Powered by Deep Web Technologies
Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Temporary Sealing of Fractures | Open Energy Information  

Open Energy Info (EERE)

Temporary Sealing of Fractures Temporary Sealing of Fractures Jump to: navigation, search Contents 1 Geothermal Lab Call Projects for Temporary Sealing of Fractures 2 Geothermal ARRA Funded Projects for Temporary Sealing of Fractures Geothermal Lab Call Projects for Temporary Sealing of Fractures Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026

2

Apparatus for restraining and transporting dies  

DOE Patents (OSTI)

Apparatus for restraining and transporting dies in punch press operations is provided. A floatation platen for supporting a die on the platen's upper surface has a plurality of recessed gas exhaust ports on the platen's lower surface. A source of pressurized gas delivers gas to a platen manifold, for delivery to orifices located in the gas exhaust ports. The flow of gas is controlled by a first valve adjacent the gas source and a second valve adjacent the manifold, with the second valve being used to control the gas flow during movement of the die. In this fashion, a die may be moved on a cushion of air from one workstation to a selected second workstation. A moveable hydraulically operated restraining fixture is also provided, for clamping the die in position during the compacting phase, and for releasing the die after completion of the compacting phase by releasing the hydraulic pressure on the restraining fixture. When pressure in the hydraulic cylinders on the restraining fixture is reversed, the restraining fixture will retract so that there is no contact between the die and the restraining fixture, thereby allowing the die to be removed from a first workstation and moved to a second selected workstation.

Allison, James W. (Monroeville, PA); LaBarre, Timothy L. (Pittsburgh, PA)

1994-01-01T23:59:59.000Z

3

Temporary Appointments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Temporary Appointments Temporary Appointments Temporary Appointments A temporary appointment is a non-permanent time limited appointment for a period of 1 year. It can be extended up to the maximum of one year (total 24 months). After the first year, the appointment allows eligibility for health benefits coverage. The employee pays the full cost for the health benefits. Reasons for making a temporary appointment include but are not limited to: short term position (less than 1 year), reorganization, contracting of function, anticipated reduction in funding, or the need to place permanent employees who would otherwise be displaced from other parts of the organization. An agency can not fill a position by temporary appointment if that position has previously been filled by temporary appointment(s) for a period of 2

4

ORDER  

Office of Legacy Management (LM)

system. a. Development. Written plans, orders and procedures covering FPF routine, emergency, and administrative duties; tactical deployment; and where required, other...

5

A thermal active restrained shrinkage ring test to study the early age concrete behaviour of massive structures  

Science Conference Proceedings (OSTI)

In massive concrete structures, cracking may occur during hardening, especially if autogenous and thermal strains are restrained. The concrete permeability due to this cracking may rise significantly and thus increase leakage (in tank, nuclear containment...) and reduce the durability. The restrained shrinkage ring test is used to study the early age concrete behaviour (delayed strains evolution and cracking). This test shows, at 20 {sup o}C and without drying, for a concrete mix which is representative of a French nuclear power plant containment vessel (w/c ratio equal to 0.57), that the amplitude of autogenous shrinkage (about 40 {mu}m/m for the studied concrete mix) is not high enough to cause cracking. Indeed, in this configuration, thermal shrinkage is not significant, whereas this is a major concern for massive structures. Therefore, an active test has been developed to study cracking due to restrained thermal shrinkage. This test is an evolution of the classical restrained shrinkage ring test. It allows to take into account both autogenous and thermal shrinkages. Its principle is to create the thermal strain effects by increasing the temperature of the brass ring (by a fluid circulation) in order to expand it. With this test, the early age cracking due to restrained shrinkage, the influence of reinforcement and construction joints have been experimentally studied. It shows that, as expected, reinforcement leads to an increase of the number of cracks but a decrease of crack widths. Moreover, cracking occurs preferentially at the construction joint.

Briffaut, M. [LMT/ENS Cachan/CNRS UMR8535/UPMC/PRES UniverSud Paris, Cachan (France); Institut de radioprotection et de surete nucleaire, Fontenay-aux-Roses (France); Benboudjema, F. [LMT/ENS Cachan/CNRS UMR8535/UPMC/PRES UniverSud Paris, Cachan (France); Torrenti, J.M., E-mail: jean-michel.torrenti@lcpc.f [Universite Paris Est, Laboratoire central des ponts et chaussees, Paris (France); Nahas, G. [LMT/ENS Cachan/CNRS UMR8535/UPMC/PRES UniverSud Paris, Cachan (France); Institut de radioprotection et de surete nucleaire, Fontenay-aux-Roses (France)

2011-01-15T23:59:59.000Z

6

ORDER  

NLE Websites -- All DOE Office Websites (Extended Search)

Approved: 6-27-2011 PROTECTION PROGRAM OPERATIONS U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security DOE O 473.3 DOE O 473.3 1 6-27-11 PROTECTION PROGRAM OPERATIONS 1. PURPOSE. This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. The order does this by combining into one Protection Program Operations (PPO) order the baseline requirements which were contained in the manuals for physical protection, CPF, and FPF. This Order establishes requirements for the physical protection of interests under DOE's purview ranging from facilities, buildings,

7

ORDER  

Office of Legacy Management (LM)

for intelligence-related activities. i. DOE O 226.1A, Implementation of Department of Energy Oversight Policy, dated 7-31-07. This Order contains requirements and...

8

SHORT CIRCUIT CALCULATION (TEMPORARY POWER)  

SciTech Connect

The purpose and objective of this calculation is to determine the momentary and interrupting duty on the breakers, for 69kV temporary power only.

Yuri Shane

1995-07-24T23:59:59.000Z

9

ORDER  

NLE Websites -- All DOE Office Websites (Extended Search)

Approved: 7-21-2011 SAFEGUARDS AND SECURITY PROGRAM U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security DOE O 470.4B DOE O 470.4B 1 7-21-11 SAFEGUARDS AND SECURITY PROGRAM 1. PURPOSE. To establish responsibilities for the U.S. Department of Energy (DOE) Safeguards and Security (S&S) Program, and to establish program planning and management requirements for the S&S Program. The requirements identified in this Order and its attachments and appendices are based on national policy promulgated in laws, regulations, Executive Orders, and national standards to prevent unacceptable adverse impacts on national security, the health and safety of DOE and contractor employees, the public, or the environment. 2. CANCELLATIONS. DOE O 470.4A, Safeguards and Security Program, dated 5-25-07;

10

ORDER  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE O 475.2A Approved: 2-1-11 IDENTIFYING CLASSIFIED INFORMATION U.S. DEPARTMENT OF ENERGY Office of Health, Safety and Security DOE O 475.2A 1 2-1-11 IDENTIFYING CLASSIFIED INFORMATION 1. PURPOSE. To establish the program to identify information classified under the Atomic Energy Act [Restricted Data (RD), Formerly Restricted Data (FRD), and Transclassified Foreign Nuclear Information (TFNI)] or Executive Order (E.O.) 13526 [National Security Information (NSI)], so that it can be protected against unauthorized dissemination. 2. CANCELLATION. DOE O 475.2, Identifying Classified Information, dated 8-28-07, and DOE M 475.1-1B, Manual for Identifying Classified Information, dated 8-28-07. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

11

ORDER  

Office of Legacy Management (LM)

3-2010 3-2010 SCIENTIFIC AND TECHNICAL INFORMATION MANAGEMENT U.S. DEPARTMENT OF ENERGY Office of Scientific and Technical Information DOE O 241.1B DOE O 241.1B 1 12-13-2010 SCIENTIFIC AND TECHNICAL INFORMATION MANAGEMENT 1. PURPOSE. The U.S. Department of Energy (DOE) produces scientific and technical information (STI) in the course of performing research and development (R&D) and other science and technology activities. The purpose of this directive is to ensure that STI is appropriately managed as part of the DOE mission to enable the advancement of scientific knowledge and technological innovation. Therefore, the objectives of this order are to: a. establish DOE requirements and responsibilities to ensure that Departmental STI

12

ORDER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP&L EnergyPlus Company PP&L EnergyPlus Company Order No. EA-210 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 4, 1999, PP&L EnergyPlus Company (PP&L EnergyPlus) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. PP&L EnergyPlus, a limited liability company based in Pennsylvania, does not own or control any electric generating or transmission facilities, nor does it have a franchised service area. PP&L EnergyPlus proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export this energy on its own behalf to Canada.

13

Student Temporary Employment Program | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Employment Program Student Temporary Employment Program The Student Temporary Employment Program (STEP) is the perfect work-study combination for high school through graduate...

14

EIA-809 WEEKLY OXYGENATE REPORT INSTRUCTIONS  

U.S. Energy Information Administration (EIA)

component of the Department of Energy (DOE); to any ... temporary restraining order or a preliminary or permanent injunction without bond.

15

EIA-805 WEEKLY BULK TERMINAL AND BLENDER REPORT INSTRUCTIONS  

U.S. Energy Information Administration (EIA)

component of the Department of Energy (DOE); ... violations which may result in a temporary restraining order or a preliminary or permanent injunction without bond.

16

EIA-888 ON-HIGHWAY DIESEL FUEL PRICE SURVEY INSTRUCTIONS  

U.S. Energy Information Administration (EIA)

U. S. DEPARTMENT OF ENERGY. ENERGY INFORMATION ADMINISTRATION . Washington, D. C. 20585. ... violations which may result in a temporary restraining order or a

17

The Temporary Assistance for Needy Families Program  

E-Print Network (OSTI)

nberwelf2_ms The Temporary Assistance for Needy Families (TANF) program was created in 1996 from what was previously named the Aid to Families with Dependent Children (AFDC) program. The TANF program is intended to serve low-income families, primarily those with only a single parent present, as did the AFDC program. The TANF program is distinguished from AFDC by strong work requirements, time limits on receipt, options for the provision of noncash assistance, and by a block grant financing structure. This paper reviews the rules of the TANF program and the research that has been conducted on it and on the AFDC program. The Temporary Assistance for Needy Families (TANF) program was created by legislation passed by the U.S. Congress and signed by the President in 1996. The Personal Responsibility and Work Reconciliation Act (PRWORA) created the TANF program out of the preexisting Aid to Families with Dependent Children (AFDC) program, which itself was created

Robert A. Moffitt

2003-01-01T23:59:59.000Z

18

Protecting Against Surges and Temporary Overvoltages  

Science Conference Proceedings (OSTI)

The electrical grid plays host to an array of electrical disturbances. Overvoltages impinging upon residential, commercial, and industrial facilities are some of the most threatening types. The two main types of overvoltages are surges and temporary overvoltages (TOVs). The category surge has several subcategories, such as ring-wave surges (typically generated within industrial facilities) and impulsive surges (mostly associated with lightning). Ring-wave surges typically do not cause damage to equipment...

2011-12-30T23:59:59.000Z

19

Experimental Tests of a Real Building Seismically Retrofitted by Special Buckling-Restrained Braces  

SciTech Connect

Buckling Restrained Braces (BRBs), differently from conventional braces, do not exhibit appreciable difference between the tensile and compression capacity and no strength degradation of brace capacity under compressive and cyclic loading. Since lateral and local buckling behaviour modes are restrained, large inelastic capacities are attainable. Hence, BRBs may represent an efficient and reliable solution for reducing the seismic vulnerability of buildings. Results of experimental tests on the response of a real two-story reinforced concrete (RC) building equipped with BRBs are presented and discussed. The considered BRBs are a special 'only-steel' version of the more common 'unbonded braces'. In particular, two different BRBs have been tested. Both of them are detachable 'only-steel' devices, consisting in a rectangular steel plate and a restraining steel sleeve. The latter is composed by two omega shapes which are bolted together. The main characteristic of the braces consists in the possibility to hide them within the space between the facing and the backing of masonry infill walls commonly used for RC buildings.

D'Aniello, Mario; Della Corte, Gaetano; Mazzolani, Federico M. [University of Naples Federico II, Dept. of Structural Engineering-Naples (Italy)

2008-07-08T23:59:59.000Z

20

Temporary Emergency Exposure Limits for Chemicals: Methods and Practice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-HDBK-1046-2008 August 2008 DOE HANDBOOK TEMPORARY EMERGENCY EXPOSURE LIMITS FOR CHEMICALS: METHODS AND PRACTICE U.S. Department of Energy AREA EMER Washington, D.C. 20585 DOE-HDBK-1046-2008 ii DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-1046-2008 iii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.energy.gov/nuclearsafety/techstds/ DOE-HDBK-1046-2008 iv FOREWORD In 2005, the Office of Emergency Management and Policy (NA-41) within the National Nuclear Security Administration (NNSA), U.S. Department of Energy (DOE), issued DOE O 151.1C, Comprehensive Emergency Management System. This order, and its Guides issued in 2007, reference Acute Exposure Guideline Levels (AEGLs) and Emergency Response Planning

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

100-N temporary construction line considerations  

SciTech Connect

Present thinking and planning appears to be developing from the following factors as concern the 13.8 KV temporary construction power limit. 1. It is understood that the present intent is to supply 100-N operating requirements from a single stub source in the 230 KV loop. 2. The original thoughts were to obtain construction power over a 13.8 KV line from 151-D substation. 3. Construction load requirements are now less than originally planned since steam has been substituted for electrical drive of primary loop pumps and 5500 hp motor tests are no longer necessary. 4. An extreme emergency backup source for the K plants has always been of concern, although minimized in recent planning. It is desirable to review the temporary construction line requirements from a future operating viewpoint to determine if the line could be useful to the operating plants after completion of construction. It is highly desirable to provide T.C. power source from K plants rather than 151-D and then leave the line and breakers in place for future maintenance assistance and as extreme emergency backup to K plants.

Mollerus, F.J.

1958-12-30T23:59:59.000Z

22

Temporary fire sealing of penetrations on TFTR  

DOE Green Energy (OSTI)

The radiation shielding provided for TFTR for D-D and D-T operation will be penetrated by numerous electrical and mechanical services. Eventually, these penetrations will have to be sealed to provide the required fire resistance, tritium sealability, pressure integrity and radiation attenuation. For the initial hydrogen operation, however, fire sealing of the penetrations in the walls and floor is the primary concern. This report provides a discussion of the required and desirable properties of a temporary seal which can be used to seal these penetrations for the hydrogen operation and then subsequently be removed and replaced as required for the D-D and D-T operations. Several candidate designs are discussed and evaluated and recommendations are made for specific applications.

Hondorp, H.L.

1981-02-01T23:59:59.000Z

23

Temporary Grounding and Bonding Practices in Nuclear Electric Generating Stations  

Science Conference Proceedings (OSTI)

Correct written temporary grounding practices inside generating stations are an important industrial safety issue, as well as an important plant status control issue. An extraordinary amount of regulations, standards, and information is available for temporary grounding practices in transmission and delivery (T&D), but very little is written about inside plant practices.

2008-12-22T23:59:59.000Z

24

Temporary Cementitious Sealers in Enhanced Geothermal Systems  

DOE Green Energy (OSTI)

Unlike conventional hydrothennal geothermal technology that utilizes hot water as the energy conversion resources tapped from natural hydrothermal reservoir located at {approx}10 km below the ground surface, Enhanced Geothermal System (EGS) must create a hydrothermal reservoir in a hot rock stratum at temperatures {ge}200 C, present in {approx}5 km deep underground by employing hydraulic fracturing. This is the process of initiating and propagating a fracture as well as opening pre-existing fractures in a rock layer. In this operation, a considerable attention is paid to the pre-existing fractures and pressure-generated ones made in the underground foundation during drilling and logging. These fractures in terms of lost circulation zones often cause the wastage of a substantial amount of the circulated water-based drilling fluid or mud. Thus, such lost circulation zones must be plugged by sealing materials, so that the drilling operation can resume and continue. Next, one important consideration is the fact that the sealers must be disintegrated by highly pressured water to reopen the plugged fractures and to promote the propagation of reopened fractures. In response to this need, the objective of this phase I project in FYs 2009-2011 was to develop temporary cementitious fracture sealing materials possessing self-degradable properties generating when {ge} 200 C-heated scalers came in contact with water. At BNL, we formulated two types of non-Portland cementitious systems using inexpensive industrial by-products with pozzolanic properties, such as granulated blast-furnace slag from the steel industries, and fly ashes from coal-combustion power plants. These byproducts were activated by sodium silicate to initiate their pozzolanic reactions, and to create a cemetitious structure. One developed system was sodium silicate alkali-activated slag/Class C fly ash (AASC); the other was sodium silicate alkali-activated slag/Class F fly ash (AASF) as the binder of temper-try sealers. Two specific additives without sodium silicate as alkaline additive were developed in this project: One additive was the sodium carboxymethyl cellulose (CMC) as self-degradation promoting additive; the other was the hard-burned magnesium oxide (MgO) made from calcinating at 1,000-1,500 C as an expansive additive. The AASC and AASF cementitious sealers made by incorporating an appropriate amount of these additives met the following six criteria: 1) One dry mix component product; 2) plastic viscosity, 20 to 70 cp at 300 rpm; 3) maintenance of pumpability for at least 1 hour at 85 C; 4) compressive strength >2000 psi; 5) self-degradable by injection with water at a certain pressure; and 6) expandable and swelling properties; {ge}0.5% of total volume of the sealer.

Sugama T.; Pyatina, T.; Butcher, T.; Brothers, L.; Bour, D.

2011-12-31T23:59:59.000Z

25

Chapter_2_Limited_Areas_Vault-Type_Rooms_and_Temporary_Limited_Areas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Limited Areas, VTRs, and Temporary Limited Areas Chapter 2 describes the security procedures adopted by DOE HQ to implement the requirements of the following DOE directives: * DOE Order 473.3, Protection Program Operations * DOE Order 471.6, Change 1, Information Security * DOE Order 475.2A, Identifying Classified Information * Classification Bulletin TNP-32, Classification Guidance for Classified Meeting Locations at DOE/NNSA or DOE/NNSA Contractor Sites or Facilities, dated May 27, 2010 DOE Manual 470.4-2A, Physical Protection, defines seven types of Security Areas that protect DOE employees, facilities, buildings, government property, classified information, nuclear materials and other security interests. Each type of Security Area has its own security

26

Surveillance Guide - CMS 3.3 CMS 3.4 Temporary Changes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEMPORARY CHANGES TEMPORARY CHANGES 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's program for controlling temporary changes to the facility. Such changes include temporary modifications, temporary procedure changes, and tests or experiments. The Facility Representative reviews the status of temporary modifications, distribution of temporary procedure changes, and examines tests or experiments. 2.0 References 2.1 DOE 5700.6C, Quality Assurance 2.2 DOE-STD-1073-93, Guide for Operational Configuration Management 3.0 Requirements Implemented This surveillance is conducted to implement requirements CM-0009 and CM-0011 from the RL S/RID. These requirements are derived from

27

ARM: 10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm  

DOE Data Explorer (OSTI)

10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm

Chitra Sivaraman; Connor Flynn

28

ARM: 10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm  

DOE Data Explorer (OSTI)

10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm

Chitra Sivaraman; Connor Flynn

29

ARM: 10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm  

SciTech Connect

10-minute TEMPORARY Raman Lidar: aerosol scattering ratio and backscattering coefficient profiles, from first Ferrare algorithm

Chitra Sivaraman; Connor Flynn

2010-12-15T23:59:59.000Z

30

ARM: 10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm  

SciTech Connect

10-minute TEMPORARY Raman Lidar: aerosol extinction profiles and aerosol optical thickness, from first Ferrare algorithm

Chitra Sivaraman; Connor Flynn

2010-12-15T23:59:59.000Z

31

order form  

NLE Websites -- All DOE Office Websites (Extended Search)

Customer Order Form Customer Order Form Fermilab Education Office - Customer Order Form PO BOX 500, MS 777, Batavia, IL 60510 * ph. 630-840-8258 * fax 630-840-2500 * avarry@fnal.gov Date: This order be: SHIPPED PICKED UP? Bill to: Ship to: Contact/Institution name: Email: Phone: Fax: Payment method (please circle): Visa/MasterCard - Check - Purchase Order  Visa/MasterCard # P.O. # Exp Date: Quantity Ordered Item Name Item Description (color, size, etc.) Price Each Total Amount  For purchases over $200 only *IL residents ONLY: Add 7.5% sales tax to your order.

32

Application for a Temporary Water Use Permit for more than 10...  

Open Energy Info (EERE)

for a Temporary Water Use Permit for more than 10 Acre Feet, or for Longer than One Year Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material:...

33

Application for a Temporary Water Use Permit for Up to 10 Acre...  

Open Energy Info (EERE)

GEOTHERMAL ENERGYGeothermal Home Reference Material: Application for a Temporary Water Use Permit for Up to 10 Acre Feet and Up to One Year Details Activities (0) Areas (0)...

34

Temporary Losses of Highway Capacity and Impacts on Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Temporary Losses of Highway Capacity and Impacts on Performance May 2002 Prepared by S. M. Chin O. Franzese D. L. Greene H. L. Hwang Oak Ridge National Laboratory Oak Ridge, Tennessee R. C. Gibson The University of Tennessee Knoxville, Tennessee DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge: Web site: http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source: National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-605-6000 (1-800-553-6847) TDD: 703-487-4639 Fax: 703-605-6900 E-mail: info@ntis.fedworld.gov

35

GRR/Section 19-TX-e - Temporary Surface Water Permit | Open Energy  

Open Energy Info (EERE)

-TX-e - Temporary Surface Water Permit -TX-e - Temporary Surface Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-TX-e - Temporary Surface Water Permit 19-TX-e Temporary Surface Water Permit.pdf Click to View Fullscreen Contact Agencies Texas Commission on Environmental Quality Regulations & Policies Tex. Water Code § 11.138 Triggers None specified Click "Edit With Form" above to add content 19-TX-e Temporary Surface Water Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Texas, the Texas Commission on Environmental Quality (TCEQ), or in certain instances regional TCEQ offices or local Watermasters, issue

36

Proliferation of Estrogen Receptor alpha Positive Mammary Epithelial Cells is Restrained by TGFbeta1 in Adult Mice  

SciTech Connect

Transforming growth factor {beta}1 (TGF{beta}1) is a potent inhibitor of mammary epithelial proliferation. In human breast, estrogen receptor {alpha} (ER{alpha}) cells rarely co-localize with markers of proliferation, but their increased frequency correlates with breast cancer risk. To determine whether TGF{beta}1 is necessary for the quiescence of ER{alpha}-positive population, we examined mouse mammary epithelial gland at estrus. Approximately 35% of cells showed TGF{beta}1 activation, which co-localized with nuclear receptor-phosphorylated Smad 2/3, indicating that TGF{beta} signaling is autocrine. Furthermore, nuclear Smad co-localized with nuclear ER{alpha}. To test whether TGF{beta} was functional, we examined genetically engineered mice with different levels of TGF{beta}1. ER{alpha} co-localization with markers of proliferation (i.e. Ki-67 or BrdU) at estrus was significantly increased in the mammary glands of Tgf{beta}1 C57/bl/129SV heterozygote mice. This relationship was maintained following pregnancy, but was absent at puberty. Conversely, mammary epithelial expression of constitutively active TGF{beta}1 via the MMTV promoter suppressed proliferation of ER{alpha} positive cells. Thus, TGF{beta}1 activation functionally restrains ER{alpha} positive cells from proliferating in adult mammary gland. Accordingly, we propose that TGF{beta}1 dysregulation may promote proliferation of ER{alpha} positive cells associated with breast cancer risk in humans.

Ewan, Kenneth B.R.; Oketch-Rabah, Hellen A.; Ravani, Shraddha A.; Shyamala, G.; Moses, Harold L.; Barcellos-Hoff, Mary Helen

2005-03-03T23:59:59.000Z

37

Summary Audit Report on Contractor Employee Relocation and Temporary Living Costs, IG-0400  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE: January 27, 1997 DATE: January 27, 1997 REPLY TO ATTN OF: IG-1 SUBJECT: INFORMATION: Summary Audit Report on Contractor Employee Relocation andTemporary Living Costs TO: The Acting Secretary This summary report highlights systemic problems with contractor charges for contractor employee relocation and temporary living costs. Over the past 5 years, the Office of Inspector General issued nine audit reports that identified unreasonable and unallowable charges for employee relocation and temporary living costs by contractors and their subcontractors. We found that contractors were reimbursed for these costs because the Department of Energy (Department) did not use clearly defined contract provisions

38

Mobile integrated temporary utility system. Innovative technology summary report  

Science Conference Proceedings (OSTI)

The Mobile Integrated Temporary Utility System (MITUS) integrates portable electrical power along with communications and emergency alarm and lighting capabilities to provide safe, centralized power to work areas that need to be de-energized for decommissioning work. MITUS consists of a portable unit substation; up to twenty portable kiosks that house the power receptacles, communications, and emergency alarm and lighting systems; and a central communications unit. This system makes sequential decommissioning efforts efficient and cost-effective by allowing the integrated system to remain intact while being moved to subsequent work sites. Use of the MITUS also eliminates the need to conduct zero-energy tests and implement associated lock-out/tag-out procedures at partially de-energized facilities. Since the MITUS is a designed system, it can be customized to accommodate unique facility conditions simply by varying kiosks and transformer configurations. The MITUS is an attractive alternate to the use of portable generators with stand-alone communications and emergency system. It is more cost-effective than upgrading or reconfiguring existing power distribution systems.

NONE

1998-12-01T23:59:59.000Z

39

HQFMSP Chapter 2, Limited Areas, Valut-Type Rooms and Temporary Limited  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Limited Areas, Valut-Type Rooms and Temporary 2, Limited Areas, Valut-Type Rooms and Temporary Limited Areas HQFMSP Chapter 2, Limited Areas, Valut-Type Rooms and Temporary Limited Areas October 2013 2013 Headquarters Facilities Master Security Plan - Chapter 2, Limited Areas, Valut-Type Rooms and Temporary Limited Areas This chapter covers the establishment, maintenance, and termination of areas within HQ buildings where classified activities take place. It covers the requirements applicable to each type of security area, including physical protection measures, controls on the use of electronic devices, restrictions on what security activities can take place, and what security equipment must be present. The procedures in this chapter were developed and are maintained jointly by HS-91 and the Office of Information Security

40

Appropriate technology water treatment processes for MaeLa Temporary Shelter, Thailand  

E-Print Network (OSTI)

This thesis recommends the use of horizontal-flow roughing filters to treat spring water of variable annual quality in MaeLa Temporary Shelter, Thailand. The public drinking water system for 45,000 refugees is overseen by ...

Vater, Katherine Ann

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Effects of Temporary Overvoltage on Residential Products: System Compatibility Research Project  

Science Conference Proceedings (OSTI)

Temporary overvoltage can have deleterious effects on electronic equipment. It is possible for the effects to be either immediate, as in the case of stress beyond a component's ability to withstand the voltage, or long-term, such as slow degradation brought on by long-term heating. This report contains results of three complementary areas of research conducted in 2004 concerning effects of temporary overvoltage (TOV) on common residential electrical and electronic devices. Research included a study of th...

2005-03-14T23:59:59.000Z

42

GRR/Section 19-AK-b - Temporary Use of Water Permit | Open Energy  

Open Energy Info (EERE)

9-AK-b - Temporary Use of Water Permit 9-AK-b - Temporary Use of Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-AK-b - Temporary Use of Water Permit 19AKBTemporaryUseOfWaterPermit.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Water Use Act Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 19AKBTemporaryUseOfWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative In Alaska, water is declared a public resource belonging to the people of

43

GRR/Section 4-NV-b - Temporary Use of Ground Water for Exploration | Open  

Open Energy Info (EERE)

b - Temporary Use of Ground Water for Exploration b - Temporary Use of Ground Water for Exploration < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-NV-b - Temporary Use of Ground Water for Exploration 04NVBTemporaryUseOfGroundWaterForExploration.pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Regulations & Policies NAC 534.444 Waiver to use water to explore for oil, gas or geothermal resources Triggers None specified Click "Edit With Form" above to add content 04NVBTemporaryUseOfGroundWaterForExploration.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Water Resources (NDWR) may grant a waiver of the

44

EVALUATION OF THE TEMPORARY TENT COVER TRUSS SYSTEM AP PRIMARY VENT SYSTEM  

SciTech Connect

The purpose of this calculation is to evaluate a temporary ten cover truss system. This system will be used to provide weather protection to the workers during replacement of the filter for the Primary Ventilation System in AP Tank Farm. The truss system has been fabricated utilizing tubes and couplers, which are normally used for scaffoldings.

HAQ MA

2009-12-31T23:59:59.000Z

45

Portals to an Architecture: Design of a temporary structure with paper tube arches Steven J. Preston  

E-Print Network (OSTI)

containers and large paper tubes to create a 56,000 square- foot (5200 square-meter) space [10]. In 2008, and low cost. Spirally wound paper tubes are highly engineered structural products made of different for both per- manent and temporary structures. Less frequently, paper tubes have been utilized in curved

Bank, Lawrence C.

46

Underwater temporary threshold shift in pinnipeds: Effects of noise level and duration  

E-Print Network (OSTI)

Underwater temporary threshold shift in pinnipeds: Effects of noise level and duration David Kastak psychophysical techniques were used to evaluate the residual effects of underwater noise on the hearing , amplified Realis- tic MPA-20 , and projected from one of two underwater transducers NUWC J-9 or Lubell

Reichmuth, Colleen

47

Underwater temporary threshold shift induced by octave-band noise in three species of pinniped  

E-Print Network (OSTI)

Underwater temporary threshold shift induced by octave-band noise in three species of pinniped at center frequency . Each subject was trained to dive into a noise field and remain stationed underwater airborne. When human divers were tested underwater, for instance, the resultant levels of TTS were much

Reichmuth, Colleen

48

Transportation energy contingency planning: financing emergency transit services with temporary fare surcharges  

SciTech Connect

The feasibility of using a temporary fare surcharge as a source of additional operating revenue for transit agencies during an energy crisis is examined. The characteristics of a temporary surcharge proposal, including the general advantages and disadvantages of the surcharge, are discussed. Using data from the Municipality of Metropolitan Seattle, two representative scenarios were developed on the assumption that Seattle Metro would consider imposing a temporary surcharge during an energy crisis. The first scenario assumes Seattle Metro would impose a surcharge to cover the increased costs of operating its base service. The second one assumes a more severe energy crisis which would encourage Seattle Metro to provide peak overload service. Under this scenario, Seattle Metro would impose a surcharge to cover the increased costs of operating its base service and the total overload service operating costs. Background information on Seattle Metro, including their experience with previous energy crisis is presented. The scenario details and conclusions are followed by a discussion of the limitations of a temporary fare surcharge.

Felice,C.; Larson, A.

1982-12-01T23:59:59.000Z

49

GIS representation and assessment of water distribution system for Mae La Temporary Shelter, Thailand  

E-Print Network (OSTI)

ArcGIS is used to analyze water access in Mae La, Thailand, home to 45,000 residents living as refugees in a temporary camp. Drinking water for the shelter is supplied at public tap stands while water for hygienic purposes ...

Harding, Mary Pierce

2008-01-01T23:59:59.000Z

50

Floating plant for offshore liquefaction, temporary storage and loading of LNG  

SciTech Connect

A floating plant is disclosed for offshore liquefaction, temporary storage and loading of lng, made as a semi-submersible platform with storage tanks for lng arranged in the submerged section of the platform. The storage tanks are independent spherical tanks which are supported inside the submerged section of the platform and completely surrounded thereby.

Kvamsdal, R.

1980-05-13T23:59:59.000Z

51

Application for a Temporary Water Use Permit for Up to 10 Acre Feet and Up  

Open Energy Info (EERE)

Up to 10 Acre Feet and Up Up to 10 Acre Feet and Up to One Year Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Application for a Temporary Water Use Permit for Up to 10 Acre Feet and Up to One Year Details Activities (0) Areas (0) Regions (0) Abstract: Unavailable Author(s): Unknown Published: TCEQ, Date Unknown Document Number: Unavailable DOI: Unavailable Source: View Original Document Retrieved from "http://en.openei.org/w/index.php?title=Application_for_a_Temporary_Water_Use_Permit_for_Up_to_10_Acre_Feet_and_Up_to_One_Year&oldid=648773" Category: Reference Materials What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

52

NNSA orders security enhancements  

NLE Websites -- All DOE Office Websites (Extended Search)

orders security enhancements NNSA orders security enhancements Because of this government order, until further notice all vehicles entering government property will be required to...

53

Guidelines for Reduced Seismic Loads to Assess Temporary Conditions in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Utilities do not have uniform guidelines and criteria to treat plant temporary conditions (TCs) or planned changes to safety-related systems. Regulatory review and acceptance criteria and guidelines tend to be overly conservative, leading to costly measures. This report proposes a risk-informed procedure for evaluating TCs using reduced seismic loads and current licensing basis allowables that reduces plant operation and maintenance (O&M) costs, shortens plant outages, and reduces personnel radiation exp...

1998-09-10T23:59:59.000Z

54

Do Temporary-Help Jobs Improve Labor Market Outcomes for Low-Skilled Workers? Evidence from "Work First"  

E-Print Network (OSTI)

Temporary-help jobs offer rapid entry into paid employment, but they are typically brief and it is unknown whether they foster longer term employment. We utilize the unique structure of Detroit's welfare-to- work program ...

Autor, David H.

55

Temporary Losses of Highway Capacity and Impacts on Performance: Phase 2  

SciTech Connect

Traffic congestion and its impacts significantly affect the nation's economic performance and the public's quality of life. In most urban areas, travel demand routinely exceeds highway capacity during peak periods. In addition, events such as crashes, vehicle breakdowns, work zones, adverse weather, railroad crossings, large trucks loading/unloading in urban areas, and other factors such as toll collection facilities and sub-optimal signal timing cause temporary capacity losses, often worsening the conditions on already congested highway networks. The impacts of these temporary capacity losses include delay, reduced mobility, and reduced reliability of the highway system. They can also cause drivers to re-route or reschedule trips. Such information is vital to formulating sound public policies for the highway infrastructure and its operation. In response to this need, Oak Ridge National Laboratory, sponsored by the Federal Highway Administration (FHWA), made an initial attempt to provide nationwide estimates of the capacity losses and delay caused by temporary capacity-reducing events (Chin et al. 2002). This study, called the Temporary Loss of Capacity (TLC) study, estimated capacity loss and delay on freeways and principal arterials resulting from fatal and non-fatal crashes, vehicle breakdowns, and adverse weather, including snow, ice, and fog. In addition, it estimated capacity loss and delay caused by sub-optimal signal timing at intersections on principal arterials. It also included rough estimates of capacity loss and delay on Interstates due to highway construction and maintenance work zones. Capacity loss and delay were estimated for calendar year 1999, except for work zone estimates, which were estimated for May 2001 to May 2002 due to data availability limitations. Prior to the first phase of this study, which was completed in May of 2002, no nationwide estimates of temporary losses of highway capacity by type of capacity-reducing event had been made. This report describes the second phase of the TLC study (TLC2). TLC2 improves upon the first study by expanding the scope to include delays from rain, toll collection facilities, railroad crossings, and commercial truck pickup and delivery (PUD) activities in urban areas. It includes estimates of work zone capacity loss and delay for all freeways and principal arterials, rather than for Interstates only. It also includes improved estimates of delays caused by fog, snow, and ice, which are based on data not available during the initial phase of the study. Finally, computational errors involving crash and breakdown delay in the original TLC report are corrected.

Chin, S.M.

2004-11-10T23:59:59.000Z

56

Temporary Bridging Agents for use in Drilling and Completion of Enhanced Geothermal Systems  

Science Conference Proceedings (OSTI)

CSI Technologies, in conjunction with Alta Rock Energy and the University of Utah have undergone a study investigating materials and mechanisms with potential for use in Enhanced Geothermal Systems wells as temporary diverters or lost circulation materials. Studies were also conducted with regards to particle size distribution and sealing effectiveness using a lab-scale slot testing apparatus to simulate fractures. From the slot testing a numerical correlation was developed to determine the optimal PSD for a given fracture size. Field trials conducted using materials from this study were also successful.

Watters, Larry; Watters, Jeff; Sutton, Joy; Combs, Kyle; Bour, Daniel; Petty, Susan; Rose, Peter; Mella, Michael

2011-12-21T23:59:59.000Z

57

A Formaldehyde Exposure Assessment Tool for Occupants of FEMA Temporary Housing Units  

SciTech Connect

The report outlines the methodology used to develop a web-based tool to assess the formaldehyde exposure of the occupants of Federal Emergency Management Administration (FEMA) temporary housing units (THUs) after Hurricanes Katrina and Rita in 2005. Linear regression models were built using available data to retrospectively estimate the indoor temperature and relative humidity, formaldehyde emission factors and concentration, and hence the formaldehyde exposures. The interactive web-tool allows the user to define the inputs to the model to evaluate formaldehyde exposures for different scenarios.

Parthasarathy, Srinandini; Spears, Michael; Maddalena, Randy L.; Russell, Marion L; Apte, Michael G.

2010-10-01T23:59:59.000Z

58

NBER WORKING PAPER SERIES THE TEMPORARY ASSISTANCE FOR NEEDY FAMILIES PROGRAM  

E-Print Network (OSTI)

JEL No. I3 The Temporary Assistance for Needy Families (TANF) program was created in 1996 from what was previously named the Aid to Families with Dependent Children (AFDC) program. The TANF program is intended to serve low-income families, primarily those with only a single parent present, as did the AFDC program. The TANF program is distinguished from AFDC by strong work requirements, time limits on receipt, options for the provision of noncash assistance, and by a block grant financing structure. This paper reviews the rules of the TANF program and the research that has been conducted on it and on the AFDC program.

Robert A. Moffitt; Robert A. Moffitt

2002-01-01T23:59:59.000Z

59

Polymers with increased order  

DOE Patents (OSTI)

The invention features polymers with increased order, and methods of making them featuring a dense gas.

Sawan, Samuel P. (Tyngsborough, MA); Talhi, Abdelhafid (Rochester, MI); Taylor, Craig M. (Jemez Springs, NM)

1998-08-25T23:59:59.000Z

60

EFFECT OF TEMPERATURE AND HUMIDITY ON FORMALDEHYDE EMISSIONS IN TEMPORARY HOUSING UNITS  

SciTech Connect

The effect of temperature and humidity on formaldehyde emissions from samples collected from temporary housing units (THUs) was studied. The THUs were supplied by the U.S Federal Emergency Management Administration (FEMA) to families that lost their homes in Louisiana and Mississippi during the Hurricane Katrina and Rita disasters. Based on a previous study 1, 2, four of the composite wood surface materials that dominated contributions to indoor formaldehyde were selected to analyze the effects of temperature and humidity on the emission factors. Humidity equilibration experiments were carried out on two of the samples to determine how long the samples take to equilibrate with the surrounding environmental conditions. Small chamber experiments were then conducted to measure emission factors for the four surface materials at various temperature and humidity conditions. The samples were analyzed for formaldehyde via high performance liquid chromatography. The experiments showed that increases in temperature or humidity contributed to an increase in emission factors. A linear regression model was built using natural log of percentage relative humidity (RH) and inverse of temperature (in K) as predictor variables, and natural log of emission factors as the target variable. The coefficients of both inverse temperature and log relative humidity with log emission factor were found to be statistically significant for all the samples at the 95percent confidence level. This study should assist to retrospectively estimate indoor formaldehyde exposures of occupants of temporary housing units (THUs).

Parthasarathy, Srinandini; Maddalena, Randy L.; Russell, Marion L.; Apte, Michael G.

2010-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Compliance Order on Consent  

NLE Websites -- All DOE Office Websites (Extended Search)

Laws » Laws » Compliance Order on Consent Compliance Order on Consent The Compliance Order on Consent provides the requirements for environmental cleanup of hazardous constituents for LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email What is the Compliance Order on Consent? The Compliance Order on Consent between the State of New Mexico Environment Department and the United States Department of Energy and Los Alamos National Laboratory provides for specified compliance requirements for all of the solid waste management units, areas of concern, canyons, and watershed aggregates included in the Order. Compliance Order on Consent documents LANL documents submitted under the Compliance Order on Consent are

62

First-order inflation  

SciTech Connect

In the original proposal, inflation occurred in the process of a strongly first-order phase transition. This model was soon demonstrated to be fatally flawed. Subsequent models for inflation involved phase transitions that were second-order, or perhaps weakly first-order; some even involved no phase transition at all. Recently the possibility of inflation during a strongly first-order phase transition has been revived. In this talk I will discuss some models for first-order inflation, and emphasize unique signatures that result in inflation is realized in a first-order transition. Before discussing first-order inflation, I will briefly review some of the history of inflation to demonstrate how first-order inflation differs from other models. 58 refs., 3 figs.

Kolb, E.W. (Fermi National Accelerator Lab., Batavia, IL (USA) Chicago Univ., IL (USA). Enrico Fermi Inst.)

1990-09-01T23:59:59.000Z

63

Problem 2-Lexicographic Order  

E-Print Network (OSTI)

Problem: For complex numbers z = a + bi ? C and w = c + di ? C define z ? w if either a ordering of C. (Question I) Prove that this turns C into and ordered set. (Question II) Is this an ordered field? (no) (Question III) Does it have the least-upper-bound property? (no) We will first review the definitions of order and ordered set from Rudin [R]. We will then show that under the lexicographic ordering C is an ordered set. Definition 1. Let S be a set. An order on S is a relation, denoted by ?, with the following two properties: (i) If x ? S and y ? S then one and only one of the statements is true. x ? y, x = y, y ? x (ii) If x, y, z ? S, if x ? y and y ? z, then x ? z.

Jacob Bower

2008-01-01T23:59:59.000Z

64

Temporary Losses of Highway Capacity and Impacts on Performance: Phase 2  

NLE Websites -- All DOE Office Websites (Extended Search)

09 09 Temporary Losses of Highway Capacity and Impacts on Performance: Phase 2 November 2004 Prepared by S. M. Chin O. Franzese D. L. Greene H. L. Hwang Oak Ridge National Laboratory Oak Ridge, Tennessee R. C. Gibson The University of Tennessee Knoxville, Tennessee DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge: Web site: http://www.osti.gov/bridge Reports produced before January 1, 1996, may be purchased by members of the public from the following source: National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-605-6000 (1-800-553-6847) TDD: 703-487-4639 Fax: 703-605-6900 E-mail: info@ntis.fedworld.gov

65

Radioactive air emissions notice of construction portable/temporary radioactive air emission units  

SciTech Connect

This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type 1), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type III). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUS. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site.

Hays, C.B.

1996-10-22T23:59:59.000Z

66

CRADA Order Revision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRADA Order Revision CRADA Order Revision Linda Field Patent Counsel Department of Energy Goal CRADA Order DOE O 483.1 CRADA Manual DOE M 483.1-1 CRADA Order DOE O XXXX.X Departmental Directive Program Types of Directives Policies Regulations Orders Notices Manuals Guides Technical Standards Departmental Directive Program Directives Life Cycle Development Coordination Implementation Review (Certification) Development Phase *Orders are uploaded to RevCom for review and comment by all affected parties *60 days to develop draft & submit to MA-90 *Solicits input from stakeholders ( incl. field, contractors, and/or program counsel) Coordination Phase *MA-90 parses directive & sets due dates for review & comment *HQ Directives Points of Contact (DPCs) *Have 45 days to submit official comments on behalf of their

67

Wellcome Collection's First Major Temporary Exhibition ...Leonardo da Vinci Drawings, Andy Warhol Prints, Live Heart Surgery, Sacred Heart  

E-Print Network (OSTI)

The Heart Wellcome Collection's First Major Temporary Exhibition ...Leonardo da Vinci Drawings, Andy Warhol Prints, Live Heart Surgery, Sacred Heart Imagery Never Before Seen In Europe, Egyptian Book of the Dead, Foundling Cards, Venous Anatomy Tables... - The Heart book announced; writers include Jonathan

Maizels, Rick

68

Executive Order 13329  

Science Conference Proceedings (OSTI)

... in this order shall be construed to impair or otherwise affect the authority of the Director of the Office of Management and Budget with respect to ...

2010-10-05T23:59:59.000Z

69

EXECUTIVE ORDER 13111  

NLE Websites -- All DOE Office Websites (Extended Search)

PM EXECUTIVE ORDER 13111 January 12, 1999 - - - - - - - USING TECHNOLOGY TO IMPROVE TRAINING OPPORTUNITIES FOR FEDERAL GOVERNMENT EMPLOYEES Advances in technology and increased...

70

Canonizable partial order generators  

Science Conference Proceedings (OSTI)

In a previous work we introduced slice graphs as a way to specify both infinite languages of directed acyclic graphs (DAGs) and infinite languages of partial orders. Therein we focused on the study of Hasse diagram generators, i.e., slice graphs that ... Keywords: automata, canonization, partial orders

Mateus de Oliveira Oliveira

2012-03-01T23:59:59.000Z

71

Second order ambient intelligence  

Science Conference Proceedings (OSTI)

This text attempts to describe an imagined future of ambient intelligence. It assumes that one day most of the current issues within ambient intelligence will be solved and that a second order ambient intelligence will be formulated, one with new research ... Keywords: Critique of ambient intelligence, adaptive systems, animal machine interaction, critical futurism, long-term behavior, second order ambient intelligence, temporal design

Marc Bhlen

2009-01-01T23:59:59.000Z

72

Transparent partial order reduction  

Science Conference Proceedings (OSTI)

Partial Order Reduction (POR) techniques improve the basic model checking algorithm by reducing the numbers of states and transitions explored in verifying a property of the model. In the "ample set" POR framework for the verification of an LTLX ... Keywords: Invisibility, Model checking, Partial order reduction, Transparent, Verification

Stephen F. Siegel

2012-02-01T23:59:59.000Z

73

Convexification of Stochastic Ordering  

E-Print Network (OSTI)

It dominates Y in the second order, but it does not belong to conv A(1)(Y) = A(1)(Y ). It follows from this example that the probability space must be sufficiently rich...

74

Forthcoming: American Economic Journal: Applied Economics Do Temporary-Help Jobs Improve Labor Market Outcomes for Low-Skilled Workers? Evidence from Work First  

E-Print Network (OSTI)

Temporary-help jobs offer rapid entry into paid employment, but they are typically brief and it is unknown whether they foster longer-term employment. We utilize the unique structure of Detroits welfare-to-work program to identify the effect of temporary-help jobs on labor market advancement. Exploiting the rotational assignment of welfare clients to numerous nonprofit contractors with differing job placement rates, we find that temporary-help job placements do not improve and may diminish subsequent earnings and employment outcomes among participants. In contrast, job placements with direct-hire employers substantially raise earnings and employment over a seven quarter follow-up period. JEL: J24, J48, J62 Keywords: Temporary-help, welfare to work, job placement, low-skill workers, causal effects. 1 Temporary-help firms employ a disproportionate share of low-skilled and minority U.S. workers (U.S. Department of Labor, Bureau of Labor Statistics 2005). Within the low-wage population, employment in temporary help is especially prevalent among participants in public employment and training programs. Although the temporary-help industry accounts for less than

David Autor; Susan N. Houseman

2008-01-01T23:59:59.000Z

75

Temporary camps at drill hole U19aq on Pahute Mesa, Nye County, Nevada  

SciTech Connect

The US Department of Energy, Nevada Field Office, has proposed a nuclear test at drill hole U19aq (902100N/585000E, Nevada Coordinate System, Central Zone) on Pahute Mesa, Nevada Test Site, Nevada. In compliance with Section 106 of the National Historic Preservation Act, the DOE/NV had the Quatenary Sciences Center, Desert Research Institute, identify and evaluate the potential effects of this activity on cultural resources. To determine the nature of cultural resources in the area, DRI conducted a Class III intensive archaeological survey of an approximately 1-km{sup 2} area around the drill hole. That survey, conducted in June 1985, located and recorded 20 archaeological sites. Two of those sites, interpreted as temporary camps of ancient hunters and gatherers, covered an extensive portion of the area proposed for nuclear testing. Half the sites were small concentrations of artifacts or isolated artifacts and were collected at the time of their discovery and 10 sites were left in place. Those sites were in danger of being adversely affected by the land-disturbing activities proposed at the drill hole. In August and September 1985, DRI conducted limited test excavations (15 test units) at those sites to further evaluate their scientific significance and to provide information that could be used in designing a plan for data recovery.

Pippin, L.C.; Reno, R.L.; Henton, G.H.; Hemphill, M.; Lockett, C.L.

1992-12-31T23:59:59.000Z

76

Temporary camps at drill hole U19aq on Pahute Mesa, Nye County, Nevada  

SciTech Connect

The US Department of Energy, Nevada Field Office, has proposed a nuclear test at drill hole U19aq (902100N/585000E, Nevada Coordinate System, Central Zone) on Pahute Mesa, Nevada Test Site, Nevada. In compliance with Section 106 of the National Historic Preservation Act, the DOE/NV had the Quatenary Sciences Center, Desert Research Institute, identify and evaluate the potential effects of this activity on cultural resources. To determine the nature of cultural resources in the area, DRI conducted a Class III intensive archaeological survey of an approximately 1-km[sup 2] area around the drill hole. That survey, conducted in June 1985, located and recorded 20 archaeological sites. Two of those sites, interpreted as temporary camps of ancient hunters and gatherers, covered an extensive portion of the area proposed for nuclear testing. Half the sites were small concentrations of artifacts or isolated artifacts and were collected at the time of their discovery and 10 sites were left in place. Those sites were in danger of being adversely affected by the land-disturbing activities proposed at the drill hole. In August and September 1985, DRI conducted limited test excavations (15 test units) at those sites to further evaluate their scientific significance and to provide information that could be used in designing a plan for data recovery.

Pippin, L.C.; Reno, R.L.; Henton, G.H.; Hemphill, M.; Lockett, C.L.

1992-01-01T23:59:59.000Z

77

EXECUTIVE ORDER 13514  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORDER 13514 ORDER 13514 FEDERAL LEADERSHIP IN ENVIRONMENTAL, ENERGY AND ECONOMIC PERFORMANCE FAR and DEAR Implementation and User Aids. 1 Notice a Pattern * Third President in a Row to do this! * Clinton had 5 Greening Orders starting with 13101. * Bush trumped him by putting it all in one, i.e., EO 13423, [Did you know? Congress made this permanent by placing it in a continuing resolution!]. * Obama trumped him by adding Green House Gases and Plug In Hybrids in EO 13514. 2 FAR Case 2010-001 Sustainable Acquisition - What's New * A new 23.002 is established aimed directly at DOE. It repeats E.O. 13423, Section 3(e) requirement that contracts for Contractor operation of a Government facility must contain a clause requiring the Contractor to comply with E.O. 13423 to

78

Measured leak rates of the temporary seals in DWPF canistered waste forms after three years of on site storage  

SciTech Connect

In the summer of 1990 a study was carried out to determine the-internal pressure, relative humidity, and chemical composition of the gas within the free volume of four canistered waste forms produced at TNX in May of 1988. Three of these canistered waste forms were sealed only by temporary seals and subsequently stored in the TNX boneyard' with no protection. The fourth canister was sealed by upset resistance welding. All three canisters with temporary seals were decontaminated by aqueous frit blasting. It was important to remeasure the leak rates of these seals to ensure that leaktightness had not deteriorated during canister handling and storage prior to the time the experiment were performed. This paper details the results of two separate measurements of the leak rates of these seals.

Harbour, J.R.; Miller, T.J.

1992-04-06T23:59:59.000Z

79

Measured leak rates of the temporary seals in DWPF canistered waste forms after three years of on site storage  

SciTech Connect

In the summer of 1990 a study was carried out to determine the-internal pressure, relative humidity, and chemical composition of the gas within the free volume of four canistered waste forms produced at TNX in May of 1988. Three of these canistered waste forms were sealed only by temporary seals and subsequently stored in the TNX `boneyard` with no protection. The fourth canister was sealed by upset resistance welding. All three canisters with temporary seals were decontaminated by aqueous frit blasting. It was important to remeasure the leak rates of these seals to ensure that leaktightness had not deteriorated during canister handling and storage prior to the time the experiment were performed. This paper details the results of two separate measurements of the leak rates of these seals.

Harbour, J.R.; Miller, T.J.

1992-04-06T23:59:59.000Z

80

Record of Decision for the Temporary Small Resource Policy, (DOE/EIS-0183)(6/22/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATOR'S RECORD OF DECISION ADMINISTRATOR'S RECORD OF DECISION Temporary Small Resource Policy INTRODUCTION The Bonneville Power Administration (BPA) is establishing a Temporary Small Resource Policy (Policy) as an incentive to utility customers to use small resources to serve a portion of their electricity needs, reducing firm load on BPA and to also use such resources to help alleviate the West Coast power emergency. The West Coast is in the midst of a power emergency caused by a demand for electricity that is often greater than its supply and record high wholesale market prices. This Policy is a one- time, short-term response to the West Coast power emergency and is one of many measures BPA is undertaking. BPA and the Pacific Northwest are facing severe conditions during the next 12 to 15 months:

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

LWX-0014 Supplemental Order  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Supplemental Order Name of Petitioner: Ronald A. Sorri Date of Filing: September 26, 1994 Case Number: LWX-0014 This Decision supplements an Initial Agency Decision, dated December 16, 1993, issued by the undersigned Hearing Officer of the Office of Hearings and Appeals (OHA) of the Department of Energy in a case involving a "whistleblower" complaint filed by Ronald A. Sorri (Sorri) under the Department of Energy's Contractor Employee Protection Program, 10 C.F.R. Part 708. See Ronald A. Sorri, 23 DOE & 87,503 (1993) (Sorri). In the December 16 Decision, I found that Sorri had proven by a preponderance of the evidence that he engaged in activities protected under Part 708 and that these activities were a contributing

82

Radioactive air emissions notice of construction portable temporary radioactive air emission units - August 1998  

SciTech Connect

This notice of construction (NOC) requests a categorical approval for construction and operation of three types of portable/temporary radionuclide airborne emission units (PTRAEUs). These three types are portable ventilation-filter systems (Type I), mobile sample preparation facilities (Type II), and mobile sample screening and analysis facilities (Type 111). Approval of the NOC application is intended to allow construction and operation of the three types of PTRAEUs without prior project-specific approval. Environmental cleanup efforts on the Hanford Site often require the use of PTRAEUs. The PTRAEUs support site characterization activities, expedited response actions (ERAs), sampling and monitoring activities, and other routine activities. The PTRAEUs operate at various locations around the Hanford Site. Radiation Air Emissions Program, Washington Administrative Code (WAC) 246-247, requires that the Washington State Department of Health (WDOH) be notified before construction of any new emission that would release airborne radioactivity. The WDOH also must receive notification before any modification of an existing source. This includes changes in the source term or replacement of emission control equipment that might significantly contribute to the offsite maximum dose from a licensed facility. During site characterization activities, ERAs, sampling and monitoring activities, and other routine activities, the PTRAEUs might require startup immediately. The notification period hampers efforts to complete such activities in an effective and timely manner. Additionally, notification is to be submitted to the WDOH when the PTRAEUs are turned off. The U.S. Department of Energy, Richland Operations Office (DOE-RL) potentially could generate several notifications monthly. The WDOH would be required to review and provide approval on each NOC as well as review the notices of discontinued sources. The WDOH regulation also allows facilities the opportunity to request a single categorical license that identifies limits and conditions of operations for similar multipurpose temporary and or portable emission units. The DOE-RL will submit annually to the WDOH a report summarizing the log books maintained on the individual PTRAEUs that are used during the reporting period. The report will supply information needed to ensure compliance with the condition of operations. The NOC includes a general description of the three types of PTRAEUs, tracking mechanisms, emissions control systems, and radioactivity handling limits (RHLs) for the PTR4EUs. The NOC is based on hypothetical data to demonstrate how emission estimates could be calculated. Tracking will be performed and monitoring will be conducted for compliance with both federal and state regulations. Type I units will use a single isotope based on a calculated RHL (source term) to determine emissions, dose, and monitoring requirements. Type I1 and 111 units will use field data and process knowledge to determine emissions, dose, and monitoring requirements. New PTRAEUs that conform to any of the three types of PTRAEUs described in this application will be added to the next annual report after the units are placed in service. New PTRAEUs, which do not conform to any of the three types of PTRAEUs described in this application, will require approval on an individual basis by the WDOH before startup.

FRITZ, D.W.

1999-07-22T23:59:59.000Z

83

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.  

DOE Green Energy (OSTI)

The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

Bellgraph, Brian J. [Pacific Northwest National Laboratory

2009-03-31T23:59:59.000Z

84

DECISION AND ORDER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2004 , 2004 DECISION AND ORDER OF THE DEPARTMENT OF ENERGY Decision of the Director Name of Petitioner: Charles L. Evans Date of Filing: May 17, 2004 Case Number: TBU-0026 Charles Evans, a former employee of Fluor Hanford Inc. (Fluor), a Department of Energy (DOE) contractor, appeals the DOE Richland Operations Office=s (Richland) dismissal of the whistleblower complaint he filed against Fluor under 10 C.F.R. Part 708, the DOE Contractor Employee Protection Program. I. BACKGROUND A. The DOE=s Contractor Employee Protection Program The DOE=s Contractor Employee Protection Program was established to safeguard Apublic and employee health and safety; ensur[e] compliance with applicable laws, rules, and regulations; and prevent[] fraud, mismanagement, waste and abuse@ at DOE=s government-owned, contractor-operated facilities. 57 Fed. Reg.

85

Field Derived Emission Factors For Formaldehyde and other Volatile Organic Compounds in FEMA Temporary Housing Units  

Science Conference Proceedings (OSTI)

Sixteen previously occupied temporary housing units (THUs) were studied to assess emissions of volatile organic compounds. The whole trailer emission factors wereevaluated for 36 VOCs including formaldehyde. Indoor sampling was carried out in the THUs located in Purvis staging yard in Mississippi, USA. Indoor temperature andrelative humidity (RH) were also measured in all the trailers during sampling. Indoor temperatures were varied (increased or decreased) in a selection of THUs using theheating, ventilation and air conditioning (HVAC) systems. Indoor temperatures during sampling ranged from 14o C to 33o C, and relative humidity (RH) varied between 35percentand 74percent. Ventilation rates were increased in some trailers using bathroom fans and vents during some of the sampling events. Ventilation rates measured during some aselection of sampling events varied from 0.14 to 4.3 h-1. Steady state indoor formaldehyde concentrations ranged from 10 mu g-m-3 to 1000 mu g-m-3. The formaldehyde concentrations in the trailers were of toxicological significance. The effects of temperature, humidity and ventilation rates were also studied. A linearregression model was built using log of percentage relative humidity, inverse of temperature (in K-1), and inverse log ACH as continuous independent variables, trailermanufacturer as a categorical independent variable, and log of the chemical emission factors as the dependent variable. The coefficients of inverse temperature, log relativehumidity, log inverse ACH with log emission factor were found to be statistically significant for all the samples at the 95percent confidence level. The regression model wasfound to explain about 84percent of the variation in the dependent variable. Most VOC concentrations measured indoors in the Purvis THUs were mostly found to be belowvalues reported in earlier studies by Maddalena et al.,1,2 Hodgson et al.,3 and Hippelein4. Emissions of TMPB-DIB (a plasticizer found in vinyl products) were found to be higher than values reported in comparable housing by Hodgson et al.,3. Emissions of phenol were also found to be slightly higher than values reported in earlier studies1,2,3. This study can assist in retrospective formaldehyde exposure assessments of THUs where estimates of the occupants indoor formaldehyde exposures are needed.

Parthasarathy, Srinandini; Maddalena, Randy L.; Russell, Marion L.; Apte, Michael G.

2010-10-01T23:59:59.000Z

86

Self-decomposable Fibrous Bridging Additives for Temporary Cementitious Fracture Sealers in EGS Wells  

SciTech Connect

This study evaluates compatibility of a self-degradable temporary fracture sealer with the drilling mud and plugging and self-degrading performance of different fibers to be used in combination with the sealer. The sodium silicate-activated slag/Class C fly ash (SSASC) cementitious sealer must plug fractures at 85oC to allow continuous well drilling and it must degrade and leave the fractures open for water at later times when exposed to temperatures above 200oC. The sealer showed good compatibility with the mud. Even the blend of 80/20 vol.% of sealer/mud reached a compressive strength of more than 2000 psi set as one of the material criteria, mostly due to the additional activation of the slag and Class C fly ash by the alkaline ingredient present in the drilling fluid. In contrast, the drilling fluid was detrimental to the compressive strength development in conventional Class G well cement, so that it failed to meet this criterion. Among several organic fibers tested both polyvinyl alcohol (PVA)-and nylon-based fibers showed adequate plugging of the sealer in slot nozzles of 1-in. wide x 6-in. long x 0.08 in. and 0.24 in. high under pressures up to 700 psi. PVA fibers displayed better compressive toughness and self-degrading properties than nylon. The compressive toughness of sealers made by adding 1.0 wt% 6 mm-length PVA and 0.5 wt% 19 mm-length PVA was 9.5-fold higher than that of a non-bridged sealer. One factor governing the development of such high toughness was an excellent adherence of PVA to the SSASC cement. The alkali-catalyzed self-decomposition of PVA at 200C led to the morphological transformation of the material from a fibrous structure to a microscale flake-like structure that helped the desirable conversion of the sealer into small fragments. In contrast, nylons decomposition provided a reticular network structure in the self-degraded sealer resulting in bigger fragments compared against the sealer with PVA. The PVA fiber has a high potential as a self-decomposable bridging additive in the SSASC cement sealer.

Sugama T.; Pyatina, T.; Gill, S.; Kisslinger, K.; Iverson, B.; Bour, D.

2012-11-01T23:59:59.000Z

87

Competition Advocates and Task-Order and Delivery Order Ombudsman...  

National Nuclear Security Administration (NNSA)

Delivery Order Ombudsman Home > About Us > Our Operations > Acquisition and Project Management > Office of Acquisition Management (OAM) > Competition Advocates and Task-Order and...

88

ALDEHYDE AND OTHER VOLATILE ORGANIC CHEMICAL EMISSIONS IN FOUR FEMA TEMPORARY HOUSING UNITS ? FINAL REPORT  

Science Conference Proceedings (OSTI)

Four unoccupied FEMA temporary housing units (THUs) were studied to assess their indoor emissions of volatile organic compounds including formaldehyde. Measurement of whole-THU VOC and aldehyde emission factors (mu g h-1 per m2 of floor area) for each of the four THUs were made at FEMA's Purvis MS staging yard using a mass balance approach. Measurements were made in the morning, and again in the afternoon in each THU. Steady-state indoor formaldehyde concentrations ranged from 378 mu g m-3 (0.31ppm) to 632 mu g m-3 (0.52 ppm) in the AM, and from 433 mu g m-3 (0.35 ppm) to 926 mu g m-3 (0.78 ppm) in the PM. THU air exchange rates ranged from 0.15 h-1 to 0.39 h-1. A total of 45 small (approximately 0.025 m2) samples of surface material, 16 types, were collected directly from the four THUs and shipped to Lawrence Berkeley Laboratory. The material samples were analyzed for VOC and aldehyde emissions in small stainless steel chambers using a standard, accurate mass balance method. Quantification of VOCs was done via gas chromatography -- mass spectrometry and low molecular weight aldehydes via high performance liquid chromatography. Material specific emission factors (mu g h-1 per m2 of material) were quantified. Approximately 80 unique VOCs were tentatively identified in the THU field samples, of which forty-five were quantified either because of their toxicological significance or because their concentrations were high. Whole-trailer and material specific emission factors were calculated for 33 compounds. The THU emission factors and those from their component materials were compared against those measured from other types of housing and the materials used in their construction. Whole THU emission factors for most VOCs were typically similar to those from comparative housing. The three exceptions were exceptionally large emissions of formaldehyde and TMPD-DIB (a common plasticizer in vinyl products), and somewhat elevated for phenol. Of these three compounds, formaldehyde was the only one with toxicological significance at the observed concentrations. Whole THU formaldehyde emissions ranged from 173 to 266 mu g m-2 h 1 in the morning and 257 to 347 mu g m-2 h-1 in the afternoon. Median formaldehyde emissions in previously studied site-built and manufactured homes were 31 and 45 mu g m-2 h-1, respectively. Only one of the composite wood materials that was tested appeared to exceed the HUD formaldehyde emission standard (430 mu g/m2 h-1 for particleboard and 130 mu g/m2 h-1 for plywood). The high loading factor (material surface area divided by THU volume) of composite wood products in the THUs and the low fresh air exchange relative to the material surface area may be responsible for the excessive concentrations observed for some of the VOCs and formaldehyde.

Salazar, Olivia; Maddalena, Randy L.; Russell, Marion; Sullivan, Douglas P.; Apte, Michael G.

2008-05-04T23:59:59.000Z

89

Executive Order 13423 Implementing Instructions  

Energy.gov (U.S. Department of Energy (DOE))

INSTRUCTIONS FOR IMPLEMENTING EXECUTIVE ORDER 13423Strengthening Federal Environmental, Energy, and Transportation Management

90

Public Order and Safety Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

Order and Safety Order and Safety Characteristics by Activity... Public Order and Safety Public order buildings are those used for the preservation of law and order or public safety. Basic Characteristics [ See also: Equipment | Activity Subcategories | Energy Use ] Public Order and Safety Buildings... Volunteer fire stations tend not to be government owned, which probably explains why 33 percent of public order and safety buildings were not owned by Federal, state, or local governments. Only 7 percent of all public order and safety buildings were constructed in the 1990's. The Northeast Census region had a high concentration of public order and safety buildings—43 percent of these buildings are in the Northeast (while the Northeast region contained only 9 percent of all commercial buildings).

91

Closure operators for order structures  

Science Conference Proceedings (OSTI)

We argue that closure operators are fundamental tools for the study of relationships between order structures and their sequence representations. We also propose and analyse a closure operator for interval order structures.

Ryszard Janicki; Dai Tri Man L; Nadezhda Zubkova

2009-09-01T23:59:59.000Z

92

A point of order 8  

E-Print Network (OSTI)

A formula expressing a point of order 8 on an elliptic curve, in terms of the roots of the associated cubic polynomial, is given. Doubling such a point yields a point of order 4 distinct from the well-known points of order 4 given in standard references such as "A course of Modern Analysis" by Whittaker and Watson.

Semjon Adlaj

2011-10-03T23:59:59.000Z

93

ORDER  

NLE Websites -- All DOE Office Websites (Extended Search)

6-2010 6-2010 PACKAGING AND TRANSPORTATION FOR OFFSITE SHIPMENT OF MATERIALS OF NATIONAL SECURITY INTEREST NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of Defense Programs DOE O 461.1B DOE O 461.1B 1 12-16-2010 PACKAGING AND TRANSPORTATION FOR OFFSITE SHIPMENT OF MATERIALS OF NATIONAL SECURITY INTEREST 1. PURPOSE. The Department of Energy (DOE) has broad authority under the Atomic Energy Act of 1954, as amended (AEA), to regulate all aspects of activities involving radioactive materials that are undertaken by DOE or on its behalf, including the transportation of radioactive materials. DOE exercises this authority to regulate certain DOE shipments, such as shipments of materials of national security interest undertaken by governmental employees or shipments involving special circumstances. The National

94

ORDER  

Office of Legacy Management (LM)

chairperson of the STAAB. g. Assistant Deputy Administrator for Science, Engineering and Production Programs. (1) Coordinates NNSA packaging needs for materials of national...

95

ORDER  

Office of Legacy Management (LM)

Sciences (BES); DOE Office of Energy Efficiency and Renewable Energy (EERE), Solar Energy Technologies Program; DOE Office of Environmental Management (EM), Office of Technology...

96

Ordering  

NLE Websites -- All DOE Office Websites (Extended Search)

spacer spacer spacer About DOE Organization News Contact Us Search Search Go spacer U.S. Department of Energy header image Science & Technology Energy Sources Energy Efficiency...

97

ORDER  

Office of Legacy Management (LM)

and necessary interactions between S&S programs and other disciplines such as safety, emergency management, classification, counterintelligence, facility operations, cyber system...

98

Endovascular Mechanical Recanalisation After Intravenous Thrombolysis in Acute Anterior Circulation Stroke: The Impact of a New Temporary Stent  

Science Conference Proceedings (OSTI)

Purpose: Treatment of acute stroke by endovascular mechanical recanalisation (EMR) has shown promising results and continues to be further refined. We evaluated the impact of a temporary stent compared with our results using other mechanical devices. Materials and Methods: We analysed clinical and radiological data of all patients who were treated by EMR after intravenous thrombolysis for acute carotid T- and middle-cerebral artery (M1) occlusions at our centre between 2007 and 2011. A comparison was performed between those patients in whom solely the stent-retriever was applied (group S) and those treated with other devices (group C). Results: We identified 14 patients for group S and 16 patients for group C. Mean age, National Institute of Health Stroke Scale score, and time to treatment were 67.1 years and 16.5 and 4.0 h for group S and 61.1 years and 17.6 and 4.5 h for group C, respectively. Successful recanalisation (thrombolysis in cerebral infarction scores {>=}IIb) was achieved in 93% of patients in group S and 56% of patients in group C (P < 0.05). Mean recanalisation times for M1 occlusions were 23 min (group S) and 29 min (group C) and for carotid-T occlusions were 39 min (group S) and 50 min (group C), and 45% of the patients in group S and 33% in group C had a favourable outcome (Modified Rankin Scale score {<=}2). Conclusion: The findings suggest an improvement in recanalisation success by the application of a temporary stent compared with previously used devices. These results are to be confirmed by larger studies.

Fesl, Gunther, E-mail: gunther.fesl@med.uni-muenchen.de; Patzig, Maximilian; Holtmannspoetter, Markus [University of Munich, Department of Neuroradiology (Germany); Mayer, Thomas E. [University of Jena, Department of Neuroradiology (Germany); Pfefferkorn, Thomas; Opherk, Christian [University of Munich, Department of Neurology (Germany); Brueckmann, Hartmut [University of Munich, Department of Neuroradiology (Germany); Wiesmann, Martin [University Hospital, Department of Diagnostic and Interventional Neuroradiology (Germany)

2012-12-15T23:59:59.000Z

99

Rates - WAPA-137 Rate Order  

NLE Websites -- All DOE Office Websites (Extended Search)

WAPA-137 Rate Order WAPA-137 Rate Order 2009 CRSP Management Center Customer Rates Second Step Presentation from the June 25, 2009, Customer Meeting Handout Materials from the June 25, 2009, Customer Meeting Customer Comment Letters ATEA CREDA Farmington ITCA AMPUA Rate Adjustment Information The second step of WAPA-137 SLCA/IP Firm Power, CRSP Transmission and Ancillary Services rate adjustment. FERC Approval of Rate Order No. WAPA-137 Notice Of Filing for Rate Order No. WAPA-137 Published Final FRN for Rate Order No. WAPA-137 Letter to Customers regarding the published Notice of Extension of Public Process for Rate Order No. WAPA-137 Published Extension of Public Process for Rate Order No. WAPA-137 FRN Follow-up Public Information and Comment Forum Flier WAPA-137 Customer Meetings and Rate Adjustment Schedule

100

Competition Advocates and Task-Order and Delivery Order Ombudsman |  

National Nuclear Security Administration (NNSA)

Competition Advocates and Task-Order and Delivery Order Ombudsman | Competition Advocates and Task-Order and Delivery Order Ombudsman | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Competition Advocates and Task-Order and Delivery Order Ombudsman Home > About Us > Our Operations > Acquisition and Project Management > Office of Acquisition Management (OAM) > Competition Advocates and

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Paperclips Etc. Special Order Form  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PSS-02.2 (March 7, 2011) Replaces PSS-02.1 PSS-02.2 (March 7, 2011) Replaces PSS-02.1 PAPERCLIPS Etc. SPECIAL Orders Form This form is used to order supplies that are not readily available in the DOE HQ self-service supply stores or for items that require approval by Office Management. All supplies ordered MUST be used for Official Government Business only. Requestor's Name: ___________________________________________________ Date: __________________ Phone Number: __________________ DOE ID Badge No.: ________________________________________ Catalog Name: ______________________________________________________ Org Code: ______________ Item Number Page # Item Description Quantity Store Use Only ALL printed names (legible), signatures and dates are required before your Special order is processed.

102

Relevant Executive Orders and Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

please click here. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance (2009) In October 2009, President Obama issued Executive...

103

DOE Order on Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this order is to ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers requirements and...

104

Office of Enforcement - Compliance Orders  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Preliminary Notice of Violation and Compliance Order isued to Fluor Daniel Hanford, Inc., relating to events at the Spent Nuclear Fuels Project, K-Basins and other...

105

Order acceptance using genetic algorithms  

Science Conference Proceedings (OSTI)

This paper uses a genetic algorithm to solve the order-acceptance problem with tardiness penalties. We compare the performance of a myopic heuristic and a genetic algorithm, both of which do job acceptance and sequencing, using an upper bound based on ... Keywords: Genetic algorithms, Order acceptance, Scheduling

Walter O. Rom; Susan A. Slotnick

2009-06-01T23:59:59.000Z

106

Semidefinite Relaxations of Ordering Problems  

E-Print Network (OSTI)

Jan 19, 2011 ... The quadratic ordering problem does not seem to have attracted ... 2 Linear Ordering as a Linear Program in 0-1 variables .... Instead of the Lovsz-Schrijver lifting procedure, ...... Review of Economics and Statistics, 18, 1936. ... IEEE Transactions on Systems, Man, and Cybernetics, 11(2):109125, 1981.

107

Evaluating ordering heuristics for dynamic partial-order reduction techniques  

Science Conference Proceedings (OSTI)

Actor programs consist of a number of concurrent objects called actors, which communicate by exchanging messages. Nondeterminism in actors results from the different possible orders in which available messages are processed. Systematic testing of actor ...

Steven Lauterburg; Rajesh K. Karmani; Darko Marinov; Gul Agha

2010-03-01T23:59:59.000Z

108

RPAM & Energy Order Requirements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

430.1C, Real Property Asset Management 430.1C, Real Property Asset Management and DOE O 430.2B, Departmental Energy, Renewable Energy and Transportation Management Requirements, Overlap & Differences Office of Engineering and Construction Management September 2009 2 10/27/2009 Energy Order & RPAM Order Requirements DOE O 430.1C - RPAM DOE O 430.2B ENERGY ORDER Energy Efficiency Water Consumption Utility Metering ESPCs & USPCs Personnel - Energy Training Environmental Management System (EMS) Real Property Performance Indicators Sustainable Buildings Facilities Information Management System (FIMS) Personnel - Certified Realty Specialists Ten Year Site Plans Sustainable & Integrated Design TEAM Executable Plans High Performance Building Plan OVERLAP Real Property

109

Exact test for Markov order  

E-Print Network (OSTI)

We describe an exact test of the null hypothesis that a Markov chain is nth order versus the alternate hypothesis that it is $(n+1)$-th order. The procedure does not rely on asymptotic properties, but instead builds up the test statistic distribution via surrogate data and is valid for any sample size. Surrogate data are generated using a novel algorithm that guarantees, per shot, a uniform sampling from the set of sequences that exactly match the nth order properties of the observed data.

Pethel, Shawn D

2013-01-01T23:59:59.000Z

110

Complex higher order derivative theories  

SciTech Connect

In this work is considered a complex scalar field theory with higher order derivative terms and interactions. A procedure is developed to quantize consistently this system avoiding the presence of negative norm states. In order to achieve this goal the original real scalar high order field theory is extended to a complex space attaching a complex total derivative to the theory. Next, by imposing reality conditions the complex theory is mapped to a pair of interacting real scalar field theories without the presence of higher derivative terms.

Margalli, Carlos A.; Vergara, J. David [Instituto de Ciencias Nucleares, Universidad Nacional Autonoma de Mexico, Apartado Postal 70-543, Mexico 04510 DF (Mexico)

2012-08-24T23:59:59.000Z

111

Keystone: Order (2013-CE-2601)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Keystone Technologies, LLC to pay a $8,000 civil penalty after finding Keystone had failed to certify that certain models of fluorescent lamp ballasts comply with the applicable energy conservation standards.

112

TCP: Order (2011-CE-3501)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Technical Consumer Products, Inc. to pay a $3,000 civil penalty after finding TCP had failed to certify that a certain model of medium base compact fluorescent lamp (CFL) complies with the applicable energy conservation standards.

113

Leotek: Order (2013-CE-4903)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Leotek Electronics USA Corp. to pay a $8,000 civil penalty after finding Leotek had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

114

Dialight: Order (2013-CE-4902)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Dialight Corporation to pay a $8,000 civil penalty after finding Dialight had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

115

Trastar: Order (2013-CE-49003)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Trastar Inc. to pay a $8,000 civil penalty after finding Trastar had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

116

DOE Order on Quality Assurance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INITIATED BY: INITIATED BY: www.directives.doe.gov Office of Health, Safety and Security U.S. Department of Energy ORDER Washington, D.C. Approved: 4-25-2011 SUBJECT: QUALITY ASSURANCE 1. PURPOSE. a. To ensure that Department of Energy (DOE), including National Nuclear Security Administration (NNSA), products and services meet or exceed customers' requirements and expectations. b. To achieve quality for all work based upon the following principles: (1) All work, as defined in this Order, is conducted through an integrated and effective management system; (2) Management support for planning, organization, resources, direction, and control is essential to quality assurance (QA); (3) Performance and quality improvement require thorough, rigorous

117

Short Order Macromedia Dreamweaver 3  

Science Conference Proceedings (OSTI)

From the Publisher:Short Order Dreamweaver 3 teaches you Dreamweaver in a step-by-step progression of the complete Web site creation process. Presented in a comprehensive yet streamlined format, examples based on real-life projects cover all phases of ...

Steven Moniz

2000-04-01T23:59:59.000Z

118

Watermark: Order (2011-SW-2908)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Watermark Designs, Ltd. to pay a $4,200 civil penalty after finding Watermark Designs, Ltd. had manufactured and distributed in commerce in the U.S. sixty-three units of basic model SH-FAL90, a noncompliant showerhead.

119

Hicon: Order (2013-SE-1426)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Ningbo Hicon International Industry Company, Ltd. to pay a $1,912,714 civil penalty after finding Hicon had manufactured and distributed in commerce in the U.S. 115,126 units of basic model BD-200, a noncompliant freezer.

120

Universal: Order (2013-SE-26004)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Universal Lighting Technologies, Inc. to pay a $7,264 civil penalty after finding Universal had manufactured and distributed in commerce in the U.S. 454 units of model B140R277HP, a noncompliant fluorescent lamp ballast.

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Weighted order statistic classifiers with large rank-order margin.  

Science Conference Proceedings (OSTI)

We describe how Stack Filters and Weighted Order Statistic function classes can be used for classification problems. This leads to a new design criteria for linear classifiers when inputs are binary-valued and weights are positive . We present a rank-based measure of margin that can be directly optimized as a standard linear program and investigate its effect on generalization error with experiment. Our approach can robustly combine large numbers of base hypothesis and easily implement known priors through regularization.

Porter, R. B. (Reid B.); Hush, D. R. (Donald R.); Theiler, J. P. (James P.); Gokhale, M. (Maya)

2003-01-01T23:59:59.000Z

122

Long-Term Results of Brachytherapy With Temporary Iodine-125 Seeds in Children With Low-Grade Gliomas  

SciTech Connect

Purpose: To retrospectively review the results of temporary I-125 brachytherapy in 94 children and adolescents with low-grade glioma. Methods and Materials: Treatment was performed in progressive tumors roughly spherical in shape with a diameter of up to 5 cm, including 79 astrocytomas, 5 oligodendrogliomas, 4 oligoastrocytomas, 1 ependymoma, and 5 other tumors. Location was suprasellar/chiasmal in 44, thalamic/basal ganglia in 18, hemispheric in 15, midbrain/pineal region in 13, and lower brainstem in 3. Initially, 8% of patients were free of symptoms, 47% were symptomatic but not disabled, and 30% were slightly, 6% moderately, and 3% severely disabled. Results: 5- and 10-year survival was 97% and 92%. The response to I-125 brachytherapy over the long term was estimated after a median observation period of 38.4 (range, 6.4-171.0) months. At that time, 4 patients were in complete, 27 in partial, and 18 in objective remission; 15 showed stable and 30 progressive tumors. Treatment results did not correlate with age, sex, histology, tumor size, location, or demarcation of the tumor. Secondary treatment became necessary in 36 patients, including 19 who underwent repeated I-125 brachytherapy. At final follow-up, the number of symptom-free patients had risen to 21%. Thirty-eight percent showed symptoms without functional impairment, 19% were slightly and 11% moderately disabled, and only 4% were severely disabled. Conclusions: Response rates similar to those of conventional radiotherapy or chemotherapy can be anticipated with I-125 brachytherapy in tumors of the appropriate size and shape. We believe it to be a useful contribution to the treatment of low-grade gliomas in children.

Korinthenberg, Rudolf, E-mail: rudolf.korinthenberg@uniklinik-freiburg.d [Division of Neuropaediatrics and Muscular Disorders, Department of Paediatrics and Adolescent Medicine, University Hospital, Albert-Ludwigs University, Freiburg im Breisgau (Germany); Neuburger, Daniela [Division of Neuropaediatrics and Muscular Disorders, Department of Paediatrics and Adolescent Medicine, University Hospital, Albert-Ludwigs University, Freiburg im Breisgau (Germany); Trippel, Michael; Ostertag, Christoph; Nikkhah, Guido [Department of Stereotactic Neurosurgery, Neurocentre, University Hospital, Albert-Ludwigs University, Freiburg im Breisgau (Germany)

2011-03-15T23:59:59.000Z

123

NETL: CD-ROM Ordering System  

NLE Websites -- All DOE Office Websites (Extended Search)

CD-DVD Ordering System Publications CD-DVD Ordering System Please complete the following information so the National Energy Technology Lab (NETL) can promptly process your order....

124

Electrolux: Order (2012-CE-1901)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrolux North America, Electrolux North America, Respondent Issued: July 27, 2012 ) ) ) ) ) ORDER Case Number: 2012-CE-1901 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Electrolux North America ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. § 429.12. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

125

Sunpentown: Order (2012-CE-1505)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BEFORETHE BEFORETHE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 In the Matter of: Sunpcntown International Inc. Respondent Issued: August 2, 2012 ) ) ) ) ) ) ORDER Case Number: 2012-CE-1505 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Sunpentown Intemational Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.P.R. § 429.12. 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and

126

Cooper: Order (2012-SE-4701)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Cooper Power Systems, LLC to abide by the Compromise Agreement, which waived the civil penalty after finding Cooper had inadvertently distributed in commerce in the U.S. three models (total of five units) of distribution transformers. Cooper agrees to abide by the terms of a Notice of Noncompliance Determination to be issued pursuant to 10 C.F.R. 429.114.

127

Recent advances in ordered intermetallics  

SciTech Connect

This paper briefly summarizes recent advances in intermetallic research and development. Ordered intermetallics based on aluminides and silicides possess attractive properties for structural applications at elevated temperatures in hostile environments; however, brittle fracture and poor fracture resistance limit their use as engineering materials in many cases. In recent years, considerable efforts have been devoted to the study of the brittle fracture behavior of intermetallic alloys; as a result, both intrinsic and extrinsic factors governing brittle fracture have been identified. Recent advances in first-principles calculations and atomistic simulations further help us in understanding atomic bonding, dislocation configuration, and alloying effects in intermetallics. The basic understanding has led to the development of nickel, iron, and titanium aluminide alloys with improved mechanical and metallurgical properties for structural use. Industrial interest in ductile intermetallic alloys is high, and several examples of industrial involvement are mentioned.

Liu, C.T.

1992-12-31T23:59:59.000Z

128

Algorithms for discovering bucket orders from data  

Science Conference Proceedings (OSTI)

Ordering and ranking items of different types are important tasks in various applications, such as query processing and scientific data mining. A total order for the items can be misleading, since there are groups of items that have practically equal ... Keywords: bucket order, ordering, partial order, ranking

Aristides Gionis; Heikki Mannila; Kai Puolamki; Antti Ukkonen

2006-08-01T23:59:59.000Z

129

On transfinite Knuth-Bendix orders  

Science Conference Proceedings (OSTI)

In this paper we discuss the recently introduced transfinite Knuth-Bendix orders. We prove that any such order with finite subterm coefficients and for a finite signature is equivalent to an order using ordinals below ??, that is, ...

Laura Kovcs; Georg Moser; Andrei Voronkov

2011-07-01T23:59:59.000Z

130

Best management practices plan for installation of and monitoring at temporary Weirs at NT-4, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The purpose of the installation of temporary weirs at NT-4 is to collect empirical surface water discharge data for the tributary during baseflow conditions and following rainfall events, during the spring and summer of 1997 in support of the Department of Energy`s (DOE`s) Oak Ridge Reservation Waste Management Alternatives Evaluation project. The duration of surface-water monitoring activities is not planned to exceed 6 months. A minimum of four temporary weirs will be installed along the length of NT-4 in the locations indicated on Attachment A. The design specifications and locations for the weirs will be provided by the DOE prime contractor for the Oak Ridge Reservation Waste Management Alternatives Evaluation project. The weirs will be fabricated by the Y-12 labor forces of Lockheed Martin Energy Systems (LMES). The Environmental Compliance Organization (ECO) of LMES will perform data collection in addition to weir installation, inspection, maintenance, and removal. Flow meters that collect data at five minute intervals will be installed on each weir and visual measurements using staff gauges mounted on each weir will also be performed.

1997-06-01T23:59:59.000Z

131

President Truman Orders Development of Thermonuclear Weapon ...  

National Nuclear Security Administration (NNSA)

Weapon President Truman Orders Development of Thermonuclear Weapon January 31, 1950 Washington, DC President Truman Orders Development of Thermonuclear Weapon President...

132

Federal Energy Management Program: Executive Order 13514  

NLE Websites -- All DOE Office Websites (Extended Search)

514 to someone by E-mail Share Federal Energy Management Program: Executive Order 13514 on Facebook Tweet about Federal Energy Management Program: Executive Order 13514 on Twitter...

133

Federal Energy Management Program: Executive Order 13221  

NLE Websites -- All DOE Office Websites (Extended Search)

Fleet Reporting Executive Order 13221 Executive Order (E.O.) 13221, Energy Efficient Standby Power Devices, calls for Federal agencies to purchase products that use minimal...

134

Glimpse of heavy electrons reveals "hidden order"  

NLE Websites -- All DOE Office Websites (Extended Search)

Glimpse of heavy electrons reveals "hidden order" Glimpse of heavy electrons reveals "hidden order" The remarkable breakthrough helps validate theory behind the observed increase...

135

Federal Energy Management Program: Executive Order 13423  

NLE Websites -- All DOE Office Websites (Extended Search)

Executive Order Executive Order 13423 to someone by E-mail Share Federal Energy Management Program: Executive Order 13423 on Facebook Tweet about Federal Energy Management Program: Executive Order 13423 on Twitter Bookmark Federal Energy Management Program: Executive Order 13423 on Google Bookmark Federal Energy Management Program: Executive Order 13423 on Delicious Rank Federal Energy Management Program: Executive Order 13423 on Digg Find More places to share Federal Energy Management Program: Executive Order 13423 on AddThis.com... Requirements by Subject Requirements by Regulation National Energy Conservation Policy Act Executive Order 13514 Energy Independence & Security Act Executive Order 13423 Energy Policy Act of 2005 Executive Order 13221 Energy Policy Act of 1992 Notices & Rules

136

LLNS Beryllium Consent Order Fact Sheet  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- LLNS Beryllium Consent Order - LLNS Beryllium Consent Order SUMMARY OF CONSENT ORDER In November 2010, the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) issued a consent order to Lawrence Livermore National Security, LLC (LLNS) for deficiencies related to LLNS's implementation of DOE's Chronic Beryllium Disease Prevention Program (CBDPP) regulation at Lawrence Livermore National Laboratory. The consent order requires LLNS to implement corrective actions that will ensure LLNS meets DOE requirements for assessing and controlling beryllium hazards and minimizes potential worker exposures to legacy beryllium hazards in Laboratory buildings. Under the terms of the consent order, LLNS agrees to implement corrective actions that address the

137

Generalized structure of higher order nonclassicality  

E-Print Network (OSTI)

A generalized notion of higher order nonclassicality (in terms of higher order moments) is introduced. Under this generalized framework of higher order nonclassicality, conditions of higher order squeezing and higher order subpoissonian photon statistics are derived. A simpler form of the Hong-Mandel higher order squeezing criterion is derived under this framework by using an operator ordering theorem introduced by us in [J. Phys. A. 33 (2000) 5607]. It is also generalized for multi-photon Bose operators of Brandt and Greenberg. Similarly, condition for higher order subpoissonian photon statistics is derived by normal ordering of higher powers of number operator. Further, with the help of simple density matrices, it is shown that the higher order antibunching (HOA) and higher order subpoissonian photon statistics (HOSPS) are not the manifestation of the same phenomenon and consequently it is incorrect to use the condition of HOA as a test of HOSPS. It is also shown that the HOA and HOSPS may exist even in absence of the corresponding lower order phenomenon. Binomial state, nonlinear first order excited squeezed state (NLESS) and nonlinear vacuum squeezed state (NLVSS) are used as examples of quantum state and it is shown that these states may show higher order nonclssical characteristics. It is observed that the Binomial state which is always antibunched, is not always higher order squeezed and NLVSS which shows higher order squeezing does not show HOSPS and HOA. The opposite is observed in NLESS and consequently it is established that the HOSPS and HOS are two independent signatures of higher order nonclassicality

Amit Verma; Anirban Pathak

2009-01-21T23:59:59.000Z

138

GreenOrder | Open Energy Information  

Open Energy Info (EERE)

Place New York, New York Zip 10016 Product Founded in 2000, GreenOrder is a sustainability strategy and marketing firm References GreenOrder1 LinkedIn Connections...

139

Evaluating Heuristic Optimization Phase Order Search Algorithms  

Science Conference Proceedings (OSTI)

Program-specific or function-specific optimization phase sequences are universally accepted to achieve better overall performance than any fixed optimization phase ordering. A number of heuristic phase order space search algorithms have been devised ...

Prasad A. Kulkarni; David B. Whalley; Gary S. Tyson

2007-03-01T23:59:59.000Z

140

Higher Order Temporal Correlation Measured Using Up ...  

Science Conference Proceedings (OSTI)

... NIST. The results were published in Optics Express and include an animation showing the fourth order coloration. Lijun ...

2012-08-20T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Executive Order 13423- Strengthening Federal Environmental, Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

423- Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It...

142

Higher order invariants, cohomology, and automorphic forms  

E-Print Network (OSTI)

A general structure theorem on higher order invariants is proven. For an arithmetic group, the structure of the corresponding Hecke module is determined. It is shown that the module does not contain any irreducible submodule. This explains the fact that L-functions of higher order forms have no Euler-product. Higher order cohomology is introduced, classical results of Borel are generalized and a higher order version of Borel's conjecture is stated.

Deitmar, Anton

2008-01-01T23:59:59.000Z

143

Additive decomposition of fuzzy pre-orders  

Science Conference Proceedings (OSTI)

Fuzzy pre-orders (reflexive and min-transitive fuzzy relations) constitute an important class of fuzzy relations. By means of an indifference generator, a fuzzy pre-order can be decomposed additively into two parts: an indifference relation and a strict ... Keywords: Transitivity, Frank t-norm, Fuzzy pre-order, Indifference generator, Indifference relation, Nilpotent minimum, Strict preference relation

Susana Daz; Bernard De Baets; Susana Montes

2007-04-01T23:59:59.000Z

144

Higher-order symbolic execution via contracts  

Science Conference Proceedings (OSTI)

We present a new approach to automated reasoning about higher-order programs by extending symbolic execution to use behavioral contracts as symbolic values, thus enabling symbolic approximation of higher-order behavior. Our approach is based on the idea ... Keywords: higher-order contracts, reduction semantics, symbolic execution

Sam Tobin-Hochstadt; David Van Horn

2012-11-01T23:59:59.000Z

145

Order and Resolution for Computational Ocean Dynamics  

Science Conference Proceedings (OSTI)

An ocean flow that has all its scales resolved on a model grid can be more efficiently calculated to within a required accuracy by using high-order numerics than by grid refinement with low-order numerics. The differencing order must be at least ...

Brian G. Sanderson

1998-06-01T23:59:59.000Z

146

Infinite order decompositions of C$^*$-algebras  

E-Print Network (OSTI)

In the given article infinite order decompositions of C*-algebras are investigated. It is proved that for the infinite order decomposition of a C*-algebra A with respect to an infinite orthogonal set of projections of A, if the diagonal components of the infinite order decomposition are von Neumann algebras then the infinite order decomposition is a von Neumann algebra. Also, it is proved that, if a C*-algebra A with an infinite orthogonal set of projections such, that the least upper bound of this set is 1, is not a von Nemann algebra, projections of the set are pearwise equivalent then A does not coincide with its infinite order decomposition, and, if the infinite order decomposition is not weakly closed then this infinite order decomposition is not a C*-algebra.

Arzikulov, F N

2011-01-01T23:59:59.000Z

147

Patent-Infringement Injunctions' Scope  

E-Print Network (OSTI)

of an injunction or restraining order does not deprive it ofof an injunction or restraining order does not deprive it ofmanufacture. But the order does nothing directly to help

Golden, John

2011-01-01T23:59:59.000Z

148

C:\Documents and Settings\tayloroa\Local Settings\Temporary Internet Files\OLK9\ea-274.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wisconsin Public Service Corporation Wisconsin Public Service Corporation Order No. EA-274 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On November 28, 2002, Wisconsin Public Service Corporation (WPSC) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. WPSC is an investor-owned electric utility engaged in the generation, distribution and sale of electric energy. WPSC proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export this energy on its own behalf to Canada. The energy to be

149

An overview of task order 10  

DOE Green Energy (OSTI)

Task Order 10 formalizes a collaboration in high explosive pulsed power (HEPP) experiments between LANL and VNIIEF. The focus is the VNIIEF disk explosive magnetic generator (DEMG) technology. The task order outlines a sequence of tasks and deliverables culminating in an experiment which takes place in the US utilizing US explosives and a Russian DEMG. This talk summarizes task order 10. It gives a brief history and present status in terms of the proposed high pressure EOS experiment (ALT-3).

Rousculp, Christopher L [Los Alamos National Laboratory

2011-01-12T23:59:59.000Z

150

Order-of-Magnitude Influence Diagrams  

E-Print Network (OSTI)

In this paper, we develop a qualitative theory of influence diagrams that can be used to model and solve sequential decision making tasks when only qualitative (or imprecise) information is available. Our approach is based on an order-of-magnitude approximation of both probabilities and utilities and allows for specifying partially ordered preferences via sets of utility values. We also propose a dedicated variable elimination algorithm that can be applied for solving order-of-magnitude influence diagrams.

Marinescu, Radu

2012-01-01T23:59:59.000Z

151

Engineered Solutions: Order (2010-CE-2112)  

Energy.gov (U.S. Department of Energy (DOE))

DOE issued an Order after entering into a Compromise Agreement with Engineered Solutions, Inc. to resolve a case involving the failure to certify dehumidifier basic model SD109.

152

Hierarchically Ordered Porous Carbon Films for Commercial ...  

for kinetic adsorption. The ORNL invention offers both a method for making new, hierarchically ordered porous carbon films and describes a capacitive deionization

153

Executive Order 13514: Implementation Status Update  

NLE Websites -- All DOE Office Websites (Extended Search)

Larry Stirling Office of Environmental Policy & Assistance (HS-22) Environmental Sustainability Network February 18, 2010 Executive Order 13514 (October 5, 2009) "To establish an...

154

Federal Energy Management Program: Executive Order 13221  

NLE Websites -- All DOE Office Websites (Extended Search)

221 Executive Order (E.O.) 13221, Energy Efficient Standby Power Devices, calls for Federal agencies to purchase products that use minimal standby power when possible. It was...

155

High order Parzen windows and randomized sampling.  

E-Print Network (OSTI)

???In the thesis, high order Parzen windows are studied for understanding some algorithms in learning theory and randomized sampling in multivariate approximation. Our ideas are (more)

Zhou, Xiangjun (???)

2009-01-01T23:59:59.000Z

156

?1 Minimization via Randomized First Order Algorithms  

E-Print Network (OSTI)

In this paper we propose randomized first-order algorithms for solving bilinear ...... does not require knowledge of ?) is not worse that the theoretically optimal...

157

QUADRATIC ORDER CONDITIONS FOR BANG-SINGULAR ...  

E-Print Network (OSTI)

First, we obtain second order necessary optimality conditions. Secondly, we get a ... enters linearly, is that the corresponding second variation does not contain.

158

Partial Word Order Freezing in Dutch  

Science Conference Proceedings (OSTI)

Dutch allows for variation as to whether the first position in the sentence is occupied by the subject or by some other constituent, such as the direct object. In particular situations, however, this commonly observed variation in word order is `frozen' ... Keywords: Bidirectional Optimality Theory, Corpus study, Definiteness, Variation, Word order freezing

Gerlof J. Bouma; Petra Hendriks

2012-01-01T23:59:59.000Z

159

Exhaustive Optimization Phase Order Space Exploration  

Science Conference Proceedings (OSTI)

The phase-ordering problem is a long standing issue for compiler writers. Most optimizing compilers typically have numerous different code-improving phases, many of which can be applied in any order. These phases interact by enabling or disabling opportunities ...

Prasad A. Kulkarni; David B. Whalley; Gary S. Tyson; Jack W. Davidson

2006-03-01T23:59:59.000Z

160

Texas Union Pizza Order Form ROOM RESERVED ______________________________________________________  

E-Print Network (OSTI)

#12;#12;Texas Union Pizza Order Form ROOM RESERVED: ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ Pick-up All orders are to be picked up at the Texas Union Hospitality Center desk in the south end West with the Texas Union Policies and Procedures. I understand that I will be held responsible for any debts incurred

Texas at Austin, University of

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Complete Orders, Categories and Lattices of Approximations  

Science Conference Proceedings (OSTI)

The present article deals with the problem whether and how the bilattice orderings of knowledge ⩽$_k$ and truth ⩽$_t$ might enrich the theory of rough sets. Passing to the chief idea of the paper, we develop a bilattice-theoretic generalisation ... Keywords: *-autonomous category, Chu construction, Nelson lattice, approximation, bilattice, complete partial order, rough set

Marcin Wolski

2006-09-01T23:59:59.000Z

162

Complexity of the higher order matching  

Science Conference Proceedings (OSTI)

We use the standard encoding of Boolean values in simply typed lambda calculus to develop a method of translating SAT problems for various logics into higher order matching. We obtain this way already known NP-hardness bounds for the order two and three ...

Tomasz Wierzbicki

1999-07-01T23:59:59.000Z

163

Public Order and Safety | Open Energy Information  

Open Energy Info (EERE)

Order and Safety Order and Safety Jump to: navigation, search Building Type Public Order and Safety Definition Buildings used for the preservation of law and order or public safety. Sub Categories police station; fire station; jail, reformatory, or penitentiary; courthouse or probation office References EIA CBECS Building Types [1] References ↑ EIA CBECS Building Types U.S. Energy Information Administration (Oct 2008) Retrieved from "http://en.openei.org/w/index.php?title=Public_Order_and_Safety&oldid=270119" Category: CBECS Building Types What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863505291 Varnish cache server

164

Nanoscale Ordered MAterials Diffractometer Workshop (NOMAD 2011)  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanoscale Ordered MAterials Diffractometer Workshop Nanoscale Ordered MAterials Diffractometer Workshop NOMAD 2011 September 12 - 13, 2011 High-Flux Isotope Reactor * Spallation Neutron Source * Oak Ridge National Laboratory About the Workshop Contact Information Important Dates Application Form Sample Description NOMAD at SNS filler About the Workshop The acronym NOMAD stands for Nanoscale Ordered MAterials Diffractometer. It is a diffractometer located at the Spallation Neutron Source and is designed for the determination of pair distribution functions from a wide range of materials spanning from dense gases to long range ordered crystalline materials. It combines a large accessible Q range, large detector coverage with high intensity while maintaining good resolution. For a typical sample of the order of ~0.5cm3 good statistical accuracy can be achieved in minutes or even seconds of data acquisition time.

165

Order of Magnitude Reasoning using Logarithms  

E-Print Network (OSTI)

Converting complex equations into simpler, more tractable equations usually involves approximation. Approximation is usually done by identifying and removing insignificant terms, while retaining significant ones. The significance of a term can be determined by order of magnitude reasoning. In this paper we describe NAPIER, an implemented order of magnitude reasoning system. NAPIER defines the order of magnitude of a quantity on a logarithmic scale, and uses a set of rules to propagate orders of magnitudes through equations. A novel feature of NAPIER is the way it handles non-linear simultaneous equations, using linear programming in conjunction with backtracking. We show that order of magnitude reasoning in NAPIER is, in general, intractable and then discuss an approximate reasoning technique that allow it to run fast in practice. Some of NAPIER's inference rules are heuristic, and we estimate the error introduced by their use. 1 INTRODUCTION Mathematical models ...

P. Pandurang Nayak

1992-01-01T23:59:59.000Z

166

1993 triggered lighnting test program: Environments within 20 meters of the lighting channel and small area temporary protection concepts  

SciTech Connect

Vertical electric fields, azimuthal magnetic fields, and earth step potentials at ground level have been measured at 10 and 20 meters from the base of triggered lightning flashes. For incident stroke peak currents in the range of 4.4 to 29 kA, vertical electric field change amplitudes as high as 210 kV/m were observed at 10 m, with rise times of the order of a few microseconds. Magnetic fields were found to follow Ampere`s law closely at both 10 and 20 m. Earth step potentials measured over a 0.5-m radial distance at the 10-m and 20m stations were linear with and had the same waveforms as the stroke currents. The step voltages exhibited a l/r distance dependence between the two measurement distances. A model that incorporates the presence of a thin surface layer, due to rain water saturation, of much higher conductivity than the bulk of the underlying earth is proposed to explain the observed behavior. Tests were also carried out to evaluate the effectiveness of several concepts for protecting a small exposed object, such as a piece of ordnance at the site of a transportation accident, from either a direct strike or from the indirect effects of electromagnetic fields produced by a nearby lightning flash to ground. Photographs of the occurrence of significant radial filamentary arcing along the surface of the ground from the strike points were acquired. This type of arcing, with a maximum radial extent of at least 20 m, was observed on six of seven of triggered flashes and on all strokes of 15-kA peak amplitude or higher.

Fisher, R.J.; Schnetzer, G.H.

1994-03-01T23:59:59.000Z

167

Implementing for Implementing Executive Order 13423  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IMPLEMENTING EXECUTIVE IMPLEMENTING EXECUTIVE ORDER 13423 "Strengthening Federal Environmental, Energy, and Transportation Management" March 29, 2007 0 Contents I. Introduction ......................................................................................................................1 A. Purpose..................................................................................................................1 B. Authority ...............................................................................................................1 C. Organization and Oversight ..................................................................................1 D. Overarching Policy and Directives .......................................................................4

168

HSI Tape Ordering Script at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Tape Ordering Script Tape Ordering Script HSI Tape Ordering Script Below is an example of a perl script that shows how one might create a list of hsi retrievals from HPSS that are ordered by tape and tape position for the most efficient way to get the files. Note that the source directory in HPSS and the destination directory on disk are hardwired along with a selection on what files to list. The script is based on using "hsi ls" with the "-P" option. Also shown is what the script prints out as it is run and a snippet of the output file it produces containing the transfer commands. #! /usr/bin/perl use strict; ### This script lists an hpss directory, sorts the files according to ### tape and position on the tape and creates a file containing ### the transfer commands. Written by ELH, 10/29/10.

169

Order and chaos : articulating support, housing transformation  

E-Print Network (OSTI)

This thesis presents an exploration on the theme of order and chaos, as a formal and social phenomenon, particularly as it relates to housing. The work stems from an attraction to the messy vitality we find in certain ...

Boehm, William Hollister

1990-01-01T23:59:59.000Z

170

Ordering the attributes of query results  

Science Conference Proceedings (OSTI)

There has been a great deal of interest in the past few years on ranking of results of queries on structured databases, including work on probabilistic information retrieval, rank aggregation, and algorithms for merging of ordered lists. In many applications, ...

Gautam Das; Vagelis Hristidis; Nishant Kapoor; S. Sudarshan

2006-06-01T23:59:59.000Z

171

Administrative Order, June 13, 2000 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Order No. 00NWPKW-1251 Administrative Order No. 00NWPKW-1251 State Washington Agreement Type Administrative Order Legal Driver(s) RCRA Scope Summary Resolve Ecology's October 12, 1999 finding that DOE failed to complete Major TPA Milestone M-32 with respect to Double-Shell Tank (DST) integrity assessments Parties DOE; CH2M Hill Hanford Group; State of Washington Department of Ecology Date 6/13/2000 SCOPE * Require DOE and CH2M Hill Hanford Group to comply with the Revised Code of Washington, HWMA, Washington Administrative Code, the Dangerous Waste Regulations, and by reference, the CFR by taking actions which are described in this Order. * Resolve Ecology's October 12, 1999 finding that DOE failed to complete Major TPA Milestone M-32 with respect to Double-Shell Tank (DST) integrity assessments.

172

International Refrigeration: Order (2012-CE-1510)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered International Refrigeration Products to pay an $8,000 civil penalty after finding International Refrigeration had failed to certify that certain room air conditioners comply with the applicable energy conservation standard.

173

Cospolich Refrigerator: Order (2013-CE-5314)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Cospolich Refrigerator Co, Inc. to pay a $8,000 civil penalty after finding Cospolich Refrigerator had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

174

Fagor America: Order (2013-CEW-19001)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Fagor America, Inc. to pay a $13,000 civil penalty after finding Fagor America had failed to certify that certain models of residential refrigerator-freezers and dishwashers comply with the applicable energy and water conservation standards.

175

Custom Coolers: Order (2013-CE-5315)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Custom Coolers, LLC to pay a $8,000 civil penalty after finding Custom Coolers had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

176

Midea Washing Appliance: Order (2011-CE-1903)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Midea Washing Appliance Mfg. Co., Ltd. to pay a $6,000 civil penalty after finding Midea Washing Appliance had failed to certify that certain models of dishwashers comply with the applicable energy conservation standards.

177

Imperial Manufacturing: Order (2013-CE-5322)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Imperial Manufacturing, Inc. to pay a $8,000 civil penalty after finding Imperial Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

178

Kold Pack: Order (2013-CE-5323)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Kold Pack, Inc. to pay a $8,000 civil penalty after finding Kold Pack had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

179

ET Industries: Order (2012-SE-2902)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered ET Industries, Inc. to pay a $39,000 civil penalty after finding ET Industries had manufactured and distributed in commerce in the U.S. 974 units of basic model TH-1, a noncompliant showerhead.

180

Barclay Products: Order (2013-CW-3005)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Barclay Products, Ltd. to pay a $8,000 civil penalty after finding Barclay Products had failed to certify that certain models of water closets comply with the applicable water conservation standards.

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Energy and Hamiltonian in first order gravity  

E-Print Network (OSTI)

In this work the definition of a quasilocal energy for four dimensional first order gravity is developed. Using this an action principle which is adequate for the canonical ensemble is obtained. The microcanonical action principle is obtained as well.

Rodrigo Aros

2005-04-29T23:59:59.000Z

182

Limit order markets, liquidity, and price impact  

E-Print Network (OSTI)

In this thesis, I explore various aspects of market liquidity and analyze its effect on asset prices. First, in a model of a limit order market I explain how to define liquidity and derive a price impact function. Second, ...

Rosu, Ioanid, 1970-

2004-01-01T23:59:59.000Z

183

Act One: Order (2013-CE-49001)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Act One Communications, Inc. to pay a $8,000 civil penalty after finding Act One had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

184

Modelling higher-order dual nondeterminacy  

Science Conference Proceedings (OSTI)

We investigate models for programming and specifying in which higher-order functions and nondeterminacy (both demonic and angelic) coexist. The models are built using predicate transformers, binary multirelations, state transformers, and free lattices ...

Joseph M. Morris; Malcolm Tyrrell

2008-07-01T23:59:59.000Z

185

Refinement of higher-order logic programs  

Science Conference Proceedings (OSTI)

A refinement calculus provides a method for transforming specifications to executable code, maintaining the correctness of the code with respect to its specification. In this paper we extend the refinement calculus for logic programs to include higher-order ...

Robert Colvin; Ian Hayes; David Hemer; Paul Strooper

2002-09-01T23:59:59.000Z

186

Hisense USA: Order (2010-CE-1211)  

Energy.gov (U.S. Department of Energy (DOE))

DOE issued an Order after entering into a Compromise Agreement with Hisense USA Corp. after finding Hisense USA had failed to certify that certain models of residential refrigerators, refrigerator-freezers, and freezers comply with the applicable energy conservation standards.

187

Acme Kitchenettes: Order (2011-CE-1406)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Acme Kitchenettes Corp. to pay a $6,000 civil penalty after finding Acme Kitchenettes had failed to certify that certain models of refrigerators comply with the applicable energy conservation standards.

188

Polar King: Order (2013-CE-5328)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Polar King International Inc. to pay a $8,000 civil penalty after finding Polar King had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

189

Office of Security Policy - Regulations and Orders  

NLE Websites -- All DOE Office Websites (Extended Search)

Part 970--DOE Management and Operating Contracts, 970.5204-2 Laws, Regulations, and DOE Directives DOE DIRECTIVES: DOE Order 142.3, Chg.1, Unclassified Foreign Visits and...

190

Living Direct: Order (2011-CE-1904)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Living Direct, Inc. to pay a $6,000 civil penalty after finding Living Direct had failed to certify that certain models of dishwashers, refrigerator-freezers and freezers comply with the applicable energy conservation standards.

191

Supporting order picking with Augmented Reality  

Science Conference Proceedings (OSTI)

We report on recent progress in the iterative process of exploring, evaluating and refining Augmented Reality-based methods to support the order picking process. We present our findings from three user studies and from demonstrations at several exhibitions. ...

Bjorn Schwerdtfeger; Gudrun Klinker

2008-09-01T23:59:59.000Z

192

Neptun Light: Order (2012-SE-3504)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Neptun Light, Inc. to pay a $13,000 civil penalty after finding Neptun Light had failed to certify that certain models of medium base compact fluorescent lamps comply with the applicable energy conservation standards.

193

Excellence Opto: Order (2013-CE-49002)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Excellence Opto, Inc. to pay a $8,000 civil penalty after finding Excellence Opto had failed to certify that certain models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

194

First-Order theorem proving and vampire  

Science Conference Proceedings (OSTI)

In this paper we give a short introduction in first-order theorem proving and the use of the theorem prover Vampire. We discuss the superposition calculus and explain the key concepts of saturation and redundancy elimination, present saturation algorithms ...

Laura Kovcs, Andrei Voronkov

2013-07-01T23:59:59.000Z

195

Anthony International: Order (2013-CE-5357)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Anthony International to pay a $8,000 civil penalty after finding Anthony International had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

196

Static solutions for fourth order gravity  

SciTech Connect

The Lichnerowicz and Israel theorems are extended to higher order theories of gravity. In particular it is shown that Schwarzschild is the unique spherically symmetric, static, asymptotically flat, black-hole solution, provided the spatial curvature is less than the quantum gravity scale outside the horizon. It is then shown that in the presence of matter (satisfying certain positivity requirements), the only static and asymptotically flat solutions of general relativity that are also solutions of higher order gravity are the vacuum solutions.

Nelson, William [Institute of Gravitation and the Cosmos, Penn State University, State College, Pennsylvania 16801 (United States)

2010-11-15T23:59:59.000Z

197

Executive Order 13007 Indian Sacred Sites (1996)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6771 6771 Federal Register / Vol. 61, No. 104 / Wednesday, May 29, 1996 / Presidential Documents Executive Order 13007 of May 24, 1996 Indian Sacred Sites By the authority vested in me as President by the Constitution and the laws of the United States, in furtherance of Federal treaties, and in order to protect and preserve Indian religious practices, it is hereby ordered: Section 1. Accommodation of Sacred Sites. (a) In managing Federal lands, each executive branch agency with statutory or administrative responsibility for the management of Federal lands shall, to the extent practicable, permitted by law, and not clearly inconsistent with essential agency functions, (1) accommodate access to and ceremonial use of Indian sacred sites by Indian religious practitioners and (2) avoid adversely affecting the physical integrity

198

Executive Order 12968 Access to Classified Information  

NLE Websites -- All DOE Office Websites (Extended Search)

40243 40243 Monday August 7, 1995 Part IV The President Executive Order 12968-Access to Classified Information Presidential Determination No. 95-32 of July 28, 1995 Presidential Determination No. 95-33 of July 31, 1995 Presidential Documents 40245 Federal Register Vol. 60, No. 151 Monday, August 7, 1995 Title 3- The President Executive Order 12968 of August 2, 1995 Access to Classified Information The national interest requires that certain information be maintained in confidence through a system of classification in order to protect our citizens, our democratic institutions, and our participation within the community of nations. The unauthorized disclosure of information classified in the national interest can cause irreparable damage to the national security and loss of human life.

199

Striped Order in AdS/CFT  

E-Print Network (OSTI)

We study the formation of inhomogeneous order in the Einstein-Maxwell-axion system, dual to a 2+1 dimensional field theory that exhibits a spontaneously generated current density, momentum density and modulated scalar operator. Below the critical temperature, the Reissner-Nordstrom-AdS black hole becomes unstable and stripes form in the bulk and on the boundary. The bulk geometry possesses striking geometrical features, including a modulated horizon that tends to pinch off as T -> 0. On a domain of fixed length, we find a second order phase transition to the striped solution in each of the grand canonical, canonical and microcanonical ensembles, with modulated charges that grow and saturate as we lower the temperature and descend into the inhomogeneous phase. For the black hole on an infinite domain, a similar second order transition occurs, and the width of the dominant stripe increases in the zero temperature limit.

Moshe Rozali; Darren Smyth; Evgeny Sorkin; Jared B. Stang

2013-04-10T23:59:59.000Z

200

Clean Cities: Coalitions in Order of Designation  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Coalitions in Order of Designation Coalitions in Order of Designation Each Clean Cities coalition is listed below by its original name and the date it became an official coalition. See also the list of dedesignated coalitions below. Sort by Original Coalition Name Sort by Designation Date Sort by Designation Order Atlanta, GA September 8th, 1993 1 Denver, CO September 13th, 1993 2 Philadelphia, PA September 22nd, 1993 3 Delaware October 12th, 1993 4 Las Vegas, NV October 18th, 1993 5 Washington, DC October 21st, 1993 6 Boston, MA March 18th, 1994 7 Austin, TX April 18th, 1994 8 Florida Gold Coast (Miami) May 5th, 1994 9 Chicago, IL May 13th, 1994 10 Albuquerque, NM June 1st, 1994 11 Wisconsin Southeast Area June 29th, 1994 12 Colorado Springs, CO July 13th, 1994 13 Long Beach, CA August 31st, 1994

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 1. REQUISITION NUMBER SP0600-06-0525 PAGE 1 OF 19 2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER SP0600-06-Q-0408 6. SOLICITATION ISSUE DATE March 8, 2006 7. FOR SOLICITATION INFORMATION CALL: a.NAME Leslie Simpson (703) 767-8536 b. TELEPHONE NUMBER (no collect calls) Phone: See Block 7A Fax: (703) 767-8757 8. OFFER DUE DATE/LOCAL TIME March 15, 2006, 12:00 Noon, Local Time, Fort Belvoir, Virginia 9. ISSUED BY CODE SP0600 10. THIS ACQUISITION IS UNRESTRICTED ⌧ SET ASIDE 100 % FOR

202

Order of Magnitude Comparisons of Distance  

E-Print Network (OSTI)

Order of magnitude reasoning - reasoning by rough comparisons of the sizes of quantities - is often called 'back of the envelope calculation', with the implication that the calculations are quick though approximate. This paper exhibits an interesting class of constraint sets in which order of magnitude reasoning is demonstrably fast. Specifically, we present a polynomial-time algorithm that can solve a set of constraints of the form 'Points a and b are much closer together than points c and d.' We prove that this algorithm can be applied if `much closer together' is interpreted either as referring to an infinite difference in scale or as referring to a finite difference in scale, as long as the difference in scale is greater than the number of variables in the constraint set. We also prove that the first-order theory over such constraints is decidable.

Davis, E

2011-01-01T23:59:59.000Z

203

Postmastectomy Chest Wall Radiation to a Temporary Tissue Expander or Permanent Breast Implant-Is There a Difference in Complication Rates?  

SciTech Connect

Purpose: The purpose of this study was to evaluate the likelihood of complications and cosmetic results among breast cancer patients who underwent modified radical mastectomy (MRM) and breast reconstruction followed by radiation therapy (RT) to either a temporary tissue expander (TTE) or permanent breast implant (PI). Methods and Materials: Records were reviewed of 74 patients with breast cancer who underwent MRM followed by breast reconstruction and RT. Reconstruction consisted of a TTE usually followed by exchange to a PI. RT was delivered to the TTE in 62 patients and to the PI in 12 patients. Dose to the reconstructed chest wall was 50 Gy. Median follow-up was 48 months. The primary end point was the incidence of complications involving the reconstruction. Results: There was no significant difference in the rate of major complications in the PI group (0%) vs. 4.8% in the TTE group. No patients lost the reconstruction in the PI group. Three patients lost the reconstruction in the TTE group. There were excellent/good cosmetic scores in 90% of the TTE group and 80% of the PI group (p = 0.22). On multivariate regression models, the type of reconstruction irradiated had no statistically significant impact on complication rates. Conclusions: Patients treated with breast reconstruction and RT can experience low rates of major complications. We demonstrate no significant difference in the overall rate of major or minor complications between the TTE and PI groups. Postmastectomy RT to either the TTE or the PI should be considered as acceptable treatment options in all eligible patients.

Anderson, Penny R. [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, PA (United States)], E-mail: p_anderson@fccc.edu; Freedman, Gary; Nicolaou, Nicos; Sharma, Navesh [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, PA (United States); Li Tianyu [Department of Biostatistics, Fox Chase Cancer Center, Philadelphia, PA (United States); Topham, Neal; Morrow, Monica [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, PA (United States)

2009-05-01T23:59:59.000Z

204

Forecast Bias Correction: A Second Order Method  

E-Print Network (OSTI)

The difference between a model forecast and actual observations is called forecast bias. This bias is due to either incomplete model assumptions and/or poorly known parameter values and initial/boundary conditions. In this paper we discuss a method for estimating corrections to parameters and initial conditions that would account for the forecast bias. A set of simple experiments with the logistic ordinary differential equation is performed using an iterative version of a first order version of our method to compare with the second order version of the method.

Crowell, Sean

2010-01-01T23:59:59.000Z

205

On First-Order Generalized Maxwell Equations  

E-Print Network (OSTI)

The generalized Maxwell equations including an additional scalar field are considered in the first-order formalism. The gauge invariance of the Lagrangian and equations is broken resulting the appearance of a scalar field. We find the canonical and symmetrical Belinfante energy-momentum tensors. It is shown that the traces of the energy-momentum tensors are not equal to zero and the dilatation symmetry is broken in the theory considered. The matrix Hamiltonian form of equations is obtained after the exclusion of the nondynamical components. The canonical quantization is performed and the propagator of the fields is found in the first-order formalism.

S. I. Kruglov

2006-10-18T23:59:59.000Z

206

Higher Order Differential Attack of Camellia (II)  

Science Conference Proceedings (OSTI)

Camellia is a 128-bit block cipher, proposed by NTT and Mitsubishi in 2000. It has been shown that 10 round variant without FL function under a 256-bit secret key is attackable by Higher Order Differential Attack and even if FL function is included, ...

Yasuo Hatano; Hiroki Sekine; Toshinobu Kaneko

2002-08-01T23:59:59.000Z

207

Efficiently ordering subgoals with access constraints  

Science Conference Proceedings (OSTI)

In this paper, we study the problem of ordering subgoals under binding pattern restrictions for queries posed as nonrecursive Datalog programs. We prove that despite their limited expressive power, the problem is computationally hardPSPACE-complete ... Keywords: binding pattern, executability, nonrecursive datalog, query

Guizhen Yang; Michael Kifer; Vinay K. Chaudhri

2006-06-01T23:59:59.000Z

208

General Restaurant Equipment: Order (2013-CE-5344)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered General Restaurant Equipment Co. to pay a $8,000 civil penalty after finding General Restaurant Equipment had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

209

Propagation algorithms for lexicographic ordering constraints  

Science Conference Proceedings (OSTI)

Finite-domain constraint programming has been used with great success to tackle a wide variety of combinatorial problems in industry and academia. To apply finite-domain constraint programming to a problem, it is modelled by a set of constraints on a ... Keywords: artificial intelligence, constraint programming, constraint propagation, constraints, generalized arc consistency, lexicographic ordering, matrix models, symmetry, symmetry breaking

Alan M. Frisch; Brahim Hnich; Zeynep Kiziltan; Ian Miguel; Toby Walsh

2006-07-01T23:59:59.000Z

210

Broadband ML estimation under model order uncertainty  

Science Conference Proceedings (OSTI)

The number of signals hidden in data plays a crucial role in array processing. When this information is not available, conventional approaches apply information theoretic criteria or multiple hypothesis tests to simultaneously estimate model order and ... Keywords: Broadband signals, Direction of arrival, Maximum likelihood estimation, Overparameterized models, Unknown number of signals

Pei-Jung Chung; Mats Viberg; Christoph F. Mecklenbruker

2010-05-01T23:59:59.000Z

211

GE Appliances: Order (2012-SE-1403)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered GE Appliances, a Division of General Electric Company to pay a $63,000 civil penalty after finding GE had privately labeled and distributed in commerce in the U.S. the 4-cubic-foot capacity refrigerator basic model SMR04GAZCS, which includes models SMR04GAZACS and SMR04GAZBCS.

212

Lutron Electronics: Order (2012-SE-3796)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Lutron Electronics Co., Inc. to pay a $82,478 civil penalty after finding Lutron Electronics had manufactured and distributed in commerce in the U.S. at least 79,000 units of various basic models of noncompliant Class A external power supplies.

213

Kingspan Insulated Panels: Order (2013-CE-5353)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Kingspan Insulated Panels, Inc. to pay a $8,000 civil penalty after finding Kingspan Insulated Panels had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

214

MC Appliance: Order (2012-CE-1508)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered CNA International Inc. d/b/a MC Appliance Corporation to pay a $8,000 civil penalty after finding MC Appliance had failed to certify that certain models of room air conditioners comply with the applicable energy conservation standards.

215

Order Module--U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: GETTING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order Module--U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: Order Module--U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: GETTING STARTED Order Module--U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: GETTING STARTED This course was developed using the Criterion Referenced Instruction (CRI) method of training. That means the course contains only the information you need to perform your job. You will be shown the learning objectives at the beginning of the course. If you think you can demonstrate competency without additional instruction, you may complete the practice at any time. When you complete all of the practices successfully, you may ask the course manager for the criterion test. The familiar level requires that you understand and remember the material. The general level requires that you understand the applicability of the material. If you are unsure of the

216

Sixth-order and Seventh-order Iterative Methods for Solving Nonlinear Equations  

E-Print Network (OSTI)

In this article, we discuss sixth-order and seventh-order iterative methods for nonlinear equations. Derivative-based and derivative-free, both categories are presented for said iterative methods. Especially sixth-order derivative-based and derivative-free iterative families are constructed in such a way that they circumstance a wide class of sixth-order methods which are developed in last many years. Weight functions are introduced to enhance the efficiency and parametric combination gives weight-age flexibility in between weight functions.

Fayyaz Ahmad; Domingo Garca-Senz

2013-02-13T23:59:59.000Z

217

FAQ: The Department of Energy's Order Denying Rehearing of the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Order Denying Rehearing of the Department's National Electric Transmission Congestion Report and Order: March 6, 2008 FAQ: The Department of Energy's Order...

218

Lumiram Electric: Order (2010-CE-1014) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lumiram Electric: Order (2010-CE-1014) Lumiram Electric: Order (2010-CE-1014) November 23, 2010 DOE issued an Order and entered into a Compromise Agreement with Lumiram Electric...

219

Innovative Concept Appliances: Order (2010-CE-03/0415) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order (2010-CE-030415) Innovative Concept Appliances: Order (2010-CE-030415) November 1, 2010 DOE issued an Order after entering into a Compromise Agreement with Innovative...

220

GE Appliances: Order (2010-CE-2113) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order (2010-CE-2113) GE Appliances: Order (2010-CE-2113) September 27, 2010 DOE issued an Order after entering into a Compromise Agreement with General Electric Appliances after...

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Manitowoc Foodservice: Order (2012-CE-5309)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manitowoc Foodservicc, Manitowoc Foodservicc, Respondent Issued: July 20, 2012 BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 2012-CE-5309 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Manitowoc Foodservice ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. § 429.12. 2. DOE and Respondent have mutually agreed to the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference.

222

Executive Order 13514 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

514 514 Executive Order 13514 October 8, 2013 - 1:41pm Addthis Executive Order (E.O.) 13514, Federal Leadership in Environmental, Energy, and Economic Performance, was signed on October 5, 2009. It expanded upon the energy reduction and environmental performance requirements of E.O. 13423. E.O. 13514 sets numerous Federal energy requirements the following. This summary is intended as a reference only. Refer to the full text of E.O. 13514 for more details relevant to your work. Accountability and Transparency E.O. 13514 accountability, transparency, and reporting requirements include: Within 30 days, Federal agency heads must designate a senior management official to serve as Senior Sustainability Officer accountable for agency conformance. The Senior Sustainability Officer designation must be reported

223

Danby Order & Compromise Agreement.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Danby Products, Inc., Danby Products, Inc., Respondent Issued: August 9, 2012 BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 2012-CE-1415 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Danby Products, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance cetiification requirements located at I 0 C.F.R. § 429.12. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

224

International Refrigeration: Order (2012-CE-1510)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASHINGTON, D.C. 20585 WASHINGTON, D.C. 20585 Case Number: 2012-CE-1510 International Refrigeration Products, Respondent ) ) ) ) ) ) ORDER Issued: July 20, 2012 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and International Refrigeration Products ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.P.R. § 429.12. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

225

Consent Order EA-2005-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, DC 20585 Washington, DC 20585 July 28, 2005 Mr. T. E. Logan, President Bechtel Hanford, Inc. 3070 George Washington Way Richland, WA 99352 Consent Order 2005-01 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Bechtel Hanford, Inc. Dear Mr. Logan: The Department of Energy (DOE) has reviewed Bechtel Hanford, Inc.'s (Bechtel Hanford) investigation and supporting documentation associated with two events occurring at the 618-2 Burial Ground in December 2004. These events resulted in significant personnel uptakes to two individuals. Bechtel Hanford reported these events using the Noncompliance Tracking System (NTS) on January 26, 2005, (NTS -RL-BHI- REMACT-2005-0001, Hazard Identification and Personnel Exposure at 618-2 Historical

226

Executive Order 13221 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

221 221 Executive Order 13221 October 8, 2013 - 1:48pm Addthis Executive Order (E.O.) 13221, Energy-Efficient Standby Power Devices, calls for Federal agencies to purchase products that use minimal standby power when possible. It was signed on August 2, 2001. Requirements for Energy Efficiency and Standby Power This section outlines major requirements defined by E.O. 13221. The content is intended as a reference only. You should refer to the text of E.O. 13221 for more details relevant to your work. Federal agencies must purchase products that use no more than one watt in standby power consuming mode when purchasing commercially-available, off-the-shelf products that use external standby power devices or that contain an internal standby power function. If such products are not available, agencies shall purchase products with

227

Executive Order 13423 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

423 423 Executive Order 13423 October 8, 2013 - 1:44pm Addthis Executive Order (E.O.) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, was signed on January 24, 2007, to strengthen key goals for the Federal Government. It set more challenging goals than the Energy Policy Act of 2005 (EPAct 2005) and superseded E.O. 13123 and E.O. 13149. This summary below is intended as a reference only. You should refer to the full text of E.O. 13423 for more details relevant to your work. Implementing Instructions In consultation with the Director of the Office of Management and Budget, the Chairman of the Council on Environmental Quality issued instructions and defined requirements for implementing E.O. 13423. The implementation instructions identify the entities responsible for coordination and

228

GE_Order_and_Compromise_Agreement.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GE Appliances, a Division of GE Appliances, a Division of General Electric Company, Respondent ) ) ) ) ) ) ORDER By the General Counsel, U.S. Department of Energy: Case Number: 2012-SE-1403 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and GE Appliances, a Division of General Electric Company ("Respondent"). The Compromise Agreement resolves the case initiated after DOE was informed, based on test results made available as a result of verification testing by the Association of Home Appliance Manufacturers ("AHAM"), that aGE refrigerator basic model may not meet the energy conservation standard set forth in 10 C.F.R. § 430.32(a). 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that

229

Royal Centurion: Order (2012-CE-3608)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Royal Centurion, Inc. Royal Centurion, Inc. Respondent Issued: October 2, 2012 BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 2012-CE-3608 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into by the U.S. Department of Energy ("DOE") and Royal Centurion, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. § 429.12. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

230

DOE Order Self Study Modules - Getting Started  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Getting Started DOE Orders Self-Study Program Getting Started August 2011 1 U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM GETTING STARTED This course was developed using the Criterion Referenced Instruction (CRI) method of training. That means the course contains only the information you need to perform your job. You will be shown the learning objectives at the beginning of the course. If you think you can demonstrate competency without additional instruction, you may complete the practice at any time. When you complete all of the practices successfully, you may ask the course manager for the criterion test. The familiar level requires that you understand and remember the material. The general level requires that you understand the applicability of the material. If you are unsure of the level of proficiency

231

Goodman Manufacturing: Order (2012-CE-1509)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company, Company, L.P., Respondent Issued: August 7, 2012 ) ) ) ) ) ) ORDER Case Number: 2012-CE-1509 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Goodman Manufacturing Company, L.P. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. § 429.12. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

232

Aging, phase ordering and conformal invariance  

E-Print Network (OSTI)

In a variety of systems which exhibit aging, the two-time response function scales as $R(t,s)\\approx s^{-1-a} f(t/s)$. We argue that dynamical scaling can be extended towards conformal invariance, obtaining thus the explicit form of the scaling function $f$. This quantitative prediction is confirmed in several spin systems, both for $Tordering) and $T=T_c$ (non-equilibrium critical dynamics). The 2D and 3D Ising models with Glauber dynamics are studied numerically, while exact results are available for the spherical model with a non-conserved order parameter, both for short-ranged and long-ranged interactions, as well as for the mean-field spherical spin glass.

Malte Henkel; Michel Pleimling; Claude Godreche; Jean-Marc Luck

2001-07-13T23:59:59.000Z

233

Law and Order, or Counterintelligence Activities  

E-Print Network (OSTI)

assign responsibilities for carrying of firearms and the use of force by DoD personnel engaged in security, law and order, or counterintelligence activities. b. Cancels Deputy Secretary of Defense Memorandum (Reference (b)). c. Implements section 1585 of title 10, United States Code (U.S.C.) (Reference (c)), which authorizes civilian officers and employees of the Department of Defense to carry firearms or other appropriate weapons while assigned investigative duties or such other duties as the Secretary of Defense may prescribe, under regulations to be prescribed by the Secretary. d. Provides requirements, authorizations, and restrictions for carrying firearms and the use of force to protect DoD installations, property, and personnel, and to enforce law and order in accordance with DoD Instruction (DoDI) 5200.08 and DoD 5200.08-R (References (d) and (e)). e. Provides overarching guidance for developing DoD Component policies, regulations, and procedures.

unknown authors

2011-01-01T23:59:59.000Z

234

Ordered transport and identification of particles  

DOE Patents (OSTI)

A method and apparatus are provided for application of electrical field gradients to induce particle velocities to enable particle sequence and identification information to be obtained. Particle sequence is maintained by providing electroosmotic flow for an electrolytic solution in a particle transport tube. The transport tube and electrolytic solution are selected to provide an electroosmotic radius of >100 so that a plug flow profile is obtained for the electrolytic solution in the transport tube. Thus, particles are maintained in the same order in which they are introduced in the transport tube. When the particles also have known electrophoretic velocities, the field gradients introduce an electrophoretic velocity component onto the electroosmotic velocity. The time that the particles pass selected locations along the transport tube may then be detected and the electrophoretic velocity component calculated for particle identification. One particular application is the ordered transport and identification of labeled nucleotides sequentially cleaved from a strand of DNA.

Shera, E.B.

1993-05-11T23:59:59.000Z

235

Ordered transport and identification of particles  

DOE Patents (OSTI)

A method and apparatus are provided for application of electrical field gradients to induce particle velocities to enable particle sequence and identification information to be obtained. Particle sequence is maintained by providing electroosmotic flow for an electrolytic solution in a particle transport tube. The transport tube and electrolytic solution are selected to provide an electroosmotic radius of >100 so that a plug flow profile is obtained for the electrolytic solution in the transport tube. Thus, particles are maintained in the same order in which they are introduced in the transport tube. When the particles also have known electrophoretic velocities, the field gradients introduce an electrophoretic velocity component onto the electroosmotic velocity. The time that the particles pass selected locations along the transport tube may then be detected and the electrophoretic velocity component calculated for particle identification. One particular application is the ordered transport and identification of labeled nucleotides sequentially cleaved from a strand of DNA.

Shera, E. Brooks (Los Alamos, NM)

1993-01-01T23:59:59.000Z

236

High order well-balanced schemes  

SciTech Connect

In this paper the authors review some recent work on high-order well-balanced schemes. A characteristic feature of hyperbolic systems of balance laws is the existence of non-trivial equilibrium solutions, where the effects of convective fluxes and source terms cancel each other. Well-balanced schemes satisfy a discrete analogue of this balance and are therefore able to maintain an equilibrium state. They discuss two classes of schemes, one based on high-order accurate, non-oscillatory finite difference operators which are well-balanced for a general class of equilibria, and the other one based on well-balanced quadratures, which can - in principle - be applied to all equilibria. Applications include equilibria at rest, where the flow velocity vanishes, and also the more challenging moving flow equilibria. Numerical experiments show excellent resolution of unperturbed as well as slightly perturbed equilibria.

Noelle, Sebastian [Institut fur Physikalische Chemie der RWTH; Xing, Yulong [ORNL; Shu, Chi-wang [Brown University

2010-01-01T23:59:59.000Z

237

Orientational Ordering and Dynamics of Rodlike Polyelectrolytes  

E-Print Network (OSTI)

The interplay between electrostatic interactions and orientational correlations is studied for a model system of charged rods positioned on a chain, using Monte Carlo simulation techniques. It is shown that the coupling brings about the notion of {\\em electrostatic frustration}, which in turn results in: (i) a rich variety of novel orientational orderings such as chiral phases, and (ii) an inherently slow dynamics characterized by stretched-exponential behavior in the relaxation functions of the system.

Hossein Fazli; Ramin Golestanian; Mohammad R. Kolahchi

2007-01-11T23:59:59.000Z

238

Large orders in strong-field QED  

E-Print Network (OSTI)

We address the issue of large-order expansions in strong-field QED. Our approach is based on the one-loop effective action encoded in the associated photon polarisation tensor. We concentrate on the simple case of crossed fields aiming at possible applications of high-power lasers to measure vacuum birefringence. A simple next-to-leading order derivative expansion reveals that the indices of refraction increase with frequency. This signals normal dispersion in the small-frequency regime where the derivative expansion makes sense. To gain information beyond that regime we determine the factorial growth of the derivative expansion coefficients evaluating the first 80 orders by means of computer algebra. From this we can infer a nonperturbative imaginary part for the indices of refraction indicating absorption (pair production) as soon as energy and intensity become (super)critical. These results compare favourably with an analytic evaluation of the polarisation tensor asymptotics. Kramers-Kronig relations finally allow for a nonperturbative definition of the real parts as well and show that absorption goes hand in hand with anomalous dispersion for sufficiently large frequencies and fields.

Thomas Heinzl; Oliver Schroeder

2006-05-12T23:59:59.000Z

239

Second-Order Closure PBL Model with New Third-Order Moments: Comparison with LES Data  

Science Conference Proceedings (OSTI)

This paper contains two parts. In the first part, a new set of diagnostic equations is derived for the third-order moments for a buoyancy-driven flow, by exact inversion of the prognostic equations for the third-order moment equations in the ...

V. M. Canuto; F. Minotti; C. Ronchi; R. M. Ypma; O. Zeman

1994-06-01T23:59:59.000Z

240

Order Module--NNSA Orders Self-Study Program Safety Basis Documentation |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSA Orders Self-Study Program Safety Basis NNSA Orders Self-Study Program Safety Basis Documentation Order Module--NNSA Orders Self-Study Program Safety Basis Documentation The familiar level of this module is divided into five sections. In the first section, we will discuss the regulation. In the second, third, and fourth sections, we will discuss the U. Department of Energy (DOE) guides for documented safety analyses (DSAs), technical safety requirements (TSRs), and unreviewed safety questions (USQs). Section 5 discusses the DOE standard related to DSAs and TSRs. We have provided several examples and practices throughout the module to help familiarize you with the material. The practices will also help prepare you for the criterion test. DOE Order Self Study Modules - 10 CFR 830 Safety Basis Documentation

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EVALUATING SHRINKAGE AND CRACKING BEHAVIOR OF CONCRETE USING RESTRAINED RING  

E-Print Network (OSTI)

and Berke (1997), Shah, Weiss, and Yang (1998), Weiss and Shah (2002), See, Attiogbe, and Miltenberger (2003

Peterson, Blake R.

242

Stripe Dynamics, Global Phase Ordering and Quantum  

E-Print Network (OSTI)

By modeling the stripe phase in cuprates as spin gapped stripes coupled to the RVB liquid of preformed electron pairs, I derive the low energy effective theory of the RVB phase variable. It is found that the effect of stripe dynamics (including both longitudinal and transverse modes) leads to incipient temporal phase stiffness in the RVB liquid, which tunes a quantum phase transition toward a superconducting ground state with global phase order. Physical consequences of this quantum criticality are discussed. Typeset using REVTEX 1 I.

Criticality High; Tc Superconductors; Wenjun Zheng

2000-01-01T23:59:59.000Z

243

Order Module--U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: GETTING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: GETTING STARTED Order Module--U.S. DEPARTMENT OF ENERGY ORDERS SELF-STUDY PROGRAM: GETTING STARTED This course was developed using the Criterion Referenced Instruction (CRI) method of training. That means the course contains only the information you need to perform your job. You will be shown the learning objectives at the beginning of the course. If you think you can demonstrate competency without additional instruction, you may complete the practice at any time. When you complete all of the practices successfully, you may ask the course manager for the criterion test. The familiar level requires that you understand and remember the material. The general level requires that you understand the applicability of the material. If you are unsure of the

244

Order Module--DOE Order 225.1B, ACCIDENT INVESTIGATIONS | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order 225.1B, ACCIDENT INVESTIGATIONS Order 225.1B, ACCIDENT INVESTIGATIONS Order Module--DOE Order 225.1B, ACCIDENT INVESTIGATIONS DOE O 225.1B prescribes organizational responsibilities, authorities, and requirements for conducting investigations of certain accidents occurring at DOE sites, facilities, areas, operations, and activities. The purpose of the accident investigation is to understand and identify the causes that contributed to the accident so those deficiencies can be addressed and corrected. This, in turn, is intended to prevent recurrence and promote improved environmental protection and safety and health of DOE employees, contractors, and the public. Moreover, accident investigations are used to promote the values and concepts of a learning organization. The department's integrated safety management (ISM) feedback and improvement

245

Federal Energy Management Program: Executive Order 13514  

NLE Websites -- All DOE Office Websites (Extended Search)

514 514 Executive Order (E.O.) 13514; Federal Leadership in Environmental, Energy, and Economic Performance; was signed on October 5, 2009. It expanded upon the energy reduction and environmental performance requirements of E.O. 13423. E.O. 13514 sets numerous Federal energy requirements in several areas, including: Accountability and Transparency Strategic Sustainability Performance Planning Greenhouse Gas Management Sustainable Buildings and Communities Water Efficiency Electronic Products and Services Fleet and Transportation Management Pollution Prevention and Waste Reduction The summary below is intended as a reference only. Refer to the full text of E.O. 13514 for more details relevant to your work. Accountability and Transparency E.O. 13514 accountability, transparency, and reporting requirements include:

246

Consent Order of Dismissal, Section III  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 SRR-ESH-2013-00054 Revision 1 August 28, 2013 Page 1 of 6 Consent Order of Dismissal, Section III.7 Z-Area Saltstone Disposal Facility Permit General Condition B.5.a-h Information Permit Condition Requirement Estimated Value Updated Value Comments B.5 a) Cumulative process volume of salt waste disposed to date Not Applicable 7,845 kgals Vault 4, Cells B, D, E, F, H, J, K, L SDU 2, Cells 2A and 2B b) Process volume of saltstone grout disposed and vault/disposal unit location (including cell identity) for the reporting period Not Applicable 3.0 x 10 2 kgals SDU 2, Cell 2A 2.6 x 10 2 kgals SDU 2, Cell 2B c) Cumulative process volume of saltstone grout disposed to date Not Applicable 1.4 x 10 4 kgals Vault 4, Cells B, D, E, F, H, J, K, L

247

Lumiram Electric: Order (2010-CE-1014)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lumiram Electric Corporation, Lumiram Electric Corporation, Respondent Issued : November 23, 2010 By the General Counsel, U.S. Department of Energy: Case Number: 2010-CE-1014 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Lumiram Electric Corporation ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements at 10 C.F.R. § 430.62. 2. The DOE and Respondent have negotiated the terms of the Compromise Agreement that resolve this matter . A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts before me, I find that the public interest would be served by adopting the

248

Proposed Strategy to meet DOE Order 231  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 Page 1 Proposed Strategy to meet DOE Order 231.1B, Preparation of Annual Site Environmental Reports Background The U.S. Department of Energy Office (DOE) of Legacy Management (LM) was established in 2003 to manage the Department's post-closure responsibilities at sites under LM's care and ensure the future protection of human health and the environment at those sites. The histories of the legacy sites vary, as does the regulatory regime under which the sites are managed. Long- term surveillance plans (LTSPs) are prepared for the majority of the sites. These LTSPs, which are available to the public, include site descriptions, information about site history, nature and extent of contamination, institutional controls, closeout condition of the site, present and future

249

O:\ELECTRIC\ORDERS\EA-223.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CMS Marketing, Services and Trading Company CMS Marketing, Services and Trading Company Order No. EA-223 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 12, 2000, CMS Marketing, Services and Trading Company (CMS MS&T) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. CMS MS&T, a Michigan corporation, is a wholly owned subsidiary of CMS Enterprises Company which is in turn a wholly owned subsidiary of CMS Energy Corporation. CMS MS&T is a power marketer that does not own or control any electric generation, transmission, or distribution facilities, nor does it have any franchised electric service

250

Consent Order EA-2000-07  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2000 1, 2000 Dr. Benjamin Pellegrini [ ] Mason & Hanger Corporation P.O. Box 30020 Amarillo, TX 79120-0020 EA 2000-07 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Mason & Hanger Corporation Dear Dr. Pellegrini: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances presented to DOE by Mason & Hanger Corporation's (M&H or the contractor) internal evaluation of the Building 12-79 HPFL Valve Misposition at the Pantex Plant, which was identified on November 19, 1999. In January 1998, the contractor identified a systemic problem at the site in Building 12-98 when it was determined that certain high-pressure fire suppression valves were left in the closed position, which would have prevented their activation in

251

Consent Order EA-2000-09  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ms. M. P. Delozier Ms. M. P. Delozier [ ] CH2M Hill Hanford Group, Inc. MSIN: H6-08 2440 Stevens Center Richland, WA 99352 EA-2000-09 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and CH2M Hill Hanford Group, Inc. Dear Ms. Delozier: This letter refers to the Department of Energy's (DOE) evaluation of an internal investigation conducted by CH2M Hill Group, Inc. (CHG) in February 2000. The investigation examined the facts and circumstances surrounding quality problems with the procurement of safety class piping for the W-314 Project at the Tank Farm Waste Remediation System. The piping had been procured and accepted for use by a subcontractor to CHG. Workers identified deficiencies with piping welds when they removed piping from a container. The deficiencies could have resulted in significant consequences to the

252

Consent Order EA-2000-10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mr. Robert P. Heck, II Mr. Robert P. Heck, II [ ] Fluor Federal Services P.O. Box 1050 MSIN: B7-50 Richland, WA 99352 EA-2000-10 Subject: Consent Order Incorporating Agreement between U. S. Department of Energy and Fluor Federal Services Dear Mr. Heck: This letter refers to the Department of Energy's (DOE) evaluation of two internal investigations conducted by Fluor Hanford, Inc. and CH2M Hanford Group, Inc. in which Fluor Federal Services (FFS) jointly participated. Collectively, the two investigations examined the facts and circumstances surrounding quality problems with the procurement of safety class piping for the W-314 Project at the Tank Farm Waste Remediation System and reviewed the adequacy and effectiveness of FFS's procurement quality assurance program. FFS provides services for DOE prime contractors relating to DOE nuclear activities.

253

Order and disorder in columnar joints  

E-Print Network (OSTI)

Columnar joints are three-dimensional fracture networks that form in cooling basalt and several other media. The network organizes itself into ordered, mostly hexagonal columns. The same pattern can be observed on a smaller scale in desiccating starch. We show how surface boundary conditions in the desiccation of starch affect the formation of columnar joints. Under constant drying power conditions, we find a power law dependence of columnar cross-sectional area with depth, while under constant drying rate conditions this coarsening is eventually halted. Discontinuous transitions in pattern scale can be observed under constant external conditions, which may prompt a reinterpretation of similar transitions found in basalt. Starch patterns are statistically similar to those found in basalt, suggesting that mature columnar jointing patterns contain inherent residual disorder, but are statistically scale invariant.

Lucas Goehring; Stephen W. Morris

2005-01-03T23:59:59.000Z

254

Microsoft PowerPoint - Executive Order13423rbl  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Order 13423 Executive Order 13423 Executive Order 13423 Strengthening Federal Strengthening Federal Environmental, Energy and Environmental, Energy and Transportation Management Transportation Management 2 2 Executive Order 13423 Replaces the Executive Order 13423 Replaces the Greening the Government Series of Greening the Government Series of Executive Orders Executive Orders 13101 Recovered Materials 13101 Recovered Materials 13123 Energy Efficiency 13123 Energy Efficiency 13148 Environment 13148 Environment 13149 Transportation 13149 Transportation BUT BUT 13221 Standby Power was retained 13221 Standby Power was retained 3 3 Two Parts Involved Two Parts Involved Executive Order Executive Order States Policy States Policy Establishes Goals Establishes Goals Assigns Responsibilities for Agencies, CEQ, Assigns Responsibilities for Agencies, CEQ,

255

Sanyo Electric: Order (2010-CE-1210) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Sanyo Electric: Order (2010-CE-1210) Sanyo Electric: Order (2010-CE-1210) October 13, 2010 DOE issued an Order and entered into a Compromise Agreement with Sanyo E&E Corp. after...

256

Modeling interval order structures with partially commutative monoids  

Science Conference Proceedings (OSTI)

Interval order structures are useful tools to model abstract concurrent histories, i.e. sets of equivalent system runs, when system runs are modeled with interval orders. The paper shows how interval order structures can be modeled by partially ...

Ryszard Janicki; Xiang Yin; Nadezhda Zubkova

2012-09-01T23:59:59.000Z

257

GE Lighting Solutions: Order (2013-SE-4901) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order (2013-SE-4901) GE Lighting Solutions: Order (2013-SE-4901) April 4, 2013 DOE ordered General Electric Lighting Solutions, LLC to pay a 5,360 civil penalty after finding GE...

258

Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Orders and Applicable CFRsDEAR Crosswalk - February 2, 2002 Technical Standards, DOE Orders and Applicable CFRsDEAR Crosswalk - February 2, 2002 February 2, 2002 DOE Orders...

259

AM Conservation: Order (2010-CW-1415) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AM Conservation: Order (2010-CW-1415) AM Conservation: Order (2010-CW-1415) September 20, 2010 DOE ordered AM Conservation Group, Inc. to pay a 5,000 civil penalty after finding...

260

Electrolux: Order (2012-CE-1901) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Order (2012-CE-1901) More Documents & Publications Electrolux: Proposed Penalty (2012-CE-1901) Electrolux: ENERGY STAR Referral (EIDW6305***) ASKO Appliances: Order...

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Duracold Refrigeration Manufacturing: Order (2013-CE-5342) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Duracold Refrigeration Manufacturing: Order (2013-CE-5342) Duracold Refrigeration Manufacturing: Order (2013-CE-5342) Duracold Refrigeration Manufacturing: Order (2013-CE-5342) April 25, 2013 DOE ordered Duracold Refrigeration Manufacturing Company, LLC to pay a $8,000 civil penalty after finding Duracold Refrigeration Manufacturing had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and Duracold Refrigeration Manufacturing. Duracold Refrigeration Manufacturing: Order (2013-CE-5342) More Documents & Publications Duracold Refrigeration Manufacturing: Proposed Penalty (2013-CE-5342) North Star Refrigerator: Order (2013-CE-5355) Schott Gemtron: Order (2013-CE-5358

262

Executive Order 13148-Greening the Government Through Leadership...  

NLE Websites -- All DOE Office Websites (Extended Search)

You are here Home Executive Order 13148-Greening the Government Through Leadership in Environmental Management Executive Order 13148-Greening the Government Through Leadership...

263

Acuity: Order (2013-CE-4802) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications Acuity: Proposed Penalty (2013-CE-4802) General Restaurant Equipment: Order (2013-CE-5344) Diversified Panel Systems: Order (2013-CE-5346...

264

BSH: Order (2013-CE-2001) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

(2013-CE-2001) More Documents & Publications BSH: Proposed Penalty (2013-CE-2001) General Restaurant Equipment: Order (2013-CE-5344) Imperial Manufacturing: Order (2013-CE-5322)...

265

President Issues Executive Order Aimed at Preparing for the Impacts...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

President Issues Executive Order Aimed at Preparing for the Impacts of Climate Change; Tribal Leaders to Serve on Task Force President Issues Executive Order Aimed at Preparing for...

266

Executive Order -- Preparing the United States for the Impacts...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Order -- Preparing the United States for the Impacts of Climate Change Executive Order -- Preparing the United States for the Impacts of Climate Change...

267

FEMP SERVICES INTERAGENCY AGREEMENT WORK ORDER FOR SKAGGS AMENDMENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORDER FOR SKAGGS AMENDMENT TRANSACTIONS Document details the Federal Energy Management Program (FEMP) interagency agreement work order for the Skaggs Amendment Transactions....

268

An acceleration procedure for optimal first-order methods  

E-Print Network (OSTI)

Jul 17, 2012 ... As compared with standard optimal first-order methods, our schemes allows us to divide computation times by two to three orders of magnitude...

269

American Indian Policy and Relevant DOE and Executive Orders...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Programs American Indian Policy and Relevant DOE and Executive Orders American Indian Policy and Relevant DOE and Executive Orders Waste Management Nuclear Materials &...

270

A remark on higher order RUE-resolution with EXTRUE  

E-Print Network (OSTI)

We show that a prominent counterexample for the completeness of first order RUE-resolution does not apply to the higher order RUE-resolution approach EXTRUE.

Benzmueller, Christoph

2009-01-01T23:59:59.000Z

271

Crosswalk Tables for DOE Orders, Technical Standards, and CFR...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Center DOE Technical Standards Program Crosswalk Tables for DOE Orders, Technical Standards, and CFRDEAR Crosswalk Tables for DOE Orders, Technical Standards,...

272

Interior Proximal Algorithm with Variable Metric for Second-Order ...  

E-Print Network (OSTI)

Second-Order Cone Programming: Applications to ... + denotes the second-order cone (SOC) (also called the Lorentz cone or ...... which does not depend on l:.

273

Comments on Emergency Order to Resume Limited Operation at the...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Emergency Order to Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA from the Chesapeake Climate Action Network. Comments on Emergency Order to...

274

Non-stoichiometric ordered niobate and tungstate perovskites ...  

Science Conference Proceedings (OSTI)

... Non-stoichiometric ordered niobate and tungstate perovskites for microwave applications. Hui Wu, University of Pennsylvania. ...

275

Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422.1, CONDUCT OF OPERATIONS 422.1, CONDUCT OF OPERATIONS Order Module--DOE Order 422.1, CONDUCT OF OPERATIONS The general approach to implementing DOE O 422.1 is for contractors to develop, for DOE line management approval, documentation demonstrating implementation of the requirements in the contractor requirements document (CRD). DOE line management means the Federal officials such as Secretarial Officers and heads of field elements responsible for DOE facilities and operations. It is necessary to provide a conduct of operations matrix, which is a list of CRD requirements, citing the specific documentation that implements each item, or providing justification for each item that is not implemented. DOE line management must determine which facilities, other than hazard category 1, 2, and 3 nuclear facilities, require implementation

276

American Power: Order (2010-CE-0911) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power: Order (2010-CE-0911) Power: Order (2010-CE-0911) American Power: Order (2010-CE-0911) October 5, 2010 DOE issued an Order and entered into a Compromise Agreement with American Power Solutions, Inc. American Power had not certified compliance with the energy conservation standards for a general service flurorescent lamp it advertised on its website as manufactured by American Power. American Power notified DOE that it does not manufacture, import, or private label this model, but instead purchases it from GE and MaxLite. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and American Power. American Power: Order (2010-CE-0911) More Documents & Publications Westinghouse Lighting: Order (2010-CE-09/1001) Philips: Order (2012-SE-2605) Simkar: Order (2012-SE-5408)

277

Order Frequency Doses Distributed to Provider per Year  

E-Print Network (OSTI)

Economic Order Quantity (EOQ) is used to manage publicly-funded vaccine ordering and distribution more effectively. EOQ balances provider order size, order frequency, the timing of orders, and storage and handling to minimize costs and improve efficiencies as orders flow through the system. EOQ is one of several Vaccine Management Business Improvement Project (VMBIP) Continuous Quality Improvement initiatives offered by CDC to help manage publicly-funded vaccine orders by using industry best practices. There are two key components of EOQ: vaccine order frequency and two-week order windows. EOQ assigns a vaccine order frequency (i.e., monthly, bimonthly, or quarterly) based on the size of the population served with publicly-funded vaccine by each provider. Vaccine order frequency refers to how often a provider should place an order. EOQ excludes direct-shipped vaccine, influenza vaccine (seasonal and H1N1), and vaccine on allocation for less than six months, and also enables grantees to assign a different order frequency to certain providers based on unique characteristics at those provider sites. EOQ is also tailored for grantees in which McKesson Specialty Distribution does not ship directly to providers. Standard EOQ order frequencies are as follows:

unknown authors

2010-01-01T23:59:59.000Z

278

Memorandum of Understanding on Environmental Justice and Executive Order 12898  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ON ON ENVIRONMENTAL JUSTICE AND EXECUTIVE ORDER 12898 WHEREAS, on February 11, 1994, the President signed Executive Order 12898, "Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations" ("Executive Order 12898" or "Order"), and issued an accompanying Presidential Memorandum (references to this Order herein also generally include this Memorandum), and WHEREAS, Executive Order 12898 applies to the following agencies: the Department of Agriculture, Department of Commerce, Department of Defense, Department of Energy, Department of Health and Human Services, Department of Housing and Urban Development, Department of the Interior, Department of Justice, Department of Labor, Department of Transportation, and the Environmental

279

American Power: Order (2010-CE-0911) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Power: Order (2010-CE-0911) American Power: Order (2010-CE-0911) American Power: Order (2010-CE-0911) October 5, 2010 DOE issued an Order and entered into a Compromise Agreement with American Power Solutions, Inc. American Power had not certified compliance with the energy conservation standards for a general service flurorescent lamp it advertised on its website as manufactured by American Power. American Power notified DOE that it does not manufacture, import, or private label this model, but instead purchases it from GE and MaxLite. The Order adopted a Compromise Agreement, which reflected settlement terms between DOE and American Power. American Power: Order (2010-CE-0911) More Documents & Publications Westinghouse Lighting: Order (2010-CE-09/1001) Maxlite: Order (2010-CE-2701)

280

Revision to DOE Order 435.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Management » Compliance » Revision to DOE Program Management » Compliance » Revision to DOE Order 435.1 Revision to DOE Order 435.1 The Office of Environmental Management has primary responsibility, within DOE, for DOE Order 435.1, the self-regulation of radioactive waste management. As part of this responsibility, EM has decided to update the Order to incorporate several changes to the regulatory process that have taken place over the last decade as well as streamline the Order to improve management of the waste. A comprehensive complex-wide review of DOE radioactive waste management activities associated with implementation of the requirements of DOE Order 435.1, Radioactive Waste Management, was conducted in 2010 in order to gather feedback on the effectiveness of the DOE Order 435.1 requirements (not to assess compliance with the

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Applied Science and Technology Task Order Fiscal Year 2009 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End...

282

Applied Science and Technology Task Order Fiscal Year 2010 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End...

283

Applied Science and Technology Task Order Fiscal Year 2011 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End...

284

Applied Science and Technology Task Order Fiscal Year 2008 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End...

285

DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orders Mirant Power Plant to Operate Under Limited Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest reasonable impact to the environment. DOE Orders Mirant Power Plant to Operate Under Limited Circumstances More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan

286

Superposition and Chaining for Totally Ordered Divisible Abelian Groups  

Science Conference Proceedings (OSTI)

We present a calculus for first-order theorem proving in the presence of the axioms of totally ordered divisible abelian groups. The calculus extends previous superposition or chaining calculi for divisible torsion-free abelian groups and dense total ...

Uwe Waldmann

2001-06-01T23:59:59.000Z

287

Executive Order 13547-Stewardship of the Ocean, Our Coasts, and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47-Stewardship of the Ocean, Our Coasts, and the Great Lakes Executive Order 13547-Stewardship of the Ocean, Our Coasts, and the Great Lakes This order establishes a national...

288

Partial Type Inference with Higher-Order Types.  

E-Print Network (OSTI)

??The language MLF is an extension of System-F that permits robust first-order partial type inference with second-order polymorphism. We propose an extension of MLF's graphical (more)

HERMS, PAOLO

2009-01-01T23:59:59.000Z

289

A higher-order extension for imperative synchronous languages  

Science Conference Proceedings (OSTI)

This article presents the very first effective design of higher-order modules in the synchronous programming language Esterel. Higher-order modules, together with the robust separate compilation scheme that implements it, allow us to address a yet unexplored ...

Eric Vecchi; Jean-Pierre Talpin; Sbastien Boisgrault

2010-06-01T23:59:59.000Z

290

Event Order Abstraction for Parametric Real-Time System Verification  

E-Print Network (OSTI)

We present a new abstraction technique, event order abstraction (EOA), for parametric safety verification of real-time systems in which ``correct orderings of events'' needed for system correctness are maintained by timing ...

Umeno, Shinya

2008-07-28T23:59:59.000Z

291

Polyhedral combinatorics of a resource-constrained ordering ...  

E-Print Network (OSTI)

and ?ii = 1 for all i ? I) does not select any arcs and, as a consequence,. the left- hand side of (18) has value 0. 3. A point which does not order i0 and orders...

292

A different view on third and fourth order efficiency  

E-Print Network (OSTI)

In this paper a different approach to consider third and fourth order efficiency is suggested for non symmetric cases. Fourth order efficiency does not follow automatically but only after some adjustments are made.

Venetiaan, Shanti

2009-01-01T23:59:59.000Z

293

Fulfillment of Rush Customer Orders under Limited Capacity  

E-Print Network (OSTI)

Customer demand fulfillment is the business process within a company that determines how the customer demand is fulfilled. A rush order is the last minute customer order after the production plan of a company has been ...

Xiong, M.H.

294

On the history of fourth order metric theories of gravitation  

E-Print Network (OSTI)

We present the history of fourth order metric theories of gravitation from its beginning in 1918 until 1988.

R. Schimming; H. -J. Schmidt

2004-12-08T23:59:59.000Z

295

Energy and Eigenstate Using First Order Perturbation Theory  

E-Print Network (OSTI)

The first order estimate of energy and eigenstate of a perturbed system are found by summation over its basis.

Raghu Ramachandran; Rama Komaragiri

2009-10-30T23:59:59.000Z

296

R-Cold: Order (2013-CE-5354) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

R-Cold: Order (2013-CE-5354) R-Cold: Order (2013-CE-5354) May 1, 2013 DOE ordered R-Cold, Inc. to pay a 8,000 civil penalty after finding R-Cold had failed to certify that any...

297

Computing the Edit-Distance between Unrooted Ordered Trees  

Science Conference Proceedings (OSTI)

An ordered tree is a tree in which each node's incident edges are cyclically ordered; think of the tree as being embedded in the plane. Let A and B be two ordered trees. The edit distance between A and B is the minimum cost ...

Philip N. Klein

1998-08-01T23:59:59.000Z

298

Request that DOE rescind Order No. 202-05-03 and Order No. 202-06-01 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that DOE rescind Order No. 202-05-03 and Order No. that DOE rescind Order No. 202-05-03 and Order No. 202-06-01 Request that DOE rescind Order No. 202-05-03 and Order No. 202-06-01 Docket No. EO-05-01: On behalf of the City of Alexandria ("Alexandria"), and pursuant to Department of Energy ("DOE") Order No. 202-05-3 and Order No. 202-06-1, we respectfully request that the DOE immediately rescind its authorization for the operation of the Potomac River Generating Station ("PRGS") under the so-called Operating Plan "Option A". The PRGS is not operating pursuant to the operating configuration set out in "Option A" and its operation is in violation of Federal and Commonwealth of Virginia air quality standards. We also submit comments herein to reply to the Potomac

299

Parsons Infrastructure & Technology Group, Inc., Consent Order | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Parsons Infrastructure & Technology Group, Inc., Consent Order Parsons Infrastructure & Technology Group, Inc., Consent Order Parsons Infrastructure & Technology Group, Inc., Consent Order "The Office of Health, Safety and Security's Office of Enforcement has completed its investigation into the facts and circumstances associated with construction deficiencies at the Salt Waste Processing Facility (SWPF) located at the U.S. Department of Energy (DOE) Savannah River Site. The investigation addressed specific areas of potential noncompliance with DOE nuclear safety requirements established in 10 C.F.R. Part 830, Nuclear Safety Management." Consent Order, Parsons Infrastructure & Technology Group, Inc. - NCO-2010-02 More Documents & Publications Consent Order, Parsons Infrastructure & Technology Group, Inc. -

300

DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orders Mirant Power Plant to Operate Under Limited Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances December 20, 2005 - 11:44am Addthis DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest reasonable impact to the environment. "After weighing all of the information, I believe an emergency situation exists, and that issuance of this order is in the public interest. This order will provide the level of electricity reliability necessary to keep

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

AeroSys: Order (2011-SCE-1624) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Order (2011-SCE-1624) Order (2011-SCE-1624) AeroSys: Order (2011-SCE-1624) December 20, 2013 DOE ordered AeroSys, Inc. (AeroSys) to pay a $100,000 civil penalty after finding AeroSys had (1) failed to certify that certain models of space-constrained central air conditioners and air conditioning heat pumps comply with the applicable energy conservation standards; and (2) manufactured and distributed in commerce in the U.S. units of noncompliant models of space-constrained central air conditioners and air conditioning heat pumps. The Order adopted a Compromise Agreement, which reflects settlement terms between DOE and AeroSys. AeroSys: Order (2011-SCE-1624) More Documents & Publications AeroSys: Proposed Penalty (2011-SCE-1624) AeroSys: Order (2010-CE-01/0201 and 2010-SE-0302)

302

Hanford Waste Treatment Plant Support Task Order Modified | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Treatment Plant Support Task Order Modified Waste Treatment Plant Support Task Order Modified Hanford Waste Treatment Plant Support Task Order Modified March 11, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a modification to a task order to Aspen Resources Limited, Inc. of Boulder, Colorado for support of the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site. The modification increased the value of the task order to $1.6 million from $833,499. The task order modification has a one-year performance period and two one-year option periods. The Task Order was awarded under an Indefinite Delivery/Indefinite Quantity (ID/IQ) master Contract. Aspen Resources Limited, Inc. is a small-disadvantaged business under the Small Business Administration's

303

DOE Orders Mirant Power Plant to Operate Under Limited Circumstances |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Orders Mirant Power Plant to Operate Under Limited DOE Orders Mirant Power Plant to Operate Under Limited Circumstances DOE Orders Mirant Power Plant to Operate Under Limited Circumstances December 20, 2005 - 11:44am Addthis DOE finds emergency; determines plant will help electric reliability WASHINGTON, D.C. - Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation's Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order will help provide electric reliability for Washington, D.C., and will do so at the lowest reasonable impact to the environment. "After weighing all of the information, I believe an emergency situation exists, and that issuance of this order is in the public interest. This order will provide the level of electricity reliability necessary to keep

304

Consent Orders and Settlement Agreements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Enforcement » Consent Orders and Settlement Agreements Services » Enforcement » Consent Orders and Settlement Agreements Consent Orders and Settlement Agreements Documents Available for Download January 13, 2012 Consent Order, Battelle Energy Alliance - NCO-2012-01 Issued to Battelle Energy Alliance, LLC, related to the Reactor Coolant Draining Event at the Idaho National Laboratory Advanced Test Reactor October 13, 2011 Consent Order, URS Energy & Construction, Inc. - NCO-2011-02 Issued to URS Energy & Construction, Inc., related to Quality Improvement and Work Control Program Deficiencies associated with Construction of the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory October 6, 2011 Consent Order, CH2M-WG Idaho, LLC - WCO-2011-01 Consent Order issued to CH2M-WG Idaho, LLC related to a Hoisting Incident

305

Maxlite: Order (2010-CE-2701) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Maxlite: Order (2010-CE-2701) Maxlite: Order (2010-CE-2701) Maxlite: Order (2010-CE-2701) In the Matter of Maxlite, SK America, Inc. (general service flourescent lamps), DOE Case Number 2010-CE-2701, Adopting Order and Compromise Agreement. Order adopting accompanying Compromise Agreement. DOE found that Maxlite failed to submit compliance certifications for its products under 10 C.F.R. Section 430.62, and here assesses a civil penalty of $5,000 (if paid within 30 days) or of $10,000 (if paid between 31-60 days). Maxlite promises to certify all products sold in the US within 60 days, and agrees to a penalty of $150 per product per day over that deadline. In exchange, DOE will accept the penalty payment, issue the adopting order, and cease enforcement action. Maxlite: Order (2010-CE-2701)

306

Quantification of Order in the Lennard-Jones System  

E-Print Network (OSTI)

We conduct a numerical investigation of structural order in the shifted-force Lennard-Jones system by calculating metrics of translational and bond-orientational order along various paths in the phase diagram covering equilibrium solid, liquid, and vapor states. A series of non-equilibrium configurations generated through isochoric quenches, isothermal compressions, and energy minimizations are also considered. Simulation results are analyzed using an ordering map representation [Torquato et al., Phys. Rev. Lett. 84, 2064 (2000); Truskett et al., Phys. Rev. E 62, 993 (2000)] that assigns to both equilibrium and non-equilibrium states coordinates in an order metric plane. Our results show that bond-orientational order and translational order are not independent for simple spherically symmetric systems at equilibrium. We also demonstrate quantitatively that the Lennard-Jones and hard sphere systems sample the same configuration space at supercritical densities. Finally, we relate the structural order found in fast-quenched and minimum-energy configurations (inherent structures).

Jeffrey R. Errington; Pablo G. Debenedetti; Salvatore Torquato

2002-08-20T23:59:59.000Z

307

An extension of the relational data model to incorporate ordered domains  

Science Conference Proceedings (OSTI)

We extend the relational data model to incorporate partial orderings into data domains, which we call the ordered relational model. Within the extended model, we define the partially ordered relational algebra (the PORA) by allowing the ordering predicate ... Keywords: Axiom system, chase rules, implication problem, language expressiveness, lexicographical ordering, mixed ordering, nonuniform completeness, order-preserving database automorphism, ordered SQL, ordered functional dependencies, ordered relational model, ordered relations, partially ordered domains, partially ordered relational algebra, pointwise ordering, tableaux, valuation mapping

Wilfred Ng

2001-09-01T23:59:59.000Z

308

Executive Order 13583, Establishing a Coordinated Government-Wide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Order 13583, Establishing a Coordinated Government-Wide Executive Order 13583, Establishing a Coordinated Government-Wide Initiative to Promote Diversity and Inclusion in the Federal Workforce Executive Order 13583, Establishing a Coordinated Government-Wide Initiative to Promote Diversity and Inclusion in the Federal Workforce August 18, 2011 - 11:15am Addthis Executive Order 13583 Established a "coordinated government-wide initiative to promote diversity and inclusion in the federal workforce". Wherever possible, the Federal Government must also seek to consolidate compliance efforts established through related or overlapping statutory mandates, directions from Executive Orders, and regulatory requirements. Addthis Related Articles A Government-Wide Approach to a Diverse Workforce Executive Order 13583, Establishing a Coordinated Government-Wide Initiative to Promote Diversity and Inclusion in the Federal Workforce

309

Supplemental Comments on the Department of Energy's Emergency Order To  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on the Department of Energy's Emergency on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Supplemental Comments on the Department of Energy's Emergency Order To Resume Operation at Mirant's Potomac River Generating Station Docket No. EO-05-01: The Institute for Public Representation, on behalf of the Anacostia Riverkeeper at Earth Conservation Corps, the Patuxent Riverkeeper, and the Potomac Riverkeeper, Inc., submits the following comments pursuant to the Department of Energy's (DOE's) February 17 Order for Rehearing Emergency Order 202-05-3. District of Columbia Public Service Commission, Docket No. EO-05-01, Order No. 202-06-01 (Dep't of Energy, Feb. 17, 2006). Supplemental Comments on the Department of Energy's Emergency Order To

310

Idaho National Engineering Laboratory Consent Order, November 1, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consent Order, Consent Order, November 1, 1995 State Idaho Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Resolve LDR storage violations. Approve the modified "INEL Site Treatment Plan" Parties DOE; Idaho Department of Health and Welfare Date 11/1/1995 SCOPE * Approve the modified "INEL Site Treatment Plan." * Resolve LDR storage violations and pursuant to Section 3021(b) of RCRA through DOE agreement to the terms and conditions of the approved INEL Site Treatment Plan. ESTABLISHING MILESTONES * No specific provisions are set forth in this Order. FUNDING * No specific provisions are set forth in this Order. PENALTIES * DOE expressly recognizes that failure to comply with the terms of this Consent Order may result in an enforcement action for any relief available under the HWMA.

311

Consent Order 2005-01 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consent Order 2005-01 Consent Order 2005-01 Consent Order 2005-01 The Department of Energy (DOE) has reviewed Bechtel Hanford, Inc.'s (Bechtel Hanford) investigation and supporting documentation associated with two events occurring at the 618-2 Burial Ground in December 2004. These events resulted in significant personnel uptakes to two individuals. Bechtel Hanford reported these events using the Noncompliance Tracking System (NTS) on January 26, 2005, (NTS-RL-BHIREMACT- 2005-0001, Hazard Identification and Personnel Exposure at 618-2 Historical Burial Site). By letter dated May 24, 2005, Bechtel Hanford requested DOE consideration for a Consent Order (in lieu of an Enforcement Action) with respect to the two events. Consent Order 2005-01 More Documents & Publications Consent Order, Bechtel Hanford, Inc - EA-2005-01

312

Comments on Department of Energy's Emergency Order To Resume Limited  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Department of Energy's Emergency Order To Resume on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Docket No. EO-05-01: Riverkeeper, and the Anacostia Riverkeeper at Earth Conservation Corps, submits the following comments on the Department of Energy's December 20, 2005 Emergency Order 202-05-3 and on Mirant's proposed Compliance Plan filed pursuant to that Order. Dep't of Energy's Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in Washington, D.C., 71 Fed. Reg. 3279 (Jan. 20, 2006).

313

Surveillance Guide - OPS 9.15 Timely Orders to Operators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TIMELY ORDERS TO OPERATORS TIMELY ORDERS TO OPERATORS 1.0 Objective The objective of this surveillance is to evaluate the facility program and practices for timely orders to operators. This surveillance provides a basis for evaluating the effectiveness of the contractor's timely orders to operators program and for establishing compliance with DOE requirements. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 2.2 DOE-STD-1034-93, Guide to Good Practices for Timely Orders to Operators 3.0 Requirements Implemented This surveillance is conducted to implement the requirements of DOE 5480.19, Attachment I, Chapter XV. 4.0 Surveillance Activities The Facility Representative reviews the facility index and file of orders to operators and observes operator activities to evaluate

314

Task Order Awarded for Technical Support Services | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Order Awarded for Technical Support Services Task Order Awarded for Technical Support Services Task Order Awarded for Technical Support Services September 26, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a Task Order for Technical Services to Project Enhancement Corporation, of Germantown, MD, for technical support services at the Environmental Management 13 (EM-13) office in Washington DC. The task order was a competitive small business set-aside for time-and-materials with an approximate value of $2.7 million, with a one-year base performance period and two additional 1-year options. Services to be performed under the task order include: D&D strategic planning; D&D mission planning, evaluation, and analysis;

315

Consent Order 2005-01 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consent Order 2005-01 Consent Order 2005-01 Consent Order 2005-01 The Department of Energy (DOE) has reviewed Bechtel Hanford, Inc.'s (Bechtel Hanford) investigation and supporting documentation associated with two events occurring at the 618-2 Burial Ground in December 2004. These events resulted in significant personnel uptakes to two individuals. Bechtel Hanford reported these events using the Noncompliance Tracking System (NTS) on January 26, 2005, (NTS-RL-BHIREMACT- 2005-0001, Hazard Identification and Personnel Exposure at 618-2 Historical Burial Site). By letter dated May 24, 2005, Bechtel Hanford requested DOE consideration for a Consent Order (in lieu of an Enforcement Action) with respect to the two events. Consent Order 2005-01 More Documents & Publications Consent Order, Bechtel Hanford, Inc - EA-2005-01

316

ARM - Engineering Work Request & Engineering Work Order Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Request & Engineering Work Request & Engineering Work Order Guidelines Page Contents: Introduction Discussion of the ARM Climate Research Facility Engineering Process: The Engineering Change Request (ECR) and the Engineering Change Order (ECO) Operations and Engineering Task Consulting: The Engineering Work Request (EWR) and the Engineering Work Order (EWO) Relationship of the ECR/ECO and EWR/EWO to the Engineering Task Tracking Tool Relationship of the ECR/ECO and EWR/EWO to the Existing Configuration Control Process in the ARM Climate Research Facility(PIF/CAR, PRR, ORR, and BCR) Glossary Frequently Asked Questions (PDF, 173K) Engineering Work Request & Engineering Work Order Guidelines Process Guidelines for the Engineering Change Request/Engineering Change Order and Engineering Work Request/Engineering Work Order

317

Domain growth and ordering kinetics in dense quark matter  

Science Conference Proceedings (OSTI)

The kinetics of chiral transitions in quark matter is studied in a two-flavor Nambu-Jona-Lasinio model. We focus on the phase-ordering dynamics subsequent to a temperature quench from the massless quark phase to the massive quark phase. We study the dynamics by considering a phenomenological model (Ginzburg-Landau free-energy functional). The morphology of the ordering system is characterized by the scaling of the order-parameter correlation function.

Singh, A.; Puri, S. [Jawaharlal Nehru University, School of Physical Sciences (India); Mishra, H., E-mail: hm@prl.res.in [Physical Research Laboratory, Theory Division (India)

2012-06-15T23:59:59.000Z

318

Transformation Formula of the "2nd" Order Mock Theta Function  

E-Print Network (OSTI)

We give a transformation formula for the ``2nd order'' mock theta function which was recently proposed in connection with the quantum invariant for the Seifert manifold.

Kazuhiro Hikami

2006-04-04T23:59:59.000Z

319

Prediction of quantum stripe ordering in optical lattices  

E-Print Network (OSTI)

We predict the robust existence of a novel quantum orbital stripe order in the $p$-band Bose-Hubbard model of two-dimensional triangular optical lattices with cold bosonic atoms. An orbital angular momentum moment is formed on each site exhibiting a stripe order both in the superfluid and Mott-insulating phases. The stripe order spontaneously breaks time-reversal, lattice translation and rotation symmetries. In addition, it induces staggered plaquette bond currents in the superfluid phase. Possible signatures of this stripe order in the time of flight experiment are discussed.

Congjun Wu; W. Vincent Liu; Joel Moore; Sankar Das Sarma

2006-06-29T23:59:59.000Z

320

A static cost analysis for a higher-order language.  

E-Print Network (OSTI)

?? We develop a static complexity analysis for a higher-order functional language with structural list recursion. The complexity of an expression is a pair consisting (more)

Danner, Norman

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Executive Order 13148-Greening the Government Through Leadership in  

NLE Websites -- All DOE Office Websites (Extended Search)

48-Greening the Government Through Leadership 48-Greening the Government Through Leadership in Environmental Management Executive Order 13148-Greening the Government Through Leadership in Environmental Management The head of each Federal agency is responsible for ensuring that all necessary actions are taken to integrate environmental accountability into agency day-to-day decisionmaking and long-term planning processes, across all agency missions, activities, and functions. Executive Order 13148-Greening the Government Through Leadership in Environmental Management More Documents & Publications Executive Order 12969-Federal Acquisition and Community RightTo-Know Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000

322

DOE Awards Task Order Modification for Support Services to Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modification for Support Services to Office of Environmental Management DOE Awards Task Order Modification for Support Services to Office of Environmental Management March 11, 2013...

323

DOE Awards Small Business Task Order for Technical Support to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and government-sponsored nuclear energy research. Addthis Related Articles DOE Awards Support Service Contract DOE Awards Small Business Task Order for Technical Support to...

324

Executive Order 13148, Greening the Government Through Leadership...  

NLE Websites -- All DOE Office Websites (Extended Search)

Order (EO) 13148, Greening the Government Through Leadership in Environmental Management. The report was prepared in accordance with the guidance provided in your letter to...

325

EETD Sustainability -- Keeping our own house in order  

NLE Websites -- All DOE Office Websites (Extended Search)

EETD Sustainability -- Keeping our own house in order NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be updated until...

326

Comments on Department of Energy's Emergency Order To Resume...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Comments on Department of...

327

Partially affine control problems: second order conditions and a well ...  

E-Print Network (OSTI)

Oct 17, 2011 ... Partially affine control problems: second order conditions and a well-posed shooting algorithm. M. Soledad Aronna(aronna ***at***...

328

PRINT, WEB, AND e-NEWS ADVERTISING INSERTION ORDER  

Science Conference Proceedings (OSTI)

PRINT, WEB, AND e-NEWS. ADVERTISING INSERTION ORDER. FAX. Fax this form to: TMS Advertising Sales. Fax: (724) 814-3141. MAIL. Mail this form to:.

329

Executive Order 13031-Federal Alternative Fueled Vehicle Leadership...  

NLE Websites -- All DOE Office Websites (Extended Search)

in the use of alternative fueled vehicles (AFVs). Executive Order 13031-Federal Alternative Fueled Vehicle Leadership More Documents & Publications NATIONAL DEFENSE...

330

Effects of Long Range Ordering, Temperature and Strain Rate on ...  

Science Conference Proceedings (OSTI)

available at below 700C and the quantitative chemical analysis of the ordered phase would be very difficult or .... Therefore the alternative scenario can be. 692 ...

331

First and second order optimality conditions for optimal control ...  

E-Print Network (OSTI)

May 16, 2012 ... Abstract: This paper deals with optimal control problems of integral equations, with initial-final and running state constraints. The order of a...

332

The synthesis and characterization of porous, conductive, and ordered materials  

E-Print Network (OSTI)

Two different classes of polymers were pursued as candidates for materials possessing porosity, conductivity, and crystalline order. Attempts were made with hexaazatrinaphthylene- and dibenzotetrathiafulvalene-based ...

Narayan, Tarun Chandru

2013-01-01T23:59:59.000Z

333

On the Fluctuations that Order and Frustrate Liquid Water  

E-Print Network (OSTI)

Quantitative water model . . . . . . . . . . . . . . . .5.3 Determining T g for water . . . . . . . . . . . . . . .iv Contents 6 Frustrating water at ordered surfaces 6.1

Limmer, David

2013-01-01T23:59:59.000Z

334

Executive Order 13514-Federal Leadership in Environmental, Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

514-Federal Leadership in Environmental, Energy, and Economic Performance Executive Order 13514-Federal Leadership in Environmental, Energy, and Economic Performance It is...

335

Package Equivalent Reactor Networks as Reduced Order Models for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Package Equivalent Reactor Networks as Reduced Order Models for Use with CAPE-Open Compliant Simulations Description The Department of Energy's (DOE) National Energy Technology...

336

American Standard: Order (2013-CW-3001) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

had failed to certify that certain models of water closets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

337

Altmans: Order (2010-CW-1402) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

had failed to certify that certain models of showerheads comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

338

Penguin Toilets: Order (2010-CW-1615) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

had failed to certify that certain models of water closets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

339

Artisan Manufacturing: Order (2010-CW-0712) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

had failed to certify that certain models of faucets comply with the applicable water conservation standard. The Order adopted a Compromise Agreement, which reflected...

340

Amerisink: Order (2010-CW-0710) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amerisink had failed to certify that certain models of faucets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Averen: Order (2010-CW-0711) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Averen had failed to certify that certain models of faucets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

342

American Valve: Order (2010-CW-1411) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valve had failed to certify that certain showerhead models comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

343

Allen Co: Order (2010-CW-0715) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Allen Co. had failed to certify that certain models of faucets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

344

Zoe Industries: Order (2010-CW-1405) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zoe had failed to certify that certain models of showerheads comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

345

Afeel: Order (2010-CW-07/1414) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to certify that certain models of showerheads and faucets comply with the applicable water conservation standards. The Order adopted a Compromise Agreement, which reflected...

346

Hydac: Order (2012-SE-4107) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

after finding Hydac had manufactured and distributed in commerce in the U.S. noncompliant electric motors. The Order adopted a Compromise Agreement, which reflected settlement...

347

Di erentiable Exact Penalty Functions for Nonlinear Second-Order ...  

E-Print Network (OSTI)

Masao Fukushima. September 6, 2012. Abstract. We propose a method to solve nonlinear second-order cone programs (SOCPs), based on a continuously...

348

Dade Engineering: Order (2013-CE-5316) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

certain models of walk-in cooler and freezer (WICF) components comply with the applicable energy conservation standards. The Order adopted a Compromise Agreement, which reflected...

349

Exploiting Second-Order Cone Structure for Global Optimization  

E-Print Network (OSTI)

Oct 28, 2010 ... Comparing our method to general-purpose solvers, we observe several orders of magnitude improvement in performance. Keywords: Global...

350

First and second order optimality conditions for optimal control ...  

E-Print Network (OSTI)

but not qualified because (i) does not hold, then there exists a singular. Langrange multiplier of the form (0, ?E, 0). One can see that second-. order necessary...

351

A FIRST-ORDER AUGMENTED LAGRANGIAN METHOD FOR ...  

E-Print Network (OSTI)

In this paper we propose a new first-order augmented Lagrangian algorithm to solve the basis pursuit .... Moreover, the sequence of NESTA iterates does.

352

The Role of Protective Orders in Intellectual Property Litigation  

Science Conference Proceedings (OSTI)

In general, a protective order is an agreement between or among the parties providing details for identification of information that is deemed confidential by one...

353

RATE ANALYSIS OF INEXACT DUAL FIRST ORDER METHODS ...  

E-Print Network (OSTI)

The dual problem is solved by inexact first order methods based on ..... only approximately and shows that algorithm (IDG) does not accumulate errors. However...

354

First-Order Methods of Smooth Convex Optimization with Inexact ...  

E-Print Network (OSTI)

Abstract We introduce the notion of inexact first-order oracle and analyze ..... Note that parameter ? does not represent an actual accuracy: it can be.

355

Optimization Online - Mixed Integer Second-Order Cone ...  

E-Print Network (OSTI)

Jun 25, 2013 ... Mixed Integer Second-Order Cone Programming Formulations for ... the method does not always provide the best subset of explanatory...

356

An acceleration procedure for optimal first-order methods  

E-Print Network (OSTI)

Jul 16, 2012 ... three orders of magnitude for the largest problems we considered. Keywords: Convex ... the inequality does not hold. This strategy yielded a...

357

A FIRST-ORDER SMOOTHED PENALTY METHOD FOR ...  

E-Print Network (OSTI)

In this paper we design a new first-order penalty-based algorithm for solving the ...... SPA does not require projections and computes a Nesterov update in.

358

DOE Order 451.1B: NEPA Compliance Program  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of this Order is to establish DOE internal requirements and responsibilities for implementing the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality...

359

Office of Enforcement - Consent Orders and Settlement Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Consent Order issued to Battelle Energy Alliance, LLC, related to the Reactor Coolant Draining Event at the Idaho National Laboratory Advanced Test Reactor,...

360

Notice of Emergency Action - Emergency Order To Resume Limited...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Emergency Action - Emergency Order To Resume Limited Operation at the Potomac River Generating Station, Alexandria, VA, in Response to Electricity Reliability Concerns in...

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

On the order of magnitude of 8th order corrections to the anomalous magnetic moment of the muon  

E-Print Network (OSTI)

It is shown that the 8th order contribution to the muon anomaly can be as large as 100-200*( alpha / pi )/sup 4/. (10 refs).

Lautrup, B

1972-01-01T23:59:59.000Z

362

Nodal high-order methods on unstructured grids  

Science Conference Proceedings (OSTI)

We present a convergent high-order accurate scheme for the solution of linear conservation laws in geometrically complex domains. As our main example we include a detailed development and analysis of a scheme for the time-domain solution of Maxwell's ... Keywords: Maxwell's equations, convergence, high-order accuracy, linear conservation laws, spectral methods, stability, unstructured grids

J. S. Hesthaven; T. Warburton

2002-09-01T23:59:59.000Z

363

A second-order pruning step for verified global optimization  

Science Conference Proceedings (OSTI)

We consider pruning steps used in a branch-and-bound algorithm for verified global optimization. A first-order pruning step was given by Ratz using automatic computation of a first-order slope tuple (Ratz, Automatic Slope Computation and its Application ... Keywords: 65G20, 65K05, 90C56, Global optimization, Interval analysis, Pruning step

Marco Schnurr

2009-07-01T23:59:59.000Z

364

A uniformly second order fast sweeping method for eikonal equations  

Science Conference Proceedings (OSTI)

A uniformly second order method with a local solver based on the piecewise linear discontinuous Galerkin formulation is introduced to solve the eikonal equation with Dirichlet boundary conditions. The method utilizes an interesting phenomenon, referred ... Keywords: Discontinuous Galerkin method, Eikonal equations, Fast sweeping method, Superconvergence, Uniformly second order

Songting Luo

2013-05-01T23:59:59.000Z

365

Nuclear parton distributions at next to leading order  

E-Print Network (OSTI)

We perform a next to leading order QCD global analysis of nuclear deep inelastic scattering and Drell-Yan data using the convolution approach to parameterize nuclear parton densities. We find both a significant improvement in the agreement with data compared to previous extractions, and substantial differences in the scale dependence of nuclear effects compared to leading order analyses.

D. de Florian; R. Sassot

2003-11-18T23:59:59.000Z

366

Introspective pushdown analysis of higher-order programs  

Science Conference Proceedings (OSTI)

In the static analysis of functional programs, pushdown flow analysis and abstract garbage collection skirt just inside the boundaries of soundness and decidability. Alone, each method reduces analysis times and boosts precision by orders of magnitude. ... Keywords: abstract garbage collection, abstract interpretation, abstract machines, cfa2, higher-order languages, program analysis, pushdown analysis, pushdown systems

Christopher Earl; Ilya Sergey; Matthew Might; David Van Horn

2012-10-01T23:59:59.000Z

367

Indonesia's Ascent: Power, Leadership and Asia's Security Order  

E-Print Network (OSTI)

Indonesia's Ascent: Power, Leadership and Asia's Security Order Canberra Conference and Workshop across Australia and the broader region #12;Indonesia's Ascent: Power, Leadership and Asia's Security Order Project Abstract As Indonesia's economy grows, it is increasingly being referred to as a rising

368

An Ordering of Terms Based on Semantic Relatedness  

E-Print Network (OSTI)

An Ordering of Terms Based on Semantic Relatedness Abstract Term selection methods typically employ a statistical measure to filter or weight terms. Term expansion for IR may also depend on statistics, or use of terms based on a seman- tic relatedness measure. This semantic order can be exploited by term weighting

Tan, Chew Lim

369

Hydrogen Storage on Metal-Doped Ordered Mesoporous Carbons  

E-Print Network (OSTI)

Hydrogen Storage on Metal-Doped Ordered Mesoporous Carbons Shuguang Deng New Mexico State Meeting, May 18, 2010 #12;Outline · Research group · Hydrogen storage: background and status · Synthesis Adsorption in Ordered Mesoporous Carbon through Clathrate Formation" Int. J. Hydrogen Energy, 34, 8583

Nishiguchi, Michele

370

Molecular dynamics simulations of ordered alkane chains physisorbed on graphite  

E-Print Network (OSTI)

Molecular dynamics simulations of ordered alkane chains physisorbed on graphite Reinhard Hentschke molecular axes oriented parallel to the substrate. Here we employ molecular dynamics (MD) simulations to obtain more details on the molecular order and dynamics within the alkane lamellae as a function

Peters, Achim

371

On elements of prime order in Cr_2(Q)  

E-Print Network (OSTI)

We show that the plane Cremona group over the field of rational numbers does not contain elements of prime order $\\ge 11$. Also we prove that there is only one conjugacy class of elements of order 7 represented by an automorphism of a 2-dimensional torus constructed by J.-P. Serre.

Dolgachev, Igor V

2007-01-01T23:59:59.000Z

372

An efficient net ordering algorithm for buffer insertion  

Science Conference Proceedings (OSTI)

There are efficient algorithms for net-based buffer insertion but they lead to sub-optimal path delays or unnecessarily large number of buffers due to their lack of global view. This can increase power consumption as well as die area. The ordering of ... Keywords: buffer insertion, buffer usage, net ordering

Hamid Reza Kheirabadi; Morteza Saheb Zamani

2007-03-01T23:59:59.000Z

373

Energy Department Awards First Major Task Order Under Streamlined  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Major Task Order Under Streamlined First Major Task Order Under Streamlined Contracting System Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up WASHINGTON, DC - The Department of Energy (DOE) has awarded a Task Order for an estimated $19.4 million to LATA-SHARP Remediation Services, LLC for the completion of clean-up activities at the Ashtabula Closure Project (ACP) in Ashtabula, Ohio. This is the first major Task Order that has been issued under the Office of Environmental Management's Nationwide Indefinite Delivery, Indefinite Quantity (ID/IQ) Multiple Award Contract, which pre-qualifies companies to do work for DOE's EM program. Assistant Secretary for Environmental Management James Rispoli said. "We

374

LFRG DOE Order 435.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LFRG DOE Order 435.1 LFRG DOE Order 435.1 LFRG DOE Order 435.1 Chapter 4 of the DOE Manual on Order 435.1, Low-level Waste Requirements, addresses the procedures whereby Department of Energy LLW Disposal Facilities will operated and maintained. Section P and Section Q describe the Performance Assessment and Composite Analysis documents that each DOE disposal facility will submit to the LFRG. To view the entire DOE Order, Manual, and Implementation Guidance documents, choose the link below to get to the main DOE Directives portal and follow the search requirements. DOE Directives, Regulations, and Standards Portal Note - For DOE O 435.1 Chg 1 (08-28-01), please use the above link and follow the search option to locate this document. P. Disposal. Low-level waste disposal facilities shall meet the following

375

DOE Awards Research and Systems Engineering Task Order | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research and Systems Engineering Task Order Research and Systems Engineering Task Order DOE Awards Research and Systems Engineering Task Order March 28, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a task order to The MITRE Corporation, of McLean Virginia. MITRE will provide research and development in support of DOE's Office of Environmental Management. The task order has an approximate value of $5.9 million, with an 18-month performance period, with nine-month base period and a nine-month option. The MITRE Corporation is a not-for-profit organization chartered to work for the interest of the public. MITRE manages the Internal Revenue Service Federally Funded Research and Development Center (FFRDC) Master Indefinite

376

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 July 12, 2007 Issued to Los Alamos National Security, LLC related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory The Compliance Order directs LANS to implement specific corrective actions to remediate both the laboratory management deficiencies that contributed to the thumb drive security incident at Los Alamos National Laboratory (LANL) discovered in October 2006 and, more broadly, longstanding deficiencies in the classified information and cyber security programs at LANL. Violation of the Compliance Order would subject LANS to issuance of a notice of violation and assessment of civil penalties up to S100,000 per

377

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 Compliance Order, Los Alamos National Security, LLC - July 12, 2007 July 12, 2007 Issued to Los Alamos National Security, LLC related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory The Compliance Order directs LANS to implement specific corrective actions to remediate both the laboratory management deficiencies that contributed to the thumb drive security incident at Los Alamos National Laboratory (LANL) discovered in October 2006 and, more broadly, longstanding deficiencies in the classified information and cyber security programs at LANL. Violation of the Compliance Order would subject LANS to issuance of a notice of violation and assessment of civil penalties up to S100,000 per

378

Mound Plant Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 EM Home | Regulatory Compliance | Environmental Compliance Agreements Mound Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Mound Facility : Findings and Order P.O. Box 66 : Miamisburg, Ohio 45343-0066 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification

379

Executive Order 13175-Consultation and Coordination With Indian Tribal  

NLE Websites -- All DOE Office Websites (Extended Search)

75-Consultation and Coordination With Indian 75-Consultation and Coordination With Indian Tribal Governments Executive Order 13175-Consultation and Coordination With Indian Tribal Governments By the authority vested in me as President by the Constitution and the laws of the United States of America, and in order to establish regular and meaningful consultation and collaboration with tribal officials in the development of Federal policies that have tribal implications, to strengthen the United States government-to-government relationships with Indian tribes, and to reduce the imposition of unfunded mandates upon Indian tribes; it is hereby ordered as follows: Executive Order 13175-Consultation and Coordination With Indian Tribal Governments More Documents & Publications Executive Order 13175: Consultation and Coordination with Indian Tribal

380

Oak Ridge Reservation Compliance Order, September 26, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reservation Compliance Order, September 26, 1995 Page 1 of 5 Reservation Compliance Order, September 26, 1995 Page 1 of 5 EM Home | Regulatory Compliance | Environmental Compliance Agreements Oak Ridge Reservation Compliance Order, September 26, 1995 STATE OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION IN THE MATTER OF: ) ) ) DIVISION OF SOLID WASTE UNITED STATES DEPARTMENT OF ) MANAGEMENT ENERGY ) ) CASE NO. 95-0514 RESPONDENT ) Commissioner's Order NOW COMES Don Dills, Commissioner of the Department of Environment and Conservation, and states that: Table of Contents Parties Jurisdiction Facts Order Reservation of Rights Notice of Rights Parties I. Don Dills is the duly appointed Commissioner of the Tennessee Department of Environment and Conservation ("the Department"). II. The United States Department of Energy ("DOE")is a department, agency and instrumentality of the

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Executive Order 13212: 66 FR 28357 (22 May 2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Order 13212: 66 FR 28357 (22 May 2001) Executive Order 13212: 66 FR 28357 (22 May 2001) Executive Order 13212--Actions To Expedite Energy-Related Projects May 18, 2001 By the authority vested in me as President by the Constitution and the laws of the United States of America, and in order to take additional steps to expedite the increased supply and availability of energy to our Nation, it is hereby ordered as follows: Section 1. Policy. The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people. In general, it is the policy of this Administration that executive departments and agencies (agencies) shall take appropriate actions, to the extent consistent with applicable law, to expedite projects that will increase the

382

Commonwealth of Virginia, State Air Pollution Control Board, Order by  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commonwealth of Virginia, State Air Pollution Control Board, Order Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Commonwealth of Virginia, State Air Pollution Control Board, Order by Concent Issued to Mirant Potomac River, LLC, Registration No. 70228 Docket No. EO-05-01: This is a Consent Order issued under the authority of Va. Code § § 10.1-1307D and 10.1-1307.1, between the Board and Mirant Potomac River, LLC for the purpose of ensuring compliance with ambient air quality standards incorporated at 9 VAC Chapter 30 and Va, Code § 10.1-1307.3(3) requiring certain emissions modeling and analysis related to the Potomac River Power Station located in Alexandria, Virginia, Commonwealth of Virginia, State Air Pollution Control Board, Order by

383

Executive Orders Defining Tribal Relationships | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Orders Defining Tribal Relationships Executive Orders Defining Tribal Relationships Executive Orders Defining Tribal Relationships Executive Order 13592 Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011). Superseded EO 13021 to ensure that all American Indian students, regardless of which institution they attend, receive support from the federal government at elementary through college levels. This EO also creates an Interagency Working Group on AI/AN Education to establish educational goals across the government. Executive Order 13096 American Indian and Alaska Education (1998). Directs federal agencies to improve the academic performance of American Indian and Alaska Native students via six goals: (1) improving reading and mathematics (2) increasing high school completion

384

Effective March 26, 2012, "Order History" in Marketplace will be replaced with "Order Query" a faster, easier way to lookup past order information.  

E-Print Network (OSTI)

Orders or Invoices. 2. What are you searching for? Enter key terms like Requisition/PO Numbers criteria entered. Filter query criteria after search is performed. In addition to the extensive Advanced, a Supplier name or a Catalog number Hint: Click "Query" for a complete list of available search terms. 3

California at San Diego, University of

385

SU(N) group-theory constraints on color-ordered five-point amplitudes at all loop orders  

E-Print Network (OSTI)

Color-ordered amplitudes for the scattering of n particles in the adjoint representation of SU(N) gauge theory satisfy constraints arising solely from group theory. We derive these constraints for n=5 at all loop orders using an iterative approach. These constraints generalize well-known tree-level and one-loop group theory relations.

Alexander C. Edison; Stephen G. Naculich

2011-11-16T23:59:59.000Z

386

SU(N) group-theory constraints on color-ordered five-point amplitudes at all loop orders  

E-Print Network (OSTI)

Color-ordered amplitudes for the scattering of n particles in the adjoint representation of SU(N) gauge theory satisfy constraints arising solely from group theory. We derive these constraints for n=5 at all loop orders using an iterative approach. These constraints generalize well-known tree-level and one-loop group theory relations.

Edison, Alexander C

2011-01-01T23:59:59.000Z

387

Division, NN-43, Office of Arms Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 10 CFR Ch. III (1-1-10 Edition) § 810.14 Division, NN-43, Office of Arms Control and Nonproliferation. [51 FR 44574, Dec. 10, 1986, as amended at 58 FR 39639, July 16, 1993; 65 FR 16128, Mar. 27, 2000] § 810.14 Additional information. The Department of Energy may at any time require a person engaging in any generally or specifically author- ized activity to submit additional in- formation. § 810.15 Violations. (a) The Atomic Energy Act provides that: (1) Permanent or temporary injunc- tions or restraining orders may be granted to prevent any person from violating any provision of the Atomic Energy Act or its implementing regula- tions. (2) Any person convicted of violating or conspiring or attempting to violate any provision of section 57 of the

388

Nevada Test Site FFCA Consent Order, March 27, 1996 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Test Site Federal Facility Compliance Act Test Site Federal Facility Compliance Act Consent Order, March 27, 1996 State Nevada Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Enforce the STP and establish procedures for reviewing schedules, deleting waste streams, and administrative procedures Parties DOE; Nevada Division of Environmental Protection Date 3/27/1996 SCOPE * Require DOE to achieve compliance with the requirements of the FFCAct through the STP which contains schedules and applicable strategies for achieving compliance with the applicable LDR standards. * Establish procedures for reviewing schedules, deleting waste streams, and administrative procedures. * Establish enforceable schedules and milestones applicable to this Order. ESTABLISHING MILESTONES *

389

Executive Order 13423- Strengthening Federal Environmental, Energy, and  

NLE Websites -- All DOE Office Websites (Extended Search)

423- Strengthening Federal Environmental, 423- Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It is the policy of the United States that Federal agencies conduct their environmental, transportation, and energy-related activities under the law in support of their respective missions in an environmentally, economically and fiscally sound, integrated, continuously improving, efficient, and sustainable manner. Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management More Documents & Publications Executive Order 13514-Federal Leadership in Environmental, Energy, and Economic Performance EPAct 2005. Conference Report, July 27, 2005 In the Senate of the United States,June 28, 2005.

390

Executive Order 13175: Consultation and Coordination with Indian Tribal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

175: Consultation and Coordination with Indian 175: Consultation and Coordination with Indian Tribal Governments (2000) Executive Order 13175: Consultation and Coordination with Indian Tribal Governments (2000) Executive Order 13175: Consultation and Coordination with Indian Tribal Governments (2000). Establishes standards for regular and meaningful consultation with Tribal officials to strengthen the government-to-government relationships with Indian tribes, including establishment of fundamental principles, policymaking criteria, special requirements of legislative proposals, consultation, accountability principles, and increasing flexibility for Indian Tribal Waivers. EO 13175 supersedes EO 13084. Executive Order 13175: Consultation and Coordination with Indian Tribal Governments (2000) More Documents & Publications

391

General Order Ensuring Reliable Electric Service (Louisiana) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Order Ensuring Reliable Electric Service (Louisiana) General Order Ensuring Reliable Electric Service (Louisiana) General Order Ensuring Reliable Electric Service (Louisiana) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Louisiana Program Type Safety and Operational Guidelines Provider Louisiana Public Service Commission The standards set forth herein have been developed to provide consumers, the Louisiana Public Service Commission, and jurisdictional electric utilities with a uniform method of ensuring reliable electric service. The standards shall be applicable to the distribution systems of all electric utilities under the jurisdiction of the Louisiana Public Service

392

High order ZIP' differencing of convective terms. Memorandum report  

Science Conference Proceedings (OSTI)

The ZIP flux form for differencing the term (wv) sub x, where w is a convected quantity and v is a convective velocity, is observed to be equivalent to differencing the alternative expression wv sub x + w sub x v using centered second order finite differences. Based on this observation, the extension of the ZIP flux concept to arbitrarily high order accuracy is given. Computational examples show the advantage both of the ZIP flux concept itself and of its higher order forms within the context of flux-corrected transport (FCT) algorithms.

Zalesak, S.T.

1980-05-08T23:59:59.000Z

393

Executive Order 13212 - Actions To Expedite Energy-Related Projects:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Order 13212 - Actions To Expedite Energy-Related Executive Order 13212 - Actions To Expedite Energy-Related Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 Executive Order 13212 - Actions To Expedite Energy-Related Projects: Federal Register Notice Volume 66, No. 99 - May 18, 2001 The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people. In general, it is the policy of this Administration that executive departments and agencies (agencies) shall take appropriate actions, to the extent consistent with applicable law, to expedite projects that will increase the production, transmission, or conservation of energy. Executive Order 13212: 66 FR 28357 (22 May 2001) More Documents & Publications

394

Task Order Awarded for Environmental Technical Services | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Technical Services Environmental Technical Services Task Order Awarded for Environmental Technical Services January 16, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a task order for environmental technical services to Professional Project Services, Inc., of Oak Ridge, TN, for support services at the Paducah Gaseous Diffusion Plant located near Paducah, KY. The task order was a competitive small business set-aside for time-and-materials with an approximate value of $22.5 million, with a three-year performance period and two additional 1-year options. Services to be performed under the task order include: Project Controls & Baseline Support Quality Assurance Regulatory Compliance

395

Order Module--NNSA OCCUPATIONAL RADIATION PROTECTION | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order Module--NNSA OCCUPATIONAL RADIATION PROTECTION Order Module--NNSA OCCUPATIONAL RADIATION PROTECTION Order Module--NNSA OCCUPATIONAL RADIATION PROTECTION The familiar level of this module is designed to provide the basic information to meet the requirements that are related to 10 CFR 835, "Occupational Radiation Protection," in the following DOE Functional Area Qualification Standards: DOE-STD-1177-2004, Emergency Management DOE-STD-1151-2002, Facility Representative DOE-STD-1146-2007, General Technical Base DOE-STD-1138-2007, Industrial Hygiene DOE-STD-1183-2007, Nuclear Safety Specialist DOE-STD-1174-2003, Radiation Protection DOE-STD-1175-2006, Senior Technical Safety Manager DOE-STD-1178-2004, Technical Program Manager DOE-STD-1155-2002, Transportation and Traffic Management DOE Order Self Study Modules - 10 CFR 835 Occupational Radiation Protection

396

Implementation of Executive Order 12114 Environmental Effects Abroad of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of Executive Order 12114 Environmental Effects Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979. G-DOE-effects_abroad.pdf More Documents & Publications Environmental Effects Abroad of Major Federal Actions EO 12114: Environmental Effects Abroad of Major Federal Actions EIS-0386: Notice of Intent to Prepare a Programmatic Environmental Impact Statement, Amend Relevant Agency Land Use Plans, and Conduct Public Scoping Meetings, and Notice of Floodplain and Wetlands Involvement

397

ORDER NO. 3357: Freeport LNG | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORDER NO. 3357: Freeport LNG ORDER NO. 3357: Freeport LNG ORDER NO. 3357: Freeport LNG ORDER CONDITIONALLY GRANTING LONG-TERM MULTI-CONTRACT AUTHORIZATION TO EXPORT LIQUEFIED NATURAL GAS BY VESSEL FROM THE FREEPORT LNG TERMINAL ON QUINTANA ISLAND, TEXAS TO NON-FREE TRADE AGREEMENT NATIONS Based on a review of the complete record and for the reasons set forth below, DOE/FE has concluded that the opponents of the FLEX Application have not demonstrated that the requested authorization will be inconsistent with the public interest and finds that the exports proposed in this Application are likely to yield net economic benefits to the United States. DOE/FE further finds that FLEX's proposed exports on behalf of other entities should be conditionally authorized at a volumetric rate not to exceed the

398

FY 2006 Executive Order 13101 Report: Department of Energy Affirmative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 2006 Executive Order 13101 Report: Department of Energy FY 2006 Executive Order 13101 Report: Department of Energy Affirmative Procurement and Recycling Fiscal Year 2006 Report, 3/12/07 FY 2006 Executive Order 13101 Report: Department of Energy Affirmative Procurement and Recycling Fiscal Year 2006 Report, 3/12/07 The Department of Energy (DOE) is pleased to transmit the enclosed report in fulfillment of the annual reporting requirements under Executive Order 13101, Greening the Government through Waste Prevention, Recycling, and Federal Acquisition. The report was prepared in accordance with the survey instructions provided in your letter to Agency Environmental Executives and Senior Procurement Executives, dated November 2, 2006. DOE's report contains the specific purchasing data that you requested on the eight (8)

399

A new type of second order cosmological lagrangians  

E-Print Network (OSTI)

We investigate a possible connection between Galileon gravity and teleparallel gravity. We also propose a new type of second order cosmological lagrangian and study a some of its properties.

P. Tretyakov

2013-02-26T23:59:59.000Z

400

A maximum likelihood approach towards aggregating partial orders  

Science Conference Proceedings (OSTI)

In many of the possible applications as well as the theoretical models of computational social choice, the agents' preferences are represented as partial orders. In this paper, we extend the maximum likelihood approach for defining "optimal" voting rules ...

Lirong Xia; Vincent Conitzer

2011-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

West Valley Demonstration Project Administrative Consent Order, August 27, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 EM Home | Regulatory Compliance | Environmental Compliance Agreements West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION AND THE UNITED STATES DEPARTMENT OF ENERGY EPA ID NUMBER NYD980779540 In the Matter of | | UNITED STATES | ORDER DEPARTMENT OF ENERGY, | Docket No. __________ | RESPONDENT | ___________________________| Table of Contents Parties Jurisdiction Purpose and Scope Statement of Facts & Conclusions of Law I. Implementation of the STP II Annual Updates III. Establishing Milestones and Planning Schedule Activity IV. Covered Matters V. Inclusion of New Waste Streams VI. Amendments VII. Project Managers

402

Implementation of Executive Order 12114 Environmental Effects Abroad of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of Executive Order 12114 Environmental Effects Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline Implementation of Executive Order 12114 Environmental Effects Abroad of Major Federal Actions: Final Guideline The Department of Energy hereby adopts final Departmental guidelines implementing Executive Order 12114-Environmental Effecrs Abroad of Major Federal Actions, whic was issued on January 4, 1979. G-DOE-effects_abroad.pdf More Documents & Publications Environmental Effects Abroad of Major Federal Actions EIS-0386: Notice of Intent to Prepare a Programmatic Environmental Impact Statement, Amend Relevant Agency Land Use Plans, and Conduct Public Scoping Meetings, and Notice of Floodplain and Wetlands Involvement EIS-0481: Notice of Intent to Prepare a Programmatic Environmental Impact

403

The Nanoscale-Ordered Materials Diffractometer at SNS  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanoscale-Ordered Materials Diffractometer Nanoscale-Ordered Materials Diffractometer Inside the NOMAD detector tank. Inside the NOMAD detector tank. NOMAD is a high-flux, medium-resolution diffractometer that uses a large bandwidth of neutron energies and extensive detector coverage to carry out structural determinations of local order in crystalline and amorphous materials. It enables studies of a large variety of samples ranging from liquids, solutions, glasses, polymers, and nanocrystalline materials to long-range-ordered crystals. The enhanced neutron flux at SNS, coupled with the advanced neutron optics and detector features of NOMAD, allows for unprecedented access to high-resolution pair distribution functions, small-contrast isotope substitution experiments, small sample sizes, and parametric studies.

404

Manhattan Project: Order to Drop the Atomic Bomb  

Office of Scientific and Technical Information (OSTI)

ORDER TO DROP THE ATOMIC BOMB Handy to Spaatz, National Archives (July 25, 1945) Resources > Library The document below is the order to attack Japanese cities with atomic bombs. In it, the Acting Army Chief of Staff, Thomas Handy, orders Commanding General Carl Spaatz, Army Strategic Air Forces, to "deliver [the] first special bomb as soon as weather will permit . . . after about 3 August 1945." The target list: "Hiroshima, Kokura, Niigata, and Nagasaki." Further attacks were also authorized: "additional bombs will be delivered on the above targets as soon as made ready." Handy was the acting chief of staff because George Marshall was with President Harry S. Truman at the Potsdam Conference. The letter explicitly notes that this order was approved by Marshall and Secretary of War Henry Stimson. Truman, of course, provided the ultimate authorization for dropping the bomb.

405

An Accuracy Progressive Sixth-Order Finite-Difference Scheme  

Science Conference Proceedings (OSTI)

How to reduce the computational error is a key issue in numerical modeling and simulation. The higher the order of the difference scheme, the less the truncation error and the more complicated the computation. For compromise, a simple, three-...

Peter C. Chu; Chenwu Fan

2001-07-01T23:59:59.000Z

406

CARB Executive Order Exemption Process for a Hydrogen-fueled...  

NLE Websites -- All DOE Office Websites (Extended Search)

A Roush Correspondence with CARB 7 Appendix A Roush Correspondence with CARB 8 9 10 11 12 13 14 15 16 17 18 19 20 Appendix B CARB Executive Order A-006-1340 21 Appendix B CARB...

407

Agenda, DOE Meeting the Goals of Executive Order 13423, Strengthenin...  

NLE Websites -- All DOE Office Websites (Extended Search)

O 450.1A: Moderator: Beverly Whitehead (HS-22) * Overview of DOE Order 450.1A (Jane Powers, HS-22) * What is Required for an EMS to be "Fully Implemented" (Steven Woodbury,...

408

Overview: DOE Order 450.1A, Environmental Protection Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview: DOE Order 450.1A, Environmental Protection Program Jane Powers DOE Environmental Session June 5, 2008 What's Covered? Why Re-Write O 450.1? New EMS Requirements How Far...

409

ASKO Appliances: Order (2010-CE-04/0614)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered ASKO Appliances, Inc. to pay a $5,000 civil penalty after finding ASKO had failed to certify that certain models of dishwashers and clothes dryers comply with the applicable energy conservation standards.

410

Felix Storch: Order (2010-CE-03/04/0613)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Felix Storch, Inc. to pay a $5,000 civil penalty after finding Felix Storch had failed to certify that basic model DW 2432, a dishwasher, complies with the applicable energy conservation standards.

411

Ordering ARM data: A logical integration of the Data Archive...  

NLE Websites -- All DOE Office Websites (Extended Search)

integration of the two websites and build a new, more usable interface for ordering data. On 27 September 2005, this challenge was met with the implementation of a data...

412

Nordyne: Order (2010-CE-01/0210) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

(2010-CE-010210) October 8, 2010 DOE ordered Nordyne, LLC dba Garrison Heating and Cooling Products to pay a 10,000 civil penalty after finding Nordyne had failed to...

413

DOE Awards Small Business Task Order for Technical Support to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy (DOE) today awarded a task order for technical support services to TerranearPMC, LLC of Exton, PA to provide Spent Nuclear Fuel and Excess Nuclear Materials...

414

DOE Awards Small Business Task Order for Technical Support to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy (DOE) today awarded a task order for technical support services to TerranearPMC, LLC of Exton, Pennsylvania for support services to the DOE Office of Environmental...

415

May 17, 2012, Orders of Interest to the Board  

NLE Websites -- All DOE Office Websites (Extended Search)

Order Number Title O151.1C Comprehensive Emergency Management System O153.1 Departmental Radiological Emergency Response Assets O210.2A DOE Corporate Operating Experience Program...

416

An Interpretation of Atmospheric Low-Order Models  

Science Conference Proceedings (OSTI)

Low-order models (LOMs) arising in various popular fluid dynamic and atmospheric problems are shown to be equivalent to coupled three-mode nonlinear systems known in mechanics as Volterra gyrostats. The Volterra equations of the gyrostat differ ...

Alexander Gluhovsky; Ernest Agee

1997-03-01T23:59:59.000Z

417

DuraLamp USA: Order (2010-CE-0912)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered DuraLamp USA, Inc. to pay a $2,500 civil penalty after finding DuraLamp USA had failed to certify that model PAR 30, an incandescent reflector lamp, complies with the applicable energy conservation standards.

418

Conserved charges of order-parameter textures in Dirac systems  

E-Print Network (OSTI)

A simple expression for the induced fermion current in the presence of a texture in mass-order-parameters in two-dimensional condensed-matter Dirac systems is derived using the representation theory of Clifford algebras. In particular, it is shown that every texture in three mutually anticommuting order parameters, in graphene for example, implies an induced density of a properly defined conserved charge. The sufficient condition for the general charge to be the familiar electrical charge is that the remaining two anticommuting order parameters allowed by the particle-hole symmetry are the two phase components of some superconducting order. This allows eight different types of electrically charged textures in graphene or in the $\\pi$-flux Hamiltonian on the square lattice. Generalized charge of mass-textures on the surfaces of thin films of topological insulators, or in spinless Dirac fermions hopping on the honeycomb lattice is also discussed.

Igor F. Herbut; Chi-Ken Lu; Bitan Roy

2012-06-11T23:59:59.000Z

419

A Second-Order Bulk Boundary-Layer Model  

Science Conference Proceedings (OSTI)

Bulk mass-flux models represent the large eddies that are primarily responsible for the turbulent fluxes in the planetary boundary layer as convective circulations, with an associated convective mass flux. In order for such models to be useful, ...

David A. Randall; Qingqiu Shao; Chin-Hoh Moeng

1992-10-01T23:59:59.000Z

420

Microsoft PowerPoint - Executive Order13423rbl | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Microsoft PowerPoint - Executive Order13423rbl More Documents & Publications Microsoft PowerPoint - DonsSlides121307 OPAM Policy Acquisition Guides AttachmentFlash2010-39.pdf...

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Checkpoint repair for out-of-order execution machines  

Science Conference Proceedings (OSTI)

Out-of-order execution and branch prediction are two mechanisms that can be used profitably in the design of Supercomputers to increase performance. Unfortunately this means there must be some kind of repair mechanism, since situations do occur that ...

W. W. Hwu; Y. N. Patt

1987-06-01T23:59:59.000Z

422

The origins of ordering in CuPt  

Science Conference Proceedings (OSTI)

The alloy CuPt is one of the few that order into a L1{sub 1} crystal structure, i.e. planes of copper and planes of planes of planes of platinum perpendicular to the direction. For disordered CuPt, the calculated Warren-Cowley short-range order parameter indicates an instability to concentration fluctuations with a wave-vector of ({1/2}, {1/2}, {1/2}), consistent with L1{sub 1} ordering. We show that this rare tendency is due to this ordering vector arising from the large joint density of states associated with L point and X point van-Hove singularities which lie near the Fermi energy.

Clark, J.F.; Pinski, F.J. [Cincinnati Univ., OH (United States). Dept. of Physics; Sterne, P.A. [California Univ., Davis, CA (United States)]|[Lawrence Livermore National Lab., CA (United States); Johnson, D.D. [Sandia National Labs., Albuquerque, NM (United States); Staunton, J.B. [Warwick Univ., Coventry (United Kingdom). Dept. of Physics; Ginatempo, B. [Messina Univ. (Italy). Ist. di Fisica Teorica

1993-08-04T23:59:59.000Z

423

HKC-US: Order (2013-SE-33002) | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

civil penalty after finding HKC-US had failed to certify that one basic model of ceiling fan light kit complies with the applicable energy conservation standards. The Order adopted...

424

Aero-Tech: Order (2010-CE-1012) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 8, 2010 DOE issued an Order and closed this case against Aero-Tech Light Bulb Co., without civil penalty, after DOE found that Aero-Tech manufactured andor...

425

Philips: Order (2012-SE-2605) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

manufactured and distributed in commerce in the U.S. 7,498 units of basic model VEL-1S40-SC, noncompliant fluorescent lamp ballasts. The Order adopted a Compromise Agreement,...

426

The origins of ordering in CuPt  

SciTech Connect

The alloy CuPt is one of the few that order into a L1{sub 1} crystal structure, i.e. planes of copper and planes of planes of planes of platinum perpendicular to the < 111 > direction. For disordered CuPt, the calculated Warren-Cowley short-range order parameter indicates an instability to concentration fluctuations with a wave-vector of ({1/2}, {1/2}, {1/2}), consistent with L1{sub 1} ordering. We show that this rare tendency is due to this ordering vector arising from the large joint density of states associated with L point and X point van-Hove singularities which lie near the Fermi energy.

Clark, J.F.; Pinski, F.J. [Cincinnati Univ., OH (United States). Dept. of Physics; Sterne, P.A. [California Univ., Davis, CA (United States)]|[Lawrence Livermore National Lab., CA (United States); Johnson, D.D. [Sandia National Labs., Albuquerque, NM (United States); Staunton, J.B. [Warwick Univ., Coventry (United Kingdom). Dept. of Physics; Ginatempo, B. [Messina Univ. (Italy). Ist. di Fisica Teorica

1993-08-04T23:59:59.000Z

427

Task Order Awarded for Audit and Review Services  

Energy.gov (U.S. Department of Energy (DOE))

Cincinnati The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services.

428

Solving second order cone programming via a reduced augmented ...  

E-Print Network (OSTI)

If A1 does not have full row rank, then the component matrix. A1D?1. 1. AT. 1 of M is singular, and thus the smallest eigenvalue of M, ?min(M), is of the order.

429

Second-Order-Cone Constraints for Extended Trust-Region ...  

E-Print Network (OSTI)

Mar 4, 2011 ... Keywords: trust-region subproblem, second-order cone ..... (Note that the proof to this point does not use the assumption X11 + lu = (l + u)x1.

430

FAST FIRST-ORDER METHODS FOR STABLE PRINCIPAL ...  

E-Print Network (OSTI)

first-order methods can be applied to this problem very efficiently. ... by ONR grant N000140310514, NSF Grant DMS 10-16571 and DOE Grant DE-FG02-08-.

431

AN EFFICIENT ALGORITHM FOR SECOND-ORDER CONE LINEAR ...  

E-Print Network (OSTI)

linear transformation M ? Rnn in the second-order cone linear comple- ..... does not require extra storage except for the vector y(k) and several scalars. This.

432

STOCHASTIC FIRST- AND ZEROTH-ORDER METHODS FOR ...  

E-Print Network (OSTI)

applies only for gradient descent methods and does not show that the O(1/N) term is tight for all first-order methods. Finally, observe that we can use different...

433

Nonlinear-Programming Reformulation of the Order-Value ...  

E-Print Network (OSTI)

Order-value optimization (OVO) is a generalization of the min- imax problem .... Proof. Assume that x is a local minimizer and that (5) does not hold for all feasible ...

434

Superior orders: when and how to dissent in the military  

E-Print Network (OSTI)

The objective of this thesis is to determine under what circumstances a military officer should disobey or refuse to follow a superior order and also what additional actions the officer should take if he does not follow the order. Within a profession in which loyalty and obedience are valued so highly, there is often a reluctance to discuss the problem of superior orders. The problem is discussed from the perspective of the junior officer. Immanuel Kant's ethics are used as the basis for determining whether or not the order should be followed. Case studies from engineering ethics are examined to determine what avenues of dissent are available in that field. Military examples are then used to determine which of these avenues may be useful and appropriate for military officers.

Hildahl, Jessica Lynn

1995-01-01T23:59:59.000Z

435

A Statistical Plume Model with First-Order Decay  

Science Conference Proceedings (OSTI)

Many atmospheric contaminants decay or react in the atmosphere. in situations such as the diffusion of radioactive contaminants, certain chemical pollutants and viable microorganisms, a first-order decay rate is considered to be an appropriate ...

Thomas J. Overcamp

1982-11-01T23:59:59.000Z

436

Separation of High Order Harmonics with Fluoride Windows  

SciTech Connect

The lower orders produced in high order harmonic generation can be effciently temporally separated into monochromatic pulses by propagation in a Fluoride window while still preserving their femtosecond pulse duration. We present calculations for MgF2, CaF2, and LiF windows for the third, fifth, and seventh harmonics of 800 nm. We demonstrate the use of this simple and inexpensive technique in a femtosecond pump/probe experiment using the fifth harmonic.

Allison, Tom; van Tilborg, Jeroen; Wright, Travis; Hertlein, Marcus; Falcone, Roger; Belkacem, Ali

2010-08-02T23:59:59.000Z

437

Universality of second order transport in Gauss-Bonnet gravity  

E-Print Network (OSTI)

We compute all the second order transport coefficients of a hydrodynamic theory with a gravity dual which includes a Gauss-Bonnet term. We find that a particular linear combination of the second order transport coefficients, which was found to vanish in generic two derivative gravity theories with matter, remains zero even in the presence of the Gauss-Bonnet term. We contrast this behavior with the shear viscosity to entropy density ratio.

Evgeny Shaverin; Amos Yarom

2012-11-08T23:59:59.000Z

438

Thermal and hydrodynamic effects in the ordering of lamellar fluids  

E-Print Network (OSTI)

Phase separation in a complex fluid with lamellar order has been studied in the case of cold thermal fronts propagating diffusively from external walls. The velocity hydrodynamic modes are taken into account by coupling the convection-diffusion equation for the order parameter to a generalised Navier-Stokes equation. The dynamical equations are simulated by implementing a hybrid method based on a lattice Boltzmann algorithm coupled to finite difference schemes. Simulations show that the ordering process occurs with morphologies depending on the speed of the thermal fronts or, equivalently, on the value of the thermal conductivity {\\xi}. At large value of {\\xi}, as in instantaneous quenching, the system is frozen in entangled configurations at high viscosity while consists of grains with well ordered lamellae at low viscosity. By decreasing the value of {\\xi}, a regime with very ordered lamellae parallel to the thermal fronts is found. At very low values of {\\xi} the preferred orientation is perpendicular to the walls in d = 2, while perpendicular order is lost moving far from the walls in d = 3.

G. Gonnella; A. Lamura; A. Tiribocchi

2011-02-15T23:59:59.000Z

439

LOCAL ANISOTROPY, HIGHER ORDER STATISTICS, AND TURBULENCE SPECTRA  

SciTech Connect

Correlation anisotropy emerges dynamically in magnetohydrodynamics (MHD), producing stronger gradients across the large-scale mean magnetic field than along it. This occurs both globally and locally, and has significant implications in space and astrophysical plasmas, including particle scattering and transport, and theories of turbulence. Properties of local correlation anisotropy are further documented here by showing through numerical experiments that the effect is intensified in more localized estimates of the mean field. The mathematical formulation of this property shows that local anisotropy mixes second-order with higher order correlations. Sensitivity of local statistical estimates to higher order correlations can be understood in connection with the stochastic coordinate system inherent in such formulations. We demonstrate this in specific cases, and illustrate the connection to higher order statistics by showing the sensitivity of local anisotropy to phase randomization, after which the global measure of anisotropy is recovered at all scales of averaging. This establishes that anisotropy of the local structure function is not a measure of anisotropy of the energy spectrum. Evidently, the local enhancement of correlation anisotropy is of substantial fundamental interest and must be understood in terms of higher order correlations, specifically fourth-order and above.

Matthaeus, W. H.; Wan, M.; Osman, K. T. [Department of Physics and Astronomy, University of Delaware, DE (United States); Servidio, S.; Carbone, V. [Dipartimento di Fisica, Universita della Calabria, I-87036 Cosenza (Italy); Dmitruk, P. [Departamento de Fisica (FCEN-UBA and IFIBA-CONICET), Buenos Aires (Argentina); Oughton, S. [Department of Mathematics, University of Waikato, Hamilton 3240 (New Zealand)

2012-05-10T23:59:59.000Z

440

Fractal nature of medium-range order in metallic glasses  

Science Conference Proceedings (OSTI)

The atomic structure of metallic glasses has been a long-standing scientific mystery. Unlike crystalline metals, where long-range ordering is established by periodic stacking of fundamental building blocks known as unit cells, a metallic glass has no long-range translational order, although some degrees of short- and medium-range order do exist.1,2,3 Previous studies1,2,3,4 have identified solute-centered clusters, characterized by short-range order (SRO) in favor of unlike bonds, as the fundamental building blocks of metallic glasses. However, how these building blocks are connected or packed to form the medium range order (MRO) remains an open question.1,2,3 Here, based on neutron and x-ray diffraction experiments, we propose a new packing scheme - the self-similar packing of atomic clusters. We show that MRO has the characteristics of a fractal network with a dimension of 2.38, and is described by a power-law correlation function over the medium-range length scale. Our finding provides a new prospective of order in disordered materials and has broad implications for understanding the structure-property relationship in metallic glasses, particularly those involving change in length scales due to phase transformation and mechanical deformation.

Ma, Dong [ORNL; Stoica, Alexandru Dan [ORNL; Wang, Xun-Li [ORNL

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Interplay of order and chaos across a first-order quantum shape-phase transition in nuclei  

SciTech Connect

We study the nature of the dynamics in a first-order quantum phase transition between spherical and prolate-deformed nuclear shapes. Classical and quantum analyses reveal a change in the system from a chaotic Henon-Heiles behavior on the spherical side into a pronounced regular dynamics on the deformed side. Both order and chaos persist in the coexistence region and their interplay reflects the Landau potential landscape and the impact of collective rotations.

Leviatan, A.; Macek, M. [Racah Institute of Physics, Hebrew University, Jerusalem 91904 (Israel)

2012-10-20T23:59:59.000Z

442

A Novel Rule Ordering Approach in Classification Association Rule Mining  

E-Print Network (OSTI)

Abstract. A Classification Association Rule (CAR), a common type of mined knowledge in Data Mining, describes an implicative co-occurring relationship between a set of binary-valued data-attributes (items) and a pre-defined class, expressed in the form of an antecedent ? consequent-class rule. Classification Association Rule Mining (CARM) is a recent Classification Rule Mining (CRM) approach that builds an Association Rule Mining (ARM) based classifier using CARs. Regardless of which particular methodology is used to build it, a classifier is usually presented as an ordered CAR list, based on an applied rule ordering strategy. Five existing rule ordering mechanisms can be identified: (1) Confidence-Support-size_of_Antecedent (CSA), (2) size_of_Antecedent-Confidence-Support (ACS), (3) Weighted Relative Accuracy (WRA), (4) Laplace Accuracy, and (5) ? 2 Testing. In this paper, we divide the above mechanisms into two groups: (i) pure support-confidence framework like, and (ii) additive score assigning like. We consequently propose a hybrid rule ordering approach by combining one approach taken from (i) and another approach taken from (ii). The experimental results show that the proposed rule ordering approach performs well with respect to the accuracy of classification.

Yanbo J. Wang; Qin Xin; Frans Coenen

2007-01-01T23:59:59.000Z

443

Relaxations and Interfacial Water Ordering at the Corundum (110) Surface  

Science Conference Proceedings (OSTI)

In situ high resolution specular X-ray reflectivity measurements were used to examine relaxations and interfacial water ordering occurring at the corundum (110)-water interface. Sample preparation affected the resulting surface structure. Annealing in air at 1373 K produced a reconstructed surface formed through an apparently ordered aluminum vacancy. The effect of the reconstruction on in-plane periodicity was not determined. The remaining aluminum sites on the surface maintain full coordination by oxygen and the surface was coated with a layer of physically adsorbed water. Ordering of water further from the surface was not observed. Acid etching of this surface and preparing a surface through annealing at 723 K both produced an unreconstructed surface with identical relaxations and water ordering. Relaxations were confined primarily to the top {approx}4 {angstrom} of the surface and were dominated by an increased distribution width of the fully occupied surface aluminum site and outward relaxation of the oxygen surface functional groups. A layer of adsorbed water fully coated the surface and occurred in two distinct sites. Water above this showed signs of layering and indicated that water ordering extended 7-10 {angstrom} from the surface. Relaxations and the arrangement of interfacial water were nearly identical on both the unreconstructed corundum and isostructural hematite (110) surfaces. Comparison to corundum and hematite (012) suggests that the arrangement of interfacial water is primarily controlled by mineral surface structure.

Catalano, Jeffrey G. (WU)

2010-09-17T23:59:59.000Z

444

Asymptotic analysis of perturbed dust cosmologies to second order  

E-Print Network (OSTI)

Nonlinear perturbations of Friedmann-Lemaitre cosmologies with dust and a positive cosmological constant have recently attracted considerable attention. In this paper our first goal is to compare the evolution of the first and second order perturbations by determining their asymptotic behaviour at late times in ever-expanding models. We show that in the presence of spatial curvature K or a positive cosmological constant, the density perturbation approaches a finite limit both to first and second order, but the rate of approach depends on the model, being power law in the scale factor if the cosmological constant is positive but logarithmic if it is zero and and Kdoes not die away, i.e. it contributes on an equal footing as the growing mode to the asymptotic expression for the density perturbation. On the other hand, the future asymptotic regime of the Einstein-de Sitter universe (for which the cosmological constant and the spatial curvature are both zero) is completely different, as exemplified by the density perturbation which diverges; moreover, the second order perturbation diverges faster than the first order perturbation, which suggests that the Einstein-de Sitter universe is unstable to perturbations, and that the perturbation series do not converge towards the future. We conclude that the presence of spatial curvature or a cosmological constant stabilizes the perturbations. Our second goal is to derive an explicit expression for the second order density perturbation that can be used to study the effects of including a cosmological constant and spatial curvature.

Claes Uggla; John Wainwright

2013-03-19T23:59:59.000Z

445

Idaho National Engineering Laboratory Consent Order, June 14, 2000 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Engineering & Environmental Laboratory Idaho National Engineering & Environmental Laboratory Consent Order §39-4413 State Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Resolve situations which may involve violations of HWMA and the Idaho Rules and Standards for Hazardous Waste Parties DOE; Idaho Department of Health and Welfare Date 6/14/2000 SCOPE * Resolve situations which may involve violations of HWMA and the Idaho Rules and Standards for Hazardous Waste. * Incorporate and enforce the Action Plan which outlines compliance with regard to the Covered Matters. * This Consent Order covers three types of Covered Matters: 1) Covered Matters with Detailed Action Plans, 2) Covered Matters with Tiered Milestones, and 3) Covered Matters that are Closed. ESTABLISHING MILESTONES

446

Portsmouth Administrative Consent Order, August 12, 1997 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US EPA Administrative Consent Order US EPA Administrative Consent Order (No. OH7 890 008 983) State Ohio Agreement Type Consent Order Legal Driver(s) RCRA/CERCLA Scope Summary Establish a structure for oversight of DOE activities encouraging expeditious and efficient clean-up of Hazardous Waste/Constituents/Substances present at PORTS. Parties DOE; US EPA; State of Ohio Date 8/12/1997 SCOPE * Establish a structure for oversight of DOE activities encouraging expeditious and efficient clean-up of Hazardous Waste/Constituents/Substances present at PORTS. * Ensure compliance with RCRA and CERCLA. ESTABLISHING MILESTONES * By the fifteenth day of January, April, July, and October, DOE shall submit a report to US EPA describing response action activities during the preceding three months with

447

Executive Order 13123-Greening the Government Through Efficient Energy Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0851 0851 Federal Register Vol. 64, No. 109 Tuesday, June 8, 1999 Title 3- The President Executive Order 13123 of June 3, 1999 Greening the Government Through Efficient Energy Management By the authority vested in me as President by the Constitution and the laws of the United States of America, including the National Energy Conserva- tion Policy Act (Public Law 95-619, 92 Stat. 3206, 42 U.S.C. 8252 et seq.), as amended by the Energy Policy Act of 1992 (EPACT) (Public Law 102- 486, 106 Stat. 2776), and section 301 of title 3, United States Code, it is hereby ordered as follows: PART 1-PREAMBLE Section 101. Federal Leadership. The Federal Government, as the Nation's largest energy consumer, shall significantly improve its energy management in order to save taxpayer dollars and reduce emissions that contribute to

448

Special Report Order, Sandia Corporation - October 20, 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Report Order, Sandia Corporation - October 20, 2010 Special Report Order, Sandia Corporation - October 20, 2010 Special Report Order, Sandia Corporation - October 20, 2010 October 20, 2010 Issued to Sandia Corporation related to Nuclear Safety Quality Assurance Program Deficiencies at Sandia National Laboratories On April 30, 2008, Sandia Corporation (Sandia) submitted a report into the U.S. Department of Energy's (DOE) Noncompliance Tracking System (NTS) documenting potential noncompliances associated with deficiencies identified in the implementation of the nuclear safety quality assurance program at Sandia National Laboratories (SNL). The potential noncompliances documented in this NTS report stemmed from a DOE Office of Inspector General (IG) audit (Audit Report, DOE/IG-0799). On May 29, 2009, the Office of Health, Safety

449

High-Order Surface Reconstruction and its Applications | Argonne Leadership  

NLE Websites -- All DOE Office Websites (Extended Search)

High-Order Surface Reconstruction and its Applications High-Order Surface Reconstruction and its Applications Event Sponsor: Mathematics and Computing Science Seminar Start Date: Dec 12 2013 - 10:30am Building/Room: Building 240/Room 4301 Location: Argonne National Laboratory Speaker(s): Navamita Ray Speaker(s) Title: Postdoc Interviewee - MCS Host: Tim Tautges Surface meshes are widely used by many numerical methods for solving partial differential equations. They not only represent computational grids for various discretization methods, but also are numerical objects in themselves. The accuracy of numerical methods, especially high-order methods, are highly dependent on the geometrical accuracy of the mesh as well as on that of differential or integral quantities defined over them. The situation is further complicated if the surface mesh does not have an

450

Microsoft Word - Notice - Rate Order Signed.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

December 23, 2009 December 23, 2009 Notice - Rate Orders Signed The Deputy Secretary of Energy has signed Rate Orders 144 and 148, Orders Confirming, Approving, and Placing the Pick-Sloan Missouri Basin Program - Eastern Division Transmission and Ancillary Services and Transmission Service Penalty for Unreserved Use Formula Rates into effect on an interim basis on January 1, 2010. The Federal Register notice announcing these rates is expected to be published during the week of December 28-31, 2009. Once the Federal Register notice is published, a letter will be sent to our transmission customers and other interested parties providing rate information and a copy of the Federal Register notice. The rate announcement letter and Federal Register notice will also be posted to this web site and

451

Task Order Awarded for Technical and Safety Support Services | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Safety Support Services and Safety Support Services Task Order Awarded for Technical and Safety Support Services December 20, 2012 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a contract for technical support services to Link Technologies, Inc., of Germantown, MD for support services to the DOE Office of Environmental Management in Washington D.C. The contract or task order was a competitive small business set-aside for time-and-materials with an approximate value of $10 million, with a one-year performance period and two additional one-year options. Services to be performed under the task order include: Assess engineering, technical work, and project performance Assess quality assurance of projects managed by field elements

452

President Bush Issues Executive Order Designating ITER International Fusion  

NLE Websites -- All DOE Office Websites (Extended Search)

President President Bush Issues Executive Order Designating ITER International Fusion Energy Organization A Public Interest Organization News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 11.19.07 President Bush Issues Executive Order Designating ITER International Fusion Energy Organization A Public Interest Organization Print Text Size: A A A Subscribe FeedbackShare Page November 19, 2007 The White House today announced that President Bush has issued an Executive Order designating the ITER International Fusion Energy Organization as a public international organization. For the purposes of the International

453

Nevada Test Site FFCA Consent Order, May 10, 1996 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Facility Agreement and Consent Order Federal Facility Agreement and Consent Order (FFACO) State Nevada Agreement Type Federal Facility Agreement and Consent Order Legal Driver(s) FFCAct Scope Summary Identify sites of potential historic contamination and implement proposed corrective actions Parties DOE; Department of Defense (DoD); Nevada Division of Environmental Protection (NDEP) Date 5/10/1996 SCOPE * Identify sites of potential historic contamination and implement proposed corrective actions. * Establish specific sampling and monitoring requirements, including drilling and subsurface sampling. ESTABLISHING MILESTONES * Within sixty (60) calendar days following the signing of this Agreement, the parties shall meet to review Appendices II-IV and concur on the classification of all presently

454

N:\WPWIN60\ORDERS\PP-118.ORD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HILL COUNTY ELECTRIC COOPERATIVE, INC. HILL COUNTY ELECTRIC COOPERATIVE, INC. ORDER NO. PP-118 I. BACKGROUND The Office of Fossil Energy (FE) of the Department of Energy (DOE) has the responsibility for implementing Executive Order 10485, as amended by Executive Order 12038, which requires the issuance of Presidential permits for the construction, connection, operation, and maintenance of electric transmission facilities at the United States international border. In an application dated July 11, 1996, as amended on July 25, 1996, Hill County Electric Cooperative, Inc. (Hill County) applied to FE for a Presidential permit to construct a new 69- kilovolt (kV) electric transmission facility between the United States and Canada from a point in

455

American Indian Policy and Relevant DOE and Executive Orders | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Programs » Tribal Programs » American Indian Policy and Relevant DOE and Executive Orders American Indian Policy and Relevant DOE and Executive Orders Over the course of American history, the Federal government's relationship with Indian Tribes has been defined and modified by treaties, executive orders, court decisions, specific legislation passed by Congress, and regulations. Important rights were guaranteed to Tribes by treaty, with many of these rights still enforceable today. Case law, over the years, has dealt with the status of Indian Tribes and their special relationship to the Federal government. Legislation, passed by Congress reflects the national Indian policy at the time of enactment. Current Federal Indian policy recognizes that Indian Tribes are an integral

456

Ordering Information | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Certified Certified Reference Materials (CRMs) » Ordering Information New Brunswick Laboratory (NBL) NBL Home About Programs Certified Reference Materials (CRMs) Prices and Certificates Ordering Information Training Categorical Exclusion Determinations News Contact Information New Brunswick Laboratory U.S. Department of Energy Building 350 9800 South Cass Avenue Argonne, IL 60439-4899 P: (630) 252-2442 (NBL) P: (630) 252-2767 (CRM sales) F: (630) 252-6256 E: usdoe.nbl@ch.doe.gov Certified Reference Materials (CRMs) Ordering Information Print Text Size: A A A RSS Feeds FeedbackShare Page Those CRMs that contain plutonium, enriched uranium, or U-233 are defined by 10 CFR 110, and are so noted in the catalog. These CRMs may be purchased domestically only under a valid DOE contractor or NRC license number.

457

O:\ELECTRIC\ORDERS\EA-200-a.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order No. EA-200-A Order No. EA-200-A I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On April 6, 1999, in Order No. EA-200, the Office of Fossil Energy (FE) of the Department of Energy (DOE) authorized five of the public utility affiliates of American Electric Power Service Corporation (AEPSC) to transmit electric energy from the United States to Canada. The entities authorized to export included Appalachian Power Company, Columbus Southern Power Company, Indiana Michigan Power Company, Kentucky Power Company, and Ohio Power Company. That two-year authorization expired on April 6, 2001. On March 23, 2001, AEPSC, on behalf of nine of its

458

Special Report Order, Sandia Corporation - October 20, 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Report Order, Sandia Corporation - October 20, 2010 Special Report Order, Sandia Corporation - October 20, 2010 Special Report Order, Sandia Corporation - October 20, 2010 October 20, 2010 Issued to Sandia Corporation related to Nuclear Safety Quality Assurance Program Deficiencies at Sandia National Laboratories On April 30, 2008, Sandia Corporation (Sandia) submitted a report into the U.S. Department of Energy's (DOE) Noncompliance Tracking System (NTS) documenting potential noncompliances associated with deficiencies identified in the implementation of the nuclear safety quality assurance program at Sandia National Laboratories (SNL). The potential noncompliances documented in this NTS report stemmed from a DOE Office of Inspector General (IG) audit (Audit Report, DOE/IG-0799). On May 29, 2009, the Office of Health, Safety

459

Oak Ridge Reservation Compliance Order, September 26, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Reservation Compliance Order, September Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge Reservation," hereafter known as the Plan. * Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan. ESTABLISHING MILESTONES * Schedules are contained in the Plan.

460

Order parameter prediction from molecular dynamics simulations in proteins  

E-Print Network (OSTI)

A molecular understanding of how protein function is related to protein structure will require an ability to understand large conformational changes between multiple states. Unfortunately these states are often separated by high free energy barriers and within a complex energy landscape. This makes it very difficult to reliably connect, for example by all-atom molecular dynamics calculations, the states, their energies and the pathways between them. A major issue needed to improve sampling on the intermediate states is an order parameter -- a reduced descriptor for the major subset of degrees of freedom -- that can be used to aid sampling for the large conformational change. We present a novel way to combine information from molecular dynamics using non-linear time series and dimensionality reduction, in order to quantitatively determine an order parameter connecting two large-scale conformationally distinct protein states. This new method suggests an implementation for molecular dynamics calculations that ma...

Perilla, Juan R

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Self-organized lattice of ordered quantum dot molecules  

SciTech Connect

Ordered groups of InAs quantum dots (QDs), lateral QD molecules, are created by self-organized anisotropic strain engineering of a (In,Ga)As/GaAs superlattice (SL) template on GaAs (311)B in molecular-beam epitaxy. During stacking, the SL template self-organizes into a two-dimensionally ordered strain modulated network on a mesoscopic length scale. InAs QDs preferentially grow on top of the nodes of the network due to local strain recognition. The QDs form a lattice of separated groups of closely spaced ordered QDs whose number can be controlled by the GaAs separation layer thickness on top of the SL template. The QD groups exhibit excellent optical properties up to room temperature.

Lippen, T. von; Noetzel, R.; Hamhuis, G.J.; Wolter, J.H. [eiTT/COBRA Inter-University Research Institute, Eindhoven University of Technology, 5600 MB Eindhoven (Netherlands)

2004-07-05T23:59:59.000Z

462

Higher-order discrete variational problems with constraints  

E-Print Network (OSTI)

An interesting family of geometric integrators for Lagrangian systems can be defined using discretizations of the Hamilton's principle of critical action. This family of geometric integrators is called variational integrators. In this paper, we derive new variational integrators for higher-order lagrangian mechanical system subjected to higher-order constraints. From the discretization of the variational principles, we show that our methods are automatically symplectic and, in consequence, with a very good energy behavior. Additionally, the symmetries of the discrete Lagrangian imply that momenta is conserved by the integrator. Moreover, we extend our construction to variational integrators where the lagrangian is explicitly time-dependent. Finally, some motivating applications of higher-order problems are considered; in particular, optimal control problems for explicitly time-dependent underactuated systems and an interpolation problem on Riemannian manifolds.

Leonardo Colombo; David Martn de Diego; Marcela Zuccalli

2013-06-03T23:59:59.000Z

463

alpha_s and the tau hadronic width: fixed-order, contour-improved and higher-order perturbation theory  

E-Print Network (OSTI)

The determination of $\\alpha_s$ from hadronic $\\tau$ decays is revisited, with a special emphasis on the question of higher-order perturbative corrections and different possibilities of resumming the perturbative series with the renormalisation group: fixed-order (FOPT) vs. contour-improved perturbation theory (CIPT). The difference between these approaches has evolved into a systematic effect that does not go away as higher orders in the perturbative expansion are added. We attempt to clarify under which circumstances one or the other approach provides a better approximation to the true result. To this end, we propose to describe the Adler function series by a model that includes the exactly known coefficients and theoretical constraints on the large-order behaviour originating from the operator product expansion and the renormalisation group. Within this framework we find that while CIPT is unable to account for the fully resummed series, FOPT smoothly approaches the Borel sum, before the expected divergent behaviour sets in at even higher orders. Employing FOPT up to the fifth order to determine $\\alpha_s$ in the $\\MSb$ scheme, we obtain $\\alpha_s(M_\\tau)=0.320 {}^{+0.012}_{-0.007}$, corresponding to $\\alpha_s(M_Z) = 0.1185 {}^{+0.0014}_{-0.0009}$. Improving this result by including yet higher orders from our model yields $\\alpha_s(M_\\tau)=0.316 \\pm 0.006$, which after evolution leads to $\\alpha_s(M_Z) = 0.1180 \\pm 0.0008$. Our results are lower than previous values obtained from $\\tau$ decays.

Martin Beneke; Matthias Jamin

2008-06-19T23:59:59.000Z

464

Molecular Design of Branched and Binary Molecules at Ordered Interfaces  

SciTech Connect

This study examined five different branched molecular architectures to discern the effect of design on the ability of molecules to form ordered structures at interfaces. Photochromic monodendrons formed kinked packing structures at the air-water interface due to the cross-sectional area mismatch created by varying number of alkyl tails and the hydrophilic polar head group. The lower generations formed orthorhombic unit cell with long range ordering despite the alkyl tails tilted to a large degree. Favorable interactions between liquid crystalline terminal groups and the underlying substrate were observed to compel a flexible carbosilane dendrimer core to form a compressed elliptical conformation which packed stagger within lamellae domains with limited short range ordering. A twelve arm binary star polymer was observed to form two dimensional micelles at the air-water interface attributed to the higher polystyrene block composition. Linear rod-coil molecules formed a multitude of packing structures at the air-water interface due to the varying composition. Tree-like rod-coil molecules demonstrated the ability to form one-dimensional structures at the air-water interface and at the air-solvent interface caused by the preferential ordering of the rigid rod cores. The role of molecular architecture and composition was examined and the influence chemically competing fragments was shown to exert on the packing structure. The amphiphilic balance of the different molecular series exhibited control on the ordering behavior at the air-water interface and within bulk structures. The shell nature and tail type was determined to dictate the preferential ordering structure and molecular reorganization at interfaces with the core nature effect secondary.

Kirsten Larson Genson

2005-12-27T23:59:59.000Z

465

Higher Order Contributions to the 21 cm Power Spectrum  

E-Print Network (OSTI)

We consider the contribution of 3rd and 4th order terms to the power spectrum of 21 cm brightness temperature fluctuations during the epoch of reionization, which arise because the 21 cm brightness temperature involves a product of the hydrogenic neutral fraction and the gas density. The 3rd order terms vanish for Gaussian random fields, and have been previously neglected or ignored. We measure these higher order terms from radiative transfer simulations and estimate them using cosmological perturbation theory. In our simulated models, the higher order terms are significant: neglecting them leads to a >~100% error in 21 cm power spectrum predictions on scales of k >~ 1 Mpc^{-1} when the neutral fraction is ~0.5. The higher order terms have a simple physical interpretation. On small scales they are produced by gravitational mode coupling. Small scale structure grows more readily in large-scale overdense regions, but the same regions tend to be ionized and hence do not contribute to the 21 cm signal. This acts to suppress the influence of non-linear density fluctuations and the small-scale amplitude of the 21 cm power spectrum. These results modify earlier intuition that the 21 cm power spectrum simply traces the density power spectrum on scales smaller than that of a typical bubble, and imply that small scale measurements contain more information about the nature of the ionizing sources than previously believed. On large scales, higher order moments are not directly related to gravity. They are non-zero because over-dense regions tend to ionize first and are important in magnitude at late times owing to the large fluctuations in the neutral fraction. (Abridged)

Adam Lidz; Oliver Zahn; Matthew McQuinn; Matias Zaldarriaga; Suvendra Dutta; Lars Hernquist

2006-10-02T23:59:59.000Z

466

Executive Order 13270: Tribal Colleges and Universities (2002) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

270: Tribal Colleges and Universities (2002) 270: Tribal Colleges and Universities (2002) Executive Order 13270: Tribal Colleges and Universities (2002) Executive Order 13270: Tribal Colleges and Universities (2002). Ensures that Tribal colleges and universities receive support from the Federal government to assist these schools in providing high-quality educational opportunities for their students. This EO establishes the President's Board on Tribal Colleges and Universities (PBTCU), which includes representatives of tribal colleges. The PBTCU is assisted with its recommendations through consultation with the White House Initiative on Tribal Colleges and Universities, which is composed of an appointed official from each department and agency, as determined by the Secretary of the Department of Education.

467

Federal Energy Management Program: Publications - Ordered by Topic  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications - Ordered by Topic Publications - Ordered by Topic FEMP provides numerous publications and resources to assist Federal agencies in energy management initiatives. Below are a select group of these resources organized by category. For additional resources, please browse the full FEMP Web site. Annual Reports Distributed Energy Resources/ Combined Heat and Power Energy Awareness/Outreach for Federal Facilities Energy-Efficient Products Energy Savings Performance Contracts Federal Legislation, Regulation, and Guidance Federal Fleets FEMP Focus Newsletter FEMP Programs/Miscellaneous Heating and Cooling Labs21 Life-Cycle Costing Lighting New Construction/Retrofits New Technologies Operations and Maintenance Renewable Energy Sustainable Design and Operations Utility Energy Services Contracts

468

Executive Order 13270: Tribal Colleges and Universities (2002) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

270: Tribal Colleges and Universities (2002) 270: Tribal Colleges and Universities (2002) Executive Order 13270: Tribal Colleges and Universities (2002) Executive Order 13270: Tribal Colleges and Universities (2002). Ensures that Tribal colleges and universities receive support from the Federal government to assist these schools in providing high-quality educational opportunities for their students. This EO establishes the President's Board on Tribal Colleges and Universities (PBTCU), which includes representatives of tribal colleges. The PBTCU is assisted with its recommendations through consultation with the White House Initiative on Tribal Colleges and Universities, which is composed of an appointed official from each department and agency, as determined by the Secretary of the Department of Education.

469

Distinguishing Patterns of Charge Order: Stripes or Checkerboards  

SciTech Connect

In two dimensions, quenched disorder always rounds transitions involving the breaking of spatial symmetries so, in practice, it can often be difficult to infer what form the symmetry breaking would take in the 'ideal,' zero disorder limit. We discuss methods of data analysis which can be useful for making such inferences, and apply them to the problem of determining whether the preferred order in the cuprates is 'stripes' or 'checkerboards.' In many cases we show that the experiments clearly indicate stripe order, while in others (where the observed correlation length is short), the answer is presently uncertain.

Robertson, J.A.

2010-04-06T23:59:59.000Z

470

Executive Order 13592: Improving American Indian and Alaska Native  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

592: Improving American Indian and Alaska Native 592: Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011) Executive Order 13592: Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011) Superseded EO 13021 to ensure that all American Indian students, regardless of which institution they attend, receive support from the federal government at elementary through college levels. This EO also creates an Interagency Working Group on AI/AN Education to establish educational goals across the government. Executive Order 13592: Improving American Indian and Alaska Native Educational Opportunities and Strengthening Tribal Colleges and Universities (2011) More Documents & Publications

471

SF 6432-PO Standard Terms and Conditions for Purchase Orders  

NLE Websites -- All DOE Office Websites (Extended Search)

PO (04-95) PO (04-95) SECTION II STANDARD TERMS AND CONDITIONS FOR PURCHASE ORDERS INDEX OF CLAUSES AWARD BASIS (Applicable only to the Request for Quotation). Unless otherwise specified in Section I of the RFQ, award will be on the basis of low net cost to Sandia. Low net cost includes price, transportation charges, and payment discount terms. ______________________________________________________________________________________________________________________________ The terms and conditions stated for this Purchase Order, referred herein as "contract," are the only ones governing this transaction and cannot be changed or terminated orally. No terms and conditions appearing on any form originated by the Contractor shall be applicable. ______________________________________________________________________________________________________________________________

472

Student Temporary Employment Program | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

employment. For STEP eligibility you must be: * a United States citizen; * at least 16 years old; * pursuing a high school diploma or General Equivalency Diploma (GED),...

473

Student Temporary Employment Program | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

a college degree; * taking a half-time academic course load; * maintaining a 2.5 GPA or higher; * in good academic standing as determined by your academic institution; and *...

474

Student Temporary Employment Program | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

missions. Now here is the best news: you will be paid at regular government salary rates in line with your assigned duties, and you can be promoted or rewarded based on your...

475

Assembly of ordered carbon shells on semiconducting nanomaterials  

DOE Patents (OSTI)

In some embodiments of the invention, encapsulated semiconducting nanomaterials are described. In certain embodiments the nanostructures described are semiconducting nanomaterials encapsulated with ordered carbon shells. In some aspects a method for producing encapsulated semiconducting nanomaterials is disclosed. In some embodiments applications of encapsulated semiconducting nanomaterials are described.

Sutter, Eli Anguelova; Sutter, Peter Werner

2012-10-02T23:59:59.000Z

476

Short Order Macromedia Dreamweaver 4, 1st edition  

Science Conference Proceedings (OSTI)

From the Publisher:Short Order Macromedia Dreamweaver 4 is a task-based tutorial, perfect for teaching how to build and maintain sites in Dreamweaver. The step-by-step progression of the complete Web site creation process is presented in ...

Steve Moniz

2001-05-01T23:59:59.000Z

477

Ordered Intermetallics as Electrocatalysts for Fuel Cell Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Ordered Intermetallics as Ordered Intermetallics as Electrocatalysts for Fuel Cell Applications Héctor D. Abruña, Francis J. DiSalvo Dept. of Chemistry and Chemical Biology Baker Laboratory, Cornell University Ithaca, New York 14853-1301 Pt PtBi 2.4 mA/cm 2 0.063 mA/cm 2 x p a n d e d Pt (111) plane Pt-Pt 2.77 Å PtBi (001) plane Pt-Pt 4.32 Å Alloys vs. Ordered Intermetallics (A) Alloy; e.g. Pt/Ru (1:1) (B) Ordered Intermetallic e.g. BiPt Bismuth Platinum (BiPt) Intermetallic Phase ¾ Powder Refinement for BiPt ---- Residual between experimental P6 3 /mmc a = c = 5.490 Å Pt Bi Diffraction X-ray 4.315 Å and theoretical results Platinum vs. PtBi Pt (111) plane Pt-Pt 2.77 Å PtBi (001) plane Pt-Pt 4.32 Å Voltammetric Profile in H 2 SO 4 ¾ Cyclic Voltammetry in 0.1 M H 2 SO 4 at a sweep rate of 10 mV/s

478

Odd-order aberration cancellation in correlated-photon imaging  

Science Conference Proceedings (OSTI)

We discuss a correlated two-photon imaging apparatus that is capable of producing images that are free of the effects of odd-order aberration introduced by the optical system. We show that both quantum-entangled and classically correlated light sources are capable of producing the desired spatial-aberration cancellation.

Simon, D. S. [Department of Electrical and Computer Engineering, Boston University, 8 Saint Mary's Street, Boston, Massachusetts 02215 (United States); Photonics Center, Boston University, 8 Saint Mary's Street, Boston, Massachusetts 02215 (United States); Sergienko, A. V. [Department of Electrical and Computer Engineering, Boston University, 8 Saint Mary's Street, Boston, Massachusetts 02215 (United States); Photonics Center, Boston University, 8 Saint Mary's Street, Boston, Massachusetts 02215 (United States); Department of Physics, Boston University, 590 Commonwealth Avenue, Boston, Massachusetts 02215 (United States)

2010-08-15T23:59:59.000Z

479

Discrete second order adjoints in atmospheric chemical transport modeling  

Science Conference Proceedings (OSTI)

Atmospheric chemical transport models (CTMs) are essential tools for the study of air pollution, for environmental policy decisions, for the interpretation of observational data, and for producing air quality forecasts. Many air quality studies require ... Keywords: 65, Chemical transport models, Hessian singular vectors, Optimization, Second order adjoints, Sensitivity analysis, Stiff equations

Adrian Sandu; Lin Zhang

2008-06-01T23:59:59.000Z

480

Supplier selection and order lot sizing modeling: A review  

Science Conference Proceedings (OSTI)

With globalization and the emergence of the extended enterprise of interdependent organizations, there has been a steady increase in the outsourcing of parts and services. This has led firms to give more importance to the purchasing function and its ... Keywords: Auctions, Decision models, Order sizing, Outsourcing, Purchasing, Supplier selection

Najla Aissaoui; Mohamed Haouari; Elkafi Hassini

2007-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "temporary restraining order" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Second-order accurate projective integrators for multiscale problems  

Science Conference Proceedings (OSTI)

We introduce new projective versions of second-order accurate Runge-Kutta and Adams-Bashforth methods, and demonstrate their use as outer integrators in solving stiff differential systems. An important outcome is that the new outer integrators, when ... Keywords: Explicit, Multiscale, Parabolic, Stability, Stiff, Teleprojective integration

Steven L. Lee; C. William Gear

2007-04-01T23:59:59.000Z

482

Low-order tensor decompositions for social tagging recommendation  

Science Conference Proceedings (OSTI)

Social tagging recommendation is an urgent and useful enabling technology for Web 2.0. In this paper, we present a systematic study of low-order tensor decomposition approach that are specifically targeted at the very sparse data problem in tagging recommendation ... Keywords: graph mining, recommendation system, social network

Yuanzhe Cai; Miao Zhang; Dijun Luo; Chris Ding; Sharma Chakravarthy

2011-02-01T23:59:59.000Z

483

A machine-checked proof of the odd order theorem  

Science Conference Proceedings (OSTI)

This paper reports on a six-year collaborative effort that culminated in a complete formalization of a proof of the Feit-Thompson Odd Order Theorem in the Coq proof assistant. The formalized proof is constructive, and relies on nothing but the axioms ...

Georges Gonthier, Andrea Asperti, Jeremy Avigad, Yves Bertot, Cyril Cohen, Franois Garillot, Stphane Le Roux, Assia Mahboubi, Russell O'Connor, Sidi Ould Biha, Ioana Pasca, Laurence Rideau, Alexey Solovyev, Enrico Tassi, Laurent Thry

2013-07-01T23:59:59.000Z

484

FirstOrder Representations of Discrete Linear MultidimensionalSystems  

Science Conference Proceedings (OSTI)

The classical local statespace models for discrete multidimensional linear systems, as proposed by Roesser or Fornasini and Marchesini, require causality of the resulting transfer matrices. We consider a generalization comprising non-causal ... Keywords: (Laurent) polynomial matrices, behavior, first, input, kernel and image representation, linear fractional transformation, minimality, order representation, output structure, properness

Eva Zerz

2000-10-01T23:59:59.000Z

485

Higher Order Recurrences for Analytical Functions of Tchebysheff Type  

E-Print Network (OSTI)

One parameter subgroups of the group of hyperbolons of volume one when exploited accurately allow one to define and investigate higher order hyperbolic-trigonometric generalization of corresponding polynomials. In parallel functions of roots of polynomials of any degree are studied as possible extension of symmetric functions considered one hundred twenty six years ago in the inspiring famous lucasian paper.

A. K. Kwasniewski

2004-02-29T23:59:59.000Z

486

Commercial Cooling Par Engineering: Order (2013-CE-5312)  

Energy.gov (U.S. Department of Energy (DOE))

DOE ordered Commercial Cooling Par Engineering, Inc. to pay a $8,000 civil penalty after finding Commercial Cooling Par Engineering had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

487

Extraction of signals with higher order temporal structure using Correntropy  

Science Conference Proceedings (OSTI)

This paper addresses the problem of semi-blindly extracting one single desired signal using a priori information about its higher order temporal structure. Our approach is based on the maximization of the autocorrentropy function for a given time delay. ... Keywords: Blind source extraction, Correntropy, Information Theoretic Learning (ITL)

Eder Santana; Jose C. Principe; Ewaldo Santana; Allan Kardec Barros

2012-08-01T23:59:59.000Z

488

On Parallel Asynchronous HighOrder Solutions of Parabolic PDEs  

E-Print Network (OSTI)

On Parallel Asynchronous High­Order Solutions of Parabolic PDEs appeared in Numerical Algorithms Parabolic PDEs. They are asynchronous in the sense that each processor is allowed to advance at its own and synchronous finite difference methods, parabolic finite difference approximations with constant coefficients

Averbuch, Amir

489

Practical solution techniques for first-order MDPs  

Science Conference Proceedings (OSTI)

Many traditional solution approaches to relationally specified decision-theoretic planning problems (e.g., those stated in the probabilistic planning domain description language, or PPDDL) ground the specification with respect to a specific instantiation ... Keywords: First-order logic, MDPs, Planning

Scott Sanner; Craig Boutilier

2009-04-01T23:59:59.000Z

490

AGENCY: Federal Energy Regulatory Commission. ACTION: Order Granting Clarification  

E-Print Network (OSTI)

SUMMARY: In this Order Granting Clarification, the Commission addresses pending requests to clarify Form No. 552, under which natural gas market participants must annually report information regarding physical natural gas transactions that use an index or that contribute to or may contribute to the formation of a gas index. Order No. 704 required market participants to file these reports in order to provide greater transparency concerning the use of indices to price natural gas and how well index prices reflect market forces. Order No. 704-C revises Form No. 552 so as to (1) exempt from reporting any unexercised options to take gas under a take-or-release contract; (2) clarify the definition of exempt unprocessed natural gas transactions as those involving gas that is both not yet processed (to separate and recover natural gas liquids), and still upstream of a processing facility; (3) exempt from reporting cash-out and imbalance transactions, since they were burdensome to report and provided little market information; (4) strike the forms references to the blanket sales certificates issued under 284.402 or 284.284, sinceDocket No. RM07-10-002- 2-they were burdensome to report and provided little market information, so as to also

unknown authors

2010-01-01T23:59:59.000Z

491

Nuclear Magnetism and Electronic Order in 13 C Nanotubes  

E-Print Network (OSTI)

Nuclear Magnetism and Electronic Order in 13 C Nanotubes Bernd Braunecker,1 Pascal Simon,1 on nuclear magnetism in one dimension. If the electrons are in the metallic, Luttinger liquid regime, we show that even a very weak hyperfine coupling to the 13C nuclear spins has a striking effect: The system

Braunecker, Bernd

492

A Hybrid Second Order Scheme for Shallow Water Flows  

Science Conference Proceedings (OSTI)

We extend the well-balanced second order hybrid scheme developed in Donat and Martinez-Gavara (J. Sci. Comput., to appear) to the one-dimensional and two-dimensional shallow water system. We show that the scheme is exactly well-balanced for quiescent ... Keywords: C-property, Hyperbolic balance laws, Well-balanced schemes

A. Martinez-Gavara; R. Donat

2011-07-01T23:59:59.000Z

493

A New Fourth-Order Enstrophy and Energy Conserving Scheme  

Science Conference Proceedings (OSTI)

A new pseudo-fourth-order finite-difference scheme for the shallow-water and primitive equations is derived. This scheme is a C-grid scheme that conserves energy and conserves enstrophy in the nondivergent limit. The accuracy of the scheme is ...

Frank Abramopoulos

1991-01-01T23:59:59.000Z

494

Marketing Order Impact on the Organic Sector: Almonds, Kiwifruit and Winter Pears  

E-Print Network (OSTI)

winter pear marketing order does not require adherence to79 marketing year. The order does require federal inspectionkiwifruit order is not impacted because it does not include

Carman, Hoy F.; Klonsky, Karen; Beaujard, Armelle; Rodriguez, Ana Maria

2004-01-01T23:59:59.000Z

495

Consent Order, Lawrence Livermore National National Security, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lawrence Livermore National National Security, LLC - Lawrence Livermore National National Security, LLC - WCO-2010-01 Consent Order, Lawrence Livermore National National Security, LLC - WCO-2010-01 October 29, 2010 Consent Order issued to Lawrence Livermore National Security, LLC for deficiencies associated with the Lawrence Livermore National Laboratory Chronic Beryllium Disease Prevention Program This letter refers to the Office of Health, Safety and Security, Office of Enforcement investigation into deficiencies associated with the Lawrence Livermore National Laboratory (LLNL) Chronic Beryllium Disease Prevention Program (CBDPP) and related work planning and control processes. The results of the investigation were provided to Lawrence Livermore National Security, LLC (LLNS) in an Investigation Report dated July 7, 2009. An

496

Executive Order 13270: Tribal Colleges and Universities (2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5288 5288 Federal Register / Vol. 67, No. 130 / Monday, July 8, 2002 / Presidential Documents Executive Order 13270 of July 3, 2002 Tribal Colleges and Universities By the authority vested in me as President by the Constitution and the laws of the United States of America, it is hereby ordered as follows: Section 1. Policy. There is a unique relationship between the United States and Indian tribes, and a special relationship between the United States and Alaska Native entities. It is the policy of the Federal Government that this Nation's commitment to educational excellence and opportunity must extend as well to the tribal colleges and universities (tribal colleges) that serve Indian tribes and Alaska Native entities. The President's Board of Advisors on Tribal Colleges and Universities (the ''Board'') and the White

497

Order Module--RADIATION PROTECTION PROGRAMS GUIDE | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RADIATION PROTECTION PROGRAMS GUIDE RADIATION PROTECTION PROGRAMS GUIDE Order Module--RADIATION PROTECTION PROGRAMS GUIDE The familiar level of this module is designed to provide the basic information related to DOE G 441.1-1C, Radiation Protection Programs Guide, as required in DOE-STD-1174-2003, Radiation Protection Functional Area Qualification Standard, December 2003. Completion of this module also meets certain requirements associated with the DOE Facility Representative Program and the DOE Intern Program. The information contained in this module addresses specific requirements and as such does not include the entire text of the source document. Before continuing, you should obtain a copy of the Order. Copies of the DOE Directives are available at http://www.directives.doe.gov/ or through the course manager. In March

498

Descriptions of Task Order Schedules and Placement of Pricing Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

499

Los Alamos National Laboratory Compliance Order, October 4, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Facility Compliance Order Federal Facility Compliance Order State New Mexico Agreement Type Compliance Agreement Legal Driver(s) New Mexico Hazardous Waste Act (NMHWA)/ FFCAct /RCRA Scope Summary Require compliance with a Site Treatment Plan for the treatment of mixed waste at Los Alamos National Lab. Parties DOE; University of California; New Mexico Environment Department Date 10/04/1995 SCOPE * Require compliance with a Site Treatment Plan for the treatment of mixed waste at Los Alamos National Lab. * Bring the Los Alamos National Lab into compliance with the requirements for the storage and treatment of mixed waste under RCRA and the NMHWA. * Establish that DOE and the University of California have both joint and several liability for meeting the conditions of the agreement.

500

2011-SCE-1605 YMGI Order Agreement.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

YMGI Group LLC, YMGI Group LLC, Respondent BEFORE THE U.S. DEPARTMENT OF ENERGY Washington, D.C. 20585 ) ) ) ) ) ) ORDER Case Number: 20 11-SCE-1605 By the General Counsel, U.S. Department of Energy: 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Depmiment of Energy ("DOE") and YMGI Group LLC ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance certification requirements located at 10 C.F.R. § 429.12 and distribution in commerce in the U.S. of basic models of a covered product that failed to meet the energy conservation requirements as described at 10 C.F.R. § 430.32( c). 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this