National Library of Energy BETA

Sample records for tesf-csb-2 proposed action

  1. Description of Proposed Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical

  2. Environmental Assessment - Proposed Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for

  3. Implementation Proposal for the National Action Plan on Demand...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Implementation Proposal for the National Action Plan on DemandResponse - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to ...

  4. N Springs expedited response action proposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

  5. Implementation Proposal for the National Action Plan on Demand Response -

    Office of Environmental Management (EM)

    July 2011 | Department of Energy Implementation Proposal for the National Action Plan on Demand Response - July 2011 Implementation Proposal for the National Action Plan on Demand Response - July 2011 Report to Congress prepared by the staff of the Federal Energy Regulatory Commission (FERC) and the Department of Energy. PDF icon Implementation Proposal for the National Action Plan on Demand Response - July 2011 More Documents & Publications National Action Plan on Demand Response, June

  6. ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE

    Office of Legacy Management (LM)

    ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . .

  7. EA-2005: Notice of Proposed Floodplain Action | Department of Energy

    Energy Savers [EERE]

    Notice of Proposed Floodplain Action EA-2005: Notice of Proposed Floodplain Action Chromium Plume Control Interim Measure and Plume-Center Characterization, Los Alamos National Laboratory, Los Alamos, NM The Department of Energy Environmental Management Los Alamos Field Office has prepared a Draft Environmental Assessment for the Chromium Plume Control Interim Measure and Plume-Center Characterization at the Los Alamos National Laboratory (LANL). This provides notice of proposed floodplain

  8. The NEPA threshold question revisited: Proposed'' actions and continuing'' activities

    SciTech Connect (OSTI)

    Wolff, T.A. ); Hansen, R.P. )

    1993-01-01

    The National Environmental Policy Act (NEPA) requires Federal agencies to include a detailed statement'' in every recommendation or report on proposals'' for major Federal actions significantly affecting the quality of the human environment.'' Unless the three elements of a proposal are present (major, federal, and action), preparation of a detailed statement is not required. This paper addresses the practical decision-making dilemma that attends determinations of what types of Federal activities meet the NEPA threshold test under what kinds of varying circumstances. The authors' experience with the US Dept. of Energy (DOE) NEPA documentation is used to discuss how decisions may be made to determine whether a proposed action qualifies for a categorical exclusion'' or whether it requires preparation of an environmental assessment (EA) or an environmental impact statement (EIS). The concept of new'' actions versus continuing'' actions which may be bounded'' by previous NEPA documentation is also discussed. A dichotomous key for separating or combining Federal action'' candidates for different levels of NEPA documentation is provided. Leading court opinions on the threshold question and related issues are discussed in lay terms.

  9. DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EA for Conveyance of Land at the Hanford Site, Richland, WA Page 1 of 6 September 2015 DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE, RICHLAND, WASHINGTON AGENCY: U.S. Department of Energy Richland Operations Office ACTION: Mitigation Action Plan SUMMARY: This Mitigation Action Plan (MAP) is an integral part of the Finding of No Significant Impact (FONSI) for the United States Department of Energy's (DOE) Environmental Assessment for Proposed Conveyance of

  10. DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE,

    Office of Environmental Management (EM)

    EA for Conveyance of Land at the Hanford Site, Richland, WA Page 1 of 6 September 2015 DOE/EA-1915 MITIGATION ACTION PLAN PROPOSED CONVEYANCE OF LAND AT THE HANFORD SITE, RICHLAND, WASHINGTON AGENCY: U.S. Department of Energy Richland Operations Office ACTION: Mitigation Action Plan SUMMARY: This Mitigation Action Plan (MAP) is an integral part of the Finding of No Significant Impact (FONSI) for the United States Department of Energy's (DOE) Environmental Assessment for Proposed Conveyance of

  11. CEQ Guidance on the Application of NEPA to Proposed Federal Actions in the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    United States with Transboundary Effects | Department of Energy Guidance on the Application of NEPA to Proposed Federal Actions in the United States with Transboundary Effects CEQ Guidance on the Application of NEPA to Proposed Federal Actions in the United States with Transboundary Effects CEQ Guidance on the Application of NEPA to Proposed Federal Actions in the United States with Transboundary Effects The purpose of this guidance is to clarify the applicability of the National

  12. Title 40 CFR 1502.14 Alternatives Including the Proposed Action...

    Open Energy Info (EERE)

    .14 Alternatives Including the Proposed Action Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 40 CFR...

  13. Chromium Project Notice of Proposed Floodplain Action Public Comment Period Closes November 20th,

    Office of Environmental Management (EM)

    Chromium Project Notice of Proposed Floodplain Action Public Comment Period Closes November 20th, 2015 The Department of Energy Environmental Management Los Alamos Field Office has prepared a Draft Environmental Assessment for the Chromium Plume Control Interim Measure and Plume-Center Characterization at the Los Alamos National Laboratory (LANL). The proposed action may include well pad and access road installation and maintenance, piezometer placement, and pipeline placement in the 100-year

  14. Action

    National Nuclear Security Administration (NNSA)

    Register / Vol. 72, No. 39 1 Wednesday, February 28, 2007 /Notices 9037 - has requested this exemption in order to revise the October 1988 exemption to include additional combustibles such as the 480V Reactor Building Vent Boards lB, 2B, and 3B; small panels in Units 1, 2 and 3; and the one hour fire rated fire wrap (Thermo-lag) material for the 20- foot separation zones identified. Environmental Impacts of the Proposed Action The proposed action will not significantly increase the probability

  15. Proposed Action Title: U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Storm Shelter Construction Project Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Gore/Muskogee/Oklahoma; Jonesboro/Craighead/ Arkansas SWPAF 450.4 (Rev. 05/14) Proposed Action Description: Southwestern Power Administration proposes to construct aboveground storm shelters at at the Gore and Jonesboro Maintenance Facilities. Categorical Exclusion(s) Applied: 10 CFR 1021, Appendix 8 to Subpart D, Part 82.3. Installation of, or improvements to, equipment

  16. Proposed Action Title: U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 Program or Field Office: Southwestern Power Administration Location(s) (City/County/State): Springfield, Christian County, Missouri SWPA F450.4 (Rev. 2/16) Proposed Action Description: Southwestern Power Administration proposes to modify and relocate a small seqment of transmission line to accommodate and provide safety clearance for a retail development project in an urbanized section of Springfield, Missouri.

  17. Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Standards Program The FY 2003 Priority- Setting Summary Report and Actions Proposed Date: August 22, 2002 Table of Contents i EXECUTIVE SUMMARY.............................................................................................. iv 1 Energy Conservation Program - Product Prioritization Process.......1-1 1.1 Background on Appliance Standards Program........................................... 1-1 1.2 DOE Authority to Add Products

  18. Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments - Chapter 2 Proposed Action and Alternatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-1 CHAPTER 2 PROPOSED ACTION AND ALTERNATIVES Some types of experiments are best (or only) performed deep underground. For this reason, scientists have considered WIPP as a potential site for these types of experiments and have sought permission from DOE to conduct several types of experiments there. As an example, astrophysicists are searching for very small particles with no charge called neutrinos. These particles are so small that they typically pass through the Earth. The only way to

  19. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  20. DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

  1. Finding of no significant impact proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida

    SciTech Connect (OSTI)

    1995-06-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) (DOE/EA-0976) of the proposed corrective action for the Northeast Site at the Pinellas Plant in Largo, Florida. The Northeast Site contains contaminated groundwater that would be removed, treated, and discharged to the Pinellas County Sewer System. Based on the analyses in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C.4321 et.seq. Therefore, the preparation of an environmental impact statement is not required and the DOE is issuing this Finding of No Significant Impact (FONSI).

  2. Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer Involvement Reports & Tools...

  3. Proposed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposed Settlement for Hanford Cleanup U.S. Department of Energy ● Washington State Department of Ecology * U.S. Environmental Protection Agency What's this proposed settlement about? Public Comment The Tri-Party Agreement agencies want your feedback. The public comment period is from October 1 through December 11, 2009. These new commitments would address important activities that are needed to protect human health and the environment. The settlement will impose a new, enforceable and

  4. Review and analysis of proposed EPA groundwater standards for the UMTRA Project. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all sites. On September 24, 1987, the EPA published proposed standards in response to the remand. This Summary Report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project as well as a discussion of the DOE's position on the proposed standards. This report is accompanied by a detailed Technical Report and Appendices which provide supporting information and analyses. This Summary Report results from a study undertaken to: determine the impact of the proposed standards on the UMTRA Project; and recommend provisions for the implementation of the final standards that will minimize adverse impact to the conduct of the UMTRA Project while ensuring protection of human health and the environment. Specifically, the following were considered: the flexibility of the proposed standards; interpretations of the proposed standards; the extent of aquifer restoration that may be required to implement the proposed standards at each site; the costs of aquifer restoration; and design changes necessary to meet the standards.

  5. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    SciTech Connect (OSTI)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.

  6. Categorical Exclusion Determination Form Proposed Action Title...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    modeling, and analysis of actual system flow information in a simulated environment. Project work will take place at Smart Wire Grid, Inc. (Oakland, CA), Innoventor, Inc. (Earth ...

  7. Chapter 2 - Proposed Action and Alternatives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In the past, WIPP-related actinide chemistry experiments have taken place at DOE laboratory facilities at other DOE sites such as LANL. However, due to reductions in travel...

  8. Notice_of_Proposed_Action.pdf

    Office of Legacy Management (LM)

  9. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Corrective Action Individual Permit: Corrective Action Certifications If confirmation monitoring sample results demonstrate that one or more TALs are exceeded at a Site, the permittees are required to initiate corrective action. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Corrective Action Certifications Certification of Corrective Action Complete is demonstrated by one of the following: Eliminate Exposure (11 SMAs,

  10. Proposed Tri-Party Agreement Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposed Tri-Party Agreement Modifications for Initial Single Shell Tank Waste Management Area Corrective Actions, Vadose Zone and Groundwater...

  11. Proposed Rules Federal Register

    Energy Savers [EERE]

    5383 Vol. 81, No. 21 Tuesday, February 2, 2016 DEPARTMENT OF ENERGY 10 CFR Part 900 RIN 1901-AB36 Coordination of Federal Authorizations for Electric Transmission Facilities AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of proposed rulemaking. SUMMARY: The Department of Energy (DOE) proposes to amend its regulations for the timely coordination of Federal Authorizations for proposed interstate electric transmission facilities pursuant to

  12. Action Items

    Office of Environmental Management (EM)

    ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS...

  13. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by ALS management, appropriate to the proposal. Rapid Access Proposals (RA) A proportion of beam time on some beamlines is reserved to provide rapid access for simple,...

  14. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive...

  15. United States Forest Service - Forest Service Schedule of Proposed...

    Open Energy Info (EERE)

    Actions Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: United States Forest Service - Forest Service Schedule of Proposed Actions Abstract The...

  16. RAPIDD Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RAPIDD Proposals Print The combined process for Rapid Access Proposals, Industry, and Director's Discretion (RAPIDD) beam time accommodates users who require limited or rapid access to ALS beam time. There are a number of proposal types that are available on a variety of beamlines, as described below. Log in to ALSHub to submit a RAPIDD proposal. The RAPIDD process is not suitable for users requiring significant beam time for an extended program of research or those wanting to perform complex

  17. Corrective Action

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Corrective Action Complete is demonstrated by one of the following: Eliminate Exposure (11 SMAs, 16 Sites) SMA SITE Submittal Date Document 2M-SMA-2.2 03-003(k) September...

  18. EIS-0389: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

  19. ADDENDUM TO ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE...

    Office of Legacy Management (LM)

    ACTION DESCRIPTION MEMORANDUM NIAGARA FALLS STORAGE SITE PROPOSED INTERIM REMEDIAL ACTIONS ... July 1984 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services ...

  20. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  1. Proposal Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Process Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds 100G SDN Testbed Testbed Description Proposal Process Terms and Conditions Dark Fiber Testbed Test Circuit Service Testbed Results Current Testbed Research Previous Testbed Research Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600

  2. Proposed Rules

    National Nuclear Security Administration (NNSA)

    4414 Federal Register / Vol. 78, No. 209 / Tuesday, October 29, 2013 / Proposed Rules NRC about the availability of information for the proposed Waste Confidence rule and DGEIS. You may access publicly available information related to these documents by any of the following methods: * Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0246. * NRC's Waste Confidence Web site: Go to http://www.nrc.gov/waste/spent- fuel-storage/wcd.html. * NRC's

  3. Unsolicited Proposals

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-02-27

    The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their Supersedes DOE O 542.2. Certified 12-28-06.

  4. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and ...

  5. Defining the no action alternative for NEPA document of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1995-12-01

    Environmental professionals today must address many issues that might not have been foreseen by developers of the National Environmental Policy Act of 1969 (NEPA) or the President`s Council on Environmental Quality (CEQ) regulations for implementing NEPA. One issue is the definition of the no action alternative for NEPA documentation of continuing actions. The CEQ regulations do not define the no action alternative, but merely state that NEPA analyses shall {open_quotes}include the alternative of no action{close_quotes}. For NEPA analyses of newly proposed actions, the practical definition of the no action alternative is clear (i.e., the agency will not implement the proposed action or alternative actions). However, the practical definition for NEPA analyses of continuing actions is not so clear. To clarify the definition of the no action alternative for continuing actions, particularly those that involve agency decisions about relicensing existing projects or continuing to operate existing programs or facilities. In trying to clarify the definition of the no action alternative for continuing actions, this paper examines the function of the no action alternative for NEPA analyses in general. Pertinent issues include how the definition of the no action alternative affects the selection of the baseline for environmental analysis and whether inclusion of the no action alternative really forces agencies to consider no action as a realistic alternative. To address these issues, this paper begins with a discussion of relevant legal decisions involving the no action alternative in NEPA analyses. The paper then examines some agency NEPA regulations and recent NEPA documents to provide examples of how some agencies address the no action alternative for continuing actions. Finally, the paper suggests definitions of the no action alternative for continuing actions and methods for addressing no action as a realistic alternative.

  6. A Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Proposal for a New Experiment Using the Booster and NuMI Neutrino Beamlines: MicroBooNE October 15, 2007 H. Chen, J. Farrell, F. Lanni, D. Lissauer, D. Makowiecki, J. Mead, V. Radeka, S. Rescia, J. Sondericker, B. Yu Brookhaven National Laboratory, Upton, NY L. Bugel, J. M. Conrad, V. Nguyen, M. Shaevitz, W. Willis ‡ Columbia University, New York, NY C. James, S. Pordes, G. Rameika Fermi National Accelerator Laboratory, Batavia, IL C. Bromberg, D. Edmunds Michigan State University, Lansing,

  7. RCRA corrective action determination of no further action

    SciTech Connect (OSTI)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, `Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities`, would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action.

  8. Discovery in Action - Pacific Northwest National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Discovery in Action Discovery in Action

  9. Defining the no-action alternative for National Environmental Policy Act analyses of continuing actions

    SciTech Connect (OSTI)

    McCold, L.N.; Saulsbury, J.W.

    1998-01-01

    The Council on Environmental Quality (CEQ) regulations for implementing the National Environmental Policy Act of 1969 (NEPA) do not define the no-action alternative, stating only that EPA analyses shall include the alternative of no action. The definition of the no-action alternative for newly proposed actions seems clear. However, for continuing actions, the meaning of the no-action alternative is ambiguous. This article examines the overall function of the no-action alternative for NEPA analyses of continuing actions. It begins with a discussion of the conflicting definitions of the no-action alternative for continuing activities, including CEQ regulations and guidelines related to the no-action alternative and legal decisions that have helped establish precedence for defining no action. A review of NEPA regulations and guidelines of 10 federal agencies shows how different agencies define no-action for continuing actions. Review of six recent NEPA documents on continuing actions reveals how their definition of the no-action alternative promote or impede informed decision-making.

  10. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised 11-2009 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the

  11. 30-Day Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy. ACTION: Notice and Request for OMB Review and Comment SUMMARY: The Department of Energy (DOE) has submitted to the Office of Management and Budget (OMB) for clearance, a proposal for collection of information under the provisions of the Paperwork Reduction Act of 1995. The proposed collection will {enter a brief description of the collection that

  12. 60-DAY Federal Register Notice - Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY: U.S. Department of Energy ACTION: Notice and Request for Comments SUMMARY: The Department of Energy (DOE) invites public comment on a proposed collection of information that DOE is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995. Comments are invited on: (a) whether the proposed collection of information is necessary for the proper

  13. QER- Comment of Berkshire Environmental Action Team

    Broader source: Energy.gov [DOE]

    Dear members of the Quadrennial Energy Review Task Force, Please find attached comments from the Berkshire Environmental Action Team, Inc. (BEAT) regarding the proposed natural gas pipeline expansion. Thank you for considering our comments.

  14. EIS-0385: Notice of Proposed Floodplain and Wetland Actions ...

    Broader source: Energy.gov (indexed) [DOE]

    Announcement The Department of Energy (DOE) is preparing an environmental impact statement (EIS) for site selection for expansion of the Strategic Petroleum Reserve, as required by...

  15. Property:NEPA Proposed Action | Open Energy Information

    Open Energy Info (EERE)

    line (Alternative D) or two parallel lines (Alternative E) running 63 miles from the Red Substation near Killdeer to the new White Substation and on to the Blue Substation and...

  16. RCRA corrective action program guide (Interim)

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  17. EIS-0384: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project designers and reviewers minimized short-term and long-term environmental and social impacts of the Proposed Action through project design, consultation with regulatory...

  18. EIS-0425: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental...

  19. EA-1934: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    impacts resulting from implementation of the proposed action. PDF icon EA-1934-FEA-MAP-2013.pdf More Documents & Publications EA-1934: 2014 Annual Report for Mitigation...

  20. Mitigation Action Plans (MAP) and Related Documents | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi March 10, 2010...

  1. Corrective Actions Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Cleanup » Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called the corrective action process. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Corrective actions The Laboratory's corrective actions process refers to the way in which the Laboratory investigates, stabilizes,

  2. DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers

    Office of Environmental Management (EM)

    (Notice of Proposed Civil Penalty and Requests for Test Data Issued) | Department of Energy Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) DOE Initiates Enforcement Actions Against 4 Showerhead Manufacturers (Notice of Proposed Civil Penalty and Requests for Test Data Issued) March 7, 2010 - 3:41pm Addthis The Office of General Counsel has issued a Notice of Proposed Civil Penalty to Hudson-Reed Limited

  3. 2014 Joint Action Workshop

    Broader source: Energy.gov [DOE]

    The Joint Action Workshop is an annual event for joint action agencies and their members to meet informally and discuss emerging policy, regulatory, and power supply issues, and other topics...

  4. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  5. Mitigation Action Plan

    Office of Environmental Management (EM)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  6. Guidance on the Consideration of Past Actions in Cumulative Effects

    Office of Environmental Management (EM)

    Analysis | Department of Energy on the Consideration of Past Actions in Cumulative Effects Analysis Guidance on the Consideration of Past Actions in Cumulative Effects Analysis In this Memorandum, the Council on Environmental Quality provides guidance on the extent to which agencies of the Federal government are required to analyze the environmental effects of past actions when they describe the cumulative environmental effect of a proposed action. PDF icon Guidance on the Consideration of

  7. EA-1212: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    12: Mitigation Action Plan EA-1212: Mitigation Action Plan Lease of Land for the Development of a Research Park at Los Alamos National Laboratory, Los Alamos, NM This Mitigation Action Plan identifies commitments made in the Finding of No Significant Impact to mitigate potential effects from constructing and operating a proposed research park on land leased from Los Alamos National Laboratory and establishes an action plan to carry out each commitment. PDF icon EA-1212-MAP-1997.pdf More

  8. Action Item Review and Status

    Office of Environmental Management (EM)

    Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project...

  9. Call for Proposal Submissions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call for Proposal Submissions The Request for Proposals for the JLF User Program for experiments in Calendar Year 2016 has closed. The Request for Proposals for experiments in Calendar Year 2017 will open in the summer of 2016

  10. Past Calls for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals Past Calls for Proposals 2015 Call for Proposals to use NERSC Resources The 2015 Call for Proposals to use NERSC Resources opens August 13, 2014, and closes September 22, 2014. Read More » 2014 Call for Proposals to use NERSC Resources The Office of Science of the U. S. Department of Energy (DOE) solicits proposals for 2014 allocations of high performance computing resources at the National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory.

  11. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are typically issued twice a year, for each run cycle of the accelerator. Deadlines will be posted. Lujan Center pRad WNR Lujan Center: Nuclear and Materials Research FY16 Call for Proposalsis closed. Proposal Submission Read the Lujan Center call for proposals. Deadline: July 24 , 2015, 5:00 p.m. (MDT) Unclassified Proposal

  12. 2015 Electricity Form Proposals

    U.S. Energy Information Administration (EIA) Indexed Site

    Proposed Changes to Electricity and Renewable (Photovoltaic) Survey Forms November 19, 2015 In early 2016 the U.S. Energy Information Administration (EIA) will formally propose ...

  13. Trident Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call for Proposals Trident Call for Proposals Enabling world-class science in high-energy density physics and fundamental laser-matter interactions Contact Operations Team...

  14. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP AIB Report » Status of Corrective Actions Status of Corrective Actions at LANL Department of Energy Issues Accident Investigation Board (AIB) Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions Undertaken by Los Alamos National Laboratory though a collaborative effort led by the Associate Director for Environmental Safety and Health (ADESH), the Associate Director for

  15. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  16. Protective Actions and Reentry

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines appropriate protective actions and reentry of a site following an emergency. Canceled by DOE G 151.1-4.

  17. ARM - Status and Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status and Actions Campaign Details News Field Participants Resources Status and Actions ARM Data Discovery Browse Data Status and Actions For up-to-date campaign action, please see News 28.JUN.07 Requests for all field participants: Please place your preliminary data on the CHAPS ftp site no later than December. Connor Flynn has worked with ARM colleagues to give us a password protected FTP site. If you haven't received the instructions already from Connor regarding how to access the site,

  18. Notes and Action Items

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rick Kendall, Tom Kitchens, Horst Simon SubCommittee on Visualization and Graphics Software Responsibility: JN Leboeuf, Judy Giarrusso, Steve Jardin, and Steve Lau Actions:...

  19. Portsmouth Remedial Actions Documents

    Broader source: Energy.gov [DOE]

    Remedial Action documents for the Portsmouth Site Process Buildings and Complex Facilities Decontamination and Decommissioning Decision Portsmouth Site Site-Wide Waste Disposition Decision

  20. Trident Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trident Call for Proposals Trident Call for Proposals Enabling world-class science in high-energy density physics and fundamental laser-matter interactions Contact Operations Team Leader Randy Johnson (505) 665-5089 Email Trident Governing Board Contact Ray Leeper (505) 667-3653 Email Call for Proposals 2015-2016 The Trident Laser Facility is accepting proposals for experiments to be performed at the facility during the period October 2015 through September 2016. All proposals submitted are

  1. PROPOSAL PREPARATION INSTRUCTIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-08RV14800 Modification No. A015 PROPOSAL PREPARATION INSTRUCTIONS 1. INTRODUCTION This document contains instructions to the contractor for the preparation of a proposal in response to the modification of the contract which defines work that will be funded by and performed under the provisions of the American Recovery and Reinvestment Act (Recovery Act). The contractor shall provide a written proposal consisting of a Technical Proposal and a Cost and Fee Proposal. The

  2. OFFEROR'S PROPOSAL LETTER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RFP OPL (Rev. 4, 8/4/15) RFP Offeror's Proposal Letter Initials: Page 1 of 4 OFFEROR'S PROPOSAL LETTER In response to the Solicitation, also known as request for proposal (RFP), referenced below, and in accordance with the accompanying solicitation provisions, any addenda thereto and the terms and conditions of the proposed subcontract, the Offeror identified below (hereinafter referred to as OFFEROR) proposes to furnish all plant, labor, technical and professional services, supervision,

  3. NETL: Unsolicited Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in the link below which includes all DOE Program Research Areas. The "Guide for the Submission of Unsolicited Proposals" provides more information on the unsolicited proposal process. DOE encourages organizations and individuals to submit self-generated, unsolicited proposals that are relevant to DOE's research

  4. WREP Mitigation Action Plan

    Broader source: Energy.gov (indexed) [DOE]

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  5. Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals | FY2016 pRad: Call for Proposals Proposal Submission Deadline: 5:00 pm (MST) Wednesday, March 16, 2016. PAC Review: week of April 4th, 2016. Call for Proposals: Proton Radiography FY17 The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for experiments for the Proton Radiography Facility (pRad) during Fiscal Year 2017. Proposals for FY18 experiments that will not be ready to be performed FY17 will be considered. The proton radiography facility uses 800 MeV

  6. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals | FY2017 pRad: Call for Proposals Proposal Submission Deadline: 5:00 pm (MST) Wednesday, March 16, 2016. PAC Review: week of April 4th, 2016. Call for Proposals: Proton Radiography FY17 The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for experiments for the Proton Radiography Facility (pRad) during Fiscal Year 2017. Proposals for FY18 experiments that will not be ready to be performed FY17 will be considered. The proton radiography facility uses 800 MeV

  7. 2014 ALCC Proposals Due

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

  8. Submit CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Submit Proposals Submit CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email FY16 Deadline to submit CSES Emerging Ideas proposals: Friday, March 11, 2016 FY16 Deadline to submit CSES Student and Postdoctoral Fellow proposals: Monday, April 4, 2016 The Center for Space and Earth Science

  9. ARM - Funded Research Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Proposals Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional &...

  10. Notices ACTION: Notice.

    Office of Environmental Management (EM)

    8867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  11. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register Vol. 80, No. 215 Friday, November 6, 2015 Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas...

  12. Status of Corrective Actions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions...

  13. Full Proposal Instructions_2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Full Proposal Instructions NIF Facility Time Proposal Please prepare your full proposal according to the following instructions. Append biographical sketches(CVs) for the Principal Investigator (PI) and no more than 5 additional key team members to the end of this proposal. Submission Deadlines: Save the entire document as a single file in pdf format, and submit via the Web submission tool before 11:59 p.m. on September 1, 2015, PDT. I. COVER SHEET: (1 page) 1) Please provide the proposal title,

  14. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals dotline Lujan Center: Nuclear and Materials Research FY16 Call for Proposals Proposal Submission: https://www.lanl.gov/orgs/lansce/ Lujan Center Call for Proposals is Open. Deadline: July 24, 2015 at 5:00 pm (MDT). lansce.lanl.gov lansce.lanl.gov/lujan The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for experiments to be run at the Lujan Center's moderated neutron source during Fiscal Year 2016 (October 5, 2015, - February 6, 2016). Three nuclear science

  15. Corrective Action Program Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  16. Climate Action Champion: Technical

    Office of Environmental Management (EM)

    Learn more at energy.gov/betterbuildings Climate Action Champion: Technical Assistance to the City of Seattle Planning for Seattle's new Building Energy Code Overview The City of Seattle, identified as a Climate Action Champion (CAC) by the Department of Energy (DOE), is revising its 2012 Energy Code, already one of the most progressive in the country. Seattle has made a pledge to be carbon neutral by 2050. Seattle received technical assistance from the Pacific Northwest National Laboratory in

  17. EA-1941: Mitigation Action Plan (MAP) | Department of Energy

    Energy Savers [EERE]

    41: Mitigation Action Plan (MAP) EA-1941: Mitigation Action Plan (MAP) BPA issued a Mitigation Action Plan for avoiding or reducing the impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line. PDF icon EA-1941-MAP-2014.pdf More Documents & Publications EA-1941: Finding of No Significant Impact (FONSI) EA-1941: Final Environmental Assessment EA-1941

  18. EA-1440-S1: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1440-S1: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex, Golden, Colorado ThIs Mitigation Action Plan implements the mitigation measures associated with the potential environmental impact of a DOE proposal that consists of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office

  19. EA-1704: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    04: Mitigation Action Plan EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi This Mitigation Action Plan specifies the methods for implementing mitigation measures that address the potential environmental impacts associated with the construction and operation of a lignocellulosic ethanol refinery, BlueFire Fulton Renewable Energy, LLC in Fulton, Mississippi. PDF icon EA-1704-MAP-2010.pdf

  20. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals (GUPs) Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in the tables, for additional information about the beamline. You can

  1. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    General User Proposals (GUPs) Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research Team (PRT) that operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the beamline scientist or the local contact listed in the tables, for additional information about the

  2. Requests for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requests for Proposals Requests for Proposals World-class experts and capabilities countering all aspects of explosive threats, and aiming predominantly at enhanced detection capabilities. What LACED cannot do LACED is prohibited by US Federal Law from responding to RFPs on its own or as a co-respondent. Organizations responding to a RFP can reference a "unique" capability or service available at LACED in an RFP proposal response. Such a reference should specify that LACED

  3. Categories for CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Categories Categories for CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email CSES offers several program elements. New to CSES is a more flexible proposal schedule - not all program elements are offered in each call, and some program elements have calls more than once per

  4. General User Proposals (GUPs)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operates the beamline. Before Submitting a Proposal Review the ALS Beamlines Directory to learn about the research capabilities of individual beamlines at the ALS. Contact the...

  5. General User Proposal Scores

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Scores Print Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beam time requests exceed available beam time, a cutoff score is assigned after which no beam time is allocated. Individual Beam

  6. Categories for IGPPS Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on an independent, revolutionary scientific idea that has Los Alamos National Laboratory mission relevance. The proposed work must not be related to the programmatic research...

  7. LANSCE | User Resources | Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Resources dotline 2015 WNR Call for Proposals Proposal Submission WNR call for proposals opens April 6, 2015. Deadline: Friday, May 15, 2015, 5:00 pm (MDT). PAC: June 4 and 5, 2015. lansce.lanl.gov wnr.lanl.gov The Los Alamos Neutron Science Center (LANSCE) is issuing a Call for Proposals for the WNR facility for run cycle September - December, 2015. The Neutron and Nuclear Science Research Facility (WNR) provides neutron and proton beams, as well as detector arrays for basic, applied,

  8. Proposals and Design Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposals and Design Reports Proposals and Design Reports Proposal (1/2/04) Proposal Addendum (29/3/04) Physics Case and Detector Technology Report (12/04) Technical Design Report (7/06) Reviews DOE CD-4 DOE 2008 DOE CD-3b CD-3b Readiness DOE CD-1/2/3a CD-2/3a Readiness CD-1 Readiness PAC Report (4/05) Approvals FNAL PAC Approval: April 15, 2004 DOE Critical Decision 1,2,3a (Performance Baseline, Construction Start) Approval: March 30, 2007 DOE Critical Decision 4 (Project Completion) Approval:

  9. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  10. Building Actionable Climate Action Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Actionable Climate Action Plans Building Actionable Climate Action Plans Transcript PDF icon Presentation More Documents & Publications Partnering with Utilities Part 2: Advanced Topics for Local Governments in Creating Successful Partnerships with Utilities to Deliver Energy Efficiency Programs Effective O&M Policy in Public Buildings Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls

  11. Proposed Rules Federal Register

    Energy Savers [EERE]

    7963 Vol. 79, No. 128 Thursday, July 3, 2014 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket No. EERE-2013-BT-NOC-0039] Appliance Standards and Rulemaking Federal Advisory Committee: Cancellation of Open Meetings AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Notice of cancellation of open meetings. SUMMARY: The Department of Energy (DOE) announces the cancellation of open meetings for the Commercial and Industrial Pumps Working Group of the Appliance

  12. Proposed Rules Federal Register

    Energy Savers [EERE]

    8019 Vol. 80, No. 127 Thursday, July 2, 2015 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, and X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information (RFI). SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested

  13. Proposed Rules Federal Register

    Energy Savers [EERE]

    75798 Vol. 76, No. 233 Monday, December 5, 2011 DEPARTMENT OF ENERGY 5 CFR Chapter XXIII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties

  14. Proposed Rules Federal Register

    Energy Savers [EERE]

    28518 Vol. 77, No. 94 Tuesday, May 15, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to

  15. Proposed Rules Federal Register

    Energy Savers [EERE]

    31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory

  16. EA-1891: Mitigation Action Plan | Department of Energy

    Energy Savers [EERE]

    891: Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact for the Alvey-Fairview Transmission Line Rebuild Project. The project would rebuild the aging 97.5-mile-long 230- kilovolt (kV) Alvey-Fairview transmission line in Lane, Douglas, and Coos counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments

  17. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  18. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  19. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  20. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  1. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Approved Program Proposals (AP) Print An Approved Program (AP) enables an investigator, or a group of investigators, to receive a set percentage of beam time to partner with ALS staff both to carry out an extended research program and to develop new tools and/or new research protocols that will be made available to the general user population. APs are arranged for a period of up to three years. AP Proposal Submission Deadlines January 15 July 15 AP Proposal Submission Guidelines Step 1: Contact

  2. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    its recommendations to the ALS Division Director. A letter will be sent to the PIs of successful proposals specifying the percentage of beam time and the period of the AP. The...

  3. Proposed Rules IV. Conclusion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vol. 81, No. 44 Monday, March 7, 2016 Proposed Rules IV. Conclusion For the ... Dated at Rockville, Maryland, this 29th day of February, 2016. For the Nuclear Regulatory ...

  4. ARM - AAF Proposal Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    address aerosol-cloud interactions (i.e., studies of aerosol indirect effect, CCN, IN, etc.) or aerosol-radiation interactions. AAF is expecting to award five to six proposals with...

  5. Approved Program Proposals (AP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    be sent out for external review and will also be evaluated by the Proposal Study Panels (PSP), which will provide its evaluation to the Scientific Advisory Committee (SAC). The SAC...

  6. Proposal Study Panels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Study Panels Print Two Proposal Study Panels (PSPs) exist at the ALS: one for the general sciences and one for structural biology. The role of the PSPs is desribed in User Policy. Note: Users are urged NOT to contact any members of the panels directly. Current members of the general sciences PSP, as of February 2014, are Masa Fukuto, Brookhaven National Laboratory Carol Hirschmugl, University of Wisconsin, Milwaukee Peter Johnson (chair), Brookhaven National Laboratory Apurva Mehta,

  7. Proposal Study Panels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Study Panels Print Two Proposal Study Panels (PSPs) exist at the ALS: one for the general sciences and one for structural biology. The role of the PSPs is desribed in User Policy. Note: Users are urged NOT to contact any members of the panels directly. Current members of the general sciences PSP, as of February 2014, are Masa Fukuto, Brookhaven National Laboratory Carol Hirschmugl, University of Wisconsin, Milwaukee Peter Johnson (chair), Brookhaven National Laboratory Apurva Mehta,

  8. EA-1628: Construction and Operation of a Proposed Lignocellulosic Biorefinery, Emmetsburg, Iowa

    Broader source: Energy.gov [DOE]

    This EA evaluated the potential environmental impacts of aDOEproposal to provide financial assistance (the Proposed Action) to POET Project LIBERTY, LLC (POET) for the construction and operation...

  9. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...

    Office of Environmental Management (EM)

    Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test ...

  10. Remedial Action Performed

    Office of Legacy Management (LM)

    Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . .

  11. Remedial Action Performed

    Office of Legacy Management (LM)

    Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __

  12. Remedial Action Performed

    Office of Legacy Management (LM)

    Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel

  13. Remedial Action Performed

    Office of Legacy Management (LM)

    ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . .

  14. February 2007 Standards Actions

    Office of Environmental Management (EM)

    DOE Technical Standards Posted in RevCom for TSP 1 DOE Technical Standards in Reaffirmation 1 DOE Technical Standards Change Notices 1 DOE Technical Standards Published1 Non-Government Standards Actions 2 American National Standards Institute (ANSI) 2 American Society of Mechanical Engineers (ASME) 2 ASTM International 2 American Nuclear Society (ANS) 2 National Fire Protection Association (NFPA) 2 Publication Staff Roster 2 DOE Technical Standards Program Document Status 01-26-2007 Activity

  15. Interim Action Determination

    Office of Environmental Management (EM)

    Interim Action Determination Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site The Department of Energy (DOE) is preparing the Surplus Plutonium Disposition Supplemental Environmental Impact Statement (SPD SEIS, DOE/EIS-0283-S2). DOE is evaluating alternatives for disposition of non-pit plutonium that is surplus to the national security needs of the United States. Although the Deputy Secretary of Energy approved Critical

  16. Proposed environmental remediation at Argonne National Laboratory, Argonne, Illinois

    SciTech Connect (OSTI)

    1997-05-01

    The Department of Energy (DOE) has prepared an Environmental Assessment evaluating proposed environmental remediation activity at Argonne National Laboratory-East (ANL-E), Argonne, Illinois. The environmental remediation work would (1) reduce, eliminate, or prevent the release of contaminants from a number of Resource Conservation and Recovery Act (RCRA) Solid Waste Management Units (SWMUs) and two radiologically contaminated sites located in areas contiguous with SWMUs, and (2) decrease the potential for exposure of the public, ANL-E employees, and wildlife to such contaminants. The actions proposed for SWMUs are required to comply with the RCRA corrective action process and corrective action requirements of the Illinois Environmental Protection Agency; the actions proposed are also required to reduce the potential for continued contaminant release. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required.

  17. EA-1993: Proposed High Explosive Science & Engineering Project, Pantex

    Office of Environmental Management (EM)

    Plant, Amarillo, Texas | Department of Energy 3: Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas EA-1993: Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas SUMMARY The proposed action would be to design, construct, and operate a High Explosive Science and Engineering (HE S&E) facility that would support NNSA's mission at the Pantex Plant. This would include developing and sustaining high quality scientific

  18. 2013 Electricity Form Proposals

    Gasoline and Diesel Fuel Update (EIA)

    Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice

  19. Environmental Assessment for the proposed modification and continued operation of the DIII-D facility

    SciTech Connect (OSTI)

    NONE

    1995-07-01

    The EA evaluates the proposed action of modifying the DIII-D fusion facility and conducting related research activities at the GA San Diego site over 1995-1999 under DOE contract number DE-ACO3-89ER51114. The proposed action is need to advance magnetic fusion research for future generation fusion devices such as ITER and TPX. It was determined that the proposed action is not a major action significantly affecting the quality of the human environment according to NEPA; therefore a finding of no significant impact is made and an environmental impact statement is not required.

  20. Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada

    SciTech Connect (OSTI)

    K. Campbell

    2000-04-01

    This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

  1. Proposed Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

  2. Proposed Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2013-06-28

    Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

  3. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  4. Notices ACTION: Notice.

    Energy Savers [EERE]

    867 Federal Register / Vol. 80, No. 215 / Friday, November 6, 2015 / Notices ACTION: Notice. SUMMARY: This notice announces EPA's receipt of an application 91163-EUP-R from Texas Corn Producers Board requesting an experimental use permit (EUP) for the Aspergillus flavus strains TC16F, TC35C, TC38B, and TC46G. The Agency has determined that the permit may be of regional and national significance. Therefore, because of the potential significance, EPA is seeking comments on this application. DATES:

  5. RCRA corrective action and closure

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators` interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE`s permitted facilities and interim status facilities.

  6. Proposed Rules IV. Conclusion

    Energy Savers [EERE]

    686 Federal Register / Vol. 81, No. 44 / Monday, March 7, 2016 / Proposed Rules IV. Conclusion For the reasons cited in this document, the NRC is denying PRM- 50-106. The NRC is denying this petition because the current regulations already address environmental qualification in both mild and design basis event conditions of electrical equipment located both inside and outside of the containment building that is important to safety, and the petitioners did not provide significant new or

  7. EA-1951: Finding of No Significant Impact and Mitigation Action Plan |

    Energy Savers [EERE]

    Department of Energy 1951: Finding of No Significant Impact and Mitigation Action Plan EA-1951: Finding of No Significant Impact and Mitigation Action Plan Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington Bonneville Power Administration issued a Finding of No Significant Impact and Mitigation Action Plan for the proposed rebuilding of the 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the

  8. EIS-0425: Record of Decision and Mitigation Action Plan | Department of

    Office of Environmental Management (EM)

    Energy 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and

  9. Sodium dichromate expedited response action assessment

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) perform an expedited response action (ERA) for the Sodium Dichromate Barrel Disposal Landfill. The ERA lead regulatory agency is Ecology and EPA is the support agency. The ERA was categorized as non-time-critical, which required preparation of an engineering evaluation and cost analysis (EE/CA). The EE/CA was included in the ERA proposal. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA goal is to reduce the potential for any contaminant migration from the landfill to the soil column, groundwater, and Columbia River. Since the Sodium Dichromate Barrel Disposal Landfill is the only waste site within the operable unit, the removal action may be the final remediation of the 100-IU-4 Operable Unit. This ERA process started in March 1992. The ERA proposal went through a parallel review process with Westinghouse Hanford Company (WHC), DOE Richland Operations (RL), EPA, Ecology, and a 30-day public comment period. Ecology and EPA issued an Action Agreement Memorandum in March 1993 (Appendix A). The memorandum directed excavation of all anomalies and disposal of the collected materials at the Hanford Site Central Landfill. Primary field activities were completed by the end of April 1993. Final waste disposal of a minor quantity of hazardous waste was completed in July 1993.

  10. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  11. Emergencies and Emergency Actions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Emergency Actions Emergencies and Emergency Actions Selected documents on the topic of Emergencies and Emergency Actions under NEPA. May 12, 2010 Memorandum for Heads of...

  12. Climate Action Tracker | Open Energy Information

    Open Energy Info (EERE)

    References: Climate Action Tracker1 "This "Climate Action Tracker" is an independent science-based assessment, which tracks the emission commitments and actions of countries. The...

  13. EA-1595: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor approximately 61 miles of 230-kV transmission line from the Davis Substation at Davis Dam near Bullhead City, Arizona, to the Mead Substation near Boulder City in southern Nevada. PDF icon Mitigation Action Plan for the Davis-Mead 230-kV Transmission Line Reconductor Project, DOE/EA-1595 (November 2007) More Documents &

  14. Proposed solar two project Barstow, California

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This Environmental Assessment (EA) evaluates the environmental consequences of the proposed conversion and operation of the existing Solar One Facility in Daggett, Ca, near the city of Barstow, to a nitrate salt based heat transfer system, Solar Two. The EA also addresses the alternatives of different solar conversion technologies and alternative sites and discusses a no action alternative. A primary objective of the Solar Two Project is to demonstrate the technical and economic feasibility of a solar central receiver power plant using molten salt as the thermal storage and transport fluid medium. If successful, the information gathered from the Solar Two Project could be used to design larger commercial solar power plants.

  15. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  16. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  17. Proposed Remedial Action Plan: Proposed Plan for Remedial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site. DOE/OR/21548-724

    Office of Legacy Management (LM)

  18. Proposal Types | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from anywhere in the world to use the APS through a competitive access process. CAT Member and Staff Proposals Proposals from members and staff of Collaborative Access...

  19. http://www.oha.doe.gov/regs/Proposed708.htm

    Broader source: Energy.gov (indexed) [DOE]

    [6450.01P] DEPARTMENT OF ENERGY 10 CFR PART 708 [RIN 1901-AA78] Criteria and Procedures for DOE Contractor Employee Protection Program AGENCY: Department of Energy ACTION: Notice of proposed rulemaking SUMMARY: The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental,

  20. Evaluation Criteria for PDIL Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Criteria for PDIL Proposal The selection/decision criteria used by the NCPV Business Development Team are the following: 1. Quality and Relevance of the Proposed Technical Plan (30%) * Technology impact with industry and likelihood of success. Demonstrated benefits of success to both the proposer and NREL to meet the DOE SunShot goals. * Proposed task descriptions and time line. Clear demonstration of entrance and exit strategies in the PDIL. * Extent to which the Proposer and NREL can rapidly

  1. Wong's equations and the small x effective action in QCD (Journal Article)

    Office of Scientific and Technical Information (OSTI)

    | SciTech Connect Wong's equations and the small x effective action in QCD Citation Details In-Document Search Title: Wong's equations and the small x effective action in QCD We propose a new form for the small x effective action in QCD. This form of the effective action is motivated by Wong's equations for classical, colored particles in non-Abelian background fields. We show that the BFKL equation, which sums leading logarithms in x, is efficiently reproduced with this form of the action.

  2. Enforcement actions: Significant actions resolved individual actions. Semiannual progress report, January 1996--June 1996

    SciTech Connect (OSTI)

    1996-08-01

    This document summarizes significant enforcement actions that have been resolved during the period of January-June 1996. The report includes copies of Orders and Notices of Violations sent by the Nuclear Regulatory Commission to individuals with respect to the enforcement actions.

  3. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage

    Office of Environmental Management (EM)

    Determination (Energy Conservation Standard) for Set-Top Boxes | Department of Energy Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes December 23, 2013 - 12:00am Addthis The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice

  4. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  5. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  6. ARM - Submitting Proposals : Guideline Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govField CampaignsSubmitting Proposals : Guideline Overview Guidelines Overview Annual Facility Call Small Field Campaigns Review Criteria Expectations for Principal Investigators Forms Propose a Campaign Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps for Submitting Field Campaign Data and Metadata Field Campaign Guidelines (PDF, 574KB) Submitting Proposals : Guideline Overview Proposals are welcome from all members of the scientific community for conducting field

  7. Unsolicited Proposals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unsolicited Proposals Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas. http://www.netl.doe.gov/business/usp/unsol.html

  8. Method for triggering an action

    DOE Patents [OSTI]

    Hall, David R.; Bartholomew, David B.; Johnson, Monte L.; Moon, Justin; Koehler, Roger O.

    2006-10-17

    A method for triggering an action of at least one downhole device on a downhole network integrated into a downhole tool string synchronized to an event comprises determining latency, sending a latency adjusted signal, and performing the action. The latency is determined between a control device and the at least one downhole device. The latency adjusted signal for triggering an action is sent to the downhole device. The action is performed downhole synchronized to the event. A preferred method for determining latency comprises the steps: a control device sends a first signal to the downhole device; after receiving the signal, the downhole device sends a response signal to the control device; and the control device analyzes the time from sending the signal to receiving the response signal.

  9. ICDF Complex Remedial Action Report

    SciTech Connect (OSTI)

    W. M. Heileson

    2007-09-26

    This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

  10. Webinar for Tribes, States, Local Governments, and Territories on the Clean Power Plan Supplemental Proposal

    Broader source: Energy.gov [DOE]

    On Tuesday, October 28, 2014, EPA issued an action related to the proposed Clean Power Plan to cut carbon pollution from power plants. EPA is following through on its commitment made in June to...

  11. EA-1931: Finding of No Significant Impact and Mitigation Action Plan |

    Energy Savers [EERE]

    Department of Energy 1: Finding of No Significant Impact and Mitigation Action Plan EA-1931: Finding of No Significant Impact and Mitigation Action Plan Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville Power Administration issued a finding of no significant impact and a mitigation action plan for the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of

  12. EA-1946: Finding of No Significant Impact and Mitigation Action Plan |

    Energy Savers [EERE]

    Department of Energy 6: Finding of No Significant Impact and Mitigation Action Plan EA-1946: Finding of No Significant Impact and Mitigation Action Plan Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration issued a finding of no significant impact and mitigation action plan for the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. PDF

  13. FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:

    Office of Legacy Management (LM)

    FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in

  14. Enforcement actions: Significant actions resolved individuals actions. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period (July - December 1996) and includes copies of Orders and Notices of Violation sent by the Nuclear Regulatory Commission to individuals with respect to-these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  15. Part 3: Removal Action | Department of Energy

    Office of Environmental Management (EM)

    3: Removal Action Part 3: Removal Action Question: When may removal actions be initiated? Answer: Removal actions may be initiated when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to health or the environment. The NCP specifies that the determination that a risk to health or the environment is appropriate for removal action should be based on: actual or potential exposure of humans, animals, or the food chain the presence of contained hazardous

  16. Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    20.4 38.3 events) is observed at lower energies (E < 475 MeV), where the first error is statistical and the second error is systematic. The lack of a significant excess at...

  17. Energy Action Month October 2013 Poster

    Broader source: Energy.gov [DOE]

    Poster for Federal Energy Management Program (FEMP) features slogan "Take Action Now: Empower a Secure Energy Future" for October 2013 Energy Action Month.

  18. California Climate Action Registry | Open Energy Information

    Open Energy Info (EERE)

    Climate Action Registry Jump to: navigation, search Name: California Climate Action Registry Place: Los Angeles, California Zip: 90014 Product: Los Angeles-based NPO which develops...

  19. Climate Action Plan | OpenEI Community

    Open Energy Info (EERE)

    actions that the administration believes will mitigate the environmental and economic costs of climate change. Obama's six Climate Action Initiatives: 1. Phasing out Fossil Fuels...

  20. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose ofthis Corrective Action Plan (CAP) is to specify U.S. Department of ...

  1. Climate Protection Action Fund | Open Energy Information

    Open Energy Info (EERE)

    Repower America Retrieved from "http:en.openei.orgwindex.php?titleClimateProtectionActionFund&oldid767417" Categories: Organizations Political Action Committees Policy...

  2. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE)...

  3. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    I Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase I The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of...

  4. Energy Agency Coordinators for Energy Action Month

    Broader source: Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  5. Renewable Energy Action Project | Open Energy Information

    Open Energy Info (EERE)

    Action Project Jump to: navigation, search Name: Renewable Energy Action Project Place: San Francisco, California Zip: 94107 Product: REAP is a San Francisco-based non-profit...

  6. Presidential Climate Action Project | Open Energy Information

    Open Energy Info (EERE)

    Page Edit with form History Presidential Climate Action Project Jump to: navigation, search Name: Presidential Climate Action Project Place: Denver, Colorado Zip: 80217-3364...

  7. Inter Action Corp | Open Energy Information

    Open Energy Info (EERE)

    Action Corp Jump to: navigation, search Name: Inter Action Corp Place: Kanagawa, Japan Zip: 236-0004 Product: Semiconductor equipment and testing devices maker building a PV...

  8. High order Chin actions in path integral Monte Carlo

    SciTech Connect (OSTI)

    Sakkos, K.; Casulleras, J.; Boronat, J.

    2009-05-28

    High order actions proposed by Chin have been used for the first time in path integral Monte Carlo simulations. Contrary to the Takahashi-Imada action, which is accurate to the fourth order only for the trace, the Chin action is fully fourth order, with the additional advantage that the leading fourth-order error coefficients are finely tunable. By optimizing two free parameters entering in the new action, we show that the time step error dependence achieved is best fitted with a sixth order law. The computational effort per bead is increased but the total number of beads is greatly reduced and the efficiency improvement with respect to the primitive approximation is approximately a factor of 10. The Chin action is tested in a one-dimensional harmonic oscillator, a H{sub 2} drop, and bulk liquid {sup 4}He. In all cases a sixth-order law is obtained with values of the number of beads that compare well with the pair action approximation in the stringent test of superfluid {sup 4}He.

  9. Price/Cost Proposal Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRICE/COST PROPOSAL FORM Page No. of NREL Solicitation Document Number: Offeror's Name and Address: Title of Proposed Effort and Task No., Phase No., or Project Total, As Applicable: Telephone Number: Total Amount of Task/Phase No. ___________ $ _______________________ Proposal Summary Total $ ________________________ DETAIL DESCRIPTION OF COST ELEMENTS 1. DIRECT MATERIALS (Attach Itemized Listing for all Purchased Parts, Purchased Items or Services, Raw Materials, Standard Commercial Items, or

  10. Unsolicited Proposals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas. http:www.netl.doe.govbusinessuspunsol.html...

  11. CEQ Guidance on the Application of NEPA to Proposed Federal Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    While the guidance arises in the context of negotiations undertaken with the governments of Mexico and Canada to develop an agreement on transboundary environmental impact ...

  12. Appliance Standard Program - The FY 2003 Priority -Setting Summary Report and Actions Proposed - Appendix B

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPENDIX B: Data Sheets for Existing Products Table of Contents Product Rulemaking Priority Page Product Rulemaking Priority Page Commercial Air-Cooled Central A/C & Air-Source HP, 65-240 kBtu/h Standards High B-1 High Intensity Discharge Lamps Determination High B-27 Central A/C & HP, 3 phase, < 65 kBtu/h Standards Medium B-2 Test Procedure Low B-28 Clothes Dryers Standards Low B-3 Lamps, Fluorescent Standards Low B-29 Test Procedure Low B-4 Test Procedure Low B-30 Clothes Washers

  13. Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed - Appendix C

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPENDIX C: Data Sheets for New Products Table of Contents Product Page Product Page Commercial Refrigeration Miscellaneous Residential Equipment Standards Consideration C-1 Standards Consideration C-50 Beverage Merchandisers Test Procedure Summary C-3 Ceiling Fans Test Procedure Summary C-52 Standards Consideration C-4 Compact Audio Standards Consideration C-53 Ice Machines Test Procedure Summary C-6 Component Stereo and Rack Audio Standards Consideration C-54 Reach-In Freezers Standards

  14. Appliance Standards Program - The FY 2003 Priority Setting Report and Actions Proposed -Appendix A

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPENDIX A: Technical Support Document (TSD) Appendixes i A1 Introduction ........................................................................................ A1-1 A1.1 Methodology for Energy Consumption and Savings Estimate............... A1-2 A1.2 Energy Consumption and Savings Calculation Methodology ................ A1-3 A1.2.1 Device Annual Energy Consumption (AEC) Estimates ...........................A1-3 A1.2.1.1 Equipment Stock,

  15. Description of Proposed Interim Remedial Action at the Weldon Spring Site.

    Office of Legacy Management (LM)

  16. Transcript of Proceedings: Quarry Waste Removal Proposed Plan Weldon Spring Site Remedial Action Projec

    Office of Legacy Management (LM)

  17. Letter: EPA has reviewed the DOE's proposals for the following four interim response actions

    Office of Legacy Management (LM)

  18. Proposal of Removal Action in the Southeast Drainage. SE-200-201-1.07.

    Office of Legacy Management (LM)

  19. Proposals For Four Interim Response Actions. IR-600-604-1.01.

    Office of Legacy Management (LM)

  20. Proposed Interim Response Action, Construction of Ash Pond Isolation System at the Weldon Spring Site.

    Office of Legacy Management (LM)

  1. Texas Solar Collaboration Action Plan

    SciTech Connect (OSTI)

    Winland, Chris

    2013-02-14

    Texas Solar Collaboration Permitting and Interconenction Process Improvement Action Plan. San Antonio-specific; Investigate feasibility of using electronic signatures; Investigate feasibility of enabling other online permitting processes (e.g., commercial); Assess need for future document management and workflow/notification IT improvements; Update Information Bulletin 153 regarding City requirements and processes for PV; Educate contractors and public on CPS Energys new 2013 solar program processes; Continue to discuss downtown grid interconnection issues and identify potential solutions; Consider renaming Distributed Energy Resources (DER); and Continue to participate in collaborative actions.

  2. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect (OSTI)

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: Determine whether COCs are present. If COCs are present, determine their nature and extent. Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. Clean closure is recommended for the remaining 10 CASs in CAU 562. A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.

  3. Guidance Regarding Actions That May Proceed During the NEPA Process...

    Office of Environmental Management (EM)

    Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide...

  4. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    SciTech Connect (OSTI)

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

  5. POST-REMEDIAL ACTION REPORT

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT . FORTHE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA SEPTEMBER 1995 Prepared for United States' Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACQ5-910R2 1949 Gchtel National, 1nc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r FIGURES iv . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  6. Appendix VI Corrective Action Strategy

    National Nuclear Security Administration (NNSA)

    VI Corrective Action Strategy Revision No.: 2 February 2008 Federal Facility Agreement and Consent Order (FFACO) FFACO, Appendix VI February 2008 Revision 2 Page i of v Table of Contents List of Figures ................................................................................................................................ iii List of Tables ................................................................................................................................. iv List of Acronyms

  7. The proposed Institute for Micro-manufacturing, Louisiana Tech University

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) DOE/EA-0958, evaluating the construction and equipping of two components of the proposed Institute for Micro-manufacturing at Louisiana Tech University (LTU), a proposed R and D facility to be located in Ruston, LA. and, the proposed installation of a beamline for micro-machining applications at the Center for Advanced Microstructures and Devices (CAMD) facility at Louisiana State University in Baton Rouge, LA. The objective of the proposed project is to focus on the applied, rather than basic research emphasizing the design and development, metrology, inspection and testing, and the assembly and production of micron and submicron structures and devices. Also, the objective of the beamline at CAMD would be the fundamental study of processing and analysis technologies, including x-ray lithography, which are important to microstructures fabrication and electronic device development. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required.

  8. Original Workshop Proposal and Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Notes for Vis Requirements » Original Workshop Proposal and Description Original Workshop Proposal and Description Visualization Requirements for Computational Science and Engineering Applications Proposal for a DoE Workshop to Be Held 
at the Berkeley Marina Radisson Hotel,
Berkeley, California, June 5, 2002
(date and location are tenative) Workshop Co-organizers: Bernd Hamann 
University of California-Davis Lawrence Berkeley Nat'l Lab. E. Wes Bethel 
Lawrence Berkeley Nat'l Lab.

  9. Climate Action Champions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Initiatives » Climate Action Champions Climate Action Champions Climate Action Champions In the fall of 2014, the White House launched the Climate Action Champions competition to identify and recognize local climate leaders and provide targeted Federal support to help those communities further their ambitions. Following a competitive process led by the U.S. Department of Energy (DOE), the Administration announced 16 designees from around the country as the first class of Climate Action

  10. Original Workshop Proposal and Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Engineering Applications Proposal for a DoE Workshop to Be Held at the Berkeley Marina Radisson Hotel,Berkeley, California, June 5, 2002(date and location are...

  11. Technical Proposal Disclosure Policy - ITER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Disclosure Policy - ITER Pursuant to this solicitation, UT-Battelle will treat confidential proposal information as such and will disclose such information on a need to know basis to UT-Battelle employees and agents, DOE, and ITER- International Organization (ITER-IO) representatives for purposes of evaluation. It is hereby noted that any information distributed to ITER-IO will be of a technical nature; pricing information will not be distributed to ITER-IO.

  12. Research Proposals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How to Apply » Research Proposals Research Proposals The EERE Postdoctoral Research Awards are intended to be an avenue for significant energy efficiency and renewable energy innovation. To enable the participant's creativity as they conduct their postdoctoral research, the Research Awards have been designed to follow the "Innovation Time Out" model so that participants allot roughly 80% of their time to their core project research tasks and 20% of their time to "innovation"

  13. DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for

    Office of Environmental Management (EM)

    Failure to Certify 116 Products | Department of Energy against 4 Showerhead Manufacturers for Failure to Certify 116 Products DOE Institutes Enforcement Action against 4 Showerhead Manufacturers for Failure to Certify 116 Products January 28, 2010 - 1:49pm Addthis WASHINGTON DC - The Office of General Counsel has issued Notices of Proposed Civil Penalty to Zoe Industries, Altmans Products LLC, EZ-FLO International, and Watermark Designs, Ltd. for failing to certify to the Department of

  14. Action Sheet 36 Final Report

    SciTech Connect (OSTI)

    Kips, R E; Kristo, M J; Hutcheon, I D

    2012-02-24

    Pursuant to the Arrangement between the European Commission DG Joint Research Centre (EC-JRC) and the Department of Energy (DOE) to continue cooperation on research, development, testing, and evaluation of technology, equipment, and procedures in order to improve nuclear material control, accountancy, verification, physical protection, and advanced containment and surveillance technologies for international safeguards, dated 1 September 2008, the IRMM and LLNL established cooperation in a program on the Study of Chemical Changes in Uranium Oxyfluoride Particles under IRMM-LLNL Action Sheet 36. The work under this action sheet had 2 objectives: (1) Achieve a better understanding of the loss of fluorine in UO{sub 2}F{sub 2} particles after exposure to certain environmental conditions; and (2) Provide feedback to the EC-JRC on sample reproducibility and characteristics.

  15. Take the Energy Action Challenge

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students will work in pairs or small groups to apply knowledge of energy-wise habits to evaluate energy use in their homes and schools and make recommendations for improved efficiency. They will use an energy audit tool to collect data on their home and school energy habits and present an action plan to their class. Further communication at the school and district level is encouraged.

  16. Portsmouth Proposed Plan for the Site-wide Waste Disposition Evaluation

    Energy Savers [EERE]

    Project | Department of Energy Proposed Plan for the Site-wide Waste Disposition Evaluation Project Portsmouth Proposed Plan for the Site-wide Waste Disposition Evaluation Project DOE has evaluated alternatives for managing waste that would be created by decomtamination and decommissioning of the buildings at the Portsmouth Site. Three remedial alternatives for management of anticipated Portsmouth waste were developed for consideration. This Proposed Plan describes the required no-action

  17. proposed surface and subsurface marker designs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Images of proposed markers for the surface and subsurface Large Surface Marker - Proposed Design with Plaques of Text and Images Small Subsurface Marker - Proposed Design

  18. Proposed Changes to Electricity and Renewable (Photovoltaic)...

    U.S. Energy Information Administration (EIA) Indexed Site

    2017 Proposed Solar & Electricity Survey Form Changes 1 November 2015 Proposed Changes to Electricity and ... U.S. Energy Information Administration | 2017 Proposed Solar & ...

  19. Proposal Submittal and Scheduling Procedures for Macromolecular...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit...

  20. Category:Proposed deletion | Open Energy Information

    Open Energy Info (EERE)

    History Category:Proposed deletion Jump to: navigation, search This category contains articles which have been proposed for deletion. To tag an article for proposed deletion use...

  1. City of Boulder- Climate Action Plan Fund

    Broader source: Energy.gov [DOE]

    Note: As of 2015, the Climate Action Plan is now referred to as the Climate Commitment. In November 2015, Boulder voters approved an extension of the  Climate Action Plan tax through 2020, with...

  2. NREL: Technology Deployment - Climate Action Planning Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Technology Deployment Climate Action Planning Tool Technology Deployment - Climate Action Planning Tool NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to identify which options will lead to the most significant reductions in consumption of fossil fuels and in turn meet greenhouse gas reduction goals. Follow these four steps: Gather baseline energy

  3. SEAB Climate Action Plan | Department of Energy

    Energy Savers [EERE]

    SEAB Climate Action Plan SEAB Climate Action Plan A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. PDF icon Climate Action Plan (pdf) More Documents & Publications U.S. Energy Sector Vulnerabilities to Climate Change and Extreme Weather Climate Change and the U.S. Energy Sector: Regional Vulnerabilities and Resilience Solutions Climate Change: Energy and Community Impacts

  4. Energy Action Month October 2014 Campaign Materials

    Broader source: Energy.gov [DOE]

    Campaign materials for "Transition to a Clean Energy Reality," the theme for Energy Action Month October 2014.

  5. Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Climate Action Plan Climate Action Plan Since President Obama's announcement of the Climate Action Plan (CAP) on June 25, 2013, the Department of Energy (DOE) has moved forward to lead initiatives and support interagency efforts that cut carbon pollution, augment resilience and preparedness in the face of climate impacts, and strengthen international partnerships addressing the issue. This effort involves activities all across the Department, including actions led by the Office of International

  6. Energy Action Month | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Action Month Energy Action Month Energy Action Month Lead our nation to a secure, clean, and prosperous energy future As proclaimed by President Obama, October marks Energy Action Month. With the March announcement of Executive Order 13693: Planning for Federal Sustainability in the Next Decade, the federal government faces even more challenging goals to reduce energy consumption. Agencies are committed to stepping up and adopting more sustainable operations to cut greenhouse gas

  7. EM International Program Action Table

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM INTERNATIONAL COOPERATIVE PROGRAM] October, 2012 E M I n t e r n a t i o n a l P r o g r a m s Page 1 ACTION TABLE Subject Lead Office Engaging Country Meeting Location Purpose Status Date of Event 3 rd US/German Workshop on Salt Repository Research, Design and Operations N. Buschman, EM-22 Germany Albuquerque & Carlsbad, NM Continue collaboration with Germans on salt repository research, design and operations. Draft agenda prepared. October 8-12, 2012 International Framework for Nuclear

  8. COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A (May, 2014) COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS Applicability: This section is applicable to all elements of the Department of Energy including the National Nuclear Security Administration. References: * Section 627 of the Energy Policy Act of 2005, codified at 42 U.S.C. 5853 * DEAR 931.205-47(h), Costs related to legal and other proceedings * DEAR 952.216-7, Allowable cost and payment * DEAR 970.3102-05-47(h), Costs related to legal and other proceedings * DEAR 970.5232-2, Payments

  9. Environmental Assessment and FONSI Proposed Decontamination and Disassembly of the Argonne Thermal Source Reactor (ATSR) at Argonne National Laboratory

    SciTech Connect (OSTI)

    N /A

    1998-07-15

    The purpose of this project is to protect human health and the environment from risks associated with the contaminated surplus ATSR. The proposed action is needed because the ATSR, a former experimental reactor, contains residual radioactivity and hazardous materials.

  10. Allocation Proposal (ERCAP) Application Deadlines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Application Deadlines Allocation Proposal (ERCAP) Application Deadlines Award Type ERCAP Submission Open ERCAP Submission Deadline Award Decision Allocation Period Startup and Education Ongoing November 10, 2016 Within 3 weeks of applying 18 months from award (but must be renewed for the next allocation year) Production (DOE awarded) for the rest of allocation year (AY) 2016 Ongoing November 10, 2016 Within 4 weeks of applying (pending sufficient DOE reserves of time) through January 9, 2017 All

  11. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect (OSTI)

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  12. EIS-0397: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

  13. EA-1923: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1923: Mitigation Action Plan Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This Mitgation Action Plan ...

  14. China-Partnership for Climate Action | Open Energy Information

    Open Energy Info (EERE)

    Partnership for Climate Action (Redirected from Partnership for Climate Action - China) Jump to: navigation, search Name Partnership for Climate Action - China AgencyCompany...

  15. III. Waiver of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    82 Federal Register / Vol. 77, No. 241 / Friday, December 14, 2012 / Rules and Regulations technical errors in § 447.400(a) and § 447.405 listed on page 66701. One correction ensures consistency between two sentences in the same paragraph and the other restores text inadvertently omitted from the final rule that had been included in the May 11, 2012 notice of proposed rulemaking (77 FR 27671) on pages 26789-90. Thus, we are correcting page 66701 to reflect the correct information. III. Waiver

  16. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  17. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  18. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  19. Proposal Submittal and Scheduling Procedures for Macromolecular

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crystallography | Stanford Synchrotron Radiation Lightsource Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal

  20. Key Actions for Optimizing for KNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Key Actions for Optimizing for KNL Key Actions for Optimizing for KNL This webinar consisted of a presentation by Nathan Wichmann of Cray entitled, "Key Actions When Optimizing for KNL." Nathan is a Principal Performance Engineer responsible for tackling performance problems at Cray for many years and he is our contact for the NERSC/Cray Cori Applications Center of Excellence. Nathan's presentation results, in part, from his participation in several "brainstorming" telecons

  1. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  2. Solar Action Network | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Solar Action Network Address: PO Box 15546 Place: San Luis Obispo, California Zip: 93401 Phone Number: 5058476527 Website:...

  3. Climate Protection Action Fund | Open Energy Information

    Open Energy Info (EERE)

    Repower America References The Climate Protetion Action Fund - Contact Us Learn More About Repower America Retrieved from "http:en.openei.orgw...

  4. Action Codes Table | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    NNSA Blog Home About Us Our Programs Defense Nuclear Security Nuclear Materials Management & Safeguards System NMMSS Information, Reports & Forms Code Tables Action...

  5. Mitigation Action Implementation Network (MAIN) | Open Energy...

    Open Energy Info (EERE)

    of Nationally Appropriate Mitigation Actions (NAMAs) and Low-Carbon Development (LCD) strategies in developing countries through regionally based dialogues, web-based...

  6. Worldwide Energy Efficiency Action through Capacity Building...

    Open Energy Info (EERE)

    Capacity Building and Training (WEACT) Jump to: navigation, search Logo: Worldwide Energy Efficiency Action through Capacity Building and Training (WEACT) Name Worldwide...

  7. Utilities Working with Industry: Action Plan

    SciTech Connect (OSTI)

    none,

    2010-06-25

    This action plan outlines joint ITP and utility activities that will help reach a national goal of reducing energy by 25 percent over then next 10 years.

  8. Rainforest Action Network RAN | Open Energy Information

    Open Energy Info (EERE)

    pressure corporations into publicly adopting policies that protect rainforests and the human rights of those living in those areas. References: Rainforest Action Network (RAN)1...

  9. A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes

    SciTech Connect (OSTI)

    Traceski, Thomas T.

    1994-02-01

    This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

  10. NSR&D Call for Proposals 2016

    Broader source: Energy.gov [DOE]

    The Call for Proposals memorandum represents the official 2016 Call for Proposals for the Department of Energy (DOE) Nuclear Safety Research and Development (NSR&D) Program.

  11. LOPP Proposal Checklist | Open Energy Information

    Open Energy Info (EERE)

    of specific proposal requirements for lease of power privilege proposals. Author Bureau of Reclamation Published Department of Interior, 2015 DOI Not Provided Check for DOI...

  12. Rulison Site corrective action report

    SciTech Connect (OSTI)

    1996-09-01

    Project Rulison was a joint US Atomic Energy Commission (AEC) and Austral Oil Company (Austral) experiment, conducted under the AEC`s Plowshare Program, to evaluate the feasibility of using a nuclear device to stimulate natural gas production in low-permeability gas-producing geologic formations. The experiment was conducted on September 10, 1969, and consisted of detonating a 40-kiloton nuclear device at a depth of 2,568 m below ground surface (BGS). This Corrective Action Report describes the cleanup of petroleum hydrocarbon- and heavy-metal-contaminated sediments from an old drilling effluent pond and characterization of the mud pits used during drilling of the R-EX well at the Rulison Site. The Rulison Site is located approximately 65 kilometers (40 miles) northeast of Grand Junction, Colorado. The effluent pond was used for the storage of drilling mud during drilling of the emplacement hole for the 1969 gas stimulation test conducted by the AEC. This report also describes the activities performed to determine whether contamination is present in mud pits used during the drilling of well R-EX, the gas production well drilled at the site to evaluate the effectiveness of the detonation in stimulating gas production. The investigation activities described in this report were conducted during the autumn of 1995, concurrent with the cleanup of the drilling effluent pond. This report describes the activities performed during the soil investigation and provides the analytical results for the samples collected during that investigation.

  13. NE-24 Unlverslty of Chicayo Remedial Action Plan

    Office of Legacy Management (LM)

    (YJ 4 tlsj .?I2 416 17 1983 NE-24 Unlverslty of Chicayo Remedial Action Plan 22&d 7 IA +-- E. I.. Keller, Director Technical Services Division Oak Ridge Operations Ufflce In response to your memorandum dated July 29, 1983, the Field Task Proposal/Agreement (FTP/A) received frw Aryonne National Laboratory (ANL) appears to be satisfactory, and this office concurs in the use of ANL to provide the decontamination effort as noted in the FTP/A. The final decontaminatton report should Include the

  14. Guidance Regarding Actions That May Proceed During the NEPA Process:

    Office of Environmental Management (EM)

    Interim Actions | Department of Energy Actions That May Proceed During the NEPA Process: Interim Actions Guidance Regarding Actions That May Proceed During the NEPA Process: Interim Actions DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines

  15. Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    K. B. Campbell

    2002-06-01

    This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are inactive or abandoned. However, some leachfields may still receive liquids from runoff during storm events. Results from the 2000-2001 site characterization activities conducted by International Technology (IT) Corporation, Las Vegas Office are documented in the Corrective Action Investigation Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. This document is located in Appendix A of the Corrective Action Decision Document for CAU 262. Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada. (DOE/NV, 2001).

  16. Portsmouth Proposed Plan for the Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project

    Broader source: Energy.gov [DOE]

    DOE has evaluated alternatives for demolishing the buildings at the Portsmouth Site. Two remedial alternatives were developed for consideration. This Proposed Plan describes the required no-action alternative (Alternative 1) and a D&D alternative (Alternative 2). The preferred alternative is Alternative 2, controlled demolition of the process buildings and complex facilities.

  17. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    SciTech Connect (OSTI)

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  18. Annual status report on the Uranium Mill Tailings Remedial Action Program

    SciTech Connect (OSTI)

    Not Available

    1985-12-01

    FY 1985 project accomplishments include: completed 90% of the processing site remedial actions at Canonsburg, Pennsylvania, and initiated remedial actions at Salt Lake City, Utah, and Shiprock, New Mexico; awarded remedial action contracts on 329 vicinity properties at seven designated locations and completed survey and inclusion activities on a total of 1620 vicinity properties; published the Environmental Assessment (EA) for Lakeview, Oregon, issued the draft and prepared the final Environmental Impact Statement (EIS) for Durango, Colorado; completed the Remedial Action Plan (RAP) for Lakeview, Oregon, and prepared the draft RAP for Durango, Colorado; executed cooperative agreements with Idaho, New Mexico, and the Navajo Nation/Hopi Tribe; executed a Memorandum of Understanding with the Nuclear Regulatory Commission; and developed proposed UMTRA Project design review criteria between DOE and the NRC.

  19. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    SciTech Connect (OSTI)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  20. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  1. Call for General User Proposals - Upcoming Deadline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call for General User Proposals - Upcoming Deadline Call for General User Proposals - Upcoming Deadline Print The User Office is accepting new General User Proposals (GUPs) from scientists who wish to conduct research at the ALS in the 2016-2 July-Dec cycle. PROPOSAL SUBMISSION DEADLINE: March 2, 2016 Please log in to ALSHub to submit a new GUP or to make a Beam Time Request (BTR) on an existing active proposal. Users are reminded that they need to have an ALSHub account to submit proposals, and

  2. President's Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Energy in the United States » President's Climate Action Plan President's Climate Action Plan President’s Climate Action Plan In June 2013, President Obama put forward a broad-based plan to cut the carbon pollution that causes climate change and affects public health. Cutting carbon pollution will help spark business innovation to modernize our power plants, resulting in cleaner forms of American-made energy that will create good jobs and cut our dependence on foreign oil. Combined

  3. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    SciTech Connect (OSTI)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  4. Proposal Form Guidelines | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Form Guidelines Please read the Proposal Form Description and Guidelines entirely before submitting a proposal (pdf version). You must register online through the User Facility Registration System BEFORE submitting a proposal. All individuals coming to Argonne must register, receive a badge number, and receive access permission for arrival. You will receive a badge number by e-mail. To log on to the Online User Proposal System for the first time, enter your badge number and also use your badge

  5. Proposal Process in Brief | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process in Brief The international scientific community can perform research at the CNM through a general user access program. Proposals are submitted through a online proposal system. Proposals are peer-reviewed, rated, and time is allocated on the basis of these reviews by appropriate allocation committees. How to Submit a Proposal You must register online through the User Facility Registration System. Study the CNM Research Groups and identify the capabilities you plan to use. Consult the

  6. Proposal Writing Guidelines and Scoring Criteria

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Writing Guidelines and Scoring Criteria Print Principal Investigator The proposal form asks for the names and contact information of the experiment leader completing the form and the Principal Investigator (PI). The PI is the leader and the individual responsible for the group, and the experiment leader is often the person completing the proposal form. In this way the ALS would like to encourage postdocs and students to gain experience in submitting proposals as the experiment leader,

  7. 2013 INCITE Proposals due June 27

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INCITE Proposals 2013 INCITE Proposals due June 27 June 15, 2012 by Francesca Verdier The Innovative and Novel Computational Impact on Theory and Experiment (INCITE) program promotes transformational advances in science and technology through large allocations of computer time, supporting resources, and data storage at the Argonne and Oak Ridge Leadership Computing Facilities. 2013 proposals are due June 27. See 2013 INCITE Call for Proposals. Subscribe via RSS Subscribe Browse by Date January

  8. Return on investment (ROI) proposal preparation guide

    SciTech Connect (OSTI)

    VALERO, O.J.

    1998-10-09

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding.

  9. Evaluation and Selection of CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evaluating, Selecting Proposals Evaluation and Selection of CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email Geophysics W. Scott Baldridge (505) 667-4338 Email New student and postdoc proposals All new proposals undergo peer review by scientists in the broad research community who

  10. DOE Proposes Higher Efficiency Standards for Refrigerators

    Broader source: Energy.gov [DOE]

    New Proposed Standards for Residential Refrigerators and Freezers to Lower Energy Use by as much as Twenty-Five Percent

  11. Action South Facing | Open Energy Information

    Open Energy Info (EERE)

    search Name: Action South Facing Place: United Kingdom Zip: HP2 6HG Sector: Buildings Product: UK-based installer of grid-connected PV systems on commercial buildings in...

  12. Federal Actions to Address Impacts of Uranium

    Office of Legacy Management (LM)

    Federal Actions to Address Impacts of Uranium Contamination in the Navajo Nation 2014 Page | i TABLE OF CONTENTS Executive Summary ....................................................................................................................... 1 Introduction .................................................................................................................................... 2 Summary of Work Completed 2008-2012

  13. Green Building Action Plan for State Facilities

    Broader source: Energy.gov [DOE]

    On December 14, 2005, California’s governor signed Executive Order S-20-04, creating a Green Building Action Plan to improve the energy performance of all state buildings. The order established...

  14. International Program Action Table - October 2012 | Department of Energy

    Energy Savers [EERE]

    Communication & Engagement » International Programs » International Program Action Table - October 2012 International Program Action Table - October 2012 International Program Action Table - October 2012 PDF icon EM International Program Action Table - October 2012 More Documents & Publications EM International Program Action Table - June 2014 Across the Pond Newsletter Issue 4 Across the Pond Newsletter Issue 6

  15. EM International Program Action Table - June 2014 | Department of Energy

    Energy Savers [EERE]

    Action Table - June 2014 EM International Program Action Table - June 2014 EM International Program Action Table - June 2014 PDF icon EM International Program Action Table - June 2014 More Documents & Publications International Program Action Table - October 2012 Across the Pond Newsletter Issue 9 Across the Pond Newsletter Issue 3

  16. Easy Energy Action Plan Checklist | Department of Energy

    Office of Environmental Management (EM)

    Easy Energy Action Plan Checklist Easy Energy Action Plan Checklist 10 Simple Ways To Use Energy Wisely PDF icon EnergyActionChecklist_English.pdf PDF icon EnergyActionChecklist_Spanish.pdf More Documents & Publications Ahorre Energía Get Current: Switch on Clean Energy Activity Book Easy Energy Action Plan Checklist Conocimiento de Energia

  17. Microsoft Word - ProjectProposalForm.dotx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Form Center for Advanced Microstructures and Devices, Louisiana State University, 6980 Jefferson Hwy., Baton Rouge, LA 70806 1. Project Title: __________________________________________________________________________________________ Anticipated Completion Date:__________________ 2. Type of Proposal: ___ New Project ___ Renewal 3. Type of Project: ___ Single Experiment: 4 eight-hour shifts maximum. ___ Program (These proposals will be referred.) 4. P.I.:

  18. Research Proposal Milestones | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposal Milestones Research Proposal Milestones Research Proposal Milestones, from the U.S. Department of Energy's Postdoctoral Research Awards program. Office spreadsheet icon template_for_milestones.xls More Documents & Publications Template for Milestones ESPC ENABLE ACQUISITION PLAN TEMPLATE Dynamically Responsive Infrared Window Coatings

  19. CPR_RemedialAction_flowchart_final.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    characterize site STOP no further action needed No Yes Is development successful? 4b No Yes Is it appropriate to invest time and money in new treatment technologies? (consider risk) 4a Yes No Are treatment technologies available? 4 Yes No Are retrieval technologies available? 3 Yes No Does the waste site require action? (consider risk) 2 Has the waste site been adequately characterized? 1 Yes No Yes No Are disposal alternatives available? 5 Yes No Are retrieval, treatment and disposal

  20. Corrective Action Plan for Environmenta' Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corrective Action Plan for Environmenta' Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14~ 2014 Washington, DC 20585 August 2015 Corrective Action Plan for Environmental Management Headquarters Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant on February 14, 2014 Deputy Assistant Secretary for Safety, Security, and Quality Programs Environmental Management Approved by: Monica Regalbuto Assistant Secretary for

  1. Appendix IV Closed Corrective Action Units

    National Nuclear Security Administration (NNSA)

    IV Closed Corrective Action Units Revision No.: 26 July 2009 Federal Facility Agreement and Consent Order (FFACO) FFACO Appendix IV - Closed Corrective Action Units Owner: NNSA / Industrial Sites - DP CAU Number: 34 Area 3 Contaminated Waste Sites CAU Notice of Completion: 6/25/2002 Submitted as CADD/CR. CR regulatory milestone not established prior to CADD/CR submittal. CAS Number CAS Description Functional Category Map Name General Location Mud Pit Mud Disposal Crater Yucca Flat U-3ag at Mud

  2. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  3. EIS-0030-S: Bonneville Power Administration Proposed FY 1980 Program, Facility Location Supplement, Northwest Montana/North Idaho Support and Libby Integration, Supplemental

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this supplemental statement to evaluate the environmental impacts of proposed alternative actions to alternative actions intended to address the need for reliability of electrical service to loads in Northwest Montana and North Idaho and the need for integrating the generation being added at Libby Dam into the Federal Columbia River Power System.

  4. Environmental assessment of remedial action at the Mexican Hat uranium mill tailings site, Mexican Hat, Utah. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    This document assesses the environmental impacts of the proposed remedial action at the Mexican Hat uranium mill tailings site located on the Navajo Reservation in southern Utah. The site covers 235 acres and contains 69 acres of tailings and several of the original mill structures. Remedial action must be performed in accordance with standards and with the concurrence of the US Nuclear Regulatory Commission and the Navajo Nation. The proposed action is to stabilize the tailings within the present tailings site by consolidating the tailings and associated contaminated soils into a recontoured pile. A radon barrier of compacted earth would be constructed over the pile, and various erosion control measures would be taken to assure the long-term stability of the pile. The no action alternative is also assessed in this document. 240 refs., 12 figs., 20 tabs.

  5. Enforcement actions: Significant actions resolved material licensees. Semiannual progress report, July--December 1996

    SciTech Connect (OSTI)

    1997-04-01

    This compilation summarizes significant enforcement actions that have been resolved during the period and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  6. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  7. Tonopah Test Range Summary of Corrective Action Units

    SciTech Connect (OSTI)

    Ronald B. Jackson

    2007-05-01

    Corrective Action Sites (CASs) and Corrective Action Units (CAUs) at the Tonopah Test Range (TTR) may be placed into three categories: Clean Closure/No Further Action, Closure in Place, or Closure in Progress.

  8. FY 2016-2018 Action Agenda Framework Webinar | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FY 2016-2018 Action Agenda Framework Webinar FY 2016-2018 Action Agenda Framework Webinar Learn about the EJ IWG's Draft Action Agenda Framework. The Framework advances greater ...

  9. EIS-0473: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0473: Mitigation Action Plan W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This Mitigation Action Plan (MAP)...

  10. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    SciTech Connect (OSTI)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  11. The Climate Change Action Plan: Technical supplement

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Technical Annex documents the assumptions and parameters used in developing the supporting analysis for the Climate Change Action Plan (the Plan) issued by President Clinton on October 19, 1993. The Annex is intended to meet the needs of independent energy and environmental analysts who wish to better understand the Plan, its analytical underpinnings, and the events that need to transpire for the emissions reductions called for in the Plan to be realized. The Plan documented in this Annex reflects the outcome of a wide-ranging effort by Government agencies and interested members of the public to develop and implement actions that can reduce net greenhouse gas emissions in the year 2000 to their aggregate 1990 level. Based on agency and public input, the Climate Change Mitigation Group, chaired by the White House Office on Environmental Policy, developed the Plan`s content. Many of the actions called for in the Plan are now underway, while others are in advanced planning pending congressional action on the fiscal year 1995 budget. The analysis supporting the Plan represents the results of an interagency effort. The US Department of Energy (DOE) was responsible for the integrated analysis of energy-related options, based on the analysis of individual energy-related options by DOE, the US Environmental Protection Agency (EPA), and the US Department of Transportation (DOT). EPA led in providing analysis for actions related to methane, hydrofluorocarbons, and perfluorocarbons. The US Department of Agriculture (USDA) led the analysis of carbon sequestration actions and cooperated with EPA in the analysis of actions to reduce nitrous oxide emissions.

  12. EIS-0380: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    : Mitigation Action Plan EIS-0380: Mitigation Action Plan Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico PDF icon Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS-0380) Mitigation Action Plan (December 2008) More Documents & Publications EIS-0380: Annual Mitigation Action Plan Annual Report EIS-0380: Mitigation Action Plan Annual Report EIS-0380: Mitigation Action Plan

  13. Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information

    Open Energy Info (EERE)

    Mitigation Action Plans and Scenarios (MAPS) (Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) Jump to: navigation, search Retrieved from "http:...

  14. DOE SEE Action, "Behavior Change Strategies in Traditional Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEE Action, "Behavior Change Strategies in Traditional Energy Efficiency Programs" Webinar DOE SEE Action, "Behavior Change Strategies in Traditional Energy Efficiency Programs"...

  15. Tonopah Test Range Environmental Restoration Corrective Action Sites

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2010-08-04

    This report describes the status (closed, closed in place, or closure in progress) of the Corrective Action Sites and Corrective Action Units at the Tonopah Test Range

  16. Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) The purpose of...

  17. CHP: A Technical & Economic Compliance Strategy - SEE Action...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CHP: A Technical & Economic Compliance Strategy - SEE Action Webinar, January 2012 CHP: A Technical & Economic Compliance Strategy - SEE Action Webinar, January 2012 This ...

  18. LEDS Collaboration in Action Workshop Attendee List | Open Energy...

    Open Energy Info (EERE)

    LEDS Collaboration in Action Workshop Attendee List (Redirected from LEDS Collaboration in Action Workshop Participating Countries) Jump to: navigation, search Low Emission...

  19. San Antonio, Texas: Solar in Action (Brochure), Solar America...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Antonio, Texas: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Antonio, Texas: Solar in Action (Brochure), Solar America Cities, ...

  20. Los Alamos National Security Corrective Action Plan - Radiological...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos ...

  1. Policy and Procedures for the Review of Federal Actions Impacting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Procedures for the Review of Federal Actions Impacting the Environment Policy and Procedures for the Review of Federal Actions Impacting the Environment This manual...

  2. State Opportunities for Action: Update of States' CHP Activities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 State Opportunities for Action: Update of States' CHP Activities (ACEEE), October 2003 This 2003 ...

  3. Vietnam-Renewable Energy Action Plan | Open Energy Information

    Open Energy Info (EERE)

    Renewable Energy Action Plan Jump to: navigation, search Name Vietnam-Renewable Energy Action Plan AgencyCompany Organization World Bank Sector Energy Focus Area Renewable Energy...

  4. Seattle, Washington: Solar in Action (Brochure), Solar America...

    Office of Environmental Management (EM)

    Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America ...

  5. EAC Recommendations for DOE Action Regarding the Power Marketing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recommendations for DOE Action Regarding the Power Marketing Administrations - June 18, 2012 EAC Recommendations for DOE Action Regarding the Power Marketing Administrations - June ...

  6. San Francisco, California: Solar in Action (Brochure), Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Francisco, California: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) San Francisco, California: Solar in Action (Brochure), Solar...

  7. Portland, Oregon: Solar in Action (Brochure), Solar America Cities...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Portland, Oregon: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Portland, Oregon: Solar in Action (Brochure), Solar America Cities,...

  8. Ricardo's ACTION Strategy: An Enabling Light Duty Diesel Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ricardo's ACTION Strategy: An Enabling Light Duty Diesel Technology for the US Market Ricardo's ACTION Strategy: An Enabling Light Duty Diesel Technology for the US Market 2005 ...

  9. Energy Efficiency NAMAs and Actions | Open Energy Information

    Open Energy Info (EERE)

    NAMAs and Actions Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Efficiency NAMAs and Actions AgencyCompany Organization: United Nations Foundation Sector:...

  10. Policy and Procedures for the Review of Federal Actions Impacting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Actions Impacting the Environment (EPA, 1984) Policy and Procedures for the Review of Federal Actions Impacting the Environment (EPA, 1984) This manual establishes policies and ...

  11. Lessons Learned: Creating the Chicago Climate Action Plan | Open...

    Open Energy Info (EERE)

    Lessons Learned: Creating the Chicago Climate Action Plan Jump to: navigation, search Name Lessons Learned: Creating the Chicago Climate Action Plan AgencyCompany Organization...

  12. Microsoft Word - Actions to address lessons learned.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Actions to address Work Planning and Scheduling System lessons learned Action Executive owner Staff assigned Due date Understand the business environment of vendor references....

  13. Angola-Nationally Appropriate Mitigation Actions (NAMAs) in the...

    Open Energy Info (EERE)

    Angola-Nationally Appropriate Mitigation Actions (NAMAs) in the Congo Basin Jump to: navigation, search Name Angola-Nationally Appropriate Mitigation Actions (NAMAs) in the Congo...

  14. Chapter 5 - Publicizing Contract Actions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 - Publicizing Contract Actions Chapter 5 - Publicizing Contract Actions PDF icon Acquisition Guide Chapter 5.1 - Congressional Notifications - (May 2015) PDF icon...

  15. Energy Department Actions to Deploy Combined Heat and Power,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency Energy Department Actions to Deploy Combined Heat and Power, Boost Industrial Efficiency October 21, 2013 -...

  16. Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck...

    Broader source: Energy.gov (indexed) [DOE]

    Release Event Corrective Action Plan under Nuclear Waste Partnership LLC Contract DE-EM0001971. PDF icon Nuclear Waste Partnership (NWP) Corrective Action Plan - Truck ...

  17. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FLORIDA Department of Energy Office of Nuclear Energy Office of Remedial Action and ... Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and ...

  18. Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire and Radiological Release Carlsbad Field Office (CBFO) Corrective Action Plan - Truck Fire and Radiological Release...

  19. U.S. Mayor's Climate Protection Agreement: Climate Action Handbook...

    Open Energy Info (EERE)

    Action Handbook offers examples of actions that local governments can take to reduce global warming emissions and implement the commitments for climate protection called out...

  20. Burundi-National Adaptation Plan of Action to Climate Change...

    Open Energy Info (EERE)

    National Adaptation Plan of Action to Climate Change Jump to: navigation, search Name Burundi-National Adaptation Plan of Action to Climate Change AgencyCompany Organization...

  1. Ethiopia-Climate Change National Adaptation Programme of Action...

    Open Energy Info (EERE)

    Climate Change National Adaptation Programme of Action Jump to: navigation, search Name Ethiopia-Climate Change National Adaptation Programme of Action AgencyCompany Organization...

  2. Bangladesh Climate Change Strategy and Action Plan | Open Energy...

    Open Energy Info (EERE)

    Bangladesh Climate Change Strategy and Action Plan Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Bangladesh Climate Change Strategy and Action Plan AgencyCompany...

  3. India National Action Plan on Climate Change | Open Energy Information

    Open Energy Info (EERE)

    Action Plan on Climate Change Jump to: navigation, search Tool Summary LAUNCH TOOL Name: India National Action Plan on Climate Change AgencyCompany Organization: India Prime...

  4. Rwanda-National Adaptation Programs of Action to Climate Change...

    Open Energy Info (EERE)

    National Adaptation Programs of Action to Climate Change Jump to: navigation, search Name Rwanda-National Adaptation Programs of Action to Climate Change AgencyCompany...

  5. Indonesia National Action Plan Addressing Climate Change | Open...

    Open Energy Info (EERE)

    National Action Plan Addressing Climate Change Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Indonesia National Action Plan Addressing Climate Change AgencyCompany...

  6. EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual...

  7. EA-1706: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE...

  8. Corrective Action Tracking System User's Guide | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    September 07, 2004 Corrective Action Tracking System (CATS) User's Guide for Direct Web Access The Department of Energy (DOE) Corrective Action Management Program (CAMP) prescribes...

  9. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Savers [EERE]

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  10. Demand Response and Smart Metering Policy Actions Since the Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the ...

  11. EIS-0218: Mitigation Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan EIS-0218: Mitigation Action Plan Implementation of a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel The ...

  12. US-China Partnership for Climate Action | Open Energy Information

    Open Energy Info (EERE)

    US-China Partnership for Climate Action Jump to: navigation, search Name US-China Partnership for Climate Action AgencyCompany Organization Institute for Sustainable Communities...

  13. Orlando, Florida: Solar in Action (Brochure), Solar America Cities...

    Office of Environmental Management (EM)

    Orlando, Florida: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Orlando, Florida: Solar in Action (Brochure), Solar America Cities,...

  14. Denver, Colorado: Solar in Action (Brochure), Solar America Cities...

    Office of Environmental Management (EM)

    Denver, Colorado: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Denver, Colorado: Solar in Action (Brochure), Solar America Cities,...

  15. United States -Japan Joint Nuclear Energy Action Plan | Department...

    Office of Environmental Management (EM)

    -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan have both...

  16. One Year into President's Climate Action Plan, Finance Playing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    One Year into President's Climate Action Plan, Finance Playing an Important Role One Year into President's Climate Action Plan, Finance Playing an Important Role June 25, 2014 - ...

  17. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada

    Office of Legacy Management (LM)

    Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada Controlled Copy No.: Revision No.: 3 March 2006 Approved for public release; further dissemination unlimited. DOE/NV--1025--Rev. 3 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm

  18. Remedial action plan for stabilization of the inactive uranium mill tailings site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1986-02-01

    This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  19. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  20. EPA proposes to control automotive VOC emissions

    SciTech Connect (OSTI)

    Not Available

    1987-09-01

    US Environmental Protection Agency has proposed a vehicle control system for reducing gasoline vapors that can escape into the environment during refueling of motor vehicles. It has also has been proposed that gasoline refiners lower the volatility of commercial fuels in summer to reduce vehicle evaporative emissions. EPA said nationwide emissions of volatile organic compounds (VOC), a major contributor to the formation of urban ozone, could be reduced as much as 10% under the proposed pollution-control measures.

  1. Acceptance and Rejection of CSES Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accepting, Rejecting Proposals Acceptance and Rejection of CSES Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email Acceptance Final decisions on acceptance and/or rejection of all proposals are reached after each science discipline's review meeting, held right after the close of

  2. 2011 Call for Proposals for NERSC Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 2011 Call for Proposals for NERSC Resources The Office of Science of the U. S. Department of Energy (DOE) solicits proposals for allocations of high performance computing resources at the National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory. Proposals must support the mission of the Office of Science. All current 2010 NERSC projects (including startup and ALCC projects) must be renewed for 2011 in order to continue using NERSC. The deadline for

  3. 2012 Call for Proposals for NERSC Resources

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 2012 Call for Proposals for NERSC Resources The Office of Science of the U. S. Department of Energy (DOE) solicits proposals for allocations of high performance computing resources at the National Energy Research Scientific Computing Center (NERSC) at Lawrence Berkeley National Laboratory. Proposals must support the mission of the DOE Office of Science. All current 2011 NERSC projects (including startup, education, and ALCC projects) must be renewed for 2012 in order to continue using NERSC.

  4. Call issued for Proton Radiography Facility proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call issued for Proton Radiography Facility proposals Call issued for Proton Radiography Facility proposals The proposal deadline is Feb. 6 for experiments to be carried out during Fiscal Year 2016 (Oct. 1, 2015 to Sept. 30, 2016), with consideration for extensions into FY17. January 5, 2015 Amy Clarke and Seth Imhoff of Materials Technology-Metallurgy (MST-6) align a copper density calibration object for a proton radiography experiment. Amy Clarke and Seth Imhoff of Materials

  5. NREL: Request for Proposals (limited access)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requests for Proposals Printable Version RFP Number RXL-4-42118 Documentation Your company has been designated as a responder to a Request for Proposals (RFP) for the National Renewable Energy Laboratory (NREL), which is managed and operated by the Alliance for Sustainable Energy, LLC. The RFP is Number RXL-4-42118 entitled, "Commercial Building Partnerships Market Research Phase 2". This Web page gives you access to the documentation needed to complete your proposal, including the

  6. Request for Proposal Guidance | Department of Energy

    Energy Savers [EERE]

    Request for Proposal Guidance Request for Proposal Guidance When purchasing plug-in electric vehicle charging stations as part of your workplace charging program, your organization will want to consider issuing a Request for Proposal (RFP) to potential suppliers. This Guidance provides an explanation of the topics to cover in a workplace charging RFP. It is not intended to be a sample or manual for acquiring charging stations, but rather to serve as a reference for an employer. PDF icon Sample

  7. Duro Corporation: Proposed Penalty (2014-CE-23009)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Duro Corporation failed to certify cooking products as compliant with the applicable energy conservation standards.

  8. Perlick: Proposed Penalty (2013-SE-14002)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Perlick Corporation manufactured and distributed noncompliant refrigerator basic model HP48RR in the U.S.

  9. Viking Range: Proposed Penalty (2014-CE-23014)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Viking Range, LLC failed to certify cooking products as compliant with the applicable energy conservation standards.

  10. DHI: Proposed Penalty (2014-CE-32004)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that DHI Corp. failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  11. Harrington: Proposed Penalty (2014-SW-28011)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Harrington Brass Works manufactured and distributed noncompliant faucets in the U.S.

  12. Whirlpool: Proposed Penalty (2014-CE-21010)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Whirlpool Corporation failed to certify residential clothes dryers as compliant with the applicable energy conservation standards.

  13. American Range: Proposed Penalty (2014-CE-23006)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that American Range Corporation failed to certify cooking products as compliant with the applicable energy conservation standards.

  14. Ramblewood Green: Proposed Penalty (2014-CE-23017)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Ramblewood Green Ltd. failed to certify cooking products as compliant with the applicable energy conservation standards.

  15. Dacor: Proposed Penalty (2014-CE-23010)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Dacor failed to certify cooking products as compliant with the applicable energy conservation standards.

  16. Heat Controller: Proposed Penalty (2014-SE-15004)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Heat Controller, Inc. privately labeled and distributed noncompliant room air conditioners in the U.S.

  17. Nicor: Proposed Penalty (2014-CE-32016)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Nicor, Inc. failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  18. Electrolux: Proposed Penalty (2014-CE-23015)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Electrolux North America, Inc. failed to certify cooking products as compliant with the applicable energy conservation standards.

  19. Fisher & Paykel: Proposed Penalty (2014-CE-23012)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Fisher & Paykel Appliances, Inc. failed to certify cooking products as compliant with the applicable energy conservation standards.

  20. Kohler: Proposed Penalty (2014-CW-30003)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Kohler Co. failed to certify a variety of water closets as compliant with the applicable water conservation standards.

  1. Averen: Proposed Penalty (2010-CW-0711)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Averen, Inc. failed to certify a variety of faucets as compliant with the applicable water conservation standards.

  2. CE: Proposed Penalty (2013-SE-1429)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that CE North America, LLC, privately labeled and distributed noncompliant freezers in the U.S.

  3. Haier: Proposed Penalty (2011-SE-1408)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that Haier America Trading, L.L.C. privately labeled and distributed noncompliant freezers in the U.S.

  4. Evaluation and Selection of IGPPS Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for major challenges. 1.0 Serious deficiencies render the proposal uninteresting (innovation andor impact) or implausible (team or approach). A "0" is grounds for...

  5. Danby Products: Proposed Penalty (2012-CE-1415)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Danby Products, Inc. failed to certify refrigerators and freezers as compliant with the energy conservation standards.

  6. Lutron Electronics: Proposed Penalty (2012-SE-3796)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Lutron Electronics Co., Inc. manufactured and distributed noncompliant class A external power supplies in the U.S.

  7. Department of Energy Proposed Agency Information Collection:...

    Broader source: Energy.gov (indexed) [DOE]

    to OMB pursuant to the Paperwork Reduction Act of 1995. Federal Register Volume 75 No 100. Federal Register notice for the Department of Energy Proposed Agency Information...

  8. Department of Energy Proposed Agency Information Collection:...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy proposed Agency Information Collection: The Department of Energy (DOE) invites public comment on DOE's request to the Office of Management and Budget (OMB) to...

  9. Whirlpool: Proposed Penalty (2013-SE-1420)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Whirlpool Corporation manufactured and distributed noncompliant refrigerator-freezers in the U.S.

  10. Proposed Agency Information Collection: Federal Register Notice...

    Office of Environmental Management (EM)

    54 - Aug. 10, 2011 Proposed Agency Information Collection: Federal Register Notice Volume 76, No. 154 - Aug. 10, 2011 The Department of Energy (DOE) invites public comment on DOE's...

  11. Tips for Writing a Competitive User Proposal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    loosely related experiments in a single proposal Clearly articulate the science case: state the problem and its importance Place your research plan in the context of...

  12. Sunpentown: Proposed Penalty (2012-CE-1505)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Sunpentown International Inc. failed to certify dehumidifiers as compliant with the energy conservation standards.

  13. 2014 DOE ALCC Proposals Due February 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier DOE's 2014 call for its ASCR Leadership Computing Challenge (ALCC) competition is posted: http://science.energy.gov/ascr/facilities/alcc/. There are new guidelines this year: http://science.energy.gov/ascr/facilities/alcc/alcc-application-details/. Proposals for 2014 ALCC are due 11:59 PM EST February 3rd, 2014. Email your completed proposal to ALCC@science.doe.gov. PDF format is

  14. Research Subject Areas for IGPPS Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Subject Areas Research Subject Areas for IGPPS Proposals High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and...

  15. Hudson Reed: Proposed Penalty (2011-SW-2909)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Hudson Reed, Ltd. manufactured and distributed noncompliant showerheads in the U.S.

  16. Paragon Sales: Proposed Penalty (2012-CE-1417)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that Paragon Sales Co., Inc., failed to certify certain Liebherr residential freezers as compliant with the energy conservation standards.

  17. Almo: Proposed Penalty (2012-CE-1416)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Almo Corporation failed to certify residential refrigerators as compliant with the applicable energy conservation standards.

  18. Allen Co: Proposed Penalty (2010-CW-0715)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Allen Co. failed to certify a variety of faucets as compliant with the applicable water conservation standards.

  19. Review Policy / Proposal Guidelines / Reporting Requirements...

    Office of Science (SC) Website

    Review Policy Proposal Guidelines Reporting Requirements High Energy Physics (HEP) HEP ... Advisory Committees Community Resources Contact Information High Energy Physics U.S. ...

  20. Capital Cooking: Proposed Penalty (2014-CE-23008)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Capital Cooking Equipment, Inc. failed to certify cooking products as compliant with the applicable energy conservation standards.

  1. BPA proposes resolution to electricity oversupply

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Portland, Ore. - The Bonneville Power Administration today proposed compensating wind energy producers within its section of the grid for periodically reducing their output...

  2. Sears: Proposed Penalty (2012-CE-3606)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Sears, Roebuck & Co. failed to certify two dehumidifiers as compliant with the applicable energy conservation standards.

  3. Royal Centurion: Proposed Penalty (2012-CE-3608)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Royal Centurion, Inc., failed to certify two dehumidifiers as compliant with the energy conservation standards.

  4. Universal: Proposed Penalty (2013-SE-26004)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Universal Lighting Technologies, Inc. manufactured and distributed noncompliant fluorescent lamp ballasts in the U.S.

  5. ET Industries: Proposed Penalty (2012-SE-2902)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that ET Industries, Inc. manufactured and distributed noncompliant showerheads in the U.S.

  6. Acme Kitchenettes: Proposed Penalty (2011-CE-1406)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Acme Kitchenettes Corp. failed to certify a variety of refrigerators as compliant with the applicable energy conservation standards.

  7. BPA proposes rate increase to bolster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    proposed a 9.6 percent average wholesale power rate increase to compensate for reduced revenue expectations from surplus power sales and to continue funding needed investments in...

  8. Basement Systems: Proposed Penalty (2010-CE-2110)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Basement Systems, Inc. failed to certify a variety of dehumidifier as compliant with the applicable energy conservation standards.

  9. Distinctive Appliances: Proposed Penalty (2014-CE-23020)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Distinctive Appliances Distributing Inc. failed to certify cooking products as compliant with the applicable energy conservation standards.

  10. Energy Department Requests Proposals for Advanced Scientific...

    Office of Science (SC) Website

    Energy Department Requests Proposals for Advanced Scientific Computing Research News News ... Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW ...

  11. University Park “STEP-UP” Proposal

    Broader source: Energy.gov [DOE]

    University Park “STEP-UP” Proposal: DE-FOA-0000148, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  12. Quietside Corp: Proposed Penalty (2010-CE-1710)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Quietside Corporation failed to certify a variety of water heaters as compliant with the applicable energy conservation standards.

  13. American Valve: Proposed Penalty (2010-CW-1411)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that American Valve, Inc. failed to certify a variety of showerheads as compliant with the applicable water conservation standards.

  14. Engineered Solutions: Proposed Penalty (2010-CE-2112)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Engineered Solutions, Inc. failed to certify a dehumidifier as compliant with the applicable energy conservation standards.

  15. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  16. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation activities. (11) CAS 23-60-01, Mud Trap Drain and Outfall, will be clean closed by removing sediment from the mud trap. As a BMP, the mud trap and outfall pipe will be removed. (12) CAS 23-99-06, Grease Trap, will be clean closed by removing sediment from the grease trap and backfilling the grease trap with grout. (13) CAS 25-60-04, Building 3123 Outfalls, will be clean closed by removing contaminated soil and the sludge-containing outfall pipe.

  17. Remedial action planning for Trench 1

    SciTech Connect (OSTI)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  18. Rem&al Action Performed

    Office of Legacy Management (LM)

    Rem&al Action Performed at the B&T Metals Site in * Columbus, Ohio Department of Energy Office of Assistant Manager for Environmenta/ Management Oak Ridge Operations June 2007 Printed on recycled/recyclable paper. 1.41 2503.2 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PER-FORMED AT THE B&T METALS SITE IN COLUMBUS, OHIO JUNE 200 1 Prepared for United States Department of Energy Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501

  19. Environmental Effects Abroad of Major Federal Actions

    Office of Environmental Management (EM)

    44-NO. 62 3-29-79 PAGES 18633-18921 E THURSDAY, MARCH 29, 1979 € 18722 NOTICES [ 31 25-01-MI COUNCIL ON ENVIRONMENTAL QUALITY 'ENVIRONMENTAL EFFECTS ABROAD OF MAJOR FEDERAL ACTIONS Executive Order 12144; Implementing and Explanotory Documents MARCH 21, 1979. AGENCY: Council on Environmental Quality, Executive Office of t h e F'resi- dent. ACTION: Information Only: Publica- tion of Implementing Documents Con- cerning Executive Order 12114. SUMMARY: O n January 4, 1979, t h e President signed

  20. National Energy Action Month | Department of Energy

    Office of Environmental Management (EM)

    Month National Energy Action Month October 5, 2012 - 12:24pm Addthis Learn about the President's all-of-the-above energy plan. Matt Compton Deputy Director of Online Content for the Office of Digital Strategy at the White House. Editor's note: This article has been cross-posted from WhiteHouse.gov. October is National Energy Action Month, when Americans are called up to work together, "to achieve greater energy security, a more robust economy, and a healthier environment for our

  1. Letter: The Proposed Plan for Remedial Action at the Quarry Residuals Operable Unit of the WSS dated January 8, 1998

    Office of Legacy Management (LM)

  2. Notice: DOE Announces the Proposed Plan for Remdial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site.

    Office of Legacy Management (LM)

  3. Notice: DOE Announces the Proposed Plan for Remdial Action at the Quarry Residuals Operable Unit of the Weldon Spring Site.

    Office of Legacy Management (LM)

  4. Proposed Interim Response Action Number 3, Material Staging Area, Revision 0. DOE/OR/21548-032.

    Office of Legacy Management (LM)

  5. Proposed Interim Response Action Number 3, Material Staging Area, Revision 0. IR-1300-1303-1.02.

    Office of Legacy Management (LM)

  6. Finding of No Significant Impact, proposed remediation of the Maybell Uranium Mill Processing Site, Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1995-12-31

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0347) on the proposed surface remediation of the Maybell uranium mill processing site in Moffat County, Colorado. The mill site contains radioactively contaminated materials from processing uranium ore that would be stabilized in place at the existing tailings pile location. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, Public Law 91-190 (42 U.S.C. {section}4321 et seq.), as amended. Therefore, preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  7. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

    SciTech Connect (OSTI)

    Irene Farnham and Sam Marutzky

    2011-07-01

    This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flat CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).

  8. PIA - Correspondence and Action Tracking System (CATS) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Correspondence and Action Tracking System (CATS) PIA - Correspondence and Action Tracking System (CATS) PIA - Correspondence and Action Tracking System (CATS) PDF icon PIA - Correspondence and Action Tracking System (CATS) More Documents & Publications PIA - GovTrip (DOE data)

  9. PIA - Savannah River Operations Office Executive Commitment Action Tracking

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System | Department of Energy Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PDF icon PIA - Savannah River Operations Office Executive Commitment Action Tracking System More Documents & Publications PIA - GovTrip (DOE data) PIA - Bonneville Power Adminstration Ethics Helpline

  10. Earned Value Management System (EVMS) Corrective Action Standard Operating

    Office of Environmental Management (EM)

    Procedure | Department of Energy Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as PM's primary reference for development of Corrective Action Requests (CARs) and Continuous Improvement Opportunities (CIOs), as well as the assessment of contractors procedures and implementation associated with

  11. FTCP Corrective Action Plan- Revision 1

    Broader source: Energy.gov [DOE]

    January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

  12. White House Highlights Climate Action Champions' Achievements

    Broader source: Energy.gov [DOE]

    After a competitive application process, the Department of Energy designated 16 communities as Climate Action Champions, including two tribes: the Sault Ste. Marie Tribe of Chippewa Indians (Michigan) and the Blue Lake Rancheria Tribe (California). These tribes were selected for their local leadership in climate mitigation and adaptation.

  13. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Hill, T.V.; Morley, J.A. . Uranium Mill Tailings Remedial Action Project Office); Began, E.T. )

    1985-06-01

    This Remedial Action Plan (RAP) has been developed to serve a twofold purpose. It presents the series of activities which are proposed by the Department of Energy (DOE) to effect long-term control of radioactive materials at the inactive uranium processing site located on the Navajo Reservation at Shiprock, New Mexico. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Shiprock site. Detailed supporting information can be found in appendices and referenced documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 traces the history of operations at the Shiprock site with a description of the present site characteristics. Section 4.0 provides a definition of site-specific problems, a listing of remedial action alternatives which have been considered, and the action which is being proposed. Section 5.0 presents a summary of the conceptual design for the proposed action which includes objectives, design features, schedule, cost, and implementation methods. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the onsite workers. Section 7.0 presents a detailed listing of the responsibilities of the project participants. Section 8.0 describes the quality assurance process that will be used by the RAC during construction. Section 9.0 describes the features of the long-term maintenance and surveillance plan. Section 10.0 documents the on-going activities to keep the public informed and participating in the project. Attached as part of the RAP are five appendices which describe in more detail various aspects of the remedial action.

  14. DOE/EA-1976 FINDING OF NO SIGNIFICANT IMPACT FOR PROPOSED CNG PROJECT REGARDING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE/EA-1976 FINDING OF NO SIGNIFICANT IMPACT FOR PROPOSED CNG PROJECT REGARDING EMERA CNG, LLC APPLICATION SEEKING DEPARTMENT OF ENERGY AUTHORIZATION TO EXPORT COMPRESSED NATURAL GAS TO NON-FREE TRADE AGREEMENT NATIONS AGENCY: U.S. Department of Energy, Office of Fossil Energy ACTION: Finding of No Significant Impact SUMMARY: The U.S. Department of Energy (DOE) prepared an environmental assessment (EA) to evaluate the potential environmental impacts associated with the construction and operation

  15. Microsoft PowerPoint - 2011_1206_Engstrom_ProposedPlanAlts100-K.pptx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PROPOSED PLAN FOR REMEDIATION OF 100-KR-, KR-2 AND KR-4 OPERABLE UNITS UNITS A brief comparison of the two 100-K Remediation Alternatives (not counting the "No Action" Alternative) How do they compare for implementability? For remediation effectiveness? For Protectiveness? For Cost? For Cost? Other Technologies: Bio-Injection needs lab testing Bio-infiltration Chromium trial at Hanford Bio-infiltration Chromium trial at Hanford Bio-venting needs testing Soil Flushing (C-14) needs lab

  16. Proposed Rules DEPARTMENT OF ENERGY 10 CFR Chapters II, III, and X

    Energy Savers [EERE]

    646 Federal Register / Vol. 76, No. 132 / Monday, July 11, 2011 / Proposed Rules DEPARTMENT OF ENERGY 10 CFR Chapters II, III, and X Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of availability; request for comment. SUMMARY: Through this notice, the Department of Energy (DOE) announces the availability of its preliminary plan for retrospective analysis of existing rules to make

  17. DOE/EA-1976 FINDING OF NO SIGNIFICANT IMPACT FOR PROPOSED CNG PROJECT REGARDING

    Office of Environmental Management (EM)

    DOE/EA-1976 FINDING OF NO SIGNIFICANT IMPACT FOR PROPOSED CNG PROJECT REGARDING EMERA CNG, LLC APPLICATION SEEKING DEPARTMENT OF ENERGY AUTHORIZATION TO EXPORT COMPRESSED NATURAL GAS TO NON-FREE TRADE AGREEMENT NATIONS AGENCY: U.S. Department of Energy, Office of Fossil Energy ACTION: Finding of No Significant Impact SUMMARY: The U.S. Department of Energy (DOE) prepared an environmental assessment (EA) to evaluate the potential environmental impacts associated with the construction and operation

  18. FPCC 03 proposed workplan/budget

    Office of Environmental Management (EM)

    May 29, 2012 U.S. Department of Energy Office of the General Counsel 1000 Independence Avenue SW., Room 6A245 Washington, DC 20585 Re: Regulatory Burden RFI Dear Sir or Madam: The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy actions. Our coalition is comprised of many of the world's leading Energy Service Companies (ESCOs), including twelve of the

  19. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  20. Action plan for the Tiger Team assessment report

    SciTech Connect (OSTI)

    Not Available

    1990-08-30

    This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

  1. Los Alamos National Security Corrective Action Plan - Radiological Release

    Energy Savers [EERE]

    Phase II | Department of Energy Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II Los Alamos National Security Corrective Action Plan - Radiological Release Phase II PDF icon Los Alamos National Security Corrective Action Plan - Radiological Release Phase II More Documents & Publications Environmental Management Los Alamos Field Office Corrective Action Plan -

  2. POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for Details |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Processing Personnel Actions for Details POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for Details The Office of Personnel Management (OPM), effective September 12, 2010, requires agencies to officially document detail actions. As a result, all Servicing Human Resources Offices (SHROs) are now required to document, process, and file certain specific detail actions in CHRIS. PDF icon POLICY GUIDANCE MEMORANDUM #15 Processing Personnel Actions for Details

  3. FTCP Corrective Action Plan - Revision 2 | Department of Energy

    Office of Environmental Management (EM)

    Corrective Action Plan - Revision 2 FTCP Corrective Action Plan - Revision 2 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations PDF icon FTCP Corrective Action Plan Revision 2 More Documents & Publications FTCP Corrective Action

  4. Institutional Change Process Step 4: Implement an Action Plan | Department

    Office of Environmental Management (EM)

    of Energy 4: Implement an Action Plan Institutional Change Process Step 4: Implement an Action Plan Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Process for Continuous Change Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground

  5. EIS-0026: Mitigation Action Plan | Department of Energy

    Office of Environmental Management (EM)

    Mitigation Action Plan EIS-0026: Mitigation Action Plan Waste Isolation Pilot Plant This MAP focuses on mitigation commitments stated in the RODs to the 1980 Final Environmental Impact Statement (FEIS) and the 1990 Final Supplement Environmental Impact Statement (SEIS). Specific commitments and mitigation implementation actions are listed in Table 1 of the Mitigation Action Plan. The comprehensive listing, presented in Table 1 of the Mitigation Action Plan, is the central focus of this MAP and

  6. Technology Commercialization Fund Laboratory Call for Proposals

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Technology Commercialization Fund Laboratory Call for Proposals Fiscal Year 2016 Office of Technology Transitions Key Dates Laboratory Call Issue Date February 4, 2016 Laboratory POC Registration (See Section V) February 9 at 5:00 p.m. (ET) Informational Webinar February 11 and February 17 at 3:30 p.m. (ET) Submission Deadline for Proposals March 31, 2016 11:00 p.m. (ET) Expected Date for Selection Notifications June 2016 Summary Information Means of Submission Proposals must be submitted by

  7. Draft Supplement Analysis: Two Proposed Shipments of Commercial Spent Nuclear Fuel to Idaho National Laboratory for Research and Development Purposes

    Broader source: Energy.gov [DOE]

    DOE is proposing to transport, in two separate truck shipments, small quantities of commercial power spent nuclear fuel (SNF) to the Idaho National Laboratory (INL) Site for research purposes consistent with the mission of the DOE Office of Nuclear Energy. DOE is preparing a Supplement Analysis to determine whether an existing environmental impact statement should be supplemented, a new environmental impact statement should be prepared, or that no further NEPA documentation is required for this proposed action.

  8. Dade Engineering: Proposed Penalty (2013-CE-5316)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Dade Engineering Corp. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

  9. Quorum: Proposed Penalty (2014-CE-32013)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Davoil, Inc. d/b/a Quorum International, Inc. failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  10. Smeg: Proposed Penalty (2014-CE-23003)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Smeg USA Inc. failed to certify various basic models of refrigerators/refrigerator-freezers/freezers, dishwashers, and cooking products as compliant with the applicable energy conservation standards.

  11. LG: Proposed Penalty (2014-SE-15011)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that LG Electronics USA, Inc. manufactured and distributed noncompliant room air conditioner basic model LT143CNR in the U.S.

  12. Legacy: Proposed Penalty (2015-CE-14025)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that The Legacy Companies failed to certify refrigerator Maxx Ice-brand basic model MCR3U as compliant with the applicable energy conservation standards.

  13. LG: Proposed Penalty (2015-CE-14022)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that LG Electronics USA, Inc. failed to certify various refrigerator-freezer basic models as compliant with the applicable energy conservation standards.

  14. Emerson: Proposed Penalty (2014-CE-54001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Emerson Electric Co. failed to certify a variety of metal halide lamp fixtures as compliant with the applicable energy conservation standards.

  15. MC Appliance: Proposed Penalty (2014-CE-20002)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that MC Appliance Corporation failed to certify residential clothes washers and residential clothes dryers as compliant with the applicable energy conservation standards.

  16. Cal Flame: Proposed Penalty (2015-CE-14015)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Cal Flame failed to certify refrigerator basic model BBQ09849P-H as compliant with the applicable energy conservation standards.

  17. Sylvane: Proposed Penalty (2013-CE-36005)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Sylvane, Inc. failed to certify at least two dehumidifier basic models as compliant with the applicable energy conservation standards.

  18. Electrolux: Proposed Penalty (2015-CE-14020)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Electrolux North America, Inc. failed to certify various refrigerator-freezers as compliant with the applicable energy conservation standards.

  19. Northland: Proposed Penalty (2014-CE-23002)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Northland Corporation d/b/a AGA Marvel failed to certify cooking products as compliant with the applicable energy conservation standards.

  20. Bigwall: Proposed Penalty (2014-SE-15006)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Bigwall Enterprises, Inc. privately labeled and distributed noncompliant PerfectAire brand room air conditioner model PACH8000 in the U.S.

  1. Hunter Fan: Proposed Penalty (2014-CE-32008)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Hunter Fan Company failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  2. Nostalgia Products: Proposed Penalty (2014-CE-14017)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Nostalgia Products Group, LLC failed to certify a variety of consumer refrigerators and refrigerator-freezers as compliant with the applicable energy conservation standards.

  3. Kichler: Proposed Penalty (2014-CE-32007)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that The L.D. Kiebler Co. d/b/a Kichler Lighting failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  4. Fagor America: Proposed Penalty (2014-CE-23018)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Fagor America, Inc. failed to certify various basic models of cooking products as compliant with the applicable energy conservation standards.

  5. Mile High: Proposed Penalty (2012-SE-4501)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Mile High Equipment, LLC manufactured and distributed noncompliant Ice-O-Matic brand automatic commercial ice maker basic model ICE2106 FW, HW in the U.S.

  6. Versonel: Proposed Penalty (2014-CE-21009)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Smart Surplus, Inc. d/b/a Versonel failed to certify refrigerators and residential clothes dryers as compliant with the applicable energy conservation standards.

  7. Golden Opportunity: Proposed Penalty (2014-CE-20003)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Golden Opportunity, Inc. failed to certify room air conditioners, central air conditioners/heat pumps, and residential clothes washers as compliant with the applicable energy conservation standards.

  8. Vaxcel: Proposed Penalty (2014-CE-32006)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Vaxcel International Co., Ltd. failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  9. Yosemite: Proposed Penalty (2014-CE-32015)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Northern Central Distributing, Inc. d/b/a Yosemite Home Décor failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  10. Home Depot: Proposed Penalty (2014-CE-32017)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that The Home Depot, Inc. failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  11. Midea: Proposed Penalty (2013-SE-1505)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that GD Midea Air-Conditioning Equipment Co. Ltd. manufactured and distributed noncompliant room air conditioner basic model MWJ1-08ERN1-BI8 in the U.S.

  12. Airwell Group: Proposed Penalty (2011-CE-1505)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that Airwell Group failed to certify a variety of Fedders brand room air conditioners as compliant with the applicable energy conservation standards.

  13. Jamison Door: Proposed Penalty (2013-CE-5348)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Jamison Door Company failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  14. Trastar: Proposed Penalty (2013-CE-49003)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Trastar Inc. failed to certify a variety of basic models of traffic signal modules and pedestrian models as compliant with the applicable energy conservation standards.

  15. Goodman: Proposed Penalty (2012-CE-1509)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Goodman Manufacturing Company, L.P., failed to certify a various room air conditioners as compliant with the applicable energy conservation standards.

  16. Central Moloney: Proposed Penalty (2013-SE-4702)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Central Moloney, Inc. manufactured and distributed a variety of noncompliant liquid-immersed distribution transformers in the U.S.

  17. Cospolich Refrigerator: Proposed Penalty (2013-CE-5314)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Cospolich Refrigerator Co, Inc. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

  18. Manitowoc Foodservice: Proposed Penalty (2012-CE-5309)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Manitowoc Foodservice failed to certify various walk-in coolers and freezers (WICFs) and their components as compliant with the applicable energy conservation standards.

  19. Amerikooler: Proposed Penalty (2013-CE-5307)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Amerikooler, Inc. failed to certify walk-in cooler or freezer (WICF) components as compliant with the energy conservation standards.

  20. Southeast Cooler: Proposed Penalty (2013-CE-5331)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Southeast Cooler Corp. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

  1. Aircooler: Proposed Penalty (2013-CE-5338)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Aircooler Corporation failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  2. Stiebel Eltron: Proposed Penalty (2010-CE-1711)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Stiebel Eltron, Inc. failed to certify a variety of water heaters as compliant with the applicable energy conservation standards.

  3. Avanti: Proposed Penalty (2013-CE-2105)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that Avanti Products, LLC, failed to certify a variety of residential clothes dryers as compliant with the applicable energy conservation standards.

  4. Artisan Manufacturing: Proposed Penalty (2010-CW-0712)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Artisan Manufacturing Company, Inc. failed to certify a variety of faucets as compliant with the applicable water conservation standards.

  5. Polar King: Proposed Penalty (2013-CE-5328)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Polar King International Inc. failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  6. American Standard: Proposed Penalty (2013-CW-3001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that AS America, Inc., d/b/a American Standard Brands failed to certify a variety of water closets as compliant with the applicable water conservation standards.

  7. CNA: Proposed Penalty (2013-SE-1430)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that CNA International, Inc., d/b/a MC Appliance Corp. privately labeled and distributed noncompliant freezer Magic Chef model number HMCF7W in the U.S.

  8. Philips: Proposed Penalty (2012-SE-2605)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Philips Lighting Electronics N. A. manufactured and distributed noncompliant fluorescent lamp ballast basic model VEL-1S40-SC in the U.S.

  9. Leer: Proposed Penalty (2013-CE-5325)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Leer, Inc. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

  10. USA Manufacturing: Proposed Penalty (2013-CE-5336)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that USA Manufacturing failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

  11. Litex: Proposed Penalty (2014-CE-32011)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Litex Industries, Limited failed to certify a variety of celing fans as compliant with the applicable energy conservation standards.

  12. Barclay Products: Proposed Penalty (2013-CW-3005)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Barclay Products, Ltd. failed to certify a variety of water closets as compliant with the applicable water conservation standards.

  13. Absocold: Proposed Penalty (2010-CE-1212)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Absocold Corporation failed to certify a variety of residential refrigerators, freezers, and refrigerator-freezers as compliant with the applicable energy conservation standards.

  14. Watermark: Proposed Penalty (2011-SW-2908)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Watermark Designs, Ltd. manufactured and distributed noncompliant showerhead basic model SH-FAL90 in the U.S.

  15. Imperial Manufacturing: Proposed Penalty (2013-CE-5322)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Imperial Manufacturing, Inc. failed to certify walk-in cooler or freezer components as compliant with the energy conservation standards.

  16. Curtis: Proposed Penalty (2015-CE-14021)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Curtis International, Ltd. failed to certify the Igloo-brand refrigerator-freezer basic model FR9211 as compliant with the applicable energy conservation standards.

  17. Navien America: Proposed Penalty (2010-CE-1712)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE alleged in a Notice of Proposed Civil Penalty that Navien America, Inc. failed to certify a variety of water heaters as compliant with the applicable energy conservation standards.

  18. Hayward Industries: Proposed Penalty (2010-CE-1110)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Hayward Industries, Inc. failed to certify a variety of pool heaters as compliant with the applicable energy conservation standards.

  19. American Power: Proposed Penalty (2010-CE-0911)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that American Power Solutions, Inc. failed to certify a general service fluorescent lamp as compliant with the applicable energy conservation standards.

  20. Golden Cooler: Proposed Penalty (2013-CE-5345)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Golden Cooler failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  1. Fagor America: Proposed Penalty (2013-CEW-19001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Fagor America, Inc. failed to certify a variety of residential refrigerator-freezers and dishwashers as compliant with the applicable energy and water conservation standards.

  2. MC Appliance: Proposed Penalty (2012-CE-1508)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that CNA International Inc. d/b/a MC Appliance Corporation failed to certify a variety of room air conditioners as compliant with the applicable energy conservation standards.

  3. Maxx: Proposed Penalty (2012-SE-4506)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Maxx Cold Food Service manufactured and distributed a noncompliant Maxx Ice brand automatic commercial ice maker basic model MIM450 in the U.S.

  4. Penguin Toilets: Proposed Penalty (2010-CW-1615)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Penguin Toilets, LLC failed to certify a variety of water closets as compliant with the applicable water conservation standards.

  5. BSH: Proposed Penalty (2013-CE-2001)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that BSH Home Appliances Corp. failed to certify a variety of residential clothes washers as compliant with the applicable energy/water conservation standards.

  6. Watermark Designs: Proposed Penalty (2010-CW-1404)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Watermark Designs Holdings, Ltd. d/b/a/ Watermark Designs, Ltd. failed to certify various showerheads as compliant with the applicable water conservation standards.

  7. Mackle Company: Proposed Penalty (2011-CE-2102)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that The Mackle Company, Inc. failed to certify a variety of residential clothes dryers as compliant with the applicable energy conservation standards.

  8. Field Work Proposal (FWP) | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Field Work Proposal (FWP) Version Number: 5.0 Document Number: Form 58100.007 Effective Date: 01/2016 File (public): Microsoft Office document icon form_58100.007_rev5.doc

  9. Thermo Products: Proposed Penalty (2011-SE-1603)

    Broader source: Energy.gov [DOE]

    DOE issued this Notice of Proposed Civil Penalty Notice to Thermo Products, LLC, alleging that the company certified several models of residential air conditioning heat pumps without performing testing required by DOE regulations.

  10. AGA Marvel: Proposed Penalty (2011-CE-1905)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that AGA Marvel (also AGA Heartland and Northland Corp.) failed to certify a variety of dishwashers as compliant with the applicable energy conservation standards.

  11. Satco: Proposed Penalty (2013-CE-2702)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Satco Products, Inc. failed to certify a variety of general service fluorescent lamps as compliant with the applicable energy conservation standards.

  12. Anthony International: Proposed Penalty (2013-CE-5357)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Anthony International failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  13. Royal Pacific: Proposed Penalty (2013-SE-33004)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Royal Pacific, Ltd. failed to certify ceiling fans, ceiling fan light kits, medium base compact fluorescent lamps, and illuminated exit signs as compliant with the applicable energy conservation standards.

  14. Refrigerator Manufacturers: Proposed Penalty (2013-CE-5341)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Refrigerator Manufacturers, LLC failed to certify a variety of walk-in cooler or freezer components as compliant with the applicable energy conservation standards.

  15. Winix: Proposed Penalty (2012-CE-3607)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Cloud 9 Marketing, Inc. d/b/a Winix, Inc. failed to certify dehumidifiers as compliant with the applicable energy conservation standards.

  16. Model Investment Grade Audit and Project Proposal

    Broader source: Energy.gov [DOE]

    Information and documents for conducting an investment grade audit to evaluate potential measures and presenting a project proposal for a set of bundled measures that deliver savings to pay for the project over the finance term.

  17. Leotek: Proposed Penalty (2013-CE-4903)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Leotek Electronics USA Corp. failed to certify a variety of traffic signal modules and pedestrian modules as compliant with the applicable energy conservation standards.

  18. AM Conservation: Proposed Penalty (2010-CW-1415)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that AM Conservation Group, Inc. failed to certify a variety of showerheads as compliant with the applicable water conservation standards.

  19. Hicon: Proposed Penalty (2013-SE-1426)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Ningbo Hicon International Industry Company, Ltd. manufactured and distributed noncompliant freezer basic model BD-200 in the U.S.

  20. WASTE AREA GROUP 7 PROPOSED PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AREA GROUP 7 PROPOSED PLAN The Idaho National Laboratory (INL) Citizens Advisory Board (CAB) has provided its input to the Department of Energy on the Waste Area Group 7 (WAG 7)...