National Library of Energy BETA

Sample records for temporary restraining order

  1. EA-318-B Clarification of Temporary Emergency Order for AEP Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AEP Energy Partners, Inc. Emergency Temporary Order authorizing AEP Energy Partners to export electric energy to Mexico. PDF icon EA-318-B-ClarificationofEmergencyOrder.pdf More...

  2. EA-318-B Clarification of Temporary Emergency Order for AEP Energy

    Energy Savers [EERE]

    Partners, Inc. | Department of Energy Clarification of Temporary Emergency Order for AEP Energy Partners, Inc. EA-318-B Clarification of Temporary Emergency Order for AEP Energy Partners, Inc. Emergency Temporary Order authorizing AEP Energy Partners to export electric energy to Mexico. PDF icon EA-318-B-ClarificationofEmergencyOrder.pdf More Documents & Publications EA-318-B Emergency Order issued to AEP Energy Partners Inc Application to Export Electric Energy OE Docket No. EA-318-B

  3. Temporary Appointments

    Broader source: Energy.gov [DOE]

    A temporary appointment is a non-permanent time limited appointment for a period of 1 year. It can be extended up to the maximum of one year (total 24 months). After the first year, the...

  4. Apparatus for restraining and transporting dies

    DOE Patents [OSTI]

    Allison, James W. (Monroeville, PA); LaBarre, Timothy L. (Pittsburgh, PA)

    1994-01-01

    Apparatus for restraining and transporting dies in punch press operations is provided. A floatation platen for supporting a die on the platen's upper surface has a plurality of recessed gas exhaust ports on the platen's lower surface. A source of pressurized gas delivers gas to a platen manifold, for delivery to orifices located in the gas exhaust ports. The flow of gas is controlled by a first valve adjacent the gas source and a second valve adjacent the manifold, with the second valve being used to control the gas flow during movement of the die. In this fashion, a die may be moved on a cushion of air from one workstation to a selected second workstation. A moveable hydraulically operated restraining fixture is also provided, for clamping the die in position during the compacting phase, and for releasing the die after completion of the compacting phase by releasing the hydraulic pressure on the restraining fixture. When pressure in the hydraulic cylinders on the restraining fixture is reversed, the restraining fixture will retract so that there is no contact between the die and the restraining fixture, thereby allowing the die to be removed from a first workstation and moved to a second selected workstation.

  5. The Effect of Diesel Fuel Properties on Emissions-Restrained...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Effect of Diesel Fuel Properties on Emissions-Restrained Fuel Economy at Mid-Load Conditions The Effect of Diesel Fuel Properties on Emissions-Restrained Fuel Economy at...

  6. EA-284-A Sempra Energy Solutions: Temporary Extension | Department of

    Energy Savers [EERE]

    Energy A Sempra Energy Solutions: Temporary Extension EA-284-A Sempra Energy Solutions: Temporary Extension Temporary extension of order authorizing Sempra Energy Solutions to export electric energy to mexico. PDF icon EA-284-A Sempra Energy Solutions More Documents & Publications EA-284-A Sempra Energy Solutions EA-406 Sempra Generation, LLC EA-284-C NOBLE AMERICAS ENERGY SOLUTIONS LLC

  7. Salt restrains maturation in subsalt plays

    SciTech Connect (OSTI)

    Mello, U.T. ); Anderson, R.N.; Karner, G.D. . Lamont-Doherty Earth Observatory)

    1994-01-31

    The thermal positive anomaly associated with the top of salt diapirs has attracted significant attention in modifying the temperature structure and history of a sedimentary basin. Here the authors explore the role of the negative thermal anomaly beneath salt in modifying the maturation history of the source rocks in subsalt sediments. Organic matter maturation is believed to follow temperature dependent chemical reactions. Therefore, any temperature anomaly associated with salt masses affects the nearby maturation of potential source rocks. The level of maturity of source rocks close to salt diapirs will differ from that predicted based on regional trends. The impact of the thermal anomaly on a given point will depend on the duration and distance of the thermal anomaly to this particular point. Consequently, the maturation history of source rocks in salt basins is closely related to the salt motion history, implying that a transient thermal analysis is necessary to evaluate the sure impact on maturation of the thermal anomalies associated with salt diapirism. The paper describes vitrinite kinetics, salt in evolving basins, correlation of salt and temperature, salt dome heat drains, and restrained maturation.

  8. ORDER

    Energy Savers [EERE]

    PP&L EnergyPlus Company Order No. EA-210 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 4, 1999, PP&L EnergyPlus Company (PP&L EnergyPlus) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. PP&L EnergyPlus, a limited

  9. Benefits Summary - Temporary Job Classification | Argonne National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Temporary Job Classification Download a summary of benefits offered to employees in the temporary job classification (at least 6 months term and 20 hoursweek). PDF icon 2015 Long...

  10. The Effect of Diesel Fuel Properties on Emissions-Restrained Fuel Economy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Mid-Load Conditions | Department of Energy The Effect of Diesel Fuel Properties on Emissions-Restrained Fuel Economy at Mid-Load Conditions The Effect of Diesel Fuel Properties on Emissions-Restrained Fuel Economy at Mid-Load Conditions Statistical models developed from designed esperiments (varying fuel properties and engine control parameters) were used to optimize fuel consumption subject to emissions and engine performance constraints. PDF icon deer08_kumar.pdf More Documents &

  11. Student Temporary Employment Program | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Federal Employment / Our Jobs / Opportunities for Students / Student Temporary Employment Program Student Temporary Employment Program The Student Temporary Employment Program (STEP) is the perfect work-study combination for high school through graduate school students. Opportunities range from full-time summer employment to positions that can last for as long as you are a student. You might work part-time when school is in session and full-time during semester and summer

  12. Student Temporary Employment Program | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Student Jobs / Student Temporary Employment Program Student Temporary Employment Program Our Student Temporary Employment Program (STEP) positions are located nationwide. Most of our STEP positions are for summer employment. For STEP eligibility you must be: * a United States citizen; * at least 16 years old; * pursuing a high school diploma or General Equivalency Diploma (GED), vocational/technical certificate, or a college degree; * taking a half-time academic course load; *

  13. Memorandum, Interim Procedures During Temporary Suspension of...

    Broader source: Energy.gov (indexed) [DOE]

    hiring, credentialing and eligibility determinations during the period of e-QIP suspension. Memorandum, Interim Procedures During Temporary Suspension of Electronic...

  14. Temporary EPA ID Number Request | Open Energy Information

    Open Energy Info (EERE)

    Temporary EPA ID Number RequestLegal Abstract A developer that may "generate hazardous waste only from an episodic event" may instead apply for a temporary hazardous waste...

  15. ARM - Field Campaign - MWR Temporary Sites

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsMWR Temporary Sites ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : MWR Temporary Sites 1999.01.01 - 1999.10.01 Lead Scientist : Victor Morris For data sets, see below. Abstract The MWR was installed at two temporary locations in Atqasuk prior to its final installation in October 1999. Campaign Data Sets IOP Participant Data Source Description Final Data Morris MWR

  16. Chapter_2_Limited_Areas_Vault-Type_Rooms_and_Temporary_Limited_Areas

    Office of Environmental Management (EM)

    Limited Areas, VTRs, and Temporary Limited Areas Chapter 2 describes the security procedures adopted by DOE HQ to implement the requirements of the following DOE directives: * DOE Order 473.3, Protection Program Operations * DOE Order 471.6, Change 1, Information Security * DOE Order 475.2A, Identifying Classified Information * Classification Bulletin TNP-32, Classification Guidance for Classified Meeting Locations at DOE/NNSA or DOE/NNSA Contractor Sites or Facilities, dated May 27, 2010 DOE

  17. Self-degradable Temporary Cementitious | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    degradable Temporary Cementitious Self-degradable Temporary Cementitious Self-degradable Temporary Cementitious presentation at the April 2013 peer review meeting held in Denver, Colorado. PDF icon self_degradable_sealers_peer2013.pdf More Documents & Publications track 3: enhanced geothermal systems (EGS) | geothermal 2015 peer review Geopolymer Sealing Materials Multifunctional Corrosion-resistant Foamed Well Cement Composites

  18. Colorado State Board of Land Commissioners: Temporary Access...

    Open Energy Info (EERE)

    Colorado State Board of Land Commissioners: Temporary Access Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit...

  19. Temporary fire sealing of penetrations on TFTR

    SciTech Connect (OSTI)

    Hondorp, H.L.

    1981-02-01

    The radiation shielding provided for TFTR for D-D and D-T operation will be penetrated by numerous electrical and mechanical services. Eventually, these penetrations will have to be sealed to provide the required fire resistance, tritium sealability, pressure integrity and radiation attenuation. For the initial hydrogen operation, however, fire sealing of the penetrations in the walls and floor is the primary concern. This report provides a discussion of the required and desirable properties of a temporary seal which can be used to seal these penetrations for the hydrogen operation and then subsequently be removed and replaced as required for the D-D and D-T operations. Several candidate designs are discussed and evaluated and recommendations are made for specific applications.

  20. Temporary Cementitious Sealers in Enhanced Geothermal Systems

    SciTech Connect (OSTI)

    Sugama T.; Pyatina, T.; Butcher, T.; Brothers, L.; Bour, D.

    2011-12-31

    Unlike conventional hydrothennal geothermal technology that utilizes hot water as the energy conversion resources tapped from natural hydrothermal reservoir located at {approx}10 km below the ground surface, Enhanced Geothermal System (EGS) must create a hydrothermal reservoir in a hot rock stratum at temperatures {ge}200 C, present in {approx}5 km deep underground by employing hydraulic fracturing. This is the process of initiating and propagating a fracture as well as opening pre-existing fractures in a rock layer. In this operation, a considerable attention is paid to the pre-existing fractures and pressure-generated ones made in the underground foundation during drilling and logging. These fractures in terms of lost circulation zones often cause the wastage of a substantial amount of the circulated water-based drilling fluid or mud. Thus, such lost circulation zones must be plugged by sealing materials, so that the drilling operation can resume and continue. Next, one important consideration is the fact that the sealers must be disintegrated by highly pressured water to reopen the plugged fractures and to promote the propagation of reopened fractures. In response to this need, the objective of this phase I project in FYs 2009-2011 was to develop temporary cementitious fracture sealing materials possessing self-degradable properties generating when {ge} 200 C-heated scalers came in contact with water. At BNL, we formulated two types of non-Portland cementitious systems using inexpensive industrial by-products with pozzolanic properties, such as granulated blast-furnace slag from the steel industries, and fly ashes from coal-combustion power plants. These byproducts were activated by sodium silicate to initiate their pozzolanic reactions, and to create a cemetitious structure. One developed system was sodium silicate alkali-activated slag/Class C fly ash (AASC); the other was sodium silicate alkali-activated slag/Class F fly ash (AASF) as the binder of temper-try sealers. Two specific additives without sodium silicate as alkaline additive were developed in this project: One additive was the sodium carboxymethyl cellulose (CMC) as self-degradation promoting additive; the other was the hard-burned magnesium oxide (MgO) made from calcinating at 1,000-1,500 C as an expansive additive. The AASC and AASF cementitious sealers made by incorporating an appropriate amount of these additives met the following six criteria: 1) One dry mix component product; 2) plastic viscosity, 20 to 70 cp at 300 rpm; 3) maintenance of pumpability for at least 1 hour at 85 C; 4) compressive strength >2000 psi; 5) self-degradable by injection with water at a certain pressure; and 6) expandable and swelling properties; {ge}0.5% of total volume of the sealer.

  1. File:Temporary storage plan review check list.pdf | Open Energy...

    Open Energy Info (EERE)

    Temporary storage plan review check list.pdf Jump to: navigation, search File File history File usage File:Temporary storage plan review check list.pdf Size of this preview: 463 ...

  2. Proliferation of Estrogen Receptor alpha Positive Mammary Epithelial Cells is Restrained by TGFbeta1 in Adult Mice

    SciTech Connect (OSTI)

    Ewan, Kenneth B.R.; Oketch-Rabah, Hellen A.; Ravani, Shraddha A.; Shyamala, G.; Moses, Harold L.; Barcellos-Hoff, Mary Helen

    2005-03-03

    Transforming growth factor {beta}1 (TGF{beta}1) is a potent inhibitor of mammary epithelial proliferation. In human breast, estrogen receptor {alpha} (ER{alpha}) cells rarely co-localize with markers of proliferation, but their increased frequency correlates with breast cancer risk. To determine whether TGF{beta}1 is necessary for the quiescence of ER{alpha}-positive population, we examined mouse mammary epithelial gland at estrus. Approximately 35% of cells showed TGF{beta}1 activation, which co-localized with nuclear receptor-phosphorylated Smad 2/3, indicating that TGF{beta} signaling is autocrine. Furthermore, nuclear Smad co-localized with nuclear ER{alpha}. To test whether TGF{beta} was functional, we examined genetically engineered mice with different levels of TGF{beta}1. ER{alpha} co-localization with markers of proliferation (i.e. Ki-67 or BrdU) at estrus was significantly increased in the mammary glands of Tgf{beta}1 C57/bl/129SV heterozygote mice. This relationship was maintained following pregnancy, but was absent at puberty. Conversely, mammary epithelial expression of constitutively active TGF{beta}1 via the MMTV promoter suppressed proliferation of ER{alpha} positive cells. Thus, TGF{beta}1 activation functionally restrains ER{alpha} positive cells from proliferating in adult mammary gland. Accordingly, we propose that TGF{beta}1 dysregulation may promote proliferation of ER{alpha} positive cells associated with breast cancer risk in humans.

  3. TASK ORDER

    National Nuclear Security Administration (NNSA)

    NA0000XXX Task Order No: DE-DT000XXXX Statement of Work August 7, 2015 Task Order Title: Design, Integration, Construction, Communications, and Engineering (DICCE) Services for Port of Cat Lai, Vietnam. Scope: The Contractor shall design, construct, and integrate fully functional portal monitor and communications systems at designated sites in Vietnam. * Port of Cat Lai Requirements Documents: The following task order requirements describe key milestones and deliverables. For a more complete

  4. Ordering Information

    Gasoline and Diesel Fuel Update (EIA)

    coal industry Natural gas trade (Table 4.3) Ordering Information This publication and other Energy Information Administration (EIA) publications may be purchased from the...

  5. ARM: 10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Sivaraman, Chitra; Flynn, Connor

    2010-12-15

    10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm

  6. ARM: 10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Sivaraman, Chitra; Flynn, Connor

    2010-12-15

    10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm

  7. ARM: 10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Sivaraman, Chitra; Flynn, Connor

    10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm

  8. ARM: 10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Sivaraman, Chitra; Flynn, Connor

    10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm

  9. 1982 Orders

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOCKET FE CITE DATE NUMBER APPLICANT NAME ORDER NO. 70116.ERA 121482 82-04-LNG PhillipsMarathon 49 70552.ERA 113082 82-09-NG Northern Natural Gas 48 70541.ERA 110182...

  10. Temporary Emergency Exposure Limits for Chemicals: Methods and Practice

    Energy Savers [EERE]

    DOE-HDBK-1046-2008 August 2008 DOE HANDBOOK TEMPORARY EMERGENCY EXPOSURE LIMITS FOR CHEMICALS: METHODS AND PRACTICE U.S. Department of Energy AREA EMER Washington, D.C. 20585 DOE-HDBK-1046-2008 ii DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1046-2008 iii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.energy.gov/nuclearsafety/techstds/ DOE-HDBK-1046-2008 iv FOREWORD In 2005, the Office of Emergency

  11. Temporary coatings for protection of microelectronic devices during packaging

    DOE Patents [OSTI]

    Peterson, Kenneth A.; Conley, William R.

    2005-01-18

    The present invention relates to a method of protecting a microelectronic device during device packaging, including the steps of applying a water-insoluble, temporary protective coating to a sensitive area on the device; performing at least one packaging step; and then substantially removing the protective coating, preferably by dry plasma etching. The sensitive area can include a released MEMS element. The microelectronic device can be disposed on a wafer. The protective coating can be a vacuum vapor-deposited parylene polymer, silicon nitride, metal (e.g. aluminum or tungsten), a vapor deposited organic material, cynoacrylate, a carbon film, a self-assembled monolayered material, perfluoropolyether, hexamethyldisilazane, or perfluorodecanoic carboxylic acid, silicon dioxide, silicate glass, or combinations thereof. The present invention also relates to a method of packaging a microelectronic device, including: providing a microelectronic device having a sensitive area; applying a water-insoluble, protective coating to the sensitive area; providing a package; attaching the device to the package; electrically interconnecting the device to the package; and substantially removing the protective coating from the sensitive area.

  12. Memorandum, Interim Procedures During Temporary Suspension of Electronic Questionnaires for Investigations Processing System

    Broader source: Energy.gov [DOE]

    On July 2, 2015, the Director of OPM and the Director of National Intelligence (DNI) jointly issued a memorandum outlining temporary equivalencies to facilitate hiring, credentialing and eligibility determinations during the period of e-QIP suspension.

  13. SA 2712-CVC;CONTRACTOR/VISITOR COMPUTERS TEMPORARY ONE TIME EXCEPTION...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SA 2712-CVC (9-2009) Supersedes (6-2009) issue Page 2 of 2 ContractorVisitor Computers Temporary, One-Time Exception to SNL Policy This form must be completed and signed...

  14. Application to Export Electric Energy OE Docket No. EA-318-B AEP Energy Partners, Inc: Emergency Filing from AEP Requesting Temporary Export Authorization Extension

    Broader source: Energy.gov [DOE]

    Application from AEP Energy requesting temporary export authorization extension to export electric energy to Mexico.

  15. EVALUATION OF THE TEMPORARY TENT COVER TRUSS SYSTEM AP PRIMARY VENT SYSTEM

    SciTech Connect (OSTI)

    HAQ MA

    2009-12-31

    The purpose of this calculation is to evaluate a temporary ten cover truss system. This system will be used to provide weather protection to the workers during replacement of the filter for the Primary Ventilation System in AP Tank Farm. The truss system has been fabricated utilizing tubes and couplers, which are normally used for scaffoldings.

  16. Memorandum, Request for Concurrence on fire Temporary Variance Applications Regarding Fire Protection and Pressure Safety at the Oak Ridge National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    Request for Concurrence on Three Temporary Variance Applications Regarding Fire Protection and Pressure Safety at the Oak Ridge National Laboratory

  17. Improving the Success Rate of Delivering Annual Occupational Dosimetry Reports to Persons Issued Temporary External Dosimeters

    SciTech Connect (OSTI)

    Mallett, Michael Wesley

    2014-09-09

    Workers who are not routinely monitored for occupational radiation exposure at LANL may be issued temporary dosimeters in the field. Per 10CFR835 and DOE O 231.1A, the Laboratory's radiation protection program is responsible for reporting these results to the worker at the end of the year. To do so, the identity of the worker and their mailing address must be recorded by the delegated person at the time the dosimeter is issued. Historically, this data has not been consistently captured. A new online application was developed to record the issue of temporary dosimeters. The process flow of the application was structured such that: 1) the worker must be uniquely identified in the Lab's HR database, and 2) the mailing address of record is verified live time via a commercial web service, for the transaction to be completed. A COPQ savings (Type B1) of $96K/year is demonstrated for the new application.

  18. Polymers with increased order

    DOE Patents [OSTI]

    Sawan, Samuel P. (Tyngsborough, MA); Talhi, Abdelhafid (Rochester, MI); Taylor, Craig M. (Jemez Springs, NM)

    1998-08-25

    The invention features polymers with increased order, and methods of making them featuring a dense gas.

  19. Compliance Order on Consent

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compliance Order on Consent Compliance Order on Consent The Compliance Order on Consent provides the requirements for environmental cleanup of hazardous constituents for LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email What is the Compliance Order on Consent? The Compliance Order on Consent between the State of New Mexico Environment Department and the United States Department of Energy and Los Alamos National

  20. NNSA orders security enhancements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA orders security enhancements NNSA orders security enhancements Because of this government order, until further notice all vehicles entering government property will be required to stop at the East and West Jemez Road "Vehicle Access Portals" (VAPs) for a vehicle check. December 21, 2012 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience,

  1. HSI Tape Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tape Ordering HSI Tape Ordering General Procedure If you are retrieving multiple files from HPSS, it is best to order your retrieval requests in a way that makes sense for the HPSS system. In HPSS, files initially go onto a disk cache and migrate to tape as time passes. This means that files that were put into HPSS at the same time could end up spread across multiple tapes. Since each tape must by loaded into the reader, it will be fastest if you order your requests so that you are pulling all

  2. Portsmouth Administrative Consent Order

    Broader source: Energy.gov [DOE]

    Portsmouth Administrative Consent Order ensures compliance by DOE at the Portsmouth Site with the Resource Recovery and Compensation Act, the Comprehensive Environmental Response, Compensation, and...

  3. Temporary Bridging Agents for use in Drilling and Completion of Enhanced Geothermal Systems

    SciTech Connect (OSTI)

    Watters, Larry; Watters, Jeff; Sutton, Joy; Combs, Kyle; Bour, Daniel; Petty, Susan; Rose, Peter; Mella, Michael

    2011-12-21

    CSI Technologies, in conjunction with Alta Rock Energy and the University of Utah have undergone a study investigating materials and mechanisms with potential for use in Enhanced Geothermal Systems wells as temporary diverters or lost circulation materials. Studies were also conducted with regards to particle size distribution and sealing effectiveness using a lab-scale slot testing apparatus to simulate fractures. From the slot testing a numerical correlation was developed to determine the optimal PSD for a given fracture size. Field trials conducted using materials from this study were also successful.

  4. Directives System Order

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-10-16

    The order prescribes the process for development of Policy Statements, Orders, Notices, Manuals and Guides, which are intended to guide, inform, and instruct employees in the performance of their jobs, and enable them to work effectively within the Department and with agencies, contractors, and the public.

  5. Memorandum Request for Concurrence on firee Temporary Variance Applications Regarding Fire Protection and Pressure Safety at the Oak Ridge National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    Memorandum Request for Concurrence on firee Temporary Variance Applications Regarding Fire Protection and Pressure Safety at the Oak Ridge National Laboratory

  6. URS Consent Order

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... By signing this Consent Order, URS agrees to remit 112,500 monetary remedy, payable to ... reflecting an agreed upon monetary remedy in lieu of the issuance of an enforcement ...

  7. First-order

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    order nite-Larmor-radius eects on magnetic tearing and relaxation in pinch congurations by Jacob King A dissertation submitted in partial fulllment of the requirements for the degree of Doctor of Philosophy (Physics) at the UNIVERSITY OF WISCONSIN-MADISON 2011 i Abstract Drift and Hall eects on magnetic tearing, island evolution, and relaxation in pinch congurations are investigated using a non-reduced uid model with rst-order FLR eects. When the

  8. Order 13287, Preserve America

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 In response to requirements of Executive Order 13287, Preserve America Office of History and Heritage Resources Office of the Executive Secretariat U.S. Department of Energy September 2014 An Assessment of Historic Properties and Preservation Activities at the U.S. Department of Energy Table of Contents Introduction ............................................................................................................................................ 3 Part I. Background and Overview

  9. NMED Consent Order

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begins environmental sampling in townsite September 25, 2008 Vicinity of Upper LA Canyon Investigated as Part of NMED Consent Order LOS ALAMOS, New Mexico, September 25, 2008-Environmental sampling, conducted on behalf of Los Alamos National Laboratory in the town of Los Alamos near upper Los Alamos Canyon, has begun. Known as the Upper Los Alamos Canyon Project, this effort is an environmental assessment of areas that have been or could have been affected by Laboratory operations from the days

  10. Paperclips Etc. Special Order Form

    Broader source: Energy.gov (indexed) [DOE]

    PSS-02.2 (March 7, 2011) Replaces PSS-02.1 PAPERCLIPS Etc. SPECIAL Orders Form This form is used to order supplies that are not readily available in the DOE HQ self-service supply...

  11. Price Quotes and Isotope Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ordering Price Quotes and Isotope Ordering Isotopes produced at Los Alamos National Laboratory are saving lives, advancing cutting-edge research and keeping the U.S. safe. Isotope...

  12. ORDER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rack or container with the firing chamber empty. During normal operations, long guns (e.g., rifles, shotguns, submachine guns) must not be carried with a round in the...

  13. Self-decomposable Fibrous Bridging Additives for Temporary Cementitious Fracture Sealers in EGS Wells

    SciTech Connect (OSTI)

    Sugama T.; Pyatina, T.; Gill, S.; Kisslinger, K.; Iverson, B.; Bour, D.

    2012-11-01

    This study evaluates compatibility of a self-degradable temporary fracture sealer with the drilling mud and plugging and self-degrading performance of different fibers to be used in combination with the sealer. The sodium silicate-activated slag/Class C fly ash (SSASC) cementitious sealer must plug fractures at 85oC to allow continuous well drilling and it must degrade and leave the fractures open for water at later times when exposed to temperatures above 200oC. The sealer showed good compatibility with the mud. Even the blend of 80/20 vol.% of sealer/mud reached a compressive strength of more than 2000 psi set as one of the material criteria, mostly due to the additional activation of the slag and Class C fly ash by the alkaline ingredient present in the drilling fluid. In contrast, the drilling fluid was detrimental to the compressive strength development in conventional Class G well cement, so that it failed to meet this criterion. Among several organic fibers tested both polyvinyl alcohol (PVA)-and nylon-based fibers showed adequate plugging of the sealer in slot nozzles of 1-in. wide x 6-in. long x 0.08 in. and 0.24 in. high under pressures up to 700 psi. PVA fibers displayed better compressive toughness and self-degrading properties than nylon. The compressive toughness of sealers made by adding 1.0 wt% 6 mm-length PVA and 0.5 wt% 19 mm-length PVA was 9.5-fold higher than that of a non-bridged sealer. One factor governing the development of such high toughness was an excellent adherence of PVA to the SSASC cement. The alkali-catalyzed self-decomposition of PVA at 200°C led to the morphological transformation of the material from a fibrous structure to a microscale flake-like structure that helped the desirable conversion of the sealer into small fragments. In contrast, nylon’s decomposition provided a reticular network structure in the self-degraded sealer resulting in bigger fragments compared against the sealer with PVA. The PVA fiber has a high potential as a self-decomposable bridging additive in the SSASC cement sealer.

  14. Field Derived Emission Factors For Formaldehyde and other Volatile Organic Compounds in FEMA Temporary Housing Units

    SciTech Connect (OSTI)

    Parthasarathy, Srinandini; Maddalena, Randy L.; Russell, Marion L.; Apte, Michael G.

    2010-10-01

    Sixteen previously occupied temporary housing units (THUs) were studied to assess emissions of volatile organic compounds. The whole trailer emission factors wereevaluated for 36 VOCs including formaldehyde. Indoor sampling was carried out in the THUs located in Purvis staging yard in Mississippi, USA. Indoor temperature andrelative humidity (RH) were also measured in all the trailers during sampling. Indoor temperatures were varied (increased or decreased) in a selection of THUs using theheating, ventilation and air conditioning (HVAC) systems. Indoor temperatures during sampling ranged from 14o C to 33o C, and relative humidity (RH) varied between 35percentand 74percent. Ventilation rates were increased in some trailers using bathroom fans and vents during some of the sampling events. Ventilation rates measured during some aselection of sampling events varied from 0.14 to 4.3 h-1. Steady state indoor formaldehyde concentrations ranged from 10 mu g-m-3 to 1000 mu g-m-3. The formaldehyde concentrations in the trailers were of toxicological significance. The effects of temperature, humidity and ventilation rates were also studied. A linearregression model was built using log of percentage relative humidity, inverse of temperature (in K-1), and inverse log ACH as continuous independent variables, trailermanufacturer as a categorical independent variable, and log of the chemical emission factors as the dependent variable. The coefficients of inverse temperature, log relativehumidity, log inverse ACH with log emission factor were found to be statistically significant for all the samples at the 95percent confidence level. The regression model wasfound to explain about 84percent of the variation in the dependent variable. Most VOC concentrations measured indoors in the Purvis THUs were mostly found to be belowvalues reported in earlier studies by Maddalena et al.,1,2 Hodgson et al.,3 and Hippelein4. Emissions of TMPB-DIB (a plasticizer found in vinyl products) were found to be higher than values reported in comparable housing by Hodgson et al.,3. Emissions of phenol were also found to be slightly higher than values reported in earlier studies1,2,3. This study can assist in retrospective formaldehyde exposure assessments of THUs where estimates of the occupants indoor formaldehyde exposures are needed.

  15. Competition Advocates and Task-Order and Delivery Order Ombudsman |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration Competition Advocates and Task-Order and Delivery Order Ombudsman | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact

  16. DOE - Fossil Energy: Orders-2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LLC Order Granting Blanket Authority to Export LNG to Dominican Republic, El Salvador, Guatemala, Honduras, and Nicaragua in ISO Containers by Vessel. 3370 13-142-NG 12...

  17. Public Order and Safety Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    | Activity Subcategories | Energy Use Public Order and Safety Buildings... Volunteer fire stations tend not to be government owned, which probably explains why 33 percent of...

  18. ALDEHYDE AND OTHER VOLATILE ORGANIC CHEMICAL EMISSIONS IN FOUR FEMA TEMPORARY HOUSING UNITS ? FINAL REPORT

    SciTech Connect (OSTI)

    Salazar, Olivia; Maddalena, Randy L.; Russell, Marion; Sullivan, Douglas P.; Apte, Michael G.

    2008-05-04

    Four unoccupied FEMA temporary housing units (THUs) were studied to assess their indoor emissions of volatile organic compounds including formaldehyde. Measurement of whole-THU VOC and aldehyde emission factors (mu g h-1 per m2 of floor area) for each of the four THUs were made at FEMA's Purvis MS staging yard using a mass balance approach. Measurements were made in the morning, and again in the afternoon in each THU. Steady-state indoor formaldehyde concentrations ranged from 378 mu g m-3 (0.31ppm) to 632 mu g m-3 (0.52 ppm) in the AM, and from 433 mu g m-3 (0.35 ppm) to 926 mu g m-3 (0.78 ppm) in the PM. THU air exchange rates ranged from 0.15 h-1 to 0.39 h-1. A total of 45 small (approximately 0.025 m2) samples of surface material, 16 types, were collected directly from the four THUs and shipped to Lawrence Berkeley Laboratory. The material samples were analyzed for VOC and aldehyde emissions in small stainless steel chambers using a standard, accurate mass balance method. Quantification of VOCs was done via gas chromatography -- mass spectrometry and low molecular weight aldehydes via high performance liquid chromatography. Material specific emission factors (mu g h-1 per m2 of material) were quantified. Approximately 80 unique VOCs were tentatively identified in the THU field samples, of which forty-five were quantified either because of their toxicological significance or because their concentrations were high. Whole-trailer and material specific emission factors were calculated for 33 compounds. The THU emission factors and those from their component materials were compared against those measured from other types of housing and the materials used in their construction. Whole THU emission factors for most VOCs were typically similar to those from comparative housing. The three exceptions were exceptionally large emissions of formaldehyde and TMPD-DIB (a common plasticizer in vinyl products), and somewhat elevated for phenol. Of these three compounds, formaldehyde was the only one with toxicological significance at the observed concentrations. Whole THU formaldehyde emissions ranged from 173 to 266 mu g m-2 h 1 in the morning and 257 to 347 mu g m-2 h-1 in the afternoon. Median formaldehyde emissions in previously studied site-built and manufactured homes were 31 and 45 mu g m-2 h-1, respectively. Only one of the composite wood materials that was tested appeared to exceed the HUD formaldehyde emission standard (430 mu g/m2 h-1 for particleboard and 130 mu g/m2 h-1 for plywood). The high loading factor (material surface area divided by THU volume) of composite wood products in the THUs and the low fresh air exchange relative to the material surface area may be responsible for the excessive concentrations observed for some of the VOCs and formaldehyde.

  19. High-Order/Low-Order methods for ocean modeling

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Newman, Christopher; Womeldorff, Geoff; Chacón, Luis; Knoll, Dana A.

    2015-06-01

    We examine a High Order/Low Order (HOLO) approach for a z-level ocean model and show that the traditional semi-implicit and split-explicit methods, as well as a recent preconditioning strategy, can easily be cast in the framework of HOLO methods. The HOLO formulation admits an implicit-explicit method that is algorithmically scalable and second-order accurate, allowing timesteps much larger than the barotropic time scale. We demonstrate how HOLO approaches, in particular the implicit-explicit method, can provide a solid route for ocean simulation to heterogeneous computing and exascale environments.

  20. Emerson: Order (2014-CE-54001)

    Broader source: Energy.gov [DOE]

    DOE ordered Emerson Electric Co. to pay a $8,000 civil penalty after finding Emerson had failed to certify that certain models of metal halide lamp fixtures comply with the applicable energy conservation standards.

  1. Trastar: Order (2013-CE-49003)

    Broader source: Energy.gov [DOE]

    DOE ordered Trastar Inc. to pay a $8,000 civil penalty after finding Trastar had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  2. Simkar: Order (2012-SE-5408)

    Broader source: Energy.gov [DOE]

    DOE ordered Simkar Corporation to pay a $28,193 civil penalty after finding Simkar had manufactured and distributed in commerce in the U.S. 326 units of a variety of noncompliant metal halide lamp fixtures basic models.

  3. TMP: Order (2013-CE-5334)

    Broader source: Energy.gov [DOE]

    DOE ordered TMP Manufacturing Company, Inc. to pay a $8,000 civil penalty after finding TMP had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  4. Sylvane: Order (2013-CE-36005)

    Broader source: Energy.gov [DOE]

    DOE ordered Sylvane, Inc. to pay a $4,000 civil penalty after finding Sylvane had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  5. Averen: Order (2010-CW-0711)

    Broader source: Energy.gov [DOE]

    DOE ordered Averen, Inc. to pay a $5,000 civil penalty after finding Averen had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  6. Perlick: Order (2011-SE-1401)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $400 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. at least two noncompliant model HP48RO, electric refrigerators.

  7. Aircooler: Order (2013-CE-5338)

    Broader source: Energy.gov [DOE]

    DOE ordered Aircooler Corporation to pay a $8,000 civil penalty after finding Aircooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  8. Nicor: Order (2014-CE-32016)

    Broader source: Energy.gov [DOE]

    DOE ordered Nicor, Inc. to pay a $8,000 civil penalty after finding Nicor had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  9. Amerikooler: Order (2013-CE-5307)

    Broader source: Energy.gov [DOE]

    DOE ordered Amerikooler, Inc. to pay a $8,000 civil penalty after finding Amerikooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  10. Amerisink: Order (2010-CW-0710)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Amerisink, Inc. to pay a $5,000 civil penalty after finding Amerisink had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  11. Leer: Order (2013-CE-5325)

    Broader source: Energy.gov [DOE]

    DOE ordered Leer, Inc. to pay a $8,000 civil penalty after finding Leer had failed to certify that certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards.

  12. Electrolux: Order (2012-CE-1901)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America to pay a $6,500 civil penalty after finding Electrolux had failed to certify that certain dishwashers comply with the applicable energy conservation standard.

  13. Litex: Order (2014-CE-32011)

    Broader source: Energy.gov [DOE]

    DOE ordered Litex Industries, Limited to pay a $8,000 civil penalty after finding Litex had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  14. Dacor: Order (2014-CE-23010)

    Broader source: Energy.gov [DOE]

    DOE ordered Dacor to pay a $8,000 civil penalty after finding Dacor had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  15. Whirlpool: Order (2014-CE-21010)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Whirlpool Corporation to pay a $8,000 civil penalty after finding Whirlpool had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  16. DHI: Order (2014-CE-32004)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered DHI Corp. to pay a $8,000 civil penalty after finding DHI had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  17. Vaxcel: Order (2014-CE-32006)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Vaxcel International Co., Ltd. to pay a $8,000 civil penalty after finding Vaxcel had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  18. Electrolux: Order (2014-CE-23015)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America, Inc. to pay a $16,000 civil penalty after finding Electrolux had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  19. Winix: Order (2012-CE-3607)

    Broader source: Energy.gov [DOE]

    DOE ordered Cloud 9 Marketing, Inc. d/b/a Winix, Inc., to pay a $8,000 civil penalty after finding Winix had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  20. Smeg: Order (2014-CE-23003)

    Broader source: Energy.gov [DOE]

    DOE ordered Smeg USA, Inc. to pay a $16,000 civil penalty after finding Smeg had failed to certify that certain models of refrigerators/refrigerator-freezers/freezers, dishwashers, and cooking products comply with the applicable energy conservation standards.

  1. Curtis: Order (2015-CE-14021)

    Broader source: Energy.gov [DOE]

    DOE ordered Curtis International, Ltd. to pay a $5,800 civil penalty after finding Curtis had failed to certify that refrigerator-freezer basic model FR9211 complies with the applicable energy conservation standards.

  2. Perlick: Order (2013-SE-14002)

    Broader source: Energy.gov [DOE]

    DOE ordered Perlick Corporation to pay a $60,725 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. 347 units of basic model HP48RR, a noncompliant refrigerator.

  3. BSH: Order (2013-CE-2001)

    Broader source: Energy.gov [DOE]

    DOE ordered BSH Home Appliances Corp. to pay a $8,000 civil penalty after finding BSH had failed to certify that certain models of residential clothes washers comply with the applicable energy/water conservation standards.

  4. Avanti: Order (2013-CE-2105)

    Broader source: Energy.gov [DOE]

    DOE ordered Avanti Products, LLC to pay a $8,000 civil penalty after finding Avanti had failed to certify that certain models of residential clothes dryers comply with the applicable energy conservation standards.

  5. Almo: Order (2012-CE-1416)

    Broader source: Energy.gov [DOE]

    DOE ordered Almo Corporation to pay a $6,500 civil penalty after finding Almo had failed to certify that certain models of residential refrigerators comply with the applicable energy conservation standards.

  6. Northland: Order (2014-CE-23002)

    Broader source: Energy.gov [DOE]

    DOE ordered Northland Corporation d/b/a AGA Marvel to pay a $16,000 civil penalty after finding Northland had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  7. Sunpentown: Order (2012-CE-1505)

    Broader source: Energy.gov [DOE]

    DOE ordered Sunpentown International Inc. to pay a $12,160 civil penalty after finding Sunpentown had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

  8. Quorum: Order (2014-CE-32013)

    Broader source: Energy.gov [DOE]

    DOE ordered Davoil, Inc. d/b/a Quorum International, Inc. to pay a $8,000 civil penalty after finding Quorum had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  9. Sears: Order (2012-CE-3606)

    Broader source: Energy.gov [DOE]

    DOE ordered Sears, Roebuck & Co. to pay an $8,000 civil penalty after finding Sears had failed to certify that Sears dehumidifiers comply with the applicable energy conservation standard.

  10. Haier: Order (2011-CE-2104)

    Broader source: Energy.gov [DOE]

    DOE ordered Haier to pay an $20,000 civil penalty after finding Haier had failed to certify that Haier residential clothes dryers comply with the applicable energy conservation standard.

  11. TCP: Order (2011-CE-3501)

    Broader source: Energy.gov [DOE]

    DOE ordered Technical Consumer Products, Inc. to pay a $3,000 civil penalty after finding TCP had failed to certify that a certain model of medium base compact fluorescent lamp (CFL) complies with the applicable energy conservation standards.

  12. Leotek: Order (2013-CE-4903)

    Broader source: Energy.gov [DOE]

    DOE ordered Leotek Electronics USA Corp. to pay a $8,000 civil penalty after finding Leotek had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  13. Keystone: Order (2013-CE-2601)

    Broader source: Energy.gov [DOE]

    DOE ordered Keystone Technologies, LLC to pay a $8,000 civil penalty after finding Keystone had failed to certify that certain models of fluorescent lamp ballasts comply with the applicable energy conservation standards.

  14. Electrolux: Order (2015-CE-14020)

    Broader source: Energy.gov [DOE]

    DOE ordered Electrolux North America, Inc. to pay a $20,000 civil penalty after finding Electrolux had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standards.

  15. Acuity: Order (2013-CE-4802)

    Broader source: Energy.gov [DOE]

    DOE ordered Acuity Brands Lighting to pay a $8,000 civil penalty after finding Acuity had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards.

  16. Hydac: Order (2012-SE-4107)

    Broader source: Energy.gov [DOE]

    DOE ordered Hydac Technology Corporation to pay a $29,000 civil penalty after finding Hydac had manufactured and distributed in commerce in the U.S. noncompliant electric motors.

  17. DOE Order on Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AVAILABLE ONLINE AT: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order,

  18. Endovascular Mechanical Recanalisation After Intravenous Thrombolysis in Acute Anterior Circulation Stroke: The Impact of a New Temporary Stent

    SciTech Connect (OSTI)

    Fesl, Gunther Patzig, Maximilian; Holtmannspoetter, Markus; Mayer, Thomas E.; Pfefferkorn, Thomas; Opherk, Christian; Brueckmann, Hartmut; Wiesmann, Martin

    2012-12-15

    Purpose: Treatment of acute stroke by endovascular mechanical recanalisation (EMR) has shown promising results and continues to be further refined. We evaluated the impact of a temporary stent compared with our results using other mechanical devices. Materials and Methods: We analysed clinical and radiological data of all patients who were treated by EMR after intravenous thrombolysis for acute carotid T- and middle-cerebral artery (M1) occlusions at our centre between 2007 and 2011. A comparison was performed between those patients in whom solely the stent-retriever was applied (group S) and those treated with other devices (group C). Results: We identified 14 patients for group S and 16 patients for group C. Mean age, National Institute of Health Stroke Scale score, and time to treatment were 67.1 years and 16.5 and 4.0 h for group S and 61.1 years and 17.6 and 4.5 h for group C, respectively. Successful recanalisation (thrombolysis in cerebral infarction scores {>=}IIb) was achieved in 93% of patients in group S and 56% of patients in group C (P < 0.05). Mean recanalisation times for M1 occlusions were 23 min (group S) and 29 min (group C) and for carotid-T occlusions were 39 min (group S) and 50 min (group C), and 45% of the patients in group S and 33% in group C had a favourable outcome (Modified Rankin Scale score {<=}2). Conclusion: The findings suggest an improvement in recanalisation success by the application of a temporary stent compared with previously used devices. These results are to be confirmed by larger studies.

  19. Price Quotes and Isotope Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ordering Price Quotes and Isotope Ordering Isotopes produced at Los Alamos National Laboratory are saving lives, advancing cutting-edge research and keeping the U.S. safe. Isotope Business Office Oak Ridge National Laboratory 1 Bethel Valley Rd Bldg. 5700, Room R111 MS-6158 Oak Ridge, TN 37830-6158 Phone: (865) 574-6984 Fax: (865) 574-6986 http://www.isotopes.gov/ Technical Support Information regarding technical details on listed and unlisted isotopes may be obtained from: Mark Brugh Team

  20. Midea: Order (2014-SW-20001)

    Broader source: Energy.gov [DOE]

    DOE ordered Hefei Rongshida Washing Equipment Manufacturing Co., Ltd. ("Hefei Rongshida"), a subsidiary of Midea Group, to pay a $64,780 civil penalty after finding Hefei Rongshida had manufactured and distributed in commerce in the U.S. 324 units of MAE80-S1702GPS, a noncompliant residential clothes washer.

  1. PQL: Order (2013-CE-27001)

    Broader source: Energy.gov [DOE]

    DOE ordered P.Q.L., Inc. to pay a $8,000 civil penalty after finding PQL had failed to certify that various basic models of medium base compact fluorescent lamps, general service fluorescent lamps, fluorescent lamp ballasts, and illuminated exit signs comply with the applicable energy conservation standards.

  2. Watermark: Order (2011-SW-2908)

    Broader source: Energy.gov [DOE]

    DOE ordered Watermark Designs, Ltd. to pay a $4,200 civil penalty after finding Watermark Designs, Ltd. had manufactured and distributed in commerce in the U.S. sixty-three units of basic model SH-FAL90, a noncompliant showerhead.

  3. Topaz: Order (2014-CE-35005)

    Broader source: Energy.gov [DOE]

    DOE ordered Topaz Lighting Corp. to pay a $8,000 civil penalty after finding Topaz had failed to certify that certain basic models of medium base compact fluorescent lamps, general service fluorescent lamps, and illuminated exit signs comply with the applicable energy conservation standards.

  4. Whirlpool: Order (2013-SE-1420)

    Broader source: Energy.gov [DOE]

    DOE ordered Whirlpool Corporation to pay a $5,329,800 civil penalty after finding Whirlpool had manufactured and distributed in commerce in the U.S. at least 26,649 units of basic model 8TAR81 noncompliant refrigerator-freezer.

  5. Order 430.1D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    430.1D Title: REAL PROPERTY ASSET MANAGEMENT Owner: Nathan Campus, Site Operations Division, Office of Institutional Operations Approving Official: Bradley J. Tomer, Chief Operating Officer, Office of the Director {signature} /s/ Bradley J. Tomer Approval Date: 7/20/12 Last Reviewed Date: 7/20/12 Cancellation: Order 430.1C, Real Property Asset Management TABLE OF CONTENTS 1. PURPOSE

  6. Order 580.1D

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    580.1D Title: PERSONAL PROPERTY MANAGEMENT Owner: Thomas Wilson, Jr., Office of Institutional Operations Approving Official: Bradley J. Tomer, Chief Operating Officer, Office of the Director {signature} /s/ Bradley J. Tomer Approval Date: 8/3/12 Last Reviewed Date: 8/3/12 Cancellation: Order 580.1C, Personal Property Management TABLE OF CONTENTS 1. PURPOSE ..................................................................................................................................... 2 2.

  7. Kichler: Order (2014-CE-32007)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered The L.D. Kichler Co. d/b/a Kichler Lighting to pay a $8,000 civil penalty after finding Kichler had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  8. Yosemite: Order (2014-CE-32015)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Northern Central Distributing, Inc. d/b/a Yosemite Home Dcor to pay a $8,000 civil penalty after finding Yosemite had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  9. Midea: Order (2013-SE-1505)

    Broader source: Energy.gov [DOE]

    DOE ordered GD Midea Air-Conditioning Equipment Co. Ltd. to pay a $416,800 civil penalty after finding Midea had manufactured and distributed in commerce in the U.S. atleast 14,968 units of basic model MWJ1-08ERN1-BI8, a noncompliant room air conditioner.

  10. Versonel: Order (2014-CE-21009)

    Broader source: Energy.gov [DOE]

    DOE ordered Smart Surplus, Inc. d/b/a Versonel to pay a $8,000 civil penalty after finding Versonel had failed to certify that certain models of refrigerators and residential clothes dryers comply with the applicable energy conservation standards.

  11. Hicon: Order (2013-SE-1426)

    Broader source: Energy.gov [DOE]

    DOE ordered Ningbo Hicon International Industry Company, Ltd. to pay a $1,912,714 civil penalty after finding Hicon had manufactured and distributed in commerce in the U.S. 115,126 units of basic model BD-200, a noncompliant freezer.

  12. Teddico: Order (2012-SE-5409)

    Broader source: Energy.gov [DOE]

    DOE ordered The Electrical Design, Development and Implementation Company d/b/a Teddico to pay a $18,994 civil penalty after finding Teddico had manufactured and distributed in commerce in the U.S. 218 units of a variety of noncompliant metal halide lamp fixtures basic models.

  13. LG: Order (2014-SE-15011)

    Broader source: Energy.gov [DOE]

    DOE ordered LG Electronics USA, Inc. to pay a $1,479,860 civil penalty after finding LG had manufactured and distributed in commerce in the U.S. at least 7,438 units of basic model LT143CNR, a noncompliant room air conditioner.

  14. Universal: Order (2013-SE-26004)

    Broader source: Energy.gov [DOE]

    DOE ordered Universal Lighting Technologies, Inc. to pay a $7,264 civil penalty after finding Universal had manufactured and distributed in commerce in the U.S. 454 units of model B140R277HP, a noncompliant fluorescent lamp ballast.

  15. Philips: Order (2012-SE-2605)

    Broader source: Energy.gov [DOE]

    DOE ordered Philips Lighting Electronics N. A. to pay a $82,478 civil penalty after finding Philips had manufactured and distributed in commerce in the U.S. 7,498 units of basic model VEL-1S40-SC, noncompliant fluorescent lamp ballasts.

  16. Cooper: Order (2012-SE-4701)

    Broader source: Energy.gov [DOE]

    DOE ordered Cooper Power Systems, LLC to abide by the Compromise Agreement, which waived the civil penalty after finding Cooper had inadvertently distributed in commerce in the U.S. three models (total of five units) of distribution transformers. Cooper agrees to abide by the terms of a Notice of Noncompliance Determination to be issued pursuant to 10 C.F.R. 429.114.

  17. YMGI: Order (2011-SCE-1605)

    Broader source: Energy.gov [DOE]

    DOE ordered YMGI Group LLC to pay a $31,400 civil penalty after finding (1) YMGI had failed to certify that certain models of residential central air conditioners comply with the applicable energy conservation standards and (2) YMGI had distributed in commerce model TTWC-18K-31B, a through-the-wall air conditioner that does not meet the applicable energy conservation standard.

  18. International Refrigeration: Order (2012-CE-1510) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Refrigeration: Order (2012-CE-1510) International Refrigeration: Order (2012-CE-1510) July 20, 2012 DOE ordered International Refrigeration Products to pay an 8,000 ...

  19. Scaling exponents for ordered maxima

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ben-Naim, E.; Krapivsky, P. L.; Lemons, N. W.

    2015-12-22

    We study extreme value statistics of multiple sequences of random variables. For each sequence with N variables, independently drawn from the same distribution, the running maximum is defined as the largest variable to date. We compare the running maxima of m independent sequences and investigate the probability SN that the maxima are perfectly ordered, that is, the running maximum of the first sequence is always larger than that of the second sequence, which is always larger than the running maximum of the third sequence, and so on. The probability SN is universal: it does not depend on the distribution frommore » which the random variables are drawn. For two sequences, SN~N–1/2, and in general, the decay is algebraic, SN~N–σm, for large N. We analytically obtain the exponent σ3≅1.302931 as root of a transcendental equation. Moreover, the exponents σm grow with m, and we show that σm~m for large m.« less

  20. Scaling exponents for ordered maxima

    SciTech Connect (OSTI)

    Ben-Naim, E.; Krapivsky, P. L.; Lemons, N. W.

    2015-12-22

    We study extreme value statistics of multiple sequences of random variables. For each sequence with N variables, independently drawn from the same distribution, the running maximum is defined as the largest variable to date. We compare the running maxima of m independent sequences and investigate the probability SN that the maxima are perfectly ordered, that is, the running maximum of the first sequence is always larger than that of the second sequence, which is always larger than the running maximum of the third sequence, and so on. The probability SN is universal: it does not depend on the distribution from which the random variables are drawn. For two sequences, SN~N–1/2, and in general, the decay is algebraic, SN~N–σm, for large N. We analytically obtain the exponent σ3≅1.302931 as root of a transcendental equation. Moreover, the exponents σm grow with m, and we show that σm~m for large m.

  1. Executive Order 13673 | Department of Energy

    Energy Savers [EERE]

    673 Executive Order 13673 Executive Order 13673, proposed Federal Acquisition Regulation rule, and proposed Department of Labor guidance are available at: Executive Order 13673 Proposed Federal Acquisition Regulation Rule Proposed Department of Labor Guidance Informational slides about the Executive Order are available below: File Executive Order 13673

  2. Long-Term Results of Brachytherapy With Temporary Iodine-125 Seeds in Children With Low-Grade Gliomas

    SciTech Connect (OSTI)

    Korinthenberg, Rudolf, E-mail: rudolf.korinthenberg@uniklinik-freiburg.d [Division of Neuropaediatrics and Muscular Disorders, Department of Paediatrics and Adolescent Medicine, University Hospital, Albert-Ludwigs University, Freiburg im Breisgau (Germany); Neuburger, Daniela [Division of Neuropaediatrics and Muscular Disorders, Department of Paediatrics and Adolescent Medicine, University Hospital, Albert-Ludwigs University, Freiburg im Breisgau (Germany); Trippel, Michael; Ostertag, Christoph; Nikkhah, Guido [Department of Stereotactic Neurosurgery, Neurocentre, University Hospital, Albert-Ludwigs University, Freiburg im Breisgau (Germany)

    2011-03-15

    Purpose: To retrospectively review the results of temporary I-125 brachytherapy in 94 children and adolescents with low-grade glioma. Methods and Materials: Treatment was performed in progressive tumors roughly spherical in shape with a diameter of up to 5 cm, including 79 astrocytomas, 5 oligodendrogliomas, 4 oligoastrocytomas, 1 ependymoma, and 5 other tumors. Location was suprasellar/chiasmal in 44, thalamic/basal ganglia in 18, hemispheric in 15, midbrain/pineal region in 13, and lower brainstem in 3. Initially, 8% of patients were free of symptoms, 47% were symptomatic but not disabled, and 30% were slightly, 6% moderately, and 3% severely disabled. Results: 5- and 10-year survival was 97% and 92%. The response to I-125 brachytherapy over the long term was estimated after a median observation period of 38.4 (range, 6.4-171.0) months. At that time, 4 patients were in complete, 27 in partial, and 18 in objective remission; 15 showed stable and 30 progressive tumors. Treatment results did not correlate with age, sex, histology, tumor size, location, or demarcation of the tumor. Secondary treatment became necessary in 36 patients, including 19 who underwent repeated I-125 brachytherapy. At final follow-up, the number of symptom-free patients had risen to 21%. Thirty-eight percent showed symptoms without functional impairment, 19% were slightly and 11% moderately disabled, and only 4% were severely disabled. Conclusions: Response rates similar to those of conventional radiotherapy or chemotherapy can be anticipated with I-125 brachytherapy in tumors of the appropriate size and shape. We believe it to be a useful contribution to the treatment of low-grade gliomas in children.

  3. Implementation of Executive Order 12114 Environmental Effects...

    Energy Savers [EERE]

    Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline Implementation of Executive Order 12114 Environmental Effects Abroad...

  4. Executive Order 13423: Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Executive Order 13514-Federal Leadership in Environmental, Energy, and Economic Performance Executive Order 13693-Planning for Federal Sustainability in the Next...

  5. Idaho National Engineering Laboratory Consent Order, November...

    Office of Environmental Management (EM)

    Consent Order, November 1, 1995 State Idaho Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Resolve LDR storage violations. Approve the modified "INEL Site...

  6. Public Order and Safety | Open Energy Information

    Open Energy Info (EERE)

    Safety Jump to: navigation, search Building Type Public Order and Safety Definition Buildings used for the preservation of law and order or public safety. Sub Categories police...

  7. Physician Treatment Order | Department of Energy

    Energy Savers [EERE]

    Physician Treatment Order Physician Treatment Order FEDERAL OCCUPATIONAL HEALTH Physician Treatment Orders - FOH-24 Form (formerly 229-B) PDF icon FOH-24 Physician Treatment Orders.pdf More Documents & Publications Allergy Injection Policy Handicapped Parking Guidance Before the House Foreign Affairs Subcommittee on Asia, the Pacific and the Global Environment

  8. Implementing Executive Order 13423 | Department of Energy

    Office of Environmental Management (EM)

    Implementing Executive Order 13423 Implementing Executive Order 13423 Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423. PDF icon instructions_eo13423.pdf More Documents & Publications Executive Order 13423 Implementing Instructions Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance

  9. TEMPORARY BADGE CHECKOUT SHEET

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOSIMETER ASSIGNMENT CHECK SHEET (Please type or print clearly) 1. Last Name: 2. First Name: 3. M.I.: 4. DOB (mmddyy): 5. SSN * : 6. Bengal ID: 7. Sex: M F 8. E-mail: 9. Home...

  10. Temporary Food Service

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Food Service The SLAC Caf, auditorium and visitor center have been closed and will be replaced with a new Science and User Support Building (SUSB). During this construction...

  11. cd ordering | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CD-DVD Ordering System Please complete the following information so the National Energy Technology Lab (NETL) can promptly process your order. Below is a sample of the fields...

  12. GreenOrder | Open Energy Information

    Open Energy Info (EERE)

    York Zip: 10016 Product: Founded in 2000, GreenOrder is a sustainability strategy and marketing firm References: GreenOrder1 This article is a stub. You can help OpenEI by...

  13. DNA Clone Ordering from Shotgun Clone Libraries

    Energy Science and Technology Software Center (OSTI)

    1995-11-28

    CORD is an implementation of an algorithm for determining the order of clones from shotgun clone libraries.

  14. Executive Order 13423- Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It is the policy of ...

  15. LLNS Beryllium Consent Order Fact Sheet

    Office of Environmental Management (EM)

    - LLNS Beryllium Consent Order SUMMARY OF CONSENT ORDER In November 2010, the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) issued a consent order to Lawrence Livermore National Security, LLC (LLNS) for deficiencies related to LLNS's implementation of DOE's Chronic Beryllium Disease Prevention Program (CBDPP) regulation at Lawrence Livermore National Laboratory. The consent order requires LLNS to implement corrective actions that will ensure LLNS meets

  16. Consent Order Update | Department of Energy

    Office of Environmental Management (EM)

    Consent Order Update Consent Order Update Topic: Pete Maggiore DOE, Provided Information on the Consent Order Work that Needs to be Completed. Information on the Fiscal Year Work Plan was also Provided. PDF icon Consent Order Update - September 24, 2014 More Documents & Publications Fiscal Year 2015 Annual Work Plan Update Fiscal Year 2014 Budget Update Fiscal Year 2014 and Fiscal Year 2015 Budget Update

  17. Antenna factorization in strongly ordered limits

    SciTech Connect (OSTI)

    Kosower, David A.

    2005-02-15

    When energies or angles of gluons emitted in a gauge-theory process are small and strongly ordered, the emission factorizes in a simple way to all orders in perturbation theory. I show how to unify the various strongly ordered soft, mixed soft-collinear, and collinear limits using antenna factorization amplitudes, which are generalizations of the Catani-Seymour dipole factorization function.

  18. STANDING ORDER 1. Standing Order Number: EP-DIV-S0-20222, R.O

    Office of Environmental Management (EM)

    STANDING ORDER 1. Standing Order Number: EP-DIV-S0-20222, R.O 2. Standing Order Type: (check one) [8J Division D Facility 3. Applicable Facilities: All EWMO Facilities 4. Standing Order Title: EWMO Legacy TRU Waste Pause 5. Distribution List: (By Functional Title) TA-54 Timely Order Book, Waste Characterization, Reduction, and Repackaging Facility (WCRRF) Timely Order Book, Radioassay and Nondestructive Testing (RANT) Facility Timely Order Book, and Environmental Programs (EP) Document Control

  19. Amendment No. 3 to Delegation Order No. 204-108 Delegation Order...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Amendment No. 3 to Delegation Order No. 204-108 Delegation Order for Approval of Power Marketing Administration Power and Transmission Rates by johnsonmd Functional areas:...

  20. President Truman Orders Development of Thermonuclear Weapon ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline President Truman Orders Development of Thermonuclear Weapon...

  1. Battelle Consent Order (WCO-2014-01)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Sincerely, Steven C. Simonson Director Office of Enforcement Office of Enterprise Assessments Enclosure: Consent Order (WCO-2014-01) cc: Julie Erickson, PNSO Cindy Doyle, Battelle

  2. Executive Order 13583, Establishing a Coordinated Government...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13583, Establishing a Coordinated Government-Wide Initiative to Promote Diversity and Inclusion in the Federal Workforce Executive Order 13583, Establishing a Coordinated...

  3. Executive Order 13514: Comprehensive Federal Fleet Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    guidance on meeting the fleet management requirements outlined in section 12 of Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance. PDF...

  4. Consent Order, Brookhaven Science Associates, LLC | Department...

    Energy Savers [EERE]

    Consent Order issued to Brookhaven Science Associates, LLC relating to an electrical shock event that occurred at the Brookhaven National Laboratory. On November 23,...

  5. NMED Presentation on Revised Consent Order

    Broader source: Energy.gov [DOE]

    At the November 12, 2015 Special NNMCAB Meeting NMED Secretary Ryan Flynn provided a presentation on the Revisions to the 2005 Order on Consent.

  6. Hexagonal Ordering of Nanoparticles | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    electron microscope, researchers can see the hexagonal ordering of nanoparticles in a gold nanoparticle membranes (right). This configuration helps researchers to simulate their...

  7. Engineered Solutions: Order (2010-CE-2112)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with Engineered Solutions, Inc. to resolve a case involving the failure to certify dehumidifier basic model SD109.

  8. Resonant radiation from oscillating higher order solitons

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Driben, R.; Yulin, A. V.; Efimov, A.

    2015-07-15

    We present radiation mechanism exhibited by a higher order soliton. In a course of its evolution the higher-order soliton emits polychromatic radiation resulting in formation of multipeak frequency comb-like spectral band. The shape and spectral position of this band can be effectively controlled by the relative strength of the third order dispersion. An analytical description is corroborated by numerical simulations. Research showed that for longer pulses the described effect persists also under the action of higher order perturbations such as Raman and self-steepening.

  9. NPS Director's Order | Open Energy Information

    Open Energy Info (EERE)

    NPS Director's Order Author NPS Recipient NPS Published Publisher Not Provided, 02232010 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet...

  10. Order, chaos and nuclear dynamics: An introduction

    SciTech Connect (OSTI)

    Swiatecki, W.J.

    1990-08-01

    This is an introductory lecture illustrating by simple examples the anticipated effect on collective nuclear dynamics of a transition from order to chaos in the motions of nucleons inside an idealized nucleus. The destruction of order is paralleled by a transition from a rubber-like to a honey-like behaviour of the independent-particle nuclear model. 10 refs., 6 figs.

  11. DOE Awards Small Business Task Order

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today announced the award of a Time and Materials Task Order to Industrial Economics, Incorporated, located in Cambridge, MA. Industrial Economics, Incorporated is a Small Business. The Task Order will have a maximum value of $1.77 million over 3 years.

  12. SU-E-T-145: Effects of Temporary Tachytherapy Inhibition Magnet On MOSFET Dose Measurements of Cardiovascular Implantable Electronic Devices (CIED) in Radiation Therapy Patients

    SciTech Connect (OSTI)

    P, Joshi; Salomons, G; Kerr, A; Peters, C; Lalonde, M

    2014-06-01

    Purpose: To determine the effects of temporary tachytherapy inhibition magnet on MOSFET dose measurements of cardiovascular implantable electronic devices (CIED) in radiation therapy patients. Methods: Infield and peripheral MOSFET dose measurements with 6MV photon beams were performed to evaluate dose to a CIED in the presence of a doughnut shaped temporary tachytherapy inhibition magnet. Infield measurements were done to quantify the effects of the magnetic field alone and shielding by the magnet. MOSFETs were placed inside a 2020cm{sup 2} field at a depth of 3cm in the isocentre plane in the presence and absence of the magnet. Peripheral dose measurements were done to determine the impact of the magnet on dose to the CIED in a clinical setting. These measurements were performed at the centre, under the rim and half way between a 1010cm{sup 2} field edge and the magnet with MOSFETS placed at the surface, 0.5cm and 1cm depths in the presence and absence of the magnet. Results: Infield measurements showed that effects of magnetic field on the MOSFET readings were within the 2% MOSFET dose measurement uncertainty; a 20% attenuation of dose under the magnet rim was observed. Peripheral dose measurements at the centre of the magnet show an 8% increase in surface dose and a 6% decrease in dose at 1cm depth. Dose under the magnet rim was reduced by approximately 68%, 45% and 25% for MOSFET placed at 0.0, 0.5 and 1.0cm bolus depths, respectively. Conclusions: The magnetic field has an insignificant effect on MOSFET dose measurements. Dose to the central region of CIED represented by centre of the magnet doughnut increases at the surface, and decreases at depths due to low energy scattering contributions from the magnet. Dose under the magnet rim, representing CIED edges, decreased significantly due to shielding.

  13. Orders Granting Natural Gas, LNG & CNG Authorizations Issued...

    Office of Environmental Management (EM)

    Orders Granting Natural Gas, LNG & CNG Authorizations Issued in 2014 Orders Granting Natural Gas, LNG & CNG Authorizations Issued in 2014 Order 3378 - Encana Natural Gas Inc. Order...

  14. Explosive Safety Manual, to a New Order

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-12-02

    This memorandum provides justification for the conversion of Department of Energy (DOE) Manual (M) 440.1-1A, DOE Explosives Safety Manual, dated 1-9-06, into a new DOE Order.

  15. Jamison Door: Order (2013-CE-5348)

    Broader source: Energy.gov [DOE]

    DOE ordered Jamison Door Company to pay a $6,000 civil penalty after finding Jamison Door had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  16. Goodman Manufacturing: Order (2012-CE-1509)

    Broader source: Energy.gov [DOE]

    DOE ordered Goodman Manufacturing Company L.P. to pay an $8,000 civil penalty after finding Goodman Manufacturing had failed to certify that certain room air conditioners comply with the applicable energy conservation standard.

  17. Manitowoc Foodservice: Order (2012-CE-5309)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Manitowoc Foodservice to pay an $6,000 civil penalty after finding Manitowoc Foodservice had failed to certify that Manitowoc walk-in coolers and freezers (WICFs) and their components comply with the applicable energy conservation standard.

  18. Golden Cooler: Order (2013-CE-5345)

    Broader source: Energy.gov [DOE]

    DOE ordered Golden Cooler to pay a $8,000 civil penalty after finding Golden Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  19. Consent Order EA-2005-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... With this Consent Order, Bechtel Hanford has agreed to remit a 125,000 monetary remedy, payable to the Treasurer of the United States, in accordance with the directions in the ...

  20. Prizer-Painter: Order (2014-CE-23005)

    Broader source: Energy.gov [DOE]

    DOE ordered Prizer-Painter Stove Works, Inc. to pay a $8,000 civil penalty after finding Prizer-Painter had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  1. Engineered Products: Order (2012-SE-5401)

    Broader source: Energy.gov [DOE]

    DOE ordered Engineered Products Company to pay a $480 civil penalty after finding EPCO had manufactured/privately labeled and distributed in commerce in the U.S. 19 units of basic model 15701, a metal halide lamp fixture.

  2. Peerless-Premier: Order (2014-CE-23007)

    Broader source: Energy.gov [DOE]

    DOE ordered Peerless-Premier Appliance Co. to pay a $8,000 civil penalty after finding Peerless-Premier had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  3. Dade Engineering: Order (2013-CE-5316)

    Broader source: Energy.gov [DOE]

    DOE ordered Dade Engineering Corp. to pay a $8,000 civil penalty after finding Dade Engineering had failed to certify that certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards.

  4. Southeast Cooler: Order (2013-CE-5331)

    Broader source: Energy.gov [DOE]

    DOE ordered Southeast Cooler Corp. to pay a $8,000 civil penalty after finding Southeast Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  5. Allen Co: Order (2010-CW-0715)

    Broader source: Energy.gov [DOE]

    DOE ordered Allen Co. to pay a $5,000 civil penalty after finding Allen Co. had failed to certify that certain models of faucets comply with the applicable water conservation standards.

  6. Home Depot: Order (2014-CE-32017)

    Broader source: Energy.gov [DOE]

    DOE ordered The Home Depot, Inc. to pay a $8,000 civil penalty after finding Home Depot had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  7. Mackle Company: Order (2010-SE-0106)

    Broader source: Energy.gov [DOE]

    DOE ordered Mackle Company, Inc. to pay a $27,200 civil penalty after finding the company had failed to certify that a variety of refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards.

  8. Mackle Company: Order (2011-CE-2102)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered The Mackle Company, Inc., to pay a $6,000 civil penalty after finding Mackle Co. had failed to certify that basic model D110, a clothes dryer, complies with the applicable energy conservation standards.

  9. Elmira Stove Works: Order (2011-CE-1407)

    Broader source: Energy.gov [DOE]

    DOE ordered Elmira Stove Works to pay a $6,000 civil penalty after finding Elmira Stove Works had failed to certify that certain models of refrigerator-freezers comply with the applicable energy conservation standard.

  10. ET Industries: Order (2012-SE-2902)

    Broader source: Energy.gov [DOE]

    DOE ordered ET Industries, Inc. to pay a $39,000 civil penalty after finding ET Industries had manufactured and distributed in commerce in the U.S. 974 units of basic model TH-1, a noncompliant showerhead.

  11. Polar King: Order (2013-CE-5328)

    Broader source: Energy.gov [DOE]

    DOE ordered Polar King International Inc. to pay a $8,000 civil penalty after finding Polar King had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  12. Hunter Fan: Order (2014-CE-32008)

    Broader source: Energy.gov [DOE]

    DOE ordered Hunter Fan Company to pay a $8,000 civil penalty after finding Hunter Fan had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  13. Euro Chef USA: Order (2014-CE-23004)

    Broader source: Energy.gov [DOE]

    DOE ordered Euro Chef USA Inc. to pay a $8,000 civil penalty after finding Euro Chef USA had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  14. Hudson Reed: Order (2011-SW-2909)

    Broader source: Energy.gov [DOE]

    DOE ordered Hudson Reed, Ltd. to pay a $3,000 civil penalty after finding Hudson Reed had manufactured and distributed in commerce in the U.S. 18 units of basic model HEAD16, a noncompliant showerhead.

  15. Imperial Manufacturing: Order (2013-CE-5322)

    Broader source: Energy.gov [DOE]

    DOE ordered Imperial Manufacturing, Inc. to pay a $8,000 civil penalty after finding Imperial Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  16. Royal Centurion: Order (2012-CE-3608)

    Broader source: Energy.gov [DOE]

    DOE ordered Royal Centurion, Inc., to pay a $8,000 civil penalty after finding Royal Centurion had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  17. AM Conservation: Order (2010-CW-1415)

    Broader source: Energy.gov [DOE]

    DOE ordered AM Conservation Group, Inc. to pay a $5,000 civil penalty after finding AM Conservation had failed to certify that certain models of showerheads comply with the applicable water conservation standards.

  18. ORDER 3768: PIERIDAE ENERGY (USA) LTD.

    Broader source: Energy.gov [DOE]

    OPINION AND ORDER GRANTING LONG-TERM, MULTI-CONTRACT AUTHORIZATION TO EXPORT U.S.-SOURCED NATURAL GAS BY PIPELINE TO CANADA FOR LIQUEFACTION AND RE-EXPORT IN THE FORM OF LIQUEFIED NATURAL GAS TO...

  19. USA Manufacturing: Order (2013-CE-5336)

    Broader source: Energy.gov [DOE]

    DOE ordered USA Manufacturing to pay a $8,000 civil penalty after finding USA Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  20. Task Order Awarded for Environmental Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for environmental technical services to Professional Project Services, Inc., of Oak Ridge, TN, for support services at the Paducah Gaseous Diffusion Plant located near Paducah, KY.

  1. Paragon Sales: Order (2012-CE-1417)

    Broader source: Energy.gov [DOE]

    DOE ordered Paragon Sales Co., Inc., to pay a $6,000 civil penalty after finding Paragon Sales had failed to certify that certain models of Liebherr residential freezers comply with the applicable energy conservation standards.

  2. MC Appliance: Order (2014-CE-20002)

    Broader source: Energy.gov [DOE]

    DOE ordered MC Appliance Corporation to pay a $16,000 civil penalty after finding MC Appliance had failed to certify that certain models of residential clothes washers and residential clothes dryers comply with the applicable energy conservation standards.

  3. Minka-Aire: Order (2014-CE-32018)

    Broader source: Energy.gov [DOE]

    DOE ordered Minka Lighting Inc. to pay a $8,000 civil penalty after finding Minka had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  4. Custom Coolers: Order (2013-CE-5315)

    Broader source: Energy.gov [DOE]

    DOE ordered Custom Coolers, LLC to pay a $8,000 civil penalty after finding Custom Coolers had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  5. Viking Range: Order (2014-CE-23014)

    Broader source: Energy.gov [DOE]

    DOE ordered Viking Range, LLC to pay a $8,000 civil penalty after finding Viking Range had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  6. American Range: Order (2014-CE-23006)

    Broader source: Energy.gov [DOE]

    DOE ordered American Range Corporation to pay a $8,000 civil penalty after finding American Range had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  7. Clean Cities: Coalitions in Order of Designation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Order Atlanta, GA September 8th, 1993 1 Denver, CO September 13th, 1993 2 Philadelphia, PA September 22nd, 1993 3 Delaware October 12th, 1993 4 Washington, DC October...

  8. Barclay Products: Order (2013-CW-3005)

    Broader source: Energy.gov [DOE]

    DOE ordered Barclay Products, Ltd. to pay a $8,000 civil penalty after finding Barclay Products had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  9. Ramblewood Green: Order (2014-CE-23017)

    Broader source: Energy.gov [DOE]

    DOE ordered Ramblewood Green Ltd. to pay a $8,000 civil penalty after finding Ramblewood Green had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  10. Zoe Industries: Order (2011-SW-2912)

    Broader source: Energy.gov [DOE]

    DOE ordered Zoe Industries, Inc. to pay a $25,000 civil penalty after finding Zoe had manufactured and distributed in commerce in the U.S. at least 2,235 units of basic model 150043, a noncompliant showerhead.

  11. Act One: Order (2013-CE-49001)

    Broader source: Energy.gov [DOE]

    DOE ordered Act One Communications, Inc. to pay a $8,000 civil penalty after finding Act One had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  12. K.Grill: Order (2011-SW-2902)

    Broader source: Energy.gov [DOE]

    DOE ordered Kenneth Grill to pay a $10,000 civil penalty after finding Mr. Grill had manufactured and distributed in commerce in the U.S. at least 5,000 noncompliant showerheads.

  13. Duro Corporation: Order (2014-CE-23009)

    Broader source: Energy.gov [DOE]

    DOE ordered Duro Corporation to pay a $8,000 civil penalty after finding Duro Corporation had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  14. Central Moloney: Order (2013-SE-4702)

    Broader source: Energy.gov [DOE]

    DOE ordered Central Moloney, Inc. to pay a $2,500 civil penalty after finding Central Moloney had manufactured and distributed noncompliant liquid-immersed distribution transformers in commerce in the U.S.

  15. Commercial Cooler: Order (2013-CE-5343)

    Broader source: Energy.gov [DOE]

    DOE ordered Commercial Cooler, Inc. to pay a $8,000 civil penalty after finding Commercial Cooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  16. Fisher & Paykel: Order (2014-CE-23012)

    Broader source: Energy.gov [DOE]

    DOE ordered Fisher & Paykel Appliances, Inc. to pay a $8,000 civil penalty after finding Fisher & Paykel had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  17. Aero-Tech: Order (2010-CE-1012)

    Broader source: Energy.gov [DOE]

    DOE issued an Order and closed this case against Aero-Tech Light Bulb Co., without civil penalty, after DOE found that Aero-Tech manufactured and/or privately labeled incandescent reflector lamps, but did not violate DOE regulations.

  18. Cal Flame: Order (2015-CE-14015)

    Broader source: Energy.gov [DOE]

    DOE ordered Cal Flame to pay a $8,000 civil penalty after finding Cal Flame had failed to certify that refrigerator basic model BBQ09849P-H complies with the applicable energy conservation standards.

  19. Midea Washing Appliance: Order (2011-CE-1903)

    Broader source: Energy.gov [DOE]

    DOE ordered Midea Washing Appliance Mfg. Co., Ltd. to pay a $6,000 civil penalty after finding Midea Washing Appliance had failed to certify that certain models of dishwashers comply with the applicable energy conservation standards.

  20. Penguin Toilets: Order (2010-CW-1615)

    Broader source: Energy.gov [DOE]

    DOE ordered Penguin Toilets, LLC to pay a $5,000 civil penalty after finding Penguin Toilets had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  1. Fagor America: Order (2014-CE-23018)

    Broader source: Energy.gov [DOE]

    DOE ordered Fagor America, Inc. to pay a $6,500 civil penalty after finding Fagor America had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  2. International Refrigeration: Order (2012-CE-1510)

    Broader source: Energy.gov [DOE]

    DOE ordered International Refrigeration Products to pay an $8,000 civil penalty after finding International Refrigeration had failed to certify that certain room air conditioners comply with the applicable energy conservation standard.

  3. Navien America: Order (2010-CE-1712)

    Broader source: Energy.gov [DOE]

    DOE ordered Navien America, Inc. to pay a $5,000 civil penalty after finding Navien America had failed to certify that certain models of water heaters comply with the applicable energy conservation standards.

  4. Minibar North America: Order (2014-CE-14010)

    Broader source: Energy.gov [DOE]

    DOE ordered Minibar North America, Inc. to pay a $8,000 civil penalty after finding Minibar had failed to certify that certain models of refrigerators comply with the applicable energy conservation standards.

  5. Fagor America: Order (2013-CEW-19001)

    Broader source: Energy.gov [DOE]

    DOE ordered Fagor America, Inc. to pay a $13,000 civil penalty after finding Fagor America had failed to certify that certain models of residential refrigerator-freezers and dishwashers comply with the applicable energy and water conservation standards.

  6. AGA Marvel: Order (2011-CE-1905)

    Broader source: Energy.gov [DOE]

    DOE ordered AGA Marvel to pay a $6,000 civil penalty after finding AGA Marvel had failed to certify that certain models of dishwashers comply with the applicable energy conservation standards.

  7. Anthony International: Order (2013-CE-5357)

    Broader source: Energy.gov [DOE]

    DOE ordered Anthony International to pay a $8,000 civil penalty after finding Anthony International had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  8. Capital Cooking: Order (2014-CE-23008)

    Broader source: Energy.gov [DOE]

    DOE ordered Capital Cooking Equipment, Inc. to pay a $8,000 civil penalty after finding Capital Cooking had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  9. Artisan Manufacturing: Order (2010-CW-0712)

    Broader source: Energy.gov [DOE]

    DOE ordered Artisan Manufacturing Company, Inc., to pay a $5,000 civil penalty after finding Artisan Manufacturing had failed to certify that certain models of faucets comply with the applicable water conservation standard.

  10. Refrigerator Manufacturers: Order (2013-CE-5341)

    Broader source: Energy.gov [DOE]

    DOE ordered Refrigerator Manufacturers, LLC to pay a $8,000 civil penalty after finding Refrigerator Manufacturers had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  11. Cospolich Refrigerator: Order (2013-CE-5314)

    Broader source: Energy.gov [DOE]

    DOE ordered Cospolich Refrigerator Co, Inc. to pay a $8,000 civil penalty after finding Cospolich Refrigerator had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  12. Purcell-Murray: Order (2014-CE-23019)

    Broader source: Energy.gov [DOE]

    DOE ordered Purcell-Murray Company, Inc. to pay a $8,000 civil penalty after finding Purcell-Murray had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  13. Living Direct: Order (2011-CE-1904)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Living Direct, Inc. to pay a $6,000 civil penalty after finding Living Direct had failed to certify that certain models of dishwashers, refrigerator-freezers and freezers comply with the applicable energy conservation standards.

  14. ORDER NO. 3465: LNG DEVELOPMENT COMPANY, LLC

    Broader source: Energy.gov [DOE]

    ORDER CONDITIONALLY GRANTING LONG-TERM MULTI-CONTRACT AUTHORIZATION TO EXPORT LIQUEFIED NATURAL GAS BY VESSEL FROM THE OREGON LNG TERMINAL IN WARRENTON, CLATSOP COUNTY, OREGON TO NON-FREE TRADE AGREEMENT NATIONS

  15. DOE - Fossil Energy: Orders Issued in 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Import LNG from Various International Sources by Vessel 3082 FE12-24-LNG 040512 Prometheus Energy Group Order Granting Blanket Authority to ImportExport LNG fromto Canada by...

  16. Nostalgia Products: Order (2014-CE-14017)

    Broader source: Energy.gov [DOE]

    DOE ordered Nostalgia Products Group, LLC to pay a $8,000 civil penalty after finding Nostalgia Products had failed to certify that certain models of refrigerators and refrigerator-freezers comply with the applicable energy conservation standards.

  17. National Comfort Products: Order (2010-SE-0307)

    Broader source: Energy.gov [DOE]

    DOE ordered National Comfort Products to pay an $8,000 civil penalty after finding NCP had failed to conduct the required testing to certify that certain models of central air conditioners comply with the applicable energy conservation standard.

  18. Basement Systems: Order (2010-CE-2110)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with Basement Systems, Inc. after finding Basement Systems had failed to certify that certain models of dehumdifiers comply with the applicable energy conservation standards.

  19. Acme Kitchenettes: Order (2011-CE-1406)

    Broader source: Energy.gov [DOE]

    DOE ordered Acme Kitchenettes Corp. to pay a $6,000 civil penalty after finding Acme Kitchenettes had failed to certify that certain models of refrigerators comply with the applicable energy conservation standards.

  20. Excellence Opto: Order (2013-CE-49002)

    Broader source: Energy.gov [DOE]

    DOE ordered Excellence Opto, Inc. to pay a $8,000 civil penalty after finding Excellence Opto had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

  1. Heat Controller: Order (2011-CE-1507)

    Broader source: Energy.gov [DOE]

    DOE ordered Heat Controller, Inc. to pay a $6,000 civil penalty after finding Heat Controller had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

  2. Exploring intertwined orders in cuprate superconductors (Journal...

    Office of Scientific and Technical Information (OSTI)

    YBa2Cu3O6+x and La2-xBaxCuO4, the maximum ordering strength is peaked at the hole concentration of 18 in both cases. There are also possible connections more with the quantum...

  3. Distinctive Appliances: Order (2014-CE-23020)

    Broader source: Energy.gov [DOE]

    DOE ordered Distinctive Appliances Distributing, Inc. to pay a $8,000 civil penalty after finding Distinctive Appliances had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  4. BSH Home Appliances: Order (2014-CE-23013)

    Broader source: Energy.gov [DOE]

    DOE ordered BSH Home Appliances Corporation to pay a $12,000 civil penalty after finding BSH Home Appliances had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

  5. Volume International: Order (2014-CE-32014)

    Broader source: Energy.gov [DOE]

    DOE ordered Volume International Corporation to pay a $8,000 civil penalty after finding Volume International had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  6. Hisense USA: Order (2010-CE-1211)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE issued an Order after entering into a Compromise Agreement with Hisense USA Corp. after finding Hisense USA had failed to certify that certain models of residential refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards.

  7. Kold Pack: Order (2013-CE-5323)

    Broader source: Energy.gov [DOE]

    DOE ordered Kold Pack, Inc. to pay a $8,000 civil penalty after finding Kold Pack had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  8. Bull Outdoor Products: Order (2015-CE-14014)

    Broader source: Energy.gov [DOE]

    DOE ordered Bull Outdoor Products, Inc. to pay a $8,000 civil penalty after finding Bull had failed to certify that refrigerator basic model BC-130 complies with the applicable energy conservation standards.

  9. HKC-US: Order (2013-SE-33002)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered HKC-US, LLC to pay a $6,500 civil penalty after finding HKC-US had failed to certify that one basic model of ceiling fan light kit complies with the applicable energy conservation standards.

  10. GE Appliances: Order (2010-CE-2113)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with General Electric Appliances after finding GE Appliances had failed to certify that certain models of dehumidifiers comply with the applicable energy conservation standards.

  11. Quietside Corp: Order (2010-CE-1710)

    Broader source: Energy.gov [DOE]

    DOE ordered Quietside Corporation to pay a $5,000 civil penalty after finding Quietside Corp. had failed to certify that certain models of water heaters comply with the applicable energy conservation standards.

  12. American Valve: Order (2010-CW-1411)

    Broader source: Energy.gov [DOE]

    DOE ordered American Valve, Inc. to pay a $5,000 civil penalty after finding American Valve had failed to certify that certain showerhead models comply with the applicable water conservation standards.

  13. Executive Order 13007 Indian Sacred Sites (1996)

    Broader source: Energy.gov [DOE]

    Executive Order 13007 Indian Sacred Sites (1996). Designed to protect and preserve Indian religious practices, this EO directs each federal agency that manages federal lands to “(1) accommodate...

  14. Orderings for incomplete factorization preconditioning of nonsymmetric

    Office of Scientific and Technical Information (OSTI)

    problems (Journal Article) | SciTech Connect Orderings for incomplete factorization preconditioning of nonsymmetric problems Citation Details In-Document Search Title: Orderings for incomplete factorization preconditioning of nonsymmetric problems Numerical experiments are presented whereby the effect of reorderings on the convergence of preconditioned Krylov subspace methods for the solution of nonsymmetric linear systems is shown. The preconditioners used in this study are different

  15. O:ELECTRICDETROITPP-230-Order.PDF

    Energy Savers [EERE]

    INTERNATIONAL TRANSMISSION COMPANY ORDER NO. PP-230 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order (EO) 10485, as amended by EO 12038, which requires the issuance of Presidential permits for the construction, operation, maintenance, or connection of electric transmission facilities at the United States international border. There are four international electric transmission lines that interconnect

  16. Historical - Executive Order 11988 (1977): Floodplain Management |

    Energy Savers [EERE]

    Department of Energy Executive Order 11988 (1977): Floodplain Management Historical - Executive Order 11988 (1977): Floodplain Management Issued in 1977 to avoid to the extent possible the long and short term adverse impacts associated with the occupancy and modification of floodplains and to avoid direct or indirect support of floodplain development wherever there is a practicable alternative. This E.O. was amended by E.O. 13690. See the amended E.O. at: http://energy.gov/node/1446141.

  17. Consent Order EA-2005-01

    Office of Environmental Management (EM)

    20585 July 28, 2005 Mr. T. E. Logan, President Bechtel Hanford, Inc. 3070 George Washington Way Richland, WA 99352 Consent Order 2005-01 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Bechtel Hanford, Inc. Dear Mr. Logan: The Department of Energy (DOE) has reviewed Bechtel Hanford, Inc.'s (Bechtel Hanford) investigation and supporting documentation associated with two events occurring at the 618-2 Burial Ground in December 2004. These events resulted in

  18. HODIF:High-Order Discretizations, Interpolations and

    Energy Science and Technology Software Center (OSTI)

    2006-06-20

    This software, a library, contains FORTRAN77 subroutines to calculate first and second derivatives up to 8th order, interpolations (1D and 2D) up to 10th order and filters up to 14th order. Only even orders are addressed and finite-difference stencils are implemented on a vertex-centered mesh. The primary aim of this library is to be used in block-structured adaptive mesh simulations where high order is desired. The interpolants in this library are essentially designed to domore » prolongations and restrictions between levels of rfinement - however, they assume that the refinement ratio is 2. The filters are provided to remove high wavenumber content from solutions in case Runge phenomenon occurs - a common occurrence in case of marginal resolution of the solution. Details of the derivation and use are to be found in "Using high-order methods on adaptively refined block-structured meshes - discretizations, interpolations and filters", by J. Ray, C.A. Kennedy, S. Lefantzi and H.N. Najm, Sandia Technical Report, SAND2005-7981. The software comes with a User's Guide and examples how to use it.« less

  19. C:\Documents and Settings\tayloroa\Local Settings\Temporary Internet Files\OLK9\ea-274.PDF

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wisconsin Public Service Corporation Order No. EA-274 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On November 28, 2002, Wisconsin Public Service Corporation (WPSC) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. WPSC is an investor-owned

  20. Fe-based long range ordered alloys

    DOE Patents [OSTI]

    Liu, C.T.

    Malleable long range ordered alloys with high critical ordering temperatures exist in the V(Co,Fe)/sub 3/ and V(Co,Fe,Ni)/sub 3/ system. The composition comprising by weight 22 to 23% V, 35 to 50% Fe, 0 to 22% Co and 19 to 40% Ni with an electron density no greater than 8.00. Excellent high temperature properties occur in alloys having compositions comprising by weight 22 to 23% V, 35 to 45% Fe, 0 to 10% Co, 25 to 35% Ni; 22 to 23% V, 28 to 33% Ni and the remainder Fe; and 22 to 23% V, 19 to 22% Co and the remainder Fe. The alloys are fabricable by casting, deforming and annealing for sufficient time to provide ordered structure.

  1. Fe-based long range ordered alloys

    DOE Patents [OSTI]

    Liu, Chain T; Inouye, Henry; Schaffhauser, Anthony C.

    1980-01-01

    Malleable long range ordered alloys having high critical ordering temperatures exist in the V(Co,Fe).sub.3 and V(Co,Fe,Ni).sub.3 system having the composition comprising by weight 22-23% V, 35-50% Fe, 0-22% Co and 19-40% Ni with an electron density no greater than 8.00. Excellent high temperature properties occur in alloys having compositions comprising by weight 22-23% V, 35-45% Fe, 0-10% Co, 25-35% Ni; 22-23% V, 28-33% Ni and the remainder Fe; and 22-23% V, 19-22% Ni, 19-22% Co and the remainder Fe. The alloys are fabricable by casting, deforming and annealing for sufficient time to provide ordered structure.

  2. General Restaurant Equipment: Order (2013-CE-5344)

    Broader source: Energy.gov [DOE]

    DOE ordered General Restaurant Equipment Co. to pay a $8,000 civil penalty after finding General Restaurant Equipment had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  3. Mile High: Order (2012-SE-4501)

    Broader source: Energy.gov [DOE]

    DOE ordered Mile High Equipment, LLC to pay a $17,525 civil penalty after finding Mile High had manufactured and distributed in commerce in the U.S. approximately 109 units of lce-O-Matic brand automatic commercial ice maker basic model ICE2106 FW, HW, a noncompliant product.

  4. Lutron Electronics: Order (2012-SE-3796)

    Broader source: Energy.gov [DOE]

    DOE ordered Lutron Electronics Co., Inc. to pay a $13,000 civil penalty after finding Lutron Electronics had manufactured and distributed in commerce in the U.S. at least 79,000 units of various basic models, noncompliant Class A external power supplies.

  5. Commercial Refrigerator Door: Order (2013-CE-5351)

    Broader source: Energy.gov [DOE]

    DOE ordered Commercial Refrigerator Door Company, Inc. to pay a $8,000 civil penalty after finding Commercial Refrigerator Door had failed to certify that a variety of models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  6. Metl-Span: Order (2013-CE-5352)

    Broader source: Energy.gov [DOE]

    DOE ordered Metl-Span LLC to pay a $8,000 civil penalty after finding Metl-Span had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  7. R-Cold: Order (2013-CE-5354)

    Broader source: Energy.gov [DOE]

    DOE ordered R-Cold, Inc. to pay a $8,000 civil penalty after finding R-Cold had failed to certify that any basic models of walk-in cooler or freezer components comply with the applicable energy conservation standards.

  8. Schott Gemtron: Order (2013-CE-5358)

    Broader source: Energy.gov [DOE]

    DOE ordered Schott Gemtron Corp. to pay a $6,000 civil penalty after finding Schott Gemtron had failed to certify that the Kodiak model line of walk-in cooler and freezer doors complies with the applicable energy conservation standards.

  9. PermaTherm: Order (2013-CE-5356)

    Broader source: Energy.gov [DOE]

    DOE ordered PermaTherm, Inc. to pay a $8,000 civil penalty after finding PermaTherm had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  10. Diversified Panel Systems: Order (2013-CE-5346)

    Broader source: Energy.gov [DOE]

    DOE ordered Diversified Panel Systems, Inc. to pay a $8,000 civil penalty after finding Diversified Panel Systems had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  11. American Standard: Order (2013-CW-3001)

    Broader source: Energy.gov [DOE]

    DOE ordered AS America, Inc., d/b/a American Standard Brands to pay a $8,000 civil penalty after finding American Standard had failed to certify that certain models of water closets comply with the applicable water conservation standards.

  12. GE Lighting Solutions: Order (2013-SE-4901)

    Broader source: Energy.gov [DOE]

    DOE ordered General Electric Lighting Solutions, LLC to pay a $5,360 civil penalty after finding GE Lighting Solutions had manufactured and distributed in commerce in the U.S. 30 units of basic model DR4-RTFB-23B and 177 units (of which 85 units remain in inventory) of basic model DR4-RTFB-77A-002, noncompliant traffic signal modules.

  13. Watermark Designs: Order (2010-CW-1404)

    Broader source: Energy.gov [DOE]

    DOE ordered Watermark Designs Holdings, Ltd. d/b/a Watermark Designs, Ltd. to pay a $135,104 civil penalty after finding Watermark Designs had failed to certify that various models of showerheads comply with the applicable water conservation standards.

  14. Golden Opportunity: Order (2014-CE-20003)

    Broader source: Energy.gov [DOE]

    DOE ordered Golden Opportunity, Inc. to pay a $8,000 civil penalty after finding Golden Opportunity had failed to certify that certain models of room air conditioners, central air conditioners/heat pumps, and residential clothes washers comply with the applicable energy conservation standards.

  15. Advance Energy Technologies: Order (2013-CE-5302)

    Broader source: Energy.gov [DOE]

    DOE ordered Advance Energy Technologies, Inc., to pay a $8,000 civil penalty after finding Advance Energy Technologies had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standard.

  16. American Cooler Technologies: Order (2013-CE-5305)

    Broader source: Energy.gov [DOE]

    DOE ordered American Cooler Technologies to pay a $8,000 civil penalty after finding American Cooler Technologies had failed to certify that certain models of walk-in coolers or freezers (WICF) components comply with the applicable energy conservation standards.

  17. Thermo Products: Order (2011-SE-1603)

    Broader source: Energy.gov [DOE]

    DOE ordered Thermo Products, LLC, to pay a $6,000 civil penalty after finding Thermo Products had failed to conduct the required testing to certify that certain models of central air conditioning heat pumps comply with the applicable energy conservation standard.

  18. Kingspan Insulated Panels: Order (2013-CE-5353)

    Broader source: Energy.gov [DOE]

    DOE ordered Kingspan Insulated Panels, Inc. to pay a $8,000 civil penalty after finding Kingspan Insulated Panels had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  19. Ingersoll-Rand: Order (2012-SE-1608)

    Broader source: Energy.gov [DOE]

    DOE ordered Ingersoll-Rand to pay a $800 civil penalty after finding Ingersoll-Rand had manufactured and distributed in commerce in the U.S. four units of basic model 2TTA0060A4000C, a noncompliant central air conditioner.

  20. Commercial Display Systems: Order (2013-CE-5350)

    Broader source: Energy.gov [DOE]

    DOE ordered Commercial Display Systems, LLC to pay a $8,000 civil penalty after finding Commercial Display Systems had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  1. Royal Pacific: Order (2013-SE-33004)

    Broader source: Energy.gov [DOE]

    DOE ordered Royal Pacific, Ltd. to pay a $8,000 civil penalty after finding Royal Pacific had failed to certify that various basic models of medium base compact fluorescent lamps, ceiling fans, ceiling fan light kits, and illuminated exit signs comply with the applicable energy conservation standards.

  2. MC Appliance: Order (2012-CE-1508)

    Broader source: Energy.gov [DOE]

    DOE ordered CNA International Inc. d/b/a MC Appliance Corporation to pay a $8,000 civil penalty after finding MC Appliance had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

  3. Heat Controller: Order (2014-SE-15004)

    Broader source: Energy.gov [DOE]

    DOE ordered Heat Controller, Inc. to abide by the terms of a February 11, 2014 Notice of Noncompliance Determination, after finding Heat Controller had privately labeled and distributed in commerce in the U.S. at least 7,314 noncompliant units of Comfort-Aire branded room air conditioner models CGREG-81H and REG-81J.

  4. Duracold Refrigeration Manufacturing: Order (2013-CE-5342)

    Broader source: Energy.gov [DOE]

    DOE ordered Duracold Refrigeration Manufacturing Company, LLC to pay a $8,000 civil penalty after finding Duracold Refrigeration Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  5. North Star Refrigerator: Order (2013-CE-5355)

    Broader source: Energy.gov [DOE]

    DOE ordered North Star Refrigerator Co., Inc. to pay a $8,000 civil penalty after finding North Star Refrigerator had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  6. Mueller Streamline: Order (2011-SW-2802)

    Broader source: Energy.gov [DOE]

    DOE ordered Mueller Streamline Co. to pay a $25,000 civil penalty after finding Mueller Streamline had privately labeled and distributed in commerce in the U.S. approximately 17,412 units of model 120-003NL noncompliant faucets.

  7. Matthews Fan: Order (2014-CE-32012)

    Broader source: Energy.gov [DOE]

    DOE ordered Matthews-Gerbar, Ltd. d/b/a Matthews Fan Company to pay a $8,000 civil penalty after finding Matthews had failed to certify that certain models of ceiling fans comply with the applicable energy conservation standards.

  8. Nordyne: Order (2010-CE-01/0210)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Nordyne, LLC d/b/a Garrison Heating and Cooling Products to pay a $10,000 civil penalty after finding Nordyne had failed to certify that certain models of central air conditioners and central air conditioning heat pumps comply with the applicable energy conservation standard.

  9. Sanden Vendo America: Order (2014-SE-52002)

    Broader source: Energy.gov [DOE]

    DOE ordered Sanden Vendo America Inc. to pay a $6,200 civil penalty after finding Sanden Vendo America had manufactured and distributed in commerce in the U.S. 31 units of Class A refrigerated bottled or canned beverage vending machine model Vue30 (with 1128127 cassette refrigeration deck), a noncompliant product.

  10. Exploring intertwined orders in cuprate superconductors

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Tranquada, John M.

    2014-11-22

    In this study, the concept of intertwined orders has been introduced to describe the cooperative relationship between antiferromagnetic spin correlations and electron (or hole) pair correlations that develop in copper-oxide superconductors. This contrasts with systems in which, for example, charge-density-wave (CDW) order competes for Fermi surface area with superconductivity. La2-xBaxCuO4 with x = 0.125 provides an example in which the ordering of spin stripes coincides with the onset of two-dimensional superconducting correlations. The apparent frustration of the interlayer Josephson coupling has motivated the concept of the pair-density-wave superconductor, a state that theoretical calculations show to be energetically competitive with themore » uniform d-wave superconductor. Even at x = 0.095, where there is robust superconductivity below 32 K in zero field, the coexistence of strong, low-energy, incommensurate spin excitations implies a spatially modulated and intertwined pair wave function. Recent observations of CDW order in YBa2Cu3O6+x and other cuprate families have raised interesting questions regarding the general role of charge modulations and the relation to superconductivity. While there are differences in the doping dependence of the modulation wave vectors in YBa2Cu3O6+x and La2-xBaxCuO4, the maximum ordering strength is peaked at the hole concentration of 1/8 in both cases. There are also possible connections with the quantum oscillations that have been detected about the same hole concentration but at high magnetic fields. Resolving these relationships remains a research challenge.« less

  11. Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS | Department of Energy

    Energy Savers [EERE]

    Order 422.1, CONDUCT OF OPERATIONS Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS The general approach to implementing DOE O 422.1 is for contractors to develop, for DOE line management approval, documentation demonstrating implementation of the requirements in the contractor requirements document (CRD). DOE line management means the Federal officials such as Secretarial Officers and heads of field elements responsible for DOE facilities and operations. It is necessary to provide a conduct

  12. Short range smectic order driving long range nematic order: Example of cuprates

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Markiewicz, R. S.; Lorenzana, J.; Seibold, G.; Bansil, A.

    2016-01-27

    We present a model for describing the combined presence of nematic and ‘smectic’ or stripe-like orders seen in recent scanning tunneling microscopy (STM) experiments on cuprates. The smectic order is treated as an electronic charge density wave with an associated Peierls distortion or a ‘Pomeranchuk wave’. This primary order is restricted to nanoscale domains by disorder effects, while the secondary coupling to strain generates the nematic order with a considerably longer range. Lastly, a variety of experimental results are shown to be consistent with our theoretical predictions.

  13. Ordered transport and identification of particles

    DOE Patents [OSTI]

    Shera, E.B.

    1993-05-11

    A method and apparatus are provided for application of electrical field gradients to induce particle velocities to enable particle sequence and identification information to be obtained. Particle sequence is maintained by providing electroosmotic flow for an electrolytic solution in a particle transport tube. The transport tube and electrolytic solution are selected to provide an electroosmotic radius of >100 so that a plug flow profile is obtained for the electrolytic solution in the transport tube. Thus, particles are maintained in the same order in which they are introduced in the transport tube. When the particles also have known electrophoretic velocities, the field gradients introduce an electrophoretic velocity component onto the electroosmotic velocity. The time that the particles pass selected locations along the transport tube may then be detected and the electrophoretic velocity component calculated for particle identification. One particular application is the ordered transport and identification of labeled nucleotides sequentially cleaved from a strand of DNA.

  14. Environmental embrittlement in ordered intermetallic alloys

    SciTech Connect (OSTI)

    Liu, C.T.; Stoloff, N.S.

    1992-12-31

    Ordered intermetallics based on aluminides and silicides possess many promising properties for elevated-temperature applications; however, poor fracture resistance and limited fabricability restrict their use as engineering material. Recent studies have shown that environmental embrittlement is a major cause of low ductility and brittle fracture in many ordered intermetallic alloys. There are two types of environmental embrittlement observed in intermetallic alloys. One is hydrogen-induced embrittlement occurring at ambient temperatures in air. The other is oxygen-induced embrittlement in oxidizing atmospheres at elevated temperatures. In most cases, the embrittlements are due to a dynamic effect involving generation and penetration of embrittling agents (i.e., hydrogen or oxygen ) during testing. Diffusion of embrittling agents plays a dominant role in fracture of these intermetallic alloys. This chapter summarizes recent progress in understanding and reducing environmental embrittlement in these alloys.

  15. Ordered organic-organic multilayer growth

    DOE Patents [OSTI]

    Forrest, Stephen R; Lunt, Richard R

    2015-01-13

    An ordered multilayer crystalline organic thin film structure is formed by depositing at least two layers of thin film crystalline organic materials successively wherein the at least two thin film layers are selected to have their surface energies within .+-.50% of each other, and preferably within .+-.15% of each other, whereby every thin film layer within the multilayer crystalline organic thin film structure exhibit a quasi-epitaxial relationship with the adjacent crystalline organic thin film.

  16. Optical waveguides having flattened high order modes

    DOE Patents [OSTI]

    Messerly, Michael Joseph; Beach, Raymond John; Heebner, John Edward; Dawson, Jay Walter; Pax, Paul Henry

    2014-08-05

    A deterministic methodology is provided for designing optical fibers that support field-flattened, ring-like higher order modes. The effective and group indices of its modes can be tuned by adjusting the widths of the guide's field-flattened layers or the average index of certain groups of layers. The approach outlined here provides a path to designing fibers that simultaneously have large mode areas and large separations between the propagation constants of its modes.

  17. AeroSys: Order (2011-SCE-1624)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered AeroSys, Inc. (AeroSys) to pay a $100,000 civil penalty after finding AeroSys had (1) failed to certify that certain models of space-constrained central air conditioners and air conditioning heat pumps comply with the applicable energy conservation standards; and (2) manufactured and distributed in commerce in the U.S. units of noncompliant models of space-constrained central air conditioners and air conditioning heat pumps.

  18. Battelle Consent Order (WCO-2014-01)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20585 October 24, 2014 Mr. Michael Kluse Laboratory Director Battelle Memorial Institute Pacific Northwest National Laboratory 790 6th Street MSIN: K1-46 Richland, Washington 99354 WCO-2014-01 Dear Mr. Kluse: This letter transmits the consent order between the Office of Enterprise Assessments' Office of Enforcement and Battelle Memorial Institute (Battelle) to resolve the Department of Energy's (DOE) investigation into the deficiencies identified by Battelle related to the Pacific Northwest

  19. Consent Order EA-2000-10

    Office of Environmental Management (EM)

    Mr. Robert P. Heck, II [ ] Fluor Federal Services P.O. Box 1050 MSIN: B7-50 Richland, WA 99352 EA-2000-10 Subject: Consent Order Incorporating Agreement between U. S. Department of Energy and Fluor Federal Services Dear Mr. Heck: This letter refers to the Department of Energy's (DOE) evaluation of two internal investigations conducted by Fluor Hanford, Inc. and CH2M Hanford Group, Inc. in which Fluor Federal Services (FFS) jointly participated. Collectively, the two investigations examined the

  20. FEMA - Executive Order11988 - Floodplain Management 1977 | Open...

    Open Energy Info (EERE)

    Order11988 - Floodplain Management 1977 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Executive OrderExecutive Order: FEMA - Executive...

  1. Guidance on Meeting Executive Order 13693 Water Provisions |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Efficiency Guidance on Meeting Executive Order 13693 Water Provisions Guidance on Meeting Executive Order 13693 Water Provisions Executive Order (E.O.) 13693 became ...

  2. Archaeological investigations at a toolstone source area and temporary camp: Sample Unit 19-25, Nevada Test Site, Nye County, Nevada. Technical report No. 77

    SciTech Connect (OSTI)

    Jones, R.C.; DuBarton, A.; Edwards, S.; Pippin, L.C.; Beck, C.M.

    1993-12-31

    Archaeological investigations were initiated at Sample Unit 19--25 to retrieve information concerning settlement and subsistence data on the aboriginal hunter and gatherers in the area. Studies included collection and mapping of 35.4 acres at site 26NY1408 and excavation and mapping of 0.02 acres at site 26NY7847. Cultural resources include two rock and brush structures and associated caches and a large lithic toolstone source area and lithic artifact scatter. Temporally diagnostic artifacts indicate periodic use throughout the last 12,000 years; however dates associated with projectile points indicate most use was in the Middle and Late Archaic. Radiocarbon dates from the rock and brush structures at site 26NY7847 indicate a construction date of A.D. 1640 and repair between A.D. 1800 and 1950 for feature 1 and between A.D. 1330 and 1390 and repair at A.D. 1410 for feature 2. The dates associated with feature 2 place its construction significantly earlier than similar structures found elsewhere on Pahute Mesa. Activity areas appear to reflect temporary use of the area for procurement of available lithic and faunal resources and the manufacture of tools.

  3. Novel Use of Water Soluble "Aquapour" As A Temporary Spacer During Coil Winding For The NSTX-U Centerstack

    SciTech Connect (OSTI)

    Mardenfeld, Michael

    2013-07-01

    A major facility upgrade to the National Spherical Torus eXperiment (NSTX-U) is currently underway at Princeton Plasma Physics Laboratory (PPPL). A key component of NSTX-U is the fabrication of a new, higher field centerstack (CS). In order to simultaneously provide robust joints between the inner and outer legs of the Toroidal Field Coils (TF) and minimize radial build, the NSTX-U CS design requires that the Ohmic Heating solenoid (OH) be wound directly on the inner TF bundle. To protect the OH against thermal expansion stress during scenarios where the inner TF bundle is hot but the OH is relatively cool, the completed CS will have a 0.100 inch annular gap between the outer diameter of the TF bundle and the inner diameter of the OH solenoid. "Aquapour", a proprietary material produced by the Advanced Ceramics Manufacturing Company will be used during manufacture to produce this gap. After the TF bundle is vacuum pressure impregnated and cured, a cylindrical "clam shell" mold will be assembled around it, and a slurry of powdered Aquapour and water will be pumped into the annular space between the mold and TF bundle. Subsequent baking will turn the Aquapour solid, and a protective layer of wet lay-up fiberglass and resin will be added. The OH solenoid will be wound directly on this wet lay-up shell. After vacuum pressure impregnation of the OH, the water soluble Aquapour will be washed away, leaving the required radial clearance between the TF and OH. This paper will describe prototyping and testing of this process, and plans for use on the actual CS fabrication.

  4. 1, THIS CONIRACT IS A RATED ORDER

    Office of Environmental Management (EM)

    ,/OTHER 1, THIS CONIRACT IS A RATED ORDER UNDER DPAS 115 CFR 350} 3, EFFECTIVE DATE 12/22/2009 10, SUBMIT INVOICES ffî',1:ïïiï:3'1".ïäfuî"ñ'*" I ntinued AWARD/CONTRACT 2. CONTRACT (Proc. lnst. /denf.) NO DE-Cr0000004 - ISSUED BY -|{CBC * Springdale U. S. Department of Energy EM Consolidated Business Center 175 Tri-County Park\^Iay Springdale OH 45246-3222 7. NAME AND ADDRESS OF CONTRACTOR (No., Street, C¡ty, Country, State and ZIP Çode) V,IASTREN - ENERGX MISSION

  5. Consent Order of Dismissal, Section III

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SRR-ESH-2015-00110 Revision 1 Post Date: February 29, 2016 Page 1 of 6 Z-Area Saltstone Disposal Facility Permit General Condition B.5.a-h Information and Consent Order of Dismissal, Section III.7 Permit Condition Requirement Estimated Value Updated Value Comments B.5 a) Cumulative process volume of salt waste disposed to date Not Applicable 10, 722 kgal Vault 4, Cells B, D, E, F, H, J, K, L SDU 2, Cells 2A and 2B SDU 5, Cells 5A and 5B b) Process volume of saltstone grout disposed and

  6. Consent Order of Dismissal, Section III

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 SRR-ESH-2016-00025 Revision 0 Post Date: February 29, 2016 Page 1 of 6 Z-Area Saltstone Disposal Facility Permit General Condition B.5.a-h Information and Consent Order of Dismissal, Section III.7 Permit Condition Requirement Estimated Value Updated Value Comments B.5 a) Cumulative process volume of salt waste disposed to date Not Applicable 10, 744 kgal SDU 4, Cells B, D, E, F, H, J, K, L SDU 2, Cells A and B SDU 5, Cells A and B b) Process volume of saltstone grout disposed and

  7. CATERING ORDER;SA 4500-CCC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4500-CCC (4-2015) Supersedes (11-2014) issue CATERING ORDER Your Name: ____ I certify that I have Completed and had my Manager complete: FIN100.1.TNT.6 Obtain Business Meeting Meal and Refreshment Approval procedure. Phone: Date of Delivery: Charging Organization # / Purpose: Project: Task: Delivery Location (Building/Room): Number of attendees to be served: A.M. Service Time: P.M. Service Time: Lunch Service Time: * A replacement fee will be charged if equipment is missing or not returned in 24

  8. O:\ELECTRIC\ORDERS\EA-223.PDF

    Energy Savers [EERE]

    CMS Marketing, Services and Trading Company Order No. EA-223 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 12, 2000, CMS Marketing, Services and Trading Company (CMS MS&T) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. CMS

  9. Consent Order EA-2000-07

    Office of Environmental Management (EM)

    1, 2000 Dr. Benjamin Pellegrini [ ] Mason & Hanger Corporation P.O. Box 30020 Amarillo, TX 79120-0020 EA 2000-07 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Mason & Hanger Corporation Dear Dr. Pellegrini: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances presented to DOE by Mason & Hanger Corporation's (M&H or the contractor) internal evaluation of the Building 12-79 HPFL Valve Misposition at

  10. Consent Order EA-2000-09

    Office of Environmental Management (EM)

    Ms. M. P. Delozier [ ] CH2M Hill Hanford Group, Inc. MSIN: H6-08 2440 Stevens Center Richland, WA 99352 EA-2000-09 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and CH2M Hill Hanford Group, Inc. Dear Ms. Delozier: This letter refers to the Department of Energy's (DOE) evaluation of an internal investigation conducted by CH2M Hill Group, Inc. (CHG) in February 2000. The investigation examined the facts and circumstances surrounding quality problems with the

  11. Magnetic and charge ordering in nanosized manganites

    SciTech Connect (OSTI)

    Zhang, T. Wang, X. P.; Fang, Q. F.; Li, X. G.

    2014-09-15

    Perovskite manganites exhibit a wide range of functional properties, such as colossal magneto-resistance, magnetocaloric effect, multiferroic property, and some interesting physical phenomena including spin, charge, and orbital ordering. Recent advances in science and technology associated with perovskite oxides have resulted in the feature sizes of microelectronic devices down-scaling into nanoscale dimensions. The nanoscale perovskite manganites display novel magnetic and electronic properties that are different from their bulk and film counterparts. Understanding the size effects of perovskite manganites at the nanoscale is of importance not only for the fundamental scientific research but also for developing next generation of electronic and magnetic nanodevices. In this paper, the current understanding and the fundamental issues related to the size effects on the magnetic properties and charge ordering in manganites are reviewed, which covers lattice structure, magnetic and electronic properties in both ferromagnetic and antiferromagnetic based manganites. In addition to review the literatures, this article identifies the promising avenues for the future research in this area.

  12. Hybrid reduced order modeling for assembly calculations

    SciTech Connect (OSTI)

    Bang, Y.; Abdel-Khalik, H. S.; Jessee, M. A.; Mertyurek, U.

    2013-07-01

    While the accuracy of assembly calculations has considerably improved due to the increase in computer power enabling more refined description of the phase space and use of more sophisticated numerical algorithms, the computational cost continues to increase which limits the full utilization of their effectiveness for routine engineering analysis. Reduced order modeling is a mathematical vehicle that scales down the dimensionality of large-scale numerical problems to enable their repeated executions on small computing environment, often available to end users. This is done by capturing the most dominant underlying relationships between the model's inputs and outputs. Previous works demonstrated the use of the reduced order modeling for a single physics code, such as a radiation transport calculation. This manuscript extends those works to coupled code systems as currently employed in assembly calculations. Numerical tests are conducted using realistic SCALE assembly models with resonance self-shielding, neutron transport, and nuclides transmutation/depletion models representing the components of the coupled code system. (authors)

  13. Adaptive h -refinement for reduced-order models: ADAPTIVE h -refinement for reduced-order models

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Carlberg, Kevin T.

    2014-11-05

    Our work presents a method to adaptively refine reduced-order models a posteriori without requiring additional full-order-model solves. The technique is analogous to mesh-adaptive h-refinement: it enriches the reduced-basis space online by ‘splitting’ a given basis vector into several vectors with disjoint support. The splitting scheme is defined by a tree structure constructed offline via recursive k-means clustering of the state variables using snapshot data. This method identifies the vectors to split online using a dual-weighted-residual approach that aims to reduce error in an output quantity of interest. The resulting method generates a hierarchy of subspaces online without requiring large-scale operationsmore » or full-order-model solves. Furthermore, it enables the reduced-order model to satisfy any prescribed error tolerance regardless of its original fidelity, as a completely refined reduced-order model is mathematically equivalent to the original full-order model. Experiments on a parameterized inviscid Burgers equation highlight the ability of the method to capture phenomena (e.g., moving shocks) not contained in the span of the original reduced basis.« less

  14. Bond order potential module for LAMMPS

    Energy Science and Technology Software Center (OSTI)

    2012-09-11

    pair_bop is a module for performing energy calculations using the Bond Order Potential (BOP) for use in the parallel molecular dynamics code LAMMPS. The bop pair style computes BOP based upon quantum mechanical incorporating both sigma and pi bondings. By analytically deriving the BOP pair bop from quantum mechanical theory its transferability to different phases can approach that of quantum mechanical methods. This potential is extremely effective at modeling 111-V and II-VI compounds such asmore » GaAs and CdTe. This potential is similar to the original BOP developed by Pettifor and later updated by Murdock et al. and Ward et al.« less

  15. Executive Order 13423 Implementing Instructions | Department of Energy

    Office of Environmental Management (EM)

    423 Implementing Instructions Executive Order 13423 Implementing Instructions INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" PDF icon Executive Order 13423 Implementing Instructions More Documents & Publications Implementing Executive Order 13423 Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental,

  16. Multiple-Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders

    Office of Environmental Management (EM)

    Chapter 16.5 (May 2011) 1 Multiple-Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders References Federal Acquisition Regulation (FAR) Subparts 1.1 Purpose, Authority, Issuance - 1.108 FAR conventions 2.1 Definitions 5.3 Synopses of Contract Awards 5.4 Release of Information 6 Competition Requirements 8.4 Federal Supply Schedules 9.1 Responsible Prospective Contractors - 9.105 Procedures 9.4 Debarment, Suspension and Ineligibility - 9.406 Debarment

  17. LG: Order (2015-CE-14022) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LG: Order (2015-CE-14022) LG: Order (2015-CE-14022) February 11, 2015 DOE ordered LG Electronics USA, Inc. to pay a 8,000 civil penalty after finding LG had failed to certify that ...

  18. FEMA - Executive Order 11990 - Protection of Wetlands 1977 |...

    Open Energy Info (EERE)

    FEMA - Executive Order 11990 - Protection of Wetlands 1977 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Executive OrderExecutive Order: FEMA -...

  19. Legacy: Order (2015-CE-14025) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Legacy: Order (2015-CE-14025) Legacy: Order (2015-CE-14025) February 11, 2015 DOE ordered The Legacy Companies to pay a $8,000 civil penalty after finding Legacy had failed to certify that refrigerator Maxx-Ice brand basic model MCR3U complies with the applicable energy conservation standards. PDF icon Legacy: Order (2015-CE-14025) More Documents & Publications Legacy: Proposed Penalty (2015-CE-14025) Maxlite: Order (2015-CE-27018) Electrolux: Order (2015-CE-14020)

  20. DOE Order on Quality Assurance | Department of Energy

    Energy Savers [EERE]

    Quality Assurance » DOE Order on Quality Assurance DOE Order on Quality Assurance The purpose of this order is to ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. PDF icon DOE Order on Quality Assurance More Documents & Publications Order Module--DOE O 414.1D, QUALITY ASSURANCE Order Module--SAFETY SOFTWARE GUIDE FOR USE WITH 10 CFR 830, SUBPART A, QUALITY

  1. PQL: Order (2013-CE-27001) | Department of Energy

    Energy Savers [EERE]

    Order (2013-CE-27001) PQL: Order (2013-CE-27001) August 7, 2015 DOE ordered P.Q.L, Inc. to pay a $12,500 civil penalty after finding PQL had failed to certify that certain models of medium base compact fluorescent lamps comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and PQL. PDF icon PQL: Order (2013-CE-27001) More Documents & Publications PQL: Proposed Penalty (2013-CE-27001) PQL: Order

  2. Task Order Price Evaluation Worksheet for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Order Price Evaluation Worksheet for ESPCs Task Order Price Evaluation Worksheet for ESPCs Document lists a series of site-specific proposal data questions to answer for a task order. Microsoft Office document icon pf-price_eval_worksheet_9.doc More Documents & Publications Task Order Price Evaluation Worksheet for SUPER ESPC Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) ESPC Task Order Financial Schedules (IDIQ Attachment J-6)

  3. Perlick: Order (2013-SE-14001) | Department of Energy

    Energy Savers [EERE]

    Order (2013-SE-14001) Perlick: Order (2013-SE-14001) May 14, 2015 DOE ordered Perlick Corporation to pay a $168,200 civil penalty after finding Perlick had manufactured and distributed in commerce in the U.S. 841 units of basic model HP24F, a noncompliant freezer. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Perlick. PDF icon Perlick: Order (2013-SE-14001) More Documents & Publications Perlick: Proposed Penalty (2013-SE-14001) Perlick: Order

  4. Consent Orders and Settlement Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consent Orders and Settlement Agreements Consent Orders and Settlement Agreements Documents Available for Download December 9, 2015 Consent Order, Brookhaven Science Associates, LLC Worker Safety and Health Enforcement Consent Order issued to Brookhaven Science Associates, LLC relating to an electrical shock event that occurred at the Brookhaven National Laboratory. June 22, 2015 Consent Order, Bechtel National, Inc. Nuclear Safety Enforcement Consent Order issued to Bechtel National, Inc.

  5. Memorandum of Understanding on Environmental Justice and Executive Order 12898

    Office of Environmental Management (EM)

    ON ENVIRONMENTAL JUSTICE AND EXECUTIVE ORDER 12898 WHEREAS, on February 11, 1994, the President signed Executive Order 12898, "Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations" ("Executive Order 12898" or "Order"), and issued an accompanying Presidential Memorandum (references to this Order herein also generally include this Memorandum), and WHEREAS, Executive Order 12898 applies to the following agencies: the

  6. Danco: Order (2015-CW-28006) | Department of Energy

    Office of Environmental Management (EM)

    Order (2015-CW-28006) Danco: Order (2015-CW-28006) July 7, 2015 DOE ordered Danco, Inc. to pay a $8,000 civil penalty after finding Danco had failed to certify that certain models of faucets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Danco. PDF icon Danco: Order (2015-CW-28006) More Documents & Publications Danco: Proposed Penalty (2015-CW-28006) Fagor America: Order (2014-CE-23018) MC

  7. DOE Celebrates 20-Year Anniversary of Executive Order 12898 on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice April 8, ...

  8. Executive Order 13514: Federal Leadership in Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance (2009) Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic ...

  9. Descriptions of ESPC Task Order Schedules and Placement of Pricing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information...

  10. FERC Order No. 792 - Interconnection Agreement | Open Energy...

    Open Energy Info (EERE)

    FERC Order No. 792 - Interconnection Agreement Abstract FERC Order No. 792, Small Generator Interconnection Agreement, current through June 3, 2013. Form Type Other Form Topic...

  11. Ordered Nanoparticle Catalysts article is an Energy Focus > Archived...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ordered Nanoparticle Catalysts article is an Energy Focus January 24th, 2013 A Nature Materials paper on ordered nanoparticle catalysts has been highlighted as an "Energy...

  12. Compliance Order, Los Alamos National Security, LLC - July 12...

    Energy Savers [EERE]

    Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 July 12, 2007 Issued to Los Alamos National Security,...

  13. Administrative Compliance Order HWB-14-21 Waste Isolation Pilot...

    Office of Environmental Management (EM)

    Bureau ("HWB") of the Environmental Health Division ("Division") of the New Mexico Environmental Department ("NMED") issues this Administrative Compliance Order ("Order") to the...

  14. Text Processing an Order or Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    an Order or Guide Processing a Policy or Notice Processing an Order or Guide Canceling a Directive by Website Administrator Development from justification memorandum through review...

  15. Idaho National Engineering Laboratory Consent Order, June 14...

    Office of Environmental Management (EM)

    Idaho National Engineering & Environmental Laboratory Consent Order 39-4413 State Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Resolve situations which...

  16. A high-order discontinuous Galerkin method for wave propagation...

    Office of Scientific and Technical Information (OSTI)

    A high-order discontinuous Galerkin method for wave propagation through coupled elastic-acoustic media Citation Details In-Document Search Title: A high-order discontinuous ...

  17. Guidance for Meeting Executive Order 13514 Water Goals | Department...

    Energy Savers [EERE]

    Water Efficiency Guidance for Meeting Executive Order 13514 Water Goals Guidance for Meeting Executive Order 13514 Water Goals The Federal Energy Management Program offers...

  18. Rad-Hydro with a High-Order, Low-Order Method

    SciTech Connect (OSTI)

    Wollaber, Allan Benton; Park, HyeongKae; Lowrie, Robert Byron; Rauenzahn, Rick M.; Cleveland, Mathew Allen

    2015-08-04

    Moment-based acceleration via the development of high-order, low-order (HO-LO) algorithms has provided substantial accuracy and efficiency enhancements for solutions of the nonlinear, thermal radiative transfer equations by CCS-2 and T-3 staff members. Accuracy enhancements over traditional, linearized methods are obtained by solving a nonlinear, timeimplicit HO-LO system via a Jacobian-free Newton Krylov procedure. This also prevents the appearance of non-physical maximum principle violations (temperature spikes) associated with linearization. Efficiency enhancements are obtained in part by removing effective scattering from the linearized system. In this highlight, we summarize recent work in which we formally extended the HO-LO radiation algorithm to include operator-split radiation-hydrodynamics.

  19. Ductile long range ordered alloys with high critical ordering temperature and wrought articles fabricated therefrom

    DOE Patents [OSTI]

    Liu, Chain T.; Inouye, Henry

    1979-01-01

    Malleable long range ordered alloys having high critical ordering temperatures exist in the V(Fe, Co).sub.3 and V(Fe, Co, Ni).sub.3 systems. These alloys have the following compositions comprising by weight: 22-23% V, 14-30% Fe, and the remainder Co or Co and Ni with an electron density no more than 7.85. The maximum combination of high temperature strength, ductility and creep resistance are manifested in the alloy comprising by weight 22-23% V, 14-20% Fe and the remainder Co and having an atomic composition of V(Fe .sub.0.20-0.26 C Co.sub.0.74-0.80).sub.3. The alloy comprising by weight 22-23% V, 16-17% Fe and 60-62% Co has excellent high temperature properties. The alloys are fabricable into wrought articles by casting, deforming, and annealing for sufficient time to provide ordered structure.

  20. Executive Order 13423: Strengthening Federal Environmental, Energy, and

    Office of Environmental Management (EM)

    Transportation Management | Department of Energy Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management Full text of Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. PDF icon eo13423.pdf More Documents & Publications Executive Order 13423- Strengthening Federal Environmental, Energy, and

  1. Harrington: Order (2014-SW-28011) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Harrington: Order (2014-SW-28011) Harrington: Order (2014-SW-28011) March 6, 2015 DOE ordered Harrington Brass Works to pay a $10,000 civil penalty after finding Harrington had manufactured and distributed in commerce in the U.S. 832 units of individual model 20-210-026, a noncompliant faucet. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Harrington. PDF icon Harrington: Order (2014-SW-28011) More Documents & Publications Harrington: Proposed

  2. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |

    Energy Savers [EERE]

    Department of Energy Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest

  3. Almo: Order (2012-CE-1416) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Almo: Order (2012-CE-1416) Almo: Order (2012-CE-1416) July 25, 2012 DOE ordered Almo Corporation to pay a $6,500 civil penalty after finding Almo had failed to certify that certain models of residential refrigerators comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Almo. PDF icon 2012-CE-1416_Almo_Order More Documents & Publications Almo: Proposed Penalty (2012-CE-1416) International

  4. Atlas Lighting: Order (2015-CE-48001) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2015-CE-48001) Atlas Lighting: Order (2015-CE-48001) July 7, 2015 DOE ordered Atlas Lighting Products to pay a $6,000 civil penalty after finding Atlas Lighting had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Atlas Lighting. PDF icon Atlas Lighting: Order (2015-CE-48001) More Documents & Publications Atlas Lighting:

  5. Atosa: Order (2015-CE-42037) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2015-CE-42037) Atosa: Order (2015-CE-42037) August 31, 2015 DOE ordered Atosa Catering Equipment, Inc. to pay a $8,000 civil penalty after finding Atosa had failed to certify that certain models of self-contained commercial refrigeration equipment with doors comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Atosa. PDF icon Atosa: Order (2015-CE-42037) More Documents & Publications Atosa:

  6. Danby Products: Order (2012-CE-1415) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Danby Products: Order (2012-CE-1415) Danby Products: Order (2012-CE-1415) August 9, 2012 DOE ordered Danby Products to pay a $9,900 civil penalty after finding Danby had failed to certify that certain models of refrigerators and freezers comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Danby. PDF icon Danby Products: Order (2012-CE-1415) More Documents & Publications Danby Products: Proposed

  7. ESPC ENABLE Draft Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Task Order ESPC ENABLE Draft Task Order Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project. File enable_drafttaskorder.docx More Documents & Publications ESPC Task Order Financial Schedules (IDIQ Attachment J-6) ESPC ENABLE Final Proposal Requirements Investor

  8. Electrolux: Order (2012-CE-1901) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrolux: Order (2012-CE-1901) Electrolux: Order (2012-CE-1901) July 27, 2012 DOE ordered Electrolux North America to pay a $6,500 civil penalty after finding Electrolux had failed to certify that certain dishwashers comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Electrolux. PDF icon Electrolux: Order (2012-CE-1901) More Documents & Publications Electrolux: Proposed Penalty (2012-CE-1901)

  9. Barron: Order (2013-CE-48004) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2013-CE-48004) Barron: Order (2013-CE-48004) July 15, 2015 DOE ordered Barron Lighting Group, Inc. to pay a $8,000 civil penalty after finding Barron had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Barron. PDF icon Barron: Order (2013-CE-48004) More Documents & Publications Barron: Proposed Penalty (2013-CE-48004)

  10. Sunpentown: Order (2012-CE-1505) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2012-CE-1505) Sunpentown: Order (2012-CE-1505) August 2, 2012 DOE ordered Sunpentown International Inc. to pay a $12,160 civil penalty after finding Sunpentown had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Sunpentown. PDF icon Sunpentown: Order (2012-CE-1505) More Documents & Publications Sunpentown: Proposed Penalty

  11. Philips: Order (2014-SE-48006) | Department of Energy

    Energy Savers [EERE]

    Order (2014-SE-48006) Philips: Order (2014-SE-48006) April 14, 2015 DOE ordered Philips Lighting North America Corp. to pay a $75,000 civil penalty after finding Philips had manufactured and distributed in commerce in the U.S. at least 12,275 units of a variety of illuminated exit sign models. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Philips. PDF icon Philips: Order (2014-SE-48006) More Documents & Publications Philips: Proposed Penalty

  12. RPI: Order (2015-CE-42065) | Department of Energy

    Energy Savers [EERE]

    Order (2015-CE-42065) RPI: Order (2015-CE-42065) November 6, 2015 DOE ordered RPI Industries, Inc. to pay a $8,000 civil penalty after finding RPI had failed to certify that certain models of commercial refrigeration equipment comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and RPI. PDF icon RPI: Order (2015-CE-42065) More Documents & Publications RPI: Proposed Penalty (2015-CE-42065) Maxlite:

  13. Compliance and Special Report Orders | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compliance and Special Report Orders Compliance and Special Report Orders Compliance Orders July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Issued to Los Alamos National Security, LLC related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory May 26, 1999 Preliminary Notice of Violation and Compliance Order, EA-1999-04 Issued to Fluor Daniel Hanford, Inc., relating to events at the Spent Nuclear Fuels

  14. Eurodib: Order (2014-CE-45001) | Department of Energy

    Office of Environmental Management (EM)

    Order (2014-CE-45001) Eurodib: Order (2014-CE-45001) May 11, 2015 DOE ordered Eurodib Inc. to pay a $8,000 civil penalty after finding Eurodib had failed to certify that certain models of automatic commercial ice makers comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Eurodib. PDF icon Eurodib: Order (2014-CE-45001) More Documents & Publications Eurodib: Proposed Penalty (2014-CE-45001) Fagor

  15. Everest Refrigeration: Order (2015-SE-42001) | Department of Energy

    Office of Environmental Management (EM)

    Order (2015-SE-42001) Everest Refrigeration: Order (2015-SE-42001) June 9, 2015 DOE ordered Bu Sung America Corporation (dba Everest Refrigeration) to pay a $12,080 civil penalty after finding Bu Sung had manufactured and distributed in commerce in the U.S. at least 64 units of noncompliant commercial refrigerator basic model ESGR3. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Bu Sung. PDF icon Everest Refrigeration: Order (2015-SE-42001) More

  16. New Guidelines for Implementing Executive Order 11988, "Floodplain

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management Standard..." | Department of Energy New Guidelines for Implementing Executive Order 11988, "Floodplain Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management Standard..." New Guidelines for Implementing Executive Order 11988, "Floodplain Management," And Executive Order 13690, "Establishing a Federal Flood Risk Management

  17. Morris: Order (2013-SE-5403) | Department of Energy

    Office of Environmental Management (EM)

    Order (2013-SE-5403) Morris: Order (2013-SE-5403) July 21, 2015 DOE ordered Morris Products, Inc. to pay a $170,720 civil penalty after finding Morris had manufactured and distributed in commerce in the U.S. a large quantity of noncompliant metal halide lamp fixtures. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Morris. PDF icon Morris: Order (2013-SE-5403) More Documents & Publications Morris: Proposed Penalty (2013-SE-5403) Morris:

  18. ELCO: Order (2014-SE-54005) | Department of Energy

    Office of Environmental Management (EM)

    Order (2014-SE-54005) ELCO: Order (2014-SE-54005) July 31, 2015 DOE ordered ELCO Lighting to pay a $14,000 civil penalty after finding ELCO had failed to certify that certain models of illuminated exit signs and metal halide lamp fixtures comply with the applicable energy conservation standards and had failed to provide requested test data. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and ELCO. PDF icon ELCO: Order (2014-SE-54005) More Documents &

  19. Eaton Cooper: Order (2015-CE-48003) | Department of Energy

    Office of Environmental Management (EM)

    Order (2015-CE-48003) Eaton Cooper: Order (2015-CE-48003) August 5, 2015 DOE ordered Eaton Cooper Lighting to pay a $8,000 civil penalty after finding Eaton Cooper had failed to certify that certain models of illuminated exit signs comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Eaton Cooper. PDF icon Eaton Cooper: Order (2015-CE-48003) More Documents & Publications Eaton Cooper: Proposed

  20. FERC Order No. 2003 Appendix 6 - Large Generator Interconnection...

    Open Energy Info (EERE)

    FERC Order No. 2003 Appendix 6 - Large Generator Interconnection Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 6 -...

  1. Paragon Sales: Order (2012-CE-1417) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2012-CE-1417) July 30, 2012 DOE ordered Paragon Sales Co., Inc., to pay a 6,000 civil penalty after finding Paragon Sales had failed to certify that certain models of...

  2. Manitowoc Foodservice: Order (2012-CE-5309) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2012-CE-5309) July 20, 2012 DOE ordered Manitowoc Foodservice to pay an 6,000 civil penalty after finding Manitowoc Foodservice had failed to certify that Manitowoc...

  3. Electrolux: Order (2012-CE-1901) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2012-CE-1901) July 27, 2012 DOE ordered Electrolux North America to pay a 6,500 civil penalty after finding Electrolux had failed to certify that certain dishwashers comply...

  4. Haier: Order (2011-CE-2104) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Haier: Order (2011-CE-2104) June 12, 2012 DOE ordered Haier to pay an 20,000 civil penalty after finding Haier had failed to certify that Haier residential clothes...

  5. Danby Products: Order (2012-CE-1415) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2012-CE-1415) August 9, 2012 DOE ordered Danby Products to pay a 9,900 civil penalty after finding Danby had failed to certify that certain models of refrigerators...

  6. Executive Order 11988 - Floodplain Management | Open Energy Informatio...

    Open Energy Info (EERE)

    Order 11988 - Floodplain ManagementLegal Published NA Year Signed or Took Effect 1977 Legal Citation Exec. Order No. 11988, 3 CFR 1977 (1977). DOI Not Provided Check for DOI...

  7. High order reflectivity of graphite (HOPG) crystals for x ray...

    Office of Scientific and Technical Information (OSTI)

    High order reflectivity of graphite (HOPG) crystals for x ray energies up to 22 keV Citation Details In-Document Search Title: High order reflectivity of graphite (HOPG) crystals...

  8. Construction of energy-stable projection-based reduced order...

    Office of Scientific and Technical Information (OSTI)

    Construction of energy-stable projection-based reduced order models Prev Next Title: Construction of energy-stable projection-based reduced order models Our paper aims to ...

  9. General Order No. 131-D | Open Energy Information

    Open Energy Info (EERE)

    Order No. 131-D Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: General Order No. 131-DLegal Abstract Rules relating to the planning...

  10. CPUC General Order 131-D | Open Energy Information

    Open Energy Info (EERE)

    CPUC General Order 131-D Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: CPUC General Order 131-DLegal Abstract California...

  11. Portsmouth Site Treatment Plan Director's Final Findings and Orders |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Treatment Plan Director's Final Findings and Orders Portsmouth Site Treatment Plan Director's Final Findings and Orders Portsmouth Site Treatment Plan Director's Final Findings and Orders is an agreement between the Ohio EPA and DOE approving the Site Treatment Plan and setting forth guidelines for storage and treatment of mixed wastes at the Portsmouth Facility. PDF icon Portsmouth Site Treatment Plan Director's Final Findings and Order - 1995 More Documents &

  12. Utility: Order (2016-CE-42007) | Department of Energy

    Energy Savers [EERE]

    CE-42007) Utility: Order (2016-CE-42007) January 5, 2016 DOE ordered Utility Refrigerator to pay a $8,000 civil penalty after finding Utility had failed to certify that certain models of commercial refrigerator equipment comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Utility. PDF icon Utility: Order (2016-CE-42007) More Documents & Publications Utility: Proposed Penalty (2016-CE-42007)

  13. International Refrigeration: Order (2012-CE-1510) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Refrigeration: Order (2012-CE-1510) International Refrigeration: Order (2012-CE-1510) July 20, 2012 DOE ordered International Refrigeration Products to pay an $8,000 civil penalty after finding International Refrigeration had failed to certify that certain room air conditioners comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and International Refrigeration. PDF icon International

  14. Haier: Order (2011-CE-2104) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Haier: Order (2011-CE-2104) Haier: Order (2011-CE-2104) June 12, 2012 DOE ordered Haier to pay an $20,000 civil penalty after finding Haier had failed to certify that Haier residential clothes dryers comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Haier. PDF icon Haier: 2011-CE-2104 More Documents & Publications Haier: Proposed Penalty (2011-CE-2104) Haier: Noncompliance Determination

  15. Executive Order 11990: Protection Of Wetlands | Department of Energy

    Energy Savers [EERE]

    990: Protection Of Wetlands Executive Order 11990: Protection Of Wetlands In order to avoid to the extent possible the long and short term adverse impacts associated with the destruction or modification of wetlands and to avoid direct or indirect support of new construction in wetlands wherever there is a practicable alternative, it is hereby ordered as follows: Download Document PDF icon Executive Order 11990: Protection Of Wetlands More Documents & Publications Historical - Floodplain

  16. Executive Order 13031-Federal Alternative Fueled Vehicle Leadership |

    Energy Savers [EERE]

    Department of Energy 3031-Federal Alternative Fueled Vehicle Leadership Executive Order 13031-Federal Alternative Fueled Vehicle Leadership The purpose of this order is to ensure that the Federal Government exercise leadership in the use of alternative fueled vehicles (AFVs). PDF icon Executive Order 13031-Federal Alternative Fueled Vehicle Leadership More Documents & Publications Executive Order 12969-Federal Acquisition and Community RightTo-Know EO 13089 -- Coral Reef Protection

  17. Goodman Manufacturing: Order (2012-CE-1509) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-CE-1509) Goodman Manufacturing: Order (2012-CE-1509) August 7, 2012 DOE ordered Goodman Manufacturing Company L.P. to pay an $8,000 civil penalty after finding Goodman Manufacturing had failed to certify that certain room air conditioners comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Goodman Manufacturing. PDF icon Goodman Manufacturing: Order (2012-CE-1509) More Documents & Publications

  18. Distinctive Appliances: Order (2015-CE-14019) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distinctive Appliances: Order (2015-CE-14019) Distinctive Appliances: Order (2015-CE-14019) February 19, 2015 DOE ordered Distinctive Appliances Distributing, Inc. to pay a $16,000 civil penalty after finding Distinctive Appliances had failed to certify that certain models of Fhiaba-brand refrigerator-freezers comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Distinctive Appliances. PDF icon

  19. Bigwall: Order (2014-SE-15006) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bigwall: Order (2014-SE-15006) Bigwall: Order (2014-SE-15006) December 17, 2014 DOE ordered Bigwall Enterprises, Inc. to abide by the terms of the Notice of Noncompliance Determination, issued on February 11, 2014, after finding Bigwall Enterprises, Inc. had privately labeled and distributed in commerce in the U.S. at least 600 units of PerfectAire brand room air conditioner model PACH8000. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Bigwall. PDF

  20. Systemair: Order (2016-CE-43003) | Department of Energy

    Energy Savers [EERE]

    Systemair: Order (2016-CE-43003) Systemair: Order (2016-CE-43003) February 23, 2016 DOE ordered Systemair, Inc., to pay a $8,000 civil penalty after finding Systemair had failed to certify that its single package vertical air conditioning and heating equipment comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Systemair. DOE regulations require a manufacturer (which includes importers) to submit

  1. Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk -

    Energy Savers [EERE]

    February 2, 2002 | Department of Energy DOE Orders and Applicable CFRs/DEAR Crosswalk - February 2, 2002 Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk - February 2, 2002 February 2, 2002 DOE Orders/Standards and Applicable CFRs/DEAR Crosswalk List PDF icon Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk More Documents & Publications Technical Standards,DOE Standards and Corresponding Directives Crosswalk - February 2, 2002 Technical Standards,

  2. True: Order (2015-CE-42049) | Department of Energy

    Energy Savers [EERE]

    True: Order (2015-CE-42049) True: Order (2015-CE-42049) February 4, 2016 DOE ordered True Manufacturing Co., Inc., to pay a $36,400 civil penalty after finding True had manufactured and distributed in commerce in the U.S. 182 units of True commercial refrigerator basic models TCGG-72 and GCGG-72-S, which did not meet the application energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and True. Federal law subjects manufacturers and

  3. Sanyo Electric: Order (2010-CE-1210) | Department of Energy

    Energy Savers [EERE]

    Sanyo Electric: Order (2010-CE-1210) Sanyo Electric: Order (2010-CE-1210) October 13, 2010 DOE issued an Order and entered into a Compromise Agreement with Sanyo E&E Corp. after finding Sanyo had used an improper method to submit its certification that certain models of residential refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Sanyo. PDF

  4. Task Order Awarded for Technical Support Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Order Awarded for Technical Support Services Task Order Awarded for Technical Support Services September 26, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a Task Order for Technical Services to Project Enhancement Corporation, of Germantown, MD, for technical support services at the Environmental Management 13 (EM-13) office in Washington DC. The task order was a competitive small

  5. Consent Order, Brookhaven Science Associates, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consent Order, Brookhaven Science Associates, LLC Consent Order, Brookhaven Science Associates, LLC December 2015 Worker Safety and Health Enforcement Consent Order issued to Brookhaven Science Associates, LLC relating to an electrical shock event that occurred at the Brookhaven National Laboratory. On November 23, 2015, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Consent Order (WCO-2015-02) to Brookhaven Science Associates, LLC, relating

  6. Fujitsu: Order (2015-CE-16014) | Department of Energy

    Office of Environmental Management (EM)

    Fujitsu: Order (2015-CE-16014) Fujitsu: Order (2015-CE-16014) October 27, 2015 DOE ordered Fujitsu General America, Inc. to pay a $8,000 civil penalty after finding Fujitsu had failed to certify that certain models of central air conditioners and heat pumps comply with the applicable energy conservation standards prior to distributing them in commerce. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Fujitsu. DOE regulations require a manufacturer (which

  7. LLNS Beryllium Consent Order Fact Sheet | Department of Energy

    Office of Environmental Management (EM)

    LLNS Beryllium Consent Order Fact Sheet LLNS Beryllium Consent Order Fact Sheet In November 2010, the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) issued a consent order to Lawrence Livermore National Security, LLC (LLNS) for deficiencies related to LLNS's implementation of DOE's Chronic Beryllium Disease Prevention Program (CBDPP) regulation at Lawrence Livermore National Laboratory. The consent order requires LLNS to implement corrective actions that

  8. Lochinvar: Order (2016-CE-24001) | Department of Energy

    Office of Environmental Management (EM)

    Lochinvar: Order (2016-CE-24001) Lochinvar: Order (2016-CE-24001) November 2, 2015 DOE ordered Lochinvar, LLC, to pay a $8,000 civil penalty after finding Lochinvar had failed to certify that certain models of pool heaters comply with the applicable energy conservation standard. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Lochinvar. DOE regulations require a manufacturer (which includes importers) to submit reports certifying that its products have

  9. Goodman Manufacturing: Order (2011-SE-4301) | Department of Energy

    Office of Environmental Management (EM)

    Goodman Manufacturing: Order (2011-SE-4301) Goodman Manufacturing: Order (2011-SE-4301) March 2, 2012 DOE ordered Goodman Manufacturing Company, L.P., to pay a $14,800 civil penalty after finding Goodman had manufactured and distributed in commerce in the U.S. at least 74 units of commercial package air conditioner basic model CPC180*. PDF icon Goodman Manufacturing: Order (2011-SE-4301) More Documents & Publications Goodman Manufacturing: Proposed Penalty (2011-SE-4301) Goodman

  10. Midea America: Order (2014-SEW-20006) | Department of Energy

    Office of Environmental Management (EM)

    Midea America: Order (2014-SEW-20006) Midea America: Order (2014-SEW-20006) March 19, 2015 DOE ordered Midea America Corp. to abide by the terms of the Notice of Noncompliance Determination, issued on December 4, 2014, after finding Midea America had imported and distributed in commerce in the U.S. at least 216 units of basic model MAE80-S1702GPS, a noncompliant residential clothes washer. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Midea America.

  11. Maxlite: Order (2015-CE-27018) | Department of Energy

    Office of Environmental Management (EM)

    5-CE-27018) Maxlite: Order (2015-CE-27018) May 14, 2015 DOE ordered Maxlite, Inc. to pay a $8,000 civil penalty after finding Maxlite had failed to certify that certain models of general service fluorescent lamps comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Maxlite. PDF icon Maxlite: Order (2015-CE-27018) More Documents & Publications Maxlite: Proposed Penalty (2015-CE-27018) Maxlite:

  12. DOE Order 420.1C Briefing | Department of Energy

    Office of Environmental Management (EM)

    20.1C Briefing DOE Order 420.1C Briefing August 2013 PowerPoint Briefing of Changes to DOE O 420.1C and Expectations for Effective Implementation The revised Order clarifies, streamlines and updates DOE and contractors' reqquirements and responsibilities The revised Order updates the requirements to reflect current industry practices EHSS is open to feedback from implementing organizations EHSS is available to provide assistance in understanding the Order requirements and how to effectively

  13. West Valley Demonstration Project Administrative Consent Order, August 27, 1996

    Office of Environmental Management (EM)

    Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 EM Home | Regulatory Compliance | Environmental Compliance Agreements West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION AND THE UNITED STATES DEPARTMENT OF ENERGY EPA ID NUMBER NYD980779540 In the Matter of | | UNITED STATES | ORDER DEPARTMENT OF ENERGY, | Docket No. __________ | RESPONDENT | ___________________________|

  14. U.S. Department of Energy Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Order U.S. Department of Energy Order WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) PDF icon U.S. Department of Energy Order More Documents & Publications DOE M 481.1-1A DOE O 481.1C, WORK FOR OTHERS (NON-DEPARTMENT OF ENERGY FUNDED WORK) Work for Others Program Interagency Work

  15. DOE Order 482.1 | Department of Energy

    Office of Environmental Management (EM)

    Order 482.1 DOE Order 482.1 DOE FACILITIES TECHNOLOGY PARTNERING PROGRAMS PDF icon DOE Order 482.1 More Documents & Publications DOE Cooperative Research and Development Agreements DOE M 483.1-1 Policy_Statement_on_Technology_Transfer.pdf

  16. Victory: Order (2015-SE-42033) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order (2015-SE-42033) Victory: Order (2015-SE-42033) October 27, 2015 DOE ordered Victory Refrigeration to pay a $1,600 civil penalty after finding Victory had manufactured and distributed in commerce in the U.S. at least 8 units of commercial refrigerator-freezer basic model RFS-1D-S1-EW-PT-HD, a noncompliant product. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Victory. PDF icon Victory: Order (2015-SE-42033) More Documents & Publications

  17. Cameron LNG LLC Final Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cameron LNG LLC Final Order Cameron LNG LLC Final Order FE Dkt. No. 11-162-LNG - Order 3391-A The Final Opinion and Order Granting Long-term Multi-contract Authorization to Export Liquefied Natural Gas (LNG) by Vessel from the Cameron LNG Terminal in Cameron Parish, Louisiana, to Non-Free Trade Agreement Nations can be found in the PDF below. PDF icon 1. 09/10/14 - Order 3391-A More Documents & Publications Freeport LNG Expansion, L.P. and FLNG Liquefaction, LLC - FE Dkt. No. 10-161-LNG

  18. Traulsen: Order (2015-SE-42002) | Department of Energy

    Energy Savers [EERE]

    Order (2015-SE-42002) Traulsen: Order (2015-SE-42002) August 31, 2015 DOE ordered Traulsen - ITW Food Group LLC to pay a $52,600 civil penalty after finding Traulsen had manufactured and distributed in commerce in the U.S. at least 284 units of commercial refrigerator-freezer basic model RDT132DUT-HHS, a noncompliant product. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Traulsen. PDF icon Traulsen: Order (2015-SE-42002) More Documents &

  19. GE Appliances: Order (2012-SE-1403) | Department of Energy

    Office of Environmental Management (EM)

    Appliances: Order (2012-SE-1403) GE Appliances: Order (2012-SE-1403) October 3, 2012 DOE ordered GE Appliances, a Division of General Electric Company to pay a $63,000 civil penalty after finding GE had privately labeled and distributed in commerce in the U.S. the 4-cubic-foot capacity refrigerator basic model SMR04GAZCS, which includes models SMR04GAZACS and SMR04GAZBCS. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and GE. PDF icon GE Appliances: Order

  20. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order DOE Awards Small Business Task Order December 17, 2015 - 10:00am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Firm-Fixed Unit Rate Task Order to Sage Energy Trading of Jenks, OK. Sage Energy Trading is a Woman Owned Small Business. The Task Order will have a maximum value of $3.5 million over 2 years. Work performed under this Task Order will be performed at the Portsmouth Gaseous

  1. Scale-invariant entropy-based theory for dynamic ordering

    SciTech Connect (OSTI)

    Mahulikar, Shripad P. E-mail: spm@aero.iitb.ac.in; Kumari, Priti

    2014-09-01

    Dynamically Ordered self-organized dissipative structure exists in various forms and at different scales. This investigation first introduces the concept of an isolated embedding system, which embeds an open system, e.g., dissipative structure and its mass and/or energy exchange with its surroundings. Thereafter, scale-invariant theoretical analysis is presented using thermodynamic principles for Order creation, existence, and destruction. The sustainability criterion for Order existence based on its structured mass and/or energy interactions with the surroundings is mathematically defined. This criterion forms the basis for the interrelationship of physical parameters during sustained existence of dynamic Order. It is shown that the sufficient condition for dynamic Order existence is approached if its sustainability criterion is met, i.e., its destruction path is blocked. This scale-invariant approach has the potential to unify the physical understanding of universal dynamic ordering based on entropy considerations.

  2. Portsmouth Integration Director's Final Findings and Order | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Integration Director's Final Findings and Order Portsmouth Integration Director's Final Findings and Order Portsmouth Integration Director's Final Findings and Order purpose is to: integrate the on-site work required for specific units to avoid duplication of effort, and efficiently perform sitewide ground water monitoring and surveillance and maintenance activities; recognize that a substantial portion of the tasks required under existing approved closure plans for certain units have

  3. Executive Order 13158-Marine Protected Areas | Department of Energy

    Energy Savers [EERE]

    58-Marine Protected Areas Executive Order 13158-Marine Protected Areas This Executive Order will help protect the significant natural and cultural resources within the marine environment for the benefit of present and future generations by strengthening and expanding the Nation's system of marine protected areas (MPAs). PDF icon Executive Order 13158-Marine Protected Areas More Documents & Publications EO 13089 -- Coral Reef Protection ARPA-E Technical Support Memo Appendices Microsoft Word

  4. Hanford Waste Treatment Plant Support Task Order Modified | Department of

    Energy Savers [EERE]

    Energy Hanford Waste Treatment Plant Support Task Order Modified Hanford Waste Treatment Plant Support Task Order Modified March 11, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a modification to a task order to Aspen Resources Limited, Inc. of Boulder, Colorado for support of the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site. The modification increased the value

  5. Implementation of Executive Order 13514, Federal Leadership in

    Energy Savers [EERE]

    Environmental, Energy, and Economic Performance | Department of Energy Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance Implementation of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance PDF icon 2010.03.31 Secretary Memo - Scope 1 GHG reduction goal.pdf More Documents & Publications OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance Guidance for

  6. Energy Department Awards First Major Task Order Under Streamlined

    Energy Savers [EERE]

    Contracting System | Department of Energy First Major Task Order Under Streamlined Contracting System Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up WASHINGTON, DC - The Department of Energy (DOE) has awarded a Task Order for an estimated $19.4 million to LATA-SHARP Remediation Services, LLC for the completion of clean-up activities at the Ashtabula Closure Project (ACP)

  7. Investigation of odd-order nonlinear susceptibilities in atomic vapors

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect SciTech Connect Search Results Journal Article: Investigation of odd-order nonlinear susceptibilities in atomic vapors Citation Details In-Document Search Title: Investigation of odd-order nonlinear susceptibilities in atomic vapors We theoretically deduce the macroscopic symmetry constraints for arbitrary odd-order nonlinear susceptibilities in homogeneous media including atomic vapors for the first time. After theoretically calculating the expressions

  8. Consent Order, Bechtel National, Inc. | Department of Energy

    Energy Savers [EERE]

    National, Inc. Consent Order, Bechtel National, Inc. June 2015 Nuclear Safety Enforcement Consent Order issued to Bechtel National, Inc. regarding deficiencies in facility design and authorization basis documentation, vessel welds, and quality assurance and corrective action program implementation at the Waste Treatment and Immobilization Plant. On June 1, 2015, the U.S. Department of Energy's (DOE) Office of Enforcement issued a Consent Order (NCO-2015-02) to Bechtel National, Inc., the

  9. Consent Order, UT-Battelle, LLC | Department of Energy

    Energy Savers [EERE]

    UT-Battelle, LLC Consent Order, UT-Battelle, LLC May 2015 Nuclear Safety Enforcement Consent Order issued to UT-Battelle, LLC for deficiencies associated with an airborne radiation release and radiological uptake by workers at DOE's Oak Ridge National Laboratory. On May 14, 2015, the U.S. Department of Energy's (DOE) Office of Enforcement issued a Consent Order (NCO-2015-01) to UT-Battelle, LLC, for deficiencies associated with an airborne radiation release and radiological uptake by workers

  10. Mound Plant Director's Final Findings and Orders, October 4, 1995

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 EM Home | Regulatory Compliance | Environmental Compliance Agreements Mound Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Mound Facility : Findings and Order P.O. Box 66 : Miamisburg, Ohio 45343-0066 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of

  11. ARM - Engineering Work Request & Engineering Work Order Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control

  12. Descriptions of ESPC Task Order Schedules and Placement of Pricing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information (IDIQ Attachment J-5) | Department of Energy Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Document provides task order schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs). PDF icon 5_4_descriptionoftoschedules_j5.pdf More Documents & Publications ESPC Task

  13. Surface Remeshing with Robust High-Order Reconstruction (Journal Article) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Surface Remeshing with Robust High-Order Reconstruction Citation Details In-Document Search Title: Surface Remeshing with Robust High-Order Reconstruction Remeshing is an important problem in variety of applications, such as finite element methods and geometry processing. Surface remeshing poses some unique challenges, as it must deliver not only good mesh quality but also good geometric accuracy. For applications such as finite elements with high-order elements (quadratic or

  14. Revised Guidelines for Implementing Executive Order 11988, "Floodplain

    Energy Savers [EERE]

    Management," and Executive Order 13690, "Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input" (2015) | Department of Energy Guidelines for Implementing Executive Order 11988, "Floodplain Management," and Executive Order 13690, "Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input" (2015) Revised Guidelines for

  15. OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental,

    Energy Savers [EERE]

    Energy and Economic Performance | Department of Energy OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance PDF icon OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance More Documents & Publications Microsoft PowerPoint - 08 Lawrence 2010 DOE PM Workshop_EO 13514_03-01-10_presentation

  16. American Indian Policy and Relevant DOE and Executive Orders | Department

    Energy Savers [EERE]

    of Energy Tribal Programs » American Indian Policy and Relevant DOE and Executive Orders American Indian Policy and Relevant DOE and Executive Orders Over the course of American history, the Federal government's relationship with Indian Tribes has been defined and modified by treaties, executive orders, court decisions, specific legislation passed by Congress, and regulations. Important rights were guaranteed to Tribes by treaty, with many of these rights still enforceable today. Case law,

  17. Executive Order 11988 (1977): Floodplain Management | Department of Energy

    Office of Environmental Management (EM)

    Executive Order 11988 (1977): Floodplain Management Executive Order 11988 (1977): Floodplain Management Issued in 1977 to avoid to the extent possible the long and short term adverse impacts associated with the occupancy and modification of floodplains and to avoid direct or indirect support of floodplain development wherever there is a practicable alternative. This E.O. was amended by E.O. 13690. See the amended E.O. at: http://energy.gov/node/1446141. Download Document PDF icon Executive Order

  18. Executive Order 13693-Planning for Federal Sustainability in the Next

    Office of Environmental Management (EM)

    Decade | Department of Energy 93-Planning for Federal Sustainability in the Next Decade Executive Order 13693-Planning for Federal Sustainability in the Next Decade PDF icon Executive Order 13693-Planning for Federal Sustainability in the Next Decade More Documents & Publications E.O. 13690 (2015): Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input Executive Order 13423: Strengthening Federal Environmental, Energy,

  19. Executive Order 13693 Training Now Available On Demand | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Executive Order 13693 Training Now Available On Demand Executive Order 13693 Training Now Available On Demand January 4, 2016 - 8:00am Addthis Executive Order (E.O.) 13693: Recent Developments, Implementation Updates, and Opportunities Training is now available on-demand. The seminar covers the major goals of E. O. 13693 and offers examples of technologies and concepts the U.S. Department of Energy and other federal agencies are using to meet these goals. Addthis Related Articles

  20. Executive Orders Defining Tribal Relationships | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Orders Defining Tribal Relationships Executive Orders Defining Tribal Relationships Executive Order 13592 Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011). Superseded EO 13021 to ensure that all American Indian students, regardless of which institution they attend, receive support from the federal government at elementary through college levels. This EO also creates an Interagency Working Group on AI/AN

  1. Implementation of Executive Order 12114 Environmental Effects Abroad of

    Office of Environmental Management (EM)

    Major Federal Actions: Final Guideline | Department of Energy Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979. PDF icon

  2. N:\WPWIN60\ORDERS\PP-118.ORD

    Office of Environmental Management (EM)

    HILL COUNTY ELECTRIC COOPERATIVE, INC. ORDER NO. PP-118 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order 10485, as amended by Executive Order 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated July 11, 1996, as amended on July 25, 1996,

  3. Task Order Awarded for Audit and Review Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services. These services will include: pricing proposals, requests for equitable adjustment, change order proposals, business systems (accounting, purchasing and billing systems), forward pricing rates, incurred costs audits, and terminations. Individual subtask orders will be placed for each specific assignment as needed from October 1, 2012 through September 30, 2013. The total not-toexceed value of the task order is $2,993,733.00.

  4. Briefing, DOE Order 475.2B, Identifying Classified Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    What Derivative Classifiers Should Know Briefing, DOE Order 475.2B, Identifying Classified Information, What Derivative Classifiers Should Know October 14, 2014 This briefing ...

  5. DOE Sustainability Support Information Brief on Executive Order...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Justice in Minority and Low-Income Populations DOE Sustainability Support Information Brief on Executive Order 12898, Federal Actions to Address Environmental Justice in ...

  6. Energy Department Awards First Major Task Order Under Streamlined...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up ...

  7. Prediction of ordered arrays of nanoparticle superlattices by...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Prediction of ordered arrays of nanoparticle superlattices by self-assembly Engineering the interfaces that will solve the technological challenges of this century requires an...

  8. United States Department of the Interior - Directors Order 53...

    Open Energy Info (EERE)

    Regulatory GuidanceGuideHandbook Abstract This Director's Order sets forth the policies and procedures for administering special park uses on NPS lands. Author USDOI...

  9. Secretary Bodman Signs Order to Help Restore Electricity to East...

    Energy Savers [EERE]

    that Entergy's transmission and delivery infrastructure sustained severe damage from Hurricane Rita. Under this order, CenterPoint will temporarily provide electricity through...

  10. OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Environmental, Energy and Economic Performance OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy and Economic Performance PDF icon OVERVIEW OF ...

  11. Implementation of Executive Order 13514, Federal Leadership in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Environmental, Energy, and Economic Performance Implementation of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance PDF icon ...

  12. BPA seeks clarification and rehearing on FERC order on Environmental...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and rehearing of the Federal Energy Regulatory Commission's order on BPA's Interim Environmental Redispatch policy. "While BPA is meeting a regulatory deadline to respond to...

  13. White House Announces New Executive Order To Reduce Greenhouse...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    According to the White House, the President's executive order will build on the federal government's progress in reducing emissions to promote more sustainability actions over the ...

  14. Executive Order 12088: Federal Compliance with Pollution Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2088: Federal Compliance with Pollution Control Standards Executive Order 12088: Federal Compliance with Pollution Control Standards The head of each Executive agency is ...

  15. DOE Awards Research and Systems Engineering Task Order

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today awarded a task order to The MITRE Corporation, of McLean Virginia.

  16. Executive Order 13148-Greening the Government Through Leadership...

    Energy Savers [EERE]

    and long-term planning processes, across all agency missions, activities, and functions. PDF icon Executive Order 13148-Greening the Government Through Leadership in...

  17. FERC Order No. 792 - Interconnection Request | Open Energy Information

    Open Energy Info (EERE)

    792 - Interconnection RequestLegal Abstract FERC Order No. 792, Attachment 2, Small Generator Interconnection Request Form, current through June 3, 2014. Published NA Year...

  18. Executive Order 13186: Responsibilities of Federal Agencies To...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Order 13186: Responsibilities of Federal Agencies To Protect Migratory Birds Migratory bird conventions impose substantive obligations on the United States for the conservation of...

  19. Spin Superstructure and Noncoplanar Ordering in Metallic Pyrochlore...

    Office of Scientific and Technical Information (OSTI)

    Title: Spin Superstructure and Noncoplanar Ordering in Metallic Pyrochlore Magnets with Degenerate Orbitals Authors: Chern, Gia-Wei ; Batista, Cristian D. Publication Date: ...

  20. NMED Revised LANL Consent Order Draft March 2016

    Broader source: Energy.gov [DOE]

    At the March 30, 2016 Board Meeting: The New Mexico Environment Department gave an Overview of the Revised LANL Consent Order.

  1. Self-consistent second-order Green's function perturbation theory...

    Office of Scientific and Technical Information (OSTI)

    Self-consistent second-order Green's function perturbation theory for periodic systems Citation Details In-Document Search This content will become publicly available on February...

  2. Task Order Price Evaluation Worksheet for SUPER ESPC

    Broader source: Energy.gov [DOE]

    Document provides a worksheet for evaluating price for a task order as part of a Super Energy Savings Performance Contract (ESPC).

  3. DOE - NNSA/NFO -- Test Film Order Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home > Library > Forms > Historical Test Film Order Form U.S. DOE/NNSA - Nevada Field Office Historical Test Film Order Form The Historical Nuclear Weapons Test films which have been declassified can be ordered from the Nuclear Testing Archive for a fee per video, plus shipping and handling. The form is used only to request a film(s). A representative will contact you regarding your order and payment options. Please call 702-794-5117 or 702-794-5106. You can contact us by email to

  4. A consistent second order projection scheme for simulating transient...

    Office of Scientific and Technical Information (OSTI)

    A consistent second order projection scheme for simulating transient viscous flow with Smoothed Particle Hydrodynamics. Citation Details In-Document Search Title: A consistent...

  5. Exploring Mesoscopic Physics of Vacancy-Ordered Systems through...

    Office of Scientific and Technical Information (OSTI)

    Physics of Vacancy-Ordered Systems through Atomic Scale Observations of Topological Defects Citation Details In-Document Search Title: Exploring Mesoscopic Physics of ...

  6. Draft Revised Guidelines for Implementing Executive Order 11988, "Floodplain Management"

    Broader source: Energy.gov [DOE]

    The Federal Emergency Management Agency published the draft Revised Guidelines for Implementing Executive Order 11988, Floodplain Management for public review and comment on January 30, 2015.

  7. Mound Plant Director's Final Findings and Orders, October 4,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Director's Final Findings and Orders State Ohio Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Approve the Compliance Plan Volume of the amended PSTP,...

  8. Executive Order 13045, Protection of Children from Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection of Children from Environmental Health Risks and Safety Risks Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks Each Federal ...

  9. Processing an Order or Guide - DOE Directives, Delegations, and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Breadcrumb >> Breadcrumb Processing an Order or Guide by Website Administrator Text version available here Document Actions Justification Memorandum Initial Draft Coordination:...

  10. Observation of Ordered Structures in Counterion Layers near Wet...

    Office of Scientific and Technical Information (OSTI)

    Observation of Ordered Structures in Counterion Layers near Wet Charged Surfaces: A Potential Mechanism for Charge Inversion Citation Details In-Document Search Title: Observation ...

  11. Highly Ordered Tailored Three-Dimensional Hierarchical Porous...

    Office of Scientific and Technical Information (OSTI)

    Hierarchical Porous Gold Architectures. Citation Details In-Document Search Title: Highly Ordered Tailored Three-Dimensional Hierarchical Porous Gold Architectures. ...

  12. Notice of Emergency Action - Emergency Order To Resume Limited...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operation at the Potomac River Generating Station, Alexandria, VA, in Response to ... Order No. 202-05-3 of the District of Columbia Public Service Commission Department ...

  13. FERC Order No. 2003 Appendix 5 - Optional Interconnection Study...

    Open Energy Info (EERE)

    5 - Optional Interconnection Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 5 - Optional Interconnection...

  14. President Bush Issues Executive Order Designating ITER International...

    Office of Science (SC) Website

    President Bush Issues Executive Order Designating ITER International Fusion Energy ... Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW ...

  15. Erratum: Leading-order calculation of electric conductivity in...

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Search Results Journal Article: Erratum: Leading-order calculation of electric conductivity in hot quantum electrodynamics from diagrammatic methods Phys. Rev. D ...

  16. LFRG DOE Order 435.1 | Department of Energy

    Energy Savers [EERE]

    LFRG DOE Order 435.1 LFRG DOE Order 435.1 Chapter 4 of the DOE Manual on Order 435.1, Low-level Waste Requirements, addresses the procedures whereby Department of Energy LLW Disposal Facilities will operated and maintained. Section P and Section Q describe the Performance Assessment and Composite Analysis documents that each DOE disposal facility will submit to the LFRG. To view the entire DOE Order, Manual, and Implementation Guidance documents, choose the link below to get to the main DOE

  17. Executive Order 13212: 66 FR 28357 (22 May 2001)

    Office of Environmental Management (EM)

    Executive Order 13212: 66 FR 28357 (22 May 2001) Executive Order 13212--Actions To Expedite Energy-Related Projects May 18, 2001 By the authority vested in me as President by the Constitution and the laws of the United States of America, and in order to take additional steps to expedite the increased supply and availability of energy to our Nation, it is hereby ordered as follows: Section 1. Policy. The increased production and transmission of energy in a safe and environmentally sound manner is

  18. Friedrich: Order (2014-SE-15010) | Department of Energy

    Office of Environmental Management (EM)

    Order (2014-SE-15010) Friedrich: Order (2014-SE-15010) October 27, 2015 DOE ordered Friedrich Air Conditioning Co. to pay a civil penalty of $1,494,626.25 after finding Friedrich had manufactured and distributed in commerce in the U.S. 8,241 units of Friedrich model SQ10N10, a noncompliant room air conditioner. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Friedrich. Federal law subjects manufacturers and private labelers to civil penalties if those

  19. Public Utilities Commission General Order NO. 131-D | Open Energy...

    Open Energy Info (EERE)

    Public Utilities Commission General Order NO. 131-D Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Public Utilities...

  20. DOE Awards Task Order for Lexington Project Office Audit

    Broader source: Energy.gov [DOE]

    Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

  1. NMED Administrative Order to LANL May 19, 2015

    Broader source: Energy.gov [DOE]

    Pursuant to NMSA 1978, Section 74-4-13(A) of the Hazardous Waste Act ("HWA"), the New Mexico Environment Department hereby orders the Department of Energy, and Los Alamos National Security, LLC; collectively, with DOE, the, to comply with the terms and conditions of this Administrative Order relating to the Los Alamos National Laboratory.

  2. Executive Order 13175: Consultation and Coordination with Indian Tribal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Governments (2000) | Department of Energy 175: Consultation and Coordination with Indian Tribal Governments (2000) Executive Order 13175: Consultation and Coordination with Indian Tribal Governments (2000) Executive Order 13175: Consultation and Coordination with Indian Tribal Governments (2000). Establishes standards for regular and meaningful consultation with Tribal officials to strengthen the government-to-government relationships with Indian tribes, including establishment of

  3. A Second-Order Achromat Design Based on FODO Cell

    SciTech Connect (OSTI)

    Sun, Yipeng; /SLAC

    2011-08-19

    Two dipole doglegs are widely used to translate the beam axis horizontally or vertically. Quadrupoles are placed between the two consecutive dipoles to match first order dispersion and provide betatron focusing. Similarly a four dipole chicane is usually employed to form a bypass region, where the beam axis is transversely shifted first, then translated back to the original axis. In order to generate an isochronous section, quadrupoles are again needed to tune the first order transfer matrix element R{sub 56} equaling zero. Usually sextupoles are needed to correct second order dispersion in the bending plane, for both the dogleg optics and the chicane (with quad) optics. In this paper, an alternative optics design is introduced, which is based on a simple FODO cell and does not need sextupoles assistance to form a second-order achromat. It may provide a similar function of either a dogleg or a bypass, by using 2 or 4 of such combined supercells.

  4. Theory of intertwined orders in high temperature superconductors

    SciTech Connect (OSTI)

    Fradkin, Eduardo; Tranquada, John M.; Kivelson, Steven A.

    2015-03-26

    The electronic phase diagrams of many highly correlated systems, and in particular the cuprate high temperature superconductors, are complex, with many different phases appearing with similarsometimes identicalordering temperatures even as material properties, such as a dopant concentration, are varied over wide ranges. This complexity is sometimes referred to as competing orders. However, since the relation is intimate, and can even lead to the existence of new phases of matter such as the putative pair-density-wave, the general relation is better thought of in terms of intertwined orders. We selectively analyze some of the experiments in the cuprates which suggest that essential aspects of the physics are reflected in the intertwining of multiple ordersnot just in the nature of each order by itself. We also summarize and critique several theoretical ideas concerning the origin and implications of this complexity.

  5. Growing ordered and stable nanostructures on polyhedral nanocrystals

    SciTech Connect (OSTI)

    Lu, L. X.; Bharathi, M. S.; Zhang, Y. W.; Upmanyu, M.

    2014-12-22

    Using both theoretical analysis and phase field simulation, we reveal robust and facile self-assembly routes, which allow the growth of different stable and ordered nanostructures on various polyhedral nanocrystals (NCs) heteroepitaxially. Our studies show that by increasing the NC's size, transitions from formal growth to ordered quantum dots on the facets and further to ordered quantum dots on the corners take place. The predicted morphologies and their transitions are in excellent agreement with existing widely scattered experimental results. Our study presents a facile and potentially practical route for mass-producing hybrid NCs with well-defined size, shape, composition, and architecture.

  6. Method to render second order beam optics programs symplectic

    SciTech Connect (OSTI)

    Douglas, D.; Servranckx, R.V.

    1984-10-01

    We present evidence that second order matrix-based beam optics programs violate the symplectic condition. A simple method to avoid this difficulty, based on a generating function approach to evaluating transfer maps, is described. A simple example illustrating the non-symplectricity of second order matrix methods, and the effectiveness of our solution to the problem, is provided. We conclude that it is in fact possible to bring second order matrix optics methods to a canonical form. The procedure for doing so has been implemented in the program DIMAT, and could be implemented in programs such as TRANSPORT and TURTLE, making them useful in multiturn applications. 15 refs.

  7. Regulatory Burden RFI Executive Order 13563 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Order 13563 Regulatory Burden RFI Executive Order 13563 The situation we described last year (see below) has not improved. We are waiting for additional rules from DOE but don't believe they'll provide the needed relief from regulatory burden. This past year we've invested $250,000 in energy testing. Those resources could have been used to develop new and better products. We expect to invest more dollars in 2012. PDF icon RFI_Exec_Order_13563.pdf More Documents & Publications

  8. Utility: Order (2016-SE-42003) | Department of Energy

    Energy Savers [EERE]

    SE-42003) Utility: Order (2016-SE-42003) March 1, 2016 DOE ordered Utility Refrigerator to pay a $200 civil penalty after finding Utility manufactured and distributed in commerce in the U.S. 1 unit of a Utility brand commercial refrigerator, model PT-R-75-SS-3S-3S-N. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Utility. Federal law subjects manufacturers and private labelers to civil penalties if those parties distribute in the U.S. products that do

  9. Commonwealth of Virginia, State Air Pollution Control Board, Order by

    Energy Savers [EERE]

    Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 | Department of Energy Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Docket No. EO-05-01: This is a Consent Order issued under the authority of Va. Code § § 10.1-1307D and 10.1-1307.1, between the

  10. Compliance Order issued to Los Alamos National Laboratory | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Compliance Order issued to Los Alamos National Laboratory Compliance Order issued to Los Alamos National Laboratory Pursuant to the authority of the Secretary of Energy under section 234B of the Atomic Energy Act of 1954, as amended, and 10 C.F.R. 5 824.4(b) of the Department's Procedural Rules for the Assessment of Civil Penalties for Classzjied Information Security Violations, I am today issuing the enclosed Compliance Order to Los Alamos National Security, LLC (LANS). PDF icon

  11. Maxlite: Order (2010-CE-2701) | Department of Energy

    Office of Environmental Management (EM)

    0-CE-2701) Maxlite: Order (2010-CE-2701) In the Matter of Maxlite, SK America, Inc. (general service flourescent lamps), DOE Case Number 2010-CE-2701, Adopting Order and Compromise Agreement. Order adopting accompanying Compromise Agreement. DOE found that Maxlite failed to submit compliance certifications for its products under 10 C.F.R. Section 430.62, and here assesses a civil penalty of $5,000 (if paid within 30 days) or of $10,000 (if paid between 31-60 days). Maxlite promises to certify

  12. DOE Selects Seven Contractors for Waste Treatment Basic Ordering Agreements

    Office of Environmental Management (EM)

    | Department of Energy Seven Contractors for Waste Treatment Basic Ordering Agreements DOE Selects Seven Contractors for Waste Treatment Basic Ordering Agreements June 4, 2015 - 12:00pm Addthis Media Contact: Lynn Chafin, (513) 246-0461, lynette.chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued seven Basic Ordering Agreements (BOAs) for the treatment of Low-Level Waste (LLW) and Mixed Low-Level Waste (MLLW). The LLW MLLW treatment services also include the

  13. Fagor America: Order (2011-CE-14/1908)

    Broader source: Energy.gov [DOE]

    DOE ordered Fagor America, Inc. to pay a $6,000 civil penalty after finding Fagor America had failed to certify that certain models of refrigerators and dishwashers comply with the applicable energy conservation standards.

  14. Task Order Awarded for Audit and Review Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services.

  15. Second-order model selection in mixture experiments

    SciTech Connect (OSTI)

    Redgate, P.E.; Piepel, G.F.; Hrma, P.R.

    1992-07-01

    Full second-order models for q-component mixture experiments contain q(q+l)/2 terms, which increases rapidly as q increases. Fitting full second-order models for larger q may involve problems with ill-conditioning and overfitting. These problems can be remedied by transforming the mixture components and/or fitting reduced forms of the full second-order mixture model. Various component transformation and model reduction approaches are discussed. Data from a 10-component nuclear waste glass study are used to illustrate ill-conditioning and overfitting problems that can be encountered when fitting a full second-order mixture model. Component transformation, model term selection, and model evaluation/validation techniques are discussed and illustrated for the waste glass example.

  16. ASKO Appliances: Order (2010-CE-04/0614)

    Broader source: Energy.gov [DOE]

    DOE ordered ASKO Appliances, Inc. to pay a $5,000 civil penalty after finding ASKO had failed to certify that certain models of dishwashers and clothes dryers comply with the applicable energy conservation standards.

  17. Department-wide Quick Reaction Work Order System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1981-03-12

    To describe the new Department Wide Quick Reaction Work Order System, to establish the criteria and procedures for its use, and to identify responsibilities for managing and operating the system.

  18. DuraLamp USA: Order (2010-CE-0912)

    Broader source: Energy.gov [DOE]

    DOE ordered DuraLamp USA, Inc. to pay a $2,500 civil penalty after finding DuraLamp USA had failed to certify that model PAR 30, an incandescent reflector lamp, complies with the applicable energy conservation standards.

  19. Westland Sales: Order (2010-CE-03/0411)

    Broader source: Energy.gov [DOE]

    DOE ordered Westland Sales to pay a $5,000 civil penalty after finding Westland Sales had failed to certify that certain models of residential clothes washers and clothes dryers comply with the applicable energy conservation standards.

  20. Consent Order, Uranium Disposition Services, LLC - NCO-2010-01...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Disposition Services, LLC - NCO-2010-01 Consent Order, Uranium Disposition Services, LLC - NCO-2010-01 March 26, 2010 Issued to Uranium Disposition Services, LLC related to ...

  1. Consent Order, Fluor Federal Services - EA-2000-10 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Services - EA-2000-10 Consent Order, Fluor Federal Services - EA-2000-10 July 25, 2000 Issued to Fluor Federal Services related to Quality Problems at the Tank Farm Waste ...

  2. Microsoft Word - FacAgreementand -Consent-Order_FINAL.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Hanford (MSP ver 1.0) Hanford Public Involvement Plan Hanford Federal Facility Agreement and Consent Order This page intentionally left blank November 2012 Page | i Hanford Public Involvement Plan PREFACE ................................................................................................................................................................ - 1 - INTRODUCTION

  3. Revision to DOE Order 435.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management has primary responsibility, within DOE, for DOE Order 435.1, the self-regulation of radioactive waste management. As part of this responsibility, EM has decided to ...

  4. Theory of intertwined orders in high temperature superconductors

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Fradkin, Eduardo; Tranquada, John M.; Kivelson, Steven A.

    2015-03-26

    The electronic phase diagrams of many highly correlated systems, and in particular the cuprate high temperature superconductors, are complex, with many different phases appearing with similar—sometimes identical—ordering temperatures even as material properties, such as a dopant concentration, are varied over wide ranges. This complexity is sometimes referred to as “competing orders.” However, since the relation is intimate, and can even lead to the existence of new phases of matter such as the putative “pair-density-wave,” the general relation is better thought of in terms of “intertwined orders.” We selectively analyze some of the experiments in the cuprates which suggest that essentialmore » aspects of the physics are reflected in the intertwining of multiple orders—not just in the nature of each order by itself. We also summarize and critique several theoretical ideas concerning the origin and implications of this complexity.« less

  5. Westinghouse Lighting: Order (2010-CE-09/1001)

    Broader source: Energy.gov [DOE]

    DOE ordered Westinghouse Lighting Corporation to pay a $50,000 civil penalty after finding Westinghouse Lighting had failed to certify that certain models of general service flourescent and incandescent reflector lamps comply with the applicable energy conservation standards.

  6. DOE Awards Task Order Modification for Support Services to Office...

    Energy Savers [EERE]

    The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and program...

  7. FERC Order No. 2003 Appendix 4 - Facilities Study Agreement ...

    Open Energy Info (EERE)

    4 - Facilities Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 4 - Facilities Study Agreement Abstract FERC...

  8. FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement...

    Open Energy Info (EERE)

    2 - Feasibility Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement Abstract FERC...

  9. FEMP First Thursday Seminar Covers Executive Order 13693 Updates

    Broader source: Energy.gov [DOE]

    This seminar will provide learners with a comprehensive update on Executive Order (E.O.) 13693 provisions related to energy, water, greenhouse gas emissions, electronic stewardship, sustainable purchasing, recycling and waste reduction, and environmental management.

  10. Felix Storch: Order (2010-CE-03/04/0613)

    Broader source: Energy.gov [DOE]

    DOE ordered Felix Storch, Inc. to pay a $5,000 civil penalty after finding Felix Storch had failed to certify that basic model DW 2432, a dishwasher, complies with the applicable energy conservation standards.

  11. New Executive Order Establishes a Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    President Obama signed Executive Order (E.O.) 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input, on January 30, 2015.

  12. Consent Order, Battelle Memorial Institute – WCO-2014-01

    Broader source: Energy.gov [DOE]

    Worker Safety and Health Enforcement Consent Order issued to Battelle Memorial Institute for deficiencies associated with the Chronic Beryllium Disease Prevention Program at DOE’s Pacific Northwest National Laboratory.

  13. Spin dynamics in pressure-induced magnetically ordered phases...

    Office of Scientific and Technical Information (OSTI)

    Spin dynamics in pressure-induced magnetically ordered phases in ( C 4 H 12 N 2 ) Cu 2 Cl 6 Citation Details In-Document Search This content will become publicly available on...

  14. Consent Orders and Settlement Agreements | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    System Issues at the Pantex Plant, (EA-2000-07) April 14, 1998 Consent Order, Kaiser-Hill Company, LLC - EA 98-03 Issued to Kaiser-Hill Company, LLC related to three...

  15. Administrative Order Requiring Compliance and Assessing Civil Penalty

    Broader source: Energy.gov [DOE]

    Administrative Compliance Order No. HWB-14-20 (CO) Pursuant to the New Mexico Hazardous Waste Act ("HWA"), NMSA 1978, Sections 74-4-1 to -14, the Hazardous Waste Bureau ("HWB") of the Environmental Health Division ("Division") of the New Mexico Environmental Department ("NMED") issues this Administrative Compliance Order ("Order") to the United States Department of Energy ("DOE"), and Los Alamos National Security, LLC ("LANS"; collectively, with DOE, the "Respondents"), requiring the Respondents to comply with the terms and conditions of this Order relating to the Los Alamos National Laboratory ("LANL" or "Facility"), and assessing a civil penalty for violations of the HWA, the Hazardous Waste Management Regulations, 20.4.1 NMAC ("HWMR"), and the Facility Permit, EPA I.D. NUMBER NM0890010515-TSDF (Permit").

  16. EZ-FLO International: Order (2010-CW-1401)

    Broader source: Energy.gov [DOE]

    DOE ordered EZ-FLO International, Inc. to pay a $20,000 civil penalty after finding EZ-FLO had failed to certify that certain models of showerhead comply with the applicable water conservation standard.

  17. UT-Battelle Consent Order NCO-2015-02

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Office of Enterprise Assessments Enclosure: Consent Order (NCO-2015-01) cc: Johnny Moore, SC-OSO Michele Branton, SC-OSO Debbie Jenkins, UT-Battelle In the matter of ) Report No. ...

  18. Executive Order 12969-Federal Acquisition and Community RightTo...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2969-Federal Acquisition and Community RightTo-Know Executive Order 12969-Federal Acquisition and Community RightTo-Know The efficiency of the Federal Government is served when it ...

  19. DOE Order 435.1, Radioactive Waste Management

    Broader source: Energy.gov [DOE]

    The objective of this U.S. Department of Energy (DOE) Order is to ensure that all DOE radioactive waste is managed in a manner that is protective of worker and public health and safety and the environment.

  20. Oak Ridge Reservation Compliance Order, September 26, 1995

    Office of Environmental Management (EM)

    Box 2001, Oak Ridge, TN 37831. Go to Table of Contents http:www.em.doe.govffaaorrffca.html 4252001 Oak Ridge Reservation Compliance Order, September 26, 1995 Page 2 of 5...

  1. Air-Con International: Order (2010-SE-0301)

    Broader source: Energy.gov [DOE]

    DOE ordered Air-Con International, Inc. to pay a $10,000 civil penalty after finding Air-Con had imported and distributed in commerce in the U.S. various models of air-conditioning units.

  2. ASKO Appliances: Order (2012-CE-19/2004)

    Broader source: Energy.gov [DOE]

    DOE ordered ASKO Appliances, Inc. to pay a $36,500 civil penalty after finding ASKO had failed to certify that certain models of residential dishwashers and clothes washers comply with the applicable energy and water conservation standards.

  3. De'Longhi USA: Order (2010-CE-2114)

    Broader source: Energy.gov [DOE]

    DOE issued an Order after entering into a Compromise Agreement with De'Longhi USA, Inc. to resolve a case involving the failure to certify that a variety of dehumidifiers comply with the applicable energy conservation standards.

  4. Smeg USA: Order (2011-CE-14/1909)

    Office of Energy Efficiency and Renewable Energy (EERE)

    DOE ordered Smeg USA, Inc. to pay a $6,000 civil penalty after finding Smeg USA had failed to certify that certain models of dishwashers and refrigerators comply with the applicable energy conservation standards.

  5. New Executive Order Establishes a Federal Flood Risk Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register extension notice is at http:www.gpo.govfdsyspkgFR-2015-03-26pdf2015-06879.pdf Addthis Related Articles New Guidelines for Implementing Executive Order 11988,...

  6. Preliminary Notice of Violation and Compliance Order, EA-1999...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Notice of Violation and Compliance Order, EA-1999-04 May 26, 1999 Issued to Fluor Daniel Hanford, Inc., relating to events at the Spent Nuclear Fuels Project, K-Basins...

  7. Separation of High Order Harmonics with Fluoride Windows

    SciTech Connect (OSTI)

    Allison, Tom; van Tilborg, Jeroen; Wright, Travis; Hertlein, Marcus; Falcone, Roger; Belkacem, Ali

    2010-08-02

    The lower orders produced in high order harmonic generation can be effciently temporally separated into monochromatic pulses by propagation in a Fluoride window while still preserving their femtosecond pulse duration. We present calculations for MgF2, CaF2, and LiF windows for the third, fifth, and seventh harmonics of 800 nm. We demonstrate the use of this simple and inexpensive technique in a femtosecond pump/probe experiment using the fifth harmonic.

  8. Nevada Test Site FFCA Consent Order, March 27, 1996 Summary

    Office of Environmental Management (EM)

    Test Site Federal Facility Compliance Act Consent Order, March 27, 1996 State Nevada Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Enforce the STP and establish procedures for reviewing schedules, deleting waste streams, and administrative procedures Parties DOE; Nevada Division of Environmental Protection Date 3/27/1996 SCOPE * Require DOE to achieve compliance with the requirements of the FFCAct through the STP which contains schedules and applicable strategies for

  9. Nevada Test Site FFCA Consent Order, May 10, 1996 Summary

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order (FFACO) State Nevada Agreement Type Federal Facility Agreement and Consent Order Legal Driver(s) FFCAct Scope Summary Identify sites of potential historic contamination and implement proposed corrective actions Parties DOE; Department of Defense (DoD); Nevada Division of Environmental Protection (NDEP) Date 5/10/1996 SCOPE * Identify sites of potential historic contamination and implement proposed corrective actions. * Establish specific sampling and

  10. Oak Ridge Reservation Compliance Order, September 26, 1995 Summary

    Office of Environmental Management (EM)

    Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge

  11. Portsmouth Administrative Consent Order, August 12, 1997 Summary

    Office of Environmental Management (EM)

    US EPA Administrative Consent Order (No. OH7 890 008 983) State Ohio Agreement Type Consent Order Legal Driver(s) RCRA/CERCLA Scope Summary Establish a structure for oversight of DOE activities encouraging expeditious and efficient clean-up of Hazardous Waste/Constituents/Substances present at PORTS. Parties DOE; US EPA; State of Ohio Date 8/12/1997 SCOPE * Establish a structure for oversight of DOE activities encouraging expeditious and efficient clean-up of Hazardous

  12. UniTech Task Order Modifications - DT0010421 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UniTech Task Order Modifications - DT0010421 DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives UniTech Task Order Modifications - DT0010421 Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size 0002 The purpose of this modification is to provide $200,000.00 of incremental funding for the base period, for line item 00001 MSA, PRC,

  13. Observation of Ordered Structures in Counterion Layers near Wet Charged

    Office of Scientific and Technical Information (OSTI)

    Surfaces: A Potential Mechanism for Charge Inversion (Journal Article) | SciTech Connect Observation of Ordered Structures in Counterion Layers near Wet Charged Surfaces: A Potential Mechanism for Charge Inversion Citation Details In-Document Search Title: Observation of Ordered Structures in Counterion Layers near Wet Charged Surfaces: A Potential Mechanism for Charge Inversion Authors: Miller, Mitchell ; Chu, Miaoqi ; Lin, Binhua ; Meron, Mati ; Dutta, Pulak [1] ; NWU) [2] + Show Author

  14. Highly Ordered Tailored Three-Dimensional Hierarchical Porous Gold

    Office of Scientific and Technical Information (OSTI)

    Architectures. (Journal Article) | SciTech Connect Journal Article: Highly Ordered Tailored Three-Dimensional Hierarchical Porous Gold Architectures. Citation Details In-Document Search Title: Highly Ordered Tailored Three-Dimensional Hierarchical Porous Gold Architectures. Abstract not provided. Authors: Polsky, Ronen ; Brozik, Susan Marie ; Washburn, Cody M. ; Wheeler, David Roger ; Burckel, David Bruce ; sattayasamtsathit, sirilak ; OMahony, Aoife ; Gao, Wei ; Minteer, Shelley ; Cha,

  15. Lattice Quantum Chromodynamics (SPI, mapping, site ordering, and QPX in

    Office of Scientific and Technical Information (OSTI)

    Lattice QCD code on Mira): ALCF-2 Early Science Program Technical Report (Technical Report) | SciTech Connect Lattice Quantum Chromodynamics (SPI, mapping, site ordering, and QPX in Lattice QCD code on Mira): ALCF-2 Early Science Program Technical Report Citation Details In-Document Search Title: Lattice Quantum Chromodynamics (SPI, mapping, site ordering, and QPX in Lattice QCD code on Mira): ALCF-2 Early Science Program Technical Report Authors: Na, H. [1] ; Osborn, J. [1] + Show Author

  16. Parsons Infrastructure & Technology Group, Inc., Consent Order | Department

    Office of Environmental Management (EM)

    of Energy Parsons Infrastructure & Technology Group, Inc., Consent Order Parsons Infrastructure & Technology Group, Inc., Consent Order "The Office of Health, Safety and Security's Office of Enforcement has completed its investigation into the facts and circumstances associated with construction deficiencies at the Salt Waste Processing Facility (SWPF) located at the U.S. Department of Energy (DOE) Savannah River Site. The investigation addressed specific areas of potential

  17. Executive Order 12088: Federal Compliance with Pollution Control Standards

    Energy Savers [EERE]

    | Department of Energy 2088: Federal Compliance with Pollution Control Standards Executive Order 12088: Federal Compliance with Pollution Control Standards The head of each Executive agency is responsible for ensuring that all necessary actions are taken for the prevention, control, and abatement of environmental pollution with respect to Federal facilities and activities under the control of the agency. PDF icon Executive Order 12088: Federal Compliance with Pollution Control Standards More

  18. Executive Order 13272; Consideration of Small Entities in Agency Rulemaking

    Energy Savers [EERE]

    | Department of Energy 272; Consideration of Small Entities in Agency Rulemaking Executive Order 13272; Consideration of Small Entities in Agency Rulemaking notice of procedures and policies on consideration of small entities in rulemaking PDF icon Executive Order 13272; Consideration of Small Entities in Agency Rulemaking More Documents & Publications Policy Flash 2016-09 ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps,

  19. A consistent second order projection scheme for simulating transient

    Office of Scientific and Technical Information (OSTI)

    viscous flow with Smoothed Particle Hydrodynamics. (Journal Article) | SciTech Connect A consistent second order projection scheme for simulating transient viscous flow with Smoothed Particle Hydrodynamics. Citation Details In-Document Search Title: A consistent second order projection scheme for simulating transient viscous flow with Smoothed Particle Hydrodynamics. Abstract not provided. Authors: Trask, Nathaniel ; Maxey, Martin ; Kim, Kyungjoo ; Perego, Mauro ; Parks, Michael L. ; Yang,

  20. DOE Sustainability Support Information Brief on Executive Order 12898,

    Energy Savers [EERE]

    Federal Actions to Address Environmental Justice in Minority and Low-Income Populations | Department of Energy DOE Sustainability Support Information Brief on Executive Order 12898, Federal Actions to Address Environmental Justice in Minority and Low-Income Populations DOE Sustainability Support Information Brief on Executive Order 12898, Federal Actions to Address Environmental Justice in Minority and Low-Income Populations November, 2012 HS-21-IB-2012-28 This Sustainability Support