National Library of Energy BETA

Sample records for technology park land

  1. EA-1175: Proposed Title Transfer of East Tennessee Technology Park Land and Facilities, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to transfer the title of unneeded DOE real property located at the U.S. Department of Energy East Tennessee Technology Park (ETTP) in...

  2. EA-2000: Proposed Land Transfer to Develop a General Aviation Airport at the East Tennessee Technology Park Heritage Center, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    DOE is preparing an EA to assess potential environmental impacts of the proposed land transfer to the Metropolitan Knoxville Airport Authority for the development of a general aviation airport at the East Tennessee Technology Park Heritage Center, in Oak Ridge, Tennessee.

  3. Parking Management and Downtown Land Development: The Case of Downtown Berkeley, CA

    E-Print Network [OSTI]

    Deakin, Elizabeth

    2006-01-01

    Parking to deter spillover parking in neighborhoods TRB 2004Parking Management and Downtown Land Development: The Casefrom a study of land use, parking, mode choice, and housing

  4. Sandia Energy - Sandia Science & Technology Park: Acquisition...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science & Technology Park: Acquisition of Companies Reflects Growth of Industry in Park Home Partnership Research & Capabilities Customers & Partners Sandia Science & Technology...

  5. Vehicle Technologies Office: AVTA - Evaluating National Parks...

    Energy Savers [EERE]

    Office: AVTA - Evaluating National Parks and Forest Service Fleets for Plug-in Electric Vehicles Vehicle Technologies Office: AVTA - Evaluating National Parks and Forest...

  6. Environmental Baseline Survey Report for the Title Transfer of Land Parcel ED-4 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2008-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of a land parcel referred to as 'ED-4' (ED-4) at the U. S. Department of Energy's (DOE's) East Tennessee Technology Park (ETTP). DOE is proposing to transfer the title of this land to the Heritage Center, LLC. Parcel ED-4 is a land parcel that consists of two noncontiguous areas comprising a total of approximately 18 acres located east of the ETTP. The western tract of ED-4 encompasses approximately 8.5 acres in the northeastern quadrant of the intersection of Boulevard Road and Highway 58. The eastern tract encompasses an area of approximately 9.5 acres in the northwestern quadrant of the intersection of Blair Road and Highway 58 (the Oak Ridge Turnpike). Aerial photographs and site maps from throughout the history of the ETTP, going back to its initial development in the 1940s as the Oak Ridge Gaseous Diffusion Plant (ORGDP), indicate that this area has been undeveloped woodland with the exception of three support facilities for workers constructing the ORGDP since federal acquisition in 1943. These three support facilities, which were located in the western tract of ED-4, included a recreation hall, the Town Hall Camp Operations Building, and the Property Warehouse. A railroad spur also formerly occupied a portion of Parcel ED-4. These former facilities only occupied approximately 5 percent of the total area of Parcel ED-4. This report provides supporting information for the transfer of this government-owned property at ETTP to a non-federal entity. This EBS is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). In order to support a Clean Parcel Determination (CPD) in accordance with CERCLA Sect. 120(h)(4)(d), groundwater and sediment samples were collected within, and adjacent to, the Parcel ED-4 study area. The potential for DOE to make a CPD for ED-4 is further supported by a No Further Investigation (NFI) determination made on land that adjoins ED-4 to the east (DOE 1997a) and to the south (DOE 1997b).

  7. Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009

    SciTech Connect (OSTI)

    SAIC

    2009-05-01

    The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are included in the proposed ED-8 transfer. The buildings in ED-8 have already been transferred (Buildings K-1007, K-1580, K-1330, and K-1000). These buildings are not included in the transfer footprint of Land Parcel ED-8. A number of temporary structures, such as trailers and tents (non-real property), are located within the footprint. These temporary structures are not included in the transfer. DOE would continue to be responsible for any contamination resulting from DOE activities that is present on the property at the time of transfer but found after the date of transfer. The deed transferring the Property contains various restrictions and prohibitions on the use of the Property that are subject to enforcement pursuant to State Law Tennessee Code Annotated (T.C.A.) 68-212-225 and state real property law. These restrictions and prohibitions are designed to ensure protection of human health and the environment.

  8. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    1 East Tennessee Technology Park 3-1 3. East Tennessee Technology Park ETTP was originally built to the "East Tennessee Technology Park." Environmental management and remediation operations consist by the private sector) also became a major mission at ETTP. Reindustrialization allows private industry to lease

  9. Discovery Park Impact Network for Photovoltaic Technology

    E-Print Network [OSTI]

    Holland, Jeffrey

    Discovery Park Impact Network for Photovoltaic Technology NEED Discovery Park provides for Photovoltaic Technology (NPT). The NPT is designed to be a unique venue for industry-directed, university aims to become an international center of gravity for photovoltaic research that connects islands

  10. Lease of Land for the Development of a Research Park at Los Alamos...

    National Nuclear Security Administration (NNSA)

    Lease of Land for the Development of a Research Park at Los Alamos National Laboratory | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

  11. Mandatory Dedication of Park and Open Space Lands: The Situation in Texas. 

    E-Print Network [OSTI]

    Taylor, P. D.; Kamp, B. D.; Seymour, J. S.

    1979-01-01

    B-1228 MANDATORY DEDICATION OF PARK AND OPEN SPACE LANDS: THE SITUATION IN TEXAS P. D. Taylor, B. D. Kamp and J. S. Seymour* Introduction Dedication is a technique which allows land to be set apart for public use. It is the transfer of a land... easement for a public purpose such as streets. utility rights of way or parks. and dedi cation allows local governments to receive these lands without having to purchase them. In ef fect. dedication is often interpreted as a cost which a developer...

  12. Alameda Park 

    E-Print Network [OSTI]

    Unknown

    2011-09-05

    ...................................................................................................................................................24 Main Industries and Major Employers ..................................................................................................26 4. Land Use... .......................................................................................................................... 158 Introduction ................................................................................................................................................ 158 Vehicular Parking...

  13. U.S. House Committee on Natural Resources Subcommittee on National Parks, Forests and Public Lands

    E-Print Network [OSTI]

    Boynton, Walter R.

    U.S. House Committee on Natural Resources Subcommittee on National Parks, Forests and Public Lands assessments of the impacts of climate change. Notably, these include: the report Global Warming and the Free House, Global Climate Change Impacts in the United States. By the way, this last national assessment

  14. Recommendation 170: Remedial Investigation/Feasibility Study for East Tennessee Technology Park

    Broader source: Energy.gov [DOE]

    The ORSSAB Recommendation to DOE on a Remedial Investigation/Feasibility Study for East Tennessee Technology Park.

  15. Independent Oversight Inspection, East Tennessee Technology Park, Summary Report- May 2003

    Broader source: Energy.gov [DOE]

    Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park

  16. EA-2000: Proposed Land Transfer to Develop a General Aviation...

    Energy Savers [EERE]

    2000: Proposed Land Transfer to Develop a General Aviation Airport at the East Tennessee Technology Park Heritage Center, Oak Ridge, Tennessee EA-2000: Proposed Land Transfer to...

  17. Parking

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDid you notHeatMaRIEdioxideUser Careers/ResearchParking Parking Print

  18. Parking

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-11-02

    The Order defines policies and procedures governing the assignment, use, and management of parking spaces controlled by DOE/NNSA in the Forrestal Facility. Administrative changes have been made to update content. Canceled by DOE N 251.92. Cancels HQ O 344.1.

  19. Parking

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-11-02

    To define policies and procedures governing the assignment, use, and management of parking spaces controlled by the Department of Energy (DOE)/National Nuclear Security Agency (NNSA) in the Forrestal Facility. Cancels HQ O 344.1 Canceled by DOE N 251.92.

  20. Parking

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeeding access| Department ofStephen PSeptember|March Study2065 UnlimitedParking

  1. Using geographic information system (GIS) technology to study the impacts of roads on Canada’s national parks

    E-Print Network [OSTI]

    Seaby, Michael; Rivard, Don

    2003-01-01

    GEOGRAPHIC INFORMATION SYSTEM (GIS) TECHNOLOGY TO STUDY THElevel, Parks Canada employs GIS to support reporting on thedevelopment as an indicator. GIS is a critical technology

  2. On the Border in Everglades and Dry Tortugas: Identifying Federal Law Enforcement Perspectives on Response to Cuban Immigrant Landings in South Florida's National Parks 

    E-Print Network [OSTI]

    Bentley, Amanda

    2012-10-19

    (ICE), and the National Park Service (NPS). Each agency has its own mission regarding immigration, and conflicts have emerged regarding responsibilities and responses to immigrant landings. The purpose of this study was to identify federal law...

  3. Final Land Configuration for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Stegen, R. L.; Kapinos, J. M.; Wehner, J. P.; Snyder, B.; Davis, R. W.

    2006-07-01

    Closure of the Rocky Flats Environmental Technology Site (RFETS) has been completed. The future land use of the site is designated as a National Wildlife Refuge. A joint effort between Kaiser-Hill, Department of Energy, U.S. Fish and Wildlife Service, Environmental Protection Agency, State of Colorado, and other stakeholders was initiated to provide direction for developing the final land configuration. Through early identification of issues and developing mutually agreeable solutions, the final land configuration of the site was successfully completed. (authors)

  4. DOE Awards Contract for Decontamination & Decommissioning Project for the East Tennessee Technology Park

    Broader source: Energy.gov [DOE]

    Oak Ridge, Tenn. – As part of its ongoing commitment to cleaning up the legacy of the Cold War at sites across the weapons complex, the U.S. Department of Energy has awarded a contract for the remaining environmental cleanup at the East Tennessee Technology Park (ETTP) to URS | CH2M Oak Ridge, LLC.

  5. Beijing Ideal land Technology Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformation Beaufort County, SouthBeckerPark,EEDT Technology Trade

  6. Visitor Parking Parking Legend

    E-Print Network [OSTI]

    Erway, Jennifer

    Visitor Parking Parking Legend General Parking Faculty/Staff Parking Satellite/Freshman Lot Sophomore Parking Reserved Parking Off-Campus Parking (OC) Visitor/Off Campus Employee Parking Visitor Parking Winston-Salem First Church Vehicle Parking Only WFU-Owned Residential Theme Housing Call Boxes

  7. National Environmental Research Parks

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The National Environmental Research Parks are outdoor laboratories that provide opportunities for environmental studies on protected lands that act as buffers around Department of Energy (DOE) facilities. The research parks are used to evaluate the environmental consequences of energy use and development as well as the strategies to mitigate these effects. They are also used to demonstrate possible environmental and land-use options. The seven parks are: Fermilab National Environmental Research Park; Hanford National Environmental Research Park; Idaho National Environmental Research Park; Los Alamos National Environmental Research Park; Nevada National Environmental Research Park; Oak Ridge National Environmental Research Park; and Savannah River National Environmental Research Park. This document gives an overview of the events that led to the creation of the research parks. Its main purpose is to summarize key points about each park, including ecological research, geological characteristics, facilities, and available databases.

  8. Commercial Vehicle Parking In California: Exploratory Evaluation of the Problem and Possible Technology-Based Solutions

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan

    2007-01-01

    Dealing with Truck Parking Demands. National CooperativeAdequacy of Commercial Truck Parking Facilities – TechnicalAdequacy of Commercial Truck Parking Facilities – Technical

  9. Commercial Vehicle Parking in California: Exploratory Evaluation of the Problem and Possible Technology-Based Solutions

    E-Print Network [OSTI]

    Shaheen, Susan; Rodier, Caroline J.

    2007-01-01

    Drivers’ response to parking guidance and informationAdequacy of Commercial Truck Parking Facilities – TechnicalPartners for Adequate Parking Facilities Initiative Final

  10. Parking Legend General Parking

    E-Print Network [OSTI]

    Anderson, Paul R.

    Parking Legend General Parking Faculty/Staff Parking Satellite/Freshman Lot Sophomore Parking Reserved Parking Off-Campus Parking (OC) Visitor/Off Campus Employee Parking Visitor Parking Winston-Salem First Church Vehicle Parking Only WFU-Owned Residential Theme Housing Call Boxes (Emergency Phones) Z2

  11. Constrained trajectory optimization of a soft lunar landing from a parking orbit

    E-Print Network [OSTI]

    Hawkins, Alisa Michelle

    2005-01-01

    A trajectory optimization study for a soft landing on the Moon, which analyzed the effects of adding operationally based constraints on the behavior of the minimum fuel trajectory, has been completed. Metrics of trajectory ...

  12. Application of Remote Sensing Technology and Ecological Modeling of Forest Carbon Stocks in Mt. Apo Natural Park, Philippines 

    E-Print Network [OSTI]

    Leal, Ligaya Rubas

    2015-01-23

    This dissertation work explored the application of remote sensing technology for the assessment of forest carbon storage in Mt. Apo Natural Park. Biomass estimation is traditionally conducted using destructive sampling with high levels...

  13. Earth sheltered industrial/utility park. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    A proposed industrial park in Cumberland, Wisconsin is discussed. Planners identified 4 land use elements for the site. A concept feasibility study for the earth-covered industrial park, an analysis of energy flows within the Cumberland community, and a resource and technology assessment of biomass feedstocks for a possible community scale bioenergy facility are discussed. (MCW)

  14. New Technologies to Reclaim Arid Lands User's Manual

    SciTech Connect (OSTI)

    W. K. Ostler

    2002-10-01

    Approximately 70 percent of all U.S. military training lands are located in arid and semi-arid areas. Training activities in such areas frequently adversely affect vegetation, damaging plants and reducing the resilience of vegetation to recover once disturbed. Fugitive dust resulting from a loss of vegetation creates additional problems for human health, increasing accidents due to decreased visibility, and increasing maintenance costs for roads, vehicles, and equipment. Under conventional technologies to mitigate these impacts, it is estimated that up to 35 percent of revegetation projects in arid areas will fail due to unpredictable natural environmental conditions, such as drought, and reclamation techniques that were inadequate to restore vegetative cover in a timely and cost-effective manner. New reclamation and restoration techniques are needed in desert ranges to help mitigate the adverse effects of military training and other activities to arid-land environments. In 1999, a cooperative effort between the U.S. Department of Energy (DOE), the US. Department of Defense (DoD), and selected university scientists was undertaken to focus on mitigating military impacts in arid lands. As arid lands are impacted due to DoD and DOE activities, biological and soil resources are gradually lost and the habitat is altered. A conceptual model of that change in habitat quality is described for varying levels of disturbance in the Mojave Desert. As the habitat quality degrades and more biological and physical resources are lost from training areas, greater costs are required to return the land to sustainable levels. The purpose of this manual is to assist land managers in recognizing thresholds associated with habitat degradation and provide reclamation planning and techniques that can reduce the costs of mitigation for these impacted lands to ensure sustainable use of these lands. The importance of reclamation planning is described in this manual with suggestions about establishing project objectives, scheduling, budgeting, and selecting cost-effective techniques. Reclamation techniques include sections describing: (1) erosion control (physical, chemical, and biological), (2) site preparation, (3) soil amendments, (4) seeding, (5) planting, (6) grazing and weed control, (7) mulching, (8) irrigation, and (9) site protection. Each section states the objectives of the technique, the principles, an in-depth look at the techniques, and any special considerations as it relates to DoD or DOE lands. The need for monitoring and remediation is described to guide users in monitoring reclamation efforts to evaluate their cost-effectiveness. Costs are provided for the proposed techniques for the major deserts of the southwestern U.S. showing the average and range of costs. A set of decision tools are provided in the form of a flow diagram and table to guide users in selecting effective reclamation techniques to achieve mitigation objectives. Recommendations are provided to help summarize key reclamation principles and to assist users in developing a successful program that contributes to sustainable uses of DoD and DOE lands. The users manual is helpful to managers in communicating to installation management the needs and consequences of training decisions and the costs required to achieve successful levels of sustainable use. This users manual focuses on the development of new reclamation techniques that have been implemented at the National Training Center at Fort Irwin, California, and are applicable to most arid land reclamation efforts.

  15. Parking Lot Parking Lot

    E-Print Network [OSTI]

    California at San Diego, University of

    RussellLn. Hopkins Parking Structure Regents Road West Parking Lot P703 Regents Road East Parking Lot P704 Regents Road Northeast Parking Lot P705 Parking Gilman Parking Structure La Jolla Farms RoadPinesRd. RegentsRoad GeneseeAvenue Genesee Avenue NorthTorreyPinesRoad Pangea Dr. Pangea Parking Lot Voigt Drive

  16. Visitor Parking Parking Legend

    E-Print Network [OSTI]

    Anderson, Paul R.

    Only Satellite/Freshman Lot Sophomore Parking Reserved Parking Off-Campus Parking (OC) Visitor to park T1 D E T J H G F Q B C M N P A A portion of lot P will close every Friday at 4 p.m. 24 hourVisitor Parking Parking Legend General Parking Faculty/Staff Parking Employee Off-Campus Parking

  17. Science Park Science Park

    E-Print Network [OSTI]

    Koolen, Marijn

    Science Park Science Park Science Park Science Park Science Park Kruislaan Kruislaan Science Park SURFsara NLeSC Polder Anna Hoeve Telecity Matrix Innovation Center AUC AMOLF ARCNL UvA Faculty of Science Equinix Universum CWI UvA Oerknal Meet & Eat Maslow Spar ACE Venture Lab IXA ILCA NS Amsterdam Science

  18. Back to the Basics using Developing Technologies JT Land and Cattle LLC

    E-Print Network [OSTI]

    Back to the Basics using Developing Technologies #12;JT Land and Cattle LLC #12;#12;"Unfavorable;#12;#12;#12;Negligent Management? Resilient Management? #12;Back to the Basics using Developing Technologies #12

  19. Accessible Parking Motorcycle Parking

    E-Print Network [OSTI]

    Nanyes, Ollie

    Hartmann Center Comstock Hall Holmes Main Street Parking Deck Transitional Parking Lot Lovelace JobstNorth Accessible Parking Motorcycle Parking Visitors Commuter Student Resident Student Resident St & Staff University Vehicles © Bradley University · 06/18/14 Emergency Phone Parking Legend FIJI

  20. Orientation Parking Student Parking

    E-Print Network [OSTI]

    Anderson, Paul R.

    Orientation Parking Student Parking: The Student Parking Lot is located on the corner of Lockland Bridge, take the 1st left turn on to Lockland Avenue. The Student Parking Lot entrance on to Lockland Avenue (before I-40 Bridge). The Student Parking Lot entrance will be on the right. Once you have

  1. Environmental Assessment for Lease of Land for the Development of a Research Park at Los Alamos National Laboratory, Los Alamos, New Mexico - Final Document

    SciTech Connect (OSTI)

    N /A

    1997-10-07

    As part of its initiative to fulfill its responsibilities to provide support for the incorporated County of Los Alamos (the County) as an Atomic Energy Community, while simultaneously fulfilling its obligations to enhance the self-sufficiency of the County under authority of the Atomic Energy Community Act of 1955 and the Defense Authorization Act, the U.S. Department of Energy (DOE) proposes to lease undeveloped land in Los Alamos, New Mexico, to the County for private sector use as a research park. The Proposed Action is intended to accelerate economic development activities within the County by creating regional employment opportunities through offering federal land for private sector lease and use. As a result of the proposed land lease, any government expenditures for providing infrastructure to the property would be somewhat supplemented by tenant purchase of Los Alamos National Laboratory (LANL) expertise in research and development activities. The presence of a research park within LANL boundaries is expected to allow private sector tenants of the park to be able to quickly and efficiently call upon LANL scientific expertise and facility and equipment capabilities as part of their own research operations and LANL research personnel, in turn, would be challenged in areas complementary to their federally funded research. In this way a symbiotic relationship would be enjoyed by both parties while simultaneously promoting economic development for the County through new job opportunities at the Research Park and at LANL, new indirect support opportunities for the community at large, and through payment of the basic building space leases. A ''sliding-scale'' approach (DOE 1993) is the basis for the analysis of effects in this Environmental Assessment (EA). That is, certain aspects of the Proposed Action have a greater potential for creating adverse environmental effects than others; therefore, they are discussed in greater detail in this EA than those aspects of the action that have little potential for effect. The Proposed Action would result in an increase of as many as 1,500 new direct jobs and, as many as 2,565 indirect jobs could be created from the development of a research park. Lease of the tract would not reduce the size of LANL or change its site boundary. However, approximately 30 ac (12 ha) of a 60-ac (24-ha) tract would be changed from an undeveloped to a developed status. Under the No Action Alternative, no transfer or lease of Federal lands would occur. LANL would not have the benefit of its research personnel working on a variety of complementary research efforts beyond their federally funded responsibilities. No new jobs would be created from proposed development activities. Undeveloped lands would remain in their current condition. Two hypothetical accidents were analyzed that evaluated a potential chemical release and radiological doses to the public from hypothetical accidents at the proposed Research Park. Neither accident scenario resulted in potentially serious health effects for workers or the public at the proposed Research Park. The cumulative effects of the Proposed Action as well as reasonably foreseeable related actions could result in potential adverse health effects. Environmental effects would be limited to the loss of a small amount of wildlife habitat. Additional economic development would be expected to occur.

  2. Applying Integrated ITS Technologies to Parking Management Systems: A Transit-Based Case Study in the San Francisco Bay Area

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan A.; Eaken, Amanda M.

    2004-01-01

    model of the effects of parking guidance systems. 7 th WCTRDriver’s response to parking information systems: empirical1997). Drivers’ response to parking guidance and information

  3. Applying Integrated ITS Technologies to Parking Management Systems: A Transit-Based Case Study in the San Francisco Bay Area

    E-Print Network [OSTI]

    Shaheen, Susan; Rodier, Caroline J.; Eaken, Amanda M.

    2004-01-01

    14) Willson, R. (1997). Parking Pricing Without Tears: TripH. L. (1996). A dynamic parking reservation system for city1997). Drivers’ response to parking guidance and information

  4. Transition Plan for the K-1203 Sewage Treatment Plant, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Hoffmeister J.

    2008-10-05

    The K-1203 Sewage Treatment Plant (STP) was previously used to treat and process all sanitary sewage waste from the East Tennessee Technology Park (ETTP). The plant was shut down on May 29, 2008 as a result of the transition of sewage treatment for ETTP to the City of Oak Ridge. The City of Oak Ridge expanded the Rarity Ridge Sewage Treatment Plant (RRSTP) to include capacity to treat the waste from the ETTP and the Community Reuse Organization of East Tennessee (CROET) constructed a new ETTP lift station and force main to RRSTP. In preparation for the shutdown of K-1203, the US Department of Energy (DOE) in conjunction with Operation Management International (OMI) developed a shut down plan to outline actions that need to occur prior to the transition of the facility to Bechtel Jacob Company, LLC (BJC) for decontamination and demolition (D and D). This plan outlines the actions, roles, and responsibilities for BJC in order to support the transition of the K-1203 STP from OMI to the BJC Surveillance and Maintenance (S and M) and D and D programs. The D and D of the K-1203 Facilities is planned under the Comprehensive Environmental Response, Compensation, and Liability Act Remaining Facilities D and D Action Memorandum in the Balance of Site-Utilities D and D Subproject in fiscal year (FY) 2014.

  5. Smart Parking on Campus

    E-Print Network [OSTI]

    Shoup, Donald C

    2007-01-01

    3 Parking Anxiety . . . . . . . . . . . . . .21 Parking Cash Out . . . . . . . . . . . . . . . . .26 Honest Parking . . . . .

  6. INDEPENDENT VERIFICATION SURVEY REPORT FOR ZONE 1 OF THE EAST TENNESSEE TECHNOLOGY PARK IN OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    King, David A.

    2012-08-16

    Oak Ridge Associated Universities (ORAU) conducted in-process inspections and independent verification (IV) surveys in support of DOE's remedial efforts in Zone 1 of East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Inspections concluded that the remediation contractor's soil removal and survey objectives were satisfied and the dynamic verification strategy (DVS) was implemented as designed. Independent verification (IV) activities included gamma walkover surveys and soil sample collection/analysis over multiple exposure units (EUs).

  7. Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park, Summary Report, May 2003

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report provides the results of an inspection of environment, safety, and health and emergency management programs at the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP).

  8. Commercial Vehicle Parking In California: Exploratory Evaluation of the Problem and Possible Technology-Based Solutions

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan

    2007-01-01

    S. A, R. P. Haas, J. W. Trombly, R. H. Cross III, J. E.17, No. 2, pp. 89-104. Trombly, J.W. (2003). Dealing within truck parking spaces (Trombly, 2003). Shortages of public

  9. Commercial Vehicle Parking in California: Exploratory Evaluation of the Problem and Possible Technology-Based Solutions

    E-Print Network [OSTI]

    Shaheen, Susan; Rodier, Caroline J.

    2007-01-01

    of Transportation, 2005. 7. Trombly, J.W. Dealing with TruckS. A, R. P. Haas, J. W. Trombly, R. H. Cross III, J. E.truck parking problems (Trombly, 2003). Using “ITS to expand

  10. Vision for the University of Connecticut Technology Park Materials Discovery, Product Design & Development

    E-Print Network [OSTI]

    Lozano-Robledo, Alvaro

    · Additive Manufacturing and Nanoscale Processing · Fuel Cells, Sustainable Energy & Energy Management & Development and Advanced Manufacturing: Partnering with Industry to Accelerate Manufacturing Innovation for the Tech Park which will house the Connecticut Collaboratory for Materials & Manufacturing (C2M2

  11. Standard for IT Security Roles and Responsibilities Version 1.0 Office of Information Technology University of Maryland College Park Page 1

    E-Print Network [OSTI]

    Yorke, James

    Standard for IT Security Roles and Responsibilities ­ Version 1.0 Office of Information Technology University of Maryland ­ College Park Page 1 Information Technology Standard Document Title: Standard The Board of Regents' Information Technology policy and Section 12-112 of the Education article

  12. Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    RSI

    2008-03-01

    The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe the RAs performed in Zone 2. The Zone 2 ROD divided the Zone 2 area into 7 geographic areas and 44 EUs. To facilitate the DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was executed and completed in FY 2007 for the 11 EUs addressed in this document. The main body of this report describes both the DVS process and scope of work performed and the RAs completed. The scope and approach for performing DVS activities performed in FY 2007 that lead to action/no further action decisions are presented in Sects. 2 through 4. RAs performed in FY 2007 are presented in Sects. 5 through 10. Future land use is described in Sect. 11, and the status of all Zone 2 EUs as of this PCCR is presented in Sect. 12.

  13. Environmental Baseline Survey Report for the Title Transfer of Parcel ED-9 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2010-05-01

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) Parcel ED-9 at the East Tennessee Technology Park (ETTP). Parcel ED-9 consists of about 13 acres that DOE proposes to transfer to Heritage Center, LLC (hereafter referred to as 'Heritage Center'), a subsidiary of the Community Reuse Organization of East Tennessee (CROET). The 13 acres include two tracts of land, referred to as ED-9A (7.06 acres) and ED-9B (5.02 acres), and a third tract consisting of about 900 linear feet of paved road and adjacent right-of-way, referred to as ED-9C (0.98 acres). Transfer of the title to ED-9 will be by deed under a Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This report provides a summary of information to support the transfer of this government-owned property at ETTP to a non-federal entity.

  14. Phased Construction Completion Report for Bldg. K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2008-10-01

    This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

  15. Phased Construction Completion Report for Building K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Garland S.

    2008-03-01

    This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

  16. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

  17. Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

    SciTech Connect (OSTI)

    Schubert, A.L. [URS - CH2M Oak Ridge LLC, P.O. Box 4699, Oak Ridge, TN 37831-7294 (United States)] [URS - CH2M Oak Ridge LLC, P.O. Box 4699, Oak Ridge, TN 37831-7294 (United States)

    2013-07-01

    On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will have been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)

  18. Hearing on the Use of Hydrogen Fuel Cell Technology in the National Park Service

    E-Print Network [OSTI]

    Eggert, Anthony

    2004-01-01

    HEARING ON THE USE OF HYDROGEN FUEL CELL TECHNOLOGY IN THEHEARING ON THE USE OF HYDROGEN FUEL CELL TECHNOLOGY IN THEon hydrogen and hydrogen fuel cell vehicle technologies and

  19. Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2010-02-01

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

  20. Characterization of oil and gas reservoirs and recovery technology deployment on Texas State Lands

    SciTech Connect (OSTI)

    Tyler, R.; Major, R.P.; Holtz, M.H.

    1997-08-01

    Texas State Lands oil and gas resources are estimated at 1.6 BSTB of remaining mobile oil, 2.1 BSTB, or residual oil, and nearly 10 Tcf of remaining gas. An integrated, detailed geologic and engineering characterization of Texas State Lands has created quantitative descriptions of the oil and gas reservoirs, resulting in delineation of untapped, bypassed compartments and zones of remaining oil and gas. On Texas State Lands, the knowledge gained from such interpretative, quantitative reservoir descriptions has been the basis for designing optimized recovery strategies, including well deepening, recompletions, workovers, targeted infill drilling, injection profile modification, and waterflood optimization. The State of Texas Advanced Resource Recovery program is currently evaluating oil and gas fields along the Gulf Coast (South Copano Bay and Umbrella Point fields) and in the Permian Basin (Keystone East, Ozona, Geraldine Ford and Ford West fields). The program is grounded in advanced reservoir characterization techniques that define the residence of unrecovered oil and gas remaining in select State Land reservoirs. Integral to the program is collaboration with operators in order to deploy advanced reservoir exploitation and management plans. These plans are made on the basis of a thorough understanding of internal reservoir architecture and its controls on remaining oil and gas distribution. Continued accurate, detailed Texas State Lands reservoir description and characterization will ensure deployment of the most current and economically viable recovery technologies and strategies available.

  1. Hawai`i Hydrogen Power Park Hawai`i Natural Energy Institute | School of Ocean & Earth Science & Technology

    E-Print Network [OSTI]

    Hawai`i Hydrogen Power Park Hawai`i Natural Energy Institute | School of Ocean & Earth Science value of integrated hydrogen energy systems, operating in real-world environments. The Power Park`i #12;Hawai`i Hydrogen Power Park Hawai`i Natural Energy Institute | School of Ocean & Earth Science

  2. Reprinted from Advanced Planning Technology: Technological Achievements of the ARPA/Rome Laboratory Planning Ini-tiative (Austin Tate, editor), Menlo Park, California: AAAI Press, 1996, pp. 130-135.

    E-Print Network [OSTI]

    Reeves, Douglas S.

    Reprinted from Advanced Planning Technology: Technological Achievements of the ARPA/Rome Laboratory Planning Ini- tiative (Austin Tate, editor), Menlo Park, California: AAAI Press, 1996, pp. 130-135. Toward Rational Planning and Replanning Rational Reason Maintenance, Reasoning Economies, and Qualitative

  3. Landscaping and Parking Renovations

    Broader source: Energy.gov [DOE]

    Renovations to Federal facility landscaping and parking areas can provide opportunities for several renewable energy options, including geothermal heat pumps (GHP), solar water heating, photovoltaics (PV), and energy efficiency technologies.

  4. Free Parking Free Parking

    E-Print Network [OSTI]

    Hering, Milena

    Advisory & Counselling Service, FUSION P Car park P P P PP P P P P P P P P P P P P P P P P P FUSION Centre UK Biochar Research Centre Estates Electrical substation Estates Crew labs Biospace building SAC Biochemistry Fleeming Jenkin Building Electrical Engineering Labs and Workshop Block Alexander Graham Bell

  5. Environmental Baseline Survey Report for the Title Transfer of the K-792 Switchyard Complex at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2009-12-01

    This environmental baseline survey (EBS) documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-792 Switchyard Complex, which includes the former K-792 Switchyard, the K-79 1-B building, the K-796-A building, and the K-792 Northern Expansion Area located in the northwestern portion of the East Tennessee Technology Park (ETTP). The total area of the property is approximately 19.91 acres. DOE is proposing to transfer the title of this land area and buildings to the Heritage Center, LLC (Heritage Center), a subsidiary corporation of the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the transfer of this government-owned facility at ETTP to a non-federal entity. The area proposed for title transfer includes the former K-792 Switchyard, the K-792 Northern Expansion Area, Bldg. K-791-B, Bldg. K-796-A, and the underlying property known as the underlying fee. Located within the K-792 Switchyard footprint but not included in the transfer are Bldg. K-131 0-MP and Bldg. K- 131 0-MQ, two buildings owned by a private company that leases space in the northern portion of the Switchyard. The transfer footprint is bounded by Perimeter Road to the north and west, the parking area for Portal 8 to the south, and primarily the former K-792 Powerhouse Complex and Avenue 'U' North to the east; however, the eastern boundary along the Northern Expansion area has no physical features associated with it. Zone 2 remedial action objectives were developed by the DVS to support the future use of ETTP as a mixed-use commercial and industrial park. Therefore, remediation criteria were designed for the protection of the future industrial worker under the assumption the worker normally would not have the potential for exposure to soils at depths below 10 ft below ground surface (bgs). Accordingly, land use controls (LUCs) have been established to restrict disturbance of soils below 10 ft deep and to limit future land use to industriallcornmercial activities. Where the need for LUCs below 10 ft bgs is not warranted, this is so stated and explained. Once all actions associated with the DVS for Zone 1 and Zone 2 are completed and the data support it, there will be a re-evaluation with EPA and TDEC for the restriction on excavation below 10 ft. The DVS process and the preparation of this report included visual and physical inspections of the property and adjacent properties, a detailed records search, sampling and analysis of soils, radiological walkover surveys, and a risk evaluation. Resources evaluated as part of the records search included Federal Government records, title documents, aerial photographs that may reflect prior uses, and interviews with current and former employees 1 involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes were stored for one year or more, known to have been released, or disposed of. In addition, radiological surveys of Bldgs. K-791-B and K-796-A were conducted to assess the buildings radiological condition. Soil vapor sampling and polychlorinated biphenyl (PCB) swipe sampling also were conducted within the buildings. Based on the U. S. Department of Energy's (DOE's) review of the existing information, including discussions and interviews referenced herein, and evaluation of the data gathered in preparation of the environmental baseline survey (EBS) for the K-792 Switchyard Complex, DOE recommends the following: Due to the uncertainty associated with the nature of the on-site groundwater and the need to evaluate and possibly address groundwater in the future, DOE recommends that the transfer of the K-792 Switchyard Complex be achieved by a covenant deferral per the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) Sect. 120(h)(3)(c). Land use restrictions associated with the covenant deferral are described.

  6. The East Tennessee Technology Park Progress Report for the Tennessee Hazardous Waste Reduction Act for Calendar Year 1999

    SciTech Connect (OSTI)

    Bechtel Jacobs Company LLC

    2000-03-01

    This report is prepared for the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) (ETTP) in compliance with the ''Tennessee Hazardous Waste Reduction Act of 1990'' (THWRA) (TDEC 1990), Tennessee Code Annotated 68-212-306. Annually, THWRA requires a review of the site waste reduction plan, completion of summary waste reduction information as part of the site's annual hazardous waste reporting, and completion of an annual progress report analyzing and quantifying progress toward THWRA-required waste stream-specific reduction goals. This THWRA-required progress report provides information about ETTP's hazardous waste streams regulated under THWRA and waste reduction progress made in calendar year (CY) 1999. This progress report also documents the annual review of the site plan, ''Oak Ridge Operations Environmental Management and Enrichment Facilities (EMEF) Pollution Prevention Program Plan'', BJC/OR-306/R1 (Bechtel Jacobs Company 199a). In 1996, ETTP established new goal year ratios that extended the goal year to CY 1999 and targeted 50 percent waste stream-specific reduction goals. In CY 1999, these CY 1999 goals were extended to CY 2000 for all waste streams that generated waste in 1999. Of the 70 ETTP RCRA waste streams tracked in this report from base years as early as CY 1991, 51 waste streams met or exceeded their reduction goal based on the CY 1999 data.

  7. UH Parking Access & Mid-Pacific Institute

    E-Print Network [OSTI]

    Pacific Ocean Science & Technology Kuykendall Annex Information Technology Center Krauss Hall Holmes HallStairs Pond UH Parking Access & Mid-Pacific Institute Exit Dole Street Offices Multipurpose

  8. ``White Land``...new Russian closed-cycle nuclear technology for global deployment

    SciTech Connect (OSTI)

    Bowman, C.D.

    1996-07-01

    A Russian technology called ``White Land`` is being pursued which is based on their heavy-metal-cooled fast spectrum reactor technology developed to power their super-fast Alpha Class submarines. These reactors have important safety advantages over the more conventional sodium-cooled fast breeder reactors but preserve some of the attractive operational features of the fast spectrum systems. Perhaps chief among these advantages in the current political milieu is their ability to generate energy from any nuclide heavier than thorium including HEU, weapons plutonium, commercial plutonium, neptunium, americium, and curium. While there are several scenarios for deployment of these systems, the most attractive perhaps is containment in submarine-like enclosures to be placed underwater near a coastal population center. A Russian organization named the Alphabet Company would build the reactors and maintain title to them. The company would be paid on the basis of kilowatt-hours delivered. The reactors would not require refueling for 10--15 years and no maintenance violating the radiation containment would be required or would be carried out at the deployment site. The host country need not develop any nuclear technology or accept any nuclear waste. When the fuel load has been burned, the entire unit would be towed to Archangel, Russia for refueling. The fission product would be removed from the fuel by ``dry`` molten salt technology to minimize the waste stream and the fissile material would be returned to the reactor for further burning. The fission product waste would be stored at New Land Island, their current nuclear test site in the Arctic. If concerns over fission product justify it, the long-lived species will be transmuted in an accelerator-driven system. Apparently this project is backed at the highest levels of MINATOM and the Alphabet Company has the funding to proceed.

  9. Type B Accident Investigation, Subcontractor Employee Personal Protective Equipment Ignition Incident on February 18, 2003, at the East Tennessee Technology Park, Oak Ridge, Tennessee

    Broader source: Energy.gov [DOE]

    On February 18, 2003, a general laborer employed at the East Tennessee Technology Park (ETTP) by MACTEC Constructors, Inc. (MACTEC) was performing rebar removal with a gas-powered cut-off machine. MACTEC is a subcontractor to Bechtel Jacobs Company LL (BJC). The sparks from the cut-off machine ignited the right leg of his 100% cotton anticontamination (anti-c) coveralls and the plastic bootie.

  10. Converting Limbo Lands to Energy-Generating Stations: Renewable Energy Technologies on Underused, Formerly Contaminated Sites

    SciTech Connect (OSTI)

    Mosey, G.; Heimiller, D.; Dahle, D.; Vimmerstedt, L.; Brady-Sabeff, L.

    2007-10-01

    This report addresses the potential for using 'Limbo Lands' (underused, formerly contaminated sites, landfills, brownfields, abandoned mine lands, etc. ) as sites for renewable energy generating stations.

  11. Baseline Environmental Analysis Report for the K-1251 Barge Facility at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Van Winkle J.E.

    2007-08-24

    This report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-1251 Barge Facility, which is located at the East Tennessee Technology Park (ETTP). DOE is proposing to lease the facility to the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the use, by a potential lessee, of government-owned facilities at ETTP. This report is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The lease footprint is slightly over 1 acre. The majority of the lease footprint is defined by a perimeter fence that surrounds a gravel-covered area with a small concrete pad within it. Also included is a gravel drive with locked gates at each end that extends on the east side to South First Avenue, providing access to the facility. The facility is located along the Clinch River and an inlet of the river that forms its southern boundary. To the east, west, and north, the lease footprint is surrounded by DOE property. Preparation of this report included the review of government records, title documents, historic aerial photos, visual and physical inspections of the property and adjacent properties, and interviews with current and former employees involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products or their derivatives and acutely hazardous wastes were known to have been released or disposed. Radiological surveys were conducted and chemical samples were collected to assess the facility's condition.

  12. Land and Resource Management Issues Relevant to Deploying In-Situ Thermal Technologies

    SciTech Connect (OSTI)

    Keiter, Robert; Ruple, John; Tanana, Heather; Kline, Michelle

    2011-02-28

    Utah is home to oil shale resources containing roughly 1.3 trillion barrels of oil equivalent and our nation’s richest oil sands resources. If economically feasible and environmentally responsible means of tapping these resources can be developed, these resources could provide a safe and stable domestic energy source for decades to come. In Utah, oil shale and oil sands resources underlay a patchwork of federal, state, private, and tribal lands that are subject to different regulatory schemes and conflicting management objectives. Evaluating the development potential of Utah’s oil shale and oil sands resources requires an understanding of jurisdictional issues and the challenges they present to deployment and efficient utilization of emerging technologies. The jurisdictional patchwork and divergent management requirements inhibit efficient, economic, and environmentally sustainable development. This report examines these barriers to resource development, methods of obtaining access to landlocked resources, and options for consolidating resource ownership. This report also examines recent legislative efforts to wrest control of western public lands from the federal government. If successful, these efforts could dramatically reshape resource control and access, though these efforts appear to fall far short of their stated goals. The unintended consequences of adversarial approaches to obtaining resource access may outweigh their benefits, hardening positions and increasing tensions to the detriment of overall coordination between resource managers. Federal land exchanges represent a more efficient and mutually beneficial means of consolidating management control and improving management efficiency. Independent of exchange proposals, resource managers must improve coordination, moving beyond mere consultation with neighboring landowners and sister agencies to coordinating actions with them.

  13. Linking Institutional Characteristics to Communal Natural Resource Conservation in Cumbres de Monterrey National Park 

    E-Print Network [OSTI]

    Clifton, Kathryn Marie

    2014-05-08

    National parks in developing countries often have inhabitants that practice communal land management. Potential drivers for sustainable communal land management have been identified in literature, however these drivers ...

  14. Parking, People, and Cities

    E-Print Network [OSTI]

    Manville, Michael; Shoup, Donald

    2006-01-01

    are disregarded. The parking lot is where we stop thinkingthe car, however, the parking lot is the destination, anda building and its parking lot separately, but parking

  15. Smart Parking on Campus

    E-Print Network [OSTI]

    Shoup, Donald C

    2007-01-01

    for campus parking. SMART PARKING ON CAJVIPUS ADMINISTEREDSMART PARKING ON CAMPUS Donald Shoup Department of Urban41 SMART PARKING ON CAMPUS Donald Shoup Few institutions are

  16. ParkingEducation Week Parking DisabledParking

    E-Print Network [OSTI]

    Hart, Gus

    PARKING Direct shuttle service from the West Stadium Lot to the WSC and to the Marriott Center between the perimeter parking lots and the main cam- pus at regular intervals . large detailed mapsSAB IPF Education Week ParkingEducation Week Parking Education Week Parking Education Week Parking

  17. How emissions, climate, and land use change will impact mid-century air quality over the United States: a focus on effects at national parks

    E-Print Network [OSTI]

    Val Martin, M.

    We use a global coupled chemistry–climate–land model (CESM) to assess the integrated effect of climate, emissions and land use changes on annual surface O[subscript 3] and PM[subscript 2.5] in the United States with a focus ...

  18. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Peru Mill Industrial Park in the City of Deming, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Peru Mill Industrial Park site in the City of Deming, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  19. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Sky Park Landfill Site in Eau Claire, Wisconsin. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  20. EA-1212: Lease of Land for the Development of a Research Park at Los Alamos National Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to lease undeveloped land that is part of the U.S. Department of Energy's Los Alamos National Laboratory in Los Alamos, New Mexico, to...

  1. Highlighting High Performance: Twenty River Terrace: Battery Park City, New York. Office of Building Technology, State and Community Programs (BTS) Brochure

    SciTech Connect (OSTI)

    None

    2002-08-01

    Case study on high performance building features of the Twenty River Terrace, Battery Park City building.

  2. System Description for the K-25/K-27 D&D Project Polyurethane Foam Delivery System, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Boris, G.

    2008-02-21

    The Foam Delivery System used in the decontamination and decommissioning (D&D) project for the K-25/K-27 Buildings at the East Tennessee Technology Park (ETTP) is comprised of a trailer-mounted Gusmer{reg_sign} H20/35 Pro-TEC Proportioning Unit and the associated equipment to convey electrical power, air, and foam component material to the unit. This high-pressure, plural-component polyurethane foam pouring system will be used to fill process gas and non-process equipment/piping (PGE/P) within the K-25/K-27 Buildings with polyurethane foam to immobilize contaminants prior to removal. The system creates foam by mixing isocyanate and polyol resin (Resin) component materials. Currently, the project plans to utilize up to six foaming units simultaneously during peak foaming activities. Also included in this system description are the foam component material storage containers that will be used for storage of the component material drums in a staging area outside of the K-25/K-27 Buildings. The Foam Delivery System and foam component material storage enclosures (i.e., Foaming Component Protective Enclosures) used to store polymeric methylene diphenyl diisocyanate (PMDI) component material are identified as Safety Significant (SS) Structures, Systems and Components (SSC) in the Documented Safety Analysis (DSA) for the project, Documented Safety Analysis for the K-25 and K-27 Facilities at the East Tennessee Technology Park, Oak Ridge, Tennessee, DSA-ET-K-25/K-27-0001.

  3. Energy and greenhouse gas emission effects of corn and cellulosic ethanol with technology improvements and land use changes.

    SciTech Connect (OSTI)

    Wang, M.; Han, J.; Haq, Z; Tyner, .W.; Wu, M.; Elgowainy, A.

    2011-05-01

    Use of ethanol as a transportation fuel in the United States has grown from 76 dam{sup 3} in 1980 to over 40.1 hm{sup 3} in 2009 - and virtually all of it has been produced from corn. It has been debated whether using corn ethanol results in any energy and greenhouse gas benefits. This issue has been especially critical in the past several years, when indirect effects, such as indirect land use changes, associated with U.S. corn ethanol production are considered in evaluation. In the past three years, modeling of direct and indirect land use changes related to the production of corn ethanol has advanced significantly. Meanwhile, technology improvements in key stages of the ethanol life cycle (such as corn farming and ethanol production) have been made. With updated simulation results of direct and indirect land use changes and observed technology improvements in the past several years, we conducted a life-cycle analysis of ethanol and show that at present and in the near future, using corn ethanol reduces greenhouse gas emission by more than 20%, relative to those of petroleum gasoline. On the other hand, second-generation ethanol could achieve much higher reductions in greenhouse gas emissions. In a broader sense, sound evaluation of U.S. biofuel policies should account for both unanticipated consequences and technology potentials. We maintain that the usefulness of such evaluations is to provide insight into how to prevent unanticipated consequences and how to promote efficient technologies with policy intervention.

  4. World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

    SciTech Connect (OSTI)

    Haynes, Ray; Hirschy, Anita

    2013-07-01

    On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing the project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)

  5. LED Parking Lot Lighting Working Group Fact Sheet

    SciTech Connect (OSTI)

    2008-10-01

    This fact sheet describes the Retailer Energy Alliance LED Parking Lot Lighting Working Group and its Technology Procurement Project.

  6. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) from unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.

  7. Examining the Proximate and Underlying Causes of Tropical Deforestation: Migration and Land Use in the Sierra de Lacandn National Park, Guatemala1

    E-Print Network [OSTI]

    Lopez-Carr, David

    1 Examining the Proximate and Underlying Causes of Tropical Deforestation: Migration and Land Use-farm") resource use, while population scholars have largely ignored rural-to-rural migration. The way in which in another place has been inadequately explored. This paper investigates the primary proximate and underlying

  8. Parking Reform Made Easy

    E-Print Network [OSTI]

    Willson, Richard

    2013-01-01

    decide to adopt lower parking requirements, or to eliminateeconomic goals may embrace parking deregulation because itEngineers. 2010. Parking Generation, 4th Edition, Washington

  9. Curbside Parking Time Limits

    E-Print Network [OSTI]

    Arnott, Richard; Rowse, John

    2009-01-01

    J. Rowse. 1999. Modeling parking. Journal of Urban Economicsand J. Rowse. 2009. Downtown parking in auto city. RegionalThe economics of pricing parking. Journal of Urban Economics

  10. Parking by Design

    E-Print Network [OSTI]

    Kevin Holliday

    2004-01-01

    to expand Carolyn H. Krasnow, Walker Parking Consultants. “Parking OccupancyStudy Update: Parking District 1, Prepared for the City of

  11. Cruising for Parking

    E-Print Network [OSTI]

    Shoup, Donald

    2007-01-01

    cruise. Because its curb parking is underpriced, Westwoodyear. And because its curb parking is value-priced, Redwoodthe right price for curb parking and spend the resulting

  12. People, Parking, and Cities

    E-Print Network [OSTI]

    Manville, Michael; Shoup, Donald

    2004-01-01

    Trouble with Minimum Parking Requirements,” TransportationThe High Cost of Free Parking, forthcoming from The Plannerslimit rather than require parking. Perhaps the simplest and

  13. Curbside Parking Time Limits

    E-Print Network [OSTI]

    Arnott, Richard; Rowse, John

    2011-01-01

    J. Rowse. 1999. Modeling parking. Journal of Urban Economicsand J. Rowse. 2009. Downtown parking in auto city. RegionalThe economics of pricing parking. Journal of Urban Economics

  14. Earth-sheltered industrial utility park. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    The potential to develop the Cumberland (Wisconsin) industrial park site using earth-integrated techniques is discussed. The concept feasibility study concerned the site, the land-use plan, and building types. An assessment of energy use in the Cumberland community for 1979 and 1980 was made by compiling sales data from the various suppliers of gasoline, diesel, electricity, natural gas, and other fuels. A resource and technology assessment of biomass feedstocks for a possible community scale bioenergy facility was made. Details of each element of the study are presented and conclusions are summarized. (MCW)

  15. ENVIRONMENTAL BASELINE SURVEY REPORT FOR WEST BLACK OAK RIDGE, EAST BLACK OAK RIDGE, MCKINNEY RIDGE, WEST PINE RIDGE, AND PARCEL 21D IN THE VICINITY OF THE EAST TENNESSEE TECHNOLOGY PARK, OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    David A. King

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy’s (DOE’s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. The goal is to obtain all media no-further-investigation (NFI) determinations for the subject parcels considering existing soils. To augment the existing soils-only NFI determinations, samples of groundwater, surface water, soil, and sediment were collected to support all media NFI decisions. The only updates presented here are those that were made after the original issuance of the NFI documents. In the subject parcel where the soils NFI determination was not completed for approval (Parcel 21d), the full process has been performed to address the soils as well. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only NFI reports. Groundwater sampling was also conducted to support a Parcel 21d decision.

  16. Minimizing the Cost of Innovative Nuclear Technology Through Flexibility: The Case of a Demonstration Accelerator-Driven Subcritical Reactor Park

    E-Print Network [OSTI]

    Cardin, Michel-Alexandre; Steer, Steven J.; Nuttall, William J.; Parks, Geoffrey T.; Gonçalves, Leonardo V. N.; de Neufville, Richard

    Presented is a methodology to analyze the expected Levelised Cost Of Electricity (LCOE) in the face of technology uncertainty for Accelerator-Driven Subcritical Reactors (ADSRs). It shows that flexibility in the design and deployment strategy...

  17. PARKING MAP Sales Office

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    PARKING MAP BayDr. Main Entrance Parking Sales Office Main Entrance Kiosk East Remote Lot Parking Transit Stop Traffic Signal PARTIAL OR FULL LOT CLOSURE Stevenson Lot 110 Crown Lot 111 Merrill student parking C--close-in parking for undergraduate students (lot-specific) EV--charging for electric

  18. visitor parking rice village

    E-Print Network [OSTI]

    Aazhang, Behnaam

    H West Lot 5 Founder's Court Visitor Lot visitor parking faculty, staff, student, contract parking's court John and Anne Grove visitor parking North Lot N Bike Track MEMORIAL HERMANN AT 6400 FANNIN ST Accessible Parking Parking Lots: APB Alice Pratt Brown Hall Lot B Baker College­Housing & Dining Lot BG

  19. Cruising for Parking

    E-Print Network [OSTI]

    Shoup, Donald C.

    2006-01-01

    travel as related to local parking. in: Proceedings of theshort-term on-street parking. Socio-Economic PlanningThe High Cost of Free Parking. Planners Press, Chicago.

  20. Parking, People, and Cities

    E-Print Network [OSTI]

    Manville, Michael; Shoup, Donald

    2006-01-01

    R. ?1998?. “The downtown parking syndrome: Does curing the?1966?. Transportation and parking for to- morrow’s cities;C. ?1940?. “Off-street parking: A city planning problem. ”

  1. Parking Without Paying

    E-Print Network [OSTI]

    Manville, Michael; Williams, Jonathan

    2013-01-01

    Exemption and Market-Priced Parking,” originally publishedParking without Paying MICHAEL MANVILLE AND J O N AT H A N WChicago famously leased its parking meters to a private

  2. English Country Dance 2015 Parking in Oak Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Parking in Oak Park Due to major construction, parking for the Oak Park dances is a bit challenging, so please allow yourself a little more time and patience. Below are parking...

  3. KU Parking &Transit | 1501 Irving Hill Road | Lawrence, KS 66045 | (785) 864-PARK | Fax: (785) 864-5220 | parking.ku.edu | kupark@ku.edu 2014-2015 Parking Regulations

    E-Print Network [OSTI]

    ; and maximize parking area consistent with land needs for the academic function, topography, financial through the sale of permits, fines, and other user fees. It receives no income from state or tuition funds

  4. KU Parking &Transit | 1501 Irving Hill Road | Lawrence, KS 66045 | (785) 864-PARK | Fax: (785) 864-5220 | parking.ku.edu | kupark@ku.edu 2015-2016 Parking Regulations

    E-Print Network [OSTI]

    ; and maximize parking area consistent with land needs for the academic function, topography, financial through the sale of permits, fines, and other user fees. It receives no income from state or tuition funds

  5. Water Resources and Climate Change in Garden Park, Colorado

    E-Print Network [OSTI]

    Baffa, Thomas W.

    2009-12-18

    This paper examines whether groundwater can provide adequate water supplies for land use change and future development in Garden Park, Colorado. A climatic water budget model was used to determine the amount and adequacy of the groundwater supply...

  6. March 19, 2013 Webinar: Renewable Energy Parks

    Office of Energy Efficiency and Renewable Energy (EERE)

    This webinar was held March 19, 2013, and provided information on how two cities in Washington and New York integrated multiple renewable energy technologies to create renewable energy parks in...

  7. 10-12 September 2014 Discovery Park

    E-Print Network [OSTI]

    10-12 September 2014 Discovery Park Purdue University WestLafayette,Indiana For more information industry decision makers about theroleoffoodsystemsinachievingsustainablenutritionsecurity from governments, private industry and academia? · What technologies, approaches and mechanisms

  8. Application of satellite and GIS technologies for land-cover and land-use mapping at the rural-urban fringe - A case study

    SciTech Connect (OSTI)

    Treitz, P.M.; Howarth, P.J.; Gong, Peng )

    1992-04-01

    SPOT HRV multispectral and panchromatic data were recorded and coregistered for a portion of the rural-urban fringe of Toronto, Canada. A two-stage digital analysis algorithm incorporating a spectral-class frequency-based contextual classification of eight land-cover and land-use classes resulted in an overall Kappa coefficient of 82.2 percent for training-area data and a Kappa coefficient of 70.3 percent for test-area data. A matrix-overlay analysis was then performed within the geographic information system (GIS) to combine the land-cover and land-use classes generated from the SPOT digital classification with zoning information for the area. The map that was produced has an estimated interpretation accuracy of 78 percent. Global Positioning System (GPS) data provided a positional reference for new road networks. These networks, in addition to the new land-cover and land-use map derived from the SPOT HRV data, provide an up-to-date synthesis of change conditions in the area. 51 refs.

  9. Student Parking Faculty/Staff

    E-Print Network [OSTI]

    Maroncelli, Mark

    A Student Parking LOT K Student Parking LOT B Faculty/Staff Parking LOT C Fac/Staff Parking LOT F Student Parking LOT H Student Parking LOT J Faculty/Staff Parking LOT G Student Parking LOT D Visitor/Staff Parking LOT E Fac/Staff/Visitor Parking U N I V E R S I T Y D R U N I V ER SITY DR S U S Q U E H A N N A B

  10. LED Provides Effective and Efficient Parking Area Lighting at...

    Office of Environmental Management (EM)

    Efficient Parking Area Lighting at the NAVFAC Engineering Service Center Document details new lighting technology that reduces energy consumption and reduces maintenance, while...

  11. Environmental baseline survey report for West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge and parcel 21D in the vicinity of the East Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    King, David A.

    2012-11-29

    This environmental baseline survey (EBS) report documents the baseline environmental conditions of five land parcels located near the U.S. Department of Energy?s (DOE?s) East Tennessee Technology Park (ETTP), including West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, West Pine Ridge, and Parcel 21d. Preparation of this report included the detailed search of federal government records, title documents, aerial photos that may reflect prior uses, and visual inspections of the property and adjacent properties. Interviews with current employees involved in, or familiar with, operations on the real property were also conducted to identify any areas on the property where hazardous substances and petroleum products, or their derivatives, and acutely hazardous wastes may have been released or disposed. In addition, a search was made of reasonably obtainable federal, state, and local government records of each adjacent facility where there has been a release of any hazardous substance or any petroleum product or their derivatives, including aviation fuel and motor oil, and which is likely to cause or contribute to a release of any hazardous substance or any petroleum product or its derivatives, including aviation fuel or motor oil, on the real property. A radiological survey and soil/sediment sampling was conducted to assess baseline conditions of Parcel 21d that were not addressed by the soils-only no-further-investigation (NFI) reports. Groundwater sampling was also conducted to support a Parcel 21d decision. Based on available data West Black Oak Ridge, East Black Oak Ridge, McKinney Ridge, and West Pine Ridge are not impacted by site operations and are not subject to actions per the Federal Facility Agreement (FFA). This determination is supported by visual inspections, records searches and interviews, groundwater conceptual modeling, approved NFI reports, analytical data, and risk analysis results. Parcel 21d data, however, demonstrate impacts from site operations, specifically as associated with lead in surface soil at the abandoned water tank and nickel in surface soils over the northern portion of the parcel from former Bldg. K-1037 smelting operations. Low level detections of organics are also reported in some surface soils including Polycyclic aromatic hydrocarbons (PAHs) near Blair Road and common laboratory contaminants at randomly distributed locations. However, human health risk from site-related contaminants of potential concern (COPCs) are acceptable?though maximum concentrations of lead and nickel and the screening-level ecological risk assessment (SLERA) demonstrate no further ecological evaluation is warranted. The weight of evidence leads to the conclusion Parcel 21d does not require any actions per the FFA.

  12. PARKING MAP Sales Office

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    PARKING MAP BayDr. Main Entrance Parking Sales Office Main Entrance Kiosk East Remote Lot for details DMV Parking Transit Stop Traffic Signal PARTIAL OR FULL LOT CLOSURE Crown Lot 111 Kresge Lot 147M--close-in parking for undergraduate students (lot-specific) EV--charging for electric vehicles MC

  13. STATEMENT OF RECONCILIATION AND COMMITMENT Curtin University of Technology commits itself wholly to a vision of "a united Australia which respects this land

    E-Print Network [OSTI]

    Mucina, Ladislav

    STATEMENT OF RECONCILIATION AND COMMITMENT Curtin University of Technology commits itself wholly to a vision of "a united Australia which respects this land of ours; values the Aboriginal and Torres Strait. Accordingly we reaffirm our commitment to cultural diversity including an informed respect for indigenous

  14. Engineering Evaluation Report on K-311-1 Floor Subsidence (2008 Annual Report) at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Knott R.B.

    2008-11-13

    The purpose of this task is to evaluate the effect of floor settlement on building structure, piping, and equipment foundations between column lines 1 and 2 and B and K of Bldg. K-311-1 (see Fig. A-1 in Appendix A) at East Tennessee Technology Park (ETTP), Oak Ridge, Tennessee. Revision 0 of this document covers the 2005 annual inspection. Revision 1 addresses the 2006 annual inspection, Revision 2 addresses the 2007 annual inspection, and Revision 3 covers the 2008 annual inspection, as indicated by the changed report title. A civil survey and visual inspection were performed. Only a representative number of points were measured during the 2008 survey. The exact location of a number of survey points in Table A-1 could not be accurately determined in the 2008 survey since these points had not been spray painted since 2003. The points measured are deemed adequate to support the conclusions of this report. Based on the survey and observations, there has been no appreciable change in the condition of the unit since the 2007 inspection. The subsidence of the floor presents concerns to the building structure due to the possible indeterminate load on the pipe gallery framing. Prior to demolition activities that involve the piping or removal of the equipment, such as vent, purge and drain and foaming, engineering involvement in the planning is necessary. The piping connected to the equipment is under stress, and actions should be implemented to relieve this stress prior to disturbing any of the equipment or associated piping. In addition, the load on the pipe gallery framing needs to be relieved prior to any activities taking place in the pipe gallery. Access to this area and the pipe gallery is not allowed until the stress is released.

  15. Inspection of Environment, Safety, and Health Management at the Oak Ridge Operations Office and East Tennessee Technology Park- Volume I, May 2003

    Broader source: Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy (DOE) East Tennessee Technology Park (ETTP) site in April-May 2003. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. This volume discusses the results of the review of the ETTP ES&H programs. The results of this OA inspection indicate that work remains to address a number of deficiencies in ISM processes and implementation of those processes. However, the results of this inspection also indicate that ETTP has made significant progress in the past three years in addressing systemic deficiencies. Section 2 of this volume provides an overall discussion of the results of the review of the ETTP ES&H programs, including positive aspects and weaknesses. Section 3 provides OA’s conclusions regarding the overall effectiveness of OR and ETTP management of the ES&H programs. Section 4 presents the ratings assigned during this review. Appendix A provides supplemental information, including team composition. Appendix B identifies the specific findings that require corrective action and follow-up. Appendix C presents the results of the review of selected guiding principles of ISM. Appendix D presents the results of the review of the OR and contractor feedback and continuous improvement processes. Appendices E and F provide the results of the review of the application of the core functions of ISM for the selected BJC and BNFL activities, respectively.

  16. Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Rigsby V.P.

    2009-02-12

    In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Bui

  17. Preliminary Assessment SHALLOW LAND DISPOSAL AREA, PARKS

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ............................................................................................................................................1 2.0 SITE DESCRIPTION, OPERATIONAL HISTORY AND WASTE CHARACTERISTICS....2 2.1 LOCATION........................................................................................................................................2 2.3 OPERATIONAL HISTORY AND WASTE CHARACTERISTICS ......................................................................................................................................................13 DOE LETTER 25 MAY 2000

  18. Mojave National Preserve Joshua Tree National Park

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Forest (SBNF) Angeles National Forest (ANF) Cleveland National Forest (CNF) CNF CNF SBNF ANF CACA 049111°0'0"N 34°0'0"N 34°0'0"N 33°0'0"N 33°0'0"N California Desert Conservation Area BLM Solar Energy Project Contingent Corridor Deleted Corridor Land Status BLM National Park Service Forest Service Military USFWS

  19. Constructing use in surface parking lots : strategies for enhancing lots as part-time public spaces

    E-Print Network [OSTI]

    Ziegenfuss, Kathleen Kane

    2009-01-01

    Surface parking lots occupy vast amounts of land in urbanized areas-at times covering up to 40% of land in downtown areas in the United States. It is estimated that there are seven parking spaces for every vehicle in the ...

  20. The Practice of Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald C.

    2006-01-01

    of the developers' desire to provide more parking. 2.Put all their parking underground.3. Reduce parking demand before they are allowed to increase

  1. THE ACCESS ALMANAC - Parking Charity

    E-Print Network [OSTI]

    Shoup, Donald

    2014-01-01

    1243–1248. Eric Klein. 2010. “Parking Holiday Approved for8. Brandon Mathis. 2013. “Free Parking Downtown Not Loved byto Offer Free Downtown Parking for Two Weeks before

  2. In Lieu of Required Parking

    E-Print Network [OSTI]

    Shoup, Donald C.

    2001-01-01

    1997. Stadium Expansion Parking Plan and TransportationR. , and H . Levinson. 1990. Parking, Westport, Conn. : EnoWillson, R. 1995. Suburban parking requirements: A tacit

  3. Smarter Parking at Transit Stations

    E-Print Network [OSTI]

    Shaheen, Susan; Kemmerer, Charlene

    2007-01-01

    The High Cost of Free Parking (Chicago, Illinois: Americanand Amanda Eaken. Smart Parking Management Field Test: A BayTransit (BART) District Parking Demonstration—Phase One

  4. Are TODs Over-Parked?

    E-Print Network [OSTI]

    Cervero, Robert; Adkins, Arlie; Sullivan, Cathleen

    2009-01-01

    J. and Bianco, M. 1997. Parking Policies and CommutingThe High Cost of Free Parking. Chicago: Planner’s Press.Between the Regulations : Parking Requirements, Planners'

  5. Free Parking or Free Markets

    E-Print Network [OSTI]

    Shoup, Donald

    2011-01-01

    realize that minimum parking requirements were a poisonedchalice, providing ample free parking while hiding the manyThe High Cost of Free Parking, revised edition, Chicago:

  6. Review: Manufacturing National Park Nature

    E-Print Network [OSTI]

    Mason, Fred

    2012-01-01

    Review: Manufacturing National Park Nature: Photography,Canada Cronin, J. Keri. Manufacturing National Park Nature:J. Keri Cronin’s book Manufacturing National Park Nature

  7. Review: Manufacturing National Park Nature

    E-Print Network [OSTI]

    Mason, Fred

    2012-01-01

    tourist industry photos of Jasper National Park maintainedwilderness industry, how recreational activities in the parkPark Nature: Photography, Ecology and the Wilderness Industry

  8. Sandia Science & Technology Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of rare Kaonforsupernovae modelsearch this site Sandia Science &

  9. Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

    SciTech Connect (OSTI)

    Cusick, Lesley T. [Restoration Services, Inc. (United States)] [Restoration Services, Inc. (United States)

    2013-07-01

    When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

  10. THE UNIVERSITY OF EDINBURGH. Paterson's Land.

    E-Print Network [OSTI]

    Edinburgh, University of

    . Page 9. Internal Access. Page 13. Reception. Page 14. Lift. Page 14. Platform Lifts. Page 15. Stairs staff, students, visitors and contractors. The main Holyrood Campus car park is located off St John Street, to the rear of Paterson's Land (see location map). This is a one way car park which is accessed

  11. Selected Parking Types Resident Parking,Permit Required

    E-Print Network [OSTI]

    Chen, Tsuhan

    Lot Night/Weekend Restricted Permit Area 10 Minute Parking,No Permit Required Parkmobile Pay-by-Cell Parking Lot North Campus B Lot Sage Hall Campus-to-Campus Stops A B C ©2013This map replaces previous Selected Parking Types Resident Parking,Permit Required Commuter Parking,Permit Required Metered Parking

  12. University Parking & Transportation Services

    E-Print Network [OSTI]

    Portman, Douglas

    for that day. #12;3-D (Three Deep) parking in Lot 1 accommodates approximately 1/3 more vehicles in a parking. There will be Parking Attendants overseeing Lot 1 Monday through Friday, to assist parkers into the lot, move Row 1 vehicles when necessary and monitor the lot. What Is 3-D Parking? Row 2 & 3 ParkersRow 1 Parkers Row 2

  13. Supplemental Radiological Survey Plan for the Lease of the Rooms Associated with C107 of Building K-1006 at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Blevins M.F.

    2010-09-01

    In 1998, a portion of Bldg. K-1006 was leased to the Community Reuse Organization of East Tennessee (CROET) as part of the reindustrialization efforts at the East Tennessee Technology Park (ETTP). The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include rooms C107, C107-A, C107-B, C107-C, and C107-D. The lease of these rooms is now desired. These rooms comprise the area to be surveyed. The building was constructed as a laboratory facility to support the gaseous diffusion uranium enrichment process. It also contains offices and administrative spaces for laboratory personnel. After the gaseous diffusion process was shut down in the mid-1980s, the building was used to provide research and development support to ETTP environmental, safety, and health programs; the Toxic Substances Control Act Incinerator; the Central Neutralization Facility; and other multi-site waste treatment activities. It also served as the chemistry laboratory for the Environmental Technology Technical Services Organization. The activities currently conducted in Bldg. K-1006 utilize a variety of analytical techniques. Some of the major techniques being employed are X-ray analysis, electron microanalysis, and spectrochemical analysis. In 1998, a portion of Bldg. K-1006 was leased to CROET as part of the reindustrialization efforts at ETTP. The facility was subleased and is being used as an analytical laboratory. The 1998 lease did not include Rooms C107, C107-A, C107-B, C107-C, and C107-D. Some demolition of furniture and decontamination activities has taken place for Rooms C 107 and C 107-B since the last radiological survey of those rooms. In March 2009, a final remedial action (RA) was performed for the Bldg. K-1006 north basement sump. The Bldg. K-1006 north basement sump is a nominal 30-in.-diameter, 36-in.-deep concrete structure in the north corner of room C107B. The building receives groundwater in-leakage that is periodically pumped to the sewer system via this float-controlled pump. Solids in the bottom of the sump consisted of an estimated 1-ft{sup 3} coarse-grained material that varied in thickness from 0 to 4 in. with no suspended fraction. The RA consisted of removing the water in the sump and then removing and sampling the solids. The solids were mixed with grout after removal and allowed to set. The solids were then disposed off-site at an approved disposal facility. The building sump will remain until the K-1006 building is demolished. The actions for the K- 1006 sump are described in the revised Phased Construction Completion Report for Exposure Unit (EU) Z2-33, which received regulatory approval in December 2009.

  14. PARKING AND BACKING BASICS

    E-Print Network [OSTI]

    Kirschner, Denise

    PARKING AND BACKING BASICS BACK TO BASICS: YOUR KEYS TO SAFE DRIVING DRIVE SAFELY WORK WEEK in parking lots. Safe parking and backing is an important basic for all driver groups to master. GET BASICS GOT KIDS OR GRANDKIDS? ·It is estimated that backing over pedestrians causes 45% of non- traffic

  15. Nanoscience for Energy Technology and Sustainability

    E-Print Network [OSTI]

    Giger, Christine

    Nanoscience for Energy Technology and Sustainability Research Profile Prof. Park's Professorship issues of future energy & environmen- tal sustainability. Five strategic foci of Prof. Park's group of Energy Technology focuses on fundamental nanoscience for energy and clean technology applications

  16. Urban Parks: Constraints on Park Visitation 

    E-Print Network [OSTI]

    Scott, David

    2006-12-19

    Research shows that women, older people, members of some ethnic groups, and people with low educational and income levels are less likely than others to participate in leisure activities or visit parks. This publication explores the constraints...

  17. OVERFLOWLOTPublicParking Savannah Visitor Information

    E-Print Network [OSTI]

    Hutcheon, James M.

    OVERFLOWLOTPublicParking Savannah Visitor Information Center Parking Lot PARKING FEES APPLY UPPERLOT ParkingParking for patrons in the Coastal Georgia Center Parking lots is free, and a parking pass is not needed. If the upper and lower Coastal Georgia Center parking lots are full, free parking is available

  18. Handicapped Parking Guidance

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Headquarters Handicapped Parking Procedures It is the policy of the Department of Energy (DOE) that its parking facility be operated in a manner responsive to the needs of the Department, and for the maximum benefit of its employees. Individuals with temporary or permanent mobility impairment who, because of their condition, have a need to request a handicapped parking permit for the Forrestal or Germantown facilities, should use the following procedures

  19. Moongyu Park's Recent Papers

    E-Print Network [OSTI]

    ... S. Yoo and M.Park) "Analyzing the Propagation of Network Multi-Malwares Worm attack considering security countermeasure", Cyber Security and Information ...

  20. Terry Land

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar FuelTechnologyTel: Name: Rm. Tel: Location:TerrachanicsTerry Land

  1. National forests and public lands of Nevada Enhancement Act of 1987 and the Nevada-Florida Land Exchange Authorization Act of 1987. Hearing before the Subcommittee on Public Lands, National Parks and Forests of the Committee on Energy and Natural Resources, United States Senate, One Hundredth Congress, First Session on S. 59, S. 854, June 30, 1987

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    Each of these measures is cosponsored by the two Nevada Senators, Senators Hecht and Reid, and there were companion measures pending in the House. A version of S. 59 - the so-called Nevada Interchange bill - passed the House last year. Primarily because of a dispute over language regarding federal reserved water rights, that measure did not pass the Senate. The Aerojet land exchange embodied in S. 854 proved to be fairly controversial. While the exchange is supported by the entire Nevada congressional delegation as well as the Governor, a number of conservation groups presented testimony in opposition to this proposed exchange. Texts of both bills are first included, followed by 26 statements of various recreation and conservation officials as well as local, state, and federal government official.

  2. The Practice of Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald C.

    2006-01-01

    for churches and parking lots that replaced buildings onceThe full cost of the parking lot is incurred to serve a fewbuilt have supersize parking lots that are asphalt eyesores,

  3. SFpark: Pricing Parking by Demand

    E-Print Network [OSTI]

    Pierce, Gregory; Shoup, Donald

    2013-01-01

    to think about the price of parking just as they now thinkrepairs, and car purchases. Parking will become a part ofthe right occupancy for curb parking, almost everyone will

  4. The Price of Unwanted Parking

    E-Print Network [OSTI]

    Manville, Michael; Shoup, Donald

    2010-01-01

    02.pdf. The full report, “Parking requirements as a barrier02 The Price of Unwanted Parking Michael Manville and Donalda city requires on-site parking for all new housing, housing

  5. Parking Infrastructure and the Environment

    E-Print Network [OSTI]

    Chester, Mikhail; Horvath, Aprad; Madanat, Samer

    2011-01-01

    understand the full cost of parking. ? Nicholas Santero andLY L I T T L E A B O U T how parking infrastructure affectsBecause abundant free parking encourages solo driving and

  6. SUSTAINABLE PARKS, RECREATION and TOURISM

    E-Print Network [OSTI]

    SUSTAINABLE PARKS, RECREATION and TOURISM A bachelor's degree program in Sustainable Parks · Convention and visitors bureaus · Amusement parks · Cruise ships · Marina management Study Abroad in educational and social activities related to sustainability, food and environmental stewardship. Visit rise

  7. Kalaupapa National Historical Park National Park Service

    E-Print Network [OSTI]

    Boynton, Walter R.

    , and endangered Hawaiian monk seals. invasive plants Non-native plants like Christmas berry and lantana use water Park established (1980) limited hunting, food imported limited fishing, food imported Hawaiian monk 1794/1795 represent turning points in the rise and fall of the Hawaiian Kingdom. McCoy, Mark D. 2007

  8. UH Parking Access & Mid-Pacific Institute

    E-Print Network [OSTI]

    Hall Keller Hall Physical Science Building Pacific Ocean Science & Technology Kuykendall AnnexStairs Pond UH Parking Access & Mid-Pacific Institute Exit M¯anoa Innovation Center and Kau Auxiliary Services Pacific Biomedical Warehouse Agricultural Science Shops Campus Security n Landscaping

  9. UH Parking Access & Mid-Pacific Institute

    E-Print Network [OSTI]

    Hall Keller Hall Physical Science Building Pacific Ocean Science & Technology Kuykendall Annex44 44 Stairs Pond UH Parking Access & Mid-Pacific Institute Exit M¯anoa Innovation Center and Kau Auxiliary Services Pacific Biomedical Warehouse Agricultural Science Shops Campus Security n Landscaping

  10. Marine and coastal ecosystems include estuaries and coastal waters and lands. Within these systems are sensitive habitats, marine sanctuaries, national parks, aquaculture, fisheries, and tourism activities. Informed and responsible

    E-Print Network [OSTI]

    information on how weather and climate trends affect ecosystems, local communities, regulatory requirements of weather and climate on marine and coastal ecosystems. This type of information can help decision makersOverview Marine and coastal ecosystems include estuaries and coastal waters and lands. Within

  11. A study of historical vegetation in Lyndon B. Johnson National Historical Park 

    E-Print Network [OSTI]

    Gardner, Gwendolyn Ann

    1986-01-01

    of historic landscapes appears to have begun in the United States in 1872 when Yellowstone National Park, the world's first national park, was established to preserve a natural landscape. This was followed in 1890 by the addition of three more national... as national monuments areas of historic and scientific importance on land owned or controlled by the United States. Using this power, the president could protect historic areas until a national park could be established by an act of Congress. The first...

  12. (405) 325-3311 PARKING FACTSOU Parking Services

    E-Print Network [OSTI]

    Oklahoma, University of

    Facility. · If your class begins between 10 a.m. and noon, plan to park in one of the parking lots further out. With 847 spaces, the Duck Pond parking lot south of Brooks Street is always a good choice to familiarize yourself with available lots before arriving on campus. · OU Parking Services is a self

  13. 5. Wick, O. J. (ed.) Plutonium Handbook: a Guide to the Technology 3357 (American Nuclear Society, LaGrange Park, IL, 1980).

    E-Print Network [OSTI]

    5. Wick, O. J. (ed.) Plutonium Handbook: a Guide to the Technology 33­57 (American Nuclear Society superconductors. Phys. Rev. Lett. 8, 250­253 (1962). 11. Wolfer, W. G. Radiation effects in plutonium. Los Alamos

  14. 2009 Wind Technologies Market Report

    E-Print Network [OSTI]

    Wiser, Ryan

    2010-01-01

    land- based wind energy technology. 2009 Wind TechnologiesRenewable Energy 2009 WIND TECHNOLOGIES MARKET REPORT AUGUSTfor a variety of energy technologies, including wind energy.

  15. Hye-Sook Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    physicist Dr. Youichi Sakawa (left), Hye-Sook Park, and alignment operator Daren Hart prepare for an experiment in the NIF Control Room. The experiment was in support of an...

  16. Informal Parking: Turning Problems into Solutions

    E-Print Network [OSTI]

    Shoup, Donald

    2015-01-01

    Shoup. 2014. “Informal Parking Markets: Turning ProblemsShoup. 2014. “Informal Parking on Sidewalks: The BrokenYears’ War over free curb parking, and the revenue will

  17. The Access Almanac: Graduated Parking Fines

    E-Print Network [OSTI]

    Shoup, Donald

    2010-01-01

    THE ACCESS ALMANAC Graduated Parking Fines BY DONALD SHOUPC ITIES OFTEN INCREASE THEIR PARKING FINESWHEN overtime parking in a calendar year is $35, the second

  18. The Price of Parking on Great Streets

    E-Print Network [OSTI]

    Shoup, Donald

    2011-01-01

    UCTC-FR-20II-26 The Price of Parking on Great Streets Donaldare enacted. With performance-based parking prices, localrevenue return, and parking increment finance, everybody

  19. Seeking Urbane Parking Solutions [The Transect

    E-Print Network [OSTI]

    O'Looney, Brian; Payton, Neal

    2006-01-01

    town-center shared- parking solutions resulting from hardfamily residential setting, parking normally takes the formmultistory precast parking decks cost any- where from $10-$

  20. Oregon Trail Wind Park | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly Smart Grid DataInformation LandWind Park Jump to: navigation,

  1. Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

    SciTech Connect (OSTI)

    Kopotic, James D. [United States Department of Energy, Oak Ridge Office, P.O. Box 2001, Oak Ridge, TN 37831 (United States)] [United States Department of Energy, Oak Ridge Office, P.O. Box 2001, Oak Ridge, TN 37831 (United States); Ferri, Mark S.; Buttram, Claude [URS - CH2M Oak Ridge LLC, East Tennessee Technology Park, P. O. Box 4699, Oak Ridge, TN 37831 (United States)] [URS - CH2M Oak Ridge LLC, East Tennessee Technology Park, P. O. Box 4699, Oak Ridge, TN 37831 (United States)

    2013-07-01

    The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

  2. Parking Map 201415 Parking and ID Card Services

    E-Print Network [OSTI]

    Thornton, Mitchell

    lots may not be available for use on game days. Please see game day parking maps/notices. Airline Center (63) Level 1 F/S (H lot) Level 2 Visitor Level 3 AUP Level 4 AUP Level 5 AUP Daniel Parking Center (2) All Levels L Meadows Parking Center (70) Level 1 (P1) F/S (G lot) and Museum visitors (street

  3. Parking and Transport Policy Page 1 Parking and Transport Policy

    E-Print Network [OSTI]

    Mucina, Ladislav

    Parking and Transport Policy Page 1 Parking and Transport Policy Category: Facilities, Campus Life 1. PURPOSE To standardise and manage parking and transport on the Curtin Bentley campus including that support both State Government and University objectives in a manner that encourages public transport use

  4. July 12, 2008 Can't Find a Parking Spot? Check Smartphone

    E-Print Network [OSTI]

    Lu, Chenyang

    are in discussions with technology companies to deploy so-called smart parking systems, though San Francisco is ahead 47,000 gallons of gasoline and producing 730 tons of carbon dioxide. To install the market-priced parking system, San Francisco has used a system devised by Streetline, a small technology company that has

  5. UH Parking Access & Mid-Pacific Institute

    E-Print Network [OSTI]

    Art Building Kuykendall Hall Campus Center CORREA RO A D VISITO R PARKING Jakuan Tea House Sinclair Campus, please park in green Pay-to-Park stalls. Get ticket from automated Pay-to-Park machines. Maximum

  6. Carbon Park Environmental Impact Assessment

    E-Print Network [OSTI]

    of offsetting the University's carbon footprint, promoting biodiversity and establishing easily maintained Carbon Park Environmental Impact Assessment A B.E.S.T. Project By, Adam Bond 2011 #12; Bishop's University Carbon Park

  7. The Access Almanac: Solar Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald

    2012-01-01

    the city. In California, one solar-covered parking space canway. (Covering one parking space with solar panels will

  8. Toilet Theme Park

    E-Print Network [OSTI]

    Hacker, Randi

    2013-02-27

    of the world's first toilet culture park centered around a toilet-shaped building that was once the home of Sim Jae-duck, founder of the World Toilet Association, a group dedicated to bringing hygienic bathrooms to all world citizens. Famously born in his poor...

  9. KALELE ROAD Parking Office

    E-Print Network [OSTI]

    FREEWAY H1 KALELE ROAD Parking Office on ground floor Bike Rack Locations Bike Lockers BICYCLE RACK Hale Kahawai Environmental Protection Services Federal Credit Union Energy House & Safety Office Bus Shelter Bus Shelter Art Building Sustainability Courtyard Kuykendall Hall Campus Center Jakuan Tea

  10. Campus Parking Map University of California

    E-Print Network [OSTI]

    Alvarez-Cohen, Lisa

    Campus Parking Map University of California BERKELEY #12;Campus Building Locations Parking Lots Campus parking lots are located around and near campus and in the hill areas east of campus. Parking lot/Weekend parking permits are valid weekdays after 5pm and on weekends in , , and designated lots. Parking on campus

  11. PARKING COMMISSION MINUTES March 5, 2013

    E-Print Network [OSTI]

    . Anecdotally, we know that the primary purpose of the Park & Ride parking lots is no longer as a remote parking lot; many people are parking cheaply and walking to nearby research buildings. Hultine suggested considering several options, including rezoning the parking lots to yellow, increasing the cost of the Park

  12. UNIVERSITY OF FLORIDA MILTON CAMPUS PARKING REGULATIONS

    E-Print Network [OSTI]

    Ma, Lena

    of the vehicle must be visible from parking lot throughways at all times. 2. Student parking decals allow parkingUNIVERSITY OF FLORIDA MILTON CAMPUS PARKING REGULATIONS PARKING REGULATIONS 1. Backing into or pulling through a campus parking space is prohibited. The vehicle decal displayed on the rear

  13. TigerTransit Routes & Parking Map

    E-Print Network [OSTI]

    Singh, Jaswinder Pal

    PARKING ZONE & LOT ASSIGNMENTS Parking in Princeton University parking lots is by permit only. To obtain in the assigned lot and zone indicated on the vehicle hangtag. Parking in an unassigned lot within a designated2014­2015 TigerTransit Routes & Parking Map Contact Us Transportation & Parking Services New South

  14. Section 2: Landscapes of Capital - Landscapes of Knowledge and High Technology

    E-Print Network [OSTI]

    O'Mara, Margaret

    2007-01-01

    technology industries, the Stanford Research Park became thetechnology industry by building a research park adjacent toindustry, with drawing power greater than low taxes or cheap labor. ” 5 The Early Research Park

  15. 2011 Wind Technologies Market Report

    E-Print Network [OSTI]

    Bolinger, Mark

    2013-01-01

    land-based wind energy technology. 2011 Wind Technologiesfor a variety of energy technologies, including wind energy.Renewable Energy Laboratory’s National Wind Technology

  16. 2010 Wind Technologies Market Report

    E-Print Network [OSTI]

    Wiser, Ryan

    2012-01-01

    land-based wind energy technology. 2010 Wind Technologiesfor a variety of energy technologies, including wind energy.2010 Wind Technologies Market Report Federal Energy

  17. 2012 Wind Technologies Market Report

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01

    land-based wind energy technology. 2012 Wind Technologiesfor a variety of energy technologies, including wind energy.of Energy (DOE) Wind & Water Power Technology Office team

  18. Join The Conversation: Apps for Energy Twitter Q&A with U.S. CTO Todd Park

    Broader source: Energy.gov [DOE]

    Join us this Tuesday, April 17, at 2 PM EDT for an Apps for Energy Twitter Q&A with U.S. Chief Technology Officer Todd Park.

  19. Smart Parking Management Pilot Project: A Bay Area Rapid Transit (BART) District Parking Demonstration

    E-Print Network [OSTI]

    Shaheen, Susan; Rodier, Caroline; Eaken, Amanda M.

    2005-01-01

    201. Ferguson, E. (2000). Parking management and commuterand Okuda, T. (1996). Smart parking in Toyota’s Motown. ITS:development of an advanced parking information system plan.

  20. Employer-Paid parking: A Nationwide Survey of Employers' Parking Subsidy Policies

    E-Print Network [OSTI]

    Shoup, Donald C.; Breinholt, Mary Jane

    2001-01-01

    Cashing Out Employer-Pard Parking, Report No FTA- CA-11-Opportunity to Reduce Mlntmum Parking Requirements," JournalPickrell (1980) Free Parking as a Transportation Problem,

  1. INDEPENDENT VERIFICATION SURVEY REPORT FOR EXPOSURE UNITS Z2-24, Z2-31, Z2-32, AND Z2-36 IN ZONE 2 OF THE EAST TENNESSEE TECHNOLOGY PARK OAK RIDGE, TENNESSEE

    SciTech Connect (OSTI)

    none,

    2013-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management selected Oak Ridge Associated Universities (ORAU), through the Oak Ridge Institute for Science and Education (ORISE) contract, to perform independent verification (IV) at Zone 2 of the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. ORAU has concluded IV surveys, per the project-specific plan (PSP) (ORAU 2013a) covering exposure units (EUs) Z2-24, -31, -32, and -36. The objective of this effort was to verify the following. • Target EUs comply with requirements in the Zone 2 Record of Decision (ROD) (DOE 2005), as implemented by using the dynamic verification strategy presented in the dynamic work plan (DWP) (BJC 2007) • Commitments in the DWP were adequately implemented, as verified via IV surveys and soil sampling The Zone 2 ROD establishes maximum remediation level (RLmax) values and average RL (RLavg) values for the primary contaminants of concern (COCs) U-234, U-235, U-238, Cs-137, Np-237, Ra-226, Th-232, arsenic, mercury, and polychlorinated biphenyls (PCBs). Table 1.1 lists Zone 2 COCs with associated RLs. Additional radiological and chemical contaminants were also identified during past characterization and monitoring actions, though the ROD does not present RLs for these potential contaminants. IV activities focused on the identification and quantification of ROD-specific COCs in surface soils, but also generated data for other analytes to support future decisions. ORAU personnel also reviewed EU-specific phased construction completion reports (PCCRs) to focus IV activities and identify potential judgmental sample locations, if any.

  2. Smart Parking Management Pilot Project: A Bay Area Rapid Transit (BART) District Parking Demonstration

    E-Print Network [OSTI]

    Shaheen, Susan; Rodier, Caroline J.; Eaken, Amanda M.

    2005-01-01

    and Okuda, T. (1996). Smart parking in Toyota’s Motown. ITS:development of an advanced parking information system plan.Ideal Mates For University Parking Programs. The Parking

  3. EXTENDED PARKING REQUEST COLORADO SCHOOL OF MINES

    E-Print Network [OSTI]

    to Parking Services and vehicle must be parked in Lot A. T This option is not available for visitorsEXTENDED PARKING REQUEST COLORADO SCHOOL OF MINES FACILITIES MANAGEMENT DEPT PARKING SERVICES to Parking Services allows a CSM student or employee to leave his/her vehicle within the campus boundaries

  4. Terrein / car park: Inleveren bij / submit to

    E-Print Network [OSTI]

    Procedure: Terrein / car park: Inleveren bij / submit to: Info: Vul a.u.b. uw gegevens in / please terrein, voor de duur van: Requests access to the car park(s) mentioned above for the period of voorbehoud kan van toepassing zijn. You can request access rights for the local car park(s) on one campus

  5. Parking Cash Out: Chapters 1 and 22-28 from the manuscript of The High Cost of Free-Parking

    E-Print Network [OSTI]

    Shoup, Donald C.

    2001-01-01

    carriages nowcreate a parking problem, but newsolutions willone promising solution: parking cash out. After all, weFranceor Spain to put up a parking lot. FREE PARKING FIGURE

  6. A second row Parking Paradox

    E-Print Network [OSTI]

    S. R. Fleurke; C. Kuelske

    2008-11-28

    We consider two variations of the discrete car parking problem where at every vertex of the integers a car arrives with rate one, now allowing for parking in two lines. a) The car parks in the first line whenever the vertex and all of its nearest neighbors are not occupied yet. It can reach the first line if it is not obstructed by cars already parked in the second line (screening). b) The car parks according to the same rules, but parking in the first line can not be obstructed by parked cars in the second line (no screening). In both models, a car that can not park in the first line will attempt to park in the second line. If it is obstructed in the second line as well, the attempt is discarded. We show that both models are solvable in terms of finite-dimensional ODEs. We compare numerically the limits of first and second line densities, with time going to infinity. While it is not surprising that model a) exhibits an increase of the density in the second line from the first line, more remarkably this is also true for model b), albeit in a less pronounced way.

  7. Report: EM Energy Park Initiative

    Office of Environmental Management (EM)

    To further aid the Assistant Secretary in her efforts to implement the Energy Park Initiative, the EPI Subcommittee offers the following recommendations: Recommendation...

  8. Technology Development Park PADETEC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)ModelTalbottsInformation Research

  9. East Tennessee Technology Park | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n cEnergy (AZ, CA,EnergystudentThis theEVERETTA N ADepartmentEastEast|

  10. Notus Falmouth Technology Park | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII Jump to:Information 3rd|Northfork Electric Coop, IncUSA(TXR150000) |B

  11. East Tennessee Technology Park | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:IAboutReubenPress Releases EMMarket Applications forEast

  12. Princeton University Parking Rules & Regulations Transportation & Parking Services at Princeton University is committed to providing

    E-Print Network [OSTI]

    Torquato, Salvatore

    for a vehicle to be legally parked on campus. The hangtag indicates parking zone and lot assignments and must will be issued. II. Parking Zone and lot assignments FacUlty/StaFF PaRkIng Each UniversiPrinceton University Parking Rules & Regulations Transportation & Parking Services at Princeton

  13. The Access Almanac: Solar Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald

    2012-01-01

    getting solar power from our parking lots. ? A C C E S STHE ACCESS ALMANAC Solar Parking Requirements DONALD SHOUP SC E I N T H E S U N — on parking lots surrounding commercial

  14. THE ACCESS ALMANAC - Making Parking Meters Popular

    E-Print Network [OSTI]

    Shoup, Donald

    2014-01-01

    market prices for curb parking, spend the revenue to improvechanging the politics of parking, cities can meter more ofair, and a cooler planet. Parking meters can then do a world

  15. The trouble with minimum parking requirements

    E-Print Network [OSTI]

    Shoup, Donald C.

    2001-01-01

    1996 Local junsd~ctlon parking requirements" a survey ofG.E. , 1972 Zoning, Parking, and Traffic. EnoFoundationforAn Approach to Determining Parking Demand, Planmng Service

  16. The Access Almanac: The Parking of Nations

    E-Print Network [OSTI]

    Shoup, Donald; Stark, Seth

    2000-01-01

    THE ACCESS ALMANAC The Parking of Nations B Y D O N A L D Spaved paradise and put up a parking lot. — Joni Mitchell V E4.4 billion vehicles. Parking would be a global problem. How

  17. Designing for ecology : the ecological park

    E-Print Network [OSTI]

    Power, Andres M

    2006-01-01

    This thesis aims to define a) what an ecological park is, and b) whether it is a new model in park design. Reference to the literature on landscape ecology is used to analyze the natural ecological merit of these parks, ...

  18. Technolog

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    focuses on multi-scale, multiphysics approaches to understanding natural systems, "engineering the earth" with sensing and drilling technologies and characterizing geomaterials...

  19. University Park Data Dashboard | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    data dashboard for University Park, Maryland, a partner in the Better Buildings Neighborhood Program. University Park Data Dashboard More Documents & Publications Massachusetts --...

  20. SSL Demonstration: Parking Garage Lighting, Washington, DC

    SciTech Connect (OSTI)

    2013-06-01

    GATEWAY program report brief summarizing an SSL parking garage demonstration at the Dept. of Labor headquarters parking garage in Washington, DC.

  1. Valuing open space : land economics and neighborhood parks

    E-Print Network [OSTI]

    Miller, Andrew Ross, 1976-

    2001-01-01

    The thesis of the work is that statistical analysis can reliably measure individual preferences for different aspects of the built environment. These measurements can be used to understand and critique the effectiveness ...

  2. Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12

    SciTech Connect (OSTI)

    Davenport M.

    2009-04-15

    Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered vegetation but are generally open and accessible. With limited exception, all materials contained in the scrap yard have been removed and disposed at the EMWMF. Soils that underlay the original waste storage area in EUs 29 and 31 as well as soils that underlay the scrap piles in EUs 30 and 32 show substantially elevated radioactivity. In addition to soils present at the site, remaining portions of foundations/floor slabs for Bldgs. K-725, K-726, and K-736 as well as the unnamed pad at the northeast corner of the site constructed to support the sort and segregation operations at the K-770 Scrap Removal Project in 2006 and several other small, unnamed concrete pads are included in this waste lot. While many of these foundations/floor slabs will be removed because they are contaminated, some of the smaller unamed concrete pads will be removed in order to access contaminated soils that are around and under the pads and regrade the site. Appendix E contains a map showing the areas of soil and concrete pads that are expected to be excavated. Soils in the areas indicated on this map will be removed to approximately one foot below the surface. (This corresponds to the soil interval sampled and analyzed to characterize this waste lot.) Contaminants present in the soils are directly derived from metallic debris and rubbish handled by the waste storage operations, are concentrated in the top few inches, and include the predominant constituents of concern associated with the metallic waste already disposed at EMWMF. Additionally, some residual metallic debris remains embedded in the shallow soils that underlay the former debris piles. This residual metallic debris is eligible for disposal in the EMWMF WAC criteria as defined in Waste Profile for: Disposal of the Scrap Removal Project Waste Lot 65.1 East Tennessee Technology Park, Oak Ridge, Tennessee (BJC 2004a). This waste, however, has been included in Waste Lot 4.12 to conform to the more rigorous profiling requirements currently contained in Waste Acceptance Criteria Attainment Team Project Execution Plan Environmental Manag

  3. Address Lot Description 981 MADISON DR A PARKING LOT

    E-Print Network [OSTI]

    Arnold, Elizabeth A.

    Address Lot Description 981 MADISON DR A PARKING LOT 156 BLUESTONE DR A PARKING LOT EXTENDED 810 MADISON DR B PARKING LOT 897 UNIVERSITY BLVD C PARKING LOT 1170 HARRISON ST C1 PARKING LOT 1161 HARRISON ST C2 PARKING LOT 761 DUKE DRIVE C3 PARKING LOT 441 MARTIN LUTHER KING JR WAY C4 PARKING LOT 650 DUKE

  4. SC 229 Attachment 229-14 UAF Parking Advisory Committee

    E-Print Network [OSTI]

    Wagner, Diane

    estimates showed an energy consumption and cost reduction as high as 60% during the warmer winter months infraction appeals across campus. In December, Parking Services demonstrated new technology called IPC temperature and turn power off and on based on a programmed schedule with the intent to save money. Initial

  5. Energy Harvesting for Structural Health Monitoring Sensor Gyuhae Park1

    E-Print Network [OSTI]

    Simunic, Tajana

    for large-scale alternative energy generation using wind turbines and solar cells is mature technologyEnergy Harvesting for Structural Health Monitoring Sensor Networks Gyuhae Park1 , Tajana Rosing2 of California, San Diego La Jolla, CA 92093-0701 ABSTRACT This paper reviews the development of energy

  6. Ju Hun Yeon1 & Je-Kyun Park1

    E-Print Network [OSTI]

    Park, Je-Kyun

    Ju Hun Yeon1 & Je-Kyun Park1 1 Department of BioSystems, Korea Advanced Institute of Science and Technology (KAIST), 373-1 Guseong-dong, Yuseong-gu, Daejeon 305-701, Republic of Korea Correspondence culture environ- ment, there are no cellular structures or polymer scaffolds to be adhered

  7. Fuel Cell Hybrid Bus Lands at Hickam AFB: Hydrogen Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Bus Lands at Hickam AFB: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Project (Fact Sheet) Fuel Cell Hybrid Bus Lands at Hickam AFB:...

  8. Park and chill : redesign parking garage in Hong Kong

    E-Print Network [OSTI]

    Ting, Sze Ngai

    2011-01-01

    What are the aesthetics of urban infrastructure? Urban infrastructure has remained isolated to human activities. We all share memory and experience with urban infrastructure, e.g. we drive on the same roads and park our ...

  9. UC Berkeley 1 Bancroft Center Parking

    E-Print Network [OSTI]

    Silver, Whendee

    PP UC Berkeley 2 2 3 3 4 4 1 1 Bancroft Center Parking Inkstone Parking Garage Anna Head West Lot. Please prepay for parking at the vending machine located in the center of the lot. The west lot is for permit parking only. Located below Copy Central, this underground lot is the closest to the Visitor

  10. CAMP PARKING PERMIT VALID LOT G ONLY

    E-Print Network [OSTI]

    Burg, Theresa

    PERMIT No. SUMMER CAMP PARKING PERMIT VALID LOT G ONLY (REFER TO SIGNS IN PARKING LOT TO ENSURE RD. Aperture Lake LOT F LOT FS LOT J LOT N LOT C University Day Care The Quad Summer Camp Parking Lot PROPER USE) VALID FROM: JUNE 29, 2015 TO: AUG 28, 2015 VALID ONLY DURING TIMES BELOW PARKING ANYWHERE

  11. Where Innovation Is Tradition Parking & Transportation

    E-Print Network [OSTI]

    · Discounted daily passes/deck validations · Carpool Programs · Preferred Parking · Rebate Program for Reserved

  12. KALELE ROAD PARKING PERMIT ZONESPARKING PERMIT ZONES

    E-Print Network [OSTI]

    Greenhouses Institute for Astronomy University of Hawai`i Press Federal Credit Union Energy House & SafetyFREEWAY H1 KALELE ROAD PARKING PERMIT ZONESPARKING PERMIT ZONES 2010 - 20112010 - 2011 Parking Services Office · 2600 Campus Road, Room 014 · Honolulu, HI 96822 · www.hawaii.edu/parking · parking

  13. Accessibility Application Blue Badge Car Park UK

    E-Print Network [OSTI]

    Painter, Kevin

    i Accessibility Application Blue Badge Car Park UK Konstantinos Grassos H00113751 August 2012. In this project, Blue Badge Car Park (BBCP) is presented which is actually a mobile-based park finder application. It specifically focuses on finding parking spaces for wheelchair users, which are indicated by the blue badge

  14. Department of Energy - Oak Ridge Operations and URS - CH2M Oak Ridge LLC. Partnering Framework for the Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 12348

    SciTech Connect (OSTI)

    Schubert, Allen L. [URS - CH2M Oak Ridge LLC (UCOR), East Tennessee Technology Park D and D and Environmental Remediation Project, Oak Ridge, Tennessee 37830 (United States)

    2012-07-01

    The cleanup and re-industrialization of the East Tennessee Technology Park (ETTP) hinges on a collaborative working relationship between the cleanup contractor and the U.S. Department of Energy's (DOE)-Oak Ridge Office (ORO). A Partnering Framework document was signed on June 30, 2011, with an ultimate goal of completing the contract scope of work ahead of schedule and under budget. This partnering process was the first time that DOE and its contractor, jointly developed and signed such an agreement before the contractor assumed management responsibilities of the Site. A strong desire of both parties to utilize a partnering approach in the performance of their respective responsibilities is evident. The Partnering Framework was modeled after a partnering process employed by the California Department of Transportation, Division of Construction. This partnering process has been used successfully by the California Department of Transportation and its major contractors for many years with great success. The partnering process used at ETTP was a phased approach. First, a Partnering Framework document was developed and signed June 30, 2011, by the Partnering Sponsors, the two leaders of the ETTP cleanup and re-industrialization project, the DOE-ORO Assistant Manager for Environmental Management and the contractor's President and Program Manager. In this way the partnering process could begin when the contactor assumed ETTP Site management responsibilities on August 1, 2011. The Partnering Framework then set the stage for the second phase of the partnering process which would be development of the Partnering Agreement and the kick-off of the first of a number of facilitated Partnering Workshops. Key elements of the Partnering Framework document include: (1) a statement of commitment which affirms the desire of both parties to work collaboratively toward the cleanup and re-industrialization of the ETTP Site; (2) a vision which describes both parties ultimate goal of safe, efficient cleanup, and (3) an implementation section which describes how the partnering process will be conducted, as well as how disputes will be managed. The signed Partnering Framework and Partnering Agreement provide the needed foundation of the safe and cost-effective cleanup and re-industrialization of the ETTP Site. The benefits of partnering have already been observed as the Partnering Teams effectively addressed a number of early contract and project challenges such as funding reductions and progress in resolving Material Differences. Based, in part of the successes achieved as a result of the partnering between UCOR and DOE-ORO, UCOR and DOE-ORO are extending this partnering approach to a number of the ETTP Site stakeholders. For example, DOE-ORO, UCOR and CROET signed a Partnering Agreement on November 3, 2011. This Partnering Agreement affirms the parties' commitment to work collaboratively to re-industrialize the ETTP Site. Both DOE-ORO and UCOR are looking to extend this partnering approach with other Site stakeholders such as its employees, its subcontractors, the Oak Ridge National Laboratory and the Y-12 Security Complex in the future. (authors)

  15. Transportation & Parking Services Projected Long Range Operating Plan/Budget Parking Operations

    E-Print Network [OSTI]

    ,580) $588 $2,016 $3,284 $4,825 $4,019 Parking Lot Maint/Construction ($423,051) ($442,481) ($864,785) ($224Transportation & Parking Services Projected Long Range Operating Plan/Budget Parking Operations/UCOP Assessment ($256) ($128) ($80) ($80) Parking Structure Feasibility Study Debt Service - Parking Structures $0

  16. Parking Citation Appeal UVA Parking and Transportation, P.O. Box 400000, Charlottesville, Va. 229044000

    E-Print Network [OSTI]

    Acton, Scott

    UNACCEPTABLE GROUNDS FOR APPEAL ARE: Parking for SHORT periods, parking in a nearly empty lot, not knowing Parking Citation Appeal UVA Parking and Transportation, P.O. Box 400000, Charlottesville, Va. 229044000 (434)9247231 Office: 1101 Millmont Street, Charlottesville, Va. 22904 www.virginia.edu/parking

  17. Park Profiler/Jump Analyzer Practical method for determining terrain park jump performance

    E-Print Network [OSTI]

    . Terrain Park jump safety as a rider/resort partnership II. USTPC criteria: Quantifying best practices in terrain park jump design III. "Park Profiler" - practical tool to measure TP jump IV. "Jump Analyzer of flying ... but, as Icarus leaned the hard way, there are risks. #12;Terrain Park Jump Safety Terrain park

  18. An analysis of Utah State Park visitors 

    E-Print Network [OSTI]

    Burns, Dennis C.

    1988-01-01

    the summer of 1987 (June 13 through September 11) . The questions were asked concurrent with a visitation study being conducted in the parks. Statewide, occupants of 1589 vehicles were surveyed from 12 representative parks, which represents 7, 649 park... phases of the survey. A series of questions were asked in order to profile the visitor to Utah State Parks. Information was compiled on type of use, activities in the parks, and state or country of residence. Further questions dealt with how often...

  19. Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar Fuel ProductionRecoverable15/2008Technologies Technologies

  20. Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar FuelTechnology /newsroom/_assets/images/s-icon.png Technology

  1. Smart Parking Management Field Test: A Bay Area Rapid Transit (BART) District Parking Demonstration

    E-Print Network [OSTI]

    Shaheen, Susan

    2005-01-01

    Suzuki, T. and Yamomoto, S. Parking system for highways inA feasibility study of a parking information system in NYC.1997). Drivers’ response to parking guidance and information

  2. Urban Parks: The Value of Small Urban Parks, Plazas and Other Outdoor Spaces 

    E-Print Network [OSTI]

    Shafer, Carl Scott; Jacob, John

    2006-11-27

    People need parks. Great urban parks are places where communities come together, people interact, and social capital develops. Learn the characteristics of great urban parks and how they are created....

  3. Boundary Creek Thermal areas of Yellowstone National Park I: thermal activity and geologic setting

    SciTech Connect (OSTI)

    Hutchinson, R.A.

    1980-09-01

    Proposed geothermal leasing in the Island Park Geothermal Area (IPGA) in national forest and public lands adjacent to Yellowstone National Park has called attention to the moderate to high temperature springs of the Boundary Creek Thermal Areas. Up until late 1977 no description or geochemical inventory studies had been conducted in these areas. The thermal springs are scattered in four major groups along the Boundary Creek drainage with three to six km. of the IPGA - park border. Observations and analyses of physical and chemical indicators suggest that the source is under the Madison Plateau and that the waters are generally similar in the lower three thermal units. These hot springs should be monitored so as to provide early warning of change in the event that geothermal development in the IPGA causes withdrawal of groundwater from Yellow Stone National Park.

  4. Smart Parking Mangement Field Test: A Bay Area Rapid Transit (BART) District Parking Demonstration Final Report

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan; Kemmerer, Charlene

    2008-01-01

    infrastructure (e.g. , lanes, parking). On the basis of aat bicycle and e-bike parking lots along the main travel

  5. Envisioning Parking Strategies for the Post-Automobile City

    E-Print Network [OSTI]

    Circella, Giovanni

    2010-01-01

    dictionary definition, a parking lot is simply “an area usedright location and design of parking lots allows the properallows creating surface parking lots close to the locations

  6. Forrestal Garage Parking Procedures, Revised February 1, 2015...

    Office of Environmental Management (EM)

    Forrestal Garage Parking Procedures, Revised February 1, 2015 Forrestal Garage Parking Procedures, Revised February 1, 2015 Forrestal Garage Parking Procedures - The Forrestal...

  7. Quantity versus Quality in Off-Street Parking Requirements

    E-Print Network [OSTI]

    Mukhija, Vinit; Shoup, Donald

    2006-01-01

    Circle Centre: How parking helped make urban retail/entertainment development work. Parking, 25–33. State of NewInstitute. (1983). Shared parking. Washington, DC: Author.

  8. The Politics and Economics of Parking on Campus

    E-Print Network [OSTI]

    Shoup, Donald

    2011-01-01

    W. (1956). 'University Campus Parking." Traffic Quarterlyincome tax return. Campus parking scandals even break intoCoppi died at age 40. 31 'Parking Nightmares and other

  9. Parking on a Smart Campus: Lessons for Universities and Cities

    E-Print Network [OSTI]

    Shoup, Donald C.

    2005-01-01

    1997. “The High Cost of Free Parking,” Journal of PlanningTrouble with Minimum Parking Requirements,” TransportationThe High Cost of Free Parking, Chicago: Planners Press.

  10. On-Street Parking Spaces for Shared Cars

    E-Print Network [OSTI]

    Osgood, Andrea

    2010-01-01

    Reducing the on-street parking available to privately ownedof carsharing. Each on- street parking space dedicated to a2010. “Carsharing and Parking Policy: A Review of North

  11. Parking on a Smart Campus: Lessons For Universities and Cities

    E-Print Network [OSTI]

    Shoup, Donald

    2005-01-01

    1997. “The High Cost of Free Parking,” Journal of PlanningTrouble with Minimum Parking Requirements,” TransportationThe High Cost of Free Parking, Chicago: Planners Press.

  12. The Access Almanac: Ending the Abuse of Disabled Parking Placards

    E-Print Network [OSTI]

    Shoup, Donald

    2011-01-01

    Ending the Abuse of Disabled Parking Placards DONALD SHOUP Aattention for repeatedly parking illegally in spaceshandicappedfraud.org. Making curb parking accessible to

  13. Driving the National Parks Forward | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Parks Forward Driving the National Parks Forward June 19, 2012 - 4:02pm Addthis Propane shuttle buses used to transport visitors at Mammoth Cave National Park. | Photo...

  14. Technology Available for Licensing Office of Technology Management

    E-Print Network [OSTI]

    Maroncelli, Mark

    Technology Available for Licensing Office of Technology Management The Pennsylvania State University 113 Technology Center, University Park, PA 16802 814.865.6277 phone; 814.865.3591 fax Contact: Matthew D. Smith Sr. Technology Licensing Officer The Pennsylvania State University Phone: (814) 863

  15. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    and testing the gas centrifuge method of uranium enrichment and laser isotope separation R&D. By 1985 was to enrich uranium for use in atomic weapons. After the war, the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and recycling of uranium recovered from spent fuel

  16. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    centrifuge method of uranium enrichment and laser isotope separation research and development (R&D). By 1985 was to enrich uranium for use in atomic weapons. After the war, the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and recycling of uranium recovered from spent fuel

  17. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    and testing of the gas centrifuge method of uranium enrichment and the laser isotope separation research was to enrich uranium for use in atomic weapons. After the war, the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and recycling of uranium recovered from spent fuel

  18. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    of this 20-year period included development and testing of the gas centrifuge method of uranium enrichment-25 Site, its primary mission was to enrich uranium for use in atomic weapons. After the war the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and to recycle

  19. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    included development and testing of the gas centrifuge method of uranium enrichment and the laser isotope was to enrich uranium for use in atomic weapons. After the war, the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and recycling of uranium recovered from spent fuel

  20. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    the gas centrifuge method of uranium enrichment and laser isotope separation R&D. By 1985, the demand was to enrich uranium for use in atomic weapons. After the war, the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and recycling of uranium recovered from spent fuel

  1. East Tennessee Technology Park 3-1 3. East Tennessee Technology Park

    E-Print Network [OSTI]

    Pennycook, Steve

    of this 20-year period included development and testing of the gas centrifuge method of uranium enrichment was to enrich uranium for use in atomic weapons. After the war the mission was changed to include the enrichment of uranium for nuclear reactor fuel elements and recycling of spent fuel. The name was changed to the Oak

  2. Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With U.S. CoalMexico IndependentMatter and Technologies R&D

  3. Land Use and Land Cover Change

    SciTech Connect (OSTI)

    Brown, Daniel; Polsky, Colin; Bolstad, Paul V.; Brody, Samuel D.; Hulse, David; Kroh, Roger; Loveland, Thomas; Thomson, Allison M.

    2014-05-01

    A contribution to the 3rd National Climate Assessment report, discussing the following key messages: 1. Choices about land-use and land-cover patterns have affected and will continue to affect how vulnerable or resilient human communities and ecosystems are to the effects of climate change. 2. Land-use and land-cover changes affect local, regional, and global climate processes. 3. Individuals, organizations, and governments have the capacity to make land-use decisions to adapt to the effects of climate change. 4. Choices about land use and land management provide a means of reducing atmospheric greenhouse gas levels.

  4. Parking on a Random Tree

    E-Print Network [OSTI]

    H. Dehling; S. R. Fleurke; C. Kuelske

    2007-11-26

    Consider an infinite tree with random degrees, i.i.d. over the sites, with a prescribed probability distribution with generating function G(s). We consider the following variation of Renyi's parking problem, alternatively called blocking RSA: at every vertex of the tree a particle (or car) arrives with rate one. The particle sticks to the vertex whenever the vertex and all of its nearest neighbors are not occupied yet. We provide an explicit expression for the so-called parking constant in terms of the generating function.

  5. Solar Parking Structure in California

    Broader source: Energy.gov [DOE]

    This photograph features the photovoltaic (PV) system at the Cal Expo in Sacramento, California, that was "made for the shade," but it does much more. Installed in September 2000, the 540-kilowatt PV system produces enough energy to power about 180 homes. In addition, the solar arrays serve as an oasis of shaded parking for 1,000 cars in a desert of scorching blacktop. The project was designed and built by Kyocera Solar/Utility Power Group for the Sacramento Municipal Utility District (SMUD). At the time, this was the largest parking lot solar system in the world today. Cal Expo is the site of many events, including the California State Fair.

  6. NorthParkLoop Park AvenueGetwellRoad

    E-Print Network [OSTI]

    Memphis, University of

    Field Football Practice Fields Track and Field Golf Driving Golf Green FedEx Park A B C D E F G H I J K Building 53 - Gas Pump I-4 126 4162-4168 Buford Ellington Dr South L-9 532 Building 104 - Maintenance 134 Student Family Housing - Community L-7 543 Building 23 - Catfish Research Center F-2 135 4211

  7. Pedestrian Only Area University visitors' car parks (limited access)

    E-Print Network [OSTI]

    Wirosoetisno, Djoko

    Campus Map Pedestrian Only Area Car Parks University visitors' car parks (limited access) Other university car parks Public multi-storey car park Lawns Free City Bus Stop ST. GEORGE'S FIELD WOODHOUSE LAN E

  8. Table of Contents Free Patient Parking 1

    E-Print Network [OSTI]

    Chapman, Michael S.

    southeast of the first floor entrance. "The Smart Park meters will be covered in our patient parking area has been a series of "best days ever!" Whether the upbeat, energetic Fremont bridge group leader

  9. The Access Almanac: Solar Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald

    2012-01-01

    spaces be covered with solar panels to meet the increasedone parking space with solar panels will produce about 2who prefer not to install solar panels on their parking lots

  10. SSL Demonstration: Central Park, New York City

    SciTech Connect (OSTI)

    2012-11-01

    GATEWAY program report brief summarizing an SSL pathway lighting demonstration in Central Park in New York City.

  11. The Access Almanac: Solar Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald

    2012-01-01

    rich cities have great solar potential because the panelsper space. ) Because the solar potential of a parking lot

  12. For 24 hour parking information call 1-855-535-1100 Public Parking Information

    E-Print Network [OSTI]

    MacMillan, Andrew

    .) Emergency Lot: (entrance off 112 Street) Pay for parking upon arrival (Pay & Display machines) · Rates: $2For 24 hour parking information call 1-855-535-1100 Public Parking Information University of Alberta Hospital, Stollery Children's Hospital and Mazankowski Alberta Heart Institute Parking Office Room

  13. University of Aberdeen Car Parking Policy -v2 0.docx University of Aberdeen Car Parking Policy

    E-Print Network [OSTI]

    Neri, Peter

    University of Aberdeen Car Parking Policy - v2 0.docx University of Aberdeen Car Parking Policy 1.0 Why have a car parking policy? The University of Aberdeen is aware of the importance of corporate. The University has developed to such an extent that its current car park capacity is not sufficient to provide

  14. Quantity versus Quality in Off-Street Parking Requirements

    E-Print Network [OSTI]

    Mukhija, Vinit; Shoup, Donald

    2006-01-01

    In Southern California, solar collectors cover some parking72, No. 3 Figure 6. Solar collectors over a parking lot, Los

  15. PARKING COMMISSION MINUTES April 2, 2013

    E-Print Network [OSTI]

    from the parking lot, and clarified that 90-120 cars were in the lot every day. She added projects, but to balance urgent needs in parking lot repairs, and other commitments, 2% is what we need about the high number of reserved parking spaces in lot 3. Munoz made a motion to change westernmost

  16. PARKING COMMISSION MINUTES March 3, 2014

    E-Print Network [OSTI]

    the impact of 400 new students parking in this area for the School of Pharmacy, with lot 211 being the next closest parking lot where yellow spaces are available. There are enough staff at KGS that would change in the parking lot. There was discussion about signage, and that color zone rules would go into effect in August

  17. GATOR GROWL PARKING IMPACTS AND LOT CLOSURES

    E-Print Network [OSTI]

    Sin, Peter

    GATOR GROWL PARKING IMPACTS AND LOT CLOSURES In support of staging and celebrating Gator Growl, the following parking lots adjacent to Flavet Field will be closed. These lots will re-open on Saturday October parkers. * A vehicle parked in a Red 1 space in this lot will not be relocated; however, the vehicle

  18. Introduction The Bohemian Switzerland National Park and

    E-Print Network [OSTI]

    P r o o f s Fottea Introduction The Bohemian Switzerland National Park and the Elbe Sandstone with the Saxon Switzerland National Park and the Saxon SwitzerlandProtectedLandscapeAreainGermany they comprise of the Bohemian Switzerland National park is poor in water bodies because of high water permeability

  19. SWOPE PARK INDUSTRIAL AREA Kansas City, Missouri

    E-Print Network [OSTI]

    US Army Corps of Engineers

    SWOPE PARK INDUSTRIAL AREA Kansas City, Missouri MODIFICATION REQUEST Modification to support this request. PROJECT PURPOSE Swope Park Industrial Area is located in the south-central portion safe ingress/egress during flooding. The Swope Park Industrial Area has limited access, one

  20. Searching for a parking space 

    E-Print Network [OSTI]

    Laurier, Eric

    2005-01-01

    If you drive a car, it’s a classic problem on the busy city streets, the search for a parking space. Merely driving in the inner city is a challenging and frustrating affair because it is full of one way streets, dead ...

  1. Takoma Park, Maryland: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model forTechnologies95Symerton,EEconomiesTakoma Park,

  2. VISITOR PARKING Visitors to the UCF campus must purchase a

    E-Print Network [OSTI]

    Wu, Shin-Tson

    and Parking Information Center. Daily permits are valid in all of the "D" parking lots and unreserved garages are located at the Visitor and Parking Information Center in parking lot B-6. Coin Meter Parking: Coin metersP P PERSEUS LO O P VISITOR PARKING Visitors to the UCF campus must purchase a daily or hourly

  3. Title: Feasibility Study for 20 MW Hybrid Solar and Wind Park in Colombia

    E-Print Network [OSTI]

    Johnson, Eric E.

    1 of 2 Title: Feasibility Study for 20 MW Hybrid Solar and Wind Park in Colombia Principal to assess the Colombian solar and wind resources, looking at different technology options, anticipated performance, and evaluating the economics of solar and wind power technologies. The NMSU team also evaluates

  4. L. M. Darling, editor. 2000. Proceedings of a Conference on the Biology and Management of Species and Habitats at Risk, Kamloops, B.C., 15 -19 Feb.,1999. Volume Two. B.C. Ministry of Environment, Lands and Parks, Victoria, B.C. and University College of t

    E-Print Network [OSTI]

    Smith, Dan

    rates is fundamental to the evaluation of conservation options. In southeastern British Columbia and unprotected landscapes are important carni- vore conservation issues, since potential mortality, hydroelectric gen- eration, mining) and commercial (trapping, helicopter ski- ing) land uses occur

  5. The Heritage of the Future: Historical Keyboards, Technology, and Modernism

    E-Print Network [OSTI]

    Ng, Tiffany Kwan

    2015-01-01

    park on a new carillon and UFO-shaped technology museum inleveraged the museum’s UFO likeness in a television

  6. Way to recycle, BES Technologies | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    has reached a major milestone by recycling 1 million gallons of radiological waste water through its laundry operations located at the East Tennessee Technology Park. This...

  7. Using Waste Heat for External Processes; Industrial Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    necessary? Resources See also the ASM Handbook, Volumes 1 (1990) and 2 (1991), Materials Park, OH: ASM International; Combustion Technology Manual, Fifth Edition, Cincinnati, OH:...

  8. The Parkes Pulsar Timing Array

    E-Print Network [OSTI]

    R N Manchester

    2006-04-13

    Given sufficient sensitivity, pulsar timing observations can make a direct detection of gravitational waves passing over the Earth. Pulsar timing is most sensitive to gravitational waves with frequencies in the nanoHertz region, with the most likely astronomical sources being binary super-massive black holes in galaxy cores. The Parkes Pulsar Timing Array project uses the Parkes 64-m radio telescope to make precision timing observations of a sample of about 20 millisecond pulsars with a principal goal of making a direct detection of gravitational waves. Observations commenced about one year ago and so far sub-microsecond timing residuals have been achieved for more than half of these pulsars. New receiver and software systems are being developed with the aim of reducing these residuals to the level believed necessary for a positive detection of gravitational waves.

  9. The Parkes Multibeam Pulsar Survey

    E-Print Network [OSTI]

    I. H. Stairs; A. G. Lyne; F. Camilo; N. P. F. McKay; D. C. Sheppard; D. J. Morris; R. N. Manchester; J. F. Bell; V. M. Kaspi; F. Crawford; N. D'Amico

    1999-03-18

    The Parkes multibeam pulsar survey is a high-frequency, fast-sampled survey of the Galactic Plane, expected to discover at least 500 new pulsars. To date, over 200 pulsars have been found, including several young pulsars and at least one with a very high magnetic field. Seven of the new stars are in binary systems; this number includes one probable double-neutron-star system, and one pulsar with an extremely massive companion.

  10. The Impact of Biofuel Mandates on Land Use Suhail Ahmad

    E-Print Network [OSTI]

    The Impact of Biofuel Mandates on Land Use by Suhail Ahmad B.E., Avionics Engineering National, Technology and Policy Program #12;#12;3 The Impact of Biofuel Mandates on Land Use by Suhail Ahmad Submitted of Master of Science in Technology and Policy ABSTRACT The use of biofuels in domestic transportation sector

  11. Oak Ridge reservation land-use plan

    SciTech Connect (OSTI)

    Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.; Johnson, W. A.; Peitzsch, F. C.; Scott, T. H.; Theisen, M. R.; Tuck, S. C.

    1980-03-01

    This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implement the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.

  12. Parke Panda Corporation aka Parke Industries | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio Program |View NewParatek Microwave IncParke County, Indiana:

  13. Appendix `A' to Traffic Management and Parking

    E-Print Network [OSTI]

    Painter, Kevin

    . Introduction 3 2. Procedures: 3 - 6 2.1 Vehicle Insurance 3 2.2 Road Tax 3 2.3 Edinburgh Campus ­ Car Parks on campus must be insured for at least third party fire and theft. 2.2 Road Tax All private vehicles parked.8 Mobility Parking 4 2.9 Liability 4 2.10 Compliance 4 2.11 Statutory Off Road Notification (SORN) 4 2

  14. Technology Available for Licensing Office of Technology Management-The Pennsylvania State Univ.

    E-Print Network [OSTI]

    Maroncelli, Mark

    Technology Available for Licensing Office of Technology Management-The Pennsylvania State Univ. 113 Technology Center, University Park, PA 16802 814.865.6277 phone; 814.865.3591 fax Contact: WilliamHGowen Sr.Technology-desulfurization technology is complicated and expensive to use and a variety of other desulfurization processes have been

  15. Galvez Lot Event Parking Guidelines Effective: December 1, 2012

    E-Print Network [OSTI]

    Jurafsky, Daniel

    Galvez Lot Event Parking Guidelines Effective: December 1, 2012 Event parking at the improved Galvez Lot The Galvez Lot (L-96) will remain an "event" parking lot, with a maximum parking capacity to be free of charge. Event sponsors arrange for use of the Galvez Lot through Parking & Transportation

  16. Jackson Park Hospital Green Building Medical Center

    SciTech Connect (OSTI)

    William Dorsey; Nelson Vasquez

    2010-03-31

    Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago's recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work. The new green building houses the hospital's Family Medicine Residency Program and Specialty Medical Offices. The residency program has been vital in attracting new, young physicians to this medically underserved area. The new outpatient center will also help to allure needed medical providers to the community. The facility also has areas designated to women's health and community education. The Community Education Conference Room will provide learning opportunities to area residents. Emphasis will be placed on conserving resources and protecting our environment, as well as providing information on healthcare access and preventive medicine. The new Medical Office Building was constructed with numerous energy saving features. The exterior cladding of the building is an innovative, locally-manufactured precast concrete panel system with integral insulation that achieves an R-value in excess of building code requirements. The roof is a 'green roof' covered by native plantings, lessening the impact solar heat gain on the building, and reducing air conditioning requirements. The windows are low-E, tinted, and insulated to reduce cooling requirements in summer and heating requirements in winter. The main entrance has an air lock to prevent unconditioned air from entering the building and impacting interior air temperatures. Since much of the traffic in and out of the office building comes from the adjacent Jackson Park Hospital, a pedestrian bridge connects the two buildings, further decreasing the amount of unconditioned air that enters the office building. The HVAC system has an Energy Efficiency Rating 29% greater than required. No CFC based refrigerants were used in the HVAC system, thus reducing the emission of compounds that contribute to ozone depletion and global warming. In addition, interior light fixtures employ the latest energy-efficient lamp and ballast technology. Interior lighting throughout the building is operated by sensors that will automatically turn off lights inside a room when the room is unoccupied. The electrical traction elevators use less energy than typical elevators, and they are made of 95% recycled material. Further, locally manufactured products were used throughout, minimizing the amount of energy required to construct this building. The primary objective was to construct a 30,000 square foot medical office building on the Jackson Park Hospital campus that would comply with newly adopted City of Chicago green building codes focusing on protecting the environment and conserving energy and resources. The energy saving systems demonstrate a state of the-art whole-building approach to energy efficient design and construction. The energy efficiency and green aspects of the building contribute to the community by emphasizing the environmental and economic benefits of conserving resources. The building highlights the integration of Chicago's new green building codes into a poor, inner city neighborhood project and it is designed to attract medical providers and physicians to a medically underserved area.

  17. City of Ellensburg Renewable Energy Park

    Office of Energy Efficiency and Renewable Energy (EERE)

    This presentation was given at the March 19, 2013, CommRE webinar on Renewable Energy Parks by Robert Titus, City of Ellensburg, Washington special projects manager.

  18. WIND DATA REPORT Deer Island Parking Lot

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    WIND DATA REPORT Deer Island Parking Lot May 1, 2003 ­ July 15, 2003 Prepared for Massachusetts...................................................................................................................... 7 Wind Speed Time Series............................................................................................................. 7 Wind Speed Distributions

  19. Forrestal Garage Parking Guidelines February 2015.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to DOE Federal employees, including National Nuclear Security Administration (NNSA) Federal employees, parking at DOE Headquarters in the Forrestal Building. Requirements...

  20. University Park “STEP-UP” Proposal

    Broader source: Energy.gov [DOE]

    University Park “STEP-UP” Proposal: DE-FOA-0000148, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  1. Microsoft Word - Renew the Parks.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cost of PV systems was the biggest concern. To overcome this barrier, the National Park Service will have to form partnerships with other agencies and groups. Potential...

  2. Office for UMore Park Academic Initiatives-Summer Research 2010 UMore Park and Energy

    E-Print Network [OSTI]

    Netoff, Theoden

    .4% The University of Minnesota's vision for UMore Park consists of education, health and energy efficien- cies

  3. The Parkes Multibeam Pulsar Survey

    E-Print Network [OSTI]

    F. Camilo; A. G. Lyne; R. N. Manchester; J. F. Bell; V. M. Kaspi; N. D'Amico; N. P. F. McKay; F. Crawford; I. H. Stairs; D. J. Morris; D. C. Sheppard; A. Possenti

    1999-11-10

    The Parkes multibeam pulsar survey uses a 13-element receiver operating at a wavelength of 20 cm to survey the inner Galactic plane with remarkable sensitivity. To date we have collected and analyzed data from 45% of the survey region (|b| < 5 deg.; 260 deg. < l < 50 deg.), and have discovered 440 pulsars, in addition to re-detecting 190 previously known ones. Most of the newly discovered pulsars are at great distances, as inferred from a median dispersion measure (DM) of 400 pc/cm^3.

  4. Timing the Parkes Multibeam Pulsars

    E-Print Network [OSTI]

    R. N. Manchester; A. G. Lyne; F. Camilo; V. M. Kaspi; I. H. Stairs; F. Crawford; D. J. Morris; J. F. Bell; N. D'Amico

    1999-11-17

    Measurement of accurate positions, pulse periods and period derivatives is an essential follow-up to any pulsar survey. The procedures being used to obtain timing parameters for the pulsars discovered in the Parkes multibeam pulsar survey are described. Completed solutions have been obtained so far for about 80 pulsars. They show that the survey is preferentially finding pulsars with higher than average surface dipole magnetic fields. Eight pulsars have been shown to be members of binary systems and some of the more interesting results relating to these are presented.

  5. Effective 8/1/14 Page 1 Transportation Services Parking Administrator Guide to South Campus Parking Points

    E-Print Network [OSTI]

    Matrajt, Graciela

    License For: Name: Hank Scorpio * EID: 812990234 License: Parking Card Lot: S01 -[Business Unit ParkingEffective 8/1/14 Page 1 Transportation Services Parking Administrator Guide to South Campus Parking have evolved over time, so have the parking needs for employees, patients, and visitors in the area

  6. TIPS FOR THE PARKING LOT When you approach your parked vehicle, visually check the area around the

    E-Print Network [OSTI]

    Shoubridge, Eric

    TIPS FOR THE PARKING LOT When you approach your parked vehicle, visually check the area around Always try to park in visible, well lit areas Try to avoid parking next to a larger pickup truck or van." Exercise extra caution when using underground and enclosed parking garages. Try not to go alone. Use

  7. Parking Information Sheet 1. Salary sacrificing for on-campus parking permits is available to all full-time continuing

    E-Print Network [OSTI]

    Parking Information Sheet 1. Salary sacrificing for on-campus parking permits is available to all. 4. The application for salary sacrificing does not include an application for a parking permit. Staff members who wish to salary sacrifice their parking permit fee must first apply to Parking

  8. Parking

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/O Streams forOrhanTheoreticalSecurityParallel I/OAParking Print

  9. Transit-Based Smart Parking: Early Field Test Results

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan

    2005-01-01

    and J.C. Kopp. Real-time parking management systems forA. and J. Polak. Effect of parking information on travelers’T. and Okuda, T. Smart parking in Toyota’s Motown. ITS:

  10. Downtown Parking and Traffic Congestion: A Diagrammatic Exposition

    E-Print Network [OSTI]

    Arnott, Richard; Inci, Eren; Rowse, John

    2011-01-01

    An integrated model of downtown parking and tra¢ c conges-The stability of downtown parking and tra¢ c congestion.Rowse, J. 1999. Modeling parking. Journal of Urban Economics

  11. Envisioning Parking Strategies for the Post-Automobile City

    E-Print Network [OSTI]

    Circella, Giovanni

    2010-01-01

    Press. potential integration of parking policies into moreTeMA SP.09 Researches The Role of Parking in a Framework forrights reserved Envisioning Parking Strategies for the Post-

  12. The Parkes Pulsar Timing Array

    E-Print Network [OSTI]

    R. N. Manchester

    2007-11-12

    Detection and study of gravitational waves from astrophysical sources is a major goal of current astrophysics. Ground-based laser-interferometer systems such as LIGO and VIRGO are sensitive to gravitational waves with frequencies of order 100 Hz, whereas space-based systems such as LISA are sensitive in the millihertz regime. Precise timing observations of a sample of millisecond pulsars widely distributed on the sky have the potential to detect gravitational waves at nanohertz frequencies. Potential sources of such waves include binary super-massive black holes in the cores of galaxies, relic radiation from the inflationary era and oscillations of cosmic strings. The Parkes Pulsar Timing Array (PPTA) is an implementation of such a system in which 20 millisecond pulsars have been observed using the Parkes radio telescope at three frequencies at intervals of two -- three weeks for more than two years. Analysis of these data has been used to limit the gravitational wave background in our Galaxy and to constrain some models for its generation. The data have also been used to investigate fluctuations in the interstellar and Solar-wind electron density and have the potential to investigate the stability of terrestrial time standards and the accuracy of solar-system ephemerides.

  13. Primitive Land Plants 37 PRIMITIVE LAND PLANTS

    E-Print Network [OSTI]

    Koptur, Suzanne

    appeared at this time. Both of these groups of plants had life cycles, involving two generations. One of the year these mosses will produce tiny sporophytes. Prior to this generation, the tiny plants producedPrimitive Land Plants 37 PRIMITIVE LAND PLANTS These are the plants that were present soon after

  14. Arid Lands Ecology Facility management plan

    SciTech Connect (OSTI)

    None

    1993-02-01

    The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

  15. Planning to park on campus? Please remember that a parking permit is required and all UNT parking lots are enforced for

    E-Print Network [OSTI]

    Lots are located near your residence hall. Buy a permit online at www.unt.edu/transit P Pay and Park permit in the mail. + Look for the parking signs and be sure you are in the correct lot + Contact the Parking & Transportation office if you have any questions + All visitor parking is in Lot 20 (Fouts

  16. Mission Center Building 1855 Folsom parking lot

    E-Print Network [OSTI]

    Soloveichik, David

    LIME MCB Mission Center Building 1855 Folsom parking lot 100 BUCHANAN (NW Corner of Hermann 1855 Folsom parking lot 6:05 AM 6:11 AM 6:28 AM 6:41 AM 6:50 AM 6:20 AM 6:26 AM 6:43 AM 6:56 AM 7:05 AM

  17. Handicap Parking Tulsa Transit Bus Stop

    E-Print Network [OSTI]

    Oklahoma, University of

    Handicap Parking N S W E Bike Rack Tulsa Transit Bus Stop Building Entrance Parking Founders Hall..........Tulsa Graduate College C Wing Floor 1..........Security Office/Police Dispatch Floor 1..........Center of Applied Research for Non-Profit Organizations Floor 1..........OU-Tulsa Enrollment & Student Financial

  18. Burning cars in a parking Jean Bertoin

    E-Print Network [OSTI]

    : Knuth parking scheme, forest fire, phase transition. 1 Introduction The purpose of this work is to point in statistical physics and computer science, namely forest fires and parking schemes. Its motivation partly stems from an interesting paper by R´ath and T´oth [16] in which the authors introduce forest fires

  19. Burning cars in parkings Jean Bertoin

    E-Print Network [OSTI]

    : Knuth parking scheme, forest fire, phase transition. 1 Introduction The purpose of this work is to point in statistical physics and computer science, namely forest fires and parking schemes. Its motivation partly stems from an interesting paper by R´ath and T´oth [15] in which the authors introduce forest fires

  20. Introduction The Bohemian Switzerland National Park and

    E-Print Network [OSTI]

    Introduction The Bohemian Switzerland National Park and the Elbe Sandstone Protected Landscape Area are situated in the north of the Czech Republic at the German border. Together with the Saxon Switzerland National Park and the Saxon SwitzerlandProtectedLandscapeAreainGermany they comprise a unique sandstone

  1. International Development Office Marketing Department, Singleton Park

    E-Print Network [OSTI]

    Aickelin, Uwe

    Marketing Department Singleton Park Swansea Wales, UK SA2 8PP Scholarships 2 Research and Industry Links 3CB Contact Us International Development Office Marketing Department, Singleton Park Swansea, Wales achievement since 1920. Our long history of working closely with industry ensures that our degrees meet

  2. Yes, Parking Reform Is Possible: A progress report from the author of 'The High Cost of Free Parking'

    E-Print Network [OSTI]

    Shoup, Donald

    2011-01-01

    The High Cost of Free Parking, was updated and published ll\\Center UCTC-FR-20| I-2| Yes, Parking Reform Is Possible: Aof The High Cost of Free Parking Donald Shoup University of

  3. Demonstration Assessment of Light-Emitting Diode Parking Structure...

    Office of Scientific and Technical Information (OSTI)

    Parking Structure Lighting at U.S. Department of Labor Headquarters Kinzey, Bruce R.; Myer, Michael solid-state lighting; LEDs; occupancy sensor controls; parking facility lighting...

  4. Agua Calientes Trailer Park Space Heating Low Temperature Geothermal...

    Open Energy Info (EERE)

    Agua Calientes Trailer Park Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Agua Calientes Trailer Park Space Heating Low Temperature Geothermal...

  5. RISK ANALYSIS REPORT FOR THE BAY PARK SEWAGE TREATMENT

    E-Print Network [OSTI]

    Zhang, Minghua

    RISK ANALYSIS REPORT FOR THE BAY PARK SEWAGE TREATMENT PLANT (STP) TR-0 analyzes the flooding risks of the Bay Park Sewage Treatment Plant (STP

  6. Demonstration Assessment of Light-Emitting Diode Parking Structure...

    Office of Scientific and Technical Information (OSTI)

    Parking Structure Lighting at U.S. Department of Labor Headquarters Citation Details In-Document Search Title: Demonstration Assessment of Light-Emitting Diode Parking Structure...

  7. Marine Corps Base Quantico Achieves 85% Savings in Parking Lighting...

    Energy Savers [EERE]

    Marine Corps Base Quantico Achieves 85% Savings in Parking Lighting Marine Corps Base Quantico Achieves 85% Savings in Parking Lighting Marine Corps Base Quantico (MCBQ) in...

  8. Before the Subcommittee on National Parks - Senate Committee...

    Office of Environmental Management (EM)

    National Parks - Senate Committee on Energy and Natural Resources Before the Subcommittee on National Parks - Senate Committee on Energy and Natural Resources Testimony of Ingrid...

  9. Before the House Subcommittee on National Parks Committee on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Parks Committee on Energy and Commerce Before the House Subcommittee on National Parks Committee on Energy and Commerce Testimony of Ingrid Kolb, Director Office of...

  10. Biscayne Park, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-Gas Technologies, LLCMichigan: Energy ResourcesBiscayne Park,

  11. Enhanced Teleoperation for D&D Young S. Park, Hyosig Kang, Thomas F. Ewing

    E-Print Network [OSTI]

    Amaral, Luis A.N.

    Enhanced Teleoperation for D&D Young S. Park, Hyosig Kang, Thomas F. Ewing Nuclear Engineering-based control architecture and cobot control technology. Keywords ­ teleoperation, teleautonomy Platform (DAWP) system for dismantling the CP-5 reactor internals at Argonne National Laboratory. Despite

  12. ‘Neighborhood in a park’ harnesses the sun

    Broader source: Energy.gov [DOE]

    The Minneapolis neighborhood of Bryn Mawr is already a “green” neighborhood in a sense. Called a “neighborhood within a park,” the diverse, middle-class enclave borders on four parks, including the city’s 759-acre flagship Theodore Wirth Park. Over the summer, however, the Bryn Mawr Neighborhood Association (BMNA) launched a program intended to add more metaphorical greenness. Through its Bryn Mawr Solar Program, it’s granting $1,000 to $3,000 to residents and businesses installing solar photovoltaic panels or hot water heaters.

  13. Participatory wildlife surveys in communal lands: a case study from Simanjiro, Tanzania

    E-Print Network [OSTI]

    Participatory wildlife surveys in communal lands: a case study from Simanjiro, Tanzania Fortunata U and Sustainability, University of Edinburgh, Edinburgh EH9 3JN, U.K.; 3 Tanzania National Parks, PO Box 3134, Arusha, Tanzania; 4 Tanzania Wildlife Research Institute, PO Box 661, Arusha, Tanzania; 5 Center for Collaborative

  14. Texas A&M University Parking Garage Master Plan and

    E-Print Network [OSTI]

    ,000 parking spaces in surface lots and five (5) structured parking facilities. The University recognizes of this study was to evaluate the existing Lot 47 / Lot 51 area's ability to accommodate an above grade parking parking structure at Lot 47 is feasible. If the associated costs and impacts are deemed acceptable

  15. Parking Lot Symbols S AN PAS QUAL S T.

    E-Print Network [OSTI]

    Heaton, Thomas H.

    C Parking Lot Symbols LIGO S AN PAS QUAL S T. HOLLISTONAVE. HILLAVE. CALIFORNIA BLVD. DEL MAR BLVD. Caltech Campus Parking Map A B C D E 1 2 3 4 5 MOORE PAS ADENA FIRE S TATION # 34 IMS S BECKMAN AUD PARKING ATHENAEUM PARKING PARKINGPARKING YOUNG HEALTH CENTER RECYCLING CENTER Olive Walk Throop Memorial

  16. The UO Baker Downtown Center Getting Here and Parking

    E-Print Network [OSTI]

    ). Parking is in the lot on your left. · Fromtheeast: If on I-105 westbound, take Exit #2 and follow signs the UO Baker Downtown Center (on the corner of 10th and High). Parking is in the lot on your left Baker Downtown Center (on the corner of 10th and High). Parking is in the lot on your left. PARKING

  17. May 4, 2015 Summer parking permits are now available.

    E-Print Network [OSTI]

    Fairfax Resident Lite permit: $110 *Fairfax Lot M/P: $60 Mason Pond & Shenandoah reserved parking deckContent May 4, 2015 Summer parking permits are now available. Arlington General permit permit: $185 *Rappahannock River reserved parking deck/garage permit: $145 Founders Hall reserved parking

  18. UH Parking Access & Mid-Pacific Institute

    E-Print Network [OSTI]

    ¯noa Bilger Addition Art Building Kuykendall Hall Campus Center CORREA RO A D VISITO R PARKING Jakuan Tea/2 hour in green stalls Weekdays after 4pm, Saturdays, and special events: · $6 flat rate Entrance Kiosk

  19. UH Parking Access & Mid-Pacific Institute

    E-Print Network [OSTI]

    Building Kuykendall Hall Campus Center CORREA RO A D VISITO R PARKING Jakuan Tea House Sinclair Circle before 4pm: · Lower campus - $5 at rate · Upper campus - $2 per 1/2 hour in green stalls Weekdays after 4

  20. Experiencing the Park: Values, Perceptions and Expectations 

    E-Print Network [OSTI]

    Bielby, Paul

    2012-08-31

    user groups experience the Cairngorms National Park. With a primary focus on hill walkers that climb the area’s many hills, and using qualitative interviews and ethnographic methods, the study, therefore, investigates the values, experiences...

  1. The Access Almanac: Solar Parking Requirements

    E-Print Network [OSTI]

    Shoup, Donald

    2012-01-01

    to think about getting solar power from our parking lots. ?the sun shines brightest, solar power accounts for less thanlots? They can incorporate solar power into their off-street

  2. Microsoft Word - OakParkECDList.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Park ECD Dance List (most recent at top) 1 6-15-15 Callers: Tammy Bretscher, Mady Newfield Music: recorded music Turning by Threes I Care Not for these Ladies Upon a Summer's Day...

  3. Walmart Sees the Light for Parking Lots

    Office of Energy Efficiency and Renewable Energy (EERE)

    I don't think about parking lots often. Hot in the summer and jammed with frantic shoppers during holidays, I try to spend as little time in them as possible. But because my passion is energy...

  4. Holyrood Park Stone Tools Mobile Android 

    E-Print Network [OSTI]

    Goetz, Danielle

    2014-08-31

    and Edinburgh Museum with the landscape of Holyrood Park through the creation of an Android application. This application, HPST, will assist the public to learn about the artefact records by visualizing the artefacts’ locations, images, videos and site records...

  5. Graph searching and a generalized parking function 

    E-Print Network [OSTI]

    Kostic, Dimitrije Nenad

    2009-05-15

    Parking functions have been a focus of mathematical research since the mid-1970s. Various generalizations have been introduced since the mid-1990s and deep relationships between these and other areas of mathematics have ...

  6. Performance Modeling of Intelligent Car Parking Systems

    E-Print Network [OSTI]

    Telek, Miklós

    introduction at the beginning of the century [2], the smart city concept enjoys an enormous attention from. In an intelligent car parking system the driver selects its destination on a smart- phone application when entering

  7. Urban Parks: Volunteers and Civic Engagement 

    E-Print Network [OSTI]

    Schuett, Michael A.

    2007-03-02

    When citizens are engaged with urban park and recreation departments, everyone benefits. This publication describes successful programs that involve community volunteers, and explains what managers can do to engage citizens in such programs....

  8. Sustainable Housing for Park Rangers in Big Bend National Park, Texas 

    E-Print Network [OSTI]

    Garrison, M.; Griswold, S.

    1996-01-01

    by the National Park Service, design teams in the joint project have developed permanent sustainable housing responsive to the hot-arid desert climate....

  9. Jackson Park Hospital Green Building Medical Center

    SciTech Connect (OSTI)

    William Dorsey; Nelson Vasquez

    2010-03-01

    Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago�s recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work.

  10. Permit Types, Tiers, and Parking Privileges 2014-2015 Permit Type/Neighborhood Permit Tier Parking Privileges

    E-Print Network [OSTI]

    Chen, Tsuhan

    Privileges A (North Campus A Lot) Outer A lot on North Campus AP (Accessible Campus-wide Parking) ValidPermit Types, Tiers, and Parking Privileges 2014-2015 Permit Type/Neighborhood Permit Tier Parking in all permit-restricted parking spaces except reserved. Not valid in MT spaces. Must comply with posted

  11. Parking and Directions The EECS building is located at P8 and the nearest visitor parking lots are the

    E-Print Network [OSTI]

    Cafarella, Michael J.

    Parking and Directions The EECS building is located at P8 and the nearest visitor parking lots Express, Discover, MasterCard and VISA). If you have a blue or gold UM parking permit, please park in lot are the red lots located at N7 (2260 Hayward Street, Ann Arbor MI 48109) and N8 (1226 Murfin Ave, Ann Arbor MI

  12. University of Aberdeen Car Parking Policy -v2.0.docx University of Aberdeen Car Parking Policy

    E-Print Network [OSTI]

    Neri, Peter

    University of Aberdeen Car Parking Policy - v2.0.docx University of Aberdeen Car Parking Policy 1.0 Why have a car parking policy? The University of Aberdeen is aware of the importance of corporate. The University has developed to such an extent that its current car park capacity is not sufficient to provide

  13. Accuracy Requirements for Rural Land Parcel Boundaries

    E-Print Network [OSTI]

    Stock, Kristin

    Accuracy Requirements for Rural Land Parcel Boundaries Kristin M. Stock School of Planning accuracy of about +/-0.2m. Utilities companies and local authorities in rural areas have more relaxed of Planning, Landscape Architecture and Surveying at Queensland University of Technology, and the Geodetic

  14. 2 0 1 5 -2 0 1 6 R E N E W A L F O R M PARKING (check only one)PARKING (check only one)PARKING (check only one)PARKING (check only one)

    E-Print Network [OSTI]

    Weber, David J.

    this box, I am indicating that I would like to enter into the parking lottery for a space in the lot(s2 0 1 5 - 2 0 1 6 R E N E W A L F O R M FAYETTE SQUARE PARKING (check only one)PARKING (check only one)PARKING (check only one)PARKING (check only one) By checking this box, I am indicating that I plan

  15. 15A Staff parking 15C Disabled parking

    E-Print Network [OSTI]

    Glasser, Adrian

    Pavilion SEC Building - overflow area College of Architecture TDECU Stadium Cullen Performance Hall Hilton Performance Hall 2 - 4 p.m. Conrad N. Hilton College of Hotel and Restaurant Management College of Technology D. Hines College of Architecture Convocation Ceremony Architecture Building UniverSity Commen

  16. Hawaii Volcanoes National Park Traffic and Parking: Current Issues, Future Solutions Hawaii Volcanoes National Park (HAVO) is experiencing increased visitor use and congestion/

    E-Print Network [OSTI]

    Prevedouros, Panos D.

    Hawaii Volcanoes National Park Traffic and Parking: Current Issues, Future Solutions Hawaii, and unsafe practices. This project will record and analyze these issues. NPS staff and University of Hawaii

  17. Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

    SciTech Connect (OSTI)

    Garland, Sid; Brown, Sally; Sims, Lynn [Restoration Services, Inc., P.O. Box 4699, Oak Ridge, Tennessee 37831 (United States)] [Restoration Services, Inc., P.O. Box 4699, Oak Ridge, Tennessee 37831 (United States); Darby, Jason [U.S. Department of Energy, Office of Environmental Management, Oak Ridge Site (United States)] [U.S. Department of Energy, Office of Environmental Management, Oak Ridge Site (United States)

    2013-07-01

    Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

  18. ParkNet: A Mobile Sensor Network for Harvesting Real Time Vehicular Parking Information

    E-Print Network [OSTI]

    Gruteser, Marco

    of wasted gas. A recent study [2] indicated that up to 45% of traffic on some streets in New York City by municipal- ities in the ground or in parking meters. This necessitates a large fixed cost of installation of the problem in large cities and the governerment's dedication to long term investments in a smart parking

  19. The Social Life of Steeplechase Park: Neighborhood Dog-Park as a "Third Place 

    E-Print Network [OSTI]

    Gulati, Nidhi 1986-

    2012-12-11

    that in the American suburbs, neighborhood parks have the potential to serve as ‘third places.’ The twofold purpose of this research was to examine Steeplechase dog-park using Oldenburg’s Third Place construct as a starting point; and then to operationalize third place...

  20. Parking Requirements and Housing Development: Regulation and Reform in Los Angeles

    E-Print Network [OSTI]

    Manville, Michael

    2014-01-01

    Michael Manville. 2013. “Parking Requirements and HousingPolicy Debate, 23(2): Minimum parking requirements address athe demand for off-street parking), but also tell developers

  1. Less Parking, More Carsharing: Supporting Small-Scale Transit-Oriented Development

    E-Print Network [OSTI]

    Dentel-Post, Colin

    2012-01-01

    strategies  to   reduce  parking  requirements  while  demand  for  street  parking.   BIBLIOGRAPHY   AC  23E.28.090  In-­?lieu  Parking  Fee.   Retrieved  from  

  2. Pricing Our Way Out of Traffic Congestion: parking cash out and HOT lanes

    E-Print Network [OSTI]

    Shoup, Donald C.; Brown, Jeffrey

    2001-01-01

    Opportunity to Reduce Minimum Parking Requirements," JournalOpportunity to Reduce Minimum Parking Requirements," Journalof Traffic Congestion: Parking Cash Out and HOTLanes Donald

  3. Parking requirements as a barrier to housing development: regulation and reform in Los Angeles

    E-Print Network [OSTI]

    Manville, Michael; Shoup, Donald C

    2010-01-01

    Renaissance resulting in parking shortage. Los AngelesJakle, Scully 2004. Lots of Parking. University of VirginiaDonald Shoup. 2005. People, Parking and Cities. Journal of

  4. Less Parking, More Carsharing: Supporting Small-Scale Transit-Oriented Development

    E-Print Network [OSTI]

    Dentel-Post, Colin

    2012-01-01

    to  measuring  residential  parking  demand  in  transit  a  portion  of   residential  parking  demand.   Station  will  meet  residential  parking  demand   will  be  met  

  5. Local People, National Parks, and International Conservation Movements: Conflicts over Nature in Southeast Asia

    E-Print Network [OSTI]

    Rodriguez, Steven Martin

    2013-01-01

    tourism industry); special developments around parks, e.g.ecotourism industry in and around the park. Hashim had beenover the timber industry. National parks were created in all

  6. Promising Technology: Parking Lot Light-Emitting Diodes with Controls

    Broader source: Energy.gov [DOE]

    LEDs offer several advantages over conventional high intensity discharge (HID) luminaires. LEDs have longer life times, reduced maintenance and operating costs, superior color rendition, and lower energy consumption.

  7. Enterprise Assessments Review of the East Tennessee Technology Park

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor Innovative SolarSavingsAugustHanford SiteProtection Program -

  8. Saratoga Technology Energy Park STEP | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg,EnergyEastCarbonOpen EnergyPonsa, Mallorca:Eneos

  9. East Tennessee Technology Park Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatementofApril 25,EV Everywhere| Department

  10. Vehicle Technologies Office: AVTA - Evaluating National Parks and Forest

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedofDepartmentVOICESEnergy 21st Century

  11. Sandia Energy - Sandia Science & Technology Park: Acquisition of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)Geothermal EnergyRenewableCompanies Pilot ProgramCSP:ELEMENTS

  12. Parks, Arizona: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio Program |View NewParatek Microwave IncParkeParks, Arizona: Energy

  13. Parking and Garage | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data CenterFinancialInvesting inServices »About Us »Parking and Garage Parking

  14. An exploration of the relationship between use of parks and access, park appeal, and communication effectiveness 

    E-Print Network [OSTI]

    Walker, Jamie Rae

    2009-05-15

    city life (Edinton et al., 1995). During the rise of the Industrial era, parks were also seen as an opportunity to allow people to get out of the factories to socialize with other community members and to engage in physical activity. In today?s...-1 AN EXPLORATION OF THE RELATIONSHIP BETWEEN USE OF PARKS AND ACCESS, PARK APPEAL, AND COMMUNICATION EFFECTIVENESS A Dissertation by JAMIE RAE WALKER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment...

  15. U.S. Organizations Recognized for Cutting Parking Facility Energy...

    Energy Savers [EERE]

    U.S. Organizations Recognized for Cutting Parking Facility Energy Use by 60 Percent U.S. Organizations Recognized for Cutting Parking Facility Energy Use by 60 Percent June 29,...

  16. Cambridge in transition : regulating parking in a growing city

    E-Print Network [OSTI]

    Ferrentino, Cara Elizabeth

    2013-01-01

    Parking is regulated today by cities to achieve a variety of goals including traffic reduction, air quality improvement, urban densification, and climate change mitigation. In the City of Cambridge, Massachusetts, parking ...

  17. Central Park in New York City Myer, Michael; Goettel, Russell...

    Office of Scientific and Technical Information (OSTI)

    (LED) Post-Top Lighting at Central Park in New York City Myer, Michael; Goettel, Russell T.; Kinzey, Bruce R. GATEWAY; Central Park; lighting; LED; light-emitting diode; post-top...

  18. Environmental Impacts of Tourism in Khao Yai National Park, Thailand 

    E-Print Network [OSTI]

    Phumsathan, Sangsan

    2011-10-21

    Knowledge of visitor impacts is critical for sustainable tourism management in national parks. The focus of past tourism impact research on national parks is either on bio-physical impacts (conducted as recreation ecology research) or on social...

  19. Urban mechanics : the parking garage as an instrument of legibility

    E-Print Network [OSTI]

    Martinez, Marcus E. (Marcus Eugene)

    2012-01-01

    No typology has fragmented urban space more than the parking garage. In fact, the city of Houston's parking contingent practice has a resulted in a garage on 30% of the downtown district.The range from a few underground ...

  20. The impact of international logistics parks on global supply chains

    E-Print Network [OSTI]

    El Amrani, Ali (Ali El Jautei)

    2007-01-01

    With the globalization of industries since the 1980's, logistics parks have emerged as a solution for the consolidation of operations and logistics services for global companies. In the beginning, logistics parks were ...

  1. EECBG Success Story: Sundance, Skiing and Solar: Park City to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sundance, Skiing and Solar: Park City to Install New PV System EECBG Success Story: Sundance, Skiing and Solar: Park City to Install New PV System October 25, 2010 - 3:53pm Addthis...

  2. Title: Canada Land Inventory: Land Capability for Agriculture Data Creator /

    E-Print Network [OSTI]

    , Ontario, Prince Edward Island, Quebec, Saskatchewan Keywords (Subject): Land Use, Soils, Agriculture

  3. Title: Canada Land Inventory: Land Capability for Forestry Data Creator /

    E-Print Network [OSTI]

    , Ontario, Prince Edward Island, Quebec, Saskatchewan #12;Keywords (Subject): Land Use, Soils, Vegetation

  4. Sixth American Nuclear Society International Topical Meeting on Nuclear Plant Instrumentation, Control, and Human-Machine Interface Technologies NPIC&HMIT 2009, Knoxville, Tennessee, April 5-9, 2009, on CD-ROM, American Nuclear Society, LaGrange Park, IL

    E-Print Network [OSTI]

    Heljanko, Keijo

    , automation 1 INTRODUCTION In nuclear power plants (NPPs), novel digitalized I&C systems enable complicatedSixth American Nuclear Society International Topical Meeting on Nuclear Plant Instrumentation, on CD-ROM, American Nuclear Society, LaGrange Park, IL (2009) VERIFICATION OF SAFETY LOGIC DESIGNS

  5. MHK Projects/Del Mar Landing | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource HistoryScenarios Towards 2050 JumpCoos Bay OPT Wave Park <EnergyMar Landing

  6. Lot Times & After Hour Parking Policy Definition & Purpose

    E-Print Network [OSTI]

    Emshwiller, Eve

    Lot Times & After Hour Parking Policy Definition & Purpose This policy establishes standard Lot times, (2) establish consistent lot times, and (3) provide balance for after hours parking needs (public Police, and will annually review placement of lots in categories. · Parking is restricted to marked

  7. woodlane walkway Car Park 5a to close

    E-Print Network [OSTI]

    NO ENT RY NO ENT RY New Track Light New Track Light woodlane walkway Car Park 5a to close 9th to remain open Existing Barrier No change Observatory Car Park Car ParkNew Carpark CP6 CP3 CP5a Sports

  8. A BAYESIAN HIERARCHICAL DETECTION FRAMEWORK FOR PARKING SPACE DETECTION

    E-Print Network [OSTI]

    Chen, Tsuhan

    University, Hsinchu, Taiwan. 2 Department of Electrical and Computer Engineering, Carnegie Mellon University problem come from luminance variations, inter- occlusions among cars, and occlusions caused to the parking space detection problem, the available parking spaces and the labeling of parked cars can

  9. Welcome to the Gene Therapy program. Parking and Driving instructions.

    E-Print Network [OSTI]

    GRAVIER ST. Turn RIGHT into parking lot on the corner of GRAVIER ST and ROMAN ST. (C) Option 1 Please call OPTIONS: Up to 2 hour parking Turn LEFT onto POYDRAS ST. Turn RIGHT onto BOLIVAR ST. Merv Trail Clinical Sciences Research Building (A) is the second building on the right in the second block. Street parking

  10. The use of molecular tools in Parks Canada Agency

    E-Print Network [OSTI]

    Blouin-Demers, Gabriel

    species inventory knowledge is crucial for park management and biodiversity monitoring #12;Outline of genetics to preserve species as dynamic entities ..." · "a mixture of ecology, molecular biology restoration Protected areas management #12;Parks Canada and conservation · Parks Canada is a world leader

  11. SECTION ELEVEN Site Design Guidelines Parking

    E-Print Network [OSTI]

    Stuart, Steven J.

    to assist in reducing heat island effects and to create a pedestrian scale. A. Landscaping to heat the pavement. · Help make parking lots an aesthe c asset to the campus. · Shall have a minimum be located in curbed medians (with a minimum width of 10') or curbed islands (with a minimum width of 9

  12. New Mexico State University Transportation & Parking Services

    E-Print Network [OSTI]

    Johnson, Eric E.

    New Mexico State University Transportation & Parking Services Fuel Key TPS-Fuel-Key.pdf, 05 #:Entered into Trak by: ROUTING TPS, MSC 3PAR transport@nmsu.edu Phone 646-7111 Fax 646-1756 Note: ALL fuel purchases require an accurate odometer/hour reading to be entered at the time of dispensing fuel at the NMSU

  13. Geology of the Shenandoah National Park Region

    E-Print Network [OSTI]

    Eaton, L. Scott

    1 Geology of the Shenandoah National Park Region 39th Annual Virginia Geological Field Conference October 2nd - 3rd, 2009 Scott Southworth U. S. Geological Survey L. Scott Eaton James Madison University Meghan H. Lamoreaux College of William & Mary William C. Burton U. S. Geological Survey Christopher M

  14. Directions & Parking School of Information Studies

    E-Print Network [OSTI]

    Crowston, Kevin

    Directions & Parking School of Information Studies Syracuse University ­ Hinds Hall 100 University Street will be on your right.) Take Adams Street up the hill until it dead ends into Ostrom Avenue Take a right on Ostrom Avenue Take a right on Euclid Avenue Continue on Euclid across Comstock Avenue

  15. Creating Standards for Winter Terrain Parks

    E-Print Network [OSTI]

    to engineering frame motivated creation of a 501c(3) non-profit, United States Terrain Park Council Dedicated fatalities (31 male, 6 female) mostly young J. Shealy (2000) Snowboard injury rate doubled during 1990-2000 from 3.37 to 6.97 per 1000 skier days Deaths: 50 (2007-2008) 39 (2008-2009) Compiled by California Ski

  16. ConstitutionAve. CityParkAve.

    E-Print Network [OSTI]

    Zhou, Yongcheng

    ConstitutionAve. CityParkAve. SkylineDr. West Plum St. West Elizabeth St. International House 1400 Environmental Research Center Greenhouse Animal Sciences Morgan Library Natural Resources Lagoon Arthur Ditch Center A College Avenue Gym Field House National Center for Genetic Resources Preservation Alder Hall

  17. Isle Royale National Park Bibliography of Publications 1 Isle Royale National Park

    E-Print Network [OSTI]

    ). 14:1-63. Armentano, T. V. and O. L. Loucks. 1983. Air pollution threats to US National Parks of the Great Lakes region. Environmental conservation. 10:303-313. Assel, R. A. 1986. Fall and winter thermal

  18. Assessment of Soil Erosion at a DC Park Facility Spring Valley Park

    E-Print Network [OSTI]

    District of Columbia, University of the

    park for the pilot assessment study. Failure to control erosion caused by the runoff of rain water can of Columbia Date: May 2005 Prepared for the DC Water Resources Research Institute Funded by USGS through

  19. 6C2R-2.009. Parking and Traffic Regulations. (1)-(2) No Change

    E-Print Network [OSTI]

    McQuade, D. Tyler

    illegally on University property to include but not limited to: no permit in restricted lots, parking for space, parking in a restricted or reserved lot, improper parking in a loading zone, parking on lawns1 6C2R-2.009. Parking and Traffic Regulations. (1)- (2) No Change (3) Parking Fees and Penalties

  20. Pomona Skate Park A Place for Skateboarders to Have Fun: Legally

    E-Print Network [OSTI]

    Young, Terence

    have an impact on crime? The focus of this narrative is on Pomona skate park at Palomares Park some insight as to how well the neighborhood surrounding Palomares Park has fared since the inception of the Skate Park in 2003. MLK Park has a small skateboard area and lies geographically opposite Palomares Park

  1. The parking policy and smart growth disconnect : obstacles to establishing and implementing smart growth parking policy

    E-Print Network [OSTI]

    Richardson, Heather Eileen Seyfang

    2005-01-01

    Urban areas are plagued by congestion, economic inequality, and inefficient land use that result from highway and single family housing subsidies, segregated land uses, and many other government policies established over ...

  2. Copyright Office of Information Technology, University of Maryland Campus Pack

    E-Print Network [OSTI]

    Yorke, James

    Copyright © Office of Information Technology, University of Maryland Campus Pack Blogs of Maryland College Park Spring 2015 #12;#12;1 Contents Introduction to Campus Pack Blogs Blog, Wiki, or Journal to an ELMS Course Space......................................... 3

  3. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect (OSTI)

    David Brien

    2012-06-21

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  4. Future land use plan

    SciTech Connect (OSTI)

    NONE

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  5. Land-use Leakage

    SciTech Connect (OSTI)

    Calvin, Katherine V.; Edmonds, James A.; Clarke, Leon E.; Bond-Lamberty, Benjamin; Kim, Son H.; Wise, Marshall A.; Thomson, Allison M.; Kyle, G. Page

    2009-12-01

    Leakage occurs whenever actions to mitigate greenhouse gas emissions in one part of the world unleash countervailing forces elsewhere in the world so that reductions in global emissions are less than emissions mitigation in the mitigating region. While many researchers have examined the concept of industrial leakage, land-use policies can also result in leakage. We show that land-use leakage is potentially as large as or larger than industrial leakage. We identify two potential land-use leakage drivers, land-use policies and bioenergy. We distinguish between these two pathways and run numerical experiments for each. We also show that the land-use policy environment exerts a powerful influence on leakage and that under some policy designs leakage can be negative. International “offsets” are a potential mechanism to communicate emissions mitigation beyond the borders of emissions mitigating regions, but in a stabilization regime designed to limit radiative forcing to 3.7 2/m2, this also implies greater emissions mitigation commitments on the part of mitigating regions.

  6. Energy and land use

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This report addresses the land use impacts of past and future energy development and summarizes the major federal and state legislation which influences the potential land use impacts of energy facilities and can thus influence the locations and timing of energy development. In addition, this report describes and presents the data which are used to measure, and in some cases, predict the potential conflicts between energy development and alternative uses of the nation's land resources. The topics section of this report is divided into three parts. The first part describes the myriad of federal, state and local legislation which have a direct or indirect impact upon the use of land for energy development. The second part addresses the potential land use impacts associated with the extraction, conversion and combustion of energy resources, as well as the disposal of wastes generated by these processes. The third part discusses the conflicts that might arise between agriculture and energy development as projected under a number of DOE mid-term (1990) energy supply and demand scenarios.

  7. Green Lands Blue Water 2014 Fall Conference

    Broader source: Energy.gov [DOE]

    The Green Lands Blue Water 2014 Fall Conference will be held from November 19–20, 2014, at the Richland Community College in Decatur, Illinois. The event will focus on bioenergy and sustainable agriculture and explore topics ranging from logistics, energy conversion technologies, and markets for grass biomass. BETO Sustainability Program Technology Manager Kristen Johnson will be speaking about the Energy Department’s perspective on sustainable bioenergy landscapes and will focus on BETO’s recent work with landscape design. The conference will be November 19–20 only. On November 18, participants may choose to participate in a pre-conference field tour.

  8. The Lunar Cherenkov Technique: From Parkes Onwards

    E-Print Network [OSTI]

    C. W. James; R. D. Ekers; R. A. McFadden; R. J. Protheroe

    2007-09-03

    The lunar Cherenkov technique, which aims to detect the coherent Cherenkov radiation produced when UHE particles interact in the lunar regolith, was first attempted with the Parkes radio-telescope in 1995, though the theory was not sufficiently developed at this time to calculate a limit on the UHE neutrino flux from the non-observation. Since then, the technique has evolved to include experiments utilising lower frequencies, wider bandwidths, and entire arrays of antenna. We develop a simulation to analyse the full range of experiments, and calculate the UHE neutrino flux limit from the Parkes experiment, including the directional dependence. Our results suggest a methodology for planning future observations, and demonstrate how to utilise all available information on the nature of radio pulses from the Moon for the detection of UHE particles.

  9. Bexar County Parking Garage Photovoltaic Panels

    SciTech Connect (OSTI)

    Golda Weir

    2012-01-23

    The main objective of the Bexar County Parking Garage Photovoltaic (PV) Panel project is to install a PV System that will promote the use of renewable energy. This project will also help sustain Bexar County ongoing greenhouse gas emissions reduction and energy efficiency goals. The scope of this project includes the installation of a 100-kW system on the top level of a new 236,285 square feet parking garage. The PV system consists of 420 solar panels that covers 7,200 square feet and is tied into the electric-grid. It provides electricity to the office area located within the garage. The estimated annual electricity production of the PV system is 147,000 kWh per year.

  10. Random parking, Euclidean functionals, and rubber elasticity

    E-Print Network [OSTI]

    Antoine Gloria; Mathew D. Penrose

    2012-03-06

    We study subadditive functions of the random parking model previously analyzed by the second author. In particular, we consider local functions $S$ of subsets of $\\mathbb{R}^d$ and of point sets that are (almost) subadditive in their first variable. Denoting by $\\xi$ the random parking measure in $\\mathbb{R}^d$, and by $\\xi^R$ the random parking measure in the cube $Q_R=(-R,R)^d$, we show, under some natural assumptions on $S$, that there exists a constant $\\bar{S}\\in \\mathbb{R}$ such that % $$ \\lim_{R\\to +\\infty} \\frac{S(Q_R,\\xi)}{|Q_R|}\\,=\\,\\lim_{R\\to +\\infty}\\frac{S(Q_R,\\xi^R)}{|Q_R|}\\,=\\,\\bar{S} $$ % almost surely. If $\\zeta \\mapsto S(Q_R,\\zeta)$ is the counting measure of $\\zeta$ in $Q_R$, then we retrieve the result by the second author on the existence of the jamming limit. The present work generalizes this result to a wide class of (almost) subadditive functions. In particular, classical Euclidean optimization problems as well as the discrete model for rubber previously studied by Alicandro, Cicalese, and the first author enter this class of functions. In the case of rubber elasticity, this yields an approximation result for the continuous energy density associated with the discrete model at the thermodynamic limit, as well as a generalization to stochastic networks generated on bounded sets.

  11. Using the National Environmental Policy Act to facilitate the transfer of federal lands for economic development

    SciTech Connect (OSTI)

    Ladino, A.G.

    1997-06-01

    In order to evaluate the transfer of certain Federal lands at Los Alamos National Laboratory (LANL), the US Department of Energy (DOE) determined that the proposed action had the potential to result in environmental impacts and required the preparation of an Environmental Assessment under the National Environmental Policy Act (NEPA). The specific proposed action evaluated by DOE with support from LANL was the transfer of approximately 28 contiguous acres of underutilized Federal land to the County. This tract was locally referred to as the DP Road tract. Although the land was underutilized, it functioned as part of a larger buffer area between potentially hazardous operations at LANL and the general public. The tract was covered with scrub vegetation. There were no government buildings located on the site. The tract of land had two Resource Conservation and Recovery Act (RCRA) Solid Waste Management Units (SWMUs) located within the tract boundary as well as a buried but active liquid radioactive waste pipeline that crossed the site. The tract of land was adjacent to several other DOE SWMUs as well as a public road. In addition, there were ownership issues pertaining to the transfer of the land to persons and agencies other than the County. This particular tract of land was being considered for transfer to the County at the same time DOE and LANL began evaluating another large Federal land tract for lease to the County to be developed as a private research park.

  12. Finding GIS data: Land cover and land use in Kansas

    E-Print Network [OSTI]

    Houser, Rhonda

    2006-12-08

    classes with no key to indicate class descriptions. The student understands how human actions modify the physical environment. The student helps create both a hard copy and digital pie chart that shows relative land cover class areas. The student... helps create a digital pie chart that shows relative land cover class areas. The student helps create a pie chart by hand that shows relative land cover class areas. The student creates e a pie chart by hand that shows relative land cover class...

  13. Library and Information Technology Final Report Fred Heath -Dean & Director, Sterling C. Evans Library, On-Campus Co-Chair

    E-Print Network [OSTI]

    Library and Information Technology Final Report Members Fred Heath - Dean & Director, Sterling C Provost for Information Technology, and Associate Professor, Department of Electrical Engineering, Sterling C. Evans Library M. Michael Park - Attorney at Law Linda Parrish '78 - Professor, Department

  14. Stumped by Detroit's Vacant Land Process?

    E-Print Network [OSTI]

    Fischer, Lucia; Kiani, Naria; O'Brien-Kovari, Lilly; Ordower, Aaron

    2014-01-01

    Stumped by Detroit's Vacant Land Process?Illustrating the Role of the Detroit Land Bank AuthorityLos Angeles STUMPED BY DETROIT’S VACANT LAND PROCESS?

  15. Sandia Energy - Bureau of Land Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bureau of Land Management Home Climate & Earth Systems Sustainable Subsurface Energy Development Program Leadership Bureau of Land Management Bureau of Land ManagementMaelyn...

  16. Procedure for Managing Account Information at Parking Online 1. Go to Parking Services webpage at http://www.uaf.edu/parking.

    E-Print Network [OSTI]

    Ickert-Bond, Steffi

    Procedure for Managing Account Information at Parking Online 1. Go to Parking Services webpage Add an Address and fill in asterisked information and select Submit Manage Your Email Addresses Select Add an Address and fill in asterisked information and select Submit Manage Your Vehicles Select

  17. Chennai Urban Land Market Assessment

    E-Print Network [OSTI]

    Dowall, David E; Monkkonen, Paavo

    2007-01-01

    for 2003 and 2004 land price data (Tables 13 and 14), adding25 Table 12: Price Gradient Regression Results for35 Table 15: Average Price of Land in Residential Plots and

  18. Feasibility Study of Economics and Performance of Solar PV at the Atlas Industrial Park in Duluth, Minnesota

    SciTech Connect (OSTI)

    Steen, M.; Lisell, L.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. The EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installation and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site.

  19. Land parcel fragmentation in the agricultural frontier: Sierra del Lacandn National Park, Guatemala

    E-Print Network [OSTI]

    Lopez-Carr, David

    , Guatemala Laurel K. Suter David L. Carr Department of Geography University of California, Santa Barbara are often viewed as the primary proximate agents of deforestation (Rudel and Roper 1996; Carr 2005). Although population growth is positively associated with agricultural expansion in Latin America (Carr

  20. South Florida Sun-Sentinel.com Boynton Beach swaps park land for local jobs

    E-Print Network [OSTI]

    Fernandez, Eduardo

    have an eco-friendly design, city Public Works Director Jeff Livergood said. The developer would pay

  1. File:03-TX-e - Lease of Texas Parks & Wildlife Department Land (1).pdf |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbHFarinello GeothermalFiderisInformation 3-FD-d -Open Energy

  2. Before the House Subcommittee on National Parks, Forests and Public Lands -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:I DueBETO Quiz - InteractiveDepartment ofandCommerce

  3. An exploratory survey on community use of park exactions 

    E-Print Network [OSTI]

    Groger, Susan May

    1988-01-01

    Major Subject: Recreation and Resources Development AN EXPLORATORY SURVEY ON COMMUNITY USE OF PARK EXACTIONS A Thesis SUSAN MAY GROGER Approved as to style and content by: Ronald A. Kaiser Robert B. litton (Member) Davi . h (Member) &lb' ~ ~J... An infrastructure crisis confronts growing communities in their provision of park and recreation facilities. In response, local governments are developing alternatives to traditional techniques of financing these capital improvements. Through the use of park...

  4. ORIGINAL ARTICLE Building sustainable parking lots with the Web of Things

    E-Print Network [OSTI]

    Sheng, Michael

    ORIGINAL ARTICLE Building sustainable parking lots with the Web of Things Sujith Samuel Mathew and sustainable environments like parking lots, which provide motorists with access to convenient parking spots. We present a scalable parking lot network infrastructure that exposes parking management operations

  5. GOODBYE TO FACULTY & STAFF PARKING LOT H HELLO TO ACADEMIC VII BUILDING

    E-Print Network [OSTI]

    GOODBYE TO FACULTY & STAFF PARKING LOT H HELLO TO ACADEMIC VII BUILDING What are my Parking & Human Services (Academic VII), Parking Lot H will be soon be closed. Design and construction details to you starting with those options closest to Lot H: Parking Options General Lot Parking Permit: If you

  6. Car Parking Regulations_09.05.13_SGD University of St Andrews

    E-Print Network [OSTI]

    Brierley, Andrew

    Car Parking Regulations_09.05.13_SGD University of St Andrews Estates Car Parking Regulations Commencement and Citation These Regulations may be cited as the University of St Andrews Car Parking September in any year. 1. Car Parking Regulations 1.1 No person shall park a vehicle within a University

  7. Demolition/Construction to Close Parking Areas Near Accelerator...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DemolitionConstruction to Close Parking Areas Near Accelerator Site Entrance Demolition of the two Radiation Control Department trailers and Building 52 is expected to begin on...

  8. University Park Summary of Reported Data | Department of Energy

    Energy Savers [EERE]

    Park Summary of Reported Data More Documents & Publications NYSERDA Summary of Reported Data New Hampshire Summary of Reported Data Virginia -- SEP Summary of Reported Data...

  9. Surface Gas Sampling At Lassen Volcanic National Park Area (Janik...

    Open Energy Info (EERE)

    Surface Gas Sampling At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Surface Gas...

  10. MANHATTAN PROJECT NATIONAL HISTORICAL PARK | Department of Energy

    Energy Savers [EERE]

    Secretaries of Energy A Brief History of the Energy Department Historical Resources DOE History Timeline Manhattan Project Manhattan Project National Historical Park The...

  11. Application Assessment of Bi-Level LED Parking Lot Lighting

    SciTech Connect (OSTI)

    None

    2009-02-01

    This report summarizes an assessment project conducted to evaluate light-emitting diode (LED) luminaires with bi-level operation in an outdoor parking lot application.

  12. Data Acquisition-Manipulation At Lassen Volcanic National Park...

    Open Energy Info (EERE)

    Data Acquisition-Manipulation At Lassen Volcanic National Park Geothermal Area (1982) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data...

  13. Static Temperature Survey At Lassen Volcanic National Park Area...

    Open Energy Info (EERE)

    Static Temperature Survey At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Static...

  14. Energy Department and National Park Service Announce Clean Cities...

    Energy Savers [EERE]

    And there are multiple benefits - we use less petroleum which saves money and reduces air pollution in America's national parks. Some of these alternative fuel vehicles are...

  15. Compound and Elemental Analysis At Lassen Volcanic National Park...

    Open Energy Info (EERE)

    Usefulness not indicated DOE-funding Unknown References J. Michael Thompson (1985) Chemistry Of Thermal And Nonthermal Springs In The Vicinity Of Lassen Volcanic National Park...

  16. National Parks Move Forward on Sustainable Transportation in...

    Energy Savers [EERE]

    vehicle idling. In partnership with Clean Cities, a number of National Parks are adopting alternative fuel and plug-in electric vehicles. To minimize carbon pollution and other...

  17. Teleseismic-Seismic Monitoring At Lassen Volcanic National Park...

    Open Energy Info (EERE)

    Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity:...

  18. Before the House Subcommittee on National Parks, Forests and...

    Broader source: Energy.gov (indexed) [DOE]

    on Natural Resources By: Ingrid Kolb, Director Office of Management Subject: Proposed Manhattan Project National Historical Park Microsoft Word - 6.28.12 MA Final Testimony...

  19. Aggressive landing maneuvers for unmanned aerial vehicles

    E-Print Network [OSTI]

    Bayraktar, Selcuk

    2006-01-01

    VTOL (Vertical Take Off and Landing) vehicle landing is considered to be a critically difficult task for both land, marine, and urban operations. This thesis describes one possible control approach to enable landing of ...

  20. National Wind Technology Center to Debut New Dynamometer (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01

    New test facility will be used to accelerate the development and deployment of next-generation offshore and land-based wind energy technologies.

  1. The Parkes Multibeam Pulsar Survey Data Release

    E-Print Network [OSTI]

    J. Bell; R. Manchester; F. Crawford; A. Lyne; F. Camilo; V. Kaspi; I. Stairs; D. Morris; N. D'Amico; N. McKay; M. Kramer; D. Sheppard; A. Possenti

    1999-11-17

    The Parkes multibeam pulsar survey began in 1997 and is now about 50% complete. It has discovered more than 400 new pulsars so far, including a number of young, high magnetic field, and relativistic binary pulsars. Early results, descriptions of the survey and follow up timing programs can be found in papers by Lyne et al. (1999 MNRAS in press, astro-ph/9911313), Camilo et al. (astro-ph/9911185), and Manchester et al. (astro-ph/9911319). This paper describes the data release policy and how you can gain access to the raw data and details on the pulsars discovered.

  2. The Parkes Multibeam Pulsar Survey: preliminary results

    E-Print Network [OSTI]

    N. D'Amico; A. G. Lyne; R. N. Manchester; F. M. Camilo; V. M. Kaspi; J. Bell; I. H. Stairs; F. Crawford; D. Morris; A. Possenti

    1999-11-26

    A high-frequency survey of the Galactic plane for radio pulsars is in progress, using the multibeam receiver on the 64-m Parkes radiotelescope. We describe the survey motivations, the observing plan and the inital results. The survey is discovering many pulsars, more than 500 so far. Eight of the new pulsars are binary, one with a massive companion. At least eight are young, with characteristic ages of less than 100 kyr. Two of these (Kaspi et al, this Conference) have surface dipole magnetic field strengths greater than any other known radio pulsar.

  3. Burris Park, California, Site Fact Sheet

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and Myers Co -VANaval ,, *' ; . Final loBurris Park,

  4. Eden Park Illumination | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbH Jump to:Providence, RhodeEcholsCryogenics LLC formerly BrehonPark

  5. Mountain Parks Electric, Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: EnergyInformationOliver, Pennsylvania: EnergyPark, Georgia: EnergyMountain

  6. Park and Power | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg,Energy LLC Jump to:3 of MasonPalcanOpenRuralParParityPark and

  7. Solar Parks of Extremadura | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS ReportEurope GmbH JumpSloughInfra Inc Jump to:Maid VenturaSolarParks

  8. Area Science Park | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminex A S JumpArchuleta County, Colorado:Ardentown,Area Science Park

  9. Agro Business Park | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAand DaltonSolar EnergyAerodynall CountriescapitalAgrimassBusiness Park

  10. Forbes Park Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdistoWhiskeyFootprint Ventures Jump to: navigation, searchForbes Park

  11. Overview | Savannah River National Environmental Park

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/O Streams forOrhan Kizilkaya, Ph.D.OurPark Overview The

  12. Parking Lot Update Construction on campus has led to changes in the designations of some parking lots. Many of the "E

    E-Print Network [OSTI]

    Capecchi, Mario R.

    Parking Lot Update Construction on campus has led to changes in the designations of some parking" permits to park during the summer semester, we will honor "E" permits in these lots until fall semester begins August 25th . If you have been parking in one of the lots that changed, here are a few

  13. To: UniPark, M411 A parking/car pooling permit payroll authority may be cancelled for the following reasons

    E-Print Network [OSTI]

    Tobar, Michael

    To: UniPark, M411 A parking/car pooling permit payroll authority may be cancelled for the following. the employee's circumstances have changed and a parking/car pooling permit is no longer required. Unless there are extenuating circumstances, an employee who has cancelled his/her parking/car pooling permit for reason 2. or 3

  14. ParkNet: Drive-by Sensing of Road-Side Parking Statistics Suhas Mathur, Tong Jin, Nikhil Kasturirangan, Janani Chandrashekharan,

    E-Print Network [OSTI]

    Gruteser, Marco

    and producing 730 tons of carbon dioxide. Clearly, addressing the problems associated with parking in downtownParkNet: Drive-by Sensing of Road-Side Parking Statistics Suhas Mathur, Tong Jin, Nikhil to achieve improved location accuracy. Based on 500 miles of road-side parking data collected over 2 months

  15. Smart Parking Linked to Transit: Lessons Learned from the San Francisco Bay Area Field Test

    E-Print Network [OSTI]

    Shaheen, Susan; Kemmerer, Charlene

    2007-01-01

    communications, and a wireless parking lot counting system)the highway to the smart parking lot and addressing residentcounting system in the BART parking lot to provide data for

  16. The Effects of Free Parking on Commuter Mode Choice: Evidence from Travel Diary Data

    E-Print Network [OSTI]

    Hess, Daniel Baldwin

    2001-01-01

    the costs and benefits of parking cash out, see Shoup (1994)J. Bianco. 1998. “Travel and Parking Behavior in the UnitedOut Employer-Paid Parking: A Precedent for Congestion

  17. Carsharing Parking Policy: A Review of North American Practices and San Francisco Bay Area Case Study

    E-Print Network [OSTI]

    Shaheen, Susan; Cohen, Adam P.; Martin, Elliot

    2010-01-01

    Salt Lake City. Free Metered Parking for “Green Vehicles. ”www.slcgov.com/Transportation/Parking/green.htm AccessedAccessed June 24, 2009. 27. Parking. San Francisco Bay Area

  18. Smart Parking Linked to Transit: Lessons Learned from the San Francisco Bay Area Field Test

    E-Print Network [OSTI]

    Shaheen, Susan; Kemmerer, Charlene

    2007-01-01

    2004, pp. 166-167. 9. Advanced Parking Management Systems: App. 41-42. 11. Arnott, S. Parking Tickets by Text, Smartcard14, 2007. 13. RingGo Parking System, First Great Western

  19. Analysis of seasonal and day-of-week traffic patterns at national parks 

    E-Print Network [OSTI]

    Liggett, Lindsay Elizabeth

    2009-05-15

    The National Park Service (NPS) is currently contemplating the implementation of a system-wide traffic monitoring program. While several of the national parks within this network collect continuous vehicle data at multiple stations within each park...

  20. Getting the Prices Right: An Evaluation of Pricing Parking by Demand in San Francisco

    E-Print Network [OSTI]

    Pierce, Gregory; Shoup, Donald

    2013-01-01

    built a new 1,500-space parking structure for $47 million (Boston’s plague of cheap parking. Boston Globe, February 7.the Insiders Guide to Parking in San Francisco. Sausalito:

  1. Evaluation and Design of Utility Co-Owned Cogeneration Systems for Industrial Parks 

    E-Print Network [OSTI]

    Hu, D. S.; Tamaro, R. F.; Schiller, S. R.

    1984-01-01

    , chosen by EPRI to support the industrial parks study. Cogeneration benefits for park owners, tenants and the local utilities are presented. A method developed for selecting industrial park sites for cogeneration facilities and design and financing options...

  2. Smart Parking Linked to Transit: Lessons Learned from the San Francisco Bay Area Field Test

    E-Print Network [OSTI]

    Shaheen, Susan; Kemmerer, Charlene

    2007-01-01

    C.J. Rodier, and A.M. Eaken. Smart Parking Management FieldT. Sugimoto, and T. Okuda. Smart Parking in Toyota’s Motown.S.A. Shaheen. Transit-Based Smart Parking: An Evaluation of

  3. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100Nationalquestionnaires 0serialIndustrial ConsumptionRibbon The|Rich land

  4. Land Management - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate studentScienceLaboratory program Labs and Field SiteLand

  5. Efficient Parking Allocation as Online Bipartite Matching with Posted Prices

    E-Print Network [OSTI]

    Chen, Yiling

    for example congestion tolls [19], smart grids [16], and electric vehicle charging [7, 17]. Parking allocation is one of our main results) is wrong. Please do not cite. 1. INTRODUCTION In recent years, smart parking systems are being deployed in an increasing number of cities. Such systems allow commuters and visitors

  6. SHORT COMMUNICATION Dynamical analysis of winter terrain park jumps

    E-Print Network [OSTI]

    of this work is to show how a dynamical analysis can assess impact injury risks and inform safer terrain park frequently pose a hazard to patrons and may represent a significant liability risk to winter resorts. By performing a simple dynamic analysis of terrain park jumps, the relative risk to impact injuries for any

  7. Crowdsensing Maps of On-Street Parking Spaces Vladimir Coric

    E-Print Network [OSTI]

    Gruteser, Marco

    each year, increases pollution, and has a negative impact on the overall quality of life in metropolitan areas. A significant part of congestion in urban areas is due to vehicles searching for on of mapping street parking spaces using vehicles' preinstalled parking sensors. In particular, we focus

  8. UNIVERSITY OF NORTH CAROLINA WILMINGTON Parking and Transportation Services

    E-Print Network [OSTI]

    Olszewski Jr., Edward A.

    UNIVERSITY OF NORTH CAROLINA WILMINGTON Parking and Transportation Services 601 South College Road, Wilmington, North Carolina 28403-5914 TEL. 910-962-3178 | FAX 910-962-3618 Lost Parking Permit Affidavit UNCW.00, forfeiture of permit privileges in accordance with University of North Carolina Wilmington Traffic

  9. Danehy Park Wind Turbine Project Preliminary Assessment Report

    E-Print Network [OSTI]

    Danehy Park Wind Turbine Project Preliminary Assessment Report Danehy Park Project Group Wind turbine. Katherine Dykes and Sungho Lee for their leadership, guidance, and feedback. #12;1 Introduction sensors were mounted is marked with a yellow star. #12;2 Turbine Evaluation Set This report evaluates

  10. Forest Management Helps Save Chadron State Park from Fire

    E-Print Network [OSTI]

    Farritor, Shane

    Forest Management Helps Save Chadron State Park from Fire OVER THE PAST HALF-CENTURY, wildfire has Creek Fire on its deadly rampage across the Pine Ridge. The good news is that due to active forest no infrastructure and its forest survived the fire intact. About 90 percent of the Park burned, with the majority

  11. MARQUAM HILL CAMPUS SW SWGIBBS ST / SAM JACKSON PARK RD

    E-Print Network [OSTI]

    Chapman, Michael S.

    B28 EMC MARQUAM HILL CAMPUS BRB SW SWGIBBS ST / SAM JACKSON PARK RD SW SAM JACKSON PARK RD SW US VETERANS HOSPITAL RD SW GAINES ST SW6THAVE SW CAMPUS DR SWUSVETERANSHOSPITALRD SW CAM PUS DR map: www.ohsu.edu/map From Lake Oswego/Sellwood Bridge area · Travel north on S.W. Macadam Ave. · Turn

  12. From land use to land cover: Restoring the afforestation signal...

    Office of Scientific and Technical Information (OSTI)

    integrated assessment - earth system model and the implications for CMIP5 RCP simulations Climate projections depend on scenarios of fossil fuel emissions and land use change, and...

  13. Center for Ecological Management of Military Lands 1 LCTA Relational Database

    E-Print Network [OSTI]

    Center for Ecological Management of Military Lands 1 LCTA Relational Database Center for Ecological Management of Military Lands No. 5 - 1997 The LCTA data is stored in a relational database, currently SQLBase from Gupta Technologies Inc. To the inexperienced user the LCTA database can seem very complex with 45

  14. University of Maryland, College ParkUniversity of Maryland, College ParkUniversity of Maryland, College Park June 9June 9June 9 ---13, 200813, 200813, 2008

    E-Print Network [OSTI]

    Maryland at College Park, University of

    Modeling CSCAMM, 4146 CSIC Bldg. #406, Paint Branch Drive University of Maryland, College Park MD 20742 E Foundation* Office of Naval Research Air Force Office of Scientific Research Center for Scientific

  15. Use of Occupancy Sensors in LED Parking Lot and Garage Applications...

    Office of Scientific and Technical Information (OSTI)

    Experiences Kinzey, Bruce R.; Myer, Michael; Royer, Michael P.; Sullivan, Greg P. LED lighting; parking lot lighting; occupancy sensors LED lighting; parking lot lighting;...

  16. Analysis of Land Suitable for Algae State of Hawaii

    E-Print Network [OSTI]

    Analysis of Land Suitable for Algae Production State of Hawaii Prepared for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Award No. DE-FC26-06NT42847 Hawai`i on Bioenergy Analyses By the Hawai`i Natural Energy Institute School of Ocean and Earth Science and Technology

  17. Climate Change Scenario Planning in Alaska's National Parks: Stakeholder Involvement in the Decision-Making Process

    SciTech Connect (OSTI)

    Ernst, Kathleen M; Van Riemsdijk, Dr. Micheline

    2013-01-01

    This article studies the participation of stakeholders in climate change decision-making in Alaska s National Parks. We place stakeholder participation within literatures on environmental and climate change decision-making. We conducted participant observation and interviews in two planning workshops to investigate the decision-making process, and our findings are three-fold. First, the inclusion of diverse stakeholders expanded climate change decision-making beyond National Park Service (NPS) institutional constraints. Second, workshops of the Climate Change Scenario Planning Project (CCSPP) enhanced institutional understandings of participants attitudes towards climate change and climate change decision-making. Third, the geographical context of climate change influences the decision-making process. As the first regional approach to climate change decision-making within the NPS, the CCSPP serves as a model for future climate change planning in public land agencies. This study shows how the participation of stakeholders can contribute to robust decisions, may move climate change decision-making beyond institutional barriers, and can provide information about attitudes towards climate change decision-making.

  18. Climate change scenario planning in Alaska's National Parks: Stakeholder involvement in the decision-making process

    SciTech Connect (OSTI)

    Ernst, Kathleen M; Van Riemsdijk, Dr. Micheline

    2013-01-01

    This article studies the participation of stakeholders in climate change decision-making in Alaska s National Parks. We place stakeholder participation within literatures on environmental and climate change decision-making. We conducted participant observation and interviews in two planning workshops to investigate the decision-making process, and our findings are three-fold. First, the inclusion of diverse stakeholders expanded climate change decision-making beyond National Park Service (NPS) institutional constraints. Second, workshops of the Climate Change Scenario Planning Project (CCSPP) enhanced institutional understandings of participants attitudes towards climate change and climate change decision-making. Third, the geographical context of climate change influences the decisionmaking process. As the first regional approach to climate change decision-making within the NPS, the CCSPP serves as a model for future climate change planning in public land agencies. This study shows how the participation of stakeholders can contribute to robust decisions, may move climate change decision-making beyond institutional barriers, and can provide information about attitudes towards climate change decision-making.

  19. NATIONAL ENVIRONMENTAL RESEARCH PARKS A National Environmental Research Park is an outdoor laboratory where research may be

    E-Print Network [OSTI]

    Georgia, University of

    by the National Environmental Policy Act (NEPA), the Energy Reorganization Act, the Department of EnergyCHARTER NATIONAL ENVIRONMENTAL RESEARCH PARKS A National Environmental Research Park is an outdoor laboratory where research may be carried out to achieve national environmental goals, as articulated

  20. PhonePark: Street parking using mobile phones* Leon Stenneth, Ouri Wolfson, Bo Xu, Philip S. Yu

    E-Print Network [OSTI]

    Wolfson, Ouri E.

    is important in urban areas, and if available could reduce congestion, pollution, and gas consumption, researchers found that vehicles searching for parking created an equivalence of 38 trips around world], installed in parking lots, or attached to side-doors of vehicles [2] are not needed in our approach

  1. Subscriber access provided by UNIV OF MARYLAND COLL PARK Journal of the American Chemical Society is published by the American Chemical

    E-Print Network [OSTI]

    Straub, John E.

    and Technology, UniVersity of Maryland, College Park, Maryland 20742, and RIKEN AdVanced Science Institute, 2 of A in solution have also been performed.3 In contrast, little is known about the TM structures of APP and APP-C99 of polypeptides via CR-H· · ·O hydrogen bonds between two segments in a membrane environment. A pairwise

  2. Land-Based Wind Potential Changes in the Southeastern United States (Presentation)

    SciTech Connect (OSTI)

    Roberts, J. O.

    2013-09-01

    Recent advancements in utility-scale wind turbine technology and pricing have vastly increased the potential land area where turbines can be deployed in the United States. This presentation quantifies the new developable land potential (e.g., capacity curves), visually identifies new areas for possible development (e.g., new wind resource maps), and begins to address deployment barriers to wind in new areas for modern and future turbine technology.

  3. Technology Assessment TECHNOLOGY ASSESSMENT

    E-Print Network [OSTI]

    Rock, Chris

    Technology Assessment 10/14/2004 1 TECHNOLOGY ASSESSMENT STRATEGIC PLAN MISSION STATEMENT Support the Mission of Texas Tech University and the TTU Information Technology Division by providing timely and relevant information and assistance in current and emerging technologies and their practical applications

  4. Bioscience Technology Bioscience Technology

    E-Print Network [OSTI]

    Vertes, Akos

    Bioscience Technology Bioscience Technology Advantage Business Media 100 Enterprise Drive Rockaway, co-director of George Washington University's Institute for Proteomics Technology and Applications-by-point. Manufacturers have stampeded to offer the new technology. Applied Biosystems got out in front in 2004 when

  5. Implementing Solar Technologies at Airports

    SciTech Connect (OSTI)

    Kandt, A.; Romero, R.

    2014-07-01

    Federal agencies, such as the Department of Defense and Department of Homeland Security, as well as numerous private entities are actively pursuing the installation of solar technologies to help reduce fossil fuel energy use and associated emissions, meet sustainability goals, and create more robust or reliable operations. One potential approach identified for siting solar technologies is the installation of solar energy technologies at airports and airfields, which present a significant opportunity for hosting solar technologies due to large amounts of open land. This report focuses largely on the Federal Aviation Administration's (FAA's) policies toward siting solar technologies at airports.

  6. Bachelor of Science & Bachelor of Science (Technology)

    E-Print Network [OSTI]

    Waikato, University of

    Bachelor of Science & Bachelor of Science (Technology) SpecialiSationS Environmental Microbiology environment. This specialisation can be attached to the Environmental Sciences major. Environmental Modelling Sciences major. Land and Freshwater Environments This specialisation is for students interested

  7. Strategic Plan for Coordinating Rural Intelligent Transportation System (ITS) Transit Development in the Great Smoky Mountains National Park

    SciTech Connect (OSTI)

    Truett, L.F.

    2002-12-19

    The Great Smoky Mountains National Park, located along the border between North Carolina and Tennessee, is the most visited national park in the United States. This rugged, mountainous area presents many transportation challenges. The immense popularity of the Smokies and the fact that the primary mode of transportation within the park is the personal vehicle have resulted in congestion, damage to the environment, impacts on safety, and a degraded visitor experience. Access to some of the Smokies historical, cultural, and recreational attractions via a mass transit system could alleviate many of the transportation issues. Although quite a few organizations are proponents of a mass transit system for the Smokies, there is a lack of coordination among all parties. In addition, many local residents are not completely comfortable with the idea of transit in the Smokies. This document provides a brief overview of the current transportation needs and limitations in the Great Smoky Mountains National Park, identifies agencies and groups with particular interests in the Smokies, and offers insights into the benefits of using Intelligent Transportation Systems (ITS) technologies in the Smokies. Recommendations for the use of rural ITS transit to solve two major transportation issues are presented.

  8. Energy Center at Discovery Park Historical Accomplishments

    E-Print Network [OSTI]

    Holland, Jeffrey

    departments. EC supports 10 research initiatives: Bioenergy; Clean Coal Technologies; Electrochemical; Global's office through the Indiana Center for Coal Technology Research. Through this effort and our Purdue. · Coal research activities have been energized in partnership with the State of Indiana's Lt. Governor

  9. facebook.com/UCRParkingServices 951-UCR-TAPSwww.parking.ucr.edu

    E-Print Network [OSTI]

    / LOT CLOSING: Transportation and Parking Services may temporarily close or modify any parking facilityfacebook.com/UCRParkingServices P30 P 26 Falkirk P20 9 @UCRTAPS 951-UCR-TAPSwww.parking.ucr.edu For your convenience we offer the following services: Battery Jump, Medical Transport. PARKING: 1. You must

  10. Agreement, Release, and Waiver for Use of Bicycle Parking Room Page 1 of 3

    E-Print Network [OSTI]

    Ottino, Julio M.

    Agreement, Release, and Waiver for Use of Bicycle Parking Room Page 1 of 3 Northwestern University, IL 60611 BICYCLE PARKING AGREEMENT AGREEMENT, RELEASE, AND WAIVER FOR USE OF BICYCLE PARKING ROOM defined herein), subject to space availability, for parking one bicycle during Licensee's work day, which

  11. Policies for parking pricing derived from a queueing perspective

    E-Print Network [OSTI]

    Sasanuma, Katsunobu

    2009-01-01

    Drivers in urban neighborhoods who cruise streets, seeking inexpensive on-street parking create a significant fraction of measured traffic congestion. The solution to this problem is to reduce the total traffic volume ...

  12. Maintenance-based design of concrete parking structures

    E-Print Network [OSTI]

    Stoakes, Christopher D. (Christopher David)

    2007-01-01

    The purpose of this study is to determine what type of preventative maintenance for a concrete parking structure will produce the maximum economic benefit. Existing models for concrete deterioration are analyzed for their ...

  13. Effectiveness of internet information for park, recreation and tourism practitioners 

    E-Print Network [OSTI]

    Patterson, Joni Denise

    2004-09-30

    This research is a four-step process. 1) Development of the Park, Recreation and Tourism (PRT) Planning Web site to meet the needs of rural communities, indicated through the Texas Community Futures Forum needs assessment ...

  14. Demonstration Assessment of Light-Emitting Diode (LED) Parking...

    Office of Scientific and Technical Information (OSTI)

    Search Title: Demonstration Assessment of Light-Emitting Diode (LED) Parking Lot Lighting at T.J.Maxx in Manchester, NH Phase I A report describing the process and results of...

  15. Photovoltaics and the National Park Service : an institutional analysis

    E-Print Network [OSTI]

    Nutt-Powell, Thomas E.

    1980-01-01

    This paper is one of a series resulting from institutional analysis of photovoltaic (PV) acceptance. The case reported here involves the acceptance of PV by the National Park Service. As part of the Department of the ...

  16. Hayashida, Masaaki; /Tokyo U., ICRR /KIPAC, Menlo Park; Stawarz...

    Office of Scientific and Technical Information (OSTI)

    GeV Emission tfrom the Circinus Galaxy with the Fermi-Lat Hayashida, Masaaki; Tokyo U., ICRR KIPAC, Menlo Park; Stawarz, Lukasz; JAXA, Tokyo Jagiellonian U., Astron. Observ.;...

  17. Who is Park Joo Young?, A Documentary Film

    E-Print Network [OSTI]

    Kopacz, Elizabeth Min-Sook

    2014-01-01

    Park Joo Young? , A Documentary Film A thesis submitted indocumentary narratives. I am drawn to firmly establishing the constructed nature of filmdocumentaries are visual by nature. Along a similar line, I was supposed to film

  18. UNIVERSITY PARK SCHOOLS SMALL TOWNS ON UPGRADES | Department...

    Energy Savers [EERE]

    Park, Maryland, a town of only 2,500 residents, sought to address the energy efficiency needs of its homeowners. To create a model for other resource-constrained small...

  19. St. Paul Parking Ramp Serves as a Model for Sustainability |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ramp in St. Paul, Minnesota by 50%. | Photo courtesy of City of St. Paul A 348-panel solar array at the RiverCentre parking ramp in St. Paul is expected to generate about...

  20. A visitation reporting system for Utah state parks 

    E-Print Network [OSTI]

    Burns, Dennis C.

    1988-01-01

    100 percent. Possible reasons for the large percent difference in some of the parks may be related to poor traffic counter placement or inordinately large numbers of non-recreation vehicles tripping the meter. ACKNOWLEDGEMENTS This professional... of the estimation model Excerpt from Forest Service Handbook Comparison of Parks: Percent of Recreating Vehicles vs percent Difference between PPV and "b" 73 75 80 84 VITA 87 LIST OF TABLES Table 1 Time periods sampled Page 12 2 Visitor use survey...

  1. Relation of park types and visitors' expenditure patterns: an analysis 

    E-Print Network [OSTI]

    Currie, Russell Roger

    1992-01-01

    this, communities adjacent to and those communities enroute to a historic sites/structures can attempt to justify their contribution to operating expenses for those parks. Understanding relationships between state funding expenses for Historic... Sites/Structures and the monies spent by visitors could provide the rationale for the relatively higher operating expenses compared to other state parks. The rationale being that visitor expenditures at Historic Sites/Structures are greater than...

  2. National Land Cover Data National Land Cover Data

    E-Print Network [OSTI]

    _Data_Presentation_Form: raster digital data Other_Citation_Details: Classification and processing of the orginal remote sensing (NLCD). The NLCD is a 21-class land cover classification of the entire United States. It is derived from

  3. Whose parking space is it? : managing residential parking in the context of urban growth : case study of Cambridge, MA

    E-Print Network [OSTI]

    Chang, Winnie C

    2014-01-01

    In the context of urban growth, how can a city approach residential parking issues? Cambridge, MA is experiencing rapid growth in real estate development and investment, shifts in demographics and travel behavior. How do ...

  4. Land and Facility Use Planning

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-07-09

    The Land and Facility Use Planning process provides a way to guide future site development and reuse based on the shared long-term goals and objectives of the Department, site and its stakeholders. Does not cancel other directives.

  5. PARKING/TRANSIT: Football game day information Will you be in Clemson during the game? If you have a car parked on

    E-Print Network [OSTI]

    Stuart, Steven J.

    a car parked on campus or plan to drive a car on campus or around town this weekend, read the following information and heed the warnings to avoid the expense and frustration of your car being towed from a spaceStadiumInfo2014.pdf?DB_OEM_ID=28500&DB_OEM_ID=28500 #12;Parking restrictions after the game Parked cars must

  6. Developing Clean Energy Projects on Tribal Lands: Data and Resources for Tribes (Book)

    SciTech Connect (OSTI)

    Not Available

    2012-12-01

    This is a outreach brochure (booklet) for the DOE Office of Indian Energy summarizing the renewable energy technology potential on tribal lands. The booklet features tech potential maps for various technologies, information about the activities of DOE-IE, and resources for Tribes.

  7. NASA Cold Land Processes Field Experiment

    E-Print Network [OSTI]

    NASA Cold Land Processes Field Experiment Overview and Preliminary Results NASA Cold Land Processes Field Experiment Overview and Preliminary Results NASA Cold Land ProcessesNASA Cold Land Processes Field properties using active and passive microwave remote sensing. NASA DC-8 Airborne Laboratory with AIRSAR

  8. 1 Copyright 2010 by ASME Proceedings of ASME Turbo Expo 2010: Power for Land, Sea and Air

    E-Print Network [OSTI]

    Thole, Karen A.

    resources in a clean manner is coal gasification. Integrated gasification combine cycle (IGCC) power plants utilize coal gasification technology to produce hydrogen and carbon monoxide based synthesis gas (syngas of Mechanical and Nuclear Engineering University Park, PA, USA ABSTRACT Demand for clean energy has increased

  9. Planning for Climate Change in Low-Impact Development Projects: A Case Study of the Sunset Swales Parking Lot Retrofit in San Francisco

    E-Print Network [OSTI]

    Conrad, Esther

    2011-01-01

    3. Swale in Sunset Swales Parking Lot, with ponding water.2007. “Sunset Swales Parking Lot Stormwater Retrofit Projectof the Sunset Swales Parking Lot Retrofit in San Francisco

  10. Planning for Climate Change in Low-Impact Development Projects: A Case Study of the Sunset Swales Parking Lot Retrofit in San Francisco

    E-Print Network [OSTI]

    Conrad, Esther

    2011-01-01

    3. Swale in Sunset Swales Parking Lot, with ponding water.L. , 2007. “Sunset Swales Parking Lot Stormwater Retrofitof the Sunset Swales Parking Lot Retrofit in San Francisco

  11. Revolution Now: The Future Arrives for Five Clean EnergyTechnologies...

    Broader source: Energy.gov (indexed) [DOE]

    four transformational technologies: land-based wind power, silicon photovoltaic (PV) solar modules, light-emitting diodes (LEDs), and electric vehicles (EVs). That study...

  12. Qualification and Demonstration Program for SSCL Lighting Systems In Park and Highway Applications

    SciTech Connect (OSTI)

    Don Osborne

    2005-06-30

    Meadow River Enterprises, Inc. (MRE) received a DOE cooperative agreement award in March of 2002 to develop Qualification and Demonstration Program for SSCL Lighting Systems in Parks and Highway Applications. (The SSCL lighting technology is the same technology that was developed under a DOE cooperative agreement DE-FC26-99FT40631.) This project spanned a period of 39 months and ended in June of 2005. Participates in the funding of this project included the US Department of Energy, Rahall Transportation Institute, West Virginia State Parks System, and Meadow River Enterprises, Inc. The total program costs totaled $850,000. The federal contribution to the program totaled $150,000 which represented 17.6% of the total costs. The SSCL is a rugged electroluminescent lamp and was designed for outdoor applications. However, since this is a new technology, there have never been any housing or solar packages assemble for its use in these outdoor applications. The purpose of this program was to develop several types of encasements and solar packages, then evaluate their performances over time. At the end of observations, a conclusion would be reached as to the methodology of encasement and solar package requirements. In addition this project was to evaluate the viability of this application for the SSCL product. In addition this project was to evaluate the feasibility of etching the top conductive layer of the SSCL panel to permit only the needed area to be illuminated; this would reduce the power requirements of a sign. All primary development objectives have been achieved.

  13. Web-GIS Based System for the Management of Objections to a Comprehensive Municipal Land Use Plan

    E-Print Network [OSTI]

    Touriño, Juan

    Web-GIS Based System for the Management of Objections to a Comprehensive Municipal Land Use Plan the land planning process. Geographic information Systems (GIS) have traditionally been used in daily municipalities in which the lack of resources or expert staff who can use this technology makes GIS

  14. Faience Technology

    E-Print Network [OSTI]

    Nicholson, Paul

    2009-01-01

    by Joanne Hodges. Faience Technology, Nicholson, UEE 2009Egyptian materials and technology, ed. Paul T. Nicholson,Nicholson, 2009, Faience Technology. UEE. Full Citation:

  15. Final Environmental Assessment for the Y-12 Steam Plant Life...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (ORNL), and East Tennessee Technology Park (ETTP). All of this land is titled to the United States of America and under the jurisdictional control of DOE for administration...

  16. EA-1640: Final Environmental Assessment and Finding of No Significant...

    Energy Savers [EERE]

    and Finding of No Significant Impact Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee DOE proposes to...

  17. Land-Use Requirements for Solar Power Plants in the United States

    SciTech Connect (OSTI)

    Ong, S.; Campbell, C.; Denholm, P.; Margolis, R.; Heath, G.

    2013-06-01

    This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As of the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.

  18. Transit-Based Smart Parking in the U.S.: Behavioral Analysis of San Francisco Bay Area Field Test

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan

    2006-01-01

    and A. Johnston. Real Time Parking Management dor TransitSmirti 13. Willson, R. Parking Pricing Without Tears: TripP. H. L. Bovy. A Dynamic Parking Reservation System for City

  19. Smart Parking Linked to Transit: Lessons Learned from the Field Test in San Francisco Bay Area of California

    E-Print Network [OSTI]

    Shaheen, Susan; Kemmerer, Charlene

    2008-01-01

    transit) and complements (i.e. parking services) for cars asCar commute cost (incl. parking) Non-car commute cost CarCar commute cost (incl. parking) Non-car commute cost Car

  20. Transit-Based Smart Parking in the San Francisco Bay Area: an Assessment of User Demand and Behavioral Effects

    E-Print Network [OSTI]

    Rodier, Caroline J.; Shaheen, Susan A.; Eaken, Amanda M.

    2004-01-01

    J.C. Kopp (2000). Real-time parking management systems formanagement: more than just parking. Traffic Technologyand Okuda, T. (1996). Smart parking in Toyota’s Motown. ITS: