  1. Cost and Performance Assumptions for Modeling Electricity Generation Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cost and Performance Assumptions for Modeling Electricity Generation Technologies Rick Tidball, Joel Bluestein, Nick Rodriguez, and Stu Knoke ICF International Fairfax, Virginia Subcontract Report NREL/SR-6A20-48595 November 2010 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 *

  2. Cost and Performance Assumptions for Modeling Electricity Generation Technologies

    SciTech Connect (OSTI)

    Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

    2010-11-01

    The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

  3. Subsea completion technology needs advances

    SciTech Connect (OSTI)

    Ledbetter, R.

    1995-09-18

    Subsea technology needs further advances to reduce operational costs before operators will expand the use of subsea well completions in the Gulf of Mexico. They will continue to choose surface completion-oriented systems as long as these are more economical operationally than subsea system. Designs of subsea equipment such as trees, connectors, control pods, umbilicals, and flow lines, must bring about reductions in the cost of both installation and workover compatibility. Remote operated vehicle (ROV) manipulation is one avenue that should be exploited. The bottom line is that significant cooperation between equipment manufacturers and ROV companies is needed to develop advanced ROV technology, and operators should be involved to help guide operational strategies.

  4. Stimulation Technologies for Deep Well Completions

    SciTech Connect (OSTI)

    Stephen Wolhart

    2005-06-30

    The Department of Energy (DOE) is sponsoring the Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies conducted a study to evaluate the stimulation of deep wells. The objective of the project was to review U.S. deep well drilling and stimulation activity, review rock mechanics and fracture growth in deep, high-pressure/temperature wells and evaluate stimulation technology in several key deep plays. This report documents results from this project.

  5. Snorre subsea completions advance TFL technology

    SciTech Connect (OSTI)

    Gunnarsson, B.; Tonnessen, S.H. )

    1992-12-01

    Well-service operations on subsea completions at Saga Petroleum's Snorre field performed by TFL (through-flowline) methods. These operations will be carried out by an innovative system that advances the state-of-the-art for TFL technology. The initial field development phase for Snorre includes 10 subsea wells mounted no a large template known as the Subsea Production System, or SPS. The 2 [times] 10 well slot arrangement on the SPS allows additional wells to be drilled as needed to replace the original ten. The template is located 6,500 m (21,320 ft) from the Snorre TLP and is connected to it by two 8-in. production lines, one 8-in. water injection line and two 3-in.-ID TFL service lines. The wells will be completed with dual 3 1/2-in. Tubing strings for TFL service operations. This article will overview the Snorre TFL system and discuss completion design.

  6. STIMULATION TECHNOLOGIES FOR DEEP WELL COMPLETIONS

    SciTech Connect (OSTI)

    Stephen Wolhart

    2003-06-01

    The Department of Energy (DOE) is sponsoring a Deep Trek Program targeted at improving the economics of drilling and completing deep gas wells. Under the DOE program, Pinnacle Technologies is conducting a project to evaluate the stimulation of deep wells. The objective of the project is to assess U.S. deep well drilling & stimulation activity, review rock mechanics & fracture growth in deep, high pressure/temperature wells and evaluate stimulation technology in several key deep plays. Phase 1 was recently completed and consisted of assessing deep gas well drilling activity (1995-2007) and an industry survey on deep gas well stimulation practices by region. Of the 29,000 oil, gas and dry holes drilled in 2002, about 300 were drilled in the deep well; 25% were dry, 50% were high temperature/high pressure completions and 25% were simply deep completions. South Texas has about 30% of these wells, Oklahoma 20%, Gulf of Mexico Shelf 15% and the Gulf Coast about 15%. The Rockies represent only 2% of deep drilling. Of the 60 operators who drill deep and HTHP wells, the top 20 drill almost 80% of the wells. Six operators drill half the U.S. deep wells. Deep drilling peaked at 425 wells in 1998 and fell to 250 in 1999. Drilling is expected to rise through 2004 after which drilling should cycle down as overall drilling declines.

  7. NREL: Technology Transfer - NREL, Collaborators Complete Gearbox...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to create an innovative drivetrain. The innovative, medium speed, medium-voltage wind turbine drivetrain design was developed with CREE, DNV KEMA, Romax Technology, and...

  8. Snorre subsea completions advance TFL technology

    SciTech Connect (OSTI)

    Gunnarsson, B.; Tennessen, S.H. )

    1993-01-01

    This paper reports on 1 of this two-part series overviewed downhole through-flowline (TFL) equipment used with an eccentric Y-block configuration to allow circulation through dual 3 1/2-in. Tubing strings. The subsea completions are in wells located on Saga Petroleum's Subsea Production System template, 6,500 m (21,320 ft) from the Snorre field TLP. This concluding presentation describes the systems control center based on the TLP, from which the remote TFL operations will be conducted. How the system was tested and commissioned before installation is discussed. And basic concepts of Saga's plans for a TFL-operated production logging system are illustrated.

  9. Geopressured geothermal drilling and completions technology development needs

    SciTech Connect (OSTI)

    Maish, A.B.

    1981-03-01

    Geopressured geothermal formations found in the Texas and Louisiana gulf coast region and elsewhere have the potential to supply large quantities of energy in the form of natural gas and warm brine (200 to 300/sup 0/F). Advances are needed, however, in hardware technology, well design technology, and drilling and completion practices to enable production and testing of exploratory wells and to enable economic production of the resource should further development be warranted. This report identifies needed technology for drilling and completing geopressured geothermal source and reinjection wells to reduce the cost and to accelerate commercial recovery of this resource. A comprehensive prioritized list of tasks to develop necessary technology has been prepared. Tasks listed in this report address a wide range of technology needs including new diagnostic techniques, control technologies, hardware, instrumentation, operational procedure guidelines and further research to define failure modes and control techniques. Tasks are organized into the functional areas of well design, drilling, casing installation, cementing, completions, logging, brine reinjection and workovers.

  10. Clean Coal Technology Programs: Completed Projects (Volume 2)

    SciTech Connect (OSTI)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  11. Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, October 1980-December 1980

    SciTech Connect (OSTI)

    Kelsey, J.R.

    1981-03-01

    The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development.

  12. Geothermal drilling ad completion technology development program. Semi-annual progress report, April-September 1979

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-05-01

    The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, and completion technology. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1982 and by 50% by 1986.

  13. Geothermal drilling and completion technology development program. Quarterly progress report, April-June 1980

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-07-01

    The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are reported. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

  14. Geothermal drilling and completion technology development program. Annual progress report, October 1979-September 1980

    SciTech Connect (OSTI)

    Varnado, S.G.

    1980-11-01

    The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

  15. Tahoe subsea completion -- A successful application of existing and new technologies

    SciTech Connect (OSTI)

    Clegg, W.K.; Orr, K.

    1995-12-31

    The Tahoe subsea satellite tieback (VK783) demonstrates how existing and new subsea technologies can be combined to achieve a cost effective yet technically significant subsea project. A used Green Canyon 29 subsea Xmas tree was refurbished and modified to implement more recent first-end layaway techniques for both the flowline and umbilical. The diverless completion was made in 1,500 ft. of water and tied back approximately 12 miles to a platform in 275 feet of water (Main Pass 252). The flowline system consisted of dual nominal 4-in. lines comprising both flexible and rigid pipes. The control system was multiplexed electrohydraulic with signal-on power umbilical transmission. Both downhole and Xmas tree temperature and pressure measurements were employed. The techniques used in the Tahoe subsea system can be applied to other projects to help improve cost, schedule, and reliability of subsea tiebacks.

  16. DOE/Fossil Energy`s drilling, completion, and stimulation RD&D: A technologies/products overview

    SciTech Connect (OSTI)

    Duda, J.R.; Yost, A.B. II

    1995-12-31

    An overview of natural gas drilling, completion, and stimulation RD&D sponsored by the US Department of Energy is reported in this paper. Development of high rate-of-penetration drilling systems and underbalanced drilling technologies are detailed among other RD&D activities. The overview serves as a technology transfer medium and is intended to accelerate the deployment of the products and technologies described.

  17. NiSource Energy Technologies Inc.: System Integration of Distributed Power for Complete Building Systems

    SciTech Connect (OSTI)

    Not Available

    2003-10-01

    Summarizes NiSource Energy Technologies' work under contract to DOE's Distribution and Interconnection R&D. Includes studying distributed generation interconnection issues and CHP system performance.

  18. Technolog

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research in Science and Technolog y Sandia pushes frontiers of knowledge to meet the nation's needs, today and tomorrow Sandia National Laboratories' fundamental science and technology research leads to greater understanding of how and why things work and is intrinsic to technological advances. Basic research that challenges scientific assumptions enables the nation to push scientific boundaries. Innovations and breakthroughs produced at Sandia allow it to tackle critical issues, from

  19. Development of a National Center for Hydrogen Technology. A Summary Report of Activities Completed at the National Center for Hydrogen Technology - Year 6

    SciTech Connect (OSTI)

    Holmes, Michael

    2012-08-01

    The Energy & Environmental Research Center (EERC) located in Grand Forks, North Dakota, has operated the National Center for Hydrogen Technology (NCHT) since 2005 under a Cooperative Agreement with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). The EERC has a long history of hydrogen generation and utilization from fossil fuels, and under the NCHT Program, the EERC has accelerated its research on hydrogen generation and utilization topics. Since the NCHT's inception, the EERC has received more than $65 million in funding for hydrogen-related projects ($24 million for projects in the NCHT, which includes federal and corporate partner development funds) involving more than 85 partners (27 with the NCHT). The NCHT Program's nine activities span a broad range of technologies that align well with the Advanced Fuels Program goals and, specifically, those described in the Hydrogen from Coal Program research, development, and demonstration (RD&D) plan that refers to realistic testing of technologies at adequate scale, process intensification, and contaminant control. A number of projects have been completed that range from technical feasibility of several hydrogen generation and utilization technologies to public and technical education and outreach tools. Projects under the NCHT have produced hydrogen from natural gas, coal, liquid hydrocarbons, and biomass. The hydrogen or syngas generated by these processes has also been purified in many of these instances or burned directly for power generation. Also, several activities are still undergoing research, development, demonstration, and commercialization at the NCHT. This report provides a summary overview of the projects completed in Year 6 of the NCHT. Individual activity reports are referenced as a source of detailed information on each activity.

  20. DEVELOPMENT OF A NATIONAL CENTER FOR HYDROGEN TECHNOLOGY: A SUMMARY REPORT OF ACTIVITIES COMPLETED AT THE NATIONAL CENTER FOR HYDROGEN TECHNOLOGY FROM 2005 TO 2010

    SciTech Connect (OSTI)

    Michael Holmes

    2011-05-31

    The Energy & Environmental Research Center (EERC) located in Grand Forks, North Dakota, has operated the National Center for Hydrogen Technology® (NCHT®) since 2005 under a Cooperative Agreement with the U.S. Department of Energy??s (DOE) National Energy Technology Laboratory (NETL). The EERC has a long history of hydrogen generation and utilization from fossil fuels, and under the NCHT Program, the EERC has accelerated its research of hydrogen generation and utilization topics. Since the NCHT??s inception, the EERC has received more than $65 million in funding of hydrogen-related projects ($20 million for the NCHT project which includes federal and corporate development partner funds) involving more than 85 partners (27 with the NCHT). The NCHT project??s 19 activities span a broad range of technologies that align well with the Advanced Fuels Program goals and, specifically, those described in the Hydrogen from Coal Program research, development, and demonstration (RD&D) plan. A number of projects have been completed which range from technical feasibility of several hydrogen generation and utilization technologies to public and technical education and outreach tools. Projects under the NCHT have produced hydrogen from natural gas, coal, liquid hydrocarbons, and biomass. The hydrogen or syngas generated by these processes has also been purified to transportation-grade quality in many of these instances or burned directly for power generation. Also, several activities are still undergoing research, development, demonstration, and commercialization at the NCHT. This report provides a summary overview of the projects completed in the first 5 years of the NCHT. Individual activity reports are referenced as a source of detailed information on each activity.

  1. Section 25: Future State Assumptions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Ranching None H55 Changes in agricultural practices - Fish farming None H56 Demographic change, urban developments, and technological developments None H58 Solution mining...

  2. Assumption Parish, Louisiana: Energy Resources | Open Energy...

    Open Energy Info (EERE)

    Zone Number 2 Climate Zone Subtype A. Places in Assumption Parish, Louisiana Belle Rose, Louisiana Labadieville, Louisiana Napoleonville, Louisiana Paincourtville, Louisiana...

  3. Assumptions to the Annual Energy Outlook 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    Office of Energy Analysis. September 2015 U.S. Energy Information Administration | Assumptions to ... gas, natural gas, kerosene, electricity, wood, geothermal, and solar energy. ...

  4. Assumptions to the Annual Energy Outlook 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    The electricity generation and water and space heating supplied by distributed ... September 2015 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook ...

  5. PROJECT MANGEMENT PLAN EXAMPLES Policy & Operational Decisions, Assumptions

    Office of Environmental Management (EM)

    Policy & Operational Decisions, Assumptions and Strategies Examples 1 & 2 Example 1 1.0 Summary The 322-M Metallurgical Laboratory is currently categorized as a Radiological Facility. It is inactive with no future DOE mission. In May of 1998 it was ranked Number 45 in the Inactive Facilities Risk Ranking database which the Facilities Decommissioning Division maintains. A short-term surveillance and maintenance program is in-place while the facility awaits final deactivation. Completion

  6. Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save Energy Now Assessment; Industrial Technologies Program (ITP) Save Energy Now Case Study (Brochure)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Goodyear operates more than 60 facilities in 26 countries, including the Union City, Tennessee, plant pictured above. Goodyear Tire Plant Gains Traction on Energy Savings After Completing Save Energy Now Assessment Saves $875,000 in Energy Costs; Reduces Natural Gas Consumption Industrial Technologies Program Case Study Benefits * Implemented approximately $875,000 in annual energy cost savings * Achieves annual natural gas savings of more than 93,000 MMBtu * Reduces No. 6 fuel oil consumption

  7. Assumptions to the Annual Energy Outlook 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    ... 0.000 -0.456 Mechanical Pulping-Electricity 0.794 1.006 -0.767 0.021 0.931 0.613 1.215 -1.380 0.893 September 2015 U.S. Energy Information Administration | Assumptions to the ...

  8. Assumptions to the Annual Energy Outlook 2015

    Gasoline and Diesel Fuel Update (EIA)

    International Energy Module The National Energy Modeling System International Energy Module (IEM) simulates the interaction between U.S. and global petroleum markets. It uses assumptions of economic growth and expectations of future U.S. and world crude-like liquids production and consumption to estimate the effects of changes in U.S. liquid fuels markets on the international petroleum market. For each year of the forecast, the IEM computes Brent and WTI prices, provides a supply curve of world

  9. Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    RSI

    2008-03-01

    The purpose of this Phased Construction Completion Report (PCCR) is to present the fiscal year (FY) 2007 results of characterization activities and recommended remedial actions (RAs) for 11 exposure units (EUs) in Zone 2 (Z2-01, Z2-03, Z2-08, Z2-23, Z2-24, Z2-28, Z2-34, Z2-37, Z2-41, Z2-43, and Z2-44) at the East Tennessee Technology Park (ETTP), which is located in the northwest corner of the U.S. Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee (Fig. 1). ETTP encompasses a total land area of approximately 5000 acres that has been subdivided into three zones--Zone 1 ({approx}1400 acres), Zone 2 ({approx}800 acres), and the Boundary Area ({approx}2800 acres). Zone 2, which encompasses the highly industrialized portion of ETTP shown in Fig. 1, consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Zone 2 Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the Dynamic Verification Strategy (DVS) and data quality objectives (DQOs) presented in the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for the accessible EUs in FY 2007; (2) Describe and document the risk evaluation for each EU, and determine if the EU met the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe the RAs performed in Zone 2. The Zone 2 ROD divided the Zone 2 area into 7 geographic areas and 44 EUs. To facilitate the DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was executed and completed in FY 2007 for the 11 EUs addressed in this document. The main body of this report describes both the DVS process and scope of work performed and the RAs completed. The scope and approach for performing DVS activities performed in FY 2007 that lead to action/no further action decisions are presented in Sects. 2 through 4. RAs performed in FY 2007 are presented in Sects. 5 through 10. Future land use is described in Sect. 11, and the status of all Zone 2 EUs as of this PCCR is presented in Sect. 12.

  10. Assumptions to the Annual Energy Outlook 2015

    U.S. Energy Information Administration (EIA) Indexed Site

    and technology input information for projections of new central-station U.S. electricity generating capacity using ... electricity generation, AEO2015 contains projections of ...

  11. Assumptions to the Annual Energy Outlook 2014

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    for many years as utilities make investments to replace aging or failing equipment. Smart grid technologies also have the potential to reduce peak demand through the...

  12. Manufacturing Energy and Carbon Footprint Definitions and Assumptions,

    Office of Environmental Management (EM)

    October 2012 | Department of Energy Definitions and Assumptions, October 2012 Manufacturing Energy and Carbon Footprint Definitions and Assumptions, October 2012 PDF icon footprints_assumptions_definitions_2012.pdf More Documents & Publications Understanding Manufacturing Energy and Carbon Footprints, October 2012 2010 Manufacturing Energy and Carbon Footprints: Definitions and Assumptions U.S. Manufacturing Energy Use and Greenhouse Gas Emissions Analysis

  13. Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2008-09-11

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-33 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a low probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-33. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18 acres addressed in this PCCR were assigned a low probability for consideration of release for unrestricted land use.

  14. Alternative Fuels Data Center: Vehicle Cost Calculator Assumptions and

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Methodology Assumptions and Methodology to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator Assumptions and Methodology on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator Assumptions and Methodology on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator Assumptions and Methodology on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator Assumptions and Methodology on Delicious Rank Alternative

  15. Alternative Fuels Data Center: Vehicle Cost Calculator Widget Assumptions

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    and Methodology Widget Assumptions and Methodology to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator Widget Assumptions and Methodology on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator Widget Assumptions and Methodology on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator Widget Assumptions and Methodology on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator Widget Assumptions and

  16. Phased Construction Completion Report for Building K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Garland S.

    2008-03-01

    This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

  17. Phased Construction Completion Report for Bldg. K-1401 of the Remaining Facilities Demolition Project at the East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2008-10-01

    This Phased Construction Completion Report documents the demolition of Bldg. K-1401, Maintenance Building, addressed in the Action Memorandum for the Remaining Facilities Demolition Project at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2003a) as a Comprehensive Environmental Response, Compensation, and Liability Act of 1980 non-time-critical removal action. The objectives of the removal action (DOE 2003a) - to eliminate the source of potential contamination, to eliminate the threat of potential future releases, and/or to eliminate the threats to the general public and the environment - were met. The end state of this action is for the slab to remain with all penetrations sealed and grouted or backfilled. The basement and pits remain open. There is residual radiological and polychlorinated biphenyl contamination on the slab and basement. A fixative was applied to the area on the pad contaminated with polychlorinated biphenyls. Interim land-use controls will be maintained until final remediation decisions are made under the Zone 2 Record of Decision (DOE 2005a).

  18. Completeness for sparse potential scattering

    SciTech Connect (OSTI)

    Shen, Zhongwei

    2014-01-15

    The present paper is devoted to the scattering theory of a class of continuum Schrdinger operators with deterministic sparse potentials. We first establish the limiting absorption principle for both modified free resolvents and modified perturbed resolvents. This actually is a weak form of the classical limiting absorption principle. We then prove the existence and completeness of local wave operators, which, in particular, imply the existence of wave operators. Under additional assumptions on the sparse potential, we prove the completeness of wave operators. In the context of continuum Schrdinger operators with sparse potentials, this paper gives the first proof of the completeness of wave operators.

  19. Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs

    2010-02-01

    The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

  20. Impact Conclusions are a Restatement of Assumptions with Literature...

    Office of Scientific and Technical Information (OSTI)

    Impact Conclusions are a Restatement of Assumptions with Literature Misinterpretations. Citation Details In-Document Search Title: Impact Conclusions are a Restatement of...

  1. Manufacturing Energy and Carbon Footprint Definitions and Assumptions...

    Broader source: Energy.gov (indexed) [DOE]

    Definitions and Assumptions A number of key terms are used to interpret the manufacturing energy and carbon footprints. The terms associated with the energy footprint analysis are ...

  2. Preliminary Review of Models, Assumptions, and Key Data used in Performance Assessments and Composite Analysis at the Idaho National Laboratory

    SciTech Connect (OSTI)

    Arthur S. Rood; Swen O. Magnuson

    2009-07-01

    This document is in response to a request by Ming Zhu, DOE-EM to provide a preliminary review of existing models and data used in completed or soon to be completed Performance Assessments and Composite Analyses (PA/CA) documents, to identify codes, methodologies, main assumptions, and key data sets used.

  3. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    SciTech Connect (OSTI)

    R. Sweeney

    2000-03-08

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.

  4. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    SciTech Connect (OSTI)

    R.E. Sweeney

    2001-02-08

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.

  5. Appendix C - Industrial technologies

    SciTech Connect (OSTI)

    None, None

    2002-12-20

    This report describes the results, calculations, and assumptions underlying the GPRA 2004 Quality Metrics results for all Planning Units within the Office of Industrial Technologies.

  6. Consumer Vehicle Technology Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    technologies Relevance: An informed understanding of the consumer allows VTO to achieve petroleum-use reduction goals through: * Robust assumptions for consumer modeling,...

  7. Consumer Vehicle Technology Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    technologies. Relevance: An informed understanding of the consumer allows VTO to achieve petroleum-use reduction goals through: * Robust assumptions for consumer modeling,...

  8. Assumption to the Annual Energy Outlook 2014 - International...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    3.2. The GDP growth rate assumptions for non-U.S. countriesregions are taken from Oxford Economic Model (October, 2012). The values for growth in total liquids demand in the...

  9. 2014 Manufacturing Energy and Carbon Footprints: Definitions and Assumptions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Definitions and Assumptions A number of key terms are used to interpret the manufacturing energy and carbon footprints. The terms associated with the energy footprint analysis are defined below in alphabetical order. Key definitions and assumptions associated with the greenhouse gas (GHG) footprint analysis are shown on pages 12 and 13. Energy Footprint Analysis Definitions CHP/Cogeneration - The production of electrical energy and another form of useful energy (such as heat or steam) through

  10. Impact Conclusions are a Restatement of Assumptions with Literature

    Office of Scientific and Technical Information (OSTI)

    Misinterpretations. (Journal Article) | SciTech Connect Journal Article: Impact Conclusions are a Restatement of Assumptions with Literature Misinterpretations. Citation Details In-Document Search Title: Impact Conclusions are a Restatement of Assumptions with Literature Misinterpretations. Abstract not provided. Authors: Boslough, Mark Bruce Elrick Publication Date: 2013-12-01 OSTI Identifier: 1121958 Report Number(s): SAND2013-10324J 491318 DOE Contract Number: DE-AC04-94AL85000 Resource

  11. completed_ep_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exploration Technologies | Reservoir Characterization | Advanced Drilling | Deep ... Water Production and Optimizing Drilling and Completion Practices Innovative ...

  12. FinalReport for completed IPP-0110 and 0110A Projects:"High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications"

    SciTech Connect (OSTI)

    Brown, Ian

    2009-09-01

    The DOE-supported IPP (Initiatives for Proliferation Prevention) Project, IPP-0110, and its accompanying 'add-on project' IPP-0110A, entitled 'High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications' was a collaborative project involving the Lawrence Berkeley National Laboratory (LBNL) as the U.S. DOE lab; the US surface modification company, Phygen, Inc., as the US private company involved; and the High Current Electronics Institute (HCEI) of the Russian Academy of Sciences, Tomsk, Siberia, Russia, as the NIS Institute involved. Regular scientific research progress meetings were held to which personnel came from all participating partners. The meetings were held mostly at the Phygen facilities in Minneapolis, Minnesota (with Phygen as host) with meetings also held at Tomsk, Russia (HCEI as host), and at Berkeley, California (LBNL as host) In this way, good exposure of all researchers to the various different laboratories involved was attained. This report contains the Final Reports (final deliverables) from the Russian Institute, HCEI. The first part is that for IPP-0110A (the 'main part' of the overall project) and the second part is that for the add-on project IPP-0110A. These reports are detailed, and contain all aspects of all the research carried out. The project was successful in that all deliverables as specified in the proposals were successfully developed, tested, and delivered to Phygen. All of the plasma hardware was designed, made and tested at HCEI, and the performance was excellent. Some of the machine and performance parameters were certainly of 'world class'. The goals and requirements of the IPP Project were well satisfied. I would like to express my gratitude to the DOE IPP program for support of this project throughout its entire duration, and for the unparalleled opportunity thereby provided for all of the diverse participants in the project to join in this collaborative research. The benefits are superb, as measured in quite a number of different ways.

  13. Deep Borehole Field Test Requirements and Controlled Assumptions.

    SciTech Connect (OSTI)

    Hardin, Ernest

    2015-07-01

    This document presents design requirements and controlled assumptions intended for use in the engineering development and testing of: 1) prototype packages for radioactive waste disposal in deep boreholes; 2) a waste package surface handling system; and 3) a subsurface system for emplacing and retrieving packages in deep boreholes. Engineering development and testing is being performed as part of the Deep Borehole Field Test (DBFT; SNL 2014a). This document presents parallel sets of requirements for a waste disposal system and for the DBFT, showing the close relationship. In addition to design, it will also inform planning for drilling, construction, and scientific characterization activities for the DBFT. The information presented here follows typical preparations for engineering design. It includes functional and operating requirements for handling and emplacement/retrieval equipment, waste package design and emplacement requirements, borehole construction requirements, sealing requirements, and performance criteria. Assumptions are included where they could impact engineering design. Design solutions are avoided in the requirements discussion. Deep Borehole Field Test Requirements and Controlled Assumptions July 21, 2015 iv ACKNOWLEDGEMENTS This set of requirements and assumptions has benefited greatly from reviews by Gordon Appel, Geoff Freeze, Kris Kuhlman, Bob MacKinnon, Steve Pye, David Sassani, Dave Sevougian, and Jiann Su.

  14. completed-ng-projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Completed Natural Gas and Unconventional Resources Projects DE-FE0001175 Targeted Technology Transfer for Oil and Natural Gas Petroleum Technology Transfer Council...

  15. The contour method cutting assumption: error minimization and correction

    SciTech Connect (OSTI)

    Prime, Michael B; Kastengren, Alan L

    2010-01-01

    The recently developed contour method can measure 2-D, cross-sectional residual-stress map. A part is cut in two using a precise and low-stress cutting technique such as electric discharge machining. The contours of the new surfaces created by the cut, which will not be flat if residual stresses are relaxed by the cutting, are then measured and used to calculate the original residual stresses. The precise nature of the assumption about the cut is presented theoretically and is evaluated experimentally. Simply assuming a flat cut is overly restrictive and misleading. The critical assumption is that the width of the cut, when measured in the original, undeformed configuration of the body is constant. Stresses at the cut tip during cutting cause the material to deform, which causes errors. The effect of such cutting errors on the measured stresses is presented. The important parameters are quantified. Experimental procedures for minimizing these errors are presented. An iterative finite element procedure to correct for the errors is also presented. The correction procedure is demonstrated on experimental data from a steel beam that was plastically bent to put in a known profile of residual stresses.

  16. Assumption to the Annual Energy Outlook 2014 - Commercial Demand...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    chosen to meet the projected service demands for the seven major end uses. Once technologies are chosen, the energy consumed by the equipment stock (both existing and purchased...

  17. Completed Sites Listing

    Broader source: Energy.gov [DOE]

    As of fiscal year 2012, EM (and its predecessor organization UMTRA) completed cleanup and closed 91 sites in 24 states.

  18. Experimental assessment of unvalidated assumptions in classical plasticity theory.

    SciTech Connect (OSTI)

    Brannon, Rebecca Moss; Burghardt, Jeffrey A.; Bauer, Stephen J.; Bronowski, David R.

    2009-01-01

    This report investigates the validity of several key assumptions in classical plasticity theory regarding material response to changes in the loading direction. Three metals, two rock types, and one ceramic were subjected to non-standard loading directions, and the resulting strain response increments were displayed in Gudehus diagrams to illustrate the approximation error of classical plasticity theories. A rigorous mathematical framework for fitting classical theories to the data, thus quantifying the error, is provided. Further data analysis techniques are presented that allow testing for the effect of changes in loading direction without having to use a new sample and for inferring the yield normal and flow directions without having to measure the yield surface. Though the data are inconclusive, there is indication that classical, incrementally linear, plasticity theory may be inadequate over a certain range of loading directions. This range of loading directions also coincides with loading directions that are known to produce a physically inadmissible instability for any nonassociative plasticity model.

  19. Halo-independent direct detection analyses without mass assumptions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Anderson, Adam J.; Fox, Patrick J.; Kahn, Yonatan; McCullough, Matthew

    2015-10-06

    Results from direct detection experiments are typically interpreted by employing an assumption about the dark matter velocity distribution, with results presented in the mχ – σn plane. Recently methods which are independent of the DM halo velocity distribution have been developed which present results in the vmin – g~ plane, but these in turn require an assumption on the dark matter mass. Here we present an extension of these halo-independent methods for dark matter direct detection which does not require a fiducial choice of the dark matter mass. With a change of variables from vmin to nuclear recoil momentum (pR),more » the full halo-independent content of an experimental result for any dark matter mass can be condensed into a single plot as a function of a new halo integral variable, which we call tilde h(pR). The entire family of conventional halo-independent tilde g~(vmin) plots for all DM masses are directly found from the single tilde h~(pR) plot through a simple rescaling of axes. By considering results in tildeh~(pR) space, one can determine if two experiments are inconsistent for all masses and all physically possible halos, or for what range of dark matter masses the results are inconsistent for all halos, without the necessity of multiple tilde g~(vmin) plots for different DM masses. As a result, we conduct a sample analysis comparing the CDMS II Si events to the null results from LUX, XENON10, and SuperCDMS using our method and discuss how the results can be strengthened by imposing the physically reasonable requirement of a finite halo escape velocity.« less

  20. Halo-independent direct detection analyses without mass assumptions

    SciTech Connect (OSTI)

    Anderson, Adam J.; Fox, Patrick J.; Kahn, Yonatan; McCullough, Matthew

    2015-10-06

    Results from direct detection experiments are typically interpreted by employing an assumption about the dark matter velocity distribution, with results presented in the m{sub χ}−σ{sub n} plane. Recently methods which are independent of the DM halo velocity distribution have been developed which present results in the v{sub min}−g-tilde plane, but these in turn require an assumption on the dark matter mass. Here we present an extension of these halo-independent methods for dark matter direct detection which does not require a fiducial choice of the dark matter mass. With a change of variables from v{sub min} to nuclear recoil momentum (p{sub R}), the full halo-independent content of an experimental result for any dark matter mass can be condensed into a single plot as a function of a new halo integral variable, which we call h-til-tilde(p{sub R}). The entire family of conventional halo-independent g-tilde(v{sub min}) plots for all DM masses are directly found from the single h-tilde(p{sub R}) plot through a simple rescaling of axes. By considering results in h-tilde(p{sub R}) space, one can determine if two experiments are inconsistent for all masses and all physically possible halos, or for what range of dark matter masses the results are inconsistent for all halos, without the necessity of multiple g-tilde(v{sub min}) plots for different DM masses. We conduct a sample analysis comparing the CDMS II Si events to the null results from LUX, XENON10, and SuperCDMS using our method and discuss how the results can be strengthened by imposing the physically reasonable requirement of a finite halo escape velocity.

  1. Halo-independent direct detection analyses without mass assumptions

    SciTech Connect (OSTI)

    Anderson, Adam J.; Fox, Patrick J.; Kahn, Yonatan; McCullough, Matthew

    2015-10-06

    Results from direct detection experiments are typically interpreted by employing an assumption about the dark matter velocity distribution, with results presented in the m? ?n plane. Recently methods which are independent of the DM halo velocity distribution have been developed which present results in the vmin g~ plane, but these in turn require an assumption on the dark matter mass. Here we present an extension of these halo-independent methods for dark matter direct detection which does not require a fiducial choice of the dark matter mass. With a change of variables from vmin to nuclear recoil momentum (pR), the full halo-independent content of an experimental result for any dark matter mass can be condensed into a single plot as a function of a new halo integral variable, which we call tilde h(pR). The entire family of conventional halo-independent tilde g~(vmin) plots for all DM masses are directly found from the single tilde h~(pR) plot through a simple rescaling of axes. By considering results in tildeh~(pR) space, one can determine if two experiments are inconsistent for all masses and all physically possible halos, or for what range of dark matter masses the results are inconsistent for all halos, without the necessity of multiple tilde g~(vmin) plots for different DM masses. As a result, we conduct a sample analysis comparing the CDMS II Si events to the null results from LUX, XENON10, and SuperCDMS using our method and discuss how the results can be strengthened by imposing the physically reasonable requirement of a finite halo escape velocity.

  2. Summary of Findings: Peer Review of the FY2000 GPRA Assumptions |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 0 GPRA Assumptions Summary of Findings: Peer Review of the FY2000 GPRA Assumptions Summary of Findings: Peer Review of the FY2000 GPRA Assumptions, Report to National Renewable Energy Laboratory, March 1999. PDF icon Summary of Findings More Documents & Publications Summary of Findings: Peer Review of the FY2001 GPRA Assumptions Summary of Findings: Peer Review of the FY2003 GPRA Assumptions ITP Steel: Steel Industry Marginal Opportunity Study September 2005

  3. Summary of Findings: Peer Review of the FY2001 GPRA Assumptions |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1 GPRA Assumptions Summary of Findings: Peer Review of the FY2001 GPRA Assumptions Summary of Findings: Peer Review of the FY2001 GPRA Assumptions, Report to National Renewable Energy Laboratory, February 29, 2000. PDF icon Summary of Findings More Documents & Publications Summary of Findings: Peer Review of the FY2003 GPRA Assumptions Summary of Findings: Peer Review of the FY2000 GPRA Assumptions Appendix K - GPRA06 Weatherization and Intergovernmental Program

  4. Summary of Findings: Peer Review of the FY2003 GPRA Assumptions |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3 GPRA Assumptions Summary of Findings: Peer Review of the FY2003 GPRA Assumptions Summary of Findings: Peer Review of the FY '03 GPRA Assumptions, Report to National Renewable Energy Laboratory, Washington, D.C., April 3, 2002. PDF icon Summary of Findings More Documents & Publications Summary of Findings: Peer Review of the FY2001 GPRA Assumptions Summary of Findings: Peer Review of the FY2000 GPRA Assumptions Opportunities for Micropower and Fuel Cell/Gas Turbine

  5. Assumption to the Annual Energy Outlook 2014 - Transportation...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    vehicle technology, hybrid vehicles will be sold to meet the AT-PZEV allowances, and hydrogen fuel cell vehicles will be sold to meet the pure ZEV requirements under the...

  6. Filter Replacement Activities Complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2014 Filter Replacement Activities Complete This week, filter replacements were safely and successfully completed. The high efficiency filters on the second filter unit were replaced on June 20, and employees replaced the moderate filters on June 23. Decontamination and cleanup of the work areas in the filter building will complete all activities currently scheduled for WIPP's ventilation system. Employees are also restoring higher airflow levels now that both filter units are operational.

  7. Successful horizontal completions require an integrated approach

    SciTech Connect (OSTI)

    Richard, B.; Smejkal, K.; Penberthy, W. Jr.

    1997-01-01

    While a perfect well completion may not exist, depleting a hydrocarbon resource at a sustained high rate--without a workover--is the ultimate goal. Unfortunately, many horizontal well completions fail to achieve this due to wellbore damage or loss of reservoir pressure. These conditions manifest themselves in reduced production rates, extended well life and reduced profitability. Standard completion techniques are not always compatible with each other for site specific well applications. The combination of two incompatible technologies or slight changes in a completion procedure may negatively impact productivity. Hence, the most successful horizontal completion results are obtained using a compatible integrated system approach--an approach that carefully combines the best completion tools and processes to deliver an undamaged well completed at the lowest possible cost. After studying the compatibilities of various drill-in fluids, screens, filter cakes and gravel packs, recommended procedures are presented for successfully completing horizontal wells.

  8. Assumptions and Expectations for Annual Energy Outlook 2015: Oil and Gas Working Group

    Gasoline and Diesel Fuel Update (EIA)

    Assumptions and Expectations for Annual Energy Outlook 2016: Oil and Gas Working Group AEO2016 Oil and Gas Supply Working Group Meeting Office of Petroleum, Gas, and Biofuels Analysis December 1, 2015| Washington, DC http://www.eia.gov/forecasts/aeo/workinggroup/ WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE We welcome feedback on our assumptions and documentation * The AEO Assumptions report http://www.eia.gov/forecasts/aeo/assumptions/

  9. Edison's move has completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    completed January 8, 2016 by Richard Gerber We're pleased to announce that Edison is once again available to all NERSC users. The move from the NERSC Oakland Scientific Facility...

  10. Science & Technology - 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    technology Science & Technology - 2015 October HAPLS Completes Phase 1 Energy-Ramping Campaign Shaping NIF's Beams for Direct-Drive Experiments September A Pioneering Betatron...

  11. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  12. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  13. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  14. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  15. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  16. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  17. Complete Safety Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Safety Training Print Facility Safety Training Required for ALL Users Users must register with the ALS to obtain an LBNL ID number before they can complete safety training courses. Once registered, choose the non-LDAP login and enter your LBNL ID number to begin. ALS 1001: Safety at the ALS EHS 0470: General Employee Radiation Training (GERT) Special Training Required for Some Users Laser Safety Users working with a Class 3B/4 laser EHS 0302 Macromolecular Crystallography Users

  18. Franklin Completed Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completed Jobs Franklin Completed Jobs Select a time period Show jobs that completed after Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 @ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 : 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

  19. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  20. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  1. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  2. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  3. Complete Experiment Safety Documentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Experiment Safety Documentation Print User Safety Overview Upon receiving beam time: 1. Log in to ALSHub to complete an Experiment Safety Sheet (ESS). The ALS This e-mail address is being protected from spambots. You need JavaScript enabled to view it is available to support you through this process. Please contact This e-mail address is being protected from spambots. You need JavaScript enabled to view it at the email link or at (510) 486-7222 at if you have questions or need more

  4. Subsea completions: Subsea continues strong

    SciTech Connect (OSTI)

    Mohr, H.O.

    1996-02-01

    Comparison of 1995 statistics to the previous three years indicates that the trend for applying subsea completions remains steady at about 80 installations per year. Consistent performance at this high level means industry maintains confidence in the technology. As recently as 1990, there was a low of 36 installations--the all-time high, prior to 1993, had been 66 during 1985. Another positive indicator is the number of identified future subsea completions, i.e., those in progress, or site-specific applications under consideration. This statistic also remains steady, with 1,340 at the end of 1995, and 1,341 and 1,315 at year-end 1994 and 1993. As a comparison, in 1989 and 1990, there were 1,083 and 976 identified. Petrobras is the leading user of subsea completions with 248, three times as many as Shell, the second most active operator. The ten tables of data shown list operating companies making the installations, where they are, what type, water depth, manufacturer and other descriptive features. Preceding discussions cover industry trends and development activity influencing the installations.

  5. Completion and workover fluid

    SciTech Connect (OSTI)

    Block, J.

    1985-09-17

    An aqueous completion or workover fluid for oil or gas wells having at least two solid components. One component is a hydroxy containing aluminum compound represented by the formula AlO(OH).xH/sub 2/O. The second component is a fluid loss control agent which can be either a cross-linked polyvinyl alcohol or a cross-linked hydroxyalkyl cellulose reaction product. An acid soluble weighting agent can be added for wells having higher down hole pressures. Examples of the weighting agents include iron carbonates, iron oxides, calcium carbonates, dolomite, sodium or calcium chloride, zinc bromide and calcium bromide. After use, the fluid can be displaced from the well with acid, e.g. 15% HCl, and the cake previously deposited on the bore-hole wall is dissolved by the acid so that no damaging residue remains.

  6. A new scenario framework for climate change research: The concept of Shared Climate Policy Assumptions

    SciTech Connect (OSTI)

    Kriegler, Elmar; Edmonds, James A.; Hallegatte, Stephane; Ebi, Kristie L.; Kram, Tom; Riahi, Keywan; Winkler, Harald; Van Vuuren, Detlef

    2014-04-01

    The paper presents the concept of shared climate policy assumptions as an important element of the new scenario framework. Shared climate policy assumptions capture key climate policy dimensions such as the type and scale of mitigation and adaptation measures. They are not specified in the socio-economic reference pathways, and therefore introduce an important third dimension to the scenario matrix architecture. Climate policy assumptions will have to be made in any climate policy scenario, and can have a significant impact on the scenario description. We conclude that a meaningful set of shared climate policy assumptions is useful for grouping individual climate policy analyses and facilitating their comparison. Shared climate policy assumptions should be designed to be policy relevant, and as a set to be broad enough to allow a comprehensive exploration of the climate change scenario space.

  7. Completed EISs | Department of Energy

    Office of Environmental Management (EM)

    Completed EISs Completed EISs Comprehensive EIS list PDF icon Completed EISs More Documents & Publications Environmental Impact Statements and Environmental Assessments Status Chart NEPA Documentation 2013 Annual Planning Summary for the Western Area Power Administration

  8. Ad Building demolition, recycling completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ad Building demolition, recycling completed Ad Building demolition, recycling completed Demolition of the Administration Building helps Los Alamos meet an NNSA directive to reduce...

  9. Specialized equipment enabled completions with large coiled tubing

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-02-19

    Specialized equipment enabled successful well completions in Oman with large 3{1/2}-inch coiled tubing. Conventional drilling or completion rigs were not needed. Although the use of 3{1/2}-inch coiled tubing to complete wells is relatively new, it is gaining widespread industry application. One Middle East operating company felt that if downhole completion equipment could be successfully run using coiled tubing, greater cost efficiency, both in initial deployment and in maintenance, could be derived. The paper lists some of the technical considerations for these assumptions. The long-term advantages regarding production and well maintenance cannot yet be determined, but experience in Oman has confirmed the belief that large coiled tubing completions can be technically achieved.

  10. Technical assumption for Mo-99 production in the MARIA reactor. Feasibility study

    SciTech Connect (OSTI)

    Jaroszewicz, J.; Pytel, K.; Dabkowski, L.; Krzysztoszek, G. [Institute of Atomic Energy, 05-400 Otwock-Swierk (Poland)

    2008-07-15

    The main objective of U-235 irradiation is to obtain the Tc-99m isotope which is widely used in the domain of medical diagnostics. The decisive factor determining its availability, despite its short life time, is a reaction of radioactive decay of Mo-99 into Tc- 99m. One of the possible sources of molybdenum can be achieved in course of the U-235 fission reaction. The paper presents activities and the calculations results obtained upon the feasibility study on irradiation of U-235 targets for production of molybdenum in the MARIA reactor. The activities including technical assumption were focused on performing calculation for modelling of the target and irradiation device as well as adequate equipment and tools for processing in reactor. It has been assumed that the basic component of fuel charge is an aluminium cladded plate with dimensions of 40x230x1.45 containing 4.7 g U-235. The presumed mode of the heat removal generated in the fuel charge of the reactor primary cooling circuit influences the construction of installation to be used for irradiation and the technological instrumentation. The outer channel construction for irradiation has to be identical as the standard fuel channel construction of the MARIA reactor. It enables to use the existing slab and reactor mounting sockets for the fastening of the molybdenum channel as well as the cooling water delivery system. The measurement of water temperature cooling a fuel charge and control of water flow rate in the channel can also be carried out be means of the standard instrumentation of the reactor. (author)

  11. Washington International Renewable Energy Conference (WIREC) 2008 Pledges. Methodology and Assumptions Summary

    SciTech Connect (OSTI)

    Babiuch, Bill; Bilello, Daniel E.; Cowlin, Shannon C.; Mann, Margaret; Wise, Alison

    2008-08-01

    This report describes the methodology and assumptions used by NREL in quantifying the potential CO2 reductions resulting from more than 140 governments, international organizations, and private-sector representatives pledging to advance the uptake of renewable energy.

  12. Behavioral Assumptions Underlying California Residential Sector Energy Efficiency Programs (2009 CIEE Report)

    Broader source: Energy.gov [DOE]

    This paper examines the behavioral assumptions that underlie California’s residential sector energy efficiency programs and recommends improvements that will help to advance the state’s ambitious greenhouse gas reduction goals.

  13. NGNP: High Temperature Gas-Cooled Reactor Key Definitions, Plant Capabilities, and Assumptions

    SciTech Connect (OSTI)

    Wayne Moe

    2013-05-01

    This document provides key definitions, plant capabilities, and inputs and assumptions related to the Next Generation Nuclear Plant to be used in ongoing efforts related to the licensing and deployment of a high temperature gas-cooled reactor. These definitions, capabilities, and assumptions were extracted from a number of NGNP Project sources such as licensing related white papers, previously issued requirement documents, and preapplication interactions with the Nuclear Regulatory Commission (NRC).

  14. JEA successfully completes world's largest CFB demonstration

    SciTech Connect (OSTI)

    2005-09-30

    JEA (formerly the Jacksonville Electric Authority) has successfully completed an eighth year landmark demonstration project that continues in baseload commercial operation. It scales up atmospheric fluidized-bed technology demonstration to the near-300-MW size, providing important data on a technology that can achieve > 90% SO{sub 2} removal and 60% NOx reduction at relatively high efficiencies and at costs comparable to those of conventional pulverized coal plants. The article recounts the history of the project. Performance tests showed a blend of coal and petcoke were most efficient as a feedstock. 3 figs.

  15. Completed Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completed Sites Completed Sites Completed Sites The Office of Environmental Management (EM) has been or is currently responsible for cleaning up sites across the United States. These sites were associated with the legacy of the nation's nuclear weapons program and other DOE research and development activities. Many of these sites have been cleaned up and transferred to other entities or to DOE's Legacy Management (LM) Program. Completed Sites Listing

  16. Sensitivity of Utility-Scale Solar Deployment Projections in the SunShot Vision Study to Market and Performance Assumptions

    SciTech Connect (OSTI)

    Eurek, K.; Denholm, P.; Margolis, R.; Mowers, M.

    2013-04-01

    The SunShot Vision Study explored the potential growth of solar markets if solar prices decreased by about 75% from 2010 to 2020. The ReEDS model was used to simulate utility PV and CSP deployment for this present study, based on several market and performance assumptions - electricity demand, natural gas prices, coal retirements, cost and performance of non-solar renewable technologies, PV resource variability, distributed PV deployment, and solar market supply growth - in addition to the SunShot solar price projections. This study finds that utility-scale solar deployment is highly sensitive to solar prices. Other factors can have significant impacts, particularly electricity demand and natural gas prices.

  17. Sensitivity of Rooftop PV Projections in the SunShot Vision Study to Market Assumptions

    SciTech Connect (OSTI)

    Drury, E.; Denholm, P.; Margolis, R.

    2013-01-01

    The SunShot Vision Study explored the potential growth of solar markets if solar prices decreased by about 75% from 2010 to 2020. The SolarDS model was used to simulate rooftop PV demand for this study, based on several PV market assumptions--future electricity rates, customer access to financing, and others--in addition to the SunShot PV price projections. This paper finds that modeled PV demand is highly sensitive to several non-price market assumptions, particularly PV financing parameters.

  18. FEMP Completes 2000th Renewable Energy Optimization Screening | Department

    Office of Environmental Management (EM)

    of Energy FEMP Completes 2000th Renewable Energy Optimization Screening FEMP Completes 2000th Renewable Energy Optimization Screening July 23, 2015 - 12:03pm Addthis REopt models the complex interactions of multiple thermal and electrical technologies, including photovoltaics, operating concurrently. (Photo Credit U.S. Marine Corps) REopt models the complex interactions of multiple thermal and electrical technologies, including photovoltaics, operating concurrently. (Photo Credit U.S. Marine

  19. Badge Office Completes CLEAR FORM PRINT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Badge Office Completes CLEAR FORM PRINT

  20. Pure-state informationally complete and 'really' complete measurements

    SciTech Connect (OSTI)

    Finkelstein, J.

    2004-11-01

    I construct a positive-operator-valued measure (POVM) which has 2d rank-1 elements and which is informationally complete for generic pure states in d dimensions, thus confirming a conjecture made by Flammia, Silberfarb, and Caves (e-print quant-ph/0404137). I show that if a rank-1 POVM is required to be informationally complete for all pure states in d dimensions, it must have at least 3d-2 elements. I also show that, in a POVM which is informationally complete for all pure states in d dimensions, for any vector there must be at least 2d-1 POVM elements which do not annihilate that vector.

  1. External review of the thermal energy storage (TES) cogeneration study assumptions. Final report

    SciTech Connect (OSTI)

    Lai, B.Y.; Poirier, R.N.

    1996-08-01

    This report is to provide a detailed review of the basic assumptions made in the design, sizing, performance, and economic models used in the thermal energy storage (TES)/cogeneration feasibility studies conducted by Pacific Northwest Laboratory (PNL) staff. This report is the deliverable required under the contract.

  2. Summary Of Findings Peer Review of the FY2001 GPRA Assumptions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Findings - Peer Review of the FY2001 GPRA Assumptions Report to National Renewable Energy Laboratory February 29, 2000 In response to TOA Number KDC-9-18631-00 Arthur D. Little, Inc. Acorn Park Cambridge, Massachusetts 02140-2390 Reference 69393-01 Table of Contents INTRODUCTION ..............................................................................................................................................2

  3. Summary of Findings … Peer Review of the FY2000 GPRA Assumptions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Findings - Peer Review of the FY2000 GPRA Assumptions Report to National Renewable Energy Laboratory March 1999 In response to TOA Number KDC-9-18631-00 Arthur D. Little, Inc. Acorn Park Cambridge, Massachusetts 02140-2390 Reference 39666 List of Tables ii Introduction................................................................................................................... 1

  4. Residential applliance data, assumptions and methodology for end-use forecasting with EPRI-REEPS 2.1

    SciTech Connect (OSTI)

    Hwang, R.J,; Johnson, F.X.; Brown, R.E.; Hanford, J.W.; Kommey, J.G.

    1994-05-01

    This report details the data, assumptions and methodology for end-use forecasting of appliance energy use in the US residential sector. Our analysis uses the modeling framework provided by the Appliance Model in the Residential End-Use Energy Planning System (REEPS), which was developed by the Electric Power Research Institute. In this modeling framework, appliances include essentially all residential end-uses other than space conditioning end-uses. We have defined a distinct appliance model for each end-use based on a common modeling framework provided in the REEPS software. This report details our development of the following appliance models: refrigerator, freezer, dryer, water heater, clothes washer, dishwasher, lighting, cooking and miscellaneous. Taken together, appliances account for approximately 70% of electricity consumption and 30% of natural gas consumption in the US residential sector. Appliances are thus important to those residential sector policies or programs aimed at improving the efficiency of electricity and natural gas consumption. This report is primarily methodological in nature, taking the reader through the entire process of developing the baseline for residential appliance end-uses. Analysis steps documented in this report include: gathering technology and market data for each appliance end-use and specific technologies within those end-uses, developing cost data for the various technologies, and specifying decision models to forecast future purchase decisions by households. Our implementation of the REEPS 2.1 modeling framework draws on the extensive technology, cost and market data assembled by LBL for the purpose of analyzing federal energy conservation standards. The resulting residential appliance forecasting model offers a flexible and accurate tool for analyzing the effect of policies at the national level.

  5. U.S. and Japan Complete Successful Field Trial of Methane Hydrate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Production Technologies | Department of Energy and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies U.S. and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies May 2, 2012 - 1:00pm Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today the completion of a successful, unprecedented test of technology in the North Slope of Alaska that was able to safely extract a steady flow of natural gas from methane hydrates -

  6. An evaluation of enhanced geothermal systems technology

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    A review of the assumptions and conclusions of the DOE-sponsored 2006 MIT study on "The Future of Geothermal Energy" and an evaluation of relevant technology from the commercial geothermal industry.

  7. Technology Solutions Case Study: Complete and Fully Aligned Air Barrier

    SciTech Connect (OSTI)

    none,

    2012-08-01

    This research project, conducted by Pacific Northwest National Laboratory, focused on eliminating excessive humidity in the attic of a multi-floor, single-family home that was causing condensation and water damage along the roof and eaves.

  8. Annual Technology Baseline

    Broader source: Energy.gov [DOE]

    The National Renewable Energy Laboratory is conducting a study sponsored by the U.S. Department of Energy DOE, Office of Energy Efficiency and Renewable Energy (EERE), that aims to document and implement an annual process designed to identify a realistic and timely set of input assumptions (e.g., technology cost and performance, fuel costs), and a diverse set of potential futures (standard scenarios), initially for electric sector analysis. This primary product of the Annual Technology Baseline (ATB) project component includes detailed cost and performance data (both current and projected) for both renewable and conventional technologies. This data is presented in MS Excel.

  9. Development of a tool dedicated to the evaluation of hydrogen term source for technological Wastes: assumptions, physical models, and validation

    SciTech Connect (OSTI)

    Lamouroux, C.

    2013-07-01

    In radioactive waste packages hydrogen is generated, in one hand, from the radiolysis of wastes (mainly organic materials) and, in the other hand, from the radiolysis of water content in the cement matrix. In order to assess hydrogen generation 2 tools based on operational models have been developed. One is dedicated to the determination of the hydrogen source term issues from the radiolysis of the wastes: the STORAGE tool (Simulation Tool Of Emission Radiolysis Gas), the other deals with the hydrogen source term gas, produced by radiolysis of the cement matrices (the Damar tool). The approach used by the STORAGE tool for assessing the production rate of radiolysis gases is divided into five steps: 1) Specification of the data packages, in particular, inventories and radiological materials defined for a package medium; 2) Determination of radiochemical yields for the different constituents and the laws of behavior associated, this determination of radiochemical yields is made from the PRELOG database in which radiochemical yields in different irradiation conditions have been compiled; 3) Definition of hypothesis concerning the composition and the distribution of contamination inside the package to allow assessment of the power absorbed by the constituents; 4) Sum-up of all the contributions; And finally, 5) validation calculations by comparison with a reduced sampling of packages. Comparisons with measured values confirm the conservative character of the methodology and give confidence in the safety margins for safety analysis report.

  10. Analysis of Modeling Assumptions used in Production Cost Models for Renewable Integration Studies

    SciTech Connect (OSTI)

    Stoll, Brady; Brinkman, Gregory; Townsend, Aaron; Bloom, Aaron

    2016-01-01

    Renewable energy integration studies have been published for many different regions exploring the question of how higher penetration of renewable energy will impact the electric grid. These studies each make assumptions about the systems they are analyzing; however the effect of many of these assumptions has not been yet been examined and published. In this paper we analyze the impact of modeling assumptions in renewable integration studies, including the optimization method used (linear or mixed-integer programming) and the temporal resolution of the dispatch stage (hourly or sub-hourly). We analyze each of these assumptions on a large and a small system and determine the impact of each assumption on key metrics including the total production cost, curtailment of renewables, CO2 emissions, and generator starts and ramps. Additionally, we identified the impact on these metrics if a four-hour ahead commitment step is included before the dispatch step and the impact of retiring generators to reduce the degree to which the system is overbuilt. We find that the largest effect of these assumptions is at the unit level on starts and ramps, particularly for the temporal resolution, and saw a smaller impact at the aggregate level on system costs and emissions. For each fossil fuel generator type we measured the average capacity started, average run-time per start, and average number of ramps. Linear programming results saw up to a 20% difference in number of starts and average run time of traditional generators, and up to a 4% difference in the number of ramps, when compared to mixed-integer programming. Utilizing hourly dispatch instead of sub-hourly dispatch saw no difference in coal or gas CC units for either start metric, while gas CT units had a 5% increase in the number of starts and 2% increase in the average on-time per start. The number of ramps decreased up to 44%. The smallest effect seen was on the CO2 emissions and total production cost, with a 0.8% and 0.9% reduction respectively when using linear programming compared to mixed-integer programming and 0.07% and 0.6% reduction, respectively, in the hourly dispatch compared to sub-hourly dispatch.

  11. NGNP: High Temperature Gas-Cooled Reactor Key Definitions, Plant Capabilities, and Assumptions

    SciTech Connect (OSTI)

    Phillip Mills

    2012-02-01

    This document is intended to provide a Next Generation Nuclear Plant (NGNP) Project tool in which to collect and identify key definitions, plant capabilities, and inputs and assumptions to be used in ongoing efforts related to the licensing and deployment of a high temperature gas-cooled reactor (HTGR). These definitions, capabilities, and assumptions are extracted from a number of sources, including NGNP Project documents such as licensing related white papers [References 1-11] and previously issued requirement documents [References 13-15]. Also included is information agreed upon by the NGNP Regulatory Affairs group's Licensing Working Group and Configuration Council. The NGNP Project approach to licensing an HTGR plant via a combined license (COL) is defined within the referenced white papers and reference [12], and is not duplicated here.

  12. Analysis of Modeling Assumptions used in Production Cost Models for Renewable Integration Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis of Modeling Assumptions used in Production Cost Models for Renewable Integration Studies Brady Stoll, Gregory Brinkman, Aaron Townsend, and Aaron Bloom National Renewable Energy Laboratory Technical Report NREL/TP-6A20-65383 January 2016 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the National Renewable Energy Laboratory

  13. Summary Of Findings Per Review of the FY '03 GPRA Assumptions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary of Findings Peer Review of the FY 03 GPRA Assumptions Report to National Renewable Energy Laboratory Washington, DC April 3, 2002 Arthur D. Little, Inc. Acorn Park Cambridge, Massachusetts 02140-2390 Reference 75395 Introduction The Government Performance and Results Act (GPRA) requires federal agencies to establish performance goals for their programs. Programs within the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) develop goals through a

  14. Microbes Disprove Long-Held Assumption that All Organisms Share a Common

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vocabulary | U.S. DOE Office of Science (SC) Microbes Disprove Long-Held Assumption that All Organisms Share a Common Vocabulary Biological and Environmental Research (BER) BER Home About Research Facilities Science Highlights Searchable Archive of BER Highlights External link Benefits of BER Funding Opportunities Biological & Environmental Research Advisory Committee (BERAC) Community Resources Contact Information Biological and Environmental Research U.S. Department of Energy

  15. Well completion and servicing fluid

    SciTech Connect (OSTI)

    Grimsley, R.L.

    1990-09-25

    This patent describes a well completion servicing fluid for controlling formation pressure during completion or servicing of a well. It comprises: an aqueous solution of calcium chloride, a solid weighing agent suspended in the solution and being selected from the group consisting of zinc, zinc oxide, and mixtures thereof; and a viscosifier dissolved in the solution in an amount effective to suspend the weighing agent. The fluid has a density of greater than 15 pounds per gallon and being substantially free of bromide ions and being substantially free of solid material which is not soluble in hydrochloric acid.

  16. Completed NSTX-U. After

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    panel (15 tons) being inserted into the new neutral beam box. New neutral beam box (40 tons) being moved into the NSTX-U test cell. Center stack encased within the vacuum boundary and lowered into the NSTX-U. Completed center stack installed in the NSTX-U. Completed NSTX-U. After Original NSTX prior to the upgrade. Before Building the first quadrant of the center stack magnet. Winding the ohmic heating coil around the center stack. National Spherical Torus Experiment - Upgrade NSTX was a

  17. Administration Building demolition completed under budget

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Building demolition completed under budget Administration Building demolition completed under budget Project activities started in April 2009 and was completed five...

  18. GPRA 2003 quality metrics methodology and results: Office of Industrial Technologies

    SciTech Connect (OSTI)

    None, None

    2002-04-19

    This report describes the results, calculations, and assumptions underlying the GPRA 2003 Quality Metrics results for all Planning Units withing the Office of Industrial Technologies.

  19. The following data/assumptions will better address the LLW differences between t

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    data/assumptions will better address the LLW differences between the LEU option and the LEU/Th option of Alternative 1. 1. There is 397 kg fissile ( 233 U and 235 U) in the HTGR fuel. 2. Based on past experience of LLW to Nevada National Security Site, it is expected that the maximum quantity of fissile in a Type B shipping container (CASTOR cask) will be restricted to 1 kg. To protect a 1 kg maximum, it is assumed that 900 grams would be the maximum in a CASTOR cask. Therefore, from a fissile

  20. Bases, Assumptions, and Results of the Flowsheet Calculations for the Decision Phase Salt Disposition Alternatives

    SciTech Connect (OSTI)

    Dimenna, R.A.; Jacobs, R.A.; Taylor, G.A.; Durate, O.E.; Paul, P.K.; Elder, H.H.; Pike, J.A.; Fowler, J.R.; Rutland, P.L.; Gregory, M.V.; Smith III, F.G.; Hang, T.; Subosits, S.G.; Campbell, S.G.

    2001-03-26

    The High Level Waste (HLW) Salt Disposition Systems Engineering Team was formed on March 13, 1998, and chartered to identify options, evaluate alternatives, and recommend a selected alternative(s) for processing HLW salt to a permitted wasteform. This requirement arises because the existing In-Tank Precipitation process at the Savannah River Site, as currently configured, cannot simultaneously meet the HLW production and Authorization Basis safety requirements. This engineering study was performed in four phases. This document provides the technical bases, assumptions, and results of this engineering study.

  1. China National Machinery Industry Complete Engineering Corporation...

    Open Energy Info (EERE)

    Industry Complete Engineering Corporation CMCEC Jump to: navigation, search Name: China National Machinery Industry Complete Engineering Corporation (CMCEC) Place: Beijing,...

  2. Complete EOS for PBX 9502

    SciTech Connect (OSTI)

    Menikoff, Ralph S

    2009-10-08

    PBX 9502 is an insensitive plastic-bonded explosive based on triamino-trinitrobenzene (TATB). A complete equation of state (EOS) is constructed for unreacted PBX 9502 suitable for reactive burn models, i.e., high pressure regime in which material strength is unimportant. The PBX EOS is composed of two parts: a complete EOS for TATB and a porosity model which allows for variations in the initial PBX density. The TATB EOS is based on a cold curve and a thermal model for lattice vibrations. The heat capacity, and hence thermal model, is determined by the vibrational spectrum from Raman scattering. The cold curve is calibrated to diamond anvil cell data for isothermal compression using a two-piece Keane fitting form. Hugoniot data for PBX 9502 is used as a consistency check.

  3. EM Performs Tenth Technology Readiness Assessment

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006.

  4. Complete liquefaction methods and apparatus

    DOE Patents [OSTI]

    Turner, Terry D.; Wilding, Bruce M.

    2013-10-15

    A method and apparatus are described to provide complete gas utilization in the liquefaction operation from a source of gas without return of natural gas to the source thereof from the process and apparatus. The mass flow rate of gas input into the system and apparatus may be substantially equal to the mass flow rate of liquefied product output from the system, such as for storage or use.

  5. DOE's New Large Blade Test Facility in Massachusetts Completes First

    Office of Environmental Management (EM)

    Commercial Blade Tests | Department of Energy DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests December 19, 2011 - 3:15pm Addthis This is an excerpt from the Fourth Quarter 2011 edition of the Wind Program R&D Newsletter. Since opening its doors for business in May, the Wind Technology Testing Center (WTTC), in Boston, Massachusetts, has come up to full

  6. A Comparative Study on Emerging Electric Vehicle Technology Assessments

    SciTech Connect (OSTI)

    Ford, Jonathan; Khowailed, Gannate; Blackburn, Julia; Sikes, Karen

    2011-03-01

    Numerous organizations have published reports in recent years that investigate the ever changing world of electric vehicle (EV) technologies and their potential effects on society. Specifically, projections have been made on greenhouse gas (GHG) emissions associated with these vehicles and how they compare to conventional vehicles or hybrid electric vehicles (HEVs). Similar projections have been made on the volumes of oil that these vehicles can displace by consuming large amounts of grid electricity instead of petroleum-based fuels. Finally, the projected rate that these new vehicle fleets will enter the market varies significantly among organizations. New ideas, technologies, and possibilities are introduced often, and projected values are likely to be refined as industry announcements continue to be made. As a result, over time, a multitude of projections for GHG emissions, oil displacement, and market penetration associated with various EV technologies has resulted in a wide range of possible future outcomes. This leaves the reader with two key questions: (1) Why does such a collective range in projected values exist in these reports? (2) What assumptions have the greatest impact on the outcomes presented in these reports? Since it is impractical for an average reader to review and interpret all the various vehicle technology reports published to date, Sentech Inc. and the Oak Ridge National Laboratory have conducted a comparative study to make these interpretations. The primary objective of this comparative study is to present a snapshot of all major projections made on GHG emissions, oil displacement, or market penetration rates of EV technologies. From the extensive data found in relevant publications, the key assumptions that drive each report's analysis are identified and 'apples-to-apples' comparisons between all major report conclusions are attempted. The general approach that was taken in this comparative study is comprised of six primary steps: (1) Search Relevant Literature - An extensive search of recent analyses that address the environmental impacts, market penetration rates, and oil displacement potential of various EV technologies was conducted; (2) Consolidate Studies - Upon completion of the literature search, a list of analyses that have sufficient data for comparison and that should be included in the study was compiled; (3) Identify Key Assumptions - Disparity in conclusions very likely originates from disparity in simple assumptions. In order to compare 'apples-to-apples,' key assumptions were identified in each study to provide the basis for comparing analyses; (4) Extract Information - Each selected report was reviewed, and information on key assumptions and data points was extracted; (5) Overlay Data Points - Visual representations of the comprehensive conclusions were prepared to identify general trends and outliers; and (6) Draw Final Conclusions - Once all comparisons are made to the greatest possible extent, the final conclusions were draw on what major factors lead to the variation in results among studies.

  7. Assumption to the Annual Energy Outlook 2014 - Oil and Gas Supply...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    explicitly modeled to determine the direct impacts on supply, reserves, and various economic parameters. The success of the technology program is measured by estimating the...

  8. Development of Enhanced Geothermal Systems Technologies Workshops |

    Office of Environmental Management (EM)

    Department of Energy Development of Enhanced Geothermal Systems Technologies Workshops Development of Enhanced Geothermal Systems Technologies Workshops The following documents are from a series of four workshops held in 2007 that were intended to motivate facilitated discussion on technology gaps related to reservoir management and operations. The first presentation evaluated the assumptions set forth in the report by the Massachusetts Institute of Technology (MIT) titled The Future of

  9. Slant hole completion test. Final report

    SciTech Connect (OSTI)

    Mann, R.L.

    1993-07-01

    One of the Department of Energy`s (DOE) Strategies and Objectives in the Natural Gas Program is to conduct activities to transfer technology from R&D programs to potential users. The Slant Hole Completion Test has achieved exactly this objective. The Slant Hole site is essentially the same as the Multiwell site and is located in the southeastern portion of the Piceance Basin near Rifle, Colorado. The Piceance Basin is typical of the Western low permeability basins that contain thick sequences of sands, silts and coals deposited during the Cretaceous period. These sequences contain vast amounts of natural gas but have proven to be resistant to commercial production because of the low permeability of the host rocks. Using the knowledge gained from the DOE`s earlier Multiwell experiment, the SHCT-1 was drilled to demonstrate that by intersecting the natural fractures found in these ``tight rocks,`` commercial gas production can be obtained.

  10. Completed Projects Table.xlsx

    Office of Environmental Management (EM)

    Completed Projects 2005-Present Approved Actual Soil and Water Remediation Soil and Water Remediation ANLE-0030 a 28 $ 30 $ 2007 2007 Yes Yes Yes Nuclear Facility Deactivation and Decommissioning ANLE-0040 18 $ 14 $ 2009 2010 Yes Yes Yes Nuclear Facility Decontamination and Decommissioning Building 310 ANLE-0040.NEW.R1.1 13 $ 8 $ 2011 2011 Yes Yes Yes Nuclear Facility D & D Building 330 ANLE-0040.NEW.R1.2 34 $ 15 $ 2011 2011 Yes Yes Yes Ashtabula, OH Soil and Water Remediation Soil and Water

  11. Washington International Renewable Energy Conference 2008 Pledges: Methodology and Assumptions Summary

    SciTech Connect (OSTI)

    Babiuch, B.; Bilello, D. E.; Cowlin, S. C.; Mann, M.; Wise, A.

    2008-08-01

    The 2008 Washington International Renewable Energy Conference (WIREC) was held in Washington, D.C., from March 4-6, 2008, and involved nearly 9,000 people from 125 countries. The event brought together worldwide leaders in renewable energy (RE) from governments, international organizations, nongovernmental organizations, and the private sector to discuss the role that renewables can play in alleviating poverty, growing economies, and passing on a healthy planet to future generations. The conference concluded with more than 140 governments, international organizations, and private-sector representatives pledging to advance the uptake of renewable energy. The U.S. government authorized the National Renewable Energy Laboratory (NREL) to estimate the carbon dioxide (CO2) savings that would result from the pledges made at the 2008 conference. This report describes the methodology and assumptions used by NREL in quantifying the potential CO2 reductions derived from those pledges.

  12. CRITICAL ASSUMPTIONS IN THE F-TANK FARM CLOSURE OPERATIONAL DOCUMENTATION REGARDING WASTE TANK INTERNAL CONFIGURATIONS

    SciTech Connect (OSTI)

    Hommel, S.; Fountain, D.

    2012-03-28

    The intent of this document is to provide clarification of critical assumptions regarding the internal configurations of liquid waste tanks at operational closure, with respect to F-Tank Farm (FTF) closure documentation. For the purposes of this document, FTF closure documentation includes: (1) Performance Assessment for the F-Tank Farm at the Savannah River Site (hereafter referred to as the FTF PA) (SRS-REG-2007-00002), (2) Basis for Section 3116 Determination for Closure of F-Tank Farm at the Savannah River Site (DOE/SRS-WD-2012-001), (3) Tier 1 Closure Plan for the F-Area Waste Tank Systems at the Savannah River Site (SRR-CWDA-2010-00147), (4) F-Tank Farm Tanks 18 and 19 DOE Manual 435.1-1 Tier 2 Closure Plan Savannah River Site (SRR-CWDA-2011-00015), (5) Industrial Wastewater Closure Module for the Liquid Waste Tanks 18 and 19 (SRRCWDA-2010-00003), and (6) Tank 18/Tank 19 Special Analysis for the Performance Assessment for the F-Tank Farm at the Savannah River Site (hereafter referred to as the Tank 18/Tank 19 Special Analysis) (SRR-CWDA-2010-00124). Note that the first three FTF closure documents listed apply to the entire FTF, whereas the last three FTF closure documents listed are specific to Tanks 18 and 19. These two waste tanks are expected to be the first two tanks to be grouted and operationally closed under the current suite of FTF closure documents and many of the assumptions and approaches that apply to these two tanks are also applicable to the other FTF waste tanks and operational closure processes.

  13. Technical considerations related to interim source-term assumptions for emergency planning and equipment qualification. [PWR; BWR

    SciTech Connect (OSTI)

    Niemczyk, S.J.; McDowell-Boyer, L.M.

    1982-09-01

    The source terms recommended in the current regulatory guidance for many considerations of light water reactor (LWR) accidents were developed a number of years ago when understandings of many of the phenomena pertinent to source term estimation were relatively primitive. The purpose of the work presented here was to develop more realistic source term assumptions which could be used for interim regulatory purposes for two specific considerations, namely, equipment qualification and emergency planning. The overall approach taken was to adopt assumptions and models previously proposed for various aspects of source term estimation and to modify those assumptions and models to reflect recently gained insights into, and data describing, the release and transport of radionuclides during and after LWR accidents. To obtain illustrative estimates of the magnitudes of the source terms, the results of previous calculations employing the adopted assumptions and models were utilized and were modified to account for the effects of the recent insights and data.

  14. Geothermal innovative technologies catalog

    SciTech Connect (OSTI)

    Kenkeremath, D.

    1988-09-01

    The technology items in this report were selected on the basis of technological readiness and applicability to current technology transfer thrusts. The items include technologies that are considered to be within 2 to 3 years of being transferred. While the catalog does not profess to be entirely complete, it does represent an initial attempt at archiving innovative geothermal technologies with ample room for additions as they occur. The catalog itself is divided into five major functional areas: Exploration; Drilling, Well Completion, and Reservoir Production; Materials and Brine Chemistry; Direct Use; and Economics. Within these major divisions are sub-categories identifying specific types of technological advances: Hardware; Software; Data Base; Process/Procedure; Test Facility; and Handbook.

  15. Estimating Alarm Thresholds for Process Monitoring Data under Different Assumptions about the Data Generating Mechanism

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Burr, Tom; Hamada, Michael S.; Howell, John; Skurikhin, Misha; Ticknor, Larry; Weaver, Brian

    2013-01-01

    Process monitoring (PM) for nuclear safeguards sometimes requires estimation of thresholds corresponding to small false alarm rates. Threshold estimation dates to the 1920s with the Shewhart control chart; however, because possible new roles for PM are being evaluated in nuclear safeguards, it is timely to consider modern model selection options in the context of threshold estimation. One of the possible new PM roles involves PM residuals, where a residual is defined as residual = data − prediction. This paper reviews alarm threshold estimation, introduces model selection options, and considers a range of assumptions regarding the data-generating mechanism for PM residuals.more » Two PM examples from nuclear safeguards are included to motivate the need for alarm threshold estimation. The first example involves mixtures of probability distributions that arise in solution monitoring, which is a common type of PM. The second example involves periodic partial cleanout of in-process inventory, leading to challenging structure in the time series of PM residuals.« less

  16. NREL: Technology Transfer - Agreements for Commercializing Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreements for Commercializing Technology NREL uses Agreements for Commercializing Technology (ACT) when a partner seeks highly specialized or technical services to complete a project. An ACT agreement also authorizes participating contractor-operated DOE laboratories, such as NREL, to partner with businesses using more flexible terms that are aligned with industry practice. Read more about how this partnership tool increases flexibility. The agreement type used depends on the business, and the

  17. Complete Streets Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete Streets Resources Complete Streets Resources While transportation efficiency policies are often implemented under local governments, national and state programs can play supportive roles in reducing vehicle miles traveled. Find complete streets resources below. National Complete Streets Coalition. Back to Transportation

  18. Deactivation Completion and Turnover | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completion and Turnover Deactivation Completion and Turnover Achieving consensus that deactivation is complete can involve several parties including the deactivation contractor, the Field Office, DOE Headquarters, the post-deactivation contractor, regulators, and stakeholders. PDF icon Deactivation Completion and Turnover More Documents & Publications Post-Deactivation Surveillance and Maintenance Planning Deactivation Management End Points Specification Methods

  19. Is the assumption of normality or log-normality for continuous response data critical for benchmark dose estimation?

    SciTech Connect (OSTI)

    Shao, Kan; Gift, Jeffrey S.; Setzer, R. Woodrow

    2013-11-01

    Continuous responses (e.g. body weight) are widely used in risk assessment for determining the benchmark dose (BMD) which is used to derive a U.S. EPA reference dose. One critical question that is not often addressed in doseresponse assessments is whether to model the continuous data as normally or log-normally distributed. Additionally, if lognormality is assumed, and only summarized response data (i.e., mean standard deviation) are available as is usual in the peer-reviewed literature, the BMD can only be approximated. In this study, using the hybrid method and relative deviation approach, we first evaluate six representative continuous doseresponse datasets reporting individual animal responses to investigate the impact on BMD/BMDL estimates of (1) the distribution assumption and (2) the use of summarized versus individual animal data when a log-normal distribution is assumed. We also conduct simulation studies evaluating model fits to various known distributions to investigate whether the distribution assumption has influence on BMD/BMDL estimates. Our results indicate that BMDs estimated using the hybrid method are more sensitive to the distribution assumption than counterpart BMDs estimated using the relative deviation approach. The choice of distribution assumption has limited impact on the BMD/BMDL estimates when the within dose-group variance is small, while the lognormality assumption is a better choice for relative deviation method when data are more skewed because of its appropriateness in describing the relationship between mean and standard deviation. Additionally, the results suggest that the use of summarized data versus individual response data to characterize log-normal distributions has minimal impact on BMD estimates. - Highlights: We investigate to what extent the distribution assumption can affect BMD estimates. Both real data analysis and simulation study are conducted. BMDs estimated using hybrid method are more sensitive to distribution assumption. Summarized continuous data are adequate for BMD estimation.

  20. Technology disrupted

    SciTech Connect (OSTI)

    Papatheodorou, Y.

    2007-02-15

    Three years ago, the author presented a report on power generation technologies which in summary said 'no technology available today has the potential of becoming transformational or disruptive in the next five to ten years'. In 2006 the company completed another strategic view research report covering the electric power, oil, gas and unconventional energy industries and manufacturing industry. This article summarises the strategic view findings and then revisits some of the scenarios presented in 2003. The cost per megawatt-hour of the alternatives is given for plants ordered in 2005 and then in 2025. The issue of greenhouse gas regulation is dealt with through carbon sequestration and carbon allowances or an equivalent carbon tax. Results reveal substantial variability through nuclear power, hydro, wind, geothermal and biomass remain competitive through every scenario. Greenhouse gas scenario analysis shows coal still be viable, albeit less competitive against nuclear and renewable technologies. A carbon tax or allowance at $24 per metric ton has the same effect on IGCC cost as a sequestration mandate. However, the latter would hurt gas plants much more than a tax or allowance. Sequestering CO{sub 2} from a gas plant is almost as costly per megawatt-hour as for coal. 5 refs., 5 figs., 5 tabs.

  1. Vehicle Technologies Office: Technologies

    Broader source: Energy.gov [DOE]

    To support DOE's goal to provide clean and secure energy, the Vehicle Technologies Office (VTO) invests in research and development that:

  2. Technology Validation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Validation Technology Validation In addition to the technical challenges being addressed through research, design, and development, there are obstacles to successful implementation of fuel cells and the corresponding hydrogen infrastructure that can be addressed only by integrating the components into complete systems. After a technology achieves its technical targets in the laboratory, the next step is to show that it can work as designed within complete systems (i.e., fuel cell

  3. Evaluate disposable sample chips and complete the (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Evaluate disposable sample chips and complete the Citation Details In-Document Search Title: Evaluate disposable sample chips and complete the × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology. A paper copy of this document is also

  4. Incinerator Completes Mission in Oak Ridge | Department of Energy

    Energy Savers [EERE]

    Incinerator Completes Mission in Oak Ridge Incinerator Completes Mission in Oak Ridge December 1, 2009 - 12:00pm Addthis OAK RIDGE, Tenn. - After more than 18 years of operation and more than 35 million pounds of waste safely incinerated, the U.S. Department of Energy's (DOE) Toxic Substances Control Act (TSCA) Incinerator at the East Tennessee Technology Park (former K-25 site) in Oak Ridge shut down operations on December 2. During its operating lifetime, the one-of-a-kind thermal treatment

  5. Appendix I - GPRA06 solar energy technologies program documentation

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    This appendix provides detailed information on the assumptions and methods employed to estimate the benefits of EEREs Solar Energy Technologies Program. The benefits analysis for the Solar Program utilized both NEMS and MARKAL as the analytical tools for estimating the Programs benefits. As will be discussed below, a number of assumptions and structural modifications to the models were made in order to represent the suite of solar technologies funded by the program as accurately as possible (Photovoltaics, Concentrating Solar Power and Solar Water Heating). Many of the assumptions used in the FY06 analysis are the same as or similar to those employed in the FY05 analysis; however, two key changes are important to highlight up-front. First, the AEO2004 analysis used a new set of reference case assumptions with respect to photovoltaic technology cost reductions. The new sets of reference case assumptions are very similar to the Solar Programs targets for PV. This shift in assumptions necessitated developing a new approach for estimating the baseline (i.e., no program) input assumptions for PV. Second, the FY06 analysis included CSP technology benefits CSP benefits were not included in the FY05 analysis.

  6. Los Alamos National Laboratory completes demolition, recycling...

    National Nuclear Security Administration (NNSA)

    completes demolition, recycling of former Administration Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  7. Building Technologies Program: Planned Program Activities for 2008-2012

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Complete Multi-Year Program Plan 2008 includes all sections - overview, research and development, standards, technology validation, portfolio management, appendices.

  8. Westinghouse Completes its AP1000® Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes its AP1000® Test Stand Last June, CASL launched its first Virtual Environment for Reactor Applications (VERA) Test Stand on the Westinghouse engineering computer cluster. Westinghouse selected the AP1000® pressurized water reactor (PWR) first core for the Test Stand simulation because its advanced design and operational features, and imminent deployment in units under construction, make it a particularly relevant and engaging application of CASL technology. The Westinghouse Test

  9. Electroproduction and gluonic production of J/{psi} mesons under the assumption of quark-hadron duality

    SciTech Connect (OSTI)

    Berezhnoy, A. V. Likhoded, A. K.

    2008-02-15

    On the basis of the assumption of quark-hadron duality, it is shown that the color-singlet contribution to the cross sections for the processes e + g {sup {yields}} e + J/{psi} + g and gg {sup {yields}} J/{psi}g increases upon taking into account the relative motion of quarks in the J/{psi} meson.

  10. Electroproduction and gluonic production of J/{psi} mesons under the assumption of quark-hadron duality

    SciTech Connect (OSTI)

    Berezhnoy, A. V.; Likhoded, A. K.

    2008-02-15

    On the basis of the assumption of quark-hadron duality, it is shown that the color-singlet contribution to the cross sections for the processes e + g {yields} e + J/{psi} + g and gg {yields} J/{psi}g increases upon taking into account the relative motion of quarks in the J/{psi} meson.

  11. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J. , Blocksome; Michael A. , Parker; Jeffrey J.

    2011-02-15

    Methods, systems, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA on an origin node in an origin injection FIFO, a data descriptor for an application message; inserting, by the origin DMA, a reflection descriptor in the origin injection FIFO, the reflection descriptor specifying a remote get operation for injecting a completion notification descriptor in a reflection injection FIFO on a reflection node; transferring, by the origin DMA to a target node, the message in dependence upon the data descriptor; in response to completing the message transfer, transferring, by the origin DMA to the reflection node, the completion notification descriptor in dependence upon the reflection descriptor; receiving, by the origin DMA from the reflection node, a completion packet; and notifying, by the origin DMA in response to receiving the completion packet, the origin node's processing core that the message transfer is complete.

  12. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Parker, Jeffrey J.

    2011-02-15

    DMA transfer completion notification includes: inserting, by an origin DMA engine on an origin node in an injection first-in-first-out (`FIFO`) buffer, a data descriptor for an application message to be transferred to a target node on behalf of an application on the origin node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying a packet header for a completion notification packet; transferring, by the origin DMA engine to the target node, the message in dependence upon the data descriptor; sending, by the origin DMA engine, the completion notification packet to a local reception FIFO buffer using a local memory FIFO transfer operation; and notifying, by the origin DMA engine, the application that transfer of the message is complete in response to receiving the completion notification packet in the local reception FIFO buffer.

  13. Subsea completions set for growth, standardization

    SciTech Connect (OSTI)

    Baugh, B.F.

    1988-08-22

    There have been enough subsea completion systems installed to permit categorization of some basic combinations and to permit users to choose from alternative styles. Nevertheless, advances in engineering standards, increasing capabilities, and a growing market will continue to make this an exciting area during the next 10 to 20 years. Fundamentally, subsea completion systems provide the same capabilities as surface completion and injection wells. However, they are of course more complex to accommodate special needs associated with subsea and remote operations. As of the end of 1987, there had been 472 subsea completions installed. A total of 671 future subsea completions have been identified. These completions have been characterized by differences in styles, applications, manufacturer designs, and user preferences. Subsea completions are characterized by many alternatives for construction and operation. As a result, they cannot be simply categorized by as few styles. Identifying these basic combinations gives the reader the capability to envision the alternatives which might suit his or her particular needs.

  14. Assessment of Gasification-Based Biorefining at Kraft Pulp and Paper Mills in the United States, Part A: Background and Assumptions

    SciTech Connect (OSTI)

    Larson, E. D.; Consonni, S.; Katofsky, R. E.; Iisa, K.; Frederick, W. J., Jr.

    2008-11-01

    Commercialization of black liquor and biomass gasification technologies is anticipated in the 2010-2015 time frame, and synthesis gas from gasifiers can be converted into liquid fuels using catalytic synthesis technologies that are already commercially established in the gas-to-liquids or coal-to-liquids industries. This set of two papers describes key results from a major assessment of the prospective energy, environmental, and financial performance of commercial gasification-based biorefineries integrated with kraft pulp and paper mills [1]. Seven detailed biorefinery designs were developed for a reference mill in the southeastern United States, together with the associated mass/energy balances, air emissions estimates, and capital investment requirements. The biorefineries provide chemical recovery services and co-produce process steam for the mill, some electricity, and one of three liquid fuels: a Fischer-Tropsch synthetic crude oil (which could be refined to vehicle fuels at an existing petroleum refinery), dimethyl ether (a diesel engine fuel or propane substitute), or an ethanol-rich mixed-alcohol product. This paper describes the key assumptions that underlie the biorefinery designs. Part B will present analytical results.

  15. MODELING ASSUMPTIONS FOR THE ADVANCED TEST REACTOR FRESH FUEL SHIPPING CONTAINER

    SciTech Connect (OSTI)

    Rick J. Migliore

    2009-09-01

    The Advanced Test Reactor Fresh Fuel Shipping Container (ATR FFSC) is currently licensed per 10 CFR 71 to transport a fresh fuel element for either the Advanced Test Reactor, the University of Missouri Research Reactor (MURR), or the Massachusetts Institute of Technology Research Reactor (MITR-II). During the licensing process, the Nuclear Regulatory Commission (NRC) raised a number of issues relating to the criticality analysis, namely (1) lack of a tolerance study on the fuel and packaging, (2) moderation conditions during normal conditions of transport (NCT), (3) treatment of minor hydrogenous packaging materials, and (4) treatment of potential fuel damage under hypothetical accident conditions (HAC). These concerns were adequately addressed by modifying the criticality analysis. A tolerance study was added for both the packaging and fuel elements, full-moderation was included in the NCT models, minor hydrogenous packaging materials were included, and fuel element damage was considered for the MURR and MITR-II fuel types.

  16. CBI Technology Impact Framework

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CBI Technology Impact Framework 2014 Building Technologies Office Peer Review Images courtesy CREE, True Manufacturing, A.O. Smith, Bernstein Associates, Cambridge Engineering, Alliance Laundry Systems, NREL Amy Jiron, amy.jiron@go.doe.gov U.S. Department of Energy Dan Chwastyk, dan.chwastyk@navigant.com Navigant Consulting Project Summary Timeline: Start date: December 2013 Planned end date: TBD (annual go/no-go) Key Milestones 1. Initial tech sweep completed; Feb 2014 2. Release of RFI; Mar

  17. FEMP Offers New Training Series on Renewable Energy Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the grid. By completing the series, participants will learn to: Understand geographicclimate considerations, renewable energy technology capabilities and constraints, and...

  18. Completing the CCT mission: The challenge of change

    SciTech Connect (OSTI)

    Monk, J.R.

    1997-12-31

    In order to complete the clean coal technology mission it will be necessary to determine CCT`s role in the restructured electricity industry and develop a strategy to promote that role. First, one must understand where the industry is headed and how clean coal technology fits into that future. Then, one needs to develop a strategy for getting from here to there, from where CCT is today to where it must be in five, ten or twenty years to be a viable option for decision-makers. Coal makes sense for the United States for several important reasons, not the least of which is its abundance here. It also makes sense in terms of its economic impact on large areas of the nation. And if coal makes sense, especially economically, then clean coal technology makes even more sense because of its potential to capitalize on this abundant resource in an environmentally friendly manner. But after nearly thirty years of involvement in the political world at all levels from Washington, D.C. to Washington, Indiana, the author has learned the hard way that ``common sense`` does not always, or even often, carry the day in the policymaking process. He believes that the future of clean coal technology hinges on the ability in the next few months and years to mobilize all those who favor that technology to move forward in a cohesive and coordinated effort to affect the policymaking and political process and thereby promote and accelerate CCT development. If this can be done, then the nation will be well on the way to completing the clean coal technology mission and meeting the challenge of change.

  19. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Archer, Charles J.; Blocksome, Michael A.; Parker, Jeffrey J.

    2010-08-17

    Methods, apparatus, and products are disclosed for DMA transfer completion notification that include: inserting, by an origin DMA engine on an origin compute node in an injection FIFO buffer, a data descriptor for an application message to be transferred to a target compute node on behalf of an application on the origin compute node; inserting, by the origin DMA engine, a completion notification descriptor in the injection FIFO buffer after the data descriptor for the message, the completion notification descriptor specifying an address of a completion notification field in application storage for the application; transferring, by the origin DMA engine to the target compute node, the message in dependence upon the data descriptor; and notifying, by the origin DMA engine, the application that the transfer of the message is complete, including performing a local direct put operation to store predesignated notification data at the address of the completion notification field.

  20. Technology Solutions for Mitigating Environmental Impacts of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CONTACT Albert B. Yost II Technology Manager Exploration & Production Strategic Center for ... active or recently completed extramural projects in the Environmental Program, for a ...

  1. Telio Solar Technologies Inc | Open Energy Information

    Open Energy Info (EERE)

    A CIGS start-up recently completed the construction of pilot line for manufacturing CIGS cell measuring 300 millimeters by 300. References: Telio Solar Technologies Inc1 This...

  2. Synagro Technologies Inc | Open Energy Information

    Open Energy Info (EERE)

    Zip: TX 77057 Product: Synagro, a residuals mangement company, also provides complete biogas cogeneration systems. References: Synagro Technologies Inc.1 This article is a stub....

  3. Drilling Complete on Australian Hot Dry Rock Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Drilling Complete on Australian Hot Dry Rock Project Drilling Complete on Australian Hot Dry Rock Project January 23, 2008 - 4:37pm Addthis The first commercial attempt to create a commercial geothermal power plant using hot dry rock technology reached a crucial milestone on January 22, when a production well successfully reached its target depth. Hot dry rock technology was invented to draw energy from deep underground areas where geothermal heat is abundant, but no water exists to carry the

  4. JOBAID-LAUNCHING AND COMPLETING ASSIGNED SURVEY

    Broader source: Energy.gov [DOE]

    The purpose of this job aid is to guide users through the step-by-step process of launching and completing assigned surverys.

  5. Geothermal Well Completion Tests | Open Energy Information

    Open Energy Info (EERE)

    and immediately after drilling activities are completed. Author Hagen Hole Conference Petroleum Engineering Summer School; Dubrovnik, Croatia; 20080609 Published NA, 2008 DOI...

  6. Environmental Remediation program completes legacy mercury cleanup...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stories Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a ...

  7. Hanford Site Cleanup Completion Framework - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RIFS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site Cleanup Completion Framework Email Email...

  8. DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9. Technology Validation Introduction In addition to the technical challenges being addressed through research, design, and development, there are obstacles to successful implementation of fuel cells and the corresponding hydrogen infrastructure that can be addressed only by integrating the components into complete systems. After a technology achieves its technical targets in the laboratory, the next step is to show that it can work as designed within complete systems (i.e., fuel cell vehicles

  9. HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY

    SciTech Connect (OSTI)

    M.A. Ebadian

    1999-04-30

    The final data package has been completed for the Mississippi State University, DIAL FTP Wall Depth Removal Characterization Technology. The package has been sent to DIAL for comments. Work is progressing on completing the transfer of glove boxes and tanks from Rocky Flats to FIU-HCET for the purpose of performing size reduction technology assessments. Vendors are being identified and security measures are being put in place to meet the High Risk Property criteria required by Rocky Flats. The FIU-HCET Technology Assessment Program has been included as one of 11 verification programs across the US and Canada described in the Interstate Technology Regulatory Cooperation (ITRC) document, ''Multi-state Evaluation of Elements Important to the Verification of Remediation Technologies'', dated January 1999. FIU-HCET will also participate in a panel discussion on technology verification programs at the International Environmental Technology Expo '99.

  10. Completion practices in deep sour Tuscaloosa wells

    SciTech Connect (OSTI)

    Huntoon, G.G.

    1984-01-01

    Successful development of the Tuscaloosa trend in Louisiana has required unique completion practices to produce the trend's deep sour formations. Amoco's operations in the Tuscaloosa formation are between 16,000 and 21,000 ft (4877 and 6400 m), and a range of pressure environments, high temperatures, and corrosive elements is encountered. Application of proved completion practices and equipment has resulted in several techniques that enhance the safety, longevity, and production capacity of these wells. The design of deep Tuscaloosa completions is assisted by a series of correlations developed to project bottomhole and surface shut-in tubing pressures, temperature gradients, and flow capacities for deep sour wells. This paper discusses material selection, completion practices, completion fluids, wellhead equipment, packer designs, corrosion-inhibition systems, and safety and monitoring equipment used in the Tuscaloosa trend. The design of a wellhead surface installation used to detect equipment failure, to pump kill fluids, and to circulate corrosion inhibitors is reviewed. A case study illustrates the methods used in completing a Tuscaloosa well with surface pressures exceeding 16,000 psi (110.3 MPa). Deep high-pressure sour-gas wells can be completed safely if all the elements of the environment that will affect the mechanical integrity of the wellbore are considered in the completion designs. The development of higher-strength material capable of withstanding SSC is needed if wells are completed in formations deeper than 22,000 ft (6700 m). Further research is necessary on the use of alloy steels and nonferrous metals for sour service. Effective high-temperature corrosion inhibitors for heavy zinc bromide completion fluids must be developed before these brines can be used in the Tuscaloosa. The testing of new inhibitors for use in highpressure sour-gas completions should be continued.

  11. Carbon Storage Partner Completes First Year of CO2 Injection Operations in

    Energy Savers [EERE]

    Illinois | Department of Energy Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois November 19, 2012 - 12:00pm Addthis Washington, DC - A project important to demonstrating the commercial viability of carbon capture, utilization and storage (CCUS) technology has completed the first year of injecting carbon dioxide (CO2) from an industrial plant at a large-scale test site in

  12. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A.; Kumar, Sameer; Parker, Jeffrey J.

    2014-07-01

    Completion processing of data communications instructions in a distributed computing environment with computers coupled for data communications through communications adapters and an active messaging interface (`AMI`), injecting for data communications instructions into slots in an injection FIFO buffer a transfer descriptor, at least some of the instructions specifying callback functions; injecting a completion descriptor for each instruction that specifies a callback function into an injection FIFO buffer slot having a corresponding slot in a pending callback list; listing in the pending callback list callback functions specified by data communications instructions; processing each descriptor in the injection FIFO buffer, setting a bit in a completion bit mask corresponding to the slot in the FIFO where the completion descriptor was injected; and calling by the AMI any callback functions in the pending callback list as indicated by set bits in the completion bit mask.

  13. Cost estimate guidelines for advanced nuclear power technologies

    SciTech Connect (OSTI)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs.

  14. Fuels Technologies

    Office of Environmental Management (EM)

    Fuels Technologies Program Mission To develop more energy efficient and environmentally friendly highway transportation technologies that enable America to use less petroleum. --EERE Strategic Plan, October 2002-- Kevin Stork, Team Leader Fuel Technologies & Technology Deployment Vehicle Technologies Program Energy Efficiency and Renewable Energy U.S. Department of Energy DEER 2008 August 6, 2008 Presentation Outline n Fuel Technologies Research Goals Fuels as enablers for advanced engine

  15. Property:CompletionNotes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  16. Environmental Management Completed Projects 2005-Present

    Broader source: Energy.gov [DOE]

    This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project’s performance related to cost, schedule, and...

  17. Definition of Environmental Management (EM) Completion

    Office of Environmental Management (EM)

    ects is the point at which a project may proceed to Completion. Highlight 1 - Exit Strategies An exit strategy comprises the set of information that will be used to demonstrate...

  18. EM's Paducah Site Completes Building Removals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM's Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals Addthis

  19. CWI Completes Pit 9 Waste Exhumation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CWI Completes Pit 9 Waste Exhumation Cleanup crews with CH2M-WG Idaho (CWI), the main cleanup contractor at the Department of Energy's Idaho Site, have completed targeted waste removal from Pit 9 several months ahead of schedule and millions of dollars under budget. About $12 million in American Recovery and Reinvestment Act savings from other cleanup projects, in addition to about $22 million in dedicated funds, were used to finance the Pit 9 project. A specially modified waste excavator was

  20. First trillion particle cosmological simulation completed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First trillion particle cosmological simulation completed First trillion particle cosmological simulation completed A team of astrophysicists and computer scientists has created high-resolution cyber images of our cosmos. January 8, 2015 Simulation of the cosmic web of the dark matter mass distribution. This region represents about 1/10,000 of the total simulation volume. Simulation of the cosmic web of the dark matter mass distribution. This region represents about 1/10,000 of the total

  1. Lab completes record year for environmental cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new

  2. LANL completes CRADA with Biomagnetics, Inc.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CRADA with Biomagnetics, Inc. completed LANL completes CRADA with Biomagnetics, Inc. The CRADA was created to continue work on developing a commercial product that could detect a specific biomarker in urine that could aid in the diagnosis of tuberculosis infection. September 23, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable

  3. Lab completes Recovery Act-funded demolition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act-funded demolition completed Lab completes Recovery Act-funded demolition The building was the largest of the 24 demolished at LANL's historic Technical Area 21. January 19, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of

  4. Subsea completion data show steady activity levels

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1993-02-01

    Review of subsea completion statistics indicates 45 installations during 1992 - one more than during 1991. The 45 installations are still considerably less than the all-time high of 66 installations in 1985. Petrobras continues to install three times as many subsea completions as Shell, the next most active user. However, as in the past three years, the overall-lower number of installations last year was due to reduced applications by Petrobras. During 1991, that company installed 10 subsea completions, whereas during 1988, for example, it completed 37 installations. It should be noted that reduced activity by petrobras reflects problems with financing and general activity, rather than a lack of confidence in subsea completions. The number of future subsea completions identified for installation during the next 10 years is 1,144 - some 10% more than the 1,014 identified at the end of 1991. The present planned installation figure is an all-time high; the next highest number of installations identified was 1,083 at the end of 1989. These and other statistics are presented in 10 tables. A brief analysis of each is included.

  5. Exploration Technologies - Technology Needs Assessment

    SciTech Connect (OSTI)

    Greene, Amanda I.; Thorsteinsson, Hildigunnur; Reinhardt, Tim; Solomon, Samantha; James, Mallory

    2011-06-01

    This assessment is a critical component of ongoing technology roadmapping efforts, and will be used to guide the Geothermal Technology Program's research and development.

  6. Field installation proves coiled tubing ESP completions successful

    SciTech Connect (OSTI)

    Tovar, J.J.; Head, P.; Jordan, R.

    1995-06-01

    Coiled tubing (CT) technology has contributed new and innovative solutions for wells using electrical submersible pumps (ESP). A CT-ESP deployment system was developed as part of a joint industry project to take advantage of this new technology. Ten oil and service companies and the EEC, under the Thermie program, participated in its development. Two main areas were identified to introduce these innovations. The first was deployment and well control. This area has a great impact on the safety and operational aspects of installing and servicing ESPs. The second is cost. As ESPs are considered for new field developments and recompletion of old fields, installation and workover costs play a major role in the selection of completion alternatives. One of the main limitations of ESPs in the past has been the economics of installation and uncertainty about pump life. With focus in these two major areas, a system was successfully produced that offers considerable advantages over existing technologies. The reduction in rig time and equipment cost makes this alternative very attractive for areas where technical and economic obstacles such as live well deployment and high operating cost limit the use of ESP technology. Two field tests have been carried successfully during the development of this system.

  7. UTSI/CFFF MHD PROGRAM COMPLETION AND RELATED ACTIVITY

    SciTech Connect (OSTI)

    Joel W. Muehlhauser

    2004-07-21

    In this final technical report, UTSI summarizes work completed under DOE Contract No. DE-AC22-95PC95231. This work began on the contract effective date, September 15, 1995 and is continuing on a very small basis to complete the groundwater remediation as of this date. The work scope required UTSI to continue to maintain the DOE Coal Fired Flow Facility and keep it in readiness for anticipated testing. This effort was terminated in September 1998 by DOE stop-work letter. Work continued on reporting, environmental restoration and on the High Temperature Superconductivity work that was underway. The work included preparing reports on the MHD POC tests that had been completed just prior to this contract initiation under an earlier contract with DOE Chicago. These four reports are summarized herein. This report summarizes the environmental restoration work performed under the contract, including groundwater monitoring and remediation, removal of wastes from the facility, removal of asbestos from the cooling tower and actions in compliance with the license to discharge water into Woods Reservoir. This report covers work in support of the DOE High Temperature Superconductivity program including: (1) Assistance to DOE in preparing a development plan; (2) Cooperation with industry, national laboratories and other universities to promote the commercialization of thin film superconductors (coated conductors); (3) Process Evaluations; (4) Process Diagnostic Development; and (5) Process Economics. The assistance to DOE task included convening an advisory board composed of all the major participants in the DOE program and preparing a draft development plan and Research and Development Roadmap leading to commercialization of the coated conductor technology. Under this program, cooperative agreements and cooperative work was undertaken with Oak Ridge National Laboratory, Midwest Superconductivity, Inc., EURUS Technologies, Inc., Westinghouse Electric Company, and others. In the process evaluation task, four studies were completed by faculty, staff and students. Summaries of these studies are included in this report. In process diagnostic development, three studies were completed, all emphasizing diagnostics that are applicable to real time control of manufacturing processes. In Process Economics, one study was completed that estimated the manufacturing cost of superconducting wire produced by two of the process thought to be most promising.

  8. NREL: Technology Transfer - Technology Partnership Agreements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ombuds. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Agreements for Commercializing Technology CRADAs Work for...

  9. High Impact Technology Catalyst: Technology Deployment Strategies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Catalyst: Technology Deployment Strategies High Impact Technology Catalyst: Technology Deployment Strategies The Energy Department released the High Impact Technology Catalyst: ...

  10. Drilling technology/GDO

    SciTech Connect (OSTI)

    Kelsey, J.R.

    1985-01-01

    The Geothermal Technology Division of the US Department of Energy is sponsoring two programs related to drilling technology. The first is aimed at development of technology that will lead to reduced costs of drilling, completion, and logging of geothermal wells. This program has the official title ''Hard Rock Penetration Mechanics.'' The second program is intended to share with private industry the cost of development of technology that will result in solutions to the near term geothermal well problems. This program is referred to as the ''Geothermal Drilling Organization''. The Hard Rock Penetration Mechanics Program was funded at $2.65M in FY85 and the GDO was funded at $1.0M in FY85. This paper details the past year's activities and accomplishments and projects the plans for FY86 for these two programs.

  11. Technology Transfer Reporting Form

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This form is to be completed by the TTO for individual inquiry/case activity during the quarter as required by the Technology Transfer Commercialization Act of 2000. Mouse over definitions and descriptions appear over text/check boxes where appropriate. After completing this form, click on the submit button. *If you have no TTO activity for the quarter, please fill in your name, FY and quarter, lab or facility and check the box "No Quarterly Activity". Initial Ombuds Contact:

  12. Completion processing for data communications instructions

    DOE Patents [OSTI]

    Blocksome, Michael A; Kumar, Sameer; Parker, Jeffrey J

    2014-05-20

    Completion processing of data communications instructions in a distributed computing environment, including receiving, in an active messaging interface (`AMI`) data communications instructions, at least one instruction specifying a callback function; injecting into an injection FIFO buffer of a data communication adapter, an injection descriptor, each slot in the injection FIFO buffer having a corresponding slot in a pending callback list; listing in the pending callback list any callback function specified by an instruction, incrementing a pending callback counter for each listed callback function; transferring payload data as per each injection descriptor, incrementing a transfer counter upon completion of each transfer; determining from counter values whether the pending callback list presently includes callback functions whose data transfers have been completed; calling by the AMI any such callback functions from the pending callback list, decrementing the pending callback counter for each callback function called.

  13. Subsea completions: A record year in '93

    SciTech Connect (OSTI)

    Mohr, H.O. )

    1994-02-01

    Review of subsea completion statistics for 1993 shows 78 installations--an 18% increase over the previous all-time high of 66 installations during 1985. Risking some dramatics, the 78 installations during '93 represent a 73% increase over the 45 installations during '92. And enthusiasm and positive outlook for continued application of subsea completions is clearly indicated in all major areas of the offshore world. Data suggest that the activity should continue to rise strongly toward the year 2000. At the end of 1993, the number of future subsea completions identified for installation during the next 10 years is 1,315--up 15% from the 1,144 identified at year-end 1992. The next highest number identified was 1,083 at the end of 1989, supporting a positive trend.

  14. Vehicle Technologies Office - Materials Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technologies Office Materials Technologies Ed Owens Jerry Gibbs Will Joost eere.energy.gov 2 | Vehicle Technologies Program Materials Technologies Materials Technologies $36.9 M Lightweight Materials $28.0 M Values are FY14 enacted Propulsion Materials $8.9 M Properties and Manufacturing Multi-Material Enabling Modeling & Computational Mat. Sci. Engine Materials, Cast Al & Fe High Temp Alloys Exhaust Sys. Materials, Low T Catalysts Lightweight Propulsion FY13 Enacted $27.5 M

  15. Coiled tubing enables rapid CO{sub 2} completions

    SciTech Connect (OSTI)

    Payton, R.; Baker, R.; Turner, D.; Bertrand, B.

    1996-08-01

    In the Bravo Dome field of northeastern New Mexico, Amoco has doubled their expected carbon dioxide (CO{sub 2}) production and reduced completion costs by 7.5% using coiled tubing in conjunction with other technologies. Amoco initially expected to produce an average 2.6 MMcfd per well. Instead, six months after completing the 31-well package, the company is producing an average 5.1 MMcfd. Important elements contributing cost and time savings on the project were: Log analysis to select perforations and help prevent water production, and lost circulation; the mobility and flexibility of coiled tubing; using cement for low-cost lost circulation control; using thermoplastic film to prevent proppant flowback; fracture designs optimized for each well; and forming an alliance between Amoco and vendors and developing of mutual trust. Amoco and other producing companies use about 95% of the CO{sub 2} produced at Amoco`s Bravo Dome field for enhanced oil recovery (EOR) projects in the Permian Basin area. Amoco sells 5% of the purest product to companies in the US food industry. While the low price of CO{sub 2}, about one-fourth that of methane, furnished part of the impetus for Amoco to implement the cost-cutting methods at Bravo Dome, the methods can be applied in many completion applications and are discussed in this paper.

  16. Taking technology to market

    SciTech Connect (OSTI)

    Ford, D.; Ryan, C.

    1981-03-01

    For many years, the concept of the product life cycle has helped managers maximize their return on product sales. But according to the authors of this article, using a technology solely in product sales is no longer enough. Today, companies face high R and D costs, competitive pressures from low-cost producers, capacity limitations, antitrust laws, financial difficulties, and foreign trade barriers. This means that they must improve the rate of return on their technology investments by marketing their technology as completely as possible during all phases of its life cycle. The technology life cycle - derived from the product life cycle - pinpoints the changing decisions companies face in selling their know-how. The authors also discuss both the competitive dangers of transferring technology to low-cost foreign producers and the growing role of intermediaries in technology sales. They stress the importance of having a highly specialized staff to plan a company's technology marketing, a responsibility that should be assigned neither to the part-time attention of top management nor simply to marketers or strategic planners.

  17. Available Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    application. Search Our Technologies submit Advanced Materials Advanced Materials Biotechnology Biotechnology Chemistry Chemistry Energy Energy High Performance Computing:...

  18. Licensing Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technology Licensing Technology The primary function of Los Alamos Licensing Program is to move Los Alamos technology to the marketplace for the benefit of the U.S. economy. Our intellectual property may be licensed for commercial use, research applications, and U.S. government use. Contact thumbnail of Marcus Lucero Head of Licensing Marcus Lucero Richard P. Feynman Center for Innovation (505) 665-6569 Email Although Los Alamos's primary mission is national security, our technologies

  19. Technology Opportunities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Intellectual Property » Technology Opportunities Technology Opportunities We deliver innovation through an integrated portfolio of R&D work across our key national security sponsoring agencies, enhanced by the ideas developed through our strategic internal investments. Contact Business Development Team Richard P. Feynman Center for Innovation (505) 665-9090 Email Periodically, the Laboratory notifies the public of technologies and capabilities that may be of interest. These technologies may

  20. Technology Partnering

    Energy Savers [EERE]

    on Technology Transfer and Related Technology Partnering Activities at the National Laboratories and Other Facilities Fiscal Years 2009-2013 Report to Congress May 2015 United States Department of Energy Washington, DC 20585 Message from the Secretary The Report on Technology Transfer and Related Partnering Activities at the National Laboratories and Other Facilities for Fiscal Year 2009-2013 is prepared in accordance with the requirements of the Technology Transfer and Commercialization Act of

  1. Energy Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technologies Our Vision National User Facilities Research Areas In Focus Global Solutions ⇒ Navigate Section Our Vision National User Facilities Research Areas In Focus Global Solutions Energy Technologies Area (ETA) Building Technology & Urban Systems Energy Analysis & Environmental Impacts Energy Storage & Distributed Resources

  2. Technology Assessment

    Energy Savers [EERE]

    - FOR OFFICIAL USE ONLY - DRAFT 1 Advanced Composites Materials and their Manufacture 1 Technology Assessment 2 Contents 3 1. Introduction to the Technology/System ................................................................................................ 2 4 2. Technology Potential and Assessment .................................................................................................. 4 5 2.1 The Potential for Advanced Composites for Clean Energy Application Areas

  3. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that

  4. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARBON CAPTURE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its

  5. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  6. Power Technologies Energy Data Book - Fourth Edition

    SciTech Connect (OSTI)

    Aabakken, J.

    2006-08-01

    This report, prepared by NREL's Strategic Energy Analysis Center, includes up-to-date information on power technologies, including complete technology profiles. The data book also contains charts on electricity restructuring, power technology forecasts, electricity supply, electricity capability, electricity generation, electricity demand, prices, economic indicators, environmental indicators, and conversion factors.

  7. New technology for the independent producer

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This technology transfer conference consisted of the following six sessions: reservoir characterization; drilling, testing and completion; enhanced oil recovery; 3-d seismic and amplitude variation with offset (AVO); biotechnology for field applications; and well logging technology. Selected papers have been processed separately for inclusion in the Energy Science and Technology Database.

  8. National Rotor Testbed aerodynamic design complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    aerodynamic design complete - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  9. Lab completes first Recovery Act cleanup project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL Recovery Act cleanup Lab completes first Recovery Act cleanup project The $13 million project involved demolition of an 18,000-square-foot former nuclear fusion research facility. August 4, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits

  10. JLab Completes 100th Experiment | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Completes 100th Experiment The experiment, titled "Quark Propagation through Cold QCD Matter," began its run in December 2003 and wrapped up in early March. It probed Quantum Chromodynamics (QCD), a fundamental theory of particle physics that describes the interactions of quarks and gluons - the basic building blocks of matter. A property of QCD, called confinement, states that no quark can ever be found alone. Instead, quarks combine in pairs or triplets to make up larger particles.

  11. Complete Project List | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complete Project List Researchers at the Critical Materials Institute work to find ways to diversify supplies of critical materials, develop substitutes, improve reuse and recycling, enable research, sustain the environment, study the supply chain and analyze economics. The institute started with more than 30 projects. Over time, some have merged or ended and others have been added. This page provides a list of the current CMI projects, which can be sorted by clicking on a column header. Project

  12. Deepwater completion and tieback -- A case study

    SciTech Connect (OSTI)

    Ghiselin, D.

    1996-10-01

    Major operators are engaged in large-scale integrated projects around the world. Does integration favor the big boys, or can a small independent operator benefit from this approach? Independent partners Hardy Oil and Gas USA and Samedan Oil Corp. looked into integrated project management to successfully design and install subsea completions, subsea pipelines, and platform tiebacks and interfaces to two platforms operated by Texaco and Chevron, respectively. The paper describes the project management approach taken and results of the project.

  13. PSA_Well_Completion_Report.book

    Office of Legacy Management (LM)

    Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Environmental Restoration Project U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Nevada Environmental Restoration Project Well Completion Report for Corrective Action Unit 447, Project Shoal Area Churchill County, Nevada Revision No.: 0 September 2006 Approved for public release; further dissemination unlimited. DOE/NV--1166 Available for public sale,

  14. Technology '90

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The US Department of Energy (DOE) laboratories have a long history of excellence in performing research and development in a number of areas, including the basic sciences, applied-energy technology, and weapons-related technology. Although technology transfer has always been an element of DOE and laboratory activities, it has received increasing emphasis in recent years as US industrial competitiveness has eroded and efforts have increased to better utilize the research and development resources the laboratories provide. This document, Technology '90, is the latest in a series that is intended to communicate some of the many opportunities available for US industry and universities to work with the DOE and its laboratories in the vital activity of improving technology transfer to meet national needs. Technology '90 is divided into three sections: Overview, Technologies, and Laboratories. The Overview section describes the activities and accomplishments of the DOE research and development program offices. The Technologies section provides descriptions of new technologies developed at the DOE laboratories. The Laboratories section presents information on the missions, programs, and facilities of each laboratory, along with a name and telephone number of a technology transfer contact for additional information. Separate papers were prepared for appropriate sections of this report.

  15. DOE completes demolition of K-31 gaseous diffusion building | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy completes demolition of K-31 gaseous diffusion building DOE completes demolition of K-31 gaseous diffusion building June 26, 2015 - 1:31pm Addthis Workers take down the last section of the K-31 Building. Workers take down the last section of the K-31 Building. OAK RIDGE, Tenn. - Demolition of the K-31 Building at Oak Ridge's East Tennessee Technology Park (ETTP) was completed today, marking the removal of the fourth of five gaseous diffusion buildings at the former uranium enrichment

  16. Diamond Shamrock nears completion of major expansions

    SciTech Connect (OSTI)

    True, W.R.

    1993-05-24

    With completion later this year of a second refined products line into Colorado, Diamond Shamrock Inc., San Antonio, will have added more than 600 miles of product and crude-oil pipeline on its system and expanded charge and production capacities at its two state-of-the-art refineries, all within 30 months. The projects aim at improving the company's ability to serve markets in the U.S. Southwest and increasing capacities and flexibility at its two refineries. The paper describes these projects under the following headings: new products service; another new line; and refineries, crude pipelines; Three Rivers expansion and Supplies for McKee.

  17. Instructions For Completing Certified Payroll Report Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wage and Hour Division (WHD) Instructions For Completing Payroll Form, WH-347 * OMB Control No. 1235-0008, Expires 02/28/2018. General: Form WH-347has been made available for the convenience of contractors and subcontractors required by their Federal or Federally-aided construction-type contracts and subcontracts to submit weekly payrolls. Properly filled out, this form will satisfy the requirements of Regulations, Parts 3 and 5 (29 C.F.R., Subtitle A), as to payrolls submitted in connection

  18. Huazhong Science Technology University Yongtai Science Technology...

    Open Energy Info (EERE)

    Huazhong Science Technology University Yongtai Science Technology Co Ltd Jump to: navigation, search Name: Huazhong Science & Technology University Yongtai Science & Technology Co...

  19. NREL: Technology Deployment - Technology Acceleration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology Acceleration NREL offers technology-specific assistance to federal and private industry to help address market barriers to sustainable energy technologies. Learn more about NREL's work in the following areas: Biopower and Waste-to-Energy Biopower and Waste-to-Energy Buildings Buildings Fuels, Vehicles, & Transportation Fuels, Vehicles, and Transportation Microgrid Design Microgrid Design Solar Solar Wind Wind Contact Us For more information on NREL's market transformation work,

  20. Thermally activated technologies: Technology Roadmap

    SciTech Connect (OSTI)

    None, None

    2003-05-01

    The purpose of this Technology Roadmap is to outline a set of actions for government and industry to develop thermally activated technologies for converting Americas wasted heat resources into a reservoir of pollution-free energy for electric power, heating, cooling, refrigeration, and humidity control. Fuel flexibility is important. The actions also cover thermally activated technologies that use fossil fuels, biomass, and ultimately hydrogen, along with waste heat.

  1. Technology Assessment

    Energy Savers [EERE]

    Roll to Roll (R2R) Processing 1 Technology Assessment 2 3 Contents 4 1. Introduction to the Technology/System ............................................................................................... 2 5 1.1. Introduction to R2R Processing..................................................................................................... 2 6 1.2. R2R Processing Mechanisms ......................................................................................................... 3 7 2.

  2. Smart Grid Technology Interactive Model | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Smart Grid Technology Interactive Model Share Description As our attention turns to new cars that run partially or completely on electricity, how can we redesign our electric grid...

  3. Direct memory access transfer completion notification

    DOE Patents [OSTI]

    Chen, Dong; Giampapa, Mark E.; Heidelberger, Philip; Kumar, Sameer; Parker, Jeffrey J.; Steinmacher-Burow, Burkhard D.; Vranas, Pavlos

    2010-07-27

    Methods, compute nodes, and computer program products are provided for direct memory access (`DMA`) transfer completion notification. Embodiments include determining, by an origin DMA engine on an origin compute node, whether a data descriptor for an application message to be sent to a target compute node is currently in an injection first-in-first-out (`FIFO`) buffer in dependence upon a sequence number previously associated with the data descriptor, the total number of descriptors currently in the injection FIFO buffer, and the current sequence number for the newest data descriptor stored in the injection FIFO buffer; and notifying a processor core on the origin DMA engine that the message has been sent if the data descriptor for the message is not currently in the injection FIFO buffer.

  4. ER-12-1 completion report

    SciTech Connect (OSTI)

    Russell, C.E.; Gillespie, D.; Cole, J.C.; Drellack, S.L.

    1996-12-01

    The objective of drillhole ER-12-1 was to determine the hydrogeology of paleozoic carbonate rocks and of the Eleana Formation, a regional aquitard, in an area potentially downgradient from underground nuclear testing conducted in nearby Rainier Mesa. This objective was addressed through the drilling of well ER-12-1 at N886,640.26 E640,538.85 Nevada Central Coordinates. Drilling of the 1094 m (3588 ft) well began on July 19, 1991 and was completed on October 17, 1991. Drilling problems included hole deviation and hole instability that prevented the timely completion of this borehole. Drilling methods used include rotary tri-cone and rotary hammer drilling with conventional and reverse circulation using air/water, air/foam (Davis mix), and bentonite mud. Geologic cuttings and geophysical logs were obtained from the well. The rocks penetrated by the ER-12-1 drillhole are a complex assemblage of Silurian, Devonian, and Mississippian sedimentary rocks that are bounded by numerous faults that show substantial stratigraphic offset. The final 7.3 m (24 ft) of this hole penetrated an unusual intrusive rock of Cretaceous age. The geology of this borehole was substantially different from that expected, with the Tongue Wash Fault encountered at a much shallower depth, paleozoic rocks shuffled out of stratigraphic sequence, and the presence of an altered biotite-rich microporphyritic igneous rock at the bottom of the borehole. Conodont CAI analyses and rock pyrolysis analyses indicate that the carbonate rocks in ER-12-1, as well as the intervening sheets of Eleana siltstone, have been thermally overprinted following movement on the faults that separate them. The probable source of heat for this thermal disturbance is the microporphyritic intrusion encountered at the bottom of the hole, and its age establishes that the major fault activity must have occurred prior to 102.3+0.5 Ma (middle Cretaceous).

  5. The Role Of Modeling Assumptions And Policy Instruments in Evaluating The Global Implications Of U.S. Biofuel Policies

    SciTech Connect (OSTI)

    Oladosu, Gbadebo A; Kline, Keith L

    2010-01-01

    The primary objective of current U.S. biofuel law the Energy Independence and Security Act of 2007 (EISA) is to reduce dependence on imported oil, but the law also requires biofuels to meet carbon emission reduction thresholds relative to petroleum fuels. EISA created a renewable fuel standard with annual targets for U.S. biofuel use that climb gradually from 9 billion gallons per year in 2008 to 36 billion gallons (or about 136 billion liters) of biofuels per year by 2022. The most controversial aspects of the biofuel policy have centered on the global social and environmental implications of its potential land use effects. In particular, there is an ongoing debate about whether indirect land use change (ILUC) make biofuels a net source, rather sink, of carbon emissions. However, estimates of ILUC induced by biofuel production and use can only be inferred through modeling. This paper evaluates how model structure, underlying assumptions, and the representation of policy instruments influence the results of U.S. biofuel policy simulations. The analysis shows that differences in these factors can lead to divergent model estimates of land use and economic effects. Estimates of the net conversion of forests and grasslands induced by U.S. biofuel policy range from 0.09 ha/1000 gallons described in this paper to 0.73 ha/1000 gallons from early studies in the ILUC change debate. We note that several important factors governing LUC change remain to be examined. Challenges that must be addressed to improve global land use change modeling are highlighted.

  6. Technology Commercialization Showcase 2008 Vehicle Technologies Program

    SciTech Connect (OSTI)

    Davis, Patrick B.

    2009-06-19

    Presentation illustrating various technology commercialization opportunities and unexploited investment gaps for the Vehicle Technologies Program.

  7. Ceramic Technology Project

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    The Ceramic Technology Project was developed by the USDOE Office of Transportation Systems (OTS) in Conservation and Renewable Energy. This project, part of the OTS's Materials Development Program, was developed to meet the ceramic technology requirements of the OTS's automotive technology programs. Significant accomplishments in fabricating ceramic components for the USDOE and NASA advanced heat engine programs have provided evidence that the operation of ceramic parts in high-temperature engine environments is feasible. These programs have also demonstrated that additional research is needed in materials and processing development, design methodology, and data base and life prediction before industry will have a sufficient technology base from which to produce reliable cost-effective ceramic engine components commercially. A five-year project plan was developed with extensive input from private industry. In July 1990 the original plan was updated through the estimated completion of development in 1993. The objective is to develop the industrial technology base required for reliable ceramics for application in advanced automotive heat engines. The project approach includes determining the mechanisms controlling reliability, improving processes for fabricating existing ceramics, developing new materials with increased reliability, and testing these materials in simulated engine environments to confirm reliability. Although this is a generic materials project, the focus is on the structural ceramics for advanced gas turbine and diesel engines, ceramic bearings and attachments, and ceramic coatings for thermal barrier and wear applications in these engines. To facilitate the rapid transfer of this technology to US industry, the major portion of the work is being done in the ceramic industry, with technological support from government laboratories, other industrial laboratories, and universities.

  8. Sediment Properties: E-Area Completion Project

    SciTech Connect (OSTI)

    Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

    2011-04-29

    To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization and Analysis Penetrometer System (SCAPS) cone penetrometer test (CPT) truck at ECP plots 6, 7, 8 and 9 to collect inferred lithology data for the vadose zone. Results from this study are used to make recommendations for future modeling efforts involving the ECP plots. The conceptual model of the ECP hydrogeology differs from the conceptual model of the current ELLWF disposal area in that for the ECP plots, the topography (ground surface) is generally lower in elevation; The Upland and top of Tobacco Road lithostratigraphic units are missing (eroded); The water table occurs lower in elevation (i.e., it occurs in lower stratigraphic units); and the Tan Clay Confining Zone (TCCZ) often occurs within the vadose zone (rather than in the saturated zone). Due to the difference in the hydrogeology between the current ELLWF location and the ECP plots, different vadose zone properties are recommended for the ECP plots versus the properties recommended by Phifer et al. (2006) for the current disposal units. Results from this study do not invalidate or conflict with the current PA's use of the Upper and Lower Vadose Zone properties as described by Phifer et al. (2006) for the current ELLWF disposal units. The following modeling recommendations are made for future modeling of the ECP plots where vadose zone properties are required: (1) If a single vadose zone property is preferred, the properties described by Phifer et al. (2006) for the Upper Vadose Zone encompass the general physical properties of the combined sands and clays in the ECP vadose zone sediments despite the differences in hydrostratigraphic units. (2) If a dual zone system is preferred, a combination of the Lower Zone properties and the Clay properties described by Phifer et al. (2006) are appropriate for modeling the physical properties of the ECP vadose zone. The Clay properties would be assigned to the Tan Clay Confining Zone (TCCZ) and any other significant clay layers, while the Lower Zone properties would be assigned for the remainder of the vadose zone. No immediate updates or changes are recommended for

  9. Recovery Act Workers Complete Environmental Cleanup of Coal Ash...

    Office of Environmental Management (EM)

    Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a 17-acre ...

  10. Secretary Chu Announces Completion of Critical Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completion of Critical Energy Conservation Appliance Standards Secretary Chu Announces Completion of Critical Energy Conservation Appliance Standards September 1, 2009 - 12:00am ...

  11. Complete LNG Terminal Status Maps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Complete LNG Terminal Status Maps Complete LNG Terminal Status Maps A series of slides showing the status of various LNG terminals (existing, under construction, proposed, etc.) in...

  12. DOE's New Large Blade Test Facility in Massachusetts Completes...

    Energy Savers [EERE]

    DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade Tests DOE's New Large Blade Test Facility in Massachusetts Completes First Commercial Blade ...

  13. FEMP Completes 2000th Renewable Energy Optimization Screening...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP Completes 2000th Renewable Energy Optimization Screening FEMP Completes 2000th Renewable Energy Optimization Screening July 23, 2015 - 12:03pm Addthis REopt models the complex ...

  14. Nevada Proof of Completion of Work (Water Right) | Open Energy...

    Open Energy Info (EERE)

    Proof of Completion of Work (Water Right) Abstract Required notice of completion of diversion works for establishing a water right. Form Type ApplicationNotice Form Topic Proof...

  15. EM's Office of River Protection Completes Waste Retrieval in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection Completes Waste Retrieval in Another Hanford Tank EM's Office of River Protection Completes Waste Retrieval in Another Hanford Tank December 29, 2015 -...

  16. Category:Completed Case Study | Open Energy Information

    Open Energy Info (EERE)

    Apps Datasets Community Login | Sign Up Search Category Edit History Category:Completed Case Study Jump to: navigation, search List of geothermal areas that have a completed...

  17. Energy Department Completes Cool Roof Installation on DC Headquarters...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save ...

  18. Entiat 4Mile WELLs Completion Report, 2006.

    SciTech Connect (OSTI)

    Malinowksi, Richard

    2007-01-01

    The Entiat 4-mile Wells (Entiat 4-mile) project is located in the Entiat subbasin and will benefit Upper Columbia steelhead, spring Chinook and bull trout. The goal of this project is to prevent juvenile fish from being diverted into an out-of-stream irrigation system and to eliminate impacts due to the annual maintenance of an instream pushup dam. The objectives include eliminating a surface irrigation diversion and replacing it with two wells, which will provide Bonneville Power Administration (BPA) and the Bureau of Reclamation (Reclamation) with a Federal Columbia River Power System (FCRPS) BiOp metric credit of one. Wells were chosen over a new fish screen based on biological benefits and costs. Long-term biological benefits are provided by completely eliminating the surface diversion and the potential for fish entrainment in a fish screen. Construction costs for a new fish screen were estimated at $150,000, which does not include other costs associated with implementing and maintaining a fish screening project. Construction costs for a well were estimated at $20,000 each. The diversion consisted of a pushup dam that diverted water into an off-channel pond. Water was then pumped into a pressurized system for irrigation. There are 3 different irrigators who used water from this surface diversion, and each has multiple water right claims totaling approximately 5 cfs. Current use was estimated at 300 gallons per minute (approximately 0.641 cfs). Some irrigated acreage was taken out of orchard production less than 5 years ago. Therefore, approximately 6.8 acre-feet will be put into the State of Washington Trust Water Right program. No water will be set aside for conservation savings. The construction of the two irrigation wells for three landowners was completed in September 2006. The Lower Well (Tippen/Wick) will produce up to 175 gpm while the Upper Well (Griffith) will produce up to 275 gpm during the irrigation season. The eight inch diameter wells were developed to a depth of 75 feet and 85 feet, respectively, and will be pumped with Submersible Turbine pumps. The irrigation wells have been fitted with new electric boxes and Siemens flowmeters (MAG8000).

  19. GSA and DOE Seek Innovative Building Technologies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GSA and DOE Seek Innovative Building Technologies GSA and DOE Seek Innovative Building Technologies October 14, 2015 - 2:33pm Addthis GSA and DOE Seek Innovative Building Technologies To submit your technology, complete our request for information (RFI) by Friday, December 11, 2015. GSA's Green Proving Ground (GPG) program and DOE's High Impact Technology (HIT) Catalyst have issued a joint Request for Information calling for innovative emerging building technologies that can cost-effectively

  20. Tag: technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tags

    technology<...

  1. Technology Validation

    Broader source: Energy.gov [DOE]

    To reduce solar technology risks, DOE and its partners evaluate the performance and reliability of novel photovoltaic (PV) hardware and systems through laboratory and field testing. The focus of...

  2. Ventilation technologies scoping study

    SciTech Connect (OSTI)

    Walker, Iain S.; Sherman, Max H.

    2003-09-30

    This document presents the findings of a scoping study commissioned by the Public Interest Energy Research (PIER) program of the California Energy Commission to determine what research is necessary to develop new residential ventilation requirements for California. This study is one of three companion efforts needed to complete the job of determining the needs of California, determining residential ventilation requirements, and determining appropriate ventilation technologies to meet these needs and requirements in an energy efficient manner. Rather than providing research results, this scoping study identifies important research questions along with the level of effort necessary to address these questions and the costs, risks, and benefits of pursuing alternative research questions. In approaching these questions and level of effort, feasibility and timing were important considerations. The Commission has specified Summer 2005 as the latest date for completing this research in time to update the 2008 version of California's Energy Code (Title 24).

  3. Technology meets aggregate

    SciTech Connect (OSTI)

    Wilson, C.; Swan, C.

    2007-07-01

    New technology carried out at Tufts University and the University of Massachusetts on synthetic lightweight aggregate has created material from various qualities of fly ash from coal-fired power plants for use in different engineered applications. In pilot scale manufacturing tests an 'SLA' containing 80% fly ash and 20% mixed plastic waste from packaging was produced by 'dry blending' mixed plastic with high carbon fly ash. A trial run was completed to produce concrete masonry unit (CMU) blocks at a full-scale facility. It has been shown that SLA can be used as a partial substitution of a traditional stone aggregate in hot asphalt mix. 1 fig., 2 photos.

  4. Direct conversion technology

    SciTech Connect (OSTI)

    Massier, P.F.; Back, L.H.; Ryan, M.A.; Fabris, G.

    1992-01-07

    The overall objective of the Direct Conversion Technology task is to develop an experimentally verified technology base for promising direct conversion systems that have potential application for energy conservation in the end-use sectors. This report contains progress of research on the Alkali Metal Thermal-to-Electric Converter (AMTEC) and on the Two-Phase Liquid-Metal MHD Electrical Generator (LMMHD) for the period January 1, 1991 through December 31, 1991. Research on AMTEC and on LMMHD was initiated during October 1987. Reports prepared on previous occasions (Refs. 1--5) contain descriptive and performance discussions of the following direct conversion concepts: thermoelectric, pyroelectric, thermionic, thermophotovoltaic, thermoacoustic, thermomagnetic, thermoelastic (Nitionol heat engine); and also, more complete descriptive discussions of AMTEC and LMMHD systems.

  5. Site Transition Process Upon Cleanup Completion | Department of Energy

    Energy Savers [EERE]

    Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion PDF icon Site Transition Process Upon Cleanup Completion More Documents & Publications Recommendation 198: Establish a site transition process Recommendation 218: Develop a Fact Sheet on Site Transition at On-going Mission Sites EM SSAB Conference Calls - January 27, 2011

  6. Project Registration Number Assignments (Completed) | Department of Energy

    Energy Savers [EERE]

    Registration Number Assignments (Completed) Project Registration Number Assignments (Completed) As of: March 2016 Provides a table of Project Registration Number Assignments (Completed) PDF icon Project Registration Number Assignments (Completed) More Documents & Publications All Active DOE Technical Standards Document Project Registration Number Assignments (Active) The Proposed Reaffirmations and Cancellations For Additional Information Contact: Jeffrey Feit phone: 301-903-0471 e-mail:

  7. U.S. and Japan Complete Successful Field Trial of Methane Hydrate Production Technologies

    Broader source: Energy.gov [DOE]

    Methane Hydrates May Exceed the Energy Content of All Other Fossil Fuels Combined; Could Ensure Decades of Affordable Natural Gas and Cut America’s Foreign Oil Dependence

  8. Technology Roadmap Analysis 2013: Assessing Automotive Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roadmap Analysis 2013: Assessing Automotive Technology R&D Relevant to DOE Power Electronics Cost Targets Technology Roadmap Analysis 2013: Assessing Automotive Technology R&D ...

  9. National Energy Technology Laboratory Technology Marketing Summaries...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Energy Technology Laboratory Technology Marketing Summaries Here you'll find marketing summaries for technologies available for licensing from the National Energy...

  10. 309 Facility deactivation and decommisioning Criteria Completion Check Lists

    SciTech Connect (OSTI)

    Cornwell, B.C.

    1996-02-01

    To facilitate and track completion of the 309 Facility turnover criteria completion an Applicability Matrix and Criteria Completion Check Lists were prepared. The applicability matrix documents the required turnover criteria for a given area in the facility or scope of work. The applicable criteria is selected for 16 different areas. For each area a completion checklist is provided to document completion of a requirement by WHC and the Environmental Restoration Contractor.

  11. Chris Bergren Director, Environment Compliance & Area Completion Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Deactivation & Decommissioning at SRS Chris Bergren Director, Environment Compliance & Area Completion Projects DOE Office of Environmental Management Robotics Team Visit to SRS Tuesday, December 8, 2015 Tony Long Acting Manager, Area Completion Projects T Area Completion Area Completions Then Now M Area Completion Now Then Now 2 In Situ Decommissioning of the Heavy Water Components Test Reactor (HWCTR) Before Reactor Dome Removal Reactor Vessel Removal Demolition of Dome After 3 K-Area

  12. Evaluation of Smart Gun Technologies preliminary report

    SciTech Connect (OSTI)

    Weiss, D.R.

    1996-01-01

    The Smart Gun Technology Project has a goal to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing {open_quote}smart{close_quote} technologies. Smart technologies are those that can in some manner identify an officer. This report will identify, describe, and grade various technologies as compared to the requirements that were obtained from officers. This report does not make a final recommendation for a smart gun technology, nor does it give the complete design of a smart gun system.

  13. Manufacturing technologies

    SciTech Connect (OSTI)

    1995-09-01

    The Manufacturing Technologies Center is an integral part of Sandia National Laboratories, a multiprogram engineering and science laboratory, operated for the Department of Energy (DOE) with major facilities at Albuquerque, New Mexico, and Livermore, California. Our Center is at the core of Sandia`s Advanced Manufacturing effort which spans the entire product realization process.

  14. Plasma technology

    SciTech Connect (OSTI)

    Herlitz, H.G.

    1986-11-01

    This paper describes the uses of plasma technology for the thermal destruction of hazardous wastes such as PCBs, dioxins, hydrocarbons, military chemicals and biological materials; for metals recovery from steel making dusts. One advantage of the process is that destruction of wastes can be carried out on site. Systems in several countries use the excess thermal energy for district heating.

  15. (Environmental technology)

    SciTech Connect (OSTI)

    Boston, H.L.

    1990-10-12

    The traveler participated in a conference on environmental technology in Paris, sponsored by the US Embassy-Paris, US Environmental Protection Agency (EPA), the French Environmental Ministry, and others. The traveler sat on a panel for environmental aspects of energy technology and made a presentation on the potential contributions of Oak Ridge National Laboratory (ORNL) to a planned French-American Environmental Technologies Institute in Chattanooga, Tennessee, and Evry, France. This institute would provide opportunities for international cooperation on environmental issues and technology transfer related to environmental protection, monitoring, and restoration at US Department of Energy (DOE) facilities. The traveler also attended the Fourth International Conference on Environmental Contamination in Barcelona. Conference topics included environmental chemistry, land disposal of wastes, treatment of toxic wastes, micropollutants, trace organics, artificial radionuclides in the environment, and the use biomonitoring and biosystems for environmental assessment. The traveler presented a paper on The Fate of Radionuclides in Sewage Sludge Applied to Land.'' Those findings corresponded well with results from studies addressing the fate of fallout radionuclides from the Chernobyl nuclear accident. There was an exchange of new information on a number of topics of interest to DOE waste management and environmental restoration needs.

  16. How to Apply - Step 2: Complete and Submit Your Application | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy 2: Complete and Submit Your Application How to Apply - Step 2: Complete and Submit Your Application To submit an application for Office of Energy Efficiency and Renewable Energy(EERE) Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) grant you will need to provide a Letter of Intent (LOI) prior to submitting your full application. Submit a Letter of Intent The U.S. Department of Energy (DOE) requires that you submit an LOI before submitting your

  17. Vertical borehole design and completion practices used to remove methane gas from mineable coalbeds

    SciTech Connect (OSTI)

    Lambert, S.W.; Trevits, M.A.; Steidl, P.F.

    1980-08-01

    Coalbed gas drainage from the surface in advance of mining has long been the goal of researchers in mine safety. Bureau of Mines efforts to achieve this goal started about 1965 with the initiation of an applied research program designed to test drilling, completion, and production techniques for vertical boreholes. Under this program, over 100 boreholes were completed in 16 different coalbeds. The field methods derived from these tests, together with a basic understanding of the coalbed reservoir, represent an available technology applicable to any gas drainage program whether designed primarily for mine safety or for gas recovery, or both.

  18. Vehicle Technologies Office: Graduate Automotive Technology Education

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (GATE) | Department of Energy Education & Workforce Development » Vehicle Technologies Office: Graduate Automotive Technology Education (GATE) Vehicle Technologies Office: Graduate Automotive Technology Education (GATE) DOE established the Graduate Automotive Technology Education (GATE) Centers of Excellence to provide future generations of engineers and scientists with knowledge and skills in advanced automotive technologies. By funding curriculum development and expansion as well as

  19. Department of Energy Completes Demolition of K-33 Building -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Completes Demolition of K-33 Building - Largest Completed Demo Project in Oak Ridge History September 30, 2011 - 12:00pm Addthis Media Contact Ben Williams ...

  20. DOE Completes Cleanup at New York, California Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Completes Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S....

  1. EM Completes Project to Maintain Water Quality of Spent Nuclear...

    Energy Savers [EERE]

    Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site EM Completes Project to Maintain Water Quality of Spent Nuclear Fuel Basin at Idaho Site ...

  2. Completing Salt Waste Processing Facility is an EM Priority and...

    Office of Environmental Management (EM)

    Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup Progress Completing Salt Waste Processing Facility is an EM Priority and Key to SRS Cleanup ...

  3. NMSLO Affidavit of Completion of ROW Construction | Open Energy...

    Open Energy Info (EERE)

    NMSLO Affidavit of Completion of ROW Construction Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Affidavit of Completion of...

  4. "TRU" Success: SRS Recovery Act Prepares to Complete Shipment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP "TRU" Success: SRS Recovery Act Prepares to Complete Shipment ...

  5. Project Reach Completes Photographic Work in Room 7, Panel 7

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 5, 2015 Project Reach Completes Photographic Work in Room 7, Panel 7 Photographic work in support of the Accident Investigation Board (AIB) has been completed in Room 7...

  6. Residential sector end-use forecasting with EPRI-Reeps 2.1: Summary input assumptions and results

    SciTech Connect (OSTI)

    Koomey, J.G.; Brown, R.E.; Richey, R.

    1995-12-01

    This paper describes current and projected future energy use by end-use and fuel for the U.S. residential sector, and assesses which end-uses are growing most rapidly over time. The inputs to this forecast are based on a multi-year data compilation effort funded by the U.S. Department of Energy. We use the Electric Power Research Institute`s (EPRI`s) REEPS model, as reconfigured to reflect the latest end-use technology data. Residential primary energy use is expected to grow 0.3% per year between 1995 and 2010, while electricity demand is projected to grow at about 0.7% per year over this period. The number of households is expected to grow at about 0.8% per year, which implies that the overall primary energy intensity per household of the residential sector is declining, and the electricity intensity per household is remaining roughly constant over the forecast period. These relatively low growth rates are dependent on the assumed growth rate for miscellaneous electricity, which is the single largest contributor to demand growth in many recent forecasts.

  7. Subcontractors complete recovery act-funded demolition under budget

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery act-funded demolition complete Small business subcontractors complete recovery act-funded demolition under budget Demolition completed $16 million under budget and six months ahead of schedule. April 3, 2012 Recovery Act-funded demolitions complete The Department of Energy's Office of Environmental Management allocated $212 million in Recovery Act funding to Los Alamos. Some $73 million was slated for demolition. Through cost efficiencies, the Lab added two buildings to the demolition

  8. Richland Operations Office Completes Cleanup in Hanford's 300 Area North

    Office of Environmental Management (EM)

    Section | Department of Energy Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north

  9. Definition of Environmental Management (EM) Completion | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2) the specific activities that need to be accomplished before the Office of Environmental Management's (EM) responsibility for a site, or portions of a site, is complete. PDF icon

  10. Building Technologies Office Overview

    SciTech Connect (OSTI)

    2013-04-01

    Building Technologies Office Overview Presentation for the 2013 Building Technologies Office's Program Peer Review

  11. Apparatus for the concurrent inspection of partially completed welds

    DOE Patents [OSTI]

    Smartt, Herschel B.; Johnson, John A.; Larsen, Eric D.; Bitsoi, Rodney J.; Perrenoud, Ben C.; Miller, Karen S.; Pace, David P.

    2002-01-01

    An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

  12. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Field Offices / Welcome to the NNSA Production Office / NPO News Releases / Security Improvements Project Completed Ahead of Schedule, ... Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million.

  13. Uranium Processing Facility Site Readiness Subproject Completed on Time and

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Field Offices / Welcome to the NNSA Production Office / NPO News Releases / Uranium Processing Facility Site Readiness Subproject Completed ... Uranium Processing Facility Site Readiness Subproject Completed on Time and Under Budget The Uranium Processing Facility (UPF) project celebrates its first major milestone with the completion of site readiness work, delivered on time and under budget.

  14. CompleteProject List.doc | Department of Energy

    Office of Environmental Management (EM)

    CompleteProject List.doc&#0; CompleteProject List.doc&#0; PDF icon CompleteProject List.doc&#0; More Documents & Publications Tribal Energy Program February 2012 Award Project Descriptions CX-008525: Categorical Exclusion Determination 2010 Program Review Meeting

  15. Egypt`s first subsea completion: A Gulf of Suez case history

    SciTech Connect (OSTI)

    El Hawary, A.; Hoffman, J.G.

    1996-06-01

    A case history of the Gulf of Suez Petroleum Co.`s (Gupco) first subsea completion is provided. The first completion was for Well GS 373-2, a previously drilled and tested exploration well located in the south portion of the gulf of Suez. Subsea technology was used to economically justify development of this one-well marginal field, which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low-cost subsea tree was used to capture the resources. In the Gulf of Suez, many fields have been discovered but have not been developed because of low reserves. These marginal projects can have a profound impact on the revenue and shareholder value if an economic method is used to exploit these opportunities. Platform installation was not feasible because of reserve size, hence the well has remained abandoned until recently. This paper presents a summarized look at subsea completion technology. The cost comparison of traditional development methods will be made, given the local cost structure in Egypt. The application of this technology has some limitations and constraints that will be discussed in the paper. Furthermore, the actual field installation of Egypt`s first subsea tree will be summarized. Also included is a discussion on simple remote controls and offshore installation operations.

  16. Innovative clean coal technology (ICCT): demonstration of selective catalytic reduction (SCR) technology for the control of nitrogen oxide (NO{sub x}) emission from high-sulfur, coal-fired boilers - economic evaluation of commercial-scale SCR applications for utility boilers

    SciTech Connect (OSTI)

    Healy, E.C.; Maxwell, J.D.; Hinton, W.S.

    1996-09-01

    This report presents the results of an economic evaluation produced as part of the Innovative Clean Coal Technology project, which demonstrated selective catalytic reduction (SCR) technology for reduction of NO{sub x} emissions from utility boilers burning U.S. high-sulfur coal. The document includes a commercial-scale capital and O&M cost evaluation of SCR technology applied to a new facility, coal-fired boiler utilizing high-sulfur U.S. coal. The base case presented herein determines the total capital requirement, fixed and variable operating costs, and levelized costs for a new 250-MW pulverized coal utility boiler operating with a 60-percent NO{sub x} removal. Sensitivity evaluations are included to demonstrate the variation in cost due to changes in process variables and assumptions. This report also presents the results of a study completed by SCS to determine the cost and technical feasibility of retrofitting SCR technology to selected coal-fired generating units within the Southern electric system.

  17. Technology Name

    Energy Savers [EERE]

    Tech Fact Sheet Site Project & Identifier Tech Stage: Development DE-EM0000598 D&D KM-IT For the deployment of Information Technology for D&D knowledge management Page 1 of 2 Florida International University Florida D&D Knowledge Management Information Tool Challenge Deactivation and decommissioning (D&D) work is a high priority across the DOE Complex. The D&D community associated with the various DOE sites has gained extensive knowledge and experience over the years. To

  18. Technology Name

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tech Fact Sheet Site Project & Identifier Tech Stage: Development DE-EM0000598 D&D KM-IT For the deployment of Information Technology for D&D knowledge management Page 1 of 2 Florida International University Florida D&D Knowledge Management Information Tool Challenge Deactivation and decommissioning (D&D) work is a high priority across the DOE Complex. The D&D community associated with the various DOE sites has gained extensive knowledge and experience over the years. To

  19. TECHNOLOGY TRANSFER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    404-NOV. 1, 2000 TECHNOLOGY TRANSFER COMMERCIALIZATION ACT OF 2000 VerDate 11-MAY-2000 04:52 Nov 16, 2000 Jkt 089139 PO 00000 Frm 00001 Fmt 6579 Sfmt 6579 E:\PUBLAW\PUBL404.106 APPS27 PsN: PUBL404 114 STAT. 1742 PUBLIC LAW 106-404-NOV. 1, 2000 Public Law 106-404 106th Congress An Act To improve the ability of Federal agencies to license federally owned inventions. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, SECTION 1. SHORT

  20. Technology Development Advances EM Cleanup | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development Advances EM Cleanup Technology Development Advances EM Cleanup The unique nature of many of EM's remaining facilities will require a strong and responsive engineering and technology program to improve work and public safety, and reduce costs and environmental impacts while completing the cleanup program. A Ceramic membrane to Recycle Caustic Waste Processing Annual Technology Development Report 2007

  1. NATIONAL ENERGY TECHNOLOGY LABORATORY Technology Transfer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NETL Issues Licenses for its Arc Position Sensing Technology Success Story The U.S. Department of Energy's National Energy Technology Laboratory (NETL) has issued two licenses involving its Arc Position Sensing (APS) technology to KW Associates LLC , an Oregon-based company founded by the technology's inventors. APS technology is a patented, award- winning measurement technology developed for the specialty metals industry to identify arc distribution conditions during arc melting. The unique

  2. NREL: Technology Transfer - Technologies Available for Licensing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technologies Available for Licensing Photo of NREL scientist in the NREL Hydrogen Lab. NREL's scientists and engineers develop award-winning technologies available for licensing. NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing. We have many licensing opportunities for NREL-developed technologies, including our featured LED technologies. To see all our technologies available for licensing,

  3. Distributed Energy Technology Characterization (Desiccant Technologies),

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2004 | Department of Energy Characterization (Desiccant Technologies), January 2004 Distributed Energy Technology Characterization (Desiccant Technologies), January 2004 The purpose of this report is to characterize desiccant technology and applications, and to show how these technologies can be designed to utilize the available thermal energy from a combined heat and power (CHP) system. This technology characterization is intended to provide decision-makers and system developers

  4. High Impact Technology Catalyst: Technology Deployment Strategies |

    Energy Savers [EERE]

    Department of Energy Catalyst: Technology Deployment Strategies High Impact Technology Catalyst: Technology Deployment Strategies The Energy Department released the High Impact Technology Catalyst: Technology Deployment Strategies to serve as an overview of the HIT Catalyst program activities, including a summary of the selection process undertaken to identify, evaluate and prioritize the current HITs, descriptions of the technologies and markets for each HIT, and plans for deployment. PDF

  5. NETL Technologies Recognized for Technology Development, Transfer |

    Office of Environmental Management (EM)

    Department of Energy Recognized for Technology Development, Transfer NETL Technologies Recognized for Technology Development, Transfer October 25, 2013 - 1:31pm Addthis Did you know? The Federal Laboratory Consortium for Technology Transfer is the nationwide network of federal laboratories that provides the forum to develop strategies and opportunities for linking laboratory mission technologies and expertise with the marketplace. In consonance with the Federal Technology Transfer Act of

  6. Habitat Projects Completed within the Asotin Creek Watershed, 1998 Completion Report.

    SciTech Connect (OSTI)

    Johnson, Bradley J.

    1999-11-01

    The Asotin Creek Model Watershed Program (ACMWP) is the primary entity coordinating habitat projects on both private and public lands within the Asotin Creek watershed. The Asotin Creek watershed covers approximately 325 square miles in the Blue Mountains of southeastern Washington. Snake River spring chinook salmon, summer steelhead and bull trout, which are listed under the Endangered Species Act (ESA), are present in the watershed. The ACMWP began coordinating habitat projects in 1995. Approximately two hundred forty-six projects have been implemented through the ACMWP as of 1998. Fifty-nine of these projects were funded in part through Bonneville Power Administration's 1998 Columbia Basin Fish and Wildlife Program. These projects used a variety of methods to enhance and protect watershed conditions. In-stream work for fish habitat included construction of hard structures (e.g. vortex rock weirs), meander reconstruction, placement of large woody debris (LWD) and whole trees and improvements to off-channel rearing habitat; one hundred thirty-nine pools were created with these structures. Three miles of stream benefited from riparian improvements such as fencing, vegetative plantings, and noxious weed control. Two alternative water developments were completed, providing off-stream-watering sources for livestock. 20,500 ft of upland terrace construction, seven sediment basin construction, one hundred eighty-seven acres of grass seeding, eight hundred fifty acres of direct seeding and eighteen sediment basin cleanouts were implemented to reduce sediment production and delivery to streams in the watershed.

  7. Vehicle Technologies Office: 2009 Advanced Vehicle Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technology Analysis and Evaluation Activities and Heavy Vehicle Systems Optimization Program Annual Progress Report Vehicle Technologies Office: 2009 Advanced Vehicle ...

  8. Vehicle Technologies Office: 2008 Advanced Vehicle Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technology Analysis and Evaluation Activities and Heavy Vehicle Systems Optimization Program Annual Progress Report Vehicle Technologies Office: 2008 Advanced Vehicle ...

  9. Distributed Energy Technology Characterization (Desiccant Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    applications, and to show how these technologies can be designed to utilize the available thermal energy from a combined heat and power (CHP) system. This technology...

  10. Method for the concurrent ultrasonic inspection of partially completed welds

    DOE Patents [OSTI]

    Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Miller, Karen S. (Idaho Falls, ID); Smartt, Herschel B. (Idaho Falls, ID); McJunkin, Timothy R. (Idaho Falls, ID)

    2002-01-01

    A method for the concurrent ultrasonic inspection of partially completed welds is disclosed and which includes providing a pair of transducers which are individually positioned on the opposite sides of a partially completed weld to be inspected; moving the transducers along the length of and laterally inwardly and outwardly relative to the partially completed weld; pulsing the respective transducers to produce an ultrasonic signal which passes through or is reflected from the partially completed weld; receiving from the respective transducers ultrasonic signals which pass through or are reflected from the partially completed welds; and analyzing the ultrasonic signal which has passed through or is reflected from the partially completed weld to determine the presence of any weld defects.

  11. Nuclear Science & Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Science & Technology Nuclear Science & Technology1354608000000Nuclear Science & TechnologySome of these resources are LANL-only and will require Remote Access. No...

  12. Princeton Plasma Physics Laboratory achieves milestone, completing first

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    part of heart of fusion experiment | Princeton Plasma Physics Lab Princeton Plasma Physics Laboratory achieves milestone, completing first part of heart of fusion experiment By John Greenwald March 22, 2013 Tweet Widget Google Plus One Share on Facebook The completed first section of the NSTX-U center stack. (Photo by Elle Starkman, PPPL Office of Communications) The completed first section of the NSTX-U center stack. Gallery: Related Images: Engineers and technicians at the U.S. Department

  13. Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Production Sites in Ohio | Department of Energy Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio Secretary Bodman Celebrates Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio January 19, 2007 - 9:59am Addthis Over 1,100 Acres in Fernald, Columbus and Ashtabula Restored CROSBY TOWNSHIP, OH - U.S. Secretary of Energy Samuel W. Bodman today certified that environmental cleanup is complete at three former weapons

  14. Secretary Chu Announces Completion of Critical Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance Standards | Department of Energy Completion of Critical Energy Conservation Appliance Standards Secretary Chu Announces Completion of Critical Energy Conservation Appliance Standards September 1, 2009 - 12:00am Addthis Washington, DC - U.S. Energy Secretary Steven Chu announced today that the Department of Energy has completed energy efficiency standards for a critical group of appliances that will together save up to 1.1 billion metric tons of carbon dioxide once in effect. In

  15. Energy Department Completes Cool Roof Installation on DC Headquarters

    Energy Savers [EERE]

    Building to Save Money by Saving Energy | Department of Energy Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy Energy Department Completes Cool Roof Installation on DC Headquarters Building to Save Money by Saving Energy December 14, 2010 - 12:00am Addthis Washington - Secretary Steven Chu today announced the completion of a new cool roof installation on the Department of Energy's Headquarters West Building. There was no incremental cost to adding

  16. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated March 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Completed Projects Print Text

  17. Energy Department Completes Salt Coolant Material Transfer to Czech

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Republic for Advanced Reactor Research | Department of Energy Completes Salt Coolant Material Transfer to Czech Republic for Advanced Reactor Research Energy Department Completes Salt Coolant Material Transfer to Czech Republic for Advanced Reactor Research May 20, 2013 - 12:52pm Addthis News Media Contact (202) 586-4940 PRAGUE, CZECH REPUBLIC - The U.S. Department of Energy recently joined with the U.S. Embassy in Prague and the Czech Republic's Ministry of Industry and Trade to complete

  18. Multizone subsea completions in the Dai Hung field, Vietnam

    SciTech Connect (OSTI)

    Lay, K.R.

    1996-09-01

    The early production phase of the Dai Hung field development resulted in the drilling and completion of five subsea wells. Because of the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. The downhole completion designs used equipment that was primarily of existing proven design and downhole equipment installation was successfully achieved in a single trip. Ongoing reservoir management will be aided by the use of a subsea wireline system to facilitate data acquisition.

  19. Brief: Multizone subsea completions in the Dai Hung field, Vietnam

    SciTech Connect (OSTI)

    Lay, K.R.

    1996-04-01

    The early production phase of the Dai Hung field development involved drilling and completion of five subsea wells. Owing to the complex nature of the reservoirs, selective multizone completions were installed for effective reservoir data acquisition and reservoir management. Downhole completion designs used equipment that was primarily of existing proven design, and downhole equipment was installed in a single trip. Ongoing reservoir management will be aided by use of a subsea wireline system to facilitate data acquisition.

  20. Security Improvements Project Completed Ahead of Schedule, $20 Million

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Library / Press Releases / Security Improvements Project Completed Ahead of Schedule, ... Security Improvements Project Completed Ahead of Schedule, $20 Million Under Budget Press Release Apr 7, 2014 WASHINGTON, D.C. - The National Nuclear Security Administration's (NNSA) Security Improvements Project (SIP) was recently completed ahead of schedule and approximately $20 million under its original budget of $72 million. SIP upgraded

  1. Uranium Processing Facility Site Readiness Subproject Completed on Time and

    National Nuclear Security Administration (NNSA)

    Under Budget | National Nuclear Security Administration Library / Press Releases / Uranium Processing Facility Site Readiness Subproject Completed ... Uranium Processing Facility Site Readiness Subproject Completed on Time and Under Budget Press Release Mar 13, 2015 Washington D.C.--The Uranium Processing Facility (UPF) project celebrates its first major milestone with the completion of site readiness work, delivered on time and under budget. "UPF is essential to our Nation's uranium

  2. High power laser workover and completion tools and systems

    DOE Patents [OSTI]

    Zediker, Mark S; Rinzler, Charles C; Faircloth, Brian O; Koblick, Yeshaya; Moxley, Joel F

    2014-10-28

    Workover and completion systems, devices and methods for utilizing 10 kW or more laser energy transmitted deep into the earth with the suppression of associated nonlinear phenomena. Systems and devices for the laser workover and completion of a borehole in the earth. These systems and devices can deliver high power laser energy down a deep borehole, while maintaining the high power to perform laser workover and completion operations in such boreholes deep within the earth.

  3. DOE Completes Five Recovery Act Projects | Department of Energy

    Office of Environmental Management (EM)

    Completes Five Recovery Act Projects DOE Completes Five Recovery Act Projects August 18, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - The U.S. Department of Energy's (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act. The projects included the expansion of two landfills at the Oak Ridge Reservation (ORR). The Sanitary Landfill, a designated area for non-hazardous waste, was expanded by 385,000

  4. AMO Announces Successful Completion of Industrial-Scale Combined Heat,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen, and Power System | Department of Energy Announces Successful Completion of Industrial-Scale Combined Heat, Hydrogen, and Power System AMO Announces Successful Completion of Industrial-Scale Combined Heat, Hydrogen, and Power System May 20, 2015 - 9:00am Addthis Photo Courtesy of FuelCell Energy, Danbury, CT Photo Courtesy of FuelCell Energy, Danbury, CT AMO recently joined with FuelCell Energy of Danbury, CT to celebrate the completion of their successful partnership project at

  5. Site Transition Process upon Completion of the Cleanup Mission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, ...

  6. Project Completion/Closeout Guide - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6A, Project CompletionCloseout Guide by Brian Huizenga Functional areas: Program Management, Program Planning and Management, Project Management The guide provides nonmandatory...

  7. NNSA Applauds Y-12 for Completing Potable Water Project Ahead...

    National Nuclear Security Administration (NNSA)

    Applauds Y-12 for Completing Potable Water Project Ahead of Schedule and Under Budget | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

  8. Completed Projects Table 2015-08-21.xlsx

    Office of Environmental Management (EM)

    Completed Projects 2005-Present Approved Actual Soil and Water Remediation Soil and Water Remediation ANLE-0030 a 28 30 2007 2007 Yes Yes Yes Nuclear Facility Deactivation and...

  9. Microsoft Word - Completion of an Evalution of Impact of Loss...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Completion of an Evaluation of the Impact of the Loss of Two Hydrogen and Methane Monitoring Sampling Lines Dear Mr. Bearzi: As required under Permit Condition...

  10. Certification of Completion of Level-2 Milestone 405: Deploy...

    Office of Scientific and Technical Information (OSTI)

    of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2...

  11. completed_td_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission and Distribution All Completed T&D Projects Are Listed Below by Category ... Conceptual EngineeringSocioeconomic Impact Study-Alaska Spur Pipeline ASRC Constructors, ...

  12. Certification of Completion of Level-2 Milestone 405: Deploy...

    Office of Scientific and Technical Information (OSTI)

    Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and ...

  13. Coiled tubing completions: An economic discussion of procedures

    SciTech Connect (OSTI)

    Courville, P.W.; Clark, T.R.

    1995-11-01

    The introduction of 2- to 3 {1/2}-in. coiled tubing (CT) sizes provides economical alternative completion opportunities for both new and existing wells. Smaller diameters of CT can also be incorporated into completion designs on existing tubular completions for rigless workovers. This paper will discuss the evaluation method for CT completions in relatively low bottom-hole pressure wells in a non-hostile environment. It will concentrate on two major methods of artificial lift: (1) the use of electric submersible pumps (ESPs) on new wells or (2) the use of gas lift methods to extend the production life of existing wells.

  14. JOBAID-COMPLETING AN EXTERNAL TRAINING REQUEST (SF-182)

    Broader source: Energy.gov [DOE]

    The purpsoe of this job aid is to guide users through the step-by-step process of completing an external training request form (SF-182).

  15. Major Milestone: PPPL completes first quadrant of the heart of...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    preparations and close teamwork. (Photo by Elle Starkman, PPPL Office of Communications) Mission accomplished: The completed first section of the NSTX-U center stack capped months...

  16. Sandia Energy - SPIDERS Completed Its Phase 1 Operational Demonstratio...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grid Integration News & Events Research & Capabilities SMART Grid Energy Assurance Microgrid SPIDERS Completed Its Phase 1 Operational Demonstration in Late January Previous...

  17. Secretary Bodman Celebrates Clean Up Completion of Three Former...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Up Completion of Three Former Weapons Research and Production Sites in Ohio Secretary Bodman ... CROSBY TOWNSHIP, OH - U.S. Secretary of Energy Samuel W. Bodman today ...

  18. Transition for Pantex and Y-12 Contract Completed | National...

    National Nuclear Security Administration (NNSA)

    Transition for Pantex and Y-12 Contract Completed | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

  19. Raft River Geothermal Exploratory Hole No. 1 (RRGE-1). Completion...

    Open Energy Info (EERE)

    report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Raft River Geothermal Exploratory Hole No. 1 (RRGE-1). Completion report Abstract GEOTHERMAL...

  20. STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN

    Energy Savers [EERE]

    7 (07/03) OMB Control No. 1910-5122 U.S. Department of Energy (DOE) Human Reliability Program (HRP) Alcohol Testing Form (Instructions for completing this form are attached.) STEP 1: TO BE COMPLETED BY ALCOHOL TECHNICIAN A. Employee Name __________________________________________________________________ (Print) First M.I. Last B. Employee ID No. __________________________________________________________ C. Employer Name __________________________________________________________

  1. Fact #805: November 25, 2013 Vehicle Technology Penetration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5: November 25, 2013 Vehicle Technology Penetration Fact #805: November 25, 2013 Vehicle Technology Penetration As new vehicle technologies are introduced into the market their initial and overall adoption rate can vary widely. The figure below shows select technologies and their production share over time since first significant use. Fuel injection was adopted fairly quickly after its introduction nearly 40 years ago and reached 100% of the market share, completely replacing the

  2. Seven Years Since SERP: Successes and Setbacks in Technology Procurement

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Conference: Seven Years Since SERP: Successes and Setbacks in Technology Procurement Citation Details In-Document Search Title: Seven Years Since SERP: Successes and Setbacks in Technology Procurement This paper describes lessons learned from 4 completed and 2 ongoing technology procurement projects PNNL has conducted for DOE's Emerging Technology program. The past seven years have seen a variety of projects designed to aggregate markets for highly efficient

  3. Request for Information: GSA Seeks Innovative Building Technologies |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy GSA Seeks Innovative Building Technologies Request for Information: GSA Seeks Innovative Building Technologies September 26, 2014 - 10:50am Addthis This request for information is closed. GSA's Green Proving Ground has opened its 2015 Request for Information (RFI) seeking information on innovative, transformational green building technologies to measure and validate in select federal buildings. To submit your technology, please complete our RFI by Friday, November 7,

  4. Innovative Hydropower Technology Now Powering an Apple Data Center |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Hydropower Technology Now Powering an Apple Data Center Innovative Hydropower Technology Now Powering an Apple Data Center November 24, 2015 - 9:43am Addthis Innovative Hydropower Technology Now Powering an Apple Data Center Sarah Wagoner Sarah Wagoner Communications Specialist, Wind and Water Power Technologies Office Above: Completed Intake Structure. Water from the irrigation canal is divided in two as it approaches the plant. The existing drop structure (foreground)

  5. Apparatus for the concurrent ultrasonic inspection of partially completed welds

    DOE Patents [OSTI]

    Johnson, John A. (Idaho Falls, ID)

    2000-01-01

    An apparatus for the concurrent nondestructive evaluation of partially completed welds is described and which is used in combination with an automated welder and which includes an ultrasonic signal generator mounted on the welder and which generates an ultrasonic signal which is directed toward one side of the partially completed welds; an ultrasonic signal receiver mounted on the automated welder for detecting ultrasonic signals which are transmitted by the ultrasonic signal generator and which are reflected or diffracted from one side of the partially completed weld or which passes through a given region of the partially completed weld; and an analysis assembly coupled with the ultrasonic signal receiver and which processes the ultrasonic signals received by the ultrasonic signal receiver to identify welding flaws in the partially completed weld.

  6. Benefits to the United States of Increasing Global Uptake of Clean Energy Technologies

    SciTech Connect (OSTI)

    Kline, D.

    2010-07-01

    A previous report describes an opportunity for the United States to take leadership in efforts to transform the global energy system toward clean energy technologies (CET). An accompanying analysis to that report provides estimates of the economic benefits to the United States of such a global transformation on the order of several hundred billion dollars per year by 2050. This report describes the methods and assumptions used in developing those benefit estimates. It begins with a summary of the results of the analysis based on an updated and refined model completed since the publication of the previous report. The framework described can be used to estimate the economic benefits to the U.S. of coordinated global action to increase the uptake of CETs worldwide. Together with a Monte Carlo simulation engine, the framework can be used to develop plausible ranges for benefits, taking into account the large uncertainty in the driving variables and economic parameters. The resulting estimates illustrate that larger global clean energy markets offer significant opportunities to the United States economy.

  7. Vehicle Technologies Office Propulsion Materials Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technologies Office Propulsion Materials Technologies Jerry Gibbs eere.energy.gov 2 | Vehicle Technologies Program Materials Technologies Materials Technologies $35.6 M Lightweight Materials $28.5 M Values are FY15 enacted Propulsion Materials $7.1 M Properties and Manufacturing Multi-Material Enabling Modeling & Computational Mat. Sci. Engine Materials, Cast Al & Fe High Temp Alloys Exhaust Sys. Materials, Low T Catalysts Lightweight Propulsion FY13 Enacted $27.5 M $11.9 M FY14

  8. Advanced Technology Vehicle Lab Benchmarking - Level 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Vehicle Lab Benchmarking - Level 1 2014 U.S. DOE Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting Kevin Stutenberg - Principal Investigator Argonne National Laboratory June 17, 2014 Project ID # VSS030 This presentation does not contain any proprietary, confidential, or otherwise restricted information. Overview  Timeline - Benchmarking at ANL started in 1998 - FY13 & FY14 Completed Testing: * 10 vehicles tested in FY13, 4 in FY14 * Thermal impact

  9. EM to Proceed with Demolition Following Completion of Cascade...

    Broader source: Energy.gov (indexed) [DOE]

    ... The cascade was placed in cold standby status in 2001 in the wake of newer technologies ... shutdown in 2005 as DOE began planning decontamination, decommissioning and site cleanup. ...

  10. Department of Energy Completes Demolition of K-33 Building- Largest Completed Demo Project in Oak Ridge History

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energys Oak Ridge Environmental Management (EM) program recently completed its largest demolition project to date. The removal of K-33, a former gaseous diffusion uranium enrichment facility spanning 32-acres, was completed several months ahead of schedule. The American Recovery and Reinvestment Act funded the $51 million project.

  11. Case studies from Oman for coiled tubing deployed completion techniques

    SciTech Connect (OSTI)

    Taylor, R.W.; Conrad, B.

    1996-09-01

    Although the use of ultra-large coiled tubing to complete wells is relatively new, it is gaining widespread industry application. This paper will detail the equipment necessary to perform an operation of this type and will present information from several case studies in Oman in which an operator has successfully deployed completion equipment on 3-1/2-inch-OD coiled tubing. In addition to a discussion of the equipment required to perform the necessary operations, the trial parameters that were established by this operator will be given. The information presented has been selected to allow an initial evaluation to be made of coiled tubing completions in general and will help to determine whether this method can prove to be less expensive than traditional rig-based completions. The topics presented have been chosen to provide the reader with a thorough understanding of the techniques and preparation needed to execute a coiled tubing completion. The summary of experiences will conclude that this innovative completion technique can be a viable method for completing wells. Although long-term advantages regarding production and well maintenance cannot yet be determined, the operator`s experiences to date have confirmed his initial belief that use of coiled tubing in ultra-large continuous-pipe applications can be cost effective.

  12. Drilling Sideways - A Review of Horizontal Well Technology and Its Domestic Application

    Reports and Publications (EIA)

    1993-01-01

    Focuses primarily on domestic horizontal drilling applications, past and present, and on salient aspects of current and near-future horizontal drilling and completion technology.

  13. 2014 Vehicle Technologies Market Report

    SciTech Connect (OSTI)

    Davis, Stacy Cagle; Diegel, Susan W; Boundy, Robert Gary; Moore, Sheila A

    2015-03-01

    This is the sixth edition of this report, which details the major trends in U.S. light-duty vehicle and medium/heavy truck markets as well as the underlying trends that caused them. This report is supported by the U.S. Department of Energy s (DOE) Vehicle Technologies Office (VTO), and, in accord with its mission, pays special attention to the progress of high-efficiency and alternative-fuel technologies. After opening with a discussion of energy and economics, this report features a section each on the light-duty vehicle and heavy/medium truck markets, and concluding with a section each on technology and policy. The first section on Energy and Economics discusses the role of transportation energy and vehicle markets on a national (and even international) scale. The following section examines Light-Duty Vehicle use, markets, manufacture, and supply chains. The discussion of Medium and Heavy Trucks offers information on truck sales and technologies specific to heavy trucks. The Technology section offers information on alternative fuel vehicles and infrastructure, and the Policy section concludes with information on recent, current, and near-future Federal policies like the Corporate Average Fuel Economy standards. In total, the information contained in this report is intended to communicate a fairly complete understanding of U.S. highway transportation energy through a series of easily digestible tables and figures.

  14. Calabi-Yau metrics for quotients and complete intersections

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Braun, Volker; Brelidze, Tamaz; Douglas, Michael R.; Ovrut, Burt A.

    2008-05-22

    We extend previous computations of Calabi-Yau metrics on projective hypersurfaces to free quotients, complete intersections, and free quotients of complete intersections. In particular, we construct these metrics on generic quintics, four-generation quotients of the quintic, Schoen Calabi-Yau complete intersections and the quotient of a Schoen manifold with Z₃ x Z₃ fundamental group that was previously used to construct a heterotic standard model. Various numerical investigations into the dependence of Donaldson's algorithm on the integration scheme, as well as on the Kähler and complex structure moduli, are also performed.

  15. Inspection apparatus for evaluating a partially completed weld

    DOE Patents [OSTI]

    Smartt, Herschel B. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Johnson, Jonn A. (Idaho Falls, ID)

    2001-01-01

    An inspection apparatus for evaluating a partially completed weld is described and which is utilized in combination with an automated movable welder which moves across a supporting surface, and wherein the inspection apparatus includes a coupling member mounted on the welder; a frame member mounted on the coupling member; an ultrasonic sensor mounted on the frame member and disposed in ultrasonic sound transmitting relation relative to the partially completed weld; and a drive assembly for adjusting the position of the ultrasonic sensor relative to the partially completed weld.

  16. Energy Department Completes K-25 Gaseous Diffusion Building Demolition |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Completes K-25 Gaseous Diffusion Building Demolition Energy Department Completes K-25 Gaseous Diffusion Building Demolition December 19, 2013 - 12:00pm Addthis K-25 Demolition - Oak Ridge 2013 K-25 Demolition - Oak Ridge 2013 Media Contacts Ben Williams, DOE, (865) 574-4912 Wayne McKinney, UCOR, (865) 576-6284 Oak Ridge, Tenn. - Today, the Department of Energy announced that its contractor URS|CH2M Oak Ridge, LLC, or UCOR, has completed demolition of the K-25 gaseous

  17. DOE Completes TRU Waste Cleanup at Bettis | Department of Energy

    Office of Environmental Management (EM)

    TRU Waste Cleanup at Bettis DOE Completes TRU Waste Cleanup at Bettis September 23, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP). BAPL is the 20th site to be completely cleaned of legacy TRU

  18. Egypt`s first remotely controlled subsea completion -- A Gulf of Suez case history

    SciTech Connect (OSTI)

    El Hawary, A.; Hoffman, J.G.

    1995-11-01

    A case history of the Gulf of Suez Petroleum Company`s (GUPCO) first remotely controlled subsea completion is provided. The first completion was for well GS 373-2, a previously drilled and tested exploration well located in the south portion of the Gulf of Suez. Subsea technology was utilized to economically justify development of this one well marginal field which was discovered in 1978. Traditional methods proved to be too costly for development, therefore application of a low cost subsea tree was utilized to capture the resources. In the Gulf of Suez many fields have been discovered by have not been developed due to low reserves. These marginal projects can have a profound impact on the revenue and shareholder value if any economic method is used to exploit these opportunities. Platform installation was not feasible due to reserve size, hence the well has remained abandoned until recently. Capturing the experience of Amoco in the Gulf of Mexico and in the Dutch North Sea, GUPCO was able to build a low cost subsea system which would allow for the economic development of the marginal fields discovered in the past. This paper presents a summarized look at subsea completion technology. The cost comparison of traditional development methods will be made, given the local cost structure in Egypt. The application of this technology has some limitations and constraints which will be discussed in the paper. Furthermore the actual field installation of Egypt`s first remotely controlled subsea tree will be summarized. Also included is a discussion on simple remote controls,and offshore installation operations.

  19. Workers Complete Demolition of Hanford's Historic Plutonium Vaults...

    Office of Environmental Management (EM)

    - 12:00pm Addthis RICHLAND, Wash. - The Richland Operations Office and contractor CH2M HILL Plateau Remediation Company this month completed demolition of a large plutonium vault...

  20. Los Alamos County Completes Abiquiu Hydropower Project, Bringing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico April 21, 2011 - 12:00am Addthis ...

  1. U.S. Geothermal Announces Successful Completion of First Well...

    Open Energy Info (EERE)

    Hot Springs Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Announces Successful Completion of First Well at Neal Hot Springs Abstract...

  2. U.S. Geothermal Completes Second Successful Production Well at...

    Open Energy Info (EERE)

    Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: U.S. Geothermal Completes Second Successful Production Well at Neal Hot Springs Project...

  3. Complete genome sequence of Pedobacter heparinus type strain...

    Office of Scientific and Technical Information (OSTI)

    available data about this species are based on a sole strain that was isolated from dry soil. Here we describe the features of this organism, together with the complete genome...

  4. June 30, 2008: US portion of Large Hadron Collider completed

    Broader source: Energy.gov [DOE]

    June 30, 2008The Department and the National Science Foundation announce that the U.S. contribution to the Large Hadron Collider (LHC) has been completed on budget and ahead of schedule. The LHC,...

  5. Department of Energy Completes Five Recovery Act Projects - Moves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    865-576-0885 OAK RIDGE, Tenn. - The U.S. Department of Energy's (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded...

  6. RRC - Geothermal Production Test Completion or Recompletion Report...

    Open Energy Info (EERE)

    Geothermal Production Test Completion or Recompletion Report and Log Form GT-1 Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RRC - Geothermal Production...

  7. Towards a Design of a Complete Solar Water Splitting System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Towards a Design of a Complete Solar Water Splitting System 1 Feb 2013 BISfuel : A team of Bisfuel researchers led by Devens Gust, Ana Moore and Tom Moore has designed and ...

  8. Property:NEPA Completion Notes | Open Energy Information

    Open Energy Info (EERE)

    eset-345kv-transmission-line-project-north B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 82: Data reviewed for completion Barren Ridge Renewable Transmission + LADWP Project Website:...

  9. DOE Completes Annual Determination of the Adequacy of the Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has...

  10. Workers Complete Demolition at Historic Los Alamos Site

    Broader source: Energy.gov [DOE]

    LOS ALAMOS, N.M. – A team lead by the Environmental Management Los Alamos Field Office recently completed demolition of a building at a historic Los Alamos site.

  11. Flow Distortion Study Completed for the Chesapeake Light Tower...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    With the completion of a flow distortion study, a first stage-gate has been passed in the ... for resource assessment and to support research and development to advance offshore wind ...

  12. U.S. Completes Contribution to World's Most Powerful Particle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Completes Contribution to World's Most Powerful Particle Accelerator June 30, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. contribution to the Large Hadron Collider (LHC) ...

  13. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup

    Broader source: Energy.gov [DOE]

    American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project.

  14. Raft River Geothermal Exploratory Hole No. 2, RRGE-2. Completion...

    Open Energy Info (EERE)

    report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Raft River Geothermal Exploratory Hole No. 2, RRGE-2. Completion report Abstract The Raft...

  15. DOE Completes $17 Million Loan Guarantee for New York Energy...

    Office of Environmental Management (EM)

    17 Million Loan Guarantee for New York Energy Storage System with Recovery Act Funds DOE Completes 17 Million Loan Guarantee for New York Energy Storage System with Recovery Act ...

  16. Second Panel of Disposal Rooms Completed in WIPP Underground

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or both," Gilbert said. In accordance with WIPP's design, Panel 2 is identical in layout to Panel 1. Mining of Panel 1 was a 3-year project completed in 1988. After an 11-year...

  17. Department of Energy Announces Completion of World's Largest...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (NIF) is expected to allow scientists to achieve fusion ignition in the laboratory, obtaining more energy from the target than is provided by the laser. The completion of NIF ...

  18. National Algal Biofuels Technology Roadmap Update Webinar

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy Bioenergy Technologies Office (BETO) Advanced Algal Systems Program is in the process of updating the National Algal Biofuels Technology Roadmap published in 2010. It is the Program’s intention that this update include a thorough review of the scientific research and breakthroughs, novel and emerging technologies, as well as remaining barriers and challenges in the field through assistance from experts in the field. The purpose of this webinar is to provide expert reviewers information on why the Office is completing the update and how to provide input to the Roadmap Update.

  19. New technology, concepts aim at lower costs

    SciTech Connect (OSTI)

    Moritis, G.

    1996-10-07

    New technologies both at the application stage and at the concept stage aim at reducing costs for producing and developing offshore fields. At the center of many of these new technologies are floating production, storage, offloading, and drilling vessels. These vessels are tied to subsea completions that take advantage of smaller and lighter wellheads, and such emerging technologies as subsea multiphase meters and pumps, and subsea separators and boosters. The paper discusses floating production, the inclusion of a drilling/workover rig on the turret of a ship-shaped FPSO, the use of smaller turrets, and subsea systems (wellheads, flowmeters, composite materials).

  20. Warehouse Cleanup Project Completed at DOE's Paducah Site | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Warehouse Cleanup Project Completed at DOE's Paducah Site Warehouse Cleanup Project Completed at DOE's Paducah Site January 27, 2015 - 3:06pm Addthis Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) Herb Tyler, David Cassibry, and Roger Nelson review items for characterization. (Photo by Dylan Nichols, LATA Kentucky) A crane loads a high‐side railcar for transport to a commercial waste disposal facility after

  1. Waste Treatment Facility Passes Federal Inspection, Completes Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone, Begins Startup | Department of Energy Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup April 23, 2012 - 12:00pm Addthis Media Contact Erik Simpson, 208-390-9464 Danielle Miller, 208-526-5709 The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive

  2. Hampton University Scientists Complete Historic Experiment | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists Complete Historic Experiment Two experiments recently completed at the Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility (Jefferson Lab) will put scientists one step closer toward understanding the world we live in. The experiments used Jefferson Lab's high energy accelerator and experimental equipment to produce kaons [pronounced Ka- onz], subatomic particles made of quarks, that have puzzled scientists since their discovery almost 50 years ago. "I am

  3. Governor to Join Jefferson Lab in Celebrating Completion of Accelerator

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrade Construction | Jefferson Lab Governor to Join Jefferson Lab in Celebrating Completion of Accelerator Upgrade Construction CEBAF Race Track This aerial photo shows the outline of the racetrack-shaped CEBAF accelerator at Jefferson Lab in Newport News, Va. NEWPORT NEWS, VA, Sept. 25, 2014 - The Governor of Virginia, Terry McAuliffe, will be the guest speaker at the U.S. Department of Energy's Jefferson Lab on Sept. 26 to commemorate the completion of accelerator and civil construction

  4. Certification of Completion of Level-2 Milestone 405: Deploy

    Office of Scientific and Technical Information (OSTI)

    Next-Generation Data Management and Analysis Environment (Technical Report) | SciTech Connect Technical Report: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment Citation Details In-Document Search Title: Certification of Completion of Level-2 Milestone 405: Deploy Next-Generation Data Management and Analysis Environment This summary report describes data management and visualization activities in the Advanced Simulation and

  5. WIPP Completes State of the Art Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Participants use the new EOC during a recent emergency response drill. The new state-of-the-art EOC improves WIPP's emergency management capabilities. WIPP UPDATE: October 15, 2015 WIPP Completes State of the Art Emergency Operations Center The Waste Isolation Pilot Plant (WIPP) continues to make improvements to the facility's overall emergency response capabilities. Construction was recently completed on a 4,000 square foot, state of the art Emergency Operations Center (EOC). The Skeen-Whitlock

  6. EM's Paducah Site Completes Building Removals | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Paducah Site Completes Building Removals EM's Paducah Site Completes Building Removals June 29, 2015 - 12:00pm Addthis Once the building was down, heavy equipment operators began “top-down” shearing to safely remove the remaining structure. Demolition debris was then downsized and loaded into rail cars for shipment off site. Once the building was down, heavy equipment operators began "top-down" shearing to safely remove the remaining structure. Demolition debris was then

  7. LANL completes excavation of 1940s waste disposal site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL completes excavation LANL completes excavation of 1940s waste disposal site The excavation removed about 43,000 cubic yards of contaminated debris and soil from the six-acre site. September 22, 2011 Workers sample contents of LANL's Material Disposal Area B (MDA-B) before excavation Workers sample contents of LANL's Material Disposal Area B (MDA-B) before excavation. Contact Colleen Curran Communications Office (505) 664-0344 Email LOS ALAMOS, New Mexico, September 22, 2011-Los Alamos

  8. Complete Fuel Combustion for Diesel Engines Resulting in Greatly Reduced

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emissions and Improved Fuel Efficiency | Department of Energy Complete Fuel Combustion for Diesel Engines Resulting in Greatly Reduced Emissions and Improved Fuel Efficiency Complete Fuel Combustion for Diesel Engines Resulting in Greatly Reduced Emissions and Improved Fuel Efficiency An advanced engine design that is 15 percent more efficient than diesel, pollution free, and uses any fuel. PDF icon deer08_zajac.pdf More Documents & Publications Impact of Biodiesel Metals on the

  9. EM's Richland Operations Office Completes Chromium Cleanup along Columbia

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    River | Department of Energy Richland Operations Office Completes Chromium Cleanup along Columbia River EM's Richland Operations Office Completes Chromium Cleanup along Columbia River September 24, 2015 - 12:25pm Addthis The inset photo shows Hanford's D and DR Reactor area during operations in the 1950s, and the larger photo shows how the site looked during final backfill activities earlier this year after a chromium contamination cleanup project. The inset photo shows Hanford's D and DR

  10. Specificity and completion time distributions of biochemical processes

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Journal Article: Specificity and completion time distributions of biochemical processes Citation Details In-Document Search Title: Specificity and completion time distributions of biochemical processes In order to produce specific complex structures from a large set of similar biochemical building blocks, many biochemical systems require high sensitivity to small molecular differences. The first and most common mqdel used to explain this high specificity

  11. Ball State University Completes Nation's Largest Ground-Source Geothermal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    System with Support from Recovery Act | Department of Energy Ball State University Completes Nation's Largest Ground-Source Geothermal System with Support from Recovery Act Ball State University Completes Nation's Largest Ground-Source Geothermal System with Support from Recovery Act March 20, 2012 - 3:31pm Addthis As part of the Obama Administration's all-of-the-above approach to American energy, the Energy Department today congratulated Ball State University for its campus-wide

  12. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Energy Savers [EERE]

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  13. Russian Health Studies Program - Overview of Active and Completed Projects

    Energy Savers [EERE]

    | Department of Energy Overview of Active and Completed Projects Russian Health Studies Program - Overview of Active and Completed Projects How Many Projects Does DOE Sponsor Through This Program? DOE currently sponsors five projects. Of these, four core projects focus on the epidemiology and dosimetry of the Techa River population and the Mayak workers: Project 1.1: Techa River Population Dosimetry; Project 1.2b: Techa River Population Cancer Morbidity and Mortality; Project 2.2: Mayak

  14. Kansas City Completes Innovative Business Incubator | Department of Energy

    Energy Savers [EERE]

    Kansas City Completes Innovative Business Incubator Kansas City Completes Innovative Business Incubator The logo for EnergyWorks KC. The Blue Hills Business Center and Contractor Incubator is now open! This Kansas City, Missouri, center has been a collaborative effort between EnergyWorks KC, Greater Kansas City Local Initiatives Support Corporation, Blue Hills Community Services, and the Green Impact Zone. The partners helped transform this once abandoned building on a brownfield site in the

  15. Brookhaven Lab Completes Decommissioning of Graphite Research Reactor:

    Energy Savers [EERE]

    Reactor core and associated structures successfully removed; waste shipped offsite for disposal | Department of Energy Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal September 1, 2012 - 12:00pm Addthis The

  16. Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup |

    Energy Savers [EERE]

    Department of Energy Demolition Work Progresses Toward Goal of Completing Cleanup Los Alamos Demolition Work Progresses Toward Goal of Completing Cleanup January 14, 2016 - 12:20pm Addthis The sewage treatment facility before demolition. The sewage treatment facility before demolition. Debris from the sewage treatment facility. Debris from the sewage treatment facility. Site of the demolished sewage treatment facility. Site of the demolished sewage treatment facility. The sewage treatment

  17. Summary of Electrolytic Hydrogen Production: Milestone Completion Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Electrolytic Hydrogen Production: Milestone Completion Report Summary of Electrolytic Hydrogen Production: Milestone Completion Report This report provides an overview of the current state of electrolytic hydrogen production techonologies and an economic analysis of the processes and systems available as of December 2003. PDF icon 36734.pdf More Documents & Publications Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis

  18. EM's Office of River Protection Completes Waste Retrieval in Another

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Tank | Department of Energy Office of River Protection Completes Waste Retrieval in Another Hanford Tank EM's Office of River Protection Completes Waste Retrieval in Another Hanford Tank December 29, 2015 - 1:10pm Addthis Cranes remove a sluicer from tank C-102 midway through retrieval to replace it with a new piece of equipment. The sluicer is wrapped in two layers of thick plastic to prevent contamination from entering the environment or harming workers. Cranes remove a sluicer

  19. Idaho Workers Complete Last of Transuranic Waste Transfers Funded by

    Office of Environmental Management (EM)

    Recovery Act | Department of Energy Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste &ndash; each weighing up to 15 tons &ndash; to a facility for repackaging and shipment to a permanent disposal location. As part of a project funded by $90 million

  20. Celebrating the Completion of 1 Million Weatherized American Homes |

    Office of Environmental Management (EM)

    Department of Energy Celebrating the Completion of 1 Million Weatherized American Homes Celebrating the Completion of 1 Million Weatherized American Homes Addthis 1 of 6 David Poindexter with Veterans Green Jobs, puts moisture barrier and insulation into the crawl space of this Lakewood, Colorado, home. This home is part of the Energy Department's Weatherization Assistance Program that supports energy efficiency upgrades to low-income homes in Denver. In addition, the Department's

  1. Complete Set of all Reporting Forms | Department of Energy

    Office of Environmental Management (EM)

    Complete Set of all Reporting Forms Complete Set of all Reporting Forms Federal Register Notice for Agency Information Collection Extension Office spreadsheet icon PROPOSED REVISED FORMS FOR MONTHLY REPORTING File Excel Version of All Reporting Forms.xlsx PDF icon PDF Version of All Reporting Forms More Documents & Publications LNG Exports by Truck out of the U.S. Form CNG Exports by Truck out of the U.S. Form LNG Imports by Truck into the U.S. Form

  2. Program Evaluation: EERE Planned and Completed Evaluations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Evaluation » Information Resources » Program Evaluation: EERE Planned and Completed Evaluations Program Evaluation: EERE Planned and Completed Evaluations This section provides a list of past and planned evaluation reports for the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE). Many of the listed reports are available as downloads. The table below tells you which offices have reports accessible as downloads. A checked box in the table -

  3. Innovative Technologies for Bioenergy Technologies Incubator...

    Broader source: Energy.gov (indexed) [DOE]

    00PM EDT Online The Innovative Technologies for Bioenergy Technologies Incubator 2 FOA Informational Webinar will be held Wednesday, September 2, 1:00 p.m.-2:00 p.m. ET. Standard...

  4. Geothermal Technologies Office - Webmaster | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Office - Webmaster Geothermal Technologies Office - Webmaster

  5. Director Leaving the National Energy Technology Laboratory

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy today announced that Carl O. Bauer is retiring from federal service and leaving the National Energy Technology Laboratory effective February 28, 2010, following a distinguished four-year tenure as the laboratory's director, completing an impressive federal civilian and military career.

  6. Plasma technology directory

    SciTech Connect (OSTI)

    Ward, P.P.; Dybwad, G.L.

    1995-03-01

    The Plasma Technology Directory has two main goals: (1) promote, coordinate, and share plasma technology experience and equipment within the Department of Energy; and (2) facilitate technology transfer to the commercial sector where appropriate. Personnel are averaged first by Laboratory and next by technology area. The technology areas are accelerators, cleaning and etching deposition, diagnostics, and modeling.

  7. Solar Technology Center

    SciTech Connect (OSTI)

    Boehm, Bob

    2011-04-27

    The Department of Energy, Golden Field Office, awarded a grant to the UNLV Research Foundation (UNLVRF) on August 1, 2005 to develop a solar and renewable energy information center. The Solar Technology Center (STC) is to be developed in two phases, with Phase I consisting of all activities necessary to determine feasibility of the project, including design and engineering, identification of land access issues and permitting necessary to determine project viability without permanently disturbing the project site, and completion of a National Environmental Policy Act (NEPA) Environmental Assessment. Phase II is the installation of infrastructure and related structures, which leads to commencement of operations of the STC. The STC is located in the Boulder City designated 3,000-acre Eldorado Valley Energy Zone, approximately 15 miles southwest of downtown Boulder City and fronting on Eldorado Valley Drive. The 33-acre vacant parcel has been leased to the Nevada Test Site Development Corporation (NTSDC) by Boulder City to accommodate a planned facility that will be synergistic with present and planned energy projects in the Zone. The parcel will be developed by the UNLVRF. The NTSDC is the economic development arm of the UNLVRF. UNLVRF will be the entity responsible for overseeing the lease and the development project to assure compliance with the lease stipulations established by Boulder City. The STC will be operated and maintained by University of Nevada, Las Vegas (UNLV) and its Center for Energy Research (UNLV-CER). Land parcels in the Eldorado Valley Energy Zone near the 33-acre lease are committed to the construction and operation of an electrical grid connected solar energy production facility. Other projects supporting renewable and solar technologies have been developed within the energy zone, with several more developments in the horizon.

  8. Clean coal technology programs: program update 2006

    SciTech Connect (OSTI)

    2006-09-15

    The purpose of the Clean Coal Technology Programs: Program Update 2006 is to provide an updated status of the DOE commercial-scale demonstrations of clean coal technologies (CCTs). These demonstrations are performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII) and the Clean Coal Power Initiative (CCPI). Program Update 2006 provides 1) a discussion of the role of clean coal technology demonstrations in improving the nation's energy security and reliability, while protecting the environment using the nation's most abundant energy resource - coal; 2) a summary of the funding and costs of the demonstrations; and 3) an overview of the technologies being demonstrated, with fact sheets for demonstration projects that are active, recently completed, withdrawn or ended, including status as of June 30 2006. 4 apps.

  9. Clean Coal Technology Programs: Program Update 2009

    SciTech Connect (OSTI)

    2009-10-01

    The purpose of the Clean Coal Technology Programs: Program Update 2009 is to provide an updated status of the U.S. Department of Energy (DOE) commercial-scale demonstrations of clean coal technologies (CCT). These demonstrations have been performed under the Clean Coal Technology Demonstration Program (CCTDP), the Power Plant Improvement Initiative (PPII), and the Clean Coal Power Initiative (CCPI). Program Update 2009 provides: (1) a discussion of the role of clean coal technology demonstrations in improving the nation’s energy security and reliability, while protecting the environment using the nation’s most abundant energy resource—coal; (2) a summary of the funding and costs of the demonstrations; and (3) an overview of the technologies being demonstrated, along with fact sheets for projects that are active, recently completed, or recently discontinued.

  10. Department of Energy Completes Five Recovery Act Projects- Moves Closer to Completing Recovery Act Funded Work at Oak Ridge Site

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. - The U.S. Department of Energy’s (DOE) Environmental Management (EM) program recently completed five projects at the Oak Ridge site funded through the American Recovery and Reinvestment Act.

  11. HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY

    SciTech Connect (OSTI)

    M.A. Ebadian

    1999-06-30

    To enhance the measurement capability of EICs to alpha spectrometry, measurements at FIU-HCET were performed on different energy alpha sources, and response factors of ST electrets in 960-mL chamber were determined. Earlier, EIC was considered as only a charge-integrating device without spectrometric capability. This is a potentially significant development accomplished by FIU-HCET. It could appreciably lower the current cost of spectral characterization. FIU-HCET has been invited to participate in the Operating Engineers' National Hazmat program's assessment of the Mini Mitter, commercially known as the VitalSense{trademark} Telemetric Monitoring System. This evaluation is scheduled for early July 1999. Additional health and safety technology evaluations, in which FIU-HCET will also participate, are also scheduled for later in the summer. The Technology Information System (TIS), MISD, and DASD are now complete and accessible through the Internet website http://www.DandD.org/tis.

  12. Forest products technologies

    SciTech Connect (OSTI)

    None, None

    2006-07-18

    Report highlights DOE Industrial Technology Program co-funded R&D resulting in commercial energy-efficient technologies and emerging technologies helping the forest products industry save energy.

  13. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roland Risser Director, Building Technologies Office Building Technologies Office Energy Efficiency Starts Here. 2 Building Technologies Office Integrated Approach: Improving Building Performance Research & Development Developing High Impact Technologies Standards & Codes Locking in the Savings Market Stimulation Accelerating Tech-to- Market 3 Building Technologies Office Goal: Reduce building energy use by 50% (compared to a 2010 baseline) 4 Building Technologies Office Working to

  14. Subjective surfaces: a geometric model for boundary completion

    SciTech Connect (OSTI)

    Sarti, Alessandro; Malladi, Ravi; Sethian, J.A.

    2000-06-01

    We present a geometric model and a computational method for segmentation of images with missing boundaries. In many situations, the human visual system fills in missing gaps in edges and boundaries, building and completing information that is not present. Boundary completion presents a considerable challenge in computer vision, since most algorithms attempt to exploit existing data. A large body of work concerns completion models, which postulate how to construct missing data; these models are often trained and specific to particular images. In this paper, we take the following, alternative perspective: we consider a reference point within an image as given, and then develop an algorithm which tries to build missing information on the basis of the given point of view and the available information as boundary data to the algorithm. Starting from this point of view, a surface is constructed. It is then evolved with the mean curvature flow in the metric induced by the image until a piecewise constant solution is reached. We test the computational model on modal completion, amodal completion, texture, photo and medical images. We extend the geometric model and the algorithm to 3D in order to extract shapes from low signal/noise ratio medical volumes. Results in 3D echocardiography and 3D fetal echography are presented.

  15. Monumental effort: How a dedicated team completed a massive beam...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    be adjusted. To align the beam, engineers used measurements to derive a bull's-eye on the inside of the vessel; technicians then used laser technology to zero in on the target. The...

  16. AMO Announces Successful Completion of Industrial-Scale Combined...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "The operation of this tri-gen fuel cell system creates a manufacturing platform for more ... said Mark Johnson, AMO Director. "The tri-gen technology demonstrates efficient power and ...

  17. How to Apply – Step 1: Complete the Registration Process

    Broader source: Energy.gov [DOE]

    This table outlines the various registrations you need, and when you need them, to successfully prepare for the Office of Energy Efficiency and Renewable Energy Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) grant process.

  18. TECHNOLOGY READINESS ASSESSMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOENETL-20151710 U.S. Department of Energy 2014 TECHNOLOGY READINESS ASSESSMENT-CLEAN COAL RESEARCH PROGRAM 2 2014 TECHNOLOGY READINESS ASSESSMENT-CLEAN COAL RESEARCH PROGRAM ...

  19. Geothermal Technologies Office: Publications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Geothermal Technologies Office Details Bookmark & Share View Related Welcome to the Energy Department's Geothermal Technologies Office Publication and Product Library. Here...

  20. Technology Selection Process

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    technologies, including Technical Advisory Groups and the Energy Efficiency Technology Roadmap. Technical Advisory Groups E3T engages stakeholders of electric power industries in...

  1. Hydropower Program Technology Overview

    SciTech Connect (OSTI)

    Not Available

    2001-10-01

    New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

  2. Green Purchasing & Green Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Purchasing & Technology Goals 6 & 7: Green Purchasing & Green Technology Our goal is to purchase and use environmentally sustainable products whenever possible and to implement...

  3. Promising Technologies List

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    about promising new and underutilized energy-saving technologies available for Federal and commercial building sector deployment. To identify promising technologies,...

  4. NREL: Technology Transfer - Contacts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    you may have about NREL's technology transfer opportunities. Partnering with NREL Anne Miller, 303-384-7353 Licensing NREL Technologies Eric Payne, 303-275-3166 Printable Version...

  5. Science and Technology Day

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science and Technology Day Science and Technology Day February 24, 2015 Tuesday, Feb. 24 Berkeley Lab Building 50 Auditorium Attendance is open to anyone. Remote streaming is...

  6. Vehicle Technologies Office: News

    Broader source: Energy.gov [DOE]

    EERE intends to issue, on behalf of its Fuel Cell Technologies Office, a Funding Opportunity Announcement (FOA) entitled "Fuel Cell Technologies Incubator: Innovations in Fuel Cell and Hydrogen...

  7. TECHNOLOGY READINESS ASSESSMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pathway for readying the next generation of affordable clean energy technology -Carbon ... developed to be applicable to nuclear-fuel- waste technology, provides a ...

  8. Complete genome sequence of Cellulomonas flavigena type strain (134T)

    SciTech Connect (OSTI)

    Abt, Birte; Foster, Brian; Lapidus, Alla L.; Clum, Alicia; Sun, Hui; Pukall, Rudiger; Lucas, Susan; Glavina Del Rio, Tijana; Nolan, Matt; Tice, Hope; Cheng, Jan-Fang; Pitluck, Sam; Liolios, Konstantinos; Ivanova, N; Mavromatis, K; Ovchinnikova, Galina; Pati, Amrita; Goodwin, Lynne A.; Chen, Amy; Palaniappan, Krishna; Land, Miriam L; Hauser, Loren John; Chang, Yun-Juan; Jeffries, Cynthia; Rohde, Manfred; Goker, Markus; Woyke, Tanja; Bristow, James; Eisen, Jonathan; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C; Klenk, Hans-Peter

    2010-01-01

    Cellulomonas flavigena (Kellerman and McBeth 1912) Bergey et al. 1923 is the type species of the genus Cellulomonas of the actinobacterial family Cellulomonadaceae. Members of the genus Cellulomonas are of special interest for their ability to degrade cellulose and hemicellulose, particularly with regard to the use of biomass as an alternative energy source. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of a member of the genus Cellulomonas, and next to the human pathogen Tropheryma whipplei the second complete genome sequence within the actinobacterial family Cellulomonadaceae. The 4,123,179 bp long single replicon genome with its 3,735 protein-coding and 53 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  9. EA-1440-S-I: Mitigation Action Plan Completion Report

    Broader source: Energy.gov [DOE]

    This report presents the U.S. Department of Energy’s completion of the May 2008 Mitigation Action Plan (MAP) for the Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory’s South Table Mountain Complex (DOE/EA-1440-S-I) . Since May 2008, DOE and the National Renewable Energy Laboratory (NREL) have implemented various traffic mitigation measures and routinely monitored traffic at the NREL South Table Mountain (STM) campus in Golden, Colorado in accordance with the MAP. With the completion and occupancy of the new Research Support Facility (RSF) and Energy Systems Integration Facility (ESIF) and with offsite traffic impacts maintained below threshold levels, implementation of the MAP is hereby complete. NREL and DOE will continue to implement current traffic control measures and conduct informal traffic monitoring as part of standard operations and sustainability initiatives.

  10. Complete genome sequence of Gordonia bronchialis type strain (3410T)

    SciTech Connect (OSTI)

    Ivanova, N; Sikorski, Johannes; Jando, Marlen; Lapidus, Alla L.; Nolan, Matt; Glavina Del Rio, Tijana; Tice, Hope; Copeland, A; Cheng, Jan-Fang; Chen, Feng; Bruce, David; Goodwin, Lynne A.; Pitluck, Sam; Mavromatis, K; Ovchinnikova, Galina; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Land, Miriam L; Hauser, Loren John; Chang, Yun-Juan; Jeffries, Cynthia; Chain, Patrick S. G.; Saunders, Elizabeth H; Han, Cliff; Detter, J C; Brettin, Thomas S; Rohde, Manfred; Goker, Markus; Bristow, James; Eisen, Jonathan; Markowitz, Victor; Hugenholtz, Philip; Klenk, Hans-Peter; Kyrpides, Nikos C

    2010-01-01

    Gordonia bronchialis Tsukamura 1971 is the type species of the genus. G. bronchialis is a human-pathogenic organism that has been isolated from a large variety of human tissues. Here we describe the features of this organism, together with the complete genome sequence and annotation. This is the first completed genome sequence of the family Gordoniaceae. The 5,290,012 bp long genome with its 4,944 protein-coding and 55 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  11.  Westinghouse Completes its AP1000 Test Stand

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

     Westinghouse Completes its AP1000 Test Stand  VERA-CS Coupled Multi-physics Capability demonstrated in a Full-core Simulation  TVA provides Watts Bar Operating Data to Support Validation of CASL Tools  University of Michigan adds Depletion Capability to MPACT for VERA-CS  VERA Data Transfer Processes Provided by DTK  Alternate Coupling Algorithm Investigations Completed  Role of HPC in the Nuclear Power Industry  TVA Test Stand Launched November 2013 Volume 1, Issue 4

  12. Complete genome sequence of Acidimicrobium ferrooxidans type strain (ICPT)

    SciTech Connect (OSTI)

    Clum, Alicia; Nolan, Matt; Lang, Elke; Glavina Del Rio, Tijana; Tice, Hope; Copeland, Alex; Cheng, Jan-Fang; Lucas, Susan; Chen, Feng; Bruce, David; Goodwin, Lynne; Pitluck, Sam; Ivanova, Natalia; Mavrommatis, Konstantinos; Mikhailova, Natalia; Pati, Amrita; Chen, Amy; Palaniappan, Krishna; Goker, Markus; Spring, Stefan; Land, Miriam; Hauser, Loren; Chang, Yun-Juan; Jefferies, Cynthia C.; Chain, Patrick; Bristow, James; Eisen, Jonathan A.; Markowitz, Victor; Hugenholtz, Philip; Kyrpides, Nikos C.; Klenk, Hans-Peter; Lapidus, Alla

    2009-05-20

    Acidimicrobium ferrooxidans (Clark and Norris 1996) is the sole and type species of the genus, which until recently was the only genus within the actinobacterial family Acidimicrobiaceae and in the order Acidomicrobiales. Rapid oxidation of iron pyrite during autotrophic growth in the absence of an enhanced CO2 concentration is characteristic for A. ferrooxidans. Here we describe the features of this organism, together with the complete genome sequence, and annotation. This is the first complete genome sequence of the order Acidomicrobiales, and the 2,158,157 bp long single replicon genome with its 2038 protein coding and 54 RNA genes is part of the Genomic Encyclopedia of Bacteria and Archaea project.

  13. 2010sr27[cooling_tower_complete].doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Friday, September 17, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 952-6938 paivi.nettamo@srs.gov K Cooling Tower Project Reaches Completion Aiken, S.C. - One of the most visual milestones of cleanup projects underway within the Department of Energy's Office of Environmental Management was the demolition of the K-Reactor Cooling Tower at the Savannah River Site (SRS). Now, this American Recovery and Reinvestment Act project has been completed one month ahead of schedule, with debris

  14. LANL completes excavation of 1940s waste disposal site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Excavation of waste disposal site completed LANL completes excavation of 1940s waste disposal site The excavation removed about 43,000 cubic yards of contaminated debris and soil from the six-acre site. September 30, 2011 Material Disposal Area B Material Disposal Area B, the Lab's oldest waste disposal site, was excavated inside sturdy metal enclosures.There was no open air excavation at MDA-B. Contact Small Business Office (505) 667-4419 Email "Safety for the public, the environment, and

  15. Idaho Cleanup Project grows its workforce to complete ARRA work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls. Over a hundred new faces have already joined the Idaho Cleanup Project (ICP) workforce, both in offices and at work sites across DOE's Idaho Site. The ICP is ramping up its workforce to complete new work scope assigned to the ICP under the American Recovery and Reinvestment Act (ARRA). As of June 27, 143 new workers have

  16. Idaho Site Completes Cleanup Milestone Ahead of Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Media Contact: Erik Simpson (208) 360-0426 For Immediate Release Date: June 23, 2010 Idaho Site Completes Cleanup Milestone Ahead of Schedule Idaho Falls, ID � The Department of Energy�s Idaho Operations Office, through the efforts of its cleanup contractor, CH2M-WG Idaho (CWI), recently reached a key cleanup milestone three weeks ahead of schedule by completing the transfer of nearly 6.6 metric tons of spent nuclear fuel from wet to dry storage. �The transfer of spent nuclear fuel

  17. F Reactor Area Cleanup Complete | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete September 19, 2012 - 12:00pm Addthis Media Contact Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractors have cleaned up the F Reactor Area, the first reactor area at the Hanford Site in southeastern Washington state to be fully remediated. While six of Hanford's nine plutonium production reactors have been sealed up, or cocooned, the F Reactor Area is the first to

  18. K-25 West Wing Demolition Completed | Department of Energy

    Energy Savers [EERE]

    West Wing Demolition Completed K-25 West Wing Demolition Completed January 28, 2010 - 12:00pm Addthis OAK RIDGE, Tenn. - Thirteen months after demolition began, the final unit of the K-25 Building West Wing was taken down on January 20. Demolition of the 844,000 square foot structure began on December 16, 2008. A significant amount of debris remains to be size-reduced and shipped to the Environmental Management Waste Management Facility (EMWMF) in Oak Ridge, but demolition of the wing is

  19. Celebrating the Completion of the World's Largest Concentrating Solar Power

    Energy Savers [EERE]

    Plant | Department of Energy the Completion of the World's Largest Concentrating Solar Power Plant Celebrating the Completion of the World's Largest Concentrating Solar Power Plant February 13, 2014 - 9:21am Addthis Aerial view, Ivanpah 1 of 5 Aerial view, Ivanpah An aerial view of the Ivanpah Solar Power Facility at sunrise, with left to right Tower 1, 2 and 3. Image: Gilles Mingasson/Getty Images for Bechtel Harnessing the Power of the Sun 2 of 5 Harnessing the Power of the Sun The top of

  20. Hanford Site Prepares for Completion of Plutonium Finishing Plant

    Energy Savers [EERE]

    Demolition | Department of Energy Prepares for Completion of Plutonium Finishing Plant Demolition Hanford Site Prepares for Completion of Plutonium Finishing Plant Demolition January 14, 2016 - 12:15pm Addthis Employees cut apart a two-stories-high glove box from the top down so they can remove the structure piece by piece from the facility. Employees cut apart a two-stories-high glove box from the top down so they can remove the structure piece by piece from the facility. The GrayQb hangs

  1. Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces

    Office of Environmental Management (EM)

    the Risk along the Columbia River | Department of Energy Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River September 13, 2012 - 12:00pm Addthis Media Contacts Cameron Salony, DOE Cameron.Salony@rl.doe.gov 509-376-0402 Dee Millikin, CH2M HILL Plateau Remediation Company Dee_Millikin@rl.gov 509-376-1297 RICHLAND, WASH. - The

  2. DOE, Washington Closure complete recycling project at Hanford | Department

    Office of Environmental Management (EM)

    of Energy DOE, Washington Closure complete recycling project at Hanford DOE, Washington Closure complete recycling project at Hanford October 28, 2014 - 4:00pm Addthis Media Contacts Cameron Hardy, DOE, 509-376-5365, Cameron.Hardy@rl.doe.gov Peter Bengtson, Washington Closure Hanford, 509-372-9031, Peter.Bengtson@wch-rcc.com About $400,000 saved by recycling electrical substation components in 300 Area RICHLAND, Wash. - The U.S. Department of Energy (DOE) recently teamed with contractor

  3. EM's Los Alamos Site Completes Canyon-Side Cleanup of

    Office of Environmental Management (EM)

    Mercury-Contaminated Soil | Department of Energy Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil EM's Los Alamos Site Completes Canyon-Side Cleanup of Mercury-Contaminated Soil July 28, 2015 - 12:00pm Addthis A spider excavator extracts mercury-contaminated soil. A spider excavator extracts mercury-contaminated soil. Workers position a crane above the project site. Workers position a crane above the project site. A waste container is loaded for off-site disposal. A

  4. Technology Readiness Assessment (TRA)/Technology Maturation Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This...

  5. DOE Vehicle Technologies Program 2009 Merit Review Report - Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Integration and Education DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Integration and Education Merit review of DOE Vehicle Technologies...

  6. Blue Spark Technologies formerly Thin Battery Technologies Inc...

    Open Energy Info (EERE)

    Spark Technologies formerly Thin Battery Technologies Inc Jump to: navigation, search Name: Blue Spark Technologies (formerly Thin Battery Technologies Inc.) Place: Westlake, Ohio...

  7. Sun Materials Technology aka Shanyang Technology | Open Energy...

    Open Energy Info (EERE)

    Technology aka Shanyang Technology Jump to: navigation, search Name: Sun Materials Technology (aka Shanyang Technology) Place: Yilan County, Taiwan Product: A US-Taiwan JV company...

  8. GT Solar Technologies formerly GT Equipment Technologies | Open...

    Open Energy Info (EERE)

    Technologies formerly GT Equipment Technologies Jump to: navigation, search Name: GT Solar Technologies (formerly GT Equipment Technologies) Place: Merrimack, New Hampshire...

  9. Quantum Fuel Systems Technologies Worldwide Inc Quantum Technologies...

    Open Energy Info (EERE)

    Fuel Systems Technologies Worldwide Inc Quantum Technologies Jump to: navigation, search Name: Quantum Fuel Systems Technologies Worldwide Inc (Quantum Technologies) Place: Irvine,...

  10. Completing Pre-Pilot Tasks To Scale Up Biomass Fractionation Pretreatment Apparatus From Batch To Continuous

    SciTech Connect (OSTI)

    Dick Wingerson

    2004-12-15

    PureVision Technology, Inc. (PureVision) was the recipient of a $200,000 Invention and Innovations (I&I) grant from the U. S. Department of Energy (DOE) to complete prepilot tasks in order to scale up its patented biomass fractionation pretreatment apparatus from batch to continuous processing. The initial goal of the I&I program, as detailed in PureVision's original application to the DOE, was to develop the design criteria to build a small continuous biomass fractionation pilot apparatus utilizing a retrofitted extruder with a novel screw configuration to create multiple reaction zones, separated by dynamic plugs within the reaction chamber that support the continuous counter-flow of liquids and solids at elevated temperature and pressure. Although the ultimate results of this 27-month I&I program exceeded the initial expectations, some of the originally planned tasks were not completed due to a modification of direction in the program. PureVision achieved its primary milestone by establishing the design criteria for a continuous process development unit (PDU). In addition, PureVision was able to complete the procurement, assembly, and initiate shake down of the PDU at Western Research Institute (WRI) in Laramie, WY during August 2003 to February 2004. During the month of March 2004, PureVision and WRI performed initial testing of the continuous PDU at WRI.

  11. NREL: Technology Transfer - Commercialization Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    303-275-3051. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Nondisclosure Agreements...

  12. Long-Term Modeling of Solar Energy: Analysis of Concentrating Solar Power (CSP) and PV Technologies

    SciTech Connect (OSTI)

    Zhang, Yabei; Smith, Steven J.

    2007-08-16

    This report presents an overview of research conducted on solar energy technologies and their implementation in the ObjECTS framework. The topics covered include financing assumptions and selected issues related to the integration of concentrating thermal solar power (CSP) and photovoltaics PV technologies into the electric grid. A review of methodologies for calculating the levelized energy cost of capital-intensive technologies is presented, along with sensitivity tests illustrating how the cost of a solar plant would vary depending on financing assumptions. An analysis of the integration of a hybrid concentrating thermal solar power (CSP) system into the electric system is conducted. Finally a failure statistics analysis for PV plants illustrates the central role of solar irradiance uncertainty in determining PV grid integration characteristics.

  13. Complete genome sequences for the anaerobic, extremely thermophilic plant

    Office of Scientific and Technical Information (OSTI)

    biomass-degrading bacteria Caldicellulosiruptor hydrothermalis, Caldicellulosiruptor kristjanssonii, Caldicellulosiruptor kronotskyensis, Caldicellulosiruptor owensenis, and Caldicellulosiruptor lactoaceticus (Journal Article) | SciTech Connect Complete genome sequences for the anaerobic, extremely thermophilic plant biomass-degrading bacteria Caldicellulosiruptor hydrothermalis, Caldicellulosiruptor kristjanssonii, Caldicellulosiruptor kronotskyensis, Caldicellulosiruptor owensenis, and

  14. Reduce completion fluid costs with on-site brine tests

    SciTech Connect (OSTI)

    Thomas, D.C.; Darlington, R.K.; Kinney, W.R.; Lowell, J.L.

    1982-09-01

    A newly developed field kit makes on-site brine completion fluid testing practical. Simple titration procedures are used to analyze brine for calcium, zinc, chloride and bromide with an accuracy and repeatability that compares favorably with expensive laboratory techniques. This article describes the field testing theory and details analytical procedures used.

  15. Los Alamos National Laboratory completes demolition, recycling of former

    National Nuclear Security Administration (NNSA)

    Administration Building | National Nuclear Security Administration completes demolition, recycling of former Administration Building | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios

  16. NNSA's Asset Management Program Completes First Pilot | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Asset Management Program Completes First Pilot | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo

  17. Sandia completes major overhaul of key nuclear weapons test facilities |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration completes major overhaul of key nuclear weapons test facilities | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets

  18. Y-12 National Security Complex Completes W69 Dismantlement | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration Completes W69 Dismantlement | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery

  19. NNSA Successfully Completes W87 Refurbishment | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Successfully Completes W87 Refurbishment | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs

  20. NNSA, LANL Complete DARHT Improvements With Successful Multi-frame

    National Nuclear Security Administration (NNSA)

    Hydrodynamic Test | National Nuclear Security Administration LANL Complete DARHT Improvements With Successful Multi-frame Hydrodynamic Test | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios

  1. NSC completes last part to facilitate relocation | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration completes last part to facilitate relocation | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo

  2. NSC nears move completion with outstanding safety record | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration nears move completion with outstanding safety record | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases

  3. Nuclear Materials Safeguards and Security Upgrade Project Completed Under

    National Nuclear Security Administration (NNSA)

    Budget | National Nuclear Security Administration Completed Under Budget | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases

  4. Transition for Pantex and Y-12 Contract Completed | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Transition for Pantex and Y-12 Contract Completed | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases

  5. Hydrogen delivery technology roadmap

    SciTech Connect (OSTI)

    None, None

    2005-11-15

    Document describing plan for research into and development of hydrogen delivery technology for transportation applications.

  6. Crosscutting Technology Research FAQs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crosscutting Technology Research FAQs faq-header-big.jpg CROSSCUTTING - BASICS Q: What is the Crosscutting Technology Research Program? A: The Crosscutting Technology Research Program focuses on enabling technologies that foster transformational developments across multiple disciplines to support energy system platforms in power system design, construction, and operation for highly efficient operation and superior environmental performance. By bridging the gap between fundamental research and

  7. Innovative Process Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovative Process Technologies Fact Sheets Research Team Members Key Contacts Innovative Process Technologies Innovative Process Technologies is concerned with the development of innovative costeffective technologies that promote efficiency, environmental performance, availability of advanced energy systems, and the development of computational tools that shorten development timelines of advanced energy systems. NETL, working with members of the NETL-Regional University Alliance (NETL-RUA),

  8. Tracers and Exploration Technologies

    Broader source: Energy.gov [DOE]

    Below are the project presentations and respective peer review results for Tracers and Exploration Technologies.

  9. HEMISPHERIC CENTER FOR ENVIRONMENTAL TECHNOLOGY

    SciTech Connect (OSTI)

    M.A. Ebadian

    2000-01-31

    The Online Measurement of Decontamination project team received a commitment for a demonstration in May from the Sacramento (California) Municipal Utility District (SMUD) Rancho Seco site. Since this site is a member of the DOE Commercial Utilities Consortium, the demonstration will fulfill the DOE and commercial technology demonstration requirements. Discussion on deployment of the Integrated Vertical and Overhead Decontamination (IVOD) System at Rancho Seco was conducted; date for deployment tentatively scheduled for early spring. Based upon fictional requirements from SRS for a shiny monitor in a high-level waste tank, FIU-HCET developed and delivered a draft slurry monitor design and draft test plan. Experiments measuring slurry settling time for SRS slurry simulant at 10 wt% have been completed on FIU-HCET'S flow loop with SRS dip. The completed design package of the test mockup for evaluating Non-Intrusive Location of Buried Items Technologies was sent to Fluor Fernald and the Operating Engineers National Hazmat Program for review. Comments are due at the end of January. Preliminary experiments to determine size distribution of aerosols generated during metal cutting were performed. A 1/4-inch-thick iron plate was cut using a plasma arc torch, and the size distribution of airborne particles was measured using a multistage impactor. Per request of DOE-Ohio, FIU-HCET participated in a weeklong value engineering study for the characterization, decontamination, and dismantlement of their critical path facility.

  10. DOE-Supported Project Advances Clean Coal, Carbon Capture Technology |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Supported Project Advances Clean Coal, Carbon Capture Technology DOE-Supported Project Advances Clean Coal, Carbon Capture Technology January 29, 2013 - 12:00pm Addthis Washington, DC - Researchers at The Ohio State University (OSU) have successfully completed more than 200 hours of continuous operation of their patented Coal-Direct Chemical Looping (CDCL) technology - a one-step process to produce both electric power and high-purity carbon dioxide (CO2). The test, led

  11. Geothermal Technologies Program Multi-Year Research, Development and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration Plan | Department of Energy Multi-Year Research, Development and Demonstration Plan Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025. PDF icon gtp_myrdd_2009-complete.pdf More Documents & Publications

  12. Technology to Market Competitive Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Market Competitive Awards Technology to Market Competitive Awards The SunShot Initiative's Technology to Market subprogram issues competitive solicitations for projects that target two known funding gaps in bringing new technologies to market: those that occur at the prototype commercialization stage, as well as those at the commercial scale-up stage. Financial awards allow recipients to help advance the SunShot Initiative's goal of making solar energy completely cost-competitive with

  13. NATIONAL ENERGY TECHNOLOGY LABORATORY Technology Transfer Novel...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Novel PlatinumChromium Alloy for the Manufacture of Improved Coronary Stents Success Story NETL Technology Transfer Group techtransfer@netl.doe.gov Contact Partners A coronary...

  14. Vehicle Technologies Office: 2014 Electric Drive Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Past year's reports are listed on the Annual Progress Reports page. PDF icon FY14EDTAnnualReport.pdf More Documents & Publications Vehicle Technologies Office: 2013 Advanced ...

  15. NATIONAL ENERGY TECHNOLOGY LABORATORY Technology Transfer NETL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sorbent Technologies Licensed for Use in Biomass-to- Biofuel Conversion Process with ... as part of its spinout MG Fuels' integrated biomass-to-biofuel conversion process. ...

  16. Energy Technology Division Energy Technology Division Energy...

    Office of Scientific and Technical Information (OSTI)

    constitute or imply its endorsement, recommendation, or favoring by the United States ... sensor. 4. Technology, or the basic physical phenomena that the sensor uses to do its job. ...

  17. Analysis of the Effects of Compositional and Configurational Assumptions on Product Costs for the Thermochemical Conversion of Lignocellulosic Biomass to Mixed Alcohols FY 2007 Progress Report

    SciTech Connect (OSTI)

    Zhu, Yunhua; Gerber, Mark A.; Jones, Susanne B.; Stevens, Don J.

    2009-02-01

    The purpose of this study was to examine alternative biomass-to-ethanol conversion process assumptions and configuration options to determine their relative effects on overall process economics. A process-flow-sheet computer model was used to determine the heat and material balance for each configuration that was studied. The heat and material balance was then fed to a costing spreadsheet to determine the impact on the ethanol selling price. By examining a number of operational and configuration alternatives and comparing the results to the base flow sheet, alternatives having the greatest impact the performance and cost of the overall system were identified and used to make decisions on research priorities. This report, which was originally published in December 2008, has been revised primarily to correct information presented in Appendix B -- Base Case Flow Sheets and Model Results. The corrections to Appendix B include replacement of several pages in Table B.1 that duplicated previous pages of the table. Other changes were made in Appendix B to correct inconsistencies between stream labels presented in the tables and the stream labels in the figures.

  18. Materials Science and Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MST Materials Science and Technology Providing world-leading, innovative, and agile materials science and technology solutions for national security missions. MST is metallurgy. The Materials Science and Technology Division provides scientific and technical leadership in materials science and technology for Los Alamos National Laboratory. READ MORE MST is engineered materials. The Materials Science and Technology Division provides scientific and technical leadership in materials science and

  19. Emerging Technologies Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emerging Technologies Program Pat Phelan Program Manager patrick.phelan@ee.doe.gov (202)287-1906 April 2, 2013 Building Technologies Office Program Peer Review 2 | Building Technologies Office eere.energy.gov How ET Fits into BTO Research & Development * Develop technology roadmaps * Prioritize opportunities * Solicit and select innovative technology solutions * Collaborate with researchers * Solve technical barriers and test innovations to prove effectiveness * Measure and validate energy

  20. TECHNOLOGY TRANSFER COORDINATORS

    Broader source: Energy.gov [DOE]

    Mark Hartney, Director of the Office of Strategic Planning, SLAC, discussed technology transfer at SLAC. Bob Hwang, Director, Transportation Energy Center, Combustion Research Facility, SNL presented on technology transfer at SNL. Elsie Quaite-Randall, Chief Technology Transfer Officer, Innovation and Partnerships Office, LBNL, presented on technology transfer at LBNL. Richard A. Rankin, Director, Industrial Partnerships Office and Economic Development Office (Interim), LLNL, presented on technology transfer at LLNL.

  1. New technologies for refrigeration without CFCs

    SciTech Connect (OSTI)

    Swift, G.W.

    1992-09-01

    Today the appliance industry and other cooling industries are facing the double challenge of eliminating environmentally harmful CFCs while simultaneously improving energy efficiency. These challenges will force this industry to make tremendous changes and to work out many difficult problems, ranging from choice of technology through production-line retooling to product-liability concerns. Three new cooling technologies--sonic compression, thermoacoustic refrigeration, and Malone refrigeration--have been developed at least in part at Los Alamos National Laboratory. We will discuss the principles, features, and status of each of these three technologies. With these three examples we hope to show that mechanical compression and subsequent evaporation of CFCs is not the only potentially practical way to produce cooling. These examples are only three of many alternative cooling technologies. No new technology can be guaranteed a success before development is complete, from either an economic or engineering point of view. But enough alternative cooling technologies exist, and the probability for success of each technology is high enough, that one or more of these technologies can almost certainly be produced at reasonable cost, eliminate CFCS, and reduce the consumption of electricity.

  2. Technology Assessment Tool - An Application of Systems Engineering to USDOE Technology Proposals

    SciTech Connect (OSTI)

    Rynearson, Michael Ardel

    1999-06-01

    This paper discusses the system design for a Technology Assessment (TA) tool that can be used to quantitatively evaluate new and advanced technologies, products, or processes. Key features of the tool include organization of information in an indentured hierarchy; questions and categories derived from the decomposition of technology performance; segregation of life-cycle issues into six assessment categories; and scoring, relative impact, and sensitivity analysis capability. An advantage of the tool's use is its ability to provide decision analysis data, based on incomplete or complete data.

  3. Windows technology assessment

    SciTech Connect (OSTI)

    Baron, J.J.

    1995-10-01

    This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

  4. Introduction to Cyber Technologies exercise environment

    Energy Science and Technology Software Center (OSTI)

    2014-12-17

    Exercise environment for Introduction to Cyber Technologies class. This software is essentially a collection of short scripts, configuration files, and small executables that form the exercise component of the Sandia Cyber Technologies Academy’s Introduction to Cyber Technologies class. It builds upon other open-source technologies, such as Debian Linux and minimega, to provide comprehensive Linux and networking exercises that make learning these topics exciting and fun. Sample exercises: a pre-built set of home directories the studentmore » must navigate through to learn about privilege escalation, the creation of a virtual network playground designed to teach the student about the resiliency of the Internet, and a two-hour Capture the Flag challenge for the final lesson. There are approximately thirty (30) exercises included for the students to complete as part of the course.« less

  5. Introduction to Cyber Technologies exercise environment

    SciTech Connect (OSTI)

    2014-12-17

    Exercise environment for Introduction to Cyber Technologies class. This software is essentially a collection of short scripts, configuration files, and small executables that form the exercise component of the Sandia Cyber Technologies Academy?s Introduction to Cyber Technologies class. It builds upon other open-source technologies, such as Debian Linux and minimega, to provide comprehensive Linux and networking exercises that make learning these topics exciting and fun. Sample exercises: a pre-built set of home directories the student must navigate through to learn about privilege escalation, the creation of a virtual network playground designed to teach the student about the resiliency of the Internet, and a two-hour Capture the Flag challenge for the final lesson. There are approximately thirty (30) exercises included for the students to complete as part of the course.

  6. 2010 DOE EERE Vehicle Technologies Program Merit Review … Technology

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integration | Department of Energy … Technology Integration 2010 DOE EERE Vehicle Technologies Program Merit Review … Technology Integration Technology integration merit review results PDF icon 2010_amr_08.pdf More Documents & Publications 2012 Annual Merit Review Results Report - Technology Integration 2011 Annual Merit Review Results Report - Technology Integration DOE Vehicle Technologies Program 2009 Merit Review Report - Technology Integration and Education

  7. SHARED TECHNOLOGY TRANSFER PROGRAM

    SciTech Connect (OSTI)

    GRIFFIN, JOHN M. HAUT, RICHARD C.

    2008-03-07

    The program established a collaborative process with domestic industries for the purpose of sharing Navy-developed technology. Private sector businesses were educated so as to increase their awareness of the vast amount of technologies that are available, with an initial focus on technology applications that are related to the Hydrogen, Fuel Cells and Infrastructure Technologies (Hydrogen) Program of the U.S. Department of Energy. Specifically, the project worked to increase industry awareness of the vast technology resources available to them that have been developed with taxpayer funding. NAVSEA-Carderock and the Houston Advanced Research Center teamed with Nicholls State University to catalog NAVSEA-Carderock unclassified technologies, rated the level of readiness of the technologies and established a web based catalog of the technologies. In particular, the catalog contains technology descriptions, including testing summaries and overviews of related presentations.

  8. Unmanned Aircraft Test Flights Completed at Oliktok Point

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Flights Completed at Oliktok Point - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management

  9. Waste treatment facility passes federal inspection, completes final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    milestone, begins startup 23, 2012 Media Contact: Danielle Miller, 208-526-5709 Erik Simpson, 208-390-9464 Waste treatment facility passes federal inspection, completes final milestone, begins startup The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. An exterior view of the

  10. Environmental Remediation program completes legacy mercury cleanup near

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Smith's Marketplace Stories » Legacy slope-side cleanup Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace Los Alamos National Laboratory performed a high-angle canyon-side cleanup on U.S. Department of Energy property just south of Smith's Marketplace. May 1, 2015 A telescoping crane hoists a spider excavator over Los Alamos Canyon before placing it on the canyon slope to excavate historically contaminated soil. In ongoing efforts to reduce the

  11. Jefferson Lab accelerator upgrade completed: Initial operations set to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begin while experimental equipment upgrades continue | Jefferson Lab Jefferson Lab accelerator upgrade completed: Initial operations set to begin while experimental equipment upgrades continue areial Aerial of Jefferson Lab NEWPORT NEWS, VA, August 12, 2014 - The Department of Energy's Thomas Jefferson National Accelerator Facility ("Jefferson Lab") has just received formal approval from DOE to begin initial operations of the Continuous Electron Beam Accelerator Facility (CEBAF) as

  12. Oak Ridge Environmental Management Program Completes Work at Bethel Valley

    Broader source: Energy.gov (indexed) [DOE]

    Burial Grounds | Department of Energy Media Contact Ben Williams http://www.oakridge.doe.gov 865-576-0885 OAK RIDGE, Tenn. - The U.S. Department of Energy's (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds. Oak Ridge's EM program was able to use Recovery Act funds to address five areas needing improvement, including

  13. Pantex Wind Farm Complete | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Wind Farm Complete | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA

  14. Science and Technology 2009 | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology 2009 July 22, 2009 Having just completed the annual Science & Technology Review, there was no doubt about the subject of this "Montage." For our primary mission, the annual delivery of science, the S&T Review provides us with a vehicle to judge ourselves. But it behooves to ask why it is that both we and the Department of Energy pay so much attention. After all, the review team, the consultants who are called in to help, is just a bunch of people off the street, our

  15. Overview of the Quality and Completeness of Resource Assessment Data for the APEC Region

    SciTech Connect (OSTI)

    Renne, D. S.; Pilasky, S.

    1998-02-01

    The availability of information and data on the renewable energy resources (solar, wind, biomass, geothermal, and hydro) for renewable energy technologies is a critical element in the successful implementation of these technologies. This paper presents a comprehensive summary of published information on these resources for each of 1 8 Asia-Pacific Economic Cooperation (APEC) economies. In the introductory sections, a discussion of the quality and completeness of this information is presented, along with recommendations on steps that need to be taken to facilitate the further development and deployment of renewable energy technologies throughout the APEC region. These sections are then followed by economy-specific reviews, and a complete bibliography and summary description for each citation. The major results of this survey are that a basis for understanding renewable energy resources is currently available for essentially all the economies, although there is a significant need to apply improved and updated resource assessment techniques in most. For example, most wind resource assessments rely on data collected at national weather stations, which often results in underestimates of the true potential wind resource within an economy. As a second example, solar resource assessments in most economies rely on an analysis of very simple sunshine record data, which results in large uncertainties in accurately quantifying the resource. National surveys of biomass, geothermal, and hydro resources are often lacking; in most cases, resources for these technologies were discussed for site-specific studies only. Thus, the major recommendations in this paper are to: ( 1 ) upgrade current or install new wind and solar measurement systems at key 'benchmark' locations to provide accurate, representative information on these resources; (2) apply advanced wind and solar resource assessment tools that rely on data quality assessment procedures, the use of satellite data, and models, and that can reliably interpolate the data collected at the benchmark sites; (3) conduct national surveys of biomass, geothermal, and hydro resources uniformly and consistently; and ( 4) establish a centralized data center that provides ready access to the most up-to-date and validated renewable resource data in all APEC economies.

  16. SSL TECHNOLOGY DEVELOPMENT WORKSHOP

    Broader source: Energy.gov [DOE]

    Rapid advances in SSL technology make it easy to forget that this technology is still at a relatively early stage of development, and much of its potential remains untapped. The 10th annual DOE SSL...

  17. Technology Readiness Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-15

    The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Supersedes DOE G 413.3-4.

  18. Technology Deployment Case Studies

    Broader source: Energy.gov [DOE]

    Find technology deployment case studies below. Click on each individual project link to see the full case study. You can also view a map of technology deployment case studies.

  19. Tag: technology transfer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17all en CNS, UT chemical sensing technology wins R&D 100 Award http:www.y12.doe.govnewspress-releasescns-ut-chemical-sensing-technology-wins-rd-100-award

  20. Open Government Technology Summit

    Broader source: Energy.gov [DOE]

    On January 25, 2012, the OCIO hosted the Open Government Technology Summit in Forrestal Auditorium.  Five speakers including Deputy U.S. Chief Technology Officer Chris Vein, DOE Director of New...

  1. Fuel Cell Technologies Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7/21/2015 eere.energy.gov Fuel Cell Technologies Overview States Energy Advisory Board (STEAB) Washington, DC Dr. Sunita Satyapal U.S. Department of Energy Fuel Cell Technologies Program Program Manager 3/14/2012 Outline * Introduction - Technology and Market Overview * DOE Program Overview - Mission & Structure - R&D Progress - Demonstration & Deployments * State Activities - Examples of potential opportunities 2 | Fuel Cell Technologies Program Source: US DOE 7/21/2015

  2. Technology Partnership Agreements | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technology Partnership Agreements Looking for Funding? We do not fund any projects under a technology partnership agreement. The partner provides the necessary resources and, in most cases, covers our costs of providing technical services. NREL does provide funding opportunities through competitively placed contracts. See procurement. There are a variety of ways to partner with NREL using technology partnership agreements. See a summary of our Fiscal Year 2015 technology partnership agreements.

  3. Geothermal Energy & Drilling Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy & Drilling Technology - Sandia Energy Energy Search Icon Sandia Home Locations ... Atmospheric Radiation Measurement Climate Reasearch Facility Geomechanics and Drilling ...

  4. TECHNOLOGY READINESS ASSESSMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any

  5. Robert Jilek: Pellion Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Robert Jilek: Pellion Technologies Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues » submit Robert Jilek: Pellion Technologies Senior research scientist at eastern energy storage startup September 3, 2014 Robert Jilek Robert Jilek Contact Linda Anderman Email Robert Jilek Jilek is currently with Pellion Technologies Bob Jilek is currently spending part of his time in a management role at Pellion Technologies in the Cambridge

  6. NREL: Geothermal Technologies - Capabilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... studies, regional sedimentary basin exploration, prospect generation, reservoir ... Technologies Office in assessment and evaluation of research and development projects. ...

  7. Membrane Technology Workshop

    Broader source: Energy.gov [DOE]

    Presentation by Charles Page (Air Products & Chemicals, Inc.) for the Membrane Technology Workshop held July 24, 2012

  8. Consumer Vehicle Technology Data

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  9. Technology Integration Overview

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  10. California Institute of Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sunday, July 29, 2012 California Institute of Technology Hameetman Auditorium at the Cahill Center 8:30 AM - 5:00 PM Speakers include: o Harry Atwater, Director, LMI-EFRC and Resnick Institute, California Institute of Technology o Ivan Celanovic, Principal Research Scientist, Massachusetts Institute of Technology o Geoffrey Kinsey, Director, Photovoltaic Technologies, Fraunhofer Center for Sustainable Energy o Sarah Kurtz, Principal Scientist, National Renewable Energy Laboratory o Minh Le,

  11. First National Technology Center

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Technology First National Technology Center Center Dennis Hughes FMA, RPA, P.E. Lead Property Manager, First National Buildings, Inc. 2 First National Technology First National Technology Center Center First National of Nebraska, Inc. - $12 Billion Assets - 5,400 employees - 6.6 million customers in 50 states - 60 banking locations Nebraska, Colorado, Kansas, South Dakota,Texas, Illinois - Largest in house merchant processor in United States Top ten VISA® and MasterCard® processor Top

  12. Fuel Cell Technologies Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    States Energy Advisory Board (STEAB) Washington, DC Dr. Sunita Satyapal U.S. Department of Energy Fuel Cell Technologies Program Program Manager 3/14/2012 2 | Fuel Cell Technologies Program Source: US DOE 3/19/2013 eere.energy.gov * Introduction - Technology and Market Overview * DOE Program Overview - Mission & Structure - R&D Progress - Demonstration & Deployments * State Activities - Examples of potential opportunities Outline 3 | Fuel Cell Technologies Program Source: US DOE

  13. Benchmarking of Competitive Technologies

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  14. Bioenergy Technologies Office

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 BETO Project Peer Review - Conversion Area Overview Bryna Guriel, Technology Manager Conversion R&D March 23 rd 2015 2 | Bioenergy Technologies Office eere.energy.gov Introduction to Conversion R&D 3 | Bioenergy Technologies Office eere.energy.gov * The strategic goal of the conversion program is to develop commercially viable technologies for converting feedstocks via biological and chemical routes energy-dense, fungible, finished liquid fuels, such as renewable gasoline, jet, and

  15. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Office Roland Risser Director, Building Technologies Office National Energy Consumption 40% 60% Reducing consumption or improving performance calls for cutting-edge energy-efficient solutions Aiming High for 2030 Double U.S. energy productivity Lower building energy use by 50% Annual energy use by 20 quads 1 billion metric tons CO 2 $200 billion for America's homes and buildings Delivering Energy-Efficient Solutions Co Emerging Technologies High-impact building technologies ~Five

  16. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roland Risser Director, Building Technologies Office Building Technologies Office Overview Our Homes and Buildings Use 40% of Our Nation's Energy and 75% of Electricity Energy Use Electricity Use Residential Transportation 21 quads 27 quads Commercial 18 quads Industrial 31 quads U.S. Energy Bill for Buildings: $410 billion per year 2 Building Technologies Office (BTO) Ecosystem Emerging Technologies Building Codes Appliance Standards Residential Buildings Integration Commercial Buildings

  17. Carbon Fiber Technology Facility

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  18. Carbon Fiber Technology Facility

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  19. Technology Performance Exchange

    SciTech Connect (OSTI)

    2015-09-01

    To address the need for accessible, high-quality data, the Department of Energy has developed the Technology Performance Exchange (TPEx). TPEx enables technology suppliers, third-party testing laboratories, and other entities to share product performance data. These data are automatically transformed into a format that technology evaluators can easily use in their energy modeling assessments to inform procurement decisions.

  20. High Impact Technology Hub

    Broader source: Energy.gov [DOE]

    The High Impact Technology Hub is a one stop shop for information associated with technology demonstrations in occupied, operational buildings. Resources posted to Hub should accelerate the selection and evaluation of technology demonstration projects and enable transparency into DOEs market stimulation and tech to market activities.