Powered by Deep Web Technologies
Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Forrestal Security and Safety Procedures  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish uniform procedures for the security and safety of the Forrestal Building and to inform all personnel of precautionary measures. This directive does not cancel another directive. Canceled by DOE N 251.11.

1983-02-02T23:59:59.000Z

2

DEDICATION Loyd Henry Forrest Jr.  

E-Print Network [OSTI]

#12;DEDICATION Loyd Henry Forrest Jr. 1940­2006 The Interagency Bioenergy Working Group dedicates technology, and a successful and talented bioenergy consultant and entrepreneur. Over the course of his long;Prepared By: Navigant Consulting, Inc. One Market St, Spear Tower 1200 San Francisco, CA Richard Germain

3

Forrestal Garage Parking Procedures, Revised August 12, 2010  

Broader source: Energy.gov [DOE]

Forrestal Garage Parking Procedures - The Forrestal Facility Parking Guide was created to define policies and procedures governing the assignment, use, and management of parking spaces controlled...

4

forrestal  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF CIVILAMENDMENT20/%2A6/%2A6/%2A9/%2A

5

Forrest M. Hoffman Computational Earth Sciences Group  

E-Print Network [OSTI]

Forrest M. Hoffman Computational Earth Sciences Group Oak Ridge National Laboratory (ORNL) Oak Sciences Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee (November 1993­present). Scientific Sciences Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee (July 1992­ November 1993

Hoffman, Forrest M.

6

John L. Forrest, Jr. Patent Counsel of the Navy  

E-Print Network [OSTI]

Name John L. Forrest, Jr. Patent Counsel of the Navy Deputy Counsel, Office of Naval Research Office of Naval Research John L. Forrest, Jr., the Patent Counsel of the Navy, is the chief Intellectual. Additional responsibilities include managing the Navy trademark program, the DON patent licensing program

7

Forrest M. Ho#man Computational Earth Sciences Group  

E-Print Network [OSTI]

Forrest M. Ho#man Computational Earth Sciences Group Oak Ridge National Laboratory (ORNL) Oak Ridge Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee (November 1993--present). Scientific Sciences Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee (July 1992-- November 1993

Hoffman, Forrest M.

8

Forrest M. Ho#man Computational Earth Sciences Group  

E-Print Network [OSTI]

Forrest M. Ho#man Computational Earth Sciences Group Oak Ridge National Laboratory (ORNL) Oak Ridge Oak Ridge National Laboratory (ORNL)/UT­Battelle, LLC, MS 6016, Oak Ridge, Tennessee 37831-- 6016 of Oak Ridge National Laboratory's Environmental Sciences Division. Developed and modified scientific

Hoffman, Forrest M.

9

Forrest Conservation Area : Management & Implementation FY 2004 Annual Report.  

SciTech Connect (OSTI)

The Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Conservation Area during July of 2002. The property is located in the Upper John Day subbasin within the Columbia basin. The property consists of two parcels comprising 4,232 acres. The Mainstem parcel consists of 3,445 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem John Day River. The Middle Fork parcel consists of 786 acres and is located one mile to the west of the town of Austin, OR on the Middle Fork John Day River. The Forrest Conservation Area is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. Acquisition of the Forrest Conservation Area was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by hydroelectric facilities on the Columbia River and its tributaries. The intent of the Conservation Area is to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, {section}11.1, {section}7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of management funding for the protection and restoration of fish and wildlife habitat through a memorandum of agreement.

Smith, Brent

2008-12-01T23:59:59.000Z

10

Forrest Ranch Acquisition, Annual Report 2001-2002.  

SciTech Connect (OSTI)

Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The contract period was the first year of the program with December 2001 through July 2nd 2002 being previous to acquisition of the property. The majority of the activities conducted under the contract period were spent on O&M and pre acquisition activities.

Smith, Brent

2003-08-01T23:59:59.000Z

11

Forrest Ranch Management and Implementation, Annual Report 2002-2003.  

SciTech Connect (OSTI)

Through their John Day Basin Office, the Confederated Tribes of Warm Springs Reservation of Oregon (Tribes) acquired the Forrest Ranch during July of 2002. The property consists of two parcels located in the John Day subbasin within the Columbia basin. The mainstem parcel consists of 3,503 acres and is located 1/2 mile to the east of Prairie City, Oregon on the mainstem of the John Day River. The middle fork parcel consists of 820 acres and is located one mile to the west of the town of Austin, OR on the middle fork John Day River. The Forrest Ranch Project is under a memorandum of agreement with the Bonneville Power Administration (BPA) to provide an annual written report generally describing the real property interests of the project and management activities undertaken or in progress. The Forrest Ranch acquisition was funded by BPA as part of their program to protect, mitigate, and enhance fish and wildlife habitat affected by the operation of their hydroelectric facilities on the Columbia River and its tributaries. Following lengthy negotiations with the BPA and property owner, the Tribes were able to conclude the acquisition of the Forrest Ranch in July of 2002. The intent of the acquisition project was to partially mitigate fish and wildlife impacts for the John Day Dam on the Columbia River as outlined in the Northwest Power Planning Council's Wildlife Program (NPPC 1994, section 11.1, section 7.6). While the Tribes hold fee-title to the property, the BPA has assured a level of program funding through a memorandum of agreement and annual statement of work. As early as 1997, the Tribes identified this property as a priority for restoration in the John Day basin. In 2000, the Tribes arranged an agreement with the landowner to seek funds for the acquisition of both the Middle Fork and upper Mainstem John Day River holdings of Mr. John Forrest. This property had been a priority of not only the Tribes, but of many other basin natural resource agencies. The contract period was the first year of the program with December 2001 through July 2nd 2002 being previous to acquisition of the property. The majority of the activities conducted under the contract period were spent on O&M and pre acquisition activities.

Smith, Brent

2004-01-01T23:59:59.000Z

12

Forrestal Garage Parking Procedures, Revised February 1, 2015 | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S.Financialof Energy Forrestal Garage Parking

13

The USDOE Forrestal Building Lighting Retrofit: Preliminary Analysis of Electricity Savings  

E-Print Network [OSTI]

In September of 1993 a 36,832 fixture lighting retrofit was completed at the United States Department of Energy Forrestal complex in Washington, D.C. This retrofit represents DOE's largest project to date that utilizes a Shared Energy Savings (SES...

Haberl, J. S.; Bou-Saada, T. E.; Vajda, E. J.; Shincovich, M.; D'Angelo III, L.; Harris, L.

1994-01-01T23:59:59.000Z

14

Deployment of Internet Technologies at Oak Ridge National Laboratory Forrest Hoffman  

E-Print Network [OSTI]

Deployment of Internet Technologies at Oak Ridge National Laboratory Forrest Hoffman Environmental Sciences Division Oak Ridge National Laboratory* P.O. Box 2008 Oak Ridge, Tennessee 37831--6036 ABSTRACT applications for this forum. Oak Ridge National Laboratory­s entire General Employee Training guide, including

Hoffman, Forrest M.

15

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Andrew Roach, Chris Forrest, Jedaiah van Dijk, Jess Herman, Ricky Sangha, Svyatoslav Korshunov  

E-Print Network [OSTI]

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Andrew Roach, Chris #3 Andrew Roach Chris Forrest ( Jedaiah van Dijk ( Jess Herman ( Ricky Sangha ( Svyatoslav Korshunov

16

A TEAM PERFORMANCE DATA COLLECTION AND ANALYSIS SYSTEM Stephanie Guerlain, Thomas Shin, Hui Guo, Reid Adams and J. Forrest Calland  

E-Print Network [OSTI]

an anesthesia simulator, with the role of the surgeon played by whatever surrogate individual is available Anesthesia Attending (AA) Directs AR Anesthesia Resident (AR) Performs anesthesia duties Scrub Nurse (SN

Virginia, University of

17

[TR] The legacies of World War II, (a roundtable discussion with H. Brooks, J. W. Forrester, P. Morrison, A. Roland, S. van Evera, E. C. Weaver, H. Woolf),  

E-Print Network [OSTI]

[TR] The legacies of World War II, (a roundtable discussion with H. Brooks, J. W. Forrester, P. Florida and M. Kenney, ``The Breakthrough Illusion: Corporate America's Failure to Move from Innovation

Odlyzko, Andrew M.

18

A Forrester Consulting Thought Leadership Paper Commissioned By Microsoft And RSA, The Security Division Of EMC The Value Of Corporate Secrets  

E-Print Network [OSTI]

Division Of EMC The Value Of Corporate Secrets How Compliance And Collaboration Affect Enterprise, the security division of EMC, commissioned Forrester Consulting to assess the data security practices of North

Narasayya, Vivek

19

Finding Forrester (2000) The film opens with 16-year-old Jamal Wallace (Rob Brown) sleeping in his bedroom, which is  

E-Print Network [OSTI]

Finding Forrester (2000) The film opens with 16-year-old Jamal Wallace (Rob Brown) sleeping in his Jamal and his friends play basketball. They regularly notice him watching them from his window, although they never see his face, and they refer to him simply as 'The Window'. One day after school, one of the boys

Schenato, Luca

20

The Engineering Team Todd Allen (Team Leader)  

E-Print Network [OSTI]

The Engineering Team Todd Allen (Team Leader) tallen@fit.edu Major: Ocean Engineering Speciality: Naval Architecture Sean Kuhn skuhn@fit.edu Major: Ocean Engineering Speciality: Naval Architecture Joseph Caldwell jcaldwel@fit.edu Major: Ocean Engineering Speciality: Underwater Technologies Seth Noyes

Wood, Stephen L.

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Ocean Engineering Development Team  

E-Print Network [OSTI]

Ocean Engineering Hydrofoil Development Team Justin Eickmeier Mirela Dalanaj Jason Gray Matt test bed for future hydrofoil designs. 5) To create future student interest in the Ocean Engineering Efficiency and Acceleration. #12;Design Team Justin Eickmeier Team Leader Major: Ocean Engineering, Junior

Wood, Stephen L.

22

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

23

Grid Interaction Tech Team  

Broader source: Energy.gov (indexed) [DOE]

Team 2011 DOE Hydrogen Program and Vehicle Technologies Annual Merit Review May 10, 2011 Keith Hardy (PI) Argonne National Laboratory Sponsored by Lee Slezak This presentation does...

24

IDConsultants Team(Blueand  

E-Print Network [OSTI]

IDConsultants Pla-orm Groups Func4onal Groups Team(Blueand Gold) Chassis DriveTrain Control Actua4on Mechanisms Pla-ormA Pla-ormB Pla-ormC Pla-ormD TEAM #12;1. EveryengineeringstudentispartofaFunc4onalGroupANDaPla-ormGroup. 2. StudentsareassignedtoFunc4onalGroupsbyinstructorsandtoPla

Batill, Stephen M.

25

Nuclear Emergency Search Team  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) policy for Nuclear Emergency Search Team (NEST) operations to malevolent radiological incidents. This directive does not cancel another directive. Canceled by DOE O 153.1.

1991-09-20T23:59:59.000Z

26

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

27

TEAM Technologies, Inc.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

as a one-man operation in support of Sandia's Z Machine, a mainstay of the Lab's Pulsed Power program. No longer a one-man shop, TEAM employs more than 70 people and operates...

28

Team work: Construction  

E-Print Network [OSTI]

Team work: Construction Management The Division of Engineering Technology in an construction technology area, an associate degree in construction science, or college- level course work equivalent to an associate degree in construction related area

Berdichevsky, Victor

29

US Geological Survey, Geospatial Information Response Team Team Charter  

E-Print Network [OSTI]

US Geological Survey, Geospatial Information Response Team Team Charter Revised December 15, 2010 This charter outlines the purpose, responsibility and structure of the U.S. Geological Survey Geospatial Information Response Team (GIRT). Purpose--The primary purpose of the Geospatial Information Response Team

Torgersen, Christian

30

An I-P-O model of team goal, leader goal orientation, team cohesiveness, and team effectiveness  

E-Print Network [OSTI]

Based on a proposed input-process-output model of team goal, leader goal orientation, team cohesion, and team effectiveness, this study examined the influences of the leader trait goal orientation on the relationships between team goals and team...

Yu, Chien-Feng

2006-04-12T23:59:59.000Z

31

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

32

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

33

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

34

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

35

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

36

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

37

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

38

PI & Project Team PAF Changes  

E-Print Network [OSTI]

Proposal Management PI & Project Team PAF Changes Step-By-Step Procedures Last updated: 4/1/2013 1 of 10 http://eresearch.umich.edu PAF Changes This procedure details how the PI & Project Team can: Make Management PI & Project Team PAF Changes Step-By-Step Procedure Last updated: 4/1/2013 3 of 10 http

Shyy, Wei

39

1. Introduction Assign team leaders  

E-Print Network [OSTI]

/call/freq Indirect fire/call/freq Air support/call/freq Confirm dis/azimuth Notional security AA location PIR ROE1. Introduction Assign team leaders Assign map man and time keeper Security SOP specialty teams schedules j. PIR k.ROE l. Signals to initiate attack m. Specialty teams n.Contingency plans...indirect fire

de Lijser, Peter

40

Information Visualization for Agile Software Development Teams  

E-Print Network [OSTI]

Information Visualization for Agile Software Development Teams Julia Paredes Department of Computer software development teams. The results of the systematic mapping show that Agile teams use visualization artifacts amongst team members. Keywords--Agile software development, information visualiza- tion, software

Maurer, Frank

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Team Total Points Beta Theta Pi 2271  

E-Print Network [OSTI]

Bubbles 40 Upset City 30 Team Success 30 #12;Team Total Points Sly Tye 16 Barringer 15 Fire Stinespring 15

Buehrer, R. Michael

42

TEAM Technologies, Inc.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAbout »LabSustainabilitySynthetic fuelTPension PlanTEAM

43

Clean Energy Resource Teams (Minnesota)  

Broader source: Energy.gov [DOE]

Clean Energy Resource Teams (CERTs) are community-based groups stemming from a state, university, and nonprofit partnership to encourage community energy planning and clean energy project...

44

2015 High School Team Photos  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High-School-Team-Photos- Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

45

2015 Middle School Team Photos  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Middle-School-Team-Photos Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

46

2008 TEAM BUILDING DAY For the teams of the  

E-Print Network [OSTI]

2008 TEAM BUILDING DAY For the teams of the DST/NRF CENTRE OF EXCELLENCE IN TREE HEALTH BIOTECHNOLOGY (CTHB) AND THE TREE PROTECTION COOPERATIVE PROGRAMME (TPCP) AT FABI Prepared by James Mehl, administrative and technical personnel, research and postdoctoral fellows, and postgraduate students (MSc and Ph

47

Setting the stage for effective teams: a meta-analysis of team design variables and team effectiveness  

E-Print Network [OSTI]

and is inconsistent, and conclusions regarding optimal team design are difficult to make. The present study sought to unify the team design research by proposing a conceptual model and testing hypothesized relationships between specified design variables and team...

Bell, Suzanne Tamara

2004-11-15T23:59:59.000Z

48

The influence of team mental models and team planning on team performance  

E-Print Network [OSTI]

approaches on post-planning MM similarity. Third, I examined the influence of post-planning teamwork and taskwork MM similarity on team performance. I tested these relationships with 172 three-person ad hoc teams performing a problem-solving execution task...

Leiva Neuenschwander, Pedro Ignacio

2009-06-02T23:59:59.000Z

49

Fuzzy Teams: Why do teams disagree on their membership, and what does it mean?  

E-Print Network [OSTI]

Organizations increasingly rely on teams as fundamental building blocks - a focus mirrored by a long legacy of research on teams. Due to the complexity of team dynamics and processes within teams

Mortensen, Mark

2008-02-01T23:59:59.000Z

50

Determining Team Hierarchy from Broadcast Communications  

E-Print Network [OSTI]

on the Enron corpus of corporate email. 1 Introduction In an organization, a team is a purposeful social system team members. Eaton [4] provides insight that communication is essential for team members to build

51

Understanding the Team Dynamics of an Executive Virtual Team  

E-Print Network [OSTI]

multinational executive virtual team best works. The findings of this study reveal that there are many ways to communicate utilizing technology, but the objective for this virtual team is to be multidimensional in use. That means that honest communication... Within This Study ????????????? 77 4 Advantages and Disadvantages of Working Virtually Associated With Technology??????????????????????... 133 1 CHAPTER I INTRODUCTION Organizations of all types are now able to operate in virtual...

Riley, Ramona Leonard

2011-10-21T23:59:59.000Z

52

Manufacturing Tech Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Manufacturing Tech Team Manufacturing Tech Team Clean Energy Manufacturing Initiative Industrial Efficiency and Energy Productivity Video Industrial efficiency and low-cost energy...

53

Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy  

E-Print Network [OSTI]

Forrestal Building Summary: Full Proposal 05/02/91 Neat Supplies E.tffo $3,000 Wire $400/1000 4 pr, $150/1000 2 pr $1,000 Misc. Electrical Supplies Neat G&A on Supplies & Materials: $3,408 | Neat Subcontract labor_Estimates: $10,000 Electrician Hot Tap...,000 Electrician Hot Tap Contractor Steam Meter Installer Plumber Neat G&A on Subcontracts: $800 Texas A&M Lqhor $10,000 Supplemental Living Allowance $8,000 Travel to & from job Neat G&A Travel: $4,500 Neat Labor $5,000 Management $3,000 Programming & Engineeering...

Claridge, D. E.; Haberl, J. S.; Bryant, J.; Poyner, B.; McBride, J.

1991-01-01T23:59:59.000Z

54

Extreme Work Teams: Using SWAT Teams As a Model for Coordinating Distributed Robots  

E-Print Network [OSTI]

Extreme Work Teams: Using SWAT Teams As a Model for Coordinating Distributed Robots Hank Jones phinds@leland.stanford.edu ABSTRACT We present a field study of police SWAT teams for the purpose observations. Keywords Distributed work, distributed teams, leadership, extreme work teams, field robotics

55

Joseph M. Juran Team Members  

E-Print Network [OSTI]

Joseph M. Juran I E 361 Fall 2002 Team Members: Dragui Nestorovic Gonzalo Rodriguez Monica Kroh Jaroslav Sebek #12;Introduction Joseph M. Juran has led a life of success and accomplishments. Using his. Background Joseph M. Juran was born in Brailia, Romania, during December of 1904. When Joseph was five years

Vardeman, Stephen B.

56

Education Strategy Team Policy Division  

E-Print Network [OSTI]

Education Strategy Team Policy Division DFID 1 Palace Street London SW1E 5HE 30 October 2009 TEL fellowships in India under the Wellcome Trust/DBT India Alliance2 . We believe that such investment is vital/Global-health-research/WTX055734.htm 2 Wellcome Trust/DBT India Alliance: http://www.wellcomedbt.org/index.htm #12;to support

Rambaut, Andrew

57

The Relationship Between Team Sex Composition and Team Performance in the Context of Training Complex, Psychomotor, Teambased Tasks  

E-Print Network [OSTI]

The objective of this study was to investigate the role of team sex composition in team training performance and team processes in the context of a complex, psychomotor, informationprocessing task. With the growing number of women in the workplace...

Jarrett, Steven

2011-02-22T23:59:59.000Z

58

Learning strategies and performance in organizational teams  

E-Print Network [OSTI]

(cont.) shows that vicarious learning is positively associated with performance. I argue that vicarious team learning is an under-explored dimension of what makes teams and organizations competitive. The chapter concludes ...

Bresman, Henrik M

2005-01-01T23:59:59.000Z

59

Team Bug Bag Biogas For Nicaragua  

E-Print Network [OSTI]

Team Bug Bag Biogas For Nicaragua Project Recap The task for Team Bug Bag was to create for under $100 (USD), and be able to produce biogas that could boil water for a thirty minute time period

Demirel, Melik C.

60

US DRIVE Materials Technical Team Roadmap | Department of Energy  

Energy Savers [EERE]

Materials Technical Team Roadmap US DRIVE Materials Technical Team Roadmap The Materials Technical Team (MTT) focuses primarily on reducing the mass of structural systems such as...

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Vehicle Technologies Office: US DRIVE Materials Technical Team...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

US DRIVE Materials Technical Team Roadmap Vehicle Technologies Office: US DRIVE Materials Technical Team Roadmap The Materials Technical Team (MTT) of the U.S. DRIVE Partnership...

62

Hydrogen Production Technical Team Roadmap  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject:GroundtoProduction Technical Team Roadmap June 2013 This

63

National Construction Safety Team Act Annual Report  

E-Print Network [OSTI]

National Construction Safety Team Act Annual Report Fiscal Year 2007 Introduction In October 2002, the President signed into law the National Construction Safety Team (NCST) Act (P.L. 107 National Construction Safety Teams for deployment after events causing the failure of a building

Magee, Joseph W.

64

Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAboutManus Site-InactiveLaboratory TeVTeacher

65

Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAboutManus Site-InactiveLaboratory

66

Universitt Mannheim Paulheim, Bizer: Team Project Introduction FSS2013 Slide 1 Team Project  

E-Print Network [OSTI]

Universität Mannheim ­ Paulheim, Bizer: Team Project Introduction ­ FSS2013 ­ Slide 1 Team Project;Universität Mannheim ­ Paulheim, Bizer: Team Project Introduction ­ FSS2013 ­ Slide 2 Ingredients A hot topic;Universität Mannheim ­ Paulheim, Bizer: Team Project Introduction ­ FSS2013 ­ Slide 3 Ingredient 1: A Hot

Mannheim, Universität

67

Forrest County Geothermal Energy Project  

Broader source: Energy.gov [DOE]

Project objectives: Retrofit two county facilities with high efficiency geothermal equipment (The two projects combined comprise over 200,000 square feet). Design and Construct a demonstration Facility where the public can see the technology and associated savings. Work with established partnerships to further spread the application of geothermal energy in the region.

68

Forrest Jehlik | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityFieldMinds" Give Forms (All forms are

69

forrestal | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational NuclearhasAdministration goSecuritycdns ||

70

The I in Team: Coach Incivility, Coach Sex, and Team Performance in Female Basketball Teams  

E-Print Network [OSTI]

that experiences of incivility incited feelings of rejection and ostracism for targets. Taken together, these findings highlight the particularly negative effects of incivility on individual attitudes and well-being. Research extending these effects to team... of the incivility-commitment relationship. Tepper (2000) found that targets who experienced abusive supervision had lower affective and normative commitment towards their organization. Similarly, at the individual level, incivility has been shown to negatively...

Smittick, Amber Leola

2012-10-19T23:59:59.000Z

71

Team | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security AdministrationcontrollerNanocrystallineForeign ObjectOUR8, 2013Battelle: How to start a projectTeam

72

Intelligence team given national honor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformation for and NovelFEG-SEM with0, FirstIntelligence team given

73

Team Summary | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartmentChallengeCompliance7/109THETTU UTeam Summary Team

74

Sandia National Laboratories: Our Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErik Spoerke SSLSMolten-Salt StorageNoLong Range RadarFacilityOpticsEFRCOur Team

75

Advanced Vehicle Technology Analysis & Evaluation Team  

Broader source: Energy.gov [DOE]

Presentation on Advanced Vehicle Technology Analysis & Evaluation Team to the DOE Systems Analysis Workshop held in Washington, D.C. July 28-29, 2004.

76

Solar Decathlon 2013: New Teams! New Location!  

Broader source: Energy.gov [DOE]

In addition to welcoming 20 new collegiate teams and hundreds of new student decathletes to our 2013 competition, we are announcing a new site.

77

Nuclear / Radiological Advisory Team | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

as needed. The NRAT is composed of scientists and technicians who can provide advice or conduct limited operations. NRAT Team performing analysis Mission The NRAT's mission is to...

78

Nuclear Incident Team | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Incident Team | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear...

79

Free agents are not guaranteed a position on a team. Every effort will be made to place you on a team or create a team comprised of other  

E-Print Network [OSTI]

FREE AGENT Free agents are not guaranteed a position on a team. Every effort will be made to place you on a team or create a team comprised of other free agents. Please fill out this form COMPLETELY

Mitchison, Tim

80

2013MIT SOLAR ELECTRIC VEHICLE TEAM The MIT Solar Electric Vehicle Team (SEVT)  

E-Print Network [OSTI]

Challenge in Australia, and the North American Solar Challenge. The vehicles drive during the day and stop2013MIT SOLAR ELECTRIC VEHICLE TEAM #12;The MIT Solar Electric Vehicle Team (SEVT) is a student organization dedicated to demonstrating the viability of alternative energy-based transportation. The team

Williams, Brian C.

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

MMS establishes team to resolve royalty disputes  

SciTech Connect (OSTI)

This paper reports that the U.S. Minerals Management Service has set up a permanent negotiating team to resolve royalty disputes with producers. MMS plans to use the team approach to negotiate multiple settlements in single, marathon negotiations covering issues such as production monitoring, production valuation, royalty reporting, and royalty payments.

Not Available

1992-06-22T23:59:59.000Z

82

Contract Team Update Presented by Connie Motoki  

E-Print Network [OSTI]

Contract Team Update Presented by Connie Motoki January 15, 2008 #12;STC Form #12;#12;· Summary of Terms & Conditions · A Contract Manager initiates the STC. · STC is required for: New incoming subagreements & contracts Amendments to the existing agreement · Grants Team profiler cannot add money or date

Kroll, Kristen L.

83

August 1993 INTEGRATED HATCHERY OPERATIONS TEAM  

E-Print Network [OSTI]

August 1993 INTEGRATED HATCHERY OPERATIONS TEAM OPERATION PLANS FOR ANADROMOUS FISH PRODUCTION.S. Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected as follows: Shelldrake, Tom, U.S. Fish and Wildlife Service Hatcheries, Integrated Hatchery Operations Team

84

Solar Technical Assistance Team (Fact Sheet)  

SciTech Connect (OSTI)

The Solar Technical Assistance Team (STAT) is a team of solar technology and deployment experts who ensure that the best information on policies, regulations, financing, and other issues is getting into the hands of state government decision makers whey they need it. This fact sheet provides information about STAT and the STAT webinar series for the summer of 2012.

Not Available

2012-07-01T23:59:59.000Z

85

National Construction Safety Teams Annual Report  

E-Print Network [OSTI]

National Construction Safety Teams Annual Report Fiscal Year 2006 Introduction In October 2002, the President signed into law the National Construction Safety Team (NCST) Act (P.L. 107-231), which authorized the Director of the National Institute of Standards and Technology (NIST) to establish National Construction

Magee, Joseph W.

86

National Construction Safety Team Act Annual Report  

E-Print Network [OSTI]

National Construction Safety Team Act Annual Report Fiscal Year 2008 Summary This annual report to Congress for FY 2008 is required by the National Construction Safety Team Act. NIST completed its federal report. The ICC Codes are widely adopted and used as the basis for state and local construction codes

Magee, Joseph W.

87

Palouse Team PhD Assistantship Announcements  

E-Print Network [OSTI]

Palouse Team PhD Assistantship Announcements Interdisciplinary PhD Research Assistantships in Conservation Biology, Sustainable Production and Social-Ecological Resilience of the Palouse Prairie Ecosystem team working on aspects of conservation of the endangered Palouse Prairie ecosystem in the context

Waits, Lisette

88

Solar Technical Assistance Team (STAT) (Fact Sheet)  

SciTech Connect (OSTI)

The Solar Technical Assistance Team (STAT) is a team of solar technology and deployment experts who ensure that the best information on policies, regulations, financing, and other issues is getting into the hands of state government decision makers when they need it.

Not Available

2014-05-01T23:59:59.000Z

89

The Environment Team to Waste & Recycling  

E-Print Network [OSTI]

The Environment Team A-Z Guide to Waste & Recycling www.le.ac.uk/environment #12;Welcome ...to the University of Leicester's `A-Z Guide to Waste and Recycling'. Over the last 3 years, the Environment Team has introduced an award- winning recycling scheme across the campus that allows us to recycle paper, plastics

St Andrews, University of

90

eRA Training Team1 Terminations  

E-Print Network [OSTI]

eRA Training Team1 xTrain Terminations Electronic Research Administration Sponsored by: The National Institutes of Health, Office of Extramural Research March 2012 #12;eRA Training Team2 xTrain General Information xTrain Overview The following section provides general information on the xTrain

Baker, Chris I.

91

eRA Training Team1 Terminations  

E-Print Network [OSTI]

eRA Training Team1 xTrain Terminations Electronic Research Administration Sponsored by: The National Institutions of Health, Office of Extramural Research April 2010 #12;eRA Training Team2 xTrain General Information xTrain Overview The following section provides general information on the xTrain

Baker, Chris I.

92

Worker Safety and Security Teams Team Member Handbook  

SciTech Connect (OSTI)

Worker Safety and Security Teams (WSSTs) are an effective way to promote safe workplaces. While WSSTs have a variety of structures and roles, they have one thing in common - employees and management collaborate to find ways to prevent accidents, injuries, and illnesses on the job. The benefits for all concerned are obvious in that employees have a safe place to work, employers save money on lost work time and workers compensation costs, and everyone returns home safe and healthy each day. A successful WSST will have the support and wholehearted participation of management and employees. LANL has a WSST at the institutional level (IWSST) and at all directorates and many divisions. The WSSTs are part of LANL's Voluntary Protection Program (VPP). The WSSTs meet at least monthly and follow an agenda covering topics such as safety shares, behavior based safety (BBS) observations, upcoming events or activities, issues, etc. A WSST can effectively influence safety programs and provide recommendations to managers, who have the resources and authority to implement changes in the workplace. WSSTs are effective because they combine the knowledge, expertise, perspective, enthusiasm, and effort of a variety of employees with diverse backgrounds. Those with experience in a specific job or work area know what the hazards or potential hazards are, and generally have ideas how to go about controlling them. Those who are less familiar with a job or area play a vital role too, by seeing what others may have overlooked or taken for granted. This booklet will cover the structure and operations of WSSTs, what needs to be done in order to be effective and successful, and how you can help, whether you're a WSST member or not.

Sievers, Cindy S. [Los Alamos National Laboratory

2012-06-11T23:59:59.000Z

93

Performance assessment task team progress report  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Headquarters EM-35, established a Performance Assessment Task Team (referred to as the Team) to integrate the activities of the sites that are preparing performance assessments (PAs) for disposal of new low-level waste, as required by Chapter III of DOE Order 5820.2A, {open_quotes}Low-Level Waste Management{close_quotes}. The intent of the Team is to achieve a degree of consistency among these PAs as the analyses proceed at the disposal sites. The Team`s purpose is to recommend policy and guidance to the DOE on issues that impact the PAs, including release scenarios and parameters, so that the approaches are as consistent as possible across the DOE complex. The Team has identified issues requiring attention and developed discussion papers for those issues. Some issues have been completed, and the recommendations are provided in this document. Other issues are still being discussed, and the status summaries are provided in this document. A major initiative was to establish a subteam to develop a set of test scenarios and parameters for benchmarking codes in use at the various sites. The activities of the Team are reported here through December 1993.

Wood, D.E.; Curl, R.U.; Armstrong, D.R.; Cook, J.R.; Dolenc, M.R.; Kocher, D.C.; Owens, K.W.; Regnier, E.P.; Roles, G.W.; Seitz, R.R. [and others

1994-05-01T23:59:59.000Z

94

Shedding Light on the Solar Decathlon 2013 Teams | Department...  

Broader source: Energy.gov (indexed) [DOE]

Shedding Light on the Solar Decathlon 2013 Teams Shedding Light on the Solar Decathlon 2013 Teams August 29, 2012 - 10:13am Addthis Meet the teams competing in the Solar Decathlon...

95

National Science Bowl Update: Middle School Teams from Maryland...  

Broader source: Energy.gov (indexed) [DOE]

Science Bowl Update: Middle School Teams from Maryland and Indiana to Compete for National Championship on Monday National Science Bowl Update: Middle School Teams from Maryland...

96

Delegation of Approval Authority for Integrated Project Team...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Team Charter Documents for Office of Environmental Management Major System Projects by surash DelegationApprovalAuthorityIntegratedProjectTeamCharterDocuments-EMMajorSysProject-Sur...

97

NERSC Science Gateways Open New Pathways to 'Team Science'  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC's Science Gateways Pave Way for 'Team Science' NERSC Gateways Pave Way for 'Team Science' Computational scientists at NERSC work with researchers around the globe to develop...

98

Nine teams compete in Virginia Middle School Science Bowl competition...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nine teams compete in Virginia Middle School Science Bowl competition at Jefferson Lab on March 11 March 17, 2006 Peasley Middle School The Peasley Middle School Team from...

99

2014 Race to Zero Student Design Competition: Grand Winner Teams...  

Office of Environmental Management (EM)

2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition:...

100

Teaming Partner List Available for the Innovative Composites...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Teaming Partner List Available for the Innovative Composites Institute FOA Teaming Partner List Available for the Innovative Composites Institute FOA March 26, 2014 - 12:34pm...

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Joint Technical Operations Team | National Nuclear Security Administra...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Blog Home About Us Our Programs Emergency Response Responding to Emergencies Render Safe Joint Technical Operations Team Joint Technical Operations Team JTOT Logo...

102

Grid Interaction Tech Team, and International Smart Grid Collaboration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Team, and International Smart Grid Collaboration Grid Interaction Tech Team, and International Smart Grid Collaboration 2012 DOE Hydrogen and Fuel Cells Program and Vehicle...

103

Small Business Teaming Workshop Program | National Nuclear Security...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home Small Business Teaming Workshop Program Small Business Teaming Workshop Program To increase small...

104

US DRIVE Vehicle Systems and Analysis Technical Team Roadmap...  

Energy Savers [EERE]

Vehicle Systems and Analysis Technical Team Roadmap US DRIVE Vehicle Systems and Analysis Technical Team Roadmap VSATT provides the analytic support and subsystem characterizations...

105

Our Teams | Argonne Leadership Computing Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About Overview History Staff Directory Our Teams User Advisory Council Careers Margaret Butler Fellowship Visiting Us Contact Us Need Help? support@alcf.anl.gov 630-252-3111...

106

Integrated Initiative Teams and Working Groups  

E-Print Network [OSTI]

Initiative Team Mark McFarland, chair Juan Anciso Todd Bilby Diane Boellstorff Gary Bryant Anthony Camerino Todd Bilby Diane Boellstorff Elizabeth Brown John Carey Alex Castillo Rudy Dunlap Gary Ellis Morgan

107

Nuclear Nonproliferation Ontology Assessment Team Final Report  

SciTech Connect (OSTI)

Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

Strasburg, Jana D.; Hohimer, Ryan E.

2012-01-01T23:59:59.000Z

108

Program Development Plan and Team up  

SciTech Connect (OSTI)

The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

Solar Electric Power Association

2001-12-01T23:59:59.000Z

109

2013 Team UniSA-Australia World class thinking.  

E-Print Network [OSTI]

2013 Team UniSA-Australia guide World class thinking. World class talent. #12;Intoduction A message from Patrick Jonker, Team UniSA-Australia Ambassador Rider Profiles > Bernard Sulzberger > Adam Phelan and contacts 3 4 5 6 7 8 9 10 11 12 Team UniSA-Australia contents #12;3 Team UniSA-Australia A modern, vibrant

Li, Jiuyong "John"

110

Communications and Outreach K. L. Bethea1 Team Lead/  

E-Print Network [OSTI]

. Ren Team Leader K. Danilova Software Engineer D. Purcell Software Engineer J. Patton DB Engineer B

111

Presented by Y.Shimomura ITER Joint Central Team and Home Teams  

E-Print Network [OSTI]

of reliability of the operation Full commissioning of the ITER systemin a non-nuclear environment DevelopmentPresented by Y.Shimomura ITER Joint Central Team and Home Teams Oct. 5, 2000 Sorrento, Italy #12 Elevation Layout #12;Phased Operations Hydrogen Phase Confirmation of the machine performance and increase

112

Team Massachusetts Brings a Fourth Dimension to the Solar Decathlon  

Broader source: Energy.gov [DOE]

Team Massachusetts is bringing a unique perspective to the Solar Decathlon this fall. You might say it is a fourth dimension because of the teams newly constructed 4D Home. But it could also be argued that it is because the Massachusetts College of Art and Design and University of Massachusetts Lowell are collaborating for the teams first entry into the biannual competition, and theyre both public institutions.

113

Team B: The trillion dollar experiment  

SciTech Connect (OSTI)

Team B was an experiment in competetive threat assessments approved by the director of the CIA at that time, George Bush. Teams of experts were to make independent assessments of highly classified data used by the intelligence community to assess Soviet strategic forces in the yearly National Intelligence Estimates. In this article, two experts report on how a group of Cold War outside experts were invited to second-guess the policies of the CIA. The question explored here is whether or not these outside experts of the 1970s contributed to the military buildup of the 1980s.

Cahn, A.H.; Prados, J.

1993-04-01T23:59:59.000Z

114

The effects of team diversity on a team process and team performance in the National Hockey League  

E-Print Network [OSTI]

and managers, while also contributing to the theoretical body of literature for sport and diversity research. This research examined National Hockey League teams and players during a three year period (2001-2004). English Canadians made up 42.5% of the players...

Waltemyer, David Scott

2009-05-15T23:59:59.000Z

115

Energy Monitoring of Software project-team  

E-Print Network [OSTI]

Energy Monitoring of Software Systems project-team Romain Rouvoy Aurélien Bourdon Adel Noureddine Lionel Seinturier firstname.lastname@inria.fr #12;ICT & Energy 2% of the global energy consumption in 2007 [1] [1] Gartner #12;ICT & Energy [1] 2008 ICT report, Ecology Ministry 13.5% of the electricity

Lefèvre, Laurent

116

NAME/TEAM: ______________________________________ GCMS postlab -1  

E-Print Network [OSTI]

NAME/TEAM: ______________________________________ GCMS postlab - 1 GC/MS of Gasoline Postlab Last (%) (w/w) % Ethanol Benzene ________ Convert your v/v % ethanol in gasoline to units of mass % (w/w %) of oxygen in gasoline. (Density of ethanol = 0.789 g/mL, Density of gasoline = 0.66 g/mL). Use dimensional

Nizkorodov, Sergey

117

Team Kentucky Awards: 2013 INTEL Grand Awards  

E-Print Network [OSTI]

Team Kentucky Awards: 2013 INTEL Grand Awards Second Award of $1,500: Energy and Transportation, Lexington, Kentucky Second Award of $1,500: Environmental Sciences An Inquiry into the Effect High School, Louisville, Kentucky Third Award of $1,000: Engineering: Materials and Bioengineering

Cooper, Robin L.

118

TEAMS: Indoor Air Quality (IAR) Program  

E-Print Network [OSTI]

in place since April of 2002. Recognizing the need to expand the program in depth and breadth, we designed TEAMS. We were able to do this by assistance from Mike Miller and the EPA, who gave the District six Tools for Schools test kits (TfS Kit...

Melton, V.

119

2012 Director's Science Delivery Award | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SHARE 2012 Director's Science Delivery Award June 24, 2013 CSMD Researcher Forrest Hoffman (along with ORNL researchers Jitendra Kumar and Richard Mills), is on the team that...

120

Team Proposes Paradigm Shift in Robotic Space Exploration Team Proposes Paradigm Shift in Robotic Space Exploration  

E-Print Network [OSTI]

Mystery of Gamma-Ray Bursts An international team of astronomers has found good support for the idea that short gamma-ray bursts are caused by violent collisions in star-forming galaxies between a black hole

Arizona, University of

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Registration Now Open for 2013 Science Bowl Teams | Department...  

Broader source: Energy.gov (indexed) [DOE]

Registration Now Open for 2013 Science Bowl Teams Registration Now Open for 2013 Science Bowl Teams October 2, 2012 - 10:00am Addthis NEWS MEDIA CONTACT (202) 586-4940 Washington -...

122

Registration Now Open for 2013 Science Bowl Teams | Department...  

Broader source: Energy.gov (indexed) [DOE]

Registration Now Open for 2013 Science Bowl Teams Registration Now Open for 2013 Science Bowl Teams October 2, 2012 - 10:36am Addthis The National Science Bowl finals take place...

123

Solar Decathlon Teams Working Around the Clock to Assemble Homes...  

Broader source: Energy.gov (indexed) [DOE]

Teams Working Around the Clock to Assemble Homes For Competition Solar Decathlon Teams Working Around the Clock to Assemble Homes For Competition September 14, 2011 - 12:59pm...

124

Wind Powering America's Wind for Schools Team Honored with Wirth...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

America's Wind for Schools Team Honored with Wirth Chair Award Wind Powering America's Wind for Schools Team Honored with Wirth Chair Award May 1, 2012 - 2:46pm Addthis This is an...

125

Michigan Wind Maufacturer Teams with College on Training | Department...  

Broader source: Energy.gov (indexed) [DOE]

Michigan Wind Maufacturer Teams with College on Training Michigan Wind Maufacturer Teams with College on Training July 6, 2010 - 11:14am Addthis Tom Bos is one of nine employees...

126

Student Semi-Finalist Teams Selected to Help Advance Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Student Semi-Finalist Teams Selected to Help Advance Geothermal Energy Student Semi-Finalist Teams Selected to Help Advance Geothermal Energy May 1, 2013 - 1:40pm Addthis The U.S....

127

Geographic dispersion in teams : its history, experience, measurement, and change  

E-Print Network [OSTI]

This thesis begins with the simple argument that geographic dispersion has gone surprisingly unexamined despite its role as the domain-defining construct for geographically dispersed teams (a.k.a. "virtual teams"). The ...

O'Leary, Michael Boyer, 1969-

2002-01-01T23:59:59.000Z

128

Coordinated Searching and Target Identification Using Teams of Autonomous Agents  

E-Print Network [OSTI]

Coordinated Searching and Target Identification Using Teams of Autonomous Agents Christopher Lum;#12;University of Washington Abstract Coordinated Searching and Target Identification Using Teams of Autonomous & Astronautics Many modern autonomous systems actually require significant human involvement. Often, the amount

Washington at Seattle, University of

129

Energy Department Opens Competition to Select Student Teams for...  

Office of Environmental Management (EM)

Opens Competition to Select Student Teams for Solar Decathlon 2015 Energy Department Opens Competition to Select Student Teams for Solar Decathlon 2015 November 1, 2013 - 3:17pm...

130

An Expectation States Approach to Examining Medical Team Information Exchange  

E-Print Network [OSTI]

medical team research has reached a point where the linkages between information exchange, hierarchy, and team performance need to be clearly established. Several individual experiments demonstrate interesting findings, but the effects they display... 2010). Beyond that, teams are embedded in an ?encompassing organizational system, with boundaries and linkages to the broader system context and task environment? (Kozlowski and Ilgen 2006:79). That is, in the current research, teams are generally...

Manago, Bianca

2013-07-30T23:59:59.000Z

131

NCMS PWB Surface Finishes Team project summary  

SciTech Connect (OSTI)

The NCMS PWB Surface Finishes Consortium is just about at the end of the five year program. Dozens of projects related to surface finishes and PWB solder-ability were performed by the team throughout the program, and many of them are listed in this paper. They are listed with a cross reference to where and when a technical paper was presented describing the results of the research. However, due to time and space constraints, this paper can summarize the details of only three of the major research projects accomplished by the team. The first project described is an ``Evaluation of PWB Surface Finishes.`` It describes the solderability, reliability, and wire bondability of numerous surface finishes. The second project outlined is an ``Evaluation of PWB Solderability Test Methods.`` The third project outlined is the ``Development and Evaluation of Organic Solderability Preservatives.``

Kokas, J.; DeSantis, C. [United Technologies Corp., Farmington, CT (United States). Hamilton Standard Div.; Wenger, G. [AT and T, New York, NY (United States)] [and others

1996-04-01T23:59:59.000Z

132

Mobile Robotic Teams Applied to Precision Agriculture  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) and Utah State University?s Center for Self-Organizing and Intelligent Systems (CSOIS) have developed a team of autonomous robotic vehicles applicable to precision agriculture. A unique technique has been developed to plan, coordinate, and optimize missions in large structured environments for these autonomous vehicles in real-time. Two generic tasks are supported: 1) Driving to a precise location, and 2) Sweeping an area while activating on-board equipment. Sensor data and task achievement data is shared among the vehicles enabling them to cooperatively adapt to changing environmental, vehicle, and task conditions. This paper discusses the development of the autonomous robotic team, details of the mission-planning algorithm, and successful field demonstrations at the INEEL.

M.D. McKay; M.O. Anderson; N.S. Flann (Utah State University); R.A. Kinoshita; R.W. Gunderson; W.D. Willis (INEEL)

1999-04-01T23:59:59.000Z

133

Mobile Robotic Teams Applied to Precision Agriculture  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) and Utah State Universitys Center for Self-Organizing and Intelligent Systems (CSOIS) have developed a team of autonomous robotic vehicles applicable to precision agriculture. A unique technique has been developed to plan, coordinate, and optimize missions in large structured environments for these autonomous vehicles in realtime. Two generic tasks are supported: 1) Driving to a precise location, and 2) Sweeping an area while activating on-board equipment. Sensor data and task achievement data is shared among the vehicles enabling them to cooperatively adapt to changing environmental, vehicle, and task conditions. This paper discusses the development of the autonomous robotic team, details of the mission-planning algorithm, and successful field demonstrations at the INEEL.

Anderson, Matthew Oley; Kinoshita, Robert Arthur; Mckay, Mark D; Willis, Walter David; Gunderson, R.W.; Flann, N.S.

1999-04-01T23:59:59.000Z

134

Driving Energy Performance with Energy Management Teams  

E-Print Network [OSTI]

Driving Energy Performance with Energy Management Teams Meredith Younghein ENERGY STAR Industrial Communications Mgr. U.S. Environmental Protection Agency Washington, DC ABSTRACT Companies today face an uncertain energy future. Businesses... face escalating energy prices which can erode profits. Concerns over supply reliability, and possible regulation of carbon emissions create risk. For many industries in the U.S., energy costs are equal to the cost of raw materials or even employee...

Younghein, M.; Tunnessen, W.

2006-01-01T23:59:59.000Z

135

2003 SITE ENVIRONMENTAL REPORT x 2003 Site Environmental Report Team  

E-Print Network [OSTI]

2003 SITE ENVIRONMENTAL REPORT x 2003 Site Environmental Report Team The SER Team realizes. The Environmental and Waste Management Services Division Field SamplingTeam (photo, center right) (From left to right) Robert Metz, Carlee Ogeka, Richard Lagattolla, and Lawrence Lettieri The Environmental

Homes, Christopher C.

136

PI & Project Team Step-By-Step Procedure  

E-Print Network [OSTI]

Proposal Management PI & Project Team Cancel PAF Step-By-Step Procedure Last updated: 4/1/2013 1;Proposal Management PI & Project Team Cancel PAF Step-By-Step Procedure Last updated: 10/01/09 2 of 2 http of 2 http://eresearch.umich.edu Project Team Cancel PAF A PAF can be cancelled during the following

Shyy, Wei

137

Baldrige Enterprise: Updates on Taskforce Teams September/October 2013  

E-Print Network [OSTI]

with the "nonChoir." Integrated Examiner Training Team (Team Leader: Sandra Byrne; Goal: Design a training members used survey findings to custom design and deliver a fourhour workshop. Kellie Glenn and Brian applicants, regardless of where they are located #12;2 Team has identified core principles to guide

138

WRIGHT, MELANIE CLAY. The Effects of Automation on Team Performance and Team Coordination. (Under the direction of David B. Kaber).  

E-Print Network [OSTI]

ABSTRACT WRIGHT, MELANIE CLAY. The Effects of Automation on Team Performance and Team Coordination of automation in a number of work domains, including team environments. However, assessment of the effects of automation on teamwork has been primarily limited to the aviation domain (comparing early conventional

Kaber, David B.

139

Texas Stream Team: Ambassadors for Texas water quality  

E-Print Network [OSTI]

tx H2O | pg. 23 Story by Kathy Wythe Ambassadors for Texas water Roger Miranda of Texas Commission on Environmental Quality volunteers as a certified trainer for Texas Stream Team. Photo by Robert Sams, Texas Stream Team Texas stream... team continued tx H2O | pg. 24 An African proverb says it takes a village to raise a child. However, the Texas Stream Team would say it takes a group of citizens to monitor Texas waters. The Texas Stream Team, formerly Texas Watch, is based...

Wythe, Kathy

2010-01-01T23:59:59.000Z

140

Is Everyone Created Equal? A Social Network Perspective on Personality in Teams  

E-Print Network [OSTI]

One important research topic in team research concerns how team composition (i.e., the configuration of team member attributes such as personality factors) affects team effectiveness. To date, researchers have almost exclusively focused on the role...

Li, Ning

2012-10-19T23:59:59.000Z

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

TRU drum corrosion task team report  

SciTech Connect (OSTI)

During routine inspections in March 1996, transuranic (TRU) waste drums stored at the Radioactive Waste Management Complex (RWMC) were found with pinholes and leaking fluid. These drums were overpacked, and further inspection discovered over 200 drums with similar corrosion. A task team was assigned to investigate the problem with four specific objectives: to identify any other drums in RWMC TRU storage with pinhole corrosion; to evaluate the adequacy of the RWMC inspection process; to determine the precise mechanism(s) generating the pinhole drum corrosion; and to assess the implications of this event for WIPP certifiability of waste drums. The task team investigations analyzed the source of the pinholes to be Hcl-induced localized pitting corrosion. Hcl formation is directly related to the polychlorinated hydrocarbon volatile organic compounds (VOCs) in the waste. Most of the drums showing pinhole corrosion are from Content Code-003 (CC-003) because they contain the highest amounts of polychlorinated VOCs as determined by headspace gas analysis. CC-001 drums represent the only other content code with a significant number of pinhole corrosion drums because their headspace gas VOC content, although significantly less than CC-003, is far greater than that of the other content codes. The exact mechanisms of Hcl formation could not be determined, but radiolytic and reductive dechlorination and direct reduction of halocarbons were analyzed as the likely operable reactions. The team considered the entire range of feasible options, ranked and prioritized the alternatives, and recommended the optimal solution that maximizes protection of worker and public safety while minimizing impacts on RWMC and TRU program operations.

Kooda, K.E.; Lavery, C.A.; Zeek, D.P.

1996-05-01T23:59:59.000Z

142

Codes and Standards Technical Team Roadmap  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth Codes and Standards Technical Team Roadmap June 2013

143

Proposal Team: D.N. Basov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for Plutonium CleanupProposalTeam: D.N. Basov 1 ,

144

DOE Grid Tech Team | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FYBeau Newman Select aCapture2 DOEDepartmentTeam

145

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science Team Meeting 2000

146

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science Team Meeting 20001

147

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science Team Meeting

148

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science Team MeetingNSDL

149

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science Team

150

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science TeamSizes, Fractional

151

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science TeamSizes,

152

ARM - Publications: Science Team Meeting Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD) by Microtops AtmosphericApplication and Evaluation of AcceleratedThe0 Science TeamSizes,Inferring

153

Technical Assessment Team Report | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesign &Report Technical Assessment Team Report

154

emergency management team | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational NuclearhasAdministration goSecuritycdns || Nationaldnn |3team | National

155

One Team … A Historical Perspective  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy's 1000 acres ofOne ControllingTeam - A

156

ARM - 1998 ARM Science Team Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under Maintenance8 ARM Science Team

157

ARM - 1999 ARM Science Team Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under Maintenance8 ARM Science Team9

158

ARM - 2000 ARM Science Team Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under Maintenance8 ARM Science Team90

159

ARM - 2001 ARM Science Team Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under Maintenance8 ARM Science Team901

160

ARM - 2006 Science Team Meeting Presentations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under Maintenance8Meeting6Science Team

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ARM - 2007 Science Team Meeting Presentations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert SouthwestTechnologies |November 2011AstudiesRing Under7 Performance MetricsScience Team

162

Team Cumberland Meetings | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration at YoungSuspect|THEof EnergyTeam Cumberland »

163

Standard Contracts Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |RegulationRenewable EnergySouthwest4, 2010The Standard Contracts Team has

164

Security Commodity Team | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmitted forHighlights Nuclear PhysicsDoDepartment ofSecretsCommodity Team |

165

Team UT-Battelle | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAboutManus Site-InactiveLaboratoryTeam UT-Battelle:

166

AE Work Team Short Roster Strategic Purchasing-Office Supplies v 1.1 2012-01-06 dgk Project Member Team Role UW-Madison Role  

E-Print Network [OSTI]

AE Work Team Short Roster Strategic Purchasing- Office Supplies v 1.1 2012-01-06 dgk Project Member II Work Team Roster: Strategic Purchasing - Office Supplies #12; Team Role UW-Madison Role Tammy Starr Team Leader Office of Human Resources (OHR) Mike Marean Team

Sheridan, Jennifer

167

Forrestal Garage Parking Guidelines February 2015.docx  

Broader source: Energy.gov (indexed) [DOE]

other emergency functions. b) other Government-owned and -leased vehicles, including motor pool vehicles and vehicles assigned for general use; and c) service vehicles and...

168

Forrest M. Hoffman Computational Earth Sciences Group  

E-Print Network [OSTI]

), position at Enviro* *nmental Sciences Di- vision, Oak Ridge National Laboratory, Oak Ridge, Tennessee. Zhu, and S. R. Kawa. An estimate of monthly global emissi* *ons of anthropogenic CO2: Impact

Hoffman, Forrest M.

169

Forrestal Watch Office | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

170

Forrestal Garage Parking Guidelines February 2015.docx  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf Flash2006-14.pdfattachment.pdf6.pdf5.pdfFluorescentDepartment ofSummary

171

LargeLabMap2_Forrestal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 CERN 73-11Large areaLargefor HighDepartmentDOE

172

Forrestal Watch Office | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor's note: SincePlant Name:

173

Team Roster Policy on Policies v1.0 2012-04-09 dgk Project Member Team Role Email UW-Madison Role  

E-Print Network [OSTI]

Team Roster ­ Policy on Policies v1.0 2012-04-09 dgk Project Member Team Role Email UW-Madison Role of Human Resources Administrative Excellence Phase II Work Team Roster: Policy on Policies #12;

Sheridan, Jennifer

174

New Energy Department Team Established to Help Local Authorities...  

Broader source: Energy.gov (indexed) [DOE]

to Help Local Authorities Get Gas Stations Impacted by Hurricane Sandy Back Online New Energy Department Team Established to Help Local Authorities Get Gas Stations Impacted by...

175

Cell Fabrication Facility Team Production and Research Activities...  

Broader source: Energy.gov (indexed) [DOE]

Cell Fabrication Facility Team Production and Research Activities 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

176

Virginia, Maryland teams prepare for Regional Middle School Science...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Virginia, Maryland teams prepare for Regional Middle School Science Bowl March 3, 2005 The Department of Energy's Jefferson Lab, in Newport News, Va., hosts the VirginiaMaryland...

177

2015 Race to Zero Student Design Competition Team Template  

Broader source: Energy.gov [DOE]

Template for student teams to provide a project summary, strategy, data, and technical specifications for the 2015 Race to Zero Student Design Competition.

178

ORNL-led team demonstrates desalination with nanoporous graphene...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Communications 865.576.6448 ORNL-led team demonstrates desalination with nanoporous graphene membrane Researchers created nanopores in graphene (red, and enlarged in the circle...

179

Deputy Secretary Poneman Announces Team led by Oak Ridge National...  

Office of Environmental Management (EM)

Deputy Secretary Poneman Announces Team led by Oak Ridge National Lab Selected to Receive up to 122 Million for Nuclear Energy Innovation Hub Deputy Secretary Poneman Announces...

180

annual hpcrm team: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Future Climate Ridge National Laboratory Researchers Improve Fidelity of Earth System Models 30 New Algorithm Enables 13 National Construction Safety Team Act Annual Report...

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Printing a Car: A Team Effort in Innovation (Text Version) |...  

Broader source: Energy.gov (indexed) [DOE]

video Printing a Car: A Team Effort in Innovation highlighting the demonstration of 3D printing to create a working electric vehicle, live during the International Manufacturing...

182

Energy Department Sends First Energy Saving Team to Federal Government...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

administration. The team, made up of energy savings experts, will assess the facility's energy usage with the goal of not only improving efficiency, but also reducing energy...

183

assessment review team: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Medicine Websites Summary: INFECTION CONTROL LIASION TEAM DEPARTMENT NAME CANCER CENTER DEBBIE LUCKERT CANCER CENTER ELLEN OLIVER CARDIAC CATHETER LAB SHEILA LAFLEUR CARDIAC STEP...

184

Solar Technical Assistance Team (STAT) Summer Webinar Series: Webinar 3  

Broader source: Energy.gov [DOE]

This document details the Solar Technical Assistance Team (STAT) Summer Webinar Series: Webinar 3: Solar Technology Options and Resource Assessment Question & Answer Session on August 15, 2012.

185

RightPath Team Recognized by Secretary Chu | National Nuclear...  

National Nuclear Security Administration (NNSA)

Project Team (IPT), a collaborative group of individuals from the Department of Energy (DOE) and NNSA, was awarded the Secretarial Achievement Award for its efforts to...

186

PARS II - Integrated Project Team Meeting | Department of Energy  

Energy Savers [EERE]

Meeting PARS II - Integrated Project Team Meeting More Documents & Publications PARS II 104 Contractor Monthly Upload Proposed Data Elements for PARS II Web Application Slide 1...

187

AE Space Utilization Work Team Short Roster v 1.5 2012-02-21 dgk Project Member Team Role UW-Madison Role  

E-Print Network [OSTI]

AE Space Utilization Work Team Short Roster v 1.5 2012-02-21 dgk Project Member Team Role UW: Space Utilization - Classroom #12;

Sheridan, Jennifer

188

Balancing Search and Target Response in Cooperative UAV Teams  

E-Print Network [OSTI]

Balancing Search and Target Response in Cooperative UAV Teams Yan Jin, Yan Liao, Marios M of Cincinnati Cincinnati, OH 45221-0030 Abstract-- In this paper, we consider a heterogeneous team of UAVs drawn-time by the actions of all UAVs and their consequences (e.g., sensor readings), which makes the task dynamics

Minai, Ali A.

189

Evolving Cooperative Strategies for UAV Teams Marc D. Richards  

E-Print Network [OSTI]

Evolving Cooperative Strategies for UAV Teams Marc D. Richards mdr@cs.colostate.edu Darrell Whitley to evolve co- operative controllers for teams of UAVs. Our focus is a collaborative search mission, genetic program- ming, simulated robotics 1. INTRODUCTION Advancements in unmanned aerial vehicle (UAV

Whitley, Darrell

190

Design Methodology for Unmannded Aerial Vehicle (UAV) Team Coordination  

E-Print Network [OSTI]

1 Design Methodology for Unmannded Aerial Vehicle (UAV) Team Coordination F.B. da Silva S.D. Scott-mail: halab@mit.edu #12;2 Design Methodology for Unmannded Aerial Vehicle (UAV) Team Coordination by F.B. da Silva, S.D. Scott, and M.L. Cummings Executive Summary Unmanned Aerial Vehicle (UAV) systems, despite

Cummings, Mary "Missy"

191

Flight Demonstrations of Cooperative Control for UAV Teams  

E-Print Network [OSTI]

Flight Demonstrations of Cooperative Control for UAV Teams Jonathan How , Ellis King , and Yoshiaki (UAVs) that was designed as a platform for evaluating autonomous coordination and control algorithms. Future UAV teams will have to autonomously demonstrate cooperative behaviors in dynamic and uncertain

How, Jonathan P.

192

Evolving Cooperative Strategies for UAV Teams Marc D. Richards  

E-Print Network [OSTI]

Evolving Cooperative Strategies for UAV Teams Marc D. Richards mdr@cs.colostate.edu Darrell Whitley to evolve co­ operative controllers for teams of UAVs. Our focus is a collaborative search mission Advancements in unmanned aerial vehicle (UAV) technol­ ogy have made it possible to keep human pilots out

Whitley, Darrell

193

The Collegiate Wind Competition Is Approaching Fast: Meet the Teams  

Office of Energy Efficiency and Renewable Energy (EERE)

In just two weeks, student teams representing colleges and universities across the country will compete in the Energy Departments first ever Collegiate Wind Competition. Meet five of the 10 teams and learn about their innovative designs and ideas for advancing wind energy technologies.

194

The Effect of Collision Avoidance for Autonomous Robot Team Formation  

E-Print Network [OSTI]

on robot team formation focuses on theoretical analysis where real-world factors, such as the size advance to the era of cooperative robots, many autonomous robot team algorithms have emerged. Shape formation is a common and critical task in many cooperative robot applications. While theoretical studies

Jay Yang, Shanchieh

195

This document is produced by the University Print Management Team  

E-Print Network [OSTI]

University Print Management Team. A Guide To Best Practice Printing #12;This document is produced by the University Print Management Team (UPMT) to raise awareness of printing on campus, and to demonstrate how we managing the print process to reduce cost, waste and to improve the functionality and availability of print

Li, Yi

196

PI & Project Team Step-By-Step Procedure  

E-Print Network [OSTI]

Proposal Management PI & Project Team Grants.gov Step-By-Step Procedure Last updated: 8/1/2013 1 Management PI & Project Team Grants.gov Step-By-Step Procedure Last updated: 8/1/2013 4 of 21 http of 21 http://eresearch.umich.edu Grants.gov from eRPM This procedure is a supplement to the rest

Shyy, Wei

197

Library Service Models Self-Study Team April 18, 2012  

E-Print Network [OSTI]

1 Library Service Models Self-Study Team Overviews April 18, 2012 Access to Collections;2 Library Service Models Self-Study Team - Overviews Below are overviews of the options that the Library Libraries and their collections have long been intertwined, with the size of one a key indicator

California at Berkeley, University of

198

REPORT OF THE WASC VISITING TEAM PREPARATORY REVIEW  

E-Print Network [OSTI]

#12;#12;#12;REPORT OF THE WASC VISITING TEAM PREPARATORY REVIEW UNIVERSITY OF CALIFORNIA, SANTA this Report to the Accrediting Commission for Senior Colleges and Universities of the Western Association REVIEW Team Report SECTION I ­ OVERVIEW AND CONTEXT IA ­ Description of Institution and Visit UC Santa

California at Santa Cruz, University of

199

REPORT OF THE WASC VISITING TEAM EDUCATIONAL EFFECTIVENESS REVIEW  

E-Print Network [OSTI]

#12;#12;1 REPORT OF THE WASC VISITING TEAM EDUCATIONAL EFFECTIVENESS REVIEW To the University and therefore submits this Report to the Accrediting Commission for Senior Colleges and Universities Review Team visited the campus and issued a report in February of 2004. The Educational Effectiveness

California at Santa Cruz, University of

200

REUSABLE ARCHITECTURE AND TOOLS FOR TEAMS OF LIGHTWEIGHT  

E-Print Network [OSTI]

aerial vehicles may carry only an onboard computer with relatively low computational power and energy the special requirements for teams of lightweight autonomous heterogeneous robot systems. Due to platform architectures for different tasks. For the exemplary application in autonomous robot soccer teams configurable

Stryk, Oskar von

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Simultaneous Team Assignment and Behavior Recognition from Spatio-temporal Agent Traces  

E-Print Network [OSTI]

-embodied agent teams. We define team activity recognition as the process of identifying team behaviors from to be static; this paper specif- ically addresses the problem of behavior recognition for teams with dynamic to perform multiple be- haviors in parallel. Relaxing the assumption of static team assignment is desirable

Sukthankar, Gita Reese

202

The Student Intervention Team The Student Intervention Team (SIT) at The University of Mississippi exists to address student  

E-Print Network [OSTI]

Page | 1 The Student Intervention Team (SIT) Purpose The Student Intervention Team (SIT) at The University of Mississippi exists to address student behavioral concerns which are not supportive shall make recommendations to the Chancellor, Provost, and Vice Chancellor for Student Life with regard

Tchumper, Gregory S.

203

Cancer: Detect and DestroyCancer: Detect and Destroy PrincetonPrinceton iGEMiGEM TeamTeam  

E-Print Network [OSTI]

Cancer: Detect and DestroyCancer: Detect and Destroy PrincetonPrinceton iGEMiGEM TeamTeam PresentedPresentation Overview What is Synthetic Biology?What is Synthetic Biology? ProjectProject Cancer: Detect and DestroyCancer regeneration Diabetes Cancer therapy Artificial immune system Environmental Biosensing Environmental

Petta, Jason

204

Tiger Team Assessment, Energy Technology Engineering Center  

SciTech Connect (OSTI)

The Office Special Projects within the Office of Environment, Safety, and Health (EH) has the responsibility to conduct Tiger Team Assessments for the Secretary of Energy. This report presents the assessment of the buildings, facilities, and activities under the DOE/Rockwell Contract No. DE-AM03-76SF00700 for the Energy Technology Engineering Center (ETEC) and of other DOE-owned buildings and facilities at the Santa Susana Field Laboratory (SSFL) site in southeastern Ventura County, California, not covered under Contract No. DE-AM03-76SF00700, but constructed over the years under various other contracts between DOE and Rockwell International. ETEC is an engineering development complex operated for DOE by the Rocketdyne Division of Rockwell International Corporation. ETEC is located within SSFL on land owned by Rockwell. The balance of the SSFL complex is owned and operated by Rocketdyne, with the exception of a 42-acre parcel owned by the National Aeronautics and Space Administration (NASA). The primary mission of ETEC is to provide engineering, testing, and development of components related to liquid metals technology and to conduct applied engineering development of emerging energy technologies.

Not Available

1991-04-01T23:59:59.000Z

205

Melrose High trio named top team in 20th New Mexico Supercomputing...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

top team in Supercomputing Challenge Melrose High trio named top team in 20th New Mexico Supercomputing Challenge Each student receives a check for 1,000. The team also...

206

Building America Research Teams: BSC and CARB-20 Years of Advancing...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Building America Research Teams: BSC and CARB-20 Years of Advancing High Performance Homes Building America Research Teams: BSC and CARB-20 Years of Advancing High Performance...

207

Solar Decathlon Team Using Appalachian Mountain History to Model...  

Broader source: Energy.gov (indexed) [DOE]

Using Appalachian Mountain History to Model Home of the Future Solar Decathlon Team Using Appalachian Mountain History to Model Home of the Future March 31, 2011 - 10:52am Addthis...

208

Solar Decathlon Team Leading the Way Toward Sustainable Living...  

Broader source: Energy.gov (indexed) [DOE]

Leading the Way Toward Sustainable Living, Even in the Wake of Disasters Solar Decathlon Team Leading the Way Toward Sustainable Living, Even in the Wake of Disasters August 18,...

209

Sandia National Laboratories: Cool Earth Solar and Sandia Team...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECEnergyRenewable EnergySolarConcentrating Solar PowerCool Earth Solar and Sandia Team Up in First-Ever Public-Private Partnership on Livermore Valley Open Campus Cool Earth...

210

Team Canada Returns to the Solar Decathlon with First Nation...  

Broader source: Energy.gov (indexed) [DOE]

home's solar PV panels will result in an annual net-zero energy balance to ease rising energy costs in remote communities. The team used building materials that are extremely...

211

Unique University and Utility Team Reduces Energy and Pollutants  

E-Print Network [OSTI]

In 1992 the Center for Energy Systems Research of the College of Engineering and Applied Sciences and the Arizona State University (ASU) Facilities Management Department formed a unique Demand Side Management (DSM) team dedicated to reducing energy...

Smith, K. L.; Traill, D. A.; Sears, R. L.; Spielman, M.

212

Record 18 teams prepare for Virginia Regional Middle School Science...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Energy's Jefferson Lab, in Newport News, Va., hosts the Virginia Regional Middle School Science Bowl on Saturday, March 10, with a record 18 teams competing. This is the...

213

Maryland team wins Virginia/Maryland Regional Middle School Science...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Robert Frost Middle School Robert Frost Middle School won the VirginiaMaryland Regional Science Bowl hosted by Jefferson Lab on March 5. The team includes (left to right) Sherwin...

214

Jefferson Lab hosts 22 teams for Virginia High School Science...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Jefferson Lab Science Bowl logo. Jefferson Lab hosts 22 teams for Virginia High School Science Bowl on Feb. 12 February 1, 2005 Some of the brightest young minds in the...

215

ORISE: CDC Travelers' Health Team Receives Innovation Award for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on award-winning website redesign for the CDC How ORISE is Making a Difference The Communication and Education Team of the Travelers' Health Branch of the Centers for Disease...

216

Team Identity and Performance-based Compensation Effects on Performance  

E-Print Network [OSTI]

). Results indicate that while the combination of team and individual performance-based compensation results in the highest performance, the incremental performance boost is higher from the first performance-based reward strategy, regardless of whether...

Blazovich, Janell L.

2010-01-16T23:59:59.000Z

217

MEMORANDUM FOR ELIZABETH MONTOYA TRANSITION TEAM FROM THOMAS...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

g December 1, 200S MEMORANDUM FOR ELIZABETH MONTOYA TRANSITION TEAM FROM THOMAS N. PYKE, J CHIEF INFORMATION OFFICER SUBJECT: Follow-up to our meeting this morning Carl Staton...

218

Building America Research Teams: Spotlight on Home Innovation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Home Innovation and PARR Building America Research Teams: Spotlight on Home Innovation and PARR April 9, 2015 - 10:55am Addthis This article continues our series of profiles about...

219

Road Map Team Proposal Form Proposal: RR7  

E-Print Network [OSTI]

that are designed to improve the brand image, at the regional, national, and international: Rankings and Reputation 1b: Team Theme Name: Create Increase Brand Visibility of the Binghamton brand at the regional, national and international level 3

Suzuki, Masatsugu

220

RICCI Sophie Global Change and Climate Modeling Team  

E-Print Network [OSTI]

RICCI Sophie Global Change and Climate Modeling Team CERFACS - Toulouse, FRANCE Technical Report TR covariance matrix#17;. This hypothesis stems from the T S water mass properties conservation over long term

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Integrated Project Team Guide for Formation and Implementation  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide provides detailed guidance of the preferred processes to form and implement an Integrated Project Team (IPT) in support of proper project execution as prescribed in DOE O 413.3B.

2012-02-03T23:59:59.000Z

222

Student Teams from Massachusetts and California Win Energy Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

raced model cars powered by lithium-ion batteries. Trinity Junior High School from Fort Smith, Arkansas, won the design portion of the car competition. Both teams received 500...

223

(International Energy Agency Heat Pump Center Working Team meeting)  

SciTech Connect (OSTI)

The traveler, serving as Delegate from the United States Heat Pump Center National Team, participated in the activities of the second International Energy Agency Heat Pump Center (IEA-HPC) Working Team meeting. This included a 20 minute presentation by the traveler about the Development and Activities of the IEA Heat Pump Center US National Team.'' Highlights of this meeting included development of 1991 IEA-HPC work plans including a prioritization of activities, introduction of the newly appointed IEA-HPC Advisory Board, and discussion of a new IEA Clearinghouse Network initiative. Pre-meeting discussions were held with IEA-HPC staff members which focused on US Heat Pump Center National Team contributions to the IEA-HPC Newsletter and participation in other IEA-HPC sponsored activities.

Broders, M.A.

1990-11-20T23:59:59.000Z

224

A framework for knowledge-based team training  

E-Print Network [OSTI]

Teamwork is crucial to many disciplines, from activities such as organized sports to economic and military organizations. Team training is difficult and as yet there are few automated tools to assist in the training task. As with the training...

Miller, Michael Scott

2009-06-02T23:59:59.000Z

225

Forming Teams for Teaching Programming based on Static Code Analysis  

E-Print Network [OSTI]

The use of team for teaching programming can be effective in the classroom because it helps students to generate and acquire new knowledge in less time, but these groups to be formed without taking into account some respects, may cause an adverse effect on the teaching-learning process. This paper proposes a tool for the formation of team based on the semantics of source code (SOFORG). This semantics is based on metrics extracted from the preferences, styles and good programming practices. All this is achieved through a static analysis of code that each student develops. In this way, you will have a record of students with the information extracted; it evaluates the best formation of teams in a given course. The team's formations are based on programming styles, skills, pair programming or with leader.

Arosemena-Trejos, Davis; Clunie, Clifton

2012-01-01T23:59:59.000Z

226

Solar Technical Assistance Team (STAT) Summer Webinar Series: Webinar 4  

Broader source: Energy.gov [DOE]

This document details the questions and answers from the Solar Technical Assistance Team (STAT) Summer Webinar Series: Webinar 4: Policy for Distributed Solar 101: What Makes a Solar DG Market? on August 22, 2012.

227

Collaborative Systems Thinking Research: Exploring systems thinking within teams  

E-Print Network [OSTI]

Collaborative Systems Thinking Research: Exploring systems thinking within teams Caroline T. Lamb research that seeks to develop an empirical basis for collaborative systems thinking, defined as "an of thinking styles, design processes, tools, and communication media to consider system attributes

de Weck, Olivier L.

228

Top Management Team Personal Wealth, Within-Team Diversity and the Implications for Firm-Level Risk Taking  

E-Print Network [OSTI]

follows the style of Academy of Management Journal. 2 reflections of their top management teams, or the upper echelon of the organization (Hambrick, 2007; Hambrick & Mason, 1984). According to this theory, top managers? characteristics influence...

Campbell, Joanna

2012-07-16T23:59:59.000Z

229

Teams in transition: an ethnographic case-study highlighting cohesion and leadership in a collegiate athletic team  

E-Print Network [OSTI]

While a great deal of theoretical work has been conducted describing group development, there is an underdeveloped area in the examination of the development of a group or team that is faced with constant transition. The purpose of this dissertation...

Browning, Blair Wilson

2009-05-15T23:59:59.000Z

230

NOAA Committee Memberships, 2004-2008 Eddie N. Bernard, Member, NOAA Tsunami Program Team, 2005-present  

E-Print Network [OSTI]

. Koehn, Member, NOAA Science, Technology, and Infusion Program Team, 2003-2005 Mark P. Koehn, Member

231

Report on NJIT Self-Study: Preparing for Visit of Team Chair  

E-Print Network [OSTI]

Report on NJIT Self-Study: Preparing for Visit of Team Chair and Visiting Team Presentation and Spring 2012 · October 7, 2011: Report released to NJIT Community and Team Chair · November 8-10, 2011 2012 · Fall 2011 ­ Campus community reviews draft self-study report. ­ Evaluation Team Chair reviews

Bieber, Michael

232

Team China Transforms Shipping Containers into a Solar-Powered House  

Broader source: Energy.gov [DOE]

Team China is turning shipping containers into their 2011 Solar Deacthlon home design. Check it out!

233

Maneki-Neko Team Description for Iran Open UAV 2013 -Teheran, Iran  

E-Print Network [OSTI]

Maneki-Neko Team Description for Iran Open UAV 2013 - Teheran, Iran Intelligent Autonomous Systems the competition. One of those teams was the UvA Drone Team. The Dutch team participating at the Iran Open 2013 to perception and control algorithms which leaded to this frame- work. The Iran Open 2013 gives the possibility

Visser, Arnoud

234

Tiger Team assessment of the Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

The purpose of the Safety and Health (S H) Subteam assessment was to determine the effectiveness of representative safety and health programs at the Idaho National Engineering Laboratory (INEL) site. Four Technical Safety Appraisal (TSA) Teams were assembled for this purpose by the US Department of Energy (DOE), Deputy Assistant Secretary for Safety and Quality Assurance, Office of Safety Appraisals (OSA). Team No. 1 reviewed EG G Idaho, Inc. (EG G Idaho) and the Department of Energy Field Office, Idaho (ID) Fire Department. Team No. 2 reviewed Argonne National Laboratory-West (ANL-W). Team No. 3 reviewed selected contractors at the INEL; specifically, Morrison Knudsen-Ferguson of Idaho Company (MK-FIC), Protection Technology of Idaho, Inc. (PTI), Radiological and Environmental Sciences Laboratory (RESL), and Rockwell-INEL. Team No. 4 provided an Occupational Safety and Health Act (OSHA)-type compliance sitewide assessment of INEL. The S H Subteam assessment was performed concurrently with assessments conducted by Environmental and Management Subteams. Performance was appraised in the following technical areas: Organization and Administration, Quality Verification, Operations, Maintenance, Training and Certification, Auxiliary Systems, Emergency Preparedness, Technical Support, Packaging and Transportation, Nuclear Criticality Safety, Security/Safety Interface, Experimental Activities, Site/Facility Safety Review, Radiological Protection, Personnel Protection, Worker Safety and Health (OSHA) Compliance, Fire Protection, Aviation Safety, Medical Services, and Firearms Safety.

Not Available

1991-08-01T23:59:59.000Z

235

2010 Atmospheric System Research (ASR) Science Team Meeting Summary  

SciTech Connect (OSTI)

This document contains the summaries of papers presented in poster format at the March 2010 Atmospheric System Research Science Team Meeting held in Bethesda, Maryland. More than 260 posters were presented during the Science Team Meeting. Posters were sorted into the following subject areas: aerosol-cloud-radiation interactions, aerosol properties, atmospheric state and surface, cloud properties, field campaigns, infrastructure and outreach, instruments, modeling, and radiation. To put these posters in context, the status of ASR at the time of the meeting is provided here.

Dupont, DL

2011-05-04T23:59:59.000Z

236

Task team approach to safeguards and security designs  

SciTech Connect (OSTI)

In 1987, a US Department of Energy (DOE) supported task team was organized at the request of the DOE Idaho Field Office (DOE-ID) to provide support for safeguards and security (S S) designs of the Special Isotope Separation (SIS) facility. Prior to deferral of the project, the SIS facility was to be constructed at the Idaho National Engineering Laboratory (INEL) to produce weapons grade plutonium from DOE owned fuel grade plutonium. The task team was assembled to provide the resources necessary to assure that safeguards and security considerations were included as an integral part of the design of the facility, and that SIS designs would take advantage of available technology in the areas of physical security, measurements, accountability, and material and personnel tracking. The task team included personnel from DOE/Office of Safeguards and Security (DOE-OSS), DOE-ID, DOE contractors, and the national laboratories providing a wide range of expertise and experience. The team reviewed proposed designs and provided recommendations for safeguards and security features in each stage of the design process. The value of this approach to safeguards and security designs will be discussed with respect to benefits, lessons learned, and recommendations for future applications. 5 refs.

Zack, N.R. (Los Alamos National Lab., NM (United States)); Wilkey, D.D. (USDOE Idaho Operations Office, Idaho Falls, ID (United States))

1991-01-01T23:59:59.000Z

237

AQU 04 Portable Algae Flow Cytometer Team Members  

E-Print Network [OSTI]

AQU 04 Portable Algae Flow Cytometer Team Members · David Caron, Faculty · Han-Chieh Chang · Yu-Chong Tai, Faculty, PI* * Primary Contact Overview The portable algae flow cytometer is a project that aims to expedite research in algae biology using microfluid-based and state-of-the-art detection

California at Los Angeles, University of

238

Public Safety Team (PST) Organizational Structure for Public Safety Management  

E-Print Network [OSTI]

Public Safety Team (PST) President Organizational Structure for Public Safety Management for public safety· Coordinates public communications, legal,· and IT support for public safety Maintains· response to safety issues involving individual students and student behavior Ensures appropriate

239

A team of students from the University of Illinois won  

E-Print Network [OSTI]

couldn't beat a house wrapped in solar panels," referring to the house designed by the German team, which, and engineered bamboo. It is outfitted with a rooftop array of solar panels. The house was designed to meet advisers, industrial design professor David Weightman, the home has "more solar panels than would

Liu, Gang "Logan"

240

Sandia National Laboratories Information Design Assurance Red TeamTM  

E-Print Network [OSTI]

, and process control system security. Sandia is a multiprogram laboratory operated by Sandia Corporation-disciplinary assessment team working to improve the security of critical systems through systematic analysis using metrics, and tools for analyzing the security robustness of information systems contributing to our

Fuerschbach, Phillip

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Printing a Car: A Team Effort in Innovation  

ScienceCinema (OSTI)

The story behind the realization of a unique project: the building of a 3D printed electric car, as told by team members. Strati materialized out of 15% carbon-reinforced ABS thermoplastic in a record 44 hours, under the very eyes of attendees at this year's International Manufacturing Technology Show (IMTS).

Rogers, Jay; Love, Lonnie; Johnson, Mark; Ivester, Rob; Neff, Rick; Blue, Craig;

2014-11-24T23:59:59.000Z

242

IT Operational Oversight Committee Round #4: Software Licensing Strategies Team  

E-Print Network [OSTI]

, University Development Office Cliff Johnston* , Professor of Soil Chemistry, College of Agriculture Julie license purchasing and management. The team evaluated software purchasing and licensing information from a variety of sources that included data from central purchasing (i.e., SRM), credit card purchases (not

243

Adaptive Management Team Total Dissolved Gas in the  

E-Print Network [OSTI]

Adaptive Management Team Total Dissolved Gas in the Columbia and Snake Rivers Evaluation of the 115 Percent Total Dissolved Gas Forebay Requirement Washington State Department of Ecology and State of Oregon Department of Environmental Quality Final January 2009 Publication no. 09-10-002 #12;Publication and Contact

244

Easing Team Politics in Agile Usability A Concept Mapping Approach  

E-Print Network [OSTI]

questioned about their challenges in agile development and about their overall impressions of a concept the development process and impact project cost and duration. Agile development methodologies rely on team, the increased attention to usability adds further stress to the agile usability development system. Cultural

McCrickard, Scott

245

Competitive Game Development: Software Engineering as a Team Sport*  

E-Print Network [OSTI]

Competitive Game Development: Software Engineering as a Team Sport* Walt Scacchi Institute, Zurich, 9 June 2012 #12;Overview · The what, why, how and outcomes of game software development of game software development competitions · Competition affords the opportunity for alternative

Scacchi, Walt

246

US ARMY CORPS OF ENGINEERS PLANNING AND RESPONSE TEAM  

E-Print Network [OSTI]

US ARMY CORPS OF ENGINEERS PLANNING AND RESPONSE TEAM INFRASTRUCTURE ASSESSMENT MISSION GUIDE March, hazardous materials, water and wastewater infrastructure (e.g. treatment facilities, lift stations, other Federal agencies (e.g. Bureau of Reclamation). The IA PRT program also supports water/wastewater

US Army Corps of Engineers

247

Amsterdam Oxford Joint Rescue Forces Team Description Paper  

E-Print Network [OSTI]

Amsterdam Oxford Joint Rescue Forces Team Description Paper Virtual Robot competition Rescue van Weelden1 , Chaim Bastiaan1 , Niels Out1 , Olaf Zwennes1 , Sev´aztian Soffia Ot´arola1 , Julian de://www.jointrescueforces.eu Abstract. With the progress made in active exploration, the robots of the Joint Rescue Forces are capable

Visser, Arnoud

248

Nevada National Security Site Groundwater Program Welcomes Peer Review Team  

Broader source: Energy.gov [DOE]

Recently, an independent peer review team was invited to assess the groundwater characterization program at the Nevada National Security Site (NNSS). This nationally recognized group of experts, from various external organizations, will examine the computer modeling approach developed to better understand how historic underground nuclear testing in Yucca Flat affected the groundwater.

249

Initial Package Design Concepts Integrated Product Team (IPT) Summary Report  

SciTech Connect (OSTI)

Initially, the question of transporting TRU waste to WIPP was raised as part of the EM Integration activities. The issue was re-examined as part of the system-wide view to re-engineer the TRU waste program. Consequently, the National Transportation Program and the National TRU Waste Program, in a cooperative effort, made a commitment to EM-20 to examine the feasibility of using rail to transport TRU waste material to WIPP. In December of 1999 Mr. Philip Altomare assembled a team of subject matter experts (SME) to define initial concepts for a Type B package capable of shipping TRU waste by rail (see Attachment 1 for a list of team members). This same team of experts also provided input to a preliminary study to determine if shipping TRU waste by rail could offer cost savings or other significant advantages over the current mode of operation using TRUPACT-II packages loaded on truck. As part of the analysis, the team also identified barriers to implementing rail shipments to WIPP and outlined a path forward. This report documents the findings of the study and its initial set of recommendations. As the study progressed, it was expanded to include new packages for truck as well as rail in recognition of the benefits of shipping large boxes and contaminated equipment.

Moss, J.; Luke, Dale Elden

2000-03-01T23:59:59.000Z

250

agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report  

E-Print Network [OSTI]

1 agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report Northwest Region Reports - 2006 Jim Project GREEEN Michigan State Horticulture Society Michigan Apple Research Committee Michigan apple sites: www.ams.usda.gov/marketnews.htm www.bhfm.com NW Michigan Pome Fruit Code-a-phone/Apple Maturity

251

MSU Fruit Team 2011 Apple Maturity Report Northwest Region Reports  

E-Print Network [OSTI]

1 MSU Fruit Team 2011 Apple Maturity Report Northwest Region Reports During the harvest season, apples from different regions are collected for maturity testing. The data is then compiled by MSU Extension educators into recommendations for harvest and storage of the most commonly grown apple varieties

252

agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report  

E-Print Network [OSTI]

1 agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report Northwest Region Reports - 2008 Michigan Apple Research Committee Michigan apple Shippers MSU Extension MSU AgBioResearch Current pricing information can be obtained at the following web sites: http://www.bhfm.com/ NW Michigan Pome Fruit Code-a-phone/Apple

253

MSU Fruit Team 2010 Apple Maturity Report Northwest Region Reports  

E-Print Network [OSTI]

1 MSU Fruit Team 2010 Apple Maturity Report Northwest Region Reports During the harvest season, apples from different regions are collected for maturity testing. The data is then compiled by MSU Extension educators into recommendations for harvest and storage of the most commonly grown apple varieties

254

agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report  

E-Print Network [OSTI]

1 agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report Northwest Region Reports - 2009 Michigan Apple Research Committee Michigan Apple Shippers MSU Extension MSU AgBioResearch NW MICHIGAN APPLE MATURITY REPORT #1 September 16, 2009 General Comments - This year the NWMHRS will be testing apples

255

agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report  

E-Print Network [OSTI]

1 agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report Northwest Region Reports - 2007 Nikki Horticulture Society Michigan Apple Research Committee Michigan apple Shippers MSU Extension MSU Ag Pome Fruit Code-a-phone/Apple Maturity Line (231) 947-3063 NW MICHIGAN APPLE MATURITY REPORT #1 August

256

agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report  

E-Print Network [OSTI]

1 agbioresearch.msu.edu MSU Fruit Team Apple Maturity Report Northwest Region Reports - 2005 Jim Project GREEEN Michigan State Horticulture Society Michigan Apple Research Committee Michigan apple sites: www.ams.usda.gov/marketnews.htm www.bhfm.com NW Michigan Pome Fruit Code-a-phone/Apple Maturity

257

,,DreamTeam" -a platform for synchronous collaborative applications  

E-Print Network [OSTI]

architecture and encourages rapid prototyping. In addition to several demonstration applications, two serious environment, a runtime environment and a simulation envir- onment. In the following, the basic DreamTeam concept as well as the three components are described in more detail. 2.1 The concept Architecture: Co

Steimann, Friedrich

258

Executive Budget Support Team Office of the President  

E-Print Network [OSTI]

Executive Budget Support Team Office of the President Provost / Executive Vice President Institute Budget Planning & Admin. Jim Kirk Asst Budget Director Vacant Sr. Budget Analyst Ebony Thompson Budget Development & Capital Budgets Director Lisa Godfrey Systems Support Engr II Vacant Sr. Budget

Jacobs, Laurence J.

259

Berkeley Lab Scientist Co-Leads Breast Cancer Dream Team  

ScienceCinema (OSTI)

An $16.5 million, three-year grant to develop new and more effective therapies to fight breast cancer was awarded today to a multi-institutional Dream Team of scientists and clinicians that is co-led by Joe Gray, a renowned cancer researcher with the U.S. Department of Energys Lawrence Berkeley National Laboratory. http://newscenter.lbl.gov/

Gray, Joe

2013-05-29T23:59:59.000Z

260

Optimal Positioning Strategies for Shape Changes in Robot Teams  

E-Print Network [OSTI]

Fierro School of Electrical & Computer Engineering Oklahoma State University Stillwater, OK 74078, USA for complete regulation of the formation size via constraints on the shape scale. We expect that these results, a system composed of teams of cooperative robots is desirable because of its flexibility, robustness

Spletzer, John R.

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Printing a Car: A Team Effort in Innovation  

SciTech Connect (OSTI)

The story behind the realization of a unique project: the building of a 3D printed electric car, as told by team members. Strati materialized out of 15% carbon-reinforced ABS thermoplastic in a record 44 hours, under the very eyes of attendees at this year's International Manufacturing Technology Show (IMTS).

Rogers, Jay; Love, Lonnie; Johnson, Mark; Ivester, Rob; Neff, Rick; Blue, Craig; ,

2014-09-17T23:59:59.000Z

262

CMDragons 2007 Team Description James Bruce Stefan Zickler Mike Licitra  

E-Print Network [OSTI]

highlights represented in this year's system. CMDragons 2007 is the Carnegie Mellon entry for the Robo. The paper then finishes with concluding remarks. 2 System Overview Our team consists of seven homogeneous The robot drive system and kicker are shown in Figure 2. Each robot is omni-directional, with four custom

263

GA Tech Campus Emergency Response Team STANDARD OPERATING PROCEDURE  

E-Print Network [OSTI]

GA Tech Campus Emergency Response Team GT-CERT STANDARD OPERATING PROCEDURE 09/29/2010 #12;2 Table as a condition for the appointment and continuing maintenance of membership. GT-CERT members operate for and to respond to emergency/disaster situations. 2.0 Purpose To establish procedures for the activation

264

x2002 SITE ENVIRONMENTAL REPORT The Environmental Services Field Sampling Team  

E-Print Network [OSTI]

, Environmental Services Division Barbara Pierce, Plant Engineering Jason Remien, Environmental Services Divisionx2002 SITE ENVIRONMENTAL REPORT The Environmental Services Field Sampling Team (Back from left). The Analytical Services Laboratory Team Back row from left to right) Lisa Muench, William

Homes, Christopher C.

265

2012 NYS Fair 4-H Robotics Challenge Team Name:________________ County: ___________ Date: __________  

E-Print Network [OSTI]

2012 NYS Fair 4-H Robotics Challenge Team Name:________________ County: ___________ Date: __________ Team Members: Years at participating in 4-H Robotics Program _______ Level: A______ B_______ Excellent Great Good Comments Robot Design: Ability to withstand the rigors of competition; Easy to repair

Keinan, Alon

266

``Climate Modelling & Global Change'' scientific report ``Climate Modelling & Global Change'' Team  

E-Print Network [OSTI]

``Climate Modelling & Global Change'' scientific report ``Climate Modelling & Global Change'' Team) : : : : : : : : : : : : : : : : : 6 2.2 Anthropogenic climate change studies: scenario experiments (96) : : : : : : : : : 7 2 following its creation, the ``Climate Modelling & Global Change'' team had to make its proofs in order

267

DOE Announces $1.4 Million for Industry-Laboratory Teams to Study...  

Office of Environmental Management (EM)

.4 Million for Industry-Laboratory Teams to Study Using Nuclear Energy for Clean Hydrogen DOE Announces 1.4 Million for Industry-Laboratory Teams to Study Using Nuclear Energy for...

268

RELATIONSHIP BETWEEN TEACHER JOB SATISFACTION AND TEAMING STRUCTURE AT THE MIDDLE SCHOOL LEVEL  

E-Print Network [OSTI]

This study compared the perceptions of middle school teachers regarding the characteristics of teams in theirs school and their job satisfaction levels. The study used two instruments to collect data. The Team Excellence ...

Oliver, Randy Eugene

2008-02-01T23:59:59.000Z

269

Approaches To Crisis Prevention In Lean Product Development By High Performance Teams And Through Risk Management  

E-Print Network [OSTI]

This thesis investigates crisis prevention in lean product development, focusing on high performance teams and risk management methods.

Oehmen, Josef

270

The influence of interpersonal flexibility on work team conflict over time  

E-Print Network [OSTI]

, 1990; Pfeffer, 1981; Tjosvold, 1991; Van de Vliert & De Dreu, 1994). The complex issue of team conflict continues to receive attention today. More recent investigations have attempted to discern in what contexts team conflict can be beneficial (e... the approach (Osterman, 1994). As the use of work teams in business organizations fast becomes the norm (De Dreu & Weingart, 2003; De Dreu, Harinck, & Van Vianen, 1999; Wall & Callister, 1995), the need for continued examination of team conflict in a natural...

Baugh, Frank Godard

2004-11-15T23:59:59.000Z

271

Tiger Team Assessment of the Los Alamos National Laboratory  

SciTech Connect (OSTI)

This report documents the Tiger Team Assessment of the Los Alamos National Laboratory (LANL) located in Los Alamos, New Mexico. LANL is operated for the US Department of Energy (DOE) by the University of California. The Tiger Team Assessment was conducted from September 23 to November 8, 1991, under the auspices of the DOE Office of Special Projects, Office of Assistant Secretary for Environment, Safety and Health. The assessment was comprehensive, encompassing environmental, safety, and health (ES H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal LANL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors' management of ES H/quality assurance programs was conducted. This volume discusses findings concerning the environmental assessment.

Not Available

1991-11-01T23:59:59.000Z

272

Hydrogen Production Technical Team Roadmap | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject:GroundtoProduction Technical Team Roadmap June 2013

273

Multimodal Interaction for Enhancing Team Coordination on the Battlefield  

E-Print Network [OSTI]

of DOCTOR OF PHILOSOPHY Chair of Committee, Tracy Hammond Committee Members, Nancy Amato Dylan Shell Ann McNamara Head of Department, Hank Walker August 2013 Major Subject: Computer Science Copyright 2013 Danielle Nicole Cummings ABSTRACT Team... creative solutions in my research, Dr. Dylan Shell, for providing guidance and constructive feedback when I needed it, and Dr. Nancy Amato, for helping me keep my priorities straight and supporting me during tough times. I?d also like to thank Dr...

Cummings, Danielle

2013-06-05T23:59:59.000Z

274

Agile Team Perceptions of Productivity Factors Claudia Melo, Daniela S. Cruzes, Fabio Kon and Reidar Conradi  

E-Print Network [OSTI]

Agile Team Perceptions of Productivity Factors Claudia Melo, Daniela S. Cruzes, Fabio Kon,conradi}@idi.ntnu.no) Abstract--In this paper, we investigate agile team perceptions of factors impacting their productivity. Within this overall goal, we also investigate which productivity concept was adopted by the agile teams

275

Tiger Team assessment of the Lawrence Berkeley Laboratory, Washington, DC  

SciTech Connect (OSTI)

This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment of the Lawrence Berkeley Laboratory (LBL) conducted from January 14 through February 15, 1991. The purpose of the assessment was to provide the Secretary of Energy with the status of environment, safety, and health (ES H) programs at LBL. The Tiger Team concluded that curtailment of cessation of any operations at LBL is not warranted. However, the number and breadth of findings and concerns from this assessment reflect a serious condition at this site. In spite of its late start, LBL has recently made progress in increasing ES H awareness at all staff levels and in identifying ES H deficiencies. Corrective action plans are inadequate, however, many compensatory actions are underway. Also, LBL does not have the technical expertise or training programs nor the tracking and followup to effectively direct and control sitewide guidance and oversight by DOE of ES H activities at LBL. As a result of these deficiencies, the Tiger Team has reservations about LBL's ability to implement effective actions in a timely manner and, thereby, achieve excellence in their ES H program. 4 figs., 24 tabs.

Not Available

1991-02-01T23:59:59.000Z

276

Tiger team assessment of the Argonne Illinois site  

SciTech Connect (OSTI)

This report documents the results of the Department of Energy's (DOE) Tiger Team Assessment of the Argonne Illinois Site (AIS) (including the DOE Chicago Operations Office, DOE Argonne Area Office, Argonne National Laboratory-East, and New Brunswick Laboratory) and Site A and Plot M, Argonne, Illinois, conducted from September 17 through October 19, 1990. The Tiger Team Assessment was conducted by a team comprised of professionals from DOE, contractors, consultants. The purpose of the assessment was to provide the Secretary of Energy with the status of Environment, Safety, and Health (ES H) Programs at AIS. Argonne National Laboratory-East (ANL-E) is the principal tenant at AIS. ANL-E is a multiprogram laboratory operated by the University of Chicago for DOE. The mission of ANL-E is to perform basic and applied research that supports the development of energy-related technologies. There are a significant number of ES H findings and concerns identified in the report that require prompt management attention. A significant change in culture is required before ANL-E can attain consistent and verifiable compliance with statutes, regulations and DOE Orders. ES H activities are informal, fragmented, and inconsistently implemented. Communication is seriously lacking, both vertically and horizontally. Management expectations are not known or commondated adequately, support is not consistent, and oversight is not effective.

Not Available

1990-10-19T23:59:59.000Z

277

Missouri Agricultural Energy Saving Team-A Revolutionary Opportunity (MAESTRO)  

SciTech Connect (OSTI)

The Missouri Agricultural Energy Saving Team-A Revolutionary Opportunity (MAESTRO) program brought together a team of representatives from government, academia, and private industry to enhance the availability of energy efficiency services for small livestock producers in the State of Missouri. The Missouri Department of Agriculture (MDA) managed the project via a subcontract with the University of Missouri (MU), College of Agriculture Food and Natural Resources, MU Extension, the MU College of Human Environmental Sciences, the MU College of Engineering, and the Missouri Agricultural and Small Business Development Authority (MASBDA). MU teamed with EnSave, Inc, a nationally-recognized expert in agricultural energy efficiency to assist with marketing, outreach, provision of farm energy audits and customer service. MU also teamed with independent home contractors to facilitate energy audits of the farm buildings and homes of these livestock producers. The goals of the project were to: (1) improve the environment by reducing fossil fuel emissions and reducing the total energy used on small animal farms; (2) stimulate the economy of local and regional communities by creating or retaining jobs; and (3) improve the profitability of Missouri livestock producers by reducing their energy expenditures. Historically, Missouri scientists/engineers conducted programs on energy use in agriculture, such as in equipment, grain handling and tillage practices. The MAESTRO program was the first to focus strictly on energy efficiency associated with livestock production systems in Missouri and to investigate the applicability and potential of addressing energy efficiency in animal production from a building efficiency perspective. A. Project Objectives The goal of the MAESTRO program was to strengthen the financial viability and environmental soundness of Missouri's small animal farms by helping them implement energy efficient technologies for the production facility, farm buildings, and the homes on these farms. The expected measurable outcomes of the project were to improve the environment and stimulate the economy by: Reducing annual fossil fuel emissions by 1,942 metric tons of carbon dioxide equivalent, reducing the total annual energy use on at least 323 small animal farms and 100 farm homes by at least 8,000 kWh and 2,343 therms per farm. Stimulating the economy by creating or retaining at least 69 jobs, and saving small animal farmers an average of $2,071 per farm in annual energy expenditures. B. Project Scope The MAESTRO team chose the target population of small farms because while all agriculture is traditionally underserved in energy efficiency programs, small farms were particularly underserved because they lack the financial resources and access to energy efficiency technologies that larger farms deploy. The MAESTRO team reasoned that energy conservation, financial and educational programs developed while serving the agricultural community could serve as a national model for other states and their agricultural sectors. The target population was approximately 2,365 small animal farm operations in Missouri, specifically those farms that were not by definition a confined animal feeding operation (CAFO). The program was designed to create jobs by training Missouri contractors and Missouri University Extension staff how to conduct farm audits. The local economy would be stimulated by an increase in construction activity and an increasing demand for energy efficient farm equipment. Additionally, the energy savings were deemed critical in keeping Missouri farms in business. This project leveraged funds using a combination of funds from the Missouri Department of Natural Resources Missouri Energy Center and its Soil and Water Conservation Program, from the state's Linked Deposits, MASBDA's agricultural loan guarantee programs, and through the in-kind contribution of faculty and staff time to the project from these agencies and MU. Several hundred Missouri livestock producers were contacted during the MAESTRO project. Of the

McIntosh, Jane [MDA; Schumacher, Leon [University of Missouri

2014-10-23T23:59:59.000Z

278

Constitution of the MIT Solar Electric Vehicle Team We, the workers of the Solar Electric Vehicle Team, in order to form a more  

E-Print Network [OSTI]

Constitution of the MIT Solar Electric Vehicle Team 1 PURPOSE We, the workers of the Solar Electric the blessings of fast Solar Cars to ourselves and our Posterity, do ordain and establish this Constitution for the Solar Electric Vehicle Team of the Massachusetts Institute of Technology (henceforth "TFP"). 2

Williams, Brian C.

279

Tiger Team Assessment of the Pantex Plant, Amarillo, Texas  

SciTech Connect (OSTI)

This document contains the findings and associated root causes identified during the Tiger Team Assessment of the Department of Energy's (DOE) Pantex Plant in Amarillo, Texas. This assessment was conducted by the Department's Office of Environment, Safety and Health between October 2 and 31, 1989. The scope of the assessment of the Pantex Plant covered all areas of environment, safety and health (ES H) activities, including compliance with federal, state, and local regulations, requirements, permits, agreements, orders and consent decrees, and DOE ES H Orders. The assessment also included an evaluation of the adequacy of DOE and site contractor ES H management programs. The draft findings were submitted to the Office of Defense Programs, the Albuquerque Operations Office, the Amarillo Area Office, and regulatory agencies at the conclusion of the on-site assessment activities for review and comment on technical accuracy. Final modifications and any other appropriate changes have been incorporated in the final report. The Tiger Team Assessment of the Pantex Plant is part of the larger Tiger Team Assessment program which will encompass over 100 DOE operating facilities. The assessment program is part of a 10-point initiative announced by Secretary of Energy James D. Watkins on June 27, 1989, to strengthen environmental protection and waste management activities in the Department. The results of the program will provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and site contractor ES H management programs, and DOE-wide ES H compliance trends.

Not Available

1990-02-01T23:59:59.000Z

280

WIPP Mine Rescue Team Sweeps Southeast Missouri Competition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory inApproved ModificationsTeam

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Lab team makes unique contributions to the first bionic eye  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LOSEngineering |Lab SubcontractorLab team makes

282

Distributed Planning and Control for Teams of Cooperating Mobile Robots  

SciTech Connect (OSTI)

This CRADA project involved the cooperative research of investigators in ORNL's Center for Engineering Science Advanced Research (CESAR) with researchers at Caterpillar, Inc. The subject of the research was the development of cooperative control strategies for autonomous vehicles performing applications of interest to Caterpillar customers. The project involved three Phases of research, conducted over the time period of November 1998 through December 2001. This project led to the successful development of several technologies and demonstrations in realistic simulation that illustrated the effectiveness of the control approaches for distributed planning and cooperation in multi-robot teams.

Parker, L.E.

2004-06-15T23:59:59.000Z

283

Teaming Partner List Available for the Innovative Composites Institute FOA  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartmentChallengeCompliance7/109THETTU UTeam Summary Team|

284

Team New Jersey's Beach House Approaches Sustainable Design from a  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration at YoungSuspect|THEof EnergyTeam Cumberland

285

US DRIVE Hydrogen Storage Technical Team Roadmap | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. of Energy,UCOR ContractStorage Technical Team Roadmap US

286

US DRIVE Vehicle Systems and Analysis Technical Team Roadmap | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept. of Energy,UCOR ContractStorage Technical Team Roadmap USof

287

Jefferson Lab, ODU team up for center | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson LabJefferson LabJLab OpenLabodu-team-centerLab,

288

Team advances understanding of the Greenland Ice Sheet's meltwater  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAboutManus Site-InactiveLaboratoryTeam

289

Tiger Team assessment of the Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

This report documents the Tiger Team Assessment of the Idaho National Engineering Laboratory (INEL) located in Idaho Falls, Idaho. INEL is a multiprogram, laboratory site of the US Department of Energy (DOE). Overall site management is provided by the DOE Field Office, Idaho; however, the DOE Field Office, Chicago has responsibility for the Argonne National Laboratory-West facilities and operations through the Argonne Area Office. In addition, the Idaho Branch Office of the Pittsburgh Naval Reactors Office has responsibility for the Naval Reactor Facility (NRF) at the INEL. The assessment included all DOE elements having ongoing program activities at the site except for the NRF. In addition, the Safety and Health Subteam did not review the Westinghouse Idaho Nuclear Company, Inc. facilities and operations. The Tiger Team Assessment was conducted from June 17 to August 2, 1991, under the auspices of the Office of Special Projects, Office of the Assistant Secretary for Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing environmental, safety, and health (ES H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable federal, state, and local regulations; applicable DOE Orders; best management practices; and internal INEL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors management of ES H/quality assurance programs was conducted.

Not Available

1991-08-01T23:59:59.000Z

290

Distributing Planning and Control for Teams of Cooperating Mobile Robots  

SciTech Connect (OSTI)

This CRADA project involved the cooperative research of investigators in ORNL's Center for Engineering Science Advanced Research (CESAR) with researchers at Caterpillar, Inc. The subject of the research was the development of cooperative control strategies for autonomous vehicles performing applications of interest to Caterpillar customers. The project involved three Phases of research, conducted over the time period of November 1998 through December 2001. This project led to the successful development of several technologies and demonstrations in realistic simulation that illustrated the effectiveness of our control approaches for distributed planning and cooperation in multi-robot teams. The primary objectives of this research project were to: (1) Develop autonomous control technologies to enable multiple vehicles to work together cooperatively, (2) Provide the foundational capabilities for a human operator to exercise oversight and guidance during the multi-vehicle task execution, and (3) Integrate these capabilities to the ALLIANCE-based autonomous control approach for multi-robot teams. These objectives have been successfully met with the results implemented and demonstrated in a near real-time multi-vehicle simulation of up to four vehicles performing mission-relevant tasks.

Parker, L.E.

2004-07-19T23:59:59.000Z

291

The agreement will see Team McMillan underwrite production costs of the  

E-Print Network [OSTI]

a BMW from Team McMillan. All the reader is required to do is present a copy of the BMW advertisement OF MEDICAL AND HEALTH SCIENCES Team McMillan BMW and Mini supports the Liggins Continued on page 6 Artworks at the Liggins P A G E 5 One of Auckland's premiere car centres Team McMillan BMW and Mini has become

Auckland, University of

292

E-Print Network 3.0 - aerial monitoring team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

in SWAT Applications: Research, Design, and Operations Challenges Summary: ), the Palo Alto - Mountain View (California) Regional Special Weapons and Tactics (SWAT) team, and the...

293

E-Print Network 3.0 - academic team formation Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

forward completely plausible explanations... of teams and their formation. The works of Phillip Cohen and Hector Levesque have been very influential... and therefore will receive...

294

Innovative Energy-Saving Process Earns Jefferson Lab Team a 2007...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cryogenic Group Leader Dana Arenius, and team members Mathew Wright, Jonathan Creel, Kelly Dixon, Peter Knudsen and Venkatarao "Rao" Ganni. NEWPORT NEWS, VA, June 12, 2007 - A...

295

Federal Efficiency Program Wins GreenGov Dream Team Award | Department...  

Energy Savers [EERE]

Team Award February 12, 2015 - 11:53am Addthis Partnered with the Department of Transportation (DOT), EERE's Federal Energy Management Program (FEMP) won the GreenGov...

296

E-Print Network 3.0 - asdex upgrade team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... Overview of ASDEX Upgrade Results - Development of integrated operating...

297

Voluntary Protection Program Onsite Review, Legacy Management Support Team- January 2012  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Legacy Management Support Team is continuing to perform at a level deserving DOE-VPP Star recognition.

298

U.S. Scientific Team Draws on New Data, Multiple Scientific Methodolog...  

Office of Environmental Management (EM)

several scientific teams and is based on a combination of analyses of high resolution videos taken by ROVs, acoustic technologies, and measurements of oil collected by the oil...

299

25 People x 4 Days + 1 Manual = Team Belgiums E-Cube  

Broader source: Energy.gov [DOE]

No, it's not an Ikea manual; it's the instructions for how to construct Team Belgium's "E-Cube" home for the 2011 Solar Decathlon.

300

E-Print Network 3.0 - assembly teamed process Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

negotiated their roles in the design process, maintained the project... . In this process, the team members disseminated ideas or documents representing a proposed design...

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

WIPP Employee Inducted Into Mine Rescue Hall of Fame - WIPP Teams...  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Pilot Plant Blue Mine Rescue Team Captain Gary Kessler (right) receives an award from Neal Merrifield, administrator for the Mine Safety and Health Administration...

302

Building America Research Teams: BA-PIRC and IBACOS-Pioneers...  

Broader source: Energy.gov (indexed) [DOE]

This article continues our series of profiles about the Building America research teams-multidisciplinary industry partnerships that work to make high performance homes a reality...

303

PNNL 331 Building Arc Flash Team Investigation Report  

SciTech Connect (OSTI)

On Friday, April 21, 2006, a PNNL electrician was performing repair of an electrical system for the 331 Building chilled water pump (CHWP) No.2, when an electrical arc flash occurred inside a 480V combination motor starter. The electrician was taken to the on-site medical provider for evaluation and was released for return to work without restriction. The electrician was not shocked, but did receive a minor, superficial (first degree) burn on the left wrist. This report, the result of a thorough review by the 331 Building Arc Flash Assessment Team, provides an in-depth look at the steps leading up to the arc-flash and recommendations and opportunities for improvement.

Deichman, Mark L.; Drewrey, John C.; Hodges, Hurtis; Madson, Vernon J.; Minton, Allen L.; Montgomery, Daniel M.; Olson, Marvin E.; Rojas, Pedro H.; Sanan, Sanjay K.; Sharp, Reed D.; Sparks, Bobby R.; Swearingen, Gary L.

2006-06-06T23:59:59.000Z

304

Tiger Team assessment of the Sandia National Laboratories, Albuquerque  

SciTech Connect (OSTI)

This report documents the Tiger Team Assessment of Sandia National Laboratories (SNL), Albuquerque, located in Albuquerque, New Mexico. SNL, Albuquerque, is operated by the Sandia Corporation (a wholly owned subsidiary of the American Telephone and Telegraph Company) for the US Department of Energy (DOE). The environmental assessment also included DOE tenant facilities at Ross Aviation, Albuquerque Microelectronics Operation, and the Central Training Academy. The assessment was conducted from April 15 to May 24, 1991, under the auspices of DOE's Office of Special Projects under the Assistant Secretary for Environment, Safety and Health (ES H). The assessment was comprehensive, encompassing ES H disciplines, management, self-assessments, and quality assurance; transportation; and waste management operations. Compliance with applicable federal, state, and local regulations; applicable DOE Orders; best management practices; and internal SNL, Albuquerque, requirements were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and SNL, Albuquerque management of ES H programs was conducted.

Not Available

1991-05-01T23:59:59.000Z

305

Module Design, Materials, and Packaging Research Team: Activities and Capabilities  

SciTech Connect (OSTI)

Our team activities are directed at improving PV module reliability by incorporating new, more effective, and less expensive packaging materials and techniques. New and existing materials or designs are evaluated before and during accelerated environmental exposure for the following properties: (1) Adhesion and cohesion: peel strength and lap shear. (2) Electrical conductivity: surface, bulk, interface and transients. (3) Water vapor transmission: solubility and diffusivity. (4) Accelerated weathering: ultraviolet, temperature, and damp heat tests. (5) Module and cell failure diagnostics: infrared imaging, individual cell shunt characterization, coring. (6) Fabrication improvements: SiOxNy barrier coatings and enhanced wet adhesion. (7) Numerical modeling: Moisture ingress/egress, module and cell performance, and cell-to-frame leakage current. (8) Rheological properties of polymer encapsulant and sheeting materials. Specific examples will be described.

McMahon, T. J.; del Cueto, J.; Glick, S.; Jorgensen, G.; Kempe, M.; Kennedy, C.; Pern, J.; Terwilliger, K

2005-01-01T23:59:59.000Z

306

SHAPE-BASED SEQUENTIAL MACHINE ANALYSIS Andrew Crews, Forrest Brewer  

E-Print Network [OSTI]

. Design options including the potential for pipelining and/or locally regenerating critical signals can, construction of a machine in the form of a feedback shift-register is a simple case of a shape constraint such as wire delay and communication power dissipation or skew, dominate the design objectives. Such state

Brewer, Forrest D.

307

Two-page Curriculum vitae Forrest M. Hoffman  

E-Print Network [OSTI]

. Hoffman Computational Earth Sciences Group Oak Ridge National Laboratory (ORNL) Oak Ridge, Tennessee 37831 Ridge Natio* *nal Laboratory, Oak Ridge, Tennessee. January 2002 - October 2006: Contributing Editor

Hoffman, Forrest M.

308

A Time of Scary Opportunity Stephen R. Forrest  

E-Print Network [OSTI]

manufacturing, green energy, and health care and drug discovery are a few examples. Among these, advanced, the principal manufacturing hub of commodities in the U.S. ­ about 30% of manufactured goods are made here. But manufacturing is no longer the economic driver of the national economy that it once was. The centers

Shyy, Wei

309

Forrest S. Schultz, PhD Professor of Chemistry  

E-Print Network [OSTI]

to support programs in Nanoscience, Biotechnology, Computer and Electrical Engineering and Plastics with the Chemistry Department to most effectively meet the challenge of a growing demand for chemistry courses

Wu, Mingshen

310

Presented by Forrest M. Hoffman1, James T. Randerson2,  

E-Print Network [OSTI]

in the CCSM4 Earth System Model for use in the IPCC Fifth Assessment Report (AR5) · Unlike traditional MIPs, C

311

Symbolic Scheduling Techniques 1 Ivan Radivojevi c, Forrest Brewer  

E-Print Network [OSTI]

- constrained scheduling which allows speculative operation execution in arbitrary forward-branching control subject to data/control-flow dependencies and resource constraints. Priority- based heuristic scheduling on detection of mutual exclusiveness in control/data-flow graphs (CDFGs). Tree scheduling (TS) [8] uses a tree

Brewer, Forrest D.

312

Forrestal Garage Parking Guidelines, Revised August 12, 2010  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal7.pdfFlash_2010_-24.pdfOverviewPlans |Updated August 12, 2010

313

Forrestal Garage Parking Guidelines, Revised August 12, 2010 | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf Flash2006-14.pdfattachment.pdf6.pdf5.pdfFluorescentDepartment ofSummaryof Energy

314

Forrestal Building, 1000 Independence Avenue, S.W.,  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID4,2,"Alabama","Alabama","Electric PowerStocks Sep-14THURSDAY, APRIL 3,

315

Forrestal Building, 1000 Independence Avenue, S.W.,  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID4,2,"Alabama","Alabama","Electric PowerStocks Sep-14THURSDAY, APRIL

316

Labor-Management Roundtable Forrestal Building, Washington, DC  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't Happen to HighJosephNOx Traps forLM2 LNG Annualn d

317

5 Questions for a Scientist: Materials Engineer David Forrest | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South Valley ResponsibleSubmissionof Energy 5 Questions for a Scientist:

318

Forrest County, Mississippi: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf JumpFlixMapFile Jump to:

319

Forrest City, Arkansas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vsFlintFluxInput your

320

Forrestal Garage Parking Procedures, Revised August 12, 2010  

Broader source: Energy.gov (indexed) [DOE]

Application form may also be accessed electronically on the Office of Administration Web site located at http:management.energy.govapplicationprocess.htm....

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Locating RF Emitters with Large UAV Teams Paul Scerri, Robin Glinton, Sean Owens and Katia Sycara  

E-Print Network [OSTI]

Locating RF Emitters with Large UAV Teams Paul Scerri, Robin Glinton, Sean Owens and Katia Sycara efficient way for a team of UAVs with Received Signal Strength Indicator (RSSI) sen- sors to locate radio locations requires integrating multiple signals from different UAVs into a Bayesian filter, hence requir

Scerri, Paul

322

University of Exeter Site Manager Manual Creating links 1 University of Exeter Web Team, January 2012  

E-Print Network [OSTI]

University of Exeter Site Manager Manual Creating links 1 University of Exeter Web Team, January postgraduates' accommodation page.' Avoid using URLs for links in web page text. It is best practice to use of Exeter Site Manager Manual Creating links 2 University of Exeter Web Team, January 2012 Creating links

Bearhop, Stuart

323

LEAF Outreach Team Members Needed! Description: The Office of Sustainability seeks an intern to support  

E-Print Network [OSTI]

with public speaking, developing and giving presentations and facilitating trainings/workshops. Interns Outreach Team. You'll be working with a dedicated and knowledgeable team working to effect positive change: · Tabling at events like Earth Day, Stamp Fest, Maryland Day, and The Farmers Market at Maryland. · Running

Hill, Wendell T.

324

The Collegiate Wind Competition is Next Week: Meet the Teams Part II  

Office of Energy Efficiency and Renewable Energy (EERE)

Next week, 10 student teams representing colleges and universities across the country will compete in the Energy Departments first-ever Collegiate Wind Competition, which is designed to prepare talented young people for careers in the wind energy industry and enable academic institutions to showcase the ingenuity of their students. Meet five of these talented, creative teams.

325

2010MIT SOLAR ELECTRIC VEHICLE TEAM A MESSAGE FROM THE PRESIDENT  

E-Print Network [OSTI]

2010MIT SOLAR ELECTRIC VEHICLE TEAM #12;A MESSAGE FROM THE PRESIDENT President Hockfield poses with SEVT members at an outreach event ONE #12;The MIT Solar Electric Vehicle Team (SEVT) is a student electric vehicles through international participation and competition. Give our sponsors publicity through

326

COMMODITY CODE LISTING BY TEAM AND BUYER Rev. 05/28/14  

E-Print Network [OSTI]

-Constr/Fac-Aux (Tax Exempt) Construction Team 480.965.2217 / Buyer #17 701023C Cost of Sales-Services - Construction-Construction/Facilities Construction Team 480.965.0822 / Buyer #15 731049EV Elevator Service Matt Marino matthew 701023CA Cost of Sales-Services - Carpet/Windows Thomas Sassatelli Construction Manager 701023F Cost

Gerber, Leah R.

327

DRAFT: Mass Balance Team, part of Flow Rate Technical Group, Completes Estimate of Oil Flow  

E-Print Network [OSTI]

with the reservoir will also be addressed by integration with the MMS team and by incorporation of some degree) The Department of Energy (DOE) was asked to conduct a nodal analysis to estimate flow rates from reservoir to release points. This effort will rely on input from a research team coordinated by the Minerals Management

Fleskes, Joe

328

NatSci 390IH Team-oriented Lab Discovery in Renewable Energy Course Vision  

E-Print Network [OSTI]

NatSci 390IH ­ Team-oriented Lab Discovery in Renewable Energy [iCons 3E] Syllabus 3/13/2012 Course Vision This course involves student-driven, team-oriented laboratory projects focused on the interrelated by society. The iCons Energy Laboratory encompasses a four-week "energy bootcamp" followed by two

Auerbach, Scott M.

329

Passive liquid dispensing in capillary-based bio-adhesion Research teams Microfluidics Lab, GRASP (ULg)  

E-Print Network [OSTI]

Passive liquid dispensing in capillary-based bio-adhesion Research teams Microfluidics Lab, GRASP-81 (2010) #12;Coalescence strategies in droplet microfluidic systems Research team Microfluidics Lab, GRASP, mechanics) Droplet microfluidics is a new technology that aims at miniaturizing assays in life science (Lab

Wolper, Pierre

330

The Functionality of Focus: An Investigation into the Interactive Effects of Leader Focus and Team Interdependence  

E-Print Network [OSTI]

this issue, I introduce a multi-dimensional construct, called leader focus, to explain how leaders meet team needs by focusing their efforts on teamwork or taskwork (i.e., person-task focus) as well as different relational entities in the team (i.e., entity...

Harris, Thomas

2012-07-16T23:59:59.000Z

331

From Grid to private Clouds, to interClouds. Project Team  

E-Print Network [OSTI]

24/10/2011 1 From Grid to private Clouds, to interClouds. AlGorille Project Team An overviewGorille INRIA Project Team October 21, 2011 I Premise of Grid ComputingI Premise of Grid Computing... From Grid to private Clouds, to inter

Vialle, Stphane

332

New creative teams in priorities of scientific research is searching for suitable candidates for  

E-Print Network [OSTI]

New creative teams in priorities of scientific research The VSB is searching for suitable systems in energetics (5 postdoc positions; contact: A basic description of each specific project module i preparation of new joint research projects New creative teams in priorities of scientific research

Savicky, Petr

333

L Robots in a team are organized as a free market economy.  

E-Print Network [OSTI]

L Robots in a team are organized as a free market economy. L Team mission is best achieved when the economy maximizes production and minimizes costs. L Robots negotiate with each other to exchange money Speculation on colony needs Purchase Experiences Sell Refined Behaviors Computations Sent Colony Members

Gupta, Abhinav

334

My year in the FX Research team at HSBC Researching the largest financial market  

E-Print Network [OSTI]

My year in the FX Research team at HSBC Researching the largest financial market Ievgeniia Korotkova 2013/2014 ­ Department of Economics HSBC FX Research team... HSBC's FX research is repeatedly out how `the business world works'. HSBC is a global company so you will get to work and have regular

Burton, Geoffrey R.

335

IL/EBP EducatIon The team space clearly documents behaviors  

E-Print Network [OSTI]

IL/EBP EducatIon The team space clearly documents behaviors in the realm of practice-based learning clinical competency. team 2.0: a collaborative online method for knowledge management in academic medicine Authors: Lauren A. Maggio, MS (LIS), MA, AHIP; Keith A. Posley, MD, MS LANE KNOWLEDGE MANAGEMENT CENTER

Kay, Mark A.

336

Tiger Team assessment of the Brookhaven National Laboratory  

SciTech Connect (OSTI)

This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and internal BNL requirements was assessed. In addition, the assessment included an evaluation of the adequacy and effectiveness of the DOE and the site contractor, Associated Universities, Inc. (AUI), management, organization, and administration of the ES H programs at BNL. This volume contains appendices.

Not Available

1990-06-01T23:59:59.000Z

337

AmeriFlux Measurement Network: Science Team Research  

SciTech Connect (OSTI)

Research involves analysis and field direction of AmeriFlux operations, and the PI provides scientific leadership of the AmeriFlux network. Activities include the coordination and quality assurance of measurements across AmeriFlux network sites, synthesis of results across the network, organizing and supporting the annual Science Team Meeting, and communicating AmeriFlux results to the scientific community and other users. Objectives of measurement research include (i) coordination of flux and biometric measurement protocols (ii) timely data delivery to the Carbon Dioxide Information and Analysis Center (CDIAC); and (iii) assurance of data quality of flux and ecosystem measurements contributed by AmeriFlux sites. Objectives of integration and synthesis activities include (i) integration of site data into network-wide synthesis products; and (ii) participation in the analysis, modeling and interpretation of network data products. Communications objectives include (i) organizing an annual meeting of AmeriFlux investigators for reporting annual flux measurements and exchanging scientific information on ecosystem carbon budgets; (ii) developing focused topics for analysis and publication; and (iii) developing data reporting protocols in support of AmeriFlux network goals.

Law, B E

2012-12-12T23:59:59.000Z

338

SustSciTeam_ProgramSummary_051611.xlsx.5/16/11 1Q 2Q 3Q Summer  

E-Print Network [OSTI]

-month) Orientation and Team Building Year 1 Sustainability Science ESS280A (4units) Independent Research XXX299 (4 units) Independent Research XXX299 (4 units) Summer Salary Sustainability Science Course; Define Team Report; Progress mtgs. Sustainability Science Team - Summary Schedule Apply to Sustainability Science

Rose, Michael R.

339

Project Team German Drazer, Assistant Professor, Chemical & Biomolecular Engineering Department, Whiting School  

E-Print Network [OSTI]

Project Team German Drazer, Assistant Professor, Chemical & Biomolecular Engineering Department, Whiting School of Engineering; John Herrmann, Graduate Student, Chemical & Biomolecular Engineering and by Diffusive Processes with Flash Animation Audience Students in the undergraduate courses Transport Phenomena

Gray, Jeffrey J.

340

A Study of Student Design Team Behaviors in Complex System Design  

E-Print Network [OSTI]

Large-scale engineering systems require design teams to balance complex sets of considerations using a wide range of design and decision-making skills. Formal, computational approaches for optimizing complex systems offer ...

Honda, Tomonori

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

MIT Electric Vehicle Team Porsche designing a cooling system for the AC24 electric motor  

E-Print Network [OSTI]

In this thesis I worked on the design and analysis of a cooling system for the electric motor of the MIT Electric Vehicle Team's Porsche 914 Battery Electric Vehicle. The vehicle's Azure Dynamics AC24 motor tended to ...

Meenen, Jordan N

2010-01-01T23:59:59.000Z

342

Two PPPL-led teams win increased supercomputing time to study...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

physics and computation," said Chang, whose EPSI team is developing a high-performance computer code to simulate the edge of the plasma in donut-shaped fusion facilities called...

343

Operations manual for student-team-built hybrid power source to recharge an Unmanned Undersea Vehicle  

E-Print Network [OSTI]

Unmanned Undersea Vehicles (UUVs) have the potential to explore and monitor oceans in unprecedented ways, but their present batteries only allow them to operate for days at a time. A team of students designed and built a ...

Sue-Ho, Jonathan

2013-01-01T23:59:59.000Z

344

For Immediate Release --Tuesday, November 19, 2013 Successful University of Lethbridge iGEM team fundraiser  

E-Print Network [OSTI]

provides care to adults requiring help with substance abuse and problem gambling of Lethbridge iGEM team fundraiser supports South Country Treatment Centre Shortly), raised $2,500 for the South Country Treatment Centre. The sold out dinner, held

Seldin, Jonathan P.

345

La Cueva High School team takes top award in 24th New Mexico...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

24th New Mexico Supercomputing Challenge La Cueva High School team takes top award in 24th New Mexico Supercomputing Challenge Eli Echt-Wilson and Albert Zuo from La Cueva High in...

346

Training and exercises of the Emergency Response Team at the Los Alamos Plutonium Facility  

SciTech Connect (OSTI)

The Los Alamos National Laboratory Plutonium Facility has an active Emergency Response Team. The Emergency Response Team is composed of members of the operating and support groups within the Plutonium Facility. In addition to their initial indoctrination, the members are trained and certified in first-aid, CPR, fire and rescue, and the use of self-contained-breathing-apparatus. Training exercises, drills, are conducted once a month. The drills consist of scenarios which require the Emergency Response Team to apply CPR and/or first aid. The drills are performed in the Plutonium Facility, they are video taped, then reviewed and critiqued by site personnel. Through training and effective drills and the Emergency Response Team can efficiently respond to any credible accident which may occur at the Plutonium Facility. 3 tabs.

Yearwood, D.D.

1988-01-01T23:59:59.000Z

347

Lawrence Livermore Site Office Manager Joins EMs Senior Leadership Team  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. EM Acting Assistant Secretary Dave Huizenga announced today that Alice Williams, manager of the DOE National Nuclear Security Administration (NNSA) Lawrence Livermore Site Office has joined the EM senior leadership team.

348

JCESR and NASA team up to conduct research for next generation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

JCESR and NASA team up to conduct research for next generation batteries to be used in space adipex for sale News Release buy xanax online no prescription Media Contacts buy...

349

Team #32 Page 1 of 19 Modeling Toll Plaza Behavior Using Queuing Theory  

E-Print Network [OSTI]

.2 Environmental Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 4.3 Traffic Capacity and Graphs 18 #12;Team #32 Page 3 of 19 1 Introduction Toll financing has been used throughout the history

Morrow, James A.

350

Layered AI architecture for team based first person shooter video games  

E-Print Network [OSTI]

In this thesis an architecture, similar to subsumption architectures, is presented which uses low level behaviour modules, based on combinations of machine learning techniques, to create teams of autonomous agents ...

Graham, Philip Mike

2011-06-30T23:59:59.000Z

351

ORNL and DOE team stay ahead of the computing curve in monumental...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and one private-sector company on this long-term project, known as Accelerated Climate Modeling for Energy, or ACME. Many of the ORNL team members are also Climate Change...

352

Team California Wins the Communications Contest at U.S. Department...  

Office of Environmental Management (EM)

solar energy systems to the public. "Team California constructed an easy-to-navigate Web site with a user-friendly home page, which encourages further site exploration," said...

353

E-Print Network 3.0 - aviation-based team training Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

training for surgeons Summary: of aviation-based teamwork training on the attitudes of health-care professionals. J Am Coll Surg 199... team members do not all have the same...

354

E-Print Network 3.0 - architecture tiger team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: architecture tiger team Page: << < 1 2 3 4 5 > >> 1 iTiger @ Clemson iTiger Partnership Summary:...

355

E-Print Network 3.0 - architecture team-lunar scenario Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Search Powered by Explorit Topic List Advanced Search Sample search results for: architecture team-lunar scenario Page: << < 1 2 3 4 5 > >> 1 The goal of software architecture...

356

Leading for learning : behavioral, educational, and methodological perspectives on multicultural team learning processes  

E-Print Network [OSTI]

This study starts from the notion that leadership is about mobilizing learning, and simultaneously pursues multifaceted purposes that benefit from each other: 1) to shed new light on learning behaviors of teams facing ...

Kanehira, Naoto, S.M. Massachusetts Institute of Technology

2008-01-01T23:59:59.000Z

357

For Immediate Release --Monday, April 28, 2014 Architectural design team chosen for University of  

E-Print Network [OSTI]

in southern Alberta. An integrated design process that engages key stakeholdersFor Immediate Release -- Monday, April 28, 2014 Architectural design team chosen for University of Lethbridge's new science building and energy centre

Seldin, Jonathan P.

358

E-Print Network 3.0 - access team sri-cat Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Restoration Technologies 5 Version 10.0 Page 1 of 13 July 2007 StaffOnline User Guide Summary: Management folder gives managers access to basic details of their team...

359

NREL Team Creates High-Activity, Durable Platinum Extended Surface Catalyst for Fuel Cells (Fact Sheet)  

SciTech Connect (OSTI)

Researchers with NREL's Fuel Cell team showed that platinum can replace copper nanowires in such a way that high-surface-area and high-specific-activity catalysts are produced, potentially allowing for lower-cost catalysts.

Not Available

2011-02-01T23:59:59.000Z

360

Computational formulation, modeling and evaluation of human-robot team training techniques  

E-Print Network [OSTI]

This thesis is focused on designing mechanisms for programming robots and training people to perform human-robot collaborative tasks, drawing upon insights from practices widely used in human teams. First, we design and ...

Nikolaidis, Stefanos Z

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The Role of the Consequence Management Home Team in the Fukushima Daiichi Response  

SciTech Connect (OSTI)

The Consequence Management Home Team is a U.S. Department of Energy/National Nuclear Security Administration asset. It assists a variety of response organizations with modeling; radiological operations planning; field monitoring techniques; and the analysis, interpretation, and distribution of radiological data. These reach-back capabilities are activated quickly to support public safety and minimize the social and economic impact of a nuclear or radiological incident. In the Fukushima Daiichi response, the Consequence Management Home Team grew to include a more broad range of support than was historically planned. From the early days of the response to the continuing involvement in supporting late phase efforts, each stage of the Consequence Management Home Team support had distinct characteristics in terms of management of incoming data streams as well as creation of products. Regardless of stage, the Consequence Management Home Team played a critical role in the Fukushima Daiichi response effort.

Pemberton, W., Mena, R., Beal, W.

2012-05-01T23:59:59.000Z

362

Globally Distributed Engineering Teams in Computational Fluid Dynamics and in Product Development  

E-Print Network [OSTI]

, experimental research on idea generation methods used in globally distributed teams during the conceptual design phase of the product development process is presented. An experimental study simulating the global distribution of a three person Computational...

Schmidt, Susanne R.

2010-10-12T23:59:59.000Z

363

Concours Cayley Canada Canadian Team Honour Roll / Palmars des quipes l'chelle nationale  

E-Print Network [OSTI]

Concours Cayley ­ Canada Canadian Team Honour Roll / Palmarès des équipes à l'échelle nationale Cayley Contest ­ Canada 11 There were 1011 three-student teams. Il y avait 1011 équipes de trois élèves UPPER CANADA COLLEGE TORONTO ON 374 17 GLENFOREST S.S. MISSISSAUGA ON 373 18 LOWER CANADA COLLEGE

Le Roy, Robert J.

364

An Investigation of the Effect of After-Action Reviews on Teams' Performance-Efficacy Relationships  

E-Print Network [OSTI]

work has provided strong evidence that past performance is a better predictor of future performance than self-efficacy and that self- efficacy explains very little variance in future performance when examined longitudinally after controlling for past...?s assessment of its efficacy will be more congruent with its actual past performance of the task and as such, can be used more effectively by the team in allocating resources in pursuit of successful task performance. For example, a team that performs poorly...

Schurig, Ira

2012-07-16T23:59:59.000Z

365

Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition  

Broader source: Energy.gov [DOE]

Savannah River Site, Aiken, S.C. Security Protection Officers from Savannah River Sites (SRS) security contractor WSI-SRS, today won the Department of Energy (DOE) Secretarys Trophy as the top DOE team in the 2012 Security Protection Officer Team Competition (SPOTC)- 2012 Carolina Challenge, held here, April 22-26. It was the 40th anniversary of the SPOTC competition.

366

Systematic Approach to the Development, Evolution, and Effectiveness of Integrated Product Development Teams (IPDTs)  

SciTech Connect (OSTI)

Integrated Product Development Teams (IPDT) are a key component of any systems engineering (SE) application, but since they are formed primarily from technical considerations, many IPDTs are far less productive than they otherwise could be. By recognizing specific personality types and skill sets, a random group of 'technical' individuals can be structured to become a highly effective team capable of delivering much more than the sum of its members.

Margie Jeffs; R. Douglas Hamelin

2011-06-01T23:59:59.000Z

367

Facilities Initiatives | Department of Energy  

Office of Environmental Management (EM)

Central Chiller Plant Upgrade Forrestal Canopy LED Lighting Upgrade Forrestal Corridor Light Switching Forrestal Solar Array Steam Trap Replacement Forrestal West and South...

368

It Takes More Than a Cow Bell to Lead a Team  

SciTech Connect (OSTI)

Leading an audit team goes beyond performance of the duties outlined in any requirement or training course. Anyone can memorize the steps to begin and to complete an audit, but it takes leadership to capitalize on the strengths of each team member and to interact with the auditee. Leadership has been written about and studied for many years. Principles and ideas developed by Covey, Senge, Peters, Blanchard, Hersey, Drucker, Yuki and many, many more but they all come down to some basic issues. There is no magic formula. There are theories and models that when applied work in one situation. Some theories and methodologies work better than others depending on the situation. The presentation today looks at leadership from the perspective of the lead auditor, as he/she has to guide the audit process and deal with many personalities from the audit team to the people being interviewed, Each situation is different, each audit team is different, each audit is unique. The basic principles are applied but it takes understanding leadership to have a successful audit. Applying the Situational Leadership model will enable you to be a good and effective leader and capitalize on the strengths of each team member. It is an invaluable asset to add to your communication toolbox. So let's put our bells on the shelf and put on our learning caps.

Sickles, L.D.

1999-01-20T23:59:59.000Z

369

April 13 2011 Webinar: A Guide to Using AmeriCorps NCCC Teams to Execute Your Mission  

Broader source: Energy.gov [DOE]

April 13 2011 Webinar: A Guide to Using AmeriCorps NCCC Teams to Execute Your Mission; help with program implementating AmeriCorps National Civilian Community Corps.

370

When Sugar Turns to Sh%&: Immediate Action Decision Making and Resilience in High Reliability Teams  

E-Print Network [OSTI]

. Thank you for allowing this academic to invade your lives and get in the way. Your time and patience with me was amazing, and I hope that I have captured your work in these pages in a way that does you justice. Stay safe out there and come home... such practices are important, my interest is in how teams adapt within the moment, without withdrawing from the unfolding situation, and reestablish functionality after a critical disruption. Simply, how does the team respond in the moment to make sense...

Wesner, Bradley Scott

2012-02-14T23:59:59.000Z

371

Full design of a low-cost quadrotor UAV by student team  

E-Print Network [OSTI]

Full design of a low-cost quadrotor UAV by student team Jean-Baptiste Devaud#1 , Stéphane Najko.marzat@onera.fr Abstract-- This paper presents the complete design of a quadrotor UAV, named VORTEX, comprising its architecture and control. The use of Unmanned Aerial Vehicles (UAV) for surveillance, observation and security

Paris-Sud XI, Université de

372

Neil Armstrong UC Forward Innovation Award The award is given to a team of outstanding students  

E-Print Network [OSTI]

Neil Armstrong UC Forward Innovation Award The award is given to a team of outstanding students worked with them. Nominations for the Neil Armstrong UC Forward Innovation Award for Students must in solving problems. Neil Armstrong inspired generations of students to study STEM subjects to become

Papautsky, Ian

373

Proceedings of the third Atmospheric Radiation Measurement (ARM) science team meeting  

SciTech Connect (OSTI)

This document contains the summaries of papers presented at the 1993 Atmospheric Radiation Measurement (ARM) Science Team meeting held in Morman, Oklahoma. To put these papers in context, it is useful to consider the history and status of the ARM Program at the time of the meeting. Individual papers have been cataloged separately.

Not Available

1994-03-01T23:59:59.000Z

374

UNL Microgravity: Team Fast Project: Lunar soil is much different from terrestrial soil,  

E-Print Network [OSTI]

UNL Microgravity: Team Fast Project: Lunar soil is much different from terrestrial soil, consisting of a large percentage of very fine particles. Lunar soil also contains very irregular and jagged particles formed from the sintering together of broked grains during micro-meteorite bombardment. NASA has soil

Farritor, Shane

375

NPD Project leaders as team boundary spanners: Relational antecedents and performance outcomes  

E-Print Network [OSTI]

1 NPD Project leaders as team boundary spanners: Relational antecedents and performance outcomes S to the performance of NPD projects has been widely studied in the project management literature (Aronson et al., 2008, and many other important aspects of project management, project leaders' professional qualifications

Paris-Sud XI, Université de

376

A team effort: Reducing the volume of low-level radioactive waste  

SciTech Connect (OSTI)

This article describes the team effort at Entergy Operation`s River Bend Station in Louisiana to reduce the volume of low-level radioactive waste. Topic areas covered include the following: Assessment - waste composition analysis using EPRI guidelines; grassroots effort; release facility - managing the waste; emerging technologies; spreading the success. 4 fig.

Zimmermann, K.

1996-09-01T23:59:59.000Z

377

Maximizing Lifetime in an Energy Constrained Wireless Sensor Array Using Team Optimization  

E-Print Network [OSTI]

Maximizing Lifetime in an Energy Constrained Wireless Sensor Array Using Team Optimization of Cooperating Systems Robert J. Marks II, Arindam K. Das, Mohamed El-Sharkawi Department of Electrical trees to do this. For a known node constellation, the maximum lifetime of a single tree is equal

Arabshahi, Payman

378

Australia'smostendangered A team of eminent ecologists from Innovative Research Universities across Australia  

E-Print Network [OSTI]

Protecting Australia'smostendangered landscapes A team of eminent ecologists from Innovative Research Universities across Australia has identified the environments in our continent at greatest risk of catastrophic change ­ and what we can do to save them. #12;Protecting Australia's most endangered landscapes 1

379

Administrative Excellence Shaping Our Future Phase II Work Team Project Charter  

E-Print Network [OSTI]

team includes: · collecting and analyzing space data and reviewing current policies and operations, and provide guidance to AE and Huron on implementation strategies and necessary or desired policies; conduct; conduct additional analysis as required · Weeks 9 to 10 ­Finalize business case/implementation plan

Sheridan, Jennifer

380

Modeling and Quantification of Team Performance in Human Reliability Analysis for Probabilistic Risk Assessment  

SciTech Connect (OSTI)

Probabilistic Risk Assessment (PRA) and Human Reliability Assessment (HRA) are important technical contributors to the United States (U.S.) Nuclear Regulatory Commissions (NRC) risk-informed and performance based approach to regulating U.S. commercial nuclear activities. Furthermore, all currently operating commercial NPPs in the U.S. are required by federal regulation to be staffed with crews of operators. Yet, aspects of team performance are underspecified in most HRA methods that are widely used in the nuclear industry. There are a variety of "emergent" team cognition and teamwork errors (e.g., communication errors) that are 1) distinct from individual human errors, and 2) important to understand from a PRA perspective. The lack of robust models or quantification of team performance is an issue that affects the accuracy and validity of HRA methods and models, leading to significant uncertainty in estimating HEPs. This paper describes research that has the objective to model and quantify team dynamics and teamwork within NPP control room crews for risk informed applications, thereby improving the technical basis of HRA, which improves the risk-informed approach the NRC uses to regulate the U.S. commercial nuclear industry.

Jeffrey C. JOe; Ronald L. Boring

2014-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

RENEWABLE ENERGY ACTION TEAM Milestones to Permit California Renewable Portfolio Standard Energy Projects  

E-Print Network [OSTI]

renewable energy resources. In November 2008, the CEC, DFG, the Bureau of Land Management (BLM1 RENEWABLE ENERGY ACTION TEAM Milestones to Permit California Renewable Portfolio Standard Energy on November 17, 2008, requiring 33 percent of the electricity sold in California to come from renewable

382

Research, scholarship and creative activity at Oklahoma State University 2010 OSU research team  

E-Print Network [OSTI]

, statisticians and hyperbaric medicine experts involved in the study are evaluating autism from several different&A section, tackling questions about our state's economic outlook and how universities can play a role researchers, a multidisciplinary team world renowned for their study of ticks and tick-borne diseases. OSU

Veiga, Pedro Manuel Barbosa

383

Evaluating the Applicability of Current Models of Workload to Peer-based Human-robot Teams  

E-Print Network [OSTI]

-off possibility into a reality. Human Performance Moderator Functions (HPMFs) can be used to predict human. This trend was predicted by the IMPRINT Pro models. These results are the first to indicate that existing Terms Performance, Experimentation, Human Factors Keywords human-robot peer-based teams, human-performance

Zhang, Tao

384

Visualizing the Brain in a New Way USTAR Research Team #7: Imaging Technology  

E-Print Network [OSTI]

Visualizing the Brain in a New Way USTAR Research Team #7: Imaging Technology Learning to spot autism by creating models of healthy brains How do you know if you're looking at something unhealthy Gerig to study the development of brains in children from infancy to four-years-old. Using magnetic

Utah, University of

385

COSPAR Roadmap team v. 2014/07/281 Advancing space weather science to protect  

E-Print Network [OSTI]

COSPAR Roadmap team v. 2014/07/281 Advancing space weather science to protect society's technological infrastructure: a COSPAR/ILWS roadmap Advancing space weather science to protect society's technological infrastructure: a COSPAR/ILWS roadmap · Alan Aylward; University College London, UK · Sarah Gibson

Schrijver, Karel

386

Heavy Section Steel Technology HSST eLib Computational Structural Fracture Mechanics Team  

E-Print Network [OSTI]

Heavy Section Steel Technology ­ HSST eLib Computational Structural Fracture Mechanics Team the reports generated by the Heavy-Section Steel Technology (HSST) program (JCN B0119) from the early 1970's welcome the opportunity to discuss your potential applications and ways that the Heavy-Section Steel

387

CREATION OF A STRATEGIC PROJECTS TEAM AT THE UNIVERSITY OF SASKATCHEWAN  

E-Print Network [OSTI]

1 DRAFT CREATION OF A STRATEGIC PROJECTS TEAM AT THE UNIVERSITY OF SASKATCHEWAN Office of the Vice-President Research 3 March 2008 Introduction The University of Saskatchewan (U of S) strives to achieve excellence, and application of knowledge (Renewing the Dream: University of Saskatchewan Strategic Directions (2002

Patterson, William P.

388

U.S. Industrial Team DED-1 5/18/2001FIRE Plasma Facing Components  

E-Print Network [OSTI]

elements for high heat flux outer target q Swirl tape or helical wire inserts for CHF enhancement q Dome-like construction for lower heat flux baffle q Passively-cooled W-Cu tiles for low heat flux inner target q Modular units for remote maintenance during operation #12;U.S. Industrial Team DED-3 5/18/2001FIRE Plasma Facing

389

www.adminexcellence.wisc.edu Status of Administrative Excellence Work Teams  

E-Print Network [OSTI]

teams): April 26 Strategic Purchasing ­ Office Supplies: Recommendations were endorsed by the Advisory Committee and approved by the Steering Committee. April 26 Strategic Purchasing ­ Computer Bundles Purchasing ­ MRO Supplies: Recommendations were endorsed by the Advisory Committee and approved

Thiffeault, Jean-Luc

390

Research Team Integration: What It Is and Why It Matters Aruna D. Balakrishnan1  

E-Print Network [OSTI]

, Jonathon N. Cummings2 , Reza Zadeh3 1 Human-Computer Interaction Institute 3 Language Technology Institute diverse perspectives and expertise into new knowledge, methods, and products. However, integration integration. Implications for policy choices and design include changes in team structuring and technology

Mankoff, Jennifer

391

USCAR FUEL CELL TECH TEAM CELL COMPONENT ACCELERATED STRESS TEST PROTOCOLS  

E-Print Network [OSTI]

USCAR FUEL CELL TECH TEAM CELL COMPONENT ACCELERATED STRESS TEST PROTOCOLS FOR PEM FUEL CELLS of polymer electrolyte membrane (PEM) fuel cell components under simulated automotive drive cycle conditions of PEM fuel cells. Corrosion of high-surface area carbon supports poses significant concerns at high

392

SASE FEL at the TESLA Facility, Phase 2 The TESLA Test Facility FEL team  

E-Print Network [OSTI]

SASE FEL at the TESLA Facility, Phase 2 The TESLA Test Facility FEL team June 2002, TESLA-FEL 2002-01 #12;SASE FEL at the TESLA Facility, Phase 2 Abstract The last description of the TESLA Test Facility FEL has been written in 1995 (TESLA- FEL report 95-03). Since then, many changes have developed

393

SML Corporate and Executive Team +44(0) 131 451 3284/3843  

E-Print Network [OSTI]

SML Corporate and Executive Team +44(0) 131 451 3284/3843 smlcpd@hw.ac.uk Lean Six Sigma Lean Six performance as well as improve productivity and customer satisfaction. Lean Six Sigma is recognised as a world report published by the isixsigma professional body, Six Sigma has saved Fortune500companiesinthelast20

Painter, Kevin

394

http://agbioresearch.msu.edu/centers/nwmihort/ MSU Fruit Team Apple Maturity Report 2014  

E-Print Network [OSTI]

http://agbioresearch.msu.edu/centers/nwmihort/ MSU Fruit Team Apple Maturity Report 2014 Northwest Gingergold harvest continues, and many growers are waiting on McIntosh harvest to begin. Apples are coloring nicely with the cool temperatures. Cool temperatures have hit the northwest region, and apple maturity

395

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 3  

E-Print Network [OSTI]

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 3 September 18, 2013 Nikki Rothwell and Emily Pochubay, Extension Fruit Educators This is the third week of 2013 apple maturity testing at NWMHRC. General Comments - The NWMHRC will be testing apples for maturity for 2013

396

MSU Fruit Team Apple Maturity Report 2014 Northwest Region, Report Number 4: October 1, 2014  

E-Print Network [OSTI]

MSU Fruit Team Apple Maturity Report 2014 Northwest Region, Report Number 4: October 1, 2014 Emily Pochubay and Nikki Rothwell, Extension Fruit Educators Apples are maturing slowly, growers are spot picking-pruned orchards has excellent color. Size in most varieties is also very good; some Honeycrisp apples that had

397

Apple Tree, NH Big Tree for May By Anne Krantz, NH Big Tree Team,  

E-Print Network [OSTI]

Apple Tree, NH Big Tree for May By Anne Krantz, NH Big Tree Team, UNH Cooperative Extension The explosion of apple blossoms in May transforms the most gnarled old tree into a delicate cloud of beauty (1817-1862) in his essay "The Wild Apple Tree," described the blossoms perfectly: `The flowers

New Hampshire, University of

398

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 6: October 9, 2013  

E-Print Network [OSTI]

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 6: October 9, 2013 Nikki Rothwell and Emily Pochubay, Extension Fruit Educators This is the sixth week of 2013 apple maturity testing at NWMHRC. Results will be sent via fax and email to past apple maturity list subscribers. Results

399

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 1  

E-Print Network [OSTI]

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 1 September 4, 2013 General Comments - The NWMHRC will be testing apples for maturity for 2013, and results will be sent via fax and email to past apple maturity list subscribers. Results will also be available at: http

400

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 7: October 16, 2013  

E-Print Network [OSTI]

MSU Fruit Team Apple Maturity Report 2013 Northwest Region, Report Number 7: October 16, 2013 Nikki Rothwell and Emily Pochubay, Extension Fruit Educators This is the seventh week of 2013 apple maturity testing at NWMHRC. Results will be sent via fax and email to past apple maturity list subscribers. Results

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Integrated Project Teams Guide for Use with DOE O 413. 3A  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide provides those responsible for program and project management with the information and perspective needed to successfully implement the requirements of DOE O 413.3A relating to the use of integrated project teams to achieve improved project outcomes and efficiency.

2008-09-24T23:59:59.000Z

402

Sneak peek at electrofuels: Geobacter team aims for bio-based solution to solar energy storage  

E-Print Network [OSTI]

Sneak peek at electrofuels: Geobacter team aims for bio-based solution to solar energy storage a hybrid of solar and bio-power and also solve the most perplexing problem facing solar energy: energy compounds, and oxygen is released as a byproduct," Lovley explains. Solar energy powers the microbes

Lovley, Derek

403

Building Applications Team Dale Sartor 510.486.5988 DASartor@lbl.gov  

E-Print Network [OSTI]

Building Applications Team Dale Sartor 510.486.5988 ·· DASartor@lbl.gov http://ateam.lbl.gov The A advanced energy- efficient tech-nology and indoor environ-mental quality concepts in buildings both buildings. An important area of expertise is assistance with performance contracting for energy

404

CMDragons 2009 Extended Team Description Stefan Zickler, James Bruce, Joydeep Biswas,  

E-Print Network [OSTI]

of this paper describes the robot and vision hardware of the system. The second half of this paper describes resolution to accurately localize the robots and the ball on the relatively large field. This Section describes these hardware components of our system. 2.1 Vision In previous years, the CMDragons team has

Veloso, Manuela M.

405

Environmental Response Team Standard Operating Procedures for Contaminated Water Diving Operations  

E-Print Network [OSTI]

Dilution of Contaminants ·· Small Closed Body of WaterSmall Closed Body of Water ·· Pond or Flooded QuarryPond or FloodedEnvironmental Response Team Standard Operating Procedures for Contaminated Water Diving Operations for Contaminated Water Diving OperationsProcedures for Contaminated Water Diving Operations AAUS March 2010 Meeting

Sura, Philip

406

iPTF/ZTF Image Differencing & Extraction Frank Masci & the iPTF/ZTF Team  

E-Print Network [OSTI]

1 iPTF/ZTF Image Differencing & Extraction Frank Masci & the iPTF/ZTF Team LSST - ZTF joint meeting...) · Difference imaging: discover transients by suppressing everything that's static in space and time · Given to streamline/ease vetting process downstream ? optimal: maximizes signal-to-noise of detected candidates ?

Masci, Frank

407

1st MORE TEAM MEETING Roma, 26-27 February 2007  

E-Print Network [OSTI]

1st MORE TEAM MEETING Roma, 26-27 February 2007 THE BEPICOLOMBO ORBIT DETERMINATION PROBLEM processed high resolution camera images (repeated on the same area of the surface) and S/C attitude data of the spherical harmonics of the gravity field of Mercury, static part; of degrees from 2 to at least 25 (possibly

Milani, Andrea

408

Collaborative Systems Thinking: Towards an Understanding of Team-level Systems Thinking  

E-Print Network [OSTI]

Paper #207 Collaborative Systems Thinking: Towards an Understanding of Team-level Systems Thinking than are younger engineers developing the skills. Systems thinking is one such skill. Recent research, (Davidz 2006), has shown the importance of experiential learning in systems thinking skill development

de Weck, Olivier L.

409

Asclepios: a Research Project-Team at INRIA for the Analysis and Simulation of Biomedical  

E-Print Network [OSTI]

Asclepios: a Research Project-Team at INRIA for the Analysis and Simulation of Biomedical Images N objectives are described and illustrated in this article. 1 Introduction 1.1 The revolution of biomedical is supported by a continually increasing number of biomedical devices providing in vivo measurements

Paris-Sud XI, Université de

410

Cooperative Real-Time Search and Task Allocation in UAV Teams Yan Jin, Ali A. Minai, Marios M. Polycarpou  

E-Print Network [OSTI]

Cooperative Real-Time Search and Task Allocation in UAV Teams Yan Jin, Ali A. Minai, Marios M consider a heterogeneous team of UAVs drawn from several distinct classes and engaged in a search unknown. During the mission, the UAVs perform Search, Confirm, Attack and Battle Damage Assessment (BDA

Minai, Ali A.

411

TheCMUnited-98ChampionSmall-RobotTeam Manuela Veloso, Michael Bowling, Sorin Achim, Kwun Han, and Peter Stone  

E-Print Network [OSTI]

of our champion CMUnited-98 small robot team. The team is a multi- agent robotic system with global. The complete system is fully autonomous consisting of a well-de ned and challenging processing cycle of each robot and the ball. This information is sent to an o -board controller and distributed to the di

Stone, Peter

412

The CMUnited98 Champion SmallRobot Team Manuela Veloso, Michael Bowling, Sorin Achim, Kwun Han, and Peter Stone  

E-Print Network [OSTI]

of our champion CMUnited­98 small robot team. The team is a multi­ agent robotic system with global and distributed reaction. The complete system is fully autonomous consisting of a well­defined and challenging, giving the positions of each robot and the ball. This information is sent to an off­board controller

Stone, Peter

413

ARMO: Adaptive Road Map Optimization for Large Robot Teams Alexander Kleiner*, Dali Sun* and Daniel Meyer-Delius*  

E-Print Network [OSTI]

in static environments [4] that compute during a pre-processing phase a connectivity graph in freeARMO: Adaptive Road Map Optimization for Large Robot Teams Alexander Kleiner*, Dali Sun* and Daniel Meyer-Delius* Abstract-- Autonomous robot teams that simultaneously dis- patch transportation tasks

Nebel, Bernhard

414

Production Specialist mFoundry needs a talented Production Specialist to work on our product development team. The  

E-Print Network [OSTI]

and research for new or complementary products areas. Support the sales and client services teams throughProduction Specialist mFoundry needs a talented Production Specialist to work on our product development team. The Mobile Production Specialist is responsible for providing graphic and technical

Ravikumar, B.

415

Making contracting work better and cost less: Report of the Contract Reform Team  

SciTech Connect (OSTI)

In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

Not Available

1994-02-01T23:59:59.000Z

416

Innovative nuclear thermal propulsion technology evaluation: Results of the NASA/DOE Task Team study  

SciTech Connect (OSTI)

In response to findings from two NASA/DOE nuclear propulsion workshops held in the summer of 1990, six task teams were formed to continue evaluation of various nuclear propulsion concepts. The Task Team on Nuclear Thermal Propulsion (NTP) created the Innovative Concepts Subpanel to evaluate thermal propulsion concepts which did not utilize solid fuel. The Subpanel endeavored to evaluate each of the concepts on a level technological playing field,'' and to identify critical technologies, issues, and early proof-of-concept experiments. The concepts included the liquid core fission, the gas core fission, the fission foil reactors, explosively driven systems, fusion, and antimatter. The results of the studies by the panel will be provided. 13 refs., 6 figs., 2 tabs.

Howe, S. (Los Alamos National Lab., NM (United States)); Borowski, S. (National Aeronautics and Space Administration, Cleveland, OH (United States). Lewis Research Center); Motloch, C. (EG and G Idaho, Inc., Idaho Falls, ID (United States)); Helms, I. (Nuclear Utility Services, Damascus, MD (United States)); Diaz, N.; Anghaie, S. (Florida Univ., Gainesville, FL (United States)); Latham, T. (United

1991-01-01T23:59:59.000Z

417

Concours Fermat Canada Canadian Team Honour Roll / Palmars des quipes l'chelle nationale  

E-Print Network [OSTI]

Concours Fermat ­ Canada Canadian Team Honour Roll / Palmarès des équipes à l'échelle nationale Fermat Contest ­ Canada Rank / Position 53 - 97 100 - 193 203 - 292 302 - 397 410 - 496 509 - 591 603 CHURCHILL H.S. CALGARY AB 381 9 WESTERN CANADA H.S. CALGARY AB 380 10 EARL HAIG S.S. NORTH YORK ON 377

Le Roy, Robert J.

418

NASA technology applications team. Applications of aerospace technology. Annual Report, Oct. 1990 - Sep. 1991  

SciTech Connect (OSTI)

Discussed here are the activities of the Research Triangle Institute (RTI) Technology Applications Team for the period 1 October 1990 through 30 September 1991. Topics researched include automated data acquisition and analysis of highway pavement cracking, thermal insulation for refrigerators, the containment of paint removed from steel structures, improved technologies for Kuwait oil well control, sprayed zinc coatings for corrosion control of reinforcing steel in bridges, and the monitoring and life support of medically fragile children in the educational setting.

Not Available

1991-01-01T23:59:59.000Z

419

ESS280A_2012_011113.xlsx.1/11/13 2012 Sustainability Science Team  

E-Print Network [OSTI]

ESS280A_2012_011113.xlsx.1/11/13 2012 Sustainability Science Team Topics in Sustainability Science, ESS 280A Time Topic Faculty 10/1/12 Monday 11:00-12:30 Water Resources J. Famiglietti, ESS/CEE 10:00-12:30 Climate Change Science (Overview) M. Prather, ESS, EI 10/11/12 Thursday 12:30-2:00 Environmental Biology

Rose, Michael R.

420

Prospecting for lunar ice using a multi-rover cooperative team  

SciTech Connect (OSTI)

A multi-rover cooperative team or swarm developed by Sandia National Laboratories is described, including various control methodologies that have been implemented to date. How the swarm's capabilities could be applied to a lunar ice prospecting mission is briefly explored. Some of the specific major engineering issues that must be addressed to successfully implement the swarm approach to a lunar surface mission are outlined, and potential solutions are proposed.

KLARER,PAUL R.; FEDDEMA,JOHN T.; LEWIS,CHRISTOPHER L.

2000-02-11T23:59:59.000Z

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Report of the US Department of Energy's team analyses of the Chernobyl-4 Atomic Energy Station accident sequence  

SciTech Connect (OSTI)

In an effort to better understand the Chernobyl-4 accident of April 26, 1986, the US Department of Energy (DOE) formed a team of experts from the National Laboratories including Argonne National Laboratory, Brookhaven National Laboratory, Oak Ridge National Laboratory, and Pacific Northwest Laboratory. The DOE Team provided the analytical support to the US delegation for the August meeting of the International Atomic Energy Agency (IAEA), and to subsequent international meetings. The DOE Team has analyzed the accident in detail, assessed the plausibility and completeness of the information provided by the Soviets, and performed studies relevant to understanding the accident. The results of these studies are presented in this report.

Not Available

1986-11-01T23:59:59.000Z

422

Modeling the Office of Science Ten Year FacilitiesPlan: The PERI Architecture Tiger Team  

SciTech Connect (OSTI)

The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort to the optimization of key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance of these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.

de Supinski, B R; Alam, S R; Bailey, D H; Carrington, L; Daley, C

2009-05-27T23:59:59.000Z

423

Faculty and Student Teams and National Laboratories: Expanding the Reach of Research Opportunities and Workforce Development  

SciTech Connect (OSTI)

The Faculty and Student Teams (FaST) Program, a cooperative effort between the US Department of Energy (DOE) Office of Science and the National Science Foundation (NSF), brings together collaborative research teams composed of a researcher at Brookhaven National Laboratory, and a faculty member with two or three undergraduate students from a college or university. Begun by the Department of Energy in 2000 with the primary goal of building research capacity at a faculty member's home institution, the FaST Program focuses its recruiting efforts on faculty from colleges and universities with limited research facilities and those institutions that serve populations under-represented in the fields of science, engineering and technology, particularly women and minorities. Once assembled, a FaST team spends a summer engaged in hands-on research working alongside a laboratory scientist. This intensely collaborative environment fosters sustainable relationships between the faulty members and BNL that allow faculty members and their BNL colleagues to submit joint proposals to federal agencies, publish papers in peer-reviewed journals, reform local curriculum, and develop new or expand existing research labs at their home institutions.

Blackburn,N.; White, K.; Stegman, M.

2009-08-05T23:59:59.000Z

424

Tiger Team Assessment of the Navel Petroleum and Oil Shale Reserves Colorado, Utah, and Wyoming  

SciTech Connect (OSTI)

This report documents the Tiger Team Assessment of the Naval Petroleum Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW). NPOSR-CUW consists of Naval Petroleum Reserve Number 3 located near Casper, Wyoming; Naval Oil Shale Reserve Number I and Naval Oil Shale Reserve Number 3 located near Rifle, Colorado; and Naval Oil Shale Reserve Number 2 located near Vernal, Utah, which was not examined as part of this assessment. The assessment was comprehensive, encompassing environment, safety, and health (ES H) and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal NPOSR-CUW requirements was assessed. The NPOSR-CUW Tiger Team Assessment is part of a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and contractor ES H management programs, response actions to address the identified problem areas, and DOE-wide ES H compliance trends and root causes.

Not Available

1992-07-01T23:59:59.000Z

425

Team INL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Working with INL Community Outreach Visitor Information Calendar of Events ATR National Scientific User Facility Center for Advanced Energy Studies Light Water Reactor...

426

ORAU Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the ContributionsArms Control R&DNuclear fuelOPTICS FOR A PHOTOINJECTED

427

Leadership Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocs spaceLaser The SRS Community ReuseLeadershipLab

428

External Peer Review Team Report Underground Testing Area Subproject for Frenchman Flat, Revision 1  

SciTech Connect (OSTI)

An external peer review was conducted to review the groundwater models used in the corrective action investigation stage of the Underground Test Area (UGTA) subproject to forecast zones of potential contamination in 1,000 years for the Frenchman Flat area. The goal of the external peer review was to provide technical evaluation of the studies and to assist in assessing the readiness of the UGTA subproject to progress to monitoring activities for further model evaluation. The external peer review team consisted of six independent technical experts with expertise in geology, hydrogeology,'''groundwater modeling, and radiochemistry. The peer review team was tasked with addressing the following questions: 1. Are the modeling approaches, assumptions, and model results for Frenchman Flat consistent with the use of modeling studies as a decision tool for resolution of environmental and regulatory requirements? 2. Do the modeling results adequately account for uncertainty in models of flow and transport in the Frenchman Flat hydrological setting? a. Are the models of sufficient scale/resolution to adequately predict contaminant transport in the Frenchman Flat setting? b. Have all key processes been included in the model? c. Are the methods used to forecast contaminant boundaries from the transport modeling studies reasonable and appropriate? d. Are the assessments of uncertainty technically sound and consistent with state-of-the-art approaches currently used in the hydrological sciences? 3. Are the datasets and modeling results adequate for a transition to Corrective Action Unit monitoring studiesthe next stage in the UGTA strategy for Frenchman Flat? The peer review team is of the opinion that, with some limitations, the modeling approaches, assumptions, and model results are consistent with the use of modeling studies for resolution of environmental and regulatory requirements. The peer review team further finds that the modeling studies have accounted for uncertainty in models of flow and transport in the Frenchman Flat except for a few deficiencies described in the report. Finally, the peer review team concludes that the UGTA subproject has explored a wide range of variations in assumptions, methods, and data, and should proceed to the next stage with an emphasis on monitoring studies. The corrective action strategy, as described in the Federal Facility Agreement and Consent Order, states that the groundwater flow and transport models for each corrective action unit will consider, at a minimum, the following: Alternative hydrostratigraphic framework models of the modeling domain. Uncertainty in the radiological and hydrological source terms. Alternative models of recharge. Alternative boundary conditions and groundwater flows. Multiple permissive sets of calibrated flow models. Probabilistic simulations of transport using plausible sets of alternative framework and recharge models, and boundary and groundwater flows from calibrated flow models. Ensembles of forecasts of contaminant boundaries. Sensitivity and uncertainty analyses of model outputs. The peer review team finds that these minimum requirements have been met. While the groundwater modeling and uncertainty analyses have been quite detailed, the peer review team has identified several modeling-related issues that should be addressed in the next phase of the corrective action activities: Evaluating and using water-level gradients from the pilot wells at the Area 5 Radioactive Waste Management Site in model calibration. Re-evaluating the use of geochemical age-dating data to constrain model calibrations. Developing water budgets for the alluvial and upper volcanic aquifer systems in Frenchman Flat. Considering modeling approaches in which calculated groundwater flow directions near the water table are not predetermined by model boundary conditions and areas of recharge, all of which are very uncertain. Evaluating local-scale variations in hydraulic conductivity on the calculated contaminant boundaries. Evaluat

Sam Marutzky

2010-09-01T23:59:59.000Z

429

CSCI 4168 Project Proposal Objectives: To form a development team, develop a game concept and plan its design  

E-Print Network [OSTI]

of project team members. You should build some (not all) of the models in SketchUp, or another program are getting things done 3D modeling in Google SketchUp, etc In-Class Presentation Programming o GUI

Brooks, Stephen

430

The Effects of Class-Wide Function-related Intervention Teams (CW-FIT) on Students' Prosocial Classroom Behaviors  

E-Print Network [OSTI]

Students with challenging, disruptive behavior have difficulty learning in school and their behavior adversely impacts the learning of other students and the classroom teacher. Class-Wide Function-related Intervention Teams (CW-FIT) is a promising...

Conklin, Carl George

2010-04-26T23:59:59.000Z

431

Towards Collaborative Task and Team Maintenance Gal A. Kaminka Ari Yakir Dan Erusalimchik Nirom Cohen-Nov  

E-Print Network [OSTI]

is integrated and evaluated in two teamwork architectures for situated agent teams: DIESEL , an implemented are not made or distributed for profit or commercial advantage and that copies bear this notice and the full

Kaminka, Gal A.

432

The Comparative Effectiveness of After-Action Review in Co-located and Distributed Team Training Environments  

E-Print Network [OSTI]

to determine the generalizability of these findings to other tasks, domains, team types, and levels of expertise. v DEDICATION I would like to dedicate this dissertation and my entire graduate work to my parents who showed me the value...

Jarrett, Steven

2012-10-19T23:59:59.000Z

433

Human-robot cross-training: Computational formulation, modeling and evaluation of a human team training strategy  

E-Print Network [OSTI]

We design and evaluate human-robot cross-training, a strategy widely used and validated for effective human team training. Cross-training is an interactive planning method in which a human and a robot iteratively switch ...

Nikolaidis, Stefanos

434

Instrumentation Team US Team Members  

E-Print Network [OSTI]

3769 4240 4711 5182 5653 6124 6595 7066 7537 8008 8479 8950 9421 9892 0363 0834 1305 1776 2247 2718 3769 4240 4711 5182 5653 6124 6595 7066 7537 8008 8479 8950 9421 9892 10363 10834 11305 11776 12247

Grether, Gregory

435

Female Team Overall Name Age Rank Time Rank Time Rank Time Pace Rank Time Rank Time Pace Time  

E-Print Network [OSTI]

Female Team Overall Name Age Rank Time Rank Time Rank Time Pace Rank Time Rank Time Pace Time 1 Amy:56:27.6 Deborah Mc Eligot Deborah Storrings Male Team Overall Name Age Rank Time Rank Time Rank Time Pace Rank Time Rank Time Pace Time 1 Macon Fessenden 20 1 5:42.2 2 0:26.9 1 34:29.7 3:23 1 0:12.8 1 17:41.1 3

Suzuki, Masatsugu

436

Exploration and Resource Assessment at Mountain Home Air Force Base, Idaho Using an Integrated Team Approach  

SciTech Connect (OSTI)

The U.S. Air Force is facing a number of challenges as it moves into the future, one of the biggest being how to provide safe and secure energy to support base operations. A team of scientists and engineers met at Mountain Home Air Force Base near Boise, Idaho, to discuss the possibility of exploring for geothermal resources under the base. The team identified that there was a reasonable potential for geothermal resources based on data from an existing well. In addition, a regional gravity map helped identify several possible locations for drilling a new well. The team identified several possible sources of funding for this wellthe most logical being to use U.S. Department of Energy funds to drill the upper half of the well and U.S. Air Force funds to drill the bottom half of the well. The well was designed as a slimhole well in accordance with State of Idaho Department of Water Resources rules and regulations. Drilling operations commenced at the Mountain Home site in July of 2011 and were completed in January of 2012. Temperatures increased gradually, especially below a depth of 2000 ft. Temperatures increased more rapidly below a depth of 5500 ft. The bottom of the well is at 5976 ft, where a temperature of about 140C was recorded. The well flowed artesian from a depth below 5600 ft, until it was plugged off with drilling mud. Core samples were collected from the well and are being analyzed to help understand permeability at depth. Additional tests using a televiewer system will be run to evaluate orientation and directions at fractures, especially in the production zone. A final report on the well exploitation will be forthcoming later this year. The Air Force will use it to evaluate the geothermal resource potential for future private development options at Mountain Home AFB.

Joseph C. Armstrong; Robert P. Breckenridge; Dennis L. Nielson; John W. Shervais; Thomas R. Wood

2012-10-01T23:59:59.000Z

437

FY-12 INL KR CAPTURE ACTIVITIES SUPPORTING THE OFF-GAS SIGMA TEAM  

SciTech Connect (OSTI)

Tasks performed this year by INL Kr capture off-gas team members can be segregated into three separate task sub-sections which include: 1) The development and testing of a new engineered form sorbent, 2) An initial NDA gamma scan effort performed on the drum containing the Legacy Kr-85 sample materials, and 3) Collaborative research efforts with PNNL involving the testing of the Ni-DOBDC MOF and an initial attempt to make powdered chalcogel material into an engineered form using our binding process. This document describes the routes to success for the three task sub-sections.

Troy G. Garn; Mitchell R. Greenhalgh; Jack D Law

2012-08-01T23:59:59.000Z

438

Technical Advisory Team (TAT) report on the rocket sled test accident of October 9, 2008.  

SciTech Connect (OSTI)

This report summarizes probable causes and contributing factors that led to a rocket motor initiating prematurely while employees were preparing instrumentation for an AIII rocket sled test at SNL/NM, resulting in a Type-B Accident. Originally prepared by the Technical Advisory Team that provided technical assistance to the NNSA's Accident Investigation Board, the report includes analyses of several proposed causes and concludes that the most probable source of power for premature initiation of the rocket motor was the independent battery contained in the HiCap recorder package. The report includes data, evidence, and proposed scenarios to substantiate the analyses.

Stofleth, Jerome H.; Dinallo, Michael Anthony; Medina, Anthony J.

2009-01-01T23:59:59.000Z

439

Team UT-Battelle: Want to know more | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security AdministrationcontrollerNanocrystallineForeign ObjectOUR8, 2013Battelle: How to start a project IfTeam

440

Melrose High trio named top team in 20th New Mexico Supercomputing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fund LasDubeyChallenge Melrose named top team in

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

SUN CATCHER COTTAGE TEAM ILLINOIS U.S. Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of Energy U.S. Department ofSAN ANTONIOSNR DentonSTEP0-1SUN CATCHER COTTAGE TEAM

442

Jefferson Lab, ODU team up for center (Inside Business) | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson LabJefferson LabJLab OpenLabodu-team-center

443

Team develops 3-D sensor array for detection of neural responses  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmittedStatus TomAboutManus Site-InactiveLaboratoryTeamDecember » 3-D

444

Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.  

SciTech Connect (OSTI)

This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

1995-01-01T23:59:59.000Z

445

Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment  

SciTech Connect (OSTI)

This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

Allwine, K Jerry; Flaherty, Julia E.

2007-08-01T23:59:59.000Z

446

Part 1: Participatory Ergonomics Approach to Waste Container Handling Utilizing a Multidisciplinary Team  

SciTech Connect (OSTI)

This multidisciplinary team approach to waste container handling, developed within the Grassroots Ergonomics process, presents participatory ergonomic interpretations of quantitative and qualitative aspects of this process resulting in a peer developed training. The lower back, shoulders, and wrists were identified as frequently injured areas, so these working postures were a primary focus for the creation of the workers' training. Handling procedures were analyzed by the team to identify common cycles involving one 5 gallon (60 pounds), two 5 gallons (60 and 54 pounds), 30 gallon (216 pounds), and 55 gallon (482 pounds) containers: lowering from transporting to/from transport vehicles, loading/unloading on transport vehicles, and loading onto pallet. Eleven experienced waste container handlers participated in this field analysis. Ergonomic exposure assessment tools measuring these field activities included posture analysis, posture targeting, Lumbar Motion Monitor{trademark} (LMM), and surface electromyography (sEMG) for the erector spinae, infraspinatus, and upper trapezius muscles. Posture analysis indicates that waste container handlers maintained non-neutral lower back postures (flexion, lateral bending, and rotation) for a mean of 51.7% of the time across all activities. The right wrist was in non-neutral postures (radial, ulnar, extension, and flexion) a mean of 30.5% of the time and the left wrist 31.4%. Non-neutral shoulder postures (elevation) were the least common, occurring 17.6% and 14.0% of the time in the right and left shoulders respectively. For training applications, each cycle had its own synchronized posture analysis and posture target diagram. Visual interpretations relating to the peak force modifications of the posture target diagrams proved to be invaluable for the workers' understanding of LMM and sEMG results (refer to Part II). Results were reviewed by the team's field technicians and their interpretations were developed into ergonomic training that address the issues originally raised. This training includes intervention methods, ergonomic tools used, dam acquired, and effects of waste container handling techniques on lower back, shoulder, and wrists and methods to help proactively reduce injuries associated with this profession.

Zalk, D.M.; Tittiranonda, P.; Burastero, S.; Biggs, T.W.; Perry, C.M.; Tageson, R.; Barsnick, L.

2000-02-07T23:59:59.000Z

447

National performance review: Internal Team report to the Secretary. Volume 1  

SciTech Connect (OSTI)

The team received over 300 suggestions for changes in legislation, procedures, and directives that govern the operations of DOE. The suggestions were distilled to 41 issues. DOE employees want to be empowered in areas of decision-making and responsibility, believe that contracting can be done better, are eager to learn quality management, and believe that communications between HQ and field can be improved. A number of internal barriers to efficient operation were identified, that fell away; this can be continued through the Quality Council. Recommendations for action are listed. It is recommended that each of the issues that have been referred for action to a task force or focus group be followed by the Quality Council to successful resolution.

Not Available

1993-09-01T23:59:59.000Z

448

Automated solar cell assembly teamed process research. Semiannual subcontract report, December 6, 1993--June 30, 1994  

SciTech Connect (OSTI)

This is the second Semiannual Technical Progress Report for the program titled `Automated Solar Cell Assembly Teamed Process Research` funded under National Renewable Energy Laboratory (NREL) subcontract No. ZAG-3-11219-01. This report describes the work done on Phase II of the program in the period from December 6, 1993 to June 30, 1994. Spire`s objective in this program is to develop high throughput (5 MW/yr) automated processes for interconnecting thin (200 {mu}m) silicon solar cells. High yield will be achieved with these fragile cells through the development of low mechanical stress and low thermal stress processes. For example, a machine vision system is being developed for cell alignment without mechanically contacting the cell edges, while a new soldering process is being developed to solder metal interconnect ribbons simultaneously to a cells` front and back contacts, eliminating one of the two heating steps normally used for soldering each cell.

Nowlan, M. [Spire Corp., Bedford, MA (United States)

1995-01-01T23:59:59.000Z

449

Enhancing technology acceptance: The role of the subsurface contaminants focus area external integration team  

SciTech Connect (OSTI)

The US DOE is developing and deploying innovative technologies for cleaning up its contaminated facilities using a market-oriented approach. This report describes the activities of the Subsurface Contaminant Focus Area`s (SCFA) External Integration Team (EIT) in supporting DOE`s technology development program. The SCFA program for technology development is market-oriented, driven by the needs of end users. The purpose of EIT is to understand the technology needs of the DOE sites and identify technology acceptance criteria from users and other stakeholders to enhance deployment of innovative technologies. Stakeholders include regulators, technology users, Native Americans, and environmental and other interest groups. The success of this national program requires close coordination and communication among technology developers and stakeholders to work through all of the various phases of planning and implementation. Staff involved must be willing to commit significant amounts of time to extended discussions with the various stakeholders.

Kirwan-Taylor, H.; McCabe, G.H. [Battelle Seattle Research Center, WA (United States); Lesperance, A. [Pacific Northwest National Lab., Richland, WA (United States); Kauffman, J.; Serie, P.; Dressen, L. [EnvironIssues (United States)

1996-09-01T23:59:59.000Z

450

The Role of the Consequence Management Home Team in the Fukushima Daiichi Response  

SciTech Connect (OSTI)

The Consequence Management Home Team (CMHT) is a U.S. Department of Energy/National Nuclear Security Administration asset and played an important role in the U.S. response effort to the Fukushima Daiichi accident, ranging from the early days of the response to a continued involvement in supporting late phase efforts. Each stage of their work had distinct characteristics in terms of management of incoming data streams and creation of products. The CMHT assisted a variety of response organizations with modeling; radiological operations planning; field monitoring techniques; and the analysis, interpretation, and distribution of radiological data. In the Fukushima Daiichi response, the CMHT grew to include a broader range of support than was historically planned. Through their work, the social and economic impacts of a nuclear or radiological incident were minimized. The CMHT was an integral component of the response in Japan and acted as the central point from which all of the data and products flowed.

Pemberton, Wendy [Remote Sensing Laboratory at Nellis; Mena, RaJah [Remote Sensing Laboratory at Nellis; Beal, William [Remote Sensing Laboratory at Andrews

2012-05-01T23:59:59.000Z

451

Solar energy grid integration systems : final report of the Florida Solar Energy Center Team.  

SciTech Connect (OSTI)

Initiated in 2008, the Solar Energy Grid Integration Systems (SEGIS) program is a partnership involving the U.S. DOE, Sandia National Laboratories, private sector companies, electric utilities, and universities. Projects supported under the program have focused on the complete-system development of solar technologies, with the dual goal of expanding utility-scale penetration and addressing new challenges of connecting large-scale solar installations in higher penetrations to the electric grid. The Florida Solar Energy Center (FSEC), its partners, and Sandia National Laboratories have successfully collaborated to complete the work under the third and final stage of the SEGIS initiative. The SEGIS program was a three-year, three-stage project that include conceptual design and market analysis in Stage 1, prototype development and testing in Stage 2, and moving toward commercialization in Stage 3. Under this program, the FSEC SEGIS team developed a comprehensive vision that has guided technology development that sets one methodology for merging photovoltaic (PV) and smart-grid technologies. The FSEC team's objective in the SEGIS project is to remove barriers to large-scale general integration of PV and to enhance the value proposition of photovoltaic energy by enabling PV to act as much as possible as if it were at the very least equivalent to a conventional utility power plant. It was immediately apparent that the advanced power electronics of these advanced inverters will go far beyond conventional power plants, making high penetrations of PV not just acceptable, but desirable. This report summarizes a three-year effort to develop, validate and commercialize Grid-Smart Inverters for wider photovoltaic utilization, particularly in the utility sector.

Ropp, Michael (Northern Plains Power Technologies, Brookings, SD); Gonzalez, Sigifredo; Schaffer, Alan (Lakeland Electric Utilities, Lakeland, FL); Katz, Stanley (Satcon Technology Corporation, Boston, MA); Perkinson, Jim (Satcon Technology Corporation, Boston, MA); Bower, Ward Isaac; Prestero, Mark (Satcon Technology Corporation, Boston, MA); Casey, Leo (Satcon Technology Corporation, Boston, MA); Moaveni, Houtan (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Click, David (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Davis, Kristopher (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Reedy, Robert (Florida Solar Energy Center of the University of Central Florida, Cocoa, FL); Kuszmaul, Scott S.; Sena-Henderson, Lisa; David, Carolyn; Akhil, Abbas Ali

2012-03-01T23:59:59.000Z

452

Vol. XXXVII, No. 1 January 2014 A team from New Mexico's Water Resources Research Institute, aided by a national  

E-Print Network [OSTI]

Vol. XXXVII, No. 1 January 2014 A team from New Mexico's Water Resources Research Institute of researchers from New Mexico's Water Resources Research Institute (NM WRRI), with help and advice from other scientists around the globe, are taking on the challenge of creating a measurable water budget for New Mexico

Johnson, Eric E.

453

Locating RF Emitters with Large UAV Teams Paul Scerri, Robin Glinton, Sean Owens, Steven Okamoto and Katia Sycara  

E-Print Network [OSTI]

Locating RF Emitters with Large UAV Teams Paul Scerri, Robin Glinton, Sean Owens, Steven Okamoto The rapidly improving availability of small, unmanned aerial vehicles (UAVs) and their ever reducing cost is leading to considerable interest in multi-UAV applications. How- ever, while UAVs have become smaller

Scerri, Paul

454

Department of Mechanical Engineering Spring 2013 Improving Vehicle Efficiency for Shell Eco-marathon Competition (Team 2)  

E-Print Network [OSTI]

131 competing teams. Objectives Select a new high speed electric hub motor to implement a new "coast Electric Hub Motor o Identified customer needs o Researched and selected motor based on specifications o the coast and burn technique Proved that the coast and burn technique can apply to electrical motors

Demirel, Melik C.

455

Project Team Elizabeth Rodini, Lecturer, Department of the History of Art, Krieger School of Arts & Sciences; Nora  

E-Print Network [OSTI]

Project Team Elizabeth Rodini, Lecturer, Department of the History of Art, Krieger School of Arts study, such as how collections are organized in a space, the history of collections through time in their architectural, historical, and narrative complexities. This "museum database" addresses several pedagogical

Gray, Jeffrey J.

456

Page: 1 Date Saved: 2010-07-19 Joint Collaborative Team on Video Coding (JCT-VC)  

E-Print Network [OSTI]

Page: 1 Date Saved: 2010-07-19 Joint Collaborative Team on Video Coding (JCT-VC) of ITU-T SG16 WP3 block is formed by extrapolating pixels neighbouring the current block to be coded. It is then subtracted from the current block prior encoding the resulting residual. When blocks have regular textures

Paris-Sud XI, Université de

457

Review of the National Ignition Campaign 2009-2012 John Lindl, Otto Landen, John Edwards, Ed Moses, and NIC Team  

E-Print Network [OSTI]

2009-2012 John Lindl,1 Otto Landen,1 John Edwards,1 Ed Moses,1 and NIC Team1,2,3,4,5,6,7,8 1 Lawrence Livermore National Laboratory, Livermore, California 94550, USA 2 Laboratory for Laser Energetics to the completion of the National Ignition Facility (NIF) in 2009. The scope of the NIC was the planning

458

The Challenges of Migration as a Long-term Preservation Strategy: The Findings of TEAM Norway and LongRec*  

E-Print Network [OSTI]

The Challenges of Migration as a Long-term Preservation Strategy: The Findings of TEAM Norway and LongRec* Feng Luan; Norwegian University of Science and Technology; Trondheim, Norway Mads Nygård; Norwegian University of Science and Technology; Trondheim, Norway Lars Gaustad; National Library of Norway

Nørvåg, Kjetil

459

SMEs; Virtual R&D Teams and New Product Development: A Literature Nader Ale Ebrahim, Shamsuddin Ahmed and Zahari Taha  

E-Print Network [OSTI]

technology change and product variety expansion in the new manufacturing environment, SMEs must be ableSMEs; Virtual R&D Teams and New Product Development: A Literature Review Nader Ale Ebrahim, University of Malaya Abstract: Small and medium-sized enterprises (SMEs) are indeed the engines of global

Paris-Sud XI, Université de

460

Project Recap This project challenged the team with the task of creating a new custom blaster that could be  

E-Print Network [OSTI]

Project Recap This project challenged the team with the task of creating a new custom blaster Streamline© foam darts After construction of the blaster, we set the following procedures to test of redness on skin from direct dart impact. In conclusion to this project, the blaster incorporates new

Demirel, Melik C.

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry Schroeder, David Shaw  

E-Print Network [OSTI]

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry and supporting mobile devices that access Purdue data and information. Hypothesis We anticipate there would be several advantages from providing a model of supporting mobile devices. These advantages would be in areas

462

THE ERL HIGH-ENERGY COOLER FOR RHIC* I. Ben-Zvi** for the electron cooling team***,  

E-Print Network [OSTI]

]. The design evolved during the past 5 years. The present design will use classical (non-magnetized) electron presents many challenges to the design of the cooler. The cooling is slowed down by the high- energyTHE ERL HIGH-ENERGY COOLER FOR RHIC* I. Ben-Zvi** for the electron cooling team***, C-AD, BNL

463

Abstract--Multimedia groupware systems provide rich support for distributed team work. Yet effective design of these systems is  

E-Print Network [OSTI]

evolve design ideas. The problem is that multimedia groupware is hard to prototype because distributed that inform the design of universally accepted toolkits for building distributed multimedia systems: we1 Abstract--Multimedia groupware systems provide rich support for distributed team work. Yet

Greenberg, Saul

464

Dining Guide Nourishing you with great food is what your dining team is all about, our goal  

E-Print Network [OSTI]

guests and team · Continue to build and innovate our dining program · Embrace social, nutritional Services Best Vegan Recipe Contest--First Place · 2008 Hobart Sustainability Award--First Place · 2008 Hope international specialty bars. Leading the way in sustainability, this dining hall also features a 20ft salad bar

California at Santa Cruz, University of

465

Probing Structural Dynamics with High Spatial and Temporal Resolution Research Team: Nigel Browning, James Evans, Patricia Abellan, Russell Tonkyn  

E-Print Network [OSTI]

Probing Structural Dynamics with High Spatial and Temporal Resolution Research Team: Nigel Browning of the structural dynamics that occur on the s-ns timescale We will make use of a unique aberration-corrected dynamic TEM (DTEM), where a photoemission source will enable these time-resolved images to be obtained at

466

Structure and Dynamics of Biological Systems Research Team: James E. Evans, Daniel E. Perea, Xiao-Ying Yu, Zihua Zhu  

E-Print Network [OSTI]

Structure and Dynamics of Biological Systems Research Team: James E. Evans, Daniel E. Perea, Xiao for atomic resolution structure determination; observe dynamics using a pump-probe regime. Dynamic TEM probe tomography to interrogate the structure and dynamics of biological systems

467

The Coastal Ocean Applications and Science Team (COAST): Science Support for a Geostationary Ocean Color Imager for Coastal Waters  

E-Print Network [OSTI]

intensity, events, e.g. the impacts of an increase in the yearly number of hurricanes, to more slowing of the coastal ocean. Project Description: The Coastal Ocean Applications and Science Team (COAST) was formed productivity and chlorophyll fluorescence, data management Peter Strutton, coastal carbon cycle, Harmful Algal

Kurapov, Alexander

468

ADOPT-A-CELL PROGRAM Help support the success of the CalSol solar team by  

E-Print Network [OSTI]

ADOPT-A-CELL PROGRAM Help support the success of the CalSol solar team by adopting a small part. $20: Solar Encapsulation High-tech solar lamination improves solar energy collection and increases the durability of solar cells. The money will go towards laminating one single solar cell. $50: Solar Cell Solar

Mofrad, Mohammad R. K.

469

INTELLIGENCE PLANNING AND TOURISM. PERSPECTIVE AND THE OBSERVATORIES OIDTE EIDT, TAG TEAM TERRITORIOS POSIBLES. CASES IN ARGENTINA AND  

E-Print Network [OSTI]

1 INTELLIGENCE PLANNING AND TOURISM. PERSPECTIVE AND THE OBSERVATORIES OIDTE EIDT, TAG TEAM_fabricio@hotmail.com Summary: Territorial intelligence applied to tourism seeks to resolve tensions, build projects and subjects compatible between tourism and other logics of territorial occupation and appropriation

Paris-Sud XI, Université de

470

The Sting Racing Team's Entry to the Urban Matthew Powers, Dave Wooden, Magnus Egerstedt, Henrik Christensen, and  

E-Print Network [OSTI]

The Sting Racing Team's Entry to the Urban Challenge Matthew Powers, Dave Wooden, Magnus Egerstedt/Crusher, the LAGR project [2, 3])in which the world is static and the robot itself is the primary moving object. Externally, perception processes provide fused sensing information based on a wide array of sensing

Egerstedt, Magnus

471

Funding Opportunity: Team-Based Design in Biomedical Engineering Education (R25) Sponsor: National Institutes of Biomedical Imaging and  

E-Print Network [OSTI]

Funding Opportunity: Team-Based Design in Biomedical Engineering Education (R25) Sponsor: National Institutes of Biomedical Imaging and Bioengineering (NIBIB) National Institute of Child Health and Human: May 13, 2014 Program Synopsis The mission of the National Institute of Biomedical Imaging

Suzuki, Masatsugu

472

Funding Opportunity: Team-Based Design in Biomedical Engineering Education (R25) Sponsor: National Institutes of Biomedical Imaging and  

E-Print Network [OSTI]

Funding Opportunity: Team-Based Design in Biomedical Engineering Education (R25) Sponsor: National Institutes of Biomedical Imaging and Bioengineering (NIBIB) National Institute of Child Health and Human: May 18, 2012 Program Synopsis The mission of the National Institute of Biomedical Imaging

Suzuki, Masatsugu

473

Introduction > Team models > KAoS > MECA > Conclusion 1/24 Jurriaan van Diggelen Utrecht University/TNO Rich cognitive models 16 January 2009  

E-Print Network [OSTI]

Introduction > Team models > KAoS > MECA > Conclusion 1/24 Jurriaan van Diggelen Utrecht UniversityS Policies Jurriaan van Diggelen Utrecht University, the Netherlands #12;Introduction > Team models > KAoS > MECA > Conclusion 2/24 Jurriaan van Diggelen Utrecht University/TNO Rich cognitive models 16 January

Diggelen, Jurriaan van

474

Guidelines for Vocal Tract Development Lab (VT Lab) team members to access the VT Lab WebSpace via the VT Lab website  

E-Print Network [OSTI]

Guidelines for Vocal Tract Development Lab (VT Lab) team members to access the VT Lab WebSpace via the VT Lab website The VTLab WebSpace is a new and improved mechanism for VT lab team members to share files. We are replacing the former Member Login section of our website with MyWeb Space (developed by Do

Vorperian, Houri K.

475

Powertrain Design for Shell Eco-marathon UrbanConcept Vehicle The team was tasked with designing the powertrain for a highly fuel efficient vehicle. The  

E-Print Network [OSTI]

Powertrain Design for Shell Eco-marathon UrbanConcept Vehicle Overview The team was tasked with designing the powertrain for a highly fuel efficient vehicle. The vehicle was designed to conform possible fuel efficiency. Finally, the team transported the vehicle to Houston, Texas and successfully

Demirel, Melik C.

476

Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports  

SciTech Connect (OSTI)

A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

1993-12-01T23:59:59.000Z

477

One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant  

SciTech Connect (OSTI)

The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria.

Skwarek, Raymond J. [Washington River Protection Systems, Richland, WA (United States); Harp, Ben J. [USDOE Office of River Protection, Richland, WA (United States); Duncan, Garth M. [Bechtel National, Inc. (United States)

2013-12-18T23:59:59.000Z

478

Proceedings of the sixth Atmospheric Radiation Measurement (ARM) Science Team meeting  

SciTech Connect (OSTI)

This document contains the summaries of papers presented at the 1996 Atmospheric Radiation Measurement (ARM) Science Team meeting held at San Antonio, Texas. The history and status of the ARM program at the time of the meeting helps to put these papers in context. The basic themes have not changed. First, from its beginning, the Program has attempted to respond to the most critical scientific issues facing the US Global Change Research Program. Second, the Program has been strongly coupled to other agency and international programs. More specifically, the Program reflects an unprecedented collaboration among agencies of the federal research community, among the US Department of Energy`s (DOE) national laboratories, and between DOE`s research program and related international programs, such as Global Energy and Water Experiment (GEWEX) and the Tropical Ocean Global Atmosphere (TOGA) program. Next, ARM has always attempted to make the most judicious use of its resources by collaborating and leveraging existing assets and has managed to maintain an aggressive schedule despite budgets that have been much smaller than planned. Finally, the Program has attracted some of the very best scientific talent in the climate research community and has, as a result, been productive scientifically.

NONE

1997-06-01T23:59:59.000Z

479

UTC for Computational Engineering CJ Brooks, AIJ Forrester, AJ Keane, CEDG, School of Engineering Sciences  

E-Print Network [OSTI]

dimensional problems and large data samples. A gradient-based approach is advocated here, where derivatives by correlating densely sampled low-fidelity data with sparsely sampled high-fidelity data. The aerodynamic shape optimisation of a transonic compressor rotor is used to demonstrate the methodology. The aim

Sóbester, András

480

Faces of Energy: Peter O'Konski Builds a Better Forrestal and...  

Broader source: Energy.gov (indexed) [DOE]

of the Office of Management, Ingrid Kolb cut the ribbon on the new Headquarters Mobile Work Center. | Energy Department file photo, credit Ken Shipp. Peter O'Konski,...

Note: This page contains sample records for the topic "team ei-21 forrestal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A Quest for Insularity: Thomas Forrest's _Voyage to New Guinea, and the Moluccas_  

E-Print Network [OSTI]

the fall of 1773, Samuel Johnson and James Boswell recordedto the Hebrides with Samuel Johnson, LL.D. (1785) reproduceLondon: Verso, 2007. Johnson, Samuel, and James Boswell. A

Lorlertratna, Panida

2012-01-01T23:59:59.000Z

482

Page 1 of 7 Fleischman CV August 2013 Forrest D. Fleischman  

E-Print Network [OSTI]

Servant Behavior and Forest Policy Implementation in Central India. Committee: Elinor Ostrom (Chair), Arun & Environmental Affairs & Department of Political Science: Joint PhD in Public Policy Awarded August 2012. Concentrations: Public Policy, Environmental Policy, Political Theory & Methodology Dissertation Title: Public

483

Page 1 of 7 Fleischman CV September 2014 Forrest D. Fleischman  

E-Print Network [OSTI]

Servant Behavior and Forest Policy Implementation in Central India. Committee: Elinor Ostrom (Chair), Arun-making in Central India. Plan to submit to Policy Sciences, Fall 2014. Fleischman, F.D. What we know and don't know & Environmental Affairs & Department of Political Science: Joint PhD in Public Policy Awarded August 2012

484

A Quest for Insularity: Thomas Forrest's _Voyage to New Guinea, and the Moluccas_  

E-Print Network [OSTI]

Stevenson, Robert Louis. Treasure Island. Ed. Wendy R. Katz.Louis Stevensons Treasure Island (1883). Ironically, thebeen marooned on the Treasure Island for years, is found on

Lorlertratna, Panida

2012-01-01T23:59:59.000Z

485

The USDOE Forrestal Lighting Retrofit: Analysis of Electricity and Thermal Savings  

E-Print Network [OSTI]

,705 or 76% of the total monetary savings. The measured energy savings performed within 90% of the estimated savings. Quite surprisingly, the thermal savings which were not included in initial estimates by the USDOE accounted for $102,824 or 24...

Haberl, J. S.; Bou-Saada, T. E.

1995-01-01T23:59:59.000Z

486

The Committee met at 8:30 a.m., in Room 8E-089, Forrestal  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1.Texas-Louisiana-* * *-+ +

487

The Committee met in Room 8E089 in the Forrestal Building, 1800  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1.Texas-Louisiana-* * *-+

488

The Committee met in Conference Room 8E-089 in the Forrestal  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1.Texas-Louisiana-* *

489

The Committee met in Room 1E-245 of the Forrestal Building,  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1.Texas-Louisiana-* *

490

The Committee met in Room 1E-246 of the Forrestal Building at  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 10 MECS Survey Data9c :0.1 Housing Unit3.1.Texas-Louisiana-*

491

Forrest Abouelnasr | Center for Gas SeparationsRelevant to Clean Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. TheEPSCI HomeTours, ProgramsClean EnergyTechnologies |

492

U.S. Department of Energy Forrestal Building, Washington, D.C. | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of EnergyTheDepartmentFeed Families" | Departmentforof

493

U.S. Department of Energy Forrestal Building, Washington, D.C. | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012 Greenbuy325, 2014 Office ofMay 20, 2008 |Department ofof

494

OFFICZ OF OCCUPAIIOXAL EILhLlH h SAFZETY JAXRS FORRESTAL CAMPUS  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCT 28 1% - :NEW; I.-'7-TAC~$,. ' e' , U?

495

For 40 Years, Longtime Barber Brings Style, Savings to Department of Energy's Forrestal Building  

Broader source: Energy.gov [DOE]

David Besenyei and Ron Wilson cut hair at the Razor's Edge, a barbershop that operates out of Department of Energy's headquarters in D.C.

496

Group Entry Team Members Project name Advisor G/U MajorConcentration GL 40 Abdul Azeez  

E-Print Network [OSTI]

Group Entry Team Members Project name Advisor G/U MajorConcentration GL 40 Abdul Azeez A STUDY Members Project name Advisor G/U MajorConcentration 5/11/2011 5:00:00 PM SORTED BY GRAD Advisor G/U MajorConcentration 5/11/2011 5:00:00 PM SORTED BY GRAD/UNDERGRAD AND ALPHA OF PARTICIPANTS GL

497

Emergency and backup power supplies at Department of Energy facilities: Augmented Evaluation Team -- Final report  

SciTech Connect (OSTI)

This report documents the results of the Defense Programs (DP) Augmented Evaluation Team (AET) review of emergency and backup power supplies (i.e., generator, uninterruptible power supply, and battery systems) at DP facilities. The review was conducted in response to concerns expressed by former Secretary of Energy James D. Watkins over the number of incidents where backup power sources failed to provide electrical power during tests or actual demands. The AET conducted a series of on-site reviews for the purpose of understanding the design, operation, maintenance, and safety significance of emergency and backup power (E&BP) supplies. The AET found that the quality of programs related to maintenance of backup power systems varies greatly among the sites visited, and often among facilities at the same site. No major safety issues were identified. However, there are areas where the AET believes the reliability of emergency and backup power systems can and should be improved. Recommendations for improving the performance of E&BP systems are provided in this report. The report also discusses progress made by Management and Operating (M&O) contractors to improve the reliability of backup sources used in safety significant applications. One area that requires further attention is the analysis and understanding of the safety implications of backup power equipment. This understanding is needed for proper graded-approach implementation of Department of Energy (DOE) Orders, and to help ensure that equipment important to the safety of DOE workers, the public, and the environment is identified, classified, recognized, and treated as such by designers, users, and maintainers. Another area considered important for improving E&BP system performance is the assignment of overall ownership responsibility and authority for ensuring that E&BP equipment performs adequately and that reliability and availability are maintained at acceptable levels.

Not Available

1993-11-01T23:59:59.000Z

498

Crusader Automated Docking System: Technology support for the Crusader Resupply Team. Interim report, Ammunition Logistics Program  

SciTech Connect (OSTI)

The US Army and Team Crusader (United Defense, Lockheed Martin Armament Systems, etc.) are developing the next generation howitzer, the Crusader. The development program includes an advanced, self-propelled liquid propellant howitzer and a companion resupply vehicle. The resupply vehicle is intended to rendezvous with the howitzer near the battlefront and replenish ammunition, fuel, and other material. The Army has recommended that Crusader incorporate new and innovative technologies to improve performance and safety. One conceptual design proposes a robotic resupply boom on the resupply vehicle to upload supplies to the howitzer. The resupply boom would normally be retracted inside the resupply vehicle during transit. When the two vehicles are within range of the resupply boom, the boom would be extended to a receiving port on the howitzer. In order to reduce exposure to small arms fire or nuclear, biological, and chemical hazards, the crew would remain inside the resupply vehicle during the resupply operation. The process of extending the boom and linking with the receiving port is called docking. A boom operator would be designated to maneuver the boom into contact with the receiving port using a mechanical joystick. The docking operation depends greatly upon the skill of the boom operator to manipulate the boom into docking position. Computer simulations at the National Aeronautics and Space Administration have shown that computer-assisted or autonomous docking can improve the ability of the operator to dock safely and quickly. This document describes the present status of the Crusader Autonomous Docking System (CADS) implemented at Oak Ridge National laboratory (ORNL). The purpose of the CADS project is to determine the feasibility and performance limitations of vision systems to satisfy the autonomous docking requirements for Crusader and conduct a demonstration under controlled conditions.

Kring, C.T.; Varma, V.K.; Jatko, W.B.

1995-11-01T23:59:59.000Z

499

A study of the relationship between trust and the effective communication of information within project teams of large high tech organizations  

E-Print Network [OSTI]

This study investigates the effects trust has on the truthfulness of communications and its effectiveness within a project team. The research focuses specifically on organizational context, the situational forces that exist ...

Scherer, Alyson

2008-01-01T23:59:59.000Z

500

Manufacturing Change at the John Deere Harvester Works: Report on the Visit of the Ad Hoc Lean Aircraft Initiative Team, June 7, 1994  

E-Print Network [OSTI]

On June 7, 1994, an Ad Hoc team from LAI visited John Deere to conduct an informal benchmark of John Deere's successful change to Leaner Manufacturing. This report summarizes the results of that trip, as well as summarizing ...

Stahl, Fred