  1. EA-1867: Scale-up of High-Temperature Syngas Cleanup Technology, Polk County, Florida

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI’s high-temperature syngas cleanup and carbon capture and sequestration technologies.

  2. A DECISION SUPPORT SYSTEM FOR SOIL PRODUCTIVITY AND EROSION POLK COUNTY, NEBRASKA

    E-Print Network [OSTI]

    Reichenbach, Stephen E.

    A DECISION SUPPORT SYSTEM FOR SOIL PRODUCTIVITY AND EROSION IN POLK COUNTY, NEBRASKA A.E. Gadem1 erodible lands in Polk County, Nebraska. The approach combines soil productivity indices, derived from

  3. Chemical Composition of Soils of Cass, Dickens, Falls, Hardeman, Polk, Scurry, and Wheeler Counties

    E-Print Network [OSTI]

    Fraps, G. S. (George Stronach); Fudge, J. F. (Joseph Franklin)

    1940-01-01

    . A29-1239-6M-LIB6 TEXAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR COLLEGE STATION. BRAZOS COUNTY. TEXAS BULLETIN NO. 581 JANUARY 1940 DIVISION OF CHEMISTRY Chemical Composition Of The Soils Of Cass, Dickens, Falls, Hardeman, Polk..., Falls, Hardeman, Polk, Scurry, and Wheeler Counties. Chemical constitu- , ents in the individual soil types are graded in a system based upon the quantity of the constituent found in the soil; the system of grading and its relation to previous...

  4. An Archaeological Survey of the Polk County Landfill Expansion in Central Polk County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-23

    by the presence of sandy uplands overlooking a tributary of Barnett Creek to the north. Based on the potential for archaeological sites in the project area Po lk County retained BVRA to conduct a cultural resources survey. The proj ect number assigned.... 8 RESULTS AND RECOMMENDATIONS A 100% pedestrian survey of the 60 ac re project area did not locate any archaeological sites. The project area cons ists of uplands adjac ent to a tributary of Barnett Creek to the north. Two sma ll tributaries...

  5. A Phase I Archaeological Survey of the 10 Inch Force Main Relocation Project in West Central Polk County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-11

    A Phase I archaeological survey of approximately 6400 linear feet of rerouted force main in west-central Polk County, Texas was conducted in October 1999 by Brazos Valley Research Associates under antiquities permit 2266 issued by the Division...

  6. Landform technology at fort polk, louisiana: lessons learned. Final report

    SciTech Connect (OSTI)

    Smith, J.L.; Grafton, J.D.; Mann, D.K.

    1992-03-01

    Fort Polk, LA, is located in central Vernon Parish in West-Central Louisiana, about 6 miles southeast of the town of Leesville. In early 1983, a combination of factors prompted Fort Polk to explore alternatives for disposing of sewage sludge and contaminated soil. Changes in Louisiana's Solid Waste Rules and Regulations ended the practice of disposing of contaminated soil in the installation's landfill. Changing regulations were also affecting the disposal of sewage sludge. The technology investigated in this research is landfarming, a treatment process in which waste is mixed with the surface soil and is degraded, transformed, or immobilized. The surface soil is used as the treatment medium and the process is based primarily on the principle of aerobic decomposition of organic wastes. Compared to other land disposal treatments such as landfills and surface impoundments, landfarming has the potential to reduce monitoring and maintenance costs, as well as cleanup liabilities. Because of these reduced costs and liabilities, and the relatively low initial and operating costs, landfarming has received much attention as an ultimate disposal alternative.

  7. Orientation study in Hillsborough and Polk Counties, West-Central Florida

    SciTech Connect (OSTI)

    Karfunkel, B.S.

    1982-05-01

    An orientation study was conducted in Hillsborough and Polk Counties, west-central Florida, in preparation for a hydrogeochemical and stream sediment reconnaissance. The study was conducted by the Savannah River Laboratory as part of the National Uranium Resource Evaluation (NURE). A total of 60 surface sites and 294 ground water sites were sampled. The study includes field data and neutron activation analyses for uranium and supplemental elements, as well as determination of helium by mass spectroscopy. This report is issued in draft form, without detailed technical and copy editing. This was done to make the report available to the public before the end of the NURE program.

  8. Polk County Rural Pub Pwr Dist | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg,Energy LLC JumpPhono SolarPlexus SolMatters OhioCounty Rural

  9. Tampa Electric Company Polk Power Station IGCC Project -- Project status

    SciTech Connect (OSTI)

    Berry, T.E.

    1998-12-31

    The Tampa Electric Company Polk Power Station is a nominal 25 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located southeast of Tampa in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round III award. The Polk Power Station uses oxygen-blown, entrained-flow coal gasification technology licensed from Texaco Development Corporation in conjunction with a General Electric combined cycle with an advanced combustion turbine. This IGCC configuration demonstrates significant reductions of SO{sub 2} and NOx emissions when compared to existing and future conventional coal-fired power plants. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. It was placed into commercial operation on September 30, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. The presentation features an up-to-the-minute update of actual performance parameters achieved by the Polk Power Station. These parameters include overall capacity, heat rate, and availability. Tests of four alternate feedstocks were conducted, and the resulting performance is compared to that achieved on their base coal. This paper also provides an update of the general operating experiences and shutdown causes of the gasification facility throughout 1997. Finally, the future plans for improving the reliability and efficiency of the Unit will be addressed, as well as plans for future additional alternate fuel test burns.

  10. Tampa Electric Company, Polk Power Station IGCC Project: Project Status

    SciTech Connect (OSTI)

    Berry, T.E.; Shelnut, C.A.; McDaniel, J.E.

    1999-07-01

    Over the last ten years, Tampa Electric Company (TEC) has taken the Polk Power Station from a concept to a reality. The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy Clean Coal Technology Program pursuant to a Round III award. The Polk Power Station achieved first fire of the gasification system on schedule in mid-July, 1996. It was placed in commercial operation on September 30, 1996. Since start-up in July, 1996, significant advances have occurred in the design and operation of the entire IGCC train. This presentation will feature an up-to-the-minute update of actual performance parameters achieved by the Polk Power Station. These parameters include overall capacity, heat rate, and availability. Several different coal feedstocks have been tested and the resulting performance will be compared to that achieved on the base coal. This paper also provides an update of the general operating experiences and shutdown causes of the gasification facility. Finally, the future plans for improving the reliability and efficiency of the Unit will be addressed, as well as plans for future additional alternate fuel test burns.

  11. Health assessment for Cedartown Industries, Cedartown, Polk County, Georgia, Region 4. CERCLIS No. GAD95840674. Preliminary report

    SciTech Connect (OSTI)

    Not Available

    1990-01-29

    The Cedartown Industries, Inc. site has been proposed for the National Priorities List (NPL) by the U.S. Environmental Protection Agency (EPA). The 7-acre site is located in Cedartown, Polk County, Georgia, in the northwest part of the State. In 1986, one sediment sample from an on-site impoundment and two soil samples (one background) were collected on-site and analyzed by EPD. Only Extraction Procedure (EP) Toxicity testing was performed on these samples. The test which measures the concentration of leachate generated from the soil showed leachate with lead concentrations up to 720 parts per million (ppm) and cadmium concentrations up to 1.4 ppm. Based on the information reviewed, ATSDR has concluded that the site is of potential public health concern because humans may be exposed to hazardous substances at concentrations that may result in adverse health effects. As noted in the Human Exposure Pathways Section above, human exposure to lead may occur via ingestion of, inhalation of, and dermal contact with surface water, sediments, soils, ground water, air, and food-chain entities.

  12. Tampa Electric Company Polk Power Station IGCC project: Project status

    SciTech Connect (OSTI)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D.

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  13. Superfund Record of Decision (EPA Region 6): Mid-South Wood Products, Polk County, Arkansas, November 1986. First remedial action. Final report

    SciTech Connect (OSTI)

    Not Available

    1986-11-14

    The Mid-South Wood Products site is located in Polk County, Arkansas, approximately 1/2 mile southwest of Mena, Arkansas. The 57-acre site includes the following areas: the Old Plant site, the Small Old Pond and Old Pond areas, the North and South Landfarms, the landfill, Clear Lake and an existing chromated copper arsenate (CCA) treatment plant. The Old Plant site was used to treat wood with pentachlorophenol (PCP) and creosote; the Small Old Pond was the original impoundment for waste PCP and creosote. These two areas have been covered with soil. The Old Pond area was used to store PCP and creosote sludge and has since been graded and covered with soil; materials from the Old Pond were spread over the Landfarm areas and mixed into the soil; the Landfill area contains deposits of sawdust, woodchips, and other waste-wood products; Clear Lake receives runoff from all the above areas; the CCA treatment plant contains an ongoing wood-treating operation where the surface drainage from the plant is put in sumps.

  14. Polk power station syngas cooling system

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1995-01-01

    Tampa Electric Company (TEC) is in the site development and construction phase of the new Polk Power Station Unit No. 1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) Technology. The unit will utilize Texaco`s oxygen-blown, entrained-flow coal gasification, along with combined cycle power generation, to produce nominal 260MW. Integral to the gasification process is the syngas cooling system. The design, integration, fabrication, transportation, and erection of this equipment have provided and continue to provide major challenges for this project.

  15. Fort Polk EEAP. Final report

    SciTech Connect (OSTI)

    Busch, R.D.; Scheuch, K.E.; Shishman, T.T.

    1986-07-17

    This Final Presentation provides a summary of the work done under Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk Louisiana. The work was accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The vast majority of consumed energy at Fort Polk consists of electricity and natural gas. In FY75, Fort Polk used 48,399,000 kWh of electricity at a cost of $600,000. During that same period, 782,637 MCF of natural gas was purchased for $484,000. The total FY75 energy use was 1,368,327 MBtu.

  16. Polk Power Station Unit 1, Florida

    SciTech Connect (OSTI)

    Hornick, M.

    2007-10-15

    Problems encountered during the demonstration phase of the Polk River IGCC plant have been resolved and the plant is now operating reliably.

  17. Tampa Electric Company`s Polk Power Station IGCC project

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1995-12-31

    Tampa Electric Company (TEC) is in the construction phase of its new Polk Power Station Unit No. 1. This unique project incorporates the use of Integrated Gasification Combined Cycle (IGCC) technology for electric power production. The project is being partially funded by the US Department of Energy (DOE), as part of the Clean Coal Technology Program. This will help to demonstrate this state-of-the-art technology, providing utilities with the ability to use a wide range of coals in an efficient, environmentally superior manner. During the summer of 1994, TEC began site development at the new Polk Power Station. Since that time, most of the Site work has been completed, and erection and installation of the power plant equipment is well underway. This is the first time that IGCC technology will be installed at a new unit at a greenfield site. This is a major endeavor for TEC in that Polk Unit No. 1 is a major addition to the existing generating capacity and it involves the demonstration of technology new to utility power generation. As a part of the Cooperative Agreement with the DOE, TEC will also be demonstrating the use of a new Hot Gas Clean-Up System which has a potential for greater IGCC efficiency.

  18. Geothermal heat pumps at Fort Polk: Early results

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.

    1996-12-31

    At Fort Polk, LA an entire city (4,003 military family housing units) is being converted to geothermal heat pumps (GHP) under a performance contract. At the same time other efficiency measures such as compact fluorescent lights (CFLs), low-flow water outlets, and attic insulation are being installed. If these contracts and this technology are to be used widely in US Department of Defense (DoD) facilities and other public buildings, better data from actual projects is the key. Being the first GHP project of this type and size, Fort Polk proved to be very challenging for all concerned. To get from RFP to start of construction took several years. This hard work by others created a once-in-a-lifetime opportunity to address many of the due diligence issues that delayed the Fort Polk project. So that future projects can move faster, an evaluation has been undertaken to address the following barriers: absence of a documented large-scale demonstration of GHP energy, demand, and maintenance savings (a barrier to acceptance by federal customers, performance contractors, and investors); newness of large-scale facility capital renewal procurements at federal facilities under energy savings performance contracts (ESPCs) or traditional appropriations (lack of case studies); and variability in current GHP design tools (increases risks and costs for federal customers, performance contractors, investors and designers). This paper presents early energy and demand savings results based on data collection through January 1996.

  19. BIOMASS COGASIFICATION AT POLK POWER STATION

    SciTech Connect (OSTI)

    John McDaniel

    2002-05-01

    Part of a closed loop biomass crop was recently harvested to produce electricity in Tampa Electric's Polk Power Station Unit No.1. No technical impediments to incorporating a small percentage of biomass into Polk Power Station's fuel mix were identified. Appropriate dedicated storage and handling equipment would be required for routine biomass use. Polk Unit No.1 is an integrated gasification combined cycle (IGCC) power plant. IGCC is a new approach to generating electricity cleanly from solid fuels such as coal, petroleum coke, The purpose of this experiment was to demonstrate the Polk Unit No.1 could process biomass as a fraction of its fuel without an adverse impact on availability and plant performance. The biomass chosen for the test was part of a crop of closed loop Eucalyptus trees.

  20. EIS-0210: Tampa Electric Company-Polk Power Station (Adopted)

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency prepared this statement to fulfill its National Environmental Policy Act requirements with respect to the potential issuance of a permit to the Tampa Electric Company under the National Pollutant Discharge Elimination System for the 1,150-MW Polk Power Station, a new pollutant source. The U.S. Department of Energy served as a cooperating agency in the development of this document due to its potential role to provide cost-shared financial assistance for a 260-MW Integrated Gasification Combined Cycle unit at the Power Station under its Clean Coal Technology Demonstration Project, and adopted the document by August 1994.

  1. Renewable Energy Opportunities at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Solana, Amy E.; Boyd, Brian K.; Horner, Jacob A.; Gorrissen, Willy J.; Orrell, Alice C.; Weimar, Mark R.; Hand, James R.; Russo, Bryan J.; Williamson, Jennifer L.

    2010-11-17

    This document provides an overview of renewable resource potential at Fort Polk, based primarily upon analysis of secondary data sources supplemented with limited on-site evaluations. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the U.S. Army Installation Management Command (IMCOM) as follow-on to the 2005 Department of Defense (DoD) Renewables Assessment. The site visit to Fort Polk took place on February 16, 2010.

  2. Start S Morgan St End 1933 W Polk St, Chicago, IL 60612

    E-Print Network [OSTI]

    Spirtes, Peter

    Start S Morgan St End 1933 W Polk St, Chicago, IL 60612 When 10/5/11 after 7:00pm Duration 11 mins total Loading... ©2011 Google - Map data ©2011 Google, Sanborn - S Morgan St to 1933 W Polk St, Chicago stops) Polk & Wolcott Walk to 1933 W Polk St, Chicago, IL 60612 About 1 min 1933 W Polk St, Chicago, IL

  3. Liberty County State of the Community 

    E-Print Network [OSTI]

    Tedford, Emily; Gao, Fan; Reja, Md Yousuf

    2015-01-01

    Tyler County and parts of what later became Hardin, Chambers, San Jacinto, and Polk counties. The County’s early development focused on agriculture, especially timber production, since timber could be floated down the Trinity River to Houston-area ports...

  4. An Archaeological Survey of the Site of the Proposed Onalaska Junior/Senior High School in West-Central Polk, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-25

    A Phase I archaeological survey of a 75 acre tract in west-central Polk County, Texas was conducted in January of 2002 by Brazos Valley Research Associates (BVRA) in Bryan, Texas under Antiquities Permit 2783 issued by the Archeology Division, Texas...

  5. A QUANTITATIVE STUDY OF THE VEGETATION SURROUNDING POPULATIONS OF UVULARIA SESSILIFOLIA (LILIACEAE) AT FORT POLK

    E-Print Network [OSTI]

    ) AT FORT POLK IN WEST CENTRAL LOUISIANA, U.S.A. Ariel Dauzart, Charles Allen, Stacy Huskins, and Jacob Delahoussaye Colorado State University, Fort Polk 1645 23rd Street Fort Polk, Louisiana 71459, U.S.A. abstract are reported from Fort Polk in Vernon Parish. Some of these are small with only a few or only one stem

  6. An Archaeological Survey for the Eastham State Prison Farm 5-1 Well Location and Clay Pond in Houston County Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-30

    in Houston County, Texas. Brazos Valley Research Associates, Contract Report Number 193. Nunley, John P. 1963 Appraisal of the Archeological Resources of Livingston Reservoir, Polk, San Jacinto, Trinity, and Walker Counties, Texas. Report submitted...

  7. Tampa Electric Company`s Polk Power Station Integrated Gasification Combined Cycle Project

    SciTech Connect (OSTI)

    Jenkins, S.D.; Shafer, J.R.

    1994-12-31

    Tampa Electric Company (TEC) is in the construction phase for the new Polk Power Station, Unit {number_sign}1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) technology for power generation. The unit will utilize oxygen-blown entrained-flow coal gasification, along with combined cycle technology, to provide nominal net 26OMW of generation. As part of the environmental features of this process, the sulfur species in the coal will be recovered as a commercial grade sulfuric acid by-product. The sulfur will be removed from the synthesis gas utilizing a cold gas clean-up system (CGCU).

  8. Start S Morgan St End 1933 W Polk St, Chicago, IL 60612

    E-Print Network [OSTI]

    Spirtes, Peter

    Start S Morgan St End 1933 W Polk St, Chicago, IL 60612 When 10/5/11 after 9:09pm Duration 19 mins total Loading... ©2011 Google - Map data ©2011 Google, Sanborn - S Morgan St to 1933 W Polk St, Chicago District Walk to 1933 W Polk St, Chicago, IL 60612 Beta: Use caution ­ This route may be missing sidewalks

  9. Start S Morgan St End 1933 W Polk St, Chicago, IL 60612

    E-Print Network [OSTI]

    Spirtes, Peter

    Start S Morgan St End 1933 W Polk St, Chicago, IL 60612 When 10/5/11 after 9:00pm Duration 17 mins total Loading... ©2011 Google - Map data ©2011 Google, Sanborn - S Morgan St to 1933 W Polk St, Chicago mins Harrison & Morgan Bus - 7 - Harrison towards Central 9:07pm - 9:14pm (7 mins, 10 stops) Polk

  10. Polk County, Arkansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: Energy Resources Jump to:

  11. Polk County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: Energy Resources Jump

  12. Polk County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: Energy Resources

  13. Polk County, Iowa: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: Energy ResourcesIowa: Energy

  14. Polk County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: Energy ResourcesIowa:

  15. Polk County, Missouri: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: Energy

  16. Polk County, Nebraska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: EnergyNebraska: Energy

  17. Polk County, North Carolina: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: EnergyNebraska: EnergyNorth

  18. Polk County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: EnergyNebraska:

  19. Polk County, Tennessee: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas: EnergyNebraska:Tennessee:

  20. Polk County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas:

  1. Polk County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy ResourcesArkansas:Wisconsin: Energy Resources

  2. The Old Sage of the Arkansaw: Polk Cline

    E-Print Network [OSTI]

    Hoeflich, Michael H.

    2008-03-01

    to the offices of the town's most singular at- He would have been wearing a formal, frock coat, but likely torney, G. Polk Cline. Had you been accused of a crime you without a tie, since he never learned to tie one. If you'd would almost certainly have gone up..., three big windows. The room was dominated no shoes would have been on his feet, for by an enormous walnut desk; according to its avored the barefoot look. owner it was 18 feet long. There were cabinets Polk Cline was born in 185 1 in Da- filled...

  3. An Archaeological Survey for the CGG Veritas Middleton Ranch 3-D Seismic Survey in Chambers County Texas 

    E-Print Network [OSTI]

    Moore, William; Baxter, Edward

    2015-07-31

    1988 The Crawford Site, 41PK69, Central Trinity River Uplands, Polk County, Texas. Contract Reports in Archaeology Number 4, Highway Design Division, Texas State Department of Highways and Public Transportation, Austin. 1989 Alabonson Road: Early...

  4. Tampa Electric Company, Polk Power Station Unit No. 1, preliminary public design report

    SciTech Connect (OSTI)

    1994-06-01

    This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE`s project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

  5. An Archaeological Survey for the Eastham State Prison Farm A-1 and 7-1 Well Locations in Houston County Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-29

    Appraisal of the Archeological Resources of Livingston Reservoir, Polk, San Jacinto, Trinity, and Walker Counties, Texas. Report submitted to the National Park Service by the Texas Archeological Salvage Project, The University of Texas at Austin...

  6. TenniVis: Visualization for Tennis Match Analysis Tom Polk, Member, IEEE, Jing Yang, Yueqi Hu, and Ye Zhao

    E-Print Network [OSTI]

    Ras, Zbigniew W.

    TenniVis: Visualization for Tennis Match Analysis Tom Polk, Member, IEEE, Jing Yang, Yueqi Hu Polk, Jing Yang, and Yueqi Hu are with the University of North Carolina at Charlotte. E-mail: tepolk

  7. An Evaluation of the Fort Polk Energy Savings Performance Contract

    SciTech Connect (OSTI)

    Hughes, Patrick; Shonder, John A

    1998-08-01

    The US Army, in cooperation with an energy services company (ESCO), used private capital to retrofit 4003 family housing units on the Fort Polk, Louisiana, military base with geothermal heat pumps (GHPs). The project was performed under an energy savings performance contract (ESPC) that provides for the army and the ESCO to share the cost savings realized through the energy retrofit over the 20-year life of the contract. Under the terms of the contract, the ESCO is responsible for maintaining the GHPs and provides ongoing measurement and verification (M&V) to assure cost and energy savings to the Army. An independent evaluation conducted by the Department of Energy's Oak Ridge National Laboratory indicates that the GHPS systems in combination with other energy retrofit measures have reduced annual whole-community electrical consumption by 33%, and natural gas consumption by 100%. These energy savings correspond to an estimated reduction in CO{sub 2} emissions of 22,400 tons per year. Peak electrical demand has been reduced by 43%. The electrical energy and demand savings correspond to an improvement in the whole-community annual electric load factor from 0.52 to 0.62. As a result of the project, Fort Polk saves about $450,000 annually and benefits from complete renewal of the major energy consuming systems in family housing and maintenance of those systems for 20 years. Given the magnitude of the project, the cost and energy savings achieved, and the lessons learned during its design and implementation, the Fort Polk ESPC can provide a model for other housing-related energy savings performance contracts in both the public and private sectors.

  8. An evaluation of the Fort Polk energy savings performance contract

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.

    1998-11-01

    The US Army, in cooperation with an energy services company (ESCO), used private capital to retrofit 4,003 family housing units on the Fort Polk, Louisiana, military base with geothermal heat pumps (GHPs). The project was performed under an energy savings performance contract (ESPC) that provides for the Army and the ESCO to share the cost savings realized through the energy retrofit over the 20-year life of the contract. Under the terms of the contract, the ESCO is responsible for maintaining the GHPs and provides ongoing measurement and verification (M and V) to assure cost and energy savings to the Army. An independent evaluation conducted by the Department of Energy`s Oak Ridge National Laboratory indicates that the GHP systems in combination with other energy retrofit measures have reduced annual whole-community electrical consumption by 33%, and natural gas consumption by 100%. These energy savings correspond to an estimated reduction in CO{sub 2} emissions of 22,400 tons per year. Peak electrical demand has been reduced by 43%. The electrical energy and demand savings correspond to an improvement in the whole-community annual electric load factor from 0.52 to 0.62. As a result of the project, Fort Polk saves about $450,000 annually and benefits from complete renewal of the major energy consuming systems in family housing and maintenance of those systems for 20 years. Given the magnitude of the project, the cost and energy savings achieved, and the lessons learned during its design and implementation, the Fort Polk ESPC can provide a model for other housing-related energy savings performance contracts in both the public and private sectors.

  9. Final Technical Report Laramie County Community College: Utility-Scale Wind Energy Technology

    SciTech Connect (OSTI)

    Douglas P. Cook

    2012-05-22

    The Utility-Scale Wind Energy Technology U.S. Department of Energy (DOE) grant EE0000538, provided a way ahead for Laramie County Community College (LCCC) to increase educational and training opportunities for students seeking an Associate of Applied Science (AAS) or Associate of Science (AS) degree in Wind Energy Technology. The DOE grant enabled LCCC to program, schedule, and successfully operate multiple wind energy technology cohorts of up to 20-14 students per cohort simultaneously. As of this report, LCCC currently runs four cohorts. In addition, the DOE grant allowed LCCC to procure specialized LABVOLT electronic equipment that directly supports is wind energy technology curriculum.

  10. Membrane Technology for Produced Water in Lea County

    SciTech Connect (OSTI)

    Cecilia Nelson; Ashok Ghosh

    2011-06-30

    Southeastern New Mexico (SENM) is rich in mineral resources, including oil and gas. Produced water is a byproduct from oil and gas recovery operations. SENM generates approximately 400 million barrels per year of produced water with total dissolved solids (TDS) as high as ~ 200,000 ppm. Typically, produced water is disposed of by transporting it to injection wells or disposal ponds, costing around $1.2 billion per year with an estimated use of 0.3 million barrels of transportation fuel. New Mexico ranks first among U.S. states in potash production. Nationally, more than 85% of all potash produced comes from the Carlsbad potash district in SENM. Potash manufacturing processes use large quantities of water, including fresh water, for solution mining. If the produced water from oilfield operations can be treated and used economically in the potash industry, it will provide a beneficial use for the produced water as well as preserve valuable water resources in an area where fresh water is scarce. The goal of this current research was to develop a prototype desalination system that economically treats produced water from oil and/or natural gas operations for the beneficial use of industries located in southeastern New Mexico. Up until now, most water cleaning technologies have been developed for treating water with much lower quantities of TDS. Seawater with TDS of around 30,000 ppm is the highest concentration that has been seriously studied by researchers. Reverse osmosis (RO) technology is widely used; however the cost remains high due to high-energy consumption. Higher water fluxes and recoveries are possible with a properly designed Forward Osmosis (FO) process as large driving forces can be induced with properly chosen membranes and draw solution. Membrane fouling and breakdown is a frequent and costly problem that drives the cost of desalination very high. The technology developed by New Mexico Tech (NMT) researchers not only protects the membrane, but has also proven to generate higher water flux, based on the series of experiments conducted. Laboratory tests at NMT demonstrated that an unprecedented water flux of 1300 l/m2/hr (where typical flux is on the order of 0-3 l/m{sup 2}/hr) can be achieved from a properly designed membrane module. The patent pending NMT system, which was designed and developed at NMT was successful in reducing the possibility for concentration polarization and thereby increasing the permeate water flux, while still maintaining a high salt rejection rate of 96% or greater. For feed solutions having a dissolved contaminant concentration greater than 10,000 ppm, preliminary economic analysis demonstrates that a well-designed FO process will outperform an RO process. Most produced water generated in SENM has TDS higher than 10,000 ppm. Therefore, it is logical to use FO to desalinate the water. Since the issues associated with concentration polarization has only recently been solved by our mechanically enhanced membrane module, the level of system maturity is not at the same level as that for RO. Our efforts going forward will be directed at taking the technology to a higher level of system maturity. With the superior cost effectiveness for FO, it is imperative that this technology reach a point that is competitive with RO in order to meet the expanding need for water for industries in SENM. NMT seeks to demonstrate the greater cost effectiveness by proving the process through a scaled up model. To ensure success, NMT feels it is important to demonstrate this technology in a larger system, (~ 100,000 GPD), before venturing to the commercial scale. This will build confidence in the process with the commercial sector. In addition, it will be possible to develop some of the operational processes around renewable energy sources for the scaled up model. This will further lower the operating costs and enhance the environmentally clean aspect of the process.

  11. Daemen Alternative Energy/Geothermal Technologies Demonstration Program Erie County

    SciTech Connect (OSTI)

    Robert C. Beiswanger, Jr.

    2010-05-20

    The purpose of the Daemen Alternative Energy/Geothermal Technologies Demonstration Project is to demonstrate the use of geothermal technology as model for energy and environmental efficiency in heating and cooling older, highly inefficient buildings. The former Marian Library building at Daemen College is a 19,000 square foot building located in the center of campus. Through this project, the building was equipped with geothermal technology and results were disseminated. Gold LEED certification for the building was awarded. 1) How the research adds to the understanding of the area investigated. This project is primarily a demonstration project. Information about the installation is available to other companies, organizations, and higher education institutions that may be interested in using geothermal energy for heating and cooling older buildings. 2) The technical effectiveness and economic feasibility of the methods or techniques investigated or demonstrated. According to the modeling and estimates through Stantec, the energy-efficiency cost savings is estimated at 20%, or $24,000 per year. Over 20 years this represents $480,000 in unrestricted revenue available for College operations. See attached technical assistance report. 3) How the project is otherwise of benefit to the public. The Daemen College Geothermal Technologies Ground Source Heat Pumps project sets a standard for retrofitting older, highly inefficient, energy wasting and environmentally irresponsible buildings�¢����quite typical of many of the buildings on the campuses of regional colleges and universities. As a model, the project serves as an energy-efficient system with significant environmental advantages. Information about the energy-efficiency measures is available to other colleges and universities, organizations and companies, students, and other interested parties. The installation and renovation provided employment for 120 individuals during the award period. Through the new Center, Daemen will continue to host a range of events on campus for the general public. The College does not charge fees for speakers or most other events. This has been a long-standing tradition of the College.

  12. Tampa Electric Company, Polk Power Station Unit No. 1. Annual report, January--December 1992

    SciTech Connect (OSTI)

    1993-10-01

    As part of the Tampa Electric Polk Power Unit No. 1, a Texaco pressurized, oxygen-blown entrained-flow coal gasifier will convert approximately 2300 tons per day of coal (dry basis) into a medium-BTU fuel gas with a heat content of about 250 BTU/scf (LHV). Syngas produced in the gasifier flows through a high-temperature heat recovery unit which cools the gases prior to entering two parallel clean-up areas. A portion (up to 50%) of the hot syngas is cooled to 1000{degrees}F and passed through a moving bed of zinc titanate sorbent which removed sulfur containing components of the fuel gas. The project will be the first in the world to demonstrate this advanced metal oxide hot gas desulfurization technology at a commercial scale. The remaining portion of the syngas is cooled to 400{degrees}F for conventional acid gas removal. This portion of the plant is capable of processing between 50% and 100% of the dirty syngas. The cleaned low-BTU syngas is then routed to the combined cycle power generation system where it is mixed with air and burned in the gas turbine combustor. Heat is extracted from the expanded exhaust gases by a heat recovery steam generator to produce high pressure steam. This steam, along with the steam generated in the gasification process, drives a steam turbine to generate an additional 132MW of power. Internal process power consumption is approximately 62MW, and includes power for coal grinding, air separation, and feed pumps. Net output from the IGCC demonstration plant will be 260MW.

  13. The Lakeland McIntosh Unit 4 demonstration project utilizing Foster Wheeler`s pressurized circulating fluidized-bed combustion technology

    SciTech Connect (OSTI)

    McClung, J.D.; Provol, S.J.; Morehead, H.T.; Dodd, A.M.

    1997-12-31

    The City of Lakeland, Florida, Foster Wheeler and the Westinghouse Electric Corporation have embarked on the demonstration of a Clean Coal Technology at the City of Lakeland`s McIntosh Power Station in lakeland, Polk County, Florida. The project will demonstrate the Pressurized Circulating Fluidized Bed Combustion (PCFB) technology developed by Foster Wheeler and Westinghouse. The Lakeland McIntosh Unit 4 Project is a nominal 170 MW power plant designed to burn a range of low- to high-sulfur coals. The combined cycle plant employs a Westinghouse 251B12 gas turbine engine in conjunction with a steam turbine operating in a 2400/1000/1000 steam cycle. The plant will demonstrate both the PCFB and topped PCFB combustion technologies. This paper provides a process description of the Foster Wheeler PCFB and Topped PCFB technologies and their application to the Lakeland McIntosh Unit 4 Project.

  14. Methodology for the evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.; White, D.L.; Huang, H.L.

    1998-03-01

    The US Army and a private energy service company are developing a comprehensive energy efficiency project to upgrade the family housing at Fort Polk, Louisiana. The project includes converting the space conditioning systems of more than 4,000 housing units to geothermal (or ground-source) heat pumps (GHPs). This interim report describes the methodology of the evaluation associated with this project, including the field monitoring that has been conducted at the base.

  15. Energy Engineering Analysis Program (EEAP) Fort Polk airfield lighting; lighting retrofit

    SciTech Connect (OSTI)

    1993-03-01

    The purpose of this study is to analyze the existing lighting types and levels at three different maintenance hangars (Buildings. No. 4262, No. 4295, and No. 4297) at Fort Polk and to make recommendations for the most economical and preferred new lighting fixtures, arrangements, and method of control. The Life Cycle Cost In Design (LCCID) program was used to determine the Life Cycle Cost (LCC) and Savings to Investment Ratio (SIR) for the analyzed retrofit for a 20 year study life.

  16. Depositional environment of woodbine sandstones, Polk, Tyler and San Jacinto Counties, Texas 

    E-Print Network [OSTI]

    Foss, Deane Campbell

    1978-01-01

    of oil in degrees API c. SITP = shut-in tubing pressure (pounds per square in. ) BHSIP = bottom hole shut-in pressure (pounds per square in. ) 22 while wells in the Seven Oaks field are normally pressured. Accord- ing to Kiatta (1974), Hortense... section can be divided up into Lower, Middle, and non-bioturbated and bioturbated Upper units of interbedded sandstones and shales. Strike-trending, pod-shaped concentrations of bioturbated Upper sandstones are the principle reservoirs in these fields...

  17. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  18. Polk-Burnett Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg,Energy LLC JumpPhono SolarPlexus SolMatters OhioCounty

  19. IFAS Matters -December 2012 -Institute of Food and Agricultural Sciences -University of Florida http://www.ifas.ufl.edu/newsletter/december2012.shtml[3/31/2015 3:07:47 PM

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    to help even more do so with a new video series. Read Article>> Polk County Water School Polk County

  20. Census Snapshot: Iowa

    E-Print Network [OSTI]

    MacCartney, Danielle; Badgett, M.V. Lee; Gates, Gary J

    2007-01-01

    every county in Iowa. In 2000, Polk County reported the mostPage Palo Alto Plymouth Polk Pottawattamie Poweshiek Sac

  1. 2008 Florida Youth Tobacco Survey, County Data Book

    E-Print Network [OSTI]

    Florida Department of Health, Brueau of Epidemiology; Crist, Charlie; Viamonte Ros, Ana M M.D., M.P.H.

    2009-01-01

    Palm Beach Pasco Pinellas Polk Putnam St. Johns St. LucieBrevard Pinellas Hillsborough Polk Osceola State PercentagePalm Beach Pasco Pinellas Polk Putnam St. Johns St. Lucie

  2. Geothermal heat pump energy savings performance contract at Fort Polk, LA: Lessons learned

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.; Gordon, R.; Giffin, T.

    1997-08-01

    At Fort Polk, LA the space conditioning systems of 4,003 military family housing units have been converted to geothermal heat pumps (GHP) under an energy savings performance contract (ESPC). At the same time, other efficiency measures, such as compact fluorescent lights (CFLs), low-flow shower heads, and attic insulation, were installed. An independent evaluation of the Fort Polk ESPC was carried out. Findings indicate that the project has resulted in a 25.6 million kWh savings in electrical energy use, or 32.4% of the pre-retrofit electrical consumption in family housing, for a typical meteorological year. Peak electrical demand has also been reduced by 6,541 kW, which is 39.6% of the pre-retrofit peak demand. Natural gas savings are about 260,000 therms per year. In addition, the ESPC has allowed the Army to effectively cap its future expenditures for family housing HVAC maintenance at about 77% of its previous costs. Given these successful results, the Fort Polk ESPC can provide a model for other ESPCs in both the public and the private sectors. The purpose of this paper is to outline the method by which the ESPC was engineered and implemented, both from the standpoint of the facility owner (the US Army) and the energy services company (ESCO) which is carrying out the contract. The lessons learned from this experience should be useful to other owners, ESCOs and investors in the implementation of future ESPCs. It should be noted that the energy savings presented in this document are the apparent energy savings observed in the monitored data, and are not to be confused with the contracted energy savings used as the basis for payments. To determine the contracted energy savings, the apparent energy savings may require adjustments for such things as changes in indoor temperature performance criteria, additions of ceiling fans, and other factors.

  3. Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA: Lessons Learned

    SciTech Connect (OSTI)

    Hughes, Patrick; Shonder, John A; Gordon, Richard; Giffin, Tom

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of 4,003 military family housing units have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorecent lights, low-flow shower heads, and attic insulation, were installed. An independent evaluation of the Fort Polk energy savings performance contract was carried out. Findings indicate that the project has resulted in a 25.6 million kWh savings in electrical energy use, or 32.4% of the pre-retrofit electrical consumption in family housing, for a typical meteorological year. Peak electrical demand has also been reduced by about 6,761 kW, which is 40.2% of the pre-retrofit peak demand. Natural gas savings are about 260,000 therms per year. In addition, the energy savings performance contract has allowed the Army to effectively cap its future expenditures for family housing HVAC maintenance at about 77% of its previous costs. Given these successful results, the Fort Polk performance contract can provide a model for other contracts in both the public and private sectors. The purpose of this paper is to outline the method by which the contract was engineed and implemented, both from the standpoint of the facility owner (the U.S. Army) and the energy services company that is carrying out the contract. The lessons learned from this experience should be useful to other owners, service companies, and investors in the implementation of future service contracts. It should be noted that the energy savings presented in this document are the 'apparent' energy savings observed in the monitored data and not to be mistaken for the 'contract' energy savings used as the basis for payments. To determine the 'contracted' energy savings, the 'apparent' energy savings may require adjustments for such things as changes in the indoor temperature performance criteria, additions of ceiling fans, and other factors.

  4. Energy engineering analysis program, Fort Polk, Louisiana. Pre-final executive summary, increment `f`

    SciTech Connect (OSTI)

    1987-11-01

    Executive Order 12003, dated 19 July 1977, initiated the U.S. Army`s energy conservation effort. Specifically, the Executive Order led to the development of the Army Facilities Energy Plan which directs Army Staff and Major Army Commands to develop detailed implementation plans for energy conservation. As a result of these directives, the Fort Worth District of the U.S. Army Corps of Engineers contracted for an Energy Engineering Analysis Program (EEAP) at Fort Polk, Louisiana. The EEAP included Increments `A`, `B`, `E`, and `O`.

  5. Municipal solid waste combustion: Waste-to-energy technologies, regulations, and modern facilities in USEPA Region V

    SciTech Connect (OSTI)

    Sullivan, P.M.; Hallenbeck, W.H.; Brenniman, G.R.

    1993-08-01

    Table of Contents: Incinerator operations (Waste preprocessing, combustion, emissions characterization and emission control, process monitoring, heat recovery, and residual ash management); Waste-to-energy regulations (Permitting requirements and operating regulations on both state and Federal levels); Case studies of EPA Region V waste-to-energy facilities (Polk County, Minnesota; Jackson County, Michigan; La Crosse, Wisconsin; Kent County, Michigan; Elk River, Minnesota; Indianapolis, Indiana); Evaluation; and Conclusions.

  6. Clearwater-Polk Elec Coop Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal Technologies Place:Standards Jump to: navigation,Now

  7. Energy Engineering Analysis Program, Fort Polk, Louisiana. Final executive summary, increment `f`

    SciTech Connect (OSTI)

    1988-06-01

    Executive Order 12003, dated 19 July 1977, initiated the U.S. Army`s energy conservation effort. Specifically, the Executive Order led to the development of the Army Facilities Energy Plan which directs Army Staff and Major Army Commands to develop detailed implementation plans for energy conservation. As a result of these directives, the Fort Worth District of the U.S. Army Corps of Engineers contracted for an Energy Engineering Analysis Program (EEAP) at Fort Polk, Louisiana. The EEAP included Increments `A`, `B`, `E`, and `G`. To accomplish the intent of Increment `P`, namely, providing low cost/no cost energy savings recommendations in the form of specific, practical instructions for use by the Facility Engineer, the following general steps were taken: (1) Consider treasures identified in Detailed Scope of Work. (2) identify other potential Low Cost/No Cost energy Conservation Measures (ECM) through discussions with Fort Polk personnel and field surveys by Graham Associates engineers. (3) Review Increments `A`, `B`, and `G` for ECM`s within the Facility Engineer`s funding authority; $200,000 for alteration projects and $1,000,000 for maintenance and repair type work. (4) Evaluate ECM`s using relevant data for other Increments of the ESAP, and develop new data where appropriate.

  8. Seeing Savings from an ESPC Project in Fort Polk's Utility Bills

    SciTech Connect (OSTI)

    Shonder, J.A.

    2005-03-08

    Federal agencies have implemented many energy efficiency projects over the years with direct funding or alternative financing vehicles such as energy savings performance contracts (ESPCs). While it is generally accepted that these projects save energy and costs, the savings are usually not obvious in the utility bills. This is true for many valid technical reasons, even when savings are verified in other ways to the highest degree of certainty. However, any perceived deficiency in the evidence for savings is problematic when auditors or other observers evaluate the outcome of energy projects and the achievements of energy management programs. This report discusses under what circumstances energy savings should or should not be evident in utility bills. In the special case of a large ESPC project at the Army's Fort Polk, the analysis of utility bills carried out by the authors does unequivocally confirm and quantify savings. The data requirements and methods for arriving at definitive answers through utility bill analysis are demonstrated in our discussion of the Fort Polk project. The following paragraphs address why the government generally should not expect to see savings from ESPC projects in their utility bills. We also review lessons learned and best practices for measurement and verification (M&V) that can assure best value for the government and are more practical, straightforward, and cost-effective than utility bill analysis.

  9. Energy Engineering Analysis Program - Fort Polk, Louisiana. Executive summary. Final report

    SciTech Connect (OSTI)

    1986-03-01

    The CRS Group, Inc. is pleased to submit this Final Report covering Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk, Louisiana work accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The work presented in these volumes presents the results in which 32 energy conserving measures (ECM`s) have been investigated for ECIP potential for Increments A (existing buildings including Family Housing) and B (existing utilities and energy distribution systems and a centralized Energy Monitoring and Control System-EMCS). Additionally, five scenarios for implementation of a Central Energy Plant (CEP) were studied under Increment E and an analysis of using waste POL as a fuel source in three scenarios was made. Four projects were analyzed under Increment G to identify additional energy savings.

  10. The evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana: Final Report

    SciTech Connect (OSTI)

    Hughes, P.J.; Shonder, J.A.

    1998-03-01

    This report documents an independent evaluation of an energy retrofit of 4,003 family housing units at Fort Polk, Louisiana, under an energy savings performance contract (ESPC). Replacement of the heating, cooling, and water heating systems in these housing units with geothermal heat pumps (GHPs) anchored the retrofit; low-flow shower heads and compact fluorescent lighting were also installed, as well as attic insulation where needed. Statistically valid findings indicate that the project will save 25.8 million kWh, or 32.5% of the pre-retrofit whole-community electrical consumption, and 100% of the whole-community natural gas previously used for space conditioning and water heating (260,000 therms) in a typical meteorological year. At the end-use level, the GHPs were found to save about 42% of the pre-retrofit electrical consumption for heating, cooling, and water heating in housing units that were all-electric in the pre-retrofit period. This report also demonstrates an improved method of predicting energy savings. Using an engineering model calibrated to pre-retrofit energy use data collected in the field, the method predicted actual energy savings on one of the electric feeders at Fort Polk with a very high degree of accuracy. The accuracy of this model was in turn dependent on data-calibrated models of the geothermal heat pump and ground heat exchanger that are described in this report. In addition this report documents the status of vertical borehole ground heat exchanger (BHEx) design methods at the time this project was designed, and demonstrates methods of using data collected from operating GHP systems to benchmark BHEx design methods against a detailed engineering model calibrated to date. The authors also discuss the ESPC`s structure and implementation and how the experience gained here can contribute to the success of future ESPCs.

  11. Evaluating Functional Localizers: The Case of the FFA Marc G. Berman1,2, Joonkoo Park1, Richard Gonzalez1, Thad A. Polk1,3, Amanda Gehrke1,

    E-Print Network [OSTI]

    Jonides, John

    Gonzalez1, Thad A. Polk1,3, Amanda Gehrke1, Scott Knaffla1, and John Jonides1 1Department of Psychology

  12. Environmental assessment and finding of no significant impact: Biorecycling Technologies, Inc., Noble Biogas and Fertilizer Plant, Fresno County, California

    SciTech Connect (OSTI)

    NONE

    1997-09-01

    The US Department of Energy (DOE) is considering a proposal from the California Energy Commission for partial funding up to $1,500,000 of the construction of the biorecycling Technologies, Inc., (BTI) Noble Biogas and Fertilizer Plant in Fresno County, California. BTI along with its contractors and business partners would develop the plant, which would use manure and green waste to produce biogas and a variety of organic fertilizer products. The California Energy Commission has requested funding from the DOE Commercialization Ventures program to assist in the construction of the plant, which would produce up to one megawatt of electricity by burning biogas in a cogeneration unit. The purpose of this environmental assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with funding development of the proposed project.

  13. Building America Best Practices Series - High-Performance Home Technologies: Guide to Determining Climate Regions by County

    SciTech Connect (OSTI)

    Baechler, Michael C.; Gilbride, Theresa L.; Cole, Pam C.; Hefty, Marye G.; Ruiz, Kathi

    2013-11-01

    This report identifies the climate region of each county in the United States. The report is intended as an aid in helping builders to identify the appropriate climate designation for the counties in which they are building.

  14. Electrical Energy and Demand Savings from a Geothermal Heat Pump ESPC at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. Pre- and post-retrofit data were taken at 15-minute intervals on energy flows through the electrical distribution feeders that serve the family housing areas of the post. Fifteen-minute interval data were also taken on energy use from a sample of the residences. The analysis presented in this paper shows that for a typical meteorological year, the retrofits result in an electrical energy savings of approximately 25.6 million kWh, or 32.4% of the pre-retrofit electrical use in family housing. Peak electrical demand has also been reduced by about 6.8 MW, which is 40% of pre-retrofit peak demand. In addition, the retrofits save about 260,000 therms per year of natural gas. It should be noted that the energy savings presented in this document are the 'apparent' energy savings observed in the monitored data and are not to be mistaken for the 'contracted' energy savings used as the basis for payments. To determine the 'contracted' energy savings, the 'apparent' energy savings may require adjustments for such things as changes in indoor temperature performance criteri, addition of ceiling fans, and other factors.

  15. Investigation of Cooling and Dehumidification Energy Use and Indoor Thermal Conditions in Polk County Schools Permanent Replacement Classroom Buildings 

    E-Print Network [OSTI]

    Moyer, N. A.; Cummings, J. B.; Chasar, D.

    2002-01-01

    Increasing enrollment in grades K-12 coupled with the spiraling costs of construction has pushed school boards to develop more cost-effective classrooms, from the perspective of initial cost, longterm energy consumption, ...

  16. Health assessment for Cedartown Municipal Landfill NPL Site, Cedartown, Polk County, Georgia, Region 4. CERCLIS No. GAD980495402. Preliminary report

    SciTech Connect (OSTI)

    Not Available

    1990-08-08

    In compliance with the Comprehensive Environmental Response, Compensation, and Liability Act and the Resource Conservation and Recovery Act, as amended, the Agency for Toxic Substances and Disease Registry (ATSDR) has prepared Health Assessment reports for sites currently on, or proposed for, the National Priorities List. In the report, the presence and nature of health hazards at this site are assessed, and the public health implications specific to this site are evaluated. The Health Assessment is based on such factors as the nature, concentration, toxicity, and extent of contamination at the site; the existence of potential pathways for the human exposure; the size and nature of the community likely to be exposed; and any other information available.

  17. Tampa Electric Company Polk Power Station Unit Number 1. Annual report, January--December, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-08-01

    This report satisfies the requirements of Cooperative Agreement DE-FC21-91MC27363, novated as of March 5, 1992, to provide an annual update report on the year`s activities associated with Tampa Electric Company`s 250 MW IGCC demonstration project for the year 1993. Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Approximately 50% of the raw, hot syngas is cooled to 900 F and passed through a moving bed of zinc-based sorbent which removes sulfur containing compounds from the syngas. The remaining portion of the raw, hot syngas is cooled to 400 F for conventional acid gas removal. Sulfur-bearing compounds from both cleanup systems are sent to a conventional sulfuric acid plant to produce a marketable, high-purity sulfuric acid by-product. The cleaned medium-BTU syngas from these processes is routed to the combined cycle power generation system where it is mixed with air and burned in the combustion section of the combustion turbine. Heat is extracted from the expanded exhaust gases in a heat recovery steam generator (HRSG) to produce steam at three pressure levels for use throughout the integrated process. A highly modular, microprocessor-based distributed control system (DCS) is being developed to provide continuous and sequential control for most of the equipment on PPS-1.

  18. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM

    SciTech Connect (OSTI)

    Murphy, Mark B.

    1999-02-24

    The Nash Draw Brushy Canyon Pool in Eddy County New Mexico is a cost-shared field demonstration project in the US Department of Energy Class II Program. A major goal of the Class III Program is to stimulate the use of advanced technologies to increase ultimate recovery from slope-basin clastic reservoirs. Advanced characterization techniques are being used at the Nash Draw project to develop reservoir management strategies for optimizing oil recovery from this Delaware reservoir. Analysis, interpretation, and integration of recently acquired geologic, geophysical, and engineering data revealed that the initial reservoir characterization was too simplistic to capture the critical features of this complex formation. Contrary to the initial characterization, a new reservoir description evolved that provided sufficient detail regarding the complexity of the Brushy Canyon interval at Nash Draw. This new reservoir description is being used as a risk reduction tool to identify ''sweet spots'' for a development drilling program as well as to evaluate pressure maintenance strategies. The reservoir characterization, geological modeling, 3-D seismic interpretation, and simulation studies have provided a detailed model of the Brushy Canyon zones. This model was used to predict the success of different reservoir management scenarios and to aid in determining the most favorable combination of targeted drilling, pressure maintenance, well simulation, and well spacing to improve recovery from this reservoir.

  19. 2507 University Avenue Des Moines, Iowa 50311-4505

    E-Print Network [OSTI]

    Urness, Tim

    forums with Polk County Public Health, the local hospitals, local emergency responders, Polk County Emergency Management, and Iowa Department of Public Health

  20. The State of Our Health 2013: Key Health Indicators for Oregonians

    E-Print Network [OSTI]

    Chapman, Michael S.

    Tillamook Washington Yamhill Polk Benton Linn Lane DouglasCoos Curry Josephine Jackson Deschutes Je erson___________________________________________________________ 119 Multnomah County________________________________________________________ 123 Polk County

  1. Integrated Gasification Combined Cycle (IGCC) demonstration project, Polk Power Station -- Unit No. 1. Annual report, October 1993--September 1994

    SciTech Connect (OSTI)

    1995-05-01

    This describes the Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project which will use a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,300 tons per day of coal (dry basis) coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 Btu/scf (LHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product.

  2. Comparison of practical vertical ground heat exchanger sizing methods to a Fort Polk data/model benchmark

    SciTech Connect (OSTI)

    Thornton, J.W.; McDowell, T.P.; Hughes, P.J.

    1997-09-01

    The results of five practical vertical ground heat exchanger sizing programs are compared against a detailed simulation model that has been calibrated to monitored data taken from one military family housing unit at Fort Polk, Louisiana. The calibration of the detailed model to data is described in a companion paper. The assertion that the data/detailed model is a useful benchmark for practical sizing methods is based on this calibration. The results from the comparisons demonstrate the current level of agreement between vertical ground heat exchanger sizing methods in common use. It is recommended that the calibration and comparison exercise be repeated with data sets from additional sites in order to build confidence in the practical sizing methods.

  3. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM

    SciTech Connect (OSTI)

    Mark B. Murphy

    2005-09-30

    The Nash Draw Brushy Canyon Pool in Eddy County New Mexico was a cost-shared field demonstration project in the U.S. Department of Energy Class III Program. A major goal of the Class III Program was to stimulate the use of advanced technologies to increase ultimate recovery from slope-basin clastic reservoirs. Advanced characterization techniques were used at the Nash Draw Pool (NDP) project to develop reservoir management strategies for optimizing oil recovery from this Delaware reservoir. The objective of the project was to demonstrate that a development program, which was based on advanced reservoir management methods, could significantly improve oil recovery at the NDP. Initial goals were (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to other oil and gas producers. Analysis, interpretation, and integration of recently acquired geological, geophysical, and engineering data revealed that the initial reservoir characterization was too simplistic to capture the critical features of this complex formation. Contrary to the initial characterization, a new reservoir description evolved that provided sufficient detail regarding the complexity of the Brushy Canyon interval at Nash Draw. This new reservoir description was used as a risk reduction tool to identify 'sweet spots' for a development drilling program as well as to evaluate pressure maintenance strategies. The reservoir characterization, geological modeling, 3-D seismic interpretation, and simulation studies have provided a detailed model of the Brushy Canyon zones. This model was used to predict the success of different reservoir management scenarios and to aid in determining the most favorable combination of targeted drilling, pressure maintenance, well stimulation, and well spacing to improve recovery from this reservoir. An Advanced Log Analysis technique developed from the NDP project has proven useful in defining additional productive zones and refining completion techniques. This program proved to be especially helpful in locating and evaluating potential recompletion intervals, which has resulted in low development costs with only small incremental increases in lifting costs. To develop additional reserves at lower costs, zones behind pipe in existing wells were evaluated using techniques developed for the Brushy Canyon interval. These techniques were used to complete uphole zones in thirteen of the NDP wells. A total of 14 recompletions were done: four during 1999, four during 2000, two during 2001, and four during 2002-2003. These workovers added reserves of 332,304 barrels of oil (BO) and 640,363 MCFG (thousand cubic feet of gas) at an overall weighted average development cost of $1.87 per BOE (barrel of oil equivalent). A pressure maintenance pilot project in a developed area of the field was not conducted because the pilot area was pressure depleted, and the reservoir in that area was found to be compartmentalized and discontinuous. Economic analyses and simulation studies indicated that immiscible injection of lean hydrocarbon gas for pressure maintenance was not warranted at the NDP and would need to be considered for implementation in similar fields very soon after production has started. Simulation studies suggested that the injection of miscible carbon dioxide (CO{sub 2}) could recover significant quantities of oil at the NDP, but a source of low-cost CO{sub 2} was not available in the area. Results from the project indicated that further development will be under playa lakes and potash areas that were beyond the regions covered by well control and are not accessible with vertical wells. These areas, covered by 3-D seismic surveys that were obtained as part of the project, were accessed with combinations of deviated/horizontal wells. Three directional/horizontal wells have been drilled and completed to develop reserves under surface-restricted areas and potash mines. The third

  4. Daemen Alternative Energy/Geothermal Technologies Demonstration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Daemen Alternative EnergyGeothermal Technologies Demonstration Program Erie County Daemen Alternative EnergyGeothermal Technologies Demonstration Program Erie County Project...

  5. Taiwan Nantou County earthquake 0327 Taiwan Nantou County earthquake

    E-Print Network [OSTI]

    Chen, Sheng-Wei

    Taiwan Nantou County earthquake 20130327 1 #12;0327 Taiwan Nantou County earthquake Source, Intensity 5 #12;I II III IV V VI VII Intensity Shake map of the March 27 Earthquake The peak ground and Technology Center for Disaster Reduction (NCDR) #12;Earthquake Response and Evacuation are a Part of Students

  6. To appear as: Aerts, D., Bundervoet, S., Czachor, M., D'Hooghe, B., Gabora L. and Polk, P. (2010). On the foundations of the theory of evolution. In D. Aerts, B. D'Hooghe and N. Note (Eds.), Worldviews, Science and Us: Bridging

    E-Print Network [OSTI]

    Aerts, Diederik

    2010-01-01

    1 To appear as: Aerts, D., Bundervoet, S., Czachor, M., D'Hooghe, B., Gabora L. and Polk, P. (2010,1 , Bart D'Hooghe1 , Liane Gabora3,1 and Philip Polk4 Abstract In this paper we suggest an alternative

  7. Estimated Maintenance Cost Savings from a Geothermal Heat Pump Energy Savings Performance Contract at Fort Polk, LA

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    1997-06-01

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  8. Estimated maintenance cost savings from a geothermal heat pump energy savings performance contract at Fort Polk, Louisiana

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.

    1997-12-31

    At Fort Polk, Louisiana, the space-conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHPs) under an energy savings performance contract. At the same time, other efficiency measures, such as compact fluorescent lights, low-flow hot water outlets, and attic insulation, were installed. These retrofits were performed by an energy services company at no up-front cost to the Army. The company has also assumed responsibility for maintenance of all the equipment installed. In return, it receives a percentage of the energy and maintenance savings realized by the Army. In developing the energy savings performance contract, the Army estimated its pre-retrofit maintenance costs from bids received on a request for proposals. In this paper, a more rigorous cost estimate is developed, based on a survey of maintenance records for the pre-retrofit HVAC equipment. The reliability of the equipment is also estimated using an actuarial method to determine the number of units requiring replacement each year and the effect of these replacements on annual maintenance costs.

  9. Low-risk and cost-effective prior savings estimates for large-scale energy conservation projects in housing: Learning from the Fort Polk GHP project

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.; Thornton, J.W.

    1997-08-01

    Many opportunities exist for large-scale energy conservation projects in housing. Energy savings performance contracting (ESPC) is now receiving greater attention, as a means to implement such projects. This paper proposes an improved method for prior (to construction) savings estimates for these projects. The proposed approach to prior estimates is verified against data from Fort Polk, LA. In the course of evaluating the ESPC at Fort Polk, the authors have collected energy use data which allowed them to develop calibrated engineering models which accurately predict pre-retrofit energy consumption. They believe that such calibrated models could be used to provide much more accurate estimates of energy savings in retrofit projects. The improved savings estimating approach described here is based on an engineering model calibrated to field-collected data from the pre-retrofit period. A dynamic model of pre-retrofit energy use was developed for all housing and non-housing loads on a complete electrical feeder at Fort Polk. The model included the heat transfer characteristics of the buildings, the pre-retrofit air source heat pump, a hot water consumption model and a profile for electrical use by lights and other appliances. Energy consumption for all 200 apartments was totaled, and by adjusting thermostat setpoints and outdoor air infiltration parameters, the models were matched to field-collected energy consumption data for the entire feeder. The energy conservation measures were then implemented in the calibrated model: the air source heat pumps were replaced by geothermal heat pumps with desuperheaters; hot water loads were reduced to account for the low-flow shower heads; and lighting loads were reduced to account for fixture delamping and replacement with compact fluorescent lights. The analysis of pre- and post-retrofit data indicates that the retrofits have saved 30.3% of pre-retrofit electrical energy consumption on the feeder modeled in this paper.

  10. Electrical energy and demand savings from a geothermal heat pump energy savings performance contract at Ft. Polk, LA

    SciTech Connect (OSTI)

    Shonder, J.A.; Hughes, P.J.

    1997-06-01

    At Fort Polk, LA the space conditioning systems of an entire city (4,003 military family housing units) have been converted to geothermal heat pumps (GHP) under an energy savings performance contract. At the same time, other efficiency measures such as compact fluorescent lights (CFLs), low-flow hot water outlets, and attic insulation were installed. Pre- and post-retrofit data were taken at 15-minute intervals on energy flows through the electrical distribution feeders that serve the family housing areas of the post. 15-minute interval data was also taken on energy use from a sample of the residences. This paper summarizes the electrical energy and demand savings observed in this data. Analysis of feeder-level data shows that for a typical year, the project will result in a 25.6 million kWh savings in electrical energy use, or 32.4% of the pre-retrofit electrical consumption in family housing. Results from analysis of building-level data compare well with this figure. Analysis of feeder-level data also shows that the project has resulted in a reduction of peak electrical demand of 6,541 kW, which is 39.6% of the pre-retrofit peak electrical demand. In addition to these electrical savings, the facility is also saving an estimated 260,000 therms per year of natural gas. It should be noted that the energy savings presented in this document are the apparent energy savings observed in the monitored data, and are not to be confused with the contracted energy savings used as the basis for payments. To determine the contracted energy savings, the apparent energy savings may require adjustments for such things as changes in indoor temperature performance criteria, additions of ceiling fans, and other factors.

  11. SEARCH FOR UNDERGROUND OPENINGS FOR IN SITU TEST FACILITIES IN CRYSTALLINE ROCK

    E-Print Network [OSTI]

    Wallenberg, H.A.

    2010-01-01

    corner of Tennessee in Polk County in a topographic basinRiver Co. Boyd Mine, Tennessee, Polk Co. Brushy Creek Mine,Burra Burra Mine, Tennessee, Polk Co. Burro Chief Mine, New

  12. Extension Comings and Goings October 2011 1 Table of Contents

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    Extension Comings and Goings October 2011 1 Table of Contents October 2011 Polk County Master award in the Polk County Master Gardeners' Agri-Fest Program Wins International Award Polk County Master: The Business of Raising Children 3 Reading Garden Blooms at Newton Library 3 Polk Master Gardeners Shine

  13. Health of Older Californians: County Data Book

    E-Print Network [OSTI]

    Wallace, Steven P.; Pourat, Nadereh; Enriquez-Haass, Vilma; Sripipatana, Alek

    2003-01-01

    San Joaquin, Stanislaus, Tulare Central Coast Counties:Kings County (Kings and Tulare Counties combined) LakeCounty (see Lassen County) Tulare County (see Kings County)

  14. EA-1472: Commercial Demonstration fo the Low Nox Burner/Separated Over-Fire Air (LNB/SOFA) Integration System Emission Reduction Technology, Holcolm Station, Sunflower Electric Power Corporation Finnety County, Kansas

    Broader source: Energy.gov [DOE]

    The DOE has prepared an Environmental Assessment (EA), to analyze the potential impacts of the commercial application of the Low-NOx Burner/Separated Over-Fire Air (LNB/SOFA) integration system to achieve nitrogen oxide (NOx) emissions reduction at Sunflower’s Holcomb Unit No. 1 (Holcomb Station), located near Garden City, in Finney County, Kansas. The Holcomb Station would be modified in three distinct phases to demonstrate the synergistic effect of layering NOx control technologies.

  15. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect (OSTI)

    Mark B. Murphy

    2004-01-31

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  16. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect (OSTI)

    Mark B. Murphy

    2002-12-31

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  17. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect (OSTI)

    Mark B. Murphy

    2003-07-30

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  18. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect (OSTI)

    Mark B. Murphy

    2003-10-31

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  19. Counties with more than 500 alumni Broward 36,650

    E-Print Network [OSTI]

    Fernandez, Eduardo

    ,177 Okeechobee 392 Okaloosa 87 Nassau 56 Monroe 285 Martin 2,360 Marion 438 Manatee 278 Putnam 84 Polk 427,219 31,996 34,844 35,965 31% Pasco 181 193 201 214 225 245 35% Pinellas 520 532 559 558 604 665 28% Polk

  20. 2012 Headcount Enrollment Headcount Enrollment by Florida County of Residency

    E-Print Network [OSTI]

    Fernandez, Eduardo

    . Lucie 660 Osceola 79 Orange 420 Okeechobee 27 Martin 481 Manatee 87 Polk 121 Pinellas 259 Pasco 111 5 217% Pinellas 111 153 168 165 228 259 133% Polk 61 70 70 82 114 121 98% Putnam 3 1 1 3 4 4 33% St

  1. Suffolk County- LEED Program for County Construction

    Broader source: Energy.gov [DOE]

    In 2006, the Suffolk County Legislature enacted Resolution No. 126-2006, creating the Leadership in Energy and Environment Design (LEED) Program for county construction projects. The program...

  2. ADVANCED OIL RECOVERY TECHNOLOGIES FOR IMPROVED RECOVERY FROM SLOPE BASIN CLASTIC RESERVOIRS, NASH DRAW BRUSHY CANYON POOL, EDDY COUNTY, NM

    SciTech Connect (OSTI)

    Mark B. Murphy

    2002-09-30

    The overall objective of this project is to demonstrate that a development program-based on advanced reservoir management methods-can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry. This is the twenty-eighth quarterly progress report on the project. Results obtained to date are summarized.

  3. Improved Oil Recovery from Upper Jurassic Smackover Carbonates through the Application of Advanced Technologies at Womack Hill Oil Field, Choctaw and Clarke Counties, Eastern Gulf Coastal Plain

    SciTech Connect (OSTI)

    Ernest A. Mancini

    2003-12-31

    Pruet Production Co. and the Center for Sedimentary Basin Studies at the University of Alabama, in cooperation with Texas A&M University, Mississippi State University, University of Mississippi, and Wayne Stafford and Associates proposed a three-phase, focused, comprehensive, integrated and multidisciplinary study of Upper Jurassic Smackover carbonates (Class II Reservoir), involving reservoir characterization and 3-D modeling (Phase I) and a field demonstration project (Phases II and III) at Womack Hill Field Unit, Choctaw and Clarke Counties, Alabama, eastern Gulf Coastal Plain. Phase I of the project has been completed. The principal objectives of the project are: increasing the productivity and profitability of the Womack Hill Field Unit, thereby extending the economic life of this Class II Reservoir and transferring effectively and in a timely manner the knowledge gained and technology developed from this project to producers who are operating other domestic fields with Class II Reservoirs. The major tasks of the project included reservoir characterization, recovery technology analysis, recovery technology evaluation, and the decision to implement a demonstration project. Reservoir characterization consisted of geoscientific reservoir characterization, petrophysical and engineering property characterization, microbial characterization, and integration of the characterization data. Recovery technology analysis included 3-D geologic modeling, reservoir simulation, and microbial core experiments. Recovery technology evaluation consisted of acquiring and evaluating new high quality 2-D seismic data, evaluating the existing pressure maintenance project in the Womack Hill Field Unit, and evaluating the concept of an immobilized enzyme technology project for the Womack Hill Field Unit. The decision to implement a demonstration project essentially resulted in the decision on whether to conduct an infill drilling project in Womack Hill Field. Reservoir performance, multiwell productivity analysis, and reservoir simulation studies indicate that water injection continues to provide stable support to maintain production from wells in the western unitized area of the field and that the strong water drive present in the eastern area of the field is adequate to sustain production from this part of the field. Although the results from the microbial characterization and microbial core experiments are very promising, it is recommended that an immobilized enzyme technology project not be implemented in the Womack Hill Field Unit until live (freshly taken and properly preserved) cores from the Smackover reservoir in the field are acquired to confirm the microbial core experiments to date. From 3-D geologic modeling, reservoir performance analysis, and reservoir simulation, four areas in the Womack Hill Field were identified as prospective infill drilling sites to recover undrained oil from the field. It was determined that the two areas in the unit area probably can be effectively drained by perforating higher zones in the Smackover reservoir in currently producing wells. The two areas in the eastern (non-unitized) part of the field require the drilling of new wells. The successful drilling and testing of a well in 2003 by J. R. Pounds, Inc. has proven the oil potential of the easternmost site in the non-unitized part of the field. Pruet Production Co. acquired new 2-D seismic data to evaluate the oil potential of the westernmost site. Because of the effects of a fault shadow from the major fault bounding the southern border of the Womack Hill Field, it is difficult to evaluate conclusively this potential drill site. Pruet Production Co. has decided not to drill this new well at this time and to further evaluate the new 2-D seismic profiles after these data have been processed using a pre-stack migration technique. Pruet Production Co. has elected not to continue into Phase II of this project because they are not prepared to make a proposal to the other mineral interest owners regarding the drilling of new wells as part of an infil

  4. Improved Oil Recovery from Upper Jurassic Smackover Carbonates through the Application of Advanced Technologies at Womack Hill Oil Field, Choctaw and Clarke Counties, Eastern Gulf Costal Plain

    SciTech Connect (OSTI)

    Ernest A. Mancini

    2006-05-31

    Pruet Production Co. and the Center for Sedimentary Basin Studies at the University of Alabama, in cooperation with Texas A&M University, Mississippi State University, University of Mississippi, and Wayne Stafford and Associates proposed a three-phase, focused, comprehensive, integrated and multidisciplinary study of Upper Jurassic Smackover carbonates (Class II Reservoir), involving reservoir characterization and 3-D modeling (Phase I) and a field demonstration project (Phases II and III) at Womack Hill Field Unit, Choctaw and Clarke Counties, Alabama, eastern Gulf Coastal Plain. Phase I of the project has been completed. The principal objectives of the project are: increasing the productivity and profitability of the Womack Hill Field Unit, thereby extending the economic life of this Class II Reservoir and transferring effectively and in a timely manner the knowledge gained and technology developed from this project to producers who are operating other domestic fields with Class II Reservoirs. The major tasks of the project included reservoir characterization, recovery technology analysis, recovery technology evaluation, and the decision to implement a demonstration project. Reservoir characterization consisted of geoscientific reservoir characterization, petrophysical and engineering property characterization, microbial characterization, and integration of the characterization data. Recovery technology analysis included 3-D geologic modeling, reservoir simulation, and microbial core experiments. Recovery technology evaluation consisted of acquiring and evaluating new high quality 2-D seismic data, evaluating the existing pressure maintenance project in the Womack Hill Field Unit, and evaluating the concept of an immobilized enzyme technology project for the Womack Hill Field Unit. The decision to implement a demonstration project essentially resulted in the decision on whether to conduct an infill drilling project in Womack Hill Field. Reservoir performance, multiwell productivity analysis, and reservoir simulation studies indicate that water injection continues to provide stable support to maintain production from wells in the western unitized area of the field and that the strong water drive present in the eastern area of the field is adequate to sustain production from this part of the field. Although the results from the microbial characterization and microbial core experiments are very promising, it is recommended that an immobilized enzyme technology project not be implemented in the Womack Hill Field Unit until live (freshly taken and properly preserved) cores from the Smackover reservoir in the field are acquired to confirm the microbial core experiments to date. From 3-D geologic modeling, reservoir performance analysis, and reservoir simulation, four areas in the Womack Hill Field were identified as prospective infill drilling sites to recover undrained oil from the field. It was determined that the two areas in the unit area probably can be effectively drained by perforating higher zones in the Smackover reservoir in currently producing wells. The two areas in the eastern (non-unitized) part of the field require the drilling of new wells. The successful drilling and testing of a well in 2003 by J. R. Pounds, Inc. has proven the oil potential of the easternmost site in the non-unitized part of the field. Pruet Production Co. acquired new 2-D seismic data to evaluate the oil potential of the westernmost site. Because of the effects of a fault shadow from the major fault bounding the southern border of the Womack Hill Field, it is difficult to evaluate conclusively this potential drill site. Pruet Production Co. has decided not to drill this new well at this time and to further evaluate the new 2-D seismic profiles after these data have been processed using a pre-stack migration technique. Pruet Production Co. has elected not to continue into Phase II of this project because they are not prepared to make a proposal to the other mineral interest owners regarding the drilling of new wells as part of an infil

  5. Low-Risk and Cost-Effective Prior Savings Estimates for Large-Scale Energy Conservation Projects in Housing: Learning from the Fort Polk GHP Project

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick; Thornton, Jeff W.

    1997-08-01

    Many opportunities exist for large-scale energy conservation projects in housing: military housing, federally-subsidized low-income housing, and planned communities (condominiums, townhomes, senior centers) to name a few. Energy savings performance contracting (ESPC) is now receiving greater attention, as a means to implement such projects. This paper proposes an improved method for prior (to construction) savings estimates for these projects. More accurate prior estimates reduce project risk, decrease financing costs, and help avoid post-construction legal disputes over performance contract baseline adjustments. The proposed approach to prior estimates is verified against data from Fort Polk, LA. In the course of evaluating the ESPC at Fort Polk, Louisiana, we have collected energy use data - both at the electrical feeder level and at the level of individual residences - which allowed us to develop calibrated engineering models which accurately predict pre-retrofit energy consumption. We believe that such calibrated models could be used to provide much more accurate estimates of energy savings in retrofit projects, particularly in cases where the energy consumption of large populations of housing can be captured on one or a few meters. The improved savings estimating approach described here is based on an engineering model calibrated to field-collected data from the pre-retrofit period. A dynamic model of pre-retrofit energy use was developed for all housing and non-housing loads on a complete electrical feeder at Fort Polk. The feeder serves 46 buildings containing a total of 200 individual apartments. Of the 46 buildings, there are three unique types, and among these types the only difference is compass orientation. The model included the heat transfer characteristics of the buildings, the pre-retrofit air source heat pump, a hot water consumption model and a profile for electrical use by lights and other appliances. Energy consumption for all 200 apartments was totaled, and by adjusting thermostat setpoints and outdoor air infiltration parameters, the models were matched to field-collected energy consumption data for the entire feeder. The energy conservation measures were then implemented in the calibrated model: the air source heat pumps were replaced by geothermal heat pumps (GHPs) with desuperheaters; hot water loads were reduced to account for the low-flow shower heads; and lighting loads were reduced to account for fixture delamping and replacement with compact fluorescent lights (CFLs). Our analysis of pre- and post-retrofit data (Shonder and Hughes, 1997) indicates that the retrofits have saved 30.3% of pre-retrofit electrical energy consumption on the feeder modeled in this paper. Using the method outlined, we have been able to predict this savings within 0.1% of its measured value, using only pre-construction energy consumption data, and data from one pilot test site. It is well-known that predictions of savings from energy conservation programs are often optimistic, especially in the case of residential retrofits. Fels and keating (1993) cite several examples of programs which achieved as little as 20% of the predicted energy savings. Factors which influence the sometimes large discrepancies between actual and predicted savings include changes in occupancy, take-back effects (in which more efficient system operation leads occupants to choose higher levels of comfort), and changes in base energy use (e.g. through purchase of additional appliances such as washing machines and clothes dryers). An even larger factor, perhaps, is the inaccuracy inherent in the engineering models (BLAST, DOE-2, etc.) commonly used to estimate building energy consumption, if these models are not first calibrated to site-monitored data. For example, prior estimates of base-wide savings from the Fort Polk ESPC were on the order of 40% of pre-retrofit electrical use; our analysis has shown the true savings for the entire project (which includes 16 separate electrical feeders) to be about 32%. It should be noted that the retrofits ca

  6. A Michigan County Unearths Savings with Geothermal Energy | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    chose geothermal energy after it found success using the same technology at the 63rd District Courthouse -- the only other county building that uses a renewable energy heating...

  7. San Diego County- Design Standards for County Facilities

    Broader source: Energy.gov [DOE]

    The San Diego County Board of Supervisors established design standards for county facilities and property. Among other requirements,  the policy requires that all new county buildings or major...

  8. Extension Comings and Goings From the Office of the Dean for Extension

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    Gardeners Harvest Statewide Award Polk County Ag Tour Florida House Learning Center Featured on FEMA Web/1/2006 Brantley Ivey - EA I ­ Livestock - Polk County - 12/12/2006 Vera Gasparini - EA II Regional Specialized Com

  9. UF/IFAS Nutrient Management Series: Computational Tools for Field Implementation of the Florida

    E-Print Network [OSTI]

    Ma, Lena

    of the Florida Phosphorus Index ­ Polk County Florida 1 G.W. Hurt, R.S. Mylavarapu and S.P. Boetger2 1.............................................................................................. 3 FIELD EVALUATION AND IMPLEMENTATION FOR POLK COUNTY.............................. 4 Phosphorus

  10. Dutchess County Resource Recovery Task Force report: Dutchess County Pyrolysis Program

    SciTech Connect (OSTI)

    None

    1980-07-01

    Dutchess County initiated development of a long-range master plan for Solid Waste Management in 1971. The plan included development of a resource recovery facility to service the municipalities in the County population center. Based on early recommendations, a pyrolysis facility employing Purox technology was to be implemented. A feasibility study, paid for by County funds was completed in 1975. The study provided siting recommendations, estimation of available waste, and preliminary facility design. Because of various considerations, the project was not developed. Under the Department of Energy grant, the County reassessed the feasibility of a resource recovery facility, with emphasis on confirming previous conclusions supporting the Purox technology, waste availability, energy recovery and sale and siting of the plant. The conclusions reached in the new study were: a resource recovery facility is feasible for the County; sufficient waste for such a facility is available and subject to control; While Purox technology was feasible it is not the most appropriate available technoloy for the County; that mass burning with steam recovery is the most appropriate technology; and that resource recovery while presently more expensive than landfilling, represents the only cost effective, energy efficient, and environmentally sound way to handle the solid waste problem in the County.

  11. DeKalb County/Metropolitan Atlanta Alternative Fuel and Advanced...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    60tifrancis2012o.pdf More Documents & Publications DeKalb CountyMetropolitan Atlanta Alternative Fuel and Advanced Technology Vehicle Project DeKalb CountyMetropolitan...

  12. DeKalb County/Metropolitan Atlanta Alternative Fuel and Advanced...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    vt060francis2010p.pdf More Documents & Publications DeKalb CountyMetropolitan Atlanta Alternative Fuel and Advanced Technology Vehicle Project DeKalb CountyMetropolitan...

  13. DeKalb County/Metropolitan Atlanta Alternative Fuel and Advanced...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    60tifrancis2011p.pdf More Documents & Publications DeKalb CountyMetropolitan Atlanta Alternative Fuel and Advanced Technology Vehicle Project DeKalb CountyMetropolitan...

  14. Broward County- Green Building Policy

    Broader source: Energy.gov [DOE]

    In October 2008, Board of County Commissioners of Broward County passed a resolution creating the County Green Building Policy. All new County-owned and operated buildings must achieve a minimum...

  15. Regional Lead Agents and County Coordinators 2011 RESPONSIBILITY NAME COUNTY

    E-Print Network [OSTI]

    Bolding, M. Chad

    #12;Regional Lead Agents and County Coordinators 2011 RESPONSIBILITY NAME COUNTY REGION 1 Regional Lead Millie Davenport HGIC County Coordinator Matt Burns Pickens County Coordinator Marty Watt Anderson County Coordinator Morris Warner Oconee REGION 2 Regional Lead Danny Howard Greenville County Coordinator

  16. U of M Crookston Campus EUpdate an internal administrative news digest

    E-Print Network [OSTI]

    Minnesota, University of

    , and Polk County Sheriff's Office Active Shooter Training, Thursday, June 13 ­ 8 a.m. to 7 p.m., locations across campus Relay for Life Sponsored by West Polk County Chapter of the American Cancer Society Student Center UMC Emergency Management, Crookston Police Department, and Polk County Sheriff's Office

  17. EMERGENCY NUMBERS THAT MAYADDRESS MENTAL HEALTH RELATED EMERGENCIES

    E-Print Network [OSTI]

    Minnesota, University of

    communities Crookston Police Dept. 911 & 281-3111 (non- emergencies) CPD Crookston & UMC Polk County Sheriff 218-281-0431 Sheriff's Office Polk County Fosston Police Dept 218-435-6611 Fosston Erskine Police Dept-773-1104 East Grand Forks Polk County Social Services Adult and Child Protection 281-3127 M-F after hours call

  18. USING RECENT ADVANCES IN 2D SEISMIC TECHNOLOGY AND SURFACE GEOCHEMISTRY TO ECONOMICALLY REDEVELOP A SHALLOW SHELF CARBONATE RESERVOIR: VERNON FIELD, ISABELLA COUNTY, MI.

    SciTech Connect (OSTI)

    James R. Wood; T.J. Bornhorst; William B. Harrison; W. Quinlan

    2002-04-01

    The fault study continues to find more faults and develop new techniques to visualize them. Data from the Dundee Formation has been used to document 11 major faults in the Michigan Basin which have now been verified using data from other horizons. These faults control the locations of many of the large anticlinal structures in the Michigan Basin and likely controlled fluid movements as well. The surface geochemistry program is also moving along well with emphasis on measuring samples collected last sampling season. The new GC laboratory is now functional and has been fully staffed as of December. The annual project review was held March 7-9 in Tampa, Florida. Contracts are being prepared for drilling the Bower's prospects in Isabella County, Michigan, this spring or summer. A request was made to extend the scope of the project to include the Willison Basin. A demonstration well has been suggested in Burke County, N. Dakota, following a review of 2D seismic and surface geochem. A 3D seismic survey is scheduled for the prospect.

  19. USING RECENT ADVANCES IN 2D SEISMIC TECHNOLOGY AND SURFACE GEOCHEMISTRY TO ECONOMICALLY REDEVELOP A SHALLOW SHELF CARBONATE RESERVOIR: VERNON FIELD, ISABELLA COUNTY, MI

    SciTech Connect (OSTI)

    James R. Wood; W. Quinlan

    2003-01-01

    Presented in this quarterly report is the Case History and Well Summary for the Vernon Field demonstration project in Isabella County, Michigan. This new case history and well summary format organizes and presents the technical and historical details of the Vernon Field demonstration, as well as the field demonstration results and the applicability of these results to other demonstration projects. This format could be duplicated for other demonstration projects and will be used on all subsequent field demonstrations as they near completion. Planning for the annual project meeting in Tampa, Florida has begun. This meeting will be held March 7-9, 2003 at the same site as the last three meetings. The goals of this project were to: (1) test the use of multi-lateral wells to recover bypassed hydrocarbons and (2) to access the potential of using surface geochemistry to reduce drilling risk. Two new demonstration wells, the State-Smock and the Bowers 4-25, were drilled to test the Dundee Formation at Vernon Field for bypassed oil. Neither well was commercial, although both produced hydrocarbon shows. An extensive geochemical survey in the vicinity of Vernon Field, covering much of Isabella County, has produced a base map for interpretation of anomalies in Michigan. Several potential new anomalies were discovered that could be further investigated.

  20. County Wind Ordinance Standards

    Broader source: Energy.gov [DOE]

    Assembly Bill 45 of 2009 authorized counties to adopt ordinances to provide for the installation of small wind systems (50 kW or smaller) outside urbanized areas but within the county's...

  1. Balance : Lancaster County's tragedy

    E-Print Network [OSTI]

    Gingrich, Valerie (Valerie J.)

    2007-01-01

    Lancaster County, Pennsylvania residents are proud of their agricultural heritage. They do not want to see their farmland disappear. But the County continues to be developed into residential subdivisions. This thesis ...

  2. Estimating the Energy, Demand and Cost Savings from a Geothermal Heat Pump ESPC Project at Fort Polk, LA Through Utility Bill Analysis.

    SciTech Connect (OSTI)

    Shonder, John A; Hughes, Patrick

    2006-01-01

    Energy savings performance contracts (ESPCs) are a method of financing energy conservation projects using the energy cost savings generated by the conservation measures themselves. Ideally, reduced energy costs are visible as reduced utility bills, but in fact this is not always the case. On large military bases, for example, a single electric meter typically covers hundreds of individual buildings. Savings from an ESPC involving only a small number of these buildings will have little effect on the overall utility bill. In fact, changes in mission, occupancy, and energy prices could cause substantial increases in utility bills. For this reason, other, more practical, methods have been developed to measure and verify savings in ESPC projects. Nevertheless, increasing utility bills--when ESPCs are expected to be reducing them--are problematic and can lead some observers to question whether savings are actually being achieved. In this paper, the authors use utility bill analysis to determine energy, demand, and cost savings from an ESPC project that installed geothermal heat pumps in the family housing areas of the military base at Fort Polk, Louisiana. The savings estimates for the first year after the retrofits were found to be in substantial agreement with previous estimates that were based on submetered data. However, the utility bills also show that electrical use tended to increase as time went on. Since other data show that the energy use in family housing has remained about the same over the period, the authors conclude that the savings from the ESPC have persisted, and increases in electrical use must be due to loads unassociated with family housing. This shows that under certain circumstances, and with the proper analysis, utility bills can be used to estimate savings from ESPC projects. However, these circumstances are rare and over time the comparison may be invalidated by increases in energy use in areas unaffected by the ESPC.

  3. Kiowa County Commons Building

    Office of Energy Efficiency and Renewable Energy (EERE)

    This poster describes the energy efficiency features and sustainable materials used in the Kiowa County Commons Building in Greensburg, Kansas.

  4. Technolog

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    focuses on multi-scale, multiphysics approaches to understanding natural systems, "engineering the earth" with sensing and drilling technologies and characterizing geomaterials...

  5. USING RECENT ADVANCES IN 2D SEISMIC TECHNOLOGY AND SURFACE GEOCHEMISTRY TO ECONOMICALLY REDEVELOP A SHALLOW SHELF CARBONATE RESERVOIR: VERNON FIELD, ISABELLA COUNTY, MI.

    SciTech Connect (OSTI)

    James R. Wood; T.J. Bornhorst; S.D. Chittick; William B. Harrison; W. Quinlan

    2002-01-01

    In this reporting period, we extended the fault study to include more faults and developed new techniques to visualize the faults. We now have used data from the Dundee Formation to document 11 major faults in the Michigan Basin and are in the process of reviewing data from other horizons. These faults appear to control the locations of many of the large anticlinal structures in the Michigan Basin and likely controlled fluid movements as well. The surface geochemistry program is also moving along well with emphasis on measuring samples collected last sampling season. The new laboratory is now functional and has been fully staffed as of December. The annual project review has been set for March 7-9 in Tampa, Florida. Contracts are being prepared for drilling the Bower's prospects in Isabella County, Michigan, this spring or summer.

  6. USING RECENT ADVANCES IN 2D SEISMIC TECHNOLOGY AND SURFACE GEOCHEMISTRY TO ECONOMICALLY REDEVELOP A SHALLOW SHELF CARBONATE RESERVOIR: VERNON FIELD, ISABELLA COUNTY, MI

    SciTech Connect (OSTI)

    James R. Wood; W. Quinlan

    2003-04-01

    The principal objective of the study was to test a new analytical technique, Solid-Phase Microextraction (SPME), for detecting trace amounts of light hydrocarbons in pore gases as a means of reducing risk in hydrocarbon exploration and production. This involved measuring the effectiveness of SPME to extract hydrocarbons under controlled conditions in the laboratory. As part of the study, a field demonstration was undertaken to assess the validity and usefulness of the laboratory results. Presented in this quarterly report is the condensed version of the Case History and Well Summary for the Bear Lake area in Manistee County, Michigan. The full version will be in the annual report. The condensed case history presents the important technical details regarding the geochemistry and horizontal lateral for Bear Lake, as well as the field demonstration results and the applicability of these results to other demonstration projects. This format could be duplicated for other demonstration projects and will be used on all subsequent field demonstrations as they near completion.

  7. Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar Fuel ProductionRecoverable15/2008Technologies Technologies

  8. Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired Solar FuelTechnology /newsroom/_assets/images/s-icon.png Technology

  9. King County Metro Transit

    SciTech Connect (OSTI)

    Not Available

    2004-12-01

    Fact sheet describes the National Renewable Energy Laboratory's evaluation of King County Metro's articulated hybrid electric transit buses with Allison electric drives.

  10. 2015 South Central Florida Pesticide Training & Testing Schedule

    E-Print Network [OSTI]

    Ma, Lena

    ://multicountycommhort.eventbrite.com/ ··········································· Polk County Extension Mary Beth Henry 1702 Highway 17 South Bartow, FL 33830 863-519-1049 mbhenry@ufl.edu http://polk.ifas.ufl.edu/AG_Safety/events/ index Categories: All categories expect Pest Control Operator (PCO) & Limited Polk County Extension Office Exam

  11. Beef Forage Range Practices in South Florida

    E-Print Network [OSTI]

    Ma, Lena

    sent through the South Florida Beef-Forage Group; Bridget Carlisle, Extension Agent II, UF/IFAS/Polk, Hendry, Hillsborough, Lee, Indian River, Manatee, Martin, Okeechobee, Polk, and Sarasota counties. ABOUT

  12. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III

    SciTech Connect (OSTI)

    Murphy, Mark B.

    2000-10-25

    The Nash Draw Brushy Canyon Pool (NDP) is southeast New Mexico is one of the nine projects selected in 1995 by the U.S. Department of Energy (DOE) for participation in the Class III Reservoir Field Demonstration Program. The goals of the DOE cost-shared Class Program are to: (1) extend economic production, (2) increase ultimate recovery, and (3) broaden information exchange and technology application. Reservoirs in the Class III Program are focused on slope-basin and deep-basin clastic depositional types.

  13. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III

    SciTech Connect (OSTI)

    Murphy, Mark B.

    2002-01-16

    The overall objective of this project was to demonstrate that a development program-based on advanced reservoir management methods-can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan included developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals were (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  14. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico

    SciTech Connect (OSTI)

    Murphy, Mark B.

    1999-11-01

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  15. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, New Mexico, Class III

    SciTech Connect (OSTI)

    Murphy, Michael B.

    2002-02-21

    The overall objective of this project is to demonstrate that a development program based on advanced reservoir management methods can significantly improve oil recovery at the Nash Draw Pool (NDP). The plan includes developing a control area using standard reservoir management techniques and comparing its performance to an area developed using advanced reservoir management methods. Specific goals are (1) to demonstrate that an advanced development drilling and pressure maintenance program can significantly improve oil recovery compared to existing technology applications and (2) to transfer these advanced methodologies to oil and gas producers in the Permian Basin and elsewhere throughout the U.S. oil and gas industry.

  16. Technologies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With U.S. CoalMexico IndependentMatter and Technologies R&D

  17. Advanced oil recovery technologies for improved recovery from slope basin clastic reservoirs, Nash Draw Brushy Canyon Pool, Eddy County, NM. Quarterly technical progress report

    SciTech Connect (OSTI)

    Murphy, M.B.

    1996-04-22

    The overall objective of this project is to demonstrate that development program based on advanced reservoir management methods can significantly improve oil recovery. The demonstration plan includes developing a control area using standard reservoir management techniques and comparing the performance of the control area with an area developed using advanced reservoir management methods. specific goals to attain the objective are (1) to demonstrate that development drilling program and pressure maintenance program, based on advanced reservoir management methods , can significantly improve oil recovery compared with existing technology applications, and (2) to transfer the advanced methodologies to oil and gas producers in the Permian Basin and elsewhere in the US oil and gas industry. This is the second quarterly progress report on the project. Results obtained to date are summarized.

  18. Costilla County Biodiesel Pilot Project

    SciTech Connect (OSTI)

    Doon, Ben; Quintana, Dan

    2011-08-25

    The Costilla County Biodiesel Pilot Project has demonstrated the compatibility of biodiesel technology and economics on a local scale. The project has been committed to making homegrown biodiesel a viable form of community economic development. The project has benefited by reducing risks by building the facility gradually and avoiding large initial outlays of money for facilities and technologies. A primary advantage of this type of community-scale biodiesel production is that it allows for a relatively independent, local solution to fuel production. Successfully using locally sourced feedstocks and putting the fuel into local use emphasizes the feasibility of different business models under the biodiesel tent and that there is more than just a one size fits all template for successful biodiesel production.

  19. Harris County- Green Building Policy for County Buildings

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Harris County Facilities and Property Management (FPM) Division also requires all county buildings to meet minimum energy efficiency and sustainability measures, as described in the Best Gree...

  20. Walton County Coastal Storm Damage Reduction Project Walton County, FL

    E-Print Network [OSTI]

    US Army Corps of Engineers

    to reduce coastal storm damages by constructing berms and dunes along 18.8 miles of Walton County shoreline;vegetation and replacement of dune walkover structures as required. Material for the berm and duneWalton County Coastal Storm Damage Reduction Project Walton County, FL 13 December 2012 ABSTRACT

  1. Taiwan Nantou County earthquake 0327 Taiwan Nantou County earthquake

    E-Print Network [OSTI]

    Taiwan Nantou County earthquake 20130327 1 #12;0327 Taiwan Nantou County earthquake Source; Highway and railway in the strong shaking area Highway #3 Taiwan High Speed Rail Taiwan Railway Epicenter before the earthquake hits. A 6-intensity earthquake with epicenter at Nantou County struck Taiwan at 10

  2. San Diego County- Solar Regulations

    Broader source: Energy.gov [DOE]

    The County of San Diego has established zoning guidelines for solar electric systems of varying sizes in the unincorporated areas of San Diego County. Photovoltaic (PV) systems which have their...

  3. Riverside County- Sustainable Building Policy

    Broader source: Energy.gov [DOE]

    In February 2009, the County of Riverside Board of Supervisors adopted Policy Number H-29, creating the Sustainable Building Policy. The Policy requires that all new county building projects...

  4. San Diego County- Wind Regulations

    Office of Energy Efficiency and Renewable Energy (EERE)

    The County of San Diego has established zoning guidelines for wind turbine systems of varying sizes in the unincorporated areas of San Diego County. Wind turbine systems can be classified as small,...

  5. Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project

    SciTech Connect (OSTI)

    Fred Mitlitsky; Sara Mulhauser; David Chien; Deepak Shukla; David Weingaertner

    2009-11-14

    The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

  6. Snohomish County Biodiesel Project

    SciTech Connect (OSTI)

    Terrill Chang; Deanna Carveth

    2010-02-01

    Snohomish County in western Washington State began converting its vehicle fleet to use a blend of biodiesel and petroleum diesel in 2005. As prices for biodiesel rose due to increased demand for this cleaner-burning fuel, Snohomish County looked to its farmers to ���¢��������grow���¢������� this fuel locally. Suitable seed crops that can be crushed to extract oil for use as biodiesel feedstock include canola, mustard, and camelina. The residue, or mash, has high value as an animal feed. County farmers began with 52 acres of canola and mustard crops in 2006, increasing to 250 acres and 356 tons in 2008. In 2009, this number decreased to about 150 acres and 300 tons due to increased price for mustard seed.

  7. Orange County Government Solar Demonstration and Research Facility

    SciTech Connect (OSTI)

    Parker, Renee; Cunniff, Lori

    2015-05-12

    Orange County Florida completed the construction of a 20 kilowatt Solar Demonstration and Research Facility in March 2015. The system was constructed at the Orange County/University of Florida Cooperative Extension Center whose electric service address is 6021 South Conway Road, Orlando, Florida 32802. The Solar Demonstration and Research Facility is comprised of 72 polycrystalline photovoltaic modules and 3 inverters which convert direct current from the solar panels to alternating current electricity. Each module produces 270 watts of direct current power, for a total canopy production of just under 20,000 watts. The solar modules were installed with a fixed tilt of 5 degrees and face south, toward the equator to maximize the amount of sunlight captures. Each year, the electricity generated by the solar array will help eliminate 20 metric tons of carbon dioxide emissions as well as provide covered parking for staff and visitors vehicles. The solar array is expected to generate 27,000 kilowatt hours of electricity annually equating to an estimated $266 savings in the monthly electric bill, or $3,180 annually for the Orange County/University of Florida Cooperative Extension Center. In addition to reducing the electric bill for the Extension Center, Orange County’s solar array also takes advantage of a rebate incentive offered by the local utility, Orlando Utility Commission, which provided a meter that measures the amount of power produced by the solar array. The local utility company’s Solar Photovoltaic Production Incentive will pay Orange County $0.05 per kilowatt hour for the power that is produced by the solar array. This incentive is provided in addition to Net Metering benefits, which is an effort to promote the use of clean, renewable energy on the electric grid. The Photovoltaic Solar Demonstration and Research Facility also serves an educational tool to the public; the solar array is tied directly into a data logger that provides real time power generation accessible for public viewing on an interactive kiosk located in the Orange County/University of Florida Cooperative Extension Center’s lobby where visitors can review “real time” power generation, cost savings and environmental benefits of the system. Site commissioning with the software program was delayed due to Internal Security Software issues within Orange County that needed to be resolved, therefore the “real time” capture of the production data for the solar array using the software program commenced on May 1, 2015. In addition an educational flyer was developed and is available in the Orange County Education Center’s main lobby. The project completed under this grant award assisted Orange County in demonstrating leadership by installing the application of a renewable energy technology combined with energy efficiency measures; resulting in reduced energy costs for the Orange County University of Florida Cooperative Extension Center, and helping Orange County citizens and visitors move towards the goals of greater energy independence and climate protection. The addition of the new Solar Demonstration and Research Facility has advanced the Orange County/University of Florida Cooperative Extension Center’s mission of extending, educating and providing research-based information to residents and visitors of Orange County by demonstrating the application of renewable energy technology combined with energy efficiency measures; resulting in reduced energy costs, and helping Orange County move towards the goal of greater energy independence and climate protection. In 2014, the Orange County Cooperative Extension Center hosted nearly 10,800 visitors to their on-site Exploration Gardens plus 12,686 walk-in visitors to their office plant clinic and other services. The Education Center held 2,217 educational events that were attended by 46,434 adults and youth, but about half of those events occurred off-site. Based on the visitation numbers in 2014 the Orange County Cooperative Extension Center Education is a vital partner to Orange County’s

  8. Santa Clara County- Zoning Ordinance

    Broader source: Energy.gov [DOE]

    Santa Clara County's Zoning Ordinance includes standards for wind and solar structures for residential, agricultural, and commercial uses.

  9. San Diego County Reservation

    E-Print Network [OSTI]

    Laughlin, Robert B.

    San Diego County Brenda Pisgah Iron Mountain Riverside East Imperial East Morongo Reservation Colorado River Reservation San Pasqual Reservation Santa Ysabel Reservation Torres-Martinez Reservation) Reservation 60 95 95 95 115 San Diego Banning Yucca Valley Twentynine Palms Desert Hot Springs Palm Springs

  10. Dayao County Yupao River BasDayao County Yupao River Basin Hydro...

    Open Energy Info (EERE)

    Dayao County Yupao River BasDayao County Yupao River Basin Hydro electricity Development Co Ltd in Jump to: navigation, search Name: Dayao County Yupao River BasDayao County Yupao...

  11. An Archaeological Survey for the Buffalo Springs Project in Montgomery County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-15

    An archaeological survey was conducted at a 3-acre site in Montgomery County, Texas by Brazos Valley Research Associates (BVRA) on February 17, 2005 for LEFCO Environmental Technology, Inc. This tract occupies the floodplain of Town Creek within a...

  12. EIS-0318: Kentucky Pioneer Integrated Gasification Combined Cycle (IGCC) Demonstration Project, Trapp, Kentucky (Clark County)

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to provide cost-shared financial support for The Kentucky Pioneer IGCC Demonstration Project, an electrical power station demonstrating use of a Clean Coal Technology in Clark County, Kentucky.

  13. San Jacinto County Jail Building 

    E-Print Network [OSTI]

    Raiford Stripling Associates, Inc.; Stripling, Raiford L.

    1973-01-01

    and part of the Houston metropolitan area. The County is bisected by the Trinity River from North to South and US Highway 90 from East to West. The County has a very strategic location, along the Trinity River, allowing access to the Port to the South... stream_source_info Emily Fan Reja Liberty County Poster_final (1).pdf.txt stream_content_type text/plain stream_size 14405 Content-Encoding UTF-8 stream_name Emily Fan Reja Liberty County Poster_final (1).pdf.txt Content-Type text...

  14. Clark County- Energy Conservation Code

    Broader source: Energy.gov [DOE]

    In September 2010, Clark County adopted Ordinance 3897, implementing the Southern Nevada version of the 2009 International Energy Conservation Code for both residential and commercial buildings...

  15. Marin County- Solar Access Code

    Office of Energy Efficiency and Renewable Energy (EERE)

    Marin County's Energy Conservation Code is designed to assure new subdivisions provide for future passive or natural heating or cooling opportunities in the subdivision to the extent feasible. ...

  16. Adams County- Energy from Community Solar Gardens

    Broader source: Energy.gov [DOE]

    When SunShare’s solar garden comes online, Adams County will be the first county in the nation to power its buildings with community solar energy. The county projects energy cost savings of $300,...

  17. Bridging Brown County Case Study Bridging Brown County Case Study

    E-Print Network [OSTI]

    Minnesota, University of

    and Finding a Future Summary and Background Communities in the rural Midwest typically understand and solve unique issues facing rural communities? In Brown County, Minnesota, the community developed. But we also belong to a larger rural community: the community formed by all residents of Brown County. We

  18. Workplace Charging Challenge Partner: Suffolk County Community...

    Broader source: Energy.gov (indexed) [DOE]

    and Riverhead, Suffolk County Community College is the largest community college in New York State. Suffolk County Community College has a number of sustainability initiatives, as...

  19. Madison County- Wind Energy Systems Ordinance

    Broader source: Energy.gov [DOE]

    Madison County adopted a new land use ordinance in May 2010, which includes provisions for permitting wind turbines within the county.

  20. Santa Barbara County, California Data Dashboard | Department...

    Broader source: Energy.gov (indexed) [DOE]

    The data dashboard for Santa Barbara County, California, a partner in the Better Buildings Neighborhood Program. Santa Barbara County Data Dashboard More Documents & Publications...

  1. NISTIR 7427 ISBN 1-886843-60-0

    E-Print Network [OSTI]

    William T. Polk Kent Seamons #12;#12;NISTIR 7427 ISBN 1-886843-60-0 6th Annual PKI R&D Workshop "Applications-Driven PKI" Proceedings William T. Polk Computer Security Division Information Technology

  2. NIST Special Publication 800-63-2 Electronic Authentication

    E-Print Network [OSTI]

    . Dodson Elaine M. Newton Ray A. Perlner W. Timothy Polk Sarbari Gupta Emad A. Nabbus C O M P U T E R S E C. Timothy Polk Computer Security Division Information Technology Laboratory Sarbari Gupta Emad A. Nabbus

  3. NIST Special Publication 800-52 Guidelines for the Selection,

    E-Print Network [OSTI]

    of Transport Layer Security (TLS) Implementations Tim Polk Kerry McKay Santosh Chokhani http://dx.doi.org/10 Polk Kerry McKay Computer Security Division Information Technology Laboratory Santosh Chokhani Cygna

  4. NISTIR 7224 ISBN 1-886843-38-4

    E-Print Network [OSTI]

    Clifford Neuman Nelson E. Hastings William T. Polk #12;#12;NISTIR 7224 ISBN 1-886843-38-4 4th Annual PKI R. Hastings William T. Polk Computer Security Division Information Technology Laboratory National Institute

  5. Vegetation N A County

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricN A County road 39 Community D Bottomland Hardwood _

  6. Swift County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model forTechnologies95 Jump to:SwedenCounty,Swift County,

  7. Presque Isle County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975)Energy Technology Jump to:Presidio County, Texas: EnergyCounty,

  8. Preston County, West Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975)Energy Technology Jump to:Presidio County,MauiPreston County,

  9. Special Publication 800-147 BIOS Protection Guidelines

    E-Print Network [OSTI]

    of Standards and Technology DavidCooper WilliamPolk AndrewRegenscheid MurugiahSouppaya #12;NIST Special and Technology David Cooper William Polk Andrew Regenscheid Murugiah Souppaya C O M P U T E R S E C U R I T Y PROTECTION GUIDELINES Acknowledgments The authors, David Cooper, William Polk, Andrew Regenscheid

  10. County Council Comments Collin Lynch

    E-Print Network [OSTI]

    Eckhardt, Dave

    County Council Comments Collin Lynch June 6, 2006 My name is Collin Lynch. I reside at 2301 Tilbury Avenue in Squirrel Hill. I am a Ph.D. Candidate in Intelligent Systems at the University of Pittsburgh. I

  11. Climate Action Champions: Sonoma County Regional Climate Protection...

    Energy Savers [EERE]

    Sonoma County Regional Climate Protection Authority, CA Climate Action Champions: Sonoma County Regional Climate Protection Authority, CA In 2005, nine cities and the County of...

  12. An Archaeological Survey for the City of Montgomery 1097 Sewer Plant Relocation Project in Montgomery County Texas 

    E-Print Network [OSTI]

    Moore, William; Baxter, Edward

    2015-07-28

    An archaeological survey was conducted at an eight acre site in Montgomery County, Texas by Brazos Valley Research Associates (BVRA) on August 10, 2006 for LEFCO Environmental Technology, Inc. (LEFCO). The area was investigated through shovel...

  13. Onondaga County Department of Water Environment Protection: Process Optimization Saves Energy at Metropolitan Syracuse Wastewater Treatment Plant

    SciTech Connect (OSTI)

    2010-06-25

    This DOE Industrial Technologies Program spotlight describes how Onondaga County, New York, is saving nearly 3 million kWh and 270 million Btu annually at a wastewater treatment plant after replacing inefficient motors and upgrading pumps.

  14. Canning Coaches Josephine Caldwell (Bamberg County), Miriam Roman (Sumter County), Lil Stolzfus

    E-Print Network [OSTI]

    Stuart, Steven J.

    Canning Coaches ­ Josephine Caldwell (Bamberg County), Miriam Roman (Sumter County), Lil Stolzfus right provides very low cost, delicious, safe food for families. Canning done wrong wastes money

  15. Watauga County, North Carolina: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,VillageWarren Park,|InformationTechnologiesWatauga County,

  16. Presidio County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975)Energy Technology Jump to:Presidio County, Texas: Energy

  17. Prince William County, Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975)Energy Technology JumpWilliam County, Virginia: Energy

  18. CX-001538: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Polk County, Florida Energy Efficiency and Conservation Block Grant - Statement of Work Building Control Systems Energy Efficiency Retrofits (S)CX(s) Applied: A9, A11, B5.1Date: 03/31/2010Location(s): Polk County, FloridaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  19. Application of a New Structural Model & Exploration Technologies to Define a Blind Geothermal System: A Viable Alternative to Grid Drilling for Geothermal Exploration: McCoy, Churchill County, NV

    Broader source: Energy.gov [DOE]

    DOE Geothermal Technologies Peer Review 2010 - Presentation. Relevance of research: Improve exploration technologies for range-hosted geothermal systems:Employ new concept models and apply existing methods in new ways; Breaking geothermal exploration tasks into new steps, segmenting the problem differently; Testing new models for dilatent structures; Utilizing shallow thermal aquifer model to focus exploration; Refining electrical interpretation methods to map shallow conductive featuresIdentifying key faults as fluid conduits; and Employ soil gas surveys to detect volatile elements and gases common to geothermal systems.

  20. Fayette County Better Buildings Initiative

    SciTech Connect (OSTI)

    Capella, Arthur

    2015-03-04

    The Fayette County Better Buildings Initiative represented a comprehensive and collaborative approach to promoting and implementing energy efficiency improvements. The initiative was designed to focus on implementing energy efficiency improvements in residential units, while simultaneously supporting general marketing of the benefits of implementing energy efficiency measures. The ultimate goal of Fayette County’s Better Buildings Initiative was to implement a total of 1,067 residential energy efficiency retrofits with a minimum 15% estimated energy efficiency savings per unit. Program partners included: United States Department of Energy, Allegheny Power, and Private Industry Council of Westmoreland-Fayette, Fayette County Redevelopment Authority, and various local partners. The program was open to any Fayette County residents who own their home and meet the prequalifying conditions. The level of assistance offered depended upon household income and commitment to undergo a BPI – Certified Audit and implement energy efficiency measures, which aimed to result in at least a 15% reduction in energy usage. The initiative was designed to focus on implementing energy efficiency improvements in residential units, while simultaneously supporting general marketing of the benefits of implementing energy efficiency measures. Additionally, the program had components that involved recruitment and training for employment of persons in the energy sector (green jobs), as well as marketing and implementation of a commercial or community facilities component. The residential component of Fayette County’s Better Buildings Initiative involved a comprehensive approach, providing assistance to low- moderate- and market-rate homeowners. The initiative will also coordinate activities with local utility providers to further incentivize energy efficiency improvements among qualifying homeowners. The commercial component of Fayette County’s Better Building Initiative involved grants and loans to assist up to $15,000 projects per commercial structure with a mixture of a grant and financing at 0% for up to three – (3) years. The maximum award can be a $5,000 grant and a $10,000 loan. For projects less than $15,000, the award will have a ratio of 1/3 grant and 2/3 loan.

  1. Solar Applications to Multiple County Buildings Feasibility Study

    Broader source: Energy.gov [DOE]

    This study was requested by Salt Lake County in an effort to obtain a cursory overview of solar electric and solar thermal application possibilities on the rooftops of existing county buildings. The subject buildings represent various County Divisions: Aging Services, Community Services, County Health, County Library, Parks & Recreation, Public Works, County Sheriff and Youth Services. There are fifty two buildings included in the study.

  2. San Bernardino County- Green Building Requirement

    Broader source: Energy.gov [DOE]

    In August 2007, the San Bernardino County Board of Supervisors approved a policy requiring that all new county buildings and major renovations be built to LEED Silver standards. The decision was...

  3. Carroll County- Green Building Property Tax Credit

    Broader source: Energy.gov [DOE]

    The state of Maryland permits Carroll County (Md Code: Property Tax § 9-308(e)) to offer property tax credits for high performance buildings if it chooses to do so.* Carroll County has exercised...

  4. Miami-Dade County- Sustainable Buildings Program

    Broader source: Energy.gov [DOE]

    In 2005, the Miami-Dade Board of County Commissioners passed a resolution to incorporate sustainable building measures into county facilities. In 2007, Ordinance 07-65 created the Sustainable...

  5. UF IFAS EXTENSION ALACHUA COUNTY PROVIDING SOLUTIONS

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    Services, Alachua County Board of County Commissioners and strives to impact the well-being of the citizens. Injecting soil-marking dyes into irrigation systems and digging the soil to show the water movement within

  6. Pitt County- Wind Energy Systems Ordinance

    Broader source: Energy.gov [DOE]

    The Pitt County Board of Commissioners adopted amendments to the county zoning ordinance in March 2010 which classify wind energy systems as an accessory use and establish siting and permitting...

  7. Forest County Potawatomi Community- 2014 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    Forest County Potawatomi Community (FCPC), in collaboration with a selected contractor, will install and operate approximately 875 kilowatts (kW) of solar photovoltaic (PV) systems at a minimum of eight tribal facilities in Milwaukee and Forest Counties.

  8. Jefferson County State of the Community Report 

    E-Print Network [OSTI]

    Chen, Xi; Lee, Kanghyun; Aldalbahi, Faisal

    2015-01-01

    of metropolitan Denver. The county itself covers 774 square miles of total land. With a current overall population of approximately 551,798, it is the fourth populous county in Colorado. Lakewood is the largest city in the county. Motherland of the famous... of Incorporation 1861 Square Miles 773 Square Miles Unincorporated Je?erson County Area 653 Miles Percentage days of Sunshine 70% sunshine Hottest Month July (74 degree average) Coldest Month January (30 degrees average) Annual Precipitation 15.4 inches...

  9. Burleson County State of the Community Report 

    E-Print Network [OSTI]

    Cousins, Tiffany; English, Jeffrey; Meng, Yi

    2015-01-01

    1846. Burleson County joined the Brazos Valley Council of Governments in 1966. In recent history, current County Judge Mike Sutherland has been in office since 2003. METHODS • Input / Output Analysis; Showing the importing and exporting of employed... Centers along side Citizen Collection Stations to reduce carbon footprint. • San Antonio Water Pipeline deal could create some local jobs through construction. CENSUS/ACS DATA CHARTS REFERENCES • Burleson County: Office of County Judge, Mike...

  10. Benton County | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformation BeaufortBent County, Colorado: Energy ResourcesCounty Jump to:

  11. Archuleta County CO Lineaments

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-01-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Geothermal Development Associates, Reno, Nevada Publication Date: 2012 Title: Archuleta Lineaments Edition: First Publication Information: Publication Place: Reno Nevada Publisher: Geothermal Development Associates, Reno, Nevada Description: This layer traces apparent topographic and air-photo lineaments in the area around Pagosa springs in Archuleta County, Colorado. It was made in order to identify possible fault and fracture systems that might be conduits for geothermal fluids. Geothermal fluids commonly utilize fault and fractures in competent rocks as conduits for fluid flow. Geothermal exploration involves finding areas of high near-surface temperature gradients, along with a suitable “plumbing system” that can provide the necessary permeability. Geothermal power plants can sometimes be built where temperature and flow rates are high. To do this, georeferenced topographic maps and aerial photographs were utilized in an existing GIS, using ESRI ArcMap 10.0 software. The USA_Topo_Maps and World_Imagery map layers were chosen from the GIS Server at server.arcgisonline.com, using a UTM Zone 13 NAD27 projection. This line shapefile was then constructed over that which appeared to be through-going structural lineaments in both the aerial photographs and topographic layers, taking care to avoid manmade features such as roads, fence lines, and right-of-ways. These lineaments may be displaced somewhat from their actual location, due to such factors as shadow effects with low sun angles in the aerial photographs. Note: This shape file was constructed as an aid to geothermal exploration in preparation for a site visit for field checking. We make no claims as to the existence of the lineaments, their location, orientation, and nature. Spatial Domain: Extent: Top: 4132831.990103 m Left: 311979.997741 m Right: 331678.289280 m Bottom: 4116067.165795 m Contact Information: Contact Organization: Geothermal Development Associates, Reno, Nevada Contact Person: Richard “Rick” Zehner Address: 3740 Barron Way City: Reno State: NV Postal Code: 89511 Country: USA Contact Telephone: 775-737-7806 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

  12. Asbestos Emission Control Plan Dakota County, Minnesota

    E-Print Network [OSTI]

    Netoff, Theoden

    Asbestos Emission Control Plan UMore Park Dakota County, Minnesota Prepared for University of Minnesota Revised: July 22, 2009 UMP005460 #12;Asbestos Emission Control Plan UMore Park Dakota County.0.doc iii Asbestos Emission Control Plan UMore Park Dakota County, Minnesota Revised: July 22, 2009

  13. Liberty County State of the Community Report 

    E-Print Network [OSTI]

    Perkes, Scott; Deng, Sitong; Rojas, Ricardo J. Maga

    2015-01-01

    Republic of Texas. ? Liberty was incorporated as a city and the county seat in 1837. ? 1,176 Square Miles ? Borders Harris County (contains City of Houston) ? Rural county with approximately 88% of its land used for agricultural purposes. State of Texas...

  14. Public Health County of Santa Cruz

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Public Health Division County of Santa Cruz HEALTH SERVICES AGENCY POST OFFICE BOX 962, 1080 Date: December 3, 2009 Phone: 831-454-4000 Email: hsadocpio@co.santa-cruz.ca.us County Health Department Announces Flu Vaccine Clinic Santa Cruz County Public Health will hold an additional walk

  15. EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona

    Broader source: Energy.gov [DOE]

    This EIS, prepared by the Bureau of Land Management with DOE’s Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western’s transmission lines.

  16. Retrofit Savings for Brazos County 

    E-Print Network [OSTI]

    Baltazar-Cervantes, J. C.; Shao, X.; Claridge, D. E.

    2001-01-01

    This report presents the energy and dollar savings for the period May 2000 - April 2001 for 10 of the Brazos County facilities that have been retrofit. The electricity use saved was 555,170 kWh and the demand was 1062 kW, which is equivalent to a...

  17. Kemper County IGCC (tm) Project Preliminary Public Design Report

    SciTech Connect (OSTI)

    Nelson, Matt; Rush, Randall; Madden, Diane; Pinkston, Tim; Lunsford, Landon

    2012-07-01

    The Kemper County IGCC Project is an advanced coal technology project that is being developed by Mississippi Power Company (MPC). The project is a lignite-fueled 2-on-1 Integrated Gasification Combined-Cycle (IGCC) facility incorporating the air-blown Transport Integrated Gasification (TRIG™) technology jointly developed by Southern Company; Kellogg, Brown, and Root (KBR); and the United States Department of Energy (DOE) at the Power Systems Development Facility (PSDF) in Wilsonville, Alabama. The estimated nameplate capacity of the plant will be 830 MW with a peak net output capability of 582 MW. As a result of advanced emissions control equipment, the facility will produce marketable byproducts of ammonia, sulfuric acid, and carbon dioxide. 65 percent of the carbon dioxide (CO{sub 2}) will be captured and used for enhanced oil recovery (EOR), making the Kemper County facility’s carbon emissions comparable to those of a natural-gas-fired combined cycle power plant. The commercial operation date (COD) of the Kemper County IGCC plant will be May 2014. This report describes the basic design and function of the plant as determined at the end of the Front End Engineering Design (FEED) phase of the project.

  18. Energy development in the US Rockies: A Role for counties?

    SciTech Connect (OSTI)

    Davis, C.; Hoffer, K. [Colorado State University, Fort Collins, CO (United States)

    2010-04-01

    This article analyzes the role played by county commissioners in Colorado and Montana in restricting or facilitating the use of clean energy sources in the generation of electrical power. Using data obtained from responses to an internet survey, we found that many commissioners in both states developed land use policies dealing with renewable energy resources over the preceding five years. Colorado and Montana officials were quite similar in terms of their positive reaction to changes that would facilitate greater county interest in clean energy policies. Most respondents favored increasing the pace of renewable energy use in relation to traditional energy sources but were also supportive of a more inclusive renewable portfolio standard that would embrace clean coal technologies and nuclear power.

  19. EA-1957: Cabin Creek Biomass Facility, Placer County, California

    Broader source: Energy.gov [DOE]

    DOE is proposing to provide funding to Placer County, California to construct and operate a two-megawatt wood-to-energy biomass facility at the Eastern Regional Materials Recovery Facility (MRF) and Landfill in unincorporated Placer County. The wood?to?energy biomass facility would use a gasification technology. The fuel supply for the proposed project would be solely woody biomass, derived from a variety of sources including hazardous fuels residuals, forest thinning and harvest residuals, and Wildland Urban Interface sourced waste materials from residential and commercial property defensible space clearing and property management activities. NOTE: After review of a final California Environmental Quality Act Environmental Impact Report, DOE has determined that preparation of an EA is not necessary. The propsed action fits within DOE's categorical exclusion B5.20. Therefore, this EA is cancelled.

  20. Ponding Test Results Seepage and Total Losses, North Alamo Main Canal Hidalgo County Irrigation District No. 2 

    E-Print Network [OSTI]

    Leigh, E.; Fipps, G.

    2008-01-01

    .txt Content-Type text/plain; charset=ISO-8859-1 TR-324 2008 Ponding Test Results Seepage and Total Losses, North Alamo Main Canal Hidalgo County Irrigation District No. 2 Eric Leigh Texas AgriLife Extension... PONDING TEST RESULTS SEEPAGE AND TOTAL LOSSES NORTH ALAMO MAIN CANAL HIDALGO COUNTY IRRIGATION DISTRICT NO. 2 Report Prepared by: Eric Leigh and Guy Fipps,1 P.E. February 4, 2004 IRRIGATION TECHNOLOGY CENTER...

  1. An Archaeological Survey for the Montgomery Community Center Project in Montgomery County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-28

    An archaeological survey was conducted at a 4.3-acre site in Montgomery County, Texas by Brazos Valley Research Associates (BVRA) on July 3, 2007 for LEFCO Environmental Technology, Inc. The area was investigated through shovel testing and a 100...

  2. EXPERIMENTAL NON-DESTRUCTIVE TESTING OF FRP MATERIALS, INSTALLATION, AND PERFORMANCE, DALLAS COUNTY BRIDGE, MISSOURI, USA

    E-Print Network [OSTI]

    Maerz, Norbert H.

    EXPERIMENTAL NON-DESTRUCTIVE TESTING OF FRP MATERIALS, INSTALLATION, AND PERFORMANCE, DALLAS COUNTY provided the opportunity to use new and existing technologies to test the FRP materials installations alignment, FRP delamination, and FRP bond pull-off strength. Results of testing to date are presented

  3. Clallam County PUD- Residential Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Clallam County PUD offers a variety of rebates for residential customers for energy efficiency improvements. Eligible measures and incentives include window upgrades, insulation, air and duct...

  4. Building Green in Greensburg: Kiowa County Courthouse

    Office of Energy Efficiency and Renewable Energy (EERE)

    This poster highlights energy efficiency, renewable energy, and sustainable features of the renovated high-performing Kiowa County Courthouse building in Greensburg, Kansas.

  5. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  6. Explosion at Easington Colliery County Durham 

    E-Print Network [OSTI]

    Roberts, H. C. W.

    Report On the causes of, and circumstances attending, the explosion which occurred at Easington Colliery, County Durham, on the 29th May, 1951.

  7. Carteret County- Wind Energy System Ordinance

    Broader source: Energy.gov [DOE]

    Carteret County passed an ordinance to specify the permitting process and establish siting requirements for wind energy systems. There are different rules and a different permitting process...

  8. Arlington County, Virginia: Community Energy Plan

    Broader source: Energy.gov [DOE]

    This presentation features Richard Dooley, community energy coordinator with Arlington County's Office of Sustainability and Environmental Management. Dooley provides an overview of the development...

  9. Maricopa County- Renewable Energy Systems Zoning Ordinance

    Broader source: Energy.gov [DOE]

    The Maricopa County Zoning Ordinance contains provisions for siting renewable energy systems. The ordinance defines renewable energy as "energy derived primarily from sources other than fossil...

  10. Forest County Potawatomi Community- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Forest County Potawatomi Community (FCPC) will conduct an energy efficiency feasibility study at Potawatomi Carter Casino Hotel (PCCH) in Northern Wisconsin.

  11. EIS-0461: Hyde County Wind Energy Center Project, Hyde and Buffalo Counties, South Dakota

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the environmental impacts of interconnecting the proposed 150 megawatt Hyde County Wind Energy Center Project, in Hyde County, South Dakota, with DOE’s Western Area Power Administration’s existing Fort Thompson Substation in Buffalo County, South Dakota.

  12. Sweetwater County, Wyoming: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model forTechnologies95 Jump to:SwedenCounty, Wyoming:

  13. Swisher County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren)Model forTechnologies95 Jump to:SwedenCounty,Swift

  14. Prentiss County, Mississippi: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975)Energy Technology Jump to: navigation,NewPrenova IncCounty,

  15. Coleman County Elec Coop, Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal TechnologiesClio Power LtdCounty Elec Coop, Inc Jump to:

  16. Collin County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar EnergyLawler,Coal TechnologiesClio Power LtdCounty Elec Coop, Inc JumpCollin

  17. Providence County, Rhode Island: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report Url JumpTechnology Jump to:CapabilitiesProvidence County,

  18. Queens County, New York: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report Url JumpTechnology JumpPrueba 1VenturePzeroLLCQueens County,

  19. Blaine County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-Gas Technologies,Blackhawk Biofuels LLCBlaine County, Idaho:

  20. Blaine County, Montana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-Gas Technologies,Blackhawk Biofuels LLCBlaine County,

  1. Bledsoe County, Tennessee: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-Gas Technologies,BlackhawkBlauvelt, New York:Bledsoe County,

  2. Spotlight on Rutland County, Vermont: How Local Ties Lead to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rutland County, Vermont: How Local Ties Lead to Local Wins Spotlight on Rutland County, Vermont: How Local Ties Lead to Local Wins Spotlight on Rutland County, Vermont: How Local...

  3. Building Green in Greensburg: Kiowa County Memorial Hospital...

    Energy Savers [EERE]

    Kiowa County Memorial Hospital Building Green in Greensburg: Kiowa County Memorial Hospital This poster highlights energy efficiency, renewable energy, and sustainable features of...

  4. Better Buildings: Workforce: Spotlight on Fayette County, Pennsylvania...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workforce: Spotlight on Fayette County, Pennsylvania: Developing the Skills and Tools for Workforce Success Better Buildings: Workforce: Spotlight on Fayette County, Pennsylvania:...

  5. Forest County Potawatomi Recognized for Renewable Energy Achievements...

    Energy Savers [EERE]

    Forest County Potawatomi Recognized for Renewable Energy Achievements Forest County Potawatomi Recognized for Renewable Energy Achievements May 28, 2014 - 5:53pm Addthis A...

  6. The University Maryland Baltimore County Office of Sponsored Programs

    E-Print Network [OSTI]

    Maryland, Baltimore County, University of

    The University Maryland Baltimore County Office of Sponsored Programs Subaward Policies and Procedures Purpose The purpose of the University Maryland Baltimore County Subaward Policies and Procedures

  7. Department of Information Systems 1 University of Maryland, Baltimore County

    E-Print Network [OSTI]

    Lutters, Wayne G.

    Department of Information Systems 1 University of Maryland, Baltimore County Baltimore, MD 21250, Baltimore County Baltimore, MD 21250 Grading Policies GRADING STANDARDS The University's Undergraduate

  8. EIS-0489: Jordan Cove Liquefaction Project (Coos County, OR)...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) EIS-0489: Jordan Cove Liquefaction...

  9. Elko County School District District Heating Low Temperature...

    Open Energy Info (EERE)

    Elko County School District District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Elko County School District District Heating Low Temperature...

  10. EECBG Success Story: A Michigan County Unearths Savings with...

    Office of Environmental Management (EM)

    County Courthouse Goes Solar EECBG Success Story: Florida County Helping Homeowners Save Energy and Money Seniors check out the new energy-efficient fitness facility at the...

  11. FAYETTE COUNTY TRAINS TOMORROW'S WORKFORCE | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    WHAT'S NEXT? Fayette County's low-income households (less than 200% of the federal poverty level) continue to receive energy efficiency improvements through the county's...

  12. Los Alamos County Completes Abiquiu Hydropower Project, Bringing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County Completes Abiquiu Hydropower Project, Bringing New Clean Energy Resources to New Mexico Los Alamos County Completes Abiquiu Hydropower Project, Bringing New Clean Energy...

  13. Puge County Gongdefang Hydropower Station Investment and Development...

    Open Energy Info (EERE)

    Puge County Gongdefang Hydropower Station Investment and Development Co Ltd Jump to: navigation, search Name: Puge County Gongdefang Hydropower Station Investment and Development...

  14. Los Angeles County's Green Idea House Achieves Efficient Goals...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    County's Green Idea House Achieves Efficient Goals Los Angeles County's Green Idea House Achieves Efficient Goals Photo of an energy-efficient home with modern architecture. The...

  15. Forest County Potawatomi Tribe Cuts Emissions, Promotes Green...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Emissions, Promotes Green Growth Forest County Potawatomi Tribe Cuts Emissions, Promotes Green Growth February 23, 2012 - 6:29pm Addthis The Forest County Potawatomi Tribe's solar...

  16. EECBG Success Story: Solar Projects Provide Energy to County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Projects Provide Energy to County Fairgrounds September 23, 2010 - 1:01pm Addthis Solar panels have been installed at a shelter facility near Ulster County Fairgrounds. |...

  17. Rutland County Summary of Reported Data | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    of data reported by Better Buildings Neighborhood Program partner Rutland County, Vermont. Rutland County Summary of Reported Data More Documents & Publications Virginia --...

  18. Santa Barbara County, California Summary of Reported Data | Department...

    Broader source: Energy.gov (indexed) [DOE]

    data reported by Better Buildings Neighborhood Program partner Santa Barbara County, California. Santa Barbara County, California Summary of Reported Data More Documents &...

  19. A Design-Builder's Perspective: Anaerobic Digestion, Forest County...

    Energy Savers [EERE]

    A Design-Builder's Perspective: Anaerobic Digestion, Forest County Potawatomi Community - A Case Study A Design-Builder's Perspective: Anaerobic Digestion, Forest County Potawatomi...

  20. EIS-0489: Jordan Cove Liquefaction Project (Coos County, OR)...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    89: Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) EIS-0489: Jordan Cove Liquefaction...

  1. Public Health County of Santa Cruz

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Public Health Division County of Santa Cruz HEALTH SERVICES AGENCY POST OFFICE BOX 962, 1080 at the two Public Health clinics located at 1080 Emeline Ave. in Santa Cruz and at 9 Crestview Dr. in Watsonville, on a walk-in basis. County health clinic services are limited to those who reside in Santa Cruz

  2. Technology Assessment TECHNOLOGY ASSESSMENT

    E-Print Network [OSTI]

    Rock, Chris

    Technology Assessment 10/14/2004 1 TECHNOLOGY ASSESSMENT STRATEGIC PLAN MISSION STATEMENT Support the Mission of Texas Tech University and the TTU Information Technology Division by providing timely and relevant information and assistance in current and emerging technologies and their practical applications

  3. Bioscience Technology Bioscience Technology

    E-Print Network [OSTI]

    Vertes, Akos

    Bioscience Technology Bioscience Technology Advantage Business Media 100 Enterprise Drive Rockaway, co-director of George Washington University's Institute for Proteomics Technology and Applications-by-point. Manufacturers have stampeded to offer the new technology. Applied Biosystems got out in front in 2004 when

  4. Environmental assessment: Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of nine potentially acceptable sites for a mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and the eight other potentially sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines. On the basis of these findings, the DOE is nominating the Deaf Smith County site as one of the five sites suitable for characterization. 591 refs., 147 figs., 173 tabs.

  5. Clean Fuel Advanced Technology 2014 Grant Awardees Applicant Project Type County(s)

    E-Print Network [OSTI]

    , Edgecombe $59,862 $14,966 $74,828 EPES Transport Five Freightliner CNG class 8 tractors. Mecklenburg for use by the Police Department. Guilford $21,395 $5,349 $26,744 MacLeod Construction Nine CNG concrete,974 $23,244 $116,218 Penske Truck Leasing Three CNG heavy-duty trucks for its rental and leasing

  6. Daemen Alternative Energy/Geothermal Technologies Demonstration Program Erie County

    Broader source: Energy.gov [DOE]

    Project objectives: Replacement of the inefficient Marian Library Heating System with a state of the art, open loop, geo-exchange system in conjunction withthe Daemen College sustainable campus objectives. Coursework to be developed to engage students in the evaluation and future modifications of our campus buildings.

  7. El Paso County Geothermal Project: Innovative Research Technologies Applied

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatementofApril 25,EVthe nextofofEffluent

  8. Texas County Fairs: A Report of Survey Results. 

    E-Print Network [OSTI]

    Watt, Carson E.; Wicks, Bruce E.

    1983-01-01

    , Texas 78220 Bexar County Festival San Jacinto c/o Rey Andricks 215 West Lynwood Boulevard San Antonio, Texas 78212 Blanco County Blanco County Fair and Rodeo c/o Ms . Carol Ha l ey P . O. Box 261 Johnson City, Texas 78636 Bowie County Four...

  9. Charging Up in King County, Washington

    Broader source: Energy.gov [DOE]

    King County, Washington is spearheading a regional effort to develop a network of electric vehicle charging stations. It is also improving its vehicle fleet and made significant improvements to a...

  10. The vascular flora of Robertson County, Texas 

    E-Print Network [OSTI]

    Starbuck, Thomas Junn

    1984-01-01

    of Department) May ' 984 ABSTRACT The vascular Flora of Robertson county, Texas (May 1984) Thomas J. Starbuck, B. S. , Howard Payne University Chairman of Advisory Committee: Dr. Hugh D. Wilson Vascular plant collections and field dara compiled during a...

  11. Gaines County Solid Waste Management Act (Texas)

    Broader source: Energy.gov [DOE]

    This Act establishes the Gaines County Solid Waste Management District, a governmental body to develop and carry out a regional water quality protection program through solid waste management and...

  12. Burleson County State of the Community Report 

    E-Print Network [OSTI]

    Doremus, Lindsay; De Oliveira, Thiago Coelho; Simcic, Lauren

    2015-01-01

    hazards • Drought/ loss of water in reservoir • Disturbance of ecosystems by pipeline WEAKNESSES OPPORTUNITIES THREATS Burleson County is located in East-Central Texas. It encompasses a to- tal area of 677 square miles and contains two major cities...

  13. Forest County Potawatomi Community- 2010 Project

    Broader source: Energy.gov [DOE]

    The Forest County Potawatomi Community ("FCPC" or "Tribe") owns a six-story parking facility that consists of two separate buildings located on fee land adjacent to its Milwaukee Bingo Casino operation.

  14. Environmental assessment: Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    In February 1983, the US Department of Energy (DOE) identified a location in Deaf Smith County, Texas, as one of the nine potentially acceptable sites for mined geologic repository for spent nuclear fuel and high-level radioactive waste. To determine their suitability, the Deaf Smith County site and eight other potentially acceptable sites have been evaluated in accordance with the DOE's General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories. The Deaf Smith County site is in the Permian Basin, which is one of five distinct geohydrologic settings considered for the first repository. On the basis of the evaluations reported in this EA, the DOE has found that the Deaf Smith County site is not disqualified under the guidelines.

  15. Orange County- Small Wind Energy Systems

    Broader source: Energy.gov [DOE]

    In December 2010, the County of Orange Board of Supervisors adopted small wind performance and development standards (Ord. No. 10-020) in order to promote distributed generation systems in non...

  16. Charging Up in King County, Washington

    ScienceCinema (OSTI)

    Constantine, Dow; Oliver, LeAnn; Inslee, Jay; Sahandy, Sheida; Posthuma, Ron; Morrison, David;

    2013-05-29

    King County, Washington is spearheading a regional effort to develop a network of electric vehicle charging stations. It is also improving its vehicle fleet and made significant improvements to a low-income senior housing development.

  17. Environmental assessment, Deaf Smith County site, Texas

    SciTech Connect (OSTI)

    Not Available

    1986-05-01

    The Nuclear Waste Policy Act of 1982 (42 USC sections 10101-10226) requires the environmental assessment of a proposed site to include a statement of the basis for nominating a site as suitable for characterization. Volume 2 provides a detailed statement evaluating the site suitability of the Deaf Smith County Site under DOE siting guidelines, as well as a comparison of the Deaf Smith County Site to the other sites under consideration. The evaluation of the Deaf Smith County Site is based on the impacts associated with the reference repository design, but the evaluation will not change if based on the Mission Plan repository concept. The second part of this document compares the Deaf Smith County Site to Davis Canyon, Hanford, Richton Dome and Yucca Mountain. This comparison is required under DOE guidelines and is not intended to directly support subsequent recommendation of three sites for characterization as candidate sites. 259 refs., 29 figs., 66 refs. (MHB)

  18. Cowlitz County PUD- Residential Weatherization Plus Program

    Broader source: Energy.gov [DOE]

    Cowlitz County PUD offers an incentive to residential customers who weatherize their homes. Eligible residences can be either site-built or manufactured homes, but must have a permanently installed...

  19. Western Baldwin County, AL Grid Interconnection Project

    SciTech Connect (OSTI)

    Thomas DeBell

    2011-09-30

    The Objective of this Project was to provide an additional supply of electricity to the affected portions of Baldwin County, AL through the purchase, installation, and operation of certain substation equipment.

  20. Liberty County State of the Community Report 

    E-Print Network [OSTI]

    Shakra, Vera Abou; Page, Hilary; Yan, Wenqian

    2015-01-01

    map (Courtesy of TAMU, 2015) 26 Liberty County State of Community Railroads Both Burlington Northern & Santa Fe Railroad (BNSF) and Union Pacific Railroad (UP) operate and have track rights on rail throughout Liberty County (see Figure 31... the development of a 32-mile rail bypass route from the CMC rail yard west of Dayton northward to connect to the BNSF and/or UP to the east...

  1. SOLAR PANELS ON HUDSON COUNTY FACILITIES

    SciTech Connect (OSTI)

    BARRY, KEVIN

    2014-06-06

    This project involved the installation of an 83 kW grid-connected photovoltaic system tied into the energy management system of Hudson County's new 60,000 square foot Emergency Operations and Command Center and staff offices. Other renewable energy features of the building include a 15 kW wind turbine, geothermal heating and cooling, natural daylighting, natural ventilation, gray water plumbing system and a green roof. The County intends to seek Silver LEED certification for the facility.

  2. The vascular flora of Madison County, Texas 

    E-Print Network [OSTI]

    Neill, Amanda Kathryn

    2000-01-01

    , and Sphagnum bog development in Robertson and Leon counties (Bryant 1977). While seeps and springs do occur along the Navasota River m Madison County, true bogs have not been found. Both Rowell (1949) and Starbuck (1984) descnbed Sphagnum bog communities... of collection, data were recorded on the specific habitat and relative abundance of the species in the area Similar floristic research was revieived lor exposure to floiistic protocol References mclude Allen (1974), McCaleb ()954), Reed (1997), Starbuck (1984...

  3. Demonstration of physical separation/leaching methods for the remediation of heavy metals contaminated soils at small arms ranges (acid leaching demo). Technology Demonstration, November 1995-September 1997

    SciTech Connect (OSTI)

    1997-02-07

    The U.S. Army Environmental C%`enter in partnership with the Naval Facilities Engineering Services Center and the U.S. Army Engineer Waterways Experiment Station demonstrated Physical Separation/Leaching methods for the remediation of small arms range soils. The demonstration occurred at Fort Polk, Louisiana. After conducting a world-wide search, two vendors were selected to demonstrate two variations of the physical separation/leaching technologies. The first using a process based on acetic (weak) acid chemistry and the second based on hydrochloric (strong) acid chemistry. Following completion of the bench treatability studies, each vendor performed a full scale (5-10 tons per hour, 1000 tons total) demonstration of their respective technologies. This report documents the worldwide search that was performed to identify vendors of soil remediation equipment and/or contractors who have successfully completed similar remediation projects. A number of information sources, including experts at government and RD institutions, libraries, professional journals, on-line services, academia and industry contacts were used to complete this report. Should the reader be interested in other environmental problems or other technologies not considered for this report, a listing of Internet sites searched during the effort is included and provides ample coverage of the remediation technologies available. The mention of trade names or commercial products in this report should not be constituted as endorsement or recommendation for use.

  4. Ramsey County commercial, industrial, institutional waste reduction and recycling program

    SciTech Connect (OSTI)

    Lyman-Onkka, C.

    1995-09-01

    The Ramsey County Commercial, Industrial, Institutional Waste Reduction and Recycling Program was developed (1) to raise awareness of waste reduction and recycling opportunities for businesses, (2) to make information available to businesses, (3) to provide technical assistance to small and medium sized businesses on waste reduction and recycling, and (4) to raise awareness of Ramsey County as a technical resource. Ramsey County was founded in 1849 and is named for Alexander Ramsey, the first governor of the Minnesota Territory. Ramsey County is the smallest, most urban of all 87 counties in Minnesota. With 170 square miles and a 1990 population of 485,000, Ramsey has the most people per square mile of any county in Minnesota. There are 19 cities within the County, the largest is Saint Paul with a 1990 population of 272,000. There are no unincorporated areas in Ramsey County. This report describes the efforts directed towards raising the awareness of the county waste management, recycling program.

  5. EIS-0221: Proposed York County Energy Partners Cogeneration Facility, York County, PA

    Broader source: Energy.gov [DOE]

    The Department of Energy prepared this environmental impact statement to assess the environmental and human health impacts associated with construction and operation of the York County Energy Partners, L.P. Cogeneration Facility on a 38- acre parcel in North Codorus Township, York County, Pennsylvania.

  6. Impact of New Irrigation Technology on the Texas High Plains: 1980-2020 

    E-Print Network [OSTI]

    Reneau, D. R.; Lacewell, R. D.; Ellis, J. R.

    1983-01-01

    based upon representative counties showed the similarities and differences of response given particular resource endowments, technological options and price situations. Part of the analysis considers the impact of annual qroundwater withdrawal...

  7. CX-000012: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Eagle Junction Clearwire Wireless Communication FacilitiesCX(s) Applied: B1.7, B1.15, B1.19Date: 12/02/2009Location(s): Polk County, OregonOffice(s): Bonneville Power Administration

  8. Faience Technology

    E-Print Network [OSTI]

    Nicholson, Paul

    2009-01-01

    by Joanne Hodges. Faience Technology, Nicholson, UEE 2009Egyptian materials and technology, ed. Paul T. Nicholson,Nicholson, 2009, Faience Technology. UEE. Full Citation:

  9. Eagle County - Energy Smart Colorado Renewable Energy Rebate...

    Open Energy Info (EERE)

    Center. The Energy Smart program in Eagle County is funded in part by Eagle County Eco-Build funds which are fees for energy building code mitigation collected in unincorporated...

  10. Fewer lights, Brighter Shine in New Hampshire County

    Broader source: Energy.gov [DOE]

    The parking lot to the county courthouse and nursing home facility in Strafford County, New Hampshire needed new lights. And thanks to an Energy Efficiency and Conservation Block Grant from the Energy Department, Strafford got what it needed and more.

  11. EA-118 Hill County Electric Cooperative, Inc. | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energy to Canada. EA-118 Hill County.pdf More Documents & Publications PP-118 Hill County Electric Cooperative Inc EA-209 Cargill-Alliant, LLC EA-211 DTE Energy Trading, Inc...

  12. Anne Arundel County- Solar and Geothermal Equipment Property Tax Credits

    Broader source: Energy.gov [DOE]

    Anne Arundel County offers a one-time credit from county property taxes on residential dwellings that use solar and geothermal energy equipment for heating and cooling, and solar energy equipment...

  13. Harris County- Property Tax Abatement for Green Commercial Buildings

    Broader source: Energy.gov [DOE]

    This type of tax abatement may be sought by an applicant of the County’s standard economic development tax abatement, or as a stand-alone tax abatement. When an applicant seeks only a LEED Certif...

  14. PUD No 1 of Asotin County | Open Energy Information

    Open Energy Info (EERE)

    PUD No 1 of Asotin County Jump to: navigation, search Name: PUD No 1 of Asotin County Place: Washington Phone Number: 509-758-1010 Website: www.asotinpud.orgelectrical.h Outage...

  15. EECBG Success Story: Florida County Helping Homeowners Save Energy...

    Office of Environmental Management (EM)

    Florida County Helping Homeowners Save Energy and Money EECBG Success Story: Florida County Helping Homeowners Save Energy and Money March 9, 2011 - 1:23pm Addthis Taking note of...

  16. Funding for state, city, and county governments in the state...

    Office of Environmental Management (EM)

    Funding for state, city, and county governments in the state includes: NM New Mexico Total Sum City, County, and SEO Allocations All 20,608,300 NM New Mexico State Energy Office...

  17. Desegregation in Brazos County, Texas, 1946-1971 

    E-Print Network [OSTI]

    Hill, Scott Ogden

    1998-01-01

    that favored integrations their influence did not speed the process. Integration in the county was effected by the burning of several schools. Ultimately, the last district in the county fully integrated in 1971, seventeen years after the Brown decision....

  18. EIS-0455: Genesis Solar Energy Project in Riverside County, CA...

    Office of Environmental Management (EM)

    5: Genesis Solar Energy Project in Riverside County, CA EIS-0455: Genesis Solar Energy Project in Riverside County, CA December 17, 2010 EIS-0455: Notice of Adoption of an...

  19. EIS-0439: Rice Solar Energy Project in Riverside County, CA ...

    Office of Environmental Management (EM)

    9: Rice Solar Energy Project in Riverside County, CA EIS-0439: Rice Solar Energy Project in Riverside County, CA March 29, 2010 EIS-0439: Notice of Intent to Prepare an...

  20. Small Power Plant Exemption (06-SPPE-1) Imperial County

    E-Print Network [OSTI]

    Small Power Plant Exemption (06-SPPE-1) Imperial County NILAND GAS TURBINE PLANT PRESIDINGMEMBER (06-SPPE-1) Imperial County NILAND GAS TURBINE PLANT PRESIDINGMEMBER Exemption (SPPE). The Energy Commission Committee assigned to the Niland Gas Turbine Plant Project

  1. Energy Efficient Buildings, Salt Lake County, Utah

    SciTech Connect (OSTI)

    Barnett, Kimberly

    2012-04-30

    Executive Summary Salt Lake County's Solar Photovoltaic Project - an unprecedented public/private partnership Salt Lake County is pleased to announce the completion of its unprecedented solar photovoltaic (PV) installation on the Calvin R. Rampton Salt Palace Convention Center. This 1.65 MW installation will be one the largest solar roof top installations in the country and will more than double the current installed solar capacity in the state of Utah. Construction is complete and the system will be operational in May 2012. The County has accomplished this project using a Power Purchase Agreement (PPA) financing model. In a PPA model a third-party solar developer will finance, develop, own, operate, and maintain the solar array. Salt Lake County will lease its roof, and purchase the power from this third-party under a long-term Power Purchase Agreement contract. In fact, this will be one of the first projects in the state of Utah to take advantage of the recent (March 2010) legislation which makes PPA models possible for projects of this type. In addition to utilizing a PPA, this solar project will employ public and private capital, Energy Efficiency and Conservation Block Grants (EECBG), and public/private subsidized bonds that are able to work together efficiently because of the recent stimulus bill. The project also makes use of recent changes to federal tax rules, and the recent re-awakening of private capital markets that make a significant public-private partnership possible. This is an extremely innovative project, and will mark the first time that all of these incentives (EECBG grants, Qualified Energy Conservation Bonds, New Markets tax credits, investment tax credits, public and private funds) have been packaged into one project. All of Salt Lake County's research documents and studies, agreements, and technical information is available to the public. In addition, the County has already shared a variety of information with the public through webinars, site tours, presentations, and written correspondence.

  2. An Archaeological Survey for the Parker County Special Utility District Water System Improvements in Parker County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-31

    . Gustavus, Adolphus Holland, 1931 History of Parker County and the Double Log Cabin. The Herald, Weatherford, Texas (reprinted in 1937). Jordan, Edith Marian 1935 The History of Parker County. M.A. thesis, The University of Texas at Austin...

  3. NORTH SAN MATEO COUNTY SANITATION DISTRICT December 1, 2014

    E-Print Network [OSTI]

    US Army Corps of Engineers

    NORTH SAN MATEO COUNTY SANITATION DISTRICT December 1, 2014 US Army Corps of Engineers, Attn: CECW, on behalf of its subsidiary, the North San Mateo County Sanitation District, consistent with the Water of Daly City, California, on behalf of its subsidiary, the North San Mateo County Sanitation District. 2

  4. A TURKEY NESTING STUDY IN GREGORY COUNTY, SOUTH DAKOTA

    E-Print Network [OSTI]

    A TURKEY NESTING STUDY IN GREGORY COUNTY, SOUTH DAKOTA by Tara L. Wertz A thesis submitted Sciences (Wildlife Option) South Dakota State University 1986 #12;A TURKEY NESTING STUDY IN GREGORY COUNTY. of Wildlife and Fisheries Sciences 11 Date Date #12;A TURKEY NESTING STUDY IN GREGORY COUNTY, SOUTH DAKOTA

  5. The University of Maryland Baltimore County Interim Policy on Prohibited

    E-Print Network [OSTI]

    Suri, Manil

    The University of Maryland Baltimore County Interim Policy on Prohibited Sexual Misconduct.20.01 Policy on Sexual Harassment #12;INTRODUCTION The University of Maryland, Baltimore County ("University the rights of all parties involved in the process. #12;University of Maryland Baltimore County Notice of Non

  6. University of Maryland Baltimore County Office of Sponsored Programs

    E-Print Network [OSTI]

    Maryland, Baltimore County, University of

    University of Maryland Baltimore County Office of Sponsored Programs SUBRECPIENT AND VENDOR. Will the University of Maryland Baltimore County be able to complete reports about the project without that is unique to the project and minimal supervision from the PI at the University of Maryland Baltimore County

  7. UNIVERSITY OF MARYLAND BALTIMORE COUNTY SUBSTANCE ABUSE POLICY

    E-Print Network [OSTI]

    Biswas, Animikh

    UNIVERSITY OF MARYLAND BALTIMORE COUNTY SUBSTANCE ABUSE POLICY AND CAMPUS PLAN The use and students of the University of Maryland Baltimore County. I. GUIDELINES A. The University of Maryland Baltimore County (UMBC), as an employer, strives to maintain a workplace free from the illegal use

  8. Vulnerability Assessment for Hood County, TX 

    E-Print Network [OSTI]

    Aldalbahi, Farisal; Cousins, Tiffany; Franks, Kristie; Hamidah, Nur; Herring, Kalen; Kirimli, Ridvan; Rojas, Ricardo Maga; McCharen, Robert; Paiz-Tabash, William; Phillips, Ellen; Thapa, Jeewasmi; Wallick, Andrew; Yan, Wenqian; Zhang, Yixun

    2015-01-01

    Looking forward, we mapped the 100-year and 500-year floodplains in the County. A 100-year floodplain indicates areas that have a 1% chance each year of flooding. The majority of the floodplain follows the Brazos River, as would be expected, and its...

  9. Wood River Levee Reconstruction, Madison County, IL

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Wood River Levee Reconstruction, Madison County, IL 25 October 2006 Abstract: The recommended plan provides for flood damage reduction and restores the original degree of protection of the Wood River Levee-federal sponsor is the Wood River Drainage and Levee District. The Wood River Levee System was authorized

  10. State of California County of Los Angeles

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Exhibit F #12;State of California County of Los Angeles West Basin Municipal Water District ) ) ) ) CERTIFICATION ss I, Charlene Jensen, Secretary of West Basin Municipal Water District and of the Board. 10-14-998 "A RESOLUTION OF THE BOARD OF DIRECTORS OF THE WEST BASIN MUNICIPAL WATER DISTRICT

  11. Baker County Cooperative Extension 2014 Annual Report

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    SELECTED ECONOMIC IMPACTS Restricted pesticide license holders were provided with 75.5 credit hours% of the funding comes from the state and federal level. #12;AWARDS / HONORS Florida Association of County Piece Individual Award (S. Bennett) Florida Association of Extension 4-H Agents-- Literature Award

  12. Wind Energy Guide for County Commissioners

    SciTech Connect (OSTI)

    Costanti, M.

    2006-10-01

    One of the key stakeholders associated with economic development are local government officials, who are often required to evaluate and vote on commercial wind energy project permits, as well as to determine and articulate what wind energy benefits accrue to their counties. Often these local officials lack experience with large-scale wind energy and need to make important decisions concerning what may be a complicated and controversial issue. These decisions can be confounded with diverse perspectives from various stakeholders. This project is designed to provide county commissioners, planners, and other local county government officials with a practical overview of information required to successfully implement commercial wind energy projects in their county. The guidebook provides readers with information on the following 13 topics: Brief Wind Energy Overview; Environmental Benefits; Wind Energy Myths and Facts; Economic Development Benefits; Wind Economics; The Development Process; Public Outreach; Siting Issues; Property Tax Incentives; Power System Impacts; Permitting, Zoning, and Siting Processes; Case Studies; and Further Information. For each of the above topics, the guidebook provides an introduction that identifies the topic, why local government should care, a topic snapshot, how the topic will arise, and a list of resources that define and assess the topic.

  13. Biofuel Plant, Clearfield County, PA Human Dimensions

    E-Print Network [OSTI]

    Omiecinski, Curtis

    to communicate effectively with stakeholders affected by natural resource and envi ronmental change issuesBiofuel Plant, Clearfield County, PA Human Dimensions of Natural Resources and the Environment Intercollege DualTitle Program For more information, please contact: Human Dimensions of Natural Resources

  14. Comparisons of cat and dog rabies vaccination rates between epizootic to non-epizootic counties and urban to rural counties in the state of Texas 

    E-Print Network [OSTI]

    Martin-Harborth, Michelle Lynn

    1999-01-01

    come into contact with wildlife. This study was undertaken compare the vaccination rates of cats and dogs the epizootic counties the non-epizootic counties to see if the rabies increase vaccination of cats and dogs the epizootic counties. Comparisons...

  15. The look of the fair : Kansas county fairscapes, 1854-1994

    E-Print Network [OSTI]

    Ambler, Cathy J.

    1996-01-01

    , Seneca. 1889 Sanborn Fire Insurance 119 Figure 66. Pottawatomie County, Onaga, 1910. KSHS Photo Collection. 119 Figure 67. Decatur County, Oberlin. Photo by author 120 Figure 68. Logan County, Oakley, 1912. Courtesy of the Fick Fossil Museum 121... County, Pratt, Pole Barn. Photo by author 277 Figure 140. Nemaha County, Seneca. Photo by author 288 Figure 141. Barton County, Great Bend. Photo by author 289 Figure 142. Trego County, Wakeeney, Horse Arena. Photo by author. .291 Figure 143. Crawford...

  16. Morris County Improvement Authority, Morris County, New Jersey Renewable Energy Initiative

    SciTech Connect (OSTI)

    Bonanni, John Chair, Morris County Improvement Authority

    2013-05-01

    The Morris County Improvement Authority (?Authority?), a public body corporate and politic of the State of New Jersey and created and controlled by the County, at the direction of the County and through the Program guaranteed by the County, financed 3.2 MW of solar projects (?Solar Projects?) at fifteen (15) sites for seven (7) local government units (?Local Units?) in and including the County. The Program uses a Power Purchase Agreement (?PPA?) structure, where the Solar Developer constructs, operates and maintains all of the Solar Projects, for the benefit of the Local Units and the Authority, for the maximum State law allowable PPA period of fifteen (15) years. Although all fifteen (15) sites were funded by the Authority, only the Mennen Arena site was considered for the purposes of the required local match funding for this grant. Specifically at the Mennen Arena site, the Authority financed 1.6 MW of solar panels. On October 18, 2013, the DOE Grant was drawn down following completion of the necessary application documents and final execution of an agreement memorializing the contemplated transaction by the Local Units, the County, The Authority and the solar developer. The proceeds of the DOE Grant were then applied to reduce the PPA price to all Local Units across the program and increase the savings from approximately 1/3 to almost half off the existing and forecasted utility pricing over the fifteen (15) year term, without adversely affecting all of the other benefits. With the application of the rate buy down, the price of electricity purchased under the PPA dropped from 10.9 to 7.7 cents/kWh. This made acquisition of renewable energy much more affordable for the Local Units, and it enhanced the success of the program, which will encourage other counties and local units to develop similar programs.

  17. Exploration Technologies - Technology Needs Assessment

    SciTech Connect (OSTI)

    Greene, Amanda I.; Thorsteinsson, Hildigunnur; Reinhardt, Tim; Solomon, Samantha; James, Mallory

    2011-06-01

    This assessment is a critical component of ongoing technology roadmapping efforts, and will be used to guide the Geothermal Technology Program's research and development.

  18. Si Brilliant Technology Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity for LowInformationShoshone County,Si Brilliant Technology Ltd

  19. Siemens Corporate Technology CT | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity for LowInformationShoshone County,SiCorporate Technology CT

  20. Bexar County Parking Garage Photovoltaic Panels

    SciTech Connect (OSTI)

    Golda Weir

    2012-01-23

    The main objective of the Bexar County Parking Garage Photovoltaic (PV) Panel project is to install a PV System that will promote the use of renewable energy. This project will also help sustain Bexar County ongoing greenhouse gas emissions reduction and energy efficiency goals. The scope of this project includes the installation of a 100-kW system on the top level of a new 236,285 square feet parking garage. The PV system consists of 420 solar panels that covers 7,200 square feet and is tied into the electric-grid. It provides electricity to the office area located within the garage. The estimated annual electricity production of the PV system is 147,000 kWh per year.

  1. Thermally Activated Technologies Technology Roadmap, May 2003...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermally Activated Technologies Technology Roadmap, May 2003 Thermally Activated Technologies Technology Roadmap, May 2003 The purpose of this Technology Roadmap is to outline a...

  2. New England Real Estate Journal February 21 -27, 2014 11BVisit the paper online nerej.com Connecticut MetroHartford Alliance/Greater Hartford County

    E-Print Network [OSTI]

    Oliver, Douglas L.

    .com Connecticut MetroHartford Alliance/Greater Hartford County MetroHartford Alliance Sandra Johnson Metro Connecticut-Israel Technology Summit. Thiseventbroughttogether CEO's from Israel who interfaced with Connecticut leaders, venture capitalists, academia and business. These attendees not only flew in from Israel

  3. Integration of oxygen plants and gas turbines in IGCC facilities

    SciTech Connect (OSTI)

    Smith, A.R.; Sorensen, J.C.; Woodward, D.W.

    1996-10-01

    The commercialization of Integrated Gasification Combined-Cycle (IGCC) power has been aided by concepts involving the integration of a cryogenic air separation unit (ASU) with the gas turbine combined-cycle module. It is known and now widely accepted that an ASU designed for elevated pressure service and optimally integrated with the gas turbine can increase overall IGCC power output, increase overall efficiency, and decrease the net cost of power generation compared to non-integrated facilities employing low pressure ASU`s. Depending upon the specific gas turbine, gasification technology, NO{sub x} emission specification, and other site specific factors, various degrees of compressed air and nitrogen integration are optimal. Air Products has supplied ASU`s with no integration (Destec/Plaquemine IGCC), nitrogen-only integration (Tampa Electric/Polk County IGCC), and full air and nitrogen integration (Demkolec/Buggenum IGCC). Continuing advancements in both air separation and gas turbine technologies offer new integration opportunities to further improve performance and reduce costs. This paper reviews basic integration principles, highlights the integration scheme used at Polk County, and describes some advanced concepts based on emerging gas turbines. Operability issues associated with integration will be reviewed and control measures described for the safe, efficient, and reliable operation of these facilities.

  4. Clark County- Solar and Wind Building Permit Guides

    Broader source: Energy.gov [DOE]

    Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

  5. VALUE DISTRIBUTION ASSESSMENT OF GEOTHERMAL DEVELOPMENT IN LAKE COUNTY, CA

    E-Print Network [OSTI]

    Churchman, C.W.

    2011-01-01

    Seismic Safety Commission CALTRAN Regional Water Quality Control Board REGIONAL GRIPS (Geothermal Resources Impact and'Planning Study) LAKE COUNTY Supervisors Planning Commission Environmental Assessment

  6. Johnson County REMC- Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Johnson County REMC offers rebates to commercial and industrial customers who install or replace new motors, variable frequency drives, air conditioners, heat pump systems and lighting equipment....

  7. Johnson County REMC- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Johnson County Rural Electric Membership Cooperative offers rebates to residential customers who install or replace new water heating and HVAC equipment. Rebates are available on the purchase and...

  8. VALUE DISTRIBUTION ASSESSMENT OF GEOTHERMAL DEVELOPMENT IN LAKE COUNTY, CA

    E-Print Network [OSTI]

    Churchman, C.W.

    2011-01-01

    Eleven: Lake County Geothermal Energy Resource. . . .of Susanville, Susanville Geothermal Energy Project Workshopparts of the state. Geothermal energy is only one of Lake

  9. Florida County Helping Homeowners Save Energy and Money | Department...

    Energy Savers [EERE]

    rebate and loan amounts. This collaborative effort is the result of local EECBG formula recipients coming together to provide the maximum benefits to Sarasota County...

  10. Lake County- Energy Smart Colorado Renewable Energy Rebate Program

    Broader source: Energy.gov [DOE]

    Residents of Roaring Fork Valley and Eagle, Gunnison, Lake, and Summit Counties are eligible for energy efficiency and renewable energy assistance, rebates, and financing through the Energy Smart...

  11. Eagle County- Energy Smart Colorado Renewable Energy Rebate Program

    Broader source: Energy.gov [DOE]

    Residents of Roaring Fork Valley and Eagle, Gunnison, Lake, and Summit Counties are eligible for energy efficiency and renewable energy assistance, rebates, and financing through the Energy Smart...

  12. Summit County- Energy Smart Colorado Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Residents of Roaring Fork Valley and Eagle, Gunnison, Lake, and Summit Counties are eligible for energy efficiency and renewable energy assistance, rebates, and financing through the Energy Smart...

  13. Fayette County, Pennsylvania Data Dashboard | Department of Energy

    Energy Savers [EERE]

    a partner in the Better Buildings Neighborhood Program. Fayette County, Pennsylvania Data Dashboard More Documents & Publications Cincinnati Data Dashboard Maine -- SEP...

  14. EECBG Success Story: Software Helps Kentucky County Gauge Energy...

    Broader source: Energy.gov (indexed) [DOE]

    million Energy Efficiency and Conservation Block Grant (EECBG) to purchase EnergyCAP software. The energy management software will allow the county to track energy usage and...

  15. Cellulosic emissions (kg of pollutant per km2 county area) -...

    Open Energy Info (EERE)

    Cellulosic emissions (kg of pollutant per km2 county area) Data reflects projected air emissions of nitrogen oxides (NOX), ammonia (NH3), carbon monoxide (CO), sulfur oxide (SOX),...

  16. Okanogan County PUD- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Public Utility District No. 1 of Okanogan County provides rebates to residential customers for purchasing energy efficient appliances. The qualifying appliance must be installed in a location that...

  17. Lake County - Energy Smart Colorado Renewable Energy Rebate Program...

    Open Energy Info (EERE)

    Lake County - Energy Smart Colorado Renewable Energy Rebate Program (Colorado) No revision has been approved for this page. It is currently under review by our subject matter...

  18. How One Delaware County is Saving Money and Creating Jobs

    Broader source: Energy.gov [DOE]

    New Castle County will carry out 158 conservation measures, including heat pump and boiler replacements, high-efficiency motors, lighting retrofits and controls, and a white reflective roof.

  19. Renewable Energy Deployment Projects for Forest County Potawatomi...

    Broader source: Energy.gov (indexed) [DOE]

    Wisconsin. Photo from Forest County Potawatomi Community Anaerobic digesters reduce pollution and generate electricity in Milwaukee. Anaerobic digesters reduce pollution and...

  20. Eagle County, Colorado Data Dashboard | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Neighborhood Program. Eagle County Data Dashboard More Documents & Publications Austin Energy Data Dashboard Massachusetts -- SEP Data Dashboard Phoenix, Arizona Data Dashboard...

  1. Morgan County REA- Efficiency Credit/Rebate Programs

    Broader source: Energy.gov [DOE]

    Morgan County REA (MCREA), in conjunction with Tri-State Generation and Transmission Association, provides financial incentives for all ratepayers to improve the energy efficiency of homes and...

  2. Fayette County Training Makes All the Difference for Pennsylvania...

    Broader source: Energy.gov (indexed) [DOE]

    a subgrant through the Fayette County Better Buildings Initiative, the Pathways Out Of Poverty program helped Gallo develop building science skills to improve homes with energy...

  3. Gunnison County Electric- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Gunnison County Electric Association (GCEA), a Touchstone Energy Cooperative, has a residential rebate program for eligible Energy Star appliances including clothes washers, dishwashers,...

  4. PP-118 Hill County Electric Cooperative Inc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documents & Publications EA-118 Hill County Electric Cooperative, Inc. PP-305 Montana Alberta Tie Ltd Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie...

  5. Eagle County - Energy Smart Colorado Energy Efficiency Rebate...

    Open Energy Info (EERE)

    Eagle County - Energy Smart Colorado Energy Efficiency Rebate Program (Colorado) No revision has been approved for this page. It is currently under review by our subject matter...

  6. EECBG Success Story: The Jury's In: Hillsborough County Courthouse...

    Office of Environmental Management (EM)

    of Sallie Glaize EECBG Success Story: Reducing Energy Costs and Rebuilding the Past Solar panels have been installed at a shelter facility near Ulster County Fairgrounds. |...

  7. Clean Cities: Western Riverside County Clean Cities coalition

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    region of Riverside County. Designated: October 24, 1997 Alternative Fueling Stations: Natural Gas: 5 Electric: 34 Propane: 6 Petroleum and GHG Savings* Total Gallons Saved Total...

  8. Harford County- Property Tax Credit for Solar and Geothermal Devices

    Broader source: Energy.gov [DOE]

    Harford County offers a tax credit from real property taxes imposed on residential buildings, nonresidential buildings, or other structures that use solar or geothermal devices for heating, cooling...

  9. Santa Clara Valley Transportation Authority and San Mateo County...

    Energy Savers [EERE]

    Santa Clara Valley Transportation Authority and San Mateo County Transit District Fuel Cell Transit Buses: Preliminary Evaluation Results vtaprelimevalresults.pdf More...

  10. Santa Clara Valley Transportation Authority and San Mateo County...

    Energy Savers [EERE]

    Santa Clara Valley Transportation Authority and San Mateo County Transit District -- Fuel Cell Transit Buses: Evaluation Results Santa Clara Valley Transportation Authority and San...

  11. Los Angeles County Makeover Contest Attracts More Than Just Winners...

    Broader source: Energy.gov (indexed) [DOE]

    words 'Energy Upgrade California.' Six homeowners from Los Angeles County will receive free home energy makeovers from a contest organized by Energy Upgrade California in Los...

  12. EECBG Success Story: County Partners with Siemens on Energy Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the county government center, and a public...

  13. Four-County EMC- Residential Energy Efficiency Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Four-County EMC offers its customers $50 rebates for purchasing certain Energy Star appliances. Eligible appliances include refrigerators, dishwashers, clothes washers and freezers. The rebates are...

  14. Institutional-building grants program: the county-government perspective

    SciTech Connect (OSTI)

    Flick, S.

    1982-03-01

    The National Association of Counties Research, Inc. (NACoR) energy team developed a questionnaire on the Institutional Buildings Grant Program (IBGP) and distributed it to every county government in the country. Responses were received from approximately 600 counties in 47 states (a response rate of about 20%). After completing a preliminary review of the questionnaire findings, NACoR conducted six case studies to identify the various methods state energy offices and county governments used to implement the IBGP. The case studies presented here are divided into two groups: examples of successful state IBGP's - New York, Washington, and Wisconsin; and examples of unsuccessful state IBGP's - California, North Carolina, and South Carolina. (MHR)

  15. Cowlitz County PUD- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Cowlitz County PUD offers the Commercial Energy Efficiency Program (CEEP) for non-residential customers to improve the efficiency of facilities. The program offers incentives on lighting, custom...

  16. Prince George's County- Solar and Geothermal Residential Property Tax Credit

    Broader source: Energy.gov [DOE]

    In 2008 Prince George's County enacted legislation offering a property tax credit on residential structures equipped with solar and geothermal systems. As originally devised, the credit could only...

  17. Douglas County School District (Nevada) Bonds Case Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonds Case Study Douglas County School District faced a challenging combination of aging equipment and buildings (most over 37 years old), rising energy costs, and limited...

  18. On the Natural Geography of North San Diego County

    E-Print Network [OSTI]

    Berger, Wolfgang H

    2013-01-01

    ON THE NATURAL GEOGRAPHY OF NORTH SAN DIEGO COUNTY (Essaymajor divisions of the physical geography, which is stronglythe access to the physical geography and the climatology of

  19. Energy Improvements in Greenville County: Rebuild South Carolina Partner Invests in Energy Efficiency 'One Step at a Time'

    SciTech Connect (OSTI)

    2003-11-01

    This document describes how Greenville County, South Carolina, implemented lighting and HVAC retrofits on their county hall.

  20. The Impacts of Alternative Patterns of Urbanization on Greenhouse Gas Emissions in an Agricultural County

    E-Print Network [OSTI]

    Wheeler, Stephen

    2013-01-01

    in energy use, with net-zero-energy development beingThe county’s ?rst net-zero-energy neighborhood, UC Davis

  1. Polk City, Iowa: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas: Energy Resources

  2. Village of Polk, Nebraska (Utility Company) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop IncIowa (Utility Company)Idaho) Jump to:NewVermont (UtilityCity, OhioVillage

  3. Dane County Landfill | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, Alabama (UtilityInstruments Inc JumpIowa: Energy Resources JumpDane County Landfill

  4. Los Alamos County | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona:Oregon: EnergyLloyd, NewBranchLongweiLos Alamos County Jump to:

  5. Olmsted County Public Works | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information Olinda Landfill GasI Geothermal PowerCounty

  6. Employee Headcount by County of Residence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES ScienceInformation CompanyEmployee Headcount by County of

  7. Northern Wasco County PUD | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoop Inc Jump to:Newberg, Oregon: EnergyNongqishiClean CitiesWasco County PUD Jump to:

  8. Fannin County Electric Coop | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EA Jump to:ofEnia SpA JumpGmbH EFCFBA FrancoFREDFannin County Electric

  9. Solano County Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS ReportEurope GmbH JumpSlough HeatMccoy GeothermalSolaicxSolano County

  10. Solar Maid Ventura County | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS ReportEurope GmbH JumpSloughInfra Inc Jump to:Maid Ventura County

  11. Category:Counties | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,Cammack Village,8199089°,Analytical ModelingInformationCounties Jump

  12. Boone County Rural EMC | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformationBio-GasIllinois:Energy Authority JumpBondSprings,FacilityCounty

  13. Grant County Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View New Pages RecentPlantMagma EnergyGoogle lendsCouleeIIReliableCounty

  14. Day County Wind Project | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePower VenturesInformation9) WindGrid Project)AreaDay County Wind Project

  15. CUSD3 Fulton County | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County, California: Energy ResourcesCRED: A New Model of

  16. Property:Building/County | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII JumpQuarterly SmartDB-2,InformationAwardee JumpBrineConstituentsCounty Jump

  17. Los Angeles County, California | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPA PublicLED1,400 Jobs | DepartmentSummaryLosLos Angeles County,

  18. New Hampshire 4-H ESE Chaperone Application Name: County

    E-Print Network [OSTI]

    New Hampshire, University of

    New Hampshire 4-H ESE Chaperone Application Name: County: Address: Street City State Zip Phone and regulations of New Hampshire 4-H and Eastern States Exposition with respect to conduct and responsibility. I: County 4-H Extension Educator Visit our website: extension.unh.edu. Reformatted Aug 2011 [New Logo June

  19. PESTICIDE OCCURRENCE IN GROUNDWATER IN TULARE COUNTY, CALIFORNIA

    E-Print Network [OSTI]

    Zhang, Minghua

    PESTICIDE OCCURRENCE IN GROUNDWATER IN TULARE COUNTY, CALIFORNIA MINGHUA ZHANG1 , SHU GENG2 , SUSAN to identify the major factors affecting pesticide leaching in groundwater from agricultural fields in Tulare between 1970 and 1982 (Cohen, 1986). Forty-nine percent of the wells sampled in Tulare County (Troiano

  20. EIS-0409: Kemper County Integrated Gasification Combined Cycle Project, Mississippi

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to provide funding for the Kemper County Integrated Gasification Combined Cycle Project in Kemper County, Mississippi to assess the potential environmental impacts associated with the construction and operation of a project proposed by Southern Power Company, through its affiliate Mississippi Power Company, which has been selected by DOE for consideration under the Clean Coal Power Initiative (CCPI) program.

  1. ToledoLucas County Public Library: Economic Value

    E-Print Network [OSTI]

    Azad, Abdul-Majeed

    in a cost-efficient way. To quantify the taxpayer's return from investment in TLCPL, the critical task of personal income, was used to fund Library activities from Lucas county property tax. The annual cost Library materials, computers, and specialists. In contrast, per capita income in Lucas County, OH in 2009

  2. ORESTIMBA CREEK, WEST STANISLAUS COUNTY, CA FLOOD RISK MANAGEMENT PROJECT

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ORESTIMBA CREEK, WEST STANISLAUS COUNTY, CA FLOOD RISK MANAGEMENT PROJECT 29 May 2013 ABSTRACT flood risk management for the City of Newman, Stanislaus County, California and the surrounding area public health risks caused by area flooding included contamination of domestic water wells and inundation

  3. St. Louis Sites Fact Sheet NORTH ST. LOUIS COUNTY

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ), the Latty Avenue Properties including the Hazelwood Interim Storage Site (HISS) and the Futura CoatingsSt. Louis Sites Fact Sheet NORTH ST. LOUIS COUNTY SITES RECORD OF DECISION "Gateway to Excellence" U.S. Army Corps of Engineers St. Louis District The North St. Louis County Sites Record of Decision

  4. University of Maryland Baltimore County High Speed Optical Networking

    E-Print Network [OSTI]

    Srinivasan, Aravind

    University of Maryland Baltimore County 1 High Speed Optical Networking Task 3: Progress Report are needed to see this picture. Sponsored Presented @ LTS, 27 June 2003 #12;University of Maryland Baltimore-Ideal) Assessment via Implementation Issues #12;University of Maryland Baltimore County 3 FEC Code Design: RCD Codes

  5. Measuring availability of healthful foods in two rural Texas counties 

    E-Print Network [OSTI]

    Bustillos, Brenda Diane

    2009-05-15

    A comprehensive in-store survey may capture the availability of healthful food alternatives in different store types in two rural counties. The purpose of this study was to: (1) compare the availability of healthful foods in two rural Texas counties...

  6. SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Section 17

    E-Print Network [OSTI]

    66 26 76 26 26 26 SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Section 17 0 300 600 900 1,200150 Feet 0 100 20050 Meters Web Soil Survey 1.1 National Cooperative Soil Survey 5/7/2007 Page 1 of 3 #12;MAP INFORMATION SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Section 17 Source of Map: Natural Resources

  7. LittleRockCreek SOIL SURVEY OF ATOKA COUNTY, OKLAHOMA

    E-Print Network [OSTI]

    Ghajar, Afshin J.

    Atoka Oklahoma 7 17 64 8 15 68 15 12 W 7 16 12 43 16 7 43 68 12 1111 222800 222800 223000 223000 223200 COUNTY, OKLAHOMA Wes Watkins Agricultural Research and Extension Center 0 700 1,400 2,100 2,800350 Feet 0 INFORMATION SOIL SURVEY OF ATOKA COUNTY, OKLAHOMA Wes Watkins Agricultural Research and Extension Center

  8. Small Power Plant Exemption (06-SPPE-1) Imperial County

    E-Print Network [OSTI]

    Small Power Plant Exemption (06-SPPE-1) Imperial County NILAND GAS TURBINE PLANT COMMISSIONDECISION ENERGY COMMISSION Small Power Plant Exemption (06-SPPE-1) Imperial County NILAND GAS TURBINE PLANT GAS TURBINE PLANT SMALL POWER PLANT EXEMPTION DOCKET NO. 06-SPPE-1 The California Energy Commission

  9. HEALTH IMPACT ASSESSMENT Clark County Bicycle & Pedestrian Master Plan

    E-Print Network [OSTI]

    Bertini, Robert L.

    HEALTH IMPACT ASSESSMENT Clark County Bicycle & Pedestrian Master Plan October, 2010 Brendon Haggerty, Clark County Public Health Brendon.haggerty@clark.wa.gov #12;Overview · Introduction to HIA · Bicycle & Pedestrian Master Plan HIA · Lessons learned #12;Health Impact Assessment Screening · Scoping

  10. Flagler County, Florida Hurricane and Storm Damage Reduction Project

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Flagler County, Florida Hurricane and Storm Damage Reduction Project 26 August 2014 ABSTRACT: The proposed Flagler County hurricane and storm damage reduction project is located on the northeast coast miles of shoreline to assess the feasibility of providing Federal Hurricane and Storm Damage Reduction

  11. High Impact Technology Catalyst: Technology Deployment Strategies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Impact Technology Catalyst: Technology Deployment Strategies High Impact Technology Catalyst: Technology Deployment Strategies The Energy Department released the High Impact...

  12. Vehicle Technologies Office: 2014 Electric Drive Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technologies Office: 2014 Electric Drive Technologies Annual Progress Report Vehicle Technologies Office: 2014 Electric Drive Technologies Annual Progress Report The...

  13. Building an Antislavery House: Political Abolitionists and the U.S. Congress

    E-Print Network [OSTI]

    Brooks, Corey Michael

    2010-01-01

    Sellers, Charles G. James K. Polk Continentalist. Princeton,Ibid. ; Flagg supported James Polk‘s candidacy and assertedthe previous speaker James Polk now governor of Tennessee.

  14. January 24, 2008 12:13 WSPC/INSTRUCTION FILE pcsq10 Polynomial clones on squarefree groups

    E-Print Network [OSTI]

    := Zp2 , +, px1 . . . xk for k N, that satisfy Polk(Ak) = Polk(Ak+1) and Polk+1(Ak) Polk+1(Ak+1). Hence

  15. An Archaeological Survey of the 23 Acre Matagorda County Birding Nature Center in North Central Matagorda County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-10

    Brazos Valley Research Associates (BVRA) conducted a 100% pedestrian survey of a 23 acre tract of land, the site of the proposed Matagorda County Birding Nature Center in north-central Matagorda County, Texas on May 9-10, 1999. Both State...

  16. An Archaeological Survey for the Coleman County Special Utility District Phase 7 Water Line Project in Coleman County Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-30

    An archaeological survey of three segments of a proposed 26.1 mile water line and a 60 foot x 60 foot tract that will be the site of proposed expansion to an existing water storage tank in central County County, Texas was performed on October 14...

  17. Starr County is located in South Texas, Rio Grande Valley, and is a border county with Mexico to the South.

    E-Print Network [OSTI]

    farmer's market reached over 13,500 Starr County residents within identified food deserts and colonias areas. Over 86,400 pounds of locally grown produce was sold at 25 mobile market sites. · Ten school, and area church and food pantries. Transformation Grant: Starr County Project #12;· One community park

  18. Technology '90

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The US Department of Energy (DOE) laboratories have a long history of excellence in performing research and development in a number of areas, including the basic sciences, applied-energy technology, and weapons-related technology. Although technology transfer has always been an element of DOE and laboratory activities, it has received increasing emphasis in recent years as US industrial competitiveness has eroded and efforts have increased to better utilize the research and development resources the laboratories provide. This document, Technology '90, is the latest in a series that is intended to communicate some of the many opportunities available for US industry and universities to work with the DOE and its laboratories in the vital activity of improving technology transfer to meet national needs. Technology '90 is divided into three sections: Overview, Technologies, and Laboratories. The Overview section describes the activities and accomplishments of the DOE research and development program offices. The Technologies section provides descriptions of new technologies developed at the DOE laboratories. The Laboratories section presents information on the missions, programs, and facilities of each laboratory, along with a name and telephone number of a technology transfer contact for additional information. Separate papers were prepared for appropriate sections of this report.

  19. Technology Assessment

    Office of Environmental Management (EM)

    capabilities that are energy efficient, low environmental impact 72 and lower cost and that are employed to manufacture technologies and products for clean energy 73...

  20. York County Energy Partners CFB Cogeneration Project. Annual report, [September 30, 1992--September 30, 1993

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Department of Energy, under the Clean Coal Technology program, proposes to provide cost-shared financial assistance for the construction of a utility-scale circulating fluidized bed technology cogeneration facility by York County Energy Partners, L.P (YCEP). YCEP, a project company of ir Products and Chemicals, Inc., would design, construct and operate a 250 megawatt (gross) coal-fired cogeneration facility on a 38-acre parcel in North Codorus Township, York County, Pennsylvania. The facility would be located adjacent to the P. H. Glatfelter Company paper mill, the proposed steam host. Electricity would be delivered to Metropolitan Edison Company. The facility would demonstrate new technology designed to greatly increase energy efficiency and reduce air pollutant emissions over current generally available commercial technology which utilizes coal fuel. The facility would include a single train circulating fluidized bed boiler, a pollution control train consisting of limestone injection for reducing emissions of sulfur dioxide by greater than 92 percent, selective non-catalytic reduction for reducing emissions of nitrogen oxides, and a fabric filter (baghouse) for reducing emissions of particulates. Section II of this report provides a general description of the facility. Section III describes the site specifics associated with the facility when it was proposed to be located in West Manchester Township. After the Cooperative Agreement was signed, YCEP decided to move the proposed site to North Codorus Township. The reasons for the move and the site specifics of that site are detailed in Section IV. This section of the report also provides detailed descriptions of several key pieces of equipment. The circulating fluidized bed boiler (CFB), its design scale-up and testing is given particular emphasis.

  1. EA-1852: Cloud County Community College Wind Energy Project, Cloud County, Kansas

    Broader source: Energy.gov [DOE]

    This EA was to evaluate the environmental impacts of a proposal to authorize the expenditure of federal funds by Cloud County Community College (CCCC) for a wind energy project. CCCC has installed three wind turbines and proposed to install a fourth turbine on their campus in Concordia, Kansas, for use in their wind energy training curriculum and to provide electricity for their campus. This EA has been canceled.

  2. Jmtland County Energy Agency Comfortable use of wood pellets in one-family houses in

    E-Print Network [OSTI]

    Wind Other Financial institutions Geothermal Other Hydro power Other #12;Jämtland County Energy Agency

  3. Technology Commercialization Showcase 2008 Vehicle Technologies Program

    SciTech Connect (OSTI)

    Davis, Patrick B.

    2009-06-19

    Presentation illustrating various technology commercialization opportunities and unexploited investment gaps for the Vehicle Technologies Program.

  4. Thermally activated technologies: Technology Roadmap

    SciTech Connect (OSTI)

    None, None

    2003-05-01

    The purpose of this Technology Roadmap is to outline a set of actions for government and industry to develop thermally activated technologies for converting America’s wasted heat resources into a reservoir of pollution-free energy for electric power, heating, cooling, refrigeration, and humidity control. Fuel flexibility is important. The actions also cover thermally activated technologies that use fossil fuels, biomass, and ultimately hydrogen, along with waste heat.

  5. Lehigh County, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona: EnergyLebanon County,Leflore County,Lehigh County, Pennsylvania:

  6. Cambria County, Pennsylvania: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine:Kansas:Information(Redirected fromCounty,County,Cambria County,

  7. Bedford City County, Virginia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental JumpInformation Beaufort County, SouthBecker County,Bedford City County,

  8. sustainable technologies

    E-Print Network [OSTI]

    Zhang, Junshan

    : · realize continuous improvements in performance (efficiency), cost and manufacturability of PV technologies, transformative PV technologies that circumvent cost/performance trade-offs and maintain compatibility with P the growing demand for energy. Photovoltaics (PV) leverages one of the 20th century's greatest scientific

  9. INTERSTATE WASTE TECHNOLOGIES THERMOSELECT TECHNOLOGY

    E-Print Network [OSTI]

    Columbia University

    1 INTERSTATE WASTE TECHNOLOGIES THERMOSELECT TECHNOLOGY AN OVERVIEW Presented to the DELAWARE SOLID WASTE MANAGEMENT TECHNICAL WORKING GROUP January 10, 2006 #12;2 INTERSTATE WASTE MANAGEMENT ALLIANCE and maintenance (30 years) ­ Will guarantee performance and Operation and Maintenance ­ Serves solid waste

  10. An archaeological survey for McLennan County Electric Cooperative, Inc. 1990-1991 Work Plan System: Phase I: Two utility lines in McLennan County, Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-06-03

    An archaeological survey was conducted along two sections of county right-of-way in McLennan County, Texas by Brazos Valley Research Associates (BVRA). Fieldwork was performed on October 1, 1990. A pedestrian survey accompanied by shovel testing...

  11. El Dorado County Water Systems Energy Generation Project

    E-Print Network [OSTI]

    .energy.ca.gov/research/renewable/ May 2011 The Issue The water supply, conveyance, treatment, and hydroelectricity generation industry #12;CEC-500-2012-FS-014 · Analyzing the recommendations from a recent El Dorado County Hydroelectric

  12. San Antonio/Bexar County, Texas Urban Waters Project

    E-Print Network [OSTI]

    US Army Corps of Engineers

    San Antonio/Bexar County, Texas Urban Waters Project 2014 Work Plan Date: Project Location: San............................................................................... Project 2: Olmos Basin/San Antonio Zoo Water Quality and Ecosystem Restoration....... Project 3: Eastside.................................................................................................. Project 4: San Pedro Creek Restoration

  13. An Interindustry Model of El Paso and Hudspeth Counties, Texas 

    E-Print Network [OSTI]

    Coffman, W. S.; Beattie, B. R.; Jones, L. L.; Adams, J. W.

    1976-01-01

    Model of El Paso and Hudspeth Counties, Texas W.S. Coffman B.R. Beattie L.L. Jones J.W. Adams Texas Water Resources Institute Texas A&M University ...

  14. Thermal Waters Along The Konocti Bay Fault Zone, Lake County...

    Open Energy Info (EERE)

    Thermal Waters Along The Konocti Bay Fault Zone, Lake County, California- A Re-Evaluation Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article:...

  15. EECBG Success Story: Software Helps Kentucky County Gauge Energy...

    Office of Environmental Management (EM)

    Addthis Lexington-Fayette Urban County, Kentucky invested 140,000 of a 2.7 million Energy Efficiency and Conservation Block Grant (EECBG) to purchase EnergyCAP software. The...

  16. Inter-County Energy Touchstone New Construction Program (Kentucky)

    Broader source: Energy.gov [DOE]

    Inter-County Energy Cooperative provides incentives of up to $750 for homeowners that follow the Touchstone Energy Home standards when designing a new home. In order to participate in the program,...

  17. Snohomish County PUD No 1- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    To help customers remodeling or building a new home reduce lighting energy use, Snohomish County PUD No 1 offers a discount of $20 on a variety of CFL fixtures at participating local retailers. A...

  18. EECBG Success Story: Forsyth County Slashes Energy Bills with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2010 - 10:00am Addthis A new energy management system in Forsyth Countys 52,057 square foot courthouse is expected to save about 9,000 annually. | Photo courtesy of Forsyth...

  19. Boulder County- EnergySmart Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    EnergySmart for Boulder County helps residents identify, finance, and schedule energy improvements in their homes. This “One Stop Shop” aims to reduce the hassles and hurdles associated with...

  20. Cutting Electricity Costs in Miami-Dade County, Florida

    SciTech Connect (OSTI)

    Alvarez, Carlos; Oliver, LeAnn; Kronheim, Steve; Gonzalez, Jorge; Woods-Richardson, Kathleen;

    2011-01-01

    Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity needs.

  1. Georectification of Historic Aerial Photographs for Douglas County, Kansas (PRESENTATION)

    E-Print Network [OSTI]

    Houser, Rhonda

    2004-12-22

    This presentation describes a project to georeference and georectify historic aerial photographs for Douglas County in northeastern Kansas. The University of Kansas Libraries wanted to enhance an air photo archive and allow integration with other...

  2. Four-County EMC- Residential Energy Efficiency Loan Program

    Broader source: Energy.gov [DOE]

    Four-County EMC offers the Comfort Loan Program to residential customers. This program offers financing for insulation upgrades, the replacement of an existing heating/cooling system with an...

  3. Clallam County PUD- Residential and Small Business Solar Loan Program

    Broader source: Energy.gov [DOE]

    In conjunction with First Federal Savings and Loan, Clallam County PUD offers residential and small commercial customers a low-interest loan program for the purchase of solar photovoltaic systems....

  4. Cowlitz County PUD- Residential Energy Efficient Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Cowlitz County PUD offers the EnergySHARE Plus appliance rebate program to its residential customers. Rebates are offered for Energy Star clothes washers, refrigerators and freezers (including the...

  5. Manual of the dicot flora of Brazos and surrounding counties 

    E-Print Network [OSTI]

    Reed, Monique Dubrule

    1997-01-01

    Though Brazos and surrounding counties have been treated in previous botanical works, this represents the first complete, up to date work dedicated solely to the region's dicot flora. A checklist and complete key to family, ...

  6. Spatial Valuation of Open Space Externalities in Baltimore County, Maryland 

    E-Print Network [OSTI]

    Gurung, Kushal

    2012-11-08

    Different open space types are assumed to be valued in different ways by the public. This thesis analyzes four spatially explicit hedonic models of Baltimore County, Maryland to examine the effect of six different open spaces types on house value...

  7. Geology of the Florida Canyon gold deposit, Pershing County,...

    Open Energy Info (EERE)

    Geology of the Florida Canyon gold deposit, Pershing County, Nevada, in: Gold and Silver Deposits of Western Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to...

  8. Cutting Electricity Costs in Miami-Dade County, Florida

    Broader source: Energy.gov [DOE]

    Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity...

  9. Final Report: Feasibility Study of Biomass in Snohomish County, Washington

    SciTech Connect (OSTI)

    Daryl Williams; Ray Clark

    2005-01-31

    This report and its attachments summarizes the results of a unique tribal-farmer cooperative study to evaluate the feasibility of building one or more regional anaerobic digestion systems in Snohomish County, Washington.

  10. Miami-Dade County- Expedited Green Buildings Process

    Broader source: Energy.gov [DOE]

    In an effort to promote environmentally sensitive design and construction, the Miami-Dade County Commissioners passed an ordinance in June 2005 to expedite the permitting process for “green”...

  11. White County REMC- Residential Geothermal Heat Pump Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Additional rebates are available for White county REMC customers through the Power Moves program adminstered by the Wabash Valley Power Association.  Visit the Power Moves website for more inform...

  12. King County Metro Transit Hybrid Articulated Buses: Final Evaluation Results

    SciTech Connect (OSTI)

    Chandler, K.; Walkowicz, K.

    2006-12-01

    Final technical report compares and evaluates new diesel and diesel hybrid-electric articulated buses operated as part of the King County Metro Transit (KC Metro) fleet in Seattle, Washington. The evaluation lasted 12 months.

  13. Lewis County PUD- Residential Energy Efficiency Loan Program

    Broader source: Energy.gov [DOE]

    Lewis County offers loans for both single owner occupied residential and non-residential buildings. Applicants must pay a $200 loan origination fee, and abide by other program requirements....

  14. Cutting Electricity Costs in Miami-Dade County, Florida

    ScienceCinema (OSTI)

    Alvarez, Carlos; Oliver, LeAnn; Kronheim, Steve; Gonzalez, Jorge; Woods-Richardson, Kathleen;

    2013-05-29

    Miami-Dade County, Florida will be piping methane gas from their regional landfill to the adjacent wastewater plant to generate a significant portion of the massive facility's future electricity needs.

  15. Kalamazoo County Health Indicators Disaggregated by Race, Place and

    E-Print Network [OSTI]

    de Doncker, Elise

    ;5 Health Data for Kalamazoo County POVERTY,3 RACE, PLACE AND HEALTH: THE BIG PICTURE · Poverty and racial. · 14% of Michigan's population is classified as living in poverty compared to the nation

  16. Taylor County RECC- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Taylor County RECC offers rebates to residential customers for upgrading to energy efficient insulation and heat pumps. Under the Button-Up insulation upgrade program, a utility representative will...

  17. EECBG Success Story: Knox County Detention Facility Goes Solar...

    Broader source: Energy.gov (indexed) [DOE]

    An array of solar collectors | Photo courtesy of Trane An array of solar collectors | Photo courtesy of Trane Hot water demand soars at the six-building Knox County Detention...

  18. Hurricane Modification and Adaptation in Miami-Dade County, Florida

    E-Print Network [OSTI]

    Klima, Kelly

    We investigate tropical cyclone wind and storm surge damage reduction for five areas along the Miami-Dade County coastline either by hardening buildings or by the hypothetical application of wind-wave pumps to modify storms. ...

  19. Yell County, Arkansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:WizardYates County, New York: Energy ResourcesYell County,

  20. Yoakum County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:WizardYates County, New York: EnergyYoakum County, Texas:

  1. SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Section 4

    E-Print Network [OSTI]

    25 6 4 11 25 41 72 25 74 49 74 11 51 4926 26 74 26 26 26 SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Section 4 0 400 800 1,200 1,600200 Feet 0 100 20050 Meters Web Soil Survey 1.1 National Cooperative Soil Survey 5/7/2007 Page 1 of 3 #12;MAP INFORMATION SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Section 4

  2. PayneOklahoma SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA

    E-Print Network [OSTI]

    Ghajar, Afshin J.

    W ildhorse Creek E0660 RD EW 65 RD NS324RD E0650 RD COYLERD PayneOklahoma 66 26 62 40 6 11 74 65 26 SOIL SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Headquarters 0 700 1,400 2,100 2,800350 Feet 0 200 400100 SURVEY OF PAYNE COUNTY, OKLAHOMA OSURR Headquarters Source of Map: Natural Resources Conservation Service

  3. Handbook: County Program Building for Texas Agricultural Extension Workers. 

    E-Print Network [OSTI]

    1955-01-01

    prepare an organizational chart. This should show the membership of the county program building committee and sub-committee, the officers, term of office and the area of interest or organi- zation represented. The number of people on the county program.... Term of office shall be arranged so that one-third of the member- ship shall be selected each year. IV. CONSULTANTS. Representatives of Federal and State Government agencies, banks, chambers of commerce and other organizations shall be invited...

  4. Florida County Seeks to Reduce Emissions and Improve Traffic

    Office of Energy Efficiency and Renewable Energy (EERE)

    St. Johns County, Florida is tackling its traffic-timing problem with a little help from an Energy Department Energy Efficiency and Conservation Block grant. The county will use the grant to improve traffic flow by re-synchronizing signals at five major road segments. In total, 23 traffic signals will be retimed and synchronized, resulting in lower fuel consumption, shorter travel times, increased travel speed, less stopping and less engine idling.

  5. Gas Turbine Cogeneration Plant for the Dade County Government Center 

    E-Print Network [OSTI]

    Michalowski, R. W.; Malloy, M. K.

    1985-01-01

    COGENERATION PLANT FOR THE DADE COUNTY GOVERNMENT CENTER Roger W. Michalowski Michael K. Malloy Thermo Electron Corporation GEC Rolls-Royce Waltham, Massachusetts ABSTRACT A government complex consisting of a number of State, County, and City... of the complex. This $30 million cogeneration plant will occupy a portion of a multiple use building which will also house offices, indoor parking facilities, and additional building support systems. Locating such a powerplant in downtown Miami presents...

  6. Gulf County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERC Hydroelectric Projects |County, Florida: Energy

  7. Gunnison County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERC Hydroelectric Projects |County,GumuskoyGun

  8. Hall County, Nebraska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERCInformationVirginia: EnergyHall County,

  9. Hamblen County, Tennessee: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERCInformationVirginia:Hamblen County, Tennessee:

  10. Gordon County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia: Energy ResourcesIllinois:GoodCounty, Georgia:

  11. Leflore County, Mississippi: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona: EnergyLebanon County,Leflore County, Mississippi: Energy

  12. Lenawee County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona: EnergyLebanon County,LefloreInformationLenawee County,

  13. Mitigation of Coastal Bluff Instability in San Diego County, California/Evaluating Seacliff Morphology and Erosion Control in San Diego County Using LIDAR and GIS

    E-Print Network [OSTI]

    Ashford, Scott

    2005-01-01

    County Using LIDAR and GIS In order to evaluate seacliffgeographic information systems (GIS) analysis. LIDAR is the

  14. Technology Validation

    Broader source: Energy.gov [DOE]

    To reduce solar technology risks, DOE and its partners evaluate the performance and reliability of novel photovoltaic (PV) hardware and systems through laboratory and field testing. The focus of...

  15. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  16. Technology Roadmap Analysis 2013: Assessing Automotive Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Roadmap Analysis 2013: Assessing Automotive Technology R&D Relevant to DOE Power Electronics Cost Targets Technology Roadmap Analysis 2013: Assessing Automotive...

  17. ZipZone Technologies | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:WizardYates County,Zena, NewZhuluZipZone Technologies Jump

  18. Zolo Technologies Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:WizardYates County,Zena, NewZhuluZipZoneZolo Technologies

  19. Valence Technology Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin, New York:PowerNewPumatyUvalde County,Vade SolarValeTechnology

  20. Siemens Technology Accelerator | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity for LowInformationShoshone County,SiCorporate TechnologySA

  1. Power Technology Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas:Pottawattamie County,River,Generating IncTechnology Inc

  2. Prism Solar Technologies Inc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975)Energy Technology JumpWilliam County,| OpenEIPrism Solar

  3. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roland Risser Director, Building Technologies Office Building Technologies Office Energy Efficiency Starts Here. 2 Building Technologies Office Integrated Approach: Improving...

  4. Wolf Point Substation, Roosevelt County, Montana

    SciTech Connect (OSTI)

    Not Available

    1991-05-01

    The Western Area Power Administration (Western), an agency of the United States Department of Energy, is proposing to construct the 115-kV Wolf Point Substation near Wolf Point in Roosevelt County, Montana (Figure 1). As part of the construction project, Western's existing Wolf Point Substation would be taken out of service. The existing 115-kV Wolf Point Substation is located approximately 3 miles west of Wolf Point, Montana (Figure 2). The substation was constructed in 1949. The existing Wolf Point Substation serves as a Switching Station'' for the 115-kV transmission in the region. The need for substation improvements is based on operational and reliability issues. For this environmental assessment (EA), the environmental review of the proposed project took into account the removal of the old Wolf Point Substation, rerouting of the five Western lines and four lines from the Cooperatives and Montana-Dakota Utilities Company, and the new road into the proposed substation. Reference to the new proposed Wolf Point Substation in the EA includes these facilities as well as the old substation site. The environmental review looked at the impacts to all resource areas in the Wolf Point area. 7 refs., 6 figs.

  5. Guoneng Biologic Technology Consultancy Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERC HydroelectricGuofu Bioenergy Science Technology

  6. "Indian Rancherie on Dry Creek": An Early 1850s Indian Village on the Sacramento and San Joaquin County Line

    E-Print Network [OSTI]

    Farris, Glenn

    2008-01-01

    and West 1880 History of Sacramento County, California, withIndian Village on the Sacramento and San Joaquin CountyMap of the County of Sacramento, California by Drury Butler,

  7. Geothermal : Economic Impacts of Geothermal Development in Whatcom County, Washington.

    SciTech Connect (OSTI)

    Lesser, Jonathan A.

    1992-07-01

    This report estimates the local economic impacts that could be anticipated from the development of a 100 megawatt (MW) geothermal power plant in eastern Whatcom County, Washington, near Mt. Baker, as shown in Figure 1. The study was commissioned by the Bonneville Power Administration to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council. Whatcom County was chosen due to both identified geotherrnal resources and developer interest. The analysis will focus on two phases: a plant construction phase, including well field development, generating plant construction, and transmission line construction; and an operations phase. Economic impacts will occur to the extent that construction and operations affect the local economy. These impacts will depend on the existing structure of the Whatcom County economy and estimates of revenues that may accrue to the county as a result of plant construction, operation, and maintenance. Specific impacts may include additional direct employment at the plant, secondary impacts from wage payments being used to purchase locally produced goods and services, and impacts due to expenditures of royalty and tax payments received by the county. The basis for the analysis of economic impacts in this study is the US Forest Service IMPLAN input-output modeling system.

  8. Case Studies of the ROZ CO2 Flood and the Combined ROZ/MPZ CO2 Flood at the Goldsmith Landreth Unit, Ector County, Texas. Using “Next Generation” CO2 EOR Technologies to Optimize the Residual Oil Zone CO2 Flood

    SciTech Connect (OSTI)

    Trentham, Robert C.; Melzer, L. Stephen; Kuuskraa, Vello; Koperna, George

    2015-06-30

    The technology for CO2 Enhanced Oil Recovery (CO2 EOR) has significantly advanced since the earliest floods were implemented in the 1970s. At least for the Permian Basin region of the U.S., the oil recovery has been now been extended into residual oil zones (ROZs) where the mobile fluid phase is water and immobile phase is oil. But the nature of the formation and fluids within the ROZs has brought some challenges that were not present when flooding the MPZs. The Goldsmith-Landreth project in the Permian Basin was intended to first identify the most pressing issues of the ROZs floods and, secondly, begin to address them with new techniques designed to optimize a flood that commingled the MPZ and the ROZ. The early phase of the research conducted considerable reservoir and fluid characterization work and identified both technical and commercial challenges of producing the enormous quantities of water when flooding the ROZs. It also noted the differing water compositions in the ROZ as compared to the overlying MPZs. A new CO2 gas lift system using a capillary string was successfully applied during the project which conveyed the CO2 to the deeper and differing ROZ reservoir conditions at Goldsmith and added a second capillary string that facilitated applying scale inhibitors to mitigate the scaling tendencies of the mixing ROZ and MPZ formation waters. The project also undertook a reservoir modeling effort, using the acquired reservoir characterization data, to history match both the primary and water flood phases of the MPZ and to establish the initial conditions for a modeling effort to forecast response of the ROZ to CO2 EOR. With the advantage of many profile logs acquired from the operator, some concentration on the original pattern area for the ROZ pilot was accomplished to attempt to perfect the history match for that area. Several optional scenarios for producing the ROZ were simulated seeking to find the preferred mode of producing the two intervals. Finally, the project attempted to document for the first time the production performance of commingled MPZ and ROZ CO2 EOR project at the nearby Seminole San Andres Unit. The analysis shows that over 10,000 bopd can be shown to be coming from the ROZ interval, a zone that would have produced no oil under primary or water flood phases. A similar analysis was done for the GLSAU project illustrating that 2000 bopd of incremental EOR oil is currently being produced. The results of the modeling work would suggest that 800 bopd can be attributed to the ROZ alone at GLSAU.

  9. Engineering &Technology

    E-Print Network [OSTI]

    Southampton, University of

    Software Technologies Deloitte Dialog Semiconductor ECM Selection EDT-Year in Industry EMC Corporation to join our organisation and be based in our Ferndown, Dorset, location within our product electronics have application, design and manufacturing facilities in Canada, America, Europe and China. We

  10. Manufacturing technologies

    SciTech Connect (OSTI)

    1995-09-01

    The Manufacturing Technologies Center is an integral part of Sandia National Laboratories, a multiprogram engineering and science laboratory, operated for the Department of Energy (DOE) with major facilities at Albuquerque, New Mexico, and Livermore, California. Our Center is at the core of Sandia`s Advanced Manufacturing effort which spans the entire product realization process.

  11. Pyroprocessing Technologies

    E-Print Network [OSTI]

    Kemner, Ken

    of pyrochemical processes for the recycle of oxide, carbide and other advanced fuels and laid the foundationPyroprocessing Technologies RECYCLING USED NUCLEAR FUEL FOR A SUSTAINABLE ENERGY FUTURE #12;32 Storing Used Nuclear Fuel is a Real Waste Nuclear power is the most environmentally friendly way

  12. Building Technologies Office Overview

    SciTech Connect (OSTI)

    2013-04-01

    Building Technologies Office Overview Presentation for the 2013 Building Technologies Office's Program Peer Review

  13. Vacuum Technology

    SciTech Connect (OSTI)

    Biltoft, P J

    2004-10-15

    The environmental condition called vacuum is created any time the pressure of a gas is reduced compared to atmospheric pressure. On earth we typically create a vacuum by connecting a pump capable of moving gas to a relatively leak free vessel. Through operation of the gas pump the number of gas molecules per unit volume is decreased within the vessel. As soon as one creates a vacuum natural forces (in this case entropy) work to restore equilibrium pressure; the practical effect of this is that gas molecules attempt to enter the evacuated space by any means possible. It is useful to think of vacuum in terms of a gas at a pressure below atmospheric pressure. In even the best vacuum vessels ever created there are approximately 3,500,000 molecules of gas per cubic meter of volume remaining inside the vessel. The lowest pressure environment known is in interstellar space where there are approximately four molecules of gas per cubic meter. Researchers are currently developing vacuum technology components (pumps, gauges, valves, etc.) using micro electro mechanical systems (MEMS) technology. Miniature vacuum components and systems will open the possibility for significant savings in energy cost and will open the doors to advances in electronics, manufacturing and semiconductor fabrication. In conclusion, an understanding of the basic principles of vacuum technology as presented in this summary is essential for the successful execution of all projects that involve vacuum technology. Using the principles described above, a practitioner of vacuum technology can design a vacuum system that will achieve the project requirements.

  14. Job-Retention and Advancement Services for CalWORKs Participants: Initial Survey of County Practices - Detailed Research Findings

    E-Print Network [OSTI]

    Anderson, Jacquelyn; Miller, Jennifer; Bos, Johannes M.

    2002-01-01

    Luis Obispo, Stanislaus, Tulare, Tuolumne, Yolo Southern:Halle Pryor (831) 751-6002. Tulare County is in the process180 days. Traditionally, Tulare County contracts with local

  15. Science &Technology Facilities Council

    E-Print Network [OSTI]

    Science &Technology Facilities Council Science &Technology Facilities Council Science and Technology Facilities Council Annual Report and Accounts 2011-2012 Science and Technology Facilities Council Laboratory, Cheshire; UK Astronomy Technology Centre, Edinburgh; Chilbolton Observatory, Hampshire; Isaac

  16. SELECTING INFORMATION TECHNOLOGY SECURITY

    E-Print Network [OSTI]

    April 2004 SELECTING INFORMATION TECHNOLOGY SECURITY PRODUCTS Shirley Radack, Editor Computer Security Division Information Technology Laboratory National Institute of Standards and Technology Information technology security prod ucts are essential to better secure infor mation technology (IT) systems

  17. An Archaeological Survey for the Greenhouse Road Project in Western Harris County Texas 

    E-Print Network [OSTI]

    Moore, William; Baxter, Edward

    2015-07-28

    Brazos Valley Research Associates (BVRA) performed an archaeological survey along a one-mile segment of the Greenhouse Road lane addition in western Harris County, Texas for Harris County on October 3, 2007. William E. Moore was the Principal...

  18. EA-1801: Granite Reliable Power Wind Park Project in Coos County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01: Granite Reliable Power Wind Park Project in Coos County, NH EA-1801: Granite Reliable Power Wind Park Project in Coos County, NH June 25, 2010 EA-1801: Final Environmental...

  19. EA-1797: Agua Caliente Solar Project in Yuma County, AZ | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Agua Caliente Solar Project in Yuma County, AZ EA-1797: Agua Caliente Solar Project in Yuma County, AZ November 1, 2010 EA-1797: Final Environmental Assessment Loan Guarantee...

  20. Spatial Analysis of Residential Development and Urban-Rural Zoning in Baltimore County, Maryland 

    E-Print Network [OSTI]

    Griffin, Alexander C.

    2011-10-21

    Over the past half-century, Baltimore County, Maryland has experienced various policy measures that have shaped development patterns. This thesis analyzes three spatially explicit parcel-level models of residential development in Baltimore County...

  1. University of Maryland Baltimore County, Department of Geography and Environmental Systems

    E-Print Network [OSTI]

    Suri, Manil

    University of Maryland Baltimore County, Department of Geography and Environmental Systems Department Chair http://ges.umbc.edu Maryland, Baltimore 21250 Baltimore County (UMBC) invites applications and nominations for Department Chair

  2. INTEGRATED RIPARIAN AREA MANAGEMENT ON THE TULE LAKE ALLOTMENT, LASSEN COUNTY1

    E-Print Network [OSTI]

    INTEGRATED RIPARIAN AREA MANAGEMENT ON THE TULE LAKE ALLOTMENT, LASSEN COUNTY1 Bill Flournoy, Don; Davis, California. 2 Rancher, Likely, California; Farm Advisor, U.C. Cooperative Extension, Modoc County

  3. City of Aspen and Pitkin County- Renewable Energy Mitigation Program Grants

    Broader source: Energy.gov [DOE]

    With final approval coming from the Pitkin County Board of County Commissioners and the Aspen City Council, the Community Office for Resource Efficiency (CORE) periodically awards funding to wort...

  4. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  5. Whitfield County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia: EnergyMaryland:Meadow Lake, NewWhiteside County,County, Georgia:

  6. Yolo County, California: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEtGeorgia:Illinois:WizardYates County, New York: EnergyYoakum County,Yolo

  7. Wasco County, Oregon: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al.,Turin,VillageWarren Park, Indiana: EnergyWarrick County,Wasco County,

  8. Griggs County, North Dakota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar Jump to:ResourcesGriggs County, North Dakota: Energy

  9. Grimes County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,Solar Jump to:ResourcesGriggs County, North Dakota:

  10. Haakon County, South Dakota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERCInformation 3.1 - AmendmentsHaakon County, South

  11. Hall County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERCInformationVirginia: EnergyHall County, Georgia:

  12. Hall County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERCInformationVirginia: EnergyHall County,Texas:

  13. Hamilton County, Florida: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County,SolarFERCInformationVirginia:Hamblen County,NewFlorida:

  14. Fountain County, Indiana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainable Urban TransportFortistar LLC Jump to: navigation,County,Fountain County,

  15. Gem County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainable UrbanKentucky: EnergyGateway Edit HistoryGeary County,County, Idaho:

  16. Goliad County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia: Energy ResourcesIllinois: EnergyGolf,Goliad County,

  17. Goshen County, Wyoming: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia: EnergyGorlitz AG Jump to: navigation, searchCounty,

  18. Gove County, Kansas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia: EnergyGorlitz AG Jump to:Gotha,Gove County, Kansas:

  19. Gratiot County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia:Oregon: Energy ResourcesGratings Inc Jump to:County,

  20. Graves County, Kentucky: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia:Oregon: Energy ResourcesGratings IncGraves County,

  1. Grays Harbor County, Washington: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View New PagesSustainableGlynn County, Georgia:Oregon: Energy ResourcesGratingsGrays Harbor County,

  2. Sibley County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity for LowInformationShoshone County,Si BrilliantSibley County,

  3. Merrimack County, New Hampshire: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy Resources Jump1.2619821°,EnergyCounty, Nebraska:Merrimack County, New

  4. Mesa County, Colorado: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland: Energy Resources Jump1.2619821°,EnergyCounty,Merton, Wisconsin: EnergyCounty,

  5. Louisa County, Iowa: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona:Oregon: EnergyLloyd,Loudon County, Tennessee: EnergyLouisa County,

  6. Kay County, Oklahoma: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder atHills,New York:JustKandiyohiCounty,Kawar EnergyKay County,

  7. Kenosha County, Wisconsin: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder atHills,NewKeith County,Kenduskeag,Kenosha County, Wisconsin:

  8. Lemhi County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona: EnergyLebanon County,LefloreInformation East,Lemhi County,

  9. Lenoir County, North Carolina: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas:Montezuma, Arizona: EnergyLebanon County,LefloreInformationLenaweeLenoir County,

  10. Powder River County, Montana: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas:Pottawattamie County, Iowa:Pottstown,PoundPoway,County,

  11. Power County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPIProtectio1975) |Texas:Pottawattamie County,River, Wyoming:Wyoming:County,

  12. Oceana County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt. Louis,Energy Information AreaCountyEnergyOceana County,

  13. Ontonagon County, Michigan: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI VenturesNewSt.Information OlindaOnslow County, NorthOntonagon County,

  14. Longchuan County Yuming Development Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EAInvervarLeeds, UnitedLibertyLite OnCountyLongchuan County Yuming

  15. Longchuan County Yuming Industrial Development Co Ltd | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar2-0057-EAInvervarLeeds, UnitedLibertyLite OnCountyLongchuan County

  16. Banner County, Nebraska: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminex AAustriaBiofuelsOpen EnergyBanks County, Georgia:County,

  17. Bartow County, Georgia: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminexInformation Bartholomew County,Creek, Texas:Bartow County,

  18. Bastrop County, Texas: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EAandAmminexInformation Bartholomew County,Creek,Basile,Bastrop County,

  19. Camas County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank, Maine:Kansas:Information(Redirected fromCounty,County, Idaho: Energy

  20. Canyon County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,Cammack Village, Arkansas: EnergyCounty,New York: EnergyEnergyCounty,