Table of Contents Page 1 NERC 2007 Long-Term Reliability Assessment  

E-Print Network (OSTI)

...................................................................................................... 9 1. Long-term Capacity Margins are Still Inadequate ..............................................................................................10 2. Integration of Wind, Solar, and Nuclear Resources Require Special Considerations in Planning

2

Chapter Three - Pipeline Reliability Assessment  

Science Journals Connector (OSTI)

Abstract Another aspect of pipeline integrity management is the assessment of system reliability over the age of the pipeline. In order to assess the aging effects through the pipe’s lifetime, a reliability assessment is carried out for the pipeline or its segment. The assessment of the residual stress effect is carried out by evaluating the reliability of new uncorroded pipelines, which are assumed to be free from any flaw. The influence of residual stress parameters, mean, and coefficient of variation are considered in the reliability assessment.

Ramesh Singh

2014-01-01T23:59:59.000Z

3

Reliability Assessment of Distribution Systems.  

E-Print Network (OSTI)

?? A stable and reliable electric power supply system is an inevitable pre-requisite for the technological and economic growth of any nation. Due to this,… (more)

Dorji, Tempa

2009-01-01T23:59:59.000Z

4

Reliability Assessment of Fault-Tolerant Dc-Dc Converters for Photovoltaic Applications  

E-Print Network (OSTI)

Reliability Assessment of Fault-Tolerant Dc-Dc Converters for Photovoltaic Applications Sairaj V in photovoltaic energy processing applications is presented. The proposed approach acknowledges the influence through several case studies. Index Terms-- Markov reliability modeling, photovoltaic systems, power

Liberzon, Daniel

5

Flexibility and reliability in long-term planning exercises dedicated to the electricity sector  

E-Print Network (OSTI)

Flexibility and reliability in long-term planning exercises dedicated to the electricity sector of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability are assessed through the level of electrical losses they induced and a related cost. These approaches

Paris-Sud XI, Université de

6

Conditional Reliability Modeling of Short-term River Basin Management  

E-Print Network (OSTI)

CONDITIONAL RELIABILITY MODELING OF SHORT-TERM RIVER BASIN MANAGEMENT ASCE Texas Section Spring Meeting 2003 By: A.Andr?s Salazar, Ph.D. Freese and Nichols, Inc. and Ralph A. Wurbs, P.E., Ph.D. Texas A&M University 2 TEXAS WATER AVAILABITY MODEL...-88Year Storage (x 1000 ac-ft) Periods without shortage = 657 out of 672 (97.8%) What is the probability of satisfying demand when reservoir falls below 100,000 ac-ft? 9 CONDITIONAL RELIABILITY Statistical analysis of small sequences. Simulation 1...

Salazar, A.; Wurbs, R. A.

2003-01-01T23:59:59.000Z

7

Assessing the reliability of linear dynamic transformer thermal modelling  

E-Print Network (OSTI)

Assessing the reliability of linear dynamic transformer thermal modelling X. Mao, D.J. Tylavsky and G.A. McCulla Abstract: Improving the utilisation of transformers requires that the hot-spot and top. An alternative method for assessing transformer model reliability is provided. 1 Introduction The maximally

8

Multi-hazard Reliability Assessment of Offshore Wind Turbines  

E-Print Network (OSTI)

A probabilistic framework is developed to assess the structural reliability of offshore wind turbines. Probabilistic models are developed to predict the deformation, shear force and bending moment demands on the support structure of wind turbines...

Mardfekri Rastehkenari, Maryam 1981-

2012-12-04T23:59:59.000Z

9

Reliability assessment of a 1 MV LTD.  

SciTech Connect

A 1 MV linear transformer driver (LTD) is being tested with a large area e-beam diode load at Sandia National Laboratories (SNL). The experiments will be utilized to determine the repeatability of the output pulse and the reliability of the components. The 1 MV accelerator is being used to determine the feasibility of designing a 6 MV LTD for radiography experiments. The peak voltage, risetime, and pulse width as well as the cavity timing jitter are analyzed to determine the repeatability of the output pulse.

Portillo, Salvador; Chavez, Raymond (Ktech Corporation, Albuquerque, NM); Molina, Isidro; Kim, Alexandre A. (High Current Electronics Institute, Tomsk, Russia); Johnson, David L. (Titan Pulsed Sciences Division, San Leandro, CA); Maenchen, John Eric; Leckbee, Joshua J.; Ziska, Derek Raymond (Ktech Corporation, Albuquerque, NM)

2005-07-01T23:59:59.000Z

10

Reliability assessment of autonomous power systems incorporating HVDC interconnection links  

SciTech Connect

The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

1996-01-01T23:59:59.000Z

11

Software system reliability and safety assessment: an extended FMEA approach  

Science Journals Connector (OSTI)

This paper presents a methodology for assessing the reliability and safety of a software based on an extended Failure Modes and Effects Analysis (FMEA) approach. The methodology is described in steps with illustrative examples. The analysis starts from initial phase of the software development and evolves during the subsequent phases of software development providing valuable information to each phases. Finally, the analysis yields a quantitative assessment of reliability and safety of the software system. The paper's main objective is to support Probabilistic Safety Assessment (PSA) in assessing risk. Risk is a function of severity and failure frequency/probability. The severity is characteristic of failure effects. Failures may be analysed as functional or component failure. In this paper, it is proposed to consider severity levels at functional failure level as it is easier to understand failure effects at functional level. Moreover, various logical combinations of different functional failures can also be formed and analysed using the proposed approach.

Sinda Rebello; Neeraj Kumar Goyal

2010-01-01T23:59:59.000Z

12

Assessing the reliability of web-based statistical software  

E-Print Network (OSTI)

1 Assessing the reliability of web-based statistical software A. M. Kitchen, R. Drachenberg, J and Technology were used to evaluate the accuracy and precision of two web-based statistical packages, Web and is double precision in WebStat). For most statistical analysis needs, the level of accuracy found in Web

Symanzik, Jürgen

13

ORISE 04-0115 Human Reliability Program Medical Assessments 2004  

NLE Websites -- All DOE Office Websites (Extended Search)

ORISE 04-0115 ORISE 04-0115 Office of Security U. S. Department of Energy Human Reliability Program MEDICAL ASSESSMENTS Center for Human Reliability Studies Oak Ridge Institute for Science and Education Operated by Oak Ridge Associated Universities For the U. S. Department of Energy Oak Ridge Associated Universities (ORAU) is a university consortium leveraging the scientific strength of major research institutions to advance science and education by partnering with national laboratories, government agencies, and private industry. ORAU manages the Oak Ridge Institute for Science and Education for the U.S. Department of Energy (DOE). Oak Ridge Institute for Science and Education (ORISE) is a DOE facility focusing on scientific initiatives to research health risks from occupational hazards, assess environmental cleanup, respond to radiation medical

14

Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR)  

SciTech Connect

This Reference Guide contains instructions on how to install and use Version 3.5 of the NRC-sponsored Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR). The NUCLARR data management system is contained in compressed files on the floppy diskettes that accompany this Reference Guide. NUCLARR is comprised of hardware component failure data (HCFD) and human error probability (HEP) data, both of which are available via a user-friendly, menu driven retrieval system. The data may be saved to a file in a format compatible with IRRAS 3.0 and commercially available statistical packages, or used to formulate log-plots and reports of data retrieval and aggregation findings.

Gilbert, B.G.; Richards, R.E.; Reece, W.J.; Gertman, D.I.

1992-10-01T23:59:59.000Z

15

An approach for assessing ALWR passive safety system reliability  

SciTech Connect

Many advanced light water reactor designs incorporate passive rather than active safety features for front-line accident response. A method for evaluating the reliability of these passive systems in the context of probabilistic risk assessment has been developed at Sandia National Laboratories. This method addresses both the component (e.g. valve) failure aspect of passive system failure, and uncertainties in system success criteria arising from uncertainties in the system's underlying physical processes. These processes provide the system's driving force; examples are natural circulation and gravity-induced injection. This paper describes the method, and provides some preliminary results of application of the approach to the Westinghouse AP600 design.

Hake, T M

1991-01-01T23:59:59.000Z

16

Assessment of microelectronics packaging for high temperature, high reliability applications  

SciTech Connect

This report details characterization and development activities in electronic packaging for high temperature applications. This project was conducted through a Department of Energy sponsored Cooperative Research and Development Agreement between Sandia National Laboratories and General Motors. Even though the target application of this collaborative effort is an automotive electronic throttle control system which would be located in the engine compartment, results of this work are directly applicable to Sandia`s national security mission. The component count associated with the throttle control dictates the use of high density packaging not offered by conventional surface mount. An enabling packaging technology was selected and thermal models defined which characterized the thermal and mechanical response of the throttle control module. These models were used to optimize thick film multichip module design, characterize the thermal signatures of the electronic components inside the module, and to determine the temperature field and resulting thermal stresses under conditions that may be encountered during the operational life of the throttle control module. Because the need to use unpackaged devices limits the level of testing that can be performed either at the wafer level or as individual dice, an approach to assure a high level of reliability of the unpackaged components was formulated. Component assembly and interconnect technologies were also evaluated and characterized for high temperature applications. Electrical, mechanical and chemical characterizations of enabling die and component attach technologies were performed. Additionally, studies were conducted to assess the performance and reliability of gold and aluminum wire bonding to thick film conductor inks. Kinetic models were developed and validated to estimate wire bond reliability.

Uribe, F.

1997-04-01T23:59:59.000Z

17

A Unified Framework for Reliability Assessment of Wind Energy Conversion Systems  

E-Print Network (OSTI)

1 A Unified Framework for Reliability Assessment of Wind Energy Conversion Systems Sebastian S a framework for assessing wind energy conversion systems (WECS) reliability in the face of external based on wind energy are: the impact of wind speed variability on system reliability [1]; WECS' reaction

Liberzon, Daniel

18

A Framework for Reliability and Performance Assessment of Wind Energy Conversion Systems  

E-Print Network (OSTI)

1 A Framework for Reliability and Performance Assessment of Wind Energy Conversion Systems proposes a framework for reliability and dynamic performance assessment of wind energy conversion systems--Reliability, Dynamic Performance, Wind Power, Wind Energy Conversion System (WECS), Doubly-Fed Induction Generator

Liberzon, Daniel

19

Reliability Assessment of a Power Grid with Customer Operated CHP Systems Using Monte Carlo Simulation.  

E-Print Network (OSTI)

??This thesis presents a method for reliability assessment of a power grid with distributed generation providing support to the system. The distributed generation units considered… (more)

Manohar, Lokesh Prakash

2009-01-01T23:59:59.000Z

20

A statistical approach to assess measurement reliability of functional DOT for brain imaging  

Science Journals Connector (OSTI)

A statistical approach, based on six forms of the intraclass correlation coefficient, is reviewed, interpreted, and used to assess measurement reliability of functional DOT for brain...

LI, LIN; Zeng, Li; Cazzell, Mary A; Liu, Hanli

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

CERTS 2012 Program Review - Reliability Standards Analysis and Assessment - Gil Tam, EPG  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12-13, 2012 12-13, 2012 Washington, DC FY12 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2011 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Support the NERC committees/groups (Resource Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority - Perform analysis, testing, and monitoring of current and proposed

22

A reliability assessment methodology for distribution systems with distributed generation  

E-Print Network (OSTI)

Generation and Micro-Grid Networks. v TABLE OF CONTENTS CHAPTER Page I INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B. Distribution System Reliability... Generation and Micro-Grid Networks. v TABLE OF CONTENTS CHAPTER Page I INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B. Distribution System Reliability...

Duttagupta, Suchismita Sujaya

2006-08-16T23:59:59.000Z

23

RELIABILITY OF WIND POWER FROM DISPERSED SITES: A PRELIMINARY ASSESSMENT  

E-Print Network (OSTI)

ON METHODOLOGY: FROM WIND POWER FREQUENCY TO LOSS-OF-LOADJ.P. , "Some Aspects of Wind Power Statistics, " J. of Appl.S£CTION Reliability of Wind Power From Dispersed Sites: A Pr

Kahn, E.

2011-01-01T23:59:59.000Z

24

Fracture mechanics models developed for piping reliability assessment in light water reactors: piping reliability project  

SciTech Connect

The efforts concentrated on modifications of the stratified Monte Carlo code called PRAISE (Piping Reliability Analysis Including Seismic Events) to make it more widely applicable to probabilistic fracture mechanics analysis of nuclear reactor piping. Pipe failures are considered to occur as the result of crack-like defects introduced during fabrication, that escape detection during inspections. The code modifications allow the following factors in addition to those considered in earlier work to be treated: other materials, failure criteria and subcritical crack growth characteristic; welding residual and vibratory stresses; and longitudinal welds (the original version considered only circumferential welds). The fracture mechanics background for the code modifications is included, and details of the modifications themselves provided. Additionally, an updated version of the PRAISE user's manual is included. The revised code, known as PRAISE-B was then applied to a variety of piping problems, including various size lines subject to stress corrosion cracking and vibratory stresses. Analyses including residual stresses and longitudinal welds were also performed.

Harris, D.O.; Lim, E.Y.; Dedhia, D.D.; Woo, H.H.; Chou, C.K.

1982-06-01T23:59:59.000Z

25

A case study on effectiveness of structural reliability analysis in nuclear reactor safety assessment  

Science Journals Connector (OSTI)

Problems on reliability of structural integrity occupy an important position in various aspects of nuclear reactor safety. In the present paper, an effective method for quantitative evaluation of structural reliability based on ‘stress strength model’ is developed with the objectives of taking a larger number of factors into the evaluation than before and giving useful results within moderate computing time. The method is applied to the reliability analysis of PWR pressure vessels. The results show the relative importance of inspection as well as the parameter uncertainty for assuring the reliability of the structure, although analysis is limited within the scope of linear elastic fracture mechanics (LEFM). This case study also shows that the analysis of structural reliability is effective for safety assessment of nuclear power plants in general and possibly for the improvements of the consistency in the design code.

A. Yamaguchi; S. Kondo; Y. Togo

1983-01-01T23:59:59.000Z

26

Assessing the reliability of dose coefficients for ingestion and inhalation of 226Ra and 90Sr by members of the public  

Science Journals Connector (OSTI)

......Papers Assessing the reliability of dose coefficients...used to assess the reliability of the appropriate...informing judgements on reliability. This paper describes...parameter uncertainty analysis to quantify uncertainties...testing and nuclear reactor accidents. The results......

M. Puncher

2014-01-01T23:59:59.000Z

27

Multi Anode Photomultiplier Tube Reliability Assessment for the JEM-EUSO Space Mission  

E-Print Network (OSTI)

Reliability assessment in concerned with the analysis of devices and systems whose individual components are prone to fail. This reliability analysis documents the process and results of reliability determination of the JEM-EUSO photomultiplier tube component using the methods 217 Plus. Quantum efficiency degradation and radiation hardness assurance. In conclussion, the levels of damage suffered by the PMTs which comprise the focal surface of JEM-EUSO Space Telescope, are acceptable. The results show as well the greatest contribution to the failure is due to radiation SET. The guaranteed performance of this equipment is a 99.45 per cent, an accepted value of reliability thus fulfilling the objectives and technological challenges of JEM-EUSO.

Prieto-Alfonso, H; Casolino, M; Tsuno, K; Ebisuzaki, T; Frías, M D Rodríguez

2015-01-01T23:59:59.000Z

28

Assessing the Reliability and Economics of Wide-Scale Grid-Connected  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessing the Reliability and Economics of Wide-Scale Grid-Connected Assessing the Reliability and Economics of Wide-Scale Grid-Connected Distributed Energy Generation with Application to Electric Power Systems Under Stress Speaker(s): Hisham Zerriffi Date: November 13, 2003 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Kristina LaCommare Electric power systems can be disrupted due to a variety of stress circumstances. These can range from constraints on the physical infrastructure as a result of under-capacity problems to deliberate attacks in times of conflict. Stress conditions can manifest themselves in a variety of ways and determining both the nature of the stress and the best mathematical representation of that stress in the model is complicated. This talk details a quantitative comparison of the reliability of an

29

Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation  

E-Print Network (OSTI)

2007. Integration of Renewable Resources. Transmissionfor integrating renewable resources on the California ISO-assess the level of renewable resources that can be reliably

Eto, Joseph H.

2011-01-01T23:59:59.000Z

30

Can biomass time series be reliably assessed from CPUE time series data Francis Lalo1  

E-Print Network (OSTI)

1 Can biomass time series be reliably assessed from CPUE time series data only? Francis Laloë1 to abundance. This means (i) that catchability is constant and (ii) that all the biomass is catchable. If so, relative variations in CPUE indicate the same relative variations in biomass. Myers and Worm consider

Hawai'i at Manoa, University of

31

Optimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments  

E-Print Network (OSTI)

. To be on the safe side, regulations require that a pipeline be repaired when it is possible that p â?? p 0 , i.e., when p â?? p 0 . Need for Optimal Resource Allocation for Pipeline As­ sessment: Pipeline repairsOptimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments Cesar J

Kreinovich, Vladik

32

Optimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments  

E-Print Network (OSTI)

. To be on the safe side, regulations require that a pipeline be repaired when it is possible that p p0, i.e., when p p0. Need for Optimal Resource Allocation for Pipeline As- sessment: Pipeline repairs are extremelyOptimized Sampling Frequencies for Weld Reliability Assessments of Long Pipeline Segments Cesar J

Kreinovich, Vladik

33

On Assessing the Accuracy of Offshore Wind Turbine Reliability-Based Design Loads from the Environmental Contour Method  

E-Print Network (OSTI)

On Assessing the Accuracy of Offshore Wind Turbine Reliability-Based Design Loads from to derive design loads for an active stall-regulated offshore wind turbine. Two different Danish offshore contour method; wind turbine; offshore; reliability. INTRODUCTION Inverse reliability techniques

Manuel, Lance

34

Achieving A Long Term Business Impact by Improving the Energy Effectiveness and Reliability of Electric Motors  

E-Print Network (OSTI)

capability. The Corporate Motor Technology Team (CMTT) conceived and led a program to optimize the cost effectiveness and reliability of new motors and developed criteria to determine whether to repair or replace motors that fail. The higher energy efficiency...

Whelan, C. D.

35

Imprecise Reliability Assessment and Decision-Making when the Type of the Probability Distribution of the Random Variables is  

E-Print Network (OSTI)

1 Imprecise Reliability Assessment and Decision-Making when the Type of the Probability Distribution of the Random Variables is Unknown Efstratios Nikolaidis Department of Mechanical Industrial@oakland.edu First ISSMO Internet Conference on Reliability-based Structural Optimization Keywords: Imprecise

Nikolaidis, Efstratios

36

Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR). Version 3.5, Quick Reference Guide  

SciTech Connect

This Reference Guide contains instructions on how to install and use Version 3.5 of the NRC-sponsored Nuclear Computerized Library for Assessing Reactor Reliability (NUCLARR). The NUCLARR data management system is contained in compressed files on the floppy diskettes that accompany this Reference Guide. NUCLARR is comprised of hardware component failure data (HCFD) and human error probability (HEP) data, both of which are available via a user-friendly, menu driven retrieval system. The data may be saved to a file in a format compatible with IRRAS 3.0 and commercially available statistical packages, or used to formulate log-plots and reports of data retrieval and aggregation findings.

Gilbert, B.G.; Richards, R.E.; Reece, W.J.; Gertman, D.I.

1992-10-01T23:59:59.000Z

37

Reliability assessment of Passive Containment Cooling System of an Advanced Reactor using APSRA methodology  

Science Journals Connector (OSTI)

Abstract Passive Systems are increasingly playing a prominent role in the advanced nuclear reactor systems and are being utilised in normal operations as well as safety systems of the reactors following an accident. The Passive Containment Cooling System (PCCS) is one of the several passive safety features in an Advanced Reactor (AHWR). In this paper, the APSRA methodology has been employed for reliability evaluation of the PCCS of AHWR. Performance assessment of the PCCS is initially performed during a postulated design basis LOCA using the best-estimate code RELAP5/Mod 3.2. The parameters affecting the system performance are then identified and considered for further analysis. Based on some pre-determined failure criterion, the failure surface for the system is predicted using the best-estimate code taking into account the deviations of the identified parameters from their nominal states as well as the model uncertainties inherent to the best estimate code. Root diagnosis is then carried out to determine the various failure causes, which occurs mainly due to malfunctioning of mechanical components. The failure probabilities of the various components are assessed through a classical PSA treatment using generic data. The reliability of the PCCS is then evaluated from the probability of availability of these components.

Mukesh Kumar; Aranyak Chakravarty; A.K. Nayak; Hari Prasad; V. Gopika

2014-01-01T23:59:59.000Z

38

Valuing time and reliability: assessing the evidence from road pricing demonstrations  

E-Print Network (OSTI)

distribution of motorists’ preferences for travel time and reliability:time and reliability as preferences about this distribution.reliability can be fruitfully modeled as a property of the upper tail of the travel-time distribution

Brownstone, David; Small, K A

2005-01-01T23:59:59.000Z

39

Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report  

SciTech Connect

The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

Vierow, Karen; Aldemir, Tunc

2009-09-10T23:59:59.000Z

40

Short Term Load Forecasting with Fuzzy Logic Systems for power system planning and reliability?A Review  

Science Journals Connector (OSTI)

Load forecasting is very essential to the operation of Electricity companies. It enhances the energy efficient and reliable operation of power system. Forecasting of load demand data forms an important component in planning generation schedules in a power system. The purpose of this paper is to identify issues and better method for load foecasting. In this paper we focus on fuzzy logic system based short term load forecasting. It serves as overview of the state of the art in the intelligent techniques employed for load forecasting in power system planning and reliability. Literature review has been conducted and fuzzy logic method has been summarized to highlight advantages and disadvantages of this technique. The proposed technique for implementing fuzzy logic based forecasting is by Identification of the specific day and by using maximum and minimum temperature for that day and finally listing the maximum temperature and peak load for that day. The results show that Load forecasting where there are considerable changes in temperature parameter is better dealt with Fuzzy Logic system method as compared to other short term forecasting techniques.

R. M. Holmukhe; Mrs. Sunita Dhumale; Mr. P. S. Chaudhari; Mr. P. P. Kulkarni

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment  

SciTech Connect

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commission’s (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

Jeffrey C. JOe; Ronald L. Boring

2014-06-01T23:59:59.000Z

42

Using the negative log-gamma distribution for Bayesian system reliability assessment.  

E-Print Network (OSTI)

??Modeling system reliability over time when binary data are collected both at the system and component level has been the subject of many papers. In… (more)

Zoh, Roger

2012-01-01T23:59:59.000Z

43

North American Electric Reliability Corporation (NERC): Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporation (NERC): Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses adequacy annually via a ten-year forcast and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to

44

Application of fault tree analysis for customer reliability assessment of a distribution power system  

Science Journals Connector (OSTI)

A new method is developed for predicting customer reliability of a distribution power system using the fault tree approach with customer weighted values of component failure frequencies and downtimes. Conventional customer reliability prediction of the electric grid employs the system average (SA) component failure frequency and downtime that are weighted by only the quantity of the components in the system. These SA parameters are then used to calculate the reliability and availability of components in the system, and eventually to find the effect on customer reliability. Although this approach is intuitive, information is lost regarding customer disturbance experiences when customer information is not utilized in the SA parameter calculations, contributing to inaccuracies when predicting customer reliability indices in our study. Hence our new approach directly incorporates customer disturbance information in component failure frequency and downtime calculations by weighting these parameters with information of customer interruptions. This customer weighted (CW) approach significantly improves the prediction of customer reliability indices when applied to our reliability model with fault tree and two-state Markov chain formulations. Our method has been successfully applied to an actual distribution power system that serves over 2.1 million customers. Our results show an improved benchmarking performance on the system average interruption frequency index (SAIFI) by 26% between the SA-based and CW-based reliability calculations.

Fariz Abdul Rahman; Athi Varuttamaseni; Michael Kintner-Meyer; John C. Lee

2013-01-01T23:59:59.000Z

45

Estimation of the reliability of space nuclear power systems by probabilistic risk assessment techniques  

E-Print Network (OSTI)

Thermionic Reactor (SEHPTR). The present analysis focuses on the SNPS failure to produce nominal electrical power. Typical events threatening the reliability of the SNPS will consist of hardware failures, external events, and command errors or software...

Gutner, Sophie Isabelle

2012-06-07T23:59:59.000Z

46

A Situational Assessment of Student Leadership: An Evaluation of Alternate Forms Reliability and Convergent Validity.  

E-Print Network (OSTI)

??The Situational Assessment of Leadership: Student Assessment (SALSA©) was developed in the spring of 2009 to be used as a measure of student leadership. Study… (more)

Slack, Patricia

2010-01-01T23:59:59.000Z

47

Assessment of Different Bioenergy Concepts in Terms of Sustainable Development  

Science Journals Connector (OSTI)

This chapter focuses on the assessment of different concepts’ sustainability regarding the energetic use of biomass in rural areas. The aim is to provide decision support, while taking environmental, economic, so...

Swantje Eigner-Thiel; Meike Schmehl…

2013-01-01T23:59:59.000Z

48

Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation  

SciTech Connect

An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

Eto, Joseph H.; Undrill, John; Mackin, Peter; Daschmans, Ron; Williams, Ben; Haney, Brian; Hunt, Randall; Ellis, Jeff; Illian, Howard; Martinez, Carlos; O'Malley, Mark; Coughlin, Katie; LaCommare, Kristina Hamachi

2010-12-20T23:59:59.000Z

49

A hybrid measure-correlate-predict method for long-term wind condition assessment  

Science Journals Connector (OSTI)

Abstract This paper develops a hybrid measure-correlate-predict (MCP) strategy to assess long-term wind resource variations at a farm site. The hybrid MCP method uses recorded data from multiple reference stations to estimate long-term wind conditions at a target wind plant site with greater accuracy than is possible with data from a single reference station. The weight of each reference station in the hybrid strategy is determined by the (i) distance and (ii) elevation differences between the target farm site and each reference station. In this case, the wind data is divided into sectors according to the wind direction, and the MCP strategy is implemented for each wind direction sector separately. The applicability of the proposed hybrid strategy is investigated using five MCP methods: (i) the linear regression; (ii) the variance ratio; (iii) the Weibull scale; (iv) the artificial neural networks; and (v) the support vector regression. To implement the hybrid MCP methodology, we use hourly averaged wind data recorded at five stations in the state of Minnesota between 07-01-1996 and 06-30-2004. Three sets of performance metrics are used to evaluate the hybrid MCP method. The first set of metrics analyze the statistical performance, including the mean wind speed, wind speed variance, root mean square error, and mean absolute error. The second set of metrics evaluate the distribution of long-term wind speed; to this end, the Weibull distribution and the Multivariate and Multimodal Wind Distribution models are adopted. The third set of metrics analyze the energy production of a wind farm. The best hybrid MCP strategy from 256 different combinations of MCP algorithms and reference stations is investigated and selected. The results illustrate that the many-to-one correlation in such a hybrid approach can provide a more reliable prediction of long-term on-site wind variations than that provided by the one-to-one correlations. The accuracy of the hybrid MCP method is found to be highly sensitive to the combination of individual MCP algorithms and reference stations used. It is also observed that the best combination of MCP algorithms is influenced by the length of the concurrent short-term correlation period.

Jie Zhang; Souma Chowdhury; Achille Messac; Bri-Mathias Hodge

2014-01-01T23:59:59.000Z

50

Corrosion of Spent Nuclear Fuel: The Long-Term Assessment  

SciTech Connect

Spent nuclear fuel, essentially U{sub 2}, accounts for over 95% of the total radioactivity of all of the radioactive wastes in the United States that require disposal, disposition or remediation. The UO{sub 2} in SNF is not stable under oxiding conditions and may also be altered under reducing conditions. The alteration of SNF results in the formation of new uranium phases that can cause the release or retardation of actinide and fission product radionuclides. Over the long term, and depending on the extent to which the secondary uranium phases incorporate fission products and actinides, these alteration phases become the near-field source term.

Rodney C. Ewing

2004-10-07T23:59:59.000Z

51

The Missing Link: Assessing the Reliability of Internet Citations in History Journals  

E-Print Network (OSTI)

(31 October 2003): 787–88; Renee Crichlow and Nicole Winbush, “Accessibility and Accuracy of Web Page References in 5 Major Medical Journals,” JAMA 292 (2004): 2723– 24; Eric J. Hester et al., “Internet Citations in Oncology Journals: A Vanishing...- search note marks the first published attempt to answer that question in any field of the humanities or social sciences.2 We examined the reliability of worldwide web citations in two leading history journals (Journal of American History and American...

Russell, Edmund P.; Kane, Jennifer

2008-04-01T23:59:59.000Z

52

Natural Circulation in Water Cooled Nuclear Power Plants Phenomena, models, and methodology for system reliability assessments  

SciTech Connect

In recent years it has been recognized that the application of passive safety systems (i.e., those whose operation takes advantage of natural forces such as convection and gravity), can contribute to simplification and potentially to improved economics of new nuclear power plant designs. In 1991 the IAEA Conference on ''The Safety of Nuclear Power: Strategy for the Future'' noted that for new plants the use of passive safety features is a desirable method of achieving simplification and increasing the reliability of the performance of essential safety functions, and should be used wherever appropriate''.

Jose Reyes

2005-02-14T23:59:59.000Z

53

Uncertainties in NDE Reliability and Assessing the Impact on RI-ISI  

SciTech Connect

A major thrust in the past 20 years has been to upgrade nondestructive examinations (NDE) for use in inservice inspection (ISI) programs to more effectively manage degradation at operating nuclear power plants. Risk-informed ISI (RI-ISI) is one of the outcomes of this work, and this approach relies heavily on the reliability of NDE, when properly applied, to detect sources of expected degradation. There have been a number of improvements in the reliability of NDE, specifically in ultrasonic testing (UT), through training of examiners, and improved equipment and procedure development. However, the most significant improvements in UT were derived by moving from prescriptive requirements to performance based requirements. Even with these substantial improvements, NDE contains significant uncertainties and RI-ISI programs need to address and accommodate this factor. As part of the work that PNNL is conducting for the U. S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, we are examining the impact of these uncertainties on the effectiveness of RI-ISI programs.

Doctor, Steven R.; Anderson, Michael T.

2010-08-01T23:59:59.000Z

54

Models for source term, flow, transport and dose assessment in NRC`s Iterative Performance Assessment, Phase 2  

SciTech Connect

The core consequence modules for the recently completed Phase 2 Iterative Performance Assessment (IPA) of the Yucca Mountain repository for high-level nuclear waste depend on models for releases from the engineered barrier system (source term), flow of liquid and gas, transport of radionuclides in the geosphere and assessment of dose to target populations. The source term model includes temperature and moisture phenomena in the near-field environment, general, pitting and crevice corrosion, contact of the waste form by water, dissolution and oxidation of the waste form, and transport of dissolved and gaseous radionuclides from the waste package by advection and diffusion. The liquid flow and transport models describe water flow through fractures and matrix in both the unsaturated and saturated zones. Models for flow of gas and transport of {sup 14}CO{sub 2} released from the engineered barrier system to the atmosphere take into account repository heat and the geothermal gradient. The dose assessment model calculates doses to a regional population and a farm family for an assumed reference biosphere in the vicinity of the repository. The Phase 2 IPA led to a number of suggestions for model improvement: (1) improve the ability of the models to include spatial and temporal variability in the parameters; (2) improve the coupling among processes, especially the effects of changing environments in the waste packages; (3) develop more mechanistic models, but abstracted for use in total system performance assessment; and (4) use more site specific parameters, especially for the dose assessments.

McCartin, T.; Codell, R.; Neel, R.; Ford, W.; Wescott, R.; Bradbury, J. [Nuclear Regulatory Commission, Washington, DC (United States); Sagar, B.; Walton, J. [Center for Nuclear Waste Regulatory Analyses, San Antonio, TX (United States)

1994-12-31T23:59:59.000Z

55

Reliability and Functional Availability of HVAC Systems  

E-Print Network (OSTI)

This paper presents a model to calculate the reliability and availability of heating, ventilation and air conditioning systems. The reliability is expressed in the terms of reliability, maintainability and decision capability. These terms are a...

Myrefelt, S.

2004-01-01T23:59:59.000Z

56

Physical Stability of Long-Term Surface Barriers-Assessment of Potentially Disruptive Natural Events  

NLE Websites -- All DOE Office Websites (Extended Search)

] ] a -" m HI BHI-00145 Rev. 00 Physical Stability of Long-Term Surface Barriers - Assessment of Potentially Disruptive Natural Events Authors N. R. Wing IT Hanford, Inc. F. M. Corpuz Bechtel Hanford, Inc. K. L. Petersen Pacific Northwest Laboratoy A. M. Tallman Westinghouse Hanford Company Date Published May 1995 HANFORD Prepared for the U.S. Department of Energy Office of Environmental Restoration and Waste Management Bechtel Hanford, Inc. Flichland, Washington Approved for Public Release . b q q BHI-00145 ma) Ou: NIA TSD: NIA ERA: NIA APPROVAL PAGE Title of Dccumw PHYSICAL STABILITY OF LONG-TERM SURFACE BARRIERS - ASSESSMENT OF POTE.INTI.ALLYDISRUPTIVE NATURAL Author(s): N. R. Wq, lT ~Otd, Inc. K. L. PetmerL hCi.fiC Northwest Labmtory F. M. Corpuz, Bechkl Hanford, Inc. A. M. Tai.lmaq W-owe HEUlfOd Corqnny Approvai: J. G. Zoghbi, Acting Manager, Technology Demonstration

57

Assessing the consistency between short-term global temperature trends in observations and climate model projections  

E-Print Network (OSTI)

Assessing the consistency between short-term global temperature trends in observations and climate model projections is a challenging problem. While climate models capture many processes governing short-term climate fluctuations, they are not expected to simulate the specific timing of these somewhat random phenomena - the occurrence of which may impact the realized trend. Therefore, to assess model performance, we develop distributions of projected temperature trends from a collection of climate models running the IPCC A1B emissions scenario. We evaluate where observed trends of length 5 to 15 years fall within the distribution of model trends of the same length. We find that current trends lie near the lower limits of the model distributions, with cumulative probability-of-occurrence values typically between 5 percent and 20 percent, and probabilities below 5 percent not uncommon. Our results indicate cause for concern regarding the consistency between climate model projections and observed climate behavior...

Michaels, Patrick J; Christy, John R; Herman, Chad S; Liljegren, Lucia M; Annan, James D

2013-01-01T23:59:59.000Z

58

Assessment of Long-Term Research Needs for Shale-Oil Recovery (FERWG-III)  

SciTech Connect

The Fossil Energy Research Working Group (FERWG), at the request of E. Frieman (Director, Office of Energy Research) and G. Fumich, Jr. (Assistant Secretary for Fossil Fuels), has reviewed and evaluated the U.S. programs on shale-oil recovery. These studies were performed in order to provide an independent assessment of critical research areas that affect the long-term prospects for shale-oil availability. This report summarizes the findings and research recommendations of FERWG.

Penner, S.S.

1981-03-01T23:59:59.000Z

59

Assessment of Long-Term Research Needs for Coal-Liquefaction Technologies  

SciTech Connect

The Fossil Energy Research Working Group (FERWG), at the request of J.M. Deutch (Under Secretary of DOE), E. Frieman (Director, Office of Energy Research) and G. Fumich, Jr. (Assistant Secretary for Fossil Fuels), has studied and reviewed currently funded coal-liquefaction technologies. These studies were performed in order to provide an independent assessment of critical research areas that affect the long-term development of coal-liquefaction technologies. This report summarizes the findings and research recommendations of FERWG.

Penner, S.S.

1980-03-01T23:59:59.000Z

60

The Multimedia Environmental Pollutant Assessment System (MEPAS){reg_sign}: Source-term release formulations  

SciTech Connect

This report is one of a series of reports that document the mathematical models in the Multimedia Environmental Pollutant Assessment System (MEPAS). Developed by Pacific Northwest National Laboratory for the US Department of Energy, MEPAS is an integrated impact assessment software implementation of physics-based fate and transport models in air, soil, and water media. Outputs are estimates of exposures and health risk assessments for radioactive and hazardous pollutants. Each of the MEPAS formulation documents covers a major MEPAS component such as source-term, atmospheric, vadose zone/groundwater, surface water, and health exposure/health impact assessment. Other MEPAS documentation reports cover the sensitivity/uncertainty formulations and the database parameter constituent property estimation methods. The pollutant source-term release component is documented in this report. MEPAS simulates the release of contaminants from a source, transport through the air, groundwater, surface water, or overland pathways, and transfer through food chains and exposure pathways to the exposed individual or population. For human health impacts, risks are computed for carcinogens and hazard quotients for noncarcinogens. MEPAS is implemented on a desktop computer with a user-friendly interface that allows the user to define the problem, input the required data, and execute the appropriate models for both deterministic and probabilistic analyses.

Streile, G.P.; Shields, K.D.; Stroh, J.L.; Bagaasen, L.M.; Whelan, G.; McDonald, J.P.; Droppo, J.G.; Buck, J.W.

1996-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Dynamic reliability and risk assessment of the accident localization system of the Ignalina NPP RBMK-1500 reactor  

Science Journals Connector (OSTI)

The paper presents reliability and risk analysis of the RBMK-1500 reactor accident localization system (ALS) (confinement), which prevents radioactive releases to the environment. Reliability of the system was estimated and compared by two methods: the conventional fault tree method and an innovative dynamic reliability model, based on stochastic differential equations. Frequency of radioactive release through ALS was also estimated. The results of the study indicate that conventional fault tree modeling techniques in this case apply high degree of conservatism in the system reliability estimates. One of the purposes of the ALS reliability study was to demonstrate advantages of the dynamic reliability analysis against the conventional fault/event tree methods. The Markovian framework to deal with dynamic aspects of system behavior is presented. Although not analyzed in detail, the framework is also capable of accounting for non-constant component failure rates. Computational methods are proposed to solve stochastic differential equations, including analytical solution, which is possible only for relatively small and simple systems. Other numerical methods, like Monte Carlo and numerical schemes of differential equations are analyzed and compared. The study is finalized with concluding remarks regarding both the studied system reliability and computational methods used.

V. Kopustinskas; J. Augutis; S. Rimkevi?ius

2005-01-01T23:59:59.000Z

62

A fuzzy-based reliability approach to evaluate basic events of fault tree analysis for nuclear power plant probabilistic safety assessment  

Science Journals Connector (OSTI)

Abstract Fault tree analysis has been widely utilized as a tool for nuclear power plant probabilistic safety assessment. This analysis can be completed only if all basic events of the system fault tree have their quantitative failure rates or failure probabilities. However, it is difficult to obtain those failure data due to insufficient data, environment changing or new components. This study proposes a fuzzy-based reliability approach to evaluate basic events of system fault trees whose failure precise probability distributions of their lifetime to failures are not available. It applies the concept of failure possibilities to qualitatively evaluate basic events and the concept of fuzzy sets to quantitatively represent the corresponding failure possibilities. To demonstrate the feasibility and the effectiveness of the proposed approach, the actual basic event failure probabilities collected from the operational experiences of the David–Besse design of the Babcock and Wilcox reactor protection system fault tree are used to benchmark the failure probabilities generated by the proposed approach. The results confirm that the proposed fuzzy-based reliability approach arises as a suitable alternative for the conventional probabilistic reliability approach when basic events do not have the corresponding quantitative historical failure data for determining their reliability characteristics. Hence, it overcomes the limitation of the conventional fault tree analysis for nuclear power plant probabilistic safety assessment.

Julwan Hendry Purba

2014-01-01T23:59:59.000Z

63

Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions  

E-Print Network (OSTI)

Use Guide for Power Distribution Reliability Indices. ISBN#Engineers (IEEE) Distribution Reliability Working Group,for Electric Power Distribution Reliability Indices, which

LaCommare, Kristina H.

2008-01-01T23:59:59.000Z

64

IEEE TRANSACTIONS ON SMART GRID, VOL. 5, NO. 4, JULY 2014 1677 Reliability Assessment of Smart Grids Considering  

E-Print Network (OSTI)

connectivity in the cyber network and minimize the load curtail- ment in the power network. A high and protection., power system reliability. NOMENCLATURE Number of data sources. Number of cyber elements in the system. Number of loads in the power network. Number of transmission lines in the power network. Number

Fu, Yong

65

Long-Term Assessment of Critical Radionuclides and Associated Environmental Media at the Savannah River Site  

SciTech Connect

During the operational history of the Savannah River Site (SRS), many different radionuclides have been released from site facilities. However, only a relatively small number of the released radionuclides have been significant contributors to doses and risks to the public. At SRS dose and risk assessments indicate tritium oxide in air and surface water, and Cs-137 in fish and deer have been, and continue to be, the critical radionuclides and pathways. In this assessment, indepth statistical analyses of the long-term trends of tritium oxide in atmospheric and surface water releases and Cs-137 concentrations in fish and deer are provided. Correlations also are provided with 1) operational changes and improvements, 2) geopolitical events (Cold War cessation), and 3) recent environmental remediation projects and decommissioning of excess facilities. For example, environmental remediation of the F- and H-Area Seepage Basins and the Solid Waste Disposal Facility have resulted in a measurable impact on the tritium oxide flux to the onsite Fourmile Branch stream. Airborne releases of tritium oxide have been greatly affected by operational improvements and the end of the Cold War in 1991. However, the effects of SRS environmental remediation activities and ongoing tritium operations on tritium concentrations in the environment are measurable and documented in this assessment. Controlled hunts of deer and feral hogs are conducted at SRS for approximately six weeks each year. Before any harvested animal is released to a hunter, SRS personnel perform a field analysis for Cs-137 concentrations to ensure the hunter's dose does not exceed the SRS administrative game limit of 0.22 millisievert (22 mrem). However, most of the Cs-137 found in SRS onsite deer is not from site operations but is from nuclear weapons testing fallout from the 1950's and early 1960's. This legacy source term is trended in the SRS deer, and an assessment of the ''effective'' half-life of Cs-137 in deer (including the physical decay half-life and the environmental dispersion half-life) is provided. The ''creek mouth'' fisherman is the next most critical pathway at SRS. On an annual basis, three species of fish (panfish, catfish, and bass) are sampled from the mouths of the five SRS streams. Three composites of up to five fish of each species are analyzed from each sampling location. Long-term trending of the Cs-137 concentrations in fish and the subsequent doses from consumption of SRS fish is provided.

Jannik, G. T.; Baker, R. A.; Lee, P. L.; Eddy, T. P.; Blount, G. C.; Whitney, G. R.

2012-11-06T23:59:59.000Z

66

China's Building Energy Use: A Long-Term Perspective based on a Detailed Assessment  

SciTech Connect

We present here a detailed, service-based model of China's building energy use, nested in the GCAM (Global Change Assessment Model) integrated assessment framework. Using the model, we explore long-term pathways of China's building energy use and identify opportunities of reducing greenhouse gas emissions. The inclusion of a structural model of building energy demands within an integrated assessment framework represents a major methodological advance. It allows for a structural understanding of the drivers of building energy consumption while simultaneously considering the other human and natural system interactions that influence changes in the global energy system and climate. We also explore a range of different scenarios to gain insights into how China's building sector might evolve and what the implications might be for improved building energy technology and carbon policies. The analysis suggests that China's building energy growth will not wane anytime soon, although technology improvement will put downward pressure on this growth. Also, regardless of the scenarios represented, the growth will involve the continued, rapid electrification of the buildings sector throughout the century, and this transition will be accelerated by the implementation of carbon policy.

Eom, Jiyong; Clarke, Leon E.; Kim, Son H.; Kyle, G. Page; Patel, Pralit L.

2012-01-13T23:59:59.000Z

67

E-Print Network 3.0 - artery stenosis assessment Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

in long-term renal artery stenosis. However, our primary aim was to gradually assess the effect... are a fast and reliable technique to ... Source: Just, Armin - Physiologisches...

68

Issues in Assessing Short-Term Water Supply Capabilities of Reservoir Systems  

E-Print Network (OSTI)

................................................................................. 59 5.1 Effect of First 60 Years versus Last 60 Years Period-of-Analysis on Reliabilities ............................................................................................ 64 5.2 Annual Volume Reliabilities for the Equal Weight... CHAPTER I INTRODUCTION ................................................................................ 1 1.1. Motivation for the Research .................................................... 1 1.2. Research Objectives...

Schnier, Spencer Thomas

2012-07-16T23:59:59.000Z

69

Hawaii electric system reliability.  

SciTech Connect

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

70

A Multi-State Model for the Reliability Assessment of a Distributed Generation System via Universal Generating Function  

E-Print Network (OSTI)

renewable technology (e.g. wind or solar, etc.) whose behavior is described by a binary state, working assessment, multi-state modeling, universal generating function #12;2 Notations Solar irradiance Total number of discretized solar irradiance states Discretized solar irradiance at state i Random variable representing

Boyer, Edmond

71

Electricity Reliability  

E-Print Network (OSTI)

Electricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization in the future because they have virtually no resistance to electric current, offering the possibility of new electric power equipment with more energy efficiency and higher capacity than today's systems

72

Lessons Learned from Characterization, Performance Assessment, and EPA Regulatory Review of the 1996 Actinide Source Term for the Waste Isolation Pilot Plant  

SciTech Connect

The Waste Isolation Pilot Plant (WIPP) is a US Department of Energy (DOE) facility for the permanent disposal of transuranic waste from defense activities. In 1996, the DOE submitted the Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant (CCA) to the US Environmental Protection Agency (EPA). The CCA included a probabilistic performance assessment (PA) conducted by Sandia National Laboratories to establish compliance with the quantitative release limits defined in 40 CFR 191.13. An experimental program to collect data relevant to the actinide source term began around 1989, which eventually supported the 1996 CCA PA actinide source term model. The actinide source term provided an estimate of mobile dissolved and colloidal Pu, Am, U, Th, and Np concentrations in their stable oxidation states, and accounted for effects of uncertainty in the chemistry of brines in waste disposal areas. The experimental program and the actinide source term included in the CCA PA underwent EPA review lasting more than 1 year. Experiments were initially conducted to develop data relevant to the wide range of potential future conditions in waste disposal areas. Interim, preliminary performance assessments and actinide source term models provided insight allowing refinement of experiments and models. Expert peer review provided additional feedback and confidence in the evolving experimental program. By 1995, the chemical database and PA predictions of WIPP performance were considered reliable enough to support the decision to add an MgO backfill to waste rooms to control chemical conditions and reduce uncertainty in actinide concentrations, especially for Pu and Am. Important lessons learned through the characterization, PA modeling, and regulatory review of the actinide source term are (1) experimental characterization and PA should evolve together, with neither activity completely dominating the other, (2) the understanding of physical processes required to develop conceptual models is greater than can be represented in PA models, (3) experimentalists should be directly involved in model and parameter abstraction and simplification for PA, and (4) external expert review should be incorporated early in a project to increase confidence long before regulatory reviews begin.

Larson, K.W.; Moore, R.C.; Nowak, E.J.; Papenguth, H.W.; Jow, H.

1999-03-22T23:59:59.000Z

73

What Can Meta-Analyses Tell Us About the Reliability of Life Cycle Assessment for Decision Support?  

SciTech Connect

The body of life cycle assessment (LCA) literature is vast and has grown over the last decade at a dauntingly rapid rate. Many LCAs have been published on the same or very similar technologies or products, in some cases leading to hundreds of publications. One result is the impression among decision makers that LCAs are inconclusive, owing to perceived and real variability in published estimates of life cycle impacts. Despite the extensive available literature and policy need formore conclusive assessments, only modest attempts have been made to synthesize previous research. A significant challenge to doing so are differences in characteristics of the considered technologies and inconsistencies in methodological choices (e.g., system boundaries, coproduct allocation, and impact assessment methods) among the studies that hamper easy comparisons and related decision support. An emerging trend is meta-analysis of a set of results from LCAs, which has the potential to clarify the impacts of a particular technology, process, product, or material and produce more robust and policy-relevant results. Meta-analysis in this context is defined here as an analysis of a set of published LCA results to estimate a single or multiple impacts for a single technology or a technology category, either in a statistical sense (e.g., following the practice in the biomedical sciences) or by quantitative adjustment of the underlying studies to make them more methodologically consistent. One example of the latter approach was published in Science by Farrell and colleagues (2006) clarifying the net energy and greenhouse gas (GHG) emissions of ethanol, in which adjustments included the addition of coproduct credit, the addition and subtraction of processes within the system boundary, and a reconciliation of differences in the definition of net energy metrics. Such adjustments therefore provide an even playing field on which all studies can be considered and at the same time specify the conditions of the playing field itself. Understanding the conditions under which a meta-analysis was conducted is important for proper interpretation of both the magnitude and variability in results. This special supplemental issue of the Journal of Industrial Ecology includes 12 high-quality metaanalyses and critical reviews of LCAs that advance understanding of the life cycle environmental impacts of different technologies, processes, products, and materials. Also published are three contributions on methodology and related discussions of the role of meta-analysis in LCA. The goal of this special supplemental issue is to contribute to the state of the science in LCA beyond the core practice of producing independent studies on specific products or technologies by highlighting the ability of meta-analysis of LCAs to advance understanding in areas of extensive existing literature. The inspiration for the issue came from a series of meta-analyses of life cycle GHG emissions from electricity generation technologies based on research from the LCA Harmonization Project of the National Renewable Energy Laboratory (NREL), a laboratory of the U.S. Department of Energy, which also provided financial support for this special supplemental issue. (See the editorial from this special supplemental issue [Lifset 2012], which introduces this supplemental issue and discusses the origins, funding, peer review, and other aspects.) The first article on reporting considerations for meta-analyses/critical reviews for LCA is from Heath and Mann (2012), who describe the methods used and experience gained in NREL's LCA Harmonization Project, which produced six of the studies in this special supplemental issue. Their harmonization approach adapts key features of systematic review to identify and screen published LCAs followed by a meta-analytical procedure to adjust published estimates to ones based on a consistent set of methods and assumptions to allow interstudy comparisons and conclusions to be made. In a second study on methods, Zumsteg and colleagues (2012) propose a checklist for a sta

Brandao, M.; Heath, G.; Cooper, J.

2012-04-01T23:59:59.000Z

74

Nuclear weapon reliability evaluation methodology  

SciTech Connect

This document provides an overview of those activities that are normally performed by Sandia National Laboratories to provide nuclear weapon reliability evaluations for the Department of Energy. These reliability evaluations are first provided as a prediction of the attainable stockpile reliability of a proposed weapon design. Stockpile reliability assessments are provided for each weapon type as the weapon is fielded and are continuously updated throughout the weapon stockpile life. The reliability predictions and assessments depend heavily on data from both laboratory simulation and actual flight tests. An important part of the methodology are the opportunities for review that occur throughout the entire process that assure a consistent approach and appropriate use of the data for reliability evaluation purposes.

Wright, D.L. [Sandia National Labs., Albuquerque, NM (United States)

1993-06-01T23:59:59.000Z

75

Morsleben Nuclear Waste Repository Probabilistic Safety Assessment of the Long-Term Safety  

Science Journals Connector (OSTI)

The probabilistic safety assessment for a radioactive waste repository in a former salt mine is presented. Even with a simplified model, the number of parameters is high. Uncertainties in the parameter values ...

Georg Resele; Matthias Niemeyer…

2004-01-01T23:59:59.000Z

76

Reliability evaluation of smart distribution grids.  

E-Print Network (OSTI)

??The term "Smart Grid" generally refers to a power grid equipped with the advanced technologies dedicated for purposes such as reliability improvement, ease of control… (more)

Kazemi, Shahram

2011-01-01T23:59:59.000Z

77

Robust Design of Reliability Test Plans Using Degradation Measures.  

SciTech Connect

With short production development times, there is an increased need to demonstrate product reliability relatively quickly with minimal testing. In such cases there may be few if any observed failures. Thus, it may be difficult to assess reliability using the traditional reliability test plans that measure only time (or cycles) to failure. For many components, degradation measures will contain important information about performance and reliability. These measures can be used to design a minimal test plan, in terms of number of units placed on test and duration of the test, necessary to demonstrate a reliability goal. Generally, the assumption is made that the error associated with a degradation measure follows a known distribution, usually normal, although in practice cases may arise where that assumption is not valid. In this paper, we examine such degradation measures, both simulated and real, and present non-parametric methods to demonstrate reliability and to develop reliability test plans for the future production of components with this form of degradation.

Lane, Jonathan Wesley; Lane, Jonathan Wesley; Crowder, Stephen V.; Crowder, Stephen V.

2014-10-01T23:59:59.000Z

78

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Screenshot of the cover of an NREL report, titled Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 testing. The NREL wind research program's Gearbox Reliability Collaborative publishes reports and presentations of its activities. General Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan 2013 DOE/NREL Gearbox Reliability Collaborative: All Members Meeting Agenda 2012 Gearbox Reliability Collaborative Phase 1 and 2: Testing and Modeling Results 2012 Gearbox Reliability Collaborative Update: A Brief (Presentation) Jan 2012 Gearbox Reliability Collaborative Update (Presentation) April 2012 NREL Collaborates to Improve Wind Turbine Technology (Fact Sheet) 2012 Gearbox Reliability Collaborative - Phase 1 and 2 Overview

79

Long-Term Assessment of Critical Radionuclides and Associated Environmental Media at the Savannah River Site - 13038  

SciTech Connect

During the operational history of the Savannah River Site (SRS), many different radionuclides have been released from site facilities. However, only a relatively small number of the released radionuclides have been significant contributors to doses and risks to the public. At SRS dose and risk assessments indicate tritium oxide in air and surface water, and Cs-137 in fish and deer have been, and continue to be, the critical radionuclides and pathways. In this assessment, statistical analyses of the long-term trends of tritium oxide in atmospheric and surface water releases and Cs-137 concentrations in fish and deer are provided. Correlations also are provided with 1) operational changes and improvements, 2) geopolitical events (Cold War cessation), and 3) recent environmental remediation projects and decommissioning of excess facilities. For example, environmental remediation of the F- and H-Area Seepage Basins and the Solid Waste Disposal Facility have resulted in a measurable impact on the tritium oxide flux to the onsite Fourmile Branch stream. Airborne releases of tritium oxide have been greatly affected by operational improvements and the end of the Cold War in 1991. However, the effects of SRS environmental remediation activities and ongoing tritium operations on tritium concentrations in the environment are measurable and documented in this assessment. Controlled hunts of deer and feral hogs are conducted at SRS for approximately six weeks each year. Before any harvested animal is released to a hunter, SRS personnel perform a field analysis for Cs-137 concentrations to ensure the Hunter's dose does not exceed the SRS administrative game limit of 0.22 milli-sievert (22 mrem). However, most of the Cs-137 found in SRS onsite deer is not from site operations but is from nuclear weapons testing fallout from the 1950's and early 1960's. This legacy source term is trended in the SRS deer, and an assessment of the 'effective' half-life of Cs-137 in deer (including the physical decay half-life and the environmental dispersion half-life) is provided. The 'creek mouth' fisherman is the next most critical pathway at SRS. On an annual basis, three species of fish (panfish, catfish, and bass) are sampled from the mouths of the five SRS streams. Three composites of up to five fish of each species are analyzed from each sampling location. Long-term trending of the Cs-137 concentrations in fish and the subsequent doses from consumption of SRS fish is provided. (authors)

Jannik, G.T.; Baker, R.A.; Lee, P.L. [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Eddy, T.P.; Blount, G.C. [Savannah River Nuclear Solutions, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions, Savannah River Site, Aiken, SC 29808 (United States); Whitney, G.R. [US Department of Energy, Savannah River Operations, Aiken, SC 29808 (United States)] [US Department of Energy, Savannah River Operations, Aiken, SC 29808 (United States)

2013-07-01T23:59:59.000Z

80

Human Reliability Program Workshop  

SciTech Connect

A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

Landers, John; Rogers, Erin; Gerke, Gretchen

2014-05-18T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Small integrating meter for assessing long-term exposure to magnetic fields  

SciTech Connect

A small, lightweight meter has been developed for magnetic-field measurements, particularly those needed for exposure-assessment purposes. This meter, known as the AMEX-3D, continuously measures all three axes of magnetic-flux density and electronically combines the data into a single estimate of cumulative exposure to the root-mean-square (rms) resultant flux density. The AMEX-3D weighs about 120 g, measures 2.7 cm x 5.1 cm x 10.2 cm, and is battery powered. Two panel-mounted jacks are provided for measuring battery voltage and for reading cumulative exposure data from the unit. The instrument has, within 3 dB, a flat response to magnetic flux densities at all frequencies in its 30-1,000 Hz bandwidth. A detailed analysis of error sources in the AMEX-3D leads to an estimate of [plus minus] 20% as the accuracy of the instrument over its dynamic range, which extends from 0.02 to 15 microT. The AMEX-3D was tested in the field by asking electric-utility distribution linemen to wear AMEX-3D and EMDEX meters simultaneously while working. Agreement between the two measures of exposure was excellent.

Kaune, W.T.; Niple, J.C.; Liu, M.J.; Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-01-01T23:59:59.000Z

82

Assessment of children's long-term exposure to magnetic fields (the Enertech study)  

SciTech Connect

The objective of this study was to evaluate whether engineering approaches to estimating residential fields due to ground currents and outdoor line currents provide a valid basis for assessing magnetic field exposure. Investigators selected 35 homes representing a range of external utility wiring and home grounding characteristics. During two visits to the study houses about half a year apart, they measured ground currents, indoor magnetic fields (both 24-hour and spot), outdoor magnetic field profiles, and using a three-axis integrating meter (the AMEX-3D) also measured personal exposure. They also collected data on residential power consumption and utility load on the distribution system during the measurement period. The investigators tested whether engineering-based exposure estimates correlated with those measured on the AMEX-3D. Time-weighted-average (TWA) magnetic field exposure as recorded on the AMEX-3D correlated significantly with both the power consumed within individual residences and the power flowing on the utility distribution system. Spot-measured fields were also associated with these quantities. However, compared with the use of spot-measured fields or the Wertheimer-Leeper wiring code, the model incorporating residential consumption and utility loading did not improve the predictability of personal exposure. In addition, temporal variation in the consumption/loading data was not useful in predicting temporal differences in exposure patterns. Despite the statistically significant correlations of spot-measured fields with exposure during the same or even the other of two visits, personal exposures during the two visits were poorly correlated.

Kaune, W.T.; Zaffanella, L.E.

1992-11-01T23:59:59.000Z

83

Incorporating long-term climate change in performance assessment for the Waste Isolation Pilot Plant  

SciTech Connect

The United States Department of Energy (DOE) is developing the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico for the disposal of transuranic wastes generated by defense programs. Applicable regulations (40 CFR 191) require the DOE to evaluate disposal-system performance for 10,000 yr. Climatic changes may affect performance by altering groundwater flow. Paleoclimatic data from southeastern New Mexico and the surrounding area indicate that the wettest and coolest Quaternary climate at the site can be represented by that at the last glacial maximum, when mean annual precipitation was approximately twice that of the present. The hottest and driest climates have been similar to that of the present. The regularity of global glacial cycles during the late Pleistocene confirms that the climate of the last glacial maximum is suitable for use as a cooler and wetter bound for variability during the next 10,000 yr. Climate variability is incorporated into groundwater-flow modeling for WIPP PA by causing hydraulic head in a portion of the model-domain boundary to rise to the ground surface with hypothetical increases in precipitation during the next 10,000 yr. Variability in modeled disposal-system performance introduced by allowing had values to vary over this range is insignificant compared to variability resulting from other causes, including incomplete understanding of transport processes. Preliminary performance assessments suggest that climate variability will not affect regulatory compliance.

Swift, P.N. [Sandia National Labs., Albuquerque, NM (United States); Baker, B.L. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States); Economy, K. [Ecodynamics Research Associates, Albuquerque, NM (United States); Garner, J.W. [Applied Physics, Inc., Albuquerque, NM (United States); Helton, J.C. [Arizona State Univ., Tempe, AZ (United States); Rudeen, D.K. [New Mexico Engineering Research Institute, Albuquerque, NM (United States)

1994-03-01T23:59:59.000Z

84

Transmission Reliability | Department of Energy  

Energy Savers (EERE)

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

85

2012 Annual Planning Summary for Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Electricity Delivery and Energy Reliability.

86

Definition: Reliability Coordinator Information System | Open Energy  

Open Energy Info (EERE)

Reliability Coordinator Information System Reliability Coordinator Information System Jump to: navigation, search Dictionary.png Reliability Coordinator Information System The system that Reliability Coordinators use to post messages and share operating information in real time.[1] Related Terms Reliability Coordinator References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Information_System&oldid=480407" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

87

Sandia National Laboratories performance assessment methodology for long-term environmental programs : the history of nuclear waste management.  

SciTech Connect

Sandia National Laboratories (SNL) is the world leader in the development of the detailed science underpinning the application of a probabilistic risk assessment methodology, referred to in this report as performance assessment (PA), for (1) understanding and forecasting the long-term behavior of a radioactive waste disposal system, (2) estimating the ability of the disposal system and its various components to isolate the waste, (3) developing regulations, (4) implementing programs to estimate the safety that the system can afford to individuals and to the environment, and (5) demonstrating compliance with the attendant regulatory requirements. This report documents the evolution of the SNL PA methodology from inception in the mid-1970s, summarizing major SNL PA applications including: the Subseabed Disposal Project PAs for high-level radioactive waste; the Waste Isolation Pilot Plant PAs for disposal of defense transuranic waste; the Yucca Mountain Project total system PAs for deep geologic disposal of spent nuclear fuel and high-level radioactive waste; PAs for the Greater Confinement Borehole Disposal boreholes at the Nevada National Security Site; and PA evaluations for disposal of high-level wastes and Department of Energy spent nuclear fuels stored at Idaho National Laboratory. In addition, the report summarizes smaller PA programs for long-term cover systems implemented for the Monticello, Utah, mill-tailings repository; a PA for the SNL Mixed Waste Landfill in support of environmental restoration; PA support for radioactive waste management efforts in Egypt, Iraq, and Taiwan; and, most recently, PAs for analysis of alternative high-level radioactive waste disposal strategies including repositories deep borehole disposal and geologic repositories in shale and granite. Finally, this report summarizes the extension of the PA methodology for radioactive waste disposal toward development of an enhanced PA system for carbon sequestration and storage systems. These efforts have produced a generic PA methodology for the evaluation of waste management systems that has gained wide acceptance within the international community. This report documents how this methodology has been used as an effective management tool to evaluate different disposal designs and sites; inform development of regulatory requirements; identify, prioritize, and guide research aimed at reducing uncertainties for objective estimations of risk; and support safety assessments.

Marietta, Melvin Gary; Anderson, D. Richard; Bonano, Evaristo J.; Meacham, Paul Gregory (Raytheon Ktech, Albuquerque, NM)

2011-11-01T23:59:59.000Z

88

IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 3, SEPTEMBER 2005 421 Reliability Optimization of Distributed Access  

E-Print Network (OSTI)

of the SSA. Index Terms--Branch and bound, distributed access networks, optimization, system reliabilityIEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 3, SEPTEMBER 2005 421 Reliability Optimization of Distributed Access Networks With Constrained Total Cost Fang-Ming Shao, Xuemin (Sherman) Shen, Senior Member

Shen, Xuemin "Sherman"

89

Software Reliability Cases: The Bridge Between Hardware, Software and System Safety and Reliability  

SciTech Connect

High integrity/high consequence systems must be safe and reliable; hence it is only logical that both software safety and software reliability cases should be developed. Risk assessments in safety cases evaluate the severity of the consequences of a hazard and the likelihood of it occurring. The likelihood is directly related to system and software reliability predictions. Software reliability cases, as promoted by SAE JA 1002 and 1003, provide a practical approach to bridge the gap between hardware reliability, software reliability, and system safety and reliability by using a common methodology and information structure. They also facilitate early insight into whether or not a project is on track for meeting stated safety and reliability goals, while facilitating an informed assessment by regulatory and/or contractual authorities.

Herrmann, D.S.; Peercy, D.E.

1999-01-08T23:59:59.000Z

90

Long-term fate of depleted uranium at Aberdeen and Yuma Proving Grounds: Human health and ecological risk assessments  

SciTech Connect

The purpose of this study was to evaluate the immediate and long-term consequences of depleted uranium (DU) in the environment at Aberdeen Proving Ground (APG) and Yuma Proving Ground (YPG) for the Test and Evaluation Command (TECOM) of the US Army. Specifically, we examined the potential for adverse radiological and toxicological effects to humans and ecosystems caused by exposure to DU at both installations. We developed contaminant transport models of aquatic and terrestrial ecosystems at APG and terrestrial ecosystems at YPG to assess potential adverse effects from DU exposure. Sensitivity and uncertainty analyses of the initial models showed the portions of the models that most influenced predicted DU concentrations, and the results of the sensitivity analyses were fundamental tools in designing field sampling campaigns at both installations. Results of uranium (U) isotope analyses of field samples provided data to evaluate the source of U in the environment and the toxicological and radiological doses to different ecosystem components and to humans. Probabilistic doses were estimated from the field data, and DU was identified in several components of the food chain at APG and YPG. Dose estimates from APG data indicated that U or DU uptake was insufficient to cause adverse toxicological or radiological effects. Dose estimates from YPG data indicated that U or DU uptake is insufficient to cause radiological effects in ecosystem components or in humans, but toxicological effects in small mammals (e.g., kangaroo rats and pocket mice) may occur from U or DU ingestion. The results of this study were used to modify environmental radiation monitoring plans at APG and YPG to ensure collection of adequate data for ongoing ecological and human health risk assessments.

Ebinger, M.H.; Beckman, R.J.; Myers, O.B. [Los Alamos National Lab., NM (United States); Kennedy, P.L.; Clements, W.; Bestgen, H.T. [Colorado State Univ., Ft. Collins, CO (United States). Dept. of Fishery and Wildlife Biology

1996-09-01T23:59:59.000Z

91

Long-term assessment of the oil spill at Bahia Las Minas, Panama. Interim report. Volume 1: Executive summary  

SciTech Connect

On April 27, 1986, at least 8 million liters of medium-weight crude oil spilled from a ruptured storage tank into the Bahia Las Minas on the Caribbean Coast of Panama. Coral reefs, seagrass communities, and mangroves were affected. The area of the spill was also the location of the Smithsonian Tropical Research Institute's Galeta Laboratory where resident and visiting scientists have been studying the ecology of the Bahia Las Minas and the adjacent areas for over 15 years. Because this was a unique opportunity to assess the immediate biological effects following a major spill in the Caribbean region and to monitor the subsequent recovery, the U.S. Department of the Interior Minerals Management Service supported a 5-year environmental study. The objectives of the study are to identify any long-term changes in the marine environment that may have resulted from the spill and to understand the ecological processes causing such changes. This is the first report from the study and addresses the effects observed during the first two years of the effort.

Keller, B.D.; Jackson, J.B.C.

1991-10-01T23:59:59.000Z

92

Long-term assessment of the oil spill at Bahia Las Minas, Panama. Interim report. Volume 2: Technical report  

SciTech Connect

On April 27, 1986, at least 8 million liters of medium-weight crude oil spilled from a ruptured storage tank into the Bahia Las Minas on the Caribbean Coast of Panama. Coral reefs, seagrass communities, and mangroves were affected. The area of the spill was also the location of the Smithsonian Tropical Research Institute's Galeta Laboratory where resident and visiting scientists have been studying the ecology of the Bahia Las Minas and the adjacent areas for over 15 years. Because this was a unique opportunity to assess the immediate biological effects following a major spill in the Caribbean region and to monitor the subsequent recovery, the U.S. Department of the Interior Minerals Management Service supported a 5-year environmental study. The objectives of the study are to identify any long-term changes in the marine environment that may have resulted from the spill and to understand the ecological processes causing such changes. This is the first report from the study and addresses the effects observed during the first two years of the effort.

Keller, B.D.; Jackson, J.B.C.

1991-10-01T23:59:59.000Z

93

2013 Reliability & Markets Peer Review | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 13 presentations over 2 days on August 6 - 7, 2013 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure and market simulations that integrate economics and engineering principles. The activity helps to ensure electric reliability, while also improving the efficiency and economics of market operations. Day 1: August 6 Session I Transmission Investment Assessment Under Uncertainty, Ben Hobbs,

94

Reliability-Centered Maintenance  

Energy.gov (U.S. Department of Energy (DOE))

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

95

North American Electric Reliability Corporation (NERC): Reliability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation...

96

Systematic evaluation of the reliability of marine diesel engines  

Science Journals Connector (OSTI)

A systematic model is proposed for evaluating the operational reliability of marine diesel engines. In mathematical terms, the model is ... permits the estimation of the overall reliability of marine diesel engines

G. S. Gamidov; N. K. Sanaev; Z. I. Adeev

2009-05-01T23:59:59.000Z

97

Definition: Reliability Coordinator Area | Open Energy Information  

Open Energy Info (EERE)

Coordinator Area Coordinator Area Jump to: navigation, search Dictionary.png Reliability Coordinator Area The collection of generation, transmission, and loads within the boundaries of the Reliability Coordinator. Its boundary coincides with one or more Balancing Authority Areas.[1] Related Terms transmission lines, Reliability Coordinator, Balancing Authority Area, transmission line, balancing authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inlin LikeLike UnlikeLike You like this.Sign Up to see what your friends like. e Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Area&oldid=502626" Categories: Definitions ISGAN Definitions What links here Related changes Special pages

98

Comments of North American Electric Reliability Corporation (NERC) to DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North American Electric Reliability Corporation (NERC) North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Response to the Department of Energy's ("DOE") Request for Information (RFI) regarding the "Smart Grid RFI: Addressing Policy and Logistical Challenges." The North American Electric Reliability Corporation's ("NERC") Reliability Assessment and Performance Analysis Group ("RAPA") is currently developing a report, entitled "Reliability Consideration from Integration of Smart Grid" that will address many of the issues raised in the DOE RFI. North American Electric Reliability Corporation (NERC)

99

Human Reliability Program Overview  

SciTech Connect

This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

Bodin, Michael

2012-09-25T23:59:59.000Z

100

Power electronics reliability analysis.  

SciTech Connect

This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

Smith, Mark A.; Atcitty, Stanley

2009-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

All Members Meeting All Members Meeting The Gearbox Reliability Collaborative (GRC) All Members Meeting was held on February 4-5, 2013. The meeting covered advancements made across the NREL GRC project and the latest industry updates on gearbox reliability and operations and maintenance practices. The presentations covered gearbox design updates, gearbox testing updates, experimental data analysis, and operations and maintenance research. Presentations Monday, February 4 Time Presenter Organization Presentation 8:30 a.m. Paul Veers NREL Welcome 8:45 a.m. Mike Derby DOE Overview 9:05 a.m. Jon Keller NREL Gearbox Reliability Collaborative Status and Plans 9:20 a.m. Hal Link NREL New Gearbox #2 Test Plan 9:40 a.m. Hal Link NREL NWTC Dynos and Grid Simulator 10:00 a.m. Jon Keller/Brian McNiff NREL/MLI Gearbox Reliability Collaborative, Phase 3: High Speed Shaft Bearing Loads

102

Depleted Uranium Hexafluoride Management Program. The technology assessment report for the long-term management of depleted uranium hexafluoride. Volume 1  

SciTech Connect

With the publication of a Request for Recommendations and Advance Notice of Intent in the November 10, 1994 Federal Register, the Department of Energy initiated a program to assess alternative strategies for the long-term management or use of depleted uranium hexafluoride. This Request was made to help ensure that, by seeking as many recommendations as possible, Department management considers reasonable options in the long-range management strategy. The Depleted Uranium Hexafluoride Management Program consists of three major program elements: Engineering Analysis, Cost Analysis, and an Environmental Impact Statement. This Technology Assessment Report is the first part of the Engineering Analysis Project, and assesses recommendations from interested persons, industry, and Government agencies for potential uses for the depleted uranium hexafluoride stored at the gaseous diffusion plants in Paducah, Kentucky, and Portsmouth, Ohio, and at the Oak Ridge Reservation in Tennessee. Technologies that could facilitate the long-term management of this material are also assessed. The purpose of the Technology Assessment Report is to present the results of the evaluation of these recommendations. Department management will decide which recommendations will receive further study and evaluation. These Appendices contain the Federal Register Notice, comments on evaluation factors, independent technical reviewers resumes, independent technical reviewers manual, and technology information packages.

Zoller, J.N.; Rosen, R.S.; Holliday, M.A. [and others] [and others

1995-06-30T23:59:59.000Z

103

Depleted Uranium Hexafluoride Management Program. The technology assessment report for the long-term management of depleted uranium hexafluoride. Volume 2  

SciTech Connect

With the publication of a Request for Recommendations and Advance Notice of Intent in the November 10, 1994 Federal Register, the Department of Energy initiated a program to assess alternative strategies for the long-term management or use of depleted uranium hexafluoride. This Request was made to help ensure that, by seeking as many recommendations as possible, Department management considers reasonable options in the long-range management strategy. The Depleted Uranium Hexafluoride Management Program consists of three major program elements: Engineering Analysis, Cost Analysis, and an Environmental Impact Statement. This Technology Assessment Report is the first part of the Engineering Analysis Project, and assesses recommendations from interested persons, industry, and Government agencies for potential uses for the depleted uranium hexafluoride stored at the gaseous diffusion plants in Paducah, Kentucky, and Portsmouth, Ohio, and at the Oak Ridge Reservation in Tennessee. Technologies that could facilitate the long-term management of this material are also assessed. The purpose of the Technology Assessment Report is to present the results of the evaluation of these recommendations. Department management will decide which recommendations will receive further study and evaluation.

Zoller, J.N.; Rosen, R.S.; Holliday, M.A. [and others] [and others

1995-06-30T23:59:59.000Z

104

Reliability of lightning resistant overhead distribution lines  

SciTech Connect

An assessment of the 32 year historical reliability of the 13.8 kV electrical distribution system at the Oak Ridge National Laboratory (ORNL) in Tennessee has yielded several conclusions useful In the planning of Industrial power Systems. The system configuration at ORNL has essentially remained unchanged in the last 32 years which allows a meaningful comparison of reliability trends for the plant`s eight overhead distribution lines, two of which were built in the 1960`s with lightning resistant construction techniques. Meticulous records indicating the cause, duration, and location of 135 electric outages in the plant`s distribution system have allowed a reliability assessment to be performed. The assessment clearly shows how differences in voltage construction class, length, age, and maximum elevation above a reference elevation influence the reliability of overhead power distribution lines. Comparisons are also made between the ORNL historical data and predicted failure rates from ANSI and IEEE industry surveys.

Tolbert, L.M.; Cleveland, J.T.; Degenhardt, L.J.

1995-04-01T23:59:59.000Z

105

Accident Sequence Evaluation Program: Human reliability analysis procedure  

SciTech Connect

This document presents a shortened version of the procedure, models, and data for human reliability analysis (HRA) which are presented in the Handbook of Human Reliability Analysis With emphasis on Nuclear Power Plant Applications (NUREG/CR-1278, August 1983). This shortened version was prepared and tried out as part of the Accident Sequence Evaluation Program (ASEP) funded by the US Nuclear Regulatory Commission and managed by Sandia National Laboratories. The intent of this new HRA procedure, called the ''ASEP HRA Procedure,'' is to enable systems analysts, with minimal support from experts in human reliability analysis, to make estimates of human error probabilities and other human performance characteristics which are sufficiently accurate for many probabilistic risk assessments. The ASEP HRA Procedure consists of a Pre-Accident Screening HRA, a Pre-Accident Nominal HRA, a Post-Accident Screening HRA, and a Post-Accident Nominal HRA. The procedure in this document includes changes made after tryout and evaluation of the procedure in four nuclear power plants by four different systems analysts and related personnel, including human reliability specialists. The changes consist of some additional explanatory material (including examples), and more detailed definitions of some of the terms. 42 refs.

Swain, A.D.

1987-02-01T23:59:59.000Z

106

Energy Efficiency and Reliability Tradeoff in Optical Core Networks  

Science Journals Connector (OSTI)

We assess the highest allowable reliability performance degradation of active components caused by applying energy-efficient mechanisms. EDFAs are identified as the most critical...

Wiatr, Pawel; Chen, Jiajia; Monti, Paolo; Wosinska, Lena

107

NREL: Performance and Reliability R&D - PV Module Reliability...  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability R and D Printable Version PV Module Reliability Workshop NREL hosts an annual Photovoltaic Module Reliability Workshop (PVMRW) so that solar technology experts can...

108

Long-Term Assessment of Isotopic Exchange of Carbon Dioxide in a Subalpine Forest (Niwot Ridge AmeriFlux Site)  

SciTech Connect

In 2005 we began a long-term measurement program of CO{sub 2} and its stable isotopes at the Niwot Ridge AmeriFlux site. Measurements are ongoing.

Bowling, David [University of Utah

2014-01-01T23:59:59.000Z

109

Ecological & Environmental Acoustic Remote Sensor (EcoEARS) Application for Long-Term Monitoring and Assessment of Wildlife  

E-Print Network (OSTI)

and Assessment of Wildlife Gonzalo Sanchez; President, Sanchez Industrial Design, Inc., 3510 Beltline Hwy due to water, wind, geologic activity (the Geophony), acoustic signals can provide information about. Signal analysis techniques to identify wildlife and simultaneous collection of environmental parameters

Maher, Robert C.

110

Reliable Ad Hoc Group Communication using Local Neighborhoods  

E-Print Network (OSTI)

1 Reliable Ad Hoc Group Communication using Local Neighborhoods Lawrence Klos, Golden G. Richard Abstract - In this paper an enhanced reliability protocol added to the ODMRP multicast ad hoc protocol by operational phase. Index Terms ­ Mobile Networking, Ad Hoc Wireless, Multicast, Reliable, ODMRP. I

Richard III, Golden G.

111

Reliability of Heterogeneous Distributed Computing Systems in the Presence  

E-Print Network (OSTI)

Reliability of Heterogeneous Distributed Computing Systems in the Presence of Correlated Failures of correlated failures are also investigated. Index Terms--Distributed computing, load balancing, reliability Jorge E. Pezoa, Member, IEEE and Majeed M. Hayat, Fellow, IEEE Abstract--While the reliability

Hayat, Majeed M.

112

Assessing Vehicle Electricity Demand Impacts on California Electricity Supply  

E-Print Network (OSTI)

near term. Local distribution infrastructure and reliabilityand distribution constraints, Reliability constraints,It does not depict reliability and distribution constraints,

McCarthy, Ryan W.

2009-01-01T23:59:59.000Z

113

7 - Assessing and modelling the performance of nuclear waste and associated packages for long-term management  

Science Journals Connector (OSTI)

Abstract: Examples of analytical approaches and methodologies for modelling the behaviour of waste forms and waste package metals in long-term management of spent nuclear fuel (SNF) and high level waste (HLW) are presented. Two cases, long-term geological disposal and interim extended dry storage, are considered. The integrity of the waste package (or canister) that serves as a barrier is dependent upon the performance of construction metals. Corrosion degradation modes of the construction metals are evaluated. The waste behaviour during SNF degradation is also evaluated. In each mode of corrosion or degradation, the associated risk insights are discussed in the system performance of disposal or storage.

T.M. Ahn

2013-01-01T23:59:59.000Z

114

Medical Aspects of Reliability  

SciTech Connect

This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

Atencio, Julian J.

2014-05-05T23:59:59.000Z

115

Impact of automatic switches on power distribution system reliability  

Science Journals Connector (OSTI)

In this paper quantitative impact of automatic switches on the reliability of power distribution systems is studied. Based on the characteristics of the studied system's topology, the reliability model is developed for the implementation of Monte Carlo simulation. Reliability indices on each load have been computed to obtain an overall reliability assessment of the system, and the sensitivity of the reliability indices to the location of automatic switches is also studied. Simulation results are used to illustrate the validity of the approach and are compared with the historical reliability records.

H. Zheng; Y. Cheng; B. Gou; D. Frank; A. Bern; W.E. Muston

2012-01-01T23:59:59.000Z

116

A method for setting reliability performance criteria  

SciTech Connect

Reliability performance criteria are required for monitoring under the Maintenance Rule. This paper presents a probabilistic approach for establishing these performance criteria on a plant-specific basis. Results are presented for a number of case studies, and are summarized in terms of a deterministic formula. This formula was used to develop and document reliability performance criteria for all Maintenance Rule systems/subsystems at the Vermont Yankee Nuclear Power Station.

Burns, K.J.; Turcotte, R.T. [Yankee Atomic Electric Co., Bolton, MA (United States). Nuclear Engineering Dept.

1996-08-01T23:59:59.000Z

117

Development in structural systems reliability theory  

Science Journals Connector (OSTI)

This paper is concerned with two topics on structural systems reliability theory. One covers automatic generation of failure mode equations, identifications of stochastically dominant failure modes, and reliability assessment of redundant structures. Reduced stiffness matrixes and equivalent nodal forces representing the failed elements are introduced for expressing the safety margins of the elements, using a matrix method. Dominant failure modes are systematically selected by a branch-and-bound technique and heuristic operations. The other discusses the various optimum design problems based on reliability concept. Those problems are interpreted through a solution to a multi-objective optimization problem.

Y. Murotsu

1986-01-01T23:59:59.000Z

118

PARTITION: A program for defining the source term/consequence analysis interface in the NUREG--1150 probabilistic risk assessments  

SciTech Connect

The individual plant analyses in the US Nuclear Regulatory Commission's reassessment of the risk from commercial nuclear power plants (NUREG-1150) consist of four parts: systems analysis, accident progression analysis, source term analysis, and consequence analysis. Careful definition of the interfaces between these parts is necessary for both information flow and computational efficiency. This document has been designed for users of the PARTITION computer program developed by the authors at Sandia National Laboratories for defining the interface between the source term analysis (performed with the XXSOR programs) and the consequence analysis (performed with the MACCS program). This report provides a tutorial that details how the interactive partitioning is performed, along with detailed information on the partitioning process. The PARTITION program was written in ANSI standard FORTRAN 77 to make the code as machine-independent (i.e., portable) as possible. 9 refs., 4 figs.

Iman, R.L. (Sandia National Labs., Albuquerque, NM (USA)); Helton, J.C. (Arizona State Univ., Tempe, AZ (USA)); Johnson, J.D. (Science Applications International Corp., Albuquerque, NM (USA))

1990-05-01T23:59:59.000Z

119

Assessing the Role of Iron Sulfides in the Long Term Sequestration of U by Sulfate Reducing Bacteria  

SciTech Connect

This four-year project’s overarching aim was to identify the role of biogenic and synthetic iron-sulfide minerals in the long-term sequestration of reduced U(IV) formed under sulfate-reducing conditions when subjected to re-oxidizing conditions. As stated in this final report, significant progress was achieved through the collaborative research effort conducted at Arizona State University (ASU) and the University of Michigan (UM).

Rittman, Bruce; Zhou, Chen; Vannela, Raveender

2013-12-31T23:59:59.000Z

120

LONG-TERM GLOBAL WATER USE PROJECTIONS USING SIX SOCIOECONOMIC SCENARIOS IN AN INTEGRATED ASSESSMENT MODELING FRAMEWORK  

SciTech Connect

In this paper, we assess future water demands for the agricultural (irrigation and livestock), energy (electricity generation, primary energy production and processing), industrial (manufacturing and mining), and municipal sectors, by incorporating water demands into a technologically-detailed global integrated assessment model of energy, agriculture, and climate change – the Global Change Assessment Model (GCAM). Base-year water demands—both gross withdrawals and net consumptive use—are assigned to specific modeled activities in a way that maximizes consistency between bottom-up estimates of water demand intensities of specific technologies and practices, and top-down regional and sectoral estimates of water use. The energy, industrial, and municipal sectors are represented in fourteen geopolitical regions, with the agricultural sector further disaggregated into as many as eighteen agro-ecological zones (AEZs) within each region. We assess future water demands representing six socioeconomic scenarios, with no constraints imposed by future water supplies. The scenarios observe increases in global water withdrawals from 3,578 km3 year-1 in 2005 to 5,987 – 8,374 km3 year-1 in 2050, and to 4,719 – 12,290 km3 year-1 in 2095. Comparing the projected total regional water withdrawals to the historical supply of renewable freshwater, the Middle East exhibits the highest levels of water scarcity throughout the century, followed by India; water scarcity increases over time in both of these regions. In contrast, water scarcity improves in some regions with large base-year electric sector withdrawals, such as the USA and Canada, due to capital stock turnover and the almost complete phase-out of once-through flow cooling systems. The scenarios indicate that: 1) water is likely a limiting factor in climate change mitigation policies, 2) many regions can be expected to increase reliance on non-renewable groundwater, water reuse, and desalinated water, but they also highlight an important role for development and deployment of water conservation technologies and practices.

Hejazi, Mohamad I.; Edmonds, James A.; Clarke, Leon E.; Kyle, G. Page; Davies, Evan; Chaturvedi, Vaibhav; Wise, Marshall A.; Patel, Pralit L.; Eom, Jiyong; Calvin, Katherine V.; Moss, Richard H.; Kim, Son H.

2014-01-19T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Supplementary documentation for an Environmental Impact Statement regarding the Pantex Plant: long-term radiological risk assessment for postulated accidents  

SciTech Connect

This report documents work performed in support of preparation of an Environmental Impact Statement regarding the Department of Energy's (DOE) Pantex Plant near Amarillo, Texas. The long-term health effects to people farming the areas studied by Wenzel in 1982 are calculated in this report by predicting plutonium transport in the Texas Panhandle, southeastern Iowa, and south central Washington using the BIOTRAN model. Inhalation and ingestion radiation doses are calculated for each hypothetical accident with releases of 120-, 30-, and 0.625-kg plutonium at the Pantex Plant and the Iowa Army Ammunition Plant (IAAP). The greatest radiation dose for the Pantex Plant and IAAP accidents is the inhalation dose, which accounts for greater than 90% of the long-term effect. Only a 0.625-kg plutonium release is addressed for the Hanford site. Deposited PuO/sub 2/ at levels greater than 0.4 ..mu..Ci/m/sup 2/ dose not extend offsite. Therefore, health effects were not calculated for Hanford. The estimated number of health effects (cancer deaths) based on 1990 populations was higher for these accidents at the Pantex Plant than the IAAP; but the cancer mortality risk (chance/100,000) was found to be greater at the IAAP because of the larger population density closer to the IAAP.

Wenzel, W.J.; Gallegos, A.F.

1982-12-01T23:59:59.000Z

122

LAMPF reliability history and program  

Science Journals Connector (OSTI)

Many years of service of the 800?MeV LAMPF H+/H? linac offers the opportunity to evaluate the long?term reliability characteristics of a high?power machine which with up to 800?kW beam power available is as close to an ADTT machine as exists in the world today. Records from the last 15 years of operation were analyzed for trends and areas of deteriorating reliability or disproportionate downtime and used to support engineering judgment on facility refurbishment to regain beam availability. This round of analysis has helped define a further level of detail and automation to be implemented in availability recording. Interesting features which emerge from the history include a clear measurement of the lower availability in the first operating cycle following extended maintenance periods and a consistent picture of the highest availability to be expected in extended operating periods with the facility as used and maintained. The results provide a starting point for informed discussion of reliability goals.

Olin van Dyck

1995-01-01T23:59:59.000Z

123

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

124

Assessing Reliability In Hydrogen Supply Pathways  

E-Print Network (OSTI)

liquefied natural gas (LNG) at a large, central steamthe established, global LNG infrastructure provided moreenergy supply over the vast LNG network. The global supply

McCarthy, Ryan; Ogden, Joan M

2005-01-01T23:59:59.000Z

125

Assessing Reliability in Energy Supply Systems  

E-Print Network (OSTI)

liquefied natural gas (LNG) trading expected to increase insteam reformation production facility using imported LNG.The LNG supplies come primarily from Trinidad and Tobago,

McCarthy, Ryan; Ogden, Joan M.; Sperling, Dan

2008-01-01T23:59:59.000Z

126

Assessing reliability in energy supply systems  

E-Print Network (OSTI)

liquefied natural gas (LNG) trading expected to increase insteam reformation production facility using imported LNG.The LNG supplies come primarily from Trinidad and Tobago,

McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

2007-01-01T23:59:59.000Z

127

Assessing reliability in energy supply systems  

E-Print Network (OSTI)

and 2) on-site electrolysis of water using renewablepoints of end use via electrolysis of water, so no hydrogen

McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

2007-01-01T23:59:59.000Z

128

Assessing Reliability in Energy Supply Systems  

E-Print Network (OSTI)

and 2) on-site electrolysis of water using renewablepoints of end use via electrolysis of water, so no hydrogen

McCarthy, Ryan; Ogden, Joan M.; Sperling, Dan

2008-01-01T23:59:59.000Z

129

Reliability Assessment Incorporating Operational Considerations and Economic  

E-Print Network (OSTI)

Aspects for Large Interconnected Grids Project Team George Gross, Project Leader University of Illinois For information about this project contact: George Gross Professor of Electrical and Computer Engineering

130

Reliability Standards Owner  

Energy.gov (U.S. Department of Energy (DOE))

This position is located in the Internal Operations and Asset Management group of Planning and Asset Management (TP). A successful candidate in this position will serve as the Reliability Standards...

131

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Projects Gearbox deficiencies are the result of many factors. Through gearbox modeling and testing, condition monitoring, and the failure database, the collaborative is expanding the industry's knowledge base, recommending efficient and cost-effective improvements, and facilitating immediate improvements in the gearbox life cycle. Gearbox Modeling and Testing Illustration of representative gearbox including the hub, main bearing, main shaft, gearbox, brake, high speed shaft, generator, and bed plate. A complete gearbox redesign has been completed in a collaborative effort between NREL and industry partners. This process documented and analyzed the design process and produced a new gearbox design that integrates knowledge from previous Gearbox Reliability Collaborative (GRC) activities.

132

Reliability improvement of distribution systems using SSVR  

Science Journals Connector (OSTI)

This paper presents a reliability assessment algorithm for distribution systems using a Static Series Voltage Regulator (SSVR). Furthermore, this algorithm considers the effects of Distributed Generation (DG) units, alternative sources, system reconfiguration, load shedding and load adding on distribution system reliability indices. In this algorithm, load points are classified into 8 types and separated restoration times are considered for each class. Comparative studies are conducted to investigate the impacts of DG and alternative source unavailability on the distribution system reliability. For reliability assessment, the customer-oriented reliability indices such as SAIFI, SAIDI, CAIDI ASUI and also load- and energy-oriented indices such as ENS and AENS are evaluated. The effectiveness of the proposed algorithm is examined on the two standard distribution systems consisting of 33 and 69 nodes. The best location of the SSVR in distribution systems is determined based on different reliability indices, separately. Results show that the proposed algorithm is efficient for large-scale radial distribution systems and can accommodate the effects of fault isolation and load restoration.

Mehdi Hosseini; Heidar Ali Shayanfar; Mahmoud Fotuhi-Firuzabad

2009-01-01T23:59:59.000Z

133

Coupling of Realistic Rate Estimates with Genomics for Assessing Contaminant Attenuation and Long-Term Plume Containment  

SciTech Connect

Acceptance of monitored natural attenuation (MNA) as a preferred treatment technology saves significant site restoration costs for DOE. However, in order to be accepted MNA requires direct evidence of which processes are responsible for the contaminant loss and also the rates of the contaminant loss. Our proposal aims to: 1) provide evidence for one example of MNA, namely the disappearance of the dissolved trichloroethylene (TCE) from the Snake River Plain aquifer (SRPA) at the Idaho National Laboratory’s Test Area North (TAN) site, 2) determine the rates at which aquifer microbes can co-metabolize TCE, and 3) determine whether there are other examples of natural attenuation of chlorinated solvents occurring at DOE sites. To this end, our research has several objectives. First, we have conducted studies to characterize the microbial processes that are likely responsible for the co-metabolic destruction of TCE in the aquifer at TAN (University of Idaho and INL). Second, we are investigating realistic rates of TCE co-metabolism at the low catabolic activities typical of microorganisms existing under aquifer conditions (INL). Using the co-metabolism rate parameters derived in low-growth bioreactors, we will complete the models that predict the time until background levels of TCE are attained in the aquifer at TAN and validate the long-term stewardship of this plume. Coupled with the research on low catabolic activities of co-metabolic microbes we are determining the patterns of functional gene expression by these cells, patterns that may be used to diagnose the co-metabolic activity in the SRPA or other aquifers. Third, we have systematically considered the aquifer contaminants at different locations in plumes at other DOE sites in order to determine whether MNA is a broadly applicable remediation strategy for chlorinated hydrocarbons (North Wind Inc.). Realistic terms for co-metabolism of TCE will provide marked improvements in DOE’s ability to predict and monitor natural attenuation of chlorinated organics, increase the acceptability of this solution, and provide significant economic and health benefits through this noninvasive remediation strategy. This project also aims to derive valuable genomic information about the functional attributes of subsurface microbial communities upon which DOE must depend to resolve some of its most difficult contamination issues.

Colwell, F. S.; Crawford, R. L.; Sorenson, K.

2005-09-01T23:59:59.000Z

134

Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment of the Surveillance Program of the High-Level Waste Storage Tanks at Hanford :.I LALI iE REJ 163 ROOM 1t 4 F77L. -77 .:earmn OfEeg Asitn Sertr fo niomn 4 z. r...

135

Definition: Reliability Coordinator | Open Energy Information  

Open Energy Info (EERE)

Coordinator Coordinator Jump to: navigation, search Dictionary.png Reliability Coordinator The entity that is the highest level of authority who is responsible for the reliable operation of the Bulk Electric System, has the Wide Area view of the Bulk Electric System, and has the operating tools, processes and procedures, including the authority to prevent or mitigate emergency operating situations in both nextday analysis and real-time operations. The Reliability Coordinator has the purview that is broad enough to enable the calculation of Interconnection Reliability Operating Limits, which may be based on the operating parameters of transmission systems beyond any Transmission Operator's vision.[1] Related Terms transmission lines, Bulk Electric System, transmission line

136

Coupling of Realistic Rate Estimates with Genomics for Assessing Contaminant Attenuation and Long-Term Plume Containment  

SciTech Connect

Acceptance of monitored natural attenuation (MNA) as a preferred treatment technology saves significant site restoration costs for DOE. However, in order to be accepted MNA requires direct evidence of which processes are responsible for the contaminant loss and also the rates of the contaminant loss. Our proposal aims to: 1) provide evidence for one example of MNA, namely the disappearance of the dissolved trichloroethylene (TCE) from the Snake River Plain aquifer (SRPA) at the Idaho National Laboratory’s Test Area North (TAN) site, 2) determine the rates at which aquifer microbes can co-metabolize TCE, and 3) determine whether there are other examples of natural attenuation of chlorinated solvents occurring at DOE sites. To this end, our research has several objectives. First, we have conducted studies to characterize the microbial processes that are likely responsible for the co-metabolic destruction of TCE in the aquifer at TAN (University of Idaho and INL). Second, we are investigating realistic rates of TCE co-metabolism at the low catabolic activities typical of microorganisms existing under aquifer conditions (INL). Using the co-metabolism rate parameters derived in low-growth bioreactors, we will complete the models that predict the time until background levels of TCE are attained in the aquifer at TAN and validate the long-term stewardship of this plume. Coupled with the research on low catabolic activities of co-metabolic microbes we are determining the patterns of functional gene expression by these cells, patterns that may be used to diagnose the co-metabolic activity in the SRPA or other aquifers.

Colwell, F.S.; Crawford, R.L.; Sorenson, K.

2005-09-01T23:59:59.000Z

137

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

138

Parametric probability distributions in reliability  

E-Print Network (OSTI)

Parametric probability distributions in reliability F.P.A. Coolen Department of Mathematical parametric probability distributions which are frequently used in reliability. We present some main as models for specific reliability scenarios. Keywords: Binomial distribution, Exponential distribution

Coolen, Frank

139

Innovative reliability allocation using the maximal entropy ordered weighted averaging method  

Science Journals Connector (OSTI)

Reliability allocation is one of the most important factors to consider when determining the reliability and competitiveness of a product. The feasibility-of-objectives (FOO) technique has become the current standard for assessing reliability designs ... Keywords: Average weighting allocation method, Feasibility-of-objectives technique, Maximal entropy ordered weighted averaging, Reliability allocation

Yung-Chia Chang; Kuie-Hu Chang; Cheng-Shih Liaw

2009-11-01T23:59:59.000Z

140

Reliable quantum computers  

Science Journals Connector (OSTI)

...the performance of a useful quantum computer will need to be. And that in itself...by the Department of Energy under Grant No. DE- FG03-92-ER40701, and...Lond. A (1998) Reliable quantum computers 409 References Aharonov, D. & Ben-Or...

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Wood Durability Service & Reliability  

E-Print Network (OSTI)

Wood Durability Laboratory Service & Reliability Equipment & Facilities Field sites for AWPA E-7 (mold) tests. Wood weathering facilities. Lab-scale pressure treating cylin- ders. X-ray preservative analyzer (Oxford Twin-X). State-of-the-art facilities for wood and plastics composites manufacturing

142

NREL: Photovoltaics Research - Performance and Reliability R&D  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research Search More Search Options Site Map Photo of Photovoltaic Solar Panels. The focus of Photovoltaic (PV) Reliability Research and Development (R&D) at NREL is to improve PV technologies. Modules and systems are tested for long-term performance and stressed in the field and with accelerated testing equipment, all to find R&D solutions to improve PV reliability. Learn about working with us. Help us improve PV systems by providing data in our PV Module Field Failure Database. PV Reliability R&D focuses on three primary areas: Real-time reliability R&D Long-term performance, reliability, and failures of PV components and systems are studied at NREL and through collaborations elsewhere. Analysis is performed to quantify long-term degradation, and

143

32 - Reliability in instrumentation and control  

Science Journals Connector (OSTI)

Publisher Summary Reliability is generally defined as the probability that a component or assembly operates without failure for a prescribed period under specified conditions. To ensure a meaningful result, the conditions of operation, both physical and electrical, must be specified in detail as the standard of performance is required. The chapter also discusses reliability and mean time between failures (MTBF). It is convenient to look for value; the one usually adopted is MTBF. This applies to a maintained system in which each failure is repaired and the equipment is then restored to service. For systems, which cannot be maintained, such as satellite control systems, the value of interest is the mean time to failure (MTTF). Another measure of reliability that is often quoted is failure rate—that is, the number of failures per unit time. This is particularly useful in relation to individual components because it is the most convenient figure to use when estimating the reliability of a complete system in terms of the performance of its components. Equipment manufacturers generally quote MTBF as an indication of reliability as the value does not depend upon the operating period, which is often different for each user. However, reliability is the factor of prime concern to the user, and the relation between this and MTBF is thus important. The simplest case occurs when the failure rate, and thus, MTBF is constant with time.

J. Cluley

2003-01-01T23:59:59.000Z

144

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

145

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

146

Assessment  

NLE Websites -- All DOE Office Websites (Extended Search)

Genetic Genetic Variability of Cell Wall Degradability for the Selection of Alfalfa with Improved Saccharification Efficiency Marc-Olivier Duceppe & Annick Bertrand & Sivakumar Pattathil & Jeffrey Miller & Yves Castonguay & Michael G. Hahn & Réal Michaud & Marie-Pier Dubé # Her Majesty the Queen in Right of Canada 2012 Abstract Alfalfa (Medicago sativa L.) has a high potential for sustainable bioethanol production, particularly because of its low reliance on N fertilizer. We assessed near-infrared reflec- tance spectroscopy (NIRS) as a high-throughput technique to measure cell wall (CW) degradability in a large number of lignified alfalfa stem samples. We also used a powerful immu- nological approach, glycome profiling, and chemical analyses to increase our knowledge of the composition of CW poly- saccharides of alfalfa stems with various levels

147

2010 Transmission Reliability Program Peer Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2010 Transmission Reliability Program Peer Review The Transmission Reliability research area focuses on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. The first area develops monitoring and analysis tools that process synchrophasor data to enable real-time assessment of grid status and stability margins, with the goal of improving power system reliability and visibility through wide-area measurement and control. It is developing advanced technologies and tools to help create a resilient electric transmission system that can better detect disturbances, accommodate a variety of generation sources, and automatically reconfigure the grid to prevent widespread outages and/or rebalance the system. The second area

148

A summary of North American HVDC converter station reliability specifications  

SciTech Connect

This paper summarizes Reliability, Availability, and Maintainability (RAM) specifications that were issued for thyristor based HVDC converter stations in service in North America. A total of twenty project specifications are summarized. A detailed summary by project is shown with specific quantitative requirements categorized. Definitions of terms, representative design principles, and formulas used in calculating RAM parameters contained in existing reliability specifications are presented.

Vancers, I. (ABB Power Systems Inc., Los Angeles, CA (United States)); Hormozi, F.J. (Los Angeles Dept. of Water and Power, CA (United States))

1993-07-01T23:59:59.000Z

149

Substation Configuration Reliability 1 Reliability of Substation Configurations  

E-Print Network (OSTI)

Substation Configuration Reliability 1 Reliability of Substation Configurations Daniel Nack, Iowa substation, it still contains what could be described as weak points or points of failure that would lead to loss of load. By knowing how to calculate the reliability of different substation configurations

McCalley, James D.

150

Increasing the Reliability of Reliability Jochen Brocker1,  

E-Print Network (OSTI)

Increasing the Reliability of Reliability Diagrams Jochen Br¨ocker1, and Leonard A. Smith1,2 1 University Oxford, UK Corresponding Author, cats@lse.ac.uk November 9, 2006 #12;Abstract The reliability; for the most part, ambiguities arise from variation in the distribution of forecast probabilities and from

Stevenson, Paul

151

Reliability Calculus: A Theoretical Framework To Analyze Communication Reliability  

E-Print Network (OSTI)

distribution function (CDF) of the message delays can be used as a metric to infer communication reliability. Note that the communication reliability (end-to-end delay distribution) depends on the delay-to-end delay distribution over possible routes and under different protocols to provide reliability or quality

Liu, Xue

152

Modelling Reliability of Train Arrival Times  

E-Print Network (OSTI)

This paper deals with the scheduling of trains so as to minimise train trip times, whilst maximising reliability of arrival times. The amount of risk of delay associated with a schedule is used as the reliability component of a constrained schedule optimisation model. The paper outlines the model developed to quantify the risk of delays to individual trains, as well as to specific track segments and to the schedule as a whole. The risk model, which deals with single track operations, can be used to estimate the likely impact on reliability of arrival times of changes in train frequencies and operating practices; track and station infrastructure investment strategies; and train technology upgrading. An application of the model to the optimisation of schedules on a track corridor is described. The results obtained using the model are compared with the schedules used by train operations planning staff, in terms of overall delay and timetable reliability. The results highlight the significance of including a measure of timetable reliability, such as risk of delays, in the objective function for scheduling optimisation.

L. Ferreira; A. Higgins

153

Fundamentals of Structural Reliability Theory  

Science Journals Connector (OSTI)

Structural reliability analysis differs in many important ways from reliability analysis as practised in, for example, the electronics and aero-space industries, in spite of the fact that the underlying probab...

Palle Thoft-Christensen Ph. D.…

1982-01-01T23:59:59.000Z

154

FIELD RELIABILITY OF ELECTRONIC SYSTEMS  

E-Print Network (OSTI)

: ELECTRONIC EQUIPMENT; FAILURES; RELIABILITY; RISK ANALYSIS; SYSTEM ANALYSIS UDC: 621.38.004.64 ISBN 87 Predicted and Observed Reliability 16 3.3. Source 3 16 3.3.1. Description (Reactor Gamma Monitor) 16 3I Ww i 1 i FIELD RELIABILITY OF ELECTRONIC SYSTEMS wcwotoias R I S 0 - M - 2 4 1 8 An analytical

155

Testing for PV Reliability (Presentation)  

SciTech Connect

The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

Kurtz, S.; Bansal, S.

2014-09-01T23:59:59.000Z

156

2014 Annual Planning Summary for the Office of Electricity and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Electricity and Energy Reliability.

157

2011 Annual Planning Summary for Electricity Delivery and Energy Reliability (OE)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Electricity Delivery and Energy Reliability (OE).

158

Euro Working Group on Transportation 2014 Isolating Different Factors Affecting Travel Time Reliability in an  

E-Print Network (OSTI)

distribution, differently according to the lane. As reliability is based on the percentiles (and not only and tre results are presented in this paper. Keywords: assessment; travel time; reliability;percentile;distribution Reliability in an Observational Before/After Study Neïla Bhouri*, Maurice Aron IFSTTAR,COSYS/GRETTIA, 14-20 bd

Boyer, Edmond

159

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

160

2013 Transmission Reliability Program Peer Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability Program Peer Review Transmission Reliability Program Peer Review 2013 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations are available through the individual session links. The agenda and introduction by Joe Eto, LBNL, are available below. Day 1: June 27 Session I Baselining Studies and Analysis, Bharat Bhargava, EPG Baselining Studies and Analysis, Brett Amidan, PNNL Synchrophasor Standards Support and Development, Ken Martin, EPG Session II Advanced Synchrophasor Metrology, Stan Hadley, ORNL GPS Issue Management, Mark Buckner, ORNL Technology Assessment for Next Generation PMU, Mark Buckner, ORNL Session III Measurement-Based Stability Assessment, Dan Trudnowski, U. Montana

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

The design of a reliable reputation system  

E-Print Network (OSTI)

a peer reliability metric based on the distribution ofa higher reliability score. The most reliable distribution,distribution for the Sybil colluder and a sharp drop in its reliability

Swamynathan, Gayatri; Almeroth, Kevin C.; Zhao, Ben Y.

2010-01-01T23:59:59.000Z

162

Texas Uses Phasors to Increase Electricity Reliability | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uses Phasors to Increase Electricity Reliability Uses Phasors to Increase Electricity Reliability Texas Uses Phasors to Increase Electricity Reliability March 31, 2011 - 12:57pm Addthis Merrill Smith Program Manager, Office of Electricity Delivery & Energy Reliability What does this mean for me? Phasor measurement units are part of a comprehensive approach to managing the variability from renewable sources, particularly wind. This project will enable more effective use of renewable energy sources by helping to illustrate solutions for managing unpredictability and promote reliability on the grid. As any businessperson will tell you, a key to long-term success is the ability to foresee potential problems and limit risk. In the electricity industry this ability can prevent grid events, like unexpected

163

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy

164

2012 Reliability & Markets Peer Review - Full Presentations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability & Markets Peer Review - Full Presentations Reliability & Markets Peer Review - Full Presentations 2012 Reliability & Markets Peer Review - Full Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. The full presentations are available below. Presentation summaries are also available. 2012 R&M Peer Review - Transmission Investment Assessment Under Uncertainty - Ben Hobbs 2012 R&M Peer Review - Renewable Integration Through Risk-Limiting Dispatch - Pravin Varaiya 2012 R&M Peer Review - Development and Testing of New Tools - Ray Zimmerman 2012 R&M Peer Review - Commercialization of the SuperOPF Framework - Hsiao-Dong Chiang 2012 R&M Peer Review - Essence of Structure Preserving Network Reductions -

165

2012 Reliability & Markets Peer Review | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability & Markets Peer Review Reliability & Markets Peer Review 2012 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentations and summaries are available through the links and the agenda is included below. Summaries | Full Presentations Day 1: August 7 Transmission Investment Assessment Under Uncertainty About Fuel Prices, Technology, Renewables Penetration and Market Responses Using a Multi-State Stochastic Model Approach with Recourse Renewable Integration Through Risk-Limiting Dispatch and Distributed Resource Aggregations Development and Testing of New Tools Commercialization of the SuperOPF Framework: Phase 2 Essence of Structure Preserving (ESP) Network Reductions for

166

Reliability and component importance analysis of substation automation systems  

Science Journals Connector (OSTI)

This paper aims to present a comprehensive technique to quantitatively assess the reliability of substation automation systems. The technique is based on the tie-sets methodology. In order to demonstrate the application of the proposed technique, a variety of substation automation architectures is first introduced. The associated reliability block diagrams as well as the exact system reliability are then given. The impacts and the degree of importance of various components on the reliability of substation automation systems are presented. Two suitable measures of importance are selected. The first is the Birnbaum’s measure used to determine the bottleneck of the system reliability. The second measure uses criticality importance to diagnose failures and generating repair or inspection checklists.

Hamze Hajian-Hoseinabadi

2013-01-01T23:59:59.000Z

167

North American Electric Reliability Corporation Interconnections...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

168

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information...

169

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting,...

170

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

171

Gas-insulated substations: Reliability Research Program: Volume 1, Operational characteristics and recommendations: Final report  

SciTech Connect

This volume contains a comparative evaluation of existing transmission system reliability programs (SYREL, GATOR, RECS) and relevant mathematical methods for transmission reliability analysis. Several new and enhanced methods in the areas of network analysis, contingency selection, remedial action, and reliability index calculation, developed and tested during the project, are described. Recommendations for methods to be used in a production grade transmission reliability assessment program are presented. 49 figs., 11 tabs.

Boggs, S.A.; Chu, F.Y.; Collod, M.; Ford, G.L.; Fujimoto, N.; Harvey, S.; Stuckless, H.A.

1988-01-01T23:59:59.000Z

172

A fuzzy expert system for the human reliability analysis of crews in simulated nuclear emergency procedures  

Science Journals Connector (OSTI)

The use of Human Reliability Analysis (HRA) for a particular safety assessment is still a difficult problem. In order to perform a comparison of the available methods, the best approach is simulation. In this regard, the pilot study proposed by the Organisation for Economic Co-operation and Development (OECD) Halden Reactor Project (HRP) is intended to provide a first guidance in HRA methods evaluation through experimental data on crew performance in simulated scenarios. The quantitative evaluation of the results of these simulations in terms of crew performance and Human Error Probabilities (HEPs) is quite a difficult task. In this paper, a fuzzy expert system for systematically assessing crew performance is presented. The feasibility of the method is proved on a case study concerning a scenario of an incomplete scram in a Boiling Water Reactor (BWR).

E. Zio; P. Baraldi; M. Librizzi

2010-01-01T23:59:59.000Z

173

Fuzzy Failure Rate for Nuclear Power Plant Probabilistic Safety Assessment by Fault Tree Analysis  

Science Journals Connector (OSTI)

Reliability data is essential for a nuclear power plant probabilistic safety assessment by fault tree analysis ... a failure possibility-based reliability algorithm to assess nuclear event reliability data from f...

Julwan Hendry Purba; Jie Lu; Guangquan Zhang

2012-01-01T23:59:59.000Z

174

2014 Reliability & Markets Peer Review  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability R&D Reliability & Markets Peer Review included 15 presentations over 2 days on August 5 - 6, 2014 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are available to download.

175

NREL: Gearbox Reliability Collaborative - About the Gearbox Reliability  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Gearbox Reliability Collaborative About the Gearbox Reliability Collaborative Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines field testing, dynamometer testing, analysis, modeling, condition monitoring, development of a failure database, and operations and maintenance research in a multi-pronged approach to determine why wind turbine gearboxes do not always achieve their expected design life-the time period that manufacturers expect them to last. The collaborative of manufacturers, owners, operators, researchers, and consultants focuses on gearbox modeling and testing and the development of a gearbox failure database. Collaborative members also investigate gearbox

176

Performance and Reliability of Quantum Cascade Lasers  

SciTech Connect

We present the burn-in behavior and power stability of multiple quantum cascade lasers (QCLs) that were measured to investigate their long-term performance. For these experiments, the current to the QCL was cycled every ten minutes, and the output power was monitored over time for durations as long as two months. A small increase in power for a given injection current is observed for almost all of the QCLs tested during the burn-in period. The data from these experiments will be presented along with the effects of packaging the QCLs to determine the impact on performance and reliability.

Myers, Tanya L.; Cannon, Bret D.; Taubman, Matthew S.; Bernacki, Bruce E.

2013-05-01T23:59:59.000Z

177

Final report on reliability and lifetime prediction.  

SciTech Connect

This document highlights the important results obtained from the subtask of the Goodyear CRADA devoted to better understanding reliability of tires and to developing better lifetime prediction methods. The overall objective was to establish the chemical and physical basis for the degradation of tires using standard as well as unique models and experimental techniques. Of particular interest was the potential application of our unique modulus profiling apparatus for assessing tire properties and for following tire degradation. During the course of this complex investigation, extensive relevant information was generated, including experimental results, data analyses and development of models and instruments. Detailed descriptions of the findings are included in this report.

Gillen, Kenneth Todd; Wise, Jonathan; Jones, Gary D.; Causa, Al G. [Goodyear Tire and Rubber Co., Akron, OH; Terrill, Edward R. [Goodyear Tire and Rubber Co., Akron, OH; Borowczak, Marc [Goodyear Tire and Rubber Co., Akron, OH

2012-12-01T23:59:59.000Z

178

Reliability-based synthesis of non-linear stochastic dynamical systems: a global approximation approach  

Science Journals Connector (OSTI)

The paper presents an efficient methodology to carry out reliability-based structural optimisation of non-linear systems under stochastic loading. The optimisation problem is formulated as the minimisation of an objective function subject to multiple reliability constraints. The reliability constraints are given in terms of first excursion probabilities with large state-space dimensions. A sequential approximate optimisation scheme based on global approximations of the reliability constraints is implemented in the proposed formulation. The approximations of the first excursion probabilities in terms of the design variables are constructed by combining a global mixed linearisation approach with a reliability sensitivity analysis. The sensitivity of the first excursion probabilities are estimated by considering some statistics of an augmented reliability problem. The number of reliability estimations required during the optimal design process is generally very small. Two numerical examples are presented to illustrate the effectiveness of the method.

Hector A. Jensen; Macarena S. Ferre; Danilo S. Kusanovic

2010-01-01T23:59:59.000Z

179

Reliability analysis of steel-containment strength  

SciTech Connect

A best estimate and uncertainty assessment of the resistance of the St. Lucie, Cherokee, Perry, WPPSS and Browns Ferry containment vessels was performed. The Monte Carlo simulation technique and second moment approach were compared as a means of calculating the probability distribution of the containment resistance. A uniform static internal pressure was used and strain ductility was taken as the failure criterion. Approximate methods were developed and calibrated with finite element analysis. Both approximate and finite element analyses were performed on the axisymmetric containment structure. An uncertainty assessment of the containment strength was then performed by the second moment reliability method. Based upon the approximate methods, the cumulative distribution for the resistance of each of the five containments (shell modes only) is presented.

Greimann, L.G.; Fanous, F.; Wold-Tinsae, A.; Ketalaar, D.; Lin, T.; Bluhm, D.

1982-06-01T23:59:59.000Z

180

Photovoltaics performance and reliability workshop  

SciTech Connect

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. (ed.) [ed.

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

On the Fatigue Reliability of Hydroelectric Francis Runners  

Science Journals Connector (OSTI)

Abstract The reliability assessment of large rotating structures like hydroelectric Francis runners is often limited by our capacity to define a proper limit state combined with a relevant degradation model. In this paper, we propose that the proper limit state for fatigue reliability of such structures is the onset of high cycle fatigue (HCF). Based on this premise, a prior interval for our limit state based on available literature is presented. The prior assumptions are believed to be the first step toward validation of the applicability and suitability of the proposed model. The paper includes an overview of the theoretical background for reliability assessment of Francis turbine runners, the methodology used, and the results obtained from the information gathered from the available literature.

Martin Gagnon; Antoine Tahan; Philippe Bocher; Denis Thibault

2013-01-01T23:59:59.000Z

182

DAKOTA reliability methods applied to RAVEN/RELAP-7.  

SciTech Connect

This report summarizes the result of a NEAMS project focused on the use of reliability methods within the RAVEN and RELAP-7 software framework for assessing failure probabilities as part of probabilistic risk assessment for nuclear power plants. RAVEN is a software tool under development at the Idaho National Laboratory that acts as the control logic driver and post-processing tool for the newly developed Thermal-Hydraulic code RELAP-7. Dakota is a software tool developed at Sandia National Laboratories containing optimization, sensitivity analysis, and uncertainty quantification algorithms. Reliability methods are algorithms which transform the uncertainty problem to an optimization problem to solve for the failure probability, given uncertainty on problem inputs and a failure threshold on an output response. The goal of this work is to demonstrate the use of reliability methods in Dakota with RAVEN/RELAP-7. These capabilities are demonstrated on a demonstration of a Station Blackout analysis of a simplified Pressurized Water Reactor (PWR).

Swiler, Laura Painton; Mandelli, Diego [Idaho National Laboratory, Idaho Falls, ID; Rabiti, Cristian [Idaho National Laboratory, Idaho Falls, ID; Alfonsi, Andrea [Idaho National Laboratory, Idaho Falls, ID

2013-09-01T23:59:59.000Z

183

Constructing Reliable Distributed Communication Systems with CORBA  

E-Print Network (OSTI)

Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C Communication software and distributed services for next- generation applications must be reliable, efficient model to support reliable data- and process- oriented distributed systems that communicate through syn

Schmidt, Douglas C.

184

Loan Terms  

Energy.gov (U.S. Department of Energy (DOE))

The following terms are important to understand and use confidently as you discuss, negotiate, and finalize details of the clean energy loan product with the selected financial institution partners. You will need to negotiate loan origination procedures, interest rates, loan tenors, underwriting guidelines, and other terms outlined below.

185

Reliability study of a special decay heat removal system of a gas-cooled fast reactor demonstrator  

Science Journals Connector (OSTI)

Abstract The European roadmap toward the development of generation IV concepts addresses the safety and reliability assessment of the special system designed for decay heat removal of a gas-cooled fast reactor demonstrator (GFRD). The envisaged system includes the combination of both active and passive means to accomplish the fundamental safety function. Failure probabilities are calculated on various system configurations, according to either pressurized or depressurized accident events under investigation, and integrated with probabilities of occurrence of corresponding hardware components and natural circulation performance assessment. The analysis suggests the improvement of measures against common cause failures (CCF), in terms of an appropriate diversification among the redundant systems, to reduce the system failure risk. Particular emphasis is placed upon passive system reliability assessment, being recognized to be still an open issue, and the approach based on the functional reliability is adopted to address the point. Results highlight natural circulation as a challenging factor for the decay heat removal safety function accomplishment by means of passive devices. With the models presented here, the simplifying assumptions and the limited scenarios considered according to the level of definition of the design, where many systems are not yet established, one can conclude that attention has to be paid to the functional aspects of the passive system, i.e. the ones not pertaining to the “hardware” of the system. In this article the results of the analysis are discussed, where the effects of the analytical assumptions, design options, accident managements on the reliability are examined. The design diversity of the components undergoing \\{CCFs\\} can be effective for the improvement and some accident management measures are also possible by making use of the long grace period in GFRD.

Luciano Burgazzi

2014-01-01T23:59:59.000Z

186

Reliability Modeling and Evaluation in Aging Power Systems  

E-Print Network (OSTI)

Renewal process has been often employed as a mathematical model of the failure and repair cycle of components in power system reliability assessment. This implies that after repair, the component is assumed to be restored to be in as good as new...

Kim, Hag-Kwen

2010-01-14T23:59:59.000Z

187

Smart Grid Investments Improve Grid Reliability, Resilience,...  

Energy Savers (EERE)

Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November...

188

Electricity & Energy Reliability (WFP) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity & Energy Reliability (WFP) Electricity & Energy Reliability (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

189

ELECTRICITY DELIVERY AND ENERGY RELIABILITY Appropriation Overview  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ELECTRICITY DELIVERY AND ENERGY RELIABILITY Appropriation Overview Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy...

190

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mechanical Reliability Thermoelectric Mechanical Reliability 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

191

Thermoelectric Materials By Design: Mechanical Reliability (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Materials By Design: Mechanical Reliability (Agreement 14957) Thermoelectric Materials By Design: Mechanical Reliability (Agreement 14957) Presentation from the U.S. DOE Office of...

192

Electronic reliability estimation: how reliable are the results?  

Science Journals Connector (OSTI)

The development of Safety Critical Systems requires the compliance to several safety standards and regulations. Since, most of the times, human life is at stake, it is crucial to fully understand the behaviour of the system being developed in order to ... Keywords: MIL-Hdbk-217F, MTTF, estimation, reliability

Nuno Silva; Rui Lopes

2012-09-01T23:59:59.000Z

193

Fault Tolerant Reliable Delivery of Events in Distributed Middleware Systems Shrideep Pallickara, Geoffrey Fox and Hasan Bulut  

E-Print Network (OSTI)

Fault Tolerant Reliable Delivery of Events in Distributed Middleware Systems Shrideep Pallickara our scheme for the reliable delivery of events within NaradaBrokering [1-5], which is a distributed Abstract Reliable delivery of events (or messages, where the terms messages and events are used

194

Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Office of Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy infrastructure while working to enable innovation across the energy sector, empowering American consumers, and securing our energy future. The OE mission and the leadership role OE plays in the energy industry directly support the President's effort to accelerate the transformation of America's energy system

195

Producing reliable software: an experiment  

Science Journals Connector (OSTI)

A customer of high assurance software recently sponsored a software engineering experiment in which a small real-time software system was developed concurrently by two popular software development methodologies. One company specialized in the state-of-the-practice ... Keywords: capability maturity model, cleanroom certification, formal methods, software development methodologies, software engineering experiment, software process and product metrics, software reliability

Carol Smidts; Xin Huang; James C. Widmaier

2002-04-01T23:59:59.000Z

196

Reliability-based optimization using evolutionary algorithms  

Science Journals Connector (OSTI)

Uncertainties in design variables and problem parameters are often inevitable and must be considered in an optimization task if reliable optimal solutions are sought. Besides a number of sampling techniques, there exist several mathematical approximations ... Keywords: Ditlevsen's bound, Pareto-optimal front, evolutionary multiobjective optimization, most probable point, reliability-based optimization, reliable front, system reliability

Kalyanmoy Deb; Shubham Gupta; David Daum; Jürgen Branke; Abhishek Kumar Mall; Dhanesh Padmanabhan

2009-10-01T23:59:59.000Z

197

Real Time Grid Reliability Management 2005  

SciTech Connect

The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

2008-07-07T23:59:59.000Z

198

Reliability and Markets Program Information | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability and Markets Program Information Reliability and Markets Program Information Summary of the Tranmission Reliability program's Reliability and Markets activity area. The...

199

DOE Human Reliability Program Removals Report 2004-2006  

SciTech Connect

This report presents results of the comprehensive data analysis and assessment of all U.S. Department of Energy (DOE) and National Nuclear Security Administration (NNSA) facilities that have positions requiring workers to be certified in the Human Reliability Program (HRP). Those facilities include: Albuquerque, Amarillo, DOE Headquarters, Hanford, Idaho, Nevada, Oak Ridge, Oakland, and Savannah River. The HRP was established to ensure, through continuous review and evaluation, the reliability of individuals who have access to the DOE’s most sensitive facilities, materials, and information.

Center for Human Reliability Studies

2007-02-01T23:59:59.000Z

200

Reliability evaluation for large-scale bulk transmission systems: Volume 1, Comparative evaluation, method development, and recommendations: Final report  

SciTech Connect

This volume (1 of 2) contains a comparative evaluation of existing transmission system reliability programs (SYREL, GATOR, RECS) and relevant mathematical methods for transmission reliability analysis. Several new and enhanced methods in the areas of network analysis, contingency selection, remedial action, and reliability index calculation, developed and tested during the project, are described. Recommendations for methods to be used in a production grade transmission reliability assessment program are presented. 69 figs., 41 tabs.

Lam, B.P.; Lawrence, D.J.; Reppen, N.D.; Ringlee, R.J.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Enhancing co-design reliability by inter-organizational learning and loose coupling  

E-Print Network (OSTI)

Enhancing co-design reliability by inter- organizational learning and loose coupling concepts Colin and their potential outcomes (in terms of organizational learning, cooperative effect and consequences). We propose-design reliability model, organizational learning, loose coupling, informal cooperative practices, self

Paris-Sud XI, Université de

202

Research Opportunities in Reliability of Photovoltaic Modules (Presentation)  

SciTech Connect

The motivation for an increased scope and a more proactive effort in reliability research of photovoltaic modules and systems includes reducing the levelized cost of energy and gaining better confidence in the energy and financial payback for photovoltaic systems. This increased reliability and confidence will lead to greater penetration of photovoltaics in the energy portfolio and greater employment in photovoltaics and related industries. Present research needs include the fundamental degradation mechanisms of polymers, connectors and other module components, mapping of failure mechanisms observed in the field to those in accelerated lifetime tests, determining the acceleration factors, and improving standards for modules such that tests can appropriately be assigned to evaluate their long term durability. Specific mechanisms discussed are corrosion in module components, metastability in thin-film active layers, delamination and loss of elastic properties in module polymeric materials, and inverter failure. Presently, there is hiring of reliability scientists and engineers at many levels of the value chain for photovoltaics.

Hacke, P.

2010-05-01T23:59:59.000Z

203

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Presentations 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy Resources - Kameshwar Poolla, UC Berkeley

204

Structural Reliability: Assessing the Condition and Reliability of Casing in Compacting Reservoirs  

E-Print Network (OSTI)

compaction reservoirs typically are composed of unconsolidated, overpressured rocks such as chalk, diatomite, and sandstone. Pore pressure depletion increases effective stress, which is the rock matrix stress pushing upward against overburden pressure...

Chantose, Prasongsit

2012-02-14T23:59:59.000Z

205

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

206

NREL: Wind Research - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research Search More Search Options Site Map Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database in a multi-pronged approach to determine why many wind turbine gearboxes do not achieve their expected design life-the time period that manufacturers expect them to last. Read about: The Gearbox Reliability Collaborative Gearbox Reliability Collaborative Projects Gearbox Reliability Collaborative Research and Development Working with the Gearbox Reliability Collaborative Gearbox Reliability Collaborative Publications

207

Microgrids and Heterogeneous Security, Quality, Reliability, and Availability  

E-Print Network (OSTI)

and Energy Reliability, Distribution System Integrationand Energy Reliability, Distribution System Integration

Marnay, Chris

2007-01-01T23:59:59.000Z

208

Understanding Bulk Power Reliability: The Importance of Good Data and A  

NLE Websites -- All DOE Office Websites (Extended Search)

Understanding Bulk Power Reliability: The Importance of Good Data and A Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources Title Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources Publication Type Report Year of Publication 2012 Authors Fisher, Emily, Joseph H. Eto, and Kristina Hamachi LaCommare Pagination 11 Date Published 01/2012 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department, power system reliability, power system reliability metrics, transmission system reliability Abstract Bulk power system reliability is of critical importance to the electricity sector. Complete and accurate information on events affecting the bulk power system is essential for assessing trends and efforts to maintain or improve reliability. Yet, current sources of this information were not designed with these uses in mind. They were designed, instead, to support real-time emergency notification to industry and government first-responders. This paper reviews information currently collected by both industry and government sources for this purpose and assesses factors that might affect their usefulness in supporting the academic literature that has relied upon them to draw conclusions about the reliability of the US electric power system.

209

Modelling in industrial maintenance and reliability  

Science Journals Connector (OSTI)

......of modelling the reliability of wind turbines and some critical subsystems from...change, through the years, in wind turbines reliability. There were major...research on determining optimal maintenance policies for deteriorating systems......

Wenbin Wang

2010-10-01T23:59:59.000Z

210

Reliability analysis reloaded: how will we survive?  

Science Journals Connector (OSTI)

In safety related applications and in products with long lifetimes reliability is a must. Moreover, facing future technology nodes of integrated circuit device level reliability may decrease, i.e., counter-measures have to be taken to ensure product ...

Robert Aitken; Görschwin Fey; Zbigniew T. Kalbarczyk; Frank Reichenbach; Matteo Sonza Reorda

2013-03-01T23:59:59.000Z

211

LUNAR MASS SPECTROMETER RELIABILITY LOGIC DIAGRAM  

E-Print Network (OSTI)

point (A) to (F). The block diagram also defines the reliability functions for the purpose of FMEA 1

Rathbun, Julie A.

212

Human Reliability Analysis for Small Modular Reactors  

SciTech Connect

Because no human reliability analysis (HRA) method was specifically developed for small modular reactors (SMRs), the application of any current HRA method to SMRs represents tradeoffs. A first- generation HRA method like THERP provides clearly defined activity types, but these activity types do not map to the human-system interface or concept of operations confronting SMR operators. A second- generation HRA method like ATHEANA is flexible enough to be used for SMR applications, but there is currently insufficient guidance for the analyst, requiring considerably more first-of-a-kind analyses and extensive SMR expertise in order to complete a quality HRA. Although no current HRA method is optimized to SMRs, it is possible to use existing HRA methods to identify errors, incorporate them as human failure events in the probabilistic risk assessment (PRA), and quantify them. In this paper, we provided preliminary guidance to assist the human reliability analyst and reviewer in understanding how to apply current HRA methods to the domain of SMRs. While it is possible to perform a satisfactory HRA using existing HRA methods, ultimately it is desirable to formally incorporate SMR considerations into the methods. This may require the development of new HRA methods. More practicably, existing methods need to be adapted to incorporate SMRs. Such adaptations may take the form of guidance on the complex mapping between conventional light water reactors and small modular reactors. While many behaviors and activities are shared between current plants and SMRs, the methods must adapt if they are to perform a valid and accurate analysis of plant personnel performance in SMRs.

Ronald L. Boring; David I. Gertman

2012-06-01T23:59:59.000Z

213

Reliability Considerations from Integration of Smart Grid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Considerations Considerations from the Integration of Smart Grid 116-390 Village Blvd., Princeton, NJ 08540 609.452.8060 | 609.452.9550 fax www.nerc.com the reliability of the to ensure bulk power system December 2010 (This page intentionally left blank) to ensure the reliability of the bulk power system Reliability Considerations of Integration of Smart Grid i

214

The Whereabouts of Reliability Education: Challenges & Opportunities  

E-Print Network (OSTI)

. There is a gap between reliability theory and practice, between school and industry, book knowledge and real The probability that the system is still operating at time t. where f(t) probability density function h(t) failure changing and getting higher. #12;Some Reliability books in ... 1960s Igor Bazovsky (1961), Reliability

Bernstein, Joseph B.

215

SAFETY AND RELIABILITY ANALYSIS OF NUCLEAR REACTORS  

Science Journals Connector (OSTI)

Abstract A survey of the various aspects of safety and reliability analysis of nuclear reactors is presented with particular emphasis on the interrelation between structural reliability and systems reliability. In reactor design this interrelation is of overriding importance since it is the task of the control, protective and containment systems to protect the mechanical system and the structure from accidental overloading.

T.A. JAEGER

1972-01-01T23:59:59.000Z

216

Bayesian Networks in Reliability Analysis Helge Langseth  

E-Print Network (OSTI)

Bayesian Networks in Reliability Analysis Helge Langseth Dept. Computer and Information Sciences Bayesian network (BN) models gain more and more popularity in reliability analysis. In this talk I reliability measures concerning a low pressure coolant injection system for a nuclear reactor (a problem

Langseth, Helge

217

RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION  

E-Print Network (OSTI)

RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION Richard Hardin1 , K.K. Choi1 , and Christoph 52242-1527 Keywords: Casting Process Design, Optimization, Reliability-Based Design Optimization purpose reliability-based design optimization (RBDO) software tool previously developed at the University

Beckermann, Christoph

218

Measuring Improved Reliability in Stochastic Systems  

E-Print Network (OSTI)

for such a path, this represents a better measure of the path's reliability. If the distribution were asymmetricMeasuring Improved Reliability in Stochastic Systems Jeremy Bradley \\Lambda Neil Davies y 30 June 1999 Abstract In this paper, we examine reliability of stochastic systems with specific application

Bradley, Jeremy

219

Reliability assessment of electrical power systems using genetic algorithms  

E-Print Network (OSTI)

of the dissertation, a GA based method for state sampling of composite generation-transmission power systems is introduced. Binary encoded GA is used as a state sampling tool for the composite power system network states. A linearized optimization load flow model...

Samaan, Nader Amin Aziz

2004-11-15T23:59:59.000Z

220

Reliability based assessment of FRP rehabilitation of reinforced concrete girders  

E-Print Network (OSTI)

2006]. The overall material resistance factor used in designused to characterize a material’s resistance to that type ofresistance and accounts for the variation in materials,

Wilcox, Patrick Carlo

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Assessing Reliability of Substation Spare Current Transformer System  

Science Journals Connector (OSTI)

This paper relates a case study involving Current Transformers (CTs) from the electrical system of the Companhia Hidro Elétrica do São Francisco (CHESF) in order to estimate the optimum number of spare. Two mo...

Cristiano G. de Melo; Renata Maria Cardoso R. de Souza…

2012-01-01T23:59:59.000Z

222

RELIABILITY OF WIND POWER FROM DISPERSED SITES: A PRELIMINARY ASSESSMENT  

E-Print Network (OSTI)

POWER FREQUENCY TO LOSS-OF-LOAD PROBABIL ITY The Basic Steps Optimization of Various Kinds WIND DATA

Kahn, E.

2011-01-01T23:59:59.000Z

223

Smart Grid Reliability Assessment Under Variable Weather Conditions.  

E-Print Network (OSTI)

??The needs of contemporary electric utility customers and expectations regarding energy supply require dramatic changes in the way energy is transmitted and delivered. A smart… (more)

Islam, Arif

2009-01-01T23:59:59.000Z

224

Reliability based assessment of FRP rehabilitation of reinforced concrete girders  

E-Print Network (OSTI)

and failure type, and acceptable risk. Resistance factorsfailure mechanism, and acceptable risk for that failureso that an acceptable level of risk is incorporated in

Wilcox, Patrick Carlo

2008-01-01T23:59:59.000Z

225

Probabilistic Wind Resource Assessment and Power Predictions  

E-Print Network (OSTI)

Probabilistic Wind Resource Assessment and Power Predictions Luca Delle Monache (lucadm Accurate wind resource assessment and power forecasts and reliable quanXficaXon of their uncertainty Mo5va5on · Power forecast: o Increase wind energy penetra

Firestone, Jeremy

226

Philosophy on Vulnerability Assessments  

NLE Websites -- All DOE Office Websites (Extended Search)

capabilities/vat/assess/ capabilities/vat/assess/ ARGONNE NATIONAL LABORATORY, Nuclear Engineering Division, 9700 South Cass Ave., Argonne, IL Philosophy on Vulnerability Assessments Argonne Vulnerability Assessment Team Roger G. Johnston, Ph.D., CPP , 630-252-6168 1. There are a number of conventional tools for finding security vulnerabilities. These include security surveys, risk management, design basis threat, CARVER Method, Delphi Method, software vulnerability assessment tools, infrastructure modeling, etc. 2. These tools have some value, and indeed we have used them all. 3. Experience has shown, however, that these methods do not usually result in dramatic improvements to security, nor do they reliably predict catastrophic security incidents that

227

Risk & Reliability Analysis | Global and Regional Solutions  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Analysis Group Risk Analysis Group Assessing Potential Hazards in Complex Systems Since the mid-1980s, a core group of Brookhaven scientists has been carrying out risk and reliability assessments of commercial nuclear power plants and other complex technological systems. These scientists - now called the Risk Analysis Group -- have also conducted reviews of risk assessments performed by others, such as utilities, to provide objective assessments to government regulators. Historically, the largest sponsor and customer of the group has been the US Nuclear Regulatory Commission (NRC) but staff members have also performed risk analyses for other domestic agencies such as the Department of Energy (DOE), the Federal Aviation Administration, and the New York State Department of Transportation.

228

Utility View of Risk Assessment  

E-Print Network (OSTI)

This paper will address a utility perspective in regard to risk assessment, reliability, and impact on the utility system. Discussions will also include the critical issues for utilities when contracting for energy and capacity from cogenerators...

Bickham, J.

229

Software reliability models for critical applications  

SciTech Connect

This report presents the results of the first phase of the ongoing EG&G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

Pham, H.; Pham, M.

1991-12-01T23:59:59.000Z

230

Software reliability models for critical applications  

SciTech Connect

This report presents the results of the first phase of the ongoing EG G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

Pham, H.; Pham, M.

1991-12-01T23:59:59.000Z

231

IEEE TRANSACTIONS ON RELIABILITY, VOL. 38, NO. 1,1989 APRIL 103 Reliable Protocols for Distributed  

E-Print Network (OSTI)

IEEE TRANSACTIONS ON RELIABILITY, VOL. 38, NO. 1,1989 APRIL 103 Reliable Protocols for Distributed-tolerance, Message complexity, Reliable protocol Reader Aids - Purpose: Design reliable distributed protocols Special Termination Detection S. Venkatesan University of Pittsburgh, Pittsburgh Key Words - Distributed system, Fault

Venkatesan, S.

232

Interoperability between a dynamic reliability modeling and a Systems Engineering process Principles and Case Study  

E-Print Network (OSTI)

element for interoperability with the tools and activities required for a dynamic reliability assessment. The case study is the dynamic assessment of availability of a feed-water control system in a power plant steam generator, presented in previous articles. Keywords: Systems engineering, systems modeling, RAMS

Paris-Sud XI, Université de

233

Integrated assessment of quality of supply in future electricity networks   

E-Print Network (OSTI)

Although power system reliability analysis is a mature research area, there is a renewed interest in updating available network models and formulating improved reliability assessment procedures. The main driver of this ...

Hernando Gil, Ignacio

2014-11-27T23:59:59.000Z

234

High reliability plastic packaging for microelectronics  

SciTech Connect

Goal was Assembly Test Chips (ATCs) which could be used for evaluating plastic encapsulation technologies. Circuits were demonstrated for measuring Au-Al wirebond and Al metal corrosion failure rates during accelerated temperature and humidity testing. The test circuits on the ATC02.5 chip were very sensitive to extrinsic or processing induced failure rates. Accelerated aging experiments were conducted with unpassivated triple track Al structures on the ATC02.6 chip; the unpassivated tracks were found to be very sensitive to particulate contamination. Some modifications to existing circuitry were suggested. The piezoresistive stress sensing circuitry designed for the ATC04 test chip was found suitable for determining the change in the state of mechanical stress at the die when both initial and final measurements were made near room temperature (RT). Attempt to measure thermal stress between RT and a typical polymer glass transition temperature failed because of excessive die resistor- substrate leakage currents at the high temperature end; suitable circuitry changes were developed to overcome this problem. One temperature and humidity experiment was conducted with Sandia developed static radom access memory parts to examine non-corrosion CMOS failures; this objective was not achieved, but corrosion failure at the metal to Si contacts on the die surface could be detected. This 2-year effort resulted in new designs for test circuits which could be used on an advanced ATC for reliability assessment in Defense Programs electronics development projects.

Sweet, J.N.; Peterson, D.W.; Hsia, A.H.; Tuck, M.

1997-07-01T23:59:59.000Z

235

2014 DOE Human Reliability Program (HRP) Workshop | Department...  

Office of Environmental Management (EM)

DOE Human Reliability Program (HRP) Workshop 2014 DOE Human Reliability Program (HRP) Workshop August 18, 2014 - 7:51am Addthis 2014 DOE Human Reliability Program (HRP) Workshop...

236

Electricity Delivery and Energy Reliability | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Delivery and Energy Reliability Electricity Delivery and Energy Reliability information about the delivery of electricity and energy reliability Electricity Delivery...

237

Hybrid reliability model for nuclear reactor safety system  

Science Journals Connector (OSTI)

The dependability of critical safety systems needs to be quantitatively determined in order to verify their effectiveness, e.g. with regard to regulatory requirements. Since modular redundant safety systems are not required for normal operation, their reliability is strongly dependent on periodic inspection. Several modeling methods for the quantitative assessment of dependability are described in the literature, with a broad variation in complexity and modeling power. Static modeling techniques such as fault tree analysis (FTA) or reliability block diagrams (RBD) are not capable of capturing redundancy and repair or test activities. Dynamic state space based models such as continuous time Markov chains (CTMC) are more powerful but often result in very large, intractable models. Moreover, exponentially distributed state residence times are not a correct representation of actual residence times associated with repair activities or periodic inspection. In this study, a hybrid model combines a system level RBD with a CTMC to describe the dynamics. The effects of periodic testing are modeled by redistributing state probabilities at deterministic test times. Applying the method to the primary safety shutdown system of the BR2(Belgian Reactor 2)—nuclear research reactor, resulted in a quantitative as well as a qualitative assessment of its reliability.

Steven Verlinden; Geert Deconinck; Bernard Coupé

2012-01-01T23:59:59.000Z

238

Predictive calculations to assess the long-term effect of cementitious materials on the pH and solubility of uranium(VI) in a shallow land disposal environment  

SciTech Connect

One proposed method of low-level radioactive waste (LLW) disposal is to mix the radioactive waste streams with cement, place the mixture in steel barrels, and dispose of the barrels in near-surface unsaturated sediments. Cement or concrete is frequently used in burial grounds, because cement porewaters are buffered at high pH values and lanthanides and actinides; are very insoluble in highly alkaline environments. Therefore, leaching of these contaminants from the combined cement/low-level radioactive waste streams will at least initially be retarded. The calculations performed in this study demonstrate that the pH of cement porewaters will be maintained at a value greater than 10 for 10,000 years under Hanford specific hydrogeochemical conditions. Ten thousand years is the period generally studied in longterm performance assessments per regulatory guidance. The concentrations of dissolved hexavalent uranium [U(VI)], the valence form of dissolved U usually present in oxidizing surface and groundwaters, are also constrained by the high pH and predicted solution compositions over the 10,000-year period, which is favorable from a long-term performance perspective.

Criscenti, L.J.; Serne, R.J.; Krupka, K.M. [Pacific Northwest Lab., Richland, WA (United States); Wood, M.I. [Westinghouse Hanford Company, Richland, WA (United States)

1996-09-01T23:59:59.000Z

239

Real Time Grid Reliability Management 2005  

E-Print Network (OSTI)

a technical assessment of the continuation power flowa technical assessment of the continuation power flowtechnical assessment of algorithms, developed a first prototype incorporating contingency ranking, continuation power

Eto, Joe

2008-01-01T23:59:59.000Z

240

Reliability Technology earns prestigious Los Alamos Award  

NLE Websites -- All DOE Office Websites (Extended Search)

September 2013 Reliability Technology earns prestigious Los Alamos Award Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest...

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Funding Opportunity Announcement: PHYSICS OF RELIABILITY: EVALUATING...  

Office of Environmental Management (EM)

and development projects that will advance the reliability and durability of solar photovoltaic (PV) technologies. Eligible projects will examine the performance of PV modules and...

242

Substation reliability -- Practical application and system approach  

SciTech Connect

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to $3.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)] [Southern California Edison Co., Rosemead, CA (United States)

1995-02-01T23:59:59.000Z

243

Substation reliability -- Practical application and system approach  

SciTech Connect

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to 53.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)

1994-12-31T23:59:59.000Z

244

Information Concerning Reliability Impacts under Various System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant...

245

Sandia National Laboratories: Third Annual Continuous Reliability...  

NLE Websites -- All DOE Office Websites (Extended Search)

analysis of U.S. wind fleet performance based on aggregated fleet reliability data and includes operational statistics, availability time accounting, and top contributors...

246

Reliability Analysis of Electric Power Systems Using an Object-oriented Hybrid Modeling Approach  

E-Print Network (OSTI)

The ongoing evolution of the electric power systems brings about the need to cope with increasingly complex interactions of technical components and relevant actors. In order to integrate a more comprehensive spectrum of different aspects into a probabilistic reliability assessment and to include time-dependent effects, this paper proposes an object-oriented hybrid approach combining agent-based modeling techniques with classical methods such as Monte Carlo simulation. Objects represent both technical components such as generators and transmission lines and non-technical components such as grid operators. The approach allows the calculation of conventional reliability indices and the estimation of blackout frequencies. Furthermore, the influence of the time needed to remove line overloads on the overall system reliability can be assessed. The applicability of the approach is demonstrated by performing simulations on the IEEE Reliability Test System 1996 and on a model of the Swiss high-voltage grid.

Schläpfer, Markus; Kröger, Wolfgang

2012-01-01T23:59:59.000Z

247

Functional reliability analysis of Safety Grade Decay Heat Removal System of Indian 500 MWe PFBR  

Science Journals Connector (OSTI)

Passive systems are increasingly deployed in nuclear industry with an objective of increasing reliability and safety of operations with reduced cost. Methods for assessing the reliability of thermal–hydraulic passive systems, that is systems with moving working fluid, address the issues in natural buoyancy-driven flow that could result in a failure to meet the design safety limits under accident scenarios. This is referred as design functional reliability. This paper presents the results of functional reliability analysis carried out for the passive Safety Grade Decay Heat Removal System (SGDHRS) of Indian Prototype Fast Breeder Reactor (PFBR). The analysis is carried out based on the overall approach reported in the Reliability Methods for Passive System (RMPS, European Commission) project. Functional failure probability is calculated using Monte-Carlo method and also with method of moments.

T. Sajith Mathews; M. Ramakrishnan; U. Parthasarathy; A. John Arul; C. Senthil Kumar

2008-01-01T23:59:59.000Z

248

Reliability estimates for selected sensors in fusion applications  

SciTech Connect

This report presents the results of a study to define several types of sensors in use, the qualitative reliability (failure modes) and quantitative reliability (average failure rates) for these types of process sensors. Temperature, pressure, flow, and level sensors are discussed for water coolant and for cryogenic coolants. The failure rates that have been found are useful for risk assessment and safety analysis. Repair times and calibration intervals are also given when found in the literature. All of these values can also be useful to plant operators and maintenance personnel. Designers may be able to make use of these data when planning systems. The final chapter in this report discusses failure rates for several types of personnel safety sensors, including ionizing radiation monitors, toxic and combustible gas detectors, humidity sensors, and magnetic field sensors. These data could be useful to industrial hygienists and other safety professionals when designing or auditing for personnel safety.

Cadwallader, L.C.

1996-09-01T23:59:59.000Z

249

Power Electronics Reliability Kick Off Meeting Â… Silicon Power Corp. & Sandia Labs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability Reliability Analysis Annual DOE Peer Review Meeting October 8, 2009 Mark A. Smith - Systems Readiness & Sustainment Technologies Department Stan Atcitty - Energy Infrastructure and Distributed Energy Resources Department Sandia National Laboratories Technologies & Customers * Complex Systems Modeling & Simulation * Life Cycle & Total Ownership Costs Analyses * Design for Reliability/Maintainability * Prognostics & Health Management (PHM) * Integrated Logistics Support * Technology Management Optimization * Asset Acquisition & Mission Planning * Risk Assessment & Risk Management Technologies Support Broad Customer Base Automotive Power Electronics Aviation Nuclear Power Coal-Fired Power Petroleum Tools & Technologies Validated Through Broad Use

250

Demand Response and Electric Grid Reliability  

E-Print Network (OSTI)

Demand Response and Electric Grid Reliability Paul Wattles Senior Analyst, Market Design & Development, ERCOT CATEE Conference, Galveston October 10, 2012 2 North American Bulk Power Grids CATEE Conference October 10, 2012 ? The ERCOT... adequacy ? ?Achieving more DR participation would . . . displace some generation investments, but would achieve the same level of reliability... ? ?Achieving this ideal requires widespread demand response and market structures that enable loads...

Wattles, P.

2012-01-01T23:59:59.000Z

251

Data Communication Principles Reliable Data Transfer  

E-Print Network (OSTI)

Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Transmission Fiber vs Copper Wire Weight vs bandwidth Cost Security 11 / 52 #12;Data Communication Principles

Ramkumar, Mahalingam

252

Information Concerning Reliability Impacts under Various System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Concerning Reliability Impacts under Various System Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the unavailability of the Potomac River Generating Station to serve load in the D.C. area. Also enclosed as part of this submittal is material provided by PEPCO (balance of sentence redacted) In addition, there is a discussion concerning the impacts of demand side response in addressing this situation. Information Concerning Reliability Impacts under Various System

253

Reliability First Corporation | OpenEI  

Open Energy Info (EERE)

Reliability First Corporation Reliability First Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 110, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Gateway Reliability First Corporation SERC Reliability Corporation Data application/vnd.ms-excel icon AEO2011:Renewable Energy Generation by Fuel - SERC Reliability Corporation / Gateway- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed

254

Reliability analysis of safety-related digital instrumentation and control in a nuclear power plant.  

E-Print Network (OSTI)

?? There is so far no consensus on how to develop a reliability model of safety-related digitalinstrumentation and control (I&C) in a probabilistic safety assessment… (more)

Gustafsson, Johan

2012-01-01T23:59:59.000Z

255

Reliable and Semi-reliable Communication with Authentication in Mobile Ad Hoc Networks  

E-Print Network (OSTI)

Reliable and Semi-reliable Communication with Authentication in Mobile Ad Hoc Networks Falko of wireless ad hoc sensor networks is the error-proneness and, therefore, the unreliability of communication describe a new approach and an according protocol for usage in ad hoc networks that provides reliable

Breu, Ruth

256

Robot-Powered Reliability Testing at NREL's ESIF  

ScienceCinema (OSTI)

With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested-and currently costly-component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle-all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle's onboard storage tank.

Harrison; Kevin

2014-06-10T23:59:59.000Z

257

Robot-Powered Reliability Testing at NREL's ESIF  

SciTech Connect

With auto manufacturers expected to roll out fuel cell electric vehicles in the 2015 to 2017 timeframe, the need for a reliable hydrogen fueling infrastructure is greater than ever. That's why the National Renewable Energy Laboratory (NREL) is using a robot in its Energy Systems Integration Facility (ESIF) to assess the durability of hydrogen fueling hoses, a largely untested-and currently costly-component of hydrogen fueling stations. The automated machine mimics the repetitive stress of a human bending and twisting the hose to refuel a vehicle-all under the high pressure and low temperature required to deliver hydrogen to a fuel cell vehicle's onboard storage tank.

Harrison; Kevin

2013-12-05T23:59:59.000Z

258

Evaluating an electricity and magnetism assessment tool: Brief electricity and magnetism assessment  

Science Journals Connector (OSTI)

The Brief Electricity and Magnetism Assessment (BEMA), developed by Chabay and Sherwood, was designed to assess student understanding of basic electricity and magnetism concepts covered in college-level calculus-based introductory physics courses. To evaluate the reliability and discriminatory power of this assessment tool, we performed statistical tests focusing both on item analyses (item difficulty index, item discrimination index, and item point biserial coefficient) and on the entire test (test reliability and Ferguson’s delta). The results indicate that BEMA is a reliable assessment tool.

Lin Ding; Ruth Chabay; Bruce Sherwood; Robert Beichner

2006-03-15T23:59:59.000Z

259

Report on the analysis of field data relating to the reliability of solar hot water systems.  

SciTech Connect

Utilities are overseeing the installations of thousand of solar hot water (SHW) systems. Utility planners have begun to ask for quantitative measures of the expected lifetimes of these systems so that they can properly forecast their loads. This report, which augments a 2009 reliability analysis effort by Sandia National Laboratories (SNL), addresses this need. Additional reliability data have been collected, added to the existing database, and analyzed. The results are presented. Additionally, formal reliability theory is described, including the bathtub curve, which is the most common model to characterize the lifetime reliability character of systems, and for predicting failures in the field. Reliability theory is used to assess the SNL reliability database. This assessment shows that the database is heavily weighted with data that describe the reliability of SHW systems early in their lives, during the warranty period. But it contains few measured data to describe the ends of SHW systems lives. End-of-life data are the most critical ones to define sufficiently the reliability of SHW systems in order to answer the questions that the utilities pose. Several ideas are presented for collecting the required data, including photometric analysis of aerial photographs of installed collectors, statistical and neural network analysis of energy bills from solar homes, and the development of simple algorithms to allow conventional SHW controllers to announce system failures and record the details of the event, similar to how aircraft black box recorders perform. Some information is also presented about public expectations for the longevity of a SHW system, information that is useful in developing reliability goals.

Menicucci, David F. (Building Specialists, Inc., Albuquerque, NM)

2011-07-01T23:59:59.000Z

260

SERC Reliability Corporation | OpenEI  

Open Energy Info (EERE)

SERC Reliability Corporation SERC Reliability Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 113, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Carolina EIA Renewable Energy Generation SERC Reliability Corporation Virginia Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Virginia-Carolina- Reference Case (xls, 118.9 KiB) Quality Metrics

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Photovoltaic Module Reliability Workshop 2013 | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and PV Evolutions Impact and Detection of Pyranometer Failure on PV Performance, D.C. Jordan and B. Sekulic of NREL Manufacturing Metrology for c-Si Module ReliabilityDurability,...

262

2014 Transmission Reliability Program Peer Review  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

263

Apply reliability centered maintenance to sealless pumps  

SciTech Connect

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

264

Reliability Challenges for Solar Energy (Presentation)  

SciTech Connect

PV industry can benefit from reliability testing experience of microelectronics industry . Si modules perform well in field; CdTe/CIGS must be sealed to moisture; CPV in product development stage.

Kurtz, S.

2009-04-27T23:59:59.000Z

265

Communication Reliability in Network on Chip Designs  

E-Print Network (OSTI)

duplication with parity (DAP) and triplication error correction (TEC) with Green bus coding for crosstalk avoidances to guard against crosstalk induced errors is presented in [49] and [50] respectively. Ying et al. in [42] present the design of a reliable... duplication with parity (DAP) and triplication error correction (TEC) with Green bus coding for crosstalk avoidances to guard against crosstalk induced errors is presented in [49] and [50] respectively. Ying et al. in [42] present the design of a reliable...

Kumar, Reeshav

2012-10-19T23:59:59.000Z

266

Reliability models of wind farms considering wind speed correlation and WTG outage  

Science Journals Connector (OSTI)

Abstract Wind speed correlation and wind turbine generator (WTG) outage are two factors affecting the reliability model of wind farms, but they are not addressed simultaneously in the existing literature. Meanwhile, WTG outage is reported to be dependent with wind speed to some extent. Therefore, the extended reliability models of wind farms incorporating both of these two factors and the dependency between WTG outage and wind speed are proposed in this paper. To consider the uncertainties and dependencies of wind speed and WTG failure, Copula method is applied to simulate correlated random variables representing for wind speed and the number of failed WTG units. Moreover, the linear apportioning technique is used to create multistate reliability models of wind farms from hourly wind power models. A number of sensitivity analyses on the modified IEEE RTS with wind power are conducted to validate the proposed reliability models for generation adequacy assessment. Case studies show that the generation adequacy indices increase with the correlation of wind speed and WTG forced outage rate (FOR). It is meaningful to point out that the effect of dependency between wind speed and WTG FOR on generation adequacy is minimal when WTG outages are independent, but it will be substantially larger when WTG outages are highly dependent. The proposed multistate reliability models of wind farms provide foundation for the reliability assessment of power systems with wind power integrated.

Fan Chen; Fangxing Li; Zhinong Wei; Guoqiang Sun; Jun Li

2015-01-01T23:59:59.000Z

267

Short-Term Energy Outlook  

Gasoline and Diesel Fuel Update (EIA)

(83/3Q) (83/3Q) Short-Term Energy Outlook iuarterly Projections August 1983 Energy Information Administration Washington, D.C. 20585 t rt jrt- .ort- iort- iort- iort- nort- lort- '.ort- ort- Tt- .-m .erm -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term -Term Term .-Term -Term xrm Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy ^nergy -OJ.UUK Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Outlook Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term Short-Term

268

Assessment of Preferred Depleted Uranium Disposal Forms  

SciTech Connect

The Department of Energy (DOE) is in the process of converting about 700,000 metric tons (MT) of depleted uranium hexafluoride (DUF6) containing 475,000 MT of depleted uranium (DU) to a stable form more suitable for long-term storage or disposal. Potential conversion forms include the tetrafluoride (DUF4), oxide (DUO2 or DU3O8), or metal. If worthwhile beneficial uses cannot be found for the DU product form, it will be sent to an appropriate site for disposal. The DU products are considered to be low-level waste (LLW) under both DOE orders and Nuclear Regulatory Commission (NRC) regulations. The objective of this study was to assess the acceptability of the potential DU conversion products at potential LLW disposal sites to provide a basis for DOE decisions on the preferred DU product form and a path forward that will ensure reliable and efficient disposal.

Croff, A.G.; Hightower, J.R.; Lee, D.W.; Michaels, G.E.; Ranek, N.L.; Trabalka, J.R.

2000-06-01T23:59:59.000Z

269

Reliability-Based Prioritizing Maintenance Policy for Distribution System  

Science Journals Connector (OSTI)

This paper presents an approach to prioritize maintenance tasks in power distribution system based on reliability models. This approach define weighted average system reliability index WASRI employing reliability indices SAIFI, SAIDI, MAIFI and interruption ... Keywords: Maintenance management, distribution reliability, reliability indices

Zhang Yong; Sun Xiaorong; Chen Hao; Fangxing Li

2010-06-01T23:59:59.000Z

270

Final Site-Wide Environmental Assessment of National Renewable Energy Laboratory's National Wind Technology Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 31, 2002 May 31, 2002 DOE/EA 1378 FINDING OF NO SIGNIFICAflJT IMPACT For the NATIONAL WIND TECHNOLOGY CENTER Site Operations and Short-Term and Long-Term Improvement Programs Golden, Colorado AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: The Department of Energy (DOE) conducted a Site-Wide Environmental Assessment (EA) of the National Wind Technology Center (NWTC) to evaluate potential impacts of site operations and short-term and long-term improvement programs. DOE's Office of Energy Efficiency and Renewable Energy (EERE) leads the national research effort to develop clean, competitive, and reliable renewable energy and power delivery technologies for the 21st century. The mission of EERE's Wind Energy Program is to help the

271

Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources  

NLE Websites -- All DOE Office Websites (Extended Search)

Understanding Bulk Power Reliability: Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources Emily Fisher Lawrence Berkeley National Laboratory esfisher@lbl.gov Joseph H. Eto Lawrence Berkeley National Laboratory jheto@lbl.gov Kristina Hamachi LaCommare Lawrence Berkeley National Laboratory kshamachi@lbl.gov Abstract Bulk power system reliability is of critical importance to the electricity sector. Complete and accurate information on events affecting the bulk power system is essential for assessing trends and efforts to maintain or improve reliability. Yet, current sources of this information were not designed with these uses in mind. They were designed, instead, to support real-time emergency notification to industry and government first-responders. This

272

Measuring Short-term Air Conditioner Demand Reductions for Operations and  

NLE Websites -- All DOE Office Websites (Extended Search)

Measuring Short-term Air Conditioner Demand Reductions for Operations and Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement Title Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement Publication Type Report LBNL Report Number LBNL-5330E Year of Publication 2012 Authors Bode, Josh, Michael J. Sullivan, and Joseph H. Eto Pagination 120 Date Published 01/2012 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), electricity markets and policy group, energy analysis and environmental impacts department Abstract Several recent demonstrations and pilots have shown that air conditioner (AC) electric loads can be controlled during the summer cooling season to provide ancillary services and improve the stability and reliability of the electricity grid. A key issue for integration of air conditioner load control into grid operations is how to accurately measure shorter-term (e.g., ten's of minutes to a couple of hours) demand reductions from AC load curtailments for operations and settlement. This report presents a framework for assessing the accuracy of shorter-term AC load control demand reduction measurements. It also compares the accuracy of various alternatives for measuring AC reductions - including methods that rely on regression analysis, load matching and control groups - using feeder data, household data and AC end-use data. A practical approach is recommended for settlement that relies on set of tables, updated annually, with pre-calculated load reduction estimates. The tables allow users to look up the demand reduction per device based on the daily maximum temperature, geographic region and hour of day and simplify the settlement process.

273

Reliability of EUCLIDIAN: An autonomous robotic system for image-guided prostate brachytherapy  

SciTech Connect

Purpose: Recently, several robotic systems have been developed to perform accurate and consistent image-guided brachytherapy. Before introducing a new device into clinical operations, it is important to assess the reliability and mean time before failure (MTBF) of the system. In this article, the authors present the preclinical evaluation and analysis of the reliability and MTBF of an autonomous robotic system, which is developed for prostate seed implantation. Methods: The authors have considered three steps that are important in reliability growth analysis. These steps are: Identification and isolation of failures, classification of failures, and trend analysis. For any one-of-a-kind product, the reliability enhancement is accomplished through test-fix-test. The authors have used failure mode and effect analysis for collection and analysis of reliability data by identifying and categorizing the failure modes. Failures were classified according to severity. Failures that occurred during the operation of this robotic system were considered as nonhomogenous Poisson process. The failure occurrence trend was analyzed using Laplace test. For analyzing and predicting reliability growth, commonly used and widely accepted models, Duane's model and the Army Material Systems Analysis Activity, i.e., Crow's model, were applied. The MTBF was used as an important measure for assessing the system's reliability. Results: During preclinical testing, 3196 seeds (in 53 test cases) were deposited autonomously by the robot and 14 critical failures were encountered. The majority of the failures occurred during the first few cases. The distribution of failures followed Duane's postulation as well as Crow's postulation of reliability growth. The Laplace test index was -3.82 (<0), indicating a significant trend in failure data, and the failure intervals lengthened gradually. The continuous increase in the failure occurrence interval suggested a trend toward improved reliability. The MTBF was 592 seeds, which implied that several prostate seed implantation cases would be possible without encountering any critical failure. The shape parameter for the MTBF was 0.3859 (<1), suggesting a positive reliability growth of this robotic system. At 95% confidence, the reliability for deposition of 65 seeds was more than 90%. Conclusions: Analyses of failure mode strongly indicated a gradual improvement of reliability of this autonomous robotic system. High MTBF implied that several prostate seed implant cases would be possible without encountering any critical failure.

Podder, Tarun K.; Buzurovic, Ivan; Huang Ke; Showalter, Timothy; Dicker, Adam P.; Yu, Yan [Department of Radiation Oncology, Kimmel Cancer Center (NCI-designated), Thomas Jefferson University, Philadelphia, Pennsylvania 19107 (United States)

2011-01-15T23:59:59.000Z

274

Measuring eating disorder attitudes and behaviors: a reliability generalization study  

E-Print Network (OSTI)

I used reliability generalization procedures to determine the mean score reliability of the Eating Disorder Inventory (EDI), the Eating Attitudes Test (EAT), and the Bulimia Test (BULIT). Reliability generalization is a type of meta-analysis used...

Pearson, Crystal Anne

2009-05-15T23:59:59.000Z

275

Reliable Deployment of Component-based Applications into Distributed Environments  

E-Print Network (OSTI)

Reliable Deployment of Component-based Applications into Distributed Environments Abbas Heydarnoori's quality of service properties such as reliability. In distributed sys- tems, the reliability that should be deployed into a large distributed en- vironment, several deployment configurations are typ

Czarnecki, Krzysztof

276

Considering Risk-Taking Behavior in Travel Time Reliability  

E-Print Network (OSTI)

wide distribution of preferences for speed and reliability.Distribution of Motorists’ Preference for Travel Time and Reliability:time, reliability and cost have normal distributions, i.e. ,

2005-01-01T23:59:59.000Z

277

Integration of NDE Reliability and Fracture Mechanics  

SciTech Connect

The Pacific Northwest Laboratory is conducting a four-phase program for measuring and evaluating the effectiveness and reliability of in-service inspection (lSI} performed on the primary system piping welds of commercial light water reactors (LWRs). Phase I of the program is complete. A survey was made of the state of practice for ultrasonic rsr of LWR primary system piping welds. Fracture mechanics calculations were made to establish required nondestrutive testing sensitivities. In general, it was found that fatigue flaws less than 25% of wall thickness would not grow to failure within an inspection interval of 10 years. However, in some cases failure could occur considerably faster. Statistical methods for predicting and measuring the effectiveness and reliability of lSI were developed and will be applied in the "Round Robin Inspections" of Phase II. Methods were also developed for the production of flaws typical of those found in service. Samples fabricated by these methods wilI be used in Phase II to test inspection effectiveness and reliability. Measurements were made of the influence of flaw characteristics {i.e., roughness, tightness, and orientation) on inspection reliability. These measurernents, as well as the predictions of a statistical model for inspection reliability, indicate that current reporting and recording sensitivities are inadequate.

Becker, F. L.; Doctor, S. R.; Heas!er, P. G.; Morris, C. J.; Pitman, S. G.; Selby, G. P.; Simonen, F. A.

1981-03-01T23:59:59.000Z

278

Now Available: Smart Grid Investments Improve Grid Reliability...  

Energy Savers (EERE)

Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Now Available: Smart Grid Investments Improve Grid Reliability, Resilience, and...

279

Agenda for the PV Module Reliability Workshop, February 26 -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agenda for the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado Agenda for the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado This...

280

2013 Reliability & Markets Peer Review - Day 2 Presentations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review - The Nexus of System Reliability, Energy Costs, and the Environment During High Energy Demand Days - Max Zhang, Cornell More Documents & Publications 2012 Reliability &...

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Reliability Evaluation of Substations Subject to Protection Failures:.  

E-Print Network (OSTI)

??Reliability evaluation of power system substations is of significant importance when performing asset management. Most of the studies about substation reliability only focus on the… (more)

Wang, F.

2012-01-01T23:59:59.000Z

282

Thermal Stress and Reliability for Advanced Power Electronics...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Performance and Reliability of Bonded Interfaces Physics of Failure of Electrical Interconnects Thermal Stress and Reliability for Advanced Power Electronics and Electric Machines...

283

Guide to Using Combined Heat and Power for Enhancing Reliability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Guide to Using Combined Heat and Power for Enhancing Reliability and Resiliency in Buildings Guide to Using Combined Heat and Power for Enhancing Reliability and Resiliency in...

284

Combined Heat and Power System Enables 100% Reliability at Leading...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Combined Heat and Power System Enables 100% Reliability at Leading Medical Campus - Case Study, 2013 Thermal...

285

Methods of estimating the reliability of nuclear reactor installations  

Science Journals Connector (OSTI)

Domestic and foreign experience indicate that quantitative analysis of the reliability of reactor systems during their development is a rather effective means of increasing their reliability.

I. Ya. Emel'yanov; A. I. Klemin; E. F. Polyakov

1974-11-01T23:59:59.000Z

286

Office of Electricity Delivery and Energy Reliability Recovery...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Delivery and Energy Reliability Recovery Program Plan Office of Electricity Delivery and Energy Reliability Recovery Program Plan Microsoft Word - OE PSRP June 5 2009...

287

The Office of Electricity Delivery and Energy Reliability is...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Office of Electricity Delivery and Energy Reliability is Closely Monitoring Hurricane Irene (2011) The Office of Electricity Delivery and Energy Reliability is Closely...

288

Office of Electricity Delivery & Energy Reliability FY 2012 Budget...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation...

289

Office of Electricity Delivery and Energy Reliability Cyber Security...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections On...

290

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

291

Mechanical Reliability of Piezo-Stack Actuators | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mechanical Reliability of Piezo-Stack Actuators Mechanical Reliability of Piezo-Stack Actuators Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review...

292

Electro-thermal-mechanical Simulation and Reliability for Plug...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle...

293

The Business Case for Fuel Cells 2013: Reliability, Resiliency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Reliability, Resiliency & Savings The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings This report, compiled by Fuel Cells 2000 with support from the Fuel...

294

Reliability of islanded microgrids with stochastic generation and prioritized load  

E-Print Network (OSTI)

The potential to improve distribution system reliability is a primary motivation behind the development and deployment of microgrids. Previous studies have illustrated substantial reliability benefits of dispatchable ...

Marden, Mirjana Milosevic

295

Travel Time Reliability: Its Measurement and Prediction | ornl...  

NLE Websites -- All DOE Office Websites (Extended Search)

reliability can help agencies understand the performance of their systems and monitor how reliability improves over time. It equips them to answer questions like: What is the...

296

High Reliability, High TemperatureThermoelectric Power Generation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reliability, High TemperatureThermoelectric Power Generation Materials and Technologies High Reliability, High TemperatureThermoelectric Power Generation Materials and Technologies...

297

Smart Grid: Creating Jobs while Delivering Reliable,  

Open Energy Info (EERE)

Smart Grid: Creating Jobs while Delivering Reliable, Smart Grid: Creating Jobs while Delivering Reliable, Environmentally-friendly Energy Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(1992) Super contributor 2 March, 2010 - 14:14 imported OpenEI On April 16th, 2009, Vice President Joe Biden announced that the Department of Energy was planning to develop a stronger, more reliable energy grid. The plan would allocate $3.4 billion in funds to be distributed across the nation, aiding projects aimed at improving and updating the current electrical power grid in the United States. Two projects are funded by smart grid: smaller and larger. Smaller projects range from $300,000 to $20,000,000. These projects typically focus on upgrading equipment in less populated ares. Larger projects range from

298

Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION The Office of Electricity Delivery and Energy Reliability (OE) leads national efforts to modernize the electric grid, enhance security and reliability of energy infrastructure, and facilitate recovery from disruptions to the energy supply. As stated in the President's A Policy Framework for the 21 st Century Grid, a smarter, modernized electric grid is fundamental to transforming the Nation's energy system and securing US leadership in a clean energy future. OE supports activities that enable innovation across the energy sector, empower American consumers, and secure our energy future. OE consists of three programs: Research and Development; Permitting, Siting and Analysis; and Infrastructure Security and Energy Restoration.

299

We present two systems, reliable sockets (rocks) and reliable packets (racks), that provide transparent network connection  

E-Print Network (OSTI)

Abstract We present two systems, reliable sockets (rocks) and reliable packets (racks of the connection changes IP address, with correct recovery of in-flight data. To allow rocks and racks Protocol that enables the remote detection of rocks and racks, or any other socket enhancement system

Miller, Barton P.

300

Technique for Measuring Hybrid Electronic Component Reliability  

SciTech Connect

Materials compatibility studies of aged, engineered materials and hardware are critical to understanding and predicting component reliability, particularly for systems with extended stockpile life requirements. Nondestructive testing capabilities for component reliability would significantly enhance lifetime predictions. For example, if the detection of crack propagation through a solder joint can be demonstrated, this technique could be used to develop baseline information to statistically determine solder joint lifelengths. This report will investigate high frequency signal response techniques for nondestructively evaluating the electrical behavior of thick film hybrid transmission lines.

Green, C.C.; Hernandez, C.L.; Hosking, F.M.; Robinson, D.; Rutherford, B.; Uribe, F.

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

CHEMICAL ENGINEERING Fall Term Spring Term  

E-Print Network (OSTI)

to Engineering (FYE) 2 CHEM 112 General Chemistry 3 CHEM 111 General Chemistry 3 CHEG 112 Introduction I 3 CHEG 345 Chemical Engineering Laboratory I 3 CHEM 333 Organic Chemistry Laboratory 1 CHEM 332CHEMICAL ENGINEERING CURRICULUM FALL 2010 Fall Term Spring Term EGGG 101 Introduction

Lee, Kelvin H.

302

CHEMICAL ENGINEERING Fall Term Spring Term  

E-Print Network (OSTI)

CHEG 332 Chemical Engineering Kinetics 3 CHEG 342 Heat and Mass Transfer 3 CHEG 341 Fluid Mechanics 3CHEMICAL ENGINEERING CURRICULUM Fall Term Spring Term EGGG 101 Introduction to Engineering (FYE) 2 CHEG 112 Introduction to Chemical Engineering 3 CHEM 111 General Chemistry 3 CHEM 112 General Chemistry

Lee, Kelvin H.

303

Granite Reliable Power | Open Energy Information  

Open Energy Info (EERE)

Reliable Power Reliable Power Jump to: navigation, search Name Granite Reliable Power Facility Granite Reliable Power Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Brookfield Renewable Energy Group Developer Brookfield Renewable Energy Group Energy Purchaser Green Mountain Power / Central Vermont Public Service / New England Power Pool Location Milan NH Coordinates 44.74039314°, -71.28376007° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.74039314,"lon":-71.28376007,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

304

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network (OSTI)

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

305

Reliability Meets Big Data: Opportunities and Challenges  

E-Print Network (OSTI)

be outfitted with sensors that can be used to capture information about how and when and under what #12;1 The Next Generation of Reliability Data 1.1 Background Due to changes in technology, the next sensors and smart chips in a product to measure variables such as use rate, system load, and various

306

REPUTATION AND RELIABILITY IN COLLECTIVE GOODS  

E-Print Network (OSTI)

REPUTATION AND RELIABILITY IN COLLECTIVE GOODS THE CASE OF THE ONLINE ENCYCLOPEDIA WIKIPEDIA Denise into essentially public goods. Similar to other public goods, incentives for reputation and group identity appear such goods. In this paper we examine how contributor motivations affect the type of contributions made

Smith, Sean W.

307

Reliability centered maintenance for substation equipment  

SciTech Connect

This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

NONE

1996-08-01T23:59:59.000Z

308

Grid Reliability- An Electric Utility Company's Perspective  

Energy.gov (U.S. Department of Energy (DOE))

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers Southern Company's business continuity, North American Electric Reliability Corporation (NERC) cybersecurity, and homeland security as well as physical recovery after a major outage, and five questions to ask your local utility.

309

Relatedness influences signal reliability in evolving robots  

E-Print Network (OSTI)

minute in an arena containing a food and a poison source that both emitted red light (figure 1). Robots could distinguish food and poison only at a very close range. The performance of robots was proportional related robots produced signals that reliably indicated the location of the food source and thereby

Floreano, Dario

310

Performance and reliability of Multistage Bus Network  

E-Print Network (OSTI)

are then introduced. Fault tolerance and reliability of an MBN are evaluated using redundancy graphs. It is revealed that MBN in loosely coupled system can totally retain its connection capability in the presence of fault in any single component (i.e. switch, link...

Askar, Tahsin

2012-06-07T23:59:59.000Z

311

Northeast United States U.S. Department of Energy Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment of the Adequacy of Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Energy Infrastructure Modeling and Analysis Division November 2013 Northeast U.S. Natural Gas Pipeline Adequacy Assessment, 2013 2 Preface In 2005-06, the U.S. DOE Office of Electricity Delivery and Energy Reliability (OE) conducted a study on the adequacy of interstate natural gas pipeline capacity serving the northeastern United States to meet natural gas demand in the event of a pipeline disruption. The study modeled gas demand for select market areas in the Northeast under a range of different weather conditions. The study then determined how interstate pipeline flow patterns could

312

How to Estimate the Value of Service Reliability Improvements  

E-Print Network (OSTI)

smart grid investment is proposed, reliability improvement is one of the most frequently cited benefits.

Sullivan, Michael J.

2010-01-01T23:59:59.000Z

313

Improving Work Flow Reliability Proceedings IGLC-7 275  

E-Print Network (OSTI)

Ballard1 ABSTRACT Improving work flow reliability is important for the productivity of linked productionImproving Work Flow Reliability Proceedings IGLC-7 275 IMPROVING WORK FLOW RELIABILITY Glenn units, and consequently for project cost and duration. One measure of work flow reliability is PPC

Tommelein, Iris D.

314

ORNL/TM-2004/91 MEASUREMENT PRACTICES FOR RELIABILITY  

E-Print Network (OSTI)

;#12;1. Introduction and Discussion of the Measurement "Toolkit" This report provides a distribution reliabilityORNL/TM-2004/91 MEASUREMENT PRACTICES FOR RELIABILITY AND POWER QUALITY A TOOLKIT OF RELIABILITY MEASUREMENT PRACTICES June 2004 #12;#12;ORNL/TM-2004/91 MEASUREMENT PRACTICES FOR RELIABILITY AND POWER

Oak Ridge National Laboratory

315

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and others. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More Documents & Publications North American Electric Reliability Council Power Outage Update North American Electric Reliability Council Outage Announcement U.S. - Canada Power System Outage Task Force: Final Report on the

316

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

317

Current Human Reliability Analysis Methods Applied to Computerized Procedures  

SciTech Connect

Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no US nuclear power plant has implemented CPs in its main control room (Fink et al., 2009). Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of enhanced ease of use and easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

Ronald L. Boring

2012-06-01T23:59:59.000Z

318

A human reliability analysis of a nuclear explosives dismantlement  

SciTech Connect

This paper describes the methodology used in a human reliability analysis (HRA) conducted during a quantitative hazard assessment of a nuclear weapon disassembly process performed at the Pantex plant. The probability of human errors during the disassembly process is an extremely important aspect of estimating accident-sequence frequency for nuclear weapons processing. The methods include the systematic identification of potential human-initiated or enabled accident sequences using an accident-sequence fault tree, the extensive use of walkthroughs and videotaping of the disassembly process, and hands-on testing of postulated human errors. THERP modeling of rule-based behavior and operational data analysis of errors in skill-based behavior are described. A simple method for evaluating the approximate likelihood of nonmalevolent violations of procedures was developed and used to examine the process. The HRA occurred concurrently with process design, so considerable interaction between the analysts and designers occurred and resulted in design changes that are discussed in the paper.

Bott, T.F.

1995-07-01T23:59:59.000Z

319

Wind turbine reliability : understanding and minimizing wind turbine operation and maintenance costs.  

SciTech Connect

Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. Cost of energy (COE) is a key project evaluation metric, both in commercial applications and in the U.S. federal wind energy program. To reflect this commercial reality, the wind energy research community has adopted COE as a decision-making and technology evaluation metric. The COE metric accounts for the effects of reliability through levelized replacement cost and unscheduled maintenance cost parameters. However, unlike the other cost contributors, such as initial capital investment and scheduled maintenance and operating expenses, costs associated with component failures are necessarily speculative. They are based on assumptions about the reliability of components that in many cases have not been operated for a complete life cycle. Due to the logistical and practical difficulty of replacing major components in a wind turbine, unanticipated failures (especially serial failures) can have a large impact on the economics of a project. The uncertainty associated with long-term component reliability has direct bearing on the confidence level associated with COE projections. In addition, wind turbine technology is evolving. New materials and designs are being incorporated in contemporary wind turbines with the ultimate goal of reducing weight, controlling loads, and improving energy capture. While the goal of these innovations is reduction in the COE, there is a potential impact on reliability whenever new technologies are introduced. While some of these innovations may ultimately improve reliability, in the short term, the technology risks and the perception of risk will increase. The COE metric used by researchers to evaluate technologies does not address this issue. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce COE.

Not Available

2004-11-01T23:59:59.000Z

320

Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subtopic c. References: Subtopic c. References: 1. Thomas B. Johansson, Henry Kelly, Amulya K.N. Reddy, and Robert H. Williams, "Renewable Energy: Sources for Fuels and Electricity", Island Press, 1993 2. Patrick Takahashi and Andrew Trenka, "Ocean Thermal Energy Conversion", John Wiley & sons, 1996. *All references can be accessed at: http://archive.epri.com/oceanenergy/streamenergy.html#reports OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY 28. NATURAL DISASTER REDUCTION THROUGH TECHNOLOGY The U.S. electric power sector is a critical part of our society. Virtually all aspects of residential, industrial, and commercial activities depend on safe, reliable, and affordable electricity. Electricity is among the most infrastructure-intensive segments of the energy sector - the electricity grid includes a network of 5,000 power

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

North American Electric Reliability Council Outage Announcement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Council Outage Announcement Council Outage Announcement North American Electric Reliability Council Outage Announcement Starting at about 4:11 p.m. EDT, major losses of electric load occurred in the northeastern United States and Canada in the Eastern Interconnection. Although the exact cause is not known at present, the outages are not the result of a terrorist attack. The areas most affected center around the Great Lakes: Michigan, Ohio, New York City, Ontario, Quebec, northern New Jersey, Massachusetts, and Connecticut. North American Electric Reliability Council Outage Announcement More Documents & Publications Blackout 2003: Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations Blackout 2003: Blackout Final Implementation Report

322

Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Cisco Systems to Comments of Cisco Systems to Office of Electricity Delivery and Energy Reliability Department of Energy in Response to Request for Information: Addressing Policy and Logistical Challenges to Smart Grid Implementation Issued September 13, 2010 FR Doc. 2010-23251 November 30, 2010 Cisco Systems provides these Comments in response to the Request for Information ("RFI") issued by the Office of Electricity Delivery and Energy Reliability of the Department of Energy ("DOE") on September 13, 2010. The RFI seeks information across a broad range of topics, but also requests that commenters be "concise," and provide "facts and concrete recommendations that can augment the general knowledge." 1 1. Interoperability Standards and the Smart Grid

323

Sample sizes for confidence limits for reliability.  

SciTech Connect

We recently performed an evaluation of the implications of a reduced stockpile of nuclear weapons for surveillance to support estimates of reliability. We found that one technique developed at Sandia National Laboratories (SNL) under-estimates the required sample size for systems-level testing. For a large population the discrepancy is not important, but for a small population it is important. We found that another technique used by SNL provides the correct required sample size. For systems-level testing of nuclear weapons, samples are selected without replacement, and the hypergeometric probability distribution applies. Both of the SNL techniques focus on samples without defects from sampling without replacement. We generalized the second SNL technique to cases with defects in the sample. We created a computer program in Mathematica to automate the calculation of confidence for reliability. We also evaluated sampling with replacement where the binomial probability distribution applies.

Darby, John L.

2010-02-01T23:59:59.000Z

324

Reliability Analysis of Brittle, Thin Walled Structures  

SciTech Connect

One emerging application for ceramics is diesel particulate filters being used order to meet EPA regulations going into effect in 2008. Diesel particulates are known to be carcinogenic and thus need to be minimized. Current systems use filters made from ceramics such as mullite and corderite. The filters are brittle and must operate at very high temperatures during a burn out cycle used to remove the soot buildup. Thus the filters are subjected to thermal shock stresses and life time reliability analysis is required. NASA GRC has developed reliability based design methods and test methods for such applications, such as CARES/Life and American Society for Testing and Materials (ASTM) C1499 “Standard Test Method for Equibiaxial Strength of Ceramics.”

Jonathan A Salem and Lynn Powers

2007-02-09T23:59:59.000Z

325

Bridging Resilience Engineering and Human Reliability Analysis  

SciTech Connect

There has been strong interest in the new and emerging field called resilience engineering. This field has been quick to align itself with many existing safety disciplines, but it has also distanced itself from the field of human reliability analysis. To date, the discussion has been somewhat one-sided, with much discussion about the new insights afforded by resilience engineering. This paper presents an attempt to address resilience engineering from the perspective of human reliability analysis (HRA). It is argued that HRA shares much in common with resilience engineering and that, in fact, it can help strengthen nascent ideas in resilience engineering. This paper seeks to clarify and ultimately refute the arguments that have served to divide HRA and resilience engineering.

Ronald L. Boring

2010-06-01T23:59:59.000Z

326

Target structural reliability in life cycle consideration  

Science Journals Connector (OSTI)

The concept of minimising life cycle cost can be rationally applied to determine a target reliability of structures. However, there has been a recent legal requirement to reduce CO2 emissions, therefore, the minimisation of life cycle CO2 emission could be an alternative approach in structural design. This paper explains the general formulae for deciding the optimum reliability by minimising the total life cycle cost and the amount of CO2 emission in the structure's lifetime, and also shows that these formulae can be applied to decision making for the cost-benefit problem related to seismic strengthening of structures. Additionally, the role of the engineer is discussed, reflecting the current situation in Japan.

Jun Kanda; Tsuyoshi Takada; Hang Choi

2007-01-01T23:59:59.000Z

327

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! ☺ ☺ ☺ ☺ ☺ ☺

328

Reliability based inspection scheduling of floaters  

SciTech Connect

This paper presents the development and application of reliability based inspection planning techniques for floaters. Based on previous experience from jacket structure applications optimized inspection planning (OIP) techniques for floaters are developed. The differences between floaters and jacket structures in relation to fatigue damage, redundancy levels and inspection practice are examined and reflected in the proposed methodology. The application and benefits of these techniques is demonstrated through representative analyses and important trends are highlighted through the results of a parametric sensitivity study.

Onoufriou, T.; Simpson, R.J.; Protopapas, M.

1995-12-31T23:59:59.000Z

329

Structural reliability of offshore wind turbines.  

E-Print Network (OSTI)

??Statistical extrapolation is required to predict extreme loads, associated with a target return period, for offshore wind turbines. In statistical extrapolation, “short-term" distributions of the… (more)

Agarwal, Puneet, 1977-

2012-01-01T23:59:59.000Z

330

CRAD, Configuration Management Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

331

Washington DC Reliability Requirements and the Need to Operate Mirant's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington DC Reliability Requirements and the Need to Operate Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Pursuant to Docket No. EO-05-01: Oak Ridge National Laboratory provided an analysis of the Mirant Potomac River Generation Station in 2005 and discussed the reliability requirements of the local area and the potential impacts on reliability of changing operation of the Potomac River Generating Station in this paper. Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability.pdf

332

An Examination of Temporal Trends in Electricity Reliability Based on Reports from U.S. Electric Utilities  

SciTech Connect

Since the 1960s, the U.S. electric power system has experienced a major blackout about once every 10 years. Each has been a vivid reminder of the importance society places on the continuous availability of electricity and has led to calls for changes to enhance reliability. At the root of these calls are judgments about what reliability is worth and how much should be paid to ensure it. In principle, comprehensive information on the actual reliability of the electric power system and on how proposed changes would affect reliability ought to help inform these judgments. Yet, comprehensive, national-scale information on the reliability of the U.S. electric power system is lacking. This report helps to address this information gap by assessing trends in U.S. electricity reliability based on information reported by electric utilities on power interruptions experienced by their customers. Our research augments prior investigations, which focused only on power interruptions originating in the bulk power system, by considering interruptions originating both from the bulk power system and from within local distribution systems. Our research also accounts for differences among utility reliability reporting practices by employing statistical techniques that remove the influence of these differences on the trends that we identify. The research analyzes up to 10 years of electricity reliability information collected from 155 U.S. electric utilities, which together account for roughly 50% of total U.S. electricity sales. The questions analyzed include: 1. Are there trends in reported electricity reliability over time? 2. How are trends in reported electricity reliability affected by the installation or upgrade of an automated outage management system? 3. How are trends in reported electricity reliability affected by the use of IEEE Standard 1366-2003?

Eto, Joseph H.; LaCommare, Kristina Hamachi; Larsen, Peter; Todd, Annika; Fisher, Emily

2012-01-06T23:59:59.000Z

333

Physics-Based Stress Corrosion Cracking Component Reliability Model cast in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Physics-Based Stress Corrosion Cracking Component Reliability Model Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). The methodology emerging from the RISMC pathway is not a conventional probabilistic risk assessment (PRA)-based one; rather, it relies on a reactor systems simulation framework in which

334

Physics-Based Stress Corrosion Cracking Component Reliability Model cast in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Physics-Based Stress Corrosion Cracking Component Reliability Model Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). The methodology emerging from the RISMC pathway is not a conventional probabilistic risk assessment (PRA)-based one; rather, it relies on a reactor systems simulation framework in which

335

College of Electricity Delivery and Energy Reliability | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Delivery and Energy Reliability Electricity Delivery and Energy Reliability College of Electricity Delivery and Energy Reliability College of Electricity Delivery and Energy Reliability Vision OE recognizes that our Nation's sustained economic prosperity, quality of life, and global competitiveness depend on access to an abundance of secure, reliable, and affordable energy resources. Through a mix of technology and policy solutions, we will address the changing dynamics and uncertainties in which the electric system will operate. We will leverage effective partnerships, solid research, and best practices to address diverse interests in achieving economic, societal, and environmental objectives. Resources Explore the following topics at OE's College of Electricity Delivery and Energy Reliability:

336

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and others. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More Documents & Publications North American Electric Reliability Council Power Outage Update Blackout 2003: Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations

337

Global Nuclear Energy Partnership Fact Sheet - Establish Reliable Fuel  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Global Nuclear Energy Partnership Fact Sheet - Establish Reliable Global Nuclear Energy Partnership Fact Sheet - Establish Reliable Fuel Services Global Nuclear Energy Partnership Fact Sheet - Establish Reliable Fuel Services GNEP would build and strengthen a reliable international fuel services consortium under which "fuel supplier nations" would choose to operate both nuclear power plants and fuel production and handling facilities, providing reliable fuel services to "user nations" that choose to only operate nuclear power plants. This international consortium is a critical component of the GNEP initiative to build an improved, more proliferation-resistant nuclear fuel cycle that recycles used fuel, while Global Nuclear Energy Partnership Fact Sheet - Establish Reliable Fuel Services More Documents & Publications

338

Prediction of long-term creep behavior of epoxy adhesives for structural applications  

E-Print Network (OSTI)

that reliable accelerated tests be developed to determine their long-term performances under different exposed environments. A neat epoxy resin system and a commercial structural adhesive system for bonding aluminum substrates are investigated. A series...

Feng, Chih-Wei

2005-11-01T23:59:59.000Z

339

E-Print Network 3.0 - assessment chief joseph Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Objective assessment Source: Collection: Engineering 84 *indicates change 1 BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT Summary: for Reliable Energy co Adams...

340

New evaluation of the {pi}N{sigma} term  

SciTech Connect

A new evaluation of the {pi}N{sigma} term is presented that incorporates recent s-channel phase shifts and t-channel {pi}{pi} phase shifts. We also introduce analyticity-based extrapolation techniques that, along with standard dispersion relation methods, produce a more reliable extrapolation to the Cheng-Dashen point. A recent George Washington University (GWU) phase-shift analysis leads to a {sigma} term of 81{+-}6 MeV.

Hite, Gerald E. [Texas A and M University at Galveston, Galveston, Texas 77553-1675 (United States); Kaufmann, William B.; Jacob, Richard J. [Arizona State University, Tempe, Arizona 85287-1504 (United States)

2005-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Understanding Bulk Power Reliability: The Importance of Good Data and A Critical Review of Existing Sources  

E-Print Network (OSTI)

for Electric Power Distribution Reliability Indices. ISBN 0-to report distribution system reliability for each dataset

Fisher, Emily

2012-01-01T23:59:59.000Z

342

The Application of Reliability-Based Design Factors In Stress Corrosion Cracking Evaluations  

SciTech Connect

First-order reliability methodology (FORM) is used to develop reliability-based design factors for deterministic analyses of stress corrosion cracking. The basic elements of FORM as applied to structural reliability problems are reviewed and then employed specifically to stress corrosion cracking evaluations. Failure due to stress corrosion cracking is defined as crack initiation followed by crack growth to a critical depth. The stress corrosion cracking process is thus represented in terms of a crack initiation time model and a crack growth rate model, with the crack growth rate integrated from the initiation time to the time at which the crack grows to its critical depth. Both models are described by log-normal statistical distribution functions. A procedure is developed to evaluate design factors that are applied to the mean values of the crack initiation time and the crack growth rate for specified temperature and stress conditions. The design factors, which depend on the standard deviations of the statistical distributions, are related to a target reliability, which is inversely related to an acceptable probability of failure. The design factors are not fixed, but are evaluated on a case-to-case basis for each application. The use of these design factors in a deterministic analysis assures that the target reliability will be attained and the corresponding acceptable probability of failure will not be exceeded. An example problem illustrates use of this procedure.

E. Friedman

2001-12-20T23:59:59.000Z

343

Availability and Reliability Issues for ILC  

SciTech Connect

The International Linear Collider (ILC) will be the largest most complicated accelerator ever built. For this reason extensive work is being done early in the design phase to ensure that it will be reliable enough. This includes gathering failure mode data from existing accelerators and simulating the failures and repair times of the ILC. This simulation has been written in a general fashion using MATLAB and could be used for other accelerators. Results from the simulation tool have been used in making some of the major ILC design decisions and an unavailability budget has been developed.

Himel, T.; Nelson, J.; Phinney, N.; /SLAC; Ross, M.; /Fermilab

2007-06-27T23:59:59.000Z

344

Using Fragmentation To Increase Reliability For Workflow Systems  

Science Journals Connector (OSTI)

In a large organization, at any moment there may exist a large number of process instances. If a failure occurs a considerable number of them may be affected. Thus enhancing reliability is an important issue in workflow applications. Traditionally, reliability ...

J. Tang; J. Veijalainen

1999-04-01T23:59:59.000Z

345

2014 Reliability & Markets Peer Review- Day 1 Presentations  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 5 - 6, 2014. Presentations from Day 1 (Sessions I through IV) are available here.

346

Implications of reliability in mechanistic/empirical pavement design applications  

E-Print Network (OSTI)

to engineering is that; reliability is the probability that an engineered system will perform its required function adequately for a specified period of time under the stated conditions. Reliability is important because of the uncertainty involved...

Killingsworth, Brian Mark

1994-01-01T23:59:59.000Z

347

The effect of Relay Protection on the Substation Reliability  

Science Journals Connector (OSTI)

This paper presents a model for evaluating the reliability of the substation actions after transmission grid faults. The model ... of different line protection systems by using the substation reliability model is...

Liisa Pottonen; Urho Pulkkinen…

2004-01-01T23:59:59.000Z

348

Reliability in Automotive Engineering by Fuzzy Rule-Based FMEA  

Science Journals Connector (OSTI)

The Failure Modes and Effects Analysis (FMEA) is a reliability estimation method intended to ... used to distinguish these methods. The fuzzy FMEA is a quantitative method of reliability or...

László Pokorádi; Tímea Fülep

2013-01-01T23:59:59.000Z

349

Designing CPV Receivers With Reliability: Early Evaluation of Components  

E-Print Network (OSTI)

. Everett, A. Blakers Centre for Sustainable Energy Systems, The Australian National University, Canberra: Early detection of performance issues allows more rapid & reliable design optimisation. Thermal. Ultra light-weight Fresnel mirror enclosed system. DESIGN RELIABILITY PRODUCTION Early detection

350

Case Study: Fuel Cells Increase Reliability at First National...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Increase Reliability at First National Bank of Omaha Case Study: Fuel Cells Increase Reliability at First National Bank of Omaha First National Bank of Omaha installed a fuel cell...

351

Terms and Conditions  

NLE Websites -- All DOE Office Websites (Extended Search)

Terms and Conditions Terms and Conditions Terms and Conditions As a premier national research and development laboratory, LANL seeks to do business with qualified companies that offer value and high quality products and services. Contact Small Business Office (505) 667-4419 Email Use information below as guideline to doing business An "Appendix SFA-1" contains FAR and DEAR Clauses that are incorporated by reference into a particular subcontract. "Exhibit A General Conditions" are the general terms and conditions applicable to a particular subcontract. Note: The contents of the SFA-1 and Exhibit A (below) are not the only terms and conditions that will be in a LANS subcontract but represent the terms that generally do not change in a particular type of procurement. The

352

Human Reliability Program (HRP) - HPMC Occupational Health Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

353

Improving the Design Reliability of Petroleum Pipeline Components on Repair  

Science Journals Connector (OSTI)

Developments are considered that may appreciably improve the design reliability in the repair of petroleum pipeline components.

I. N. Karelin

354

Long-Term Surveillance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Long-Term Surveillance Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report September 2013 LMS/ESL/S10692 ESL-RPT-2013-03 This page intentionally left blank LMS/ESL/S10692 ESL-RPT-2013-03 Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report September 2013 This page intentionally left blank U.S. Department of Energy Long-Term Surveillance Operations and Maintenance FY 2013 Year-End Summary Report September 2013 Doc. No. S10692 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1

355

BPD Privacy Terms  

Energy.gov (U.S. Department of Energy (DOE))

The Building Performance Database Privacy Terms. This document must be reviewed and accepted when submitting data for use in the BPD.

356

Terms and Conditions  

NLE Websites -- All DOE Office Websites (Extended Search)

Testbed Results Current Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

357

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY  

E-Print Network (OSTI)

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY JIE LIN*, University of Illinois Institute A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY Abstract This paper develops and demonstrates a quality control framework for bus schedule reliability. Automatic Vehicle Location (AVL) devices

Illinois at Chicago, University of

358

RELIABILITY COMPARISON MODELS FOR OFFSHORE WIND TURBINES (OWT)  

E-Print Network (OSTI)

RELIABILITY COMPARISON MODELS FOR OFFSHORE WIND TURBINES (OWT) Yizhou Lu, T. M. Delorm, A. Christou of the reliability of these 5 Types Surrogate failure rate data Onshore wind turbines (OT) 1-1.5MW CONCLUSIONS., Faulstich, S. & van Bussel G. J. W. Reliability & availability of wind turbine electrical & electronic

Bernstein, Joseph B.

359

Photovoltaic Module Reliability Workshop 2014: February 25-26, 2014  

SciTech Connect

NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

Kurtz, S.

2014-02-01T23:59:59.000Z

360

Photovoltaic Module Reliability Workshop 2013: February 26-27, 2013  

SciTech Connect

NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

Kurtz, S.

2013-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Dynamically Quantifying and Improving the Reliability of Distributed Storage Systems  

E-Print Network (OSTI)

Dynamically Quantifying and Improving the Reliability of Distributed Storage Systems Rekha Bachwani,ricardob}@cs.rutgers.edu {gryz,dubnicki}@nec-labs.com Abstract In this paper, we argue that the reliability of large-scale storage systems can be significantly improved by using bet- ter reliability metrics and more efficient

Bianchini, Ricardo

362

Guest Editorial: Special Issue on Reliable Distributed Systems  

E-Print Network (OSTI)

Guest Editorial: Special Issue on Reliable Distributed Systems Shambhu J. Upadhyaya, Senior Member, designers, and implementers of distributed systems, with emphasis on system properties such as reliability with the 19th IEEE Symposium on Reliable Distributed Systems held at Nuernberg, Germany, 2000, but the topics

Firenze, Università degli Studi di

363

Reliability enhancement using optimal distribution feeder reconfiguration  

Science Journals Connector (OSTI)

Failure statistics show that distribution networks engage the most contribution to the customer unavailability services. Optimal reconfiguration of distribution systems has many advantages like total power losses reduction, voltage profile enhancement, reliability improvement and so on. Therefore, in this paper a new multiobjective improved shuffled frog leaping algorithm (ISFLA) is proposed to investigate the distribution feeder reconfiguration (DFR) problem from the reliability enhancement point of view. Nevertheless, since the total cost of MW loss is an important and attractive subject to the electric power utilities, the total active power losses is also considered as an objective function in the investigations. Therefore, the objective functions of the problem to be optimized are system average interruption frequency index (SAIFI), system average interruption duration index (SAIDI), average energy not supplied (AENS) and the total active power losses. During the optimization process, the proposed ISFLA finds a set of non-dominated optimal solutions referred to Pareto optimal solutions that are kept in an external memory called repository. As the result of the conflicting behavior of the objective functions investigated, a fuzzy clustering technique is employed to control the size of the repository in the predetermined limits. The feasibility and the efficiency of the proposed method are examined by a standard distribution test system.

Abdollah Kavousi-Fard; Mohammad-Reza Akbari-Zadeh

2013-01-01T23:59:59.000Z

364

Preliminary reliability and availability analysis of the Heber geothermal binary demonstration plant. Final report  

SciTech Connect

An assessment is presented of the reliability and availability of the Heber Geothermal Binary Demonstration Plant on the basis of preliminary design information. It also identifies and ranks components of the plant in order of their criticality to system operation and their contribution to system unavailability. The sensitivity of the various components to uncertainties of data and the potential for reliability growth are also examined. The assessment results were obtained through the adaptation and application of an existing reliability and availability methodology to the Heber plant design. These preliminary assessments were made to assist (1) in evaluating design alternatives for the plant and (2) in demonstrating that the closed-loop, multiple-fluid, binary cycle geothermal concept is competitive with the more conventional flashed steam cycle technology. The Heber Geothermal Binary Demonstration Plant Project is a cooperative effort directed toward accelerating geothermal development for power generation and establishing the binary cycle technology as a proven alternative to the flashed steam cycle for moderate temperature hydrothermal resources. The binary power plant would have a capacity of 45 MW/sub e/ net and would derive its energy from the low salinity (14,000 ppM), moderate temperature (360/sup 0/F, 182/sup 0/C) fluid from the Heber reservoir in southern California.

Himpler, H.; White, J.; Witt, J.

1981-10-01T23:59:59.000Z

365

Substations reliability-centered maintenance and predictive maintenance - a strategic partnership  

SciTech Connect

A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

1996-08-01T23:59:59.000Z

366

IEEE TRANSACTIONS ON RELIABILITY, VOL. 42, NO. 4, 1993 DECEMBER 641 Bayes Estimation of the Extreme-Value Reliability Function  

E-Print Network (OSTI)

& Conclusions-This paper obtainsBayesestimates of the reliability function of the extreme value distribution referred to as the Gumbel distribution, is widely used in reliability and life testing. This distribution estimatesof the reliability func- tion of the EV1 distribution using two well known Bayes ap- proximation

367

Reliable Networking Infrastructures A Brief Overview of Research in Reliable Networking  

E-Print Network (OSTI)

Institute FOKUS, Berlin ++ www.fokus.fraunhofer.de/go/innovation ++ 11­2009 #12;Security Reliable Networking structure (RNI) Group Launched by Dr.Yacine Rebahi and Dragos Ving arzan at Fraunhofer FOKUS. Senior at the Fraunhofer FOKUS competence center NGNI. Prior to joining FOKUS in 2002, he worked at Ericsson in Voice over

Wichmann, Felix

368

Reliable Power Inc | Open Energy Information  

Open Energy Info (EERE)

Power Inc Power Inc Jump to: navigation, search Name Reliable Power Inc Place Arlington, Virginia Zip VA 22201 Product US-based fuel cell manufacturer. Coordinates 43.337585°, -89.379449° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.337585,"lon":-89.379449,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

369

Radioisotope thermoelectric generator reliability and safety  

SciTech Connect

There are numerous occasions when a planetary mission requires energy in remote areas of the solar system. Anytime power is required much beyond Mars or the Asteroid Belts, solar power is not an option. The radioisotope thermoelectric generator (RTG) was developed for such a mission requirement. It is a relatively small and lightweight power source that can produce power under adverse conditions. Just this type of source has become the backbone of the power system for far outer plant exploration. Voyagers I and II are utilizing RTGs, which will soon power the Galileo spacecraft to Jupiter and the Ulysses spacecraft to study the solar poles. The paper discusses RTG operation including thermoelectric design, converter design, general-purpose heat source; RTG reliability including design, testing, experience, and launch approval; and RTG safety issues and methods of ensuring safety.

Campbell, R.; Klein, J.

1989-01-01T23:59:59.000Z

370

Increasing positive displacement charging pump reliability  

SciTech Connect

The use of positive displacement pumps in many PWRs is an integral part of providing reactivity control via the Chemical and Volume Control system. This usually requires the continuous operation of at least one pump, typically with a flow rate of 44 gpm {at} 2,310 psig (167 lpm {at} 160 bar). Some PWRs use multiple pumps, and vary the letdown, while others use variable speed pumps. Regardless, the charging pumps run continuously. With the amount of reciprocating mass, differential pressure, and friction, it is a battle to maintain the pumps in peak operating condition for long periods of time. This paper will show how Entergy Operations` Waterford 3 SES was able to increase the reliability of the positive displacement Charging Pumps. Many different solutions were evaluated, and several adopted. The results are undeniable, as availability has increased and O and M costs have been reduced by 90% over 6 years.

Wade, J.H. III [Entergy Operations, Inc., Killona, LA (United States)

1996-08-01T23:59:59.000Z

371

HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES  

SciTech Connect

This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

Ronald L. Boring; David I. Gertman; Katya Le Blanc

2011-09-01T23:59:59.000Z

372

RTI International Develops SSL Luminaire Reliability Model  

Energy.gov (U.S. Department of Energy (DOE))

With the help of DOE funding, RTI International is developing and validating accelerated life testing (ALT) methodologies and a reliability model for predicting the lifetime of integrated solid-state lighting luminaires. Since data is essential to building this model, the technical literature in the electronics and lighting communities has been extensively utilized. However, the general lack of certified information on luminaire failure modes (for both SSL luminaires and older technologies) has required that a majority of the effort during this work focus on understanding what happens during the luminaire aging process. This information is being used to identify potential failure modes, understand variations across a given product line, and ultimately determine how long testing will take.

373

Probabilistic fatigue methodology and wind turbine reliability  

SciTech Connect

Wind turbines subjected to highly irregular loadings due to wind, gravity, and gyroscopic effects are especially vulnerable to fatigue damage. The objective of this study is to develop and illustrate methods for the probabilistic analysis and design of fatigue-sensitive wind turbine components. A computer program (CYCLES) that estimates fatigue reliability of structural and mechanical components has been developed. A FORM/SORM analysis is used to compute failure probabilities and importance factors of the random variables. The limit state equation includes uncertainty in environmental loading, gross structural response, and local fatigue properties. Several techniques are shown to better study fatigue loads data. Common one-parameter models, such as the Rayleigh and exponential models are shown to produce dramatically different estimates of load distributions and fatigue damage. Improved fits may be achieved with the two-parameter Weibull model. High b values require better modeling of relatively large stress ranges; this is effectively done by matching at least two moments (Weibull) and better by matching still higher moments. For this purpose, a new, four-moment {open_quotes}generalized Weibull{close_quotes} model is introduced. Load and resistance factor design (LRFD) methodology for design against fatigue is proposed and demonstrated using data from two horizontal-axis wind turbines. To estimate fatigue damage, wind turbine blade loads have been represented by their first three statistical moments across a range of wind conditions. Based on the moments {mu}{sub 1}{hor_ellipsis}{mu}{sub 3}, new {open_quotes}quadratic Weibull{close_quotes} load distribution models are introduced. The fatigue reliability is found to be notably affected by the choice of load distribution model.

Lange, C.H. [Stanford Univ., CA (United States)

1996-05-01T23:59:59.000Z

374

IEEE TRANSACTIONS ON RELIABILITY, VOL. 55, NO. 1, MARCH 2006 123 Quality-Oriented-Maintenance for Multiple  

E-Print Network (OSTI)

variables with multidimensional product quality. It can be obtained either from engineering analysisIEEE TRANSACTIONS ON RELIABILITY, VOL. 55, NO. 1, MARCH 2006 123 Quality, product quality, often defined in terms of the dimensional integrity of work pieces, is jointly affected

Jin, Jionghua "Judy"

375

Techniques to evaluate the importance of common cause degradation on reliability and safety of nuclear weapons.  

SciTech Connect

As the nuclear weapon stockpile ages, there is increased concern about common degradation ultimately leading to common cause failure of multiple weapons that could significantly impact reliability or safety. Current acceptable limits for the reliability and safety of a weapon are based on upper limits on the probability of failure of an individual item, assuming that failures among items are independent. We expanded the current acceptable limits to apply to situations with common cause failure. Then, we developed a simple screening process to quickly assess the importance of observed common degradation for both reliability and safety to determine if further action is necessary. The screening process conservatively assumes that common degradation is common cause failure. For a population with between 100 and 5000 items we applied the screening process and conclude the following. In general, for a reliability requirement specified in the Military Characteristics (MCs) for a specific weapon system, common degradation is of concern if more than 100(1-x)% of the weapons are susceptible to common degradation, where x is the required reliability expressed as a fraction. Common degradation is of concern for the safety of a weapon subsystem if more than 0.1% of the population is susceptible to common degradation. Common degradation is of concern for the safety of a weapon component or overall weapon system if two or more components/weapons in the population are susceptible to degradation. Finally, we developed a technique for detailed evaluation of common degradation leading to common cause failure for situations that are determined to be of concern using the screening process. The detailed evaluation requires that best estimates of common cause and independent failure probabilities be produced. Using these techniques, observed common degradation can be evaluated for effects on reliability and safety.

Darby, John L.

2011-05-01T23:59:59.000Z

376

Uncertainty evaluation of reliability of safety grade decay heat removal system of Indian prototype fast breeder reactor  

Science Journals Connector (OSTI)

Abstract Deterministic and probabilistic safety assessment of nuclear power reactor technology is very important in assuring that the design is robust and safety systems perform as per requirement. The parameters required as input data for such analysis have uncertainties associated with them. Their impact is to be assessed on the results obtained for such analyses and it affects the overall decision making process. Safety Grade Decay Heat Removal System (SGDHRS) is one of the safety systems in fast breeder reactors and itremoves decay heat after reactor shutdown. It is a critical safety system; hence failure frequency for SGDHR is targeted to be less than 1.0 × 10?7 per reactor year. By bringing diversity in some of the components of SGDHRS, such as sodium-to-sodium decay heat exchanger (DHX), sodium to air heat exchanger (AHX) and valves, one can achieve the targeted low failure frequency of SGDHRS. We perform uncertainty analysis of the reliability of such SGDHRS here. Uncertainty in failure rate (of components of SGDHRS) is assumed to follow the log-normal distribution with error factor of three. Monte Carlo method of sampling is used in MATLAB environment. Results are obtained in terms of mean, median and standard deviation values of failure frequency. Percentile and confidence interval analysis of mean values are also obtained. These provide 95 and 98 percentile and confidence interval values of 98%, 99% and 99.8%. It is found that error factor of failure frequency of SGDHRS is found to be less than 3 in all the cases except the one in which DHX, AHX and Valves are designed with diversity in design. It is to be noted here that error factor of all input parameters distribution is taken as 3.

H.L. Kumawat; Om Pal Singh; Prabhat Munshi

2013-01-01T23:59:59.000Z

377

Terms and Conditions | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

usage, consumables, materials, and EMSL staff travel. Under the terms of the DOE class waiver, users engaged in proprietary research are obligated to pay the full-cost recovery...

378

Document Type: Subject Terms  

E-Print Network (OSTI)

Title: Authors: Source: Document Type: Subject Terms: Abstract: Full Text Word Count: ISSN the department back on track. The action is to call a meeting of the team leaders and stress the urgency o

Major, Arkady

379

Terms and Conditions  

NLE Websites -- All DOE Office Websites (Extended Search)

Terms and Conditions Terms and Conditions R&D Overview 100G Testbed Testbed Description Testbed Results Current Testbed Research Proposal Process Terms and Conditions Virtual Circuits (OSCARS) Performance (perfSONAR) Tools Development Green Networking Authentication & Trust Federation (ATF) Partnerships Contact Us Technical Assistance: 1 800-33-ESnet (Inside the US) 1 800-333-7638 (Inside the US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Terms and Conditions Researchers must provide ESnet copies of any articles, presentations, and publications based on testbed research for posting on the ESnet Testbed web site. All publications based on work conducted on the testbed must include the following statement:

380

Authenticated writing assessments of agricultural education graduate students  

E-Print Network (OSTI)

for evaluating and scoring student writing tests using both the overall and sentence-level structure assessment rubrics. The reliability and validity of the Writing Program rubric were established through another previous study (Ashe, 1994). A prediction...

Wright, Kimberly Dawn

2004-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

E-Print Network 3.0 - achieve reliable information Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

reliable information Search Powered by Explorit Topic List Advanced Search Sample search results for: achieve reliable information Page: << < 1 2 3 4 5 > >> 1 On the Reliability of...

382

Reliability-based characterization of prefabricated FRP composites for rehabilitation of concrete structures  

E-Print Network (OSTI)

or nonnormal distributions; the reliability index ? dependsOF DISTRIBUTION FITTING ROUTINE %Calculation of ReliabilityDistribution and Distribution Parameters of Resistance Variables Considered for Reliability

Jin, Sung-Jun

2008-01-01T23:59:59.000Z

383

Enhancing Lifetime Reliability Of Chip Multiprocessors Through 3D Resource Sharing  

E-Print Network (OSTI)

macroscopic distribution of failures in reliability design.in reliability analysis than the exponential distribution [distributions can be used to provide a methodology for simulating lifetime reliability

Strikos, Nikolaos

384

Reliable and redundant FPGA based read-out design in the ATLAS TileCal Demonstrator  

E-Print Network (OSTI)

The Tile Calorimeter at ATLAS is a hadron calorimeter based on steel plates and scintillating tiles read out by PMTs. The current read-out system uses standard ADCs and custom ASICs to digitize and temporarily store the data on the detector. However, only a subset of the data is actually read out to the counting room. The on-detector electronics will be replaced around 2023. To achieve the required reliability the upgraded system will be highly redundant. Here the ASICs will be replaced with Kintex-7 FPGAs from Xilinx. This, in addition to the use of multiple 10 Gbps optical read-out links, will allow a full read-out of all detector data. Due to the higher radiation levels expected when the beam luminosity is increased, opportunities for repairs will be less frequent. The circuitry and firmware must therefore be designed for sufficiently high reliability using redundancy and radiation tolerant components. Within a year, a hybrid demonstrator including the new read-out system will be installed in one slice of the ATLAS Tile Calorimeter. This will allow the proposed upgrade to be thoroughly evaluated well before the planned 2023 deployment in all slices, especially with regard to long term reliability. Different firmware strategies alongside with their integration in the demonstrator are presented in the context of high reliability protection against hardware malfunction and radiation induced errors.

Henrik Åkerstedt; Steffen Muschter; Gary Drake; Kelby Anderson; Christian Bohm; Mark Oreglia; Fukun Tang

2014-06-23T23:59:59.000Z

385

Wind Power Reliability: Breaking Down a Barrier | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wind Power Reliability: Breaking Down a Barrier Wind Power Reliability: Breaking Down a Barrier Wind Power Reliability: Breaking Down a Barrier June 25, 2010 - 12:16pm Addthis EnerNex Corporation is developing documentation and validating generic wind turbine and plant models that test reliability. | File photo EnerNex Corporation is developing documentation and validating generic wind turbine and plant models that test reliability. | File photo Stephen Graff Former Writer & editor for Energy Empowers, EERE The steady increase of wind power on the grid presents new challenges for power system operators charged with making sure the grid stays up and running. "We need to ensure that we are going down a path that will lead to better reliability [with wind power]," said Bob Zavadil, an executive vice

386

New International Program to Asses the Reliability of Emerging Nondestructive Techniques (PARENT)  

SciTech Connect

The Nuclear Regulatory Commission (NRC) established the Program to Assess the Reliability of Emerging Nondestructive Techniques (PARENT) to follow on from the successful Program for the Inspection of Nickel alloy Components (PINC). The goal of the PARENT is to conduct a confirmatory assessment of the reliability of nondestructive evaluation (NDE) techniques for detecting and sizing primary water stress corrosion cracks (PWSCC) and applying the lessons learned from PINC to a series of round-robin tests. These open and blind round-robin tests will comprise a new set of typical pressure boundary components including dissimilar metal welds (DMWs) and bottom-mounted instrumentation penetrations. Open round-robin tests will engage research and industry teams worldwide to investigate and demonstrate the reliability of emerging NDE techniques to detect and size flaws with a wide range of lengths, depths, orientations, and locations. Blind round-robin tests will utilize various testing organizations, whose inspectors and procedures are certified by the standards for the nuclear industry in their respective countries, to investigate the ability of established NDE techniques to detect and size flaws whose characteristics range from relatively easy to very difficult for detection and sizing. Blind and open round-robin testing started in late 2011 and early 2012, respectively. This paper will present the work scope with reports on progress, NDE methods evaluated, and project timeline for PARENT.

Prokofiev, Iouri; Cumblidge, Stephen E.; Csontos, Aladar A.; Braatz, Brett G.; Doctor, Steven R.

2013-01-25T23:59:59.000Z

387

Computational Thermochemistry and Benchmarking of Reliable Methods  

SciTech Connect

During the first and second years of the Computational Thermochemistry and Benchmarking of Reliable Methods project, we completed several studies using the parallel computing capabilities of the NWChem software and Molecular Science Computing Facility (MSCF), including large-scale density functional theory (DFT), second-order Moeller-Plesset (MP2) perturbation theory, and CCSD(T) calculations. During the third year, we continued to pursue the computational thermodynamic and benchmarking studies outlined in our proposal. With the issues affecting the robustness of the coupled cluster part of NWChem resolved, we pursued studies of the heats-of-formation of compounds containing 5 to 7 first- and/or second-row elements and approximately 10 to 14 hydrogens. The size of these systems, when combined with the large basis sets (cc-pVQZ and aug-cc-pVQZ) that are necessary for extrapolating to the complete basis set limit, creates a formidable computational challenge, for which NWChem on NWMPP1 is well suited.

Feller, David F.; Dixon, David A.; Dunning, Thom H.; Dupuis, Michel; McClemore, Doug; Peterson, Kirk A.; Xantheas, Sotiris S.; Bernholdt, David E.; Windus, Theresa L.; Chalasinski, Grzegorz; Fosada, Rubicelia; Olguim, Jorge; Dobbs, Kerwin D.; Frurip, Donald; Stevens, Walter J.; Rondan, Nelson; Chase, Jared M.; Nichols, Jeffrey A.

2006-06-20T23:59:59.000Z

388

Human Reliability Considerations for Small Modular Reactors  

SciTech Connect

Small modular reactors (SMRs) are a promising approach to meeting future energy needs. Although the electrical output of an individual SMR is relatively small compared to that of typical commercial nuclear plants, they can be grouped to produce as much energy as a utility demands. Furthermore, SMRs can be used for other purposes, such as producing hydrogen and generating process heat. The design characteristics of many SMRs differ from those of current conventional plants and may require a distinct concept of operations. The U.S. Nuclear Regulatory Commission (NRC) conducted research to examine the human factors engineering and the operational aspects of SMRs. The research identified thirty potential human-performance issues that should be considered in the NRC's reviews of SMR designs and in future research activities. The purpose of this report is to illustrate how the issues can support SMR probabilistic risk analyses and their review by identifying potential human failure events for a subset of the issues. As part of addressing the human contribution to plant risk, human reliability analysis practitioners identify and quantify the human failure events that can negatively impact normal or emergency plant operations. The results illustrated here can be generalized to identify additional human failure events for the issues discussed and can be applied to those issues not discussed in this report.

OHara J. M.; Higgins, H.; DAgostino, A.; Erasmia, L.

2012-01-27T23:59:59.000Z

389

Individual Differences in Human Reliability Analysis  

SciTech Connect

While human reliability analysis (HRA) methods include uncertainty in quantification, the nominal model of human error in HRA typically assumes that operator performance does not vary significantly when they are given the same initiating event, indicators, procedures, and training, and that any differences in operator performance are simply aleatory (i.e., random). While this assumption generally holds true when performing routine actions, variability in operator response has been observed in multiple studies, especially in complex situations that go beyond training and procedures. As such, complexity can lead to differences in operator performance (e.g., operator understanding and decision-making). Furthermore, psychological research has shown that there are a number of known antecedents (i.e., attributable causes) that consistently contribute to observable and systematically measurable (i.e., not random) differences in behavior. This paper reviews examples of individual differences taken from operational experience and the psychological literature. The impact of these differences in human behavior and their implications for HRA are then discussed. We propose that individual differences should not be treated as aleatory, but rather as epistemic. Ultimately, by understanding the sources of individual differences, it is possible to remove some epistemic uncertainty from analyses.

Jeffrey C. Joe; Ronald L. Boring

2014-06-01T23:59:59.000Z

390

Optimal reliability-based planning of experiments for POD curves  

SciTech Connect

Optimal planning of crack detection tests is considered. The tests are used to update the information on the reliability of inspection techniques modeled by probability of detection (P.O.D.) curves. It is shown how cost-optimal and reliability-based test plans can be obtained using First Order Reliability Methods in combination with life-cycle cost-optimal inspection and maintenance planning. The methodology is based on preposterior analyses from Bayesian decisions theory. An illustrative example is shown.

Soerensen, J.D. [Univ. of Aalborg (Denmark). Dept. of Building Technology and Structural Engineering; Faber, M.H.; Kroon, I.B. [COWIconsult Consulting Engineers and Planners AS, Lyngby (Denmark). Transportation Div.

1995-12-31T23:59:59.000Z

391

EPRI/NRC-RES fire human reliability analysis guidelines.  

SciTech Connect

During the 1990s, the Electric Power Research Institute (EPRI) developed methods for fire risk analysis to support its utility members in the preparation of responses to Generic Letter 88-20, Supplement 4, 'Individual Plant Examination - External Events' (IPEEE). This effort produced a Fire Risk Assessment methodology for operations at power that was used by the majority of U.S. nuclear power plants (NPPs) in support of the IPEEE program and several NPPs overseas. Although these methods were acceptable for accomplishing the objectives of the IPEEE, EPRI and the U.S. Nuclear Regulatory Commission (NRC) recognized that they required upgrades to support current requirements for risk-informed, performance-based (RI/PB) applications. In 2001, EPRI and the USNRC's Office of Nuclear Regulatory Research (RES) embarked on a cooperative project to improve the state-of-the-art in fire risk assessment to support a new risk-informed environment in fire protection. This project produced a consensus document, NUREG/CR-6850 (EPRI 1011989), entitled 'Fire PRA Methodology for Nuclear Power Facilities' which addressed fire risk for at power operations. NUREG/CR-6850 developed high level guidance on the process for identification and inclusion of human failure events (HFEs) into the fire PRA (FPRA), and a methodology for assigning quantitative screening values to these HFEs. It outlined the initial considerations of performance shaping factors (PSFs) and related fire effects that may need to be addressed in developing best-estimate human error probabilities (HEPs). However, NUREG/CR-6850 did not describe a methodology to develop best-estimate HEPs given the PSFs and the fire-related effects. In 2007, EPRI and RES embarked on another cooperative project to develop explicit guidance for estimating HEPs for human failure events under fire generated conditions, building upon existing human reliability analysis (HRA) methods. This document provides a methodology and guidance for conducting a fire HRA. This process includes identification and definition of post-fire human failure events, qualitative analysis, quantification, recovery, dependency, and uncertainty. This document provides three approaches to quantification: screening, scoping, and detailed HRA. Screening is based on the guidance in NUREG/CR-6850, with some additional guidance for scenarios with long time windows. Scoping is a new approach to quantification developed specifically to support the iterative nature of fire PRA quantification. Scoping is intended to provide less conservative HEPs than screening, but requires fewer resources than a detailed HRA analysis. For detailed HRA quantification, guidance has been developed on how to apply existing methods to assess post-fire fire HEPs.

Lewis, Stuart R. (Electric Power Research Institute, Charlotte, NC); Cooper, Susan E. (U.S. Nuclear Regulatory Commission, Rockville, MD); Najafi, Bijan (SAIC, Campbell, CA); Collins, Erin (SAIC, Campbell, CA); Hannaman, Bill (SAIC, Campbell, CA); Kohlhepp, Kaydee (Scientech, Tukwila, WA); Grobbelaar, Jan (Scientech, Tukwila, WA); Hill, Kendra (U.S. Nuclear Regulatory Commission, Rockville, MD); Hendrickson, Stacey M. Langfitt; Forester, John Alan; Julius, Jeff (Scientech, Tukwila, WA)

2010-03-01T23:59:59.000Z

392

General Order Ensuring Reliable Electric Service (Louisiana) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Order Ensuring Reliable Electric Service (Louisiana) General Order Ensuring Reliable Electric Service (Louisiana) General Order Ensuring Reliable Electric Service (Louisiana) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Louisiana Program Type Safety and Operational Guidelines Provider Louisiana Public Service Commission The standards set forth herein have been developed to provide consumers, the Louisiana Public Service Commission, and jurisdictional electric utilities with a uniform method of ensuring reliable electric service. The standards shall be applicable to the distribution systems of all electric utilities under the jurisdiction of the Louisiana Public Service

393

Innovation Impact, Wind: NREL Collaborative Improves the Reliability...  

NLE Websites -- All DOE Office Websites (Extended Search)

Collaborative Improves the Reliability of Wind Turbine Gearboxes Gearbox failures have a significant impact on the cost of wind farm operations. To help minimize gearbox failures,...

394

Competition and Reliability in North American Electricity Markets...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations Competition and Reliability in North American Energy Markets: Issue Paper Synopses...

395

Competition and Reliability in North American Energy Markets...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Markets: Issue Paper Synopses Competition and Reliability in North American Energy Markets: Issue Paper Synopses Jack Casazza, Frank Delea, and George Loehr argue that...

396

Improved Usage Model for Web Application Reliability Testing .  

E-Print Network (OSTI)

??Testing the reliability of an application usually requires a good usage model that accurately captures the likely sequences of inputs that the application will receive… (more)

Wan, Bo

2012-01-01T23:59:59.000Z

397

2014 Transmission Reliability Program Peer Review- Day 1 Presentations  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3 - 4. Presentations from Day 1 (Sessions I through IV) are available here.

398

2014 Transmission Reliability Program Peer Review- Day 2 Presentations  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 6 sessions over 2 days on June 3 - 4, 2014. Presentations from Day 2 (Sessions V and VI) are available here.

399

NREL Study of Fielded PV Systems Demonstrates PV Reliability...  

NLE Websites -- All DOE Office Websites (Extended Search)

modules and systems has decreased sig- nificantly. However, NREL's analysis of Section 1603 of the American Recovery and Reinvestment Tax Act of field performance, reliability,...

400

Reliability Models for Facility Location: The Expected Failure Cost ...  

E-Print Network (OSTI)

Reliability Models for Facility Location: The Expected Failure Cost Case. Lawrence V. Snyder (larry.snyder ***at*** lehigh.edu) Mark S. Daskin (m-daskin *

Lawrence V. Snyder

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Thermal Stress and Reliability for Advanced Power Electronics...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermal Stress and Reliability for Advanced Power Electronics and Electric Machines Power Electronic Thermal System Performance and Integration Thermal Performance and...

402

Combined Heat and Power System Enables 100% Reliability at Leading...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

buildings on nearly 1,000 acres. Photo courtesy of Thermal Energy Corporation Combined Heat and Power System Enables 100% Reliability at Leading Medical Campus Recovery Act...

403

Forward Capacity Markets: Maintaining Grid Reliability in Europe.  

E-Print Network (OSTI)

?? The liberalization process of the electricity industry in many countries leads to new rules and new challenges for the grid management. System reliability is… (more)

Chaigneau, Matthieu

2012-01-01T23:59:59.000Z

404

Energy Department Invests Over $10 Million to Improve Grid Reliability...  

Office of Environmental Management (EM)

day-to-day grid reliability. "Through advanced sensors and monitoring devices, U.S. utilities now have unprecedented insight into the power grid - helping industry make decisions...

405

Office of Electricity Delivery and Energy Reliability | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office of Electricity Delivery and Energy Reliability Community Guidelines for Energy Emergencies Community Guidelines for Energy Emergencies Read more Smart Grid Investments...

406

Office of Electricity Delivery And Energy Reliability To Hold...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy...

407

"Increasing Solar Panel Efficiency And Reliability By Evaporative...  

NLE Websites -- All DOE Office Websites (Extended Search)

Increasing Solar Panel Efficiency And Reliability By Evaporative Cooling" Inventors..--.. Lewis Meixler, Charles Gentile, Patricia Hillyer, Dylan Carpe, Jason Wang, Caroline Brooks...

408

Proposed EPA Rules Will Cut Carbon Pollution While Maintaining Reliability  

Energy.gov (U.S. Department of Energy (DOE))

The Energy Department is committed to supporting successful implementation of EPA’s Clean Power Plan while maintaining electric grid reliability.

409

Distribution system reliability analysis for smart grid applications.  

E-Print Network (OSTI)

??Reliability of power systems is a key aspect in modern power system planning, design, and operation. The ascendance of the smart grid concept has provided… (more)

Aljohani, Tawfiq Masad

2014-01-01T23:59:59.000Z

410

Designing shipboard electrical distribution systems for optimal reliability.  

E-Print Network (OSTI)

??Analysis was performed to quantify and compare the reliability of several different notional shipboard DC distribution system topologies in serving their equipment loads. Further, the… (more)

Stevens, McKay Benjamin

2013-01-01T23:59:59.000Z

411

Long-term stabilisation of grid connected wind farms with FACTS controllers  

Science Journals Connector (OSTI)

The increasing power demand has led to the growth of new technologies that play an integral role in shaping the future energy market. Keeping in view of the environmental constraints, grid connected wind turbines are promising in increasing system reliability. This paper presents the impact of FACTS controllers on the long-term dynamic stability of power systems connected with wind farms based on doubly fed induction generator systems. The stability assessment is made first for a three-phase short circuit without the FACTS controllers in the power network and then with the FACTS controllers. The long-term dynamic simulation results yield information on: 1) the impact of faults and slow wind speed changes on the performance of wind driven induction generators; 2) the change in controllable parameters of the FACTS controllers following the faults and wind speed changes; 3) transient reactive power ratings of FACTS controllers for enhancement of rotor speed stability of induction generators and angle stability of synchronous generators.

N. Senthil Kumar; M. Abdullah Khan

2010-01-01T23:59:59.000Z

412

Human Reliability Program Semi-Structure Inteview Component ORISE-04-0116  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Office of Security U. S. Department of Energy HUMAN RELIABILITY PROGRAM Semi-Structured Interview Component Center for Human Reliability Studies Oak Ridge Institute for Science and Education Operated by Oak Ridge Associated Universities For the U. S. Department of Energy Oak Ridge Associated Universities (ORAU) is a university consortium leveraging the scientific strength of major research institutions to advance science and education by partnering with national laboratories, government agencies, and private industry. ORAU manages the Oak Ridge Institute for Science and Education for the U.S. Department of Energy (DOE). Oak Ridge Institute for Science and Education (ORISE) is a DOE facility focusing on scientific initiatives to research health risks from occupational hazards, assess environmental cleanup, respond to radiation medical

413

U.S. Department of Energy Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Delivery and Energy Reliability Electricity Delivery and Energy Reliability Infrastructure Security and Energy Restoration INSURANCE AS A RISK MANAGEMENT INSTRUMENT FOR ENERGY INFRASTRUCTURE SECURITY AND RESILIENCE Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience U.S. Department of Energy March 2013 Page ii of viii This page intentionally left blank. Insurance as a Risk Management Instrument for Energy Infrastructure Security and Resilience U.S. Department of Energy March 2013 Page iii of viii Preface This study examines key risks that the Nation's critical energy infrastructure is confronting and the ways in which the insurance industry can help manage these risks, including how it identifies, assesses, and manages them and their potential impacts. Today, weather-related

414

2012 CERTS Transmission Reliability R&D Internal Program Review - Agenda  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY12 DOE - CERTS Transmission Reliability R&D FY12 DOE - CERTS Transmission Reliability R&D Internal Program Review June 12-13, 2012 LBNL Project Office 901 D St., SW Washington DC Nancy Lewis' cell: 510.918.3155 Revised Agenda: June 5, 2012 June 12, Day 1 7:30: Refreshments 8 - 8:30: Welcome, Introductions, DOE remarks Phil Overholt, DOE; Carl Imhoff, PNNL; Joe Eto, LBNL SESSION I: 20 minute presentations & 10 minutes Q&A 8:30 - 9: Measurement-Based Stability Assessment, Dan Trudnowski, University of Montana 9 - 9:30: Mode Meter Development, Ning Zhou, PNNL 9:30 - 10: Oscillation Monitoring System, Mani Venkatasubramanian, WSU 10 - 10:30: Break SESSION II: 20 minute presentations & 10 minutes Q&A 10:30 - 11: Baselining Studies and Analysis, Brett Amidan, PNNL

415

A RAM (Reliability Availability Maintainability) analysis of Consolidated Edison's Gowanus and Narrows gas turbine power plants  

SciTech Connect

A methodology is presented which accurately assesses the ability of gas turbine generating stations to perform their intended function (reliability) while operating in a peaking duty mode. The developed methodology alloys the RAM modeler to calculate the probability that a peaking unit will produce the energy demanded and in turn calculate the total energy lost during a given time period due to unavailability of individual components. The methodology was applied to Consolidated Edison's Narrows site which has 16 barge-mounted General Electric Frame 5 gas turbines operating under a peaking duty mode. The resulting RAM model was quantified using the Narrows site power demand and failure rate data. The model was also quantified using generic failure data from the Operational Reliability Analysis Program (ORAP) for General Electric Frame 5 peaking gas turbines. A problem description list and counter measures are offered for components contributing more than one percent to gas turbine energy loss. 3 refs., 18 figs., 12 tabs.

Johnson, B.W.; Whitehead, T.J.; Derenthal, P.J. (Science Applications International Corp., Los Altos, CA (USA))

1990-12-01T23:59:59.000Z

416

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

417

Advanced Network Toolkit for Assessments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Network Toolkit for Assessments Network Toolkit for Assessments and Remote Mapping (ANTFARM) Uses existing information to passively map control systems networks and identify cyber security perimeters Control systems operators require a map of their energy control system network in order to identify its electronic security perimeter, critical to meeting the North American Electric Reliability Corporation's (NERC) Critical Infrastructure Protection (CIP) standards. However, purchasing active, online scanning tools specifically for network mapping can be costly, and these tools can disrupt control system function, causing system latency and possibly affecting power supply. The ANTFARM software tool enables system operators to remotely and

418

Hoisting & Rigging Assessment Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HOISTING & RIGGING HOISTING & RIGGING Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: To determine that hoisting and rigging operations are conducted according to "industry best standards" for increasing equipment reliability while assuring worker safety, and to verify issues being addressed in BN Hoisting assessment. Criteria: Lifts are identified and categorized appropriately for scheduled maintenance. DOE-STD-1090-2001 An integrated process ensures safety issues are identified and controls established. DOE-STD-1090-2001 Personnel operating and maintaining the hoisting equipment are trained; they understand their roles and responsibilities. DOE-STD-1090-2001 Maintenance conducts safety inspections of hoisting and rigging

419

Pruning Simply Typed -terms  

Science Journals Connector (OSTI)

......looking for the smallest pout > r /) 6out > //_ gout > B,, c/) pout > p such that: pout...and pout h ^out . Bout b y minimaiKy o f tout gout pout w e deduce; 6out gout gout^ pout < pout Pruning Simply Typed A-terms......

STEFANO BERARDI

1996-10-01T23:59:59.000Z

420

UNCORRECTED Reliability analysis of hybrid ceramic/steel gun barrels  

E-Print Network (OSTI)

UNCORRECTED PROOF Reliability analysis of hybrid ceramic/steel gun barrels M. GRUJICIC1 , J. R-5069, USA Received in final form 25 February 2002 AB ST R AC T Failure of the ceramic gun-barrel lining probability for the lining is also discussed. Keywords failure; gun-barrel lining; reliability; thermo

Grujicic, Mica

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A model and framework for reliable build systems Derrick Coetzee  

E-Print Network (OSTI)

A model and framework for reliable build systems Derrick Coetzee Anand Bhaskar George Necula, requires prior specific permission. #12;A model and framework for reliable build systems Derrick Coetzee- distributed, incremental, parallel build systems. We de- fine a general model for resources accessed by build

Necula, George

422

Reliability: The Other Dimension of Quality William Q. Meeker  

E-Print Network (OSTI)

the relationship between engineering quality and reliability and outline the role of statistics and statisticiansReliability: The Other Dimension of Quality William Q. Meeker Department of Statistics Iowa State in the use of statistical methods for product quality. Tools for process monitoring and, particularly

423

Low cost highly reliable telemetry module for space applications  

Science Journals Connector (OSTI)

In this paper we demonstrate a low cost highly reliable telemetry module design suitable for low orbit satellites based on commercial or industrial components. The proposed telemetry module configuration employs on shelf components to achieve 3 Kg weight, ... Keywords: highly reliable design, low orbit satellite, space application, telemetry module

Aladin S. Abdelaziz; Ahmed M. Mahmoud

2006-12-01T23:59:59.000Z

424

Architecture-driven reliability optimization with uncertain model parameters  

Science Journals Connector (OSTI)

It is currently considered good software engineering practice to decide between design alternatives based on quantitative architecture evaluations for different quality attributes, such as reliability and performance. However, the results of these quantitative ... Keywords: Architecture optimization, Monte-Carlo simulation, Parameter uncertainty, Probabilistic quality prediction, Reliability

Indika Meedeniya; Aldeida Aleti; Lars Grunske

2012-10-01T23:59:59.000Z

425

Separating myths from reality in PV inverter reliability  

E-Print Network (OSTI)

requires electrolytics #12;Reliability predictor models · MIL-HDBK 217F ­ Last updated in 1995 ­ Does the reliability claims of microinverters dubious. #12;Does what affects string inverters affect microinverters? · In 2006 NCI was commissioned to determine feasibility of DOE goal of $0.25/Watt for inverters by 2020

Rollins, Andrew M.

426

An approach for lifetime reliability analysis using theorem proving  

Science Journals Connector (OSTI)

Recently proposed formal reliability analysis techniques have overcome the inaccuracies of traditional simulation based techniques but can only handle problems involving discrete random variables. In this paper, we extend the capabilities of existing ... Keywords: Failure rate, Formal methods, Fractile function, HOL, Hazard function, Lifetime analysis, Random variables, Reliability analysis, Statistical properties, Theorem proving

Naeem Abbasi; Osman Hasan; Sofiène Tahar

2014-03-01T23:59:59.000Z

427

GPGPUs: How to Combine High Computational Power with High Reliability  

E-Print Network (OSTI)

recent results derived from radiation experiments about the reliability of GPGPUs. Third, it describes of applications running on GPGPUs. Keywords--GPGPUs, reliability, HPC, fault injection, radiation experiments I in mobile computing and in some embedded system applications. In the latter case safety is sometimes a key

Gurumurthi, Sudhanva

428

System Reliability Model for Solid-State Lighting Luminaires  

Energy.gov (U.S. Department of Energy (DOE))

This project is developing and validating a probabilistic reliability prediction tool, and accelerated life testing methodologies, to help lighting manufacturers and stakeholders answer two questions: (1) How can the promised reliability for a rapidly changing technology platform be ensured?, and (2) What will the usage and maintenance profiles be for a product that lasts 15 years?

429

Operating Systems: The Problems Of Performance and Reliability  

E-Print Network (OSTI)

Operating Systems: The Problems Of Performance and Reliability B. Randell University of Newcastle and reliability are amongst the most difficult that operating system designers and implementors have to face. This is particularly the case with generic operating systems, i.e., systems intended for use in many different versions

Newcastle upon Tyne, University of

430

Development of a Successful Program in Reliability and Maintainability Engineering  

E-Print Network (OSTI)

­ Video or audio clips #12;Graduate Programs in Reliability Maintenance and EngineeringDevelopment of a Successful Program in Reliability and Maintainability Engineering Dr. Wes Hines Head, Nuclear Engineering College of Engineering The University of Tennessee jhines2@utk.edu UMD

Bernstein, Joseph B.

431

Assessment Report  

Energy Savers (EERE)

Assessment Report Assessment of Audit Coverage of Cost Allowability for Lawrence Livermore National Laboratory under Department of Energy Contract No. DE-AC52-07NA27344 during...

432

Office of Electricity Delivery &amp; Energy Reliability Contributors |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery & Energy Reliability » Office of Office of Electricity Delivery & Energy Reliability » Office of Electricity Delivery & Energy Reliability Contributors Office of Electricity Delivery & Energy Reliability Contributors June 20, 2012 David Ortiz, OE-40 David Ortiz is Deputy Assistant Secretary for Energy Infrastructure Modeling and Analysis (EIMA) in the Department of Energy's Office of Electrici April 25, 2013 Eric Lightner June 22, 2011 Henry S. Kenchington, OE-50 Mr. Henry (Hank) Kenchington is Deputy Assistant Secretary (DAS) for the Advanced Grid Integration Division in the Department of Energy's Office of Electricity Delivery and Energy Reliability. He is responsible for the strategic management of the $3.4 billion Smart Grid Investment Grant program funded under the American Recovery and Reinvestment Act of 2009 to

433

North American Electric Reliability Council Power Outage Update |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Outage Update Power Outage Update North American Electric Reliability Council Power Outage Update The bulk electric transmission system in the United States and Canada has been restored and is operating reliably. Many of the generating units that tripped off line during the outage have returned to service and additional generating units are expected to return to service over the weekend. Virtually all customers have been returned to electric service, although some customers will continue to experience rotating outages due to generating capacity availability. North American Electric Reliability Council Power Outage Update More Documents & Publications Electric System Update: Sunday August 17, 2003 North American Electric Reliability Council Outage Announcement NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

434

Reliability modeling of demand response considering uncertainty of customer behavior  

Science Journals Connector (OSTI)

Abstract Demand response (DR) has been considered as a generation alternative to improve the reliability indices of the system and load point. However, when the demand resources scheduled in the DR market fail to result in demand reductions, it can potentially bring new problems associated with maintaining a reliable supply. In this paper, a reliability model of the demand resource is constructed considering customers’ behaviors in the same form as conventional generation units, where the availability and unavailability are associated with the simple two-state model. The reliability model is generalized by a multi-state model. In the integrated power market with DR, market players provide the demand reduction and generation, which are represented by an equivalent multi-state demand response and generation, respectively. The reliability indices of the system and load point are evaluated using the optimal power flow by minimizing the summation of load curtailments with various constraints.

Hyung-Geun Kwag; Jin-O Kim

2014-01-01T23:59:59.000Z

435

Glossary Term - Neptune  

NLE Websites -- All DOE Office Websites (Extended Search)

Mole Mole Previous Term (Mole) Glossary Main Index Next Term (Neutrino) Neutrino Neptune Neptune as seen by the Voyager II spacecraft on August 14, 1989. Neptune is the eighth planet from the sun and takes 165 years to orbit the sun once. Neptune is about 4 times larger than the Earth and is about 17 times as massive. Neptune was discovered on September 23, 1846 based on calculations done by the French astronomer Urbain LeVerrier and the English astronomer John Adams. Neptune is also the Roman name for Poseidon, the god of the sea and earthquakes. Neptune was the son of Chronus and Rhea and carries the trident, a three pronged spear. Planetary Data Distance from Sun Length of Day Length of Year Radius Mass 30.069 AU 16.1 hours 164.79 years 24,764 km 1.02*1026 kg Known Satellites

436

Glossary Term - Beta Decay  

NLE Websites -- All DOE Office Websites (Extended Search)

Avogadro's Number Avogadro's Number Previous Term (Avogadro's Number) Glossary Main Index Next Term (Beta Particle) Beta Particle Beta Decay Beta decay results in the emission of an electron and antineutrino, or a positron and neutrino. Beta decay is one process that unstable atoms can use to become more stable. There are two types of beta decay, beta-minus and beta-plus. During beta-minus decay, a neutron in an atom's nucleus turns into a proton, an electron and an antineutrino. The electron and antineutrino fly away from the nucleus, which now has one more proton than it started with. Since an atom gains a proton during beta-minus decay, it changes from one element to another. For example, after undergoing beta-minus decay, an atom of carbon (with 6 protons) becomes an atom of nitrogen (with 7 protons).

437

Glossary Term - Electron Capture  

NLE Websites -- All DOE Office Websites (Extended Search)

Electron Electron Previous Term (Electron) Glossary Main Index Next Term (Electron Volt (eV)) Electron Volt (eV) Electron Capture After electron capture, an atom contains one less proton and one more neutron. Electron capture is one process that unstable atoms can use to become more stable. During electron capture, an electron in an atom's inner shell is drawn into the nucleus where it combines with a proton, forming a neutron and a neutrino. The neutrino is ejected from the atom's nucleus. Since an atom loses a proton during electron capture, it changes from one element to another. For example, after undergoing electron capture, an atom of carbon (with 6 protons) becomes an atom of boron (with 5 protons). Although the numbers of protons and neutrons in an atom's nucleus change

438

Glossary Term - Ceres  

NLE Websites -- All DOE Office Websites (Extended Search)

Catalyst Catalyst Previous Term (Catalyst) Glossary Main Index Next Term (Cloud Chamber) Cloud Chamber Ceres Ceres is an asteroid located between the orbits of Mars and Jupiter. Discovered on January 1, 1801 by Giuseppi Piazzi, Ceres was the first asteroid ever discovered. With a diameter of 1025 kilometers (637 miles), Ceres is also the largest known asteroid. Ceres is also the Roman name for the Greek goddess Demeter, the elder sister of Zeus and daughter of Cronus and Rhea. Demeter was the goddess of grain and helped the crops grow. One day her daughter, Persephone, was abducted by Hades. While Demeter searched for her missing daughter, no crops grew and people starved. Persephone was eventually found, but Hades refused to let her leave the underworld. As a compromise, Persephone is

439

Long Term Innovative Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE's Hydrogen and DOE's Hydrogen and Fuel Cell Technologies, Fuel Cell Presolicitation Workshop Bryan Pivovar With Input/Feedback from Rod Borup (LANL), Debbie Myers (ANL), DOE and others as noted in presentation Lakewood, CO March 16, 2010 Long Term Innovative Technologies National Renewable Energy Laboratory Innovation for Our Energy Future Innovative/Long Term and RELEVANT Mission of DOE Mission of EERE (Applied Program) Mission of HFCT To enable the widespread commercialization of hydrogen and fuel cells in diverse sectors of the economy-with emphasis on applications that will most effectively strengthen the nation's energy security and improve our stewardship of the environment-through research, development, and demonstration of critical improvements in the technologies, and through diverse activities to overcome

440

Glossary Term - Uranus  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Tritium Previous Term (Tritium) Glossary Main Index Next Term (Van de Graaff Generator) Van de Graaff Generator Uranus Uranus as seen by the Voyager II spacecraft. Uranus is the seventh planet from the sun and takes 84 years to orbit the sun once. Uranus is about 4 times larger than the Earth and is about 14.5 times as massive. Uranus was discovered on March 13, 1781 by William Herschel. In greek mythology, Uranus was Father Sky. Planetary Data Distance from Sun Length of Day Length of Year Radius Mass 19.191 AU 17.2 hours 84.01 years 25,559 km 8.68*1025 kg Known Satellites Name Distance from Uranus Rotational Period Orbital Period Radius Cordelia 49,770 km -unknown- 0.335034 days 21 km Ophelia 53,790 km -unknown- 0.376400 days 23 km Bianca 59,170 km -unknown- 0.434579 days 27 km

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Assessment of Long-Term Performance and Chromate  

E-Print Network (OSTI)

in the contaminant treatment and of the influence of the ground- water chemistry on the PRB material. Little is known S M ¨A D E R , , * M A A R T E N N A C H T E G A A L , § A N D R U B E N K R E T Z S C H M A R Rock-Water-row of cylinders filled with zerovalent iron shavings, for chromate remediation was monitored over four years

442

Predicting long-term lumen maintenance life of LED light sources using a particle filter-based prognostic approach  

Science Journals Connector (OSTI)

Abstract Lumen degradation is a common failure mode in LED light sources. Lumen maintenance life, defined as the time when the maintained percentages of the initial light output fall below a failure threshold, is a key characteristic for assessing the reliability of LED light sources. Owing to the long lifetime and high reliability of LED lights sources, it is challenging to estimate the lumen maintenance life for LED light sources using traditional life testing that records failure data. This paper describes a particle filter-based (PF-based) prognostic approach based on both Sequential Monte Carlo (SMC) and Bayesian techniques to predict the lumen maintenance life of LED light sources. The lumen maintenance degradation data collected from an accelerated degradation test was used to demonstrate the prediction algorithm and methodology of the proposed PF approach. Its feasibility and prediction accuracy were then validated and compared with the TM-21 standard method that was created by the Illuminating Engineering Society of North America (IESNA). Finally, a robustness study was also conducted to analyze the initialization of parameters impacting the prediction accuracy and the uncertainties of the proposed PF method. The results show that, compared to the TM-21 method, the PF approach achieves better prediction performance, with an error of less than 5% in predicting the long-term lumen maintenance life of LED light sources.

Jiajie Fan; Kam-Chuen Yung; Michael Pecht

2015-01-01T23:59:59.000Z

443

Is This Cost Estimate Reliable?Is This Cost Estimate Reliable? -The Relationship between Homogeneity of Analogues  

E-Print Network (OSTI)

Is This Cost Estimate Reliable?Is This Cost Estimate Reliable? - The Relationship between/4)( / ) Software cost estimation Definition · Task of predicting the cost required to complete a software projectproject Techniques for software cost estimation · Algorithmic estimationAlgorithmic estimation ­ Calculate

Bae, Doo-Hwan

444

Introducing new uncertainty theories into decision-aid methods: application to expert assessment of natural risks in  

E-Print Network (OSTI)

Introducing new uncertainty theories into decision-aid methods: application to expert assessment application cases using possibility, belief function theories and multicriteria decision making are described dam, information imperfection, reliability, expert assessment, multicriteria decision analysis, fuzzy

Paris-Sud XI, Université de

445

Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) Quality Assurance Manual  

SciTech Connect

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) is a software application developed for performing a complete probabilistic risk assessment using a personal computer running the Microsoft Windows operating system. SAPHIRE is primarily funded by the U.S. Nuclear Regulatory Commission (NRC). The role of the INL in this project is that of software developer and tester. This development takes place using formal software development procedures and is subject to quality assurance (QA) processes. The purpose of this document is to describe how the SAPHIRE software QA is performed for Version 6 and 7, what constitutes its parts, and limitations of those processes.

C. L. Smith; R. Nims; K. J. Kvarfordt; C. Wharton

2008-08-01T23:59:59.000Z

446

COMPARATIVE ASSESSMENT OF MATERIAL PERFORMANCE IN DEMO  

E-Print Network (OSTI)

for sufficient time. Reliable estimates of component lifetimes are an important part of power plant design The basic DEMO design used in the present study is a 1.8 GW device (2.2 GW total thermal power ­ including simulation models and capabilities to assess material performance under the neutron irradiation conditions

447

Comparison of methodologies estimating emissions of aircraft pollutants, environmental impact assessment around airports  

SciTech Connect

Air transportation growth has increased continuously over the years. The rise in air transport activity has been accompanied by an increase in the amount of energy used to provide air transportation services. It is also assumed to increase environmental impacts, in particular pollutant emissions. Traditionally, the environmental impacts of atmospheric emissions from aircraft have been addressed in two separate ways; aircraft pollutant emissions occurring during the landing and take-off (LTO) phase (local pollutant emissions) which is the focus of this study, and the non-LTO phase (global/regional pollutant emissions). Aircraft pollutant emissions are an important source of pollution and directly or indirectly harmfully affect human health, ecosystems and cultural heritage. There are many methods to asses pollutant emissions used by various countries. However, using different and separate methodology will cause a variation in results, some lack of information and the use of certain methods will require justification and reliability that must be demonstrated and proven. In relation to this issue, this paper presents identification, comparison and reviews of some of the methodologies of aircraft pollutant assessment from the past, present and future expectations of some studies and projects focusing on emissions factors, fuel consumption, and uncertainty. This paper also provides reliable information on the impacts of aircraft pollutant emissions in short term and long term predictions.

Kurniawan, Jermanto S., E-mail: Jermanto.kurniawan@inrets.fr; Khardi, S., E-mail: Salah.khardi@inrets.f

2011-04-15T23:59:59.000Z

448

Integrity, Reliability and Security: The Role of Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

F. Lawson F. Lawson Director, Strategic Center for Natural Gas & Oil National Energy Technology Laboratory General session Natural Gas Technologies Conference 2005 Cosponsors: NETL/Gas Technology Institute Orlando, Florida January 31, 2005 Integrity, Reliability and Security: The Role of Technology Introduction Integrity, reliability, and security encompass all the attributes we want-indeed, need-from our natural gas industry. We need integrity in physical transportation and storage systems, reliability in operating systems, and security in supplies and delivery systems. This conference is the most comprehensive forum for addressing new and evolving technologies impacting all these needs. The conference scope runs the gamut: from finding and producing to storing,

449

System reliability: An example of nuclear reactor system analysis  

Science Journals Connector (OSTI)

This paper presents an overview of the three reliability investigations of a 900 \\{MWe\\} reactor residual heat removal system. Following a description of the system and its functions, the main procedures used in operational reliability analysis, based on the analysis of occurence records, are covered. The second part of the investigations covers predicted reliability, involving the use of the Markov method. It will be noted that the two types of analysis are in good agreement, the probability of system loss after two months' operation being of the order of 10?1. Additional investigation data are also given.

R. Coudray; J.M. Mattei

1984-01-01T23:59:59.000Z

450

Physics-Based Stress Corrosion Cracking Component Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Physics-Based Stress Corrosion Physics-Based Stress Corrosion Cracking Component Reliability Model cast in an R7-Compatible Cumulative Damage Framework Draft Report Supporting Technology Inputs to the Risk- Informed Safety Margin Characterization Pathway of the DOE Light Water Reactor Sustainability Program Stephen D. Unwin Kenneth I. Johnson Robert F. Layton Peter P. Lowry Scott E. Sanborn Mychailo B. Toloczko PNNL-20596 July 2011 Physics-Based SCC Reliability Model in a Cumulative Damage Framework 2 Physics-Based SCC Reliability Model in a Cumulative Damage Framework 3 Table of Contents Executive Summary............................................................................... 4 1. Introduction .......................................................................... 5

451

A review on sensorless techniques for sustainable reliablity and efficient variable frequency drives of induction motors  

Science Journals Connector (OSTI)

Abstract Variable frequency drives (VFDs) can provide reliable dynamic systems and significant savings in energy usage and costs of the induction motors (IMs). Sensorless controlled IM drives have advantages in terms of efficiency enhancement and energy savings for critical applications such as electric vehicles, high performance machine tools, fans, compressors, etc. IM drives without having speed sensors or optical encoders mounted at the motor shaft are attractive because of their lower cost and higher reliability. When mechanical speed sensor is removed, the rotor speed information is estimated using the measured quantities of stator voltages and currents at the IM terminals. This paper highlights the sensorless techniques applied to the IM drives for sustainable reliability and energy savings. Overview on the IM mathematical model is briefly summarized to establish a physical basis for the sensorless schemes used. Further, the different types of IM-VFDs are presented in the paper. The main focus of this review is on the sensorless estimation techniques which are being applied to make IM-VFDs more effective during wide speed operations including very-high and very-low speed regions.

Ibrahim M. Alsofyani; N.R.N. Idris

2013-01-01T23:59:59.000Z

452

Installation of PV systems in Greece—Reliability improvement in the transmission and distribution system  

Science Journals Connector (OSTI)

Photovoltaic (PV) power systems are becoming one of the most developing investment areas in the field of Renewable Energy Sources (RES). A statement of the status quo of PV power systems in Greece, and their contribution towards the improvement of power system reliability, is the scope of the present paper. Siting and installation of PV power systems is performed according to a recent Greek law, along with environmental and geographical constraints. Meteorological data are computed, formulated and imported to appropriate software in order to simulate the PV units and generate their power output. Data for unserved loads, resulting from load shedding during peak hours, are compared to the above estimated power production. Assuming that a proportion of the eventually unsupplied power could be provided by the accessed power generation of the PV units, the reliability of both transmission and distribution system is improved. The impact on the transmission system is shown by an improvement of LOLP and LOEP indices, whereas peak shaving for the Interconnected Greek Transmission System (IGTS) is also illustrated. For the distribution system the impact is quantified using the distribution system reliability indices SAIDI, SAIFI, and CAIDI. Finally, the resulting improvement is also expressed in financial terms.

Aggelos S. Bouhouras; Antonios G. Marinopoulos; Dimitris P. Labridis; Petros S. Dokopoulos

2010-01-01T23:59:59.000Z

453

Multi-objective stochastic Distribution Feeder Reconfiguration from the reliability point of view  

Science Journals Connector (OSTI)

Abstract The main purpose of this paper is to assess the DFR (Distribution Feeder Reconfiguration) strategy as a costless technique to enhance the reliability of the distribution systems. The objective functions to be investigated are: SAIFI (System Average Interruption Frequency Index), AENS (Average Energy Not Supplied), total active power losses and the total network cost. In order to observe the effect of renewable energy sources on the reliability of the power system, wind power source as a popular type of renewable energy source is also considered in the system. In addition, to make the analysis more reliable, the uncertainty of the forecast error of active and reactive loads, wind speed variations as well as the failure rate and repair rate parameters are modeled though the probabilistic load flow. Since the problem investigated is a type of discrete, nonlinear and non-convex optimization problem, a novel self adaptive modified optimization algorithm based on the BA (bat algorithm) is proposed too. The proposed self adaptive modification method makes use of three sub-modifications to give each bat (solution) a choice of preferences during the optimization process. The efficiency and feasibility of the proposed method are studied through a standard IEEE (Institute of Electrical and Electronics Engineers) test system.

Abdollah Kavousi-Fard; Taher Niknam

2014-01-01T23:59:59.000Z

454

Flu Terms Defined  

NLE Websites -- All DOE Office Websites (Extended Search)

Flu Terms Defined Flu Terms Defined H1N1 Influenza is a respiratory disease of pigs caused by type A influenza viruses that causes regular outbreaks in pigs. People do not normally get H1N1 flu, but human infections can and do happen. H1N1 flu viruses have been reported to spread from person-to-person, but in the past, this transmission was limited and not sustained beyond three people. Avian flu (AI) is caused by influenza viruses that occur naturally among wild birds. Low pathogenic AI is common in birds and causes few problems. Highly pathogenic H5N1 is deadly to domestic fowl, can be transmitted from birds to humans, and is deadly to humans. There is virtually no human immunity and human vaccine availability is very limited. Pandemic flu is virulent human flu that causes a global outbreak, or pandemic, of serious illness. Because there is little natural immunity, the disease can spread easily from person to person. Currently, there is no pandemic flu.

455

Last Update: 5-14-12 Assessment Competency Evaluation Form  

E-Print Network (OSTI)

Competency Criteria ____ A. Student understands and is able to articulate the referral question (e to the client. ____ C. Student selects assessment methods appropriate for the referral question and client (e to the referral question and the client assessed (e.g., the measures used are reliable and valid for the purposes

Gelfond, Michael

456

The Office of Electricity Delivery and Energy Reliability is Closely  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Office of Electricity Delivery and Energy Reliability is The Office of Electricity Delivery and Energy Reliability is Closely Monitoring Hurricane Irene (2011) The Office of Electricity Delivery and Energy Reliability is Closely Monitoring Hurricane Irene (2011) August 25, 2011 - 11:13am Addthis The Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability (OE) is closely monitoring Hurricane Irene as it travels up the U.S. coast and is publishing Situation Reports. Addthis Related Articles Sandy made landfall as a post-tropical cyclone on the southern coast of New Jersey near Atlantic City at 8 p.m. on October 29, with top sustained winds of 80 mph. | Photo courtesy of NOAA. Responding To Hurricane Sandy: DOE Situation Reports On November 7, a Nor'easter began to impact the Mid-Atlantic and Northeast with strong winds, rain or snow, and coastal flooding. | Photo courtesy of NOAA.

457

Effect of Heat and Electricity Storage and Reliability on Microgrid  

NLE Websites -- All DOE Office Websites (Extended Search)

Effect of Heat and Electricity Storage and Reliability on Microgrid Effect of Heat and Electricity Storage and Reliability on Microgrid Viability: A Study of Commercial Buildings in California and New York States Title Effect of Heat and Electricity Storage and Reliability on Microgrid Viability: A Study of Commercial Buildings in California and New York States Publication Type Report Year of Publication 2009 Authors Stadler, Michael, Chris Marnay, Afzal S. Siddiqui, Judy Lai, Brian Coffey, and Hirohisa Aki Pagination 106 Date Published 03/2006 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), energy analysis and environmental impacts department Abstract Berkeley Lab has for several years been developing methods for selection of optimal microgrid systems, especially for commercial building applications, and applying these methods in the Distributed Energy Resources Customer Adoption Model (DER-CAM). This project began with 3 major goals:

458

HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear  

National Nuclear Security Administration (NNSA)

HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear Security Summit: Fact Sheet | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Fact Sheets > HEU Minimization and the Reliable Supply of ... Fact Sheet HEU Minimization and the Reliable Supply of Medical Isotopes Nuclear

459

Assistant Secretary Patricia Hoffman's Remarks at the 2011 FERC Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assistant Secretary Patricia Hoffman's Remarks at the 2011 FERC Assistant Secretary Patricia Hoffman's Remarks at the 2011 FERC Reliability Technical Conference -- As Prepared for Delivery Assistant Secretary Patricia Hoffman's Remarks at the 2011 FERC Reliability Technical Conference -- As Prepared for Delivery November 30, 2011 - 1:42pm Addthis Thank you for the opportunity to join you today. Everyone in this room shares a commitment to ensuring the reliability of our nation's electric grid. Together, we are committed to ensuring the safe and secure delivery of electricity to consumers. And, together, we share a commitment to doing this in a way that is economically viable, affordable, protects public health, and is environmentally sound. Historically, the electric utility sector has a strong track record of protecting the reliability of our Nation's electric grid. Working

460

The Relationship between Competitive Power Markets and Grid Reliability. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Relationship between Competitive Power Markets and Grid The Relationship between Competitive Power Markets and Grid Reliability. The Relationship between Competitive Power Markets and Grid Reliability. The U.S. Department of Energy and Natural Resources Canada should commission an independent study of the relationships among industry restructuring, competition in power markets, and grid reliability, and how those relationships should be managed to best serve the public interest. The Relationship between Competitive Power Markets and Grid Reliability. More Documents & Publications Blackout 2003: Blackout Final Implementation Report U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations Blackout 2003: Final Report on the August 14, 2003 Blackout in the United

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Request for Information: Photovoltaic Reliability and Durability Research and Development  

Energy.gov (U.S. Department of Energy (DOE))

The United States Department of Energy (DOE) – Office of Energy Efficiency and Renewable Energy (EERE) seeks feedback from industry, academia, research laboratories, government agencies, and other stakeholders on issues related to solar photovoltaic (PV) reliability and durability research and development.

462

Enhanced Reliability of Photovoltaic Systems with Energy Storage and Controls  

SciTech Connect

This report summarizes efforts to reconfigure loads during outages to allow individual customers the opportunity to enhance the reliability of their electric service through the management of their loads, photovoltaics, and energy storage devices.

Manz, D.; Schelenz, O.; Chandra, R.; Bose, S.; de Rooij, M.; Bebic, J.

2008-02-01T23:59:59.000Z

463

A Monte Carlo tool for multi-node reliability evaluation  

E-Print Network (OSTI)

-Area Reliability Program(NARP) is based on the random sampling of generator and transmission line status for each hour. Monte Carlo Approach for Estimating Contingency Statistics along with the Evaluation Subroutine(MACS-ES) advances the generation...

Thalasila, Chander Pravin

2012-06-07T23:59:59.000Z

464

Reliability of the spark inspection of cable product insulation  

Science Journals Connector (OSTI)

The types of manufacturing flaws in cable products and the causes of their occurrence were studied. Methods for improving the reliability of the detection of flaws and the classification of flaws that are dete...

V. V. Red’ko; L. B. Burtseva; L. A. Red’ko

2011-10-01T23:59:59.000Z

465

SOFTWARE TESTING, VERIFICATION AND RELIABILITY Softw. Test. Verif. Reliab. (2014)  

E-Print Network (OSTI)

. An industrial case study using reactor protection system software shows that the automatically generated test defined by the International Electrotechnical Commission (IEC). Industrial FBD testing relies mostlySOFTWARE TESTING, VERIFICATION AND RELIABILITY Softw. Test. Verif. Reliab. (2014) Published online

466

Office of Electricity Delivery and Energy Reliability, OE-20  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2012 Office of Electricity Delivery and Energy Reliability, OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, DC 20585 RE: Comments for Consideration in...

467

Lamont Jackson Office of Electricity Delivery and Energy Reliability  

Energy Savers (EERE)

March 28, 2012 Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue, S.W. Washington, D.C....

468

Lamont Jackson Office of Electricity Delivery and Energy Reliability  

Energy Savers (EERE)

March 28, 2012 Lamont Jackson Office of Electricity Delivery and Energy Reliability Mail Code: OE-20 U.S. Department of Energy 1000 Independence Avenue SW Washington, D.C. 20585...

469

Reliability-based Design of Offshore Mooring Systems  

E-Print Network (OSTI)

This study proposes new methods for the reliability-based design of structural systems, with emphasis on offshore mooring systems. After a brief introduction to the mooring systems, two main objectives are discussed in this dissertation. The first...

Mousavi, Mir Emad

2013-02-05T23:59:59.000Z

470

On Optimization of Reliability of Distributed Generation-Enhanced Feeders  

Science Journals Connector (OSTI)

Placement of protection devices in a conventionalfeeder (without distributed generation) is often performedso as to minimize traditional reliability indices (SAIDI,SAIFI, MAIFIe...), assuming the sole source(s) of energyat substation(s). Distributed ...

A. Pregelj; M. Begovic; A. Rohatgi; D. Novosel

2003-01-01T23:59:59.000Z

471

Complex Technical Systems Operation, Reliability, Availability, Safety and Cost Optimization  

Science Journals Connector (OSTI)

The methods based on the results of the joint model linking a semi-Markov modeling of the system operation processes with a multistate approach to system reliability and safety and the linear programming are prop...

Krzysztof Ko?owrocki; Joanna Soszy?ska-Budny

2011-01-01T23:59:59.000Z

472

Office of Electricity Delivery And Energy Reliability To Hold Technical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery And Energy Reliability To Hold Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission February 5, 2009 - 10:57am Addthis On March 4, 2009, the Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) will conduct a technical conference in the Washington, DC area to discuss the design of future electric transmission. The technical conference will discuss the likely demand for future electric transmission and whether the development of conceptual alternative extra high voltage (EHV) systems would assist generation developers, State energy policy officials, utility planners, and other

473

Persistent Nodes for Reliable Memory in Geographically Local Networks  

E-Print Network (OSTI)

A Persistent Node is a redundant distributed mechanism for storing a key/value pair reliably in a geographically local network. In this paper, I develop a method of establishing Persistent Nodes in an amorphous matrix. I ...

Beal, Jacob

2003-04-15T23:59:59.000Z

474

Renewable Energy Specifications, Testing and Certification Terms of  

Open Energy Info (EERE)

Renewable Energy Specifications, Testing and Certification Terms of Renewable Energy Specifications, Testing and Certification Terms of Reference Jump to: navigation, search Tool Summary Name: Renewable Energy Specifications, Testing and Certification Terms of Reference Agency/Company /Organization: World Bank Sector: Energy Focus Area: Solar, - Solar PV Topics: Market analysis, Co-benefits assessment Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, References: Renewable Energy Specifications, Testing and Certification Terms of Reference[1] Resources Establishment of Local PV Systems Certification Capability Preparation of Small Private Power Producers Grid Connection Standards Establishment of Local PV System Battery Testing Procedure References ↑ "Renewable Energy Specifications, Testing and Certification

475

Improved load models for multi-area reliability calculations  

E-Print Network (OSTI)

IMPROVED LOAD MODELS FOR MULTI-AREA RELIABILITY CALCULATIONS A Thesis by SANJESH PATHAK Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May... 1992 Major Subject: Electrical Engineering IMPROVED LOAD MODELS FOR MULTI-AREA RELIABILITY CALCULATIONS A Thesis by SAN JESH PATHAK Approved as to style and content by: Chanan Singh (Chair of Committee) Prasad Enjeti (Member) Ces . Mal, e...

Pathak, Sanjesh

1992-01-01T23:59:59.000Z

476

Wind Farm Diversification and Its Impact on Power System Reliability  

E-Print Network (OSTI)

WIND FARM DIVERSIFICATION AND ITS IMPACT ON POWER SYSTEM RELIABILITY A Thesis by YANNICK DEGEILH Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree... of MASTER OF SCIENCE August 2009 Major Subject: Electrical Engineering WIND FARM DIVERSIFICATION AND ITS IMPACT ON POWER SYSTEM RELIABILITY A Thesis by YANNICK DEGEILH Submitted to the Office of Graduate Studies of Texas A...

Degeilh, Yannick

2010-10-12T23:59:59.000Z

477

A hypothetical profile of ordinary steam turbines with reduced cost and enhanced reliability for contemporary conditions  

SciTech Connect

Power steam turbines should be characterized with the reduced cost and enhanced reliability and designed on the basis of experience in steam turbine design and operation accumulated in the world`s practice for the latest years. Currently, such turbines have to be particularly matched with requirements of operation for deregulated power systems; so they should be capable of operating in both base-load and cycling modes. It seems reasonable to have such turbines with the single capacity about 250--400 MW, supercritical main steam pressure, and single steam reheat. This makes it possible to design such turbines with the minimum specific metal amount and length, with the integrated HP-IP and one two-flow LP cylinders. With existing ferritic and martensitic-class steels, the main and reheat steam temperatures can be chosen at the level of 565--580 C (1050--1075 F) without remarkable supplemental expenditures and a sacrifice of reliability. To reduce the capital cost and simplify operation and maintenance, the turbine`s regenerative system can be designed deaeratorless with motor-driven boiler-feed pumps. Such turbines could be used to replace existing old turbines with minimum expenditures. They can also be combined with large high-temperature gas-turbine sets to shape highly efficient combined-cycle units. There exist various design and technological decisions to enhance the turbine reliability and efficiency; they are well worked up and verified in long-term operation practice of different countries. For reliable and efficient operation, the turbine should be furnished with advanced automatic and automated control, diagnostic monitoring, and informative support for the operational personnel.

Leyzerovich, A.S. [Actinium Corp., St. Louis, MO (United States)

1998-12-31T23:59:59.000Z

478

Real-Time Grid Reliability Management PIER Final Project Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Real-Time Grid Reliability Management PIER Final Project Report Real-Time Grid Reliability Management PIER Final Project Report Title Real-Time Grid Reliability Management PIER Final Project Report Publication Type Report Year of Publication 2008 Authors Eto, Joseph H., Manu Parashar, Bernard C. Lesieutre, and Nancy J. Lewis Pagination 62 Date Published 12/2008 Publisher LBNL City Berkeley Keywords consortium for electric reliability technology solutions (certs), energy analysis and environmental impacts department Abstract The increased need to manage California's electricity grid in real time is a result of the ongoing transition from a system operated by vertically integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management - construction of new transmission lines - has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools.

479

Final Report for the Virtual Reliability Realization System LDRD  

SciTech Connect

Current approaches to reliability are not adequate to keep pace with the need for faster, better and cheaper products and systems. This is especially true in high consequence of failure applications. The original proposal for the LDRD was to look at this challenge and see if there was a new paradigm that could make reliability predictions, along with a quantitative estimate of the risk in that prediction, in a way that was faster, better and cheaper. Such an approach would be based on the underlying science models that are the backbone of reliability predictions. The new paradigm would be implemented in two software tools: the Virtual Reliability Realization System (VRRS) and the Reliability Expert System (REX). The three-year LDRD was funded at a reduced level for the first year ($120K vs. $250K) and not renewed. Because of the reduced funding, we concentrated on the initial development of the expertise system. We developed an interactive semiconductor calculation tool needed for reliability analyses. We also were able to generate a basic functional system using Microsoft Siteserver Commerce Edition and Microsoft Sequel Server. The base system has the capability to store Office documents from multiple authors, and has the ability to track and charge for usage. The full outline of the knowledge model has been incorporated as well as examples of various types of content.

DELLIN, THEODORE A.; HENDERSON, CHRISTOPHER L.; O'TOOLE, EDWARD J.

2000-12-01T23:59:59.000Z

480

Environmental Assessments (EA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2, 2010 August 2, 2010 EA-1729: Final Environmental Assessment Removal Actions At The Technical Area III Classified Waste Landfill, Sandia National Laboratories, New Mexico July 1, 2010 EA-1743: Final Environmental Assessment Air Products And Chemicals, Inc. Waste Energy Project at the AK Steel Corporation Middletown Works, Middletown, Ohio July 1, 2010 EA-1740: Final Environmental Assessment Thermal Energy Corporation Combined Heat And Power Project, Houston, Texas July 1, 2010 EA-1698: Final Environmental Assessment Baldwin Wind Energy Center July 1, 2010 EA-1696: Final Environmental Assessment Pantex Renewable Energy Project June 25, 2010 EA-1801: Final Environmental Impact Granite Reliable Power Wind Project, Coos County, New Hampshire June 16, 2010 EA-1741: Draft Environmental Assessment

Note: This page contains sample records for the topic "term reliability assessment" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Consequence Assessment  

Directives, Delegations, and Requirements

This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

482

The Centralized Reliability Data Organization (CREDO); an Advanced Nuclear Reactor Reliability, Availability, and Maintainability Data Bank and Data Analysis Center  

Science Journals Connector (OSTI)

The Centralized Reliability Data Organization (CREDO) is a data bank and data analysis center, which since 1985 has been jointly ... of Technology Support Programs and Japan’s Power Reactor and Nuclear Fuel Devel...

H. E. Knee

1991-01-01T23:59:59.000Z

483

CRAD, Maintenance Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

484

Vulnerability Assessment Team (VAT) - Nuclear Engineering Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Vulnerability Assessment Team Vulnerability Assessment Team VAT Projects Introducing the VAT Adversarial Vulnerability Assessments Safety Tags & Product Counterfeiting Election Security Spoofing GPS Defeating Existing Tamper-Indicating Seals Specialty Field Tools & Sampling Tools Insider Threat Mitigation Drug Testing Security Microprocessor Prototypes The Journal of Physical Security Vulnerability Assessments Vulnerability Assessments Insanely Fast µProcessor Shop Insanely Fast µProcessor Shop Seals About Seals Applications of Seals Common Myths about Tamper Indicating Seals Definitions Findings and Lessons Learned New Seals Types of Seals Seals References Selected VAT Papers Selected VAT Papers Selected Invited Talks Self-Assessment Survey Security Maxims Devil's Dictionary of Security Terms

485

Progress in evaluation and improvement in nondestructive examination reliability for inservice inspection of Light Water Reactors (LWRs) and characterize fabrication flaws in reactor pressure vessels  

SciTech Connect

This paper is a review of the work conducted under two programs. One (NDE Reliability Program) is a multi-year program addressing the reliability of nondestructive evaluation (NDE) for the inservice inspection (ISI) of light water reactor components. This program examines the reliability of current NDE, the effectiveness of evolving technologies, and provides assessments and recommendations to ensure that the NDE is applied at the right time, in the right place with sufficient effectiveness that defects of importance to structural integrity will be reliably detected and accurately characterized. The second program (Characterizing Fabrication Flaws in Reactor Pressure Vessels) is assembling a data base to quantify the distribution of fabrication flaws that exist in US nuclear reactor pressure vessels with respect to density, size, type, and location. These programs will be discussed as two separate sections in this report. 4 refs., 7 figs.

Doctor, S.R.; Bowey, R.E.; Good, M.S.; Friley, J.R.; Kurtz, R.J.; Simonen, F.A.; Taylor, T.T.; Heasler, P.G.; Andersen, E.S.; Diaz, A.A.; Greenwood, M.S.; Hockey, R.L.; Schuster, G.J.; Spanner, J.C.; Vo, T.V.

1991-10-01T23:59:59.000Z

486

Assessing Reliability in Transportation Energy Supply Pathways: A Hydrogen Case Study  

E-Print Network (OSTI)

Asia Liquefied natural gas (LNG) imports are projected tosector, but increasing LNG imports worldwide add relevanceliquefied natural gas (LNG). The LNG supplies were specified

McCarthy, Ryan; Ogden, Joan M

2005-01-01T23:59:59.000Z

487

Assessing reliability of protein-protein interactions by integrative analysis of data in model organisms  

E-Print Network (OSTI)

Background: Protein-protein interactions play vital roles in nearly all cellular processes and are involved in the construction of biological pathways such as metabolic and signal transduction pathways. Although large-scale ...

Lin, Xiaotong; Liu, Mei; Chen, Xue-wen

2009-04-29T23:59:59.000Z

488

Assessment of Lifetime Cumulative Sun Exposure Using a Self-Administered Questionnaire: Reliability of Two Approaches  

Science Journals Connector (OSTI)

...latitude influences outdoor temperatures, which to some extent, determines...Analysis Cumulative lifetime sun exposure during 9:00 a...averaged to give the rate of sun exposure (i.e., average...categories would have a similar distribution to the time-based response...

Chu-Ling Yu; Yan Li; D. Michal Freedman; Thomas R. Fears; Richard Kwok; Gabriel Chodick; Bruce Alexander; Michael G. Kimlin; Anne Kricker; Bruce K. Armstrong; and Martha S. Linet

2009-02-01T23:59:59.000Z

489

Assessing Reliability in Transportation Energy Supply Pathways: A Hydrogen Case Study  

E-Print Network (OSTI)

and 2) on-site electrolysis of water using electricitypoints of end use via electrolysis of water, so no transport

McCarthy, Ryan W.; Ogden, J

2005-01-01T23:59:59.000Z

490

Electrochemical characterization and time-variant structural reliability assessment of post-tensioned, segmental concrete bridges  

E-Print Network (OSTI)

on PT bridges have reported the presence of voids, moisture, and chlorides inside grouted ducts as the major cause of accelerated corrosion of strands. Corrosion of the strands has resulted in PT bridge failures in Europe and tendon failures...

Pillai Gopalakrishnan, Radhakris

2010-07-14T23:59:59.000Z

491

A Reliability Assessment Paradigm for Automated Video Tracking Systems Chung-Hao Chen, 2  

E-Print Network (OSTI)

concentrate on defining separate metrics over a wide range of conditions and generating standard benchmarking such as changing weather conditions, changing number of objects to be tracked, changing illuminations, etc. Thus on comparisons with ground truth can be further classified according to the type of metrics they use [7, 8, 9

Abidi, Mongi A.

492

A Methodology to Assess the Reliability of Hydrogen-based Transportation Energy Systems  

E-Print Network (OSTI)

OPEC members, Qatar suffers from economic dependence on oilQatar is more influential in the natural gas market than the oil

McCarthy, Ryan

2004-01-01T23:59:59.000Z

493

Reliability assessment in active distribution networks with detailed effects of PV systems  

Science Journals Connector (OSTI)

A micro-grid is a cluster of distributed generators and...2]. The micro-grids are typically designed for bi-mode of ... operating in the grid connected mode, the micro-grid interchangeably imports and exports pow...

Zulu ESAU; Dilan JAYAWEERA

2014-03-01T23:59:59.000Z

494

E-Print Network 3.0 - assessing household solid Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

of Groundwater Contamination from Household Wastewater... 12;Glossary Household Wastewater Treatment These terms may help you make more accurate assessments......

495

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges  

E-Print Network (OSTI)

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges H, USA Keywords: steel bridges, structural reliability, fatigue, optimal inspection, fracture, plate girder, box girder ABSTRACT: A reliability-based method for inspection scheduling of steel bridges

Manuel, Lance

496

Targeted Testing for Reliability Validation Prabhu Soundappan Efstratios Nikolaidis Balaji Dheenadayalan  

E-Print Network (OSTI)

Targeted Testing for Reliability Validation Prabhu Soundappan Efstratios Nikolaidis Balaji, OH 43606 ABSTRACT Methods for designing targeted tests for reliability validation of structures obtained from reliability-based design are presented. These methods optimize the test parameters

Nikolaidis, Efstratios

497

Uncovering the Distribution of Motorists' Preferences for Travel Time and Reliability: Implications for Road Pricing  

E-Print Network (OSTI)

estimate distributions of the values of time and reliabilityDISTRIBUTION OF MOTORISTS' PREFERENCES FOR TRAVEL TIME AND RELIABILITY:and reliability, we maintain that they consider both the central tendency and the dispersion of that distribution.

Small, Kenneth A; Winston, Clifford; Yan, Jia

2002-01-01T23:59:59.000Z

498

Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 DOE/EA-1791 FINAL ENVIRONMENTAL ASSESSMENT FOR THE UNVIERSITY OF MINNESOTA WIND ENERGY RESEARCH CONSORTIUM PROJECT ROSEMOUNT, MINNESOTA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office MARCH 2011 U.S. Department of Energy University of Minnesota Wind Energy Research Consortium Project Golden Field Office Environmental Assessment March 2011 Page i Table of Contents 1.0 Introduction .......................................................................................................................................... 1

499

ENVIRONMENTAL ASSESSMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Construction and Operation of a Proposed Biogas Anaerobic Digestion Facility at an Ethanol Plant Western Plains Energy, LLC Grinnell Township (Oakley), Gove County, Kansas U. S. Department of Agriculture Rural Business Cooperative Service 1400 Independence Avenue, SW Washington, DC 20250-3225 August 29, 2011 Environmental Assessment Western Plains Energy, LLC Gove County, Kansas ii TABLE OF CONTENTS Section Page I. PROPOSAL DESCRIPTION AND NEED .................................................................... 1 II. PRIMARY BENEFICIARIES AND RELATED ACTIVITIES .................................. 2 III. DESCRIPTION OF THE PROPOSAL AREA .............................................................. 2

500

Reliability analysis for Atucha II reactor protection system signals  

Science Journals Connector (OSTI)

Atucha II is a 745 MW Argentine Power Nuclear Reactor constructed by ENACE SA, Nuclear Argentine Company for Electrical Power Generation and SIEMENS AG KWU, Erlangen, Germany. A preliminary modular logic analysis of RPS (Reactor Protection System) signals was performed by means of the well known Swedish professional risk and reliability software named Risk-Spectrum taking as a basis a reference signal coded as JR17ER003 which command the two moderator loops valves. From the reliability and behavior knowledge for this reference signal folloos an estimation of the reliability for the other 97 RPS signals. Because the preliminary character of this analysis Main Important Measures are not performed at this stage. Reliability is by the statistic value named unavailability predicted. The scope of this analysis is restricted from the measurement elements to the RPS buffer outputs. In the present context only one redundancy is analyzed so in the Instrumentation and Control area there no CCF (Common Cause Failures) present for signals. Finally those unavailability values could be introduced in the failure domain for the posterior complete Atucha II reliability analysis which includes all mechanical and electromechanical features. Also an estimation of the spurious frequency of RPS signals defined as faulty by no trip is performed.

Jose Luis Roca