RTO Briefing  

DOE Green Energy (OSTI)

OAK-B135 Transmission Updates The summary of this report is: (1) Small generators are not happy with FERC's Small Generator Interconnection NOPR, saying the proposed rule ignores much of the consensus developed between small generators and transmission owners during the ANOPR process. California wind generators seek clarification that repowering an existing facility or changing contract terms would not trigger a reevaluation of the interconnection. (2) The choices of former Alliance companies about which RTO to join, MISO or PJM, and whether they can obtain approval from states to do so, has created such a tangle that FERC held two days of hearings at the end of September on the issues and options for resolving them. But in addition to some constructive input, the hearings produced even more uncertainty, with transmission companies announcing their need to reassess their own RTO commitments depending on the decisions of others. (3) In the West, the Seams Steering Group--Western Interconnection (SSG-WI) completed a west-wide transmission study with a renewable energy scenario, the California ISO received FERC's approval on its market redesign proposal, and RTO West worked toward finalizing high-level consensus documents describing Day 1 implementation of the proposed RTO. (4) In Texas, ERCOT began $157 million in upgrades to the transmission system around McCamey--increasing capacity in and out of the area enough to handle existing wind projects there.

Steve Wiese

2003-11-01T23:59:59.000Z

2

Comments in response to FERC rulemaking on regional transmission organizations  

E-Print Network (OSTI)

On May 13, 1999, the Federal Energy Regulatory Commission (FERC) issued a Notice of Proposed Rulemaking (NOPR) on Regional Transmission Organizations (RTO). The purpose of the NOPR is to solicit comments on proposed FERC ...

Joskow, Paul L.

1999-01-01T23:59:59.000Z

3

A Review of Recent RTO Benefit-Cost Studies: Toward MoreComprehensive Assessments of FERC Electricity RestructuringPolicies  

Science Conference Proceedings (OSTI)

During the past three years, government and private organizations have issued more than a dozen studies of the benefits and costs of Regional Transmission Organizations (RTOs). Most of these studies have focused on benefits that can be readily estimated using traditional production-cost simulation techniques, which compare the cost of centralized dispatch under an RTO to dispatch in the absence of an RTO, and on costs associated with RTO start-up and operation. Taken as a whole, it is difficult to draw definitive conclusions from these studies because they have not examined potentially much larger benefits (and costs) resulting from the impacts of RTOs on reliability management, generation and transmission investment and operation, and wholesale electricity market operation. This report: (1) Describes the history of benefit-cost analysis of FERC electricity restructuring policies; (2)Reviews current practice by analyzing 11 RTO benefit-cost studies that were published between 2002 and 2004 and makes recommendations to improve the documentation of data and methods and the presentation of findings in future studies that focus primarily on estimating short-run economic impacts; and (3) Reviews important impacts of FERC policies that have been overlooked or incompletely treated by recent RTO benefit-cost studies and the challenges to crafting more comprehensive assessments of these impacts based on actual performance, including impacts on reliability management, generation and transmission investment and operation, and wholesale electricity market operation.

Eto, Joseph H.; Lesieutre, Bernard C.

2005-12-01T23:59:59.000Z

4

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

5

Implications of Regional Transmission Organization Design for Renewable Energy Technologies  

DOE Green Energy (OSTI)

This report summarizes the development of Regional Transmission Organizations (RTOs) and assesses the potential implications of market rules for renewable energy technologies. The report focuses on scheduling provisions, as these have proved problematic in some cases for intermittent renewable energy technologies. Market rules of four RTOs-the Pennsylvania-Maryland-New Jersey ISO, the ERCOT ISO, the Midwest ISO and the New York ISO (NYISO)-were examined to determine the impact on intermittent renewable energy projects such as wind energy generators. Also, a more general look was taken at how biomass power may fare in RTOs, specifically whether these technologies can participate in ancillary service markets. Lastly, an assessment was made regarding the implications for renewable energy technologies of a Northeast-wide RTO that would combine the three existing Northeast ISOs (the aforementioned PJM and NYISOs, as well as ISO New England).

Porter, K.

2002-05-01T23:59:59.000Z

6

Regional Transmission Organizations and Wind Energy: A Happy Marriage or Divorce Proceedings?; Preprint  

SciTech Connect

In 1996, the Federal Energy Regulatory Commission (FERC) issued Order 888, which required transmission-owning utilities under FERC jurisdiction to provide open access transmission service to eligible wholesale power customers. Among other things, the elements of electric service are unbundled, meaning that wind project developers must not only find a taker for the energy but also potentially make interconnection, ancillary service, and transmission arrangements for their wind projects. In 1999, the FERC issued Order 2000, which required transmission-owning utilities to file an intent with FERC on whether they have joined or plan to join a regional transmission organization (RTO). Order 2000 also required RTOs to meet certain criteria and be approved by FERC in order to begin operations as an RTO. More recently, FERC said it would issue a Notice of Proposed Rulemaking in 2002 on certain requirements and services, often termed''standard market design'' (SMD), that must be included in all transmission tariffs filed at FERC. This paper discusses the chronology of open access transmission issues, from Order 888 onward, and reviews some of the important issues raised by FERC's SMD initiative.

Parsons, B.; Porter, K.

2002-05-01T23:59:59.000Z

7

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

8

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

9

Midwest Independent Transmission System Operator (MISO) Energy Storage Study  

Science Conference Proceedings (OSTI)

Midwest Independent Transmission System Operator (MISO) is a nonprofit member-based organization regulated by the Federal Energy Regulatory Commission (FERC). As a Regional Transmission Organization (RTO), MISO provides electricity consumers in 13 states with regional grid management and open access to transmission facilities at a tariff closely regulated by FERC. MISO follows a cycle known as the MISO Transmission Expansion Plan (MTEP) that results in annual recommendations to proceed with expansion pro...

2012-02-29T23:59:59.000Z

10

The Electric Transmission Network: A Multi-Region Analysis  

U.S. Energy Information Administration (EIA)

Modeling and Analysis Papers>The Electric Transmission Network: A Multi-Region Analysis : The Electric Transmission Network: A Multi-Region Analysis

11

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

12

Public policy and private interests: why transmission planning and cost-allocation methods continue to stifle renewable energy policy goals  

SciTech Connect

It has been almost 10 years since FERC Order 2000 created regional transmission organizations and independent system operators in order to establish competitive power markets and to stimulate the development of new transmission. Now, the dominant behavior of the incumbent transmission owners, expressed through their RTO and ISO transmission expansion planning processes, is at loggerheads with public policies aimed at developing renewable energy resources. (author)

Puga, J. Nicolas; Lesser, Jonathan A.

2009-12-15T23:59:59.000Z

13

RTO and Balancing AuthoritProposals for EIA Surveys  

U.S. Energy Information Administration (EIA)

... Integration of renewable generation Implementation of demand response Integration of new ... RTO and Balancing AuthoritProposals for EIA Surveys Author: USCX ...

14

Property:EIA/861/RtoSpp | Open Energy Information  

Open Energy Info (EERE)

RtoSpp RtoSpp Jump to: navigation, search Property Name RTO_SPP Property Type Boolean Description Indicates that the organization conducts operations in the SPP RTO. [1] References ↑ "EIA Form EIA-861 Final Data File for 2010 - 861 Webfile Layout for 2010.doc" Pages using the property "EIA/861/RtoSpp" Showing 25 pages using this property. (previous 25) (next 25) A Alfalfa Electric Coop, Inc + true + B Basin Electric Power Coop + true + C C & L Electric Coop Corp + true + Central Nebraska Pub P&I Dist + true + City Utilities of Springfield + true + City Water and Light Plant + true + City of Alexandria, Louisiana (Utility Company) + true + City of Altus, Oklahoma (Utility Company) + true + City of Arma, Kansas (Utility Company) + true +

15

Property:EIA/861/RtoPjm | Open Energy Information  

Open Energy Info (EERE)

RtoPjm RtoPjm Jump to: navigation, search Property Name RTO_PJM Property Type Boolean Description Indicates that the organization conducts operations in the PJM RTO [1] References ↑ "EIA Form EIA-861 Final Data File for 2010 - 861 Webfile Layout for 2010.doc" Pages using the property "EIA/861/RtoPjm" Showing 25 pages using this property. (previous 25) (next 25) A A & N Electric Coop (Virginia) + true + Adams Electric Cooperative Inc + true + Adams Rural Electric Coop, Inc + true + Allegheny Electric Coop Inc + true + Allegheny Energy Supply Co LLC + true + American Mun Power-Ohio, Inc + true + Appalachian Power Co + true + Atlantic City Electric Co + true + B Bedford Rural Elec Coop, Inc + true + Borough of Butler, New Jersey (Utility Company) + true +

16

Electric Transmission Network: A Multi-Region Analysis, The  

Reports and Publications (EIA)

This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

Robert T. Eynon

2000-08-01T23:59:59.000Z

17

THE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS  

E-Print Network (OSTI)

for the establishment of open access transmission in the US, while the Electricity Directive 96/92 of the European Union robust competition in wholesale electricity markets and mandate transmission-owning utilities to provideTHE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS ProfessorGeorge Gross

Gross, George

18

Coordinated dispatch of regional transmission organizations: Theory and example  

Science Conference Proceedings (OSTI)

In this paper we consider the coordination of economic dispatch across multiple Regional Transmission Organizations (RTOs) to optimize interchange levels, including consideration of the coordination of ''congestion relief'' as practiced in the Eastern ... Keywords: Congestion relief, Economic dispatch, Hierarchical optimization, Interchange optimization, Regional transmission organizations

Ross Baldick, Dhiman Chatterjee

2014-01-01T23:59:59.000Z

19

Policy on regional transmission organizations: Five pitfalls FERC must avoid  

SciTech Connect

In announcing in late November that it would explore what role it might play in developing regional transmission organizations, the Federal Energy Regulatory Commission (FERC) took the first step in a process that will be crucial to capturing maximum regional efficiency from the transmission grid. Ahead, though, lie many obstacles, a FERC commissioner warns.

Massey, W.L. [Federal Energy Regulatory Commission, Washington, DC (United States)

1999-03-01T23:59:59.000Z

20

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

22

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

DOE Green Energy (OSTI)

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

23

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Planning.pdf NWCC. 2007a. FERC Order 890: What Does It Meanof wholesale power competition. FERC Order 2000 providesISO/RTO are being pushed by FERC to expand the transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

24

U.S. Department of Energy 2012 National Electric Transmission Congestion Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 National Electric 12 National Electric Transmission Congestion Study Eastern Regional Workshop St. Louis, MO Rep. Tom Sloan, Kansas Congestion Means: Convergence of Political and Technological Limitations on Operation of Grid Price signal to incent investment in local generation or/and regional transmission or/and increased energy conservation investments An impediment to moving large amounts of lower-cost renewable energy to distant load centers An opportunity for the DOE to Partner with stakeholders on innovative programs to address the political impediments to alleviating congestion Commend DOE Efforts to Address Political Congestion: Reaching out to Lauren Azar and an RTO Engineer Carefully Considering DOE Electricity Advisory Committee Recommendations

25

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

DOE Green Energy (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

26

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

DOE Green Energy (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

27

Moving beyond paralysis: how states and regions are creating innovative transmission policies for renewable energy projects  

SciTech Connect

Experience from state and regional transmission siting initiatives aimed at expanding renewable energy development might offer lessons on how to circumvent traditional barriers to new transmission. Absent a national approach or federal transmission plan, these early models will provide a framework for increasing interstate cooperation. (author)

Schumacher, Allison; Fink, Sari; Porter, Kevin

2009-08-15T23:59:59.000Z

28

Remarks for DOE Workshop Regarding Transmission Congestion Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 Remarks for DOE Workshop Regarding Transmission Congestion Study Thank you for the opportunity to speak today. I am Ed Finley and I chair the North Carolina Utilities Commission. By way of background, with the exception of a very small portion of the State - the northeast - North Carolina does not participate in a regional transmission organization, or RTO, and our electric utilities remain vertically integrated. North Carolina's electric utilities are required to plan their systems on a least-cost, integrated basis, considering generation and transmission costs, as well as energy efficiency and demand-side management. There is no retail competition in North Carolina. Regulation in North Carolina follows the "command and control" model. The NC Commission must

29

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

30

Spectra of Reciprocal Transmission: Generalization to Saturated Regions  

Science Conference Proceedings (OSTI)

The results of Munk et al. (1981), relating spectra of ocean sound-speed and water-particle velocity to observable acoustic spectra are applicable only in the geometrical optics region. It is shown that analogous formulas that are valid in the ...

Stanley M. Flatt

1981-04-01T23:59:59.000Z

31

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

Science Conference Proceedings (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

32

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

33

Long-Term Rights for New Resources: A Crucial Missing Ingredient in RTO Markets  

Science Conference Proceedings (OSTI)

Unless generation that can produce low-cost energy is brought back into the mix, regional transmission organizations will become just a very expensive means to deliver high-cost energy and to allocate increasingly scarce, natural monopoly transmission resources to those prepared to pay the most. For baseload as well as renewable generation that cannot be located close to load, long-term transmission rights ensure delivery of their output at a predictable price.

Bogorad, Cynthia; Huang, William

2005-09-01T23:59:59.000Z

34

Flexible gas insulated transmission line having regions of reduced electric field  

DOE Patents (OSTI)

A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

Cookson, Alan H. (Pittsburgh, PA); Fischer, William H. (Wilkins Township, Allegheny County, PA); Yoon, Kue H. (Pittsburgh, PA); Meyer, Jeffry R. (Penn Hills Township, Allegheny County, PA)

1983-01-01T23:59:59.000Z

35

Elimination of higher-order diffraction using zigzag transmission grating in soft x-ray region  

Science Conference Proceedings (OSTI)

We present a realization of the sinusoidal transmission function using a series of zigzag-profiled strips where the transmission takes on the binary values 0 and 1 in a two-dimensional distribution. A zigzag transmission grating of 1000 line/mm has been fabricated and demonstrated on the soft x-ray beam of synchrotron radiation. The axial single-order diffraction indicates that the zigzag transmission grating is adequate for spectroscopic application.

Zang, H. P.; Wang, C. K. [Research Center of Laser Fusion, China Academy of Engineering Physics, Mianyang, Sichuan 621900 (China); Institute of Atomic and Molecular Physics, Sichuan University, Chengdu 610065 (China); Gao, Y. L.; Zhou, W. M.; Kuang, L. Y.; Wei, L.; Fan, W.; Zhang, W. H.; Zhao, Z. Q.; Cao, L. F.; Gu, Y. Q.; Zhang, B. H. [Research Center of Laser Fusion, China Academy of Engineering Physics, Mianyang, Sichuan 621900 (China); Jiang, G. [Institute of Atomic and Molecular Physics, Sichuan University, Chengdu 610065 (China); Zhu, X. L.; Xie, C. Q. [Institute of Microelectronics, Chinese Academy of Sciences, Beijing 100029 (China); Zhao, Y. D.; Cui, M. Q. [Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049 (China)

2012-03-12T23:59:59.000Z

36

Open-Source Software for Power Industry Research, Teaching, and Training  

E-Print Network (OSTI)

for power Transmission grid congestion managed via some variant of Locational Marginal Pricing (LMP) Prices version of the WPMP market design. #12;5 Regions Adopting Versions of WPMP Design to Date http://www.ferc.gov/industries/electric/indus-act/rto/rto-map by an Independent System Operator (ISO) or a Regional Transmission Organization (RTO) Day-ahead & real-time markets

Tesfatsion, Leigh

37

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

Science Conference Proceedings (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitaton is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1988-01-01T23:59:59.000Z

38

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

Science Conference Proceedings (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitation is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1989-01-01T23:59:59.000Z

39

OPTIMIZING TRANSMISSION SERVICE COST OF KHUZESTAN REGIONAL GRID BASED ON NSGA?II ALGORITHM  

Science Conference Proceedings (OSTI)

Any plan for modeling the components of transmission service costs should be able to consider congestion as well as loss cost. Assessing the real value of congestion and loss costs in each network has a substantial contribution to analyze the grids weaknesses in order to release capacity of power network. As much as the amount of congestion and loss costs in the transmission grid reduces the amount of power passing through transmission lines increases. Therefore

Alireza Tavakoli Shooshtari; Mahmood Joorabian; Armin Ebrahimi Milani; Arash Gholamzadeh

2011-01-01T23:59:59.000Z

40

GTT 2012 Transmission Workshop - Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop - Documents Transmission Workshop - Documents GTT 2012 Transmission Workshop - Documents Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012 Agenda Roster of Attendees Presentation - Overview - Anjan Bose, DOE Presentation - EERE Issues and Opportunities - David Danielson, DOE Presentation - Vision for the Future - Lauren Azar, DOE Presentation - Tomorrow's Power System - Michael Heyeck, EPRI Presentation - FERC Overview - Cheryl LaFleur, FERC Presentation - ISO/RTO Challenges and Opportunities - Carl Monroe, Southwest Power Pool Product - Future Vision & Grid Challenges: Summary Results of Breakout Group Discussions Product - Opportunities to Overcome Key Challenges: Summary Results of Breakout Group Discussions Product - Final Discussion Summary Report

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Transmission Expansion in Argentina 5: The Regional Electricity Forum of Buenos Aires Province  

E-Print Network (OSTI)

that adhered to the federal scheme 3 used for expansions and developments at 132 kV or lower, including low voltage grids, isolated generation in small towns, rural electrification and small hydroelectric power plants. Some 3893 km of 132 kV transmission...

Littlechild, Stephen C; Ponzano, Eduardo A

42

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 1, FEBRUARY 2005 171 Dispatchable Transmission in RTO Markets  

E-Print Network (OSTI)

the view of the Federal Energy Regulatory Commission. Paper no. TPWRS- 00566-2003 R. P. O'Neill and U. Helman are with the Federal Energy Regulatory Com- mission, Office of Markets, Tariffs and Rates, The University of Texas, Austin, TX 78712 USA (e-mail: baldick@ece.utexas.edu). M. H. Rothkopf

Baldick, Ross

43

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive...  

NLE Websites -- All DOE Office Websites (Extended Search)

management, generation and transmission investment and operation, and wholesale electricity market operation. This report: 1) Describes the history of benefit-cost...

44

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive...  

NLE Websites -- All DOE Office Websites (Extended Search)

management, generation and transmission investment and operation, and wholesale electricity market operation. This report: Describes the history of benefit-cost analysis...

45

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies  

E-Print Network (OSTI)

efficiency and availability, and transmission capability).O&C costs) and availability. Transmission capability,O&C costs) and availability. Transmission capability,

Eto, Joseph H.; Lesieutre, Bernard C.

2005-01-01T23:59:59.000Z

46

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

47

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

48

A Regional Approach to Market Monitoring in the West  

Science Conference Proceedings (OSTI)

Market monitoring involves the systematic analysis of pricesand behavior in wholesale power markets to determine when and whetherpotentially anti-competitive behavior is occurring. Regional TransmissionOrganizations (RTOs) typically have a market monitoring function. Becausethe West does not have active RTOs outside of California, it does nothave the market monitoring that RTOs have. In addition, because the Westoutside of California does not have RTOs that perform centralized unitcommitment and dispatch, the rich data that are typically available tomarket monitors in RTO markets are not available in the West outside ofCalifornia. This paper examines the feasibility of market monitoring inthe West outside of California given readily available data. We developsimple econometric models of wholesale power prices in the West thatmight be used for market monitoring. In addition, we examine whetherproduction cost simulations that have been developed for long-runplanning might be useful for market monitoring. We find that simpleeconometric models go a long ways towards explaining wholesale powerprices in the West and might be used to identify potentially anomalousprices. In contrast, we find that the simulated prices from a specificset of production cost simulations exhibit characteristics that aresufficiently different from observed prices that we question theirusefulness for explaining price formation in the West and hence theirusefulness as a market monitoring tool.

Barmack, Matthew; Kahn, Edward; Tierney, Susan; Goldman, Charles

2006-10-01T23:59:59.000Z

49

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

50

Toward More Comprehensive Assessments of FERC ElectricityRestructuring Policies: A Review of Recent Benefit-Cost Studies ofRTO's  

Science Conference Proceedings (OSTI)

Definitive assessment of Federal Energy Regulatory Commission policies on regional transmission organizations is not currently possible because of uncertainties in the data and methods used in recent benefit-cost studies as well as lack of investigation of key impacts of the formation of RTOs.

Eto, Joseph H.; Hale, Douglas R.; Lesieutre, Bernard C.

2006-11-01T23:59:59.000Z

51

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies  

E-Print Network (OSTI)

Administration. 2004. Electricity Transmission in aInterruptions to U.S. Electricity Customers. September. (Cost Models in Electricity Planning and Pricing.

Eto, Joseph H.; Lesieutre, Bernard C.

2005-01-01T23:59:59.000Z

52

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

53

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies  

E-Print Network (OSTI)

and regional energy-market clearing prices. Sponsored by PJMsupply energy at a price higher than the market price (and

Eto, Joseph H.; Lesieutre, Bernard C.

2005-01-01T23:59:59.000Z

54

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

55

A Review of Recent RTO Benefit-Cost Studies: Toward More Comprehensive Assessments of FERC Electricity Restructuring Policies  

E-Print Network (OSTI)

Regulatory Commission (FERC). 1996. Environmental Impactland-docs/rm95-8p3-000.txt FERC. 1999. Regional Transmissionfileid=9514094&trial=1 FERC. 2004. Staff Report on Cost

Eto, Joseph H.; Lesieutre, Bernard C.

2005-01-01T23:59:59.000Z

56

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

57

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

58

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

59

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

60

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network (OSTI)

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

62

Relationships of Light Transmission, Stratification and Fluorescence in the Hypoxic Region of the Texas-Louisiana Shelf in Spring/Summer 2009  

E-Print Network (OSTI)

The growth of phytoplankton in hypoxic waters requires nutrients and light. In river plumes of the coastal ocean, river borne surface nutrient concentrations decrease with distance from the river mouth. Light availability at the surface also changes with distance from the river source, as particulates and other materials sink through the water column. Using in situ CTD sensors, water samples of nutrients, and ship flow-through data from two Louisiana Shelf research cruises, April and July 2009, the relationship between transmissivity, photosynthetically available radiation (PAR), stratification, and fluorescence are analyzed. PAR is measured using a silicon photovoltaic detector and is measured in the 400 to 700 nm range. A fluorometer is used to measure the fluorescence of chlorophyll a in g/L and is a proxy indicator for phytoplankton biomass. The Louisiana Shelf is home to the largest hypoxic zone in the western hemisphere, covering on average more than 15000 sq. km. The Louisiana hypoxic zone occurs seasonally in summer and is typically dissipated by physical processes in fall. Hypoxia is defined as waters that have a dissolved oxygen concentration of 1.4 ml/L and is the level at which marine organisms are typically adversely affected. Preliminary results show expected relationships between transmissivity and fluorescence in the water column indicating a positive correlation between light availability and fluorescence. The spatial distribution of stratification, light availability, fluorescence, and nutrients are compared for the different seasons.

Towns, Jenny L

2010-05-01T23:59:59.000Z

63

2009 National Electric Transmission Congestion Study - Hartford...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive...

64

2012 National Electric Transmission Congestion Study - Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA...

65

2009 National Electric Transmission Congestion Study - Oklahoma...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

66

ESSAYS IN FINANCIAL TRANSMISSION RIGHTS PRICING.  

E-Print Network (OSTI)

??This work examines issues in the pricing of financial transmission rights in the PJM market region. The US federal government is advocating the creation of (more)

Posner, Barry

2006-01-01T23:59:59.000Z

67

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Aug 3, 2009 ... Abstract: Expanding an electrical transmission network requires heavy investments that need to be carefully planned, often at a regional or...

68

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

69

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

70

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

71

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

72

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

73

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

74

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

75

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

76

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

77

Boundary stabilization of transmission problems  

E-Print Network (OSTI)

We study the transmission problem in bounded domains with dissipative boundary conditions. Under some natural assumptions, we prove uniform bounds of the corresponding resolvents on the real axis at high frequency, and as a consequence, we obtain free of eigenvalues regions. As an application, we get exponential decay of the energy of the solutions of the correpsonding mixed boundary value problems.

Fernando Cardoso; Georgi Vodev

2009-10-20T23:59:59.000Z

78

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

79

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

80

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Design of resource to backbone transmission for a high wind penetration future.  

E-Print Network (OSTI)

??In a high wind penetration future, transmission must be designed to integrate groups of new wind farms with a high capacity inter-regional ``backbone" transmission system. (more)

Slegers, James Michael

2013-01-01T23:59:59.000Z

82

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed  

E-Print Network (OSTI)

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed Synapses on Mauthner Cells regions, suggesting that connexin35-mediated electrical transmission is common in goldfish brain" (electrical and chemical) synaptic terminals that offer the unique opportunity to correlate physiological

Rash, John E.

83

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

84

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism, American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

85

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

86

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

87

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; its a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

88

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

89

Modeling Interregional Transmission Congestion in the National Energy Modeling System  

E-Print Network (OSTI)

22 3.4 No Coal25 3.4.1 Coal Supply Regions and Electricity Market24 Figure 3-14 Economic Transmission in No Coal

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-01-01T23:59:59.000Z

90

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

91

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

92

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

93

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

94

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

95

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

96

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

97

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

conventional power and wind power make transmission more300 MW or more of new wind power and focus on the deeperthe trend toward wind powers inclusion in regional

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

98

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

99

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

100

Helping our members work together to keep the lights on today and in the future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISO/RTO ISO/RTO Challenges and Opportunites DOE Transmission Workshop Crystal City, VA November 1, 2012 Carl Monroe, EVP & COO cmonroe@spp.org · 501.614.3218 Independent System Operator (ISO) / Regional Transmission Organization (RTO) Map 3 California ISO Southwest Power Pool Alberta Electric System Operator MISO Electric Reliability Council of Texas PJM Interconnection New York ISO ISO New England Ontario Independent Electricity System Operator New Brunswick System Operator Improving Visibility and Understanding 4 This August 2011 storm caused more than a dozen concurrent transmission and generation outages Improving Visibility and Understanding 5 SPP kept the lights on, but at what cost? How can we use technology and data to implement better

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Adaptive control of hydraulic shift actuation in an automatic transmission  

E-Print Network (OSTI)

A low-order dynamic model of a clutch for hydraulic control in an automatic transmission is developed by separating dynamics of the shift into four regions based on clutch piston position. The first three regions of the ...

Thornton, Sarah Marie

2013-01-01T23:59:59.000Z

102

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); analyze the potential within the district to utilize farm wastes to produce biofuels; enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; identify the policy, regulatory, and financial barriers impeding development of a new energy system; and improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the Colleges yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

103

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

104

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

105

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

106

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

107

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

108

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

109

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

110

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

111

2009 National Electric Transmission Congestion Study - Las Vegas Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Las Vegas 2009 National Electric Transmission Congestion Study - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop

112

RFI Comments - ISO/RTO Council  

Science Conference Proceedings (OSTI)

... RTOs have developed additional instrumentation tools to measure ... disrupted (typically related to weather incidents), the ... as a security tool as well. ...

2013-04-10T23:59:59.000Z

113

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

114

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

115

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

116

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

117

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

118

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

119

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

120

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

122

Assumptions to the Annual Energy Outlook - Natural Gas Transmission and  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module Assumption to the Annual Energy Outlook Natural Gas Transmission and Distribution Module Figure 8. Natural Gas Transmission and Distribution Model Regions. Having problems, call our National Energy Information Center at 202-586-8800 for help. The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution

123

Renewable Energy Transmission Initiative Phase 1A  

E-Print Network (OSTI)

94597 Tel: (913) 458-2000 www.bv.com #12;Principal Investigators: Ryan Pletka, Project Manager Andy Potential in RETI Study region. ......... 6-23 Table 6-11. Candidate LFG Projects (3 MW and Greater information to be used in Phase 1B of the California Renewable Energy Transmission Initiative project. 1

124

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

125

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

126

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

127

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

128

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

129

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

130

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

131

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERCs July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

132

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

133

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

134

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

135

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

136

Broadband Water Vapor Transmission Functions for Atmospheric IR Flux Computations  

Science Conference Proceedings (OSTI)

Transmission functions associated with water vapor molecular line and e-type absorption in the IR spectral regions are presented in the form of simple analytical functions and small tables, from which atmospheric IR fluxes and cooling rates can ...

Ming-Dah Chou

1984-05-01T23:59:59.000Z

137

2012 National Electric Transmission Congestion Study - San Diego...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to...

138

2012 National Electric Transmission Congestion Study- San Diego Workshop  

Energy.gov (U.S. Department of Energy (DOE))

On December 15, 2011, DOE hosted a regional pre-study workshopin San Diego, CA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop...

139

USLCI Interconnect Region Electricity datasets, 2008 Datasets...  

Open Energy Info (EERE)

spreadsheet are also included.

Datasets include generation and transmission of electricity for each of the interconnect regions. It is representative of the year...

140

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Western Area Power Administration, Desert Southwest Region Liberty-Parker 2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A multilayer grating with a novel layer structure for a flat-field spectrograph attached to transmission electron microscopes in energy region of 2-4 keV  

SciTech Connect

A multilayer mirror with a novel layer structure to uniformly enhance the reflectivity in a few keV energy range at a fixed angle of incidence is invented and applied to a multilayer grating for use in a flat-field spectrograph attached to a conventional electron microscope. The diffraction efficiency of the fabricated multilayer grating having the new layer structure is evaluated at the angle of incidence of 88.65 deg. in the energy region of 2.1-4.0 keV. It is shown that the multilayer grating is effective to uniformly enhance the diffraction efficiency and able to be practically used in this energy region.

Imazono, T.; Koike, M.; Koeda, M.; Nagano, T.; Sasai, H.; Oue, Y.; Yonezawa, Z.; Kuramoto, S.; Terauchi, M.; Takahashi, H.; Handa, N.; Murano, T. [QuBS, Japan Atomic Energy Agency (JAEA), 8-1-7 Umemidai, Kizugawa, Kyoto 619-0215 (Japan); Device Dept., Shimadzu Corp., 1 Nishinokyo-Kuwabarcho, Nakagyo-ku, Kyoto 604-8511 (Japan); IMRAM, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai 980-8577 (Japan); EC Business Unit, JEOL Ltd., 3-1-2 Musashino, Akishima, Tokyo 196-8558 (Japan)

2012-05-17T23:59:59.000Z

142

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

143

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

144

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

145

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

146

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

147

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

148

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

149

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

150

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

151

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

152

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

153

Transmission Planning for Wind Energy: Status and Prospects  

Science Conference Proceedings (OSTI)

This paper provides an overview of major transmission planning activities related to wind integration studies in the US and Europe. Transmission planning for energy resources is different from planning for capacity resources. Those differences are explained, and illustrated with examples from several regions of the US and Europe. Transmission planning for wind is becoming an iterative process consisting of generation expansion planning, economic-based transmission planning, system reliability analysis, and wind integration studies. A brief look at the policy environment in which this activity is taking place is provided.

Smith, J. C.; Osborn, D.; Piwko, R.; Zavadil, R.; Parsons, B.; Hawkins, D.; Lasher, W.; Nickell, B.

2009-01-01T23:59:59.000Z

154

Economics of Transmission Planning: Methods, Examples, and Tools  

Science Conference Proceedings (OSTI)

This report describes an economic planning methodology that can be applied to regional and interregional transmission planning. It is modeled after long-distilled practices at the Midwest Independent System Operator (MISO) and a newer, proposed analysis for identifying the potential interregional developments of greatest mutual benefit to the energy trading regions. Existing and new examples of transmission planning exercises conducted by MISO facilitate the description. MISO background studies introduce...

2011-12-30T23:59:59.000Z

155

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

156

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

157

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

158

2012 National Electric Transmission Congestion Study - Philadelphia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

159

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

160

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

162

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

163

2012 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Planning » Transmission Planning » Congestion Studies » 2012 National Electric Transmission Congestion Study Workshops 2012 National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. For details, please select a workshop, below. Agendas, presentations, and transcripts are available on the individual workshop pages; please select a workshop from the list below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops would be simulcast over the Internet and that advanced registration for the Webcasts was required. The workshops were not simulcast. The Department requested, but did not require, those who

164

2009 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Technology Development » Transmission Planning » Services » Technology Development » Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a panel of invited speakers to present their views and comments. For details, including agendas, transcripts, and documents submitted for consideration for the 2009 study, please select a workshop, below. June 11, 2008 San Francisco, CA June 18, 2008 Oklahoma City, OK

165

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

166

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

167

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

168

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

169

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

170

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

171

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

172

Great Plains Wind Energy Transmission Development Project  

DOE Green Energy (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

173

WECC releases its first-ever transmission plan for the Western Interconnection  

Energy.gov (U.S. Department of Energy (DOE))

The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

174

WECC releases its first-ever transmission plan for the Western...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection. The Plan was developed through WECC's Regional Transmission Expansion Planning (RTEP) project, as part of a grant from the U.S. Department of Energy...

175

A mechanistic approach for accurate simulation of village scale malaria transmission  

E-Print Network (OSTI)

Background: Malaria transmission models commonly incorporate spatial environmental and climate variability for making regional predictions of disease risk. However, a mismatch of these models' typical spatial resolutions ...

Duchemin, Jean-Bernard

176

Competitive Privacy in the Smart Grid: An Information-theoretic Approach  

E-Print Network (OSTI)

Advances in sensing and communication capabilities as well as power industry deregulation are driving the need for distributed state estimation in the smart grid at the level of the regional transmission organizations (RTOs). This leads to a new competitive privacy problem amongst the RTOs since there is a tension between sharing data to ensure network reliability (utility/benefit to all RTOs) and withholding data for profitability and privacy reasons. The resulting tradeoff between utility, quantified via fidelity of its state estimate at each RTO, and privacy, quantified via the leakage of the state of one RTO at other RTOs, is captured precisely using a lossy source coding problem formulation for a two RTO network. For a two-RTO model, it is shown that the set of all feasible utility-privacy pairs can be achieved via a single round of communication when each RTO communicates taking into account the correlation between the measured data at both RTOs. The lossy source coding problem and solution developed he...

Sankar, Lalitha; Tandon, Ravi; Poor, H Vincent

2011-01-01T23:59:59.000Z

177

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

178

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

179

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-07-03T23:59:59.000Z

180

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

182

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

183

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

184

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

185

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

186

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

187

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability analysisoftransmissionanddistributionVoltageRecovery,NERCTransmissionIssues SubcommitteAirConditionerResponsetoTransmissionFaults. ,IEEE

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

188

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights, IEEEto solve power transmission network design problems, IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

189

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

190

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

191

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

192

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

193

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

194

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

195

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

196

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

197

DOE Seeking Information on Transmission Line Permitting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

198

2009 National Electric Transmission Congestion Study - Hartford Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Hartford 2009 National Electric Transmission Congestion Study - Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 7-09-08 Congestion Workshop Agenda - Hartford, CT.pdf Transcript - 2009 National Electric Transmission Congestion Study Hartford Workshop.pdf Comments of the New York Independent System Operator, submitted at 2009 Congestion Study Hartford workshop_0.pdf Prepared Remarks of Brian Forshaw, Connecticut Municipal Electric Energy Cooperative, submitted at 2009 Congestion Study Hartford workshop_0.pdf

199

National Electric Transmission Congestion Study 2012 Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Congestion Study 2012 Workshops Transmission Congestion Study 2012 Workshops National Electric Transmission Congestion Study 2012 Workshops DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study 2012. For details, please see the pdfs, below. Online registration for these workshops is now available. Agendas are available below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops will be simulcast over the Internet and that advanced registration for the Webcasts is required. The workshops will not be simulcast. The Department requests, but does not require, those who are planning to attend the workshops in person to pre-register using the link

200

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Full Text of the National Electric Transmission Congestion Study 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY AUGUST 2006 U.S. Department of Energy Contents Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii Acronyms Used in This Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1. Organization of This Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.2. Definitions of Key Terms and Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.3. Consultation with States and Regional Entities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 2. Study Approach and Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

202

Electricity transmission: an overview of the current debate  

E-Print Network (OSTI)

, FERC, pursued the implementation of a Standard Market Design and encouraging larger Regional Transmission Organisations to facilitate efficient trade over wider areas and transmission investment. In Europe, under prompting from the European... will soon be) implemented in some variation in several states in the US (e.g. PJM, New York, New England, Texas and California) and is a cornerstone of FERCs proposed Standard Market Design. For short-run congestion management there is agreement that a...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

203

Narrow-band optical transmission of metallic nanoslit arrays  

Science Conference Proceedings (OSTI)

Metallic nanoslit arrays usually demonstrate wide transmission bands for transverse-magnetic-polarized incidence light. Here, we show that by introducing multi-dielectric layers underneath the metallic structure layer on the substrate, a narrow peak is formed, whose bandwidth can be down to a few nanometers. Three types of resonance modes in the region under the metal layer are identified responsible for the formation of the peak, i.e., a two-dimensional cavity resonance mode, which supports optical transmission, and two in-plane hybrid surface plasmon resonance modes locating on both sides of the peak that suppresses the transmission. Such structures can be applied in advanced photonic devices.

Sun Zhijun; Yang Ying; Zuo Xiaoliu [Department of Physics, Xiamen University, Xiamen 361005 (China)

2012-10-22T23:59:59.000Z

204

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

205

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

206

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

207

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-09-28T23:59:59.000Z

208

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Pivrinta, Lassi

2010-01-01T23:59:59.000Z

209

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

210

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

211

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

212

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

213

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

214

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

215

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECCs RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a plan that consists of a package containing a small number of contingent plans that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

216

Four regional transmission organizations set new or nearly broke ...  

U.S. Energy Information Administration (EIA)

CORRECTION: ISO-NE did not set a new all-time system demand record on July 22, 2011, as previously reported in Today in Energy on July 25, 2011.

217

Allegheny Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

Utility Id 332 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

218

Village of Plymouth, Ohio (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Utility Id 15203 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form...

219

City of Vineland, New Jersey (Utility Company) | Open Energy...  

Open Energy Info (EERE)

Utility Id 19856 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes...

220

Atmospheric pressure scanning transmission electron microscopy  

SciTech Connect

Scanning transmission electron microscope (STEM) images of gold nanoparticles (2.1 nm average diameter) at atmospheric pressure have been recorded through a 0.36 mm thick mixture of CO, O2 and He. This was accomplished using a reaction cell consisting of two electron-transparent silicon nitride membranes mounted on a specially designed specimen rod. Gas flow occurred through plastic tubing from the outside of the microscope to the specimen region and back. Gold nanoparticles of a full width half maximum diameter of 1.0 nm were visible above the background noise and the achieved resolution was 0.5 nm in accordance with calculations of the beam broadening.

De Jonge, Niels [ORNL; Veith, Gabriel M [ORNL; Bigelow, Wilbur C [ORNL

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Workshop title: Transmission and Utility Scale Solar Opportunities "South of Phoenix" (or should we say "in Arizona" if we inc  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose: A stakeholder communication with transmission customers, Tribes, developers, state Purpose: A stakeholder communication with transmission customers, Tribes, developers, state and federal agencies, and utilities about Western Area Power Administration's (Western) Rocky Mountain Region (RMR) and its Transmission Planning and Business Unit. The workshop will provide an overview of Western RMR's transmission planning and services and provide an opportunity for open discussion on overcoming transmission challenges in the region. The workshop will also meet the local transmission planning process requirements for FERC Order 890 as outlined in Western's Open Access Transmission Tariff.

222

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

223

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

224

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

225

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

226

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

227

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

228

Energy Landscapes: Coal Canals, Oil Pipelines, Electricity Transmission Wires in the Mid-Atlantic, 1820-1930.  

E-Print Network (OSTI)

??Coal canals, oil pipelines, and electricity transmission wires transformed the built environment of the American mid-Atlantic region between 1820 and 1930. By transporting coal, oil, (more)

Jones, Christopher F.

2009-01-01T23:59:59.000Z

229

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

230

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

231

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

232

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

233

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations 2009 National Electric Transmission Congestion Study - San Francisco

234

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice: Plan for Conduct of 2012 Electric Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study November 10, 2011 - 1:42pm Addthis The Department has issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. Addthis Related Articles 2012 Congestion Study Workshops to be Held in December; Agendas Now

235

Assumptions to the Annual Energy Outlook 2001 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market

236

2012 National Electric Transmission Congestion Study | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 2012 National Electric Transmission Congestion Study 2012 National Electric Transmission Congestion Study 2012 National Electric Transmission Congestion Study The Department issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. DOE appreciates the comments that various individuals and organizations submitted. The Department is preparing the 2012 Congestion Study now, and hosted three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. The presentation used in the webinars is now available. Later this year, DOE will release a draft of the study

237

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

238

Assumptions to the Annual Energy Outlook 2002 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market

239

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

240

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Scanning/Transmission Electron Microscopes  

NLE Websites -- All DOE Office Websites (Extended Search)

ScanningTransmission Electron Microscopes Nion UltraSTEM 60-100 dedicated aberration-corrected STEM for low- to mid-voltage operation and Enfina EELS Contact: Juan-Carlos Idrobo,...

242

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

243

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

244

Transmission Structure Foundation Design Guide  

Science Conference Proceedings (OSTI)

This guide contains the most current and comprehensive information for the design of foundations for overhead line structures. The guide covers the complete transmission structure foundation design process from the subsurface investigations and design of the foundations, to the construction and inspection of the foundation. Reference documents to assist transmission structure foundation designers in the development of specifications such as for subsurface investigations and foundation construction ...

2012-11-28T23:59:59.000Z

245

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

246

Electric power transmission for a Hanford Nuclear Energy Center (HNEC)  

SciTech Connect

The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions.

Harty, H.; Dowis, W.J.

1983-06-01T23:59:59.000Z

247

Propagation and Transmission of Alfven Waves in Rotating Magnetars  

E-Print Network (OSTI)

We study the propagation and transmission of Alfven waves in the context of cylindrical geometry. This approximates the polar cap region of aligned pulsar with strong magnetic fields. Non-propagating region appears in the presence of rotation. The displacement current further prevents the low frequency modes from propagating near the stellar surface. The transmission rates to the exterior through the surface are calculated. The rates increase with the frequency and the magnetic field strength. The transmission also depends on the helicity states of the waves, but the difference becomes small in the high frequency regime. We also point out the possibility of the spin-up by outgoing wave emission in the low frequency regime, if a certain condition holds.

Yasufumi Kojima; Taishi Okita

2004-06-25T23:59:59.000Z

248

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting, Energy Policy,Dual variable on transmission line ks power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

249

Ultra-Long-Haul WDM transmission systems  

Science Conference Proceedings (OSTI)

This paper discusses the key transmission issues and design considerations for ultra-long-haul WDM systems. The key enabling technologies for the current generation of ultra-long-haul WDM transmission are described. Noise analysis and transmission modelling ...

Y. R. Zhou; A. Lord; S. R. Sikora

2002-10-01T23:59:59.000Z

250

EIA-Assumptions to the Annual Energy Outlook - National Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module Assumptions to the Annual Energy Outlook 2007 National Gas Transmission and Distribution Module Figure 8. Natural Gas Transmission and Distribution Model Regions. Need help, contact the National Energy Information Center at 202-586-8800. The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution

251

The Impact of Transmission Pricing in Network Industries  

E-Print Network (OSTI)

. As transmission constraints 1For a description of the regional electricity markets in the U.S. compare, e.g., http://www.ferc.gov/. 2Compare, e.g., Ofgem (2010) and Redpoint Energy (2011) for the British discussion, Frontier (2011) for the discussion in Germany...

Ruderer, Dominic

2012-06-07T23:59:59.000Z

252

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

253

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

254

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

255

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

256

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

257

Electric generating or transmission facility: determination of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination...

258

Definition: Deferred Transmission Capacity Investments | Open...  

Open Energy Info (EERE)

transformers.1 Related Terms transmission lines, transformer, transmission line, sustainability References SmartGrid.gov 'Description of Benefits' An inl LikeLike UnlikeLike...

259

EIS-0285: Transmission System Vegetation Management Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission System Vegetation Management Program June 23, 2000 EIS-0285: EPA Notice of Availability of the Final Environmental Impact Statement Transmission System Vegetation...

260

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Gallery < Transmission Jump to: navigation, search PhotoGalleryHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada...

262

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

American Transmission Systems Inc Place Ohio Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes References EIA...

263

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

Atlas < Transmission Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California...

264

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

265

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

266

Definition: Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Definition No reegle definition available. Also Known As Firm services Related Terms transmission lines, electricity generation, transmission line, smart grid References ...

267

Definition: Transmission Reliability | Open Energy Information  

Open Energy Info (EERE)

to ensure reliable system operation as system conditions change.1 Related Terms transmission lines, transfer capability, system, transmission line References Glossary...

268

Definition: Transmission Reliability Margin | Open Energy Information  

Open Energy Info (EERE)

system operation as system conditions change.1 Related Terms transfer capability, transmission lines, system, transmission line References Glossary of Terms Used in...

269

Definition: Transmission Constraint | Open Energy Information  

Open Energy Info (EERE)

that may be reached during normal or contingency system operations.1 Related Terms transmission lines, system, contingency, transmission line, element References ...

270

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

271

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

272

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

273

NDN, volume transmission, and self-organization in brain dynamics  

E-Print Network (OSTI)

NDN, VOLUME TRANSMISSION, AND SELF- ORGANIZATION IN BRAINThese systems instantiate volume transmission bynonsynaptic diffusion transmission, in concert with the

Freeman, Walter J III

2005-01-01T23:59:59.000Z

274

Definition: Non-Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

available. Also Known As Interruptible Load or Interruptible Demand Related Terms transmission lines, electricity generation, transmission line, firm transmission service,...

275

Does More international transmission capacity increase competition in the Belgian electricity market?  

SciTech Connect

From a national market perspective, taking transmission capacity into account reduces current concentration measures, although they remain fairly high even after substantial capacity increases. From an international perspective, a more efficient use of current transmission capacity by coupling regional markets can increase competition. That suggests it may not be appropriate to assess market concentration using national market shares. (author)

Kuepper, Gerd; Delarue, Erik; Delvaux, Bram; Meeus, Leonardo; Bekaert, David; Willems, Bert; Proost, Stef; D'haeseleer, William; Deketelaere, Kurt; Belmans, Ronnie

2009-01-15T23:59:59.000Z

276

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

277

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

278

The Development of HVDC Transmission System  

Science Conference Proceedings (OSTI)

The ever increasing process of high-voltage high-power fully controlled semiconductor technology has promoted the flexible ac transmission systems ahead significantly. Developments advance both the HVDC power transmission and the flexible ac transmission ... Keywords: converters station, HVDC transmission systems, power electronics

Yang Zhou; Dao Zhuojiang; Yu Fenwang

2012-07-01T23:59:59.000Z

279

Principles for interregional transmission expansion  

Science Conference Proceedings (OSTI)

In aiming to facilitate the siting of interregional transmission lines, some basic principles might include an approach where the Federal Energy Regulatory Commission uses a variety of tools to capture the value of new transmission, and thus increase the supply of interregional lines. There also may be opportunities for the Commission to work with localities to reduce resistance to new lines by means of economic incentives. Such a tack has the potential to be more efficient than fighting local opposition in the courts. (author)

Benjamin, Richard

2007-10-15T23:59:59.000Z

280

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Transmission characteristics of circular metallic waveguides for terahertz radiation  

SciTech Connect

Transmission characteristics of oversized circular metallic waveguides excited by linearly polarised Gaussian laser beams in the terahertz range (4 - 28 THz) are studied theoretically and experimentally. Calculating the transmission characteristics, we have determined the conditions of applicability of the method of the eigenoscillations in the approximations of a real metal by an ideal metal or dielectric, depending on the transmitted radiation frequency. The existence of the transition region is established in the behaviour of the electrodynamic properties of metallic waveguides in the frequency range of 7.5 - 15 THz.

Volodenko, A V; Gurin, O V; Degtyarev, A V; Maslov, Vyacheslav A; Svich, V A; Senyuta, V S; Topkov, A N [V.N. Karazin Kharkov National University, Kharkov (Ukraine)

2011-09-30T23:59:59.000Z

282

Energy Transmission by Barotropic Rossby Waves across Large-Scale Topography  

Science Conference Proceedings (OSTI)

An analytical study investigates the energy transmission by free, barotropic, linear Rossby waves across a large scale bottom topography when topographic and beta-effects have the same order of magnitude. In open ocean regions which are not ...

Bernard Barnier

1984-02-01T23:59:59.000Z

283

Investigation of Atmospheric Transmission in the Crimea (Ukraine) in the Twentieth Century  

Science Conference Proceedings (OSTI)

Systematic monitoring of spectral atmospheric transmission (SAT) has been conducted in the Crimea (a peninsula in Ukraine) since 1996. A sun-tracking solar photometer that records signals in five spectral regions selected by interference filters ...

E. I. Terez; G. A. Terez

2002-10-01T23:59:59.000Z

284

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

285

Transmission System SQRA Assessment Methods  

Science Conference Proceedings (OSTI)

Market conditions and increasingly stringent regulatory requirements have focused attention on metrics that quantify the Security, Quality, Reliability, and Availability (SQRA) of transmission systems. This report summarizes the state-of-the-art in performance metrics, provides four case studies of their use, and discusses future trends in reliability metrics, congestion metrics, and benchmarking.

2009-07-31T23:59:59.000Z

286

Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

The Underground Transmission Systems Reference Book covers all stages of cable system design and operation, from initial planning studies to failure analysis. It contains contributions from many of the industry's experts and represents practices from all parts of the United States.

1993-03-01T23:59:59.000Z

287

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

288

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (Participating TO) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Companys (PG&E) Docket No. ER01-66-000, (2) San Diego Gas and Electric Companys supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (TRBA) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

289

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

5, DOE/EIA-M062(2005) (Washington, DC, 2005). 5, DOE/EIA-M062(2005) (Washington, DC, 2005). Energy Information Administration/Assumptions to the Annual Energy Outlook 2006 101 Primary Flows Secondary Flows Pipeline Border Crossing Specific LNG Terminals Primary Flows Secondary Flows Pipeline Border Crossing Specific LNG Terminals Generic LNG Terminals Alaska Alaska MacKenzie W. Canada E. Canada Canada Offshore & LNG Pacific (9) Mountain (8) CA (12) AZ/NM (11) W. South Central (7) E. South Central (6) W. North Central (4) E. North Central (3) Mid Atlantic (2) New Engl. (1) S. Atlantic (5) FL (10) Bahamas Mexico Figure 8. Natural Gas Transmission and Distribution Model Regions Source: Energy Information Administration, Office of Integrated Analysis and Forecasting Report #:DOE/EIA-0554(2006) Release date: March 2006 Next release date: March 2007

290

2012 National Electric Transmission Congestion Study - St. Louis Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

St. Louis St. Louis Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop On December 8, 2011, DOE hosted a regional pre-study workshop in St. Louis, MO to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops 12-08-11 Congestion Workshop Agenda - St Louis (final).pdf Introduction by David Meyer, DOE Presentation by Kevin Gunn, MO PSC.pdf Presentation by Jerry Lein, ND PSC.pdf Presentation by Tom Sloan, KS Legislature.pdf Presentation by Maureen Borkowski, Ameren.pdf Presentation by Laureen L Ross McCalib, Great River Energy.pdf Presentation by Dale Osborn, MISO.pdf

291

2009 National Electric Transmission Congestion Study - Oklahoma City  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City, OK to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-18-08 Congestion Workshop Agenda - Oklahoma City, OK.pdf Transcript - 2009 National Electric Transmission Congestion Study Oklahoma City Workshop.pdf Independent Market Monitor Monthly Market Metrics Report, May 2008, submitted at 2009 Congestion Study Oklahoma City workshop.pdf Comments of the Missouri Public Service Missouri Commission, submitted at 2009 Congestion Study Oklahoma City workshop.pdf

292

2012 National Electric Transmission Congestion Study - Portland Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Portland Workshop 2012 National Electric Transmission Congestion Study - Portland Workshop On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Western Workshops.pdf 12-13-11 CONGESTION WORKSHOP AGENDA - PORTLAND (final).pdf Introduction by David Meyer, DOE .pdf Presentation by Steve Oxley, WY PSC.pdf Presentation by Rich Bayless, NTTG.pdf Presentation by Susan Henderson, Xcel Energy.pdf Presentation by Marv Landauer, ColumbiaGrid.pdf Presentation by Steve Metague, PGE.pdf Presentation by Bradley Nickell, WECC.pdf

293

Microsoft PowerPoint - Walsh.ppt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Historic Congestion in the Eastern Historic Congestion in the Eastern Interconnection Midwest ISO Overview and Comments Mike Walsh Senior Director UDS, EMS, Compliance and Training Spring 2009 Technical Workshop in Support of the DOE 2009 Congestion Study March 25, 2009 2 Who We Are * Independent, non-profit organization responsible for maintaining reliable transmission of power in 14 states and one Canadian province * First Regional Transmission Organization (RTO) approved by the Federal Energy Regulatory Commission (FERC) 3 1996 1999 Discussions begin to form Midwest ISO First Board of Directors elected 2002 FERC approval as an RTO Tariff Administration under Midwest ISO OATT 2005 Midwest Energy Markets Begin 2001 2006 Began Ancillary Services Market Initiative 2007 JOA with PJM Start-Up Reliability Coordination &

294

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

295

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

296

Leigh Tesfatsion Professor of Econ, Math, and Electrical & Computer Engineering  

E-Print Network (OSTI)

Transmission Grid #12;6 Core Features of FERC's Market Design · Market to be managed by an Independent System-settlement system: Concurrent operation of day-ahead (forward) & real-time (spot) markets · Transmission grid://www.ferc.gov/industries/electric/indus-act/rto/rto-map.asp #12;5 U.S. Wholesale Electric Power

Tesfatsion, Leigh

297

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

298

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

299

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

300

Midwest Transmission Workshop II Summary  

DOE Green Energy (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

302

High current pulse transmission cable  

DOE Patents (OSTI)

This invention is comprised of a transmission cable for carrying high current pulses in which an even numbered plurality of electrical conductors surrounds a central ground conductor. Each electrical conductor is connected so that it at any instant in time it will carry current of opposite polarity to the polarity carried by adjacent conductors. This arrangement cancels practically all of the external fields generated by current in the conductors.

Parsons, W.M.

1990-09-28T23:59:59.000Z

303

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

304

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

305

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

306

Optical Curtain Effect: Extraordinary Optical Transmission Enhanced by Antireflection  

E-Print Network (OSTI)

In this paper, we employ an antireflective coating which comprises of inverted pi shaped metallic grooves to manipulate the behaviour of a TM-polarized plane wave transmitted through a periodic nanoslit array. At normal incidence, such scheme can not only retain the optical curtain effect in the output region, but also generate the extraordinary transmission of light through the nanoslits with the total transmission efficiency as high as 90%. Besides, we show that the spatially invariant field distribution in the output region as well as the field distribution of resonant modes around the inverted pi shaped grooves can be reproduced immaculately when the system is excited by an array of point sources beneath the inverted pi shaped grooves. In further, we investigate the influence of center-groove and side-corners of the inverted pi shaped grooves on suppressing the reflection of light, respectively. Based on our work, it shows promising potential in applications of enhancing the extraction efficiency as well ...

Cui, Yanxia; Lin, Yinyue; Li, Guohui; Hao, Yuying; He, Sailing; Fang, Nicholas X

2012-01-01T23:59:59.000Z

307

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

308

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

309

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

310

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

311

Wireless power transmission for medical applications  

E-Print Network (OSTI)

We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

Payne, Joshua E.

312

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

313

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

314

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

low load levels there can be situations where the capacitive component of the transmission line causes voltage

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

315

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

316

Average transmission probability of a random stack  

E-Print Network (OSTI)

The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

Yin Lu; Christian Miniatura; Berthold-Georg Englert

2009-07-31T23:59:59.000Z

317

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

318

High Resolution Transmission Microscopy Characterization of an ...  

Science Conference Proceedings (OSTI)

High Resolution Transmission Microscopy Characterization of an Oxide ... Line Dislocation Dynamics Simulation of fundamental dislocation properties in...

319

Advantages of Integrating Precession Scanning Transmission ...  

Science Conference Proceedings (OSTI)

Presentation Title, Advantages of Integrating Precession Scanning Transmission Electron Microscopy in the Characterization of Metallic Materials. Author(s)...

320

Transmission Electron Microscopy Studies on Lithium Battery ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Energy Nanomaterials. Presentation Title, Transmission Electron Microscopy...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Estimating the Economic 'Trade' Value of Increased Transmission Capability  

Science Conference Proceedings (OSTI)

The authors offer a new method of estimating the potential gains achievable via transmission expansion in moving power from lower-priced to higher-priced regions. Rather than relying on simulation approaches, where electricity is dispatched based on specific assumptions regarding market-bidding behavior, plant generating costs, and plant availability, this technique instead relies on actual market data to estimate this source of economic value. (author)

Kleit, Andrew N.; Reitzes, James D.

2006-03-01T23:59:59.000Z

322

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

323

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

324

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

325

Microsoft Word - RTO-QA-Summary-Final.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

On Novem notice (FR (SPP), a re applies to administe period, w stakehold members kickoff we Lincoln, N Western r and email http://ww This docu response complete 1. I s R 2. I' d 9 mber 1, 2013, RN) with a rec egional transm o the transmis ered by Weste hich ended D ders, and the hip in SPP. W ebinar held N NE, Sioux Falls received writt ls Western re ww.wapa.gov ment provide provided. So d with SPP. B support West egister notice Western a additional recommen were from support an negotiatio membersh recommen m a municipa oes Western The answe customer a of the deta Questio , Western Are commendatio mission organ ssion facilities ern's Upper G December 16, public at larg Western engag ovember 13, s, SD, and Farg ten comment eceived are po

326

RTO and Balancing AuthoritProposals for EIA Surveys  

U.S. Energy Information Administration (EIA)

... dynamics important to integration of renewable energy sources and development of smart grid technologies and demand response. ... Net Gen Demand Forecast ...

327

Subject: CAISO LCR Study Advisory Group Sue Mara RTO Advisors  

E-Print Network (OSTI)

Gary Tarplee SCE (final selection pending) Carolyn Winn SDG&E (final selection pending) Mike Jaske CEC (final selection pending) Tom Flynn CPUC (final selection pending) Tony Braun Northern CAISO Municipal (final selection pending) WECC Reliability Subcommittee Representative (final selection pending) Gary DeShazo- CAISO (LSAG Chair) To All: On behalf of the California ISO, I am pleased to welcome you as a member of the 2008 LCR Study Advisory Group ("LSAG"). Over the coming couple of months, we will collaborate on a review of the assumptions and criteria for this important study. I want to thank you in advance for your investment of time and thought. As you know, over the last 18 months, the CAISO has been working with stakeholders to determine the locational capacity requirements across the California ISO Controlled Grid in a manner that is consistent with the California Public Utility Commissions ("CPUC") implementation of Resource Adequacy. Earlier this year the CPUC adopted the CAISO's LCR results for 2007. At the same time, the CPUC indicated its desire for

Cc Doughty; Thomas Dukes; Ali Amirali; Ls Power; Chifong Thomas Pg

2006-01-01T23:59:59.000Z

328

Regional State Committees Can Help Provide a Regional Perspective to Planning and Siting Decisions, Reducing the Need for Federal Preemption  

SciTech Connect

The Energy Policy Act of 2005 gave FERC the authority to preempt state and local transmission siting authorities under certain conditions, creating the potential for federal/state disputes. Such disputes are less likely to occur where there are open, regional planning processes. Multi-state advisory bodies known as regional state committees, working with RTOs, can provide a forum to evaluate transmission needs from a regional perspective, reducing the need for FERC involvement. (author)

Basheda, Gregory

2006-03-01T23:59:59.000Z

329

Regional Residential  

Gasoline and Diesel Fuel Update (EIA)

upward pressure from crude oil markets, magnified by a regional shortfall of heating oil supplies, residential prices rose rapidly to peak February 7. The problem was...

330

Regional Maps  

Annual Energy Outlook 2012 (EIA)

United States Census Divisions Figure 2.Electricity Market Module (EMM)Regions Source: Energy Information Administration, Office of Integrated Analysis and Forecasting Figure...

331

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

332

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

333

Electronics and hydraulics control transmission  

SciTech Connect

Caterpillar engineers have combined electronics and hydraulics for improved transmission control and productivity. The control system had extensive field test experience during development. The system accumulated more than 100,000 hours on 17 vehicles, with individual vehicle times in the 2000-10,000-hour range. Job sites were chosen to test the system over a wide range of applications and locales. The EPTC components are CAT-designed and made by outside suppliers. The components must comply with CAT designs and specifications. All components are 100% functionally tested. The control box is computer-tested functionally at the supplier and at CAT before vehicle installation.

Morris, H.C.; Sorrells, G.K.

1986-04-01T23:59:59.000Z

334

The role of transmission investment in the coordination between generation and transmission  

E-Print Network (OSTI)

generation and transmission of electricity into distinct modules. The governance structure of transmission the governance of electricity transmission assets influences the implementation of power flow management. Finally to coordinate generation and transmission of electricity is in real organizations. 1 Assistant Professors

Paris-Sud XI, Université de

335

Application of EPRI's Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs  

Science Conference Proceedings (OSTI)

Public utilities in the United States are expected to provide transmission services and ancillary services to eligible customers. This report documents how Centerior Energy Corporation developed a network integration transmission service tariff, a point-to-point transmission service tariff, and four ancillary services tariffs by applying EPRI's Transmission Services Costing Framework.

1996-03-09T23:59:59.000Z

336

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

337

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

338

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

339

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

340

Transmission Electron Microscopy Study of InN Nanorods  

E-Print Network (OSTI)

Transmission Electron Microscopy Study of InN Nanorods Z.epitaxy and studied by transmission electron microscopy,establish their quality. Transmission electron microscopy (

Liliental-Weber, Z.; Li, X.; Kryliouk, Olga; Park, H.J.; Mangum, J.; Anderson, T.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

National Transmission Grid Study: 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Grid Study: 2002 National Transmission Grid Study: 2002 National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE)...

342

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

CaliforniaTransmissionLocal Regulations < California | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State...

343

Transmission Forum Agenda - February 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Forum Agenda - February 2012 Transmission Forum Agenda - February 2012 FINAL AGENDA - Transmission Forum Feb 2012 (Denver) 020212.pdf More Documents & Publications DOE...

344

PP-76 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 The Vermont Electric Transmission Company PP-76 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct,...

345

PP-76-1 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to...

346

EMISSION AND TRANSMISSION NOISE PROPAGATION IN POSITRON EMISSION COMPUTED TOMOGRAPHY  

E-Print Network (OSTI)

26-29, 1979 EMISSION AND TRANSMISSION NOISE PROPAGATION INLBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION INl. LBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION IN

Gullberg, G.T.

2010-01-01T23:59:59.000Z

347

Comments of New England Electric Transmission Corporation on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

348

Automated manual transmission mode selection controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

349

Automated manual transmission shift sequence controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

350

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

351

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

352

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

353

Open Access Transmission and Renewable Energy Technologies  

Science Conference Proceedings (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

354

Regional Purchasing  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional Purchasing Regional Purchasing Regional Purchasing Pursuant to Appendix M of Prime Contract No. DE-AC52-06NA25396 between DOE/NNSA and Los Alamos National Security, LLC (LANS), LANS is committed to building a strong supplier base with Northern New Mexico businesses and the local Native American pueblos in the purchases of goods and services. Contact Small Business Office (505) 667-4419 Email We seek out and utilize known Northern New Mexico business as suppliers The Northern New Mexico counties included are Los Alamos Santa Fe Rio Arriba Taos Mora San Miguel Sandoval The eight regional pueblos included are Nambe Ohkay Owingeh (formerly known as San Juan) Picuris Pojoaque San Ildefonso Santa Clara Taos Tesuque When the Laboratory cannot identify regional firms, it will expand its

355

Assumptions to the Annual Energy Outlook 2000 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, Model Documentation 2000, DOE/EIA-M062(2000), January 2000.

356

Assumptions to the Annual Energy Outlook 1999 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by obtaining market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation Report: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, DOE/EIA-MO62/1, January 1999.

357

MHK Technologies/Wave Energy Seawater Transmission WEST | Open Energy  

Open Energy Info (EERE)

Wave Energy Seawater Transmission WEST Wave Energy Seawater Transmission WEST < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage Wave Energy Seawater Transmission WEST.jpg Technology Profile Primary Organization Atmocean Inc Project(s) where this technology is utilized *MHK Projects/WEST Testing Technology Resource Click here Wave Technology Type Click here Point Absorber Technology Readiness Level Click here TRL 1-3: Discovery / Concept Definition / Early Stage Development & Design & Engineering Technology Description Atmocean WEST efficiently captures wave energy by deploying many inexpensive devices across large ocean regions. By using hydraulic transmission, WEST avoids the high cost of seafloor power lines, generating electricity onshore to achieve higher reliability at lower cost. When WEST is combined with Bright Energy Storage Technologies seafloor compressed air energy storage (CAES) system, the two enable base load renewable power (eliminating the need for backup fossil-fuel power) at a projected levelized cost of electricity (LCOE) of $.08/kWh to $.12/kWh.

358

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

359

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

360

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

1987-05-19T23:59:59.000Z

362

Regional Inventories  

Gasoline and Diesel Fuel Update (EIA)

5 5 Notes: This year has not started well for gasoline inventories, with inventories being low across regions of the country. The Midwest region (PADD II) had been running lower than most regions, but began to catch up during the last week in April. Gasoline inventories ran about 9% below their 5-year average for this time of year and about 4% below where they were last year. The recent refinery problems in the Midwest, though, could erase some of that recovery. The impacts of Tosco's Wood River refinery and Marathon's St Paul refinery are not fully realized. But inventories were also precariously low along the East Coast (PADD I) and are extremely low in the Rocky Mountain region (PADD IV), although the size of this market mitigates any national impact. While the

363

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

364

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

365

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

366

Renewable portfolio standards, Greenhouse gas reduction, and Long-Line transmission investments in the WECC  

Science Conference Proceedings (OSTI)

New, long-distance transmission lines to remote areas with concentrations of high-quality renewable resources can help western states meet the challenges of increasing renewable energy procurement and reducing greenhouse gas emissions more cost-effectively than reliance on local resources alone. The approach applied here to the Western Electricity Coordinating Council is useful for an initial determination of the net benefits of long-line transmission between regions with heterogeneous resource quality. (author)

Olson, Arne; Orans, Ren; Allen, Doug; Moore, Jack; Woo, C.K.

2009-11-15T23:59:59.000Z

367

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

368

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

369

Magnetic Materials for Broadband Transmission Line  

E-Print Network (OSTI)

The authors series of articles on broadband transmission line transformers (TLTs) concludes with these notes on magnetic materials and the properties that are important for best performance Ferrite and iron powder magnetic materials were developed to support a wide range of components, including inductors, EMI suppressors, conventional transformers and transmission line transformers (TLTs). This article deals with transmission line transformers, presenting the observations and conclusions of the author, reached after extensive experimental research into the behavior and performance of these devices in broadband applications. Figure 1 The three transformers used in comparing the performance of the autotransformer and the transmission line transformer. At the top left is an autotransformer; at the top right is the transmission line transformer, while at the bottom is a transmission line transformer without a ferrite core. All transformers had a total of 10 turns.

Jerry Sevick

2005-01-01T23:59:59.000Z

370

Transmission Electron Microscope and Scanning Electron Microscopes -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

371

Overhead Transmission Inspection and Assessment Guidelines -- 2011  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line compon...

2011-12-23T23:59:59.000Z

372

Transmission Cable Life Evaluation and Management  

Science Conference Proceedings (OSTI)

High-pressure fluid-filled (HPFF) transmission cable systems constitute nearly 80 percent of the transmission cables in the United States, and represent an estimated $18 billion investment, in present-day dollars. Many of these systems are reaching or have exceeded their design life of 40 years, and evaluating their condition and remaining life is of utmost importance to utilities seeking to make full use of their underground transmission assets. This report describes procedures and diagnostic tools for ...

1998-12-24T23:59:59.000Z

373

Overhead Transmission Inspection and Assessment Guidelines - 2012  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line ...

2012-12-20T23:59:59.000Z

374

FERC rate incentives for transmission infrastructure development  

Science Conference Proceedings (OSTI)

With enactment of the Energy Policy Act of 2005, Congress delivered a mandate to the Federal Energy Regulatory Commission to establish regulations that would provide for incentive-based rate treatments for investments that would improvement the nation's electric transmission system. That has required FERC to move from merely approving cost-based rates for transmission services to enacting new regulations that would make it more attractive to invest in transmission infrastructure without offending the ''just and reasonable'' rate standard. (author)

Snarr, Steven W.

2010-03-15T23:59:59.000Z

375

Transmission System: Loss Reduction and Utilization Enhancement  

Science Conference Proceedings (OSTI)

EPRI R&D program 172Efficient Transmission Systems for a Carbon-Constrained Worldcomprises base research activities and a series of demonstration projects under the collaborative efforts led by EPRI, the Federal Energy Regulatory Commission (FERC), and the transmission industry. The program's goal is to understand, through real-life examples, designs that can help build a more efficient transmission system. Base research and development activities under program P172 have set the foundation for the demons...

2011-12-13T23:59:59.000Z

376

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

377

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

378

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

379

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preparation of the 2012 National Electric Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION COMPANY OF NEW YORK. INC. AND ORANGE AND ROCKLAND UTILITIES, INC....

380

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

NREL: Transmission Grid Integration - Research Staff  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

382

Directional Reactive Power Ground Plane Transmission - Energy ...  

ORNL researchers have developed a pioneering power ... out-of-phase with respect to time. This phenomenon allows electrical transmission on a single ...

383

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

384

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

NLE Websites -- All DOE Office Websites (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

385

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

386

Atom Probe Tomography and Transmission Electron Microscopy ...  

Science Conference Proceedings (OSTI)

Abstract Scope, Atom probe tomography (APT) and analytical transmission .... of a Leaking Type 316 Socket Weld in a Boron Injection Tank Sampling Line.

387

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

a whollyowned subsidiary of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing...

388

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

LLC Place Juno Beach, Florida Zip 33408 Product Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC...

389

Transmission Expansion Planning Using an AC Model  

E-Print Network (OSTI)

Jan 2, 2013 ... Abstract: Transmission expansion planning (TEP) is a rather complicated process which requires extensive studies to determine when, where...

390

NREL: Transmission Grid Integration - Issues Affecting Renewable...  

NLE Websites -- All DOE Office Websites (Extended Search)

issues related to the integration of renewable energy sources into the transmission system. Developing solutions to these challenges will enable higher penetrations of...

391

Midwest Independent Transmission System Operator | Open Energy...  

Open Energy Info (EERE)

Name Midwest Independent Transmission System Operator Place Carmel, IN References SGIC1 No information has been entered for this organization. Add Organization This article is a...

392

Transmission eigenvalues for operators with constant coefficients  

E-Print Network (OSTI)

In this paper we study the interior transmission problem and transmission eigenvalues for multiplicative perturbations of linear partial differential operator of order $\\ge 2$ with constant real coefficients. Under suitable growth conditions on the symbol of the operator and the perturbation, we show the discreteness of the set of transmission eigenvalues and derive sufficient conditions on the existence of transmission eigenvalues. We apply these techniques to the case of the biharmonic operator and the Dirac system. In the hypoelliptic case we present a connection to scattering theory.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Pivrinta

2010-04-28T23:59:59.000Z

393

NREL: Transmission Grid Integration - Working With Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working With Us NREL works with industry, government, and academia on transmission integration research. Learn how you can work with us. Develop Technology Partnerships There are a...

394

American Transmission Company LLC | Open Energy Information  

Open Energy Info (EERE)

American Transmission Company LLC Place Waukesha, WI References SGIC1 No information has been entered for this organization. Add Organization This article is a stub. You can help...

395

NREL: Transmission Grid Integration - Solar Integration National...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Western Wind and Solar Integration Study and Eastern Wind Integration and Transmission Study datasets greatly advanced the modeling of wind and solar power production...

396

Available Technologies: Transmission Electron Microscope Phase ...  

Robert Glaeser and Jian Jin have developed an apparatus that can be integrated into transmission electron microscopes (TEMs) to enable high contrast imaging of weak ...

397

OFDM techniques for multimedia data transmission.  

E-Print Network (OSTI)

??Orthogonal Frequency Division Multiplexing (OFDM) is an efficient parallel data transmission scheme that has relatively recently become popular in both wired and wireless communication systems (more)

Neville, K

2011-01-01T23:59:59.000Z

398

Transmission planning in deregulated power markets.  

E-Print Network (OSTI)

??Transmission systems in deregulated power systems have largely been left to centralized network operators although various forms of participation by merchant operators have been proposed. (more)

Panambarage Anton Jagath Fonseka.

2008-01-01T23:59:59.000Z

399

The hidden value of transmission assets  

SciTech Connect

Numerous utilities have realized that they can do better with their transmission assets than neutering them into ISOs and have proposed the creation of for-profit transmission companies (Transcos). This would turn transmission assets into equity with higher risk but also returns potentially higher than the regulated cost of capital. This article's contribution to the ongoing debate is to show that Transcos constitute a simple and robust solution to transmission congestion problems that would otherwise jeopardize the advent of competitive power markets. Policymakers and regulators should therefore view favorably the emergence of for-profit, regulated transmission companies, and leave them with reasonable room to recover their cost and earn a fully compensatory return on investment. Regulatory benevolence is crucial for Transcos, for electric power transmission is arguably the ultimate regulated activity: significant economies of scale and wide-ranging network externalities (the infamous loop flows) make operation and management of the grid a natural monopoly that must be regulated. A significant share of the value at stake therefore hinges on the regulator's attitude towards the for-profit transmission company: if the regulator is favorable, she will leave enough room to recover the variable and capital costs. If she is unfavorable, the proposition is simply a non-starter. This article first builds a public policy argument in favor of transmission companies, then discusses the key success factors required to create significant value in transmission: regulatory prowess and superior network management.

Nasser, T.O. (McKinsey and Co., Washington, DC (United States))

1999-06-01T23:59:59.000Z

400

Helicopter Transmission Case Study - Programmaster.org  

Science Conference Proceedings (OSTI)

The transmission components showed damage that was consistent with continued operation without oil, which ... Failure Analysis of a Pressure Transmitter Line.

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Western proposes to rebuild and upgrade two, parallel, 4.8-mile-long transmission lines located between Gila and North Gila Substations and take land actions...

402

NREL: Transmission Grid Integration Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Photo of transmission lines with a city in the background. NREL works with electric utilities, energy policymakers, and other industry partners to integrate large-scale renewable...

403

TUTORIALS: Introduction to Conventional Transmission Electron ...  

Science Conference Proceedings (OSTI)

Jul 2, 2008 ... The link provided accesses the web site for the text, Introduction to Conventional Transmission Electron Microscopy by Marc DeGraef. The site...

404

Frontiers of In Situ Transmission Electron Microscopy  

Science Conference Proceedings (OSTI)

... significance and versatility of in situ transmission electron microscopy (TEM) has ... applied stimulus is observed as it happens inside the microscope. ...

2013-05-29T23:59:59.000Z

405

Coordination of Federal Authorizations for Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy...

406

Data Transmission Performance of Graphene Interconnects  

Science Conference Proceedings (OSTI)

We are continuously improving the quality of CVD grown graphene layers to improve the bandwidth of transmission beyond the gigabits per second level.

407

Automated Transmission Kikuchi Diffraction for Nanomaterials ...  

Science Conference Proceedings (OSTI)

Presentation Title, Automated Transmission Kikuchi Diffraction for Nanomaterials Characterization in the SEM. Author(s), Scott Sitzman. On-Site Speaker...

408

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

New England Outlook: Smart Grid is About Consumers, Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

409

Viability of a National HVDC Transmission Ring in India  

E-Print Network (OSTI)

The paper presents the current scenario in India as regards the EHV AC and DC transmission backbone systems. The ultimate goal of the transmission sector is to create an integrated national power system grid for the effective distribution of electrical energy throughout the country. This paper proposes HVDC as an attractive alternative for the transformation of the network from independent regional grids to a fully integrated national grid, and details how the existing, decided and planned HVDC systems could be utilised in such a scheme. A conceptual scheme and control strategy is presented to achieve an HVDC national ring-main. Advantages of such a scheme in terms of its reliability, controllability and immunity to different grid disturbances are enumerated. The paper also outlines the challenges involved in terms of algorithms required for control coordination among different HVDC links and load despatch centres for achieving such a system.

Mata Prasad; Rebati Dass; S. Chakravorty; Carl-gte Carlsson; Gran Isacsson; Asea Brown; Power System Engineering

1999-01-01T23:59:59.000Z

410

National Electric Transmission Congestion Study 2006 Eastern Interconnection Analysis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Memorandum To: Poonum Agrawal, David Meyer, U.S. Department of Energy CRA No. D08554-00 From: Prashant Murti, Alex Rudkevich, CRA International Date: Finalized March 13, 2006 Subject: GE MAPS INPUT ASSUMPTIONS: EASTERN INTERCONNECT This memorandum summarizes salient inputs to the CRA locational price forecasting model (GE MAPS). The model geographic footprint encompasses the US portion of the Eastern Interconnect and the Canadian province of Ontario. The analyses simulate the years 2008 and 2011. Primary data sources for the CRA GE MAPS model include the NERC MMWG, the General Electric generation and transmission databases for the Eastern Interconnect, various publications by NERC regions and Independent System Operators, FERC submissions by generation and transmission owners,

411

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Energy.gov (U.S. Department of Energy (DOE))

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

412

The integration of renewable energy sources into electric power transmission systems  

DOE Green Energy (OSTI)

Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

1995-07-01T23:59:59.000Z

413

Mutual Design Considerations for Overhead AC Transmission Lines and Gas Transmission Pipelines, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This reference book presents data on an investigation into the mutual effects of electric power transmission lines and natural gas transmission pipelines sharing rights-of-way. Information is useful to both power and pipeline industry users.

1978-09-01T23:59:59.000Z

414

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

415

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

416

Comments of New England Electric Transmission Corporation on Proposed Open  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

417

Hydromechanical transmission with hydrodynamic drive  

DOE Patents (OSTI)

This transmission has a first planetary gear assembly having first input means connected to an input shaft, first output means, and first reaction means, and a second planetary gear assembly having second input means connected to the first input means, second output means, and second reaction means connected directly to the first reaction means by a reaction shaft. First clutch means, when engaged, connect the first output means to an output shaft in a high driving range. A hydrodynamic drive is used; for example, a torque converter, which may or may not have a stationary case, has a pump connected to the second output means, a stator grounded by an overrunning clutch to the case, and a turbine connected to an output member, and may be used in a starting phase. Alternatively, a fluid coupling or other type of hydrodynamic drive may be used. Second clutch means, when engaged, for connecting the output member to the output shaft in a low driving range. A variable-displacement hydraulic unit is mechanically connected to the input shaft, and a fixed-displacement hydraulic unit is mechanically connected to the reaction shaft. The hydraulic units are hydraulically connected together so that when one operates as a pump the other acts as a motor, and vice versa. Both clutch means are connected to the output shaft through a forward-reverse shift arrangement. It is possible to lock out the torque converter after the starting phase is over.

Orshansky, Jr., deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1979-01-01T23:59:59.000Z

418

Low cost Image Transmission System  

SciTech Connect

Throughout the Department of Energy (DOE) complex, sites protect themselves with intrusion detection systems. Some of these systems have sensors in remote areas. These sensors frequently alarm -- not because they have detected a terrorist skulking around the area, but because they have detected a horse, or a dog, or a bush moving in the breeze. Even though the local security force is 99% sure there is no real threat, they must assess each of these nuisance or false alarms. Generally, the procedure consists of dispatching an inspector to drive to the area and make an assessment. This is expensive in terms of manpower and the assessment is not timely. Often, by the time the inspector arrives, the cause of the alarm has vanished. A television camera placed to view the area protected by the sensor could be used to help in this assessment, but this requires the installation of high-quality cable, optical fiber, or a microwave link. Further, to be of use at the present time, the site must have had the foresight to have installed these facilities in the past and have them ready for use now. What is needed is a device to place between the television camera and a modem connecting to a low-bandwidth channel such as radio or a telephone line. This paper discusses the development of such a device: an Image Transmission System, or ITS.

Skogmo, D.

1994-06-01T23:59:59.000Z

419

Leigh Tesfatsion Professor of Econ, Math, and Electrical and Comp. Engineering  

E-Print Network (OSTI)

SystemsThe Complexity of Power Systems #12;4 U.S. Wholesale Electric Power Transmission Grid #12;5 North (CAISO) #12;6 FERC Wholesale Power Market Design Adopters to Date http://www.ferc.gov/industries/electric/indus-act/rto/rto-map

Tesfatsion, Leigh

420

Transmission Investment: Nourishing a Gnarly Tree  

Science Conference Proceedings (OSTI)

The Federal Energy Regulatory Commission needs to create a proper framework for investors to weigh the economic viability of transmission projects, then step aside. That means allowing investors and utilities to enter into more varied business models, while maintaining the integrity of the stand-alone transmission business.

Renner, Stein B.

2005-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Pricing transmission rights using ant colony optimization  

Science Conference Proceedings (OSTI)

We propose a novel idea for pricing Transmission Rights (which are similar to financial options) using a nature inspired meta heuristic algorithm, Ant Colony Optimization (ACO). ACO has been used extensively in combinatorial optimization problems and ... Keywords: ant colony optimization, financial options, transmission rights

Sameer Kumar Singh; Ruppa K. Thulasiram; Parimala Thulasiraman

2011-07-01T23:59:59.000Z

422

Transmission line protection based on travelling waves  

Science Conference Proceedings (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

423

Information transmission through lossy bosonic memory channels  

E-Print Network (OSTI)

We study the information transmission through a quantum channel, defined over a continuous alphabet and losing its energy en route, in presence of correlated noise among different channel uses. We then show that entangled inputs improve the rate of transmission of such a channel.

Giovanna Ruggeri; Giulio Soliani; Vittorio Giovannetti; Stefano Mancini

2005-02-15T23:59:59.000Z

424

Spatial mode properties of plasmon assisted transmission  

E-Print Network (OSTI)

Orbital angular momentum of photons is explored to study the spatial mode properties of plasmon assisted transmission process. We found that photons carrying different orbital angular momentums have different transmission efficiencies, while the coherence between these spatial modes can be preserved.

Xi-Feng Ren; Guo-Ping Guo; Yun-Feng Huang; Zhi-Wei Wang; Guang-Can Guo

2006-03-03T23:59:59.000Z

425

Ecological benefits of dc power transmission  

Science Conference Proceedings (OSTI)

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

426

New Approaches to Managing Transmission Project Risk  

Science Conference Proceedings (OSTI)

This report discusses the growing risks associated with transmission development and the importance of managing or hedging these risks. It presents case studies to illustrate the risks and categorizes approaches to managing them. It describes two EPRI tools that may be useful in managing transmission development risks, suggests how these tools might be further developed, and identifies other useful areas of research.

2006-11-15T23:59:59.000Z

427

On financial transmission rights and market power  

Science Conference Proceedings (OSTI)

This paper studies financial transmission rights in electricity pool markets with nodal pricing, when these rights are to be allocated by an auction mechanism. A market distribution function approach is used to investigate the effects on electricity ... Keywords: Electricity markets, Financial transmission rights, Nodal pricing

Geoffrey Pritchard; Andy Philpott

2005-10-01T23:59:59.000Z

428

Hot electron transmission in metals using epitaxial NiSi{sub 2}/n-Si(111) interfaces  

SciTech Connect

We have investigated hot electron transmission across epitaxial metal-disilicide/n-Si(111) interfaces using ballistic electron emission microscopy (BEEM). Different crystal orientations of epitaxial NiSi{sub 2} were grown on a Si(111) substrate using molecular beam epitaxy. The presence of different interfaces of NiSi{sub 2} on Si(111) were confirmed by high resolution transmission electron microscopy. Electrical transport measurements reveal a clear rectifying Schottky interface with a barrier height of 0.69 eV. However, using BEEM, three different regions with different transmissions and Schottky barrier heights of 0.65 eV, 0.78 eV, and 0.71 eV are found. The addition of a thin Ni film on the NiSi{sub 2} layer strongly reduces the transmission in all the three regions and interestingly, almost equalizes the transmission across them.

Parui, S.; Wit, B.; Wees, B. J. van; Banerjee, T. [Physics of Nanodevices, Zernike Institute for Advanced Materials, University of Groningen (Netherlands); Bignardi, L.; Rudolf, P. [Surfaces and Thin Films, Zernike Institute for Advanced Materials, University of Groningen (Netherlands); Kooi, B. [Nanostructured Materials and Interfaces, Zernike Institute for Advanced Materials, University of Groningen (Netherlands)

2011-07-18T23:59:59.000Z

429

Coordination of Federal Authorizations for Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

430

Transmission Issues and Power Exchanges in Texas  

E-Print Network (OSTI)

The electric transmission system in Texas has evolved over the years to its present state, in order to provide reliable service and reduce the amount of reserve capacity any individual utility needs to maintain. Presently there is pressure on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult to build. This paper presents a historical background on the development of the transmission system and describes the problems of assessing the impact and properly pricing certain bulk power transactions. In addition, it briefly describes the Electro-Magnetic Fields problem and how it relates to new transmission line construction.

Hughes, H. L.

1992-04-01T23:59:59.000Z

431

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

432

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

433

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

434

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

435

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

436

Conductive Channel for Energy Transmission  

SciTech Connect

For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

2011-11-10T23:59:59.000Z

437

CRSP Transmission Sales Rate History  

NLE Websites -- All DOE Office Websites (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

438

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

439

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

440

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

442

Solar collector having a solid transmission medium  

DOE Patents (OSTI)

There is provided a radiant energy transmission device capable of operation in a concentrative mode in which energy incident on an entrance area is directed toward and concentrated on an exit area of smaller area than the entrance area. The device includes a solid radiant energy transmission medium having surfaces coincident with the entrance and exit areas and particularly contoured reflective side walls. The surface coinciding with the entrance area is coupled to a cover plate formed of a radiant energy transmissive material. An energy transducer is coupled to the surface of the medium coinciding with the exit area.

Schertz, William W. (Batavia, IL); Zwerdling, Solomon (Woodridge, IL)

1977-06-14T23:59:59.000Z

443

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

444

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

445

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

446

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

447

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

448

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

449

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

450

Polarization transmission at RHIC, numerical simulations  

SciTech Connect

Typical tracking simulations regarding the transmission of the polarization in the proton-proton collider RHIC are discussed. They participate in general studies aimed at understanding and improving polarization performances during polarized proton-proton runs.

Meot F.; Bai, M.; Liu, C.; Minty, M.; Ranjbar, V.

2012-05-20T23:59:59.000Z

451

Energy Transmission by Barotropic Rossby Waves Revisited  

Science Conference Proceedings (OSTI)

This article presents a semianalytic method to investigate the properties of energy transmission across bottom topography by barotropic Rossby waves. The method is first used to revisit the analytical estimates derived from wave-matching ...

R. P. Matano; E. D. Palma

2005-11-01T23:59:59.000Z

452

Scanning Transmission Electron Microscopy Investigations of Complex...  

NLE Websites -- All DOE Office Websites (Extended Search)

Scanning Transmission Electron Microscopy Investigations of Complex Oxides Monday, May 23, 2011 - 3:30pm SSRL Conference room 137-322 Professor Tom Vogt, NanoCenter & Department of...

453

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

454

Data transmission element for downhole drilling components  

DOE Patents (OSTI)

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

455

Natural Gas Transmission and Distribution Module  

Reports and Publications (EIA)

Documents the archived version of the Natural Gas Transmission and Distribution Model that was used to produce the natural gas forecasts used in support of the Annual Energy Outlook 2013.

Joe Benneche

2013-07-18T23:59:59.000Z

456

Transmission policy in the United States  

E-Print Network (OSTI)

This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

Joskow, Paul L.

2004-01-01T23:59:59.000Z

457

Technical Architecture for Transmission Operations and Protection  

Science Conference Proceedings (OSTI)

Transmission systems are a critical power transport backbone and are increasingly necessary for integration of new and more diverse power generation from a variety of sources. In some areas, customers are generating their own power through renewable sources and may have surpluses that get "pushed back" into the power grid. This situation will be further exacerbated with plug-in hybrid vehicles, large wind farms, photovoltaic arrays, and other sources as energy continues to dominate the economy. Transmiss...

2008-12-23T23:59:59.000Z

458

IntelliGrid Transmission Architecture Development  

Science Conference Proceedings (OSTI)

Objective Future transmission system operations require the development of a distributed computing infrastructure that can keep up with the demands of new applications as well as the technical pressures being placed on power systems. This project identifies issues related to the supporting communications and distributed computing infrastructures necessary to support the next generation of transmission monitoring, control, and operations. Although substantial work has been completed, more is needed to dev...

2008-03-31T23:59:59.000Z

459

Transmission Line Surge Arrester - White Paper  

Science Conference Proceedings (OSTI)

Electricity customers are continually demanding improved transmission system reliability and performance. In order to improve reliability, utilities must focus on mitigating the effects of lightning, which is often the most frequent cause of transmission outages and service interruptions. The widespread use of electronic equipment at home and at work makes the challenge of providing reliable electrical service greater today than ever before. Customers can be adversely affected by even momentary outages o...

2005-07-27T23:59:59.000Z

460

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Transmission amplitudes from Bethe ansatz equations  

E-Print Network (OSTI)

We consider the Heisenberg spin chain in the presence of integrable spin defects. Using the Bethe ansatz methodology, we extract the associated transmission amplitudes, that describe the interaction between the particle-like excitations displayed by the models and the spin impurity. In the attractive regime of the XXZ model, we also derive the breather's transmission amplitude. We compare our findings with earlier relevant results in the context of the sine-Gordon model.

Anastasia Doikou; Nikos Karaiskos

2012-12-02T23:59:59.000Z

462

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

463

Managing Transmission Line Steel Structures, Version 2  

Science Conference Proceedings (OSTI)

Utilities are under more pressure than ever to efficiently utilize existing overhead lines by optimizing their life and reliability. A key issue involves the question of how to efficiently inspect and maintain transmission systems. In light of aging transmission and distribution infrastructures, resources are needed to design and implement cost-effective assessment and maintenance programs. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance progr...

2004-12-02T23:59:59.000Z

464

Information Sharing Across Transmission and Distribution Operations  

Science Conference Proceedings (OSTI)

In the real-time operation of the grid, there is a natural dividing line between the bulk power, or transmission, system and the distribution system. The increasing deployment of distributed resourcesincluding distributed energy resources (distributed generation) and curtailable load (demand response)will require update of transmission and distribution system processes and applications that ensure reliable and efficient grid operation. Closer coordination of activities will be necessary as both systems a...

2010-12-22T23:59:59.000Z

465

X-ray transmissive debris shield  

DOE Patents (OSTI)

A composite window structure is described for transmitting x-ray radiation and for shielding radiation generated debris. In particular, separate layers of different x-ray transmissive materials are laminated together to form a high strength, x-ray transmissive debris shield which is particularly suited for use in high energy fluences. In one embodiment, the composite window comprises alternating layers of beryllium and a thermoset polymer.

Spielman, Rick B. (Albuquerque, NM)

1994-01-01T23:59:59.000Z

466

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity  

E-Print Network (OSTI)

Gap junction-mediated electrical transmission: Regulatory mechanisms and plasticity Alberto E of synaptic transmission: chemical and electrical. While most efforts have been dedicated to the understanding of synaptic transmission: chemical and electrical. In chemical synapses, presynaptic electrical currents

Rash, John E.

467

Modeling Interregional Transmission Congestion in the National Energy Modeling System  

E-Print Network (OSTI)

the Reference Case Overall Transmission Lines Usage in 2025a load center via a DC transmission line such that flows onand interregional transmission lines are built which make up

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-01-01T23:59:59.000Z

468

PMD-Induced Transmission Penalties in  

E-Print Network (OSTI)

In this paper, we investigate for the first time chromatic dispersion and nonlinearity tolerances in the presence of polarization-mode dispersion (PMD) for polarization-multiplexed (POLMUX) 2 10-Gb/s nonreturn-to-zero (NRZ) transmission. In polarization-multiplexing, the interaction between fiber nonlinearity and PMD can lower the nonlinear tolerance beyond the tolerances evident when considering both transmission penalties separately; the combined penalties are significantly worse than in the case for non-POLMUX transmission. In this paper, we show, through simulations comparing POLMUX with non-POMUX transmission in the presence of nonlinearity, a reduction of about a factor of three in PMD tolerance. In addition, we show that the dispersion tolerance of POLMUX transmission is severely limited in the presence of PMD. For example, a 40-ps differential group delay (DGD) with worst case coupling of the polarization channels into the fiber lowers the dispersion tolerance, resulting in a 1-dB eye-opening penalty (EOP), from 1200 to 450 ps/nm. We conclude that the interaction between PMD, chromatic dispersion, and nonlinearity leads to the worst signal impairments in POLMUX transmission and increases the effort of using polarization-multiplexing as a modulation format.

Polarization-Multiplexed Transmission Van; D. Van Den Borne; Student Member; N. E. Hecker-denschlag; G. D. Khoe; H. De Waardt

2005-01-01T23:59:59.000Z

469

U-pattern hydrostatic transmission control linkage  

Science Conference Proceedings (OSTI)

This patent describes a vehicle having a hydrostatic transmission responsive to a transmission control lever to effect the speed and direction of the vehicle. The hydrostatic transmission has operative modes in forward, neutral and reverse, a console and a transmission control linkage mounted within the console and in communication with the transmission control lever, the transmission control linkage comprising: the console having a generally U-shaped slot formed therein including first and second spaced apart and generally parallel legs and a third leg intersecting the first and second legs; a shaft mounted in the console; a first control plate pivotally mounted on the shaft and having formed thereon a radially outward extending tab containing a slot and a radially outward extending nipple located generally at a right angle to the tab; a second control plate pivotally mounted on the shaft in axially spaced apart relationship to the first control plate and having formed thereon a radially outward extending tab containing a slot. A radially outward extending nipple is located generally at a right angle to the tab and opposite to the nipple of the first control plate; and a shift lever extending through the slot and having a tab form at one end.

King, M.J.

1986-12-02T23:59:59.000Z

470

CAPITAL REGION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

t 09/20/07 15:28 FAX 301 903 4656 t 09/20/07 15:28 FAX 301 903 4656 CAPITAL REGION 0 j002 SDOE F 1325.8 (8-89) EFG (0790) Energy United States Government Department of Energy Memorandum DATE. September 18, 2007 Audit Report No.: OAS-L-07-23 REPLY TO: IG-34 (A07TG036) SUBJECT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program-2007" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results o Four evaluation of the Federal Energy Regulatory Commission's (Commission) cyber security program. The evaluation was initiated in May 2007, and our fieldwork was conducted through September 2007. Our methodology is described in the attachment to this report. . INTRODUCTION AND OBJECTIVE The Commission reports that it is constantly improving thl stability, reliability, and

471

Power upgrading of transmission line by combining AC-DC transmission  

Science Conference Proceedings (OSTI)

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal ... Keywords: extra high voltage (EHV)transmission, flexible ac transmission system (FACTS), power system computer-aided design(PSCAD), simultaneous ac-dc power transmission

Jarupula Somlal

2010-07-01T23:59:59.000Z

472

Interdependencies of Electricity Markets with Gas Markets A Case Study of Transmission System Operators  

E-Print Network (OSTI)

amount of LNG imported will depend crucially on the development of the natural gas reserves in the region distribution companies, transmission companies, liquefied natural gas importers, and associate member companies and the Natural Gas markets and the conditions and influences on both markets. Load-growth influences the need

Rudnick, Hugh

473

2009 Electric Transmission Congestion Study | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

474

Transmission Planning: Institutional Issues in the West | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Institutional Issues in the West Transmission Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group by the...

475

Steady state modelling and analysis of flexible AC transmission systems.  

E-Print Network (OSTI)

??As electric utilities move into more competitive generation supply regimes, with limited scope to expand transmission facilities, the optimisation of existing transmission corridors for power (more)

Fuerte Esquivel, Claudio Rubn

1997-01-01T23:59:59.000Z

476

DOE Issues Two Draft National Interest Electric Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations U.S....

477

National Electric Transmission Congestion Study 2006 Area Maps  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission National Electric Transmission Congestion Study Congestion Study Congestion Area Maps Congestion Area Maps U.S. Department of Energy U.S. Department of Energy...

478

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

479

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

480

North Dakota Energy Conversion and Transmission Facility Siting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) North Dakota Energy Conversion and Transmission Facility Siting Act (North Dakota) < Back Eligibility...

Note: This page contains sample records for the topic "rto regional transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Draft Chapter 4: Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A robust interstate electric transmission network must be developed to enable our electricity future. Draft Chapter 4: Transmission Adequacy More Documents & Publications...

482

Electricity Transmission Congestion Costs: A Review of Recent...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Transmission Congestion Costs: A Review of Recent Reports Electricity Transmission Congestion Costs: A Review of Recent Reports This study reviews reports of congestion...

483

2006 National Electric Transmission Congestion Study and Related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion Electric Transmission Study, required by section...

484

EIA - Natural Gas Pipeline Network - Natural Gas Transmission...  

Annual Energy Outlook 2012 (EIA)

Transmission Path Diagram About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 20072008 with selected updates Natural Gas Transmission Path Natural...

485

Integrating Renewable Energy into the Transmission and Distribution...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Integrating Renewable Energy into the Transmission and Distribution System of...

486

Definition: Open Access Transmission Tariff | Open Energy Information  

Open Energy Info (EERE)

navigation, search Dictionary.png Open Access Transmission Tariff Electronic transmission tariff accepted by the U.S. Federal Energy Regulatory Commission requiring the...

487

2012 Transmission and Energy Storage Peer Review Presentations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission and Energy Storage Peer Review Presentations Available 2012 Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis...

488

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

489

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

490

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

491

EA-1960: Townsite Solar Project Transmission Line, Clark County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management,...

492

PP-22-4 British Columbia Transmission Corporation  

Energy.gov (U.S. Department of Energy (DOE))

Presidential permit authorizing British Columbia Transmission Corporation to construct, operate, and mantain electric transmission facilities at the U.S-Canadian border.

493

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search REDIRECT...

494

Green Island Power Authority Transmission Voltage Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Island Power Authority Transmission Voltage Support System Project Green Island Power Authority Transmission Voltage Support System Project Power point presentation...

495

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

496

EA-1896: Williston to Stateline Transmission Line Project, Mountrail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project,...

497

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

498

Transmission and Energy Storage Peer Review Presentations Available...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission and Energy Storage Peer Review Presentations Available Transmission and Energy Storage Peer Review Presentations Available December 3, 2012 - 1:26pm Addthis...

499

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal...

500

Electric Power Transmission and Distribution (EPTD) Smart Grid...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) Electric Power Transmission and Distribution (EPTD) Smart Grid Program (New York) < Back...