE3 e--w-- OWNER tS) -----w-- Past I --k-!!.l~ -pa L . -v-----w------- Current: Owner contac?-ed 0 yes 0 no; if yes, I+Lff A zid;&m - -------------------------- date contacted ------B--m--- TYPE OF OPERATION ----------------- a Research 81 Development a Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Procesr 0 Theoretical Studies 0 Sample & Analysis m Manuf acturinq 0 University 0 Research Organization 0 Government Sponrored Facility 0 Other

115

TO: FILE DATE  

Office of Legacy Management (LM)

tlEi?ORANDUH tlEi?ORANDUH TO: FILE DATE FFtOil: c ----'- Y '%d 6- ----_----_ SUBJECT: SITE NAME: ----------STATE: Owner contacted 0 yes qno; if yes, date contacted ---------__-- TYPE OF OPERATION ----~_--_--~----_ &Research & Development @ Praduction scale testing. 0 Pilat Scale 0 Bench Scale Process a Theoretical Studies 0 Sample & Analysis tin Facility Type R Manufacturing IJ University 0 Research Organization IJ Gavernment Sponsored Facility 0 Other ----------------' --~- 0 Production E Disposal/Storage TYPE OF CONTRACT ~~_-~--_---_--__ P Prime 0 I Cl Subcontractor Other information (i.e., cost K Purchase Order jZM pati !& MC4 + fixed fee, unit price, time 81 material, etc) ---------------------_----~-- OWNERSHIP: AEC/MED AEC/MED GOVT GOVT

116

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS)  

E-Print Network (OSTI)

Implementation and Testing of Fault-Tolerant Photodiode-based Active Pixel Sensor (APS) Sunjaya the photodiode and readout transistors into two parallel operating devices, while keeping a common row select-tolerant photodiode APS was designed and fabricated using a CMOS 0.18µm process. Testing included both fully

Chapman, Glenn H.

117

Rough Ride Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

NTP005 NTP005 Revision 2 Effective December 1, 2004 Electric Vehicle Rough Road Course Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Ryan Harkins Approved by: _________________________________________________ Date: _______________ Donald B. Karner ©2004 Electric Transportation Applications All Rights Reserved Procedure ETA-NTP005 Revision 2 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Testing Activity Requirements 6 6.0 Glossary 12 7.0 References 14 Appendices Appendix A - Electric Vehicle Rough Road Test Data Sheet 15

118

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2013 30, 2013 CX-010821: Categorical Exclusion Determination Manufacturing Process for Organic Light-Emitting Diode (OLED) Integrated Substrate CX(s) Applied: B3.6 Date: 07/30/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory July 30, 2013 CX-010771: Categorical Exclusion Determination Relocation of National and Homeland Security (N&HS) activities from Transient Reactor Experiment and Test Facility (TREAT) to Critical Infrastructure Test Range Complex (CITRC) CX(s) Applied: B1.15 Date: 07/30/2013 Location(s): Idaho Offices(s): Nuclear Energy July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina

119

Round-robin testing of a reference glass for low-activity waste forms  

SciTech Connect

A round robin test program was conducted with a glass that was developed for use as a standard test material for acceptance testing of low-activity waste glasses made with Hanford tank wastes. The glass is referred to as the low-activity test reference material (LRM). The program was conducted to measure the interlaboratory reproducibility of composition analysis and durability test results. Participants were allowed to select the methods used to analyze the glass composition. The durability tests closely followed the Product Consistency Test (PCT) Method A, except that tests were conducted at both 40 and 90 C and that parallel tests with a reference glass were not required. Samples of LRM glass that had been crushed, sieved, and washed to remove fines were provided to participants for tests and analyses. The reproducibility of both the composition and PCT results compare favorably with the results of interlaboratory studies conducted with other glasses. From the perspective of reproducibility of analysis results, this glass is acceptable for use as a composition standard for nonradioactive components of low-activity waste forms present at >0.1 elemental mass % and as a test standard for PCTS at 40 and 90 C. For PCT with LRM glass, the expected test results at the 95% confidence level are as follows: (1) at 40 C: pH = 9.86 {+-} 0.96; [B] = 2.30 {+-} 1.25 mg/L; [Na] = 19.7 {+-} 7.3 mg/L; [Si] = 13.7 {+-} 4.2 mg/L; and (2) at 90 C: pH = 10.92 {+-} 0.43; [B] = 26.7 {+-} 7.2 mg/L; [Na] = 160 {+-} 13 mg/L; [Si] = 82.0 {+-} 12.7 mg/L. These ranges can be used to evaluate the accuracy of PCTS conducted at other laboratories.

Ebert, W. L.; Wolf, S. F.

1999-12-06T23:59:59.000Z

120

lead-isotope dating  

Science Journals Connector (OSTI)

lead-isotope dating, lead-lead dating, lead-isotope age measurement, lead-lead age measurement ? Blei-Isotopen(-Alters)bestimmung, f, Blei-Isotopen-Datierung

2014-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 . 1 . January 20,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Commercial Items Test Program SUMMARY: Attached for your information is a copy of Civilian Agency Acquisition Council (CAAC) Letter 2009-04. It advises that the National Defense Authorization Act for Fiscal Year 201 0, Section 8 16 authorizes extension of the Commercial Items Test Program from January 1,20 10 to January 1,20 12 and that an expedited FAR Case is being processed to insert the new date at FAR 13.500(d). Also attached is a class deviation authorizing the use of simplified acquisition procedures for commercial items up to $5.5 million [$I1 million for acquisitions of commercial items under FAR

122

Test Cell Location  

NLE Websites -- All DOE Office Websites (Extended Search)

Mazda 3 i-Stop Mazda 3 i-Stop Test Cell Location APRF- 4WD Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional- Start Stop Vehicle Dynamometer Input Document Date 11/20/2012 Advanced Powertrain Research Facility Test weight [lb] 3250 Vehicle Dynamometer Input Document Date 11/20/2012 Revision Number 1 Advanced Powertrain Research Facility Test weight [lb] Target A [lb] 3250 31.2 Target B [lb/mph] Target C [lb/mph^2] 0.462 0.014 Test Fuel Information - Vehicle equipped with with i-Stop package - Manual Transmission - All tests completed in ECO mode - EPA shift schedule modified based on vehicle shift light activity Revision Number 1 Notes: Fuel type EPA Tier II EEE Gasoline Test Fuel Information - Vehicle equipped with with i-Stop package

123

Final Report - Glass Formulation Testing to Increase Sulfate Volatilization from Melter, VSL-04R4970-1, Rev. 0, dated 2/24/05  

SciTech Connect

The principal objectives of the DM100 and DM10 tests were to determine the impact of four different organics and one inorganic feed additive on sulfate volatilization and to determine the sulfur partitioning between the glass and the off-gas system. The tests provided information on melter processing characteristics and off-gas data including sulfur incorporation and partitioning. A series of DM10 and DM100 melter tests were conducted using a LAW Envelope A feed. The testing was divided into three parts. The first part involved a series of DM10 melter tests with four different organic feed additives: sugar, polyethylene glycol (PEG), starch, and urea. The second part involved two confirmatory 50-hour melter tests on the DM100 using the best combination of reductants and conditions based on the DM10 results. The third part was performed on the DM100 with feeds containing vanadium oxide (V{sub 2}O{sub 5}) as an inorganic additive to increase sulfur partitioning to the off-gas. Although vanadium oxide is not a reductant, previous testing has shown that vanadium shows promise for partitioning sulfur to the melter exhaust, presumably through its known catalytic effect on the SO{sub 2}/SO{sub 3} reaction. Crucible-scale tests were conducted prior to the melter tests to confirm that the glasses and feeds would be processable in the melter and that the glasses would meet the waste form (ILAW) performance requirements. Thus, the major objectives of these tests were to: ? Perform screening tests on the DM10 followed by tests on the DM100-WV system using a LAW -Envelope A feed with four organic additives to assess their impact on sulfur volatilization. ? Perform tests on the DM100-WV system using a LAW -Envelope A feed containing vanadium oxide to assess its impact on sulfur volatilization. ? Determine feed processability and product quality with the above additives. ? Collect melter emissions data to determine the effect of additives on sulfur partitioning and melter emissions. ? Collect and analyze discharged glass to determine sulfur retention in the glass. ? Prepare and characterize feeds and glasses with the additives to confirm that the feeds and the glass melts are suitable for processing in the DM100 melter. ? Prepare and characterize glasses with the additives to confirm that the glasses meet the waste form (ILAW) performance requirements.

Kruger, Albert A.; Matlack, K. A.; Pegg, I. L.; Gong, W.

2013-11-13T23:59:59.000Z

124

Final Report - Glass Formulation Development and DM10 Melter Testing with ORP LAW Glasses, VSL-09R1510-2, Rev. 0, dated 6/12/09  

SciTech Connect

The principal objective of the work described in this Final Report is to extend the glass formulation methodology developed in the earlier work by development of acceptable glass compositions for four LAW compositions specified by ORP that cover the range of sulfate to sodium and potassium to sodium ratios expected in Hanford LAW. The glass formulations were designed to exclude titanium and iron as glass former additives, while tin and vanadium as glass former additives were evaluated for beneficial effects in increasing waste loading in the glasses. This was accomplished through a combination of crucible-scale tests and tests on the DM10 melter system. This melter is the most efficient melter platform for screening glass compositions over a wide range of sulfate concentrations and therefore was selected for the present tests. The current tests provide information on melter processing characteristics and off-gas data, including sulfur incorporation and partitioning.

Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.; Joseph, I.; Muller, I. S.; Gong, W.

2013-11-13T23:59:59.000Z

125

Date created: Date amended: February 2009  

E-Print Network (OSTI)

or on any relevant individual issue � Determining what types of risk are acceptable and which appetite is usually defined as "the amount of risk that an organisation is prepared to accept, tolerateDate created: Date amended: February 2009 - 1 � Risk Management Policy.doc RISK MANAGEMENT POLICY 1

Subramanian, Sriram

126

Final Report - Testing of Optimized Bubbler Configuration for HLW Melter VSL-13R2950-1, Rev. 0, dated 6/12/2013  

SciTech Connect

The principal objective of this work was to determine the glass production rate increase and ancillary effects of adding more bubbler outlets to the current WTP HLW melter baseline. This was accomplished through testing on the HLW Pilot Melter (DM1200) at VSL. The DM1200 unit was selected for these tests since it was used previously with several HLW waste streams including the four tank wastes proposed for initial processing at Hanford. This melter system was also used for the development and optimization of the present baseline WTP HLW bubbler configuration for the WTP HLW melter, as well as for MACT testing for both HLW and LAW. Specific objectives of these tests were to: Conduct DM1200 melter testing with the baseline WTP bubbling configuration and as augmented with additional bubblers. Conduct DM1200 melter testing to differentiate the effects of total bubbler air flow and bubbler distribution on glass production rate and cold cap formation. Collect melter operating data including processing rate, temperatures at a variety of locations within the melter plenum space, melt pool temperature, glass melt density, and melter pressure with the baseline WTP bubbling configuration and as augmented with additional bubblers. Collect melter exhaust samples to compare particulate carryover for different bubbler configurations. Analyze all collected data to determine the effects of adding more bubblers to the WTP HLW melter to inform decisions regarding future lid re-designs. The work used a high aluminum HLW stream composition defined by ORP, for which an appropriate simulant and high waste loading glass formulation were developed and have been previously processed on the DM1200.

Kruger, Albert A.; Pegg, I. L.; Callow, R. A.; Joseph, I.; Matlack, K. S.; Kot, W. K.

2013-11-13T23:59:59.000Z

127

Testing for fault activity at Yucca Mountain, Nevada, using independent GPS results from the BARGEN network  

E-Print Network (OSTI)

Testing for fault activity at Yucca Mountain, Nevada, using independent GPS results from the BARGEN June 2006; published 19 July 2006. [1] Data from BARGEN GPS stations around Yucca Mountain (YM) have at Yucca Mountain, Nevada, using independent GPS results from the BARGEN network, Geophys. Res. Lett., 33

Blewitt, Geoffrey

128

Testing Geometrical Discrimination within an Enzyme Active Site: Constrained Hydrogen Bonding in the Ketosteroid  

E-Print Network (OSTI)

Testing Geometrical Discrimination within an Enzyme Active Site: Constrained Hydrogen Bonding, Stanford UniVersity, Stanford, California 94305, and Departments of Biochemistry and Chemistry-chain reorientation and prevent hydrogen bond shortening by 0.1 ? or less. Further, this constraint has substantial

Herschlag, Dan

129

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

/I // /s 3 /I // /s 3 ------------------- FROM: D. I&+ ---------------- SUBJECT: 5;le r 3-&-F.. SITE /+yNJs l3 ALTERNATE NAME: -w---- -SF ------------------------------ NAME: CITY: c ;A< ;,+,ZJ+ ------------,-L-----,,,,,, STATE: OH --w-w- OWNER(S) -w---s-- past: /" ' A--F5 ---w-m- -e----v-------- Current: 0~. A-+A.~~ -------------------------- Owner contacted 0 yes 0 no; if yes, date contacted ------------- TYPE OF OPERATION -------e--------w 0 Research & Development 0 Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis x Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility 0 Other --------------------- B Production 0 Disposal/Storage TYPE OF CONTRACT

130

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

-.. -.. 37qg: MEMORANDUM TO: FILE DATE =b-- FROM: ---L- _------__ u . SUBJECT: SITE ACl= ALTERNATE NAME: -_______-~-----------------NA~E:__( CITY:--~---------_-STATE:-~~ (2 OWNE!sI_SL f Past- L&cl= w ------------------- ----- Current- w buL.r - ------------ ownq cm-ltacted 0 yes @ "no; if yes, data cnntacte TYPE OF OPERATION -------------_~-~ q Research & Development 0 Production %.cale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample 84 Analysis 0 Production i2 Disposal/Storage 0 Facility T 0 Hanufac 0 Univerrj 0 .R esearc 0 Governm 14 Other 1 I lil IrJ y,/3 Prime 0 Other infcrkion Subcwkractbr (i.e., ?bst + fixed fee! &nit price, Cl Purchase Order time & mate

131

MEMORANDUM TO: FILE DATE  

Office of Legacy Management (LM)

5/22/w 5/22/w ------..------------- FROM: D- f&u+ ---------------- SUBJECT: E/;-+&o.. ReC*-C.AB&;O* +L /z&J; &DC,, /Ptrr; CLonr z-r. SITE NAME: _ ALTERNATE ----------WV-- --------------------- NAME: EAT ---- ------------------ CAY: r-led 4' or k -------------------------- STATE: ti Y VW---- OWNER tS) -------- Past: ---Cl&zt.t.r-----~-~- ---- =urr=nt: ti& LPdA Owner cnntacted 0 yes mo; i+ ye8, -------------------------- date contacted ------------- TYPE OF OPERATION ----------------- w Research & Development E3 Facility Type 0 Production scale testing Cl Pilot Scale a Bench Scale Process B Theoretical Studies 0 Sample & Analysis 0 Manufacturing 0 University @ Research Organization 0 Government Sponsored Facility 17 Other

132

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 < 1 < DATE: TO: FROM: July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

133

Advanced Vehicle Testing - Beginning-of-Test Battery Testing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2.5 V Thermal Mgmt.: Passive, Vacuum-Sealed Unit Pack Weight: 294 kg BATTERY LABORATORY TEST RESULTS SUMMARY Vehicle Mileage and Testing Date Vehicle Odometer: 6,696 mi Date of...

134

MEMORANDUM I TO: FILE DATE  

Office of Legacy Management (LM)

MEMORANDUM MEMORANDUM I TO: FILE DATE -----_-_- FaOM: ~~,~hkcid!,~- ' ALTERNATE CITY: I\ptw)a.yk --~---_--___-~--~---______ STATE: I current: ------------_------_-~~~~~ if yes, date contacted ____ TYPE OF OPERATION -_---_---------__ 0 Research & Development 6 Facility Type 0 Production scale testing 0 Pilat Scale 0 Bench Scale Process 0 Theoretical Studies Sample $ rraductian & Analysis a Manufacturing I 0 University I (1 Research Organization 0 Government Sponao&ed Facility 0 Cither I ----e------y-------- 0 Disposal/Storage TYPE OF CONTRACT --~_----~__~~~-- ' 0 Prime q Subcontract& q Purchase Order cl Other informatian (i.e., cost + fixed fee, unit pri'ce, time & material, qtc) ------- --------------------~------ Contract/Purchase Order #

135

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND  

E-Print Network (OSTI)

UNIVERSITY OF WASHINGTON ANNUAL EQUIPMENT TESTING AND MAINTENANCE SUMMARY DIVING SAFETY PROGRAM Date Tested Condition when received Intermediate Pressure Inhalation Resistance Exhalation Resistance Tested Make Serial Number Date Tested Results DEPTH GAUGE BUOYANCY COMPENSATOR Make Serial Number Date

Wilcock, William

136

Field Testing of Activated Carbon Injection Options for Mercury Control at TXU's Big Brown Station  

NLE Websites -- All DOE Office Websites (Extended Search)

Field TesTing oF AcTivATed cArbon Field TesTing oF AcTivATed cArbon injecTion opTions For Mercury conTrol AT TXu's big brown sTATion Background The 2005 Clean Air Mercury Rule will require significant reductions in mercury emissions from coal-fired power plants. Lignite coal is unique because of its highly variable ash content (rich in alkali and alkaline-earth elements), high moisture levels, low chlorine content, and high calcium content. Unique to Texas lignite coals are relatively high iron and selenium concentrations. When combusting Texas lignite coals, up to 80 percent of the mercury in the flue gas is present as elemental mercury, which is not readily captured by downstream pollution control devices. To better understand the factors that influence mercury control at units firing

137

Nuclear Rocket Test Facility Decommissioning Including Controlled Explosive Demolition of a Neutron-Activated Shield Wall  

SciTech Connect

Located in Area 25 of the Nevada Test Site, the Test Cell A Facility was used in the 1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program. The facility was decontaminated and decommissioned (D&D) in 2005 using the Streamlined Approach For Environmental Restoration (SAFER) process, under the Federal Facilities Agreement and Consent Order (FFACO). Utilities and process piping were verified void of contents, hazardous materials were removed, concrete with removable contamination decontaminated, large sections mechanically demolished, and the remaining five-foot, five-inch thick radiologically-activated reinforced concrete shield wall demolished using open-air controlled explosive demolition (CED). CED of the shield wall was closely monitored and resulted in no radiological exposure or atmospheric release.

Michael Kruzic

2007-09-01T23:59:59.000Z

138

The 1994 Sefidabeh (eastern Iran) earthquakes revisited: new evidence from satellite radar interferometry and carbonate dating about the growth of an active fold above a blind thrust fault  

Science Journals Connector (OSTI)

......in those places where active folds do not necessarily...was done using a cold cathode Technosyn instrument...structural development of active fault and fold systems...14C ages for carbonate materials from Lakes Lahontan and...Dinklage W.S., 1998. Active tectonics at Wheeler......

B. Parsons; T. Wright; P. Rowe; J. Andrews; J. Jackson; R. Walker; M. Khatib; M. Talebian; E. Bergman; E. R. Engdahl

2006-01-01T23:59:59.000Z

139

COUNTRY INSTITUTION SIGNING DATE  

E-Print Network (OSTI)

COUNTRY INSTITUTION SIGNING DATE /RENEWAL WEB SITE ALBANIA University of Tirana 11.12.2001 www /RENEWAL WEB SITE FINLAND JAMK University of Applied Sciences 29.10.2009 www.jamk.fi/ FRANCE ?cole INSTITUTION SIGNING DATE /RENEWAL WEB SITE MACEDONIA St. Cyril and Methodius" University of Skopje 11

Di Pillo, Gianni

140

Iraq Produces Date Sugar  

Science Journals Connector (OSTI)

Iraq will soon begin manufacture of sugar from dates as a result of experiments carried out under a UNESCO program by a Swiss scientist. Development of this industry will save the country some $16 million annually formerly spent for imported sugar.Dates ...

1955-04-18T23:59:59.000Z

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DATE: ____________________ NVLAP LAB CODE: __________________ Test Method  

E-Print Network (OSTI)

Panel Materials-Part A, Sec. 11-20: Static Bending ______ 23/G02a ANSI A208.1-1999 (Sec. 3.3.7) Particleboard, Sec. 3.3.7: Modulus of Rupture and Modulus of Elasticity ______ 23/G02b ANSI A208.2-2002 (Sec. 3 to Surface ______ 23/G03a ANSI A208.1-1999 (Sec. 3.3.6) Particleboard, Sec. 3.3.6: Internal Bond ______ 23/G

142

TO: FILE DATE------  

Office of Legacy Management (LM)

DATE------ DATE------ la Fp7 ---------__ OWNER(.=) m-----z- Past: -----_------------------ Current: ------------i----------- Owner c:nntacted q ye' s y "0; !' L-----J if yea, date contacted TYPE OF OPERATION -------_------___ 0 Research & Development cl Facility Type 0 Production scale testins 0 Pilot Scale 0 Bench Scale Process E Theoretical Studies Sample SI Analysis [7 Manufacturing i University $ Resear.& Organization Government Sponsored Facility 0 Other -~------------------- 0 Production G Di spo5alfStorage TYPE OF CONTRACT ~------~--~~---- 0 Prime 0 Suhccntractnr 0 Purchase Order q Other information (i.e., crJst + fixed fee, unit price, time & material, etc) ------- ---------------------------- ~Canfrakt/Purchase Order # ----------------___---------

143

Vehicle Technologies Office Merit Review 2014: Overview and Progress of the Battery Testing, Design and Analysis Activity  

Energy.gov (U.S. Department of Energy (DOE))

Presentation given by the Department of Energy's Energy Storage area at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about the battery testing, design, and analysis activity.

144

Dating the Vinland Map  

ScienceCinema (OSTI)

Scientists from Brookhaven National Laboratory, the University of Arizona, and the Smithsonian Institution used carbon-dating technology to determine the age of a controversial parchment that might be the first-ever map of North America.

None

2013-07-17T23:59:59.000Z

145

The Science of Solar As part of its public outreach activities, the UC Davis-UC Santa Cruz Solar Collaborative wishes to provide up-to-date,  

E-Print Network (OSTI)

The Science of Solar As part of its public outreach activities, the UC Davis-UC Santa Cruz Solar by a group of UC Davis undergraduates, graduate students, researchers, and professors. The goal to disseminate information on the energy source of the future, may elect to share their knowledge with the public

146

Laboratory Evaporation Testing Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant  

SciTech Connect

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream, LAW Off-Gas Condensate, from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of canistered glass waste forms. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to be within acceptable concentration ranges in the LAW glass. Diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the impact of potential future disposition of this stream in the Hanford tank farms, and investigates auxiliary evaporation to enable another disposition path. Unless an auxiliary evaporator is used, returning the stream to the tank farms would require evaporation in the 242-A evaporator. This stream is expected to be unusual because it will be very high in corrosive species that are volatile in the melter (chloride, fluoride, sulfur), will have high ammonia, and will contain carryover particulates of glass-former chemicals. These species have potential to cause corrosion of tanks and equipment, precipitation of solids, release of ammonia gas vapors, and scale in the tank farm evaporator. Routing this stream to the tank farms does not permanently divert it from recycling into the WTP, only temporarily stores it prior to reprocessing. Testing is normally performed to demonstrate acceptable conditions and limits for these compounds in wastes sent to the tank farms. The primary parameter of this phase of the test program was measuring the formation of solids during evaporation in order to assess the compatibility of the stream with the evaporator and transfer and storage equipment. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW facility melter offgas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet, and, thus, the composition will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. This report discusses results of evaporation testing of the simulant. Two conditions were tested, one with the simulant at near neutral pH, and a second at alkaline pH. The neutral pH test is comparable to the conditions in the Hanford Effluent Treatment Facility (ETF) evaporator, although that evaporator operates at near atmospheric pressure and tests were done under vacuum. For the alkaline test, the target pH was based on the tank farm corrosion control program requirements, and the test protocol and equipment was comparable to that used for routine evaluation of feed compatibility studies for the 242-A evaporator. One of the

Adamson, Duane J.; Nash, Charles A.; McCabe, Daniel J.; Crawford, Charles L.; Wilmarth, William R.

2014-01-27T23:59:59.000Z

147

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL...  

NLE Websites -- All DOE Office Websites (Extended Search)

COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL YEAR BREAKDOWN OF FUNDS ELEMENTS FY FY FY FY FY TOTAL Direct Labor Overhead Materials Supplies Travel Other Direct...

148

Design and Test of an Event Detector for the ReflectoActive Seals System  

SciTech Connect

The purpose of this thesis was to research, design, develop and test a novel instrument for detecting fiber optic loop continuity and spatially locating fiber optic breaches. The work is for an active seal system called ReflectoActive Seals whose purpose is to provide real time container tamper indication. A Field Programmable Gate Array was used to implement a loop continuity detector and a spatial breach locator based on a high acquisition speed single photon counting optical time domain reflectometer. Communication and other control features were added in order to create a usable instrument that met defined requirements. A host graphical user interface was developed to illustrate system use and performance. The resulting device meets performance specifications by exhibiting a dynamic range of 27dB and a spatial resolution of 1.5 ft. The communication scheme used expands installation options and allows the device to communicate to a central host via existing Local Area Networks and/or the Internet.

Stinson, Brad J [ORNL

2006-05-01T23:59:59.000Z

149

Design and Test of an Event Detector and Locator for the ReflectoActive Seals System  

SciTech Connect

The purpose of this work was to research, design, develop and test a novel instrument for detecting fiber optic loop continuity and spatially locating fiber optic breaches. The work is for an active seal system called ReflectoActive{trademark} Seals whose purpose is to provide real time container tamper indication. A Field Programmable Gate Array was used to implement a loop continuity detector and a spatial breach locator based on a high acquisition speed single photon counting optical time domain reflectometer. Communication and other control features were added in order to create a usable instrument that met defined requirements. A host graphical user interface was developed to illustrate system use and performance. The resulting device meets performance specifications by exhibiting a dynamic range of 27dB and a spatial resolution of 1.5 ft. The communication scheme used expands installation options and allows the device to communicate to a central host via existing Local Area Networks and/or the Internet.

Stinson, Brad J [ORNL

2006-06-01T23:59:59.000Z

150

Energy-efficiency testing activities of the Mobile Energy Laboratory - Semiannual Report: April 1, 1990, Through September 30, 1990  

SciTech Connect

This report summarizes energy-efficiency testing activities applying the Mobile Energy Laboratory (MEL) testing capabilities during the third and fourth quarters of fiscal year (FY) 1990. The MELs, developed by the US Department of Energy (DOE) Federal Energy Management Program (FEMP), are administered by Pacific Northwest Laboratory (PNL) and the Naval Energy and Environmental Support Activity (NEESA) for energy testing and energy conservation program support functions at federal facilities. MELs are equipped for the on-site evaluation of energy use efficiency. The using agencies principally fund MEL applications, while DOE/FEMP funds program administration and capability enhancement activities. This report fulfills the requirements established in Section 8 of the MEL Use Plan (PNL-6861) for semiannual reporting on energy-efficiency testing activities using the MEL capabilities. The MEL Use Committee, formally established in 1989, developed the MEL Use Plan and meets semiannually to establish priorities for energy-efficient testing applications using the MEL capabilities. This report describes the testing, test results, and suggested courses of action.

Parker, G.B.; Currie, J.W.

1991-03-01T23:59:59.000Z

151

A data base and a standard material for use in acceptance testing of low-activity waste products  

SciTech Connect

The authors have conducted replicate dissolution tests following the product consistency test (PCT) procedure to measure the mean and standard deviation of the solution concentrations of B, Na, and Si at various combinations of temperature, duration, and glass/water mass ratio. Tests were conducted with a glass formulated to be compositionally similar to low-activity waste products anticipated for Hanford to evaluate the adequacy of test methods that have been designated in privatization contracts for use in product acceptance. An important finding from this set of tests is that the solution concentrations generated in tests at 20 C will likely be too low to measure the dissolution rates of waste products reliably. Based on these results, the authors recommend that the acceptance test be conducted at 40 C. Tests at 40 C generated higher solution concentrations, were more easily conducted, and the measured rates were easily related to those at 20 C. Replicate measurements of other glass properties were made to evaluate the possible use of LRM-1 as a standard material. These include its composition, homogeneity, density, compressive strength, the Na leachability index with the ANSI/ANS 16.1 leach test, and if the glass is characteristically hazardous with the toxicity characteristic leach procedure. The values of these properties were within the acceptable limits identified for Hanford low-activity waste products. The reproducibility of replicate tests and analyses indicates that the glass would be a suitable standard material.

Wolf, S.F.; Ebert, W.L.; Luo, J.S.; Strachan, D.M.

1998-04-01T23:59:59.000Z

152

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

d d POLICY FLASH 2010-64 DATE: TO: FROM: July 7,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 I Office of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-42 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date. To view FAC 2005-42 go to the Federal Register Browse web link at http://www.~~oaccess.~ov/fr/browse.html and search for the Federal Register Volume 75, Number 115 for Wednesday, June 16,2010.

153

History of Radiocarbon Dating  

DOE R&D Accomplishments (OSTI)

The development is traced of radiocarbon dating from its birth in curiosity regarding the effects of cosmic radiation on Earth. Discussed in historical perspective are: the significance of the initial measurements in determining the course of developments; the advent of the low-level counting technique; attempts to avoid low-level counting by the use of isotopic enrichment; the gradual appearance of the environmental effect due to the combustion of fossil fuel (Suess effect); recognition of the atmosphere ocean barrier for carbon dioxide exchange; detailed understanding of the mixing mechanism from the study of fallout radiocarbon; determination of the new half-life; indexing and the assimilation problem for the massive accumulation of dates; and the proliferation of measurement techniques and the impact of archaeological insight on the validity of radiocarbon dates. (author)

Libby, W. F.

1967-08-15T23:59:59.000Z

154

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

155

Create Date: Create Time  

E-Print Network (OSTI)

provisions. AB 0074 Ch. 666 Assembly Member Ma Public event action plans and cooperative agreements. AB 0080 Ch. 138 Assembly Member Fong Presidential primary: election date. AB 0082 Ch. 92 * Assembly Assembly Member Fong Elections: new citizens. AB 0089 Ch. 390 * Assembly Member Hill County employees

156

Quantum Dating Market  

E-Print Network (OSTI)

We consider the dating market decision problem under the quantum mechanics point of view. Quantum states whose associated amplitudes are modified by men strategies are used to represent women. Grover quantum search algorithm is used as a playing strategy. Success is more frequently obtained by playing quantum than playing classic.

O. G. Zabaleta; C. M. Arizmendi

2010-03-04T23:59:59.000Z

157

TESTING DIAGNOSTICS OF NUCLEAR ACTIVITY AND STAR FORMATION IN GALAXIES AT z > 1  

SciTech Connect

We present some of the first science data with the new Keck/MOSFIRE instrument to test the effectiveness of different AGN/SF diagnostics at z {approx} 1.5. MOSFIRE spectra were obtained in three H-band multi-slit masks in the GOODS-S field, resulting in 2 hr exposures of 36 emission-line galaxies. We compare X-ray data with the traditional emission-line ratio diagnostics and the alternative mass-excitation and color-excitation diagrams, combining new MOSFIRE infrared data with previous HST/WFC3 infrared spectra (from the 3D-HST survey) and multiwavelength photometry. We demonstrate that a high [O III]/H{beta} ratio is insufficient as an active galactic nucleus (AGN) indicator at z > 1. For the four X-ray-detected galaxies, the classic diagnostics ([O III]/H{beta} versus [N II]/H{alpha} and [S II]/H{alpha}) remain consistent with X-ray AGN/SF classification. The X-ray data also suggest that 'composite' galaxies (with intermediate AGN/SF classification) host bona fide AGNs. Nearly {approx}2/3 of the z {approx} 1.5 emission-line galaxies have nuclear activity detected by either X-rays or the classic diagnostics. Compared to the X-ray and line ratio classifications, the mass-excitation method remains effective at z > 1, but we show that the color-excitation method requires a new calibration to successfully identify AGNs at these redshifts.

Trump, Jonathan R.; Barro, Guillermo; Koo, David C.; Faber, S. M. [University of California Observatories/Lick Observatory and Department of Astronomy and Astrophysics, University of California, Santa Cruz, CA 95064 (United States); Konidaris, Nicholas P. [Cahill Center for Astronomy and Astrophysics, California Institute of Technology, MC 105-24, 1200 East California Boulevard, Pasadena, CA 91125 (United States); Kocevski, Dale D.; Yan, Renbin [Department of Physics and Astronomy, University of Kentucky, Lexington, KY 40506 (United States); Juneau, Stephanie [Irfu/Service d'Astrophysique, CEA-Saclay, Orme des Merisiers, F-91191 Gif-sur-Yvette Cedex (France); Weiner, Benjamin J. [Steward Observatory, University of Arizona, 933 North Cherry Avenue, Tucson, AZ 85721 (United States); McLean, Ian S. [Department of Physics and Astronomy, UCLA, Los Angeles, CA 90095 (United States); Perez-Gonzalez, Pablo G.; Villar, Victor [Departamento de Astrofisica, Facultad de CC. Fisicas, Universidad Complutense de Madrid, E-28040 Madrid (Spain)

2013-01-20T23:59:59.000Z

158

Wind Tunnel and Flight Testing of Active Flow Control on a UAV  

E-Print Network (OSTI)

Active flow control has been extensively explored in wind tunnel studies but successful in-flight implementation of an active flow control technology still remains a challenge. This thesis presents implementation of active flow control technology...

Babbar, Yogesh

2011-08-08T23:59:59.000Z

159

Iodine Adsorption on Ion-Exchange Resins and Activated Carbons Batch Testing  

SciTech Connect

Iodine sorption onto seven resins and six carbon materials was evaluated using water from well 299-W19-36 on the Hanford Site. These materials were tested using a range of solution-to-solid ratios. The test results are as follows: The efficacy of the resin and granular activated carbon materials was less than predicted based on manufacturers performance data. It is hypothesized that this is due to the differences in speciation previously determined for Hanford groundwater. The sorption of iodine is affected by the iodine species in the source water. Iodine loading on resins using source water ranged from 1.47 to 1.70 g/g with the corresponding Kd values from 189.9 to 227.0 mL/g. The sorption values when the iodine is converted to iodide ranged from 2.75 to 5.90 g/g with the corresponding Kd values from 536.3 to 2979.6 mL/g. It is recommended that methods to convert iodine to iodide be investigated in fiscal year (FY) 2015. The chemicals used to convert iodine to iodate adversely affected the sorption of iodine onto the carbon materials. Using as-received source water, loading and Kd values ranged from 1.47 to 1.70 g/g and 189.8 to 226.3 mL/g respectively. After treatment, loading and Kd values could not be calculated because there was little change between the initial and final iodine concentration. It is recommended the cause of the decrease in iodine sorption be investigated in FY15. In direct support of CH2M HILL Plateau Remediation Company, Pacific Northwest National Laboratory has evaluated samples from within the 200W pump and treat bioreactors. As part of this analysis, pictures taken within the bioreactor reveal a precipitate that, based on physical properties and known aqueous chemistry, is hypothesized to be iron pyrite or chalcopyrite, which could affect iodine adsorption. It is recommended these materials be tested at different solution-to-solid ratios in FY15 to determine their effect on iodine sorption.

Parker, Kent E.; Golovich, Elizabeth C.; Wellman, Dawn M.

2014-09-30T23:59:59.000Z

160

Interactions between caffeine and cocaine in tests of motor activity: role of the adenosine A2 receptor  

E-Print Network (OSTI)

; Choi et al, 1988). However, doses of caffeine (50 to 100 uM) which markedly increase exploratory behavior are too low to effectively inhibit phosphodiesterase (Thithapandha et al. , 1972). Indeed, most potent phosphodiesterase inhibitors such as RO... measure of horizontal activity. For experiments 2 and 3 an automated Digiscan-16 system was used for the behavioral testing. The system included four optical beam activity monitors (Model E61-32; Coulbourn Instrs. , Inc. , Lehigh Valley, PA) comprised...

Snow, Steven Wayne

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

FROM: DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: DATE: TO: POLICY FLASH 2010-48 May 06,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Acquisition LetterIFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet Protocol Version 6 (IPv6) SUMMARY: ALIFAL 201 0-06 provides notice that the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council are issuing a final rule amending the Federal Acquisition Regulation (FAR) to require that Internet Protocol Version 6 (IPv6) compliant products be included in all new information technology (IT) acquisitions using Internet Protocol (IP). ALIFAL 2010-06, accordingly, updates the IPv6 guidance provided in AL-2006-04.

162

Summary of well-testing activities at Lawrence Berkeley Laboratory, 1975-1983  

SciTech Connect

Well test data collected from various geothermal fields by the geothermal group at Lawrence Berkeley Laboratory are presented. The type of well tests conducted, the instrumentation used and the data collected are described. Experience gained through interpretation of the data has helped identify problems in test procedures and interpretative methods.

Bodvarsson, M.G.; Benson, S.M.

1983-08-01T23:59:59.000Z

163

DATE: February 7, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy Memorandum DATE: July 8, 2011 Report Number: INS-L-11-02 REPLY TO ATTN OF: IG-40 (S10IS001) SUBJECT: Letter Report on "Implementation of Nuclear Weapons Quality Assurance Requirements at Los Alamos National Laboratory" TO: Manager, Los Alamos Site Office INTRODUCTION AND OBJECTIVE The National Nuclear Security Administration's (NNSA) Los Alamos National Laboratory (Los Alamos) is a multidisciplinary research and production institution responsible for the design and production of nuclear weapons components. In its effort to attain the highest quality in weapons engineering design and manufacturing, the Department of Energy

164

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

> POLICY FLASH 2010-25 DATE: TO: FROM: February 22,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 1.4 Establishing the Position of Source Evaluation Board (SEB) Secretariat and Knowledge Manager SUMMARY: As discussed at the December 2009 Procurement Directors' Meeting, a position titled "Source Evaluation Board (SEB) Secretariat and Knowledge Manager" has been established in the Acquisition Planning and Liaison Division, MA-621 Attached is the subject new DOE Acquisition Guide Chapter 1.4 which provides guidance on the establishment of the aforementioned position and the duties and responsibilities of the position.

165

ENERGY STAR Appliance Verification Testing - Pilot Program Summary...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3,...

166

Solar Energy Education. Humanities: activities and teacher's guide. Field test edition  

SciTech Connect

Activities are outlined to introduce students to information on solar energy while performing ordinary classroom work. In this teaching manual solar energy is integrated with the humanities. The activities include such things as stories, newspapers, writing assignments, and art and musical presentations all filled with energy related terms. An energy glossary is provided. (BCS)

Not Available

1982-01-01T23:59:59.000Z

167

MEMORANDUM TO: FILE, OH. 0 DATE  

Office of Legacy Management (LM)

FILE, OH. 0 DATE FILE, OH. 0 DATE d4, ------------------- FROM: b. x&,.& ---------S-----W SUBJECT: 1-3/;4*~ i&-h /LCL)&l&OAiOH h fi Q-cc& )2~see~ SITE NAME: ----fl eAd4 RQJ-cL ALTERNATE __-_-_---------------------------- NAME: ---------------------- CITY: -------------------------- STATE: B---m- OWNER(S) -------- Past: JAwd* ------------------------ Current: _------------------------- Owwr contacted 0 yes rno; if yes, date contacted B-m -----w-v TYPE OF OPERATION ----------------- pg Research t Development cl Facility Type 0 Production scale testing 0 Pilot Scale 0 Bench Scale Process 0 Theoretical Studies 0 Sample SC Analysie 0 Manufacturing 0 University 0 Research Organization 0 Government Sponsored Facility U Other ---------------------

168

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 ' July 7,20 1 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Notification of Employee Rights under the National Labor Relations Act SUMMARY: This Flash forwards a draft Federal Acquisition Regulation (FAR) clause, 52.222- 40, Notification of Employee Rights under the National Labor Relations Act. Executive Order (EO) 13496, Notification of Employee Rights under Federal Labor Laws, dated January 30,2009, requires contractors and subcontractors to post a notice that informs employees of their rights under Federal labor laws, including the National Labor Relations Act. This Act encourages collective bargaining and protects the exercise by workers of their freedom

169

Issuance Date:: February  

Office of Legacy Management (LM)

Issuance Issuance Date:: February 11, 1966 POST-SHOT HYDROLOGI C SAFETY 68296 VUF-1014 FINAL REPORT FALLON, NEVADA OCTOBER 26, 1963 Hazleton-Nuclear Science Corporation October 30, 1965 SPONSORED BY THE ADVANCED RESEARCH PROJECTS AGENCY OF THE DEPARTMENT OF DEFENSE AND THE U. S.ATOMIC ENERGY COMMISSION VELA UNIFORM PROJECT LEG A L NOTICE This report was prepared as an account of Government sponsored work. Neither the United States, nor the Commission, nor any person acting on behalf of the Commission: A. Makes any warranty or representation, expressed or implied, with respect to the accu- racy, completeness, or usefulness of the information contained in this report, or that the use of any information. apparatus, method, or process disclosed in this report may not infringe privately owned rights; or B. Assumes any liabilities with respect to the use of, or for damages resulting from the

170

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

171

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-7' -7' August 20,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements SUMMARY: The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014,

172

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1,2008 1 1,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBTECT: Past Performance Data SIJMMARY: Beginning October 01,2008, all contractor past performance data shall be submitted through the Department of Defense (DoD) Contractor Performance Assessment Reporting System (CPARS) at htt~://www.c~ars.csd.disa.mil/cr>arsmain.htm. Thus, the Department will no longer use the National Institute of Health (NIH) Contractor Performance System (CPS). To ensure all Contracting Officers understand how to use this new system, Web Cast Training has been scheduled for the following dates and times: October 8- 1:30-430 including construction and A/E training during the last hour November 6- 1:30-4:30 including construction and A/E training during the last hour

173

DATE: REPLY TO  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 (NW ed States Governhent ilmemorandum DATE: REPLY TO ' bPfl29 1993 Al-fN OF: EM-421 (W. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Associate Aircraft Site, Fairfield, Ohio TO: Manager, DOE Oak Ridge Field Office This is to notify you that the Former Associated Aircraft Site in Fairfield, Ohio, is designated,for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). This notification does not constitute a FUSRAP baseline change control approval. Approval of the baseline change will be accomplished through the normal change control procedures. The site was used by the former Atomic Energy Commission for the machining and shaping of uranium metal during the 1950s. A radiological survey

174

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: TO: FROM: SUBJECT: - - -- . POLICY FLASH 2005-18 February 14, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management Small Business Contracting Policy Update SUMMARY: This Policy Flash forwards (1) information on locating Service-Disabled Veteran-Owned Small Business (SDVOSBs) and (2) a solicitation provision which provides guidance to prospective offerors on the impact of teaming arrangements on their small business status. 1 -- -- --------- 1. To locate SDVOSBs, you can go to the Department of Veteran Affairs' website for the Center for Veterans Enterprise site at http://www.vetbiz.gov/default2.htm. From that site you can link to the "Search for a Business" at http://vip.vetbiz.gov/search/default.asp to find SDVQSBs. 2. The following provision is recommended for solicitations

175

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-08 POLICY FLASH 2010-08 DATE: TO: FROM: October 28,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Amendment to Extend the Partnership Agreement between the U.S. Small Business Administration (SBA) and the Department of Energy (DOE) SUMMARY: The purpose of this flash is to advise you that an amendment was issued pursuant to Section VII of the Partnership Agreement (PA) between the SBA and the DOE. The amendment extends the current PA until November 30,2009. All other terms and conditions of the PA remain unchanged. This flash and its attachment will be available online at the following website: http://mana~ement.enerm.nov/policy nuidancelpolicy flashes.htm.

176

Release Date: April 2010  

Gasoline and Diesel Fuel Update (EIA)

April 2010 DOE/EIA-0121 (2009/04Q) April 2010 DOE/EIA-0121 (2009/04Q) Next Release Date: June 2010 Quarterly Coal Report October - December 2009 April 2010 U.S. Energy Information Administration Office of Coal, Nuclear, Electric, and Alternate Fuels U.S. Department of Energy Washington, DC 20585 _____________________________________________________________________________ This report is available on the Web at: http://www.eia.doe.gov/cneaf/coal/quarterly/qcr.pdf _____________________________________________ This report was prepared by the U.S. Energy Information Administration (EIA), the independent statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this

177

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: March 25,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Rescind Policy Flashes 201 0-04 "Cease All Funding of the Association of Community Organizations for Reform Now (ACORN)" and 201 0-06 "Additional Documentation Regarding Policy Flash Number 201 0-04" SUMMARY: The purpose of this flash to inform you that on March 10,201 0, the United States District Court for the Eastern District of New York issued an opinion regarding ACORN. In its opinion, the District Court concluded that the funding prohibitions regarding ACORN and related entities in FY 201 0 Continuing Resolution and in several of FY 201 0 appropriations acts

178

Date: Re: Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

~ ~ ~~ Date: Re: Department of Energy Washington, DC 20585 April 5, 2007 TRADEMARK l APPLICATION AND LICENSING PROCEDURES, IPI Trademarks may be used by DOE or its contractors for identification of goods and services and serve as an intellectual property tool to enhance technology transfer. Registration in the PTO also helps to ensure that marks closely associated with DOE are not debased or devalued, and also helps to protect the public from those who may use marks closely associated with DOE to suggest "goods or services" are authorized by DOE. This IPI contains guidance on trademarks once the decision has been made to use a particular mark in commerce and obtain protection therefor. This IPI does not contain guidance as to when, in the first instance, a mark should be coined for association with a particular good/service, except at B.4 with respect to use of DOE as part of a mark.

179

J DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ICY FLASH 2010-5- - ICY FLASH 2010-5- - J DATE: TO: FROM: June 10,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE Acquisition Guide Chapter 13 Policy and Operating Procedures for Use of the GSA Smartpay2 Purchase Card SUMMARY: Attached for your information is an updated and revised copy of DOE Acquisition Guide Chapter 13, Purchase Card Policy and Operating Procedures. This Flash and its attachment will be posted online, at the following website: http:llwww.mananement.enerliy.gov/~olicy guidance/policy flashes.htm. Questions concerning this policy flash should be directed to Denise Clarke at (202) 287-1 748 or DeniseT.Clarke@,hq.doe.~ov . Director Office of Procurement and

180

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 December 16,2009 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2005-38 SUMMARY: Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. Item I11 - Internet Protocol Version 6 (IPv6) (FAR Case 2005-041) - The Acquisition Letter 2006-04, Acquiring Information Technology - Requirement to Comply with Internet Protocol Version 6, dated December 14,2005, is being reviewed to determine if

182

LSPE SAFE/ ARM SLIDE DATE 28 March 197  

E-Print Network (OSTI)

: ..'; I ~ ··,~ ' . LSPE SAFE/ ARM SLIDE NO. ATM-1088 REV. NO. PAGE OF- DATE 28 March 197 FAILURE/ ARM SLIDE FAILURE EVALUATION REPORT TABLE OF CONTENTS PURPOSE BACKGROUND DESCRIPTION OF FAILURE with Slides Having PAGI i DATE 0, Page 1 1 3 3 3 12 15 16 Larger Fillet Radius 16 6. 2 Slide Tests With 10

Rathbun, Julie A.

183

U.S. Department of Energy FreedomCAR & Vehicle Technologies Program Advanced Vehicle Testing Activity, Hydrogen/CNG Blended Fuels Performance Testing in a Ford F-150  

SciTech Connect

Federal regulation requires energy companies and government entities to utilize alternative fuels in their vehicle fleets. To meet this need, several automobile manufacturers are producing compressed natural gas (CNG)-fueled vehicles. In addition, several converters are modifying gasoline-fueled vehicles to operate on both gasoline and CNG (Bifuel). Because of the availability of CNG vehicles, many energy company and government fleets have adopted CNG as their principle alternative fuel for transportation. Meanwhile, recent research has shown that blending hydrogen with CNG (HCNG) can reduce emissions from CNG vehicles. However, blending hydrogen with CNG (and performing no other vehicle modifications) reduces engine power output, due to the lower volumetric energy density of hydrogen in relation to CNG. Arizona Public Service (APS) and the U.S. Department of Energys Advanced Vehicle Testing Activity (DOE AVTA) identified the need to determine the magnitude of these effects and their impact on the viability of using HCNG in existing CNG vehicles. To quantify the effects of using various blended fuels, a work plan was designed to test the acceleration, range, and exhaust emissions of a Ford F-150 pickup truck operating on 100% CNG and blends of 15 and 30% HCNG. This report presents the results of this testing conducted during May and June 2003 by Electric Transportation Applications (Task 4.10, DOE AVTA Cooperative Agreement DEFC36- 00ID-13859).

James E. Francfort

2003-11-01T23:59:59.000Z

184

Corrective Action Investigation Plan for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada (Rev. No.: 0) includes Record of Technical Change No. 1 (dated 9/17/2002)  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 5 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 5 consists of eight Corrective Action Sites (CASs): 05-15-01, Sanitary Landfill; 05-16-01, Landfill; 06-08-01, Landfill; 06-15-02, Sanitary Landfill; 06-15-03, Sanitary Landfill; 12-15-01, Sanitary Landfill; 20-15-01, Landfill; 23-15-03, Disposal Site. Located between Areas 5, 6, 12, 20, and 23 of the Nevada Test Site (NTS), CAU 5 consists of unlined landfills used in support of disposal operations between 1952 and 1992. Large volumes of solid waste were produced from the projects which used the CAU 5 landfills. Waste disposed in these landfills may be present without appropriate controls (i.e., use restrictions, adequate cover) and hazardous and/or radioactive constituents may be present at concentrations and locations that could potentially pose a threat to human health and/or the environment. During the 1992 to 1995 time frame, the NTS was used for various research and development projects including nuclear weapons testing. Instead of managing solid waste at one or two disposal sites, the practice on the NTS was to dispose of solid waste in the vicinity of the project. A review of historical documentation, process knowledge, personal interviews, and inferred activities associated with this CAU identified the following as potential contaminants of concern: volatile organic compounds, semivolatile organic compounds, polychlorinated biphenyls, pesticides, petroleum hydrocarbons (diesel- and gasoline-range organics), Resource Conservation and Recovery Act Metals, plus nickel and zinc. A two-phase approach has been selected to collect information and generate data to satisfy needed resolution criteria and resolve the decision statements. Phase I will concentrate on geophysical surveys to confirm the presence or absence of disposed waste within a CAS and verify the boundaries of disposal areas; penetrate disposal feature covers via excavation and/or drilling; perform geodetic surveys; and be used to collect both soil and environmental samples for laboratory analyses. Phase II will deal only with those CASs where a contaminant of concern has been identified. This phase will involve the collection of additional soil and/or environmental samples for laboratory analyses. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

IT Corporation, Las Vegas, NV

2002-05-28T23:59:59.000Z

185

Power Performance Testing Activities in the DOE-EPRI Turbine Verification Program  

SciTech Connect

As part of the US Department of Energy/Electric Power Research Institute (DOE-EPRI) Wind Turbine Verification Program, Global Energy Concepts (GEC) is engaged in planning and conducting power performance tests for wind turbines in Searsburg, Vermont; Glenmore, Wisconsin; Algona, Iowa; Springview, Nebraska; Kotzebue, Alaska; and Big Spring, Texas. The turbines under investigation include a 550-kW Zond Z-40 FS, a 600-kW Tacke 600e, two 750-kW Zond Z-50s, a 66-kW AOC 15/50, a 660-kW Vestas V-47, and a 1.65-MW Vestas V-66. The testing is performed in a variety of terrain types, including mountains, plains, deserts, and coastal tundra; and under a wide range of atmospheric conditions from arid to arctic. Because one goal of this testing program is to gain experience with the new International Electrotechnical Commission (IEC) 61400-12 standard, all of the measurements are being performed in accordance with this new standard. This paper presents the status of the power performance testing at each site, the methodologies employed, test results available, and lessons learned from the application of the IEC standard. Any sources of uncertainty are discussed, and attention is given to the relative importance of each aspect of the IEC standard in terms of its contribution to the overall measurement uncertainty.

VandenBosche, J.; McCoy, T.; Rhoads, H. (Global Energy Concepts, LLC); McNiff, B. (McNiff Light Industry); Smith, B. (National Renewable Energy Laboratory)

2000-09-11T23:59:59.000Z

186

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network (OSTI)

2014 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification Archery

Williams, Gary A.

187

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network (OSTI)

2012 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of 0 (no knowledge) to 3_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Grether, Gregory

188

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date  

E-Print Network (OSTI)

2013 BRUIN WOODS SUMMER STAFF APPLICATION Name Birth Date School Address Home Address Phone # ( ) E, Activities and Awards SKILLS, CERTIFICATES & QUALIFICATIONS CAMP SKILLS: On a scale of "0" (no knowledge_____________________________________________________________________________ CERTIFICATIONS (List expiration dates and certifying organizations) Lifeguard Boating Certification NRA Riflery

Williams, Gary A.

189

Paleomagnetic Secular Variation (PSV), 137Cs, and Hg dating techniques  

E-Print Network (OSTI)

Portland State University Department of Geology #12;Hg-Mercury contamination dating http fission of Uranium-235 · Due to nuclear weapons testing · Highly water soluble (spreads quickly) · Half

Fountain, Andrew G.

190

Modeling and Field Test Planning Activities in Support of Disposal of Heat-Generating Waste in Salt  

SciTech Connect

The modeling efforts in support of the field test planning conducted at LBNL leverage on recent developments of tools for modeling coupled thermal-hydrological-mechanical-chemical (THMC) processes in salt and their effect on brine migration at high temperatures. This work includes development related to, and implementation of, essential capabilities, as well as testing the model against relevant information and published experimental data related to the fate and transport of water. These are modeling capabilities that will be suitable for assisting in the design of field experiment, especially related to multiphase flow processes coupled with mechanical deformations, at high temperature. In this report, we first examine previous generic repository modeling results, focusing on the first 20 years to investigate the expected evolution of the different processes that could be monitored in a full-scale heater experiment, and then present new results from ongoing modeling of the Thermal Simulation for Drift Emplacement (TSDE) experiment, a heater experiment on the in-drift emplacement concept at the Asse Mine, Germany, and provide an update on the ongoing model developments for modeling brine migration. LBNL also supported field test planning activities via contributions to and technical review of framework documents and test plans, as well as participation in workshops associated with field test planning.

Rutqvist, Jonny; Blanco Martin, Laura; Mukhopadhyay, Sumit; Houseworth, Jim; Birkholzer, Jens

2014-09-26T23:59:59.000Z

191

Solar Energy Education. Social studies: activities and teacher's guide. Field test edition  

SciTech Connect

Solar energy information is made available to students through classroom instruction by way of the Solar Energy Education teaching manuals. In this manual solar energy, as well as other energy sources like wind power, is introduced by performing school activities in the area of social studies. A glossary of energy related terms is included. (BCS)

Not Available

1982-01-01T23:59:59.000Z

192

Testing for Trend in North Atlantic Hurricane Activity, 190098  

Science Journals Connector (OSTI)

The detection of a trend in hurricane activity in the North Atlantic basin has been restricted by the incompleteness of the record prior to 1946. In an earlier paper, the complete record of U.S. landfalling hurricanes was used to extend the ...

Andrew R. Solow; Laura J. Moore

2002-11-01T23:59:59.000Z

193

STUDENT RECREATION CENTER FACILITY REQUEST Group Name: ____________________________ Today's Date: __________  

E-Print Network (OSTI)

STUDENT RECREATION CENTER FACILITY REQUEST � Group Name: ____________________________ Today's Date:____________________ Time of Event: Start ______ Finish ______ � Facility Requested: o Lockridge Arena ____ Recreational Gym. _______________________________________________________________________________________________________ ________________________________________________________________________________________________________ By requesting the Colorado School of Mines Student Recreation Center, I acknowledge that the requested activity

194

Type Policy Title Here Effective Date: [Insert Date  

E-Print Network (OSTI)

Type Policy Title Here Effective Date: [Insert Date] Policy Statement [Type Statement Text Here] Reason(s) for the Policy [Type Reason Text Here] Primary Guidance to Which This Policy Responds [Type Primary Policy Here ­ If there is NOT a Primary Policy indicate that] Responsible University Office

Salzman, Daniel

195

Absolute Time Radiometric Dating: the source of the dates on  

E-Print Network (OSTI)

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale Radiometric.g. uranium to lead. · The parent element is radioactive, the daughter element is stable. · The decay rate nucleosynthesis. Common Radioactive Elements, Parents and Daughters · Carbon-14, C14 Nitrogen-14, N14 · Uranium

Kammer, Thomas

196

Final Report - Effects of High Spinel and Chromium Oxide Crystal Contents on Simulated HLW Vitrification in DM100 Melter Tests, VSL-09R1520-1, Rev. 0, dated 6/22/09  

SciTech Connect

The principal objective of the work was to evaluate the effects of spinel and chromium oxide particles on WTP HLW melter operations and potential impacts on melter life. This was accomplished through a combination of crucible-scale tests, settling and rheological tests, and tests on the DM100 melter system. Crucible testing was designed to develop and identify HLW glass compositions with high waste loadings that exhibit formation of crystalline spinel and/or chromium oxide phases up to relatively high crystal contents (i.e., > 1 vol%). Characterization of crystal settling and the effects on melt rheology was performed on the HLW glass formulations. Appropriate candidate HLW glass formulations were selected, based on characterization results, to support subsequent melter tests. In the present work, crucible melts were formulated that exhibit up to about 4.4 vol% crystallization.

Kruger, Albert A.; Matlack, K. S.; Kot, W.; Pegg, I. L.; Chaudhuri, M.; Lutze, W.

2013-11-13T23:59:59.000Z

197

Conference dates 1620 April 2012  

E-Print Network (OSTI)

Conference dates 16­20 April 2012 Location The Square Conference Centre Brussels, Belgium www/nanotechnologies Mark your Calendar #12;Conference dates 16­20 April 2012 The Square Conference Centre Brussels, Belgium success, Photonics Europe 2012 will again feature choice conferences and plenary presentations

Jahns, Jürgen

198

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

175 175 July 30,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Security Clause, DEAR 952.204-2 SUMMARY: The DOE Security Clause, DEAR 952.204-2, was amended on May 18, 2009 to augment the background check requirement and to add a drug test requirement as prerequisites for processing a request for an access authorization (security clearance). Please check to ensure that all applicable contracts have been amended to include these updated requirements. Expect personnel security to return contractor requests for access authorizations that do not include the required information. A summary of the required information is attached. This Flash and its attachment will be available online within a day, at the following

199

DATE: TO: FROM: L  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

l l - ~ A c. POLICY FLASH 2010-7 August 05,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: RFP Section L Attachment Templates SUMMARY: On March 29,2010, six draft RFP Section L Attachment templates (Past Performance Information Questionnaire, Past Performance Questionnaire Cover Letter, Letter of Commitment, Past Performance Reference Information Form, ESH&Q Past Performance Information Form, and Resume Format) were distributed for Procurement Director (PD) and Head of Contracting Activity (HCA) review and comment. All comments received were considered and changes were made as appropriate. The final versions of the six aforementioned RFP Section L Attachment templates will be e-mailed directly to the Procurement Directors and

200

DATE: TO: FROM:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . POLICY FLASH 2010-616 July 8,201 0 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Single Audit Act Initiatives by the Office of Risk Management, Office of the Chief Financial Officer Activities SUMMARY: This Flash forwards a memorandum from the Chief Financial Officer on new initiatives relating to the Single Audit Act and Office of Management and Budget Circular A-1 33. The Office of Risk Management will provide services to assist DOE'S acquisition and financial assistance personnel in the review and use of audits performed under the Act and Circular. This Policy Flash will be available online at the following website: http:l/mananement.ener~.~ov/_~olic~ miidancel~olic~ flashes.htm.

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

DATE: TO: FROM: SUBJECT:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 .- POLICY FLASH 2010-62 1 July 1,2010 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management Revised DOE Acquisition Guide Chapter 7 1.1 Headquarters Business Clearance Process SUMMARY: There was mention in the National Academy of Public Administration (NAPA) report titled "Managing at the Speed of Light - Improving Mission Support Performance" that Departmental procurement personnel don't understand the Business Clearance (BC) process. In an effort to address this issue, each Procurement Director (PD) and Head of Contracting Activity (HCA) was ask to review Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process and identify anything that was unclear, as well as recommend changes or ideas which

202

Post?installation activities in the Comprehensive Nuclear Test Ban Treaty (CTBT) International Monitoring System (IMS) infrasound network  

Science Journals Connector (OSTI)

The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear?Test?Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network to repair faulty equipment and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently 11 of the 60 IMS infrasound stations are transmitting data in the post?installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post?certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post?installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost?efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations as well as Configuration Management and Network Sustainment.

2002-01-01T23:59:59.000Z

203

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and posted 2/10/2011 and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next 12 Months Department of Energy (DOE) Savannah River Site (SRS) Jan-11 Estimated Schedule (**NEPA Milestones) South Carolina Department of Health and Environmental Control (SCDHEC) issued a National Pollutant Discharge Elimination System (NPDES) Industrial Stormwater General Permit (IGP) # SCR000000 November 12, with an effective date of January

204

Injectivity Test At Raft River Geothermal Area (1979) | Open Energy  

Open Energy Info (EERE)

Injectivity Test At Raft River Geothermal Area (1979) Injectivity Test At Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Injectivity Test Activity Date 1979 Usefulness useful DOE-funding Unknown Notes Quantification of the pressure response prior to 600 minutes is not always possible. Short-duration (< 24-hour) injection or pump tests are conducted with the drilling rig equipment, and long-duration (21-day) injection and pump tests are then conducted with the permanent pumping facilities. References Allman, D. W.; Goldman, D.; Niemi, W. L. (1 January 1979) Evaluation of testing and reservoir parameters in geothermal wells at Raft

205

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

7/30/2013 7/30/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Alt Fuel- CNG Vehicle Dynamometer Input 2012 Honda Civic GX Test Cell Location Front Advanced Powertrain Research Facility Document Date 7/30/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3192 Test Fuel Information MPGe derived by EPA calculation methods Revision Number 1 Notes: Test weight [lb] Target A [lb] 3192 22.2037 Target B [lb/mph] Target C [lb/mph^2] 0.45855 0.01263 Test Fuel Information MPGe derived by EPA calculation methods Fuel type Compressed Natural Gas (CNG) MPGe derived by EPA calculation methods Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.5872 905.3 Fuel type Compressed Natural Gas (CNG) T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t

206

Advanced Powertrain Research Facility Document Date  

NLE Websites -- All DOE Office Websites (Extended Search)

10/18/2013 10/18/2013 Vehicle Setup Information Downloadable Dynamometer Database (D 3 )- Test Summary Sheet Vehicle Architecture Conventional Vehicle Dynamometer Input 2013 Volkswagen Jetta TDI Test Cell Location Front Advanced Powertrain Research Facility Document Date 10/18/2013 Revision Number 1 Vehicle Dynamometer Input Test weight [lb] 3516 Test Fuel Information Revision Number 1 Notes: Test weight [lb] Target A [lb] 3516 30.1456 Target B [lb/mph] Target C [lb/mph^2] 0.37653 0.015662 Test Fuel Information Fuel type 2007 Certification Diesel HF0583 Fuel density [g/ml] Fuel Net HV [BTU/lbm] 0.855 18355 Fuel type 2007 Certification Diesel HF0583 T e s t I D [ # ] C y c l e C o l d s t a r t ( C S t ) H o t s t a r t [ H S t ] D a t e T e s t C e l l T e m p [ C ] T e s t C e l l R H [ % ] T e s t C e l l B a r o [ i n / H g ] V e h i c l e c o o l i n g f a n s p e e d : S p e e d M a t

207

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to  

E-Print Network (OSTI)

TESTING FORM Please deliver exams with envelope & testing form at least 24 hours in advance to: _________________________________ Class Time: __________ - __________ _________ Test Date: _______________________________ Time allotted): ____________________________ INSTRUCTOR PROCEDURES: 1. Please deliver tests to WYLY TOWER 318 at least 24 hours PRIOR to test time

Selmic, Sandra

208

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 Request for Pre-Applications 12 Request for Pre-Applications Workscope Descriptions FY 2012 Request for Pre-Applications PROGRAM SUPPORTING: FUEL CYCLE R&D SEPARATIONS AND WASTE FORMS (F E DE R A L POC - J I M B R E SE E & T E C H NI C A L POC - T E R R Y T ODD) Separations and Waste Forms (FC-1) - The separations and waste forms campaign develops the next generation of fuel cycle and waste management technologies that enable a sustainable fuel cycle, with minimal processing, waste generation, and potential for material diversion. Today's technology challenges include the economical recovery of transuranic elements for recycle/transmutation; and minimizing waste generation (including both high level and low level waste). Priority research efforts revolve around achieving near-zero radioactive off-gas emissions; developing a simplified, single-step

209

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: INL - Off-Road ATV Use In Support of Engineering Surveys SECTION B. Project Description The proposed action will allow for off-road ATV use near T-24 and T-25 at the Idaho National Laboratory Site. The ATV(s) will be used to survey in support of engineering design for a proposed upgraded haul road within the INL Site. Currently, an Environmental Assessment is being prepared to address upgrading either T-24 or T-25 to establish a site transportation route for the out-of-commerce shipment of materials and wastes from MFC to other site areas to reduce U.S. Highway 20 road closures, improve safety, and reduce cost. Since off-road use of motorized vehicles is prohibited unless approval is obtained, this Environmental Checklist will document that

210

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MEASUREMENT SENSITIVE DOE G 440.2B-1A 9-19-05 IMPLEMENTATION GUIDE AVIATION PROGRAM PERFORMANCE INDICATORS (METRICS) for use with DOE O 440.2B, Aviation Management and Safety [This Guide describes suggested nonmandatory approaches for meeting requirements. Guides are not requirements documents and may not be construed as requirements in any audit or appraisal for compliance with the parent Policy, Order, Notice, or Manual.] U.S. Department of Energy Washington, D.C. 20585 AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Aviation Management/OMBE/CFO DOE G 440.2B-1A i (and ii) 9-19-05 FOREWORD This Department of Energy (DOE) Aviation Program performance indicators interim guide is approved by the Office of Aviation Management (OAM) and is available for use by all DOE and

211

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16 16 SECTION A. Project Title: GaRDS Vehicle X-Ray System Procurement, Installation and Operations SECTION B. Project Description: . This effort will be to procure, install, and operate a Gamma Radiation Detection System (GaRDS) capable of providing X-Ray images of incoming vehicles and delivery trucks. The scanner will be equipped with a 1 Ci Cobalt-60 gamma source and will be installed in building MFC-736. This security building is located on Taylor Blvd approximately one mile south of the Materials and Fuels Complex (MFC) and already houses a Vehicle Explosives Detection System equipped with two 50 microgram Cf-252 sources. The purpose of the proposed detection system is to enhance the security capability for MFC facilities, research programs, and personnel.

212

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 SECTION A. Project Title: MFC Dial Room Replacement Project SECTION B. Project Description: The proposed project is to construct and operate a new dial room at the Materials and Fuels Complex (MFC) to continue operation of the telecommunications system at the Idaho National Laboratory (INL). As part of the INL Private Branch Exchange (PBX) consolidation effort, the need to replace Central Facilities Area (CFA), Radioactive Waste Management Complex (RWMC), and Power Burst Facility (PBF) PBX switches will eliminate the current switches potential failure and provide the necessary maintainable hardware and software to support INL missions. The project will maintain the existing dial room in the basement of MFC-752 as a splice/conduit/equipment

213

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 SECTION A. Project Title: CFA-696 Power and Plumbing Upgrades SECTION B. Project Description: There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area (CFA) Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30A power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network (LAN) cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability as itemized below:

214

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

215

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

216

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

217

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

218

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

10-009 10-009 SECTION A. Project Title Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project SECTION B. Project Description: This project increases the Uninterrupted Power Supply (UPS) capacity in the IF-608 Information Operations and Research Center (IORC) by removing two existing UPS systems (50 KVA and 36 KVA) and installing a 225 KVA system. A ~15 ton cooling unit will be installed on the roof for heat removal. Associated work will include additional electrical panel(s) and electrical conduit rerouting and installation. Disposal of the existing UPS systems may be required depending on whether they are claimed off the excess list. This work will be performed either under blanket subcontracts or by a separate construction contractor and is planned for completion by

219

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 SECTION A. Project Title: TRA-609 Compressed Air System Drain Line Modification and Valve Replacement SECTION B. Project Description: Due to periods of insufficient water flow to the sewer ponds, the clay liners in the ponds can dry out and crack. This proposed action is to add an additional drain line, which will allow clean well water that has been used to cool compressors to then be drained into the sewer system ponds during low flow periods in order to maintain a higher, more consistent water level. There are no chemicals added to the water. This project will replace the 1.5" compressor oil cooling water solenoid valves with ball valves on M-6, M-7 and M-8; replace the 2" compressor oil and air cooling system flow control valves on M-6, M-8 and M-9; install a new check valve in the compressed air system auxiliary compressor line; install a drain line

220

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 SECTION A. Project Title: Reactor Power Up Rate, Compressor Replacement, Neutron Radiography Restore, Liquid Scintillation Counter - Texas A&M University SECTION B. Project Description Texas A&M will replace an existing 54-year old compressor to improve reliability of the reactor operation and purchase a liquid scintillator counter to give the facility the ability to perform tritium analysis. Additionally, under NRC License R-83, Texas A&M will up rate the reactor power from 1MW to 1.5 MW and purchase equipment to restore capability to perform Neutron Radiography. SECTION C. Environmental Aspects / Potential Sources of Impact Radioactive Material Use - To calibrate the liquid scintillator, radioactive standards are used. Procedures are in place to handle.

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

222

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX Posting No.: DOE-ID-INL-10-008 CX Posting No.: DOE-ID-INL-10-008 SECTION A. Project Title: Maintenance and Modification of Well TRA-08 SECTION B. Project Description: TRA-08, a groundwater monitoring well located approximately 1.5 miles south of the ATR Complex was drilled and constructed in 1990. The well is currently used as a groundwater monitoring compliance point for the ATR Complex Cold Waste Pond Industrial Wastewater Reuse Permit (IWRP). It is also used for CERCLA groundwater monitoring by CWI. Over the life of the well, corrosion of the carbon steel casing has resulted in an accumulation of rust flakes in the bottom of the well thus adversely affecting the efficiency of the well. In addition, the water level in the well has dropped from a depth of approximately 477 ft below ground surface at

223

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 CX Posting No.: DOE-ID-ICP-12-005 SECTION A. Project Title: INTEC - U-233 Waste Stream Disposition SECTION B. Project Description The proposed action will transfer 171 drums of U-233 waste from the Advanced Mixed Waste Treatment Project (AMWTP) to INTEC for verification, treatment, and repackaging for final disposition at the Nevada National Security Site (NNSS). The U233 drums are a portion of waste historically managed as transuranic as part of the 1995 Idaho Settlement Agreement.The waste management actions will be performed in CPP-659 or the Radioactive Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233/Th-232 contaminated materials (minor amounts of enriched, depleted and natural powders) generated in the 1970's during development of a

224

Date:  

Office of Legacy Management (LM)

1.45 10.06 0.99 0.04786 2.85 0.13 1.30 Froude Number Flow Type Notes Messages 0.66 Subcritical 0.64 Subcritical 0.41 Subcritical 0.58 Subcritical 0.48 Subcritical 0.42...

225

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

understand what is required to be a nuclear supplier. 6. Gen IV Fabrication Centric Roadmap The objective of this program is to develop a succinct document that will allow...

226

Date  

NLE Websites -- All DOE Office Websites (Extended Search)

that Sandia contracts are settled for a reasonable amount and that no instances of fraud related to these contracts is apparent. We will not report on the adequacy of your...

227

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

2 E-2 IWFDP Volume 1 (Process Strategy) provides the basis for how the double-shell tanks (DST) will be used to stage and deliver waste feed to the WTP. This volume provides an...

228

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

of approximately 55 Mgal 1 of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The Hanford Federal Facility...

229

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

operations (such as preparation of chemical standards and sample analysis); and small-scale pilot projects (generally less than 2 years) frequently conducted to verify a...

230

DATE:  

Office of Legacy Management (LM)

(w 39 fusrap6 I FROM: Ed Mitchellzm SUBJECT: Elimination Recommendation for American Machine and Foundry in New York City The purpose of this note is to provide the following...

231

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

Release; Further Dissemination Unlimited By Janis D. Aardal at 1:25 pm, Jan 31, 2013 DOERL-2001-41 Revision 6 SITEWIDE INSTITUTIONAL CONTROLS PLAN FOR HANFORD CERCLA RESPONSE...

232

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

buildings"..., and Overarching EC INL-05-002 "Critical Infrastructure Protection (CIP) Program ... Justification: Removal of the interior walls and mezzanines will be a...

233

DATE:  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Corporations Section 743 Any Payment for the Election for a Federal Office or to a Political Committee Section 3003 Reporting on Conference Spending 2 The FAL addresses the...

234

DATE:  

Energy Savers (EERE)

Corporations * Section 735 Any Payment for the Election for a Federal Office or to a Political Committee * Section 742 Reporting on Conference Spending The FAL addresses the...

235

DATE:  

Energy Savers (EERE)

Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement...

236

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

will rest on a new concrete foundation and house the necessary heating, ventilation and air conditioning (HVAC), electrical, life safety and communications systems but will not...

237

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Mixed Waste Staging Facility (CPP-1617). The bulk of the U-233 waste is from the Bettis Atomic Power Laboratory and consists of U-233Th-232 contaminated materials (minor...

238

DATE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Appropriations Act, 2014, Pub. L. No. 113-76. SUMMARY: Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 provides implementing...

239

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

Building The INL must operate and maintain infrastructure and facilities to support the nuclear energy research, development, demonstration, and commercial application programs,...

240

DATE:  

NLE Websites -- All DOE Office Websites (Extended Search)

es...A-i Appendix B Estimation of Selected Single-Shell Tank Heat Generation Rates...B-i RPP-RPT-54981, Revision 0 ii List of...

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DATE:  

Office of Environmental Management (EM)

has been revised. The subject form has been posted on the DOE Financial Assistance web page on the Recipients Page under the Financial Assistance Forms and Information for...

242

DATE  

NLE Websites -- All DOE Office Websites (Extended Search)

A. Project Title: Innovative Manufacturing Process for Improving the ErosionCorrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing...

243

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 SECTION A. Project Title: Nuclear Fabrication Consortium SECTION B. Project Description The mission of the NFC will be accomplished through both public and private funding. The list below outlines the programs that have identified for initiation under the initial DOE funding. Additional programs are envisioned and will be proposed, subject to any applicable budget constraints, to DOE-NE as they become known to EWI, the NFC, and DOE. 1. Automation of Advanced Non-Destructive Evaluation (NDE) Technologies The objective of the first phase of this project is to improve the reliability of NDE methods by increasing the automation content. 2. Advanced Laser Technology The objective is to identify laser applications that offer significant productivity gains over the current processes being used, and

244

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 __________________________ 1 DOE's strategic plans included the Nuclear Energy Research and Development Roadmap" (2010 Predecisional draft) and reports such as "Facilities for the Future of Nuclear Energy Research: A Twenty-year Outlook". SECTION A. Project Title: Materials and Fuel Complex (MFC) Infrastructure Upgrades: Sewage Lagoons Upgrades SECTION B. Project Description: MFC Infrastructure Upgrades - MFC Sewage Lagoon Upgrades This EC focuses on upgrades to the existing 2.4 acre evaporative sewage lagoons, located north-east and outside of the MFC fenced area. These existing lagoons are currently at capacity with the approximately 800 personnel based at MFC. The number of researchers and operations

245

DATE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 SECTION A. Project Title: Replace 200,000 Gallon Water Storage Tank at MFC SECTION B. Project Description: The project is to replace the current 200,000 gallon potable water tank at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) with a new 300,000 gallon water tank. The existing tank and foundation will be removed and the waste materials managed and disposed under the direction of Waste Generator Services (WGS). The installation area for the new tank will be excavated and the new tank put in place. The new tank will be connected to the existing water system and will be coated on both exterior and interior surfaces to prevent corrosion. All valves and lines will be closed off to the construction area until the new tank is in place and the valves reconnected.

246

Verification Testing Test Driven Development Testing with JUnit Verification  

E-Print Network (OSTI)

Verification Testing Test Driven Development Testing with JUnit Verification Any activity should be verified. #12;Verification Testing Test Driven Development Testing with JUnit Approaches to verification 1 Testing 2 Static Analysis · Peer review · Insepction/Walk-through/Structured review · Formal

Peters, Dennis

247

LABORATORY OPTIMIZATION TESTS OF TECHNETIUM DECONTAMINATION OF HANFORD WASTE TREATMENT PLANT LOW ACTIVITY WASTE OFF-GAS CONDENSATE SIMULANT  

SciTech Connect

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Off-Gas Condensate) from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of glass waste. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the potential treatment of this stream to remove radionuclides and subsequently disposition the decontaminated stream elsewhere, such as the Effluent Treatment Facility (ETF), for example. The treatment process envisioned is very similar to that used for the Actinide Removal Process (ARP) that has been operating for years at the Savannah River Site (SRS), and focuses on using mature radionuclide removal technologies that are also compatible with longterm tank storage and immobilization methods. For this new application, testing is needed to demonstrate acceptable treatment sorbents and precipitating agents and measure decontamination factors for additional radionuclides in this unique waste stream. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet and will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. One of the radionuclides that is volatile and expected to be in greatest abundance in this LAW Off-Gas Condensate stream is Technetium-99 ({sup 99}Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are low but are also expected to be in measurable concentration in the LAW Off-Gas Condensate are {sup 129}I, {sup 90}Sr, {sup 137}Cs, {sup 241}Pu, and {sup 241}Am. These are present due to their partial volatility and some entrainment in the off-gas system. This report discusses results of optimized {sup 99}Tc decontamination testing of the simulant. Testing examined use of inorganic reducing agents for {sup 99}Tc. Testing focused on minimizing the quantity of sorbents/reactants added, and minimizing mixing time to reach the decontamination targets in this simulant formulation. Stannous chloride and ferrous sulfate were tested as reducing agents to determine the minimum needed to convert soluble pertechnetate to the insoluble technetium dioxide. The reducing agents were tried with and without sorbents.

Taylor-Pashow, K.; Nash, C.; McCabe, D.

2014-09-29T23:59:59.000Z

248

Tracer Testing At Raft River Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

3) 3) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Tracer Testing Activity Date 1983 Usefulness not indicated DOE-funding Unknown Exploration Basis To develop chemical tracing procedures for geothermal areas. Notes Two field experiments were conducted to develop chemical tracer procedures for use with injection-backflow testing, one on the fracture-permeability Raft River reservoir and the other on the matrix-permeability East Mesa reservoir. Results from tests conducted with incremental increases in the injection volume at both East Mesa and Raft River suggests that, for both reservoirs, permeability remained uniform with increasing distance from the well bore. Increased mixing during quiescent periods, between injection and

249

Tracer Testing At East Mesa Geothermal Area (1983) | Open Energy  

Open Energy Info (EERE)

Tracer Testing At East Mesa Geothermal Area (1983) Tracer Testing At East Mesa Geothermal Area (1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At East Mesa Geothermal Area (1983) Exploration Activity Details Location East Mesa Geothermal Area Exploration Technique Tracer Testing Activity Date 1983 Usefulness not indicated DOE-funding Unknown Notes Two field experiments were conducted to develop chemical tracer procedures for use with injection-backflow testing, one on the fracture-permeability Raft River reservoir and the other on the matrix-permeability East Mesa reservoir. Results from tests conducted with incremental increases in the injection volume at both East Mesa and Raft River suggests that, for both reservoirs, permeability remained uniform with increasing distance from the

250

Pilot-scale treatability testing -- Recycle, reuse, and disposal of materials from decontamination and decommissioning activities: Soda blasting demonstration  

SciTech Connect

The US Department of Energy (DOE) is in the process of defining the nature and magnitude of decontamination and decommissioning (D and D) obligations at its sites. With disposal costs rising and available storage facilities decreasing, DOE is exploring and implementing new waste minimizing D and D techniques. Technology demonstrations are being conducted by LMES at a DOE gaseous diffusion processing plant, the K-25 Site, in Oak Ridge, Tennessee. The gaseous diffusion process employed at Oak Ridge separated uranium-235 from uranium ore for use in atomic weapons and commercial reactors. These activities contaminated concrete and other surfaces within the plant with uranium, technetium, and other constituents. The objective of current K-25 D and D research is to make available cost-effective and energy-efficient techniques to advance remediation and waste management methods at the K-25 Site and other DOE sites. To support this objective, O`Brien and Gere tested a decontamination system on K-25 Site concrete and steel surfaces contaminated with radioactive and hazardous waste. A scouring system has been developed that removes fixed hazardous and radioactive surface contamination and minimizes residual waste. This system utilizes an abrasive sodium bicarbonate medium that is projected at contaminated surfaces. It mechanically removes surface contamination while leaving the surface intact. Blasting residuals are captured and dissolved in water and treated using physical/chemical processes. Pilot-scale testing of this soda blasting system and bench and pilot-scale treatment of the generated residuals were conducted from December 1993 to September 1994.

NONE

1995-08-01T23:59:59.000Z

251

Radiokrypton dating finally takes off  

Science Journals Connector (OSTI)

...dating, based on the well-known radioactive decay...essentially has a single, well-mixed, and steady source, the...fortunately it works well for noble gases...Isolation Pilot Plant, New Mexico . J Contam Hydrol 160...radionuclides in Yellowstone geothermal gas emissions: A reconnaissance...

Werner Aeschbach-Hertig

2014-01-01T23:59:59.000Z

252

Development And Initial Testing Of Off-Gas Recycle Liquid From The WTP Low Activity Waste Vitrification Process - 14333  

SciTech Connect

The Waste Treatment and Immobilization Plant (WTP) process flow was designed to pre-treat feed from the Hanford tank farms, separate it into a High Level Waste (HLW) and Low Activity Waste (LAW) fraction and vitrify each fraction in separate facilities. Vitrification of the waste generates an aqueous condensate stream from the off-gas processes. This stream originates from two off-gas treatment unit operations, the Submerged Bed Scrubber (SBS) and the Wet Electrospray Precipitator (WESP). Currently, the baseline plan for disposition of the stream from the LAW melter is to recycle it to the Pretreatment facility where it gets evaporated and processed into the LAW melter again. If the Pretreatment facility is not available, the baseline disposition pathway is not viable. Additionally, some components in the stream are volatile at melter temperatures, thereby accumulating to high concentrations in the scrubbed stream. It would be highly beneficial to divert this stream to an alternate disposition path to alleviate the close-coupled operation of the LAW vitrification and Pretreatment facilities, and to improve long-term throughput and efficiency of the WTP system. In order to determine an alternate disposition path for the LAW SBS/WESP Recycle stream, a range of options are being studied. A simulant of the LAW Off-Gas Condensate was developed, based on the projected composition of this stream, and comparison with pilot-scale testing. The primary radionuclide that vaporizes and accumulates in the stream is Tc-99, but small amounts of several other radionuclides are also projected to be present in this stream. The processes being investigated for managing this stream includes evaporation and radionuclide removal via precipitation and adsorption. During evaporation, it is of interest to investigate the formation of insoluble solids to avoid scaling and plugging of equipment. Key parameters for radionuclide removal include identifying effective precipitation or ion adsorption chemicals, solid-liquid separation methods, and achievable decontamination factors. Results of the radionuclide removal testing indicate that the radionuclides, including Tc-99, can be removed with inorganic sorbents and precipitating agents. Evaporation test results indicate that the simulant can be evaporated to fairly high concentration prior to formation of appreciable solids, but corrosion has not yet been examined.

McCabe, Daniel J.; Wilmarth, William R.; Nash, Charles A.; Taylor-Pashow, Kathryn M.; Adamson, Duane J.; Crawford, Charles L.; Morse, Megan M.

2014-01-07T23:59:59.000Z

253

Activities  

Energy.gov (U.S. Department of Energy (DOE))

Activities and events provide Residential Network members the opportunity to discuss similar needs and challenges, and to collectively identify effective strategies and useful resources.

254

Flow Test At Raft River Geothermal Area (2008) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (2008) Flow Test At Raft River Geothermal Area (2008) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2008) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 2008 Usefulness not indicated DOE-funding Unknown Exploration Basis To confirm resource using flow tests Notes Both production and injection wells were flow tested. Aslo includes interference testing across the well field. References Glaspey, Douglas J. (30 January 2008) Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Raft_River_Geothermal_Area_(2008)&oldid=473856

255

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination Down Hole Seismic Source 68-SX-11 CX(s) Applied: B3.7, B5.12 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006664: Categorical Exclusion Determination Rocky Mountain Oilfield Testing Center Process Improvement Old Pipe Yard Clean Up

256

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006069: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011

257

OTS NOTE DATE: TO: FROM:  

Office of Legacy Management (LM)

TO: FROM: March 25, 1991 A. Williams D. stout P SUBJECT: Elimination Recommendation for the Star Cutter Corporation The .attached memorandum and supporting documents are the basis for our recommendation to eliminate the former Star Cutter Corporation site from further consideration under FUSRAP. The site is located in Farmington Hills, Michigan. Documents discovered to date which indicate use or handling of radioactive material by Star Cutter consist of two Analytical Data Sheets, dated June 29, 1956, prepared by the National Lead Company of Ohio (NLO), an Atomic Energy Commission (AEC) prime contractor. The data sheets report the results of radiological monitoring conducted during operation of an oil- cooled drilling/hollowing machine. The sheets record measurements during

258

Save the Date - NTSF 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date Save the Date U.S. Department of Energy National Transportation Stakeholders Forum May 14-16 th , 2013 Buffalo, New York Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. The 2013 meeting is co-sponsored by DOE's Offices of Environmental Management and Nuclear Energy and follows several highly successful yearly gatherings. It is co-hosted by the Council of State Governments Eastern Regional Conference and the Northeast High-Level Radioactive Waste Transportation Task Force.

259

Request Log Closedl Date Yes  

NLE Websites -- All DOE Office Websites (Extended Search)

6 FOIA 6 FOIA - Request Log Closedl Date Yes 01 127106 Yes 02/23/06 Yes 04/05/06 Yes 04/03/06 Yes 04/03/06 Yes 05/22/06 Yes 35/30/06 - No. - 00 1 - 002 - 003 - 004 005 006 - 307 - Dated 01 125106 0211 6106 03/29/06 03/31 106 14/03/06 1511 8/06 )5/22/06 Date Rec'd 0 I I2 5/06 02/23/06 03130/06 0313 1 106 04/03/06 05/22/06 05/22/06 HQ or Dir. Direct Transfer from HQ Direct Trans from HQ Direct Direct Transfer 'rom HQ Subject Requesting a list of all your Procurement card holders Requesting copies of any and all Freedom of Information Act (FOIA) requests submitted to the Department of Energy (DOE) by Donna Wright, the Bradenton Herald, or any other individual that requested documentation or information pertaining to the Loral American Beryllium Corporation (also known as the

260

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-006599: Categorical Exclusion Determination Environmental Restoration and Waste Management Activities, Fiscal Year 2012-2013 CX(s) Applied: B6.1, B6.2 Date: 08/23/2011 Location(s): Amarillo, Texas Office(s): NNSA-Headquarters, Pantex Site Office August 23, 2011 CX-006598: Categorical Exclusion Determination Site Characterization, Monitoring, and General Research Activities, Fiscal Year 2012-2013 CX(s) Applied: B3.1, B3.6, B3.8 Date: 08/23/2011 Location(s): Amarillo, Texas Office(s): NNSA-Headquarters, Pantex Site Office August 23, 2011 CX-006542: Categorical Exclusion Determination American Recovery and Reinvestment Act Energy Efficiency Conservation Block Grant - State of Louisiana Saint James Parish CX(s) Applied: B5.1 Date: 08/23/2011 Location(s): Saint James Parish, Louisiana

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) | Open Energy  

Open Energy Info (EERE)

Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lake City Hot Springs Area (Benoit Et Al., 2005) Exploration Activity Details Location Lake City Hot Springs Area Exploration Technique Flow Test Activity Date Usefulness useful DOE-funding Unknown Notes Core holes enabled injection and flow testing up to 70 gpm. References Dick Benoit, Joe Moore, Colin Goranson, David Blackwell (2005) Core Hole Drilling And Testing At The Lake City, California Geothermal Field Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Lake_City_Hot_Springs_Area_(Benoit_Et_Al.,_2005)&oldid=386872" Category: Exploration Activities What links here Related changes

262

Stress Test At Coso Geothermal Area (2004) | Open Energy Information  

Open Energy Info (EERE)

Stress Test At Coso Geothermal Area (2004) Stress Test At Coso Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Stress Test At Coso Geothermal Area (2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Stress Test Activity Date 2004 Usefulness not indicated DOE-funding Unknown Exploration Basis EGS potential of Coso Geothermal Region Notes A hydraulic fracturing stress test at 3,703 feet TVD was used to constrain a normal faulting and strike-slip faulting stress tensor for this reservoir. The shear and normal stresses resolved on the fracture and fault planes were calculated and used to identify the subset of critically stressed planes that act to maintain permeability within the Coso Geothermal Field. References

263

The Resonating Arm Exerciser: design and pilot testing of a mechanically passive rehabilitation device that mimics robotic active assistance  

E-Print Network (OSTI)

M: Electromechanical and robot-assisted arm training forthat provides robot-like assistance for active arm trainingRobots allow a variety of forms of active Page 2 of 12 assistance to be provided for arm

Zondervan, Daniel K; Palafox, Lorena; Hernandez, Jorge; Reinkensmeyer, David J

2013-01-01T23:59:59.000Z

264

Laboratory Scoping Tests Of Decontamination Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant  

SciTech Connect

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Off-Gas Condensate) from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of glass waste. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task seeks to examine the potential treatment of this stream to remove radionuclides and subsequently disposition the decontaminated stream elsewhere, such as the Effluent Treatment Facility (ETF), for example. The treatment process envisioned is very similar to that used for the Actinide Removal Process (ARP) that has been operating for years at the Savannah River Site (SRS), and focuses on using mature radionuclide removal technologies that are also compatible with longterm tank storage and immobilization methods. For this new application, testing is needed to demonstrate acceptable treatment sorbents and precipitating agents and measure decontamination factors for additional radionuclides in this unique waste stream. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet and will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. One of the radionuclides that is volatile and expected to be in high concentration in this LAW Off-Gas Condensate stream is Technetium-99 ({sup 99}Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are also expected to be in appreciable concentration in the LAW Off-Gas Condensate are {sup 129}I, {sup 90}Sr, {sup 137}Cs, and {sup 241}Am. This report discusses results of preliminary radionuclide decontamination testing of the simulant. Testing examined use of Monosodium Titanate (MST) to remove {sup 90}Sr and actinides, inorganic reducing agents for {sup 99}Tc, and zeolites for {sup 137}Cs. Test results indicate that excellent removal of {sup 99}Tc was achieved using Sn(II)Cl{sub 2} as a reductant, coupled with sorption onto hydroxyapatite, even in the presence of air and at room temperature. This process was very effective at neutral pH, with a Decontamination Factor (DF) >577 in two hours. It was less effective at alkaline pH. Conversely, removal of the cesium was more effective at alka

Taylor-Pashow, Kathryn M.; Nash, Charles A.; Crawford, Charles L.; McCabe, Daniel J.; Wilmarth, William R.

2014-01-21T23:59:59.000Z

265

Dating Pleistocene Archeological Sites by Protein Diagenesis in Ostrich Eggshell  

Science Journals Connector (OSTI)

...Holocene 4C-dated samples from the east-ern Sahara (Egypt and Sudan) and from South Africa yields an activation ener-gy, Ea...temperature in this region today, as measured directly with thermal sensors, averages 26.4 C. Several samples with known A...

A. S. Brooks; P. E. Hare; J. E. Kokis; G. H. Miller; R. D. Ernst; F. Wendorf

1990-04-06T23:59:59.000Z

266

Flow Test At Coso Geothermal Area (1978) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Coso Geothermal Area (1978) Flow Test At Coso Geothermal Area (1978) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Flow Test Activity Date 1978 Usefulness not indicated DOE-funding Unknown Notes Flow tests of well CGEH No. 1 were conducted. LBL performed eight temperature surveys after completion of the well to estimate equilibrium reservoir temperatures. Downhole fluid samples were obtained by the U.S. Geological Survey (USGS) and Lawrence Berkeley Laboratory (LBL), and a static pressure profile was obtained. The first test began September 5, 1978 using nitrogen stimulation to initiate flow; this procedure resulted in small flow and subsequent filling of the bottom hole with drill cuttings. The second test, on November 2, 1978, utilized a nitrogen-foam-water mixture to clean residual particles from bottom hole,

267

Colorado stride (COSTRIDE): testing genetic and physiological moderators of response to an intervention to increase physical activity  

E-Print Network (OSTI)

details University of Colorado Boulder, Boulder, CO 80309,data and rationale for Colorado STRIDE. J Behav Med 2013,as: Bryan et al. : Colorado stride (COSTRIDE): testing

Bryan, Angela D; Magnan, Renee E; Hooper, Ann E; Ciccolo, Joseph T; Marcus, Bess; Hutchison, Kent E

2013-01-01T23:59:59.000Z

268

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-004065: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11 Date: 10/01/2010 Location(s): Palo Alto, California Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004064: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Holbrook, Arizona Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004063: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System

269

Updated: September, 2012 Intent to Hold FPM Course/Test  

E-Print Network (OSTI)

Updated: September, 2012 FORM A Intent to Hold FPM Course/Test Which course are you conducting? (check only one) 2-day course 1-day course Test only Re-Test only Test & Re-Test Food Handlers What date(s) are you conducting the training/testing? ______________________________ (mm

270

Test Automation Test Automation  

E-Print Network (OSTI)

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

271

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005656: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Flint, Michigan Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005655: Categorical Exclusion Determination Recovery Act ? Clean Energy Coalition Schwan?s Home Service CX(s) Applied: A7, B5.1 Date: 04/28/2011 Location(s): Wakarusa, Indiana Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory April 28, 2011 CX-005653: Categorical Exclusion Determination Pilot-Scale Testing Evaluating the Effects of Bromine Additions on Continuous Mercury Monitors at Low Mercury Concentrations CX(s) Applied: A9, B3.6 Date: 04/28/2011

272

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2010 22, 2010 CX-001991: Categorical Exclusion Determination Northern New Mexico College - El Rito Campus CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-001990: Categorical Exclusion Determination Highlands University CX(s) Applied: B5.1 Date: 02/22/2010 Location(s): Las Vegas, New Mexico Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010 CX-000926: Categorical Exclusion Determination "Feedstock to Tailpipe Initiative": Kansas Biofuels Production, Testing and Certification Laboratory CX(s) Applied: B3.6 Date: 02/22/2010 Location(s): Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 22, 2010

273

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2013 May 30, 2013 CX-010215: Categorical Exclusion Determination Laufer Wind Group National Wind Technology Center Structure Lighting Tests CX(s) Applied: B1.31, B5.15 Date: 05/30/2013 Location(s): Colorado Offices(s): Golden Field Office May 30, 2013 CX-010483: Categorical Exclusion Determination Man Hole Cover Assembly Replacement CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2013 CX-010508: Categorical Exclusion Determination Cloud County Community College Wind Turbine CX(s) Applied: A9, A11, B3.14 Date: 05/29/2013 Location(s): Kansas Offices(s): Golden Field Office May 29, 2013 CX-010480: Categorical Exclusion Determination Development of a Multi-User Network Testbed for Wide-Area Monitoring and

274

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008950: Categorical Exclusion Determination Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 08/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008949: Categorical Exclusion Determination Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations CX(s) Applied: A9, B3.6 Date: 08/13/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008884: Categorical Exclusion Determination Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 13, 2012 CX-008879: Categorical Exclusion Determination Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project

275

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2009 6, 2009 CX-000541: Categorical Exclusion Determination Checkout of StreamPro ADCP (Acoustic Doppler Current Profiler) Velocity Meter CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-000540: Categorical Exclusion Determination Advanced Fuel Cycle Initiative Americium/Curium separations CX(s) Applied: B3.6 Date: 11/16/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office November 16, 2009 CX-006654: Categorical Exclusion Determination B-1-28 Test Site Reclamation CX(s) Applied: B1.3, B1.28, B6.1 Date: 11/16/2009 Location(s): Casper, Wyoming Office(s): RMOTC November 16, 2009 CX-006660: Categorical Exclusion Determination

276

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2010 January 5, 2010 CX-000802: Categorical Exclusion Determination Transmission Electron Microscopy Specimen Preparation by Electropolishing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000803: Categorical Exclusion Determination Production of Hazardous Enhanced Chemical Cleaning Sludge Simulants CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office January 5, 2010 CX-000804: Categorical Exclusion Determination 9975, 9977 and 9978 Annual Maintenance and Testing CX(s) Applied: B3.6 Date: 01/05/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

277

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2013 14, 2013 CX-010493: Categorical Exclusion Determination Determining Distribution Coefficients by Surface-Enhanced Raman Spectroscopy (SERS) CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010492: Categorical Exclusion Determination Permeation Testing Metals, Ceramics, and Polymers CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010282: Categorical Exclusion Determination Low Temperature Nitrous Oxide Storage and Reduction Using Engineered Materials CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): New Jersey Offices(s): National Energy Technology Laboratory May 14, 2013 CX-010281: Categorical Exclusion Determination

278

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2011 12, 2011 CX-006468: Categorical Exclusion Determination Testing Subcontractor for Fenestration System Energy Performance Rating Development and Research CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 12, 2011 CX-006466: Categorical Exclusion Determination Deep/Shallow Well Laboratory CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory August 11, 2011 CX-006490: Categorical Exclusion Determination Bat Roost Tower Construction CX(s) Applied: B1.20 Date: 08/11/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office August 11, 2011 CX-006478: Categorical Exclusion Determination

279

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 CX-004740: Categorical Exclusion Determination Install Amonix Panels at National Solar Thermal Test Facility CX(s) Applied: B5.1 Date: 11/23/2010 Location(s): New Mexico Office(s): Sandia Site Office November 23, 2010 CX-004719: Categorical Exclusion Determination Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install) CX(s) Applied: B1.7 Date: 11/23/2010 Location(s): Louisiana Office(s): Strategic Petroleum Reserve Field Office November 23, 2010 CX-004592: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A9, A11, B3.6 Date: 11/23/2010 Location(s): Wooster, Ohio Office(s): Fossil Energy, National Energy Technology Laboratory

280

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2011 8, 2011 CX-005332: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7 Date: 02/28/2011 Location(s): Wichita, Kansas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 28, 2011 CX-005329: Categorical Exclusion Determination Fluid-Bed Testing of GreatPoint Energy's Direct Oxygen Injection Catalytic Gasification Process CX(s) Applied: B3.6 Date: 02/28/2011 Location(s): Grand Forks, North Dakota Office(s): Fossil Energy, National Energy Technology Laboratory February 28, 2011 CX-005301: Categorical Exclusion Determination Alaska-Tribal Energy Program-The Tatitlek Corporation CX(s) Applied: A9, A11 Date: 02/28/2011 Location(s): Tatitlek, Alaska Office(s): Energy Efficiency and Renewable Energy

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 CX-006067: Categorical Exclusion Determination Indoor Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office

282

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-006354: Categorical Exclusion Determination Extraction and Recovery of Lignin and Hemicellulose from Biomass CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006353: Categorical Exclusion Determination Grout Formulation and Variability Testing CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 23, 2011 CX-006349: Categorical Exclusion Determination Ohio-City-Cuyahoga Falls CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 06/23/2011 Location(s): Cuyahoga Falls, Ohio Office(s): Energy Efficiency and Renewable Energy June 23, 2011 CX-006347: Categorical Exclusion Determination

283

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2012 November 29, 2012 CX-009633: Categorical Exclusion Determination Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 28, 2012 CX-009552: Categorical Exclusion Determination Central Vermont Recovered Biomass Facility CX(s) Applied: B5.20 Date: 11/28/2012 Location(s): Vermont Offices(s): Golden Field Office November 28, 2012 CX-009547: Categorical Exclusion Determination Recovery Act: Advanced Seismic Data Analysis Program ('Hot Pot Project')

284

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2011 15, 2011 CX-006137: Categorical Exclusion Determination B39 Cellular Repeater Installation CX(s) Applied: B1.7 Date: 06/15/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006136: Categorical Exclusion Determination Field Testing of Low Impact Oil Field Roads CX(s) Applied: B3.7 Date: 06/15/2011 Location(s): Webb County, Texas Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006079: Categorical Exclusion Determination Topic 7A, Emergency Backup Power Systems CX(s) Applied: A9, B5.1 Date: 06/15/2011 Location(s): Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 14, 2011 CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable

285

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6 Date: 10/18/2010 Location(s): Reno, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office October 18, 2010 CX-004290: Categorical Exclusion Determination Greenfield Community College - Geothermal Project CX(s) Applied: B5.1 Date: 10/18/2010 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

286

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-009375: Categorical Exclusion Determination A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data CX(s) Applied: A9 Date: 09/17/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009374: Categorical Exclusion Determination Development of a Carbon Dioxide Chemical Sensor for Downhole Carbon Dioxide Monitoring in Carbon Sequestration CX(s) Applied: B3.6 Date: 09/17/2012 Location(s): New Mexico Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009373: Categorical Exclusion Determination Testing of an Advanced Dry Cooling Technology for Power Plants CX(s) Applied: B3.6 Date: 09/17/2012 Location(s): North Dakota Offices(s): National Energy Technology Laboratory September 17, 2012

287

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 22, 2012 February 22, 2012 CX-007929: Categorical Exclusion Determination Midwest Region Alternative Fuels Project: Black Hills Energy Compressed Natural Gas Infrastructure CX(s) Applied: B5.22 Date: 02/22/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007928: Categorical Exclusion Determination Game Changing Technology of Polymeric-Surfactants for Tertiary Oil CX(s) Applied: A9, B3.6 Date: 02/22/2012 Location(s): Indiana Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007927: Categorical Exclusion Determination Compressor Testing of Next Generation Refrigeration Lubricants CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Illinois Offices(s): National Energy Technology Laboratory February 22, 2012 CX-007926: Categorical Exclusion Determination

288

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 1, 2012 CX-008288: Categorical Exclusion Determination Decommissioning of the Appliance Testing and Evaluation Center in Morgantown CX(s) Applied: B3.6 Date: 05/01/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008287: Categorical Exclusion Determination Technology Integration Program CX(s) Applied: A9 Date: 05/01/2012 Location(s): CX: none Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008286: Categorical Exclusion Determination Technology Integration Program CX(s) Applied: A9, A11, B3.6 Date: 05/01/2012 Location(s): Tennessee Offices(s): National Energy Technology Laboratory May 1, 2012 CX-008285: Categorical Exclusion Determination E85 (Ethanol) Retail Fueling Infrastructure Installation CX(s) Applied: B5.22

289

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-009619: Categorical Exclusion Determination Dissolution of Sludge Constituents in Glycolate-Containing 2H Evaporator Rad Feed Solution CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009618: Categorical Exclusion Determination Defense Threat Reduction Agency (DTRA) Radar Testing CX(s) Applied: B3.1 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009617: Categorical Exclusion Determination Gas Mass Spectrometry CX(s) Applied: B3.6 Date: 11/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2012 CX-009432: Categorical Exclusion Determination Transformational Approach to Reducing the Total System Costs of Building

290

Estimated Cost Description Determination Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title, Location Title, Location Estimated Cost Description Determination Date: 2010 LCLS Undulator 2 is envisioned to be a 0.2 - 2keV FEL x-ray source, capable of delivering x-rays to End Station A (ESA), located in the existing Research Yard at SLAC. It will also be configurable as a non- FEL hard x-ray source capable of delivering a chirped x-ray pulse for single-shot broad-spectrum measurements. The project would entail reconstruction of the electron beam transport to End Station A, construction and installation of a new undulator in the tunnel upstream of ESA and beam dump, and construction and installation of x-ray transport, optics, and diagnostics in ESA. It also includes the construction of an annex to End Station A , providing hutches for experiment stations.

291

test1 - Datasets - OpenEI Datasets  

Open Energy Info (EERE)

test1 This is only a test Data and Resources TEST1.1com TESTING More info Go to resource doe test1 test2 test Additional Info Field Value Catalog OpenEI Origination Date 2014-11-12...

292

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2012 19, 2012 CX-009638: Categorical Exclusion Determination Replacement, Removal, and Closure of Underground Storage Tanks CX(s) Applied: B2.5, B6.1 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009637: Categorical Exclusion Determination Removing Items or Materials Containing Polychlorinated Biphenyls CX(s) Applied: B1.17 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009636: Categorical Exclusion Determination Ventilation Activities CX(s) Applied: B1.4, B1.16, B2.1, B2.3 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009544: Categorical Exclusion Determination

293

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2010 5, 2010 CX-003227: Categorical Exclusion Determination Hidalgo County: Activity 11: Park Efficient Light Project American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant (S) CX(s) Applied: A9, A11, B5.1 Date: 08/05/2010 Location(s): County of Hidalgo, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 5, 2010 CX-003220: Categorical Exclusion Determination Hot Pot Project CX(s) Applied: A9, B3.1 Date: 08/05/2010 Location(s): Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 5, 2010 CX-003200: Categorical Exclusion Determination City of Lafayette Energy Efficiency Conservation Block Grant CX(s) Applied: B5.1 Date: 08/05/2010 Location(s): Lafayette, Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

294

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004502: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant: Installation of Photovoltaic System to Serve County of Monterey Laurel Yard Facilities (Activity 1) CX(s) Applied: B5.1 Date: 11/19/2010 Location(s): County of Monterey, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004501: Categorical Exclusion Determination City of Anaheim CX(s) Applied: B5.1 Date: 11/19/2010 Location(s): Anaheim, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004500: Categorical Exclusion Determination Energy and Daylighting Demonstration & Assessment of Sunlight Responsive Thermochromic Window Systems CX(s) Applied: B3.6 Date: 11/19/2010

295

Dating of major normal fault systems using thermochronology- An example  

Open Energy Info (EERE)

Dating of major normal fault systems using thermochronology- An example Dating of major normal fault systems using thermochronology- An example from the Raft River detachment, Basin and Range, western United States Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Dating of major normal fault systems using thermochronology- An example from the Raft River detachment, Basin and Range, western United States Details Activities (1) Areas (1) Regions (0) Abstract: Application of thermochronological techniques to major normal fault systems can resolve the timing of initiation and duration of extension, rates of motion on detachment faults, timing of ductile mylonite formation and passage of rocks through the crystal-plastic to brittle transition, and multiple events of extensional unroofing. Here we determine

296

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2011 9, 2011 CX-006404: Categorical Exclusion Determination Install a Pressure Regulator and Relief Valve on the Tank 26 Flush Water Piping CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006403: Categorical Exclusion Determination Enhanced Low Activity Waste Disposal Premix Silo Area Modifications CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006402: Categorical Exclusion Determination 704-N Wireless Access CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011

297

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-002350: Categorical Exclusion Determination Ohio Advanced Transportation Partnership (OATP) CX(s) Applied: A7 Date: 05/11/2010 Location(s): Ohio Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 11, 2010 CX-002663: Categorical Exclusion Determination Solar-Assisted Electrical Vehicle Charging Stations CX(s) Applied: B5.1 Date: 05/11/2010 Location(s): Oak Ridge, Tennessee Office(s): Oak Ridge Office, Science May 11, 2010 CX-002662: Categorical Exclusion Determination Installation and Operation of Majorana Underground Electro-forming Research Project CX(s) Applied: B3.6 Date: 05/11/2010 Location(s): Lead, South Dakota Office(s): Oak Ridge Office, Science May 11, 2010 CX-002347: Categorical Exclusion Determination Activity 6.2.5 ? Outreach and Education for Hydrogen Production and

298

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09640: Categorical Exclusion Determination 09640: Categorical Exclusion Determination Communications, Computing, and Data Processing Activities CX(s) Applied: B1.7, B4.7 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009638: Categorical Exclusion Determination Replacement, Removal, and Closure of Underground Storage Tanks CX(s) Applied: B2.5, B6.1 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009637: Categorical Exclusion Determination Removing Items or Materials Containing Polychlorinated Biphenyls CX(s) Applied: B1.17 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office November 19, 2012 CX-009636: Categorical Exclusion Determination

299

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 1, 2013 August 1, 2013 CX-010819: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1, B3.6 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory August 1, 2013 CX-010835: Categorical Exclusion Determination Disconnect Equipment and Activate Gloveboxes From Lab 174, Gloveboxes 12 & 13 CX(s) Applied: B2.3 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010834: Categorical Exclusion Determination 704-L Machine Shop Equipment Removal CX(s) Applied: B1.24 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010818: Categorical Exclusion Determination Technology Integration Program - Field Trial - Site Three

300

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 CX-004630: Categorical Exclusion Determination California- City- Tulare CX(s) Applied: A1, A9, A11, B5.1 Date: 11/30/2010 Location(s): Tulare, California Office(s): Energy Efficiency and Renewable Energy November 30, 2010 CX-004634: Categorical Exclusion Determination Nevada- Tribe- Walker River Paiute Tribe CX(s) Applied: B3.6, B5.1 Date: 11/30/2010 Location(s): Nevada Office(s): Energy Efficiency and Renewable Energy November 30, 2010 CX-004548: Categorical Exclusion Determination Active Flow Control on Bidirectional Rotors for Tidal Marine Hydrokinetic Applications CX(s) Applied: A9 Date: 11/30/2010 Location(s): Davis, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 30, 2010 CX-004582: Categorical Exclusion Determination

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-004846: Categorical Exclusion Determination Work in the High Pressure Laboratory CX(s) Applied: B3.6 Date: 12/17/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 17, 2010 CX-004844: Categorical Exclusion Determination B-Wing High Activity Drain Exhaust (HADE) Filter Housing CX(s) Applied: B1.3 Date: 12/17/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 17, 2010 CX-004843: Categorical Exclusion Determination Stable Electrocatalysts for High Temperature Fuel Cells CX(s) Applied: B3.6 Date: 12/17/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 17, 2010 CX-004841: Categorical Exclusion Determination Scanned Probe Microscopy Surface Analysis and Sample Preparation

302

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 CX-007821: Categorical Exclusion Determination Routine Activities at the Site A/Plot M, Illinois, Decommissioned Reactor Site CX(s) Applied: B1.3, B3.1 Date: 02/09/2012 Location(s): Illinois Offices(s): Legacy Management February 9, 2012 CX-007846: Categorical Exclusion Determination Texas - City - Mesquite CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 02/09/2012 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy February 9, 2012 CX-007961: Categorical Exclusion Determination Fabrication of Alloys With Trace Depleted Uranium in 1750 C Tube Furnace With Argon Cover in D-0142 CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 9, 2012 CX-007820: Categorical Exclusion Determination

303

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12, 2010 12, 2010 CX-002966: Categorical Exclusion Determination City of Wichita Energy Efficiency and Conservation Block Grant Activity #7 McAdams - Bike Pathway CX(s) Applied: B5.1 Date: 07/12/2010 Location(s): Wichita, Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 12, 2010 CX-002965: Categorical Exclusion Determination Mixed Conducting Corrosion Resistant Materials for Polymer Electrolyte Fuel Cells CX(s) Applied: B3.6 Date: 07/12/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 12, 2010 CX-002977: Categorical Exclusion Determination Wind Spires as an Alternative Energy Source CX(s) Applied: B5.1 Date: 07/12/2010 Location(s): Cleveland, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

304

NTSF Spring 2013 Save The Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Waste Management » Packaging and Transportation » Services » Waste Management » Packaging and Transportation » National Transportation Stakeholders Forum » National Transportation Stakeholders Forum (NTSF) Charter » NTSF Spring 2013 Save The Date NTSF Spring 2013 Save The Date Please mark your calendar to attend the next meeting of the U.S. Department of Energy (DOE) National Transportation Stakeholders Forum (NTSF) scheduled for May 14-16, 2013. This annual event will be held at the Hyatt Regency Hotel, located near the downtown business and entertainment districts in Buffalo, New York. Save the Date - NTSF 2013 More Documents & Publications NTSF registration announcement NTSF Activities and Accomplishments NTSF 2013 Agenda Waste Management Nuclear Materials & Waste Tank Waste and Waste Processing

305

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 3, 2013 June 3, 2013 CX-010527: Categorical Exclusion Determination Renovations and Maintenance Activities for Buildings, Structures CX(s) Applied: B1.3 Date: 06/03/2013 Location(s): Illinois Offices(s): Ames Site Office June 3, 2013 CX-010526: Categorical Exclusion Determination Bench-Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): Illinois Offices(s): Ames Site Office June 3, 2013 CX-010512: Categorical Exclusion Determination Blackfeet Energy Efficiency Retrofits CX(s) Applied: B5.1 Date: 06/03/2013 Location(s): Montana Offices(s): Golden Field Office June 3, 2013 CX-010507: Categorical Exclusion Determination Development and Demonstration of Smart Grid Inverters for High-Penetration Photovoltaic Applications

306

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488: Categorical Exclusion Determination 488: Categorical Exclusion Determination Public Commuter Bike Station (and Cycling Initiative) CX(s) Applied: A11, B5.1 Date: 04/07/2010 Location(s): Saint Louis, Missouri Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 7, 2010 CX-002551: Categorical Exclusion Determination Replace Defense Waste Processing Facility Argon Tank CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 7, 2010 CX-001492: Categorical Exclusion Determination City of Saint Louis Missouri Statement of Work and All Activities Excluding Bike Station Project CX(s) Applied: A9, A11, B5.1 Date: 04/07/2010 Location(s): St. Louis, Missouri Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

307

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2010 20, 2010 CX-002033: Categorical Exclusion Determination Recovery Act: County of Monterey, California Energy Efficiency and Conservation Block Grant CX(s) Applied: A9, A11, B5.1 Date: 04/20/2010 Location(s): Monterey County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-002032: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant: Bike Lane Activity CX(s) Applied: A11, B5.1 Date: 04/20/2010 Location(s): San Luis Obispo County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 20, 2010 CX-002031: Categorical Exclusion Determination Lerdo Jail Solar Facility CX(s) Applied: B5.1 Date: 04/20/2010 Location(s): Kern County, California Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

308

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-003667: Categorical Exclusion Determination Slit Trench 1 - 5 Closure Activity CX(s) Applied: B6.1 Date: 07/27/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 27, 2010 CX-003666: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 07/27/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 27, 2010 CX-003247: Categorical Exclusion Determination Alaska-Tribe-Hoonah Indian Association CX(s) Applied: B2.5, B5.1 Date: 07/27/2010 Location(s): Alaska Office(s): Energy Efficiency and Renewable Energy July 27, 2010 CX-003503: Categorical Exclusion Determination Water and Energy Emergency End Use Demand Management Measures CX(s) Applied: A1, A9, A11, B5.1

309

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 CX-006598: Categorical Exclusion Determination Site Characterization, Monitoring, and General Research Activities, Fiscal Year 2012-2013 CX(s) Applied: B3.1, B3.6, B3.8 Date: 08/23/2011 Location(s): Amarillo, Texas Office(s): NNSA-Headquarters, Pantex Site Office August 23, 2011 CX-006542: Categorical Exclusion Determination American Recovery and Reinvestment Act Energy Efficiency Conservation Block Grant - State of Louisiana Saint James Parish CX(s) Applied: B5.1 Date: 08/23/2011 Location(s): Saint James Parish, Louisiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 23, 2011 CX-006537: Categorical Exclusion Determination Electrically Supported Thermal Exchange (ELSTEX) Technology CX(s) Applied: A9, B3.6 Date: 08/23/2011

310

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination Rock Valley College, Science and Mathematics Classroom Building CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Rockford, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 28, 2010 CX-002006: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant - Energy Distribution - Project Activity 5 CX(s) Applied: B5.1 Date: 04/28/2010 Location(s): Waukesha County, Wisconsin Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 28, 2010 CX-002004: Categorical Exclusion Determination Bridge Hydro-Turbine Study CX(s) Applied: A9 Date: 04/28/2010 Location(s): Multnomah County, Oregon Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

311

Tracer Testing At Coso Geothermal Area (1993) | Open Energy Information  

Open Energy Info (EERE)

Tracer Testing At Coso Geothermal Area (1993) Tracer Testing At Coso Geothermal Area (1993) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Coso Geothermal Area (1993) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Tracer Testing Activity Date 1993 Usefulness useful DOE-funding Unknown Exploration Basis To determine the steam and water mass flow rate Notes The method involves precisely metered injection of liquid and vapor phase tracers into the two-phase production pipeline and concurrent sampling of each phase downstream of the injection point. Subsequent chemical analysis of the steam and water samples for tracer content enables the calculation of mass flowrate for each phase given the known mass injection rates of

312

Tracer Testing At Coso Geothermal Area (2006) | Open Energy Information  

Open Energy Info (EERE)

Tracer Testing At Coso Geothermal Area (2006) Tracer Testing At Coso Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Tracer Testing At Coso Geothermal Area (2006) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Tracer Testing Activity Date 2006 Usefulness useful DOE-funding Unknown Exploration Basis To characterize the flow patterns of fluid injected into well 68-20RD. Notes A conservative liquid phase tracer, 2-naphthalene sulfonate, and a two-phase tracer, ethanol, were injected into well 68-20RD. Surrounding production wells were sampled over the subsequent 125 days and analyzed for the two tracers. The results demonstrate the efficacy of the simultaneous use of liquid-phase and two-phase tracers in fluid-depleted geothermal

313

Geographic Information System At Nevada Test And Training Range Area  

Open Energy Info (EERE)

Geographic Information System At Nevada Test And Training Range Area Geographic Information System At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Geographic Information System Activity Date Usefulness not indicated DOE-funding Unknown Notes Nellis Air Force Range (NAFR) occupies over 3 million acres in southern Nevada (Figure 1). We recently assessed potential utility-grade geothermal resources and possible target areas for exploration by constructing a GIS of this area and applying the occurrence model ideas outlined above (ITSI, 2003; Sabin et al., 2004). We list below many of the factors considered.

314

activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Detecting Things We Cannot See: Learning the Concepts of Control and Detecting Things We Cannot See: Learning the Concepts of Control and Variable in an Experiment Submitted by Anita Brook-Dupree, 1996 TRAC teacher at Fermilab, Teacher, Alternative Middle Years School, Philadelphia, PA. Particle physicists at Fermilab in Batavia, Illinois are faced with the problem of detecting the presence of sub-atomic particles they cannot see. During my summer as a TRAC teacher at Fermilab, I tried to think of ways to teach middle school students about things we cannot see. I want to thank my nine-year-old daughter Gia for the idea for the following activity. I was lamenting that I could not come up with ideas of how to relate the work of Fermilab scientists to anything that my students would understand. Then I was reminded by my daughter, that when I brought her to school on the

315

Quantitative structureactivity relationships for toxicity and genotoxicity of halogenated aliphatic compounds: Wing spot test of Drosophila melanogaster  

Science Journals Connector (OSTI)

Halogenated aliphatic compounds were evaluated for toxic and genotoxic effects in the somatic mutation and recombination test employing Drosophila melanogaster. The tested chemicals included chlorinated, brominated and iodinated; mono-, di- and tri-substituted; saturated and unsaturated alkanes: 1,2-dibromoethane, 1-bromo-2-chloroethane, 1-iodopropane, 2,3-dichloropropene, 3-bromo-1-propene, epibromohydrin, 2-iodobutane, 3-chloro-2-methylpropene, 1,2,3-trichloropropane, 1,2-dichloroethane, 1,2-dichlorobutane, 1-chloro-2-methylpropane, 1,3-dichloropropane, 1,2-dichloropropane, 2-chloroethymethylether, 1-bromo-2-methylpropane and 1-chloropentane. N-methyl-N-nitrosourea served as the positive and distilled water as the negative control. The set of chemicals for the toxicological testing was selected by the use of statistical experiment design. Group of unsaturated aliphatic hydrocarbons were generally more toxic than saturated analogues. The genotoxic effect was observed with 14 compounds in the wing spot test, while 3 substances did not show any genotoxicity by using the wing spot test at 50% lethal concentration. The highest number of wing spots was observed in genotoxicity assay with 1-bromo-2-chloroethane, 1,2-dichloroethane, 1,2-dibromoethane and 1-iodopropane. Nucleophilic superdelocalizability calculated by quantum mechanics appears to be a good parameter for prediction of both toxicity and genotoxicity effects of halogenated aliphatic compounds.

Karel Chroust; Martina Pavlov; Zbyn?k Prokop; Jan Mendel; Kate?ina Bokov; Zden?k Kubt; Veronika Zaj??kov; Ji?? Damborsk

2007-01-01T23:59:59.000Z

316

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-C 09-C NEPA ID No.: PXP-11-0006 Environmental Restoration & Waste Mgt. Activities, FY 2012-2013 Application of DOE NEPA Procedure: The Categorical Exclusions B6.1 and B6.2, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), apply to project number ESH-11-009-C. Rationale: The U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), Pantex Site Office, proposes Environmental Restoration & Waste Management Activities for Fiscal Years 2012 and 2013 under project number ESH-11-009-C. These activities could include: Remedial actions, including design, construction, and operation of corrective measures (e.g., landfill covers and soil remediation activities);  Accelerated soil cleanups;

317

Policy # 5.51 SOUTHERN UTAH UNIVERSITY Date Approved: 10/21/11  

E-Print Network (OSTI)

Policy # 5.51 SOUTHERN UTAH UNIVERSITY Date Approved: 10/21/11 Date Amended: Policies RESOURCES I. PURPOSE To outline the University's policies for students, faculty, staff and others with voice, data, and video. This policy governs all activities involving the University's computing

Freden, Eric

318

Hydrogen Station Test Device Design and Fabrication | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydrogen Station Test Device Design and Fabrication Hydrogen Station Test Device Design and Fabrication October 2, 2014 - 3:02pm Addthis Open Date: August 26, 2014 Requesting...

319

Knoxville Area Transit: Propane Hybrid ElectricTrolleys; Advanced Technology Vehicles in Service, Advanced Vehicle Testing Activity (Fact Sheet)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

website and in print publications. website and in print publications. TESTING ADVANCED VEHICLES KNOXVILLE AREA TRANSIT ◆ PROPANE HYBRID ELECTRIC TROLLEYS Knoxville Area Transit PROPANE HYBRID ELECTRIC TROLLEYS NREL/PIX 13795 KNOXVILLE AREA TRANSIT (KAT) is recognized nationally for its exceptional service to the City of Knoxville, Tennessee. KAT received the American Public Transportation Associa- tion's prestigious Outstanding Achievement Award in 2004.

320

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 1, 2010 October 1, 2010 CX-004064: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Holbrook, Arizona Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004063: Categorical Exclusion Determination American Recovery and Reinvestment Act: Pilot Testing of a Membrane System for Post-Combustion Carbon Dioxide (CO2) Capture CX(s) Applied: A1, A9, A11, B3.6 Date: 10/01/2010 Location(s): Wilsonville, Alabama Office(s): Fossil Energy, National Energy Technology Laboratory October 1, 2010 CX-004062: Categorical Exclusion Determination Strategy to Accelerate United States Transition to Electric Vehicles

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Revision 1 Effective June 2008 Battery Capacity and Depth of Discharge Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP003 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

322

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Revision 1 Effective June 2008 Traction System Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP002 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

323

EV America Skid Test Procedure  

NLE Websites -- All DOE Office Websites (Extended Search)

4 4 Revision 1 Effective June 2008 Electromagnetic Interference and Susceptibility Test Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Garrett P. Beauregard Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-GTP004 Revision 1 2 Table of Contents 1 Objective ..................................................................................................................... 3 2 Purpose........................................................................................................................ 3 3 Documentation............................................................................................................

324

Recovery Efficiency Test Project: Phase 1, Activity report. Volume 1: Site selection, drill plan preparation, drilling, logging, and coring operations  

SciTech Connect

The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

1987-04-01T23:59:59.000Z

325

Last date modified 1/11/13 Location and Institution BRAZIL -PORTO ALEGRE  

E-Print Network (OSTI)

Last date modified 1/11/13 Location and Institution BRAZIL - PORTO ALEGRE throughout Brazil and service learning activities are and/or Scholarships available. See in Brazil. You must apply as soon as possible once accepted into the program

Galles, David

326

Last date modified 7/9/13 Location and Institution EGYPT -CAIRO  

E-Print Network (OSTI)

Last date modified 7/9/13 Location and Institution EGYPT - CAIRO AMERICA trips through Egypt, service learning activities, and/or Scholarships forums will need a student visa to enter and study in Egypt. You must apply as soon

Galles, David

327

Last date modified 1/15/13 Location and Institution EGYPT -CAIRO  

E-Print Network (OSTI)

Last date modified 1/15/13 Location and Institution EGYPT - CAIRO AMERICA trips through Egypt, service learning activities, and/or Scholarships forums will need a student visa to enter and study in Egypt. You must apply as soon

Galles, David

328

Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) | Open Energy  

Open Energy Info (EERE)

Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lightning Dock Area (Cunniff & Bowers, 2005) Exploration Activity Details Location Lightning Dock Area Exploration Technique Flow Test Activity Date Usefulness useful DOE-funding Unknown Notes After the Welaco temperature survey was completed for TG52-7, preparations were completed for a controlled airlift test. This test was completed in the period from 19-20 September 2003 for some 23 hours. The well produced steady state flow of about 320-325 gpm at a wellhead temperature of 126.7degrees C (260degreesF). This production rate is equivalent to about 162,000 pounds per hour, with the production temperature producing usable

329

Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) |  

Open Energy Info (EERE)

Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Fenton Hill Hdr Geothermal Area (Dash, Et Al., 1983) Exploration Activity Details Location Fenton Hill Hdr Geothermal Area Exploration Technique Injectivity Test Activity Date Usefulness useful DOE-funding Unknown Notes Fenton Hill HDR site. References Z. V. Dash, H. D. Murphy, R. L. Aamodt, R. G. Aguilar, D. W. Brown, D. A. Counce, H. N. Fisher, C. O. Grigsby, H. Keppler, A. W. Laughlin, R. M. Potter, J. W. Tester, P. E. Trujillo Jr, G. Zyvoloski (1983) Hot Dry Rock Geothermal Reservoir Testing- 1978 To 1980 Retrieved from "http://en.openei.org/w/index.php?title=Injectivity_Test_At_Fenton_Hill_Hdr_Geothermal_Area_(Dash,_Et_Al.,_1983)&oldid=511316"

330

Flow Test At Raft River Geothermal Area (2004) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (2004) Flow Test At Raft River Geothermal Area (2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2004) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 2004 Usefulness useful DOE-funding GRED II Notes Geothermal Resource Exploration and Definition Projects Raft River (GRED II): Re-assessment and testing of previously abandoned production wells. The objective of the U.S. Geothermal effort is to re-access the available wellbores, assess their condition, perform extensive testing of the reservoir to determine its productive capacity, and perform a resource utilization assessment. At the time of this paper, all five wells had been

331

Flow Test At Coso Geothermal Area (1985-1986) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Coso Geothermal Area (1985-1986) Flow Test At Coso Geothermal Area (1985-1986) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Coso Geothermal Area (1985-1986) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Flow Test Activity Date 1985 - 1986 Usefulness not indicated DOE-funding Unknown Exploration Basis Understand the connectivity of the production and injection wells. Notes A long-term flow test was conducted involving one producing well (well 43-7), one injector (well 88-1), and two observation wells (well 66-6 and California Energy Co's well 71A-7). The flow test included a well production metering system and a water injection metering system. References Sanyal, S.; Menzies, A.; Granados, E.; Sugine, S.; Gentner, R.

332

Flow Test At Raft River Geothermal Area (2006) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (2006) Flow Test At Raft River Geothermal Area (2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (2006) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 2006 Usefulness not indicated DOE-funding Unknown Exploration Basis Determine field hydraulic conductivity using borehole impeller flowmeter data Notes A quantitative evaluation of borehole-impeller flowmeter data leads to estimated field hydraulic conductivity. Data were obtained during an injection test of a geothermal well at the Raft River geothermal test site in Idaho. Both stationary and trolling calibrations of the flowmeter were made in the well. Methods were developed to adjust for variations in hole

333

HARD X-RAY LAGS IN ACTIVE GALACTIC NUCLEI: TESTING THE DISTANT REVERBERATION HYPOTHESIS WITH NGC 6814  

SciTech Connect

We present an X-ray spectral and temporal analysis of the variable active galaxy NGC 6814, observed with Suzaku during 2011 November. Remarkably, the X-ray spectrum shows no evidence for the soft excess commonly observed amongst other active galaxies, despite its relatively low level of obscuration, and is dominated across the whole Suzaku bandpass by the intrinsic powerlaw-like continuum. Despite this, we clearly detect the presence of a low-frequency hard lag of ?1600 s between the 0.5-2.0 and 2.0-5.0 keV energy bands at greater than 6? significance, similar to those reported in the literature for a variety of other active galactic nuclei (AGNs). At these energies, any additional emission from, e.g., a very weak, undetected soft excess, or from distant reflection must contribute less than 3% of the observed countrates (at 90% confidence). Given the lack of any significant continuum emission component other than the powerlaw, we can rule out models that invoke distant reprocessing for the observed lag behavior, which must instead be associated with this continuum emission. These results are fully consistent with a propagating fluctuation origin for the low-frequency hard lags, and with the interpretation of the high-frequency soft lagsa common feature seen in the highest quality AGN data with strong soft excessesas reverberation from the inner accretion disk.

Walton, D. J.; Harrison, F. A. [Cahill Centre for Astronomy and Astrophysics, California Institute of Technology, Pasadena, CA 91125 (United States)] [Cahill Centre for Astronomy and Astrophysics, California Institute of Technology, Pasadena, CA 91125 (United States); Zoghbi, A.; Reynolds, C. S. [Department of Astronomy, University of Maryland, College Park, MD 20742 (United States)] [Department of Astronomy, University of Maryland, College Park, MD 20742 (United States); Cackett, E. M. [Department of Physics and Astronomy, Wayne State University, Detroit, MI 48201 (United States)] [Department of Physics and Astronomy, Wayne State University, Detroit, MI 48201 (United States); Uttley, P. [Astronomical Institute Anton Pannekoek, University of Amsterdam, Postbus 94249, NL-1090 GE Amsterdam (Netherlands)] [Astronomical Institute Anton Pannekoek, University of Amsterdam, Postbus 94249, NL-1090 GE Amsterdam (Netherlands); Fabian, A. C.; Kara, E. [Institute of Astronomy, University of Cambridge, Madingley Road, Cambridge, CB3 0HA (United Kingdom)] [Institute of Astronomy, University of Cambridge, Madingley Road, Cambridge, CB3 0HA (United Kingdom); Miller, J. M.; Reis, R. C. [Department of Astronomy, University of Michigan, 500 Church Street, Ann Arbor, MI 48109 (United States)] [Department of Astronomy, University of Michigan, 500 Church Street, Ann Arbor, MI 48109 (United States)

2013-11-10T23:59:59.000Z

334

Activity testing of alveolar macrophages and changes in surfactant phospholipids after irradiation in bronchoalveolar lavage: Experimental and clinical data  

SciTech Connect

This study presents results of bronchoalveolar lavage (BAL) after irradiation to the lungs in mice as well as clinical data. The number of BAL cells, mainly macrophages, lymphocytes, and granulocytes, changed in a time-dependent manner. The phagocytic activity of the macrophages measured as the phagocytosis of microbeads and measured as the esterase activity also showed a strong time-dependent increase during the acute phase up to 21 days after irradiation. The contents of surfactant phospholipids (SF) and sphingomyelin (SPH; as a parameter for cell death) were quantified by HPLC. Both were significantly changed between day 2 and 21 after irradiation. Three BALs of a patient with idiopathic interstitial pneumonitis, who had received an allogenic bone marrow graft after total body irradiation with 10 Gy, showed similar effects in the cellular and surfactant parameters. These data indicate that there are positive interactions between the number of different BAL cells, macrophage activity, and SF and SPH content in the preclinical model of the mouse as well as in the clinical situation after lung irradiation. 30 refs., 7 figs., 3 tabs.

Steinberg, F.; Rehn, B.; Kraus, R.; Quabeck, K.; Bruch, J.; Beelen, D.W.; Schaefer, U.W.; Streffer, C. (Univ. Clinics, Essen (Germany))

1992-07-01T23:59:59.000Z

335

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D&D-10-001-C D&D-10-001-C NEPA ID No. PXP-10-0001 Amendment No. 10-010 Decontamination & Demolition of Residential and Farm Structures Application of DOE NEPA Procedure: Categorical Exclusions B1.23 and B6.1(c), Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), apply to the proposed activities. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activities described in Amendment No. 10-010 of NEPA Review Form (NRF) PXP-10-0001. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), recently acquired 1,526 acres of land to allow access for environmental monitoring and implementation of institutional controls. This property contains two homesteads - the former

336

Flow Test At Pilgrim Hot Springs Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Area (DOE GTP) Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Pilgrim Hot Springs Area (DOE GTP) Exploration Activity Details Location Pilgrim Hot Springs Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Pilgrim_Hot_Springs_Area_(DOE_GTP)&oldid=402456" Categories: Exploration Activities DOE Funded Activities ARRA Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863028959 Varnish cache server

337

Absolute Time Radiometric Dating: the source  

E-Print Network (OSTI)

Absolute Time Radiometric Dating: the source of the dates on the Geologic Time Scale #12 as an element changes to another element, e.g. uranium to lead. · The parent element is radioactive · Carbon-14, C14 Nitrogen-14, N14 · Uranium-235, U235 Lead-207, Pb207 · Potassium-40, K40 Argon-40, Ar40

Kammer, Thomas

338

Vehicle arrived for disposal Date Disposal of Asset form approved (copy required) Date  

E-Print Network (OSTI)

Colour Engine (ltrs) Fuel (ulp/diesel) Transmission (auto/manual) Compliance date Kilometres Additions-BusinessSolutions@anu.edu.au Post auction report from Pickles received. Date (ie Sold at General Auction, passed-in etc) Cheque

Botea, Adi

339

Property:Event/Date | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Event/Date Jump to: navigation, search Property Name Event/Date Property Type Date Description The date on which an event occurs. Pages using the property "Event/Date" Showing 25 pages using this property. (previous 25) (next 25) 1 11th Annual Workshop on Greenhouse Gas Emission Trading + 3 October 2011 + 11th Annual Workshop on Greenhouse Gas Emission Trading Day 2 + 4 October 2011 + 15th International Business Forum: Low Carbon High Growth - Business Models for a Changing Climate + 21 October 2012 + 18th Africa Partnership Forum + 25 April 2012 + 2 2012 Bonn Climate Change Conference + 14 May 2012 + 7 7th Asia Clean Energy Forum + 4 June 2012 + A ASEAN Roadmapping Workshop + 2 June 2011 +

340

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-C 2-C NEPA ID No.: PXP-10-0004 Deactivation & Decommissioning of the North Compost Tent Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Environmental Restoration's (ER) North Compost Tent, which was damaged by a storm in 2003 and has not been fully operational since then. It is considered unsalvageable by the Facility & Systems Design Department. Demolition will consist of: Removal of clay soil (approximately 1 foot deep) and two liners (polyvinylchloride and

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Hybrid Electric Vehicle Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Transportation Association Conference Transportation Association Conference Vancouver, Canada December 2005 Hybrid Electric Vehicle Testing Jim Francfort U.S. Department of Energy - FreedomCAR & Vehicle Technologies Program, Advanced Vehicle Testing Activity INL/CON-05-00964 Presentation Outline * Background & goals * Testing partners * Hybrid electric vehicle testing - Baseline performance testing (new HEV models) - 1.5 million miles of HEV fleet testing (160k miles per vehicle in 36 months) - End-of-life HEV testing (rerun fuel economy & conduct battery testing @ 160k miles per vehicle) - Benchmark data: vehicle & battery performance, fuel economy, maintenance & repairs, & life-cycle costs * WWW information location Background * Advanced Vehicle Testing Activity (AVTA) - part of the

342

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-C 3-C NEPA ID No.: PXP-10-0007 Demolition of Buildings 11-10 and 11-30 Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Buildings 11-10 and 11-30 at the Pantex Plant. The overall objectives are to reduce Plant maintenance costs and reduce the Pantex Plant footprint by 3,144 square feet. Building 11-10 is approximately 929 square feet, single story, slab on grade, brick structure with a shingle roof. The interior of the building consists of only two rooms separated by a masonry wall. An asbestos

343

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-C 4-C NEPA ID No.: PXP-10-0008 Demolition of Building 12-2B Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposes to demolish Building 12-2B and reduce the Pantex Plant footprint by 3,181 square feet. Project tasks include preparing and approving Planning Documents, removing building furnishings and contents, cutting, capping, and rerouting utilities associated with the structure, razing the structure, reworking/closing masonry wall at door opening, recycling uncontaminated concrete and metal, disposing of waste, and backfilling and restoring the area

344

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-C 1-C NEPA ID No.: PXP-11-0002 HPFL Tank & Pump Replacement Application of DOE NEPA Procedure: Categorical Exclusion B1.15, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to this proposal. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activity described in NEPA Review Form (NRF) PXP-11-0002, which is hereby incorporated by reference. Rationale: The U.S. Department of Energy, National Nuclear Security Administration, proposes to construct and operate two new high pressure fire loop (HPFL) pump houses and tank facilities at the B&W Pantex Facility to replace aging existing facilities. Construction and staging areas would require approximately one acre of land disturbance for each facility.

345

Date Stamped/Typed Centered  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D&D-10-003-C D&D-10-003-C NEPA Amendment No.: 11-002 Demolition of Buildings 11-10 and 11-30 Application of DOE NEPA Procedure: Categorical Exclusion B1.23, Applicable to Facility Operations (10 CFR Part 1021, Subpart D, Appendix B), applies to the proposed activity described below. Rationale: The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), proposed to demolish Buildings 11-10 and 11-30 at the Pantex Plant, as described in NEPA Review Form (NRF) No. PXP-10-0007, which is hereby incorporated by reference. While removing the asphalt from the concrete slab at Building 11-30 during demolition, unknown concrete sumps, manholes, and drainage troughs were discovered. Removal of the sumps, manholes, and drainage troughs has been added to the scope of project no. D&D-10-003-

346

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-004278: Categorical Exclusion Determination Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon Dioxide CX(s) Applied: A9 Date: 10/19/2010 Location(s): Clarkstown, New York Office(s): Fossil Energy, National Energy Technology Laboratory October 19, 2010 CX-004275: Categorical Exclusion Determination Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part II CX(s) Applied: B3.7 Date: 10/19/2010 Location(s): Yale, Oklahoma Office(s): Fossil Energy, National Energy Technology Laboratory October 18, 2010 CX-004292: Categorical Exclusion Determination Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining Operation CX(s) Applied: A9, B3.1, B3.6

347

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2010 2, 2010 CX-001102: Categorical Exclusion Determination Recovery Act: Clemson University Wind Turbine Testing Facility CX(s) Applied: A9 Date: 03/02/2010 Location(s): North Charleston, South Carolina Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 2, 2010 CX-001037: Categorical Exclusion Determination Low-Cost Illumination Grade Light Emitting Diodes (LEDs) CX(s) Applied: B3.6, B5.1 Date: 03/02/2010 Location(s): San Jose, California Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 2, 2010 CX-001036: Categorical Exclusion Determination Solution Processable Transparent Conductive Hole Injection Electrode for Organic Light Emitting Diode (OLED) Solid State Lighting (Pennsylvania) CX(s) Applied: B3.6

348

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

349

Flow Test At Chena Area (Benoit, Et Al., 2007) | Open Energy Information  

Open Energy Info (EERE)

Chena Area (Benoit, Et Al., 2007) Chena Area (Benoit, Et Al., 2007) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Chena Area (Benoit, Et Al., 2007) Exploration Activity Details Location Chena Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References Dick Benoit, Gwen Holdmann, David Blackwell (2007) Low Cost Exploration, Testing, And Development Of The Chena Geothermal Resource Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Chena_Area_(Benoit,_Et_Al.,_2007)&oldid=387083" Category: Exploration Activities What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services OpenEI partners with a broad range of international organizations to grow

350

Flow Test At Raft River Geothermal Area (1979) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Raft River Geothermal Area (1979) Flow Test At Raft River Geothermal Area (1979) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Raft River Geothermal Area (1979) Exploration Activity Details Location Raft River Geothermal Area Exploration Technique Flow Test Activity Date 1979 Usefulness useful DOE-funding Unknown Exploration Basis To allow for the lateral and vertical extrapolation of core and test data and bridged the gap between surface geophysical data and core analyses. Notes Temperature and flowmeter logs provide evidence that these fractures and faults are conduits that conduct hot water to the wells. One of the intermediate depth core holes penetrated a hydrothermally altered zone that includes several fractures producing hot water. This altered production

351

Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983)  

Open Energy Info (EERE)

Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Exploration Activity Details Location Fenton Hill Hdr Geothermal Area Exploration Technique Injectivity Test Activity Date Usefulness not indicated DOE-funding Unknown References C. O. Grigsby, J. W. Tester, P. E. Trujillo, D. A. Counce, J. Abbott, C. E. Holley, L. A. Blatz (1983) Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field Investigations Of In Situ Geochemical Behavior Retrieved from "http://en.openei.org/w/index.php?title=Injectivity_Test_At_Fenton_Hill_Hdr_Geothermal_Area_(Grigsby,_Et_Al.,_1983)&oldid=511318

352

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination Cuyahoga County American Recovery and Reinvestment Act - Energy Efficiency and Conservation Block Grant (8) Act 3-Municipal Competitive Grant Program and Act 4-Energy Efficiency and Conservation Retrofits CX(s) Applied: A9, A11, B5.1 Date: 03/31/2010 Location(s): Cuyahoga County, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 31, 2010 CX-001563: Categorical Exclusion Determination Bergen County Retrofits CX(s) Applied: A9, A11, B5.1 Date: 03/31/2010 Location(s): Bergen County, New Jersey Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 31, 2010 CX-001556: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Activities Covered by

353

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2010 8, 2010 CX-000670: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant State of Illinois Categorical Exclusion Activities under the Illinois Association of Regional Councils (ILARC) CX(s) Applied: A9, A11, B5.1 Date: 02/08/2010 Location(s): Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 8, 2010 CX-000671: Categorical Exclusion Determination Massachusetts Program for Energy Efficiency and Conservation Block Grant Formula Funding CX(s) Applied: A9, A11, B5.1 Date: 02/08/2010 Location(s): Massachusetts Office(s): Energy Efficiency and Renewable Energy, Golden Field Office February 8, 2010 CX-000673: Categorical Exclusion Determination American Recovery and Reinvestment Act Energy Efficiency and Conservation

354

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-001673: Categorical Exclusion Determination City of San Antonio American Recovery and Reinvestment Act (ARRA) - Energy Efficiency and Conservation Block Grant (EECBG) Activity #9 CX(s) Applied: A11, B5.1 Date: 04/09/2010 Location(s): San Antonio, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 9, 2010 CX-001668: Categorical Exclusion Determination City of El Paso Landfill Gas Recovery Project American Recovery and Reinvestment Act (ARRA) - Energy Efficiency and Conservation Block Grant (EECBG) CX(s) Applied: B5.1 Date: 04/09/2010 Location(s): El Paso, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 9, 2010 CX-001671: Categorical Exclusion Determination City of Laredo, Texas American Recovery and Reinvestment Act (ARRA) -

355

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-004365: Categorical Exclusion Determination Small Business, Non-Profit and Higher Education Grant Program: Greater Elkhart Chamber of Commerce Ground Source Heat Pump CX(s) Applied: B5.1 Date: 11/01/2010 Location(s): Elkhart, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 1, 2010 CX-004364: Categorical Exclusion Determination Non-Entitlement Communities Energy Efficiency Activities City of Knox Open Loop Ground Source Heat Pump Project CX(s) Applied: B5.1 Date: 11/01/2010 Location(s): Knox, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 1, 2010 CX-004363: Categorical Exclusion Determination Small Business, Non-Profit and Higher Education Grant Program; Back to Wellness Center Geothermal System

356

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2010 1, 2010 CX-004367: Categorical Exclusion Determination Small Cities and Counties Initiative: Pendleton County Geothermal CX(s) Applied: B5.1 Date: 11/01/2010 Location(s): Pendleton County, Kentucky Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 1, 2010 CX-004365: Categorical Exclusion Determination Small Business, Non-Profit and Higher Education Grant Program: Greater Elkhart Chamber of Commerce Ground Source Heat Pump CX(s) Applied: B5.1 Date: 11/01/2010 Location(s): Elkhart, Indiana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 1, 2010 CX-004364: Categorical Exclusion Determination Non-Entitlement Communities Energy Efficiency Activities City of Knox Open Loop Ground Source Heat Pump Project

357

Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0  

SciTech Connect

This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D&D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities.

Olson, A.L.; Nacht, S.J.

1997-11-01T23:59:59.000Z

358

Testing for Bacteria  

NLE Websites -- All DOE Office Websites (Extended Search)

Testing for Bacteria Testing for Bacteria Name: Danielle Location: N/A Country: N/A Date: N/A Question: I have to do a science fair project. What I need to compare the relative bacterial levels in milk samples with different expiration dates. What can I use to test the bacteria? Please help! Replies: You want to see if there are bacteria present in milk of different expiration dates, and if so, what they do to the milk. So buy milk of different dates. You could test what effect storage temperature has on bacterial growth in milk. Use those different milk samples in their original package (don't open it!) and keep them at 37 degrees C, at room temperature, and in the fridge (measure how cold that is) for say 48 hrs.Then open the bottle or pack and see what happened to the milk. Do you see differences? Can you explain them? If you open the milk before the experiment you may get bacteria into the milk that otherwise would not have been there. The experiment with the closed bottles will tell you what is better, storage of milk at room temperature, warm, or cold.

359

Template:ExplorationActivity | Open Energy Information  

Open Energy Info (EERE)

ExplorationActivity ExplorationActivity Jump to: navigation, search This is the 'ExplorationActivity' template. To define a new Exploration Activity, please use the Exploration Activity Form. Parameters Name - The name of the activity (typically a combination of the techniques and location, ex. Water Sampling at McCredie Hot Springs) Technique - The exploration technique used in this activity SpectralSensor - The spectral imaging sensor used in this activity Place - The name of the exploration field or location of the activity Notes - General notes about the activity (optional) Outcome - A short description of the benefit or usefulness of the activity Reference_material - The reference material documenting the activity ExpActivityDate - Date or year activity started ExpActivityDateEnd - Date or year activity ended

360

Property:Date Submitted | Open Energy Information  

Open Energy Info (EERE)

Date Submitted Date Submitted Jump to: navigation, search Property Name Date Submitted Property Type String Pages using the property "Date Submitted" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + 45:22.0 + MHK Technologies/Aegir Dynamo + 47:39.7 + MHK Technologies/AirWEC + 3/2/2013 + MHK Technologies/Anaconda bulge tube drives turbine + 35:14.3 + MHK Technologies/AquaBuoy + 9/2/2010 + MHK Technologies/Aquanator + 9/28/2010 + MHK Technologies/Aquantis + 47:31.6 + MHK Technologies/Archimedes Wave Swing + 9/28/2010 + MHK Technologies/Atlantis AN 150 + 6/18/2012 + MHK Technologies/Atlantis AR 1000 + 6/18/2012 + MHK Technologies/Atlantis AS 400 + 6/18/2012 + MHK Technologies/Atlantisstrom + 51:25.6 + MHK Technologies/BOLT Lifesaver + 04:16.3 +

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Winter Study Rebate Form 2012 Date______________________________ ID #________________________________  

E-Print Network (OSTI)

Winter Study Rebate Form 2012 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

362

Winter Study Rebate Form 2013 Date______________________________ ID #________________________________  

E-Print Network (OSTI)

Winter Study Rebate Form 2013 Date______________________________ ID to receive your rebate? Credit term account______ EPH Dollars_______ WINTER STUDY REBATES ARE GIVEN 10 consecutive calendar days are entitled to a rebate Rebates will be calculated on a per day basis

Aalberts, Daniel P.

363

: H. Jack Elackwell, Area Manager, LAAO DATE:  

Office of Legacy Management (LM)

O.&E b.&AORANDti l > : H. Jack Elackwell, Area Manager, LAAO DATE: June 5, 1973 70 : ?ZH-Division Leader ,WE,T : ENVIRONMENTAL RADIOACTIVITY SURVEY OF LOS ALAMOS COMIMUNITY...

364

SAVE THE DATE!!! The Silicon Valley  

E-Print Network (OSTI)

SAVE THE DATE!!! The Silicon Valley 3rd Annual Social Innovation Leadership Forum 2014 (SILF 2014 towards a better tomorrow... Register for the event today! The Social Innovation Leadership Forum (SILF

Su, Xiao

365

Property:GEAReportDate | Open Energy Information  

Open Energy Info (EERE)

Pages using the property "GEAReportDate" Showing 1 page using this property. L Los Humeros III Geothermal Power Plant + 19 December 2013 + Retrieved from "http:en.openei.org...

366

Version Date: July 2012 COPYRIGHT & TRADEMARKS  

E-Print Network (OSTI)

WEB Clock Version Date: July 2012 #12;COPYRIGHT & TRADEMARKS Copyright © 1998, 2011, Oracle and Guide WEB Clock Page iii Table of Contents WEB Clock ........................................................................................................................ 1 WEB Clock Procedure

367

Enter Date: Enter NVLAP Lab Code: NIST HANDBOOK 150-10 CHECKLIST  

E-Print Network (OSTI)

Enter Date: Enter NVLAP Lab Code: NIST HANDBOOK 150-10 CHECKLIST EFFICIENCY OF ELECTRIC MOTORS prescribed in NIST Handbook 150-10, Efficiency of Electric Motors. The Test Method Review Summary, which is used to review the laboratory's ability to perform Efficiency of Electric Motors test methods

368

NO. REV. NO. Systems Division DATE  

E-Print Network (OSTI)

-~ NO. REV. NO. EATM-15 PAGE OF ~ Systems Division DATE EASEP /PSEP Solar Panel Development Design+"'--.:L'_;;;J....;::::::..··-=·~::!!:!!!e::...._ K. Hsi #12;NO. REV. NO. EATM-15 EASEP/PSEP Solar Panel Development ~ Systems Division Design of the EASE-PSEP Solar Panel Array~PA::G:,:E:..::=l=~o:F~=2=7= DATE 20 Nov. 1968 1. 0 SUMMARY Electrical power

Rathbun, Julie A.

369

Laboratory and Field Testing of Commercially Available Detectors for the Identification of Chemicals of Interest in the Nuclear Fuel Cycle for the Detection of Undeclared Activities  

SciTech Connect

Traditionally, IAEA inspectors have focused on the detection of nuclear indicators as part of infield inspection activities. The ability to rapidly detect and identify chemical as well as nuclear signatures can increase the ability of IAEA inspectors to detect undeclared activities at a site. Identification of chemical indicators have been limited to use in the analysis of environmental samples. Although IAEA analytical laboratories are highly effective, environmental sample processing does not allow for immediate or real-time results to an IAEA inspector at a facility. During a complementary access inspection, under the Additional Protocol, the use of fieldable technologies that can quickly provide accurate information on chemicals that may be indicative of undeclared activities can increase the ability of IAEA to effectively and efficiently complete their mission. The Complementary Access Working Group (CAWG) is a multi-laboratory team with members from Brookhaven National Laboratory, Idaho National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratory. The team identified chemicals at each stage of the nuclear fuel cycle that may provide IAEA inspectors with indications that proliferation activities may be occurring. The group eliminated all indicators related to equipment, technology and training, developing a list of by-products/effluents, non-nuclear materials, nuclear materials, and other observables. These proliferation indicators were prioritized based on detectability from a conduct of operations (CONOPS) perspective of a CA inspection (for example, whether an inspector actually can access the S&O or whether it is in process with no physical access), and the IAEAs interest in the detection technology in conjunction with radiation detectors. The list was consolidated to general categories (nuclear materials from a chemical detection technique, inorganic chemicals, organic chemicals, halogens, and miscellaneous materials). The team then identified commercial off the shelf (COTS) chemical detectors that may detect the chemicals of interest. Three chemical detectors were selected and tested both in laboratory settings and in field operations settings at Idaho National Laboratory. The instruments selected are: Thermo Scientific TruDefender FT (FTIR), Thermo Scientific FirstDefender RM (Raman), and Bruker Tracer III SD (XRF). Functional specifications, operability, and chemical detectability, selectivity, and limits of detection were determined. Results from the laboratory and field tests will be presented. This work is supported by the Next Generation Safeguards Initiative, Office of Nonproliferation and International Security, National Nuclear Security Administration.

Carla Miller; Mary Adamic; Stacey Barker; Barry Siskind; Joe Brady; Warren Stern; Heidi Smartt; Mike McDaniel; Mike Stern; Rollin Lakis

2014-07-01T23:59:59.000Z

370

Advanced Vehicle Testing Activity (AVTA)- Vehicle Testing and Demonstration Activities  

Energy.gov (U.S. Department of Energy (DOE))

2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

371

Underground test area subproject waste management plan. Revision No. 1  

SciTech Connect

The Nevada Test Site (NTS), located in southern Nevada, was the site of 928 underground nuclear tests conducted between 1951 and 1992. The tests were performed as part of the Atomic Energy Commission and U.S. Department of Energy (DOE) nuclear weapons testing program. The NTS is managed by the DOE Nevada Operations Office (DOE/NV). Of the 928 tests conducted below ground surface at the NTS, approximately 200 were detonated below the water table. As an unavoidable consequence of these testing activities, radionuclides have been introduced into the subsurface environment, impacting groundwater. In the few instances of groundwater sampling, radionuclides have been detected in the groundwater; however, only a very limited investigation of the underground test sites and associated shot cavities has been conducted to date. The Underground Test Area (UGTA) Subproject was established to fill this void and to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the NTS. One of its primary objectives is to gather data to characterize the deep aquifer underlying the NTS.

NONE

1996-08-01T23:59:59.000Z

372

RERTR program activities related to the development and application of new LEU fuels. [Reduced Enrichment Research and Test Reactor; low-enriched uranium  

SciTech Connect

The statue of the U.S. Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief outline of RERTR Program objectives and goals, program accomplishments are discussed with emphasis on the development, demonstration and application of new LEU fuels. Most program activities have proceeded as planned, and a combination of two silicide fuels (U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al) holds excellent promise for achieving the long-term program goals. Current plans and schedules project the uranium density of qualified RERTR fuels for plate-type reactors to grow by approximately 1 g U/cm/sup 3/ each year, from the current 1.7 g U/cm/sup 3/ to the 7.0 g U/cm/sup 3/ which will be reached in late 1988. The technical needs of research and test reactors for HEU exports are also forecasted to undergo a gradual but dramatic decline in the coming years.

Travelli, A.

1983-01-01T23:59:59.000Z

373

Vehicle Technologies Office: Active Solicitations  

NLE Websites -- All DOE Office Websites (Extended Search)

Active Solicitations to Active Solicitations to someone by E-mail Share Vehicle Technologies Office: Active Solicitations on Facebook Tweet about Vehicle Technologies Office: Active Solicitations on Twitter Bookmark Vehicle Technologies Office: Active Solicitations on Google Bookmark Vehicle Technologies Office: Active Solicitations on Delicious Rank Vehicle Technologies Office: Active Solicitations on Digg Find More places to share Vehicle Technologies Office: Active Solicitations on AddThis.com... Active Solicitations To explore current financial opportunity solicitations, click on the opportunity titles in the table below. To sort the list, click on the arrows in the column headings. Technology Solicitation Title Open Date Close Date Hydrogen and Fuel Cells Research and Development for Hydrogen Storage

374

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 CX-008770: Categorical Exclusion Determination Buried Power Line at Customer Operations Center CX(s) Applied: B1.3, B4.6, B4.12 Date: 06/08/2012 Location(s): Wyoming Offices(s): RMOTC June 8, 2012 CX-008816: Categorical Exclusion Determination Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5 Date: 06/08/2012 Location(s): Illinois Offices(s): New Brunswick Laboratory June 8, 2012 CX-008817: Categorical Exclusion Determination Indoor Bench Scale Research Projects and Conventional Laboratory Operations CX(s) Applied: B3.6 Date: 06/08/2012 Location(s): Illinois Offices(s): New Brunswick Laboratory June 8, 2012 CX-008544: Categorical Exclusion Determination

375

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2012 1, 2012 CX-009238: Categorical Exclusion Determination Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s): Legacy Management September 21, 2012 CX-009233: Categorical Exclusion Determination Flaming Gorge - Vernal 138 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/21/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region September 21, 2012 CX-009346: Categorical Exclusion Determination Pittsburgh B84 Roof Fall Protection CX(s) Applied: B2.1, B2.3 Date: 09/21/2012

376

Willard Libby, Radiocarbon, and Carbon Dating  

Office of Scientific and Technical Information (OSTI)

Willard Libby, Radiocarbon, and Carbon Dating Willard Libby, Radiocarbon, and Carbon Dating Resources with Additional Information · Radiocarbon Dating Willard Libby Courtesy UCLA Photography 'Scientific discoveries of various magnitudes are constantly occurring in myriad fields of study. It is a rarity, however, to make a breakthrough that not only has an impact on an individual field but also revolutionizes scientific thought across multiple disciplines. Willard Frank Libby accomplished this feat. Libby first proposed his idea of carbon dating in 1947 and over the next 12 years he researched and perfected the process. Libby discovered that when plants absorb carbon for photosynthesis they also absorb certain amounts of carbon-14. He deduced that when the plant dies, it no longer absorbs any of this carbon and that carbon-14 decays at a predictable rate. Libby found a way to determine the age of plant-based artifacts utilizing the decay rate of carbon-14. This process has been used to determine the age of mummies, prehistoric artifacts and dwellings. This dating technique has proven extremely valuable to earth scientists, archeologists, and anthropologists. '1

377

2014 NEJC Save the Date (Spanish) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 NEJC Save the Date (Spanish) 2014 NEJC Save the Date (Spanish) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

378

2014 NEJC Save the Date (English) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 NEJC Save the Date (English) 2014 NEJC Save the Date (English) 2014 National Environmental Justice Conference and Training Program Save the Date, March 26 to 28, 2014 Save the...

379

Presentations by Date | Merit Review Application  

NLE Websites -- All DOE Office Websites (Extended Search)

Presentations by Date Presentations by Date Friday May 17 2013 Title Presenting Organization Document Presentation date A MultiAir / MultiFuel Approach to Enhancing Engine System Efficiency Chrysler ace062_reese_2013_o.pdf 05/17/2013 Lean Gasoline System Development for Fuel Efficient Small Car General Motors ace063_smith_2013_o.pdf 05/17/2013 Gasoline Ultra Fuel Efficient Vehicle Delphi ace064_confer_2013_o.pdf 05/17/2013 Advanced Gasoline Turbocharged Direct Injection (GTDI) Engine Development Ford Motor Company ace065_weaver_2013_o.pdf 05/17/2013 Advanced Combustion Concepts - Enabling Systems and Solutions (ACCESS) for High Efficiency Light Duty Vehicles Robert Bosch ace066_yilmaz_2013_o.pdf 05/17/2013 ATP-LD; Cummins Next Generation Tier 2 Bin 2 Diesel Engine Cummins ace061_ruth_2013_o.pdf 05/17/2013

380

Geodetic Survey At Nevada Test And Training Range Area (Sabin, Et Al.,  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geodetic Survey At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Geodetic Survey Activity Date Usefulness not indicated DOE-funding Unknown Notes NAFR straddles the boundary of the Walker Lane belt and the Basin and Range extensional province. Neotectonic motions are inferred from GPS and seismic observations. GPS velocities indicate that the strain field changes from the east-west extension typical of the Basin and Range to the northwest-southeast-directed transtension characteristic of the Walker Lane belt across the region.

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Injectivity Test At Newberry Caldera Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Newberry Caldera Area (Combs, Et Al., 1999) Newberry Caldera Area (Combs, Et Al., 1999) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Injectivity Test At Newberry Caldera Area (Combs, Et Al., 1999) Exploration Activity Details Location Newberry Caldera Area Exploration Technique Injectivity Test Activity Date Usefulness useful DOE-funding Unknown Notes After circulating the mud out of the hole and replacing it with clear water, we attempted two injection tests; one into the open hole section (51 16'- 5360') below the HQ liner, and one into the annulus outside the uncemented part (2748' - -4800') of the liner. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr., Ronald D. Jacobsen, Gene Polik (1999) Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration

382

Flow Test At Long Valley Caldera Area (Farrar, Et Al., 2003) | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Flow Test At Long Valley Caldera Area (Farrar, Et Al., 2003) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Long Valley Caldera Area (Farrar, Et Al., 2003) Exploration Activity Details Location Long Valley Caldera Area Exploration Technique Flow Test Activity Date Usefulness useful DOE-funding Unknown Notes The pressure data collected during a 50-h-long flow test at LVEW in September 2001 are best matched using solutions for a flow system consisting of a steeply dipping fracture with infinite hydraulic conductivity, surrounded by a finite-conductivity rock matrix. At shallow

383

Flow Test At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) |  

Open Energy Info (EERE)

Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Exploration Activity Details Location Lassen Volcanic National Park Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown Notes Water samples were collected during nitrogen-stimulated flow tests in 1978, but no information was provided on sampling conditions. The well was flowed again for the last time in 1982, but the flow test lasted only 1 h (Thompson, 1985). References Cathy J. Janik, Marcia K. McLaren (2010) Seismicity And Fluid Geochemistry At Lassen Volcanic National Park, California- Evidence For Two

384

COS NUV TA1 Mirror Specification Date: December 8, 1999  

E-Print Network (OSTI)

Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling:........................................................................................ 3 3.4.3 Solvents

Colorado at Boulder, University of

385

COS NUV Grating Substrate Specification Date: August 20, 2001  

E-Print Network (OSTI)

Experiment Manager, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center/Handling: ............................................................................................3 3.4.3 Solvents.........................................................................................................

Colorado at Boulder, University of

386

COS Coating Reflectivity Specification Date: August 2, 1999  

E-Print Network (OSTI)

Project Scientist, CU/CASA Date Approved By: J. C. Green, COS Principal Investigator, CU/CASA Date Center .................................................................................. 4 4.1.1 Solvents

Colorado at Boulder, University of

387

NO. REV. NO. LSPE THERMAL BATTERY TEST  

E-Print Network (OSTI)

NO. REV. NO. ATM 1086 LSPE THERMAL BATTERY TEST PAGE 1 OF DATE 2/25/72 Prepared by @c!_.e,~.~ ~P. Weir Approved by ~~---:J L. Lewis 5 #12;KC::Y, NO. LSPE THERMAL BATTERY TEST ATM 1086 2 PAGE OF DATE 2-52-72 Introduction The purpose of this ATM is to document the results of a Thermal Battery test for the Lunar Seismic

Rathbun, Julie A.

388

Flow Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) | Open  

Open Energy Info (EERE)

Grigsby, Et Al., 1983) Grigsby, Et Al., 1983) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Fenton Hill Hdr Geothermal Area (Grigsby, Et Al., 1983) Exploration Activity Details Location Fenton Hill Hdr Geothermal Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown References C. O. Grigsby, J. W. Tester, P. E. Trujillo, D. A. Counce, J. Abbott, C. E. Holley, L. A. Blatz (1983) Rock-Water Interactions In Hot Dry Rock Geothermal Systems- Field Investigations Of In Situ Geochemical Behavior Retrieved from "http://en.openei.org/w/index.php?title=Flow_Test_At_Fenton_Hill_Hdr_Geothermal_Area_(Grigsby,_Et_Al.,_1983)&oldid=511312" Category: Exploration Activities What links here Related changes

389

Re-release Date: August 13, 2013  

U.S. Energy Information Administration (EIA) Indexed Site

Re-release Date: August 13, 2013" Re-release Date: August 13, 2013" "Table 27. Estimated rail transportation rates for coal, state to state, EIA data" ,,"Nominal Dollars per Ton",,,,"Annual Percent Change" "Origin State","Destination State",2008,2009,2010,," 2008-2010"," 2009-2010" "Alabama","Alabama"," $14.43"," $13.59"," $15.46",, 3.5, 13.8 "Alabama","Georgia"," $19.13"," $19.58"," $22.30",, 8.0, 13.9 "Alabama","Kentucky"," -"," W"," -",," -"," -" "Alabama","New Jersey"," W"," -"," -",," -"," -"

390

Computational Age Dating of Special Nuclear Materials  

SciTech Connect

This slide-show presented an overview of the Constrained Progressive Reversal (CPR) method for computing decays, age dating, and spoof detecting. The CPR method is: Capable of temporal profiling a SNM sample; Precise (compared with known decay code, such a ORIGEN); Easy (for computer implementation and analysis). ? We have illustrated with real SNM data using CPR for age dating and spoof detection. If SNM is pure, may use CPR to derive its age. If SNM is mixed, CPR will indicate that it is mixed or spoofed.

None

2012-06-30T23:59:59.000Z

391

activity | OpenEI  

Open Energy Info (EERE)

activity activity Dataset Summary Description The Weekly Financial and Activity report section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act. The "Weekly Update" tab includes listing of total appropriations, total obligations, and total disbursements for each Treasury Account. The "Major Activities" tab lists of the major actions taken to date and major planned actions of likely interest to senior government officials, Congress, and the public. File is in .xls format. Source DOE Date Released November 19th, 2010 (4 years ago) Date Updated Unknown Keywords activity DOE financial Recovery Act report Data application/vnd.ms-excel icon DOE_Weekly_Financial_and_Activity_Report_20101119.xls (xls, 1.8 MiB)

392

DATE : NVLAP LAB CODE: NVLAP EFFICIENCY OF ELECTRIC MOTORS APPLICATION (REV. 2013-06-11) PAGE 1 OF 1  

E-Print Network (OSTI)

DATE : NVLAP LAB CODE: NVLAP EFFICIENCY OF ELECTRIC MOTORS APPLICATION (REV. 2013-06-11) PAGE 1 OF 1 EFFICIENCY OF ELECTRIC MOTORS TEST METHOD SELECTION LIST Instructions: Check each test method, Method B, on electric motors rated: ________ to ________ horsepower. ____ 24/M02* IEEE 114 Test Procedure

393

Queen's University Environmental Health & Safety Date Issued  

E-Print Network (OSTI)

Queen's University Environmental Health & Safety Date Issued: November 27, 2013 Page No.: 1: The Department of Environmental Health & Safety 1.0 Introduction Queen's University acknowledges that the use of the Aboriginal culture and heritage. This standard operating procedure outlines the University's guidelines

Graham, Nick

394

Proposed Start Date: Title of Project  

E-Print Network (OSTI)

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

395

2011 TRAINING DATES January 10-12  

E-Print Network (OSTI)

2011 TRAINING DATES January 10-12 March 1-3 April 11-13 June 7-9 July 26-28 September 6-8 November: Tools and Functionality Professional Development Training Course OVERVIEW ArcGIS Desktop II: Tools come- first serve basis. · The workshop registration cost is $650. Payment is due prior to the training

396

CURRICULUM VITAE DATE PREPARED: September 5, 2007  

E-Print Network (OSTI)

CURRICULUM VITAE DATE PREPARED: September 5, 2007 PART I: General Information Education 2000- Organization for Human Brain Mapping (OHBM), Member HMS Curriculum Vitae Page 1 of 14 #12;2005- Society for Neuroscience (SFN), Member HMS Curriculum Vitae Page 2 of 14 #12;Part II: Research, Teaching

Boas, David

397

Photo Contest Closing date 2013 9 19  

E-Print Network (OSTI)

2013 About Photo Contest Closing date 2013 9 19 Photo Contest Eligibility International) (8MB ) By E-Mail (Maximum size 8MB per photo, up to 2 photos) kisc-koryu@edu.kobe-u.ac.jp 2) CD-R () By Post or submit by hand to KISC Photos (up to 2 photos) burned on a CD-R. Note that your data

Banbara, Mutsunori

398

SAVE THE DATE! Saskatchewan Epidemiology Association  

E-Print Network (OSTI)

SAVE THE DATE! Saskatchewan Epidemiology Association Annual Fall Symposium & Workshop November 9 look forward to presentations by: Saskatchewan's Chief Medical Health Officer, Dr. Moira Mc of Regina ­ expert in climate change on the prairies Saskatchewan-based veterinarian ­ name to be announced

Saskatchewan, University of

399

Date ______________________ New York City Fire Department  

E-Print Network (OSTI)

familiar with the fire protection and fire suppression systems in the premises where heDate ______________________ New York City Fire Department Bureau of Fire Prevention 9 Metro received training in 3RCNY §10-01, Fire Code Sections 2701 - 2703 & 2706, the New C-14 study material

Jia, Songtao

400

Lorem & Ipsum [Insert Date \\ Issue] EQUINEBOOSTERSOFMSU  

E-Print Network (OSTI)

] Check out the MSU Colt Starting Class on Facebook! Keep up to date on the progress of our students the know-how and the connections with buyers across the United States. Headwaters Livestock, located in Three Forks, MT holds cattle sales every Monday and horse sales as announced. Special feeder, stock cow

Dyer, Bill

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Announced United States nuclear tests, July 1945--December 1990  

SciTech Connect

This document lists chronologically and alphabetically by event name all nuclear tests conducted and announced by the United States from July 1945 to December 1990 with the exception of the GMX experiments. Discussion is included on test dates, test series, test yields, test locations, test types and purposes, test totals for Nevada Test Site (NTS) detection of radioactivity from NTS events, and categorization of NTS nuclear tests. Briefly discussed are agreements between the US and the Soviet Union regarding test banning. (MB)

Not Available

1991-01-01T23:59:59.000Z

402

Date of Birth Declaration Office of the Registrar  

E-Print Network (OSTI)

that shows your birth date. (Examples: Driver's License, Birth Certificate, Passport, court or other legalDate of Birth Declaration Office of the Registrar http://registrar.wisc.edu OFFICE USE ONLY Date Date of Birth Month: Day: Year: By my signature, I hereby claim that my correct day of birth

Yavuz, Deniz

403

Save the Date - June 17-21 is National Small Business Week | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date - June 17-21 is National Small Business Week Save the Date - June 17-21 is National Small Business Week Save the Date - June 17-21 is National Small Business Week May 30, 2013 - 1:49pm Addthis Save the Date - June 17-21 is National Small Business Week The U.S. Small Business Administration is proud to announce that its signature event, National Small Business Week, will be held June 17th through June 21st. This year's events will take place all across the country and feature exciting and informative events designed to help small businesses start, grow and succeed. This year's activities will include forums discussing the small business landscape, business coaching services, matchmaking events as well as networking opportunities and award ceremonies. The week's events culminate in Washington where the 2013 National Small Business Person of

404

Save the Date - June 17-21 is National Small Business Week | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Save the Date - June 17-21 is National Small Business Week Save the Date - June 17-21 is National Small Business Week Save the Date - June 17-21 is National Small Business Week May 30, 2013 - 1:49pm Addthis Save the Date - June 17-21 is National Small Business Week The U.S. Small Business Administration is proud to announce that its signature event, National Small Business Week, will be held June 17th through June 21st. This year's events will take place all across the country and feature exciting and informative events designed to help small businesses start, grow and succeed. This year's activities will include forums discussing the small business landscape, business coaching services, matchmaking events as well as networking opportunities and award ceremonies. The week's events culminate in Washington where the 2013 National Small Business Person of

405

Fischer Tropsch synthesis : influence of Mn on the carburization rates and activities of Fe-based catalysts by TPR-EXAFS/XANES and catalyst testing.  

SciTech Connect

Fe-based catalysts containing different amounts of Mn were tested for Fischer-Tropsch synthesis using a stirred tank reactor at 270 C, 1.21 MPa, and H{sub 2}:CO = 0.7. Catalyst activation by carburization with 10% CO/He was followed by Temperature Programmed Reduction/X-ray Absorption Spectroscopy (TPR-EXAFS/XANES) from room temperature to 300 C. {gamma}-Fe{sub 2}O{sub 3} was converted into iron carbides, whereas MnO{sub x} was reduced to oxygen deficient MnO. Mn hindered Fe carburization, such that the carburized catalyst displayed higher Fe{sub 3}O{sub 4} content than the catalyst without Mn. EXAFS fitting indicates that the carburized catalyst contained a mixture of Hgg carbide, Fe{sub 3}O{sub 4}, and Mn oxides. Increasing Mn content led to higher CH{sub 4} and light product selectivities, and lower light olefin selectivities. Higher and stable conversions were obtained with a catalyst containing an almost equimolar Fe/Mn ratio relative to the catalyst without Mn. Selectivity trends are attributed to the higher WGS rates observed on the FeMn catalysts, consistent with the structural differences observed.

Ribeiro, M. C.; Jacobs, G.; Pendyala, R.; Davis, B. H.; Cronauer, D. C.; Kropf, A. J.; Marshall, C. L. (Chemical Sciences and Engineering Division); (Univ. of Kentucky)

2011-03-24T23:59:59.000Z

406

Property:StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate" StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 April 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 August 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 December 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 February 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 January 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 January 2009 +

407

Research Highlights Sorted by Submission Date  

NLE Websites -- All DOE Office Websites (Extended Search)

Submission Date Submission Date January 2014 Forecast Calls for Better Models: Examining the Core Components of Arctic Clouds to Clear Their Influence on Climate ARM ASR Ovink, J. December 2013 Effect of Environmental Instability on the Sensitivity of Convection to the Rimed Ice Species ASR Van Weverberg, K. All Mixed Up-Probing Large and Small Scale Turbulence Structures in Continental Stratocumulus Clouds ARM ASR Fang, M., Albrecht, B. A. Ground Stations Likely Get a Boost from Satellites to Estimate Carbon Dioxide Emissions ARM Roeder, L. R. November 2013 Spectro-microscopic Measurements of Carbonaceous Aerosol Aging in Central California ARM ASR Gilles, M., Moffet, R. Digging Into Climate Models' Needs with SPADE ARM ASR Gustafson, W. I. Nailing Down Ice in a Cloud Model ARM ASR

408

Property:EndDate | Open Energy Information  

Open Energy Info (EERE)

using the property "EndDate" using the property "EndDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - April 2008 + 1 May 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - August 2008 + 1 September 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - December 2008 + 1 January 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2008 + 1 March 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - February 2009 + 1 March 2009 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2008 + 1 February 2008 + 4-County Electric Power Assn (Mississippi) EIA Revenue and Sales - January 2009 + 1 February 2009 +

409

Evaluation of the commercial FBR introduction date  

SciTech Connect

This report examines one criterion for introducing a commercial FBR: economic competitiveness with a Light Water Reactor (LWR). For this analysis, the commercial FBR is assumed to be the fifth-of-a kind replicate which represents an economically mature plant. This FBR is deemed economically competitive when its life-cycle energy cost is less than or equal to that of an LWR. Results of this analysis are used in a comparative analysis of alternative FBR development stategies. The strategies evaluated in these studies assume both 1000- and 1457-MWe FBRs. Since the capital costs per kilowatt, and therefore the energy costs, for these two FBR sizes are different, they will become economically competitive at different times. The probability density function for the 1457-MW(e) FBR has an expected value date or weighted average date of 2030, compared with 2033 for the probability density function for the 1000-MW(e) FBR.

White, M.K.; Merrill, E.T.

1981-09-01T23:59:59.000Z

410

Application of dating for searching geothermic sources  

Science Journals Connector (OSTI)

A Geothermical field is usually associated with a volcanic region and, therefore, with an abundance of volcanic glasses such as obsidians. The magmatic chambers constitute an excellent source of heat for a geothermical system. These chambers can be geologically identified from the surface by its recent volcanic products. Therefore, the geological age of the volcanic units is of great interest for a location of a worthwile thermal energy field. This paper presents some preliminary results of the ages obtained by dating obsidians.

L. Gutirrez-Negrin; A. Lpez-Martnez; M. Balczar-Garca

1984-01-01T23:59:59.000Z

411

Position Description Report Run Date Aug 28 2013 10:03AM  

E-Print Network (OSTI)

developer in all phases of analysis, design, implementation, testing, and integration of cloud applicationsPosition Description Report Run Date Aug 28 2013 10:03AM Position Number: 02015821 Dept: IET APPLICATION DEVELOPMENT - 061419 Position: SENIOR CLOUD INTEGRATION LEAD Approved Payroll Title Code: 7289

California at Davis, University of

412

Position Description Report Run Date Aug 28 2013 2:46PM  

E-Print Network (OSTI)

of analysis, design, implementation, testing, and integration of applications supported by EAISPosition Description Report Run Date Aug 28 2013 2:46PM Position Number: TBD Dept: IET APPLICATION DEVELOPMENT - 061419 Position: APPLICATION DEVELOPER Approved Payroll Title Code: TBD Approved Payroll Title

California at Davis, University of

413

Aerial Photography At Nevada Test And Training Range Area (Sabin, Et Al.,  

Open Energy Info (EERE)

2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aerial Photography At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Aerial Photography Activity Date Usefulness not indicated DOE-funding Unknown Notes We re-examined most of the area using newer orthophotography, SPOT, and Thematic Mapper images, and identified several areas of possible late Quaternary surface faulting (Figure 3). References A. E. Sabin, J. D. Walker, J. Unruh, F. C. Monastero (2004) Toward The Development Of Occurrence Models For Geothermal Resources In The Western United States Retrieved from "http://en.openei.org/w/index.php?title=Aerial_Photography_At_Nevada_Test_And_Training_Range_Area_(Sabin,_Et_Al.,_2004)&oldid=386843

414

Modeling-Computer Simulations At Nevada Test And Training Range Area  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Modeling-Computer Simulations At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Modeling-Computer Simulations Activity Date Usefulness not indicated DOE-funding Unknown Notes Nellis Air Force Range (NAFR) occupies over 3 million acres in southern Nevada (Figure 1). We recently assessed potential utility-grade geothermal

415

Flow Test At Lake City Hot Springs Area (Warpinski, Et Al., 2004) | Open  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Flow Test At Lake City Hot Springs Area (Warpinski, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Lake City Hot Springs Area (Warpinski, Et Al., 2004) Exploration Activity Details Location Lake City Hot Springs Area Exploration Technique Flow Test Activity Date Usefulness not indicated DOE-funding Unknown Notes The Lake City site, which is located in far northeastern California, consists of a previously identified geothermal site that has been explored with both geophysics and drilling (Hedel, 1981), but has not been

416

Injectivity Test At Reese River Area (Henkle & Ronne, 2008) | Open Energy  

Open Energy Info (EERE)

Reese River Area (Henkle & Ronne, Reese River Area (Henkle & Ronne, 2008) Exploration Activity Details Location Reese River Area Exploration Technique Injectivity Test Activity Date Usefulness not indicated DOE-funding Unknown Notes On March 22, 2007 a brief injectivity test was preformed after the slotted liner had been installed. Water was injected at flow rates of 6.3 l/s, 13 l/s and 19 l/s and the pressure and temperature was recorded down hole at a depth of 926 m. At the higher flow rate, the test was interrupted several times to repair leaks at the surface. From the recorded pressure an approximate injectivity index of 10 l/s/MPa was calculated. References William R. Henkle, Joel Ronne (2008) Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling And Testing Retrieved from

417

Injectivity Test At Vale Hot Springs Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Vale Hot Springs Area (Combs, Et Vale Hot Springs Area (Combs, Et Al., 1999) Exploration Activity Details Location Vale Hot Springs Area Exploration Technique Injectivity Test Activity Date Usefulness useful DOE-funding Unknown Notes Analysis of the two injection tests performed at the exploration slimhole site during May, 1995 yielded estimates for the permeability-thickness product (transmissivity) kh of 0.25 and 0.23 Da-fi, based on pressure fall off after injection (see Section IV-a). Using the pressure buildup for the second test, a transmissivity of 0.610 Da-ft was estimated. These estimates are approximately an order of magnitude smaller than the kh values estimated for the nearby A-Alt well which was tested in 1994. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr.,

418

Home Energy Score: Analysis & Improvements to Date  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Home Energy Score: Home Energy Score: � Analysis & Improvements to Date � Joan Glickman Senior Advisor/Program Manager U.S. Department of Energy July 24, 2012 1 eere.energy.gov Presentation Overview 1) Background 2) Program Improvements 3) Analysis: Efficacy of Tool & Program - Asset Perturbations - Behavior Perturbations - Estimated Energy Use vs. Actual Energy Use (from utility bills) - Time Required for Assessment and Scoring - Blower Door Test Analysis 4) Next Steps & Ongoing Analysis 2 eere.energy.gov 1. Background � 3 eere.energy.gov Guiding Principles * Information must be credible, reliable, and replicable. * Information must be transparent and easy to understand. � * Implementation costs must be affordable. * Program must include effective quality assurance.

419

CERTS Microgrid Laboratory Test Bed - PIER Final Project Report  

E-Print Network (OSTI)

of AEPSC. DTC Registered Procedure CERTS Microgrid Test PlanTarget Group: Assigned Procedure Review Date: 23 Feb. 2008document is to establish procedures for testing of the CERTS

Eto, Joseph H.

2008-01-01T23:59:59.000Z

420

HSPD-12 Implementation Status Report Updated Date:  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Status Report Implementation Status Report Updated Date: Number of Employees requiring PIV credentials* Number of Employees requiring a NACI (or at least equivalent) that have not previously undergone a background check* Number of Employees requiring a NACI (or at least equivalent) with background investigation in process* Number of Employees with completed/adjudicated NACI (or equivalent background investigation)* Total Number of PIV credentials Issued to Employees* Number of Contractors requiring PIV credentials Number of Contractors requiring NACIs (or at least equivalent) that have not previously undergone a background check Number of Contractors requiring a NACI (or at least equivalent) with background investigation in process Number of Contractors with

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

AVTA: Chevrolet Malibu HEV 2013 Testing Results | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chevrolet Malibu HEV 2013 Testing Results AVTA: Chevrolet Malibu HEV 2013 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on...

422

AVTA: Quantum Escape PHEV Testing Results | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quantum Escape PHEV Testing Results AVTA: Quantum Escape PHEV Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide...

423

AVTA: Hyundai Sonata HEV 2011 Testing Results | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hyundai Sonata HEV 2011 Testing Results AVTA: Hyundai Sonata HEV 2011 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a...

424

AVTA: Honda Insight HEV 2010 Testing Results | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Honda Insight HEV 2010 Testing Results AVTA: Honda Insight HEV 2010 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a...

425

Summary of Construction Activities and Results from Six Initial Accelerated Pavement Tests Conducted on Asphalt Concrete Pavement Section for Modified-Binder Overlay  

E-Print Network (OSTI)

tests in terms of DCP penetration rates in the aggregatewere extracted. Average penetration rates m across section mmix gradations. Penetration Rate, mm/blow count Station, m

Bejarano, Manuel O.; Morton, Bruce S.; Scheffy, Clark

2005-01-01T23:59:59.000Z

426

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator  

E-Print Network (OSTI)

Predicted 2014 Apple Harvest Dates Phillip Schwallier, District Horticulture Educator Amy Irish. This moderate to heavy crop will mature close predicted dates. Blocks with light croploads will mature 3 or 4

427

Property:Incentive/StartDate | Open Energy Information  

Open Energy Info (EERE)

StartDate StartDate Jump to: navigation, search Property Name Incentive/StartDate Property Type Date Description Start Date. In order to see all values for this property, Property:Incentive/StartDateString should be used in queries until only valid dates are in this property. Currently, some entries include notes after the date or are just notes. Subproperties This property has the following 50 subproperties: A Alcohol Fuels Exemption (Hawaii) Alternative Energy Personal Property Tax Exemption (Michigan) Anne Arundel County - Solar and Geothermal Equipment Property Tax Credits (Maryland) B Broward County - Energy Sense Appliance Rebate Program (Florida) C CCEF - Commercial, Industrial, Institutional PV Grant Program (Connecticut) California Solar Initiative - Solar Thermal Program (California)

428

Active dc filter for HVDC system--A test installation in the Konti-Skan DC link at Lindome converter station  

SciTech Connect

The purpose of introducing active dc filters is to meet the more and more stringent requirement from power utilities on limiting telephone interference caused by harmonic currents from HVdc transmission lines, without unnecessarily increasing the cost of HVdc stations. An active dc filter installed in the Konti-Skan HVdc link is described. The active dc filter is connected at the bottom of an existing passive dc filter at the Lindome station. The active dc filter includes optic harmonic current measuring unit, control system, protection and supervision system, PWM power amplifier, high-frequency transformer, surge arrester, and coupling apparatuses. The active dc filter has small physical size and occupies small ground area. The performance of the active dc filter for eliminating the disturbing harmonics is excellent. To achieve comparable results by passive filters would require something like ten times more high voltage equipment.

Zhang, Wenyan; Asplund, G. (ABB Power Systems, Ludvika (Sweden). HVDC Division); Aberg, A. (ABB Corporate Research, Lund (Sweden). Dept. of Man-Machine Communication); Jonsson, U. (Svenska Kraftnaet, Vaellingby (Sweden)); Loeoef, O. (Vattenfall AB, Trollhaettan (Sweden). Region Vaestsverige)

1993-07-01T23:59:59.000Z

429

AHAM- CCE Overview and Update, dated 06/07/2011  

Energy.gov (U.S. Department of Energy (DOE))

This document is U.S. Department of Energy's presentation titled "AHAM - CCE Overview and Update", dated June 7, 2011.

430

2012 -2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network (OSTI)

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2012 - 2013 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

431

2013 -2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID  

E-Print Network (OSTI)

an official copy of your Birth Certificate, Passport, or Driver's License with this form and we will update2013 - 2014 BIRTH DATE VERIFICATION STUDENT NAME: SPU ID: The date of birth reported on your Free Application for Federal Student Aid (FAFSA) does not match the date of birth reported in one of the following

Nelson, Tim

432

Student ID Number Date of birth Cell Phone  

E-Print Network (OSTI)

Name Student ID Number Date of birth Cell Phone New Housing Student Current Housing Student All's phone Crime 2 Information about charges or crime convicted of Date of conviction Court convicted in Sentence received Probation dates Probation officer's name Probation officer's phone Consent: I authorize

Pantaleone, Jim

433

Title/Loc/Date: Slide # 1 Jo EllisMonaghan  

E-Print Network (OSTI)

Title/Loc/Date: Slide # 1 Jo Ellis­Monaghan e­mail: joellis@emba.uvm.edu website: http://academics.smcvt.edu/jellis­monaghan #12; Title/Loc/Date: Slide # 2 29(59,(:# . First some problems (network reliability, scheduling; Title/Loc/Date: Slide # 3 6RPH#3UHOLPLQDULHV# # 'HOHWLRQ

Ellis-Monaghan, Joanna

434

Range Creek Calibrated Dates Beta-202190  

E-Print Network (OSTI)

remains of a shallow pit structure. Testing revealed chunks of burned adobe, many with structural Boomgarden for comments and suggestions Figure 5 4. Results for Feature C Feature C (Figure 4) is the burned impressions, and burned beams above the unprepared floor. Testing also yielded 15 artifacts, mostly late stage

Provancher, William

435

DOE/EA-1494; Final Environmental Assessment for Activities Using Biological Simulants and Releases of Chemicals at the Nevada Test Site (June 2004)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

494 FINAL ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES 494 FINAL ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES USING BIOLOGICAL SIMULANTS AND RELEASES OF CHEMICALS June 2004 v Table of Contents Section Page ACRONYMS AND ABBREVIATIONS.................................................................................................. viii GLOSSARY ................................................................................................................................. GL-1 EXECUTIVE SUMMARY .....................................................................................................................ES-1 CHAPTER 1.0 PURPOSE AND NEED FOR ACTION..................................................................... 1-1 1.1 Introduction.................................................................................................................

436

Flow Test | Open Energy Information  

Open Energy Info (EERE)

Flow Test Flow Test Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Flow Test Details Activities (38) Areas (33) Regions (1) NEPA(3) Exploration Technique Information Exploration Group: Downhole Techniques Exploration Sub Group: Well Testing Techniques Parent Exploration Technique: Well Testing Techniques Information Provided by Technique Lithology: Stratigraphic/Structural: Hydrological: Flow tests provide information on permeability, recharge rates, reservoir pressures, fluid chemistry, and scaling. Thermal: Flow tests can measure temperature variations with time to estimate characteristics about the heat source. Dictionary.png Flow Test: Flow tests are typically conducted shortly after a well has been drilled to test its productivity. The well is opened and fluids are released, the

437

United States Government Department of Energy DATE:  

Office of Legacy Management (LM)

kE FJ325.8 d& * 9 -1 kE FJ325.8 d& * 9 -1 . (8-89) ZFG fO7440 1 United States Government Department of Energy DATE: DEC 2 3 :gg3 REPLY TO ATTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program TO: The File I have reviewed the attached site summaries and elimination recommendations for the following sites: e l Mitts & Merrel Co., Saginaw, Michigan l North Carolina State University, Raleigh, North Carolina l National Smelt & Refining, Cleveland, Ohio l Sutton, Steele & Steele, Dallas, Texas --------+. Norfolk Naval Station, Virginia In each case, the potential for radiological contamination above applicable guidelines is small. In each case the amounts of radioactive materials handled was small. Based on these considerations, these sites

438

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the NSLS-II Project Management of the NSLS-II Project OAS-RA-L-10-01 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy Memorandum DATE: April 6, 2010 Audit Report Number: OAS-RA-L-10-01 REPLY TO ATTN TO: IG-32 (A10RA006) SUBJECT: Report on "The Department of Energy's Management of the NSLS-II Project" TO: Manager, Brookhaven Site Office, SC-BHSO INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing

439

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Infrastructure Department's Infrastructure Modernization Projects under the Recovery and Reinvestment Act of 2009 OAS-RA-L-11-04 March 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 2, 2011 Audit Report Number: OAS-RA-L-11-04 REPLY TO ATTN OF: IG-34 (A10RA032) SUBJECT: Report on "The Department's Infrastructure Modernization Projects under the American Recovery and Reinvestment Act of 2009" TO: Manager, Oak Ridge Office Manager, Berkeley Site Office INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009. The goals of the Recovery Act are to retain or create jobs, increase

440

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act OAS-RA-L-10-04 April 2010 DOE F 1325.8 (4/93) United States Government Department of Energy memorandum DATE: April 27, 2010 Audit Report Number: OAS-RA-L-10-04 REPLY TO ATTN TO: IG-32 (A10RA025) SUBJECT: Report on "Progress in Implementing the Advanced Batteries and Hybrid Components Program under the American Recovery and Reinvestment Act" TO: Deputy Assistant Secretary, Energy Efficiency and Renewable Energy INTRODUCTION AND OBJECTIVE The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted to

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup Project OAS-RA-L-10-03 April 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 23, 2010 Audit Report Number: OAS-RA-L-10-03 REPLY TO ATTN OF: IG-34 (A09ID019) SUBJECT: Report on "Moab Mill Tailings Cleanup Project" TO: Deputy Assistant Secretary, Program and Site Support, EM-50 INTRODUCTION AND OBJECTIVE The Moab Uranium Mill Tailings Remedial Action Project (Moab Project) is located at a former uranium-ore processing facility near Moab, Utah on the west bank of the Colorado River. In 2005, the Department of Energy (Department) issued a Record of Decision to relocate, by rail, approximately 16 million tons of uranium mill tailings from

442

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Science's Energy Frontier Office of Science's Energy Frontier Research Centers OAS-RA-L-10-09 August 2010 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: August 27, 2010 Audit Report Number: OAS-RA-L-10-09 REPLY TO ATTN OF: IG-32 (A10RA003) SUBJECT: Audit Report on "Office of Science's Energy Frontier Research Centers" TO: Associate Director, Office of Basic Energy Sciences, SC-22 INTRODUCTION AND OBJECTIVE In 2008, the Department of Energy's (Department) Office of Science (Science) issued a Funding Opportunity Announcement seeking applications from the scientific community for the establishment of Energy Frontier Research Centers (EFRCs). The purpose of the EFRCs is to integrate the talent and expertise of leading scientists to accelerate the rate of

443

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of the Tank Farm Management of the Tank Farm Recovery Act Infrastructure Upgrades Project OAS-RA-L-11-03 February 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: February 9, 2011 Audit Report Number: OAS-RA-L-11-03 REPLY TO ATTN OF: IG-34 (A10RA043) SUBJECT: Report on "Management of the Tank Farm Recovery Act Infrastructure Upgrades Project" TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act) the Department of Energy (Department) awarded Washington River Protection Solutions (WRPS) approximately $324 million to accelerate completion of infrastructure upgrades for the Hanford Site's tank farms during the Fiscal Year (FY) 2009-2011 timeframe. These funds

444

DOE-EA-1184 Date Prepared:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

184 184 Date Prepared: Prepared by: Environmental Assessment for the Trunsfer of the DPRodd T~uct to the County of Los AIumos Los Alamos, New Mexico Final Document January 23,1997 US Department of Energy Los Alamos Area Office DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or use- fulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any spe- cific commercial product, process, or service by trade name, trademark, manufac-

445

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Management of Cloud Department's Management of Cloud Computing Services OAS-RA-L-11-06 April 2011 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: April 1, 2011 Audit Report Number: OAS-RA-L-11-06 REPLY TO ATTN OF: IG-34 (A11TG021) SUBJECT: Report on "Department's Management of Cloud Computing Services" TO: Administrator, National Nuclear Security Administration Acting Under Secretary of Energy Under Secretary for Science Chief Information Officer INTRODUCTION AND OBJECTIVE Cloud computing enables convenient, on-demand access to shared computing resources that can be rapidly provided to users. According to the National Institute of Standards and Technology (NIST) and industry experts, benefits of the cloud computing model include the

446

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Audit Report Summary of Audit Report National Nuclear Security Administration's Use of Innovative Technologies to Meet Security Requirements This document provides a summary of an Audit Report that is not publicly releasable. Public release is controlled pursuant to the Freedom of Information Act OAS-L-09-02 October 2008 The following is a summary o f a Special Access Unclassified Controlled Nuclear Information Audit Report, OAS-L-09-02, dated October 31, 2008, entitled "National Nuclear Security Administration's Use o f Innovative Technologies to Meet Security Requirements. The com~lete report is not available for public disclosure. BACKGROUND The Department of Energy (Department) developed the Design Basis Threat policy (DBT), which identified the most credible threats posed by potential adversaries to Departmental assets and

447

2013 Course Dates Sept. 11-13  

E-Print Network (OSTI)

was incorporated into the planning of this activity. Additional resources on cultural and linguistic com- petency-543-6770 Anger Management for Healthcare Professionals Program The University of California, San Diego School claim credit commensurate with the extent of their participation in the activity. Cultural

Gleeson, Joseph G.

448

K-Ar Dates Of Hydrothermal Clays From Core Hole Vc-2B, Valles Caldera, New  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » K-Ar Dates Of Hydrothermal Clays From Core Hole Vc-2B, Valles Caldera, New Mexico And Their Relation To Alteration In A Large Hydrothermal System Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: K-Ar Dates Of Hydrothermal Clays From Core Hole Vc-2B, Valles Caldera, New Mexico And Their Relation To Alteration In A Large Hydrothermal System Details Activities (2) Areas (1) Regions (0) Abstract: Seventeen K/Ar dates were obtained on illitic clays within Valles caldera (1.13 Ma) to investigate the impact of hydrothermal alteration on Quaternary to Precambrian intracaldera and pre-caldera rocks in a large,

449

Environmental Assessment: Geothermal Energy Geopressure Subprogram. Gulf Coast Well Drilling and Testing Activity (Frio, Wilcox, and Tuscaloosa Formations, Texas and Louisiana)  

SciTech Connect

The Department of Energy (DOE) has initiated a program to evaluate the feasibility of developing the geothermal-geopressured energy resources of the Louisiana-Texas Gulf Coast. As part of this effort, DOE is contracting for the drilling of design wells to define the nature and extent of the geopressure resource. At each of several sites, one deep well (4000-6400 m) will be drilled and flow tested. One or more shallow wells will also be drilled to dispose of geopressured brines. Each site will require about 2 ha (5 acres) of land. Construction and initial flow testing will take approximately one year. If initial flow testing is successful, a continuous one-year duration flow test will take place at a rate of up to 6400 m{sup 3} (40,000 bbl) per day. Extensive tests will be conducted on the physical and chemical composition of the fluids, on their temperature and flow rate, on fluid disposal techniques, and on the reliability and performance of equipment. Each project will require a maximum of three years to complete drilling, testing, and site restoration.

None

1981-09-01T23:59:59.000Z

450

Property:File/CreationDate | Open Energy Information  

Open Energy Info (EERE)

CreationDate CreationDate Jump to: navigation, search Property Name File/CreationDate Property Type Date Description Original creation date for the file. Note that this is usually not the same as the date when the file was first uploaded to OpenEI. Pages using the property "File/CreationDate" Showing 25 pages using this property. (previous 25) (next 25) B BOEMRE OCS.oil.gas.2007-12.map.pdf + 12 September 2008 + BOEMRE atlantic.OCS.multiple.use.map.2003.pdf + October 2003 + BOEMRE lease.platforms.santa.barb.map.5.2010.pdf + 18 May 2010 + BOEMRE oil.gas.plant.platform.sta.brbra.map.4.2010.pdf + April 2010 + BOEMRE platforms.leases.longbeach.map.5.2010.pdf + May 2010 + Banglmetst 221.pdf + 29 December 2004 + Black.Warrior.Basin usgs.map.pdf + 2007 + BrazilTMYst 238.pdf + 1 February 2005 +

451

Property:Incentive/StartDateString | Open Energy Information  

Open Energy Info (EERE)

StartDateString StartDateString Jump to: navigation, search Property Name Incentive/StartDateString Property Type String Description Start Date string property. Use this property in queries until the Property:Incentive/StartDate property is populated with valid dates only. Currently, some are populated with additional notes included. Pages using the property "Incentive/StartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) + 01/01/2009 + A AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) + 3/11/2011 + AEP Appalachian Power - Residential Home Retrofit Program (West Virginia) + 3/11/2011 + AEP Ohio - Commercial Self Direct Rebate Program (Ohio) + 1/1/2008 +

452

Material Testing of Coated Alloys in a Syngas Combustion Environment Year 6 - Activity 1.13 - Development of a National Center for Hydrogen Technology  

SciTech Connect

Modifications were made to the inlet of the existing Energy & Environmental Research Center (EERC) thermal oxidizer to accommodate side-by-side coupon holders for exposure testing. Two 5-day tests with over 200 hours of total exposure time were completed. The first week of testing was conducted in enriched air-blown mode, with coupon temperatures ranging from 128 to 272F. Carbonyl sampling was conducted, but it was discovered after the fact that the methodology used was producing very low recoveries of iron and nickel carbonyl. Therefore, the data generated during this week of testing were not considered accurate. The second week of testing was conducted in oxygen-blown mode, with coupon temperatures ranging from 220 to 265F. Two improved methods were used to measure carbonyl concentration during this week of testing. These methods produced results closer to equilibrium calculations. Since both weeks of testing mostly produced a product gas with approximately 15%18% carbon monoxide, it was felt that actual carbonyl concentrations for Week 1 should be very similar to those measured during Week 2. The revised carbonyl sampling methodology used during the second week of testing greatly improved the recovery of iron and nickel carbonyl in the sample. Even though the sampling results obtained from the first week were inaccurate, the results from the second week can be used as an estimate for the periods during which the gasifier was operating under similar conditions and producing similar product gas compositions. Specifically, Test Periods 2 and 3 from the first week were similar to the conditions run during the second week. For a product gas containing roughly 15%18% CO and a coupon temperature of approximately 220270F, the nickel carbonyl concentration should be about 0.050.1 ppm and the iron carbonyl concentration should be about 0.10.4 ppm. After each week of testing the coupons were recovered from the coupon holder, weighed, and shipped back to Siemens for analysis.

Swanson, Michael

2011-09-01T23:59:59.000Z

453

Injectivity Test At Steamboat Springs Area (Combs, Et Al., 1999) | Open  

Open Energy Info (EERE)

Steamboat Springs Area (Combs, Et Steamboat Springs Area (Combs, Et Al., 1999) Exploration Activity Details Location Steamboat Springs Area Exploration Technique Injectivity Test Activity Date Usefulness not indicated DOE-funding Unknown Notes Part of the injection testing used downhole packers for isolating various zones and evaluating their permeability. By running the packers into the hole on N-rod ( 2.75"+K610 OD), the annulus was roughly the same cross-sectional area as the inside of the pipe. It was then possible to inject into either the zone above the packer or the one below, and compare the infectivity of those intervals. References Jim Combs, John T. Finger, Colin Goranson, Charles E. Hockox Jr., Ronald D. Jacobsen, Gene Polik (1999) Slimhole Handbook- Procedures And Recommendations For Slimhole Drilling And Testing In Geothermal Exploration

454

Interim Letter Report - Verification Survey Results for Activities Performed in March 2009 for the Vitrification Test Facility Warehouse at the West Valley Demonstration Project, Ashford, New York  

SciTech Connect

The objective of the verification activities was to provide independent radiological surveys and data for use by the Department of Energy (DOE) to ensure that the building satisfies the requirements for release without radiological controls.

B.D. Estes

2009-04-24T23:59:59.000Z

455

Geothermometry At Nevada Test And Training Range Area (Sabin, Et Al., 2004)  

Open Energy Info (EERE)

2004) 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location Nevada Test And Training Range Area Exploration Technique Geothermometry Activity Date Usefulness not indicated DOE-funding Unknown Notes Groundwater data are limited to a portion of NAFR; data are more plentiful beyond the range boundaries. Geothermometry yields calculated groundwater temperatures generally ranging from 30 to 105degrees C, with a rough correlation between the SiO2-chalcedony and the Na-K-Na (Mg-corrected) geothermometers. References A. E. Sabin, J. D. Walker, J. Unruh, F. C. Monastero (2004) Toward The Development Of Occurrence Models For Geothermal Resources In The

456

Tracer Testing At Coso Geothermal Area (2004) | Open Energy Information  

Open Energy Info (EERE)

Coso Geothermal Area (2004) Coso Geothermal Area (2004) Exploration Activity Details Location Coso Geothermal Area Exploration Technique Tracer Testing Activity Date 2004 Usefulness not indicated DOE-funding Unknown Exploration Basis To determine the EGS potential of the Coso Geothermal Field Notes A dramatic decrease in the ratio of chloride to boron was observed in the liquid discharge of a well proposed for EGS development. The decrease appears to be related to the transformation of some feed zones in the well from liquid-dominated to vapor-dominated. High concentrations of boron are transported to the wellbore in the steam, where it fractionates to the liquid phase flowing in from liquid-dominated feed zones. The high-boron steam is created when the reservoir liquid in some of the feed zones boils

457

Commitcoin: Carbon dating commitments with bitcoin  

E-Print Network (OSTI)

Abstract. In the standard definition of a commitment scheme, the sender commits to a message and immediately sends the commitment to the recipient interested in it. However the sender may not always know at the time of commitment who will become interested in verifying it. Further, when the interested party does emerge, it could be critical to establish when the commitment was made. Employing a proof of work protocol at commitment time will later allow anyone to carbon date when the commitment was made, approximately, without trusting any external parties. We present CommitCoin, an instantiation of this approach that harnesses the existing processing power of the Bitcoin peer-to-peer network; a network used to mint and trade digital cash. 1 Introductory Remarks Consider the scenario where Alice makes an important discovery. It is important to her that she receives recognition for her breakthrough, however she would also like to keep it a secret until she can establish a suitable infrastructure for monetizing it. By forgoing publication of her discovery, she risks Bob independently making the same discovery and publicizing it as his own. Folklore suggests that Alice might mail herself a copy of her discovery and leave the letter sealed, with the postal services timestamp intact, for a later resolution time. If Bob later claims the same discovery, the

Jeremy Clark; Er Essex

458

Property:OpenEI/CETSI/PublicationDate | Open Energy Information  

Open Energy Info (EERE)

OpenEI/CETSI/PublicationDate OpenEI/CETSI/PublicationDate Jump to: navigation, search Property Name OpenEI/CETSI/PublicationDate Property Type Date Description The date the resource was first published. Pages using the property "OpenEI/CETSI/PublicationDate" Showing 25 pages using this property. (previous 25) (next 25) A A Guide to Community Solar: Utility, Private, and Non-profit Project Development + 1 November 2010 + An Overview of Existing Wind Energy Ordinances + 1 December 2008 + Animal Farm Powers Village + 18 April 2011 + Assessment of the Technical Potential for Micro-Cogeneration in Small Commercial Buildings across the United States + 5 January 2008 + C City of Aspen Climate Action Plan + 1 May 2007 + Climate Action Planning: A Review of Best Practices, Key Elements, and Common Climate Strategies for Signatories to the American College & University Presidents' Climate Commitment + 5 October 2010 +

459

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

460

Testing in Software Product Lines.  

E-Print Network (OSTI)

??This thesis presents research aimed at investigating different activities involved in software product lines testing process and possible improvements towards achieving developing high quality software (more)

Odia, Osaretin

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Overview and Progress of the Battery Testing, Analysis, and Design...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Battery Testing, Analysis, and Design Activity Overview and Progress of the Battery Testing, Analysis, and Design Activity 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

462

Flow Test At Wister Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Wister Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Wister Area (DOE GTP) Exploration Activity...

463

Flow Test At Colrado Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Colrado Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Colrado Area (DOE GTP) Exploration Activity...

464

Flow Test At Alum Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Flow Test At Alum Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Flow Test At Alum Area (DOE GTP) Exploration Activity Details...

465

Property:HPBD/DateOfOccupancy | Open Energy Information  

Open Energy Info (EERE)

DateOfOccupancy DateOfOccupancy Jump to: navigation, search This is a property of type Date. Subproperties This property has the following 10 subproperties: H High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database H cont. High Performance Buildings Database High Performance Buildings Database High Performance Buildings Database Pages using the property "HPBD/DateOfOccupancy" Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + January 4 + High Performance Buildings Database + January 6 + High Performance Buildings Database + October 2 +

466

EV Project Overview Report - Project to Date through December...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2011 Charging Infrastructure Number of EV Project Number of Electricity Charging Units Charging Events Consumed Region Installed To Date Performed (AC MWh) Phoenix, AZ...

467

SAVE THE DATE - 2015 National Environmental Justice Conference...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Documents & Publications 2014 NEJC Save the Date (English) ITP Aluminum: Technical Working Group on Inert Anode Technologies Leadership Transition Program (LTP) Application Package...

468

PRINCIPAL INVESTIGATOR Last Name First Name Date Institution  

NLE Websites -- All DOE Office Websites (Extended Search)

Funding Source Research Proprietary Non-proprietary (publication in open source or peer review journal expected) Objectives: Abstract: SCHEDULING Expected start date for...

469

Test of electron beam technology on Savannah River Laboratory low-activity aqueous waste for destruction of benzene, benzene derivatives, and bacteria  

SciTech Connect

High energy radiation was studied as a means for destroying hazardous organic chemical wastes. Tests were conducted at bench scale with a {sup 60}Co source, and at full scale (387 l/min) with a 1.5 MV electron beam source. Bench scale tests for both benzene and phenol included 32 permutations of water quality factors. For some water qualities, as much as 99.99% of benzene or 90% of phenol were removed by 775 krads of {sup 60}Co irradiation. Full scale testing for destruction of benzene in a simulated waste-water mix showed loss of 97% of benzene following an 800 krad dose and 88% following a 500 krad dose. At these loss rates, approximately 5 Mrad of electron beam irradiation is required to reduce concentrations from 100 g/l to drinking water quality (5 {mu}g/l). Since many waste streams are also inhabited by bacterial populations which may affect filtering operations, the effect of irradiation on those populations was also studied. {sup 60}Co and electron beam irradiation were both lethal to the bacteria studied at irradiation levels far lower than were necessary to remove organic contaminants.

Dougal, R.A. [Univ. of South Carolina, Columbia, SC (United States). Dept. of Electrical and Computer Engineering

1993-08-01T23:59:59.000Z

470

Random Testing versus Partition Testing.  

E-Print Network (OSTI)

?? The difference between Partition Testing and Random Testing has been thoroughlyinvestigated theoretically. In this thesis we present a practical study ofthe differences between random (more)

Oftedal, Kristian

2011-01-01T23:59:59.000Z

471

TO: Procurement Directors Head of Contracting Activities FROM...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

8 DATE: December 5, 2014 TO: Procurement Directors Head of Contracting Activities FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of...

472

TO: Procurement Directors Head of Contracting Activities FROM...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 DATE: August 21, 2014 TO: Procurement Directors Head of Contracting Activities FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of...

473

Drug Testing for New Clearance Holders  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

474

Drug Testing for New Clearance Holders  

NLE Websites -- All DOE Office Websites (Extended Search)

Drug Testing Prerequisite for DOE Security Clearance Applicants Drug Testing Prerequisite for DOE Security Clearance Applicants The following matrix identifies those individuals required to have a current negative drug test as a prerequisite for being processed for a security clearance. A current test is one taken within 60 calendar days of the individual's SF-86/SF-86C signature date. For those cases where no such form is collected (e.g. reciprocity) the test must have been taken within 60 calendar days of the date of the request for security clearance. Current Status Clearance Action Test Required? Uncleared - Applicant Grant (Q/L, T/S/C) Yes Previously Cleared DOE-now uncleared DOE Reinstate (Q/L, T/S/C) Yes* Coming from another Federal agency, regardless of clearance status Grant (Q/L, T/S/C) Yes**

475

AVTA: Blink AC Level 2 Charging System Testing Results | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blink AC Level 2 Charging System Testing Results AVTA: Blink AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries...

476

AVTA: Schneider AC Level 2 Charging System Testing Results |...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schneider AC Level 2 Charging System Testing Results AVTA: Schneider AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity...

477

AVTA: SPX AC Level 2 Charging System Testing Results | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AVTA: SPX AC Level 2 Charging System Testing Results AVTA: SPX AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity...

478

AVTA: Toyota Prius Gen III HEV 2010 Testing Results | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Toyota Prius Gen III HEV 2010 Testing Results AVTA: Toyota Prius Gen III HEV 2010 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out...

479

Computer Engineering Graduate Handbook Dated: February 06, 2014  

E-Print Network (OSTI)

Computer Engineering Graduate Handbook Dated: February 06, 2014 MASTER OF SCIENCE IN COMPUTER ENGINEERING Computer Engineering Program College of Engineering & Computer Science California State University-278-5987 Fax: 657-278-5804 http://www.fullerton.edu/ecs/cpe #12;Computer Engineering Graduate Handbook Dated

de Lijser, Peter

480

Form Date 4/4/01 Refrigerant Service Order Form  

E-Print Network (OSTI)

Recovery Unit ID # : Added Lbs oz Lbs oz Lbs oz Startup Charge Net Refrigerant Added: Lbs oz Parts UsedForm Date 4/4/01 Refrigerant Service Order Form Service ID: Owner: Work Order #: Building: Date: Issued: Completed: Equipment ID: Technicians: Location: Model: Manufact: Serial #: Refrigerant Type

Russell, Lynn

Note: This page contains sample records for the topic "test activity date" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Revision Date 01.11.13 PROCUREMENT SERVICES -LOGISTICS  

E-Print Network (OSTI)

Revision Date 01.11.13 PROCUREMENT SERVICES - LOGISTICS Reading and Reconciling an ePro and MMD with your FACSID. Prerequisites: None Find Help: Email logistics_team@unc.edu #12;Procurement Services - Logistics Reading and Reconciling an ePro and MMD Statement Revision Date 01.11.13 Page 2 of 6 Departmental

Crews, Stephen

482

Dating Pleistocene Archeological Sites by Protein Diagenesis in Ostrich Eggshell  

Science Journals Connector (OSTI)

...loss than bone but were still depleted by 60% when the epimerization...I ratios and radiocarbon or uranium-series dates from each site...and A. J. T. Tull; and uranium-series dates were provided...Institute, National Institutes of Health, Bethesda, MD 20892. H...

A. S. Brooks; P. E. Hare; J. E. Kokis; G. H. Miller; R. D. Ernst; F. Wendorf

1990-04-06T23:59:59.000Z

483

An early date for cattle from Namaqualand, South Africa  

E-Print Network (OSTI)

An early date for cattle from Namaqualand, South Africa: implications for the origins of herding did cattle come to South Africa? Radiocarbon dates on a newly found cow horn indicates a time, the authors favour immigrants moving along a western route through Namibia. Keywords: South Africa

484

Key Dates | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Key Dates Key Dates Albert Einstein Distinguished Educator Fellowship (AEF) Program Einstein Fellowship Home Eligibility Benefits Obligations How to Apply Key Dates Frequently Asked Questions Contact WDTS Home Key Dates Print Text Size: A A A RSS Feeds FeedbackShare Page Key Dates for the 2014-2015 Einstein Fellowship Application process. On-line Application Opens September 24, 2013 Application Deadline 5:00pm EST December 4, 2013 Application Review 7-8 weeks Notification to Semi-Finalists [Travel Arrangements made for Interviews in Washington, DC] Late January 2014 Interviews in Washington, DC February 23-25, 2014 Finalists Notifications March 2014 Congressional Fellows Placement Interviews June - July 2014 Fellows Arrive in Washington, DC August 2014 Orientation meeting for the 2014-2015 Einstein Fellows

485

ICE Cleaning Test Report.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

16 16 FIELD DEMONSTRATION OF THE ICE 250 TM CLEANING SYSTEM AT THE ROCKY MOUNTAIN OILFIELD TESTING CENTER CASPER, WYOMING August 18-19, 1999 Date Published: October 5, 1999 J.L. Johnston L.M. Jackson PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY/ROCKY MOUNTAIN OILFIELD TESTING CENTER Work Performed Under Rocky Mountain Oilfield Testing Center (RMOTC) CRADA No. 99-009 TABLE OF CONTENTS Abstract.............................................................................................................................................1 Introduction.......................................................................................................................................1 Product Description ...........................................................................................................................1

486

Specific test and evaluation plan  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

487

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy's The Department of Energy's Management of Contractor Fines, Penalties and Legal Costs DOE/IG-0825 September 2009 Department of Energy Washington, DC 20585 September 30, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Management of Contractor Fines, Penalties and Legal Costs" BACKGROUND The Department of Energy reimburses its facility contractors for millions of dollars in settlement costs and for fees paid to outside law firms for legal research, litigation and consulting activities. Because of contract reform initiatives, the Department increased contractor financial responsibility for certain legal costs. For example, fines and

488

Date centerdTimes New Roman  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fire Protection Deficiencies at Los Fire Protection Deficiencies at Los Alamos National Laboratory DOE/IG-0816 June 2009 Department of Energy Washington, DC 20585 June 23, 2009 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Fire Protection Deficiencies at Los Alamos National Laboratory" BACKGROUND The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design

489

Advanced Technology Vehicle Testing  

SciTech Connect

The goal of the U.S. Department of Energy's Advanced Vehicle Testing Activity (AVTA) is to increase the body of knowledge as well as the awareness and acceptance of electric drive and other advanced technology vehicles (ATV). The AVTA accomplishes this goal by testing ATVs on test tracks and dynamometers (Baseline Performance testing), as well as in real-world applications (Fleet and Accelerated Reliability testing and public demonstrations). This enables the AVTA to provide Federal and private fleet managers, as well as other potential ATV users, with accurate and unbiased information on vehicle performance and infrastructure needs so they can make informed decisions about acquiring and operating ATVs. The ATVs currently in testing include vehicles that burn gaseous hydrogen (H2) fuel and hydrogen/CNG (H/CNG) blended fuels in internal combustion engines (ICE), and hybrid electric (HEV), urban electric, and neighborhood electric vehicles. The AVTA is part of DOE's FreedomCAR and Vehicle Technologies Program.

James Francfort

2004-06-01T23:59:59.000Z

490

Date | 1Refrigeration and Air Conditioning EMA Education and Training Date | 2Refrigeration and Air Conditioning EMA Education and Training  

E-Print Network (OSTI)

Date | 1Refrigeration and Air Conditioning EMA Education and Training #12;Date | 2Refrigeration operating pressure (MOP) 5. De-humidifying (Te control) 6. Defrost funtions 7. Loss of charge detection (LOC control) 6. Defrost funtions 7. Loss of charge detection (LOC) 8. Bleed function 9. Sensor placement tips

Oak Ridge National Laboratory

491

Testing operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) |  

Open Energy Info (EERE)

operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Testing operations plan: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) Details Activities (1) Areas (1) Regions (0) Abstract: Coso Geothermal Exploratory Hole No. 1 (CGEH-1) was drilled to investigate the potential of the Coso Hot Springs Known Geothermal Resource Area (KGRA) in southeastern California. Detailed background information is contained in the drilling plan, Coso Geothermal Exploratory Hole No. 1 (CGEH-1), NVO-184, dated June 1977. The purpose of this supplement to NVO-184 is to establish a plan of operations for testing the resource after completion of well drilling activities. Major elements of this plan include

492

Mobile Testing  

Science Journals Connector (OSTI)

Mobile apps are everywhere. Some apps entertain and others enable business transactions. Apps increasingly interact with complex IT landscapes. For example, a banking app on a mobile device acts as a front end that invokes services on a back-end server ... Keywords: mobile apps, mobile devices, software quality management, software testing, test automation, test strategy

Klaus Haller

2013-11-01T23:59:59.000Z

493

Coal Ash Corrosion Resistant Materials Testing  

SciTech Connect

In April 1999, three identical superheater test sections were installed into the Niles Unit No.1 for the purpose of testing and ranking the coal ash corrosion resistance of candidate superheater alloys. The Niles boiler burns high sulfur coal (3% to 3.5%) that has a reasonably high alkali content, thus the constituents necessary for coal ash corrosion are present in the ash. The test sections were controlled to operate with an average surface metal temperature from approximately 1060 F to 1210 F which was well within the temperature range over which coal ash corrosion occurs. Thus, this combination of aggressive environment and high temperature was appropriate for testing the performance of candidate corrosion-resistant tube materials. Analyses of the deposit and scale confirmed that the aggressive alkali-iron-trisulfate constituent was present at the metal surface and active in tube metal wastage. The test sections were constructed so that the response of twelve different candidate tube and/or coating materials could be studied. The plan was to remove and evaluate one of the three test sections at time intervals of 1 year, 3 years, and 5 years. This would permit an assessment of performance of the candidate materials as a function of time. This report provides the results of the evaluation of Test Section C, including the samples that remained in the Test Section for the full exposure period as well as those that were removed early. The analysis of Test Section C followed much the same protocol that was employed in the assessment of Test Section A. Again, the focus was on determining and documenting the relative corrosion rates of the candidate materials. The detailed results of the investigation are included in this report as a series of twelve appendices. Each appendix is devoted to the performance of one of the candidate alloys. The table below summarizes metal loss rate for the worst case sample of each of the candidate materials for both Test Sections A and C. The body of this report compares these for all of the samples in the test section. The 'Coal Ash Corrosion Resistant Materials Testing Program' is being conducted by The Babcock & Wilcox Company (B&W), the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) at Reliant Energy's Niles plant in Niles, Ohio to provide full-scale, in-situ testing of recently developed boiler superheater materials. Fireside corrosion is a key issue for improving efficiency of new coal fired power plants and improving service life in existing plants. In November 1998, B&W began development of a system to permit testing of advanced tube materials at metal temperatures typical of advanced supercritical steam temperatures (1100 F and higher) in a boiler exhibiting coal ash corrosive conditions. Several materials producers including Oak Ridge National Laboratory (ORNL) contributed advanced materials to the project. In the spring of 1999 a system consisting of three identical sections, each containing multiple segments of twelve different materials, was installed. The sections are cooled by reheat steam, and are located just above the furnace entrance in Niles Unit No.1, a 110 MWe unit firing high sulfur Ohio coal. In November 2001 the first section was removed for thorough metallurgical evaluation after 29 months of operation. The second section was removed in August of 2003. Its evaluation has been completed and is the subject of this report. The final section remains in service and is expected to be removed in the spring of 2005. This paper describes the program; its importance, the design, fabrication, installation and operation of the test system, materials utilized, and experience to date. This report briefly reviews the results of the evaluation of the first section and then presents the results of the evaluation of the second section.

D. K. McDonald; P. L. Daniel; D. J. DeVault

2003-08-31T23:59:59.000Z

494

Stress Test | Open Energy Information  

Open Energy Info (EERE)

Stress Test Stress Test Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Stress Test Details Activities (1) Areas (1) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Downhole Techniques Exploration Sub Group: Well Testing Techniques Parent Exploration Technique: Well Testing Techniques Information Provided by Technique Lithology: Stratigraphic/Structural: Fracture distribution and ambient tectonic stresses Hydrological: Fluid flow direction Thermal: Dictionary.png Stress Test: A geologic stress analysis based on images of a borehole wall and hydraulic fracturing tests to characterize fracture orientations and stress magnitudes in order to identify stress planes and zones of potential permeability. Other definitions:Wikipedia Reegle

495

Injectivity Test | Open Energy Information  

Open Energy Info (EERE)

Injectivity Test Injectivity Test Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Injectivity Test Details Activities (7) Areas (6) Regions (0) NEPA(1) Exploration Technique Information Exploration Group: Downhole Techniques Exploration Sub Group: Well Testing Techniques Parent Exploration Technique: Well Testing Techniques Information Provided by Technique Lithology: Stratigraphic/Structural: Hydrological: Permeability of the well Thermal: Dictionary.png Injectivity Test: A well testing technique conducted upon completion of a well. Water is pumped into the well at a constant rate until a stable pressure is reached then the pump is turned off and the rate at which pressure decreases is measured. The pressure measurements are graphed and well permeability can

496

DOE and AID stand-alone photovoltaic activities. Status report  

SciTech Connect

The NASA Lewis Research Center (LeRC) is managing stand-alone photovoltaic (PV) system activities sponsored by the US Department of Energy (DOE) and the US Agency for International Development (AID). The DOE project includes village PV power demonstration projects in Gabon (four sites) and the Marshall Islands, PV-powered medical refrigerators in six countries, PV system microprocessor control development activities and PV-hybrid system assessments. The AID project includes a large village systen in Tunisia, a water pumping/grain grinding project in Upper Volta, five medical clinics in four countries, PV-powered medical refrigerator field tests in eighteen countries and one PV-powered remote earth station application. This paper reviews these PV activities and summarizes significant findings to date.

Bifano, W.J.; Ratacajczak, A.F.

1983-01-01T23:59:59.000Z

497

I HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S)  

Office of Legacy Management (LM)

HEHORANDIJH HEHORANDIJH I TO{ FILE DATE SUti.lECTa I O&R(S) -------- lyaa * ------------------------ currwlt * ~e.Gd. ------------------------ Owner contacted Ja Yes 0 no; if ym, date contact=d--~~~?~~-2--- :TY+E OF OPERATION --------- - ---- Research & Development 0 Facility Type Production scale testing Pi lot Scale Bench Scale Process Theoretical Studies *i Sample & &balysis a Hanuf ??cturing a University 0 Research Organization 0 Sov~rnment Sponsored Facjlity a Other --------------------- I *l IPr~oduction Q Di8poklKtorage ?? rrimo cl Other information (i.e., cost 0 +bcontractor + fixed fem. unit price, ?? Purchase Order time 81 material, ?? tc) , ---------------------------- kontract,Purchame Order # kJ -?!a se -fiti & ~~~-~~~~~~~~~~--=~~-=------~ ----------w--mm -- E!!me~IEJ!L~E~~~~:

498

America's Wind Testing Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Testing Facilities Wind Testing Facilities America's Wind Testing Facilities Addthis National Wind Technology Center - Colorado 1 of 7 National Wind Technology Center - Colorado The first of 4 towers is lifted as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-15 13:53 National Wind Technology Center - Colorado 2 of 7 National Wind Technology Center - Colorado Workers use a giant crane for lifting the blade assembly as work continues on the 2 MW Gamesa wind turbine being installed at NREL's National Wind Technology Center (NWTC). | Photo by Dennis Schroeder. Date taken: 2011-09-22 12:06 Wind Technology Testing Center - Boston 3 of 7 Wind Technology Testing Center - Boston

499

Performance evaluation of granular activated carbon system at Pantex: Rapid small-scale column tests to simulate removal of high explosives from contaminated groundwater  

SciTech Connect

A granular activated carbon (GAC) system is now in operation at Pantex to treat groundwater from the perched aquifer that is contaminated with high explosives. The main chemicals of concern are RDX and HMX. The system consists of two GAC columns in series. Each column is charged with 10,000 pounds of Northwestern LB-830 GAC. At the design flow rate of 325 gpm, the hydraulic loading is 6.47 gpm/ft{sup 2}, and the empty bed contact time is 8.2 minutes per column. Currently, the system is operating at less than 10% of its design flow rate, although flow rate increases are expected in the relatively near future. This study had several objectives: Estimate the service life of the GAC now in use at Pantex; Screen several GACs to provide a recommendation on the best GAC for use at Pantex when the current GAC is exhausted and is replaced; Determine the extent to which natural organic matter in the Pantex groundwater fouls GAC adsorption sites, thereby decreasing the adsorption capacity for high explosives; and Determine if computer simulation models could match the experimental results, thereby providing another tool to follow system performance.

Henke, J.L.; Speitel, G.E. [Univ. of Texas, Austin, TX (United States). Dept. of Civil Engineering] [Univ. of Texas, Austin, TX (United States). Dept. of Civil Engineering

1998-08-01T23:59:59.000Z

500

ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- February 3, 2012 ENERGY STAR® is a joint program of the U.S. Department of Energy (DOE) and the U.S. Environmental Protection Agency (EPA) with a dual focus on energy and cost savings. These goals are reached through a combination of increasing customer awareness, partnering with over 15,000 private and public sector organizations and driving widespread technological advances in energy efficiency. ENERGY STAR recognizes three paths to increased daily energy efficiency: bringing to market new energy-efficient products, constructing efficient new homes and commercial buildings, and improving the efficiency of existing homes, commercial buildings and industrial facilities. In 2010, DOE launched a pilot program to verify the energy efficiency and water-use characteristics of