TAP  

Energy Science and Technology Software Center (OSTI)

002357WKSTN00 TAP - Tools for Adaptive Partitioning v. 0.99 Beta  http://www.cca-forum.org/~jaray/TAP/TAP.html 

2

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

3

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

4

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

5

Integration of small taps into (existing) HVDC links  

SciTech Connect

Tapping of HVDC lines to serve intermediate loads or to pick up dispersed generation has always presented formidable technical and economic challenges to transmission planners and to system designers. These challenges have been particularly daunting when the power rating of the tap is small compared to that of the main terminals. This document provides transmission planners with various factors which need to be considered in evaluating the feasibility of tapping existing HVDC transmission lines or in developing alternatives for potential new transmission schemes.

Bahrman, M. [ABB Power Systems, Pittsburgh, PA (United States)] [ABB Power Systems, Pittsburgh, PA (United States); Baker, M. [GEC Alsthom Engineering Systems Ltd., Whetstone (United Kingdom)] [GEC Alsthom Engineering Systems Ltd., Whetstone (United Kingdom); Bowles, J. [and others] [and others

1995-07-01T23:59:59.000Z

6

(DOE/EIS-0285-SA-104): Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Lynch Creek Tap to LaGrande-Cowlitz No.1 8/21/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 1, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-104-Lynch Creek Tap to LaGrande-Cowlitz No. 1 James A. Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1 Location: Near the town of Eatonville, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 29 miles of access roads and corridor will be treated. Vegetation management is required

7

Pinched tap tip varies drips  

Science Journals Connector (OSTI)

... The finding won't fix leaky taps and drippy teapots but could be useful for printing, biotechnology and microelectronics. ...

Philip Ball

2003-11-20T23:59:59.000Z

8

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

9

CHP Technical Assistance Partnerships (CHP TAPs) | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Combined Heat & Power Deployment CHP Technical Assistance Partnerships (CHP TAPs) CHP Technical Assistance Partnerships (CHP TAPs) DOE's CHP Technical Assistance Partnerships...

10

Microsoft Word - Vera Tap CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Victor Hitchens Project Manager - TPC-BELL-1 Proposed Action: Vera Tap to Trentwood Valley Way #1 Project Budget Information: Work order 251700, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions/modifications to electric power transmission facilities within previously developed area. B4.13 Reconstruction and minor relocation of existing electric powerlines approximately 20 miles in length or less. Location: Trentwood, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to add a disconnect switch and 2 wood poles between two existing pole structures

11

Microsoft Word - CX_Snoking_Tap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TELF-TPP-3 Proposed Action: Access road improvement project for structure 12/1 of the Snoking Tap to Echo Lake-Monroe No. 1 Transmission Line. PP&A Project No.: 956 Budget Information: 219977 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.13 Construction, acquisition, and relocation of onsite pathways and short onsite access roads and railroads. Location: Approximately nine miles south of Snohomish, Washington. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to construct a permanent access road to improve vehicle access to the 115-kV Snoking Tap to Echo Lake-Monroe No. 1 Transmission

12

TAP Webcast Transcript July-29, 2009  

Energy.gov (U.S. Department of Energy (DOE))

Transcript of the audio for the July 2009 TAP Webcast titled Economic Impacts of Renewable Energy sponsored by the U.S. Department of Energy (DOE) Technical Assistance Project (TAP) for state and local officials.

13

Microsoft Word - CX_Memo_ChandlerTap_BOR.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 17, 2013 May 17, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Kevlyn Matthews Project Manager - TPCV-TPP-4 Proposed Action: Chandler Tap Line Reconductoring Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Benton County, Washington; Township 9 North, Range 26 East, Section 17 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to reconduct the terminal span on the Chandler tap to Grandview-Red Mountain No. 1 115-kV line in order to allow the Bureau of Reclamation (BOR) to enlarge their Chandler Power and Pumping Plant switchyard, eliminating safety hazards and reducing the incidence of

14

TAP Webinar: High Performance Outdoor Lighting Accelerator  

Energy.gov (U.S. Department of Energy (DOE))

Hosted by the Technical Assistance Program (TAP), this webinar will cover the recently announced expansion of the Better Buildings platform —the High Performance Outdoor Lighting Accelerator (HPOLA).

15

Mt. Vernon Tap : Environmental Assessment.  

SciTech Connect

The proposed Mt. Vernon project would consist of the construction of a substation and transmission line by the Springfield Utility Board (SUB) to the south of the boundary of the City of Springfield in Lane County, Oregon. Bonneville Power Administration (BPA) would participate in the project by furnishing equipment for the project and modifying its transmission lines to provide a new point of delivery to SUB, its public utility customer at the new site. This document addresses the environmental impacts of various alternative solutions. 3 figs.

United States. Bonneville Power Administration.

1982-09-01T23:59:59.000Z

16

Microsoft Word - L0295-StJohnsTap-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn Project Engineering - TELP-TPP-3 Proposed Action: L0295 - St. Johns-St. Helens #1 Interconnection Project Budget Information: Work Order #004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Columbia County, Oregon (T4N, R1W, Section 7) Proposed by: Bonneville Power Administration (BPA) and Columbia River PUD (CRPUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's St. Johns-St. Helens #1 115-kilovolt (kV) transmission line to

17

Microsoft Word - CX-VeraTap_WoodPoles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10, 2011 10, 2011 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Modify two structures along the Vera Tap to Trentwood-Valley Way #1, 115-kV transmission line PP&A Project No: 1669 Work Order No: 259751 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021):  B1.3 Routine maintenance activities...for structures, rights of way, infrastructures such as roads, equipment...routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designed purpose.  B4.6 Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area

18

Webinar: Tapping Into Wind in Urban Environments  

Energy.gov (U.S. Department of Energy (DOE))

This live webinar presented by DOE on "Community Renewable Energy Success Stories: Tapping into Wind in Urban Environments" will take place on Tuesday, September 18, 2012, from 3:00 – 4:15 p.m....

19

Microsoft Word - CX-HorseRanchTap_FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2013 7, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Dustin Liebhaber Project Manager - TELP-TPP-3 Proposed Action: Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line PP&A Project No.: 2,707 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Snohomish County, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to install a new disconnect switch and associated modifications on the Horse Ranch Tap line in Snohomish County, Washington. BPA owns and maintains the line disconnect switch and the first 0.34 miles of the Tap line, while Puget Sound Energy (PSE) owns and operates the remaining 3.48 miles of the H-frame, wood

20

Building Energy Software Tools Directory: TAPS  

NLE Websites -- All DOE Office Websites (Extended Search)

TAPS TAPS Allows users to size hot and cold water services by specifying the properties of pipe work branches connected to one another via nodes. As an option, you can also specify a secondary return pipe work system in the same manner, and TAPS will size the pipe work and the pump required to provide the required flow around the return circuit. Different types of cold-water supply can be specified, such as gravity feed or pressurised. The user can also specify items such as different pipe materials, lagging properties and surface emissivity. Both the outflow circuit and the secondary return circuit are balanced by resizing the non-index runs. Velocity limits can be defined for the system, and if required, the dimensions of certain pipes in the system can be fixed.

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Microsoft Word - CX-ColumbiaREADaytonSubstationTap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Mike Normandeau Customer Account Executive - PSE-SPOKANE Proposed Action: Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project Budget Information: Work Order 00118303, Task 17 PP&A Project No.: PP&A 2089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.12: Construction of electric power lines approximately 10 miles in length or less that are not for the integration of major new generation resources into a main transmission system. Location: Dayton, Columbia County, Washington Township 10 North, Range 39 East, Sections 14-17, 20 & 24 Township 10 North, Range 40 East, Sections 19 & 30

22

Science Week: Bath Taps into Science  

Science Journals Connector (OSTI)

Science Week: Bath Taps into Science Awards: Top of the SHAPs 2002 Wales: Virtual Instruments and Dataloggers INSET in Pembrokeshire Institute of Physics: Mission impossible? Astronomy Competition: Design your own constellations WMAP: Now we know WMAP: Prehistoric inflation WMAP: Where is the L2 Lagrange point? Materials Update: Energy efficient materials Institute of Physics: Women matter at IoP

23

TAP Webinar: Davis-Bacon Act Compliance  

Energy.gov (U.S. Department of Energy (DOE))

This TAP webinar held on Nov. 18, 2014 from 1:00 p.m. - 3:00 p.m. Eastern Standard Time. It will offer information for Energy Department grantees, sub-grantees, and their contractors on complying with Davis-Bacon Act requirements.

24

The parched planet: Water on tap  

Science Journals Connector (OSTI)

... Desalination at a cost Like all Mediterranean countries, Israel receives most of its precipitation during ... caused severe problems for Israel's 8.2 million people. But thanks to the seawater desalination plants that Israel has built over the past decade, the country's taps did ...

Quirin Schiermeier

2014-06-17T23:59:59.000Z

25

Microsoft Word - CX-UnderwoodTapStructureReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-Celilo SUBJECT: Environmental Clearance Memorandum Scott Williams Line Foreman III - TFDF-The Dalles Proposed Action: Structure replacement and access road maintenance on Bonneville Power Administration's (BPA) Underwood Tap transmission line PP&A Project No.: 2683 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Skamania County, Washington Line Corridor Structures TRS County, State Underwood Tap 115-kV Line 26/12, 26/13 and 26/14 3N, 10E, Section 15 Skamania, Washington Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the

26

SEP Success Story: Green Launching Pad Taps Six More Companies...  

Energy Savers (EERE)

Green Launching Pad Taps Six More Companies for Take-off SEP Success Story: Green Launching Pad Taps Six More Companies for Take-off April 29, 2011 - 9:58am Addthis Yesterday, U.S....

27

Microsoft Word - CX-DaytonTapRetirementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Aaron Evans Project Manager - TEP-TPP-1 Proposed Action: Dayton Tap Line Retirement PP&A Project No: 2735 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.10 Deactivation, dismantling, and removal of electric powerlines, substations, switching stations, and other transmission facilities, and right-of-way abandonment Location: The project is located in Columbia County, Washington, in Township 10 North, Range 39 East, Section 20. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to retire and remove the Dayton Tap Line (and associated components) and fund PacifiCorp's removal of associated equipment. The

28

Microsoft Word - CX-CentraliaTap_Chehalis-Covington_TransAlta_WoodPoles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Caldwell Customer Service Engineer - TPC-Olympia Proposed Action: Replace aging wood poles on Trans Alta's Centralia Tap to Chehalis- Covington No. 1 230-kV transmission line. Budget Information: As per agreement with Trans Alta PP&A Project No.: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project is located on Trans Alta's Centralia Tap to Chehalis-Covington No. 1

29

Technical Assistance Project (TAP) Revolving Loan Funds: Basics...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Best Practices Technical Assistance Project (TAP) Revolving Loan Funds: Basics and Best Practices Presentation by Texas LoanSTAR Manager Theresa Sifuentes from the Texas...

30

Transcript of March 28, 2013, TAP webinar titled Internal Benchmarking...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

agency. Typically we started with each agency's financial office, providing expenditure reports for invoices coded to energy. From U.S. DOE TAP Webinar Internal Benchmarking...

31

RECs: Tapping Into The Commercial Customer  

NLE Websites -- All DOE Office Websites (Extended Search)

June 2004 issue June 2004 issue Copyright © 2004 Zackin Publications Inc. All Rights Reserved. RECs: Tapping Into The Commercial Customer Making the business case for renewable energy certificates bought by large corporations. BY CRAIG HANSON AND VINCE VAN SON I n last month's issue, we introduced the renewable energy certificate (REC), a relatively new product that represents the environmental and other non-electrical attributes associated with 1 MWh of electricity generated from renewable resources. We also reported that several major U.S. corporations, including Alcoa, Cargill Dow LLC, Delphi Corp., DuPont, Interface, Johnson & Johnson, Kinko's, Pitney Bowes and Sta- ples, completed the nation's largest aggre- gate corporate purchase of RECs in Sep- tember 2003. Together, these members of

32

Tunable negative-tap photonic microwave filter based on a  

E-Print Network (OSTI)

Tunable negative-tap photonic microwave filter based on a cladding-mode coupler and an optically injected laser of large detuning Sze-Chun Chan,* Qing Liu, Zhu Wang, and Kin Seng Chiang Department: A tunable negative-tap photonic microwave filter using a cladding-mode coupler together with optical

Chan, Sze-Chun

33

Transcript of April 3, 2013, TAP webinar titled State Energy Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

34

Tapping Our Commercial Potential: Work with the National Labs | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping Our Commercial Potential: Work with the National Labs Tapping Our Commercial Potential: Work with the National Labs Tapping Our Commercial Potential: Work with the National Labs October 12, 2011 - 9:59am Addthis Tapping Our Commercial Potential: Work with the National Labs Karina Edmonds Karina Edmonds Technology Transfer Coordinator In order to transform our nation's energy system and secure U.S. leadership in energy technologies, we must maximize the potential of the scientific discoveries made in our National Laboratories. In 2010 alone, the Energy Department's 17 National Laboratories and 5 facilities executed more than 13,500 technology transfer transactions. These transactions include a range of other research and development agreements as well as the licensing of laboratory technologies, negotiated by technology transfer offices across the Department. Technology Transfer

35

United States Department of Energy Technical Assistance Project (TAP)  

Open Energy Info (EERE)

United States Department of Energy Technical Assistance Project (TAP) United States Department of Energy Technical Assistance Project (TAP) Webinar Archive Jump to: navigation, search Tool Summary LAUNCH TOOL Name: United States Department of Energy Technical Assistance Project (TAP) Webinar Archive Agency/Company /Organization: United States Department of Energy Sector: Energy Focus Area: Renewable Energy Resource Type: Training materials, Webinar Complexity/Ease of Use: Simple Website: www1.eere.energy.gov/wip/solutioncenter/webinar_archives.html References: United States Department of Energy Technical Assistance Project (TAP) Webinar Archive[1] Webinar Archives "Here you will find links to presentations and supporting materials from previous Webinars sponsored by the U.S. Department of Energy (DOE) Technical Assistance Project for State and Local Officials organized in

36

Análise metodológica para a conversão de linhas de distribuição de 34,5 KV para 69 KV.  

E-Print Network (OSTI)

??Este trabalho visa apresentar uma análise metodológica para viabilizar a realização da repotenciação, elevando a classe de tensão de linhas de distribuição de 34,5 kV… (more)

Patrick Santos de Oliveira

2011-01-01T23:59:59.000Z

37

DOE Taps Universities for Turbine Technology Science | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Taps Universities for Turbine Technology Science DOE Taps Universities for Turbine Technology Science DOE Taps Universities for Turbine Technology Science July 16, 2009 - 1:00pm Addthis Washington, D.C. - The U.S. Department of Energy announced the selection of three projects under the Office of Fossil Energy's University Turbine Systems Research (UTSR) Program. University researchers will investigate the chemistry and physics of advanced turbines, with the goal of promoting clean and efficient operation when fueled with coal-derived synthesis gas (syngas) and hydrogen fuels. Development of high-efficiency, ultra-clean turbine systems requires significant advances in high temperature materials science, understanding of combustion phenomena, and innovative cooling techniques to maintain integrity of turbine components. Such necessary technology advancements are

38

Tapping Top University Draft Picks to Engineer Solar Championships |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping Top University Draft Picks to Engineer Solar Championships Tapping Top University Draft Picks to Engineer Solar Championships Tapping Top University Draft Picks to Engineer Solar Championships February 2, 2012 - 3:03pm Addthis The Office of Energy Efficiency and Renewable Energy offers a variety of internships, fellowships, and scholarships in addition to the postdoctoral research awards. Current SunShot fellows pose in front of the Apollo Lunar Module at the National Air and Space Museum. | Energy Department file photo. The Office of Energy Efficiency and Renewable Energy offers a variety of internships, fellowships, and scholarships in addition to the postdoctoral research awards. Current SunShot fellows pose in front of the Apollo Lunar Module at the National Air and Space Museum. | Energy Department file

39

Office of Environmental Management Taps Small Business for Waste Isolation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Management Taps Small Business for Waste Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract August 29, 2012 - 4:54pm Addthis A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization This week, Celeritex, LLC landed a contract worth up to $17.8 million with the Office of Environmental Management, having demonstrated through a competetive process that this small business is up to the task of securing and isolating defense-generated Transuranic waste.

40

Program sizes flange or pipe-tap orifice plates  

SciTech Connect

A program has been developed for the HP-41CV programmable calculator that is designed to compute differential pressure across an orifice, gas flow through an orifice, or the orifice-plate bore for orifice plates with flange or pipe taps. It is designed to save time in extracting values from charts, tables, and graphs which are required to perform the calculations. It is based on equations and data from Spink. The program is run by inputing appropriate data via execution of a program entitled ''DATA IN,'' calculating differential pressure via program ''dH20,'' gas flow via program ''FLOW,'' and via program ''BORE.'' Flange-tap calculations are performed with FLAG 01 not set, while pipe-tap calculations are selected by setting FLAG 01.

Hogsett, J.E.

1984-03-12T23:59:59.000Z

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Denver Museum Taps Into Unique Geothermal Source | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Denver Museum Taps Into Unique Geothermal Source Denver Museum Taps Into Unique Geothermal Source Denver Museum Taps Into Unique Geothermal Source March 9, 2010 - 4:59pm Addthis Denver Museum of Nature & Science is planning to install a heat pump system that utilizes the city’s municipal water system. | Photo courtesy of Denver Museum of Nature & Science Denver Museum of Nature & Science is planning to install a heat pump system that utilizes the city's municipal water system. | Photo courtesy of Denver Museum of Nature & Science Stephen Graff Former Writer & editor for Energy Empowers, EERE What will the project do? These energy efficient practices could save the museum up to $7 million over the next 20 years. The heating and air conditioning in the new wing of the Denver Museum if

42

Smart Meters on Tap for Owasso, Oklahoma | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meters on Tap for Owasso, Oklahoma Meters on Tap for Owasso, Oklahoma Smart Meters on Tap for Owasso, Oklahoma September 10, 2010 - 12:52pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this mean for me? Recovery Act-funded smart meter pilot project will help residents lower utility bills. Smart meter installations help utility company respond quicker to power outages. Seeing real-time energy use could help cities save 10% of their annual energy consumption. Owasso, Oklahoma, known as the "city with no limits," is living up to its name with sustainability and energy. The evidence is everywhere. You can't visit the city's website -- or Facebook, Twitter and Flickr accounts, for that matter -- without noticing its robust recycling and composting program, water conversation focus or

43

Microsoft Word - Naselle Tap Modification Loop to Driscoll Sub CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amy Freel Project Manager - TEP-CSB-2 Proposed Action: Naselle Tap Modification Loop into Driscoll Substation Budget Information: Work order 231878 task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.11 Construction or modification of electric power substations. B4.6 Additions/modifications to electric power transmission facilities within previously developed area. Location: Clatsop County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to expand the existing Driscoll Substation to accommodate a 115-kV ring bus and rebuild 2 ½ miles of the Allston-Astoria No. 1 line to

44

Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

45

Transcript of March 28, 2013, TAP webinar titled Internal Benchmarking Outreach and Data Collection Techniques  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on March 28, 2013 and dealing with internal benchmarking outreach and data collection techniques.

46

U.S. DOE TAP Webinar: New Energy Savings Performance Contracting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DOE TAP Webinar: New Energy Savings Performance Contracting Resources Part II U.S. DOE TAP Webinar: New Energy Savings Performance Contracting Resources Part II September 18,...

47

Green Launching Pad Taps Six More Companies for Take-off | Department...  

Energy Savers (EERE)

Launching Pad Taps Six More Companies for Take-off Green Launching Pad Taps Six More Companies for Take-off April 29, 2011 - 3:00pm Addthis Brett Humble New Hampshire State Energy...

48

Parker Planet_EA_Cover_final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

inal inal E N V I R O N M E N TA L A S S E S S M E N T FOR PARKER - PLANET TAP 69-KV TRANSMISSION LINE REBUILD, UPGRADE AND RIGHT-OF-WAY ACTION Prepared For: US Department of Energy 615 South 43rd Avenue Phoenix, AZ 85009 Western Area Power Administration Wester n No: DOE/EA-1685 DOI-BLM-AZ-C030-2009-0051-EA COOPERATING AGENCIES: US Bureau of Land Management US F ish and Wildlife Ser vice FINAL ENVIRONMENTAL ASSESSMENT DOE/EA-1685 DOI-BLM-AZ-C030-2009-0051-EA Parker-Planet Tap 69-kV Transmission Line Rebuild, Upgrade, and Right-of-Way Action San Bernardino County, California and Mohave and La Paz Counties, Arizona

49

Comparison of Trihalomethanes in Tap Water and Blood  

Science Journals Connector (OSTI)

Corpus Christi, TX, tap water exhibited lower THM concentrations with significant proportions of brominated THMs. ... Trihalomethanes (THMs) are a class of disinfection byproducts formed when chlorine reacts with natural organic matter and bromide found in drinking water. ... The THMs were extracted using high-purity pentane (Burdick & Jackson, Muskegon, MI) and were analyzed on a Hewlett-Packard (Avondale, PA) 5890 series II gas chromatograph using electron capture detection based on Standard Method 6232 (21). ...

Amy M. Miles; Philip C. Singer; David L. Ashley; Michele C. Lynberg; Pauline Mendola; Peter H. Langlois; J. R. Nuckols

2002-03-13T23:59:59.000Z

50

Environmental Assessment of Proposed Haskill Substation and Tap Line.  

SciTech Connect

To solve the service problems in the Marion area, BPA is proposing to construct a new 230/24.9-kV substation to tap BPA's existing Libby-Conkelly 230-kV line (different than Hot Springs-Conkelly 230-kV line, but an equally acceptable source). Haskill Substation would be approximately one mile northeast of the town of Marion, Montana, and would serve the western portion of Flathead Electric Cooperative's service area. This report describes possible environmental impacts of the proposed action. 8 refs., 4 figs.

Not Available

1984-05-01T23:59:59.000Z

51

E-Print Network 3.0 - anemia-polycythemia sequence taps Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

patterns inevitably produce rhythms 4. Atonal sequences convey... will not repeatedly enter a tap sequence with the exact ... Source: Anderson, Richard - Department of Computer...

52

Tapping into Wave and Tidal Ocean Power: 15% Water Power by 2030 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping into Wave and Tidal Ocean Power: 15% Water Power by 2030 Tapping into Wave and Tidal Ocean Power: 15% Water Power by 2030 Tapping into Wave and Tidal Ocean Power: 15% Water Power by 2030 January 27, 2012 - 11:30am Addthis A map generated by Georgia Tech's tidal energy resource database shows mean current speed of tidal streams. The East Coast, as shown above, has strong tides that could be tapped to produce energy. | Photo courtesy of Georgia Institute of Technology A map generated by Georgia Tech's tidal energy resource database shows mean current speed of tidal streams. The East Coast, as shown above, has strong tides that could be tapped to produce energy. | Photo courtesy of Georgia Institute of Technology Hoyt Battey Water Power Market Acceleration and Deployment Team Lead, Wind and Water Power Program

53

ANALYSIS OF LIMIT CYCLE STABILITY IN A TAP-CHANGING TRANSFORMER V. Donde I.A. Hiskens  

E-Print Network (OSTI)

ANALYSIS OF LIMIT CYCLE STABILITY IN A TAP-CHANGING TRANSFORMER V. Donde I.A. Hiskens Department of transformer tap changing and load dynamics. Lin- earization of a Poincar´e map is used to prove local of the region of attraction can then be obtained. 1. INTRODUCTION Interactions between tap-changing transformers

Hiskens, Ian A.

54

Microsoft Word - CX_HamptonWindTap.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James L. Hall Project Manager - TPC-TPP-4 Proposed Action: Baseload Energy Inc. Brasada-Harney 115-kV Transmission Line Project Budget Information: 00221791 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 - Additions/modifications to electric power transmission facilities within previously developed areas. Location: Deschutes County, Oregon, T22S, R31E, Sec 10 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project is a result of an interconnection request that was made by Baseload Energy, Inc., to interconnect onto the Federal Columbia River Transmission System. This interconnection request would accommodate a High Altitude Wind

55

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

56

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

57

DOE-Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources DOE-Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources March 31, 2009 - 1:00pm Addthis Washington, DC - A technology as simple as an advanced heater cable may hold the secret for tapping into the nation's largest source of oil, which is contained in vast amounts of shale in the American West. In a recently completed project sponsored by the U.S. Department of Energy (DOE) through the Office of Fossil Energy's Oil and Natural Gas Program, Composite Technology Development (CTD) Inc. successfully demonstrated the application of a ceramic-composite insulated heater cable for oil shale recovery deep underground. The Small Business Innovation Research project provided employment for 25 professionals and resulted in two patent

58

Innovative Telemetry System Will Help Tap Hard-to-Reach Natural Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Telemetry System Will Help Tap Hard-to-Reach Natural Gas Innovative Telemetry System Will Help Tap Hard-to-Reach Natural Gas Resources Innovative Telemetry System Will Help Tap Hard-to-Reach Natural Gas Resources November 2, 2010 - 1:00pm Addthis Washington, DC - The commercialization of an innovative telemetry communications system developed through a U.S. Department of Energy research program will help U.S. producers tap previously hard-to-reach natural gas resources deep underground, resulting in access to additional supplies that will help enhance national energy security. The patented, proprietary Sharewell L.P. EM-MWD electromagnetic (EM) telemetry system was initially developed by the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and E-Spectrum Technologies of San Antonio, Texas, under a four-year, cost-shared

59

Applications of TAP-NDE technique to non-contact ultrasonic inspection in tubulars  

E-Print Network (OSTI)

The possibility and feasibility of experimental detection of localized defects in tubes using laser-induced ultrasonic wave approach through Thermo Acousto Photonic Non Destructive Evaluation (TAP-NDE) and Signal processing through wavelet transform...

Baltazar-Lopez, Martin Eduardo

2005-02-17T23:59:59.000Z

60

Magentic Moment of the +-Resonance via p po Crystal Ball, TAPS collaborations  

E-Print Network (OSTI)

Magentic Moment of the +-Resonance via p po Crystal Ball, TAPS collaborations Introduction Experiment Results Conclusions PhD theses of: B. Boillat, Basel E. Downie, Glasgow S. Schumann, Mainz B

Krusche, Bernd

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

U.S. DOE TAP Webinar - The Energy Audit Process and State Applications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

this just gets to the fact that some of these items can be very technical in nature. U.S. DOE TAP Webinar - The Energy Audit Process and State ApplicationsPage 17 of 33 Erin...

62

U.S. DOE TAP Webinar: New Energy Savings Performance Contracting Resources Part II  

Office of Energy Efficiency and Renewable Energy (EERE)

This month, the U.S. Department of Energy (DOE) Technical Assistance Program (TAP) is excited to offer a webinar reviewing new resources on energy saving performance contracting (ESPC).

63

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network (OSTI)

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

64

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

65

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

66

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

67

Tapping Solar for Hot Water and Cheaper Bills for Puerto Rico | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping Solar for Hot Water and Cheaper Bills for Puerto Rico Tapping Solar for Hot Water and Cheaper Bills for Puerto Rico Tapping Solar for Hot Water and Cheaper Bills for Puerto Rico November 3, 2010 - 10:00am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE What does this mean for me? 150 new jobs. 1200 solar water heaters installed. In Puerto Rico, solar water heaters have been popular for decades. But even with energy savings, not everyone can afford one. Through a new Recovery Act-funded program for the island, more families are showering with water heated by the sun. The U.S. Department of Energy's new Weatherization Assistance Program (WAP) in Puerto Rico has made it a priority to install the systems in homes of income-eligible residents, as part of its weatherization assistance services. The Puerto Rico Energy Affairs Administration (PREAA), which

68

Iowa Start-up Taps Ames Laboratory Technology in Challenge | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Taps Ames Laboratory Technology in Challenge Taps Ames Laboratory Technology in Challenge Iowa Start-up Taps Ames Laboratory Technology in Challenge August 10, 2011 - 2:21pm Addthis Using gas atomization technology developed at the Ames Lab (click through the photo to see a video), IPAT will be able to make titanium powder 10 times more efficiently than traditional powder-making methods. Above right, 1.8 grams of gas atomized titanium powder makes a finished 1.8 gram titanium bolt. | Image Courtesy of IPAT Using gas atomization technology developed at the Ames Lab (click through the photo to see a video), IPAT will be able to make titanium powder 10 times more efficiently than traditional powder-making methods. Above right, 1.8 grams of gas atomized titanium powder makes a finished 1.8 gram titanium bolt. | Image Courtesy of IPAT

69

Idaho Site Taps Old World Process to Treat Nuclear Waste | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste September 9, 2013 - 12:00pm Addthis The Idaho site's sodium distillation system. The Idaho site's sodium distillation system. The top of a sodium distillation vessel, where waste enters the system. The top of a sodium distillation vessel, where waste enters the system. The Idaho site's sodium distillation system. The top of a sodium distillation vessel, where waste enters the system. IDAHO FALLS, Idaho - The EM program at the Idaho site is using an age-old process to treat transuranic (TRU) waste left over from nuclear reactor experiments. Developed in the first century and perfected by moonshiners in the 19th century, distillation will be used at the Idaho Nuclear Technology and

70

Tapping America's Energy Potential Through R&D | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping America's Energy Potential Through R&D Tapping America's Energy Potential Through R&D Tapping America's Energy Potential Through R&D November 30, 2012 - 2:58pm Addthis Statement of Dr. Anthony Cugini, Laboratory Director, National Energy Technology Laboratory before the Subcommittee on Energy and Environment, Committee on Science, Space and Technology, U.S. House of Representatives Chairman Harris, Ranking Member Miller, and members of the Subcommittee, I appreciate the opportunity to discuss the role that the Department of Energy's Office of Fossil Energy's National Energy Technology Laboratory continues to play in the safe and responsible development of the Nation's unconventional oil and natural gas resources. As you know, since 2008, U.S. oil and natural gas production has increased

71

Wisconsin Start-up Taps into Wind Supply Chain | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Start-up Taps into Wind Supply Chain Start-up Taps into Wind Supply Chain Wisconsin Start-up Taps into Wind Supply Chain August 10, 2010 - 2:00pm Addthis Renewegy, LLC received a $525,000 Recovery Act loan to help start its smaller-scale wind turbine business. This fall, the company will begin production on its first batch of turbine systems. | Photo courtesy of Renewegy Renewegy, LLC received a $525,000 Recovery Act loan to help start its smaller-scale wind turbine business. This fall, the company will begin production on its first batch of turbine systems. | Photo courtesy of Renewegy Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Renewegy received $525,000 Recovery Act loan to start wind turbine business Business hired 16 people and projects at least three more by end of

72

Tapping America's Energy Potential Through R&D | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tapping America's Energy Potential Through R&D Tapping America's Energy Potential Through R&D Tapping America's Energy Potential Through R&D November 30, 2012 - 2:58pm Addthis Statement of Dr. Anthony Cugini, Laboratory Director, National Energy Technology Laboratory before the Subcommittee on Energy and Environment, Committee on Science, Space and Technology, U.S. House of Representatives Chairman Harris, Ranking Member Miller, and members of the Subcommittee, I appreciate the opportunity to discuss the role that the Department of Energy's Office of Fossil Energy's National Energy Technology Laboratory continues to play in the safe and responsible development of the Nation's unconventional oil and natural gas resources. As you know, since 2008, U.S. oil and natural gas production has increased

73

Transmission Business Unit Manager  

Energy.gov (U.S. Department of Energy (DOE))

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

74

Environmental Assessment of Proposed Filbert Substation and Tap Project.  

SciTech Connect

The proposal is a cooperative (jointly funded and owned) action between Bonneville Power Administration (BPS) and FGLandP involving construction of the 115/12.5-kV Filbert Substation. BPA would also build a 0.8-mile overhead 115-kV tapline from BPA's Forest Grove-McMinnville 115-kV line to the proposed substation. The Forest Grove-McMinnville transmission line has available capacity to support the proposed substation. The FGLandP would build four underground distribution circuits to connect the substation to its existing distribution system. It is normally BPA's practice to consider several substation location alternatives as a part of its facility siting process. The proposed substation site was recommended after a preliminary field evaluation by BPA determined that building on the proposed site was preferable because available sites south of the Tualatin Valley Highway and Southern Pacific Railroad were either on presently cultivated farmland, were in a floodplain, or were inaccessible without extensive access road construction. The proposed substation site is owned by FGLandP, is designated for use as a utility substation in the Forest Grove Comprehensive Plan, and was purchased by FGLandP in anticipation of a need for its use as a substation site because of its central location in relation to existing and forecasted loads. The site is accessible from Filbert Street (city road), and is gently sloping. This report describes potential environmental impacts of the proposed actions.

United States. Bonneville Power Administration.

1984-03-01T23:59:59.000Z

75

SPECIAL FEATURE: ISOSCAPES Strontium isotopes in tap water from the coterminous USA  

E-Print Network (OSTI)

SPECIAL FEATURE: ISOSCAPES Strontium isotopes in tap water from the coterminous USA LESLEY A., B. J. Tipple, G. N. Mackey, S. A. Hynek, D. P. Fernandez, and J. R. Ehleringer. 2012. Strontium-00122.1 Abstract. Strontium isotope analysis has proven useful in geo-location investigations of organic

Tipple, Brett

76

TAP Gibbs Free Energy, Belief Propagation and Lehel Csato and Manfred Opper  

E-Print Network (OSTI)

TAP Gibbs Free Energy, Belief Propagation and Sparsity Lehel Csat´o and Manfred Opper Neural Gibbs free energy for a general densely connected probabilistic model with qaudratic interactions, approximations based on Free Energies allow us to derive marginal moments by a minimising entropic loss measures

Winther, Ole

77

Technical Assistance Project (TAP) Revolving Loan Funds: Basics and Best Practices  

Energy.gov (U.S. Department of Energy (DOE))

Presentation by Texas LoanSTAR Manager Theresa Sifuentes from the Texas State Energy Conservation Office (SECO) at the August 26, 2009 TAP Webcast for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Technical Assistance Project for state and local officials.

78

TAP Webinar: Best Practices in Energy Data Collection and Tracking in the Public Sector  

Energy.gov (U.S. Department of Energy (DOE))

Hosted by the Technical Assistance Program (TAP), this webinar will cover DOE's Weatherization and Intergovernmental Program Office's step-by-step guide with best practices from state and local governments and school districts across the country demonstrating the value of an energy data tracking effort.

79

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

80

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

82

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

83

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

84

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

85

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

86

Transmission Utilization Group (TUG)  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

87

Transmission Commercial Project Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

88

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

89

NREL: Biomass Research - Marine Corps Taps NREL to Help Replace Aging Steam  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

90

NETL: News Release - DOE-Funded Project Shows Promise for Tapping Vast U.S.  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2009 March 31, 2009 DOE-Funded Project Shows Promise for Tapping Vast U.S. Oil Shale Resources Colorado Company Seeks Patents on Low-Cost, Low-Impact Heater Technology Washington, DC -A technology as simple as an advanced heater cable may hold the secret for tapping into the nation's largest source of oil, which is contained in vast amounts of shale in the American West. In a recently completed project sponsored by the U.S. Department of Energy (DOE) through the Office of Fossil Energy's Oil and Natural Gas Program, Composite Technology Development (CTD) Inc. successfully demonstrated the application of a ceramic-composite insulated heater cable for oil shale recovery deep underground. The Small Business Innovation Research project provided employment for 25 professionals and resulted in two patent applications related to the cable.

91

NREL: Technology Transfer - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

92

NREL: Technology Deployment - Marine Corps Taps NREL to Help Replace Aging  

NLE Websites -- All DOE Office Websites (Extended Search)

Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Marine Corps Taps NREL to Help Replace Aging Steam Plant with Efficient Biomass Cogeneration January 30, 2013 The 1940s central steam plant at the Marine Corps Recruiting Depot (MCRD) on Parris Island, seven miles south of Beaufort, South Carolina, has far exceeded its projected life and is no longer cost-effective to operate. MCRD staff tasked NREL to help replace this artifact with an efficient biomass cogeneration facility. NREL will assess needs and help develop a request for proposal for designing and constructing the new facility. After the initial site review, the NREL assessment team will: Verify existing resources and biomass costs Optimize facility size and location Model the entire system and generate a process flow diagram Estimate costs and create an economic evaluation

93

Vice President, Transmission Marketing & Sales  

Energy.gov (U.S. Department of Energy (DOE))

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

94

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

95

In response to a lively discussion on agri-cultural spraying at the 2008 AirTAP Fall  

E-Print Network (OSTI)

contaminated if a chemical leak or spill during mixing or loading occurs. Minnesota has specific guidelines- gested that AirTAP, MCOA, the Minnesota Department of Transportation, and the MAAA work together

Minnesota, University of

96

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

97

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

98

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

99

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

100

Rural electrification using overhead HVDC transmission lines.  

E-Print Network (OSTI)

??One of mankind’s greatest modern challenges is poverty alleviation. The provision of electricity can greatly assist in this regard. The tapping of small amounts of… (more)

Ijumba, Nelson M.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Transmission Line Security Monitor  

SciTech Connect

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

102

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

103

EIS-0411: Transmission Agency of Northern California Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

104

Transmission Access Resources  

Energy.gov (U.S. Department of Energy (DOE))

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

105

Performance Incentives for Transmission  

E-Print Network (OSTI)

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

106

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

107

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

108

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

109

Transmission Grid Integration  

Energy.gov (U.S. Department of Energy (DOE))

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

110

Honda Transmission Technical Center  

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

111

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

112

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

113

Generic framework for the secure Yuen 2000 quantum-encryption protocol employing the wire-tap channel approach  

Science Journals Connector (OSTI)

It is shown that the security, against known-plaintext attacks, of the Yuen 2000 (Y00) quantum-encryption protocol can be considered via the wire-tap channel model assuming that the heterodyne measurement yields the sample for security evaluation. Employing the results reported on the wire-tap channel, a generic framework is proposed for developing secure Y00 instantiations. The proposed framework employs a dedicated encoding which together with inherent quantum noise at the attacker’s side provides Y00 security.

Miodrag J. Mihaljevi?

2007-05-24T23:59:59.000Z

114

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

115

National Electric Transmission Congestion Study Webinars | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

116

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

117

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

118

Hybrid Transmission Corridor study  

SciTech Connect

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

119

IEEE JOURNAL OF QUANTUM ELECTRONICS, VOL. 42, NO. 5, MAY 2006 477 Tapping Light From Waveguides by High-Order  

E-Print Network (OSTI)

and I. Vorobeichik are with Optun Inc., Santa Clara, CA 95054 USA (e-mail: Romanas facet or em- bedded in the chip itself [4]. In many cases, the required tapping ratio is in the order USA (e-mail: enarevicius@yahoo.com). G. Rosenblum is with TransChip-Israel Research Center, Ramat Gan

Narevicius, Edvardas

120

Tapping the Molecular Potential of Microalgae to Produce Biomass (JGI Seventh Annual User Meeting 2012: Genomics of Energy and Environment)  

ScienceCinema (OSTI)

Richard Sayre, from Los Alamos National Laboratory, presents a talk titled "Tapping the Molecular Potential of Microalgae to Produce Biomass" at the JGI 7th Annual Users Meeting: Genomics of Energy & Environment Meeting on March 22, 2012 in Walnut Creek, California.

Sayre, Richard [LANL

2013-01-22T23:59:59.000Z

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Tap Density Equations of Granular Powders Based on the Rate Process Theory and the Free Volume Concept  

E-Print Network (OSTI)

Tap density of a granular powder is often linked to the flowability via Carr Index that measures how tight a powder can be packed, under an assumption that more easily packed powders usually flow poorly. Understanding how particles are packed is important for revealing why a powder flows better than others. There are two types of empirical equations that were proposed to fit the experimental data of packing fractions vs. numbers of taps in literature: The inverse logarithmic and the stretched exponential. Using the rate process theory and the free volume concept, we obtain the tap density equations and they can be reducible to the two empirical equations currently widely used in literature. Our equations could potentially fit experimental data better with an additional adjustable parameter. The tapping amplitude and frequency, the weight of the granular materials, and the environment temperature are grouped into one parameter that weighs the pace of packing process. The current results, in conjunction with our previous findings, may imply that both dry(granular)and wet(colloidal and polymeric) particle systems are governed by the same physical mechanisms in term of the role of the free volume and how particles behave (a rate controlled process).

Tian Hao

2014-09-05T23:59:59.000Z

122

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

123

Can we remove iodine-131 from tap water in Japan by boiling? – Experimental testing in response to the Fukushima Daiichi Nuclear Power Plant accident  

Science Journals Connector (OSTI)

Iodine-131 concentrations in tap water higher than 100 Bq L?1 were reported by several local governments in Japan following the Fukushima Daiichi Nuclear Power Plant accident. Some individuals in the emergency-response community recommended the boiling of tap water to remove iodine-131. However, the tap water boiling tests in this study showed no iodine-131 loss from the tap water with either short-term boiling (1–10 min) or prolonged boiling (up to 30 min) resulting in up to 3-fold volume reductions. In this situation, boiling was shown to be not effective in removing iodine-131 from tap water; indeed even higher concentrations may result from the liquid-volume reduction accompanying this process.

K. Tagami; S. Uchida

2011-01-01T23:59:59.000Z

124

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

125

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

126

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

127

Transmission line capital costs  

SciTech Connect

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

128

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

129

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

130

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

131

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

132

Continuously variable transmission  

SciTech Connect

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

133

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

134

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

135

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

136

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

137

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

138

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

139

Patterns of Transmission Investment  

E-Print Network (OSTI)

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

140

Boardman to Hemingway Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Transmission Line Circuit Alexander Glasser  

E-Print Network (OSTI)

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

142

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

143

Study of the gamma p --> pi0 pi0 p reaction with the Crystal Ball/TAPS at the Mainz  

E-Print Network (OSTI)

The gamma p --> pi0 pi0 p reaction has been measured from threshold to 1.4 GeV using the Crystal Ball and TAPS photon spectrometers together with the photon tagging facility at the Mainz Microtron. The experimental results include total and differential cross sections as well as specific angular distributions, which were used to extract partial-wave amplitudes. In particular, the energy region below the D13(1520) resonance was studied.

V. L. Kashevarov; A. Fix; S. Prakhov; P. Aguar-Bartolomé; J. R. M. Annand; H. J. Arends; K. Bantawa; R. Beck; V. Bekrenev; H. Berghäuser; A. Braghieri; W. J. Briscoe; J. Brudvik; S. Cherepnya; R. F. B. Codling; E. J. Downie; P. Drexler; L. V. Fil'kov; D. I. Glazier; R. Gregor; E. Heid; D. Hornidge; L. Isaksson; I. Jaegle; O. Jahn; T. C. Jude; I. Keshelashvili; R. Kondratiev; M. Korolija; M. Kotulla; A. Koulbardis; S. Kruglov; B. Krusche; V. Lisin; K. Livingston; I. J. D. MacGregor; Y. Maghrbi; D. M. Manley; J. C. McGeorge; E. F. McNicoll; D. Mekterovic; V. Metag; A. Mushkarenkov; B. M. K. Nefkens; A. Nikolaev; R. Novotny; H. Ortega; M. Ostrick; P. Ott; P. B. Otte; B. Oussena; P. Pedroni; F. Pheron; A. Polonski; J. Robinson; G. Rosner; T. Rostomyan; S. Schumann; M. H. Sikora; D. I. Sober; A. Starostin; I. I. Strakovsky; I. M. Suarez; I. Supek; C. M. Tarbert; M. Thiel; A. Thomas; M. Unverzagt; D. P. Watts; D. Werthmüller; F. Zehr

2012-06-14T23:59:59.000Z

144

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

145

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

146

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

147

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

148

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

149

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

150

Quality inspection of small diameter polymeric medical tubing and attached wire stent using TAP-NDE and the Gabor Wavelet Transform  

E-Print Network (OSTI)

inspection of small diameter polymeric medical tubing. A non-contact, laser-optic based technique referred to as the Thermo-Acousto-Photonic Nondestructive Evaluation (TAP-NDE) was utilized to investigate bond integrity and localized stiffening due...

Harms, Kent David

2012-06-07T23:59:59.000Z

151

The Costs of Doing Two Things at Once for Young and Older Adults: Talking while Walking, Finger Tapping, and Ignoring Speech or Noise  

E-Print Network (OSTI)

Young and older adults provided language samples in response to questions while walking, finger tapping, and ignoring speech or noise. The language samples were scored on 3 dimensions: fluency, complexity, and content. The ...

Kemper, Susan; Herman, Ruth; Lian, Cindy

2003-06-01T23:59:59.000Z

152

Quality inspection of small diameter polymeric medical tubing and attached wire stent using TAP-NDE and the Gabor Wavelet Transform.  

E-Print Network (OSTI)

??A non-contact, laser-optic based technique referred to as the Thermo-Acousto-Photonic Nondestructive Evaluation (TAP-NDE) was utilized to investigate bond integrity and localized stiffening due to an… (more)

Harms, Kent David

2012-01-01T23:59:59.000Z

153

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

154

(DOE/EIS-0285-SA-87): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Cowlitz Tap-Olympia White River 7/23/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-87) Mark Shaw TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed Ecosystems Restoration Projects (road obliteration) Project No: 2002-054-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 7.18 Road Closure Location: Charley Creek Subwatershed, Umatilla National Forest, Idaho Proposed by: Bonneville Power Administration (BPA) and the Nez Perce Tribal Fisheries/Watershed Program Description of the Proposed Action: BPA is proposing to fund a project that will address

155

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

156

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

157

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network (OSTI)

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

158

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

159

National Electric Transmission Congestion Study: Preliminary...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

160

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Dynamic Transmission Electron Microscopy  

SciTech Connect

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

162

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Energy.gov (U.S. Department of Energy (DOE))

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

163

Transmission Reliability | Department of Energy  

Energy Savers (EERE)

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

164

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

165

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

166

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

167

Hydrogen Transmission and Distribution Workshop  

Energy.gov (U.S. Department of Energy (DOE))

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

168

Direct current power transmission systems  

SciTech Connect

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

169

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

170

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

171

Regional Transmission Projects: Finding Solutions  

SciTech Connect

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

172

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Energy.gov (U.S. Department of Energy (DOE))

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

173

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

174

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

175

Bibliography on transmission access issues  

SciTech Connect

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

176

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

177

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook)(3/10/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2003 0, 2003 REPLY TO ATTN OF: KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-130- Keeler-Tillamook) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler Tillamook 115 kV transmission line from structure 1/7 through structure 58/2, and along adjacent portions of the Keeler-Forest Grove #2 115KV transmission line. In addition the project includes 11miles of the 115KV Timber Tap. Location: The project is located in the BPA Eugene Region, Tillamook and Washington Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-

178

Coordination of Transmission Line Transfer Capabilities  

E-Print Network (OSTI)

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

179

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

180

Video transmission over wireless networks  

E-Print Network (OSTI)

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

182

National Transmission Grid Study: 2002  

Energy.gov (U.S. Department of Energy (DOE))

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

183

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

184

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

185

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

186

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

187

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

188

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

189

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

190

2006 National Electric Transmission Congestion Study Federal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

191

National Electric Transmission Congestion Study | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

192

2009 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

193

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

194

2006 National Electric Transmission Congestion Study | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

195

National Electric Transmission Congestion Study Workshops | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

196

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

197

Agenda: Electricity Transmission and Distribution - East | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

198

Agenda: Electricity Transmission, Storage and Distribution -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

199

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

200

Directly correlated transmission electron microscopy and atom...  

NLE Websites -- All DOE Office Websites (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Growth of Pseudomonas aeruginosa in tap water in relation to utilization of substrates at concentrations of a few micrograms per liter.  

Science Journals Connector (OSTI)

...concentration of assimilable organic carbon (AOC) available for strain P1525 varied from...C has been obtained (28). Hence, the AOC available for strain P17 varied from 1...rate in the types of tap water tested. The AOC concentration available for P. aeruginosa...

D van der Kooij; J P Oranje; W A Hijnen

1982-11-01T23:59:59.000Z

202

A 10.9 GS/s, 64 Taps Distributed Waveform Generator with DAC-Assisted Current-Steering Pulse Generators in  

E-Print Network (OSTI)

A 10.9 GS/s, 64 Taps Distributed Waveform Generator with DAC-Assisted Current-Steering Pulse Generators in ¢¡¤£¦¥¨§© Digital CMOS Yunliang Zhu , Jonathan D. Zuegel , John R. Marciante , and Hui Wu, Email:hwu@ece.rochester.edu Abstract-- A distributed waveform generator (DWG) with DAC-assisted pulse

Wu, Hui

203

Career Map: Power Systems/Transmission Engineer  

Energy.gov (U.S. Department of Energy (DOE))

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

204

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

205

Transmission Lines Emulating Moving Media  

E-Print Network (OSTI)

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

206

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

207

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network (OSTI)

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

208

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network (OSTI)

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

209

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

210

Power Transmission, Distribution and Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

211

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

212

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

213

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

214

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

215

Recovery Act Interconnection Transmission Planning  

Energy.gov (U.S. Department of Energy (DOE))

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

216

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

217

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

218

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

219

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

220

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

222

MagLab - Transmission Lines Tutorial  

NLE Websites -- All DOE Office Websites (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

223

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

224

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

225

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

226

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

227

Mountain States Transmission Intertie (MSTI) Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

228

Sandia National Laboratories: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

229

Integrated Transmission and Distribution Control  

SciTech Connect

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

230

BPA, Electric Transmission Overview, October 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

231

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

232

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network (OSTI)

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

233

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers (EERE)

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

234

Western-UGP Transmission and Ancillary Services Rates Customer...  

NLE Websites -- All DOE Office Websites (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

235

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

236

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

237

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

238

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

239

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

240

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Relativistic tunneling and accelerated transmission  

E-Print Network (OSTI)

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

242

FPL's Christmas 1991 transmission outages  

SciTech Connect

A record number of contamination related outages occurred on FPL transmission lines during Christmas of 1991 and resulted in an investigation of inservice insulator performance. The field investigation process used was enhanced by recent improvements in outage data recording. Also used in the analysis were weather information, the results of recently completed accelerated aging tests of polymers, and specially conducted tests on the effects of weathering steel stain on porcelain insulators. Specific insulator problems were identified and actions taken to reduce the possibility of recurrence.

Burnham, J.T.; Busch, D.W.; Renowden, J.D. (Florida Power Light Co., Juno Beach, FL (United States). Transmission Line Dept.)

1993-10-01T23:59:59.000Z

243

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

244

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

245

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

246

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

247

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

248

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network (OSTI)

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

249

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

250

MTS7182.TAP  

E-Print Network (OSTI)

... 221 BLUE : 222 ENERGY : 223 PANICKY : 224 HOPELESS : 225 RELAXED ... ,SAW RELIGIOUS ADVISOR LAST 3 MO : 340 VAR LABEL SEESPRX ,SAW .... 547 PROCCUP (1)FARM : 548 (2)UNSKILLED : 549 (3)SEMISKILLED : 550 ...

251

Tapping the Mind  

Science Journals Connector (OSTI)

...environmental-control devices, and smart wheelchairs. The...thousands stand to benefit from BCI technologies...Farwell devised a grid containing the letters...stand-in for a smart wheelchair. They...environmental-control devices, and smart wheelchairs...thousands stand to benefit from...

Ingrid Wickelgren

2003-01-24T23:59:59.000Z

252

Tap Geothermal Heat  

Science Journals Connector (OSTI)

Central to the proposal is the detonation of an underground thermonuclear device to create a large subterranean cavity of crushed rock in an area of geothermal activity. ...

1969-12-15T23:59:59.000Z

253

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network (OSTI)

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

254

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

255

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

256

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

257

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

258

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

259

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

260

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Transmission Electron Microscope and Scanning Electron Microscopes -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

262

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

263

NREL: Transmission Grid Integration - Research Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

264

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

265

Richard Shaheen named Senior VP of Transmission  

NLE Websites -- All DOE Office Websites (Extended Search)

and operational accomplishments that will serve BPA well as we continue to strengthen our safety culture, sustain our core transmission assets and modernize our electric grid."...

266

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

267

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network (OSTI)

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the… (more)

Malathi, V

2014-01-01T23:59:59.000Z

268

Big Bend-Witten Transmission Line Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

269

Natural Gas Transmission and Distribution Module  

U.S. Energy Information Administration (EIA) Indexed Site

31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT...

270

Detonator comprising a nonlinear transmission line  

DOE Patents (OSTI)

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

271

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

272

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

273

Nevada Transmission Siting Information | Open Energy Information  

Open Energy Info (EERE)

Siting Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting...

274

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

275

Webinar: Understanding the Interconnection and Transmission Service...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tribal Energy Sufficiency and Economic Development U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S....

276

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

NLE Websites -- All DOE Office Websites (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

277

Electricity Transmission, A Primer | Open Energy Information  

Open Energy Info (EERE)

A Primer Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State...

278

SunZia Southwest Transmission Project Comments  

Energy Savers (EERE)

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

279

Williston to Stateline Transmission Line Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

280

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers (EERE)

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Grand Coulee Transmission Line Replacement Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

282

Crews repair transmission lines after Washington wildfire  

NLE Websites -- All DOE Office Websites (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

283

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

284

Final Report Navajo Transmission Project (NTP)  

SciTech Connect

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

285

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

286

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

287

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

288

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

289

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

290

Electric Transmission Line Flashover Prediction System  

E-Print Network (OSTI)

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

291

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

292

Marketing Plan for Transmission Planning Services  

E-Print Network (OSTI)

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

293

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network (OSTI)

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

294

Physics of information representation, transmission and processing  

Science Journals Connector (OSTI)

The paper presents the theory of physical model of information representation, transmission and processing together with their features which yield into introduction of classical and quantum informatics principles. These features are mathematically described ... Keywords: information physics, information representation, quantum informatics, transmission and processing

Miroslav Svítek

2009-11-01T23:59:59.000Z

295

Ecological benefits of dc power transmission  

SciTech Connect

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

296

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network (OSTI)

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

297

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

298

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

299

CRSP Transmission Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

300

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

302

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

303

Electricity Transmission Pricing: How Contracts Must Reflect Costs  

Science Journals Connector (OSTI)

This article sets out the main design elements of contracts for use of a transmission system and the basic methods of transmission pricing. It considers two methods of pricing transmission: “top-down” and “bot...

Graham Shuttleworth

1996-01-01T23:59:59.000Z

304

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network (OSTI)

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

305

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network (OSTI)

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

306

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network (OSTI)

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

307

Virulence, parasite mode of transmission, and host fluctuating asymmetry  

Science Journals Connector (OSTI)

...they provide a potential route for vertical transmission (Hembree & Ryan 1982...the horizontalvertical transmission sequence. Dashed lines indicate the horizontal...aeg pti depends on the transmission route of its parasite Edha ardia...

1997-01-01T23:59:59.000Z

308

Introduction. Cultural transmission and the evolution of human behaviour  

Science Journals Connector (OSTI)

...some promising lines of development...learning|cultural transmission|cultural evolution...illustration of cultural transmission delivering improved...efficient over transmission events, in line with the notion...two different routes: repeated interaction...

2008-01-01T23:59:59.000Z

309

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

310

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

311

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

312

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel...

313

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a...

314

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

315

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

316

2014 Transmission Reliability Program Peer Review  

Energy.gov (U.S. Department of Energy (DOE))

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

317

RAPID/Geothermal/Transmission Siting & Interconnection | Open...  

Open Energy Info (EERE)

in California California Energy Commission, California Energy Commission In California, transmission lines set to operate with a voltage between 50 kV and 200 kV must...

318

Transmission Policy in the United States  

E-Print Network (OSTI)

Market Design (SMD) proposal. PJM’s market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC’s RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

319

National Electric Transmission Congestion Studies | Department...  

Energy Savers (EERE)

of the line or by operational directives that are created and enforced to protect the security and reliability of the grid. The term "transmission constraint" can refer to a...

320

National Electric Transmission Congestion Study- Portland Workshop  

Energy.gov (U.S. Department of Energy (DOE))

On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below.

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Executive Forum on Solutions to Transmission Investment  

E-Print Network (OSTI)

d'Hydro-Québec (IREQ) ISO New England Korea Electric Power Research Institute Michigan Electric. Business and Economics Small Groups ........................................................10 B. Planning and Transmission Investment Policy Small Groups ......................10 C. Technology Small Groups

322

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC line from West Texas to DallasFort...

323

Neuromotor Transmissibility of Horizontal Seatpan Vibration  

E-Print Network (OSTI)

Exposure to occupational whole body vibration (WBV) is associated with low back pain disorders, musculoskeletal disorders, and degeneration of spine. Transmission of vibration to the neuromotor system may play a role in the etiology...

Channamallu, Raghu Ram

2007-12-16T23:59:59.000Z

324

Data transmission element for downhole drilling components  

DOE Patents (OSTI)

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

325

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

326

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network (OSTI)

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

327

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

328

Electric Power Generation and Transmission (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

329

1 Introduction Danish transmission system operator  

E-Print Network (OSTI)

a new 400 kV transmission line between the cities Aarhus and Aalborg, app 90 km. This line at the 150 kV transmission level and intended to be used at 400 kV more than just for this line. Can of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished

Bak, Claus Leth

330

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

331

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

332

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

333

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

334

RAPID/BulkTransmission/General Construction | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionGeneral Construction < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit...

335

QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...  

Energy Savers (EERE)

Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

336

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

337

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

338

In-situ Transmission Electron Microscopy and Spectroscopy Studies...  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

339

QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

340

RAPID/BulkTransmission/Land Access | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us RAPID Bulk Transmission Land Access Regulatory...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Energy.gov (U.S. Department of Energy (DOE))

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

342

2006 National Electric Transmission Congestion Study and Related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

343

Draft National Electric Transmission Congestion Study Now Available...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

344

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

345

RAPID/BulkTransmission/Siting/New Mexico | Open Energy Information  

Open Energy Info (EERE)

Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting New Mexico Bulk Transmission Siting in New Mexico Regulatory Information Overviews Search for...

346

RAPID/BulkTransmission/Siting/California | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting California Bulk...

347

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Pipping of GH2 Pipeline....

348

RAPID/BulkTransmission/Air Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

349

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

do not have siting authority for transmission facilities. Print PDF Retrieved from "http:en.openei.orgwindex.php?titleCaliforniaTransmissionLocalRegulations&oldid68832...

350

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers (EERE)

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

351

RAPID/Overview/BulkTransmission/Siting/Colorado | Open Energy...  

Open Energy Info (EERE)

Colorado < RAPID | Overview | BulkTransmission | Siting(Redirected from RAPIDAtlasBulkTransmissionSitingColorado) Redirect page Jump to: navigation, search REDIRECT...

352

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Enviromental Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search...

353

Steps to Establish a Real-Time Transmission Monitoring System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that must be taken to establish a system to make available to all transmission owners and Regional Transmission Organizations (RTOs) within the Eastern and Western Interconnections...

354

QER Public Meeting in Portland, OR: Electricity Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

355

QER Public Meeting in Newark, NJ: Electricity Transmission and...  

Energy Savers (EERE)

Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

356

Transmission Reliability "Load as a Resource" Peer Review Materials...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Reliability "Load as a Resource" Peer Review Materials Now Available Transmission Reliability "Load as a Resource" Peer Review Materials Now Available September 25,...

357

An Introduction to Electric Power Transmission | Open Energy...  

Open Energy Info (EERE)

An Introduction to Electric Power Transmission Abstract An introduction to transmission lines including topics: electricity generation and delivery, ownership and funding, anatomy...

358

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

359

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

360

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers (EERE)

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers (EERE)

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

362

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

363

EA-1982: Parker-Davis Transmission System Programmatic Operations...  

Energy Savers (EERE)

on Western's Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance...

364

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

365

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

366

RAPID/BulkTransmission/Water Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionWater Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

367

RAPID/BulkTransmission/Water Use | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionWater Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk...

368

BPA, Transmission, I-5 Corridor Project, data by segments and...  

NLE Websites -- All DOE Office Websites (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

369

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

370

RAPID/BulkTransmission/Power Plant | Open Energy Information  

Open Energy Info (EERE)

BulkTransmissionPower Plant < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk...

371

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

372

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50411 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada NREL Technical Monitor: David Corbus

373

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

374

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Planning (Xcel). 2006. Wind Integration Study Report OfTransmission Vision for Wind Integration. White Paper.Charles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

375

Abstract --The need to determine adequate regulations in the transmission activity in deregulated environments does not  

E-Print Network (OSTI)

be followed. Index Terms--Transmission expansion, Transmission planning, Transmission systems, Transmission pricing, Open access. I INTRODUCTION he presence of economies of scale and the specificity

Dixon, Juan

376

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions- Dataset  

Energy.gov (U.S. Department of Energy (DOE))

Excel file with dataset for Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

377

A FRAMEWORK FOR TRANSMISSION CONGESTION MANAGEMENT ANALYSIS MINGHAI LIU  

E-Print Network (OSTI)

markets introduces uncertainty in the LMPs and consequently, in transmission pricing. In order to protect

Gross, George

378

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

379

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

380

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Idaho/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Idaho/Transmission < Idaho Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Idaho is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). It includes the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.

382

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

383

2012 National Electric Transmission Congestion Study - Philadelphia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

384

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

385

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

386

Washington/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Washington/Transmission < Washington Jump to: navigation, search WashingtonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Washington is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

387

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

388

Transmission Infrastructure: FERCs Role  

U.S. Energy Information Administration (EIA) Indexed Site

Transmission Incentives Transmission Incentives Transmission Incentives P. Kumar Agarwal P. Kumar Agarwal Acting Director, Division of Reliability & Acting Director, Division of Reliability & Engineering Services Engineering Services Federal Energy Regulatory Commission Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference 2009 Energy Conference Washington, DC Washington, DC April 7, 2009 April 7, 2009 2 2 History History   Energy Policy Act of 2005, August 5, Energy Policy Act of 2005, August 5, 2005 2005 - - Created FPA Section 219 Created FPA Section 219   FERC issued order No. 679 on July 20, FERC issued order No. 679 on July 20, 2006 adopting regulations to promote 2006 adopting regulations to promote

389

Downhole transmission system comprising a coaxial capacitor  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a plurality of data transmission elements. A coaxial cable having an inner conductor and an outer conductor is disposed within a passage in the downhole component such that at least one capacitor is disposed in the passage and having a first terminal coupled to the inner conductor and a second terminal coupled to the outer conductor. Preferably the transmission element comprises an electrically conducting coil. Preferably, within the passage a connector is adapted to electrically connect the inner conductor of the coaxial cable and the lead wire. The coaxial capacitor may be disposed between and in electrically communication with the connector and the passage. In another embodiment a connector is adapted to electrical connect a first and a second portion of the inner conductor of the coaxial cable and a coaxial capacitor is in electrical communication with the connector and the passage.

Hall, David R. (Provo, UT); Pixton, David S. (Lehi, UT); Johnson, Monte L. (Orem, UT); Bartholomew, David B. (Springville, UT); Hall, Jr., H. Tracy (Provo, UT); Rawle, Michael (Springville, UT)

2011-05-24T23:59:59.000Z

390

Data transmission system with distributed microprocessors  

DOE Patents (OSTI)

A data transmission system having a common request line and a special request line in addition to a transmission line. The special request line has priority over the common request line. A plurality of node stations are multi-drop connected to the transmission line. Among the node stations, a supervising station is connected to the special request line and takes precedence over other slave stations to become a master station. The master station collects data from the slave stations. The station connected to the common request line can assign a master control function to any station requesting to be assigned the master control function within a short period of time. Each station has an auto response control circuit. The master station automatically collects data by the auto response controlling circuit independently of the microprocessors of the slave stations.

Nambu, Shigeo (Fuchu, JP)

1985-01-01T23:59:59.000Z

391

A transmission calibration method for superconducting resonators  

E-Print Network (OSTI)

A method is proposed and experimentally explored for \\textit{in-situ} calibration of complex transmission data for superconducting microwave resonators. This cryogenic calibration method accounts for the instrumental transmission response between the vector network analyzer reference plane and the device calibration plane. Once calibrated, the observed resonator response was modeled in detail by two approaches. The first, a phenomenological model based on physically realizable rational functions, enables the extraction of multiple resonance frequencies and widths for coupled resonators without explicit specification of the circuit network. In the second, an ABCD-matrix representation for the distributed transmission line circuit is used to model the observed response from the characteristic impedance and propagation constant. When used in conjunction with electromagnetic simulations, the kinetic inductance fraction can be determined with this method with an accuracy of 2%. Datasets for superconducting microst...

Cataldo, Giuseppe; Barrentine, Emily M; Brown, Ari D; Moseley, Samuel H; U-Yen, Kongpop

2014-01-01T23:59:59.000Z

392

Single transmission line data acquisition system  

DOE Patents (OSTI)

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

393

Transmission/Nepa Database | Open Energy Information  

Open Energy Info (EERE)

Nepa Database Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Document Collections (1) Have a NEPA Document Collection to add that doesn't yet exist in this collection? Make sure it doesn't already exist: Please be sure to search this page by serial number and by document number Add.png Add a new NEPA Document Collection This query has been included to allow you to use the black arrows in the table header cells to sort the table data. Document Name Serial Number Analysis Type Transmission Type Project Area Applicant Lead Agency District Office Project Phase(s) TransWest EIS 600kV Wyoming Western Power Administration BLM BLM Wyoming State Office

394

Oregon/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Oregon/Transmission < Oregon Jump to: navigation, search OregonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Idaho is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

395

Utah/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Utah/Transmission < Utah Jump to: navigation, search UtahTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Utah is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC includes the provinces of Alberta and British Columbia, the northern portion of Baja California, Mexico, and all or portions of the 14 Western states between.

396

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

397

Definition: Advanced Transmission Applications | Open Energy Information  

Open Energy Info (EERE)

Applications Applications Jump to: navigation, search Dictionary.png Advanced Transmission Applications Software that utilizes synchrophasor information for real-time grid operations or planning and off-line analysis. These applications are aimed at providing wide-area situational awareness, grid monitoring, and detailed power system analysis and the improvement or validation of power system models.[1] Related Terms smart grid References ↑ https://www.smartgrid.gov/category/technology/advanced_transmission_applications [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssustainability, |Template:BASEPAGENAME]]sustainability, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Advanced_Transmission_Applications&oldid=502495

398

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 20, 2003 February 20, 2003 EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program February 19, 2003 EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-125: Supplement Analysis Transmission System Vegetation Management Program February 18, 2003 EIS-0285-SA-124: Supplement Analysis Transmission System Vegetation Management Program February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 16, 2003 EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program December 24, 2002

399

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Transmission_Company_LLC_Smart_Grid_Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

400

EIS-0285: Transmission System Vegetation Management Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 19, 2002 July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 9, 2002 EIS-0285-SA-81: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-80: Supplement Analysis Transmission System Vegetation Management Program July 1, 2002 EIS-0285-SA-78: Supplement Analysis Transmission System Vegetation Management Program June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability Technology Solutions (CERTS) surveyed the current state of transmission congestion around the nation. Transmission Bottleneck Project Report. March 19, 2003 More Documents & Publications Electricity Transmission Congestion Costs: A Review of Recent Reports 2012 National Electric Transmission Congestion Study: Preliminary Findings

402

Electric Transmission Lines (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

403

Synchronized Andreev transmission in SNS junction arrays.  

SciTech Connect

We construct a nonequilibrium theory for the charge transfer through a diffusive array of alternating normal (N) and superconducting (S) islands comprising an SNSNS junction, with the size of the central S island being smaller than the energy relaxation length. We demonstrate that in the nonequilibrium regime the central island acts as Andreev retransmitter with the Andreev conversions at both NS interfaces of the central island correlated via above-the-gap transmission and Andreev reflection. This results in a synchronized transmission at certain resonant voltages which in experiments is seen as a sequence of spikes in the differential conductivity.

Chtchelkatchev, N. M.; Baturina, T. I.; Glatz, A.; Vinokur, V. M.; Materials Science Division; Russian Academy of Sciences; Moscow Inst. of Physics and Technology; Inst. Semiconductor Physics

2010-07-29T23:59:59.000Z

404

Optimizing Storages for Transmission System Operation  

Science Journals Connector (OSTI)

Abstract A growing amount of congestions is expected for future operation of electrical transmission grids in Europe. Within this context, storages can be used to assist transmission system operators in daily operation and to avoid costly redispatch measures. In this paper, a research methodology to evaluate impact and interdependencies between market operation of storages and participation in redispatch measures is presented. Furthermore, a methodology for the evaluation of benefits by storages solely administrated by TSO is introduced. The methods are evaluated in a case study for the German electricity system in the year 2020.

Jonas Eickmann; Tim Drees; Jens D. Sprey; Albert Moser

2014-01-01T23:59:59.000Z

405

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

406

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor of

Mills, Andrew D

2011-01-01T23:59:59.000Z

407

Transmission grid access and pricing in Norway, Spain, and California: A comparative study  

E-Print Network (OSTI)

incentives given by transmission pricing form the foundationhas focussed on transmission pricing, monopoly regulation,

Gronli, Helle; Gomez San Ramon, Tomas; Marnay, Chris

1999-01-01T23:59:59.000Z

408

Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Midwest Independent Transmission System Operator  

Energy.gov (U.S. Department of Energy (DOE))

Supplemental comments of the Midwest Independent Transmission System Operaton on the application from International Transmission Company to construct, operate, and maintain electric transmission...

409

A neutron transmission study of environmental Gd  

E-Print Network (OSTI)

A new method for the determination of environmental Gd by neutron transmission (NT) experiments is proposed. The NT method is based on the measurements of neutron spectra passing through a target. From the attenuation neutron spectra new data as concentration, width, resonance energies and cross section have been obtained.

Cristiana Oprea; Ioan Alexandru Oprea; Alexandru Mihul

2014-06-02T23:59:59.000Z

410

How Financial Transmission Rights Curb Market Power  

E-Print Network (OSTI)

PWP-049 How Financial Transmission Rights Curb Market Power Steven Stoft June 1997 This paper is part of the working papers series of the Program on Workable Energy Regulation (POWER). POWER is a program of the University of California Energy Institute, a multicampus research unit of the University

California at Berkeley. University of

411

Methods and systems for micro transmissions  

DOE Patents (OSTI)

Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

Stalford, Harold L

2014-12-23T23:59:59.000Z

412

Transmission line environmental assessment guidance document  

SciTech Connect

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

413

Efficient Spectral Methods for Transmission Eigenvalues and ...  

E-Print Network (OSTI)

Mar 20, 2014 ... scattering obstacle can be recovered by using the measured scattering data and the ... method reduces the problem to a sequence of one-dimensional transmission eigenvalue ...... Next, we define the following interface basis functions ... problem can be efficiently solved by using a standard procedure [10].

2014-03-24T23:59:59.000Z

414

A numerical tool for transmission lines  

Science Journals Connector (OSTI)

The electric line numerical study is usually made through a harmonic approach with the impedance concept based on the Finite Difference discretization in both the time and space domains. These methods present severe drawbacks when used in impulse working ... Keywords: differential system, finite element method, impulse voltage, stiff time problem, transmission line

Hervé Bolvin; André Chambarel; Philippe Neveux

2005-05-01T23:59:59.000Z

415

1 Introduction Danish transmission system operator  

E-Print Network (OSTI)

400 kV transmission line between the cities Aarhus and Aalborg, app. 90 km. This line is constructed reactor compensated 400 kV combined cable/overhead line. This is accomplished by means of theoretical-phase autoreclosure ARC in such a combined cable/OHL line. Keywords -- 400 kV cable, single-phase autoreclosure, shunt

Bak, Claus Leth

416

HVDC transmission: a path to the future?  

SciTech Connect

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

417

Definition: Transmission Angle and Frequency Monitoring | Open Energy  

Open Energy Info (EERE)

Transmission Angle and Frequency Monitoring Transmission Angle and Frequency Monitoring Jump to: navigation, search Dictionary.png Transmission Angle and Frequency Monitoring An advanced transmission application that uses angle and frequency measurements from PMUs to indicate loss of generation or other disturbances causing a change in the supply/demand balance.[1] Related Terms transmission lines, advanced transmission applications, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_angle_and_frequency_monitoring [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like. egory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Angle_and_Frequency_Monitoring&oldid=502506

418

2006 National Electric Transmission Congestion Study and Related Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study and Related 6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints and identifies areas that are transmission-constrained. This is the first Congestion Study the Department conducted. Based on this study, two National Interest Electric Transmission Corridors were designated in 2007. They were invalidated by a federal appeals court in 2011. Comments and form letters were submitted by the public in response to this study. National Electric Transmission Congestion Study 2006 Executive Summary Full Text of the National Electric Transmission Congestion Study 2006

419

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

420

Updating the Electric Grid: An Introduction to Non-Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Updating the Electric Grid: An Introduction to Non-Transmission Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers Throughout the United States a consensus has emerged that an improved transmission system is in the interest of the country as a whole.1 However, decisions to implement new transmission lines may face significant cost, environmental, and public acceptance barriers which delay implementation of needed transmission improvements. As State decision makers consider transmission investments, it may be important to account for Non-Transmission Alternatives (NTA). NTAs are programs and technologies that complement and improve operation of existing transmission systems that individually or in combination defer or eliminate the need for upgrades to

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada Subcontract Report NREL/SR-5500-50414 February 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba Canada

422

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

423

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

of incremental wind development. At the extreme, still otherextreme assumption, the implied unit cost of transmission for windon wind power in their analysis. On one extreme, a number of

Mills, Andrew D.

2009-01-01T23:59:59.000Z

424

Colorado/Transmission/Regulatory Overview | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Regulatory Overview < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Overview Roadmap State Data Regulatory Overview General Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

425

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

426

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

427

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

428

NREL: Transmission Grid Integration - Data and Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Data and Resources Data and Resources NREL offers the following transmission integration-related data and resources. Eastern Wind Dataset A key task of the Eastern Wind Integration and Transmission Study was to develop a dataset of three years of modeled time series wind speed and power. This dataset was designed to help energy professionals perform wind integration studies, compare potential wind sites spatially and temporally, and estimate power production from hypothetical wind plants. Western Wind Dataset A primary task of the Western Wind and Solar Integration Study was to produce a comprehensive dataset that could be used to model the build-out of potential wind plants in the Western United States. This dataset was designed to help energy professionals perform wind integration studies,

429

127 Natural Gas Transmission and Distribution Module  

E-Print Network (OSTI)

and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of the supply options available to bring gas to market centers within each of the NGTDM regions (Figure 9). The major assumptions used within the NGTDM are grouped into four general categories. They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports and exports. A complete listing of NGTDM assumptions and in-depth

Key Assumptions

430

Reinforcing Power Grid Transmission with FACTS Devices  

E-Print Network (OSTI)

We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed into the grid to relieve congestion created by load growth or fluctuations of intermittent renewable generation. We limit our selection of FACTS devices to those that can be represented by modification of the inductance of the transmission lines. Our master optimization problem minimizes the $l_1$ norm of the FACTS-associated inductance correction subject to constraints enforcing that no line of the system exceeds its thermal limit. We develop off-line heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) where at each step the constraints are linearized analytically around the current operating point. The algorithm is accelerated further with a version of the cutting plane method greatly reducing the number of active constraints during the optimization, while checking feasibility of the non-active constraints post...

Frolov, Vladimir; Chertkov, Misha

2013-01-01T23:59:59.000Z

431

Dispersion-free radial transmission lines  

DOE Patents (OSTI)

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

432

Image processing application maps optimal transmission routes  

SciTech Connect

The process of selecting an optimal route for a transmission line is complex as it involves technical, social, economic, environmental, and planning aspects. A new method was developed to help engineers select routes of specific transmission lines. The methodology is based on the use of satellite images of the geographic region in which the line will cross. The selection process searches for the most economical alternative and the one with the least environmental impact within the area of concern. This is achieved by using an image recognition software package and a program that uses minimal path techniques with support of weight restrictions. This article defines the methodology and uses a region of Mexico as an example to illustrate the optimal route-selection process.

Vega, M.; Sarmiento, H.G.

1996-04-01T23:59:59.000Z

433

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

434

Extraordinary optical transmission through patterned subwavelength apertures.  

SciTech Connect

Light propagating through a subwavelength aperture can be dramatically increased by etching a grating in the metal around the hole. Moreover, light that would typically broadly diverge when passing through an unpatterned subwavelength hole can be directed into a narrow beam by utilizing a specific pattern around the aperture. While the increased transmission and narrowed angular emission appear to defy far-field diffraction theory, they are consistent with a fortuitous plasmon/photon coupling. In addition, the coupling between photons and surface plasmons affects the emissivity of a surface comprised of such structures. These properties are useful across several strategic areas of interest to Sandia. A controllable emission spectrum could benefit satellite and military application areas. Photolithography and near-field microscopy are natural applications for a system that controls light beyond the diffraction limit in a manner that is easily parallelizable. Over the one year of this LDRD, we have built or modified the numerical tools necessary to model such structures. These numerical codes and the knowledge base for using them appropriately will be available in the future for modeling work on surface plasmons or other optical modeling at Sandia. Using these tools, we have designed and optimized structures for various transmission or emission properties. We demonstrate the ability to design a metallic skin with an emissivity peak at a pre-determined wavelength in the spectrum. We optimize structures for maximum light transmission and show transmitted beams that beat the far-field diffraction limit.

Kemme, Shanalyn A.; El-Kady, Ihab Fathy; Hadley, G. Ronald; Peters, David William; Lanes, Chris E.

2004-12-01T23:59:59.000Z

435

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

436

2009 National Electric Transmission Congestion Study - Las Vegas Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Las Vegas 2009 National Electric Transmission Congestion Study - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop

437

Electron microscopy and microanalysis Two transmission electron microscopes  

E-Print Network (OSTI)

Electron microscopy and microanalysis Two transmission electron microscopes (TEM) and three scanning electron micro- scopes (SEM) are operated by the De- partment. Attachments for TEM include energy dispersive X-ray spectrometer (EDS), scanning transmission attachment, serial electron energy loss

438

File:08COCStateTransmissionProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

COCStateTransmissionProcess.pdf Jump to: navigation, search File File history File usage Metadata File:08COCStateTransmissionProcess.pdf Size of this preview: 463 599 pixels....

439

Integrating Renewable Energy into the Transmission and Distribution...  

Office of Environmental Management (EM)

Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Integrating Renewable Energy into the Transmission and Distribution System of the U.S....

440

20% Wind Energy by 2030 - Chapter 4: Transmission and Integration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Transmission and Integration into the U.S. Electric System Summary Slides 20% Wind Energy by 2030 - Chapter 4: Transmission and Integration into the U.S. Electric System Summary...

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

RAPID/Geothermal/Transmission Siting & Interconnection/California...  

Open Energy Info (EERE)

Agency: California Energy Commission Transmission Siting In California, transmission lines set to operate with a voltage between 50 kV and 200 kV must obtain a permit to...

442

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network (OSTI)

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

443

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

444

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest...

445

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Energy Savers (EERE)

& Publications Wind Integration, Transmission, and Resource Assessment and Characterization Projects Offshore Wind Projects Testing, Manufacturing, and Component Development...

446

Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008)  

Energy.gov (U.S. Department of Energy (DOE))

Federal Loan Guarantees For Projects That Employ Innovative Energy Efficiency, Renewable Energy, And Advanced Transmission And Distribution Technologies

447

Transmission Constraints and Congestion in the Western and Eastern...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midwest Area Renewable Transmission (SMART) Study. (October 22). https:www.pjm.commediacommittees- groupscommitteesteac2009102220091022-smart-study.ashx. 327....

448

DOE Action Plan Addressing the Electricity Transmission System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

449

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements  

E-Print Network (OSTI)

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements Jiangmeng Zhang}@illinois.edu Abstract--This paper proposes a measurement-based method to assess transmission line loadability a stable operation. Transmission line loading limits are also essential to deter- mine locational marginal

Liberzon, Daniel

450

New approach for modelling distributed MEMS transmission lines  

E-Print Network (OSTI)

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

451

Experimental characterisations of thin film transmission line losses  

E-Print Network (OSTI)

Experimental characterisations of thin film transmission line losses D. Kim, H. Kim and Y. Eo New frequency-variant losses of planar thin film transmission lines are experimentally investigated in a broad frequency range. The fre- quency-variant transmission line parameters are accurately determined

452

A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE  

E-Print Network (OSTI)

I I I I 1388 A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE S. M. Anlage, H line. The device makes use of the change in kinetic inductance of a superconducting transmission line, fabrication of transmission lines with such films provides the means for constructing a continuously variable

Anlage, Steven

453

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

454

State transmission infrastructure authorities: the story so far  

SciTech Connect

State transmission infrastructure authorities offer a new tool for helping to overcome such obstacles to developing transmission as high capital investment requirements, uncertain cost allocation among multiple parties, and siting and permitting challenges. Yet to be determined is whether they can help stimulate large, multi-state regional transmission projects. (author)

Porter, Kevin; Fink, Sari

2009-03-15T23:59:59.000Z

455

TRANSMISSION ELECTRON MICROSCOPY OF WEAKLY DEFORMED ALKALI HALIDE CRYSTALS  

E-Print Network (OSTI)

377 TRANSMISSION ELECTRON MICROSCOPY OF WEAKLY DEFORMED ALKALI HALIDE CRYSTALS H. STRUNK Max'importance croissante du durcissement de la solution solide. Abstract. 2014 Transmission electron microscopy (TEM Abstracts 7j66 - 7 I' 1. Introduction. - It is only some years ago that transmission electron microscopy

Boyer, Edmond

456

Queue Prediction: an efficient scheduler for fast ATM cell transmission  

E-Print Network (OSTI)

Queue Prediction: an efficient scheduler for fast ATM cell transmission Peter Fenwick Department, if not impossible within the time constraints of fast ATM transmission (622 Mbps or higher). This paper presents a solution to this problem. By scheduling in advance the transmissions from queues it allows all output

Fenwick, Peter

457

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits  

E-Print Network (OSTI)

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits Mohammad D. Al to transmission line circuit problems based on the longitudinal partitioning into segments. This greatly improves the convergence for strongly coupled RLCG transmission line (TL) type circuits. The method can be applied to other

Gander, Martin J.

458

Using Transmission Lines for Global On-Chip Communication  

E-Print Network (OSTI)

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

459

Transmission Line Boundary Protection Using Wavelet Transform and Neural Network  

E-Print Network (OSTI)

1 Transmission Line Boundary Protection Using Wavelet Transform and Neural Network Nan Zhang of transmission line protection are: a) differentiating precisely the internal faults from external, and b is verified using frequency-dependent transmission line model and the test results prove its enhanced

460

EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED  

E-Print Network (OSTI)

1 EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED ENHANCED PER introduces a modified enhanced transmission-line theory to account for higher-order modes while using a standard transmission line equation solver or equivalently a Baum, Liu and Tesche (BLT) equation solver

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Asymmetric parametric amplification in nonlinear left-handed transmission lines  

E-Print Network (OSTI)

Asymmetric parametric amplification in nonlinear left-handed transmission lines David A. Powell amplification in nonlinear left-handed transmission lines, which serve as model systems for nonlinear negative-handed regime. © 2009 American Institute of Physics. DOI: 10.1063/1.3089842 Left-handed transmission lines

462

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING  

E-Print Network (OSTI)

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING SYNCHRONIZED SAMPLING Nan Zhang Mladen 77843-3128, U.S.A. Abstract: A complete fault analysis scheme for long transmission line represented fault analysis tool for transmission lines is very useful for on-line confirmation and off-line trouble

463

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network (OSTI)

by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland unscheduled electricity flows over transmission lines leading to increased risks to electric systemBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

464

Social encounter networks: collective properties and disease transmission  

Science Journals Connector (OSTI)

...effective at reducing transmission [7,8]. Such distributions...dPlN, blue dashed line in figure-1 c) allows...the highest levels of transmission, while the heterogeneity...that 90 per cent of transmission is to the 40 per cent...due to the multiple routes via which infected people...

2012-01-01T23:59:59.000Z

465

Experimental Transmission of Canine Malignant Lymphoma to the Beagle Neonate  

Science Journals Connector (OSTI)

...investigating HHV-8 familial transmission with both HHV-8 serologic...saliva being a major route of HHV-8 contamination...titers could influence transmission within family. Together...existence of heterosexual transmission but supports the hypothesis...with the KS-1 cell line (33) . Bars, 95...

Thomas J. Kakuk; Ronald W. Hinz; Robert F. Langham; and Gabel H. Conner

1968-04-01T23:59:59.000Z

466

Evolutionary bi-stability in pathogen transmission mode  

Science Journals Connector (OSTI)

...the horizontal transmission route is given by R 0...horizontal to vertical transmission than the data grouped around the upper line. Two initial hypotheses...horizontal to vertical transmission; that is, at...index, x (upper line, B, in figure-3...

2010-01-01T23:59:59.000Z

467

Feed-borne transmission and case clustering of BSE  

Science Journals Connector (OSTI)

...analysis of feed-borne transmission at the herd level and...cannot. Keywords: BSE; transmission dynamics; clustering...1997). The dominant route of BSE infection in...o al, with maternal transmission having been shown to...dotted and dashed lines), the di erence with...

2000-01-01T23:59:59.000Z

468

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network (OSTI)

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Wiser, Ryan

2014-01-01T23:59:59.000Z

469

Transmission Line Structure Spotting and Optimization within a Defined Transmission Line Routing Centerline Using Non-Linear Programming Models  

E-Print Network (OSTI)

and optimize structure heights for overhead transmission lines. The modeling tool will address common problems in determining overhead transmission line structure heights and locations. Some of the common problems consist of structure locations often having...

Cockrum, Joshua W.

2010-05-14T23:59:59.000Z

470

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

nearest transmission system substation, and are derived fromthe nearest transmission substation, the capacity factor ofor above) transmission substation. Capital costs vary for

Mills, Andrew

2010-01-01T23:59:59.000Z

471

Public Comments on the National Electric Transmission Congestion Study 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on the National Electric Transmission Congestion Comments on the National Electric Transmission Congestion Study 2012 Public Comments on the National Electric Transmission Congestion Study 2012 The Department issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. DOE requested comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. The following public comments were received as of March 30, 2012, in response to the 2012 study. DOE appreciates the comments that various individuals and organizations submitted. Comments were received from these organizations, listed alphabetically.

472

Arizona/Transmission/Agency Links | Open Energy Information  

Open Energy Info (EERE)

Arizona/Transmission/Agency Links Arizona/Transmission/Agency Links < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Agency Links Arizona Department of Environmental Quality Arizona State Land Department Arizona Game and Fish Department Arizona State Historic Preservation Office Arizona Department of Transportation Arizona Department of Agriculture Arizona Department of Water Resources Central Arizona Water Conservation District Arizona State Parks Arizona Governor's Office of Energy Policy Arizona Corporation Commission (ACC) - Utility Division

473

Natural Gas Transmission Pipeline Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) Natural Gas Transmission Pipeline Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas transmission pipelines. The Act intends to achieve a reasonable balance between the need for the natural

474

Colorado/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Local Regulations Colorado/Transmission/Local Regulations < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process Under state law, Colorado counties and municipalities are given broad authority to plan for and regulate the use of land within their jurisdictions.[1] State statutes give local governments (counties and municipalities) the authorization to; Appoint planning commissions [2] which are required to prepare and adopt master plans or comprehensive plans for physical development within

475

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

476

Designation of National Interest Electric Transmission Bottlenecks (NIETB)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Comments Summary of Comments Designation of National Interest Electric Transmission Bottlenecks (NIETB) Summary of Comments The US Department of Energy (DOE) issued a Federal Register Notice of Inquiry [FR doc. 04-16724] on July 22, 2004, which solicited comments related to the Designation of National Interest Transmission Bottlenecks (NIETB). The 60-day comment period ended on September 21, 2004. Forty-seven comments were received in response to the Notice of Inquiry. Designation of National Interest Electric Transmission Bottlenecks (NIETB) Summary of Comments More Documents & Publications Comments to the Designation of National Interest Transmission Bottlenecks (NIETB) Notice of Inquiry Designation of National Interest Electric Transmission Bottlenecks (NIETB)

477

Ponderomotive phase plate for transmission electron microscopes  

DOE Patents (OSTI)

A ponderomotive phase plate system and method for controllably producing highly tunable phase contrast transfer functions in a transmission electron microscope (TEM) for high resolution and biological phase contrast imaging. The system and method includes a laser source and a beam transport system to produce a focused laser crossover as a phase plate, so that a ponderomotive potential of the focused laser crossover produces a scattering-angle-dependent phase shift in the electrons of the post-sample electron beam corresponding to a desired phase contrast transfer function.

Reed, Bryan W. (Livermore, CA)

2012-07-10T23:59:59.000Z

478

Transmission line including support means with barriers  

DOE Patents (OSTI)

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

479

Transmission line route selection by goal programming  

Science Journals Connector (OSTI)

A two-stage solution for transmission line route selection is presented. The generalized double-sweep method has been used to select the K least costly routes. The selected routes are subjected to social and environmental constraints (SEC). The SEC problem is formulated as a zero-one goal-programming model and solved by the implicit enumeration method. The two-stage solution algorithm has been applied to two problems. The results indicate the suitability of the method for route selection provided that acceptable SEC criteria can be found. The results also indicate the viability of the goal-programming technique for choosing power network interconnection concepts.

I.M. Elamin; S.O. Duffuaa; H.A. Yassein

1990-01-01T23:59:59.000Z

480

2006 National Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 National Electric Transmission Congestion Study 6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. Based on these studies, and comments concerning them from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor). Based on the 2006 study, two National Interest Electric Transmission Corridors were designated in 2007. These were invalidated by a federal appeals court in

Note: This page contains sample records for the topic "tap 69-kv transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

482

Idaho/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Local Regulations Idaho/Transmission/Local Regulations < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process The typical siting process for a transmission line in Idaho will fall to the local units of government in the form of local siting permits, because NIETCs are lacking within Idaho. Chapter 65, Title 67 of Idaho Code extends authority to the counties to include transmission corridors in their comprehensive plans and provides ordinance authority and processes for granting such permits. When the siting process falls to the county level,

483

PP-369 British Columbia Transmission Corporation and British Columbia Hydro  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PP-369 British Columbia Transmission Corporation and British PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Presidential Permit authorizing British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate,a dn maintain electric transmission facilities at the U.S. - Canada Border. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority More Documents & Publications PP-369 British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority Application to Amend Presidential Permit OE Docket No. PP-022-4 British

484

Generation and Transmission Maximization Model | Open Energy Information  

Open Energy Info (EERE)

Generation and Transmission Maximization Model Generation and Transmission Maximization Model Jump to: navigation, search Tool Summary Name: Generation and Transmission Maximization Model Agency/Company /Organization: Argonne National Laboratory Sector: Energy Topics: Pathways analysis Resource Type: Software/modeling tools User Interface: Desktop Application Website: www.dis.anl.gov/projects/Gtmax.html Cost: Paid Generation and Transmission Maximization Model Screenshot References: Generation and Transmission Maximization Model [1] Logo: Generation and Transmission Maximization Model The GTMax model helps researchers study complex marketing and system operational issues. With the aid of this comprehensive model, utility operators and managers can maximize the value of the electric system, taking into account not only its limited energy and transmission resources,

485

Method for bonding a transmission line to a downhole tool  

DOE Patents (OSTI)

An apparatus for bonding a transmission line to the central bore of a downhole tool includes a pre-formed interface for bonding a transmission line to the inside diameter of a downhole tool. The pre-formed interface includes a first surface that substantially conforms to the outside contour of a transmission line and a second surface that substantially conforms to the inside diameter of a downhole tool. In another aspect of the invention, a method for bonding a transmission line to the inside diameter of a downhole tool includes positioning a transmission line near the inside wall of a downhole tool and placing a mold near the transmission line and the inside wall. The method further includes injecting a bonding material into the mold and curing the bonding material such that the bonding material bonds the transmission line to the inside wall.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2007-11-06T23:59:59.000Z

486

Category:Smart Grid Projects - Electric Transmission Systems | Open Energy  

Open Energy Info (EERE)

Transmission Systems category. Transmission Systems category. Pages in category "Smart Grid Projects - Electric Transmission Systems" The following 10 pages are in this category, out of 10 total. A American Transmission Company LLC II Smart Grid Project American Transmission Company LLC Smart Grid Project D Duke Energy Carolinas, LLC Smart Grid Project E Entergy Services, Inc. Smart Grid Project I ISO New England, Incorporated Smart Grid Project M Midwest Energy Inc. Smart Grid Project Midwest Independent Transmission System Operator Smart Grid Project N New York Independent System Operator, Inc. Smart Grid Project P PJM Interconnection, LLC Smart Grid Project W Western Electricity Coordinating Council Smart Grid Project Retrieved from "http://en.openei.org/w/index.php?title=Category:Smart_Grid_Projects_-_Electric_Transmission_Systems&oldid=214227

487

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

488

GRR/Section 8 - Transmission Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 8 - Transmission Overview GRR/Section 8 - Transmission Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 8 - Transmission Overview 08 - TransmissionOverview.pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Regulations & Policies FERC Order No. 2003 FERC Order No. 2006 Triggers None specified Click "Edit With Form" above to add content 08 - TransmissionOverview.pdf 08 - TransmissionOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The siting of an individual project can have a major impact on transmission and interconnection. 8.1 - Will the Power Plant Developer Negotiate an Interconnection

489

Tapping the Earth's geothermal energy  

Energy.gov (U.S. Department of Energy (DOE))

During this oil crisis, we've been searching for alternatives like wind, solar and even tidal power. But on Tuesday, officials from the federal government were in Lake County checking out a natural wonder -- an underground source of energy.

490

TAPS Atigun 3Rs project  

SciTech Connect

This paper reports that Alyeska Pipeline Service Co. is managing a comprehensive corrosion monitoring and repair program for the Trans Alaska Pipeline System as it has since pipeline operations began in 1977. The company has recently initiated the largest corrosion project to date, the Atigun Floodplain Pipe Replacement Project. Three major goals of the pipe replacement project are to: Complete the work with the least environmental impact. Incorporate changes in design and procedures to reduce future corrosion and Accomplish the repair with minimum impact on pipeline throughput. The project team consulted with environmental agencies at the outset to ensure compliance with all requisite regulation, and obtained 35 permits. Environmental protection will continue as a major goal throughout the duration of the project.

Starratt, P.F. (Alyeska Pipeline Service Co., Anchorage, AK (US))

1992-03-01T23:59:59.000Z

491

Tapping the Earth's Natural Heat  

SciTech Connect

This is a very good survey of geothermal energy resources and technologies, particularly from a broad geological point of view. There are many maps and diagrams of some of the most interesting North American geothermal resource sites and prospects. Overall, this provides a very good introduction to the diversity of origins and configurations of useful geothermal energy deposits. (DJE 2005)

Duffield, Wendell A.; Sass, John H.; Sorey, Michael L.

1994-01-01T23:59:59.000Z

492

Wireless power transmission using ultrasonic guided waves  

Science Journals Connector (OSTI)

The unavailability of suitable power supply at desired locations is currently an important obstacle in the development of distributed, wireless sensor networks for applications such as structural health monitoring of aircraft. Proposed solutions range from improved batteries to energy harvesting from vibration, temperature gradients and other sources. A novel approach is being investigated at Cardiff University School of Engineering in cooperation with Airbus. It aims to utilise ultrasonic guided Lamb waves to transmit energy through the aircraft skin. A vibration generator is to be placed in a location where electricity supply is readily available. Ultrasonic waves generated by this device will travel through the aircraft structure to a receiver in a remote wireless sensor node. The receiver will convert the mechanical vibration of the ultrasonic waves back to electricity, which will be used to power the sensor node. This paper describes the measurement and modelling of the interference pattern which emerges when Lamb waves are transmitted continuously as in this power transmission application. The discovered features of the pattern, such as a large signal amplitude variation and a relatively high frequency, are presented and their importance for the development of a power transmission system is discussed.

A Kural; R Pullin; C Featherston; C Paget; K Holford

2011-01-01T23:59:59.000Z

493

AN ARTIFICIAL NEURAL NETWORK BASED TRANSMISSION LOSS ALLOCATION FOR BILATERAL CONTRACTS  

E-Print Network (OSTI)

AN ARTIFICIAL NEURAL NETWORK BASED TRANSMISSION LOSS ALLOCATION FOR BILATERAL CONTRACTS Rezaul to allocate transmission loss to respective transactions. An artificial neural network based transmission loss technique. Keywords: Neural network; transmission loss; loss allocation; bilateral contracts. 1

Saskatchewan, University of

494

Evaluation of power system security and development of transmission pricing method  

E-Print Network (OSTI)

benefits in transmission services. The proposed method shows the transmission transaction cost of reliability benefits when transmission line capacities are considered. The ratio between allocation by transmission line capacity-use and allocation...

Kim, Hyungchul

2004-11-15T23:59:59.000Z

495

Curtailing transmission of severe acute respiratory syndrome within a community and its hospital  

Science Journals Connector (OSTI)

...alternative modes of transmission have been postulated...stochastic effects, but SARS transmission is assumed to be a homogeneous...in that the base- line transmission rate is represented...shown, broken down by route of transmission within...

2003-01-01T23:59:59.000Z

496

Modelling locational price spreads in competitive electricity markets; applications for transmission rights valuation and replication  

Science Journals Connector (OSTI)

......historical data to calibrate...training data can make...capacity of the transmission line, in megawatts...transmission outages or expansion...training data can make...capacity of the transmission line, in megawatts...transmission outages or expansion......

Petter Skantze; Marija Ilic; Andrej Gubina

2004-10-01T23:59:59.000Z

497

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

SciTech Connect

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

498

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

499

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from John Brodeer  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

500

Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin  

Energy.gov (U.S. Department of Energy (DOE))

Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.