National Library of Energy BETA

Sample records for terminal box fans

  1. Review of Literature on Terminal Box Control, Occupancy Sensing Technology and Multi-zone Demand Control Ventilation (DCV)

    SciTech Connect (OSTI)

    Liu, Guopeng; Dasu, Aravind R.; Zhang, Jian

    2012-03-01

    This report presents an overall review of the standard requirement, the terminal box control, occupancy sensing technology and DCV. There is system-specific guidance for single-zone systems, but DCV application guidance for multi-zone variable air volume (VAV) systems is not available. No real-world implementation case studies have been found using the CO2-based DCV. The review results also show that the constant minimum air flow set point causes excessive fan power consumption and potential simultaneous heating and cooling. Occupancy-based control (OBC) is needed for the terminal box in order to achieve deep energy savings. Key to OBC is a technology for sensing the actual occupancy of the zone served in real time. Several technologies show promise, but none currently fully meets the need with adequate accuracy and sufficiently low cost.

  2. Final Project Report: Self-Correcting Controls for VAV System Faults Filter/Fan/Coil and VAV Box Sections

    SciTech Connect (OSTI)

    Brambley, Michael R.; Fernandez, Nicholas; Wang, Weimin; Cort, Katherine A.; Cho, Heejin; Ngo, Hung; Goddard, James K.

    2011-05-01

    This report addresses original research by the Pacific Northwest National Laboratory for the California Institute for Energy and Environment on self-correcting controls for variable-air-volume (VAV) heating, ventilating and air-conditioning systems and focuses specifically on air handling and VAV box components of the air side of the system. A complete set of faults for these components was compiled and a fault mode analysis performed to understand the detectable symptoms of the faults and the chain of causation. A set of 26 algorithms was developed to facilitate the automatic correction of these faults in typical commercial VAV systems. These algorithms include training tests that are used during commissioning to develop models of normal system operation, passive diagnostics used to detect the symptoms of faults, proactive diagnostics used to diagnose the cause of a fault, and finally fault correction algorithms. Ten of the twenty six algorithms were implemented in a prototype software package that interfaces with a test bed facility at PNNL's Richland, WA, laboratory. Measurement bias faults were instigated in the supply-air temperature sensor and the supply-air flow meter to test the algorithms developed. The algorithms as implemented in the laboratory software correctly detected, diagnosed and corrected these faults. Finally, an economic and impact assessment was performed for the State of California for deployment of self-correcting controls. Assuming 15% HVAC energy savings and a modeled deployment profile, 3.1-5.8 TBu of energy savings are possible by year 15.

  3. Composite fan blade

    SciTech Connect (OSTI)

    Farr, J.D.

    1993-08-31

    A composite fan blade is described for a prop fan engine comprising: a support disk having a plurality of hinge lugs formed therein, the disk being connected to an engine drive means; a bushing element; a fan blade formed from a first set of radially oriented unidirectional layers of fibers, the first set of layers of fibers being wrapped around the bushing element to form an elongated front side, an elongated back side, and a portion encompassing the bushing element; a blade platform formed from a second set of unidirectional layers of fibers having a first and a second end which are both wrapped around respective resin filler elements to form resin filled support pockets, the second set of unidirectional layers of fibers being wrapped around the portion of the fan blade encompassing the bushing element to place the resin filled support pockets against the portion of the fan blade encompassing the bushing element, wherein the fan blade and the blade platform form a fan blade assembly, the fan blade assembly having a plurality of hinge slots formed therein; and a pin element extending through the hinge formed by the plurality of hinge lugs in the support disk and the plurality of hinge slots in the fan blade assembly for attaching the fan blade assembly to the support disk.

  4. Record of Communication Concerning Ceiling Fan and Ceiling Fan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Record of Communication Concerning Ceiling Fan and Ceiling Fan Light Kit Framework Document-Docket No. EERE-2012-BT-STD-0045 Record of Communication Concerning Ceiling Fan and ...

  5. Sampling box

    DOE Patents [OSTI]

    Phillips, Terrance D.; Johnson, Craig

    2000-01-01

    An air sampling box that uses a slidable filter tray and a removable filter cartridge to allow for the easy replacement of a filter which catches radioactive particles is disclosed.

  6. Fan Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fan Systems Fan Systems Dramatic energy and cost savings can be achieved in motor systems by applying best energy management practices and purchasing energy-efficiency equipment. Use the software tools, training, and publications listed below to save energy in fan systems. Fan Tools Tools to Assess Your Energy System Fan System Assessment Tool (FSAT) Qualified Specialists Qualified Specialists have passed a rigorous competency examination on a specific industrial system assessment tool. Locate a

  7. Smart Fan Modules And System

    DOE Patents [OSTI]

    Cipolla, Thomas M.; Kaufman, Richard I.; Mok, Lawrence S.

    2003-07-15

    A fan module including: two or more individual fans, each fan having an air movement means and a motor engaged with the air movement means for accelerating air entering each of the two or more individual fans; a temperature sensor for sensing a temperature associated with the two or more fans and for outputting a first signal corresponding to the temperature; rotational speed sensor for outputting a second signal corresponding to a rotational speed of each of the two or more fans; and a processor for receiving the first and second signals and controlling the two or more individual fans based on the first and second signals. A fan module including: two or more individual fans, each fan having an air movement means and a motor engaged with the air movement means for accelerating air entering each of the two or more individual fans; a temperature sensor for sensing a temperature associated with the two or more fans and for outputting a first signal corresponding to the temperature; rotational speed sensor for outputting a second signal corresponding to a rotational speed of each of the two or more fans; and a processor for receiving the first and second signals and controlling the two or more individual fans based on the first and second signals.

  8. Fan System Assessment Tool (FSAT)

    Broader source: Energy.gov [DOE]

    The Fan System Assessment Tool (FSAT) is a free online software tool that helps industrial users quantify energy use and savings opportunities in industrial fan systems. Use FSAT to understand how...

  9. Fan System Assessment Tool Introduction

    Broader source: Energy.gov [DOE]

    This presentation provides an introduction to the Fan System Assessment Tool (FSAT). With FSAT, users can calculate the amount of energy used by their fan system; determine system efficiency; and quantify the savings potential of an upgraded system.

  10. Fans for Cooling | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heat & Cool » Home Cooling Systems » Fans for Cooling Fans for Cooling Ceiling fans circulate air in a room to help keep occupants cool. | Photo courtesy of ©iStockphoto/jimkruger Ceiling fans circulate air in a room to help keep occupants cool. | Photo courtesy of ©iStockphoto/jimkruger Circulating fans include ceiling fans, table fans, floor fans, and fans mounted to poles or walls. These fans create a wind chill effect that will make you more comfortable in your home, even if it's

  11. Box Integrals

    SciTech Connect (OSTI)

    Bailey, David H.; Borwein, Jonathan M.; Crandall, Richard E.

    2006-06-01

    By a "box integral" we mean here an expectation $\\langle|\\vec r - \\vec q|^s \\rangle$ where $\\vec r$runs over the unit $n$-cube,with $\\vec q$ and $s$ fixed, explicitly:\\begin eqnarray*&&\\int_01 \\cdots \\int_01 \\left((r_1 - q_1)2 + \\dots+(r_n-q_n)2\\right)^ s/2 \\ dr_1 \\cdots dr_n.\\end eqnarray* The study ofbox integrals leads one naturally into several disparate fields ofanalysis. While previous studies have focused upon symbolic evaluationand asymptotic analysis of special cases (notably $s = 1$), we workherein more generally--in interdisciplinary fashion--developing resultssuch as: (1) analytic continuation (in complex $s$), (2) relevantcombinatorial identities, (3) rapidly converging series, (4) statisticalinferences, (5) connections to mathematical physics, and (6)extreme-precision quadrature techniques appropriate for these integrals.These intuitions and results open up avenues of experimental mathematics,with a view to new conjectures and theorems on integrals of thistype.

  12. THE WORLD'S Biggest Fan Collection

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WORLD'S Biggest Fan Collection If you only know the Big Ass Fan Company as the preeminent designer and manufacturer of high volume, low speed fans for factories and cows, it's time you get to know us better. While we continue to lead the way in industrial and agricultural air movement, we've also refined these designs to bring the same innovation and benefits of our famous fans to circulate an ocean of air in sound-sensitive commercial spaces and homes. And when our customers said they wanted

  13. Hunter Fan: Order (2014-CE-32008)

    Broader source: Energy.gov [DOE]

    DOE ordered Hunter Fan Company to pay a $8,000 civil penalty after finding Hunter Fan had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  14. Fan System Assessment- End User Training

    Broader source: Energy.gov [DOE]

    Optimizing industrial fan systems can take on many forms, but any fan optimization project must meet the needs of the process. This self-paced workshop highlights the benefits of fan system...

  15. Training: Fan Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fan Systems Training: Fan Systems April 16, 2014 - 6:33pm Addthis Learn about the diverse training sessions offered. The courses are taught by highly qualified instructors who have met rigorous standards. View additional fan system resources. Fan System Assessment Tool - 2-hour webcast Availability: Online webcast AMO offers a convenient, introductory, two-hour webcast on the use of the DOE's Fan System Assessment Tool (FSAT). This session introduces the tool and presents the basics-and the

  16. Enforcement Policy: Certain Ceiling Fans and Certain Ceiling Fan Light Kits

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Certain Ceiling Fans and Certain Ceiling Fan Light Kits Enforcement Policy: Certain Ceiling Fans and Certain Ceiling Fan Light Kits Issued: December 15, 2015 Revised: March 15, 2016 DOE announced an enforcement policy in a Federal Register notice published on December 24, 2015. This document provides additional information about how DOE plans to implement the policy. This policy is limited to certain ceiling fans and certain ceiling fan light kits manufactured prior to

  17. Fan System Assessment Tool Fact Sheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fact Sheet Fan System Assessment Tool Fact Sheet Fact sheet describing how industrial plants can improve their fan system performance using AMO's Fan System Assessment Tool (FSAT). ...

  18. GLOVE BOX ATTACHMENT

    DOE Patents [OSTI]

    Butts, H.L.

    1962-02-13

    This invention comprises a housing unit to be fitted between a glove box port and a glove so that a slidable plate within the housing seals off the glove box port for evacuation of the glove box without damage to the glove. The housing and the glove may be evacuated without damage to the glove since movement of the glove is restricted during evacuation by the slidable plate. (AEC)

  19. BoxLib

    Energy Science and Technology Software Center (OSTI)

    2000-10-01

    BoxLib is a C++ foundation library used to aid in constructing parallel grid based Partial Differential Equation (PDE) solvers, particularly for Adaptive Mesh Refinement (AMR) applications.

  20. Hunter Fan: Proposed Penalty (2014-CE-32008)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Hunter Fan Company failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  1. Matthews Fan: Proposed Penalty (2014-CE-32012)

    Broader source: Energy.gov [DOE]

    DOE alleged in a Notice of Proposed Civil Penalty that Matthews-Gerbar, Ltd. d/b/a Matthews Fan Company failed to certify a variety of ceiling fans as compliant with the applicable energy conservation standards.

  2. Sound maintenance practices protect fan investments

    SciTech Connect (OSTI)

    Bauer, M.

    2009-11-15

    Since underground coal miners depend on axial fans, lack of maintenance could prove costly. A number of pre-emptive actions that can help keep fans running at optimal performance can also be taken. 2 photos.

  3. Parametric System Curves: Correlations Between Fan Pressure Rise and Flow for Large Commercial Buildings

    SciTech Connect (OSTI)

    Sherman, Max; Wray, Craig

    2010-05-19

    A substantial fraction of HVAC energy use in large commercial buildings is due to fan operation. Fan energy use depends in part on the relationship between system pressure drop and flow through the fan, which is commonly called a "system curve." As a step toward enabling better selections of air-handling system components and analyses of common energy efficiency measures such as duct static pressure reset and duct leakage sealing, this paper shows that a simple four-parameter physical model can be used to define system curves. Our model depends on the square of the fan flow, as is commonly considered. It also includes terms that account for linear-like flow resistances such as filters and coils, and for supply duct leakage when damper positions are fixed or are changed independently of static pressure or fan flow. Only two parameters are needed for systems with variable-position supply dampers (e.g., VAV box dampers modulating to control flow). For these systems, reducing or eliminating supply duct leakage does not change the system curve. The parametric system curve may be most useful when applied to field data. Non-linear techniques could be used to fit the curve to fan pressure rise and flow measurements over a range of operating conditions. During design, when measurements are unavailable, one could use duct design calculation tools instead to determine the coefficients.

  4. Glove box shield

    DOE Patents [OSTI]

    Brackenbush, L.W.; Hoenes, G.R.

    A shield for a glove box housing radioactive material is comprised of spaced apart clamping members which maintain three overlapping flaps in place therebetween. There is a central flap and two side flaps, the side flaps overlapping at the interior edges thereof and the central flap extending past the intersection of the side flaps in order to insure that the shield is always closed when the user wthdraws his hand from the glove box. Lead loaded neoprene rubber is the preferred material for the three flaps, the extent of lead loading depending upon the radiation levels within the glove box.

  5. Glove box shield

    DOE Patents [OSTI]

    Brackenbush, Larry W.; Hoenes, Glenn R.

    1981-01-01

    According to the present invention, a shield for a glove box housing radioactive material is comprised of spaced apart clamping members which maintain three overlapping flaps in place therebetween. There is a central flap and two side flaps, the side flaps overlapping at the interior edges thereof and the central flap extending past the intersection of the side flaps in order to insure that the shield is always closed when the user withdraws his hand from the glove box. Lead loaded neoprene rubber is the preferred material for the three flaps, the extent of lead loading depending upon the radiation levels within the glove box.

  6. BOXED LUNCH OPTIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BOXED LUNCH OPTIONS Price: $12 - Sandwich Boxed Lunches (includes sandwich, pickle, kettle-cooked chips, and cookie) 1. The Cheat Lake Ham, Turkey, Bacon and Pepper Jack cheese piled high on artisan bread 2. The Suncrest Oven roasted Turkey Breast on artisan bread with smoked Gouda cheese 3. The Pierpont Bacon, Gouda Cheese, Lettuce, Tomato, Roasted Red Pepper Mayo 4. The Mylan Park Natural hickory smoked Ham, Swiss cheese on artisan bread 5. The Star City Ham, Turkey, Salami, Provolone cheese

  7. Automatic box loader

    DOE Patents [OSTI]

    Eldridge, Harry H.; Jones, Robert A.; Lindner, Gordon M.; Hight, Paul H.

    1976-01-01

    This invention relates to a system for repetitively forming an assembly consisting of a single layer of tubes and a row of ferromagnetic armatures underlying the same, electromagnetically conveying the resulting assembly to a position overlying a storage box, and depositing the assembly in the box. The system includes means for simultaneously depositing a row of the armatures on the inclined surface of a tube retainer. Tubes then are rolled down the surface to form a single tube layer bridging the armatures. A magnet assembly carrying electromagnets respectively aligned with the armatures is advanced close to the tube layer, and in the course of this advance is angularly displaced to bring the pole pieces of the electromagnets into parallelism with the tube layer. The magnets then are energized to pick up the assembly. The loaded magnet assembly is retracted to a position overlying the box, and during this retraction is again displaced to bring the pole pieces of the electromagnets into a horizontal plane. Means are provided for inserting the loaded electromagnets in the box and then de-energizing the electromagnets to deposit the assembly therein. The system accomplishes the boxing of fragile tubes at relatively high rates. Because the tubes are boxed as separated uniform layers, subsequent unloading operations are facilitated.

  8. Advanced low noise cooling fans

    SciTech Connect (OSTI)

    Spek, H.F. van der; Nelissen, P.J.M.

    1995-02-01

    The results from an intensive research program show that it is possible to reduce the sound power level of cooling fans by 15 dB(A) by altering blade cord width and swept leading and trailing edge lines. Combination with the reduction of the pressure drop can result in a step of 20 dB(A) and a reduction with 25 percent of the absorbed power. Testing was conducted in accordance with recognized international measuring standards and the results will be presented, including consequences for cooling tower and condenser design.

  9. Fan System Assessment Tool User Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    User Manual Fan System Assessment Tool User Manual This user manual will help users understand how to use AMO's Fan System Assessment Tool. Fan System Assessment Tool User Manual ...

  10. Matthews Fan: Order (2014-CE-32012)

    Broader source: Energy.gov [DOE]

    DOE ordered Matthews-Gerbar, Ltd. d/b/a Matthews Fan Company to pay a $8,000 civil penalty after finding Matthews had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  11. Fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, Rajeev R.; Cowan, Thomas E.

    1996-01-01

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate.

  12. Fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, R.R.; Cowan, T.E.

    1996-06-11

    Disclosed are fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate. 3 figs.

  13. Shanghai Fan Qie Trading Ltd | Open Energy Information

    Open Energy Info (EERE)

    Shanghai Fan Qie Trading Ltd Place: Shanghai Municipality, China Sector: Solar Product: Solar panel wholesaler and system integrator. References: Shanghai Fan Qie Trading Ltd1...

  14. Cooling with a Whole House Fan | Department of Energy

    Office of Environmental Management (EM)

    circulating fans provide acceptable summer comfort for many families, even in hot weather. In addition to whole house fans, the ducts of your central heating and cooling...

  15. Profiles in garbage: Corrugated boxes

    SciTech Connect (OSTI)

    Miller, C.

    1997-12-01

    Corrugated boxes (also known as old corrugated containers, or OCC) are used to ship products to factories, warehouses, retail stores, offices, and homes. The primary market for OCC is the paperboard industry, which uses OCC for corrugated medium, linerboard, recycled paperboard, and other paper products. In addition, 2.6 million tons of OCC were exported in 1996. OCC provided 37% of the scrap paper that was exported in 1996. Some corrugated boxes can be reused before recycling. Corrugated boxes are easily and highly recyclable. Large producers such as grocery store warehouses and factories have recycled their corrugated boxes for some time. If shredded properly, uncoated corrugated boxes are easily compostable.

  16. Energy Conservation Program: Energy Conservation Standards for Ceiling Fans

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Energy Conservation Standards for Ceiling Fans Energy Conservation Program: Energy Conservation Standards for Ceiling Fans Energy Conservation Standards for Ceiling Fans ceiling fans nopr.pdf (1.68 MB) More Documents & Publications Energy Conservation Program: Final Rule; Test Procedures

  17. Fans for Cooling | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... If that's not practical, you may want to independently ventilate each level of your home with separate fans. Depending on the layout of your home, you might want to use several ...

  18. Fan System Assessment Tool Introduction - Webcast

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and other instruments as measurement tools in a fan performance test Develop a ... optimization savings When using FSAT keep in mind that: FSAT is best for the big picture. ...

  19. Synchronous and Cogged Fan Belt Performance Assessment

    SciTech Connect (OSTI)

    Cutler, D.; Dean, J.; Acosta, J.

    2014-02-01

    The GSA Regional GPG Team commissioned the National Renewable Energy Laboratory (NREL) to perform monitoring of cogged V-belts and synchronous belts on both a constant volume and a variable air volume fan at the Byron G. Rodgers Federal Building and U.S. Courthouse in Denver, Colorado. These motor/fan combinations were tested with their original, standard V-belts (appropriately tensioned by an operation and maintenance professional) to obtain a baseline for standard operation. They were then switched to the cogged V-belts, and finally to synchronous belts. The power consumption by the motor was normalized for both fan speed and air density changes. This was necessary to ensure that the power readings were not influenced by a change in rotational fan speed or by the power required to push denser air. Finally, energy savings and operation and maintenance savings were compiled into an economic life-cycle cost analysis of the different belt options.

  20. Cooling with a Whole House Fan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heat & Cool » Home Cooling Systems » Cooling with a Whole House Fan Cooling with a Whole House Fan This whole-house fan is installed on the ceiling between the attic and living space. The louvers close when the fan is not operating. | Photo courtesy of Allison Casey. This whole-house fan is installed on the ceiling between the attic and living space. The louvers close when the fan is not operating. | Photo courtesy of Allison Casey. Whole house cooling using a whole house fan can

  1. Performance Assessment of Photovoltaic Attic Ventilator Fans

    Broader source: Energy.gov [DOE]

    A case study of photovoltaic attic ventilator fans was conducted on an occupied single family home in Central Florida. Two fans were installed at mid-summer in an instrumented home where attic air temperature, meteorological conditions and space cooling electric power were measured. The home already had an attic radiant barrier, but still experienced attic air temperatures in excess of 130oF.

  2. Projection optics box

    DOE Patents [OSTI]

    Hale, Layton C.; Malsbury, Terry; Hudyma, Russell M.; Parker, John M.

    2000-01-01

    A projection optics box or assembly for use in an optical assembly, such as in an extreme ultraviolet lithography (EUVL) system using 10-14 nm soft x-ray photons. The projection optics box utilizes a plurality of highly reflective optics or mirrors, each mounted on a precision actuator, and which reflects an optical image, such as from a mask, in the EUVL system onto a point of use, such as a target or silicon wafer, the mask, for example, receiving an optical signal from a source assembly, such as a developed from laser system, via a series of highly reflective mirrors of the EUVL system. The plurality of highly reflective optics or mirrors are mounted in a housing assembly comprised of a series of bulkheads having wall members secured together to form a unit construction of maximum rigidity. Due to the precision actuators, the mirrors must be positioned precisely and remotely in tip, tilt, and piston (three degrees of freedom), while also providing exact constraint.

  3. Impedance Measurement Box

    ScienceCinema (OSTI)

    Christophersen, Jon

    2013-05-28

    Energy storage devices, primarily batteries, are now more important to consumers, industries and the military. With increasing technical complexity and higher user expectations, there is also a demand for highly accurate state-of-health battery assessment techniques. IMB incorporates patented, proprietary, and tested capabilities using control software and hardware that can be part of an embedded monitoring system. IMB directly measures the wideband impedance spectrum in seconds during battery operation with no significant impact on service life. It also can be applied to batteries prior to installation, confirming health before entering active service, as well as during regular maintenance. For more information about this project, visit http://www.inl.gov/rd100/2011/impedance-measurement-box/

  4. PMT BOX TUFTS - Sheet1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REV 1 2 3 4 A B B A 4 3 2 1 APPRV DATE REV DESCRIPTION REVISIONS ZONE FILE: PMT BOX TUFTS PMT BOX ASS'Y 2:1 11 13 RSF RSF RSF - - - - - - - INITIAL ISSUE - - WEIGHT: 0.077...

  5. PMT BOX TUFTS - Sheet1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REV 1 2 3 4 A B B A 4 3 2 1 APPRV DATE REV DESCRIPTION REVISIONS ZONE FILE: PMT BOX TUFTS PMT BOX ASS'Y 2:1 10 13 RSF RSF RSF - - - - - - - INITIAL ISSUE - - WEIGHT: 0.254...

  6. Fan-less long range alpha detector

    DOE Patents [OSTI]

    MacArthur, D.W.; Bounds, J.A.

    1994-05-10

    A fan-less long range alpha detector is disclosed which operates by using an electrical field between a signal plane and the surface or substance to be monitored for air ions created by collisions with alpha radiation. Without a fan, the detector can operate without the possibility of spreading dust and potential contamination into the atmosphere. A guard plane between the signal plane and the electrically conductive enclosure and maintained at the same voltage as the signal plane, reduces leakage currents. The detector can easily monitor soil, or other solid or liquid surfaces. 2 figures.

  7. Fan-less long range alpha detector

    DOE Patents [OSTI]

    MacArthur, Duncan W.; Bounds, John A.

    1994-01-01

    A fan-less long range alpha detector which operates by using an electrical field between a signal plane and the surface or substance to be monitored for air ions created by collisions with alpha radiation. Without a fan, the detector can operate without the possibility of spreading dust and potential contamination into the atmosphere. A guard plane between the signal plane and the electrically conductive enclosure and maintained at the same voltage as the signal plane, reduces leakage currents. The detector can easily monitor soil, or other solid or liquid surfaces.

  8. Terminal structure

    DOE Patents [OSTI]

    Schmidt, Frank; Allais, Arnaud; Mirebeau, Pierre; Ganhungu, Francois; Lallouet, Nicolas

    2009-10-20

    A terminal structure (2) for a superconducting cable (1) is described. It consists of a conductor (2a) and an insulator (2b) that surrounds the conductor (2a), wherein the superconducting cable (1) has a core with a superconducting conductor (5) and a layer of insulation that surrounds the conductor (5), and wherein the core is arranged in such a way that it can move longitudinally in a cryostat. The conductor (2a) of the terminal structure (2) is electrically connected with the superconducting conductor (5) or with a normal conductor (6) that is connected with the superconducting conductor (5) by means of a tubular part (7) made of an electrically conductive material, wherein the superconducting conductor (5) or the normal conductor (6) can slide in the part (7) in the direction of the superconductor.

  9. Fan-In Communications On A Cray Gemini Interconnect (Conference...

    Office of Scientific and Technical Information (OSTI)

    Using the Cray Gemini interconnect as our platform, we present a study of an important class of communication operations the fan-in communication pattern. By its nature, fan-in ...

  10. Improving Fan System Performance: A Sourcebook for Industry

    SciTech Connect (OSTI)

    2003-04-01

    This is one of a series of sourcebooks on motor-driven equipment produced by the Industrial Technologies Program. It provides a reference for industrial fan systems users, outlining opportunities to improve fan system performance.

  11. Solar Decathlon 2015: Energy.gov Fan Favorite Poll Results |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Decathlon 2015: Energy.gov Fan Favorite Poll Results Solar Decathlon 2015: Energy.gov Fan Favorite Poll Results October 22, 2015 - 10:10am Addthis West Virginia University...

  12. Aluminum alloys for satellite boxes : engineering guidelines...

    Office of Scientific and Technical Information (OSTI)

    Aluminum alloys for satellite boxes : engineering guidelines for obtaining adequate ... Title: Aluminum alloys for satellite boxes : engineering guidelines for obtaining adequate ...

  13. DOE Publishes Request for Information for Ceiling Fans

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a request for information regarding energy conservation standards for ceiling fans.

  14. Improving Fan System Performance: A Sourcebook for Industry | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Fan System Performance: A Sourcebook for Industry Improving Fan System Performance: A Sourcebook for Industry This sourcebook is designed to provide fan system users with a reference outlining opportunities to improve system performance. It is not intended to be a comprehensive technical text on improving fan systems, but rather a document that makes users aware of potential performance improvements, provides some practical guidelines, and details where the user can find more help.

  15. List of Whole House Fans Incentives | Open Energy Information

    Open Energy Info (EERE)

    upgrades Water Heaters Whole House Fans LED Exit Signs CHPCogeneration Biomass Photovoltaics Yes Georgia Environmental Finance Authority - Residential Energy Efficiency...

  16. Hexahedron Projection by Triangle Fans and Strips

    Energy Science and Technology Software Center (OSTI)

    2007-05-10

    The program divides the projection of a hexahedron with not-necessarily-planar quadrilateral faces, such as would arise in a curvilinear grid, by the projections of its edges, into polygons overlapped by a single front-facing and a single back-facing face. These polygons are further organized into triangle strips and fans, for rapid volume rendering in graphics hardware.

  17. Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP Final_Rule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards

  18. Plate forming and break down pizza box

    DOE Patents [OSTI]

    Pantisano, Frank; Devine, Scott M.

    1992-01-01

    A standard corrugated paper pizza box is provided with slit cuts cut through the top panel of the pizza box in a shape to form four circular serving plates with a beveled raised edge and cross slit cuts through the bottom panel of the pizza box separating the box into four essentially equal portions for easy disposal.

  19. Prop-fan with improved stability

    SciTech Connect (OSTI)

    Rothman, E.A.; Violette, J.A.

    1988-03-15

    A prop-fan is described comprising swept, rotatable airfoil blades pivotally mounted to a hub for pitch change movement with respect thereto, and having a solidity ratio of 1.0 or greater at the roots of the blades and less than 1.0 at the tips of the blades. The prop fan is operable at or above critical Mach numbers and at transonic or supersonic tip speeds, and is characterized by: each of the blades having a leading edge. The leading edge, from a location thereon at approximately a midportion of the span and the blade, outwardly to the tip thereof, is curved in a chordal direction to define blade sweep while exhibiting no significant offset curvature in a span-wise direction.

  20. Submitting Organization Hongyou Fan Sandia National Laboratories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

     2007 R&D 100 Award Entry Form  Submitting Organization Hongyou Fan Sandia National Laboratories Advanced Materials Laboratory 1001 University Boulevard SE Albuquerque, NM 87106, USA 505-272-7128 (phone) 505-272-7336 (fax) hfan@sandia.gov AFFIRMATION: I affirm that all information submitted as a part of, or supplemental to, this entry is a fair and accurate represen- tation of this product. Submitter's signature_______________________________ Earl Stromberg Lockheed Martin

  1. Termination unit

    DOE Patents [OSTI]

    Traeholt, Chresten [Frederiksberg, DK; Willen, Dag [Klagshamn, SE; Roden, Mark [Newnan, GA; Tolbert, Jerry C [Carrollton, GA; Lindsay, David [Carrollton, GA; Fisher, Paul W [Heiskell, TN; Nielsen, Carsten Thidemann [Jaegerspris, DK

    2014-01-07

    This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

  2. NETL's JIC in a box

    ScienceCinema (OSTI)

    David Anna

    2010-01-08

    The National Energy Technology Laboratory developed the idea of a portable joint information center AKA JIC in-a-box. This video discribes some of the equipment in the portable JIC as well as some of the methodology that NETL developed as a result of this portable JIC concept.

  3. Variable Speed Fan Retrofits for Computer Room Air Conditioners |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Variable Speed Fan Retrofits for Computer Room Air Conditioners Variable Speed Fan Retrofits for Computer Room Air Conditioners Case study describes various concepts for more cost-effective cooling solutions in data centers, while keeping in mind that the reliability of computing systems and their respective cooling systems is always a key criterion. Download the Variable Speed Fan Retrofits for Computer Room Air Conditioners case study. (352.57 KB) More Documents &

  4. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Publishes Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans. 79 FR 500 (January 3, 2014). Find more information on the rulemaking, including milestones, statutory authority, rulemaking documents, and any other related rulemakings. All notices, public

  5. QM Power Inc: Commercial Refrigeration Fan Applications | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy QM Power Inc: Commercial Refrigeration Fan Applications QM Power Inc: Commercial Refrigeration Fan Applications Q-Sync High Efficiency 9-12 Watt Fan Motors Q-Sync High Efficiency 9-12 Watt Fan Motors Performer: QM Power Inc. - Lee's Summit, MO Partners: Oak Ridge National Labs - Oak Ridge, TN DOE Funding: $1,004,653 Cost Share: $1,004,653 Project Term: October 1, 2014 - March 31, 2018 Funding Opportunity: DE-FOA-0001084 - Commercial Building Technology Demonstrations PROJECT OBJECTIVE

  6. Energy Conservation Standards for Ceiling Fan Light Kits Notice...

    Broader source: Energy.gov (indexed) [DOE]

    Kits notice of proposed rulemaking More Documents & Publications ISSUANCE 2015-06-25: Energy Conservation Program: Energy Conservation Standards for Ceiling Fan Light Kits,...

  7. Prop-Fan technical progress leading to technology readiness

    SciTech Connect (OSTI)

    Gatzen, B.S.; Adamson, W.M.

    1981-01-01

    Technical activity on Prop-Fan propulsion has reached an impotant milestone. The analytical and scale model efforts now provide verification of design techniques necessary to initiate the large scale rotor technology demonstration required to achieve Prop-Fan technology readiness. Small scale model rotor programs have demonstrated high uninstalled Prop-Fan efficiency, reduced source noise with swept blades, and satisfactory structural dynamics. This paper presents the technical progress to date and the need to conduct a large scale program. The key element of the large scale program is a high speed flight test of the Prop-Fan rotor mounted on a swept wing. 74 refs.

  8. Variable Speed Fan Retrofits for Computer Room Air Conditioners

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brian Fortenbery Synapsense: Garret Smith, Patricia Nealon Vigilent: Corinne Vita ... Figure 1. Fan power as a function of speed (the "cube law"). (Credit: Smith, 2013) It ...

  9. Solar Pizza Oven Box k - 6

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ready to Build? BUILD A PIZZA BOX SOLAR OVEN Background The sun is hot enough to bake ... Be sure to have an adult help you with this Materials - One pizza box from a local pizza ...

  10. Glove box for water pit applications

    DOE Patents [OSTI]

    Mills, William C.; Rabe, Richard A.

    2005-01-18

    A glove box assembly that includes a glove box enclosure attached to a longitudinally extending hollow tube having an entranceway, wherein the portion of the tube is in a liquid environment. An elevator member is provided for raising an object that is introduced into the hollow tube from the liquid environment to a gas environment inside the glove box enclosure while maintaining total containment.

  11. Illumination box and camera system

    DOE Patents [OSTI]

    Haas, Jeffrey S.; Kelly, Fredrick R.; Bushman, John F.; Wiefel, Michael H.; Jensen, Wayne A.; Klunder, Gregory L.

    2002-01-01

    A hand portable, field-deployable thin-layer chromatography (TLC) unit and a hand portable, battery-operated unit for development, illumination, and data acquisition of the TLC plates contain many miniaturized features that permit a large number of samples to be processed efficiently. The TLC unit includes a solvent tank, a holder for TLC plates, and a variety of tool chambers for storing TLC plates, solvent, and pipettes. After processing in the TLC unit, a TLC plate is positioned in a collapsible illumination box, where the box and a CCD camera are optically aligned for optimal pixel resolution of the CCD images of the TLC plate. The TLC system includes an improved development chamber for chemical development of TLC plates that prevents solvent overflow.

  12. Associated Post Office Box 117

    Office of Legacy Management (LM)

    Associated Post Office Box 117 Oak Ridge Tennessee 37831 -01 17 Energy Enuronmerl! Systems DIWSIO~I September 7, 1990 ? -iAsWP / Fll ,- ,) 3 Mr. Alexander Williams Office of Environmental Restoration and Waste Management U.S. Department of Energy Washington, DC 20545 Subject: PRELIMINARY SITE VISIT - REVERE COPPER AND BRASS CORP. Dear Mr. Williams: This letter is in response to your request concerning the results of the preliminary site visit to the former Revere Copper and Brass Corporation

  13. Choosing the right boiler air fans at Weston 4

    SciTech Connect (OSTI)

    Spring, N.

    2009-04-15

    When it came to choosing the three 'big' boiler air fans - forced draft, induced draft and primary air, the decision revolved around efficiency. The decision making process for fan selection for the Western 4 supercritical coal-fired plant is described in this article. 3 photos.

  14. Microsoft Word - Ex Parte Memo re October 28, 2014 Meeting on Fans

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Council Date November 4, 2014 Re Ex Parte Communication On Tuesday, October 28, 2014, several representatives of fan manufacturers and energy efficiency advocates met with the Department of Energy to discuss potential standards for commercial and industrial fans. The fan manufacturers and energy efficiency advocates presented information concerning the fan market, fan energy-efficiency and the most promising means of designing federal efficiency standards for commercial and industrial fans. The

  15. Costs and benefits of energy efficiency improvements in ceiling fans

    SciTech Connect (OSTI)

    Shah, Nihar; Sathaye, Nakul; Phadke, Amol; Letschert, Virginie

    2013-10-15

    Ceiling fans contribute significantly to residential electricity consumption, especially in developing countries with warm climates. The paper provides analysis of costs and benefits of several options to improve the efficiency of ceiling fans to assess the global potential for electricity savings and green house gas (GHG) emission reductions. Ceiling fan efficiency can be cost-effectively improved by at least 50% using commercially available technology. If these efficiency improvements are implemented in all ceiling fans sold by 2020, 70 terawatt hours per year could be saved and 25 million metric tons of carbon dioxide equivalent (CO2-e) emissions per year could be avoided, globally. We assess how policies and programs such as standards, labels, and financial incentives can be used to accelerate the adoption of efficient ceiling fans in order to realize potential savings.

  16. Method for fabricating fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, Rajeev R.; Cowan, Thomas E.

    1994-01-01

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate.

  17. Method for fabricating fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, R.R.; Cowan, T.E.

    1994-12-27

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate. 3 figures.

  18. Buildings Energy Data Book: 5.5 Thermal Distribution Systems

    Buildings Energy Data Book [EERE]

    5 Typical Commercial Building Thermal Energy Distribution Design Load Intensities (Watts per SF) Distribution System Fans Other Central System Supply Fans Cooling Tower Fan Central System Return Fans Air-Cooled Chiller Condenser Fan 0.6 Terminal Box Fans 0.5 Exhaust Fans (2) Fan-Coil Unit Fans (1) Condenser Fans 0.6 Packaged or Split System Indoor Blower 0.6 Pumps Chilled Water Pump Condenser Water Pump Heating Water Pump Note(s): Source(s): 0.1 - 0.2 0.1 - 0.2 1) Unducted units are lower than

  19. BoxLib Case Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    287 2.246 2.203 2.183 2.231 2.265 2003-2016 All Grades - Reformulated Areas 2.287 2.246 2.203 2.183 2.231 2.265 2003-2016 Regular 2.178 2.138 2.092 2.064 2.130 2.160 2003-2016 Reformulated Areas 2.178 2.138 2.092 2.064 2.130 2.160 2003-2016 Midgrade 2.437 2.388 2.357 2.355 2.356 2.404 2003-2016 Reformulated Areas 2.437 2.388 2.357 2.355 2.356 2.404 2003-2016 Premium 2.626 2.585 2.553 2.548 2.555 2.597 2003-2016 Reformulated Areas 2.626 2.585 2.553 2.548 2.555 2.59

    BoxLib Case Study BoxLib

  20. Interchangeable breech lock for glove boxes

    DOE Patents [OSTI]

    Lemonds, David Preston

    2015-11-24

    A breech lock for a glove box is provided that may be used to transfer one or more items into the glove box. The breech lock can be interchangeably installed in place of a plug, glove, or other device in a port or opening of a glove box. Features are provided to aid the removal of items from the breech lock by a gloved operator. The breech lock can be reused or, if needed, can be replaced with a plug, glove, or other device at the port or opening of the glove box.

  1. Property:Building/SPElectrtyUsePercCirculationFans | Open Energy...

    Open Energy Info (EERE)

    sePercCirculationFans" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 18.6715328229 + Sweden Building 05K0002 + 0.0 + Sweden Building...

  2. Property:Building/SPElectrtyUsePercFans | Open Energy Information

    Open Energy Info (EERE)

    SPElectrtyUsePercFans" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 7.29539104961 + Sweden Building 05K0002 + 16.7673965927 + Sweden...

  3. Improving Fan System Performance - A Sourcebook for Industry

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... DWDI-double-width, double-inlet fans dynamic balance-the mechanical balancing of a ... express the relation between velocity, viscosity, density, and dimensions in a system of ...

  4. New Energy Efficiency Standards for Furnace Fans to Reduce Carbon...

    Energy Savers [EERE]

    more than a year's carbon pollution from the entire U.S. electricity system. Furnace fans are used to circulate air through ductwork in residential heating and cooling equipment. ...

  5. Cameron Terminal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cameron Terminal Cameron Terminal Cameron LNG Terminal Long-Term Contract Information and Registrations at U.S. LNG Export Facilities Filing Date Type (1) Description 061013 C ...

  6. Record of Communication Concerning Ceiling Fan and Ceiling Fan Light Kit Framework Document—Docket No. EERE-2012-BT-STD-0045

    Broader source: Energy.gov [DOE]

    This memo provides an overview of communications made to DOE staff on the subject of possible changes to standards and test procedures for ceiling fans and ceiling fan light kits.

  7. Widget:ExpandableBoxStart | Open Energy Information

    Open Energy Info (EERE)

    will be collapsed upon page load and can be expanded by clicking anywhere on the box. Once expanded, the box can be collapsed by clicking anywhere on the box header (the original...

  8. Widget:ExpandableBoxEnd | Open Energy Information

    Open Energy Info (EERE)

    will be collapsed upon page load and can be expanded by clicking anywhere on the box. Once expanded, the box can be collapsed by clicking anywhere on the box header (the original...

  9. Box Canyon Motel Space Heating Low Temperature Geothermal Facility...

    Open Energy Info (EERE)

    Canyon Motel Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Box Canyon Motel Space Heating Low Temperature Geothermal Facility Facility Box...

  10. 70004 PMT BOX TUFTS - Sheet1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    06810220 MSC - 8 PMT BOX, TUFTS UNIVERSITY 1 1 - 4 26 0.193 93496A415 MCMASTER CARR 10 NOM LOCKWASHER- BRASS A Parts List ITEM NO. QTY DETSHT ASSYSHT DESCRIPTION MATERIAL SIZE...

  11. Solar Pizza Oven Box k - 6

    Office of Environmental Management (EM)

    Ready to Build? BUILD A PIZZA BOX SOLAR OVEN Background The sun is hot enough to bake food. Here's how to make a simple solar oven that gets hot enough to warm up cookies and other...

  12. Glove box on vehicular instrument panel

    DOE Patents [OSTI]

    Atarashi, Kazuya

    1985-01-01

    A glove box for the upper surface of an automobile dashboard whereby it may be positioned close to the driver. The glove box lid is pivotally supported by arms extending down either side to swing forwardly for opening. A hook is pivotally support adjacent an arm and weighted to swing into engagement with the arm to prevent opening of the lid during abrupt deceleration. A toggle spring assists in maintaining the lid in either the open or closed position.

  13. Department of Energy Idaho - Press Box

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Press Box Press Box DOE Pulse DOE-EM Related Newsletters on the American Recovery and Reinvestment Act of 2009 DOE-Idaho Operations Summary DOE-ID Press Releases and Video Clips DOE-HQ News Press Releases Idaho Media INL Press Releases Public Affairs INL IMPACTS Boise State University recently did a study of the economic impacts of the Idaho National Laboratory and the other contractors doing work at DOE's Idaho Site. The link below will take you to the study.

  14. HYDROGEN AND VOC RETENTION IN WASTE BOXES

    SciTech Connect (OSTI)

    PACE ME; MARUSICH RM

    2008-11-21

    The Hanford Waste Management Project Master Documented Safety Analysis (MDSA) (HNF-14741, 2003) identifies derived safety controls to prevent or mitigate the risks of a single-container deflagration during operations requiring moving, venting or opening transuranic (TRU)-waste containers. The issue is whether these safety controls are necessary for operations involving TRU-waste boxes that are being retrieved from burial at the Hanford Site. This paper investigates the potential for a deflagration hazard within these boxes and whether safety controls identified for drum deflagration hazards should be applied to operations involving these boxes. The study evaluates the accumulation of hydrogen and VOCs within the waste box and the transport of these gases and vapors out of the waste box. To perform the analysis, there were numerous and major assumptions made regarding the generation rate and the transport pathway dimensions and their number. Since there is little actual data with regards to these assumptions, analyses of three potential configurations were performed to obtain some indication of the bounds of the issue (the concentration of hydrogen or flammable VOCs within a waste box). A brief description of each of the three cases along with the results of the analysis is summarized.

  15. Superconducting Cable Termination

    DOE Patents [OSTI]

    Sinha, Uday K.; Tolbert, Jerry

    2005-08-30

    Disclosed is a termination that connects high temperature superconducting (HTS) cable immersed in pressurized liquid nitrogen to high voltage and neutral (shield) external bushings at ambient temperature and pressure. The termination consists of a splice between the HTS power (inner) and shield (outer) conductors and concentric copper pipes which are the conductors in the termination. There is also a transition from the dielectric tape insulator used in the HTS cable to the insulators used between and around the copper pipe conductors in the termination. At the warm end of the termination the copper pipes are connected via copper braided straps to the conventional warm external bushings which have low thermal stresses. This termination allows for a natural temperature gradient in the copper pipe conductors inside the termination which enables the controlled flashing of the pressurized liquid coolant (nitrogen) to the gaseous state. Thus the entire termination is near the coolant supply pressure and the high voltage and shield cold bushings, a highly stressed component used in most HTS cables, are eliminated. A sliding seal allows for cable contraction as it is cooled from room temperature to ˜72-82 K. Seals, static vacuum, and multi-layer superinsulation minimize radial heat leak to the environment.

  16. Superconducting Cable Termination

    DOE Patents [OSTI]

    Sinha, Uday K. (Carrollton, GA); Tolbert, Jerry (Newnan, GA)

    2005-08-30

    Disclosed is a termination that connects high temperature superconducting (HTS) cable immersed in pressurized liquid nitrogen to high voltage and neutral (shield) external bushings at ambient temperature and pressure. The termination consists of a splice between the HTS power (inner) and shield (outer) conductors and concentric copper pipes which are the conductors in the termination. There is also a transition from the dielectric tape insulator used in the HTS cable to the insulators used between and around the copper pipe conductors in the termination. At the warm end of the termination the copper pipes are connected via copper braided straps to the conventional warm external bushings which have low thermal stresses. This termination allows for a natural temperature gradient in the copper pipe conductors inside the termination which enables the controlled flashing of the pressurized liquid coolant (nitrogen) to the gaseous state. Thus the entire termination is near the coolant supply pressure and the high voltage and shield cold bushings, a highly stressed component used in most HTS cables, are eliminated. A sliding seal allows for cable contraction as it is cooled from room temperature to 72-82 K. Seals, static vacuum, and multi-layer superinsulation minimize radial heat leak to the environment.

  17. Photo of the Week: Fan-tastic | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fan-tastic Photo of the Week: Fan-tastic August 17, 2012 - 10:30am Addthis In Jonesboro, Arkansas, a Nordex USA employee stands between utility-scale components that will eventually make up a completed wind turbine. Under the Recovery Act, Nordex USA received a tax credit to assist in the creation of the Jonesboro manufacturing facility, which opened in October 2010. | Photo courtesy of Nordex USA. In Jonesboro, Arkansas, a Nordex USA employee stands between utility-scale components that will

  18. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...

    Energy Savers [EERE]

    7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking ...

  19. How Has a Ceiling Fan Affected the Way You Heat and Cool Your...

    Office of Environmental Management (EM)

    Has a Ceiling Fan Affected the Way You Heat and Cool Your Home? How Has a Ceiling Fan Affected the Way You Heat and Cool Your Home? September 23, 2010 - 7:30am Addthis On Monday, ...

  20. Development of an Innovative, High-Efficiency Radon Fan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy an Innovative, High-Efficiency Radon Fan Development of an Innovative, High-Efficiency Radon Fan Mechanical Solutions Inc. will use the latest modeling techniques, in combination with decades of experience and market leader Fantech, to produce a high-efficiency radon fan design. Source: Mechanical Solutions Inc. Mechanical Solutions Inc. will use the latest modeling techniques, in combination with decades of experience and market leader Fantech, to produce a high-efficiency radon fan

  1. Energy Conservation Standards for Ceiling Fan Light Kits Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Energy Conservation Standards for Ceiling Fan Notice of proposed rulemaking (NOPR) and announcement of public meeting.

  2. DOE Publishes Notice of Proposed Rulemaking for Residential Furnace Fans Energy Conservation Standards

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy has published a notice of proposed rulemaking regarding energy conservation standards for residential furnace fans.

  3. Optimization of cable terminations

    SciTech Connect (OSTI)

    Nikolajevic, S.V.; Pekaric-Nad, N.M.; Dimitrijevic, R.M.

    1997-04-01

    This paper describes a study of various termination constructions for medium voltage cross-linked polyethylene (XLPE) cables. A special device was used for electrical field measurements around the cable termination which made it possible to monitor how stress relief materials with different permittivity and placement of isolated or grounded embedded electrodes (EE) affected electrical stress grading. The results of measurements for each configuration were examined by mathematical modeling based on the finite element method (FEM). Finally, the selected constructions of cable termination have passed severe test conditions with load cycling.

  4. Pump and Fan Technology Characterization and R&D Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report provides the Building Technologies Office (BTO) and the research and development (R&D) community with a technical and market analysis of pumps and fans as they pertain to commercial and residential buildings as well as key conclusions regarding the R&D opportunities that can help achieve BTO’s energy savings goals.

  5. Nearest Alignment Space Termination

    Energy Science and Technology Software Center (OSTI)

    2006-07-13

    Near Alignment Space Termination (NAST) is the Greengenes algorithm that matches up submitted sequences with the Greengenes database to look for similarities and align the submitted sequences based on those similarities.

  6. Termination and Recovery

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume defines event Termination and determination of when it is appropriate to cease emergency response activities and of associated notifications. Canceled by DOE G 151.1-4.

  7. Experimental Evaluation of Installed Cooking Exhaust Fan Performance

    SciTech Connect (OSTI)

    Singer, Brett C.; Delp, William W.; Apte, Michael G.

    2010-11-01

    The installed performance of cooking exhaust fans was evaluated through residential field experiments conducted on a sample of 15 devices varying in design and other characteristics. The sample included two rear downdraft systems, two under-cabinet microwave over range (MOR) units, three different installations of an under-cabinet model with grease screens across the bottom and no capture hood, two devices with grease screens covering the bottom of a large capture hood (one under-cabinet, one wall-mount chimney), four under-cabinet open hoods, and two open hoods with chimney mounts over islands. Performance assessment included measurement of airflow and sound levels across fan settings and experiments to quantify the contemporaneous capture efficiency for the exhaust generated by natural gas cooking burners.Capture efficiency is defined as the fraction of generated pollutants that are removed through the exhaust and thus not available for inhalation of household occupants. Capture efficiency (CE) was assessed for various configurations of burner use (e.g., single front, single back, combination of one front and one back, oven) and fan speed setting. Measured airflow rates were substantially lower than the levels noted in product literature for many of the units. This shortfall was observed for several units costing in excess of $1000. Capture efficiency varied widely (from<5percent to roughly 100percent) across devices and across conditions for some devices. As expected, higher capture efficiencies were achieved with higher fan settings and the associated higher air flow rates. In most cases, capture efficiencies were substantially higher for rear burners than for front burners. The best and most consistent performance was observed for open hoods that covered all cooktop burners and operated at higher airflow rates. The lowest capture efficiencies were measured when a front burner was used with a rear backdraft system or with lowest fan setting for above the range

  8. Advances in the theory of box integrals

    SciTech Connect (OSTI)

    Bailey, David H.; Borwein, J.M.; Crandall, R.E.

    2009-06-25

    Box integrals - expectations <|{rvec r}|{sup s}> or <|{rvec r}-{rvec q}|{sup s}> over the unit n-cube (or n-box) - have over three decades been occasionally given closed forms for isolated n,s. By employing experimental mathematics together with a new, global analytic strategy, we prove that for n {le} 4 dimensions the box integrals are for any integer s hypergeometrically closed in a sense we clarify herein. For n = 5 dimensions, we show that a single unresolved integral we call K{sub 5} stands in the way of such hyperclosure proofs. We supply a compendium of exemplary closed forms that naturally arise algorithmically from this theory.

  9. 2010sr31_box-remediation.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thursday, November 18, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 292-2484 paivi.nettamo@srs.gov SRS Recovery Act TRU Waste Project Ahead of Schedule with Box Remediation Program Aiken, SC - The U.S. Department of Energy's Savannah River Site (SRS) started off the last 12 months of the American Recovery and Reinvestment Act with an enormous success in its legacy transuranic (TRU) waste program. The H-Canyon box remediation program has not only met, but beat, its deadline for

  10. A simple model simulating a fan as a source of axial and circumferential body forces

    Energy Science and Technology Software Center (OSTI)

    2002-07-01

    This software can be used in a computational fluids dynamics (CFD) code to represent a fan as a source of axial and circumferential body forces. The combined software can be used effectively in car design analyses that involve many underhood thermal management simulations. FANMOD uses as input the rotational speed of the fan, geometric fan data, and the lift and drag coefficients of the blades, and predicts the body forces generated by the fan inmore » the axial and circumferential directions. These forces can be used as momentum forces in a CFD code to simulate the effect of the fan in an underhood thermal management simulation.« less

  11. Nondestructive assay of boxed radioactive waste

    SciTech Connect (OSTI)

    Gilles, W.P.; Roberts, R.J.; Jasen, W.G.

    1992-12-01

    This paper describes the problems related to the nondestructive assay (NDA) of boxed radioactive waste at the Hanford Site and how Westinghouse Hanford company (WHC) is solving the problems. The waste form and radionuclide content are described. The characteristics of the combined neutron and gamma-based measurement system are described.

  12. Safety evaluation for packaging CPC metal boxes

    SciTech Connect (OSTI)

    Romano, T.

    1995-05-15

    This Safety Evaluation for Packaging (SEP) provides authorization for the use of Container Products Corporation (CPC) metal boxes, as described in this document, for the interarea shipment of radioactive contaminated equipment and debris for storage in the Central Waste Complex (CWC) or T Plant located in the 200 West Area. Authorization is granted until November 30, 1995. The CPC boxes included in this SEP were originally procured as US Department of Transportation (DOT) Specification 7A Type A boxes. A review of the documentation provided by the manufacturer revealed the documentation did not adequately demonstrate compliance to the 4 ft drop test requirement of 49 CFR 173.465(c). Preparation of a SEP is necessary to document the equivalent safety of the onsite shipment in lieu of meeting DOT packaging requirements until adequate documentation is received. The equivalent safety of the shipment is based on the fact that the radioactive contents consist of contaminated equipment and debris which are not dispersible. Each piece is wrapped in two layers of no less than 4 mil plastic prior to being placed in the box which has an additional 10 mil liner. Pointed objects and sharp edges are padded to prevent puncture of the plastic liner and wrapping.

  13. ISSUANCE 2015-06-25: Energy Conservation Program: Energy Conservation Standards for Ceiling Fan Light Kits, Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Energy Conservation Standards for Ceiling Fan Light Kits, Notice of Proposed Rulemaking

  14. ISSUANCE: 2014-12-03 Energy Conservation Standards for Commercial and Industrial Fans and Blowers: Availability of Provisional Analysis Tools

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Standards for Commercial and Industrial Fans and Blowers: Availability of Provisional Analysis Tools

  15. ISSUANCE 2015-04-21: Energy Conservation Standards for Commercial and Industrial Fans and Blowers: Availability of Provisional Analysis Tools

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Standards for Commercial and Industrial Fans and Blowers: Availability of Provisional Analysis Tools

  16. Saturation of the fan instability: Nonlinear merging of resonances

    SciTech Connect (OSTI)

    Krafft, C.; Volokitin, A.; Zaslavsky, A.

    2005-11-15

    A Hamiltonian self-consistent wave-particle model has been built in order to study the nonlinear interaction of a packet of waves with a nonequilibrium electron distribution in a magnetized background plasma. In particular, this model and the corresponding numerical code allow us to study in detail the excitation by the fan instability of lower hybrid waves interacting resonantly with a strongly anisotropic electron velocity distribution. This paper points out the essential role played by the process of ''dynamical merging of resonances,'' which results from an instability of the trapped particles' motion, leading, in its explosive stage, to the amplification of the waves' amplitudes. Moreover the relaxation phase of the fan instability is shown to lead to a universal distribution of the particles' velocities, which does not depend on the number of waves and on their distribution in the k space.

  17. Evaluation of Retrofit Variable-Speed Furnace Fan Motors

    SciTech Connect (OSTI)

    Aldrich, R.; Williamson, J.

    2014-01-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) has evaluated the Concept 3 (tm) replacement motors for residential furnaces. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost-effectiveness. The results of this study are intended to be useful to home performance contractors, HVAC contractors, and home efficiency program stakeholders. The project includes eight homes in and near Syracuse, NY. Tests and monitoring was performed both before and after fan motors were replaced. Average fan power reductions were approximately 126 Watts during heating and 220 Watts during cooling operation. Over the course of entire heating and cooling seasons, these translated into average electric energy savings of 163 kWh. Average cost savings were $20 per year. Homes where the fan was used outside of heating and cooling mode saved an additional $42 per year on average. Results indicate that BPM replacement motors will be most cost-effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load. There are millions of cold-climate, U.S. homes that meet these criteria, but the savings in most homes tested in this study were modest.

  18. Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama" Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama" An image from the video with a woman and ...

  19. Satellite Television Industry Meeting Regarding DOE Set-Top Box...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking Satellite Television Industry Meeting Regarding DOE Set-Top Box Rulemaking On April 3, 2012 at 11:00 AM, ...

  20. Prematurely terminated slug tests

    SciTech Connect (OSTI)

    Karasaki, K. )

    1990-07-01

    A solution of the well response to a prematurely terminated slug test (PTST) is presented. The advantages of a PTST over conventional slug tests are discussed. A systematized procedure of a PTST is proposed, where a slug test is terminated in the midpoint of the flow point, and the subsequent shut-in data is recorded and analyzed. This method requires a downhole shut-in device and a pressure transducer, which is no more than the conventional deep-well slug testing. As opposed to slug tests, which are ineffective when a skin is present, more accurate estimate of formation permeability can be made using a PTST. Premature termination also shortens the test duration considerably. Because in most cases no more information is gained by completing a slug test to the end, the author recommends that conventional slug tests be replaced by the premature termination technique. This study is part of an investigation of the feasibility of geologic isolation of nuclear wastes being carried out by the US Department of Energy and the National Cooperative for the Storage of Radioactive Waste of Switzerland.

  1. Shipboard regasification terminal

    SciTech Connect (OSTI)

    Campbell, G.; Zednik, J.

    1999-07-01

    Mobil Technology Company and Mobil Shipping and Transportation Company have jointly developed a new combination of existing proven equipment to regasify LNG. Advantages of this Shipboard Regasification Terminal (SRT) include accelerated initial gas delivery schedule, low capital cost, delivery of smaller quantities of LNG at a competitive price and shorter term of LNG purchase and improved financing options. These advantages benefit both the supplier of LNG and the purchaser. SRT can be used as an interim supply to developing markets allowing the demand to grow while developing downstream infrastructure. This concept does not involve offshore transfer of cryogenic fluids while delivering near-ambient temperature pipeline quality gas at typical pipeline pressures. During times when gas is not required, the SRT ship can easily be returned to the trade of transporting and delivering LNG to conventional land based terminals. This paper will discuss the merits of Shipboard Regasification Terminals in general, cover the development of this concept and review the factors guiding the use of SRT vs. an onshore terminal.

  2. An Improved Method of Manufacturing Corrugated Boxes: Lateral...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 32 ENERGY ... PERFORMANCE; SPECIFICATIONS; TESTING Corrugated Box Construction, Board ...

  3. An Improved Method of Manufacturing Corrugated Boxes: Lateral...

    Office of Scientific and Technical Information (OSTI)

    and crush resistance (per unit of fiber weight) than the conventional box construction. ... AND UTILIZATION; COMMERCIALIZATION; CONSTRUCTION; FIBERS; FLEXIBILITY; LINERS; ...

  4. Oak Ridge Operations PO. Box E

    Office of Legacy Management (LM)

    PO. Box E Oak Ridge,Tennessee 37830 E. 6. DeLaney, DRAP, NE-24 COMPLETION OF DECONTAMINATION OF GILMAN HALL, UNIVERSITY OF CALIFORNIA AT BERKELEY Attached is a copy of the final report covering the remedial actions and associated radiological survey work on Gilman Hall. Your attention is called to the last paragraph of the attached letter from Mr. Davis (SAN) which states: "Completion of this work has fulfilled OR's obligation under the Formerly Utilized Sites Remedial Action Program

  5. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Rulemaking | Department of Energy 7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any

  6. 2015-03-26 Issuance: Fans and Blowers ASRAC Working Group; Notice of Intent

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Issuance: Fans and Blowers ASRAC Working Group; Notice of Intent 2015-03-26 Issuance: Fans and Blowers ASRAC Working Group; Notice of Intent This document is a pre-publication Federal Register Notice of Intent regarding establishment of an ASRAC Working Group for Fans and Blowers, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 26, 2015. Though it is not intended or expected, should any discrepancy occur between the document posted here and

  7. Hunter Fan Company DOE Ex Parte Meeting Memo | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fan Company DOE Ex Parte Meeting Memo Hunter Fan Company DOE Ex Parte Meeting Memo This memo provides a summary of the communications made to the DOE staff regarding proposed rules on ceiling fan test procedures. June 7 Hunter DOE Ex Parte Meeting (120.19 KB) More Documents & Publications Hunter DOE Ex Parte Communication Summary July 30 2015 ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule 2014-09-19 Issuance: Energy

  8. Freeport LNG Terminal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Freeport LNG Terminal Freeport LNG Terminal Freeport LNG Terminal Long-Term Contract Information and Registrations at U.S. LNG Export Facilities Filing Date Type (1) Description ...

  9. Corpus Christi Liquefaction Terminal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Terminal Corpus Christi Liquefaction Terminal Corpus Christi Liquefaction Terminal Long-Term Contract Information and Registrations at U.S. LNG Export Facilities Filing Date Type...

  10. Hydraulic seal battery terminal

    SciTech Connect (OSTI)

    Stadnick, S.J.

    1980-09-23

    A self-sealing battery terminal is described that includes a hydroformed Inconel outer case, a low shear strength sealant material, and a central post in the form of a bolt which acts as both a conductor and transmits the preload from a pair of Belleville washers to a lower ceramic washer. The lower ceramic washer acts like a piston to compress the sealant when the nut on the central post is tightened. The Belleville washers serve to maintain a minimum tension on the central post. A top ceramic washer is held in place by the tension in the central bolt as long as the tension exceeds a minimum value.

  11. Picture of the Week: Glove boxing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Glove boxing In 2000, the U.S. and Russia committed to each "permanently dispose" of "no less than or at least" 34 metric tons of weapons-grade plutonium. The Department of Energy (DOE) announced a strategy for the permanent disposition of U.S. surplus weapons-grade plutonium: convert the energy stored in the nation's stockpile of surplus plutonium pits into electrical power for homes and businesses by burning it as fuel in domestic commercial nuclear reactors. August 7,

  12. Evaluation of Retrofit Variable-Speed Furnace Fan Motors

    SciTech Connect (OSTI)

    Aldrich, R.; Williamson, J.

    2014-01-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) has evaluated the Concept 3™ replacement motors for residential furnaces. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost effectiveness. The project includes eight homes in and near Syracuse, NY. Tests and monitoring was performed both before and after fan motors were replaced. Results indicate that BPM replacement motors will be most cost effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load. There are millions of cold-climate, U.S. homes that meet these criteria, but the savings in most homes tested in this study were modest.

  13. Box Butte County, Nebraska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Box Butte County, Nebraska: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 42.1911471, -103.0817903 Show Map Loading map......

  14. BioFuelBox Corporation | Open Energy Information

    Open Energy Info (EERE)

    Corporation Name: BioFuelBox Corporation Address: 50 Las Colinas Lane Place: San Jose, California Zip: 95119 Region: Bay Area Sector: Biofuels Product: Makes a modular...

  15. A passive margin-type submarine fan complex, Permian Ecca Group, South Africa

    SciTech Connect (OSTI)

    Wickens, H.D. ); Bouma, A.H. )

    1991-03-01

    A submarine fan complex, comprising five arenaceous fan systems separated by basinal shale units, occurs in the southwestern part of the intracratonic Karoo basin in South Africa. Although basin development is related to a subduction zone bordering the palaeo-Pacific ocean to the south of Gondwanaland and the evolution of the Cape Fold Belt, the entire Lower Permian Ecca Group basin-fill succession reflects depositional characteristics of a passive-margin setting. The submarine fan complex, 250 m thick, originated from sediments supplied by Mississippi-type deltas dominating the Ecca coastline. The fine grain-size and low sand/shale ratio of the submarine fan and deltaic deposits reflect the maturity of the ancient river systems. Outcrops of the fan complex are well exposed and cover an area of 650 km{sup 2}. The strata are not affected by folding, and deep erosion allows three-dimensional viewing of mid-fan to outer-fan deposits. Features of interest include stacked lobe deposits displayed along 2.5 km of a 60 m high cliff section, and a transverse cliff section through channel-fill deposits 500 m wide. Paleocurrent directions reveal that each sequence had its own main source area located to the northwest and south of its present geographic location. The cyclic nature of the fan complex is attributed to relative sea-level changes; deposition took place on the basin floor in water depths that do not exceed 500 m. Shoaling of the basin to wave base depths is reflected in the pro-delta and delta front deposits overlying the uppermost fan sequence. Major factors in controlling direction of fan progradation were delta switching and basin floor topography.

  16. Pre-Amp Box Platform Analysis

    SciTech Connect (OSTI)

    Kirby, K.; Kurita, C.; /Fermilab

    1989-01-17

    A platform to be used for the installation and repair of the high voltage pre-amp boxes on the CC cryostat has been designed to support a uniform load of 30 Ibs./sq. ft. However, according to the standards set by both the American National Standard and the Uniform Building Code, the minimum uniformly distributed design load for a structure used as an 'elevated platform or walkway' is 60 lbs./sq. ft. The existing platform was tested with a uniform load of 40 lbs./sq. ft. with no major problems occurring during the testing. Considering a 40 lbs./sq. ft. load to be the minimum acceptable value for 'residential' use, and the platform in hand to be better categorized as an 'elevated platform or walkway', the platform is carefully re-analyzed for a 60 lbs./sq. ft. uniformly distributed load.

  17. A solar box cooker for mass production in East Africa

    SciTech Connect (OSTI)

    Funk, P.A.; Wilcke, W.F.

    1992-12-31

    A solar box cooker produced in Tanzania, East Africa with indigenous materials is described. When compared to a commercially produced glass and cardboard one, it was found to perform as well. Heat transfer through each major component of the cooker is presented. The smallest losses were through the walls of the box. The greatest losses were observed in the cover system.

  18. Reservoir characterization of a Permian Slope Fan/basin-floor fan complex: Cherry Canyon Formation, Ward County, Texas

    SciTech Connect (OSTI)

    Spain, D.R. )

    1990-05-01

    The Cherry Canyon Formation consists of a 925-ft- (280-m) thick section of up to 25 different sandstone and siltstone units that were deposited in a deep-water environment in the Delaware basin. Lowstand sedimentation by fluid density currents with periodic turbidity currents resulted in a broad-migrating channelized slope fan/basin-floor fan complex interpreted to exhibit an intricate reservoir geometry. Thirteen lithofacies are identified. Primary reservoirs are found in massive channel sandstones, and beds of lesser reservoir quality are present in laminated overbank/interchannel sandstones. Original depositional fabric modified by diagenetic cements and authigenic clays created three petrophysical rock types. Type I reservoirs contain intergranular macroporosity relatively free of carbonate cement and authigenic clay. Types II and III reservoirs contain mesoporosity and abundant microporosity created by moderate to abundant carbonate cementation and plugging of pore throats by authigenic grain-coating chlorite and pore-bridging fibrous illite. Depositional and diagenetic factors combine with insufficient oil column height to yield low initial oil saturations that decrease with depth in a hydrocarbon-water transition zone. Mercury injection capillary pressure measurements illustrate the vertical stratification of petrophysical rock types that exist in the section; reservoirs which contain all water are interbedded with reservoirs containing mostly oil. Subsequently, a slight change in height above free water can drive production from all water to all oil. Hydrocarbon column heights greater than 60 ft are required to establish water-free oil production. Accurate reservoir water saturations can be derived using Archie's equation; when combined with a movable oil analysis and drainage relative permeability/fractional flow curves, initial water cuts can be predicted to maximize deliverability.

  19. The design and fabrication of a calibrated hot box apparatus

    SciTech Connect (OSTI)

    Gatland, S.D. II; Goss, W.P.; Curcija, D.

    1997-11-01

    A second generation research calibrated hot box was designed and constructed at the University of Massachusetts`s Building Energy Research Laboratory. The hot box was built to meet the test methodologies specified in the American Society for Testing and Materials (ASTM) Standard Test Methods C 976 for calibrated hot boxes and C 1199 for fenestration system hot box test methods. The hot box has the capability of simulating both parallel and perpendicular weather side wind directions on building assemblies, including fenestration (window and door) systems. The weather side chamber has a temperature range of {minus}23.3 C to 60 C and the room side chamber has a temperature range of 21.1 C to 60 C. The design, fabrication, and instrumentation are described in detail.

  20. Largest Taiwan SPM terminal installed

    SciTech Connect (OSTI)

    Schultz, A.R. )

    1992-02-17

    This paper reports on the largest Taiwan single-point mooring (SPM) terminal. Chinese Petroleum Corp. (CPC) last year installed and commissioned Taiwan's SPM terminal. This, the third of four planned SPM terminals, is unloading 100,000-300,000 dwt crude-oil tankers 5 miles offshore Kaohsiung, Taiwan, on the southwest coast of the Republic of China. Construction on the fourth SPM terminal, for unloading naphtha and diesel gas oil from 20,000 -100,000 dwt tankers, began late last year. The third terminal consists of a catenary anchor leg mooring (CALM) system, a 56-in, (1,422 mm) OD crude-oil pipeline and a 16-in. (406 mm) OD fuel-oil pipeline. The subsea pipelines extend from the CALM installed in a water depth of 118 ft to an existing shore tank farm tie-in valve station.

  1. Measure Guideline: Optimizing the Configuration of Flexible Duct Junction Boxes

    SciTech Connect (OSTI)

    Beach, R.; Burdick, A.

    2014-03-01

    This measure guideline offers additional recommendations to heating, ventilation, and air conditioning (HVAC) system designers for optimizing flexible duct, constant-volume HVAC systems using junction boxes within Air Conditioning Contractors of America (ACCA) Manual D guidance (Rutkowski, H. Manual D -- Residential Duct Systems, 3rd edition, Version 1.00. Arlington, VA: Air Conditioning Contractors of America, 2009.). IBACOS used computational fluid dynamics software to explore and develop guidance to better control the airflow effects of factors that may impact pressure losses within junction boxes among various design configurations (Beach, R., Prahl, D., and Lange, R. CFD Analysis of Flexible Duct Junction Box Design. Golden, CO: National Renewable Energy Laboratory, submitted for publication 2013). These recommendations can help to ensure that a system aligns more closely with the design and the occupants' comfort expectations. Specifically, the recommendations described herein show how to configure a rectangular box with four outlets, a triangular box with three outlets, metal wyes with two outlets, and multiple configurations for more than four outlets. Designers of HVAC systems, contractors who are fabricating junction boxes on site, and anyone using the ACCA Manual D process for sizing duct runs will find this measure guideline invaluable for more accurately minimizing pressure losses when using junction boxes with flexible ducts.

  2. 2015-03-26 Issuance: Fans and Blowers ASRAC Working Group; Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document is being made available through the Internet solely as a means to facilitate the public's access to this document. ASRAC Fans and Blowers Working Group Notice of ...

  3. fan blades Karr, O.F.; Brooks, J.B.; Seay, E. 20 FOSSIL-FUELED...

    Office of Scientific and Technical Information (OSTI)

    draft fan blades Karr, O.F.; Brooks, J.B.; Seay, E. 20 FOSSIL-FUELED POWER PLANTS; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 42 ENGINEERING NOT INCLUDED IN OTHER...

  4. Fan System Optimization Improves Production and Saves Energy at Ash Grove Cement Plant

    SciTech Connect (OSTI)

    2002-05-01

    This case study describes an optimization project implemented on a fan system at Ash Grove Cement Company, which led to annual energy and maintenance savings of $16,000 and 175,000 kilowatt-hours (kWh).

  5. Property:Building/SPBreakdownOfElctrcityUseKwhM2CirculationFans...

    Open Energy Info (EERE)

    eKwhM2CirculationFans" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 13.3422495258 + Sweden Building 05K0002 + 0.0 + Sweden Building...

  6. Engine having hydraulic and fan drive systems using a single high pressure pump

    DOE Patents [OSTI]

    Bartley, Bradley E.; Blass, James R.; Gibson, Dennis H.

    2000-01-01

    An engine comprises a hydraulic system attached to an engine housing that includes a high pressure pump and a hydraulic fluid flowing through at least one passageway. A fan drive system is also attached to the engine housing and includes a hydraulic motor and a fan which can move air over the engine. The hydraulic motor includes an inlet fluidly connected to the at least one passageway.

  7. Stabilization of the fan instability: Electron flux relaxation

    SciTech Connect (OSTI)

    Krafft, C.; Volokitin, A.

    2006-12-15

    This paper presents some relevant simulation results on the interaction between electrostatic waves and suprathermal electron fluxes at anomalous cyclotron and Landau resonances. In particular, the case of a dense and continuous wave spectrum is studied. It is shown that, after the waves excited by the fan instability at anomalous cyclotron resonances have reached a first saturation stage due to particle trapping, the process of 'dynamical resonance merging' takes place, which leads to a strong amplification of the waves' amplitudes. The Landau resonances do not play an essential role in the total energy exchange between the particles and the waves, as they mainly help to smooth the peaks rising during the evolution of the electron parallel velocity distribution and contribute to damping. Moreover, the paper shows that at the asymptotic stage of the interaction, when the waves' amplitudes are saturated and the electron flux is relaxed, some physical features clearly do not fit the predictions of the well-known quasilinear theory. The careful examination of a huge number of trajectories of particles moving in the effective field of the wave packet allows to state that most of the particles involved in the resonant interactions are trapped by several waves simultaneously. In this so-called 'multitrapping' process, the particles perform complex oscillatory motions which are far from what is expected from the quasilinear theory, where the diffusive behavior of the particles in the velocity space results from small successive random steps.

  8. Build a Pizza Box Solar Oven | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Build a Pizza Box Solar Oven Build a Pizza Box Solar Oven Below is information about the student activity/lesson plan from your search. Grades K-4, 5-8, 9-12 Subject Solar Summary Check out this staightforward lesson, that can be adapted for all grade levels, on how to build a solar oven. Curriculum Science, Visual Arts, Language Arts Plan Time One class period Materials One pizza box from a local pizza delivery store, tape, scissors, black construction paper, clear plastic wrap, aluminum foil,

  9. Monroe County Boxing Club | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monroe County Boxing Club Monroe County Boxing Club The mp4 video format is not supported by this browser. Download video Captions: On Time: 4:00 min. Started as the Tellico Boxing Club by Don Eddington and Poke Byers in 1992, the club produced a national Golden Gloves champion. That champion, Jesse Byers, is now the head coach for the club, which now is located in Madisonville, Tennessee. The club covers registration fees for those who cannot afford it, and all equipment, uniforms, and travel

  10. Preliminary Aging Assessment of Nuclear Air-Treatment and Cooling System Fans

    SciTech Connect (OSTI)

    Winegardner,, W. K.

    1995-07-01

    A preliminary aging assessment of the fans used in nuclear air treatment and cooling systems was performed by the Pacific Northwest Laboratory as part of the U.S. Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. Details from guides and standards for the design, testing, and installation of fans; results of failure surveys; and information concerning stressors, related aging mechanisms, and inspection, surveillance, and monitoring methods (ISMM) were compiled. Failure surveys suggest that about half of the failures reported for fans are primarily associated with aging. Aging mechanisms associated with the various fan components and resulting from mechanical, thermal, and environmental stressors include wear, fatigue, corrosion, and erosion of metals and the deterioration of belts and lubricants. A bearing is the component most frequently linked to fan failure. The assessment also suggests that ISMM that will detect irregularities arising from improper lubrication, cooling, alignment, and balance of the various components should aid in counteracting many of the aging effects that could impair fan performance. An expanded program, to define and evaluate the adequacy of current ISMM and maintenance practices and to include a documented Phase I aging assessment, is recommended.

  11. Sabine Pass LNG Terminal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sabine Pass LNG Terminal Sabine Pass LNG Terminal Sabine Pass LNG Terminal Long-Term Contract Information and Registrations at U.S. LNG Export Facilities Filing Date Type (1) ...

  12. Dominion Cove LNG Terminal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Dominion Cove LNG Terminal Dominion Cove LNG Terminal Dominion Cove LNG Terminal Long-Term Contract Information and Registrations at U.S. LNG Export Facilities Filing Date Type (1) ...

  13. GREEN SUPERCOMPUTING IN A DESKTOP BOX

    SciTech Connect (OSTI)

    HSU, CHUNG-HSING; FENG, WU-CHUN; CHING, AVERY

    2007-01-17

    The computer workstation, introduced by Sun Microsystems in 1982, was the tool of choice for scientists and engineers as an interactive computing environment for the development of scientific codes. However, by the mid-1990s, the performance of workstations began to lag behind high-end commodity PCs. This, coupled with the disappearance of BSD-based operating systems in workstations and the emergence of Linux as an open-source operating system for PCs, arguably led to the demise of the workstation as we knew it. Around the same time, computational scientists started to leverage PCs running Linux to create a commodity-based (Beowulf) cluster that provided dedicated computer cycles, i.e., supercomputing for the rest of us, as a cost-effective alternative to large supercomputers, i.e., supercomputing for the few. However, as the cluster movement has matured, with respect to cluster hardware and open-source software, these clusters have become much more like their large-scale supercomputing brethren - a shared (and power-hungry) datacenter resource that must reside in a machine-cooled room in order to operate properly. Consequently, the above observations, when coupled with the ever-increasing performance gap between the PC and cluster supercomputer, provide the motivation for a 'green' desktop supercomputer - a turnkey solution that provides an interactive and parallel computing environment with the approximate form factor of a Sun SPARCstation 1 'pizza box' workstation. In this paper, they present the hardware and software architecture of such a solution as well as its prowess as a developmental platform for parallel codes. In short, imagine a 12-node personal desktop supercomputer that achieves 14 Gflops on Linpack but sips only 185 watts of power at load, resulting in a performance-power ratio that is over 300% better than their reference SMP platform.

  14. Feasibility Study: Ductless Hydronic Distribution Systems with Fan Coil Delivery

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.; Backman, C.

    2012-07-01

    The primary objectives of this study are to estimate potential energy savings relative to conventional ducted air distribution, and to identify equipment requirements, costs, and barriers with a focus on ductless hydronic delivery systems that utilize water-to-air terminal units in each zone. Results indicate that annual heating and cooling energy use can be reduced by up to 27% assuming replacement of the conventional 13 SEER heat pump and coil with a similarly rated air-to-water heat pump.

  15. SECURITY TERMINATION STATEMENT | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    statement in connection with the termination of access authorization (security clearance) granted by the U.S. Department of Energy (DOE). SECURITY TERMINATION STATEMENT ...

  16. Flexible Work Arrangements Go Outside the Box | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Flexible Work Arrangements Go Outside the Box Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) ...

  17. Box Elder County, Utah: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Box Elder County is a county in Utah. Its FIPS County Code is 003. It is classified as...

  18. P.O. Box 117, Oak Ridge, TN 37831

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Box 117, Oak Ridge, TN 37831 g (865) 241-8893 g IVsurveys@orau.org On the Web: www.orau.orgenvironmental-assessments-health-physics Oak Ridge Associated Universities (ORAU) is a...

  19. Box Elder, Montana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. Box Elder is a census-designated place in Chouteau County and Hill County, Montana. It...

  20. Y-12s Moon Box ? a big hit in Texas

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    not rub against anything that would mar its shiny finish. Then off it went to Texas. In planning this trip, I first considered shipping the Moon Box, but I did not want to let it...

  1. Savings Project: Attic Stairs Cover Box | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    closings Have an R-value similar to the rest of the attic insulation Provide an air seal. ... The box should rest squarely on top of the attic stairs frame or on wood stops installed ...

  2. Lab Ahead of Schedule Processing Waste in Large Boxes

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – The TRU Waste Program at Los Alamos National Laboratory is currently two months ahead of schedule processing and repackaging waste stored in large fiberglass-reinforced boxes (FRPs).

  3. Measure Guideline: Optimizing the Configuration of Flexible Duct Junction Boxes

    SciTech Connect (OSTI)

    Beach, R.; Burdick, A.

    2014-03-01

    This measure guideline offers additional recommendations to heating, ventilation, and air conditioning (HVAC) system designers for optimizing flexible duct, constant-volume HVAC systems using junction boxes within Air Conditioning Contractors of America (ACCA) Manual D guidance. IBACOS used computational fluid dynamics software to explore and develop guidance to better control the airflow effects of factors that may impact pressure losses within junction boxes among various design configurations. These recommendations can help to ensure that a system aligns more closely with the design and the occupants' comfort expectations. Specifically, the recommendations described herein show how to configure a rectangular box with four outlets, a triangular box with three outlets, metal wyes with two outlets, and multiple configurations for more than four outlets. Designers of HVAC systems, contractors who are fabricating junction boxes on site, and anyone using the ACCA Manual D process for sizing duct runs will find this measure guideline invaluable for more accurately minimizing pressure losses when using junction boxes with flexible ducts.

  4. Characteristics of some submarine fan channels, Permian Ecca Group, South Africa

    SciTech Connect (OSTI)

    Bouma, A.H. ); Dev Wickens, H. )

    1991-03-01

    The vary well exposed submarine fan complex in the southwestern part of the Karoo basin permits close examination of channel-fills and in places their associated overbank deposits. The complex comprises five arenaceous fan systems some of which attain 60 m in thickness. The fans are vertically stacked and separated by basinal shale deposits; each system with its own direction of growth. The association of channelized sandstone bodies and thin-bedded sandstone and shale packages in an updip position from predominantly stacked lobe deposits suggest preservation of middle fan settings. A 500 m wide, 20 m thick channel-fill consisting massive amalgamated sandstone beds occupying the channel thalweg occurs in a setting dominated by thin-bedded, ripple-laminated sandstone and shale. Gradual thinning of the channel-fill beds toward the channel edges, lack of internal lateral accretion, and a high width to depth ratio suggests a low sinuous to straight channel. The channel-fill is capped by an abandonment facies characterized by ripple-laminated sandstone and shale. Stacked, laterally offset channel-fill deposits with highly erosional contacts and typical well-bedded overbank deposits form channel-overbank complexes and characterize the mid-fan region of the uppermost fan system. Palaeocurrent directions and gradual diminishing of bed-thickness away from the generally massively bedded, amalgamated channel-fill sandstones confirm a simultaneous channel/overbank origin for these deposits. Levee morphology has not been recognized. Both examples of channel-fills cited reveal part of the complexity of the channelized portions of submarine fans and hence the implications thereof in exploring for hydrocarbon reservoirs.

  5. Facies architecture of Spraberry submarine fan reservoirs (Permian), Midland basin, Texas

    SciTech Connect (OSTI)

    Guevara, E.H.; Tyler, N.

    1989-03-01

    Facies of mud-rich submarine fans of the Spraberry formation (Permian, Leonardian) form oil reservoirs in the central part of the Midland basin, west Texas. The principal reservoirs are submarine-channel and associated facies in the upper parts of generally upward-coarsening and upward-thickening sequences of the Jo Mill (lower Spraberry) and Driver and overlying Floyd (upper Spraberry) fans. They are naturally fractured, massive and laminated, very fine-grained, calcareous sandstones and siltstones usually occurring in beds 2 to approximately 12 ft thick. Two main subdivisions, inner and middle to outer fan, are recognized using isoliths, log motifs, and cores of predominantly terrigenous clastic, mostly basin-wide genetic intervals. The boundary between the subdivisions approximately coincides with the location of the subjacent Horseshoe atoll (Pennsylvanian). The narrow range in grain size of the fans results in limited basinward variations in texture and sedimentary structures and paucity of Bouma sequences. Facies architecture strongly influences hydrocarbon distribution and recovery. Wells having the best cumulative productions generally occur in sandstone depositional axes. Most accumulations in inner fan facies are scattered structural traps having relatively high recovery efficiencies (24%, Jo Mill field). The largest accumulations in mid to outer fan facies are stratigraphic traps in meandering to anastomosing channel sandstone belts 1-3 mi wide occurring in a widespread area. Recovery efficiencies range from 5% (Spraberry trend, stratigraphic trap) to 15% (Benedum field, combined stratigraphic-structural trap). Additional reserves can be recovered from partly drained and untapped reservoir compartments, especially in layered and compartmentalized middle to outer fan facies.

  6. PIA - DOE OCIO, Open Government Plan Comment Box | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE OCIO, Open Government Plan Comment Box PIA - DOE OCIO, Open Government Plan Comment Box PIA - DOE OCIO, Open Government Plan Comment Box PIA - DOE OCIO, Open Government Plan Comment Box (2.94 MB) More Documents & Publications PIA - HSPD-12 Physical and Logical Access System

  7. LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL

    SciTech Connect (OSTI)

    P.C. Weaver

    2010-10-22

    5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

  8. Computational Fluid Dynamics Analysis of Flexible Duct Junction Box Design

    SciTech Connect (OSTI)

    Beach, Robert; Prahl, Duncan; Lange, Rich

    2013-12-01

    IBACOS explored the relationships between pressure and physical configurations of flexible duct junction boxes by using computational fluid dynamics (CFD) simulations to predict individual box parameters and total system pressure, thereby ensuring improved HVAC performance. Current Air Conditioning Contractors of America (ACCA) guidance (Group 11, Appendix 3, ACCA Manual D, Rutkowski 2009) allows for unconstrained variation in the number of takeoffs, box sizes, and takeoff locations. The only variables currently used in selecting an equivalent length (EL) are velocity of air in the duct and friction rate, given the first takeoff is located at least twice its diameter away from the inlet. This condition does not account for other factors impacting pressure loss across these types of fittings. For each simulation, the IBACOS team converted pressure loss within a box to an EL to compare variation in ACCA Manual D guidance to the simulated variation. IBACOS chose cases to represent flows reasonably correlating to flows typically encountered in the field and analyzed differences in total pressure due to increases in number and location of takeoffs, box dimensions, and velocity of air, and whether an entrance fitting is included. The team also calculated additional balancing losses for all cases due to discrepancies between intended outlet flows and natural flow splits created by the fitting. In certain asymmetrical cases, the balancing losses were significantly higher than symmetrical cases where the natural splits were close to the targets. Thus, IBACOS has shown additional design constraints that can ensure better system performance.

  9. Asymmetrical-fan tranmission CT on SPECT to derive {mu}-maps for attenuation correction

    SciTech Connect (OSTI)

    Loncaric, S.; Huang, G.; Ni, B. [Rush-Presbyterian-St. Luke`s Medical Center, Chicago, IL (United States)] [and others

    1994-05-01

    For proper attenuation correction of SPECT images, an appropriate {mu}-map properly registered with each imaging slices is needed. Among the many techniques for {mu}-map derivation, simultaneous or sequential fan-beam transmission CT (TCT), on the same SPECT system with the same acquisition settings, have advantages of being practical while ensuring registration. However, the problems are: (1) limited FOV for thoracic imaging, projection would be truncated with a typical size detector, (2) lack of room for placing the transmission source in many SPECT systems. We have developed a new sampling scheme to solve the problems mentioned above. This scheme uses an asymmetrical-fan geometry (AFG), which samples only half of the field, the other half would be sampled after an 180{degrees} detector rotation. This technique completes the minimum sampling requirement in a 360{degrees} detector rotation and yields a relatively large FOV defined by the outside edge of the sampling fan. We have confirmed the feasibility of the AFG sampling on a 3-head SPECT system to provide a large FOV for TCT of most patient. The TCT sampling scheme is achieved with an asymmetrical-fan collimator. We have developed the required new reconstruction algorithms and derived excellent reconstructed images of phantoms and human subjects. We propose to have this technique implemented in a short and fast transmission scan in a multi-head SPECT system, after emission imaging, because the detectors have to be pulled out to make room for the transmission source. The imaging field can even exceed the full field size of the detector. MS would be possible when an obtuse sampling fan is formed by shifting the source outward further, provided the central FOV is properly covered with a supplementary sampling scheme, e.g., using another TCT with a fan-beam collimator on another one of the detectors.

  10. REMOTE REFURBISHMENT OF THE METALLOGRAPHY PREPARATION BOX AT THE INL

    SciTech Connect (OSTI)

    Adam B. Robinson; R. Paul Lind

    2010-09-01

    One of the most utilized hot cell capabilities at the Idaho National Laboratory is referred to as the containment box. This is where all destructive examination samples are prepared for analysis. This one window box is contained within the much larger Hot Fuels Examination Facility which consists of a 21x10x8 meter hot cell with an inert argon atmosphere. The refurbishment of this box entailed removing of all sample preparation equipment and support systems, as well as the design and installation of new preparation equipment. The new equipment consists of low and high speed saws, grinding and polishing equipment, water recirculation systems, and sample storage units. This paper includes the details of this refurbishment.

  11. Ex Parte discussion of commercial fan and blower rulemaking | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy discussion of commercial fan and blower rulemaking Ex Parte discussion of commercial fan and blower rulemaking On November 3rd, Jordan Doria, Manager of Stakeholder Engagement, Ingersoll Rand, convened a teleconference with John Cymbalsky and Daniel Cohen of DOE. IR_ex_parte_discussion_3NOV2014 (101.77 KB) More Documents & Publications Meeting Summary Memo Ex Parte Communications, Docket Number EERE-2008-BT-STD-0005, RIN 1904-AB57 ASE/CAGI Meeting about Compressors and Compressed

  12. First NESAP Post-doc Takes on BoxLib

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First NESAP Post-doc Takes on BoxLib First NESAP Post-doc Takes on BoxLib Brian Friesen to Work with Ann Almgren's Group in CCSE June 22, 2015 brianfriesenphoto Brian Friesen, PhD The first of eight post-doctoral researchers participating in the NERSC Exascale Science Applications Program (NESAP) is now working full time at NERSC. Brian Friesen, a graduate student in computational astrophysics at the University of Oklahoma, joined the NESAP team May 18. He's been assigned to Ann Almgren's group

  13. Clothes Dryer Automatic Termination Evaluation

    SciTech Connect (OSTI)

    TeGrotenhuis, Ward E.

    2014-10-01

    Volume 2: Improved Sensor and Control Designs Many residential clothes dryers on the market today provide automatic cycles that are intended to stop when the clothes are dry, as determined by the final remaining moisture content (RMC). However, testing of automatic termination cycles has shown that many dryers are susceptible to over-drying of loads, leading to excess energy consumption. In particular, tests performed using the DOE Test Procedure in Appendix D2 of 10 CFR 430 subpart B have shown that as much as 62% of the energy used in a cycle may be from over-drying. Volume 1 of this report shows an average of 20% excess energy from over-drying when running automatic cycles with various load compositions and dryer settings. Consequently, improving automatic termination sensors and algorithms has the potential for substantial energy savings in the U.S.

  14. MEANS FOR TERMINATING NUCLEAR REACTIONS

    DOE Patents [OSTI]

    Cooper, C.M.

    1959-02-17

    An apparatus is presented for use in a reactor of the heterogeneous, fluid cooled type for the purpose of quickly terminating the reaction, the coolant being circulated through coolant tubes extending through the reactor core. Several of the tubes in the critical region are connected through valves to a tank containing a poisoning fluid having a high neutron capture crosssection and to a reservoir. When it is desired to quickly terminate the reaction, the valves are operated to permit the flow of the poisoning fluid through these particular tubes and into the reservoir while normal coolant is being circulated through the remaining tubes. The apparatus is designed to prevent contamination of the primary coolant by the poisoning fluid.

  15. ISSUANCE 2015-08-21: Energy Efficiency Program for Commercial and Industrial Equipment: Notice of Open Meetings for the Fans and Blowers Working Group

    Broader source: Energy.gov [DOE]

    Energy Efficiency Program for Commercial and Industrial Equipment: Notice of Open Meetings for the Fans and Blowers Working Group

  16. Modeling of RTF Glove-Box and Stripper System

    SciTech Connect (OSTI)

    Hsu, R.H.

    2001-03-28

    The glove box-stripper system for the Replacement Tritium Facility (RTF) has been modeled to determine its steady-state performance. To permit comparison, simulations of modified cases were compared with a standard or base case. This paper discusses tests conducted, results obtained and makes recommendations.

  17. Energy Savings Assessment for Digital-to-Analog Converter Boxes

    SciTech Connect (OSTI)

    Cheung, Hoi Ying Iris; Meier, Alan; Brown, Richard

    2011-01-18

    The Digital Television (DTV) Converter Box Coupon Program was administered by the U.S. government to subsidize purchases of digital-to-analog converter boxes, with up to two $40 coupons for each eligible household. In order to qualify as Coupon Eligible Converter Boxes (CECBs), these devices had to meet a number of minimum performance specifications, including energy efficiency standards. The Energy Star Program also established voluntary energy efficiency specifications that are more stringent than the CECB requirements. In this study, we measured the power and energy consumptions for a sample of 12 CECBs (including 6 Energy Star labeled models) in-use in homes and estimated aggregate energy savings produced by the energy efficiency policies. Based on the 35 million coupons redeemed through the end of the program, our analysis indicates that between 2500 and 3700 GWh per year are saved as a result of the energy efficiency policies implemented on digital-to-analog converter boxes. The energy savings generated are equivalent to the annual electricity use of 280,000 average US homes.

  18. Comparison of test particle acceleration in torsional spine and fan reconnection regimes

    SciTech Connect (OSTI)

    Hosseinpour, M. Mehdizade, M.; Mohammadi, M. A.

    2014-10-15

    Magnetic reconnection is a common phenomenon taking place in astrophysical and space plasmas, especially in solar flares which are rich sources of highly energetic particles. Torsional spine and fan reconnections are important mechanisms proposed for steady-state three-dimensional null-point reconnection. By using the magnetic and electric fields for these regimes, we numerically investigate the features of test particle acceleration in both regimes with input parameters for the solar corona. By comparison, torsional spine reconnection is found to be more efficient than torsional fan reconnection in an acceleration of a proton to a high kinetic energy. A proton can gain as high as 100?MeV of relativistic kinetic energy within only a few milliseconds. Moreover, in torsional spine reconnection, an accelerated particle can escape either along the spine axis or on the fan plane depending on its injection position. However, in torsional fan reconnection, the particle is only allowed to accelerate along the spine axis. In addition, in both regimes, the particle's trajectory and final kinetic energy depend on the injection position but adopting either spatially uniform or non-uniform localized plasma resistivity does not much influence the features of trajectory.

  19. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Office of Energy Efficiency and Renewable Energy (EERE)

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  20. Turning on the Fan and Turning off the A/C

    Broader source: Energy.gov [DOE]

    As part of some recent money- and energy-savings improvements I've been making to my home, a couple of weeks ago I installed a ceiling fan in my main living room. Part of my research led me to...

  1. Income Tax Deduction for Solar-Powered Roof Vents or Fans

    Broader source: Energy.gov [DOE]

    The taxpayer must provide proof of the taxpayer’s costs for installation of a solar powered roof vent or fan and a list of the persons or corporations that supplied labor or materials for the solar...

  2. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in...

  3. V-189: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users Deny Service on the Target Host V-189: Oracle VirtualBox 'tracepath' Bug Lets Local Guest Users Deny Service on the Target...

  4. Technology Solutions Case Study: New Insights for Improving the Designs of Flexible Duct Junction Boxes

    SciTech Connect (OSTI)

    2014-01-01

    In this project, IBACOS explored the relationships between pressure and physical configurations of flexible duct junction boxes by using computational fluid dynamics simulations to predict individual box parameters and total system pressure, thereby ensuring improved HVAC performance.

  5. Safeguards Approaches for Black Box Processes or Facilities

    SciTech Connect (OSTI)

    Diaz-Marcano, Helly; Gitau, Ernest TN; Hockert, John; Miller, Erin; Wylie, Joann

    2013-09-25

    The objective of this study is to determine whether a safeguards approach can be developed for “black box” processes or facilities. These are facilities where a State or operator may limit IAEA access to specific processes or portions of a facility; in other cases, the IAEA may be prohibited access to the entire facility. The determination of whether a black box process or facility is safeguardable is dependent upon the details of the process type, design, and layout; the specific limitations on inspector access; and the restrictions placed upon the design information that can be provided to the IAEA. This analysis identified the necessary conditions for safeguardability of black box processes and facilities.

  6. A novel advanced box-type solar cooker

    SciTech Connect (OSTI)

    Grupp, M.; Montagne, P.; Wackernagel, M. )

    1991-01-01

    An advanced version of the box-type solar cooker is presented: a fixed cooking vessel in good thermal contact with a conductive absorber plate is set into the glazing; the results are improved thermal performance, easier access to the cooking vessel and less frequent maintenance due to protection of all absorbing and reflecting surfaces. Outdoor tests show that 5 liters of water per sq m of opening surface can be brought to full boiling in less than one hour. A finite element simulation model of the advanced box cooker is presented. It is shown that the most decisive parameters are absorber-to-pot heat transfer and absorber conductivity. Field tests in Ethiopia and India are under way, local production in India has started.

  7. National Nuclear Security Administration P. O. Box 5400

    National Nuclear Security Administration (NNSA)

    Department of Energy National Nuclear Security Administration P. O. Box 5400 Albuquerque, NM 87185 September 22, 2015 Prospective Offerors: The Department of Energy, National Nuclear Security Administration (DOE/NNSA) is providing the draft Request for Proposal (RFP) entitled. "Design, Integration, Construction, Communication and Engineering 2" (DICCE2), Solicitation Number DE-SOL-0008449, for the purpose of obtaining information, through communications with industry, to assist the

  8. Box Canyon Model Watershed Project : Annual Report 1997/1998.

    SciTech Connect (OSTI)

    Kalispel Natural Resource Department

    1998-01-01

    In 1997, the Kalispel Natural Resource Department (KNRD) initiated the Box Canyon Watershed Project. This project will concentrate on watershed protection and enhancement from an upland perspective and will complement current instream restoration efforts implemented through the Kalispel Resident Fish Project. Primary focus of this project is the Cee Cee Ah Creek watershed due to its proximity to the Reservation, importance as a traditional fishery, and potential for bull trout and west-slope cutthroat trout recovery.

  9. Carlsbad Field Office P. O. Box 3090 Carlsbad

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ergy Carlsbad Field Office P. O. Box 3090 Carlsbad , New Mexico 88221 APR 0 8 2013 Mr. John E. Kieling, Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Building 1 Santa Fe, New Mexico 87505-6303 Subject: Notification of Class 2 Permit Modification Request to th e Waste Isolation Pilot Plant Hazardous Waste Facility Permit Number: NM4890 139088-TS DF Dear Mr. Kieling : Enclosed is the following Class 2 Permit Modification Request: * Modify Excluded Waste

  10. Design of petroleum products terminal wastewater systems

    SciTech Connect (OSTI)

    Klock, B.

    1995-12-31

    Petroleum products terminals, used in conjunction with transportation operations to accomplish the flow of products from their source in refineries down to the consumers, are relatively simple facilities comprising product storage, the means for connecting storage to transportation operations, and other operations to support those functions. Although wastewater generation at terminals is relatively minor, increasingly strict regulation of wastewater from even minor sources is making it more critical that terminal wastewater handling, treatment, and disposal be understood and optimized to ensure that effective wastewater treatment is accomplished at reasonable cost. Anticipating the increased demands on terminal wastewater handling, the API Marketing Terminal Effluent Task Force has sponsored a number of studies to characterize wastewater at terminals and to develop practical means for treating the water. In addition, the Task Force sponsored Texaco`s writing of the report on which this paper is based, API 4602, Minimization, Handling, Treatment, and Disposal of Petroleum Products Terminal Wastewaters. This paper highlights some of the key recommendations in the report, which are: (1) begin characterizing the terminal`s tank bottoms water flow and quality as soon as possible; (2) determine the optimum wastewater disposal option; (3) for most situations, segregate stormwater from contaminated water; (4) if wastewater is treated, use a collection tank to equalize the flow and concentration of tank bottoms water; (5) if wastewater is hauled off to a disposal company, consider removing benzene first; and (6) minimize the use of detergents in the terminal.

  11. System and method for changing a glove attached to a glove box

    DOE Patents [OSTI]

    Aluisi, Alan

    2001-01-01

    A system for changing the gloves of a glove box. The system requires the use of a new glove and a glove change ring to form a temporary secondary barrier to the exchange of atmospheres between the inner glove box and the room in which the glove box is operated. The system describes specific means for disengaging a used glove from the glove box port. The means for disengaging the used glove include use of a glove change hook and use of a glove with an attached tab for use in removal. A method for changing the gloves of a glove box is also described.

  12. Two terminal micropower radar sensor

    DOE Patents [OSTI]

    McEwan, T.E.

    1995-11-07

    A simple, low power ultra-wideband radar motion sensor/switch configuration connects a power source and load to ground. The switch is connected to and controlled by the signal output of a radar motion sensor. The power input of the motion sensor is connected to the load through a diode which conducts power to the motion sensor when the switch is open. A storage capacitor or rechargeable battery is connected to the power input of the motion sensor. The storage capacitor or battery is charged when the switch is open and powers the motion sensor when the switch is closed. The motion sensor and switch are connected between the same two terminals between the source/load and ground. 3 figs.

  13. Two terminal micropower radar sensor

    DOE Patents [OSTI]

    McEwan, Thomas E.

    1995-01-01

    A simple, low power ultra-wideband radar motion sensor/switch configuration connects a power source and load to ground. The switch is connected to and controlled by the signal output of a radar motion sensor. The power input of the motion sensor is connected to the load through a diode which conducts power to the motion sensor when the switch is open. A storage capacitor or rechargeable battery is connected to the power input of the motion sensor. The storage capacitor or battery is charged when the switch is open and powers the motion sensor when the switch is closed. The motion sensor and switch are connected between the same two terminals between the source/load and ground.

  14. HEPA Filter Differential Pressure Fan Interlock System Functional Requirements and Technical Design Criteria

    SciTech Connect (OSTI)

    TUCK, J.A.

    2000-05-11

    Double-shell tanks (DSTs) and Double Contained Receiver Tanks (DCRTs) are actively ventilated, along with certain single-shell tanks (SSTs) and other RPP facilities. The exhaust air stream on a typical primary ventilation system is drawn through two stages of high-efficiency particulate air (HEPA) filtration to ensure confinement of airborne radioactive materials. Active ventilation exhaust stacks require a stack CAM interlock to detect releases from postulated accidents, and to shut down the exhaust fan when high radiation levels are detected in the stack airstream. The stack CAM interlock is credited as a mitigating control to stop continued unfiltered radiological and toxicological discharges from the stack, which may result from an accident involving failure of a HEPA filter. This document defines the initial technical design baseline for a HEPA filter AP fan interlock system.

  15. Economic Recovery of Oil Trapped at Fan Margins Using High Angle Wells and Multiple Hydraulic Fractures

    SciTech Connect (OSTI)

    Mike L. Laue

    1997-05-30

    The distal fan margin in the northeast portion of the Yowlumne field contains significant reserves but is not economical to develop using vertical wells. Numerous interbedded shales and deteriorating rock properties limit producibility. In addition, extreme depths (13,000 ft) present a challenging environment for hydraulic fracturing and artificial lift. Lastly, a mature waterflood increases risk because of the uncertainty with size and location of flood fronts. This project attempts to demonstrate the effectiveness of exploiting the distal fan margin of this slope-basin clastic reservoir through the use of a high-angle well completed with multiple hydraulic-fracture treatments. The combination of a high-angle (or horizontal) well and hydraulic fracturing will allow greater pay exposure than can be achieved with conventional vertical wells while maintaining vertical communication between thin interbedded layers and the wellbore. The equivalent production rate and reserves of three vertical wells are anticipated at one-half to two-thirds the cost.

  16. New Whole-House Solutions Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania

    SciTech Connect (OSTI)

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania, to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. The team evaluated a market-available through-wall air transfer fan system that provides air to the bedrooms.The relative ability of this system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability.

  17. Design, testing and two-dimensional flow modeling of a multiple-disk fan

    SciTech Connect (OSTI)

    Engin, Tahsin; Oezdemir, Mustafa; Cesmeci, Sevki

    2009-11-15

    A multiple-disk Tesla type fan has been designed, tested and analyzed two-dimensionally using the conservation of angular momentum principle. Experimental results showed that such multiple-disk fans exhibited exceptionally low performance characteristics, which could be attributed to the low viscosity, tangential nature of the flow, and large mechanical energy losses at both suction and discharge sections that are comparable to the total input power. By means of theoretical analysis, local and overall shearing stresses on the disk surfaces have been determined based on tangential and radial velocity distributions of the air flow of different volume flow rates at prescribed disk spaces and rotational speeds. Then the total power transmitted by rotating disks to air flow, and the power acquired by the air flow in the gap due to transfer of angular momentum have been obtained by numerically integrating shearing stresses over the disk surfaces. Using the measured shaft and hydraulic powers, these quantities were utilized to evaluate mechanical energy losses associated with the suction and discharge sections of the fan. (author)

  18. Experimental optimization of cooling-tower-fan control based on field data. Master's thesis

    SciTech Connect (OSTI)

    Herman, D.L.

    1991-04-01

    Energy costs continue to play an important role in the decision-making process for building design and operation. Since the chiller, cooling tower fans, and associated pumps consume the largest fraction of energy in a heating, ventilating, and air-conditioning (HVAC) system, the control of these components is of major importance in determining building energy use. A significant control parameter for the chilled water system is the minimum entering condenser water set point temperature at which the cooling tower fans are cycled on and off, several studies have attempted to determine the optimum value for this minimum set point temperature, but direct measurements are not available to validate these studies. The purpose of this study was to experimentally determine the optimum minimum entering condenser water set point temperature from field data based on minimum energy consumption and to validate a chilled water system analytical model previously developed in earlier work. The total chiller system electrical consumption (chiller and cooling tower fan energy) was measured for four entering condensor water set point temperatures (70, 75, 80, and 85 deg F). The field results were compared to results obtained using an analytical model previously developed in a thesis entitled Optimized Design of a Commercial Building Chiller/Cooling Tower System, written by Joyce.

  19. Isolated Fungal Promoters and Gene Transcription Terminators...

    Office of Scientific and Technical Information (OSTI)

    The present invention encompasses isolated gene regulatory elements and gene transcription terminators that are differentially expressed in a native fungus exhibiting a first ...

  20. Runjob termination | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Transfer Debugging & Profiling Allinea DDT Core File Settings Determining Memory Use Using VNC with a Debugger bgqstack gdb Coreprocessor Runjob termination TotalView...

  1. Economic Recovery of Oil Trapped at Fan Margins Using Hig Angle Wells Multiple Hydraulic Fractures

    SciTech Connect (OSTI)

    Laue, M.L.

    1997-11-21

    The Yowlumne field is a giant field in the southern San Joaquin basin, Kern County, California. It is a deep (13,000 ft) waterflood operation that produces from the Miocene- aged Stevens Sand. The reservoir is interpreted as a layered, fan-shaped, prograding turbidite complex containing several lobe-shaped sand bodies that represent distinct flow units. A high ultimate recovery factor is expected, yet significant quantities of undrained oil remain at the fan margins. The fan margins are not economic to develop using vertical wells because of thinning pay, deteriorating rock quality, and depth. This project attempts to demonstrate the effectiveness of exploiting the northeast distal fan margin through the use of a high- angle well completed with multiple hydraulic- fracture treatments. A high-angle well offers greater pay exposure than can be achieved with a vertical well. Hydraulic-fracture treatments will establish vertical communication between thin interbedded layers and the wellbore. The equivalent production rate and reserves of three vertical wells are anticipated at a cost of approximately two vertical wells. The near-horizontal well penetrated the Yowlumne sand; a Stevens sand equivalent, in the distal fan margin in the northeast area of the field. The well was drilled in a predominately westerly direction towards the interior of the field, in the direction of improving rock quality. Drilling and completion operations proved to be very challenging, leading to a number of adjustments to original plans. Hole conditions resulted in obtaining less core material than desired and setting intermediate casing 1200 ft too high. The 7 in. production liner stuck 1000 ft off bottom, requiring a 5 in. liner to be run the rest of the way. The cement job on the 5 in. liner resulted in a very poor bond, which precluded one of three hydraulic fracture treatments originally planned for the well. Openhole logs confirmed most expectations going into the project about basic

  2. Structural and functional analyses of minimal phosphopeptides targeting the polo-box domain of polo-like kinase 1

    SciTech Connect (OSTI)

    Yun, Sang-Moon; Moulaei, Tinoush; Lim, Dan; Bang, Jeong K.; Park, Jung-Eun; Shenoy, Shilpa R.; Liu, Fa; Kang, Young H.; Liao, Chenzhong; Soung, Nak-Kyun; Lee, Sunhee; Yoon, Do-Young; Lim, Yoongho; Lee, Dong-Hee; Otaka, Akira; Appella, Ettore; McMahon, James B.; Nicklaus, Marc C.; Burke, Jr., Terrence R.; Yaffe, Michael B.; Wlodawer, Alexander; Lee, Kyung S.

    2009-09-14

    Polo-like kinase-1 (Plk1) has a pivotal role in cell proliferation and is considered a potential target for anticancer therapy. The noncatalytic polo-box domain (PBD) of Plk1 forms a phosphoepitope binding module for protein-protein interaction. Here, we report the identification of minimal phosphopeptides that specifically interact with the PBD of human PLK1, but not those of the closely related PLK2 and PLK3. Comparative binding studies and analyses of crystal structures of the PLK1 PBD in complex with the minimal phosphopeptides revealed that the C-terminal SpT dipeptide functions as a high-affinity anchor, whereas the N-terminal residues are crucial for providing specificity and affinity to the interaction. Inhibition of the PLK1 PBD by phosphothreonine mimetic peptides was sufficient to induce mitotic arrest and apoptotic cell death. The mode of interaction between the minimal peptide and PBD may provide a template for designing therapeutic agents that target PLK1.

  3. Mobile Nondestructive Assay (NDA) Measurements of Standard Waste Boxes (SWB)

    SciTech Connect (OSTI)

    Mozhayev, Andrey V.; Berg, Randal K.; Haggard, Daniel L.; Hilliard, James R.; Mapili, Gabriel M.

    2006-11-01

    A mobile NDA system was composed and qualified for Safeguards measurements of multiple standard waste boxes (SWB) generated as a result of clean-out activities at Hanford’s Plutonium Finishing Plant (PFP). The system included a neutron slab counter and high purity germanium (HPGe) detector. PC/FRAM software was used to determine the isotopic composition of plutonium residue contained in the waste in order to interpret two independent measurement results provided by total neutron counting and gamma energy analysis (GEA). The measurement procedure developed to estimate transuranic (TRU) content of boxes was based on assumptions about characteristics of the matrix and material distribution. The neutron slab counter was calibrated with various plutonium working standards that were placed in a surrogate SWB specifically made to simulate miscellaneous waste debris. Transmission measurements with a californium source were used to correct for the matrix effects. An In-Situ Object Counting System (ISOCS) was used to acquire spectra from SWBs and ISOCS software was applied to generate the efficiency curve of the HPGe detector. Infinite energy extrapolation was introduced to correct GEA results for self-attenuation. The gamma and neutron results obtained on multiple SWBs are compared and discussed in the paper. Revised measurement positions for the detector and the transmission source are also suggested based on experience gained during the measurements.

  4. A wall and edge guarded hot box for thermal transmittance measurements

    SciTech Connect (OSTI)

    Gatland, S.D. II; Miller, R.G.; Goss, W.P.; Baumgardner, R.L.; Williams, R.G.

    1997-11-01

    A unique guarded hot box designed for thermal testing of fenestration products incorporates several new design concepts from guarded hot plates, namely wall and edge guards, is described in detail. The wall and edge guarded hot box was built to meet the test methodologies specified in the American Society for Testing and Materials (ASTM) Standard Test Methods C 236-89, Standard Test Method for Measuring the Steady-State Thermal Performance of Building Assemblies by Means of a Guarded Hot Box, C 976-90, Standard Test Method for Measuring the Steady-State Thermal Performance of Building Assemblies by Means of a Calibrated Hot Box and C 1199-91, Standard Test Method for Measuring the Steady-State Thermal Transmittance of Fenestration Systems Using Hot Box Methods. Calibration test results for the box wall and specimen frame flanking are presented. Results from calibration transfer standard tests are compared with theoretical calculations and discussed.

  5. Tritium stripping in a nitrogen glove box using palladium/zeolite and SAES St 198{trademark}

    SciTech Connect (OSTI)

    Klien, J.E.; Wermer, J.R.

    1995-01-01

    Glove box clean-up experiments were conducted in a nitrogen glove box using palladium deposited on zeolite (Pd/z) and a SAES St 198{trademark} getter as tritium stripping materials. Protium/deuterium samples spiked with tritium were released into a 620 liter glove box to simulate tritium releases in a 10,500 liter glove box. The Pd/z and the SAES St 198{trademark} stripper beds produced a reduction in tritium activity of approximately two to three orders of magnitude and glove box clean-up was limited by a persistent background tritium activity level. Attempts to significantly reduce the glove box activity to lower levels without purging were unsuccessful.

  6. Tritium stripping in a nitrogen glove box using palladium/zeolite and SAES St 198

    SciTech Connect (OSTI)

    Klein, J.E.; Wermer, J.R.

    1995-10-01

    Glove box clean-up experiments were conducted in a nitrogen glove box using palladium deposited on zeolite (Pd/z) and a SAES St 198 getter as tritium stripping materials. Protium/deuterium samples spiked with tritium were released into a 620 liter glove box to simulate tritium releases in a 10,500 liter glove box. The Pd/z and the SAES St 198 stripper beds produced a reduction in tritium activity of approximately two to three orders of magnitude and glove box clean-up was limited by a persistent background tritium activity level. Attempts to significantly reduce the glove box activity to lower levels without purging were unsuccessful. 3 refs., 6 figs., 1 tab.

  7. Corpus Christi Liquefaction Terminal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corpus Christi Liquefaction Terminal Corpus Christi Liquefaction Terminal Corpus Christi Liquefaction Terminal Long-Term Contract Information and Registrations at U.S. LNG Export Facilities Filing Date Type (1) Description 06/10/15 C (LNG) In the Matter of Cheniere Marketing, LLC and Corpus Christi Liquefaction, LLC FE Docket Nos. 12-97-LNG and 12-99-LNG DOE/FE Order Nos. 3164, 3164-A and 3638 Long-Term Contracts 08/21/15 C (LNG) In the Matter of Cheniere Marketing, LLC and Corpus Christi

  8. Idle hands: New and improved IdleBox tool to aid in reduction of idling |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne National Laboratory Idle hands: New and improved IdleBox tool to aid in reduction of idling Mississippi State University EcoCAR 3 team members help conduct an IdleBox campaign at New Hope Middle School in Columbus, Mississippi. Mississippi State University EcoCAR 3 team members help conduct an IdleBox campaign at New Hope Middle School in Columbus, Mississippi. Idle hands: New and improved IdleBox tool to aid in reduction of idling By Scott Jones * July 25, 2016 Tweet EmailPrint The

  9. Ex Parte Memorandum on Set Top Boxes and Network Equipment | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy on Set Top Boxes and Network Equipment Ex Parte Memorandum on Set Top Boxes and Network Equipment This Memorandum for the Record provides a summary of a May 1, 2012, meeting with DOE officials concerning potential test procedures and energy conservation standards for set-top boxes and network equipment. Meeting_of_05_01_2012.pdf (102.67 KB) More Documents & Publications Docket No. EERE-2012-BT-TP-0046 Ex Parte Communication DOE's Proposed Coverage Determination for Set-Top Boxes

  10. Microsoft Word - DOE-CBFO-01-1006-NDA Box PDP Plan-Revision 5...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the ... PDP Plan February 2015 3 Performance Demonstration Program Plan for Nondestructive Assay ...

  11. Science on Saturday attracts science fans of all ages | Princeton Plasma

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics Lab Science on Saturday attracts science fans of all ages By Jeanne Jackson DeVoe January 28, 2013 Tweet Widget Google Plus One Share on Facebook Joshua E. G. Peek, a Hubble Fellow at Columbia University's Department of Astronomy and son of PPPL physicist and former director Robert Goldston, discusses "Outer Space!" (Photo by Elle Starkman/PPPL Office of Communications) Joshua E. G. Peek, a Hubble Fellow at Columbia University's Department of Astronomy and son of PPPL

  12. Building America Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. Four air-based HVAC distribution systems were assessed:-a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  13. Modeling of cable terminations with embedded electrodes

    SciTech Connect (OSTI)

    Nikolajevic, S.V.; Pekaric-Nadj, N.M.; Dimitrijevic, R.M.; Djurovic, M.

    1996-12-31

    The paper describes a study of various cable termination constructions for medium voltage cross-linked polyethylene (MV XLPE) cables. A special device was used for electrical field measurements around the cable termination, which made it possible to monitor how stress relief materials with different relative permittivity, thickness of stress relief layer and placement of isolated or grounding embedded electrodes (EE) affect electrical stress grading. The results of measurement for each construction were examined by mathematical modeling based on finite element method (FEM). Also, the influence of dielectric losses in the termination was considered, when relative permittivity of the stress relief material is high. Finally, the selected constructions of cable termination were tested in service conditions with load cycling.

  14. PCs and Computer Terminals in Commercial Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    thousand users would be much lower. The more PCs and computer terminals used in a given building, the greater the impact on the building's energy consumption. By this measure,...

  15. FULLY CONVECTIVE MAGNETOROTATIONAL TURBULENCE IN STRATIFIED SHEARING BOXES

    SciTech Connect (OSTI)

    Bodo, G.; Rossi, P.; Cattaneo, F.; Mignone, A.

    2013-07-10

    We present a numerical study of turbulence and dynamo action in stratified shearing boxes with zero magnetic flux. We assume that the fluid obeys the perfect gas law and has finite (constant) thermal diffusivity. We choose radiative boundary conditions at the vertical boundaries in which the heat flux is proportional to the fourth power of the temperature. We compare the results with the corresponding cases in which fixed temperature boundary conditions are applied. The most notable result is that the formation of a fully convective state in which the density is nearly constant as a function of height and the heat is transported to the upper and lower boundaries by overturning motions is robust and persists even in cases with radiative boundary conditions. Interestingly, in the convective regime, although the diffusive transport is negligible, the mean stratification does not relax to an adiabatic state.

  16. Observations of supra-arcade fans: instabilities at the head of reconnection jets

    SciTech Connect (OSTI)

    Innes, D. E.; Guo, L.-J.; Schmit, D.; Bhattacharjee, A.; Huang, Y.-M.

    2014-11-20

    Supra-arcade fans are bright, irregular regions of emission that develop during eruptive flares above flare arcades. The underlying flare arcades are thought to be a consequence of magnetic reconnection along a current sheet in the corona. At the same time, theory predicts plasma jets from the reconnection sites which are extremely difficult to observe directly because of their low densities. It has been suggested that the dark supra-arcade downflows (SADs) seen falling through supra-arcade fans may be low-density jet plasma. The head of a low-density jet directed toward higher-density plasma would be Rayleigh-Taylor unstable, and lead to the development of rapidly growing low- and high-density fingers along the interface. Using Solar Dynamics Observatory/Atmospheric Imaging Assembly 131 images, we show details of SADs seen from three different orientations with respect to the flare arcade and current sheet, and highlight features that have been previously unexplained, such as the splitting of SADs at their heads, but are a natural consequence of instabilities above the arcade. Comparison with three-dimensional magnetohydrodynamic simulations suggests that SADs are the result of secondary instabilities of the Rayleigh-Taylor type in the exhaust of reconnection jets.

  17. Terminating Surface Electromigration at the Source (Journal Article...

    Office of Scientific and Technical Information (OSTI)

    Terminating Surface Electromigration at the Source Title: Terminating Surface Electromigration at the Source Authors: Bevan, Kirk H. ; Zhu, Wenguang ; Guo, Hong ; Zhang, Zhenyu ...

  18. Regulating the ethylene response of a plant by modulation of F-box proteins

    DOE Patents [OSTI]

    Guo, Hongwei; Ecker, Joseph R.

    2010-02-02

    The invention relates to transgenic plants having reduced sensitivity to ethylene as a result of having a recombinant nucleic acid encoding a F-box protein, and a method of producing a transgenic plant with reduced ethylene sensitivity by transforming the plant with a nucleic acid sequence encoding a F-box protein.

  19. Feedthrough terminal for high-power cell

    DOE Patents [OSTI]

    Kaun, T.D.

    1982-05-28

    A feedthrough terminal for a high power electrochemical storage cell providing low resistance coupling to the conductive elements therein while isolating the terminal electrode from the highly corrosive environment within the cell is disclosed. A large diameter, cylindrical copper electrode is enclosed in a stainless steel tube with a BN powder feedthrough seal maintained around the stainless steel tube by means of facing insulative bushings and an outer sleeve. One end of the copper conductor is silver-brazed directly to a flat, butterfly bus bar within the cell, with the adjacent end of the surrounding outer feedthrough sleeve welded to the bus bar. A threaded seal is fixedly positioned on a distal portion of the stainless steel tube immediately adjacent the distal insulative bushing so as to compress the feedthrough seal in tight fitting relation around the stainless steel tube in providing a rugged, leak-proof electrical feedthrough terminal for the power cell.

  20. New Energy Efficiency Standards for Furnace Fans to Reduce Carbon Pollution, Help Americans Save on Energy Bills

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON – As part of President Obama’s Climate Action Plan, the Energy Department today announced a new energy efficiency standard for furnace fans, the latest of eight finalized standards and nine proposed standards issued since the Climate Action Plan was announced last year.

  1. Laboratory evaluation of fan/filter units' aerodynamic and energy performance

    SciTech Connect (OSTI)

    Xu, Tengfang; Jeng, Ming-Shan

    2004-07-27

    The paper discusses the benefits of having a consistent testing method to characterize aerodynamic and energy performance of FFUs. It presents evaluation methods of laboratory-measured performance of ten relatively new, 1220 mm x 610 mm (or 4 ft x 2 ft) fan-filter units (FFUs), and includes results of a set of relevant metrics such as energy performance indices (EPI) based upon the sample FFUs tested. This paper concludes that there are variations in FFUs' performance, and that using a consistent testing and evaluation method can generate compatible and comparable FFU performance information. The paper also suggests that benefits and opportunities exist for our method of testing FFU energy performance to be integrated in future recommended practices.

  2. 3D%20printed%20perforated%20metal%20box.jpg | OSTI, US Dept of Energy

    Office of Scientific and Technical Information (OSTI)

    Office of Scientific and Technical Information 3D%20printed%20perforated%20metal%20box

  3. ChemLabBox for SnifferStars

    Energy Science and Technology Software Center (OSTI)

    2002-01-24

    The software entitled "ChemLabBox for SnifferStars" is used to collect, display, and save data from the Sandia National Laboratories chemical analysis system dubbed SnifferStar. Sensor data is streamed from a SnifferStar unit into a computer thru RS-232 in a manner that is not amendable to plotting. Also, there is no direct way to start and stop the unit as is. This software rearranges the data into something that can be easily plotted in real-time thenmore » saves the data into a text fild. In addition, this software provides the users a means to start and stop the hardware. This software was written specifically for SnifferStar. SnifferStar data is delivered at a very fast rate but for a short period of time. This software is written around that premise. It is written for Pentium or higher machines running Windows 95/98/ME/NT/2000/XP. Lockheed Martin is interested in using it for testing SnifferStar units before deployment. To date they have not indicated their intent to deliver the code either in part or whole as part of their product.« less

  4. WHAT'S INSIDE THE BLACK BOX - EXPLAINING PERFORMANCE ASSESSMENT TO STAKEHOLDERS

    SciTech Connect (OSTI)

    Seitz, R; Elmer Wilhite, E

    2009-01-06

    The performance assessment (PA) process is being applied to support an increasing variety of waste management decisions that involve the whole spectrum of stakeholders. As with many technical tools, the PA process can be seen as a black box, which can be difficult to understand when implemented. Recognizing the increasing use of PA and the concerns about difficulties with understanding, the Savannah River Site Citizens Advisory Board (CAB) made a recommendation that the U.S. Department of Energy (DOE) provide a Public Educational Forum on PAs. The DOE-Headquarters Environmental Management (DOE-EM) Office of Compliance and the DOE-Savannah River (DOE-SR) responded to this recommendation by supporting the Savannah River National Laboratory (SRNL) in developing several presentation modules that can be used to describe different aspects of the PA process. For the Public Educational Forum, the PA modules were combined with presentations on DOE perspectives, historical modeling efforts at the Savannah River Site, and review perspectives from the U.S. Nuclear Regulatory Commission (NRC). The overall goals are to help the public understand how PAs are implemented and the rigor that is applied, and to provide insight into the use of PAs for waste management decision-making.

  5. Electrical wiring box with structure for fast device mounting

    DOE Patents [OSTI]

    Johnston, Earl S.

    1991-01-08

    An electrical wiring box of molded insulating material is provided with bosses having screw holes for receiving a mounting screw that include two colinear portions of which a first portion proximate the front surface has an internal configuration, such as molded threads, that engage the mounting screw while permitting the mounting screw to be manually inserted therethrough without turning because of flexibility built into the boss structure. A second portion of the screw hole is of greater restriction for securely engaging the screw such as by self tapping. The flexibility of the boss is provided by a first center slot that extends from the screw hole to the boss exterior over a length substantially equal to the first portion of the screw hole. Second and third slots are located respectively on each side of the screw hole and provide projections respectively between the first and second slots and the first and third slots that flex to allow easy screw insertion through the first portion of the screw hole.

  6. Environmental aspects of the TROLL terminal design

    SciTech Connect (OSTI)

    Weeks, D.J.

    1996-12-31

    Norway, in common with many countries nowadays, is very protective of its environment. This consciousness and responsibility are reflected by the strict limits on air pollution, in particular noise, and hydrocarbon contaminant levels in discharged water that were imposed for the TROLL terminal design. The capacity of the terminal and the size of its equipment have necessitated new research in the field of noise prediction some of which conflicts with current industry beliefs. This paper discusses some of the engineered solutions to in-plant and community noise abatement and describes the water treatment facilities installed to meet hydrocarbon discharge limits of 5 mg/l.

  7. Transuranic and Low-Level Boxed Waste Form Nondestructive Assay Technology Overview and Assessment

    SciTech Connect (OSTI)

    G. Becker; M. Connolly; M. McIlwain

    1999-02-01

    The Mixed Waste Focus Area (MWFA) identified the need to perform an assessment of the functionality and performance of existing nondestructive assay (NDA) techniques relative to the low-level and transuranic waste inventory packaged in large-volume box-type containers. The primary objectives of this assessment were to: (1) determine the capability of existing boxed waste form NDA technology to comply with applicable waste radiological characterization requirements, (2) determine deficiencies associated with existing boxed waste assay technology implementation strategies, and (3) recommend a path forward for future technology development activities, if required. Based on this assessment, it is recommended that a boxed waste NDA development and demonstration project that expands the existing boxed waste NDA capability to accommodate the indicated deficiency set be implemented. To ensure that technology will be commercially available in a timely fashion, it is recommended this development and demonstration project be directed to the private sector. It is further recommended that the box NDA technology be of an innovative design incorporating sufficient NDA modalities, e.g., passive neutron, gamma, etc., to address the majority of the boxed waste inventory. The overall design should be modular such that subsets of the overall NDA system can be combined in optimal configurations tailored to differing waste types.

  8. METHODOLOGY FOR THE NUMBER OF FILTERS NEEDED IN A WASTE BOX

    SciTech Connect (OSTI)

    MARUSICH, R.M.

    2007-05-17

    Waste in large waste boxes can generate volatile organic compounds (VOCs) and hydrogen. These waste boxes may or may not have flow paths out of them (although it is believed that most do). These boxes will be retrieved, sampled, and then coated with polyurea. After coating, filters will be installed in the box to keep the concentration of VOCs and hydrogen acceptably low. The MDSA requires that a vent path must be protected during application of the polyurea coating. If the box has been sampled then it is vented and the vent path must be protected. This report provides a model in which the user inputs the free volume of the waste box, sample concentration (ppm of total VOC or volume fraction hydrogen) along with the number of filters to be placed into the waste box lid. Using this information, the model provides an estimate of concentration vs. time or the number of filters needed to reduce the concentration by a specified fraction. If the equations from this report are placed into spreadsheets which are then used to demonstrate TSR compliance, the spreadsheets must come under the Software QA Plan for such documents. Chapters 2 and 3 present the theory. Chapter 4 presents the method with examples of its use found in Chapter 5. Chapter 6 provides the basis far the use of 1,000 ppm as the concentration below which the method is valid under any condition.

  9. Regulating the ethylene response of a plant by modulation of F-box proteins

    DOE Patents [OSTI]

    Guo, Hongwei [Beijing, CN; Ecker, Joseph R [Carlsbad, CA

    2014-01-07

    The relationship between F-box proteins and proteins invovled in the ethylene response in plants is described. In particular, F-box proteins may bind to proteins involved in the ethylene response and target them for degradation by the ubiquitin/proteasome pathway. The transcription factor EIN3 is a key transcription factor mediating ethylne-regulated gene expression and morphological responses. EIN3 is degraded through a ubiquitin/proteasome pathway mediated by F-box proteins EBF1 and EBF2. The link between F-box proteins and the ethylene response is a key step in modulating or regulating the response of a plant to ethylene. Described herein are transgenic plants having an altered sensitivity to ethylene, and methods for making transgenic plant haing an althered sensitivity to ethylene by modulating the level of activity of F-box proteins. Methods of altering the ethylene response in a plant by modulating the activity or expression of an F-box protein are described. Also described are methods of identifying compounds that modulate the ethylene response in plants by modulating the level of F-box protein expression or activity.

  10. Sequence stratigraphy and depositional systems of the paleocene submarine fans in the central North Sea: The evolution of a shelf-to-basin system

    SciTech Connect (OSTI)

    Reinsborough, B.C.; Galloway, W.E. )

    1993-09-01

    Slope/basin depositional systems consist of combinations of facies, including slump lobes; chute, flute, and channel fills; mounded turbidite lobes; sheet turbidites; low-density turbidite sheets and fills; hemipelagic drapes; and contourite mounds. Specific facies associations are determined by the nature (point source or linear source) and caliber (volume, grain size, sand:mud) of sediment supply to the slope. The extensive well-log, seismic, and core database was used to dissect the stratal and facies architecture of the Andrew depositional system and characterize a logical evolution of the sand-rich shelf-to-basin depositional systems tract. The andrew consists of upper and lower depositional units bounded by downlap terminations and high-gamma marker beds. The lower Andrew displays three distinct sand-rich lobes, delineated by isopach, sand percent, log motif, and seismic facies maps Proximal, mounded, sand-rich units disperse into unchannelized sheet turbidites in the basin. No extensive incised submarine valleys feed this unit, which is characterized by coarsening and thickening-upward log responses and hummocky to discontinuous reflectors. The upper Andrew downlaps the lower unit and a single, linear sediments source was centered in the Witch ground graben. The dispersal pattern and internal character suggest the upper unit is a proximal slope apron, downlapping and filling interlobe bathymetric lows of the underlying unit. Sharp-based, blocky/digitate log signatures, discontinuous chaotic reflectors, and coarse-grained sediment characterize this unit. The lower Andrew represents a structurally focused, sand-rich lobe complex, without associated incised canyons. The Andrew system evolved as the delta platform expanded onto the proximal fan, resulting in a linear sediment source spilling over the slope as a fringing slope apron.

  11. Development of a Fan-Filter Unit Test Standard, LaboratoryValidations, and its Applications across Industries

    SciTech Connect (OSTI)

    Xu, Tengfang

    2006-10-20

    Lawrence Berkeley National Laboratory (LBNL) is now finalizing the Phase 2 Research and Demonstration Project on characterizing 2-foot x 4-foot (61-cm x 122-cm) fan-filter units in the market using the first-ever standard laboratory test method developed at LBNL.[1][2][3] Fan-filter units deliver re-circulated air and provide particle filtration control for clean environments. Much of the energy in cleanrooms (and minienvironments) is consumed by 2-foot x 4-foot (61-cm x 122-cm) or 4-foot x 4-foot (122-cm x 122-cm) fan-filter units that are typically located in the ceiling (25-100% coverage) of cleanroom controlled environments. Thanks to funding support by the California Energy Commission's Industrial Program of the Public Interest Energy Research (PIER) Program, and significant participation from manufacturers and users of fan-filter units from around the world, LBNL has developed and performed a series of standard laboratory tests and reporting on a variety of 2-foot x 4-foot (61-cm x 122-cm) fan-filter units (FFUs). Standard laboratory testing reports have been completed and reported back to anonymous individual participants in this project. To date, such reports on standard testing of FFU performance have provided rigorous and useful data for suppliers and end users to better understand, and more importantly, to quantitatively characterize performance of FFU products under a variety of operating conditions.[1] In the course of the project, the standard laboratory method previously developed at LBNL has been under continuous evaluation and update.[2][3] Based upon the updated standard, it becomes feasible for users and suppliers to characterize and evaluate energy performance of FFUs in a consistent way.

  12. Regulating the ethylene response of a plant by modulation of F-box proteins

    DOE Patents [OSTI]

    Guo, Hongwei; Ecker, Joseph R.

    2011-03-08

    The invention relates to transgenic plants having reduced sensitivity to ethylene as a result of having a recombinant nucleic acid encoding an F-box protein that interacts with a EIN3 involved in an ethylene response of plants, and a method of producing a transgenic plant with reduced ethylene sensitivity by transforming the plant with a nucleic acid sequence encoding an F-box protein. The inventions also relates to methods of altering the ethylene response in a plant by modulating the activity or expression of an F-box protein.

  13. U.S. DOE Set-Top Box Proceeding | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. DOE Set-Top Box Proceeding U.S. DOE Set-Top Box Proceeding AT&T's U-verse® receivers should not be regulated under EPCA. U-verse® receivers are already among the most energy efficient of the major video service providers, and AT&T continues to work to increase their efficiency. DOE_03_07_2012.pdf (824.65 KB) More Documents & Publications Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Demonstration of

  14. Recovery Act Begins Box Remediation Operations at F Canyon | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Begins Box Remediation Operations at F Canyon Recovery Act Begins Box Remediation Operations at F Canyon May 17, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Paivi Nettamo, SRNS (803) 646-6075 paivi.nettamo@srs.gov AIKEN, S.C. - The F Canyon box remediation program, an American Recovery and Reinvestment Act project at Savannah River Site (SRS), has come online to process legacy transuranic (TRU) waste for off-site shipment and permanent

  15. On the Occurrence of Thermal Runaway in Diode in the J-Box | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy On the Occurrence of Thermal Runaway in Diode in the J-Box On the Occurrence of Thermal Runaway in Diode in the J-Box This PowerPoint presentation, focused on the environmental testing of diodes, was originally presented at the International PV Module Quality Assurance Forum on Feb. 26-27, 2013 in Denver, CO. It details the thermal runaway tests of J-boxes and discusses the Tj measurement method for bypass diodes. The presentation wraps up with a discussion of the team's anticipated

  16. EERE Success Story-NREL Partners with Google in Little Box Challenge |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Partners with Google in Little Box Challenge EERE Success Story-NREL Partners with Google in Little Box Challenge March 21, 2016 - 12:40pm Addthis Photo Courtesy | CET+Power Photo Courtesy | CET+Power Last month, Google and the Institute of Electrical and Electronics Engineers (IEEE) announced Belgium's Red Electrical Devils (a team from CE+T Power) as the winner of the Little Box Challenge, a competition to invent smaller, more efficient inverters that connect solar

  17. Cost reduction ideas for LNG terminals

    SciTech Connect (OSTI)

    Habibullah, A.; Weldin, F.

    1999-07-01

    LNG projects are highly capital intensive and this has long been regarded as being inevitable. However, recent developments are forcing the LNG industry to aggressively seek cost reductions. For example, the gas-to-liquids (GTL) process is increasingly seen as a potential rival technology and is often being touted as an economically superior alternative fuel source. Another strong driving force behind needed cost reductions is the low crude oil price which seems to have settled in the $10--13/bb. range. LNG is well positioned as the fuel of choice for environmentally friendly new power projects. As a result of the projected demand for power especially in the Pacific Rim countries several LNG terminal projects are under consideration. Such projects will require a new generation of LNG terminal designs emphasizing low cost, small scale and safe and fully integrated designs from LNG supply to power generation. The integration of the LNG terminal with the combined cycle gas turbine (CCGT) power plant offers substantial cost savings opportunities for both plants. Various cost reduction strategies and their impact on the terminal design are discussed including cost reduction due to integration.

  18. Termination for superconducting power transmission systems

    DOE Patents [OSTI]

    Forsyth, E.B.; Jensen, J.E.

    1975-08-26

    This patent relates to a cold, electrical gradient, terminal section for a superconducting cable for alternating current power transmission. A cold electrical gradient section filled with a gaseous coolant acting as an insulator is provided in series with a separate thermal gradient section. (auth)

  19. Structural Analysis for Subsidence of Stacked B-25 Boxes

    SciTech Connect (OSTI)

    Jones, W.E.

    2003-06-25

    The Savannah River Site (SRS) and other U.S. Department of Energy (DOE) sites use shallow land burial facilities (i.e., trenches) to dispose low-level radioactive waste. However, at SRS and other DOE sites, waste containers with up to 90 percent void space are disposed in the shallow land burial facilities. Corrosion and degradation of these containers can result in significant subsidence over time, which can compromise the integrity of the long-term cover. This in turn can lead to increased water infiltration through the long-term cover into the waste and subsequent increased radionuclide transport into the environment. Understanding and predicting shallow-buried, low-level waste subsidence behavior is necessary for evaluating cost-effective and appropriate stabilization required to maintain cover system long-term stability and viability, and to obtain stakeholder acceptance of the long-term implications of waste disposal practices. Two methods (dynamic compaction and static surcharge) have been used at SRS to accelerate waste and container consolidation and reduce potential subsidence prior to long term cover construction. Dynamic compaction comprises repeatedly dropping a heavy (20 ton) weight from about a 40-ft height to consolidate the waste and containers. Static surcharge is the use of a thick (15 ft to 30 ft) soil cover to consolidate the underlying materials over a longer time period (three to six months in this case). Quasi-static modeling of a stack of four B-25 boxes at various stags of corrosion with an applied static surcharge has been conducted and is presented herein.

  20. The C-Terminal RpoN Domain of sigma54 Forms an unpredictedHelix-Turn-Helix Motif Similar to domains of sigma70

    SciTech Connect (OSTI)

    Doucleff, Michaeleen; Malak, Lawrence T.; Pelton, Jeffrey G.; Wemmer, David E.

    2005-11-01

    The ''{delta}'' subunit of prokaryotic RNA-polymerase allows gene-specific transcription initiation. Two {sigma} families have been identified, {sigma}{sup 70} and {sigma}{sup 54}, which use distinct mechanisms to initiate transcription and share no detectable sequence homology. Although the {sigma}{sup 70}-type factors have been well characterized structurally by x-ray crystallography, no high-resolution structural information is available for the {sigma}{sup 54}-type factors. Here we present the NMR derived structure of the C-terminal domain of {sigma}{sup 54} from Aquifex aeolicus. This domain (Thr323 to Gly389), which contains the highly conserved RpoN box sequence, consists of a poorly structured N-terminal tail followed by a three-helix bundle, which is surprisingly similar to domains of the {sigma}{sup 70}-type proteins. Residues of the RpoN box, which have previously been shown to be critical for DNA binding, form the second helix of an unpredicted helix-turn-helix motif. This structure's homology with other DNA binding proteins, combined with previous biochemical data, suggest how the C-terminal domain of {sigma}{sup 54} binds to DNA.

  1. Proposed Junction-Box Stress Test (Using an Added Weight) for Use During the Module Qualification (Presentation)

    SciTech Connect (OSTI)

    Miller, D. C.; Wohlgemuth, J. H.; Kurtz, S. R.

    2012-02-01

    Engineering robust adhesion of the junction-box (j-box) is a hurdle typically encountered by photovoltaic (PV) module manufacturers during product development. Furthermore, there are historical incidences of adverse effects (e.g., fires) caused when the j-box/adhesive/module system has failed in the field. The addition of a weight to the j-box during the 'damp heat' IEC qualification test is proposed to verify the basic robustness of the j-box adhesion system. The details of the proposed test are described, in addition to the preliminary results conducted using representative materials and components.

  2. Carlsbad Field Orfice P. O. Box 3090 Carlsbad, New Mexico 88221

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Orfice P. O. Box 3090 Carlsbad, New Mexico 88221 APR 2 4 2 012 Mr. John Kieling , Acting Bureau Chief Hazardous Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive...

  3. From Oak Ridge to the Moon (Y-12 Moon Box) | Y-12 National Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    From Oak Ridge to the Moon ... From Oak Ridge to the Moon (Y-12 Moon Box) The mp4 video format is not supported by this browser. Download video Captions: On Time: 5:26 min. Y-12...

  4. Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2012 Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box 550 Richland, WA 99352 Re: FOIA Request Dear Ms. Riehle: Pursuant to the Freedom of Information Act (5...

  5. Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2013 Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box 550 Richland, WA 99352 Re: FOIA RequestTWINS database Dear Ms. Riehle: Pursuant to the Freedom of...

  6. Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 1, 2014 Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box 550 Richland, WA 99352 Re: FOIA Request Dear Ms. Riehle: Pursuant to the Freedom of Information Act...

  7. Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2014 Dorothy Riehle FOIA Office U.S. Department of Energy P. O. Box 550 Richland, WA 99352 Re: FOIA RequestWaste Treatment Plant Dear Ms. Riehle: Pursuant to the Freedom of...

  8. Workers Remove Glove Boxes from Ventilation at Hanford’s Plutonium Finishing Plant

    Broader source: Energy.gov [DOE]

    An employee at Hanford’s Plutonium Finishing Plant uses a portable band saw to cut the last ventilation duct attached to glove boxes inside the facility’s former processing area.

  9. NREL to Test Inverters for the "Little Box Challenge" Presented by

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Google and IEEE - News Releases | NREL to Test Inverters for the "Little Box Challenge" Presented by Google and IEEE September 22, 2014 The Energy Department's National Renewable Energy Laboratory (NREL) will test power inverters submitted to the Little Box Challenge presented by Google and the IEEE Power Electronics Society. The Challenge is an open competition to build smaller power inverters for use in solar power systems. The winner of the $1 million prize will have designed

  10. Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama"

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama" Michigan Saves' New Marketing PSAs Use Boxing to Solve "Energy Drama" An image from the video with a woman and the words Energy Saver superimposed on the screen. Better Buildings Neighborhood Program partner Michigan Saves is using humor to help residents in the Great Lakes State become more energy efficient. The program's Avoid Energy Drama public service announcement (PSA)