National Library of Energy BETA

Sample records for task order fiscal

  1. Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report | Department of Energy 8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report (359.12 KB) More Documents & Publications Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 201

  2. Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report | Department of Energy 9 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report (242.82 KB) More Documents & Publications Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 200

  3. Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report | Department of Energy 0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report (704.34 KB) More Documents & Publications Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011

  4. Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report | Department of Energy 1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report (599.86 KB) More Documents & Publications Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008

  5. TASK ORDER

    National Nuclear Security Administration (NNSA)

    NA0000XXX Task Order No: DE-DT000XXXX Statement of Work August 7, 2015 Task Order Title: Design, Integration, Construction, Communications, and Engineering (DICCE) Services for Port of Cat Lai, Vietnam. Scope: The Contractor shall design, construct, and integrate fully functional portal monitor and communications systems at designated sites in Vietnam. * Port of Cat Lai Requirements Documents: The following task order requirements describe key milestones and deliverables. For a more complete

  6. ESPC ENABLE Draft Task Order

    Broader source: Energy.gov [DOE]

    Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project.

  7. Competition Advocates and Task-Order and Delivery Order Ombudsman |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Acquisition Management Competition Advocates and Task-Order and Delivery Order Ombudsman There are two senior agency positions dedicated to ensuring full and open competition as a part of the federal contracting process: Competition Advocates and Task-Order and Delivery Order Ombudsman. Competition Advocates are responsible for: Promoting full and open competition; Promoting the acquisition of commercial items; Removing barriers to full and

  8. Task Order Awarded for Environmental Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for environmental technical services to Professional Project Services, Inc., of Oak Ridge, TN, for support services at the Paducah Gaseous Diffusion Plant located near Paducah, KY.

  9. Task Order Price Evaluation Worksheet for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Order Price Evaluation Worksheet for ESPCs Task Order Price Evaluation Worksheet for ESPCs Document lists a series of site-specific proposal data questions to answer for a task order. Download the Task Order Price Evaluation Worksheet. (73 KB) More Documents & Publications Task Order Price Evaluation Worksheet for Super ESPC Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) ESPC Task Order Financial Schedules (IDIQ Attachment J-6)

  10. Descriptions of ESPC Task Order Schedules and Placement of Pricing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pricing Information (IDIQ Attachment J-5) Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5) Document provides task order ...

  11. Task Order Awarded for Moab Uranium Mill Tailings Remedial Action...

    Office of Environmental Management (EM)

    Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On ...

  12. DOE Awards Research and Systems Engineering Task Order | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research and Systems Engineering Task Order DOE Awards Research and Systems Engineering Task Order March 28, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 ...

  13. Hanford Waste Treatment Plant Support Task Order Modified | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Waste Treatment Plant Support Task Order Modified Hanford Waste Treatment Plant Support Task Order Modified March 11, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a modification to a task order to Aspen Resources Limited, Inc. of Boulder, Colorado for support of the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site. The modification increased the value of the

  14. Energy Department Awards First Major Task Order Under Streamlined

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracting System | Department of Energy First Major Task Order Under Streamlined Contracting System Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up WASHINGTON, DC - The Department of Energy (DOE) has awarded a Task Order for an estimated $19.4 million to LATA-SHARP Remediation Services, LLC for the completion of clean-up activities at the Ashtabula Closure Project (ACP)

  15. Task Order Price Evaluation Worksheet for SUPER ESPC

    Broader source: Energy.gov [DOE]

    Document provides a worksheet for evaluating price for a task order as part of a Super Energy Savings Performance Contract (ESPC).

  16. DOE Awards Research and Systems Engineering Task Order | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Research and Systems Engineering Task Order DOE Awards Research and Systems Engineering Task Order April 28, 2016 - 2:00pm Addthis Media Contact: Lynette Chafin (513) 246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today awarded a task order to the MITRE Corporation, of McLean Virginia. MITRE will provide research and development in support of DOE's Office of Environmental Management. The task order has an approximate value of $1.176 million,

  17. Energy Department Awards First Major Task Order Under Streamlined...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Awards First Major Task Order Under Streamlined Contracting System October 17, 2005 - 11:59am Addthis New Mexico Firm Contracted for Ashtabula Clean-up ...

  18. DOE Awards Task Order for Lexington Project Office Audit

    Broader source: Energy.gov [DOE]

    Cincinnati - The U.S. Department of Energy (DOE) Office of Environmental Management today awarded a task order to KPMG LLP, of McLean, Virginia to perform audit services for the Portsmouth/Paducah Project Office in Lexington, Kentucky. The task order has an approximate value of $2.9 million over a two-year performance period.

  19. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10:00am Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Firm-Fixed Unit Rate Task Order to Sage Energy Trading of Jenks, OK. Sage Energy Trading is a Woman Owned Small Business. The Task Order will have a maximum value of $3.5 million over 2 years. Work performed under this Task Order will be performed at the Portsmouth Gaseous Diffusion Plant in Piketon, OH. The contractor will be

  20. DOE Awards Small Business Task Order | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Time and Materials Task Order to Industrial Economics, Incorporated, located in Cambridge, MA. Industrial Economics, Incorporated is a Small Business. The Task Order will have a maximum value of $1.77 million over 3 years. Work performed under this Task Order will be performed at the Los Alamos National Laboratory in Los Alamos, NM.

  1. Task Order Awarded for Audit and Review Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services.

  2. DOE Awards Task Order Modification for Support Services to Office...

    Office of Environmental Management (EM)

    Cincinnati - The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and ...

  3. Task Order Awarded for Technical Support Services | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 26, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 ... Services to be performed under the task order include: D&D strategic planning; D&D mission ...

  4. UniTech Task Order Modifications - DT0010421 - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    UniTech Task Order Modifications - DT0010421 DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives UniTech Task Order Modifications - DT0010421 Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 0006 The purpose of this modification is to provide $334,072.91 of incremental funding for the base period, for line item 0002 WRPS Laundry

  5. Task Order Awarded for Audit and Review Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy today awarded a Task Order to KPMG, LLP of McLean, VA for audit/review services that will cover a wide range of auditing services. These services will include: pricing proposals, requests for equitable adjustment, change order proposals, business systems (accounting, purchasing and billing systems), forward pricing rates, incurred costs audits, and terminations. Individual subtask orders will be placed for each specific assignment as needed from October 1, 2012 through September 30, 2013. The total not-toexceed value of the task order is $2,993,733.00.

  6. DOE Awards Task Order for Litigation Support Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today announced the award of a task order to TLI Solutions, Inc., a large business, from Arvada, CO for Litigation Support Services to support the Environmental Management Consolidated Business Center (EMCBC) Office of Chief Counsel (OCC).

  7. Attachment J-16 Portfolio Management Task Order 14-001

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mod 323 Attachment J-16 Portfolio Management Task Order 14-001 Statement of Work - 1 - Title: AMRP PBS 41 - Project Management / Project Controls Support Revision Number: 0 Date: September 17, 2013 Start: October 1, 2013 Finish: September 30, 2014 1.0 DESCRIPTION Mission Support Alliance (MSA) Portfolio Management (PFM) will provide the following project management/project controls support services as described below. The services will be performed in accordance with Contract DE-AC06-09RL14728,

  8. DOE ESPC TASK ORDER REQUEST FOR PROPOSAL (TO RFP) TEMPLATE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE ESPC TASK ORDER REQUEST FOR PROPOSAL (TO RFP) TEMPLATE INSTRUCTIONS FOR USING THE TEMPLATE The TO RFP is used to communicate agency- or site-specific terms and conditions for the project to the ESCO. The DOE IDIQ contract permits such revision, per section C.1.3: C.1.3 Unless otherwise stated, all provisions that follow throughout the remaining sections of this master IDIQ contract may be revised within the overall scope of the contract, as necessary (based on the needs and regulations of

  9. Descriptions of ESPC Task Order Schedules and Placement of Pricing Information (IDIQ Attachment J-5)

    Broader source: Energy.gov [DOE]

    Document provides task order schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs).

  10. DOE Awards Small Business Task Order for Technical Support to the Office of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management | Department of Energy Task Order for Technical Support to the Office of Environmental Management DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management June 27, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to TerranearPMC, LLC of Exton, Pennsylvania for support services

  11. DOE Awards Task Order to Northern New Mexico Small Business to Develop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documented Safety Analysis and Technical Safety Requirements Procedures | Department of Energy DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures May 16, 2016 - 9:00am Addthis DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented

  12. Contract DE-EM0003878 Task Order DE-DT0011253 Sigma Science, Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    /16/2016 Contract DE-EM0003878 Task Order DE-DT0011253 Sigma Science, Inc. Page 3 of 17 SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS Section B of the ID/IQ basic contract is incorporated by reference with the exception of clauses applicable to Fixed-Price task orders only, and revised Clauses B.01, B.02, and B.04 as shown below. B.01 TYPE OF TASK ORDER AND SERVICES BEING ACQUIRED This is a Time-and-Materials (T&M) task order in accordance with the terms and conditions set forth in the

  13. Task Order Awarded to Small Business for Natural Gas Services | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Task Order Awarded to Small Business for Natural Gas Services Task Order Awarded to Small Business for Natural Gas Services December 30, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a task order to Sage Energy Trading LLC, of Jenks, Oklahoma for natural gas services. A firm fixed unit rate task order will be issued from the General Services Administration (GSA) Schedule with

  14. DOE Awards Task Order to Northern New Mexico Small Business to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures DOE Awards Task Order to Northern New Mexico Small Business to Develop ...

  15. Task Order Awarded to Small Business for Natural Gas Services | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy to Small Business for Natural Gas Services Task Order Awarded to Small Business for Natural Gas Services December 30, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today awarded a task order to Pike Natural Gas, located in Hillsboro, Ohio for natural gas services. A firm fixed unit rate task order will be awarded with a not to exceed amount of $5.250 million value and a 10 year period of

  16. DOE Awards Task Order for Disposal of Los Alamos National Lab Waste |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Task Order for Disposal of Los Alamos National Lab Waste DOE Awards Task Order for Disposal of Los Alamos National Lab Waste November 13, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed

  17. TASK ORDER

    National Nuclear Security Administration (NNSA)

    ... Page 4 of 6 U.S. DEPARTMENT OF ENERGY NATIONAL NUCLEAR SECURITY ... flash cards, or other media storage devices necessary for system operation shall also be provided; ...

  18. DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to Boston Government Services, LLC of Lenoir City, Tennessee for support services to the DOE Office of Environmental Management.

  19. DOE Awards Task Order Modification for Support Services to Office of Environmental Management

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and program analytical support for the Office of Environmental Management.

  20. EM Employee Serves Military in Afghanistan, Manages $5.8 Billion Army Task Order

    Office of Energy Efficiency and Renewable Energy (EERE)

    BAGRAM AIRFIELD, Afghanistan – EM employee James Hawkins is currently serving the U.S. military in Afghanistan, where he is administering a $5.8 billion task order for the Army.

  1. Placing UESC Task Orders Under the GSA Areawide Contract | Department of

    Office of Environmental Management (EM)

    Energy Placing UESC Task Orders Under the GSA Areawide Contract Placing UESC Task Orders Under the GSA Areawide Contract March 17, 2016 11:00AM to 1:00PM EDT Webinar provides attendees with an overview of the contracting options and services available from their local utility companies to engineer, finance, and install cost effective energy- and water-savings projects. Participants will be walked through the typical project process, from the audit phase to commissioning the equipment.

  2. DOE ESPC Task Order Request for Proposal (TO-RFP) Template | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy ESPC Task Order Request for Proposal (TO-RFP) Template DOE ESPC Task Order Request for Proposal (TO-RFP) Template Template federal agencies may use for communicating specific terms and conditions to an energy services company regarding a U.S. Department of Energy energy savings performance contract (ESPC) project. Download the TO-RFP Template. (277.5 KB) More Documents & Publications Guide to Government Witnessing and Review of Measurement and Verification Activities Guidelines,

  3. DOE Awards Small Business Task Order for Technical Support to the Office of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Management | Department of Energy Order for Technical Support to the Office of Environmental Management DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management July 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to TerranearPMC, LLC of Exton, PA to provide Spent Nuclear Fuel and Excess Nuclear

  4. DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract. The award is a firm, fixed-price task order, based on pre-established rates with a $1.29 million value and has a one-year performance period.

  5. Small Business TerranearPMC Awarded $2 Million Task Order | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy TerranearPMC Awarded $2 Million Task Order Small Business TerranearPMC Awarded $2 Million Task Order July 5, 2013 - 10:45am Addthis TerranearPMC at work on anomaly sampling in the 300 Area of Hanford. TerranearPMC at work on anomaly sampling in the 300 Area of Hanford. TerranearPMC is no stranger to working with the government. These graduates of the Department's Mentor Protégé Program founded their company with eye towards working in federal marketplace, with employees who had

  6. Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Follow-On Effort | Department of Energy for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort Task Order Awarded for Moab Uranium Mill Tailings Remedial Action (UMTRA) Follow-On Effort April 20, 2016 - 11:30am Addthis Media Contact: Lynette Chafin 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award of a Fixed Unit Rate and Cost Reimbursement Task Order issued under the Office of Environmental Management Nationwide

  7. DOE Awards Task Order for Disposal of Los Alamos National Laboratory Waste

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract.

  8. DOE Awards Task Order for Disposal of Los Alamos National Lab Waste

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) today awarded a task order in support of the Los Alamos National Laboratory Legacy Waste Project to Waste Control Specialists (WCS) of Andrews, Texas under the Environmental Management (EM) Low-Level and Mixed Low-Level Waste Disposal Indefinite Delivery/Indefinite Quantity (ID/IQ) Master Contract.

  9. CONTRACTNO.: DE-X13-96GJ87335 TASK ORDER NO.: h

    Office of Legacy Management (LM)

    March 13,2001 CONTRACTNO.: DE-X13-96GJ87335 TASK ORDER NO.: h l K O I - 0 6 CONTROLNO.: 3100-T01-0440 Project Manager Department of Energy Grand Junction Office 2597 B314 Road ...

  10. Practical Guide to Savings and Payments in FEMP ESPC Task Orders

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Leading by example, saving energy and taxpayer dollars in federal facilities Practical Guide to Savings and Payments in FEMP ESPC Task Orders Rev. 3 January 2009 Contents Preface ........................................................................................................................................ 1. Purpose and Scope of the Practical Guide.............................................................. 1 2. Legislation and Rules

  11. DOE Awards Task Order to Northern New Mexico Small Business to Develop

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Documented Safety Analysis and Technical Safety Requirements Procedures | Department of Energy to Northern New Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures DOE Awards Task Order to Northern New Mexico Small Business to Develop Documented Safety Analysis and Technical Safety Requirements Procedures May 16, 2016 - 2:00am Addthis Media Contact: Lynette Chafin 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department

  12. Attachment J-16 Portfolio Management Task Order 13-003 Revision 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-16 Portfolio Management Task Order 13-003 Revision 1 Title: DOE-RL AMB HGET Training Approval Process SIA Date: August 6, 2013 Start: August 6, 2013 Finish: November 30, 2013 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide subject matter experts to provide facilitation and project management support for an Operating Excellence (OE) Structured Improvement Activity (SIA) for the Department of Energy Richland (DOE-RL) Assistant Manager for Business and Financial Operations (AMB)

  13. FEMP Best Practices and Lessons Learned for Federal Agency ESPC Projects: Task Order Request for Proposal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . TASK ORDER REQUEST FOR PROPOSAL (TO-RFP) The TO incorporates the TO-RFP, the ESCO's IGA/proposal, and the IDIQ (the DOE indefinite- delivery, indefinite-quantity contract) - so the agency needs to know what all of them say. The purpose of the TO-RFP is to incorporate site-specific requirements into the TO by modifying, adding to, or deleting IDIQ contract terms, as long as these changes are within the overall scope of the IDIQ. 6.1 Use the FEMP TO-RFP Template, which lists all the DOE IDIQ

  14. Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report

    SciTech Connect (OSTI)

    Geerlofs, Simon H.; Hanna, Luke A.; Judd, Chaeli R.; Blake, Kara M.

    2012-09-01

    This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry. Objectives for 2.1.7 are the following: • To work with stakeholders to streamline the MHK regulatory permitting process. • To work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development. • To communicate research findings and directions to the MHK industry and stakeholders. • To engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which are described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning As the MHK industry works with the regulatory community and stakeholders to plan, site, permit and license MHK technologies they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under 2.1.7 is to understand these varied interests, explore mechanisms to reduce conflict, identify efficiencies, and ultimately identify pathways to reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

  15. Task Cover

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SOLICITATION NO. DE-SOL-0003641 Exhibit G The following item(s) are contained in this file: ITEM NAME NO. OF PAGES(S) Sample Task Order 1 Site Support Services 14 Sample Task Order 2 Health Program Services 16 Sample Task Order 3 Janitorial Services (including Child 30 Care Center Cleaning Standards) Task Order Transition 4 DE-SOL-0003641 Sample Task Order 1 (including Exhibit I) SAMPLE TASK ORDER 1 SITE OPERATIONS SUPPORT TASK ORDER REQUEST INFORMATION: a) Task Order Period of Performance -

  16. Summary report for subcontract No. 0412J0004-3Y, task order 23. Final report

    SciTech Connect (OSTI)

    1997-10-02

    This task covers work performed by Carlton S. Young for various projects in Group P-22, Los Alamos National Lab from September 1996 to September 22, 1997. Projects worked on and charged to contract: (1) rebound, 80%; (2) reports on Nevada events Divider and Victoria, 10%; (3) FORTRAN modifications to a Macintosh version of the ACCEPT code and calculations on GAAs PCDs and Cherenkov detectors, 0%; (4) design of time and space-resolved burn measurements for the National Ignition Facility (NIF) based on a gas Cherenkov gamma-ray detector and proposals for more money to do the same, 10%. A summary of work on each project is included.

  17. Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 Department of Energy Report and Agency ...

  18. Attachment J-16 Portfolio Management Task Order 13-002 Title: DOE-HQ Security System Review and Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Contract No. DE-AC06-09RL14728 Modification 280 Attachment J-16 Portfolio Management Task Order 13-002 Title: DOE-HQ Security System Review and Assessment Revision Number: 0 Date: 04/11/2013 Start: 05/01/2013 Finish: 07/30/2013 1.0 DESCRIPTION The DOE Office of Environmental Management (EM) Headquarters Security System (HQSS) is installed at the EM Consolidated Business Center (CBC) in Cincinnati, OH and administered from DOE Headquarters in Washington, DC. HQSS has been running as a

  19. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Management Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order PDF icon WM-FY12-WP...

  20. Environmental Monitoring, Remediation, and Surveillance Committee Fiscal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Year 2012 Work Plan | Department of Energy Monitoring, Remediation, and Surveillance Committee Fiscal Year 2012 Work Plan Environmental Monitoring, Remediation, and Surveillance Committee Fiscal Year 2012 Work Plan Topics: Groundwater Surface water Consent Order EMSR-FY12-WP - September 1, 2011 (128.63

  1. Effects of Electromagnetic Fields on Fish and Invertebrates: Task 2.1.3: Effects on Aquatic Organisms - Fiscal Year 2011 Progress Report - Environmental Effects of Marine and Hydrokinetic Energy

    SciTech Connect (OSTI)

    Woodruff, Dana L.; Schultz, Irvin R.; Marshall, Kathryn E.; Ward, Jeffrey A.; Cullinan, Valerie I.

    2012-05-01

    This fiscal year (FY) 2011 progress report (Task 2.1.3 Effects on Aquatic Organisms, Subtask 2.3.1.1 Electromagnetic Fields) describes studies conducted by PNNL as part of the DOE Wind and Water Power Program to examine the potential effects of electromagnetic fields (EMF) from marine and hydrokinetic devices on aquatic organisms, including freshwater and marine fish and marine invertebrates. In this report, we provide a description of the methods and results of experiments conducted in FY 2010-FY 2011 to evaluate potential responses of selected aquatic organisms. Preliminary EMF laboratory experiments during FY 2010 and 2011 entailed exposures with representative fish and invertebrate species including juvenile coho salmon (Oncorhynchus kisutch), Atlantic halibut (Hippoglossus hippoglossus), California halibut (Paralicthys californicus), rainbow trout (Oncorhynchus mykiss), and Dungeness crab (Metacarcinus magister). These species were selected for their ecological, commercial, and/or recreational importance, as well as their potential to encounter an MHK device or transmission cable during part or all of their life cycle. Based on previous studies, acute effects such as mortality were not expected to occur from EMF exposures. Therefore, our measurement endpoints focused on behavioral responses (e.g., detection of EMF, interference with feeding behavior, avoidance or attraction to EMF), developmental changes (i.e., growth and survival from egg or larval stage to juvenile), and exposure markers indicative of physiological responses to stress. EMF intensities during the various tests ranged from 0.1 to 3 millitesla, representing a range of upper bounding conditions reported in the literature. Experiments to date have shown there is little evidence to indicate distinct or extreme behavioral responses in the presence of elevated EMF for the species tested. Several developmental and physiological responses were observed in the fish exposures, although most were not

  2. ORDER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP&L EnergyPlus Company Order No. EA-210 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C. §824a(e)). On May 4, 1999, PP&L EnergyPlus Company (PP&L EnergyPlus) applied to the Office of Fossil Energy (FE) of the Department of Energy (DOE) for authorization to transmit electric energy to Canada as a power marketer. PP&L EnergyPlus, a limited

  3. FY 2006 Executive Order 13101 Report: Department of Energy Affirmative Procurement and Recycling Fiscal Year 2006 Report, 3/12/07

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is pleased to transmit the enclosed report in fulfillment of the annual reporting requirements under Executive Order 13101, Greening the Government through Waste...

  4. Fiscal Year Ended

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year Ended September 30, 2014 Report to Congress July 2016 United States Department of Energy Washington, DC 20585 Department of Energy | July 2016 Report on Uncosted Balances for Fiscal Year Ended 2014| Page iii Executive Summary As required by the Energy Policy Act of 1992 (Public Law 102-486), the Department of Energy is submitting a Report on Uncosted Balances for Fiscal Year Ended 2014. This report presents the results of the Department's annual analysis of uncosted obligation

  5. Consent Order Update

    Broader source: Energy.gov [DOE]

    At the September 24, 2014 Board meeting Pete Maggiore DOE, Provided Information on the Consent Order Work that Needs to be Completed. Information on the Fiscal Year Work Plan was also Provided.

  6. Richland Operations Office's Fiscal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (fiscal year 2014) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 9,815,000 Award Fee Earned: 9,659,555 Award Fee Area Adjectival ...

  7. Effects of Electromagnetic Fields on Fish and Invertebrates Task 2.1.3: Effects on Aquatic Organisms Fiscal Year 2012 Progress Report Environmental Effects of Marine and Hydrokinetic Energy

    SciTech Connect (OSTI)

    Woodruff, Dana L.; Cullinan, Valerie I.; Copping, Andrea E.; Marshall, Kathryn E.

    2013-05-20

    Energy generated by the world’s oceans and rivers offers the potential to make substantial contributions to the domestic and global renewable energy supply. However, the marine and hydrokinetic (MHK) energy industry faces challenges related to siting, permitting, construction, and operation of pilotand commercial-scale facilities. One of the challenges is to understand the potential effects to marine organisms from electromagnetic fields, which are produced as a by-product of transmitting power from offshore to onshore locations through underwater transmission cables. This report documents the progress of the third year of research (fiscal year 2012) to investigate environmental issues associated with marine and hydrokinetic energy (MHK) generation. This work was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) Wind and Water Technologies Office. The report addresses the effects of electromagnetic fields (EMFs) on selected marine species where significant knowledge gaps exist. The species studied this fiscal year included one fish and two crustacean species: the Atlantic halibut (Hippoglossus hippoglossus), Dungeness crab (Metacarcinus magister), and American lobster (Homarus americanus).

  8. Work Scope for Developing Standards for Emergency Preparedness and Response: Fiscal Year 2004 Final Report

    SciTech Connect (OSTI)

    Stenner, Robert D.

    2005-09-28

    Summarizes the fiscal year 2004 work completed on PNNL's Department of Homeland Security Emergency Preparedness and Response Standards Development Project. Also, the report includes key draft standards, in various stages of development and publication, that were associated with various tasks of the fiscal year 2004 scope of the project.

  9. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work Plan Topics: ... More Documents & Publications Environmental Monitoring and Remediation Committee Fiscal ...

  10. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work Plan Topics: ... More Documents & Publications Environmental Monitoring and Remediation Committee Fiscal ...

  11. Hanford Cultural Resources Laboratory annual report for fiscal year 1989

    SciTech Connect (OSTI)

    Chatters, J.C.; Cadoret, N.A.; Minthorn, P.E.

    1990-06-01

    This report summarizes activities of the Hanford Cultural Resources Laboratory (HCRL) during fiscal year 1989. The HCRL provides support for managing the archaeological, historical, and cultural resources of the Hanford Site, Washington, in a manner consistent with the National Historic Preservation Act of 1966, the Archaeological Resources Protection Act of 1979, and the American Indian Religious Freedom Act of 1978. A major task in FY 1989 was completion and publication of the Hanford Cultural Resources Management Plan, which prioritizes tasks to be undertaken to bring the US Department of Energy -- Richland Operations into compliance with federal statutes, relations, and guidelines. During FY 1989, six tasks were performed. In order of priority, these were conducting 107 cultural resource reviews, monitoring the condition of 40 known prehistoric archaeological sites, assessing the condition of artifact collections from the Hanford Site, evaluating three sites and nominating two of those to the National Register of Historic Places, developing an education program and presenting 11 lectures to public organizations, and surveying approximately 1 mi{sup 2} of the Hanford Site for cultural resources. 7 refs., 4 figs., 4 tabs.

  12. Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 3 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2013 Work Plan Topics: Groundwater Surface water Storm water Consent Order EMR-FY13-WP - September 26, 2012 (12.78

  13. Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 4 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2014 Work Plan Topics: Groundwater Surface water Air Quality Consent Order EMR-FY14-WP - September 25, 2013 (14.51

  14. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent Order TA-49 Remediation TA-21 Remediation Material Disposal Areas WM-FY14-WP - September 25, ...

  15. Waste Management Committee Fiscal Year 2015 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY15-WP - November 17, 2014 (255.83

  16. First interim report of the Federal Fleet Conversion Task Force

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The Federal Fleet Conversion Task Force was created by Executive Order 12844, signed by President Clinton on April 21, 1993. In the Order, the President directed that purchases of alternative fueled vehicles by the Federal Government be substantially increased beyond the levels required by current law. The President charged the Task Force with developing recommendations for carrying out the Executive Order, with special emphasis on setting a course that will lead to the widespread use of alternative fueled vehicles by Federal, State, and local government fleets, by private fleets and, ultimately, by individuals. The chief recommendation of the Task Force is the establishment of a Presidential Clean Cities Initiative. To support creation of the Presidential Initiative, the Task Force identified 38 cities and regions, prioritized into three tiers, for concentrating the Initiative`s efforts in Fiscal Years 1994 through 1996. This concentration of effort is key to the effectiveness of the Initiative. The 38 cities and regions would receive priority funding for Federal vehicle purchases and for infrastructure development. In addition, the Task Force has made specific recommendations for overcoming numerous regulatory, economic, and technical barriers that have slowed the introduction of alternative fueled vehicles into general use.

  17. Fiscal Year 2015 Annual Environmental Justice Implementation...

    Energy Savers [EERE]

    Fiscal Year 2015 Annual Environmental Justice Implementation Progress Report Fiscal Year 2015 Annual Environmental ... More Documents & Publications Draft FY 2016-2018 Action Agenda ...

  18. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Topics: ... More Documents & Publications Waste Management Committee Fiscal Year 2015 Work Plan ...

  19. Environmental Monitoring and Remediation Committee Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work Plan Topics: ... Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Waste ...

  20. Hydrogen program summary Fiscal Year 1994

    SciTech Connect (OSTI)

    Not Available

    1995-03-01

    The annual program summary provides stakeholders within the hydrogen community with a snapshop of important advances that have occurred in the National Hydrogen Program over the fiscal year, including industry interactions and cooperation. The document will also be used to encourage additional potential industrial partners to join the Hydrogen Program Team. Fiscal Year 1994 marked a turning point for the Hydrogen Program, with a budget that grew significantly. The focus of the program was broadened to include development of hydrogen production technologies using municipal solid waste and biomass, in addition to an increased emphasis on industrial involvement and near-term demonstration projects. In order to maintain its near- and long-term balance, the Hydrogen Program will continue with basic, fundamental research that provides the long-term, high-risk, high-payoff investment in hydrogen as an energy carrier.

  1. Webtrends Archives by Fiscal Year — Geothermal

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Geothermal Technologies Office, Webtrends archives by fiscal year.

  2. Webtrends Archives by Fiscal Year — FEMP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Federal Energy Management Program, Webtrends archives by fiscal year.

  3. Webtrends Archives by Fiscal Year — Buildings

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Building Technologies Office, Webtrends archives by fiscal year.

  4. Webtrends Archives by Fiscal Year - Green Power and Greensburg...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Green Power and Greensburg Webtrends Archives by Fiscal Year - Green Power and Greensburg ... Archives by Fiscal Year - News Webtrends Archives by Fiscal Year - Tribal Energy Program

  5. Bioenergy Technologies Office Fiscal Year 2014 Annual Report...

    Office of Environmental Management (EM)

    Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report beto2014annualreport.pdf ...

  6. Executive Order 13031-Federal Alternative Fueled Vehicle Leadership...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Executive Order 12969-Federal Acquisition and Community RightTo-Know EO 13089 -- Coral Reef Protection NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL ...

  7. Richland Operations Office's Fiscal Year...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (fiscal year 2015) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 10,899,475 Award Fee Earned: 10,591,975 Award Fee Area ...

  8. Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 5 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2015 Work Plan Topics: TA-54 Groundwater Surface water sediment Air Quality NMED Consent Order EMR-FY15-WP - November 19, 2014 (255.83

  9. Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan | Department of Energy 6 Work Plan Environmental Monitoring and Remediation Committee Fiscal Year 2016 Work Plan Topics: Track Lifecycle Baseline Data TA-54 Groundwater Surface water sediment Air Quality NMED Consent Order EM&R-FY16-WP - March 9, 2016 (181.05

  10. Waste Management Committee Fiscal Year 2016 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP Recovery Operations Waste Stored at Waste Control Specialists Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY16-WP - March 9, 2016 (107.69

  11. 2012-01 "Fiscal Year 2014 Budget Request for LANL Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work" | Department of Energy 1 "Fiscal Year 2014 Budget Request for LANL Environmental Management Work" 2012-01 "Fiscal Year 2014 Budget Request for LANL Environmental Management Work" It is the intent of the NNMCAB to support FY 2014 funding for LANL at the full baseline level and to support additional funding from Headquarters/DOE through fiscal year 2015, in order to complete scope on the Consent Order schedule requirements, and to meet DOE/EM goals. It is also

  12. Task Cover

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The task involves 1) occupational medicine; 2) Wellness; 3) Ergonomics; 4) Industrial Hygiene; 5) Personal Exposure and Workplace Monitoring; 6) Ventilation Program; 7) Radiation; ...

  13. Simplified Predictive Models for CO2 Sequestration Performance Assessment: Research Topical Report on Task #4 - Reduced-Order Method (ROM) Based Models

    SciTech Connect (OSTI)

    Mishra, Srikanta; Jin, Larry; He, Jincong; Durlofsky, Louis

    2015-06-30

    Reduced-order models provide a means for greatly accelerating the detailed simulations that will be required to manage CO2 storage operations. In this work, we investigate the use of one such method, POD-TPWL, which has previously been shown to be effective in oil reservoir simulation problems. This method combines trajectory piecewise linearization (TPWL), in which the solution to a new (test) problem is represented through a linearization around the solution to a previously-simulated (training) problem, with proper orthogonal decomposition (POD), which enables solution states to be expressed in terms of a relatively small number of parameters. We describe the application of POD-TPWL for CO2-water systems simulated using a compositional procedure. Stanford’s Automatic Differentiation-based General Purpose Research Simulator (AD-GPRS) performs the full-order training simulations and provides the output (derivative matrices and system states) required by the POD-TPWL method. A new POD-TPWL capability introduced in this work is the use of horizontal injection wells that operate under rate (rather than bottom-hole pressure) control. Simulation results are presented for CO2 injection into a synthetic aquifer and into a simplified model of the Mount Simon formation. Test cases involve the use of time-varying well controls that differ from those used in training runs. Results of reasonable accuracy are consistently achieved for relevant well quantities. Runtime speedups of around a factor of 370 relative to full- order AD-GPRS simulations are achieved, though the preprocessing needed for POD-TPWL model construction corresponds to the computational requirements for about 2.3 full-order simulation runs. A preliminary treatment for POD-TPWL modeling in which test cases differ from training runs in terms of geological parameters (rather than well controls) is also presented. Results in this case involve only small differences between

  14. Budget estimates, fiscal year 1997. Volume 12

    SciTech Connect (OSTI)

    1996-03-01

    This report contains the fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1997.

  15. Fiscal Year 2008 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2008 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  16. Fiscal Year 2009 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2009 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  17. Fiscal Year 2007 budget-in-brief

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Fiscal Year 2007 budget request from the Department of Energy’s Office of Energy Efficiency and Renewable Energy.

  18. Google Archives by Fiscal Year — Solar

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Solar Energy Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  19. Google Archives by Fiscal Year — Greensburg

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Greensburg site for fiscal year 2012.

  20. Webtrends Archives by Fiscal Year — News

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the News site by fiscal year.

  1. Webtrends Archives by Fiscal Year — Deployment

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Deployment site for fiscal year 2011.

  2. Webtrends Archives by Fiscal Year — Multimedia

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Multimedia site for fiscal year 2011.

  3. Webtrends Archives by Fiscal Year — Solar

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Solar Energy Technologies Office / Sunshot sites, Webtrends archives by fiscal year.

  4. Webtrends Archives by Fiscal Year — Calculators

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archive for the Calculators site for fiscal year 2011.

  5. Webtrends Archives by Fiscal Year — Education

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Education site by fiscal year.

  6. Google Archives by Fiscal Year — FEMP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Federal Energy Management Program, retired Google Analytics profiles for the sites by fiscal year.

  7. Google Archives by Fiscal Year — Buildings

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Building Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  8. Webtrends Archives by Fiscal Year — Commercialization

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Commercialization site by fiscal year.

  9. 2015-04 "Fiscal Year 2017 Project Prioritization" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 "Fiscal Year 2017 Project Prioritization" 2015-04 "Fiscal Year 2017 Project Prioritization" It is the intent of the of this recommendation that the NNMCAB have input into developing the budget priorities for FY 2017, in order to assist in the completion of clean up scope on the CO requirements. Rec 2015-04 - May 20, 2015 (498.92

  10. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  11. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  12. Webtrends Archives by Fiscal Year - Social Media Site | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Social Media site for fiscal year 2011. Social Media FY11 (2.06 MB) More Documents & Publications Webtrends Archives by Fiscal Year - Energy Basics Webtrends Archives by Fiscal ...

  13. EMSL Fiscal Year 2008 Annual Report

    SciTech Connect (OSTI)

    Showalter, Mary Ann

    2009-01-23

    This annual report provides details on the research conducted at EMSL--the Environmental Molecular Sciences Laboratory in Fiscal Year 2008.

  14. Fiscal Year 2010 Budget-in-Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency and Renewable Energy Fiscal Year 2010 Budget-in-Brief www.eere.energy.gov Table of Contents Table of Contents...................................................................................................................................... 2 Preface ...................................................................................................................................................... 3 Highlights:

  15. Webtrends Archives by Fiscal Year — States

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the State Activities and State and Local Energy Efficiency Action Network sites by fiscal year.

  16. Webtrends Archives by Fiscal Year - Business Administration ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Business Administration Webtrends Archives by Fiscal Year - Business Administration From the EERE Web Statistics Archive: Office of Business Administration (later renamed to ...

  17. Google Archives by Fiscal Year — ERAC

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Efficiency and Renewables Advisory Committee site for fiscal year 2012-13.

  18. Webtrends Archives by Fiscal Year — WIP

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: WIP, Webtrends archives for the site, including EECBG, Solution Center, and Weatherization Assistance Program, by fiscal year.

  19. Guidance for Fiscal Year 2015 Facilities Information Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations PDF...

  20. Guidance for Fiscal Year 2015 Facilities Information Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FIMS VALIDATION ...

  1. DOE Announces Acquisition Strategy for Post Fiscal Year 2016...

    Office of Environmental Management (EM)

    DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos ...

  2. Google Archives by Fiscal Year - Multimedia Site | Department...

    Office of Environmental Management (EM)

    Google Archives by Fiscal Year - Multimedia Site Google Archives by Fiscal Year - Multimedia Site From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics ...

  3. Webtrends Archives by Fiscal Year - Information Center | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Information Center site for fiscal year 2011. Information Center FY11 (2.6 MB) More Documents & Publications Webtrends Archives by Fiscal Year - Office of EERE Webtrends Archives ...

  4. State Energy Program Fiscal Year 2016 Competitive Funding Opportunity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2016 Competitive Funding Opportunity Announcement State Energy Program Fiscal Year 2016 Competitive Funding Opportunity Announcement The U.S. Department of Energy's ...

  5. Fiscal Year 2013 Budget Request Briefing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2013 Budget Request Briefing Fiscal Year 2013 Budget Request Briefing Program budget overview PDF icon gtpfy13budgetrequestoverview.pdf More Documents & ...

  6. EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual ...

  7. Fiscal Year 2013 Small Business Contracting Goals | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2013 Small Business Contracting Goals Fiscal Year 2013 Small Business Contracting Goals DOE has received the following revised small business contracting goals for ...

  8. Webtrends Archives by Fiscal Year - Plans, Implementation, and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year - Plans, Implementation, and Results From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Plans, Implementation, and Results site by fiscal ...

  9. Supplemental Information for Fiscal Year 2017 Project Prioritization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Information for Fiscal Year 2017 Project Prioritization Supplemental Information for Fiscal Year 2017 Project Prioritization Topic: David Rhodes DOE, Provided ...

  10. Federal Geothermal Research Program Update - Fiscal Year 2004...

    Open Energy Info (EERE)

    Geothermal Research Program Update - Fiscal Year 2004 Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Federal Geothermal Research Program Update - Fiscal...

  11. The Department of Energy's Nuclear Waste Fund's Fiscal Year 2011...

    Office of Environmental Management (EM)

    The Department of Energy's Nuclear Waste Fund's Fiscal Year 2011 Financial Statements ... on "The Department of Energy's Nuclear Waste Fund's Fiscal Year 2011 Financial ...

  12. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  13. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Recommendation(s) for each site.

  14. Climate Change Task Force Webinar Series | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State, Local, and Tribal Leaders Task Force on Climate Preparedness and Resilience. ... Task Force on Climate Preparedness and Resilience, established by an Executive Order in ...

  15. Webtrends Archives by Fiscal Year — Advanced Manufacturing Office

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Advanced Manufacturing Office, Webtrends archives by fiscal year.

  16. Geothermal Technologies Program Fiscal Year 2013 Budget Request Presentation

    SciTech Connect (OSTI)

    DOE

    2012-03-13

    Geothermal Technologies Program fiscal year 2103 budget request presentation by Doug Hollett, Program Manager.

  17. Fiscal Year 2008 Budget-in-Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Budget-in-Brief Fiscal Year 2008 Budget-in-Brief Fiscal Year 2008 budget request from the Department of Energy's Office of Energy Efficiency and Renewable Energy. FY08_budget_brief.pdf (448.5 KB) More Documents & Publications Fiscal Year 2009 Budget-in-Brief Fiscal Year 2010

  18. 2012-03 "Fiscal Year 2013 and 2014 Budget Appropriation" | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 3 "Fiscal Year 2013 and 2014 Budget Appropriation" 2012-03 "Fiscal Year 2013 and 2014 Budget Appropriation" It is the intent of the NNMCAB to support FY 2013 and FY 2014 funding for LANL at levels that will adequately support clean-up work in progress, in order to complete scope on the Consent Order schedule deadlines, and to fulfill DOE-EM, LANL, and NMED agreements. Rec 2012-03 - September 26, 2012 (134.64

  19. 2016-02 "Fiscal Year 2018 Budget Priorities" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 "Fiscal Year 2018 Budget Priorities" 2016-02 "Fiscal Year 2018 Budget Priorities" It is the intent of this recommendation that the NNMCAB have input into developing the budget priorities for the FY 2018, in order to assist in the completion of legacy clean-up work to be included in the newly established Order on Consent. It is also intended to maximize time and effort and taxpayer dollars. Rec 2016-02 - March 30, 2016 (510.03 KB) More Documents & Publications 2016-03

  20. Fiscal Year 2014 Revegetation Assessment

    SciTech Connect (OSTI)

    Nordstrom, Jenifer

    2015-03-01

    This report summarizes the Fiscal Year 2014 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to document revegetation efforts at Idaho National Laboratory to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Five disturbed sites were evaluated for this assessment. Four sites are recommended to be removed from the annual assessment, and one is recommended for continued evaluation. New sites are also identified for future monitoring as part of the annual assessment.

  1. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program`s oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994.

  2. EM-LA Fiscal Year 2016 Budget

    Broader source: Energy.gov [DOE]

    At the January 27, 2016 Board Meeting Genna Hackett, DOE Los Alamos Field Office, provided a presentation on the Los Alamos Environmental Management Filed Office Budget for Fiscal Year 2016.

  3. Webtrends Archives by Fiscal Year - Commercialization | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Corporate sites, Webtrends archives for the Commercialization site by fiscal year. Commercialization FY09 (2.49 MB) Commercialization FY10 (2.41 MB) Commercialization FY11 (2.81 ...

  4. Fiscal Year 2008 Budget-in-Brief

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency and Renewable Energy Fiscal Year 2008 Budget-in-Brief www.eere.energy.gov TABLE OF CONTENTS Page Preface...................................................................................................................................................... 3 Biomass and Biorefinery Systems R&D Program.................................................................................. 6 Building Technologies Program

  5. Webtrends Archives by Fiscal Year — Vehicles

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Vehicle Technologies Office, Webtrends archives for the site, including the Alternative Fuels Data Center, EPAct Transportation Regulatory Activities, and Clean Cities by fiscal year.

  6. Environmental fiscal reform (EFR) | Open Energy Information

    Open Energy Info (EERE)

    also an area that may not have received enough attention in the past, from both fiscal or environmental experts and their associated institutions."1 "To use market forces to drive...

  7. EERE Fiscal Year 2012 Website Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    At the end of Fiscal Year 2012 (FY12), the EERE Web enterprise consisted of 152 websites ... to begin the process of aligning its Web presence with energy.gov, DOE's central website. ...

  8. EERE Fiscal Year 2011 Website Annual Report

    Broader source: Energy.gov (indexed) [DOE]

    Views 05 Average Visit Duration 06 Top 20 Web Sites by Visits 06 Top 20 Visited Pages 07 ... At the end of fiscal year 2011 (FY11), the EERE Web enterprise consisted of more than 170 ...

  9. Budget estimates fiscal year 1995: Volume 10

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report contains the Nuclear Regulatory Commission (NRC) fiscal year budget justification to Congress. The budget provides estimates for salaries and expenses and for the Office of the Inspector General for fiscal year 1995. The NRC 1995 budget request is $546,497,000. This is an increase of $11,497,000 above the proposed level for FY 1994. The NRC FY 1995 budget request is 3,218 FTEs. This is a decrease of 75 FTEs below the 1994 proposed level.

  10. Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

  11. Office of EERE: Fiscal Year 2016 Request Budget

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Office of EERE About Share this resource Send a link to Office of EERE: Fiscal Year 2016 Request Budget to someone by E-mail Share Office of EERE: Fiscal Year 2016...

  12. Two EM Contractors Are Among Fiscal Year 2015 Small Business...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Two EM Contractors Are Among Fiscal Year 2015 Small Business Award Winners Two EM Contractors Are Among Fiscal Year 2015 Small Business Award Winners June 15, 2016 - 12:05pm ...

  13. Their best defense is good fiscal sense (Daily Press) | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsarticlestheir-best-defense-good-fiscal-sense-daily-press Their best defense is good fiscal sense Top Guard Security finds it can be a good idea to say,...

  14. Webtrends Archives by Fiscal Year - Kids Site | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Kids site by fiscal year. Kids FY09 (2.06 MB) Kids FY10 (2.1 MB) Kids FY11 (2.18 MB) More Documents & Publications Webtrends Archives by Fiscal Year - Office of EERE Webtrends ...

  15. Waste Management Committee Fiscal Year 2013 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Work Plan Waste Management Committee Fiscal Year 2013 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles TA-49 Fiscal Year 2012 Budget WM-FY13-WP - September 26, 2012 (13.32

  16. Fiscal Year 2016 Call for Nuclear Safety Research and Development...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FROM: SUBJECT: Fiscal Year 2016 Call for Nuclear Safety Research and Development Proposals The purpose of this memorandum is to inform you of the Fiscal Year 2016 Call for ...

  17. Department of Energy's Nuclear Waste Fund's Fiscal Year 2012...

    Office of Environmental Management (EM)

    Nuclear Waste Fund's Fiscal Year 2012 Financial Statements OAS-FS-13-05 November 2012 U.S. ... Report on "Department of Energy's Nuclear Waste Fund's Fiscal Year 2012 Financial ...

  18. Department of Energy's Nuclear Waste Fund's Fiscal Year 2014...

    Office of Environmental Management (EM)

    Nuclear Waste Fund's Fiscal Year 2014 Financial Statement Audit OAS-FS-15-03 November 2014 ... Report on "Department of Energy's Nuclear Waste Fund's Fiscal Year 2014 Financial ...

  19. Webtrends Archives by Fiscal Year — EERE Home Page

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the EERE home page by fiscal year.

  20. Webtrends Archives by Fiscal Year — Energy Innovation Portal

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Energy Innovation Portal by fiscal year.

  1. Webtrends Archives by Fiscal Year — Energy Basics

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Energy Basics site by fiscal year.

  2. Webtrends Archives by Fiscal Year — Topic Landing Pages

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the topic landing pages by fiscal year.

  3. Hanford Site Groundwater Monitoring for Fiscal Year 2001

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2002-02-28

    This report provides information on the status of groundwater monitoring at the Hanford Site during fiscal year 2001.

  4. Webtrends Archives by Fiscal Year — Green Power and Greensburg

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Green Power and Greensburg sites by fiscal year.

  5. Webtrends Archives by Fiscal Year — Business Administration

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Office of Business Administration (later renamed to Business Operations), Webtrends archives by fiscal year.

  6. Webtrends Archives by Fiscal Year — Communication Standards

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Communication Standards site by fiscal year.

  7. Webtrends Archives by Fiscal Year — Tribal Energy Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Tribal Energy Program site by fiscal year.

  8. Webtrends Archives by Fiscal Year — International Activities

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the International Activities site for fiscal year 2011.

  9. Webtrends Archives by Fiscal Year — Information Center

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Information Center site for fiscal year 2011.

  10. Slides from Secretary Moniz's Fiscal Year 2017 Budget Presentation

    Broader source: Energy.gov [DOE]

    See slides from Energy Secretary Ernest Moniz's presentation on the Department of Energy's fiscal year 2017 budget request to Congress.

  11. Webtrends Archives by Fiscal Year — Financial Opportunities

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Financial Opportunities site by fiscal year.

  12. Webtrends Archives by Fiscal Year — Social Media Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Social Media site for fiscal year 2011.

  13. Webtrends Archives by Fiscal Year — Publication Library

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the EERE Publication and Product Library by fiscal year.

  14. Webtrends Archives by Fiscal Year — Plans, Implementation, and Results

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Plans, Implementation, and Results site by fiscal year.

  15. Webtrends Archives by Fiscal Year — Earth Day

    Office of Energy Efficiency and Renewable Energy (EERE)

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Earth Day site by fiscal year.

  16. Google Archives by Fiscal Year — Energy Saver

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profiles for the Energy Saver sites by fiscal year.

  17. Webtrends Archives by Fiscal Year — Lose Your Excuse

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Lose Your Excuse sites by fiscal year.

  18. Google Archives by Fiscal Year — Office of EERE

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Office of EERE, retired Google Analytics profiles for the sites by fiscal year.

  19. Webtrends Archives by Fiscal Year — Solar Decathlon

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, Webtrends archives for the Solar Decathlon site by fiscal year.

  20. Bioenergy Technologies Office Fiscal Year 2014 Annual Report | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report Bioenergy Technologies Office Fiscal Year 2014 Annual Report beto_2014_annual_report.pdf (5.36 MB) More Documents & Publications November 2013 News Blast August 2014 Monthly News Blast Growing America's Energy Future: Bioenergy Technologies Office Successes of 2014

  1. Fiscal Year 2007 Budget-in-Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Budget-in-Brief Fiscal Year 2007 Budget-in-Brief Fiscal Year 2007 budget request from the Department of Energy's Office of Energy Efficiency and Renewable Energy. FY07_budget_brief.pdf (513.76 KB) More Documents & Publications FY2006 Budget-in-Brief Fiscal Year 2009

  2. Fiscal Year 2009 Budget-in-Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Budget-in-Brief Fiscal Year 2009 Budget-in-Brief Fiscal Year 2009 budget request from the Department of Energy's Office of Energy Efficiency and Renewable Energy. FY09_budget_brief.pdf (438.08 KB) More Documents & Publications The FY 2005 Budget Request Fiscal Year 2010 Budget-in-Brief The FY 2006 Budget Request

  3. Fiscal Year 2010 Budget-in-Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Budget-in-Brief Fiscal Year 2010 Budget-in-Brief Fiscal Year 2010 budget request from the Department of Energy's Office of Energy Efficiency and Renewable Energy fy10_budget_brief.pdf (504.14 KB) More Documents & Publications The FY 2005 Budget Request The FY 2006 Budget Request Fiscal Year 2009 Budget-in-Brief

  4. NetCAP status report for the end of fiscal year 2010.

    SciTech Connect (OSTI)

    Hamlet, Benjamin Roger; Young, Christopher John

    2010-10-01

    Fiscal year 2010 (FY10) is the second full year of NetCAP development and the first full year devoted largely to new feature development rather than the reimplementation of existing capabilities found in NetSim (Sereno et al., 1990). Major tasks completed this year include: (1) Addition of hydroacoustic simulation; (2) Addition of event Identification simulation; and (3) Initial design and preparation for infrasound simulation. The Network Capability Assessment Program (NetCAP) is a software tool under development at Sandia National Laboratories used for studying the capabilities of nuclear explosion monitoring networks. This report discusses motivation and objectives for the NetCAP project, lists work performed prior to fiscal year 2010 (FY10) and describes FY10 accomplishments in detail.

  5. TaskFarmer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TaskFarmer TaskFarmer TaskFarmer is a utility developed in-house at NERSC to farm tasks onto a compute node - these can be single- or multi-core tasks. It tracks which tasks have completed successfully, and allows straightforward re-submission of failed or un-run jobs from a task list. The base functionality is contained within the runcommands.sh script which is provided by Taskfarmer. The script will be added to your path after loading the Taskfarmer module. This script launches a server on the

  6. FISCAL YEAR 2014-2019 STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Build & maintain an efficient & effective organization Hold recipients & overseers of Department funds accountable for actions that result in fraud, waste and/or abuse Provide independent, accurate, timely, and balanced information to the Department, Congress, and other key stakeholders FISCAL YEAR 2014-2019 STRATEGIC PLAN

  7. Task Time Tracker

    Energy Science and Technology Software Center (OSTI)

    2013-07-24

    This client-side web app tracks the amount of time spent on arbitrary tasks. It allosw the creation of an unlimited number of arbitrarily named tasks ans via simple interactions, tracks the amount of time spent working on the drfined tasks.

  8. Hanford Site Groundwater Monitoring for Fiscal Year 1999

    SciTech Connect (OSTI)

    MJ Hartman; LF Morasch; WD Webber

    2000-05-10

    This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 1999 on the US. Department of Energy's Hanford Site, Washington. Water-level monitoring was performed to evaluate groundwater flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Measurements for site-wide maps were conducted in June in past years and are now measured in March to reflect conditions that are closer to average. Water levels over most of the Hanford Site continued to decline between June 1998 and March 1999. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of carbon-14, strontium-90, technetium-99, and uranium also exceeded drinking water standards in smaller plumes. Cesium-137 and plutonium exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in US Department of Energy Order 5400.5 were exceeded for plutonium, strontium-90, tritium, and uranium in small plumes or single wells. Nitrate and carbon tetrachloride are the most extensive chemical contaminants. Chloroform, chromium, cis-1,2dichloroethylene, cyanide, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous wells; however, in most cases, they are believed to represent natural components of groundwater. ''Resource Conservation and Recovery Act of 1976'' groundwater monitoring continued at 25 waste management areas during fiscal year 1999: 16 under detection programs and data indicate that they are not adversely affecting groundwater; 6 under interim status groundwater quality assessment programs to assess contamination; and 2 under final status corrective-action programs. Another site, the 120-D-1 ponds, was clean closed in

  9. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: HPM Corporation (HPMC) Contract: Occupational Medical Services at DOE Hanford Contract Number: DE-EM0002043 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $300,000.00 Award Fee Earned: $284,250.00 Award Fee Area Adjectival Ratings: Performance Incentive Adjectival Rating Allocated Percent Earned Percent Amount Available Amount Earned 1.0: Worker

  10. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: Mission Support Alliance, LLC (MSA) Contract: Mission Support Contract Contract Number: DE-AC06-09RL14728 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $21,030,647 Award Fee Earned: $19,352,402 (92%) Award Fee Area Adjectival Ratings: Objective: Excellent (96%) $12,117,859 Subjective: Very Good (86%) $7,234,543 The contractor met or exceeded

  11. National Defense Authorization Act for Fiscal Year 2000 § 3164:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Whistleblower Protection Program | Department of Energy National Defense Authorization Act for Fiscal Year 2000 § 3164: Whistleblower Protection Program National Defense Authorization Act for Fiscal Year 2000 § 3164: Whistleblower Protection Program Stakeholders: DOE Employees and Contractors engaged in defense activities for the Department Scope: Section 3164 of the National Defense Authorization Act for Fiscal Year 2000 implements a whistleblower protection program to ensure that covered

  12. Geothermal Technologies Program Fiscal Year 2013 Budget Request

    Office of Scientific and Technical Information (OSTI)

    Presentation (Program Document) | SciTech Connect Fiscal Year 2013 Budget Request Presentation Citation Details In-Document Search Title: Geothermal Technologies Program Fiscal Year 2013 Budget Request Presentation Geothermal Technologies Program fiscal year 2103 budget request presentation by Doug Hollett, Program Manager. Authors: DOE Publication Date: 2012-03-13 OSTI Identifier: 1219566 Resource Type: Program Document Research Org: EERE Publication and Product Library Sponsoring Org:

  13. Fossil Energy Fiscal Year 2012 Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2012 Budget Request Fossil Energy Fiscal Year 2012 Budget Request March 30, 2011 - 2:40pm Addthis Statement of Dr. Victor Der, Acting Assistant Secretary for Fossil Energy before the House Committee on Appropriations Subcommittee on Energy and Water Development. Mr. Chairman, Members of the Committee, it is my pleasure to appear before you today to present the Office of Fossil Energy's (FE) proposed Budget for Fiscal Year 2012. The Office of Fossil Energy's primary objective is to

  14. OCRWM annual report to Congress, fiscal year 1997

    SciTech Connect (OSTI)

    1998-07-01

    This report presents the progress in the activities of the Office of Civilian Radioactive Waste Management. Chapters include: Yucca Mountain site characterization project; Waste acceptance, storage and transportation project; Program management; Working with external parties; and Financial management. Also included in five appendices are: financial statements; key federal laws and regulations; fiscal year 1997 Congressional testimony and meetings with regulators and oversight bodies; OCREM publications for fiscal year 1997; and selected publications from other organizations during fiscal year 1997.

  15. FEMP First Thursday Update Covers Fiscal Year 2015 Government Performance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Toward Energy and Sustainability Goals | Department of Energy Covers Fiscal Year 2015 Government Performance Toward Energy and Sustainability Goals FEMP First Thursday Update Covers Fiscal Year 2015 Government Performance Toward Energy and Sustainability Goals July 6, 2016 - 2:03pm Addthis The U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) will present Fiscal Year 2015 Government Performance Toward Energy and Sustainability Goals, a new First Thursday Update on

  16. Fiscal Year 2012 Congressional Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Congressional Budget Fiscal Year 2012 Congressional Budget The Fiscal Year 2012 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. fy12_budget.pdf (6.04 MB) More Documents & Publications FY 2012 Budget Request to Congress (Volume 3) Fiscal Year 2011 Congressional Budget Details of the FY 2014 Congressional Budget Request for OE

  17. Google Archives by Fiscal Year — Mobile Site

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Mobile site for fiscal year 2012-13.

  18. Fiscal Year 2015 Vehicle Technologies Office Incubator Funding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office Incubator Funding Opportunity Announcement Fiscal Year 2015 Vehicle Technologies Office Incubator Funding Opportunity Announcement The list of eight awardees given funds to...

  19. Procurement Organization, Sandia National Laboratories. Annual report, fiscal year 1995

    SciTech Connect (OSTI)

    Stimak, D.R.

    1996-05-01

    This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1995. Activities for both the New Mexico and California locations are included.

  20. Annual report procurement organization Sandia National Laboratories fiscal year 1996

    SciTech Connect (OSTI)

    Palmer, D.L.

    1997-04-01

    This report summarizes the purchasing and transportation activities of the Procurement Organization for Fiscal Year 1996, Activities for both the New Mexico and California locations are included.

  1. National Defense Authorization Act for Fiscal Year 2005, Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request, | Department of Energy National Defense Authorization Act for Fiscal Year 2005, Information Request, National Defense Authorization Act for Fiscal Year 2005, Information Request, Section 3116 from "National Defense Authorization Act for Fiscal Year 2005" (Public Law 108-375 Oct. 28 2004) Transition_2008_2009_EM_Additional_Material_MA_Copy.pdf PUBLIC LAW 108-375-OCT. 28, 2004 118 STAT. 1811 Public Law 108-375, 108th Congress National Defense Authorization Act for Fiscal

  2. Frequently Asked Questions (FAQs) for Fiscal Year (FY) 14 Brownfields...

    Open Energy Info (EERE)

    (FAQs) for Fiscal Year (FY) 14 Brownfields Assessment, Revolving Loan Fund and Cleanup Grants Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  3. Fiscal Year 2017 Project Prioritization | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Project Prioritization Fiscal Year 2017 Project Prioritization Topic: David Rhodes DOE, Provided Information on FY'17 Projects for the NNMCB to Prioritize. PDF icon FY'17 ...

  4. Fiscal Year 2015 Vehicle Technologies Program Wide Funding Opportunity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2015 Vehicle Technologies Program Wide Funding Opportunity Announcement Selections The list of 24 awardees given funds to develop and deploy cutting-edge vehicle ...

  5. Google Archives by Fiscal Year — Social Media Site

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profiles for the Social Media site for fiscal years 2012-14.

  6. Fiscal Year 2013 Department of Energy Annual Occupational Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety and Health Report for Federal Employees to the Secretary of Labor Fiscal Year 2013 Department of Energy Annual Occupational Safety and Health Report for Federal ...

  7. Google Archives by Fiscal Year — Earth Day

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profiles for the Earth Day site for fiscal year 2012-13.

  8. Office of Energy Efficiency and Renewable Energy Fiscal Year...

    Energy Savers [EERE]

    Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and Manufacturing Office of Energy Efficiency and Renewable ...

  9. Office of Energy Efficiency and Renewable Energy Fiscal Year...

    Office of Environmental Management (EM)

    Renewable Electricity Generation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Renewable Electricity Generation Office of Energy Efficiency and ...

  10. Webtrends Archives by Fiscal Year — EERE Totals

    Office of Energy Efficiency and Renewable Energy (EERE)

    Historical EERE office total reports include only Webtrends archives by fiscal year. EERE total reports dating after FY11 can be accessed in EERE's Google Analytics account.

  11. Office of Energy Efficiency and Renewable Energy Fiscal Year...

    Energy Savers [EERE]

    Sustainable Transportation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Sustainable Transportation Office of Energy Efficiency and Renewable ...

  12. Combined Fiscal Year (FY) 2002 Annual Performance Report and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY ...

  13. Combined Fiscal Year (FY) 2006 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report presents the goals, objectives, and strategies for measuring the OIG's FY 2006 actual performance and FY 2007 planned activities. Combined Fiscal Year (FY) 2006 Annual ...

  14. Combined Fiscal Year (FY) 2011 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities. Combined Fiscal Year (FY) 2011 Annual ...

  15. Combined Fiscal Year (FY) 2010 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report presents the goals, objectives, and strategies for measuring the OIG's FY 2010 actual performance and FY 2011 planned activities. Combined Fiscal Year (FY) 2010 Annual ...

  16. Combined Fiscal Year (FY) 2009 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report presents the goals, objectives, and strategies for measuring the OIG's FY 2009 actual performance and FY 2010 planned activities. Combined Fiscal Year (FY) 2009 Annual ...

  17. Combined Fiscal Year (FY) 2007 Annual Performance Results and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This report presents the goals, objectives, and strategies for measuring the OIG's FY 2007 actual performance and FY 2008 planned activities. Combined Fiscal Year (FY) 2007 Annual ...

  18. Webtrends Archives by Fiscal Year — Fuel Cells

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Fuel Cell Technologies Office, Webtrends archives for the site, including the Annual Merit Review and DOE Hydrogen Program, by fiscal year.

  19. Office of Energy Efficiency and Renewable Energy Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    Kathleen Hogan, Deputy Assistant Secretary May 1, 2013 Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and ...

  20. NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 2000 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    An Act to authorize appropriations for fiscal year 2000 for military activities of the Department of Defense, for military construction, and for defense activities of the ...

  1. Google Archives by Fiscal Year — Lose Your Excuse

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profiles for the Lose Your Excuse sites by fiscal year.

  2. Google Archives by Fiscal Year — Wind and Water

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Wind and Water Power Technologies Office, retired Google Analytics profiles for the sites by fiscal year.

  3. Google Archives by Fiscal Year — Maps and Data

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Maps and Data site for fiscal year 2012.

  4. Google Archives by Fiscal Year — Kids Site

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profile for the Kids site for fiscal year 2012-13.

  5. National Defense Authorization Act for Fiscal Year 2005, Information...

    Broader source: Energy.gov (indexed) [DOE]

    Section 3116 from "National Defense Authorization Act for Fiscal Year 2005" (Public Law 108-375 Oct. 28 2004) Transition20082009EMAdditionalMaterialMACopy.pdf PUBLIC LAW ...

  6. Webtrends Archives by Fiscal Year — Wind and Water

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Wind and Water Power Technologies Office, Webtrends archives for the sites, including Wind Powering America, by fiscal year.

  7. Laboratory directed research and development. Annual report, fiscal year 1995

    SciTech Connect (OSTI)

    1996-02-01

    This document is a compilation of the several research and development programs having been performed at the Pacific Northwest National Laboratory for the fiscal year 1995.

  8. Google Archives by Fiscal Year — Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profiles for the Plans, Implementation, and Results site for fiscal years 2012-14.

  9. Google Archives by Fiscal Year — Information Center

    Broader source: Energy.gov [DOE]

    From the EERE Web Statistics Archive: Corporate sites, retired Google Analytics profiles for the Information Center site for fiscal year 2012.

  10. Savannah River Site`s Site Specific Plan. Environmental restoration and waste management, fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

  11. Guidance for Fiscal Year 2015 Facilities Information Management System Data

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Validations | Department of Energy Fiscal Year 2015 Facilities Information Management System Data Validations Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FIMS VALIDATION GUIDANCE_FY 2015 with MEMO 141120 FINAL.pdf (1.46 MB) More Documents & Publications Microsoft PowerPoint - FY09_10 Validations_Archiving_090804 Three-year Rolling Timeline Three

  12. Fiscal Year 2015 Annual Small Business Awards Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Fiscal Year 2015 Annual Small Business Awards Program Fiscal Year 2015 Annual Small Business Awards Program Lists the FY 2015 Annual Small Business Awards Program Awardees FY-2015-Award-Recipients.pdf (661.72 KB) More Documents & Publications Small Business Award Winners - FY 2011 Presentations, Women-Owned Small Business Forum (May 2013) Audit Report: IG-0898

  13. Supplemental Information for Fiscal Year 2017 Project Prioritization |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Supplemental Information for Fiscal Year 2017 Project Prioritization Supplemental Information for Fiscal Year 2017 Project Prioritization Topic: David Rhodes DOE, Provided Additional Information on the Types of Clean-up Projects at LANL. FY'17 Prioritization - April 8, 2015 (403.36 KB

  14. Previous Fiscal Year FOIA Requests received by Golden Field Office

    Broader source: Energy.gov [DOE]

    Golden Field Office Status of FOIA Requests Received – Previous Fiscal Year, from the U.S. Department of Energy This document provides a listing of all FOIA requests received by the Golden Field Office in the past fiscal year, including a description of the FOIA request and the resolution of the FOIA request.

  15. Placing UESC Task Orders Under the GSA Areawide

    Broader source: Energy.gov [DOE]

    Webinar provides attendees with an overview of the contracting options and services available from their local utility companies to engineer, finance and install cost effective energy and water savings projects.

  16. Task Order Awarded for Technical and Safety Support Services

    Broader source: Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a contract for technical support services to Link Technologies, Inc., of Germantown, MD for support services to the DOE Office of Environmental Management in Washington D.C.

  17. DOE Awards Small Business Task Order for Technical Support to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 27, 2013 - 12:00pm Addthis Media Contact Lynette Chafin, 513-246-0461 ... Provide technical support for program planning, developing test plans, and ...

  18. DOE Awards Small Business Task Order for Technical Support to...

    Office of Environmental Management (EM)

    to TerranearPMC, LLC of Exton, PA to provide Spent Nuclear Fuel and Excess Nuclear Materials Disposition Planning technical support to the Office of Environmental Management. ...

  19. DE-DT0010454-Task-Order-4.pdf

    Office of Environmental Management (EM)

  20. DE-DT0010459-Task-Order-5.pdf

    Office of Environmental Management (EM)

  1. DOE Awards Small Business Task Order for Technical Support to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Environmental Management July 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today...

  2. ESPC Task Order Financial Schedules (IDIQ Attachment J-6)

    Broader source: Energy.gov [DOE]

    Document features worksheets federal agencies can use to determine guaranteed cost savings and contractor payments, energy conservation measure costs and savings, and more in an for an energy savings performance contract (ESPC).

  3. PROJECT TASK STATEMENT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PROJECT TASK STATEMENT BETWEEN Sandia Corporation AND British East India Company a corporation of the United Kingdom having a principal office in London, United Kingdom (hereinafter "Participant") Geothermal Dynamics This Project Task Statement (PTS) is under the authority and subject to all terms and conditions of Cooperative Research and Development Agreement (CRADA) No. SC##/####.##.##. A. PURPOSE Sandia National Laboratories (Sandia) and the British East India Company (BEIC) are

  4. Ordering Information

    Gasoline and Diesel Fuel Update (EIA)

    coal industry Natural gas trade (Table 4.3) Ordering Information This publication and other Energy Information Administration (EIA) publications may be purchased from the...

  5. State Energy Program Fiscal Year 2006 Formula Grant Guidance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Fiscal Year 2006 Formula Grant Guidance State Energy Program Fiscal Year 2006 Formula Grant Guidance State Energy Program (SEP) Program Notice 06-1 Fiscal Year 2006 Formula Grant Guidance fy06_grant_guidance.pdf (256.49 KB) More Documents & Publications WPN 06-8: Dun and Bradstreet Universal Numbering System (DUNS) and Central Contractor Registration (CCR) and Grants.Gov Reminder Audit Report: OAS-RA-10-05 State Energy Program Formula Grant Guidance Program Year 2007

  6. Consolidated financial statements for fiscal year 1996

    SciTech Connect (OSTI)

    1997-02-01

    The following overview and accompanying audited financial statements have been prepared for Fiscal Year (FY) 1996 to report the financial position and the results of operations of the Department of Energy. These statements include the consolidated Statement of Financial Position and the consolidated Statement of Operations and Changes in Net Position. The statements have been prepared in accordance with the Office of Management and Budget Bulletin No. 94-01, Form and Content for Agency Financial Statements, and were developed in accordance with the hierarchy of accounting standards described therein. The overview provides a narrative on the Department of Energy`s mission, activities, and accomplishments. Utilizing performance measures as the primary vehicle for communicating Departmental accomplishments and results, this overview discusses the most significant measures while others are discussed in the supplemental information to the financial statements.

  7. 1982 Orders

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOCKET FE CITE DATE NUMBER APPLICANT NAME ORDER NO. 70116.ERA 121482 82-04-LNG PhillipsMarathon 49 70552.ERA 113082 82-09-NG Northern Natural Gas 48 70541.ERA 110182...

  8. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives ...

  9. Fiscal Year 2006 Washington Closure Hanford Science & Technology Plan

    SciTech Connect (OSTI)

    K.J. Kroegler, M. Truex, D.J. McBride

    2006-01-19

    This Washington Closure Hanford science and technology (S&T) plan documents the activities associated with providing S&T support to the River Corridor Closure Project for fiscal year 2006.

  10. GreenBuy Award Winners By Fiscal Year

    Broader source: Energy.gov (indexed) [DOE]

    By Fiscal Year FY2015 GreenBuy Award Winners Site Name Award Products Categories Argonne National Lab (2 nd yr) Gold 13 products5 categories Brookhaven National Lab Gold 11 ...

  11. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor...

    Office of Environmental Management (EM)

    FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC Contract No.: DE-AC30-10CC40020 Award Period: October 1, 2013 through ...

  12. EM Exceeds Fiscal Year 2013 Small Business Goals

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – EM obligated nearly $385 million to prime small business contracts, or 7.9 percent of its $4.9 million procurement base, in fiscal year 2013, far surpassing its goals.

  13. Webtrends Archives by Fiscal Year - Tribal Energy Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Tribal Energy Program site by fiscal year. Tribal Energy Program FY09 (2.71 MB) Tribal Energy Program FY10 (2.44 MB) Tribal Energy Program FY11 (2.56 MB) More Documents & ...

  14. Webtrends Archives by Fiscal Year - Advanced Manufacturing Office...

    Broader source: Energy.gov (indexed) [DOE]

    Advanced Manufacturing Office, Webtrends archives by fiscal year. Advanced Manufacturing FY09 (2.15 MB) Advanced Manufacturing FY10 (2.13 MB) Advanced Manufacturing FY11 (2.13 MB) ...

  15. Webtrends Archives by Fiscal Year - Publication Library | Department...

    Broader source: Energy.gov (indexed) [DOE]

    EERE Publication and Product Library by fiscal year. Publication Library FY09 (1.85 MB) Publication Library FY10 (2.68 MB) Publication Library FY11 (2.96 MB) More Documents & ...

  16. Webtrends Archives by Fiscal Year - Office of EERE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Office of EERE site by fiscal year. Office of EERE FY09 (2.37 MB) Office of EERE FY10 (2.36 MB) Office of EERE FY11 (2.34 MB) More Documents & Publications Webtrends Archives by ...

  17. Webtrends Archives by Fiscal Year - Topic Landing Pages | Department...

    Broader source: Energy.gov (indexed) [DOE]

    topic landing pages by fiscal year. Topic Landing Pages FY10 (2.04 MB) Topic Landing Pages FY11 (2.02 MB) Topic Landing Pages FY12-FY13 (366.66 KB) More Documents & Publications ...

  18. Webtrends Archives by Fiscal Year - Solar Decathlon | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Solar Decathlon site by fiscal year. Solar Decathlon FY07 (2.28 MB) Solar Decathlon FY08 (2.23 MB) Solar Decathlon FY09 (2.26 MB) Solar Decathlon FY10 (2.18 MB) Solar Decathlon ...

  19. Webtrends Archives by Fiscal Year - Bioenergy | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Bioenergy Technologies Office, Webtrends archives by fiscal year. Bioenergy FY09 (2.05 MB) Bioenergy FY10 (2.09 MB) Bioenergy FY11 (2.09 MB) More Documents & Publications Webtrends ...

  20. Fiscal Year 2013 President's Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    House Appropriations Committee Subcommittee on Energy and Water Development Subject: Fiscal Year 2013 President's Budget Request Date: February 29, 2012 Testimony D'Agostino - 02/29/2012 (264.74

  1. Fiscal Year 2013 President's Budget Request | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Senate Appropriations Committee Subcommittee on Energy and Water Development Subject: Fiscal Year 2013 President's Budget Request Date: March 21, 2012 Testimony - D'Agostino - 03/21/2012 (632.58

  2. Environmental Molecular Sciences Laboratory Annual Report: Fiscal Year 2006

    SciTech Connect (OSTI)

    Foster, Nancy S.; Showalter, Mary Ann

    2007-03-23

    This report describes the activities and research performed at the Environmental Molecular Sciences Laboratory, a Department of Energy national scientific user facility at Pacific Northwest National Laboratory, during Fiscal Year 2006.

  3. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    SciTech Connect (OSTI)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  4. Federal Energy Regulatory Commission's Fiscal Year 2010 Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: ... The information in the Management's Discussion and Analysis is not a required part of ...

  5. AUDIT REPORT Federal Energy Regulatory Commission's Fiscal Year...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2015 Financial Statement Audit OAI-FS-16-02 November 2015 U.S. Department of ... in the Management's Discussion and Analysis section be presented to supplement the ...

  6. Hanford Site Groundwater Monitoring for Fiscal Year 2004

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2005-03-01

    This document presents the results of groundwater and vadose zone monitoring for fiscal year 2004 (October 2003 through September 2004)on the U.S. Department of Energy's Hanford Site in southeast Washington State.

  7. HONEYWELL - KANSAS CITY PLANT FISCAL YEARS 2009 THRU 2015 SMALL...

    National Nuclear Security Administration (NNSA)

    HONEYWELL - KANSAS CITY PLANT FISCAL YEARS 2009 THRU 2015 SMALL BUSINESS PROGRAM RESULTS & FORECAST CATEGORY Total Procurement Total SB Small Disad. Bus Woman-Owned SB Hub-Zone SB ...

  8. Hanford Site Services Contractor Receives Fiscal Year 2015 Evaluation

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) announced that contractor Mission Support Alliance, LLC (MSA) earned approximately 89 percent of available fee for services provided at the Hanford Site last fiscal year.

  9. Office of Packaging and Transportation Fiscal Year 2012 Annual Report |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Packaging and Transportation Fiscal Year 2012 Annual Report Office of Packaging and Transportation Fiscal Year 2012 Annual Report The Office of Environmental Management (EM) was established to mitigate the risks and hazards posed by the legacy of nuclear weapons production and research. The most ambitious and far ranging of these missions is dealing with the environmental legacy of the Cold War. Many problems posed by its operations are unique, and include the

  10. Groundwater Annual Status Report for Fiscal Year 1998

    SciTech Connect (OSTI)

    A. K. Stoker; A. S. Johnson; B. D. Newman; B. M. Gallaher; C. L. Nylander; D. B. Rogers; D. E. Broxton; D. Katzman; E. H. Keating; G. L. Cole; K. A. Bitner; K. I. Mullen; P. Longmire; S. G. McLin; W. J. Stone

    1999-04-01

    Groundwater protection activities and hydrogeologic characterization studies are conducted at LANL annually. A summary of fiscal year 1998 results and findings shows increased understanding of the hydrogeologic environment beneath the Pajarito Plateau and significant refinement to elements of the LANL Hydrogeologic Conceptual Model pertaining to areas and sources of recharge to the regional aquifer. Modeling, drilling, monitoring, and data collection activities are proposed for fiscal year 1999.

  11. Groundwater Annual Status Report for Fiscal Year 1999

    SciTech Connect (OSTI)

    C. L. Nylander; K. A. Bitner; K. Henning; A. S. Johnson; E. H. Keating; P. Longmire; B. D. Newman; B. Robinson; D. B. Rogers; W. J. Stone; D. Vaniman

    2000-03-01

    Groundwater protection activities and hydrogeologic characterization studies are conducted at Los Alamos National Laboratory annually. A summary of fiscal year 1999 results and findings shows increased understanding of the hydrogeologic environment beneath the Pajarito Plateau and significant refinement to elements of the LANL. Hydrogeologic Conceptual Model pertaining to areas and sources of recharge to the regional aquifer. Modeling, drilling, monitoring, and data collection activities are proposed for fiscal year 2000.

  12. Current Fiscal Year FOIA Requests received by Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Current Fiscal Year FOIA Requests received by Golden Field Office Current Fiscal Year FOIA Requests received by Golden Field Office Golden Field Office Status of FOIA Requests Received -- Current Quarter FY'16, from the U.S. Department of Energy. GFO Status of FOIA Requests Received (1.31 MB) More Documents & Publications EA-1245: Finding of No Significant Impact EA-1875: Final Environmental Assessment EA-1761: Final Environmental Assessment

  13. Fiscal Year 2015 - Conference Reporting Activities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fiscal Year 2015 - Conference Reporting Activities Fiscal Year 2015 - Conference Reporting Activities January 29, 2016 - 8:15am Addthis Conference Management Reporting and Spending - FY 2015 The Office of Management and Budget (OMB), on May 11, 2012, issued a memorandum to all agencies that contained steps to improve operations, increase efficiency, and cut unnecessary spending. Consistent with this guidance, the Department of Energy (DOE) is taking aggressive steps to ensure that

  14. EERE's Fiscal Year 2005 Budget in Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Budget in Brief EERE's Fiscal Year 2005 Budget in Brief This document provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2005 budget request to Congress. fy05_budget_brief.pdf (295.51 KB) More Documents & Publications FY2006 Budget-in-Brief Fiscal Year 2007 Budget-in-Brief The FY 2007 Budget Request - On the Threshold of Incredible Advances

  15. Fiscal Year 2011 Congressional Budget | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Congressional Budget Fiscal Year 2011 Congressional Budget The Fiscal Year 2011 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy. fy11_budget.pdf (3.02 MB) More Documents & Publications Office of Energy Efficiency and Renewable Energy Overview Appropriation Summary by Program for FY 2011 Congressional Budget CX-005991: Categorical Exclusion Determination Transition Plan

  16. Chizu Task Mapping Tool

    Energy Science and Technology Software Center (OSTI)

    2014-07-01

    Chizu is a tool for Mapping MPI processes or tasks to physical processors or nodes for optimizing communication performance. It takes the communication graph of a High Performance Computing (HPC) application and the interconnection topology of a supercomputer as input. It outputs a new MPI rand to processor mapping, which can be used when launching the HPC application.

  17. Waste management fiscal year 1998 progress report

    SciTech Connect (OSTI)

    1998-12-31

    The Waste Management Program is pleased to issue the Fiscal Year 1998 Progress Report presenting program highlights and major accomplishments of the last year. This year-end update describes the current initiatives in waste management and the progress DOE has made toward their goals and objectives, including the results of the waste management annual performance commitments. One of the most important program efforts continues to be opening the Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, for the deep geologic disposal of transuranic waste. A major success was achieved this year by the West Valley Demonstration Project in New York, which in June completed the project`s production phase of high-level waste processing ahead of schedule and under budget. Another significant accomplishment this year was the award of two privatization contracts for major waste management operations, one at Oak ridge for transuranic waste treatment, and one at Hanford for the Tank Waste Remediation System privatization project. DOE is proud of the progress that has been made, and will continue to pursue program activities that allow it to safely and expeditiously dispose of radioactive and hazardous wastes across the complex, while reducing worker, public, and environmental risks.

  18. Multiple-Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders

    Energy Savers [EERE]

    Manufactured Housing - Building America Top Innovation | Department of Energy Moisture and Ventilation Solutions in Hot, Humid Climates: Florida Manufactured Housing - Building America Top Innovation Moisture and Ventilation Solutions in Hot, Humid Climates: Florida Manufactured Housing - Building America Top Innovation Photo of workers on the roof of a home. This Top Innovation profile describes research by Building America Partnership for Improved Residential Construction team to diagnose

  19. DOE OIG Strategic Plan Fiscal Years 2003-2008 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-2008 DOE OIG Strategic Plan Fiscal Years 2003-2008 U.S. Department of Energy Office of Inspector General, Strategic Plan, Fiscal Years 2003-2008 "Promoting Positive Change in ...

  20. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric ...

  1. Fiscal year 1997 Memorandum of Understanding for the TWRS characterization project

    SciTech Connect (OSTI)

    Schreiber, R.D., Fluor Daniel Hanford

    1997-02-27

    During fiscal year 1997, the level of success achieved by the Tank Waste Remediation System (TWRS) shall be determined by specific performance measures. These measures take the form of significant deliverables, one of which is the completion of Tank Characterization Reports (TCRs). In order to achieve success regarding the TCR performance deliverable, multiple organizations across TWRS must work together. Therefore, the requirements and expectations needed from each of these TWRS organizations were examined in order to gain an understanding of the performance necessary from each organization to achieve the end deliverable. This memorandum of understanding (MOU) documents the results of this review and establishes the performance criteria by which TWRS will assess its progress and success. These criteria have been determined based upon a TWRS Characterization Project budget of $56.8 million for fiscal year 1997; if this budget is changed or the currently identified workscope is modified, this MOU will need to be revised accordingly. This MOU is subdivided into six sections, where sections three through six each identify individual interfaces between TWRS organizations. The specific performance criteria related to each TWRS organizational interface are then delineated in the section, along with any additional goals or issues pertaining to that interface.

  2. Fiscal year 1998 memorandum of understanding for the TWRS characterization project

    SciTech Connect (OSTI)

    Schreiber, R.D.

    1998-03-24

    During fiscal year 1998, the level of success achieved by the Tank Waste Remediation System (TWRS) shall be determined by specific performance measures. These measures take the form of significant deliverables, one of which is the completion of Tank Characterization Reports (TCRs). In order to achieve success regarding the TCR performance deliverable, multiple organizations across TWRS must work together. Therefore, the requirements and expectations needed from each of these TWRS organizations were examined in order to gain an understanding of the performance necessary from each organization to achieve the end deliverable. This memorandum of understanding (MOU) documents the results of this review and establishes the performance criteria by which TWRS will assess its progress and success. These criteria have been determined based upon a TWRS Characterization Project budget of $47.5 million for fiscal year 1998; if this budget is changed or the currently identified work scope is modified, this MOU will need to be revised accordingly. This MOU is subdivided into six sections, where sections three through six each identify individual interfaces between TWRS organizations. The specific performance criteria related to each TWRS organizational interface are then delineated in the section, along with any additional goals or issues pertaining to that interface.

  3. Fiscal Year 1999 memorandum of understanding for the TWRS characterization project

    SciTech Connect (OSTI)

    HUNT, J.W.

    1998-11-11

    During fiscal year 1999, the level of success achieved by the Tank Waste Remediation System (TWRS) shall be determined by specific performance measures. These measures take the form of significant deliverables, one of which is the completion of Tank Characterization Reports (TCRS). In order to achieve success regarding the TCR performance deliverable, multiple organizations across TWRS must work together. Therefore, the requirements and expectations needed from each of these TWRS organizations were examined in order to gain an understanding of the performance necessary from each organization to achieve the end deliverable. This memorandum of understanding (MOU) documents the results of this review and establishes the performance criteria by which TWRS will assess its progress and success. These criteria have been determined based upon a TWRS Characterization Project budget of $42.1 million for fiscal year 1999; if this budget is changed or the currently identified workscope is modified, this MOU will need to be revised accordingly. This MOU is subdivided into six sections, where sections three through six each identify individual interfaces between TWRS organizations. The specific performance criteria related to each TWRS organizational interface are then delineated in the section, along with any additional goals or issues pertaining to that interface.

  4. DOE OIG Strategic Plan Fiscal Years 2014 - 2019 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14 - 2019 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 U.S. Department of Energy Office of Inspector General, Strategic Plan, Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. DOE OIG Strategic PlanFY 2014 - FY 2019.pdf (239.77 KB) More Documents & Publications Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal

  5. Hanford Site groundwater monitoring for Fiscal Year 1997

    SciTech Connect (OSTI)

    Hartman, M.J.; Dresel, P.E.

    1998-02-01

    This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1997 on the Hanford Site, Washington. Soil-vapor extraction continued in the 200-West Area to remove carbon tetrachloride from the vadose zone. Characterization and monitoring of the vadose zone comprised primarily spectral gamma logging, soil-vapor monitoring, and analysis and characterization of sediments sampled below a vadose-zone monitoring well. Source-term analyses for strontium-90 in 100-N Area vadose-zone sediments were performed using recent groundwater-monitoring data and knowledge of strontium`s ion-exchange properties. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1996 and June 1997. Water levels near the Columbia River increased during this period because the river stage was unusually high. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-1,2-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level.

  6. Technical and management support for the development of Small Wind Systems. Fiscal year 1980 annual report, October 1, 1979-September 30, 1980

    SciTech Connect (OSTI)

    Not Available

    1981-08-01

    The status and achievements of a program for the development, testing, and commercialization of wind energy systems rated under 100 kilowatts are described. The organization structure and task definition used to promote the production, marketing, and acceptance of small systems are described, and the Work Breakdown Structure under which the program is organized is detailed. Reports are given which describe the status of contracts funded by the Federal Wind Energy Program and managed by the Rocky Flats Wind Systems Program. These project reports, sequenced according to the Department of Energy Work Breakdown Structure, name the principal investigators involved, and discuss achievements and progress made during Fiscal Year 1980. Of fourty-four projects, seven were completed during the Fiscal Year. The Work Breakdown Structure Index details the organization sequence.

  7. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 Work Plan Working draft - reflects comments received from PIC, HSEP, TWC and RAP committees (updated October 22, 2015) 1 Hanford Advisory Board Draft Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area

  8. FOIA Backlog Reduction Goals, fiscal years 2008,2009 and 2010. | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Backlog Reduction Goals, fiscal years 2008,2009 and 2010. FOIA Backlog Reduction Goals, fiscal years 2008,2009 and 2010. FOIA Backlog Reduction Goals with respect to the numbers of FOIA requests and administrative appeals to be processed for the next three fiscal years as well as the number of requests and number of appeals it expects to be pending beyond the statutory time period at the end of each fiscal year for Fiscal Years 2008, 2009, and 2010. FOIA Backlog Reduction Goals,

  9. EM Rolls Out Fiscal Year 2014 Budget Request

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Today EM Senior Advisor David Huizenga rolled out a $5.622 billion budget request for fiscal year 2014 that enables EM progress in all areas of the nuclear cleanup program while maintaining safety and compliance across the complex.

  10. EERE Fiscal Year 2017 Budget Webinar- Renewable Power

    Broader source: Energy.gov [DOE]

    Join the Office of Energy Efficiency and Renewable Energy (EERE) for a webinar hosted by Deputy Assistant Secretary for Renewable Power Doug Hollett to learn about EERE's fiscal year 2017 budget request. Deputy Assistant Secretary Hollett will be joined by José Zayas, Wind & Water Technologies Office Director; Lidija Sekaric, Solar Technologies Office Acting Director; and Sue Hamm, Geothermal Technologies Office Acting Director.

  11. Hanford Site Groundwater Monitoring for Fiscal Year 2002

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2003-02-28

    This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2002 on the U.S. Department of Energy's Hanford Site in Washington State. This report is written to meet the requirements in CERCLA, RCRA, the Atomic Energy Act of 1954, and Washington State Administrative Code.

  12. Webtrends Archives by Fiscal Year - Lose Your Excuse | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Lose Your Excuse sites by fiscal year. Lose Your Excuse FY09 (2.42 MB) Lose Your Excuse FY10 (2.57 MB) Lose Your Excuse FY11 (2.52 MB) Lose Your Excuse Parents FY09 (1.48 MB) Lose ...

  13. Ocean thermal energy conversion: report to congress - fiscal year 1982

    SciTech Connect (OSTI)

    Not Available

    1983-03-31

    National Oceanic and Atmospheric Administration (NOAA) activities related to ocean thermal energy conversion (OTEC) during fiscal year 1982 are described. The agency focus has been in the areas of providing ocean engineering and technical assistance to the Department of Energy (DOE), in streamlining the administration of the Federal OTEC licensing system, and in environmental assistance.

  14. Ecological Monitoring and Compliance Program Fiscal Year 2003 Report

    SciTech Connect (OSTI)

    Bechtel Nevada

    2003-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2003.

  15. Aquifer Sampling Tube Results for Fiscal Year 2003

    SciTech Connect (OSTI)

    Hartman, Mary J.; Peterson, Robert E.

    2003-10-27

    This report presents and discusses results of the fiscal year 2003 sampling event associated with aquifer tubes along the Columbia River in the northern Hanford Site. Aquifer tube data help define the extent of groundwater contamination near the river, determine vertical variations in contamination, monitor the performance of interim remedial actions near the river, and support impact studies.

  16. Office of Indian Energy Fiscal Year 2017 Budget Request

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs is proposing a Fiscal Year (FY) 2017 budget of nearly $23 million, or an increase of $7 million from the FY 2016 budget of $16 million.

  17. EM Rolls Out Fiscal Year 2017 Budget Request

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Today, EM rolled out a $6.1 billion budget request for fiscal year 2017. The request will provide the resources to maintain a safe and secure posture in the EM complex, and to continue moving forward with the country’s largest nuclear cleanup.

  18. Sandia Energy - IEA PVPS Task 13 Activities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IEA PVPS Task 13 Activities Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Modeling & Analysis IEA PVPS Task 13 Activities IEA PVPS Task 13...

  19. Army Energy Initiatives Task Force

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers the Army Energy Initiatives Task Force.

  20. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    SciTech Connect (OSTI)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  1. Laboratory directed research development annual report. Fiscal year 1996

    SciTech Connect (OSTI)

    1997-05-01

    This document comprises Pacific Northwest National Laboratory`s report for Fiscal Year 1996 on research and development programs. The document contains 161 project summaries in 16 areas of research and development. The 16 areas of research and development reported on are: atmospheric sciences, biotechnology, chemical instrumentation and analysis, computer and information science, ecological science, electronics and sensors, health protection and dosimetry, hydrological and geologic sciences, marine sciences, materials science and engineering, molecular science, process science and engineering, risk and safety analysis, socio-technical systems analysis, statistics and applied mathematics, and thermal and energy systems. In addition, this report provides an overview of the research and development program, program management, program funding, and Fiscal Year 1997 projects.

  2. Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit OAS-FS-15-05 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 17, 2014 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Federal Energy Regulatory

  3. Fiscal Year 2014 - Conference Reporting Activities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 - Conference Reporting Activities Fiscal Year 2014 - Conference Reporting Activities Conference Management Reporting and Spending - FY 2014 The Office of Management and Budget (OMB), on May 11, 2012, issued a memorandum to all agencies that contained steps to improve operations, increase efficiency, and cut unnecessary spending. Consistent with this guidance, the Department of Energy (DOE) is taking aggressive steps to ensure that conference-related expenses are appropriate, necessary and

  4. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2015 Work Plan-Facilitator notes on midyear status for TWC-lead topics (10/22/15) Page 1 of 3 Topic Committee Assignment Potential FY 2015 Action/Product Context 6-Month Status (IM, Committee, Advice, Deferred, No Action) 6. Safety Culture Improvement Efforts TWC Informational Improvement actions in response to the June 2014 follow-up Assessment of Safety Culture - focusing on Office of River Protection (ORP) and the Waste Treatment and Immobilization Plant (WTP). Report anticipated

  5. Federal Geothermal Research Program Update - Fiscal Year 2001

    SciTech Connect (OSTI)

    Laney, P.T.

    2002-08-31

    This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2001. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  6. EERE's Fiscal Year 2004 Budget in Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Budget in Brief EERE's Fiscal Year 2004 Budget in Brief This document provides an overview of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy's FY 2004 budget request to Congress. fy04_budget_in_brief.pdf (840.39 KB) More Documents & Publications The FY 2006 Budget Request The Non-Petroleum Based Fuel Initiative - NPBF The Pathway to Energy Security

  7. TASK 2: QUENCH ZONE SIMULATION

    SciTech Connect (OSTI)

    Fusselman, Steve

    2015-09-30

    Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. A key feature of the AR gasifier design is the transition from the gasifier outlet into the quench zone, where the raw syngas is cooled to ~ 400°C by injection and vaporization of atomized water. Earlier pilot plant testing revealed a propensity for the original gasifier outlet design to accumulate slag in the outlet, leading to erratic syngas flow from the outlet. Subsequent design modifications successfully resolved this issue in the pilot plant gasifier. In order to gain greater insight into the physical phenomena occurring within this zone, AR developed a cold flow simulation apparatus with Coanda Research & Development with a high degree of similitude to hot fire conditions with the pilot scale gasifier design, and capable of accommodating a scaled-down quench zone for a demonstration-scale gasifier. The objective of this task was to validate similitude of the cold flow simulation model by comparison of pilot-scale outlet design performance, and to assess demonstration scale gasifier design feasibility from testing of a scaled-down outlet design. Test results did exhibit a strong correspondence with the two pilot scale outlet designs, indicating credible similitude for the cold flow simulation device. Testing of the scaled-down outlet revealed important considerations in the design and operation of the demonstration scale gasifier, in particular pertaining to the relative momentum between the downcoming raw syngas and the sprayed quench water and associated impacts on flow patterns within the quench zone. This report describes key findings from the test program, including assessment of pilot plant configuration simulations relative to actual

  8. Hanford Site Groundwater Monitoring for Fiscal Year 2000

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2001-03-01

    This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2000 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath each of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. RCRA groundwater monitoring continued during fiscal year 2000. Vadose zone monitoring, characterization, remediation, and several technical demonstrations were conducted in fiscal year 2000. Soil gas monitoring at the 618-11 burial ground provided a preliminary indication of the location of tritium in the vadose zone and in groundwater. Groundwater modeling efforts focused on 1) identifying and characterizing major uncertainties in the current conceptual model and 2) performing a transient inverse calibration of the existing site-wide model. Specific model applications were conducted in support of the Hanford Site carbon tetrachloride Innovative Treatment Remediation Technology; to support the performance assessment of the Immobilized Low-Activity Waste Disposal Facility; and in development of the System Assessment Capability, which is intended to predict cumulative site-wide effects from all significant Hanford Site contaminants.

  9. Small business report to Congress for fiscal year 1992

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report describes the various programs of the Office of Small and Disadvantaged Business Utilization designed to ensure small businesses have an equitable opportunity to do business with the Department of Energy. In addition, this report covers 33 organizational components of the Department and details the extent to which small business firms are participating in the procurement process as well as efforts taken to ensure continued involvement. During fiscal year 1992, the Department met or exceeded its percentage and dollar goals for 8(a) concerns, labor surplus area set-asides, and for-subcontracting to small businesses. The Department`s contract awards to small businesses totaled $3.1 billion (17.3 percent of the 18.1 billion the Department spent on contracts), which consisted of Departmental prime contracts and management and operating contracts. During fiscal year 1992, the Department awarded contracts totaling $307 million to small disadvantaged businesses under Section 8(a) of the U.S. Small Business Act. This total represents 1.7 percent of all prime contracts over $25,000 awarded by the Department during that period. The Department and its management and operating contractors awards to women-owned businesses and labor surplus area set-asides totaled $327 million and $596 million, respectively. The achievements in small business subcontracting for fiscal year 1992 was $234 million, including $23 million to small disadvantaged firms.

  10. EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008 Los Alamos Site-Wide Environmental Impact Statement | Department of Energy Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement EIS-0380: Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement Fiscal Year 2011 Mitigation Action Plan Annual Report for the 2008 Los Alamos Site-Wide Environmental Impact Statement This Annual Report summarizes the activities that

  11. Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 9 Annual Performance Results and FY 2010 Annual Performance Plan Combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2009 Annual Performance Results and FY 2010 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2009 actual performance and FY 2010 planned activities. Combined Fiscal

  12. Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 0 Annual Performance Results and FY 2011 Annual Performance Plan Combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2010 Annual Performance Results and FY 2011 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2010 actual performance and FY 2011 planned activities. Combined Fiscal

  13. Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Performance Plan | Department of Energy 1 Annual Performance Results and FY 2012 Annual Performance Plan Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities. Combined Fiscal

  14. Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rollout - Energy Saving Homes, Buildings, and Manufacturing | Department of Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and Manufacturing Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and Manufacturing Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and Manufacturing, May 2013. buildings_stakeholder_pres_0513.pdf (1.42 MB) More

  15. 2012-01 "Fiscal Year 2014 Budget Request for LANL Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget) Memorandum for distribution, Fiscal Years 2014 through 2018 Initial Budget Formulation "Kick off", dated March 12, 2012. PDF icon Rec 2012-01 - March 12, 2012 More ...

  16. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  17. 300 Area D4 Project Fiscal Year 2010 Building Completion Report

    SciTech Connect (OSTI)

    Skwarek, B. J.

    2011-01-27

    This report summarizes the deactiviation, decontamination, decommissioning, and demolition activities of facilities in the 300 Area of the Hanford Site in fiscal year 2010.

  18. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3

    SciTech Connect (OSTI)

    Turner, J.W.

    1993-12-01

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.

  19. Hanford Site Groundwater Monitoring for Fiscal Year 1998

    SciTech Connect (OSTI)

    Hartman, M.J.

    1999-03-24

    This report presents the results of groundwater and vadose-zone monitoring and remediation for fiscal year (FY) 1998 on the Word Site, Washington. Soil-vapor extraction in the 200-West Area removed 777 kg of carbon tetrachloride in FY 1998, for a total of 75,490 kg removed since remediation began in 1992. Spectral gamma logging and evaluation of historical gross gamma logs near tank farms and liquid-disposal sites in the 200 Areas provided information on movement of contaminants in the vadose zone. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1997 and June 1998. The most widespread radiological contaminant plumes in groundwater were tritium and iodine-129. Concentrations of technetium-99, uranium, strontium-90, and carbon-14 also exceeded drinking water standards in smaller plumes. Plutonium and cesium-137 exceeded standards only near the 216-B-5 injection well. Derived concentration guide levels specified in U.S. Department of Energy Order 5400.5 were exceeded for tritium, uranium, strontium-90, and plutonium in small plumes or single wells. One well completed in the basalt-confined aquifer beneath the 200-East Area exceeded the drinking water standard for technetium-99. Nitrate is the most extensive chemical contaminant. Carbon tetrachloride, chloroform, chromium, cis-l, Z-dichloroethylene, fluoride, and trichloroethylene also were present in smaller areas at levels above their maximum contaminant levels. Cyanide concentrations were elevated in one area but were below the maximum contaminant level. Tetrachloroethylene exceeded its maximum contaminant level in several wells in the 300 Area for the first time since the 1980s. Metals such as aluminum, cadmium, iron, manganese, and nickel exceeded their maximum contaminant levels in filtered samples from numerous

  20. Fiscal Year 2013 Department of Energy Annual Occupational Safety and Health Report for Federal Employees to the Secretary of Labor

    Broader source: Energy.gov [DOE]

    Fiscal Year 2013 Department of Energy Annual Occupational Safety and Health Report for Federal Employees to the Secretary of Labor.

  1. NREL Job Task Analysis: Quality Control Inspector

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Task 1: Maintain professional credentials Task 2: Confirm the allocation of ... * Conduct random sampling of worker credentials * Observe the workers * Interview the ...

  2. Nuclear Radiological Threat Task Force Established | National...

    National Nuclear Security Administration (NNSA)

    Nuclear Radiological Threat Task Force Established Washington, DC NNSA's Administrator Linton Brooks announces the establishment of the Nuclear Radiological Threat Reduction Task ...

  3. Forecast of contracting and subcontracting opportunities. Fiscal year 1996

    SciTech Connect (OSTI)

    1996-02-01

    This forecast of prime and subcontracting opportunities with the U.S. Department of Energy and its MAO contractors and environmental restoration and waste management contractors, is the Department`s best estimate of small, small disadvantaged and women-owned small business procurement opportunities for fiscal year 1996. The information contained in the forecast is published in accordance with Public Law 100-656. It is not an invitation for bids, a request for proposals, or a commitment by DOE to purchase products or services. Each procurement opportunity is based on the best information available at the time of publication and may be revised or cancelled.

  4. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    SciTech Connect (OSTI)

    Bechtel Nevada Ecological Services

    1998-10-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

  5. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 05.18.16 *Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Advice [X] 2. Critical Infrastructure Updates *RAP/HSEP/TWC Advice [X] 3. PFP Progress *RAP/HSEP Agency briefing X 4. Sludge retrieval RAP Agency briefing X 5. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [X] 6. Risk-based retrieval,

  6. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 24, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Informational x x 2. 100 D/H Proposed Plan RAP Informational x x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. 324 Waste Sites RAP Informational 5. 618-10 VPU remediation RAP Informational 6. Central Plateau Inner Area Guidelines RAP Informational x 7. ERDF RAP

  7. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adopted by the Hanford Advisory Board on 11/5/2015, updated 12/21/15 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview and RAP Issue Manager Assignments) Topic Committee Assignment Issue Managers (lead noted in bold) Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Mattson, Suyama x 2. 100 D/H Proposed Plan RAP Engstrom, Mattson, Garnant, Leckband x 3. 100-N Proposed Plan RAP Cimon, Mattson x 4. Central Plateau Inner Area Guidelines RAP Cimon, Catrell,

  8. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2015June 18, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  9. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated December 21, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  10. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 8/31/2016 * Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Agency briefing, advice [x] 2. Sludge retrieval RAP Agency briefing x x 3. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [x] 4. River Corridor updates RAP Agency briefing 5. Groundwater updates RAP Agency briefing x x x x 6. Central

  11. Geothermal Injection Technology Program: Annual progress report, Fiscal Year 1986

    SciTech Connect (OSTI)

    Not Available

    1987-07-01

    This report summarizes the Geothermal Injection Technology Program major activities in fiscal year 1986. The Idaho Engineering Laboratory (INEL) and the University of Utah Research Institute (UURI) have been conducting injection research and testing for this program, which was initiated in 1983. Activities at the INEL, representative element nodeling of fracture systems based on stochastic analysis, dual permeability modeling of flow in a fractured geothermal reservoir, and dual permeability model - laboratory and FRACSL-validation studies, are presented first, followed by the University of Utah Research Institute tracer development - experimental studies, which includes a brief description of activities planned for FY-1987.

  12. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  13. Task

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Noise exposure d) Application of cold coal tar coating to asphalt * Dermal contact ... up of high concentrations of carbon monoxide gas CO andor other by-products of combustion. ...

  14. Task

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IH Activity/Hazard Table - Does not include all construction activities. Review the rules of use on Page 1 before determining the applicable controls required for your work. 1/4/2016 REV 10 1 Rules for the use of this table 1. DO NOT just copy from the table without modifying the hazards and control sets to the specific scope of work, means and methods of how work will be performed, applying the requirements of approved CSSPs, and duration, frequency, location, and extent of work to be

  15. Task Group 9 Update (Presentation)

    SciTech Connect (OSTI)

    Bosco, N.

    2014-04-01

    This presentation is a brief update of IEC TC82 QA Task Force, Group 9. Presented is an outline of the recently submitted New Work Item Proposal (NWIP) for a Comparative Thermal Cycling Test for CPV Modules to Differentiate Thermal Fatigue Durability.

  16. FAQS Job Task Analyses- Radiation Protection

    Office of Energy Efficiency and Renewable Energy (EERE)

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  17. FAQS Job Task Analyses- Environmental Restoration

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  18. FAQS Job Task Analyses- Nuclear Safety Specialist

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  19. FAQS Job Task Analyses- Facility Representative

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  20. FAQS Job Task Analyses- Technical Program Manager

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  1. FAQS Job Task Analyses- General Technical Base

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  2. FAQS Job Task Analyses- Quality Assurance

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  3. FAQS Job Task Analyses- Weapons Quality Assurance

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  4. FAQS Job Task Analyses- Environmental Compliance

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  5. FAQS Job Task Analyses- Deactivation and Decommissioning

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  6. FAQS Job Task Analyses- Occupational Safety

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  7. FAQS Job Task Analyses- Emergency Management

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  8. FAQS Job Task Analyses- Technical Training

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  9. FAQS Job Task Analyses- DOE Aviation Manager

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  10. Functional Area Qualification Standard Job Task Analyses

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  11. FAQS Job Task Analyses- Safeguards and Security

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  12. FAQS Job Task Analyses- Chemical Processing

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  13. FAQS Job Task Analyses- Construction Management

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  14. FAQS Job Task Analyses- Industrial Hygiene

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  15. FAQS Job Task Analyses- Criticality Safety

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.

  16. Basalt Waste Isolation Project. Annual report, fiscal year 1980

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    During this fiscal year the information available in the fields of geology and hydrology of the Columbia Plateau was consolidated and two reports were issued summarizing this information. In addition, the information on engineered barriers was consolidated and a report summarizing the research to date on waste package development and design of borehole seals was prepared. The waste package studies, when combined with the hydrologic integration, revealed that even under extreme disruptive conditions, a repository in basalt with appropriately designed waste packages can serve as an excellent barrier for containment of radionuclides for the long periods of time required for waste isolation. On July 1, 1980, the first two heater tests at the Near-Surface Test Facility were started and have been successfully operated to this date. The papers on the Near-Surface Test Facility section of this report present the results of the equipment installed and the preliminary results of the testing. In October 1979, the US Department of Energy selected the joint venture of Kaiser Engineers/Parsons Brinckerhoff Quade and Douglas, Inc., to be the architect-engineer to produce a conceptual design of a repository in basalt. During the year, this design has progressed and concept selection has now been completed. This annual report presents a summary of the highlights of the work completed during fiscal year 1980. It is intended to supplement and summarize the nearly 200 papers and reports that have been distributed to date as a part of the Basalt Waste Isolation Project studies.

  17. Hanford Site Groundwater Monitoring for Fiscal Year 2003

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2004-04-12

    This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2003 (October 2002 through September 2003) on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Concentrations of tritium, nitrate, and some other contaminants continued to exceed drinking water standards in groundwater discharging to the river in some locations. However, contaminant concentrations in river water remained low and were far below standards. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the central part of the Hanford Site. Hexavalent chromium is present in smaller plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas, and technetium-99 and uranium are present in the 200 Areas. Uranium exceeds standards in the 300 Area in the south part of the Hanford Site. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the ''Comprehensive Environmental Response, Compensation, and Liability Act'' is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99

  18. Post-Award Deliverables Sample (Part 2 of Sample Deliverables for Task

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Orders, IDIQ Attachment. J-4) | Department of Energy Award Deliverables Sample (Part 2 of Sample Deliverables for Task Orders, IDIQ Attachment. J-4) Post-Award Deliverables Sample (Part 2 of Sample Deliverables for Task Orders, IDIQ Attachment. J-4) Document offers a post-award deliverables sample for an energy savings performance contract. Download part 2 of the post-award deliverables sample document. (33.67 KB) More Documents & Publications Pre-Award Deliverables Sample (Part 1 of

  19. Task Decomposition in Human Reliability Analysis

    SciTech Connect (OSTI)

    Boring, Ronald Laurids; Joe, Jeffrey Clark

    2014-06-01

    In the probabilistic safety assessments (PSAs) used in the nuclear industry, human failure events (HFEs) are determined as a subset of hardware failures, namely those hardware failures that could be triggered by human action or inaction. This approach is top-down, starting with hardware faults and deducing human contributions to those faults. Elsewhere, more traditionally human factors driven approaches would tend to look at opportunities for human errors first in a task analysis and then identify which of those errors is risk significant. The intersection of top-down and bottom-up approaches to defining HFEs has not been carefully studied. Ideally, both approaches should arrive at the same set of HFEs. This question remains central as human reliability analysis (HRA) methods are generalized to new domains like oil and gas. The HFEs used in nuclear PSAs tend to be top-down— defined as a subset of the PSA—whereas the HFEs used in petroleum quantitative risk assessments (QRAs) are more likely to be bottom-up—derived from a task analysis conducted by human factors experts. The marriage of these approaches is necessary in order to ensure that HRA methods developed for top-down HFEs are also sufficient for bottom-up applications.

  20. Fuel oil quality task force

    SciTech Connect (OSTI)

    Laisy, J.; Turk, V.

    1997-09-01

    In April, 1996, the R.W. Beckett Corporation became aware of a series of apparently unrelated symptoms that made the leadership of the company concerned that there could be a fuel oil quality problem. A task force of company employees and industry consultants was convened to address the topic of current No. 2 heating oil quality and its effect on burner performance. The task force studied changes in fuel oil specifications and trends in properties that have occurred over the past few years. Experiments were performed at Beckett and Brookhaven National Laboratory to understand the effect of changes in some fuel oil properties. Studies by other groups were reviewed, and field installations were inspected to gain information about the performance of fuel oil that is currently being used in the U.S. and Canada. There was a special concern about the use of red dye in heating oils and the impact of sulfur levels due to the October, 1993 requirement of low sulfur (<0.05%) for on-highway diesel fuel. The results of the task force`s efforts were published in July, 1996. The primary conclusion of the task force was that there is not a crisis or widespread general problem with fuel oil quality. Localized problems that were seen may have been related to refinery practices and/or non-traditional fuel sources. System cleanliness is very important and the cause of many oil burner system problems. Finally, heating oil quality should get ongoing careful attention by Beckett engineering personnel and heating oil industry groups.

  1. Hanford Site Groundwater Monitoring for Fiscal Year 2005

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2006-02-28

    This report is one of the major products and deliverables of the Groundwater Remediation and Closure Assessment Projects detailed work plan for FY 2006, and reflects the requirements of The Groundwater Performance Assessment Project Quality Assurance Plan (PNNL-15014). This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2005 on the U.S. Department of Energy's Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the west-central part of the Hanford Site. Hexavalent chromium is present in plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas. Technetium-99 and uranium plumes exceeding standards are present in the 200 Areas. A uranium plume underlies the 300 Area. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the Columbia River. The objective of two interim remediation systems in the 200 West Area is to prevent the spread of carbon tetrachloride and technetium-99/uranium plumes. Resource Conservation and

  2. National Defense Authorization Act for Fiscal Year 1993 (PL 102-484) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Defense Authorization Act for Fiscal Year 1993 (PL 102-484) National Defense Authorization Act for Fiscal Year 1993 (PL 102-484) Section 3162 of the National Defense Authorization Act for Fiscal Year 1993 (Public Law 102-484) called for the Secretary to establish and carry out a program for the identification and on-going medical evaluation of its former employees who are subject to significant health risks as a result of the exposure of such employees to

  3. GreenBuy Award Winners Listed by Fiscal Year | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GreenBuy Award Winners Listed by Fiscal Year GreenBuy Award Winners Listed by Fiscal Year The Department of Energy's (DOE) Office of Environment, Health, Safety and Security has announced the winners of the Fiscal Year (FY) 2015 GreenBuy Awards.The Office of Sustainability Support (AU-21), in coordination with the Office Management and Administration's Office of Acquisition and Project Management, launched the GreenBuy Awards in FY 2011.The award program recognizes DOE sites for excellence in

  4. DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOE/OE NSTB program's research and development (R&D) of advance security tools and to heighten awareness among energy sector partners of the more than 30 NSTB projects underway in FY2009. DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (260.95 KB) More Documents & Publications National SCADA Test

  5. EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014

    SciTech Connect (OSTI)

    Bush, Shane

    2014-09-01

    This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.

  6. Federal Geothermal Research Program Update Fiscal Year 1999

    SciTech Connect (OSTI)

    Not Available

    2004-02-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal and Wind Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office of Geothermal and Wind Technologies. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 1999. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal and Wind Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy.

  7. Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2000

    SciTech Connect (OSTI)

    Spane, Frank A.; Thorne, Paul D.; Newcomer, Darrell R.

    2001-05-15

    This report provides the resluts of detailed hydrologic characterization tests conducted within eleven Hanford Site wells during fiscal year 2000. Detailed characterization tests performed included groundwater-flow characterization; barometric response evaluation; slug tests; single-well tracer tests; constant-rate pumping tests; and in-well, vertical flow tests. Hydraulic property estimates obtained from the detailed hydrologic tests include transmissivity; hydraulic conductivity; specific yield; effective porosity; in-well, lateral flow velocity; aquifer-flow velocity; vertical distribution of hydraulic conductivity (within the well-screen section); and in-well, verticla flow velocity. In addition, local groundwater-flow characteristics (i.e., hydraulic gradient and flow direction) were determined for four sites where detailed well testing was performed.

  8. Federal Geothermal Research Program Update Fiscal Year 1998

    SciTech Connect (OSTI)

    Keller, J.G.

    1999-05-01

    This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

  9. Summary of Hanford Site Groundwater Monitoring for Fiscal Year 2005

    SciTech Connect (OSTI)

    Hartman, Mary J.; Morasch, Launa F.; Webber, William D.

    2006-03-01

    This is a summary booklet of the main report: Hanford Site Groundwater Monitoring for Fiscal Year 2005. It is the summary section of the main report with a CD of the entire report included. The main report is one of the major products and deliverables of the Groundwater Remediation and Closure Assessment Projects detailed work plan for FY 2006, and reflects the requirements of The Groundwater Performance Assessment Project Quality Assurance Plan (PNNL-15014). This report presents the results of groundwater and vadose zone monitoring and remediation for fiscal year 2005 on the U.S. Department of Energys Hanford Site, Washington. The most extensive contaminant plumes in groundwater are tritium, iodine-129, and nitrate, which all had multiple sources and are very mobile in groundwater. The largest portions of these plumes are migrating from the central Hanford Site to the southeast, toward the Columbia River. Carbon tetrachloride and associated organic constituents form a relatively large plume beneath the west-central part of the Hanford Site. Hexavalent chromium is present in plumes beneath the reactor areas along the river and beneath the central part of the site. Strontium-90 exceeds standards beneath all but one of the reactor areas. Technetium-99 and uranium plumes exceeding standards are present in the 200 Areas. A uranium plume underlies the 300 Area. Minor contaminant plumes with concentrations greater than standards include carbon-14, cesium-137, cis-1,2-dichloroethene, cyanide, fluoride, plutonium, and trichloroethene. Monitoring for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 is conducted in 11 groundwater operable units. The purpose of this monitoring is to define and track plumes and to monitor the effectiveness of interim remedial actions. Interim groundwater remediation in the 100 Areas continued with the goal of reducing the amount of chromium (100-K, 100-D, and 100-H) and strontium-90 (100-N) reaching the

  10. Nuclear Test-Experimental Science: Annual report, fiscal year 1988

    SciTech Connect (OSTI)

    Struble, G.L.; Donohue, M.L.; Bucciarelli, G.; Hymer, J.D.; Kirvel, R.D.; Middleton, C.; Prono, J.; Reid, S.; Strack, B.

    1988-01-01

    Fiscal year 1988 has been a significant, rewarding, and exciting period for Lawrence Livermore National Laboratory's nuclear testing program. It was significant in that the Laboratory's new director chose to focus strongly on the program's activities and to commit to a revitalized emphasis on testing and the experimental science that underlies it. It was rewarding in that revolutionary new measurement techniques were fielded on recent important and highly complicated underground nuclear tests with truly incredible results. And it was exciting in that the sophisticated and fundamental problems of weapons science that are now being addressed experimentally are yielding new challenges and understanding in ways that stimulate and reward the brightest and best of scientists. During FY88 the program was reorganized to emphasize our commitment to experimental science. The name of the program was changed to reflect this commitment, becoming the Nuclear Test-Experimental Science (NTES) Program.

  11. Office of Inspector General fiscal year 1996 annual work plan

    SciTech Connect (OSTI)

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  12. Polymers with increased order

    DOE Patents [OSTI]

    Sawan, Samuel P.; Talhi, Abdelhafid; Taylor, Craig M.

    1998-08-25

    The invention features polymers with increased order, and methods of making them featuring a dense gas.

  13. Implementing Executive Order 13423

    Broader source: Energy.gov [DOE]

    Guide describes the instructions on the requirements and how fleets should implement the Executive Order 13423.

  14. Battelle Energy Alliance, LLC, Continuity Readiness Assurance Report — Fiscal Year 2015

    SciTech Connect (OSTI)

    Anderson, Daniel Roland

    2015-09-01

    This is a report generated for DOE-ID to summarize accomplishments made by the BEA Continuity of Operations program as a part of BEA Emergency Management at the INL during the past fiscal year.

  15. Purchasing and Materials Management Organization, Sandia National Laboratories annual report, fiscal year 1993

    SciTech Connect (OSTI)

    Martin, D.R.

    1994-02-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1993. Activities for both the New Mexico and California locations are included.

  16. Deep Vadose Zone–Applied Field Research Initiative Fiscal Year 2012 Annual Report

    SciTech Connect (OSTI)

    Wellman, Dawn M.; Truex, Michael J.; Johnson, Timothy C.; Bunn, Amoret L.; Golovich, Elizabeth C.

    2013-03-14

    This annual report describes the background of the Deep Vadose Zone-Applied Field Research Initiative, and some of the programmatic approaches and transformational technologies in groundwater and deep vadose zone remediation developed during fiscal year 2012.

  17. Deployment summary: Fiscal years 1995-2000 [USDOE Office of International Programs

    SciTech Connect (OSTI)

    2000-07-01

    This publication summarizes the progress made by the Office of International Programs (IP) in deploying innovative technologies for the environmental remediation of the DOE complex and for sites of its international collaborators for fiscal years 1995 through 2000.

  18. Battelle Energy Alliance, LLC, Continuity Readiness Assurance Report. Fiscal Year 2014

    SciTech Connect (OSTI)

    Stucki, Brandon C.; Campbell, Sherman S.

    2014-09-01

    This is a report generated for DOE-ID to summarize accomplishments made by the BEA Continuity of Operations program as a part of BEA Emergency Management at the INL during the past fiscal year.

  19. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1998

    SciTech Connect (OSTI)

    2000-03-20

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1998.

  20. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997

    SciTech Connect (OSTI)

    1999-08-13

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.

  1. Annual report procurement and logistics management center Sandia National Laboratories fiscal year 2002.

    SciTech Connect (OSTI)

    Palmer, David L.

    2003-05-01

    This report summarizes the purchasing and transportation activities of the Procurement and Logistics Management Center for Fiscal Year 2002. Activities for both the New Mexico and California locations are included.

  2. Fault-tolerant dynamic task graph scheduling

    SciTech Connect (OSTI)

    Kurt, Mehmet C.; Krishnamoorthy, Sriram; Agrawal, Kunal; Agrawal, Gagan

    2014-11-16

    In this paper, we present an approach to fault tolerant execution of dynamic task graphs scheduled using work stealing. In particular, we focus on selective and localized recovery of tasks in the presence of soft faults. We elicit from the user the basic task graph structure in terms of successor and predecessor relationships. The work stealing-based algorithm to schedule such a task graph is augmented to enable recovery when the data and meta-data associated with a task get corrupted. We use this redundancy, and the knowledge of the task graph structure, to selectively recover from faults with low space and time overheads. We show that the fault tolerant design retains the essential properties of the underlying work stealing-based task scheduling algorithm, and that the fault tolerant execution is asymptotically optimal when task re-execution is taken into account. Experimental evaluation demonstrates the low cost of recovery under various fault scenarios.

  3. Compliance Order on Consent

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compliance Order on Consent Compliance Order on Consent The Compliance Order on Consent provides the requirements for environmental cleanup of hazardous constituents for LANL. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email What is the Compliance Order on Consent? The Compliance Order on Consent between the State of New Mexico Environment Department and the United States Department of Energy and Los Alamos National

  4. Assessment of Food Chain Pathway Parameters in Biosphere Models: Annual Progress Report for Fiscal Year 2004

    SciTech Connect (OSTI)

    Napier, Bruce A.; Krupka, Kenneth M.; Fellows, Robert J.; Cataldo, Dominic A.; Valenta, Michelle M.; Gilmore, Tyler J.

    2004-12-02

    This Annual Progress Report describes the work performed and summarizes some of the key observations to date on the U.S. Nuclear Regulatory Commission’s project Assessment of Food Chain Pathway Parameters in Biosphere Models, which was established to assess and evaluate a number of key parameters used in the food-chain models used in performance assessments of radioactive waste disposal facilities. Section 2 of this report describes activities undertaken to collect samples of soils from three regions of the United States, the Southeast, Northwest, and Southwest, and perform analyses to characterize their physical and chemical properties. Section 3 summarizes information gathered regarding agricultural practices and common and unusual crops grown in each of these three areas. Section 4 describes progress in studying radionuclide uptake in several representative crops from the three soil types in controlled laboratory conditions. Section 5 describes a range of international coordination activities undertaken by Project staff in order to support the underlying data needs of the Project. Section 6 provides a very brief summary of the status of the GENII Version 2 computer program, which is a “client” of the types of data being generated by the Project, and for which the Project will be providing training to the US NRC staff in the coming Fiscal Year. Several appendices provide additional supporting information.

  5. National Ignition Facility fires 300th laser target shot of fiscal year

    National Nuclear Security Administration (NNSA)

    2015 | National Nuclear Security Administration | (NNSA) Ignition Facility fires 300th laser target shot of fiscal year 2015 August 18, 2015 WASHINGTON - Last week, the National Ignition Facility (NIF) fired its 300th laser target shot in fiscal year (FY) 2015, meeting the year's goal more than six weeks early. In comparison, the facility completed 191 target shots in FY 2014. Located at Lawrence Livermore National Laboratory (LLNL), the NIF is the world's most energetic laser. Increasing

  6. AUDIT REPORT Department of Energy Nuclear Waste Fund's Fiscal Year 2015 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Nuclear Waste Fund's Fiscal Year 2015 Financial Statement Audit OAI-FS-16-03 December 2015 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 1, 2015 MEMORANDUM FOR THE ACTING DIRECTOR, OFFICE OF STANDARD CONTRACT MANAGEMENT FROM: Rickey R. Hass Acting Inspector General SUBJECT: INFORMATION: Audit Report on "Department of Energy Nuclear Waste Fund's Fiscal Year 2015 Financial Statement Audit"

  7. Direct Federal Financial Interventions and Subsidies in Energy in Fiscal Year 2013

    U.S. Energy Information Administration (EIA) Indexed Site

    Direct Federal Financial Interventions and Subsidies in Energy in Fiscal Year 2013 March 2015 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Direct Federal Financial Interventions and Subsidies in Energy in Fiscal Year 2013 i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses,

  8. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Distribution Programs. | Department of Energy Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development

  9. DOE OIG Strategic Plan Fiscal Years 2009 - 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 - 2013 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 U.S. Department of Energy Office of Inspector General, Strategic Plan, Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. As OIG implements this Strategic Plan, our objective is to continue to play a critical role in protecting and

  10. DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Los Alamos | Department of Energy DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos October 2, 2015 - 2:30am Addthis Cincinnati - The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center announced it intends to solicit by means of full and open competition for a company with the specialized capabilities necessary to successfully

  11. 300 Area D4 Project Fiscal Year 2009 Building Completion Report

    SciTech Connect (OSTI)

    B. J. Skwarek

    2010-01-27

    This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

  12. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Energy Management and Conservation Programs Fiscal Year 2008 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary This letter report on Federal energy management for fiscal year (FY) 2008 provides information on energy consumption in Federal buildings, operations, and vehicles, and documents activities conducted by Federal agencies under:  The energy management and energy consumption reduction

  13. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Energy Management and Conservation Programs Fiscal Year 2009 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary This letter report on Federal energy management for fiscal year (FY) 2009 provides information on energy consumption in Federal buildings, operations, and vehicles, and documents activities conducted by Federal agencies under:  The energy management and energy consumption reduction

  14. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2010 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Department of Energy |March 2014 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2010. This report on Federal energy management for FY 2010 provides information on energy consumption in Federal

  15. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2011 Report to Congress March 2014 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2011. This report on Federal energy management for FY 2011 responds to section 548 of the National Energy Conservation Policy Act (NECPA; Pub. L.

  16. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2012 Report to Congress May 2015 United States Department of Energy Washington, DC 20585 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2012. This report on Federal energy management for FY 2012 provides information on energy consumption in Federal buildings, operations, and vehicles,

  17. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2013 Report to Congress April 2015 United States Department of Energy Washington, DC 20585 1 ii Department of Energy |April 2015 Message from the Assistant Secretary We are enclosing the Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year (FY) 2013. The Federal Government is the largest single energy consumer in the Nation, presenting significant

  18. Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plan | Department of Energy 2 Annual Performance Report and FY 2003 Annual Performance Plan Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2002 actual performance and FY 2003 planned activities. Combined Fiscal Year (FY) 2002 Annual Performance Report and FY 2003 Annual Performance Plan (3.03 MB) More Documents & Publications Annual Performance

  19. Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Annual Performance Plan | Department of Energy 2 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013

  20. Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Annual Performance Plan | Department of Energy 3 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2013 actual performance and FYs 2014

  1. Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2016 Annual Performance Plan | Department of Energy 4 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2014 actual performance and FYs 2015

  2. Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2017 Annual Performance Plan | Department of Energy 5 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Subject: Office of Inspector General's combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2015 actual performance and FYs 2016

  3. Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rollout - Renewable Electricity Generation | Department of Energy Renewable Electricity Generation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Renewable Electricity Generation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Renewable Electricity Generation, May 2013. electricity_stakeholder_pres_0513.pdf (1.86 MB) More Documents & Publications EERE FY 2015 Budget Request Webinar -- Renewable Power EERE FY 2016

  4. Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rollout - Sustainable Transportation | Department of Energy Sustainable Transportation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Sustainable Transportation Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Sustainable Transportation, May 2013. transportation_stakeholder_pres_0513.pdf (1.67 MB) More Documents & Publications 2013 Peer Review Presnentations-Plenaries EERE FY 2016 Budget Overview -- Sustainable

  5. San Joaquin River Up-Stream DO TMDL Project Task 4: MonitoringStudy Interim Task Report #3

    SciTech Connect (OSTI)

    Stringfellow, William; Borglin, Sharon; Dahlgren, Randy; Hanlon,Jeremy; Graham, Justin; Burks, Remie; Hutchinson, Kathleen

    2007-03-30

    The purpose of the Dissolved Oxygen Total Maximum Daily LoadProject (DO TMDLProject) is to provide a comprehensive understanding ofthe sources and fate of oxygen consuming materials in the San JoaquinRiver (SJR) watershed between Channel Point and Lander Avenue (upstreamSJR). When completed, this study will provide the stakeholders anunderstanding of the baseline conditions of the basin, provide input foran allocation decision, and provide the stakeholders with a tool formeasuring the impact of any waterquality management program that may beimplemented as part of the DO TMDL process. Previous studies haveidentified algal biomass as the most significant oxygen-demandingsubstance in the DO TMDL Project study-area between of Channel Point andLander Ave onthe SJR. Other oxygen-demanding substances found in theupstream SJR include ammonia and organic carbon from sources other thanalgae. The DO TMDL Project study-area contains municipalities, dairies,wetlands, cattle ranching, irrigated agriculture, and industries thatcould potentially contribute biochemical oxygen demand (BOD) to the SJR.This study is designed to discriminate between algal BOD and othersources of BOD throughout the entire upstream SJR watershed. Algalbiomass is not a conserved substance, but grows and decays in the SJR;hence, characterization of oxygen-demanding substances in the SJR isinherently complicated and requires an integrated effort of extensivemonitoring, scientific study, and modeling. In order to achieve projectobjectives, project activities were divided into a number of Tasks withspecific goals and objectives. In this report, we present the results ofmonitoring and research conducted under Task 4 of the DO TMDL Project.The major objective of Task 4 is to collect sufficient hydrologic (flow)and water quality (WQ) data to characterize the loading of algae, otheroxygen-demanding materials, and nutrients fromindividual tributaries andsub-watersheds of the upstream SJR between Mossdale and

  6. 2016-03 "Order on Consent" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 "Order on Consent" 2016-03 "Order on Consent" It is the intent of this recommendation to voice the NNMCABs comments and to take advantage of the opportunity to participate in the development of the new Order on Consent, which will formulate the framework for clean-up of legacy waste in and around Los Alamos. Rec 2016-03 - May 18, 2016 (513.21 KB) More Documents & Publications 2016-02 "Fiscal Year 2018 Budget Priorities" 2016-01 "Campaign Approach"

  7. Consent Order public meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Consent Order public meeting Consent Order public meeting WHEN: Apr 28, 2016 5:00 PM - 7:00 PM WHERE: Los Alamos County Council Chambers CATEGORY: Community TYPE: Meeting INTERNAL: Calendar Login Event Description On March 1, 2005, NMED, the Department of Energy (DOE) and the Regents of the University of California entered into the 2005 Consent Order that prescribed fence-to-fence cleanup requirements for the Laboratory. The public comment period on the Consent Order closes May 16, 2016

  8. INEL integrated spent nuclear fuel consolidation task team report

    SciTech Connect (OSTI)

    Henry, R.N.; Clark, J.H.; Chipman, N.A.

    1994-09-12

    This document describes a draft plan and schedule to consolidate spent nuclear fuel (SNF) and special nuclear material (SNW) from aging storage facilities throughout the Idaho National Engineering Laboratory (INEL) to the Idaho Chemical Processing Plant (ICPP) in a safe, cost-effective, and expedient manner. A fully integrated and resource-loaded schedule was developed to achieve consolidation as soon as possible. All of the INEL SNF and SNM management task, projects, and related activities from fiscal year 1994 to the end of the consolidation period are logic-tied and integrated with each other. The schedule and plan are presented to initiate discussion of their implementation, which is expected to generate alternate concepts that can be evaluated using the methodology described in this report. Three perturbations to consolidating SNF as soon as possible are also explored. If the schedule is executed as proposed, the new and on-going consolidation activities will require about 6 years to complete and about $25.3M of additional funding. Reduced annual operating costs are expected to recover the additional investment in about 6.4 years. The total consolidation program as proposed will cost about $66.8M and require about 6 years to recover via reduced operating costs from retired SNF/SNM storage facilities. Detailed schedules and cost estimates for the Test Reactor Area Materials Test Reactor canal transfers are included as an example of the level of detail that is typical of the entire schedule (see Appendix D). The remaining work packages for each of the INEL SNF consolidation transfers are summarized in this document. Detailed cost and resource information is available upon request for any of the SNF consolidation transfers.

  9. Annual Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Clayton, Ray E.; Sweeney, Mark D.; Devary, Joseph L.; Hartshorn, Donald C.

    2010-12-27

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During FY 2010, the Hanford Seismic Network recorded 873 triggers on the seismometer system, which included 259 seismic events in the southeast Washington area and an additional 324 regional and teleseismic events. There were 210 events determined to be local earthquakes relevant to the Hanford Site. One hundred and fifty-five earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this fiscal year were a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al. 2009a, 2009b, 2009c, 2010a, 2010b, and 2010c). Most events were considered minor (coda-length magnitude [Mc] less than 1.0) with the largest event recorded on February 4, 2010 (3.0Mc). The estimated depths of the Wooded Island events are shallow (averaging approximately 1.5 km deep) placing the swarm within the Columbia River Basalt Group. Based upon the last two quarters (Q3 and Q4) data, activity at the Wooded Island

  10. FAQS Job Task Analyses Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Form FAQS Job Task Analyses Form Step 1, Identify and evaluate tasks; Step 2, Identify and evaluate competencies; and Step 3, Evaluate linkage between tasks and competencies. FAQS Job Task Analyses Form (18.57 KB) More Documents & Publications FAQS Job Task Analyses - Emergency Management FAQS Job Task Analyses - Environmental Compliance FAQS Job Task Analyses - Chemical Processing

  11. President Issues Executive Order Aimed at Preparing for the Impacts of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Climate Change; Tribal Leaders to Serve on Task Force | Department of Energy Issues Executive Order Aimed at Preparing for the Impacts of Climate Change; Tribal Leaders to Serve on Task Force President Issues Executive Order Aimed at Preparing for the Impacts of Climate Change; Tribal Leaders to Serve on Task Force November 1, 2013 - 2:52pm Addthis In light of the Intergovernmental Panel on Climate Change's forthcoming 2013 report detailing the latest scientific findings and projections

  12. Fusion Safety Program annual report, fiscal year 1994

    SciTech Connect (OSTI)

    Longhurst, G.R.; Cadwallader, L.C.; Dolan, T.J.; Herring, J.S.; McCarthy, K.A.; Merrill, B.J.; Motloch, C.G.; Petti, D.A.

    1995-03-01

    This report summarizes the major activities of the Fusion Safety Program in fiscal year 1994. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions, including the University of Wisconsin. The technical areas covered in this report include tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate data base development, and thermalhydraulics code development and their application to fusion safety issues. Much of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and of the technical support for commercial fusion facility conceptual design studies. A major activity this year has been work to develop a DOE Technical Standard for the safety of fusion test facilities.

  13. Fiscal year 1999 Battelle performance evaluation and fee agreement

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  14. Federal Geothermal Research Program Update Fiscal Year 2002

    SciTech Connect (OSTI)

    Not Available

    2003-09-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The goals are: (1) Double the number of States with geothermal electric power facilities to eight by 2006; (2) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the specific objectives, status, and accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2002. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  15. Federal Geothermal Research Program Update Fiscal Year 2003

    SciTech Connect (OSTI)

    Not Available

    2004-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. To develop the technology needed to harness the Nation's vast geothermal resources, DOE's Office of Geothermal Technologies oversees a network of national laboratories, industrial contractors, universities, and their subcontractors. The following mission and goal statements guide the overall activities of the Office. The goals are: (1) Reduce the levelized cost of generating geothermal power to 3-5 cents per kWh by 2007; (2) Double the number of States with geothermal electric power facilities to eight by 2006; and (3) Supply the electrical power or heat energy needs of 7 million homes and businesses in the United States by 2010. This Federal Geothermal Program Research Update reviews the accomplishments of DOE's Geothermal Program for Federal Fiscal Year (FY) 2003. The information contained in this Research Update illustrates how the mission and goals of the Office of Geothermal Technologies are reflected in each R&D activity. The Geothermal Program, from its guiding principles to the most detailed research activities, is focused on expanding the use of geothermal energy. balanced strategy for the Geothermal Program.

  16. Advanced Automotive Technologies annual report to Congress, fiscal year 1996

    SciTech Connect (OSTI)

    1998-03-01

    This annual report serves to inform the United States Congress on the progress for fiscal year 1996 of programs under the Department of Energy`s Office of Advanced Automotive Technologies (OAAT). This document complies with the legislative requirement to report on the implementation of Title III of the Automotive Propulsion Research and Development Act of 1978. Also reported are related activities performed under subsequent relevant legislation without specific reporting requirements. Furthermore, this report serves as a vital means of communication from the Department to all public and private sector participants. Specific requirements that are addressed in this report are: Discussion of how each research and development contract, grant, or project funded under the authority of this Act satisfies the requirements of each subsection; Current comprehensive program definition for implementing Title III; Evaluation of the state of automotive propulsion system research and development in the United States; Number and amount of contracts and grants awarded under Title III; Analysis of the progress made in developing advanced automotive propulsion system technology; and Suggestions for improvements in automotive propulsion system research and development, including recommendations for legislation.

  17. Abstracts of Phase 1 awards, (fiscal year) 1987

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    Contained in this booklet are abstracts of the Phase I awards made in Fiscal Year 1987 under the Small Business Innovation Research (SBIR) program in the Department of Energy (DOE). The program is designed for implementation in a three-phase process, with Phase I determining the scientific or technical merit and feasibility of ideas proposed for investigation. The period of performance in this initial phase is relatively brief, typically about 6 months, and the awards are limited to $50,000. Phase II is the principal research or research and development effort, and the awards are as high as $500,000 for work to be performed in periods of up to 2 years. Phase III is the commercial application. The 111 Phase I projects described were selected in a highly competitive process from a total of 942 proposals received in response to the 1987 Solicitation. They cover the fields of chemistry, materials, control systems, plant natural products, instrumentation, nuclear medicine, health and environmental effects, high energy physics, particle accelerators, nuclear physics, plasma diagnostics and confinement, fusion energy systems, robotics and remote systems, nuclear reactors, space nuclear power, fuel cycle, decontamination/decommissioning, commputers in nuclear plants, coal, enhanced oil recovery/tar sands, fossil energy, photovoltaics, solar thermal, ceramics for heat engines, and industrial separation, conversion and recovery processes. (DLC)

  18. HSI Tape Ordering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tape Ordering HSI Tape Ordering General Procedure If you are retrieving multiple files from HPSS, it is best to order your retrieval requests in a way that makes sense for the HPSS system. In HPSS, files initially go onto a disk cache and migrate to tape as time passes. This means that files that were put into HPSS at the same time could end up spread across multiple tapes. Since each tape must by loaded into the reader, it will be fastest if you order your requests so that you are pulling all

  19. Joint Outreach Task Group Calendar: September 2013

    Broader source: Energy.gov [DOE]

    Joint Outreach Task Group (JOTG)has created a monthly calendar of community events to facilitate interagency and community involvement in these events. September 2013

  20. NREL Job Task Analysis: Quality Control Inspector

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2011-05-01

    A summary of job task analyses for the position of quality control inspector when evaluating weatherization work that has been done on a residence.

  1. Weardale Task Force | Open Energy Information

    Open Energy Info (EERE)

    that is developing a sustainable community in the East gate area which will be run on wind, solar, biomass, geothermal and hydro power. References: Weardale Task Force1...

  2. NREL Job Task Analysis: Energy Auditor

    SciTech Connect (OSTI)

    Kurnik, C.; Woodley, C.

    2011-05-01

    A summary of job task analyses for the position of energy auditor when evaluating a residence before and during weatherization work.

  3. Interagency Energy Management Task Force Members

    Broader source: Energy.gov [DOE]

    The Interagency Energy Management Task Force is led by the Federal Energy Management Program director. Members include energy and sustainability managers from federal agencies.

  4. Directives System Order

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-10-16

    The order prescribes the process for development of Policy Statements, Orders, Notices, Manuals and Guides, which are intended to guide, inform, and instruct employees in the performance of their jobs, and enable them to work effectively within the Department and with agencies, contractors, and the public.

  5. Fuel Thermo-physical Characterization Project. Fiscal Year 2014 Final Report

    SciTech Connect (OSTI)

    Burkes, Douglas; Casella, Andrew M.; Buck, Edgar C.; Casella, Amanda J.; Edwards, Matthew K.; MacFarlan, Paul J.; Pool, Karl N.; Slonecker, Bruce D.; Smith, Frances N.; Steen, Franciska H.

    2015-03-15

    The Office of Material Management and Minimization (M3) Reactor Conversion Fuel Thermo-Physical Characterization Project at Pacific Northwest National Laboratory (PNNL) was tasked with using PNNL facilities and processes to receive irradiated low enriched uranium–molybdenum (LEU-Mo) fuel plate samples and perform analysis in support of the M3 Reactor Conversion Program. This work is in support of the M3 Reactor Conversion Fuel Development Pillar that is managed by Idaho National Laboratory. The primary research scope was to determine the thermo-physical properties as a function of temperature and burnup. Work conducted in Fiscal Year (FY) 2014 complemented measurements performed in FY 2013 on four additional irradiated LEU-Mo fuel plate samples. Specifically, the work in FY 2014 investigated the influence of different processing methods on thermal property behavior, the absence of aluminum alloy cladding on thermal property behavior for additional model validation, and the influence of higher operating surface heat flux / more aggressive irradiation conditions on thermal property behavior. The model developed in FY 2013 and refined in FY 2014 to extract thermal properties of the U-Mo alloy from the measurements conducted on an integral fuel plate sample (i.e., U-Mo alloy with a thin Zr coating and clad in AA6061) continues to perform very well. Measurements conducted in FY 2014 on samples irradiated under similar conditions compare well to measurements performed in FY 2013. In general, there is no gross influence of fabrication method on thermal property behavior, although the difference in LEU-Mo foil microstructure does have a noticeable influence on recrystallization of grains during irradiation. Samples irradiated under more aggressive irradiation conditions, e.g., higher surface heat flux, revealed lower thermal conductivity when compared to samples irradiated at moderate surface heat fluxes, with the exception of one sample. This report documents thermal

  6. Muon Collider Task Force Report

    SciTech Connect (OSTI)

    Ankenbrandt, C.; Alexahin, Y.; Balbekov, V.; Barzi, E.; Bhat, C.; Broemmelsiek, D.; Bross, A.; Burov, A.; Drozhdin, A.; Finley, D.; Geer, S.; /Fermilab /Argonne /Brookhaven /Jefferson Lab /LBL, Berkeley /MUONS Inc., Batavia /UCLA /UC, Riverside /Mississippi U.

    2007-12-01

    Muon Colliders offer a possible long term path to lepton-lepton collisions at center-of-mass energies {radical}s {ge} 1 TeV. In October 2006 the Muon Collider Task Force (MCTF) proposed a program of advanced accelerator R&D aimed at developing the Muon Collider concept. The proposed R&D program was motivated by progress on Muon Collider design in general, and in particular, by new ideas that have emerged on muon cooling channel design. The scope of the proposed MCTF R&D program includes muon collider design studies, helical cooling channel design and simulation, high temperature superconducting solenoid studies, an experimental program using beams to test cooling channel RF cavities and a 6D cooling demonstration channel. The first year of MCTF activities are summarized in this report together with a brief description of the anticipated FY08 R&D activities. In its first year the MCTF has made progress on (1) Muon Collider ring studies, (2) 6D cooling channel design and simulation studies with an emphasis on the HCC scheme, (3) beam preparations for the first HPRF cavity beam test, (4) preparations for an HCC four-coil test, (5) further development of the MANX experiment ideas and studies of the muon beam possibilities at Fermilab, (6) studies of how to integrate RF into an HCC in preparation for a component development program, and (7) HTS conductor and magnet studies to prepare for an evaluation of the prospects for of an HTS high-field solenoid build for a muon cooling channel.

  7. JV Task 120 - Coal Ash Resources Research Consortium Research

    SciTech Connect (OSTI)

    Debra Pflughoeft-Hassett; Loreal Heebink; David Hassett; Bruce Dockter; Kurt Eylands; Tera Buckley; Erick Zacher

    2009-03-28

    The Coal Ash Resources Research Consortium{reg_sign} (CARRC{reg_sign}, pronounced 'cars') is the core coal combustion product (CCP) research group at the Energy & Environmental Research Center (EERC). CARRC focuses on performing fundamental and applied scientific and engineering research emphasizing the environmentally safe, economical use of CCPs. CARRC member organizations, which include utilities and marketers, are key to developing industry-driven research in the area of CCP utilization and ensuring its successful application. The U.S. Department of Energy is a partner in CARRC through the EERC Jointly Sponsored Research Program, which provides matching funds for industrial member contributions and facilitates an increased level of effort in CARRC. CARRC tasks were designed to provide information on CCP performance, including environmental performance, engineering performance, favorable economics, and improved life cycle of products and projects. CARRC technical research tasks are developed based on member input and prioritization. CARRC special projects are developed with members and nonmembers to provide similar information and to support activities, including the assembly and interpretation of data, support for standards development and technology transfer, and facilitating product development and testing. CARRC activities from 2007 to 2009 included a range of research tasks, with primary work performed in laboratory tasks developed to answer specific questions or evaluate important fundamental properties of CCPs. The tasks were included in four categories: (1) Environmental Evaluations of CCPs; (2) Evaluation of Impacts on CCPs from Emission Controls; (3) Construction and Product-Related Activities; and (4) Technology Transfer and Maintenance Tasks. All tasks are designed to work toward achieving the CARRC overall goal and supporting objectives. The various tasks are coordinated in order to provide broad and useful technical data for CARRC members. Special

  8. Interim Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada, for Fiscal Years 2012 and 2013

    SciTech Connect (OSTI)

    Silvas, A J

    2013-10-24

    This letter report documents interim activities that have been completed at CAU 114 in fiscal years 2012 and 2013.

  9. Hanford Site groundwater monitoring for fiscal year 1996

    SciTech Connect (OSTI)

    Hartman, M.J.; Dresel, P.E.; Borghese, J.V.

    1997-02-01

    This report presents the results of groundwater and vadose-zone monitoring for fiscal year (FY) 1996 on the Hanford Site, Washington. Hanford Site operations from 1943 onward produced large quantities of radiological and chemical waste that affected groundwater quality on the site. Characterization and monitoring of the vadose zone during FY 1996 comprised primarily spectral gamma logging, soil-gas monitoring, and electrical resistivity tomography. Water-level monitoring was performed to evaluate groundwater-flow directions, to track changes in water levels, and to relate such changes to evolving disposal practices. Water levels over most of the Hanford Site continued to decline between June 1995 and June 1996. Groundwater chemistry was monitored to track the extent of contamination, to note trends, and to identify emerging groundwater-quality problems. The most widespread radiological contaminant plumes were tritium and iodine-129. Smaller plumes of strontium-90, technetium-99, and plutonium also were present at levels above the U.S. Environmental Protection Agency or State of Washington interim drinking water standards. Uranium concentrations greater than the proposed drinking water standard were also observed. Nitrate, fluoride, chromium, carbon tetrachloride, chloroform, trichloroethylene, and cis-1,2-dichlomethylene were present in groundwater samples at levels above their U.S. Environmental Protection Agency or State of Washington maximum contaminant levels. The nitrate plume is the most extensive. Three-dimensional, numerical, groundwater models were applied to the Hanford Site to predict contaminant-flow paths and the impact of operational changes on site groundwater conditions. Other models were applied to assess the performance of three separate pump-and-treat systems.

  10. First Quarter Hanford Seismic Report for Fiscal Year 2009

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2009-03-15

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. This includes three recently acquired Transportable Array stations located at Cold Creek, Didier Farms, and Phinney Hill. For the Hanford Seismic Network, ten local earthquakes were recorded during the first quarter of fiscal year 2009. All earthquakes were considered as “minor” with magnitudes (Mc) less than 1.0. Two earthquakes were located at shallow depths (less than 4 km), most likely in the Columbia River basalts; five earthquakes at intermediate depths (between 4 and 9 km), most likely in the sub-basalt sediments); and three earthquakes were located at depths greater than 9 km, within the basement. Geographically, four earthquakes occurred in known swarm areas and six earthquakes were classified as random events.

  11. Second Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-06-26

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, seven local earthquakes were recorded during the second quarter of fiscal year 2008. The largest event recorded by the network during the second quarter (February 3, 2008 - magnitude 2.3 Mc) was located northeast of Richland in Franklin County at a depth of 22.5 km. With regard to the depth distribution, two earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), three earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and two earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, five earthquakes occurred in swarm areas and two earthquakes were classified as random events.

  12. First Quarter Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-03-21

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The Hanford Seismic Assessment Team locates and identifies sources of seismic activity and monitors changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 41 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. For the Hanford Seismic Network, forty-four local earthquakes were recorded during the first quarter of fiscal year 2008. A total of thirty-one micro earthquakes were recorded within the Rattlesnake Mountain swarm area at depths in the 5-8 km range, most likely within the pre-basalt sediments. The largest event recorded by the network during the first quarter (November 25, 2007 - magnitude 1.5 Mc) was located within this swarm area at a depth of 4.3 km. With regard to the depth distribution, three earthquakes occurred at shallow depths (less than 4 km, most likely in the Columbia River basalts), thirty-six earthquakes at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and five earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, thirty-eight earthquakes occurred in swarm areas and six earth¬quakes were classified as random events.

  13. Portsmouth Integration Director's Final Findings and Order | Department of

    Energy Savers [EERE]

    Energy Integration Director's Final Findings and Order Portsmouth Integration Director's Final Findings and Order Portsmouth Integration Director's Final Findings and Order purpose is to: integrate the on-site work required for specific units to avoid duplication of effort, and efficiently perform sitewide ground water monitoring and surveillance and maintenance activities; recognize that a substantial portion of the tasks required under existing approved closure plans for certain units have

  14. Ecological Monitoring and Compliance Program Fiscal/Calendar Year 2004 Report

    SciTech Connect (OSTI)

    Bechtel Nevada

    2005-03-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to Nevada Test Site biota. This report summarizes the program's activities conducted by Bechtel Nevada during the Fiscal Year 2004 and the additional months of October, November, and December 2004, reflecting a change in the monitoring period to a calendar year rather than a fiscal year as reported in the past. This change in the monitoring period was made to better accommodate information required for the Nevada Test Site Environmental Report, which reports on a calendar year rather than a fiscal year. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, (5) habitat restoration monitoring, and (6) biological monitoring at the Hazardous Materials Spill Center.

  15. LMS/RBL/S11219 Task Order LM00-502

    Office of Legacy Management (LM)

    Samples were collected from a total of two onsite wells, four private wells from nearby ... well) 05142013 ND 2.04 ND RB-D-03 (private well) 05142013 ND 0.637 ND RB-W-01 ...

  16. LMS/RUL/S11973 Task Order LM00-502

    Office of Legacy Management (LM)

    ... Analysis: Radiochemistry and Wet Chemistry Validator: Stephen Donivan Review Date: ... left blank Page 25 Gas Matrix Chemistry Data by Location (USEE510) FOR SITE ...

  17. Practical Guide to Savings and Payments in FEMP ESPC Task Orders

    Office of Energy Efficiency and Renewable Energy (EERE)

    Document conveys to Federal agencies how to interpret and apply the statutes and rules governing cost savings and payments for energy savings performance contracts (ESPCs) under the Federal Energy Management Program (FEMP).

  18. URS Consent Order

    Office of Environmental Management (EM)

    ... requires the written consent of both Parties. 10. URS waives any and all rights to appeal or otherwise seek judicial or administrative review of the terms of this Consent Order. ...

  19. Task mapping for non-contiguous allocations.

    SciTech Connect (OSTI)

    Leung, Vitus Joseph; Bunde, David P.; Ebbers, Johnathan; Price, Nicholas W.; Swank, Matthew; Feer, Stefan P.; Rhodes, Zachary D.

    2013-02-01

    This paper examines task mapping algorithms for non-contiguously allocated parallel jobs. Several studies have shown that task placement affects job running time for both contiguously and non-contiguously allocated jobs. Traditionally, work on task mapping either uses a very general model where the job has an arbitrary communication pattern or assumes that jobs are allocated contiguously, making them completely isolated from each other. A middle ground between these two cases is the mapping problem for non-contiguous jobs having a specific communication pattern. We propose several task mapping algorithms for jobs with a stencil communication pattern and evaluate them using experiments and simulations. Our strategies improve the running time of a MiniApp by as much as 30% over a baseline strategy. Furthermore, this improvement increases markedly with the job size, demonstrating the importance of task mapping as systems grow toward exascale.

  20. DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at Los Alamos | Department of Energy Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos October 2, 2015 - 2:30pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center announced it intends to solicit by means of full and open competition for

  1. Annual Report of the Integrated Status and Effectiveness Monitoring Program: Fiscal Year 2008

    SciTech Connect (OSTI)

    Terraqua, Inc.

    2009-07-20

    This document was created as an annual report detailing the accomplishments of the Integrated Status and Effectiveness Monitoring Program (ISEMP) in the Upper Columbia Basin in fiscal year 2008. The report consists of sub-chapters that reflect the various components of the program. Chapter 1 presents a report on programmatic coordination and accomplishments, and Chapters 2 through 4 provide a review of how ISEMP has progressed during the 2008 fiscal year in each of the pilot project subbasins: the John Day (Chapter 2), Wenatchee/Entiat (Chapter 3) and Salmon River (Chapter 4). Chapter 5 presents a report on the data management accomplishments in 2008.

  2. WIPP Doubles Solid Waste Reduction Rate in Fiscal Year 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Doubles Solid Waste Reduction Rate in Fiscal Year 2013 WIPP Doubles Solid Waste Reduction Rate in Fiscal Year 2013 December 5, 2013 - 12:00pm Addthis WIPP environmental and operations personnel gather next to pallets that will be provided to the local community as part of WIPP’s wood waste diversion program. WIPP environmental and operations personnel gather next to pallets that will be provided to the local community as part of WIPP's wood waste diversion program. CARLSBAD, N.M.

  3. DOE Celebrates 20-Year Anniversary of Executive Order 12898 on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Justice | Department of Energy Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice DOE Celebrates 20-Year Anniversary of Executive Order 12898 on Environmental Justice April 8, 2014 - 6:05pm Addthis What does this project do? Goal 1. Protect human health and the environment KSA2316_ Sec Moniz with members of DOE EJ Task Force.jpg DOE Secretary Moniz (fifth from left) and members of the DOE EJ Task Force celebrate E0 12898 20-year anniversary.

  4. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    SciTech Connect (OSTI)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution

  5. Fiscal year 1998 Battelle performance evaluation agreement revision 1

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1998 represents the second full year utilizing a results-oriented, performance-based contract. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractors performance for the period October 1, 1997 through September 30, 1998, as required by Articles entitled Use of Objective Standards of Performance, Self Assessment and Performance Evaluation and Critical Outcomes Review of the Contract DE-AC08-76RLO1830. In partnership with the Contractor and other key customers, the Department of Energy (DOE) Richland Operations Office has defined six critical outcomes that same as the core for the Contractors performance evaluation. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory. As stated above six critical outcomes have been established for FY 1998. These outcomes are based on the following needs identified by DOE-HQ, RL and other customers of the Laboratory. Our Energy Research customer desires relevant, quality and cost effective science. Our Environmental Management customer wants technology developed, demonstrated, and deployed to solve environmental cleanup issues. To ensure the diversification and viability of the Laboratory as a National asset, RL and HQ alike want to increase the Science and Technical contributions of PNNL related to its core capabilities. RL wants improved leadership/management, cost-effective operations, and maintenance of a work environment, which fosters innovative thinking and high morale. RL and HQ alike desire compliance with environment, safety and health (ES and H) standards and disciplined conduct of operations for protection of the worker, environment, and the public, As with all of Hanford, DOE expects contribution of the Laboratory to the economic development of the Tri-Cities community, and the region, to build a new local economy that is less reliant on the Hanford mission

  6. Annual Hanford Seismic Report for Fiscal Year 2008

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2008-12-29

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. During fiscal year 2008, the Hanford Seismic Network recorded 1431 triggers on the seismometer system, which included 112 seismic events in the southeast Washington area and an additional 422 regional and teleseismic events. There were 74 events determined to be local earthquakes relevant to the Hanford Site. The highest-magnitude event (3.7 Mc) occurred on May 18, 2008, and was located approximately 17 km east of Prosser at a depth of 20.5 km. With regard to the depth distribution, 13 earthquakes were located at shallow depths (less than 4 km, most likely in the Columbia River basalts), 45 earthquakes were located at intermediate depths (between 4 and 9 km, most likely in the pre-basalt sediments), and 16 earthquakes were located at depths greater than 9 km, within the crystalline basement. Geographically, 54 earthquakes were located in swarm areas and 20 earthquakes were classified as random events. The May 18 earthquake was the highest magnitude event recorded since 1975 in the vicinity of the Hanford Site (between 46 degrees and 47 degrees north latitude and

  7. Hanford Tanks Initiative fiscal year 1997 retrieval technology demonstrations

    SciTech Connect (OSTI)

    Berglin, E.J.

    1998-02-05

    The Hanford Tanks Initiative was established in 1996 to address a range of retrieval and closure issues associated with radioactive and hazardous waste stored in Hanford`s single shell tanks (SSTs). One of HTI`s retrieval goals is to ``Successfully demonstrate technology(s) that provide expanded capabilities beyond past practice sluicing and are extensible to retrieve waste from other SSTS.`` Specifically, HTI is to address ``Alternative technologies to past practice sluicing`` ... that can ... ``successfully remove the hard heel from a sluiced tank or to remove waste from a leaking SST`` (HTI Mission Analysis). During fiscal year 1997, the project contracted with seven commercial vendor teams to demonstrate retrieval technologies using waste simulants. These tests were conducted in two series: three integrated tests (IT) were completed in January 1997, and four more comprehensive Alternative Technology Retrieval Demonstrations (ARTD) were completed in July 1997. The goal of this testing was to address issues to minimize the risk, uncertainties, and ultimately the overall cost of removing waste from the SSTS. Retrieval technologies can be separated into three tracks based on how the tools would be deployed in the tank: globally (e.g., sluicing) or using vehicles or robotic manipulators. Accordingly, the HTI tests included an advanced sluicer (Track 1: global systems), two different vehicles (Track 2: vehicle based systems), and three unique manipulators (Track 3: arm-based systems), each deploying a wide range of dislodging tools and conveyance systems. Each industry team produced a system description as envisioned for actual retrieval and a list of issues that could prevent using the described system; defined the tests to resolve the issues; performed the test; and reported the results, lessons learned, and state of issue resolution. These test reports are cited in this document, listed in the reference section, and summarized in the appendices. This report

  8. CATERING ORDER;SA 4500-CCC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4500-CCC (4-2015) Supersedes (11-2014) issue CATERING ORDER Your Name: ____ I certify that I have Completed and had my Manager complete: FIN100.1.TNT.6 Obtain Business Meeting Meal and Refreshment Approval procedure. Phone: Date of Delivery: Charging Organization # / Purpose: Project: Task: Delivery Location (Building/Room): Number of attendees to be served: A.M. Service Time: P.M. Service Time: Lunch Service Time: * A replacement fee will be charged if equipment is missing or not returned in 24

  9. Order 13287, Preserve America

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 In response to requirements of Executive Order 13287, Preserve America Office of History and Heritage Resources Office of the Executive Secretariat U.S. Department of Energy September 2014 An Assessment of Historic Properties and Preservation Activities at the U.S. Department of Energy Table of Contents Introduction ............................................................................................................................................ 3 Part I. Background and Overview

  10. FY 2006 Executive Order 13101 Report: Department of Energy Affirmative...

    Broader source: Energy.gov (indexed) [DOE]

    Procurement and Recycling Fiscal Year 2006 Report More Documents & Publications 1 OPAM Policy Acquisition Guides Chapter 23 - Environment, Energy and Water Efficiency, Renewable...

  11. Implementation of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-08-12

    This Notice provides guidance for implementing the mandates of Section 1072 of the National Defense Authorization Act for Fiscal Year 2008, commonly referred to as the Bond Amendment. Extended until 9-28-11 by DOE N 251.90 dated 9-28-10. Canceled by DOE O 472.2. Does not cancel other directives.

  12. Tax and Fiscal Policies for Promotion of Industrial EnergyEfficiency: A Survey of International Experience

    SciTech Connect (OSTI)

    Price, Lynn; Galitsky, Christina; Sinton, Jonathan; Worrell,Ernst; Graus, Wina

    2005-09-15

    The Energy Foundation's China Sustainable Energy Program (CSEP) has undertaken a major project investigating fiscal and tax policy options for stimulating energy efficiency and renewable energy development in China. This report, which is part of the sectoral sub-project studies on energy efficiency in industry, surveys international experience with tax and fiscal policies directed toward increasing investments in energy efficiency in the industrial sector. The report begins with an overview of tax and fiscal policies, including descriptions and evaluations of programs that use energy or energy-related carbon dioxide (CO2) taxes, pollution levies, public benefit charges, grants or subsidies, subsidized audits, loans, tax relief for specific technologies, and tax relief as part of an energy or greenhouse gas (GHG) emission tax or agreement scheme. Following the discussion of these individual policies, the report reviews experience with integrated programs found in two countries as well as with GHG emissions trading programs. The report concludes with a discussion of the best practices related to international experience with tax and fiscal policies to encourage investment in energy efficiency in industry.

  13. Contract 98, Appendix F self-assessment report for Fiscal Year 2003

    SciTech Connect (OSTI)

    Albert , Rich

    2003-10-15

    This report summarizes the Ernest Orlando Lawrence Berkeley National Laboratory internal assessment of Laboratory operational and administrative performance in key support functions for Fiscal Year (FY) 2003. The report provides documentation of ongoing performance-based management and oversight processes required by the Department of Energy (DOE) to monitor, measure, and evaluate Berkeley Lab work.

  14. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2004

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Conservation Programs Fiscal Year 2004 February 24, 2006 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS I. Overview of Federal Energy Consumption and Costs . . . . . . . . . . . . . . . . . . . . . . . 1 A. Standard Buildings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 B. Industrial, Laboratory and Other Energy Intensive

  15. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2005

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Federal Government Energy Management and Conservation Programs Fiscal Year 2005 September 26, 2006 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS EXECUTIVE SUMMARY ....................................................................................................E-1 I. Overview of Federal Energy Consumption and Costs ................................................1 A. Standard

  16. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2006 November 26, 2008 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS EXECUTIVE SUMMARY .........................................................................................................E-1 I. OVERVIEW OF FEDERAL ENERGY CONSUMPTION AND COSTS................................ 1

  17. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2007 January 27, 2010 U.S. Department of Energy Assistant Secretary, Energy Efficiency and Renewable Energy Federal Energy Management Program Washington, DC 20585 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................ 1 I. OVERVIEW OF FEDERAL ENERGY CONSUMPTION AND COSTS................................ 1

  18. Overview of the Defense Programs Research and Technology Development Program for fiscal year 1993. Appendix materials

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    The pages that follow contain summaries of the nine R&TD Program Element Plans for Fiscal Year 1993 that were completed in the Spring of 1993. The nine program elements are aggregated into three program clusters as follows: Design Sciences and Advanced Computation; Advanced Manufacturing Technologies and Capabilities; and Advanced Materials Sciences and Technology.

  19. Moab Project Contractor Scores 'Very Good' on Fiscal Year 2015 Performance

    Broader source: Energy.gov [DOE]

    MOAB, Utah – Portage, Inc., the remedial action contractor for EM’s Moab Uranium Mill Tailings Remedial Action Project, met the majority of its performance goals in fiscal year 2015, earning $1,255,640, or 84 percent, of a potential award fee amount of $1,494,810 and an overall weighted result of “very good.”

  20. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    SciTech Connect (OSTI)

    BOGER, R.M.

    1999-05-13

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented.

  1. Clinch River MRS Task Force Recommendations

    Broader source: Energy.gov [DOE]

    The Clinch River HRS Task Force was appointed in July 1985 by the Roane County Executive and the Oak Ridge City Council to evaluate the Monitored Retrievable Storage (MRS) facility proposed by the...

  2. Departmental Response: SEAB Task Force Recommendations on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Departmental Response: SEAB Task Force Recommendations on Technology Development for Environmental Management Introduction In May 2014, Energy Secretary Ernest Moniz charged the Secretary of Energy Advisory Board (SEAB) to provide advice as to how the United States (U.S.) Department of Energy (DOE) could more effectively ensure the development of technology necessary for the Office of Environmental Management (EM) to complete its mission, cleanup of legacy waste sites. The SEAB formed a Task

  3. S. 936: A Bill to authorize appropriations for fiscal year 1998 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe personnel strengths for such fiscal year for the Armed Forces, and for other purposes. Introduced in the Senate of the United States, One Hundred Fifth Congress, First session

    SciTech Connect (OSTI)

    1997-12-31

    This report discusses a bill that may be cited as the National Defense Authorization Act for fiscal year 1998.

  4. NMED Consent Order

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    begins environmental sampling in townsite September 25, 2008 Vicinity of Upper LA Canyon Investigated as Part of NMED Consent Order LOS ALAMOS, New Mexico, September 25, 2008-Environmental sampling, conducted on behalf of Los Alamos National Laboratory in the town of Los Alamos near upper Los Alamos Canyon, has begun. Known as the Upper Los Alamos Canyon Project, this effort is an environmental assessment of areas that have been or could have been affected by Laboratory operations from the days

  5. High Order Seismic Simulations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Order Seismic Simulations on the Intel Xeon Phi Processor (Knights Landing) Alexander Heinecke 1 , Alexander Breuer 2 , Michael Bader 3 , and Pradeep Dubey 1 1 Intel Corporation, 2200 Mission College Blvd., Santa Clara 95054, CA, USA 2 University of California, San Diego, 9500 Gilman Dr., La Jolla 92093, CA, USA 3 Technische Universit¨ at M¨ unchen, Boltzmannstr. 3, D-85748 Garching, Germany Abstract. We present a holistic optimization of the ADER-DG finite element software SeisSol targeting

  6. Ecological Monitoring and Compliance Program Fiscal Year 2000 Report

    SciTech Connect (OSTI)

    Wills, C.A.

    2000-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition

  7. Ecological Monitoring and Compliance Program Fiscal Year 2001

    SciTech Connect (OSTI)

    C. A. Wills

    2001-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A

  8. First Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-03-29

    The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 81 local earthquakes during the first quarter of FY 2010. Sixty-five of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter is a continuation of the swarm events observed during fiscal year 2009 and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2009d). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (2.5 Mc) occurred on December 22 at depth 2.1 km. The average depth of the Wooded Island events during the quarter was 1.4 km with a maximum depth estimated at 3.1 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford SMA network was triggered several times by these events and the SMA recordings are discussed in section 6.0. During the last year some Hanford employees working within a few miles of the swarm area and individuals living directly across the Columbia River from the swarm center have reported feeling many of the larger magnitude events. Strong motion accelerometer (SMA) units installed directly above the swarm area at ground surface measured peak ground accelerations approaching 15% g, the largest values recorded at Hanford. This corresponds to strong shaking of the ground, consistent with what people in the local area have reported. However, the duration and magnitude of these swarm events should not result in any structural damage to facilities. The USGS performed a geophysical survey using satellite

  9. Second Quarter Hanford Seismic Report for Fiscal Year 2010

    SciTech Connect (OSTI)

    Rohay, Alan C.; Sweeney, Mark D.; Hartshorn, Donald C.; Clayton, Ray E.; Devary, Joseph L.

    2010-06-30

    The Hanford Seismic Assessment Program (HSAP) provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network for the U.S. Department of Energy and its contractors. The HSAP is responsible for locating and identifying sources of seismic activity and monitoring changes in the historical pattern of seismic activity at the Hanford Site. The data are compiled, archived, and published for use by the Hanford Site for waste management, natural phenomena hazards assessments, and engineering design and construction. In addition, the HSAP works with the Hanford Site Emergency Services Organization to provide assistance in the event of a significant earthquake on the Hanford Site. The Hanford Seismic Network and the Eastern Washington Regional Network consist of 44 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Assessment Team. The Hanford Seismic Network recorded 90 local earthquakes during the second quarter of FY 2010. Eighty-one of these earthquakes were detected in the vicinity of Wooded Island, located about eight miles north of Richland just west of the Columbia River. The Wooded Island events recorded this quarter were a continuation of the swarm events observed during the 2009 and 2010 fiscal years and reported in previous quarterly and annual reports (Rohay et al; 2009a, 2009b, 2009c, and 2010). Most of the events were considered minor (coda-length magnitude [Mc] less than 1.0) with only 1 event in the 2.0-3.0 range; the maximum magnitude event (3.0 Mc) occurred February 4, 2010 at depth 2.4 km. The average depth of the Wooded Island events during the quarter was 1.6 km with a maximum depth estimated at 3.5 km. This placed the Wooded Island events within the Columbia River Basalt Group (CRBG). The low magnitude of the Wooded Island events has made them undetectable to all but local area residents. The Hanford Strong Motion Accelerometer (SMA) network was triggered several times

  10. ARM - Engineering Change Request & Engineering Change Order Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Change Request & Engineering Change Order Guidelines Page Contents: Guideline for Starting a Request for a New ARM Product, Capability, or Functionality Engineering Task Tracking Tool Tracking Capabilities Getting Closure, the Baseline Change Request Glossary Engineering Change Request & Engineering Change Order Guidelines Requesting Engineered Products and Services in ARM Guideline for Starting a Request for a New ARM Product, Capability, or Functionality The purpose of this guideline

  11. Higher order matrix differential equations with singular coefficient matrices

    SciTech Connect (OSTI)

    Fragkoulis, V. C.; Kougioumtzoglou, I. A.; Pantelous, A. A.; Pirrotta, A.

    2015-03-10

    In this article, the class of higher order linear matrix differential equations with constant coefficient matrices and stochastic process terms is studied. The coefficient of the highest order is considered to be singular; thus, rendering the response determination of such systems in a straightforward manner a difficult task. In this regard, the notion of the generalized inverse of a singular matrix is used for determining response statistics. Further, an application relevant to engineering dynamics problems is included.

  12. Fiscal Year 2015 Annual Environmental Justice Implementation Progress Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy has been committed to environmental justice since the February 11, 1994, signing of Presidential Executive Order 12898, Federal Actions to Address Environmental...

  13. NREL Job Task Analysis: Retrofit Installer Technician | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy NREL Job Task Analysis: Retrofit Installer Technician NREL Job Task Analysis: Retrofit Installer Technician A summary of job task analyses for the position of retrofit installer technician when conducting weatherization work on a residence. 51671.pdf (341.28 KB) More Documents & Publications NREL Job Task Analysis: Retrofit Installer Technician (Revised) NREL Job Task Analysis: Energy Auditor NREL Job Task Analysis: Quality Control Inspector

  14. Estimation of Energy Savings Resulting From the BestPractices Program, Fiscal Year 2002

    SciTech Connect (OSTI)

    Truett, LF

    2003-09-24

    Within the U.S. Department of Energy (DOE), the Office of Energy Efficiency and Renewable Energy (EERE) has a vision of a future with clean, abundant, reliable, and affordable energy. Within EERE, the Industrial Technologies Program (ITP), formerly the Office of Industrial Technologies, works in partnership with industry to increase energy efficiency, improve environmental performance, and boost productivity. The BestPractices (BP) Program, within ITP, works directly with industries to encourage energy efficiency. The purpose of the BP Program is to improve energy utilization and management practices in the industrial sector. The program targets distinct technology areas, including pumps, process heating, steam, compressed air, motors, and insulation. This targeting is accomplished with a variety of delivery channels, such as computer software, printed publications, Internet-based resources, technical training, technical assessments, and other technical assistance. A team of program evaluators from Oak Ridge National Laboratory (ORNL) was tasked to evaluate the fiscal year 2002 (FY02) energy savings of the program. The ORNL assessment enumerates levels of program activity for technology areas across delivery channels. In addition, several mechanisms that target multiple technology areas--e.g., Plant-wide Assessments (PWAs), the ''Energy Matters'' newsletter, and special events--are also evaluated for their impacts. When possible, the assessment relies on published reports and the Industrial Assessment Center (IAC) database for estimates of energy savings that result from particular actions. Data were also provided by ORNL, Lawrence Berkeley National Laboratory (LBNL) and Project Performance Corporation (PPC), the ITP Clearinghouse at Washington State University, the National Renewable Energy Laboratory (NREL), Energetics Inc., and the Industrial Technologies Program Office. The estimated energy savings in FY02 resulting from activities of the BP Program are almost

  15. U.S. Department of Energy Issues Fiscal Year 2011 Funding Opportunity Announcements to Enhance Nuclear Energy Education Infrastructure

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy today announced two new fiscal year 2011 Funding Opportunity Announcements to support university and college efforts to build or expand their school’s nuclear science and engineering basic research or education capabilities.

  16. Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado State fiscal year 1994. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1994 (1 July 1993 through 30 June 1994). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Naturita, Gunnison, and Rifle, Colorado. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. Information on wages, taxes, and subcontract expenditures in combination with estimates and economic multipliers is used to estimate the dollar economic benefits to Colorado during the state fiscal year. Finally, the fiscal year 1994 estimates are compared to fiscal year 1993 employment and economic information.

  17. FAQS Job Task Analyses - Safeguards and Security General Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Security General Technical Base FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a...

  18. H2FIRST Hydrogen Contaminant Detector Task: Requirements Document...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen Contaminant Detector Task Requirements Document and Market Survey Danny Terlip, ... California 94550 www.sandia.gov H2FIRST Hydrogen Contaminant Detector Task Requirements ...

  19. Task Force on Climate Preparedness and Resilience Announces Tribal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Task Force on Climate Preparedness and Resilience Announces Tribal Climate Resilience Program Task Force on Climate Preparedness and Resilience Announces Tribal Climate Resilience ...

  20. Linkage to Previous International PV Module QA Task Force Workshops...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Linkage to Previous International PV Module QA Task Force Workshops: Proposal for Rating System Linkage to Previous International PV Module QA Task Force Workshops: Proposal for ...

  1. Collaborative Utility Task Force Partners with DOE to Develop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collaborative Utility Task Force Partners with DOE to Develop Cyber Security Requirements for Advanced Metering Infrastructure Collaborative Utility Task Force Partners with DOE to ...

  2. Federal Task Force Sends Recommendations to President on Fostering...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology Federal Task Force Sends Recommendations to President on Fostering Clean Coal Technology ...

  3. FAQS Job Task Analyses - Fire Protection Engineering | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fire Protection Engineering FAQS Job Task Analyses - Fire Protection Engineering FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job ...

  4. U.S. Support Program tasks

    SciTech Connect (OSTI)

    Langner, D.G.

    1998-09-01

    In the fall of 1993, President Clinton announced before the United Nations General Assembly, that the US would voluntarily offer excess fissile material of weapons origin to International Atomic Energy Agency (IAEA) safeguards. There are presently five US Support Program tasks at work. Three are complete, and two are underway. Reports are available from two of the completed SP-1s; a draft is in preparation for the third. These tasks are: (1) plutonium scrap multiplicity counter at Hanford; (2) calorimeter authentication at Hanford; (3) large neutron multiplicity counter at Rocky Flats; (4) calorimeter authentication at Rocky Flats; and (5) safeguards approach support at the APSF, SRS. The status of the first four tasks above is described here. Information on the work at Savannah River is contained in a separate paper.

  5. The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit, OAS-FS-13-03

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-03 November 2012 Department of Energy Washington, DC 20585 November 15, 2012 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent

  6. Laboratory Directed Research and Development annual report, fiscal year 1997

    SciTech Connect (OSTI)

    1998-03-01

    The Department of Energy Order 413.2(a) establishes DOE`s policy and guidelines regarding Laboratory Directed Research and Development (LDRD) at its multiprogram laboratories. As described in 413.2, LDRD is research and development of a creative and innovative nature which is selected by the Laboratory Director or his or her designee, for the purpose of maintaining the scientific and technological vitality of the Laboratory and to respond to scientific and technological opportunities in conformance with the guidelines in this Order. DOE Order 413.2 requires that each laboratory submit an annual report on its LDRD activities to the cognizant Secretarial Officer through the appropriate Operations Office Manager. The report provided in this document represents Pacific Northwest National Laboratory`s LDRD report for FY 1997.

  7. Annual report: Purchasing and Materials Management Organization, Sandia National Laboratories, fiscal year 1992

    SciTech Connect (OSTI)

    Zaeh, R.A.

    1993-04-01

    This report summarizes the purchasing and transportation activities of the Purchasing and Materials Management Organization for Fiscal Year 1992. Activities for both the New Mexico and California locations are included. Topics covered in this report include highlights for fiscal year 1992, personnel, procurements (small business procurements, disadvantaged business procurements, woman-owned business procurements, New Mexico commercial business procurements, Bay area commercial business procurements), commitments by states and foreign countries, and transportation activities. Also listed are the twenty-five commercial contractors receiving the largest dollar commitments, commercial contractors receiving commitments of $1,000 or more, integrated contractor and federal agency commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California, and transportation commitments of $1,000 or more from Sandia National Laboratories/New Mexico and California.

  8. U.S. Transport Task Force 2010

    SciTech Connect (OSTI)

    Diamond, P.H.

    2011-09-21

    The Transport Task Force (TTF) Meeting is a venue for vigorous scientific discourse and discussion on topics in transport and turbulence in fusion plasmas. Its participation is international. The 2010 meeting was highly effective, with 139 registered participants and 131 presentations. This is remarkable for an even year (IAEA year) meeting. The meeting clearly fostered progress in understanding and control of turbulent transport.

  9. Fiscal Year 2014 Annual Report on BNLs Next Generation Safeguards Initiative Human Capital Development Activities

    SciTech Connect (OSTI)

    Pepper S. E.

    2014-10-10

    Brookhaven National Laboratory’s (BNL’s) Nonproliferation and National Security Department contributes to the National Nuclear Security Administration Office of Nonproliferation and International Security Next Generation Safeguards Initiative (NGSI) through university engagement, safeguards internships, safeguards courses, professional development, recruitment, and other activities aimed at ensuring the next generation of international safeguards professionals is adequately prepared to support the U.S. safeguards mission. This report is a summary of BNL s work under the NGSI program in Fiscal Year 2014.

  10. Brookhaven highlights for fiscal year 1991, October 1, 1990--September 30, 1991

    SciTech Connect (OSTI)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.; Kuper, J.B.H.

    1991-01-01

    This report highlights Brookhaven National Laboratory's activities for fiscal year 1991. Topics from the four research divisions: Computing and Communications, Instrumentation, Reactors, and Safety and Environmental Protection are presented. The research programs at Brookhaven are diverse, as is reflected by the nine different scientific departments: Accelerator Development, Alternating Gradient Synchrotron, Applied Science, Biology, Chemistry, Medical, National Synchrotron Light Source, Nuclear Energy, and Physics. Administrative and managerial information about Brookhaven are also disclosed. (GHH)

  11. Brookhaven highlights for fiscal year 1991, October 1, 1990--September 30, 1991

    SciTech Connect (OSTI)

    Rowe, M.S.; Cohen, A.; Greenberg, D.; Seubert, L.; Kuper, J.B.H.

    1991-12-31

    This report highlights Brookhaven National Laboratory`s activities for fiscal year 1991. Topics from the four research divisions: Computing and Communications, Instrumentation, Reactors, and Safety and Environmental Protection are presented. The research programs at Brookhaven are diverse, as is reflected by the nine different scientific departments: Accelerator Development, Alternating Gradient Synchrotron, Applied Science, Biology, Chemistry, Medical, National Synchrotron Light Source, Nuclear Energy, and Physics. Administrative and managerial information about Brookhaven are also disclosed. (GHH)

  12. Development of a Foam OTEC System. Final technical report for Fiscal Year 1979

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    Research on Development of a Foam OTEC System, as carried out at Carnegie-Mellon University from October 1, 1978 through September 30, 1979, is described. To a brief section summarizing highlights of research results are appended 12 technical reports which detail specific sections of the program. The work described is continuing and a proposal is currently being submitted to provide support in fiscal 1980.

  13. DOE Golden Field Office Status of FOIA Requests Received - Fiscal Year (FY) 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Golden Field Office Status of FOIA Requests Received - Fiscal Year (FY) 2015 Docket # Description of FOIA Request Status GO-15-001 "The following documents submitted by New England Aqua Ventus I under DE-EE- 0005990: The Awardee Down-Select Letter - Strengths and Weaknesses Document - SF-424, Statement of Project Objectives dated August 27, 2014 -Monthly Progress Report briefing dated October 2013 -New England Aqua Ventus I responses to DOE Questions dated April 2014" Completed -

  14. 300 Area D4 Project Fiscal Year 2008 Building Completion Report

    SciTech Connect (OSTI)

    R. A. Westberg

    2009-01-15

    This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of eighteen buildings in the 300 Area of the Hanford Site that were demolished in Fiscal Year 2008. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate.

  15. Uranium Enrichment Decontamination and Decommissioning Fund's Fiscal Year 2011 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Enrichment Decontamination and Decommissioning Fund's Fiscal Year 2011 Financial Statement Audit OAS-FS-13-02 October 2012 September 7, 2012 Mr. Gregory Friedman Inspector General U.S. Department of Energy 1000 Independence Avenue, S.W. Room 5D-039 Washington, DC 20585 Dear Mr. Friedman: We have audited the financial statements of the Department of Energy's (the Department) Uranium Enrichment Decontamination and Decommissioning Fund (D&D Fund) as of and for the year ended September

  16. Paperclips Etc. Special Order Form

    Energy Savers [EERE]

    ...... Date: ... ALL SPECIAL ORDERS ARE SUBJECT TO FULL PAYMENT OR A RESTOCKING FEE WHEN ITEMS ORDERED ARE RETURNED TO THE SUPPLIER DUE TO THE ...

  17. Hanford Site Protective Barrier Development Program: Fiscal year 1990 highlights

    SciTech Connect (OSTI)

    Cadwell, L.L.

    1991-09-01

    The Hanford Site Protective Barrier Development Program was jointly developed by Pacific Northwest Laboratory (PNL) and Westinghouse Hanford Company (WHC) to design and test an earthen cover system(s) that can be used to inhibit water infiltration; plant, animal, and human intrusion; and wind and water erosion. The joint PNL/WHC program was initiated in FY 1986. To date, research findings support the initial concepts of barrier designs for the Hanford Site. A fine-soil surface is planned to partition surface water into runoff and temporary storage. Transpiration by vegetation that grows in the fine-soil layer will return stored water to the atmosphere as will surface evaporation. A capillary break created by the interface of the fine-soil layer and coarser textured materials below will further limit the downward migration of surface water, making it available over a longer period of time for cycling to the atmosphere. Should water pass the interface, it will drain laterally through a coarse textured sand/gravel layer. Tested barrier designs appear to work adequately to prevent drainage under current and postulated wetter-climate (added precipitation) conditions. Wind and water erosion tasks are developing data to predict the extent of erosion on barrier surfaces. Data collected during the last year confirm the effectiveness of small burrowing animals in removing surface water. Water infiltrating through burrows of larger mammals was subsequently lost by natural processes. Natural analog and climate change studies are under way to provide credibility for modeling the performance of barrier designs over a long period of time and under shifts in climate. 10 refs., 30 figs.

  18. NREL Job Task Analysis: Crew Leader | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crew Leader NREL Job Task Analysis: Crew Leader A summary of job task analyses for the position of crew leader when conducting weatherization work on a residence. NREL Job Task Analysis: Crew Leader (284.29 KB) More Documents & Publications Training Self-Assessment NREL Job Task Analysis: Quality Control Inspector

  19. NREL Job Task Analysis: Energy Auditor | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Auditor NREL Job Task Analysis: Energy Auditor A summary of job task analyses for the position of energy auditor when evaluating a residence before and during weatherization work. NREL Job Task Analysis: Energy Auditor (352.27 KB) More Documents & Publications NREL Job Task Analysis: Quality Control Inspector Training Self-Assessment

  20. FAQS Job Task Analyses- NNSA Package Certification Engineer

    Broader source: Energy.gov [DOE]

    FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task Analyses consists of: Developing a comprehensive list of tasks that define the job such as the duties and responsibilities which include determining their levels of importance and frequency. Identifying and evaluating competencies. Last step is evaluating linkage between job tasks and competencies.