1

An overview of task order 10  

SciTech Connect (OSTI)

Task Order 10 formalizes a collaboration in high explosive pulsed power (HEPP) experiments between LANL and VNIIEF. The focus is the VNIIEF disk explosive magnetic generator (DEMG) technology. The task order outlines a sequence of tasks and deliverables culminating in an experiment which takes place in the US utilizing US explosives and a Russian DEMG. This talk summarizes task order 10. It gives a brief history and present status in terms of the proposed high pressure EOS experiment (ALT-3).

Rousculp, Christopher L [Los Alamos National Laboratory

2011-01-12T23:59:59.000Z

2

Fiscal Year 2005 Solar Radiometry and Metrology Task Accomplishments  

SciTech Connect (OSTI)

The National Renewable Energy Laboratory (NREL) Solar Radiometry and Metrology task provides traceable optical radiometric calibrations and measurements to photovoltaic (PV) researchers and the PV industry. Traceability of NREL solar radiometer calibrations to the World Radiometric Reference (WRR) was accomplished during Pyrheliometer Comparison at NREL in October 2004. Ten spectral and more than 200 broadband radiometers for solar measurements were calibrated this year. We measured detailed spectral distributions of the NREL and PV industry Pulsed Solar Simulators and are analyzing the influence of environmental variables on radiometer uncertainty. New systems for indoor and outdoor solar radiometer calibrations and ultraviolet (UV) spectral measurements and UV radiometer calibrations were purchased and tested. Optical metrology functions support the NREL Measurement and Characterization Task effort for ISO 17025 accreditation of NREL Solar Reference Cell Calibrations and have been integrated into the NREL quality system and audited for ISO17025 compliance.

Myers, D.; Andreas, A.; Reda, I.; Gotseff, P.; Wilcox, S.; Stoffel, T.; Anderberg, M.; Kay, B.; Bowen, A.

2005-11-01T23:59:59.000Z

3

Energy Department Awards First Major Task Order Under Streamlined...  

Energy Savers [EERE]

First Major Task Order Under Streamlined Contracting System Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis...

4

Modeling Task Systems Using Parameterized Partial Orders Fred Houben  

E-Print Network [OSTI]

metrics of interest (timing, resource usage, energy usage, or cost). The number of design parameters of partial orders, expressive enough to compactly represent large task graphs with repetitive behavior. We are typically described in terms of task graphs representing partially ordered sets of tasks. In prac- tice, we

Vaandrager, Frits

5

Task Order Price Evaluation Worksheet for SUPER ESPC | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Document provides a worksheet for evaluating price for a task order as part of a Super Energy Savings Performance Contract (ESPC). priceevalworksheet.doc More Documents &...

6

DOE Awards Small Business Task Order for Technical Support to...  

Office of Environmental Management (EM)

nuclear energy research. Addthis Related Articles DOE Awards Support Service Contract DOE Awards Small Business Task Order for Technical Support to the Office of...

7

DOE Awards Small Business Task Order for Technical Support to...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Contract Awarded to Small Business for Support Services DOE Awards Support Service Contract DOE Awards Small Business Task Order for Technical Support to the Office of...

8

DOE Awards Research and Systems Engineering Task Order  

Broader source: Energy.gov [DOE]

Cincinnati – The U.S. Department of Energy (DOE) today awarded a task order to The MITRE Corporation, of McLean Virginia.

9

Fiscal year 1997 final report for task plan SR-16WT-31 task B, vitrification of ion exchange material  

SciTech Connect (OSTI)

In Fiscal Year 1997, the Department of Energy Tanks Focus Area (TFA) funded the Savannah River Technology Center (SRTC) to develop and demonstrate the vitrification of a CST ion exchange material loaded with radioactive cesium from one of the Melton Valley Storage Tanks at the Oak Ridge National Laboratory (ORNL). SRTC developed a patent-pending glass formulation that can be used to vitrify CST sorbent producing a quality borosilicate glass waste form. SRTC demonstrated this formulation by vitrifying the radioactive CST in the SRTC shielded cells melter.In addition to the formulation developed for vitrification of the `CST-only` glass waste form, SRTC also developed formulations for vitrification of CST coupled with High-Level Waste (HLW) sludges. A Defense Waste Processing Facility (DWPF) coupled feed formulation has been developed with up to 10 weight percent CST and 28 weight percent DWPF sludge oxides. A coupled Hanford formulation has also been developed for producing quality glass waste forms with up to 10 weight percent CST and 45 weight percent Hanford sludge oxides. The significant accomplishments of this project were then development of CST-only glass formulations incorporating up to 65 weight-percent CST, development of techniques for delivering a slurry or dry feed to a joule-heated melter, demonstration of a CST-only glass formulation in a continuous melter operation, demonstration of compliance with the Nevada Test Site (NTS) Waste Acceptance Criteria (WAC), development of CST-sludge glass formulations incorporating up to 10 weight percent CST and 28 weight percent DWPF sludges oxides, demonstration of CST-sludge glass formulations using radioactive sludge and radioactive CST, development of CST-sludge glass formulations incorporating up to 10 weight percent CST and 45 weight percent. All commitments made to the TFA have been met as indicated by the associated milestones. Milestones and the month in which they were completed: Initiate Immobilization of CST in Glass (completed 8/97); Demonstrate that Sludge-CST Glass Satisfied PC Specs in WAPS (completed 9/97); Determine Process Parameters of Sludge-CST Glass (completed 8/97); Demonstrate that CST-Only Glass Satisfied PC Specs in WAPS (completed 9/97); Determine Process Parameters of CST-Only Glass (completed 9/97). The results for Task B of Task Plan SR-16WT-31 have been documented in reports that have been included as attachments. The following is a summary of the attachments from the CST vitrification project.

Ferrara, D.; Andrews, M.K.; Harbour, J.R.; Fellinger, T.L.; Herman, D.T.; Marshall, K.M.; Workman, P.J.

1997-09-30T23:59:59.000Z

10

DV/Payment Requests, PCARD, IOs and Purchase Orders. The following is required by Fiscal Office in order to process your request and to avoid delay in  

E-Print Network [OSTI]

DV/Payment Requests, PCARD, IOs and Purchase Orders. The following is required by Fiscal Office that is of an "Official Function" nature, or mainly when food items are purchased. This includes business meals, training and recruiting costs. As well, these must be signed and originals sent. 5. There are two types of Purchase orders

11

Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2 (April 2012)Tie Ltd |Line, LLC:LLC | DepartmentLLCPowerReport |

12

Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2 (April 2012)Tie Ltd |Line, LLC:LLC | DepartmentLLCPowerReport |Report

13

Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2 (April 2012)Tie Ltd |Line, LLC:LLC | DepartmentLLCPowerReport

14

Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2 (April 2012)Tie Ltd |Line, LLC:LLC | DepartmentLLCPowerReportReport |

15

EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order  

Broader source: Energy.gov [DOE]

BAGRAM AIRFIELD, Afghanistan – EM employee James Hawkins is currently serving the U.S. military in Afghanistan, where he is administering a $5.8 billion task order for the Army.

16

Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report  

SciTech Connect (OSTI)

This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry. Objectives for 2.1.7 are the following: • To work with stakeholders to streamline the MHK regulatory permitting process. • To work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development. • To communicate research findings and directions to the MHK industry and stakeholders. • To engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which are described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning As the MHK industry works with the regulatory community and stakeholders to plan, site, permit and license MHK technologies they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under 2.1.7 is to understand these varied interests, explore mechanisms to reduce conflict, identify efficiencies, and ultimately identify pathways to reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

Geerlofs, Simon H.; Hanna, Luke A.; Judd, Chaeli R.; Blake, Kara M.

2012-09-01T23:59:59.000Z

17

DOE ESPC TASK ORDER REQUEST FOR PROPOSAL (TO RFP) TEMPLATE (11/20/08)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebratePartnersDepartment DOE ESPC TASK ORDER REQUEST FOR PROPOSAL

18

Task order #24 update: exploration of damage mechanisms in cylindrical geometry  

SciTech Connect (OSTI)

A typical method of failure for ductile materials is spallation damage, which is caused by the nucleation, growth and coalescence of voids due to the presence of high tensile stress in the material. Spallation damage models, such as TEPLA, are currently implemented in hydrodynamic computer codes used at Los Alamos National Laboratory (LANL). Parameters for such constitutive models are derived from data sets obtained primarily from gas gun and shock-driven experiments, which are designed to allow one-dimensional analysis of the evolution of the failure characteristics. However, in a non-planar geometry, advanced failure models predict failure to be a multi-dimensional process. Additionally, a limited amount of data exists for the process of void nucleation, growth and coalescence. Another lightly researched area is the state of the material in the event that the spallation layer is recollected and voids are closed. The experiments described here are being conducted as part of a Campaign-l effort to provide data addressing these issues. The Russian Damage Experimental Series is designed to provide fundamental non-planar (cylindrical) spallation damage data, including early time processes (void nucleation, growth and coalescence) and late time processes (recollection of the spallation layer). Previous experiments produced data addressing some of the early time processes. This presentation will be provided to LANL and VNIIEF colleagues as a means of assessing the status of Task Order No.24 at the current time.

Kaul, Ann M [Los Alamos National Laboratory

2011-01-14T23:59:59.000Z

19

LMS/RUL/S11973 Task Order LM00-502  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ _ _ AmchitkaS11973 Task

20

Task Order Awarded to Small Business for Natural Gas Services | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartmentChallengeCompliance7/109THETTU U . .Task Force

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Task Order Price Evaluation Worksheet for SUPER ESPC | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION1 - In13 - InBlue RibbonAuditofofTask

22

Effects of Electromagnetic Fields on Fish and Invertebrates: Task 2.1.3: Effects on Aquatic Organisms - Fiscal Year 2011 Progress Report - Environmental Effects of Marine and Hydrokinetic Energy  

SciTech Connect (OSTI)

This fiscal year (FY) 2011 progress report (Task 2.1.3 Effects on Aquatic Organisms, Subtask 2.3.1.1 Electromagnetic Fields) describes studies conducted by PNNL as part of the DOE Wind and Water Power Program to examine the potential effects of electromagnetic fields (EMF) from marine and hydrokinetic devices on aquatic organisms, including freshwater and marine fish and marine invertebrates. In this report, we provide a description of the methods and results of experiments conducted in FY 2010-FY 2011 to evaluate potential responses of selected aquatic organisms. Preliminary EMF laboratory experiments during FY 2010 and 2011 entailed exposures with representative fish and invertebrate species including juvenile coho salmon (Oncorhynchus kisutch), Atlantic halibut (Hippoglossus hippoglossus), California halibut (Paralicthys californicus), rainbow trout (Oncorhynchus mykiss), and Dungeness crab (Metacarcinus magister). These species were selected for their ecological, commercial, and/or recreational importance, as well as their potential to encounter an MHK device or transmission cable during part or all of their life cycle. Based on previous studies, acute effects such as mortality were not expected to occur from EMF exposures. Therefore, our measurement endpoints focused on behavioral responses (e.g., detection of EMF, interference with feeding behavior, avoidance or attraction to EMF), developmental changes (i.e., growth and survival from egg or larval stage to juvenile), and exposure markers indicative of physiological responses to stress. EMF intensities during the various tests ranged from 0.1 to 3 millitesla, representing a range of upper bounding conditions reported in the literature. Experiments to date have shown there is little evidence to indicate distinct or extreme behavioral responses in the presence of elevated EMF for the species tested. Several developmental and physiological responses were observed in the fish exposures, although most were not statistically significant. Additional species are currently planned for laboratory testing in the next fiscal year (e.g. an elasmobranch, American lobster) to provide a broader assessment of species important to stakeholders. The collective responses of all species will be assessed in terms of life stage, exposure scenarios, and biological relevance, to address current uncertainties related to effects of EMF on aquatic organisms.

Woodruff, Dana L.; Schultz, Irvin R.; Marshall, Kathryn E.; Ward, Jeffrey A.; Cullinan, Valerie I.

2012-05-01T23:59:59.000Z

23

Theoretical description of laser melt pool dynamics, Task order number B239634, Quarter 3 report  

SciTech Connect (OSTI)

Melting of solid matter under laser radiation is realized in almost every process of laser technology. The present paper addresses melted material flows in cases when melt zones are shallow, i.e., the zone width is appreciably greater than or of the same order as its depth. Such conditions are usually realized when hardening, doping or perforating thin plates or when using none-deep penetration. Melted material flowing under conditions of deep penetration, drilling of deep openings and cutting depends on a number of additional factors (as compared to the shallow-pool case), namely, formation of a vapor and gas cavern in the sample and propagation of the laser beam through the cavern. These extra circumstances complicate hydrodynamic consideration of the liquid bath and will be addressed is the paper to follow.

Dykhne, A.

1995-05-10T23:59:59.000Z

24

Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report  

SciTech Connect (OSTI)

Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

Stenner, Robert D.

2005-09-28T23:59:59.000Z

25

Hanford Cultural Resources Laboratory annual report for fiscal year 1989  

SciTech Connect (OSTI)

This report summarizes activities of the Hanford Cultural Resources Laboratory (HCRL) during fiscal year 1989. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966, the Archaeological Resources Protection Act of 1979, and the American Indian Religious Freedom Act of 1978. A major task in FY 1989 was completion and publication of the Hanford Cultural Resources Management Plan, which prioritizes tasks to be undertaken to bring the US Department of Energy -- Richland Operations into compliance with federal statutes, relations, and guidelines. During FY 1989, six tasks were performed. In order of priority, these were conducting 107 cultural resource reviews, monitoring the condition of 40 known prehistoric archaeological sites, assessing the condition of artifact collections from the Hanford Site, evaluating three sites and nominating two of those to the National Register of Historic Places, developing an education program and presenting 11 lectures to public organizations, and surveying approximately 1 mi{sup 2} of the Hanford Site for cultural resources. 7 refs., 4 figs., 4 tabs.

Chatters, J.C.; Cadoret, N.A.; Minthorn, P.E.

1990-06-01T23:59:59.000Z

26

Hanford Cultural Resources Laboratory annual report for fiscal year 1990  

SciTech Connect (OSTI)

The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy Field Office, Richland (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with federal statutes and regulations. This report summarizes activities of the HCRL during fiscal year (FY) 1990. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks. The task list guided cultural resources management activities during FY 1990 and is the outline for this report. In order, these tasks were to (1) conduct cultural resource reviews, (2) develop an archaeological resources protection plan, (3) monitor the condition of known archaeological sites, (4) plan a curation system for artifacts and records, (5) evaluate cultural resources for potential nomination to the National Register of Historic Places, (6) educate the public about cultural resources, (7) conduct a sample archaeological survey of Hanford lands, and (8) gather ethnohistorical data from Native American elders.

Chatters, J.C.; Gard, H.A.; Minthorn, P.E.

1991-11-01T23:59:59.000Z

27

Effects of Electromagnetic Fields on Fish and Invertebrates Task 2.1.3: Effects on Aquatic Organisms Fiscal Year 2012 Progress Report Environmental Effects of Marine and Hydrokinetic Energy  

SciTech Connect (OSTI)

Energy generated by the world’s oceans and rivers offers the potential to make substantial contributions to the domestic and global renewable energy supply. However, the marine and hydrokinetic (MHK) energy industry faces challenges related to siting, permitting, construction, and operation of pilotand commercial-scale facilities. One of the challenges is to understand the potential effects to marine organisms from electromagnetic fields, which are produced as a by-product of transmitting power from offshore to onshore locations through underwater transmission cables. This report documents the progress of the third year of research (fiscal year 2012) to investigate environmental issues associated with marine and hydrokinetic energy (MHK) generation. This work was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) Wind and Water Technologies Office. The report addresses the effects of electromagnetic fields (EMFs) on selected marine species where significant knowledge gaps exist. The species studied this fiscal year included one fish and two crustacean species: the Atlantic halibut (Hippoglossus hippoglossus), Dungeness crab (Metacarcinus magister), and American lobster (Homarus americanus).

Woodruff, Dana L.; Cullinan, Valerie I.; Copping, Andrea E.; Marshall, Kathryn E.

2013-05-20T23:59:59.000Z

28

Animal intrusion status report for fiscal year 1989  

SciTech Connect (OSTI)

The Protective Barrier and Warning Marker System Development Plan identified tasks that need to be completed to design a final protective barrier to implement in-place disposal of radioactive waste. This report summarizes the animal intrusion tasks that were conducted by Westinghouse Hanford Company in fiscal years 1988 and 1989 with respect to small mammals and water infiltration. 2 refs., 8 figs., 6 tabs.

Landeen, D.S.

1990-08-01T23:59:59.000Z

29

First interim report of the Federal Fleet Conversion Task Force  

SciTech Connect (OSTI)

The Federal Fleet Conversion Task Force was created by Executive Order 12844, signed by President Clinton on April 21, 1993. In the Order, the President directed that purchases of alternative fueled vehicles by the Federal Government be substantially increased beyond the levels required by current law. The President charged the Task Force with developing recommendations for carrying out the Executive Order, with special emphasis on setting a course that will lead to the widespread use of alternative fueled vehicles by Federal, State, and local government fleets, by private fleets and, ultimately, by individuals. The chief recommendation of the Task Force is the establishment of a Presidential Clean Cities Initiative. To support creation of the Presidential Initiative, the Task Force identified 38 cities and regions, prioritized into three tiers, for concentrating the Initiative`s efforts in Fiscal Years 1994 through 1996. This concentration of effort is key to the effectiveness of the Initiative. The 38 cities and regions would receive priority funding for Federal vehicle purchases and for infrastructure development. In addition, the Task Force has made specific recommendations for overcoming numerous regulatory, economic, and technical barriers that have slowed the introduction of alternative fueled vehicles into general use.

Not Available

1993-08-01T23:59:59.000Z

30

ORDER  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the ContributionsArms Control R&DNuclear fuelOPTICS FOR A PHOTOINJECTEDthe YearORDER

31

Fiscal Policy in India: Lessons and Priorities  

E-Print Network [OSTI]

Fiscal Policy in India, N. Singh and T.February 2004 Fiscal Policy in India: Lessons andReview, 7-26. Fiscal Policy in India, N. Singh and T. N.

Singh, Nirvikar; Srinivasan, T. N.

2004-01-01T23:59:59.000Z

32

FY 2006 Executive Order 13101 Report: Department of Energy Affirmative...  

Broader source: Energy.gov (indexed) [DOE]

6 Executive Order 13101 Report: Department of Energy Affirmative Procurement and Recycling Fiscal Year 2006 Report, 31207 FY 2006 Executive Order 13101 Report: Department of...

33

Hydrogen program summary Fiscal Year 1994  

SciTech Connect (OSTI)

The annual program summary provides stakeholders within the hydrogen community with a snapshop of important advances that have occurred in the National Hydrogen Program over the fiscal year, including industry interactions and cooperation. The document will also be used to encourage additional potential industrial partners to join the Hydrogen Program Team. Fiscal Year 1994 marked a turning point for the Hydrogen Program, with a budget that grew significantly. The focus of the program was broadened to include development of hydrogen production technologies using municipal solid waste and biomass, in addition to an increased emphasis on industrial involvement and near-term demonstration projects. In order to maintain its near- and long-term balance, the Hydrogen Program will continue with basic, fundamental research that provides the long-term, high-risk, high-payoff investment in hydrogen as an energy carrier.

Not Available

1995-03-01T23:59:59.000Z

34

Prior Fiscal Years  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home DesignPresentationsSRS Responds to TrainPrior-Fiscal-Years Sign In

35

Proposition 13 and The California Fiscal Shell Game  

E-Print Network [OSTI]

and The California Fiscal Shell Game Notes Others, however,13 and The California Fiscal Shell Game References Abadie,13 and The California Fiscal Shell Game Kogan, Vladimir, and

McCubbins, Colin H; McCubbins, Mathew D

2010-01-01T23:59:59.000Z

36

Accountability report - fiscal year 1997  

SciTech Connect (OSTI)

This document contains the US NRC`s accountability report for fiscal year 1997. Topics include uses of funds, financial condition, program performance, management accountability, and the audited financial statement.

NONE

1998-04-01T23:59:59.000Z

37

Budget estimates, fiscal year 1997. Volume 12  

SciTech Connect (OSTI)

This report contains the fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1997.

NONE

1996-03-01T23:59:59.000Z

38

Fiscal Federalism and Decentralization in India?  

E-Print Network [OSTI]

Issues in Tax Policy and Reform in India, paper presented atA Sustainable Fiscal Policy for India: An InternationalA Sustainable Fiscal Policy for India: An International

Singh, Nirvikar

2007-01-01T23:59:59.000Z

39

Annual report on surveillance and maintenance activities at Oak Ridge National Laboratory, Oak Ridge, Tennessee, fiscal year 1996  

SciTech Connect (OSTI)

In fiscal year (FY) 1995, the sites and facilities from both the Remedial Action (RA) and Decontamination and Decommissioning (D and D) programs were combined to form the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Surveillance and Maintenance (S and M) Program. Surveillance and Maintenance activities were conducted throughout FY 1996 at the RA facilities. Overall, the RA S and M Program consists of approximately 650 acres that include 14 waste area groupings with approximately 200 sites. These sites include 46 major facilities, several leak and contaminated soil sites, 38 inactive tanks, approximately 50 environmental study areas and approximately 2,973 wells and boreholes. Site inspections were conducted at established frequencies on appropriate sites in the RA S and M Program in accordance with the established S and M FY 1996 Incentive Task Order (ITO).

NONE

1996-11-01T23:59:59.000Z

40

Hanford Cultural Resources Laboratory annual report for Fiscal Year 1991  

SciTech Connect (OSTI)

The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Act of 1979 and the American Indian Religious Freedom Act of 1978. HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations and guidelines. For fiscal year 1991 these tasks were to (1) ensure compliance with NHPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, (5) conduct a sample archaeological survey of Hanford lands, and (6) gather ethnohistorical data from Indian elders. Research conducted as a spinoff from these tasks is also reported. The archaeological site monitoring program is designed to determine whether the RL`s cultural resource management and protection policies are effective; results are used in planning for cultural resource site management and protection. Forty-one sites were monitored during this fiscal year.

Chatters, J.C.; Gard, H.A.

1992-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Hanford Cultural Resources Laboratory annual report for Fiscal Year 1991  

SciTech Connect (OSTI)

The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Act of 1979 and the American Indian Religious Freedom Act of 1978. HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan (HCRMP) as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations and guidelines. For fiscal year 1991 these tasks were to (1) ensure compliance with NHPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, (5) conduct a sample archaeological survey of Hanford lands, and (6) gather ethnohistorical data from Indian elders. Research conducted as a spinoff from these tasks is also reported. The archaeological site monitoring program is designed to determine whether the RL's cultural resource management and protection policies are effective; results are used in planning for cultural resource site management and protection. Forty-one sites were monitored during this fiscal year.

Chatters, J.C.; Gard, H.A.

1992-08-01T23:59:59.000Z

42

Fiscal Year 2013 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2013-11-01T23:59:59.000Z

43

Fiscal Year 2012 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2012-11-01T23:59:59.000Z

44

EMSL Fiscal Year 2008 Annual Report  

SciTech Connect (OSTI)

This annual report provides details on the research conducted at EMSL--the Environmental Molecular Sciences Laboratory in Fiscal Year 2008.

Showalter, Mary Ann

2009-01-23T23:59:59.000Z

45

Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy...  

Broader source: Energy.gov (indexed) [DOE]

Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report U.S....

46

Fiscal Year 2013 Department of Energy Annual Occupational Safety...  

Energy Savers [EERE]

Fiscal Year 2013 Department of Energy Annual Occupational Safety and Health Report for Federal Employees to the Secretary of Labor Fiscal Year 2013 Department of Energy Annual...

47

Solar thermal electric: Program overview fiscal years 1993--1994  

SciTech Connect (OSTI)

The Solar Thermal Electric Program Overview and Accomplishments for Fiscal Years 1993--1994 are documented.

NONE

1995-03-01T23:59:59.000Z

48

Fiscal Year 2009 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Michael Lewis

2009-10-01T23:59:59.000Z

49

Fiscal Year 2010 Revegetation Assessment  

SciTech Connect (OSTI)

This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

Jenifer Nordstrom; Mike Lewis

2010-11-01T23:59:59.000Z

50

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993  

SciTech Connect (OSTI)

During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program`s oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994.

Not Available

1993-12-31T23:59:59.000Z

51

Fiscal Year 1997 (Summer 1996-Spring 1997)  

E-Print Network [OSTI]

Fiscal Year 1997 (Summer 1996-Spring 1997) A total of 517 students studied abroad; an additional 62) N Am: 36 (10) #12;Oceania: 39 (1) S Am: 100 (2) July, 1997 #12;

Willson, Stephen J.

52

Instructionally Related Activities Fiscal Year 20142015 Budget  

E-Print Network [OSTI]

#12; Instructionally Related Activities Fiscal Year 20142015 Budget California State University, Fullerton This budget has been approved by the President ......................................................................................................... ix Budget Policy Statements, Procedures, and Guidelines Role of the Chair, IRA Committee

de Lijser, Peter

53

Titan Student Centers Fiscal Year 20142015 Budget  

E-Print Network [OSTI]

#12; Titan Student Centers Fiscal Year 20142015 Budget California State University, Fullerton This budget has been approved by the ASI Board of Directors, the ASI% Budgeted # of Paying Students 7,500 37,250 34

de Lijser, Peter

54

Budget estimates fiscal year 1995: Volume 10  

SciTech Connect (OSTI)

This report contains the Nuclear Regulatory Commission (NRC) fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1995. The NRC 1995 budget request is $546,497,000. This is an increase of $11,497,000 above the proposed level for FY 1994. The NRC FY 1995 budget request is 3,218 FTEs. This is a decrease of 75 FTEs below the 1994 proposed level.

Not Available

1994-02-01T23:59:59.000Z

55

Calcination/dissolution chemistry development Fiscal year 1995  

SciTech Connect (OSTI)

The task {open_quotes}IPC Liaison and Chemistry of Thermal Reconstitution{close_quotes} is a $300,000 program that was conducted in Fiscal Year (FY) 1995 with U.S. Department of Energy (DOE) Office of Research and Development (EM-53) Efficient Separations and Processing Crosscutting Program supported under technical task plan (TTP) RL4-3-20-04. The principal investigator was Cal Delegard of the Westinghouse Hanford Company (WHC). The task encompassed the following two subtasks related to the chemistry of alkaline Hanford Site tank waste: (1) Technical Liaison with the Institute of Physical Chemistry of the Russian Academy of Science (IPC/RAS) and its research into the chemistry of transuranic elements (TRU) and technetium (Tc) in alkaline media. (2) Laboratory investigation of the chemistry of calcination/dissolution (C/D) (or thermal reconstitution) as an alternative to the present reference Hanford Site tank waste pretreatment flowsheet, Enhanced Sludge Washing (ESW). This report fulfills the milestone for the C/D subtask to {open_quotes}Provide End-of-Year Report on C/D Laboratory Test Results{close_quotes} due 30 September 1995. A companion report, fulfilling the milestone to provide an end-of-year report on the IPC/RAS liaison, also has been prepared.

Delegard, C.H.

1995-09-01T23:59:59.000Z

56

Northwest Power and Conservation Council FISCAL YEAR 2007 BUDGET  

E-Print Network [OSTI]

Northwest Power and Conservation Council FISCAL YEAR 2007 BUDGET AND FISCAL YEAR 2006 REVISIONS...................................... 1 B. STABILIZING LONG-TERM FUNDING.................................. 2 BUDGET HISTORY (FIGURE 1)............................................................ 5 BUDGET BY FUNCTION (FIGURE 2) .................................................... 6 BUDGET

57

Council Document 2012-5 Fiscal Year 2014 Budget  

E-Print Network [OSTI]

May 2012 Council Document 2012-5 Fiscal Year 2014 Budget and Fiscal Year 2013 Revisions #12;ii B. Budget History.............................................................................................. 2 Budget History by Function (Figure 1) ............................................... 4 Budget

58

Council Document 2011-08 Fiscal Year 2013 Budget  

E-Print Network [OSTI]

July 2011 Council Document 2011-08 Fiscal Year 2013 Budget and Fiscal Year 2012 Revisions #12;ii B. Budget History.............................................................................................. 2 Budget History by Function (Figure 1) ............................................... 4 Budget

59

Northwest Power and Conservation Council FISCAL YEAR 2008 BUDGET  

E-Print Network [OSTI]

Northwest Power and Conservation Council FISCAL YEAR 2008 BUDGET AND FISCAL YEAR 2007 REVISIONS...................................... 1 B. STABILIZING LONG-TERM FUNDING.................................. 2 BUDGET HISTORY (FIGURE 1)............................................................ 5 BUDGET BY FUNCTION (FIGURE 2) .................................................... 6 BUDGET

60

Out of control? : local democracy failure and fiscal control boards  

E-Print Network [OSTI]

The nation's current recession has strained the finances of local governments such that many cities with already delicate budgets have plunged into fiscal crisis. This dissertation examines three causes of fiscal crisis - ...

Kobes, Deborah Isadora

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...  

Office of Environmental Management (EM)

EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan...

62

Competition Advocates and Task-Order and Delivery Order Ombudsman |  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartmentStewardshipAdministration helps|STEMChernobylMarch 2015 NMMSS

63

Hanford Site Groundwater Monitoring for Fiscal Year 2001  

SciTech Connect (OSTI)

This report provides information on the status of groundwater monitoring at the Hanford Site during fiscal year 2001.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2002-02-28T23:59:59.000Z

64

Fiscal Year 2010 Greenhouse Gas Inventory  

E-Print Network [OSTI]

Fiscal Year 2010 Greenhouse Gas Inventory OREGON STATE UNIVERSITY #12;OREGON STATE UNIVERSITYGHG UNIVERSITYGHG Report - FY10 3 Acknowledgments Due to the broad scope of this inventory, a large number of people Oil: Amber Sams · Enterprise Rent-A-Car: Davion Reese · First Student: Brian Maxwell · Good Company

Escher, Christine

65

Fiscal Year 2009 Greenhouse Gas Inventory  

E-Print Network [OSTI]

Fiscal Year 2009 Greenhouse Gas Inventory Oregon State University Greg Smith Sustainability Program #12;Acknowledgments Due to the broad scope of this inventory, a large number of people from many - First Student: Brian Maxwell - Carson Oil: Gena Conner Government Organizations - Baker County: Jason

Escher, Christine

66

Fiscal Year 2007 Greenhouse Gas Inventory  

E-Print Network [OSTI]

Fiscal Year 2007 Greenhouse Gas Inventory Greg Smith Brandon Trelstad OSU Facilities Services June #12;#12;Acknowledgments Due to the broad scope of this inventory, a large number of people from many, geothermal, tidal or sea currents etc. (7) "OUS Method" refers to the inventory for FY07 that is similar

Escher, Christine

67

Hanford Site Groundwater Monitoring for Fiscal Year 1999  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 1999 on the US. Department of Energy's Hanford Site, Washington. Water-level monitoring was performed to evaluate groundwater flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Measurements for site-wide maps were conducted in June in past years and are now measured in March to reflect conditions that are closer to average. Water levels over most of the Hanford Site continued to decline between June 1998 and March 1999. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of carbon-14, strontium-90, technetium-99, and uranium also exceeded drinking water standards in smaller plumes. Cesium-137 and plutonium exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in US Department of Energy Order 5400.5 were exceeded for plutonium, strontium-90, tritium, and uranium in small plumes or single wells. Nitrate and carbon tetrachloride are the most extensive chemical contaminants. Chloroform, chromium, cis-1,2dichloroethylene, cyanide, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; however, in most cases, they are believed to represent natural components of groundwater. ''Resource Conservation and Recovery Act of 1976'' groundwater monitoring continued at 25 waste management areas during fiscal year 1999: 16 under detection programs and data indicate that they are not adversely affecting groundwater; 6 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. Another site, the 120-D-1 ponds, was clean closed in fiscal year 1999, and monitoring is no longer required. Groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100 K, D, and H) and strontium-90 (100 N) reaching the Columbia River. The objective of two remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Groundwater monitoring continued at these sites and at other sites where there is no active remediation. Subsurface source characterization and vadose zone monitoring, soil-vapor monitoring, sediment sampling and characterization, and vadose zone remediation were conducted in fiscal year 1999. Baseline spectral gamma-ray logging at two single-shell tank farms was completed, and logging of zones at tank farms with the highest count rate was initiated. Spectral gamma-ray logging also occurred at specific retention facilities in the 200 East Area. These facilities are some of the most significant potential sources of remaining vadose zone contamination. Finally, remediation and monitoring of carbon tetradoride in the 200 West Area continued, with an additional 972 kilograms of carbon tetrachloride removed from the vadose zone in fiscal year 1999.

MJ Hartman; LF Morasch; WD Webber

2000-05-10T23:59:59.000Z

68

Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting...  

Broader source: Energy.gov (indexed) [DOE]

2 Fiscal Year 2013 Small Business Contracting Goals Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting Goals Attached is Policy Flash 2013-32 Fiscal Year 2013 Small...

69

OCRWM annual report to Congress, fiscal year 1997  

SciTech Connect (OSTI)

This report presents the progress in the activities of the Office of Civilian Radioactive Waste Management. Chapters include: Yucca Mountain site characterization project; Waste acceptance, storage and transportation project; Program management; Working with external parties; and Financial management. Also included in five appendices are: financial statements; key federal laws and regulations; fiscal year 1997 Congressional testimony and meetings with regulators and oversight bodies; OCREM publications for fiscal year 1997; and selected publications from other organizations during fiscal year 1997.

NONE

1998-07-01T23:59:59.000Z

70

Laboratory directed research and development. Annual report, fiscal year 1995  

SciTech Connect (OSTI)

This document is a compilation of the several research and development programs having been performed at the Pacific Northwest National Laboratory for the fiscal year 1995.

NONE

1996-02-01T23:59:59.000Z

71

Office of Energy Efficiency and Renewable Energy Fiscal Year...  

Office of Environmental Management (EM)

Energy Saving Homes, Buildings, and Manufacturing Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and...

72

EM Exceeds Fiscal Year 2013 Small Business Goals | Department...  

Broader source: Energy.gov (indexed) [DOE]

center, and EM Deputy Assistant Secretary for Acquisition and Project Management Jack Surash during DOE's Fiscal Year 2011 DOE Secretarial Small Business Awards Program Wednesday....

73

activities fiscal year: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Review Board as an independent agency within 106 The Smithsonian Institution Libraries in 1999Fiscal Year October 1, 1998-September 30, 1999 Biology and Medicine Websites Summary:...

74

area fiscal year: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Review Board as an independent agency within 97 The Smithsonian Institution Libraries in 1999Fiscal Year October 1, 1998-September 30, 1999 Biology and Medicine Websites Summary:...

75

analysis fiscal year: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Review Board as an independent agency within 98 The Smithsonian Institution Libraries in 1999Fiscal Year October 1, 1998-September 30, 1999 Biology and Medicine Websites Summary:...

76

Office of Energy Efficiency and Renewable Energy Fiscal Year...  

Office of Environmental Management (EM)

Sustainable Transportation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Sustainable Transportation Office of Energy Efficiency and Renewable...

77

Procurement Organization, Sandia National Laboratories. Annual report, fiscal year 1995  

SciTech Connect (OSTI)

This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1995. Activities for both the New Mexico and California locations are included.

Stimak, D.R.

1996-05-01T23:59:59.000Z

78

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2010  

SciTech Connect (OSTI)

This report outlines the science, awards and honors, and publications that resulted during the first quarter of Fiscal Year 2010 at EMSL.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.; Wiley, Julie G.; Reed, Jennifer R.

2010-02-04T23:59:59.000Z

79

Office of Energy Efficiency and Renewable Energy Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Renewable Electricity Generation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Renewable Electricity Generation Office of Energy Efficiency and...

80

Annual report procurement organization Sandia National Laboratories fiscal year 1996  

SciTech Connect (OSTI)

This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1996, Activities for both the New Mexico and California locations are included.

Palmer, D.L.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

E-Print Network 3.0 - assessment program fiscal Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The effectiveness of fiscal stimulus cannot be assessed independently of the medium-term fis- cal outlook. Given... Debt consolidation and fiscal stabilization of deep recessions...

82

COGNITIVE LEVELS OF TASKS MEMORIZATION TASKS  

E-Print Network [OSTI]

COGNITIVE LEVELS OF TASKS MEMORIZATION TASKS · Involve either reproducing previously learned facts. · Require limited cognitive demand for successful completion. · There is little ambiguity about what needs degree of cognitive effort. Although general procedures may be followed, they cannot be followed

Lee, Carl

83

Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992  

SciTech Connect (OSTI)

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

Not Available

1991-08-01T23:59:59.000Z

84

Offshore Oilfield Development Planning under Uncertainty and Fiscal Considerations  

E-Print Network [OSTI]

1 Offshore Oilfield Development Planning under Uncertainty and Fiscal Considerations Vijay Gupta1 of uncertainty and complex fiscal rules in the development planning of offshore oil and gas fields which involve, Offshore Oil and Gas, Multistage Stochastic, Endogenous, Production Sharing Agreements (PSAs) 1

Grossmann, Ignacio E.

85

Council Document 2013-06 Fiscal Year 2015 Budget  

E-Print Network [OSTI]

May 2013 Council Document 2013-06 DRAFT Fiscal Year 2015 Budget and Fiscal Year 2014 Revisions #12;ii TABLE OF CONTENTS A. MISSION, VALUES AND STRATEGIC GOALS STATEMENT .......... 1 B. Budget History.............................................................................................. 3 Budget History by Function (Figure 1) ............................................... 5 Budget

86

Council Document 2013-08 Fiscal Year 2015 Budget  

E-Print Network [OSTI]

July 2013 Council Document 2013-08 Fiscal Year 2015 Budget and Fiscal Year 2014 Revisions #12;ii TABLE OF CONTENTS A. MISSION, VALUES AND STRATEGIC GOALS STATEMENT .......... 1 B. Budget History.............................................................................................. 3 Budget History by Function (Figure 1) ............................................... 5 Budget

87

Accountability report. Fiscal Year 1996, Volume 2  

SciTech Connect (OSTI)

This report consolidates several performance-related reports into a single financial management report. Information in this report includes information previously reported in the following documents: (1) US Nuclear Regulatory Commission`s (NRC`s) annual financial statement, (2) NRC Chairman`s annual report to the President and the Congress, and (3) NRC Chairman`s semiannual report to Congress on management decisions and final actions on Office of Inspector General audit recommendations. This report also contains performance measures. The report is organized into the following subtopics: information about the US NRC, program performance, management accountability, and the audited financial statement for Fiscal Year 1996. 19 figs., 4 tabs.

NONE

1997-05-01T23:59:59.000Z

88

Fiscal Year 2013 Budget Request Briefing  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review:Department ofDistributionFire Protection ProgramDepartment ofFiscal Year 2010Program

89

Environmental fiscal reform (EFR) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (The followingDirectLowDiscussion-4,611,201.00fiscal reform (EFR)

90

Environmental Services Standard Tasks  

E-Print Network [OSTI]

1 Environmental Services Operations Standard Tasks The primary function of Environmental Services developed and implemented standard custodial tasks that meet industry standards. The standards are as follows: Exterior Building Cleaning Daily Clean ash urns Clean entry area glass Clean steps and remove

91

awards fiscal: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

rounds of activist fiscal policy. These began early in the recession with temporary tax cuts enacted in February 2008, followed by a first-time homebuyers tax credit enacted...

92

HONEYWELL - KANSAS CITY PLANT FISCAL YEARS 2009 THRU 2015 SMALL...  

National Nuclear Security Administration (NNSA)

- KANSAS CITY PLANT FISCAL YEARS 2009 THRU 2015 SMALL BUSINESS PROGRAM RESULTS & FORECAST CATEGORY Total Procurement Total SB Small Disad. Bus Woman-Owned SB Hub-Zone SB...

93

agency fiscal year: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 Economic Impact & Outreach 13 12;LETTER FROM THE DIRECTORS Dear 10 For Fiscal Year 1999 CiteSeer Summary: report was prepared as an account of work sponsored by an agency of...

94

Real Property Update Form Fiscal Year: 2007-2008  

E-Print Network [OSTI]

Real Property Update Form Fiscal Year: 2007-2008 Action: ___New CIP Record ___ Increase Existing CIP Record ___ Convert CIP to Completed Asset ___ Increase Existing Completed Asset ___ Newly Completed Asset (not formerly CIP) ___ Disposal ___ Other ___________________________ ___ Demolition 1

Caughman, John

95

Annual Hanford Seismic Report for Fiscal Year 2004  

SciTech Connect (OSTI)

This report describes seismic activity at and around the Hanford Site during Fiscal Year 2004. It is also the first description of seismic activity during the fourth quarter of FY04.

Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.

2004-12-07T23:59:59.000Z

96

Fiscal Year 2006 Washington Closure Hanford Science & Technology Plan  

SciTech Connect (OSTI)

This Washington Closure Hanford science and technology (S&T) plan documents the activities associated with providing S&T support to the River Corridor Closure Project for fiscal year 2006.

K.J. Kroegler, M. Truex, D.J. McBride

2006-01-19T23:59:59.000Z

97

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

98

Title XXXII, National Defense Autorization Act for Fiscal year...  

National Nuclear Security Administration (NNSA)

Defense Authorization Act for Fiscal Year 2000, Pub. L. 106- 65, as amended by the Energy and Water Development Appropriations Act, 2001, Pub. L. 106-377; the Floyd D. Spence...

99

automatic fiscal stabilisers: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

This paper examines the long term profile of fiscal deficit and debt relative to GDP in India, with a view to analysing debt-deficit sustainability issues along with the...

100

Hanford Site Groundwater Monitoring for Fiscal Year 2004  

SciTech Connect (OSTI)

This document presents the results of groundwater and vadose zone monitoring for fiscal year 2004 (October 2003 through September 2004)on the U.S. Department of Energy's Hanford Site in southeast Washington State.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2005-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Fiscal policy coordination in times of economic and financial crises   

E-Print Network [OSTI]

This thesis examines fiscal policy coordination in the EU during the Great Recession (2008-2010). For the first time since the Maastricht Treaty heralded the coordination of macroeconomic policies among EU Member States, ...

Rommerskirchen, Charlotte Sophie

2014-07-01T23:59:59.000Z

102

Associated Students, Inc. Fiscal Year 2014-2015 Budget  

E-Print Network [OSTI]

#12;Associated Students, Inc. Fiscal Year 2014-2015 Budget California State University, Fullerton This budget has been approved by the ASI Board of Directors, the ASI President & CEO, and the University ............................................................................................................................... viii Budget Policies and Procedures Finance Committee Process

de Lijser, Peter

103

Fiscal Year 2012 Greenhouse Gas Inventory: Government Totals  

Broader source: Energy.gov [DOE]

Excel spreadsheet shows scope 1, 2, and 3 greenhouse gas inventories reported by federal agencies in fiscal year 2012. It includes emissions from sources not subject to the reduction targets.

104

EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009  

SciTech Connect (OSTI)

The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

2009-02-02T23:59:59.000Z

105

Environmental Molecular Sciences Laboratory Annual Report: Fiscal Year 2006  

SciTech Connect (OSTI)

This report describes the activities and research performed at the Environmental Molecular Sciences Laboratory, a Department of Energy national scientific user facility at Pacific Northwest National Laboratory, during Fiscal Year 2006.

Foster, Nancy S.; Showalter, Mary Ann

2007-03-23T23:59:59.000Z

106

Consolidated financial statements for fiscal year 1996  

SciTech Connect (OSTI)

The following overview and accompanying audited financial statements have been prepared for Fiscal Year (FY) 1996 to report the financial position and the results of operations of the Department of Energy. These statements include the consolidated Statement of Financial Position and the consolidated Statement of Operations and Changes in Net Position. The statements have been prepared in accordance with the Office of Management and Budget Bulletin No. 94-01, Form and Content for Agency Financial Statements, and were developed in accordance with the hierarchy of accounting standards described therein. The overview provides a narrative on the Department of Energy`s mission, activities, and accomplishments. Utilizing performance measures as the primary vehicle for communicating Departmental accomplishments and results, this overview discusses the most significant measures while others are discussed in the supplemental information to the financial statements.

NONE

1997-02-01T23:59:59.000Z

107

Groundwater Annual Status Report for Fiscal Year 1998  

SciTech Connect (OSTI)

Groundwater protection activities and hydrogeologic characterization studies are conducted at LANL annually. A summary of fiscal year 1998 results and findings shows increased understanding of the hydrogeologic environment beneath the Pajarito Plateau and significant refinement to elements of the LANL Hydrogeologic Conceptual Model pertaining to areas and sources of recharge to the regional aquifer. Modeling, drilling, monitoring, and data collection activities are proposed for fiscal year 1999.

A. K. Stoker; A. S. Johnson; B. D. Newman; B. M. Gallaher; C. L. Nylander; D. B. Rogers; D. E. Broxton; D. Katzman; E. H. Keating; G. L. Cole; K. A. Bitner; K. I. Mullen; P. Longmire; S. G. McLin; W. J. Stone

1999-04-01T23:59:59.000Z

108

The effects of ego-involvement with the task upon the self-esteem/task performance relationship  

E-Print Network [OSTI]

that their self-concept concerning the job or task situation re- quires effective performance in order to result in "consistent" cognitions, then to that extent, they will be motivated to en- gage in effective performance. (Korman, 197Oi p 32) Stated more... simply ? individuals are motivated to maintain consistency between their self-esteem and their task performance (Korman, 1970). Individuals with high self-esteem, for example, will be motivated to perform well on a task in order to maintain...

Nilles, Carol Anne

1983-01-01T23:59:59.000Z

109

ATLAS Metadata Task Force  

E-Print Network [OSTI]

ATLAS Metadata Task Force D. Costanzo, J. Cranshaw, S.provided and approved by the ATLAS TDAQ and DCS Connectinformation, go to http://atlas-connect-forum.web.cern.ch/

Costanzo, D.; ATLAS Collaboration

2009-01-01T23:59:59.000Z

110

Fiscal federalism and its potential effects on public transportation in mid-sized cities  

E-Print Network [OSTI]

The current fiscally conservative climate on Capitol Hill, as the next surface transportation bill is being negotiated, may possibly carry over to a greater dependence on fiscal federalism for funding public transportation. ...

Jacobi, Amy Elizabeth

2012-01-01T23:59:59.000Z

111

Lifting task design associate: a knowledge-based system  

E-Print Network [OSTI]

the task Each of these task traits are important and are highly interactive NIOSH combined these four methodologies to define a set of equations in order to evaluate a lifting task Although the NIOSH evaluation is very procedural in nature, the numerous... intelligent system technology with the NIOSH lifting guidelines in order to provide a tool that will assist the workstation designer in the use of the NIOSH 1981 and 1992 lifting guidelines This system is to be called the LiAing Task Design Associate (LTDA...

Brooks, Susan Elaine

1993-01-01T23:59:59.000Z

112

Technical and management support for the development of Small Wind Systems. Fiscal year 1980 annual report, October 1, 1979-September 30, 1980  

SciTech Connect (OSTI)

The status and achievements of a program for the development, testing, and commercialization of wind energy systems rated under 100 kilowatts are described. The organization structure and task definition used to promote the production, marketing, and acceptance of small systems are described, and the Work Breakdown Structure under which the program is organized is detailed. Reports are given which describe the status of contracts funded by the Federal Wind Energy Program and managed by the Rocky Flats Wind Systems Program. These project reports, sequenced according to the Department of Energy Work Breakdown Structure, name the principal investigators involved, and discuss achievements and progress made during Fiscal Year 1980. Of fourty-four projects, seven were completed during the Fiscal Year. The Work Breakdown Structure Index details the organization sequence.

Not Available

1981-08-01T23:59:59.000Z

113

President Issues Executive Order Aimed at Preparing for the Impacts...  

Broader source: Energy.gov (indexed) [DOE]

President Issues Executive Order Aimed at Preparing for the Impacts of Climate Change; Tribal Leaders to Serve on Task Force President Issues Executive Order Aimed at Preparing for...

114

FY 1987 current fiscal year work plan  

SciTech Connect (OSTI)

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

115

Hanford Site groundwater monitoring for Fiscal Year 1997  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1997 on the Hanford Site, Washington. Soil-vapor extraction continued in the 200-West Area to remove carbon tetrachloride from the vadose zone. Characterization and monitoring of the vadose zone comprised primarily spectral gamma logging, soil-vapor monitoring, and analysis and characterization of sediments sampled below a vadose-zone monitoring well. Source-term analyses for strontium-90 in 100-N Area vadose-zone sediments were performed using recent groundwater-monitoring data and knowledge of strontium`s ion-exchange properties. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1996 and June 1997. Water levels near the Columbia River increased during this period because the river stage was unusually high. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-1,2-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level.

Hartman, M.J.; Dresel, P.E. [eds.] [and others] [eds.; and others

1998-02-01T23:59:59.000Z

116

Hanford Waste Treatment Plant Support Task Order Modified | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS Cable Projects HTS CableMay 2009

117

ESPC Sample Deliverables for Task Orders (IDIQ Attachment. J-4) |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ Contract Document displays aESPCDepartment of

118

ESPC Task Order Face Page Template | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ Contract Document displaysFace Page Template

119

ESPC Task Order Schedules and Placement of Pricing Information | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ Contract Document displaysFace Pageof

120

Energy Department Awards First Major Task Order Under Streamlined  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusiness Competition | DepartmentDepartmentProject

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Descriptions of ESPC Task Order Schedules and Placement of Pricing  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy CooperationRequirements Matrix U.S. Department of|AL 2010-07ARMY USScarcity Report

122

ESPC ENABLE Draft Task Order | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement ||MoreThisDepartmentDraft April

123

Task Order Awarded for Technical Support Services | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClient updateTRI-STATE GENERATIONDepartment of4.0

124

Descriptions of Task Order Schedules and Placement of Pricing Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat Pump Models |Conduct, Parent Company Agrees to CooperateJapan |Scarcity Report

125

Task Order Awarded for Environmental Technical Services | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION1 - In13 - InBlue RibbonAudit

126

Task Order Awarded for Technical and Safety Support Services | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION1 - In13 - InBlue RibbonAuditof

127

Attachment J-16 Portfolio Management Task Order 14-001  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program Cumulus Humilis Aerosol STATEMENT OFCHPRCJ-16Mod 323

128

Augmenting users' task performance through workspace narrative exploration  

E-Print Network [OSTI]

of their tasks by supporting them to retrieve desired work context more quickly and easily. In order to validate the proposed approach, a user study comparing task performances of the group with the Context Browser to the one without the Context Browser...

Park, Young Joo

2010-07-14T23:59:59.000Z

129

Ecological Monitoring and Compliance Program Fiscal Year 2003 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

Bechtel Nevada

2003-12-01T23:59:59.000Z

130

Inert Electrodes Program fiscal year 1988 annual report  

SciTech Connect (OSTI)

The Inert Electrodes Program, being conducted by Pacific Northwest Laboratory (PNL), involves improving the Hall-Heroult cells used by the Aluminum Industry for the electrochemical production of aluminum. The PNL research centers on developing more energy efficient, longer-lasting anodes and cathodes and ancillary equipment. Major accomplishments for Fiscal Year 1988 are summarized below. 14 refs., 56 figs., 9 tabs.

Strachan, D.M.; Marschman, S.C.; Davis, N.C.; Friley, J.R.; Schilling, C.H.

1989-10-01T23:59:59.000Z

131

Hanford Site Groundwater Monitoring for Fiscal Year 2002  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2002 on the U.S. Department of Energy's Hanford Site in Washington State. This report is written to meet the requirements in CERCLA, RCRA, the Atomic Energy Act of 1954, and Washington State Administrative Code.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2003-02-28T23:59:59.000Z

132

Budget Windows, Sunsets and Fiscal Control Alan J. Auerbach  

E-Print Network [OSTI]

Budget Windows, Sunsets and Fiscal Control Alan J. Auerbach University of California, Berkeley have struggled to find the right method of controlling public spending and budget deficits. In recent years, the United States has evaluated policy changes using a ten-year budget window. The use of a multi

Sadoulet, Elisabeth

133

Fiscal Policy and Utah's Oil and Gas Industry  

E-Print Network [OSTI]

Fiscal Policy and Utah's Oil and Gas Industry Michael T. Hogue, Research Analyst Introduction for oil and gas extraction firms. A recent review by the Government Accountability Office indicates features of Utah's oil and gas industry. The Oil and Gas Industry in Utah Reserves and Production Oil

134

Peak Oil and REMI PI+: State Fiscal Implications  

E-Print Network [OSTI]

, nation, and states) · Shale oil not included ­ Shale oil reserve estimates 2.0 Trillion bbls in USPeak Oil and REMI PI+: State Fiscal Implications Jim Peach Arrowhead Center Prosper Project is peak oil? · Why peak oil (and gas) matters ­ (In energy and non-energy states) ­ National Real GDP

Johnson, Eric E.

135

Incidental learning as a function of specificity of instructions and complexity of task  

E-Print Network [OSTI]

were discussed, but the studies showed conflicting results. These variables were number of presentations of the task, exposure time to the task materials, serial position effects, meaningfulness of stimuli, isolation effect, and motivation. In order... the intentional task would also increase, and accordingly the amount of incidental learning would decrease. The experiment proposed to measure the effect of varying the complexity of task, in order to control directly the amount of attention the S applies...

Baskin, Carol Scarboro

1971-01-01T23:59:59.000Z

136

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect (OSTI)

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

137

Photovoltaics: Contract lists, fiscal year 1992  

SciTech Connect (OSTI)

US DOE`s Photovoltaics Program has helped photovoltaic technologies evolve from materials and concepts in laboratories to competitive products rolling off automated assembly lines. The program is working to expand industrial capacity while continuing basic and applied technology R and D. This document is a tabulation of photovoltaics R and D that were begun, continued, or completed during this period. National laboratories or industrial, academic, and nonprofit research institutions perform the RR and D activities. The document is organized first by directing organization, then by project title and individual task. Each listing provides the name of contractor, period of performance, funding, objectives, accoplishments, and FY 1993 milestones. An index of contractors is included. (DLC)

Not Available

1993-03-01T23:59:59.000Z

138

Photovoltaic energy: Contract list, fiscal year 1990  

SciTech Connect (OSTI)

The federal government has conducted the National Photovoltaics Program since 1975. Its purpose is to provide focus, direction, and funding for the development of terrestrial photovoltaic technology as an energy option for the United States. In the past, a summary was prepared each year to provide an overview of the government-funded activities within the National Photovoltaics Program. Tasks conducted in-house by participating national laboratories or under contract by industrial, academic, and other research institutes were highlighted. This year's document is more concise than the summaries of previous years. The FY 1990 contract overview comprises a list of all subcontracts begun, ongoing, or completed by Sandia National Laboratory or the Solar Energy Research Institute during FY 1990 (October 1, 1989, through September 30, 1990). Under each managing laboratory, projects are listed alphabetically by project area and then by subcontractor name.

Not Available

1991-07-01T23:59:59.000Z

139

Laboratory directed research development annual report. Fiscal year 1996  

SciTech Connect (OSTI)

This document comprises Pacific Northwest National Laboratory`s report for Fiscal Year 1996 on research and development programs. The document contains 161 project summaries in 16 areas of research and development. The 16 areas of research and development reported on are: atmospheric sciences, biotechnology, chemical instrumentation and analysis, computer and information science, ecological science, electronics and sensors, health protection and dosimetry, hydrological and geologic sciences, marine sciences, materials science and engineering, molecular science, process science and engineering, risk and safety analysis, socio-technical systems analysis, statistics and applied mathematics, and thermal and energy systems. In addition, this report provides an overview of the research and development program, program management, program funding, and Fiscal Year 1997 projects.

NONE

1997-05-01T23:59:59.000Z

140

First and Second Quarters Hanford Seismic Report for Fiscal Year 2005  

SciTech Connect (OSTI)

This report describes the earthquakes that occurred in the Hanford seismic monitoring network during the first and second quarters of Fiscal Year 2005

Hartshorn, Donald C.; Reidel, Steve P.; Rohay, Alan C.; Sweeney, Mark D.; Clayton, Ray E.

2004-12-09T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1  

SciTech Connect (OSTI)

This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

Project Integration

2005-09-26T23:59:59.000Z

142

The Political Economy of India’s Fiscal Federal System and its Reform  

E-Print Network [OSTI]

Public Finance: Policy Issues for India, New Delhi: OxfordBank conference on India: Fiscal Policies to Acceleratepolicies and own investments have also determined resource flows across India’

Rao, M. Govinda; Singh, Nirvikar

2006-01-01T23:59:59.000Z

143

E-Print Network 3.0 - alternative medicinecam fiscal Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Beyond Alan J. Auerbach and William G. Gale Summary: III discusses the alternative ten- year projections. Section IV considers the longer-term fiscal... The Economic Crisis...

144

300 Area D4 Project Fiscal Year 2010 Building Completion Report  

SciTech Connect (OSTI)

This report summarizes the deactiviation, decontamination, decommissioning, and demolition activities of facilities in the 300 Area of the Hanford Site in fiscal year 2010.

Skwarek, B. J.

2011-01-27T23:59:59.000Z

145

Ecological Monitoring and Compliance Program Fiscal Year 1999 Report  

SciTech Connect (OSTI)

The Ecological and Compliance program, funded through the U. S. Department of Energy, Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1999. Program activities included: (1) biological surveys at proposed construction sites (2) desert tortoise compliance (3) ecosystem mapping (4) sensitive species and unique habitat monitoring and (5) biological monitoring at the HAZMAT Spill Center.

Cathy A. Wills

1999-12-01T23:59:59.000Z

146

Federal Geothermal Research Program Update - Fiscal Year 2001  

SciTech Connect (OSTI)

This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

Laney, P.T.

2002-08-31T23:59:59.000Z

147

Hanford Site Groundwater Monitoring for Fiscal Year 2000  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2000 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath each of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. RCRA groundwater monitoring continued during fiscal year 2000. Vadose zone monitoring, characterization, remediation, and several technical demonstrations were conducted in fiscal year 2000. Soil gas monitoring at the 618-11 burial ground provided a preliminary indication of the location of tritium in the vadose zone and in groundwater. Groundwater modeling efforts focused on 1) identifying and characterizing major uncertainties in the current conceptual model and 2) performing a transient inverse calibration of the existing site-wide model. Specific model applications were conducted in support of the Hanford Site carbon tetrachloride Innovative Treatment Remediation Technology; to support the performance assessment of the Immobilized Low-Activity Waste Disposal Facility; and in development of the System Assessment Capability, which is intended to predict cumulative site-wide effects from all significant Hanford Site contaminants.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2001-03-01T23:59:59.000Z

148

DOCUMENTATION SPECIFIC TASK TRAINING PROGRAM  

E-Print Network [OSTI]

DOCUMENTATION APPENDIX SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER ............................................................. Coordination of Contract Documents Art.105.05 Appendix Page 14

Illinois at Urbana-Champaign, University of

149

Os efeitos da sonegação fiscal na estrutura tributária ótima: experiência brasileira de aplicação das regras de 'lump-sum taxation'  

E-Print Network [OSTI]

da sonegação fiscal. No Brasil, os tributos ‘lump-sum’ sãobusca averiguar se, ao Brasil, aplicam-se as conclusões desonegação fiscal. Claro que o Brasil não passou recentemente

La Guardia, Renata

2007-01-01T23:59:59.000Z

150

Space and Movable Equipment Inventory Revision: July 31, 2014 CERTIFICATION OF SPACE AND MOVABLE EQUIPMENT INVENTORY -FISCAL YEAR 2014  

E-Print Network [OSTI]

Space and Movable Equipment Inventory Revision: July 31, 2014 CERTIFICATION OF SPACE AND MOVABLE EQUIPMENT INVENTORY - FISCAL YEAR 2014 TO BE USED FOR IBB PLANNING FOR FISCAL YEAR 2016 I acknowledge that the space and movable equipment inventory results conducted for this fiscal year will be used for IBB

Hayden, Nancy J.

151

Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.

Turner, J.W. [ed.

1993-12-01T23:59:59.000Z

152

INITIATIVE #4: Fiscal Responsibility Description and details about the program or initiative that is being proposed  

E-Print Network [OSTI]

2014 year-end is to hold the deficit at the FY 2013 level, and the 18-month goal is a FY 2015 budget a budget for the 2015 fiscal year that improves upon our budget position in fiscal year 2014 by ensuring? What will success look like in 12-18 months? The FY 2013 year-end budget deficit was $340

Saldin, Dilano

153

The University of Texas at Austin Budget for Fiscal Year 2013-14  

E-Print Network [OSTI]

The University of Texas at Austin Budget for Fiscal Year 2013-14 and 2014-2015 Legislative Process Officer *** STAFF COUNCIL MEETING May 27, 2014 #12;Agenda I. UT Austin Budget for FY 13-14 II. UT Austin Budget Preparation FY 14-15 III. Legislative Appropriations Request IV. Legislative Hearings V. Fiscal

Johnston, Daniel

154

The Budget Outlook and Options for Fiscal Policy Alan J. Auerbach  

E-Print Network [OSTI]

The Budget Outlook and Options for Fiscal Policy Alan J. Auerbach William G. Gale Peter R. Orszag;ABSTRACT This paper examines the federal budget outlook and evaluates alternative fiscal policy choices. Official projections of the federal budget surplus have declined dramatically in the past year. Adjusting

Sadoulet, Elisabeth

155

Task analysis: a detailed example of stepping up from JSA  

SciTech Connect (OSTI)

This paper discusses a pilot task analysis of operations in a proposed facility for the cutting and packaging of radioactively contaminated gloveboxes, for long-term storage or burial. The objective was to demonstrate how task analysis may be used as a tool for planning and risk management. Two specific products were generated - preliminary operating procedures and training requirements. The task data base, procedures list and training requirements developed were intended as first order categorizations. The analysis was limited to tasks that will be performed within the boundaries of the operational facility and the associated load-out area. The analysis documents tasks to be performed by D and D (Decontamination and Decommissioning) Workers. However, the analysis included all tasks identified as an integral part of glovebox processing within the facility. Thus tasks involving Radiation Protection Technicians (RPTs) are included. Based on hazard assessments, it is planned that at least two RPTs will be assigned full-time to the facility, so they may be considered part of its crew. Similarly, supervisory/administrative tasks are included where they were determined to be directly part of process sequences, such as obtaining appropriate certification. 11 tables.

Banks, W.W.; Paramore, B.A.; Buys, J.R.

1984-10-01T23:59:59.000Z

156

Hanford Site Groundwater Monitoring for Fiscal Year 1998  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose-zone monitoring and remediation for fiscal year (FY) 1998 on the Word Site, Washington. Soil-vapor extraction in the 200-West Area removed 777 kg of carbon tetrachloride in FY 1998, for a total of 75,490 kg removed since remediation began in 1992. Spectral gamma logging and evaluation of historical gross gamma logs near tank farms and liquid-disposal sites in the 200 Areas provided information on movement of contaminants in the vadose zone. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1997 and June 1998. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. One well completed in the basalt-confined aquifer beneath the 200-East Area exceeded the drinking water standard for technetium-99. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-l, Z-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level. Tetrachloroethylene exceeded its maximum contaminant level in several wells in the 300 Area for the first time since the 1980s. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; they are believed to represent natural components of groundwater. Resource Conservation and Recovery Act of 1976 groundwater monitoring continued at 25 waste management areas during FY 1998: 17 under detection programs and data indicate that they are not adversely affecting groundwater, 6 under interim-status groundwater-quality-assessment programs to assess possible contamination, and 2 under final-status corrective-action programs. Groundwater remediation in the 100 Areas continued to reduce the amount of strontium-90 (100-N) and chromium (100-K, D, and H) reaching the Columbia River. Two systems in the 200-West Area operated to prevent the spread of carbon tetrachloride and technetide uranium plumes. Groundwater monitoring continued at these sites and at other sites where there is no active remediation. A three-dimensional, numerical groundwater model was applied to simulate radionuclide movement from sources in the 200 Areas following site closure in 2050. Contaminants will continue to move toward the southeast and north (through Gable Gap), but the areas with levels exceeding drinking water standards will diminish.

Hartman, M.J. [and others

1999-03-24T23:59:59.000Z

157

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect (OSTI)

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

158

Ecological Monitoring and Compliance Program Fiscal Year 1998 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

Bechtel Nevada Ecological Services

1998-10-01T23:59:59.000Z

159

Fiscal Year 2013 - Conference Reporting Activities | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResourcesFLASH2011-11-OPAMFY 2007 TotalFinalJobs Findof Energyof79012Fiscal Year

160

FTCP Annual Report - Fiscal Year 2002 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCofConstruction Management14,2 -2 FTCP Annual Report - Fiscal Year

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

FTCP Annual Report - Fiscal Year 2004 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCofConstruction Management14,2 -2 FTCP Annual Report - Fiscal

162

Department of Energy's Fiscal Year 2014 Consolidated Financial Statements  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealing WithDevelopmentReport and7Department of EnergyFiscal

163

Hanford Site Groundwater Monitoring for Fiscal Year 2003  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2003 (October 2002 through September 2003) on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Concentrations of tritium, nitrate, and some other contaminants continued to exceed drinking water standards in groundwater discharging to the river in some locations. However, contaminant concentrations in river water remained low and were far below standards. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Hanford Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. Uranium exceeds standards in the 300 Area in the south part of the Hanford Site. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the ''Comprehensive Environmental Response, Compensation, and Liability Act'' is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. ''Resource Conservation and Recovery Act'' groundwater monitoring continued at 24 waste management areas during fiscal year 2003: 15 under interim or final status detection programs and data indicate that they are not adversely affecting groundwater; 7 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. During calendar year 2003, drillers completed seven new RCRA monitoring wells, nine wells for CERCLA, and two wells for research on chromate bioremediation. Vadose zone monitoring, characterization, and remediation continued in fiscal year 2003. Remediation and associated monitoring continued at a soil-vapor extraction system in the 200 West Area, which removes gaseous carbon tetrachloride from the vadose zone. Soil vapor also was sampled to locate carbon tetrachloride sites with the potential to impact groundwater in the future. DOE uses geophysical methods to monitor potential movement of contamination beneath single-shell tank farms. During fiscal year 2003, DOE monitored selected boreholes within each of the 12 single-shell tank farms. In general, the contaminated areas appeared to be stable over time. DOE drilled new boreholes at the T Tank Farm to characterize subsurface contamination near former leak sites. The System Assessment Capability is a set of computer modules simulating movement of contaminants from waste sites through the vadose zone and groundwater. In fiscal year 2003, it was updated with the addition of an atmospheric transport module and with newer versions of models including an updated groundwater flow and transport model.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2004-04-12T23:59:59.000Z

164

Task-space setpoint control of robots with dual task-space information  

E-Print Network [OSTI]

In conventional task-space control problem of robots, a single task-space information is used for the entire task. When the task-space control problem is formulated in image space, this implies that visual feedback is used ...

Cheah, C. C.

165

Energy Task Force FY11 Report  

E-Print Network [OSTI]

sulfur B20 (to date approximately 87% transition). In FY 11, these alternative fuel initiatives resulted inventory was updated with data from fiscal years 2008-2009. This continues a series of updates going back to 2001 (for continuous data back to 1990), allowing the University to monitor and assess

New Hampshire, University of

166

Crew resource management training's effect on railroad crews' perceptions of task interdependence and teamwork  

E-Print Network [OSTI]

perform the specified task or job and (2) the path by which work and/or information flows through the team in order to optimally perform the specified task or job (Arthur, Villado, & Bennett, in press). 4 Theories of team mental models suggest... successful team performance requires the individual to work with members of the team in order to optimally perform the specified task or job” (p. 3). Although tasks are often referred to as “interdependent” if to some degree they require input from...

Kyte, Tobin Bruce

2008-10-10T23:59:59.000Z

167

Hanford Site Groundwater Monitoring for Fiscal Year 2005  

SciTech Connect (OSTI)

This report is one of the major products and deliverables of the Groundwater Remediation and Closure Assessment Projects detailed work plan for FY 2006, and reflects the requirements of The Groundwater Performance Assessment Project Quality Assurance Plan (PNNL-15014). This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2005 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the west-central part of the Hanford Site. Hexavalent chromium is present in plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas. Technetium-99 and uranium plumes exceeding standards are present in the 200 Areas. A uranium plume underlies the 300 Area. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Resource Conservation and Recovery Act of 1976 groundwater monitoring continued at 25 waste management areas during fiscal year 2005: 15 under interim or final status detection programs and data indicate that they are not adversely affecting groundwater, 8 under interim status groundwater quality assessment programs to assess contamination, and 2 under final status corrective-action programs. During calendar year 2005, drillers completed 27 new monitoring wells, and decommissioned (filled with grout) 115 unneeded wells. Vadose zone monitoring, characterization, and remediation continued in fiscal year 2005. Remediation and associated monitoring continued at a soil-vapor extraction system in the 200 West Area, which removes gaseous carbon tetrachloride from the vadose zone. DOE uses geophysical methods to monitor potential movement of contamination beneath former waste sites.

Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

2006-02-28T23:59:59.000Z

168

Deep Vadose Zone–Applied Field Research Initiative Fiscal Year 2012 Annual Report  

SciTech Connect (OSTI)

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2012.

Wellman, Dawn M.; Truex, Michael J.; Johnson, Timothy C.; Bunn, Amoret L.; Golovich, Elizabeth C.

2013-03-14T23:59:59.000Z

169

Purchasing and Materials Management Organization, Sandia National Laboratories annual report, fiscal year 1993  

SciTech Connect (OSTI)

This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1993. Activities for both the New Mexico and California locations are included.

Martin, D.R.

1994-02-01T23:59:59.000Z

170

Unequal development : decentralization and fiscal disparities in the Metropolitan Zone of the Valley of Mexico  

E-Print Network [OSTI]

This study is about the impact of decentralization in metropolitan areas. Studies of fiscal decentralization have largely centered on the formal tiers of government, without looking at the effects of this process on the ...

Raich, Uri

2006-01-01T23:59:59.000Z

171

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2013 Activities and Achievements  

E-Print Network [OSTI]

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2013 Activities Institute for Telecommunication Sciences Pursuant to the Technology Transfer and Commercialization Act This report summarizes technology transfer activities and achievements of the Department of Commerce's (DOC

172

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2012 Activities and Achievements  

E-Print Network [OSTI]

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2012 Activities Institute for Telecommunication Sciences Pursuant to the Technology Transfer and Commercialization Act This report summarizes technology transfer activities and achievements of the Department of Commerce's (DOC

173

Battelle Energy Alliance, LLC, Continuity Readiness Assurance Report — Fiscal Year 2014  

SciTech Connect (OSTI)

This is a report generated for DOE-ID to summarize accomplishments made by the BEA Continuity of Operations program as a part of BEA Emergency Management at the INL during the past fiscal year.

Brandon C. Stucki; Sherman S. Campbell

2014-09-01T23:59:59.000Z

174

Research and educational activities at the MIT Research Reactor : Fiscal year 1968  

E-Print Network [OSTI]

A report of research and educational activities which utilized the Massachusetts Institute of Technology, five-megawatt, heavy water, research reactor during fiscal year 1968 has been prepared for administrative use at MIT ...

Massachusetts Institute of Technology. Department of Nuclear Engineering; 7102 Massachusetts Institute of Technology. Research Reactor. Staff; U.S. Atomic Energy Commission

1968-01-01T23:59:59.000Z

175

Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997  

SciTech Connect (OSTI)

In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.

none,

1999-08-13T23:59:59.000Z

176

Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1998  

SciTech Connect (OSTI)

In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1998.

none,

2000-03-20T23:59:59.000Z

177

Annual report procurement and logistics management center Sandia National Laboratories fiscal year 2002.  

SciTech Connect (OSTI)

This report summarizes the purchasing and transportation activities of the Procurement and Logistics Management Center for Fiscal Year 2002. Activities for both the New Mexico and California locations are included.

Palmer, David L.

2003-05-01T23:59:59.000Z

178

Nuclear Test-Experimental Science: Annual report, fiscal year 1988  

SciTech Connect (OSTI)

Fiscal year 1988 has been a significant, rewarding, and exciting period for Lawrence Livermore National Laboratory's nuclear testing program. It was significant in that the Laboratory's new director chose to focus strongly on the program's activities and to commit to a revitalized emphasis on testing and the experimental science that underlies it. It was rewarding in that revolutionary new measurement techniques were fielded on recent important and highly complicated underground nuclear tests with truly incredible results. And it was exciting in that the sophisticated and fundamental problems of weapons science that are now being addressed experimentally are yielding new challenges and understanding in ways that stimulate and reward the brightest and best of scientists. During FY88 the program was reorganized to emphasize our commitment to experimental science. The name of the program was changed to reflect this commitment, becoming the Nuclear Test-Experimental Science (NTES) Program.

Struble, G.L.; Donohue, M.L.; Bucciarelli, G.; Hymer, J.D.; Kirvel, R.D.; Middleton, C.; Prono, J.; Reid, S.; Strack, B. (eds.)

1988-01-01T23:59:59.000Z

179

Federal Geothermal Research Program Update Fiscal Year 1998  

SciTech Connect (OSTI)

This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

Keller, J.G.

1999-05-01T23:59:59.000Z

180

Federal Geothermal Research Program Update Fiscal Year 1999  

SciTech Connect (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

Not Available

2004-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Differences in intergender communication within task-oriented dyads  

E-Print Network [OSTI]

-eight undergraduates from Texas A&M University were used to compose these groups. There was no history of interaction between the partners prior to the experiments. The task conditions were randomly assigned to each dyad by a person other than the researcher in order...

McAfee, Joanna Lynn

1999-01-01T23:59:59.000Z

182

Hierarchical Distributed Task Allocation for Multi-Robot Exploration  

E-Print Network [OSTI]

the exploration process via a market-based mechanism. That is, each robot decides for itself whether it is moreHierarchical Distributed Task Allocation for Multi-Robot Exploration John Hawley and Zack Butler Abstract In order to more effectively explore a large unknown area, multiple robots may be employed to work

Butler, Zack

183

Report on Recommendations for Lab and Bench-Scale Tasks  

E-Print Network [OSTI]

Report on Recommendations for Lab and Bench-Scale Tasks Prepared for the U.S. Department of Energy) and the National Energy Technology Laboratory (NETL). In order to make this report more understandable thermodynamic efficiency of 100%. A recent EPRI study indicates that carbon fuel cells have the potential

184

FAQS Job Task Analyses- General Technical Base  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

185

FAQS Job Task Analyses- Technical Program Manager  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

186

FAQS Job Task Analyses- DOE Aviation Manager  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

187

FAQS Job Task Analyses- Quality Assurance  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

188

Office of Inspector General fiscal year 1996 annual work plan  

SciTech Connect (OSTI)

This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

NONE

1995-10-01T23:59:59.000Z

189

Forecast of Contracting and Subcontracting Opportunities, Fiscal year 1995  

SciTech Connect (OSTI)

Welcome to the US Department of Energy`s Forecast of Contracting and Subcontracting Opportunities. This forecast, which is published pursuant to Public Low 100--656, ``Business Opportunity Development Reform Act of 1988,`` is intended to inform small business concerns, including those owned and controlled by socially and economically disadvantaged individuals, and women-owned small business concerns, of the anticipated fiscal year 1995 contracting and subcontracting opportunities with the Department of Energy and its management and operating contractors and environmental restoration and waste management contractors. This document will provide the small business contractor with advance notice of the Department`s procurement plans as they pertain to small, small disadvantaged and women-owned small business concerns.Opportunities contained in the forecast support the mission of the Department, to serve as advocate for the notion`s energy production, regulation, demonstration, conservation, reserve maintenance, nuclear weapons and defense research, development and testing, when it is a national priority. The Department`s responsibilities include long-term, high-risk research and development of energy technology, the marketing of Federal power, and maintenance of a central energy data collection and analysis program. A key mission for the Department is to identify and reduce risks, as well as manage waste at more than 100 sites in 34 states and territories, where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. Each fiscal year, the Department establishes contracting goals to increase contracts to small business concerns and meet our mission objectives.

Not Available

1995-02-01T23:59:59.000Z

190

LLNL Underground Coal Gasification Project annual report - fiscal year 1984  

SciTech Connect (OSTI)

The Laboratory has been conducting an interdisciplinary underground coal gasification program since 1974 under the sponsorship of DOE and its predecessors. We completed three UCG tests at the Hoe Creek site near Gillette, Wyoming, during the period 1975 to 1979. Five small field experiments, the large-block tests, were completed from 1981 to 1982 at the exposed coal face in the WIDCO coal mine near Centralia, Washington. A larger test at the same location, the partial-seam CRIP test, was completed during fiscal year 1984. In conjunction with the DOE and an industrial group lead by the Gas Research Institute, we have prepared a preliminary design for a large-scale test at the WIDCO site. The planned test features dual injection and production wells, module interaction, and consumption of 20,000 tons of coal during a hundred-day steam-oxygen gasification. During fiscal year 1984, we documented the large-block excavations. The cavities were elongated, the cavity cross sections were elliptical, and the cavities contained ash and slag at the bottom, char and dried coal above that, and a void at the top. The results from the large-block tests provided enough data to allow us to construct a composite model, CAVSM. Preliminary results from the model agree well with the product-gas chemistry and cavity shape observed in the large-block tests. Other models and techniques developed during the year include a transient, moving-front code, a two-dimensional, reactive-flow code using the method of lines, and a wall-recession-rate model. In addition, we measured the rate of methane decomposition in the hot char bed and developed an engineering rate expression to estimate the magnitude of the methane-decomposition reaction. 16 refs., 30 figs., 1 tab.

Stephens, D.R.; O'Neal, E.M. (eds.)

1985-06-15T23:59:59.000Z

191

300 Area D4 Project Fiscal Year 2009 Building Completion Report  

SciTech Connect (OSTI)

This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

B. J. Skwarek

2010-01-27T23:59:59.000Z

192

Assessment of Food Chain Pathway Parameters in Biosphere Models: Annual Progress Report for Fiscal Year 2004  

SciTech Connect (OSTI)

This Annual Progress Report describes the work performed and summarizes some of the key observations to date on the U.S. Nuclear Regulatory Commission’s project Assessment of Food Chain Pathway Parameters in Biosphere Models, which was established to assess and evaluate a number of key parameters used in the food-chain models used in performance assessments of radioactive waste disposal facilities. Section 2 of this report describes activities undertaken to collect samples of soils from three regions of the United States, the Southeast, Northwest, and Southwest, and perform analyses to characterize their physical and chemical properties. Section 3 summarizes information gathered regarding agricultural practices and common and unusual crops grown in each of these three areas. Section 4 describes progress in studying radionuclide uptake in several representative crops from the three soil types in controlled laboratory conditions. Section 5 describes a range of international coordination activities undertaken by Project staff in order to support the underlying data needs of the Project. Section 6 provides a very brief summary of the status of the GENII Version 2 computer program, which is a “client” of the types of data being generated by the Project, and for which the Project will be providing training to the US NRC staff in the coming Fiscal Year. Several appendices provide additional supporting information.

Napier, Bruce A.; Krupka, Kenneth M.; Fellows, Robert J.; Cataldo, Dominic A.; Valenta, Michelle M.; Gilmore, Tyler J.

2004-12-02T23:59:59.000Z

193

Task Group 9 Update (Presentation)  

SciTech Connect (OSTI)

This presentation is a brief update of IEC TC82 QA Task Force, Group 9. Presented is an outline of the recently submitted New Work Item Proposal (NWIP) for a Comparative Thermal Cycling Test for CPV Modules to Differentiate Thermal Fatigue Durability.

Bosco, N.

2014-04-01T23:59:59.000Z

194

The effects of temperature, clothing and task on job performance and worker satisfaction  

E-Print Network [OSTI]

Manipulation Checks . Hypothesis I: Temperature x Clothing Interaction for Job Performance . V111 1X 10 10 12 16 16 16 16 17 17 18 20 20 21 Hypothesis II: Temperature x Task x Clothing Interaction for Job Performance. Hypothes1s III... research has been performed in order to determine the effects of task complexity under differing temperature and clothing conditions. For the most part, it has been assumed that performance on complex tasks would be affected most greatly by unfavorable...

Vickroy, Stephen Christopher

1980-01-01T23:59:59.000Z

195

Randomized Multi-Modal Motion Planning for a Humanoid Robot Manipulation Task  

E-Print Network [OSTI]

-chain constraint on the robot's motion. In order to unify these disparate application domains, there is a needRandomized Multi-Modal Motion Planning for a Humanoid Robot Manipulation Task Kris Hauser Victor Ng-Thow-Hing February 3, 2011 Abstract Robots that perform complex manipulation tasks must be able to generate

Indiana University

196

A comparison of visual cuing methods in large displays during performance of a secondary task  

E-Print Network [OSTI]

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Large Displays. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Secondary Tasks. ~ ~ . ~ . . . ~ ~ . ~ ~ ~ ~ ~ . . ~ . . . ~ . ~ ~ ~ III ' EXPERIMENTAL METHOD ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 17 19 Subjectse... button pushing task. In this study, a corresponding signal light was placed directly above each of eight pushbuttons mounted on a panel that could be moved in order to measure reach time for various reach distances. It was found that reach time does...

Rankin, John Edgar

1971-01-01T23:59:59.000Z

197

Annual Hanford Seismic Report for Fiscal Year 2010  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During FY 2010, the Hanford Seismic Network recorded 873 triggers on the seismometer system, which included 259 seismic events in the southeast Washington area and an additional 324 regional and teleseismic events. There were 210 events determined to be local earthquakes relevant to the Hanford Site. One hundred and fifty-five earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this fiscal year were a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al. 2009a, 2009b, 2009c, 2010a, 2010b, and 2010c). Most events were considered minor (coda-length magnitude [Mc] less than 1.0) with the largest event recorded on February 4, 2010 (3.0Mc). The estimated depths of the Wooded Island events are shallow (averaging approximately 1.5 km deep) placing the swarm within the Columbia River Basalt Group. Based upon the last two quarters (Q3 and Q4) data, activity at the Wooded Island area swarm has largely subsided. Pacific Northwest National Laboratory will continue to monitor for activity at this location. The highest-magnitude events (3.0Mc) were recorded on February 4, 2010 within the Wooded Island swarm (depth 2.4 km) and May 8, 2010 on or near the Saddle Mountain anticline (depth 3.0 km). This latter event is not considered unusual in that earthquakes have been previously recorded at this location, for example, in October 2006 (Rohay et al. 2007). With regard to the depth distribution, 173 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 18 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 19 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 178 earthquakes were located in known swarm areas, 4 earthquakes occurred on or near a geologic structure (Saddle Mountain anticline), and 28 earthquakes were classified as random events. The Hanford Strong Motion Accelerometer (SMA) network was triggered several times by the Wooded Island swarm events and the events located on or near the Saddle Mountain anticline. The maximum acceleration value recorded by the SMA network during fiscal year 2010 occurred February 4, 2010 (Wooded Island swarm event), approximately 2 times lower than the reportable action level for Hanford facilities (2% g) with no action required.

Rohay, Alan C.; Clayton, Ray E.; Sweeney, Mark D.; Devary, Joseph L.; Hartshorn, Donald C.

2010-12-27T23:59:59.000Z

198

Energy-Aware Task Partitioning on Heterogeneous Multiprocessor Platforms  

E-Print Network [OSTI]

Efficient task partitioning plays a crucial role in achieving high performance at multiprocessor plat forms. This paper addresses the problem of energy-aware static partitioning of periodic real-time tasks on heterogeneous multiprocessor platforms. A Particle Swarm Optimization variant based on Min-min technique for task partitioning is proposed. The proposed approach aims to minimize the overall energy consumption, meanwhile avoid deadline violations. An energy-aware cost function is proposed to be considered in the proposed approach. Extensive simulations and comparisons are conducted in order to validate the effectiveness of the proposed technique. The achieved results demonstrate that the proposed partitioning scheme significantly surpasses previous approaches in terms of both number of iterations and energy savings.

Saad, Elsayed; Shalan, Mohamed; Elewi, Abdullah

2012-01-01T23:59:59.000Z

199

Direct space-charge effects on the ILC damping rings: Task Force Report  

E-Print Network [OSTI]

Venturini, First-Order Space-Charge Tuneshift in a Linearly59511 February 2006 Direct Space Charge E?ects on the ILCof the Task Force on space charge. (A slightly reduced

Venturini, Marco; Oide, Katsunobu

2006-01-01T23:59:59.000Z

200

Menstrual cycle effects on spatial location tasks  

E-Print Network [OSTI]

The relationship between menstrual cycle hormones and performance on gender-linked spatial tasks was examined in college women. Healthy women and men over the age of 18 and not taking hormonal preparations completed tasks that typically show a male...

Andrew, Sarah

2013-02-22T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Interim Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada, for Fiscal Years 2012 and 2013  

SciTech Connect (OSTI)

This letter report documents interim activities that have been completed at CAU 114 in fiscal years 2012 and 2013.

Silvas, A J

2013-10-24T23:59:59.000Z

202

Nuclear Radiological Threat Task Force Established | National...  

National Nuclear Security Administration (NNSA)

Radiological Threat Task Force Established | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

203

NREL Job Task Analysis: Crew Leader  

SciTech Connect (OSTI)

A summary of job task analyses for the position of crew leader when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

204

Fiscal year 1999 Battelle performance evaluation and fee agreement  

SciTech Connect (OSTI)

Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

DAVIS, T.L.

1998-10-22T23:59:59.000Z

205

First Quarter Hanford Seismic Report for Fiscal Year 2009  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. This includes three recently acquired Transportable Array stations located at Cold Creek, Didier Farms, and Phinney Hill. For the Hanford Seismic Network, ten local earthquakes were recorded during the first quarter of fiscal year 2009. All earthquakes were considered as “minor” with magnitudes (Mc) less than 1.0. Two earthquakes were located at shallow depths (less than 4 km), most likely in the Columbia River basalts; five earthquakes at intermediate depths (between 4 and 9 km), most likely in the sub-basalt sediments); and three earthquakes were located at depths greater than 9 km, within the basement. Geographically, four earthquakes occurred in known swarm areas and six earthquakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2009-03-15T23:59:59.000Z

206

Advanced Automotive Technologies annual report to Congress, fiscal year 1996  

SciTech Connect (OSTI)

This annual report serves to inform the United States Congress on the progress for fiscal year 1996 of programs under the Department of Energy`s Office of Advanced Automotive Technologies (OAAT). This document complies with the legislative requirement to report on the implementation of Title III of the Automotive Propulsion Research and Development Act of 1978. Also reported are related activities performed under subsequent relevant legislation without specific reporting requirements. Furthermore, this report serves as a vital means of communication from the Department to all public and private sector participants. Specific requirements that are addressed in this report are: Discussion of how each research and development contract, grant, or project funded under the authority of this Act satisfies the requirements of each subsection; Current comprehensive program definition for implementing Title III; Evaluation of the state of automotive propulsion system research and development in the United States; Number and amount of contracts and grants awarded under Title III; Analysis of the progress made in developing advanced automotive propulsion system technology; and Suggestions for improvements in automotive propulsion system research and development, including recommendations for legislation.

NONE

1998-03-01T23:59:59.000Z

207

Abstracts of Phase 1 awards, (fiscal year) 1987  

SciTech Connect (OSTI)

Contained in this booklet are abstracts of the Phase I awards made in Fiscal Year 1987 under the Small Business Innovation Research (SBIR) program in the Department of Energy (DOE). The program is designed for implementation in a three-phase process, with Phase I determining the scientific or technical merit and feasibility of ideas proposed for investigation. The period of performance in this initial phase is relatively brief, typically about 6 months, and the awards are limited to $50,000. Phase II is the principal research or research and development effort, and the awards are as high as $500,000 for work to be performed in periods of up to 2 years. Phase III is the commercial application. The 111 Phase I projects described were selected in a highly competitive process from a total of 942 proposals received in response to the 1987 Solicitation. They cover the fields of chemistry, materials, control systems, plant natural products, instrumentation, nuclear medicine, health and environmental effects, high energy physics, particle accelerators, nuclear physics, plasma diagnostics and confinement, fusion energy systems, robotics and remote systems, nuclear reactors, space nuclear power, fuel cycle, decontamination/decommissioning, commputers in nuclear plants, coal, enhanced oil recovery/tar sands, fossil energy, photovoltaics, solar thermal, ceramics for heat engines, and industrial separation, conversion and recovery processes. (DLC)

Not Available

1987-01-01T23:59:59.000Z

208

First Quarter Hanford Seismic Report for Fiscal Year 1999  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. They also locate and identify sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consists of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the first quarter of FY99 for stations in the HSN was 99.8%. There were 121 triggers during the first quarter of fiscal year 1999. Fourteen triggers were local earthquakes; seven (50%) were in the Columbia River Basalt Group, no earthquakes occurred in the pre-basalt sediments, and seven (50%) were in the crystalline basement. One earthquake (7%) occurred near or along the Horn Rapids anticline, seven earthquakes (50%) occurred in a known swarm area, and six earthquakes (43%) were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometer during the first quarter of FY99.

DC Hartshorn; SP Reidel; AC Rohay

1999-05-26T23:59:59.000Z

209

Federal Geothermal Research Program Update Fiscal Year 2003  

SciTech Connect (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

Not Available

2004-03-01T23:59:59.000Z

210

Federal Geothermal Research Program Update Fiscal Year 2002  

SciTech Connect (OSTI)

The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

Not Available

2003-09-01T23:59:59.000Z

211

Fusion Safety Program annual report, fiscal year 1992  

SciTech Connect (OSTI)

This report summarizes the major activities of the Fusion Safety Program in fiscal year 1992. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and EG&G Idaho, Inc. is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations including the Westinghouse Hanford Company at the Hanford Engineering Development Laboratory, the Massachusetts Institute of Technology, and the University of Wisconsin. The technical areas covered in the report include tritium safety, activation product release, reactions involving beryllium, reactions involving lithium breeding materials, safety of fusion magnet systems, plasma disruptions, risk assessment failure rate data base, and computer code development for reactor transients. Also included in the report is a summary of the safety and environmental studies performed by the INEL for the Tokamak Physics Experiments and the Tokamak Fusion Test Reactor, the safety analysis for the International Thermonuclear Experimental Reactor design, and the technical support for the ARIES commercial reactor design study.

Holland, D.F.; Cadwallader, L.C.; Herring, J.S.; Longhurst, G.R.; McCarthy, K.A.; Merrill, B.J.; Piet, S.J.

1993-01-01T23:59:59.000Z

212

Fusion Safety Program annual report, fiscal year 1992  

SciTech Connect (OSTI)

This report summarizes the major activities of the Fusion Safety Program in fiscal year 1992. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and EG G Idaho, Inc. is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations including the Westinghouse Hanford Company at the Hanford Engineering Development Laboratory, the Massachusetts Institute of Technology, and the University of Wisconsin. The technical areas covered in the report include tritium safety, activation product release, reactions involving beryllium, reactions involving lithium breeding materials, safety of fusion magnet systems, plasma disruptions, risk assessment failure rate data base, and computer code development for reactor transients. Also included in the report is a summary of the safety and environmental studies performed by the INEL for the Tokamak Physics Experiments and the Tokamak Fusion Test Reactor, the safety analysis for the International Thermonuclear Experimental Reactor design, and the technical support for the ARIES commercial reactor design study.

Holland, D.F.; Cadwallader, L.C.; Herring, J.S.; Longhurst, G.R.; McCarthy, K.A.; Merrill, B.J.; Piet, S.J.

1993-01-01T23:59:59.000Z

213

Multiple systems or task complexity 1 Running head: Multiple systems or task complexity  

E-Print Network [OSTI]

Multiple systems or task complexity 1 Running head: Multiple systems or task complexity Procedural memory effects in categorization: evidence for multiple systems or task complexity? Safa R. Zaki and Dave College Williamstown, MA 10267 413-597-4594 Email: szaki@williams.edu #12;Multiple systems or task

Stoiciu, Mihai

214

Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

Bechtel Nevada

2005-03-01T23:59:59.000Z

215

E-Print Network 3.0 - assessment doe order Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to students as soon as possible after the student has completed the assessment task in order... 5 QUEEN'S UNIVERSITY BELFAST University Assessment Policy 1. Introduction ......

216

Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...  

Office of Environmental Management (EM)

Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland...

217

Annual Report of the Integrated Status and Effectiveness Monitoring Program: Fiscal Year 2008  

SciTech Connect (OSTI)

This document was created as an annual report detailing the accomplishments of the Integrated Status and Effectiveness Monitoring Program (ISEMP) in the Upper Columbia Basin in fiscal year 2008. The report consists of sub-chapters that reflect the various components of the program. Chapter 1 presents a report on programmatic coordination and accomplishments, and Chapters 2 through 4 provide a review of how ISEMP has progressed during the 2008 fiscal year in each of the pilot project subbasins: the John Day (Chapter 2), Wenatchee/Entiat (Chapter 3) and Salmon River (Chapter 4). Chapter 5 presents a report on the data management accomplishments in 2008.

Terraqua, Inc. (Wauconda, WA)

2009-07-20T23:59:59.000Z

218

Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6  

SciTech Connect (OSTI)

In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

NONE

1995-08-01T23:59:59.000Z

219

Hanford Site groundwater monitoring for fiscal year 1996  

SciTech Connect (OSTI)

This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1996 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that affected groundwater quality on the site. Characterization and monitoring of the vadose zone during FY 1996 comprised primarily spectral gamma logging, soil-gas monitoring, and electrical resistivity tomography. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1995 and June 1996. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Smaller plumes of strontium-90, technetium-99, and plutonium also were present at levels above the U.S. Environmental Protection Agency or State of Washington interim drinking water standards. Uranium concentrations greater than the proposed drinking water standard were also observed. Nitrate, fluoride, chromium, carbon tetrachloride, chloroform, trichloroethylene, and cis-1,2-dichlomethylene were present in groundwater samples at levels above their U.S. Environmental Protection Agency or State of Washington maximum contaminant levels. The nitrate plume is the most extensive. Three-dimensional, numerical, groundwater models were applied to the Hanford Site to predict contaminant-flow paths and the impact of operational changes on site groundwater conditions. Other models were applied to assess the performance of three separate pump-and-treat systems.

Hartman, M.J.; Dresel, P.E.; Borghese, J.V. [eds.] [and others] [eds.; and others

1997-02-01T23:59:59.000Z

220

Second Quarter Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, seven local earthquakes were recorded during the second quarter of fiscal year 2008. The largest event recorded by the network during the second quarter (February 3, 2008 - magnitude 2.3 Mc) was located northeast of Richland in Franklin County at a depth of 22.5 km. With regard to the depth distribution, two earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), three earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and two earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, five earthquakes occurred in swarm areas and two earthquakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-06-26T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

First Quarter Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, forty-four local earthquakes were recorded during the first quarter of fiscal year 2008. A total of thirty-one micro earthquakes were recorded within the Rattlesnake Mountain swarm area at depths in the 5-8 km range, most likely within the pre-basalt sediments. The largest event recorded by the network during the first quarter (November 25, 2007 - magnitude 1.5 Mc) was located within this swarm area at a depth of 4.3 km. With regard to the depth distribution, three earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), thirty-six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and five earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, thirty-eight earthquakes occurred in swarm areas and six earth¬quakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-03-21T23:59:59.000Z

222

Third Quarter Hanford Seismic Report for Fiscal Year 2005  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. For the Hanford Seismic Network, there were 337 triggers during the third quarter of fiscal year 2005. Of these triggers, 20 were earthquakes within the Hanford Seismic Network. The largest earthquake within the Hanford Seismic Network was a magnitude 1.3 event May 25 near Vantage, Washington. During the third quarter, stratigraphically 17 (85%) events occurred in the Columbia River basalt (approximately 0-5 km), no events in the pre-basalt sediments (approximately 5-10 km), and three (15%) in the crystalline basement (approximately 10-25 km). During the first quarter, geographically five (20%) earthquakes occurred in swarm areas, 10 (50%) earthquakes were associated with a major geologic structure, and 5 (25%) were classified as random events.

Reidel, Steve P.; Rohay, Alan C.; Hartshorn, Donald C.; Clayton, Ray E.; Sweeney, Mark D.

2005-09-01T23:59:59.000Z

223

First quarter Hanford seismic report for fiscal year 2000  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the US Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The HSN uses 21 sites and the EW uses 36 sites; both networks share 16 sites. The networks have 46 combined data channels because Gable Butte and Frenchman Hills East are three-component sites. The reconfiguration of the telemetry and recording systems was completed during the first quarter. All leased telephone lines have been eliminated and radio telemetry is now used exclusively. For the HSN, there were 311 triggers on two parallel detection and recording systems during the first quarter of fiscal year (FY) 2000. Twelve seismic events were located by the Hanford Seismic Network within the reporting region of 46--47{degree}N latitude and 119--120{degree}W longitude; 2 were earthquakes in the Columbia River Basalt Group, 3 were earthquakes in the pre-basalt sediments, 9 were earthquakes in the crystalline basement, and 1 was a quarry blast. Two earthquakes appear to be related to a major geologic structure, no earthquakes occurred in known swarm areas, and 9 earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the first quarter of FY 2000.

DC Hartshorn; SP Reidel; AC Rohay

2000-02-23T23:59:59.000Z

224

Third Quarter Hanford Seismic Report for Fiscal Year 2000  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its con-tractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (E WRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The HSN uses 21 sites and the EWRN uses 36 sites; both networks share 16 sites. The networks have 46 combined data channels because Gable Butte and Frenchman Hills East are three-component sites. The reconfiguration of the telemetry and recording systems was completed during the first quarter. All leased telephone lines have been eliminated and radio telemetry is now used exclusively. For the HSN, there were 818 triggers on two parallel detection and recording systems during the third quarter of fiscal year (FY) 2000. Thirteen seismic events were located by the Hanford Seismic Network within the reporting region of 46-47{degree} N latitude and 119-120{degree} W longitude; 7 were earthquakes in the Columbia River Basalt Group, 1 was an earthquake in the pre-basalt sediments, and 5 were earthquakes in the crystalline basement. Three earthquakes occurred in known swarm areas, and 10 earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the third quarter of FY 2000.

DC Hartshorn; SP Reidel; AC Rohay

2000-09-01T23:59:59.000Z

225

Second Quarter Hanford Seismic Report for Fiscal Year 2000  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the US Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The HSN uses 21 sites and the EWRN uses 36 sites; both networks share 16 sites. The networks have 46 combined data channels because Gable Butte and Frenchman Hills East are three-component sites. The reconfiguration of the telemetry and recording systems was completed during the first quarter. All leased telephone lines have been eliminated and radio telemetry is now used exclusively. For the HSN, there were 506 triggers on two parallel detection and recording systems during the second quarter of fiscal year (FY) 2000. Twenty-seven seismic events were located by the Hanford Seismic Network within the reporting region of 46--47{degree} N latitude and 119--120{degree} W longitude; 12 were earthquakes in the Columbia River Basalt Group, 2 were earthquakes in the pre-basalt sediments, 9 were earthquakes in the crystalline basement, and 5 were quarry blasts. Three earthquakes appear to be related to geologic structures, eleven earthquakes occurred in known swarm areas, and seven earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the second quarter of FY 2000.

DC Hartshorn; SP Reidel; AC Rohay

2000-07-17T23:59:59.000Z

226

First Quarter Hanford Seismic Report for Fiscal Year 2001  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. For the HSN, there were 477 triggers during the first quarter of fiscal year (FY) 2001 on the data acquisition system. Of these triggers, 176 were earthquakes. Forty-five earthquakes were located in the HSN area; 1 earthquake occurred in the Columbia River Basalt Group, 43 were earthquakes in the pre-basalt sediments, and 1 was earthquakes in the crystalline basement. Geographically, 44 earthquakes occurred in swarm areas, 1 earthquake was on a major structure, and no earthquakes were classified as random occurrences. The Horse Heaven Hills earthquake swarm area recorded all but one event during the first quarter of FY 2001. The peak of the activity occurred over December 12th, 13th, and 14th when 35 events occurred. No earthquakes triggered the Hanford Strong Motion Accelerometers during the first quarter of FY 2001.

Hartshorn, Donald C.; Reidel, Stephen P.; Rohay, Alan C.; Valenta, Michelle M.

2001-02-27T23:59:59.000Z

227

Hanford Cultural Resources Laboratory annual report for fiscal year 1992  

SciTech Connect (OSTI)

The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Field Office (RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site located in southcentral Washington, in a manner consistent with the National Historic Preservation Act Amended 1992 (NBPA), the Archaeological Resources Protection Act of 1979 (ARPA), the Native American Grave Protection and Repatriation Act of 1990 (NAGPRA), and the American Indian Religious Freedom Act of 1978 (AIRFA). The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the RL in compliance with federal statutes, regulations, and guidelines. For FY 1992, these tasks were to (1) ensure compliance with NBPA Section 106, (2) monitor the condition of known archaeological sites, (3) evaluate cultural resources for potential nomination to the National Register of Historic Places, (4) educate the public about cultural resources, and (5) conduct a sample archaeological survey of Hanford lands. Research was also conducted as a spin-off of these tasks and is also reported here.

Chatters, J.C.; Gard, H.A.; Wright, M.K.; Crist, M.E.; Longenecker, J.G.; O`Neil, T.K.; Dawson, M.V.

1993-06-01T23:59:59.000Z

228

Hanford Cultural Resources Laboratory annual report for fiscal year 1993  

SciTech Connect (OSTI)

The Hanford Cultural Resources Laboratory (HCRL) was established by the US Department of Energy, Richland Operations Office (DOE-RL) in 1987 as part of Pacific Northwest Laboratory (PNL). The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, consistent with the National Historic Preservation Act of 1966 (NHPA), the Archaeological Resources Protection Agency of 1979, the Native American Grave Protection and Repatriation Act of 1990, and the American Indian Religious Freedom Act of 1978. The HCRL responsibilities have been set forth in the Hanford Cultural Resources Management Plan as a prioritized list of tasks to be undertaken to keep the DOE-RL in compliance with federal statutes, regulations, and guidelines. For FY 1993, these tasks were to: conduct cultural resource reviews pursuant to Section 106 of the NHPA; monitor the condition of known historic properties; identify, recover, and inventory artifacts collected from the Hanford Site; educate the public about cultural resources values and the laws written to protect them; conduct surveys of the Hanford Site in accordance with Section 110 of the NHPA. Research also was conducted as a spin-off of these tasks and is reported here.

Last, G.V.; Wright, M.K.; Crist, M.E.; Cadoret, N.A.; Dawson, M.V.; Simmons, K.A.; Harvey, D.W.; Longenecker, J.G.

1994-09-01T23:59:59.000Z

229

JV Task 120 - Coal Ash Resources Research Consortium Research  

SciTech Connect (OSTI)

The Coal Ash Resources Research Consortium{reg_sign} (CARRC{reg_sign}, pronounced 'cars') is the core coal combustion product (CCP) research group at the Energy & Environmental Research Center (EERC). CARRC focuses on performing fundamental and applied scientific and engineering research emphasizing the environmentally safe, economical use of CCPs. CARRC member organizations, which include utilities and marketers, are key to developing industry-driven research in the area of CCP utilization and ensuring its successful application. The U.S. Department of Energy is a partner in CARRC through the EERC Jointly Sponsored Research Program, which provides matching funds for industrial member contributions and facilitates an increased level of effort in CARRC. CARRC tasks were designed to provide information on CCP performance, including environmental performance, engineering performance, favorable economics, and improved life cycle of products and projects. CARRC technical research tasks are developed based on member input and prioritization. CARRC special projects are developed with members and nonmembers to provide similar information and to support activities, including the assembly and interpretation of data, support for standards development and technology transfer, and facilitating product development and testing. CARRC activities from 2007 to 2009 included a range of research tasks, with primary work performed in laboratory tasks developed to answer specific questions or evaluate important fundamental properties of CCPs. The tasks were included in four categories: (1) Environmental Evaluations of CCPs; (2) Evaluation of Impacts on CCPs from Emission Controls; (3) Construction and Product-Related Activities; and (4) Technology Transfer and Maintenance Tasks. All tasks are designed to work toward achieving the CARRC overall goal and supporting objectives. The various tasks are coordinated in order to provide broad and useful technical data for CARRC members. Special projects provide an opportunity for non-CARRC members to sponsor specific research or technology transfer consistent with CARRC goals. This report covers CARRC activities from January 2007 through March 2009. These activities have been reported in CARRC Annual Reports and in member meetings over the past 2 years. CARRC continues to work with industry and various government agencies with its research, development, demonstration, and promotional activities nearing completion at the time of submission of this report. CARRC expects to continue its service to the coal ash industry in 2009 and beyond to work toward the common goal of advancing coal ash utilization by solving CCP-related technical issues and promoting the environmentally safe, technically sound, and economically viable management of these complex and changing materials.

Debra Pflughoeft-Hassett; Loreal Heebink; David Hassett; Bruce Dockter; Kurt Eylands; Tera Buckley; Erick Zacher

2009-03-28T23:59:59.000Z

230

Solving the viscous hydrodynamics order by order  

E-Print Network [OSTI]

In this paper, we propose a method of solving the viscous hydrodynamics order by order in a derivative expansion. In such method, the zero order solution is just the one of the ideal hydrodynamics. All the other higher order corrections satisfy the same first-order partial differential equations but with different inhomogeneous terms. We therefore argue that our method could be easily extended to any orders. The problem of causality and stability will be released if the gradient expansion is guaranteed. This method might be of great help to both theoretical and numerical calculations of relativistic hydrodynamics.

Jian-Hua Gao; Shi Pu

2014-09-02T23:59:59.000Z

231

NREL Job Task Analysis: Energy Auditor  

SciTech Connect (OSTI)

A summary of job task analyses for the position of energy auditor when evaluating a residence before and during weatherization work.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

232

Interagency Energy Management Task Force Members  

Broader source: Energy.gov [DOE]

The Interagency Energy Management Task Force is led by the Federal Energy Management Program director. Members include energy and sustainability managers from federal agencies.

233

NREL Job Task Analysis: Quality Control Inspector  

SciTech Connect (OSTI)

A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence.

Kurnik, C.; Woodley, C.

2011-05-01T23:59:59.000Z

234

Document prepared by APIC Bioterrorism Task Force  

E-Print Network [OSTI]

ATTACHMENT Document prepared by APIC Bioterrorism Task Force Judith F. English, Mae Y. Cundiff of civilian populations not recommended. 3. Infection Control Practices for Patient Management Symptomatic

Oliver, Douglas L.

235

Performance assessment task team progress report  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Headquarters EM-35, established a Performance Assessment Task Team (referred to as the Team) to integrate the activities of the sites that are preparing performance assessments (PAs) for disposal of new low-level waste, as required by Chapter III of DOE Order 5820.2A, {open_quotes}Low-Level Waste Management{close_quotes}. The intent of the Team is to achieve a degree of consistency among these PAs as the analyses proceed at the disposal sites. The Team`s purpose is to recommend policy and guidance to the DOE on issues that impact the PAs, including release scenarios and parameters, so that the approaches are as consistent as possible across the DOE complex. The Team has identified issues requiring attention and developed discussion papers for those issues. Some issues have been completed, and the recommendations are provided in this document. Other issues are still being discussed, and the status summaries are provided in this document. A major initiative was to establish a subteam to develop a set of test scenarios and parameters for benchmarking codes in use at the various sites. The activities of the Team are reported here through December 1993.

Wood, D.E.; Curl, R.U.; Armstrong, D.R.; Cook, J.R.; Dolenc, M.R.; Kocher, D.C.; Owens, K.W.; Regnier, E.P.; Roles, G.W.; Seitz, R.R. [and others

1994-05-01T23:59:59.000Z

236

CIVIL ENGINEERING ACADEMY FUND FISCAL YEAR 2002 ACCOUNT NUMBER 4360-44-5897  

E-Print Network [OSTI]

CIVIL ENGINEERING ACADEMY FUND FISCAL YEAR 2002 ACCOUNT NUMBER 4360-44-5897 Fund Balance 09/28/03) REVENUES YEAR TO DATE (FY 2003) LESS EXPENDITURES Welch's Jewelry & Awards - Plaques for Academy Inductees United Supermarket - Academy Continental Breakfast 4/5/03 Postal Mailing Services Balance as of 04

Gelfond, Michael

237

Fiscal Year 2007 Annual Report Integrated Ocean Drilling Program U.S. Implementing Organization  

E-Print Network [OSTI]

INDIAN OCEAN PACIFIC OCEAN ATLANTIC OCEAN ARCTIC OCEAN SOUTHERN OCEAN 0° 120°E 150° 87°30' 88°00' N M0001Fiscal Year 2007 Annual Report Integrated Ocean Drilling Program · U.S. Implementing Organization­M0004 180° ESO USIO IODP Phase 1 Drill Sites, Expeditions 301­312 #12;Integrated Ocean Drilling

238

Contract 98, Appendix F self-assessment report for Fiscal Year 2003  

SciTech Connect (OSTI)

This report summarizes the Ernest Orlando Lawrence Berkeley National Laboratory internal assessment of Laboratory operational and administrative performance in key support functions for Fiscal Year (FY) 2003. The report provides documentation of ongoing performance-based management and oversight processes required by the Department of Energy (DOE) to monitor, measure, and evaluate Berkeley Lab work.

Albert (Editor), Rich

2003-10-15T23:59:59.000Z

239

Director's Discretionary Research and Development Program: Annual Report, Fiscal Year 2006  

SciTech Connect (OSTI)

The Director's Discretionary Research and Development Program, Annual Report Fiscal Year 2006 is an annual management report that summarizes research projects funded by the DDRD program. The NREL DDRD program comprises projects that strengthen NREL's four technical competencies: Integrated Systems, Renewable Electricity, Renewable Fuels, and Strategic Analysis.

Not Available

2007-03-01T23:59:59.000Z

240

Tax and Fiscal Policies for Promotion of Industrial EnergyEfficiency: A Survey of International Experience  

SciTech Connect (OSTI)

The Energy Foundation's China Sustainable Energy Program (CSEP) has undertaken a major project investigating fiscal and tax policy options for stimulating energy efficiency and renewable energy development in China. This report, which is part of the sectoral sub-project studies on energy efficiency in industry, surveys international experience with tax and fiscal policies directed toward increasing investments in energy efficiency in the industrial sector. The report begins with an overview of tax and fiscal policies, including descriptions and evaluations of programs that use energy or energy-related carbon dioxide (CO2) taxes, pollution levies, public benefit charges, grants or subsidies, subsidized audits, loans, tax relief for specific technologies, and tax relief as part of an energy or greenhouse gas (GHG) emission tax or agreement scheme. Following the discussion of these individual policies, the report reviews experience with integrated programs found in two countries as well as with GHG emissions trading programs. The report concludes with a discussion of the best practices related to international experience with tax and fiscal policies to encourage investment in energy efficiency in industry.

Price, Lynn; Galitsky, Christina; Sinton, Jonathan; Worrell,Ernst; Graus, Wina

2005-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2008 Activities and Achievements  

E-Print Network [OSTI]

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2008 Activities--Institute for Telecommunication Sciences In response to the: Technology Transfer and Commercialization Act of 2000 (P.L. 106 (FY) 2008. At the Department of Commerce, technology transfer is a significant part of the mission

Perkins, Richard A.

242

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2011 Activities and Achievements  

E-Print Network [OSTI]

Annual Report on Technology Transfer: Approach and Plans, Fiscal Year 2011 Activities Pursuant to the Technology Transfer Commercialization Act of 2000 (Pub. L. 106-404) January 2012 #12;ii This page is intentionally left blank FOREWORD This report summarizes technology transfer activities

Perkins, Richard A.

243

Asignacin de terrenos fiscales para proyectos de generacin elctrica y su redefinicin como  

E-Print Network [OSTI]

Energía Eólica Superficie: 15.171 hectáreas Inversión aprox.: 7000 Millones US$ Plantas solares: Llano de Bienes Nacionales y Ministerio de Energía para reservar áreas para proyectos eólicos (2010, 2012 y 2013). Bases de procesos de licitación de terrenos fiscales para proyectos ERNC y de generación de energía

Dixon, Juan

244

Testimony Regarding Fiscal Year 2012 Funding for Federal Science and Technology Programs  

E-Print Network [OSTI]

necessary than ever. Federally-funded scientific research and development (R&D) produces innovationsTestimony Regarding Fiscal Year 2012 Funding for Federal Science and Technology Programs Submitted of delivering energy, food, and water in more sustainable ways. In short, NSF, NASA and NOAA help meet

245

Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Notice provides guidance for implementing the mandates of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, commonly referred to as the Bond Amendment. Extended until 9-28-11 by DOE N 251.90 dated 9-28-10. Canceled by DOE O 472.2. Does not cancel other directives.

2009-08-12T23:59:59.000Z

246

Economic Contributions of the State University System of Florida in Fiscal Year 2009-10  

E-Print Network [OSTI]

1 Economic Contributions of the State University System of Florida in Fiscal Year 2009-10 SponsoredD, Thomas J. Stevens, PhD, and Rodney L. Clouser, PhD University of Florida, Food & Resource Economics for Economic Forecasting and Analysis March 8, 2012 #12;2 Table of Contents Executive Summary

Florida, University of

247

Terms of Reference for NOAA Southeast Fisheries Science Center Fiscal Year 2014  

E-Print Network [OSTI]

to fishery stock assessment modeling? What is the suitability of the stock assessment models employed, taking1 Terms of Reference for NOAA Southeast Fisheries Science Center Fiscal Year 2014 Stock Assessment of this review is to examine and evaluate the Southeast Fisheries Science Center's (SEFSC) fishery stock

248

Fiscal Sustainability and Retirement Security: A Reform Proposal for the Illinois State Universities  

E-Print Network [OSTI]

situation: health care and retirement. First, Medicaid expenditures, already a substantial share of state1 Fiscal Sustainability and Retirement Security: A Reform Proposal for the Illinois State errors, are those of the authors alone. I.The Urgent Need for Reform Public pension reform is a national

Illinois at Chicago, University of

249

Performance and Fiscal Analysis of Distributed Sensor Networks in a Power Plant  

E-Print Network [OSTI]

Performance and Fiscal Analysis of Distributed Sensor Networks in a Power Plant Mitchell Colby University 204 Rogers Hall Corvallis, OR 97331 kagan.tumer@oregonstate.edu ABSTRACT As power plants become power plant, showing that system parameters may be accurately measured and tracked more effectively than

Tumer, Kagan

250

University Budget System Reports Training Guide Prepared by Budget Management and Fiscal Services  

E-Print Network [OSTI]

1 University Budget System Reports Training Guide Prepared by Budget Management and Fiscal Services 345 Strong Hall * 785-864-3136 http://www.budget.ku.edu/ budgetoffice@ku.edu Training Guide Last Updated: November 2010 Contents: I. Description of UBUD II. Budgets, Funds, Appropriations, Cost Centers

251

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an indepen dent

252

U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Fiscal Year 2002-2007 Strategic Plan Statement of the Chairman The U.S. Nuclear Waste Technical Review Board was established of Energy Mission The Board's mission, established in the Nuclear Waste Policy Amendments Act (NWPAA

253

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20042009  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2004­2009 (Revised March 2004) Statement of the Board The Nuclear Waste Policy Amendments Act of 1987 directed the U-level radioactive waste. The Act also established the U.S. Nuclear Waste Technical Review Board as an independent

254

U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 20032008  

E-Print Network [OSTI]

Appendix G Appendix G U.S. Nuclear Waste Technical Review Board Strategic Plan: Fiscal Years 2003­2008 Statement of the Chairman The Nuclear Waste Policy Amendments Act of 1987 directed the U.S. Department as the location of a permanent repository for dis posing of spent nuclear fuel and high-level radioactive waste

255

Third Quarter Hanford Seismic Report for Fiscal Year 2010  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 23 local earthquakes during the third quarter of FY 2010. Sixteen earthquakes were located at shallow depths (less than 4 km), five earthquakes at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments, and two earthquakes were located at depths greater than 9 km, within the basement. Geographically, twelve earthquakes were located in known swarm areas, 3 earthquakes occurred near a geologic structure (Saddle Mountain anticline), and eight earthquakes were classified as random events. The highest magnitude event (3.0 Mc) was recorded on May 8, 2010 at depth 3.0 km with epicenter located near the Saddle Mountain anticline. Later in the quarter (May 24 and June 28) two additional earthquakes were also recorded nearly at the same location. These events are not considered unusual in that earthquakes have been previously recorded at this location, for example, in October 2006 (Rohay et al; 2007). Six earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter were a continuation of the swarm events observed during the 2009 and 2010 fiscal years and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, 2010a, and 2010b). All events were considered minor (coda-length magnitude [Mc] less than 1.0) with a maximum depth estimated at 1.7 km. Based upon this quarters activity it is likely that the Wooded Island swarm has subsided. Pacific Northwest National Laboratory (PNNL) will continue to monitor for activity at this location.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2010-09-29T23:59:59.000Z

256

Annual Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During fiscal year 2008, the Hanford Seismic Network recorded 1431 triggers on the seismometer system, which included 112 seismic events in the southeast Washington area and an additional 422 regional and teleseismic events. There were 74 events determined to be local earthquakes relevant to the Hanford Site. The highest-magnitude event (3.7 Mc) occurred on May 18, 2008, and was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, 13 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 45 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 16 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 54 earthquakes were located in swarm areas and 20 earthquakes were classified as random events. The May 18 earthquake was the highest magnitude event recorded since 1975 in the vicinity of the Hanford Site (between 46 degrees and 47 degrees north latitude and 119 degrees and 120 degrees west longitude). The event was not reported as being felt on the Hanford Site or causing any damage and was communicated to the Pacific Northwest National Laboratory Operations Center per HSAP communi¬cations procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and 400 Area were triggered by the May 18 event. The maximum acceleration recorded at the SMA stations (0.17% at the 300 Area) was 12 times smaller than the reportable action level (2% g) for Hanford Site facilities.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-12-29T23:59:59.000Z

257

Third Quarter Hanford Seismic Report for Fiscal Year 2008  

SciTech Connect (OSTI)

The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, fourteen local earthquakes were recorded during the third quarter of fiscal year 2008. The largest event recorded by the network during the third quarter (May 18, 2008 - magnitude 3.7 Mc) was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, five earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and three earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, eight earthquakes occurred in swarm areas and six earthquakes were classified as random events. The largest event recorded by the network during the third quarter occurred on May 18 (magnitude 3.7 Mc) and was located approximately 17 km east of Prosser at a depth of 20.5 km. This earthquake was the highest magnitude event recorded in the 46-47 N. latitude / 119-120 W. longitude sector since 1975. The May 18 event, not reported as being felt on the Hanford site or causing any damage, was communicated to the PNNL Operations Center per HSAP communications procedures. The event is not considered to be significant with regard to site safety and not unprecedented given the site’s seismic history. The Hanford strong motion accelerometer (SMA) stations at the 200 East Area, 300 Area, and the 400 Area were triggered by the May 18 event. The reportable action level of 2% g for Hanford facilities is approximately 12 times larger than the peak acceleration (0.17%) observed at the 300 Area SMA station and no action was required.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2008-09-01T23:59:59.000Z

258

Fiscal year 1998 Battelle performance evaluation agreement revision 1  

SciTech Connect (OSTI)

Fiscal Year 1998 represents the second full year utilizing a results-oriented, performance-based contract. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractors performance for the period October 1, 1997 through September 30, 1998, as required by Articles entitled Use of Objective Standards of Performance, Self Assessment and Performance Evaluation and Critical Outcomes Review of the Contract DE-AC08-76RLO1830. In partnership with the Contractor and other key customers, the Department of Energy (DOE) Richland Operations Office has defined six critical outcomes that same as the core for the Contractors performance evaluation. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory. As stated above six critical outcomes have been established for FY 1998. These outcomes are based on the following needs identified by DOE-HQ, RL and other customers of the Laboratory. Our Energy Research customer desires relevant, quality and cost effective science. Our Environmental Management customer wants technology developed, demonstrated, and deployed to solve environmental cleanup issues. To ensure the diversification and viability of the Laboratory as a National asset, RL and HQ alike want to increase the Science and Technical contributions of PNNL related to its core capabilities. RL wants improved leadership/management, cost-effective operations, and maintenance of a work environment, which fosters innovative thinking and high morale. RL and HQ alike desire compliance with environment, safety and health (ES and H) standards and disciplined conduct of operations for protection of the worker, environment, and the public, As with all of Hanford, DOE expects contribution of the Laboratory to the economic development of the Tri-Cities community, and the region, to build a new local economy that is less reliant on the Hanford mission, as well as enhancing the status of the Laboratory as a valued corporate citizen of the Northwest Region. The Critical Outcome system focuses all of these customer desires into specific objectives and performance indicators, with supporting measures to track and foster continued improvement in meeting the needs (outcomes) of the Laboratory's customers.

DAVIS, T.L.

1998-10-22T23:59:59.000Z

259

Ecological Monitoring and Compliance Program Fiscal Year 2002 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.

C. A. Wills

2002-12-01T23:59:59.000Z

260

Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations  

SciTech Connect (OSTI)

The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report analyzes the retrieval testing issues and describes what has been learned and issues that need further resolution. As such, it can serve as a guide to additional testing that must be performed before the systems are used in-tank. The major issues discussed are tank access, deployment, mining strategy, waste retrieval, liquid scavenging (liquid usage), maneuverability, positioning, static and dynamic performance, remote operations, reliability, availability, maintenance, tank safety, and cost.

Berglin, E.J.

1998-02-05T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Muon Collider Task Force Report  

SciTech Connect (OSTI)

Muon Colliders offer a possible long term path to lepton-lepton collisions at center-of-mass energies {radical}s {ge} 1 TeV. In October 2006 the Muon Collider Task Force (MCTF) proposed a program of advanced accelerator R&D aimed at developing the Muon Collider concept. The proposed R&D program was motivated by progress on Muon Collider design in general, and in particular, by new ideas that have emerged on muon cooling channel design. The scope of the proposed MCTF R&D program includes muon collider design studies, helical cooling channel design and simulation, high temperature superconducting solenoid studies, an experimental program using beams to test cooling channel RF cavities and a 6D cooling demonstration channel. The first year of MCTF activities are summarized in this report together with a brief description of the anticipated FY08 R&D activities. In its first year the MCTF has made progress on (1) Muon Collider ring studies, (2) 6D cooling channel design and simulation studies with an emphasis on the HCC scheme, (3) beam preparations for the first HPRF cavity beam test, (4) preparations for an HCC four-coil test, (5) further development of the MANX experiment ideas and studies of the muon beam possibilities at Fermilab, (6) studies of how to integrate RF into an HCC in preparation for a component development program, and (7) HTS conductor and magnet studies to prepare for an evaluation of the prospects for of an HTS high-field solenoid build for a muon cooling channel.

Ankenbrandt, C.; Alexahin, Y.; Balbekov, V.; Barzi, E.; Bhat, C.; Broemmelsiek, D.; Bross, A.; Burov, A.; Drozhdin, A.; Finley, D.; Geer, S.; /Fermilab /Argonne /Brookhaven /Jefferson Lab /LBL, Berkeley /MUONS Inc., Batavia /UCLA /UC, Riverside /Mississippi U.

2007-12-01T23:59:59.000Z

262

Task and Machine Heterogeneities: Higher Moments Matter  

E-Print Network [OSTI]

Task and Machine Heterogeneities: Higher Moments Matter Abdulla M. Al-Qawasmeh 1 , Anthony A.potter}@colostate.edu jtsmith@digitalglobe.com Abstract - One type of heterogeneous computing (HC) systems consists of machines in this matrix represents the ETC of a specific task on a specific machine when executed exclusively. Heuristics

Maciejewski, Anthony A.

263

Water Conservation Task Force (2014 Charge)  

E-Print Network [OSTI]

Water Conservation Task Force (2014 Charge) The Task Force will advise the Chancellor and Campus Provost/Executive Vice Chancellor (CP/EVC) on current and past water use and provide recommendations on implementation of policies for potable water use reductions in support of The Regents Policy on Sustainable

California at Santa Cruz, University of

264

Sustainability Initiative Task Force Final Report  

E-Print Network [OSTI]

UW­Madison Sustainability Initiative Task Force Final Report October 2010 #12;We are pleased to present the final report of the campus Sustainability Task Force. This report fulfills the charge we gave to sustainability for consideration by UW­Madison's leadership and campus community. There are many reasons why

Sheridan, Jennifer

265

Task mapping for non-contiguous allocations.  

SciTech Connect (OSTI)

This paper examines task mapping algorithms for non-contiguously allocated parallel jobs. Several studies have shown that task placement affects job running time for both contiguously and non-contiguously allocated jobs. Traditionally, work on task mapping either uses a very general model where the job has an arbitrary communication pattern or assumes that jobs are allocated contiguously, making them completely isolated from each other. A middle ground between these two cases is the mapping problem for non-contiguous jobs having a specific communication pattern. We propose several task mapping algorithms for jobs with a stencil communication pattern and evaluate them using experiments and simulations. Our strategies improve the running time of a MiniApp by as much as 30% over a baseline strategy. Furthermore, this improvement increases markedly with the job size, demonstrating the importance of task mapping as systems grow toward exascale.

Leung, Vitus Joseph; Bunde, David P. [Knox College, Galesburg, IL; Ebbers, Johnathan [Knox College, Galesburg, IL; Price, Nicholas W. [Knox College, Galesburg, IL; Swank, Matthew [Knox College, Galesburg, IL; Feer, Stefan P. [3M Health Information Systems, Inc., Wallingford, CT; Rhodes, Zachary D. [Allstate Corporation, Northbrook, IL

2013-02-01T23:59:59.000Z

266

Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1  

SciTech Connect (OSTI)

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

Not Available

1994-12-01T23:59:59.000Z

267

An Autoethnography of a First-Time School District Superintendent: Complicated by Issues of Race, Gender and Persistent Fiscal Stress  

E-Print Network [OSTI]

schools that met schoolwide 2005-06 API growth targets butthan 3% reserve for the 2005-06 fiscal year. The HighlightsIn both 2004-05 and 2005-06, three elementary schools have

Dailey, Ardella Jones

2011-01-01T23:59:59.000Z

268

Effectiveness and Impacts of Ecological Fiscal Transfers and Payments for Environmental Services: A Case Study of Shengnongjia National Nature Reserve   

E-Print Network [OSTI]

.e. Ecological Fiscal Transfers (EFT) and Payments for Environmental Services (PES), in achieving conservation effectiveness and their economic and social impacts, through a case study on the Shengnongjia National Nature Reserve in China. It is found...

Li, Mingmei

2012-11-29T23:59:59.000Z

269

Paths toward the modern fiscal state : England (1642-1752), Japan (1868-1895), and China (1850-1911)  

E-Print Network [OSTI]

This dissertation examines the rise of the modem fiscal state, which enabled the state to use centrally collected revenues from indirect taxes to mobilize financial resources either through long-term borrowing or issuing ...

He, Wenkai

2007-01-01T23:59:59.000Z

270

Ecological Monitoring and Compliance Program Fiscal Year 2000 Report  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition ecoregion. Seventy bats, representing four bat species of concern, were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at selected tunnel and mine entrances verifying that some NTS mines and tunnels are used as bat roosts. Thirty-seven adult horses and 11 foals were counted this year. Four of the five foals observed last year have survived to yearlings. A monitoring plan for NTS horses was completed. Six active red-tailed hawk nests and 10 nestling red-tailed hawks were detected this year. Two spotlighting surveys for mule deer were conducted, each over three consecutive nights in October 1999 and August 2000. The mean sighting rate in October was 1.2 deer/10 kilometers (km) and 1.6 deer/10 km in August. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. Pahute Mesa Pond was confirmed to have vegetation,hydrology, and soil indicators that qualify the site as a jurisdictional wetland. The chemical spill test plan for one experiment at the HAZMAT Spill Center was reviewed for its potential to impact biota downwind of spills on Frenchman Lake playa.

Wills, C.A.

2000-12-01T23:59:59.000Z

271

Ecological Monitoring and Compliance Program Fiscal Year 2001  

SciTech Connect (OSTI)

The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A total of 55 juvenile owls was detected from 11 breeding pairs. Pellet analysis of burrowing owls was completed which identified key prey species. A total of 272 bats, representing 10 bat species were captured in mist-nets at water sources in the Great Basin Desert ecoregion. Bats were detected with the Anabat II call-recording system at water sources and selected tunnel and mine entrances. Thirty-seven adult horses and 11 foals were counted this year. Two of the eleven foals observed last year survived to yearlings. Seven active raptor nests were found and monitored this year. These included two Great-horned Owl nests, three Barn Owl nests, and two Red-tailed Hawk nests. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical spill test plans for four experiments at the HAZMAT Spill Center were reviewed for their potential to impact biota downwind of spills on Frenchman Lake playa.

C. A. Wills

2001-12-01T23:59:59.000Z

272

First Quarter Hanford Seismic Report for Fiscal Year 2010  

SciTech Connect (OSTI)

The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite interferometry that detected approximately 1 inch uplift in surface deformation along an east-west transect within the swarm area. The uplift is thought to be caused by the release of pressure that has built up in sedimentary layers, cracking the brittle basalt layers with the Columbia River Basalt Formation (CRBG) and causing the earthquakes. Similar earthquake swarms have been recorded near this same location in 1970, 1975 and 1988 but not with SMA readings or satellite imagery. Prior to the 1970s, swarming may have occurred, but equipment was not in place to record those events. The Wooded Island swarm, due its location and the limited magnitude of the events, does not appear to pose any significant risk to Hanford waste storage facilities. Since swarms of the past did not intensify in magnitude, seismologists do not expect that these events will persist or increase in intensity. However, Pacific Northwest National Laboratory (PNNL) will continue to monitor the activity. Outside of the Wooded Island swarm, sixteen earthquakes were recorded, all minor events. Seven earthquakes were located at intermediate depths (between 4 and 9 km), most likely in the pre-basalt sediments and nine earthquakes at depths greater than 9 km, within the basement. Geographically, seven earthquakes were located in known swarm areas and nine earthquakes were classified as random events.

Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

2010-03-29T23:59:59.000Z

273

Executive Order 13423: Strengthening Federal Environmental, Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

energy efficiency and reduce greenhouse gas emissions of the agency, through reduction of energy intensity by (i) 3 percent annually through the end of fiscal year 2015, or (ii) 30...

274

Publications Order Form Order by Mail  

E-Print Network [OSTI]

and Improving Nutrition and Growth of Western Forests Global Resources and Markets: Issues and Trends Mineral.00 $10.50 $5.00 $10.00 $35.00 $20.00 Quantity Total books Total $ $ $ $ $ $ $ $ $ $ $ $ $ $ Total Cost Washington State residents add sales tax of 9.0% Total Order with tax if applicable: Order Totals #12

Borenstein, Elhanan

275

Decentralized task allocation for dynamic environments  

E-Print Network [OSTI]

This thesis presents an overview of the design process for creating greedy decentralized task allocation algorithms and outlines the main decisions that progressed the algorithm through three different forms. The first ...

Johnson, Luke B

2012-01-01T23:59:59.000Z

276

Clinch River MRS Task Force Recommendations  

Broader source: Energy.gov [DOE]

The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the...

277

IEA Task 27 BUILDING ENVELOPE COMPONENTS  

E-Print Network [OSTI]

IEA Task 27 BUILDING ENVELOPE COMPONENTS Performance, durability and sustainability of advanced windows and solar components for building envelopes Energy Performance Assessment Methodology Starting................................................................................................................................................. 3 2 Concepts of Energy Performance Assessment of Building Envelopes

278

Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992  

SciTech Connect (OSTI)

This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.

Zaeh, R.A.

1993-04-01T23:59:59.000Z

279

Laboratory Directed Research and Development annual report, fiscal year 1997  

SciTech Connect (OSTI)

The Department of Energy Order 413.2(a) establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 413.2, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. DOE Order 413.2 requires that each laboratory submit an annual report on its LDRD activities to the cognizant Secretarial Officer through the appropriate Operations Office Manager. The report provided in this document represents Pacific Northwest National Laboratory`s LDRD report for FY 1997.

NONE

1998-03-01T23:59:59.000Z

280

THE GENERAL ATOMICS FUSION THEORY PROGRAM ANNUAL REPORT FOR FISCAL YEAR 2002  

SciTech Connect (OSTI)

OAK B202 THE GENERAL ATOMICS FUSION THEORY PROGRAM ANNUAL REPORT FOR FISCAL YEAR 2002. The dual objective of the fusion theory program at General Atomics (GA) is to significantly advance the scientific understanding of the physics of fusion plasmas and to support the DIII-D and other tokamak experiments. The program plan is aimed at contributing significantly to the Fusion Energy Science and the Tokamak Concept Improvement goals of the Office of Fusion Energy Sciences (OFES).

PROJECT STAFF

2002-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

300 Area D4 Project Fiscal Year 2008 Building Completion Report  

SciTech Connect (OSTI)

This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of eighteen buildings in the 300 Area of the Hanford Site that were demolished in Fiscal Year 2008. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.

R. A. Westberg

2009-01-15T23:59:59.000Z

282

Hanford Seismic Annual Report and Fourth Quarter Report for Fiscal Year 1999  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network. (EWRN) consist of 40 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. A major reconfiguration of the HSN was initiated at the end of this quarter and the results will be reported in the first quarter report for next fiscal year (FY2000). For the HSN, there were 390 triggers during the fourth quarter of fiscal year(FY) 1999 on the primary recording system. With the implementation of dual backup systems during the second quarter of the fiscal year and an overall increase observed in sensitivity, a total of 1632 triggers were examined, identified, and processed during this fiscal year. During the fourth quarter, 24 seismic events were located by the HSN within the reporting region of 46 degrees to 47 degrees north latitude and 119 degrees to 120 degrees west longitude 9 were earthquakes in the Columbia River Basalt Group, 2 were earthquakes in the pre-basalt sediments, 10 were earthquakes in the crystalline basement; and 2 were quarry blasts. One earthquake appears to be related to a major geologic structure, 14 earthquakes occurred in known swarm areas, and 7 earthquakes were random occurrences.

AC Rohay; DC Hartshorn; SP Reidel

1999-12-07T23:59:59.000Z

283

Fiscal Year 2014 Annual Report on BNLs Next Generation Safeguards Initiative Human Capital Development Activities  

SciTech Connect (OSTI)

Brookhaven National Laboratory’s (BNL’s) Nonproliferation and National Security Department contributes to the National Nuclear Security Administration Office of Nonproliferation and International Security Next Generation Safeguards Initiative (NGSI) through university engagement, safeguards internships, safeguards courses, professional development, recruitment, and other activities aimed at ensuring the next generation of international safeguards professionals is adequately prepared to support the U.S. safeguards mission. This report is a summary of BNL s work under the NGSI program in Fiscal Year 2014.

Pepper S. E.

2014-10-10T23:59:59.000Z

284

StreamNet Project : Annual Report Fiscal Year 2008.  

SciTech Connect (OSTI)

Fiscal Year 2008 (FY-08) represents a transitional year for the StreamNet project. While the project continued to acquire/update, standardize, georeference and disseminate fish-related data for the state, some tribal and one federal fisheries agencies, it also took on several new initiatives and is anticipating new regional guidance on data needs. Passage of the Columbia Basin Accords caused an administrative change within the project, separating the work done by the Columbia River Inter-Tribal Fish Commission (CRITFC) out to a separate contract with BPA. This will change the structure of the StreamNet contract but not change the relationship with the StreamNet Library or data developed by CRITFC, and will likely increase the availability of tribal data to StreamNet due to increased funding for tribal data efforts. This change will take effect in FY-09. We also expect that data work will be adjusted in the future in response to executive level policy direction in the Columbia Basin based on efforts to establish priorities under a regional data management framework. Data development emphasis was shifted this year to place highest priority on data that support indicators of fish abundance for the focal species covered in the Status of the Resource (SOTR) report, as requested by the Columbia Basin Fish and Wildlife Authority (CBFWA) Data Management Framework Subcommittee. We instituted an XML based web service allowing direct access to data from the project database for CBFWA to update the SOTR report. The project also increased efforts to work with tribal fisheries managers to provide data related assistance and to include tribal data in the StreamNet database. A primary theme this year was exploring means to speed the flow of data. We had ongoing success in our strategic emphasis on increasing automation of data conversion through development of comprehensive database systems within our partner agencies, as outlined in our Vision and Strategic Plan. By assisting development of internal database systems, we will be able to automate conversion of agency data to the regionally consistent format as well as help the agency better meet their own data needs. The Idaho StreamNet project contributed to development of IDFG's Idaho Fish and Wildlife Information System (IFWIS), and this year they successfully tested automatic conversion of data to the regional exchange format. We worked with WDFW and developed draft field data input templates for collection of smolt trap and spawning ground survey data. And, we began collaborating in a project with ODFW and EcoTrust to develop an online data dissemination tool. As these and additional data systems are brought online, we expect to be able to shorten the time needed to annually update data, and hope to use the increased efficiency to free existing staff time to develop additional types of data from our partners. Another long-term theme related to expanding data coverage to estimates of productivity and/or data needed to calculate productivity. Initial investigations within our partner agencies indicated that these data are scattered, with some components like age composition of returning fish already being addressed by StreamNet, but others not yet covered. We will continue to determine how available these data are and investigate the feasibility of capturing the estimates and supporting data in the future. Routine ongoing data development of the standard data sets in StreamNet continued this year. An update and new web page for disseminating Protected Areas data was completed. Initial work was done with the CRITFC to get ready to house and disseminate data developed by the Hatchery Scientific Review Group. All database, GIS and web server systems were maintained successfully, with repairs completed as needed. Software applications were developed or maintained, as needed. All required reports, budgets and equipment inventories were submitted. The StreamNet website (www.streamnet.org), the project's primary means of disseminating fish data, was completely redesigned this year to improve

Schmidt, Bruce; Roger, Phil; Oftedahl, Lenora

2008-12-12T23:59:59.000Z

285

Use of partner agents in training systems for complex tasks  

E-Print Network [OSTI]

Complex tasks are an important part of the world today, but training people to perform complex tasks is difficult. These kinds of tasks usually have variable cognitive loads on the trainee, and, once trained, different people have different...

Sims, Joseph Michael

2002-01-01T23:59:59.000Z

286

Aging and the vulnerability of speech to dual task demands  

E-Print Network [OSTI]

Tracking a digital pursuit rotor task was used to measure dual task costs of language production by young and older adults. Tracking performance by both groups was affected by dual task demands: time on target declined and ...

Kemper, Susan; Schmalzried, RaLynn Cheri; Hoffman, Lesa; Herman, Ruth

2010-12-01T23:59:59.000Z

287

Climate Change Task Force Webinar Series | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Climate Change Task Force Webinar Series Climate Change Task Force Webinar Series The four-part Climate Change Impacts and Indian Country webinar series provided tribal leaders an...

288

FAQS Job Task Analyses - Safeguards and Security General Technical...  

Broader source: Energy.gov (indexed) [DOE]

Security General Technical Base FAQS Job Task Analyses - Safeguards and Security General Technical Base FAQS Job Task Analyses are performed on the Function Area Qualification...

289

Federal Task Force Sends Recommendations to President on Fostering...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology August 12,...

290

Indirect Cost (IDC) Return Distribution Indirect costs are required to offset the overhead expenses incurred by the institution in order to  

E-Print Network [OSTI]

by Fiscal Years, then by Fiscal Periods (July=01, Aug=02, etc.). Copy fiscal year from the memo to cell A6 (you will only use cell A21 if completing return for multiple fiscal years). Then copy the fiscal periods from the memo to cell E5. b) Investigator: List all principle investigators that will be receiving

291

RAC Report No. 4-CDC-Task Order 1-1999-Final FINAL REPORT  

E-Print Network [OSTI]

Scientific, Idaho Falls, Idaho Principal Investigator John E Till, Ph.D., Radiological Assessments. McGavran, Ph.D., Environmental Risk Assessment, Inc., Boise, Idaho Marilyn J. Case, Eagle Rock exposures to the public from toxic chemicals released in the past from the Idaho National Engineering

292

DOE Awards Small Business Task Order for Technical Support to the Office of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FY 2012Control Work in

293

Practical Guide to Savings and Payments in FEMP ESPC Task Orders  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15, 2010Energy6DepartmentOutages Update:FleetEnergy -

294

DOE Awards Small Business Task Order for Technical Support to the Office of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmartDepartment of EnergyRenewable Energy,

295

DOE Awards Task Order Modification for Support Services to Office of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmartDepartment of EnergyRenewable

296

DOE Awards Small Business Task Order for Technical Support to the Office of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping aCleanDepartment ofEnvironmental

297

DOE Awards Task Order for Disposal of Los Alamos National Lab Waste |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping aCleanDepartmentTrinity

298

DOE Awards Task Order for Disposal of Los Alamos National Lab Waste |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping aCleanDepartmentTrinityDepartment

299

DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping aCleanDepartmentTrinityDepartment|

300

DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping aCleanDepartmentTrinityDepartment||

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Awards Task Order for Lexington Project Office Audit | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTS AVAILABLEReportEnergyDeveloping

302

DOE ESPC TASK ORDER REQUEST FOR PROPOSAL (TO-RFP) TEMPLATE | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana. DOCUMENTSof Energy DOE Challenge HomeEnergy

303

LMS/RBL/S11219 Task Order LM00-502  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '*I_ - I _ _ _ Amchitka

304

Practical Guide to Savings and Payments in FEMP ESPC Task Orders |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for medical point ofPowerSaver Loan

305

Assessment and evaluation of ceramic filter cleaning techniques: Task Order 19  

SciTech Connect (OSTI)

The objective of this study was to assess and evaluate the effectiveness, appropriateness and economics of ceramic barrier filter cleaning techniques used for high-temperature and high-pressure particulate filtration. Three potential filter cleaning techniques were evaluated. These techniques include, conventional on-line pulse driven reverse gas filter cleaning, off-line reverse gas filter cleaning and a novel rapid pulse driven filter cleaning. These three ceramic filter cleaning techniques are either presently employed, or being considered for use, in the filtration of coal derived gas streams (combustion or gasification) under high-temperature high-pressure conditions. This study was divided into six subtasks: first principle analysis of ceramic barrier filter cleaning mechanisms; operational values for parameters identified with the filter cleaning mechanisms; evaluation and identification of potential ceramic filter cleaning techniques; development of conceptual designs for ceramic barrier filter systems and ceramic barrier filter cleaning systems for two DOE specified power plants; evaluation of ceramic barrier filter system cleaning techniques; and final report and presentation. Within individual sections of this report critical design and operational issues were evaluated and key findings were identified.

Chen, H.; Zaharchuk, R.; Harbaugh, L.B.; Klett, M.

1994-10-01T23:59:59.000Z

306

Sample Task Ordering Agreement for RFP RHB-4-42432-Testing and...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

UNDER PRIME CONTRACT NO. DE-AC36-08GO28308 CONTRACTING PARTY: ALLIANCE FOR SUSTAINABLE ENERGY, LLC MANAGEMENT AND OPERATING CONTRACTOR FOR THE NATIONAL RENEWABLE...

307

RAC Report No. 2-CDC-Task Order 3-2000-FINAL FINAL REPORT  

E-Print Network [OSTI]

Early Hanford Operations Centers for Disease Control and Prevention Department of Health and Human-Lived Gaseous Radionuclides and Radioactive Particles Released to the Atmosphere during Early Hanford Operations that were released to the atmosphere during the early years of operations at the Hanford Reservation near

308

RAC Report No. 3-CDC-Task Order 7-2000-FINAL FINAL REPORT  

E-Print Network [OSTI]

Weapons Site in Hanford, Washington Department of Health and Human Services Centers for Disease Control.S. Department of Energy Nuclear Weapons Site in Hanford, Washington Department of Health and Human Services to download supporting files. #12;EXECUTIVE SUMMARY The Hanford Environmental Dose Reconstruction (HEDR

309

ESPC TASK ORDER REQUEST FOR PROPOSAL (TO RFP) TEMPLATE | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ Contract Document displays

310

AG-Chapter38TaskOrders.pdf | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials2014 Chief

311

ESPC Task Order Financial Schedules (IDIQ Attachment J-6) | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement

312

Task Order Awarded for Audit and Review Services | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClient updateTRI-STATE GENERATIONDepartment of4.0 Pagefor

313

Task Order Awarded to Small Business for Natural Gas Services | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClient updateTRI-STATE GENERATIONDepartment of4.0of

314

Task Order Awarded for Audit and Review Services | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned Small BusinessEMPLOYMENT VERIFICATION1 - In13 - InBlue RibbonAudit and

315

Small Business TerranearPMC Awarded $2 Million Task Order | Department of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the Americas |DOE FormerEnergySaveP R IDepartmentEnergy Small

316

TaskOrderContractingMemotoProcDir.pdf | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration at YoungSuspect|THE WHITEDepartmentHouseholds

317

Attachment J-16 Portfolio Management Task Order 13-003 Revision 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program Cumulus Humilis Aerosol STATEMENT OFCHPRCJ-16

318

CONTRACTNO.: DE-X13-96GJ87335 TASK ORDER NO.: h  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO:March_BayoRECORD OF^_. . _

319

Ordered involutive operator spaces  

E-Print Network [OSTI]

This is a companion to recent papers of the authors; here we construct the `noncommutative Shilov boundary' of a (possibly nonunital) selfadjoint ordered space of Hilbert space operators. The morphisms in the universal property of the boundary preserve order. As an application, we consider `maximal' and `minimal' unitizations of such ordered operator spaces.

Blecher, David P; Neal, Matthew; Werner, Wend

2007-01-01T23:59:59.000Z

320

IMPRESS CONNECT DOCUMENT ORDERING  

E-Print Network [OSTI]

IMPRESS CONNECT DOCUMENT ORDERING USER GUIDE FOR UNF August 2010 #12;OFFICEMAX IMPRESS CONNECT USERMax (case sensitive) Click on "Create New Custom Print Order" under Print & Document Services #12;The first landing page. You will see 3 options across the top of the landing page: Order Jobs, Track Jobs, Manage

Asaithambi, Asai

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

ORNL Transportation Technology Program - Annual Report Fiscal Year 2008  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLC Order No. EA-178-A1ORAU South CampusOREGONdocument

322

Laboratory directed research and development annual report: Fiscal year 1992  

SciTech Connect (OSTI)

The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this order. Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches to research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as: integrated environmental research; process science and engineering; energy distribution and utilization. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these corecompetencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.

Not Available

1993-01-01T23:59:59.000Z

323

Laboratory directed research and development annual report: Fiscal year 1992  

SciTech Connect (OSTI)

The Department of Energy Order DOE 5000.4A establishes DOE's policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this order. Consistent with the Mission Statement and Strategic Plan provided in PNL's Institutional Plan, the LDRD investments are focused on developing new and innovative approaches to research related to our core competencies.'' Currently, PNL's core competencies have been identified as: integrated environmental research; process science and engineering; energy distribution and utilization. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these corecompetencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. The projects described in this report represent PNL's investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL's LDRD program and the management process used for the program and project summaries for each LDRD project.

Not Available

1993-01-01T23:59:59.000Z

324

Many Task Computing for Modeling the Fate of Oil Discharged from the Deep Water Horizon Well  

E-Print Network [OSTI]

Florida and a 3D oil spill model. The ocean models used here resolve the Gulf at 2 km and the SouthMany Task Computing for Modeling the Fate of Oil Discharged from the Deep Water Horizon Well tons of crude oil into the Gulf of Mexico. In order to understand the fate and impact of the discharged

325

FAQS Job Task Analyses- DOE Aviation Safety Officer  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

326

FAQS Job Task Analyses- Electrical Systems and Safety Oversight  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

327

FAQS Job Task Analyses- Nuclear Explosive Safety Study  

Broader source: Energy.gov [DOE]

FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

328

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998, and seven in fiscal year 1999. All of the fiscal year 1996 award projects have been completed and will publish final reports, so their annual updates will not be included in this document. This section summarizes how each of the currently funded grants addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation; Decontamination and Decommissioning; Spent Nuclear Fuel and Nuclear Materials; and Soil and Groundwater Cleanup.

CD Carlson; SQ Bennett

2000-07-25T23:59:59.000Z

329

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards - Fiscal Year 2000 Mid-Year Progress Report  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, eight in fiscal year 1998 and seven in fiscal year 1999.(a) All of the fiscal year 1996 awards have been completed and the Principal Investigators are writing final reports, so their summaries will not be included in this document. This section summarizes how each of the currently funded grants addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research performed at PNNL is focused primarily in four areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, and Soil and Groundwater Cleanup.

Carlson, Clark D.; Bennett, Sheila Q.

2000-07-25T23:59:59.000Z

330

Hierarchical Task Analysis of Intrusion Detection Systems  

E-Print Network [OSTI]

.......................... 4 3. Hierarchical Task Analysis ............................ 6 3.1 Network Security Administrator .................... 7 3.2 Functions of Network Security Administrator ....... 7 4. Diagrams on a single or group of persons called Network Security Administrators. They use a wide variety of tools

Blustein, J.

331

Academic Integrity Task Force Report Executive Summary  

E-Print Network [OSTI]

. For a more comprehensive report of the findings as well as faculty suggestions for maintaining integrity1 Academic Integrity Task Force Report Executive Summary 11/22/11 INTRODUCTION CHARGE: To determine whether there is an issue with academic integrity at UF and, if so, to determine how widespread

Roy, Subrata

332

REPORT OF THE DARK ENERGY TASK FORCE  

E-Print Network [OSTI]

REPORT OF THE DARK ENERGY TASK FORCE Andreas Albrecht, University of California, Davis Gary. Suntzeff, Texas A&M University Dark energy appears to be the dominant component of the physical Universe a full understanding of the cosmic acceleration. For these reasons, the nature of dark energy ranks among

Hu, Wayne

333

Task Management Computer Science and Engineering, UCSD  

E-Print Network [OSTI]

solar cells and stored in a supercapacitor. With sunlight, SHiMmer can operate for long periods of time buffer ­ supercapacitor predictor ­ prediction of future energy harvesting rate controller the supercapacitor lacks sufficient energy to execute a given set of tasks, it is possible to put the device to sleep

Simunic, Tajana

334

Columbia University Network Integration Task Force  

E-Print Network [OSTI]

Columbia University Network Integration Task Force Final Report II 30 January 1992 #12;1 TOWARDS A COMMON ADMINISTRATIVE AND ACADEMIC NETWORK AT COLUMBIA UNIVERSITY Columbia University's Administrative or terminal. 1.2. Executive Summary This report examines Columbia University's current academic

Yang, Junfeng

335

Laboratory Directed Research and Development annual report, Fiscal year 1993  

SciTech Connect (OSTI)

The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 5000.4A, LDRD is ``research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. LDRD includes activities previously defined as ER&D, as well as other discretionary research and development activities not provided for in a DOE program.`` Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our ``core competencies.`` Currently, PNL`s core competencies have been identified as integrated environmental research; process technology; energy systems research. In this report, the individual summaries of Laboratory-level LDRD projects are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. The projects are described in Section 2.0. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. In accordance with DOE guidelines, the report provides an overview of PNL`s LDRD program and the management process used for the program and project summaries for each LDRD project.

Not Available

1994-01-01T23:59:59.000Z

336

The Office of Environmental Management Technical Reports: A Bibliography. Fiscal Year 1999  

SciTech Connect (OSTI)

The Department of Energy's Office of Environmental Management's (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management. This bibliography contains citations for reports published in Fiscal Year 1999 (October 1, 1998 - September 30, 1999). EM's Office of Science and Technology (OST) sponsors this bibliography that covers EM's activities in environmental restoration, waste management, technology development, and facility transition and management. Subjects include subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations.

none

2000-08-01T23:59:59.000Z

337

Princeton Plasma Physics Laboratory - 1995 Highlights. Fiscal Year 1995, 1 October 1994--30 September 1995  

SciTech Connect (OSTI)

The purpose of this Highlights Report is to present a brief overview of the Laboratory`s significant research accomplishments during the fiscal year 1995. The activities covered in this report include advances on the large projects, such as the discovery of the Enhanced Reversed Shear mode on the TFTR and the engineering design developments in the International Thermonuclear Experimental Reactor project, as well as the significant progress made in plasma theory, small-scale experiments, technology transfer, graduate education, and the Laboratory`s outreach program in science education.

NONE

1996-12-01T23:59:59.000Z

338

Buried waste integrated demonstration fiscal year 1992 close-out report  

SciTech Connect (OSTI)

The mission of the Buried Waste Integrated Demonstration Program (BWID) is to support the development and demonstration of a suite of technologies that when integrated with commercially-available baseline technologies form a comprehensive remediation system for the effective and efficient remediation of buried waste disposed of throughout the US Department of Energy complex. To accomplish this mission of identifying technological solutions for remediation deficiencies, the Office of Technology Development initiated the BWID at the Idaho National Engineering Laboratory in fiscal year (FY)-91. This report summarizes the activities of the BWID Program during FY-92.

Cannon, P.G.; Kostelnik, K.M.; Owens, K.J.

1993-02-01T23:59:59.000Z

339

Annual review of cultural resource investigations by the Savannah River Archaeological Research Program. Fiscal year 1994  

SciTech Connect (OSTI)

The Savannah River Archaeological Research Program (SRARP) of the South Carolina Institute of Archaeology and Anthropology, University of South Carolina, manages archaeological resources on the Savannah River Site (SRS). An ongoing research program provides the theoretical, methodological, and empirical basis for assessing site significance within the compliance process specified by law. The SRARP maintains an active public education program for disseminating knowledge about prehistory and history, and for enhancing awareness of historic preservation. This report summarizes the management, research, and public education activities of the SRARP during Fiscal Year 1994.

NONE

1994-10-01T23:59:59.000Z

340

Fiscal Year 2014 GreenBuy Award Winners Announced | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResourcesFLASH2011-11-OPAMFY 2007 TotalFinalJobs Findof Energyof79012Fiscal

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Fiscal Year 2013 Phase II (Release 2) Awardee List | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review:Department ofDistributionFire Protection ProgramDepartment ofFiscal Year

342

Fiscal Year's (FY) 2011 and 2012 Balanced Scorecard Guidance for Federal  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport Maine WindFLASH2011-6-OPAMFY2012Final FY 2009First U.S.Fiscal Year 2013Sites

343

The Solar Thermal Design Assistance Center report of its activities and accomplishments in Fiscal Year 1993  

SciTech Connect (OSTI)

The Solar Thermal Design Assistance Center (STDAC) at Sandia National Laboratories is a resource provided by the US Department of Energy`s Solar Thermal Program. Its major objectives are to accelerate the use of solar thermal systems through (a) direct technical assistance to users, (b) cooperative test, evaluation, and development efforts with private industry, and (c) educational outreach activities. This report outlines the major activities and accomplishments of the STDAC in Fiscal Year 1993. The report also contains a comprehensive list of persons who contacted the STDAC by telephone for information or technical consulting.

Menicucci, D.F.

1994-03-01T23:59:59.000Z

344

Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1  

SciTech Connect (OSTI)

This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

345

Directives System Order  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order prescribes the process for development of Policy Statements, Orders, Notices, Manuals and Guides, which are intended to guide, inform, and instruct employees in the performance of their jobs, and enable them to work effectively within the Department and with agencies, contractors, and the public.

1995-10-16T23:59:59.000Z

346

Laboratory directed research and development annual report. Fiscal year 1994  

SciTech Connect (OSTI)

The Department of Energy Order DOE 5000.4A establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. This report represents Pacific Northwest Laboratory`s (PNL`s) LDRD report for FY 1994. During FY 1994, 161 LDRD projects were selected for support through PNL`s LDRD project selection process. Total funding allocated to these projects was $13.7 million. Consistent with the Mission Statement and Strategic Plan provided in PNL`s Institutional Plan, the LDRD investments are focused on developing new and innovative approaches in research related to our {open_quotes}core competencies.{close_quotes} Currently, PNL`s core competencies have been identified as integrated environmental research; process science and engineering; energy systems development. In this report, the individual summaries of LDRD projects (presented in Section 1.0) are organized according to these core competencies. The largest proportion of Laboratory-level LDRD funds is allocated to the core competency of integrated environmental research. Projects within the three core competency areas were approximately 91.4 % of total LDRD project funding at PNL in FY 1994. A significant proportion of PNL`s LDRD funds are also allocated to projects within the various research centers that are proposed by individual researchers or small research teams. Funding allocated to each of these projects is typically $35K or less. The projects described in this report represent PNL`s investment in its future and are vital to maintaining the ability to develop creative solutions for the scientific and technical challenges faced by DOE and the nation. The report provides an overview of PNL`s LDRD program, the management process used for the program, and project summaries for each LDRD project.

NONE

1995-02-01T23:59:59.000Z

347

The effects of televised angular displacement of visual feedback on a remote manipulation task  

E-Print Network [OSTI]

27 Figure 15 Sub lect performing day one learning task. . . . . . 29 Figure 16 Experimenter collecting time and contacts data. 34 Figure 17 Effect of Viewing Condition on Mean Number of Contacts/Trial/Sub iect. 36 Figur e 18 Effect of Trial... in the following order: direct, 0/90, 0/45, and mono. Subjects were given a five minute break every two trials (see Appendix B for instructions). tl ' ~kt. o th 4 4 y. th r t t t di task was done exclusively. Subjects used the joystick controls to manipulate...

Smith, Randy Lin

1986-01-01T23:59:59.000Z

348

The effect of "white noise" on time perception, task satisfaction, and performance  

E-Print Network [OSTI]

), which is frequently used to measure job satisfaction (Locke, 1976), was administered to each subject in order to obtain a measure of task satisfaction. The JDI is presented in the Appendix. Procedure The ten subjects within each group were tested.... 5 21. 7 17. 0 15. 2 Table 4 Mean JDI Measures of Task Satisfaction Per Group Group JDI Mean Score High Noise Low Noise No Noise 15. 6 19. 1 22, 8 DISCUSSION AND CONCLUSION The first objective of the present study was to show that a...

Stuart, Mark Alan

1979-01-01T23:59:59.000Z

349

Agencies Approve Bacteria TMDL Task Force Recommendations  

E-Print Network [OSTI]

their agencies to update their TMDL guidance documents to reflect these recommendations. They also authorized establishing a multi-agency bacteria TMDL work group to examine the research and development needs identified in the task force report. Both TCEQ... activities needed to strengthen the scientific tools available for TMDL and I-Plan development. The report and related documents are available at twri.tamu.edu/bacteriatmdl/. Tier 1 Analysis (T1) (one-year) Required for all bacteria TMDLs. ? Form TMDL...

Wythe, Kathy

2007-01-01T23:59:59.000Z

350

Electric and Hybrid Vehicles Program 18th annual report to Congress for Fiscal Year 1994  

SciTech Connect (OSTI)

The Department remains focused on the technologies that are critical to making electric and hybrid vehicles commercially viable and competitive with current production gasoline-fueled vehicles in performance, reliability, and affordability. During Fiscal Year 1994, significant progress was made toward fulfilling the intent of Congress. The Department and the United States Advanced Battery Consortium (a partnership of the three major domestic automobile manufacturers) continued to work together and to focus the efforts of battery developers on the battery technologies that are most likely to be commercialized in the near term. Progress was made in industry cost-shared contracts toward demonstrating the technical feasibility of fuel cells for passenger bus and light duty vehicle applications. Two industry teams which will develop hybrid vehicle propulsion technologies have been selected through competitive procurement and have initiated work, in Fiscal Year 1994. In addition, technical studies and program planning continue, as required by the Energy Policy Act of 1992, to achieve the goals of reducing the transportation sector dependence on imported oil, reducing the level of environmentally harmful emissions, and enhancing industrial productivity and competitiveness.

NONE

1995-04-01T23:59:59.000Z

351

Superconductors with Topological Order  

E-Print Network [OSTI]

We propose a mechanism of superconductivity in which the order of the ground state does not arise from the usual Landau mechanism of spontaneous symmetry breaking but is rather of topological origin. The low-energy effective theory is formulated in terms of emerging gauge fields rather than a local order parameter and the ground state is degenerate on topologically non-trivial manifolds. The simplest example of this mechanism of superconductivty is concretely realized as global superconductivty in Josephson junction arrays.

M. C. Diamantini; P. Sodano; C. A. Trugenberger

2005-11-18T23:59:59.000Z

352

National Center for Atmospheric Research annual report, fiscal year 1991. Report for 1 October 1990-30 September 1991  

SciTech Connect (OSTI)

The National Center for Atmospheric Research (NCAR) annual report for fiscal year 1991 is presented. NCAR's projects for the period included investigations of air pollution from the oil well fires in Kuwait, a solar eclipse, thunderstorms in central Florida, the El Nino current, greenhouse processes, and upper atmosphere phenomena.

Warner, L.

1992-06-01T23:59:59.000Z

353

Leadership Development Scholarship Fiscal Year 2015 Please copy for your files and submit the application, along with a full description  

E-Print Network [OSTI]

Team has allocated funds in the FY 2015 budget to support Leadership Development Scholarships or received a scholarship funded through the Leadership Development Scholarship program during FY 2015 (7Leadership Development Scholarship Fiscal Year 2015 Please copy for your files and submit

Squire, Larry R.

354

FISCAL YEAR 2015 B U D G E T E S T I M A T E S  

E-Print Network [OSTI]

to improve the quality of life on our home planet 2 #12;2015 Budget Highlights Provides the necessary planet and the Sun. By the end of FY 2015, NASA will have launched an unprecedented five Earth scienceFISCAL YEAR 2015 B U D G E T E S T I M A T E S 1 #12;Strategic Plan Expand the frontiers

Waliser, Duane E.

355

FISCAL FORESIGHT: ANALYTICS AND ECONOMETRICS ERIC M. LEEPER, TODD B. WALKER, AND SHU-CHUN SUSAN YANG  

E-Print Network [OSTI]

FISCAL FORESIGHT: ANALYTICS AND ECONOMETRICS ERIC M. LEEPER, TODD B. WALKER, AND SHU-CHUN SUSAN policy process. This paper develops an analytical framework to study the econometric implications from statistical innovations in conventional ways. Econometric analyses that fail to align agents

Hickman, Mark

356

June 11, 2009, HSS/Union Task Meeting on 2009 HSS/Union Task Progress - Task Leads Schedule  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7January 2015JimJulieand High21EFCOG05-09 TASK

357

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

Peurrung, L.M.

1999-06-30T23:59:59.000Z

358

aapm task group: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High North 2000-01-01 4 Submission to the Prime Minister's Task Group on Emissions Trading in response to the Task Group's Issues Paper of February 2007 Environmental...

359

REPORT OF THE TASK FORCE ON NUCLEAR NONPROLIFERATION  

Broader source: Energy.gov [DOE]

The Secretary of Energy on December 20, 2013 established the Secretary of Energy Advisory Board (SEAB) Task Force on Nuclear Nonproliferation and charged the Task Force to advise the DOE on future areas of emphasis for its nuclear nonproliferation activities

360

NREL Job Task Analysis: Retrofit Installer Technician (Revised)  

SciTech Connect (OSTI)

A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence.

Kurnik, C.; Woodley, C.

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

On ordered $?$-semigroups ($?$-semigroups)  

E-Print Network [OSTI]

We add here some further characterizations to the characterizations of strongly regular ordered $\\Gamma$-semigroups already considered in Hacettepe J. Math. 42 (2013), 559--567. Our results generalize the characterizations of strongly regular ordered semigroups given in the Theorem in Math. Japon. 48 (1998), 213--215, in case of ordered $\\Gamma$-semigroups. The aim of writing this paper is not just to add a publication in $\\Gamma$-semigroups but, mainly, as a continuation of the paper "On regular duo $po$-$\\Gamma$-semigroups in Math. Slovaca 61 (2011), 871--884, to publish a paper which serves as an example to show what a $\\Gamma$-semigroup is and give the right information about this structure.

Niovi Kehayopulu

2014-03-05T23:59:59.000Z

362

Nested Topological Order  

E-Print Network [OSTI]

We introduce the concept of nested topological order in a class of exact quantum lattice Hamiltonian models with non-abelian discrete gauge symmetry. The topological order present in the models can be partially destroyed by introducing a gauge symmetry reduction mechanism. When symmetry is reduced in several islands only, this imposes boundary conditions to the rest of the system giving rise to topological ground state degeneracy. This degeneracy is related to the existence of topological fluxes in between islands or, alternatively, hidden charges at islands. Additionally, island deformations give rise to an extension of topological quantum computation beyond quasiparticles.

H. Bombin; M. A. Martin-Delgado

2008-03-30T23:59:59.000Z

363

ERROR VISUALIZATION FOR TANDEM ACOUSTIC MODELING ON THE AURORA TASK  

E-Print Network [OSTI]

ERROR VISUALIZATION FOR TANDEM ACOUSTIC MODELING ON THE AURORA TASK Manuel J. Reyes. This structure reduces the error rate on the Aurora 2 noisy English digits task by more than 50% compared development of tandem systems showed an improvement in the performance on the Aurora task [2] of these systems

Ellis, Dan

364

IEA Bioenergy task 40 Country report for the Netherlands  

E-Print Network [OSTI]

1 IEA Bioenergy task 40 ­ Country report for the Netherlands Update 2006 Martin Junginger Marc de-energy trade #12;IEA Bioenergy task 40 Country report for the Netherlands ­update 2006 i IEA Bioenergy Task 40 ­ Country report for the Netherlands Update 2006 Martin Junginger Marc de Wit André Faaij This study

365

Weardale Task Force | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpenWende NewSowitec do BrasilGmbHWeardale Task Force Jump to:

366

TASK PLAN: Tribal Issues Topic Group  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNGInternational EnergyCommitteeRenewable Energy, U.S.ArbitraryTask Plan 1 Tribal

367

Dynamic Scheduling of Soft Aperiodic Tasks and Periodic Tasks with Skips Audrey Marchand and Maryline Silly-Chetto  

E-Print Network [OSTI]

Dynamic Scheduling of Soft Aperiodic Tasks and Periodic Tasks with Skips Audrey Marchand Nantes cedex 03 France Email: {audrey.marchand, maryline.chetto}@iut-nantes.univ-nantes.fr Abstract Soft

Marchand, Audrey

368

Considerations of noise and performance on a secondary task for the use of compressed speech in a cockpit environment  

E-Print Network [OSTI]

Noise Comp x Subj(Noise x Order) 0. 0056 3 0. 0019 0. 17 Comp x Subj(Noise x Order) 0. 0093 3 0. 0031 0. 29 * significant at p 0. 0001 TABLE 8 ANOVA for Secondary Task Performance (Tracking Performance during Message) SOURCE Between Subjects... by performance on a secondary tracking task. Research participants listened to verbal messages and were required to write them down shortly afterwards. For each research part1ci pant this was done with each of four com- pression levels: 0, 17, 50, and 100...

Crittenden, Lorri June

1986-01-01T23:59:59.000Z

369

Chemometrics review for chemical sensor development, task 7 report  

SciTech Connect (OSTI)

This report, the seventh in a series on the evaluation of several chemical sensors for use in the U.S. Department of Energy`s (DOE`s) site characterization and monitoring programs, concentrates on the potential use of chemometrics techniques in analysis of sensor data. Chemometrics is the chemical discipline that uses mathematical, statistical, and other methods that employ formal logic to: design or select optimal measurement procedures and experiments and provide maximum relevant chemical information by analyzing chemical data. The report emphasizes the latter aspect. In a formal sense, two distinct phases are in chemometrics applications to analytical chemistry problems: (1) the exploratory data analysis phase and (2) the calibration and prediction phase. For use in real-world problems, it is wise to add a third aspect - the independent validation and verification phase. In practical applications, such as the ERWM work, and in order of decreasing difficulties, the most difficult tasks in chemometrics are: establishing the necessary infrastructure (to manage sampling records, data handling, and data storage and related aspects), exploring data analysis, and solving calibration problems, especially for nonlinear models. Chemometrics techniques are different for what are called zeroth-, first-, and second-order systems, and the details depend on the form of the assumed functional relationship between the measured response and the concentrations of components in mixtures. In general, linear relationships can be handled relatively easily, but nonlinear relationships can be difficult.

NONE

1994-05-01T23:59:59.000Z

370

Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders  

SciTech Connect (OSTI)

The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project.

NONE

1997-12-31T23:59:59.000Z

371

Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project  

SciTech Connect (OSTI)

This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project.

NONE

1996-10-01T23:59:59.000Z

372

Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary  

SciTech Connect (OSTI)

The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001 Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.

REEP, I.E.

1999-05-12T23:59:59.000Z

373

Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996  

SciTech Connect (OSTI)

During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

NONE

1996-12-31T23:59:59.000Z

374

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect (OSTI)

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

375

Office of Civilian Radioactive Waste Management fiscal year 1996 annual report to Congress  

SciTech Connect (OSTI)

In Fiscal Year 1996 a revised program strategy was developed that reflects Administration policy and responds to sharply reduced funding and congressional guidance while maintaining progress toward long-term objectives. The program is on track, working toward an early, comprehensive assessment of the viability of the Yucca Mountain site; more closely determining what will be required to incorporate defense waste into the waste management system; pursuing a market-driven strategy for waste acceptance, storage, and transportation; and preserving the core capability to respond to an interim storage contingency. Overall, the elements of an integrated system for managing the Nation`s spent fuel and high-level radioactive waste are emerging, more soundly conceived, and more modestly designed, as the OCRWM works toward the physical reality of waste shipments to Federal facilities.

NONE

1997-05-01T23:59:59.000Z

376

Summary of in situ vitrification modeling and analysis accomplishments for fiscal year 1991  

SciTech Connect (OSTI)

The in situ vitrification (ISV) modeling activities encompass a variety of both modeling development efforts and analysis applications in support of the ISV project. The model development effort is directed toward modifying or developing a set of computer codes to simulate the ISV process. These codes are used to perform safety and environmental hazards analyses, assist in experimental test planning and design, assist in equipment design and development of operating procedures, and provide enhanced understanding of the ISV process. This report presents a summary description of the accomplishments in Fiscal Year 1991 for both the model development and analysis areas. Brief descriptions of the models that were developed and the more important conclusions from the analytical studies are presented.

Slater, C.E.

1991-11-01T23:59:59.000Z

377

U.S. Department of Energy fiscal year 1997 annual report  

SciTech Connect (OSTI)

The Government Management Reform Act and the Government Performance and Results Act both have the objective of ensuring that Federal government agencies are accountable to American taxpayers. This report provides a clear accounting of the return on the investment entrusted to the Department of Energy. Unlike previous annual reports prepared by the Department, this report is fashioned along the lines of a corporate report to the shareholders. Not only does this report contain audited financial statements for the fiscal year but it also describes what the shareholders, American taxpayers, received in the way of services and contributions to the important National goals this Administration and the Department have promised to provide. This report provides a progress report on how the Department is serving the country and how they are doing it for much lower cost.

NONE

1998-02-01T23:59:59.000Z

378

Environmental Sciences Division Groundwater Program Office report for fiscal years 1995--1997  

SciTech Connect (OSTI)

The purpose of this report is to summarize the activities of the Groundwater Program Office in fiscal years 1995--1997 and document technical results achieved. One of the first contributions of the project was development and publication of a conceptual hydrologic framework for the Oak Ridge Reservation. This framework then served to guide research to fill important gaps in knowledge and suggest the most cost-effective approaches to site characterization and remediation. Examples of major goals include: quantitative characterization of the role of matrix diffusion in slowing transport of contaminants and impacting the practicality of pump and treat options for aquifer restoration; the importance of geologic structure and preferred flow pathways in the near surface zone (including the role of stormflow); evaluation of the importance of the deep groundwater system in contaminant migration; and acquisition of three-dimensional groundwater flow and contaminant transport simulation capability for fractured porous media.

Huff, D.D. [comp.

1998-03-01T23:59:59.000Z

379

TASK 40: Sustainable International Bio Energy Trade: securing supply Overview of the task  

E-Print Network [OSTI]

Page 1 TASK 40: Sustainable International Bio Energy Trade: securing supply and demand Overview-term security. Participating countries (status end 2005): · Belgium, Brazil, Canada, Finland, Netherlands, Utrecht University, the Netherlands Martijn Wagener (until October 2005), Alf van Weereld, Peter

380

Energy and task management in energy harvesting wireless sensor networks for structural health monitoring  

E-Print Network [OSTI]

Chapter 4. System Energy and Task Management . . 1. System2. Energy and Task Management Algorithms A. Energy3. Energy and Task Management Algorithms A. Energy

Steck, Jamie Bradley

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Task force reduces stuck-pipe costs  

SciTech Connect (OSTI)

A task-force approach to stuck pipe has produced more than a 70% reduction in BP Exploration Operating Co.'s worldwide stuck-pipe costs during 1989 and 1990. We believe that these results have been primarily due to focusing our attention on improving personnel performance rather than to the introduction of new technology. Key elements in this paper of the efforts involved: Recognizing the importance of the drilling contractor and the service company staff's role in helping control stuck pipe; Promoting a rig-team approach to tackling the problem; Providing training on rig-team, stuck-pipe problem solving; and raising awareness of stuck pipe through a coordinated worldwide communications program among BP, contractors, and service companies.

Bradley, W.B. (BP Research, Houston, TX (US)); Jarman, D. (BP Exploration Operation Co., Aberdeen (GB)); Auflick, R.A.; Plott, R.S. (BP Exploration Operating Co., Houston, TX (US)); Wood, R.D. (BP Exploration Operating Co., London (GB)); Schofield, T.R. (BP Exploration Operating Co., Beijing (CN)); Cocking, D. (BP Exploration Operating Co., Ho Chi Minh City (CN))

1991-05-27T23:59:59.000Z

382

Task 8.9 - Advanced ceramic materials  

SciTech Connect (OSTI)

Advanced ceramic materials such as Continuous Fiber Reinforced Ceramic Matrix Composites (CFCCs) have had promising results on the companion program entitled ``Ceramic Stationary Gas Turbine`` (CSGT). In particular, CFCCs have outperformed monolithic tiles in structural integrity as a combustor liner. Also, CFCCs have provided the higher temperature operation and improved emissions performance that is required for the ATS combustor. The demonstrated advantages on CSGT justified work to explore the use of advanced ceramic composite materials in other gas turbine components. Sub-tasks include development of a practical, cost effective component fabrication process, development of finite element stress analysis to assure 30,000 hours of component life, and fabrication of a demonstration article.

NONE

1997-06-30T23:59:59.000Z

383

TRU drum corrosion task team report  

SciTech Connect (OSTI)

During routine inspections in March 1996, transuranic (TRU) waste drums stored at the Radioactive Waste Management Complex (RWMC) were found with pinholes and leaking fluid. These drums were overpacked, and further inspection discovered over 200 drums with similar corrosion. A task team was assigned to investigate the problem with four specific objectives: to identify any other drums in RWMC TRU storage with pinhole corrosion; to evaluate the adequacy of the RWMC inspection process; to determine the precise mechanism(s) generating the pinhole drum corrosion; and to assess the implications of this event for WIPP certifiability of waste drums. The task team investigations analyzed the source of the pinholes to be Hcl-induced localized pitting corrosion. Hcl formation is directly related to the polychlorinated hydrocarbon volatile organic compounds (VOCs) in the waste. Most of the drums showing pinhole corrosion are from Content Code-003 (CC-003) because they contain the highest amounts of polychlorinated VOCs as determined by headspace gas analysis. CC-001 drums represent the only other content code with a significant number of pinhole corrosion drums because their headspace gas VOC content, although significantly less than CC-003, is far greater than that of the other content codes. The exact mechanisms of Hcl formation could not be determined, but radiolytic and reductive dechlorination and direct reduction of halocarbons were analyzed as the likely operable reactions. The team considered the entire range of feasible options, ranked and prioritized the alternatives, and recommended the optimal solution that maximizes protection of worker and public safety while minimizing impacts on RWMC and TRU program operations.

Kooda, K.E.; Lavery, C.A.; Zeek, D.P.

1996-05-01T23:59:59.000Z

384

B U D G E T E S T I M A T E S FISCAL YEAR 2015  

E-Print Network [OSTI]

, and stewardship of Earth Strategic Plan #12;3 2015 Budget Highlights Provides the necessary resources to advance and the dynamics between our planet and the Sun. By the end of FY 2015, NASA will have launched an unprecedented1 B U D G E T E S T I M A T E S FISCAL YEAR 2015 #12;2 Serve the American public and accomplish our

385

Isotope production and distribution Programs Fiscal Year (FY) 1995 Financial Statement Audit (ER-FC-96-01)  

SciTech Connect (OSTI)

The charter of the Department of Energy (DOE) Isotope Production and Distribution Program (Isotope Program) covers the production and sale of radioactive and stable isotopes, associated byproducts, surplus materials such as lithium and deuterium, and related isotope services. Services provided include, but are not limited to, irradiation services, target preparation and processing, source encapsulation and other special preparations, analyses, chemical separations, and leasing of stable isotopes for research purposes. Isotope Program products and services are sold worldwide for use in a wide variety of research, development, biomedical, and industrial applications. The Isotope Program reports to the Director of the Office of Nuclear Energy, Science and Technology. The Isotope Program operates under a revolving fund, as established by the Fiscal Year 1990 Energy and Water Appropriations Act (Public Law 101-101). The Fiscal Year 1995 Appropriations Act (Public Law 103-316) modified predecessor acts to allow prices charged for Isotope Program products and services to be based on production costs, market value, the needs of the research community, and other factors. Prices set for small-volume, high-cost isotopes that are needed for research may not achieve full-cost recovery. Isotope Program costs are financed by revenues from the sale of isotopes and associated services and through payments from the isotope support decision unit, which was established in the DOE fiscal year 1995 Energy, Supply, Research, and Development appropriation. The isotope decision unit finances the production and processing of unprofitable isotopes that are vital to the national interest.

NONE

1996-02-12T23:59:59.000Z

386

RTG_Task Plan 12-18-07  

Broader source: Energy.gov (indexed) [DOE]

Topic Group Task Plan (as of 121807) Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of Logistics Management, Alex Thrower (202)...

387

Secretary Chu Tasks Environmental, Industry and State Leaders...  

Office of Environmental Management (EM)

to Recommend Best Practices for Safe, Responsible Development of America's Onshore Natural Gas Resources Secretary Chu Tasks Environmental, Industry and State Leaders to...

388

Transmission Services WIST Task Force Dynamic Transfer Capability...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Force Dynamic Transfer Capability Report - Phase I BPA is an active participant in the Wind Integration Study Team (WIST), especially the Task Force looking at DTC study...

389

Colorado - Report of the Task Force on Statewide Transmission...  

Open Energy Info (EERE)

Permitting Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Colorado - Report of the Task Force on Statewide Transmission Siting and Permitting Abstract...

390

Scheduling of Two Agents Task Chains with a Central Selection ...  

E-Print Network [OSTI]

each task belongs to one agent, and each agent is only interested in optimizing his/her own performance index. Although these problems can be viewed as a ...

2014-06-13T23:59:59.000Z

391

RIS-M-2519 A FRAMEWORK FOR COGNITIVE TASK ANALYSIS IN SYSTEMS DESIGN  

E-Print Network [OSTI]

of the current task by means of an analysis of the cognitive task. cont. INIS Descriptors. DECISION MAKING

392

Cofinal types of directed orders  

E-Print Network [OSTI]

, ) directed partial orders #12;Cofinal types (P, ), (Q, ) directed partial orders Tukey reducibility: (P orders Tukey reducibility: (P, ) T (Q, ) if f : P Q X P unbounded = f [X] Q unbounded g : Q P Y Q cofinal = g[Y ] P cofinal #12;Cofinal types (P, ), (Q, ) directed partial orders Tukey reducibility: (P

Mátrai, Tamás

393

Gasification Studies Task 4 Topical Report  

SciTech Connect (OSTI)

A key objective of the Task 4 activities has been to develop simulation tools to support development, troubleshooting and optimization of pressurized entrained-flow coal gasifiers. The overall gasifier models (Subtask 4.1) combine submodels for fluid flow (Subtask 4.2) and heat transfer (Subtask 4.3) with fundamental understanding of the chemical processes (Subtask 4.4) processes that take place as coal particles are converted to synthesis gas and slag. However, it is important to be able to compare predictions from the models against data obtained from actual operating coal gasifiers, and Subtask 4.6 aims to provide an accessible, non-proprietary system, which can be operated over a wide range of conditions to provide well-characterized data for model validation. Highlights of this work include: • Verification and validation activities performed with the Arches coal gasification simulation tool on experimental data from the CANMET gasifier (Subtask 4.1). • The simulation of multiphase reacting flows with coal particles including detailed gas-phase chemistry calculations using an extension of the one-dimensional turbulence model’s capability (Subtask 4.2). • The demonstration and implementation of the Reverse Monte Carlo ray tracing (RMCRT) radiation algorithm in the ARCHES code (Subtask 4.3). • Determination of steam and CO{sub 2} gasification kinetics of bituminous coal chars at high temperature and elevated pressure under entrained-flow conditions (Subtask 4.4). In addition, attempts were made to gain insight into the chemical structure differences between young and mature coal soot, but both NMR and TEM characterization efforts were hampered by the highly reacted nature of the soot. • The development, operation, and demonstration of in-situ gas phase measurements from the University of Utah’s pilot-scale entrained-flow coal gasifier (EFG) (Subtask 4.6). This subtask aimed at acquiring predictable, consistent performance and characterizing the environment within the gasifier.

Whitty, Kevin; Fletcher, Thomas; Pugmire, Ronald; Smith, Philip; Sutherland, James; Thornock, Jeremy; Boshayeshi, Babak; Hunsacker, Isaac; Lewis, Aaron; Waind, Travis; Kelly, Kerry

2014-02-01T23:59:59.000Z

394

The Task Agent Resource Function application in UAV domain  

E-Print Network [OSTI]

The Task Agent Resource Function application in UAV domain Tan Viet Anh Truong Ecole National is to present an application of TARF (Task Agent Resource Function) in UAV domain. This TARF is used to optimize of a generic mission planner for cross domain such as UAV, maritime, automotive and manned aerial vehicle (MAV

Paris-Sud XI, Université de

395

Turing Machine as an ecological model for Task Analysis  

E-Print Network [OSTI]

1 Turing Machine as an ecological model for Task Analysis Thierry Morineau, Emmanuel Frénod model is based on the Turing Machine formalism and takes into account the variety of situations that can opening a door. Keywords: Cognitive work analysis, task analysis, Turing machine, affordance #12;3 1

Frénod, Emmanuel

396

Task Scheduling and Voltage Selection for Energy Minimization  

E-Print Network [OSTI]

. However, task schedul- ing without consideration of VS may not present the best energy saving potential to sleep mode while idling are becoming available 1, 11 . Two main system level energy saving techniques a large amount of energy saving 17 . In this paper, we consider real-time dependent tasks with deadlines

Hu, Xiaobo Sharon

397

Task Allocation in Ant Colonies Alejandro Cornejo1  

E-Print Network [OSTI]

and Evolutionary Biology 3 Massachusetts Institute of Technology CSAIL Abstract. In this paper we propose intruders or parasites. The number of individuals allocated to each task varies over time in response to changes in the demand for different tasks. From a biology perspective, there is an extensive body

Lynch, Nancy

398

Task 8 -- Design and test of critical components  

SciTech Connect (OSTI)

This report covers tasks 8.1, 8.1.1, and 8.2. The primary objective of Task 8.1, Particulates Flow Deposition, is to characterize the particulate generated in an operating gas turbine combined cycle (GTCC) power plant whose configuration approximates that proposed for an ATS power plant. In addition, the task is to evaluate the use of full-flow filtering to reduce the steam particulate loads. Before the start of this task, GE had already negotiated an agreement with the candidate power plant, piping and a filter unit had already been installed at the power plant site, and major elements of the data acquisition system had been purchased. The objective of Task 8.1.1, Coolant Purity, is to expose typical ATS gas turbine airfoil cooling channel geometries to real steam flow to determine whether there are any unexpected deposit formations. The task is a static analog of the centrifugal deposition rig trials of Task 8.2, in which a bucket channel return bend is exposed to steam flow. Two cooling channel geometries are of primary interest in this static exposure. The primary objective of Task 8.2, Particle Centrifugal Sedimentation, is to determine the settling characteristics of particles in a cooling stream from an operating gas turbine combined cycle (GTCC) power plant when that stream is ducted through a passage experiencing the G-loads expected in a simulated bucket channel specimen representative of designs proposed for an ATS gas turbine.

Chance, T.F.

1996-11-01T23:59:59.000Z

399

UW SCHOOL OF PHARMACY EDUCATIONAL INNOVATION TASK FORCE  

E-Print Network [OSTI]

UW SCHOOL OF PHARMACY EDUCATIONAL INNOVATION TASK FORCE 2012-2013 Barry Gidal (chair) Ron Burnette of the Task Force and how those activities fulfilled the charges and support the School's mission and strategic priorities. These documents will be posted, as appropriate, on the SOP Committee webpage (http://pharmacy.wisc.edu/about-school

Sheridan, Jennifer

400

Age-Related Changes in Task Related Functional Network Connectivity  

E-Print Network [OSTI]

the information load [2,3,4], retention interval [5,6] and response time duration [7,8]. Results from fMRI studies-serving these processes have been elucidated with experimental manipulations that vary task demands by altering with these alterations in task demands [9]. Advancing age is associated with decreased performance on verbal working

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Academic Science Program Task Force Tuesday, September 13, 2011  

E-Print Network [OSTI]

Academic Science Program Task Force Tuesday, September 13, 2011 3:00 p.m. Nelson Hall, Room 3220 on the Academic Science Program Task Force to Council of Deans on Thursday, September 22, 2011 · Margery has been, September 28, 2011 in Witherspoon Cinema from 3-4 p.m. and topics will include budget, strategic plan

402

COST FUNCTIONS FOR SCHEDULING TASKS IN CYBER-PHYSICAL SYSTEMS  

E-Print Network [OSTI]

COST FUNCTIONS FOR SCHEDULING TASKS IN CYBER-PHYSICAL SYSTEMS Abhinna Jain, C.M. Krishna, Israel, cost functions, controlled plant dynamics Abstract: In Cyber Physical Systems (CPS), computational response times are different. In this paper, we consider using cost functions of task response time

Massachusetts at Amherst, University of

403

MODELING AND CONTROLLING PARALLEL TASKS IN DROPLET-BASED MICROFLUIDIC  

E-Print Network [OSTI]

Chapter 12 MODELING AND CONTROLLING PARALLEL TASKS IN DROPLET-BASED MICROFLUIDIC SYSTEMS Karl F-independent models and algorithms to automate the operation of droplet-based microfluidic systems. In these systems mapping of a biochemical analysis task onto a droplet-based microfluidic system is investigated. Achieving

404

U.S. Nuclear Regulatory Commission accountability report, fiscal year 1995. Volume 1  

SciTech Connect (OSTI)

The US Nuclear Regulatory Commission (NRC) is one of six Federal agencies participating in a pilot project to streamline financial management reporting. The goal of this pilot is to consolidate performance-related reporting into a single accountability report. The project, which is being carried out under the guidance of the Chief Financial Officers Council, was undertaken in accordance with the Government Management Reform Act (GMRA) of 1994. The GMRA permits the streamlining of financial management reports in consultation with the appropriate Congressional Committees through a liaison in the US Office of Management and Budget (OMB). The results of the pilot project will determine the method to be used for reporting financial management information for fiscal year (FY) 1996. This report consolidates the information previously reported in the following documents: (1) the NRC`s annual financial statement required by the Chief Financial Officers Act of 1990; (2) the Chairman`s annual report to the President and the Congress, required by the Federal Managers` Financial Integrity Act of 1982; (3) the Chairman`s semiannual report to the Congress on management decisions and final actions on Office of Inspector General audit recommendations, required by the Inspector General Act of 1978, as amended. This report also includes performance measures, as required by the Chief Financial Officers Act of 1990.

NONE

1996-05-01T23:59:59.000Z

405

Hot dry rock geothermal energy development program: Annual report, Fiscal year 1986  

SciTech Connect (OSTI)

Preparation, execution, and analysis of a 30-day Initial Closed-Loop Flow Test (ICFT) of the Phase II reservoir were the primary objectives of the Hot Dry Rock Program in fiscal year 1986. The ICFT successfully tested the Phase II heat-extraction loop with the injection of 37,000 m/sup 3/ of cold water and production of 23,000 m/sup 3/ of hot water, extracting up to 10 MW/sub t/ when production reached 0.0139 m/sup 3//s at 192/degree/C. By the end of the test, water loss rate has decreased to 26% and a significant portion of the injected water had been recovered, 66% during the test and an additional 20% during subsequent venting. Geochemical, tracer, and seismic analyses suggest reservoir fracture volume was growing throughout the test. A new technique, the ''three-point'' method, was developed to determine locations and orientations of seismically active planes. Fault or joint planes are identified in what superficially appears to be an amorphous microearthquake location set. Five planes were determined when the three-point method was applied to a location data set for the massive hydraulic-fracturing experiment conducted in 1983. 23 refs., 19 figs., 3 tabs.

Dash, Z.V.; Grant, T.; Jones, G.; Murphy, H.D.; Wilson, M.G.

1989-02-01T23:59:59.000Z

406

Lockheed Martin Energy Systems, Inc., Groundwater Program Office. Annual report for fiscal year 1994  

SciTech Connect (OSTI)

This edition of the Lockheed Martin Energy Systems, Inc., (Energy Systems) Groundwater Program Annual Report summarizes the work carried out by the Energy Systems Groundwater Program Office (GWPO) for fiscal year (FY) 1994. The GWPO is responsible for coordination and oversight for all components of the groundwater programs at the three Oak Ridge facilities [Oak Ridge National Laboratory (ORNL), the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants (PGDP and PORTS, respectively.) This report describes the administrative framework of the GWPO including staffing, organization, and funding sources. In addition, summaries are provided of activities involving the Technical Support staff at the five facilities. Finally, the results of basic investigations designed to improve our understanding of the major processes governing groundwater flow and contaminant migration on the Oak Ridge Reservation (ORR) are reported. These investigations are conducted as part of the Oak Ridge Reservation Hydrology and Geology Studies (ORRHAGS) program. The relevance of these studies to the overall remediation responsibilities of Energy Systems is discussed.

NONE

1994-09-30T23:59:59.000Z

407

Documentation for fiscal year 1995 annual BUSS cask SARP testing and inspections  

SciTech Connect (OSTI)

The purpose of this report is to compile the data generated during the Fiscal Year (FY) 1995 annual tests and inspections performed on the Beneficial Uses Shipping System (BUSS) cask. The BUSS Cask Model R-1 is a type B shipping container used for shipment of radioactive cesium-137 and strontium-90 capsules to Waste Encapsulation and Storage Facility (WESF). The primary purpose of the BUSS Cask is to provide shielding and confinement as well as impact, puncture, and thermal protection for the capsules under both normal and accident conditions. Section 8.2 ``Maintenance and Periodic Inspection Program`` of the BUSS Cask SARP requires that the following tests and inspections be performed on an annual basis: hydrostatic pressure test; helium leak test; dye penetrant test on the trunnions and life lugs; torque test on all permanent bolts; and impact limiter inspection and weight test. In addition to compiling the generated data, this report will verify that the testing criteria identified in section 8.2 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met.

Saueressig, P.T.

1994-11-08T23:59:59.000Z

408

Idaho National Laboratory Cultural Resource Monitoring Report for Fiscal Year 2007  

SciTech Connect (OSTI)

This report describes the cultural resource monitoring activities of the Idaho National Laboratory’s (INL) Cultural Resource Management (CRM) Office during fiscal year 2007 (FY 2007). In FY 2007, 40 localities were revisited: two locations of heightened Shoshone-Bannock tribal sensitivity, four caves, three butte/craters, twelve prehistoric archaeological sites, two historic stage stations, nine historic homesteads, a portion of Goodale’s Cutoff of the Oregon Trail, a portion of historic trail T-16, one World War II dump, four buildings from the World War II period, and Experimental Breeder Reactor –I, a modern scientific facility and National Historic Landmark. Several INL project areas were also monitored in FY 2007. This included direct observation of ground disturbing activities within the Power Burst Facility (PBF, now designated as the Critical Infrastructure Test Range Complex – CITRC), backfilling operations associated with backhoe trenches along the Big Lost River, and geophysical surveys designed to pinpoint subsurface unexploded ordnance in the vicinity of the Naval Ordnance Disposal Area. Surprise checks were also made to three ongoing INL projects to ensure compliance with INL CRM Office recommendations to avoid impacts to cultural resources. Although some impacts were documented, no significant adverse effects that would threaten the National Register eligibility of any resource were observed at any location.

Brenda R. Pace

2007-10-01T23:59:59.000Z

409

Report to Congress on abnormal occurrences: Fiscal year 1996. Volume 19  

SciTech Connect (OSTI)

Section 208 of the Energy Reorganization Act of 1974 (PL 93-438) identifies an abnormal occurrence (AO) as an unscheduled incident or event that the Nuclear Regulatory Commission (NRC) determines to be significant from the standpoint of public health or safety. The Federal Reports Elimination and Sunset Act of 1995 (PL 104-66) requires that AOs be reported to Congress on an annual basis. This report includes those events that NRC determined to be AOs during fiscal year 1996. This report addresses eighteen AOs at NRC-licensed facilities. Two involved events at nuclear power plants, eleven involved medical brachytherapy misadministrations, and five involved radiopharmaceutical misadministrations. Eight AOs submitted by the Agreement States are included. One involved stolen radiography cameras, one involved a ruptured source, one involved release of radioactive material while being transported, one involved a lost source, two involved medical brachytherapy misadministrations, and two involved radiopharmaceutical misadministrations. Four updates of previously reported AOs are included in this report. Three ``Other Events of Interest`` events are being reported, and one previously reported ``Other Events of Interest`` event is being updated.

NONE

1997-04-01T23:59:59.000Z

410

Overview of Fiscal Year 2002 Research and Development for Savannah River Site's Salt Waste Processing Facility  

SciTech Connect (OSTI)

The Department of Energy's (DOE) Savannah River Site (SRS) high-level waste program is responsible for storage, treatment, and immobilization of high-level waste for disposal. The Salt Processing Program (SPP) is the salt (soluble) waste treatment portion of the SRS high-level waste effort. The overall SPP encompasses the selection, design, construction and operation of treatment technologies to prepare the salt waste feed material for the site's grout facility (Saltstone) and vitrification facility (Defense Waste Processing Facility). Major constituents that must be removed from the salt waste and sent as feed to Defense Waste Processing Facility include actinides, strontium, cesium, and entrained sludge. In fiscal year 2002 (FY02), research and development (R&D) on the actinide and strontium removal and Caustic-Side Solvent Extraction (CSSX) processes transitioned from technology development for baseline process selection to providing input for conceptual design of the Salt Waste Processing Facility. The SPP R&D focused on advancing the technical maturity, risk reduction, engineering development, and design support for DOE's engineering, procurement, and construction (EPC) contractors for the Salt Waste Processing Facility. Thus, R&D in FY02 addressed the areas of actual waste performance, process chemistry, engineering tests of equipment, and chemical and physical properties relevant to safety. All of the testing, studies, and reports were summarized and provided to the DOE to support the Salt Waste Processing Facility, which began conceptual design in September 2002.

H. D. Harmon, R. Leugemors, PNNL; S. Fink, M. Thompson, D. Walker, WSRC; P. Suggs, W. D. Clark, Jr

2003-02-26T23:59:59.000Z

411

Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance.

NONE

1995-09-01T23:59:59.000Z

412

Using mixed-initiative human-robot interaction to bound performance in a search task  

SciTech Connect (OSTI)

Mobile robots are increasingly used in dangerous domains, because they can keep humans out of harm’s way. Despite their advantages in hazardous environments, their general acceptance in other less dangerous domains has not been apparent and, even in dangerous environments, robots are often viewed as a “last-possible choice.” In order to increase the utility and acceptance of robots in hazardous domains researchers at the Idaho National Laboratory have both developed and tested novel mixed-initiative solutions that support the human-robot interactions. In a recent “dirty-bomb” experiment, participants exhibited different search strategies making it difficult to determine any performance benefits. This paper presents a method for categorizing the search patterns and shows that the mixed-initiative solution decreased the time to complete the task and decreased the performance spread between participants independent of prior training and of individual strategies used to accomplish the task.

Curtis W. Nielsen; Douglas A. Few; Devin S. Athey

2008-12-01T23:59:59.000Z

413

Toward the Development of Cognitive Task Difficulty Metrics to Support Intelligence Analysis Research  

SciTech Connect (OSTI)

Intelligence analysis is a cognitively complex task that is the subject of considerable research aimed at developing methods and tools to aid the analysis process. To support such research, it is necessary to characterize the difficulty or complexity of intelligence analysis tasks in order to facilitate assessments of the impact or effectiveness of tools that are being considered for deployment. A number of informal accounts of ''What makes intelligence analysis hard'' are available, but there has been no attempt to establish a more rigorous characterization with well-defined difficulty factors or dimensions. This paper takes an initial step in this direction by describing a set of proposed difficulty metrics based on cognitive principles.

Greitzer, Frank L.

2005-08-08T23:59:59.000Z

414

A distributed Approach for Access and Visibility Task under Ergonomic Constraints with a Manikin in a Virtual Reality Environment  

E-Print Network [OSTI]

This paper presents a new method, based on a multi-agent system and on digital mock-up technology, to assess an efficient path planner for a manikin for access and visibility task under ergonomic constraints. In order to solve this problem, the human operator is integrated in the process optimization to contribute to a global perception of the environment. This operator cooperates, in real-time, with several automatic local elementary agents. The result of this work validates solutions brought by digital mock-up and that can be applied to simulate maintenance task.

Bidault, Florence; Chedmail, Patrick; Pino, Laurent

2007-01-01T23:59:59.000Z

415

The coupling between eye movements and cognition varies with the task at hand. In tasks like reading, the eyes  

E-Print Network [OSTI]

The coupling between eye movements and cognition varies with the task at hand. In tasks like reading, the eyes are "the window to the soul," moving with each step of the underlying process, the coupling is looser. People tend to look at certain locations, but the sequence of eye movements

Logan, Gordon D.

416

Tasking with Out oTasking with Out-o TLS Chip Mult  

E-Print Network [OSTI]

and 26% more energy #12;25University of Illinois Jose Renau Columbia Faculty Candidate Colloquium March Torrellas University of Illinois at Urba http://iacoma.cs.uiuc.edu of Order Spawn inof-Order Spawn-Champaign #12;2University of Illinois Jose Renau Columbia Faculty Candidate Colloquium March 2004 Technology

Torrellas, Josep

417

Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11  

SciTech Connect (OSTI)

The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

Moore, D.A.

1994-09-01T23:59:59.000Z

418

MORA: an Energy-Aware Slack Reclamation Scheme for Scheduling Sporadic Real-Time Tasks upon Multiprocessor Platforms  

E-Print Network [OSTI]

In this paper, we address the global and preemptive energy-aware scheduling problem of sporadic constrained-deadline tasks on DVFS-identical multiprocessor platforms. We propose an online slack reclamation scheme which profits from the discrepancy between the worst- and actual-case execution time of the tasks by slowing down the speed of the processors in order to save energy. Our algorithm called MORA takes into account the application-specific consumption profile of the tasks. We demonstrate that MORA does not jeopardize the system schedulability and we show by performing simulations that it can save up to 32% of energy (in average) compared to execution without using any energy-aware algorithm.

Nelis, Vincent

2009-01-01T23:59:59.000Z

419

Electric Vehicle Preparedness Task 3: Detailed Assessment of Target Electrification Vehicles at Joint Base Lewis McChord Utilization  

SciTech Connect (OSTI)

Task 2 involved identifying daily operational characteristics of select vehicles and initiating data logging of vehicle movements in order to characterize the vehicle’s mission. Individual observations of these selected vehicles provide the basis for recommendations related to PEV adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements and provides observations related to placement of PEV charging infrastructure. This report provides the results of the data analysis and observations related to the replacement of current vehicles with PEVs. This fulfills part of the Task 3 requirements. Task 3 also includes an assessment of charging infrastructure required to support this replacement. That is the subject of a separate report.

Stephen Schey; Jim Francfort

2014-08-01T23:59:59.000Z

420

A point of order 8  

E-Print Network [OSTI]

A formula expressing a point of order 8 on an elliptic curve, in terms of the roots of the associated cubic polynomial, is given. Doubling such a point yields a point of order 4 distinct from the well-known points of order 4 given in standard references such as "A course of Modern Analysis" by Whittaker and Watson.

Semjon Adlaj

2011-10-03T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Sequential tasks performed by catalytic pumps for colloidal crystallization  

E-Print Network [OSTI]

Gold-platinum catalytic pumps immersed in a chemical fuel are used to manipulate silica colloids. The manipulation relies on the electric field and the fluid flow generated by the pump. Catalytic pumps perform various tasks, such as the repulsion of colloids, the attraction of colloids, and the guided crystallization of colloids. We demonstrate that catalytic pumps can execute these tasks sequentially over time. Switching from one task to the next is related to the local change of the proton concentration, which modifies the colloid zeta potential and consequently the electric force acting on the colloids.

Ali Afshar Farniya; Maria J. Esplandiu; Adrian Bachtold

2014-10-20T23:59:59.000Z

422

Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2012  

SciTech Connect (OSTI)

Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance, and to some extent, experiment management, are inconsistent with the state of modern nuclear engineering practice, and are difficult, if not impossible, to properly verify and validate (V&V) according to modern standards. Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In late 2009, the Idaho National Laboratory (INL) initiated a focused effort, the ATR Core Modeling Update Project, to address this situation through the introduction of modern high-fidelity computational software and protocols. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF). The ATR Core Modeling Update Project, targeted for full implementation in phase with the next anticipated ATR Core Internals Changeout (CIC) in the 2014-2015 time frame, began during the last quarter of Fiscal Year 2009, and has just completed its third full year. Key accomplishments so far have encompassed both computational as well as experimental work. A new suite of stochastic and deterministic transport theory based reactor physics codes and their supporting nuclear data libraries (HELIOS, KENO6/SCALE, NEWT/SCALE, ATTILA, and an extended implementation of MCNP5) has been installed at the INL under various licensing arrangements. Corresponding models of the ATR and ATRC are now operational with all five codes, demonstrating the basic feasibility of the new code packages for their intended purpose. Of particular importance, a set of as-run core depletion HELIOS calculations for all ATR cycles since August 2009, Cycle 145A through Cycle 151B, was successfully completed during 2012. This major effort supported a decision late in the year to proceed with the phased incorporation of the HELIOS methodology into the ATR Core Safety Analysis Package (CSAP) preparation process, in parallel with the established PDQ-based methodology, beginning late in Fiscal Year 2012. Acquisition of the advanced SERPENT (VTT-Finland) and MC21 (DOE-NR) Monte Carlo stochastic neutronics simulation codes was also initiated during the year and some initial applications of SERPENT to ATRC experiment analysis were demonstrated. These two new codes will offer significant additional capability, including the possibility of full-3D Monte Carlo fuel management support capabilities for the ATR at some point in the future. Finally, a capability for rigorous sensitivity analysis and uncertainty quantification based on the TSUNAMI system has been implemented and initial computational results have been obtained. This capability will have many applications as a tool for understanding the margins of uncertainty in the new models as well as for validation experiment design and interpretation.

David W. Nigg, Principal Investigator; Kevin A. Steuhm, Project Manager

2012-09-01T23:59:59.000Z

423

Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993  

SciTech Connect (OSTI)

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

Not Available

1993-12-01T23:59:59.000Z

424

Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995  

SciTech Connect (OSTI)

This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

NONE

1995-12-01T23:59:59.000Z

425

Facilitation of the Estuary/Ocean Subgroup and the Expert Regional Technical Group, Fiscal Year 2014 Annual Report  

SciTech Connect (OSTI)

This document is the annual report for fiscal year 2014 for the project called Facilitation of the Estuary/Ocean Subgroup (EOS) and the Expert Regional Technical Group (ERTG). Pacific Northwest National Laboratory (PNNL) conducted the project for the Bonneville Power Administration. The EOS and ERTG are part of the research, monitoring, and evaluation and habitat restoration efforts, respectively, developed by the Action Agencies (BPA, U.S. Army Corps of Engineers) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System and implemented under the Columbia Estuary Ecosystem Restoration Program.

Johnson, Gary E.

2014-09-01T23:59:59.000Z

426

Compendium of Data for the Hanford Site (Fiscal Years 2004 to 2008) Applicable to Estimation of Recharge Rates  

SciTech Connect (OSTI)

This report is a compendium of recharge data collected in Fiscal Years 2004 through 2008 at various soil and surface covers found and planned in the 200 West and 200 East Areas of the U.S. Department of Energy’s Hanford Site in southeast Washington State. The addition of these new data to previously published recharge data will support improved estimates of recharge with respect to location and soil cover helpful to evaluations and risk assessments of radioactive and chemical wastes at this site. Also presented are evaluations of the associated uncertainties, limitations, and data gaps in the existing knowledge base for recharge at the Hanford Site.

Nichols, William E.; Rockhold, Mark L.; Downs, Janelle L.

2008-09-24T23:59:59.000Z

427

Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1  

SciTech Connect (OSTI)

Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

Not Available

1993-12-22T23:59:59.000Z

428

Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

NONE

1998-05-01T23:59:59.000Z

429

Annual summary report on the surveillance and maintenance activities for the Oak Rige National Laboratory Environmental Restoration Program for fiscal year 1995  

SciTech Connect (OSTI)

This Annual Summary Report on the Surveillance and Maintenance Activities for the Oak Ridge National Laboratory Environmental Restoration Program for Fiscal Year 1995 was prepared to communicate the accomplishments of the Program during fiscal year 1995. This work was performed under work breakdown structure element 1.4.12.6.1.14.20 (activity data sheet 3314, ``Remedial Action Surveillance and Maintenance``). Publication of this document meets the Life Cycle Baseline milestone date of November 30, 1995. This document provides the accomplishments for both the Remedial Action and Decontamination and Decommissioning Surveillance and Maintenance programs.

NONE

1995-11-01T23:59:59.000Z

430

Accelerator and Fusion Research Division annual report, October 1980-September 1981. Fiscal year, 1981  

SciTech Connect (OSTI)

Major accomplishments during fiscal year 1981 are presented. During the Laboratory's 50th anniversary celebrations, AFRD and the Nuclear Science Division formally dedicated the new (third) SuperHILAC injector that adds ions as heavy as uranium to the ion repertoire at LBL's national accelerator facilities. The Bevalac's new multiparticle detectors (the Heavy Ion Spectrometer System and the GSI-LBL Plastic Ball/Plastic Wall) were completed in time to take data before the mid-year shutdown to install the new vacuum liner, which passed a milestone in-place test with flying colors in September. The Bevalac biomedical program continued patient treatment with neon beams aimed at establishing a complete data base for a dedicated biomedical accelerator, the design of which NCI funded during the year. Our program to develop alternative Isabelle superconducting dipole magnets, which DOE initiated in FY80, proved the worth of a new magnet construction technique and set a world record - 7.6 Tesla at 1.8 K - with a model magnet in our upgraded test facility. Final test results at LBL were obtained by the Magnetic Fusion Energy Group on the powerful neutral beam injectors developed for Princeton's TFTR. The devices exceeded the original design requirements, thereby completing the six-year, multi-million-dollar NBSTF effort. The group also demonstrated the feasibility of efficient negative-ion-based neutral beam plasma heating for the future by generating 1 A of negative ions at 34 kV for 7 seconds using a newly developed source. Collaborations with other research centers continued, including: (1) the design of LBL/Exxon-dedicated beam lines for the Stanford Synchrotron Radiation Laboratory; (2) beam cooling tests at Fermilab and the design of a beam cooling system for a proton-antiproton facility there; and (3) the development of a high-current betatron for possible application to a free electron laser.

Johnson, R.K.; Thomson, H.A. (eds.)

1982-04-01T23:59:59.000Z

431

Hot-dry-rock geothermal-energy development program. Annual report, fiscal year 1981  

SciTech Connect (OSTI)

During fiscal year 1981, activities of the Hot Dry Rock Geothermal Energy Development Program were concentrated in four principal areas: (1) data collection to permit improved estimates of the hot dry rock geothermal energy resource base of various regions of the United States and of the United States as a whole, combined with detailed investigations of several areas that appear particularly promising either for further energy extraction experiments or for future commercial development; (2) successful completion of a 9-month, continuous, closed-loop, recirculating flow test in the enlarged Phase I System at Fenton Hill, New Mexico - a pressurized-water heat-extraction loop developed in low-permeability granitic rock by hydraulic fracturing; (3) successful completion at a depth of 4084 m (13,933 ft) of well EE-3, the production well of a larger, deeper, and hotter, Phase II System at Fenton Hill. Well EE-3 was directionally drilled with control of both azimuth and inclination. Its inclined section is about 380 m (1250 ft) vertically above the injection well, EE-2, which was completed in FY80; and (4) supporting activities included new developments in downhole instrumentation and equipment, geochemical and geophysical studies, rock-mechanics and fluid-mechanics investigations, computer analyses and modeling, and overall system design. Under an International Energy Agency agreement, the New Energy Development Organization, representing the Government of Japan has joined Kernforschungsanlage-Juelich GmbH, representing the Federal Republic of Germany, and the US Department of Energy as an active participant in the Fenton Hill Hot Dry Rock Project.

Smith, M.C.; Ponder, G.M. (comps.)

1981-01-01T23:59:59.000Z

432

Second and Third Quarters Hanford Seismic Report for Fiscal Year 1999  

SciTech Connect (OSTI)

Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. Hanford Seismic Monitoring also locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The HSN and the Eastern Washington Regional Network (EWRN) consist of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. For the HSN, there were 270 triggers during the second quarter of fiscal year (FY) 1999 and 229 triggers during the third quarter on the primary recording system. During the second quarter, 22 seismic events were located; 11 were earthquakes in the Columbia River Basalt Group, 6 were earthquakes in the crystalline basement, and 5 were quarry blasts. Two earthquakes appear to be related to major geologic structures, eight earthquakes occurred in known swarm areas, and seven earthquakes were random occurrences. During the third quarter, 23 seismic events were located; 11 were earthquakes in the Columbia River Basalt Group, 4 were earthquakes in the pre-basalt sediments, 4 were earthquakes in the crystalline basement, and 4 were quarry blasts. Five earthquakes occurred in known swarm areas, six earthquakes formed a new swarm near the Horse Heavens Hills and Presser, Washington, and eight earthquakes were random occurrences. No earthquakes triggered the Hanford Strong Motion Accelerometers during the second or third quarters of FY 1999.

DC Hartshorn; SP Reidel; AC Rohay

1999-11-09T23:59:59.000Z

433

Isotope Production and Distribution Program`s Fiscal Year 1997 financial statement audit  

SciTech Connect (OSTI)

The Department of Energy Isotope Production and Distribution Program mission is to serve the national need for a reliable supply of isotope products and services for medicine, industry and research. The program produces and sells hundreds of stable and radioactive isotopes that are widely utilized by domestic and international customers. Isotopes are produced only where there is no U.S. private sector capability or other production capacity is insufficient to meet U.S. needs. The Department encourages private sector investment in new isotope production ventures and will sell or lease its existing facilities and inventories for commercial purposes. The Isotope Program reports to the Director of the Office of Nuclear Energy, Science and Technology. The Isotope Program operates under a revolving fund established by the Fiscal Year (FY) 1990 Energy and Water Appropriations Act and maintains financial viability by earning revenues from the sale of isotopes and services and through annual appropriations. The FY 1995 Energy and Water Appropriations Act modified predecessor acts to allow prices charged for Isotope Program products and services to be based on production costs, market value, the needs of the research community, and other factors. Although the Isotope Program functions as a business, prices set for small-volume, high-cost isotopes that are needed for research purposes may not achieve full-cost recovery. As a result, isotopes produced by the Isotope Program for research and development are priced to provide a reasonable return to the U.S. Government without discouraging their use. Commercial isotopes are sold on a cost-recovery basis. Because of its pricing structure, when selecting isotopes for production, the Isotope Program must constantly balance current isotope demand, market conditions, and societal benefits with its determination to operate at the lowest possible cost to U.S. taxpayers. Thus, this report provides a financial analysis of this situation.

NONE

1998-03-27T23:59:59.000Z

434

Waste Treatment Plant Support Program: Summaries of Reports Produced During Fiscal Years 1999-2010  

SciTech Connect (OSTI)

The Waste Treatment Plant (WTP) being built on the U.S. Department of Energy (DOE) Hanford Site will be the largest chemical processing plant in the United States. Bechtel National Inc. (BNI) is the designer and constructor for the WTP. The Pacific Northwest National Laboratory (PNNL) has provided significant research and testing support to the WTP. This report provides a summary of reports developed initially under PNNL’s “1831” use agreement and later PNNL’s “1830” prime contract with DOE in support of the WTP. In March 2001, PNNL under its “1831” use agreement entered into a contract with BNI to support their research and testing activities. However, PNNL support to the WTP predates BNI involvement. Prior to March 2001, PNNL supported British Nuclear Fuels Ltd. in its role as overall designer and constructor. In February 2007, execution of PNNL’s support to the WTP was moved under its “1830” prime contract with DOE. Documents numbered “PNWD-XXXX” were issued under PNNL’s “1831” use agreement. Documents numbered “PNNL-XXXX” were issued under PNNL’s “1830” prime contract with DOE. The documents are sorted by fiscal year and categorized as follows: ? Characterization ? HLW (High Level Waste) ? Material Characterization ? Pretreatment ? Simulant Development ? Vitrification ? Waste Form Qualification. This report is intended to provide a compendium of reports issued by PNWD/PNNL in support of the Waste Treatment Plant. Copies of all reports can be obtained by clicking on http://www.pnl.gov/rpp-wtp/ and downloading the .pdf file(s) to your computer.

Beeman, Gordon H.

2010-08-12T23:59:59.000Z

435

Robust and decentralized task assignment algorithms for UAVs  

E-Print Network [OSTI]

This thesis investigates the problem of decentralized task assignment for a fleet of UAVs. The main objectives of this work are to improve the robustness to noise and uncertainties in the environment and improve the ...

Alighanbari, Mehdi, 1976-

2007-01-01T23:59:59.000Z

436

Academic Science Program Task Force Tuesday, September 27, 2011  

E-Print Network [OSTI]

, Malecha and Weiss); Jeff Braden and Ira Weiss expressed interest in meeting with the task force 11/04/11 3-4:30 p.m. Williams Hall, Room 2215 · Surveys (via Qualtrics) o Went out to department

437

Inter-task cache sharing for compositional embedded multiprocessors  

E-Print Network [OSTI]

compostionality combined with cache efficiency. We per- form two partitioning types. First, each task and each, resulting in 10% execution time penalty compared with a conventional shared cache. Providing a shared cache

Kuzmanov, Georgi

438

Robust Execution of Bipedal Walking Tasks From Biomechanical Principles  

E-Print Network [OSTI]

Effective use of robots in unstructured environments requires that they have sufficient autonomy and agility to execute task-level commands successfully. A challenging example of such a robot is a bipedal walking machine. ...

Hofmann, Andreas

2006-04-28T23:59:59.000Z

439

Full-Arm Haptics in an Accessibility Task Matthew Frey  

E-Print Network [OSTI]

Full-Arm Haptics in an Accessibility Task Matthew Frey Department of Mechanical Engineering University of Utah David E. Johnson John Hollerbach School of Computing University of Utah ABSTRACT

Hollerbach, John M.

440

Biomedical Paper Task Decomposition of Laparoscopic Surgery for  

E-Print Network [OSTI]

tasks in MIS education is to teach the optimal application of instrument F/T necessary to conduct an operation. Although the acquisition of laparoscopic technical skill and the assessment of performance

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Dynamic Scheduling of Skippable Periodic Tasks: Issues and Proposals  

E-Print Network [OSTI]

-Chetto and Audrey Marchand IRCCyN, University of Nantes, Nantes, FRANCE Email: {maryline.chetto, audrey.marchand Scheduling of Skippable Periodic Tasks in Weakly-Hard Real-Time Systems," by M. Silly-Chetto, and A. Marchand

Paris-Sud XI, Université de

442

The "Task Approach" to Labor Markets: An Overview  

E-Print Network [OSTI]

An emerging literature argues that changes in the allocation of workplace “tasks” between capital and labor, and between domestic and foreign workers, has altered the structure of labor demand in industrialized countries ...

Author, David H.

2013-01-30T23:59:59.000Z

443

The "Task Approach" to Labor Markets" An Overview  

E-Print Network [OSTI]

An emerging literature argues that changes in the allocation of workplace “tasks” between capital and labor, and between domestic and foreign workers, has altered the structure of labor demand in industrialized countries ...

Autor, David

2013-01-24T23:59:59.000Z

444

Vision-based handling tasks for an autonomous outdoor forklift  

E-Print Network [OSTI]

(HMCs) perform the task of transporting molten aluminium from the smelter (where the aluminium is made the smelter (where the aluminium is made) to the casting house where it is turned into block products

Paris-Sud XI, Université de

445

ARI Task Force, ECA Work to Stimulate Regional Economies  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. – DOE’s Asset Revitalization Initiative (ARI) Task Force met with the Energy Communities Alliance (ECA) this week to advance the Department’s processes for transferring excess land...

446

Task Force on Climate Preparedness and Resilience Announces Tribal...  

Broader source: Energy.gov (indexed) [DOE]

and Indian Country Webinar Series On July 16, at the fourth and final meeting of the White House State, Local, and Tribal Leaders Task Force on Climate Preparedness and...

447

The Task of the Referee Alan Jay Smith  

E-Print Network [OSTI]

The Task of the Referee * Alan Jay Smith Computer Science Division EECS Department University professional. Typically, referees learn to ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ ¡ * Prof. Smith's research

Torr, Philip H. S.

448

United States of America Electric Energy Market Competition Task Force  

E-Print Network [OSTI]

, appointed by the Secretary of Energy; and (5) an employee of the Rural Utilities Service, appointedi United States of America Electric Energy Market Competition Task Force and the Federal Energy and Retail Markets for Electric Energy Docket No. AD05

Tesfatsion, Leigh

449

Robust execution of bipedal walking tasks from biomechanical principles  

E-Print Network [OSTI]

Effective use of robots in unstructured environments requires that they have sufficient autonomy and agility to execute task-level commands successfully. A challenging example of such a robot is a bipedal walking machine. ...

Hofmann, Andreas G. (Andreas Gunther)

2006-01-01T23:59:59.000Z

450

INTERIM REPORT OF THE TASK FORCE ON DOE NATIONAL LABORATORIES  

Broader source: Energy.gov [DOE]

The SEAB Task Force on DOE National Laboratories was established by the Secretary of Energy on June 16, 2014, to provide advice, guidance, and recommendations on important issues related to...

451

Report of the Fermilab ILC Citizens' Task Force  

SciTech Connect (OSTI)

Fermi National Accelerator Laboratory convened the ILC Citizens' Task Force to provide guidance and advice to the laboratory to ensure that community concerns and ideas are included in all public aspects of planning and design for a proposed future accelerator, the International Linear Collider. In this report, the members of the Task Force describe the process they used to gather and analyze information on all aspects of the proposed accelerator and its potential location at Fermilab in northern Illinois. They present the conclusions and recommendations they reached as a result of the learning process and their subsequent discussions and deliberations. While the Task Force was charged to provide guidance on the ILC, it became clear during the process that the high cost of the proposed accelerator made a near-term start for the project at Fermilab unlikely. Nevertheless, based on a year of extensive learning and dialogue, the Task Force developed a series of recommendations for Fermilab to consider as the laboratory develops all successor projects to the Tevatron. The Task Force recognizes that bringing a next-generation particle physics project to Fermilab will require both a large international effort and the support of the local community. While the Task Force developed its recommendations in response to the parameters of a future ILC, the principles they set forth apply directly to any large project that may be conceived at Fermilab, or at other laboratories, in the future. With this report, the Task Force fulfills its task of guiding Fermilab from the perspective of the local community on how to move forward with a large-scale project while building positive relationships with surrounding communities. The report summarizes the benefits, concerns and potential impacts of bringing a large-scale scientific project to northern Illinois.

None

2008-06-01T23:59:59.000Z

452

Task 1—Steam Oxidation (NETL-US)  

SciTech Connect (OSTI)

The proposed steam in let temperature in the Advanced Ultra Supercritical (A·USC) steam turbine is high enough (760°C) Ihat traditional turbine casing and valve body materials such as ferr;tic/manensitic steels will not suffice due to temperature lim itations of this class of materials. Cast versions of three traditionally wrought Ni-based superalloys (Haynes 263. Haynes 282, and Nimonic 105) were evaluated for use as casing or valve components for the next generation of industrial steam turbines. The full size castings are substantia l: 2-5,000 kg each half and on the order of 100 nun thick. Experimental castings were quite a bit smaller, but section size was retained and cooling rate controlled to produce equi valem microslruclUre •. A multi_step homogenization heat treatment was d~ve loped to better disperse the al loy constituents. These castings were subsequently evaluated by characterizing their microstructure as well as their steam oxidation resistance (al 760 and 800 "C).

G. R. Holcomb

2010-05-01T23:59:59.000Z

453

ORDER  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced ScorecardReactor TechnologyOFFICE: NEPA REVIEWS:EnergyORAU

454

RESUMEN EJECUTIVO El objetivo del trabajo bajo el Operativo 5 (Task Order 5) para los Centros de  

E-Print Network [OSTI]

se utilizan en el análisis de revisión para las emisiones de rutina y episódicas tienden a maximizar las emisiones de la rutina de operación separada de las emisiones episódicas por las diferentes suposiciones y métodos utilizados para evaluar su potencial de importancia. Para las emisiones de la rutina de

455

Perceptionaction coupling in an interceptive task: First-order time-to-contact as an input variable  

E-Print Network [OSTI]

of Experimental Psychology: Human Perception and Performance, 20, 591±612; Bootsma, R. J., Fayt, V., Zaal, F. T. J. M., & Laurent, M. (1997). Journal of Experimental Psychology: Human Perception and Performance, 23 could be explained. � 2000 Elsevier Science B.V. All rights reserved. Human Movement Science 19 (2000

Jirsa, Viktor

456

Attachment J-16 Portfolio Management Task Order 13-002 Title: DOE-HQ Security System Review and Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program Cumulus Humilis Aerosol STATEMENT OFCHPRC

457

Fiscal Year 1998 Annual Report, Carbon Dioxide Information Analysis Center, World Data Center -- A for Atmospheric Trace Gases  

SciTech Connect (OSTI)

Once again, the most recent fiscal year was a productive one for the Carbon Dioxide Information Analysis Center (CDIAC) at Oak Ridge National Laboratory (ORNL), as well as a year for change. The FY 1998 in Review section in this report summarizes quite a few new and updated data and information products, and the ''What's Coming in FY 1999'' section describes our plans for this new fiscal year. During FY 1998, CDIAC began a data-management system for AmeriFlux, a long-term study of carbon fluxes between the terrestrial biosphere of the Western Hemisphere and the atmosphere. The specific objectives of AmeriFlux are to establish an infrastructure for guiding, collecting, synthesizing, and disseminating long-term measurements of CO{sub 2}, water, and energy exchange from a variety of ecosystems; collect critical new information to help define the current global CO{sub 2} budget; enable improved predictions of future concentrations of atmospheric CO{sub 2}; and enhance understanding of carbon fluxes. Net Ecosystem Production (NEP), and carbon sequestration in the terrestrial biosphere. The data-management system, available from CDIAC'S AmeriFlux home page (http://cdiac.esd.ornl.gov/programs/ameriflux/ ) is intended to provide consistent, quality-assured, and documented data across all AmeriFlux sites in the US, Canada, Costa Rica, and Brazil. It is being developed by Antoinette Brenkert and Tom Boden, with assistance from Susan Holladay (who joined CDIAC specifically to support the AmeriFlux data-management effort).

Cushman, R.M.; Boden, T.A.; Hook, L.A.; Jones, S.B.; Kaiser, D.P.; Nelson, T.R.

1999-03-01T23:59:59.000Z

458

Order 430.1D  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management. 4. IMPLEMENTATION a. The requirements can be found in the document listed in Section 6 of this order. The Office of Institutional Operations through the Site...

459

Potential Benefits and Costs of Concurrent Task Engagement to Maintain Vigilance: A Driving Simulator Investigation  

E-Print Network [OSTI]

Objective: The objective of this study was to investigate the nature of concurrent task interference during a vigilance task and to determine whether a concurrent task improves performance with decreased vigilance. ...

Atchley, Paul; Chan, Mark Sai Leong

2011-01-01T23:59:59.000Z

460

DESCRIPTION OF ACTIVITIES AND SELECTED RESULTS FOR THE U.S. DEPARTMENT OF ENERGY S CLEAN ENERGY APPLICATION CENTERS: FISCAL YEAR 2010  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) sponsors a set of Clean Energy Application Centers that promote the development and deployment of clean energy technologies. There are eight regional centers that provide assistance for specific areas of the country plus a separate center operated by the International District Energy Association that provides technical assistance on district energy issues and applications to the regional centers. The original focus of the centers was on combined heat and power (CHP) alone but, beginning in fiscal year 2010, their scope expanded to include district energy systems and waste heat recovery. At that time, the official name of the centers changed from CHP Regional Application Centers (RACs) to Clean Energy Application Centers, and their number was expanded to include the previously-mentioned center focusing on district energy. Oak Ridge National Laboratory (ORNL) has performed two previous studies of RAC activities. The first one examined what the RACs had done each year from the initiation of the program through fiscal year (FY) 2008 and the second one examined RAC activities for the 2009 fiscal year. The most recent study, described in this report, examines what was accomplished in fiscal year 2010, the first year since the RACs expanded their focus and changed their name to Clean Energy Application Centers.

Schweitzer, Martin [ORNL

2011-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Deep Vadose Zone-Applied Field Research Initiative Fiscal Year 2011 Annual Report  

SciTech Connect (OSTI)

This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2011. The Department of Energy (DOE) Office of Technology Innovation and Development's (OTID) mission is to transform science into viable solutions for environmental cleanup. In 2010, OTID developed the Impact Plan, Science and Technology to Reduce the Life Cycle Cost of Closure to outline the benefits of research and development of the lifecycle cost of cleanup across the DOE complex. This plan outlines OTID's ability to reduce by $50 billion, the $200 billion life-cycle cost in waste processing, groundwater and soil, nuclear materials, and deactivation and decommissioning. The projected life-cycle costs and return on investment are based on actual savings realized from technology innovation, development, and insertion into remedial strategies and schedules at the Fernald, Mound, and Ashtabula sites. To achieve our goals, OTID developed Applied Field Research Initiatives to facilitate and accelerate collaborative development and implementation of new tools and approaches that reduce risk, cost and time for site closure. The primary mission of the Deep Vadose Zone-Applied Field Research Initiative (DVZ-AFRI) is to protect our nation's water resources, keeping them clean and safe for future generations. The DVZ-AFRI was established for the DOE to develop effective, science-based solutions for remediating, characterizing, monitoring, and predicting the behavior and fate of deep vadose zone contamination. Subsurface contaminants include radionuclides, metals, organics, and liquid waste that originated from various sources, including legacy waste from the nation's nuclear weapons complexes. The DVZ-AFRI project team is translating strategy into action by working to solve these complex challenges in a collaborative environment that leverages technology and scientific expertise from DOE, Pacific Northwest National Laboratory, CH2M HILL Plateau Remediation Company, and the broad scientific research community. As project manager for the DVZ-AFRI, I have had the privilege this past year to team with creative, talented members of the scientific community nationwide to develop effective long-term solutions to address deep vadose zone contamination. This report highlights how the DVZ-AFRI project team is delivering results by achieving significant programmatic accomplishments, and developing and field-testing transformational technologies to address the nation's most pressing groundwater and vadose zone contamination problems.

Wellman, Dawn M.; Johnson, Timothy C.; Smith, Ronald M.; Truex, Michael J.; Matthews, Hope E.

2011-10-01T23:59:59.000Z

462

Economic Impact of Pacific Northwest National Laboratory on the State of Washington in Fiscal Year 2013  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) is a large economic entity, with $1.06 billion in annual funding, $936 million in total spending, and 4,344 employees in fiscal year (FY) 2013. Four thousand, one hundred and one (4,101) employees live in Washington State. The Laboratory directly and indirectly supports almost $1.31 billion in economic output, 6,802 jobs, and $514 million in Washington State wage income from current operations. The state also gains more than $1.21 billion in output, more than 6,400 jobs, and $459 million in income through closely related economic activities, such as visitors, health care spending, spending by resident retirees, and spinoff companies. PNNL affects Washington’s economy through commonly recognized economic channels, including spending on payrolls and other goods and services that support Laboratory operations. Less-commonly recognized channels also have their own impacts and include company-supported spending on health care for its staff members and retirees, spending of its resident retirees, Laboratory visitor spending, and the economic activities in a growing constellation of “spinoff” companies founded on PNNL research, technology, and managerial expertise. PNNL also has a significant impact on science and technology education and community nonprofit organizations. PNNL is an active participant in the future scientific enterprise in Washington with the state’s K-12 schools, colleges, and universities. The Laboratory sends staff members to the classroom and brings hundreds of students to the PNNL campus to help train the next generation of scientists, engineers, mathematicians, and technicians. This investment in human capital, though difficult to measure in terms of current dollars of economic output, is among the important lasting legacies of the Laboratory. Finally, PNNL contributes to the local community with millions of dollars’ worth of cash and in-kind corporate and staff contributions, all of which strengthen the economy. This report quantifies these effects, providing detailed information on PNNL’s revenues and expenditures, as well as the impacts of its activities on the rest of the Washington State economy. This report also describes the impacts of the four closely related activities: health care spending, spinoff companies with roots in PNNL, visitors to the Laboratory, and PNNL retirees.

Scott, Michael J.; Niemeyer, Jackie M.

2014-12-18T23:59:59.000Z

463

Development of a personal computer-based secondary task procedure as a surrogate for a driving simulator  

E-Print Network [OSTI]

and in the Texas Transportation Institute?s (TTI?s) Driving Environment Simulator. The subjects were iv subdivided into three subgroups to compare performance between the driving simulator and the PCSP with respect to differences in reading times.../second secondary task display rate. The few differences between the three display rates revealed no trends, and indicated that all three of the versions of the PCSP seem acceptable for use in studying CMS messages in order to find comparable results to TTI...

Schrock, Steven Dale

2009-05-15T23:59:59.000Z

464

E-Print Network 3.0 - association task force Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Report Summary: November 2000 Remanufactured Device Task Force Releases Report By Juana Williams In August 2000... , the Remanufactured Device Task Force to the NCWM...

465

Report of the SEAB Task Force on Technology Development for Environmen...  

Office of Environmental Management (EM)

Report of the SEAB Task Force on Technology Development for Environmental Management. Report of the SEAB Task Force on Technology Development for Environmental Management. This...

466

E-Print Network 3.0 - agripower project task Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sciences 30 A Framework for Designing Intelligent Task-Oriented Augmented Reality User Interfaces Summary: benefit from augmented reality projection to inform and direct tasks,...

467

E-Print Network 3.0 - attention demanding tasks Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

tion task... -13 (post-target). An ANOVA on ... Source: Jiang, Yuhong - Department of Psychology, University of Minnesota Collection: Biology and Medicine 26 Task-Evoked...

468

Task 3.0: Advanced power systems. Semi-annual report, April 1--June 30, 1993  

SciTech Connect (OSTI)

A variety of activities are incorporated into the Advanced Power Systems program. Tasks included are (1) fuel utilization properties, (2) pressurized combustion, (3) catalytic gasification, and (4) hot-gas cleanup. ATRAN is stochastic and combines initial coal inorganics in a random manner in order to predict the resulting fly ash particle size and composition. ASHPERT, is an expert system yielding a first-order estimate of fly ash size and composition. Both models are designed to emulate pulverized-coal combustion. Input data required include identity, chemistry, size, quantity, and mineral-to-coal associations. The pressurized combustion task has focused on the construction of a versatile reactor system to simulate pressurized fluidized-bed combustion. Both castable and monolithic refractories have been investigated in determining slag prevention under a variety of conditions. Catalytic gasification coupled with a molten carbonate fuel cell offers an extremely efficient and environmentally sound power generating system using coal. Work with an Illinois No. 6 bituminous coal has not been successful. Continued efforts will focus on using the more reactive low-rank coals to try to achieve this goal. Hot-gas cleanup is the critical issue in many of the proposed advanced power system operations on coal. The key to successful ash removal is an understanding of the properties of the ash to be collected as well as the interactions of this material with the barrier itself. The knowledge base under development will assist in assessing many of these barrier material issues for a variety of coal ashes.

McCollor, D.P.; Zygarlicke, C.J.; Mann, M.D.; Willson, W.G.; Hurley, J.P.

1993-07-01T23:59:59.000Z

469

A comparative critical analysis of modern task-parallel runtimes.  

SciTech Connect (OSTI)

The rise in node-level parallelism has increased interest in task-based parallel runtimes for a wide array of application areas. Applications have a wide variety of task spawning patterns which frequently change during the course of application execution, based on the algorithm or solver kernel in use. Task scheduling and load balance regimes, however, are often highly optimized for specific patterns. This paper uses four basic task spawning patterns to quantify the impact of specific scheduling policy decisions on execution time. We compare the behavior of six publicly available tasking runtimes: Intel Cilk, Intel Threading Building Blocks (TBB), Intel OpenMP, GCC OpenMP, Qthreads, and High Performance ParalleX (HPX). With the exception of Qthreads, the runtimes prove to have schedulers that are highly sensitive to application structure. No runtime is able to provide the best performance in all cases, and those that do provide the best performance in some cases, unfortunately, provide extremely poor performance when application structure does not match the scheduler's assumptions.

Wheeler, Kyle Bruce; Stark, Dylan; Murphy, Richard C. [Micron Technology, Inc., Boise, ID

2012-12-01T23:59:59.000Z

470

Inert Anode/Cathode Program: Fiscal Year 1986 annual report. [For Hall-Heroult cells  

SciTech Connect (OSTI)

Purpose of the program is to develop long-lasting, energy-efficient anodes, cathodes, and ancillary equipment for Hall-Heroult cells used by the aluminum industry. The program is divided into four tasks: Inert Anode Development, Cathode Materials Evaluation, Cathode Bonding Development, and Sensor Development. To devise sensors to control the chemistry of Hall-Heroult cells using stable anodes and cathodes. This report highlights the major FY86 technical accomplishments, which are presented in the following sections: Management, Materials Development, Materials Evaluation, Thermodynamic Evaluation, Laboratory Cell Tests, Large-Scale Tests, Cathode Materials Evaluation, Cathode Bonding Development, and Sensor Development.

Brenden, B.B.; Davis, N.C.; Koski, O.H.; Marschman, S.C.; Pool, K.H.; Schilling, C.H.; Windisch, C.F.; Wrona, B.J.

1987-06-01T23:59:59.000Z

471

Chimera order in spin systems  

E-Print Network [OSTI]

Homogeneous populations of oscillators have recently been shown to exhibit stable coexistence of coherent and incoherent regions. Generalizing the concept of chimera states to the context of order-disorder transition in systems at thermal equilibrium, we show analytically that such complex ordering can appear in a system of Ising spins, possibly the simplest physical system exhibiting this phenomenon. We also show numerically the existence of chimera ordering in 3-dimensional spin systems that model layered magnetic materials, suggesting possible means of experimentally observing such states.

Rajeev Singh; Subinay Dasgupta; Sitabhra Sinha

2010-11-23T23:59:59.000Z

472

Job Task Analysis: Energy Manager; November 2013 - December 2014  

SciTech Connect (OSTI)

This report describes the process for and results of a comprehensive job task analysis of Energy Managers. This study was performed by Professional Testing on behalf of the National Renewable Energy Laboratory (NREL). The competency (domains, tasks and associated knowledge) list, which defines the work performed by practitioners, was initially developed by a representative panel of practitioners during a meeting held on January 22?24, 2014 in Orlando Florida. Following the identification of the job tasks and associated knowledge and skills, a validation survey was conducted of the finding of the JTA and the results of the validation study were reviewed by a representative panel of practitioners during a conference call held on June 2, 2014. The committee finalized the JTA and examination blueprints for the Energy Manager credential scheme based on the survey results.

Woodley, C. D.

2015-01-01T23:59:59.000Z

473

Job Task Analysis: Building Operations Professional; February - December 2014  

SciTech Connect (OSTI)

This report describes the process for and results of a comprehensive job task analysis of Building Operations Professionals. This study was performed by Professional Testing on behalf of the National Renewable Energy Laboratory (NREL). The competency (domains, tasks and associated knowledge) list, which defines the work performed by practitioners, was initially developed by a representative panel of practitioners during a meeting held on February 10-12, 2014 in Orlando Florida. Following the identification of the job tasks and associated knowledge and skills, a validation survey was conducted of the finding of the JTA and the results of the validation study were reviewed by a representative panel of practitioners during a conference call held on May 30, 2014. The committee finalized the JTA and examination blueprints for the Building Operations Professional credential scheme based on the survey results.

Woodley, C. D.

2015-01-01T23:59:59.000Z

474

Job Task Analysis: Building Commissioning Professional; November 2013 - December 2014  

SciTech Connect (OSTI)

This report describes the process for and results of a comprehensive job task analysis of Building Commissioning Professionals. This study was performed by Professional Testing on behalf of the National Renewable Energy Laboratory (NREL). The competency (domains, tasks and associated knowledge) list, which defines the work performed by practitioners, was initially developed by a representative panel of practitioners during a meeting held on February 19?21, 2014 in Orlando Florida. Following the identification of the job tasks and associated knowledge and skills, a validation survey was conducted of the finding of the JTA and the results of the validation study were reviewed by a representative panel of practitioners during a conference call held on June 6, 2014. The committee finalized the JTA and examination blueprints for the Building Commissioning credential scheme based on the survey results.

Woodley, C.; DePascale, C.

2015-01-01T23:59:59.000Z

475

Job Task Analysis: Building Energy Auditor; November 2013 - December 2014  

SciTech Connect (OSTI)

This report describes the process for and results of a comprehensive job task analysis of Energy Auditors. This study was performed by Professional Testing on behalf of the National Renewable Energy Laboratory (NREL). The competency (domains, tasks and associated knowledge) list, which defines the work performed by practitioners, was initially developed by a representative panel of practitioners during a meeting held on February 3?5, 2014 in Orlando Florida. Following the identification of the job tasks and associated knowledge and skills, a validation survey was conducted of the finding of the JTA and the results of the validation study were reviewed by a representative panel of practitioners during a conference call held on May 29, 2014. The committee finalized the JTA and examination blueprints for the Energy Auditor credential scheme based on the survey results.

Woodley, C. D.

2015-01-01T23:59:59.000Z

476

Amerikooler: Order (2013-CE-5307)  

Broader source: Energy.gov [DOE]

DOE ordered Amerikooler, Inc. to pay a $8,000 civil penalty after finding Amerikooler had failed to certify that certain models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

477

Trastar: Order (2013-CE-49003)  

Broader source: Energy.gov [DOE]

DOE ordered Trastar Inc. to pay a $8,000 civil penalty after finding Trastar had failed to certify that certain basic models of traffic signal modules and pedestrian modules comply with the applicable energy conservation standards.

478

Keystone: Order (2013-CE-2601)  

Broader source: Energy.gov [DOE]

DOE ordered Keystone Technologies, LLC to pay a $8,000 civil penalty after finding Keystone had failed to certify that certain models of fluorescent lamp ballasts comply with the applicable energy conservation standards.

479

Trojan: Order (2011-CE-2704)  

Broader source: Energy.gov [DOE]

DOE ordered Trojan, Inc. to pay a $6,000 civil penalty after finding Trojan had failed to certify that certain models of incandescent reflector lamps comply with the applicable energy conservation standards.

480

Dacor: Order (2014-CE-23010)  

Broader source: Energy.gov [DOE]

DOE ordered Dacor to pay a $8,000 civil penalty after finding Dacor had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

Note: This page contains sample records for the topic "task order fiscal" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Northland: Order (2014-CE-23002)  

Broader source: Energy.gov [DOE]

DOE ordered Northland Corporation d/b/a AGA Marvel to pay a $16,000 civil penalty after finding Northland had failed to certify that certain models of cooking products comply with the applicable energy conservation standards.

482

Using Multiple Unmanned Systems for a Site Security Task  

SciTech Connect (OSTI)

Unmanned systems are often used to augment the ability of humans to perform challenging tasks. While the value of individual unmanned vehicles have been proven for a variety of tasks, it is less understood how multiple unmanned systems should be used together to accomplish larger missions such as site security. The purpose of this paper is to discuss efforts by researchers at the Idaho National Laboratory (INL) to explore the utility and practicality of operating multiple unmanned systems for a site security mission. This paper reviews the technology developed for a multi-agent mission and summarizes the lessons-learned from a technology demonstration.

Matthew O. Anderson; Curtis W. Nielsen; Mark D. McKay; Derek C. Wadsworth; Ryan C. Hruska; John A. Koudelka

2009-04-01T23:59:59.000Z

483

USER MANUAL -BIOMEDICAL APPLICATION WP1 -TASK 1.1  

E-Print Network [OSTI]

USER MANUAL - BIOMEDICAL APPLICATION WP1 - TASK 1.1 CG1.1-v1.0-UvA007- Biomedical Filename: CG1.1-v1.0-UvA007- BiomedicalAppUserManual.doc Work package: WP1 ­ Task 1.1 Partner(s): UvA, University Linz Lead Partner: UvA Config ID: CG1.1-v1.0-UvA007-BiomedicalAppUserManual Document

Zudilova-Seinstra, Elena

484

Toward Real-time, Many-Task Applications on Large Distributed Systems  

E-Print Network [OSTI]

time for task management operations, such as task scheduling, state transitioning, and validation. We generation, the transition of task and result states, and scheduling. These management functions can incur-time requirements. One major challenge is the server-side management of these tasks, which often number in tens

Paris-Sud XI, Université de

485

Underground Test Area Fiscal Year 2013 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2013. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2013. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, and publishing documents. In addition, integrated UGTA required reading and corrective action tracking was instituted.

Krenzien, Susan; Marutzky, Sam

2014-01-01T23:59:59.000Z

486

Underground Test Area Fiscal Year 2012 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This report is mandated by the Underground Test Area (UGTA) Quality Assurance Project Plan (QAPP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2012. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2012. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, revising the QAPP, and publishing documents. In addition, processes and procedures were developed to address deficiencies identified in the FY 2011 QAPP gap analysis.

Farnham, Irene; Marutzky, Sam

2013-01-01T23:59:59.000Z

487

The potential role of a carbon tax in U.S. fiscal reform  

SciTech Connect (OSTI)

This paper examines fiscal reform options in the United States with an intertemporal computable general equilibrium model of the world economy called G-Cubed. Six policy scenarios explore two overarching issues: (1) the effects of a carbon tax under alternative assumptions about the use of the resulting revenue, and (2) the effects of alternative measures that could be used to reduce the budget deficit. We examine a simple excise tax on the carbon content of fossil fuels in the U.S. energy sector starting immediately at $15 per metric ton of carbon dioxide (CO2) and rising at 4 percent above inflation each year through 2050. We investigate policies that allow the revenue from the illustrative carbon tax to reduce the long run federal budget deficit or the marginal tax rates on labor and capital income. We also compare the carbon tax to other means of reducing the deficit by the same amount. We find that the carbon tax will raise considerable revenue: $80 billion at the outset, rising to $170 billion in 2030 and $310 billion by 2050. It also significantly reduces U.S. CO2 emissions by an amount that is largely independent of the use of the revenue. By 2050, annual CO2 emissions fall by 2.5 billion metric tons (BMT), or 34 percent, relative to baseline, and cumulative emissions fall by 40 BMT through 2050. The use of the revenue affects both broad economic impacts and the composition of GDP across consumption, investment and net exports. In most scenarios, the carbon tax lowers GDP slightly, reduces investment and exports, and increases imports. The effect on consumption varies across policies and can be positive if households receive the revenue as a lump sum transfer. Using the revenue for a capital tax cut, however, is significantly different than the other policies. In that case, investment booms, employment rises, consumption declines slightly, imports increase, and overall GDP rises significantly relative to baseline through about 2040. Thus, a tax reform that uses a carbon tax to reduce capital taxes would achieve two goals: reducing CO2 emissions significantly and expanding short-run employment and the economy. We examine three ways to reduce the deficit by an equal amount. We find that raising marginal tax rates on labor income has advantages over raising tax rates on capital income or establishing a carbon tax. A labor tax increase leaves GDP close to its baseline, reduces consumption very slightly and expands net exports slightly. Investment remains essentially unchanged. In contrast, a capital tax increase causes a significant and persistent drop in investment and much larger reductions in GDP. A carbon tax falls between the two: it lowers GDP more than a labor tax increase because it reduces investment. However, its effects on investment and GDP are more moderate than the capital tax increase, and it also significantly reduces CO2 emissions. A carbon tax thus offers a way to help reduce the deficit and improve the environment, and do so with minimal disturbance to overall economic activity.

McKibbin, Warwick [Australian National Univ. (Australia); The Brookings Institution, Washington, DC (United States); Morris, Adele [The Brookings Institution, Washington, DC (United States); Wilcoxen, Peter [Syracuse University, NY (United States); The Brookings Institution, Washington, DC (United States); Cai, Yiyong [Commonwealth Scientific and Industrial Research Organization, Australian National Univ. (Australia)

2012-07-24T23:59:59.000Z

488

Advanced Test Reactor Core Modeling Update Project Annual Report for Fiscal Year 2011  

SciTech Connect (OSTI)

Legacy computational reactor physics software tools and protocols currently used for support of Advanced Test Reactor (ATR) core fuel management and safety assurance and, to some extent, experiment management are obsolete, inconsistent with the state of modern nuclear engineering practice, and are becoming increasingly difficult to properly verify and validate (V&V). Furthermore, the legacy staff knowledge required for application of these tools and protocols from the 1960s and 1970s is rapidly being lost due to staff turnover and retirements. In 2009 the Idaho National Laboratory (INL) initiated a focused effort to address this situation through the introduction of modern high-fidelity computational software and protocols, with appropriate V&V, within the next 3-4 years via the ATR Core Modeling and Simulation and V&V Update (or 'Core Modeling Update') Project. This aggressive computational and experimental campaign will have a broad strategic impact on the operation of the ATR, both in terms of improved computational efficiency and accuracy for support of ongoing DOE programs as well as in terms of national and international recognition of the ATR National Scientific User Facility (NSUF). The ATR Core Modeling Update Project, targeted for full implementation in phase with the anticipated ATR Core Internals Changeout (CIC) in the 2014 time frame, began during the last quarter of Fiscal Year 2009, and has just completed its first full year. Key accomplishments so far have encompassed both computational as well as experimental work. A new suite of stochastic and deterministic transport theory based reactor physics codes and their supporting nuclear data libraries (SCALE, KENO-6, HELIOS, NEWT, and ATTILA) have been installed at the INL under various permanent sitewide license agreements and corresponding baseline models of the ATR and ATRC are now operational, demonstrating the basic feasibility of these code packages for their intended purpose. Furthermore, a capability for rigorous sensitivity analysis and uncertainty quantification based on the TSUNAMI system is being implemented and initial computational results have been obtained. This capability will have many applications in 2011 and beyond as a tool for understanding the margins of uncertainty in the new models as well as for validation experiment design and interpretation. Finally we note that although full implementation of the new computational models and protocols will extend over a period 3-4 years as noted above, interim applications in the much nearer term have already been demonstrated. In particular, these demonstrations included an analysis that was useful for understanding the cause of some issues in December 2009 that were triggered by a larger than acceptable discrepancy between the measured excess core reactivity and a calculated value that was based on the legacy computational methods. As the Modeling Update project proceeds we anticipate further such interim, informal, applications in parallel with formal qualification of the system under the applicable INL Quality Assurance procedures and standards.

David W. Nigg; Devin A. Steuhm

2011-09-01T23:59:59.000Z

489

Environment, Safety, and Health Self-Assessment Report, Fiscal Year 2008  

SciTech Connect (OSTI)

Lawrence Berkeley National Laboratory's Environment, Safety, and Health (ES&H) Self-Assessment Program ensures that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The Self-Assessment Program, managed by the Office of Contract Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The functions of the program are to ensure that work is conducted safely, and with minimal negative impact to workers, the public, and the environment. The Self-Assessment Program is also the mechanism used to institute continuous improvements to the Laboratory's ES&H programs. The program is described in LBNL/PUB 5344, Environment, Safety, and Health Self-Assessment Program and is composed of four distinct assessments: the Division Self-Assessment, the Management of Environment, Safety, and Health (MESH) review, ES&H Technical Assurance, and the Appendix B Self-Assessment. The Division Self-Assessment uses the five core functions and seven guiding principles of ISM as the basis of evaluation. Metrics are created to measure performance in fulfilling ISM core functions and guiding principles, as well as promoting compliance with applicable regulations. The five core functions of ISM are as follows: (1) Define the Scope of Work; (2) Identify and Analyze Hazards; (3) Control the Hazards; (4) Perform the Work; and (5) Feedback and Improvement. The seven guiding principles of ISM are as follows: (1) Line Management Responsibility for ES&H; (2) Clear Roles and Responsibilities; (3) Competence Commensurate with Responsibilities; (4) Balanced Priorities; (5) Identification of ES&H Standards and Requirements; (6) Hazard Controls Tailored to the Work Performed; and (7) Operations Authorization. Performance indicators are developed by consensus with OCA, representatives from each division, and Environment, Health, and Safety (EH&S) Division program managers. Line management of each division performs the Division Self-Assessment annually. The primary focus of the review is workplace safety. The MESH review is an evaluation of division management of ES&H in its research and operations, focusing on implementation and effectiveness of the division's ISM plan. It is a peer review performed by members of the LBNL Safety Review Committee (SRC), with staff support from OCA. Each division receives a MESH review every two to four years, depending on the results of the previous review. The ES&H Technical Assurance Program (TAP) provides the framework for systematic reviews of ES&H programs and processes. The intent of ES&H Technical Assurance assessments is to provide assurance that ES&H programs and processes comply with their guiding regulations, are effective, and are properly implemented by LBNL divisions. The Appendix B Performance Evaluation and Measurement Plan (PEMP) requires that LBNL sustain and enhance the effectiveness of integrated safety, health, and environmental protection through a strong and well-deployed system. Information required for Appendix B is provided by EH&S Division functional managers. The annual Appendix B report is submitted at the close of the fiscal year. This assessment is the Department of Energy's (DOE) primary mechanism for evaluating LBNL's contract performance in ISM.

Chernowski, John

2009-02-27T23:59:59.000Z

490

Operator Choice Modeling for Collaborative UAV Visual Search Tasks  

E-Print Network [OSTI]

Operator Choice Modeling for Collaborative UAV Visual Search Tasks Luca F. Bertuccelli Member, IEEE, and Mary L. Cummings Senior Member, IEEE Abstract--Unmanned Aerial Vehicles (UAVs) provide unprece- dented is expected to increase with envisaged future missions of one operator controlling mul- tiple UAVs

Cummings, Mary "Missy"

491

BIOMECHANICS OF MOVEMENT-RELATED EFFORT: EFFECTS OF TASK  

E-Print Network [OSTI]

by the humero-ulnar and humero-radial joints allowing flexion and extension. In-phase: synchronized upper limb movements. Non-dominant: non-preferred limb to perform fine and gross motor tasks. Peak torque: single highest torque (rotational torsion about...

Bond, Bryan M.

2012-08-31T23:59:59.000Z

492

Enabling Task Level Parallelism in HandelC  

E-Print Network [OSTI]

HandelC is a programming language used to target hardware and is similar in syntax to ANSI-C. HandelC offers constructs that allow programmers to express instruction level parallelism. Also, HandelC offers primitives that allow task level...

AbuYasin, Thamer S.

2007-12-14T23:59:59.000Z

493

Sequence Learning Through PIPE and Automatic Task Decomposition  

E-Print Network [OSTI]

Sequence Learning Through PIPE and Automatic Task Decomposition Rafal P. Salustowicz and Jurgen by long time lags: we show that discrete Probabilistic Incremental Program Evolu- tion" PIPE can solve Memory" | LSTM. In fact, some- times PIPE even outperforms LSTM. Exist- ing discrete methods, however

Fernandez, Thomas

494

A Multi Faceted Recommendation Approach for Explorative Video Retrieval Tasks  

E-Print Network [OSTI]

(D). The users enter a text based query in the search panel to begin their search. The result panel's task. Author Keywords: Video, collaborative, recommendation, exploratory, search. ACM Classification Keywords: H.5.1 Multimedia Infor- mation Systems, H.5.3 Group and Organization Interfaces General Terms

495

Urban Consortium Energy Task Force - Year 21 Final Report  

SciTech Connect (OSTI)

The Urban Consortium Energy Task Force (UCETF), comprised of representatives of large cities and counties in the United States, is a subgroup of the Urban Consortium, an organization of the nation's largest cities and counties joined together to identify, develop and deploy innovative approaches and technological solutions to pressing urban issues.

NONE

2003-04-01T23:59:59.000Z

496

Communication tasks with infinite quantum-classical separation  

E-Print Network [OSTI]

Quantum resources can be more powerful than classical resources - a quantum computer can solve certain problems exponentially faster than a classical computer, and computing a function of two people's inputs can be done with exponentially less communication with quantum messages than with classical ones. Here we consider a task between two players, Alice and Bob where quantum resources are infinitely more powerful than classical ones. Alice is given a string of length n, and Bob's task is to exclude certain combinations of bits that Alice might have. If Alice must send classical messages, then she must reveal nearly n bits of information to Bob, but if she is allowed to send quantum bits, the amount of information she must reveal goes to zero with increasing n. Next, we consider a version of the task where the parties can only send classical messages but may have access to entanglement. When assisted by entanglement, Alice only needs to send a constant number of bits, while without entanglement, the number of bits Alice must send grows linearly with n. The task is related to the PBR theorem which arises in the context of the foundations of quantum theory.

Christopher Perry; Rahul Jain; Jonathan Oppenheim

2015-03-03T23:59:59.000Z

497

Cooperative Task Assignment of Unmanned Aerial Vehicles in Adversarial Environments  

E-Print Network [OSTI]

stochastic formulation of the UAV task assignment problem. This formulation ex- plicitly accounts to maximize the mission value as an expectation, this stochastic formulation designs coordinated plans are not constant and change with time due to the removal of SAM sites by other UAVs. This allocation recovers

How, Jonathan P.

498

Auction Equilibrium Strategies for Task Allocation in Uncertain Environments  

E-Print Network [OSTI]

concerning coopera- tive agents aiming for a joint goal are not applicable in such environ- ments, since self, a company, etc., operating in a dynamic environment and lacking the required re- sources to performAuction Equilibrium Strategies for Task Allocation in Uncertain Environments David Sarne1 , Meirav

Kraus, Sarit

499

Power-Aware Dynamic Task Scheduling for Heterogeneous Accelerated Clusters  

E-Print Network [OSTI]

Power-Aware Dynamic Task Scheduling for Heterogeneous Accelerated Clusters Tomoaki Hamano, Toshio Endo and Satoshi Matsuoka Tokyo Institute of Technology/JST, Japan Abstract Recent accelerators with accelerators and general CPUs are becoming popular, such as LANL's Roadrun- ner and our own TSUBAME

500

Delay analysis of bursty tasks using workload arrival functions  

E-Print Network [OSTI]

and the integrated methodologies with variable workloads are introduced. However, these methodologies have some limitations when they are applied to task systems instead of traffic. In this thesis, we propose that the end-to-end delay computed by the decomposed...

Kim, Junwhan